National Library of Energy BETA

Sample records for antonio missions grand

  1. Mesa Grande Band of Mission Indians- 2004 Project

    Broader source: Energy.gov [DOE]

    The Mesa Grande Band of Mission Indians, located in northern San Diego County, will conduct a study of the feasibility of reducing air pollution generated on the reservation by an over-reliance on wood-burning stoves, kerosene heaters, and gasoline generators, and to identify the types of renewable energy systems that could be used for residential structures and well-pump systems.

  2. Antonio Bouza

    Broader source: Energy.gov [DOE]

    Antonio M. Bouza is a Technology Manager with the U.S. Department of Energy (DOE), Building Technologies Office (BTO). He is the emerging technology lead on Heating, Ventilating, and Air...

  3. EECBG Success Story: San Antonio Small Businesses "Seeing the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    As part of San Antonio's "Mission Verde" initiative, the city launched the City Lights Small Business Lighting Retrofit Program using Recovery Act funding through the Energy ...

  4. Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    breaks ground on key sediment control project November 5, 2009 Structures will limit flow of sediments toward Rio Grande Los Alamos, New Mexico, November 5, 2009- Crews broke...

  5. Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    breaks ground on key sediment control project November 5, 2009 Structures will limit flow of sediments toward Rio Grande Los Alamos, New Mexico, November 5, 2009- Crews broke ground this week on one of two engineered structures in a Los Alamos National Laboratory environmental project to reduce the flow of sediments down two canyons toward the Rio Grande. Called "grade-control" structures, the approximately $2 million features are up to eight feet high and made of rocks packed tightly

  6. Grand Challenge Kicks Off with 34 Entries to Improve ORP Mission

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – The 2016 EM Office of River Protection (ORP) Grand Challenge submissions are in, with 34 entries ranging in subject from methods to treat waste in Hanford’s western tank farms to software for waste processing.

  7. EECBG Success Story: New San Antonio Airport Terminal Generating...

    Broader source: Energy.gov (indexed) [DOE]

    new photovoltaic system at the San Antonio International Airport. The new photovoltaic system at the San Antonio International Airport. In early 2010, the City of San Antonio's ...

  8. San Antonio, Texas Data Dashboard | Department of Energy

    Energy Savers [EERE]

    Data Dashboard San Antonio, Texas Data Dashboard The data dashboard for San Antonio, Texas, a partner in the Better Buildings Neighborhood Program. San Antonio Data Dashboard ...

  9. Mission

    Broader source: Energy.gov [DOE]

    Mission StatementThe EM-LA mission is to safely, efficiently, and with full transparency complete the cleanup of legacy contamination and waste resulting from nuclear weapons development and...

  10. Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Proud Legacy, Bold Future, Since 1943 Mission Los Alamos National Laboratory's mission is to solve national security challenges through scientific excellence. Mission, Vision, Values» Goals, Strategies» Nuclear Deterrence and Stockpile Stewardship» Protecting Against Nuclear Threats» Emerging Threats and Opportunities» Energy Security Solutions» Cibola satellite Scientist, Daniel Seitz, works on the Cibola satellite at LANL. Cibola is part of the U.S. Department of Defense Space

  11. Mission

    Broader source: Energy.gov [DOE]

    Office of Project Management Oversight & Assessments (PM)The primary mission of the Office of Project Management Oversight & Assessments is to provide corporate oversight, managerial...

  12. Mission

    Broader source: Energy.gov [DOE]

    The mission of the Office of Environmental Management (EM) is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government...

  13. Mission

    Broader source: Energy.gov [DOE]

    The mission of the U.S. Department of Energy’s Southeastern Power Administration is to market and deliver Federal hydroelectric power at the lowest possible cost to public bodies and...

  14. Mission

    Broader source: Energy.gov [DOE]

    The primary mission of the Office of Nuclear Energy is to advance nuclear power as a resource capable of meeting the Nation's energy, environmental, and national security needs by resolving...

  15. Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission The Nevada National Security Site (NNSS) CTOS program mission is to develop and deliver the most realistic and highest quality training in support of homeland security using extensive radiological expertise with the unique assets of the NNSS. Background The U.S. Department of Energy, National Nuclear Security Administration (NNSA) is a member of the National Domestic Preparedness Consortium. CTOS develops and conducts training courses for U.S. Department of Homeland Security (DHS)

  16. Antonio Ruette Agroindustrial Ltda | Open Energy Information

    Open Energy Info (EERE)

    Ruette Agroindustrial Ltda Jump to: navigation, search Name: Antonio Ruette Agroindustrial Ltda Place: Para-so, Sao Paulo, Brazil Zip: 15825-000 Product: Sao Paulo-based...

  17. Grupo Santo Antonio | Open Energy Information

    Open Energy Info (EERE)

    Name: Grupo Santo Antonio Place: Macei, Alagoas, Brazil Zip: 57022-140 Sector: Bioenergy Product: Alagoas-based ethanol, sugar and bioenergy producer company. Coordinates:...

  18. EERE Success Story-San Antonio Better Buildings Partners Recognized...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In April, the Energy Department recognized Better Buildings Challenge San Antonio, Texas ... San Antonio Housing Authority (SAHA), learning how each organization is meeting their ...

  19. Clean Cities: Alamo Area Clean Cities (San Antonio) coalition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alamo Area Clean Cities (San Antonio) Coalition The Alamo Area Clean Cities (San Antonio) coalition works with vehicle fleets, fuel providers, community leaders, and other...

  20. San Antonio, Texas: Solar in Action (Brochure), Solar America...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Antonio, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Antonio, Texas: Solar in Action (Brochure), Solar America Cities, ...

  1. SAN ANTONIO SPURS DEMAND FOR ENERGY EFFICIENCY

    Broader source: Energy.gov [DOE]

    As a city that experiences seasonal spikes in energy demand and accompanying energy bills, San Antonio, Texas, wanted to help homeowners and businesses reduce their energy use and save on energy...

  2. Mayor Antonio Villaraigosa (Energy All Stars Presentation)

    Broader source: Energy.gov [DOE]

    Los Angeles Mayor Antonio Villaraigosa delivered this presentation touting the energy efficiency and renewable energy related accomplishments of his city at the Energy All Stars event on January 19...

  3. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rio Grande Rio Grande In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its...

  4. Grand Challenges

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Challenges Grand Challenges Our goals to live a sustainable future LANL stakeholders TA-21 cleanup activities water on LANL land Collaborate with our stakeholders and tribal...

  5. San Antonio's City Lights program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Ronald McDonald houses in San Antonio serve as a home-away-from-home for families with children being treated at medical facilities in San Antonio. Pat Bivin, executive ...

  6. EECBG Success Story: Bike Sharing in Texas: San Antonio Rolls...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bike Sharing in Texas: San Antonio Rolls Out Program Aimed at Energy Efficiency and Public Health EECBG Success Story: Bike Sharing in Texas: San Antonio Rolls Out Program Aimed at ...

  7. Tenth ARM Science Team Meeting Proceedings, San Antonio, Texas...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tenth ARM Science Team Meeting Proceedings, San Antonio, Texas, March 13-17, 2000 2 ... Tenth ARM Science Team Meeting Proceedings, San Antonio, Texas, March 13-17, 2000 3 Figure ...

  8. San Antonio, Texas Data Dashboard | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Dashboard San Antonio, Texas Data Dashboard The data dashboard for San Antonio, Texas, a partner in the Better Buildings Neighborhood Program. San Antonio Data Dashboard (307.93 KB) More Documents & Publications Massachusetts -- SEP Data Dashboard Eagle County, Colorado Data Dashboard Cincinnati Data Dashboard

  9. San Antonio, Texas Summary of Reported Data | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary of Reported Data San Antonio, Texas Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner San Antonio, Texas. San Antonio, Texas Summary of Reported Data (2.17 MB) More Documents & Publications Los Angeles Summary of Reported Data Virginia -- SEP Summary of Reported Data University Park Summary of Reported Data

  10. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rio Grande Rio Grande In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its flood plain. August 1, 2013 river bank Banks of the Rio Grande Groundwater at LANL discharges to springs along the Rio Grande. Stream flow resulting from heavy storms and snowmelt also has the potential to reach the Rio Grande. RELATED IMAGES http://farm3.staticflickr.com/2818/9628464665_3a972e1387_t.jpg Enlarge

  11. San Antonio, Texas: Solar in Action (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2011-10-01

    This brochure provides an overview of the challenges and successes of San Antonio, TX, a 2008 Solar America City awardee, on the path toward becoming a solar-powered community. Accomplishments, case studies, key lessons learned, and local resource information are given.

  12. Antonios Kelarakis > Sr. Researcher - University of Central Lancashire >

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center Alumni > The Energy Materials Center at Cornell Antonios Kelarakis Sr. Researcher - University of Central Lancashire antonios.kelarakis@gmail.com Dr. Kelarakis worked with the Giannelis Group while at Cornell. He has since joined the University of Central Lancashire, where he is a Senior Researcher/Guild Research Fellow with School of Forensic and Investigative Sciences. Antonio's research interests include colloids, biomaterials, smart coatings and nanostructured materials for

  13. Energy Department Recognizes San Antonio Area Partners for Advancing Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency | Department of Energy San Antonio Area Partners for Advancing Energy Efficiency Energy Department Recognizes San Antonio Area Partners for Advancing Energy Efficiency April 15, 2015 - 10:36am Addthis NEWS MEDIA CONTACT (202) 586-4940 As part of the Administration's effort to cut energy waste in the nation's buildings, the Energy Department will recognize San Antonio area partners today for their leadership in advancing energy efficiency. Through the Better Buildings Challenge,

  14. Texas: City of San Antonio Demonstrates Value of Greater Investments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Greater Investments in Clean Energy Texas: City of San Antonio Demonstrates Value ... in efficient and renewable energy and water conservation can create jobs and stimulate ...

  15. EECBG Success Story: San Antonio Small Businesses "Seeing the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency and Public Health KBK to the Trade San Antonio Small Businesses "Seeing the Light" with Energy Upgrades Weatherization & Intergovernmental Programs Office Home About...

  16. San Antonio, Texas Summary of Reported Data | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    San Antonio, Texas Summary of Reported Data (2.17 MB) More Documents & Publications Virginia -- SEP Summary of Reported Data Los Angeles Summary of Reported Data University Park ...

  17. Existing Whole-House Solutions Case Study: Build San Antonio Green, San Antonio, Texas

    SciTech Connect (OSTI)

    none,

    2013-06-01

    PNNL, FSEC, and CalcsPlus provided technical assistance to Build San Antonio Green on three deep energy retrofits. For this gut rehab they replaced the old roof with a steeper roof and replaced drywall while adding insulation, new HVAC, sealed ducts, transfer grilles, outside air run-time ventilation, new lighting and water heater.

  18. EERE Success Story-Texas: City of San Antonio Demonstrates Value...

    Office of Environmental Management (EM)

    Verde Center, installing a solar photovoltaic system at the San Antonio ... Addthis Related Articles The new photovoltaic system at the San Antonio International ...

  19. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its flood plain. August 1, ...

  20. Grand Challenges

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Challenges Grand Challenges Our goals to live a sustainable future LANL stakeholders TA-21 cleanup activities water on LANL land Collaborate with our stakeholders and tribal governments to ensure that LANL's impact on the environment is as low as reasonably achievable Remove or stabilize pollutants from the Manhattan Project and Cold War eras Protect water resource quality and reduce water use Stormwater drainage at LANL LANL land waste workers at LANL Eliminate industrial emissions,

  1. EECBG Success Story: New San Antonio Airport Terminal Generating Clean Power

    Broader source: Energy.gov [DOE]

    In early 2010, the City of San Antonio’s Energy Efficiency and Conservation Block Grant (EECBG) program staff quickly realized a golden opportunity lay right at their fingertips. The opening of the new San Antonio International Airport terminal was just months away and the team knew that a solar photovoltaic (PV) system at the airport would offer a highly visible location to showcase renewable energy technologies, help the city accelerate its “Mission Verde” sustainable development plan and create local jobs. Learn more.

  2. San Antonio_Jan1996_ExecSummary.pdf

    Office of Environmental Management (EM)

    San Antonio's City Lights program San Antonio's City Lights program Addthis KBK to the Trade 1 of 5 KBK to the Trade Thanks to the City Lights program, this design shop is saving an estimated 25,500 kilowatt-hours and $2,000 on electricity bills each year. | Photo Credit: City of San Antonio Date taken: 2011-05-24 15:06 Gallista Gallery 2 of 5 Gallista Gallery Joe Lopez, artist and owner of the Gallista Gallery, received energy and money-saving lights through the City Lights program. "We

  3. Interview of Antonio Vergara Fernandez about the First Beam

    ScienceCinema (OSTI)

    None

    2011-04-25

    Antonio Vergara Fernandez : Engineer of the LHC commissioning Questions asked : 1. What does it take to start up the LHC machine? 2. What's the plan for 1st injection day? 3. How do you feel about this?

  4. San Antonio Heights, California: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. San Antonio Heights is a census-designated place in San Bernardino County, California.1...

  5. San Antonio Better Buildings Partners Recognized for Advancing Energy Efficiency

    Broader source: Energy.gov [DOE]

    In April, the Energy Department recognized Better Buildings Challenge San Antonio, Texas area partners. Dr. Kathleen Hogan, Deputy Assistant Secretary for Energy Efficiency met with Macys and the...

  6. City of San Antonio, Texas (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name: San Antonio City of Place: Texas Phone Number: (210) 353-4357 or (800) 870-1006 Website: www.cpsenergy.comen.html Twitter: @cpsenergy Facebook:...

  7. Bike Sharing in Texas: San Antonio Rolls Out Program Aimed at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bike Sharing in Texas: San Antonio Rolls Out Program Aimed at Energy Efficiency and Public Health Bike Sharing in Texas: San Antonio Rolls Out Program Aimed at Energy Efficiency ...

  8. EERE Success Story-San Antonio Better Buildings Partners Recognized for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advancing Energy Efficiency | Department of Energy San Antonio Better Buildings Partners Recognized for Advancing Energy Efficiency EERE Success Story-San Antonio Better Buildings Partners Recognized for Advancing Energy Efficiency May 21, 2015 - 2:55pm Addthis In April, the Energy Department recognized Better Buildings Challenge San Antonio, Texas area partners. Dr. Kathleen Hogan, Deputy Assistant Secretary for Energy Efficiency met with Macy's and the San Antonio Housing Authority (SAHA),

  9. The Value of Distributed Solar Electric Generation to San Antonio

    SciTech Connect (OSTI)

    Jones, Nic; Norris, Ben; Meyer, Lisa

    2013-02-14

    This report presents an analysis of value provided by grid-connected, distributed PV in San Antonio from a utility perspective. The study quantified six value components, summarized in Table ES- 1. These components represent the benefits that accrue to the utility, CPS Energy, in accepting solar onto the grid. This analysis does not treat the compensation of value, policy objectives, or cost-effectiveness from the retail consumer perspective.

  10. City of San Antonio, Texas Better Buildings Program

    SciTech Connect (OSTI)

    Meyer, Liza C.; Hammer, Mary C.

    2014-06-30

    The San Antonio Better Buildings Program is a unified single-point-of-service energy efficiency delivery mechanism targeting residential, commercial, institutional, industrial and public buildings. This comprehensive and replicable energy efficiency program is designed to be an effective demand side management initiative to provide a seamless process for program participants to have turn-key access to expert analysis, support and incentives to improve the performance of their in-place energy using systems, while reducing electrical energy use and demand.

  11. Mission Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Statement Mission Statement Print ALS Mission Statement: "Support users in doing outstanding science in a safe environment."

  12. DOE - Office of Legacy Management -- Grand Junction Sites

    Office of Legacy Management (LM)

    Grand Junction Sites Grand Junction Sites gjmap Grand Junction Disposal Site Grand Junction Processing Site Grand Junction Site Contact Us

  13. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  14. San Antonio spurs increase in solar energy production

    Broader source: Energy.gov [DOE]

    They might always remember the Alamo, but such tourist attractions aren’t the only thing spurring growth in San Antonio — this Texas city is incorporating solar power into its diversified energy portfolio. In June, CPS Energy — the country’s largest municipally owned energy company (meaning profits contribute to the city’s annual budget) — signed a 20-year Power Purchase Agreement to develop a solar project using SunCatcher power systems. These large, concave bowls look like large satellite dishes. Not only will these systems help power Texas, but also they are designed to take advantage of tried-and-true automotive supply chains in the U.S. Rust Belt, using stamped sheet metal, which could help bring new life to manufacturers there.

  15. EERE Success Story-Texas: City of San Antonio Demonstrates Value of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greater Investments in Clean Energy | Department of Energy Texas: City of San Antonio Demonstrates Value of Greater Investments in Clean Energy EERE Success Story-Texas: City of San Antonio Demonstrates Value of Greater Investments in Clean Energy August 21, 2013 - 12:00am Addthis The City of San Antonio has a sound strategy in place to ensure that their Energy Efficiency and Conservation Block Grant (EECBG) projects are successful and viable in the long term. Each project was designed to

  16. New Whole-House Solutions Case Study: Imagine Homes, San Antonio, TX

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Founded in 2006, Imagine Homes of San Antonio has worked with DOE's Building America research team IBACOS to build more than 300 high-performance homes that achieve HERS energy efficiency scores from 52 to 65. Imagine Homes was also the first San Antonio builder to certify all of its homes to both the federal ENERGY STAR program and the Build San Antonio Green program. The local company has sold 77 homes per year over the last 4 years in a market flooded with just-to- code homes by national

  17. San Antonio Small Businesses "Seeing the Light" with Energy Upgrades |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy San Antonio Small Businesses "Seeing the Light" with Energy Upgrades San Antonio Small Businesses "Seeing the Light" with Energy Upgrades March 21, 2012 - 2:27pm Addthis KBK to the Trade 1 of 5 KBK to the Trade Thanks to the City Lights program, this design shop is saving an estimated 25,500 kilowatt-hours and $2,000 on electricity bills each year. | Photo Credit: City of San Antonio Date taken: 2011-05-24 15:06 Gallista Gallery 2 of 5 Gallista

  18. GRAND CHALLENGE PROBLEMS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GRAND CHALLENGE PROBLEMS Time is the biggest issue. Materials typically become critical in a matter of months, but solutions take years or decades to develop and implement. Our first two grand challenges address this discrepancy. Anticipating Which Materials May Go Critical In an ideal world, users of materials would anticipate supply-chain disruptions before they occur. They would undertake activities to manage the risks of disruption, including R&D to diversify and increase supplies or to

  19. San Antonio Area Middle School Regional Science Bowl | U.S. DOE Office of

    Office of Science (SC) Website

    Science (SC) San Antonio Area Middle School Regional Science Bowl National Science Bowl® (NSB) NSB Home About Regional Competitions Rules, Forms, and Resources High School Regionals Middle School Regionals National Finals Volunteers Key Dates Frequently Asked Questions News Media Contact Us WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 E: Email Us Middle School Regionals San Antonio

  20. Mission - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mission Mission & Goals The mission of the SRS Community Reuse Organization is to facilitate economic development opportunities associated with Savannah River Site technology, capabilities and missions and to serve as an informed, unified community voice for the five-county, two-state SRSCRO Region. Goals: To make the best use of excess and operating resources of the Savannah River Site for the economic well-being of the five-county area. The Asset Transition Program is a centerpiece of the

  1. Mountain View Grand | Open Energy Information

    Open Energy Info (EERE)

    Mountain View Grand Jump to: navigation, search Name Mountain View Grand Facility Mountain View Grand Sector Wind energy Facility Type Small Scale Wind Facility Status In Service...

  2. NERSC Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission NERSC Mission The mission of the National Energy Research Scientific Computing Center (NERSC) is to accelerate scientific discovery at the DOE Office of Science through high performance computing and data analysis. NERSC is the principal provider of high performance computing services to Office of Science programs - Magnetic Fusion Energy, High Energy Physics, Nuclear Physics, Basic Energy Sciences, Biological and Environmental Research, and Advanced Scientific Computing Research.

  3. Mission Statement

    Broader source: Energy.gov [DOE]

    Our mission is to remove environmental legacies resulting from more than 60 years nuclear weapons development and government-sponsored nuclear energy research.

  4. Best Practices Case Study: Imagine Homes - Stillwater Ranch, San Antonio, TX

    SciTech Connect (OSTI)

    none,

    2011-04-01

    This case study describes Imagine Homes, who met Builders Challenge criteria on more than 200 homes in San Antonio with rigid foam exterior sheathing, ducts and air handler in conditioned space in a spray-foam insulated attic, and high-efficiency HVAC, windows, and appliances.

  5. San Antonio, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This brochure provides an overview of the challenges and successes of San Antonio, TX, a 2008 Solar America City awardee, on the path toward becoming a solar-powered community. Accomplishments, case studies, key lessons learned, and local resource information are given.

  6. Mesa Grande Band of Mission Indians Tribal Energy Project Feasibility...

    Broader source: Energy.gov (indexed) [DOE]

    People 700 members today 130 living on Reservation 90% people on Reservation below poverty line Long waiting list of people wanting to live on Reservation Challenges Facing the ...

  7. PPPO Mission

    Broader source: Energy.gov [DOE]

    The Portsmouth/Paducah Project Office (PPPO) manages the DOE cleanup efforts at two gaseous diffusion plant sites – Portsmouth, Ohio, and Paducah, Kentucky. The PPPO mission is to...

  8. San_Antonio_Meeting_Summary_Jan1996.pdf

    Office of Environmental Management (EM)

    2008 - 2011 Energy Program Review & 2011 - 2012 ENERGY ORGANIZATION ANALYSIS Burden Basket San Carlos Apache Mission Statement The Apache People will live a balanced life in harmony with spirituality, culture, language, and family unity in an ever-changing world. The Apache People shall create a strategic framework for our tribe to grow and prosper. The Tribe and Reservation * 90 miles east of Phoenix. * 2,400' to 8,300'+. * 1.83 million acres. * 800,000+ acres wooded/forested. * 1M ac.

  9. 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist Team

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Submissions | Department of Energy Grand Winner and Grand Winner Finalist Team Submissions 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist Team Submissions Read the team submissions for the Grand Winner and Grand Winner Finalist teams from the 2015 Race to Zero Student Design Competition below. Learn more about the results of the 2015 competition. Grand Winner: Opti-MN, University of Minnesota (38.54 MB) Grand Winner Finalist: Team App, Appalachian State University (4.78

  10. Rio Grande North | Open Energy Information

    Open Energy Info (EERE)

    search Name Rio Grande North Facility Rio Grande North Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx...

  11. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January ...

  12. Grand Junction Office Founder Honored...

    Energy Savers [EERE]

    4 Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park Dedication and Open House The U.S. Department of Energy (DOE) Offce of Legacy Management (LM) held an ...

  13. Nuclear Proliferation and Grand Challenges

    SciTech Connect (OSTI)

    McCarthy, Kathy

    2009-01-01

    Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

  14. Nuclear Proliferation and Grand Challenges

    ScienceCinema (OSTI)

    McCarthy, Kathy

    2013-05-28

    Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

  15. CSES Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CSES CSES Mission Statement High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email Science Discipline Leaders Astrophysics & Cosmology Hui Li (505) 665-3131 Email Climate Keeley Costigan (505) 665-4788 Email Geophysics David Coblentz (505) 667-2781 Email Space Physics Geoffrey Reeves (505) 665-3877

  16. Mission | Department of Energy

    Office of Environmental Management (EM)

    Mission Mission OSDBU is building sustainable small businesses to enable the Department of Energy to achieve its mission, through innovation and creativity. Sections 8 and 15 of ...

  17. Mission | Department of Energy

    Office of Environmental Management (EM)

    structured to accomplish departmental missions Implements departmental policy ... legacy waste and changing departmental missions Actively acts as liaison and coordinates ...

  18. SU(6) grand unified model

    SciTech Connect (OSTI)

    Dong, J.X.

    1986-03-14

    A model of grand unified theory based on SU(6) gauge group is proposed. It can accommodate two generations of ordinary fermions with V-A weak coupling and two generations of weird fermions with V+A weak coupling. In this model, a new discrete symmetry is introduced that insures existence of fermions with lower masses when SU(6) gauge symmetry is spontaneously broken. Simple Higgs fields with appropriate vacuum expectation values are chosen, so that the masses of weird fermions are heavier than those of ordinary fermions. This model also gives the same value of Weinberg angle, sin sq of Theta/sub w/ = 3/8, as in the usual SU(5) grand unified model at the grand unified scale.

  19. Annual Inspection of the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    6 Annual Inspection - Grand Junction, Colorado, Office Site April 2016 Page 1 Annual Inspection of the Grand Junction, Colorado, Site 1.1 Inspection Summary The Grand Junction, ...

  20. Grand Junction, Colorado, Site Fact Sheet

    Office of Legacy Management (LM)

    D D&D Page 1 of 3 Fact Sheet Grand Junction, Colorado, Site This fact sheet provides information about the Grand Junction, Colorado, Site. This site is managed by the U.S. ...

  1. DOE Grand Junction Projects Office Edgemont LTSP

    Office of Legacy Management (LM)

    DOE Grand Junction Projects Office Edgemont LTSP June 1996 Page ii Contents Page 1.0 Introduction ......

  2. DOE Selects Mission Support Alliance, LLC for Mission Support...

    Office of Environmental Management (EM)

    Mission Support Alliance, LLC for Mission Support Contract at its Hanford Site DOE Selects Mission Support Alliance, LLC for Mission Support Contract at its Hanford Site September ...

  3. Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission Mission To strengthen the integrity, economy, and efficiency of the Department's programs and operations. Vision Statement To be a highly effective organization that promotes positive change.

  4. Mission | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    HUMAN CAPITAL MISSION AND VISION Mission: The Office of the Chief Human Capital Officer (OCHCO) provides effective leadership on policies, programs, and partnerships related to all ...

  5. Mississippi Nuclear Profile - Grand Gulf

    U.S. Energy Information Administration (EIA) Indexed Site

    Grand Gulf" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,"1,251","9,643",88.0,"BWR","application/vnd.ms-excel","application/vnd.ms-excel" ,"1,251","9,643",88.0 "Data for 2010" "BWR = Boiling Water Reactor."

  6. EV Everywhere Grand Challenge Blueprint

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to enable plug-in electric vehicles (PEVs) that are as affordable and convenient for the American family as gasoline-powered vehicles by 2022. I am more convinced now than ever that we can capture this opportunity, and I am committed to making the strategic investments necessary to get there. These investments will: 1) improve the competitive position of U.S.

  7. Mission & Vision

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission & Vision Mission & Vision Advancing National Security Science while Protecting the Environment Charles McMillan Charles McMillan Laboratory Director's Mission As The Laboratory delivers on our commitments today while ensuring capabilities for an uncertain future, we are more invested than ever in making site sustainability a part of that approach. Sustainability isn't just part of our mission, it is our mission. The sustainability of the nuclear stockpile, of global security, and

  8. Destilaria Rio Grande | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name: Destilaria Rio Grande Place: Fronteira, Minas Gerais, Brazil Zip: 38230-000 Product: Brazil based ethanol producer. References: Destilaria Rio...

  9. Usina Serra Grande | Open Energy Information

    Open Energy Info (EERE)

    navigation, search Name: Usina Serra Grande Place: Maceio, Alagoas, Brazil Product: Ethanol producer Coordinates: -9.666479, -35.734954 Show Map Loading map......

  10. EV Everywhere Grand Challenge - Charging Infrastructure Enabling...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Framing Workshop Report Out & Lessons Learned EV Everywhere Grand ...

  11. Hydrogen Storage Grand Challenge Individual Projects

    Broader source: Energy.gov [DOE]

    Hydrogen Storage Grand Challenge individual projects funded for three Centers of Excellence, led by the National Renewable Energy Laboratory, Sandia National Laboratories, and Los Alamos National Laboratory

  12. EV Everywhere Grand Challenge - Battery Workshop Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...2012 EV Everywhere Grand Challenge -- Battery Workshop Thursday, July 26, 2012 - ... Technologies Program 9:25-9:50 AM EV BATTERY TECHNOLOGY-CURRENT STATUS & COST ...

  13. PP-33 Rio Grande Electric Cooperative Inc

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing Grande Electric Cooperative Inc to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border.

  14. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 9 PDF icon grandchallengesportfoliopg9.pdf More Documents & Publications ...

  15. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 8 PDF icon grandchallengesportfoliopg8.pdf More Documents & Publications ...

  16. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 6 PDF icon grandchallengesportfoliopg6.pdf More Documents & Publications ...

  17. EV Everywhere Grand Challenge Overview Presentation

    Broader source: Energy.gov [DOE]

    Presentation by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI

  18. Grand River Dam Authority | Open Energy Information

    Open Energy Info (EERE)

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  19. 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist...

    Broader source: Energy.gov (indexed) [DOE]

    Learn more about the results of the 2015 competition. PDF icon Grand Winner: Opti-MN, University of Minnesota PDF icon Grand Winner Finalist: Team App, Appalachian State University ...

  20. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Grand Canyon National Park

    SciTech Connect (OSTI)

    Stephen Schey; Jim Francfort; Ian Nienhueser

    2014-08-01

    This report focuses on the Grand Canyon National Park (GCNP) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively PEVs) can fulfill the mission requirements.

  1. ORP Mission - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Office of River Protection About ORP ORP Mission ORP Team Message from the Manager ORP Projects & Facilities Newsroom Contracts & Procurements Contact ORP ORP Mission Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Recah & Columbia River Panorama Our Mission To safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and

  2. Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission Mission The mission of the Office of the Chief Information Officer (OCIO) is to enable the Department of Energy's urgent missions in energy, science and nuclear security through the power of information and technology in a manner that balances risk with required outcomes in programs that span from open science to national security. OCIO Strategic Plan Vision, Leadership and Commitment...Enabling the Future through Technology and Information

  3. Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission Mission The mission of the U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is to maximize the development and deployment of energy solutions for the benefit of American Indians and Alaska Natives. The Office works within DOE, across government agencies, and with Indian tribes and organizations to promote Indian energy policies and initiatives. The Office of Indian Energy performs these functions within the scope of DOE's mission and consistently with the

  4. Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission Mission Our mission is to remove environmental legacies resulting from more than 60 years nuclear weapons development and government-sponsored nuclear energy research. Each of Oak Ridge's three primary cleanup sites face unique challenges that threaten safety and hinder the Department's missions. Protecting the Region's Health and Environment Our employees understand that their progress enhances the health and safety of the region. At ETTP, we are removing contaminated facilities. At

  5. City of Grand Marais, Minnesota (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Grand Marais Place: Minnesota Phone Number: (218) 387-3030 or (218)387-1848 Website: www.ci.grand-marais.mn.usinde Facebook: https:www.facebook.comGrandMaraisMN Outage Hotline:...

  6. 2014 Race to Zero Student Design Competition: Grand Winner Teams...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams, from the U.S. Department of ...

  7. EA-33 Rio Grande Electric | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-33 Rio Grande Electric Order authorizing Rio Grande Electric to export electric energy to Mexico PDF icon EA-33 Rio Grande Electric More Documents & Publications EA-33-A and ...

  8. EV Everywhere Grand Challenge Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2_danielson_caci.pdf (299.97 KB) More Documents & Publications EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV Everywhere Grand Challenge Overview EV Everywhere Battery Workshop: Setting the Stage for the EV Everywhere Grand Challenge

  9. NEET Mission | Department of Energy

    Energy Savers [EERE]

    NEET Mission NEET Mission The mission of the Nuclear Energy Enabling Technologies (NEET) program is to develop crosscutting technologies that directly support and complement the ...

  10. Defining the Mechanisms of Friction: A Grand Challenge in Interfacial...

    Office of Scientific and Technical Information (OSTI)

    Defining the Mechanisms of Friction: A Grand Challenge in Interfacial Mechanics. Citation Details In-Document Search Title: Defining the Mechanisms of Friction: A Grand Challenge...

  11. Winning the Future: Grand Ronde Solar Projects Reduce Pollution...

    Energy Savers [EERE]

    Grand Ronde Solar Projects Reduce Pollution, Cut Costs Winning the Future: Grand Ronde Solar Projects ... to develop renewable energy projects and implement energy efficiency measures. ...

  12. Preservationists Tour Historic Log Cabin at the Grand Junction...

    Office of Environmental Management (EM)

    Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office April 19, 2016 - ...

  13. Grand Junction Office Founder Honored at the Philip C. Leahy...

    Office of Environmental Management (EM)

    Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park Dedication and Open House Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park ...

  14. Students from Grand Junction High School Triumph in Colorado...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Junction High School Triumph in Colorado Science Bowl For more information contact: e:mail: Public Affairs Golden, Colo., Feb. 12, 2000 - Students from Grand Junction High ...

  15. EV Everywhere EV Everywhere Grand Challenge - Electric Drive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop Agenda EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power ...

  16. Rio Grande Rift Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Region Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al., 2010) Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) Magnetotellurics At...

  17. East Grand St Bridge Snowmelt Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Jump to: navigation, search Name East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Facility East...

  18. Agropecuaria e Industrial Serra Grande | Open Energy Information

    Open Energy Info (EERE)

    e Industrial Serra Grande Jump to: navigation, search Name: Agropecuaria e Industrial Serra Grande Place: So Raimundo das Mangabeiras, Maranhao, Brazil Product: Privately owned...

  19. Wintertime meteorology of the Grand Canyon region

    SciTech Connect (OSTI)

    Whiteman, C.D.

    1992-09-01

    The Grand Canyon region of the American Southwest is an interesting region meteorologically, but because of its isolated location, the lack of major population centers in the region, and the high cost of meteorological field experiments, it has historically received little observational attention. In recent years, however, attention has been directed to episodes of visibility degradation in many of the US National parks, and two recent field studies focused on this visibility problem have greatly increased the meteorological data available for the Grand Canyon region. The most recent and comprehensive of these studies is the Navajo Generating Station Winter Visibility Study of 1989--90. This study investigated the sources of visibility degradation in Grand Canyon National Park and the meteorological mechanisms leading to low visibility episodes. In this paper we present analyses of this rich data set to gain a better understanding of the key wintertime meteorological features of the Grand Canyon region.

  20. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gates Replacement This project is part of the Third Powerplant overhaul at Grand Coulee Dam. The full overhaul effort involves a mechanical overhaul of units G19 - G24. The...

  1. CMI Grand Challenge Problems | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CMI Grand Challenge Problems Time is the biggest issue. Materials typically become critical in a matter of months, but solutions take years or decades to develop and implement. Our first two grand challenges address this discrepancy. Anticipating Which Materials May Go Critical In an ideal world, users of materials would anticipate supply-chain disruptions before they occur. They would undertake activities to manage the risks of disruption, including R&D to diversify and increase supplies or

  2. Mission, Vision, Values

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Energy.gov » Mission Mission The mission of the Energy Department is to ensure America's security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. Energy Catalyze the timely, material, and efficient transformation of the nation's energy system and secure U.S. leadership in clean energy technologies. Learn more Topics Energy Economy Energy Efficiency Energy Sources Energy Usage Science & Innovation

  3. JCAP Mission - JCAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    51_v3.jpg JCAP Mission Who We Are JCAP Mission JCAP At A Glance Fact Sheets Organizational Chart Recent Science Technology Transfer Awards & Honors Senior Management Scientific Leadership Researchers Governance & Advisory Boards Operations & Administration Who we are Overview JCAP Mission JCAP At A Glance Fact Sheets Organizational Chart Our Achievements Recent Science Technology Transfer Awards & Honors Our People Senior Management Scientific Leadership Researchers Governance

  4. Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission Mission The Office of Economic Impact and Diversity develops and executes Department-wide policies to implement applicable legislation and Executive Orders that strengthen diversity and inclusion goals affecting equal employment opportunities, small and disadvantaged businesses, minority educational institutions, and historically under-represented communities. Our mission is to identify and implement ways of ensuring that everyone is afforded an opportunity to participate fully in the

  5. Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission Mission The Mission of the Office of Management is to provide the Department of Energy with centralized direction and oversight for the full range of management, procurement and administrative services. Project Management Project Management Awardees The Office of Management's activities include project and contract management, cost estimating, and policy development and oversight, One of the principal outcomes in exercising this responsibility is the delivery of projects on schedule,

  6. Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About Energy.gov » Mission Mission The mission of the Energy Department is to ensure America's security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. Energy Catalyze the timely, material, and efficient transformation of the nation's energy system and secure U.S. leadership in clean energy technologies. Learn more Topics Energy Economy Energy Efficiency Energy Sources Energy Usage Science & Innovation

  7. Sandia's Nuclear Weapons Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Weapons Mission Ensuring that the nation's stockpile is safe, secure and effective, and that it meets military requirements America's Nuclear Weapons Systems Engineering ...

  8. EV Everywhere Grand Challenge - Battery Workshop Agenda | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Agenda EV Everywhere Grand Challenge - Battery Workshop Agenda Agenda for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL. agenda_b.pdf (196.97 KB) More Documents & Publications EV Everywhere Grand Challenge - Charge to the Breakout Groups EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV Everywhere Grand Challenge Kick-Off

  9. EV Everywhere Grand Challenge - Battery Workshop attendees list |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy attendees list EV Everywhere Grand Challenge - Battery Workshop attendees list Attendance list for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree OHare, Chicago, IL. companies_in_attendance_b.pdf (149.45 KB) More Documents & Publications EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge Overview EV Everywhere Grand Challenge Introduction for

  10. EECBG Success Story: San Antonio Small Businesses "Seeing the Light" with Energy Upgrades

    Broader source: Energy.gov [DOE]

    As part of San Antonio’s “Mission Verde” initiative, the city launched the City Lights Small Business Lighting Retrofit Program using Recovery Act funding through the Energy Department’s Energy Efficiency and Conservation Block Grant (EECBG) program. Learn more.

  11. Space Nuclear MIssion History

    Office of Energy Efficiency and Renewable Energy (EERE)

    For over fifty years, the Department of Energy has enabled space exploration on 27 missions by providing safe reliable radioistope power systems and radioisotope heater units for NASA, Navy, Air...

  12. ARM - Mission Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Summary Related Links ISDAC Home AAF Home AVP Aircraft Instrumentation, October 14-16, 2008 ARM Data Discovery Browse Data Post-Campaign Data Sets Flight Summary Table (PDF, 440K) ISDAC Wiki Mission Summary Journal Deployment Resources NSA Site ARM Data Plots Quick Links Experiment Planning ISDAC Proposal Abstract Full Proposal (pdf, 1,735K) Science Questions Science Overview Document for ISDAC (pdf, 525K) ISDAC Flight Planning Document (PDF, 216K) Collaborations Logistics Measurements

  13. CNEEC - Mission Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Welcome to the Center on Nanostructuring for Efficient Energy Conversion (CNEEC). Concept of the integrated center The Center on Nanostructuring for Efficient Energy Conversion (CNEEC) based at Stanford University is one of forty-six Energy Frontier Research Centers (EFRCs) across the nation established in 2009 and funded by the U.S. Department of Energy's Office of Basic Science in the Office of Science. Mission Statement Understand how nanostructuring can enhance efficiency for energy

  14. Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission Mission National Environmental Policy Act of 1969 (NEPA) NEPA is our basic national charter for protection of the environment. Signed into law by President Richard Nixon on January 1, 1970, NEPA was established to foster and promote the general welfare, to create and maintain conditions under which man and nature can exist in productive harmony, and fulfill the social, economic, and other requirements of present and future generations of Americans. NEPA establishes policy, sets goals

  15. Future missions require improving LANSCE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Future missions require improving LANSCE capabilities to support five principal research ... Science Critical to DOE and NNSA Missions for Over 35 Years Hydrodynamics with Proton ...

  16. Middle Rio Grande Cooperative Water Model

    Energy Science and Technology Software Center (OSTI)

    2005-11-01

    This is computer simulation model built in a commercial modeling product Called Studio Expert, developed by Powersim, Inc. The simulation model is built in a system dynamics environment, allowing the simulation of the interaction among multiple systems that are all changing over time. The model focuses on hydrology, ecology, demography, and economy of the Middle Rio Grande, with Water as the unifying feature.

  17. Energy Secretary Steven Chu to Attend Grand Opening of Recovery...

    Energy Savers [EERE]

    to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant ...

  18. DOE/EIS-0485 Final Environmental Impact Statement Grande Prairie...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grande Prairie Wind has applied to Western to interconnect the proposed Project to Western's 345-kilovolt (kV) Fort Thompson to Grand Island transmission line at a new switchyard. ...

  19. GreenHunter Biodiesel Refinery Grand Opening | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening June 2, 2008 - 12:51pm Addthis Remarks as Prepared for (Acting) Deputy Secretary Kupfer ...

  20. SunShot Grand Challenge Summit Breakout Sessions Announced

    Broader source: Energy.gov [DOE]

    The 2014 SunShot Grand Challenge Summit is only six weeks away! SunShot is excited to announce our thought-provoking lineup of Grand Challenge Breakout Sessions.

  1. City of Grand Haven, Michigan (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Grand Haven Place: Michigan Phone Number: (616) 846-6250 Website: www.ghblp.org Twitter: @ghblp Facebook: https:www.facebook.comGrandHavenBLP Outage Hotline: (616) 842-2241...

  2. Rio Grande LNG LLC- Dkt. No. 15-190-LNG

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Fossil Energy gives notice of receipt of an Application filed December 23, 2015, by Rio Grande LNG, LLC (Rio Grande), seeking a long-term multi-contract authorization to export...

  3. Grand Challenges | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Science Highlights News & Events Publications History Grand Challenges BES Reports Document Archives Contests Contact BES Home History Grand Challenges Print Text Size: A A A FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored

  4. Grand Challenges | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Grand Challenges BES Reports Science Highlights News & Events Publications History Contact BES Home Research Grand Challenges Print Text Size: A A A FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored workshops that began in 2001.

  5. PP-53 Rio Grande Electric Cooperative, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Rio Grande Electric Cooperative, Inc. PP-53 Rio Grande Electric Cooperative, Inc. Presidential Permit authorizing Rio Grande Electric Cooperative, Inc.to construct, operate, and maintain electric transmission facilities at the U.S. - Mexico Border. PP-53 Rio Grande Electric Cooperative, Inc. (1.09 MB) More Documents & Publications PP-55 Roseau Electric Cooperative, Inc. PP-42 Roseau Electric Cooperative, Inc. PP-67 North Central Electric Cooperative, Inc.

  6. Grand Junction, Colorado, Processing Site and Disposal Sites Fact Sheet

    Office of Legacy Management (LM)

    Grand Junction, Colorado, Disposal and Processing Sites This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act of 1978 Title I disposal and processing sites at Grand Junction, Colorado. These sites are managed by the U.S. Department of Energy Office of Legacy Management. Locations of the Grand Junction, Colorado, Sites Site Description and History The former Grand Junction processing site, historically known as the Climax uranium mill, sits at an elevation of

  7. Winners Announced for the NNSA Grand Challenge Competition

    Broader source: Energy.gov [DOE]

    Clark Atlanta University students' rocket tail component for Additive Manufacturing won the NNSA student Grand Challenge Competition.

  8. EV Everywhere Grand Challenge - Charge to the Breakout Groups | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Charge to the Breakout Groups EV Everywhere Grand Challenge - Charge to the Breakout Groups Presentation given at the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree OHare, Chicago, IL. 7_howell_b.pdf (796.65 KB) More Documents & Publications EV Everywhere - Charge to Breakout Sessions EV Everywhere Grand Challenge - Battery Workshop Agenda EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric

  9. 2014 Race to Zero Student Design Competition: Grand Winner Teams |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams, from the U.S. Department of Energy. rtz_grand_winner_team_rosters.pdf (59.94 KB) More Documents & Publications 2014 Race to Zero Student Design Competition: Montage Builders Team Submission 2014 Race to Zero Student Design Competition: Montage Builders Profile 2014 Race to Zero Student Design Competition: Auburn

  10. Hydrogen Storage Grand Challenge Centers of Excellence | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Centers of Excellence Hydrogen Storage Grand Challenge Centers of Excellence DOE's Hydrogen Storage Grand Challenge Centers of Excellence and partners, led by NREL, SNL, and LANL grand_challenge_centers.pdf (62.21 KB) More Documents & Publications Hydrogen Storage Grand Challenge Individual Projects Final Solar and Wind H2 Report EPAct 812.doc Microsoft Word - H2 National Release 2.doc

  11. EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado.

  12. Mission Support Alliance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracting Mission Support Alliance Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Hanford Fire Department Washington Closure Hanford HPM Corporation (HPMC) Wastren Advantage, Inc. Bechtel National, Inc. Washington River Protection Solutions Mission Support Alliance Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Mission Support Alliance (MSA) logo Mission Support Alliance

  13. SunShot Grand Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Grand Challenge SunShot Grand Challenge Addthis SunShot Grand Challenge 1 of 28 SunShot Grand Challenge Participants gather for the plenary session at the SunShot Grand Challenge Summit and Technology Forum in Denver, Colorado. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:10 Arun Majumdar, Founding Director, ARPA-E 2 of 28 Arun Majumdar, Founding Director, ARPA-E Arun Majumdar, Founding Director, ARPA-E gives the welcoming remarks. (Photo by DENNIS SCHROEDER / NREL) Date

  14. Upper Rio Grande Simulation Model (URGSIM)

    Energy Science and Technology Software Center (OSTI)

    2010-08-05

    URGSIM estimates the location of surface water and groundwater resources in the upper Rio Grande Basin between the Colorado-New Mexico state line, and Caballo Reservoir from 1975 - 2045. It is a mass balance hydrology model of the Upper Rio Grande surface water, groundwater, and water demand systems which runs at a monthly timestep from 1975-1999 in calibration mode, 2000 – 2004 in validation mode, and 2005 – 2045 in scenario analysis mode.

  15. Rio Grande pipeline introduces LPG to Mexico

    SciTech Connect (OSTI)

    1997-06-01

    Rio Grande Pipeline, a joint venture between Mid-America Pipeline Co., Amoco Pipeline Co. and Navajo Pipeline Co., has broken new ground in the energy industry as the first LPG pipeline to cross the US-Mexico border. Plans for the project were announced in November 1995 and first deliveries started three months ago on March 21, 1997. The 8-inch, 265-mile pipeline originates near Odessa, TX, where it receives an 85-15 propane-butane mix via a connection to Mid-America Pipeline. From Odessa, product moves west through the Texas desert and crosses the Rio Grande River about 15 miles south of El Paso near Clint, TX and extends 20 miles into Mexico. Capacity of the line is 24,000 bpd and it has been averaging about 22,000 bpd since line-fill. All in all, it sounded like a reasonably feasible, routine project. But perceptions can be deceiving, or at least misleading. In other words, the project can be summarized as follows: one river, two cultures and a world of difference. The official border crossing for pipeline construction took place on Dec. 2, 1996, with a directional drill under the Rio Grande River, but in actuality, the joint venture partners were continually bridging differences in language, laws, customs and norms with Pemex and contracted workers from Mexico.

  16. Raptor Use of the Rio Grande Gorge

    SciTech Connect (OSTI)

    Ponton, David A.

    2015-03-20

    The Rio Grande Gorge is a 115 km long river canyon located in Southern Colorado (15 km) and Northern New Mexico (100 km). The majority of the canyon is under the administration of the Bureau of Land Management {BLM), and 77 km of the canyon south of the Colorado/New Mexico border are designated Wild River under the National Wild and Scenic Rivers Act of 1968. Visits I have made to the Rio Grande Gorge over the past 15 .years disclosed some raptor utilization. As the Snake River Birds of Prey Natural Area gained publicity, its similarity to the Rio Grande Gorge became obvious, and I was intrigued by the possibility of a high raptor nesting density in the Gorge. A survey in 1979 of 20 km of the northern end of the canyon revealed a moderately high density of red-tailed hawks and prairie falcons. With the encouragement of that partial survey, and a need to assess the impact of river-running on nesting birds of prey, I made a more comprehensive survey in 1980. The results of my surveys, along with those of a 1978 helicopter survey by the BLM, are presented in this report, as well as general characterization of the area, winter use by raptors, and an assessment of factors influencing the raptor population.

  17. ARM - Mission Summary Journal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Summary Journal Related Links CLASIC Home AAF Home ARM Data Discovery Browse Data Post-Campaign CLASIC/CHAPS Special Session at AGU Annual Meeting, December 15-19 CLASIC Workshop, March 26-27 Data Sets Deployment Resources Measurement Platforms PNNL WRF-CuP Forecast Cloud Physics Lidar MODIS Airborne Simulator Data Mesonet Monitoring ARM Data Plots Experiment Planning CLASIC Proposal Abstract Science Questions Science and Implementation Plan (pdf) Measurement Platforms (pdf) CLASIC-Land

  18. ORISE: Mission and Vision

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission and Vision The Oak Ridge Institute for Science and Education (ORISE) is a U.S. Department of Energy (DOE) institute managed by ORAU. ORISE addresses national needs by: Assessing and analyzing environmental and health effects of radiation, beryllium and other hazardous materials; Maintaining medical and national security radiation emergency management and response capabilities; and Managing education programs to help ensure a robust supply of scientists, engineers and technicians to meet

  19. Mission Need Statement

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-20

    This Guide provides authors of mission need statements, as identified in DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06 with suggested content, definitions, and examples for writing a clear statement to support an acquisition executive's decision to initiate exploration of options to fulfill a capability gap, which may include a capital asset acquisition.

  20. NPS Mission | Open Energy Information

    Open Energy Info (EERE)

    Mission Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: NPS Mission Author National Park Service Published National Park Service, Date Not Provided DOI...

  1. DOE - Office of Legacy Management -- Climax Uranium Co Grand Junction Mill

    Office of Legacy Management (LM)

    - CO 0-03 Climax Uranium Co Grand Junction Mill - CO 0-03 FUSRAP Considered Sites Site: Climax Uranium Co. (Grand Junction Mill) (CO.0-03) Licensed to DOE for long-term custody and managed by the Office of Legacy Management. Designated Name: Grand Junction, Colorado, Processing Site Alternate Name: Climax Uranium Company (Grand Junction Mill) Grand Junction Uranium Mill Tailings Remedial Action Site Climax Mill Site Grand Junction Mill 1 Location: Grand Junction, Colorado Evaluation Year:

  2. 2012 Annual Inspection Report for the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    Annual Inspection - Grand Junction, Colorado, Site March 2012 Page 1 2012 Annual Inspection Report for the Grand Junction, Colorado, Site Summary The Grand Junction, Colorado, Site was inspected on February 23, 2012, and was in excellent condition. Physical and institutional controls enacted at the site continue to be effective in preventing exposure to contamination remaining on the property. A 5-year deficiency-based inspection of all real property assets in compliance with DOE Order 430.1B

  3. 2013 Annual Inspection Report for the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    Annual Inspection - Grand Junction, Colorado, Site April 2013 Page 1 2013 Annual Inspection Report for the Grand Junction, Colorado, Site Summary The Grand Junction, Colorado, Site was inspected on March 4, 2013, and was in excellent condition. Physical and institutional controls enacted at the site continue to be effective in preventing exposure to contamination remaining on the property. No cause for a follow-up inspection was identified. 1.0 Introduction This report presents the results of

  4. Annual Inspection of the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    Grand Junction, Colorado, Office Site March 2014 Page 1 Annual Inspection of the Grand Junction, Colorado, Site 1.1 Inspection Summary The Grand Junction, Colorado, Site was inspected on February 19, 2014, and was in excellent condition. Physical and institutional controls enacted at the site continue to be effective in preventing exposure to contamination remaining on the property. No maintenance needs were identified and no cause for a follow-up inspection was identified. The site was

  5. Annual Inspection of the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    Grand Junction, Colorado, Office Site March 2015 Page 1 Annual Inspection of the Grand Junction, Colorado, Site 1.1 Inspection Summary The Grand Junction, Colorado, Site was inspected on February 18, 2015, and was in good condition. Physical and institutional controls enacted at the site continue to be effective in preventing exposure to contamination remaining on the property. Two minor maintenance needs were identified; however, no cause for a follow-up inspection was identified. The site was

  6. Saft America Advanced Batteries Plant Celebrates Grand Opening in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jacksonville | Department of Energy Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville September 16, 2011 - 12:30pm Addthis Department of Energy Investment Helps Support Job Creation, U.S. Economic Competitiveness and Advanced Vehicle Industry WASHINGTON, D.C. - Today, Secretary Steven Chu joined with Saft America to announce the grand opening of the company's Jacksonville, Florida,

  7. SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Signals in the Subsurface | Department of Energy SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface Grand Challenge Workshop -Imaging Subsurface.pdf (434.52 KB) More Documents & Publications AGU SubTER Town Hall Presentation 2015 SubTER Presentation at Town Hall - American Geophysical Union Controlling Subsurface Fractures and Fluid Flow: A Basic

  8. EV Everywhere Grand Challenge: Consumer Acceptance and Charging

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Workshop Agenda | Department of Energy Agenda EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Agenda Agenda for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA agenda_caci.pdf (218.57 KB) More Documents & Publications EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop - Backsplash EV Everywhere Grand Challenge:

  9. DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational

  10. Rio Grande County, Colorado: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    B. Places in Rio Grande County, Colorado Center, Colorado Del Norte, Colorado Monte Vista, Colorado South Fork, Colorado Retrieved from "http:en.openei.orgw...

  11. Sandia Energy - SunShot Grand Challenge: Regional Test Centers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Challenge: Regional Test Centers Home Videos Renewable Energy Energy Events News SunShot News & Events Photovoltaic Solar SunShot Grand Challenge: Regional Test Centers Previous...

  12. EV Everywhere Grand Challenge Kick-Off | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dearborn, MI framingworkshopagenda062112.pdf (85.02 KB) More Documents & Publications EV Everywhere Grand Challenge Overview Presentation EV Everywhere Framing Workshop - ...

  13. EV Everywhere Grand Challenge- Battery Status and Cost Reduction Prospects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by technology manager David Howell at the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL.

  14. Grand Blanc, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    5th congressional district.12 Registered Energy Companies in Grand Blanc, Michigan 21st century Green Solutions LLC References US Census Bureau Incorporated place and...

  15. EV Everywhere Grand Challenge: Consumer Acceptance and Charging...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon ...

  16. EV Everywhere Grand Challenge: Consumer Acceptance and Charging...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon ...

  17. Statement by Energy Secretary Steven Chu on Today's Grand Opening...

    Energy Savers [EERE]

    on today's grand opening of the Nordex wind turbine manufacturing facility in Jonesboro. ... to assist in the creation of a wind turbine manufacturing facility in Jonesboro, Arkansas. ...

  18. Field Studies of Geothermal Reservoirs: Rio Grande Rift, New...

    Open Energy Info (EERE)

    Abstract The Rio Grande rift provides an excellent field laboratory to study the nature of geothermal systems in an extensional environment. Much of the geologic complexity...

  19. Grand Opening of Abengoa's Biorefinery: Nation's Third Commercial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The nation's third commercial-scale cellulosic ethanol biorefinery celebrates its grand ... The plant will produce cellulosic ethanol from non-edible corn stalks, stems, and leaves ...

  20. EV Everywhere Grand Challenge Introduction for Electric Drive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation given by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, ...

  1. EV Everywhere Grand Challenge - Electric Drive (Power Electronics...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop List of ...

  2. Grand Junction, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    district.12 Registered Energy Companies in Grand Junction, Colorado Ruby Canyon Engineering Inc References US Census Bureau Incorporated place and minor civil...

  3. Alpine Extensional Detachment Tectonics In The Grande Kabylie...

    Open Energy Info (EERE)

    Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Jump to: navigation, search OpenEI Reference LibraryAdd to...

  4. Winning the Future: Grand Ronde Solar Projects Reduce Pollution...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    coastal range, the Confederated Tribes of the Grand Ronde Community of Oregon has a strong connection to the earth and nature and a deep commitment to environmental stewardship. ...

  5. Grand Rapids Public Util Comm | Open Energy Information

    Open Energy Info (EERE)

    https:www.facebook.compagesGrand-Rapids-Public-Utilities108782819203449?skwall Outage Hotline: 218-326-4806 References: EIA Form EIA-861 Final Data File for 2010 -...

  6. Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Spa Low Temperature Geothermal Facility Facility Sierra Grande Lodge Sector Geothermal energy Type Pool and Spa Location Truth or Consequences, New Mexico Coordinates 33.1284047,...

  7. City of Grand Junction, Iowa (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Iowa (Utility Company) Jump to: navigation, search Name: Grand Junction Municipal Utilities Place: Iowa Phone Number: (515) 738-2285 or (515) 738-2726 Facebook: https:...

  8. Summary of Grand Challenge Products Selected for Award Negotiations

    SciTech Connect (OSTI)

    2010-04-26

    DOE provides $13 million in funding to 48 research and development projects across the country that were selected as award winners of the Industrial Energy Efficiency Grand Challenge.

  9. Mission Support Alliance, LLC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 3, 2015 Mr. William Johnson President Mission Support Alliance, LLC 2490 Garlick Boulevard P.O. Box 650 Richland, Washington 99352 WEL-2015-07 Dear Mr. Johnson: The Office of Enterprise Assessments' Office of Enforcement has completed an evaluation of an incident involving a rigger injured during a crane re-spooling operation, as reported into the Department of Energy's (DOE) Occurrence Reporting and Processing System under EM-RL--MSC-FSS-2015-0002 on May 11, 2015. On May 1, 2015, a

  10. EERE Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Mission EERE Mission The mission of the Office of Energy Efficiency and Renewable Energy (EERE) is to create and sustain American leadership in the transition to a global clean energy economy. Its vision is a strong and prosperous America powered by clean, affordable and secure energy. Renewable Electricity Generation Image of two workers installing solar panels. EERE plays a key role in advancing America's "all of the above" energy strategy, leading a large network of researchers

  11. Mission Motors | Open Energy Information

    Open Energy Info (EERE)

    External resources Los Angeles Times Auto Blog Autobloggreen Treehugger.com Autopia (Wired) References "Mission Motors: Contact" Retrieved from "http:en.openei.orgw...

  12. Nuclear Weapons Mission at Sandia

    SciTech Connect (OSTI)

    2015-03-12

    Take a rare “tour” of Sandia National Laboratories’ nuclear weapons work and see the strong, multidisciplinary relationship between all of Sandia’s missions and capabilities.

  13. Mission | APS Engineering Support Division

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mission, the APS Engineering Support Division provides: Highly reliable, state-of-the-art computer infrastructure to meet the needs of the APS. Leading-edge information...

  14. Data Compendium for the Logging Test Pits at the ERDA Grand Junction...

    Office of Environmental Management (EM)

    Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound (December 1975) Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound ...

  15. EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project...

    Office of Environmental Management (EM)

    19: Rio Grande LNG Project and Rio Bravo Pipeline Project; Kleberg, Kenedy, Willacy, and Cameron Counties, Texas EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project; ...

  16. Lessons Learned: The Grand Junction Office Site Transfer to Private Ownership

    SciTech Connect (OSTI)

    none,

    2001-02-01

    The U.S. Department of Energy Grand Junction Office (DOE-GJO) in Grand Junction, Colorado, has played an integral role within the DOE complex for many years. GJO has a reputation for outstanding quality in the performance of complex environmental restoration projects, utilizing state-of-the-art technology. Many of the GJO missions have been completed in recent years. In 1998, DOE Headquarters directed GJO to reduce its mortgage costs by transferring ownership of the site and to lease space at a reasonable rate for its ongoing work. A local community group and GJO have entered into a sales contract; signing of the Quitclaim Deed is planned for February 16, 2001. Site transfer tasks were organized as a project with a critical-path schedule to track activities and a Site Transition Decision Plan was prepared that included a decision process flow chart, key tasks, and responsibilities. Specifically, GJO identified the end state with affected parties early on, successfully dealt with site contamination issues, and negotiated a lease-back arrangement, resulting in an estimated savings of more than 60 percent of facility maintenance costs annually. Lessons learned regarding these transition activities could be beneficial to many other sites.

  17. EV Everywhere Grand Challenge Blueprint | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere Grand Challenge Blueprint EV Everywhere Grand Challenge Blueprint Recognizing that vehicle electrification is an essential part of our countrys "all-of-the above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to enable plug-in electric vehicles (PEVs) that are as affordable and convenient for the American family as gasoline-powered vehicles by 2022. This "Blueprint" provides an outline

  18. SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Grand Challenge Workshop -Imaging Subsurface.pdf More Documents & Publications AGU SubTER Town Hall Presentation 2015 SubTER Fact Sheet SubTER Presentation at Town Hall - ...

  19. City of Grand Rapids- Green Power Purchasing Policy

    Broader source: Energy.gov [DOE]

    In 2005, the City of Grand Rapids established a goal of purchasing 20% of its municipal power demand from renewable energy by 2008. In November 2007, the city signed a three-year agreement with a...

  20. EV Everywhere Grand Challenge - Battery Status and Cost Reduction...

    Broader source: Energy.gov (indexed) [DOE]

    Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL. 5howellb.pdf (1.24 MB) More Documents & Publications PHEV Battery Cost Assessment ...

  1. EV Everywhere Grand Challenge - Battery Workshop attendees list...

    Broader source: Energy.gov (indexed) [DOE]

    Attendance list for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree OHare, Chicago, IL. companiesinattendanceb.pdf (149.45 KB) More ...

  2. 2014 SunShot Grand Challenge Summit Opening Session Photos |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Anaheim Mayor Tom Tait with SunShot Director Minh Le Credit: SunShot Initiative Date ... SunShot Grand Challenge Summit Opening Session SunShot Director Minh Le Credit: SunShot ...

  3. EV Everywhere Grand Challenge Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3_davis_caci.pdf (591.63 KB) More Documents & Publications EV Everywhere Framing Workshop Report Out & Lessons Learned EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Grand Challenge - Charge to the Breakout Groups

  4. EA-1037: Uranium Lease Management Program, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve the nation's immediately accessible supply of...

  5. Grand Forks County, North Dakota: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Dakota. Its FIPS County Code is 035. It is classified as ASHRAE 169-2006 Climate Zone Number 7 Climate Zone Subtype A. Registered Energy Companies in Grand Forks County, North...

  6. EV Everywhere Grand Challenge Introduction for Electric Drive Workshop

    Broader source: Energy.gov [DOE]

    Presentation given by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, 2012 held at the Doubletree O'Hare, Chicago, IL.

  7. Evaluation of Geothermal Potential of Rio Grande Rift and Basin...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Evaluation of Geothermal Potential of Rio Grande Rift and Basin and Range Province, New Mexico Abstract A...

  8. Arroyo Grande, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    This article is a stub. You can help OpenEI by expanding it. Arroyo Grande is a city in San Luis Obispo County, California. It falls under California's 22nd congressional...

  9. Grand Opening for Project LIBERTY: Nation's First Plant to Use...

    Energy Savers [EERE]

    for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock August 28, 2014 ...

  10. Casa Grande, Arizona: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Casa Grande is a city in Pinal County, Arizona. It falls under Arizona's 1st congressional...

  11. Fernald Preserve Visitors Center Grand Opening and LEED Platinum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certification | Department of Energy Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to

  12. SubTER Grand Challenge Roundtable: Imaging Geophysical and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface The Grand Challenge SubTER Panel (Dr. Marcia McNutt, Chair) DOE Leads: Margaret Coleman, Julio Friedmann, Doug Hollett, and Harriet Kung Introduction The future of the world's energy production and deployment is closely tied to our understanding of the subsurface, as well as our capabilities in subsurface or geologic engineering. Developments over the past ten years, including the growth of natural

  13. EV Everywhere Grand Challenge - Charging Infrastructure Enabling Flexible

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Design | Department of Energy Charging Infrastructure Enabling Flexible EV Design EV Everywhere Grand Challenge - Charging Infrastructure Enabling Flexible EV Design Presentation given at the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA 5_slezak_caci.pdf (2 MB) More Documents & Publications EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Framing

  14. EV Everywhere Grand Challenge - Electric Drive (Power Electronics and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Machines) Workshop | Department of Energy - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop List of companies in attendance at the Electric Drive Workshop held on July 24, 2012 at the Doubletree O'Hare, Chicago, IL companies_in_attendance_ed.pdf (145.65 KB) More Documents & Publications EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV

  15. Montage Builders Northern Forest, Ryerson University Selected as Grand

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Winners of First Student Design Competition for Zero Energy Ready Homes | Department of Energy Montage Builders Northern Forest, Ryerson University Selected as Grand Winners of First Student Design Competition for Zero Energy Ready Homes Montage Builders Northern Forest, Ryerson University Selected as Grand Winners of First Student Design Competition for Zero Energy Ready Homes April 29, 2014 - 2:15pm Addthis To help cut energy waste and improve U.S. energy productivity, the Energy

  16. CD-0, Approve Mission Need

    Broader source: Energy.gov [DOE]

    The Initiation Phase begins with the identification of a mission-related need. A Program Office will identify a credible performance gap between its current capabilities and capacities and those required to achieve the goals articulated in its strategic plan. The Mission Need Statement (MNS) is the translation of this gap into functional requirements that cannot be met through other than material means. It should describe the general parameters of the solution and why it is critical to the overall accomplishment of the Department’s mission, including the benefits to be realized. The mission need is independent of a particular solution, and should not be defined by equipment, facility, technological solution, or physical end-item. This approach allows the Program Office the flexibility to explore a variety of solutions and not limit potential solutions (refer to DOE G 413.3-17). The requirements needed to attain CD-0 are listed below.

  17. EA-1338: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts for the proposed transfer of real and personal property at the U.S. Department of Energy's Grand Junction Office to non-DOE ownership.

  18. Sandia National Laboratories: About Sandia: Mission Areas

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Areas Mission Statements The Laboratory Leadership Team decided on a set of integrated Mission Areas that best reflect Sandia's mission based on three key characteristics: synergy with nuclear weapons capabilities, national security impact, and strategic value needed to ensure Sandia's enduring contribution to the nation. The Mission Areas bring focus to the work we conduct in national security. The middle tier Mission Areas are strongly interdependent with and essential to the nuclear

  19. Hydraulic Institute Mission and Vision:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Institute Mission and Vision: Vision: To be a global authority on pumps and pumping systems. Mission: To be a value-adding resource to member companies and pump users worldwide by: * Developing and delivering comprehensive industry standards. * Expanding knowledge by providing education and tools for the effective application, testing, installation, operation and maintenance of pumps and pumping systems. * Serving as a forum for the exchange of industry information. The Hydraulic Institute is a

  20. Mission and Goals | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission and Goals The mission of the Advanced Photon Source (APS) is to deliver world-class science and technology by operating an outstanding synchrotron radiation research...

  1. ARM-UAV Mission Gateway System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM-UAV Mission Gateway System S. T. Moore and S. Bottone Mission Research Corporation Santa Barbara, California Introduction The Atmospheric Radiation Measurement-unmanned ...

  2. Connecting Sustainability to the Agency's Mission | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connecting Sustainability to the Agency's Mission Fact sheet describes a case study on the U.S. Fish and Wildlife Service (FWS) Energy Management Program's mission to increase ...

  3. PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy -1 and EA-33-A Rio Grande Electric Cooperative Inc PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc Rescission of Presidential Permit and Electricity Export Authorization for Rio Grande Electric Cooperative to Export electricity to Mexico. PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc (52.93 KB) More Documents & Publications EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. PP-53 Rio Grande Electric Cooperative, Inc. PP-33 Rio Grande Electric Cooperative

  4. Environmental Audit of the Grand Junction Projects Office

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  5. "The Voyager Mission to the Outer Planets and Interstellar Space", Dr. Alan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C. Cummings, California Institute of Technology | Princeton Plasma Physics Lab October 17, 2012, 4:15pm Colloquia MBG Auditorium "The Voyager Mission to the Outer Planets and Interstellar Space", Dr. Alan C. Cummings, California Institute of Technology Presentation: Office presentation icon WC17OCT2012_ACCummings.ppt Thirty-five years after their launches in 1977, the twin Voyager spacecraft have completed the Grand Tour of the outer planets and are now exploring the outer regions

  6. Grand Traverse Band of Ottawa and Chippewa Indians- 2005 Project

    Broader source: Energy.gov [DOE]

    The Grand Traverse Band of Ottawa and Chippewa Indians (GTB) will conduct a feasibility study to determine the cost effectiveness and other economic, environmental, cultural, and social benefits of maximizing the diversity of energy sources used at GTB facilities. This includes an assessment of energy conservation measures as well as renewable energy sources such as wind, solar, and biomass.

  7. SunShot Grand Challenge Summit and Peer Review 2014

    Broader source: Energy.gov [DOE]

    The 2014 SunShot Grand Challenge Summit and Peer Review brought together more than 800 members of the solar community to review the progress made toward the SunShot goal and discuss the challenges ahead to make solar energy more affordable and widespread across America. Download the Summit conference presentations here.

  8. EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. Order authorizing Rio Grande Electric Cooperative, Inc to export electric energy to Mexico PDF icon EA-33-A and PP-33-1 ...

  9. Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22...

    Broader source: Energy.gov (indexed) [DOE]

    2014 SunShot Grand Challenge Summit and Peer Review SunShot Grand Challenge Summit Opening Session Energy Department Announces New Prize Challenge to Drive Down Solar Costs

  10. Media Invitation: 2014 SunShot Grand Challenge Summit and Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review April 14, 2014 - 4:27pm Addthis Media ...

  11. Solar Community Comes Out in Full Force for SunShot Grand Challenge...

    Energy Savers [EERE]

    Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit May 22, 2014 - 9:58am Addthis ...

  12. The emerging multi-polar world and China's grand game (Journal...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: The emerging multi-polar world and China's grand game Citation Details In-Document Search Title: The emerging multi-polar world and China's grand game You are ...

  13. Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion ...

  14. Mission

    Broader source: Energy.gov [DOE]

    Through strategic investments in science and technology, the U.S. Department of Energy (DOE) helps power and secure America's future. DOE's capabilities, and the innovations it supports,...

  15. Grand Traverse Band Renewable Energy Feasibility Study in Wind, Biomass and Solar

    SciTech Connect (OSTI)

    Suzanne McSawby, Project Director Steve Smiley, Principle Investigator Grand Traverse Resort, Cost Sharing Partner

    2008-12-31

    Renewable Energy Feasibility Study for wind, biomass, solar on the Grand Traverse Band tribal lands from 2005 - 2008

  16. SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spectrum | Department of Energy Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum June 13, 2012 - 5:30pm Addthis Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by Dennis Schroeder/NREL. Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by

  17. SunShot Grand Challenge: Summit and Technology Forum | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grand Challenge: Summit and Technology Forum SunShot Grand Challenge: Summit and Technology Forum The SunShot Grand Challenge: Summit and Technology Forum was the first event in a series of Department of Energy Grand Challenges. This event focused on SunShot Initiative goals of achieving grid-parity solar energy within the decade. The SunShot Summit and Technology Forum included: Plenary sessions featuring Energy Secretary Steven Chu and other industry leaders Group discussions focusing on the

  18. Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Grand Ronde Solar Projects Reduce Pollution, Cut Costs Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs October 20, 2014 - 5:00pm Addthis PV panels installed on Grand Ronde Tribal Housing Authority carport. Photo from GRTHA, NREL 31797 PV panels installed on Grand Ronde Tribal Housing Authority carport. Photo from GRTHA, NREL 31797 Challenge: Situated on nearly 12,000 acres in the heart of Western Oregon's scenic coastal range, the

  19. Our Mission | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Creating Materials and Energy Solutions Ames Laboratory creates materials, inspires minds to solve problems, and addresses global challenges. Our Core Values EXCELLENCE: We are recognized for world-class research, nurturing excellence in science, education and people. PEOPLE: Our people are the core of our success. SAFETY: We demonstrate that safety and world-class research go hand in hand. INSPIRATION: We inspire future generations by exciting them about science. AGILITY: We adapt with

  20. August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site

    Office of Legacy Management (LM)

    Sampling at the Grand Junction, Colorado, Disposal Site October 2015 LMS/GRJ/S00815 This page intentionally left blank U.S. Department of Energy DVP-August 2015, Grand Junction, Colorado October 2015 RIN 15077245 Page i Contents Sampling Event Summary ...............................................................................................................1 Grand Junction, Colorado, Disposal Site, Sample Location Map ...................................................3 Data Assessment

  1. January 2016 Groundwater and Surface Water Sampling at the Grand Junction, Colorado, Processing Site

    Office of Legacy Management (LM)

    6 Groundwater and Surface Water Sampling at the Grand Junction, Colorado, Processing Site March 2016 LMS/GJT/S00116 This page intentionally left blank U.S. Department of Energy DVP-January 2016, Grand Junction, Colorado March 2016 RIN 15127576 Page i Contents Sampling Event Summary ...............................................................................................................1 Grand Junction, Colorado, Processing Site, Sample Location Map

  2. EA-178-B Edison Mission Marketing & Trading, Inc | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -B Edison Mission Marketing & Trading, Inc EA-178-B Edison Mission Marketing & Trading, Inc Order authorizing Edison Mission Marketing & Trading, Inc to export electric energy to ...

  3. Petroleum Reserves Vision, Mission and Goals | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Petroleum Reserves Vision, Mission and Goals Petroleum Reserves Vision, Mission and Goals The mission of the Office of Petroleum Reserves is to protect the United States from...

  4. 2014 SunShot Grand Challenge Summit Opening Session Photos | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Opening Session Photos 2014 SunShot Grand Challenge Summit Opening Session Photos Addthis SunShot Grand Challenge Summit Opening Session 1 of 35 SunShot Grand Challenge Summit Opening Session Anaheim Mayor Tom Tait with SunShot Director Minh Le Credit: SunShot Initiative Date taken: 2014-05-19 16:01 SunShot Grand Challenge Summit Opening Session 2 of 35 SunShot Grand Challenge Summit Opening Session SunShot Director Minh Le Credit: SunShot Initiative Date taken: 2014-05-19 16:06

  5. City of Grand Rapids Building Solar Roof Demonstration

    SciTech Connect (OSTI)

    DeClercq, Mark; Martinez, Imelda

    2012-08-31

    Grand Rapids, Michigan is striving to reduce it environmental footprint. The municipal government organization has established environmental sustainability policies with the goal of securing 100% of its energy from renewable sources by 2020. This report describes the process by which the City of Grand Rapids evaluated, selected and installed solar panels on the Water/Environmental Services Building. The solar panels are the first to be placed on a municipal building. Its new power monitoring system provides output data to assess energy efficiency and utilization. It is expected to generate enough clean solar energy to power 25 percent of the building. The benefit to the public includes the economic savings from reduced operational costs for the building; an improved environmentally sustainable area in which to live and work; and increased knowledge about the use of solar energy. It will serve as a model for future energy saving applications.

  6. SunShot Grand Challenge Summit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Grand Challenge Summit Online registration is now closed Online registration is now closed Limited onsite registration is available. Learn more. Read more Resources for Summit Attendees Resources for Summit Attendees Plan your Summit experience today by accessing event schedules, venue information and more. Read more Exciting Keynotes, Plenary Sessions, Industry Workshops, Technology Forum and Peer Review Exciting Keynotes, Plenary Sessions, Industry Workshops, Technology Forum and Peer

  7. Upper Rio Grande Simulation Model (URGSiM)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upper Rio Grande Simulation Model (URGSiM) - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management

  8. SunShot Grand Challenge Summit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Grand Challenge Summit Online registration is now closed Online registration is now closed Limited onsite registration is available. Learn more. Read more Resources for Summit Attendees Resources for Summit Attendees Plan your Summit experience today by accessing event schedules, venue information and more. Read more Exciting Keynotes, Plenary Sessions, Industry Workshops, Technology Forum and Peer Review Exciting Keynotes, Plenary Sessions, Industry Workshops, Technology Forum and Peer

  9. Climate-Science Computational End Station Development and Grand Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Team | Argonne Leadership Computing Facility Total precipitable water, a measure of how much moisture is in the air from a single moment in time in the global simulation of the atmosphere at a resolution of half a degree of latitude. (Figure provided by Mark Taylor, Sandia National Laboratories.) Figure provided by Mark Taylor, Sandia National Laboratories. Climate-Science Computational End Station Development and Grand Challenge Team PI Name: Warren Washington, Tom Bettge PI Email:

  10. Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.

    SciTech Connect (OSTI)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

  11. Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.

    SciTech Connect (OSTI)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

  12. Comets and the Stardust Mission

    ScienceCinema (OSTI)

    LLNL - University of California Television

    2009-09-01

    The occasional appearance of comets has awed humans throughout history. But how much do we really know about comets? Did a comet kill the dinosaurs? And, what can comets tell us about our own ancient history? With comet dust from NASA's Stardust mission, scientists like Hope Ishii, a Research Scientist at Lawrence Livermore National Laboratory, are beginning to answer these questions. She and high school teacher Tom Shefler look at how comets formed, their role in the Earth's history and the clues about what happened over 4 billion years ago. Series: Science on Saturday [5/2008] [Science] [Show ID: 14492

  13. Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-06-01

    The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

  14. China 2015 Business Development Mission Marketing Flyer | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy China 2015 Business Development Mission Marketing Flyer China 2015 Business Development Mission Marketing Flyer China 2015 Business Development Mission Marketing Flyer China 2015 Business Development Mission Marketing Flyer (131.94 KB) More Documents & Publications DOC-DOE China Mission Announcement Press Release DOC-DOE Joint China Mission Statement Audit of Department of Energy International Charter Flights, IG-0397

  15. DOE Selects Mission Support Alliance, LLC for Mission Support Contract at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its Hanford Site | Department of Energy Mission Support Alliance, LLC for Mission Support Contract at its Hanford Site DOE Selects Mission Support Alliance, LLC for Mission Support Contract at its Hanford Site September 3, 2008 - 3:20pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the Mission Support Alliance, LLC has been selected as the mission support contractor for DOE's Hanford Site in southeastern Washington State. The contract is a cost-plus award-fee

  16. Mission | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Mission Mission Statement "Enhancing and ensuring the future of the Nuclear Security Enterprise through effective nuclear production operations" Mission Execute effective contract management and oversight to safely and securely maintain the nuclear weapon stockpile for the Nuclear Security Enterprise; provide enriched uranium for naval, research, and isotope production reactors, and support nonproliferation activities to reduce the global nuclear threat. Vision Make the world safer by

  17. Microsoft PowerPoint - Mission.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration's mission is to market and reliably deliver Federal hydroelectric power with preference to public bodies and cooperatives. This is accomplished by maximizing the use of Federal assets to repay the Federal investment and participating with other water resource users in an effort to balance diverse interests with power needs within broad parameters set by the U.S. Army Corps of Engineers, and implementing public policy. Mission Statement Mission Statement

  18. Research Mission - MST - UW Plasma Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Mission UW Madison Madison Symmetric Torus Research Mission MST HomeGraduate Student InformationLinksTourControl and Auxiliary SystemsPhysics TopicsDeviceResearch MissionMST People mst logo CPLA Home Directory Publications Links Internal University of Wisconsin Physics Department Research funding includes support from: Department of Energy National Science Foundation Additional Information: Information for Prospective Graduate Students With the MST facility, physicists study hot plasmas

  19. Mission Motors Company | Open Energy Information

    Open Energy Info (EERE)

    Place: San Francisco, California Zip: 94103 Product: San Francisco-based electric Motorcycle manufacturer. References: Mission Motors Company1 This article is a stub. You can...

  20. Space Nuclear MIssion History | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    systems and radioisotope heater units for NASA, Navy, Air Force, DOE. Mission Year ... Earth - Technology Demonstration Nimbus III 1969 NASA Earth - Weather Satelitte Apollo 11 ...

  1. Equal Employment Opportunity: Collaborating for Mission Success

    National Nuclear Security Administration (NNSA)

    ... for employment and contractors with technical advice on all matters Mission 2012 NNSA Office of Civil Rights Accomplishment Report 4 Organizational Chart: FY 2012 2012 NNSA ...

  2. Petroleum Reserves Vision, Mission and Goals

    Broader source: Energy.gov [DOE]

    The mission of the Office of Petroleum Reserves is to protect the United States from severe petroleum supply interruptions through the aquisition, storage, distribution, and management of emergency...

  3. Small Business Support of DOE Mission

    Broader source: Energy.gov [DOE]

    Our Program Offices, National Laboratories, Power Marketing Administration, and Operations Offices have unique roles in meeting the Energy Department's critical mission.

  4. [The mission of Princeton Plasma Physics Laboratory

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This report discusses the following about Princeton Plasma Physics Laboratory: its mission; requirements and guidance documents for the QA program; architecture; assessment organization; and specific management issues.

  5. [The mission of Princeton Plasma Physics Laboratory

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    This report discusses the following about Princeton Plasma Physics Laboratory: its mission; requirements and guidance documents for the QA program; architecture; assessment organization; and specific management issues.

  6. Reviewing the success of intentional flooding of the Grand Canyon

    SciTech Connect (OSTI)

    Wirth, B.D.

    1997-04-01

    A description and evaluation of the results of an intentional flooding experiment at the Grand Canyon are described. The purpose of the 7-day release of flood waters from the Glen Canyon Dam was to determine if managed floods have the ability to predictably restore the riverine environment. A summary of environmental conditions leading to the experiment is provided and flood results are listed. Initial results showed significant improvement in the size and number of the river`s beaches, creation of backwater habitat for endangered species, and no adverse impact to the trout fishery, Indian cultural sites, and other resources.

  7. Statement by Energy Secretary Steven Chu on Today's Grand Opening of the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nordex Manufacturing Facility in Jonesboro, Arkansas | Department of Energy Today's Grand Opening of the Nordex Manufacturing Facility in Jonesboro, Arkansas Statement by Energy Secretary Steven Chu on Today's Grand Opening of the Nordex Manufacturing Facility in Jonesboro, Arkansas October 29, 2010 - 12:00am Addthis WASHINGTON, D.C. - U.S. Energy Secretary Steven Chu issued the following statement on today's grand opening of the Nordex wind turbine manufacturing facility in Jonesboro. The

  8. Grand Junction, Colorado, Disposal Site Long-Term Surveillance and Maintenance Program Fact Sheet, July 2001

    Office of Legacy Management (LM)

    Grand Junction Disposal Site Uranium ore was processed at the Climax millsite at Grand Junction, Colorado, between 1951 and 1970. The milling operations created process-related waste and tailings, a sandlike material containing radioactive materials and other contaminants. The tailings were an ideal and inexpensive construction material suitable for concrete, mortar, and fill. Accordingly, the tailings were widely used in the Grand Junction area for these purposes. The U.S. Department of Energy

  9. Grand Challenges for Biological and Environmental Research: A Long-Term Vision

    SciTech Connect (OSTI)

    Arkin, A.; Baliga, N.; Braam, J.; Church, G.; Collins, J; Cottingham, R.; Ecker, J.; Gerstein, M.; Gilna, P.; Greenberg, J.; Handelsman, J.; Hubbard, S.; Joachimiak, A.; Liao, J.; Looger, L.; Meyerowitz, E.; Mjolness, E.; Petsko, G.; Sayler, G.; Simpson, M.; Stacey, G.; Sussman, M.; Tiedje, J.; Bader, D.; Cessi, P.; Collins, W.; Denning, S.; Dickinson, R.; Easterling, D.; Edmonds, J.; Feddema, J.; Field, C.; Fridlind, A.; Fung, I.; Held, I.; Jackson, R.; Janetos, A.; Large, W.; Leinen, M.; Leung, R.; Long, S.; Mace, G.; Masiello, C.; Meehl, G.; Ort, D.; Otto-Bliesner, B.; Penner, J.; Prather, M.; Randall, D.; Rasch, P.; Schneider, E.; Shugart, H.; Thornton, P.; Washington, W.; Wildung, R.; Wiscombe, W.; Zak, D.; Zhang, M.; Bielicki, J.; Buford, M.; Cleland, E.; Dale, V.; Duke, C.; Ehleringer, J.; Hecht, A.; Kammen, D.; Marland, G.; Pataki, D.; Riley, M. Robertson, P.; Hubbard, S.

    2010-12-01

    behaviors of complex biological and environmental systems, leading to robust solutions for DOE missions and strategic goals. In March 2010, the Biological and Environmental Research Advisory Committee held the Grand Challenges for Biological and Environmental Research: A Long-Term Vision workshop to identify scientific opportunities and grand challenges for BER science in the coming decades and to develop an overall strategy for drafting a long-term vision for BER. Key workshop goals included: (1) Identifying the greatest scientific challenges in biology, climate, and the environment that DOE will face over a 20-year time horizon. (2) Describing how BER should be positioned to address those challenges. (3) Determining the new and innovative tools needed to advance BER science. (4) Suggesting how the workforce of the future should be trained in integrative system science. This report lays out grand research challenges for BER - in biological systems, climate, energy sustainability, computing, and education and workforce training - that can put society on a path to achieve the scientific evidence and predictive understanding needed to inform decision making and planning to address future energy needs, climate change, water availability, and land use.

  10. Tank waste remediation system mission analysis

    SciTech Connect (OSTI)

    Baynes, P.A.; Woods, J.W.; Collings, J.L.

    1993-03-01

    Mission analysis is an iterative process that expands the mission statement, identifies needed information, and provides sufficient insight to proceed with the necessary, subsequent analyses. The Tank Waste Remediation System (TWRS) mission analysis expands the TWRS Program problem statement: ``remediate tank waste.`` It also and the mission statement: ``store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost effective manner.`` The mission analysis expands the problem and mission statements to accomplish four primary tasks. First, it defines the mission in enough detail to provide any follow-on work with a consistent foundation. Second, it defines the TWRS boundaries. Third, it identifies the following for TWRS: (1) current conditions, (2) acceptable final conditions, (3) requirement sources for the final product and the necessary systems, (4) organizations authorized to issue requirements, and (5) the criteria to determine when the problem is solved. Finally, it documents the goals to be achieved.This document concludes that tank safety issues should be resolved quickly and tank waste should be treated and immobilized quickly because of the hazardous nature of the tank waste and the age and condition of the existing tanks. In addition, more information is needed (e.g., waste acceptance criteria, condition of existing waste) to complete the TWRS mission analysis.

  11. Tank waste remediation system mission analysis

    SciTech Connect (OSTI)

    Baynes, P.A.; Woods, J.W. ); Collings, J.L. )

    1993-03-01

    Mission analysis is an iterative process that expands the mission statement, identifies needed information, and provides sufficient insight to proceed with the necessary, subsequent analyses. The Tank Waste Remediation System (TWRS) mission analysis expands the TWRS Program problem statement: remediate tank waste.'' It also and the mission statement: store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost effective manner.'' The mission analysis expands the problem and mission statements to accomplish four primary tasks. First, it defines the mission in enough detail to provide any follow-on work with a consistent foundation. Second, it defines the TWRS boundaries. Third, it identifies the following for TWRS: (1) current conditions, (2) acceptable final conditions, (3) requirement sources for the final product and the necessary systems, (4) organizations authorized to issue requirements, and (5) the criteria to determine when the problem is solved. Finally, it documents the goals to be achieved.This document concludes that tank safety issues should be resolved quickly and tank waste should be treated and immobilized quickly because of the hazardous nature of the tank waste and the age and condition of the existing tanks. In addition, more information is needed (e.g., waste acceptance criteria, condition of existing waste) to complete the TWRS mission analysis.

  12. Tank waste remediation system mission analysis report

    SciTech Connect (OSTI)

    Acree, C.D.

    1998-01-06

    The Tank Waste Remediation System Mission Analysis Report identifies the initial states of the system and the desired final states of the system. The Mission Analysis Report identifies target measures of success appropriate to program-level accomplishments. It also identifies program-level requirements and major system boundaries and interfaces.

  13. 2011 Annual Planning Summary for Office of Legacy Management (LM), Grand Junction (See LM APS)

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Legacy Management (LM), Grand Junction (See LM APS).

  14. Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review April 14, 2014 - 4:27pm Addthis Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review You're Invited: 2014 SunShot Grand Challenge Summit and Peer Review Hear from solar's brightest visionaries about what's on the horizon for the U.S. solar energy industry WASHINGTON, D.C. -- Members of the media are invited to attend

  15. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  16. Feasibility for Reintroducing Sockeye and Coho Salmon in the Grande Ronde Basin, 1998 Final Report.

    SciTech Connect (OSTI)

    Cramer, Steven P.; Witty, Kenneth L.

    1998-07-01

    A report concerning the feasibility of reintroducing Sockeye Salmon into Wallowa Lake and Coho Salmon into the Grande Ronde River Basin.

  17. EV Everywhere EV Everywhere Grand Challenge- Electric Drive (Power Electronics and Electric Machines) Workshop Agenda

    Broader source: Energy.gov [DOE]

    Agenda for the EV Everywhere Grand Challenge - Electric Drive Workshop on July 24, 2012 at the Doubletree O'Hare, Chicago, IL

  18. EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Attendence List

    Broader source: Energy.gov [DOE]

    Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

  19. Geomorphology of plutonium in the Northern Rio Grande

    SciTech Connect (OSTI)

    Graf, W.L.

    1993-03-01

    Nearly all of the plutonium in the natural environment of the Northern Rio Grande is associated with soils and sediment, and river processes account for most of the mobility of these materials. A composite regional budget for plutonium based on multi-decadal averages for sediment and plutonium movement shows that 90 percent of the plutonium moving into the system is from atmospheric fallout. The remaining 10 percent is from releases at Los Alamos. Annual variation in plutonium flux and storage exceeds 100 percent. The contribution to the plutonium budget from Los Alamos is associated with relatively coarse sediment which often behaves as bedload in the Rio Grande. Infusion of these materials into the main stream were largest in 1951, 1952, 1957, and 1968. Because of the schedule of delivery of plutonium to Los Alamos for experimentation and weapons manufacturing, the latter two years are probably the most important. Although the Los Alamos contribution to the entire plutonium budget was relatively small, in these four critical years it constituted 71--86 percent of the plutonium in bedload immediately downstream from Otowi.

  20. Binary Solid Propellants for Constant Momentum Missions

    SciTech Connect (OSTI)

    Pakhomov, Andrew V.; Mahaffy, Kevin E.

    2008-04-28

    A constant momentum mission is achieved when the speed of the vehicle in the inertial frame of reference is equal to the speed of exhaust relative to the vehicle. Due to 100% propulsive efficiency such missions are superior to traditional constant specific impulse missions. A new class of solid binary propellants for constant momentum missions is under development. A typical propellant column is prepared as a solid solution of two components, with composition gradually changing from 100% of a propellant of high coupling coefficient (C{sub m}) to one which has high specific impulse (I{sub sp}). The high coupling component is ablated first, gradually giving way to the high I{sub sp} component, as the vehicle accelerates. This study opens new opportunities for further design of complex propellants for laser propulsion, providing variable C{sub m} and I{sub sp} during missions.

  1. DOC-DOE Joint China Mission Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Joint China Mission Statement DOC-DOE Joint China Mission Statement DOC-DOE Joint China Mission Statement DOC-DOE Joint China Mission Statement (109.75 KB) More Documents & Publications DOC-DOE China Mission Announcement Press Release FACT SHEET: U.S.-China Clean Energy Cooperation Announcements US-China Clean Energy Cooperation

  2. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    SciTech Connect (OSTI)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP) that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological

  3. Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

    SciTech Connect (OSTI)

    McGowan, Vance R.; Morton, Winston H.

    2008-12-30

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by

  4. Salto Grande. [1890-MW project on Vruguay River

    SciTech Connect (OSTI)

    de Hoyos, R.J.

    1980-09-01

    A joint hydroelectric project, the Salto Grande Dam on the Uruguay River, serves six million people in Argentina and Uruguay. The construction day was continuous from April 1974 until the first turbine began on schedule in July 1979. Although planning began in 1890 by individual visionaries who saw the river's potential, serious efforts did not get underway for another 50 years. The project became a technical training school and has built up a recognized management team in the process. Financing became available only after the 1973 oil embargo. The benefits of regional cooperation to develop a common resource enables the two countries to provide water resources, electric power, navigable streams for commerce and recreation, a common highway, and an interconnecting railroad. The cooperative infrastructure established to meet the needs of project personnel has improved living conditions for the area. (DCK)

  5. A Leptophobic Z' And Dark Matter From Grand Unification

    SciTech Connect (OSTI)

    Buckley, Matthew R.; Hooper, Dan; Rosner, Jonathan L.

    2011-09-01

    We explore the phenomenology of Grand Unified Models based on the E_6 group, focusing on the Z' with suppressed couplings to leptons that can appear in such models. We find that this Z' can accommodate the W+dijets anomaly reported by the CDF collaboration. Furthermore, a viable dark matter candidate in the form of a right-handed sneutrino is also present within the fundamental 27-dimensional representation of E_6. Through its sizable couplings to the Z', the dark matter is predicted to possess an elastic scattering cross section with neutrons which can generate the signals reported by the CoGeNT and DAMA/LIBRA collaborations. To avoid being overproduced in the early universe, the dark matter must annihilate to leptons through the exchange of charged or neutral fermions which appear in the 27 of E_6, providing an excellent fit to the gamma ray spectrum observed from the Galactic Center by the Fermi Gamma Ray Space Telescope.

  6. Precision welding cuts downtime at Grand Coulee Dam

    SciTech Connect (OSTI)

    Light, S.; White, E.

    1997-03-01

    The three large 700-MW generators at Grand Coulee Dam--originally built and installed by Canadian General Electric in the late 1970s--are being upgraded using precision welding techniques and leading edge installation technology. These generators suffered from numerous water leaks at and around the bar water connections, resulting in a significant number of forced repair outages that were increasing in frequency. The US Bureau of Reclamation, in conjunction with the Bonneville Power Administration, decided to overhaul these machines. The design from Siemens Power Corp. provided state-of-the-art materials and included a rating increase from 700 to 805 MW, which would make these three machines the highest output single-unit hydrogenerators in the world. The upgrade was to be accomplished with only the replacement of the stator components; there would be no changes to the rotating element. The cost for all three machines is approximately $27.5 million. This project is described in this paper.

  7. Scientific Grand Challenges Workshop Series | U.S. DOE Office of Science

    Office of Science (SC) Website

    (SC) Scientific Grand Challenges Workshop Series Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) Community Resources Featured Content ASCR Discovery ASCR Program Documents ASCR Workshops and Conferences Workshops & Conferences Archive DOE Simulations Summit Scientific Grand Challenges Workshop Series SciDAC Conferences HPC Operations Review

  8. December 2015 Groundwater and Surface Waater Sampling at the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    and Surface Water Sampling at the Grand Junction, Colorado, Site March 2016 LMS/GJO/S01215 This page intentionally left blank U.S. Department of Energy DVP-December 2015, Grand Junction, Colorado March 2016 RIN 15117528 Page i Contents Sampling Event Summary ...............................................................................................................1 Data Assessment Summary

  9. DOE Exercises Option for Mission Support Contract

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC – The Department of Energy (DOE) is extending Mission Support Alliance’s (MSA) contract for infrastructure and site services at the Hanford Site in southeastern Washington state by three years.

  10. Mission, Kansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Mission is a city in Johnson County, Kansas. It falls under Kansas's 3rd congressional district.12 Registered...

  11. The Mission of the Mars Exploration Rovers

    ScienceCinema (OSTI)

    Grant, John [Smithsonian Institution, Washington, D.C., United States

    2010-01-08

    The Mars Exploration Rover mission was expected to last 3 months, but has continued for more than 4 years. The major science results from both rovers will be summarized.

  12. Enforcement Letter, Mission Support Alliance, LLC | Department...

    Broader source: Energy.gov (indexed) [DOE]

    an Enforcement Letter (WEL-2015-07) to Mission Support Alliance, LLC, relating to a worker hand injury that occurred during a crane re-spooling operation at DOE's Hanford site. ...

  13. Record of Decision for Mars 2020 Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Record of Decision for Mars 2020 Mission Mars 2020 Rover instrument selection. Mars 2020 Rover instrument selection. NASA issued a record of decision (ROD) to use a nuclear battery ...

  14. Campo Band of Mission Indians- 2010 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Campo Band of Mission Indians ("Band") goal is to develop a 300 MW wind energy project ("Kumeyaay Wind II") in two phases over the next two to five years.

  15. STARS MDT-II targets mission

    SciTech Connect (OSTI)

    Sims, B.A.; White, J.E.

    1997-08-01

    The Strategic Target System (STARS) was launched successfully on August 31, 1996 from the Kauai Test Facility (KTF) at the Pacific Missile Range Facility (PMRF). The STARS II booster delivered a payload complement of 26 vehicles atop a post boost vehicle. These targets were designed and the mission planning was achieved to provide for a dedicated mission for view by the Midcourse Space Experiment (MSX) Satellite Sensor Suite. Along with the MSX Satellite, other corollary sensors were involved. Included in these were the Airborne Surveillance Test Bed (AST) aircraft, the Cobra Judy sea based radar platform, Kwajalein Missile Range (KMR), and the Kiernan Reentry Measurements Site (KREMS). The launch was a huge success from all aspects. The STARS Booster flew a perfect mission from hardware, software and mission planning respects. The payload complement achieved its desired goals. All sensors (space, air, ship, and ground) attained excellent coverage and data recording.

  16. Voluntary Protection Program Onsite Review, Mission Support Alliance, Llc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Mission Support Contract - September 2014 | Department of Energy Mission Support Alliance, Llc Hanford Mission Support Contract - September 2014 Voluntary Protection Program Onsite Review, Mission Support Alliance, Llc Hanford Mission Support Contract - September 2014 September 2014 Recertification of MSA/MSC as a "Conditional" Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the DOE-VPP evaluation of Mission Support

  17. NERSC8_Mission_Need_Final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Need Statement NERSC-8 Page 1 Mission Need Statement for the Next Generation High Performance Production Computing System Project (NERSC-8) (Non-major acquisition project) Office of Advanced Scientific Computing Research Office of Science U.S. Department of Energy Date Approved: Month / Year Mission Need Statement NERSC-8 Page 2 Submitted by: David Goodwin, Program Manager Date Advanced Scientific Computing Research, Office of Science, DOE Concurrence: Daniel Lehman, Director, Date Office of

  18. Energy Saver Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About Us » Energy Saver Mission Energy Saver Mission Energy Saver provides energy efficiency and renewable energy information to consumers in the United States, including families, homeowners, renters, and drivers. Explore the following information and resources from Energy Saver: Heating and Cooling Photo of a thermostat phone app being held in front of a wall-mounted thermostat. Energy Saver offers information on your options for home heating and cooling and water heating, as well as tips for

  19. Pump Systems Matter Mission and Vision:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pump Systems Matter Mission and Vision: Pump Systems Matter(tm) (PSM) places a primary focus on pump systems education and outreach and addresses energy savings and total cost of pump ownership. Vision: Pump Systems Matter initiative assists North American pump users gain a more competitive business advantage through strategic, broad-based energy management and pump system performance optimization. Mission: To provide the marketplace with tools and collaborative opportunities to integrate pump

  20. Los Alamos imager aboard IBEX space mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Imager aboard IBEX space mission Los Alamos imager aboard IBEX space mission This is the first in a new series of talks that will focus on the emerging scientific field of quantitative biology. October 17, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National

  1. Tank waste remediation system mission analysis report

    SciTech Connect (OSTI)

    Acree, C.D.

    1998-01-09

    This document describes and analyzes the technical requirements that the Tank Waste Remediation System (TWRS) must satisfy for the mission. This document further defines the technical requirements that TWRS must satisfy to supply feed to the private contractors` facilities and to store or dispose the immobilized waste following processing in these facilities. This document uses a two phased approach to the analysis to reflect the two-phased nature of the mission.

  2. Mission Plan for the Civilian Radioactive Waste Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    this Mission Plan for the Civilian Radioactive Waste Management Program. The Mission Plan is divided into two parts. Part I describes the overall goals, objectives, and...

  3. The Nuclear Spectroscopic Telescope Array (NuSTAR) Mission (Journal...

    Office of Scientific and Technical Information (OSTI)

    The Nuclear Spectroscopic Telescope Array (NuSTAR) Mission Citation Details In-Document Search Title: The Nuclear Spectroscopic Telescope Array (NuSTAR) Mission You are...

  4. The Nuclear Spectroscopic Telescope Array (NuSTAR) Mission (Journal...

    Office of Scientific and Technical Information (OSTI)

    The Nuclear Spectroscopic Telescope Array (NuSTAR) Mission Citation Details In-Document Search Title: The Nuclear Spectroscopic Telescope Array (NuSTAR) Mission Authors: Harrison,...

  5. The Nuclear Spectroscopic Telescope Array (NuSTAR) Mission (Journal...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Spectroscopic Telescope Array (NuSTAR) Mission Citation Details In-Document Search Title: The Nuclear Spectroscopic Telescope Array (NuSTAR) Mission Authors: Harrison,...

  6. MissionPoint Capital Partners | Open Energy Information

    Open Energy Info (EERE)

    MissionPoint Capital Partners Jump to: navigation, search Name: MissionPoint Capital Partners Place: Norwalk, Connecticut Zip: CT 06854 Product: Private Investment company...

  7. OSTI Mission | OSTI, US Dept of Energy, Office of Scientific...

    Office of Scientific and Technical Information (OSTI)

    OSTI Mission OSTI Mission: To advance science and sustain technological creativity by making R&D findings available and useful to Department of Energy (DOE) researchers and the ...

  8. Los Alamos laser selected for 2020 Mars mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos laser selected for 2020 Mars mission Los Alamos laser selected for 2020 Mars mission SuperCam builds upon the successful capabilities demonstrated aboard the Curiosity ...

  9. Voluntary Protection Program Onsite Review, Hanford Mission Support...

    Office of Environmental Management (EM)

    Hanford Mission Support Contract - October 2011 Voluntary Protection Program Onsite Review, Hanford Mission Support Contract - October 2011 October 2011 Evaluation to determine ...

  10. Mission: Space Plutonium-238 Heat Sources for NASA (Technical...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Mission: Space Plutonium-238 Heat Sources for NASA Citation Details In-Document Search Title: Mission: Space Plutonium-238 Heat Sources for NASA This document ...

  11. Unimpossible Missions: The University Edition | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Impact > Can you do the impossible? Enter our Unimpossible Missions: The University ... Can you do the impossible? Enter our Unimpossible Missions: The University Edition ...

  12. GRC Dream Team Tackles Unimpossible Missions | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The results of their Unimpossible Missions will be released on Thursday. Meet the Dream Team that tackled these Unimpossible Missions: http:www.geglobalresearch.commedia...

  13. A brief history of Sandia's National security missions.

    SciTech Connect (OSTI)

    Drewien, Celeste A.; O'Canna, Myra Lynn; Stikar, John Anthony.

    2014-09-01

    To help members of the workforce understand what factors contribute to Sandia National Laboratories national security mission, the authors describe the evolution of Sandias core mission and its other mission components. The mission of Sandia first as a division of Los Alamos and later as Sandia Corporation underlies our core nuclear weapon mission of today. Sandias mission changed in 1963 and twice more in the 1970s. This report should help staff and management appreciate the need for mission evolution. A clear definition and communication of a consistent corporate mission statement is still needed.

  14. Unimpossible Missions: Making a wall listen | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    This post is a behind-the-scenes look at one of the Unimpossible Missions experiments that ... Enter our Unimpossible Missions: The University Edition challenge lightning bolt We ...

  15. GE Researchers Tackle Three Unimpossible Missions | GE Global...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Impact > Unimpossible Missions: GE researchers prove nothing is impossible Click to ... Unimpossible Missions: GE researchers prove nothing is impossible A team of GE researchers ...

  16. Edison Mission Marktg & Trdg Inc | Open Energy Information

    Open Energy Info (EERE)

    Edison Mission Marktg & Trdg Inc Jump to: navigation, search Name: Edison Mission Marktg & Trdg Inc Place: Massachusetts References: EIA Form EIA-861 Final Data File for 2010 -...

  17. Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Community Comes Out in Full Force for SunShot Grand Challenge Summit Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit May 22, 2014 - 10:13am Addthis Packed House 1 of 12 Packed House An energetic crowd of hundreds of leaders throughout the solar community gathered for the 2014 SunShot Grand Challenge Summit to work together to reduce the costs of solar energy technologies. Image: SunShot Initiative, Energy Department. Solar Tech Forum 2 of 12

  18. Grand challenge problems in environmental modeling and remediation: Groundwater contaminant transport. Final project report 1998

    SciTech Connect (OSTI)

    1998-04-01

    The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997.

  19. Highlights from the 2014 SunShot Grand Challenge Summit | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Highlights from the 2014 SunShot Grand Challenge Summit Highlights from the 2014 SunShot Grand Challenge Summit Addthis Packed House 1 of 12 Packed House An energetic crowd of hundreds of leaders throughout the solar community gathered for the 2014 SunShot Grand Challenge Summit to work together to reduce the costs of solar energy technologies. Image: SunShot Initiative, Energy Department. Solar Tech Forum 2 of 12 Solar Tech Forum Attendees enter the SunShot Summit Technology forum --

  20. Trane- Advancing Today’s Federal Government Mission

    Broader source: Energy.gov [DOE]

    Document describes the qualification sheet for Trane - Advancing Today's Federal Government Mission.

  1. Mars mission laser tool heads to JPL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mars mission laser tool Mars mission laser tool heads to JPL Curiosity will carry the newly delivered laser instrument to reveal which elements are present in Mars' rocks and soils. September 21, 2010 A bright ball of plasma is produced by ChemCam's invisible laser beam striking a rock within the Mars sample chamber. A bright ball of plasma is produced by ChemCam's invisible laser beam striking a rock within the Mars sample chamber. Contact Nancy Ambrosiano Communications Office (505) 667-0471

  2. Los Alamos laser selected for 2020 Mars mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos laser selected for 2020 Mars mission Los Alamos laser selected for 2020 Mars mission SuperCam builds upon the successful capabilities demonstrated aboard the Curiosity Rover during NASA's current Mars Mission. December 22, 2014 SuperCam builds upon the successful capabilities demonstrated aboard the Curiosity Rover during NASA's current Mars Mission. SuperCam builds upon the successful capabilities demonstrated aboard the Curiosity Rover during NASA's current Mars Mission Contact

  3. Updated Radiation Exhibit Unveiled at Math and Science Center in Grand Junction, Colorado

    Broader source: Energy.gov [DOE]

    A newly updated radiation exhibit, created by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) office in Grand Junction, Colorado, was recently unveiled at the John McConnell...

  4. Top 5 Reasons to Attend the SunShot Grand Challenge Solar Summit

    Broader source: Energy.gov [DOE]

    Anticipation for the SunShot Grand Challenge Summit is heating up. Register now for the event, which is taking place May 19 to May 22 in Anaheim, California.

  5. Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    A working committee of local historic preservation specialists held their monthly meeting at the U.S. Department of Energy Office of Legacy Management (LM) Grand Junction, Colorado, Office on...

  6. Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park Dedication and Open House

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) held an open house and park dedication at the Grand Junction, Colorado, Office to commemorate its place in the Manhattan Project...

  7. Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit

    Broader source: Energy.gov [DOE]

    This week in sunny Anaheim, California, more than 800 solar industry leaders gathered for the 2014 SunShot Grand Challenge Summit. The Summit, launched by the Energy Department’s SunShot Initiative...

  8. EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration prepared an EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near O’Neill, Nebraska, to Western’s power transmission system.

  9. Monitoring Fine Sediment; Grande Ronde and John Day Rivers, 1999 Annual Report.

    SciTech Connect (OSTI)

    Rhodes, Jonathan J.; Greene, M. Jonas; Purser, Michael D.

    2000-01-01

    This project was initiated to monitor surface fine sediment levels and overwinter intrusion of fine sediment in spring chinook salmon spawning habitat in the North Folk John Day and Grande Ronde Rivers, for five years.

  10. EV Everywhere Grand Challenge Kick-off Parameters and Analysis | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy off Parameters and Analysis EV Everywhere Grand Challenge Kick-off Parameters and Analysis Presentation at the EV Everywhere Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI. 4-jake.pdf (464.38 KB) More Documents & Publications EV Everywhere Electric Drive Workshop: Preliminary Target-Setting Framework EV Everywhere Battery Workshop: Preliminary Target-Setting Framework EV Everywhere Consumer/Charging Workshop: Target-Setting Framework

  11. A GRAND DESIGN FOR GALAXY CLUSTERS: CONNECTIONS AND PREDICTIONS

    SciTech Connect (OSTI)

    Cavaliere, A.; Lapi, A.; Fusco-Femiano, R.

    2011-11-20

    We analyze with our entropy-based Supermodel a library of 12 galaxy clusters featuring extended X-ray observations of their intracluster plasma (ICP). The few intrinsic parameters of the model-basically, the central level and the outer slope of the entropy profile-enable us to uniformly derive not only robust snapshots of the ICP thermal state, but also the 'concentration' parameter marking the age of the host dark matter (DM) halo. We test these profiles for consistency with numerical simulations and observations. We find the central and the outer entropy correlate, so that these clusters split into two main classes defined on the basis of low (LE) or high entropy (HE) conditions prevailing throughout the ICP. We also find inverse correlations between the central/outer entropy and the halo concentration. We interpret these in terms of mapping the ICP progress on timescales around 5 Gyr toward higher concentrations, under the drive of the DM halo development. The progress proceeds from HE clusters to LE clusters, toward states of deeper entropy erosion by radiative cooling in the inner regions and of decreasing outer entropy production as the accretion peters out. We propose these radial and time features constitute a cluster Grand Design that we use here to derive a number of predictions. For HE clusters we predict sustained outer temperature profiles. For LEs we expect the outer entropy ramp to bend over; hence the temperature declines before steepening at low z; this feature goes together with an increasing turbulent support, a condition that can be directly probed with the Sunyaev-Zel'dovich effect. We finally discuss the looming out of two intermediate subsets: a wiggled HE-tilde at low z that features central temperature profiles retaining imprints of entropy discharged by active galactic nuclei or deep mergers and high-z LEs where the cosmogony/cosmology had little time to enforce a sharp outer entropy bending.

  12. High performance computing and communications grand challenges program

    SciTech Connect (OSTI)

    Solomon, J.E.; Barr, A.; Chandy, K.M.; Goddard, W.A., III; Kesselman, C.

    1994-10-01

    The so-called protein folding problem has numerous aspects, however it is principally concerned with the {ital de novo} prediction of three-dimensional (3D) structure from the protein primary amino acid sequence, and with the kinetics of the protein folding process. Our current project focuses on the 3D structure prediction problem which has proved to be an elusive goal of molecular biology and biochemistry. The number of local energy minima is exponential in the number of amino acids in the protein. All current methods of 3D structure prediction attempt to alleviate this problem by imposing various constraints that effectively limit the volume of conformational space which must be searched. Our Grand Challenge project consists of two elements: (1) a hierarchical methodology for 3D protein structure prediction; and (2) development of a parallel computing environment, the Protein Folding Workbench, for carrying out a variety of protein structure prediction/modeling computations. During the first three years of this project, we are focusing on the use of two proteins selected from the Brookhaven Protein Data Base (PDB) of known structure to provide validation of our prediction algorithms and their software implementation, both serial and parallel. Both proteins, protein L from {ital peptostreptococcus magnus}, and {ital streptococcal} protein G, are known to bind to IgG, and both have an {alpha} {plus} {beta} sandwich conformation. Although both proteins bind to IgG, they do so at different sites on the immunoglobin and it is of considerable biological interest to understand structurally why this is so. 12 refs., 1 fig.

  13. Building Technologies Program Vision, Mission, and Goals

    SciTech Connect (OSTI)

    2011-12-15

    The Vision, Mission, and Goals of the Building Technologies Program (BTP) focus on short term energy efficiency outcomes such as improved economic environment, enhanced comfort, and affordability that collectively benefit our nation. Long-term goals focus on helping secure our nation's energy independence.

  14. Mission analysis report - deactivation facilities at Hanford

    SciTech Connect (OSTI)

    Lund, D.P.

    1996-09-27

    This document examines the portion of the Hanford Site Cleanup Mission that deals with facility deactivation. How facilities get identified for deactivation, how they enter EM-60 for deactivation, programmatic alternatives to perform facility deactivation, the deactivation process itself, key requirements and objectives associated with the deactivation process, and deactivation planning are discussed.

  15. Draft Strategic Laboratory Missions Plan. Volume II

    SciTech Connect (OSTI)

    1996-03-01

    This volume described in detail the Department`s research and technology development activities and their funding at the Department`s laboratories. It includes 166 Mission Activity Profiles, organized by major mission area, with each representing a discrete budget function called a Budget and Reporting (B & R) Code. The activities profiled here encompass the total research and technology development funding of the laboratories from the Department. Each profile includes a description of the activity and shows how the funding for that activity is distributed among the DOE laboratories as well as universities and industry. The profiles also indicate the principal laboratories for each activity, as well as which other laboratories are involved. The information in this volume is at the core of the Strategic Laboratory Mission Plan. It enables a reader to follow funds from the Department`s appropriation to a specific activity description and to specific R & D performing institutions. This information will enable the Department, along with the Laboratory Operations Board and Congress, to review the distribution of R & D performers chosen to execute the Department`s missions.

  16. Cabazon Band of Mission Indians- 2011 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cabazon Band of Mission Indians' long-range goals are to become energy self-sufficient, foster economic diversity, grow jobs, and improve the well-being of members of the tribe as well as those in its region of Southern California.

  17. Environmental monitoring report on the US Department of Energy's Grand Junction Projects Office facility, Grand Junction, Colorado, for calendar year 1987

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    This report presents results of environmental monitoring activities conducted in 1987 at the US Department of Energy's (DOE) Grand Junction Projects Office (GJPO) Facility in Colorado. The site is included under the DOE's Defense Decontamination and Decommissioning (Defense D and D) Program.

  18. "The Voyager Mission to the Outer Planets and Interstellar Space...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Tour of the outer planets and are now exploring the outer regions of the heliosphere. Soon they will be the first man-made objects to enter and explore interstellar space....

  19. FFTF Plant transition mission analysis report

    SciTech Connect (OSTI)

    Lund, D.P.

    1995-05-25

    FFTF (Fast Flux Test Facility) is a 400-MW(t) sodium-cooled, fast flux test reactor at Hanford, designed to test fuels and materials for advanced nuclear power plants; it has no capability for generating electric power. Since a long-term mission could not be found for FFTF, it was placed in standby, and a recommendation was made that it be shut down. Purpose of the FFTF Transition Project is to prepare it for Decontamination and Decommissioning; this will be accomplished by establishing a passively safe and environmentally secure configuration, that can be preserved for several decades. This report presents the results of the mission analysis, which is required by Hanford systems engineering procedures.

  20. A small RTG for future planetary missions

    SciTech Connect (OSTI)

    Cockfield, R.D.; Kull, R.A.

    1997-01-01

    A design study was conducted to characterize conceptual designs for a small Radioisotope Thermoelectric Generator (RTG), one that might be suitable for future planetary missions. Conceptual design configurations were derived from the General Purpose Heat Source{emdash}RTG (GPHS-RTG), with the design goal of providing 70 watts of electrical power at the end of a ten year mission life. Design improvements for mass minimization were evaluated, considering also the technical risk of the corresponding engineering development required. It was concluded that an RTG mass of 18 kg could be achieved with moderate risk. Further studies are recommended to define in detail the testing and other development activities that would be required to bring the conceptual design for such an RTG to reality. {copyright} {ital 1997 American Institute of Physics.}

  1. Sandia National Laboratories: National Security Missions: International

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Homeland and Nuclear Security: Remote Sensing and Verification Programs Remote Sensing and Verification Remote Sensing and Verification Image We extend Sandia's 60-year heritage in nuclear detonation detection to develop, deliver, and provide mission expertise for advanced remote sensing systems to monitor worldwide activities of consequence to national security. We design and build satellite sensor payloads and ground-based systems for the detection of nuclear detonations. We develop and

  2. Our Mission | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Home Our Mission Established by Congress in 2000, NNSA is a semi-autonomous agency within the U.S. Department of Energy responsible for enhancing national security through the military application of nuclear science. NNSA maintains and enhances the safety, security, and effectiveness of the U.S. nuclear weapons stockpile without nuclear testing; works to reduce the global danger from weapons of mass destruction; provides the U.S. Navy with safe and effective nuclear propulsion; and responds to

  3. Integrated Safety Management Workshop - Building Mission Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integrated Safety Management Workshop - Building Mission Success Acting Deputy Secretary Jeff Kupfer addresses the audience at the 2008 ISM Workshop. Over 500 U.S. Department of Energy and contractor employees started the Labor Day weekend with safety in mind. Hosted by the U.S. Department of Energy's Idaho Operations Office, along with the prime contractors at the Idaho National Laboratory Site, the 2008 Integrated Safety Management Workshop, which was held in Idaho Falls, concluded Aug. 28.

  4. Integrated Safety Management- Building Mission Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ISM Integrated Safety Management- Building Mission Success Approximately 500 federal and contractor employees will arrive in Idaho Falls to participate in the 2008 Integrated Safety Management Workshop, beginning Aug. 25. Hosted by the U.S. Department of Energy�s Idaho Operations Office, along with the prime contractors at the Idaho National Laboratory Site, the workshop will serve as a forum for sharing safety related practices and lessons learned, while emphasizing the importance of the use

  5. Manzanita Band of Mission Indians- 2002 Project

    Broader source: Energy.gov [DOE]

    The Manzanita Band of Mission Indians ("the tribe") has long recognized that its reservation has an abundant wind resource that could be commercially utilized to its benefit. The tribe is now investigating the feasibility of commercial scale development of a wind power project on tribal lands. The proposed project is a joint effort between the tribe and its subcontractor and consultant, SeaWest Consulting.

  6. Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program, 1995-2002 Summary Report.

    SciTech Connect (OSTI)

    Hoffnagle, Timothy; Carmichael, Richard; Noll, William

    2003-12-01

    The Grande Ronde Basin once supported large runs of chinook salmon Oncorhynchus tshawytscha and estimated peak escapements in excess of 10,000 occurred as recently as the late 1950's (U.S. Army Corps of Engineers 1975). Natural escapement declines in the Grande Ronde Basin have been severe and parallel those of other Snake River populations. Reduced productivity has primarily been attributed to increased mortality associated with downstream and upstream migration past eight dams and reservoirs in the Snake and Columbia rivers. Reduced spawner numbers, combined with human manipulation of previously important spawning and rearing habitat in the Grande Ronde Basin, have resulted in decreased spawning distribution and population fragmentation of chinook salmon in the Grande Ronde Basin (Figure 1; Table 1). Escapement of spring/summer chinook salmon in the Snake River basin included 1,799 adults in 1995, less than half of the previous record low of 3,913 adults in 1994. Catherine Creek, Grande Ronde River and Lostine River were historically three of the most productive populations in the Grande Ronde Basin (Carmichael and Boyce 1986). However, productivity of these populations has been poor for recent brood years. Escapement (based on total redd counts) in Catherine Creek and Grande Ronde and Lostine rivers dropped to alarmingly low levels in 1994 and 1995. A total of 11, 3 and 16 redds were observed in 1994 in Catherine Creek, upper Grande Ronde River and Lostine River, respectively, and 14, 6 and 11 redds were observed in those same streams in 1995. In contrast, the maximum number of redds observed in the past was 505 in Catherine Creek (1971), 304 in the Grande Ronde River (1968) and 261 in 1956 in the Lostine River (Tranquilli et al 2003). Redd counts for index count areas (a standardized portion of the total stream) have also decreased dramatically for most Grande Ronde Basin streams from 1964-2002, dropping to as low as 37 redds in the 119.5 km in the index survey

  7. Idaho National Laboratory Mission Accomplishments, Fiscal Year 2015

    SciTech Connect (OSTI)

    Allen, Todd Randall; Wright, Virginia Latta

    2015-09-01

    A summary of mission accomplishments for the research organizations at the Idaho National Laboratory for FY 2015. Areas include Nuclear Energy, National and Homeland Security, Science and Technology Addressing Broad DOE Missions; Collaborations; and Stewardship and Operation of Research Facilities.

  8. Oak Ridge Community Meeting Focused on Enabling Future Missions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge Community Meeting Focused on Enabling Future Missions Oak Ridge Community Meeting Focused on Enabling Future Missions June 15, 2016 - 12:35pm Addthis OREM Manager Sue Cange ...

  9. Information Pods Inform Public on Savannah River Site Missions...

    Energy Savers [EERE]

    Information Pods Inform Public on Savannah River Site Missions Information Pods Inform Public on Savannah River Site Missions December 29, 2015 - 12:20pm Addthis SRNS Solid Waste ...

  10. Defense Program Awards of Excellence: Y-12 Uranium Mission Strategy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Making sure we can deliver enriched uranium for our missions is no easy task at a site ... necessary for success. The Enterprise's missions can't wait, so the team had to develop a ...

  11. Optical Payload for the STARE Mission (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Title: Optical Payload for the STARE Mission Space-based Telescopes for Actionable Refinement of Ephemeris (STARE) is a nano-sat based mission designed to better determine the ...

  12. DOE Gives Mission Support Alliance Top Safety Award

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. — The Department of Energy (DOE) has awarded contractor Mission Support Alliance (MSA) Star Status in the (DOE) Voluntary Protection Program (VPP) for its mission support services.

  13. RTGs Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    1993-10-01

    A small spacecraft design for the Pluto Fast Flyby (PFF) Mission is under study by the Jet Propulsion Laboratory (JPL) for the National Aeronautics and Space Administration (NASA), for a possible launch as early as 1998. JPL's 1992 baseline design calls for a power source able to furnish an energy output of 3963 kWh and a power output of 69 watts(e) at the end of the 9.2-year mission. Satisfying those demands is made difficult because NASA management has set a goal of reducing the spacecraft mass from a baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for the power source. To support the ongoing NASA/JPL studies, the Department of Energy's Office of Special Applications (DOE/OSA) commissioned Fairchild Space to prepare and analyze conceptual designs of radioisotope power systems for the PFF mission. Thus far, a total of eight options employing essentially the same radioisotope heat source modules were designed and subjected to thermal, electrical, structural, and mass analyses by Fairchild. Five of these - employing thermoelectric converters - are described in the present paper, and three - employing free-piston Stirling converters - are described in the companion paper presented next. The system masses of the thermoelectric options ranged from 19.3 kg to 10.2 kg. In general, the options requiring least development are the heaviest, and the lighter options require more development with greater programmatic risk. There are four duplicate copies

  14. Research Mission - Plasma Couette Experiment - Cary Forest Group - UW

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plasma Physics Research Mission UW Madison Plasma Couette Experiment Research Mission PCX HomeResearch MissionPhysics TopicsDeviceDiagnosticsContacts LinksPCX People CPLA Home Directory Publications Links University of Wisconsin Physics Department Department of Energy National Science Foundation Research Mission This work builds upon the excitement in recent years of using liquid metals to study the magnetorotational instability (MRI) and the very closely related process of magnetic field

  15. Hydraulic Institute Mission and Vision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission and Vision Hydraulic Institute Mission and Vision Mission: To be a value-adding resource to member companies and pump users worldwide by: * Developing and delivering comprehensive industry standards. * Expanding knowledge by providing education and tools for the effective application, testing, installation, operation and maintenance of pumps and pumping systems. * Serving as a forum for the exchange of industry information. B_Vision_&_Mission_of_Hydraulic_Institute.pdf (48.62 KB)

  16. Voluntary Protection Program Onsite Review, Hanford Mission Support

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract - October 2011 | Department of Energy Hanford Mission Support Contract - October 2011 Voluntary Protection Program Onsite Review, Hanford Mission Support Contract - October 2011 October 2011 Evaluation to determine whether Hanford Mission Support Contract is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during September 26-October 6, 2011, to determine whether Mission Support Alliance, LLC is continuing to perform at a level

  17. Trane - Advancing Today's Federal Government Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Trane - Advancing Today's Federal Government Mission Trane - Advancing Today's Federal Government Mission Document describes the qualification sheet for Trane - Advancing Today's Federal Government Mission. Download the Trane qualification sheet. (264.09 KB) More Documents & Publications Tribal Energy Project Development Through ESCOs Frequently Asked Questions about ESPCs Presentations from the Regional Small Business Summits

  18. Grand Challenges in Modeling, Simulation and Analysis: Extraction and Visualization of Power Systems

    SciTech Connect (OSTI)

    Fernandez, Steven J; Omitaomu, Olufemi A

    2010-01-01

    Threats to the national electric power grid often require the coupling of real-time state data with look-ahead or forecasting models to provide timely disruption warnings. However, successful accomplishment of this capability presents a grand challenge in modeling, simulation, and analysis. Analysis of inter-area oscillatory modes may provide a new path to anticipate power system stability and address this grand challenge. An algorithm is presented for the identification and analysis of such modes from high resolution phasor measurement data that might indicate a pathway to meet this grand challenge. The process outlined includes data collection, conditioning, extraction of the primary oscillatory frequency, and determination of participating areas of the system.

  19. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    SciTech Connect (OSTI)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years.

  20. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    SciTech Connect (OSTI)

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks

  1. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  2. SunShot Grand Challenge Summit: Bright Outlook to Achieve SunShot Goal |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Grand Challenge Summit: Bright Outlook to Achieve SunShot Goal SunShot Grand Challenge Summit: Bright Outlook to Achieve SunShot Goal May 30, 2014 - 2:15pm Addthis Watch the video above to learn more about the Energy Department's SunShot Initiative, a national collaborative effort to make solar energy cost-competitive with other forms of electricity. Minh Le Minh Le Deputy Director, Solar Energy Technologies Office Last week, hundreds of solar energy leaders gathered in

  3. SunShot Shoots for the Moon with First Grand Challenge Event | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with First Grand Challenge Event May 23, 2012 - 11:40am Addthis The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. Ramamoorthy

  4. Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A123 Systems Battery Plant | Department of Energy to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant September 10, 2010 - 12:00am Addthis Washington D.C. - This Monday, U.S. Energy Secretary Steven Chu will speak at the dedication ceremony for the largest lithium-ion automotive battery production facility in North America. Funded in part by $249 million from the

  5. Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    as a Feedstock | Department of Energy for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock August 28, 2014 - 12:33pm Addthis POET-DSM's Project LIBERTY in Emmetsburg, Iowa, will celebrate its grand opening September 3, 2014, becoming the first commercial-scale cellulosic ethanol plant to use corn waste as a feedstock. Developed through a joint venture between POET LLC in Sioux

  6. Restoring The Azimuthal Symmetry Of Charged Particle Lateral Density In The Range Of KASCADE-Grande

    SciTech Connect (OSTI)

    Sima, O.; Rebel, H.; Apel, W. D.; Bekk, K.; Bozdog, H.; Daumiller, K.; Doll, P.; Engel, R.; Engler, J.; Finger, M.; Gils, H. J.; Haungs, A.; Heck, D.; Huege, T.; Isar, P. G.; Klages, H. O.; Mathes, H. J.; Mayer, H. J.; Milke, J.; Nehls, S.

    2010-11-24

    KASCADE-Grande, an extension of the former KASCADE experiment, is a multi-component Extensive Air Shower (EAS) experiment located in Karlsruhe Institute of Technology (Campus North), Germany. An important observable for analyzing the EAS is the lateral density of charged particles in the intrinsic shower plane. This observable is deduced from the basic information provided by the Grande scintillators - the energy deposit - first in the observation plane, by using a Lateral Energy Correction Function (LECF), then in the intrinsic shower plane, by applying an adequate mapping procedure. In both steps azimuthal.

  7. Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A123 Systems Battery Plant | Department of Energy to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant September 10, 2010 - 12:00am Addthis Washington D.C. - This Monday, U.S. Energy Secretary Steven Chu will speak at the dedication ceremony for the largest lithium-ion automotive battery production facility in North America. Funded in part by $249 million from the

  8. Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Program, 2000 Annual Report.

    SciTech Connect (OSTI)

    Carmichael, Richard W.

    2003-03-01

    Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2000.

  9. Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.

    SciTech Connect (OSTI)

    Merker, Christopher

    1993-04-01

    This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

  10. The Planck Surveyor mission: astrophysical prospects

    SciTech Connect (OSTI)

    De Zotti, Gianfranco; Toffolatti, Luigi Toffolatti, Luigi Partridge, R. Bruce

    1999-05-01

    Although the Planck Surveyor mission is optimized to map the cosmic microwave background anisotropies, it will also provide extremely valuable information on astrophysical phenomena. We review our present understanding of Galactic and extragalactic foregrounds relevant to the mission and discuss on one side, Planck{close_quote}s impact on the study of their properties and, on the other side, to what extent foreground contamination may affect Planck{close_quote}s ability to accurately determine cosmological parameters. Planck{close_quote}s multifrequency surveys will be unique in their coverage of large areas of the sky (actually, of the full sky); this will extend by two or more orders of magnitude the flux density interval over which mm/sub-mm counts of extragalactic sources can be determined by instruments already available (like SCUBA) or planned for the next decade (like the LSA-MMA or the space mission FIRST), which go much deeper but over very limited areas. Planck will thus provide essential complementary information on the epoch-dependent luminosity functions. Bright radio sources will be studied over a poorly explored frequency range where spectral signatures, essential to understand the physical processes that are going on, show up. The Sunyaev-Zeldovich effect, with its extremely rich information content, will be observed in the direction of a large number of rich clusters of Galaxies. Thanks again to its all sky coverage, Planck will provide unique information on the structure and on the emission properties of the interstellar medium in the Galaxy. At the same time, the foregrounds are unlikely to substantially limit Planck{close_quote}s ability to measure the cosmological signals. Even measurements of polarization of the primordial Cosmic Microwave background fluctuations appear to be feasible. {copyright} {ital 1999 American Institute of Physics.}

  11. Equal Employment Opportunity: Collaborating for Mission Success

    National Nuclear Security Administration (NNSA)

    December 2013 Fiscal Year 2013 Equal Employment Opportunity: Collaborating for Mission Success NNSA EEO Program Office of Civil Rights, NNSA, NA 1.2 PO Box 5400 Albuquerque, NM 87185 Albuquerque Complex (505) 845-5517 Fax (505) 845-4963 TTY 866-872-1011 http://nnsa.energy.gov/aboutus/ouroperations/managementandbudget/civrights PAGE WELCOME, EQUAL EMPLOYMENT OPPORTUNITY MANAGER 3 EXECUTIVE SUMMARY 4-5 SNAP-SHOT, CHANGES FROM FISCAL YEAR 2009 TO FISCAL YEAR 2013 6-7 PERSONNEL BY PERCENTAGE 8

  12. Stellar compass for the Clementine Mission

    SciTech Connect (OSTI)

    Wilson, B.

    1994-11-15

    A CCD sensor with 42 x 28 degrees FOV and 576 x 384 pixels was built by the Advanced Technology Program (ATP) in the Physics Department at LLNL. That sensor, called the StarTracker camera, is used on the Clementine Lunar Mapping mission between January and May, 1994. Together with the Stellar Compass software, the StarTracker camera provided a way of identifying its orientation to within about 150 microradians in camera body pitch and yaw. This presentation will be an overview of basically how the Stellar Compass software works, along with showing some of its performance results.

  13. Reconciling BICEP2 and Planck results with right-handed Dirac neutrinos in the fundamental representation of grand unified E{sub 6}

    SciTech Connect (OSTI)

    Anchordoqui, Luis A.; Goldberg, Haim; Huang, Xing; Vlcek, Brian J.

    2014-06-17

    The tensor-to-scalar ratio (r=0.20{sub −0.05}{sup +0.07}) inferred from the excess B-mode power observed by the Background Imaging of Cosmic Extragalactic Polarization (BICEP2) experiment is almost twice as large as the 95% CL upper limits derived from temperature measurements of the WMAP (r<0.13) and Planck (r<0.11) space missions. Very recently, it was suggested that additional relativistic degrees of freedom beyond the three active neutrinos and photons can help to relieve this tension: the data favor an effective number of light neutrino species N{sub eff}=3.86±0.25. Since the BICEP2 ratio implies the energy scale of inflation (V{sub ∗}{sup 1/4}∼2×10{sup 16} GeV) is comparable to the grand unification scale, in this paper we investigate whether we can accommodate the required N{sub eff} with three right-handed (partners of the left-handed standard model) neutrinos living in the fundamental representation of a grand unified exceptional E{sub 6} group. We show that the superweak interactions of these Dirac states (through their coupling to a TeV-scale Z{sup ′} gauge boson) lead to decoupling of right-handed neutrino just above the QCD cross over transition: 175 MeV≲T{sub ν{sub R}{sup dec}}≲250 MeV. For decoupling in this transition region, the contribution of the three right-handed neutrinos to N{sub eff} is suppressed by heating of the left-handed neutrinos (and photons). Consistency (within 1σ) with the favored N{sub eff} is achieved for 4.5 TeV

  14. KEPLER MISSION STELLAR AND INSTRUMENT NOISE PROPERTIES

    SciTech Connect (OSTI)

    Gilliland, Ronald L.; Chaplin, William J.; Elsworth, Yvonne P.; Miglio, Andrea; Dunham, Edward W.; Argabright, Vic S.; Borucki, William J.; Bryson, Stephen T.; Koch, David G.; Walkowicz, Lucianne M.; Basri, Gibor; Buzasi, Derek L.; Caldwell, Douglas A.; Jenkins, Jon M.; Van Cleve, Jeffrey; Welsh, William F.

    2011-11-01

    Kepler mission results are rapidly contributing to fundamentally new discoveries in both the exoplanet and asteroseismology fields. The data returned from Kepler are unique in terms of the number of stars observed, precision of photometry for time series observations, and the temporal extent of high duty cycle observations. As the first mission to provide extensive time series measurements on thousands of stars over months to years at a level hitherto possible only for the Sun, the results from Kepler will vastly increase our knowledge of stellar variability for quiet solar-type stars. Here, we report on the stellar noise inferred on the timescale of a few hours of most interest for detection of exoplanets via transits. By design the data from moderately bright Kepler stars are expected to have roughly comparable levels of noise intrinsic to the stars and arising from a combination of fundamental limitations such as Poisson statistics and any instrument noise. The noise levels attained by Kepler on-orbit exceed by some 50% the target levels for solar-type, quiet stars. We provide a decomposition of observed noise for an ensemble of 12th magnitude stars arising from fundamental terms (Poisson and readout noise), added noise due to the instrument and that intrinsic to the stars. The largest factor in the modestly higher than anticipated noise follows from intrinsic stellar noise. We show that using stellar parameters from galactic stellar synthesis models, and projections to stellar rotation, activity, and hence noise levels reproduce the primary intrinsic stellar noise features.

  15. Identification of Mission Sensitivities with Mission Modeling from the One System Organization at Hanford - 13292

    SciTech Connect (OSTI)

    Belsher, Jeremy D.; Pierson, Kayla L.; Gimpel, Rod F.

    2013-07-01

    The Hanford site in southeast Washington contains approximately 207 million liters of radioactive and hazardous waste stored in 177 underground tanks. The U.S. Department of Energy's Office of River Protection is currently managing the Hanford waste treatment mission, which includes the storage, retrieval, treatment and disposal of the tank waste. Two recent studies, employing the modeling tools managed by the One System organization, have highlighted waste cleanup mission sensitivities. The Hanford Tank Waste Operations Simulator Sensitivity Study evaluated the impact that varying 21 different parameters had on the Hanford Tank Waste Operations Simulator model. It concluded that inaccuracies in the predicted phase partitioning of a few key components can result in significant changes in the waste treatment duration and in the amount of immobilized high-level waste that is produced. In addition, reducing the efficiency with which tank waste is retrieved and staged can increase mission duration. The 2012 WTP Tank Utilization Assessment concluded that flowsheet models need to include the latest low-activity waste glass algorithms or the waste treatment mission duration and the amount of low activity waste that is produced could be significantly underestimated. (authors)

  16. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    SciTech Connect (OSTI)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  17. Biofuels and Sustainable Development: An Executive Session on the Grand Challenges of the Sustainability Transition

    SciTech Connect (OSTI)

    Lee, Henry; Clark, William C.; Devereaux, Charan

    2008-05-20

    This report is the result of the second in a series of intense workshops and study sessions on Grand Challenges of the Sustainability Transition, organized by the Sustainability Science Program at Harvard University, hosted by Venice International University, and supported by the Italian Ministry of Environment, Land and Sea.

  18. Recovery sequences for a station blackout accident at the Grand Gulf Nuclear Station

    SciTech Connect (OSTI)

    Carbajo, J.J. [Martin Marietta Energy Systems, Oak Ridge, TN (United States)

    1995-12-31

    Recovery sequences for a low-pressure, short term, station blackout severe accident at the Grand Gulf power plant have been investigated using the computer code MELCOR, version 1.8.3 PN. This paper investigates the effect of reflood timing and mass flow rate on accident recovery.

  19. Project Reports for Grand Traverse Band of Ottawa and Chippewa Indians- 2005 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Grand Traverse Band of Ottawa and Chippewa Indians (GTB) will conduct a feasibility study to determine the cost effectiveness and other economic, environmental, cultural, and social benefits of maximizing the diversity of energy sources used at GTB facilities. This includes an assessment of energy conservation measures as well as renewable energy sources such as wind, solar, and biomass.

  20. EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug-in Electric Vehicles

    Office of Energy Efficiency and Renewable Energy (EERE)

    EV Everywhere is a Clean Energy Grand Challenge to have the U.S. become the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years.

  1. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  2. EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington.

  3. Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Programs, 1999 Annual Report.

    SciTech Connect (OSTI)

    Carmichael, Richard W.

    2003-03-01

    Permit Number 1011 (formerly Permit No. 973) authorized ODFW to take listed spring chinook salmon juveniles from Catherine Creek and the Lostine and Grande Ronde rivers for scientific research and enhancement purposes. Special condition 2a specified the need for an annual report prior to initiation of next year's work.

  4. Grand Opening of Abengoa’s Biorefinery: Nation’s Third Commercial-Scale Facility

    Broader source: Energy.gov [DOE]

    The nation’s third commercial-scale cellulosic ethanol biorefinery celebrates its grand opening on October 17, 2014, in Hugoton, Kansas. The Abengoa Bioenergy Biomass of Kansas (ABBK) facility is the first of its kind to use a proprietary enzymatic hydrolysis process which turns cellulosic biomass into fermentable sugars that are then converted into transportation fuels.

  5. Comparative flow measurements: Grand Coulee pumping-generating plant unit P/G9. Final report

    SciTech Connect (OSTI)

    Heigel, L.; Lewey, A.B.; Greenwood, J.B.

    1986-10-01

    In extensive testing, two acoustic flow measurement systems compared well in accuracy and repeatability with conventional methods at a power plant at Grand Coulee Dam. Acoustic flow measurement systems offer utilities an inexpensive, real-time method for optimizing hydro plant efficiency.

  6. DOC-DOE China Mission Announcement Press Release | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    China Mission Announcement Press Release DOC-DOE China Mission Announcement Press Release DOC-DOE China Mission Announcement Press Release DOC-DOE China Mission Announcement Press Release (34.5 KB) More Documents & Publications DOC-DOE Joint China Mission Statement China 2015 Business Development Mission Marketing Flyer DOE-LPO_Email-Update_001_Through_11

  7. Power beaming: Mission enabling for lunar exploration

    SciTech Connect (OSTI)

    Bamberger, J.A.

    1992-01-01

    This paper explores several beam power concepts proposed for powering either lunar base or rover vehicles. At present, power requirements to support lunar exploration activity are met by integral self-contained power system designs. To provide requisite energy flexibility for human expansion into space, an innovative approach to replace on-board self-contained power systems is needed. Power beaming provides an alternative approach to supplying power that would ensure increased mission flexibility while reducing total mass launched into space. Providing power to the moon presents significant design challenges because of the duration of the lunar night. Power beaming provides an alternative to solar photovoltaic systems coupled with battery storage, radioisotope thermoelectric generation, and surface nuclear power. The Synthesis Group describes power beaming as a technology supporting lunar exploration. In this analysis beam power designs are compared to conventional power generation methods.

  8. LLNL/LANS mission committee meeting

    SciTech Connect (OSTI)

    Burns, Michael J

    2010-12-06

    Recent events continue to show the national security imperative of the global security mission: (1) Fighting Proliferation - (a) At Yongbyon, 'a modern, industrial-scale U-enrichment facility w/2000 centrifuges' seen Nov. 2010, (b) In Iran, fueling began at Bushehr while P5+1/lran talks delayed to Dec. 2010; (2) Continuing need to support the warfighter and IC - (a) tensions on the Korean peninsula, (b) primitative IEDs a challenge in Afghanistan, (c) cyber command, (d)another Georgian smuggling event; and (3) Countering terrorisms on US soil - (a) toner cartridge bomb, (b) times square bomb, (c) christmas tree bomb. Joint Technical Operations Team (JTOT) and Accident Response Group (ARG) elements deployed to two East Coast locations in November to work a multi-weapon scenario. LANL provided 70% of on-duty field and reconstitution teams for both Marble Challenge 11-01 and JD 11-01. There were a total of 14 deployments in FY10.

  9. Nuclear Systems Powering a Mission to Mars | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Powering a Mission to Mars Nuclear Systems Powering a Mission to Mars November 28, 2011 - 11:23am Addthis Radioisotope Power Systems, a strong partnership between the Energy Department's Office of Nuclear Energy and NASA, has been providing the energy for deep space exploration. Assistant Secretary Lyons Assistant Secretary Lyons Assistant Secretary for Nuclear Energy Curiosity Mission: investigate whether the Gale Crater on Mars has ever offered environmental conditions that support the

  10. NNSA authorizes mission assignment transfer to Kansas City Plant | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) authorizes mission assignment transfer to Kansas City Plant Wednesday, June 25, 2014 - 1:05pm To improve efficiency across the nuclear security enterprise, NNSA recently transferred the mission assignment of several product families from Sandia National Laboratories to the Kansas City Plant. The mission reassignment better aligns responsibilities with each site's core competencies and will leverage Kansas City's Supply Chain Management systems and

  11. Research Mission - Rotating Wall Machine - UW Plasma Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Mission UW Madison Line Tied Reconnection Experiment Research Mission LTRX HomeResearch MissionLTRX DevicePhysics TopicsDiagnosticsLTRX GalleryLTRX People CPLA Home Directory Publications Links University of Wisconsin Physics Department Department of Energy National Science Foundation Background Magnetohydrodynamic (MHD) instability of current carrying plasmas is a topic of importance to astrophysical and laboratory plasmas. In the Sun, current driven MHD instability is believed

  12. Los Alamos laser selected for 2020 Mars mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos laser selected for 2020 Mars mission Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:September 2015 all issues All Issues » submit Los Alamos laser selected for 2020 Mars mission SuperCam builds upon the successful capabilities demonstrated aboard the Curiosity Rover during NASA's current Mars Mission September 2, 2014 An artist's rendering of the SuperCam instrument aboard the next generation Mars rover scheduled to visit the Red Planet in 2020 An

  13. Pump Systems Matter Mission and Vision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pump Systems Matter Mission and Vision Pump Systems Matter Mission and Vision Pump Systems Matter(tm) (PSM) places a primary focus on pump systems education and outreach and addresses energy savings and total cost of pump ownership. C_Vision_&_Mission_of_Pump_Systems_Matter.pdf (56.49 KB) More Documents & Publications Overview of Pump Systems Matter Hydraulic Institute Member Benefits Course Overview Pump Systems Matter Optimization

  14. A snapshot of NNSA's counterterrorism mission | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) A snapshot of NNSA's counterterrorism mission Friday, August 19, 2016 - 10:26am NNSA's mission of counterterrorism and counterproliferation is supported through innovative science and technology. Recently, Associate Administrator and Deputy Undersecretary for Counterterrorism and Counterproliferation Jay Tilden visited Oak Ridge National Laboratory (ORNL) and met with team members who support that important mission. From left, Tilden, ORNL Site Office Manager Johnny

  15. Los Alamos laser selected for 2020 Mars mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos laser selected for 2020 Mars mission Los Alamos laser selected for 2020 Mars mission SuperCam builds upon the successful capabilities demonstrated aboard the Curiosity Rover during NASA's current Mars Mission. July 31, 2014 An artist's rendering of the SuperCam instrument aboard the next generation Mars rover scheduled to visit the Red Planet in 2020. An artist's rendering of the SuperCam instrument aboard the next generation Mars rover scheduled to visit the Red Planet in 2020.

  16. Sustainability Assessment of Workforce Well-Being and Mission Readiness |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sustainability Assessment of Workforce Well-Being and Mission Readiness Sustainability Assessment of Workforce Well-Being and Mission Readiness Presentation by Dr. Jodi Jacobsen, Associate Professor, University of Maryland, Baltimore September 2008 Sustainability Assessment of Workforce Well-being and Mission Readiness (1.21 MB) More Documents & Publications Moving Away from Silos Health and Productivity Questionnaire (HPQ) Survey Report Focus Group Meeting

  17. Announcing "Mission Innovation" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announcing "Mission Innovation" Announcing "Mission Innovation" November 29, 2015 - 7:00pm Addthis At the United Nations climate change conference in Paris, President Obama joins world leaders from 19 other countries to launch "Mission Innovation," a new initiative aimed at dramatically accelerating public and private global clean energy research and development. David Turk David Turk Deputy Assistant Secretary for International Climate and Technology Paul Bodnar

  18. Innovation for EM Mission Success | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovation for EM Mission Success Innovation for EM Mission Success Presentation from the 2015 DOE National Cleanup Workshop by Dr. Terry Michalski, Director, Savannah River National Laboratory. Innovation for EM Mission Success (1.14 MB) More Documents & Publications PRESENTATION: OVERVIEW OF PROPOSED "DARPA-INSPIRED" APPROACH TO ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) Chairs Meeting - June 2011

  19. Powering Curiosity: Multi-Mission Radioisotope Thermoelectric Generators |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Powering Curiosity: Multi-Mission Radioisotope Thermoelectric Generators Powering Curiosity: Multi-Mission Radioisotope Thermoelectric Generators January 29, 2008 - 7:06pm Addthis Mars Science Laboratory, aka Curiosity, is part of NASA's Mars Exploration Program, a long-term program of robotic exploration of the Red Planet. It's powered by the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG). Photo courtesy of NASA/JPL-Caltech. Mars Science Laboratory, aka

  20. Optical Payload for the STARE Mission (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Space-based Telescopes for Actionable Refinement of Ephemeris (STARE) is a nano-sat based mission designed to better determine the trajectory of satellites and space debris ...

  1. Exoplanet Science from NASAs Kepler Mission

    SciTech Connect (OSTI)

    Steffen, Jason

    2012-09-12

    NASA's exoplanet mission is the world's premier instrument for the discovery and study of planets orbiting distant stars. As the nominal mission comes to a close, Kepler has discovered nearly 2500 planet candidates, confirmed dozens of multi-planet systems, provided important insights into the orbital architectures of planetary systems, identified specific systems that challenge theories of planet formation and dynamical evolution, has revolutionized our understanding of stellar interiors, and is gearing to measure the frequency of Earth-like planets in the habitable zones of Sun-like stars in its extended mission phase. I present the most recent results from the Kepler mission.

  2. Nuclear Risk Assessment for the Mars 2020 Mission Environmental...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Nuclear Risk Assessment for the Mars 2020 Mission Environmental Impact Statement Citation Details In-Document Search Title: Nuclear Risk Assessment for the Mars ...

  3. NNSA's work and missions help save the earth | National Nuclear...

    National Nuclear Security Administration (NNSA)

    ... while powering the mission and giving back to the grid through a wind energy program. ... the highest level of sustainability certification and for its green fleet of vehicles. ...

  4. Voluntary Protection Program Onsite Review, Mission Support Alliance...

    Office of Environmental Management (EM)

    Llc, Volpentest Hazardous Materials Management and Emergency Response (Hammer), Federal Training Center - September 2014 Voluntary Protection Program Onsite Review, Mission Support...

  5. Northern New Mexico Citizens' Advisory Board BYLAWS I. MISSION

    Office of Environmental Management (EM)

    Northern New Mexico Citizens' Advisory Board BYLAWS I. MISSION The responsibility of the Environmental Management Site Specific Advisory Board (EM SSAB) at Northern New Mexico ...

  6. Using the NEPA Process to Further the Department's Mission and...

    Broader source: Energy.gov (indexed) [DOE]

    DOE's Assistant Secretary for Environment, Safety, and Health regarding ways to use the NEPA process to help accomplish the Department's mission, consistent with environmental...

  7. wh_mission_status.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    White House Mission Requests Memorandum FOIA-Summary of Findings: Circumstances surrounding decisions regarding the security clearance, access and work assignments FIA-16-0027 - In ...

  8. The JGI Mission and Programs (2009 JGI User Meeting)

    ScienceCinema (OSTI)

    Bristow, Jim

    2011-04-25

    Deputy Director of Programs Jim Bristow spoke about the DOE JGI's mission and programs at the 4th Annual User Meeting on March 25, 2009

  9. Mission Biofuels India Pvt Ltd MBIPL | Open Energy Information

    Open Energy Info (EERE)

    Biofuels India Pvt Ltd MBIPL Jump to: navigation, search Name: Mission Biofuels India Pvt Ltd (MBIPL) Place: Mumbai, Maharashtra, India Zip: 400076 Sector: Wind energy Product:...

  10. Department of Energy Strategic Plan Mission Card, May 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission: To ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges ... Goal 4: Management and Operational Excellence Establish ...

  11. Meeting PMU Data Quality Requirements for Mission Critical Application...

    Energy Savers [EERE]

    Meeting PMU Data Quality Requirements for Mission Critical Applications Anurag Srivastava School of Electrical Engineering and Computer Science Washington State University ...

  12. Joint Trade Mission to China | Department of Energy

    Energy Savers [EERE]

    mission to China focused on smart cities and green infrastructure. Secretary of Commerce Penny Pritzker and Deputy Secretary of Energy Elizabeth Sherwood-Randall are leading 25 ...

  13. Energy-Focused Trade Mission Will Yield Positive Effects for...

    Office of Environmental Management (EM)

    landed in China to lead a presidential trade mission focused on connecting U.S. businesses with opportunities in the green infrastructure and energy efficiency industries. ...

  14. Mission hazard assessment for STARS Mission 1 (M1) in the Marshall Islands area

    SciTech Connect (OSTI)

    Outka, D.E.; LaFarge, R.A.

    1993-07-01

    A mission hazard assessment has been performed for the Strategic Target System Mission 1 (known as STARS M1) for hazards due to potential debris impact in the Marshall Islands area. The work was performed at Sandia National Laboratories as a result of discussion with Kwajalein Missile Range (KMR) safety officers. The STARS M1 rocket will be launched from the Kauai Test Facility (KTF), Hawaii, and deliver two payloads to within the viewing range of sensors located on the Kwajalein Atoll. The purpose of this work has been to estimate upper bounds for expected casualty rates and impact probability or the Marshall Islands areas which adjoin the STARS M1 instantaneous impact point (IIP) trace. This report documents the methodology and results of the analysis.

  15. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  16. Lower Rio Grande Valley transboundary air pollution project (TAPP). Project report 1996--1997

    SciTech Connect (OSTI)

    Mukerjee, S.; Shadwick, D.S.; Dean, K.E.; Carmichael, L.Y.; Bowser, J.J.

    1999-04-01

    The Lower Rio Grande Valley Transboundary Air Pollution Project (TAPP) was a US-Mexico Border XXI project to find out if air pollutants were moving across the border from Mexico into the Lower Rio Grande Valley of Texas and to see what levels of air pollutants were present. Ambient measurements and meteorology were collected data for a year (March 1996-March 1997) at three fixed sites in and near Brownsville, Texas very close to the US-Mexico border on a continuous and 24-h internal basis. Overall levels of air pollution were similar to or lower than other areas in Texas and elsewhere. Based on wind sector analyses, transport of air pollution across the border did not appear to adversely impact air quality on the US side of the Valley. Southeasterly winds from the Gulf of Mexico were largely responsible for the clean air conditions.

  17. A simple grand canonical approach to compute the vapor pressure of bulk and finite size systems

    SciTech Connect (OSTI)

    Factorovich, Matas H.; Scherlis, Damin A.

    2014-02-14

    In this article we introduce a simple grand canonical screening (GCS) approach to accurately compute vapor pressures from molecular dynamics or Monte Carlo simulations. This procedure entails a screening of chemical potentials using a conventional grand canonical scheme, and therefore it is straightforward to implement for any kind of interface. The scheme is validated against data obtained from Gibbs ensemble simulations for water and argon. Then, it is applied to obtain the vapor pressure of the coarse-grained mW water model, and it is shown that the computed value is in excellent accord with the one formally deduced using statistical thermodynamics arguments. Finally, this methodology is used to calculate the vapor pressure of a water nanodroplet of 94 molecules. Interestingly, the result is in perfect agreement with the one predicted by the Kelvin equation for a homogeneous droplet of that size.

  18. University of Texas Rio Grande Valley Regional High School Science Bowl |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) University of Texas Rio Grande Valley Regional High School Science Bowl National Science Bowl® (NSB) NSB Home About Regional Competitions Rules, Forms, and Resources High School Regionals Middle School Regionals National Finals Volunteers Key Dates Frequently Asked Questions News Media Contact Us WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 E: Email Us

  19. University of Texas Rio Grande Valley Regional Middle School Science Bowl |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) University of Texas Rio Grande Valley Regional Middle School Science Bowl National Science Bowl® (NSB) NSB Home About Regional Competitions Rules, Forms, and Resources High School Regionals Middle School Regionals National Finals Volunteers Key Dates Frequently Asked Questions News Media Contact Us WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 E: Email

  20. Haze in the Grand Canyon: An evaluation of the Winter Haze Intensive Tracer Experiment

    SciTech Connect (OSTI)

    Not Available

    1990-10-01

    The Grand Canyon is one of the most spectacular natural sights on earth. Approximately 4 million visitors travel to Grand Canyon National Park (GCNP) each year to enjoy its majestic geological formations and intensely colored views. However, visibility in GCNP can be impaired by small increases in concentrations of fine suspended particles that scatter and absorb light; the resulting visibility degradation is perceived as haze. Sulfate particles are a major factor in visibility impairment at Grand Canyon in summer and winter. Many wintertime hazes at GCNP are believed to result from the accumulation of emissions from local sources during conditions of air stagnation, which occur more frequently in winter than in summer. In January and February 1987, the National Park Service (NPS) carried out a large-scale experiment known as the Winter Haze Intensive Tracer Experiment (WHITEX) to investigate the causes of wintertime haze in the region of GCNP and Canyonlands National Park. The overall objective of WHITEX was to assess the feasibility of attributing visibility impairment in specific geographic regions to emissions from a single point source. The experiment called for the injection of a tracer, deuterated methane (CD{sub 4}), into one of the stacks of the Navajo Generating Station (NGS), a major coal-fired power plant located 25 km from the GCNP boundary and 110 km northeast of Grand Canyon Village. A network of field stations was established in the vicinity -- mostly to the northeast of GCNP and NGS -- to measure CD{sub 4} concentrations, atmospheric aerosol and optical properties, and other chemical and physical attributes. 19 refs., 3 figs.

  1. Solid-State Lighting Technology: Current State of the Art and Grand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Challenges Technology: Current State of the Art and Grand Challenges - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear

  2. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    SciTech Connect (OSTI)

    Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2004-01-01

    This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

  3. DuPont’s Cellulosic Ethanol Grand Opening Marks a Milestone for the Advanced Biofuels Industry

    Office of Energy Efficiency and Renewable Energy (EERE)

    On a bright, crisp October morning in Iowa, I had the privilege to speak at the grand opening of DuPont’s cellulosic ethanol biorefinery—the fourth biorefinery of its kind in the United States and the largest in the world. This impressive plant is equipped to produce 30 million gallons of ethanol each year from the leftover stalks and leaves of the corn plant, called corn stover.

  4. U.S. Department of Energy at Grand Junction 2003 Annual Inspection⎯Monticello, Utah

    Office of Legacy Management (LM)

    at Grand Junction 2003 Annual Inspection⎯Monticello, Utah November 2003 Page 1 2003 Annual Inspection of the Monticello Mill Tailings (USDOE) and Monticello Radioactively Contaminated Properties Sites Summary The Monticello site, which includes the U.S. Department of Energy (DOE) Monticello Mill Tailings Site (MMTS) and the Monticello Radioactively Contaminated Properties site, was inspected September 23-25, 2003. A follow-up inspection of the Soil and Sediment properties was conducted on

  5. Grand Valley State University Checks Out Energy Savings at New Mary Idema Pew Library

    SciTech Connect (OSTI)

    none,

    2013-03-01

    Grand Valley State University (GVSU) partnered with the Department of Energy (DOE) to develop and implement solutions to build new, low-energy buildings that are at least 50% below Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of North America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) Program.

  6. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    SciTech Connect (OSTI)

    Johnson, Robert L.; Simmons, Mary Ann; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2005-02-25

    This report documents the fourth year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

  7. Habitat Evaluation Procedures (HEP) Report : Grand Coulee Dam Mitigation, 1996-1999 Technical Report.

    SciTech Connect (OSTI)

    Kieffer, B.; Singer, Kelly; Abrahamson, Twa-le

    1999-07-01

    The purpose of this Habitat Evaluation Procedures (HEP) study was to determine baseline habitat units and to estimate future habitat units for Bonneville Power Administration (BPA) mitigation projects on the Spokane Indian Reservation. The mitigation between BPA and the Spokane Tribe of Indians (STOI) is for wildlife habitat losses on account of the construction of Grand Coulee Dam. Analysis of the HEP survey data will assist in mitigation crediting and appropriate management of the mitigation lands.

  8. Key wintertime meteorological features of the Grand Canyon and the Colorado Plateaus Basin

    SciTech Connect (OSTI)

    Whiteman, C.D.; Allwine, K.J.

    1992-06-01

    In the winter of 1989--1990 a major meteorological and air pollution experiment was conducted in the Colorado Plateaus Basin (Richards et al., 1991). The focus of the experiment, conducted by Arizona's Soft River Project, was to investigate the influence of three 750-MW coal-fired power plant units at the Navajo Generating Station near Page, Arizona, on visibility at Grand Canyon National Park. As part of the meteorological experiment, surface and upper air data were collected from multiple sites within the basin. This data set is the most comprehensive meteorological data set ever collected within the region, and the purpose of this paper is to briefly summarize the key wintertime meteorological features of the Colorado Plateaus Basin and the Grand Canyon, through which the basin drains, using analyses of the Winter Visibility Study data. Our analyses focused primarily on thermally driven circulations within the basin and the Grand Canyon, but we also investigated the surface energy budget that drives these circulations and the interactions between the thermal circulations and the overlying synoptic-scale flows.

  9. Key wintertime meteorological features of the Grand Canyon and the Colorado Plateaus Basin

    SciTech Connect (OSTI)

    Whiteman, C.D.; Allwine, K.J.

    1992-06-01

    In the winter of 1989--1990 a major meteorological and air pollution experiment was conducted in the Colorado Plateaus Basin (Richards et al., 1991). The focus of the experiment, conducted by Arizona`s Soft River Project, was to investigate the influence of three 750-MW coal-fired power plant units at the Navajo Generating Station near Page, Arizona, on visibility at Grand Canyon National Park. As part of the meteorological experiment, surface and upper air data were collected from multiple sites within the basin. This data set is the most comprehensive meteorological data set ever collected within the region, and the purpose of this paper is to briefly summarize the key wintertime meteorological features of the Colorado Plateaus Basin and the Grand Canyon, through which the basin drains, using analyses of the Winter Visibility Study data. Our analyses focused primarily on thermally driven circulations within the basin and the Grand Canyon, but we also investigated the surface energy budget that drives these circulations and the interactions between the thermal circulations and the overlying synoptic-scale flows.

  10. National Uranium Resource Evaluation. Bibliographic index of Grand Junction office uranium reports

    SciTech Connect (OSTI)

    Johnson, J.B.

    1981-05-01

    In October 1978, Mesa College entered into subcontract with Bendix Field Engineering Corporation (BFEC) to prepare a bibliographic index of the uranium raw materials reports issued by the Grand Junction Office of the US Department of Energy (DOE). Bendix, prime contractor to the Grand Junction Office, operates the Technical Library at the DOE facility. Since the early 1950s, approximately 2700 reports have been issued by the Grand Junction Office. These reports were the results of uranium investigations conducted by federal agencies and their subcontractors. The majority of the reports cover geology, mineralogy, and metallurgy of uranium and/or thorium. No single, complete list of these reports existed. The purpose of this subcontract was to compile a comprehensive index to these reports. The Mesa College geology faculty worked with the BFEC and DOE staffs to develop the format for the index. Undergraduate geology students from Mesa compiled a master record sheet for each report. All reports issued up to January 1, 1979 were included in the bibliography. The bibliography is in preliminary, unedited form. It is being open-filed at this time, on microfiche, to make the information available to the public on a timely basis. The bibliography is divided into a master record list arranged in alpha-numeric order by report identification number, with separate indices arranged by title, author, state and county, 1/sup 0/ x 2/sup 0/ NTMS quadrangle, key words, and exploration area.

  11. Work plan for ground water elevation data recorder/monitor well injection at Grand Junction, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-07-18

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River. Data collection objectives (DCO) identify reasons for collecting data. The following are DCOs for the Grand Junction ground water elevation data recorder/monitor well installation project: long-term continuous ground water level data and periodic ground water samples will be collected to better understand the relationship between surface and ground water at the site; water level and water quality data will eventually be used in future ground water modeling to more firmly establish boundary conditions in the vicinity of the Grand Junction processing site; modeling results will be used to demonstrate and document the potential remedial alternative of natural flushing.

  12. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  13. Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  14. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect (OSTI)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  15. Final report of the radiological release survey of Building 19 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 19 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  16. Final report of the radiological release survey of Building 54 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 54 and the underlying soil were found not to be radiologically contaminated, and can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual release report for each GJO building.

  17. Final report of the radiological release survey of Building 29 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailing during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 29 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  18. Finite element analysis of the I-40 bridge over the Rio Grande

    SciTech Connect (OSTI)

    Farrar, C.R.; Duffey, T.A.; Goldman, P.A.; Jauregui, D.V.; Vigil, J.S.

    1996-01-01

    In the 1960s and 1970s numerous bridges were built in the US with a design similar to those on Interstate 40 (I-40) over the Rio Grande in Albuquerque, New Mexico. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway and Transportation Department (NMSH and TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture-critical bridges over the Rio Grande. Because the I-40 Bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce damage into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. A previous report (LA-12767-MS) summarizes the results of the experimental modal analyses. This report summarizes the numerical analyses of the bridges and compares the results of these analyses to the experimental results.

  19. Monitoring Fine Sediment; Grande Ronde and John Day Rivers, 2000 Annual Report.

    SciTech Connect (OSTI)

    Rhodes, Jonathan J.; Greene, M. Jonas; Purser, Michael D.

    2001-01-01

    Fine sediment in spawning substrate has a major effect on salmon survival from egg to smolt. Basin-wide restoration plans have established targets for fine sediment levels in spawning habitat. The project was initiated to monitor surface fine sediment levels and overwinter intrusion of fine sediment in spring chinook salmon spawning habitat in the North Fork John Day (NFJDR) and Grande Ronde Rivers, for five years. The project is also investigating the potential relationship between surface fine levels and overwinter sedimentation. It will provide data to assess trends in substrate conditions in monitored reaches and whether trends are consistent with efforts to improve salmon habitat conditions. The data on the magnitude of overwinter sedimentation will also be used to estimate salmon survival from egg to emergence. In Sept. 1998, 1999, and Aug. 2000, sites for monitoring overwinter sedimentation were established in salmon spawning habitat in the upper Grande Ronde River, Catherine Creek (a Grande Ronde tributary), the North Fork John Day River (NFJDR), and Granite Creek (a NFJDR tributary). Surface fine sediment levels were measured in these reaches via the grid method and visually estimated to test the relative accuracy of these two methods. In 1999 and 2000, surface fine sediment was also estimated via pebble counts at selected reaches to allow comparison of results among the methods. Overwintering substrate samples were collected in April 1999 and April-May 2000 to estimate the amount of overwinter sedimentation in clean gravels in spawning habitat. Monitoring methods and locations are described.

  20. Ecosystem level assessment of the Grand Calumet Lagoons, Indiana Dunes National Lakeshore

    SciTech Connect (OSTI)

    Stewart, P.M. [National Biological Service, Porter, IN (United States)

    1995-12-31

    The Grand Calumet Lagoons make up the eastern section of the Grand Calumet River (GCR), Indiana Harbor and Ship Canal and nearshore Lake Michigan Area of Concern (AOC). The GCR AOC is the only one of the 42 Great Lakes Areas of Concern identified by the International Joint Commission with all 14 designated uses classified as impaired. Included within the boundaries of the Indiana Dunes National Lakeshore (INDU), is the central section of the Grand Calumet Lagoons. A number of biotic and abiotic factors were tested to determine the effects of an industrial landfill that borders the lagoons to assess the potential impact on park resources. Analysis included water quality testing, assessments of macroinvertebrate, fish, algae and aquatic plant communities and contaminant concentrations in water, sediment and plant and fish tissue. Surface water testing found very few contaminants, but significantly higher nutrient levels were found in the water column closest to the landfill. Macroinvertebrate, aquatic plant and fish communities all showed significant impairment in relationship to their proximity to the landfill. Aquatic plant growth habit became limited next to the landfill with certain growth habits disappearing entirely. Aquatic plants collected close to the landfill had high concentrations of several heavy metals in their stems and shoots. Using the index of biotic integrity (IBI), fish community assessment indicated impairment in the areas adjacent to the landfill. Sediments tested at one site had over 12% polycyclic aromatic hydrocarbons (PAH) and carp (Cyprinus carpio) collected from this site had whole fish tissue concentrations over 1 mg/kg PAH.

  1. EIS-0126: Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this EIS to assess the environmental impacts of remediating the residual radioactive materials left from the inactive uranium processing site and associated properties located in Grand Junction, Colorado.

  2. Rocky Flats Plant: Test bed for transitioning from weapons production mission to environmental restoration, waste management, and economic development missions

    SciTech Connect (OSTI)

    Benjamin, A.; Murthy, K.S.; Krenzer, R.W.; Williams, R.E.; Detamore, J.A.; Brown, C.M.; Francis, G.E.; Lucerna, J.J.

    1993-01-07

    Redirection of Rocky Flats Plant`s (RF) mission is an inevitable result of changes in the worldwide social, political, and environmental factors. These changes were exemplified in the cancellation of the W-88 Warhead in January 1992, by the President of the United States. These unprecedented changes have altered the RF`s traditional nuclear weapons production mission to the transition mission, i.e., cleanup, preparation for deactivation and decontamination, decommissioning, dismantlement and demolition, and when appropriate, economic development, of the facilities. The purpose of this paper is to describe the essentials of the technical approach and management actions advanced by EG&G Rocky Flats, Inc., to organize, staff, direct, and control the activities necessary to transition the RF from its historical weapons production mission to the transition mission.

  3. Rocky Flats Plant: Test bed for transitioning from weapons production mission to environmental restoration, waste management, and economic development missions

    SciTech Connect (OSTI)

    Benjamin, A.; Murthy, K.S.; Krenzer, R.W.; Williams, R.E.; Detamore, J.A.; Brown, C.M.; Francis, G.E.; Lucerna, J.J.

    1993-01-07

    Redirection of Rocky Flats Plant's (RF) mission is an inevitable result of changes in the worldwide social, political, and environmental factors. These changes were exemplified in the cancellation of the W-88 Warhead in January 1992, by the President of the United States. These unprecedented changes have altered the RF's traditional nuclear weapons production mission to the transition mission, i.e., cleanup, preparation for deactivation and decontamination, decommissioning, dismantlement and demolition, and when appropriate, economic development, of the facilities. The purpose of this paper is to describe the essentials of the technical approach and management actions advanced by EG G Rocky Flats, Inc., to organize, staff, direct, and control the activities necessary to transition the RF from its historical weapons production mission to the transition mission.

  4. SunShot Initiative Mission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About the SunShot Initiative » SunShot Initiative Mission SunShot Initiative Mission Photo of a male silhouetted against a solar array. The SunShot Initiative's mission is to make solar energy fully cost-competitive with traditional energy sources before the end of this decade, making this clean renewable energy resource more affordable and accessible to Americans. Vision The SunShot Initiative vision is to make the total cost of solar energy fully economically-viable for everyday use, so that

  5. GE Researchers Tackle Three Unimpossible Missions | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Impact > Unimpossible Missions: GE researchers prove nothing is impossible Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) Unimpossible Missions: GE researchers prove nothing is impossible A team of GE researchers came together over the course of several months to tackle three seemingly impossible missions.

  6. Single-shell tank retrieval program mission analysis report

    SciTech Connect (OSTI)

    Stokes, W.J.

    1998-08-11

    This Mission Analysis Report was prepared to provide the foundation for the Single-Shell Tank (SST) Retrieval Program, a new program responsible for waste removal for the SSTS. The SST Retrieval Program is integrated with other Tank Waste Remediation System activities that provide the management, technical, and operations elements associated with planning and execution of SST and SST Farm retrieval and closure. This Mission Analysis Report provides the basis and strategy for developing a program plan for SST retrieval. This Mission Analysis Report responds to a US Department of Energy request for an alternative single-shell tank retrieval approach (Taylor 1997).

  7. Nuclear materials stewardship: Our enduring mission

    SciTech Connect (OSTI)

    Isaacs, T.H.

    1998-12-31

    The US Department of Energy (DOE) and its predecessors have handled a remarkably wide variety of nuclear materials over the past 50 yr. Two fundamental changes have occurred that shape the current landscape regarding nuclear materials. If one recognizes the implications and opportunities, one sees that the stewardship of nuclear materials will be a fundamental and important job of the DOE for the foreseeable future. The first change--the breakup of the Soviet Union and the resulting end to the nuclear arms race--altered US objectives. Previously, the focus was on materials production, weapon design, nuclear testing, and stockpile enhancements. Now the attention is on dismantlement of weapons, excess special nuclear material inventories, accompanying increased concern over the protection afforded to such materials; new arms control measures; and importantly, maintenance of the safety and reliability of the remaining arsenal without testing. The second change was the raised consciousness and sense of responsibility for dealing with the environmental legacies of past nuclear arms programs. Recognition of the need to clean up radioactive contamination, manage the wastes, conduct current operations responsibly, and restore the environment have led to the establishment of what is now the largest program in the DOE. Two additional features add to the challenge and drive the need for recognition of nuclear materials stewardship as a fundamental, enduring, and compelling mission of the DOE. The first is the extraordinary time frames. No matter what the future of nuclear weapons and no matter what the future of nuclear power, the DOE will be responsible for most of the country`s nuclear materials and wastes for generations. Even if the Yucca Mountain program is successful and on schedule, it will last more than 100 yr. Second, the use, management, and disposition of nuclear materials and wastes affect a variety of nationally important and diverse objectives, from national

  8. Mission Woods, Kansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    article is a stub. You can help OpenEI by expanding it. Mission Woods is a city in Johnson County, Kansas. It falls under Kansas's 3rd congressional district.12 References...

  9. Mission Hills, Kansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    article is a stub. You can help OpenEI by expanding it. Mission Hills is a city in Johnson County, Kansas. It falls under Kansas's 3rd congressional district.12 References...

  10. CRC handbook of NASA future missions and payloads

    SciTech Connect (OSTI)

    Hord, M.

    1986-01-01

    The author presents a detailed and quantitative description of all of the programs, systems, sensors and experiments associated with the next 30 years of space endeavors by the National Aeronautics and Space Administration. Derived from the fifth issue of the NASA Space Systems Technology Model, the missions and payloads are categorized by applications area: solar system exploration, astrophysics, earth sciences, communications, space transportation and utilization of the space environment. Far-term missions are described as opportunity missions and landmark missions, for the distant future. Technology requirements are collected by discipline: power, propulsion, materials, structures, information systems, navigation, guidance and control. Payload technology requirements are organized by instrument sensing range. This information defines in quantitative terms, the opportunities and limits for future civilian space system capabilities.

  11. Mission Bend, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    by expanding it. Mission Bend is a census-designated place in Fort Bend County and Harris County, Texas.1 References US Census Bureau 2005 Place to 2006 CBSA Retrieved...

  12. COLLOQUIUM: Dawn, the Asteroid Redirect Mission, and the Future...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 9, 2015, 2:00pm to 3:30pm Colloquia MBG Auditorium COLLOQUIUM: Dawn, the Asteroid Redirect Mission, and the Future of Solar Electric Propulsion Dr. John Brophy NASA Jet ...

  13. Research and Test Reactor Missions and the Conversion Program...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research and Test Reactor Missions and the Conversion Program from HEU to LEU Fuel July 5, ... Argonne leadership of the reactor conversion program has long focused on - and succeeded ...

  14. Project Reports for Campo Band of Mission Indians- 2010 Project

    Broader source: Energy.gov [DOE]

    The Campo Band of Mission Indians ("Band") goal is to develop a 300 MW wind energy project ("Kumeyaay Wind II") in two phases over the next two to five years.

  15. Mission & Functions Statement for the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    The mission of the Office of Environmental Management (EM) is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government...

  16. Nuclear electric propulsion for future NASA space science missions

    SciTech Connect (OSTI)

    Yen, Chen-wan L.

    1993-07-20

    This study has been made to assess the needs, potential benefits and the applicability of early (circa year 2000) Nuclear Electric Propulsion (NEP) technology in conducting NASA science missions. The study goals are: to obtain the performance characteristics of near term NEP technologies; to measure the performance potential of NEP for important OSSA missions; to compare NEP performance with that of conventional chemical propulsion; to identify key NEP system requirements; to clarify and depict the degree of importance NEP might have in advancing NASA space science goals; and to disseminate the results in a format useful to both NEP users and technology developers. This is a mission performance study and precludes investigations of multitudes of new mission operation and systems design issues attendant in a NEP flight.

  17. New Horizons Mission Powered by Space Radioisotope Power Systems |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Horizons Mission Powered by Space Radioisotope Power Systems New Horizons Mission Powered by Space Radioisotope Power Systems January 30, 2008 - 6:47pm Addthis Artist's concept of the New Horizons spacecraft during its planned encounter with Pluto and its moon, Charon. The craft's miniature cameras, radio science experiment, ultraviolet and infrared spectrometers and space plasma experiments are run by the Department of Energy's Radioisotope Thermoelectric Generator

  18. Mission | Center for Bio-Inspired Solar Fuel Production

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center Objective The Science Center Publications Graduate Research opportunities Undergraduate research opportunities EFRC-501 graduate class Seminar schedules Mission The Mission of the Center for Bio-Inspired Solar Fuel Production (BISfuel) is to construct a complete system for solar-powered production of fuels such as hydrogen via water splitting. Design principles will be drawn from the fundamental concepts that underlie photosynthetic energy conversion. A major challenge Center for

  19. Magellan Explores Cloud Computing for DOE's Scientific Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Explores Cloud Computing for DOE's Scientific Mission Magellan Explores Cloud Computing for DOE's Scientific Mission March 30, 2011 Cloud Control -This is a picture of the Magellan management and network control racks at NERSC. To test cloud computing for scientific capability, NERSC and the Argonne Leadership Computing Facility (ALCF) installed purpose-built testbeds for running scientific applications on the IBM iDataPlex cluster. (Photo Credit: Roy Kaltschmidt) Cloud computing is gaining

  20. Laboratory Directed Research and Development Mission | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration | (NNSA) Laboratory Directed Research & Development The U.S. Department of Energy (DOE) is charged with a large and complex mission: to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. The DOE executes this mission to a large extent at its 17 national laboratories, a group of institutions which were created and are supported by the federal government to perform

  1. Broader National Security Missions | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Broader National Security ... Broader National Security Missions Learn more For 70 years, the Y-12 National Security Complex has transformed in response to changing national security priorities and assigned missions, evolving technological opportunities, and growing concerns regarding health and public safety. As the global security situation has changed, the site has adapted - beginning as a uranium enrichment facility, transforming to a weapons manufacturing facility, and accepting new

  2. U. S. Department of Energy Savannah River Operations Office - Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Savannah River Operations Office Mission Welcome to the Savannah River Operations Office (DOE-SR) website. DOE-SR is a U.S. Department of Energy (DOE) organization that serves as the landlord for site resources and is responsible for overseeing the work performed by the Savannah River Site's (SRS) contractors. The Savannah River Site (SRS) is a key DOE industrial complex dedicated to; environmental cleanup, nuclear weapons stockpile stewardship, and nuclear materials disposition, in

  3. A Tale of 2 Missions (And Hopefully 2 Different Landings)

    SciTech Connect (OSTI)

    Wiens, Roger C.

    2012-07-19

    This talk, to be given at the LANL IGPP Annual Review dinner in Santa Fe, NM on July 17, 2012, highlights two important NASA missions LANL played a key role in: The Genesis mission was the first to return to Earth from beyond the Moon, bearing solar particles to help understand the composition of the Sun; and Curiosity, a 1-ton Mars rover launched to the red planet in 2011 with a suite of instruments from LANL called ChemCam.

  4. Late Pleistocene landslide-dammed lakes along the Rio Grande, White Rock Canyon, New Mexico

    SciTech Connect (OSTI)

    Reneau, S.L.; Dethier, D.P.

    1996-11-01

    Massive slump complexes composed of Pliocene basaltic rocks and underlying Miocene and Pliocene sediments flank the Rio Grande along 16 km of northern White Rock Canyon, New Mexico. The toe area of at least one slump complex was active in the late Pleistocene, damming the Rio Grande at least four times during the period from 18 to 12 {sup 14}C ka and impounding lakes that extended 10-20 km upriver. Stratigraphic relationships and radiocarbon age constraints indicate that three separate lakes formed between 13.7 and 12.4 {sup 14}C ka. The age and dimensions of the ca. 12.4 ka lake are best constrained; it had an estimated maximum depth of {approx}30 m, a length of {approx}13 km, a surface area of {approx}2.7 km{sup 2}, and an initial volume of {approx}2.5 x 10{sup 7} m{sup 3}. The youngest landslide-dammed lakes formed during a period of significantly wetter regional climate, strongly suggesting that climate changes were responsible for reactivation of the slump complexes. We are not certain about the exact triggering mechanisms for these landslides, but they probably involved removal of lateral support due to erosion of the slope base by the Rio Grande during periods of exceptionally high flood discharge or rapid incision; increased pore pressures associated with higher water tables; higher seepage forces at sites of ground-water discharge; or some combination of these processes. Seismic shaking could also have contributed to triggering of some of the landslides, particularly if aided by wet antecedent conditions. 54 refs., 19 figs., 3 tabs.

  5. Dynamic characterization and damage detection in the I-40 bridge over the Rio Grande

    SciTech Connect (OSTI)

    Farrar, C.R.; Baker, W.E.; Bell, T.M.; Cone, K.M.; Darling, T.W.; Duffey, T.A.; Eklund, A.; Migliori, A.

    1994-06-01

    In the 1960`s and 1970`s over 2500 bridges were built in the U.S. with a design similar to those on Interstate 40 over the Rio Grande in Albuquerque, New Mexico. These bridges were built without structural redundancy and typically have only two plate girders carrying the entire dead and live loads. Failure of either girder is assumed to produce catastrophic failure of the bridge, hence these bridges are referred to as fracture-critical bridges. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway and Transportation Department (NMSH&TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture critical bridges over the Rio Grande. Because the 1-40 bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce simulated fatigue cracks, similar to those observed in the field, into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. Scientists from the LANL`s Condensed Matter and Thermal Physics Group (P-10) applied state-of-the-art sensors and data acquisition software to the modal tests. Engineers from the LANL`s Advanced Engineering Technology Group (MEE-13) conducted ambient and forced vibration tests to verify detailed and simplified finite element models of the bridge. Forced vibration testing was done in conjunction with engineers from Sandia National Laboratory (SNL) who provided and operated a hydraulic shaker.

  6. Design and Analysis of RTGs for CRAF and Cassini Missions

    SciTech Connect (OSTI)

    Schock, Alfred; Noravian, Heros; Sankarankandath

    1990-11-30

    This report consists of two parts. Part 1 describes the development of novel analytical methods needed to predict the BOM performance and the subsequent performance degradation of the mutually obstructed RTGs for the CRAF and Cassini missions. Part II applies those methods to the two missions, presents the resultant predictions, and discusses their programmatic implications. The results indicate that JPL's original power demand goals could have been met with two standard GPHS RTGs for each mission. But subsequently JPL significantly increased both the power level and the mission duration for both missions, so that they can no longer by met by two standard RTGs. The resultant power gap must be closed either by reducing JPL's power demand (e.g., by decreasing contingency reserves) and/or by increasing the power system's output. One way under active consideration which more than meets the system power goal would be the addition of a third RTG for each mission. However, the author concluded that it may be possible to meet or closely approach the CRAF power demand goals with just two RTGs by relatively modest modification of their design and/or operating conditions. To explore that possibility, the effect of various modifications - either singly or in combination - was analyzed by Fairchild. The results indicate that modest modifications can meet or come very close to meeting the CRAF power goals with just two RTGs. Elimination of the third RTG would yield substantial cost and schedule savings. There are three copies in the file.

  7. Optimization of perigee burns for manned interplanetary missions

    SciTech Connect (OSTI)

    Madsen, W.W.; Olson, T.S.; Siahpush, A.S.

    1991-01-01

    In choosing an engine concept for the rocket vehicle to be used for the initial manned exploration of Mars, the two main factors in the decision should be what can be feasibly built and flight qualified within approximately the next 20 years, and what level of engine performance is required to safely perform these missions. In order to reduce the overall cost in developing this next generation space transportation system, it would be desirable to have a single engine design that could be used for a broad class of missions (for example, cargo and piloted lunar and Mars missions, orbit transfers around the Earth, and robotic missions to the planets). The engine thrust that is needed for manned Mars missions is addressed in this paper. We find that these missions are best served by a thrust level around 75,000 lbf to 100,000 lbf, and a thrust-to-engine weight ratio of about three. This thrust level might best be obtained by clustering five 15,000 lbf or 20,000 lbf engines. It may be better to throttle the engines back from full power between perigee burns, rather than shutting down. 5 refs., 4 figs.

  8. PCB usage at the Grand Junction Area Office Facility. Final report

    SciTech Connect (OSTI)

    Miller, M.E.; Donivan, S.

    1982-06-01

    The development, implementation, and results of the polychlorinated biphenyl (PCB) identification project at the Grand Junction Area Office (GJAO) are summarized. Methodology for the PCB analysis is described, and results are tabulated. Of the 51 transformers and disconnects in use at GJAO, 15 unites were determined to be PCB-contaminated or filled with PCBs. This number falls within EPA's estimate of 25 to 40 percent of all transformers in use being at least contaminated. Approximately 324 gallons of PCBs and 515 gallons of PCB-contaminated fluids are being used currently. No contaminated transformers or disconnects are in a position to contaminate food or feed products at the facility.

  9. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    SciTech Connect (OSTI)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  10. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    SciTech Connect (OSTI)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney Disposal Site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  11. 2014 SunShot Grand Challenge Summit Day Two Photos | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Day Two Photos 2014 SunShot Grand Challenge Summit Day Two Photos Addthis Day 2 Subprogram Overviews 9 1 of 39 Day 2 Subprogram Overviews 9 Photo Credit: SunShot Date taken: 2014-05-20 14:41 Day 2 Subprogram Overviews 8 2 of 39 Day 2 Subprogram Overviews 8 Photo Credit: SunShot Date taken: 2014-05-20 14:37 Day 2 Subprogram Overviews 7 3 of 39 Day 2 Subprogram Overviews 7 Photo Credit: SunShot Date taken: 2014-05-20 14:36 Day 2 Subprogram Overviews 6 4 of 39 Day 2 Subprogram Overviews 6 Photo

  12. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    SciTech Connect (OSTI)

    Johnson, Robert L. ); Simmons, Mary Ann ); Simmons, Carver S. ); McKinstry, Craig A. ); Cook, Chris B. ); Thorsten, Susan L. ); Lecaire, Richard; Francis, Stephen

    2003-01-29

    This report describes the work conducted during the second year of a multi-year study to assess the efficacy of a prototype strobe light system in eliciting a negative phototactic response in kokanee and rainbow trout. The strobe light system is being evaluated as a means to prevent entrainment (and subsequent loss) of fish at the entrance to the forebay adjacent to the third powerplant at Grand Coulee Dam. Pacific Northwest National Laboratory and the Confederated Tribes of the Colville Reservation are collaborating on the three-year study being conducted for the Bonneville Power Administration and the Northwest Power Planning Council.

  13. Communication: Reduced density matrices in molecular systems: Grand-canonical electron states

    SciTech Connect (OSTI)

    Bochicchio, Roberto C.; Miranda-Quintana, Ramn A.; Rial, Diego

    2013-11-21

    Grand-canonical like descriptions of many electron atomic and molecular open systems which are characterized by a non-integer number of electrons are presented. Their associated reduced density matrices (RDMs) are obtained by introducing the contracting mapping for this type of distributions. It is shown that there is loss of information when connecting RDMs of different order by partial contractions. The energy convexity property of these systems simplifies the description. Consequently, this formulation opens the possibility to a new look for chemical descriptors such as chemical potential and reactivity among others. Examples are presented to discuss the theoretical aspects of this work.

  14. 10 Questions for a Physicist: Antonio Checco

    Office of Energy Efficiency and Renewable Energy (EERE)

    Today, the Energy Blog is launching a new series, 10 Questions, with a simple goal in mind – to introduce you to our scientists and their incredible work. Dr. Checco explains wetting on the nanoscale, shares some advice for students and tells us about his favorite movie scientist.

  15. Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects

    SciTech Connect (OSTI)

    Spane, Frank A.

    2013-04-29

    Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects

  16. Network discovery, characterization, and prediction : a grand challenge LDRD final report.

    SciTech Connect (OSTI)

    Kegelmeyer, W. Philip, Jr.

    2010-11-01

    This report is the final summation of Sandia's Grand Challenge LDRD project No.119351, 'Network Discovery, Characterization and Prediction' (the 'NGC') which ran from FY08 to FY10. The aim of the NGC, in a nutshell, was to research, develop, and evaluate relevant analysis capabilities that address adversarial networks. Unlike some Grand Challenge efforts, that ambition created cultural subgoals, as well as technical and programmatic ones, as the insistence on 'relevancy' required that the Sandia informatics research communities and the analyst user communities come to appreciate each others needs and capabilities in a very deep and concrete way. The NGC generated a number of technical, programmatic, and cultural advances, detailed in this report. There were new algorithmic insights and research that resulted in fifty-three refereed publications and presentations; this report concludes with an abstract-annotated bibliography pointing to them all. The NGC generated three substantial prototypes that not only achieved their intended goals of testing our algorithmic integration, but which also served as vehicles for customer education and program development. The NGC, as intended, has catalyzed future work in this domain; by the end it had already brought in, in new funding, as much funding as had been invested in it. Finally, the NGC knit together previously disparate research staff and user expertise in a fashion that not only addressed our immediate research goals, but which promises to have created an enduring cultural legacy of mutual understanding, in service of Sandia's national security responsibilities in cybersecurity and counter proliferation.

  17. Characterization of Pump Flow at the Grand Coulee Pumping Station for Fish Passage, 2004

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Duncan, Joanne P.; Johnson, Robert L.

    2005-03-31

    This report describes a study conducted by PNNL for the Bonneville Power Administration to characterized the conditions fish experience when entrained in pump flow at the Grand Coulee Dam. PNNL used the Sensor Fish to measure the acceleration and pressure conditions that might be experienced by fish who are pulled through the pumps and turbines at Grand Coulee Dam's pump generation station and transported up into the feeder canal leading to Banks Lake. The probability that fish would be struck by the pump generating plant's new 9-bladed turbines was also calculated using Monte Carlo simulations. Our measurements showed relatively low turbulence except in the immediate vicinity of the runner environment. The highest pressure experienced by the Sensor Fish was estimated at 157 psi (the pressure gauge saturated at 155 psi). The probability of strike was also calculated, based on the average length of hatchery-reared juvenile kokanee (land-locked sockeye). Strike probabilities ranged from 0.755 for 2.36-inch fish to 0.3890 for 11.8-inch fish. The probability of strike estimates indicate that the majority (77%) of kokanne would be carried through the pump without being struck and most likely without injury resulting from pressure and turbulence exposure. Of the 23% that might be struck it is expected that 60% would arrive in Banks Lake without visible external injuries. Thus more than 90% of entrained fish would be expected to arrive in Banks Lake without injury.

  18. A Coupled Modeling System to Simulate Water Resources in the Rio Grande Basin

    SciTech Connect (OSTI)

    Bossert, J.E.; Breshears, D.D.; Campbell, K.; Costigan, K.R.; Greene, R.K.; Keating, E.H.; Kleifgen, L.M.; Langley, D.L.; Martens, S.N.; Sanderson, J.G.; Springer, E.P.; Stalker, J.R.; Tartakovsky, D.M.; Winter, C.L.; Zyvoloski, G.A.

    1999-01-11

    Limited availability of fresh water in arid and semi-arid regions of the world requires prudent management strategies from accurate, science-based assessments. These assessments demand a thorough understanding of the hydrologic cycle over long time periods within the individual water-sheds that comprise large river basins. Measurement and simulation of the hydrologic cycle is a tremendous challenge, involving a coupling between global to regional-scale atmospheric precipitation processes with regional to local-scale land surface and subsurface water transport. Los Alamos National Laboratory is developing a detailed modeling system of the hydrologic cycle and applying this tool at high resolution to assess the water balance within the upper Rio Grande river basin. The Rio Grande is a prime example of a river system in a semiarid environment, with a high demand from agricultural, industrial, recreational, and municipal interests for its water supply. Within this river basin, groundwater supplies often augment surface water. With increasing growth projected throughout the river basin, however, these multiple water users have the potential to significantly deplete groundwater resources, thereby increasing the dependence on surface water resources.

  19. Design and Analysis of RTGs for CRAF and Cassini Missions

    SciTech Connect (OSTI)

    Schock, Alfred; Noravian, Heros; Or, Chuen; Sankarankandath, Kumar

    1991-01-01

    The design and analysis of Radioisotope Thermoelectric Generators integrated with JPL's CRAF and Cassini spacecraft are described. The principal purposed of the CRAF mission are the study of asteroids and comets, and the principal purposes of the Cassini mission are the study of asteroids, Saturn, and its moons (particularly Titan). Both missions will employ the Mariner/Mark-2 spacecraft, and each will be powered by two GPHS-RTGs. JPL's spacecraft designers wish to locate the two RTGs in close proximity to each other, resulting in mutual and unsymmetrical obstruction of their heat rejection paths. To support JPL's design studies, the U.S. Department of Energy asked Fairchild to determine the effect of the RTGs' proximity on their power output. This required the development of novel analysis methods and computer codes, described in this report, for the coupled thermal and electrical analysis of obstructed RTGs with axial and circumferential temperature, voltage, and current variations. The code was validated against measured data of unobstructed RTG tests, and was used for the detailed analysis of the obstructed CRAF/Cassini RTGs. Also described is a new method for predicting the combined effect of fuel decay and thermoelectric degradation on the output of obstructed RTGs, which accounts for the effect of diminishing temperatures on degradation rates. The computed results indicate that for the 24-degree separation angle of JPL's baseline design, the mutually obstructed standard GPHS/RTGs show adequate power margins for the CRAF mission, but slightly negative margins for the Cassini mission.

  20. The Mission and Technology of a Gas Dynamic Trap Neutron Source for Fusion Material and Component Testing and Qualification

    SciTech Connect (OSTI)

    Ivanov, A; Kulcinski, J; Molvik, A; Ryutov, D; Santarius, J; Simonen, T; Wirth, B D; Ying, A

    2009-11-23

    The successful operation (with {beta} {le} 60%, classical ions and electrons with Te = 250 eV) of the Gas Dynamic Trap (GDT) device at the Budker Institute of Nuclear Physics (BINP) in Novosibirsk, Russia, extrapolates to a 2 MW/m{sup 2} Dynamic Trap Neutron Source (DTNS), which burns only {approx}100 g of tritium per full power year. The DTNS has no serious physics, engineering, or technology obstacles; the extension of neutral beam lines to steady state can use demonstrated engineering; and it supports near-term tokamaks and volume neutron sources. The DTNS provides a neutron spectrum similar to that of ITER and satisfies the missions specified by the materials community to test fusion materials (listed as one of the top grand challenges for engineering in the 21st century by the U.S. National Academy of Engineering) and subcomponents (including tritium-breeding blankets) needed to construct DEMO. The DTNS could serve as the first Fusion Nuclear Science Facility (FNSF), called for by ReNeW, and could provide the data necessary for licensing subsequent FSNFs.

  1. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  2. Scientific Grand Challenges: Crosscutting Technologies for Computing at the Exascale - February 2-4, 2010, Washington, D.C.

    SciTech Connect (OSTI)

    Khaleel, Mohammad A.

    2011-02-06

    The goal of the "Scientific Grand Challenges - Crosscutting Technologies for Computing at the Exascale" workshop in February 2010, jointly sponsored by the U.S. Department of Energy’s Office of Advanced Scientific Computing Research and the National Nuclear Security Administration, was to identify the elements of a research and development agenda that will address these challenges and create a comprehensive exascale computing environment. This exascale computing environment will enable the science applications identified in the eight previously held Scientific Grand Challenges Workshop Series.

  3. SP-100 planetary mission/system preliminary design study. Final report, technical information report

    SciTech Connect (OSTI)

    Jones, R.M.

    1986-02-01

    This report contains a discussion on many aspects of a nuclear electric propulsion planetary science mission and spacecraft using the proposed SP-100 nuclear power subsystem. A review of the science rationale for such missions is included. A summary of eleven nuclear electric propulsion planetary missions is presented. A conceptual science payload, mission design, and spacecraft design is included for the Saturn Ring Rendezvous mission. Spacecraft and mission costs have been estimated for two potential sequences of nuclear electric propulsion planetary missions. The integration issues and requirements on the proposed SP-100 power subsystems are identified.

  4. Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.

    SciTech Connect (OSTI)

    McGowan, Vance

    2003-08-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream and 22.9 acres

  5. Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-09

    BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability

  6. Unimpossible Missions: The University Edition | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Impact > Can you do the impossible? Enter our Unimpossible Missions: The University Edition challenge Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) Can you do the impossible? Enter our Unimpossible Missions: The University Edition challenge Earlier this year, three teams of GE Global Research

  7. Cabazon Band of Mission Indians Strategic Energy Plan Presentation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cabazon Band of Mission Indians Strategic Energy Plan Presentation Prepared by Philip Rentz 11/1/2004 2 Developed for the Cabazon Band of Mission Indians (CBMI) In Cooperation With The Department of Energy 11/1/2004 3 Site Location Maps 11/1/2004 4 Tribal Land 11/1/2004 5 Fantasy Springs Resort and Casino 11/1/2004 6 Cabazon Resource Recovery Park 11/1/2004 7 Organizational Chart 11/1/2004 8 Vision Statement The primary objective of the Strategic energy Plan is to aide in the social and economic

  8. Rio Grande Erosion Potential Demonstration - Report for the National Border Technology Program

    SciTech Connect (OSTI)

    JEPSEN, RICHARD A.; ROBERTS, JESSE D.; LANGFORD, RICHARD; GAILANI, JOSEPH

    2001-11-01

    This demonstration project is a collaboration among DOE, Sandia National Laboratories, the University of Texas, El Paso (UTEP), the International Boundary and Water Commission (IBWC), and the US Army Corps of Engineers (USACE). Sandia deployed and demonstrated a field measurement technology that enables the determination of erosion and transport potential of sediments in the Rio Grande. The technology deployed was the Mobile High Shear Stress Flume. This unique device was developed by Sandia's Carlsbad Programs for the USACE and has been used extensively in collaborative efforts on near shore and river systems throughout the United States. Since surface water quantity and quality along with human health is an important part of the National Border Technology Program, technologies that aid in characterizing, managing, and protecting this valuable resource from possible contamination sources is imperative.

  9. Assessment of cover systems at the Grand Junction, Colorado, uranium mill tailings pile: 1987 field measurements

    SciTech Connect (OSTI)

    Gee, G.W.; Campbell, M.D.; Freeman, H.D.; Cline, J.F.

    1989-02-01

    Four Pacific Northwest Laboratory (PNL) scientists and a technician conducted an onsite evaluation of radon gas exhalation, water content profiles, and plant and animal intrusion for a series of cover systems located on the uranium mill tailings pile at Grand Junction, Colorado. These six plots were sampled extensively down to the radon control layer (e.g., asphalt or wet clay) for soil moisture content and permeability. Radon gas emission through the surface was measured. Soil samples were collected and analyzed in the lab for particle-size distribution, particle density, bulk density, and ambient water content. Prairie dog burrows were excavated to discover the extent to which they penetrated the barriers. Plant type, density, and cover characteristics were measured.

  10. EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah

    Broader source: Energy.gov [DOE]

    The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Environmental Impact Statement and associated supplements and amendments provides information on the environmental impacts of the U.S. Department of Energy’s (DOE’s) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198, October 1996). The surface remediation alternatives analyzed in the EIS include on-site disposal of the contaminated materials and off-site disposal at one of three alternative locations in Utah using one or more transportation options: truck, rail, or slurry pipeline.

  11. Power council cites Tacoma homes - the Grand Coulee Dam of the future

    SciTech Connect (OSTI)

    Riley, M.

    1984-07-01

    The energy-efficient building codes adopted by Tacoma, Washington will give the city a reservoir of power comparable to the water stored behind Grand Coulee Dam. The code standards reduce energy requirements 60%, a saving that will continue through the 50- to 60-year service life of the houses. The first to adopt the Northwest Power Planning Council (NWPPC) Model Conservation Stardards, Tacoma recognized that current electric power surpluses are temporary and that conservation is the cheapest way to get new power. The city adopted the plan despite its low rates because economic growth is likely to come from power-intensive industries. A support package for the plan combines building code compliance, an information system, marketing, and financial incentives.

  12. Use of a dynamic simulation model to understand nitrogen cycling in the middle Rio Grande, NM.

    SciTech Connect (OSTI)

    Meixner, Tom; Tidwell, Vincent Carroll; Oelsner, Gretchen; Brooks, Paul; Roach, Jesse D.

    2008-08-01

    Water quality often limits the potential uses of scarce water resources in semiarid and arid regions. To best manage water quality one must understand the sources and sinks of both solutes and water to the river system. Nutrient concentration patterns can identify source and sink locations, but cannot always determine biotic processes that affect nutrient concentrations. Modeling tools can provide insight into these large-scale processes. To address questions about large-scale nitrogen removal in the Middle Rio Grande, NM, we created a system dynamics nitrate model using an existing integrated surface water--groundwater model of the region to evaluate our conceptual models of uptake and denitrification as potential nitrate removal mechanisms. We modeled denitrification in groundwater as a first-order process dependent only on concentration and used a 5% denitrification rate. Uptake was assumed to be proportional to transpiration and was modeled as a percentage of the evapotranspiration calculated within the model multiplied by the nitrate concentration in the water being transpired. We modeled riparian uptake as 90% and agricultural uptake as 50% of the respective evapotranspiration rates. Using these removal rates, our model results suggest that riparian uptake, agricultural uptake and denitrification in groundwater are all needed to produce the observed nitrate concentrations in the groundwater, conveyance channels, and river as well as the seasonal concentration patterns. The model results indicate that a total of 497 metric tons of nitrate-N are removed from the Middle Rio Grande annually. Where river nitrate concentrations are low and there are no large nitrate sources, nitrate behaves nearly conservatively and riparian and agricultural uptake are the most important removal mechanisms. Downstream of a large wastewater nitrate source, denitrification and agricultural uptake were responsible for approximately 90% of the nitrogen removal.

  13. CTUIR Grande Ronde River Watershed Restoration Program McCoy Creek/McIntyre Creek Road Crossing, 1995-1999 Progress Report.

    SciTech Connect (OSTI)

    Childs, Allen B.

    2000-08-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Bonneville Power Administration (BPA) entered into a contract agreement beginning in 1996 to fund watershed restoration and enhancement actions and contribute to recovery of fish and wildlife resources and water quality in the Grande Ronde River Basin. The CTUIR's habitat program is closely coordinated with the Grande Ronde Model Watershed Program and multiple agencies and organizations within the basin. The CTUIR has focused during the past 4 years in the upper portions of the Grande Ronde Subbasin (upstream of LaGrande, Oregon) on several major project areas in the Meadow, McCoy, and McIntyre Creek watersheds and along the mainstem Grande Ronde River. This Annual Report provides an overview of individual projects and accomplishments.

  14. Technical basis for radiological release of Grand Junction Office Building 2. Volume 2, dose assessment supporting data

    SciTech Connect (OSTI)

    1997-07-01

    The second volume of the Grand Junction Office Action Program Technical Basis for Radiological Release of Grand Junction Office Building 2 report includes the data quality objectives (DQO), sampling plan, collected data, and analysis used to model future radiation doses to members of the public occupying Building 2 on the U.S. Department of Energy (DOE) Grand Junction Office (GJO) site. This volume was assembled by extracting relevant components of the Grand Junction Projects Office Remedial Action Project Building 2 Public Dose Evaluation (DOE 1996) and inserting recent additional data that was gathered and dose pathway modeling that was performed. The intent of this document is to provide all derived guidance decisions, assumptions, measured data, testing results, and pathway modeling software input and output data that supports the discussion and determinations presented in Volume 1 of this report. For constructive employment of this document, the reader is encouraged to closely follow Volume 1 for proper association with the segment of information being examined.

  15. Sequence stratigraphic model of the Rio Grande Delta, south west Texas: Potential analog for the Niger Delta

    SciTech Connect (OSTI)

    Banfield, L.A.; Anderson, J.B.; Vail, P.R.

    1996-12-31

    A sequence stratigraphic model developed from the ancient Rio Grande Delta in South West Texas is suggested as an analog for the Niger Delta. The two delta systems are characterized by high sand bedloads, shale diapirism with associated listric normal faulting, and large amounts of tidal and wave influence forming lower coastal plains characterized by swamps and estuaries. The sequence stratigraphic model of the ancient Rio Grande delta is based on approximately 1200 kilometers of single channel, 15 cubic inch water gun data, lithologic descriptions from approximately 25 long cores (28-30 m) located in 17-94 meters water depth, three gamma ray logs, paleontologic data from two cores, and oxygen isotopic data from one core (152 meters in length and located in 94 meters water depth). The combined data indicate that considerable quantities of sand are sequestered on the continental shelf and point sourcing the slope. The Rio Grande sequence stratigraphic model provides an improved understanding of sand deposits on the shelf, of the role of sediment bypass during lowstands, and of the base of slope deposits formed by headward eroding canyons (?) or channels (?) located at the shelf break. This information regarding the distribution of sand in the Rio Grande system can provide valuable insight into the reservoir distribution in the Niger system, improving existing reservoir predictions.

  16. National Geothermal Association Trade Mission to Central America

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    The United States (US) geothermal industry, the world's most technically proficient, has been unable to achieve penetration into the markets of the developing nations. This report details the findings of an industry Trade Mission to Central America, tasked with determining the reasons for this shortfall and with developing a US industry geothermal export strategy designed to achieve immediate and long-term export benefits.

  17. Science Results from the Mars Exploration Rover Mission

    ScienceCinema (OSTI)

    Squyres, Steven [Cornell University, Ithaca, New York, United States

    2010-09-01

    One of the most important scientific goals of the mission was to find and identify a variety of rocks and soils that provide evidence of the past presence of water on the planet. To obtain this information, Squyres is studying the data obtained on Mars by several sophisticated scientific instruments.

  18. Project Reports for Cabazon Band of Mission Indians- 2011 Project

    Broader source: Energy.gov [DOE]

    The Cabazon Band of Mission Indians' long-range goals are to become energy self-sufficient, foster economic diversity, grow jobs, and improve the well-being of members of the tribe as well as those in its region of Southern California.

  19. Radioisotope Stirling Generator Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    2012-01-19

    The preceding paper described conceptual designs and analytical results for five Radioisotope Thermoelectric Generator (RTG) options for the Pluto Fast Flyby (PFF) mission, and the present paper describes three Radioisotope Stirling Generator (RSG) options for the same mission. The RSG options are based on essentially the same radioisotope heat source modules used in previously flown RTGs and on designs and analyses of a 75-watt free-piston Stirling engine produced by Mechanical Technology Incorporated (MTI) for NASA's Lewis Research Center. The integrated system design options presented were generated in a Fairchild Space study sponsored by the Department of Energy's Office of Special Applications, in support of ongoing PFF mission and spacecraft studies that the Jet Propulsion Laboratory (JPL) is conducting for the National Aeronautics and Space Administration (NASA). That study's NASA-directed goal is to reduce the spacecraft mass from its baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for a power source able to deliver 69 watts(e) at the end of the 9.2-year mission. In general, the Stirling options were found to be lighter than the thermoelectric options described in the preceding paper. But they are less mature, requiring more development, and entailing greater programmatic risk. The Stirling power system mass ranged from 7.3 kg (well below the 10-kg goal) for a non-redundant system to 11.3 kg for a redundant system able to maintain full power if one of its engines fails. In fact, the latter system could deliver as much as 115 watts(e) if desired by the mission planners. There are 2 copies in the file.

  20. Radioisotope Stirling Generator Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    1993-10-01

    The preceding paper described conceptual designs and analytical results for five Radioisotope Thermoelectric Generator (RTG) options for the Pluto Fast Flyby (PFF) mission, and the present paper describes three Radioisotope Stirling Generator (RSG) options for the same mission. The RSG options are based on essentially the same radioisotope heat source modules used in previously flown RTGs and on designs and analyses of a 75-watt free-piston Stirling engine produced by Mechanical Technology Incorporated (MTI) for NASA's Lewis Research Center. The integrated system design options presented were generated in a Fairchild Space study sponsored by the Department of Energy's Office of Special Applications, in support of ongoing PFF mission and spacecraft studies that the Jet Propulsion Laboratory (JPL) is conducting for the National Aeronautics and Space Administration (NASA). That study's NASA-directed goal is to reduce the spacecraft mass from its baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for a power source able to deliver 69 watts(e) at the end of the 9.2-year mission. In general, the Stirling options were found to be lighter than the thermoelectric options described in the preceding paper. But they are less mature, requiring more development, and entailing greater programmatic risk. The Stirling power system mass ranged from 7.3 kg (well below the 10-kg goal) for a non-redundant system to 11.3 kg for a redundant system able to maintain full power if one of its engines fails. In fact, the latter system could deliver as much as 115 watts(e) if desired by the mission planners. There are 5 copies in the file.