Powered by Deep Web Technologies
Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Comparing maintenance costs of geothermal heat pump systems with other HVAC systems: Preventive maintenance actions and total maintenance costs  

SciTech Connect

Total annual heating, ventilating, and air-conditioning (HVAC) maintenance costs were determined for 20 schools in the Lincoln, Nebraska, Public School District. Each school examined provides cooling to over 70% of its total floor area and relies on one of the following heating and cooling systems to provide the majority of space conditioning: vertical-bore, geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). A precursor to this study examined annual costs associated with repair, service, and corrective maintenance activities tracked in a work order database. This follow-up study examines costs associated with preventive maintenance (PM) activities conducted by the district. Annual PM costs were 5.87 {cents}/yr-ft{sup 2} (63.14 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 7.14 {cents}/yr-ft{sup 2} (76.86 {cents}/yr-m{sup 2}) for GHP, 9.82 {cents}/yr-ft{sup 2} (105.39 {cents}/yr-m{sup 2}) for WCC/ GSB, and 12.65 {cents}/yr-ft{sup 2} (136.30 {cents}/yr-m{sup 2}) for WCC/GHWB. The results of the two analyses are combined to produce an estimate of total annual maintenance costs, by system type, for the 20 schools. Total annual maintenance costs were 8.75 {cents}/yr-ft{sup 2} (94.20 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 9.27 {cents}/yr-ft{sup 2} (99.76 {cents}/yr-m{sup 2}) for GHP, 13.54 {cents}/yr-ft{sup 2} (145.49 {cents}/yr-m{sup 2}) for WCC/GSB, and 18.71 {cents}/yr-ft{sup 2} (201.61 {cents}/yr-m{sup 2}) for WCC/GHWB. It should be noted that these costs represent only the trends seen in the maintenance database of the Lincoln School District. Because of differences in the number of schools using each system type, varying equipment age, and the small total number of schools included in the study, the maintenance costs presented here may not be representative of the maintenance costs seen for similar equipment in other locations.

Martin, M.A.; Madgett, M.G.; Hughes, P.J.

2000-07-01T23:59:59.000Z

2

Maintenance cost studies of present aircraft subsystems  

E-Print Network (OSTI)

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

3

1998 Cost and Quality Annual  

Gasoline and Diesel Fuel Update (EIA)

8) 8) Distribution Category UC-950 Cost and Quality of Fuels for Electric Utility Plants 1998 Tables June 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts The annual publication Cost and Quality of Fuels for Electric Utility Plants (C&Q) is no longer published by the EIA. The tables presented in this document are intended to replace that annual publication. Questions regarding the availability of these data should

4

Energy and Maintenance Cost Savings Review at Several US ...  

Science Conference Proceedings (OSTI)

Presentation Title, Energy and Maintenance Cost Savings Review at Several US ... Weight-Time Curves Generated with the PoDFA / Prefil® Footprinter Method.

5

Update on maintenance and service costs of commercial building ground-source heat pump systems  

Science Conference Proceedings (OSTI)

An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

Cane, D.; Garnet, J.M.

2000-07-01T23:59:59.000Z

6

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

7

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network (OSTI)

The transportation infrastructure systems in the United States were built between the 50's and 80's, with 20 years design life. As most of them already exceeded their original life expectancy, state transportation agencies (STAs) are now under increased needs to rebuild deteriorated transportation networks. For major highway maintenance projects, a federal rule enforces to perform a life-cycle cost analysis (LCCA). The lack of analytical methods for LCCA creates many challenges of STAs to comply with the rule. To address these critical issues, this study aims at developing a new methodology for quantifying the future maintenance cost to assist STAs in performing a LCCA. The major objectives of this research are twofold: 1) identify the critical factors that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190,000 highway sections in Texas. These data were then grouped by critical performance-driven factor which was identified by K-means cluster analysis. Many factors were evaluated to identify the most critical factors that affect pavement maintenance need. With these data, a series of regression analyses were carried out to develop predictive models. Lastly, a validation study with PRESS statistics was conducted to evaluate reliability of the model. The research results reveal that three factors, annual average temperature, annual precipitation, and pavement age, were the most critical factors under very low traffic volume conditions. This research effort was the first of its kind undertaken in this subject. The maintenance cost lookup tables and stochastic model will assist STAs in carrying out a LCCA, with the reliable estimation of maintenance costs. This research also provides the research community with the first view and systematic estimation method that STAs can use to determine long-term maintenance costs in estimating life-cycle costs. It will reduce the agency's expenses in the time and effort required for conducting a LCCA. Estimating long-term maintenance cost is a core component of the LCCA. Therefore, methods developed from this project have the great potential to improve the accuracy of LCCA.

Kim, Yoo Hyun

2012-05-01T23:59:59.000Z

8

Installation, Operation, and Maintenance Costs for Distributed Generation Technologies  

Science Conference Proceedings (OSTI)

Distributed generation (DG) is a broad term that encompasses both mature and emerging onsite power generation technologies with power output as small as 1 kW and as large as 20 MW. While the equipment or purchase cost of a DG system is very important, installation, operation, and maintenance (IOM) costs also are significant and often overlooked. This report reviews IOM costs for both mature and emerging DG technologies. Some equipment cost data is included for reference, but is not the focus of this repo...

2003-02-03T23:59:59.000Z

9

Historical plant cost and annual production expenses for selected electric plants, 1982  

SciTech Connect

This publication is a composite of the two prior publications, Hydroelectric Plant Construction Cost and Annual Production Expenses and Thermal-Electric Plant Construction Cost and Annual Production Expenses. Beginning in 1979, Thermal-Electric Plant Construction Cost and Annual Production Expenses contained information on both steam-electric and gas-turbine electric plant construction cost and annual production expenses. The summarized historical plant cost described under Historical Plant Cost in this report is the net cumulative-to-date actual outlays or expenditures for land, structures, and equipment to the utility. Historical plant cost is the initial investment in plant (cumulative to the date of initial commercial operation) plus the costs of all additions to the plant, less the value of retirements. Thus, historical plant cost includes expenditures made over several years, as modifications are made to the plant. Power Production Expenses is the reporting year's plant operation and maintenance expenses, including fuel expenses. These expenses do not include annual fixed charges on plant cost (capital costs) such as interest on debt, depreciation or amortization expenses, and taxes. Consequently, total production expenses and the derived unit costs are not the total cost of producing electric power at the various plants. This publication contains data on installed generating capacity, net generation, net capability, historical plant cost, production expenses, fuel consumption, physical and operating plant characteristics, and other relevant statistical information for selected plants.

1984-08-20T23:59:59.000Z

10

Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.  

DOE Green Energy (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2005-12-01T23:59:59.000Z

11

Maintenance  

Science Conference Proceedings (OSTI)

Higher oil and labour costs, plus low quality fuel, demand that management takes a closer look at diesel engine lubrication. Problems of corrosion due to sulphur containing acids, oil analysis in order that it can be changed when necessary, filter analysis, use of multi-viscosity oil, and storage of oils are considered. A comprehensive lubricant conservation programme can reduce maintenance, labour costs and equipment downtime. Cleaning and replacement of bearings are discussed. Managing tire costs is also described.

Not Available

1981-06-01T23:59:59.000Z

12

EIA - Levelized Cost of New Generation Resources in the Annual ...  

U.S. Energy Information Administration (EIA)

Levelized Cost of New Generation Resources in the Annual Energy Outlook 2011. ... such as investment or production tax credits for specified generation sources, ...

13

Method for including operation and maintenance costs in the economic analysis of active solar energy systems  

DOE Green Energy (OSTI)

For a developing technology such as solar energy, the costs for operation and maintenance (O and M) can be substantial. In the past, most economic analyses included these costs by simply assuming that an annual cost will be incurred that is proportional to the initial cost of the system. However, in assessing the economics of new systems proposed for further research and development, such a simplification can obscure the issues. For example, when the typical method for including O and M costs in an economic analysis is used, the O and M costs associated with a newly developed, more reliable, and slightly more expensive controller will be assumed to increase - an obvious inconsistency. The method presented in this report replaces this simplistic approach with a representation of the O and M costs that explicitly accounts for the uncertainties and risks inherent in the operation of any equipment. A detailed description of the data inputs required by the method is included as well as a summary of data sources and an example of the method as applied to an active solar heating system.

Short, W.D.

1986-08-01T23:59:59.000Z

14

Definition: Reduced T&D Equipment Maintenance Cost | Open Energy  

Open Energy Info (EERE)

T&D Equipment Maintenance Cost T&D Equipment Maintenance Cost Jump to: navigation, search Dictionary.png Reduced T&D Equipment Maintenance Cost The cost of sending technicians into the field to check equipment condition is high. Moreover, to ensure that they maintain equipment sufficiently, and identify failure precursors, some utilities may conduct equipment testing and maintenance more often than is necessary. Online diagnosis and reporting of equipment condition would reduce or eliminate the need to send people out to check equipment resulting in a cost savings.[1] References ↑ SmartGrid.gov 'Description of Benefits' An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reduced_T%26D_Equipment_Maintenance_Cost&oldid=417296"

15

Operation and maintenance cost data for residential photovoltaic modules/panels  

DOE Green Energy (OSTI)

Burt Hill Kosar Rittelmann Associates has conducted a study to identify and estimate costs associated with the operation and maintenance of residential photovoltaic modules and arrays. Six basic topics related to operation and maintenance to photovoltaic arrays were investigated - General (Normal) Maintenance, Cleaning, Panel Replacement, Gasket Repair/Replacement, Wiring Repair/Replacement, and Termination Repair/Replacement. The effects of the mounting types - Rack Mount, Stand-Off Mount, Direct Mount, and Integral Mount - and the installation/replacement type - Sequential, Partial Interruption, and Independent - have been identified and described. Recommendation on methods of reducing maintenance costs are made.

None

1980-07-01T23:59:59.000Z

16

Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.  

SciTech Connect

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

Rowan, Gerald D.

1997-06-01T23:59:59.000Z

17

Combustion Turbine/Combined-Cycle Operations and Maintenance Cost Analyzer, Version 8.61  

Science Conference Proceedings (OSTI)

The CTCC O&M Cost Analyzer is a spreadsheet software product that estimates operations and maintenance (O&M) costs for combustion turbine and combined-cycle plants for specific gas turbine models over the operating life of the asset The CTCC O&M Cost Analyzer software contains powerful capabilities to assist users in evaluating non-fuel O&M costs and in supporting a life-cycle cost evaluation perspective.  The software uses a "bottoms-up" approach for ...

2013-05-06T23:59:59.000Z

18

Annual Report on U.S. Wind Power Installation, Cost, and Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 Title Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007...

19

Annual Report on U.S. Wind Power Installation, Cost, and Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006 Title Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006...

20

Gas turbine electric plant construction cost and annual production expenses. First annual publication, 1972  

SciTech Connect

By the end of 1972, gas turbine power plants owned and operated by U.S. utilities had a capacity of 27,918 MW. Data from the 1972 annual reports filed with the Federal Power Commission by utility systems are presented which show the plant cost, generating expenses, capacity and generation, and plant and equipment characteristics of 299 gas turbine plants. (LCL)

1972-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.  

DOE Green Energy (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see Table 5). Purchases are itemized in Appendix D and E. FishPro, Inc. assisted tribal staff with equipment purchases. The unspent contract balances will be carried forward to the ensuing year to complete equipment purchases essential to hatchery operations. The NPTH activities focused on completion of the Northwest Power Planning Council Step-3 decision that authorized hatchery construction. Construction began in July 2000. It is anticipated to continue through October 2002. At the end of 2001, the hatchery facilities were approximately 70% completed and the budget approximately 90% expended. The following facilities are either completed or in final stages of construction: (1) NPTH Central Hatchery facility at Site 1705, and (2) North Lapwai Valley satellite, and (3) Sweetwater Springs satellite, and (4) Yoosa-Camp satellite, and (5) Newsome Creek satellite, and (6) Lukes Gulch satellite, and (7) Cedar Flats satellite.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2006-03-01T23:59:59.000Z

22

THE COST OF MAINTENANCE TRANSFER UNDER LOAD TAP OF THE TRANSFORMERS POWER OF EXTRA HIGH VOLTAGE THE ELETRONORTE.  

E-Print Network (OSTI)

??In this work a methodology for reduction of maintenance cost in the on-load tap changers (OLTC) of extra high voltage is proposed. The methodology is… (more)

RAIMUNDO NONATO ROSA FILHO

2005-01-01T23:59:59.000Z

23

Reducing Operations and Maintenance Costs of Nuclear Power Plant Fire Protection Programs  

Science Conference Proceedings (OSTI)

This report discusses opportunities for utilities to reduce fire protection operations and maintenance (O&M) costs. A number of these opportunities have been implemented by some utilities and can be implemented now by others. Other opportunities can be implemented in the short term with some additional development. These other opportunities are amenable to cooperative projects with costs shared by multiple utilities. There is also a group of opportunities that are probably best developed on an industry w...

1997-01-08T23:59:59.000Z

24

Development of an Operations and Maintenance Cost Model to Identify Cost of Energy Savings for Low Wind Speed Turbines: July 2, 2004 -- June 30, 2008  

SciTech Connect

The report describes the operatons and maintenance cost model developed by Global Energy Concepts under contract to NREL to estimate the O&M costs for commercial wind turbine generator facilities.

Poore, R.

2008-01-01T23:59:59.000Z

25

Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.  

DOE Green Energy (OSTI)

Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

Larson, Roy Edward; Walker, Grant W.

2002-12-31T23:59:59.000Z

26

Predictive Maintenance Program: Development and Implementation  

Science Conference Proceedings (OSTI)

Many forces -- the economy, competition, regulatory agencies -- are pressuring utilities to reduce operating and maintenance (O&M) costs without cutting back on reliability or availability. Many utility managers are re-evaluating their maintenance strategies to meet these demands. To show utilities how to reduce maintenance costs and extend the effective operating life of equipment, EPRI has organized an annual workshop around a unique management approach -- Predictive Maintenance (PDM).

1999-06-25T23:59:59.000Z

27

Second Annual Maintenance, Inspection, and Test Report for PAS-1 Cask Certification for Shipping Payload B  

Science Conference Proceedings (OSTI)

The Nuclear Packaging, Inc. (NuPac), PAS-1 cask is required to undergo annual maintenance and inspections to retain certification in accordance with U.S. Department of Energy (DOE) Certificate of Compliance USA/9184B(U) (Appendix A). The packaging configuration being tested and maintained is the NuPac PAS-1 cask for Payload B. The intent of the maintenance and inspections is to ensure the packaging remains in unimpaired physical condition. Two casks, serial numbers 2162-026 and 2162-027, were maintained, inspected, and tested at the 306E Development, Fabrication, and Test Laboratory, located at the Hanford Site's 300 Area. Waste Management Federal Services, Inc. (WMFS), a subsidiary of GTS Duratek, was in charge of the maintenance and testing. Cogema Engineering Corporation (Cogema) directed the operations in the test facility. The maintenance, testing, and inspections were conducted successfully with both PAS-1 casks. The work conducted on the overpacks included weighing, gasket replacement, and plastic pipe plug and foam inspections. The work conducted on the secondary containment vessel (SCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, and a helium leak test. The work conducted on the primary containment vessel (PCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, dimensional inspection of the vessel bottom, a helium leak test, and dye penetrant inspection of the welds. The vermiculite material used in the cask rack assembly was replaced.

KELLY, D.J.

2000-10-09T23:59:59.000Z

28

Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy  

DOE Green Energy (OSTI)

Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

2013-07-01T23:59:59.000Z

29

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

to Drive Wind Development. . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with SiemensAnnual Report on U.S. Wind Power Installation, Cost, and

2008-01-01T23:59:59.000Z

30

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

2004-11-01T23:59:59.000Z

31

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

DOE Green Energy (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

Not Available

2004-11-01T23:59:59.000Z

32

Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.  

DOE Green Energy (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

2006-03-01T23:59:59.000Z

33

Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

2006-03-01T23:59:59.000Z

34

H2A Delivery: Miscellaneous Cost and H2 Losses  

NLE Websites -- All DOE Office Websites (Extended Search)

* Reviewed primarily to ensure that proper annual maintenance and repair costs for compressor - New value allowed longer compressor lifetime Forecourt Item New Old Notes...

35

Levelized Cost of New Generation Resources in the Annual Energy ...  

U.S. Energy Information Administration (EIA)

costs, the levelized cost ... 4 These results do not include targeted tax credits such as the production or investment tax credit available for some technologies.

36

SOLERAS - Solar-Powered Water Desalination Project at Yanbu: Forecasting models for operating and maintenance cost of the pilot plant  

Science Conference Proceedings (OSTI)

This study was conducted in cooperation with the Department of Industrial Engineering of King Abdulaziz University. The main objective of this study is to meet some of the goals of the Solar Energy Water Desalination Plant (SEWDP) plan in the area of economic evaluation. The first part of this project focused on describing the existing trend in the operation and maintenance (OandM) cost for the SOLERAS Solar Energy Water Desalination Plant in Yanbu. The second part used the information obtained on existing trends to find suitable forecasting models. These models, which are found here, are sensitive to changes in costs trends. Nevertheless, the study presented here has established the foundation for (OandM) costs estimating in the plant. The methodologies used in this study should continue as more data on operation and maintenance costs become available, because, in the long run, the trend in costs will help determine where cost effectiveness might be improved. 7 refs., 24 figs., 15 tabs.

Al-Idrisi, M.; Hamad, G.

1987-04-01T23:59:59.000Z

37

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Annual Report on U.S. Wind Power Installation, Cost, and3 U.S. Wind Power Capacity Increased by 27% inAre Significant. . . . . . . 9 Wind Power Prices Are Up in

2008-01-01T23:59:59.000Z

38

Annual Report on U.S. Wind Power Installation, Cost, and  

E-Print Network (OSTI)

industry trends · Evolution of wind pricing · Installed wind project costs · Wind turbine transaction turbines and projects over 50 kW in size · Data sources include AWEA, EIA, FERC, SEC, etc. (see full report PercentofAnnualCapacityAdditions 0 20 40 60 80 100 TotalAnnualCapacityAdditions(GW) Wind Other Renewable Gas

39

Cost and cost-effectiveness of standard methadone maintenance treatment compared to enriched 180-day methadone detoxification.  

E-Print Network (OSTI)

Theoretical foundations of cost-effectiveness analysis, in:B. & Weinstein, M. C. (Eds) Cost-effectiveness in health andK. L. & Hall, S. M. (1999) A cost-effectiveness and cost-

2004-01-01T23:59:59.000Z

40

UW Madison Fleet Fiscal Year 2010 Rates: Fuel, maintenance and insurance costs are included. If fuel prices exceed the budgeted  

E-Print Network (OSTI)

UW Madison Fleet Fiscal Year 2010 Rates: Fuel, maintenance and insurance costs are included. If fuel prices exceed the budgeted amount by a significant margin, the rates will be amended with a fuel surcharge at that time and the change notice will be posted in the fleet web site, rates page. Some rate

Sheridan, Jennifer

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2012  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2012-12-12T23:59:59.000Z

42

How much does it cost to generate electricity with different types ...  

U.S. Energy Information Administration (EIA)

How much does it cost to generate electricity with different types of power plants? EIA has historical data on the average annual operation, maintenance, ...

43

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

Wind Powering America (EERE)

  Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 006 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Increased by 7% in 006 . . . . . . . . . . . . . . . .4 The United States Leads the World in Annual Capacity Growth . . . . . . . .4 Texas, Washington, and California Lead the U.S. in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with Siemens Gaining Market Share . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Average Turbine Size Continues to Increase . . . . . . . . . . . . . . . . . . . . . . .7 Developer Consolidation Accelerates . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Innovation and Competition in Non-Utility Wind Financing Persists . . . .9

44

2 Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3  

E-Print Network (OSTI)

and Capital Costs Drive Wind Power Prices . . . . .20 Installed Project Costs Continued to Rise in 2007, After. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21 Project Cost Increases Are a Function of Turbine Prices, and Turbine Prices Have Increased . . . . . . . . . . . . . . .23 Operations and Maintenance Costs Are Affected by the Age and Size of the Project, Among Other

45

Hydroelectric plant construction cost and annual production expenses. Eighteenth annual supplement, 1974. [1974 data  

SciTech Connect

Tabulated data are presented on the generating capacity, construction costs, and production expenses for each of 432 conventional or pumped storage hydroelectric power plants in the U.S. (LCL)

1976-11-01T23:59:59.000Z

46

Ash Handling System Maintenance Guide  

Science Conference Proceedings (OSTI)

This Ash Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This guide will assist plant maintenance personnel in improving the reliability and reducing the maintenance costs for the ash handling system.

2005-12-23T23:59:59.000Z

47

Investigation of the Integration of Interstitial Building Spaces on Costs and Time of Facility Maintenance for U.S. Army Hospitals  

E-Print Network (OSTI)

The U.S. Army Medical Department (AMEDD) has used the interstitial building system (IBS) as a design component for some of the hospitals in its healthcare infrastructure portfolio. Department of Defense (DoD) leadership is aware of increases in healthcare costs and understands the importance of safely reducing costs, which may be possible through design initiatives. An analysis was performed on facility maintenance metrics for ten different U.S. Army hospitals, including IBS design and conventional / non-interstitial building system (NIBS) design. Statistical analysis indicated a significant difference in cost and time data between IBS and NIBS for most of the building systems considered (HVAC, electrical, plumbing, and interior). Scheduled maintenance for the plumbing building system was not found to have a significant difference in costs; scheduled maintenance for the HVAC and plumbing building system was not found to have a significant difference in time expended. The data in this study showed that facility maintenance cost and time were generally lower for IBS than NIBS. Time spent (and associated cost) for scheduled maintenance of the electrical and plumbing building systems were slightly higher in IBS, though not significantly higher for plumbing. It may be easier to reach the plumbing and electrical building systems due to the greater accessibility afforded by IBS design. While a cost premium is estimated for integrating IBS design, the savings provided by life cycle facility maintenance is estimated to be up to three and a half times the initial cost premium.

Leveridge, Autumn Tamara

2013-05-01T23:59:59.000Z

48

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011  

DOE Green Energy (OSTI)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

2012-01-01T23:59:59.000Z

49

A Winter Weather Index for Estimating Winter Roadway Maintenance Costs in the Midwest  

Science Conference Proceedings (OSTI)

Winter roadway maintenance budget data for the state of Iowa have been combined with available climate data for a 6-yr period to create a winter weather index that provides a useful assessment of winter severity. The weather index can be combined ...

Craig G. Carmichael; William A. Gallus Jr.; Bradley R. Temeyer; Mark K. Bryden

2004-11-01T23:59:59.000Z

50

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.  

DOE Green Energy (OSTI)

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

Wick, Mike

2008-12-30T23:59:59.000Z

51

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.  

DOE Green Energy (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

52

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.  

DOE Green Energy (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality (specifically dissolved oxygen and temperature) is the main limiting factor in our fisheries.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

53

Dynamic life-cycle costing in asset management of production equipments with emphasis om maintenance.  

E-Print Network (OSTI)

?? In the contemporary industry, companies need to make investments to grow their business volume. However each investment comes with its own risk. Cost of… (more)

Chaudhary, Osman

2011-01-01T23:59:59.000Z

54

Capital and Maintenance Projects for Efficiency Improvements  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) project developed a methodology to assess the costs and benefits of potential maintenance improvements to coal-fired power plants, refined the methodology developed in 2008 to assess the net annual benefit of potential capital improvements to these plants, and applied the methodologies to a hypothetical plant. The calculations are captured in two spreadsheets8212one for capital projects and the other for maintenance projects8212that are included in the report...

2009-10-13T23:59:59.000Z

55

Hydrogen Refueling Infrastructure Cost Analysis - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

9 9 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Marc W. Melaina (Primary Contact), Michael Penev and Darlene Steward National Renewable Energy Laboratory (NREL) 15013 Denver West Parkway Golden, CO 80401 Phone: (303) 275-3836 Email: Marc.Melaina@nrel.gov DOE Manager HQ: Fred Joseck Phone: (202) 586-7932 Email: Fred.Joseck@hq.doe.gov Subcontractor: IDC Energy Insights, Framingham, MA Project Start Date: October 1, 2010 Project End Date: September 28, 2012 Fiscal Year (FY) 2012 Objectives Identify the capacity (kg/day) and capital costs * associated with "Early Commercial" hydrogen stations (defined below) Identify cost metrics for larger numbers of stations and * larger capacities Technical Barriers This project addresses the following technical barriers

56

FMAC: Coal-Handling Maintenance Guide  

Science Conference Proceedings (OSTI)

The Coal Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for the coal handling system.

2006-12-22T23:59:59.000Z

57

Comparing Maintenance Costs of Geothermal Heat Pump Systems with other HVAC Systems in Lincoln Public Schools: Repair, Service, and Corrective Actions  

DOE Green Energy (OSTI)

The Lincoln Public School District, in Lincoln, Nebraska, recently installed vertical-bore geothermal heat pump systems in four, new, elementary schools. Because the district has consistent maintenance records and procedures, it was possible to study repair, service and corrective maintenance requests for 20 schools in the district. Each school studied provides cooling to over 70% of its total floor area and uses one of the following heating and cooling systems: vertical-bore geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACUGHWB), water-cooled chiller with gas-fired hot water boiler (WCCYGHWB), or water-cooled chiller with gas-fired steam boiler (WCUGSB). Preventative maintenance and capital renewal activities were not included in the available database. GHP schools reported average total costs at 2.13 cents/ft{sup 2}-yr, followed by ACC/GHWB schools at 2.88 cents/ft{sup 2}-yr, WCC/GSB schools at 3.73 cents/ft{sup 2}-yr, and WCC/GHWB schools at 6.07 cents/ft{sup 2}-yr. Because of tax-exemptions on material purchases, a reliance on in-house labor, and the absence of preventative maintenance records in the database, these costs are lower than those reported in previous studies. A strong relationship (R{sup 2}=O.52) was found between costs examined and cooling system age: the newer the cooling equipment, the less it costs to maintain.

Martin, M.A.; Durfee, D.J.; Hughes, P.J.

1999-06-19T23:59:59.000Z

58

An analysis of the impacts of economic incentive programs on commercial nuclear power plant operations and maintenance costs  

SciTech Connect

Operations and Maintenance (O and M) expenditures by nuclear power plant owner/operators possess a very logical and vital link in considerations relating to plant safety and reliability. Since the determinants of O and M outlays are considerable and varied, the potential linkages to plant safety, both directly and indirectly, can likewise be substantial. One significant issue before the US Nuclear Regulatory Commission is the impact, if any, on O and M spending from state programs that attempt to improve plant operating performance, and how and to what extent these programs may affect plant safety and pose public health risks. The purpose of this study is to examine the role and degree of impacts from state promulgated economic incentive programs (EIPs) on plant O and M spending. A multivariate regression framework is specified, and the model is estimated on industry data over a five-year period, 1986--1990. Explanatory variables for the O and M spending model include plant characteristics, regulatory effects, financial strength factors, replacement power costs, and the performance incentive programs. EIPs are found to have statistically significant effects on plant O and M outlays, albeit small in relation to other factors. Moreover, the results indicate that the relatively financially weaker firms are more sensitive in their O and M spending to the presence of such programs. Formulations for linking spending behavior and EIPs with plant safety performance remains for future analysis.

Kavanaugh, D.C.; Monroe, W.H. [Pacific Northwest Lab., Richland, WA (United States); Wood, R.S. [Nuclear Regulatory Commission, Washington, DC (United States)

1996-02-01T23:59:59.000Z

59

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections–2013: Supplemental Addition  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2013-12-17T23:59:59.000Z

60

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections, Volume 1: General Practices  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2013-12-23T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Mining Surveillance and Maintenance Dollars  

Science Conference Proceedings (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

62

Nuclear Maintenance Applications Center: Condenser Cleaning Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides power plant maintenance personnel with current maintenance information on condenser cleaning systems. The report will help these personnel to improve the reliability and reduce the maintenance costs for the condenser cleaning equipment used in power plants.

2007-12-21T23:59:59.000Z

63

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

64

Condenser Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Application and Maintenance Guide provides plant personnel with information on the operation, maintenance, and performance of condensers. The contents of this guide will assist plants in improving condenser performance, reducing maintenance costs, and increasing condenser reliability.

2001-08-23T23:59:59.000Z

65

Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994  

SciTech Connect

This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

Fisk, E.L.

1994-06-01T23:59:59.000Z

66

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Prices. . . . . 14 Installed Project Costs Are On the Rise,of Decline. . 15 Project Cost Increases Are a Function ofin installed wind project costs, wind turbine transaction

2008-01-01T23:59:59.000Z

67

Comparing maintenance costs of geothermal heat pump systems with other HVAC systems in Lincoln public schools: Repair, service, and corrective actions  

SciTech Connect

The Lincoln Public School District, in Lincoln, Nebraska, recently installed vertical-bore geothermal heat pump systems in four new elementary schools. Because the district has consistent maintenance records and procedures, it was possible to study repair, service, and corrective maintenance requests for 20 schools in the district. Each school studied provides cooling to over 70% of its total floor area and uses one of the following heating and cooling systems: vertical-bore geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), water-cooled chiller with gas-fired hot water boiler (WCC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). Preventative maintenance and capital renewal activities were not included in the available database. GHP schools reported average total costs at 2.13{cents}/ft{sup 2}-yr, followed by ACC/GHWB schools at 2.884{cents}/ft{sup 2}-yr, WCC/GSB schools at 3.73{cents}/ft{sup 2}-yr, and WCC/GHWB schools at 6.07{cents}/ft{sup 2}-yr. Because of tax exemptions on material purchases, a reliance on in-house labor, and the absence of preventative maintenance records in the database, these costs are lower than those reported in previous studies. A strong relationship (R{sup 2} = 0.52) was found between costs examined and cooling system age: the newer the cooling equipment, the less it costs to maintain.

Martin, M.A.; Durfee, D.J.; Hughes, P.J.

1999-07-01T23:59:59.000Z

68

Nuclear Maintenance Applications Center: Condenser Air Removal Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Air Removal Equipment Maintenance Guide provides power plant maintenance personnel with current maintenance information on this system. This guide will assist the plant maintenance personnel in improving reliability and reducing maintenance costs for the condenser air removal (CAR) equipment.

2007-12-21T23:59:59.000Z

69

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Sheet for 2013 Nissan Leaf Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 5142013 456 Replaced right front strut NC...

70

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

3CE000672 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6102013 7,426...

71

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0DU103929 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 342013 4,876 Replaced relay assembly, engine...

72

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

6DU111078 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,362 Changed oil - under warranty...

73

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XBU100914 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6192012 14,694 Replaced one tire and rotated...

74

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

2DU113491 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,466 Changed oil - under warranty...

75

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XDU104313 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2182013 8,513 Changed oil - under warranty...

76

Operation, Maintenance and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1988 Annual Report.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of juvenile steelhead and salmon. This report details the projects and maintenance done during 1988.

Lofy, Peter T.

1989-12-01T23:59:59.000Z

77

Operation, Maintenance, and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1987 Annual Report.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of juvenile steelhead and salmon. This report details the projects and maintenance done during 1987.

Lofy, Peter T.

1988-12-01T23:59:59.000Z

78

Stationery and Emerging Market Fuel Cell System Cost Analysis - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Kathya Mahadevan (Primary Contact), VinceContini, Matt Goshe, and Fritz Eubanks Battelle 505 King Avenue Columbus, OH 43201 Phone: (614) 424-3197 Email: mahadevank@battelle.org DOE Managers HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov GO: Reg Tyler Phone: (720) 356-1805 Email: Reginald.Tyler@go.doe.gov Contract Number: DE-EE0005250/001 Project Start Date: September 30, 2011 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives To assist the DOE in developing fuel cell systems for stationary and emerging markets by developing independent cost models and costs estimates for manufacture and

79

Low Wind Speed Technology Phase II: Development of an Operations and Maintenance Cost Model for LWST; Global Energy Concepts  

SciTech Connect

This fact sheet describes a subcontract with Global Energy Concepts to evaluate real-world data on O&M costs and to develop a working model to describe these costs for low wind speed sites.

Not Available

2006-03-01T23:59:59.000Z

80

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 006 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3  

E-Print Network (OSTI)

that Value . . . . . . . . . . . . . . . . . . . . . . . . . .13 Project Performance and Capital Costs Drive Wind Power Prices . . . . .14 Installed Project Costs Are On the Rise, After a Long Period of Decline. .15 Project Cost Increases Are a Function of Turbine Prices . . . . . . . . . . . .16 Wind Project

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

not represent wind energy generation costs, and generationXcel-UWIG We Energies Wind Capacity Penetration Cost ($/MWh)Wind Energy Program is currently funding additional efforts to better understand the drivers for O&M costs and

2008-01-01T23:59:59.000Z

82

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Cost, and Performance Trends: 2006 Contents Primary authorsCost, and Performance Trends: 2006 Introduction The winda rapid pace, keeping up with trends in the marketplace has

2008-01-01T23:59:59.000Z

83

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

and incentives, and continued uncertainty about the future cost and liabilities of conventional natural gas

2008-01-01T23:59:59.000Z

84

FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments.

Not Available

1994-11-01T23:59:59.000Z

85

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Increased by 27% in 2006 . . . . . . . . . . . . . . . .4 The United States Leads the World in Annual Capacity Growth . . . . . . . .4 Texas, Washington, and California Lead the U.S. in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with Siemens Gaining Market Share . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Average Turbine Size Continues to Increase . . . . . . . . . . . . . . . . . . . . . . .7 Developer Consolidation Accelerates . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Innovation and Competition in Non-Utility Wind Financing Persists . . . .9 Utility Interest in Wind Asset Ownership Strengthens; Community Wind Grows Modestly . . . . . . . . . . . .

86

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Surged by 46% in 2007, with 5,329 MW Added and $9 Billion Invested . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 Wind Power Contributed 35% of All New U.S. Electric Generating Capacity in 2007 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 The United States Continued to Lead the World in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 Texas Easily Exceeded Other States in Annual Capacity Growth . . . . . . .6 Data from Interconnection Queues Demonstrate that an Enormous Amount of Wind Capacity Is Under Development . . . . . . . . . .9 GE Wind Remained the Dominant Turbine Manufacturer, but a Growing Number of Other Manufacturers Are Capturing Market Share .

87

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

DOE Green Energy (OSTI)

This report--the first in what is envisioned to be an ongoing annual series--attempts to fill this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2006.

Wiser, R.; Bolinger, M.

2007-05-01T23:59:59.000Z

88

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Results from Major Wind Integration Studies Completed 2003-a mini- mum) show that wind integration costs are generallyA number of additional wind integration analyses are planned

2008-01-01T23:59:59.000Z

89

Impacts of increased outdoor air flow rates on annual HVAC energy costs in office environment.  

E-Print Network (OSTI)

??The use of different ventilation systems has an important impact on the energy cost of office buildings. This paper examines the relationship between heating and… (more)

Destrez, Adrien

2011-01-01T23:59:59.000Z

90

USE OF THE DRY MAINTENANCE FACILITY FOR HRT MAINTENANCE  

SciTech Connect

A portable shield was utilized in performing nine semidirect dry maintenance jobs on the HRT. The shield proved to be completely reliable, affording a considerable savings in maintenance costs and reactor downtime. (auth)

Jarvis, J.P.

1962-09-17T23:59:59.000Z

91

Hydrogen Storage Cost Analysis, Preliminary Results - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Brian D. James (Primary Contact), Andrew B. Spisak, Whitney G. Colella Strategic Analysis, Inc. 4075 Wilson Blvd. Suite 200 Arlington, VA 22203 Phone: (703) 778-7114 E-mail: bjames@sainc.com DOE Managers HQ: Grace Ordaz Phone: (202) 586-8350 Email: Grace.Ordaz@ee.doe.gov GO: Katie Randolph Phone: (720) 356-1759 Email: Katie.Randolph@go.doe.gov Contract Number: DE-EE0005253 Project Start Date: September 30, 2012 Project End Date: September 29, 2016 Fiscal Year (FY) 2012 Objectives Develop cost models of carbon fiber hydrogen storage * pressure vessels. Explore the sensitivity of pressure vessel cost to design * parameters including hydrogen storage quantity, storage

92

Annual  

NLE Websites -- All DOE Office Websites (Extended Search)

19 19 th Annual Triple "E" Seminar Presented by U.S. Department of Energy National Energy Technology Laboratory and Spectroscopy Society of Pittsburgh Thursday, January 20, 2011 8:00 a.m. Registration & Breakfast 8:30 a.m. Opening Remarks/Welcome Michael Nowak, Senior Management & Technical Advisor National Energy Technology Laboratory 8:35 a.m. Overview of Energy Issues Michael Nowak, Senior Management & Technical Advisor National Energy Technology Laboratory 8:45 a.m. Introduction of Presenters McMahan Gray National Energy Technology Laboratory 8:50 a.m. Jane Konrad, Pgh Regional Center for Science Teachers "Green - What Does it Mean" 9:45 a.m. Break 10:00 a.m. John Varine, Spectroscopy Society of Pittsburgh

93

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

94

Equipment Maintenance Optimization Manual Prototypes  

Science Conference Proceedings (OSTI)

This report provides detailed information to assist plant staff in performing recommended equipment maintenance tasks. It is a compilation of equipment maintenance optimization manual (EMOM) prototypes that include procedures and trouble shooting supported by broad-based utility experience. The EMOMs enable utility generation stations to: minimize operation and maintenance costs, including parts and labor; assist in maintenance planning, scheduling, and parts strategy; develop comprehensive maintenance m...

1999-11-24T23:59:59.000Z

95

Evaluation of a Low-Cost Salmon Production Facility, 1986 Annual Report.  

DOE Green Energy (OSTI)

This fiscal year 1986 study sponsored by the Bonneville Power Administration evaluates the presently existing, low-cost salmon production facility operated and maintained by the Clatsop Economic Development Committee's Fisheries Project.

Hill, James M.

1986-12-01T23:59:59.000Z

96

Evaluation of a Low-Cost Salmon Production Facility, 1985 Annual Report.  

DOE Green Energy (OSTI)

This fiscal year 1985 study sponsored by the Bonneville Power Administration evaluates the presently existing low-cost salmon production facility operated and maintained by the Clatsop Economic Development Committee Fisheries Project.

Hickerson, Andrew W.; Hill, James M.

1985-12-01T23:59:59.000Z

97

Evaluation of a Low-Cost Salmon Production Facility, 1984 Annual Report.  

DOE Green Energy (OSTI)

This fiscal year 1984 study sponsored by the Bonneville Power Administration evaluates the presently existing low-cost salmon production facility operated and maintained by the Clatsop Economic Development Committee's Fisheries Project.

Hickerson, Andrew W.; Hill, James M.

1984-12-01T23:59:59.000Z

98

Offshore software maintenance methodology  

Science Conference Proceedings (OSTI)

Keywords: maintenance methodology, offshore maintenance, remote maintenance, software economics, software maintenance

M. Pavan Kumar; V. Sita Rama Das; N. Netaji

1996-05-01T23:59:59.000Z

99

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0CE002590 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1252013 7,925 Changed oil and filter and...

100

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7CE000612 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1172013 6,327 Changed oil and filter and...

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

5CE002486 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 212013 7,892 Changed oil and filter and...

102

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

8BU100815 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 882012 17,160 Changed oil and filter and...

103

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU2A5010462 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 11232009 5,935 Changed oil and filter,...

104

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU5A0006063 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 8192009 5,090 Changed oil and filter and...

105

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP8D3038660 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6222013 6,331 5K service -...

106

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6132013 5,220 5K service - under...

107

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP6D3038663 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6122013 5,078 5K service -...

108

Cost and quality of fuels for electric utility plants: Energy data report. 1980 annual  

SciTech Connect

In 1980 US electric utilities reported purchasng 594 million tons of coal, 408.5 million barrels of oil and 3568.7 billion ft/sup 3/ of gas. As compared with 1979 purchases, coal rose 6.7%, oil decreased 20.9%, and gas increased for the fourth year in a row. This volume presents tabulated and graphic data on the cost and quality of fossil fuel receipts to US electric utilities plants with a combined capacity of 25 MW or greater. Information is included on fuel origin and destination, fuel types, and sulfur content, plant types, capacity, and flue gas desulfurization method used, and fuel costs. (LCL)

1981-06-25T23:59:59.000Z

109

Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994  

Science Conference Proceedings (OSTI)

The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

Anderson, L.A. [comp.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

1995-03-01T23:59:59.000Z

110

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft July 9, 2009 Draft July 9, 2009 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2009 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

111

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final July 01, 2010 Final July 01, 2010 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2010 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

112

Stationary Fuel Cell System Cost Analysis - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Brian D. James (Primary Contact), Andrew B. Spisak, Whitney G. Colella Strategic Analysis, Inc. 4075 Wilson Blvd. Suite 200 Arlington, VA 22203 Phone: (703) 778-7114 Email: bjames@sainc.com DOE Managers HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov GO: Gregory Kleen Phone: (720) 356-1672 Email: Gregory.Kleen@go.doe.gov Technical Advisor Bryan Pivovar Phone: (303) 275-3809 Email: bryan.pivovar@nrel.gov Sub-Contract Number No: AGB-0-40628-01 under Prime Contract No. DE-AC36-08G028308 Project Start Date: July 8, 2010 Project End Date: September 7, 2012 Fiscal Year (FY) 2012 Objectives Perform Design for Manufacturing and Assembly * (DFMA ® ) cost analysis for low-temperature (LT)

113

Annual Report on U.S. Wind Power Installation, Cost, and  

E-Print Network (OSTI)

transaction prices · Wind project performance · O&M cost trends · Integration/transmission/policy · Coming up is Reasonably Broad #12;10 Interest in Offshore Wind Continues in the U.S., but No Such Projects Are Yet Online · All wind projects installed in the U.S. to date are land-based · Some interest exists in offshore wind

114

10 MWe Solar Thermal Central Receiver Pilot Plant maintenance experience, January 1982-March 1983  

DOE Green Energy (OSTI)

This report presents a description of the maintenance experience at the 10 MWe Solar Thermal Central Receiver Pilot Plant near Barstow, California, during the period January 1982 through March 1983. The plant systems are briefly described, and statistical data on maintenance orders, labor requirements, and maintenance costs are presented. The data presented have been extracted from Southern California Edison historical maintenance records accumulated at the plant. Pilot plant systems requiring the most maintenance activity are identified so that efforts to reduce plant maintenance costs can be properly identified. The information is analyzed for the purpose of developing a data base for general use during the economic assessment, design, and staff planning of future solar central receiver plants. However, data presented here from the Pilot Plant should not be used for direct scaling of larger power production plants. The number and size of equipment items for larger plants will not scale, the designs will vary, and the Pilot Plant includes special testing and evaluation equipment which would not be necessary in plants built for the sole purpose of power production. Data taken at the Pilot Plant during the early plant startup and operational phase shows an annual maintenance cost of approximately one perent of the recurring plant capital cost. Similar costs for recent technology steam electric generating plants are estimated to range from 1.5 to 3%. The Pilot Plant maintenance cost will not appear as favorable if based on energy produced during power production due to the small plant size and equipment intensive nature of the plant. The solar-unique systems of the plant required 45% of the total plant maintenance labor and 39% of the total maintenance cost, both percentages being lower than anticipated.

Smith, J.W.

1985-05-01T23:59:59.000Z

115

Electric Motor Tiered Maintenance Program  

Science Conference Proceedings (OSTI)

Electric motor predictive and preventive maintenance guidance has been developed to provide information to help maximize motor reliability and to minimize the need for major motor repairs. However, if all recommendations presented in most guides are followed and applied to all motors, the cost of motor maintenance would be unwieldy and consume more than its share of maintenance budgets.

2002-08-27T23:59:59.000Z

116

Compressed Air System Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Compressed Air System Maintenance Guide" provides fossil plant personnel with information on the operation and maintenance of the compressed air system. The contents of this guide will assist personnel in improving performance of the compressed air system, reducing maintenance costs, and increasing air system reliability.

2002-11-27T23:59:59.000Z

117

Electric Motor Predictive and Preventive Maintenance Guide  

Science Conference Proceedings (OSTI)

Electric motor failure could result in lost capacity as well as excessive repair and maintenance costs. This guide provides information on establishing an effective maintenance program to help prevent unexpected motor failures, costly downtime, and unnecessary maintenance costs. Specifically, the guide summarizes technical data relative to four basic power plant motor types and associated components.

1992-05-02T23:59:59.000Z

118

Photovoltaic Operation and Maintenance Evaluation  

Science Conference Proceedings (OSTI)

Results from this study confirm that photovoltaic power plants require low operating and maintenance costs per kilowatthour. Projections based on these results suggest that in the future costs will fall below 0.5 cent per kilowatthour.

1990-01-11T23:59:59.000Z

119

Substation Reliability Centered Maintenance  

SciTech Connect

Substation Reliability Centered Maintenance (RCM) is a technique that is used to develop maintenance plans and criteria so the operational capability of substation equipment is achieved, restored, or maintained. The objective of the RCM process is to focus attention on system equipment in a manner that leads to the formulation of an optimal maintenance plan. The RCM concept originated in the airline industry in the 1970s and has been used since 1985 to establish maintenance requirements for nuclear power plants. The RCM process is initially applied during the design and development phase of equipment or systems on the premise that reliability is a design characteristic. It is then reapplied, as necessary, during the operational phase to sustain a more optimal maintenance program based on actual field experiences. The purpose of the RCM process is to develop a maintenance program that provides desired or specified levels of operational safety and reliability at the lowest possible overall cost. The objectives are to predict or detect and correct incipient failures before they occur or before they develop into major defects, reduce the probability of failure, detect hidden problems, and improve the cost-effectiveness of the maintenance program. RCM accomplishes two basic purposes: (1) It identifies in real-time incipient equipment problems, averting potentially expensive catastrophic failures by communicating potential problems to appropriate system operators and maintenance personnel. (2) It provides decision support by recommending, identifying, and scheduling preventive maintenance. Recommendations are based on maintenance criteria, maintenance history, experience with similar equipment, real-time field data, and resource constraints. Hardware and software are used to accomplish these two purposes. The RCM system includes instrumentation that monitors critical substation equipment as well as computer software that helps analyze equipment data.

Purucker, S.L.

1992-11-01T23:59:59.000Z

120

Low-cost silicon solar array project. First annual report, January 1975--March 1976  

DOE Green Energy (OSTI)

The Low-Cost Silicon Solar Array Project (LSSA) was established to greatly reduce the price of solar arrays by the improvement of manufacturing technology, by adaptation of mass production techniques, and by helping achievement of user acceptance. The Project's approach includes the development of technology, its transfer by industry to commercial practice, the evaluation of the economics involved, and the stimulation of market growth. The activities and progress of the LSSA Project during its first year are described in this document which covers all Project activities, with primary emphasis on the technical plans and accomplishments. The development of manufacturing technology is now and will continue to be performed principally by industries and universities. To date, 24 contractors are working on new silicon-refinement processes, silicon-sheet-growth techniques, encapsulants, and automated-assembly studies. Nine more contractors have been selected to perform additional technology investigations and their contracts are being negotiated. Additional contracts will be issued in the future as promising ideas appear. (WDM)

Not Available

1976-08-09T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections 2010--Volume 3: Balancing and A lignment  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2010-12-23T23:59:59.000Z

122

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections -- 2011: Volume 2, Repair Proce dures  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2012-07-31T23:59:59.000Z

123

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections—2007: Volumes 2 and 4 Sup plemental Additions  

Science Conference Proceedings (OSTI)

Up to 70 of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2008-03-27T23:59:59.000Z

124

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2006; Volume 1: General Practic es  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2007-03-30T23:59:59.000Z

125

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections 2010--Volume 4: Turbine Generat or Component Procurement Specifications  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2010-12-23T23:59:59.000Z

126

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2006; Volume 4: Turbine-Generat or Component Procurement Specifications  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2007-03-30T23:59:59.000Z

127

Management Applications of Maintenance Reports  

E-Print Network (OSTI)

The good computerized maintenance management systems available today provide Plant Engineers with sufficient data to institute policies and procedures to materially affect the company profits. Regrettably, the vast majority of these Engineers and their Maintenance Managers seem content to simply produce PM work orders, maintenance equipment repair histories and generate a few activity reports. A straightforward and practical application of the available cost and performance data enables maintenance management to constantly fine tune operational procedures to minimize cost and equipment failure from the available data. Using this data, the manager can easily measure the total effect of maintenance on his company's overall performance. The practical application of this data to reduce overall maintenance cost and to increase equipment availability is discussed in this paper.

Gehl, P.

1993-03-01T23:59:59.000Z

128

Real-time turbine maintenance system  

Science Conference Proceedings (OSTI)

Reliable power generation and low maintenance costs are the major goals of power plant administration. This goal, in fact, can be achieved by a proper turbine maintenance policy. This study presents a model for total productive maintenance to enhance ... Keywords: Radio frequency identification, Total productive maintenance, Turbine

Tung-Liang Chen

2009-05-01T23:59:59.000Z

129

Feasibility study to update annualized cost of leaving (ACOL) procedures at the Navy Personnel Research and Development Center (NPRDC)  

Science Conference Proceedings (OSTI)

Accurate forecasts of officer retention rates are required in order to shape correctly the size and internal structure of the Navy manpower force through accession, promotion, and related policies. This study, conducted in 1987 for the Navy Personnel Research and Development Center (NPRDC), reviews existing forecasting and simulation methodologies and suggests new methods to implement in the future in order to improve forecasts of naval officer retention rates. The study also considers alternative sources of data to capture civilian earnings opportunities in the models. Two major types of models -- Annualized Cost of Leaving (ACOL) and Dynamic Retention (DR) -- are discussed in detail with respect to the ability to model and evaluate manpower policies of interest to NPRDC staff. A variety of other techniques which should be considered during the estimation stage are also discussed. The general study approach involved researching the subject area, the current data, the current models, and current estimation procedures. Available data and methodologies were then compared with the NPRDC problem in order to recommend potential solutions. This study did not include data collection or data analysis. This report is organized in eight sections. The Background Section discusses the history of officer retention models, the scope of officer manpower analysis at NPRDC, and NPRDC's history of officer loss-rate forecasting. Section 3 discusses the approach to model selection, which includes addition to a thorough discussion of the Dynamic Retention Model (DRM) and a comparison of the DRM and ACOL model. Section 5 presents alternative modeling directions for forecasting and a summary of compensation policy issues. The summary and conclusions appear in Section 6, and recommendations are in Section 7. References are in Section 8.2. 30 refs., 1 tab. (JF)

Trumble, D.; Flanagan, D.M.

1990-12-01T23:59:59.000Z

130

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

131

Nuclear Maintenance Applications Center: Vertical Pump Maintenance Guide -- Update to EPRI Report 1003467  

Science Conference Proceedings (OSTI)

Results from several annual Electric Power Research Institute (EPRI) Nuclear Maintenance Applications Center (NMAC) maintenance issues surveys indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for information and assistance with pump and motor ...

2012-10-15T23:59:59.000Z

132

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Bicyclist rams vehicle denting hood. Damage not repaired. (not included in maintenance costs) ---- 10292002 9,594 Oil change 20.67 1242003 12,953 Oil change 20.67 623...

133

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Genevieve Saur (Primary Contact), Chris Ainscough. National Renewable Energy Laboratory (NREL) 15013 Denver West Parkway Golden, CO 80401-3305 Phone: (303) 275-3783 Email: genevieve.saur@nrel.gov DOE Manager HQ: Erika Sutherland Phone: (202) 586-3152 Email: Erika.Sutherland@ee.doe.gov Project Start Date: October 1, 2010 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Corroborate recent wind electrolysis cost studies using a * more detailed hour-by-hour analysis. Examine consequences of different system configuration * and operation for four scenarios, at 42 sites in five

134

Infrastructure Costs Associated with Central Hydrogen Production from Biomass and Coal - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Darlene Steward (Primary Contact), Billy Roberts, Karen Webster National Renewable Energy Laboratory (NREL) 15013 Denver West Parkway Golden, CO 80401-3305 Phone: (303) 275-3837 Email: Darlene.Steward@nrel.gov DOE Manager HQ: Fred Joseck Phone: (202) 586-7932 Email: Fred.Joseck@hq.doe.gov Project Start Date: Fiscal Year (FY) 2010 Project End Date: Project continuation and direction determined annually by DOE FY 2012 Objectives Elucidate the location-dependent variability of * infrastructure costs for biomass- and coal-based central hydrogen production and delivery and the tradeoffs inherent in plant-location choices Provide modeling output and correlations for use in other * integrated analyses and tools

135

Design of an Actinide Burning, Lead or Lead-Bismuth Cooled Reactor That Produces Low Cost Electricty - FY-02 Annual Report  

SciTech Connect

The purpose of this collaborative Idaho National Engineering and Environmental Laboratory (INEEL) and Massachusetts Institute of Technology (MIT) Laboratory Directed Research and Development (LDRD) project is to investigate the suitability of lead or lead-bismuth cooled fast reactors for producing low-cost electricity as well as for actinide burning. The goal is to identify and analyze the key technical issues in core neutronics, materials, thermal-hydraulics, fuels, and economics associated with the development of this reactor concept. Work has been accomplished in four major areas of research: core neutronic design, plant engineering, material compatibility studies, and coolant activation. The publications derived from work on this project (since project inception) are listed in Appendix A. This is the third in a series of Annual Reports for this project, the others are also listed in Appendix A as FY-00 and FY-01 Annual Reports.

Mac Donald, Philip Elsworth; Buongiorno, Jacopo

2002-10-01T23:59:59.000Z

136

Fundamental Laws and Assumptions of Software Maintenance Adam A. Porter  

E-Print Network (OSTI)

environments. The longer a system stays in service, the larger maintenance costs are, and, therefore, it­oriented programming languages, software architectures and configuration management. Managing the maintenance process. Maintenance is costly and somewhat unpredictable. Thus, management tools for controlling maintenance

Porter, Adam

137

A condition-based maintenance policy for intelligent monitored system  

Science Conference Proceedings (OSTI)

This study proposes a sequential Condition-Based Maintenance (CBM) policy for intelligent monitored system based on cost and reliability prioritisation. It is assumed that system's reliability could be continuously monitored, whenever ... Keywords: CBM, condition-based maintenance, cost, intelligent monitoring, maintenance policy, optimisation, predictive maintenance, reliability, simulation

Wenzhu Liao; Ershun Pan; Lifeng Xi

2009-06-01T23:59:59.000Z

138

DSOM (Decision Support for Operations and Maintenance ...  

Summary. Operations and maintenance (O&M) can make or break a business - especially with today's rising energy costs. DSOM® (Decision Support for ...

139

Nuclear Maintenance Applications Center: Compression Fitting Application Manual  

Science Conference Proceedings (OSTI)

The Nuclear Maintenance Applications Center: Compression Fitting Application Manual provides power plant maintenance personnel with current maintenance information on this type of component used in power plants, both fossil fuel and nuclear. This guide will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for this equipment.

2008-12-22T23:59:59.000Z

140

Burner Management System Maintenance Guide for Fossil Power Plant Personnel  

Science Conference Proceedings (OSTI)

Burner Management System Maintenance Guide for Fossil Power Plant Personnel provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs associated with the burner management system.

2008-03-25T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area  

Science Conference Proceedings (OSTI)

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist the plant maintenance personnel in improving the reliability and reducing the maintenance costs for this area of their scrubber system.

2009-12-08T23:59:59.000Z

142

Impact of DOE Program Goals on Hydrogen Vehicles: Market Prospect, Costs, and Benefits - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

9 9 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Zhenhong Lin (Primary Contact), David Greene, Jing Dong Oak Ridge National Laboratory (ORNL) National Transportation Research Center 2360 Cherahala Boulevard Knoxville, TN 37932 Phone: (865) 946-1308 Email: linz@ornl.gov DOE Manager HQ: Fred Joseck Phone: (202) 586-7932 Email: Fred.Joseck@hq.doe.gov Project Start Date: October 2011 Project End Date: September 2012 Fiscal Year (FY) 2012 Objectives Project market penetrations of hydrogen vehicles under * varied assumptions on processes of achieving the DOE program goals for fuel cells, hydrogen storage, batteries, motors, and hydrogen supply. Estimate social benefits and public costs under different *

143

Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation  

SciTech Connect

Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

Timothy Shaw; Anthony Baratta; Vaughn Whisker

2005-02-28T23:59:59.000Z

144

Mass-Production Cost Estimation for Automotive Fuel Cell Systems - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Brian D. James (Primary Contact), Kevin Baum, Andrew B. Spisak, Whitney G. Colella Strategic Analysis, Inc. 4075 Wilson Blvd. Suite 200 Arlington VA 22203 Phone: (703) 778-7114 Email: bjames@sainc.com DOE Managers HQ: Jason Marcinkoski, Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov GO: Gregory Kleen Phone: (720) 356-1672 Email: Gregory.Kleen@go.doe.gov Contract Number: DE-EE0005236 Project Start Date: September 30, 2011 Project End Date: September 30, 2016 Fiscal Year (FY) 2012 Objectives Update 2011 automotive fuel cell cost model to include * latest performance data and system design information. Examine costs of fuel cell systems (FCSs) for light-duty * vehicle and bus applications.

145

Development of a Low-Cost 3-10 kW Tubular SOFC Power System - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Norman Bessette Acumentrics Corporation 20 Southwest Park Westwood, MA 02090 Phone: (781) 461-8251; Email: nbessette@acumentrics.com DOE Managers HQ: Dimitrios Papageorgopoulos Phone: (202) 586-5463 Email: Dimitrios.Papageorgopoulos@ee.doe.gov GO: Reginald Tyler Phone: (720) 356-1805 Email: Reginald.Tyler@go.doe.gov Contract Number: DE-FC36-03NT41838 Project Start Date: April 1, 2008 Project End Date: March 31, 2013 Fiscal Year (FY) 2012 Objectives The goal of the project is to develop a low-cost 3-10 kW solid oxide fuel cell (SOFC) power generator capable of meeting multiple market applications. This is accomplished by: Improving cell power and stability * Cost reduction of cell manufacturing

146

Streamlined Reliability Centered Maintenance Analysis Application Update  

Science Conference Proceedings (OSTI)

A systematic evaluation of plant equipment and maintenance requirements using reliability centered maintenance (RCM) techniques can help hold down operating costs while maintaining plant availability and reliability. This report describes the application of streamlined reliability centered maintenance (streamlined RCM) methodology and software at four utilities.

2001-10-18T23:59:59.000Z

147

HTGR Cost Model Users' Manual  

Science Conference Proceedings (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

148

Phase 2 of the automated array assembly task of the Low-Cost Silicon Solar Array Project. Annual report  

DOE Green Energy (OSTI)

This report presents the results of investigations and analyses of an advanced process sequence for manufacturing high efficiency solar cells and modules in a cost-effective manner. The entire process sequence is presented and discussed step by step. Emphasis is on process simplicity and minimizing consumed materials. The process sequence incorporates texture etching, plasma processes for damage removal and patterning, ion implantation, low pressure silicon nitride deposition, and plated metal. A reliable module design is presented. Specific process step developments are presnted. Further, a detailed cost analysis has been performed to indicate future areas of fruitful cost reduction effort. Finally, recommendations for advanced investigations are presented.

Coleman, M.G.; Grenon, L.P.; Pastirik, E.M.; Pryor, R.A.; Sparks, T.G.

1978-11-01T23:59:59.000Z

149

Vehicle Investment and Operating Costs and Savings for Greenhouse Gas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vehicle Investment and Operating Costs and Savings for Greenhouse Vehicle Investment and Operating Costs and Savings for Greenhouse Gas Mitigation Strategies Vehicle Investment and Operating Costs and Savings for Greenhouse Gas Mitigation Strategies October 7, 2013 - 1:17pm Addthis YOU ARE HERE: Step 4 To help estimate costs of implementing greenhouse gas (GHG) mitigation strategies for vehicles, the table below provides the initial investment, operating costs, and operating savings for each strategy. Table 1. Types and Ranges of Initial Investment Requirements and Annual Operating Costs and Savings. Strategies Initial Investment Operating Costs Operating Savings Consolidate trips Time to research & coordinate routes None Eliminate fleet vehicle trips; reduce cost & time (fuel, maintenance, etc) associated with fleet vehicle use. Could result in decreasing inventory & need for vehicles leading to long-term savings

150

Ion Torren Semiconductor Sequencing Allows Rapid, Low Cost Sequencing of the Human Exome ( 7th Annual SFAF Meeting, 2012)  

Science Conference Proceedings (OSTI)

David Jenkins on "Ion Torrent semiconductor sequencing allows rapid, low-cost sequencing of the human exome" at the 2012 Sequencing, Finishing, Analysis in the Future Meeting held June 5-7, 2012 in Santa Fe, New Mexico.

Jenkins, David [EdgeBio

2012-06-01T23:59:59.000Z

151

An analysis of the costs of running a station car fleet  

SciTech Connect

Station cars are electric vehicles available at transit stations which may be used for transportation between the transit station and home, work, and/or for errands. This transportation service would be provided by the local transit agency. This report discusses an economic model of the costs of running a station car fleet. While some of these costs are highly uncertain, this analysis is a first look at the required user fees for full cost recovery. The model considers the capital costs of the vehicles and the required infrastructure; the annual fixed vehicle costs for insurance, registration, etc.; the mileage-based costs; and the annual non-vehicle costs for administration, infrastructure maintenance, etc. The model also includes various factors such as the fleet size, the annual mileage, the number of transit stations that would have facilities for station cars, and the number of users. The model specifically examines the cost of using of electric vehicles; however, for comparison, the cost of using a fleet of gasoline-powered vehicles also is calculated. This report examines the sensitivity of the model to the various factors. A principal conclusion from the analysis is that the largest cost contributor is the initial vehicle purchase price. For a given initial purchase price, the factor driving the user fee required for full cost recovery is the number of different daily users of a vehicle. The model also compares the annual cost of transportation using station cars and mass transit to the annual cost of solo commuting. If a station car is used by more than one person a day, and this use replaces the ownership of a conventional vehicle, the annual cost of transportation may be similar. However, for the base case assumptions, the station car user fee required for full cost recovery is higher than the cost of solo commuting.

Zurn, R.M.

1995-02-01T23:59:59.000Z

152

US nuclear power plant operating cost and experience summaries  

Science Conference Proceedings (OSTI)

NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

Kohn, W.E.; Reid, R.L.; White, V.S.

1998-02-01T23:59:59.000Z

153

PEM Electrolyzer Incorporating an Advanced Low-Cost Membrane - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Monjid Hamdan (Primary Contact), Tim Norman Giner, Inc. (Formerly Giner Electrochemical Systems, LLC.) 89 Rumford Ave. Newton, MA 02466 Phone: (781) 529-0526 Email: mhamdan@ginerinc.com DOE Managers HQ: Erika Sutherland Phone: (202) 586-3152 Email: Erika.Sutherland@ee.doe.gov GO: David Peterson Phone: (720) 356-1747 Email: David.Peterson@go.doe.gov Contract Number: DE-FG36-08GO18065 Subcontractors: * Virginia Polytechnic Institute and University, Blacksburg, VA * Parker Hannifin Ltd domnick hunter Division, Hemel Hempstead, United Kingdom Project Start Date: May 1, 2008

154

High Performance, Low Cost Hydrogen Generation from Renewable Energy - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Dr. Katherine Ayers (Primary Contact), Andy Roemer Proton Energy Systems d/b/a Proton OnSite 10 Technology Drive Wallingford, CT 06492 Phone: (203) 678-2190 Email: kayers@protononsite.com DOE Managers HQ: Erika Sutherland Phone: (202) 586-3152 Email: Erika.Sutherland@ee.doe.gov GO: Dave Peterson Phone: (720) 356-1747 Email: David.Peterson@go.doe.gov Contract Number: DE-EE000276 Subcontractors: * Entegris, Inc., Chaska, MN * The Electrochemical Engine Center at Penn State, University Park, PA * Oak Ridge National Laboratory, Oak Ridge, TN Project Start Date: September 1, 2009

155

Cost analysis methodology: Photovoltaic Manufacturing Technology Project. Annual subcontract report, 11 March 1991--11 November 1991  

DOE Green Energy (OSTI)

This report describes work done under Phase 1 of the Photovoltaic Manufacturing Technology (PVMaT) Project. PVMaT is a five-year project to support the translation of research and development in PV technology into the marketplace. PVMaT, conceived as a DOE/industry partnership, seeks to advanced PV manufacturing technologies, reduce PV module production costs, increase module performance, and expand US commercial production capacities. Under PVMaT, manufacturers will propose specific manufacturing process improvements that may contribute to the goals of the project, which is to lessen the cost, thus hastening entry into the larger scale, grid-connected applications. Phase 1 of the PVMaT project is to identify obstacles and problems associated with manufacturing processes. This report describes the cost analysis methodology required under Phase 1 that will allow subcontractors to be ranked and evaluated during Phase 2.

Whisnant, R.A. [Research Triangle Inst., Research Triangle Park, NC (United States)

1992-09-01T23:59:59.000Z

156

Effects of Technology Cost Parameters on Hydrogen Pathway Succession - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Mark F. Ruth* (Primary Contact), Victor Diakov*, Brian James † , Julie Perez ‡ , Andrew Spisak † *National Renewable Energy Laboratory 15013 Denver West Pkwy. Golden, CO 80401 Phone: (303) 817-6160 Email: Mark.Ruth@nrel.gov and Victor.Diakov@nrel.gov † Strategic Analysis, Inc. ‡ New West Technologies DOE Manager HQ: Fred Joseck Phone: (202) 586-7932 Email: Fred.Joseck@ee.doe.gov Subcontractor: Strategic Analysis, Inc., Arlington, VA Project Start Date: February 1, 2009 Project End Date: October 31, 2011 Fiscal Year (FY) 2012 Objectives Develop a macro-system model (MSM): * Aimed at performing rapid cross-cutting analysis - Utilizing and linking other models - Improving consistency between models -

157

High Speed, Low Cost Fabrication of Gas Diffusion Electrodes for Membrane Electrode Assemblies - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Emory S. De Castro BASF Fuel Cell, Inc. 39 Veronica Avenue Somerset, NJ 08873 Phone: (732) 545-5100 ext 4114 Email: Emory.DeCastro@BASF.com DOE Managers HQ: Nancy Garland Phone: (202) 586-5673 Email: Nancy.Garland@ee.doe.gov GO: Jesse Adams Phone: (720) 356-1421 Email: Jesse.Adams@go.doe.gov Contract Number: DE-EE0000384 Subcontractor: Dr. Vladimir Gurau Case Western Reserve University, Cleveland, Ohio Project Start Date: July 1, 2009 Project End Date: June 30, 2013 Fiscal Year (FY) 2012 Objectives Reduce cost in fabricating gas diffusion electrodes * through the introduction of high speed coating technology, with a focus on materials used for the high- temperature membrane electrode assemblies (MEAs)

158

Development of standardized, low-cost AC PV systems. Phase I annual report, 7 September 1995--7 November 1996  

DOE Green Energy (OSTI)

The objectives of this two-year program are to improve the reliability and safety and reduce the cost of installed grid-connected PV systems by creating standardized, pre-engineered components and an enhanced, low-cost, 250-Watt micro inverter. These advances will be combined with the new, large area Solarex MSX-240 PV module resulting in standard, modular AC PV {open_quotes}building blocks{close_quotes} used to create utility-interactive PV systems as small as one module to many thousands of modules to suit virtually any application. AC PV building blocks will be developed to meet the requirements of the U.S., Japanese and European markets.

Strong, S.J.; Wohlgemuth, J.H.; Kaelin, M.

1997-06-01T23:59:59.000Z

159

Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area provides fossil plant maintenance personnel with current maintenance information on this system and will help to improve the reliability of and reduce the maintenance costs for this area of their scrubber system.

2008-12-18T23:59:59.000Z

160

Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area provides the fossil plant maintenance personnel with current maintenance information on this system and will help improve the reliability and reduce the maintenance costs for this area of their scrubber system.

2008-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

162

PVMaT Cost Reductions in the EFG High-Volume PV Manufacturing Line: Annual Report, August 1998-December 2000  

DOE Green Energy (OSTI)

The PVMaT 5A2 program at ASE Americas is a three-year program that addresses topics in the development of manufacturing systems, low-cost processing approaches, and flexible manufacturing methods. The three-year objectives are as follows: (1) implementation of computer-aided manufacturing systems, including Statistical Process Control, to aid in electrical and mechanical yield improvements of 10%, (2) development and implementation of ISO 9000 and ISO 14000, (3) deployment of wafer production from large-diameter (up to 1 m) EFG cylinders and wafer thicknesses down to 95 microns, (4) development of low-damage, high-yield laser-cutting methods for thin wafers, (5) cell designs for >15% cell efficiencies on 100-micron-thick EFG wafers, (6) development of Rapid Thermal Anneal processing for thin high-efficiency EFG cells, and (7) deployment of flexible manufacturing methods for diversification in wafer size and module design. In the second year of this program, the significant accomplishments in each of three tasks that cover these areas are as follows: Task 4-Manufacturing systems, Task 5-Low-cost processes, and Task 6-Flexible manufacturing.

Bathey, B.; Brown, B.; Cao, J.; Ebers, S.; Gonsiorawski, R.; Heath, B.; Kalejs, J., Mackintosh, B.; Ouellette, M.; Piwczyk, B., Rosenblum, M.; Southimath, B. (ASE Americas, Inc.)

2001-02-22T23:59:59.000Z

163

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

Science Conference Proceedings (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

164

Estimation of Highway Maintenance Marginal Cost under Multiple Maintenance Activities  

E-Print Network (OSTI)

funded by 5th Framework RTD Programme. ITS, University of1.1, Funded by 5th Framework RTD Programme. ITS, University

Anani, Shadi B.; Madanat, Samer M

2010-01-01T23:59:59.000Z

165

Reduce Oil Dependence Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Reduce Oil Dependence Costs U.S. Petroleum Use, 1970-2010 Nearly 40% of the oil we use is imported, costing us roughly 300 billion annually. Increased domestic oil production from...

166

Development of cost-effective surfactant flooding technology. First annual report for the period, September 30, 1992--September 29, 1993  

Science Conference Proceedings (OSTI)

This research consists of the parallel development of a new chemical flooding simulator and the application of existing UTCHEM simulation code to model surfactant flooding. The new code is based upon a completely new numerical method that combines for the first time higher order finite difference methods, flux limiters, and implicit algorithms. Early results indicate that this approach has significant advantages in some problems and will likely enable simulation of much larger and more realistic chemical floods once it is fully developed. Additional improvements have also been made to the UTCHEM code and it has been applied for the first time to the study of stochastic reservoirs with and without horizontal wells to evaluate methods to reduce the cost and risk of surfactant flooding. During the first year of this contract, significant progress has been made on both of these tasks. The authors have found that there are indeed significant differences between the performance predictions based upon the traditional layered reservoir description and the more realistic and flexible descriptions using geostatistics. These preliminary studies of surfactant flooding using horizontal wells shows that although they have significant potential to greatly reduce project life and thus improve the economics of the process, their use requires accurate reservoir descriptions and simulations to be effective. Much more needs to be done to fully understand and optimize their use and develop reliable design criteria.

Pope, G.A.; Sepehrnoori, K.

1994-08-01T23:59:59.000Z

167

FACILITIES MAINTENANCE & UPKEEP The Lawrence campus is operating three different custodial and maintenance groups on campus resulting in  

E-Print Network (OSTI)

facilities management system, and provide the adequate tools and training necessary. · Implementing contemporary zone maintenance will reduce management and layers, enabling costFACILITIES MAINTENANCE & UPKEEP Context · The Lawrence campus is operating three

Peterson, Blake R.

168

Building Energy Software Tools Directory: Maintenance Edge  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

169

Sound maintenance practices protect fan investments  

Science Conference Proceedings (OSTI)

Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

Bauer, M.

2009-11-15T23:59:59.000Z

170

Pulverizer Maintenance Guide  

Science Conference Proceedings (OSTI)

The Pulverizer Maintenance Guide, Volume 3: Ball/Tube Mills provides fossil plant personnel with current maintenance information on ball/tube mills from different manufacturers. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2006-03-31T23:59:59.000Z

171

Roadway Improvement Project Cost Allocation  

E-Print Network (OSTI)

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

172

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

173

Low Cost Titanium Powder Development for Additive Manufacturing ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Cost Affordable Titanium IV. Presentation Title, Low Cost Titanium Powder ...

174

Microsoft Word - maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

175

Cylinder Surveillance and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance and Maintenance Cylinder Surveillance and Maintenance DOE has a Cylinder Management program in place to inspect and maintain depleted UF6 cylinders, and to improve...

176

Flue Gas Desulfurization Scrubber Maintenance Guide: Wastewater Treatment and Gypsum Handling Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Wastewater Treatment and Gypsum Handling Area provides fossil plant maintenance personnel with current maintenance information on these systems. This guide will assist plant maintenance personnel in improving the reliability and reducing the maintenance costs for these areas of their scrubber system.

2009-12-23T23:59:59.000Z

177

EIA - Annual Energy Outlook Retrospective Review  

U.S. Energy Information Administration (EIA)

Energy intensity (Energy consumption/real $ GDP) About the Annual Energy Outlook. Contact Information and Staff; ... Updated capital cost for ...

178

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network (OSTI)

Compressor, components and distribution FM FM FMD 17 STEAM Distribution to building systems FM FM C 18 STEAM Distribution to department equipment FM FMD FMD 19 VACUUM DISTRIBUTION Department SERVICE CONNECTION FM C C 13 PRIMARY ELECTRICAL SERVICE CONNECTIONS FM C C 14 STEAM UTILITY

Gulliver, Robert

179

The Annualized Social Cost of Motor-Vehicle Use in the U.S., 1990-1991: Summary of Theory, Data, Methods, and Results  

E-Print Network (OSTI)

specific transportation projects, the social-cost analysisold analyses of the social costs of transportation in the U.the Full Social Costs and Benefits of Transportation, ed. by

Delucchi, Mark A.

1997-01-01T23:59:59.000Z

180

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES  

E-Print Network (OSTI)

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES DONALD H. GRAHAM Operations. The discussion will focus on the management, operation, and maintenance systems nec essary to support long maintenance management pro gram (j) cost accounting and a record keeping system to provide timely, accurate

Columbia University

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network (OSTI)

the satisfaction of customers and profits. From a global perspective of lifecycle management, the role of (e)-maintenance maintenance actions. This idleness can be due to failures of some other elements in the system. More generally. But opportunistic maintenance can help save set-up costs and guarantee the expected performances for the system

Paris-Sud XI, Université de

182

Reducing Home Heating and Cooling Costs  

U.S. Energy Information Administration (EIA) Indexed Site

. . . . . . . . . . . . 19 B1. Annual Cost of Oil Heat in Various Climates for a Range of Heating Oil Prices and System Efficiencies . . . . . 21 B2. Annual Cost of Gas Heat in...

183

Facilities Maintenance Guide  

Science Conference Proceedings (OSTI)

The subject of facilities maintenance is very broad and is commonly interpreted quite differently among maintenance managers at power plants and U.S. Department of Energy (DOE) nuclear and process facilities. In many cases, the maintenance of administrative buildings, support structures, and "real property" is managed separately from the maintenance of process equipment. The scope and breadth of each maintenance program varies from site to site, as does the formality of the program established to address...

2004-09-16T23:59:59.000Z

184

Cost and Reliability Improvement for CIGS-Based PV on Flexible Substrate: Annual Technical Report, 24 May 2006 - 25 September 2007  

DOE Green Energy (OSTI)

Global Solar Energy has enhanced module reliability, reduced cost and improved performance of its CIGS deposition process, and reduced cost of materials and processes for contacts.

Weideman, S.

2008-08-01T23:59:59.000Z

185

Annual Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Occupational Radiation Exposure Occupational Radiation Exposure Home Welcome What's New Register Dose History Request Data File Submittal REMS Data Selection HSS Logo Annual Reports User Survey on the Annual Report Please take the time to complete a survey on the Annual Report. Your input is important to us! The 2012 Annual Report View or print the annual report in PDF format The 2011 Annual Report View or print the annual report in PDF format The 2010 Annual Report View or print the annual report in PDF format The 2009 Annual Report View or print the annual report in PDF format The 2008 Annual Report View or print the annual report in PDF format The 2007 Annual Report View or print the annual report in PDF format The 2006 Annual Report View or print the annual report in PDF format The 2005 Annual Report

186

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network (OSTI)

New maintenance techniques for circuit breakers are studied in this dissertation by proposing a probabilistic maintenance model and a new methodology to assess circuit breaker condition utilizing its control circuit data. A risk-based decision approach is proposed at system level making use of the proposed new methodology, for optimizing the maintenance schedules and allocation of resources. This dissertation is focused on developing optimal maintenance strategies for circuit breakers, both at component and system level. A probabilistic maintenance model is proposed using similar approach recently introduced for power transformers. Probabilistic models give better insight into the interplay among monitoring techniques, failure modes and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost and failure cost. This maintenance model is best suited for long-term maintenance planning. All simulations are carried in MATLAB and how the analysis results may be used to achieve optimal maintenance schedules is discussed. A new methodology is proposed to convert data from the control circuit of a breaker into condition of the breaker by defining several performance indices for breaker assemblies. Control circuit signal timings are extracted and a probability distribution is fitted to each timing parameter. Performance indices for various assemblies such as, trip coil, close coil, auxiliary contacts etc. are defined based on the probability distributions. These indices are updated using Bayesian approach as the new data arrives. This process can be made practical by approximating the Bayesian approach calculating the indices on-line. The quantification of maintenance is achieved by computing the indices after a maintenance action and comparing with those of previously estimated ones. A risk-based decision approach to maintenance planning is proposed based on the new methodology developed for maintenance quantification. A list of events is identified for the test system under consideration, and event probability, event consequence, and hence the risk associated with each event is computed. Optimal maintenance decisions are taken based on the computed risk levels for each event. Two case studies are presented to evaluate the performance of the proposed new methodology for maintenance quantification. The risk-based decision approach is tested on IEEE Reliability Test System. All simulations are carried in MATLAB and the discussions of results are provided.

Natti, Satish

2008-12-01T23:59:59.000Z

187

Guidelines on the Effects of Cycling Operation on Maintenance Activities  

Science Conference Proceedings (OSTI)

Cyclic operation can result in an increase in forced outage rates, higher operation and maintenance (O&M) costs, and further wear and tear on components due to additional overhauls and maintenance. Such operation may also increase unforeseen costs due to additional personnel training requirements and the use of more sophisticated evaluation and inspection techniques. These guidelines are intended to help plant operators and engineers assess the impact of cycling on maintenance activities and take appropr...

2001-12-10T23:59:59.000Z

188

The Annualized Social Cost of Motor-Vehicle Use in the U.S., 1990-1991: Summary of Theory, Data, Methods, and Results  

E-Print Network (OSTI)

the Use of Persian-Gulf Oil for Motor Vehicles (M. Delucchirunoff polluted by oil from motor vehicles, and pollutionuse of Persian-Gulf oil by motor vehicles B, D Annualized

Delucchi, Mark A.

1997-01-01T23:59:59.000Z

189

IEA Wind Task 26 - Multi-national Case Study of the Financial Cost of Wind Energy; Work Package 1 Final Report  

DOE Green Energy (OSTI)

The lifetime cost of wind energy is comprised of a number of components including the investment cost, operation and maintenance costs, financing costs, and annual energy production. Accurate representation of these cost streams is critical in estimating a wind plant's cost of energy. Some of these cost streams will vary over the life of a given project. From the outset of project development, investors in wind energy have relatively certain knowledge of the plant's lifetime cost of wind energy. This is because a wind energy project's installed costs and mean wind speed are known early on, and wind generation generally has low variable operation and maintenance costs, zero fuel cost, and no carbon emissions cost. Despite these inherent characteristics, there are wide variations in the cost of wind energy internationally, which is the focus of this report. Using a multinational case-study approach, this work seeks to understand the sources of wind energy cost differences among seven countries under International Energy Agency (IEA) Wind Task 26 - Cost of Wind Energy. The participating countries in this study include Denmark, Germany, the Netherlands, Spain, Sweden, Switzerland, and the United States. Due to data availability, onshore wind energy is the primary focus of this study, though a small sample of reported offshore cost data is also included.

Schwabe, P.; Lensink, S.; Hand, M.

2011-03-01T23:59:59.000Z

190

A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys  

E-Print Network (OSTI)

Std Dev Cost Per Annual Cost Per kWh Usage Peak kW AverageStd Dev Cost Per Annual Cost Per kWh Usage Peak kW Average3-2. Logged Outage Cost per Annual kWh Figure 3-3. Logged

Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

2003-01-01T23:59:59.000Z

191

Feedwater Heater Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of feedwater heaters. The contents of this guide will assist plant personnel in improving feedwater heater reliability, performance, and maintenance practices.

2002-05-29T23:59:59.000Z

192

Improve Operations & Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

193

Maintenance and Veg Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Functions Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands...

194

The Annualized Social Cost of Motor-Vehicle Use in the U.S., 1990-1991: Summary of Theory, Data, Methods, and Results  

E-Print Network (OSTI)

to count all price-times-quantity oil revenues as the cost,cost simply as the quantity of crude oil embodied in highwaythe actual price-times-quantity payment for oil. That is, in

Delucchi, Mark A.

1997-01-01T23:59:59.000Z

195

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

196

Sootblowing Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information concerning good maintenance practices, condition monitoring, predictive and preventive techniques, probable failure modes, and troubleshooting guidance to personnel involved in the maintenance of sootblowing systems and their components. This guide was developed to provide basic information as well as detailed maintenance and troubleshooting information.

2001-12-20T23:59:59.000Z

197

Performance Focused Maintenance for Distribution Substations  

Science Conference Proceedings (OSTI)

Performance Focused Maintenance (PFM) was introduced in 2005 as a generic concept to help maintenance managers cope with the competing objectives of maintaining service standards while containing costs. This report further develops the principles of PFM and integrates them into the larger power delivery asset management process. As the name implies, PFM focuses on performance and this report develops and demonstrates the steps required to establish proper performance measures and KPIs for PFM implementat...

2006-12-19T23:59:59.000Z

198

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

199

Cost Study Manual  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2012 28, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a percent of payroll exceeds the comparator group by more than five percent. For example, if per capita benefit costs for the comparator group are $10,000 and the benefit costs as a percent of payroll for the comparator group are 20%, the threshold for the contractor's benefits as a

200

U.S. Nuclear Power Plant Operating Cost and Experience Summaries  

Science Conference Proceedings (OSTI)

The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports.

Reid, RL

2003-09-18T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Unit 16: Maintenance & Evolution To introduce the challenge of maintaining a  

E-Print Network (OSTI)

to deal with change ¥ Software maintenance - the general process of changing a system once it has been + 0.3IM)/100 #12;9 Techniques & tools for maintenance ¥ Key techniques Ð Configuration management Configuration management repositories When to stop maintenance? ¥ Is the cost of maintenance too high

Finkelstein, Anthony

202

Predictive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

203

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

204

Costs of Saving Water in South Texas with Irrigation District Infrastructure Rehabilitation - Using Capital Budgeting with RGIDECON©  

E-Print Network (OSTI)

As a part of the irrigation district plans, economists with Texas AgriLife Research and the Texas AgriLife Extension Service (through the Rio Grande Basin Initiative), developed and applied a spreadsheet model RGIDECON© (Rio Grande Irrigation District Economics) to facilitate unbiased comparisons of real project costs. That is, a Capital Budgeting – Net Present Value (NPV) methodology, combined with calculation of annuity equivalent (AE) values, was developed to incorporate different initial construction costs, annual operation and maintenance costs, quantity of water saved, expected useful life, etc. of the various alternative projects. Using this combined approach allows for calculation of a single, annual $/acre-foot (af) {or $/1,000 gal} life-cycle cost, comprehensive of all relevant financial and economic parameters, thereby facilitating comparisons across and priority ranking among ID projects.

Rister, E.; Lacewell, R.; Sturdivant, A.

2013-03-01T23:59:59.000Z

205

Maintenance and Insurance Options for Managing Technical Risks in Combustion Turbine Projects  

Science Conference Proceedings (OSTI)

Costs for combustion turbine maintenance typically represent over half of the total non-fuel operation and maintenance (O&M) costs for combined-cycle power plants. Technical risks in component durability and integrity expose owners/operators to higher costs for maintaining units in operating condition. Potentially catastrophic events have occurred that have required significant maintenance expenditures to cover costs of component repair and replacement. This report looks at aspects of insurance and long-...

2010-12-02T23:59:59.000Z

206

Accelerating PV Cost Effectiveness Through Systems Design, Engineering, and Quality Assurance: Phase I Annual Technical Report, 4 November 2004 - 3 November 2005  

DOE Green Energy (OSTI)

During Phase I of this PV Manufacturing R&D subcontract, PowerLight Corporation has made significant progress toward the reduction of installed costs for commercial-scale, rooftop PV systems. PowerLight has worked to reduce operating costs by improving long-term reliability and performance through the development of more sophisticated tools used in system design and monitoring. Additionally, PowerLight has implemented design improvements with the goal of reducing cost while maintaining and/or improving product quality. As part of this effort, PowerLight also modified manufacturing and shipping processes to accommodate these design changes, streamline material flow, reduce cost, and decrease waste streams. During Phase II of this project, PowerLight plans to continue this work with the goal of reducing system cost and improving system performance.

Botkin, J.

2006-07-01T23:59:59.000Z

207

Status of fusion maintenance  

SciTech Connect

Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission.

Fuller, G.M.

1984-01-01T23:59:59.000Z

208

RM Maintenance Services  

NLE Websites -- All DOE Office Websites (Extended Search)

maintenance forces are responsible for over 118 substations and almost 5300 miles of transmission lines. The Rocky Mountain Region recently updated its Metering Policy. Its...

209

Data Base Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Database Maintenance Keys Page anyone in Site Operations Building Management (see Personnel) with your room number. If you are locked out during off-hours, contact Security on...

210

Sensitivity Analysis of H2-Vehicles' Market Prospects, Costs and Benefits - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program David L. Greene (Primary Contact), Zhenhong Lin, Jing Dong Oak Ridge National Laboratory National Transportation Research Center 2360 Cherahala Boulevard Knoxville, TN 37932 Phone: (865) 946-1310 Email: dlgreene@ornl.gov DOE Manager HQ: Fred Joseck Phone: (202) 586-7932 Email: Fred.Joseck@hq.doe.gov Subcontractor: Department of Industrial Engineering, University of Tennessee, Knoxville, TN Project Start Date: October, 2010 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Project market shares of hydrogen fuel cell vehicles * (FCVs) under varying market conditions using the Market Acceptance of Advanced Automotive Technologies (MA3T) model.

211

Preliminary benefit-cost analysis of the Fast Flux Test Facility (FFTF) power addition  

SciTech Connect

The primary objective of this report is to conduct a preliminary benefit-cost study for the proposed power addition to FFTF to determine whether the project is cost-effective. If the project is authorized, construction will begin in 1986 and end in 1991. Full power operation is scheduled to begin in 1991 and a project life of 20 years is assumed. The undiscounted cost during the construction period of the FFTF power addition is estimated to be approximately $117 million over the construction period (1984 dollars). An additional $3 million is estimated as the opportunity cost - or value of these resources in their most favorable alternative use - of surplus FFTF equipment and unused CRBR equipment, including materials for steam generator fabrication. The annual operating and maintenance cost of the project is estimated to be about $2.1 million in 1984 dollars. 20 references.

Callaway, J.M.; Lezberg, A.J.; Scott, M.J.; Tawil, J.J.

1984-07-01T23:59:59.000Z

212

Maintenance implementation plan for fuel supply shutdown  

Science Conference Proceedings (OSTI)

This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ``MAINTENANCE MANAGEMENT PROGRAM``, that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan.

Stephenson, R.L.

1995-06-01T23:59:59.000Z

213

Finished Prokaryotic Genome Assemblies from a Low-cost Combination of Short and Long Reads (Seventh Annual Sequencing, Finishing, Analysis in the Future (SFAF) Meeting 2012)  

Science Conference Proceedings (OSTI)

Shuangye Yin on "Finished prokaryotic genome assemblies from a low-cost combination of short and long reads" at the 2012 Sequencing, Finishing, Analysis in the Future Meeting held June 5-7, 2012 in Santa Fe, New Mexico.

Yin, Shuangye (Broad Institute)

2012-06-01T23:59:59.000Z

214

Reliability Centered Maintenance (RCM) Technical Reference for Power Delivery  

Science Conference Proceedings (OSTI)

This technical reference expands on the original reliability centered maintenance (RCM) research performed by EPRI in the late 1990s. It incorporates nearly ten years of utility RCM experience in power delivery and emphasizes the requirements of managing and measuring maintenance programs. RCM's overall goal is to improve the economic posture of a utility by promoting cost-effective application of maintenance resources. This "Technical Reference for Power Delivery" serves as the "handbook" of RCM for the...

2003-12-10T23:59:59.000Z

215

Streamlined Reliability-Centered Maintenance (SRCM) Implementation Guidelines, Volume 3  

Science Conference Proceedings (OSTI)

Following EPRI's philosophy to use and expand existing technology if it makes economic sense, EPRI's Plant Maintenance Optimization (PMO) Target has adopted a reliability-centered maintenance (RCM) process called SRCM. SRCM provides a utility a cost-effective process to determine the optimum maintenance strategy for plant systems and equipment based on importance to business objectives. SRCM maintains all the basic steps of traditional RCM.

1999-12-03T23:59:59.000Z

216

Cost reduction and manufacture of the SunSine{reg_sign} AC module: Phase I Annual Report : 21 April 1998 -- 31 October 1999  

DOE Green Energy (OSTI)

This report summarizes the progress made by Ascension Technology in Phase 1 of the cost reduction and manufacturing improvements of the SunSine{reg_sign} AC Module. This work, conducted under NREL subcontract, is a two-phase effort consisting of investigations into improving inverter packaging, soft switching, circuit optimization, design for manufacturing, manufacturing processes, and pilot production manufacturing. The objective of this subcontract is to significantly reduce the cost of the SunSine{reg_sign} inverter, enhance its performance, and streamline and expand the manufacturing process. During Phase 1, the soft-switching topology was designed, then refined to meet stringent cost and performance goals. This design resulted in improved performance, smaller overall footprint, and reduced costs. The aluminum inverter housing was redesigned, and the decision was made to conformal coat the circuit boards, which was verified through the HAST (Highly Accelerated Stress Testing) method. Potential international markets were identified, and the inverter is designed to be easily modified to meet the requirements of other countries. Significant cost reduction and performance improvements have been achieved in Phase I, and accomplishments during Phase I include: (1) SunSine{reg_sign} AC Module costs have been reduced enough to be able to reduce the suggested list price; (2) successful implementation of soft-switching; (3) power circuit-board size reduced 53{percent}; (4) power circuit-board component count reduced 34{percent}; (5) total inverter parts count reduced 49{percent}; (6) anticipated inverter manufacturing cost reduced 57{percent} on a $/Wp rating; (7) transformer efficiency improved 1.4{percent}; and (8) inverter efficiency improved 4.7{percent} to 91.0{percent} at 275 Wac.

Kern, E.; Kern, G.

2000-03-06T23:59:59.000Z

217

Solar Water Heating System Maintenance and Repair | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Heating System Maintenance and Repair Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement. You should also take steps to prevent scaling, corrosion, and freezing. You might be able to handle some of the inspections and maintenance tasks on your own, but others may require a qualified technician. Ask for a cost estimate in writing before having any work done. For some systems, it may

218

Synergistically Enhanced Materials and Design Parameters for Reducing the Cost of Hydrogen Storage Tanks - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Kevin L. Simmons (Primary Contact), Kenneth Johnson, and Kyle Alvine Pacific Northwest National Laboratory (PNNL) 902 Battelle Blvd Richland, WA 99352 Phone: (509) 375-3651 Email: Kevin.Simmons@pnnl.gov Norman Newhouse (Lincoln Composites, Inc.), Mike Veenstra (Ford Motor Company), Anand V. Rau (TORAY Carbon Fibers America) and Thomas Steinhausler (AOC, L.L.C.) DOE Managers HQ: Ned Stetson Phone: (202) 586-9995 Email: Ned.Stetson@ee.doe.gov GO: Jesse Adams

219

Development of Low-Cost, High Strength Commercial Textile Precursor (PAN-MA) - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report C.D. Warren and Felix L. Paulauskas Oak Ridge National Laboratory 1 Bethel Valley Road Oak Ridge, TN 37831 Phone: (865) 574-9693 Email: warrencd@ornl.gov Email: paulauskasfl@ornl.gov DOE Manager HQ: Ned Stetson Phone: (202) 586-9995 Email: Ned.Stetson@ee.doe.gov Contributors: * Hippolyte Grappe (ORNL) * Fue Xiong (ORNL) * Ana Paula Vidigal (FISIPE) * Jose Contrerias (FISIPE) Project Start Date: April 21, 2011 Project End Date: July 31, 2013 Fiscal Year (FY) 2012 Objectives Down-select from 11 polymer candidate polymer *

220

New MEA Materials for Improved Direct Methanol Fuel Cell (DMFC) Performance, Durability, and Cost - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report James Fletcher (Primary Contact), Philip Cox University of North Florida (UNF) 1 UNF Drive Jacksonville, FL 32224 Phone: (904) 620-1844 Email: jfletche@UNF.edu DOE Managers HQ: Donna Ho Phone: (202) 586-8000 Email: Donna.Ho@ee.doe.gov GO: Katie Randolph Phone: (720) 356-1759 Email: Katie.Randolph@go.doe.gov Contract Number: DE-EE0000475 Subcontractors: * University of Florida, Gainesville, FL * Northeastern University, Boston, MA * Johnson Matthey Fuel Cells, Swindon, UK

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

Timely and proper execution of operation and maintenance (O&M) activities may be a key factor in ensuring the successful function of selective catalytic reduction (SCR) systems. This report serves as the 2012 update of EPRI’s Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New and revised content this year includes: 1) recent developments in in situ NOx analyzers, including a ...

2012-12-05T23:59:59.000Z

222

Reliability Centered Maintenance (RCM) Technical Reference for Power Delivery  

Science Conference Proceedings (OSTI)

The overall goal of Reliability Centered Maintenance (RCM) is to improve the economic posture of a utility by promoting cost-effective application of maintenance resources. EPRI's RCM Technical Reference for Power Delivery provides utilities with essential technical data and guidance for conducting RCM studies of power delivery equipment and systems. It serves as the "handbook" of RCM for the utility power delivery sector.

1997-11-04T23:59:59.000Z

223

Maintenance and Application Guide for Control Relays and Timers  

Science Conference Proceedings (OSTI)

Reliable performance of control and timing relays is vital to the efficient operation of nuclear plants. This guide provides utilities practical, cost-effective methods for a control relay and timer maintenance program. It can help utilities optimize test and maintenance intervals while limiting expenditures.

1993-10-02T23:59:59.000Z

224

Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) Version 2  

Science Conference Proceedings (OSTI)

The Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) spreadsheet provides combustion turbine operators with a low-cost, easy-to-install, easy-to-use program for monitoring combustion turbine (CT) axial compressor performance. Utilities can use it to diagnose the condition of axial compressors and to determine the benefits of maintenance actions such as an off-line compressor wash.

2000-11-29T23:59:59.000Z

225

TMS 2013: Annual Meeting & Exhibition - Students  

Science Conference Proceedings (OSTI)

(A detailed cost breakdown is included below.) ... My participation in the TMS 2013 Annual Meeting & Exhibition is a wise investment of time and energy that will ...

226

Fuel performance annual report for 1991. Volume 9  

Science Conference Proceedings (OSTI)

This report is the fourteenth in a series that provides a compilation of information regarding commercial nuclear fuel performance. The series of annual reports were developed as a result of interest expressed by the public, advising bodies, and the US Nuclear Regulatory Commission (NRC) for public availability of information pertaining to commercial nuclear fuel performance. During 1991, the nuclear industry`s focus regarding fuel continued to be on extending burnup while maintaining fuel rod reliability. Utilities realize that high-burnup fuel reduces the amount of generated spent fuel, reduces fuel costs, reduces operational and maintenance costs, and improves plant capacity factors by extending operating cycles. Brief summaries of fuel operating experience, fuel design changes, fuel surveillance programs, high-burnup experience, problem areas, and items of general significance are provided.

Painter, C.L.; Alvis, J.M.; Beyer, C.E. [Pacific Northwest Lab., Richland, WA (United States); Marion, A.L. [Oregon State Univ., Corvallis, OR (United States). Dept. of Nuclear Engineering; Payne, G.A. [Northwest Coll. and Univ. Association for Science, Richland, WA (United States); Kendrick, E.D. [Nuclear Regulatory Commission, Washington, DC (United States)

1994-08-01T23:59:59.000Z

227

Pennsylvania life cycle costing manual  

SciTech Connect

Until the 1970s, it was commonplace for institutions and governments to purchase equipment based on lowest initial (first) costs. Recurring costs such as operational, maintenance, and energy costs often were not considered in the purchase decision. If an agency wanted to buy something, it published specifications and requested bids from several manufacturers. Often, the lowest bidder who met the specifications won the job, with no consideration given to the economic life of the equipment or yearly recurring costs such as energy and maintenance costs. The practice of purchasing based on lowest initial costs probably did not make good economic sense prior to 1970, and it certainly does not make good sense now. The wise person will consider all costs and benefits associated with a purchase, both initial and post-purchase, in order to make procurement decisions that are valid for the life of the equipment. This describes a method of financial analysis that considers all pertinent costs: life cycle costing (LCC).

1996-02-01T23:59:59.000Z

228

Method and computer program product for maintenance and modernization backlogging  

DOE Patents (OSTI)

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

2013-02-19T23:59:59.000Z

229

REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REQUIREMENTS BASED SURVEILLANCE AND REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM General Information: A. Evaluator:_______________________ Organization:___________________ Ph:_________________ B. Interviewee:_____________________ Organization:____________________ Ph:_________________ C. Activity Name :_____________________________________________________ General/Administrative Support Mission/Facility Support (Circle One) D. Safety Related: _____Yes _____No E. Procedure #: _______________________________________________________ F. Charge Number: _____________________________________________________ G. Frequency for Conducting the Activity: (Circle One) Hourly Shiftly Daily Weekly Bi-weekly Monthly Quarterly Semi-Annually Annually

230

Phase I of the automated array assembly task of the low cost silicon solar array project. Annual technical report. Motorola report No. 2258/4  

DOE Green Energy (OSTI)

Work performed to analyze, both technically and economically, the state of technology readiness for the automated production of solar cells and modules is compiled and reviewed critically. The long-term objective solar module characteristics include a selling price of less than $.50/peak watt and a mean-time-before-failure (MTBF) of 20 years in any terrestrial environment. While efficiency is important to attaining the cost goal, it is a most significant factor in array economics; accordingly, this program has stressed high efficiency, with a suggested cell goal of 15 percent. The analysis emphasized technical evaluation of individual process steps first, and then concentrated upon process sequences for making solar cells and modules. Further analysis was performed to yield a detailed cost study of individual process steps; this was applied to the cost analysis of potential process sequences. Potentially economical process sequences formed from process steps deemed to have high technical merit were then identified. Potentially promising technologies needing further development to achieve satisfactory maturity were then identified. It is concluded that, while specific areas of technology need advanced development and the source of silicon needs definition, no fundamentally new technology needs to be developed to permit manufacture of solar cells which will meet the 1985 LSSA Program cost goals.

Coleman, M.G.; Pryor, R.A.; Grenon, L.A.; Lesk, I.A.

1977-02-01T23:59:59.000Z

231

The Annualized Social Cost of Motor-Vehicle Use in the U.S., 1990-1991: Summary of Theory, Data, Methods, and Results  

E-Print Network (OSTI)

of gasoline excludes retail sales taxes and the motor-fuelmotor gasoline, and add to it the refineriesÕ actual private cost (exclusive of taxes)motor vehicles, and certainly not to forward any particular position about what, for example, gasoline taxes

Delucchi, Mark A.

1997-01-01T23:59:59.000Z

232

Photovoltaic Manufacturing Cost and Throughput Improvements for Thin-Film CIGS-Based Modules; Phase II Annual Subcontract Technical Report, July 1999 - August 2000  

DOE Green Energy (OSTI)

Thin-film photovoltaics (PV) has expanded dramatically in the last five years, but commercial use remains limited by performance, cost, and reliability. Of all the thin-film systems, copper indium gallium diselenide (CIGS) has demonstrated the greatest potential for achieving high performance at a low cost. The highest-quality CIGS has been formed by multi-source co-evaporation, a technique pioneered in this country by researchers at NREL. Multi-source co-evaporation is also potentially the fastest and most cost-effective method of CIGS absorber deposition. Global Solar Energy (GSE) has adapted multi-source co-evaporation of CIGS to large-area, roll-to-roll processing on flexible substrates, enabling several manufacturing and product capability advantages. Roll-to-roll processing enables a low-cost, automated continuous manufacturing process. Flexible substrates enable product application in unique, as well as traditional, areas. The primary objectives of the GSE Photovoltaic Manufacturing Technology (PVMaT) subcontract are to reduce cost and expand the production rate of thin-film CIGS-based PV modules on flexible substrates. Improvements will be implemented in monolithic integration, CIGS deposition, contact deposition, and in-situ CIGS control and monitoring. Specific goals of the three-year contract are: - Monolithic Integration - Increase integration speed by developing high-speed, all-laser scribing processes that are more than 100% faster than the baseline process and offer clean, selective scribing; increase capacity and substantially reduce module area losses by insulating materials with high accuracy into laser scribes. - Absorber Deposition - Increase absorber-layer deposition rate by 75% in the large-area, continuous GSE process, increasing throughput and reducing labor and capital costs. Integrate a parallel detector spectroscopic ellipsometer (PDSE) with mathematical algorithms for in-situ control of the CIGS absorber, enabling runs of over 300 meters of moving substrate, while ensuring uniform properties; enhance health and safety by reducing selenium waste generation through modifications to the reactor and Se delivery method. - Back Contact Deposition - Reduce back-contact cost and increase operation yield by using improved back-contact materials.

Wendt, T.G.; Wiedeman, S. (Global Solar Energy, L.L.C.)

2001-03-12T23:59:59.000Z

233

Maintenance | OpenEI Community  

Open Energy Info (EERE)

Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

234

The Market Value and Cost of Solar Photovoltaic Electricity Production  

E-Print Network (OSTI)

energy generation from wind, geothermal, biomass, and central station solar thermal, with a 5% annual increase in the real cost

Borenstein, Severin

2008-01-01T23:59:59.000Z

235

Centrifugal and Positive Displacement Charging Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

In pressurized water reactors, charging pumps provide charging flow to the RCS and are also required to be available in the event of a loss of coolant accident (LOCA) event. Pump availability combined with modes of operation have made pump maintenance both frequent and costly. This report provides techniques to assist utilities in reducing maintenance costs for these pumps. Areas for improving reliability of these pumps include: excessive seal leakage, definition of acceptable seal leakage, packing life,...

1996-12-31T23:59:59.000Z

236

Process-Based Cost Modeling to Support Target Value Design  

E-Print Network (OSTI)

in Designing to Target Cost. ” 12th Annual Conference of thethe Hurdle of First Cost: Action Research in TargetD.T. (1987). “A Future for Cost Modelling: Building Cost

Nguyen, Hung Viet

2010-01-01T23:59:59.000Z

237

Very Low Cost Manufacturing of Titanium Alloy Components  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2010 TMS Annual Meeting & Exhibition. Symposium , Cost-Affordable Titanium III. Presentation Title, Very Low Cost Manufacturing ...

238

Estimating Costs and Efficiency of Storage, Demand, and Heat...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

more efficient system. When considering a water heater model for your home, estimate its energy efficiency and annual operating cost. Then, compare costs with other more andor...

239

Treatment Resin Reduces Costs, Materials in Hanford Groundwater...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Treatment Resin Reduces Costs, Materials in Hanford Groundwater Cleanup - Efficiency delivered more than 6 million in cost savings, 3 million in annual savings Treatment Resin...

240

Manufacturing of Low-Cost, Durable Membrane Electrode Assemblies Engineered for Rapid Conditioning - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program F. Colin Busby W.L. Gore & Associates, Inc (Gore) Gore Electrochemical Technologies Team 201 Airport Road Elkton, MD 21921 Phone: (410) 392-3200 Email: CBusby@WLGore.com DOE Managers HQ: Nancy Garland Phone: (202) 586-5673 Email: Nancy.Garland@ee.doe.gov GO: Jesse Adams Phone: (720) 356-1421 Email: Jesse.Adams@go.doe.gov Contract Number: DE-FСЗ6-08G018052 Subcontractors: * UTC Power, South Windsor, CT * University of Delaware, Newark, DE (UD) * University of Tennessee, Knoxville, TN (UTK) Project Start Date: October 1, 2008 Project End Date: June 30, 2014

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Development of Advanced Manufacturing Technologies for Low Cost Hydrogen Storage Vessels - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Mark Leavitt Quantum Fuel Systems Technologies Worldwide, Inc. 25242 Arctic Ocean Drive Lake Forest, CA 92630 Phone: (949) 399-4584 Email: mleavitt@qtww.com DOE Managers HQ: Nancy Garland Phone: (202) 586-5673 Email: Nancy.Garland@ee.doe.gov GO: Jesse Adams Phone: (720) 356-1421 Email: Jesse.Adams@go.doe.gov Contract Number: DE-FG36-08GO18055 Subcontractors: * Boeing Research and Technology, Seattle, WA * Pacific Northwest National Laboratory (PNNL), Richland, WA Project Start Date: September 1, 2008 Project End Date: March 31, 2013 Fiscal Year (FY) 2012 Objectives Develop new methods for manufacturing Type IV

242

Low-Cost Large-Scale PEM Electrolysis for Renewable Energy Storage - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Dr. Katherine Ayers (Primary Contact), Chris Capuano Proton Energy Systems d/b/a Proton OnSite 10 Technology Drive Wallingford, CT 06492 Phone: (203) 678-2190 Email: kayers@protononsite.com DOE Manager HQ: Erika Sutherland Phone: (202) 586-3152 Email: Erika.Sutherland@ee.doe.gov Contract Number: DE-SC0001338 Subcontractors: * 3M, Minneapolis, MN * University of Wyoming, Laramie, WY Project Start Date: June 19, 2010 (Phase 1) Project End Date: August 18, 2013 (with Phase 2 continuation) Fiscal Year (FY) 2012 Project Objectives Demonstrate optimal membrane electrode assembly * (MEA) efficiency through: Refinement of catalyst compositions based on -

243

Contiguous Platinum Monolayer Oxygen Reduction Electrocatalysts on High-Stability Low-Cost Supports - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Radoslav Adzic (Primary Contact), Miomir Vukmirovic, Kotaro Sasaki, Jia Wang, Yang Shao-Horn 1 , Rachel O'Malley 2 Brookhaven National Laboratory (BNL), Bldg. 555 Upton, NY 11973-5000 Phone: (631) 344-4522 Email: adzic@bnl.gov DOE Manager HQ: Nancy Garland Phone: (202) 586-5673 Email: Nancy.Garland@ee.doe.gov Subcontractors: 1 Massachusetts Institute of Technology (MIT), Cambridge MA 2 Johnson Matthey Fuel Cells (JMFC), London, England Project Start Date: July 1, 2009 Project End Date: September 30, 2013 Fiscal Year (FY) 2012 Objectives Developing high-performance fuel cell electrocatalysts for the oxygen reduction reaction (ORR) comprising contiguous Pt monolayer (ML) on stable, inexpensive metal

244

Cost, Energy Use, and Emissions of Tri-Generation Systems - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Mark F. Ruth* (Primary Contact), Michael E. Goldsby † , Timothy J. Sa † , Victor Diakov* *National Renewable Energy Laboratory 15013 Denver West Pkwy. Golden, CO 80401 Phone: (303) 817-6160 Email: Mark.Ruth@nrel.gov † Sandia National Laboratories DOE Manager HQ: Fred Joseck Phone: (202) 586-7932 Email: Fred.Joseck@ee.doe.gov Project Start Date: December 1, 2010 Project End Date: October 31, 2011 Fiscal Year (FY) 2012 Objectives Develop a macro-system model (MSM): * Aimed at performing rapid cross-cutting analysis - Utilizing and linking other models - Improving consistency between models - Incorporate tri-generation systems into the MSM and * develop a methodology for MSM users to analyze

245

Critical Research for Cost-Effective Photoelectrochemical Production of Hydrogen - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Liwei Xu (Primary Contact) 1 , Anke E. Abken 2 , William B. Ingler 3 , John Turner 4 1 Midwest Optoelectronics LLC (MWOE) 2801 W. Bancroft Street Mail Stop 230 Toledo, OH 43606 Phone: (419) 215-8583 Email: xu@mwoe.com 2 Xunlight Corporation (Xunlight) 3 University of Toledo, Toledo, OH (UT) 4 National Renewable Energy Laboratory, Golden, CO (NREL) DOE Managers HQ: Eric Miller Phone: (202) 287-5829 Email: Eric.Miller@ee.doe.gov GO: David Peterson Phone: (720) 356-1747 Email: David.Peterson@go.doe.gov Contract Number: DE-FG36-05GO15028 Subcontractors: * Xunlight Corporation, Toledo, OH * University of Toledo, Toledo, OH * National Renewable Energy Laboratory, Golden, CO

246

New High Performance Water Vapor Membranes to Improve Fuel Cell Balance of Plant Efficiency and Lower Costs (SBIR Phase I) - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Earl H. Wagener (Primary Contact), Brad P. Morgan, Jeffrey R. DiMaio Tetramer Technologies L.L.C. 657 S. Mechanic St. Pendleton, SC 29670 Phone: (864) 646-6282 Email: earl.wagener@tetramertechnologies.com DOE Manager HQ: Nancy Garland Phone: (202) 586-5673 Email: Nancy.Garland@ee.doe.gov Contract Number: DE-SC0006172 Project Start Date: June 17, 2011 Project End Date: March 16, 2012 Fiscal Year (FY) 2012 Objectives Demonstrate water vapor transport membrane with * >18,000 gas permeation units (GPU) Water vapor membrane with less than 20% loss in * performance after stress tests Crossover leak rate: <150 GPU * Temperature Durability of 90°C with excursions to * 100°C Cost of <$10/m

247

Static Seals Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides comprehensive technical information on the understanding and maintenance of static seals. It is designed to help utility staffs maintain static seals and minimize and trouble shoot leakage problems that can reduce plant availability.

1994-09-22T23:59:59.000Z

248

Wind Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

This guideline provides component-level information regarding the maintenance of major components associated with a wind turbine. It combines recommendations offered by major equipment manufacturers with lessons learned from owner/operators of wind turbine facilities.

2012-06-29T23:59:59.000Z

249

Life Cycle cost Analysis of Waste Heat Operated Absorption Cooling Systems for Building HVAC Applications  

E-Print Network (OSTI)

In this paper, life cycle cost analysis (LCCA) of waste heat operated vapour absorption air conditioning system (VARS) incorporated in a building cogeneration system is presented and discussed. The life cycle cost analysis (LCCA) based on present worth cost (PWC) method, which covers the initial costs, operating costs, maintenance costs, replacement costs and salvage values is the useful tool to merit various cooling and power generation systems for building applications. A life cycle of 23 years was used to calculate the PWC of the system for annual operating hours of 8760 and the same is compared with the electric based vapour compression chiller (VCRS) of same capacity. The life cycle cost (LCC) of waste heat operated absorption chiller is estimated to be US $ 1.5 million which is about 71.5 % low compared to electric powered conventional vapour compression chiller. From the analysis it was found that the initial cost of VARS system was 125 % higher than that of VCRS, while the PWC of operating cost of VARS was 78.2 % lower compared to VCRS. The result shows that the waste heat operated VARS would be preferable from the view point of operating cost and green house gas emission reduction.

Saravanan, R.; Murugavel, V.

2010-01-01T23:59:59.000Z

250

Labor costs may be reduced . . . Research yields size-controlling rootstocks for peach production  

E-Print Network (OSTI)

Doyle David Ramming Production costs in peaches are highlyby UC and USDA. production costs could be substantiallyDRAFT T he annual production costs for peaches grown in

DeJong, Theodore M.; Johnson, R. Scott; Doyle, James F.; Ramming, David

2005-01-01T23:59:59.000Z

251

Nuclear Maintenance Applications Center: Feed Pump Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Steam Turbines and Auxiliaries Program 65 and the Nuclear Maintenance Application Center have developed a series of maintenance guides to assist plant personnel with the performance of various maintenance tasks associated with a wide variety of plant components. The objective of this project was to publish a maintenance guide for the feed pump turbines that included an ...

2012-09-25T23:59:59.000Z

252

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Why O&M? 2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate substantial energy savings and should be considered a resource. Moreover, improvements to facility maintenance programs can often be accomplished immediately and at a relatively low cost. 2.2 Definitions Operations and Maintenance are the decisions and actions regarding the control and upkeep of

253

Innovative Approaches to Low Cost Module Manufacturing of String Ribbon Si PV Modules: Phase II, Annual Technical Progress Report, 1 April 2003--31 May 2004  

DOE Green Energy (OSTI)

This subcontract resulted in a number of important advances for Evergreen Solar Inc. Foremost amongst these is the production implementation of dual ribbon growth from a single crucible (Gemini) using the String Ribbon continuous ribbon technology. This project has resulted in the flattest ribbon and the highest yields and machine uptime ever seen at Evergreen Solar. This then has resulted in significantly lowered consumables costs and lower overall direct manufacturing costs. In addition, methods to control the as-grown surface of Gemini ribbon have permitted the usage of the so-called no-etch process that allows for direct transfer of as-grown ribbon to diffusion without any intermediate etching step. In-line diagnostics for Gemini were further developed--these included more accurate methods for measuring and controlling melt depth and more accurate means to measure and control ribbon thickness. Earlier in the project, the focus was on monolithic module development. With the Gemini advances described above, monolithic module work was brought to a close during this second year of the overall three year project. A significant advance in this technology was the development of a conductive adhesive in combination with Evergreen's proprietary backskin and encapsulant. 25-W size experimental monolithic modules have been tested and found to be able to withstand up to 1400 thermal cycles.

Hanoka, J. I.

2004-10-01T23:59:59.000Z

254

C:\\ANNUAL\\Vol2chps.v8\\ANNUAL2.VP  

Annual Energy Outlook 2012 (EIA)

9 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 State Residential Commercial Industrial Vehicle Fuel Consumption (thousand cubic feet) Cost...

255

Minthorn Springs Creek Summer Juvenile Release and Adult Collection Facility; Operation, Maintenance and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1989 Annual Report.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding and spawning adult steelhead and acclimation and release of juvenile salmon and steelhead. Regularly-scheduled maintenance was completed in 1989. Equipment and pumps received maintenance and repair. An automatic dialing system was incorporated into the alarm system at the Minthorn facility. A security company has replaced the function of the Umatilla Tribal Police which was to contact fisheries personnel in case of an alarm. The configuration of the alarm system was upgraded to activate the alarm faster and provide better access to project personnel with a pager system. A survey was completed in 1988 by Thomas Bumstead of Albrook Hydraulics Lab in Pullman, WA. to determine potential measures to address the change in course of the Umatilla River around Minthorn as a result of the flood of 1986. Options and recommendations were submitted in a report in 1989. Fish Management Consultants Inc. submitted the final reports of evaluations for both the Bonifer and Minthorn facilities. A total of 150 adult steelhead were collected for broodstock at Threemile Dam from December through March and held at Minthorn. Forty-two pairs were spawned (37 pairs from Minthorn and 5 pairs collected and immediately spawned at Threemile Dam). The 241,682 eggs were transferred to Irrigon Hatchery for incubation and later moved to Oak Springs Hatchery for rearing. An estimated 368 adult hatchery steelhead returned to the Umatilla River in 1988-89 (based on Threemile Dam trap counts and harvest below Threemile Dam) these, and 349 were released upriver. Of seven returned to the Bonifer trap where the smolts were initially released. Acclimation of 79,984 spring chinook salmon and 22,274 steelhead was completed at Bonifer in spring of 1989. At Minthorn, 157,299 coho salmon and 29,852 summer steelhead were acclimated and released. Acclimation of 78,825 fall chinook salmon at Minthorn and 80,750 spring chinook salmon completed in the fall. at Bonifer was successfully Control groups were released instream concurrent with the acclimated releases to evaluate the effects of acclimation on adult returns to the Umatilla River. Test and control groups were tagged by ODFW for acclimation studies to be performed at the Bonifer and Minthorn facilities in 1989 and 1990. Each group received three separate coded-wire tag codes. One experiment for fall chinook salmon, two experiments for spring chinook salmon (spring and fall releases) and one experiment for summer steelhead were tagged. The progress of outmigration for acclimated releases was monitored at the juvenile salmonid trap located at Westland Diversion. Because the fish in each release were not uniquely fish size and migration timing were used to discern general trends. Data suggested that juvenile salmonids started showing up at the trap 4 days after release until July 14, when sampling was discontinued. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids to test summer steelhead broodstock from the Umatilla River for monitoring purposes and to certify eggs as pathogen-free.

Lofy, Peter T.; Rowan, Gerald D.

1990-03-01T23:59:59.000Z

256

Nuclear Maintenance Applications Center: Guideline for Cooling Tower Inspection and Maintenance  

Science Conference Proceedings (OSTI)

Cooling tower structural failures have recently become a focus area for the nuclear industry based on events that have resulted in lost generation as well as high repair costs. Environmental concerns regarding thermal pollution and water usage have also recently increased the need for guidance for cooling tower inspection and maintenance.

2011-06-06T23:59:59.000Z

257

Recursive operation time maximization model for the maintenance of power generation equipment  

Science Conference Proceedings (OSTI)

Repairable equipment requires preventive maintenance (PM) to maintain proper function. An appropriate PM strategy can extend the life of equipment and reduce variable costs. A power generation company in Taiwan that has a fixed-period PM strategy is ... Keywords: Maintenance improvement factor, Mathematical programming, Preventive maintenance (PM)

Der-Chiang Li; Chiao-Wen Liu; Tung-Liang Chen

2012-05-01T23:59:59.000Z

258

Circuit Breaker Maintenance: Volume 2: Medium Voltage Circuit Breakers; Part 3: Westinghouse Types DH and DHP  

Science Conference Proceedings (OSTI)

This comprehensive guide will help utilities enhance and optimize maintenance of Westinghouse DH and DHP circuit breakers. It consolidates industry guidelines, applicable standards, original equipment manufacturer recommendations, and hands-on experience relative to these breakers. Optimized maintenance will increase reliability and reduce costs associated with corrective maintenance and equipment downtime.

1994-02-02T23:59:59.000Z

259

Petroleum marketing annual 1994  

SciTech Connect

The Petroleum Marketing Annual (PMA) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysis, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the fob and landed cost of imported crude oil, and the refiners` acquisition cost of crude oil. Refined petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data in the Petroleum Marketing Annual. For this production, all estimates have been recalculated since their earlier publication in the Petroleum Marketing Monthly (PMM). These calculations made use of additional data and corrections that were received after the PMM publication date.

NONE

1995-08-24T23:59:59.000Z

260

Design of an Actinide Burning, Lead or Lead-Bismuth Cooled Reactor that Produces Low Cost Electricity FY-01 Annual Report, October 2001  

SciTech Connect

The purpose of this collaborative Idaho National Engineering and Environmental Laboratory (INEEL) and Massachusetts Institute of Technology (MIT) Laboratory Directed Research and Development (LDRD) project is to investigate the suitability of lead or lead-bismuth cooled fast reactors for producing low-cost electricity as well as for actinide burning. The goal is to identify and analyze the key technical issues in core neutronics, materials, thermal-hydraulics, fuels, and economics associated with the development of this reactor concept. Work has been accomplished in four major areas of research: core neutronic design, plant engineering, material compatibility studies, and coolant activation. The publications derived from work on this project (since project inception) are listed in Appendix A.

Mac Donald, Philip Elsworth; Buongiorno, Jacopo; Davis, Cliff Bybee; Herring, James Stephen; Loewen, Eric Paul; Smolik, Galen Richard; Weaver, Kevan Dean; Todreas, N.

2001-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Maintenance simulation: Software issues  

SciTech Connect

The maintenance of a distributed software system in a production environment involves: (1) maintaining software integrity, (2) maintaining and database integrity, (3) adding new features, and (4) adding new systems. These issues will be discussed in general: what they are and how they are handled. This paper will present our experience with a distributed resource management system that accounts for resources consumed, in real-time, on a network of heterogenous computers. The simulated environments to maintain this system will be presented relate to the four maintenance areas.

Luk, C.H.; Jette, M.A.

1995-07-01T23:59:59.000Z

262

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

263

CH Packaging Maintenance Manual  

SciTech Connect

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

264

Lawn Maintenance Safety  

E-Print Network (OSTI)

Most homeowners do not consider lawn maintenance to be dangerous. However lawn mowers, trimmers, edgers and other power equipment can cause minor to severe burns and lacerations, broken and dislocated bones, eye injuries and loss of fingers, toes and legs. You can avoid accidents like these by following the safety guidelines in this publication.

Smith, David

2005-07-12T23:59:59.000Z

265

Preventive Maintenance Programs  

Science Conference Proceedings (OSTI)

...and specifications Operator, service, and repair manuals Lubricant type Filter specifications Wear components, especially material survey data Prior service and maintenance reports to identify problem Establish sampling and sample handling procedures Design and document sampling methods, such as in-live...

266

Web Recency Maintenance Protocol  

Science Conference Proceedings (OSTI)

In this paper, we propose a new protocol namely Web Recency Maintenance Protocol (WRMP) that employs "push" mechanism to maintain the currency of the World Wide Web (WWW) at Search Engine (SE) site. As of this writing SEs are adopting "pull" technology, ...

K. Satya Sai Prakash; S. V. Raghavan

2002-12-01T23:59:59.000Z

267

2007 Annual Peer Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2007 Annual Peer Review 2007 Annual Peer Review September 27, 2007 San Francisco, California Welcoming Remarks Imre Gyuk US Dept. of Energy DOE / ESS Program Overview (View .pdf) John Boyes Sandia National Laboratories PRESENTATIONS\ ECONOMICS - BENEFIT STUDIES Evaluating Value Propositions for Four Modular Electricity Storage Demonstrations in California (View .pdf) Jim Eyer (Distributed Utility Assoc.) Update on Benefit and Cost Comparison of Modular Energy Storage Technologies for Four Viable Value Propositions (View .pdf) Susan Schoenung (Longitude 122 West, Inc.) ECONOMICS - ENVIRONMENT BENEFITS STUDIES Emissions from Traditional & Flywheel Plants for Regulation Services (View .pdf) Rick Fioravanti (KEMA, Inc.) UTILITY & COMMERCIAL APPLICATIONS OF ADVANCED ENERGY STORAGE SYSTEMS

268

Job Maintenance and Capital Development Fund (North Carolina) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance and Capital Development Fund (North Carolina) Maintenance and Capital Development Fund (North Carolina) Job Maintenance and Capital Development Fund (North Carolina) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Carolina Program Type Grant Program Provider Department of Commerce The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of significant numbers of high-paying, high-quality job and large-scale capital investments. Grants may be made for a term of up to ten years. The business must have at least 2000 employees and invest $200 million in capital improvements

269

Microsoft Word - S08568_CY2011 Annual Rpt  

Office of Legacy Management (LM)

through other means such as Web-based tools and public meetings. U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2011...

270

Microsoft Word - S07121_CY2010 Annual Rpt  

Office of Legacy Management (LM)

Site Calendar Year 2010 April 2011 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2010...

271

Maintenance Work Management -- Best Practices Guidelines: Maintenance Assessment and Improvement  

Science Conference Proceedings (OSTI)

This report on maintenance work management best practices is part of EPRI's Plant Maintenance Optimization (PMO) development efforts. Based on a series of assessment and improvement projects, the report describes the process and typical results.

1998-03-12T23:59:59.000Z

272

Nuclear Maintenance Applications Center: Heat Exchanger Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of heat exchangers. The contents of this guide will assist plant personnel in improving heat exchanger reliability, performance, and maintenance practices.

2009-06-14T23:59:59.000Z

273

MOTOR-VEHICLE INFRASTRUCTURE AND SERVICES PROVIDED BY THE PUBLIC SECTOR Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

based on the cost estimates for private parking, in Report #and institutional parking The cost estimates for 1991 area complete social-cost estimate would include, in addition,

Delucchi, Mark

2005-01-01T23:59:59.000Z

274

Motor-Vehicle Infrastructure and Services Provided by the Public Sector: Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

based on the cost estimates for private parking, in Report #and institutional parking The cost estimates for 1991 area complete social-cost estimate would include, in addition,

Delucchi, Mark; Murphy, James

2005-01-01T23:59:59.000Z

275

Computerized Maintenance Management System and Maintenance Work Process Integration  

Science Conference Proceedings (OSTI)

A Computerized Maintenance Management System (CMMS) is an information and communication tool supporting the maintenance work process within an industrial plant. Though these types of systems are found in various industries, no report has existed describing CMMS integration within a utility environment. This guideline describes how to integrate a CMMS with the methods, procedures, work processes, and overall maintenance in a power plant.

1998-04-29T23:59:59.000Z

276

care and maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

277

HVAC Maintenance and Technologies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

278

Terminal automation system maintenance  

SciTech Connect

Nothing has improved petroleum product loading in recent years more than terminal automation systems. The presence of terminal automation systems (TAS) at loading racks has increased operational efficiency and safety and enhanced their accounting and management capabilities. However, like all finite systems, they occasionally malfunction or fail. Proper servicing and maintenance can minimize this. And in the unlikely event a TAS breakdown does occur, prompt and effective troubleshooting can reduce its impact on terminal productivity. To accommodate around-the-clock loading at racks, increasingly unattended by terminal personnel, TAS maintenance, servicing and troubleshooting has become increasingly demanding. It has also become increasingly important. After 15 years of trial and error at petroleum and petrochemical storage and transfer terminals, a number of successful troubleshooting programs have been developed. These include 24-hour {open_quotes}help hotlines,{close_quotes} internal (terminal company) and external (supplier) support staff, and {open_quotes}layered{close_quotes} support. These programs are described.

Coffelt, D.; Hewitt, J. [Engineered Systems Inc., Tempe, AZ (United States)

1997-01-01T23:59:59.000Z

279

Petroleum Marketing Annual 2009  

Gasoline and Diesel Fuel Update (EIA)

Petroleum Marketing Annual 2009 Petroleum Marketing Annual 2009 Released: August 6, 2010 Monthly price and volume statistics on crude oil and petroleum products at a national, regional and state level. Notice: Changes to EIA Petroleum Data Program Petroleum Marketing Annual --- Full report in PDF (1.2 MB) Previous Issues --- Previous reports are available on the historical page. Summary Statistics Summary Statistics Tables PDF 1 Crude Oil Prices PDF TXT 1A Refiner Acquisition Cost of Crude Oil by PAD Districts HTML PDF TXT 2 U.S. Refiner Prices of Petroleum Products to End Users HTML PDF TXT 3 U.S. Refiner Volumes of Petroleum Products to End Users PDF TXT Motor Gasoline to End Users HTML Residual Fuel Oil and No. 4 Fuel to End Users HTML Other Petroleum Products to End Users HTML

280

Main Generator Rotor Maintenance  

Science Conference Proceedings (OSTI)

Main generator rotors are constructed and designed to provide decades of reliable and trouble-free operation. However, a number of incidences have occurred over the years that can adversely impact reliable operation of generator rotors and, ultimately, production of electrical power. This report is a guide for power plant personnel responsible for reliable operation and maintenance of main generators. As a guide, this report provides knowledge and experience from generator experts working at power plants...

2006-11-27T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Reactive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

282

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network (OSTI)

to refine the system details, interfaces and the requirements for remote handling. Table 1. FIRE RadialInsulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM objectives and subsystem requirements in an arrangement that allows remote maintenance of in

283

Preventive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

284

MOTOR-VEHICLE INFRASTRUCTURE AND SERVICES PROVIDED BY THE PUBLIC SECTOR Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

OIL - HOLDING COSTS .AND MANAGEMENT, AND OIL-HOLDING COSTS 7.12.1 Background TheO & M costs, and oil–holding costs -- can be estimated from

Delucchi, Mark

2005-01-01T23:59:59.000Z

285

U. S. Military Expenditures to Protect the Use of Persian Gulf Oil for Motor Vehicles: Report #15 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

the cost of crude oil and the cost of the products is notare related to the amount and cost of oil imported from theDivision, The External Costs of Oil Used in Transportation,

Delucchi, Mark; Murphy, James

2006-01-01T23:59:59.000Z

286

Motor-Vehicle Infrastructure and Services Provided by the Public Sector: Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

OIL - HOLDING COSTS .AND MANAGEMENT, AND OIL-HOLDING COSTS 7.12.1 Background TheO & M costs, and oil–holding costs -- can be estimated from

Delucchi, Mark; Murphy, James

2005-01-01T23:59:59.000Z

287

Operations and Maintenance Program Measurement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement October 4, 2013 - 5:19pm Addthis Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a successful O&M program. O&M managers must think beyond reliability. Successful programs incorporate reliability along with controlling costs, evaluating and implementing new technologies, tracking and reporting health and safety issues, and more. Not only are these metrics useful in assessing effectiveness, but also in equipment cost justification, program modifications, and staff hiring. Common Metrics The following metrics are common in evaluating effective O&M programs. Not

288

Requirements-Based Surveillance and Maintenance Review Guide | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to provide organizations with the knowledge and tools necessary to perform a disciplined and thorough Requirements-Based Surveillance and Maintenance (RBSM) review at any given facility or site in order to cost effectively manage S&M activities. Sections 1.0, 2.0 and 3.0 of this manual provide a brief explanation of what the RBSM review process is, why such a process is needed and the steps a facility or site should take to get organized and initiate an RBSM review. Sections 4.0 and 5.0 of this manual discuss the use of the data gained from the RBSM review process like the development of cost reduction strategies and the development of

289

Transmission Structure Design Features to Facilitate Construction and Maintenance  

Science Conference Proceedings (OSTI)

The power industry wants to construct reliable and cost-effective overhead lines. A reliable and cost-effective line requires not only that the line and structures meet design criteria for strength, clearances, and electrical considerations, but also that it can be constructed and maintained easily and safely. Design and construction practices should therefore go hand in hand. A minor change in design could have a large impact on construction and maintenance costs. The various departments within a ...

2013-11-18T23:59:59.000Z

290

Do-It-Now building maintenance reengineering project  

Science Conference Proceedings (OSTI)

The Do-It-Now (DIN) building maintenance system is proposed to reduce the cost of routine building maintenance and repairs and to improve customer satisfaction with maintenance services. DIN uses a team approach to periodically inspect buildings and provide maintenance services on the spot. It emphasizes communications between the customers and the craftspeople performing the work. The system was designed using a reengineering approach that characterized the existing maintenance work control system, analyzed comparable systems in other DOE laboratories, envisioned an ideal system, and proposed a workable, testable system for initial implementation. At each stage, input was solicited from customer representatives and Facilities management to ensure meeting customer requirements with an implementable system.

Apoddaca, L.; Ayotte, A.; Coffman, J.; Dukes, L.; Jojola, S.; Kadlec, J.; Letourneau, S.; Matthews, R.; Paul, G.

1996-09-01T23:59:59.000Z

291

Bottom Ash System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the bottom ash system and its components, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed primarily to provide detailed maintenance and troubleshooting information but also includes basic system information.

2000-10-31T23:59:59.000Z

292

Predictive Maintenance Program Implementation Experience  

Science Conference Proceedings (OSTI)

Predictive maintenance (PDM) is a process of collecting data, assessing machinery condition, and deciding when to perform maintenance. PDM saves money and improves machinery reliability as compared to preventive or corrective maintenance. This report describes the implementation of PDM programs at Commonwealth Edison's (ComEd's) fossil power plants.

1998-12-29T23:59:59.000Z

293

EIA - Updated Capital Cost Estimates for Electricity Generation Plants  

U.S. Energy Information Administration (EIA)

Almost all of these factors can vary by region, as do capacity factors for renewable generation, operations and maintenance costs associated with individual ...

294

Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants  

DOE Green Energy (OSTI)

This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

1999-06-01T23:59:59.000Z

295

Design of a maintenance and operations recommender  

E-Print Network (OSTI)

from computerized maintenance management systems (CMMS)use computerized maintenance management systems (CMMS) andmanagement and control systems (EMCS) to recom- mend what maintenance

Federspiel, C.; Villafana, L.

2003-01-01T23:59:59.000Z

296

HVAC Maintenance and Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Maintenance and Technologies HVAC Maintenance and Technologies Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility...

297

Utilities are doing too much breaker maintenance  

Science Conference Proceedings (OSTI)

Many breaker failures occur after the breaker has been torn down for maintenance because some error was made in reassembling it. Utilities now can get a better understanding of circuit breaker reliability as the result of a worldwide survey conducted by the International Conference on Large High-Voltage Electric Systems (Cigre) of the reliability of circuit breakers 63 kV and above. The most significant finding is that the rate of major failures have dropped drastically with the introduction of modern SF[sub 6] breakers (from 1.58 to 0.67 per 100 breaker-years). But the rate of minor failures - such as gas leaks, which require maintenance and add to the operating cost - has increased by 30%. Incorrect maintenance causes far fewer failures in modern breakers, simply because they have to be torn down less frequently. Only 15% as many major failures and 77% as many minor failures can be attributed to incorrect maintenance. The failure to open or close on command are still the dominant major-failure modes of circuit breakers. 4 tabs.

Heising, C. (Reliability Consultant, Wynnewood, PA (United States))

1994-12-01T23:59:59.000Z

298

Effective Steam Trap Selection/Maintenance - Its Payback  

E-Print Network (OSTI)

In oil refineries and petrochemical plants large number of steam traps are used to discharge condensate from steam mains, tracers and process equipment. Early efforts on steam traps focused almost exclusively on their selection and sizing, and it was not until the 1973 oil embargo that a need for regular maintenance became recognized. Although relatively small pieces of equipment, traps are responsible for large quantities of steam losses, decreased equipment efficiency and high maintenance costs; e.g., a steam trap leaking 100 psig steam through a 1/8 inch orifice costs at least $2k/yr if steam is valued at $5/k lb. Typically, a steam trap survey identifies 20-60% of traps malfunctioning. Therefore, establishing an effective steam trap selection/maintenance program is not simple but can be extremely profitable. This paper will show how a successful checking/maintenance program can result in high returns by using a case study at an Exxon plant. The example also shows how a central engineering organization can interact with plant technicians/ maintenance personnel to help implement an effective steam trap maintenance program at competitive costs and high returns.

Garcia, E.

1984-01-01T23:59:59.000Z

299

Examining the effectiveness of municipal solid waste management systems: An integrated cost-benefit analysis perspective with a financial cost modeling in Taiwan  

Science Conference Proceedings (OSTI)

In order to develop a sound material-cycle society, cost-effective municipal solid waste (MSW) management systems are required for the municipalities in the context of the integrated accounting system for MSW management. Firstly, this paper attempts to establish an integrated cost-benefit analysis (CBA) framework for evaluating the effectiveness of MSW management systems. In this paper, detailed cost/benefit items due to waste problems are particularly clarified. The stakeholders of MSW management systems, including the decision-makers of the municipalities and the citizens, are expected to reconsider the waste problems in depth and thus take wise actions with the aid of the proposed CBA framework. Secondly, focusing on the financial cost, this study develops a generalized methodology to evaluate the financial cost-effectiveness of MSW management systems, simultaneously considering the treatment technological levels and policy effects. The impacts of the influencing factors on the annual total and average financial MSW operation and maintenance (O and M) costs are analyzed in the Taiwanese case study with a demonstrative short-term future projection of the financial costs under scenario analysis. The established methodology would contribute to the evaluation of the current policy measures and to the modification of the policy design for the municipalities.

Weng, Yu-Chi, E-mail: clyde.weng@gmail.com [Solid Waste Management Research Center, Okayama University, Okayama (Japan); Fujiwara, Takeshi [Solid Waste Management Research Center, Okayama University, Okayama (Japan)

2011-06-15T23:59:59.000Z

300

Machine Maintenance Integrated Performance Support System  

SciTech Connect

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Activity HEV Fleet Testing Date Mileage Description Cost 11212012 1,582 Replaced one tire due to road hazard 201.66 12102012 4,291 Replaced brake line - under warranty NC 3...

302

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost 6212012 2,583 Reprogrammed VCM, TCU, and Battery Control Unit - under warranty NC 362013 14,548 Replaced one tire 128.81 3262013 15,250 Rotated tires 20.00...

303

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Activity HEV Fleet Testing Date Mileage Description Cost 842009 5,752 Changed oil and filter 28.25 8192009 10,414 Changed oil and filter and checked all fluids,...

304

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Activity HEV Fleet Testing Date Mileage Description Cost 1142010 6,330 Changed oil and filter and inspected brake system 46.83 2112010 12,302 Changed oil and filter...

305

Operation and Maintenance Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and cost-effective is the first step to obtaining energy-efficient building performance. An O&M assessment provides a systematic look at all aspects of the current O&M...

306

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

HEV Fleet Testing Date Mileage Description Cost 2112013 4,365 Replaced battery cooling fan - under warranty NC 3252013 8,487 Changed oil - under warranty NC 3262013 8,684...

307

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network (OSTI)

to several ones. Keywords: Predictive maintenance, Maintenance engineering, Decision making, Complex systems be answered by using maintenance engineering, and more specifically a computerised maintenance management system that collects the information related to the different maintenance actions. Finally the second

Paris-Sud XI, Université de

308

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

309

Software maintenance maturity model (smmm): the software maintenance process model  

E-Print Network (OSTI)

This paper summarizes the research work leading to a Phd thesis that addresses the assessment and improvement of the software maintenance function by proposing a maturity model for daily software maintenance activities: Software Maintenance Maturity Model (SM mm) as well as its supporting knowledge based system SM Xpert. The software maintenance function suffers from a scarcity of management models to facilitate its evaluation, management, and continuous improvement. The SM mm addresses the unique activities of software maintenance while preserving a structure similar to that of the CMMi ©1 maturity model. It is designed to be used as a complement to this model. The SM mm is based on practitioners ’ experience, international standards, and the seminal literature on software maintenance. This paper presents the model’s purpose, scope, foundation, and architecture, followed by a knowledgebased system to help software maintainers learn and use the maturity model. 1.

Alain April; Jean-marc Desharnais

2005-01-01T23:59:59.000Z

310

Microsoft Word - S05993_CY2009 Annual Rpt.doc  

Office of Legacy Management (LM)

Site Surveillance Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2009 April 2010 LMS/RFS/S05993 This page intentionally left blank LMS/RFS/S05993 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2009 April 2010 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2009 April 2010 Doc. No. S05993 Page i Contents Abbreviations.................................................................................................................................xv Executive Summary .....................................................................................................................

311

Generation Maintenance Applications Center: Conventional Vertical Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Vertical pumps are used in several applications in power plants, such as condensate, heater drain, circulating water, and service water/river water applications.BackgroundThe Maintenance Issue Surveys of the Electric Power Research Institute (EPRI) Generation Maintenance Applications Center (GenMAC) indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for ...

2013-12-19T23:59:59.000Z

312

Nuclear Maintenance Applications Center: Isolated Phase Bus Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides information on design, operating experience, and maintenance practices associated with the isophase bus system. The information is meant to be useful for system engineers, component engineers, maintenance personnel, and their supervision in understanding and maintaining this system. This document is an update to Isolated Phase Bus Maintenance Guide (EPRI report TR-112784), and the scope has been expanded to include boundary components, such as potential transformers (PTs) and current...

2007-12-20T23:59:59.000Z

313

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

the Full Social Costs and Benefits of Transportation, ed. bythe Full Social Costs and Benefits of Transportation, ed. bytransportation infrastructure and services, then we should set prices on the infrastructure and services equal to marginal social costs.

Delucchi, Mark

2005-01-01T23:59:59.000Z

314

Annual Planning Summaries: 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Annual Planning Summaries: 2010 February 24, 2010 2010 Annual Planning Summary for Energy Efficiency and Renewable Energy Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. February 2, 2010 2010 Annual Planning Summary for Chief Financial Officer (CFO) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. February 1, 2010 2010 Annual Planning Summary for Oak Ridge (OR)

315

Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1995 Annual Report.  

Science Conference Proceedings (OSTI)

The Confederated Tribes of the Umatilla Indian Reservoir (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead, fall chinook and coho salmon. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and coho salmon broodstock for monitoring and evaluation purposes. Coded-wire tag recovery information was accessed to determine the contribution of Umatilla river releases to ocean, Columbia River and Umatilla River fisheries.

Rowan, Gerald D.

1996-05-01T23:59:59.000Z

316

Umatilla Hatchery Satellite Facilities; Operations and Maintenance, Annual Report 2001.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem, Thornhollow and Pendleton satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam and South Fork Walla Walla facilities are used for holding and spawning chinook salmon. In some years, Three Mile Dam may also be used for holding and spawning coho salmon. In the spring of 2002, summer steelhead were acclimated and released at Bonifer Pond (54,917), Minthorn Springs (47,521), and Pendleton (54,366). Yearling coho (1,621,857) were also acclimated and released at Pendleton. Yearling spring chinook salmon (876,121) were acclimated and released at Imeques C-mem-ini-kem. At Thornhollow, 520,564 yearling fall chinook and 307,194 subyearling fall chinook were acclimated. In addition, 104,908 spring chinook were transported to Imeques C-mem-ini-kem in November for release in the spring of 2003. CTUIR and ODFW personnel monitored the progress of outmigration for juvenile releases at the Westland Canal juvenile facility. Nearly all juveniles released in the spring migrated downstream prior to the trap being opened in early July. A total of 100 unmarked and 10 marked summer steelhead were collected for broodstock at Three Mile Dam from September 21, 2001, through April 2, 2002. An estimated 180,955 green eggs were taken from 36 females and were transferred to Umatilla Hatchery for incubation and rearing. A total of 560 adult and 26 jack spring chinook salmon were collected for broodstock at Three Mile Dam from April 22 through June 12, 2002, and were transported to South Fork Walla Walla. An estimated 1,017,113 green eggs were taken from 266 females and were transferred to Umatilla Hatchery. Excess unmarked broodstock (seven adult males, five jacks, and 34 females) were released into the South Fork Walla Walla River at the end of spawning. A total of 168 adult and eight jack spring chinook salmon were transferred from Three Mile Dam to South Fork Walla Walla between June 6 and June 23 for temporary holding. On August 8, 154 adults and eight jacks were released into the South Fork Walla Walla River to spawn naturally. A total of 214 adult spring chinook salmon were transferred from Ringold Hatchery to South Fork Walla Walla between June 7 and June 20 for temporary holding. On August 8, 171 were released into natural production areas in the Walla Walla River basin to spawn naturally. A total of 525 adult and 34 jack fall chinook salmon were collected and held for broodstock at Three Mile Dam from September 16 to November 17, 2002. An estimated 678,122 green eggs were taken from 183 females. The eggs were transferred to Umatilla Hatchery. Coho salmon broodstock were not collected in 2002. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and spring and fall chinook salmon broodstock for monitoring and evaluation purposes. Infectious hematopoietic necrosis virus (IHNV) was detected in five of 68 spawned summer steelhead. Summer steelhead were not examined for bacterial kidney disease (Renibacterium salmoninarum; BKD) in 2002. Infectious hematopoietic necrosis virus was detected in 27 of 78 spawned spring chinook females. Two hundred sixty-six spawned spring chinook females were sampled for BKD and two had low to moderate levels of Rs antigen (ELISA OD{sub 405} readings of 0.260 and 0.365). All others had low to negative levels of Rs antigen (ELISA OD{sub 405} readings of 0.00 to 0.099). Twenty-one spring chinook mortalities were examined for culturable bacteria and enteric redmouth disease

Rowan, Gerald

2003-05-01T23:59:59.000Z

317

Annual ENSO  

Science Conference Proceedings (OSTI)

Using various observational data, the seasonal cycle of the tropical Pacific is investigated, suggesting the existence of an “annual El Niño–Southern Oscillation (ENSO).” A positive sea surface temperature anomaly (SSTA) appearing off Peru in ...

Tomoki Tozuka; Toshio Yamagata

2003-08-01T23:59:59.000Z

318

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

This document is the 2010 version of Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New content this year includes: (1) A section on static mixers added in Chapter 3; (2) Substantial expansion of the discussion on inspection of ammonia storage and delivery equipment in Chapter 8; (3) Expanded coverage of unit startup, shutdown, and low-load operation in Chapter 15; (4) a new chapter, Chapter 18, on the means to ensure tha...

2010-11-29T23:59:59.000Z

319

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

This report is the 2011 update of Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New and revised content this year includes: (1) an analysis of the performance of the U.S. fleet of selective catalytic reduction (SCR)equipped generating units in 2009, 2010, and 2011; (2) a discussion of experience in mitigating the role of arsenic in catalyst deactivation, including the addition of alkali material to the coal; (3) an updat...

2011-12-16T23:59:59.000Z

320

Cost analysis guidelines  

Science Conference Proceedings (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Development Pathways to Low-Cost Engineering Beta Gamma TiAl ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2010 TMS Annual Meeting & Exhibition. Symposium , Cost-Affordable Titanium III. Presentation Title, Development Pathways to ...

322

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

323

Equipment Maintenance Optimization Manual Applications  

Science Conference Proceedings (OSTI)

This report is a compilation of Equipment Maintenance Optimization Manuals (EMOMs) that include procedures and troubleshooting supported by broad-based utility experience. EMOMs for critical generating station equipment allows power generating plants to replace existing maintenance practices with the latest industry best practices. Using this information as a benchmark, current practices can be validated or adjusted for more optimum performance of the overall maintenance process. In addition, the EMOMs c...

2001-12-21T23:59:59.000Z

324

Sustainability of green space maintenance  

E-Print Network (OSTI)

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

325

Petroleum marketing annual 1993  

SciTech Connect

The Petroleum Marketing Annual (PMA) contains statistical data on a variety of crude oils and refined petroleum products. The publication provides statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the free-on-board (f.o.b.) and landed cost of imported crude oil, and the refiners acquisition cost of crude oil. Sales data for motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane are presented. For this publication, all estimates have been recalculated since their earlier publication in the Petroleum Marketing Monthly (PMM). These calculations made use of additional data and corrections that were received after the PMM publication dates.

1995-01-01T23:59:59.000Z

326

Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Sys tems and Plant Equipment  

Science Conference Proceedings (OSTI)

For operators to take maximum advantage of digital technology being implemented in nuclear power plants, they must reduce the cost and likelihood of human errors in maintenance and testing of new digital systems and human-system interfaces (HSIs). Designing for maintenance and testing is a fundamental part of the design effort for any plant system -- and digital upgrade modifications are no exception. This report provides guidance for plant operators and designers for achieving cost-effective maintainabi...

2004-10-11T23:59:59.000Z

327

Pacific Northwest National Laboratory Grounds Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pacific Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The program has helped the laboratory reduce its water use for irrigation by 30%. PNNL is located in Richland, Washington, and is managed and operated by Battelle for the U.S. Department of Energy (DOE). PNNL scientists and engineers perform research on a variety of subjects, including energy and national security. PNNL has more than 4,200 staff members, sits on 600 acres, and houses 2 million square feet of facilities. The laboratory is located in an arid region of the state, receiving only eight inches of precipitation annually. It has more than 100 acres of turf and landscaped areas and

328

Reliability-Centered Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

329

Federal Energy Management Program: Reactive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

330

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

331

Federal Energy Management Program: Preventive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

332

Nuclear Maintenance Applications Center: Reactor Recirculation Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

In 1993, the Electric Power Research Institute (EPRI) published Main Coolant Pump Seal Maintenance Guide (report TR-100855). That report provides guidance on maintenance and troubleshooting of main coolant pump seals but was generic in naturethe information was relevant to pressurized water reactors (PWRs) and boiling water reactors (BWRs).

2008-12-18T23:59:59.000Z

333

Nuclear Maintenance Applications Center: Emergency Diesel Generator Condition- Based Maintenance  

Science Conference Proceedings (OSTI)

Condition-based maintenance practices that were developed in the United States in the 1990s for emergency diesel generators (EDGs) have not been fully adopted by international nuclear plant operators. To encourage broader use of such practices, NMAC formed a technical advisory group of international utilities interested in learning more about condition-based EDG maintenance practices.

2008-12-19T23:59:59.000Z

334

Nuclear Maintenance Application Center: Characterizing International Maintenance Practices  

Science Conference Proceedings (OSTI)

In 1987, the Electric Power Research Institute (EPRI) published report NP-5185-SR, Maintenance of European Nuclear Power Plants. The project comprised visits to six plant sites in six European countries over a two-week period and reported on the state of the various maintenance processes and programs in use at each location.

2012-08-07T23:59:59.000Z

335

cost | OpenEI  

Open Energy Info (EERE)

cost cost Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

336

Federal Requirements for Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations & Maintenance » Federal Requirements Operations & Maintenance » Federal Requirements for Operations and Maintenance Federal Requirements for Operations and Maintenance October 4, 2013 - 5:09pm Addthis The following laws and regulations set advanced metering and measurement requirements for Federal agencies. Energy Policy Act (EPAct) of 2005: Requires all Federal buildings to be metered by October 1, 2012, to ensure efficient energy use and reduce the cost of electricity used in Federal facilities. Advanced meters or metering devices must provide data at least daily and measure the consumption of electricity at least hourly. These devices must be used to the maximum extent practical. Requires Federal agencies to submit to the U.S. Department of Energy (DOE) an implementation plan identifying personnel responsible for achieving

337

Gas Turbine Technology, Part B: Components, Operations and Maintenance  

E-Print Network (OSTI)

This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative, single and split shaft. The pros and cons of different types are reviewed. Gas turbine component types - axial and centrifugal compressors and different turbine types, along with combustor types will be discussed. Important considerations during machine specifications are also reviewed. Practical aspects such as coatings, materials, fuel handling and auxiliary systems will also be highlighted. Operations and maintenance aspects including Preventative Maintenance, Repairs, Fuel and Air Filtration, Compressor Washing and Reliability is discussed. Typical operating and maintenance costs are provided. This paper presents an extensive bibliography to enable readers to follow up any topic in detail.

Meher-Homji, C. B.; Focke, A. B.

1985-05-01T23:59:59.000Z

338

External costs of intercity truck freight transportation  

E-Print Network (OSTI)

From a societal perspective, it is desirable for all transportation users to pay their full social (private and external) costs. We estimate four general types of external costs for intercity freight trucking and compare them with the private costs incurred by carriers. Estimated external costs include: accidents (fatalities, injuries, and property damage); emissions (air pollution and greenhouse gases); noise; and unrecovered costs associated with the provision, operation, and maintenance of public facilities. The analysis reveals that external costs are equal to 13.2 % of private costs and user fees would need to be increased about

David J. Forkenbrock

1999-01-01T23:59:59.000Z

339

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009  

SciTech Connect

This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

None

2010-10-01T23:59:59.000Z

340

NERSC Annual Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC Annual Reports NERSC Annual Reports Sort by: Default | Name anrep2000.png NERSC Annual Report 2000 Download Image: anrep2000.png | png | 203 KB Download File:...

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

BCP Annual Rate Process  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 BCP Annual Rate Process 2013 BCP Annual Rate Process Informal Process Rate Activity Schedule (doc) Informal Customer Meeting Thursday March 6, 2013 at 10:30 A.M. Conf Rms 3&4 Informal Customer Meeting Presentation (Pdf) PRS Executive Summary (Mar 07, 2013) (Pdf) FY2014 Final Ten Year Operating Plan PRS Executive Summary (PDF) FORM for Foreign Visits (doc) Formal Process Initial Federal Register Notice (pdf) Public Information Forum March 27,2013 at 10:30 A.M. Conf Rms3&4 Customer Meeting Presentation PIF Presentation (PPT) Presentation Details (pdf) Reclamation Fund Status Report PIF PRS Executive Summary (pdf) PIF Transcripts (PDF) Visitor Center Cost Analysis Questions - Responses Public Comment Forum April 10, 2013 at 10:30 A.M. Conf Rms3&4 PCF Transcripts Customer Letters

342

Capital costs have major impact on projected power sector ...  

U.S. Energy Information Administration (EIA)

Natural gas-fired power plants dominate the 2011 Annual ... AEO2011 also includes several alternative cases with lower assumed capital costs of nuclear, fossil fuel ...

343

Costs of Imported Crude Oil for Selected Crude Streams  

Gasoline and Diesel Fuel Update (EIA)

Energy Information Administration Petroleum Marketing Annual 1995 51 Table 29. F.O.B. a Costs of Imported Crude Oil for Selected Crude Streams (Dollars per Barrel) - Continued...

344

Five Low Cost Methods to Improve Energy Efficiency on ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2010 TMS Annual Meeting & Exhibition. Symposium , Energy Conservation in Metals. Presentation Title, Five Low Cost Methods to ...

345

Achieving world class maintenance status  

Science Conference Proceedings (OSTI)

The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

2007-08-15T23:59:59.000Z

346

Maintenance cost studies of rotary wing commercial transport aircraft  

E-Print Network (OSTI)

Introduction: The vertical take-off and landing (VTOL) aircraft market has had substantial growth in the period of the last ten years when one considers the overall number of aircraft in use. The military fleet has continued ...

Ausrotas, Raymond A.

1974-01-01T23:59:59.000Z

347

Managing maintenance costs of pharmaceutical research and development  

E-Print Network (OSTI)

Drug Discovery is a race to be the first to patent a drug that meets a significant medical need in the world. Many pharmaceutical companies are now using automation extensively to improve consistency and aid personnel in ...

Butts, Jared (Jared C.)

2009-01-01T23:59:59.000Z

348

Fire Protection Equipment Surveillance Optimization and Maintenance Guide  

Science Conference Proceedings (OSTI)

Performance-based analysis methods are finding widespread application in many industries, including the nuclear power industry, and in many areas, including design, maintenance, and operations. Fire protection surveillance tests and inspections are well suited for performance-based analysis and trending, so transitioning to a performance-based program is achievable and cost-effective for nuclear power plants.

2003-07-18T23:59:59.000Z

349

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

350

Annual Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 THROUGH 09/30/2010 The following Annual Freedom of Information Act report covers the Period 10/01/2009, through 09/30/2010, as required by 5 U.S.C. 552. I. BASIC INFORMATION REGARDING REPORT 1. Kevin T. Hagerty, Director Office of Information Resources, MA-90 U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 202-586-5955 Alexander Morris, FOIA Officer Sheila Jeter, FOIA/Privacy Act Specialist FOIA Office, MA-90 Office of Information Resources U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 202-586-5955 2. An electronic copy of the Freedom of Information Act (FOIA) report can be obtained at http://management.energy.gov/documents/annual_reports.htm. The report can then be accessed by clicking FOIA Annual Reports.

351

Turbine-Generator Maintenance Interval Optimization Using a Financial Risk Assessment Technique  

Science Conference Proceedings (OSTI)

Turbine-generator (T-G) maintenance interval selection is evolving from a time-based and reliability-centered approach to an approach based on financial risk. The new financial-based decision methods seek to reduce each unit's maintenance costs to the lowest level consistent with safe operation, while balancing operations and maintenance (O&M) expenditures optimally over the entire plant or system. EPRI's Turbo-X software provides a powerful planning tool for engineers to evaluate specific proposals for ...

2000-11-21T23:59:59.000Z

352

Catalogue and Assessment of Industry Maintenance Best Practices for Substation Equipment  

Science Conference Proceedings (OSTI)

Utilities have been maintaining substation equipment reliably since the industry's inception, but now many are facing increased challenges to reduce operating and maintenance costs without adversely affecting service levels. In this setting, utilities may benefit from knowing what programs and techniques their peers have implemented. To that end, EPRI conducted a series of industry surveys assessing key substation equipment maintenance practices. As utilities consider modifying their maintenance programs...

2011-12-21T23:59:59.000Z

353

Streamlined Reliability-Centered Maintenance (SRCM) Program for Fossil-Fired Power Plants  

Science Conference Proceedings (OSTI)

Following EPRI's philosophy to use and expand existing technology if it makes economic sense, the Institute's Plant Maintenance Optimization Target has adopted a reliability-centered maintenance (RCM) process called Streamlined RCM, or SRCM. SRCM provides a utility a cost-effective process to determine the optimum maintenance strategy for plant systems and equipment based on importance to business objectives. SRCM maintains all the basic steps of traditional RCM.

1998-03-25T23:59:59.000Z

354

A cask maintenance facility feasibility study  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

355

New York Power Authority Identifies More than $1.8 Million in Savings Annually with RCM at Its Hydro Generating Stations  

Science Conference Proceedings (OSTI)

Member Quote“The NYPA Team, working with the EPRI Solutions staff, has identified measurable savings in O&M costs at our hydro plants, while maintaining the high standard of reliability for which we are recognized”--Randy Crissman, Vice President, Business Development and Asset Management, New York Power Authority In BriefThe New York Power Authority (NYPA) identified nearly $1.8 million in annual savings by applying reliability-centered maintenance (RCM) to the mechanical equipment at its hydro generati...

2006-08-29T23:59:59.000Z

356

Federal Energy Management Program: Predictive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

357

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011  

SciTech Connect

This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

None

2012-03-01T23:59:59.000Z

358

HFBR Surveillance & Maintenance and Monitoring  

NLE Websites -- All DOE Office Websites (Extended Search)

the Suffolk County Department of Health Services - quarterly, and is summarized in an annual report. Any unexpected data results are communicated to the regulators during weekly...

359

Technology, Safety and Costs of Decommissioning a Reference Uranium Hexafluoride Conversion Plant  

Science Conference Proceedings (OSTI)

Safety and cost information is developed for the conceptual decommissioning of a commercial uranium hexafluoride conversion (UF{sub 6}) plant. Two basic decommissioning alternatives are studied to obtain comparisons between cost and safety impacts: DECON, and passive SAFSTOR. A third alternative, DECON of the plant and equipment with stabilization and long-term care of lagoon wastes. is also examined. DECON includes the immediate removal (following plant shutdown) of all radioactivity in excess of unrestricted release levels, with subsequent release of the site for public use. Passive SAFSTOR requires decontamination, preparation, maintenance, and surveillance for a period of time after shutdown, followed by deferred decontamination and unrestricted release. DECON with stabilization and long-term care of lagoon wastes (process wastes generated at the reference plant and stored onsite during plant operation} is also considered as a decommissioning method, although its acceptability has not yet been determined by the NRC. The decommissioning methods assumed for use in each decommissioning alternative are based on state-of-the-art technology. The elapsed time following plant shutdown required to perform the decommissioning work in each alternative is estimated to be: for DECON, 8 months; for passive SAFSTOR, 3 months to prepare the plant for safe storage and 8 months to accomplish deferred decontamination. Planning and preparation for decommissioning prior to plant shutdown is estimated to require about 6 months for either DECON or passive SAFSTOR. Planning and preparation prior to starting deferred decontamination is estimated to require an additional 6 months. OECON with lagoon waste stabilization is estimated to take 6 months for planning and about 8 months to perform the decommissioning work. Decommissioning cost, in 1981 dollars, is estimated to be $5.91 million for OECON. For passive SAFSTOR, preparing the facility for safe storage is estimated to cost $0.88 million, the annual maintenance and surveillance cost is estimated to be about $0.095 million, and deferred decontamination is estimated to cost about $6.50 million. Therefore, passive SAFSTOR for 10 years is estimated to cost $8.33 million in nondiscounted 1981 dollars. DECON with lagoon waste stabilization is estimated to cost about $4.59 million, with an annual cost of $0.011 million for long-term care. All of these estimates include a 25% contingency. Waste management costs for DECON, including the net cost of disposal of the solvent extraction lagoon wastes by shipping those wastes to a uranium mill for recovery of residual uranium, comprise about 38% of the total decommissioning cost. Disposal of lagoon waste at a commercial low-level waste burial ground is estimated to add $10.01 million to decommissioning costs. Safety analyses indicate that radiological and nonradiological safety impacts from decommissioning activities should be small. The 50-year committed dose equivalent to members of the public from airborne releases during normal decommissioning activities is estimated to 'Je about 4.0 man-rem. Radiation doses to the public from accidents are found to be very low for all phases of decommissioning. Occupational radiation doses from normal decommissioning operations (excluding transport operations) are estimated to be about 79 man-rem for DECON and about 80 man-rem for passive SAFSTOR with 10 years of safe storage. Doses from DECON with lagoon waste stabilization are about the same as for DECON except there is less dose resulting from transportation of radioactive waste. The number of fatalities and serious lost-time injuries not related to radiation is found to be very small for all decommissioning alternatives. Comparison of the cost estimates shows that DECON with lagoon waste stabilization is the least expensive method. However, this alternative does not allow unrestricted release of the site. The cumulative cost of maintenance and surveillance and the higher cost of deferred decontamination makes passive SAFSTOR more expensive than DECON. Seve

Elder, H. K.

1981-10-01T23:59:59.000Z

360

Institute for Software Technology Maintenance Proze  

E-Print Network (OSTI)

Maintenance Institute for Software Technology Ersatz es bestehenden Systems Idee: Maintenance ist teuer. Durch! #12;VU Software Maintenance Institute for Software Technology Fehler im neuen System Software ist Management berücksichtigt Maintenance-Ziele und Rahmenbedingungen VU Software Maintenance Institute

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

A Comparison of Canadian and U.S. Hydro Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Phase 1 of the Comparison of Canadian & American Hydro Operations & Maintenance Practices project indicates that hydroelectric plants in Canada have significantly lower operations and maintenance (O&M) costs than those in the United States. Phase 2, focused on a more in-depth investigation, will begin as soon as permission is granted by the respective plant owners.

1997-12-22T23:59:59.000Z

362

A model-based approach for data integration to improve maintenance management by mixed reality  

Science Conference Proceedings (OSTI)

Facilitating interaction with maintenance systems through intuitive interfaces is a competitive advantage in terms of time and costs for industry. This work presents the CARMMI approach, which aims to integrate information coming from CAx tools, mixed/augmented ... Keywords: Data modeling/visualization, Industrial maintenance, Mixed reality, Product data management

DanúBia Bueno EspíNdola; Luca Fumagalli; Marco Garetti; Carlos E. Pereira; Silvia S. C. Botelho; Renato Ventura Henriques

2013-05-01T23:59:59.000Z

363

Motor-Vehicle Infrastructure and Services Provided by the Public Sector: Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

Blincoe, The Economic Cost of Motor Vehicle Crashes, 1994,M. Faigin, The Economic Cost of Motor Vehicle Crashes, 1990,Q. Wang, and D. L. Greene, Motor Vehicle Fuel Economy, The

Delucchi, Mark; Murphy, James

2005-01-01T23:59:59.000Z

364

MOTOR-VEHICLE INFRASTRUCTURE AND SERVICES PROVIDED BY THE PUBLIC SECTOR Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

Blincoe, The Economic Cost of Motor Vehicle Crashes, 1994,M. Faigin, The Economic Cost of Motor Vehicle Crashes, 1990,Q. Wang, and D. L. Greene, Motor Vehicle Fuel Economy, The

Delucchi, Mark

2005-01-01T23:59:59.000Z

365

Outsourcing transportation infrastructure maintenance : a theoretical approach with application to JR East  

E-Print Network (OSTI)

In transportation agencies, how to reduce maintenance and operation cost is one of the biggest and most common concerns, because their revenue is not expected to increase drastically in the future. One of the solutions ...

Hirano, Jun, 1974-

2004-01-01T23:59:59.000Z

366

Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook  

Science Conference Proceedings (OSTI)

Power plant engineering is a specialized form of engineering not usually taught in universities. In an effort to provide degreed mechanical, electrical, chemical, civil, and nuclear engineers and maintenance specialists the practical information needed to quickly become effective plant engineers, the Electric Power Research Institute (EPRI) developed the Maintenance Engineer Fundamentals Handbook: An EPRI Course (TR-106853) and corresponding training course in 1996. As the retirement rate of today's hig...

2007-12-20T23:59:59.000Z

367

Nuclear Maintenance Applications Center: Preventive Maintenance Program Guideline  

Science Conference Proceedings (OSTI)

Over the years, the Electric Power Research Institute (EPRI) has developed many technical documents to aid in developing effective preventive, predictive, and condition monitoring maintenance programs to ensure equipment reliability and availability. The industry has drawn on this information to establish or enhance preventive maintenance (PM) programs. However, not all PM program processes have been implemented, leaving some programs marginally effective and vulnerable to failure. The purpose of this re...

2011-07-11T23:59:59.000Z

368

Nuclear Maintenance Applications Center: Crane Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

This report is an update to the original guideline, published in December 2000 as Electric Power Research Institute (EPRI) report 1000986, and supersedes it in its entirety. This updated guide provides technical, maintenance, operational, training, inspection, and troubleshooting information for overhead bridge cranes used in nuclear power plants. Individual utilities can use this guide as a reference document that provides detailed component information, in-depth overhead bridge crane maintenance practi...

2011-03-07T23:59:59.000Z

369

Maintenance-free automotive battery  

SciTech Connect

Two types of maintenance-free automotive batteries were developed by Japan Storage Battery Co. to obtain a maintenance-free battery for practical use and to prevent deterioration of the battery during long storage and/or shipment. Design considerations included a special grid alloy, the separator, plate surface area, vent structure, and electrolyte. Charge characteristics, overcharge characteristics, life characteristics under various conditions, and self-discharge characteristics are presented. The characteristics of the maintenance-free battery with a Pb-Ca alloy grid are superior to those of a conventional battery. 10 figures, 1 table. (RWR)

Kano, S.; Ando, K.

1978-01-01T23:59:59.000Z

370

Actions You Can Take to Reduce Cooling Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Fact Sheet Actions You Can Take to Reduce Cooling Costs Cooling costs can be a substantial part of your facility's annual utility bill. A number of energy savings opportunities...

371

Oil and Gas Lease Equipment and Operating Costs 1994 Through...  

Gasoline and Diesel Fuel Update (EIA)

cost reported here could be higher than the actual annual average for 2008. However, some production costs (labor and equipment) are not as volatile as drilling, pipe, and other...

372

The Market Value and Cost of Solar Photovoltaic Electricity Production  

E-Print Network (OSTI)

per kWh produced than baseload coal, nuclear or combined-even. The model includes a baseload technology with high ?annual production cost are: Baseload (coal) Cost = $208247/M

Borenstein, Severin

2008-01-01T23:59:59.000Z

373

Predictive Maintenance Primer: Revision to NP-7205  

Science Conference Proceedings (OSTI)

The "Predictive Maintenance Primer" revision provides nuclear plant personnel with current information regarding the predictive maintenance technologies and their applications. This guide will assist a plant in improving its predictive maintenance program.

2003-11-06T23:59:59.000Z

374

Optimal scheduling of fighter aircraft maintenance  

E-Print Network (OSTI)

The effective scheduling of fighter aircraft maintenance in the Air Force is crucial to overall mission accomplishment. An effective maintenance scheduling policy maximizes the use of maintenance resources and aircraft ...

Cho, Philip Y

2011-01-01T23:59:59.000Z

375

Robust Maintenance Policies in Asset Management  

E-Print Network (OSTI)

Optimal Maintenance and Repair Policies in Asset ManagementROBUST MAINTENANCE POLICIES IN ASSET MANAGEMENT Kenneth D.management policies and shows how the proposed approach may reduce maintenance and

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

376

An Outlook on Truth Maintenance  

E-Print Network (OSTI)

Truth maintenance systems have been used in several recent problem solving systems to record justifications for deduced assertions, to track down the assumptions which underlie contradictions when they arise, and to ...

McAllester, David A.

1980-08-01T23:59:59.000Z

377

Maintenance of DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

378

Condition-Based Maintenance Guideline  

Science Conference Proceedings (OSTI)

Since the 1980s, EPRI has published various documents relating to predictive or condition-based maintenance (CBM) programs. These documents have served as a foundation for predictive maintenance programs within our industry. Many of these published documents are now more than 10 years old. As a result, EPRI is reviewing these documents to compare them with current practices and programs. EPRIs initial goal is to revise and update the guidance and create a principal core document on predictive and conditi...

2011-11-16T23:59:59.000Z

379

Federal Energy Management Program: Computerized Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

380

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program Management to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Management on Facebook Tweet about...

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Federal Energy Management Program: Computerized Maintenance Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Maintenance Management Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and...

382

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Find out about effective metering at Federal facilities Computerized Maintenance Management Systems: Learn about the evaluation and integration of these systems Maintenance...

383

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Best Practices Guide to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Best Practices Guide on Facebook Tweet about...

384

The Engineered Approach to Energy and Maintenance Effective Steam Trapping  

E-Print Network (OSTI)

The engineered approach to steam trap sizing, selection and application has proven effective in significantly reducing a plant's fuel consumption, maintenance and trap replacement costs while improving thermal efficiency and overall steam system performance. New field test procedures for measuring condensate load and steam loss have proven valuable in sizing traps and to determine which trap is the most energy efficient. The combination of using the engineered approach to steam trapping, field tests to verify trap performance and good maintenance practices has contributed to a major reduction in energy consumption of 10-50% in many industrial plants.

Krueger, R. G.; Wilt, G. W.

1980-01-01T23:59:59.000Z

385

Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2  

SciTech Connect

This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400

Poderis, Reed J. [NSTec] [NSTec; King, Rebecca A. [NSTec] [NSTec

2013-09-30T23:59:59.000Z

386

Annual Energy  

Gasoline and Diesel Fuel Update (EIA)

11) | April 2011 11) | April 2011 with Projections to 2035 Annual Energy Outlook 2011 For further information . . . The Annual Energy Outlook 2011 was prepared by the U.S. Energy Information Administration (EIA), under the direction of John J. Conti (john.conti@eia.gov, 202-586-2222), Assistant Administrator of Energy Analysis; Paul D. Holtberg (paul.holtberg@eia.gov, 202/586-1284), Co-Acting Director, Office of Integrated and International Energy Analysis, and Team Leader, Analysis Integration Team; Joseph A. Beamon (joseph.beamon@eia.gov, 202/586-2025), Director, Office of Electricity, Coal, Nuclear, and Renewables Analysis; A. Michael Schaal (michael.schaal@eia.gov, 202/586-5590), Director, Office of Petroleum, Gas, and Biofuel Analysis;

387

ANNUAL ENERGY  

Gasoline and Diesel Fuel Update (EIA)

(93) (93) ANNUAL ENERGY OUTLOOK 1993 With Projections to 2010 EIk Energy Information Administration January 1993 For Further Information ... The Annual Energy Outlook (AEO) is prepared by the Energy Information Administration (EIA), Office of Integrated Analysis and Forecasting, under the direction of Mary J. Hutzler (202/586-2222). General questions concerning energy demand or energy markets may be addressed to Mark E. Rodekohr (202/586-1130), Director of the Energy Demand and Integration Division. General questions regarding energy supply and conversion activities may be addressed to Mary J. Hutzler (202/586-2222), Acting Director of the Energy Supply and Conversion Division. Detailed questions may be addressed to the following EIA analysts: Framing the 1993 Energy Outlook ............. Susan H. Shaw (202/586-4838)

388

Annual Report  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 2011 Annual Report to the Oak Ridge Community Annual Report to the Oak Ridge Community DOE/ORO/2399 Progress Cleanup P Progress Cleanup P 2 This report was produced by URS | CH2M Oak Ridge LLC, DOE's Environmental Management contractor for the Oak Ridge Reservation. About the Cover After recontouring and revegetation, the P1 Pond at East Tennessee Technology Park is flourishing. The contaminated pond was drained, recontoured, and restocked with fish that would not disturb the pond sediment. 1 Message from the Acting Manager Department of Energy Oak Ridge Office To the Oak Ridge Community: Fiscal Year (FY) 2011 marked many accomplishments in Oak Ridge. Our Environmental Management (EM) program completed a majority of its American Recovery and Reinvestment Act (ARRA)-funded projects,

389

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

July (1996). Motor Vehicle Manufacturers Association of theaddition, some motor-vehicle manufacturers have been finedEPA charges motor-vehicle manufacturers to cover the cost of

Delucchi, Mark

2005-01-01T23:59:59.000Z

390

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O&M Best Practices Guide, Release 3.0 6.1 O&M Best Practices Guide, Release 3.0 6.1 Chapter 6 Predictive Maintenance Technologies 6.1 Introduction Predictive maintenance attempts to detect the onset of a degradation mechanism with the goal of correcting that degradation prior to significant deterioration in the component or equipment. The diagnostic capabilities of predictive maintenance technologies have increased in recent years with advances made in sensor technologies. These advances, breakthroughs in component sensitivities, size reductions, and most importantly, cost, have opened up an entirely new area of diagnostics to the O&M practitioner. As with the introduction of any new technology, proper application and TRAINING is of

391

MOTOR-VEHICLE INFRASTRUCTURE AND SERVICES PROVIDED BY THE PUBLIC SECTOR Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

ACF = B + AF (short-run cost) ACF 91 (1.0) ACF 0 ACF ²ACM ²ACM ACF = AF k (long-run cost) B ²AM AF ²AM AF 0 AF 91 (1.0)is simply: DRAFT FOR REVIEW ACF = AF k ACF ? AF ? where: ACF

Delucchi, Mark

2005-01-01T23:59:59.000Z

392

Motor-Vehicle Infrastructure and Services Provided by the Public Sector: Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

ACF = B + AF (short-run cost) ACF 91 (1.0) ACF 0 ACF ²ACM ²ACM ACF = AF k (long-run cost) B ²AM AF ²AM AF 0 AF 91 (1.0)is simply: DRAFT FOR REVIEW ACF = AF k ACF ? AF ? where: ACF

Delucchi, Mark; Murphy, James

2005-01-01T23:59:59.000Z

393

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

E-Print Network (OSTI)

payback time versus building size Project costs and energyPayback time (commissioning cost/annual energy savings) lessenergy payback time of 41 years, while the proper allocation of costs and

Mills, Evan

2010-01-01T23:59:59.000Z

394

Microsoft Word - S09641_2012Annual.docx  

Office of Legacy Management (LM)

2 2 April 2013 LMS/RFS/S09641 This page intentionally left blank LMS/RFS/S09641 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2012 April 2013 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2012 April 2013 Doc. No. S09641 Page i Contents Abbreviations ............................................................................................................................... xvi Executive Summary ..................................................................................................................... xxi

395

The International Coal Statistics Data Base program maintenance guide  

SciTech Connect

The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig.

Not Available

1991-06-01T23:59:59.000Z

396

NMAC Post Maintenance Testing Guide, Revision 1  

Science Conference Proceedings (OSTI)

This Nuclear Maintenance Applications Center (NMAC) guide addresses the concern of member utilities regarding the adequacy and consistency of post-maintenance testing programs. The guide provides information on structuring, developing, organizing, and controlling a post-maintenance testing program in a power plant. It stresses the importance of advance planning to post-maintenance testing.

2004-12-08T23:59:59.000Z

397

Generator Bushing Installation and Maintenance Guide  

Science Conference Proceedings (OSTI)

This report is a comprehensive guide to generator high-voltage bushing (HVB) installation and maintenance.

2008-12-04T23:59:59.000Z

398

A Portable Expert System for Gas Turbine Maintenance  

E-Print Network (OSTI)

Combustion turbines for electric power generation and industrial applications have steadily increased in size, efficiency and prominence. The newest class of gas turbine-generators coming into service will deliver 150 megawatts, with turbine inlet temperatures of 2300° F. To sustain high levels of performance and reliability of this equipment, diagnostics and maintenance planning have also become increasingly important. Within the electric power industry, for example, as the overall fleet of gas turbines has aged, their annual service factor has increased to carry more of the peak load burden as reserve margins shrink. However, peaking duty requires frequent cycling with large thermal stresses that tend to shorten the life of hot section components. To assist the industry in meeting these needs, EPRI has developed The SA?VANT™ System. This unique multi-faceted portable unit will apply a broad range of expert systems in the workplace for power plant maintenance, including turbomachinery of all types, but especially for gas turbines.

Quentin, G. H.

1989-09-01T23:59:59.000Z

399

Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2005 Annual Operation Plan, 2004 Annual Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

Harty, Harold R.; Lundberg, Jeffrey H.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2005-02-01T23:59:59.000Z

400

Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2004 Annual Operation Plan, 2003 Annual Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

Harty, Harold R.; Penney, Aaron K.; Larson, Roy Edward (Nez Perce Tribe, Lapwai, ID)

2005-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

CRAD, Maintenance Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

402

Circuit Breaker Maintenance; Volume 1: Low-Voltage Circuit Breakers; Part 2: GE AK Models: Volume 1: Low-Voltage Circuit Breakers Pa rt 2: GE AK Models  

Science Conference Proceedings (OSTI)

This comprehensive guide will help utilities improve their maintenance of GE model AK circuit breakers. It consolidates industry guidelines, applicable standards, original equipment manufacturer recommendations, and hands-on experience relative to these circuit breakers. Ultimately, improved maintenance will increase reliability and reduce costs associated with corrective maintenance and equipment downtime.

1992-05-02T23:59:59.000Z

403

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010  

SciTech Connect

This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

None

2011-03-01T23:59:59.000Z

404

Optimized Maintenance of Generator Rotors  

Science Conference Proceedings (OSTI)

Generator rotor maintenance options are limited and expensive. The timing and scope of work done requires optimization to obtain the maximum benefits for continued long-term trouble-free operation. This document is a comprehensive guide to the maintenance of large generator rotors of 2 and 4 pole design that are cooled directly or indirectly by air or hydrogen. These include 50 and 60 Hz machines, operating at speeds of 1500, 1800, 3000, and 3600 RPM. The guide does not cover water-cooled rotors. The inf...

2004-12-13T23:59:59.000Z

405

Cost of Fuel to General Electricity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Fuel to Generate Electricity of Fuel to Generate Electricity Cost of Fuel to Generate Electricity Herb Emmrich Gas Demand Forecast, Economic Analysis & Tariffs Manager SCG/SDG&E SCG/SDG&E Federal Utility Partnership Working Group (FUPWG) 2009 Fall Meeting November 18, 2009 Ontario, California The Six Main Costs to Price Electricity are:  Capital costs - the cost of capital investment (debt & equity), depreciation, Federal & State income taxes and property taxes and property taxes  Fuel costs based on fuel used to generate electricity - hydro, natural gas, coal, fuel oil, wind, solar, photovoltaic geothermal biogas photovoltaic, geothermal, biogas  Operating and maintenance costs  Transmission costs  Distribution costs  Social adder costs - GHG adder, low income adder,

406

Price of electricity tracks cost of living  

SciTech Connect

The retail price of electricity and the consumer price index are rising at about the same rate: 241.5 and 242.6, respectively, based on a 1967 index of 100. Increases in fossil fuel costs, wages, and the cost of borrowed funds have contributed to these changes. Details of the annual percentage changes are summarized in five tables. (DCK)

Not Available

1980-09-01T23:59:59.000Z

407

Annual Reports | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Documents Documents » Annual Reports Annual Reports Note: Some of the following documents are in PDF and will require Adobe Reader for viewing. Freedom of Information Act Annual Reports Annual Report for 2012 Annual Report for 2011 Annual Report for 2010 Annual Report for 2009 Annual Report for 2008 (pdf) Annual Report for 2007 (pdf) Annual Report for 2006 (pdf) Annual Report for 2005 (pdf) Annual Report for 2004 (pdf) Annual Report for 2003 (pdf) Annual Report for 2002 (pdf) (Revised 11/03/03) Annual Report for 2001 (pdf) Annual Report for 2000 (pdf) Annual Report for 1999 (pdf) Annual Report for 1998 (pdf) Annual Report for 1997 (pdf) Annual Report for 1996 (pdf) Annual Report for 1995 (pdf) Annual Report for 1994 (pdf) Chief FOIA Officers Reports Aviation Management Green Leases

408

Operations and Maintenance Manual for Large Aperture Scanner System  

Science Conference Proceedings (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

409

NERSC Annual Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Reports NERSC Annual Reports Sort by: Default | Name annrep2011.png NERSC Annual Report 2011 Download Image: annrep2011.png | png | 2.7 MB Download File: annrep2011.pdf |...

410

Electricity Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Emissions Caps and the Impact of a Radical Change in Nuclear Electricity Costs journal International Journal of Energy Economics and Policy volume year month chapter...

411

U. S. Military Expenditures to Protect the Use of Persian Gulf Oil for Motor Vehicles: Report #15 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

on U.S. dependence on foreign oil: “…protecting againston U.S. dependence on foreign oil, that the cost of the 1991U.S. dependence on foreign oil is not to reduce military

Delucchi, Mark; Murphy, James

2006-01-01T23:59:59.000Z

412

Nuclear Maintenance Applications Center: Foreign Material Exclusion Guidelines  

Science Conference Proceedings (OSTI)

Foreign material exclusion (FME) is vital to the safe and reliable operation of nuclear power plants. The entry of foreign material (FM) into primary or secondary plant systems, equipment, and components can cause equipment degradation or inoperability, lost generation, fuel cladding damage, high radiation, and contamination levels that could spread throughout plant systems; it can also increase operations and maintenance (O&M) costs and adversely impact nuclear safety. The FME program is a plantwide ini...

2008-07-01T23:59:59.000Z

413

Attachment Implementation Procedures to Report Deferred, Actual...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

maintenance costs should be reported from asset-level data collected in the Site's Maintenance Management and Financial Management Systems. b. Annual Required Maintenance...

414

Reasons for choosing CP2 pavement design: Requires less frequent maintenance, repair and rehabilitation.  

E-Print Network (OSTI)

tubes (ASTM A276) minimum Yield Strength of 60 ksi. Life Expectancy · 50+ Years Cost per square foot Approximately $10.56 per Square Foot (Plain Cement Concrete Pavement, RPS, 15" Depth) 72,207 SQ YD @ $95.00/SQ Roadway Delay cost produced by congestion of Maintenance and Protection of Traffic due to frequent

415

Substation battery-maintenance procedures  

SciTech Connect

The frequency of substation battery failures is gratifyingly low. One trouble spot appears to be extraneous short circuits that drain an otherwise healthy battery. Use of the lead--calcium battery promises to reduce substantially the amount of maintenance that substation batteries need.

Timmerman, M.H.

1976-05-15T23:59:59.000Z

416

Annual Energy Outlook 2012  

Annual Energy Outlook 2012 (EIA)

U.S. Energy Information Administration | Annual Energy Outlook 2012 Energy Information Administration Annual Energy Outlook 2012 - DRAFT - June 12, 2012 1 Table B1. Total energy...

417

Annual Energy Outlook  

Annual Energy Outlook 2012 (EIA)

4) January 2004 Annual Energy Outlook 2004 With Projections to 2025 January 2004 For Further Information . . . The Annual Energy Outlook 2004 (AEO2004) was prepared by the Energy...

418

Annual Coal Distribution Report  

Gasoline and Diesel Fuel Update (EIA)

Annual Coal Distribution Report Release Date: December 19, 2013 | Next Release Date: November 2014 | full report | RevisionCorrection Revision to the Annual Coal Distribution...

419

2007 TEPP Annual Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Report United States Department of Energy Transportation Emergency Preparedness Program 1 Transportation Emergency Preparedness Program 2007 Annual Report US Department of...

420

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

2018 Levelized Costs AEO 2013 1 2018 Levelized Costs AEO 2013 1 January 2013 Levelized Cost of New Generation Resources in the Annual Energy Outlook 2013 This paper presents average levelized costs for generating technologies that are brought on line in 2018 1 as represented in the National Energy Modeling System (NEMS) for the Annual Energy Outlook 2013 (AEO2013) Early Release Reference case. 2 Both national values and the minimum and maximum values across the 22 U.S. regions of the NEMS electricity market module are presented. Levelized cost is often cited as a convenient summary measure of the overall competiveness of different generating technologies. It represents the per-kilowatthour cost (in real dollars) of building and operating a generating plant over an assumed financial life and duty cycle. Key

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Optimization of Transmission Line Design Using Life Cycle Costing  

Science Conference Proceedings (OSTI)

When an overhead line is designed, all costs incurred during the expected life of the line should be considered. The total cost during the life or life-cycle cost of a transmission line is a combination of the initial capital cost, operation and maintenance (O&M) cost, cost of electrical losses over its entire life, and dependability associated costs. The option that has the lowest life-cycle cost is selected as the optimized design. A tool is required by utility engineers to help them readily select an ...

2009-12-22T23:59:59.000Z

422

Optimization of Transmission Line Design Using Life-Cycle Costing  

Science Conference Proceedings (OSTI)

When an overhead line is designed, all costs incurred during the expected life of the line should be considered. The total cost during the life, or life-cycle cost, of a transmission line is a combination of the initial capital cost, operation and maintenance (O&M) cost, cost of electrical losses over its entire life, and dependability-associated costs. The option that has the lowest life-cycle cost is selected as the optimized design. A tool is required by utility engineers to help them readily select a...

2008-12-09T23:59:59.000Z

423

OMB Circular A-21: Direct Charging Practices Major Types of Costs  

E-Print Network (OSTI)

are those costs that can be identified specifically with a particular sponsored project or that can costs · Human subject payments · Repair & maintenance costs for equipment used for the project · Travel and specifically with a particular sponsored project. (These costs were previously known as indirect costs.). Do

Yamamoto, Keith

424

Petroleum Marketing Annual 2008  

Gasoline and Diesel Fuel Update (EIA)

8 8 Released: August 27, 2009 Petroleum Marketing Annual --- Full report in PDF (1.2 MB) Summary Statistics Summary Statistics Tables PDF 1 Crude Oil Prices PDF TXT 1A Refiner Acquisition Cost of Crude Oil by PAD Districts PDF TXT 2 U.S. Refiner Prices of Petroleum Products to End Users PDF TXT 3 U.S. Refiner Volumes of Petroleum Products to End Users PDF TXT 4 U.S. Refiner Prices of Petroleum Products for Resale PDF TXT 5 U.S. Refiner Volumes of Petroleum Products for Resale PDF TXT 6 U.S. Refiner Motor Gasoline Prices by Grade and Sales Type PDF TXT 7 U.S. Refiner Motor Gasoline Volumes by Grade and Sales Type PDF TXT 8 U.S. Refiner Conventional Motor Gasoline Prices by Grade and Sales Type PDF TXT 9 U.S. Refiner Conventional Motor Gasoline Volumes by Grade and Sales Type PDF TXT

425

Petroleum Marketing Annual 2009  

Gasoline and Diesel Fuel Update (EIA)

Released: August 6, 2010 Released: August 6, 2010 Notice: Price data for petroleum products will be changed from cents per gallon to dollars per gallon later this year for the 2010 data. Petroleum Marketing Annual --- Full report in PDF (1.2 MB) Summary Statistics Summary Statistics Tables PDF 1 Crude Oil Prices PDF TXT 1A Refiner Acquisition Cost of Crude Oil by PAD Districts PDF TXT 2 U.S. Refiner Prices of Petroleum Products to End Users PDF TXT 3 U.S. Refiner Volumes of Petroleum Products to End Users PDF TXT 4 U.S. Refiner Prices of Petroleum Products for Resale PDF TXT 5 U.S. Refiner Volumes of Petroleum Products for Resale PDF TXT 6 U.S. Refiner Motor Gasoline Prices by Grade and Sales Type PDF TXT 7 U.S. Refiner Motor Gasoline Volumes by Grade and Sales Type PDF TXT

426

Petroleum Marketing Annual 2007  

Gasoline and Diesel Fuel Update (EIA)

7 7 Released: August 29, 2008 Petroleum Marketing Annual --- Full report in PDF (1.2 MB) Summary Statistics Summary Statistics Tables PDF 1 Crude Oil Prices PDF TXT 1A Refiner Acquisition Cost of Crude Oil by PAD Districts PDF TXT 2 U.S. Refiner Prices of Petroleum Products to End Users PDF TXT 3 U.S. Refiner Volumes of Petroleum Products to End Users PDF TXT 4 U.S. Refiner Prices of Petroleum Products for Resale PDF TXT 5 U.S. Refiner Volumes of Petroleum Products for Resale PDF TXT 6 U.S. Refiner Motor Gasoline Prices by Grade and Sales Type PDF TXT 7 U.S. Refiner Motor Gasoline Volumes by Grade and Sales Type PDF TXT 8 U.S. Refiner Conventional Motor Gasoline Prices by Grade and Sales Type PDF TXT 9 U.S. Refiner Conventional Motor Gasoline Volumes by Grade and Sales Type PDF TXT

427

C:\ANNUAL\Vol2chps.v8\ANNUAL2.VP  

Gasoline and Diesel Fuel Update (EIA)

6 6 Energy Information Administration / Historical Natural Gas Annual 1930 Through 2000 Energy Information Administration / Historical Natural Gas Annual 1930 Through 2000 38. Average Consumption and Annual Cost of Natural Gas per Consumer by State, 1967-1989 Table State Residential Commercial Industrial Consumption (thousand cubic feet) Cost (dollars) Consumption (thousand cubic feet) Cost (dollars) Consumption (thousand cubic feet) Cost (dollars) 1967 Alabama ...................... 91 103 844 475 NA NA Alaska.......................... 218 329 1,361 1,348 NA NA Arizona ........................ 69 67 667 338 NA NA Arkansas ..................... 152 108 751 374 NA NA California ..................... 98 91 548 372 NA NA Colorado...................... 159 106 701 389 NA NA Connecticut ................. 73 134 312 476 NA NA DC............................... a a a

428

STANDARDEIGHT PHYSICALANDTECHNOLOGICALRESOURCES  

E-Print Network (OSTI)

. INTRODUCTION Historically, maintenance has been perceived as a ``neces- sary evil,'' an inevitable cost burden (training, travel, checkout, materials); (6) annual maintenance costs; and (7) overall equipment ef maintenance capability Visual indicators Overall equipment effectiveness Mean time to repair Annual

Shumway, Scott W.

429

Nuclear Maintenance Applications Center: Main Feedwater Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Loss of a main feedwater pump can have severe economic impact on a nuclear utility. The majority of forced outages or power reductions are believed to be attributed to nondesign issues. Case leaks, excessive vibration, seal leaks, and lubrication system problems are shown to significantly impact feedwater pump availability. Improved maintenance practices and increased attention to these issues are critical for realizing longevity of main feedwater ...

2012-11-14T23:59:59.000Z

430

Nuclear Maintenance Applications Center: Maintenance Work Package Planning Guidance  

Science Conference Proceedings (OSTI)

The work management process is one of the core business processes outlined within the Nuclear Energy Institute (NEI) Standard Nuclear Performance Model for operation and maintenance of nuclear power plants. The preparation of work packages is a key element of this overall process. The purpose of this report is to provide guidance to power plant personnel regarding work package quality as a supplement to Institute of Nuclear Power Operations (INPO) AP-928, Work Management Process Description. The ...

2013-09-10T23:59:59.000Z

431

Design Study and Cost Estimate for an Assurred Isolation Facility in Texas  

SciTech Connect

The optimized assured isolation facility (AIF) consists of waste shipping containers being placed inside steel-reinforced concrete overpacks, which are, in turn, placed in steel-reinforced concrete vaults without an earthen cover system. The concrete vaults are designed to remain in service for hundreds of years, with the aid of ongoing active maintenance. This will be required since the facility will remain under license as long as waste is present in the facility. The estimated present value of life-cycle costs total about $318 million. Of this amount, over 30 percent is attributable to the need to accumulate the financial assurance fund which allows future management options to be implemented. The charge for waste received at the AIF in order to recover all costs and ensure proper facility function following the waste acceptance period was calculated for each year of AIF operation, considering annual variations in the volume received and the costs that must be recovered. The present value of the AID unit charges range for $84 to $420 per cubic foot with a life-cycle average of about $177 per cubic foot. When making decisions on cost factors and comparing alternatives, the lifetime average of $177 per cubic foot is most meaningful.

Baird, R. D.; Rogers, B. C.; Chau, N.; Kerr, Thomas A

1999-08-01T23:59:59.000Z

432

Solar Water Heating with Low-Cost Plastic Systems (Brochure)  

DOE Green Energy (OSTI)

Newly developed solar water heating technology can help Federal agencies cost effectively meet the EISA requirements for solar water heating in new construction and major renovations. This document provides design considerations, application, economics, and maintenance information and resources.

Not Available

2012-01-01T23:59:59.000Z

433

Economic and Financial Costs of Saving Water and Energy: Preliminary Analysis for Hidalgo County Irrigation District No. 2 (San Juan) – Replacement of Pipeline Units I-7A, I-18, and I-22  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a three-component capital renovation project proposed by Hidalgo County Irrigation District No. 2. The proposed project primarily consists of replacing aged mortar-joint pipe in pipeline units I-7A, I-18, and I-22 with new rubber-gasketed, reinforced concrete pipe. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for the cost of saving water are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 485 ac-ft of water per year and 179,486,553 BTUs {52,604 kwh} of energy per year. The calculated economic and financial cost-of-saving water is estimated to be $385.46 per ac-ft. The calculated economic and financial cost-of-saving energy is estimated to be $0.0010735 per BTU {$3.663 per kwh}. In addition, expected real (vs. nominal) values are provided for the U.S. Bureau of Reclamation’s three principal evaluation measures specified in U.S. Public Law 106-576. The aggregate initial construction cost per ac-ft of water saved measure is $510.92. The aggregate initial construction cost per unit of energy saved measure is $0.0013798 per BTU {$4.708 per kwh}. The aggregate ratio of initial construction costs per dollar of total annual economic savings is estimated to be -2.53.

Sturdivant, Allen W.; Rister, M. Edward; Lacewell, Ronald D.

2007-06-01T23:59:59.000Z

434

Assessment of light water reactor power plant cost and ultra-acceleration depreciation financing  

E-Print Network (OSTI)

Although in many regions of the U.S. the least expensive electricity is generated from light-water reactor (LWR) plants, the fixed (capital plus operation and maintenance) cost has increased to the level where the cost ...

El-Magboub, Sadek Abdulhafid.

435

LNG Annual Report - 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Report - 2012 LNG Annual Report - 2012 LNG Annual Report - 2012 (Revised 3212013) LNG Annual Report - 2012...

436

Draft 2013 Annual Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft 2013 Annual Plan Draft 2013 Annual Plan Section 999: Draft 2013 Annual Plan Section 999 - Draft 2013 Annual Plan...

437

Aluminum: Improved System Yields $100,000 Annual Savings  

SciTech Connect

In another Office of Industrial Technologies Motor Challenge Success Story, Alcoa (formerly Alumax) aluminum reduced annual energy consumption by 12% and reduced both maintenance and noise levels. Order this fact sheet now to learn how your company can both increase energy efficiency and decrease pollution.

Ericksen, E.

1999-01-29T23:59:59.000Z

438

Wind Turbine Lubrication Maintenance Guide  

Science Conference Proceedings (OSTI)

With the rush to develop todays massive wind energy sites, more attention should be paid to the inevitable need to perform routine maintenance and develop practical means of assessing the condition of the components within the nacelles and other outside support equipment for the wind farms. Current operating models have not adequately established accurate assumptions or expectations on the unavailability of the windmills and the impact on lost generation. Contracts for purchase of their generation output...

2012-06-20T23:59:59.000Z

439

Computerized Maintenance Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

440

Electric Motor Predictive Maintenance: Draft Guidelines  

Science Conference Proceedings (OSTI)

Predictive Maintenance can enhance the early detection and avoidance of incipient equipment failures in electric motors. This report provides draft guidelines to support the development of electric motor predictive maintenance (EMPM) programs at utility sites.

1997-10-16T23:59:59.000Z

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

African Easterly Jet: Structure and Maintenance  

Science Conference Proceedings (OSTI)

This article investigates the African easterly jet (AEJ), its structure, and the forcings contributing to its maintenance, critically revisiting previous work that attributed the maintenance of the jet to soil moisture gradients over tropical ...

Man-Li C. Wu; Oreste Reale; Siegfried D. Schubert; Max J. Suarez; Randy D. Koster; Philip J. Pegion

2009-09-01T23:59:59.000Z

442

A quality assurance program for software maintenance  

Science Conference Proceedings (OSTI)

This paper presents the description of a quality assurance (QA) program applied to software maintenance projects. The QA program is a set of checks or inspections overlaid on the steps of the maintenance project. The relationship between the QA program ...

John W. Center

1982-06-01T23:59:59.000Z

443

Improving maintenance operation through transformational outsourcing  

E-Print Network (OSTI)

Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

Ye, Jacqueline Ming-Shih

2007-01-01T23:59:59.000Z

444

EPRI Maintenance Excellence Matrix Revision Status  

Science Conference Proceedings (OSTI)

This report documents the progress in revising the Electric Power Research Institute EPRI 2002 Report 1004705, Maintenance Excellence Matrix Assessment Guideline for Fossil Power Plants, which provides utilities a comprehensive self-assessment guideline for improving maintenance processes.

2008-12-23T23:59:59.000Z

445

Development of a low-cost integrated 20-kW ac solar tracking sub- array for grid-connected PV power system applications. Phase 1, Annual technical report, 11 July 1995--31 July 1996  

DOE Green Energy (OSTI)

The overall goal of this effort is to reduce the installed cost of utility scale grid connected photovoltaic power systems. The focus of the effort is on ``BOS`` (Balance-Of-System) component manufacturing technology, which essentially involves all PV power system engineering, manufacturing, assembly and construction tasks from the receipt of a PV module to the deliver of grid connected electricity.

Stern, M.; West, R.; Fourer, G.; Whalen, W.; Van Loo, M.; Duran, G. [Utility Power Group, Chatsworth, CA (United States)

1997-06-01T23:59:59.000Z

446

Categorical Exclusion for Maintenance Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

447

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

icon Twitter icon Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary Name: Africa's Transport Infrastructure...

448

The impact of maintenance and rehabilitation strategies on the pavement network value  

E-Print Network (OSTI)

The maintenance and rehabilitation of road infrastructure demands a great investment of time and money. The deterioration of pavement condition over time due to environmental factors and increasing traffic loads combined with the limitation of funds available for maintenance and rehabilitation creates a complex problem faced during the fund allocation process. Combinations of alternate funding levels and pavement management policies create different impacts on the network condition and future funding needs. The impacts of such decisions are one of the main concerns at strategic management levels where decisions about pavement maintenance and rehabilitation policies and funding levels are made. Pavement management systems have been used since about 1970 to assist in selecting candidate sections for treatment and identifying cost-effective treatments. Some engineering and economic models compare different maintenance and rehabilitation alternatives considering user costs, including vehicle operating costs, time of travel, and frequency of accidents; as well as agency costs, including maintenance and rehabilitation costs. User benefits are calculated by subtracting the user costs for a given strategy from the user costs from a do nothing strategy. However, these benefits do not necessarily translate into funds available to the agency. An asset management approach to assess the impact of pavement maintenance and rehabilitation scenarios on the pavement network value is presented in this research, and a case study is developed to evaluate the applicability of the method. This approach considers the effects of pavement maintenance and rehabilitation scenarios on the pavement network value in terms of the agency costs needed to recover the value of the asset. Methods for the quantifying the pavement network value over time, estimating agency costs, and analyzing the results are discussed. Results from a case study indicate that the method is able to assess the impact of pavement maintenance and rehabilitation strategies. This approach shows that there is an increase in the agency costs when treatments are delayed due to budget constraints or ineffective agency policies. Guidelines to report the impact of pavement management strategies are also outlined.

Chang Albitres, Carlos Martin

1999-01-01T23:59:59.000Z

449

Treatment Resin Reduces Costs, Materials in Hanford Groundwater Cleanup -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Treatment Resin Reduces Costs, Materials in Hanford Groundwater Treatment Resin Reduces Costs, Materials in Hanford Groundwater Cleanup - Efficiency delivered more than $6 million in cost savings, $3 million in annual savings Treatment Resin Reduces Costs, Materials in Hanford Groundwater Cleanup - Efficiency delivered more than $6 million in cost savings, $3 million in annual savings June 4, 2013 - 12:00pm Addthis Media Contacts Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov (509) 376-4171 Dee Millikin, CHPRC Dee_Millikin@rl.gov (509) 376-1297 RICHLAND, Wash. - U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company is using a treatment material that has delivered more than $6 million in cost savings to date and is delivering more than $3 million in annual cost savings and efficiencies in treatment

450

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining the equipment for reclamation? Types of Costs #12;· Marginal Cost: ­ Change in total cost ­ Any production process involves fixed and variable costs. As production increases/expands, fixed costs are unchanged, so

Boisvert, Jeff

451

A Total Cost of Ownership Model for Design and Manufacturing Optimization of Fuel Cells in Stationary and Emerging Market Applications - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Max Wei (Primary Contact), Tom McKone, Tim Lipman 1 , David Dornfeld 2 , Josh Chien 2 , Chris Marnay, Adam Weber, Paul Beattie 3 , Patricia Chong 3 Lawrence Berkeley National Laboratory (LBNL) 1 Cyclotron Road MS 90R-4000 Berkeley, CA 94706 Phone: (510) 486-5220 Email: mwei@lbl.gov DOE Manager HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov Subcontractors: 1 University of California, Berkeley, Transportation Sustainability Research Center and DOE Pacific Region Clean Energy Application Center, Berkeley, CA 2 University of California, Berkeley, Laboratory for Manufacturing and Sustainability, Department of Mechanical Engineering, Berkeley, CA

452

Knowledge-Projection for Tele-Maintenance  

E-Print Network (OSTI)

-to-end system fault diagnosis and repair ­ Opening up opportunities to streamline the maintenance process Demo Data Mining GUI Query & Browse Facility System Trainer · Maintenance Procedures · Session Capture Navigator Query Engine Query Processing & Knowledge Retrieval Process Engine Dynamic Maintenance Management

Tu, Yicheng

453

Electrohydraulic Control (EHC) Fluid Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Electrohydraulic Control (EHC) Fluid Maintenance Guide" provides plant personnel with information on the operation, maintenance, and performance of the electrohydraulic control (EHC) system. The contents of this guide will aid plant workers in improving EHC system reliability, performance, and plant maintenance practices.

2002-12-29T23:59:59.000Z

454

SCAMP Code -- Strategic Capacity Axial-Compressor Maintenance Program, Version 2.00  

Science Conference Proceedings (OSTI)

The Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) spreadsheet provides combustion turbine operators with a low-cost, easy-to-install, easy-to-use program for monitoring combustion turbine axial compressor and overall turbine performance. It can be used to diagnose the condition of axial compressors and to determine the benefits of maintenance actions such as an off-line compressor wash. Important features of the SCAMP spreadsheet include the following: o Operates as a spreadsheet with m...

2000-12-12T23:59:59.000Z

455

PRE-SW Strategic Capacity Axial Compressor Maintenance Program (SCAMP) Version 3.0, Beta  

Science Conference Proceedings (OSTI)

The Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) spreadsheet provides combustion turbine operators with a low-cost, easy-to-install, easy-to-use program for monitoring combustion turbine axial compressor and overall turbine performance.  It can be used to diagnose the condition of axial compressors and to determine the benefits of maintenance actions such as an off-line compressor wash.Benefits & ...

2012-09-23T23:59:59.000Z

456

2010 Annual Planning Summary for Nevada Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Nevada Site Office More Documents &...

457

2010 Annual Planning Summary Livermore Site Office (LSO) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary Livermore Site Office (LSO) More Documents...

458

2010 Annual Planning Summary for Kansas City Site Office (KCSO...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Kansas City Site Office (KCSO) More...

459

2010 Annual Planning Summary for Los Alamos Site Office (LASO...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Los Alamos Site Office (LASO) More...

460

2010 Annual Planning Summary for Richland Operations Office ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Richland Operations Office (RL) More...

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

2011 Annual Planning Summary for Argonne Site Office (Argonne...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2011 Annual Planning Summary for Argonne Site Office (ArSO) More...

462

2011 Annual Planning Summary for Pacific Northwest Site Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2011 Annual Planning Summary for Pacific Northwest Site Office (PNSO)...

463

2010 Annual Planning Summary for Idaho Operations Office (ID...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Idaho Operations Office (ID) More...

464

2010 Annual Planning Summary for Savannah River Operations Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Savannah River Operations Office (SRS)...

465

Cask system maintenance in the Federal Waste Management System  

SciTech Connect

In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, green-field'' facility for maintaining the Federal Waste Management System (FWMS) casks. This study provided and initial layout facility design, an estimate of the construction costs, and an acquisition schedule for a Cask Maintenance Facility (CMF). It also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs derived from the study have been organized for use in the total transportation system decision-making process. Most importantly, they also provide a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone, green-field'' configuration. This design approach provides a comprehensive design evaluation, to guide the development of a cost estimate and to permit flexibility in locating the facility. The following sections provide background information on cask system maintenance, briefly summarizes some of the functional requirements that a CMF must satisfy, provides a physical description of the CMF, briefly discusses the cost and schedule estimates and then reviews the findings of the efforts undertaken since the feasibility study was completed. 15 refs., 3 figs.

Pope, R.B.; Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

466

Robust Maintenance Policies for Markovian Systems under Model Uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

467

Robust maintenance policies for Markovian systems under model uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, K D; Madanat, S M

2006-01-01T23:59:59.000Z

468

WSDOT highway maintenance: environmental compliance for protected terrestrial species  

E-Print Network (OSTI)

in figure 3. Maintenance Activity Best Management PracticesOlympic Region Maintenance Program on management recommen-If a maintenance activity is not exempt, Best Management

O’Brien, Tracie; Carey, Marion; Forrester, Bret

2005-01-01T23:59:59.000Z

469

Human Factors/Ergonomics Handbook for the Design for Ease of Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 2.0 DESIGN FOR MAINTAINABILITY This section contains human factors guidance for designing systems, subsystems, equipment and facilities so that maintenance is easy and cost effective. 2.1 Unitization, modularization, and standardization Unitization refers to separating equipment into physically and functionally distinct units to allow for easy removal and replacement. This type of equipment separation will permit division of maintenance responsibility, especially troubleshooting, among various maintenance levels. Modularization refers to unitized equipment in which the functional units making up a module are integrated and are removed or inserted as a unit. 2.1.1 Goals of unitization/modularization. Unit design/modularization of equipment should

470

DOE/IG Annual Performance Report FY 2008, Annual Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Report FY 2008, Annual Performance Plan FY 2009 More Documents & Publications Office Inspector General DOE Annual Performance Report FY 2008, Annual Performance Plan FY...

471

Table 30. Landed Costs of Imported Crude Oil for Selected Crude...  

Annual Energy Outlook 2012 (EIA)

Energy Information Administration Petroleum Marketing Annual 1995 53 Table 30. Landed Costs of Imported Crude Oil for Selected Crude Streams (Dollars per Barrel) - Continued...

472

Table 30. Landed Costs of Imported Crude Oil for Selected Crude...  

Annual Energy Outlook 2012 (EIA)

Energy Information AdministrationPetroleum Marketing Annual 1998 53 Table 30. Landed Costs of Imported Crude Oil for Selected Crude Streams (Dollars per Barrel) - Continued...

473

Table 30. Landed Costs of Imported Crude Oil for Selected Crude...  

Annual Energy Outlook 2012 (EIA)

Energy Information AdministrationPetroleum Marketing Annual 1999 53 Table 30. Landed Costs of Imported Crude Oil for Selected Crude Streams (Dollars per Barrel) - Continued...

474

Trends in the cost of efficiency for appliances and consumer electronics  

E-Print Network (OSTI)

and costs, and includes projections of annual shipments,calibrate future shipment projections in the NIA. Figure 1the default price trend projection. The resulting experience

Desroches, Louis-Benoit

2013-01-01T23:59:59.000Z

475

ArkansasEnergy and Cost Savings for New Single- and Multifamily...  

NLE Websites -- All DOE Office Websites (Extended Search)

Table A.11 shows the estimated annual energy costs, including heating, cooling, water heating, and lighting per home that result from meeting the requirements in the 2006,...

476

Introduction to production cost models 1.0 Introduction  

E-Print Network (OSTI)

(t) is total maintenance costs in year t. · O(t) is the cost associated with outages. and the overbar in (1 · I(t) is total investment costs at year t · S(t) is total salvage value of retired plants at year t (and for all plants still in operation at year T). · F(t) is total fuel costs in year t. · M

McCalley, James D.

477

ONTOCOM: A Cost Estimation Model for Ontology Engineering  

E-Print Network (OSTI)

Abstract: This paper introduces ONTOCOM, a parametric cost estimation model for Semantic Web ontologies. After analyzing established, general-purpose cost estimation methodologies we propose a methodology, which can be applied to develop cost models for ontology engineering. We examine the particularities of this engineering field on the basis of the proposed methodology, in order to identify cost factors which influence the effort invested in ontology building, reuse and maintenance. 1

Elena Paslaru Bontas; Malgorzata Mochol; Freie Universität

2006-01-01T23:59:59.000Z

478

Costs of Urban Stormwater Control Practices Arvind Narayanan  

E-Print Network (OSTI)

. The life-cycle project costs include the initial construction costs, in addition to long- term maintenance)......................................................................................................................76 Table 64. Estimated Capital Cost of a 1.5-foot Deep, 10-feet Wide, 1,000-feet Long Grass Swale (SEWRPC)......................................................................................................................78 Table 65. Estimated Capital Cost of a 3.0-feet Deep, 21-feet Wide, 1,000-feet Long Grass Swale (SEWRPC

Pitt, Robert E.

479

International Association of Hydrogeologists (Irish Group) 23rd Annual Meeting  

E-Print Network (OSTI)

, implementation costs, long-term maintenance requirements, and life-cycle costs. The most promising and best urban hydrological cycle. These combinations of unit processes, termed treatment trains, can be applied understood stormwater control practices are wet detention ponds. Less reliable in terms of predicting

Pitt, Robert E.

480

OHA 2011 ANNUAL REPORT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ANNUAL REPORT 1 ANNUAL REPORT OHA 2011 ANNUAL REPORT Report on the FY 2011 operations of the Office of Hearings and Appeals (OHA). Here are highlights for the past year: Alternative DisputeResolution. In FY 2011, we were happy to welcome aboard the DOE's Office of Conflict Resolution and Prevention (OCPR), which joined OHA in February 2011. OCPR, formerly a part of the Office of General Counsel, serves as a resource to all DOE components and contractors to explore efficient and cost effective means of preventing conflicts and resolving disputes, without the formalities or costs of litigation. Personnel security hearings. Under DOE's personnel security program, OHA conducts administrative hearings concerning individuals' eligibility for access to classified information or special nuclear material. In FY

Note: This page contains sample records for the topic "annual maintenance cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

2011 Cost of Wind Energy Review  

SciTech Connect

This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A.; Schwabe, P.

2013-03-01T23:59:59.000Z

482

2011 Cost of Wind Energy Review  

DOE Green Energy (OSTI)

This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A.; Schwabe, P.

2013-03-01T23:59:59.000Z

483

Annual Course Review Checklist  

NLE Websites -- All DOE Office Websites (Extended Search)

6_Course Maintenance Review Checklist 11_0329 6_Course Maintenance Review Checklist 11_0329 1 of 6 EOTA - Business Form Document Title: Course Maintenance Review Checklist Document Number: ISDF-016 11_0329 Document Owner: Vickie Pleau Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-003 Notify of Changes: ISD, QAM, ITT, MGT Referenced Document(s): QAMP-002 Project/Course Maintenance Process ISDF-016_Course Maintenance Review Checklist 11_0329 2 of 6 Revision History: Rev. Description of Change A Initial Release 11_0329 Completely revamped checklist. ISDF-016_Course Maintenance Review Checklist 11_0329 3 of 6 ISDF-016 Course Maintenance Review Checklist YES NO N/A Put dashes is column when not to be used 1.0 GENERAL 1.1 Course Number/Length:

484

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

U520038836 Advanced Vehicle Testing Activity Date Mileage Description Cost 8-Aug 11,142 Oil change 35.44 11-Oct 14,133 Rear Bumper damaged in collision (not included in...

485

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Description Cost 272002 8,668 Oil change 50.17 522002 12,898 Driver ran over debris on road causing foreign object damage to front coolers. Coolers replaced. (not...

486

TOWARDS A MAINTENANCE SEMANTIC ARCHITECTURE Mohamed Hedi Karraya  

E-Print Network (OSTI)

packages (Computerized Maintenance Management System). The daily events of maintenance were treated a complex information system for maintenance management [9]. The project aimed to develop a collaborative including the existing systems of data acquisition, control, maintenance management, diagnosis assistance

Paris-Sud XI, Université de

487

The Cost of Heat Exchanger Fouling in the U. S. Industries  

E-Print Network (OSTI)

Fouling of heat exchangers costs the U.S. industries hundreds of millions of dollars every year in increased equipment costs, maintenance costs, energy losses and losses in production. The designer of heat exchangers usually allows for fouling by using a fouling factor in the design which results in additional capital cost of the heat exchanger. As fouling deposits build up in a heat exchanger, its performance will start to deteriorate and less energy will be transferred through the unit. A plot is provided that gives the percent decrease in heat flux, for a constant driving temperature difference, as a function of the clean overall heat transfer coefficient and the fouling factor. Another plot gives the increase in surface area due to fouling for the same heat transfer rate and driving temperature difference, as a function of the clean overall heat transfer coefficient and the fouling factor. The overall heat transfer market was divided into four sectors: the chemical, petroleum, electric utility and other industries. The 1982 U.S. sales of all industrial heat exchangers, excepting boilers and automotive radiators, was about 285,000 units amounting to about $1.6 billion. The total heat duty of all the heat exchangers in industrial operation, including electric utilities, was estimated at 11.7 Quads. If this represented the amount of heat transferred through clean heat exchangers, the decrease in energy transferred due to fouling or the cost of fouling in terms of energy lost was estimated at 2.9 Quads annually. The cost of fouling, in providing for additional surface area to compensate for a decrease in heat transfer, was conservatively estimated at $180 million in 1982.

Rebello, W. J.; Richlen, S. L.; Childs, F.

1988-09-01T23:59:59.000Z

488

IEA Wind Task 26 - Multi-national Case Study of the Financial...  

Open Energy Info (EERE)

of components including the investment cost, operation and maintenance costs, financing costs, and annual energy production. Accurate representation of these cost streams is...

489

INTOR critical issue D: maintainability. Tritium containment and personnel access vs remote maintenance, Chapter VI of the US INTOR report for Phase Two A, Part 2  

SciTech Connect

The purpose of this study is to compare the benefits and costs associated with personnel access mmaintenance procedures compared to those of all-remote maintenance procedures. The INTOR Phase Two A, Part I configuration was used to make this comparison. For both approaches, capital and operating costs were considered to first order, maintenance equipment requirements were investigated, maintenance requirements common to both approaches and unique to each were identified, tritium handling requirements were outlined, and maintenance scenarios and device downtime were developed for both. In addition, estimates of person-rem exposure were made for the personnel access approach.

Spampinato, P.T.; Finn, P.A.; Gohar, Y.; Yang, S.T.; Stasko, R.R.; Morrison, C.; Russell, S.; Shaw, G.; Bussell, G.T.; Watts, R.

1984-01-01T23:59:59.000Z

490

2012 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Food Structure presented at the 103rd AOCS Annual Meeting. 2012 Annual Meeting Abstacts Topics/ Subject Matter aocs book books cdrom cdroms course echapters fats lipid methods oils press Food Science acid agricultural analysis anal

491

2011 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Food Structure presented at the 102nd AOCS Annual Meeting. 2011 Annual Meeting Abstacts Topics/ Subject Matter aocs book books cdrom cdroms course echapters fats lipid methods oils press Food Science acid agricultural analysis anal

492

2011 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Protein and Co-Products presented at the 102nd AOCS Annual Meeting. 2011 Annual Meeting Abstacts Protein and Co-Products agricultural analytical aocs articles biotechnology courses detergents Detoxification and deallergenation division div

493

2010 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Biotechnology presented at the 101st AOCS Annual Meeting. 2010 Annual Meeting Abstacts Biotechnology articles biotech Biotechnology biotransformation cloning detergents division divisions edible food genetics journal lipids methods molecul

494

2006 TEPP Annual Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Emergency Preparedness Program 2006 Annual Report US Department of Energy - Offi ce of Environmental Management Transportation Emergency Preparedness Program 2006 Annual Report 2 2 Table of Contents Executive Summary.......................................................................................................................4 I. Transportation Emergency Preparedness Program Purpose.......................................6

495

2011 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Analytical presented at the 102nd AOCS Annual Meeting. 2011 Annual Meeting Abstacts Analytical Chemistry acid analysis Analytical Chemistry aocs applicants april articles atomic)FluorometryDifferential scanning calorimetry chemist chemistr

496

2009 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Edible Applications Technology presented at the 100th AOCS Annual Meeting. 2009 Annual Meeting Abstacts Topics/ Subject Matter aocs book books cdrom cdroms course echapters fats lipid methods oils press Food Science acid agricultur

497

2012 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Sterols presented at the 103rd AOCS Annual Meeting. 2012 Annual Meeting Abstacts Topics/ Subject Matter aocs book books cdrom cdroms course echapters fats lipid methods oils press Meetings, Conferences and Short Courses aocs

498

2011 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Health and Nutrition presented at the 102ndrd AOCS Annual Meeting. 2011 Annual Meeting Abstacts Health acid analysis aocs april articles chloropropanediol contaminants detergents dietary fats division divisions esters fats fatty food foods

499

2009 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Phospholipids presented at the 100th AOCS Annual Meeting. 2009 Annual Meeting Abstacts Phospholipid agricultural analytical aocs articles biotechnology courses detergents division divisions emulsification systems fats industrial industries

500

2011 Annual Meeting Abstacts  

Science Conference Proceedings (OSTI)

Abstracts from Surfactants and Detergents presented at the 102nd AOCS Annual Meeting. 2011 Annual Meeting Abstacts Surfactants and Detergents aocs articles Detergents division divisions fabric fats home care jaocs journal jsd laundry methods oils papers