Powered by Deep Web Technologies
Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Microsoft Word - scr-log  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Control Log Page : Log Date: System Name: Approval Status SCR Reqmnt Date Submitted Priority (E,U,R) * Change Approved Change Not Approved Hold (Future...

2

SCR body May 16  

NLE Websites -- All DOE Office Websites (Extended Search)

3 May 2005 3 May 2005 Selective Catalytic Reduction (SCR) Technology for the Control of Nitrogen Oxide Emissions from Coal-Fired Boilers An Update of Topical Report Number 9 TOPICAL REPORT NUMBER 23 May 2005 An Update of Topical Report Number 9 Selective Catalytic Reduction (SCR) Technology for the Control of Nitrogen Oxide Emissions from Coal-Fired Boilers Photos on pages 1, 3, 9, 11, and 16 courtesy of Riley Power Inc.,

3

Regenerated Plate Type SCR Catalyst Performance  

Science Conference Proceedings (OSTI)

Selective Catalytic Reduction (SCR) technology has become the technology of choice for meeting stringent nitrogen oxides (NOX) emission limits for many coal fired electric generating plants. With the aging of the domestic SCR fleet, the average age of catalysts currently in use has increased; and many facilities are now considering replacement or regeneration of the catalyst materials. Facilities planning to integrate SCR catalyst regeneration into their operations need to understand the overall performa...

2009-01-26T23:59:59.000Z

4

UREA INFRASTRUCTURE FOR UREA SCR NOX REDUCTION  

DOE Green Energy (OSTI)

Urea SCR is currently the only proven NOX aftertreatment for diesel engines - high NOX reduction possible - some SCR catalyst systems are robust against fuel sulfur - durability has been demonstrated - many systems in the field - long history in other markets - Major limitations to acceptance - distribution of urea solution to end user - ensuring that urea solution is added to vehicle.

Bunting, Bruce G.

2000-08-20T23:59:59.000Z

5

SCR Tech LLC | Open Energy Information  

Open Energy Info (EERE)

SCR Tech LLC SCR Tech LLC Jump to: navigation, search Name SCR-Tech LLC Place Charlotte, North Carolina Zip 28214 Sector Services Product US-based provider of catalyst regeneration technologies and management services for SCR systems. Coordinates 35.2225°, -80.837539° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.2225,"lon":-80.837539,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

6

SCR_1_pps v2.p65  

NLE Websites -- All DOE Office Websites (Extended Search)

coals because of the potential for high SO 3 levels, both from SO 3 formation in the boiler and oxidation of SO 2 in the SCR reactor. NO x reduction is controlled for the most...

7

SCR Catalyst Management for Mercury Control  

Science Conference Proceedings (OSTI)

A number of EPRI projects conducted over the past several years have examined the effects of SCR catalyst on mercury speciation. These projects have focused on the various factors influencing mercury oxidation, related to both the flue gas conditions and the catalysts themselves. However, the majority of these studies have only examined the speciation at the SCR inlet and outlet. Much less is known about the interlayer speciation, however, which is very important when developing catalyst management ...

2012-11-16T23:59:59.000Z

8

Mercury Oxidation Performance of Advanced SCR Catalyst  

Science Conference Proceedings (OSTI)

The ability of selective catalytic reduction (SCR) catalysts to oxidize mercury is an important aspect of many utilities mercury control strategies. Improved SCR mercury oxidation will facilitate its capture in downstream wetflue gas desulfurization systems and will generally result in lower emission rates. Recently, catalyst manufacturers have attempted to maximize mercury oxidation through advanced catalyst formulations.This study documents the performance of an advanced ...

2012-12-31T23:59:59.000Z

9

NETL: 2001 Conference on Selective Catalytic Reduction (SCR)...  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Experience with SCR on a 600-MW PRB-Fired Boiler PDF-8KB Dave Harris, Black & Veatch & Scot Pritchard, Cormetech Bench- and Pilot-Scale Evaluation of SCR and Other...

10

Hydrocarbon Fouling of SCR during PCCI combustion  

SciTech Connect

The combination of advanced combustion with advanced selective catalytic reduction (SCR) catalyst formulations was studied in the work presented here to determine the impact of the unique hydrocarbon (HC) emissions from premixed charge compression ignition (PCCI) combustion on SCR performance. Catalyst core samples cut from full size commercial Fe- and Cu-zeolite SCR catalysts were exposed to a slipstream of raw engine exhaust from a 1.9-liter 4-cylinder diesel engine operating in conventional and PCCI combustion modes. The zeolites which form the basis of these catalysts are different with the Cu-based catalyst made on a chabazite zeolite which las smaller pore structures relative to the Fe-based catalyst. Subsequent to exposure, bench flow reactor characterization of performance and hydrocarbon release and oxidation enabled evaluation of overall impacts from the engine exhaust. The Fe-zeolite NOX conversion efficiency was significantly degraded, especially at low temperatures (<250 C), after the catalyst was exposed to the raw engine exhaust. The degradation of the Fe-zeolite performance was similar for both combustion modes. The Cu-zeolite showed better tolerance to HC fouling at low temperatures compared to the Fe-zeolite but PCCI exhaust had a more significant impact than the exhaust from conventional combustion on the NOX conversion efficiency. Furthermore, chemical analysis of the hydrocarbons trapped on the SCR cores was conducted to better determine chemistry specific effects.

Prikhodko, Vitaly Y [ORNL; Pihl, Josh A [ORNL; Lewis Sr, Samuel Arthur [ORNL; Parks, II, James E [ORNL

2012-01-01T23:59:59.000Z

11

Mercury Oxidation Behavior of New, Aged, and Regenerated SCR Catalysts  

Science Conference Proceedings (OSTI)

Over 110,000 MW of coal-fired capacity in the United States has deployed selective catalytic reduction (SCR) for nitrogen oxide (NOx) control, and an additional estimated 60,000 MW may be installed by 2020. End users and operators of SCR systems have an ongoing need for the latest guidelines, methods, and other tools to ensure that existing and additional SCR equipment functions optimally without disrupting other unit operations. It is now widely known that along with NOx reduction, SCR catalysts have th...

2007-12-20T23:59:59.000Z

12

Mercury Oxidation and Capture over SCR Catalysts in Simulated ...  

Science Conference Proceedings (OSTI)

The SCR catalysts were tested for oxidation and capture of elemental mercury ... EBSD Analysis of Complex Microstructures of CSP? Processed Low Carbon...

13

Method and system for SCR optimization  

DOE Patents (OSTI)

Methods and systems are provided for controlling SCR performance in a boiler. The boiler includes one or more generally cross sectional areas. Each cross sectional area can be characterized by one or more profiles of one or more conditions affecting SCR performance and be associated with one or more adjustable desired profiles of the one or more conditions during the operation of the boiler. The performance of the boiler can be characterized by boiler performance parameters. A system in accordance with one or more embodiments of the invention can include a controller input for receiving a performance goal for the boiler corresponding to at least one of the boiler performance parameters and for receiving data values corresponding to boiler control variables and to the boiler performance parameters. The boiler control variables include one or more current profiles of the one or more conditions. The system also includes a system model that relates one or more profiles of the one or more conditions in the boiler to the boiler performance parameters. The system also includes an indirect controller that determines one or more desired profiles of the one or more conditions to satisfy the performance goal for the boiler. The indirect controller uses the system model, the received data values and the received performance goal to determine the one or more desired profiles of the one or more conditions. The system model also includes a controller output that outputs the one or more desired profiles of the one or more conditions.

Lefebvre, Wesley Curt (Boston, MA); Kohn, Daniel W. (Cambridge, MA)

2009-03-10T23:59:59.000Z

14

Predictable SCR co-benefits for mercury control  

Science Conference Proceedings (OSTI)

A test program, performed in cooperation with Dominion Power and the Babcock and Wilcox Co., was executed at Dominion Power's Mount Storm power plant in Grant County, W. Va. The program was focused on both the selective catalytic reduction (SCR) catalyst capability to oxide mercury as well as the scrubber's capability to capture and retain the oxidized mercury. This article focuses on the SCR catalyst performance aspects. The Mount Storm site consists of three units totaling approximately 1,660 MW. All units are equipped with SCR systems for NOx control. A full-scale test to evaluate the effect of the SCR was performed on Unit 2, a 550 MWT-fired boiler firing a medium sulfur bituminous coal. This test program demonstrated that the presence of an SCR catalyst can significantly affect the mercury speciation profile. Observation showed that in the absence of an SCR catalyst, the extent of oxidation of element a mercury at the inlet of the flue gas desulfurization system was about 64%. The presence of a Cornertech SCR catalyst improved this oxidation to levels greater than 95% almost all of which was captured by the downstream wet FGD system. Cornertech's proprietary SCR Hg oxidation model was used to accurately predict the field results. 1 ref., 2 figs., 1 tab.

Pritchard, S. [Cormtech Inc. (USA)

2009-01-15T23:59:59.000Z

15

Advanced NOx Emissions Control: Control Technology - SCR Catalyst Blinding  

NLE Websites -- All DOE Office Websites (Extended Search)

SCR Catalyst Blinding SCR Catalyst Blinding University of North Dakota Energy and Environmental Research Center (UND-EERC) is determining the potential of low-rank coal ash to cause blinding or masking of selective catalytic reduction (SCR) catalysts. A secondary goal will be to determine the degree of elemental mercury conversion across the catalysts. Specific objectives include (1) identify candidate coals and blends for testing under bench-scale conditions, (2) conduct bench-scale testing to screen coals and identify key conditions for full-scale testing, (3) design and construct an SCR slipstream test chamber for sampling at full-scale facilities, (4) conduct testing at full-scale testing, (5) identify SCR blinding mechanisms, rates, and cleaning methods as well as mercury conversion efficiencies, and (6) interpret data, prepare a report, and attend sponsor meetings to present information and recommendations.

16

TRIAC/SCR proportional control circuit  

DOE Patents (OSTI)

A power controller device which uses a voltage-to-frequency converter in conjunction with a zero crossing detector to linearly and proportionally control AC power being supplied to a load. The output of the voltage-to frequency converter controls the "reset" input of a R-S flip flop, while an "0" crossing detector controls the "set" input. The output of the flip flop triggers a monostable multivibrator controlling the SCR or TRIAC firing circuit connected to the load. Logic gates prevent the direct triggering of the multivibrator in the rare instance where the "reset" and "set" inputs of the flip flop are in coincidence. The control circuit can be supplemented with a control loop, providing compensation for line voltage variations.

Hughes, Wallace J. (Boston Lake, NY)

1999-01-01T23:59:59.000Z

17

TRIAC/SCR proportional control circuit  

DOE Patents (OSTI)

A power controller device is disclosed which uses a voltage-to-frequency converter in conjunction with a zero crossing detector to linearly and proportionally control AC power being supplied to a load. The output of the voltage-to frequency converter controls the ``reset`` input of a R-S flip flop, while an ``0`` crossing detector controls the ``set`` input. The output of the flip flop triggers a monostable multivibrator controlling the SCR or TRIAC firing circuit connected to the load. Logic gates prevent the direct triggering of the multivibrator in the rare instance where the ``reset`` and ``set`` inputs of the flip flop are in coincidence. The control circuit can be supplemented with a control loop, providing compensation for line voltage variations. 9 figs.

Hughes, W.J.

1999-04-06T23:59:59.000Z

18

TRIAC/SCR proportional control circuit  

DOE Patents (OSTI)

A power controller device which uses a voltage-to-frequency converter in conjunction with a zero crossing detector to linearly and proportionally control AC power being supplied to a load. The output of the voltage to frequency converter controls the reset input of a R-S flip flop, while an 0 crossing detector controls the set input. The output of the flip flop triggers a monostable multivibrator controlling the SCR or TRIAC firing circuit connected to the load. Logic gates prevent the direct triggering of the multivibrator in the rare instance where the reset and set inputs of the flip flop are in coincidence. The control circuit can be supplemented with a control loop, providing compensation for line voltage variations.

Hughes, Wallace J.

1997-12-01T23:59:59.000Z

19

Protocol for Laboratory Testing of SCR Catalyst: 2nd Edition  

Science Conference Proceedings (OSTI)

With the widespread deployment of selective catalytic NOx reduction (SCR) throughout the U.S. fleet of coal fired utility boilers, there was a need to establish standardized protocols to test catalyst. In 2006, EPRI issued a protocol that provided a uniform basis for testing SCR catalyst. In 2007, a wide range of industry representatives, including members of the Post-Combustion NOx Control Program, catalyst vendors, an independent catalyst testing laboratory, a catalyst reconditioner, and a provider of ...

2007-12-21T23:59:59.000Z

20

SCR Performance Improvement with Advanced In Situ Process Measurements  

Science Conference Proceedings (OSTI)

More stringent emission mandates have required that NOx levels be reduced from a broad range of coal-fired boilers. In response, selective catalytic reduction (SCR) systems have been deployed on numerous newer and larger capacity boilers. Although these SCR systems have provided large overall NOx reductions, recent changes in boiler load profiles have resulted from a combination of reduced economic activity as a result of the recession and increased renewable generation mandates in many states. Increased...

2012-05-14T23:59:59.000Z

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Pilot-Scale Evaluation of Mercury Oxidation Across SCR Catalysts  

Science Conference Proceedings (OSTI)

Measurements were conducted to evaluate the mercury chemical reactions using a pilot-scale SCR operating on flue gas slipstream from an eastern bituminous (~1.75% sulfur, ~750 ppm Cl) coal-fired power plant. Tests were conducted by the Western Kentucky University (WKU) to evaluate the impact of flue gas constituents (HCl, Cl2, SO2, SO3, NH3:NOx) as well as two commercially-available SCR catalysts. The results and data were reviewed by Reaction Engineering International, who prepared this technical update...

2005-12-23T23:59:59.000Z

22

Pilot-Scale Evaluation of Mercury Oxidation Across SCR Catalysts  

Science Conference Proceedings (OSTI)

This study evaluated the effects of addition of various acid gas species on the oxidation of elemental mercury across two commercial SCR catalysts in a pilot SCR reactor operating on a slipstream from a Powder River Basin coal-fired power plant. Tests were conducted by the Western Kentucky University (WKU) to evaluate the impact of flue gas constituents (HCl, HF, HBr, HI, SO3, NH3:NO), operating conditions, and catalyst design on mercury oxidation. The results and data were reviewed by Reaction Engineer...

2007-03-29T23:59:59.000Z

23

SCR Catalyst Disposal, Recycle, and On-Site Washing/Rejuvenation Options  

Science Conference Proceedings (OSTI)

Selective catalytic reduction SCR technology has enjoyed widespread implementation within the fossil fuel utility industry. The rate of spent SCR catalyst being generated is increasing proportional to the implementation of the technology, as well as the aging of the SCR fleet as a whole. Current projections estimate that nearly 30,000 tons per year of spent catalyst will be generated by 2020. This report addresses several topics associated with spent SCR catalyst, including catalyst disposal, recycle, an...

2008-03-31T23:59:59.000Z

24

Selective Catalytic Reduction (SCR) Procurement Guideline for Simple- and Combined-Cycle Combustion Turbines  

Science Conference Proceedings (OSTI)

This report is a selective catalytic reduction (SCR) procurement guideline for simple- and combined-cycle combustion turbines.

2008-03-17T23:59:59.000Z

25

Durability Evaluation of Urea SCR Catalysts for Heavy Duty Diesel Engines  

DOE Green Energy (OSTI)

Assess the potential long-term durability of various SCR catalyst formulations for mobile heavy duty diesel application.

Koshkarian, Kent

2000-08-20T23:59:59.000Z

26

Evaluation of Oil-Fired Gas Turbine Selective Catalytic Reduction (SCR) NOx Control  

Science Conference Proceedings (OSTI)

Utilities are experiencing increasing regulatory pressure to equip oil-fired power generation units with selective catalytic reduction (SCR) control systems. This report addresses factors utilities may wish to evaluate when justifying an NOx reduction system other than SCR or ensuring successful implementation of an SCR system.

1990-12-17T23:59:59.000Z

27

Approved Chemists  

Science Conference Proceedings (OSTI)

The Approved Chemist Program recognizes the most accomplished participants in the Laboratory Proficiency Program (LPP).Certification is based on performance during the previous LPP year.Approved Chemists can become referees for NOPA Soybean meal trading. A

28

Equilibrium Characteristics of Selective Catalytic Reduction (SCR) Catalyst Poisons  

Science Conference Proceedings (OSTI)

In Power River Basin (PRB) coal applications, phosphorus (P) is known as the primary catalyst poison. Recent utility experience shows that some units burning PRB coal are deactivating the selective catalytic reduction (SCR) catalyst more rapidly than others. The exact mechanism is not well understood but could be related to boiler type or combustion modifications leading to increased levels of phosphorus vaporization. With increased levels of phosphorus in flue gas, greater quantities of phosphorus would...

2011-12-20T23:59:59.000Z

29

JV 58-Effects of Biomass Combustion on SCR Catalyst  

DOE Green Energy (OSTI)

A portable slipstream selective catalytic reduction (SCR) reactor was installed at a biomass cofired utility boiler to examine the rates and mechanisms of catalyst deactivation when exposed to biomass combustion products. The catalyst was found to deactivate at a much faster rate than typically found in a coal-fired boiler, although this may have been the result of high ash loading rather than a general property of biomass combustion. Deactivation was mainly the result of alkali and alkaline-earth sulfate formation and growth in catalyst pores, apparently caused by alkaline-earth ash deposition on or near the pore sites. The high proportion of biomass in the fuel contributed to elevated levels of alkali and alkaline-earth material in the ash when compared to coal ash, and these higher levels provided more opportunity for sulfate formation. Based on laboratory tests, neither catalyst material nor ammonia contributed measurably to ash mass gains via sulfation. A model constructed using both field and laboratory data was able to predict catalyst deactivation of catalysts under subbituminous coal firing but performed poorly at predicting catalyst deactivation under cofiring conditions. Because of the typically higher-than coal levels of alkali and alkaline-earth elements present in biomass fuels that are available for sulfation at typical SCR temperatures, the use of SCR technology and biomass cofiring needs to be carefully evaluated prior to implementation.

Bruce C. Folkedahl; Christopher J. Zygarlicke; Joshua R. Strege; Donald P. McCollor; Jason D. Laumb; Lingbu Kong

2006-08-31T23:59:59.000Z

30

Local ammonia storage and ammonia inhibition in a monolithic copper-beta zeolite SCR catalyst  

SciTech Connect

Selective catalytic reduction of NO with NH{sub 3} was studied on a Cu-beta zeolite catalyst, with specific focus on the distributed NH{sub 3} capacity utilization and inhibition. In addition, several other relevant catalyst parameter distributions were quantified including the SCR zone, or catalyst region where SCR occurs, and NO and NH{sub 3} oxidation. We show that the full NH{sub 3} capacity (100% coverage) is used within the SCR zone for a range of temperatures. By corollary, unused NH{sub 3} capacity exists downstream of the SCR zone. Consequently, the unused capacity relative to the total capacity is indicative of the portion of the catalyst unused for SCR. Dynamic NH{sub 3} inhibition distributions, which create local transient conversion inflections, are measured. Dynamic inhibition is observed where the gas phase NH{sub 3} and NO concentrations are high, driving rapid NH{sub 3} coverage buildup and SCR. Accordingly, we observe dynamic inhibition at low temperatures and in hydrothermally aged states, but predict its existence very near the catalyst front in higher conversion conditions where we did not specifically monitor its impact. While this paper addresses some general distributed SCR performance parameters including Oxidation and SCR zone, our major new contributions are associated with the NH{sub 3} capacity saturation within the SCR zone and dynamic inhibition distributions and the associated observations. These new insights are relevant to developing accurate models, designs and control strategies for automotive SCR catalyst applications.

Auvray, Xavier P [Chalmers University of Technology, Sweden; Partridge Jr, William P [ORNL; Choi, Jae-Soon [ORNL; Pihl, Josh A [ORNL; Yezerets, Alex [Cummins, Inc; Kamasamudram, Krishna [Cummins, Inc; Currier, Neal [Cummins, Inc; Olsson, Louise [Chalmers University of Technology, Sweden

2012-01-01T23:59:59.000Z

31

State of Knowledge Concerning Fuel Impacts on SCR Performance and Longevity  

Science Conference Proceedings (OSTI)

Selective catalytic reduction (SCR) systems will be installed on about 100,000 MW of U.S. coal-fired generating capacity by 2004. Because the investment in capital, maintenance, and operation of SCR reactors will be the largest for any nitrogen oxides (NOx) control strategies implemented to date, many technical issues and economic factors are under active investigation to ensure the lowest compliance cost. This report summarizes the state of knowledge on deactivation of SCR catalysts caused by known pois...

2002-02-15T23:59:59.000Z

32

Laboratory-Scale Evaluation of the Mercury Chemical Reactions Across SCR Catalysts  

Science Conference Proceedings (OSTI)

This report summarizes laboratory-scale studies by Lehigh University to characterize and evaluate mercury chemical reactions across selective catalytic reduction (SCR) catalysts.

2005-04-18T23:59:59.000Z

33

Accelerated Thermal Aging of Fe-Zeolite SCR Catalysts on an Engine Bench.  

E-Print Network (OSTI)

?? Selective catalytic reduction (SCR) of NOx with urea/NH3 is a leading candidate to the impending more stringent emissions regulations for diesel engines. Currently, there (more)

Foster, Adam Lamar

2008-01-01T23:59:59.000Z

34

STATUS:  

E-Print Network (OSTI)

Thank you for your submittal of the Total Maximum Daily Load (TMDL) documents that address biological impairments in Moon, Stevens, and Rugg Brooks. These waterbodies are included on Vermonts 2008 303(d) list and were prioritized for TMDL development. The purpose of these TMDLs is to address aquatic life use impairments caused by stormwater runoff. The U.S. Environmental Protection Agency (EPA) hereby approves Vermonts October, 2008 versions of the three TMDLs (for Moon, Stevens, and Rugg Brooks) submitted with a cover letter dated October 2, 2008. EPA has determined that these TMDLs meet the requirements of 303(d) of the Clean Water Act (CWA), and of EPAs implementing regulations (40 CFR Part 130). A copy of our approval documentation is enclosed. Thank you again for your submittal. My staff and I look forward to continued cooperation with VTDEC in exercising our shared responsibility of implementing the requirements under Section 303(d) of the CWA. Sincerely, /s/

Laura Pelosi Commissioner; Rugg Brook Tmdls; Ken Moraff; Acting Director

2009-01-01T23:59:59.000Z

35

Formation of N2O and NO2 Across Conventional DeNOx SCR Catalysts  

Science Conference Proceedings (OSTI)

This project investigated the formation of N2O and NO2 across conventional DeNOx selective catalytic reduction (SCR) catalysts. N2O is a particularly strong greenhouse gas, and both N2O and NO2 may adversely impact downstream processes. Additional data related to their formation or reduction across SCR catalysts is desirable.

2009-12-15T23:59:59.000Z

36

Modeling Species Inhibition of NO Oxidation in Urea-SCR Catalysts for Diesel Engine NOx Control  

DOE Green Energy (OSTI)

Urea-selective catalytic reduction (SCR) catalysts are regarded as the leading NOx aftertreatment technology to meet the 2010 NOx emission standards for on-highway vehicles running on heavy-duty diesel engines. However, issues such as low NOx conversion at low temperature conditions still exist due to various factors, including incomplete urea thermolysis, inhibition of SCR reactions by hydrocarbons and H2O. We have observed a noticeable reduction in the standard SCR reaction efficiency at low temperature with increasing water content. We observed a similar effect when hydrocarbons are present in the stream. This effect is absent under fast SCR conditions where NO ~ NO2 in the feed gas. As a first step in understanding the effects of such inhibition on SCR reaction steps, kinetic models that predict the inhibition behavior of H2O and hydrocarbons on NO oxidation are presented in the paper. A one-dimensional SCR model was developed based on conservation of species equations and was coded as a C-language S-function and implemented in Matlab/Simulink environment. NO oxidation and NO2 dissociation kinetics were defined as a function of the respective adsorbates storage in the Fe-zeolite SCR catalyst. The corresponding kinetic models were then validated on temperature ramp tests that showed good match with the test data. Such inhibition models will improve the accuracy of model based control design for integrated DPF-SCR aftertreatment systems.

Devarakonda, Maruthi N.; Tonkyn, Russell G.; Tran, Diana N.; Lee, Jong H.; Herling, Darrell R.

2011-04-20T23:59:59.000Z

37

Ammonia Production and Utilization in a Hybrid LNT+SCR System  

DOE Green Energy (OSTI)

A hybrid LNT+SCR system is used to control NOx from a light-duty diesel engine with in-cylinder regeneration controls. A diesel oxidation catalyst and diesel particulate filter are upstream of the LNT and SCR catalysts. Ultraviolet (UV) adsorption spectroscopy performed directly in the exhaust path downstream of the LNT and SCR catalysts is used to characterize NH3 production and utilization in the system. Extractive exhaust samples are analyzed with FTIR and magnetic sector mass spectrometry (H2) as well. Furthermore, standard gas analyzers are used to complete the characterization of exhaust chemistry. NH3 formation increases strongly with extended regeneration (or over regeneration ) of the LNT, but the amount of NOx reduction occurring over the SCR catalyst is limited by the amount of NH3 produced as well as the amount of NOx available downstream of the LNT. Control of lean-rich cycling parameters enables control of the ratio of NOx reduction between the LNT and SCR catalysts. During lean-rich cycling, fuel penalties are similar for either LNT dominant or LNT with supplemental SCR NOx reduction. However, stored NH3 after multiple lean-rich cycles can enable continued NOx reduction by the SCR after lean-rich cycling stops; thus, requirements for active regeneration of the LNT+SCR system can be modified during transient operation.

Prikhodko, Vitaly Y [ORNL; Parks, II, James E [ORNL

2009-01-01T23:59:59.000Z

38

Characteristics of AlGaAs/GaAs heterostructure RT-SCR model  

Science Conference Proceedings (OSTI)

Electrical properties of a resonant-tunneling-semiconductor-controlled rectifier (RT-SCR) model have been presented. The current, temperature, gain, doping concentration, and layer size versus voltage relationships have been numerically obtained. The ... Keywords: RT-SCR, Semiconductor devices, Thyristors

B. D. Barkana

2008-12-01T23:59:59.000Z

39

Use power factor correction to cut SCR rig fuel bills  

SciTech Connect

When drilling with SCR-powered drilling rigs, there are specific instances on every well when the kVA capacity of the AC generators prohibits efficient engine loading. It then becomes necessary to run another engine-generator set to provide sufficient kVA to power the load, even though the kW required by the load can be furnished by existing engine(s) on line. The practice of running one more engine than can be fully loaded causes all engines on line to run at a less efficient point on the brake specific fuel consumption curve (BSFC) and therefore costs more in terms of engine hours, fuel and maintenance costs. This article presents a study of the load represented by the mud pump and drawworks along with a graphical representation that shows the effect of these loads on the engine generator system both with and without a power factor correction device.

Logan, R.T.

1983-09-01T23:59:59.000Z

40

Modeling Species Inhibition of NO oxidation in Urea-SCR Catalysts for Diesel Engine NOx Control  

DOE Green Energy (OSTI)

Urea-selective catalytic reduction (SCR) catalysts are regarded as the leading NOx aftertreatment technology to meet the 2010 NOx emission standards for on-highway vehicles running on heavy-duty diesel engines. However, issues such as low NOx conversion at low temperature conditions still exist due to various factors, including incomplete urea thermolysis, inhibition of SCR reactions by hydrocarbons and H2O. We have observed a noticeable reduction in the standard SCR reaction efficiency at low temperature with increasing water content. We observed a similar effect when hydrocarbons are present in the stream. This effect is absent under fast SCR conditions where NO ~ NO2 in the feed gas. As a first step in understanding the effects of such inhibition on SCR reaction steps, kinetic models that predict the inhibition behavior of H2O and hydrocarbons on NO oxidation are presented in the paper. A one-dimensional SCR model was developed based on conservation of species equations and was coded as a C-language S-function and implemented in Matlab/Simulink environment. NO oxidation and NO2 dissociation kinetics were defined as a function of the respective adsorbates storage in the SCR catalyst. The corresponding kinetic models were then validated on temperature ramp tests that showed good match with the test data.

Devarakonda, Maruthi N.; Tonkyn, Russell G.; Tran, Diana N.; Lee, Jong H.; Herling, Darrell R.

2010-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Pilot Evaluation of the Impact of Chloride on Selective Catalytic Reduction (SCR) Mercury Oxidation  

Science Conference Proceedings (OSTI)

This study investigated the effect of blending Powder River Basin (PRB) coal with an Eastern bituminous coal on the speciation of Hg across a selective catalytic reduction (SCR) catalyst. A pilot-scale coal combustor equipped with an SCR reactor for NOx control was used to evaluate the effect of coal blending on improving Hg oxidation across an SCR catalyst. Several parameters such as the ratio of PRB/bituminous coal blend and the concentrations of hydrogen halides (HCl, HBr, and HF) and halogens (Cl2 an...

2008-03-19T23:59:59.000Z

42

Form Approved  

U.S. Energy Information Administration (EIA) Indexed Site

Approved Approved OMB No. 1905-0092. El A 457B (Expires May 31, 1990.) This survey is voluntary and authorized under the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. Information about specific households will be kept strictly confidential. The data will be summarized within large groupings for statistical purposes. 1987 Residential Energy Consumption Survey Energy Information Administration U.S. Department of Energy Location # Housing Unit # 111-116 117-118 EIA 457B * 1987 Residential Energy Consumption Survey TIME INTERVIEW STARTED 1. In what year did your family this (house/apartment)? AM PM move into 01 [ ] Before 1940 02 [ ] 1940-1949 03 [ ] 1950-1959

43

Form Approved  

U.S. Energy Information Administration (EIA) Indexed Site

Approved Approved OMB No. 1905-0092 . EIA 4578 (Expire* August 31,1986} Th|« turvey Is voluntary and authorized under (he Federal Energy Administration Act of 1974 (Public La* 93-275) a* amended. Information about *p*clflc houiehold* will t>* kept strictly confidential. The d*la will be summarized within large grouping! for tatlttlcal purposes. Residential Energy Consumption Survey Fall-Winter* 1984-1985 Energy Information Administration U.S. Department of Energy Location ff. Housing UnN *.. 111-116 117-118 TIME INTERVIEW STARTED 1. In what year did your family this (house/apartment)? AM PM move into 01 [] BEFORE 1940 02 [] 1940-1949 03 [] 1950-1959 04 [] 1960-1964 05 [] 1965-1969 06 [] 1970-1974 07 [] 1975-1976 08 [] 1977-1979 09 [] 1980 10 [] 1981 121 11 [] 1982 122

44

Evaluation of Mercury Emissions from Coal-Fired Facilities with SCR and FGD Systems  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP)--wet flue gas desulfurization (FGD) combination or a spray dyer absorber--fabric filter (SDA-FF) combination. In this program CONSOL is determining mercury speciation and removal at 10 coal-fired facilities. The principal purpose of this work is to develop a better understanding of the potential mercury removal ''co-benefits'' achieved by NO{sub x}, and SO{sub 2} control technologies. It is expected that these data will provide the basis for fundamental scientific insights into the nature of mercury chemistry in flue gas, the catalytic effect of SCR systems on mercury speciation and the efficacy of different FGD technologies for mercury capture. Ultimately, this insight could help to design and operate SCR and FGD systems to maximize mercury removal. The objectives are (1) to evaluate the effect of SCR on mercury capture in the ESP-FGD and SDA-FF combinations at coal-fired power plants, (2) evaluate the effect of SCR catalyst degradation on mercury capture; (3) evaluate the effect of low load operation on mercury capture in an SCR-FGD system, and (4) collect data that could provide the basis for fundamental scientific insights into the nature of mercury chemistry in flue gas, the catalytic effect of SCR systems on mercury speciation and the efficacy of different FGD technologies for mercury capture. This document, the ninth in a series of topical reports, describes the results and analysis of mercury sampling performed on Unit 1 at Plant 7, a 566 MW unit burning a bituminous coal containing 3.6% sulfur. The unit is equipped with a SCR, ESP, and wet FGD to control NO{sub x}, particulate, and SO{sub 2} emissions, respectively. Four sampling tests were performed in August 2004 during ozone season with the SCR operating; flue gas mercury speciation and concentrations were determined at the SCR inlet, SCR outlet, air heater outlet (ESP inlet), ESP outlet (FGD inlet), and at the stack (FGD outlet) using the Ontario Hydro method. Three sampling tests were also performed in November 2004 during non-ozone season with the SCR bypassed; flue gas mercury speciation and concentrations were determined at the ESP outlet (FGD inlet), and at the stack (FGD outlet). Process samples for material balances were collected during the flue gas measurements. The results show that, at the point where the flue gas enters the FGD, a greater percentage of the mercury was in the oxidized form when the SCR was operating compared to when the SCR was bypassed (97% vs 91%). This higher level of oxidation resulted in higher mercury removals in the FGD because the FGD removed 90-94% of the oxidized mercury in both cases. Total coal-to-stack mercury removal was 86% with the SCR operating, and 73% with the SCR bypassed. The average mercury mass balance closure was 81% during the ozone season tests and 87% during the non-ozone season tests.

J. A. Withum; S. C. Tseng; J. E. Locke

2006-01-31T23:59:59.000Z

45

Oil-Fired Combustion Turbine SCR NOx Control Testing and Evaluation  

Science Conference Proceedings (OSTI)

This report contains results of a Tailored Collaboration project to determine the technical feasibility and cost of selective catalytic reduction (SCR) as applied to 0.4%-sulfur fuel oil-fired combustion turbines.

1997-10-17T23:59:59.000Z

46

Calibration and performance of a selective catalytic reduction (SCR) bench rig for NOx? emissions control  

E-Print Network (OSTI)

A laboratory test rig was designed and built to easily test SCR (Selective Catalytic Reduction) technology. Equipped with three 6 kW heaters, connections for liquid N2 and an assortment of test gases, and a connection with ...

Castro Galnares, Sebastin (Castro Galnares Wright Paz)

2008-01-01T23:59:59.000Z

47

Fuel Impacts on SCR Catalyst Life and Performance: Analysis of Field Data  

Science Conference Proceedings (OSTI)

In the United States, selective catalytic reduction (SCR) is being used on approximately 100 GW of coal-fired utility boilers, a 12-billion-dollar investment by the utility industry. In addition to the initial capital expenditure, catalyst management and replacement strategies will have a major impact on operations and maintenance costs at each SCR site. EPRI and Post Combustion NOx Control Program funders have sponsored tests to assess catalyst life and performance issues and to develop data for making ...

2004-10-13T23:59:59.000Z

48

Selective Catalytic Reduction (SCR) Recycle, Re-Use and Disposal Options  

Science Conference Proceedings (OSTI)

The widespread utilization of Selective Catalyst Reduction (SCR) technology will create a significant amount of spent catalyst in the coming years. This report summarizes the current disposal methods and regulations associated with spent SCR catalysts. Since catalyst recycle and re-use is currently limited to reconditioning and bulk metals recovery, an effort was made to identify and evaluate alternate recycle/re-use routes for the ceramic portion of the material, in particular, the direct utilization of...

2009-12-16T23:59:59.000Z

49

Multimedia Mercury Fate at Coal-Fired Power Plants Equipped With SCR and Wet FGD Controls  

Science Conference Proceedings (OSTI)

Given the current regulatory climate in the United States, a number of selective catalytic reduction (SCR) and flue gas desulfurization (FGD) systems will be installed at new and existing coal-fired power plants to remove nitrogen oxide (NOx), sulfur dioxide (SO2), and mercury. The multimedia fate of trace metal species, especially mercury, in SCR/wet FGD systems is not well understood. Understanding and quantifying the amount of mercury removed from the flue gas and distributed to the solid and aqueous ...

2008-03-19T23:59:59.000Z

50

Form Approv  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'JOE I' ':0 'JOE I' ':0 ) e " Flee/romc Form Approv ed by CGIR· 01120195 (8 ./1" United States Government Department of Energy Bonneville Power Administra ion memorandum DATE : uC l J !:' ZD y REPLY TO ATTN OF : KEP-4 SUBJECT: Environmental Clearance Memorandum TO ; Rob Ochs Project Manager - TELM-TPP-3 Proposed Action: Lane-Wendson No.1 Structure 10/5 Access Road Improvement and Pole Replacement Project Budget Information: Work Order # 224549 PP&A Project No.: 1117 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Sub part 0,10 C.F.R. Part) 021): B 1.3, Routine maintenance activities ... for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ... .are required to maintain

51

Evaluation of Mercury Emissions from Coal-Fired Facilities with SCR and FGD Systems  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP)--wet flue gas desulfurization (FGD) combination or a spray dyer absorber--fabric filter (SDA-FF) combination. In this program CONSOL is determining mercury speciation and removal at 10 coal-fired facilities. The principal purpose of this work is to develop a better understanding of the potential mercury removal ''co-benefits'' achieved by NO{sub x}, and SO{sub 2} control technologies. It is expected that this data will provide the basis for fundamental scientific insights into the nature of mercury chemistry in flue gas, the catalytic effect of SCR systems on mercury speciation and the efficacy of different FGD technologies for mercury capture. Ultimately, this insight could help to design and operate SCR and FGD systems to maximize mercury removal. The objectives are (1) to evaluate the effect of SCR on mercury capture in the ESP-FGD and SDA-FF combinations at coal-fired power plants, (2) evaluate the effect of SCR catalyst degradation on mercury capture; (3) evaluate the effect of low load operation on mercury capture in an SCR-FGD system, and (4) collect data that could provide the basis for fundamental scientific insights into the nature of mercury chemistry in flue gas, the catalytic effect of SCR systems on mercury speciation and the efficacy of different FGD technologies for mercury capture. This document, the tenth in a series of topical reports, describes the results and analysis of mercury sampling performed on two 468 MW units burning bituminous coal containing 1.3-1.7% sulfur. Unit 2 is equipped with an SCR, ESP, and wet FGD to control NO{sub x}, particulate, and SO{sub 2} emissions, respectively. Unit 1 is similar to Unit 2, except that Unit 1 has no SCR for NOx control. Four sampling tests were performed on both units in January 2005; flue gas mercury speciation and concentrations were determined at the economizer outlet, air heater outlet (ESP inlet), ESP outlet (FGD inlet), and at the stack (FGD outlet) using the Ontario Hydro method. Process samples for material balances were collected with the flue gas measurements. The results show that the SCR increased the oxidation of the mercury at the air heater outlet. At the exit of the air heater, a greater percentage of the mercury was in the oxidized and particulate forms on the unit equipped with an SCR compared to the unit without an SCR (97.4% vs 91%). This higher level of oxidation resulted in higher mercury removals in the scrubber. Total mercury removal averaged 97% on the unit with the SCR, and 87% on the unit without the SCR. The average mercury mass balance closure was 84% on Unit 1 and 103% on Unit 2.

J. A. Withum; J. E. Locke

2006-02-01T23:59:59.000Z

52

Impacts of Texas Lignite Coal on SCR Catalyst Life and Performance: Field Data from TXU's Martin Lake Plant  

Science Conference Proceedings (OSTI)

Selective catalytic reduction (SCR) systems are being broadly applied to power generating units fired with Power River Basin (PRB) and bituminous coals and natural gas. To develop an understanding of the potential deactivation and erosion of SCR catalyst in Texas-lignite-fired units, an in-situ mini SCR reactor was used to test two types of catalyst at TXU Energy's Martin Lake Unit 3. Prior to this test program, no long-term test data on the effects of Texas lignite on SCR catalyst life and performance e...

2003-12-11T23:59:59.000Z

53

Development of an open loop fuzzy logic urea dosage controller for use with an SCR equipped HDD engine.  

E-Print Network (OSTI)

??Selective Catalytic Reduction (SCR) has been shown to be the most promising exhaust aftertreatment system for reducing oxides of nitrogen in near term in-use applications. (more)

Adams, Theodore R. (Theodore Richard)

2008-01-01T23:59:59.000Z

54

EVALUATION OF MERCURY EMISSIONS FROM COAL-FIRED FACILITIES WITH SCR AND FGD SYSTEMS  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), evaluated the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP)-wet flue gas desulfurization (FGD) combination or a spray dyer absorber-fabric filter (SDA-FF) combination. In this program CONSOL determined mercury speciation and removal at 10 bituminous coal-fired facilities; at four of these facilities, additional tests were performed on units without SCR, or with the existing SCR bypassed. This project final report summarizes the results and discusses the findings of the body of work as a whole. Eleven Topical Reports were issued (prior to this report) that describe in great detail the sampling results at each of the ten power plants individually. The results showed that the SCR-FGD combination removed a substantial fraction of mercury from flue gas. The coal-to-stack mercury removals ranged from 65% to 97% for the units with SCR and from 53% to 87% for the units without SCR. There was no indication that any type of FGD system was more effective at mercury removal than others. The coal-to-stack mercury removal and the removal in the wet scrubber were both negatively correlated with the elemental mercury content of the flue gas and positively correlated with the scrubber liquid chloride concentration. The coal chlorine content was not a statistically significant factor in either case. Mercury removal in the ESP was positively correlated with the fly ash carbon content and negatively correlated with the flue gas temperature. At most of the units, a substantial fraction (>35%) of the flue gas mercury was in the elemental form at the boiler economizer outlet. After passing through the SCR-air heater combination very little of the total mercury (<10%) remained in the elemental form in the flue gas; this was true for all SCR catalyst types and sources. Although chlorine has been suggested as a factor affecting the mercury speciation in flue gas, coal chlorine was not a statistically significant factor affecting mercury speciation at the economizer exit or at the air heater exit. The only statistically significant factors were the coal ash CaO content and the fly ash carbon content; the fraction of mercury in the elemental form at the economizer exit was positively correlated with both factors. In a direct comparison at four SCR-equipped units vs. similar units at the same sites without SCR (or with the SCR bypassed), the elemental mercury fractions (measured at the ESP outlet) were lower, and the coal-to-stack mercury removals were higher, when the SCR was present and operating. The average coal-to-stack mercury removal at the four units without an operating SCR was 72%, whereas the average removal at the same sites with operating SCRs was 88%. The unit mercury mass balance (a gauge of the overall quality of the tests) at all of the units ranged from 81% to 113%, which were within our QA/QC criterion of 80-120%.

J.A. Withum

2006-03-07T23:59:59.000Z

55

OXIDATION OF MERCURY ACROSS SCR CATALYSTS IN COAL-FIRED POWER PLANTS BURING LOW RANK FUELS  

SciTech Connect

This is the sixth Quarterly Technical Report for DOE Cooperative Agreement No: DE-FC26-03NT41728. The objective of this program is to measure the oxidation of mercury in flue gas across SCR catalyst in a coal-fired power plant burning low rank fuels using a slipstream reactor containing multiple commercial catalysts in parallel. The Electric Power Research Institute (EPRI) and Argillon GmbH are providing co-funding for this program. This program contains multiple tasks and good progress is being made on all fronts. During this quarter, a review of the available data on mercury oxidation across SCR catalysts from small, laboratory-scale experiments, pilot-scale slipstream reactors and full-scale power plants was carried out. Data from small-scale reactors obtained with both simulated flue gas and actual coal combustion flue gas demonstrated the importance of temperature, ammonia, space velocity and chlorine on mercury oxidation across SCR catalyst. SCR catalysts are, under certain circumstances, capable of driving mercury speciation toward the gas-phase equilibrium values at SCR temperatures. Evidence suggests that mercury does not always reach equilibrium at the outlet. There may be other factors that become apparent as more data become available.

Constance Senior

2004-07-30T23:59:59.000Z

56

Modeling Species Inhibition and Competitive Adsorption in Urea-SCR Catalysts  

Science Conference Proceedings (OSTI)

Although the urea-SCR technology exhibits high NOx reduction efficiency over a wide range of temperatures among the lean NOx reduction technologies, further improvement in low-temperature performance is required to meet the future emission standards and to lower the system cost. In order to improve the catalyst technologies and optimize the system performance, it is critical to understand the reaction mechanisms and catalyst behaviors with respect to operating conditions. Urea-SCR catalysts exhibit poor NOx reduction performance at low temperature operating conditions (T catalysts based on bench reactor experiments. We further use the competitive adsorption (CA) model to develop a standard SCR model based on previously identified kinetics. Simulation results indicate that the CA model predicts catalyst outlet NO and NH3 concentrations with minimal root mean square error.

Devarakonda, Maruthi N.; Tonkyn, Russell G.; Lee, Jong H.

2012-04-16T23:59:59.000Z

57

OXIDATION OF MERCURY ACROSS SCR CATALYSTS IN COAL-FIRED POWER PLANTS BURNING LOW RANK FUELS  

SciTech Connect

This is the fifth Quarterly Technical Report for DOE Cooperative Agreement No: DE-FC26-03NT41728. The objective of this program is to measure the oxidation of mercury in flue gas across SCR catalyst in a coal-fired power plant burning low rank fuels using a slipstream reactor containing multiple commercial catalysts in parallel. The Electric Power Research Institute (EPRI) and Argillon GmbH are providing co-funding for this program. This program contains multiple tasks and good progress is being made on all fronts. During this quarter, the available data from laboratory, pilot and full-scale SCR units was reviewed, leading to hypotheses about the mechanism for mercury oxidation by SCR catalysts.

Constance Senior

2004-04-30T23:59:59.000Z

58

DEVELOPMENT OF UREA-SCR FOR HEAVY-DUTY TRUCKS DEMONSTRATION UPDATE  

DOE Green Energy (OSTI)

This study included engine cell and vehicle tests. The engine cell tests are aimed at determining NOX reduction using the US transient and OICA emissions test cycles. These cycles will be included in future US HD emissions standards. The vehicle tests will show urea-SCR system performance during real-world operation. These tests will prove that the technology can be successfully implemented and demonstrated over-the-road. The program objectives are to: (a) apply urea-SCR to a US HD diesel engine; (b) determine engine cell emissions reduction during US-transient and OICA cycles; (c) apply urea-SCR to a US HD diesel truck; and (d) determine NOX reduction and urea consumption during over-the-road operation.

Miller, William

2000-08-20T23:59:59.000Z

59

Impacts of PRB Coals on SCR Catalyst Life and Performance: Field Data from In Situ Reactors  

Science Conference Proceedings (OSTI)

With the greater use of both Powder River basin (PRB) coals and selective catalytic reduction (SCR) in the utility industry, there is a concern about the effects of the high calcium coals on SCR catalyst life and performance. Using the "in situ" reactor approach, two catalysts are invloved in an ongoing long-term activity evaluation program at two test sites. The "in situ" reactor is a 2" by 2" (50mm x 50mm) cross-section probe installed in the economizer exit of utility boilers. It subjects catalyst sam...

2000-12-06T23:59:59.000Z

60

Design and Cost Estimating Procedures for SCR and SNCR Retrofits on Gas- and Oil-Fired Boilers  

Science Conference Proceedings (OSTI)

Utility companies have been reevaluating the feasibility of selective catalytic reduction (SCR) and selective non-catalytic reduction (SNCR) retrofits in order to meet increasingly stringent nitrogen oxides (NOx) emission limits. This report describes two EPRI-developed models for helping utility companies screen the cost effectiveness of SCR and SNCR technologies for application at specific gas- and oil-fired boiler sites.

2002-09-04T23:59:59.000Z

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

A Case Study of the Selective Catalytic Reduction (SCR) System at the Algonquin Power Energy-From-Waste Facility  

E-Print Network (OSTI)

available NOx control technologies, the APEFW facility chose to install a Selective Catalytic Reduction (SCR on the reduction of NOx to nitrogen gas. SNCR involves the addition of urea or ammonia at high furnace temperaturesA Case Study of the Selective Catalytic Reduction (SCR) System at the Algonquin Power Energy

Columbia University

62

Mercury Measurements Characterizing the Impact of SCR on Mercury: Consol Test Site 5 - Eastern Bituminous Coal-Fired Power Plant wi th an SCR, ESP, and Wet FGD  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP) - wet flue gas desulfurization (FGD) combination or a spray dyer absorber 8212 fabric filter (SDA-FF) combination. In this program CONSOL is determining ...

2005-11-28T23:59:59.000Z

63

Mercury Measurements Characterizing the Impact of SCR on Mercury: Consol Site 7 - Eastern Bituminous Coal-Fired Power Plant with an SCR, ESP, and Wet FGD  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP) - wet flue gas desulfurization (FGD) combination or a spray dyer absorber fabric filter (SDA-FF) combination. In this program CONSOL is determining mercu...

2006-07-26T23:59:59.000Z

64

Mercury Measurements Characterizing the Impact of SCR on Mercury: Consol Test Site 4 - Eastern Bituminous Coal-Fired Power Plant wit h an SCR, ESP, and Wet FGD  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP) - wet flue gas desulfurization (FGD) combination or a spray dyer absorber fabric filter (SDA-FF) combination. In this program CONSOL is determining mercu...

2006-07-31T23:59:59.000Z

65

Mercury Measurements Characterizing the Impact of SCR on Mercury: Consol Site 6 - Eastern Bituminous Coal-Fired Power Plant with an SCR, ESP, and Wet FGD  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP) - wet flue gas desulfurization (FGD) combination or a spray dyer absorber 8211 fabric filter (SDA-FF) combination. In this program CONSOL is determining ...

2006-07-31T23:59:59.000Z

66

EVALUATION OF MERCURY EMISSIONS FROM COAL-FIRED FACILITIES WITH SCR AND FGD SYSTEMS  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP) - wet flue gas desulfurization (FGD) combination or a spray dyer absorber--fabric filter (SDA-FF) combination. In this program CONSOL is determining mercury speciation and removal at 10 coal-fired facilities. The objectives are (1) to evaluate the effect of SCR on mercury capture in the ESP-FGD and SDA-FF combinations at coal-fired power plants, (2) evaluate the effect of catalyst degradation on mercury capture; (3) evaluate the effect of low load operation on mercury capture in an SCR-FGD system, and (4) collect data that could provide the basis for fundamental scientific insights into the nature of mercury chemistry in flue gas, the catalytic effect of SCR systems on Hg speciation and the efficacy of different FGD technologies for Hg capture. This document, the second in a series of topical reports, describes the results and analysis of mercury sampling performed on a 330 MW unit burning a bituminous coal containing 1.0% sulfur. The unit is equipped with a SCR system for NOx control and a spray dryer absorber for SO{sub 2} control followed by a baghouse unit for particulate emissions control. Four sampling tests were performed in March 2003. Flue gas mercury speciation and concentrations were determined at the SCR inlet, air heater outlet (ESP inlet), and at the stack (FGD outlet) using the Ontario Hydro method. Process stream samples for a mercury balance were collected to coincide with the flue gas measurements. Due to mechanical problems with the boiler feed water pumps, the actual gross output was between 195 and 221 MW during the tests. The results showed that the SCR/air heater combination oxidized nearly 95% of the elemental mercury. Mercury removal, on a coal-to-stack basis, was 87%. The mercury material balance closures for the four tests conducted at the plant ranged from 89% to 114%, with an average of 100%. These results appear to show that the SCR had a positive effect on mercury removal. In earlier programs, CONSOL sampled mercury at six plants with wet FGDs for SO{sub 2} control without SCR catalysts. At those plants, an average of 61 {+-} 15% of the mercury was in the oxidized form at the air heater outlet. The principal purpose of this work is to develop a better understanding of the potential Hg removal ''co-benefits'' achieved by NOx, and SO{sub 2} control technologies. It is expected that this data will provide the basis for fundamental scientific insights into the nature of Hg chemistry in flue gas, the catalytic effect of SCR systems on Hg speciation and the efficacy of different FGD technologies for Hg capture. Ultimately, this insight could help to design and operate SCR and FGD systems to maximize Hg removal.

J. A. Withum; S.C. Tseng; J. E. Locke

2004-10-31T23:59:59.000Z

67

Application of RBF-type ARX Modeling and Control to Gas Turbine Combined Cycle SCR Systems  

E-Print Network (OSTI)

Application of RBF-type ARX Modeling and Control to Gas Turbine Combined Cycle SCR Systems Y, nonlinear model-based predictive control, energy saving. 1. INTRODUCTION In Japan, GTCC(Gas Turbine Combined gas-firing GTCC power plant is most effective in terms of thermal efficiency and lower CO2 energy

Ozaki, Tohru

68

Impacts of PRB Coals on SCR Catalyst Life and Performance: Field Data from Ameren's Sioux Plant  

Science Conference Proceedings (OSTI)

The United States utility industry is making greater use of Powder River Basin (PRB) coals while at the same time moving towards selective catalytic reduction (SCR) for compliance with nitrogen oxide (NOx) regulations. Some catalyst test coupons in PRB fired boilers have reportedly experienced accelerated deactivation. This project studied the effects of PRB flue gas on catalytic samples at Ameren's Sioux Station.

2001-11-28T23:59:59.000Z

69

Detailed modeling of the evaporation and thermal decomposition of urea-water-solution in SCR systems  

E-Print Network (OSTI)

NOx reduction in net oxidizing exhaust gas, SAE International Paper N° 900496, 99, 1990. [2] KOEBEL M on the performance of metal exchanged zeolites for the selective catalytic reduction of NOx: Part I. Pyrolysis thermolysis and NOx reduction with and without SCR catalysts, Applied Catalysis B: Environmental, 46, pp.17

70

SCR Catalyst Disposal, Recycle, and On-site Washing Options and Experience  

Science Conference Proceedings (OSTI)

As Selective Catalytic Reduction (SCR) technology becomes more widespread and the catalyst fleet ages, cost-effective and environmentally friendly approaches are need to handle the increasing volumes of spent catalyst or extend its life through simple on-site processing. This report addresses various issues related to catalyst rejuvenation, cleaning, recycling, and disposal.

2008-12-03T23:59:59.000Z

71

SCR SYSTEMS FOR HEAVY DUTY TRUCKS: PROGRESS TOWARDS MEETING EURO 4 EMISSION STANDARDS IN 2005  

DOE Green Energy (OSTI)

Emissions of diesel engines contain some components, which support the generation of smog and which are classified hazardous. Exhaust gas aftertreatment is a powerful tool to reduce the NOx and Particulate emissions. The NOx-emission can be reduced by the SCR technology. SCR stands for Selective Catalytic Reduction. A reduction agent has to be injected into the exhaust upstream of a catalyst. On the catalyst the NOx is reduced to N2 (Nitrogen) and H2O (Water). This catalytic process was developed in Japan about 30 years ago to reduce the NOx emission of coal-fired power plants. The first reduction agent used was anhydrous ammonia (NH3). SCR technology was used with diesel engines starting mid of the 80s. First applications were stationary operating generator-sets. In 1991 a joint development between DaimlerChrysler, MAN, IVECO and Siemens was started to use SCR technology for the reduction of heavy duty trucks. Several fleet tests demonstrated the durability of the systems. To day, SCR technology is the most promising technology to fulfill the new European Regulations EURO 4 and EURO 5 being effective Oct. 2005 and Oct. 2008. The efficient NOx reduction of the catalyst allows an engine calibration for low fuel consumption. DaimlerChrysler decided to use the SCR technology on every heavy duty truck and bus in Europe and many other truck manufacturers will introduce SCR technology to fulfill the 2005 emission regulation. The truck manufacturers in Europe agreed to use aqueous solution of Urea as reducing agent. The product is called AdBlue. AdBlue is a non toxic, non smelling liquid. The consumption is about 5% of the diesel fuel consumption to reduce the NOx emissions. A small AdBlue tank has to be installed to the vehicle. With an electronically controlled dosing system the AdBlue is injected into the exhaust. The dosing system is simple and durable. It has proven its durability during winter and summer testing as well as in fleet tests. The infrastructure for AdBlue is under evaluation in Europe by Urea Producers and Mineral Oil companies to be readily available in time. Urea is one of the most common chemical products in the world and the production and the distribution very much experienced. However, a pure grade is needed for automotive application and requires special attention.

Frank, W; Huethwohl, G; Maurer, B

2003-08-24T23:59:59.000Z

72

Modeling of selective catalytic reduction (SCR) of nitric oxide with ammonia using four modern catalysts  

E-Print Network (OSTI)

In this work, the steady-state performance of zeolite-based Cu-ZSM-5, vanadium based honeycomb monolith catalysts (V), vanadium-titanium based pillared inter layered clay catalyst (V-Ti PLIC) and vanadium-titanium-tungsten-based honeycomb monolith catalysts (V-Ti-W) was investigated in the selective catalytic reduction process (SCR) for NO removal using NH3 in presence of oxygen. The objective is to obtain the expression that would predict the conversion performance of the catalysts for different values of the SCR process parameters, namely temperature, inlet oxygen concentration and inlet ammonia concentration. The NOx emission, its formation and control methods are discussed briefly and then the fundamentals of the SCR process are described. Heat transfer based and chemical kinetics based SCR process models are discussed and widely used rate order based model are reviewed. Based on the experimental data, regression analysis was performed that gives an expression for predicting the SCR rate for the complete temperature range and the rate order with respect to inlet oxygen and ammonia concentration. The average activation energy for the SCR process was calculated and optimum operating conditions were determined for each of the catalyst. The applicable operating range for the catalyst depends on the NO conversion as well as on the ammonia slip and the N2O and NO2 emission. The regression analysis was repeated for the applicable range and an expression was obtained that can be used to estimate the catalyst performance. For the Cu-ZSM-5, the best performance was observed for 400oC, 660 ppm inlet ammonia concentration and 0.1% inlet oxygen concentration. For the V based honeycomb monolith catalyst, the best performance was observed for 300oC, 264 ppm inlet ammonia concentration and 3% inlet oxygen concentration. For the V-Ti based PLIC catalyst, the best performance was observed for 350oC, 330 ppm inlet ammonia concentration and 3% inlet oxygen concentration. For the V-Ti-W based honeycomb monolith catalyst, the best performance was observed for 300oC, 330 ppm inlet ammonia concentration and 3% inlet oxygen concentration. The conversion performance of all of these catalysts is satisfactory for the industrial application. At the operating conditions listed above, the N2O emission is less than 20 ppm and the NO2 emission is less than 10 ppm. The results were validated by comparing the findings with the similar work by other research groups. The mechanism of SCR process is discussed for each of the catalyst. The probable reactions are listed and adsorption and desorption process are studied. The various mechanisms proposed by the researchers are discussed briefly. It is concluded that V-Ti-W and Cu-ZSM-5 catalyst are very promising for SCR of NOx. The expressions can be used to estimate the conversion performance and can be utilized for optimal design and operation. The expressions relate the SCR rate to the input parameters such as temperature and inlet oxygen and ammonia concentration hence by controlling these parameters desired NOx reduction can be achieved with minimal cost and emission.

Sharma, Giriraj

2004-08-01T23:59:59.000Z

73

EVALUATION OF MERCURY EMISSIONS FROM COAL-FIRED FACILITIES WITH SCR AND FGD SYSTEMS  

SciTech Connect

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP)--wet flue gas desulfurization (FGD) combination or a spray dryer absorber--fabric filter (SDA-FF) combination. In this program CONSOL is determining mercury speciation and removal at 10 coal-fired facilities. The objectives are (1) to evaluate the effect of SCR on mercury capture in the ESP-FGD and SDA-FF combinations at coal-fired power plants, (2) evaluate the effect of catalyst degradation on mercury capture; (3) evaluate the effect of low load operation on mercury capture in an SCR-FGD system, and (4) collect data that could provide the basis for fundamental scientific insights into the nature of mercury chemistry in flue gas, the catalytic effect of SCR systems on mercury speciation and the efficacy of different FGD technologies for mercury capture. This document, the seventh in a series of topical reports, describes the results and analysis of mercury sampling performed on a 1,300 MW unit burning a bituminous coal containing three percent sulfur. The unit was equipped with an ESP and a limestone-based wet FGD to control particulate and SO2 emissions, respectively. At the time of sampling an SCR was not installed on this unit. Four sampling tests were performed in September 2003. Flue gas mercury speciation and concentrations were determined at the ESP outlet (FGD inlet), and at the stack (FGD outlet) using the Ontario Hydro method. Process stream samples for a mercury balance were collected to coincide with the flue gas measurements. The results show that the FGD inlet flue gas oxidized:elemental mercury ratio was roughly 2:1, with 66% oxidized mercury and 34% elemental mercury. Mercury removal, on a coal-to-stack basis, was 53%. The average Hg concentration in the stack flue gas was 4.09 {micro}g/m{sup 3}. The average stack mercury emission was 3.47 Ib/TBtu. The mercury material balance closures ranged from 87% to 108%, with an average of 97%. A sampling program similar to this one was performed on a similar unit (at the same plant) that was equipped with an SCR for NOx control. Comparison of the results from the two units show that the SCR increases the percentage of mercury that is in the oxidized form, which, in turn, lends to more of the total mercury being removed in the wet scrubber. The principal purpose of this work is to develop a better understanding of the potential mercury removal ''co-benefits'' achieved by NOx, and SO{sub 2} control technologies. It is expected that this data will provide the basis for fundamental scientific insights into the nature of mercury chemistry in flue gas, the catalytic effect of SCR systems on mercury speciation and the efficacy of different FGD technologies for mercury capture. Ultimately, this insight could help to design and operate SCR and FGD systems to maximize mercury removal.

J.A. Withum; S.C. Tseng; J.E. Locke

2005-11-01T23:59:59.000Z

74

Impacts of PRB Coals on SCR Catalyst Life and Performance: Field Data from Texas Genco's W.A. Parish Plant  

Science Conference Proceedings (OSTI)

The United States utility industry is seeing a trend of greater use of Powder River Basin (PRB) coals while at the same time moving towards selective catalytic reduction (SCR) for compliance with nitrogen oxides (NOx) regulations. Previous catalyst coupon tests have raised concerns within the industry that PRB coal ash could result in accelerated catalyst deactivation. The study reported here exposed catalyst coupons to PRB flue gas for 10,000 hours under realistic SCR reactor conditions in order to moni...

2002-11-15T23:59:59.000Z

75

Selective Catalytic Reduction (SCR) Catalyst Reconditioning as Part of Catalyst Management  

Science Conference Proceedings (OSTI)

Previous EPRI work on catalyst reconditioning for selective catalytic reduction (SCR) systems sought to offer guidance to catalyst users as to the expected performance of reconditioned catalysts, both in the short term and long term, as well as to offer guidance as to the actual processes used for catalyst reconditioning. The present work seeks to compile these past efforts into a single document offering maximum utility to catalyst end users. In addition, the report updates previous findings where pract...

2009-12-21T23:59:59.000Z

76

Effects of Chlorine and Other Flue Gas Parameters on SCR Catalyst Mercury Oxidation and Capture Efficiencies  

Science Conference Proceedings (OSTI)

Although catalyst behavior is relatively well understood with respect to deNOx and SO2 oxidation, relatively little is known about mercury oxidation behavior. This test program seeks to evaluate the mercury oxidation performance of multiple types of Selective Catalytic Reduction (SCR) catalyst as a function of changes in various flue gas parameters, including chlorine level, ammonia level, flow rate, and temperature. This interim report describes the results from parametric testing on the first catalyst.

2008-08-27T23:59:59.000Z

77

Mitigation of SCR-Ammonia Related Aqueous Effects in a Fly Ash Pond  

Science Conference Proceedings (OSTI)

Contaminated fly ash resulting from secondary injection of ammonia to mitigate SO3 produced by a selective catalytic reduction (SCR) system altered the water quality of a fly ash pond at a coal-fired power generation station. This project attempted to improve water quality by encouraging the growth of algae in the pond to remove ammonia, while keeping other important parameters (pH, total suspended solids, Biological Oxygen Demand, and metals) within allowable limits.

2006-02-07T23:59:59.000Z

78

Impact of Biodiesel Impurities on the Performance and Durability of DOC, DPF and SCR Technologies: Preprint  

DOE Green Energy (OSTI)

An accelerated durability test method determined the potential impact of biodiesel ash impurities, including engine testing with multiple diesel particulate filter substrate types, as well as diesel oxidation catalyst and selective catalyst reduction catalysts. The results showed no significant degradation in the thermo-mechanical properties of a DPF after exposure to 150,000-mile equivalent biodiesel ash and thermal aging. However, exposure to 435,000-mile equivalent aging resulted in a 69% decrease in thermal shock resistance. A decrease in DOC activity was seen after exposure to 150,000-mile equivalent aging, resulting in higher hydrocarbon slip and a reduction in NO2 formation. The SCR catalyst experienced a slight loss in activity after exposure to 435,000-mile equivalent aging. The SCR catalyst, placed downstream of the DPF and exposed to B20 exhaust suffered a 5% reduction in overall NOx conversion activity over the HDDT test cycle. It is estimated that the additional ash from 150,000 miles of biodiesel use would also result in a moderate increases in exhaust backpressure for a DPF. The results of this study suggest that long-term operation with B20 at the current specification limits for alkali and alkaline earth metal impurities will adversely impact the performance of DOC, DPF and SCR systems.

Williams, A.; McCormick, R.; Luecke, J.; Brezny, R.; Geisselmann, A.; Voss, K.; Hallstrom, K.; Leustek, M.; Parsons, J.; Abi-Akar, H.

2011-04-01T23:59:59.000Z

79

Approved Chemist Application 2012  

Science Conference Proceedings (OSTI)

APPROVED CHEMIST APPLICATION 1. Name of Applicant 2. Company 3. Address 4. Analyst Number (2011) 5. City 6. State 7. Postal Code

80

2010 Approved Chemist Form  

Science Conference Proceedings (OSTI)

APPROVED CHEMIST APPLICATION to the AOCS Examination Board 1. Name of Applicant 2. Company 3. Address 4. Analyst Number 5. City 6. State 7. P

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

2011 Approved Chemist Form  

Science Conference Proceedings (OSTI)

APPROVED CHEMIST APPLICATION to the AOCS Examination Board 1. Name of Applicant 2. Company 3. Address 4. Analyst Number 5. City 6. State 7. P

82

Comparison between an SCR and a vacuum interrupter system for repetitive opening  

DOE Green Energy (OSTI)

Two conceptual systems are analyzed for repetitive interruption of current from an inductive energy storage source. The interruption level for both systems is 25 kA at 25 kV. Factors such as interruption frequency, power dissipation, reliability, maintenance, developmental time, and cost are compared. The vacuum interrupter system is considered feasible for an interruption frequency of 25 Hz and a 10 to 20% duty cycle. The SCR system is considered feasible for an interruption frequency of up to 10 kHz.

Parsons, W.M.

1981-01-01T23:59:59.000Z

83

Thermal Durability of Cu-CHA NH3-SCR Catalysts for Diesel NOx Reduction  

SciTech Connect

Multiple catalytic functions (NOx conversion, NO and NH3 oxidation, NH3 storage) of a commercial Cu-zeolite urea/NH3-SCR catalyst were assessed in a laboratory fixed-bed flow reactor system after differing degrees of hydrothermal aging. Catalysts were characterized by using x-ray diffraction (XRD), 27Al solid state nuclear magnetic resonance (NMR) and transmission electron microscopy (TEM) / energy dispersive X-ray (EDX) spectroscopy to develop an understanding of the degradation mechanisms during catalyst aging. The catalytic reaction measurements of laboratory-aged catalysts were performed, which allows us to obtain a universal curve for predicting the degree of catalyst performance deterioration as a function of time at each aging temperature. Results show that as the aging temperature becomes higher, the zeolite structure collapses in a shorter period of time after an induction period. The decrease in SCR performance was explained by zeolite structure destruction and/or Cu agglomeration, as detected by XRD/27Al NMR and by TEM/EDX, respectively. Destruction of the zeolite structure and agglomeration of the active phase also results in a decrease in the NO/NH3 oxidation activity and the NH3 storage capacity of the catalyst. Selected laboratory aging conditions (16 h at 800oC) compare well with a 135,000 mile vehicle-aged catalyst for both performance and characterization criteria.

Schmieg, Steven J.; Oh, Se H.; Kim, Chang H.; Brown, David B.; Lee, Jong H.; Peden, Charles HF; Kim, Do Heui

2012-04-30T23:59:59.000Z

84

Urea for SCR-based NOx Control Systems and Potential Impacts to Ground Water Resources  

DOE Green Energy (OSTI)

One of the key challenges facing manufacturers of diesel engines for light- and heavy-duty vehicles is the development of technologies for controlling emissions of nitrogen oxides, In this regard, selective catalytic reduction (SCR) systems represent control technology that can potentially achieve the NOx removal efficiencies required to meet new U.S. EPA standards. SCR systems rely on a bleed stream of urea solution into exhaust gases prior to catalytic reduction. While urea's role in this emission control technology is beneficial, in that it supports reduced NOx emissions, it can also be an environmental threat to ground water quality. This would occur if it is accidentally released to soils because once in that environmental medium, urea is subsequently converted to nitrate--which is regulated under the U.S. EPA's primary drinking water standards. Unfortunately, nitrate contamination of ground waters is already a significant problem across the U.S. Historically, the primary sources of nitrate in ground waters have been septic tanks and fertilizer applications. The basic concern over nitrate contamination is the potential health effects associated with drinking water containing elevated levels of nitrate. Specifically, consumption of nitrate-contaminated water can cause a blood disorder in infants known as methemoglobinemia.

Layton, D.

2002-01-03T23:59:59.000Z

85

An Assessment of Experience with Selective Catalytic Reduction in Germany and Denmark: A Report from the EPRI / Utility SCR Mission  

Science Conference Proceedings (OSTI)

The limit on nitrogen oxides (NOx) of 0.15 lb/MBtu identified in a September 24, 1998 notice issued by the U.S. Environmental Protection Agency (EPA) could mandate selective catalytic reduction (SCR) on the majority of coal-fired generators in the 22 states designated by the EPA, as well as in the District of Columbia. Proponents of the 0.15 lb/Btu limit claim that significant experience with SCR in both Europe and Japan eliminates any uncertainty with regard to the design, installation, and operation of...

1999-01-01T23:59:59.000Z

86

Environmental Approvals (Manitoba, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

The Environmental Approvals Branch ensures that developments are regulated in a manner that protects the environment and public health, and sustains a high quality of life for present and future...

87

Status of the Development and Assessment of Advanced NOx Catalysts  

Science Conference Proceedings (OSTI)

This is an interim report summarizing the status of EPRI's advanced nitrogen oxides (NOx) reduction catalyst development efforts in 2000. Concepts for that are more effective, lower cost, and may not have the problems associated with the standard vanadium pentoxide - titanium dioxide (V2O5-TiO2) NOx selective catalytic reduction (SCR) catalysts that have been assessed under this program. The primary efforts in 2000 included further development of an ultra-high efficiency (UHE) catalyst, determining wheth...

2000-11-27T23:59:59.000Z

88

OXIDATION OF MERCURY ACROSS SCR CATALYSTS IN COAL-FIRED POWER PLANTS BURNING LOW RANK FUELS  

SciTech Connect

The objectives of this program were to measure the oxidation of mercury in flue gas across SCR catalyst in a coal-fired power plant burning low rank fuels using a slipstream reactor containing multiple commercial catalysts in parallel and to develop a greater understanding of mercury oxidation across SCR catalysts in the form of a simple model. The Electric Power Research Institute (EPRI) and Argillon GmbH provided co-funding for this program. REI used a multicatalyst slipstream reactor to determine oxidation of mercury across five commercial SCR catalysts at a power plant that burned a blend of 87% subbituminous coal and 13% bituminous coal. The chlorine content of the blend was 100 to 240 {micro}g/g on a dry basis. Mercury measurements were carried out when the catalysts were relatively new, corresponding to about 300 hours of operation and again after 2,200 hours of operation. NO{sub x}, O{sub 2} and gaseous mercury speciation at the inlet and at the outlet of each catalyst chamber were measured. In general, the catalysts all appeared capable of achieving about 90% NO{sub x} reduction at a space velocity of 3,000 hr{sup -1} when new, which is typical of full-scale installations; after 2,200 hours exposure to flue gas, some of the catalysts appeared to lose NO{sub x} activity. For the fresh commercial catalysts, oxidation of mercury was in the range of 25% to 65% at typical full-scale space velocities. A blank monolith showed no oxidation of mercury under any conditions. All catalysts showed higher mercury oxidation without ammonia, consistent with full-scale measurements. After exposure to flue gas for 2,200 hours, some of the catalysts showed reduced levels of mercury oxidation relative to the initial levels of oxidation. A model of Hg oxidation across SCRs was formulated based on full-scale data. The model took into account the effects of temperature, space velocity, catalyst type and HCl concentration in the flue gas.

Constance Senior

2004-12-31T23:59:59.000Z

89

Consol Energy Summary Report: Evaluation of Mercury Emissions from Coal-Fired Facilities With SCR and FGD Systems  

Science Conference Proceedings (OSTI)

This project was a joint effort between EPRI, the U.S. Department of Energy, Consol Energy, and a number of electric utility companies who hosted the mercury field measurements. This report summarizes mercury measurements by the Consol Energy to characterize the impact of selective catalytic reduction (SCR) on mercury speciation and removal at ten (10) coal-fired power plants.

2006-09-20T23:59:59.000Z

90

Impact of Biodiesel Impurities on the Performance and Durability of DOC, DPF and SCR Technologies  

SciTech Connect

It is estimated that operating continuously on a B20 fuel containing the current allowable ASTM specification limits for metal impurities in biodiesel could result in a doubling of ash exposure relative to lube-oil derived ash. The purpose of this study was to determine if a fuel containing metals at the ASTM limits could cause adverse impacts on the performance and durability of diesel emission control systems. An accelerated durability test method was developed to determine the potential impact of these biodiesel impurities. The test program included engine testing with multiple DPF substrate types as well as DOC and SCR catalysts. The results showed no significant degradation in the thermo-mechanical properties of cordierite, aluminum titanate, or silicon carbide DPFs after exposure to 150,000 mile equivalent biodiesel ash and thermal aging. However, exposure of a cordierite DPF to 435,000 mile equivalent aging resulted in a 69% decrease in the thermal shock resistance parameter. It is estimated that the additional ash from 150,000 miles of biodiesel use would also result in a moderate increases in exhaust backpressure for a DPF. A decrease in DOC activity was seen after exposure to 150,000 mile equivalent aging, resulting in higher HC slip and a reduction in NO{sub 2} formation. The metal-zeolite SCR catalyst experienced a slight loss in activity after exposure to 435,000 mile equivalent aging. This catalyst, placed downstream of the DPF, showed a 5% reduction in overall NOx conversion activity over the HDDT test cycle.

Williams, A.; McCormick, R.; Luecke, J.; Brezny, R.; Geisselmann, A.; Voss, K.; Hallstrom, K.; Leustek, M.; Parsons, J.; Abi-Akar, H.

2011-06-01T23:59:59.000Z

91

User_ApproveTrainingRequest  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approving User Training Requests Approving User Training Requests © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Approving User Training Requests Purpose The purpose of this job aid is to guide users through the step-by-step process of approving a user training request. Task A. Approve a User Training Request From the Home Page, click the You have pending approval requests link in the Alerts box. The Pending Reviews and Approvals page displays and defaults open to the pending approval. Click the expand icon ( ) next to the user's name and/or click the Title link for additional information on the request. Select the Enter Reasons for Approvals or Denials checkbox to allow for comments. Select the Approve radio

92

Approved DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

approved-doe-technical-standards Forrestal Building approved-doe-technical-standards Forrestal Building 1000 Independence Avenue, SW Washington, DC 205851.800.dial.DOE en DOE-STD-1150-2013 http://energy.gov/hss/downloads/doe-std-1150-2013 DOE-STD-1150-2013

93

Mercury Measurements Characterizing the Impact of SCR on Mercury: Consol Test Site 10---Eastern-Bituminous Coal-Fired Power Plant w ith an SCR, ESP and Wet FGD  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP) - wet flue gas desulfurization (FGD) combination or a spray dyer absorber fabric filter (SDA-FF) combination. In this program CONSOL is to determine mercury speciation and removal at 10 coal-fired faci...

2005-11-28T23:59:59.000Z

94

Mercury Measurements Characterizing the Impact of SCR on Mercury: Consol Test Site 3 - Eastern Bituminous Coal-Fired Power Plant Wit h an SCR, ESP, and Wet FGD; Impact of Chloride Addition  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., Research & Development (CONSOL), with support from the U.S. Department of Energy, National Energy Technology Laboratory (DOE) and the Electric Power Research Institute (EPRI), is evaluating the effects of selective catalytic reduction (SCR) on mercury (Hg) capture in coal-fired plants equipped with an electrostatic precipitator (ESP) - wet flue gas desulfurization (FGD) combination or a spray dyer absorber - fabric filter (SDA-FF) combination. In this program CONSOL is determining mer...

2006-04-26T23:59:59.000Z

95

Reviewed and Approved By  

E-Print Network (OSTI)

We wish to acknowledge the participation and assistance of the dry cleaning industry and allied trade representatives, district and State agency staff, and others. We thank the many dry cleaners who have taken the time to show us their operations, participate in meetings, and respond to our requests for information. We wish to express a special appreciation to the dry cleaners who reviewed this document and provided constructive comments. Disclaimer This curriculum has been reviewed by the staff of the California Air Resources Board and approved for publication. Approval does not signify that the contents necessarily reflect the views and polices of the Air Resources Board, nor does mention of trade names or commercial products constitute endorsement or recommendation for use. [Blank Page] TABLE OF CONTENTS Chapter Page Information for Instructors

Tina Najjar; Mark Williams; Richard Boyd; Victor Douglas; Kelly Hughes; Todd S. Wong

1996-01-01T23:59:59.000Z

96

EU approves food labeling rules  

Science Conference Proceedings (OSTI)

New food-labeling regulations are in place in the European Union after the European Parliament (EP) approved rules aimed at helping consumers make better informed, healthier [sic] choices. EU approves food labeling rules Inform Magazine Inform Archives

97

Staff Analysis of Proposed Installation of Two New Selective Catalytic Reduction (SCR) Units on the Projects Two Auxiliary  

E-Print Network (OSTI)

The modification(s) proposed in the petition would install two new Selective Catalytic Reduction (SCR) units on the projects two auxiliary boilers. The addition of a SCR system on each boiler would allow the project to comply with recent changes to the Bay Area Air Quality Management District regulations for emissions of nitrogen oxides (NOx) for auxiliary boilers. The Bay Area Air Quality Management District has determined that the project proposal would result in new permit to operate requirements from the district. The Gilroy Cogeneration Project is a 115-megawatt, natural gas-fired power plant located in the City of Gilroy in Santa Clara County. The project was certified by the

Edmund G. Brown

2013-01-01T23:59:59.000Z

98

Determination of Trace Element Concentrations at an Eastern Bituminous Coal Plant Employing an SCR and Wet FGD  

Science Conference Proceedings (OSTI)

Previous sampling has shown that air pollution control devices can have a significant impact on mercury and other trace elements. For example, selective catalytic reduction (SCR) can substantially increase the percentage of oxidized mercury that can then be removed by a wet flue gas desulfurization (FGD) system. The electrostatic precipitator (ESP) also readily captures most of the trace elements of interest. The emission of these trace elements is then directly related to the overall particulate collect...

2008-08-12T23:59:59.000Z

99

Development of Nitric Oxide Oxidation Catalysts for the Fast SCR Reaction  

Science Conference Proceedings (OSTI)

This study was undertaken in order to assess the potential for oxidizing NO to NO{sub 2} in flue gas environments, with the aim of promoting the so-called fast SCR reaction. In principle this can result in improved SCR kinetics and reduced SCR catalyst volumes. Prior to commencing experimental work, a literature study was undertaken to identify candidate catalysts for screening. Selection criteria comprised (1) proven (or likely) activity for NO oxidation, (2) low activity for SO2 oxidation (where data were available), and (3) inexpensive component materials. Catalysts identified included supported base metal oxides, supported and unsupported mixed metal oxides, and metal ion exchanged ZSM-5 (Fe, Co, Cu). For comparison purposes, several low loaded Pt catalysts (0.5 wt% Pt) were also included in the study. Screening experiments were conducted using a synthetic feed gas representative of flue gas from coal-fired utility boilers: [NO] = 250 ppm, [SO{sub 2}] = 0 or 2800 ppm, [H{sub 2}O] = 7%, [CO{sub 2}] = 12%, [O{sub 2}] = 3.5%, balance = N{sub 2}; T = 275-375 C. Studies conducted in the absence of SO{sub 2} revealed a number of supported and unsupported metal oxides to be extremely active for NO oxidation to NO{sub 2}. These included known catalysts (Co{sub 3}O{sub 4}/SiO{sub 2}, FeMnO{sub 3}, Cr{sub 2}O{sub 3}/TiO{sub 2}), as well as a new one identified in this work, CrFeO{sub x}/SiO{sub 2}. However, in the presence of SO{sub 2}, all the catalysts tested were found to be severely deactivated with respect to NO oxidation. Of these, Co{sub 3}O{sub 4}/SiO{sub 2}, Pt/ZSM-5 and Pt/CeO{sub 2} showed the highest activity for NO oxidation in the presence of SO{sub 2} (based on peak NO conversions to NO{sub 2}), although in no cases did the NO conversion exceed 7%. Reactor studies indicate there are two components to SO{sub 2}-induced deactivation of Co{sub 3}O{sub 4}/SiO{sub 2}, corresponding to an irreversible deactivation due to sulfation of the surface of the Co{sub 3}O{sub 4} phase, together with a reversible inhibition due to competitive adsorption of SO{sub 2} with NO on the catalyst. In an effort to minimize the deactivating effect of SO{sub 2} on Co{sub 3}O{sub 4}/SiO{sub 2}, two synthetic approaches were briefly examined. These consisted of (1) the incorporation of highly dispersed Co(II) ions in silica, as a non-sulfating matrix, via the sol-gel preparation of CoO-SiO{sub 2}; and (2) the sol-gel preparation of a mixed metal oxide, CoO-Nb{sub 2}O{sub 5}-SiO{sub 2}, with the aim of exploiting the acidity of the niobium oxide to minimize SO2 adsorption. While both catalysts showed almost no activity for NO oxidation in the absence of SO{sub 2}, when SO{sub 2} was present low activity was observed, indicating that SO{sub 2} acts as a promoter for NO oxidation over these materials. The kinetics of NO oxidation over Co{sub 3}O{sub 4}/SiO{sub 2}, Pt/SiO{sub 2} and Pt/CeO{sub 2} were also examined. Co{sub 3}O{sub 4}/SiO{sub 2} was found to exhibit a higher apparent activation energy for NO oxidation than the Pt catalysts, while the combined reaction order in NO and O{sub 2} for the three catalysts was very close to one. CO{sub 2} was found to have no effect on the kinetics of NO oxidation over these catalysts. The presence of H{sub 2}O caused a decrease in NO conversion for both Co{sub 3}O{sub 4}/SiO{sub 2} and Pt/CeO{sub 2} catalysts, while no effect was observed for Pt/SiO{sub 2}. The inhibiting effect of water was reversible and is attributed to competitive adsorption with the reactants. In sum, this study has shown that a variety of base metal catalysts are very active for NO oxidation. However, all of the catalysts studied are strongly deactivated in the presence of 2800 ppm SO{sub 2} at typical flue gas temperatures; consequently improving catalyst resistance to SO{sub x} will be a pre-requisite if the fast SCR concept is to be applied to coal-fired flue gas conditions.

Mark Crocker

2005-09-30T23:59:59.000Z

100

Help:Approve Page | Open Energy Information  

Open Energy Info (EERE)

link for the approved revision; the approved revision's row will also have a star next to it. Clicking "approve" for any other revision will re-set the approval to that...

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

OXIDATION OF MERCURY ACROSS SCR CATALYSTS IN COAL-FIRED POWER PLANTS BURNING LOW RANK FUELS  

SciTech Connect

This is the third Quarterly Technical Report for DOE Cooperative Agreement No: DE-FC26-03NT41728. The objective of this program is to measure the oxidation of mercury in flue gas across SCR catalyst in a coal-fired power plant burning low rank fuels using a slipstream reactor containing multiple commercial catalysts in parallel. The Electric Power Research Institute (EPRI) and Argillon GmbH are providing co-funding for this program. This program contains multiple tasks and good progress is being made on all fronts. During this quarter, the second set of mercury measurements was made after the catalysts had been exposed to flue gas for about 2,000 hours. There was good agreement between the Ontario Hydro measurements and the SCEM measurements. Carbon trap measurements of total mercury agreed fairly well with the SCEM. There did appear to be some loss of mercury in the sampling system toward the end of the sampling campaign. NO{sub x} reductions across the catalysts ranged from 60% to 88%. Loss of total mercury across the commercial catalysts was not observed, as it had been in the March/April test series. It is not clear whether this was due to aging of the catalyst or to changes in the sampling system made between March/April and August. In the presence of ammonia, the blank monolith showed no oxidation. Two of the commercial catalysts showed mercury oxidation that was comparable to that in the March/April series. The other three commercial catalysts showed a decrease in mercury oxidation relative to the March/April series. Oxidation of mercury increased without ammonia present. Transient experiments showed that when ammonia was turned on, mercury appeared to desorb from the catalyst, suggesting displacement of adsorbed mercury by the ammonia.

Constance Senior; Temi Linjewile

2003-10-31T23:59:59.000Z

102

State of Ohio Approval Policy  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

STATE OF OHIO STATE OF OHIO DIVISION OF STATE FIRE MARSHAL E 85 DISPENSER UTILIZATION APPROVAL POLICY When the Division of State Fire Marshal is involved in the approval process for a flammable/combustible liquid dispensing facility that utilizes E-blend, where a listed dispensing device is required by the state fire code and the proposed dispensing device is not specifically listed for the intended application, the following guidelines shall be followed in the approval process: As there are currently no approved dispensers, as tested and listed by Underwriters Laboratory or other approved authoritative source set forth in OAC 1301:7-7- 01(O)(2), OFC 115.2 , that can be used for the dispensing of E-blend fuels in Ohio in accordance with the existing and as filed revisions to the Ohio Fire Code, the

103

Formaldehyde and VOC Emissions from a Siemens-Westinghouse 501F Combustion Turbine with Lean Pre-Mix Combustors and SCR and CO Catalysts  

Science Conference Proceedings (OSTI)

This report presents a summary of flue gas formaldehyde and volatile organic compounds (VOCs) measurements conducted at a Siemens-Westinghouse 501F gas-fired combustion turbine with lean pre-mix low-NOx combustors and selective catalytic reduction (SCR) and carbon monoxide (CO) catalysts.

2004-01-30T23:59:59.000Z

104

Formaldehyde Emissions from a Siemens-Westinghouse 501F Combustion Turbine with Pre-Mix Combustors, with SCR and CO Catalysts  

Science Conference Proceedings (OSTI)

This interim report presents a summary of formaldehyde emission measurements conducted at full operating load from a Siemens-Westinghouse 501F gas-fired combustion turbine with lean pre-mix low-NOx combustors, and selective catalytic reduction (SCR) and carbon monoxide (CO) catalysts.

2003-02-26T23:59:59.000Z

105

Program on Technology Innovation: Bench-Scale Evaluation of an Ammonia Slip Destruction Catalyst at Intermediate and Post SCR Reacto r Conditions  

Science Conference Proceedings (OSTI)

Reducing ammonia slip from selective catalytic reduction (SCR) systems may allow unit operators to maintain or increase NOx removal efficiencies by increasing reagent flow rates without affecting downstream equipment or ash contamination. This research project is studying the performance of a near-commercial ammonia destruction catalyst using a gas-fired bench-scale reactor. A test program was designed to evaluate the catalyst at different NH3 to NOx ratios, flue gas temperatures, and catalyst volumes. C...

2011-06-21T23:59:59.000Z

106

WIPP_Panel_7_Approved  

NLE Websites -- All DOE Office Websites (Extended Search)

Panel 7 Certified and Ready for Waste Disposal Panel 7 Certified and Ready for Waste Disposal CARLSBAD, N.M., August 1, 2013 - In mid-July 2013, the New Mexico Environment Department (NMED) approved the use of Panel 7 for disposal of defense- related transuranic (TRU) waste at the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP). Approval by NMED for each underground waste disposal panel prior to use is required under the WIPP Hazardous Waste Facility Permit (Permit). A panel consists of seven waste disposal rooms and each room is approximately 13 feet high, 33 feet wide and 300 feet long. Mining and outfitting, which includes installation of electricity, monitoring equipment and air regulating bulkheads, of a panel takes about two to two and a half years. Once the mining and outfitting are completed,

107

FY11 Approved LDRD Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Approved LDRD Projects Approved LDRD Projects 2011 Projects Page 1 LDRD Proj. No. Project Title P.I. Dept./Bldg. Directorate 08-002 Strongly Correlated Systems: From Graphene to Quark-Gluon Plasma Kharzeev, D. & Tsvelik, A. PHYS/CMP NPP/BES 08-028 Genomic DNA Methylation: The Epigenetic Response of Arabidopsis Thaliana Genome to Long-term Elevated Atmospheric Temperature and CO 2 in Global Warming Liu, Q. MED/490 & BIO/463 ELS 09-001 Nanoscale Anode Materials for Lithium Batteries Graetz, J. ES&T/ERD GARS 09-002 Bioconversion of Lignocellulose to Ethanol and Butanol Facilitated by Ionic Liquid Preprocessing Francis, A. J./Wishart, J.F./Dunn, J. ES/Chem./Biol ogy ELS 09-003 Organic Photovoltaics: Nanostructure, Solvent Annealing and Performance Ocko, B. PM/510B BES 09-004 Surface Chemisty and

108

APPROVAL TO CONTINUE SPONSORSHIP OF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competition Competition APPROVAL TO CONTINUE SPONSORSHIP OF THE_[insert the name of the laboratory/site/facility]___ AS A FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER The _[insert the name of the laboratory/site/facility]_ is a Department of Energy (DOE) Federally Funded Research and Development Center (FFRDC) managed and operated by _[insert the name of the contractor]_ under DOE Contract _[insert contract number]_. The current contract, which serves as the sponsoring agreement, expires [insert date]. _[insert one or two sentences briefly describing the laboratory/site/facility mission]_. Federal Acquisition Regulation (FAR) 35.017-4 provides for the Head of the sponsoring Agency to approve the continuance of the sponsorship of the FFRDC.

109

FY12 Approved LDRD Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Approved LDRD Projects 2 Approved LDRD Projects 2012 Projects Page 1 LDRD Proj. No. Project Title P.I. Dept./Bldg. Directorate 09-001 Nanoscale Anode Materials for Lithium Batteries Graetz, J. ST/815 GARS 09-003 Organic Photovoltaics: Nanostructure, Solvent Annealing and Performance Ocko, B. PM/510B BES 10-006 Solar Energy Source Evaluation for Smart Grid Development Yue, Meng ES&T/130 GARS 10-007 High Throughput Quantitative Biochemical Phenotyping Rogers, Alistair ES/EE ELS 10-010 Development of an Ultrafast Electron Diffraction Facility for Condensed Matter Physics Challenges Hill, J. CMP/510B BES 10-012 Design of Pt-free Electrocatalysts for Fuel Cell Oxygen Reduction Reactions Khalifah, P. Chemistry/555 BES 10-014 Charge Generation and Transport in Films of Conjugated Polymers for Organic Photovoltaics BNL Part of a

110

Live Status  

NLE Websites -- All DOE Office Websites (Extended Search)

For Users For Users Live Status Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612

111

Experimental Studies for CPF and SCR Model, Control System, and OBD Development for Engines Using Diesel and Biodiesel Fuels  

SciTech Connect

The research carried out on this project developed experimentally validated Diesel Oxidation Catalyst (DOC), Diesel Particulate Filter (DPF), and Selective Catalytic Reduction (SCR) high?fidelity models that served as the basis for the reduced order models used for internal state estimation. The high?fidelity and reduced order/estimator codes were evaluated by the industrial partners with feedback to MTU that improved the codes. Ammonia, particulate matter (PM) mass retained, PM concentration, and NOX sensors were evaluated and used in conjunction with the estimator codes. The data collected from PM experiments were used to develop the PM kinetics using the high?fidelity DPF code for both NO2 assisted oxidation and thermal oxidation for Ultra Low Sulfur Fuel (ULSF), and B10 and B20 biodiesel fuels. Nine SAE papers were presented and this technology transfer process should provide the basis for industry to improve the OBD and control of urea injection and fuel injection for active regeneration of the PM in the DPF using the computational techniques developed. This knowledge will provide industry the ability to reduce the emissions and fuel consumption from vehicles in the field. Four MS and three PhD Mechanical Engineering students were supported on this project and their thesis research provided them with expertise in experimental, modeling, and controls in aftertreatment systems.

Johnson, John; Naber, Jeffrey; Parker, Gordon; Yang, Song-Lin; Stevens, Andrews; Pihl, Josh

2013-04-30T23:59:59.000Z

112

REQUEST FOR APPROVAL OF OUTSIDE EMPLOYMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPROVAL OF OUTSIDE EMPLOYMENT APPROVAL OF OUTSIDE EMPLOYMENT TO: Name of supervisor Title and Routing Symbol and Deputy Assistant General Counsel for Standards of Conduct (GC-77) or Chief Counsel for Local Site FROM: Name and Title DATE: I request approval to engage in outside employment as described below: 1. Name of prospective employer 2.

113

Live Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov

114

Science Gateway Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status...

115

On Line Beamline Commissioning Activity Approval Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Activity Approval Form Commissioning Activity Approval Form This form is to be filled by the Commissioning Activity Team Leader. No beamline commissioning activities will be allowed to run without a properly completed, approved, and posting of this commissioning approval form. You will be notified by e-mail upon approval. Sector Beamline Expected Start Date Expected Duration 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 BM ID ( Give a Unit) Activity Description( Give only a brief description) Commissioning Team Members First and Last Name Affiliation Phone Number 1. 2. 3. 4. 5. 6. Special Safety Concerns Commissioning Activity Team Leader Name E-Mail Address Submit Commissioning Activity Approval Form Clear all Fields and start All over again!!!

116

Security Council Approval of Kofi  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Week Ending Friday, December 20, 1996 Statement on the United Nations Security Council Approval of Kofi Annan as Secretary-General December 13, 1996 I'm delighted by today's vote in the United Nations Security Council, selecting Kofi Annan of Ghana to be the new U.N. Sec- retary-General. We are hopeful that the Gen- eral Assembly will concur with the Security Council early next week. Through his decades of work at the United Nations and in the international arena, Kofi Annan has established excellent working re- lations with many countries, including the United States. Over the last 4 years as U.N. Undersecretary for Peacekeeping, and throughout his impressive career, he has proven himself an able and energetic man- ager-professional, impartial, well-versed in

117

NNSA approves LANL workforce reduction plan  

NLE Websites -- All DOE Office Websites (Extended Search)

this spring through a voluntary separation program has been approved by the National Nuclear Security Administration, LANL Director Charlie McMillan announced today. Eligible...

118

Approved DOE Technical Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards Approved DOE Technical Standards DOE Technical Standards Program August 16, 2013 Technical Standards, DOE-HDBK-1108-2002 Change Notice 2 (July 2013)...

119

ADVOCACY GUIDING VALUES AND APPROVAL PROCESS ...  

Science Conference Proceedings (OSTI)

reviewed with the Board of Directors in order to obtain their approval before proceeding ... which it does provide advocacy and will openly communicate its...

120

SMARTS status  

NLE Websites -- All DOE Office Websites (Extended Search)

SMARTS INSTRUMENT STATUS SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2014/01/11 12:06:58) Run Number: 87401 Title: Sample1 Pretested [4.06,150.00,-0.75,45.00] Run Status: running Last Script Activity: 2014/01/11 11:52:36: Start run 87401; mah 1200000 move 4.06 150.00 -0.75 45.00 View full script Next Script Command: mah 1200000 move -0.75 120.00 -0.60 45.00 Proposal#: 4808 Sample#: 977 MAH: 837309 Monitor: 306052 Beam Current: 100 Shutter Status: OPEN Used disk space on /home: 52% Used disk space on /disk2: 74% Crate Status smartsdaq1 smartsdaq2 smartsdaq3 smartsdaq4 smartsdaq5 T0's in Run 16946 16959 16971 16984 16997 T0's Processed 16946 16959 16971 16984 16997 Events 726326 649097 794699 702610 3750460 Events/T0 42.86 38.27 46.83 41.37 220.65

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Automation Status  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

122

JGI - Approved CSP Projects, 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 For status information, see the Genome Projects section. Organism Proposer Affiliation Microbes Olavius algarvensis symbionts Why? Dubilier Max Planck Institute of Marine Microbiology Crenarchaeota Why? Delong MIT Marinobacter aquaeolei VT8 Why? Edwards Woods Hole Oceanographic Institution Staphylococcus aureus subsp. aureus JH1 and JH9 Why? Tomasz Rockefeller University Prochlorococcus ACM A12II Why? Chisholm MIT Rhodocyclus-like polyphosphate accum. Why? Hugenholtz JGI Rhodobacter sphaeroides ATCC17025 and ATCC17029 Why? Kaplan University of Texas, Houston Contaminated groundwater Why? Zhou ORNL Lactobacillus reuteri strains 100-23 and F275 Why? Tannock University of Otago, Dunedin, NZ Ignicoccus hospitalis KIN4/I Podar Diversa Bacillus cereus subsp. cytotoxis NVH 391-98 and

123

Annual Hanford Site Environmental Permitting status report  

Science Conference Proceedings (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

124

NEUP Approved Universities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEUP Approved Universities NEUP Approved Universities NEUP Approved Universities U.S. universities and colleges must apply to the U.S. Department of Energy to administer NEUP scholarships and fellowships. That is done through a separate solicitation operated by the Department of Energy's Idaho field office. If your university is not listed below, contact NEUP@inl.gov. Approved Universities Auburn University Boise State University Clemson University College of Southern Maryland Colorado School of Mines Duke University Francis Marion University Georgia Institute of Technology Idaho State University Illinois Institute of Technology Kansas State University Lakeshore Community College Linn State Technical College Massachusetts Institute of Technology Miami Dade College Missouri University of Science & Technology

125

DOE Technical Standards Program: Recently Approved DOE Technical...  

NLE Websites -- All DOE Office Websites (Extended Search)

Recently Approved DOE Technical Standards Office of Nuclear Safety This page lists DOE technical standards that have been approved and added to the distribution. If they are...

126

Energy Praises the Nuclear Regulatory Commission Approval of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the...

127

DOE Guidance-Approval Process for Dual Compensation Waivers for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approval Process for Dual Compensation Waivers for Reemployed Annuitants DOE Guidance-Approval Process for Dual Compensation Waivers for Reemployed Annuitants Guidance Memorandum...

128

Energy Department Approves Gulf Coast Exports of Liquefied Natural...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Approves Gulf Coast Exports of Liquefied Natural Gas Energy Department Approves Gulf Coast Exports of Liquefied Natural Gas May 20, 2011 - 1:00pm Addthis...

129

ISA Approves Standard for Wireless Automation in Process Control...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications On September 9, the...

130

Energy Department Approves Gulf Coast Exports of Liquefied Natural...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Approves Gulf Coast Exports of Liquefied Natural Gas Energy Department Approves Gulf Coast Exports of Liquefied Natural Gas May 20, 2011 - 12:00am Addthis...

131

Air Quality Approvals and Permits (New Brunswick, Canada) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Quality Approvals and Permits (New Brunswick, Canada) Air Quality Approvals and Permits (New Brunswick, Canada) Eligibility Commercial Construction Developer Industrial...

132

Current Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Status Current Status > Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player July 31, 1942 The Army Corp of Engineers leases 1,025 acres of the Cook County Forest Preserve to build a research facility. November 1942 Under the direction of Enrico Fermi, a group of scientists at the University of Chicago begin building Chicago Pile-1 (CP-1). Security and secracy were essential. December 2, 1942 Enrico Fermi's team creates the world's first self-sustaining nuclear chain reaction using the CP-1 reactor under Stagg Field at the University of Chicago. CP-1 1943 The experiments under Stagg Field shut down, and the scientists move to a 19 acre section of the leased forest preserve, known as Site A. CP-1 is reconstructed and modified at Site A and renamed Chicago Pile 2 (CP-2).

133

Tevatron status  

Science Conference Proceedings (OSTI)

The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

Dugan, G.

1989-03-01T23:59:59.000Z

134

An experimental investigation of the urea-water decomposition and selective catalytic reduction (SCR) of nitric oxides with urea using V2O5-WO3-TiO2 catalyst.  

E-Print Network (OSTI)

Two flow reactor studies, using an electrically heated laminar flow reactor over Vanadia based (V2O5-WO3/TiO2) honeycomb catalyst, were performed at 1 atm pressure and various temperatures. The experiments were conducted using simulated exhaust gas compositions for different exhaust gases. A quartz tube was used in order to establish inert conditions inside the reactor. The experiments utilized a Fourier transform infrared (FTIR) spectrometer in order to perform both qualitative and quantitative analysis of the reaction products. Urea-water solution decomposition was investigated over V2O5-WO3/TiO2 catalyst over the entire SCR temperature range using the temperature controlled flow reactor. The solution was preheated and then injected into pure nitrogen (N2) stream. The decomposition experiments were conducted with a number of oxygen (O2) compositions (0, 1, 10, and 15%) over the temperature range of 227oC to 477oC. The study showed ammonia (NH3), carbon-dioxide (CO2) and nitric oxide (NO) as the major products of decomposition along with other products such as nitrous oxide (N2O) and nitrogen dioxide (NO2). The selective catalytic reduction (SCR) of nitric oxide (NO) with urea-water solution over V2O5-WO3/TiO2 catalyst using a laboratory laminar-flow reactor was investigated. Urea-water solution was injected at a temperature higher than the vaporization temperature of water and the flow reactor temperature was varied from 127oC to 477oC. A FTIR spectrometer was used to determine the concentrations of the product species. The major products of SCR reduction were NH3, NO and CO2 along with the presence of other minor products NO2 and N2O. NO removal of up to 87% was observed. The aim of the urea-water decomposition experiments was to study the decomposition process as close to the SCR configuration as possible. The aim of the SCR experiments was to delineate the effect of various parameters including reaction temperature and O2 concentration on the reduction process. The SCR investigation showed that changing parameter values significantly affected the NO removal, the residual NH3 concentration, the temperature of the maximum NO reduction, and the temperature of complete NH3 conversion. In the presence of O2, the reaction temperature for maximum NO reduction was 377?C for ratio of 1.0.

Johar, Jasmeet Singh

2005-08-01T23:59:59.000Z

135

CPP Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protection Program (CPP) Protection Program (CPP) Status FY10 Jeff Mauth Project Manager May 19, 2010 1 Agenda  Sensor Integration  Sensor Deployment  CPP Portal  Mercury  Parting Comments  Questions 2 Sensor Integration Task Lead: Greg Thomas  Flo and Flower: Session Data  Snort: Network Intrusion Detection Data  AMP: Various Types of Network Data  PopQuiz: Various Types of Network Data  T3: Data Movement and Sensor Control 3 Sensor Deployment Task Lead: Liz Faultersack Certification and Accreditation Continued Expansion Hardware Refresh to Begin FY11 9 CPP Portal Task lead: Brett Didier Features Sharing Policy Data and Releases 13 CPP Portal Provides DOE cyber analysts access to CPP collected "DOE enterprise" data

136

May 15, 2012, Federal Technical Capability Program Face to Face Meeting … Presentation: Status of FAQS revision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 15, 2012 May 15, 2012 Jeanette Yarrington Process * Approve FAQS at 5-Year Intervals Identify Sponsor/POC and Revise FAQS FTCP Agents/DNFSB Staff Review Receive/Resolve Comments RevCom Process as Technical Standard Submit for DNFSB Staff Review FTCP Approval/CTA Concurrence Submit to TSP for Formal Posting FTCP Approval/CTA Concurrence Qualification Standard Sponsor/POC FTCP Agent Status Chemical Processing EM/Mike Mikolanis and Patricia Suggs Mike Mikolanis Complete - Approved 02/2010 Criticality Safety Idaho/Adolf Dary Newbry Complete - Approved 04/2009 Garcia and NA- SH/Jerry Hicks Environmental Compliance NA-173/Steve Black Mike Garcia Complete - Approved 06/2011 Facility Representative HSS/Earl Hughes Pat Worthington Complete - Approved 10/2010 *JTA needed Mechanical Systems Pantex/Terry

137

Status Company Terminal Term  

NLE Websites -- All DOE Office Websites (Extended Search)

Status of Short-Term Applications to Export Previously Imported LNG (as of March 5, 2013) Status Company Terminal Term (Years) Authorized Volume (Equivalent Bcf in natural gas)...

138

Propane Market Status Report  

Gasoline and Diesel Fuel Update (EIA)

Propane Market Status Report 07272000 Click here to start Table of Contents Propane Market Status Report Propane Prices Follow Crude Oil Propane Demand by Sector Demand Impacted...

139

Mercury oxidation over the V{sub 2}O{sub 5}(WO{sub 3})/TiO{sub 2} commercial SCR catalyst  

SciTech Connect

Mercury oxidation by hydrochloric acid over the V{sub 2}O{sub 5}(WO{sub 3})/TiO{sub 2} commercial SCR catalyst was investigated. Both fresh and aged catalysts with honeycomb structure, which were exposed to a coal combustion flue gas in a coal-fired boiler for over 71 000 h. were examined. The aged catalysts were characterized by X-ray and SEM-EDX analysis to examine the presence of ash deposition on the surface. The mercury oxidation rate was enhanced by increasing HCl concentrations and inhibited strongly by the presence of NH{sub 3}. This behavior could be explained by a kinetic model assuming that HCl competes for the catalyst active sites against NH{sub 3}. As the catalyst operation time increased, the mercury oxidation rate was observed to decrease considerably in the presence of NH{sub 3} while NO reduction rate was apparently nearly unchanged. By examining aged catalysts, deposits stemming from fly ash and SO{sub 2}/SO{sub 3} were observed to accumulate continuously on the catalyst surface. The ash deposited on the surface may partially block the active catalyst sites and decrease their number. The decrease of the number of active sites on the catalyst surface caused NH{sub 3} to remain unreacted in the honeycomb catalyst. The decrease of the Hg{sup 0} oxidation rate was caused by the inhibition effect of NH{sub 3} remaining in the catalyst.

Kamata, H.; Ueno, S.; Naito, T.; Yukimura, A [IHI Corp, Kanagawa (Japan)

2008-11-15T23:59:59.000Z

140

Form Approval: OMB No. 1905-0129  

U.S. Energy Information Administration (EIA) Indexed Site

Due Date: 2013 Due Date: 2013 Form Approval: OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden hours: 0.75 SCHEDULE 1. IDENTIFICATION Contact Information Form EIA-861S ANNUAL ELECTRIC POWER INDUSTRY REPORT (Short Form) NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data protections see the provisions on sanctions and the provisions concerning the confidentiality of information in the instructions. Title 18 U.S.C. 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction. Entities that report using the Form EIA-861 do

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE Approved Technical Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards Program » DOE DOE Technical Standards Program » DOE Approved Technical Standards DOE Approved Technical Standards Document ID Filter Document ID sort ascending Title Date DOE-STD-7501-99 The DOE Corporate Lessons Learned Programs Superseding DOE-STD-7501-95 Including Change Notice No. 1 (September 1997) This technical standard provides management expectations and a framework for the DOE Corporate Lessons Learned Program. The framework is intended to support development and implementation of a DOE-wide lessons learned infrastructure 01/20/2000 DOE-STD-6005-01 Industrial Hygiene Practices This standard recommends industrial hygiene practices to support components of the Worker Protection Program required by Department of Energy (DOE) Order 440.1A, “Worker Protection Management for DOE Federal and Contractor Employees. 04/30/2001

142

Approval of the Critical Decision 4.  

Office of Legacy Management (LM)

SUBJECT: ACTION: Approval of the Critical Decision 4 for the Closeout SUBJECT: ACTION: Approval of the Critical Decision 4 for the Closeout of the General Atomics (GA) Hot Cell Facility (HCF) Decontamination and Decommissioning (D&D) Project, Project Baseline Summary VL-GA-0012, and the Transfer for the GA Project Files to the Office of Legacy Management (LM) ISSUE: None BACKGROUND: Activities associated with the cleanup of the GA HCF and surrounding site were completed on September 28,2003. The GA site has been remediated to negotiated cleanup standards and released by the U. S. Nuclear Regulatory Commission (NRC) and the State of California Department of Health Services Radiological Health Branch (CAL-RHB) to unrestricted use. All project generated waste and legacy spent fuel materials have been dispositioned. GAts Special Nuclear

143

DOE Approved Technical Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Center » DOE Technical Standards Program » DOE Information Center » DOE Technical Standards Program » DOE Approved Technical Standards DOE Approved Technical Standards Document ID Filter Document ID sort descending Title Date DOE-HDBK-1001-96 Guide to Good Practices for Training and Qualification of Instructors This guide contains good practices for the training and qualification of technical instructors and instructional technologist at DOE reactor and non-reactor nuclear facilities. 05/15/1996 DOE-HDBK-1002-96 Guide to Good Practices for Training and Qualification of Chemical Operators The purpose of the Guide to Good Practices for Training and Qualification of Chemical Operators is to provide contractor training organizations with information that can be used as a reference to refine existing chemical operator training programs, or develop new training programs where no program exists. 05/14/1996

144

Nevada geothermal power plant project approved  

Science Conference Proceedings (OSTI)

A proposal to construct and test a 12.5-megawatt geothermal power plant in the Steamboat Hot Springs KGRA in Washoe County, Nevada, has been approved by the Bureau of Land Management (BLM). The power plant could be completed by October 1987. Several stipulations are included in the BLM approval. The stipulations include a program to monitor ground water, surface water, and hydrothermal features to detect any impacts on the hydrology in the Steamboat Hot Springs area. When plant operations are tested, an emission test will be required to verify that noncondensible gas concentrations are within federal and state standards. No geothermal fluid will be discharged on the land's surface. Other stipulations include the special construction of electrical distribution lines to protect birds of prey; the fencing of hazardous areas; and a minimal disturbance of surface areas.

Not Available

1987-07-01T23:59:59.000Z

145

Critical Decision 4 (CD-4) Approval Template | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 (CD-4) Approval Template Critical Decision 4 (CD-4) Approval Template ExampleCD-4Template02-14-12.docx More Documents & Publications Critical Decision 2 (CD-2...

146

Critical Decision 2 (CD-2) Approval Template | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 (CD-2) Approval Template Critical Decision 2 (CD-2) Approval Template ExampleCD-2Template02-14-12.docx More Documents & Publications Critical Decision 4 (CD-4...

147

Process development status report for advanced manufacturing projects  

Science Conference Proceedings (OSTI)

This is the final status report for the approved Advanced Manufacturing Projects for FY 1989. Five of the projects were begun in FY 1987, one in FY 1988, and one in FY 1989. The approved projects cover technology areas in welding, explosive material processing and evaluation, ion implantation, and automated manufacturing. It is expected that the successful completion of these projects well result in improved quality and/or reduced cost for components produced by Mound. Those projects not brought to completion will be continued under Process development in FY 1990.

Brinkman, J.R.; Homan, D.A.

1990-03-30T23:59:59.000Z

148

ISA Approves Standard for Wireless Automation in Process Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISA Approves Standard for Wireless Automation in Process Control ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications On September 9, the Standards and Practices Board of the International Society for Automation (ISA) approved the ISA-100.11a wireless standard, "Wireless Systems for Industrial Automation: Process Control and Related Applications," making it an official ISA standard. ISA Approves Standard for Wireless Automation in Process Control Applications More Documents & Publications DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Control Systems Security Standards: Accomplishments And Impacts

149

Renewable Energy Approvals (Ontario, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Approvals (Ontario, Canada) Renewable Energy Approvals (Ontario, Canada) Renewable Energy Approvals (Ontario, Canada) < Back Eligibility Agricultural Developer Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Buying & Making Electricity Solar Wind Program Info State Ontario Program Type Siting and Permitting Provider Ontario Ministry of the Environment The Renewable Energy Approvals (REA) regulation creates an approval and review process for all biomass, wind energy, and solar facilities. The Ministry of the Environment inspects, investigates and enforces province-wide to ensure businesses and individuals in Ontario comply with environmental legislation outlined in the Ontario Environmental Protection Act. The regulation outlines siting regulations for all projects.

150

DOE Approved Technical Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards Program » DOE DOE Technical Standards Program » DOE Approved Technical Standards DOE Approved Technical Standards Document ID Filter Document ID Title Date sort descending DOE-HDBK-1010-92 DOE Fundamentals Handbook, Classical Physics Reaffirmed 1999 The handbook includes information on the units used to measure physical properties; vectors, and how they are used to show the net effect of various forces; Newton's Laws of motion, and how to use these laws in force and motion applications; and the concepts of energy, work, and power, and how to measure and calculate the energy involved in various applications 09/27/1995 DOE-HDBK-1078-94 Training Program Handbook: A Systematic Approach to Training Reaffirmed 1999 | Supercedes DOE-STD-0102T, TAP-2 This Handbook contains a narrative discussion on the various phases of the systematic approach to training process. The phases can be modified and incorporated as appropriate when developing detailed local procedures. Each phase is organized such that the major steps necessary to adequately complete it are clear. 10/25/1995

151

Plant Operational Status - Pantex Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Plant Operational Status Page Content Operational Status Shift 1 - Day The Pantex Plant is open for normal operations. All personnel are to report for duty according to...

152

July 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - anticipated completion no later than September, assuming timely OMB review and approval. 2. Draft PF Working Group charter final review by senior management to be

153

Status of the NRC Decommissioning Program  

Science Conference Proceedings (OSTI)

On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

2003-02-24T23:59:59.000Z

154

Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase  

Open Energy Info (EERE)

Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Abstract N/A Author U.S. Geothermal Inc. Published Publisher Not Provided, 2010 Report Number N/A DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Citation U.S. Geothermal Inc.. 2010. Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement. Boise Idaho: (!) . Report No.: N/A. Retrieved from "http://en.openei.org/w/index.php?title=Idaho_Public_Utilities_Commission_Approves_Neal_Hot_Springs_Power_Purchase_Agreement&oldid=682748"

155

Approving and Issuing DOE Technical Standards, TSPP-6  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-2013 6-2013 DOE TECHNICAL STANDARDS September 2013 PROGRAM PROCEDURES APPROVING AND ISSUING DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Washington, D.C. 2058 DOE-TSPP-6-2013 Approving and Issuing September 2013 DOE Technical Standards Program CONTENTS 1. SCOPE ............................................................................................................................................ 1 1.1 Purpose .......................................................................................................................1 1.2 Applicability .................................................................................................................1 2. APPROVING AND ISSUING DOE TECHNICAL STANDARDS ................................................... 1

156

Selective catalytic reduction (SCR) of nitric oxide (NO) with ammonia over vanadia-based and pillared interlayer clay-based catalysts  

E-Print Network (OSTI)

The selective catalytic reduction (SCR) of nitric oxide (NO) with ammonia over vanadia-based (V2O5-WO3/TiO2) and pillared interlayer clay-based (V2O5/Ti-PILC) monolithic honeycomb catalysts using a laboratory laminar-flow reactor was investigated. The experiments used a number of gas compositions to simulate different combustion gases. A Fourier transform infrared (FTIR) spectrometer was used to determine the concentrations of the product species. The major products were nitric oxide (NO), ammonia (NH3), nitrous oxide (N2O), and nitrogen dioxide (NO2). The aim was to delineate the effect of various parameters including reaction temperature, oxygen concentration, NH3-to-NO ratio, space velocity, heating area, catalyst arrangement, and vanadium coating on the removal of nitric oxide. The investigation showed that the change of the parameters significantly affected the removals of NO and NH3 species, the residual NH3 concentration (or NH3 slip), the temperature of the maximum NO reduction, and the temperature of complete NH3 conversion. The reaction temperature was increased from the ambient temperature (25C) to 450 C. For both catalysts, high NO and NH3 removals were obtained in the presence of a small amount of oxygen, but no significant influence was observed from 0.1 to 3.0% O2. An increase in NH3-to-NO ratio increased NO reduction but decreased NH3 conversions. For V2O5-WO3/TiO2, the decrease of space velocity increased NO and NH3 removals and broadened the active temperature window (based on NO > 88% and NH3 > 87%) about 50C. An increase in heating area decreased the reaction temperature of the maximum NO reduction from 350 to 300C, and caused the active reaction temperature window (between 250 and 400C) to shift toward 50C lower reaction temperatures (between 200 and 350C). The change of catalyst arrangements resulted slight improvement for NO and NH3 removals, therefore, the change might contribute to more gas removals. The catalyst with extra vanadium coating showed higher NO reductions and NH3 conversions than the catalyst without the extra vanadium coating.

Oh, Hyuk Jin

2006-05-01T23:59:59.000Z

157

APS Experiment Safety Approval System Instructions for Users  

NLE Websites -- All DOE Office Websites (Extended Search)

form and Experiment Hazard Control Plan? Part VII: What If... APS Experiment Safety Approval System Instructions for Users version 2.0 January 21, 2005 Contacts...

158

Professional Preface, 4 (1): TMS Approves Five Chapters as Joint ...  

Science Conference Proceedings (OSTI)

At the October 9, 1996, meeting of the TMS Board of Directors, five student chapters were approved as Joint ASM/TMS Student Chapters. They are: University of...

159

President Roosevelt Approves Production of Atomic Bomb | National...  

National Nuclear Security Administration (NNSA)

Approves Production of Atomic Bomb | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency...

160

Approval Process for Dual Compensation Waivers for Reemployed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DIRECTOR OFFICE 0 UMAN CAPITAL MANAGEMENT SUBJECT: POLICY MEMORANDUM 11: APPROVAL PROCESS FOR DUAL COMPENSATION WAIVERS FOR REEMPLOYED ANNUITANTS Section 1122 of the National...

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Idaho Public Utilities Commission Approves Neal Hot Springs Power...  

Open Energy Info (EERE)

Number NA DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase...

162

Approval for Use of the Minnesota Multiphasic Personality Inventory...  

NLE Websites -- All DOE Office Websites (Extended Search)

OF HEAL TH, SAFETY AND SECURITY Approval for Use of Minnesota Multiphasic Personality Inventory-2 Revised Format and Psychological Assessment Inventory Under title IO, Code of...

163

Review and Approval of Nuclear Facility Safety Basis Documents...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

institutional programs in Integrated Safety Management System documents and site-wide manuals was added. p. 13 Sect. 3 Approval Bases for Technical Safety Requirements New...

164

GC-12_Reorg_Approval.pdf | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response to several FOIA requests - Renewable Energy. DOEContractorWorkForceRestructuringApprovalThresholds.pdf Federal Regulations for Natural Gas Imports and Exports...

165

Heuristic status polling  

DOE Patents (OSTI)

Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

2011-06-07T23:59:59.000Z

166

Microsoft Word - scr-form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Use attachment if necessary.) Lifecycle Stage Est. Time Act. Time Date Comp. Remarks AnalysisDesign ...

167

TEXAS A&M RESEARCH FOUNDATION EMAIL & FAX APPROVAL AUTHORIZATION  

E-Print Network (OSTI)

10-22-09 TEXAS A&M RESEARCH FOUNDATION EMAIL & FAX APPROVAL AUTHORIZATION This form serves as authorization for the Texas A&M Research Foundation to accept approvals for invoices and project payroll expenses by email or fax. I understand that by using this process the Texas A&M Research Foundation

168

TEXAS A&M RESEARCH FOUNDATION FAX & EMAIL APPROVAL AUTHORIZATION  

E-Print Network (OSTI)

TEXAS A&M RESEARCH FOUNDATION FAX & EMAIL APPROVAL AUTHORIZATION This form serves as authorization for the Texas A&M Research Foundation to accept approvals by fax or email for invoices, travel, and/or payroll expenses. I understand that by using this method, the Texas A&M Research Foundation will process payments

169

Waste Feed Delivery Environmental Permits and Approvals Plan  

Science Conference Proceedings (OSTI)

This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

TOLLEFSON, K.S.

2000-01-18T23:59:59.000Z

170

Attachment G: Guidance on Headquarters Approval of State  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

G: Guidance on Headquarters Approval of State G: Guidance on Headquarters Approval of State Agreements-in-Principle Attachment G: Guidance on Headquarters Approval of State Agreements-in-Principle Guidance on Headquarters Approval of State Agreements-in-Principle Introduction: In December 1993, the Office of Environmental Management (EM) informed states that the Department intended to extend the existing Agreements-in-Principle (AIPs) for another five-year term and would continue to negotiate new AIPs. The purpose of this memorandum is to provide guidance on Headquarters approval of State AIPs in the EM program. This guidance applies to both new and renegotiated AIPs. All Operations and Field Offices are directed to involve appropriate Headquarters organizations early in the negotiations to assure that draft agreements

171

Department of Energy Commends the Nuclear Regulatory Commission's Approval  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commends the Nuclear Regulatory Commission's Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the Nuclear Regulatory Commission's (NRC) decision to approve an Early Site Permit (ESP) for the Entergy Corporation's Grand Gulf Nuclear Station in Mississippi. This approval, the second ESP this month, demonstrates another major milestone in President Bush's Advanced Energy Initiative, which plans to expand the use of safe and clean nuclear power. Earlier this

172

APPROVAL REQUIRED WHEN EMPLOYEES ENGAGE IN OUTSIDE EMPLOYMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPROVAL REQUIRED WHEN EMPLOYEES ENGAGE IN OUTSIDE APPROVAL REQUIRED WHEN EMPLOYEES ENGAGE IN OUTSIDE EMPLOYMENT Pursuant to 5 C.F.R. §§ 2635.803 and 3301.103 (a), all Department of Energy employees, other than special Government employees, must obtain prior written approval from their immediate supervisor and an ethics counselor before engaging in outside employment regardless of whether the employee is compensated for the activity. A special Government employee is an employee serving not more than 130 days in any consecutive 365 day period. Each request for approval must include the name of the employee seeking approval, the group or organization for whom the employee seeks to work, the type of work to be performed, and the proposed dates of employment and hours to be worked. These regulations have been in place for several years.

173

Energy Department Approves Gulf Coast Exports of Liquefied Natural Gas |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approves Gulf Coast Exports of Liquefied Natural Approves Gulf Coast Exports of Liquefied Natural Gas Energy Department Approves Gulf Coast Exports of Liquefied Natural Gas May 20, 2011 - 12:00am Addthis Washington, D.C. - The U.S. Department of Energy today issued a conditional authorization approving an application to export liquefied natural gas (LNG) from the Sabine Pass LNG Terminal in Louisiana, paving the way for thousands of new construction and domestic natural gas production jobs in Louisiana, Texas, and several other states. Subject to final environmental and regulatory approval, Sabine Pass Liquefaction, LLC will retrofit an existing LNG import terminal in Louisiana so that it can also be used for exports. This is the first long-term authorization to export natural gas from the lower 48 states as LNG to all U.S. trading partners.

174

President Roosevelt Approves Production of Atomic Bomb | National Nuclear  

National Nuclear Security Administration (NNSA)

Approves Production of Atomic Bomb | National Nuclear Approves Production of Atomic Bomb | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > President Roosevelt Approves Production of Atomic Bomb President Roosevelt Approves Production of Atomic Bomb January 19, 1942 Washington, DC President Roosevelt Approves Production of Atomic Bomb

175

Issued by: Approved by: Environmental Health and Safety Radiation Protection Committee Date issued: Date approved: Date revised: Date revision approved:  

E-Print Network (OSTI)

contamination for most radioactive materials in use is 0.5Bq per square centimeter. Different Action Levels for certain radioisotopes may be required and will be listed in the conditions of the Internal Radioisotope Permit. The contamination level may be averaged over an area not exceeding 100 square centimeters. Accidental release: Is defined as the accidental release of radioactive material resulting in following levels of radiation levels: o Greater than 2 mSv/hour on the external surface of a package o Greater than 0.1 mSv/hour at a distance of 1m from the package ALI Annual Limit on Intake Added: The International Commission on Radiological Protection (ICRP) has published Annual Limits on Intake of Radionuclides by Workers Based on the 1990 Recommendations (Publication 60) of the ICRP for limiting dose. The annual limit on intake (ALI) is the maximum intake in becquerel (1 Bq = 1 disintegration per second) that a worker may ingest orally and not exceed his/her annual average dose limit as per the 1990 recommendations. This average annual limit was 20 mSv. The ALIs themselves are published in ICRP Publication 61. The CNSC requires the University to classify each area room or enclosure where unsealed radioactive materials are used at a single time as Basic Level if the quantity does not exceed 5ALIs or Intermediate Level if the quantity does not exceed 50ALIs. (addition approved by RSCttee Feb 2, 2006) Applicable Designated Workers and Permit Holders For the purposes of this defining when dosimetry is required (RSP-310), staff and students working in a lab designated as Intermediate according to RSP-411, working with sealed sources over 370 kBq and personnel working in a Basic Laboratory with radioisotopes other than H-3, C-14, S-35, Ca-45 and P-33 may be considered

unknown authors

2005-01-01T23:59:59.000Z

176

BCDA Machine Status Link  

NLE Websites -- All DOE Office Websites (Extended Search)

Machine Status Link Machine Status Link Version 1.33 (December 2005) David M. Kline. The Machine Status Link (MSL) is responsible for distributing the digitized beam current, injection status, P0 clock, and other statuses over a single fiber to several locations around the Storage Ring. The MRD100 is a VME-based module that is part of the MSL and was specifically designed for the APS. It receives and interprets information from the XMS100 module by means of copper or fiber. Signals from the XMS100 module are sent at a P0 rate (3.667 microseconds). It sends two registers every cycle and all in about 12 cycles. Refer to the ASD website for additional information regarding the MSL. The focus of this page is to provide information of how to configure the MRD100 for a beamline IOC and to discuss the sample IOC

177

Approval Memorandum, Additional Qualification Courses of Fire - December  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approval Memorandum, Additional Qualification Courses of Fire - Approval Memorandum, Additional Qualification Courses of Fire - December 13, 2011 Approval Memorandum, Additional Qualification Courses of Fire - December 13, 2011 December 13, 2011 Request approval of revised courses of fire. As indicated in the background section of the memorandum, subjects: Newly Developed SECURITY Policy Officer/Special Response Team Qualification Courses of Fire, dated October 12,2011, members of the Department of Energy (DOE) Firearms Policy Panel, DOE Training Managers Working Group, the National Nuclear Security Administration, and the DOE National Training Center have devloped , reviewed and revised the following courses of fire (attached) for inclusion in the Protective Force Firearms Qualification Courses Manual. The courses of fire pertain to the incubent Security Police

178

Notice of OMB Action Approving DOE Submission to Extend Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OMB Action Approving DOE Submission to Extend Information OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) has issued a Notice of OMB Action approving the Department of Energy's request to extend for three years the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Supporting documentation for the request was submitted in September and October, 2011. Comments were due on or before November 7, 2011. ICR Supporting Statement (PDF). OMB Form 83-I (PDF). SGIG Reporting Guidance

179

Energy Praises the Nuclear Regulatory Commission Approval of the First  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years March 8, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today commended the Nuclear Regulatory Commission's decision to approve the first-ever Early Site Permit (ESP) for the Exelon Generation Company's Clinton site, in central Illinois. This decision marks a major milestone in the President's plan to expand the use of safe and clean nuclear power. As part of President Bush's Advanced Energy Initiative - which seeks to change the way we power this nation - nuclear power will play an increasingly

180

DOE Approves Field Test for Promising Carbon Capture Technology |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approves Field Test for Promising Carbon Capture Technology Approves Field Test for Promising Carbon Capture Technology DOE Approves Field Test for Promising Carbon Capture Technology November 20, 2012 - 12:00pm Addthis Washington, DC - A promising post combustion membrane technology that can separate and capture 90 percent of the carbon dioxide (CO2) from a pulverized coal plant has been successfully demonstrated and received Department of Energy (DOE) approval to advance to a larger-scale field test. In an $18.75 million project funded by the American Recovery and Reinvestment Act of 2009, Membrane Technology and Research Inc. (MTR) and its partners tested the Polaris™ membrane system, which uses a CO2-selective polymeric membrane (micro-porous films which act as semi-permeable barriers to separate two different mediums) material and

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

BLM Approves Salt Wells Geothermal Energy Projects | Open Energy  

Open Energy Info (EERE)

Energy Projects Energy Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: BLM Approves Salt Wells Geothermal Energy Projects Abstract Abstract unavailable. Author Colleen Sievers Published U.S. Department of the Interior- Bureau of Land Management, Carson City Field Office, Nevada, 09/28/2011 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for BLM Approves Salt Wells Geothermal Energy Projects Citation Colleen Sievers. BLM Approves Salt Wells Geothermal Energy Projects [Internet]. 09/28/2011. Carson City, NV. U.S. Department of the Interior- Bureau of Land Management, Carson City Field Office, Nevada. [updated 2011/09/28;cited 2013/08/21]. Available from: http://www.blm.gov/nv/st/en/fo/carson_city_field/blm_information/newsroom/2011/september/blm_approves_salt.html

182

Global Nuclear Energy Partnership Steering Group Members Approve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Global Nuclear Energy Partnership Steering Group Members Approve Global Nuclear Energy Partnership Steering Group Members Approve Transformation to the International Framework for Nuclear Energy Cooperation Global Nuclear Energy Partnership Steering Group Members Approve Transformation to the International Framework for Nuclear Energy Cooperation June 21, 2010 - 11:59am Addthis The Global Nuclear Energy Partnership Steering Group met in Accra, Ghana on June 16-17, 2010, and approved unanimously several transformative changes to reflect global developments that have occurred since the Partnership was established in 2007. The transformation includes a new name - the International Framework for Nuclear Energy Cooperation -- and the establishment of a new Statement of Mission. Participants in this new International Framework agreed that this

183

ISA Approves Standard for Wireless Automation in Process Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISA Approves Standard for Wireless Automation in Process Control ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications September 22, 2009 - 1:28pm Addthis September 22, 2009 On September 9, the Standards and Practices Board of the International Society for Automation (ISA) approved the ISA-100.11a wireless standard, "Wireless Systems for Industrial Automation: Process Control and Related Applications," making it an official ISA standard. The standard is intended to provide secure, reliable wireless operation for monitoring, alerting, and control applications. It enables robustness with non-ISA-compliant legacy wireless systems, coexistence and interoperability with other wireless devices, and robustness in harsh industrial

184

Chemical Management (Volume 3 of 3), Approval Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TO: April 5, 2005 EH-52:Dan Marsick:3-3954 APPROVAL OF DEPARTMENT OF ENERGY (DOE) CHEMICAL MANAGEMENT HANDBOOK VOLUME 3 Dennis Kubicki, EH-24 This memorandum forwards the...

185

Office of Science Approves Critical Decision 1 for APS Upgrade...  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Office of Science Approves Critical Decision 1 for APS Upgrade Project SEPTEMBER 15, 2011...

186

Headquarters Security Operations Facility Clearance and Approval Program  

Energy.gov (U.S. Department of Energy (DOE))

The Headquarters Facility Clearance and Approval Program (FCAP) is established by DOE Order to administratively determine that a facility is or is not eligible to access, receive, produce, use, and...

187

Retinal prosthesis LLNL helped develop is approved by the FDA  

NLE Websites -- All DOE Office Websites (Extended Search)

6 For immediate release: 02152013 | NR-13-02-06 Retinal prosthesis LLNL helped develop is approved by the FDA Donald B Johnston, LLNL, (925) 423-4902, johnston19@llnl.gov...

188

Bodman Statement On Senate Approval of ANWR Provisions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bodman Statement On Senate Approval of ANWR Provisions Bodman Statement On Senate Approval of ANWR Provisions Bodman Statement On Senate Approval of ANWR Provisions March 16, 2005 - 10:50am Addthis Washington, DC - Energy Secretary Samuel W. Bodman released the following statement today regarding Senate approval of ANWR provisions in the budget resolution: "The Senate's vote today to clear the way for environmentally responsible oil and gas exploration in a small portion of ANWR is a victory for American consumers, America's economy and America's energy security. "Alaska's frozen tundra has the potential to yield billions of barrels of domestically produced oil. Not only could these resources have a meaningful impact on our dependence on imported sources of oil; this means American jobs producing American oil for Americans.

189

Status of DOE A-76 Studies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE A-76 Studies DOE A-76 Studies (A/O July 15, 2008) Function Competition Affected FTE Status Savings RESL FY 07 Standard 19 Completed-Decision Jan. 2008 (MEO win) $4.9M Albany Research Center FY 06 Standard 74 Cancelled June 2007 Legacy Management FY 06 HPO 58 OMB approved HPO-June 2006 $16.5 DOE Logistics FY 02/03 Standard 144 Completed-Decision March 2006 (Contractor win) $1.6M New Brunswick Lab FY 04/05 Standard 40 Completed-Decision March 2006 (MEO win) $2.6M Environmental Engineering Services FY 04/05 Standard 684 CANCELLED September 2005 Information Technology FY 02/03 Standard 642 1000+ Contractors Completed-Decision July 2005 (MEO win) $456M ARC Logistics Standard 8 Completed-Decision March 2005 (MEO win) $0.8M Human Resources FY 02/03 Standard 146 Completed-Decision September

190

GRR/Elements/18-CA-c.15 - Does the DTSC Approve the Application...  

Open Energy Info (EERE)

- Does the DTSC Approve the Application DTSC approves or denies the Hazardous Waste Facility Permit Application. Retrieved from "http:en.openei.orgw...

191

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA)

Weekly Petroleum Status Report/Energy Information Administration v U.S. crude oil refinery inputs averaged about 14.6 million barrels per day during the week ending ...

192

SSRL Light Source Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Synchrotron Radiation Lightsource An Office of Science User Facility Beam Current: 0.00 mA Beam Status: Down Loss Rate: 0.00 mAmin SPEAR Operator Messages 4-SEP-2013...

193

INSTRUCTIONS FOR FILING A WITHDRAWAL with APPROVED EXCUSE Non-Medical and Medical  

E-Print Network (OSTI)

1 INSTRUCTIONS FOR FILING A WITHDRAWAL with APPROVED EXCUSE Non-Medical and Medical Withdraw with Approved Excuse ­ Non-Medical Withdraw with Approved Excuse - Medical Step 1: Attach a statement to page 1 your reasons for seeking a Withdrawal with Approved Excuse for Medical Reasons. Include the last date

Boufadel, Michel

194

Secretary of Energy Announces Approval and Funding for Facilities Upgrade  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Approval and Funding for Facilities Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs Secretary of Energy Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs February 22, 2006 - 12:09pm Addthis NEWPORT NEWS , VA - Secretary of Energy Samuel W. Bodman today announced that President Bush's Fiscal Year 2007 budget request includes $7 million for the upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility. The secretary also visited with students and teachers from the Newport News area who participate in the lab's highly successful Becoming Enthusiastic about Math and Science (BEAMS) educational

195

Oil and Gas Environmental Review and Approval Processes (New Brunswick,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oil and Gas Environmental Review and Approval Processes (New Oil and Gas Environmental Review and Approval Processes (New Brunswick, Canada) Oil and Gas Environmental Review and Approval Processes (New Brunswick, Canada) < Back Eligibility Commercial Developer Fuel Distributor Industrial Investor-Owned Utility Municipal/Public Utility Utility Program Info State New Jersey Program Type Environmental Regulations Provider New Brunswick Natural Resources Oil and natural gas companies engaged in exploration, development and production in New Brunswick will be required by the Department of Environment to undergo a Phased Environmental Impact Assessment (EIA) process. The process will identify potential environmental impacts at the early stages before a project is implemented so that negative environmental impacts can be avoided.

196

Chemical Management (Volume 3 of 3), Approval Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

De part m e n t of En erg y De part m e n t of En erg y memorandum DATE: REPLY T O ATTN OF: SUBJECT: TO: April 5, 2005 EH-52:Dan Marsick:3-3954 APPROVAL OF DEPARTMENT OF ENERGY (DOE) CHEMICAL MANAGEMENT HANDBOOK VOLUME 3 Dennis Kubicki, EH-24 This memorandum forwards the subject DOE technical standard, DOE-HDBK-1139/3-2004 which has been approved for publication and distribution. This standard was reviewed by the Cognizant Secretarial Officer organizations and Operations Offices through a formal coordination process and all comments have been appropriately resolved. Additionally, the Office of Worker Protection Programs and Policy has reviewed and approved the document. A camera-ready copy and an electronic version of the standard in Microsoff Word format are attached. If there are any questions, please contact Dan Marsick of my staff on

197

Memorandum, Additional Approved Qualification Courses of Fire - September  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum, Additional Approved Qualification Courses of Fire - Memorandum, Additional Approved Qualification Courses of Fire - September 23, 2011 Memorandum, Additional Approved Qualification Courses of Fire - September 23, 2011 September 23, 2011 Newly developed Security Police Officer/Special Response Team Qualification Courses of Fire In accordance with DOE Order 473.2 Protection Program Operations , Section E , paragraph 2 and Section K, Paragraph 2, members of the Department of Energy (DOE) Firearms Policy Panel, DOE Protective Forces Safety Committee, DOE Trainin Managers Working Group, the National Nuclear Security Administration, and the DOE National Training Center have developed, reviewed and revised the following courses of fire (attached) for inclusion in the Protective Force Firearms Qualification Courses Manual. The courses

198

ISA Approves Standard for Wireless Automation in Process Control Applications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications September 22, 2009 On September 9, the Standards and Practices Board of the International Society for Automation (ISA) approved the ISA-100.11a wireless standard, "Wireless Systems for Industrial Automation: Process Control and Related Applications," making it an official ISA standard. The standard is intended to provide secure, reliable wireless operation for monitoring, alerting, and control applications. It enables robustness with non-ISA-compliant legacy wireless systems, coexistence and interoperability with other wireless devices, and robustness in harsh industrial environments. To meet the needs of industrial wireless users and operators of low-energy fixed, portable, and moving

199

DOE-APPROVED COOPERATIVE RESEARCH AND DEVELOPMENT AGREEMENT LANGUAGE AND GUIDANCE  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-APPROVED COOPERATIVE RESEARCH AND DOE-APPROVED COOPERATIVE RESEARCH AND DEVELOPMENT AGREEMENT LANGUAGE AND GUIDANCE The Modular Cooperative Research and Development Agreement (CRADA) was developed to promote consistency throughout the Department of Energy (DOE). The Modular CRADA presents DOE- approved language, approved optional language, and guidance for each article. 2 CONTENTS Introduction 4 Negotiating and Approving CRADAs .......................................................................................................... 5 The Importance of Teamwork and Communication ..................................................................................... 5 ARTICLE I: DEFINITIONS ........................................................................................................................ 8

200

September 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - publication anticipated this month.

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Approved Test Procedures Version 1.1 Release Notes  

E-Print Network (OSTI)

Approved Test Procedures Version 1.1 Release Notes 1 Change Reason for Change 302.a drugdrug, drug allergy In the Informative Test Description section Added clarification to the example. 302.c Problem List In the Informative Test Description section Added the sentence "The test also

202

Approved for public release; distribution is unlimited. NAVAL POSTGRADUATE SCHOOL  

E-Print Network (OSTI)

1995 Thesis Advisor: Michael J. Zyda Thesis Co-Advisor: John S. Falby #12;Public reporting burden-18 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 1. AGENCY USE ONLY (Leave Blank) 2. REPORT DATEApproved for public release; distribution is unlimited. THESIS NAVAL POSTGRADUATE SCHOOL Monterey

Zyda, Michael

203

Approved by General Counsel 06/08 Submit in Duplicate  

E-Print Network (OSTI)

and Administration Costs $ Total Project Costs $ 0.00 0.00 #12;Approved by General Counsel 06/08 Page 2 IV. CONTRACT TO BE PERFORMED III. BASIS FOR CALCULATING REIMBURSABLE COSTS; Services of Employees (include fringe benefits $ Subcontracting Costs (contractual services) $ Purchases of Equipment $ Total Direct Costs $ Facilities

204

Distribution Statement A: Approved for public release; distribution is unlimited.  

E-Print Network (OSTI)

: Approved for public release; distribution is unlimited. AHPCRC, The Army High Performance Computing for the warfighter. High performance computing (HPC) provides significant advantages in designing and characterizing theories and best practices of simulation-based engineering sciences and high performance computing

Prinz, Friedrich B.

205

Applying to EPA for Approval of Other Uses of Phosphogypsum  

E-Print Network (OSTI)

Applying to EPA for Approval of Other Uses of Phosphogypsum: Preparing and Submitting a Complete. EP-D-04-007, Work Assignment 0-2 December 2005 #12;ii Applying for Other Uses of Phosphogypsum phosphogypsum in stacks? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.4. What

206

Transfer Credit Approval Form For Transfer Terms and Exchange Programs  

E-Print Network (OSTI)

Transfer Credit Approval Form For Transfer Terms and Exchange Programs CONTINUED Student/transfer term is not a Dartmouth-sponsored program. ______ The regulations for exchange/transfer terms of the COI will review my transfer term application and I may only receive Dartmouth credit for a transfer

Myers, Lawrence C.

207

Microsoft Word - APRIL 2009 PMCDP Module CHRIS ESS Tutorial_APPROVING_OFFICIAL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPROVING OFFICIAL APPROVING OFFICIAL REV: APRIL 2009 1 Review and Approval of Competency 1. Once you have received an email stating that a certification request is ready for your review and approval on ESS, login to ESS. 2. Click on the "PMCDP" menu item. Select "Review/approve employee competency." Approving Official Persons who have been identified by the PMCDP participant as his or her approving official have the responsibility to act upon requests for competency completion, certification, and continuing education completion. ESS Tutorial, Project Management Career Development Program APPROVING OFFICIAL REV: APRIL 2009 2 3. A screen with a table listing all employees who have chosen you as the approving official will be presented. The table listing is presented alphabetically by the employee's last name. Also

208

Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

E15 Approved for Use E15 Approved for Use in 2001 and Newer Vehicles to someone by E-mail Share Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Facebook Tweet about Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Twitter Bookmark Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Google Bookmark Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Delicious Rank Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Digg Find More places to share Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on AddThis.com... E15 Approved for Use in 2001 and Newer Vehicles February 11, 2011 The Renewable Fuel Standard (RFS2) requires refineries and fuel blenders to

209

STATUS OF POTASSIUM IODIDE ACTIVITIES  

E-Print Network (OSTI)

To provide to the Commission revised draft NUREG-1633 (Attachment 1), Assessment of the Use of Potassium Iodide (KI) as a Supplemental Public Protective Action During Severe Reactor Accidents for approval for public comment as directed in Staff Requirements- Affirmation

William D. Travers; Contacts Patricia; A. Milligan

2001-01-01T23:59:59.000Z

210

ESnet Planning, Status,  

NLE Websites -- All DOE Office Websites (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

211

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA) Indexed Site

Petrolem Reports Petrolem Reports Weekly Petroleum Status Report Data for week ending Dec. 13, 2013 | Release Date: Dec. 18, 2013 | Next Release Date: Dec. 27, 2013 | full report Previous Issues Week: December 18, 2013 December 11, 2013 December 4, 2013 November 27, 2013 November 20, 2013 November 14, 2013 November 6, 2013 October 30, 2013 October 23, 2013 October 21, 2013 October 9, 2013 October 2, 2013 prior issues Go The petroleum supply situation in the context of historical information and selected prices. Released after 10:30 a.m. 1:00 p.m. Highlights Weekly Petroleum Status Report Highlights PDF PDF Data Overview (Combined Table 1 and Table 9) PDF Tables 1 U.S. Petroleum Balance Sheet CSV XLS PDF 2 U.S. Inputs and Production by PAD District CSV XLS PDF

212

Small Business Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact of Teaming Arrangements on Impact of Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors should be aware of the Small Business Administration's regulations regarding affiliation. As such, DOE will include the following provision in solicitations where it expects teaming or joint ventures to propose. GUIDANCE FOR PROSPECTIVE OFFERORS - IMPACT OF TEAMING ARRANGEMENTS ON SMALL BUSINESS STATUS (a) This procurement has been set aside for small business. In order to ensure that award

213

Hopper Updates and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled maintenance tomorrow (Sept 19) and /project outage 18 September 2012, 4:46 pm Please use "gres" settings in your batch scripts 4 September 2012, 2:03 pm high thruput queue now available on Hopper 30 August 2012, 4:27 pm max walltime for low queue is increased to 24 hrs on Hopper

214

Status of MARS Code  

SciTech Connect

Status and recent developments of the MARS 14 Monte Carlo code system for simulation of hadronic and electromagnetic cascades in shielding, accelerator and detector components in the energy range from a fraction of an electronvolt up to 100 TeV are described. these include physics models both in strong and electromagnetic interaction sectors, variance reduction techniques, residual dose, geometry, tracking, histograming. MAD-MARS Beam Line Build and Graphical-User Interface.

N.V. Mokhov

2003-04-09T23:59:59.000Z

215

MARS Flight Engineering Status  

DOE Green Energy (OSTI)

The Multi-sensor Airborne Radiation Survey Flight Engineering project (MARS FE) has designed a high purity germanium (HPGe) crystal array for conducting a wide range of field measurements. In addition to the HPGe detector system, a platform-specific shock and vibration isolation system and environmental housing have been designed to support demonstration activities in a maritime environment on an Unmanned Surface Vehicle (USV). This report describes the status of the equipment as of the end of FY09.

Fast, James E.; Dorow, Kevin E.; Morris, Scott J.; Thompson, Robert C.; Willett, Jesse A.

2010-04-06T23:59:59.000Z

216

Antares: a status report  

DOE Green Energy (OSTI)

Antares is the Los Alamos Scientific Laboratory 100-kJ CO/sub 2/ laser driver for inertial confinement fusion experiments. The status of the various Antares subsystems is discussed. These subsystems consist of facilities, front end, energy storage, power amplifier, target, optical alignment and diagnostics, large optics, and controls. The installation of Antares is underway and the schedule to permit experiments which may lead to breakeven in 1984 is discussed.

Stine, R.D. Jr.

1979-01-01T23:59:59.000Z

217

Status of KLOE-2  

E-Print Network (OSTI)

In a few months the KLOE-2 detector is expected to start data taking at the upgraded DA$\\rm{\\Phi}$NE $\\phi$-factory of INFN Laboratori Nazionali di Frascati. It aims to collect 25 fb$^{-1}$ at the $\\phi(1020)$ peak, and about 5 fb$^{-1}$ in the energy region between 1 and 2.5 GeV. We review the status and physics program of the project

,

2010-01-01T23:59:59.000Z

218

Status of fusion maintenance  

SciTech Connect

Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission.

Fuller, G.M.

1984-01-01T23:59:59.000Z

219

Weekly Petroleum Status Report April 17, 2013  

U.S. Energy Information Administration (EIA)

Released: April 17, 2013 Weekly Petroleum Status Report --- Full report in PDF file. Highlights: Weekly Petroleum Status Report Highlights: PDF

220

Approval Process for Dual Compensation Waivers for Reemployed Annuitants  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 10 MEMORANDUM FOR HUMAN RESOURCE DIRECTORS ~~~ - FROM: SARAH J. NILLA, DIRECTOR OFFICE 0 UMAN CAPITAL MANAGEMENT SUBJECT: POLICY MEMORANDUM # 11: APPROVAL PROCESS FOR DUAL COMPENSATION WAIVERS FOR REEMPLOYED ANNUITANTS Section 1122 of the National Defense Authorization Act for Fiscal Year 2010, Public Law 111-84 (Pub. L 111-84) allows the head of an agency to grant dual compensation (salary-offset) waivers to reemployed annuitants who work on a limited basis without reduction to their retirement annuity. This provision in the law expires October 27, 2014. Secretary Chu has delegated the authority to approve all dual compensation waiver requests to the Department's Chief Human Capital Officer (CHCO). This authority can be used to: a) Fulfill functions critical to the mission of the agency (or any subcomponent of

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DOE Technical Standards Program: Online Approved DOE Technical Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Online Approved DOE Technical Standards Online Approved DOE Technical Standards No. 1001 – 2000 No. 3001 – 4000 No. 4001 – 5500 No. 5501 – 6000 No. 6001 – 6500 No. 7501 – 7750 Document Number Range 1001 – 2000 Number Title DOE-HDBK-1001-96 Guide to Good Practices for Training and Qualification of Instructors (80 pages) PDF (226 KB) DOE-HDBK-1002-96 Guide to Good Practices for Training and Qualification of Chemical Operators (70 pages) PDF (311 KB) DOE-HDBK-1003-96 Guide to Good Practices for Training and Qualification of Maintenance Personnel (106 pages) PDF (391 KB) DOE-HDBK-1010-92 (Reaffirmed 1999) DOE Fundamentals Handbook, Classical Physics (142 pages) PDF (1120 KB) DOE-HDBK-1011/1-92 (Reaffirmed 1999) DOE Fundamentals Handbook, Electrical Science, Volume 1 of 4 (166 pages) PDF (4255 KB)

222

SNS FY 2013 Q1-4 Revision 2 Approved  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Q1-4 Revision 2 Approved Revised 6112013 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6...

223

FDA Approves Drug for Type 2 Diabetes Invented with Aid of Protein...  

NLE Websites -- All DOE Office Websites (Extended Search)

FDA Approves Drug for Type 2 Diabetes Invented with Aid of Protein Structure Data Taken at ALS FDA Approves Drug for Type 2 Diabetes Invented with Aid of Protein Structure Data...

224

GRR/Elements/14-CA-b.10 - Did majority of RWQCB approve the permit | Open  

Open Energy Info (EERE)

10 - Did majority of RWQCB approve the permit 10 - Did majority of RWQCB approve the permit < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-b.10 - Did majority of RWQCB approve the permit Following the public hearing, the RWQCB votes on whether or not to approve the permit. The permit is approved with a majority vote. If the RWQCB denies the permit, the process ends. If the RWQCB votes to approve the permit, the permit is forwarded to the Environmental Protection Agency for approval. Estimated Time Clock.png 10 days0.0274 years 240 hours 1.429 weeks 0.329 months No explanation of time estimate. Logic Chain No Parents \V/ GRR/Elements/14-CA-b.10 - Did majority of RWQCB approve the permit (this page) \V/ No Dependents Under Development Add.png Add an Element

225

File:08HIATransmissionLineApproval.pdf | Open Energy Information  

Open Energy Info (EERE)

HIATransmissionLineApproval.pdf HIATransmissionLineApproval.pdf Jump to: navigation, search File File history File usage Metadata File:08HIATransmissionLineApproval.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 39 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:13, 21 August 2013 Thumbnail for version as of 16:13, 21 August 2013 1,275 × 1,650 (39 KB) Alevine (Talk | contribs) 13:53, 8 January 2013 Thumbnail for version as of 13:53, 8 January 2013 1,275 × 1,650 (39 KB) Alevine (Talk | contribs) 17:29, 1 November 2012 Thumbnail for version as of 17:29, 1 November 2012 1,275 × 1,650 (49 KB) Alevine (Talk | contribs)

226

Status of Wheeler Reservoir  

DOE Green Energy (OSTI)

This is one in a series of status reports prepared by the Tennessee Valley Authority (TVA) for those interested in the conditions of TVA reservoirs. This overview of Wheeler Reservoir summarizes reservoir purposes and operation, reservoir and watershed characteristics, reservoir uses and use impairments, and water quality and aquatic biological conditions. The information presented here is from the most recent reports, publications, and original data available. If no recent data were available, historical data were summarized. If data were completely lacking, environmental professionals with special knowledge of the resource were interviewed. 12 refs., 2 figs.

Not Available

1990-09-01T23:59:59.000Z

227

Distributed Generation Status Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 DOE Peer Review Presentation 0 DOE Peer Review Presentation © Chevron 2010 CERTS Microgrid Demonstration with Large scale Energy Storage & Renewable Generation November 5, 2010 Presented By: Craig Gee, Project Manager (for Mr. Eduardo Alegria - Principal Investigator) Energy Solutions November 2010 DOE Peer Review Presentation © Chevron 2010 Agenda * Introduction - Who we are * Project Team & Site * Project Purpose & Objectives * Project Impacts * System Elements * Project Status * Research Elements * Recent Developments in California * Questions & Comments November 2010 DOE Peer Review Presentation © Chevron 2010 Chevron Energy Solutions Designed & Implemented over 900 Projects in the U.S.  Chevron ES, a division of Chevron USA, Inc. is committed to delivering economically & environmentally advantageous green

228

Selective Catalytic Reduction (SCR) of nitric oxide with ammonia using Cu-ZSM-5 and Va-based honeycomb monolith catalysts: effect of H2 pretreatment, NH3-to-NO ratio, O2, and space velocity  

E-Print Network (OSTI)

In this work, the steady-state performance of zeolite-based (Cu-ZSM-5) and vanadium-based honeycomb monolith catalysts was investigated in the selective catalytic reduction process (SCR) for NO removal using NH3. The aim was to delineate the effect of various parameters including pretreatment of the catalyst sample with H2, NH3-to-NO ratio, inlet oxygen concentration, and space velocity. The concentrations of the species (e.g. NO, NH3, and others) were determined using a Fourier Transform Infrared (FTIR) spectrometer. The temperature was varied from ambient (25 C) to 500 C. The investigation showed that all of the above parameters (except pre-treatment with H2) significantly affected the peak NO reduction, the temperature at which peak NO reduction occurred, and residual ammonia left at higher temperatures (also known as 'NH3 slip'). Depending upon the particular values of the parameters, a peak NO reduction of around 90% was obtained for both the catalysts. However, an accompanied generation of N2O and NO2 species was observed as well, being much higher for the vanadium-based catalyst than for the Cu-ZSM-5 catalyst. For both catalysts, the peak NO reduction decreased with an increase in space velocity, and did not change significantly with an increase in oxygen concentration. The temperatures at which peak NO reduction and complete NH3 removal occurred increased with an increase in space velocity but decreased with an increase in oxygen concentration. The presence of more ammonia at the inlet (i.e. higher NH3-to-NO ratio) improved the peak NO reduction but simultaneously resulted in an increase in residual ammonia. Pretreatment of the catalyst sample with H2 (performed only for the Cu-ZSM-5 catalyst) did not produce any perceivable difference in any of the results for the conditions of these experiments.

Gupta, Saurabh

2003-08-01T23:59:59.000Z

229

DOE-TSPP-8, Approving and Issuing DOE Technical Standards - August 1, 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TSPP-8, Approving and Issuing DOE Technical Standards - August TSPP-8, Approving and Issuing DOE Technical Standards - August 1, 2000 DOE-TSPP-8, Approving and Issuing DOE Technical Standards - August 1, 2000 Technical Standards Program Procedures (TSPP) This procedure provides guidance for approving and issuing DOE Technical Standards. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, and laboratories (hereafter referred to collectively as "DOE Components") working to the latest revision of DOE Order 252.1, "Technical Standards Program." DOE-TSPP-8, Approving and Issuing DOE Technical Standards - August 1, 2000 More Documents & Publications APPROVING AND ISSUING DOE TECHNICAL STANDARDS DOE-TSPP-8, Approving and Issuing DOE Technical Standards - July 1, 2009

230

March 29, 2011, Federal Technical Capabilities Panel Face-to-Face Meeting - FY 2011 Operational Plan Goals Status for Goal 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Functional Area Qualification Standards Enhancements Functional Area Qualification Standards Enhancements Deborah Monette, Champion Status: ◦ Developed Action Plan ◦ Conducted Initial Conference Call Next Steps: Next Steps: ◦ Identify viable qualification paths (4/15) Staged qualification from Entry to Expert ◦ Revise "Expert" definition in FAQS' (4/15) Knowledge and practical experience based ◦ Produce qualification path plan for FTCP Agent ◦ Produce qualification path plan for FTCP Agent comment/approval (7/30) Status: ◦ Action Plan submitted for Panel approval ◦ Brief Panel on Human Factors Engineering (3/29) Next Steps: Next Steps: ◦ Identify competencies and supporting knowledge and skills related to HFE for selected TQP functional areas (5/30) ◦ Panel approve HFE competencies (7/30)

231

OMB Approval No. 0348-0041 BUDGET INFORMATION - Construction Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OMB Approval No. 0348-0041 BUDGET INFORMATION - Construction Programs NOTE: Certain Federal assistance programs require additional computations to arrive at the Federal share of project costs eligible for participation. If such is the case, you will be notified. COST CLASSIFICATION a. Total Cost b. Costs Not Allowable for Participation c. Total Allowable Costs (Columns a-b) 1 Administrative and legal expenses $0.00 $0.00 $0.00 2 Land, structures, rights-of-way, appraisals, etc. $0.00 $0.00 $0.00 3 Relocation expenses and payments

232

Fuel Cell Development Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Development Status Michael Short Systems Engineering Manager United Technologies Corporation Research Center Hamilton Sundstrand UTC Power UTC Fire & Security Fortune 50 corporation $52.9B in annual sales in 2009 ~60% of Sales are in building technologies Transportation Stationary Fuel Cells Space & Defense * Fuel cell technology leader since 1958 * ~ 550 employees * 768+ Active U.S. patents, more than 300 additional U.S. patents pending * Global leader in efficient, reliable, and sustainable fuel cell solutions UTC Power About Us PureCell ® Model 400 Solution Process Overview Power Conditioner Converts DC power to high-quality AC power 3 Fuel Cell Stack Generates DC power from hydrogen and air 2 Fuel Processor Converts natural gas fuel to hydrogen

233

DFC Technology Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Pinakin Patel Pinakin Patel Mohammad Farooque FuelCell Energy, Inc. 3 Great Pasture Road Danbury, Ct 06813 DFC Technology Status * Distributed generation puts power where it's needed * Increases power reliability * Near zero emissions allow units to be sited almost anywhere - even polluted urban areas * Reduces need for central generation plants * Reduces grid congestion and need for new transmission lines * Distributed generation enables smart grid * Balances the grid with 24/7 power * Meets requirements for low carbon technology * Smaller projects enable faster permitting, financing, and execution DFC power plant is an enabler for broad distributed generation 600 kW at M&L Commodities Distributed Generation FuelCell Energy Products Fuel Cell Stack DFC300 Single Module

234

RIA Overview and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Science Office of Science U.S. Department of Energy Guy Savard Argonne National Laboratory & University of Chicago Based on Material presented at the ATLAS Operation's Review December 8-10, 2003 by The Californium Source Upgrade 2 Pioneering Science and Technology Office of Science U.S. Department of Energy 12/8-10/2003 ATLAS Upgrade Guy Savard ATLAS Status * ATLAS only low-energy accelerator for stable ions operating as a User Facility with well documented characteristics (reliability, beam quality, transmission, timing,...) * Excellent and varied physics program with a large User community * What lies ahead for ATLAS * Maintain position as premier low-energy heavy ion accelerator * Address open physics/technical questions leading to RIA * Help the community in the "pre-RIA"

235

Area 410 status and capabilities  

SciTech Connect

This memo is distributed to acquaint personnel with (a) the status of the various 410 areas, (b) time and personnel required to do optic experiments in the ``Dog`` area, and (c) status of the timing and firing system and conditions of cables from Able to Dog.

Bennett, W. P.

1962-10-01T23:59:59.000Z

236

SNS Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS Operating Status Current Beam Status 101713 11:43 Beam is back on target at 485 kW. Power increases will occur throughout the day. Status, Schedules & Alerts Energy and...

237

Directory of certificiates of compliance for radioactive materials packages: Report of NRC approved packages. Revision 19, Volume 1  

SciTech Connect

This directory provides information on packagings approved by the U.S. Nuclear Regulatory Commission.

NONE

1996-10-01T23:59:59.000Z

238

Tip for working with approvals on OpenEI | OpenEI Community  

Open Energy Info (EERE)

Tip for working with approvals on OpenEI Tip for working with approvals on OpenEI Home > Groups > Utility Rate Rmckeel's picture Submitted by Rmckeel(297) Contributor 11 June, 2013 - 09:33 EZFeed Utility Rates The "ApprovedRevs" extension is the feature on OpenEI that allows crowd-sourced data to be quality-controlled (approved) in a formal fashion. The incentive & policy (including EZFeed data) and utility rate sections use this feature. Using specially formatted Ask queries, we can create RSS feeds of the latest updated data in any particular category on OpenEI. Here is an example of the EZFeed data update feed. But what if you want to know more about entries that are not yet approved? Check out this page to see pages whose approved revision is not their latest. While it is not filterable

239

GRR/Section 15-UT-a - Utah Air Permit Approval Order | Open Energy  

Open Energy Info (EERE)

5-UT-a - Utah Air Permit Approval Order 5-UT-a - Utah Air Permit Approval Order < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-UT-a - Utah Air Permit Approval Order 15UTAUtahAirPermitApprovalOrder.pdf Click to View Fullscreen Contact Agencies Utah Department of Environmental Quality Regulations & Policies UAC R307-300 UAC R307-400 Triggers None specified Click "Edit With Form" above to add content 15UTAUtahAirPermitApprovalOrder.pdf 15UTAUtahAirPermitApprovalOrder.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Utah Department of Environmental Quality Division of Air Quality (DEQ) issues permits for operations that emit contaminants into the air. Most new

240

GRR/Elements/14-CA-c.12 - Does the DOGGR Approve the Underground Injection  

Open Energy Info (EERE)

- Does the DOGGR Approve the Underground Injection - Does the DOGGR Approve the Underground Injection Project < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-c.12 - Does the DOGGR Approve the Underground Injection Project After the end of the comment period and after reviewing any proposed revisions furnished by the Regional Board, the State Board decides whether to approve the Underground Injection Project. Logic Chain No Parents \V/ GRR/Elements/14-CA-c.12 - Does the DOGGR Approve the Underground Injection Project (this page) \V/ No Dependents Under Development Add.png Add an Element Retrieved from "http://en.openei.org/w/index.php?title=GRR/Elements/14-CA-c.12_-_Does_the_DOGGR_Approve_the_Underground_Injection_Project&oldid=539630

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Attachment I: Approval of Agreement-in-Principal with the State of Alaska |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I: Approval of Agreement-in-Principal with the State of I: Approval of Agreement-in-Principal with the State of Alaska Attachment I: Approval of Agreement-in-Principal with the State of Alaska US Department of Energy Memorandum DATE: January 31, 1995 REPLY TO ATTN OF: EM-22 (C. Smoot, 202/586-2352) SUBJECT: Approval of Agreement-in-Principle with the State of Alaska TO: Manager, Nevada Operations Office Thank you for providing the draft Agreement-in-Principle with the State of Alaska for review and approval. I approve the execution of the Agreement-in-Principle and related grant, contingent on modification of the agreement to reflect the attached comments. Of special note, the agreement should be modified to include (1) language that requires state quarterly performance reporting as part of the grant requirements and (2) language

242

GRR/Section 8-HI-a - Transmission Line Approval | Open Energy Information  

Open Energy Info (EERE)

8-HI-a - Transmission Line Approval 8-HI-a - Transmission Line Approval < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-HI-a - Transmission Line Approval 08HIATransmissionLineApproval.pdf Click to View Fullscreen Contact Agencies Hawaii Public Utilities Commission Triggers None specified Click "Edit With Form" above to add content 08HIATransmissionLineApproval.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer must obtain Transmission Line Approval from the Hawaii Public Utilities Commission (PUC) to interconnect a proposed renewable energy project to the existing grid, when new transmission lines are required.

243

GRR/Elements/14-CA-c.11 - Updated Draft Project Approval Letter | Open  

Open Energy Info (EERE)

1 - Updated Draft Project Approval Letter 1 - Updated Draft Project Approval Letter < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-c.11 - Updated Draft Project Approval Letter The DOGGR State Board prepares an Updated Draft Project Approval Letter, reflecting the the public comments and Regional Board' proposed revisions. Logic Chain No Parents \V/ GRR/Elements/14-CA-c.11 - Updated Draft Project Approval Letter (this page) \V/ No Dependents Under Development Add.png Add an Element Retrieved from "http://en.openei.org/w/index.php?title=GRR/Elements/14-CA-c.11_-_Updated_Draft_Project_Approval_Letter&oldid=539626" Categories: Geothermal Regulatory Roadmap Elements Under Development What links here Related changes

244

SNS Operations Status Update | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Home SNS Operations Status Update SNS Operations Status Update - November 29, 2012 Resumption of SNS Operations and User Program Neutron production resumed on November 29,...

245

B133 Facility Screening Report (SCR)  

Science Conference Proceedings (OSTI)

B133 is located in the southwest quadrant inside the 1 square mile site of Lawrence Livermore National Laboratory. The property is about 250 meters from the nearest boundary along Vasco Road. Building 133 is a 1 story steel framed building constructed in 1994 with stainless steel sidings. The facility covers 5,631 gross square feet of space. The building is used to house equipment to heat and cool buildings 132N and 132S. A 1380 volts electrical substation is located outside on the northeast corner, along with 2 diesel generators and a 1000 gallons diesel fuel tank. An evaporative cooling tower is located to the south of B133 to dissipate heat from the chillers located in B133. The inside of the facility is divided into three main rooms housing the cooling system units, the boilers, and the electrical distribution panels. The facility has an automatic sprinkler system installed through out and a Freon alarm located in room 1000. Building 133 is used to supply electrical power, chilled water, and hot water to Bldgs 132 N & S. Primary activities include servicing and maintaining chillers, boilers, and electrical distribution equipment.

Cooper, G

2007-01-26T23:59:59.000Z

246

Notice of Office of Management and Budget Action to Approve with...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants...

247

Notice of Office of Management and Budget Action to Approve with...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants Notice...

248

GRR/Elements/14-CA-c.12 - Does the DOGGR Approve the Underground...  

Open Energy Info (EERE)

- Does the DOGGR Approve the Underground Injection Project < GRR | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List...

249

DOE-STD-1104-96 CN-1; Review and Approval of Nuclear Facility...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

institutional programs in Integrated Safety Management System documents and site-wide manuals was added. p. 13 Sect. 3 Approval Bases for Technical Safety Requirements New...

250

Design, status and first operations of the spallation neutron source polyphase resonant converter modulator system  

DOE Green Energy (OSTI)

The Spallation Neutron Source (SNS) is a new 1.4 MW average power beam, 1 GeV accelerator being built at Oak Ridge National Laboratory. The accelerator requires 15 converter-modulator stations each providing between 9 and 11 MW pulses with up to a 1 .I MW average power. The converter-modulator can be described as a resonant 20 kHz polyphase boost inverter. Each converter modulator derives its buss voltage from a standard substation cast-core transformer. Each substation is followed by an SCR pre-regulator to accommodate voltage changes from no load to full load, in addition to providing a soft-start function. Energy storage is provided by self-clearing metallized hazy polypropylene traction capacitors. These capacitors do not fail short, but clear any internal anomaly. Three 'H-Bridge' IGBT transistor networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are time-gated to generate the desired klystron pulse width. Pulse width modulation of the individual 20 lcHz pulses is utilized to provide regulated output waveforms with DSP based adaptive feedforward and feedback techniques. The boost transformer design utilizes nanocrystalline alloy that provides low core loss at design flux levels and switching frequencies. Capacitors are used on the transformer secondary networks to resonate the leakage inductance. The transformers are wound for a specific leakage inductance, not turns ratio. This design technique generates multiple secondary volts per turn as compared to the primary. With the appropriate tuning conditions, switching losses are minimized. The resonant topology has the added benefit of being deQed in a klystron fault condition, with little energy deposited in the arc. This obviates the need of crowbars or other related networks. A review of these design parameters, operational performance, production status, and OWL installation and performance to date will be presented.

Reass, W. A. (William A.); Apgar, S. E. (Sean E.); Baca, D. M. (David M.); Doss, James D.; Gonzales, J. (Jacqueline); Gribble, R. F. (Robert F.); Hardek, T. W. (Thomas W.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Trujillo, P. B. (Pete B.); Anderson, D. E. (David E.); Heidenreich, D. A. (Dale A.); Hicks, J. D. (Jim D.); Leontiev, V. N.

2003-01-01T23:59:59.000Z

251

Business Plan Process Status Update  

Business Plan Process Status Update 2009: 10 - Business schools visited or contacted in Bay Area to date (CSEB, GGU, SCU, SJSU, Stanford, St. Marys, UCB, UCD, UOP ...

252

Status of Oregon's Bull Trout.  

Science Conference Proceedings (OSTI)

Limited historical references indicate that bull trout Salvelinus confluentus in Oregon were once widely spread throughout at least 12 basins in the Klamath River and Columbia River systems. No bull trout have been observed in Oregon's coastal systems. A total of 69 bull trout populations in 12 basins are currently identified in Oregon. A comparison of the 1991 bull trout status (Ratliff and Howell 1992) to the revised 1996 status found that 7 populations were newly discovered and 1 population showed a positive or upgraded status while 22 populations showed a negative or downgraded status. The general downgrading of 32% of Oregon's bull trout populations appears largely due to increased survey efforts and increased survey accuracy rather than reduced numbers or distribution. However, three populations in the upper Klamath Basin, two in the Walla Walla Basin, and one in the Willamette Basin showed decreases in estimated population abundance or distribution.

Buchanan, David V.; Hanson, Mary L.; Hooton, Robert M.

1997-10-01T23:59:59.000Z

253

Fusion technology status and requirements  

SciTech Connect

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

254

GSE Web Policy Approved by Coordinating Council 5/11/2009  

E-Print Network (OSTI)

GSE Web Policy Approved by Coordinating Council 5/11/2009 Revision approved 11/22/2010 1 statement Students and the public at large are increasingly turning to the web as the primary information a consistent, accurate message. 3. The GSE WebTeam The GSE has developed a WebTeam to work directly

255

Roadmap to NRC Approval of Ceramic Matrix Composites in Generation IV Reactors  

SciTech Connect

This report provides an initial roadmap to obtain Nuclear Regulatory Commission (NRC) approval for using these material systems in a nuclear application. The possible paths taken to achieving NRC approval are necessarily subject to change as this is an on-going process that shifts as more data and a clearer understanding of the nuclear regulations are gathered.

M. G. Jenkins; E. Lara-Curzio; W. Windes

2006-05-01T23:59:59.000Z

256

APPROVED ICE STORAGE AIR CONDITIONERS Revised as of 06-18-2008  

E-Print Network (OSTI)

APPROVED ICE STORAGE AIR CONDITIONERS Revised as of 06-18-2008 The following vendors and their ice storage air conditioners models can be used in the ice storage air conditioner compliance option. Input details are listed below for the approved equipment. Manufacturer Ice Energy, Inc 9351 Eastman Park Drive

257

DOE-TSPP-6-2013, Approving and Issuing DOE Technical Standards | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-2013, Approving and Issuing DOE Technical Standards 6-2013, Approving and Issuing DOE Technical Standards DOE-TSPP-6-2013, Approving and Issuing DOE Technical Standards Technical Standards Program Procedures (TSPP) - September 16, 2013 This procedure provides guidance for approving and issuing the Department of Energy (DOE) Technical Standards. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, and laboratories (hereafter referred to collectively as Technical Standards Program (TSP) participants) working to the latest revision of DOE Order (O) 252.1A, Technical Standards Program. DOE-TSPP-6-2013, Approving and Issuing DOE Technical Standards More Documents & Publications DOE-TSPP-7-2013, Maintaining DOE Technical Standards DOE-TSPP-6, Coordination of DOE Technical Standards - July 1, 2009

258

Notice of Office of Management and Budget Action to Approve with Change the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an Extension of the ICR an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension without Change of a Currently Approved Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants More Documents & Publications Notice of Office of Management and Budget Action to Approve with Change the

259

Savannah River Site Approved Site Treatment Plan, 1998 Annual Update  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

Lawrence, B. [Westinghouse Savannah River Company, AIKEN, SC (United States); Berry, M.

1998-03-01T23:59:59.000Z

260

Approved Site Treatment Plan, Volumes 1 and 2. Revision 4  

SciTech Connect

The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

Helmich, E.H.; Molen, G.; Noller, D.

1996-03-22T23:59:59.000Z

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Characterization of spent fuel approved testing material: ATM-106  

Science Conference Proceedings (OSTI)

The characterization data obtained to date are described for Approved Testing Material (ATM)-106 spent fuel from Assembly BT03 of pressurized-water reactor Calvert Cliffs No. 1. This report is one in a series being prepared by the Materials Characterization Center at Pacific Northwest Laboratory on spent fuel ATMs. The ATMs are receiving extensive examinations to provide a source of well- characterized spent fuel for testing in the US Department of Energy Office of Civilian Radioactive Waste Management (OCWRM) program. ATM-106 consists of 20 full-length irradiated fuel rods with rod-average burnups of about 3700 GJ/kgM (43 MWd/kgM) and expected fission gas release of /approximately/10%. Characterization data include (1) as-fabricated fuel design, irradiation history, and subsequent storage and handling; (2) isotopic gamma scans; (3) fission gas analyses; (4) ceramography of the fuel and metallography of the cladding; (5) calculated nuclide inventories and radioactivities in the fuel and cladding; and (6) radiochemical analyses of the fuel and cladding. Additional analyses of the fuel rod are being conducted and will be included in planned revisions of this report. 12 refs., 110 figs., 81 tabs.

Guenther, R.J.; Blahnik, D.E.; Campbell, T.K.; Jenquin, U.P.; Mendel, J.E.; Thornhill, C.K.

1988-10-01T23:59:59.000Z

262

Characterization of spent fuel approved testing material---ATM-105  

Science Conference Proceedings (OSTI)

The characterization data obtained to data are described for Approved Testing Material 105 (ATM-105), which is spent fuel from Bundles CZ346 and CZ348 of the Cooper Nuclear Power Plant, a boiling-water reactor. This report is one in a series being prepared by the Materials Characterization Center at Pacific Northwest Laboratory (PNL) on spent fuel ATMs. The ATMs are receiving extensive examinations to provide a source of well-characterized spent fuel for testing in the US Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) Program. ATM-105 consists of 88 full-length irradiated fuel rods with rod-average burnups of about 2400 GJ/kgM (28 MWd/kgM) and expected fission gas release of about 1%. Characterization data include (1) descriptions of as-fabricated fuel design, irradiation history, and subsequent storage and handling; (2) isotopic gamma scans; (3) fission gas analyses; (4) ceramography of the fuel and metallography of the cladding; (5) special fuel studies involving analytical transmission electron microscopy (AEM); (6) calculated nuclide inventories and radioactivities in the fuel and cladding; and (7) radiochemical analyses of the fuel and cladding. Additional analyses of the fuel are being conducted and will be included in planned revisions of this report.

Guenther, R.J.; Blahnik, D.E.; Campbell, T.K.; Jenquin, U.P.; Mendel, J.E.; Thomas, L.E.; Thornhill, C.K.

1991-12-01T23:59:59.000Z

263

Characterization of spent fuel approved testing material--ATM-104  

SciTech Connect

The characterization data obtained to date are described for Approved Testing Material 104 (ATM-104), which is spent fuel from Assembly DO47 of the Calvert Cliffs Nuclear Power Plant (Unit 1), a pressurized-water reactor. This report is one in a series being prepared by the Materials Characterization Center at Pacific Northwest Laboratory (PNL) on spent fuel ATMs. The ATMs are receiving extensive examinations to provide a source of well-characterized spent fuel for testing in the US Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) Program. ATM-104 consists of 128 full-length irradiated fuel rods with rod-average burnups of about 42 MWd/kgM and expected fission gas release of about 1%. A variety of analyses were performed to investigate cladding characteristics, radionuclide inventory, and redistribution of fission products. Characterization data include (1) fabricated fuel design, irradiation history, and subsequent storage and handling history; (2) isotopic gamma scans; (3) fission gas analyses; (4) ceramography of the fuel and metallography of the cladding; (5) special fuel studies involving analytical transmission electron microscopy (AEM) and electron probe microanalyses (EPMA); (6) calculated nuclide inventories and radioactivities in the fuel and cladding; and (7) radiochemical analyses of the fuel and cladding.

Guenther, R.J.; Blahnik, D.E.; Jenquin, U.P.; Mendel, J.E.; Thomas, L.E.; Thornhill, C.K.

1991-12-01T23:59:59.000Z

264

Action Item Review and Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

265

Microsoft PowerPoint - FAQS Status_Sep 18 2012_JYarrington.ppt [Compatibility Mode]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 18, 2012 September 18, 2012 Jeanette Yarrington Updates to TSP Process * Five-year "Sunset" reviews - for currency, accuracy, and continuing need/value. * Project Justification Statement (PJS) prior to proceeding with a new or revised DOE technical standard with a new or revised DOE technical standard. * The convention that the TSP is adopting is for all DOE The convention that the TSP is adopting is for all DOE Technical Standards requirements to be written with "shall" statements, consistent with the convention used b t j ti l t d d b di by most major national consensus standards bodies. Status of FAQS Qualification Standard Sponsor/POC FTCP Agent Status Chemical Processing EM/Mike Mikolanis and Patricia Suggs Mike Mikolanis Complete - Approved 02/2010 Criticality Safety Idaho/Adolf Dary Newbry

266

Status of the MEG Experiment  

Science Conference Proceedings (OSTI)

The MEG experiment which searches for ?? e ? decays at the sensitivity level of 10 ?13 is now in its final stage of the preparation. Some data run is expected by the end of the year 2007. The statuses of each detector components are described.

Aki Maki; MEG Group

2008-01-01T23:59:59.000Z

267

RENEWABLES 2005 GLOBAL STATUS REPORT  

E-Print Network (OSTI)

Research Institute Chinese Renewable Energy Industries Association China Susan McDade Energy EnvironmentRENEWABLES 2005 GLOBAL STATUS REPORT Paper prepared for the REN21 Network by The Worldwatch Institute Lead Author: Eric Martinotwww.ren21.net #12;Renewable Energy Policy Network for the 21st Century

Kammen, Daniel M.

268

-----_ _111 _ _ _ __ HEALTH STATU~S  

E-Print Network (OSTI)

- - - - -_ _111 _ _ _ __ HEALTH STATU~S OF VIETNAM VETER~I~NS SUPPLEMENT A LABORATORY METHOD~3 AND QUALITY CONTROL U.S. DEPARTMENT OF HEALTH AND HUMAN SEIIVICES PUBLIC HEALTH SERVICE Control Vietnam Experience Study January 1989 t t U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES

269

ESnet Network Measurement Current Status  

E-Print Network (OSTI)

1 ESnet Network Measurement Current Status Joe Metzger Jan 24th 2008 ESCC meeting Energy Sciences ­ Regular scheduled bandwidth testing · Internal to ESnet IP & SDN Network · External to important peers, and ESnet sites that are interested ­ Dynamic end-user testing via · perfSONAR · ESnet Performance Center

270

ESnet Network Measurement Current Status &  

E-Print Network (OSTI)

1 ESnet Network Measurement Current Status & Future Plans Joe Metzger - with slides copied from Networking for the Future of Science #12;2 Overview · ESnet Services ­ New content · LHC Requirements problems and get more systems deployed ­ Regular scheduled bandwidth testing · Internal to ESnet IP & SDN

271

SPIRAL2 at GANIL: Status and Perspectives  

SciTech Connect

To pursue the investigation of a new territory of nuclei with extreme N/Z called 'terra incognita' several projects, all aiming at the increase by several orders of magnitude of the RIB intensities are now under discussions worldwide. In Europe, two major new projects have been approved recently FAIR-GSI using the so-called 'in-flight' method and SPIRAL2-GANIL, based on the ISOL method. Both projects were selected in the European Strategic Roadmap For research Infrastructures (ESFRI). The main goal of SPIRAL2 is clearly to extend our knowledge of the limit of existence and the structure of nuclei deeply in the medium and heavy mass region (A = 60 to 140) which is to day an almost unexplored continent. SPIRAL 2 is based on a high power, CW, superconducting driver LINAC, delivering 5 mA of deuteron beams at 40 MeV (200 KW) directed on a C converter+ Uranium target and producing therefore more 10{sup 13} fissions/s. The expected radioactive beams intensities for exotic species in the mass range from A = 60 to A = 140, of the order of 10{sup 6} to 10{sup 10} pps will surpass by two order of magnitude any existing facilities in the world. These unstable atoms will be available at energies between few KeV/n to 15 MeV/n. The same driver will accelerate high intensity (100 {mu}A to 1 mA), heavier ions up to Ar at 14 MeV/n producing also proton rich exotic nuclei. In applied areas SPIRAL2 is considered as a powerful variable energy neutron source, a must to study the impact of nuclear fission and fusion on materials. The intensities of these unstable species are excellent opportunities for new tracers and diagnostics either for solid state, material or for radiobiological science and medicine. The 'Go' decision has been taken in May 2005. The investments and personnel costs amount to 190 Meuro, for the construction period 2006-2012. Construction of the SPIRAL2 facility is shared by ten French laboratories and a network of international partners. Under the 7FP program of European Union called 'Preparatory phase for the construction of new facilities', the SPIRAL2 project has been granted a budget of about 4Meuro to build up an international consortium around this new venture. The status of the construction of SPIRAL2 accelerator and technical R and D programs for physics instrumentation (detectors, spectrometers) in collaboration with EU and International partners will be presented.

Gales, S. [GANIL (DSM-CEA/IN2P3-CNRS) Blvd. Henri Becquerel, F-14076 Caen cedex (France)

2008-05-12T23:59:59.000Z

272

Complete LNG Terminal Status Maps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in North...

273

Training Work Group Status Overview - July 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview - July 2012 Training Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews More Documents &...

274

Training Work Group Status Overview - July 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2012 Training Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews More Documents & Publications Training Work Group Status...

275

NUCLEAR POWER IN CALIFORNIA: 2007 STATUS REPORT  

E-Print Network (OSTI)

........................................................................................................148 Potential Impact of a Centralized Interim Storage Facility Status and Implications of Centralized Interim Fuel Storage

276

Nuclear lattice simulations: Status and perspectives  

E-Print Network (OSTI)

I review the present status of nuclear lattice simulations. This talk is dedicated to the memory of Gerald E. Brown.

Meiner, Ulf-G

2013-01-01T23:59:59.000Z

277

BLM Approves Salt Wells Geothermal Plant in Churchill County | Open Energy  

Open Energy Info (EERE)

Plant in Churchill County Plant in Churchill County Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: BLM Approves Salt Wells Geothermal Plant in Churchill County Abstract Abstract unavailable. Author Mark Struble Published U.S. Department of the Interior- Bureau of Land Management, Carson City Field Office, Nevada, 02/13/2005 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for BLM Approves Salt Wells Geothermal Plant in Churchill County Citation Mark Struble. BLM Approves Salt Wells Geothermal Plant in Churchill County [Internet]. 02/13/2005. Carson City, NV. U.S. Department of the Interior- Bureau of Land Management, Carson City Field Office, Nevada. [updated 2005/02/13;cited 2013/08/21]. Available from: http://www.blm.gov/nv/st/en/info/newsroom/Carson_City_News_Archives/2005/02/blm_approves_salt.html

278

Platinum/Chromium-Based Stents Approved for Treatment of Peripheral Artery  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Platinum/Chromium-Based Stents Approved for Treatment of Peripheral Platinum/Chromium-Based Stents Approved for Treatment of Peripheral Artery Disease Platinum/Chromium-Based Stents Approved for Treatment of Peripheral Artery Disease November 14, 2012 - 12:00pm Addthis Washington, DC - A new stent that incorporates an innovative metal alloy developed by scientists at Boston Scientific Corporation and the U.S. Department of Energy (DOE) has received European approval for use in the treatment of certain peripheral arterial diseases. Initially developed for use as a coronary stent, the new PROMUS ELEMENT™ PLUS BTK drug-eluting stent system is designed for treatment of critical limb ischemia, a severe obstruction of arteries within the extremities which reduces blood flow and can damage tissues. Restoring and maintaining peripheral blood flow in

279

GRR/Elements/3-FD-b.12 - Make Recommendations to Approve or Deny...  

Open Energy Info (EERE)

| Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 3-FD-b.12 - Make Recommendations to Approve or Deny...

280

ADMF-016 Approved Vendor List 09_0903 EOTA - Business Form Document Title:  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Approved Vendor List 09_0903 6 Approved Vendor List 09_0903 EOTA - Business Form Document Title: Approved Vendor List (AVL) Document Number: ADMF-016 Rev. 09_0903 Document Owner: Approvers: Elizabeth Sousa Melissa Otero Backup Owner: Melissa Otero Referenced Documents: N/A Parent Document: Notify of Changes: ADMP-002 ADM,MGT 08_1118 Moved vendor to Do Not Use list. 09_0219 Updated vendors per VRT meeting. Moved another vendor to Do Not Use list. Revision History: Rev. Description of Change 08_1110 Intitial Release. ** Note: All Blanket Puchase Authorization Memos will be maintained on file in EOTA Suite 203 office 2. 09_0301 Added additional column to Vendors FY07-09 tab. Column indicates issuance of a Blanket Puchase Authorization Memo for regularly used vendors. Column will indicate that a Blanket Puchase Authorization Memo is on File. ** Cost (Rate/Hr) column removed from FY04-06 tab.

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

List of Custom/Others pending approval Incentives | Open Energy Information  

Open Energy Info (EERE)

Custom/Others pending approval Incentives Custom/Others pending approval Incentives Jump to: navigation, search The following contains the list of 769 Custom/Others pending approval Incentives. CSV (rows 1-500) CSV (rows 501-769) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active AEP (Central and North) - CitySmart Program (Texas) Utility Rebate Program Texas Commercial Industrial Institutional Local Government Schools Boilers Central Air conditioners Chillers Comprehensive Measures/Whole Building Custom/Others pending approval Energy Mgmt. Systems/Building Controls Furnaces Heat pumps Lighting Lighting Controls/Sensors Motor VFDs Motors Roofs Windows Yes AEP (Central and North) - Residential Energy Efficiency Programs (Texas) Utility Rebate Program Texas Construction

282

FDA Approves First Bionic Eye for the Blind | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FDA Approves First Bionic Eye for the Blind FDA Approves First Bionic Eye for the Blind FDA Approves First Bionic Eye for the Blind February 14, 2013 - 1:06pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON- The U.S. Department of Energy announced today that its support for a decade of revolutionary research has contributed to the creation of the first ever retinal prosthesis - or bionic eye - to be approved in the United States by the U.S. Food and Drug Administration for blind individuals with end-stage retinitis pigmentosa. "The development of the artificial retina is just one more example of the unique value of our National Laboratories and research universities," said Energy Secretary Steven Chu. "While no one can predict a breakthrough before it happens, the investments we're making in research

283

NSLS-II Proposal for Approval of Conceptual Design (CD-0)  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal for Approval of Conceptual Design (CD-0) CD0 cover This proposal is to construct and then operate a new National Synchrotron Light Source, NSLS-II, at Brookhaven National...

284

Notice of Office of Management and Budget Action to Approve with Change the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a New Collection for OE a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change as an emergency action for six months the Information Collection Request (ICR) for a new collection (Request for a new OMB Control Number) for OE Recovery Act Financial Assistance Grants. Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants More Documents & Publications Notice of Office of Management and Budget Action to Approve with Change the

285

Citizens' evaluation of the president and democratic transition : determinants and effects of presidential approval in Mexico  

E-Print Network (OSTI)

Level Presidential Approval in Mexico. . 85 2.1.Political Geography of State Politics in Mexico. . .88across the States of Mexico100 2.4. The Variation of

Gomez Vilchis, Ricardo Roman

2010-01-01T23:59:59.000Z

286

Status and Future of TRANSCOM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steve Casey Steve Casey U.S. Dept. of Energy Carlsbad Field Office  Current Program status g  Upcoming Changes  Glimpse at future options  DOE Commitments 2 6/3/2010 2  Current Program status g * Computer Based Training * User Support Site * Program Support * Program Accomplishments U i Ch  Upcoming Changes  Glimpse at future options  DOE Commitments 3  1 st release - December 2009 9  Covers general user training  Allows organizations access to training without waiting for a traditional class  Computer security module to be added Autumn 2010 Autumn 2010  Shipper/Scheduler training - being considered 4 6/3/2010 3  Completely overhauled in p y 2009  Features are user friendly  Layout more intuitive

287

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

288

Renewable Energy Requirement Status: 2005  

Science Conference Proceedings (OSTI)

The potential impacts of renewable portfolio standards (RPS) and other requirements are significant for electricity generation, transmission, and distribution companies, especially for those that depend on coal and other fossil fuels to supply the power delivered to their customers. this Technical Update is to update the information presented in the previous EPRI report, Renewable Energy Requirement Status and Compliance Strategies: 2004 (1008374, December 2004). Although the assessment focuses on state ...

2006-03-30T23:59:59.000Z

289

Gasification Technology Status - December 2011  

Science Conference Proceedings (OSTI)

This report addresses the worldwide market and technology status of gasification technologies. The market for gasification technologies is primarily in China, where national policy has established a major coal-to-chemicals industry and plans to add major coal-to-substitute natural gas and coal-to-liquid transportation fuels in the next five-year plan. Gasification is being deployed to a lesser extent in other Asian countries and elsewhere. Gasification technology companies have responded to this market b...

2011-12-30T23:59:59.000Z

290

Gasification Technology Status -- December 2008  

Science Conference Proceedings (OSTI)

Over the past 5 years, several major power companies have been developing and conducting detailed design studies of commercial-sized coal-based integrated gasification combined-cycle (IGCC) and pulverized coal (PC) projects. Integrated gasification combined-cycle (IGCC) plants can meet very stringent emissions targets, including those for mercury and CO2. This report covers current IGCC designs being offered and reviews the commercial status of gasification technologies, potential improvements, and lesso...

2008-12-18T23:59:59.000Z

291

Gasification Technology Status - December 2012  

Science Conference Proceedings (OSTI)

This report addresses the worldwide market and technology status of gasification technologies. The market for gasification technologies is primarily in China, where national policy has established a major coal-to-chemicals industry and plans to add major coaltosubstitute natural gas and coaltoliquid transportation fuels in the next five-year plan. Gasification is being deployed to a lesser extent in other Asian countries and elsewhere. Gasification technology companies ...

2012-12-31T23:59:59.000Z

292

Gasification Technology Status - December 2010  

Science Conference Proceedings (OSTI)

Several Integrated Gasification Combined Cycle (IGCC) projects that incorporate various degrees of CO2 Capture and Sequestration (CCS) are under development worldwide. This report covers current IGCC designs on offer that include CO2 capture and reviews the commercial status of gasification technologies, potential improvements, and lessons learned from commercial operating experience at IGCC plants. It describes and evaluates the considerable R&D program of the U.S. DOE and industrial companies to improv...

2010-12-31T23:59:59.000Z

293

Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Department of Energy Identity, Credential, and Access Management (ICAM) Cyber Security Training Conference Tuesday, May 18, 2010 Office of the Chief Information Officer 2 Announcement * LACS Birds-of-a-Feather Session - Logistics * Wednesday, May 19, 2010 * 9:30 AM - 11:30 AM EST * Room A708 - Focus: LACS ONLY! * LACS implementation experiences, lessons, questions, challenges, etc - Everyone is welcome * Science Identity Federation (Risk Management Track) - Logistics * Tuesday, May 18, 2010 * 4:00 PM - 5:00 PM EST * Room A704 - Focus * Ties into NSF/NIH InCommon Federation * Federated identity solution for Level 1 authentication Office of the Chief Information Officer 3 Slight Change of Focus Credential Issuance Facility Office of the Chief Information Officer 4 Paradigm Shift

294

Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(ICAM) will improve the security and interoperability of the Nuclear Security Enterprise (NSE)" * Cyber Security Governance Council Representatives - ICAM Governance model...

295

Status  

NLE Websites -- All DOE Office Websites (Extended Search)

9 FOIA - Request Log 9 FOIA - Request Log 1 Closed/ Date No. Dated Date Rec'd HQ or Dir. Subject Finalized 05/19/09 001 04/07/09 04/07/09 Direct Current contracts with Visionary Solutions, LLC and CAST Specialty Transportation Incorporated, for transportation services for the Waste Isolation Pilot Plant (WIPP) Finalized 06/30/09 002 06/29/09 06/29/09 Transfer DOE/HQ (1) All documents dated from February 2001 to the present relating or referring to any labor disputes that have delayed completion of federal construction projects costing $25 million or more during the time period referenced above. (2) All documents dated from February 2001 to the present relating or referring to any difficulties asserted by contractors in predicting labor cost and/or interruptions

296

Status  

NLE Websites -- All DOE Office Websites (Extended Search)

030310 002 030210 030210 Direct Requesting copies of Consultation and cooperative Agreement between the Department of Energy and the State of New Mexico with the...

297

DOE Workshop - Deposition Velocity Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delivering DOE's Vision for the Delivering DOE's Vision for the East Tennessee Technology Park Mission Safely Delivering the Department of Energy's Vision for the East Tennessee Technology Park Mission DOE Workshop Deposition Velocity Status Mike Hitchler, Manager Nuclear Facility Safety June 5, 2012 Safely Delivering DOE's Vision for the East Tennessee Technology Park Mission Existing UCOR Analyses * UCOR facilities at East Tennessee Technology Park (ETTP) and Oak Ridge National Laboratory (ORNL) use various plume models depending on when they were developed and by whom. - Some use MACCS or MACCS2 for dispersion evaluation. (~5 locations) - LLLW uses ingestion modeling (multiple locations)

298

Status of the LNG industry  

Science Conference Proceedings (OSTI)

A status report on the liquefied natural gas (LNG) industry after 22 years of international trade compares developments during 1984-1985 for the major exporting and importing countries. Japan, the leading consumer, imports over 72% of the world production, while Europe imports 27% and the US 1%. There are 10 baseload liquefaction plants with a collective capacity of about 230 million m/sup 3//streamday. Japan has 85% of the world's LNG storage facilities because its geology is not suitable for underground storage. Utilities are looking to LNG for peakshaving, but it will be necessary to time projects so that production and demand will develop a reliable trade climate. 3 tables.

Anderson, P.J.

1986-06-30T23:59:59.000Z

299

State building energy codes status  

Science Conference Proceedings (OSTI)

This document contains the State Building Energy Codes Status prepared by Pacific Northwest National Laboratory for the U.S. Department of Energy under Contract DE-AC06-76RL01830 and dated September 1996. The U.S. Department of Energy`s Office of Codes and Standards has developed this document to provide an information resource for individuals interested in energy efficiency of buildings and the relevant building energy codes in each state and U.S. territory. This is considered to be an evolving document and will be updated twice a year. In addition, special state updates will be issued as warranted.

NONE

1996-09-01T23:59:59.000Z

300

Status of Charm Flavor Physics  

E-Print Network (OSTI)

The role of charm in testing the Standard Model description of quark mixing and CP violation through measurements of lifetimes, decay constants and semileptonic form factors is reviewed. Together with Lattice QCD, charm has the potential this decade to maximize the sensitivity of the entire flavor physics program to new physics. and pave the way for understanding physics beyond the Standard Model at the LHC in the coming decade. The status of indirect searches for physics beyond the Standard Model through charm mixing, CP-violation and rare decays is also reported.

I. Shipsey

2006-07-26T23:59:59.000Z

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Relativistic Positioning Systems: current status  

E-Print Network (OSTI)

A {\\em relativistic positioning system} consists in a set of four clocks broadcasting their respective proper time by means of light signals. Among them, the more important ones are the {\\em auto-located positioning systems,} in which every clock broadcasts not only its proper time but also the proper times that it receives from the other three. At this level, no reference to any exterior system (the Earth surface, for example) and no synchronization are needed. The current status of the theory of relativistic positioning systems is sketched.

Bartolom Coll; Joan J. Ferrando; Juan A. Morales-Lladosa

2009-06-03T23:59:59.000Z

302

Foreign Obligations Implementation Status Presentation  

National Nuclear Security Administration (NNSA)

January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, Georgia Georgia Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop Foreign Obligations Implementation Status Brian G. Horn U.S. Nuclear Regulatory Commission January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 Crowne Plaza Ravinia Atlanta, GA Overview of Meeting Overview of Meeting * Review how the Obligation Tracking System is working * Presentations: - Review of Government notification procedures - Establishment of the beginning Obligation Balances for sites

303

Some Guidance on Applying for Approval for Other Uses of Phosphogypsum We refer to the information on this page as "some guidance" in recognition that we will continue  

E-Print Network (OSTI)

Some Guidance on Applying for Approval for Other Uses of Phosphogypsum We refer to the information questions about how to apply for approval of other uses for phosphogypsum. If you need guidance on a topic have EPA approval before you do anything with phosphogypsum. What do I have to do to obtain approval

304

Oil shale: Technology status report  

Science Conference Proceedings (OSTI)

This report documents the status of the US Department of Energy's (DOE) Oil Shale Program as of the end of FY 86. The report consists of (1) a status of oil shale development, (2) a description of the DOE Oil Shale Program, (3) an FY 86 oil shale research summary, and (4) a summary of FY 86 accomplishments. Discoveries were made in FY 86 about the physical and chemical properties and behavior of oil shales, process chemistry and kinetics, in situ retorting, advanced processes, and the environmental behavior and fate of wastes. The DOE Oil Shale Program shows an increasing emphasis on eastern US oil shales and in the development of advanced oil shale processing concepts. With the award to Foster Wheeler for the design of oil shale conceptual plants, the first step in the development of a systems analysis capability for the complete oil shale process has been taken. Unocal's Parachute Creek project, the only commercial oil shale plant operating in the United States, is operating at about 4000 bbl/day. The shale oil is upgraded at Parachute Creek for input to a conventional refinery. 67 refs., 21 figs., 3 tabs.

Not Available

1986-10-01T23:59:59.000Z

305

Order Module--DOE-STD-1104-2009, REVIEW AND APPROVAL OF NUCLEAR FACILITY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-STD-1104-2009, REVIEW AND APPROVAL OF NUCLEAR DOE-STD-1104-2009, REVIEW AND APPROVAL OF NUCLEAR FACILITY SAFETY BASIS AND SAFETY DESIGN BASIS DOCUMENTS Order Module--DOE-STD-1104-2009, REVIEW AND APPROVAL OF NUCLEAR FACILITY SAFETY BASIS AND SAFETY DESIGN BASIS DOCUMENTS The familiar level of this module is divided into two sections that are intended to provide only an overview of the material contained in DOE-STD-1104-2009, which should be consulted for complete information. The first section covers the introduction, applicability, and chapters 1 and 2. The second section covers chapters 3, 4, and 5. We have provided examples throughout the module to help familiarize you with the material. The examples will also help prepare you for the practice at the end of this module and for the criterion test.

306

Approved: 6-29-2010, Conduct of Operations, DOE O 422.1 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approved: 6-29-2010, Conduct of Operations, DOE O 422.1 Approved: 6-29-2010, Conduct of Operations, DOE O 422.1 Approved: 6-29-2010, Conduct of Operations, DOE O 422.1 1. PURPOSE. The objective of this Order is to define the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. A Conduct of Operations Program consists of formal documentation, practices, and actions implementing disciplined and structured operations that support mission success and promote worker, public, and environmental protection. The goal is to minimize the likelihood and consequences of human fallibility or technical and organizational system failures. Conduct of Operations is one of the safety management programs recognized in the Nuclear Safety Rule [Title 10

307

DOE P 420.1 Department of Energy Nuclear Safety Policy, Approved: 2-08-2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE P 420.1 Department of Energy Nuclear Safety Policy, Approved: DOE P 420.1 Department of Energy Nuclear Safety Policy, Approved: 2-08-2011 DOE P 420.1 Department of Energy Nuclear Safety Policy, Approved: 2-08-2011 PURPOSE: To document the Department of Energy's (DOE) nuclear safety policy. SCOPE: The provisions of this policy apply to all Departmental elements with responsibility for a nuclear facility, except the Naval Nuclear Propulsion Program, which is separately covered under Executive Order 12344, Title 50 United States Code, sections 2406 and 2511. This Policy cancels Secretary of Energy Notice 35-91, Nuclear Safety Policy, dated 9-9-91. POLICY: It is the policy of the Department of Energy to design, construct, operate, and decommission its nuclear facilities in a manner that ensures adequate protection of workers, the public, and the environment.

308

Processing Exemptions to Nuclear Safety Rules and Approval of Alternative Methods for Documented Safety Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STD-1083-2009 STD-1083-2009 June 2009 DOE STANDARD PROCESSING EXEMPTIONS TO NUCLEAR SAFETY RULES AND APPROVAL OF ALTERNATIVE METHODS FOR DOCUMENTED SAFETY ANALYSES U.S. Department of Energy AREA SAFT Washington D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document is available on the Department of Energy Technical Standards Program Web Page at http://www.hss.energy.gov/nuclearsafety/techstds DOE-STD-1083-2009 iii FOREWORD 1. This Department of Energy (DOE) Standard has been prepared by the Office of Quality Assurance Policy and Assistance to provide acceptable processes for: a. requesting and granting exemptions to DOE nuclear safety rules and b. requesting and approving alternate methodologies for documented safety analyses

309

Contractor Earned Value Management System Certification Status...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Centers Field Sites Power Marketing Administration Other Agencies You are here Home Contractor Earned Value Management System Certification Status Contractor Earned...

310

Estimating IPv6 & DNSSEC Deployment Status  

Science Conference Proceedings (OSTI)

Estimating IPv6 & DNSSEC External Service Deployment Status Background and Methodology. ... gov.two. Agency Two, (errors & islands). gov.three. ...

2013-11-07T23:59:59.000Z

311

Idle Reduction Technology Demonstrations: Status Report  

Science Conference Proceedings (OSTI)

DOE's Advanced Vehicle Testing Activity is sponsoring 3 idle reduction demonstration projects for heavy-duty trucks. This report provides the status of the projects.

Proc, K.

2004-11-01T23:59:59.000Z

312

Weekly Petroleum Status Report - Energy Information Administration  

U.S. Energy Information Administration (EIA)

DOE/EIA-0208(2012-104) Distribution Category UC-98 Data for Week Ended: December 28, 2012 Weekly Petroleum Status Report

313

Weekly Petroleum Status Report - Energy Information Administration  

U.S. Energy Information Administration (EIA)

DOE/EIA-0208(2013-17) Distribution Category UC-98 Data for Week Ended: April 26, 2013 Weekly Petroleum Status Report

314

Status & Direction for Onboard Hydrogen Storage  

NLE Websites -- All DOE Office Websites (Extended Search)

Economy Manufacturing for the Hydrogen Economy Status & Direction for Onboard Hydrogen Storage Andy Abele Quantum Fuel Systems Technologies Worldwide, Inc. July 2005 This...

315

Status of SAE Electro-Mobility Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

US-China Electric Vehicle and Battery Technology Workshop -Boston, MA Status of SAE Electro-Mobility Standards Peter Byk Technical Project Manager, Global Ground Vehicle Standards...

316

Status of State Electric Industry Restructuring Activity  

Reports and Publications (EIA)

Presents an overview of the status of electric industry restructuring in each state.. Restructuring means that a monopoly system of electric utilities has been replaced with competing sellers.

Channele Wirman

2010-09-01T23:59:59.000Z

317

Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Documents  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SENSITIVE DOE-STD-1104-2009 May 2009 Superseding DOE-STD-1104-96 DOE STANDARD REVIEW AND APPROVAL OF NUCLEAR FACILITY SAFETY BASIS AND SAFETY DESIGN BASIS DOCUMENTS U.S. Department of Energy AREA SAFT Washington, DC 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1104-2009 ii Available on the Department of Energy Technical Standards web page at http://www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE-STD-1104-2009 iii CONTENTS FOREWORD .................................................................................................................................. v INTRODUCTION ..........................................................................................................................

318

Status of current IPH applications  

SciTech Connect

The US Department of Energy has funded a series of field tests since 1977 to gain operational experience in the application of solar energy to industrial process heat requirements. To date, 34 design studies or actual installations have been funded utilizing technologies ranging from flat plates to line-focus concentrators to central receiver industrial systems. The types of solar systems include hot air, hot water, and steam production applied to a broad spectrum of industrial processes. The program elements are identified and put in perspective relative to transport fluid, temperature level, and size of the solar field. The status of these programs ranges from design studies to operational systems. Solar enhanced oil recovery and repowering have been studied. The chronological history of each program is tabulated. (LEW)

Kearney, D. W.

1981-03-01T23:59:59.000Z

319

ATLAS Status and latest results  

E-Print Network (OSTI)

The ATLAS experiment is a general-purpose detector located in one of the four interaction points of the Large Hadron Collider at CERN, Switzerland. In 2010 LHC has been colliding proton beams at the unprecedented centre-of-mass energy of 7 TeV. The last month of operation was dedicated to Pb-ion collisions at centre-of-mass energy of 2.76 TeV per nucleon. In this talk, a survey of the status of the ATLAS detector in both runs will be presented. The main results in pp collisions, including the study of minimum bias events, jets, W/Z, top and first searches for new physics will be reviewed. First results from heavy Ion collisions will be focussed on charged particle multiplicity, transverse energy, and elliptic flow as a function of collision geometry.

Sbarra, C; The ATLAS collaboration

2011-01-01T23:59:59.000Z

320

DOE-STD-1039-93; Guide to Good Practices for Control of Equipment and System Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-93 9-93 March 1993 CHANGE NOTICE NO. 1 December 1998 DOE STANDARD GUIDE TO GOOD PRACTICES FOR CONTROL OF EQUIPMENT AND SYSTEM STATUS U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. Change Notice No. 1 DOE-STD-1039-93 December 1998 Guide to Good Practices for Control of Equipment and System Status Page / Section

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Power, Status, and Learning in Organizations  

Science Conference Proceedings (OSTI)

This paper reviews the scholarly literature on the effects of social hierarchy---differences in power and status among organizational actors---on collective learning in organizations and groups. We begin with the observation that theories of organization ... Keywords: organizational and group learning, power and status, social hierarchy

J. Stuart Bunderson; Ray E. Reagans

2011-09-01T23:59:59.000Z

322

Neutrino oscillations present status and outlook  

E-Print Network (OSTI)

I summarize the status of three-flavour neutrino oscillations with date of Oct. 2007, and provide an outlook for the developments to be expected in the near future. Furthermore, I discuss the status of sterile neutrino oscillation interpretations of the LSND anomaly in the light of recent MiniBooNE results, and comment on implications for the future neutrino oscillation program.

Schwetz, Thomas

2008-01-01T23:59:59.000Z

323

Neutrino oscillations: present status and outlook  

E-Print Network (OSTI)

I summarize the status of three-flavour neutrino oscillations with date of Oct. 2007, and provide an outlook for the developments to be expected in the near future. Furthermore, I discuss the status of sterile neutrino oscillation interpretations of the LSND anomaly in the light of recent MiniBooNE results, and comment on implications for the future neutrino oscillation program.

Thomas Schwetz

2007-10-26T23:59:59.000Z

324

Neutrino oscillations: present status and outlook  

Science Conference Proceedings (OSTI)

I summarize the status of three-flavour neutrino oscillations with date of Oct. 2007, and provide an outlook for the developments to be expected in the near future. Furthermore, I discuss the status of sterile neutrino oscillation interpretations of the LSND anomaly in the light of recent MiniBooNE results, and comment on implications for the future neutrino oscillation program.

Schwetz, Thomas [Physics Department, Theory Division, CERN, CH-1211 Geneva 23 (Switzerland)

2008-02-21T23:59:59.000Z

325

Property:FacilityStatus | Open Energy Information  

Open Energy Info (EERE)

FacilityStatus FacilityStatus Jump to: navigation, search Property Name FacilityStatus Property Type String Description Status of the energy generation facility Allows Values Proposed;Under Construction;In Service;Decommissioned Pages using the property "FacilityStatus" Showing 25 pages using this property. (previous 25) (next 25) 3 3-D Metals + In Service + A AB Tehachapi Wind Farm + In Service + AFCEE MMR Turbines + In Service + AG Land 1 + In Service + AG Land 2 + In Service + AG Land 3 + In Service + AG Land 4 + In Service + AG Land 5 + In Service + AG Land 6 + In Service + AVTEC + In Service + Adair Wind Farm I + In Service + Adair Wind Farm II + In Service + Adams Wind Project + In Service + Aegir II + Proposed + Aero Turbine + In Service + Aeroman Repower Wind Farm + In Service +

326

MEDICAL EVACUATION DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited.  

E-Print Network (OSTI)

FM 4-02.2 May 2007 MEDICAL EVACUATION DISTRIBUTION RESTRICTION: Approved for public release, DC, 30 July 2009 MEDICAL EVACUATION 1. Change FM 4-02.2, 8 May 2007, as follows: Remove old pages-02.2 Department of the Army Washington, DC, 8 May 2007 MEDICAL EVACUATION Contents Page PREFACE

US Army Corps of Engineers

327

SF STATE Extended Learning SF State ABA Approved Academic Certificate Program  

E-Print Network (OSTI)

SF STATE Extended Learning 2013/2014 SF State ABA Approved Academic Certificate Program PARALEGAL STUDIES www.cel.sfsu.edu/paralegal/ "The program holds you to top standards: if you can succeed in it, you will be well prepared for paralegal work anywhere. For instance, I found the assignments to be very realistic

328

Approved by Graduate Council 2/22/06 Master of Arts in Teaching Program Proposal  

E-Print Network (OSTI)

employees of Truman State University are under no obligation to work with the MAT program unlessSB #4605 Approved by Graduate Council 2/22/06 1 Master of Arts in Teaching Program Proposal Truman, MO 63501 (660)785-6074 wsm@truman.edu Introduction The Master of Arts in Teaching (MAT) Program

Gering, Jon C.

329

Approved Authorizations and FirstinLine Pending Applications within Proposed Solar Energy Zones (SEZs) as of May 31, 2012  

E-Print Network (OSTI)

Approved Authorizations and FirstinLine Pending Applications within Proposed Solar Energy Zones 49884, Solar Reserve - Tower 4,000 Riverside East 147,910 9 approved 48880, Genesis - Trough 1 as reported in the Final Solar PEIS, July 2012. To convert acres to km2 , multiply by 0.004047. #12;

Argonne National Laboratory

330

Waste Isolation Pilot Plant Status and Plans - 2010 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant Status and Plans - 2010 More...

331

Environmental, energy and natural resources status report for the 101st Congress. Special report  

SciTech Connect

Contents: environmental, energy and natural resources status report for the 101st Congress; abandoned-mine fees passed in budget bill; cleanup effort and NRC fees boosted; other measures stall; Strategic Petroleum Reserve to grow to 1 billion barrels; circle of poison provisions cut in farm bill conference; congress clears landmark oil spill liability legislation; motor fuels tax tops massive debt reduction measure; Bush plans to sign massive clean air bill; global climate change bill passes at session end; lots of conservation provisions in farm bill; tongass bill moves; loggers and owls remain stalemated; major reform bills on parks, land fund and blm wither; coastal zone, great lakes, barrier bills beat deadline; modified tuna bill clears congress; Arizona, Alaska, Nevada wilderness bills approved; bills passed on asbestos, transport, waste reduction; bills passed on alternative power, low-income energy aid; numerous money bills clear Congress at the last minute; EPA-to-cabinet bill dies; DOD to fund environment research.

Not Available

1990-11-01T23:59:59.000Z

332

Field research tasks and technical services. Project status report, March 1-May 31, 1983  

DOE Green Energy (OSTI)

This status report covers progress on the two following areas: (1) Field Measurement, Analyses, and Reporting Related to Building Energy Systems and Biomass Projects. The key effort is on the Class B performance monitoring program, including a limited amount of special data evaluation and analysis. Other work relates to design tools, passive selection criteria, hot water performance documentation, and other renewable systems. (2) Technical Services in Support of Appropriate Technology Program. A total of 84 project files have been reviewed and summarized, telephone contacts and selected site visits are being made on a small number of active projects, and technical information dissemination tasks are underway. A summary paper on project activities was prepared and approved for publication.

Not Available

1983-06-01T23:59:59.000Z

333

Solar Neutrinos: Status and Prospects  

E-Print Network (OSTI)

We describe the current status of solar neutrino measurements and of the theory -- both neutrino physics and solar astrophysics -- employed in interpreting measurements. Important recent developments include Super-Kamiokande's determination of the neutrino-electron elastic scattering rate for 8B neutrinos to 3%; the latest SNO global analysis in which the inclusion of low-energy data from SNO I and II significantly narrowed the range of allowed values for the neutrino mixing angle theta12; Borexino results for both the 7Be and pep neutrino fluxes, the first direct measurements constraining the rate of ppI and ppII burning in the Sun; global reanalyses of solar neutrino data that take into account new reactor results on theta13; a new decadal evaluation of the nuclear physics of the pp chain and CNO cycle defining best values and uncertainties in the nuclear microphysics input to solar models; recognition of an emerging discrepancy between two tests of solar metallicity, helioseismological mappings of the soun...

Robertson, W C Haxton R G Hamish

2012-01-01T23:59:59.000Z

334

PEM Stack Manufacturing: Industry Status  

NLE Websites -- All DOE Office Websites (Extended Search)

© 2009 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED © 2009 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED JULY 2009 B U I L D I N G A C L E A N E N E R G Y G R O W T H C O M P A N Y B A L L A R D P O W E R S Y S T E M S PEM Stack Manufacturing: Industry Status Duarte R. Sousa, PE August 11, 2011 AUGUST 2009 P A G E 2 Overview of PEM Stack Manufacturing MEA Manufacturing Plate Manufacturing Stack Assembly Stack Conditioning and Testing Package and Ship For each of the four main processes, the following will be provided: 1. A brief history of where we have been; 2. Where we are today; 3. Where we would like to transition to; 4. Gaps and proposals. AUGUST 2009 P A G E 3 PEM Stack Manufacturing: Cost Overview * The MEA was readily identified as the major cost driver in a 10 kW stationary stack. * The precious metal catalyst electrode is the major cost driver for the MEA.

335

Training Work Group Status Overview - September 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2012 Training Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews More Documents & Publications Training Work...

336

Status Prospects of Green Data Center | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Prospects of Green Data Center Status Prospects of Green Data Center Information on energy-saving technology research of green data centers and the potential impacts....

337

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

338

Status and Future of TRANSCOM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Status Upcoming Changes Glimpse at Future Options DOE Commitments Status and Future of TRANSCOM More Documents & Publications Department of Energy Office of Science...

339

Microsoft Word - 10.15.2013 Status Report.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy Announcement Status Report, Updated 10152013 Vacancy Position PPSeriesGrade Organization Status Specialist DOE-NETL-13- DE-008 Chief Financial Officer & Business...

340

Cambodia-Status and Potential for the Development of Biofuels...  

Open Energy Info (EERE)

Cambodia-Status and Potential for the Development of Biofuels and Rural Renewable Energy Jump to: navigation, search Name Cambodia-Status and Potential for the Development of...

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Solar Neutrinos: Status and Prospects  

E-Print Network (OSTI)

We describe the current status of solar neutrino measurements and of the theory -- both neutrino physics and solar astrophysics -- employed in interpreting measurements. Important recent developments include Super-Kamiokande's determination of the neutrino-electron elastic scattering rate for 8B neutrinos to 3%; the latest SNO global analysis in which the inclusion of low-energy data from SNO I and II significantly narrowed the range of allowed values for the neutrino mixing angle theta12; Borexino results for both the 7Be and pep neutrino fluxes, the first direct measurements constraining the rate of ppI and ppII burning in the Sun; global reanalyses of solar neutrino data that take into account new reactor results on theta13; a new decadal evaluation of the nuclear physics of the pp chain and CNO cycle defining best values and uncertainties in the nuclear microphysics input to solar models; recognition of an emerging discrepancy between two tests of solar metallicity, helioseismological mappings of the sound speed in the solar interior, and analyses of the metal photoabsorption lines based on our best current description of the Sun's photosphere; a new round of standard solar model calculations optimized to agree either with helioseismology or with the new photospheric analysis; and, motivated by the solar abundance problem, the development of nonstandard, accreting solar models, in order to investigate possible consequences of the metal segregation that occurred in the proto-solar disk. We review this progress and describe how new experiments such as SNO+ could help us further exploit neutrinos as a unique probe of stellar interiors.

W. C. Haxton; R. G. Hamish Robertson; Aldo M. Serenelli

2012-08-28T23:59:59.000Z

342

Microsoft PowerPoint - SWL NERC status june 2009.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

* ER and EP - Awaiting final approval 4 Southwest Regional Compliance Team * Kansas City District Pete Hentschel * Tulsa District Rod Shank * Vicksburg District Dusty Wilson *...

343

Form Approved  

E-Print Network (OSTI)

! , i P_Oli re_r_in _.burden for th_s olJect_on of;nformatJon _s est_azec _ to averacje _ hot:r per respOnse, inc.iuding the time for rewew_ng insrructlons. _earchJ_g ex_stlng data sources, gathering and maintaining the data needed, and ompletlng and rev,ewlncj the tolled;on of m_,ormatlon. Send comments r,_,arding this burden estimate or any other aspect Of this

J. W. Campbell; George C. Marshall; Report Documentation; J. W. Campbell

1993-01-01T23:59:59.000Z

344

Approval Letter  

NLE Websites -- All DOE Office Websites (Extended Search)

It is with great pleasure that we award Brookhaven Women in Science the opportunity to train and develop a workshop to advance women in the science and engineering at Brookhaven...

345

Approved Experiments  

NLE Websites -- All DOE Office Websites (Extended Search)

Cycle 31OCT97 Exp Spokesperson Experiment Title Days 666 Clark Magnetic Rotation in 104Sn 5 667 Janssens Unsafe COULEX of the 240Pu Nucleus 3 670 Smith Exotic Structures in very...

346

Approved by  

E-Print Network (OSTI)

Reliability studies of systems have been an important area of research within electrical engineering for over a quarter of a century. In this thesis, the reliability analysis of the Supervisory Control And Data Acquisition (SCADA) systems used in offshore petroleum facilities was examined. This thesis presents fault trees for the platform production facilities, subsea control systems, a typical SCADA system, and the human induced fault tree. Software reliability was also studied. The fault trees were developed based on a safety flow chart and Process and Instrumentation Diagrams (P&ID). This work was conducted as a subcontract to the United States Department of the Interior, Mineral Management Service, Technology Assessment & Research Program, Program SOL 1435-01-99-RP-3995 (project no 356) to the University of Missouri-Rolla. Based on the fault tree diagrams and fault rates, the reliability of the SCADA system used in the offshore facilities was assessed. The failure availability of the SCADA system used in offshore platforms was also found. iv ACKNOWLEDGMENTS The author wishes to thank Dr. Kelvin. T. Erickson for his guidance and assistance not only in the preparation of this work, but also his valuable contributions in M.S. studies. The author sincerely appreciates the help and encouragement received from Dr. Eldon K. Stanek for the preparation and completion of this project. He was not only my supervisor, but also he was like a father throughout my stay at University of Missouri-Rolla. The author is thankful to Dr. Shari Dunn-Norman for her help in understanding

Egemen Kemal Cetinkaya; Kelvin T. Erickson; Egemen Kemal Cetinkaya

2001-01-01T23:59:59.000Z

347

Form Approved  

Gasoline and Diesel Fuel Update (EIA)

is a room with a flush toilet, bathtub or shower, and a sinkwashbasin with running water. A half-bath has at least a flush toilet or bathtub or shower, but does not have all...

348

Form Approved  

U.S. Energy Information Administration (EIA) Indexed Site

DISCLOSURE OF INFORMATION: The items RESPONDENT IDENTIFICATION Company Name and OTHER PARTY NAME (Item 1.A.), and SELLER'S NAME (Item 3.B.) on Form EIA-858 are DISCLOSURE OF INFORMATION: The items RESPONDENT IDENTIFICATION Company Name and OTHER PARTY NAME (Item 1.A.), and SELLER'S NAME (Item 3.B.) on Form EIA-858 are NOT considered confidential and may be publicly released in identifiable form. All other information you provide will be used for statistical purposes only. In accordance with the Confidential Information Protection provisions of Title V, Subtitle A of Public Law 107-347 and other applicable Federal laws, your responses will be kept confidential and will not be disclosed in identifiable form to anyone other than employees or agents without your consent. By law, every EIA employee, as well as every agent, is subject to a jail term, a fine of up to $250,000, or both if he or she discloses ANY identifiable information about you.

349

Form Approval:  

U.S. Energy Information Administration (EIA) Indexed Site

home cooling or air-conditioning costs? c. Help with other home energy costs? d. Emergency supplies, such as blankets, fans, portable heaters, or temporary emergency shelter?...

350

Status of Data Import into EIDR  

NLE Websites -- All DOE Office Websites (Extended Search)

Status of Data Import into EIDR February 10, 2007 This page describes data generated by ESPP that have been uploaded to LBNL (using Biofiles, EDR, or ftp), but that have not yet...

351

SNS Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS Operating Status Alerts SNS Operating Status Alerts Receive updates about the SNS beam status via text messages to your cell phone and/or e-mail by signing up here. The instrument hall coordinators will communicate any significant beam status changes including beam start, beam down, planned and unplanned outages, and unanticipated schedule changes such as delays. On the registration, enter your e-mail address to receive e-mail updates or to receive text messages enter the information below that is specific to your cell phone provider: Carrier Email to SMS Gateway Alltel [10-digit phone number]@message.alltel.com Example:1234567890@message.alltel.com AT&T (formerly Cingular) [10-digit phone number]@txt.att.net [10-digit phone number]@mms.att.net (MMS) [10-digit phone number]@cingularme.com

352

Status of Chemical Freeze-Out  

E-Print Network (OSTI)

The status of the energy dependence of the chemical freeze-out temperature and chemical potential obtained in heavy ion collisions is presented. Recent proposals for chemical freeze-out conditions are compared.

J. Cleymans; H. Oeschler; K. Redlich; S. Wheaton

2006-07-14T23:59:59.000Z

353

National Hydrogen Learning Demonstration Status (Presentation)  

DOE Green Energy (OSTI)

This presentation discusses U.S. DOE Learning Demonstration Project goals, fuel cell vehicle and H2 station deployment status, and technical highlights of vehicle and infrastructure analysis results and progress.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-02-01T23:59:59.000Z

354

Status of Heavy-lepton Searches  

DOE R&D Accomplishments (OSTI)

Searches for heavy leptons using e{sup +}e{sup -} annihilation, lepton-hadron collisions, photon-hadron collisions, hadron-hadron collisions, and studies of macroscopic matter are reviewed. The present experimental status and future possibilities are summarized.

Perl, M. L.

1981-06-00T23:59:59.000Z

355

Weekly Petroleum Status Report - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Weekly Petroleum Status Report/Energy Information Administration v U.S. crude oil refinery inputs averaged over 14.5 million barrels per day during the week ending ...

356

HFIR Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Operating Status of HFIR HFIR reactor building with sun and sky in background As of 13:19:50 10192013, Reactor Power is at 84 MW The reactor is currently operating at...

357

Machine Status | Argonne Leadership Computing Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Machine Status Science on Mira Cores Core Hours Atomistic Simulations of Nanoscale Oxides and Oxide Interfaces 65536 1297201.9256901 Lattice QCD 16384 28881.396622179 MockBOSS :...

358

status of the latest research and development  

NLE Websites -- All DOE Office Websites (Extended Search)

status of the latest research and development (R&D) activities. In status of the latest research and development (R&D) activities. In addition, the website, which is accessible from the NETL homepage, contains updated material on the program's Core R&D, Infrastructure, and Global Collaborations elements; a modified Frequently Asked Questions (FAQ) section; a section highlighting the National Carbon Sequestration Database and Geographic Information System

359

DOE F 13258e Etectromc Form Approved by Forms Mgml. 04119  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

e Etectromc Form Approved by Forms Mgml. 04119 e Etectromc Form Approved by Forms Mgml. 04119 12006 (08-89) United States Government Department of Energy Bonneville Power Administration memorandum DATE ; Cl 2 7 ZDac REPLY TO AnN OF: KEPR-Bell-l SUBJECT: Environmental Cleareance Memorandum TO : Larry Benzinger - TFSF-Bell Loren Cummings - TFSF-Bell TLM Foreman III TLM Foreman I Proposed Action: Construct landings and access roads in support of wood pole replacement activities along the Spirit Tap to Colville-Boundary #1 Transmission Line . PP&A Project No.: PP&A 1267 Budget Information: WO# 188846 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance/custodial services for buildings, structures , infrastructures (e .g., pathways, roads, and railroad s) and equipment

360

MEMORANDUM : APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A) : APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A) 2009-047 GRANTED FOR US SOLAR HOLDINGS LLC UNDER AGREEMENT NO. DE-FC36-08G018 155 US Solar Holdings LLC ("US Solar") has requested that the Department of Energy ("DOE") modify or clarify the cost share requirements set forth in the statement of considerations for the granted advance patent waiver W(A) 2009-047. Specifically, the statement of considerations, as originally granted, states the following: The total cost of the award is approximately $4 million with the Petitioner providing about 50% cost sharing. This waiver is contingent upon the Petitioner maintaining, in aggregate, the above cost sharing percentage over the course of the agreement. Rather than just provide an aggregate cost share requirement of 50% for the agreement, US Solar

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Review and Approval of Nuclear Facility Safety Basis Documents (Documented Safety Analyses and Technical Safety Requirements)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 1996 February 1996 CHANGE NOTICE NO. 2 Date November 2005 DOE STANDARD REVIEW AND APPROVAL OF NUCLEAR FACILITY SAFETY BASIS DOCUMENTS (DOCUMENTED SAFETY ANALYSES AND TECHNICAL SAFETY REQUIREMENTS) U.S. Department of Energy AREA SAFT Washington, DC 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, Fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Adminis tration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000.

362

File:Geothermal Lease Template - Approved 06-19-12.pdf | Open Energy  

Open Energy Info (EERE)

Lease Template - Approved 06-19-12.pdf Lease Template - Approved 06-19-12.pdf Jump to: navigation, search File File history File usage File:Geothermal Lease Template - Approved 06-19-12.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 793 KB, MIME type: application/pdf, 53 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 10:14, 16 August 2012 Thumbnail for version as of 10:14, 16 August 2012 1,275 × 1,650, 53 pages (793 KB) Dklein2012 (Talk | contribs)

363

Requirements for US regulatory approval of the International Thermonuclear Experimental Reactor (ITER)  

SciTech Connect

The International Thermonuclear Experimental Reactor (ITER) is the first fusion machine that will have sufficient decay heat and activation product inventory to pose potential nuclear safety concerns. As a result, nuclear safety and environmental issues will be much more important in the approval process for the design, siting, construction, and operation of ITER in the United States than previous fusion devices, such as the Tokamak Fusion Test Reactor. The purpose of this report is (a) to provide an overview of the regulatory approval process for a Department of Energy (DOE) nuclear facility; (b) to present the dose limits used by DOE to protect workers, the public, and the environment from the risks of exposure to radiation and hazardous materials; (c) to discuss some key nuclear safety-related issues that must be addressed early in the Engineering Design Activities (EDA) to obtain regulatory approval; and (d) to provide general guidelines to the ITER Joint Central Team (JCT) concerning the development of a regulatory framework for the ITER project.

Petti, D.A.; Haire, J.C.

1993-12-01T23:59:59.000Z

364

Directory of Certificates of Compliance for radioactive materials packages: Report of NRC approved packages. Volume 1, Revision 18  

SciTech Connect

The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volumes 1 and 2. An alphabetical listing by user name is included in the back of Volume 3 of approved QA programs. The reports include a listing of all users of each package design and approved QA programs prior to the publication date.

NONE

1995-10-01T23:59:59.000Z

365

INNOVATIONS IN NUCLEAR INFRASTRUCTURE AND EDUCATION (INIE) CONSORTIA - CURRENT STATUS  

SciTech Connect

This presentation discusses the current status of innovations in the Nuclear Infrastructure and Education (INIE) Consortia.

Fjeld, R.A.; Gutteridge, J.; Williamson, C.

2004-10-06T23:59:59.000Z

366

FTCP Senior Technical Safety Manager (STSM) Status Report  

Energy.gov (U.S. Department of Energy (DOE))

List of Senior Technical Safety Manager Positions, Base Requirements, Compensatory Measures and Qualification Status.

367

Current status of ForecastCurrent status of Forecast 2005 EPACT is in the model  

E-Print Network (OSTI)

1 1 Current status of ForecastCurrent status of Forecast 2005 EPACT is in the model 2007 Federal prices are being inputted into the model 2 Sales forecast Select yearsSales forecast Select years --Draft 0.53% Irrigation 2.76% Annual Growth Rates Preliminary Electricity ForecastAnnual Growth Rates

368

Impact of the CE mark approval on exit opportunities and validation for early stage medical device companies  

E-Print Network (OSTI)

The aim of this thesis was to look at the impact of acquiring the CE marking approval on the outcome of early stage medical device companies, specifically its impact on strategic acquisition opportunities and on valuation. ...

Kothari, Ashish (Ashish Shrikant)

2011-01-01T23:59:59.000Z

369

The relationship between minority statuses and prejudice  

E-Print Network (OSTI)

It is important to explore prejudice to understand and learn how to decrease it. There is a central belief that personal knowledge reduces prejudice. Does a person who has personal knowledge of prejudice, for example, those of minority status have less prejudice towards others? There has been considerable research on the prejudice that the majority might feel towards minorities but there is limited research on minorities prejudice towards others. The current study focuses on the relationship between a person of self-perceived minority statuses and her or his feelings of prejudice towards others (e.g. minorities and mainstream). Previous research had found a positive correlation between fundamentalism and prejudice. This study investigated that relationship and a positive correlation was found. Another aspect that has been studied in previous research, dealing with prejudice and self reports, is social desirability. This study investigated the relationship between social desirability and multiple minority statuses and no statistical significance was found. An analysis of variance (ANOVA) was utilized to investigate the relationship between multiple minority statuses and prejudice. The analysis showed no statistical significance on the relationship between multiple minority statuses and prejudice. There is still a lot about prejudice that remains unknown. This area of research should be investigated further to better understand minority prejudice, which in turn might lead us to overcome its negative effects.

Veve, Mia

2007-08-01T23:59:59.000Z

370

ARM - Value-Added Product Status Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Reports Status Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library Videos Publication Resources Submit a Publication Publishing Procedures ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications Value-Added Product Status Reports ARM Climate Research Facility Quarterly Value-Added Product Report July 1-September 30, 2013 (PDF, 1MB) ARM Climate Research Facility Quarterly Value-Added Product Report April 1-June 30, 2013 (PDF, 1MB) ARM Climate Research Facility Quarterly Value-Added Product Report January 1-March 31, 2013 (PDF, 268KB) ARM Climate Research Facility Quarterly Value-Added Product Report October 1-December 31, 2012 (PDF, 271KB) ARM Climate Research Facility Quarterly Value-Added Product Report

371

Renewables in India : Status and Future Potential  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewables in India : Status and Future Potential Renewables in India : Status and Future Potential Speaker(s): Luis Fernandes Date: July 9, 2007 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose We analyse the status and the trends in the growth of renewables in India. We propose a methodology linking micro-simulation to macro-modelling to obtain technical and economic potential estimates for solar water heaters in residential and commercial and biomass gasifiers for thermal applications in industry. We assess the sustainability of renewables based on the criteria of life cycle cost, net energy ratio, resource constraint and greenhouse gas emissions. The renewable based technologies seem to be sustainable based on all criteria, except the high life cycle cost. In some cases e.g. in wind and biomass based systems land availability may

372

Lab Status via Twitter | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab Status via Twitter Lab Status via Twitter Employees can be notified of changes to the laboratory's operations - for example, a delayed opening due to a heavy overnight snowfall - via the "Argonnestatus" account on Twitter. The account can be set to automatically send text messages to most mobile phones and PDAs. In addition to a short description of any changes in laboratory operations, messages may contain links to additional, detailed information. Only messages about changes in laboratory business hours will be sent. Most mobile communication devices can receive Twitter updates; instructions for receiving Argonne Status updates by phone are below. Any applicable text messaging charges from your provider are your responsibility. The Twitter Web site has basic information about the free online service.

373

ORISE: Voluntary Protection Program (VPP) Star Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Voluntary Protection Program (VPP) Star Status Voluntary Protection Program (VPP) Star Status Within the U.S. Department of Energy's (DOE) Voluntary Protection Program (VPP), there are three levels of recognition: STAR, MERIT and DEMONSTRATION. Contractors' programs that meet the requirements for outstanding safety and health programs, earn VPP STAR status-the highest achievement level. In December of 2003, the Oak Ridge Institute for Science and Education (ORISE) first earned STAR distinction following a comprehensive evaluation of its application for the VPP program. At that time, ORISE was just the 21st DOE site and the first in Tennessee to earn such exemplary recognition. In 2011 ORISE received its seventh consecutive Star of Excellence award. Today, ORISE is one of more than two dozen DOE sites to achieve VPP STAR

374

Synthetic fuels. Status of the Great Plains Coal Gasification Project, August 1, 1985  

Science Conference Proceedings (OSTI)

In December 1984, the Great Plains Gasification Associates had essentially finished constructing the nation's first commercial-scale coal gasification plant. As of July 31, 1985, Great Plains had contributed about $537 million in equity to the project and had borrowed $1.54 billion against a federal load guarantee made available by the Department of Energy (DOE). Since 1984 the project has faced deteriorating financial projections in the wake of declining energy prices. This is GAO's eighth semiannual report on Great Plains and covers the project's progress from January through August 1, 1985. GAO's objectives were to report on (1) the status of Great Plains' attempt to obtain additional federal financial assistance and (2) the status of the project's operational startup activities as of August 1, 1985. The Department of Energy Act of 1978 requires GAO to report on the status of the loan guarantee. Even though the Synthetic Fuels Corporation approved price guarantees in principle for Great Plains, DOE announced, on July 30, 1985, that it would not agree to restructuring its guaranteed loan. DOE rejected the proposed agreement, saying that it would not assure long-term plant operation at a reasonable cost to the taxpayers. The Great Plains sponsors then terminated their participation in the project on August 1, 1985, and defaulted on the $1.54 billion DOE-guaranteed loan. DOE directed the project administrator, ANG Coal Gasification Company, to continue plant operations pending a DOE decision about the project's future. DOE is assessing options including operating, leasing, selling, shutting down, mothballing, and scrapping the plant.

Bowsher, C.A.

1985-12-01T23:59:59.000Z

375

Manhattan Project: Final Approval to Build the Bomb, Washington, D.C.,  

Office of Scientific and Technical Information (OSTI)

President Roosevelt signs declaration of war with Japan, December 8, 1941. FINAL APPROVAL TO BUILD THE BOMB President Roosevelt signs declaration of war with Japan, December 8, 1941. FINAL APPROVAL TO BUILD THE BOMB (Washington, D.C., December 1942) Events > Difficult Choices, 1942 More Uranium Research, 1942 More Piles and Plutonium, 1942 Enter the Army, 1942 Groves and the MED, 1942 Picking Horses, November 1942 Final Approval to Build the Bomb, December 1942 Anxious as he was to get moving, Leslie Groves decided to make one final quality control check. On November 18, 1942, Groves appointed Warren K. Lewis of the Massachusetts Institute of Technology to head a final review committee, comprised of himself and three DuPont representatives. During the final two weeks of November, the committee traveled from New York to Chicago to Berkeley and back again through Chicago. It endorsed the work on gaseous diffusion at Columbia, though it made some organizational recommendations; in fact, the Lewis committee advocated elevating gaseous diffusion to first priority and expressed reservations about the electromagnetic program despite an impassioned presentation by Ernest Lawrence in Berkeley. Upon returning to Chicago, Crawford H. Greenewalt, a member of the Lewis committee, was present at Stagg Field when CP-1 (Chicago Pile #1) first went critical. (For more on CP-1, skip ahead to "Early Pile Design, 1942.") Significant as this moment was in the history of physics, it came after the Lewis committee endorsed moving piles to the pilot stage and one day after Groves instructed DuPont to move into pile design and construction.

376

What is the status of the Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

status of the Project? status of the Project? The first phase of the project was energized on July 20, 2006. It operated flawlessly as an integral part of National Grid's 35-kilovolt network in Albany, serving the equivalent of 25,000 homes. It was taken offline after nine months to begin phase II of the project: replacing a 30-meter section with 2G cable, which will be the world's first use of 2G in any utility device. Phase II of the project was energized on January 8, 2008.

377

Environment and safety research status report: 1993  

SciTech Connect

The 1993 status report discusses ongoing and planned research activities in the GRI Environment and Safety Program. The objectives and goals, accomplishments, and strategy along with the basis for each project area are presented for the supply, end use, and gas operations subprograms. Within the context of these subprograms, contract status summaries under their conceptual titles are given for the following project areas: Gas Supply Environmental and Safety Research, Air Quality Research, End Use Equipment Safety Research, Gas Operations Safety Research, Liquefied Natural Gas, Safety Research, and Gas Operations Environmental Research.

Not Available

1993-03-01T23:59:59.000Z

378

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

379

Indonesia and Climate Change: Current Status and Policies | Open Energy  

Open Energy Info (EERE)

and Climate Change: Current Status and Policies and Climate Change: Current Status and Policies Jump to: navigation, search Name Indonesia and Climate Change: Current Status and Policies Agency/Company /Organization World Bank, Department for International Development Indonesia Sector Energy, Land Focus Area Renewable Energy, Forestry, Agriculture Topics Policies/deployment programs, Background analysis Resource Type Publications Website http://siteresources.worldbank Country Indonesia South-Eastern Asia References Indonesia and Climate Change: Current Status and Policies[1] Background References ↑ "Indonesia and Climate Change: Current Status and Policies" Retrieved from "http://en.openei.org/w/index.php?title=Indonesia_and_Climate_Change:_Current_Status_and_Policies&oldid=328842

380

CDF Status and B Physics Prospects  

Science Conference Proceedings (OSTI)

With extensive upgrades to the detector and electronics, CDF has started collecting data with Run II of the Tevatron. The enhanced silicon coverage and the use of silicon based tracks in the trigger, make CDF well suited for a broad program of B hadron measurements. We present the current status of the experiment and prospects for measurements in Run II.

J. Stephen Miller

2002-10-07T23:59:59.000Z

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

The National Storage Laboratory: Overview and status  

Science Conference Proceedings (OSTI)

The National Storage Laboratory (NSL) was organized to investigate, demonstrate, and commercialize high-performance hardware and software storage technologies that promise to remove network computing bottlenecks and provide critically needed new storage systems functionality. This paper briefly outlines the goals, collaboration and current status of the NSL.

Watson, R.W.; Coyne, R.

1994-01-19T23:59:59.000Z

382

Status of IFR fuel cycle demonstration  

SciTech Connect

The next major step in Argonne`s Integral Fast Reactor (IFR) Program is demonstration of the pyroprocess fuel cycle, in conjunction with continued operation of EBR-II. The Fuel Cycle Facility (FCF) is being readied for this mission. This paper will address the status of facility systems and process equipment, the initial startup experience, and plans for the demonstration program.

Lineberry, M.J.; Phipps, R.D.; McFarlane, H.F.

1993-09-01T23:59:59.000Z

383

Fuel Cell Technology Status - Voltage Degradation (Presentation)  

DOE Green Energy (OSTI)

This presentation describes an independent assessment of fuel cell durability status and discusses the project's relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; the FY12 technical accomplishments including the fourth annual publication of results; and project collaborations and future work.

Kurtz, J.; Wipke,; Sprik, S.; Saur, G.

2012-06-01T23:59:59.000Z

384

Solar Photovoltaics development -Status and perspectives  

E-Print Network (OSTI)

Solar Photovoltaics development - Status and perspectives Jørgen Fenhann Risø National Laboratory for the development of solar photovoltaics, contributing to the Macro Task E1 on production cost for fusion.S. with 53 MWp followed by Japan and EU. Until now off-grid installation have dominated the solar PV market

385

Research Portals: Status Quo and Improvement Perspectives  

Science Conference Proceedings (OSTI)

Research portals are a means to present, discuss, and advance scientific findings. They are web-based knowledge management tools for research communities. Research portals foster collaboration among a community of scientists, research funders, and political ... Keywords: Knowledge Management, Maturity Model, Research Community, Research Dissemination, Research Portal, Status Quo Analysis

Jrg Becker; Ralf Knackstedt; Lukasz Lis; Armin Stein; Matthias Steinhorst

2012-07-01T23:59:59.000Z

386

LLNL-PRES-407935 Mirror Status Workshop  

E-Print Network (OSTI)

LLNL-PRES-407935 Mirror Status Workshop September 8-9, 2008 Lawrence Berkeley National Laboratory; #12; #12; #12;LLNL-PRES-406923 Comments-9 September 2008 R. F. Post, LLNL MW08-01 #12;The Kinetic Stabilizer concept allows the use of axisymmetric

387

Electricity from Renewables: Status, Prospects, and Impediments  

E-Print Network (OSTI)

Electricity from Renewables: Status, Prospects, and Impediments America's Energy Future Study Panel on Electricity from Renewables K. John Holmes, National Research Council, Study Director (jholmes@nas.edu) #12, Carnegie Mellon University ·James J. Markowsky***, American Electric Power (Ret.) ·Richard A. Meserve

Kammen, Daniel M.

388

Experiments Approved at the May 20-21, 2005 ATLAS PAC Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Priority I Experiments Approved at the May 20-21, 2005 ATLAS PAC Meeting Priority I Experiments Approved at the May 20-21, 2005 ATLAS PAC Meeting Proposal # PI Name Title Days 1036-2 S. Williams High Spin States in the T = 3/2 Mirror Nuclei 37Ca and 37Cl, and the T = 1/2 Mirror Nuclei 37K and 37Ar 4 1050-2 M.A.Bentley High Spin States in the N=Z-3 Nucleus 49Fe - Coulomb Effects at Large Proton Excess 6 1078-2 N. Scielzo Production of 14O for Future Measurements with the Advanced Penning Trap and Precision Measurement of the Q-Value of the Superallowed Branch 7 1085 T. Ahn Identification of the mixed-symmetry one-phonon 2+{1,ms} state of 136Ce and 134Xe in inverse-kinematics Coulomb excitation 2 1086 A. H. Wuosmaa Study of excited states in 7He through the d(8Li,3He)7He reaction 6 1088X A. H. Wuosmaa Development of a 10C Beam 2

389

Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada  

SciTech Connect

This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or clean, building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, Final Status Survey Plan for Corrective Action Unit 117 Pluto Disassembly Facility, Building 2201) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a Non-Impacted Class which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into survey units and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three Class 1, four Class 2, and one Class 3 survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the buildings interior, Building 2201 may be considered radiologically clean, or free of contamination.

Jeremy Gwin and Douglas Frenette

2010-09-30T23:59:59.000Z

390

White Paper on Energy Efficiency Status of Energy-Using Products in China (2011)  

E-Print Network (OSTI)

Standardization. White Paper Energy Efficiency Status ofbased on the White Paper - Energy Efficiency Status oftransformer). In White Paper Energy Efficiency Status of

Zhou, Nan

2013-01-01T23:59:59.000Z

391

White Paper on Energy Efficiency Status of Energy-Using Products in China (2012)  

E-Print Network (OSTI)

and others. White Paper Energy Efficiency Status ofand others. White Paper Energy Efficiency Status ofL ABORATORY White Paper on Energy Efficiency Status of

Zhou, Nan

2013-01-01T23:59:59.000Z

392

Clean Energy Policy Analyses: Analysis of the Status and Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Energy Policy Analyses: Analysis of the Status and Impact of Clean Energy Policies at the Local Level Clean Energy Policy Analyses: Analysis of the Status and Impact of Clean...

393

Status of DOE Research Efforts in Gas Hydrates | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status of DOE Research Efforts in Gas Hydrates Status of DOE Research Efforts in Gas Hydrates July 30, 2009 - 1:38pm Addthis Statement of Dr. Ray Boswell, National Energy...

394

Status report on the Advanced Light Source control system  

SciTech Connect

This paper is a status report on the ADVANCED LIGHT SOURCE (ALS) control system. The current status, performance data, and future plans will be discussed. Manpower, scheduling, and costs issues are addressed.

Magyary, S.; Chin, M.; Fahmie, M.; Lancaster, H.; Molinari, P.; Robb, A.; Timossi, C.; Young, J.

1991-11-11T23:59:59.000Z

395

Reagent Storage and Handling for SCR and SNCR Systems  

Science Conference Proceedings (OSTI)

As utilities move to post-combustion nitrogen oxides (NOx) control technologies, the need to understand reagent storage and handling requirements for these systems increases. This report reviews various approaches to the storage and handling of anhydrous ammonia, aqueous ammonia, and urea. Systems that convert urea to ammonia also are included.

2002-05-30T23:59:59.000Z

396

Laboratory technologies ENDURE(tm) SCR Catalyst and Hyperion...  

NLE Websites -- All DOE Office Websites (Extended Search)

Patrick McClure, uses the energy of low-enriched uranium fuel and meets all the non-proliferation criteria of the Global Nuclear Energy Partnership. Each unit will produce 70...

397

The Sensors and Controls Research (SCR) Group conceives, designs,  

E-Print Network (OSTI)

, and solving multidisciplinary measurement problems, SST has a long history of innovation and commercialization depicts a laser scanning system that was developed and commercialized for safeguards and security, including biology, chemistry, mechanics, materials, condensed mater science, environmental sciences

398

Review and status of maglev in the United States  

DOE Green Energy (OSTI)

This report contains a slide show on the status and future of Maglev type transportation systems in the United States.

Coffey, H.T.

1993-12-31T23:59:59.000Z

399

Retail Unbundling status for Michigan - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Retail Unbundling- Michigan. Status: The state has begun the process of implementing comprehensive unbundling programs for its residential gas customers.

400

ARM - ARM Instrumentation Status: New, Current, and Future  

NLE Websites -- All DOE Office Websites (Extended Search)

Instrumentation Status: New, Current, and Future Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information...

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

FCV Learning Demonstration: Project Midpoint Status and Fall 2007 Results  

DOE Green Energy (OSTI)

Status reoprt on NREL's fuel cell vehicle learning demonstration presented at the 2007 EVS-23 meeting in Anaheim, CA.

Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

2007-12-01T23:59:59.000Z

402

Retail Unbundling status for the state of New York  

U.S. Energy Information Administration (EIA)

Retail Unbundling - New York. Status: The state has comprehensive unbundling programs for its residential gas customers. Overview: Natural gas ...

403

Wind Power Technology Status and Performance and Cost Estimates - 2009  

Science Conference Proceedings (OSTI)

This report provides an update on the status and cost of wind power technology based on the Wind Power Technology Status and Performance and Cost Estimates 2008 (EPRI report 1015806). It addresses the status of wind turbine and related technology for both onshore and offshore applications and the performance and cost of onshore wind power plants.

2009-11-20T23:59:59.000Z

404

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

405

User Agreement and Proprietary Account Status  

NLE Websites -- All DOE Office Websites (Extended Search)

User Agreement and Proprietary Account Status (04-Oct-2013) User Agreement and Proprietary Account Status (04-Oct-2013) Listed below are the 562 institutions that have signed APS User Agreements as financially contributing CAT members (indicated by CAT acronyms) and/or as non-members (indicated by "GU") as of (04-Oct-2013). A CAT Agreement covers users' activities at that CAT's beam lines; a GU Agreement covers users' activities at any APS beam line. All listed Agreements are nonproprietary unless otherwise noted. A superscript p indicates that a proprietary User Account has also been established. If you are not an ANL employee, a User Agreement signed by your home institution is a prerequisite for hands-on work at the APS. If your institution is not listed below (or if your institution is listed but a

406

Status and Impact of State MTBE Bans  

Gasoline and Diesel Fuel Update (EIA)

Status and Impact of State MTBE Bans Status and Impact of State MTBE Bans Background As a result of the Clean Air Act Amendments of 1990 (CAAA90), the year-round use of reformulated gasoline (RFG) has been required in cities with the worst smog problems since 1995 (Figure 1). One of the requirements of RFG specified by CAAA90 is a 2- percent oxygen requirement, which is met by blending "oxygenates," 1 including methyl tertiary butyl ether (MTBE) and ethanol, into the gasoline. MTBE is the oxygenate used in almost all RFG outside of the Midwest. Ethanol is currently used in the Midwest as an oxygenate in RFG and as an octane booster and volume extender in conventional gasoline. Several years ago, MTBE was detected in water supplies scattered throughout the country, but predominantly in areas using RFG. MTBE from RFG was apparently

407

July 2012, Training Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. 4. June 20 - 21. Hosted HAMMER to develop Radworker Reciprocity Program Checklist. 5. July 10-11. HSS Focus Group Training Working Group and Subcommittee meetings at NTC. Upcoming Meetings: Boardman meeting with HAMMER week of July 29.

408

MMCR Upgrades: Present Status and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

409

September 2012, Training Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7-8. Attended NIEHS Trainer's Exchange in Oak Ridge. 2. May 8-9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker pilot. Entities visited included ORISE, Y-12, DOE TRU Project, and local labor entities. 3. June 19-20. Participated with Char Wells, Sandia National Laboratory Training Manager, (NTC, NIEHS and HAMMER in attendance) at a DOE M&O contractor led Learning/Training Workshop. - Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. - Serving this group as data repository and communications hub for efforts to standardize General Employee Radiation Training (GERT) within DOE. - Briefed the complex wide Radworker reciprocity concept finding interest and

410

Fossil energy waste management. Technology status report  

SciTech Connect

This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includes a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.

Bossart, S.J.; Newman, D.A.

1995-02-01T23:59:59.000Z

411

Lab obtains approval to begin design on new radioactive waste staging  

NLE Websites -- All DOE Office Websites (Extended Search)

New radioactive waste staging facility New radioactive waste staging facility Lab obtains approval to begin design on new radioactive waste staging facility The 4-acre complex will include multiple staging buildings plus an operations center and a concrete pad for mobile waste characterization equipment. September 1, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

412

Natural Gas Vehicles: Status, Barriers, and Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

ESD/10-4 ESD/10-4 Natural Gas Vehicles: Status, Barriers, and Opportunities Energy Systems Division About Argonne National Laboratory Argonne is a U.S. Department of Energy laboratory managed by UChicago Argonne, LLC under contract DE-AC02-06CH11357. The Laboratory's main facility is outside Chicago, at 9700 South Cass Avenue, Argonne, Illinois 60439. For information about Argonne and its pioneering science and technology programs, see www.anl.gov.

413

Status Update: Closing Rocky Flats by 2006  

SciTech Connect

Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

Tuor, N.; Schubert, A.

2003-02-25T23:59:59.000Z

414

Status Assessment of Cadmium Telluride Photovoltaic Technology  

Science Conference Proceedings (OSTI)

Thin-film cadmium telluride (CdTe) solar cells are the basis of a potentially significant technology for commercial solar-energy production. This report provides a description of laboratory- and commercial-scale CdTe thin-film technologies and their status with respect to both present performance and understanding of ultimate technology limitations. Small laboratory-scale cells have achieved efficiencies over 16%, while larger monolithic thin-film modules have demonstrated over 11% efficiency and long-te...

2004-01-12T23:59:59.000Z

415

Gasification Users Association - Technology Status - December 2011  

Science Conference Proceedings (OSTI)

This report addresses the worldwide market and technology status of gasification technologies. The market for gasification technologies is primarily in China where national policy has established a major coal-to-chemicals industry and plans to add major plants for coal-to-substitute natural gas (SNG) and coal-to-liquid transportation fuels in the next five-year plan. Gasification is also being deployed to some extent in other Asian countries (for example, Korea and India) and elsewhere. Gasification tech...

2011-12-30T23:59:59.000Z

416

Gasification Users Association: Technology Status - December 2012  

Science Conference Proceedings (OSTI)

This report addresses the worldwide market and technology status of gasification technologies. The market for gasification technologies is primarily in China, where national policy has established a major coaltochemicals industry and plans to add major coaltosubstitute natural gas and coaltoliquid transportation fuels in the next five-year plan. Gasification is being deployed to a lesser extent in other Asian countries and elsewhere. Gasification technology ...

2012-12-31T23:59:59.000Z

417

Status of SOFC development in USA  

DOE Green Energy (OSTI)

Solid oxide fuel cells represent a highly efficient power generation/cogeneration source in the United States and worldwide. Currently, the US is a leader in this technology in the tubular, monolithic and planar solid oxide fuel cell areas. In addition, research is being conducted in intermediate temperature solid oxide fuel cells. An overview of the status of these technologies, research, and critical issues is presented.

Hooie, D.T.

1993-06-01T23:59:59.000Z

418

The status of fuel cell technology  

DOE Green Energy (OSTI)

This brief status report provides an introduction to what fuel cells are, why they are important, what uses have been made of them to date, the goals and timetables of current programs, and who the players are in this vital technology. Copies of most of the slides presented and additional diagrams are appended to this paper. Further details can be obtained from the comprehensive texts cited in the bibliography. 11 refs., 44 figs.

O'Sullivan, J.B.

1991-02-20T23:59:59.000Z

419

Propane Vehicles: Status, Challenges, and Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

Propane Vehicles: Propane Vehicles: Status, Challenges, and Opportunities ANL/ESD/10-2 Energy Systems Division Availability of This Report This report is available, at no cost, at http://www.osti.gov/bridge. It is also available on paper to the U.S. Department of Energy and its contractors, for a processing fee, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62

420

Consumer approval of genetic modification of food products: a comparison of United States and South Korean perspectives  

E-Print Network (OSTI)

Genetic modification presents the potential to advance not only agricultural production but to increase quality of life as well. The potential this innovation presents will be irrelevant if the public is unwilling to accept and adopt it. The following study examines public perceptions of biotechnology, specifically the consumer approval of genetically modified food products. This study was based on data collected from a national survey conducted in both the United States and South Korea. The United States survey was designed to be nationally representative and consisted of 1201 respondents. The South Korean survey was also designed to be nationally representative and consisted of 1054 respondents Analysis was conducted using two questions from the survey questionnaire as dependent variables: (1) approval of the use of genetic modification in the creation of plant-based food products, and (2) approval of the use of genetic modification in the creation of animal-based food products. This study utilized probit models for binary choice and ordered probit models to analyze the likelihood of consumer approval of the use of genetic modification for the creation of food products. Findings indicated that consumers in the U.S. and South Korea who possessed an accurate knowledge of the applications and outcomes of GM technology were more likely to approve of its use for the creation of foods than those who had inaccurate or no knowledge of the technology. Additionally, the majority of consumers in the U.S. and South Korea believe that GM foods should be labeled as such. Those consumers who felt GM labeling to be necessary were less likely to approve of the GM of foods than those who did not feel GM labeling to be necessary. It was also found that consumers in both countries are less approving of the GM of animals than the GM of plants. Consumer approval of the use of genetic modification in the creation of food products can be increased with proper education that provides accurate knowledge of the applications of GM. Labeling of GM products is likely to result in a decrease in demand, which may be offset by public educational campaigns.

Gillett, Mary Caperton

2003-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Alternative Fuels Data Center: Status Update: Clarification of Ethanol  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Clarification of Ethanol Certification Limits for Legacy Equipment Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Google Bookmark Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Delicious Rank Alternative Fuels Data Center: Status Update: Clarification of

422

Outreach and Collaboration Program Status and Accomplishments 2008-2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Status and Accomplishments Program Status and Accomplishments 2008-2009 Outreach and Collaboration Program Status and Accomplishments 2008-2009 Outreach and Collaboration has helped HSS expand the DOE's sphere of communication and influence through broad-based dialogues, cultivating productive interagency relationships, and collaborative overtures to external entities - public and private alike - whose interests and goals align with HSS and DOE mission. This status report highlights the characteristics and accomplishments of the four outreach and collaboration programs, each of which exists to support and sustain the DOE mission of "Discovering the solutions topower and secure America's future". Outreach and Collaboration Program Status and Accomplishments 2008-2009 More Documents & Publications

423

Alternative Fuels Data Center: Status Update: E85 Dispenser System  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

E85 E85 Dispenser System Certified (June 2010) to someone by E-mail Share Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Facebook Tweet about Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Twitter Bookmark Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Google Bookmark Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Delicious Rank Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Digg Find More places to share Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on AddThis.com... Status Update: E85 Dispenser System Certified (June 2010)

424

Alternative Fuels Data Center: Status Update: Requirements Have Not Changed  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Requirements Have Not Changed (June 2008) to someone by E-mail Requirements Have Not Changed (June 2008) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Google Bookmark Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Delicious Rank Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Digg Find More places to share Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on AddThis.com... Status Update: Requirements Have Not Changed (June 2008)

425

Test Procedure for 170.302.h Incorporate Laboratory Test Results APPROVED Version 1.1 September 24, 2010  

E-Print Network (OSTI)

Test Procedure for §170.302.h Incorporate Laboratory Test Results APPROVED Version 1.1 September 24, 2010 1 Test Procedure for §170.302 (h) Incorporate Laboratory Test Results This document describes the test procedure for evaluating conformance of complete EHRs or EHR modules1

426

Approved For Public Release; Distribution Is Unlimited Prepared for Headquarters, U.S. Army Corps of Engineers.  

E-Print Network (OSTI)

The contents of this report are not to be used for advertising, publication, or promotional purposes. Citation of trade names does not constitute an official endorsement or approval of the use of such commercial products. ta PRINTEDON IUX!YCIED PAPERInstallation Restoration Research Program Technical Report IRRP-94-I

R. Mark Bricks; Clint W. Williford; Larry W. Jones; R. Mark Bricks; Clint W. Wllliford; Larry W. Jones

1994-01-01T23:59:59.000Z

427

Form Approved Through 9/30/2007 OMB No. 0925-0001 Department of Health and Human Services  

E-Print Network (OSTI)

Form Approved Through 9/30/2007 OMB No. 0925-0001 Department of Health and Human Services Public Health Services Review Group Type Activity Grant Number Total Project Period From: Through: Requested, SERVICE, LABORATORY, OR EQUIVALENT 5. TITLE AND ADDRESS OF ADMINISTRATIVE OFFICIAL 2d. MAJOR SUBDIVISION E

Wisconsin at Madison, University of

428

Form Approved Through 6/30/2012 OMB No. 0925-0001 Department of Health and Human Services  

E-Print Network (OSTI)

Form Approved Through 6/30/2012 OMB No. 0925-0001 Department of Health and Human Services Public Health Services Grant Application Do not exceed character length restrictions indicated. LEAVE BLANK) E-MAIL ADDRESS: 3e. DEPARTMENT, SERVICE, LABORATORY, OR EQUIVALENT 3f. MAJOR SUBDIVISION 3g

Wisconsin at Madison, University of

429

Advanced Standing Unit Credits (Unit Exemptions) * see overleaf, if not approved, Theme Leader/ALU to provide a reason  

E-Print Network (OSTI)

Advanced Standing Unit Credits (Unit Exemptions) * see overleaf, if not approved, Theme Leader/ALU to provide a reason Advanced Standing Unit Level (Unspecified Credit - Applies to Higher Education Only based CDU Units for which Credit is sought Unit title Institution Year Result Course Level Unit Code

430

Status of photovoltaic concentrator modules and systems  

DOE Green Energy (OSTI)

Several leading line- and point-focus photovoltaic concentrator system development programs are reviewed, including those by ENTECH, SEA Corporation, AMONIX, and Alpha Solarco. Concentrating collectors and trackers are gaining maturity and reaching product status as designs are made more manufacturable and reliable. Utilities are starting to take notice of this emerging technology, and several privately-funded utility installations are underway. Several advantages are offered by concentrators, including low system and capital cost and rapid production ramp-up. These are discussed along with issues generally raised concerning concentrator technology.

Maish, A.B.

1994-04-01T23:59:59.000Z

431

Status and Commissioning of the CMS Experiment  

E-Print Network (OSTI)

After a brief overview of the Compact Muon Solenoid (CMS) experiment, the status of construction and installation is described in the first part of the note. The second part of the document is devoted to a discussion of the general commissioning strategy of the CMS experiment, with a particular emphasis on trigger, calibration and alignment. Aspects of b-physics, as well as examples for early physics with CMS are also presented. CMS will be ready for data taking in time for the first collisions in the Large Hadron Collider (LHC) at CERN in late 2007.

O. Buchmueller; F. -P. Schilling

2007-01-11T23:59:59.000Z

432

Status of the intense pulsed neutron source  

Science Conference Proceedings (OSTI)

IPNS is not unique in having concerns about the level of funding, and the future looks good despite these concerns. This report details the progress made at IPNS during the last two years. Other papers in these proceedings discuss in detail the status of the enriched uranium Booster target, the two instruments that are under construction, GLAD and POSY II, and a proposal for research on an Advanced Pulsed Neutron Source (ASPUN) that has been submitted to the Department of Energy (DOE). Further details on IPNS are available in the IPNS Progress Report 1987--1988, available by writing the IPNS Division Office. 9 refs., 3 tabs.

Brown, B.S.; Carpenter, J.M.; Crawford, R.K.; Rauchas, A.V.; Schulke, A.W.; Worlton, T.G.

1988-01-01T23:59:59.000Z

433

Solar Photovoltaics: Status, Costs, and Trends  

Science Conference Proceedings (OSTI)

This White Paper addresses the history, status, and trends of flat-plate solar photovoltaic power technologies in both crystalline silicon and thin-film forms. Perspectives are provided on the cost and performance, as well as, the materials used for producing PV modules. The major milestones and trends in PV power system development are described, looking back to the 1970's, and forward to the next 30 years. Current incentives and policies are also discussed with focus on utility engagement in PV power. ...

2009-12-31T23:59:59.000Z

434

Current status of the RERTR Program  

SciTech Connect

The main purpose of this paper is to review the progress which has been accomplished by the RERTR Program during the past year, the present status of the program, the activities which are now in progress, and the program plans for the coming years. The changes that have taken place in the overall program plan are, in themselves, not very significant. Some activities were found to be somewhat more difficult than expected and required a longer time to complete; others were found to be less difficult than expected and caused opposite readjustments of the program plan. These effects tend to balance each other when the program is considered as a whole.

Travelli, A.

1980-01-01T23:59:59.000Z

435

N reactor safety upgrades final status report  

Science Conference Proceedings (OSTI)

This document describes the requirements, objectives, work completed, and issues resolved for all safety upgrades recommended by the various expert panels (e.g., Roddis), National Academy of Sciences (NAS), and Westinghouse Independent Safety Appraisal (WISA) team. This report reflects the status of the recommendations at the time of publication, while the reactor is being placed in cold standby. Each recommendation required a resolution, a closure process if closed, and a punchlist reference if open and required for restart. These recommendations are maintained on databases that were updated periodically as work was completed or punchlisted. The databases and files are to be retained with the N Reactor Standby files.

Foreman, S.K.; Rainey, T.E.; Erpenbeck, E.G.

1990-02-01T23:59:59.000Z

436

Status of 2XIIB plasma confinement experiments  

SciTech Connect

This report describes the status of 2XIIB neutral beam injection experiments with stabilizing plasma. The stream suppresses ion-cyclotron fluctuations and permits density to 5 x 10$sup 13$ cm$sup -3$. The ion energy is 13 keV, and electron temperature reaches 140 eV. Plasma confinement increases with ion energy and n tau reaches 7 x 10$sup 10$ cm$sup -3$.s at 13 keV. The n tau energy scaling is consistent with electron drag and ion-ion scattering losses. Buildup on a streaming plasma in a steady-state magnetic field is described. (auth)

Coensgen, F. J.; Clauser, J. F.; Correll, D. L.

1976-02-11T23:59:59.000Z

437

Present status of mirror stability theory  

SciTech Connect

A status report of microinstability as it applies to 2XIIB and MX theory for mirror machines is presented. It is shown that quasilinear computations reproduce many of the parameters observed in the 2XIIB experiment. In regard to large mirror machines, there are presented detailed calculations of the linear theory of the drift cyclotron loss-cone mode, with inhomogeneous geometry and nonlinear diffusive effects. Further, the stability of a mirror machine to the Alfven ion-cyclotron instability is assessed, and the Baldwin- Callen diffusion is estimated for a spatially varying plasma. (auth)

Baldwin, D. E.; Berk, H. L.; Byers, J. A.

1976-02-11T23:59:59.000Z

438

Distillation: Present Status and Future Directions  

E-Print Network (OSTI)

Distillation will undoubtedly continue to be the most-used method for separating liquid mixtures, at any scale of operation. For this reason, and also because of its recognized energy intensiveness, distillation commands continued scrutiny with respect to cost-effective improvements. In this paper, the authors suggest fruitful areas of research that can lead to lower cost distillation separations. The areas of research are classified under the headings of phase equilibrium, material and energy balances, mass transfer efficiencies, equipment design, and system energy consumption. For each of the categories, a summary is given of the present status of the technology as well as directions that improvement-type investigations might take.

Fair, J. R.; Humphrey, J. L.

1984-01-01T23:59:59.000Z

439

BIIDSS GL Inquiry Reports CRSP CASH STATUS  

NLE Websites -- All DOE Office Websites (Extended Search)

BIIDSS GL Inquiry Reports BIIDSS GL Inquiry Reports CRSP CASH STATUS SEPTEMBER 2013 ($ IN THOUSANDS) GENERAL SALT SEED- ROCKY DESERT LEDGER DESCRIPTION FUND LAKE SKADEE DOLORES MOUNTAIN SW TOTALS CASH 101002 PY UNDISBURSED RAF 118 $ - $ - $ - $ - $ 118 $ VAF - $ - $ - $ - $ - $ - $ VMF 41,453 $ 35 $ 579 $ (3,076) $ (1,181) $ 37,810 $ VRF (63,318) $ 2,139 $ 8,487 $ 61,337 $ 128,883 $ 137,528 $ 101003 CY COLLECTIONS VMF 118,825 $ - $ - $ 43,600 $ 46,030 $ 208,455 $ VRF (8,415) $ 884 $ 2,313 $ 987 $ (43,335) $ (47,566) $ 101004 CY DISBURSEMENTS RAF (27) $ -

440

Status of the Milagro $\\gamma$ Ray Observatory  

E-Print Network (OSTI)

The Milagro Gamma Ray Observatory is the world's first large-area water Cherenkov detector capable of continuously monitoring the sky at TeV energies. Located in northern New Mexico, Milagro will perform an all sky survey of the Northern Hemisphere at energies between ~250 GeV and 50 TeV. With a high duty cycle, large detector area (~5000 square meters), and a wide field-of-view (~1 sr), Milagro is uniquely capable of searching for transient and DC sources of high-energy gamma-ray emission. Milagro has been operating since February, 1999. The current status of the Milagro Observatory and initial results will be discussed.

Atkins, R; Berley, D; Chen, M L; Coyne, D G; Delay, R S; Dingus, B L; Dorfan, D E; Ellsworth, R W; Evans, D; Falcone, A D; Fleysher, L; Fleysher, R; Gisler, G; Goodman, J A; Haines, T J; Hoffman, C M; Hugenberger, S; Kelley, L A; Leonor, I; Macri, J R; McConnell, M; McCullough, J F; McEnery, J E; Miller, R S; Mincer, A I; Morales, M F; Nmethy, P; Ryan, J M; Schneider, M; Shen, B; Shoup, A L; Sinnis, G; Smith, A J; Sullivan, G W; Thompson, T N; Tmer, T O; Wang, K; Wascko, M O; Westerhoff, S; Williams, D A; Yang, T; Yodh, G B

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

WEB PUBLISHING APPLICATION FORM: REGISTRATION AS OPENTEXT CMS APPROVER This form should be printed and completed by members of staff of the University who wish to  

E-Print Network (OSTI)

WEB PUBLISHING APPLICATION FORM: REGISTRATION AS OPENTEXT CMS APPROVER This form should be printed and updating web information using OpenText CMS [Content Management System]. An Approver has the ability.e. the navigation or information architecture. If you only need to edit an existing web site and create or edit

Howie, Jim

442

Alternative Fuels Data Center: Status Update: Ethanol Blender Pump  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Ethanol Blender Pump Dispenser Certified (August 2010) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Google Bookmark Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Delicious Rank Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Digg Find More places to share Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on

443

NETL: News Release - Energy Department Approves Full-Scale Demonstration of  

NLE Websites -- All DOE Office Websites (Extended Search)

7 , 2006 7 , 2006 Energy Department Approves Full-Scale Demonstration of Coal Dryer Innovative Technology Promises More Power, Lower Costs, Reduced Emissions WASHINGTON, DC - Building on the continuous operation of a prototype coal dryer that uses waste heat to remove moisture from coal, the U.S. Department of Energy (DOE) has given the go-ahead to Great River Energy to conduct the first-ever full-scale demonstration of the utility company's innovative technology. Great River Energy will soon begin the demonstration at its Coal Creek Station near Underwood, N.D., during the second phase of a cost-shared project with DOE. The $31.5 million project, which received $13.5 million in funding from DOE, was one of eight projects selected in the first phase of DOE's Clean Coal Power Initiative, a 10-year $2-billion commitment to advance of clean coal technologies and an integral part of the Administration's National Energy Policy. The projects are managed by DOE's National Energy Technology Laboratory.

444

Approved for public release; distribution is unlimited. Prepared for U.S. Army Corps of Engineers  

E-Print Network (OSTI)

Washington, DC 20314-1000ABSTRACT: The primary issues affecting energy options are those of availability, affordability, sustainability, and security. Since energy resources are unevenly distributed around the world, and the impacts of energy consumption have global reach in both environmental and political terms, any meaningful review of energy-related issues must take a global perspective. This work synopsizes world and national energy issues (including energy source options, resource stocks, and future prognosis) in the context of how Army installations need to respond to changing trends. This report presents implications of actions that may be taken in response to the national and world energy situation, to help the Army to make informed choices on energy utilization that will contribute to sustaining the Armys mission. DISCLAIMER: The contents of this report are not to be used for advertising, publication, or promotional purposes. Citation of trade names does not constitute an official endorsement or approval of the use of such commercial products. All product names and trademarks cited are the property of their respective owners. The findings of this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.

Donald F. Fournier; Eileen T. Westervelt September; Eileen T. Westervelt; Donald F. Fournier

2005-01-01T23:59:59.000Z

445

The Status of the Taiwan Photon Source  

SciTech Connect

NSRRC has been operating a 1.5 GeV synchrotron light source, the Taiwan Light Source (TLS), for over 15 years and has established a large user community. For the future development of synchrotron radiation research in Taiwan, a feasibility study report to construct a 3.0 GeV low-emittance storage ring, the Taiwan Photon Source (TPS), was issued in July 2005. The government approval of the TPS project was obtained in December 2007 and the machine will be built at current site of NSRRC. The project has progressed steadily since and reached several major milestones now: the architect firm has finished the site plan and civil design, the accelerator design has been fixed, and purchase of long-lead items begins its course. The TPS storage ring has a circumference of 518.4 meters with a concentric booster of 496.8 meters. The storage ring adopted a 24-cell double-bend structure with a 1.6 nm-rad natural emittance. There are six 12-m and eighteen 7-m ID straights. For user research, five new beamlines have been selected for the Phase I operations: the micro protein crystallography, the materials sub-micron diffraction, the inelastic soft x-ray scattering, the coherent x-ray scattering, and the nano probe beamlines. The civil construction is getting ready to start. The commissioning of the TPS storage ring is targeted for 2013.

Kuo, C. C.; Wang, J. P.; Chen, J. R.; Hsu, K. T.; Wang, C.; Yang, Y. W.; Luo, G. H.; Chen, C. T.; Liang, K. S. [National Synchrotron Radiation Research Center, Hsinchu 30076, Taiwan (China)

2010-06-23T23:59:59.000Z

446

Wood combustion systems: status of environmental concerns  

DOE Green Energy (OSTI)

This document addresses the uncertainties about environmental aspects of Wood Combustion Systems that remain to be resolved through research and development. The resolution of these uncertainties may require adjustments in the technology program before it can be commercialized. The impacts and concerns presented in the document are treated generically without reference to specific predetermined sites unless these are known. Hence, site-specific implications are not generally included in the assessment. The report consists of two main sections which describe the energy resource base involved, characteristics of the technology, and introduce the environmental concerns of implementing the technology; and which review the concerns related to wood combustion systems which are of significance for the environment. It also examines the likelihood and consequence of findings which might impede wood commercialization such as problems and uncertainties stemming from current or anticipated environmental regulation, or costs of potential environmental controls. This document is not a formal NEPA document. Appropriate NEPA documentation will be prepared after a formal wood combustion commercialization program is approved by DOE.

Dunwoody, J.E.; Takach, H.; Kelley, C.S.; Opalanko, R.; High, C.; Fege, A.

1980-01-01T23:59:59.000Z

447

Geothermal: Sponsored by OSTI -- Wulanchabu UCG site data-status...  

Office of Scientific and Technical Information (OSTI)

Wulanchabu UCG site data-status report Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search About Publications Advanced...

448

Geothermal: Sponsored by OSTI -- STATUS OF PLOWSHARE GEOTHERMAL...  

Office of Scientific and Technical Information (OSTI)

STATUS OF PLOWSHARE GEOTHERMAL POWER. Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search About Publications Advanced Search...

449

Strategic Analysis of the Global Status of Carbon Capture and...  

Open Energy Info (EERE)

Summary LAUNCH TOOL Name: Strategic Analysis of the Global Status of Carbon Capture and Storage (CCS): Country Studies, United Arab Emirates Focus Area: Clean Fossil Energy...

450

Strategic Analysis of the Global Status of Carbon Capture and...  

Open Energy Info (EERE)

Summary LAUNCH TOOL Name: Strategic Analysis of the Global Status of Carbon Capture and Storage: Country Studies, Brazil Focus Area: Clean Fossil Energy Topics: Policy Impacts...

451

Microsoft PowerPoint - SWL NERC status june 2009.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

CORPS OF ENGINEERS SOUTHWEST REGION NERC ACTIVITIES SOUTHWESTERN FEDERAL HYDROPOWER CONFERENCE 2 COE Status of NERC Background * 2005 - Energy Policy Act Passed * March 2007 -...

452

2010 Inspection and Status Report for the Boiling Nuclear Superheater...  

Office of Legacy Management (LM)

3 Annual Inspection - Boiling Nuclear Superheat (BONUS) Site, Rincn, Puerto Rico October 2013 Page 1 2013 Inspection and Status Report for the Former Boiling Nuclear Superheater...

453

Status of the Daya Bay Reactor Neutrino Oscillation Experiment  

E-Print Network (OSTI)

Status of the Daya Bay Reactor Neutrino OscillationCheng-Ju Lin The Daya Bay reactor neutrino experiment [1] isneutrinos from the nuclear reactors at different baselines.

Lin, Cheng-Ju Stephen

2011-01-01T23:59:59.000Z

454

Current Status and Outlook of Computational Materials ... - TMS  

Science Conference Proceedings (OSTI)

Feb 8, 2007 ... Topic Title: Article: Current Status and Outlook of Computational Materials Science Education in the US Topic Summary: K. Thornton and M.

455

Article: Current Status and Outlook of Computational Materials - TMS  

Science Conference Proceedings (OSTI)

Jul 1, 2008 ... Citation: Thornton, K. and Asta, M., Current status and outlook of computational materials science education in the US, Modelling Simul. Mater...

456

Status and Prospects of the Global Automotive Fuel Cell Industry...  

NLE Websites -- All DOE Office Websites (Extended Search)

ORNLTM-2013222 Energy and Transportation Science Division Center for Transportation Analysis STATUS AND PROSPECTS OF THE GLOBAL AUTOMOTIVE FUEL CELL INDUSTRY AND PLANS FOR...

457

Neutron Science Facilities Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Neutron Science Facilities Operating Status High Flux Isotope Reactor The reactor is currently operating at 100% power for fuel cycle 449. Spallation Neutron Source SNS is shutdown...

458

HSS Focus Group Meeting (Activities Status) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Download Meeting Agenda Meeting Summary and Participants Draft Work Group Matrix Key Milestone Status Chart (June 15, 2011) HSS Project - Cumulative Progress Chart...

459

Radiation protection for medical and allied health personnel-approved 1976  

SciTech Connect

With the ever-increasing use of x rays and radioactive materials, more and more persons may be exposed to ionizing radiations in the course of their work. The professional status of these individuals ranges from the highly-trained radiation specialist to the casual interdepartmental messenger. Many of these people have very little information about the possible biological effects of radiation or about the amounts which may be significant. Their attitudes toward possible exposure vary from indifference to almost pathological fear. Frequently they have questions about radiation and radiation protection practices but are reluctant or unable to seek out those who could provide answers. Their concern and interest, however, should not be ignored. This report seeks to meet their needs.

1977-01-01T23:59:59.000Z

460

Status Report, Environmental Protection Program - December 2005 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Protection Program - December 2005 Environmental Protection Program - December 2005 Status Report, Environmental Protection Program - December 2005 December 2005 Report on Implementation of DOE Order 450.1, Environmental Protection Program This report summarizes the observations and insights from evaluating the effectiveness of implementing select requirements of U.S. Department of Energy (DOE) Order 450.1 during Office of Independent Oversight environment, safety, and health (ES&H) management inspections conducted in 2005. Generally, the five sites' P2 programs have been implemented, although availability of resources varies. P2 requirements have been communicated actively and effectively through various mechanisms. Dedicated personnel support site-wide program activities and assist line organizations in

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

UESC Status Data Collection and Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

| www1.eere.energy.gov/femp/ | www1.eere.energy.gov/femp/ UESC Status Data Collection and Analysis Jesse Feinberg Energetics, Incorporated April 14, 2010 Federal Energy Management Program | www1.eere.energy.gov/femp/ 2 * Why FEMP collects UESC data * Data trends - where are we now? * Incentives to sharing data Purpose Federal Energy Management Program | www1.eere.energy.gov/femp/ A one page history... UESCs authorized in Energy Policy Act of 1992 Agencies are authorized and encouraged to participate in programs to increase energy efficiency and for water conservation or the management of electricity demand conducted by gas, water, or electric utilities... No mandate to report UESC activity. FEMP tracks projects on voluntary basis. Steady reported growth of UESC financing vehicle for almost 20 years.

462

SF-4400-ATS Affidavit of Tax Status  

NLE Websites -- All DOE Office Websites (Extended Search)

ATS (07-2012) ATS (07-2012) SANDIA PROPRIETARY INFORMATION PERSONALLY IDENTIFIABLE INFORMATION (PII) (WHEN COMPLETE) Affidavit of Tax Status Benefits paid under a group health plan for your covered dependents who do not qualify for tax-free health coverage under the Internal Revenue Code causes you to receive additional compensation as taxable wages. Generally, same-gender domestic partners and their children do not qualify for tax-free health coverage and are, therefore, considered Non- Qualifying Dependents. You are required to declare as taxable income the value (imputed income) of the coverage for your Non-Qualifying Dependent(s). Imputed income is not a pay increase. It is the value of Sandia's contributions for medical (including the Health Reimbursement Account, if applicable), dental, and/or vision coverage for dependents who do not

463

Hybrid Arc Cell Studies: Status Report  

SciTech Connect

I report on the status, at the end of FY12, of the studies of an arc cell for a hybrid synchrotron accelerating from 375 GeV/c to 750 GeV/c in momentum. Garren produced a complete lattice that gives a good outline of the structure of a hybrid synchrotron lattice. It is, however, lacking in some details: it does not maintain a constant time of flight, it lacks chromaticity correction, its cell structure is not ideal for removing aberrations from chromaticity correction, and it probably needs more space between magnets. I have begun studying cell structures for the arc cells to optimize the lattice performance and cost. I present some preliminary results for two magnets per half cell. I then discuss difficulties encountered, some preliminary attempts at resolving them, and the future plans for this work.

Berg J. S.

2012-09-28T23:59:59.000Z

464

Naturalness and the Status of Supersymmetry  

E-Print Network (OSTI)

For decades, the unnaturalness of the weak scale has been the dominant problem motivating new particle physics, and weak-scale supersymmetry has been the dominant proposed solution. This paradigm is now being challenged by a wealth of experimental data. In this review, we begin by recalling the theoretical motivations for weak-scale supersymmetry, including the gauge hierarchy problem, grand unification, and WIMP dark matter, and their implications for superpartner masses. These are set against the leading constraints on supersymmetry from collider searches, the Higgs boson mass, and low-energy constraints on flavor and CP violation. We then critically examine attempts to quantify naturalness in supersymmetry, stressing the many subjective choices that impact the results both quantitatively and qualitatively. Finally, we survey various proposals for natural supersymmetric models, including effective supersymmetry, focus point supersymmetry, compressed supersymmetry, and R-parity-violating supersymmetry, and summarize their key features, current status, and implications for future experiments.

Jonathan L. Feng

2013-02-26T23:59:59.000Z

465

Status of the BNL IFEL accelerator  

Science Conference Proceedings (OSTI)

A 40 MeV electron beam, using the inverse free-electron laser interaction, has been accelerated by {Delta}E/E = 2.5% over a distance of 0.47 m. The electrons interact with a 1--2 GW CO{sub 2} laser beam bounded by a 2.8 mm ID sapphire circular waveguide in the presence of a tapered wiggler with Bmax {approx} 1 T and a period 2.89 cm {le} {lambda}{sub w} {le} 3.14 cm. The experimental results of {Delta}E/E as a function of electron energy E, peak magnetic field Bw and laser power W{sub 1} compare well with analytical and 1-D numerical simulations and permit scaling to higher laser power and electron energy. The present status of the IFEL accelerator and planned near term development are indicated.

Steenbergen, A. van; Gallardo, J. [Brookhaven National Lab., Upton, NY (United States); Sandweiss, J. [Yale Univ., New Haven, CT (United States). Physics Dept.] [and others

1996-10-01T23:59:59.000Z

466

Solid Oxide Fuel Cells: Technology Status  

Science Conference Proceedings (OSTI)

In its most common configuration, solid oxide fuel cell (SOFC) uses an oxygen ion conducting ceramic electrolyte membrane, perovskite cathode and nickel cermet anode electrode. Cells operate in the 600-1000 C temperature range and utilize metallic or ceramic current collectors for cell-to-cell interconnection. Recent development in engineered electrode architectures, component materials chemistry, cell and stack designs and fabrication processes have led to significant improvement in the electrical performance and performance stability as well as reduction in the operating temperature of such cells. Large kW-size power generation systems have been designed and field demonstrated. This paper reviews the status of SOFC power generation systems with emphasis on cell and stack component materials, electrode reactions, materials reactions and corrosion processes

Singh, Prabhakar; Minh, Nguyen Q.

2004-08-01T23:59:59.000Z

467

ILC Marx Modulator Development Program Status  

DOE Green Energy (OSTI)

Development of a first generation prototype (P1) Marx-topology klystron modulator for the International Linear Collider is nearing completion at the Stanford Linear Accelerator Center. It is envisioned as a smaller, lower cost, and higher reliability alternative to the present, bouncer-topology, 'Baseline Conceptual Design'. The Marx presents several advantages over conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at ILC parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. The P1-Marx employs all solid state elements; IGBTs and diodes, to control the charge, discharge and isolation of the cells. A general overview of the modulator design and the program status are presented.

Burkhart, C.; Beukers, T.; Larsen, R.; Macken, K.; Nguyen, M.; Olsen, J.; Tang, T.; /SLAC

2009-03-04T23:59:59.000Z

468

Status of the Magma Energy Project  

DOE Green Energy (OSTI)

The current magma energy project is assessing the engineering feasibility of extracting thermal energy directly from crustal magma bodies. The estimated size of the US resource (50,000 to 500,000 quads) suggests a considerable potential impact on future power generation. In a previous seven-year study, we concluded that there are no insurmountable barriers that would invalidate the magma energy concept. Several concepts for drilling, energy extraction, and materials survivability were successfully demonstrated in Kilauea Iki lava lake, Hawaii. The present program is addressing the engineering design problems associated with accessing magma bodies and extracting thermal energy for power generation. The normal stages for development of a geothermal resource are being investigated: exploration, drilling and completions, production, and surface power plant design. Current status of the engineering program and future plans are described. 20 refs., 12 figs.

Dunn, J.C.

1987-01-01T23:59:59.000Z

469

STATUS OF SRF FACILITIES AT SNS  

Science Conference Proceedings (OSTI)

The Spallation Neutron Source (SNS) has recognized the need for developing in-house capability to ensure long term sustainability of the superconducting linac (SCL). SNS has made substantial gains in the last 6 years in understanding SCL operation, including system and equipment limiting factors, and resolution of system and equipment issues. Significant effort and focus is required to assure on-going success in the operation, maintenance, and improvement of the SCL and to address the requirements of the upgrade project for the Second Target Station. These interdependent efforts include implementation of demonstrated improvements, fabrication of spare cryomodules, cavity R&D to enhance machine performance, and related SRF facility developments. Cryomodule and vertical cavity testing facilities are being developed to demonstrate process capabilities and to further understand the collective limitations of installed cavities. The status and future plans for SRF facilities at SNS will be presented.

Kim, Sang-Ho [ORNL; Xu, Ting [ORNL; Afanador, Ralph [ORNL; Howell, Matthew P [ORNL; Crofford, Mark T [ORNL; Stewart, Stephen [ORNL

2012-01-01T23:59:59.000Z

470

US nuclear engineering education: Status and prospects  

SciTech Connect

This study, conducted under the auspices of the Energy Engineering Board of the National Research Council, examines the status of and outlook for nuclear engineering education in the United States. The study resulted from a widely felt concern about the downward trends in student enrollments in nuclear engineering, in both graduate and undergraduate programs. Concerns have also been expressed about the declining number of US university nuclear engineering departments and programs, the aging of their faculties, the appropriateness of their curricula and research funding for industry and government needs, the availability of scholarships and research funding, and the increasing ratio of foreign to US graduate students. A fundamental issue is whether the supply of nuclear engineering graduates will be adequate for the future. Although such issues are more general, pertaining to all areas of US science and engineering education, they are especially acute for nuclear engineering education. 30 refs., 12 figs., 20 tabs.

1990-01-01T23:59:59.000Z

471

The status of the ANTARES experiment  

E-Print Network (OSTI)

ANTARES is a neutrino telescope designed to search for high-energy neutrinos from astrophysical sources such as quasars, gamma-ray bursters, microquasars, supernova remnants and AGN. The objectives also include the indirect search for WIMPs, primary candidates for non-baryonic dark matter, by looking for neutrinos from neutralino annihilations in the centres of the Sun, Earth and Galaxy. The array of 12 lines with 900 photomultiplier tubes will be deployed by 2007 at a depth of about 2500 m in the Mediterranean sea near Toulon (France), 40 km off the coast. It will detect the Cherenkov light emitted in sea water by muons produced via charged-current interactions of neutrinos with surrounding matter. A prototype line and an instrumentation line for monitoring environmental parameters have been successfully deployed and connected to the electro-optical cable, which transmitted the data to the shore station. The current status of the project is presented.

E. V. Korolkova; for the ANTARES collaboration

2004-08-12T23:59:59.000Z

472

Gaseous-fuel safety assessment. Status report  

DOE Green Energy (OSTI)

The Los Alamos National Laboratory, in support of studies sponsored by the Office of Vehicle and Engine Research and Development in the US Department of Energy, has undertaken a safety assessment of selected gaseous fuels for use in light automotive transportation. The purpose is to put into perspective the hazards of these fuels relative to present day fuels and delineated criteria for their safe handling. Fuels include compressed and liquified natural gas (CNG and LNG), liquefied petroleum gas (LPG), and for reference gasoline and diesel. This paper is a program status report. To date, physicochemical property data and general petroleum and transportation information were compiled; basic hazards defined; alternative fuels were safety-ranked based on technical properties alone; safety data and vehicle accident statistics reviewed; and accident scenarios selected for further analysis. Methodology for such analysis is presently under consideration.

Krupka, M.C.; Edeskuty, F.J.; Bartlit, J.R.; Williamson, K.D. Jr.

1982-01-01T23:59:59.000Z

473

DOE-STD-1082-94; DOE Standard Preparation, Review, and Approval of Implementaiton Plans For Nuclear Safety Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82-94 82-94 October 1994 DOE STANDARD PREPARATION, REVIEW, AND APPROVAL OF IMPLEMENTATION PLANS FOR NUCLEAR SAFETY REQUIREMENTS U.S. Department of Energy AREA SAFT Washington D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615)576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. Order No. DE95001461 DOE-STD-1082-94 iii FOREWORD 1. This Department of Energy (DOE) technical standard has been prepared by the Office of Environment, Safety and Health with the assistance of Steve

474

NSTX Liquid Lithium Divertor (LLD) Design Status and Plans  

E-Print Network (OSTI)

NSTX Liquid Lithium Divertor (LLD) Design Status and Plans Office of Science H. W. Kugel, PPPL Design Status and Plans (Kugel) 2July 28, 2008 Motivation for NSTX Lithium Research · NSTX research with solid lithium is aimed initially towards using liquid lithium to control density, edge collisionality

Princeton Plasma Physics Laboratory

475

Office of Information Technology University of Minnesota 1 System Status  

E-Print Network (OSTI)

Management website. Scheduled Maintenance Due to its critical nature, no down time is scheduled for System. There are no regularly scheduled maintenance periods for the System Status web page. It is the goal of support team to provide the System Status web page information without interruption. Application maintenance is performed

Amin, S. Massoud

476

Status Differences in the Cognitive Activation of Social Networks  

Science Conference Proceedings (OSTI)

We develop a dynamic cognitive model of network activation and show that people at different status levels spontaneously activate, or call to mind, different subsections of their networks when faced with job threat. Using a multimethod approach (General ... Keywords: experimental designs, labor markets, laboratory research, organization and management theory, organizational behavior, psychological processes, social networks, status

Edward Bishop Smith; Tanya Menon; Leigh Thompson

2012-01-01T23:59:59.000Z

478

Property:BLM CaseStatus | Open Energy Information  

Open Energy Info (EERE)

BLM CaseStatus BLM CaseStatus Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Property Name BLM CaseStatus Property Type String Description Status of case at most recent import from LR2000. Most of these cases are actually leases. Allows Values Authorized, Cancelled, Closed, Expired, Pending, Rejected, Relinquished, Withdrawn This is a property of type String. The allowed values for this property are: Authorized Cancelled Closed Expired Pending Rejected Relinquished Withdrawn Subproperties This property has the following 5 subproperties: C CACA-005224 N NVN-075549 NVN-076209 NVN-076822 NVN-076825 Pages using the property "BLM CaseStatus" Showing 25 pages using this property. (previous 25) (next 25) A AZA-009168 + Closed + AZA-009169 + Closed + AZA-009170 + Closed +

479

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation or date. Last Revised: 12/19/2013 StatusChart_December2013revised.pdf More Documents & Publications 2013 Annual Planning Summary for the Western Area Power Administration 2012 Annual Planning Summary for Western Area Power Administration 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION

480

Property:BLM LeaseStatus | Open Energy Information  

Open Energy Info (EERE)

LeaseStatus LeaseStatus Jump to: navigation, search Property Name BLM LeaseStatus Property Type String Description Status of lease at most recent import from LR2000 Allows Values Authorized, Cancelled, Closed, Expired, Pending, Rejected, Relinquished, Withdrawn This is a property of type String. The allowed values for this property are: Authorized Cancelled Closed Expired Pending Rejected Relinquished Withdrawn Retrieved from "http://en.openei.org/w/index.php?title=Property:BLM_LeaseStatus&oldid=600765" Categories: Properties BLM Lease Properties What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863120002 Varnish cache server

Note: This page contains sample records for the topic "approval status scr" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Directory of Certificates of Compliance for radioactive materials packages: Report of NRC approved quality assurance programs for radioactive materials packages. Volume 3, Revision 15  

SciTech Connect

The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volumes 1 and 2. An alphabetical listing by user name is included in the back of Volume 3 of approved QA programs. The reports include a listing of all users of each package design and approved QA programs prior to the publication date.

NONE

1995-10-01T23:59:59.000Z

482

Geothermal energy in California: Status report  

DOE Green Energy (OSTI)

The potential for electric energy from geothermal resources in California is currently estimated to be equivalent to the output from 14 to 21 large (1000 MW) central station power plants. In addition, since over 30 California cities are located near potential geothermal resources, the non-electric applications of geothermal heat (industrial, agriculture, space heating, etc.) could be enormous. Therefore, the full-scale utilization of geothermal resources would have a major impact upon the energy picture of the state. This report presents a summary of the existing status of geothermal energy development in the state of California as of the early part of 1976. The report provides data on the extent of the resource base of the state and the present outlook for its utilization. It identifies the existing local, state, and federal laws, rules and regulations governing geothermal energy development and the responsibilities of each of the regulatory agencies involved. It also presents the differences in the development requirements among several counties and between California and its neighboring states. Finally, it describes on-going and planned activities in resource assessment and exploration, utilization, and research and development. Separate abstracts are prepared for ERDA Energy Research Abstracts (ERA) for Sections II--VI and the three Appendixes.

Citron, O.; Davis, C.; Fredrickson, C.; Granit, R.; Kerrisk, D.; Leibowitz, L.; Schulkin, B.; Wornack, J.

1976-06-30T23:59:59.000Z

483

Development Status of The ILC Marx Modulator  

SciTech Connect

The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-}0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

Nguyen, M; Beukers, T.; Burkhart, C.; Larsen, R.; Olsen, J.; Tang, T.; /SLAC

2010-06-07T23:59:59.000Z

484

Status of wake and array loss research  

DOE Green Energy (OSTI)

In recent years, many projects have evaluated wind turbine wake effects and resultant array losses in both Europe and the United States. This paper examines the status of current knowledge about wake effects and array losses and suggests future research. Single-turbine wake characteristics have been studied extensively and are generally described well by existing theoretical models. Field measurements of wake effects in wind turbine arrays are largely limited to small arrays, with 2 to 4 rows of turbines. Few data have been published on wake effects within large arrays. Measurements of wake deficits downwind of large arrays that deficits are substantially larger and extend farther downwind than expected. Although array design models have been developed, these models have been tested and verified using only limited data from a few rows of wind turbines in complex terrain, whereas some of the largest arrays have more than 40 rows of wind turbines. Planned cooperative efforts with the wind industry will obtain existing data relevant to analyzing energy deficits within large arrays and identifying data sets for potential use in array model verification efforts. Future research being considered include a cooperative research experiment to obtain more definitive data on wake deficits and turbulence within and downwind of large arrays. 16 refs., 9 figs., 1 tab.

Elliott, D.L.

1991-09-01T23:59:59.000Z

485

Status of the LBNE Neutrino Beamline  

SciTech Connect

The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota. The neutrinos are produced in a three-step process. First, protons from the Main Injector (60-120 GeV) hit a solid target and produce mesons. Then, the charged mesons are focused by a set of focusing horns into the decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the Monte Carlo modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be {approx}700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW. We discuss here the status of the conceptual design and the associated challenges.

Papadimitriou, Vaia; /Fermilab

2011-12-01T23:59:59.000Z

486

The Power Systems Development Facility -- Current status  

Science Conference Proceedings (OSTI)

Southern Company Services, Inc. (SCS) has entered into a cooperative agreement with the US Department of Energy (DOE) to build and operate the Power Systems Development Facility (PSDF), currently under construction in Wilsonville, Alabama, 40 miles southeast of Birmingham. The objectives of the PSDF are to develop advanced coal-fired power generation technologies through testing and evaluation of hot gas cleanup systems and other major components at the pilot scale. The performance of components will be assessed and demonstrated in an integrated mode of operation and at a component size readily scaleable to commercial systems. The facility will initially contain five modules: (1) a transport reactor gasifier and combustor, (2) an advanced pressurized fluidized-bed combustion (APFBC) system, (3) a particulate control module, (4) an advanced burner-gas turbine module, and (5) a fuel cell. The five modules will initially be configured into two separate test trains, the transport reactor train (2 tons/hour of coal feed) and the APFBC train (3 tons/hour of coal feed). In addition to a project description, the project design and construction status, preparations for operations, and project test plans are reported in this paper.

Pinkston, T.E.; Maxwell, J.D.; Leonard, R.F.; Vimalchand, P.

1995-11-01T23:59:59.000Z

487

IETF Internet-Draft Intended status: Informational  

E-Print Network (OSTI)

Towards an Information-Centric Internet with more Things draft-kutscher-icn-iwmt-00 The Internet is already made of things. However, we expect there to be many more less-capable things, such as sensors and actuators, connected to the Internet in years to come. In parallel, Internet applications are more and more being used to perform operations on named (information) objects, and various Information-Centric Networking (ICN) approaches are being researched in order to allow such applications to work effectively at scale and with various forms of mobility and in networking environments that are more challenging than a traditional access network and data center. In this position paper, we outline some benefits that may accrue, and issues that arise, should the Internet, with many more things, make use of the ICN approach to networking and we argue that ICN concepts should be considered when planning for increases in the number of things connected to the Internet. Status of this Memo This Internet-Draft is submitted in full conformance with the

D. Kutscher; S. Farrell

2011-01-01T23:59:59.000Z

488

CMS: Present status, limitations, and upgrade plans  

SciTech Connect

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab

2011-09-01T23:59:59.000Z

489

AGC-1 Post Irradiation Examination Status  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) Graphite R&D program is currently measuring irradiated material property changes in several grades of nuclear graphite for predicting their behavior and operating performance within the core of new Very High Temperature Reactor (VHTR) designs. The Advanced Graphite Creep (AGC) experiment consisting of six irradiation capsules will generate this irradiated graphite performance data for NGNP reactor operating conditions. All six AGC capsules in the experiment will be irradiated in the Advanced Test Reactor (ATR), disassembled in the Hot Fuel Examination Facility (HFEF), and examined at the INL Research Center (IRC) or Oak Ridge National Laboratory (ORNL). This is the first in a series of status reports on the progress of the AGC experiment. As the first capsule, AGC1 was irradiated from September 2009 to January 2011 to a maximum dose level of 6-7 dpa. The capsule was removed from ATR and transferred to the HFEF in April 2011 where the capsule was disassembled and test specimens extracted from the capsules. The first irradiated samples from AGC1 were shipped to the IRC in July 2011and initial post irradiation examination (PIE) activities were begun on the first 37 samples received. PIE activities continue for the remainder of the AGC1 specimen as they are received at the IRC.

David Swank

2011-09-01T23:59:59.000Z

490

Status of the START neutral beam project  

DOE Green Energy (OSTI)

A major advantage of spherical tokamaks is their potential for achieving high beta and high plasma density in modest sized plasmas using low magntic field. Given this combination of low field and high density, neutral beam injection can provide effective auxiliary heating for the next generation of spherical tokamaks. A neutral beam injector, shipped recently from Oak Ridge National Laboratory as part of an ongoing collaboration on spherical tokamak research, has now been installed onto the START (Small Tight Aspect Ratio Tokamak) experiment at Culham Laboratory. This should provide the first experimental test of neutral injectino into spherical tokamak plasmas, and allow the effects of neutral beam heating on energy confinement and beta values to be assessed at low aspect ratios. This experiment also extends the data base of confinement scaling for tokamaks in general. Modifications to START have included in-situ machining of a new 31 cm diameter port for NBI, plus the installation of a new graphite neutral beam stop equipped with thermocouples to provide beam profile and shinethrough diagnosis. The major modification to the NBI beamline has been the installation of an optical fiber coupled control and instrumentation system. The injector will be operated without cryopumps in a 'volume pumped' configuration, and should provide 0.5 MW of injected hydrogen neutral power at a beam energy of 40 keV for 20 ms pulses. The status of the installation and commissioning program is reported.

Nightingale, M. P. S. [Association EURATOM-CCFE, Abingdon, UK; Peng, Yueng Kay Martin [ORNL

1995-01-01T23:59:59.000Z

491

Development Status of the ILC Marx Modulator  

DOE Green Energy (OSTI)

The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-} 0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

Nguyen, M.; Beukers, T.; Burkhart, C.; Larsen, R.; Olsen, J.; Tang, T.; /SLAC

2008-06-16T23:59:59.000Z

492

Status of load management storage demonstrations  

DOE Green Energy (OSTI)

DOE is funding a nationwide demonstration of electric load management through the use of utility-controlled, customer-side thermal energy storage for residential space conditioning. The general concept of the projects was developed with the assistance of a broadly based working group drawn from the utility industry. This paper presents the current status of these demonstrations. Ten demonstrations are underway - five heat storage and five cool storage - using between 30 and 50 near-commercial thermal storage devices. The installations and experimental program are designed to: (1) collect reliable load research data for assessing the impact on the utility system; (2) delineate and solve installation problems; (3) establish maintainability; (4) illuminate customer and utility acceptance; and (5) generate cost data. The results obtained are expected to assist utilities in making local load-management decisions, to assist DOE in establishing priorities for R and D efforts in load management, and to provide objective information related to the electric system impact, energy conservation, and cost-effectiveness of this form of load management.

Long, H M; Mohre, D L

1979-01-01T23:59:59.000Z

493

Natural gas vehicles : Status, barriers, and opportunities.  

Science Conference Proceedings (OSTI)

In the United States, recent shale gas discoveries have generated renewed interest in using natural gas as a vehicular fuel, primarily in fleet applications, while outside the United States, natural gas vehicle use has expanded significantly in the past decade. In this report for the U.S. Department of Energy's Clean Cities Program - a public-private partnership that advances the energy, economic, and environmental security of the U.S. by supporting local decisions that reduce petroleum use in the transportation sector - we have examined the state of natural gas vehicle technology, current market status, energy and environmental benefits, implications regarding advancements in European natural gas vehicle technologies, research and development efforts, and current market barriers and opportunities for greater market penetration. The authors contend that commercial intracity trucks are a prime area for advancement of this fuel. Therefore, we examined an aggressive future market penetration of natural gas heavy-duty vehicles that could be seen as a long-term goal. Under this scenario using Energy Information Administration projections and GREET life-cycle modeling of U.S. on-road heavy-duty use, natural gas vehicles would reduce petroleum consumption by approximately 1.2 million barrels of oil per day, while another 400,000 barrels of oil per day reduction could be achieved with significant use of natural gas off-road vehicles. This scenario would reduce daily oil consumption in the United States by about 8%.

Rood Werpy, M.; Santini, D.; Burnham, A.; Mintz, M.; Energy Systems

2010-11-29T23:59:59.000Z

494

Ceramic breeder materials : status and needs.  

DOE Green Energy (OSTI)

The tritium breeding blanket is one of the most important components of a fusion reactor because it directly involves both energy extraction and tritium production, both of which are critical to fusion power. Because of their overall desirable properties, lithium-containing ceramic solids are recognized as attractive tritium breeding materials for fusion reactor blankets. Indeed, their inherent thermal stability and chemical inertness are significant safety advantages. In numerous in-pile experiments, these materials have performed well, showing good thermal stability and good tritium release characteristics. Tritium release is particularly facile when an argon or helium purge gas containing hydrogen, typically at levels of about 0.1%, is used. However, the addition of hydrogen to the purge gas imposes a penalty when it comes to recovery of the tritium produced in the blanket. In particular, a large amount of hydrogen in the purge gas will necessitate a large multiple-stage tritium purification unit, which could translate into higher costs. Optimizing tritium release while minimizing the amount of hydrogen necessary in the purge gas requires a deeper understanding of the tritium release process, especially the interactions of hydrogen with the surface of the lithium ceramic. This paper reviews the status of ceramic breeder research and highlights several issues and data needs.

Johnson, C.E.

1998-02-02T23:59:59.000Z

495

Salt repository project closeout status report  

SciTech Connect

This report provides an overview of the scope and status of the US Department of Energy (DOE`s) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs.

1988-06-01T23:59:59.000Z

496

Status of UFD Campaign International Activities in Disposal Research |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status of UFD Campaign International Activities in Disposal Status of UFD Campaign International Activities in Disposal Research Status of UFD Campaign International Activities in Disposal Research Several international organizations have made significant progress in the characterization and performance evaluation of other disposal design options and host rock characteristics (clay/shale, granite), most of which were very different from those studied in the United States. The DOE recognizes that close international collaboration is a beneficial and cost effective strategy for advancing disposal science. This report describes the active collaboration opportunities available to U.S. researchers, and presents specific cooperative research activities that have been recently initiated within DOE's disposal research program.

497

The Atlantic Forest of South America: Biodiversity Status, Threats, and Outlook  

E-Print Network (OSTI)

Status, Threats, and Outlook By Carlos Galindo-Leal andStatus, Threats, and Outlook. (Center for Appliedstatus, threats, and outlook. The book begins with a

Sayre, Don

2003-01-01T23:59:59.000Z

498

Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1992 quality program status report  

SciTech Connect

This status report summarizes the activities and accomplishments of the Los Alamos Yucca Mountain Site Characterization Project`s quality assurance program for calendar year 1992. The report includes major sections on Program Activities and Trend Analysis. Program Activities are discussed periodically at quality meetings. The most significant issue addressed in 1992 has been the timely revision of quality administrative procedures. The procedure revision process was streamlined from 55 steps to 7. The number of forms in procedures was reduced by 38%, and the text reduced by 29%. This allowed revision in 1992 of almost half of all implementing procedures. The time necessary to complete the revision process (for a procedure) was reduced from 11 months to 3 months. Other accomplishments include the relaxation of unnecessarily strict training requirements, requiring quality assurance reviews only from affected organizations, and in general simplifying work processes. All members of the YMP received training to the new Orientation class Eleven other training classed were held. Investigators submitted 971 records to the Project and only 37 were rejected. The software program has 115 programs approved for quality-affecting work. The Project Office conducted 3 audits and 1 survey of Los Alamos activities. We conducted 14 audits and 4 surveys. Eight corrective action reports were closed, leaving only one open. Internally, 22 deficiencies were recognized. This is a decrease from 65 in 1991. Since each deficiency requires about 2 man weeks to resolve, the savings are significant. Problems with writing acceptable deficiency reports have essentially disappeared. Trend reports for 1992 were examined and are summarized herein. Three adverse trends have been closed; one remaining adverse trend will be closed when the affected procedures are revised. The number of deficiencies issued to Los Alamos compared to other participants is minimal.

Bolivar, S.L.; Burningham, A.; Chavez, P. [and others

1994-03-01T23:59:59.000Z

499

Final Focus Test Facility ATF2 Status  

Science Conference Proceedings (OSTI)

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometre level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European and American scientists. In this paper, the present status and performance of the recently deployed ATF2 systems are briefly described, based on the first experience with beam measurements and tuning during winter, spring and early autumn of 2009. The near and longer term plans are outlined as well. The ATF collaboration has completed the construction of ATF2 and has started its commissioning. Important experience operating the new cavity BPM and BSM instrumentation in real conditions has been gained and first beam measurements have been performed in a magnetic configuration with reduced optical demagnification. Both horizontal and vertical emittances were successfully tuned and measured in the extraction line, with values approaching the design values of 2 nm and 12 pm, respectively. First checks of the first order optics along the beam line and at the IP were also done. Hardware developments for the second ATF2 goal are being pursued in parallel with the present commissioning work for the first goal. The collaboration is also preparing several near and long terms plans for ATF2. In the next few years, information very valuable for any future collider with local chromaticity correction and tuning of very low emittance beams can be expected. In the previous experience at the FFTB, the smallest vertical beam sizes which were achieved were about 70 nanometers. The work described here continues to address this largely unexplored regime in a systematic way.

Bambade, P.; /KEK, Tsukuba /Orsay, LAL; Seryi, A.; /SLAC; Tauchi, T.; /KEK, Tsukuba

2012-04-06T23:59:59.000Z