Powered by Deep Web Technologies
Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Moffat Appointed Senior Advisor for Life Sciences at the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

Gluskin of ASD Elected to AAAS Fellowship Gluskin of ASD Elected to AAAS Fellowship Jacobsen of XSD Elected to American Physical Society Fellowship Chapman of XSD Wins Oxford Cryosystems Poster Prize Office of Science Approves Critical Decision 1 for APS Upgrade Project Argonne Breaks Ground on $34.5M MX Research Facility APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Moffat Appointed Senior Advisor for Life Sciences at the APS NOVEMBER 30, 2011 Bookmark and Share Keith Moffat The Advanced Photon Source (APS) is the Western Hemisphere's most powerful source of x-rays for research. It attracts more than 4,000 users from academia, industry, and government laboratories around the world each year for research in all fields of science. In particular, almost half of

2

APS Upgrade | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS APS View Larger The brightness and energy of x-ray beams are critical properties for research. Higher brightness means more x-rays can be focused onto a smaller, laser-like spot, allowing researchers to gather more data in greater detail in less time. Higher energies allow x-rays to penetrate deeper inside materials to reveal crucial information about a material's structure and function. The combination of high brightness and high energy allows the observation and imaging - in real time - of fast and ultrafast technologically important processes, including fuel sprays, magnetic switching, and biological processes in living organisms. The APS Upgrade project will increase the brightness of the APS high-energy (hard) x-ray beams. This will equip researchers for the groundbreaking

3

APS Upgrade | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop on new science opportunities provided by a multi-bend achromat lattice at the APS APS-U MBA Lattice Workshop Registration is now closed. Please contact Diane Wilkinson ext. 7810 or a member of the Workshop Organizing Committee for changes or modifications to your registration. Submit Comments, Suggestions, and Ideas for MBA Lattice Workshop October 21-22 Advanced Photon Source Argonne National Lab The Advanced Photon Source Upgrade is focused on delivering a powerful, versatile facility for science using high-brightness, high-energy X-rays. At APS, and around the light source community, scientists have been developing storage ring designs that push closer to the ultimate diffraction limit for X-ray sources. A recent report by the Basic Energy Sciences Advisory Committee, which advises the Director of the U.S.

4

Office of Science Approves Critical Decision 1 for APS Upgrade...  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Office of Science Approves Critical Decision 1 for APS Upgrade Project SEPTEMBER 15, 2011...

5

APS User News, Issue 76  

NLE Websites -- All DOE Office Websites (Extended Search)

6, February 21, 2012 6, February 21, 2012 CONTENTS DIRECTOR'S CORNER Special Announcement: George Srajer Appointed Project Director for the APS Upgrade and Deputy ALD USER MATTERS -- Registration Open for 2012 APS/CNM/EMC Users Meeting: Our User Science Shapes the Future! -- CALLING ALL VIDEO MAKERS! Submit Your Films for the "Usies Awards"! -- LCLS-II New Instruments Workshops March 19-22, 2012 -- NUFO Goes To Washington! -- Tax Presentation Available BRIEFLY NOTED -- Recognitions and Honors -- Users Meeting Satellite Workshop: "SAXS Software Packages Irena and Nika" -- New Web Page Offers Quick Help Links for Users -- New Mural Graces the Wall near Viewing Area -- General User Proposal Deadline for 2012-2 Run: March 9, 2012 =====================================================

6

APS User News, Special Issue 72  

NLE Websites -- All DOE Office Websites (Extended Search)

SPECIAL ISSUE 72, September 8, 2011 SPECIAL ISSUE 72, September 8, 2011 Message from Eric Isaacs: Stephenson Named APS Director To the APS User Community, I'm extremely pleased to announce that Brian Stephenson has been appointed Associate Laboratory Director (ALD) for Photon Sciences, effective September 1, 2011. The directorate comprises three research and support divisions centered on Argonne's Advanced Photon Source (APS). As you know, Brian has been interim ALD for Photon Sciences since October 2010, proving his abilities to lead both the directorate and the Advanced Photon Source Upgrade project effort. He is a recognized and widely known world leader in X-ray science with vast knowledge and expertise in synchrotrons, beamlines, and instrumentation. He received an R&D 100 award

7

Stephenson Appointed ALD for Photon Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

APS, Other DOE Labs Help Develop New Cancer Fighting Drug APS, Other DOE Labs Help Develop New Cancer Fighting Drug Paper on Fast Pharmaceuticals by APS Authors Featured in New Journal Art Scene Investigation: Picasso goes Nanotech Linda Young of APS Elected Vice Chair of DAMOP Moffat of BioCARS and U. of C. Receives 2011 ACA Patterson Award APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Stephenson Appointed ALD for Photon Sciences SEPTEMBER 7, 2011 Bookmark and Share Brian Stephenson Argonne National Laboratory Director Eric D. Isaacs announced today that Brian Stephenson has been appointed Associate Laboratory Director (ALD) for Photon Sciences, effective September 1, 2011. The directorate comprises three research and support divisions centered on Argonne's

8

Update on APS Upgrade Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

AAI August 1, 2007 2 Upcoming Accelerator Events USPAS 2008 Winter School - University of California, Santa Cruz January 14-25, 2008 USPAS 2009 Summer School - University of Maryland, June 16-27, 2008 3 USPAS sponsored by University of California at Santa Cruz and held in Santa Rosa, California January 14-25, 2008 (Applications accepted in the fall) Two-week courses: January 14-25, 2008 (each of the following full courses earns four UCSC quarter units) Fundamentals of Charged Particle Optics in High Energy Accelerators (undergraduate credit), Michael Syphers, Fermilab Accelerator Physics, Vladimir Litvinenko, Brookhaven National Lab Microwave Measurement and Beam Instrumentation Laboratory, Derun Li, Lawrence Berkeley National Laboratory, Robert Rimmer, Jefferson Lab and

9

APS News 2011 | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Moffat Appointed Senior Advisor for Life Sciences at the APS Moffat Appointed Senior Advisor for Life Sciences at the APS Moffat Appointed Senior Advisor for Life Sciences at the APS November 30, 2011 Prof. Keith Moffat of the University of Chicago has been appointed Senior Advisor for Life Sciences at the APS to provide a stronger linkage between the Advanced Photon Source and the life sciences community. Gluskin of ASD Elected to AAAS Fellowship Gluskin of ASD Elected to AAAS Fellowship December 2, 2011 Efim Gluskin of the Argonne Accelerator Systems Division has been elected to Fellowship in the American Association for the Advancement of Science "for leadership in the development of ultra-bright x-ray sources utilized at third generation synchrotron sources and x-ray lasers." Jacobsen of XSD Elected to American Physical Society Fellowship

10

APS Experiment Safety Review Board  

NLE Websites -- All DOE Office Websites (Extended Search)

Charter for the APS Experiment Safety Review Board May 12, 2011 1. Purpose The APS Experiment Safety Review Board (ESRB) advises the AES Division Director on the safe implementation of experiments performed by APS users on the experiment hall floor. The ESRB reviews each experiment that is submitted to the APS via the APS Experiment Safety Assessment System (ESAF). These experiments are conducted in beamline endstations in the APS Experiment Hall. 2. Membership The ESRB members are appointed by the AES Division Director. The current members of the ESRB are: Bruce Glagola AES - Chair Edmund Chang AES Paul Rossi XSD Nena Moonier AES Tom Barkalow PSC Patricia Pedergnana AES Wendy VanWingeren AES 3. Method After an experiment is submitted to the APS Experiment Safety Review system

11

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network (OSTI)

1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF THE UNIVERSITY LIBRARIAN University Policy PURPOSE 1.00 The following procedures define the method by which the appointment, or review and re-appointment, of the university librarian will be conducted. SCOPE 2.00 These procedures apply to: the appointment of a new

Victoria, University of

12

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network (OSTI)

Page | 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF DEANS University Policy No: GV0450 procedures define the method by which the appointment, or review and re-appointment, of deans will be conducted. SCOPE 2.00 These procedures apply to: the appointments of new deans, the review and re

Victoria, University of

13

APPOINTMENTS, PROMOTION AND TENURE DOCUMENT APPOINTMENTS, PROMOTION AND TENURE  

E-Print Network (OSTI)

APPOINTMENTS, PROMOTION AND TENURE DOCUMENT - 1 - APPOINTMENTS, PROMOTION AND TENURE Criteria Approved by the Office of Academic Affairs 03/19/09 #12;APPOINTMENTS, PROMOTION AND TENURE DOCUMENT - 2...........................................................................................................5 A. Criteria 5 1. Regular Tenure Track Faculty

14

Zimbra for APS Users  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar Calendar Zimbra Calendar  ZWC Benefits: - Usable lab-wide, can schedule meetings with users and rooms outside APS - User friendly  Each Zimbra user has a personal calendar - Users migrated from Sun Calendar System optionally elected to migrate data from their personal calendar  With Zimbra, calendar terminology: - Appointments - Events - Meetings  Users can: - Create appointments - Create recurring events - Schedule all day events - Accept/Tentative/Reject an invitation with one click - Create additional calendars - Share their calendars with other users on and off-site - Delegate calendar management - Accept calendar shares - View calendar in various ways and print - Use color for quick calendar recognition - Schedule meetings * View multiple calendars to see potential scheduling

15

APS User News, Issue 65  

NLE Websites -- All DOE Office Websites (Extended Search)

5, November 1, 2010 5, November 1, 2010 CONTENTS DIRECTOR'S CORNER SCIENCE NEWS 1. Science Highlights USER MATTERS 2. New Badges for APS Users 3. APSUO Goes to Washington! 4. New Biosafety Web Page Available 5. Two New ANL Procedures: Injuries and Illnesses and Incident Notification FACILITY NEWS 6.Call for Workshop Proposals for APS/CNM/EMC Users Meeting 7. Cross-cut Review of APS X-ray Interface and Liquid Surface Scattering Science Held on October 6 8. APS SAC Meets, Sets Review Process for Scientific Priorities in APS-U 9. APS Upgrade on You Tube BRIEFLY NOTED -- Second Annual Meeting of the Prairie Section of the American Physical Society, November 18-20, 2010 -- PhD Scholarship on Virus Surrogate in New Zealand ===================================================== Instructions for subscribing, unsubscribing, and submitting info

16

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network (OSTI)

Page | 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF ACADEMIC ASSOCIATE VICE Review: February, 2018 PURPOSE 1.00 The following procedures define the method by which the appointment.00 These procedures apply to the appointment and reappointment of academic Associate Vice-Presidents. An Academic

Victoria, University of

17

Temporary Appointments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Temporary Appointments Temporary Appointments Temporary Appointments A temporary appointment is a non-permanent time limited appointment for a period of 1 year. It can be extended up to the maximum of one year (total 24 months). After the first year, the appointment allows eligibility for health benefits coverage. The employee pays the full cost for the health benefits. Reasons for making a temporary appointment include but are not limited to: short term position (less than 1 year), reorganization, contracting of function, anticipated reduction in funding, or the need to place permanent employees who would otherwise be displaced from other parts of the organization. An agency can not fill a position by temporary appointment if that position has previously been filled by temporary appointment(s) for a period of 2

18

APS Science 2009.  

SciTech Connect

It is my pleasure to introduce the 2009 annual report of the Advanced Photon Source. This was a very good year for us. We operated with high reliability and availability, despite growing problems with obsolete systems, and our users produced a record output of publications. The number of user experiments increased by 14% from 2008 to more than 3600. We congratulate the recipients of the 2009 Nobel Prize in Chemistry-Venkatraman Ramakrishnan (Cambridge Institute for Medical Research), Thomas Steitz (Yale University), and Ada Yonath (Weizmann Institute) - who did a substantial amount of this work at APS beamlines. Thanks to the efforts of our users and staff, and the ongoing counsel of the APS Scientific Advisory Committee, we made major progress in advancing our planning for the upgrade of the APS (APS-U), producing a proposal that was positively reviewed. We hope to get formal approval in 2010 to begin the upgrade. With advocacy from our users and the support of our sponsor, the Office of Basic Energy Sciences in the Department of Energy (DOE) Office of Science, our operating budgets have grown to the level needed to more adequately staff our beamlines. We were also extremely fortunate to have received $7.9 M in American Recovery and Reinvestment Act ('stimulus') funding to acquire new detectors and improve several of our beamlines. The success of the new Linac Coherent Light Source at Stanford, the world's first x-ray free-electron laser, made us particularly proud since the undulators were designed and built by the APS. Among other highlights, we note that more than one-quarter of the 46 Energy Frontier Research Centers, funded competitively across the U.S. in 2009 by the DOE, included the Advanced Photon Source in their proposed work, which shows that synchrotron radiation, and the APS in particular, are central to energy research. While APS research covers everything from fundamental to applied science (reflected by the highlights in this report), the challenge of sustainable energy provides an opportunity for expanded involvement with industrial research. We were privileged to recruit several outstanding new leaders at the APS. Linda Young, from Argonne's Chemical Sciences Division, became the new Director of the X-ray Science Division (XSD). Chris Jacobsen (from Stony Brook University) has been added to Linda's team as an XSD Associate Division Director, joining George Srajer. Alexander (Sasha) Zholents (formerly of Berkeley Lab) became Director of the Accelerator Systems Division. Sasha is the inventor of the short-pulse x-ray scheme that we plan to implement in the APS-U to obtain very high average brightness, broadband, 1-ps x-ray pulses. Walter Lowe (formerly of Howard University) has taken a new position as senior advisor for outreach and development of the user community. Walter's role is to increase the diversity of the user community (with diversity read broadly to include users, institutions, and technical disciplines that are underrepresented at APS). Walter is also leading an effort to increase access for industrial users. I am confident that we have in place a great team to help our users and the APS take fullest advantage of the APS-U opportunity. In planning with users for the proposed APS-U, we focused on the need to study 'real materials under real conditions in real time' on spatial and temporal scales unavailable today. Only by studying materials as they are made-or as they perform-in difficult environments can we solve the grand challenge of higher-performance, sustainable materials for energy and health. The proposed APS-U will improve the brightness of penetrating x-rays produced by the APS over 100 times, and support our efforts in developing state-of-the-art instruments to address these challenges.

Gibson, J. M; Mills, D. M.; Gerig, R.

2010-05-01T23:59:59.000Z

19

Term Appointments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Term Appointments Term Appointments Term Appointments A term appointment is a non-permanent time limited appointment for a period of more than 1 year but not more than 4 years. The appointment allows eiligibility for benefits and retirement coverage. Reasons for making a term appointment include but are not limited to: project work, extraordinary workload, scheduled abolishment, reorganization, uncertainty of future funding, or the need to maintain permanent positions for placement of employees who would otherwise be displaced from other parts of the organization. OPM may authorize exceptions beyond the 4-year limit when the extension is appropriately justifiable. For example, if the deadline of a major project is extended and the employee's term appointment is at the end of its time

20

Appointments Policy 4.20  

E-Print Network (OSTI)

Appointments Policy 4.20 Office of Human Resources Applies to: Staff The Ohio State University ­ Office of Human Resources policy.hr.osu.edu Page 1 of 1 Resources Alternative Retirement Plan, hr.osu.edu/benefits/rb_arp Benefit Eligibility by Appointment, hr.osu.edu/Policy/empben Faculty Appointments Policy, oaa

Howat, Ian M.

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

APS User News, Issue 71  

NLE Websites -- All DOE Office Websites (Extended Search)

1, August 18, 2011 1, August 18, 2011 CONTENTS 1. DIRECTOR'S CORNER USER MATTERS 2. How to Wow! "Secrets" for a Successful Proposal 3. Sweet Dreams Mean Safer Work 4. XSD's Linda Young Elected DAMOP Vice Chair 5. Successful 2011 APS/IIT Summer XAFS School BRIEFLY NOTED -- John Quintana Appointed Argonne's Deputy COO -- 2011 X-Ray Spectroscopy of Magnetic Solids Workshop Set for October 22-23 -- Workshops on Hard X-ray Instrumentation at the SwissFEL -- Next GUP Deadline is October 28, 2011 ===================================================== Instructions for subscribing, unsubscribing, and submitting info http://www.aps.anl.gov/Users/Communications/User_News/ ===================================================== DIRECTOR'S CORNER During the last week of July, we had the annual review of APS organized by

22

APS User News-at-a-Glance, Issue 45  

NLE Websites -- All DOE Office Websites (Extended Search)

5: November 30, 2007 5: November 30, 2007 Advanced Photon Source Argonne National Laboratory www.aps.anl.gov ============================================ CONTENTS MESSAGE FROM MURRAY --Extensive U of C Review Completed SCIENCE NEWS 1. HOLD THE DATE: Upgrade Workshop October 20-21, 2008 2. Featured Beamline: GISAXS at 8-ID-E, Focusing on Nanoscience USER MATTERS 3. Ten Tips for an Easy ESAF FACILITY NEWS 4. Update on XOR Beamline Upgrades 5. APS Response to Violations of APS and Argonne Policies by Users BRIEFLY NOTED -- FY2008 Schedule Posted -- Laboratory Closed for Holidays ---------------------------------------------------------------------------------------------- Instructions for subscribing, unsubscribing, and submitting info: http://www.aps.anl.gov/Users/Communications/User_News/

23

PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT  

E-Print Network (OSTI)

Page 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF RESEARCH CENTRE DIRECTORS University: Mandated review: January, 2017 PURPOSE 1.00 The purpose of these procedures is to provide direction at the University of Victoria. PROCEDURES 2.00 The processes provided in these procedures are intended

Victoria, University of

24

APS User Newse 2013 Year-End Index  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 APS User News Year-End Index 2013 Issue 84 (08.28.13) DIRECTOR'S CORNER APS UPGRADE NEWS by George Srajer, APS Upgrade Director USER MATTERS -- Three-Way Meeting Hosted at APS -- Tech Tuesdays -- Get Your Geek On: NUFO Goes to Capitol Hill -- APS User Program: New Roles -- Nobel Laureate Keynote Address Kicks Off Record-breaking Users Meeting -- APS Science 2012 Research and Engineering Highlights--Get Yours Today! -- APS Data Management Practices -- Quiet Vehicle Hazards BRIEFLY NOTED -- 2013 Arthur H. Compton Award Recognizes "Top-Up" Operation Founders -- Art of Science Entries Sought! -- Next U.S. Particle Accelerator School -- Scientific American Blog Highlights the Need for Scientists to Do Own

25

APS User News, Issue 62  

NLE Websites -- All DOE Office Websites (Extended Search)

2, June 21, 2010 2, June 21, 2010 CONTENTS MESSAGE FROM MURRAY SCIENCE NEWS 1. Jaramillo Recognized for Techniques to Study Quantum Effects at High Pressure 2. Science Highlights USER MATTERS 3. APS Upgrade Seminar Series Scheduled for Summer Months 4. APS Beam Time Request System Goes Full Time FACILITY NEWS 5. Proposal Deadline July 9, for 2010-3 Run Cycle 6. Twenty Years of Groundbreaking Science and Beyond! 7. Workshop Summaries from the 2010 APS/EMC Users Meeting Available Online 8. New APSUO Members Elected 9. NUFO Report BRIEFLY NOTED -- First North American Core Shell Spectroscopy Conference: August 2-6, 2010 -- The 10th International Conference on X-ray Microscopy: August 15-20, 2010 -- Short Course on High Pressure Synchrotron Techniques: September 15-18, 2010 -- 16th Pan-American Synchrotron Radiation Instrumentation Conference:

26

APS User News, Issue 58  

NLE Websites -- All DOE Office Websites (Extended Search)

8, November 11, 2009 8, November 11, 2009 CONTENTS MESSAGE FROM MURRAY SCIENCE NEWS 1. Fast CCD Detector Collaboration 2. Science & Research Highlights The Power of Proteins: Prion Diseases Demystified Bacterium Helps in the Formation of Gold Getting to the Roots of Lethal Hairs Creating a Precise Atomic-Scale Map of Quantum Dots USER MATTERS 3. Users and the Flu Season 4. Workshop on the Role of Synchrotron Radiation in Solving Scientific Challenges in Advanced Nuclear Energy Systems 5. First Experiment at the Linac Coherent Light Source 6. New Postings Available on Employment Bulletin Board FACILITY NEWS 7. Recent SAC Meeting Focuses on APS Upgrade 8. The Life Sciences Council at the APS 9. Fitness Center Now Open in New Location AWARDS AND HONORS 10. APS Users Awarded 2009 Nobel Prize in Chemistry

27

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network (OSTI)

Page 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF THE ASSOCIATE DEAN ACADEMIC ADVISING Last Editorial Change: Mandated Review: May, 2018 PURPOSE 1.00 The following procedures define (Faculties of Science, Social Sciences and Humanities) will be conducted. SCOPE 2.00 These procedures apply

Victoria, University of

28

APS Radioactive Sample Safety Review Committee  

NLE Websites -- All DOE Office Websites (Extended Search)

Radioactive Sample Safety Review Committee Radioactive Sample Safety Review Committee March 6, 2012 1. Purpose The APS Safety Radioactive Sample Safety Review Committee (RSSRC) advises the AES Division Director on the radioactive samples to be used at the APS and the adequacy of controls in place for the duration of their use. The RSSRC reviews the radioactive material samples proposed to be run at the APS to ensure that they fall within established safety envelopes of the APS. 2. Membership The RSSRC members are appointed by the AES Division Director. The current members of the RSRC are: B. Glagola AES - Chair S. Davey AES G. Pile AES L. Soderholm CHM J. Vacca RSO W. VanWingeren AES M. Beno XSD E. Alp XSD M. Rivers PUC 3. Method The AES User Safety Coordinator will notify the RSSRC of any samples

29

APS User News-at-a-Glance, Issue 3  

NLE Websites -- All DOE Office Websites (Extended Search)

Contents: New Argonne Director Tours APS Holiday Closings Announced First APS User Activity Report Posted on the Web APS User Statistics Be Generous this Season: Share Your Research Results with Colleagues! APS User News-at-a-Glance Issue 3; December 13, 2000 All of us at the Advanced Photon Source wish you a happy holiday season and a scientifically productive new year! 1. New Argonne Director Tours APS (Contact: gks@aps.anl.gov) Photo of Hermann Grunder During a recent tour of the APS, Hermann Grunder, newly appointed Director of Argonne National Laboratory, expressed great enthusiasm for the quality and diversity of scientific research being conducted here. Grunder walked the complete accelerator complex, beginning in the Linac, viewing the Low Energy Undulator Test Line, walking through

30

APS User News-at-a-Glance, Issue 4  

NLE Websites -- All DOE Office Websites (Extended Search)

4; February 5, 2001 4; February 5, 2001 Contents: 1. Moncton Announces Return to the APS Full-time Call for Submissions: APS User Activity Report 2000 Argonne Guest House Upgrades Telephone System APS Compton Award Nominations: First Call What's Ahead? 1. Moncton Announces Return to the APS Full-time (Contact: rt@aps.anl.gov) In a memo to APS staff, dated January 23, 2001, David Moncton announced his intention to return to Argonne and resume full-time responsibilities as Associate Laboratory Director for the APS effective March 1, 2001. This date marks the end of his two-year commitment to the Spallation Neutron Source (SNS) project at Oak Ridge. In describing his decision, Moncton mentioned the rewarding challenge posed by the SNS project and expressed his pride in the contributions made by APS staff

31

AP R  

Office of Legacy Management (LM)

. . aw wL2--\ AP R 2 2 i386 NE-23 Elimination of the Chupadera Mesa and Los Alamos County Industrial Waste Line Sites from Further Consideration for FUSRAP Inclusion Carlos E. Garcia, Director Environmental Safety and Health Division Albuquerque Operations Office The enclosed material is being provided to you to document the final actiors taken under the Department's Formerly Utilized Sites Remedial Action Program (FUSRAP) for the Chupadera Kesa area and the Los Alamos County Industrial Waste Lines, New Mexico. Copies of designation/ elimination reviews for each of the sites are enclosed for your records. he have determined tiiat neither site warrants inclusion in the remedial action program. Primary source, c of data for this determination were two

32

Advanced Offshore Solutions ApS AOS | Open Energy Information  

Open Energy Info (EERE)

Offshore Solutions ApS AOS Jump to: navigation, search Name: Advanced Offshore Solutions ApS (AOS) Place: Tranbjerg, Denmark Zip: 8310 Sector: Wind energy Product: Denmark-based...

33

Appointments, Promotion & Tenure Document Department of Geography  

E-Print Network (OSTI)

Appointments, Promotion & Tenure Document Department of Geography Based on Approved 2004 Revision ....................................................................................................................................................... 2 1. Criteria: Tenure Track Faculty....................................................................................... 3 4. Procedures: Tenure Track Faculty

34

APS Users Organization  

NLE Websites -- All DOE Office Websites (Extended Search)

APSUO APSUO By-Laws Steering Commitee Employment Meetings Compton Award Franklin Award APS Users Organization The APSUO is responsible for advising the APS Associate Laboratory Director in the following areas: The Organization will serve as an advocacy group for the Facility and its user community. The Organization will provide advice to the ALD on matters affecting the user community. The Organization will assure good communication between the APS user community and the APS management. APSUO By-Laws The by-laws upon which the APS User Organization is based. List of Steering Committee Members Steering committee for the APS Users Organization. Employment Bulletin Board APS-related employment opportunities. APSUO Steering Committee Meetings Minutes and presentations from the APSUO meetings.

35

PROCEDURES FOR THE SEARCH, APPOINTMENT, OR REAPPOINTMENT  

E-Print Network (OSTI)

1 PROCEDURES FOR THE SEARCH, APPOINTMENT, OR REAPPOINTMENT OF THE PRESIDENT AND VICE- CHANCELLOR of Senate establish procedures for the recommendation and selection of the President and shall subsequently appoint the President. The following procedures determine the method by which the Board of Governors

Victoria, University of

36

School of Communication Appointments, Promotion & Tenure Document  

E-Print Network (OSTI)

2012-13 School of Communication Appointments, Promotion & Tenure Document Table of Contents XV Tenure Track Faculty 2 b. Regular Clinical Faculty 4 c. Regular Auxiliary Faculty 4 2. Procedures 6 a. Regular Tenure Track Faculty 6 b. Regular Clinical Faculty 9 c. Courtesy Appointments for Regular Faculty

37

APS User News-at-a-Glance, Issue 38  

NLE Websites -- All DOE Office Websites (Extended Search)

39: September 26, 2006 39: September 26, 2006 Advanced Photon Source www.aps.anl.gov ============================================ CONTENTS MESSAGE FROM MURRAY 1. Upgrade Planning in High Gear FACILITY NEWS 2. Policy Changes Introduced for General Users: "Project" Proposals, Longer Durations 3. Proposal System Changed and Upgraded 4. Upgrade Update: Machine Advisory Committee Formed 5. Argonne Holds Open House--All Ages Welcome OPERATION NEWS 6. Schedule Published for Run 2007-1 7. Feedback Sought: 1296 Singlet Mode to Be Discontinued 8. Feedback Sought: RHB Lattice Proposed as Standard, Watch Performance in October 9. Data Transfer Speeds: Networking at Argonne and the APS 10. Heat-Wave Heroes BRIEFLY NOTED --Applications Sought for Argonne Named Postdoctoral Fellowships (up to

38

APS User News-at-a-Glance, Issue 37  

NLE Websites -- All DOE Office Websites (Extended Search)

7: June 14, 2006 7: June 14, 2006 Advanced Photon Source www.aps.anl.gov ============================================ CONTENTS MESSAGE FROM MURRAY: APS Upgrade Proposal To Be Completed October 31 SCIENCE NEWS 1 . Featured Organization: Synchrotron-Related Theory Group, X-ray Science Division 2 . Research Highlights FACILITY NEWS 3. Update on XOR Beamline Upgrades: Sectors 1, 11, 12, and 32 4. Reorganization Centralizes Support for User Science 5 . Eighteen Beamlines Open to Partner Users: Proposals Due July 14 6 . Four Join APS Users Organization Steering Committee OPERATIONS NEWS 7 . Fall Schedule Features New Lattice 8 . Electrical Safety Requirements Prompt New Training, Inspections PEOPLE NEWS --Wendy L. Mao, 2006 Rosalind Franklin Young Investigator Award --Gabrielle Long, Division Director, X-ray Science Division

39

APS 2003 Conferences  

NLE Websites -- All DOE Office Websites (Extended Search)

conferences and workshops of interest to the APS researcher community. Frontiers of Grid Computing and Simulation at Nano-Bio Interface. (Feb. 27- Mar. 1) Baton Rouge, LA....

40

APS Conference Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Photon Source Conference Center The APS Conference Center at Argonne National Laboratory is the ideal location for scientific and professional meetings. The Center can...

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

APS SAC Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

APS Scientific Advisory Committee Policy Adopted 1/21/2003 The Scientific Advisory Committee (SAC) inherits and expands the role of the former Program Evaluation Board (PEB). It advises the Associate Laboratory Director for the APS (ALD/APS) with the following responsibilities: Scope To evaluate the scientific output and facility utilization for all APS sectors. To examine performance and recommend appropriate beamtime allocation for existing Collaborative Access Teams (CATs). To evaluate Letters of Intent and scientific proposals for new and reconstituted CATs. To provide advice to and review decisions by APS management on special operations support for CATs. To review proposals for Partner User access, a new access mode that will guarantee 10-30% the beam time per year on any sector for a finite

42

APPOINTMENT TO STUDENT'S COMMITTEE STUDENT NAME  

E-Print Network (OSTI)

APPOINTMENT TO STUDENT'S COMMITTEE STUDENT NAME: I understand and take responsibility for carrying out the obligations of serving on the above MPS student's committee: · Provide guidance and assistance with student internship selection and acquisition; · Approve

Miami, University of

43

Certified APS Electrical Equipment Inspectors  

NLE Websites -- All DOE Office Websites (Extended Search)

APS Designated Electrical Equipment Inspectors : Division Phone Page e-mail Jonathan Baldwin XSD 2-6977 4-6977 jbaldwin@aps.anl.gov Adam Brill ASD 2-9968 4-4559 abrill@aps.anl.gov...

44

APS User News-at-a-Glance, Issue 33  

NLE Websites -- All DOE Office Websites (Extended Search)

3: August 25, 2005 3: August 25, 2005 Advanced Photon Source www.aps.anl.gov ============================================ CONTENTS SCIENCE NEWS 1. Recent Highlights ---Characterizing Complete Metal-Cluster Proteins ---"Cookbook Recipes" Would Cure Disease with Nontoxic DNA Delivery Systems ---Other Science Headlines 2. September Workshops Probe New Directions in Catalysis, Surface/Interface Science 3. Three APS Employees Win R&D 100 Award for Nanoprobe Lens 4. Magazine Ranks Illinois Highest for Biotechnology 5. Getting Noticed: Your Press Releases Can Help the APS Too 6. APS Science 2004 and Strategic Plan Report Now Available FACILITY NEWS 7. Work Beginning on Initial XOR Beamline Upgrades 8. GM/CA-CAT Dedicates Dual-Undulator Beamlines at Sector 23 9. Partner User Council Adopts New Charter and Elects Chair

45

APS - Residential Energy Efficient Rebate Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APS - Residential Energy Efficient Rebate Program APS - Residential Energy Efficient Rebate Program APS - Residential Energy Efficient Rebate Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Sealing Your Home Ventilation Heat Pumps Appliances & Electronics Windows, Doors, & Skylights Maximum Rebate Duct Repairs: $250 Sealing Air Leaks: $250 Attic Insulation: $250 Pool Pumps: $200 Program Info State Arizona Program Type Utility Rebate Program Rebate Amount Heat Pumps/AC Units: $270 Insulation, Duct Repair and Air Sealing: 75% of cost Refrigerator Recycling: $30 Lighting: Store Discounts APS offers a $270 rebate to its residential customers who upgrade their AC units or heat pumps. AC units must meet both the SEER and EER values and be

46

APS User Newse 2010 Year-End Index  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 APS User News Year-End Index 2010 Issue 60 (02.19.10) 1. February 22nd Deadline for Nominations for the 2010 APSUO Rosalind Franklin Award 2. APS Proposal Deadline is March 5, 2010, for the 2010-2 Run Cycle 3. APSUO Steering Committee Seeking Potential Nominees 4. Dates to Remember Issue 61 (03.10.10) 1. February 22nd Deadline for Nominations for the 2010 APSUO Rosalind Franklin Award 2. APS Proposal Deadline is March 5, 2010, for the 2010-2 Run Cycle 3. APSUO Steering Committee Seeking Potential Nominees Issue 62 (03.10.10) MESSAGE FROM MURRAY SCIENCE NEWS 1. Jaramillo Recognized for Techniques to Study Quantum Effects at High Pressure 2. Science Highlights USER MATTERS 3. APS Upgrade Seminar Series Scheduled for Summer Months

47

APS Upgrade - Creating a Better Quality of Life | Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

-Site environmental protection --Site waste management -Site sustainability --Site pollution prevention Operations -Business diversity -Technology transfer -Procurement -Human...

48

APS Scientific Advisory Committee  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientific Advisory Committee (SAC) Scientific Advisory Committee (SAC) The SAC is responsible for advising the APS Associate Laboratory Director in the following areas: To evaluate the scientific output and facility utilization for all APS sectors. To examine performance and recommend appropriate beamtime allocation for existing Collaborative Access Teams (CATs). To evaluate Letters of Intent and scientific proposals for new and reconstituted CATs. To provide advice to and review decisions by APS management on special operations support for CATs. To review Special Program proposals, a new mode of access that will guarantee 10-30% the beam time per year on any sector for a finite period of time. To assist the APS with development of policies and other issues as appropriate. SAC members Participants in the Scientific Advisory Committee.

49

ARM - Campaign Instrument - aps  

NLE Websites -- All DOE Office Websites (Extended Search)

you Send us a note below or call us at 1-888-ARM-DATA. Send Campaign Instrument : Aerodynamic Particle Sizer (APS) Instrument Categories Aerosols Campaigns Application of the...

50

APS News 2000  

NLE Websites -- All DOE Office Websites (Extended Search)

0 National School on Neutron and X-Ray Scattering Held at APS & IPNS (Aug. 14) Photo of Nicole Murphy and students During the two-week period of August 14-26, 2000 Argonne National...

51

E-Print Network 3.0 - appointments and schedules Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

students are required to schedule routine appoint-ments with their respective academic advisor. Summary: All EOFPEPCARR students are required to schedule routine appoint- ments...

52

About Your APS Badge  

NLE Websites -- All DOE Office Websites (Extended Search)

About Your APS Badge About Your APS Badge Facts, responsibilities, and privileges associated with an APS badge. Facts Your badge number is the largest 5 or 6-digit number on the back of the badge (do not use the letters or leading zero). Non-U.S. citizens: Your badge is valid for 2 years from the date of approval for access. According to U.S. Department of Energy requirements, your badge must be red and must display your country of citizenship and the expiration date. Students who are U.S. citizens: Your badge is valid for 2 years from issuance and displays the expiration date. A badge will be issued only if a user agreement is in place (and for non-U.S. citizens, if an indices check has been completed). Responsibilities You must wear your badge in view at all times while on the Argonne

53

2010 APS.xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Allison to Marcinowski SUBJECT: NEPA 2010 APS for DOE-SRS Allison to Marcinowski SUBJECT: NEPA 2010 APS for DOE-SRS *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain tbd FONSI: uncertain Total Estimated Cost tbd Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-10 Estimated Schedule (**NEPA Milestones) DOE SRS expects to initiate one or more new EAs over the next 12 months. * Please include projected NEPA milestones, if planned. 1 of 6 Annual NEPA Planning Summary (2010) DOE Savannah River Site Attachment: Memo, Allison to Marcinowski SUBJECT: NEPA 2010 APS for DOE-SRS *Title, Location Estimated Cost Description Determination Date:

54

Appointment of Contracting Officers and Contracting Officer Representatives  

Directives, Delegations, and Requirements

To establish procedures governing the selection, appointment, and termination of contracting officers and for the appointment of contracting officer representatives. Cancels DOE Order 4200.4A. Canceled by DOE O 541.1A.

1996-04-30T23:59:59.000Z

55

Printing a poster? Make an appointment!  

E-Print Network (OSTI)

Printing a poster? Make an appointment! Sizing your poster correctly: The first step in successfully printing a poster is making sure that you have your document sized correctly. The poster printer has a maximum width of 42" (all posters will be printed on size 42" paper.) Length can vary beyond

Niebur, Ernst

56

Name: _________________________________ ID: __________________________________ Follow-up Appointment: __________________ Advisor: _____________________________  

E-Print Network (OSTI)

was placed on your spring registration. In order to register for spring quarter you will need to complete are not limited to one appointment. See us as often as you'd like. Strategies for a Successful College Experience:_________________ Worksheet: Campus Resource Visit Please choose one of the following resources to visit and utilize

57

APS User News-at-a-Glance, Issue 32  

NLE Websites -- All DOE Office Websites (Extended Search)

2: June 29, 2005 2: June 29, 2005 Contents 1. Message from Murray: XOR Tactical Plan Evolves; Three Upgrades Chosen 2. Science Highlight: Sequence to Structure in DNA 3. New Technique Captures Submicrosecond Images Using White Beam; Work Garners Argonne Award 4. Operating Mode Changes Decided for Summer Run 5. Proposal Deadlines Approaching: July 15 6. Crystallographic Exposure: APS at ACA 7. Four Elected to APS Users Organization Steering Committee 8. 2005 Users Meeting: A Rich Sampling of Science Past, Present, and Future --Briefly Noted subscribe to News Flash from lightsources.org meeting notice: neutron macromolecular crystallography at SNS, July 12-13 meeting notice: surface and interface characterization at APS, Sept. 8-9 meeting notice: Synchrotron Environmental Science III at Brookhaven,

58

Irrigation Hardware Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

because the water discharge point is closer to the ground reducing wind drift of the water. Efficiency upgrades are also available for wheel line hubs and levelers. Please...

59

Capturing Energy Upgrades  

Energy.gov (U.S. Department of Energy (DOE))

Provides an overview of how to capture the value of energy efficiency upgrades in the real estate market, from CNT Energy.

60

The APS and You | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar of Events APS News User News Article Archives APS Brochure Annual Reports Posters Podcasts Image Gallery external site Video Library Syndicated Feeds (RSS) The APS and...

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

APS User News-at-a-Glance  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar of Events APS News User News Article Archives APS Brochure Annual Reports Posters Podcasts Image Gallery external site Video Library Syndicated Feeds (RSS) APS User...

62

COLLEGE OF SOCIAL WORK Appointment, Promotion and Tenure Document  

E-Print Network (OSTI)

COLLEGE OF SOCIAL WORK Appointment, Promotion and Tenure Document Updated December, 2009 Approved OF CONTENTS Page I. PREAMBLE 1 II. COLLEGE MISSION 1 III. APPOINTMENTS A. Criteria 1. Tenure Track Faculty 2 a. Emeritus Faculty 4 B. Procedures 1. Tenure Track Faculty 4 2. Auxiliary Faculty 5 3. Zero FTE Appointments

63

POLICY GUIDANCE MEMORANDUM #32A Schedule A Appointments of Persons with Disabilities and Appointments for Disabled Veterans  

Energy.gov (U.S. Department of Energy (DOE))

Establishes policy and procedures that ensure Schedule A appointments and appointments for disabled veterans are in support of mission accomplishments and are in accordance with merit system principles, applicable laws, and regulations.

64

APS Today: Calendar of Events  

NLE Websites -- All DOE Office Websites (Extended Search)

aps.anl.gov/News/APS_Today Upcoming events at the Advanced aps.anl.gov/News/APS_Today Upcoming events at the Advanced Photon Source at Argonne National Laboratory. en-us Argonne National Laboratory http://www.aps.anl.gov/Images/argonne_header_logo_white.jpg http://www.aps.anl.gov/News/APS_Today 227 100 Engineering the Elasticity of Soft Colloidal Materials Through Surface Modification and Shape Anisotropy posted 2014-01-08 @ 3:57pm 2014-01-13 11:00:00 401-A1100 XSD Presentation Wave Propagation Through Random Media: Branched Flow from Acoustics to Ocean Waves http://www.aps.anl.gov/News/Meetings/APS_Colloquium/ posted 2014-01-09 @ 12:40pm 2014-01-15 15:00:00 402-AUD APS Colloquium User Science Seminar http://www.aps.anl.gov/News/Meetings/User_Seminars/ posted 2013-12-05 @ 2:20pm 2014-01-31 12:00:00 401-A1100 APS Seminar User Science

65

DOE Guidance - Permanent and Nonpermanent Positions, Appointments, &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance - Permanent and Nonpermanent Positions, Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Guidance Memorandum #23 DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes This document provides assistance in determining whether a new position should be designated as permanent or nonpermanent (temporary), to provide examples of the various types of appointments and personnel actions that can be used with position determinations, and to define the associated Corporate Human Resource Information System (CHRIS) position codes. Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov

66

DOE Guidance - Permanent and Nonpermanent Positions, Appointments, &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance - Permanent and Nonpermanent Positions, Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Guidance Memorandum #23 DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes This document provides assistance in determining whether a new position should be designated as permanent or nonpermanent (temporary), to provide examples of the various types of appointments and personnel actions that can be used with position determinations, and to define the associated Corporate Human Resource Information System (CHRIS) position codes. Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov

67

Logos 2001 APS Articles  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 A quarterly magazine about Argonne research. The Argonne Logos articles in this section focus on APS-related research. Volume 19, no. 2 - Fall 2001 Argonne's SBC provides a close look at life's construction workers Diagram of X-ray crystallography at teh APS Evidence of human construction work is all around us: on the roads we travel, in the buildings we occupy and now even in outer space... But one form of "human construction" quietly does its job without making the daily news or creating the slightest bit of noise or inconvenience, unless its machinery goes highly awry. This is the construction that has gone on inside every human cell - and probably every cell that has ever existed - since life began on Earth 3.5 billion years ago. Right now these cellular construction workers, called

68

Recommendation for Appointment Electronic Commerce Contracting Officer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendation for Appointment Recommendation for Appointment Electronic Commerce Contracting Officer The following findings and determinations are made pursuant to applicable laws and regulations. There is a clear and convincing need to delegate electronic commerce contracting authority [attach a Statement of Need]. 2. ___________________________________ [insert nominee name], the nominee, is an employee of, or is detailed to the U.S. Department of Energy, or is an employee of a DOE Management and Operating Contractor _____________________________________________________________________. [insert DOE Office or M&O contractor name]. 3. The requested single purchase limit for the nominee is $25,000.00. |* Requests must be supported by a justification which, at a minimum, must address: (a) a description of the types of items the nominee will purchase;

69

APS Safety Plan Review Committee  

NLE Websites -- All DOE Office Websites (Extended Search)

members are appointed by the AES Division Director. The current members of the SPRC are: Bruce Glagola AES - Chair Edmund Chang AES Paul Rossi XSD Steve Davey AES Nena Moonier AES...

70

Wave Dragon ApS | Open Energy Information  

Open Energy Info (EERE)

Dragon ApS Dragon ApS Jump to: navigation, search Name Wave Dragon ApS Place Copenhagen, Denmark Zip DK-2200 Country Albania Product Wave energy converter development company. Has patented the Wave Dragon, an offshore floating slack moored wave energy converter. Coordinates 55.6760968°, 12.5683371° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.6760968,"lon":12.5683371,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

71

In 2012, the faculty in the Department of Radiology endorsed using the College of Medicine's Appointments, Promotion, and Tenure Document (http://oaa.osu.edu/assets/files/documents/MED  

E-Print Network (OSTI)

of the new 2012 OSU College of Medicine (COM) AP&T document which redefines academic Tracks, Pathways&T document, there are 4 different Tracks leading to a total of 7 specific Pathways, by which 4 different's Appointments, Promotion, and Tenure Document (http://oaa.osu.edu/assets/files/documents/MED APT.pdf) rather

72

APS Protocol for  

NLE Websites -- All DOE Office Websites (Extended Search)

Protocol for Protocol for RECEIPT OF HAZARDOUS MATERIAL SHIPMENTS (Updated January 22, 2007) Scope & Application Throughout this document, the term hazardous material means any material regulated by the U.S. Department of Transportation as a hazardous material. This procedure governs APS Beamline acceptance of all packages known or suspected to contain hazardous materials. It applies not only to shipments delivered to Argonne National Laboratory by common carriers, but also to materials brought to the laboratory by researchers in personal, rental, or institutionally owned vehicles. There is no threshold quantity below which the procedure need not be followed. Purpose This procedure is intended to minimize the negative consequences that could result from

73

Biofuels : Upgraded New Solids  

Science Journals Connector (OSTI)

The main historical keywords for the three pathways are: Agglomeration: Briquettes are long-established upgraded solid fuels, especially based on coal. 1970s: first small scale pellet heating units build in t...

Dr. Marco Klemm; Ralf Schmersahl

2012-01-01T23:59:59.000Z

74

Biofuels : Upgraded New Solids  

Science Journals Connector (OSTI)

The main historical keywords for the three pathways are: Agglomeration: Briquettes are long-established upgraded solid fuels, especially based on coal. 1970s: first small scale pellet heating units build in t...

Dr. Marco Klemm; Ralf Schmersahl; Dr. Claudia Kirsten

2013-01-01T23:59:59.000Z

75

APS User News, Issue 82  

NLE Websites -- All DOE Office Websites (Extended Search)

2, November 6, 2012 2, November 6, 2012 CONTENTS DIRECTOR'S CORNER USER MATTERS -- APS User Wins Nobel Prize in Chemistry -- Physics, Picasso, and House Paint: X-rays Solve a Mystery -- CALL FOR: APS Workshop Proposals and Invited Speaker Suggestions--Due January 11, 2013! --"There's an app for APS!" BRIEFLY NOTED -- Welcome Susan White-DePace, Associate Manager for User Programs -- Nature.com Launches Scientific Reports -- Sidewalk Construction Begins from APS to Building 314 -- Newly Reduced Speed Limit in 201 Area -- Upcoming Meetings of Interest -- General User Proposal Deadline for Run 2013-2: March 8, 2013 -- Current APS Job Openings -- Save the Date: 2013 APS/CNM/EMC Users Meeting Set for May 6-9, 2013 ==================================================== Instructions for subscribing, unsubscribing, and submitting info

76

APS ES&H Committees  

NLE Websites -- All DOE Office Websites (Extended Search)

at the Laboratory range from approaching standing APS safety committees, formulating an Ad Hoc committee, approaching individuals recognized to be knowledgeable in a specialized...

77

? Westinghouse Completes its AP1000...  

NLE Websites -- All DOE Office Websites (Extended Search)

this Issue... Westinghouse Completes its AP1000 Test Stand VERA-CS Coupled Multi-physics Capability demonstrated in a Full-core Simulation TVA provides Watts Bar...

78

Appointment of Contracting Officers and Contracting Officer Representatives  

Directives, Delegations, and Requirements

The Order established procedures governing the selection, appointment and termination of Department of Energy contracting officers and contracting officer representatives. Cancels DOE O 541.1A.

2004-04-21T23:59:59.000Z

79

APS Colloquium 2001  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 The monthly APS Colloquium series is intended for the benefit of the Advanced Photon Source community as well as the Argonne community by bringing distinguished scientists in all disciplines to lecture on topics of general interest. Objectives include the cross-fertilization of research initiatives at various institutions and the identification of possible uses of the Advanced Photon Source. The lecturer is also invited to spend an additional day visiting with scientists at Argonne. LIGO and the Search for Gravitational Waves (Dec. 5) Barry Barish, California Institute of Technology (pdf) Chirped Hard X-ray Pulses and the Frontiers of Ultrafast, Time-Resolved, Macromolecular Crystallography (Nov. 7) Keith Moffat, The University of Chicago (pdf) Proteins Connect Biology, Chemistry, and Physics (Oct. 3)

80

APS News 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Physicists describe strange new fluid-like state of matter University of Chicago physicists have created a novel state of matter using nothing more than a container of loosely packed sand and a falling marble. They have found that the impacting marble produces a jet of sand grains that briefly behaves like a special type of dense fluid.Needing very fast, non-invasive tracking of the interior of the sand, the group used used high-speed x-ray radiography taken at 5,000 frames per second, the fastest ever at the Advanced Photon Source. (html) Grants fund collaborations by Argonne and U. of C. scientists using the APS Photo: UofC_logo The University of Chicago's Board of Governors for Argonne National Laboratory has selected seven proposals for 2005 Collaborative Research Seed Grants. Several of these proposals will utilize

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Operation of the APS photoinjector drive laser sytem  

NLE Websites -- All DOE Office Websites (Extended Search)

07 07 Rev. 1, June 2008 Operation of the APS Photoinjector Drive Laser System Yuelin Li Abstract The APS photoinjector drive laser system has been in operation since 1999 and is achieving a performance level exceeding the requirement of stable operation of the LEUTL FEL system. One remarkable number is the UV energy stability of better than 2% rms, sometimes less than 1% rms. This report summarizes the operation experience of the laser system and the improvements made along the way. We also outline the route of upgrade of the system and some frontier laser research and development opportunities in ultrabright electron beam generation. I. Introduction A photoinjector is the only way to generate the high-brightness beams required by fourth-

82

APS User News-at-a-Glance, Issue 55  

NLE Websites -- All DOE Office Websites (Extended Search)

5, July 8, 2009 5, July 8, 2009 CONTENTS MESSAGE FROM MURRAY SCIENCE NEWS 1. Beamline 11-BM Expands High-resolution Powder Diffraction Program, Now Accepting On-site Users 2. Science & Research Highlights USER MATTERS 3. Workshop: On-line Brillouin Spectroscopy--Basic Principles and Applications for High Pressure Research Supported by GSECARS and COMPRES 4. Workshop: July 29-31, 2009: Science Drivers for Hard X-ray Upgrades to LCLS 5. NUFO Meeting Explores Variety of Topics FACILITY NEWS 6. Argonne 's Bike Sharing Program Available to APS Users 7. The APS Employment Bulletin Board BRIEFLY NOTED -- General User Program Deadline for Cycle 2009-3 is July 10 -- SSRL/LCLS Users' Meeting and Workshop October 18-20, 2009 -- SXNS-11 Scheduled for July 14-17, 2010 =====================================================

83

APS User News-at-a-Glance, Issue 38  

NLE Websites -- All DOE Office Websites (Extended Search)

8: August 23, 2006 8: August 23, 2006 Advanced Photon Source www.aps.anl.gov ============================================ CONTENTS MESSAGES FROM MURRAY 1. Planning for the APS Upgrade Makes Major Progress 2. Call for Insertion Device and Front End Proposals from Sectors, Due December 1 SCIENCE NEWS 3. Research Highlights 4. 2007 Crosscut Review to Feature Structural Biology 5. Report on the Fifth Conference on Synchrotron Radiation in Materials Science (SRMS-5) FACILITY NEWS 6. DOE Awards New Contract for Operation of Argonne PEOPLE NEWS --Goodbye, Elane Streets (GUP Administrator) --Hello, Paul Rossi (ES&H Coordinator, XSD) BRIEFLY NOTED --Catalysis Interest Group Established --Proposals Sought for Jazz Computing Cluster, due September 5 (or ongoing) --Sub-Angstrom Microscopy and Microanalysis Facility

84

AP1000 Design for Security  

SciTech Connect

Nuclear power plants are protected from potential security threats through a combination of robust structures around the primary system and other vital equipment, security systems and equipment, and defensive strategy. The overall objective for nuclear power plant security is to protect public health and safety by ensuring that attacks or sabotage do not challenge the ability to safely shutdown the plant or protect from radiological releases. In addition, plants have systems, features and operational strategies to cope with external conditions, such as loss of offsite power, which could be created as part of an attack. Westinghouse considered potential security threats during design of the AP1000 PWR. The differences in plant configuration, safety system design, and safe shutdown equipment between existing plants and AP1000 affect potential vulnerabilities. This paper provides an evaluation of AP1000 with respect to vulnerabilities to security threats. The AP1000 design differs from the design of operating PWRs in the US in the configuration and the functional requirements for safety systems. These differences are intentional departures from conventional PWR designs which simplify plant design and enhance overall safety. The differences between the AP1000 PWR and conventional PWRs can impact vulnerabilities to security threats. The NRC addressed security concerns as part of their reviews for AP1000 Design Certification, and did not identify any security issues of concern. However, much of the detailed security design information for the AP1000 was deferred to the combined Construction and Operating License (COL) phase as many of the security issues are site-specific. Therefore, NRC review of security issues related to the AP1000 is not necessarily complete. Further, since the AP1000 plant design differs from existing PWRs, it is not obvious that the analyses and assessments prepared for existing plants also apply to the AP1000. We conclude that, overall, the AP1000 is less vulnerable to security threats such as malevolent use of vehicles (land, water or air), than are conventional PWRs. Further, the AP1000 is less vulnerable to external events (e.g., loss of transmission) than conventional PWRs. For some of the threats evaluated the AP1000 is comparable to conventional PWRs, while for other threats the AP1000 is inherently less vulnerable. (authors)

Long, L.B. [Southern Nuclear Operating Company, 40 Inverness Center Parkway, Birmingham, AL 35242 (United States); Cummins, W.E.; Winters, J.W. [Westinghouse Electric Company, 4350 Northern Pike, Monroeville, PA 15146 (United States)

2006-07-01T23:59:59.000Z

85

Cyclotron Institute Upgrade Project  

SciTech Connect

The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

2014-08-26T23:59:59.000Z

86

Policies and Procedures for Faculty Appointments, Reappointments, and  

E-Print Network (OSTI)

Policies and Procedures for Faculty Appointments, Reappointments, and Promotions at the Harvard and procedures outlined in this document have continued to evolve since they were last voted by the faculty;Table of Contents Policies and Procedures for Faculty Appointments, Reappointments, and Promotions

Chou, James

87

DEPARTMENT OF NEUROLOGY APPOINTMENTS, PROMOTION AND TENURE DOCUMENT  

E-Print Network (OSTI)

1 DEPARTMENT OF NEUROLOGY APPOINTMENTS, PROMOTION AND TENURE DOCUMENT 1/29/13 TABLE OF CONTENTS I. PREAMBLE 3 II. MISSION 4 III. DEFINITIONS A. COMMITTEE OF THE ELIGIBLE FACULTY 4 1. TENURE-TRACK FACULTY 4. APPOINTMENTS 5 A. CRITERIA 6 1. TENURE-TRACK FACULTY 6 2. CLINICAL FACULTY 8 3. RESEARCH FACULTY 9 4

88

APPOINTMENTS, PROMOTION AND TENURE DOCUMENT DEPARTMENT OF PSYCHOLOGY  

E-Print Network (OSTI)

APPOINTMENTS, PROMOTION AND TENURE DOCUMENT DEPARTMENT OF PSYCHOLOGY Revised ­April 7, 2014..........................................................................................5 A. Criteria 1. Tenure-track Faculty 2. Tenure-track Faculty -- Regional Campus 3. Clinical Faculty 4. Research Faculty 5. Associated Faculty 6. Courtesy Appointments B. Procedures 1. Tenure-track

89

Appointment of Contracting Officers and Contracting Officer's Representatives  

Directives, Delegations, and Requirements

To establish procedures governing the selection, appointment, and termination of contracting officers and for the appointment of contracting officer's representatives. To ensure that only trained and qualified procurement and financial assistance professionals, within the scope of this Order, serve as contracting officers. Cancels DOE O 541.1. Canceled by DOE O 541.1B.

2000-10-27T23:59:59.000Z

90

Upgrading Below Grade Spaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patrick H. Huelman, Sam Breidenbach, Steve Schirber Patrick H. Huelman, Sam Breidenbach, Steve Schirber NorthernSTAR Building America Partnership Upgrading Below Grade Spaces Residential Energy Efficiency Stakeholder March 1, 2012 Austin, TX * Act 1: Technical Challenges & Opportunities - Pat Huelman, University of Minnesota * Act 2: Assessing Homeowner Priorities & Risks - Sam Breidenbach, TDS Custom Construction * Act 3: An Industry Perspective - Steve Schirber, Cocoon Act 1. Upgrade Below Grade * Basement Remodeling: It Doesn't Get Any Riskier! - Combustion safety - Foundation moisture - Radon (& other soil gases) - Biologicals (mold, dust mites, etc.) - Garage gases (if attached) * And front and center are uncontrolled... - negative pressures in basements (beyond stack)

91

15 - Biogas upgrading to biomethane  

Science Journals Connector (OSTI)

Abstract: Compared with other utilization paths of biogas, upgrading of biogas to biomethane offers several advantages and has thus become of increased relevance in the last decade. This chapter describes past developments as well as the current state of upgrading, especially in Europe. Specifics of biogas cleaning combined with biogas upgrading will be described. The chapter focuses on technical aspects of upgrading and off-gas treatment methods as well as on economic aspects of biomethane provision.

Michael Beil; Wiebke Beyrich

2013-01-01T23:59:59.000Z

92

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

93

APS User News, Issue 73  

NLE Websites -- All DOE Office Websites (Extended Search)

3, September 15, 2011 3, September 15, 2011 CONTENTS DIRECTOR'S CORNER USER MATTERS -- Tweet Time! APS Beamlines Now Tweet Operational Status Info -- Changes to User Electrical Safety Training Requirements -- Groundbreaking for the New Advanced Protein Crystallization Facility -- Meg Vigliocco-Hagen, APS General User Program Administrator, Retires! -- Meet Beverly Knott, New APS Beam Time Access Administrator -- Safety Snippets: Practice Good Housekeeping BRIEFLY NOTED -- 4th Annual Postdoctoral Research Symposium: Registration Deadline September 21 -- 2011 Advanced Light Source Users' Meeting, October 3-5, 2011 -- 2011 SSRL/LCLS Annual Users' Meeting & Workshops, October 22-26, 2011 -- General Users Proposals Now Being Accepted -- Changes to User Training Course Requirements

94

Biochemical upgrading of oils  

DOE Patents (OSTI)

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

Premuzic, E.T.; Lin, M.S.

1999-01-12T23:59:59.000Z

95

E-Print Network 3.0 - access appointment system Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

are due will not have access to submit grades. A courtesy appointment... To access the "Enter Mass Appointments" ... Source: McQuade, D. Tyler - Department of Chemistry and...

96

BioPartners ApS | Open Energy Information  

Open Energy Info (EERE)

BioPartners ApS BioPartners ApS Jump to: navigation, search Name BioPartners ApS Place Tjele, Denmark Zip 8830 Sector Biomass Product Start-up company offering factual, professional and impartial advice in connection with processes that include biogas production and separation of clean fertilizers directly from degassed digester biomass. Coordinates 56.481861°, 9.62648° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.481861,"lon":9.62648,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

97

APS News | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS News Archives: APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed APS News Kim of ASD Awarded 2014 Wilson Prize for Achievement in Physics of Particle Accelerators Kim of ASD Awarded 2014 Wilson Prize for Achievement in Physics of Particle Accelerators January 7, 2014 Kwang-Je Kim of the Advanced Photon Source has been named the recipient of the 2014 Robert R. Wilson Prize for Achievement in the Physics of Particle Accelerators, Harkay of ASD Elected to Fellowship in the American Physical Society Harkay of ASD Elected to Fellowship in the American Physical Society December 18, 2013 Katherine Harkay of the Accelerator Systems Division has been elected to Fellowship in the American Physical Society for

98

Mikkelsen_APS-07.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

R. Mikkelsen, APS/DPP Mtg., Orlando, 12-16 Nov. 2007 p. 1 R. Mikkelsen, APS/DPP Mtg., Orlando, 12-16 Nov. 2007 p. 1 GYRO Simulations of a Peaked Density H-mode plasma in C-Mod D. R. Mikkelsen, M. Bitter, K. Hill, PPPL M. Greenwald, A. Ince-Cushman, J. Rice, MIT J. Candy, R. Waltz, General Atomics APS/DPP Meeting Orlando, 12-16 November 2007 D. R. Mikkelsen, APS/DPP Mtg., Orlando, 12-16 Nov. 2007 p. 2 What causes H-mode density peaking? a brief history: Angioni, et al., Phys. Plasmas 10 (2003) 3225 GLF23 simulations apparently explain observations. Higher collisionality preferentially reduces anomalous pinch. Angioni, et al., Phys. Plasmas 12 (2005) 112310 GS2 quasilinear estimates of particle flux (supercedes GLF23 work). raising collisionality turns off the pinch, but transition is too early. Estrada-Mila, et al., Phys. Plasmas 13 (2006) 074505

99

APS Pressure Systems Safety Committee  

NLE Websites -- All DOE Office Websites (Extended Search)

adopted by the Lab. The Committee acts at the discretion of its chair; as a committee, an ad-hoc subcommittee, or by the chair alone. 2. Membership The APS PSSC consists of a...

100

APS Today | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS to do in-situ studies of battery materials during their cycling process, in-situ chemical synthetic reactions and also ex-situ studies of quantum-dots, oxides and metal...

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE Appoints Three New Advisory Board Members | Department of...  

Energy Savers (EERE)

members to its advisory board. The agency appointed Noel Berry, Mary Hatcher and Wanda Smith for two-year terms to the Oak Ridge Site Specific Advisory Board (ORSSAB), a federally...

102

POLICY GUIDANCE MEMORANDUM #23 Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes  

Energy.gov (U.S. Department of Energy (DOE))

Policy Guidance Memorandum #23 - DOE Guidance Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes

103

Changes to the Advanced Photon Source storage ring as part of the APS renewal project  

SciTech Connect

The Advanced Photon Source (APS) is a third-generation, storage-ring-based x-ray source that has been operating for more than 13 years and is enjoying a long period of stable, reliable operation. While APS is presently providing state-of-the-art performance to its large user community, we must clearly plan for improvements and upgrades to stay at the forefront scientifically. Significant improvements should be possible through upgrades of beamline optics, detectors, and end-station equipment. In this paper, we discuss the evolutionary changes that are envisioned for the storage ring itself. Among the possibilities are long straight sections, additional straight sections, higher current, short-pulse x-rays, improved insertion devices, and improved beam stability.

Borland, M.; Decker, G.; Dejus, R.; Harkay, K.; Moog, E.; Nassiri, A. [Argonne National Laboratory, Argonne, IL, 60439 (United States)

2010-06-23T23:59:59.000Z

104

Global Scratch Upgrade in Progress  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Scratch Gets Global Scratch Gets an Upgrade Global Scratch Gets an Upgrade Improvements Will Include Higher Data Output Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As a result, some users may see their data output to global scratch reach up to 80 gigabytes per second. Although users will probably not see their 20-terabyte storage quotas increase, the upgrade ensures that global scratch remains flexible and paves the way for PDSF to eventually use the file system Because of the upgrade, users will also be able to better access their temporary data files or "scratch data" from any NERSC system, not just the one that generated it. Prior to the upgrade, Global scratch typically

105

APS Technical Update - No. 11  

NLE Websites -- All DOE Office Websites (Extended Search)

July 30, 1997 July 30, 1997 APS TECHNICAL UPDATE - No. 11 Subject: Experiment Hall Surveying References To facilitate the alignment of beamline components in the Experiment Hall, a number of APS surveying network fiducials have been provided by the APS. This note provides a description of these fiducials for future reference. The fiducials include: a beam center line drawn on the floor for each bending magnet (BM) and insertion device (ID) beamline, four survey monuments per sector, and an array of reference markers along each beamline. The beam centerline drawn on the Experiment Hall floor indicates the nominal position of the center of an undeflected BM or ID beam. This line can be used for the rough alignment of beamline components. For higher precision, four survey monuments have been installed in the

106

Global Scratch Upgrade in Progress  

NLE Websites -- All DOE Office Websites (Extended Search)

the facility is now positioned to meet the performance demands of all its clusters. By upgrading the consolidated Global Scratch, users will be able to continue taking advantage...

107

Upgraded Coal Interest Group  

SciTech Connect

The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

Evan Hughes

2009-01-08T23:59:59.000Z

108

Pacific Direct Current Intertie (PDCI) Upgrade Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Accommodate increased power transmission - The upgrade will allow even more clean power, including hydro, wind and solar, to reach markets that need it. Upgrading and...

109

Upgrading the Vanadium Redox Battery | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Upgrading the Vanadium Redox Battery Upgrading the Vanadium Redox Battery New electrolyte mix increases energy storage by 70 percent After developing a more effective...

110

Secretary of Energy Appoints Hydrogen Technical Advisory Committee |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appoints Hydrogen Technical Advisory Committee Appoints Hydrogen Technical Advisory Committee Secretary of Energy Appoints Hydrogen Technical Advisory Committee June 20, 2006 - 2:28pm Addthis WASHINGTON, DC - Secretary of Energy Samuel W. Bodman today announced the members of the Department of Energy's (DOE) new Hydrogen and Fuel Cell Technical Advisory Committee (HTAC). Formed in accordance with the Energy Policy Act of 2005 (EPACT), HTAC will advise the Secretary on issues related to the development of hydrogen and fuel cell technologies, a key component of President Bush's Advanced Energy Initiative (AEI). Committee members were selected from more than 100 nominees submitted in response to a Federal Register Notice. HTAC will give recommendations to the Secretary regarding DOE's programs, plans, and activities, as well as

111

APS Research Fuels Engineering Interest  

NLE Websites -- All DOE Office Websites (Extended Search)

5th, 2003 5th, 2003 APS Research Fuels Engineering Interest Award-winning research on the characteristics of fuel sprays from injectors is one of the featured articles in the May 2003 issue of Mechanical Engineering and on the Web site of that magazine. The studies, carried out at APS's X-ray Operation and Research beamline 1-BM and the Cornell High Energy Synchrotron Source, revealed startling new information about fuel sprays, including the presence of a shockwave as the spray leaves the injector nozzle. Entitled "Penetrating Vision," the article in Mechanical Engineering, by associate editor John DeGaspari, notes that "an investigative technique using x-rays is causing engine designers to sit up and take notice." In the article, Scott Parrish, General Motors R&D senior research engineer, notes

112

APS USER TRAINING HISTORY Background  

NLE Websites -- All DOE Office Websites (Extended Search)

USER TRAINING HISTORY USER TRAINING HISTORY Background The User Program Division Director has delegated to the CATs the authority to authorize the conduct of experiments because the CATs have accepted responsibility for: * identifying and evaluating the hazards posed by the experiment, * specifying controls appropriate to the hazards, and * verifying that controls are in place. One form of hazard control frequently made mandatory by law and laboratory policy is worker knowledge. The accepted means of verifying that a worker has the required knowledge is ensuring that the worker has completed appropriate training. With CAT input, the APS has developed the APS User Training History. This web-based tool enables designated CAT personnel to examine data characterizing ES&H training courses

113

ANL/APS/TB-17  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 1 Undulator A Characteristics and Specifications: Enhanced Capabilities Roger J. Dejus, Barry Lai, Elizabeth R. Moog, and Efim Gluskin Introduction The undulator A for the Advanced Photon Source (APS) is a planar insertion device that will generate high-intensity x-ray radiation in the spectral range 3.2 keV to 45 keV by using the first, third, and fifth harmonics of radiation. The device has been optimized for the APS so that the variation in brilliance is small when tuning from one harmonic energy to the next. This has been achieved by an increase of the magnetic field for a given gap and by allowing a smaller minimum gap when installed in the storage ring. This document describes the modification of the magnetic structure and the enhanced on- axis magnetic fields. The enhanced spectral performance is discussed and illustrated in tuning

114

aps_news_template.qxd  

NLE Websites -- All DOE Office Websites (Extended Search)

has yet to achieve has yet to achieve the alchemist's dream of turn- ing lead into gold. But a group of researchers using the GeoSoilEnviroCARS (GSE- CARS) and High-Pressure Collaborative Access Team (HP-CAT) facilities at the Depar tment of Energy's Advanced Photon Source (APS) at Argonne National Laboratory, may have found a way to tur n ordinar y soft graphite (source of the "lead" found in pencils) into a new, super-hard material that "looks" just like diamond. Using the high-brilliance x-ray beams from the APS, the group discovered that, under extreme pressure, graphite (among the softest of materials and the source of the lead found in pencils) becomes as hard as diamond, the hardest known material. What's more, the new super-hard material can be induced to return to its previous soft state.

115

APS Visitor Registration Form | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS Visitor Registration Form APS Visitor Registration Form To request access as a visitor who will not do hands-on work, please complete this form. For assistance, contact the APS User Office by phone at (630) 252-9090 or by email at apsuser@aps.anl.gov. Please request access directly by contacting the APS User Office by phone at (630) 252-9090 or by email at apsuser@aps.anl.gov. If you are concerned about sending your passport and visa information, leave those fields blank and fax a letter to (630) 252-9250. To Request APS Visitor Registration, please enter the following: * indicates required field First Name*: Middle Initial/Name*: Last Name*: Title: Organization*: Department: Address 1*: Address 2: City*: State*: Zip Code*: Country: Phone*: Fax: E-mail Address*: Gender*: Female

116

Stephen Southworth Elected to APS Fellowship  

NLE Websites -- All DOE Office Websites (Extended Search)

American Physical Society Honors Decker American Physical Society Honors Decker APS Lights the Way to 2012 Chemistry Nobel APS X-rays Reveal Picasso's Secret DCS and APS Sign MOU The APS and the 2012 Argonne Energy Showcase APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Stephen Southworth Elected to APS Fellowship DECEMBER 19, 2012 Bookmark and Share Stephen Southworth Argonne Senior Scientist Stephen Southworth has been named a Fellow of the American Physical Society, an honor limited to no more than one-half of one percent of the society's membership of more than 50,000. He is recognized for "pioneering the development of atomic and molecular spectroscopies with third- and fourth-generation light sources including

117

APPOINTMENTS, PROMOTION, AND TENURE DOCUMENT College of Mathematical and Physical Sciences  

E-Print Network (OSTI)

APPOINTMENTS, PROMOTION, AND TENURE DOCUMENT College of Mathematical and Physical Sciences March 16............................................................................................................................................................................. 2 2. APPOINTMENT OF TENURE TRACK FACULTY...................................................................................................................... 5 3. REVIEWS AND PROMOTION OF TENURE TRACK FACULTy

118

Policy for Postdoctoral Research (& Teaching) Appointments Effective July 1, 2008  

E-Print Network (OSTI)

Policy for Postdoctoral Research (& Teaching) Appointments Effective July 1, 2008 (Revised July, and the scholar. This policy defines terms and conditions related to postdoctoral research (& teaching are subject to all other applicable UGA and University System of Georgia (USG) policies and procedures

Arnold, Jonathan

119

CURRICULUM VITAE FORMAT TENURE, APPOINTMENT CONTRACT, AND PROMOTION DOSSIERS  

E-Print Network (OSTI)

2005-Present Indiana University School of Medicine HOSPITAL APPOINTMENTS: South County Physicians Administration # BF3430749 1992-Present California License # G075367 1992-1999 Minnesota License # 37974 1995 Medical Informatics Association 2001-Present HONORS AND AWARDS: University of California, San Francisco

Zhou, Yaoqi

120

COLLEGE OF MEDICINE APPOINTMENTS, PROMOTION AND TENURE DOCUMENT  

E-Print Network (OSTI)

. DOCUMENTATION 28 VII. PROMOTION AND TENURE, AND PROMOTION REVIEWS 28 A. CRITERIA 28 1. PROMOTION OF TENURE TRACK1 COLLEGE OF MEDICINE APPOINTMENTS, PROMOTION AND TENURE DOCUMENT APPROVED: 9/19/12 TABLE TENURE TRACK FACULTY 5 2. REGULAR CLINICAL TRACK FACULTY 6 3. REGULAR RESESARCH TRACK FACULTY 6 4

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

FINAL APPROVED VERSION Appointments, Promotion and Tenure Document  

E-Print Network (OSTI)

FINAL APPROVED VERSION Appointments, Promotion and Tenure Document College of Engineering Revised of the Eligible Faculty 4 3.1.1 Regular Tenure Track Faculty 4 3.1.2 Regular Clinical Track Faculty 4 3.1.3 Regular Research Track Faculty 5 3.1.4 Conflict of Interest 5 3.1.5 Minimum Composition 5 3.2 Promotion

122

Upgrade of the MAGIC telescopes  

E-Print Network (OSTI)

The MAGIC telescopes are two Imaging Atmospheric Cherenkov Telescopes (IACTs) located on the Canary island of La Palma. With 17m diameter mirror dishes and ultra-fast electronics, they provide an energy threshold as low as 50 GeV for observations at low zenith angles. The first MAGIC telescope was taken in operation in 2004 whereas the second one joined in 2009. In 2011 we started a major upgrade program to improve and to unify the stereoscopic system of the two similar but at that time different telescopes. Here we report on the upgrade of the readout electronics and digital trigger of the two telescopes, the upgrade of the camera of the MAGIC I telescope as well as the commissioning of the system after this major upgrade.

Mazin, Daniel; Garczarczyk, Markus; Giavitto, Gianluca; Sitarek, Julian

2014-01-01T23:59:59.000Z

123

User and Performance Impacts from Franklin Upgrades  

SciTech Connect

The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

He, Yun (Helen)

2009-05-10T23:59:59.000Z

124

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

2) 2) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2011-3 2012-1 2012-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

125

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

1) 1) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2010-3 2011-1 2011-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

126

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

3) 3) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2012-3 2013-1 2013-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

127

Tank 241-AP-106, Grab samples, 6AP-98-1, 6AP-98-2 and 6AP-98-3 Analytical results for the final report  

SciTech Connect

This document is the final report for tank 241-AP-106 grab samples. Three grab samples 6AP-98-1, 6AP-98-2 and 6AP-98-3 were taken from riser 1 of tank 241-AP-106 on May 28, 1998 and received by the 222-S Laboratory on May 28, 1998. Analyses were performed in accordance with the ''Compatability Grab Sampling and Analysis Plan'' (TSAP) (Sasaki, 1998) and the ''Data Quality Objectives for Tank Farms Waste Compatability Program (DQO). The analytical results are presented in the data summary report. No notification limits were exceeded. The request for sample analysis received for AP-106 indicated that the samples were polychlorinated biphenyl (PCB) suspects. The results of this analysis indicated that no PCBs were present at the Toxic Substance Control Act (TSCA) regulated limit of 50 ppm. The results and raw data for the PCB analysis are included in this document.

FULLER, R.K.

1999-02-23T23:59:59.000Z

128

ELECTROCHEMICAL CORROSION TESTING OF TANKS 241-AN-102 & 241-AP-107 & 241-AP-108 IN SUPPORT OF ULTRASONIC TESTING  

SciTech Connect

This report presents the results of the corrosion rates that were measured using electrochemical methods for tanks 241-AN-102 (AN-102), 241-AP-107 (AP 107), and 241-AP-108 (AP-108) performed under test plant RPP-PLAN-38215. The steel used as materials of construction for AN and AP tank farms was A537 Class 1. Test coupons of A537 Class 1 carbon steel were used for corrosion testing in the AN-107, AP-107, and AP-108 tank waste. Supernate will be tested from AN-102, AP-107, and Ap-108. Saltcake testing was performed on AP-108 only.

WYRWAS RB; DUNCAN JB

2008-11-20T23:59:59.000Z

129

APS Long Range Schedule 2000  

NLE Websites -- All DOE Office Websites (Extended Search)

APS FY2000 Beamline Operations Schedule APS FY2000 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 10 11 12 13 14 15 16 0000-0800 SM SM SM SM SM MS MS 0800 - 1600 SM SM SM SM MS MS MS 1600 - 2400 SM SM SM SM MS MS MS Week 2 17 18 19 20 21 22 23 0000 - 0800 MS MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 3 24 25 26 27 28 29 30 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO JAN/FEB 31 1 2 3 4 5 6 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 5 7 8 9 10 11 12 13 0000 - 0800 UO UO UO UO UO UO UO

130

APS high heat load monochromator  

SciTech Connect

This document contains the design specifications of the APS high heat load (HHL) monochromator and associated accessories as of February 1993. It should be noted that work is continuing on many parts of the monochromator including the mechanical design, crystal cooling designs, etc. Where appropriate, we have tried to add supporting documentation, references to published papers, and calculations from which we based our decisions. The underlying philosophy behind performance specifications of this monochromator was to fabricate a device that would be useful to as many APS users as possible, that is, the design should be as generic as possible. In other words, we believe that this design will be capable of operating on both bending magnet and ID beamlines (with the appropriate changes to the cooling and crystals) with both flat and inclined crystal geometries and with a variety of coolants. It was strongly felt that this monochromator should have good energy scanning capabilities over the classical energy range of about 4 to 20 keywith Si (111) crystals. For this reason, a design incorporating one rotation stage to drive both the first and second crystals was considered most promising. Separate rotary stages for the first and second crystals can sometimes provide more flexibility in their capacities to carry heavy loads (for heavily cooled first crystals or sagittal benders of second crystals), but their tuning capabilities were considered inferior to the single axis approach.

Lee, W.K.; Mills, D.

1993-02-01T23:59:59.000Z

131

http://www.aps.anl.gov/aps/news/20030616.html  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Supports SSRL Sub-Picosecond Particle Source Technology Supports SSRL Sub-Picosecond Particle Source The SPPS multilayer monochromator designed and fabricated at the APS. (Courtesy of Stanford Synchrotron Radiation Laboratory) A new photon source, the Sub-Picosecond Particle Source (SPPS), that promises to image the movement of objects down to the atomic level in subpicosecond time scales will benefit from the contributions of the Advanced Photon Source, the Optics Fabrication and Metrology Group of Argonne's Experimental Facilities Division (XFD), and BioCARS (The University of Chicago). The SPPS is being constructed at the Stanford Synchrotron Radiation Laboratory (SSRL), part of the Stanford Linear Accelerator Center (SLAC) in California. According to the article on the SSRL Web site, the SPPS "will produce and deliver x-rays from bright electron beam pulses. This project provides a fast, relatively inexpensive way to

132

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department...  

Energy Savers (EERE)

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of...

133

upgrade | OpenEI Community  

Open Energy Info (EERE)

4 4 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235354 Varnish cache server upgrade Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 October, 2012 - 07:23 Semantic Mediawiki Semantic Forms update developer Incentives and Policies Semantic Mediawiki upgrade Utility Rates We have just updated Semantic Forms on OpenEI to version 2.4 to enable some upgrades to the utility rate forms (thanks Teresa!). If you see any problems in forms you use on OpenEI, please notify us by commenting on this

134

ANL/APS/TB-2  

NLE Websites -- All DOE Office Websites (Extended Search)

. Use of a Mirror as the First Optical Component for an Undulator Beamline at the APS by W. Yun, A. Khounsary, B. Lai, and E. Gluskin September 1992 . Advanced Photon Source . @ Argonne National Laboratory, Argonne, Illinois 60439 o operated by The University of Chicago for the United States Department of Energy under Contract W-31-1 09-Eng-38 Argonne National Laboratory, with facilities in the states of Ilinois and Idaho, is owned by the United States government, and operated by The University of Chicago under the provisions of a contract with the Deparment of Energy. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any waranty, express

135

APS User News, Issue 70  

NLE Websites -- All DOE Office Websites (Extended Search)

70, July 7, 2011 70, July 7, 2011 CONTENTS 1. DIRECTOR'S CORNER USER MATTERS 2. More User Mysteries Solved! 3. Several APS Users Recognized in Inaugural Class of New American Crystallographic Association Fellows Program 4. Congratulations to Keith Moffat, Winner of the ACA 2011 Patterson Award 5. Paul Fenter Wins Warren Award for X-ray Diffraction Studies 6. Energy, Enthusiasm, Cooperation, and Commitment Characterize NUFO Annual Meeting BRIEFLY NOTED -- Heads Up: User Participation in Upcoming Reviews -- Upcoming General User Proposal Deadlines -- Reminder: Registration for 2011 X-ray Science Gordon Research Conference & Seminar Closes July 9, 2011 -- Shanghai Institute of Applied Physics Workshop on Science with Free-Electron Lasers on August 20-21, 2011 =====================================================

136

aps_news_template.qxd  

NLE Websites -- All DOE Office Websites (Extended Search)

High Pressure Collaborative Access Team (HP-CAT) High Pressure Collaborative Access Team (HP-CAT) at APS sector 16 will be a primary location for research carried our under a new grant from the National Nuclear Security Administration (NNSA). The $5.9-million, 2.75-year NNSA grant to the Geophysical Laboratory of the Carnegie Institution in Washington, D.C., under the Stewardship Science Academic Alliances program, will fund research into the behavior of materials under extreme pressure conditions at the Carnegie/Department of Energy Alliance Center (CDAC). The NNSA selected CDAC because of the leadership of its team in the development of new techniques and capabilities in high-pressure and high-temperature materials research. As principal investigator for the grant, Dr. Russell Hemley of Carnegie, explains: "There is a critical need to perform exper-

137

aps_safey_notice.qxp  

NLE Websites -- All DOE Office Websites (Extended Search)

effects from lead exposure are a concern both at the workplace and in the home. An adult's expo- effects from lead exposure are a concern both at the workplace and in the home. An adult's expo- sure to lead is usually from occupational sources. Children are exposed (primarily at home) from surface dust, floors, and chewable surfaces contaminated with lead. Lead has no beneficial effect on humans. Between 5% and 10% of ingested lead passes from the intestinal tract into the bloodstream, which distrib- utes the lead to red blood cells, soft tissues, and bone. Lead in the body is eliminated very slowly, mainly by the kidneys and digestive tract. ANL follows the guidelines set by the Occupational Safety and Health Administration regulations in order to minimize the occupational (workplace) exposure to lead. The main source of lead at the APS is from bulk shielding materials in the form of lead bricks, lead shot,

138

APS News 2012 | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Stephen Southworth Elected to APS Fellowship Stephen Southworth Elected to APS Fellowship Stephen Southworth Elected to APS Fellowship December 19, 2012 Argonne Senior Scientist Stephen Southworth has been named a Fellow of the American Physical Society for "pioneering the development of atomic and molecular spectroscopies with third- and fourth-generation light sources..." American Physical Society Honors Decker American Physical Society Honors Decker November 19, 2012 Senior Scientist Glenn Decker has been named a fellow of the American Physical Society, an honor limited to no more than one-half of one percent of the society's membership of more than 50,000. APS X-rays Reveal Picasso's Secret APS X-rays Reveal Picasso's Secret October 15, 2012 The Illinois Institute of Technology, in conjunction with

139

2009 Chemistry Nobel to APS Users  

NLE Websites -- All DOE Office Websites (Extended Search)

The First Experiment at the LCLS The First Experiment at the LCLS Linda Young Named to Head X-ray Science Division $7.9 M in ARRA Funding Brings New Instrumentation to the APS Hard X-ray Nanoprobe Earns an R&D 100 Award Winans of XSD Elected to ACS Fellowship APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed 2009 Chemistry Nobel to APS Users OCTOBER 7, 2009 Bookmark and Share Clockwise from top left: Ada Yonath, Venkatraman Ramakrishnan, and Thomas Steitz. All three recipients of the 2009 Nobel Prize in Chemistry published papers on their award-winning work based on data collected at the U.S. Department of Energy's (DOE) Advanced Photon Source (APS) at Argonne National Laboratory. Between them, biochemists Thomas Steitz of Yale University, Ada Yonath of

140

CATEGORICAL EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, 300 AREA, HANFORD SITE, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to upgrade a landscaping irrigation system in the 300 Area. Location of Action: In the landscaped area around the 331 Building, Hanford Site Description of the Proposed Action: The proposed action is to upgrade the existing 331 Building landscaping irrigation system by using nearby aquaculture effluent instead of

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

LHC challenges and upgrade options  

Science Journals Connector (OSTI)

The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex.

O Bruning

2008-01-01T23:59:59.000Z

142

ATLAS Upgrade for sLHC Motivation  

E-Print Network (OSTI)

ATLAS Upgrade for sLHC · Motivation · LHC Upgrades · ATLAS Upgrade/schedule · R&D Variety · Russian Institutes involvement · Conclusions A.Cheplakov JINR, Dubna (on behalf of the ATLAS Collaboration) Many thanks to ATLAS colleagues for the useful information - N.Hessey, A.Loginov, A.Romaniouk, P

143

ATLAS Upgrade Week 1 November 11, 2009  

E-Print Network (OSTI)

ATLAS Upgrade Week 1 November 11, 2009 Proposal to Develop On-Detector Array-based Optical Link A. Maettig Universität Wuppertal K.K. Gan A. Pellegrino, T. Sluijk NIKHEF (LHCb) #12;ATLAS Upgrade Week 2;ATLAS Upgrade Week 3 Introduction VCSEL and PIN are available in three forms: single channel or 4

Gan, K. K.

144

A Record Run for the APS X-ray Source  

NLE Websites -- All DOE Office Websites (Extended Search)

2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed A Record Run for the APS X-ray Source FEBRUARY 23, 2012 Bookmark and Share The APS storage ring. X-ray beams and...

145

Tank 241-AP-107, grab samples, 7AP-99-1, 7AP-99-3 and 7AP-99-4 analytical results for the final report  

SciTech Connect

This document is the format IV, final report for the tank 241-AP-107 (AP-107) grab samples taken in May 1999 to address waste compatibility concerns. Chemical, radiochemical, and physical analyses on the tank AP-107 samples were performed as directed in Compatibility Grab Sampling and Analysis Plan for Fiscal year 1999. Any deviations from the instructions provided in the tank sampling and analysis plan (TSAP) were discussed in this narrative. Interim data were provided earlier to River Protection Project (RPP) personnel, however, the data presented here represent the official results. No notification limits were exceeded.

BELL, K.E.

1999-08-12T23:59:59.000Z

146

John. F. O'Leary Appointed to Lead Federal Energy Administration...  

National Nuclear Security Administration (NNSA)

John. F. O'Leary Appointed to Lead Federal Energy Administration | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

147

APS Director Stephenson Named Argonne Distinguished Fellow  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Technology and Research Rose of APS and CNM One of Four DOE Early Career Award Winners Scientists Close-In on Artificial Spider Silk Ekiert Earns 2012 APSUO Franklin Award for Studies of Influenza Virus Clever Apes on WBEZ: Breaking the Fossil Record APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed APS Director Stephenson Named Argonne Distinguished Fellow JULY 19, 2012 Bookmark and Share Brian Stephenson Brian Stephenson has been named one of five Argonne National Laboratory Distinguished Fellows for 2012. Stephenson is the Argonne Associate Laboratory Director for Photon Sciences and Director of the U.S. Department

148

About: Why Energy Efficiency Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

Why Energy Efficiency Upgrades Why Energy Efficiency Upgrades Two photos side by side showing energy loss through the use of infrared technology. As part of a home energy evaluation, an energy professional can use an infrared camera to pinpoint where air leaks and drafts are occurring in your home or building. Although normally difficult to see, these infrared photos clearly show in color where energy losses are occurring in a typical house. How We Use Energy in Our Buildings How We Use Energy in Our Homes (% of Energy Consumption) A pie chart illustrating the following breakdown: Space heating 43%, space cooling 9.7%, water heating 17.1%, lighting 6.2%, refrigeration 3.9%, electronics 3%, wet cleaning 3.2%, cooking 3.1%, computers 1.6%. Source: 2010 Buildings Energy Data Book, Table 2.1.6

149

Improved temperature regulation of process water systems for the APS storage ring.  

SciTech Connect

Beam stability and operational reliability of critical mechanical systems are key performance issues for synchrotron accelerators such as the Advanced Photon Source (APS). Stability is influenced by temperature fluctuations of the process water (PW) used for cooling and/or temperature conditioning storage ring (SR) components such as vacuum chambers, magnets, absorbers, etc. Operational reliability is crucial in maintaining facility beam operations and remaining within downtime ''budgets.'' Water systems for the APS storage ring were originally provided with a distributive control system (DCS) capable of regulation to {+-}1.0 F, as specified by facility design requirements. After several years of operation, a particular mode of component mortality indicated a need for upgrade of the temperature control system. The upgrade that was implemented was chosen for both improved component reliability and temperature stability (now on the order of {+-}0.2 F for copper components and {+-}0.05 F for aluminum components). The design employs a network of programmable logic controllers (PLCs) for temperature control that functions under supervision of the existing DCS. The human-machine interface (HMI) of the PLC system employs RSView32 software. The PLC system also interfaces with the EPICS accelerator control system to provide monitoring of temperature control parameters. Eventual supervision of the PLC system by EPICS is possible with this design.

Putnam, C.; Dortwegt, R.

2002-10-10T23:59:59.000Z

150

D0 Silicon Upgrade: Upgrade on Cryogenic Lines at Refrigerator  

SciTech Connect

This is an upgrade to the thermal contraction analysis sound in D0 Engineering Note: 3823.115-EN-426. In this new design, a portion of the transfer lines are consolidated into one 6-inch vacuum jacket. Since all four transfer lines follow the same path and are of equal lengths, the stress analysis is performed on only one transfer line using the design system ALGOR{reg_sign}. The GHe Cooldown Supply line is analyzed for combined pressure, thermal movement, and dead weight and all the stresses were below the allowable stress limit of 25,050 psi.

Kuwazaki, Andrew; /Fermilab

1995-09-26T23:59:59.000Z

151

Energy Upgrade California | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrade California Upgrade California Energy Upgrade California < Back Eligibility Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Sealing Your Home Ventilation Manufacturing Heating Windows, Doors, & Skylights Program Info Funding Source The American Reinvestment and Recovery Act of 2009, ratepayer funds State California Program Type State Rebate Program Rebate Amount Basic Upgrade Package: 1,000 Advance Upgrade Package: 1,500 - 4,000 The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified contractors, and helps homeowners find all the available incentives from their local

152

To make an appointment with a Peer Advisor, visit the SURF  

E-Print Network (OSTI)

To make an appointment with a Peer Advisor, visit the SURF website at http://our.unc.edu/ students/funding-opportunities/ fellowships/surf/ and scroll down to find the link to the SURF Peer Advisor Request Form. While you're there for Undergraduate Research. peeradvising EUISMOD ELEMENTUM SURF Peer Advisors are available by appointment to assist

Sekelsky, Jeff

153

EXCERPT FROM THE 2012-2014 AGREEMENT ON CONDITIONS OF APPOINTMENT FOR FACULTY  

E-Print Network (OSTI)

and significance, or, in appropriate fields, distinguished, creative or professional work of a scholarly nature standards of excellence and have wide recognition in the field of their interest. They must have shown high appointment with review shall be denied reappointment or a tenured appointment on the ground

Pulfrey, David L.

154

DEPARTMENT OF PHYSICAL MEDICINE AND REHABILITATION APPOINTMENTS, PROMOTION AND TENURE DOCUMENT  

E-Print Network (OSTI)

1 DEPARTMENT OF PHYSICAL MEDICINE AND REHABILITATION APPOINTMENTS, PROMOTION AND TENURE DOCUMENT OF THE ELIGIBLE FACULTY 5 1. TENURE-TRACK FACULTY 5 2. CLINICAL FACULTY 6 3. RESEARCH FACULTY 6 4. ASSOCIATED, PROMOTION AND TENURE, PROMOTION, RENEWAL 8 IV. APPOINTMENTS 8 A. CRITERIA 8 1. TENURE-TRACK FACULTY 8 2

155

DEPARTMENT OF PSYCHIATRY AND BEHAVIORAL HEALTH APPOINTMENTS, PROMOTION AND TENURE DOCUMENT  

E-Print Network (OSTI)

1 DEPARTMENT OF PSYCHIATRY AND BEHAVIORAL HEALTH APPOINTMENTS, PROMOTION AND TENURE DOCUMENT OF THE ELIGIBLE FACULTY 5 1. TENURE-TRACK FACULTY 5 2. CLINICAL FACULTY 6 3. RESESARCH FACULTY 6 4. ASSOCIATED, PROMOTION AND TENURE, PROMOTION, RENEWAL 9 IV. APPOINTMENTS 9 A. CRITERIA 9 1. TENURE-TRACK FACULTY 9 2

156

California Member Connects Solar Adoption With Upgrades  

Energy.gov (U.S. Department of Energy (DOE))

Studies on the connection between solar adoption and energy upgrades by Better Buildings Residential Network member Center for Sustainable Energy (CSE) in California are helping solar companies...

157

BIOREFINING COMPOUNDS AND ORGANOCATALYTIC UPGRADING METHODS ...  

NLE Websites -- All DOE Office Websites (Extended Search)

invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate...

158

Upgrade Boilers with Energy-Efficient Burners  

SciTech Connect

This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

159

Metal Organic Framework Adsorbent for Biogas Upgrading  

Science Journals Connector (OSTI)

In this context, this adsorbent can be used for biogas upgrading to produce biomethane and reduce fossil-fuel CO2. ...

Simone Cavenati; Carlos A. Grande; Alrio E. Rodrigues; Christoph Kiener; Ulrich Mller

2008-07-25T23:59:59.000Z

160

APS News 2008 | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

From: Nature Research Highlights From: Nature Research Highlights From: Nature Research Highlights DECEMBER 1, 2008 APS Renewal White Paper APS Renewal White Paper November 21, 2008 The white paper prepared for the Department of Energy, Office of Science, Office of Basic Energy Sciences by the management and users of the Advanced Photon Source to set the foundation for renewal of this vital national research facility is now available in PDF format. Winner of AAAS Science Education Prize Visits Argonne Winner of AAAS Science Education Prize Visits Argonne October 23, 2008 Diane Riendeau, winner of the 2008 American Association for the Advancement of Science Leadership in Science Education Prize for High School Teachers, paid a visit to Argonne National Laboratory. SESAME and the APS: Opening Doors Helps the Light Shine In

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

APS Bending Magnet X-rays and  

NLE Websites -- All DOE Office Websites (Extended Search)

Irradiation of Nd-Fe-B Permanent Magnets with Irradiation of Nd-Fe-B Permanent Magnets with APS Bending Magnet X-rays and 60 Co γ-rays J. Alderman and P.K. Job APS Operations Division Advanced Photon Source J. Puhl Ionizing Radiation Division National Institute of Standards and Technology June 2000 Table of Contents Introduction Radiation-Induced Demagnetization of Permanent Magnets Resources Required γ-ray Irradiation Results and Analysis of γ-ray Irradiation X-ray Irradiation Results and Analysis of X-ray Irradiation Summary and Conclusions Acknowledgements References Tables and Figures Introduction The Advanced Photon Source (APS), as well as other third-generation synchrotron light sources, uses permanent magnets in the insertion devices to produce x-rays for scientific

162

Novel Insertion Devices at the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

Agenda Insertion Device Workshop Thursday 5 Dec. 2002. Bldg. 402 E1100/1200 Click on link to see presentation slides. 8:50 .... Welcome J. Murray Gibson 9:00 .... Current APS Insertion Devices Roger Dejus 9:35 .... New Possibilities for IDs at the APS Shigemi Sasaki 10:10 .... Superconductiong Undulator Possibilities Bob Kustom . 10:30 .... Break . . 10:55 Superconductive cryogen-free in-vacuo undulators for storage rings Robert Rossmanith 11:10 .... A novel type of undulator Gopal Shenoy 11:30 .... APS storage ring considerations Nick Sereno/Glenn Decker . 12:00 .... Lunch . .... . Insertion Devices at other Sources 1:30 .... IDs elsewere I: ESRF Joel Chavanne 2:15 .... IDs elsewhere II: ELETTRA Bruno Diviacco . 3:00 .... Break . . .... . User Requirements and Desires 3:30 .... E. E. Alp (Inelastic X-ray scattering)

163

Radioactive Samples / Materials at the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

Using Radioactive Samples / Materials at the APS Using Radioactive Samples / Materials at the APS The use of radioactive samples requires additional information for review and approval. All proposed experiments involving radioactive samples will be reviewed by the APS Radioactive Sample Safety Review Committee (RSSRC). The review will be on a graded basis. Hence, the experimenters are strongly advised to send in the experiment proposal in detail at least 2 months before the expected scheduled date of the experiment. Previously approved containment, isotopes and weights can be submitted as late as 2 weeks in advance. If your ESAF was submitted less than seven (7) days in advance of its scheduled start date you may be delayed to allow time for a safety review. The following guidelines are to be followed for all experiments with

164

UC/APS Mini-Symposium  

NLE Websites -- All DOE Office Websites (Extended Search)

UC/APS Mini-Symposium UC/APS Mini-Symposium Host: Ali Khounsary December 10, 2003 Room A1100 APS, Argonne National Laboratory UC Program for Research in Cell Injury and Repair Alteration of cellular proteins or organelles due to reactive chemicals or high-energy physical stresses represents the most common mechanism of tissue injury leading to tissue necrosis. Diseases such as myocardial infarction, cerebrovascular stroke, cerebral palsy, burns, electrical shock, and acute radiation poisoning are examples. The success of modern gene therapy also depends on repair of the cell membrane after insertion of new genetic material. When normal cellular repair functions are incapable of managing the cell injury, pharmaceutical intervention can be lifesaving. The mission of the Center for Molecular Repair is to investigate strategies

165

APS User News-at-a-Glance, Issue 1  

NLE Websites -- All DOE Office Websites (Extended Search)

Electronic Bulletin Established for APS Users Electronic Bulletin Established for APS Users Web-based Independent Investigator Proposal Submission Goes "Live" Call for APS User Publications Reminder: APS Access Requirements for Non-U.S. Citizens APS Program Evaluation Board Meeting, October 11-13, 2000 Highlights of the Next User Run APS User News-at-a-Glance Issue 1; September 20, 2000 1. Electronic Bulletin Established for APS Users This issue of APS User News-at-a-Glance is the first of periodic electronic news bulletins for APS users. If you've received this issue by direct e-mail, you are already subscribed and need to do nothing further to receive future bulletins. If you prefer not to receive these messages, you can unsubscribe by replying to this e-mail and placing the word "unsubscribe" in the subject line of your e-mail reply.

166

Work Authorization Document NSTX Upgrade Project  

E-Print Network (OSTI)

Work Authorization Document NSTX Upgrade Project Control Account #: 1302 Title: WBS 1.1.11 Title Functional Manager P. Heitzenroeder Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS and includes design modifications and upgrade of the coil assembly stand; procedures for assembling the Center

Princeton Plasma Physics Laboratory

167

ATLAS Upgrade Week 1 November 10, 2010  

E-Print Network (OSTI)

VCSEL/PIN Irradiation Study radiation hardness of VCSEL/PIN arrays since 2006: vendors: AOC arrays (2010): see next slides AOC 10 Gb/s VCSEL (2010): see next slides #12;K.K. Gan ATLAS Upgrade/cm2: 76% consistent with NIEL hypothesis #12;K.K. Gan ATLAS Upgrade Week 9 Irradiation of AOC

Gan, K. K.

168

NSTXpool Computer Upgrade December 9, 2010  

E-Print Network (OSTI)

NSTXpool Computer Upgrade WP #1685 Bill Davis December 9, 2010 #12;Work Scope Upgrade Operating System, Application Software, and Programs that run on NSTX computers using Red Hat Enterprise Linux 3. nstxpool computers + nstxops nstxWindowsPC (Control Room Display Wall) Big Blue cluster for EFIT Selected

Princeton Plasma Physics Laboratory

169

The Bottom Line Space@Penn Upgrade  

E-Print Network (OSTI)

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

170

LHC set to halt for upgrades  

Science Journals Connector (OSTI)

... particle collider is ready to take a well-earned rest. The Large Hadron Collider (LHC) will shut down on 11February ahead of around two years of upgrade work. ... there will be no long holiday for the thousands of physicists who depend on the LHC for their data. A bruising schedule of maintenance, upgrades and forward planning will keep ...

Geoff Brumfiel

2013-02-06T23:59:59.000Z

171

MMCR Upgrades: Present Status and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

172

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

173

Future Upgrades | Brookhaven and the LHC  

NLE Websites -- All DOE Office Websites (Extended Search)

Future Upgrades Future Upgrades Magnetic field inside a Nb3Sn quadropole magnet Magnetic field inside a Nb3Sn quadropole magnet. Brookhaven leads various technical coordination efforts for the upgrade of the ATLAS detector, including constructing the new silicon tracker, liquid argon electronics, and the new muon chambers. Brookhaven also contributes to the commissioning and future upgrade of the LHC itself in two areas: accelerator physics and superconducting magnets. This work is carried out as part of the U.S. LHC Accelerator Research Program (LARP) in collaboration with Fermilab, Lawrence Berkeley National Lab, and the Stanford Linear Accelerator Center. The ultimate goal of the upgrade program is to increase the rate and efficiency of particle collisions, a measure known as luminosity.

174

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

175

Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

About About Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades to someone by E-mail Share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Facebook Tweet about Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Twitter Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Google Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Delicious Rank Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Digg Find More places to share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on AddThis.com... Our History Related Federal Programs Why Energy Efficiency Upgrades

176

EECBG Success Story: Energy Efficiency Upgrades Part of Winning...  

Energy Savers (EERE)

EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for...

177

Federal Finance Facilities Available for Energy Efficiency Upgrades...  

Energy Savers (EERE)

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

178

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks. Algal Lipid Extraction and Upgrading to Hydrocarbons...

179

Weatherization and Workforce Guidelines for Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Home Energy Upgrades Fact Sheet Weatherization and Workforce Guidelines for Home Energy Upgrades Fact Sheet This fact sheet provides essential information about the 2011...

180

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Single-Family Home Energy Upgrades to define the minimum requirements for high- quality residential energy upgrades. The Standard Work Specifications for Single-Family...

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a...

182

refractory_retain_whyte_APS07.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

APS-DPP Whyte Nov. 07 APS-DPP Whyte Nov. 07 Hydrogenic Fuel Retention in Refractory Metals D.G. Whyte 1 , B. Lipschultz 1 , J. Irby 1 , G. Wright 2 1 Plasma Science & Fusion Center, MIT, Cambridge USA 2 FOM-Rijnhuizen, Netherlands APS Division of Plasma Physics Meeting Mini-Conference: First Micron of the Wall November 2007, Orlando, Florida APS-DPP Whyte Nov. 07 Why are refractory metals (Mo, W) favored to minimize retained hydrogenic fuel in plasma-facing materials? * Carbon:  Non-permeable  Plasma-deposited surface layers accumulate T/C ~ 1. * Refractory metals  Highly permeable to H  Permeation sensitive to T.  Very low intrinsic solubility. * Inventory in cm thick Mo/W?  C-Mod: 10 m 2 → 10 21 D.  ITER: 10 3 m 2 → 0.2 g T 1 mm 3 nm ( D Δt ) 1/2 ~10 -7 ~1 c 0 (H/atom) ~10 -10 ~10 -21 D

183

ATLAS Nightly Build System Upgrade  

E-Print Network (OSTI)

The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

2013-01-01T23:59:59.000Z

184

Progress on an energy recovery linac upgrade to the Advanced Photon Source  

SciTech Connect

The Advanced Photon Source (APS) is a third-generation storage-ring-based x-ray source that has been operating for more than 13 years and is enjoying a long period of stable, reliable operation. However, major accelerator upgrades are being investigated in order to maintain scientific relevance into the future. One very promising possibility is the use of an energy recovery linac (ERL). In this option, APS would transition from a source based on a stored electron beam to one based on a continuously generated high-brightness electron beam from a linac. Such a source promises dramatically improved brightness and transverse coherence compared to third-generation storage rings. We present a new design for an ERL upgrade that incorporates very long insertion devices. We show that operation at high electron beam energy provides the promise of extremely high brightness for hard x-rays. We also show results of the first start-to-end simulations of an ERL-based x-ray source.

Borland, Michael; Dong Xiaowei; Li Yuelin [Argonne National Laboratory, Argonne, IL, 60439 (United States)

2010-06-23T23:59:59.000Z

185

Instructions on Entering Publications into the APS Database  

NLE Websites -- All DOE Office Websites (Extended Search)

Methods to enter user publications into the APS publication database Methods to enter user publications into the APS publication database The APS Publications Database is a searchable compendium of information on results from research at the APS, and the official source for listings of APS-related publications. It is the source for reports to APS review and advisory committees (including the APS Scientific Advisory Committee); the U.S. Department of Energy; and other government agencies. Maintaining complete and up-to-date records is of great importance to the facility and its users. Please note that the database is also the repository for dissertations, abstracts, awards, and invited talks. In this way, we hope to build a comprehensive record of information about research at the APS. We appreciate your help in keeping this important database current, and

186

APS User News-at-a-Glance, Issue 5  

NLE Websites -- All DOE Office Websites (Extended Search)

5; March 1, 2001 5; March 1, 2001 Contents: 1. APS Deputy Director John Galayda Accepts Top LCLS Post Applications Being Taken for Third Neutron and X-ray Summer School APS User Re-training Begins Weekly User Science Seminars Begin March 23 Wanted: APS User Activity Report 2000 Submissions 1. APS Deputy Director John Galayda Accepts Top LCLS Post (Contact: rt@aps.anl.gov) In a February 23, 2001, memo to APS staff, David Moncton announced with "great regret, but also with great expectations" that he had accepted John Galayda's resignation from the APS to take a position as director of the Linac Coherent Light Source (LCLS) project at the Stanford Linear Accelerator Center. Moncton wrote that "John has made an extraordinary contribution to the APS and to Argonne National

187

Published Reports of Work Carried Out at the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

APS or Argonne in preparing press releases, please do not hesitate to contact Richard Fenner (fenner@aps.anl.gov, 630-252-5280). Please also notify Richard Fenner when you are...

188

Bioener ApS formerly FLS milj a s | Open Energy Information  

Open Energy Info (EERE)

Bioener ApS formerly FLS milj a s Bioener ApS formerly FLS milj a s Jump to: navigation, search Name Bioener ApS (formerly FLS miljø a/s) Place Copenhagen, Denmark Zip 2500 Product Industrial boiler manufacturer and EPC (Engineering, Procurement and Construction) contractor focussing on straw-firing. Coordinates 55.67631°, 12.569355° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.67631,"lon":12.569355,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

189

DOE Appoints Stephen Eule As Director of the Climate Change Technology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appoints Stephen Eule As Director of the Climate Change Appoints Stephen Eule As Director of the Climate Change Technology Program DOE Appoints Stephen Eule As Director of the Climate Change Technology Program March 31, 2006 - 9:51am Addthis WASHINGTON , D.C. - Secretary of Energy Samuel W. Bodman today announced the appointment of Stephen D. Eule as the Director of the Climate Change Technology Program (CCTP) in the Office of Policy and International Affairs. "With his depth of experience in science, environmental and energy policy issues, Steve will provide invaluable counsel to the Department and this Administration as we work to bring the latest in climate change technology to the forefront," Secretary Bodman said. As director of the CCTP, Mr. Eule will coordinate the federal government's technology research and development (R&D) activities. Through a

190

Robert C. Seamans, Jr. Appointed to Lead Nuclear Weapons Program | National  

NLE Websites -- All DOE Office Websites (Extended Search)

C. Seamans, Jr. Appointed to Lead Nuclear Weapons Program | National C. Seamans, Jr. Appointed to Lead Nuclear Weapons Program | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Robert C. Seamans, Jr. Appointed to Lead ... Robert C. Seamans, Jr. Appointed to Lead Nuclear Weapons Program January 19, 1975

191

12th Users Meeting for the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

April 29 - May 1, 2003 Argonne National Laboratory Argonne, Illinois DATES TO REMEMBER April 1 Abstract deadline Registration deadline for non-U.S. citizens April 7 Housing deadline April 15 Registration deadline ..... Adjunct Meetings APSUO Steering Committee Elections Banquet Call for Poster Abstracts Compton Award Comprehensive Program Exhibitors/Sponsors General Information Schedule-at-a-Glance Travel and Housing Arrangements Workshop Descriptions ... APS Users Organization Steering Committee Paul Zschack, Chairman Stephen Durbin, Vice-Chairman John Budai Lin Chen David Cookson Pulak Dutta Dean Haeffner Lisa Keefe Steven Muchmore John Rose Amy Rosenzweig Sunil Sinha Brian Stephenson Susan Strasser, APS Liaison Eric Isaacs, ex officio ... Twelfth Users Meeting Committee Stephen Durbin--Scientific Program and Workshops Chair

192

Photoneutron production inside the APS Storage Ring  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 Neutron Fluence Estimates Inside the APS Storage Ring During Normal Operation P.K. Job and J. Alderman Advanced Photon Source Argonne National Laboratory April 2002 Neutron Fluence Estimates Inside the APS Storage Ring During Normal Operation P.K. Job and J. Alderman Advanced Photon Source Argonne National Laboratory April 2002 Introduction In an electron storage ring, neutrons are generated as a result of the electron beam interaction with high-Z materials, such as scrapers and collimators [1]. When the energy of the incident electron beam is sufficiently high, it can produce high-energy photons, which subsequently interact with a nucleus, resulting in the emission of nucleons. This interaction is known as a photonuclear interaction. For photons with energies above the

193

APS Beamline Questionnaire Form | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS Beamline Motor Drive Questionnaire Form APS Beamline Motor Drive Questionnaire Form * indicates required field Please send a separate email to Thomas Barkalow with an attached beamline drawing or sketch showing where the groups are located and the distances they are apart. First Name*: Middle Initial/Name: Last Name*: Beamline Designation*: What is the total number of driver units with makes and models?: How are driver units grouped together and each group's location within the beamline?: What number of driver units are in use simultaneously for each group?: What is the maximum amperage setting actually used for each unit?: What is the number of groups in use simultaneously and which groups are they?: Verification: We need to make sure you are a human. Please solve the challenge below, and click the I'm a Human button to get a confirmation code. To make this

194

12 GeV Upgrade | Jefferson Lab  

NLE Websites -- All DOE Office Websites

Science Science A Schematic of the 12 GeV Upgrade The 12 GeV Upgrade will greatly expand the research capabilities of Jefferson Lab, adding a fourth experimental hall, upgrading existing halls and doubling the power of the lab's accelerator. A D D I T I O N A L L I N K S: 12 GeV Home Public Interest Scientific Opportunities Hall D Status Updates Contacts Three-Year Accelerator Schedule 2014 - 2016 top-right bottom-left-corner bottom-right-corner 12 GeV Upgrade Physicists at Jefferson Lab are trying to find answers to some of nature's most perplexing questions about the universe by exploring the nucleus of the atom. Their goal is to answer such questions as: "What is the universe made of?" and "What holds everyday matter together?" In their search for answers, physicists smash electrons into atoms using

195

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES  

Energy.gov (U.S. Department of Energy (DOE))

Designed to promote energy efficiency in buildings in Phoenix, Arizonas 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

196

EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES  

Energy.gov (U.S. Department of Energy (DOE))

In Santa Barbara County, California, the weather is so temperate that even the least energy-efficient homes can still feel comfortable year-round. To help residents see that energy upgrades can...

197

MAST Upgrade Advancing compact fusion sources  

E-Print Network (OSTI)

as a stepping stone to greater involvement in the fusion sector and, in particular, the commercial opportunities to fusion research. MAST Upgrade will build on this progress, providing a truly world-class device capable

198

RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE  

SciTech Connect

Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

Paul Tran; 293 Highway 740; Baden, NC 28009

2013-02-28T23:59:59.000Z

199

The upgraded scheme of Hefei Light Source  

SciTech Connect

To enhance the performance of Hefei Light Source, which was designed and constructed two decades ago, an upgrade project would be carried out in the near future. The detail upgrade scheme was described in this paper. Firstly, the magnet lattice of storage ring should be reconstructed with 4 DBA cells, whose advantages are lower beam emittance and more straight section available for insertion devices. Secondly, the beam diagnostics, main power supply, transverse and longitudinal multi-bunch feedback, beam control and manipulation system would be upgrade to improve the beam orbit stability. Finally, the injection system of storage ring and injector, which is composed of electron linac and beam transfer line, would be updated in order to assure smooth beam accumulation process under new low emittance lattice. With above improvement, it is hopeful to increase the brilliance of Hefei Light Source by two orders approximately. After three-year upgrade project, the performance of HLS would meet the demands of advanced SR users.

Li Weimin; Xu Hongliang; Wang Lin; Feng Guangyao; Zhang Shancai; Hao Hao [National Synchrotron Radiation Laboratory of University of Science and Technology of China, Anhui (China)

2010-06-23T23:59:59.000Z

200

APS - Solutions for Business Financing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APS - Solutions for Business Financing APS - Solutions for Business Financing APS - Solutions for Business Financing < Back Eligibility Commercial Industrial Institutional Retail Supplier Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Appliances & Electronics Commercial Lighting Lighting Manufacturing Program Info Funding Source APS State Arizona Program Type Utility Loan Program Rebate Amount Varies (project costs, less rebate amount) APS and National Bank of Arizona have partnered to offer low-interest financing to all customers qualifying for energy efficiency incentives under the Solutions for Business program. Combined with program rebates, financing can help cover the up-front costs of energy-saving improvements,

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Utilization of STEP AP 210 at The Boeing Company  

Science Journals Connector (OSTI)

Boeing has been working on the development and implementation of STEP AP 210 since its inception. Using a combination of internally funded activities, external government contracts and multi-company pilots, Boeing has developed prototype tools to utilize AP 210 and is poised to move these tools into production. This paper begins with a brief overview of STEP and AP 210. The status of available AP 210 vendor translators (data generators), along with viewers and analysis programs (data consumers) is covered. Discussion continues with present and planned usage of AP 210 in several companies with the primary emphasis on implementation at The Boeing Company. The document concludes with a summary of key points.

Gregory L. Smith

2002-01-01T23:59:59.000Z

202

Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in  

NLE Websites -- All DOE Office Websites (Extended Search)

Honeymoons Honeymoons Lead to Upgrades in Western Vermont to someone by E-mail Share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Facebook Tweet about Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Twitter Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Google Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Delicious Rank Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Digg Find More places to share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on AddThis.com... Better Buildings Residential Network Progress

203

High Flux Isotope Reactor power upgrade status  

SciTech Connect

A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions.

Rothrock, R.B.; Hale, R.E. [Oak Ridge National Lab., TN (United States); Cheverton, R.D. [Delta-21 Resources Inc., Oak Ridge, TN (United States)

1997-03-01T23:59:59.000Z

204

APS User News-at-a-Glance, Issue 15  

NLE Websites -- All DOE Office Websites (Extended Search)

5; June 14, 2002 5; June 14, 2002 Contents: 1. First APS/User Retreat: A Success! Dates Set for the Twelfth APS User Meeting Next Independent Investigator Proposals Due July 1, 2002 Research Highlight: "Edema Factor: Revealing the Structure of an Anthrax Toxin" Invitation to Submit Research Highlights Coming Events Operations Update 1. First APS/User Strategic Planning Meeting: A Success! (Contact: jmgibson@aps.anl.gov) An atmosphere of collegial interaction characterized the first APS/User Strategic Planning meeting as 115 APS staff members and users gathered to discuss the future. Plenary sessions focused on the APS mission and goals, the future of the Collaborative Access Team System, future innovations with third-generation sources, and operational funding for beamlines were

205

The APS and the 2012 Argonne Energy Showcase  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Acoustic Levitation Video Goes Viral Argonne Acoustic Levitation Video Goes Viral "Inside the Advanced Photon Source" Inside the latest Argonne Now APS Director Stephenson Named Argonne Distinguished Fellow Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Technology and Research Rose of APS and CNM One of Four DOE Early Career Award Winners APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed The APS and the 2012 Argonne Energy Showcase OCTOBER 1, 2012 Bookmark and Share Francesco De Carlo (at right in blue t-shirt) delighted visitors to the APS Energy Showecase by demonstrating three-dimensional tomography used by researchers at the APS in the search for new, energy-efficient materials.

206

IPNS upgrade: A feasibility study  

SciTech Connect

Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

NONE

1995-04-01T23:59:59.000Z

207

APS Long Range Operations Schedule FY2010  

NLE Websites -- All DOE Office Websites (Extended Search)

10) 10) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2009-3 2010-1 2010-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

208

APS Long Range Operations Schedule FY2009  

NLE Websites -- All DOE Office Websites (Extended Search)

09) 09) Alternate Formats: iCal | Excel | PDF APS Long Range Operation Schedule (FY2009) 2008-3 2009-1 2009-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

209

Climate balance of biogas upgrading systems  

SciTech Connect

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

2010-01-15T23:59:59.000Z

210

Microsoft Word - 2007 Cross Cut - APS response.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Cross Cut Review of Research in Structural Biology Cross Cut Review of Research in Structural Biology Advanced Photon Source January 24, 2007 Review Committee: J. R. Helliwell, University of Manchester, UK, APS SAC; Chair Howard Einspahr, Research Fellow, Bristol Myers Squibb (Retired), APS SAC Sine Larsen, European Synchrotron Radiation Facilities, External Reviewer Douglas Ohlendorf, University of Minnesota, External Reviewer Wei Yang, NIH, Bethesda, APS SAC Introduction: The reviewers met at the Advanced Photon Source (APS) on January 24, 2007, together with the APS Scientific Advisory Committee (SAC), which has a cross-disciplinary membership, to review structural biology science at the APS. The primary emphasis of the review was macromolecular crystallography (also known as protein crystallography

211

APS User News-at-a-Glance, Issue 9  

NLE Websites -- All DOE Office Websites (Extended Search)

9; September 7, 2001 9; September 7, 2001 Contents: 1. Wayne Hendrickson Selected as the 2001 APS Compton Award Recipient Gopal Shenoy named as Interim Associate Laboratory Director for the APS Eleventh Users Meeting for the APS Set for October 9-11, 2001 User Survey 2001 to Close September 14 CCRP/PEB Meetings To Be Held in September and October DOE-BES Baseline Program Review Slated for October 16-18, 2001 Study Guide for User Orientation Now on the Web 8. Check Your User Badge 9. Contact Your Host CAT before Bringing Materials or Samples to the APS 10. Operations Update 1. Wayne Hendrickson Selected as the 2001 APS Compton Award Recipient (Contact: strasser@aps.anl.gov) Wayne A. Hendrickson of Columbia University has been selected to receive the 2001 Advanced Photon Source Arthur H.

212

HERA Upgrade Project | Superconducting Magnet Division  

NLE Websites -- All DOE Office Websites (Extended Search)

HERA Upgrade Project HERA Upgrade Project As part of the HERA luminosity upgrade, 6 superconducting Interaction Region quadrupoles were delivered, accepted, and are in service. These 6 layer magnets were designed to include the main quadrupole focus, a skew quad, a normal and skew dipole, and a final sextupole layer. Because of the physical space constraints imposed by the existing detector region components, the DESY magnets were of necessity designed to be very compact. In addition, they are also are required to operate within the solenoidal detector fields at the collision points, so all construction materials had to be non magnetic. Two types of DESY magnets were fabricated. The first, designated as G0, was a two meter long, constant radius magnet. The second, designated GG, is a

213

ATLAS upgrade June09_v3  

NLE Websites -- All DOE Office Websites (Extended Search)

ATLAS efficiency and intensity upgrade ATLAS efficiency and intensity upgrade Guy Savard and Robert V. F. Janssens June 12, 2009 The ATLAS facility is on a constant quest to improve and increase the capabilities it offers to its Users. ATLAS currently provides beams of essentially all stable isotopes at energies in the vicinity of the Coulomb barrier. These can be used in conjunction with a suite of state-of-the-art instruments such as Gammasphere, the Fragment Mass Analyzer (FMA), the Canadian Penning Trap mass spectrometer (CPT), the split-pole spectrograph, an in-flight radioactive beam line, and the recently commissioned HELIOS spectrometer. At present, these capabilities are being augmented by (1) the addition of the CARIBU upgrade, which will provide low-intensity, neutron-rich radioactive beams from Californium fission fragments in both low-energy and re-

214

Instrumentation upgrades for the Macromolecular Crystallography beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Instrumentation upgrades for the Macromolecular Crystallography beamlines Instrumentation upgrades for the Macromolecular Crystallography beamlines of the Swiss Light Source Monday, October 29, 2012 - 2:00am SSRL, Bldg. 137, Rm. 322 Martin Fuchs, MX Group, Swiss Light Source; Paul Scherrer Institute (Villigen, Switzerland) A new unified diffractometer - the D3 - has been developed for the three MX beamlines. The first of the instruments is in general user operation at beamline X10SA since April 2012. The varied demands from both challenging academic research projects as well as high throughput industrial applications on today's macromolecular crystallography beamlines drive developments to both endstations and beamline optics. Recent instrumentation upgrades to the macromolecular crystallography (MX) beamlines of the Swiss Light Source therefore aimed to

215

APS User News-at-a-Glance 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy, Office of Science, About Science Media Center User Information Education Facility Search APS ... Search Button Argonne Home > Argonne Home > Advanced...

216

APS Protocol for Reporting Construction Vibration Issues for...  

NLE Websites -- All DOE Office Websites (Extended Search)

in the online version. Advanced Photon Source APS Protocol for Reporting Construction Vibration Issues for Beamlines Section where used: This procedure describes the process for...

217

Better Buildings Neighborhood Program: Energy Upgrade California Drives  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Upgrade Energy Upgrade California Drives Demand From Behind the Wheel to someone by E-mail Share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Facebook Tweet about Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Twitter Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Google Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Delicious Rank Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Digg Find More places to share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on

218

Missouri Water Treatment Plant Upgraded | Department of Energy  

Energy Savers (EERE)

Missouri Water Treatment Plant Upgraded Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water Treatment Plant are...

219

EECBG Success Story: Missouri Water Treatment Plant Upgraded...  

Energy Savers (EERE)

Missouri Water Treatment Plant Upgraded EECBG Success Story: Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water...

220

Bio-oils Upgrading for Second Generation Biofuels  

Science Journals Connector (OSTI)

Bio-oils Upgrading for Second Generation Biofuels ... The present review is then focused on the upgrading possibilities of renewable nonedible feedstocks, obtained from biomass fast pyrolysis or liquefaction, in petroleum refineries, toward the production of second generation biofuels. ...

Ins Graa; Jos M. Lopes; Henrique S. Cerqueira; Maria F. Ribeiro

2012-11-21T23:59:59.000Z

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Upgrading : an alternative approach towards housing reform in China  

E-Print Network (OSTI)

The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

He, Fang, 1956-

1989-01-01T23:59:59.000Z

222

EECBG Success Story: HVAC Upgrade Saving Money, Protecting History...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Upgrade Saving Money, Protecting History EECBG Success Story: HVAC Upgrade Saving Money, Protecting History November 2, 2010 - 5:37pm Addthis A new heating and cooling system...

223

UPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM  

E-Print Network (OSTI)

/11/2004 page 3 of 17 1 INTRODUCTION KNMI (Royal Netherlands Meteorological Institute) has upgraded itsUPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM Hans Beekhuis Iwan Holleman the Netherlands

Stoffelen, Ad

224

Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Bouse Substation Expansion and Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western has requested that APS relocate an existing 69kV transmission line. This will consist of replacing existing conductor and 69-kV Gang Operated Switch and installing 6 new steel monopole structures, an above ground primary meter and underground cable from the 3 phase transition. The project is located in La Paz County, Arizona. The legal description is Section 27 & 34 Township 8 North, Range 19 West on the Gila and Salt River Baseline and Meridian (USGS Black Peak & Bouse NW, AZ 7.5' maps). Western owns the land. This work is planned to begin the month of September 2011 and be completed by

225

Microsoft PowerPoint - 2007-APS_5  

NLE Websites -- All DOE Office Websites (Extended Search)

L. Lin, M. Porkolab, E.M. Edlund, L. Lin, M. Porkolab, E.M. Edlund, D.R. Ernst, C. Fiore, M. Greenwald, N. Tsujii Plasma Science and Fusion Center, MIT, Cambridge, MA, 02139 *Work supported by U. S. DOE under DE-FG02-94-ER54235 and DE-FC02-99-ER54512. 49 th Annual Meeting of the Division of Plasma Physics November 12-16, 2007 Orlando, Florida Drift Type Turbulence Studies with the Phase Contrast Imaging Diagnostic in Alcator C-Mod * Alcator C-Mod Outline * Phase Contrast Imaging (PCI) Diagnostic - Overview of the PCI system in C-Mod - Localization Upgrade * Turbulence and Transport Studies in ohmic plasmas - Experimental Measurements - Local Transport Analysis with TRANSP - Linear Gyrokinetic Analysis with GS2 * Experimental Identification of TEM in ITB plasmas Alcator C-Mod Principle of Phase Contrast Imaging

226

Nuclear Materials Safeguards and Security Upgrade Project Completed...  

NLE Websites -- All DOE Office Websites (Extended Search)

Safeguards and Security Upgrade Project Completed Under Budget | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering...

227

APS Beamline 6-ID-D  

NLE Websites -- All DOE Office Websites (Extended Search)

MM-Group Home MM-Group Home MMG Advisory Committees 6-ID-D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. This is a high energy (50 - 130 keV) beamline used for structural studies primarily on single crystal materials. Recent Research Highlights LuFeO Unlikely route to ferroelectricity May 16, 2012 A new type of ferroelectric, LuO2Fe4, has been investigated at the APS by a research team from Julich research center. XAS & XMCD studies on beamline 4-ID-C determined the Fe magnetism and valence, while single crystal x-ray scattering measurements at 6-ID-B & 6-ID-D probed the associated structural and charge ordering.

228

Microsoft PowerPoint - APS_07  

NLE Websites -- All DOE Office Websites (Extended Search)

Barriers in Barriers in Alcator C-Mod Catherine Fiore MIT Plasma Science and Fusion Center APS-DPP November 14, 2007 Orlando, Fl With Contributions from: W. L. Rowan † , A. Dominguez, A. E. Hubbard , A. Ince-Cushman, M. J. Greenwald, L. Lin, E.S. Marmar , M. Reinke, J. E. Rice, K. Zhurovich £ , MIT- PSFC, † FRC-UTA, £ Goldman Sachs Supported by US DoE C-Mod Alcator What's New: * Gyrokinetic stability study at ITB onset * Improved ion temperature profile measurements * Localization of fluctuation measurements * Ohmic H-mode ITBs Introduction: ITBs in Alcator C-Mod Internal Transport Barriers (ITBs) in C-Mod arise from steady H-mode plasmas lasting 2 or more energy confinement times when the central power input is low: they are seen in both Ohmic and Off-axis heated ICRF plasmas

229

APS News 2007 | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Albert Macrander named American Physical Society Fellow Albert Macrander named American Physical Society Fellow Albert Macrander named American Physical Society Fellow December 10, 2007 Albert Macrander of the Argonne X-ray Science Division (XSD) has been elected a Fellow of the American Physical Society. Michael Borland named American Physical Society Fellow Michael Borland named American Physical Society Fellow December 4, 2007 Michael Borland of the Argonne Accelerator Systems Division has been elected a Fellow of the American Physical Society. Grad student is officially a GEMS Grad student is officially a GEMS October 18, 2007 Tao Sun (Northwestern University), who is currently doing his thesis research at the APS, has been awarded one of three Graduate Excellence in Materials Science Diamond awards by the Basic Science

230

2004 Users Meeting for the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

May 3-6, 2004 May 3-6, 2004 Argonne National Laboratory Argonne, Illinois DATES TO REMEMBER March 15 Franklin Award deadline April 1 Registration deadline for non-U.S. citizens April 5 Abstract deadline April 19 Housing deadline Registration deadline . Technical Program Schedule-at-a-Glance Comprehensive Program Workshops Banquet Exhibitors/Sponsors Participation Call for Poster Abstracts APSUO Steering Committee Elections VOTE NOW Rosalind Franklin Young Investigator Award Practical Matters Registration Form General Information Travel and Housing Arrangements CNM Meeting Meeting Information APS Users Organization Steering Committee Stephen Durbin, Chairman Mark Rivers, Vice-Chairman Malcolm Capel Lin Chen David Cookson Julie Cross Stephan Ginell Gene Ice Lisa Keefe John Rose Sunil Sinha Carol Thompson

231

APS 7-BM Beamline: 7-BM Home  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview of the 7-BM beamline Overview of the 7-BM beamline The 7-BM beamline is dedicated to time-resolved measurements of complex fluid flowfields using x-ray radiography and fluorescence spectroscopy. Funding for the final commissioning of 7-BM was provided by the DOE Office of Energy Efficiency and Renewable Energy. Commissioning was completed at the end of FY2012. The beamline is currently operated by the X-Ray Science Division of the APS. Major Areas of Research Fuel sprays from automotive fuel injectors, both diesel and gasoline. See more on the X-Ray Fuel Spray web page from Argonne's Energy Systems Division. Sprays for air-breathing propulsion. Fuel injection for rocket injectors. Gas-phase fuel injection and mixing. Beamline Performance Total flux: 4 x 1011 ph/s at 8 keV Energy range: 5.5 - 11 keV, 1.4% ΔE/E

232

APS Beamline 6-ID-B,C  

NLE Websites -- All DOE Office Websites (Extended Search)

B,C Home B,C Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-B,C Beamline 6-ID-B,C is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. Research on this beamline centers on general x-ray scattering studies of materials. The beamline has 2 end-stations: 6-ID-B: Psi -Diffractomter & In-Field Studies 6-ID-C: UHV in-situ growth Recent Research Highlights LSMO pictures Searching for Next-Generation Electronic Materials December 14, 2009 A new class of layered oxide materials discovered thanks to research at the beamline 6-ID-B offers scientists unprecedented opportunities for creating the next generation of electronic devices. Local Contact: Phil Ryan Local Contacts: Philip Ryan (Surface Diffraction) 630.252.0252 ryan@aps.anl.gov

233

APS Preliminary Beamline Design Report Guide  

NLE Websites -- All DOE Office Websites (Extended Search)

PRELIMINARY BEAMLINE DESIGN REPORT PRELIMINARY BEAMLINE DESIGN REPORT December 5, 1994 5.1 Preliminary Beamline Design: General Guidelines The Preliminary Design of the beamline represents an approximately 30% design level of each of the beamline components. This level of design permits the CAT to develop cost estimates for the construction of the beamline, as well as a realistic timeline for completion of the construction tasks. A committee from the APS has been charged with reviewing the Preliminary Design Reports and has established the evaluation criteria described below. The Preliminary Beamline Report is expected to expand upon the Conceptual Design Report in the following areas: Beamline Layout Component Design Work Breakdown Structure Cost and Schedule Additional Operational Requirements

234

200711aps_ko_draft4.ai  

NLE Websites -- All DOE Office Websites (Extended Search)

on MSE: Experiment on MSE: Experiment J. Ko, S. Scott a , W. Rowan b , R. Granetz, I. Hutchinson, H. Yuh c , Paul Bonoli, and Ron Parker Plasma Science and Fusion Center, Massachusetts Institute of Technology, Cambridge, MA, USA a Princeton Plasma Physics Laboratory, Princeton, NJ, USA b Fusion Research Center, University of Texas, Austin, TX, USA c Nova Photonics, Inc., NJ, USA 49th Annual Meeting of APS DPP November 12 - 16, 2007 Orlando, Florida Abstract It has been conjectured that the anomalous results obtained previously during beam-into-gas calibrations of the Motional Stark Effect (MSE) diagnostic on Alcator C-Mod are caused by the 'secondary' beam neutrals - the neutrals that ionize following collisions with the torus gas and then re-charge

235

APS User Safety Update (10 April 2006)  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety Update (12 April 2006) Safety Update (12 April 2006) Argonne is in the process of revitalizing its safety program. APS presently is reviewing user training to address recent changes in Argonne electrical safety requirements and to ensure an efficient manner of implementing those requirements. In addition, several recent occurrences involving users have demonstrated a need to improve communication of Argonne specific requirements. The purpose of this message is to provide interim guidance until final changes are implemented in a few months. New Electrical Safety Training Requirements Argonne recently released new requirements regarding training requirements to perform a variety of tasks involving electrical equipment: ESH377 Electrical Safety Awareness is required for all employees and users regardless of

236

The positron accumulator ring for the APS  

SciTech Connect

The Positron Accumulator Ring (PAR) is designed to accumulate and damp positrons from the 450-MeV linac during the 0.5-s cycle time of the injector synchrotron for the APS 7-GeV storage ring. During 0.4 s of each synchrotron cycle, up to 24 linac pulses are injected into the horizontal phase space of the PAR at a 60-Hz rate. Each injected pulse occupies about 1.3 of the circumference of the accumulator ring. After 0.1 s for longitudinal damping, the single accumulated bunch is transferred to one of the 353-MHz buckets of the injector synchrotron RF system. The bunch is accelerated to 7 GeV and transferred to the storage ring, while the PAR accumulates the next bunch of positrons. 2 refs., 3 figs., 2 tabs.

Crosbie, E.A.

1989-01-01T23:59:59.000Z

237

Work Authorization Document NSTX Upgrade Project  

E-Print Network (OSTI)

Work Authorization Document NSTX Upgrade Project Control Account #: 7900 Title: WBS 1.7.3 Title Functional Manager L. Dudek Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary procedures and documents to support the integrated tests, and to support performance of the pre

Princeton Plasma Physics Laboratory

238

Steam turbine upgrades: A utility based approach  

SciTech Connect

In the increasingly competitive power generation markets utilities must strive towards lower electricity generation costs, whilst relying on an aging steam turbine fleet. By the year 2000 more than 25% of the global steam turbine capacity will be older than 30 years. The heat rate of such units is generally considerably higher than that of equivalent new plant, and such equipment can be further disadvantaged by increased maintenance costs and forced outage rates. Over the past decade steam turbine conversion, modification, and upgrade packages have become an increasingly important part of the European steam turbine market. Furthermore, many utilities now realize that enhanced cost-effectiveness can often be obtained by moving away from the original equipment manufacturer (OEM), and the upgrading of other manufacturers' plant is now routine within the steam turbine industry. By working closely with customers, GE has developed a comprehensive range of steam turbine upgrade packages, including advanced design steampaths which can increase the performance of existing turbine installations to levels comparable with new plant. Such packages are tailor-made to the requirements of each customer, to ensure that the most cost-effective engineering solution is identified. This paper presents an overview of GE's state-of-the-art steam turbine technology, and continues to describe typical economic models for turbine upgrades.

Wakeley, G.R.

1998-07-01T23:59:59.000Z

239

MAST-Upgrade Advancing compact fusion sources  

E-Print Network (OSTI)

of innovation. It will also put the UK in a leading position to develop engineering systems for the future to the drive towards commercial fusion power. 1. Testing reactor concepts. MAST-Upgrade will be the first machine to include the Super-X divertor design, an innovative plasma exhaust system that, if successful

240

ATLAS Upgrades Towards the High Luminosity LHC  

E-Print Network (OSTI)

After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb?1 expected for LHC running to 3000 fb?1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data a...

Cinca, D; The ATLAS collaboration

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

CMS: Present status, limitations, and upgrade plans  

SciTech Connect

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab; ,

2011-09-01T23:59:59.000Z

242

Work Authorization Document NSTX Upgrade Project  

E-Print Network (OSTI)

heating system. The system will be composed of an AC/DC power conversion system, gyrotron source or other operational characteristic for the system will require upgrade. Only disruption qualification The Electron Cyclotron Heating System provides breakdown and startup assist through an electron cyclotron

Princeton Plasma Physics Laboratory

243

Financing Energy Upgrades for K-12 School Districts  

NLE Websites -- All DOE Office Websites (Extended Search)

Financing Energy Upgrades for K-12 School Districts Financing Energy Upgrades for K-12 School Districts Page 2 Table of Contents Introduction................................................................................................................................................................................................................... 4 What This Guide Covers .................................................................................................................................................................................. 6 Chapter 1: Principles of Financing Energy Upgrades for Schools .................................................................................................. 7 Principle 1. Start with Clear Project Objectives.......................................................................................................................................... 7

244

ANL/APS/TB-34 Experimental Facilities Division  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 Experimental Facilities Division Progress Report 1997-98 September 1998 iii Table of Contents Acronyms...................................................................................................................................... vii 1 INTRODUCTION 1.1 Background .................................................................................................................1 1.2 Mission of the APS Experimental Facilities Division ................................................2 1.3 APS User Sector Layout .............................................................................................2 1.4 XFD Organization.......................................................................................................3 1.5 User Operations

245

ANL/APS/TB-24 Diamond Monochromators for APS Undulator-A Beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 Diamond Monochromators for APS Undulator-A Beamlines R.C. Blasdell, L. A. Assoufid, and D. M. Mills TABLE OF CONTENTS 1. INTRODUCTION .................................................................................1 2. PHYSICAL PROPERTIES OF DIAMONDS ..................................................5 2.1 Varieties of Diamonds ....................................................................5 2.2 The Lattice Parameter .....................................................................5 2.3 Bulk Thermal and Mechanical Properties ...............................................6 2.4 Typical Surface and Lattice Plane Morphology ......................................8 2.5 The Liquid-GaIn/Diamond Interface ...................................................10 3. DIFFRACTION PROPERTIES OF DIAMOND

246

ANL/APS/TB-14 APS Beamline Design and Construction Requirements:  

NLE Websites -- All DOE Office Websites (Extended Search)

14 14 APS Beamline Design and Construction Requirements: A Reference Manual for Designers and Builders Version 1.0 May 1994 iii TABLE OF CONTENTS SECTION I DEFINITIONS, GUIDELINES, AND REVIEW CRITERIA ............................1 1. Introduction (July 21, 1998) ...............................................................................................1 1.1 About the Advanced Photon Source ...........................................................................1 1.2 About this Manual.......................................................................................................1 2. Beamline Definitions and Responsibilities (July 21, 1998) .................................................2 2.1 Definitions...................................................................................................................2

247

To make an appointment with a Peer Advisor, visit the SURF  

E-Print Network (OSTI)

To make an appointment with a Peer Advisor, visit the SURF website at http:// www.unc.edu/depts/our/ students/fellowship_supp/ surf.html and scroll down to find the link to the SURF Peer Advisor Request Form by the Office for Undergraduate Research. peeradvising EUISMOD ELEMENTUM SURF Peer Advisors are available

Engel, Jonathan

248

Policy Guidance Memorandum #37 Procedures for Excepted Service Exceptionally Well Qualified (EWQ) Appointments  

Energy.gov (U.S. Department of Energy (DOE))

DOE received a new hiring flexibility under the Consolidated Appropriations Act of 2014 that allows us to appoint up to 120 exceptionally well qualified (EWQ) individuals to scientific, engineering, or other critical technical positions without regard to chapter 33 of title 5, USC.

249

University Safety Partners Mission Statement The University Safety Partners (USP) is a group of appointed representatives  

E-Print Network (OSTI)

the work environment at Stanford. The role of University Safety Partners is to: · Advise the UniversityUniversity Safety Partners Mission Statement The University Safety Partners (USP) is a group of appointed representatives who are responsible for the administration of the University's health and safety

250

EXCERPT FROM THE 2012-2014 AGREEMENT ON CONDITIONS OF APPOINTMENT FOR FACULTY  

E-Print Network (OSTI)

and significance, or, in appropriate fields, distinguished, creative or professional work of a scholarly nature in maintaining academic strength and balance but no person holding a term appointment with review shall be denied of the instructor, as indicated by command over subject matter, familiarity with recent developments in the field

Pulfrey, David L.

251

EXCERPT FROM THE 2012-2014 AGREEMENT ON CONDITIONS OF APPOINTMENT FOR FACULTY  

E-Print Network (OSTI)

and significance, or, in appropriate fields, distinguished, creative or professional work of a scholarly nature are normally for a term of three years, with review, but in exceptional circumstances may be for a lesser in maintaining academic strength and balance but no person holding a term appointment with review shall be denied

Pulfrey, David L.

252

Resolution to Support the Extension of the Tenure Clock for Johnson School Faculty Appointments  

E-Print Network (OSTI)

Resolution to Support the Extension of the Tenure Clock for Johnson School Faculty Appointments of the other business schools and universities with which the Johnson School competes for assistant professors, Whereas the Johnson School is significantly hampered in its recruitment and retention of promising

Hemami, Sheila S.

253

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Three-year Term Appointment in Process (Oil and Gas) Engineering  

E-Print Network (OSTI)

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Three-year Term Appointment in Process (Oil and Gas with oil and gas specialization at the assistant- or associate professor-level, commencing April 12, 2010 in the area of oil and gas, and process engineering, to supervise graduate students, to participate in other

George, Glyn

254

Secretary Chu Statement on AP1000 Reactor Design Certification | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary Chu Statement on AP1000 Reactor Design Certification Secretary Chu Statement on AP1000 Reactor Design Certification Secretary Chu Statement on AP1000 Reactor Design Certification December 22, 2011 - 3:25pm Addthis Washington, D.C. - U.S. Energy Secretary Steven Chu issued the following statement today in support of the Nuclear Regulatory Commission's (NRC) decision to certify Westinghouse Electric's AP1000 nuclear reactor design, a significant step towards constructing a new generation of U.S. nuclear reactors. In February 2010, the Obama Administration announced the offer of a conditional commitment for a $8.33 billion loan guarantee for the construction and operation of two AP1000 reactors at Alvin W. Vogtle Electric Generation Plant in Burke, Georgia. "The Administration and the Energy Department are committed to restarting

255

APS team works smarter, cuts substation construction costs by 36%  

SciTech Connect

An aggressive, cost-cutting, team of T D employees at Arizona Public Service Co (APS) is building a new distribution substation in Phoenix for less than half the original cost that APS planners had calculated for the project's land, labor and materials. Scheduled for service in June of this year, APS analysts had originally projected land, labor and materials costs for the 20-MVA Bell substation at nearly $1.7-million-not including major equipment such as transformers, circuit breakers, and switches. However, after studying the project, an empowered APS crew was able to slash 36% off the original estimate-more than $610,000. What's more, APS spokesmen say that its new approach to substation construction and design has given its engineers and construction crews a laundry list of additional ideas to try out on future substation ventures. 4 figs., 1 tab.

Not Available

1993-05-01T23:59:59.000Z

256

Short Pulse X-rays at the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

Short Pulse X-rays at the APS Workshop Summary Friday, May 9, 2008 Building 401, Room A5000 Organizers: Jin Wang (Argonne National Laboratory), Lin Chen (Argonne National Laboratory), David Reis ( University of Michigan ), Paul Evans ( University of Wisconsin ), Ali Nassiri (Argonne National Laboratory), and Linda Young ( Argonne National Laboratory) Agenda Registration - complete the visitor registration form. For "purpose of visit," please enter "APS SPX Workshop" https://www.aps.anl.gov/About/Visiting/visitor_registration.php On-site lodging is at the Argonne Guest House http://www.anlgh.org/ Travel to Argonne National Laboratory http://www.aps.anl.gov/About/Visiting/Directions/ Fees There is no charge for this workshop. Since the 2004 Lake Geneva Workshop, the APS has performed three years of

257

Upgrade of CEBAF from 6 Gev To 12 Gev: Status  

SciTech Connect

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

Harwood, Leigh [Jefferson Lab, 12000 Jefferson Ave, Newport News, VA, 23606 (United States)

2013-04-19T23:59:59.000Z

258

Energy Star Building Upgrade Value Calculator | Open Energy Information  

Open Energy Info (EERE)

Energy Star Building Upgrade Value Calculator Energy Star Building Upgrade Value Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Star Building Upgrade Value Calculator (for Office Properties) Agency/Company /Organization: ENERGY STAR Phase: "Evaluate Options and Determine Feasibility" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property. User Interface: Spreadsheet Website: www.energystar.gov/index.cfm?c=comm_real_estate.building_upgrade_value The Building Upgrade Value Calculator allows practitioners to analyze the

259

ATU Advanced Technology Upgrading Ltd | Open Energy Information  

Open Energy Info (EERE)

ATU Advanced Technology Upgrading Ltd ATU Advanced Technology Upgrading Ltd Jump to: navigation, search Name ATU (Advanced Technology Upgrading) Ltd Place Israel Product Focused on development of rechargeable magnesium battery. References ATU (Advanced Technology Upgrading) Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. ATU (Advanced Technology Upgrading) Ltd is a company located in Israel . References ↑ "ATU (Advanced Technology Upgrading) Ltd" Retrieved from "http://en.openei.org/w/index.php?title=ATU_Advanced_Technology_Upgrading_Ltd&oldid=342420" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

260

Raising the acceptance of the AP2-line  

SciTech Connect

The 120 GeV Main Ring proton beam collides with the target at the end of the AP-1 line and creates antiprotons and other secondary particles. The AP-2 line transfers the negative particles from the target to the Debuncher. To provide a bigger antiproton stack size in the Accumulator, both the Debuncher as well as the AP-2 line acceptance have to be raised. This is a proposal for the improvement of the AP-2 line acceptance. The first part of the memo presents an acceptance examination of the existing AP-2 line by computer simulation, while the second presents a short proposal for aperture corrections. The computer program TURTLE was used to trace antiprotons through the AP-2 line without taking into account other negative charged particles. Betatron functions were obtained from the output of the SYNCH computer program. The SYNCH program was also used to check the dispersion match between the AP-2 line and the Debuncher. 3 refs., 6 figs., 5 tabs.

Trbojevic, D.

1989-04-05T23:59:59.000Z

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

E-Print Network 3.0 - advanced design ap1000 Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

BLAS Peter Strazdins, Summary: on the Fujitsu AP1000 and AP+ parallel computers. The comparison is based on LU and LLT decomposition benchmarks... .23 (LLT) for moderate sized...

262

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network (OSTI)

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

Adare, A; Aidala, C; Ajitanand, N N; Akiba, Y; Akimoto, R; Alexander, J; Aoki, K; Apadula, N; Asano, H; Atomssa, E T; Awes, T C; Azmoun, B; Babintsev, V; Bai, M; Bai, X; Bandara, N; Bannier, B; Barish, K N; Baron, O; Bassalleck, B; Bathe, S; Baublis, V; Baumgart, S; Bazilevsky, A; Beaumier, M; Beckman, S; Belmont, R; Benjamin, G; Berdnikov, A; Berdnikov, Y; Blackburn, J; Blau, D S; Bobrek, M; Bok, J; Boose, S; Boyle, K; Britton,, C L; Brooks, M L; Bryslawskyj, J; Bumazhnov, V; Butler, C; Butsyk, S; Campbell, S; Carollo, A; Chai, J -S; Chen, C -H; Chernichenko, S; Chi, C Y; Chiu, M; Choi, I J; Choi, J B; Choi, S; Chollet, S; Christiansen, P; Chujo, T; Cianciolo, V; Citron, Z; Cole, B A; Cronin, N; Crossett, N; Csand, M; D'Orazio, L; Dairaku, S; Danley, D; Datta, A; Daugherity, M S; David, G; DeBlasio, K; Debraine, A; Dehmelt, K; Denisov, A; Deshpande, A; Desmond, E J; Dietzsch, O; Ding, L; Dion, A; Diss, P B; Do, J H; Donadelli, M; Drapier, O; Drees, A; Drees, K A; Durham, J M; Durum, A; Eberle, L; Efremenko, Y V; Engelmore, T; Enokizono, A; Esumi, S; Eyser, K O; Fadem, B; Feege, N; Fields, D E; Finger, M; FingerJr., M; Fleuret, F; Fokin, S L; Frantz, J E; Franz, A; Frawley, A D; Fukao, Y; Fusayasu, T; Gainey, K; Gal, C; Gallus, P; Garg, P; Garishvili, A; Garishvili, I; Gastaldi, F; Ge, H; Giannotti, P; Giordarno, F; Glenn, A; Gong, X; Gonin, M; Goto, Y; de Cassagnac, R Granier; Grau, N; Greene, S V; Perdekamp, M Grosse; Gu, Y; Gunji, T; Guragain, H; Hachiya, T; Haggerty, J S; Hahn, K I; Hamagaki, H; Hamilton, H F; Han, S Y; Hanks, J; Hasegawa, S; Haseler, T O S; Hashimoto, K; Hayano, R; Hayashi, S; He, X; Hemmick, T K; Hester, T; Hill, J C; Hoefferkamp, M; Hollis, R S; Homma, K; Hong, B; Hori, Y; Hoshino, T; Huang, J; Huang, S; Hutchins, J R; Ichihara, T; Ikeda, Y; Imai, K; Imazu, Y; Imrek, J; Inaba, M; Iordanova, A; Isenhower, D; Isinhue, A; Isupov, A; Ivanischev, D; Ivanov, V; Jacak, B V; Jeon, S J; Jezghani, M; Jia, J; Jiang, X; Johnson, B M; Joo, K S; Jouan, D; Jumper, D S; Kamin, J; Kanda, S; Kang, B H; Kang, J H; Kang, J S; Kapustinsky, J; Karatsu, K; Kawall, D; Kazantsev, A V; Kehayias, H -J; Key, J A; Khachatryan, V; Khandai, P K; Khanzadeev, A; Kijima, K M; Kim, C; Kim, D H; Kim, D J; Kim, E -J; Kim, H J; Kim, K -B; Kim, M; Kim, Y -J; Kim, Y K; Kimelman, B; Kiss, ; Kistenev, E; Kitamura, R; Klatsky, J; Kleinjan, D; Kline, P; Koblesky, T; Kochenda, L; Kofarago, M; Komatsu, Y; Komkov, B; Koster, J; Kotchetkov, D; Kotov, D; Kravtsov, P; Krizek, F; Kurita, K; Kuriyama, M; Kurosawa, M; Kwon, Y; Lacey, R; Lai, Y S; Lajoie, J G; Lebedev, A; Lee, G H; Lee, J; Lee, K B; Lee, K S; Lee, S; Lee, S H; Lefferts, R; Leitch, M J; Leite, M A L; Leitgab, M; Lewis, B; Li, X; Lim, S H; Lipski, A; Litvinenko, A; Liu, M X; Love, B; Lynch, D; Lynch, M; Maguire, C F; Makdisi, Y I; Makek, M; Malakhov, A; Manion, A; Manko, V I; Mannel, E; Maruyama, T; Masumoto, S; McCumber, M; McGaughey, P L; McGlinchey, D; McKay, R; McKinney, C; Meles, A; Mendoza, M; Menegasso, R; Meredith, B; Miake, Y; Mibe, T; Mignerey, A C; Milov, A; Mishra, D K; Mitchell, J T; Miyasaka, S; Mizuno, S; Mohanty, A K; Montuenga, P; Moon, T; Morrison, D P; Moskowitz, M; Motschwiller, S; Moukhanova, T V; Murakami, T; Murata, J; Mwai, A; Nagae, T; Nagamiya, S; Nagashima, K; Nagle, J L; Nagy, M I; Nakagawa, I; Nakagomi, H; Nakamiya, Y; Nakamura, K R; Nakamura, T; Nakano, K; Nattrass, C; Nederlof, A; Netrakanti, P K; Nihashi, M; Niida, T; Ninomiya, K; Nishimura, S; Northacker, D; Nouicer, R; Novak, T; Novitzky, N; Nukariya, A; Nyanin, A S; O'Brien, E; Ogilvie, C A; Oide, H; Okada, K; Koop, J D Orjuela; Osborn, J D; Oskarsson, A; sterman, L; Ozawa, K; Pancake, C; Pantuev, V; Papavassiliou, V; Park, I H; Park, J S; Park, S; Park, S K; Pate, S F; Patel, L; Patel, M; Peng, J -C; Perepelitsa, D; Perera, G D N; Peresedov, V; Peressounko, D Yu; Perry, J; Petti, R; Pinkenburg, C; Pinson, R; Pisani, R P; Popule, J; Purschke, M L; Qu, H; Radhakrishnan, S; Rak, J; Ramson, B J; Ravinovich, I; Read, K F; Reynolds, D; Reynolds, R; Riabov, V; Riabov, Y; Richardson, E; Rinn, T; Riveli, N; Roach, D; Rolnick, S D; Rosati, M; Roschin, E; Rowan, Z; Rubin, J G; Rukoyatkin, P; Ryu, M S; Safonov, A; Sahlmueller, B; Saito, N; Sakaguchi, T; Sako, H; Samsonov, V; Sano, M; Sarsour, M; Sato, S; Sawada, S; Schaefer, B; Schmoll, B K; Sedgwick, K; Seele, J; Seidl, R; Sekiguchi, Y; Sen, A; Seto, R; Sett, P; Sexton, A; Shafto, E; Sharma, D; Shaver, A; Shein, I; Shibata, T -A; Shigaki, K; Shimomura, M; Shoji, K; Shukla, P; Sicho, P; Sickles, A; Silva, C L; Silvermyr, D; Singh, B K; Singh, C P; Singh, V; Sippach, F W; Skolnik, M; Snowball, M; Solano, S; Soldatov, A; Soltz, R A; Sondheim, W E; Sorensen, S P; Soumya, M; Sourikova, I V; Stankus, P W; Steinberg, P; Stenlund, E; Stepanov, M; Ster, A; Stevens, L; Stoll, S P; Stone, M R; Sugitate, T; Sukhanov, A; Sumita, T; Sun, J; Sziklai, J; Takagui, E M

2015-01-01T23:59:59.000Z

263

CHALLENGES FOR THE SNS RING ENERGY UPGRADE  

SciTech Connect

The Oak Ridge Spallation Neutron Source accumulator ring presently operates at a beam power of about 1 MW with a beam energy of about 910 MeV. A power upgrade is planned to increase the beam energy to 1.3 GeV. For the accumulator ring this mostly involves modifications to the injection and extraction sections. A variety of modifications to the existing injection section were necessary to achieve 1 MW, and the tools developed and the lessons learned from this work are now being applied to the design of the new injection section. This paper will discuss the tools and the lessons learned, and also present the design and status of the upgrades to the accumulator ring.

Plum, Michael A [ORNL; Gorlov, Timofey V [ORNL; Holmes, Jeffrey A [ORNL; Hunter, W Ted [ORNL; Roseberry, Jr., R Tom [ORNL; Wang, Jian-Guang [ORNL

2012-01-01T23:59:59.000Z

264

The PS Upgrade Program: Recent Advances  

E-Print Network (OSTI)

The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existing injector complex at CERN to match the future requirements of the HL-LHC (High Luminosity LHC). In this framework, the Proton Synchrotron (PS) will undergo fundamental changes for many of its main systems: the injection energy will be increased to reduce space-charge effects, the transverse damper will be improved to cope with transverse instabilities, and the RF systems will be upgraded to accelerate higher beam intensity and brightness. These hardware improvements are triggered by a series of studies meant to identify the most critical performance bottlenecks, like space charge, impedances, longitudinal and transverse instabilities, as well as electron-cloud. Additionally, alternative production schemes for the LHC-type beams have been proposed and implemented to circumvent some of the present limitations. A summary of the most recent advances of the studies, as well as the proposed hardware improvements is...

Gilardoni, SS; Bertone, C; Biancacci, N; Blas, A; Damjanovic, S; Bodart, D; Borburgh, J; Chiggiato, P; Damerau, H; Devine, JD; Dobers, T; Gourber-Pace, M; Hancock, S; Huschauer, A; Iadarola, G; Lopez Hernandez, LA; Masi, A; Mataguez, S; Metral, E; Paoluzzi, M; Persichelli, S; Pittet, S; Rossi, C; Roesler, S; Rumolo, G; Salvant, B; Steerenberg, R; Sterbini, G; Vollaire, J; Wasef, R; Ventura, L; Yin Vallgren, C; Migliorati, M

2013-01-01T23:59:59.000Z

265

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network (OSTI)

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

A. Adare; S. Afanasiev; C. Aidala; N. N. Ajitanand; Y. Akiba; R. Akimoto; J. Alexander; K. Aoki; N. Apadula; H. Asano; E. T. Atomssa; T. C. Awes; B. Azmoun; V. Babintsev; M. Bai; X. Bai; N. Bandara; B. Bannier; K. N. Barish; O. Baron; B. Bassalleck; S. Bathe; V. Baublis; S. Baumgart; A. Bazilevsky; M. Beaumier; S. Beckman; R. Belmont; G. Benjamin; A. Berdnikov; Y. Berdnikov; J. Blackburn; D. S. Blau; M. Bobrek; J. Bok; S. Boose; K. Boyle; C. L. Britton, Jr.; M. L. Brooks; J. Bryslawskyj; V. Bumazhnov; C. Butler; S. Butsyk; S. Campbell; A. Carollo; J. -S. Chai; C. -H. Chen; S. Chernichenko; C. Y. Chi; M. Chiu; I. J. Choi; J. B. Choi; S. Choi; S. Chollet; P. Christiansen; T. Chujo; V. Cianciolo; Z. Citron; B. A. Cole; N. Cronin; N. Crossett; M. Csand; L. D'Orazio; S. Dairaku; D. Danley; A. Datta; M. S. Daugherity; G. David; K. DeBlasio; A. Debraine; K. Dehmelt; A. Denisov; A. Deshpande; E. J. Desmond; O. Dietzsch; L. Ding; A. Dion; P. B. Diss; J. H. Do; M. Donadelli; O. Drapier; A. Drees; K. A. Drees; J. M. Durham; A. Durum; L. Eberle; Y. V. Efremenko; T. Engelmore; A. Enokizono; S. Esumi; K. O. Eyser; B. Fadem; N. Feege; D. E. Fields; M. Finger; M. FingerJr.; F. Fleuret; S. L. Fokin; J. E. Frantz; A. Franz; A. D. Frawley; Y. Fukao; T. Fusayasu; K. Gainey; C. Gal; P. Gallus; P. Garg; A. Garishvili; I. Garishvili; F. Gastaldi; H. Ge; P. Giannotti; F. Giordarno; A. Glenn; X. Gong; M. Gonin; Y. Goto; R. Granier de Cassagnac; N. Grau; S. V. Greene; M. Grosse Perdekamp; Y. Gu; T. Gunji; H. Guragain; T. Hachiya; J. S. Haggerty; K. I. Hahn; H. Hamagaki; H. F. Hamilton; S. Y. Han; J. Hanks; S. Hasegawa; T. O. S. Haseler; K. Hashimoto; R. Hayano; S. Hayashi; X. He; T. K. Hemmick; T. Hester; J. C. Hill; M. Hoefferkamp; R. S. Hollis; K. Homma; B. Hong; Y. Hori; T. Hoshino; J. Huang; S. Huang; J. R. Hutchins; T. Ichihara; Y. Ikeda; K. Imai; Y. Imazu; J. Imrek; M. Inaba; A. Iordanova; D. Isenhower; A. Isinhue; A. Isupov; D. Ivanischev; V. Ivanov; B. V. Jacak; S. J. Jeon; M. Jezghani; J. Jia; X. Jiang; B. M. Johnson; K. S. Joo; D. Jouan; D. S. Jumper; J. Kamin; S. Kanda; B. H. Kang; J. H. Kang; J. S. Kang; J. Kapustinsky; K. Karatsu; D. Kawall; A. V. Kazantsev; H. -J. Kehayias; J. A. Key; V. Khachatryan; P. K. Khandai; A. Khanzadeev; K. M. Kijima; C. Kim; D. H. Kim; D. J. Kim; E. -J. Kim; H. J. Kim; K. -B. Kim; M. Kim; Y. -J. Kim; Y. K. Kim; B. Kimelman; . Kiss; E. Kistenev; R. Kitamura; J. Klatsky; D. Kleinjan; P. Kline; T. Koblesky; L. Kochenda; M. Kofarago; Y. Komatsu; B. Komkov; J. Koster; D. Kotchetkov; D. Kotov; P. Kravtsov; F. Krizek; K. Kurita; M. Kuriyama; M. Kurosawa; Y. Kwon; R. Lacey; Y. S. Lai; J. G. Lajoie; A. Lebedev; G. H. Lee; J. Lee; K. B. Lee; K. S. Lee; S. Lee; S. H. Lee; R. Lefferts; M. J. Leitch; M. A. L. Leite; M. Leitgab; B. Lewis; X. Li; S. H. Lim; A. Lipski; A. Litvinenko; M. X. Liu; B. Love; D. Lynch; M. Lynch; C. F. Maguire; Y. I. Makdisi; M. Makek; A. Malakhov; A. Manion; V. I. Manko; E. Mannel; T. Maruyama; S. Masumoto; M. McCumber; P. L. McGaughey; D. McGlinchey; R. McKay; C. McKinney; A. Meles; M. Mendoza; R. Menegasso; B. Meredith; Y. Miake; T. Mibe; A. C. Mignerey; A. Milov; D. K. Mishra; J. T. Mitchell; S. Miyasaka; S. Mizuno; A. K. Mohanty; P. Montuenga; T. Moon; D. P. Morrison; M. Moskowitz; S. Motschwiller; T. V. Moukhanova; T. Murakami; J. Murata; A. Mwai; T. Nagae; S. Nagamiya; K. Nagashima; J. L. Nagle; M. I. Nagy; I. Nakagawa; H. Nakagomi; Y. Nakamiya; K. R. Nakamura; T. Nakamura; K. Nakano; C. Nattrass; A. Nederlof; P. K. Netrakanti; M. Nihashi; T. Niida; K. Ninomiya; S. Nishimura; D. Northacker; R. Nouicer; T. Novak; N. Novitzky; A. Nukariya; A. S. Nyanin; E. O'Brien; C. A. Ogilvie; H. Oide; K. Okada; J. D. Orjuela Koop; J. D. Osborn; A. Oskarsson; L. sterman; K. Ozawa; C. Pancake; V. Pantuev; V. Papavassiliou; I. H. Park; J. S. Park; S. Park; S. K. Park; S. F. Pate; L. Patel; M. Patel; J. -C. Peng; D. Perepelitsa; G. D. N. Perera; V. Peresedov; D. Yu. Peressounko; J. Perry; R. Petti; C. Pinkenburg; R. Pinson; R. P. Pisani; J. Popule; M. L. Purschke; H. Qu; S. Radhakrishnan; J. Rak; B. J. Ramson; I. Ravinovich; K. F. Read; D. Reynolds; R. Reynolds; V. Riabov; Y. Riabov; E. Richardson; T. Rinn; N. Riveli; D. Roach; S. D. Rolnick; M. Rosati; E. Roschin; Z. Rowan; J. G. Rubin; P. Rukoyatkin; M. S. Ryu; A. Safonov; B. Sahlmueller; N. Saito; T. Sakaguchi; H. Sako; V. Samsonov; M. Sano; M. Sarsour; S. Sato; S. Sawada; B. Schaefer; B. K. Schmoll; K. Sedgwick; J. Seele; R. Seidl; Y. Sekiguchi; A. Sen; R. Seto; P. Sett; A. Sexton; E. Shafto; D. Sharma; A. Shaver; I. Shein; T. -A. Shibata; K. Shigaki; M. Shimomura; K. Shoji; P. Shukla; P. Sicho; A. Sickles; C. L. Silva; D. Silvermyr; B. K. Singh; C. P. Singh; V. Singh; F. W. Sippach; M. Skolnik; M. Snowball; S. Solano; A. Soldatov; R. A. Soltz; W. E. Sondheim; S. P. Sorensen; M. Soumya; I. V. Sourikova; P. W. Stankus

2015-01-25T23:59:59.000Z

266

Top-up operation experience at APS.  

SciTech Connect

The Advanced Photon Source (APS) is a 7-OeV, third-generation synchrotrons radiation source. To provide more stable beam for users, in September 1998 we began commissioning a new operating mode called ''top-up.'' In this mode, the beam current does not decay but is maintained at a high level using frequent injection, while photon shutters are open and photon beams are delivered to users. The hardware, software, and safety requirements for top-up will be reported. Safety issues related to injection with open photon shutters are covered in companion papers in this conference. Recent operational experience includes testing aspects of top-up injection and delivering beam to X-ray users for a few hours with fractional current stability of 10{sup {minus}3}. We expect to run several top-up operation shifts in Spring 1999. Issues of importance are orbit and emittance transients during the injection and scheduling of injection pulses for the convenience of users.

Emery, L.

1999-03-31T23:59:59.000Z

267

Proposal to upgrade the MIPP experiment  

SciTech Connect

The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

Isenhower, D.; Sadler, M.; Towell, R.; Watson, S.; /Abilene Christian U.; Peterson, R.J.; /Colorado U.; Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W.; /Fermilab; Gutbrod, H.; Peters, K.; /Darmstadt, GSI; Feldman, G.; /Harvard U.; Torun, Y.; /IIT, Chicago; Messier, M.D.; /Indiana U. /Iowa U. /Dubna, JINR /Kent State U. /Groningen, KVI /Michigan U. /St. Petersburg, INP /Purdue U. /South Carolina U. /Virginia U. /Wisconsin U., Madison

2006-09-01T23:59:59.000Z

268

Upgrades to Monteburns, version 3.0  

SciTech Connect

Monteburns, a Monte Carlo burnup code which has the flexibility to model time-dependent isotopic changes for a variety of nuclear systems by linking the neutron transport code MCNP/X to a production/depletion code, has undergone several performance upgrades recently that have increased the code's capabilities. Once limited to a specific number of regions, enhancements have been implemented that afford a much greater number of burn materials, such that users will be more limited by the physical constraints of their computing environment as opposed to inherent limits built into the coding of Monteburns. In conjunction with the increase in the number of burn materials, parallel execution of a production/depletion code of choice has been implemented, such that users have the option of using CINDER90, 0RIGEN2, or the newly released version of ORIGEN. Finally, the recoverable energy per fission calculation was upgraded to include capture gamma energy deposited in all specified materials as a function of irradiation time. The sum of the prompt and delayed recoverable energies from fission was obtained as before. These upgrades were first tested on a rigorous 1/8 core model of a Pressurized Water Reactor with fresh, once- and twice-burned fuel. We can now model several orders of magnitude more materials using Monte Carlo techniques, which is a significant advance in the reactor modeling world. (authors)

Galloway, J. D.; Trellue, H. R. [Los Alamos National Laboratory, 30 Bikini Atoll Rd., Los Alamos, NM 87545-0001 (United States)

2012-07-01T23:59:59.000Z

269

CDM Accreditation Panel CDM AP | Open Energy Information  

Open Energy Info (EERE)

CDM Accreditation Panel CDM AP CDM Accreditation Panel CDM AP Jump to: navigation, search Name CDM Accreditation Panel (CDM-AP) Place Bonn, Germany Zip 53153 Product The CDM accreditation panel (CDM-AP) prepares the decision making of the Executive Board in accordance with the procedure for accrediting operational entities. Coordinates 50.7323°, 7.101695° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.7323,"lon":7.101695,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

270

Artifacts of Life to be Studied at the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

Jeffrey T. Miller Wins Award for Excellence in Catalysis Jeffrey T. Miller Wins Award for Excellence in Catalysis van Veenendaal of X-ray Science Division wins 2009 NIU Presidential Research Professorship 2009 APSUO Compton Award to Grübel, Mochrie, and Sutton New Era of Research Begins as World's First Hard X-ray Laser Achieves "First Light" Unique Uranium Source in Naturally Bioreduced Sediment APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Artifacts of Life to be Studied at the APS JUNE 24, 2009 Bookmark and Share These "duck-billed" axe heads from the late Bronze Age (1500-1200 B.C.), found in the Levant, are among the items that will be studied at the APS. University of Southern California (USC) researchers traveling to the U.S.

271

APS Biomass I Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

APS Biomass I Biomass Facility APS Biomass I Biomass Facility Jump to: navigation, search Name APS Biomass I Biomass Facility Facility APS Biomass I Sector Biomass Location Arizona Coordinates 34.0489281°, -111.0937311° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.0489281,"lon":-111.0937311,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

272

APS User News-at-a-Glance, Issue 6  

NLE Websites -- All DOE Office Websites (Extended Search)

6; March 22, 2001 6; March 22, 2001 Contents: 1. Moncton to Lead Argonne's Fourth-Generation Sources Initiative April Shutdown Activities Web-based Graphics Gallery: Resource for Users New User Support Facility Opens One Month Left to Submit User Activity Reports 1. Moncton to Lead Argonne's Fourth-Generation Sources Initiative (Contact: rt@aps.anl.gov) In a memo last Friday to APS employees and the user community, David Moncton announced that he has accepted a position at Argonne National Laboratory as Senior Scientist and Advisor to the Laboratory Director. In this position, he will lead Argonne's Fourth-Generation Source initiative, advise the Laboratory Director on APS issues, and resume his x-ray research career. Consequently, he will be stepping aside as Associate Laboratory Director for the APS on May 1, 2001,

273

AP-XPS Measures MIEC Oxides in Action  

NLE Websites -- All DOE Office Websites (Extended Search)

AP-XPS Measures MIEC Oxides in AP-XPS Measures MIEC Oxides in Action AP-XPS Measures MIEC Oxides in Action Print Wednesday, 25 May 2011 00:00 Oxide materials with mixed ionic-electronic conductivity (MIEC) can conduct both electrons and oxygen ions. MIEC oxides have broad applications, including use in solid-oxide fuel cells, high-temperature electrolysis for synthetic fuel production, and oxygen-separating membranes for chemical processes or NOx-free combustion; however, their surface activity under reaction conditions has been difficult, if not impossible, to ascertain, until recently. A team from the University of Maryland and Sandia National Laboratories joined ALS scientists on Beamlines 9.3.2 and 11.0.2 to overcome the vacuum limitations of conventional XPS instruments using ambient-pressure x-ray photoelectron spectroscopy (AP-XPS), providing the first in situ measurements of local surface oxidation states and electric potential in active MIEC electrodes.

274

APS User News-at-a-Glance, Issue 35  

NLE Websites -- All DOE Office Websites (Extended Search)

5: November 22, 2005 5: November 22, 2005 Advanced Photon Source www.aps.anl.gov ============================================ CONTENTS 1. Message from Murray SCIENCE NEWS 2. Date Correction: Cross Cut Review on January 25 3. Science Highlight: "Demixing" of Metallic Liquids Seen for First Time 4. SRI-2005 Detector Workshop Moved to APS FACILITY NEWS 5. Shop and Machine Tool Users: Reauthorization Required by February 1, 2006 6. Pete Jemian Heads Beamline Controls and Data Acquisition Group 7. Nominations Packages Due Feb. 15 for 2006 APSUO Franklin Award 8. Reviews Scheduled for 10 Sectors 9. New Information Products from the APS 10. CV Check: Any New APS Papers? BRIEFLY NOTED ---Holiday Shutdowns Affect Services ---SPIE Scholarships and Career Guidance DATES AND DEADLINES

275

APS Guideline for CAT/XOR Sector Orientation  

NLE Websites -- All DOE Office Websites (Extended Search)

CAT/XSD Sector Orientation CAT/XSD Sector Orientation October 1, 1999 (Updated October 11, 2004) Introduction The orientation described in this guideline is designed to provide the basic information needed by new users to make safe and effective use of CAT/XSD’s facilities at the APS. The CAT/XSD will also give appropriate parts of this orientation to visitors who are not expected to do hands-on work in CAT/XSD's facilities. Contents of the Orientation Part 1: APS Requirements CAT/XSD will ensure that prospective visitors are aware that they must: Register with the APS User Office and receive an appropriate safety orientation upon arrival and Never enter a controlled area unescorted. CAT/XSD will inform prospective users that they must: Contact the APS User Office prior to arrival for guidance on

276

APS User Peter Crane Awarded the 2014 International Prize for...  

NLE Websites -- All DOE Office Websites (Extended Search)

APS User Peter Crane Awarded the 2014 International Prize for Biology from Japan Society for the Promotion of Science October 27, 2014 Bookmark and Share Peter Crane Peter Crane,...

277

Tune measurement in the APS ring  

SciTech Connect

The APS system will contain three rings. The first is a positron accumulator ring (PAR). Its function is to coalesce 24, 30-ns-long positron bunches into one 290-ps bunch. The second is the injector synchrotron (IS). It accelerates the 450-MeV positron bunches to 7 Gev for injection into the storage ring (SR). Betatron and synchrotron motion frequently occurs in circular machines, without any deliberate excitation. However, the amplitudes of this motion cannot be predicted. Therefore, it is desirable to have controlled ways to excite these modes. Two types of devices will be used to excite the beam. One will be a magnetic kicker or bumper. All rings already have these devices planned for the horizontal direction for injecting and extracting beams. Some of these magnets will be used for exiting horizontal betatron motion. In the storage ring, a special kicker will be installed to produce up to 1 mm amplitude motion in the vertical direction. Two 8.4-in striplines (SL) (1/4 wavelength at 352 MHz) will be installed on all rings. One stripline in each ring will be used to drive all three tunes, and the other stripline will be used as a pickup. In the PAR and IS, the pickup stripline will be in a dispersive region. This will allow observation of both betatron and synchrotron motions. In the SR, the stripline will be in a nondispersive region because it is not practical to install it in a dispersive region. To do synchrotron tune measurements in the SR, one of the button BPMs located in a dispersive region will be used. To minimize development effort, as much of the BPM system electronics as possible will be used in the tune measurement system. The BPM electronics uses the AMP/PM conversion technique. This system operates at 352 MHz. Thus, tune measurement components were also designed to operate at 352 MHz.

Sellyey, W.; Kahana, E.; Wang, X.

1993-07-01T23:59:59.000Z

278

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Innovative Technology Improves Upgrading Process for Unconventional Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology.

279

County Aims to Save with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County Aims to Save with Upgrades County Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

280

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Improves Upgrading Process for Unconventional Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Energy Efficiency Upgrades: Benefiting Homeowners and the Environment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades: Benefiting Homeowners and the Upgrades: Benefiting Homeowners and the Environment Energy Efficiency Upgrades: Benefiting Homeowners and the Environment May 10, 2013 - 4:37pm Addthis Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs Looking for ways to save energy? Learn how to do a DIY home energy audit to help you identify and prioritize some energy efficiency upgrades. Check out Energy Saver for tips and advice on ways to save energy and money. When Margie Garmey and her partner bought their newly constructed two-story

282

County Aims to Save with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aims to Save with Upgrades Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

283

Methods and apparatuses for preparing upgraded pyrolysis oil  

DOE Patents (OSTI)

Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

2013-10-01T23:59:59.000Z

284

List of Steam-system upgrades Incentives | Open Energy Information  

Open Energy Info (EERE)

upgrades Incentives upgrades Incentives Jump to: navigation, search The following contains the list of 100 Steam-system upgrades Incentives. CSV (rows 1 - 100) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active AlabamaSAVES Revolving Loan Program (Alabama) State Loan Program Alabama Commercial Industrial Institutional Building Insulation Doors Energy Mgmt. Systems/Building Controls Lighting Lighting Controls/Sensors Steam-system upgrades Water Heaters Windows Biodiesel Biomass CHP/Cogeneration Ethanol Fuel Cells using Renewable Fuels Geothermal Electric Hydroelectric energy Landfill Gas Photovoltaics Renewable Fuels Solar Water Heat Commercial Refrigeration Equipment Natural Gas Yes Ameren Missouri (Gas) - Business Energy Efficiency Program (Missouri) Utility Rebate Program Missouri Commercial

285

Employee-Focused Structure Helps Produce Upgrades for Contractor...  

Energy Savers (EERE)

Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work. "We all have a real...

286

Office of Energy Policy and Systems Analysis Site Upgrade  

Energy.gov (U.S. Department of Energy (DOE))

Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

287

EECBG Success Story: County Partners with Siemens on Energy Upgrades...  

Office of Environmental Management (EM)

Block Grant (EECBG) to develop projects including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the...

288

Community based outreach strategies in residential energy upgrade programs  

E-Print Network (OSTI)

Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

McEwen, Brendan (Brendan Carl Francis)

2012-01-01T23:59:59.000Z

289

Conversion Technologies for Advanced Biofuels ? Bio-Oil Upgrading  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of bio-oils. Focus on process development activities and underlying science for biofuels production. Bio-oil Upgrading - Presenter Information Energy Efficiency & Renewable...

290

THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES | Department...  

Energy Savers (EERE)

upgrades. RREA used a home energy makeover contest to educate homeowners and drive demand. RREA also engaged faith-based institutions and neighborhood associations in its...

291

New Science on the Horizon as Upgraded Particle Accelerator Meets...  

Office of Science (SC) Website

New Science on the Horizon as Upgraded Particle Accelerator Meets Commissioning Milestones Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP...

292

Jefferson Lab's upgraded Free-Electron Laser produces first ligh...  

NLE Websites -- All DOE Office Websites (Extended Search)

upgraded Free-Electron Laser produces first light June 18, 2003 Researchers at the U.S. Department of Energy's Thomas Jefferson National Accelerator Facility have produced first...

293

Upgrading of Pitch Produced by Mild Gasification of Subbituminous Cal  

Science Journals Connector (OSTI)

Upgrading of Pitch Produced by Mild Gasification of Subbituminous Cal ... Structural Characterization of Coal Tar Pitches Obtained by Heat Treatment under Different Conditions ...

Robert L. McCormick; Mahesh C. Jha

1994-03-01T23:59:59.000Z

294

EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

295

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...  

Energy Savers (EERE)

duct sealing; heating, ventilation, and air conditioning (HVAC) upgrades; sunscreens; and solar water heaters. Energize Phoenix eventually expanded its service area beyond the...

296

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study 11: Commercial Kitchen Equipment (Brochure), Federal Energy...

297

Ribbon cutting marks chemistry laboratory upgrades at Northern...  

NLE Websites -- All DOE Office Websites (Extended Search)

Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Your link to news and opportunities from Los Alamos National Laboratory...

298

Bedford Energizes Other Communities to Upgrade | Department of...  

Energy Savers (EERE)

program and completed energy efficiency upgrades in their own homes, the rate of project completion was more than double the average of that across all participating...

299

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

300

The value of steam turbine upgrades  

SciTech Connect

Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

Potter, K.; Olear, D.; [General Physics Corp. (United States)

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

Energy.gov (U.S. Department of Energy (DOE))

This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

302

ATLAS Tile Calorimeter Electronics and Future Upgrade  

E-Print Network (OSTI)

The Tile Calorimeter (TileCal) of the ATLAS experiment is the hadronic calorimeter designed for energy reconstruction of hadrons, jets, tau-particles and missing transverse energy. An overview of the on-detector and off-detector TileCal electronics used for ATLAS data taking is given. Upgrade plans for TileCal electronics for the High Luminosity LHC programme in 2024 are discussed, together with R&D activities at different laboratories that target different parts of the TileCal electronics. In particular, a demonstrator prototype for TileCal electronics to be installed during the long shutdown in 2014 is described.

Usai, G; The ATLAS collaboration

2014-01-01T23:59:59.000Z

303

MCNPX graphics and arithmetic tally upgrades  

SciTech Connect

The MCNPX MCPLOT package is the tool used to plot tallies and cross-sections. We report on an assortment of upgrades to MCPLOT that are intended to improve the appearance of two-dimensional tally and cross-section plots. We have also expanded the content and versatility of the MCPLOT 'help' command. Finally, we describe the initial phase of capability implementation to post-process tally data using arithmetic operations. These improvements will enable users to better display and manipulate simulation results.

Durkee, Joe W [Los Alamos National Laboratory; James, Michael R [Los Alamos National Laboratory; Waters, Laurie S [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

304

APS User News-at-a-Glance, Issue 27  

NLE Websites -- All DOE Office Websites (Extended Search)

8: October 18, 2004 8: October 18, 2004 1. Message from Murray 2. Cross-cut Review to Feature Science Requiring the Pulsed Structure of the Beam 3. New 13T Superconducting Magnet Tested at Sector 4 4. David Mao of HP-CAT Awarded Prize by Royal Swedish Academy of Sciences 5. General User Update: New Beamlines Added, Original Program Proposals Expiring 6. APS Gauging User Interest in Single-Crystal Diamond for Monochromators 7. Suggestions Please: Workshop Ideas Invited for Users Meeting 8: Briefly Noted Grill opens for lunch Partner User deadline is Oct. 29 Jeff Catalano wins Argonne fellowship Library offers electronic access to more journals 9. Administrative Dates and Deadlines 1. Message from Murray (Contact: Murray Gibson, jmgibson@aps.anl.gov) I want to thank the many users who were involved in the strategic planning meeting and scientific workshops which concluded in early September at Fontana, Wisconsin. Many attendees shared my impression that this process was an outstanding success. Altogether there were 320 attendees at the 9 workshops, and 160 attendees at the final 2-day strategic planning meeting. The nine workshops have provided the input we need to flesh out our scientific strategic plan for the APS for the next 5-10 years. The plan will focus on compelling opportunities to build new user communities and new instrumentation to increase the scientific impact of the APS. It is the flesh which substantiates Phases I and II of our 20-year plan, which was released last year (http://www.aps.anl.gov/aps/downloads/20030223-roadmap.pdf). The scientific strategic plan will be discussed by the APS Scientific Advisory Committee at its January 2005 meeting and will be made available for user comment before it is finalized.

305

ANL/APS/TB-5 Functional Description of APS Beamline Front Ends  

NLE Websites -- All DOE Office Websites (Extended Search)

Functional Description of APS Beamline Front Ends by Tuncer Kuzay February 1993 Advanced Photon Source & Argonne National Laboratory, Argonne, Illinois 60439 o operated by The University of Chicago for the United States Department of Energy under Contract W-31-1 09-Eng-38 Argonne National Laboratory, with facilties in the states of Ilinois and Idaho, is owned by the United States government, and operated by The University of Chicago under the provisions of a contract with the Deparment of Energy. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any waranty, express or implied, or assumes any legal liability or responsibility for the accuracy,

306

http://www.aps.anl.gov/aps/news/20030605b.html  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Fuels Engineering Interest Research Fuels Engineering Interest Award-winning research on the characteristics of fuel sprays from injectors is one of the featured articles in the May 2003 issue of Mechanical Engineering and on the Web site of that magazine. The studies, carried out at APS's X-ray Operation and Research beamline 1-BM and the Cornell High Energy Synchrotron Source, revealed startling new information about fuel sprays, including the presence of a shockwave as the spray leaves the injector nozzle. Entitled "Penetrating Vision," the article in Mechanical Engineering, by associate editor John DeGaspari, notes that "an investigative technique using x-rays is causing engine designers to sit up and take notice." In the article, Scott Parrish, General Motors R&D senior research engineer, notes that "Many applications that

307

The enhanced ASDEX Upgrade pellet centrifuge launcher  

SciTech Connect

Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

Plckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)] [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

2013-10-15T23:59:59.000Z

308

ATLAS Upgrade Instrumentation in the US  

E-Print Network (OSTI)

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leading role.

Gustaaf Brooijmans; Hal Evans; Abe Seiden

2013-07-22T23:59:59.000Z

309

ATLAS Upgrade Instrumentation in the US  

E-Print Network (OSTI)

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leadin...

Brooijmans, Gustaaf; Seiden, Abe

2013-01-01T23:59:59.000Z

310

CEBAF Upgrade: Cryomodule Performance And Lessons Learned  

SciTech Connect

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

2014-02-01T23:59:59.000Z

311

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

Energy.gov (U.S. Department of Energy (DOE))

This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

312

Secure upgrade of hardware security modules in bank networks  

Science Journals Connector (OSTI)

We study the secure upgrade of critical components in wide networked systems, focussing on the case study of PIN processing Hardware Security Modules (HSMs). These tamper-resistant devices, used by banks to securely transmit and verify the PIN typed ... Keywords: PIN processing, hardware security modules, security APIs, upgrade strategies

Riccardo Focardi; Flaminia L. Luccio

2010-03-01T23:59:59.000Z

313

Recent ASDEX Upgrade Research in Support of ITER and DEMO  

E-Print Network (OSTI)

Energy Conference, OV2/2, St. Petersburg, Russia, 13.10.2014 · ASDEX Upgrade: machine and programme allowed (?) Virtually no disruptions #12;ASDEX Upgrade has a powerful H&CD system Neutral Beam Injection;Stagnation of core density build-up due to fuelling limit (source shifts to SOL) High SOL density leads

314

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network (OSTI)

Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell PRINCETON PLASMA....~_____...L....,L....q..l:::::.......:.J Larry Dudek, NSTX Center Stack Manager Reviewed by: I( Jer evine, Environment, Safety, Health and S This document describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade

Princeton Plasma Physics Laboratory

315

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network (OSTI)

Draft 0 6/17/11 1 Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell: _____________________________________________________________ Jerry Levine, Environment, Safety, Health and Security Head Reviewed by describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work

Princeton Plasma Physics Laboratory

316

Properties of Upgraded Shengli Lignite and Its Behavior for Gasification  

Science Journals Connector (OSTI)

Low-rank coals (LRCs, i.e., brown coal and lignite) have an estimated proportion of 45% of the worlds coal reserves and constitute a significant resource for both energy and chemical feedstocks. ... (10)Figure 15 shows the calculating results of reactivity parameters (Rmax, Rave, and R) for SL lignite and different upgraded lignites obtained by isothermal upgrading. ...

Xianjun Yang; Cheng Zhang; Peng Tan; Tao Yang; Qingyan Fang; Gang Chen

2013-10-29T23:59:59.000Z

317

LHC accelerator R&D and upgrade scenarios  

Science Journals Connector (OSTI)

I report the results of a CERN task force set up to investigate a possible staged upgrade of the LHC and of its injectors, with a view...34 cm2 s1 to 1035 cm2 s1. Scenarios for an LHC energy upgrade by nearly...

F. Ruggiero

2004-07-01T23:59:59.000Z

318

Appointments Vacant  

Science Journals Connector (OSTI)

... grassland and other research-The Secretary, The Hannah Dairy Research Institute, Kirkhill, Ayr (December 26).

1953-12-19T23:59:59.000Z

319

Appointments Vacant  

Science Journals Connector (OSTI)

... North-East Essex Technical College and School of Art, Sheepen Road, Colchester, Essex (December 26).

1964-12-19T23:59:59.000Z

320

Researchers, Appointments  

E-Print Network (OSTI)

, Assistant Professor (ECE) Chandra Veer Singh, Assistant Professor (MSE) David Sinton, Associate Professor

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Appointments Vacant  

Science Journals Connector (OSTI)

... THE DEPARTMENT OF PHYSICS, to prepare and participate in experiments on the 7 GeV proton synchroton at the Rutherford High Energy Laboratory of the National Institute for Research in Nuclear Science ...

1962-08-18T23:59:59.000Z

322

Appointments Vacant  

Science Journals Connector (OSTI)

... OF THE PHYSICS DEPARTMENT to be engaged with experiments on NIMROD, the 7 GeV proton synchroton at the Rutherford Laboratory, and applicants should be prepared to spend a considerable part ...

1965-05-29T23:59:59.000Z

323

Appointments Vacant  

Science Journals Connector (OSTI)

... experimental work on the chemical and physical properties and the measurement of performance characteristics of pyrotechnic systems The Ministry of Labour and National Service, Technical and Scientific Register (K), ...

1955-02-05T23:59:59.000Z

324

Appointments Vacant  

Science Journals Connector (OSTI)

... metallography, electron microscopy or X-ray or electron diffraction techniques, for the determination of thermal and physical properties of metals and alloys ; (Ref. F.583/51/A) ... or PLANT PATHOLOGIST for the Research Division of the Ministry of Agriculture in the SudanThe Sudan Agent in London, Wellington House, Buckingham Gate, London, S.W.I, endorsed ...

1951-09-29T23:59:59.000Z

325

Appointments Vacant  

Science Journals Connector (OSTI)

... electrical engineering or physics, with good knowledge of electronic techniques) in the telecommunications and light electrical engineering fields, and ELECTRONIC ENGINEERS (Ref. TT/401) to design and construct ... Research, British Ceramic Research Association, Queens Road, Penkhull, Stoke-on-Trent.

1951-12-01T23:59:59.000Z

326

Unique Solar Thermal Laboratory Gets an Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This “power tower” is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories This "power tower" is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories Lorelei Laird Writer, Energy Empowers The National Solar Thermal Test Facility at Sandia National Laboratories is unique - and in demand. The Facility has been instrumental in NASA tests, national defense programs and concentrated solar technology development.

327

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Idaho National Engineering Laboratory Sewer System Upgrade 7: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho SUMMARY This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1994 EA-0907: Finding of No Significant Impact Idaho National Engineering Laboratory Sewer System Upgrade Project

328

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades Help Retired Military Officers Save Energy Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

329

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Efficiency Upgrades Help Retired Military Officers Save Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

330

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Efficiency Upgrades Help Build Better Neighborhoods Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

331

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

332

Andhra Pradesh Tribal Power Corporation AP TRIPCOR | Open Energy  

Open Energy Info (EERE)

Andhra Pradesh Tribal Power Corporation AP TRIPCOR Andhra Pradesh Tribal Power Corporation AP TRIPCOR Jump to: navigation, search Name Andhra Pradesh Tribal Power Corporation (AP TRIPCOR) Place Hyderabad, Andhra Pradesh, India Sector Hydro Product Hyderabad-based agency formed to set up micro hydro projects in tribal areas of Andhra Pradesh. Coordinates 17.6726°, 77.5971° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":17.6726,"lon":77.5971,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

333

AP-XPS Measures MIEC Oxides in Action  

NLE Websites -- All DOE Office Websites (Extended Search)

AP-XPS Measures MIEC Oxides in Action Print AP-XPS Measures MIEC Oxides in Action Print Oxide materials with mixed ionic-electronic conductivity (MIEC) can conduct both electrons and oxygen ions. MIEC oxides have broad applications, including use in solid-oxide fuel cells, high-temperature electrolysis for synthetic fuel production, and oxygen-separating membranes for chemical processes or NOx-free combustion; however, their surface activity under reaction conditions has been difficult, if not impossible, to ascertain, until recently. A team from the University of Maryland and Sandia National Laboratories joined ALS scientists on Beamlines 9.3.2 and 11.0.2 to overcome the vacuum limitations of conventional XPS instruments using ambient-pressure x-ray photoelectron spectroscopy (AP-XPS), providing the first in situ measurements of local surface oxidation states and electric potential in active MIEC electrodes.

334

APS - Renewable Energy Incentive Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APS - Renewable Energy Incentive Program APS - Renewable Energy Incentive Program APS - Renewable Energy Incentive Program < Back Eligibility Commercial Residential Savings Category Bioenergy Home Weatherization Commercial Weatherization Solar Lighting Windows, Doors, & Skylights Buying & Making Electricity Energy Sources Water Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Wind Maximum Rebate Residential systems: $50,000 or 50% of system costs, whichever is less Commercial systems: $75, 000 or 40% of system costs, whichever is less Program Info Funding Source RES Surchage State Arizona Program Type Utility Rebate Program Rebate Amount Residential and Small Commercial PV (up to 25 kW): $0.10/watt-DC Residential Solar Water Heating: $0.40/kWh-displaced

335

APS User News-at-a-Glance, Issue 17  

NLE Websites -- All DOE Office Websites (Extended Search)

7: October 30, 2002 7: October 30, 2002 Contents: 1. Workshop: Operating Modes--What Are the Tradeoffs? 2. Workshop: Beyond Undulator A--New Directions and New Needs for Insertion Devices 3. New on the Floor: APS Introduces Locator Cards 4. Reminder: General User Proposals Due Nov. 1 5. Reminder: Non-U.S. Citizens Need New Badges ___________________________________________________________ 1. Workshop: Operating Modes--What Are the Tradeoffs? (Contact: klaffky@aps.anl.gov) The move in FY2002 to top-up operation proved very successful for both the accelerator staff and users. To build on that experience, the APS is interested in talking with users about the best ways to use this and other possible operating modes to both accommodate the broad spectrum of user needs and permit continuous improvement of the facility. With this goal in

336

Microsoft PowerPoint - aps07_wukitch-1.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

APS-DPP Orlando, FL Nov 12-16, 2007 APS-DPP Orlando, FL Nov 12-16, 2007 1 ICRF Performance with Metallic Plasma Facing Components: Revenge of the Sheath Presented by S.J. Wukitch on behalf of Alcator C-Mod Team Outline: 1. Motivation and introduction to ICRF experiments. 2. Discuss RF impurity source identification results. 3. Present measurements of ICRF enhancement of plasma potential. Key Conclusions: 1. Important RF specific impurity sources are outside the divertor and linked to the active antenna. 2. ICRF enhanced sheaths had unexpected characteristics. 1. Scaling is dependent of confinement mode and wall conditions. 2. Observed residual modification of the plasma potential with insulating limiters. 49th APS-DPP Orlando, FL Nov 12-16, 2007 2 ICRF Role on ITER is to Heat the Plasma to Burning Condition

337

Linda Young of APS Elected Vice Chair of DAMOP  

NLE Websites -- All DOE Office Websites (Extended Search)

Moffat of BioCARS and U. of C. Receives 2011 ACA Patterson Award Moffat of BioCARS and U. of C. Receives 2011 ACA Patterson Award Argonne's Fenter Wins Warren Award for X-ray Diffraction Studies Lahsen Assoufid Elected a Fellow of SPIE 2011 Arthur H. Compton Award Announced by APSUO X-Ray Focusing: Techniques and Applications APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Linda Young of APS Elected Vice Chair of DAMOP JULY 14, 2011 Bookmark and Share Linda Young Argonne Distinguished Fellow and Argonne National Laboratory X-ray Science Division (XSD) Director Linda Young has been elected vice chair of the Division of Atomic, Molecular, and Optical Physics of the American Physical Society (DAMOP). The position became official at the 2011 DAMOP Meeting

338

APS User News-at-a-Glance, Issue 57  

NLE Websites -- All DOE Office Websites (Extended Search)

7, September 17, 2009 7, September 17, 2009 CONTENTS MESSAGE FROM MURRAY: New XSD Division Director Named SCIENCE NEWS 1. Science & Research Highlights Chemists Reach from the Molecular to the Real World with Creation of 3-D DNA Crystals Boron-based Compounds Trick a Biomedical Protein Cockroaches Advance Student's Study of Ancient Life 2. New MOU Signed for APS Collaborative Development Team USER MATTERS 3. XOR/XSD Visiting Scientist Program Offered 4. APS Beam Time Access System 5. Partner User Proposals Offer Options for Long-term Beam Time 6. Launch of Redesigned APS Beamline Directory FACILITY NEWS 7. Workshop: On-line Brillouin Spectroscopy at GSECARS, September 23-25, 2009 8. FiberNet/BioCAT Fiber Diffraction Workshop Coming This Fall 9. Beamline Scientist Position Offered

339

APS User News-at-a-Glance, Issue 34  

NLE Websites -- All DOE Office Websites (Extended Search)

4: September 26, 2005 4: September 26, 2005 Advanced Photon Source www.aps.anl.gov ============================================ CONTENTS 1. Message from Murray SCIENCE NEWS 2. DOE Supports Science and Technology Faculty, Students Affected by Katrina 3. Cheaper Silicon Found Effective for Solar Cells 4. Two APS Groups Awarded NIH Protein Structure Initiative Grants of More Than $100 Million 5. Argonne Supercomputing Resource Available to APS Users 6. Two from HP-CAT win Balzan Prize 7. Student User Meets Nobel Laureates FACILITY NEWS 8. Summer Schools Train 117 Students BRIEFLY NOTED ---"New user" scholarships available for SNS/HFIR users meeting ---Correction: Beamtime Allocation Committee meeting date ---New menu unwrapped at 401 Grill ---Construction affects access from west

340

APS - Multifamily Energy Efficiency Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APS - Multifamily Energy Efficiency Program APS - Multifamily Energy Efficiency Program APS - Multifamily Energy Efficiency Program < Back Eligibility Construction Multi-Family Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Other Appliances & Electronics Commercial Lighting Lighting Program Info State Arizona Program Type Utility Rebate Program Rebate Amount CFL Lighting in Dwellings: Free Energy Design Incentive: 50% of study cost, up to $5,000 Energy Assessments: Free T8 and T5 Fluorescents: $5-$12/unit Delamping: $5 - $10 LED Exit Signs/Traffic Signals: $25/unit LED Lamps: $10 - $15 LED Signage: $3/ln ft Refrigerated Case LED Lamps: $25 - $30 Occupancy Sensors: $0.12/connected watt Daylighting Controls: $0.30/connected watt

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

APS User News-at-a-Glance, Issue 20  

NLE Websites -- All DOE Office Websites (Extended Search)

20: April 8, 2003 20: April 8, 2003 Contents: 1. Message from Murray: The APS in 20 Years 2. Users Meeting Draws Near, So Register Now! 3. Compton Award Winners Announced 4. N/X School Holds "Reunion" Workshop--Posters and Talks Invited 5. "Nuclear Lighthouse Effect" Studies Win BESSY Prize 6. Partner Users: Letters of Intent Due June 1 7. Results of General User Program Announced for Summer Run 8. Publications Database: A Comprehensive Record--With Your Help 9. Access Delays Possible May 12-16 ___________________________________________________________ 1. Message from Murray: The APS in 20 Years (Contact: Murray Gibson, jmgibson@aps.anl.gov) First of all, it is my pleasure to congratulate the winners of the 2003 Compton Award: Martin Blume, L. Doon Gibbs, Denis McWhan, and Kazumichi

342

Challenge Met as APS Sends Final Chambers to LCLS  

NLE Websites -- All DOE Office Websites (Extended Search)

A Marriage of Hardware and Hard Work A Marriage of Hardware and Hard Work Shaken but Not Stirred 2008 Rosalind Franklin Young Investigator Award The 2008 3-Way Meeting In R&D, Super X-rays Mark Many Spots APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Challenge Met as APS Sends Final Chambers to LCLS MAY 21, 2008 Bookmark and Share The final five (of 40) extruded aluminum vacuum chambers for the Linac Coherent Light Source (LCLS) undulator system have been shipped from Argonne National Laboratory - where the chambers were designed and assembled - to the Stanford Linear Accelerator Center, where the LCLS "will be the world's first x-ray free electron laser when it becomes operational in 2009. Pulses of x-ray laser light from LCLS will be many

343

APS User News-at-a-Glance, Issue 23  

NLE Websites -- All DOE Office Websites (Extended Search)

6: July 6, 2004 6: July 6, 2004 1. Message from Murray 2. Research Highlight: Visualizing Ferroelectric Memory As It Fades 3. Construction Season in Chicago: Work Begins on CNM and LOM 437 4. Strategic Summer: Summary of July and August Workshops 5. The LCLS Experimental Program: Call for Letters of Intent 6. Briefly Noted (Proposal Deadline, Summaries of APS Research Available) 7. Administrative Dates and Deadlines 1. Message from Murray (Contact: Murray Gibson, jmgibson@aps.anl.gov) Workshops. The summer is ramping up with a series of exciting workshops on the “Future Scientific Directions for the APS,” culminating in a strategic planning meeting September 2nd and 3rd (read more in item 4). We hope that the momentum generated by this study will lead to development of

344

APS - Energy Efficiency Solutions for Business | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APS - Energy Efficiency Solutions for Business APS - Energy Efficiency Solutions for Business APS - Energy Efficiency Solutions for Business < Back Eligibility Commercial Industrial Institutional Local Government Retail Supplier Schools State Government Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Other Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Small Customers ( Large Customers (>100 kW monthly demand): $500,000 + 50% of incentive over $500K Express Solutions (Refrigeration/Lighting Measures): 90% of project cost Schools: $250,000 (Small); $600,000 (Large) Custom projects: Up to 75% of incremental cost Retro-commissioning: $0.09 per kWh saved up to 75% of incremental cost (up

345

APS User News-at-a-Glance, Issue 23  

NLE Websites -- All DOE Office Websites (Extended Search)

5: May 24, 2004 5: May 24, 2004 1. Message from Murray 2. APSUO Welcomes New Steering Committee Members and New Chair 3. 2004 Users Meeting: The Lowdown on the Hoedown (or, It Was a Really Good Meeting) 4. Strategic Summer: Future Directions Taking Shape at Science Workshops 5. APS Welcomes New General User Program Administrator, W. Elane Streets 6. General User Program Nearing Two Year Mark 7. APS Wins Starring Role in Docudrama 8. Briefly Noted (user viewpoint in print; crystallographic, geologic databases available through library) 9. Administrative Dates and Deadlines 1. Message from Murray (Contact: Murray Gibson, jmgibson@aps.anl.gov) The great success of our recent user meeting attests to the accomplishments of the users of the Advanced Photon Source, for which I thank you all.

346

AP-XPS Measures MIEC Oxides in Action  

NLE Websites -- All DOE Office Websites (Extended Search)

AP-XPS Measures MIEC Oxides in Action Print AP-XPS Measures MIEC Oxides in Action Print Oxide materials with mixed ionic-electronic conductivity (MIEC) can conduct both electrons and oxygen ions. MIEC oxides have broad applications, including use in solid-oxide fuel cells, high-temperature electrolysis for synthetic fuel production, and oxygen-separating membranes for chemical processes or NOx-free combustion; however, their surface activity under reaction conditions has been difficult, if not impossible, to ascertain, until recently. A team from the University of Maryland and Sandia National Laboratories joined ALS scientists on Beamlines 9.3.2 and 11.0.2 to overcome the vacuum limitations of conventional XPS instruments using ambient-pressure x-ray photoelectron spectroscopy (AP-XPS), providing the first in situ measurements of local surface oxidation states and electric potential in active MIEC electrodes.

347

Four Lawrence Livermore researchers named 2013 APS Fellows  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 For immediate release: 12/23/2013 | NR-13-12-06 Four Lawrence Livermore National Laboratory scientists have been selected as 2013 fellows of the American Physical Society (APS). They include, from left: Charles Cerjan, Ian Thompson, Eric Schwegler and Marilyn Schneider. Four Lawrence Livermore researchers named 2013 APS Fellows Breanna Bishop, LLNL, (925) 423-9802, bishop33@llnl.gov LIVERMORE, Calif. - Four Lawrence Livermore National Laboratory scientists have been selected as 2013 fellows of the American Physical Society (APS). Physicist Charles Cerjan was cited by the Division of Atomic, Molecular and Optical Physics for "seminal contributions to time-dependent Schrodinger equation propagation algorithms and their application to particle scattering and intense field dynamics, the development of laser-produced

348

AP-XPS Measures MIEC Oxides in Action  

NLE Websites -- All DOE Office Websites (Extended Search)

AP-XPS Measures MIEC Oxides in Action Print AP-XPS Measures MIEC Oxides in Action Print Oxide materials with mixed ionic-electronic conductivity (MIEC) can conduct both electrons and oxygen ions. MIEC oxides have broad applications, including use in solid-oxide fuel cells, high-temperature electrolysis for synthetic fuel production, and oxygen-separating membranes for chemical processes or NOx-free combustion; however, their surface activity under reaction conditions has been difficult, if not impossible, to ascertain, until recently. A team from the University of Maryland and Sandia National Laboratories joined ALS scientists on Beamlines 9.3.2 and 11.0.2 to overcome the vacuum limitations of conventional XPS instruments using ambient-pressure x-ray photoelectron spectroscopy (AP-XPS), providing the first in situ measurements of local surface oxidation states and electric potential in active MIEC electrodes.

349

APS User News-at-a-Glance, Issue 49  

NLE Websites -- All DOE Office Websites (Extended Search)

49, October 3, 2008 49, October 3, 2008 CONTENTS MESSAGE FROM MURRAY SCIENCE NEWS 1. Update on APS Renewal 2. Featured Beamline: GSECARS Beamline 13-BM-C Offers On-the-Fly Scanning with 200 Hz Imaging for X-ray Scattering in Geosciences 3. Science & Research Highlights USER MATTERS 4. Laser Safety 5. Ultrafast Special Interest Group 6. Fellowship Applications Due Oct. 6, Nov. 3 FACILITY NEWS 7. Search Committee Formed for X-ray Science Division Director at APS PEOPLE NEWS 8. Meet the Scientific Advisory Committee BRIEFLY NOTED --No Smoking Policy Reminder --Save the Date: Users Week 2009 --Synchrotron Environmental Science Conference ===================================================== Instructions for subscribing, unsubscribing, and submitting info http://www.aps.anl.gov/Users/Communications/User_News/

350

E-Print Network 3.0 - asdex upgrade edge Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

351

E-Print Network 3.0 - asdex upgrade h-mode Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

352

E-Print Network 3.0 - asdex upgrade team Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... Overview of ASDEX Upgrade Results - Development of integrated operating...

353

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade...

354

APS ALternative Fuel (Hydrogen) Pilot Plant Monitoring System  

NLE Websites -- All DOE Office Websites (Extended Search)

502 502 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Advanced Vehicle Testing Activity APS Alternative Fuel (Hydrogen) Pilot Plant Monitoring System Dimitri Hochard James Francfort July 2005 Idaho National Laboratory Operated by Battelle Energy Alliance INL/EXT-05-00502 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Advanced Vehicle Testing Activity APS Alternative Fuel (Hydrogen) Pilot Plant Monitoring System Dimitri Hochard a James Francfort b July 2005 Idaho National Laboratory Transportation Technology Department Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Assistant Secretary for Energy Efficiency and Renewable Energy Under DOE Idaho Operations Office

355

APS User News-at-a-Glance, Issue 23  

NLE Websites -- All DOE Office Websites (Extended Search)

4: March 12, 2004 4: March 12, 2004 1. Message from Murray: Next Steps in Strategic Plan 2. Destination APS: A Sampling of Student and Faculty Tours 3. Minutes of Scientific Advisory Committee Meeting Available 4. Proposals and Requests for Time Due March 17 5. Nominations Invited by March 15 for Rosalind Franklin Young Investigator Award 6. Ready, Set, Register! Users Meeting Web Site Is Live 7. User Office Welcomes Nena Moonier 8. Briefly Noted (opportunities for hands-on training and tours) 9. Administrative Dates and Deadlines ---------------------------------------------------------------------------------- Link directly to web version for quicker access to stories http://www.aps.anl.gov/user/news/news_24.html ----------------------------------------------------------------------------------

356

APS User News-at-a-Glance, Issue 36  

NLE Websites -- All DOE Office Websites (Extended Search)

6: February 28, 2006 6: February 28, 2006 Advanced Photon Source www.aps.anl.gov ============================================ CONTENTS 1. Message from Murray SCIENCE NEWS 2. Featured Beamline: Crystal-handling Robot Earns Loyal Following at 17-ID 3. Science Headlines: A Strange, New Fluid-like State of Matter; Molecular Structure of a Key Viral Protein FACILITY NEWS 4. Proposals Due March 10 5. Summer Schedule Published 6. Scientific Advisory Committee Considers New Proposals, Welcomes New Members 7. Users Meeting Registration Open, Abstract Deadline March 15 8. Directory of APS Scientific Contacts Now Available BRIEFLY NOTED ---Meeting notice: Synchrotron radiation in materials science ---Meeting notice: Users Meeting adjunct workshops DATES AND DEADLINES ----------------------------------------------------------------------------------------------

357

Categorical Exclusion 4598: Security Upgrade Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination Form Determination Form Proposed Action Title: Security Upgrade Project (4598) Program or Field Office~ Y·12 Site Office LocationCs) CCjty/County/State): Oak Ridge. Anderson County, Tennessee Proposed Action Description: PAGE 04 / 04 r~:·:~~s ·'-u ~'irllO:.'~~b ., .. y " ~e ··· ., ;:;;,il ,;: ; I·;;;:;;,; ;I ,' .: :~~. ,U,Illll\;: , "':ll ,l3~ . ~~~~ 1 ~; The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area. Cat.eg,orieal Exc!usion(s) ,Mp!i.cd: 81.3- Routine maintenance

358

Upgrading the TFTR Transrex Power Supplies  

SciTech Connect

In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

2009-05-29T23:59:59.000Z

359

LCLS LLRF Upgrades to the SLAC Linac  

SciTech Connect

The Linac Coherent Light Source (LCLS) at SLAC will be the brightest X-ray laser in the world when it comes on line. In order to achieve the brightness a 200fS length electron bunch is passed through an undulator. To create the 200fS, 3kA bunch, a 10pS electron bunch, created from a photo cathode in an RF gun, is run off crest on the RF to set up a position to energy correlation. The bunch is then compressed by chicanes. The stability of the RF system is critical in setting up the position to energy correlation. Specifications derived from simulations require the RF system to be stable to below 200fS in several critical injector stations and the last kilometer of linac. The SLAC linac RF system is being upgraded to meet these requirements.

Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Hong, B.; Kotturi, K.; Krejcik, P.; Wu, J.; /SLAC; Byrd, J.; /LBL, Berkeley

2007-10-04T23:59:59.000Z

360

Steam turbine upgrading: low-hanging fruit  

SciTech Connect

The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

Peltier, R.

2006-04-15T23:59:59.000Z

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

RANDALL STOUT, FAIA, RAIC, AAA, LEED AP, NCARB, CCIDC  

E-Print Network (OSTI)

RANDALL STOUT, FAIA, RAIC, AAA, LEED ® AP, NCARB, CCIDC Curriculum Vitae Randall Stout, FAIA responsibility, Stout is a LEED accredited architect whose sustainable strategies are an integral part of his level of project innovation and productivity. RSA has completed projects in the U.S., Canada and Europe

Hemmers, Oliver

362

APS/123-QED Dust Successive Generations in Complex Plasmas  

E-Print Network (OSTI)

distribution at the entrance of the plasma zone. It is connected to a 13.56 MHz rf gener- ator throughAPS/123-QED Dust Successive Generations in Complex Plasmas: A Cyclic Phenomenon in the Void Region´eans cedex 2, France (Dated: December 5, 2007) Dust formation and growth in plasmas are in most cases

Boyer, Edmond

363

C-A/AP/#245 Electron gun for RHIC EBIS  

E-Print Network (OSTI)

C-A/AP/#245 July 2006 Electron gun for RHIC EBIS Alexander Pikin Collider-Accelerator Department Brookhaven National Laboratory Upton, NY 11973 #12;Electron gun for RHIC EBIS Alexander Pikin 1. Introduction The method of forming the electron beam in a new gun for RHIC EBIS is the same as is being used for a Test

364

Eur. Phys. J. AP 14, 8796 (2001) THE EUROPEAN  

E-Print Network (OSTI)

Eur. Phys. J. AP 14, 87­96 (2001) THE EUROPEAN PHYSICAL JOURNAL APPLIED PHYSICS c EDP Sciences 2001.J. Coxa , G. Bradley, and D. Weaire Department of Physics, Trinity College, Dublin 2, Ireland Received: 20 to solidification, using an elemen- tary model for computation. The present analysis is one-dimensional: physically

Cox, Simon

365

Ad Hoc Positioning System (APS) Dragos Niculescu and Badri Nath  

E-Print Network (OSTI)

Ad Hoc Positioning System (APS) Dragos Niculescu and Badri Nath Computer Science Department Rutgers University Piscataway, NJ 08855 Abstract--Many ad hoc network protocols and applications assume the knowledge the aid of GPS in each node of an ad hoc network is im- portant in cases where GPS is either

Ha, Dong S.

366

Study of CMOS APS Responsivity Enhancement: Ring-Shaped Photodiode  

E-Print Network (OSTI)

Study of CMOS APS Responsivity Enhancement: Ring-Shaped Photodiode Tatiana Danov, Igor Shcherback obtained from various ring-shaped pixel photodiodes with different inner radius, implemented in a standard illumination. We show that the photodiodes with a small ring-opening exhibit better sensitivity in the blue

367

Superconducting RF Lab Facility Upgrades at Los Alamos  

SciTech Connect

Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

Katonak, D.J.; Rusnak, B.

1999-03-01T23:59:59.000Z

368

Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons  

DOE Patents (OSTI)

A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

Gordon, John Howard

2014-09-09T23:59:59.000Z

369

SolidLiquidVapor Equilibrium Models for Cryogenic Biogas Upgrading  

Science Journals Connector (OSTI)

In cryogenic upgrading processes involving dry ice formation, accurate predictions of solidliquid, solidvapor, and solidliquidvapor equilibria are fundamental for a correct design of the heat exchanger surface in order to achieve the desired biomethane purity. ... Moreover, the liquefied biogas production process, particularly interesting for cryogenic upgrading processes due to the low temperature of the obtained biomethane, requires an accurate knowledge of carbon dioxide solubility in liquid methane to avoid solid deposition. ... For some applications demanding a high energy content gas, namely vehicle fuels and injection in the natural gas grid, the biogas has to be upgraded into biomethane. ...

Mauro Riva; Marco Campestrini; Joseph Toubassy; Denis Clodic; Paolo Stringari

2014-10-13T23:59:59.000Z

370

Audit Report: AP-B-95-02 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report: AP-B-95-02 July 31, 1995 Audit of Selected Aspects of the Unclassified Computer Security Program at a DOE Headquarters Computing Facility Audit Report: AP-B-95-02...

371

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades  

Energy.gov (U.S. Department of Energy (DOE))

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

372

Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions  

Energy.gov (U.S. Department of Energy (DOE))

Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions

373

Find Financing for Energy Efficiency Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Photo of a block in lower downtown Denver that is part of Living City Block, a DOE Commercial Building Partnerships participant. Financing need not be a barrier to improving energy efficiency in your commercial building. There are federal, state, and local and tax incentives for energy efficiency upgrades, and other financial opportunities to help you meet your energy goals. The U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy, for example, offers financial assistance opportunities to business, industry, universities, and others for the development and demonstration of energy efficiency strategies and technologies. Other methods of financing energy efficiency improvements

374

SRS upgrades helium recovery system | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

upgrades helium recovery system | National Nuclear Security upgrades helium recovery system | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > SRS upgrades helium recovery system SRS upgrades helium recovery system Posted By Office of Public Affairs Savannah River Site (SRS) Tritium Programs recently completed a project to design, build and relocate a new system for separating and capturing

375

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

376

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

377

Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Case Study - Energy Efficiency Upgrades for Fermilab Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure October 7, 2013 - 3:29pm Addthis Utility energy service contracting provides needed plant improvements. Photo of Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Overview The U.S. Department of Energy's (DOE's) Fermi National Accelerator Laboratory (Fermilab) has replaced old equipment and reduced energy consumption through a partnership with its electric utility, Commonwealth Edison. Fermilab upgraded the centralized cooling system and separated the system into two segments - a "comfort system" to cool the employee office

378

Energy Efficiency Upgrades Part of Winning Formula for Oregon School  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades Part of Winning Formula for Oregon Upgrades Part of Winning Formula for Oregon School District Energy Efficiency Upgrades Part of Winning Formula for Oregon School District August 27, 2012 - 9:45am Addthis The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. Todd G. Allen Project Officer, Golden Field Office What are the key facts? Energy efficiency upgrades will reduce the Vernonia school district's energy usage by 43 percent and save taxpayers more than $62,000 a year. The school will also serve as a laboratory for forest technologies

379

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

380

NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC's Franklin NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability July 20, 2009 OCEAN EDDIES: This image comes from a computer simulation modeling eddies in the ocean. An interesting feature is the abundance of eddies away from the equator, which is shown in the center of the image at y=0. This research collaboration led by Paola Cessi of the Scripps Institute of Oceanography performed over 15,000 years worth of deep ocean circulation simulations with 1.6 million processor core hours on the upgraded Franklin system. The Department of Energy's (DOE) National Energy Research Scientific Computing (NERSC) Center has officially accepted a series of upgrades to its Cray XT4 supercomputer, providing the facility's 3,000 users with twice

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Lowell, Massachusetts, Preserves Historic Home Through Energy Upgrades  

Energy.gov (U.S. Department of Energy (DOE))

Artist James MacNeil Whistler's birthplace home in Lowell, Massachusetts, was built in 1823 and now houses the Lowell Art Association. The house was in need of a series of upgrades that improved energy efficiency while catering to the specific needs of a historic home and museum. Through the BetterBuildings Lowell Energy Upgrade program, the historic house will receive upgrades that include a high-velocity, small-duct HVAC system, updated storm windows, and attic insulation. These upgrades will reduce humidity in order to preserve the artwork displayed, and catch up to modern electrical demand without sacrificing the home's historic characteristicsall while providing energy savings of more than 30%. To learn more about how the project was financed and further details on the innovative HVAC equipment, read the original post from Lowell's Office of the Mayor's blog.

382

Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading  

Energy.gov (U.S. Department of Energy (DOE))

Algal lipid upgrading is one of eight priority pathways chosen to convert biomass into hydrocarbon fuels by the Bioenergy Technologies Office. These pathways were down-selected from an initial list of 18.

383

Financing Energy Upgrades for K-12 School Districts  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

384

CHICAGO HOUSE PARTIES SHOW WAYS TO UPGRADE | Department of Energy  

Energy Savers (EERE)

created Energy Impact Illinois (EI2) to promote home energy upgrades in single-family homes, multifamily housing units, and commercial buildings to help the region meet its 2008...

385

EECBG Success Story: Michigan County's Energy Upgrades Back on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the 'middle of the mitten,' is using over 300,000 in Recovery Act funds to perform ene Michigan County's Energy Upgrades Back on Track EECBG Success Story: The Jury's In:...

386

Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems  

E-Print Network (OSTI)

in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return...

Ertle, J. M.

387

Energy Upgrade California Drives Demand From Behind the Wheel  

Energy.gov (U.S. Department of Energy (DOE))

With a goal of "energy efficiency or bust," theCalifornia Center for Sustainable Energy (CCSE) recently completed a statewide tour of its ongoing Energy Upgrade California Roadshow. The mobile...

388

Capturing Energy Efficiency Upgrades in the Real Estate Transaction  

Energy.gov (U.S. Department of Energy (DOE))

"Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a homes energy consumption.

389

Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...  

Office of Environmental Management (EM)

adding insulation and motion sensors. As a result of the upgrades, the Tribe's electrical energy consumption is estimated to be reduced by 30%, thereby reducing the cost to operate...

390

BEST OFFER EVER ACCELERATED TEXAS UPGRADES | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Reported Data Data Dashboard Stories & Case Studies "Homeowners Go Deeper in the Heart of Texas and Save With Austin Energy" Best Offer Ever Produces Upgrades in Record Time...

391

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities  

Energy.gov (U.S. Department of Energy (DOE))

Case study details the Exchange (formerly the Army and Air Force Exchange Service), which took a leadership role in kitchen appliance upgrades to improve water efficiency by integrating water efficiency concepts into the organization's overall sustainability plan and objectives.

392

J.R. Simplot: Burner Upgrade Project Improves Performance and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company saved energy and money by increasing the efficiency of the steam system in its potato processing plant in Caldwell, Idaho. J.R. Simplot: Burner Upgrade Project Improves...

393

EECBG Success Story: Energy Upgrades to Save Small Arizona Town...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Related Articles An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Energy Upgrades to Save Small Arizona Town...

394

Annual Diversity Report 2009 -appendix 1 Section 9: Workforce Planning Statistics: New Appointments between 01/10/07-30/09/08  

E-Print Network (OSTI)

Annual Diversity Report 2009 - appendix 1 Section 9: Workforce Planning Statistics: New Appointments between 01/10/07-30/09/08 Table 9.1 Workforce Planning Statistics: Ethnicity by Faculty 9.2 Workforce Planning Statistics: Disability by Faculty and Professional Service: New Appointments

Anderson, Jim

395

Full-Time, Non-Tenure-Track, Non-Clinical Faculty Appointments The purpose of this document is to bring to your attention the policies and practices  

E-Print Network (OSTI)

Full-Time, Non-Tenure-Track, Non-Clinical Faculty Appointments The purpose of this document is to bring to your attention the policies and practices governing full-time, Non-tenure-track, Non-time annual contracts for an unlimited number of years. In addition, initial appointments of non- tenure-track

396

Screening of processing and upgrading schemes  

SciTech Connect

The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

397

Optical Link ASICs for the LHC Upgrade  

E-Print Network (OSTI)

We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

2009-11-23T23:59:59.000Z

398

Recent BES results and the BESIII upgrade  

E-Print Network (OSTI)

Using 58 million $J/\\psi$ and 14 million $\\psi(2S)$ events collected by the BESII detector at the BEPC, branching fractions or upper limits for the decays $J/\\psi$ and $\\psi(2S) \\to \\Lambda \\bar{\\Lambda} \\pi^0$ and $\\Lambda \\bar{\\Lambda} \\eta$ are measured, and the decays of $J/\\psi$ and $\\psi(2S)$ to $n K^0_S \\bar{\\Lambda}+c.c.$ are observed and measured for the first time. Finally, $R$ measurement data taken with the BESII detector at center-of-mass energies between 3.7 and 5.0 GeV are fitted to determine resonance parameters of the high mass charmonium states, $\\psi(3770)$, $\\psi(4040)$, $\\psi(4160)$, and $\\psi(4415)$. The Beijing Electron Collider is being upgraded to a two-ring collider (BEPCII) with a design luminosity of $1 \\times 10^{33}$cm$^{-2}$ s$^{-1}$ at 3.89 GeV and will operate between 2 and 4.2 GeV in the center of mass. With this luminosity, the new BESIII detector will beable to collect, for example, 10 billion $J/\\psi$ events in one year of running. BEPCII and BESIII are currently nearing completion, and commissioning of both is expected to begin in mid-2008.

Frederick A. Harris

2007-12-17T23:59:59.000Z

399

Characteristics of Fault-Tolerant Photodiode and Photogate Active Pixel Sensor (APS)  

E-Print Network (OSTI)

Characteristics of Fault-Tolerant Photodiode and Photogate Active Pixel Sensor (APS) Michelle L. La tolerant APS design has been implemented in a 0.18µm CMOS process for both a photodiode based and photogate of 2.03 (stuck low) and 1.89 (stuck high) for the photodiode based APS, and 1.73 (stuck low) and 1

Chapman, Glenn H.

400

Status of the SPIRAL I upgrade at GANIL  

SciTech Connect

The upgrade of the ''Systeme de Production d'Ions Radioactifs en Ligne'' phase I (SPIRAL I) installed at the ''Grand Accelerateur National d'Ions Lourds'' (GANIL) situated at Caen, France, is in progress and should be ready by 2014. In parallel, the first part of SPIRAL II facility is currently under construction. The global status of the upgrade is presented: goal, radioactive ion production systems, modification of the production cave and impact of the current safety re-evaluation of GANIL.

Jardin, P.; Bajeat, O.; Delahaye, P.; Dubois, M.; Feierstein, C.; Pellemoine, F.; Lecomte, P.; Leherissier, P.; Maunoury, L.; Saint-Laurent, M. G.; Traykov, E. [GANIL, Grand Accelerateur National d'Ions Lourds, CEA-DSM/CNRS-IN2P3, Blvd. H. Becquerel, BP 55027 14076 Caen Cedex 5 (France); Couratin, C. [LPC, Laboratoire de Physique Corpusculaire, CNRS-IN2P3/Universite de Caen Basse-Normandie/ENSICaen, Blvd. Marechal Juin, 14050 Caen Cedex (France)

2012-02-15T23:59:59.000Z

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

J2 dependents who want to apply for an Employment Authorization Document (EAD) must schedule an appointment with the IPS Immigration Advisor (906.487.2160). Please bring this checklist and  

E-Print Network (OSTI)

an appointment with the IPS Immigration Advisor (906.487.2160). Please bring this checklist and all documents noted below to the Advisor at the time of the appointment. We also request that you bring photocopies

402

Appointed BrOadcast (ABO): Reducing Routing Overhead in IEEE 802.11 Mobile Ad Hoc Networks  

E-Print Network (OSTI)

1 Appointed BrOadcast (ABO): Reducing Routing Overhead in IEEE 802.11 Mobile Ad Hoc Networks Chun-enhanced and standard IEEE 802.11 nodes can coexist in a MANET is also discussed. Keywords: mobile ad hoc network, promiscuous mode, broadcast, IEEE 802.11, routing. #12;2 1. Introduction In mobile ad hoc networks (MANETs

Chen, Sheng-Wei

403

PUBLIC ADVISER DUTY STATEMENT The California Energy Commission shall nominate and the Governor shall appoint for a term of three  

E-Print Network (OSTI)

PUBLIC ADVISER DUTY STATEMENT The California Energy Commission shall nominate and the Governor shall appoint for a term of three years a public adviser to the Commission who shall be an attorney and the public at large is secured in the planning, site and facility certification, energy conservation

404

Karen I. Winey is Professor of Materials Science and Engineering at the University of Pennsylvania with a secondary appointment in  

E-Print Network (OSTI)

Karen I. Winey is Professor of Materials Science and Engineering at the University of Pennsylvania with a secondary appointment in Chemical and Biomolecular Engineering. She is also Penn's Director include both polymer nanocomposites and ion-containing polymers. In nanocomposites, she designs

405

Directions to the APS User Office | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Directions to the APS User Office Directions to the APS User Office New users must go directly to the User Office when they arrive for their first visit. Current users who have any change in affiliation, visa status, etc., should also check in with the User Office to update their files. From the Argonne Main Gate: Ask for a map at the Main Gate or the Argonne Information Center when you arrive. Follow the signs to the Argonne Guest House. From the Guest House, Building 401 is visible about 0.3 miles (0.5 km) to the southeast. Enter Building 401 by the main steps. In the atrium of Building 401, turn to the left and look for the signs directing you to the User Office (on the first floor). Hours The User Office is open 8:30 a.m. to 5:00 p.m. Monday-Friday (other times by arrangement in exceptional circumstances).

406

Two from APS Receive U. of C. Distinguished Performance Award  

NLE Websites -- All DOE Office Websites (Extended Search)

Two from APS Receive U. of C. Distinguished Performance Award Two from APS Receive U. of C. Distinguished Performance Award Wah-Keat Lee and Jin Wang (both ANL-XFD) are among five scientists from the U.S. Department of Energy's Argonne National Laboratory who have received the 2005 University of Chicago Board of Governors for Argonne Distinguished Performance Award, which recognizes outstanding scientific or technical achievements or a distinguished record of achievements. Wang and Lee are being honored for their success in using X-rays in a wide range of research. Wang is a world-renowned expert in the application of X-ray scattering to a variety of materials science problems. He is best known for his research into the dynamics of fuel sprays, where he applied an innovative research approach and achieved unique results. Lee, after

407

APS Guideline for Hand Tool and Portable Power Tool Usage  

NLE Websites -- All DOE Office Websites (Extended Search)

Hand Tool and Portable Power Tool Usage Hand Tool and Portable Power Tool Usage Introduction CAT/XSD recognizes that the misuse and improper maintenance of hand tools and portable power tools cause a significant number of injuries to even "experienced" workers. Consequently, CAT/XSD has adopted the following policies and procedures to minimize the hazards associated with the use of such equipment at the APS. These guidelines apply to all use of hand tools and portable power tools by CAT/XSD personnel while performing maintenance or installation activities at the APS. Although CAT/XSD feels that most of the guidelines also apply to tool usage during experimental activities, CAT/XSD will not require that short-term users complete the training described below. Using Tools Safely If you have not had formal training in the use of common tools, either view

408

APS User News-at-a-Glance, Issue 43  

NLE Websites -- All DOE Office Websites (Extended Search)

3: June 27, 2007 3: June 27, 2007 Advanced Photon Source, Argonne National Laboratory www.aps.anl.gov ============================================ CONTENTS MESSAGE FROM MURRAY SCIENCE NEWS 1. Research Highlights & Annual Report 2. Featured Beamline: Powder Diffraction Beamline 11-BM to Offer High-Throughput, Mail-in Service 3. DOE Supercomputing "User Facilities" Seek Proposals by August 8 USER MATTERS 4. Users Week Draws Record Crowd 5. New Steering Committee Members Elected 6. General User Program Continues to Grow 7. Score Improvement on Proposals: Policy Confirmed 8. Foreign Nationals: Don't Get Stuck Staying Off Site FACILITY NEWS 9. Electrical Safety Reminder: Get Assistance with Electrical Problems! 10. Floor Coordinator Hours Have Changed PEOPLE NEWS -- Julie Olmsted Cross Joins APS as User Technical Interface

409

APS 7-BM Beamline: X-Ray Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Useful Websites Useful Websites X-Ray Interactions with Matter from CRXO at LBNL. Intuitive interface for x-ray transmission and reflectivity for a wide range of materials. X-Ray Data Booklet from LBNL. Slightly outdated in places, but many useful tables of edge energies, fluorescence lines, and crystal lattice spacings. NIST XCOM Database. Powerful database of photoelectric absorption, elastic scattering, and Compton scattering cross-sections for a wide range of materials. X-Ray Server. Maintained by Sergey Stepanov at GMCA at the APS, this website has several powerful calculators for simulating x-ray reflection and diffraction. Software X-Ray Oriented Programs (XOP). This program, written by scientists at the ESRF and APS, is widely used in the synchrotron research community.

410

APS Policy and Procedure for the Management of Chemicals  

NLE Websites -- All DOE Office Websites (Extended Search)

APS Policy and Procedure for the Management of Chemicals Introduction This document describes the policies and practices that CAT/XSD will follow to reduce accidents and control adverse effects that may result from the use of hazardous substances in CAT/XSD’s facilities at the APS. This guideline applies to all chemicals used for CAT/XSD’s installation and maintenance activities and to all chemical reagents used for laboratory purposes. Experimental samples are included only to the extent specified below. While this guideline does provide policies and general guidance, it may not include all precautions that are needed for the safe conduct of certain operations. CAT/XSD has developed other guidelines that define how hazard controls for individual operations will be determined and implemented. In

411

ANL/APS/TB-3 Undulator A Characteristics and Specifications  

NLE Websites -- All DOE Office Websites (Extended Search)

ANL/APS/TB-3 ANL/APS/TB-3 Undulator A Characteristics and Specifications by B. Lai, A. Khounsary,R. Savoy, L. Moog, and E. Gluskin February 1993 Advanced Photon Source . & Argonne National Laboratory, Argonne, Illinois 60439 o operated by The University of Chicago for the United States Department of Energy under Contract W-31-1 09-Eng-38 '"~ Argonne National Laboratory, with facilties in the states of Ilinois and Idaho, is owned by the United States government, and operated by The University of Chicago under the provisions of a contract with the Department of Energy. . DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any waranty, express

412

APS User News-at-a-Glance, Issue 29  

NLE Websites -- All DOE Office Websites (Extended Search)

29: January 24, 2005 29: January 24, 2005 APS Community Mourns Howard Birnbaum, Long-time Friend and Advisor Message from Murray : Scientific Strategic Plan Nearing Completion Cross-cut review on January 26: Science requiring the pulsed structure of the APS x-ray beam Research highlight: In situ kinetics study reveals a key to consistent self-assembly of nanocrystal superlattices Users Meeting May 2-6 celebrates anniversary, beginning Mail-in crystallography program introduced for general users General User update: More beamlines, extra beam time, next deadline Users invited to support accelerator research through American Physical Society People news: New leadership in accelerator operations, x-ray microscopy, and ESH/QA; Joanne Day retiring in March Administrative dates and deadlines

413

APS User Newse 2011 Year-End Index  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 APS User News Year-End Index 2011 Issue 67 (02.10.11) DIRECTOR'S CORNER SCIENCE NEWS 1. Science Highlights USER MATTERS 2. Reminder! Compton Award Nominations Sought! Deadline February 15 3. Seeking Nominees for the APSUO Steering Committee-Deadline March 31 4. X-ray App for I-Phone, I-Touch, I-Pad FACILITY NEWS 5. 2011 APS/CNM/EMC Users Meeting: HIGHLIGHT, PROMOTE, STIMULATE USER SCIENCE 6. In Memoriam: Bob Batterman AWARDS AND HONORS 7. Lahsen Assoufid Named Fellow of the Optical Society 8. George Srajer and Jin Wang Elected Fellows of the American Physical Society BRIEFLY NOTED -- 2011 American Association for the Advancement of Science Annual Meeting, February 17-21, 2011 -- 13th National School on Neutron and X-ray Scattering: Application

414

APS User News-at-a-Glance, Issue 13  

NLE Websites -- All DOE Office Websites (Extended Search)

3; March 19, 2002 3; March 19, 2002 Contents: 1. GM/CA-CAT Signs MOU Message from Murray Gibson: APS Colloquium Returns Research Highlight: X-rays Image Shock Waves from Fuel Spray Applications Available for the Fourth National Neutron and X-ray Scattering School User Activity Report Call User Badge and Training Information APSUO Corner: Check the Employment Bulletin Board 8. Operations Update 1. GM/CA-CAT Signs MOU (Contact: smithj@purdue.edu ) On March 18, Murray Gibson, Associate Laboratory Director for the APS, and Janet Smith, GM/CA-CAT Director, jointly signed a Memorandum of Understanding (MOU) with the Director of Argonne National Laboratory Director, Hermann Grunder; the Director of the National Institute of General Medical Sciences, Marvin Cassman; and the Director of the National

415

AP-4-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download AP-4-B Rate Schedule More Documents & Publications

416

APS User News-at-a-Glance, Issue 15  

NLE Websites -- All DOE Office Websites (Extended Search)

6; September 6, 2002 6; September 6, 2002 Contents: 1. Message from Murray: Updates on User Issues Task Force Reports APS Forms Scientific Advisory Committee NE-CAT and LS-CATs sign MOUs School on Neutron and X-ray Scattering: Great Success! New Staff to Support Users Operations Update 1. Message from Murray: Update on User Issues (Contact: jmgibson@aps.anl.gov) On August 2, representatives from the four U.S. Department of Energy/Basic Energy Sciences (DOE/BES) light sources met in Washington with DOE/BES officials to discuss several mandated operational changes, all of which are directed toward greater user accessibility and greater accountability by the facilities. The four light source directors were asked to develop a joint 10-year vision statement for facility development. In addition, they

417

Status of APS 1-Mwe Parabolic Trough Project  

SciTech Connect

Arizona Public Service (APS) is currently installing new power facilities to generate a portion of its electricity from solar resources that will satisfy its obligation under the Arizona Environmental Portfolio Standard (EPS). During FY04, APS began construction on a 1-MWe parabolic trough concentrating solar power plant. This plant represents the first parabolic trough plant to begin construction since 1991. Site preparation and construction activities continued throughout much of FY05, and startup activities are planned for Fall 2005 (with completion early in FY06). The plant will be the first commercial deployment of the Solargenix parabolic trough collector technology developed under contract to the National Renewable Energy Laboratory. The plant will use an organic Rankine cycle (ORC) power plant, provided by Ormat. The ORC power plant is much simpler than the conventional steam Rankine cycle plant and allows unattended operation of the facility.

Canada, S.; Brosseau, D.; Kolb, G.; Moore, L.; Cable, R.; Price, H.

2005-11-01T23:59:59.000Z

418

Web System Upgrading with Transaction Failure and Strategic This paper considers pricing and web system upgrading problems for an online retailer  

E-Print Network (OSTI)

1 Web System Upgrading with Transaction Failure and Strategic Customers Abstract: This paper considers pricing and web system upgrading problems for an online retailer facing a group of strategic period and identify the optimal policy for web system upgrading: there exists a threshold for each period

Xie, Jinxing

419

Molecular Basis for Enhancement of the Meiotic DMCI Recombinase by RAD51AP1  

SciTech Connect

Homologous recombination is needed for meiotic chromosome segregation, genome maintenance, and tumor suppression. RAD51AP1 (RAD51 Associated Protein 1) has been shown to interact with and enhance the recombinase activity of RAD51. Accordingly, genetic ablation of RAD51AP1 leads to enhanced sensitivity to and also chromosome aberrations upon DNA damage, demonstrating a role for RAD51AP1 in mitotic homologous recombination. Here we show physical association of RAD51AP1 with the meiosis-specific recombinase DMC1 and a stimulatory effect of RAD51AP1 on the DMC1-mediated D-loop reaction. Mechanistic studies have revealed that RAD51AP1 enhances the ability of the DMC1 presynaptic filament to capture the duplex DNA partner and to assemble the synaptic complex, in which the recombining DNA strands are homologously aligned. We also provide evidence that functional co-operation is dependent on complex formation between DMC1 and RAD51AP1, and that distinct epitopes in RAD51AP1 mediate interactions with RAD51 and DMC1. Finally, we show that RAD51AP1 is expressed in mouse testes, and that RAD51AP1 foci co-localize with a subset of DMC1 foci in spermatocytes. These results suggest that RAD51AP1 also serves an important role in meiotic homologous recombination.

Dray, Eloise; Dunlop, Myun Hwa; Kauppi, Liisa; San Filippo, Joseph San; Wiese, Claudia; Tsai, Miaw-Sheue; Begovic, Sead; Schild, David; Jasin, Maria; Keeney, Scott; Sung, Patrick

2010-11-05T23:59:59.000Z

420

ISES-AP -3rd International Solar Energy Society Conference Asia Pacific Region (ISES-AP-08) Incorporating the 46th ANZSES Conference  

E-Print Network (OSTI)

ISES-AP - 3rd International Solar Energy Society Conference ­ Asia Pacific Region (ISES-AP-08 AND ASYMMETRIC MIRROR PANELS FOR PARABOLOIDAL CONCENTRATORS G. Burgess, P. Scott and J. Pye Department concentrating dishes generally have a reflecting surface made up of a number of individual mirror panels (facets

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program < Back Eligibility Commercial Industrial Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Construction Design & Remodeling Manufacturing Sealing Your Home Windows, Doors, & Skylights Ventilation Heat Pumps Commercial Lighting Lighting Insulation Maximum Rebate Up to 100,000 per site per year. Program Info Funding Source Conservation Program Funding Charge State Oregon Program Type Utility Rebate Program Rebate Amount A/C or Heat Pumps: $25-$100/ton Economizer Control Addition: $75/ton Air-Side Economizer Repair: $250 Evaporative Coolers: $100-$300/ton

422

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

423

County Partners with Siemens on Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partners with Siemens on Energy Upgrades Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

424

Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades in Commercial Energy Efficiency Upgrades in Commercial Buildings Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings On this page you'll find information about the tax deductions available for improving the energy efficiency of commercial buildings, as well as links to qualified software available for calculating these savings. The Energy Policy Act of 2005 (EPACT) offered businesses tax deductions for the costs of improving the energy efficiency of commercial buildings. The Emergency Economic Stabilization Act of 2008 extended provisions in EPACT. The following tax incentives are available under this act. Deduction of the Cost of Energy-Efficient Property Installed in Commercial Buildings Make quick calculations of the estimated energy cost savings from

425

Non-Profit Brighter After Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade September 21, 2010 - 11:09am Addthis Loretta Prencipe Senior Communications Analyst, Office of Energy Efficiency & Renewable Energy In the Spring of 2010, the Arizona State Energy Program awarded Recovery Act funds to 14 non-profit organizations throughout the state for energy projects. One of the recipients, St. Vincent de Paul, is a human services organization that assists people in need throughout Central and Northern Arizona. The nonprofit partnered with Glendale, Arizona-based Natural Lighting Company to install skylights at the facility. In the above video, find out how this project is helping both the nonprofit and the local company. The video was created by Jim Arwood, an independent producer and former

426

Cool Roofs: An Easy Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade December 14, 2010 - 9:25am Addthis Cathy Zoi Former Assistant Secretary, Office of Energy Efficiency & Renewable Energy What does this mean for me? Dark roofs can be 50 degrees hotter than light roofs. Combined with dark roads and parking lots, dark roofs lead to the 'urban heat island' effect: cities tend to be 2-5 degrees hotter. A cooler roof means energy bills that are up to 10-15% lower because your air conditioner doesn't have to work as hard. Check out Google Earth - the 'view from above' of your favorite American city. And look at the roofs of the office buildings, warehouses, shopping centers, and even the homes. Most of them are probably pretty dark in color - and this means they heat up a lot when the weather is warm -

427

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

428

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade March 16, 2011 - 2:58pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this project do? In three hours, enough energy is recovered from the TMC to heat 15 loads of water for L&N's largest-capacity washing machine, and enough water is recovered to fill 1-1/2 loads of that same machine. As the provider of laundry and dry cleaning services for Disneyland Resort's costumes and hospitality supply items, L&N Costume and Linen Service knows a little something about both quantity and quality. Now, with the help of the Gas Technology Institute (GTI) and the Department of Energy, this forward-looking enterprise is embracing new, clean energy

429

County Partners with Siemens on Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

430

Secretary of Energy Announces Approval and Funding for Facilities Upgrade  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Approval and Funding for Facilities Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs Secretary of Energy Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs February 22, 2006 - 12:09pm Addthis NEWPORT NEWS , VA - Secretary of Energy Samuel W. Bodman today announced that President Bush's Fiscal Year 2007 budget request includes $7 million for the upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility. The secretary also visited with students and teachers from the Newport News area who participate in the lab's highly successful Becoming Enthusiastic about Math and Science (BEAMS) educational

431

Builder Brings Tradition to Efficient Home Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades October 15, 2009 - 5:51pm Addthis Joshua DeLung When Tom Wade's grandfather started building single-family homes, he may not have imagined how far his grandson would take the practice. Tom's father followed in the family footsteps and founded Artistic Homes in Albuquerque, N.M., in the mid-1980s. Now, Tom has led the company from simply building quality, affordable homes to innovating ones that are highly energy-efficient. "My grandfather would absolutely love what we're doing today because he had an incredible passion for - and an interest in - craftsmanship and improving the product, which in this case is the home," Tom says. "The fact that we're using science and technology is something he would

432

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon May 28, 2010 - 2:38pm Addthis Joshua DeLung What does this project do? Local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. 'Main streets' in Clackamas County, Oregon, are undergoing a makeover - an energy-efficiency makeover. As part of the Clackamas County Energy Efficiency on Main Street Program, local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. First to save The program needed a guinea pig to be the first to receive a free energy audit and found a willing participant in Key Carpets, a Molalla-based store

433

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

434

Microsoft Word - CX_MerrittRadioStationUpgrade_2013.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Merritt Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Winton, Chelan County, WA Township 26N, Range 16E, and Section 2 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Merritt Radio Station in the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest (USFS). The proposed radio station upgrade would replace the existing communication building, electrical service, and propane tank with a new building and propane tank in adjacent locations on the

435

SLHC, the High-Luminosity Upgrade (public event)  

ScienceCinema (OSTI)

In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

None

2011-10-06T23:59:59.000Z

436

Living Comfortably: A Consumer's Guide to Home Energy Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL Dr. Richard Knaub Project Leader in Weatherization & Workforce Development at the National Renewable Energy Laboratory Energy audit tools An infrared camera can display temperature differences between surfaces and help determine if a wall is insulated. It can show drafts and moisture, which can lead to mold problems.

437

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

438

Generic effluent monitoring system certification for AP-40 exhauster stack  

SciTech Connect

Tests were conducted to verify that the Generic Effluent Monitoring System (GEMS), as applied to the AP-40 exhauster stack, meets all applicable regulatory performance criteria for air sampling systems at nuclear facilities. These performance criteria address both the suitability of the air sampling probe location and the transport of the sample to the collection devices. The criteria covering air sampling probe location ensure that the contaminants in the stack are well mixed with the airflow at the probe location such that the extracted sample represents the whole. The sample transport criteria ensure that the sampled contaminants are quantitatively delivered to the collection device. The specific performance criteria are described in detail in the report. The tests demonstrated that the GEMS/AP-40 system meets all applicable performance criteria. The contaminant mixing tests were conducted by Pacific Northwest National Laboratory (PNNL) at the wind tunnel facility, 331-H Building, using a mockup of the actual stack. The particle sample transport tests were conducted by PNNL at the Numatec Hanford Company`s 305 Building. The AP-40 stack is typical of several 10-in. diameter stacks that discharge the filtered ventilation air from tank farms at the U.S. Department of Energy`s Hanford Site in Richland, Washington. The GEMS design features a probe with a single shrouded sampling nozzle, a sample delivery line, and sample collection system. The collection system includes a filter holder to collect the sample of record and an in-line detector head and filter for monitoring beta radiation-emitting particles. Unrelated to the performance criteria, it was found that the record sample filter holder exhibited symptoms of sample bypass around the particle collection filter. This filter holder should either be modified or replaced with a different type. 10 refs., 8 figs., 6 tabs.

Glissmeyer, J.A.; Davis, W.E.; Bussell, J.H.; Maughan, A.D.

1997-09-01T23:59:59.000Z

439

APS beamline standard components handbook, Version 1. 3  

SciTech Connect

This Handbook in its current version (1.3) contains descriptions, specifications, and preliminary engineering design drawings for many of the standard components. The design status and schedules have been provided wherever possible. In the near future, the APS plans to update engineering drawings of identified standard beamline components and complete the Handbook. The completed version of this Handbook will become available to both the CATs and potential vendors. Use of standard components should result in major cost reductions for CATs in the areas of beamline design and construction.

Hahn, U.; Shu, D.; Kuzay, T.M.

1993-02-01T23:59:59.000Z

440

Building Upgrade Manual | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Upgrade Manual Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

ENERGY STAR Building Upgrade Manual | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY STAR Building Upgrade Manual ENERGY STAR Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach

442

Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades  

Energy.gov (U.S. Department of Energy (DOE))

Energize Phoenix is saving energy and money for homeowners, generating jobs, and transforming a diverse array of neighborhoods along a 10-mile stretch of the city's light rail line. Energize Phoenix's residential programs are open to homeowners of all income levels, but low-to-moderate income homeowners may realize greater benefits from energy efficiency upgrades because their homes often have older, inefficient equipment. Because upfront costs can deter low- to moderate-income residents from making upgrades, Energize Phoenix developed two programs to specifically address energy efficiency with this audience.

443

IXS-CDT, APS Sign Memorandum of Understanding for Sector 30  

NLE Websites -- All DOE Office Websites (Extended Search)

27th, 2003 27th, 2003 IXS-CDT, APS Sign Memorandum of Understanding for Sector 30 With strokes from four ceremonial pens, the Inelastic X-ray Scattering Collaborative Development Team (IXS-CDT) became the twenty-second research group to sign up for construction of x-ray beamlines at Argonne National Laboratory's Advanced Photon Source (APS). As the diagram below shows, only 5 of a possible 35 pairs of APS x-ray beamlines remain uncommitted. The September 15, 2003, Memorandum of Understanding signing ceremony formalized the relationship between IXS-CDT and the APS. APS staff will construct the IXS-CDT beamline at sector 30 on the APS experiment hall floor. The IXS sector aims to be the best in the world for inelastic x-ray scattering, a very important application that takes full-advantage of the

444

E-Print Network 3.0 - asdex upgrade divertor Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Summary: of code runs have been done in modelling ASDEX Upgrade with a range of divertor input powers, densities... .g. by shaping of the divertor as in ASDEX Upgrade) is the...

445

Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Efficiency Upgrades Make a Big Difference to a Small Organization Energy Efficiency Upgrades Make a Big Difference to a Small Organization Photo of a man and woman standing outside...

446

Q&A: Financing Energy Efficiency Upgrades for Your Home through...  

Office of Environmental Management (EM)

Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans February 19, 2015...

447

Luteolin, a flavonoid, inhibits AP-1 activation by basophils  

SciTech Connect

Flavonoids including luteolin, apigenin, and fisetin are inhibitors of IL-4 synthesis and CD40 ligand expression by basophils. This study was done to search for compounds with greater inhibitory activity of IL-4 expression and to clarify the molecular mechanisms through which flavonoids inhibit their expression. Of the 37 flavonoids and related compounds examined, ayanin, luteolin, and apigenin were the strongest inhibitors of IL-4 production by purified basophils in response to anti-IgE antibody plus IL-3. Luteolin did not suppress Syk or Lyn phosphorylation in basophils, nor did suppress p54/46 SAPK/JNK, p38 MAPK, and p44/42 MAPK activation by a basophilic cell line, KU812 cells, stimulated with A23187 and PMA. However, luteolin did inhibit phosphorylation of c-Jun and DNA binding activity of AP-1 in nuclear lysates from stimulated KU812 cells. These results provide a fundamental structure of flavonoids for IL-4 inhibition and demonstrate a novel action of flavonoids that suppresses the activation of AP-1.

Hirano, Toru [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Higa, Shinji [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Arimitsu, Junsuke [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Naka, Tetsuji [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Ogata, Atsushi [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Shima, Yoshihito [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Fujimoto, Minoru [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Yamadori, Tomoki [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Ohkawara, Tomoharu; Kuwabara, Yusuke; Kawai, Mari [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Matsuda, Hisashi; Yoshikawa, Masayuki [Kyoto Pharmaceutical University, Kyoto 607-8412 (Japan); Maezaki, Naoyoshi; Tanaka, Tetsuaki [Graduate School of Pharmaceutical Sciences, Osaka University, Osaka 565-0871 (Japan); Kawase, Ichiro [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan); Tanaka, Toshio [Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Medical School, Osaka 565-0871 (Japan)]. E-mail: ttanak@imed3.med.osaka-u.ac.jp

2006-02-03T23:59:59.000Z

448

Ca isotopic anomaly in the atmospheres of Ap stars  

E-Print Network (OSTI)

We present results of the Ca stratification analysis in the atmospheres of 21 magnetic chemically peculiar (Ap) stars. This analysis was based on the spectral observations carried out with the UVES spectrograph attached to the 8-m VLT telescope. Ca was found to be strongly stratified in all stars with different effective temperatures and magnetic field strengths. This element is overabundant by 1-1.5 dex below logtau_5000~-1 and strongly depleted above logtau_5000=-1.5. Based on the overall Ca abundance distributions, we modelled a profile of the IR-triplet Ca II 8498 line. It shows a significant contribution of the heavy isotopes 46Ca and 48Ca, which represent less than 1% of the solar Ca isotopic mixture. In Ap stars with the relatively small surface magnetic fields (Ca isotope is concentrated close to the photosphere, while the heavy isotopes are pushed towards the outer layers. Isotopic separation disappears in the atmospheres of stars with magnetic fields above 6-7 kG. The observed overall Ca stratification and isotopic anomalies may be explained by a combined action of the radiatively-driven diffusion and the light-induced drift.

T. Ryabchikova; O. Kochukhov; S. Bagnulo

2007-03-13T23:59:59.000Z

449

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

450

E-Print Network 3.0 - aps experiment hall Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Applied Physics Email: kejilai@stanford.edu Summary: ) Si", APS March Meeting, Montreal Canada, March 2004. "Fractional Quantum Hall Effect in SiSi1-x... Gex...

451

E-Print Network 3.0 - ap radiographs including Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Information Sciences 5 Eccentricity Error Correction for Automated Estimation of Polyethylene Wear after Total Hip Arthroplasty Summary: in an anteroposterior (AP) radiograph....

452

E-Print Network 3.0 - ap-1 endosomal coat Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

vesicles... adaptor AP-1 and the kinesin motor KIF13A together create peripheral recycling endosomal subdomains... of endosomes ... Source: Lippincott-Schwartz, Jennifer -...

453

Upgrade LCDs or TVs with improved ergonomic adjustability  

E-Print Network (OSTI)

Highlights · Upgrade LCDs or TVs with improved ergonomic adjustability · Constant Force (CFTM comfort and productivity · 5 (130 mm) height range easily meets the ergonomic height needs of the average compliant Product Sheet Affordable desktop ergonomics Neo-FlexTM LCD Stand 870-05-067, rev. 03/08/07 www

Saskatchewan, University of

454

Progress in MPC and A upgrades at Luch  

SciTech Connect

Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch.

Mizin, P.; Chukov, V.; Rogatchev, V. [Gosudarstvennyj Nauchno-Issledovatel`skij Inst. NPO Luch, Podol`sk (Russian Federation); Curtiss, J. [Brookhaven National Lab., Upton, NY (United States); Erkkila, B. [Los Alamos National Lab., NM (United States); Goodey, K. [Pacific Northwest National Lab., Richland, WA (United States); Hembree, D. Jr. [Oak Ridge National Lab., TN (United States); Lowe, D. [Sandia National Labs., Albuquerque, NM (United States); Turner, C. [Lawrence Livermore National Lab., CA (United States)

1997-09-01T23:59:59.000Z

455

Tank farm instrumentation and data acquisition/management upgrade plan  

SciTech Connect

This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment.

Scaief, C.C. III

1994-09-13T23:59:59.000Z

456

Runner upgrading: Learning from Ontario Hydro`s experience  

SciTech Connect

Planning, design, and implementation of turbine runner replacement at Ontario Hydro is described in the article. The use of fully homologous modeling for upgrade projects, including both francis and propeller runner types, is outlined. Confirmation of physical model efficiency is obtained through numerical modeling. Inlet connections, setting cavitation-erosion guarantees, and other guarantees included in tender documents are also described in some detail.

Kee, D.C.; Markovich, M.S.; Munro, R.I. [Ontario Hydro (Canada)

1997-02-01T23:59:59.000Z

457

Ash Deposition Behavior of Upgraded Brown Coal and Bituminous Coal  

Science Journals Connector (OSTI)

Ash Deposition Behavior of Upgraded Brown Coal and Bituminous Coal ... Ash with a low melting point causes slagging and fouling problems in pulverized coal combustion boilers. ... The ash composition in coal and operational conditions in boilers such as heat load greatly affect the ash deposition behavior. ...

Katsuya Akiyama; Haeyang Pak; Toshiya Tada; Yasuaki Ueki; Ryo Yoshiie; Ichiro Naruse

2010-07-22T23:59:59.000Z

458

Upgraded recovery boiler meets low air emissions standards  

SciTech Connect

In the fall of 1990, the Boise Cascade mill in International Falls, MN, carried out a millwide modernization project. One critical element of the project was the upgrade of their recovery boiler. As a result of the recovery boiler upgrade, the mill was required to obtain a prevention of significant deterioration (PSD) air permit. A best available control technology (BACT) assessment was performed as a requirement of the PSD regulations. Ultimately, a number of more stringent air pollution emission limits were established for the boiler, and a continuous emissions monitoring system (CEMS) was purchased and installed to report daily results to the Minnesota Pollution Control Agency. This paper describes efforts to achieve increased firing capacity in the mill's recovery boiler while meeting more severe air emissions regulations. The authors will show that each of the emissions limits, including CO, SO[sub 2], NO[sub x], TRS, and opacity, are met by the upgraded boiler, while achieving an increase in firing capacity over pre-upgrade levels of up to 40%.

La Fond, J.F.; Jansen, J.H. (Jansen Combustion and Boiler Technologies, Inc., Woodinville, WA (United States)); Eide, P. (Boise Cascade Corp., International Falls, MN (United States))

1994-12-01T23:59:59.000Z

459

Recent Upgrade of the Klystron Modulator at SLAC  

SciTech Connect

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

2011-11-04T23:59:59.000Z

460

Employee-Focused Structure Helps Produce Upgrades for Contractor  

Energy.gov (U.S. Department of Energy (DOE))

Progressive Building Solutions, an energy efficiency contractor participating in Seattle, Washington's Community Power Works program, has an intriguing model to help its employees feel connected to the company's successemployees are part owners. The company's creator, Suraj Lobo, built Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work.

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Westover ARB Fuel Hydrant System Upgrade set to begin  

E-Print Network (OSTI)

Westover ARB Fuel Hydrant System Upgrade set to begin Story on page 4 #12;2 YANKEE ENGINEER August, many along the East Coast felt the impact of Hurricane Sandy, one of the largest hurricanes in history's way. · Make sure to fully charge your cell phone or other mobile devices so you can communicate after

US Army Corps of Engineers

462

Innovative Technology Improves Upgrading Process for Unconventional Oil  

NLE Websites -- All DOE Office Websites (Extended Search)

09, 2013 09, 2013 Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Washington, D.C. - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil recovery methods, such as steam and hot water injection, to reduce its viscosity and enable it to flow. The largest U.S. deposits of heavy oil are in California and on Alaska's North Slope. Estimates for the U.S. heavy oil resource total about 104 billion barrels of oil in place - nearly five times the United States' proved reserves. In addition, although no commercial-scale development of U.S. oil sands or oil shale has yet occurred, both represent another potential future domestic unconventional oil resource.

463

T Plant secondary containment and leak detection upgrades  

SciTech Connect

The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.

Carlson, T.A.

1995-10-19T23:59:59.000Z

464

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Progress Report on Joint ATLAS/CMS  

E-Print Network (OSTI)

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Progress Report on Joint ATLAS/CMS SLHC Opto ATLAS Tracker Upgrade Workshop 2 Outline Introduction Subgroups activities Summary #12;K.K. Gan ATLAS System #12;K.K. Gan ATLAS Tracker Upgrade Workshop 4 Group A: Lesson Learned and to be Learned from LHC

Gan, K. K.

465

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module  

E-Print Network (OSTI)

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module and a Frontend of the optimum technology and layout of the tracking detectors for the upgraded ATLAS ID. The goal for the intermediate tracking region in the upgraded ATLAS ID. We anticipate that much of the work would then also

California at Santa Cruz, University of

466

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench-scale. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. The project is on schedule and on budget. Task 4, a bench-scale demonstration of the ultra-fast TSA system is complete. Rapid thermal swing of an adsorbent bed using microchannels has been successfully demonstrated and the separation of a 70% methane and 30% nitrogen was purified to 92% methane. The bench-scale demonstration unit was small relative to the system dead volume for the initial phase of experiments and a purge step was added to sweep the dead volume prior to desorbing the bed and measuring purity. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement.

Anna Lee Tonkovich

2005-07-01T23:59:59.000Z

467

Low rank coal upgrading in a flow of hot water  

SciTech Connect

Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura [Kyoto University, Kyoto (Japan). Department of Chemical Engineering

2009-09-15T23:59:59.000Z

468

AP-2-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

469

APS User News-at-a-Glance, Issue 48  

NLE Websites -- All DOE Office Websites (Extended Search)

8, August 12, 2008 8, August 12, 2008 CONTENTS MESSAGE FROM MURRAY SCIENCE NEWS 1. First Light Successfully Delivered to New Coherent X-ray Diffraction Microscope at 2-ID-B USER MATTERS 2. Renewal Plan Update: Timeline, Web Resources, and Ways You Can Participate FACILITY NEWS 3. APS Holds First Geological, Environmental, and Planetary Science Cross-cut Review 4. September 17 PUC and APSUO Steering Committee Meetings Focus on Renewal 5. Emergency Supplemental Funding Enables a Regular Schedule for 2008-3 Run PEOPLE NEWS 6. Gabrielle Long Steps Down as Division Director of XSD BRIEFLY NOTED --DOE Light Sources Coordinate Workshop Scheduling --BioCARS Hosts Workshop on Time-resolved Macromolecular Crystallography, November 20-22, 2008 --ChemMatCARS Hosts Workshop on Advanced Crystallography, December 3-5,

470

Microsoft PowerPoint - aps2007-abstract.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

on MSE: theory S. Scott (PPPL) J. Ko, I. Hutchinson (PSFC/MIT) H. Yuh (Nova Photonics) Poster NP8.00087 49 th Annual Meeting, DPP-APS Orlando, FL November 2007 Abstract A standard calibration technique for Motional Stark Effect (MSE) diagnostics is to compare the polarization direction of Doppler-shifted Hα emission from a diagnostic neutral beam (DNB) that is fired into a gas-filled torus to the pitch angle inferred from known toroidal and vertical fields. However, the polarization direction of Hα emission from "secondary" beam neutrals that ionize, gyrate about field lines, and then charge exchange a second time differs from the polarization direction of the primary beam neutrals and thus confuses the calibration results. We compute the ratio of secondary-to-primary H emission, I

471

AP-3-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B Wholesale Power Rate Schedule 3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download

472

The chemical abundances of the Ap star HD94660  

SciTech Connect

In this work I present the determination of chemical abundances of the Ap star HD94660, a possible rapid oscillating star. As all the magnetic chemically peculiar objects, it presents CNO underabundance and overabundance of iron peak elements of ?100 times and of rare earths up to 4 dex with respect to the Sun. The determination was based on the conversion of the observed equivalent widths into abundances simultaneously to the determination of effective temperature and gravity. Since the Balmer lines of early type stars are very sensitive to the surface gravity while the flux distribution is sensitive to the effective temperature, I have adopted an iterative procedure to match the H{sub ?} line profile and the observed UV-Vis-NIR magnitudes of HD94660 looking for a consistency between the metallicity of the atmosphere model and the derived abundances. From my spectroscopic analysis, this star belongs to the no-rapid oscillating class.

Giarrusso, M. [Universit di Catania, Dipartimento di Fisica e Astronomia, Sezione Astrofisica, Via S. Sofia 78, 95123 Catania (Italy); INAF - Osservatorio Astrofisico di Catania, via S. Sofia 78, 95123 Catania (Italy); INFN - Laboratori Nazionali del Sud (Italy)

2014-05-09T23:59:59.000Z

473

Fabrication and Testing of Deflecting Cavities for APS  

SciTech Connect

Jefferson Lab (Newport News, Virginia) in collaboration with Argonne National Laboratory (Argonne, IL) has fabricated and tested four first article, 2.8 GHz, deflecting SRF cavities, for Argonne's Short-Pulse X-ray (SPX) project. These cavities are unique in many ways including the fabrication techniques in which the cavity cell and waveguides were fabricated. These cavity subcomponents were milled from bulk large grain niobium ingot material directly from 3D CAD files. No forming of sub components was used with the exception of the beam-pipes. The challenging cavity and helium vessel design and fabrication results from the stringent RF performance requirements required by the project and operation in the APS ring. Production challenges and fabrication techniques as well as testing results will be discussed in this paper.

Mammosser, John; Wang, Haipeng; Rimmer, Robert; Jim, Henry; Katherine, Wilson; Dhakal, Pashupati; Ali, Nassiri; Jim, Kerby; Jeremiah, Holzbauer; Genfa, Wu; Joel, Fuerst; Yawei, Yang; Zenghai, Li

2013-09-01T23:59:59.000Z

474

An ancillary pumping system for the APS vacuum system  

SciTech Connect

An ancillary pumping system has been designed and installed in the Advanced Photon Source (APS) storage ring. This vacuum system has the ability to pump sectors of the storage ring down from room pressure to ultra-high vacuum (UHV). The ancillary system is a {open_quotes}dry{close_quotes} system that uses a combination of turbomolecular pumps and oil-free roughing pumps. The benefits of this system are the reduction of equipment needed for in-tunnel maintenance, essential for the operation of a UHV storage ring; rapid response to vacuum emergencies and a guard to accidental exposures to hydrocarbon contamination. The operational logic and the pump interlock and controls are described.

Walters, D.; Noonan, J.; Gagliano, J. [and others

1997-06-01T23:59:59.000Z

475

Absolute Properties of the Eclipsing Binary Star AP Andromedae  

E-Print Network (OSTI)

AP And is a well-detached F5 eclipsing binary star for which only a very limited amount of information was available before this publication. We have obtained very extensive measurements of the light curve (19097 differential V magnitude observations) and a radial velocity curve (83 spectroscopic observations) which allow us to fit orbits and determine the absolute properties of the components very accurately: masses of 1.277 +/- 0.004 and 1.251 +/- 0.004 solar masses, radii of 1.233 +/- 0.006 and 1.1953 +/- 0.005 solar radii, and temperatures of 6565 +/- 150 K and 6495 +/- 150 K. The distance to the system is about 400 +/- 30 pc. Comparison with the theoretical properties of the stellar evolutionary models of the Yonsei-Yale series of Yi et al. shows good agreement between the observations and the theory at an age of about 500 Myr and a slightly sub-solar metallicity.

Lacy, Claud H Sandberg; Fekel, Francis C; Muterspaugh, Matthew W

2014-01-01T23:59:59.000Z

476

AP-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-B Wholesale Power Rate Schedule 1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.

477

APS User News-at-a-Glance, Issue 52  

NLE Websites -- All DOE Office Websites (Extended Search)

2, March 3, 2009 2, March 3, 2009 CONTENTS MESSAGE FROM MURRAY SCIENCE NEWS 1. Life Sciences CAT Coaxes Four Beams from One Port, Offers New Membership Mode 2. Science & Research Highlights 3. White Paper on "Science and Technology of Future Light Sources" Online USER MATTERS 4. How Are We Doing? 5. Management Changes in the APS X-Ray Science Division 6. General and Partner User Proposal Deadlines 7. User Agreements 8. General User Program Advisory Committee Established FACILITY NEWS 9. Search to Begin for the Next Accelerator Systems Division Director 10. Users Week 2009 Update BRIEFLY NOTED -- Rate Increase at Argonne Guest House -- Deadline for the Eleventh National School on Neutron and X-ray Scattering is March 7 -- Deadline Changed for Argonne Director's Postdoctoral Fellowships

478

Implementation and Testing of Fault-Tolerant Photodiode-based Active Pixel Sensor (APS)  

E-Print Network (OSTI)

Implementation and Testing of Fault-Tolerant Photodiode-based Active Pixel Sensor (APS) Sunjaya the photodiode and readout transistors into two parallel operating devices, while keeping a common row select-tolerant photodiode APS was designed and fabricated using a CMOS 0.18µm process. Testing included both fully

Chapman, Glenn H.

479

Biomedical and Physical Sciences (BPS) Building, MSU Ohio Section of the APS  

E-Print Network (OSTI)

Biomedical and Physical Sciences (BPS) Building, MSU Ohio Section of the APS Spring Meeting April, University of Maryland 4:30 - 5:00 APS Section Announcements 5:30 - 6:30 Poster Session (Kellogg Center Big Ten Room) 6:30 - 7:00 Social Hour (Kellogg Center Big Ten Room) 7:00 - 8:00 Banquet (Kellogg Center

480

Rose of APS and CNM One of Four DOE Early Career Award Winners  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientists Close-In on Artificial Spider Silk Scientists Close-In on Artificial Spider Silk Ekiert Earns 2012 APSUO Franklin Award for Studies of Influenza Virus Clever Apes on WBEZ: Breaking the Fossil Record Gerig to Chair Particle Accelerator School Board A Record Run for the APS X-ray Source APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Rose of APS and CNM One of Four DOE Early Career Award Winners MAY 16, 2012 Bookmark and Share Volker Rose with the prototype high-resolution microscope at the nanoprobe beamline on APS Sector 26. Volker Rose, assistant physicist with the U.S. Department of Energy (DOE) Office of Science's Advanced Photon Source X-ray Science Division (XSD) and Center for Nanoscale Materials (CNM) at Argonne National Laboratory is

Note: This page contains sample records for the topic "appointed aps upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

The Hvar survey for roAp stars: II. Final results (Research Note)  

E-Print Network (OSTI)

The 60 known rapidly oscillating Ap (roAp) stars are excellent laboratories to test pulsation models in the presence of stellar magnetic fields. Our survey is dedicated to search for new group members in the Northern Hemisphere. We attempt to increase the number of known chemically peculiar stars that are known to be pulsationally unstable. About 40 h of new CCD photometric data of 21 roAp candidates, observed at the 1m Austrian-Croatian Telescope (Hvar Observatory) are presented. We carefully analysed these to search for pulsations in the frequency range of up to 10mHz. No new roAp star was detected among the observed targets. The distribution of the upper limits for roAp-like variations is similar to that of previoius similar efforts using photomultipliers and comparable telescope sizes. In addition to photometric observations, we need to consolidate spectroscopic information to select suitable targets.

Paunzen, E; Rode-Paunzen, M; Handler, G; Bozic, H

2015-01-01T23:59:59.000Z

482

The Chicago Tribune sees the "wonder" in APS  

NLE Websites -- All DOE Office Websites (Extended Search)

The Chicago Tribune sees the "wonder" in APS The Chicago Tribune sees the "wonder" in APS Clipping of Chicago Tribune Ever wonder what the editors of the Chicago Tribune think of the Advanced Photon Source (APS)? Wonder no more. True, the APS didn't make the cut as one of the "official" "7 Wonders of Chicago" in a reader-survey contest recently staged by the newspaper. (All seven finalists happen to be located within Chicago city limits.) But the APS and its technologies were deemed worthy of singling out as a wonder nonetheless in the closing two paragraphs of the September 15, 2005, story on the contest in the paper's Tempo section. "You told us about things we had never thought of," wrote Tribune senior correspondent Charles Leroux. "For instance, the Advanced Photon Source at

483

ANL/APS/TB-54, Dose Calculations using MARS for Bremsstrahlung Beam Stops and Collimators in APS Beamline Stations  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 DOSE CALCULATIONS USING MARS FOR BREMSSTRAHLUNG BEAM STOPS AND COLLIMATORS IN APS BEAMLINE STATIONS Jeffrey C. Dooling Accelerator Systems Division Advanced Photon Source August 2010 This work is sponsored by the US Department of Energy Office of Science The submitted manuscript has been created by UChicago Argonne, LLC, Operator of Argonne National Laboratory ("Argonne"). Argonne, a U.S. Department of Energy Office of Science laboratory, is operated under Contract No. DE-AC02-06CH11357. The U.S. Government retains for itself, and others acting on its behalf, a paid-up nonexclusive, irrevocable worldwide license in said article to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display

484

MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements  

NLE Websites -- All DOE Office Websites (Extended Search)

MFRSR Head Refurbishment, Data Logger Upgrade MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements Gary Hodges, CIRES/NOAA and John Schmelzer, PNL gary.hodges@noaa.gov, john.schmelzer@pnl.gov 17th Annual ARM Science Team Meeting 26-30 March 2006 Monterey, CA Head Refurbishment The Process Includes: * New filter detectors * Relocate internal thermistors * New connectors * Gain resistors moved to head * Improved insulation The Finished Heads: * Are lamp calibrated * Have filter profiles measured * Cosine characterized * Are out-of-band tested What Does This Mean For Data Users? * Fewer data gaps * Fewer DQRs * Confidence in the data * Well calibrated data Calibration Improvements 5 6 7 8 0 2 4 6 Airmass ln Direct Data will now be calibrated by the Langley method Extrapolate to TOA to get V 0 Benefits of Langley vs. Lamp calibrations:

485

HERA Luminosity Upgrade Magnet Production | Superconducting Magnet Division  

NLE Websites -- All DOE Office Websites (Extended Search)

HERA Luminosity Upgrade Magnet Production HERA Luminosity Upgrade Magnet Production Photos taken on or before 12-May-2000. GO horizontal test setup GO horizontal test setup view toward lead tower GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO Coldmass GO Coldmass GO sextupole coil GO sextupole coil GO quadrupole coil lead end GO quadrupole coil lead end

486

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

487

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Albion Butte Radio Station Communication Upgrade Budget Information: Work Order # 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Cassia County, Idaho - Section 19, Township 11 South, Range 26 East of the Nibbs Creek Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade the communication building and equipment at BPA's Albion Butte Radio Station located in Cassia County, ID. This project is part of an

488

Microsoft Word - Holcomb and Naselle Communication Upgrade CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Holcomb Radio Station and Naselle Substation Communication Upgrade Project Budget Information: Work Order # 00253203 and # 00253206 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Locations: Holcomb Radio Station: Pacific County, Washington - Township 13 North, Range 7 West, Section 30 of the Lebam Quadrangle Naselle Substation: Pacific County, Washington - Township 10 North, Range 9 West, Section 4 of the Oman Ranch Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to upgrade the communication equipment at

489

Posted CX Q14 Sprinkler System Upgrade.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(NEPA) Categorical Exclusion (eX) (NEPA) Categorical Exclusion (eX) Determination Summary Form Q14 Sprinkler System Upgrade Project REFERENCE J 10 CFR Part 1021 , Department of Energy National Environmental Policy Act Implementation Procedures, Subpart 0 , Typical Classes of Actions PROJECT SCOPE DISCUSSION The project scope will upgrade the Q14 sprinkler system to meet exposed plastic design basis requirements by installing a fire pump and performing modifications to the Q14 sprinkler piping. The fire pump will be a pre-assembled skid system with enclosure diesel powered pump and associated diesel storage tank. The fire pump assembly wi ll be located on a foundation pad in the grassy area ,;!orthwest of 014. Electrical work will include providing general power to the fire pump building and fire pump control/alarm wiring to a fire alarm panel in the 014

490

Investment and Upgrade in Distributed Generation under Uncertainty  

NLE Websites -- All DOE Office Websites (Extended Search)

Investment and Upgrade in Distributed Generation under Uncertainty Investment and Upgrade in Distributed Generation under Uncertainty Speaker(s): Afzal Siddiqui Karl Maribu Date: September 4, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose The ongoing deregulation of electricity industries worldwide is providing incentives for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via heat exchangers (HXs) to meet local energy loads. Although the electric-only effciency of DG is lower than that of central-station production, relatively high tariff rates and the potential for CHP applications increase the attractiveness of on-site generation. Nevertheless, a microgrid contemplating the installation of gas-fired DG has to be aware of the uncertainty in the

491

Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Steve Prickett Project Manager - TEP Proposed Action: Lower Mid-Columbia / Midway-Vantage 230-kV Transmission Line Upgrade Project Budget Information: Work Order #238901 and #231311, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility..." B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. B4.13 "Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines

492

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

493

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

494

Interaction Region Upgrades of e+ e- B-Factories  

SciTech Connect

Both the PEP-II and KEKB B-Factories have plans to upgrade their Interaction Regions (IRs) in order to improve luminosity performance. Last summer PEP-II added cooling to the IR beam pipe in order to increase beam currents thereby raising the luminosity. In addition, PEP-II is working on a design that modifies the permanent magnets near the Interaction Point (IP) for an even higher luminosity increase. KEKB is also planning an improvement to their IR that will decrease the detector beam pipe radius. In addition, KEK has a design to increase the luminosity of KEKB to 1 x 10{sup 35} cm{sup -2} sec{sup -1} which includes changes to the IR. PEP-II is also investigating the feasibility of a 1 x 10{sup 36} cm{sup -2} sec{sup -1} luminosity design. I summarize these various upgrades and concentrate on issues common to the different designs.

Sullivan, M.; /SLAC

2008-02-22T23:59:59.000Z

495

Upgrading the Radioactive Waste Management Infrastructure in Azerbaijan  

SciTech Connect

Radionuclide uses in Azerbaijan are limited to peaceful applications in the industry, medicine, agriculture and research. The Baku Radioactive Waste Site (BRWS) 'IZOTOP' is the State agency for radioactive waste management and radioactive materials transport. The radioactive waste processing, storage and disposal facility is operated by IZOTOP since 1963 being significantly upgraded from 1998 to be brought into line with international requirements. The BRWS 'IZOTOP' is currently equipped with state-of-art devices and equipment contributing to the upgrade the radioactive waste management infrastructure in Azerbaijan in line with current internationally accepted practices. The IAEA supports Azerbaijan specialists in preparing syllabus and methodological materials for the Training Centre that is currently being organized on the base of the Azerbaijan BRWS 'IZOTOPE' for education of specialists in the area of safety management of radioactive waste: collection, sorting, processing, conditioning, storage and transportation. (authors)

Huseynov, A. [Baku Radioactive Waste Site IZOTOP, Baku (Azerbaijan); Batyukhnova, O. [State Unitary Enterprise Scientific and Industrial Association Radon, Moscow (Russian Federation); Ojovan, M. [Sheffield Univ., Immobilisation Science Lab. (United Kingdom); Rowat, J. [International Atomic Energy Agency, Dept. of Nuclear Safety and Security, Vienna (Austria)

2007-07-01T23:59:59.000Z

496

Upgrade of the proximity focusing RICH at Jlab  

SciTech Connect

The Hall A RICH at Jefferson Lab is undergoing an upgrade to adapt to the higher momentum kinematics of the neutron spin structure Transversity experiments planned to run in 2008. The JLab RICH is a proximity focusing detector using liquid C6F14 as Cherenkov radiator, a thin layer of CsI as photon converter, evaporated on segmented pad panels of a proportional chamber. The original RICH had a superior hadron identification up to 2 GeV/c with pion/kaon rejection at the level of 1:1000 at ~ similar90% intrinsic efficiency. The upgrade will extend this performance above 2.4 GeV/c by means of a larger photon detector (a multiwire-multipad proportional chamber) and a longer proximity gap which will improve the photon detection geometrical efficiency and the angular resolution, respectively.

Cisbani, Evaristo; Colilli, Stefano; Cusanno, Francesco; Fratoni, Rolando; Frullani, Salvatore; Garibaldi, Franco; Giuliani, Fausto; Gricia, Massimo; Lucentini, Maurizio; Santavenere, Fabio; Urciuoli, Guido; Iodice, Mauro; Argentieri, A.; de Cataldo, Giacinto; De Leo, Raffaele; Lagamba, Luigi; Marrone, Stefano; Nappi, E.; Camsonne, Alexandre; Kross, Brian; Michaels, Robert; Reitz, Bodo; Segal, John; Wojtsekhowski, Bogdan; Zorn, Carl; Monno, E.; Breuer, Herbert

2009-09-01T23:59:59.000Z

497

Phased approach to the LHC Insertion Upgrade and Magnet Challenges  

E-Print Network (OSTI)

The LHC is on its way for operation with beam in 2008. The first goal of CERN and the LHC community is to ensure that the collider is operated efficiently, gradually reaching its maximal performance. In parallel, discussions have started and there is already a wealth of ideas on the possible directions for upgrading the LHC insertions. In this talk, we illustrate some of the constraints limiting the upgrade scenarios, and argue that a phased approach with several intermediate targets is necessary. In the first phase, the known bottleneck in the low-? triplets needs to be removed in the perspective of the physics run of 2013. This phase relies on the mature Nb-Ti superconducting magnet technology, where improvements for a small scale production are still possible.

Ostojic, R

2008-01-01T23:59:59.000Z

498

Using EPICS enabled industrial hardware for upgrading control systems  

SciTech Connect

Los Alamos National Laboratory has been working with National Instruments (NI) and Cosy lab to implement EPICS Input Output Controller (IOC) software that runs directly on NI CompactRIO Real Time Controller (RTC) and communicates with NI LabVIEW through a shared memory interface. In this presentation, we will discuss our current progress in upgrading the control system at the Los Alamos Neutron Science Centre (LANSCE) and what we have learned about integrating CompactRIO into large experimental physics facilities. We will also discuss the implications of using Channel Access Server for LabVIEW which will enable more commercial hardware platforms to be used in upgrading existing facilities or in commissioning new ones.

Bjorkland, Eric A [Los Alamos National Laboratory; Veeramani, Arun [NATIONAL INSTRUMENTS; Debelle, Thierry [NATIONAL INSTRUMENTS

2009-01-01T23:59:59.000Z

499

Microwave interferometer for plasma-density measurement on TMX Upgrade  

SciTech Connect

A four-channel microwave interferometer operating at 140 GHz has been designed for installation on the upgrade to the Tandem Mirror Experiment (TMX Upgrade). The instrument can be used to measure plasma density simultaneously at four locations: by reconnecting the waveguide runs, density can be measured at other locations of interest. The design is an outgrowth of a system used on TMX, but includes some newly developed hardware. An over-mode circular waveguide system is used to transport the signals over long distances with only moderate losses. Several precautions have been taken to limit the effect of possible interference from the electron cyclotron resonant heating (ECRH) system used to heat the plasma. A high-resolution linear phase comparator has been designed that will operate over the wide range of signals expected. A CAMAC-based data-acquisition system provides for automatic data sampling and archival after each shot.

Coffield, F.E.; Stever, R.D.; Lund, N.P.

1981-09-25T23:59:59.000Z

500

UPGRADING THE AGS TO 1 MW PROTON BEAM POWER.  

SciTech Connect

The Brookhaven Alternating Gradient Synchrotron (AGS) is a strong focusing accelerator that is used to accelerate protons and various heavy ion species to an equivalent proton energy of 29 GeV. At this energy the maximum intensity achieved is around 7 x 10{sup 13} protons per pulse. This corresponds to an average beam power of about 0.2 MW. Future programs in high-energy physics, as for instance a neutrino factory with the AGS as the proton driver [l], may require an upgrade of the AGS to an average beam power of 1 MW, at the energy of 24 GeV. This can be achieved with an increase of the beam intensity to 1 x 1014 protons per pulse, a 1.2-GeV superconducting linac as a new injector, and by upgrading the power supply and rf systems to allow cycling at 2.5 beam pulses per second.

BRENNAN,M.J.; MARNERIS,I.; ROSER,T.; RUGGIERO,A.G.; TRBOJEVIC,D.; ZHANG,S.Y.

2001-06-18T23:59:59.000Z