Sample records for annual maintenance cost

  1. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  2. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  3. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... No Data U.S. Department of Energy Annual Report of Site Surveillance and Maintenance ... standard of 10 mgL. Location GS13 clearly shows the effects of the former Solar Ponds. ...

  4. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... of Energy Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site-CY 2015 April 2016 Doc. No. S13696 Page 27 The inverter for the solar power ...

  5. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ...second ft feet ftyr feet per year SEP Solar Evaporation Pond WL water level yr years U.S. Department of Energy Annual Report of Site Surveillance and Maintenance ...

  6. Estimated Maintenance Cost Savings from a Geothermal Heat Pump...

    Office of Scientific and Technical Information (OSTI)

    Contract at Fort Polk, LA Citation Details In-Document Search Title: Estimated Maintenance Cost Savings from a Geothermal Heat Pump Energy Savings Performance Contract at ...

  7. Update on maintenance and service costs of commercial building ground-source heat pump systems

    SciTech Connect (OSTI)

    Cane, D.; Garnet, J.M.

    2000-07-01

    An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

  8. Steam trap maintenance management saves $180,000 annually

    SciTech Connect (OSTI)

    Franks, F.C.; Wickersham, C.

    1985-12-01

    The Reichhold Chemical plant is located in Elizabeth, NJ. At this location, the cost of steam had skyrocketed to $5.30 per million Btu. The plant has 600 steam traps manufactured by ten different companies. Some 17 different models of traps are used with 33 piping configurations. There are five different operating pressures throughout the plant ranging from 15-175 psig, including 30, 65, and 120 psig. Five different applications of steam usage can be broken down as follows: steam tracing (56%); drip (21%); comfort heating (18%); tank coil (4%); and process (1%). In the fall of 1983, the annual yearly inspection of steam traps was supplanted with an independent trap survey service, specializing in detecting the malfunctioning of various types of steam traps. The basic program included location and tagging of all steam traps; survey and inspection of steam trap population; development of a trap map; and full computer analysis of collected data. It was determined that approximately 3919 lb/hr of steam could be saved by repairing the failed open traps and implementing the report's recommendations. There were also benefits from fixing the failed closed traps which were out of service at the time of the survey. These traps do not allow the flow of steam or condensate to pass through the orifice. This condition causes condensate to back up and reduce efficiency. The maintenance management has been pleased with the results and recommendations of the program. It has provided them with a complete inventory and status report of the 600 traps plantwide. It saved $180,000 over the previous year in energy expenditures. This was the most important contribution in lowering the plant energy costs.

  9. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect (OSTI)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  10. "Table 2. Real Average Annual Coal Transportation Costs, By Primary...

    U.S. Energy Information Administration (EIA) Indexed Site

    Real Average Annual Coal Transportation Costs, By Primary Transport Mode and Supply Region" "(2013 dollars per ton)" "Coal Supply Region",2008,2009,2010,2011,2012,2013 "Railroad"...

  11. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    .........24 2.7.3 Solar Ponds Plume Treatment System ... Maintenance Activities at the Rocky Flats Site-CY 2015 U.S. Department of Energy Doc. No. ...

  12. Estimated Maintenance Cost Savings from a Geothermal Heat Pump Energy Savings Performance Contract at Fort Polk, LA

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  13. Estimated maintenance cost savings from a geothermal heat pump energy savings performance contract at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.

    1997-12-31

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all the equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  14. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... Maintenance Activities at the Rocky Flats Site-CY 2015 U.S. Department of Energy Doc. No. ... POE Point of Evaluation; PV photovoltaic; SPPTS Solar Ponds Plume Treatment System

  15. Simple Maintenance Saves Costly Furnace Repair/Replacement

    Broader source: Energy.gov [DOE]

    For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance.

  16. Orifice-type condensate removal device reduces maintenance, energy costs

    SciTech Connect (OSTI)

    Wright, T.N.; Isaacs, M.

    1983-02-01

    In the acrylate section of the Rohm and Haas Texas plant in Deer Park, conventional steam traps were replaced by a potential orifice-type condensate removal device that has no moving parts or gaskets. Each of the devices installed resulted in a saving of an estimated $2000/year by eliminating the maintenance required on the original steam traps.

  17. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    SciTech Connect (OSTI)

    Kalispel Tribe, Department of Natural Resources

    1998-01-01

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  18. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    SciTech Connect (OSTI)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  19. Modeling the reliability and maintenance costs of wind turbines using Weibull analysis

    SciTech Connect (OSTI)

    Vachon, W.A.

    1996-12-31

    A general description is provided of the basic mathematics and use of Weibull statistical models for modeling component failures and maintenance costs as a function of time. The applicability of the model to wind turbine components and subsystems is discussed with illustrative examples of typical component reliabilities drawn from actual field experiences. Example results indicate the dominant role of key subsystems based on a combination of their failure frequency and repair/replacement costs. The value of the model is discussed as a means of defining (1) maintenance practices, (2) areas in which to focus product improvements, (3) spare parts inventory, and (4) long-term trends in maintenance costs as an important element in project cash flow projections used by developers, investors, and lenders. 6 refs., 8 figs., 3 tabs.

  20. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    SciTech Connect (OSTI)

    Maples, B.; Saur, G.; Hand, M.; van de Pietermen, R.; Obdam, T.

    2013-07-01

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  1. Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.

    SciTech Connect (OSTI)

    Not Available

    2004-11-01

    Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a

  2. Fact #594: October 26, 2009 Fuel Economy and Annual Fuel Cost Ranges for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Classes | Department of Energy 4: October 26, 2009 Fuel Economy and Annual Fuel Cost Ranges for Vehicle Classes Fact #594: October 26, 2009 Fuel Economy and Annual Fuel Cost Ranges for Vehicle Classes The graph below shows the range of the lowest and highest fuel economy for each vehicle class, along with the lowest and highest annual fuel cost (in parentheses). For example, the two-seater model with the lowest fuel economy gets 10 miles per gallon (MPG) with an estimated annual fuel

  3. Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.

    SciTech Connect (OSTI)

    Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

    2006-03-01

    Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

  4. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document, from the U.S. Environmental Protection Agency's ENERGY STAR Residential Program, is part of the Case Study Series, highlighting how "Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs."

  5. Effect of coal quality on maintenance costs at utility plants. Final report. [Effect of ash and sulfur content of coal

    SciTech Connect (OSTI)

    Holt, E.C. Jr.

    1980-06-01

    In an attempt to determine if correlation exists between coal quality, as measured by its ash and sulfur contents, and the maintenance cost at utility plants, an examination was made of the actual maintenance cost experience of selected portions of five TVA coal-fired power plants as a function of the fuel quality consumed during an extended period of time. The results indicate that, according to our decision rules developed in compliance with accepted statistical practices, correlation does exist in many portions of the coal-fired plants for which sufficient maintenance cost records were available. The degree of correlation varies significantly among the individual portions of a particular plant as well as among the various plants. However, the indicators are sufficient to confirm that a change (within the design constraints of the unit) in the ash and/or sulfur content of the coal being consumed by a utility boiler will have a proportionate effect on the maintenance cost at the plant. In the cases examined, each percent variation in ash content could have a monetary effect of from $0.05 to $0.10 per ton of coal consumed. Similarly, each percent variation in sulfur content could influence maintenance costs from $0.30 to $0.50 per ton of coal. Since these values are based on preliminary analysis of limited data, they must be approached with caution and not removed from the context in which they are presented. However, if borne out by further study, the potential magnitude of such savings may be sufficient to justify the acquisition of superior coal supplies, either by changing the source and/or using preparation to obtain a lower ash and sulfur fuel.

  6. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality

  7. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  8. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 2000 Annual Report.

    SciTech Connect (OSTI)

    Bluff, Stanley

    2000-12-01

    No Annual Production Goals were achieved for the year. The Kalispel Hatchery experienced two episodes of brood fish mortality. The first due to a standpipe malfunction and the second attributed to gas bubble disease caused by elevated Total Dissolved Gases (TDG's) in the reservoir. To date, the hatchery has 29 brood fish in the raceway and ready to spawn. If all things go well this spring, hatchery operations should be well underway next year.

  9. Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011

    SciTech Connect (OSTI)

    Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

    2012-01-01

    DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

  10. Treatment Resin Reduces Costs, Materials in Hanford Groundwater Cleanup- Efficiency delivered more than $6 million in cost savings, $3 million in annual savings

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company is using a treatment material that has delivered more than $6 million in cost savings to date and is delivering more than $3 million in annual cost savings and efficiencies in treatment of contaminated groundwater near the Columbia River at the Hanford Site in southeast Washington state.

  11. Web Maintenance Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web ... Learn more about content analysis. Attend semi-annual Web Governance Team meetings. Twice ...

  12. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D D) Program is part of the Department of Energy (DOE) Environmental Restoration D D Program and has continued to provide surveillance and maintenance (S M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S M planning, (2) routine S M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  13. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    29 3.0 Environmental Monitoring 3.1 Water Monitoring 3.1.1 Introduction This section presents data collected to satisfy water monitoring objectives implemented at the Site in accordance with RFLMA Attachment 2, "Legacy Management Requirements," Table 2, "Water Monitoring Locations and Sampling Criteria." The RFSOG provides a guidance framework in support of conducting LM activities, including monitoring, at the Site. This annual report focuses on data collected during CY 2015

  14. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    262 Notes: Pie chart diameters are relative to total load. Figure 192. Relative Average Annual Total U Loads from Former IA Drainages and WWTP 3.1.5 Groundwater Data Interpretation and Evaluation This section provides a summary of groundwater monitoring performed in 2015. A discussion of groundwater conditions during 2015, focusing on the most important water-quality aspects in the areas of interest (i.e., the main contaminant plumes), is then presented. 3.1.5.1 RFLMA Groundwater Monitoring

  15. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    SciTech Connect (OSTI)

    Wiser, R.; Bolinger, M.

    2007-05-01

    This report--the first in what is envisioned to be an ongoing annual series--attempts to fill this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2006.

  16. Cost and quality of fuels for electric utility plants: Energy data report. 1980 annual

    SciTech Connect (OSTI)

    Not Available

    1981-06-25

    In 1980 US electric utilities reported purchasng 594 million tons of coal, 408.5 million barrels of oil and 3568.7 billion ft/sup 3/ of gas. As compared with 1979 purchases, coal rose 6.7%, oil decreased 20.9%, and gas increased for the fourth year in a row. This volume presents tabulated and graphic data on the cost and quality of fossil fuel receipts to US electric utilities plants with a combined capacity of 25 MW or greater. Information is included on fuel origin and destination, fuel types, and sulfur content, plant types, capacity, and flue gas desulfurization method used, and fuel costs. (LCL)

  17. Energy Cost Calculator for Faucets and Showerheads | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Use gal Annual Water Cost Lifetime Water Cost WITH ELECTRIC WATER HEATING Annual Energy Use kWh Annual Energy Cost Lifetime Energy Cost ...

  18. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  19. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance....

  20. Low cost, bare plate solar air collector. Semi-annual progress report

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    A low cost, bare plate solar collector that is specifically designed to preheat ambient air with solar energy is discussed. Two prototype solar collector test systems have been designed, fabricated and assembled. Each system has been instrumented to provide instantaneous and average thermal performance data by means of a computerized data logger system. This data logger system is currently being made operational. Data collection is scheduled to begin March 1, 1980 and continue until the project completion date of June 17, 1980. Some preliminary test data have been obtained for both prototype systems. The results showed that ambient air was preheated between 5/sup 0/F and 10/sup 0/F with the systems achieving a thermal performance of between 15% and 30% efficiency.

  1. Potential for savings in compliance costs for reducing ground-level ozone possible by instituting seasonal versus annual nitric oxide emission limits

    SciTech Connect (OSTI)

    Lookman, A.A.

    1996-12-31

    Ground-level ozone is formed in the atmosphere from its precursor emissions, namely nitric oxide (NO{sub x}) and volatile organic compounds (VOC), with its rate of formation dependent on atmospheric conditions. Since ozone levels tend to be highest during the summer months, seasonal controls of precursors have been suggested as a means of reducing the costs of decreasing ozone concentrations to acceptable levels. This paper attempts to quantify what the potential savings if seasonal control were instituted for coal-fired power plants, assuming that only commercially available NO{sub x} control technologies are used. Cost savings through seasonal control is measured by calculating the total annualized cost of NO{sub x} removal at a given amount of seasonal control for different target levels of annual control. For this study, it is assumed that trading of NO{sub x} emissions will be allowed, as has been proposed by the Ozone Transportation Commission (OTC). The problem has been posed as a binary integer linear programming problem, with decision variables being which control to use at each power plant. The results indicate that requiring annual limits which are lower than seasonal limits can substantially reduce compliance costs. These savings occur because requiring stringent compliance only on a seasonal basis allows power plants to use control methods for which the variable costs are paid for only part of the year, and through the use of gas-based controls, which are much cheaper to operate in the summer months.

  2. Operations and Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Operations and Maintenance Operations and Maintenance Photo of a man, wearing a yellow hard hat, looking at a wall with panels and wires mounted to it. Lower ...

  3. U.S. Energy Information Administration | Electric Power Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual

  4. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Annual Fuel Cost gal Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and ...

  5. Design of an Actinide Burning, Lead or Lead-Bismuth Cooled Reactor That Produces Low Cost Electricty - FY-02 Annual Report

    SciTech Connect (OSTI)

    Mac Donald, Philip Elsworth; Buongiorno, Jacopo

    2002-10-01

    The purpose of this collaborative Idaho National Engineering and Environmental Laboratory (INEEL) and Massachusetts Institute of Technology (MIT) Laboratory Directed Research and Development (LDRD) project is to investigate the suitability of lead or lead-bismuth cooled fast reactors for producing low-cost electricity as well as for actinide burning. The goal is to identify and analyze the key technical issues in core neutronics, materials, thermal-hydraulics, fuels, and economics associated with the development of this reactor concept. Work has been accomplished in four major areas of research: core neutronic design, plant engineering, material compatibility studies, and coolant activation. The publications derived from work on this project (since project inception) are listed in Appendix A. This is the third in a series of Annual Reports for this project, the others are also listed in Appendix A as FY-00 and FY-01 Annual Reports.

  6. Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    412 Archive Data (The EIA-412 survey has been terminated.) The EIA-412 "Annual Electric Industry Financial Report" collected information such as income statements, balance sheets, sales and purchases, and transmission line data. Form EIA-412 data Schedules Year 2 Electric Balance Sheet 3 Electric Income Statement 4 Electric Plant 5 Taxes, Tax Equivalents, Contributions, and Services During Year 6 Sales of Electricity for Resale (Account 447) 7 Electric Operation and Maintenance

  7. Improve Operations & Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Every building's energy consumption can benefit from rigorous operations and maintenance ... for improvement, and implement low-cost changes to reduce energy consumption. ...

  8. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    SciTech Connect (OSTI)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

  9. Ion Torren Semiconductor Sequencing Allows Rapid, Low Cost Sequencing of the Human Exome ( 7th Annual SFAF Meeting, 2012)

    ScienceCinema (OSTI)

    Jenkins, David [EdgeBio

    2013-03-22

    David Jenkins on "Ion Torrent semiconductor sequencing allows rapid, low-cost sequencing of the human exome" at the 2012 Sequencing, Finishing, Analysis in the Future Meeting held June 5-7, 2012 in Santa Fe, New Mexico.

  10. Chemical coal cleaning process and costs refinement for coal-water slurry manufacture. Semi-annual progress report

    SciTech Connect (OSTI)

    Bhasin, A.K.; Berggren, M.H.; Smit, F.J.; Ames, L.B.; Ronzio, N.J.

    1985-03-01

    The Department of Energy, through the Morgantown Energy Technology Center (METC), has initiated a program to determine the feasibility and potential applications for direct firing of coal and coal-derived fuels in heat engines, specifically gas turbines and diesel engines. AMAX Extractive Research and Development, Inc. supplied METC with two lots of highly beneficiated coal slurry fuel for use in the Heat Engines programs. One of the lots was of ultra-clean coal-water slurry fuel (UCCSF) for which a two-stage caustic and acid leaching procedure was developed to chemically clean the coal. As a part of the contract, AMAX R and D developed a conceptual design and preliminary cost estimate for a commercial-scale process for UCCSF manufacture. The contract was extended to include the following objectives: define chemical cleaning and slurry preparation process conditions and costs more precisely; investigate methods to reduce the product cost; and determine the relationship, in dollars per million Btu, between product cost and fuel quality. Laboratory investigations have been carried out to define the chemical cleaning process conditions required to generate fuels containing from 0.17 to 1.0% ash. Capital and operating cost refinements are to be performed on the basis of the preferred process operating conditions identified during the laboratory investigations. Several such areas for cost reductions have been identified. Caustic strengths from 2 to 7% NaOH are currently anticipated while 25% NaOH was used as the basis for the preliminary cost estimate. In addition, leaching times for each of the process steps have been reduced to half or less of the times used for the preliminary cost estimate. Improvement of fuel quality has been achieved by use of a proprietary hot-water leaching step to reduce the residual alkali content to less than 250 ppM (Na/sub 2/O plus K/sub 2/O) on a dry coal basis. 2 refs., 3 figs., 24 tabs.

  11. HTGR Cost Model Users' Manual

    SciTech Connect (OSTI)

    A.M. Gandrik

    2012-01-01

    The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

  12. Cost Study Manual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a

  13. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th ...

  14. US nuclear power plant operating cost and experience summaries

    SciTech Connect (OSTI)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  15. Fossil plant maintenance optimization at FPC`s Crystal River Units 4 & 5

    SciTech Connect (OSTI)

    Cossey, J.; Pflasterer, R.; Colsher, R.; Toomey, G.; Smith, S.; Abbott, P.

    1996-07-01

    Florida Power Corporation recently completed a Fossil Plant Maintenance Optimization project at it`s Crystal River Units 4 and 5 coal fired power plant. The project combined Streamlined Reliability Centered Maintenance (SRCM) techniques with a Predictive Maintenance (PDM) Assessment to analyze eleven of the plants systems that represent the principal contributors to maintenance costs. The plant had an extensive existing maintenance program that included several types of condition monitoring. The Benefit-to-Cost analysis indicates that the annual savings associated with the project recommendations result in a payback period of less than one year. This paper summarizes the types of recommendations that were made and describes the processes used for both the SRCM analysis and the PDM Assessment. The SRCM analysis used proven techniques and software that have been used on other projects, including some sponsored by EPRI. The PDM Assessment process was similar to processes used previously for EPRI and non- EPRI utilities; however, this was the first project where the two processes were modified to take advantage of work performed using the other. All of the recommendations developed by the SRCM analysts were reviewed by the PDM analysts before they were finalized. The structure and flow of the project is also described including how the SRCM and PDM analysts interfaced with the plant staff and how implementation was facilitated. The analysis relied on plant experience related to the operation and maintenance history of the equipment. The recommendations for each system were reviewed by a team consisting of the first-line maintenance supervisors, the maintenance planners, and the plant technical services group. The project recommendations are essentially two-thirds implemented, with many of them implemented before the analysis was completed.

  16. Maintenance for the Millennium: Another Approach

    SciTech Connect (OSTI)

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  17. An Evaluation of the Total Cost of Ownership of Fuel Cell-Powered...

    Broader source: Energy.gov (indexed) [DOE]

    handling equipment, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. ...

  18. EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Mitchell, E.

    2011-01-18

    The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

  19. Drive alignment pays maintenance dividends

    SciTech Connect (OSTI)

    Fedder, R.

    2008-12-15

    Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

  20. Annual Reports - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    reports Annual Reports Annual Report 2015 Annual Report 2014 Annual Report 2013 Annual Report 2012 Annual Report 2011 Annual Report 2010 Annual Report 2009 Annual Report 2008...

  1. Sound maintenance practices protect fan investments

    SciTech Connect (OSTI)

    Bauer, M.

    2009-11-15

    Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

  2. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J.; Abbott, P.D.; Matusheski, R.L.; Smith, S.B.

    1996-08-01

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  3. Kennecott Utah Copper Corporation: Facility Utilizes Energy Assessments to Identify $930,000 in Potential Annual Savings

    SciTech Connect (OSTI)

    2004-07-01

    Kennecott Utah Copper Corporation (KUCC) used targeted energy assessments in the smelter and refinery at its Bingham Canyon Mine, near Salt Lake City, Utah. The assessment focused mainly on the energy-intensive processes of copper smelting and refining. By implementing the projects identified, KUCC could realize annual cost savings of $930,000 and annual energy savings of 452,000 MMBtu. The projects would also reduce maintenance, repair costs, waste, and environmental emissions. One project would use methane gas from an adjacent municipal dump to replace natural gas currently used to heat the refinery electrolyte.

  4. Sustaining the National Geothermal Data System: Considerations for a System Wide Approach and Node Maintenance, Geothermal Resources Council 37th Annual Meeting, Las Vegas, Nevada, September 29-October 2, 2013

    SciTech Connect (OSTI)

    Allison, Lee; Chickering, Cathy; Anderson, Arlene; Richard, Stephen M.

    2013-09-23

    Since the 2009 American Recovery and Reinvestment Act the U.S. Department of Energy’s Geothermal Technologies Office has funded $33.7 million for multiple data digitization and aggregation projects focused on making vast amounts of geothermal relevant data available to industry for advancing geothermal exploration. These projects are collectively part of the National Geothermal Data System (NGDS), a distributed, networked system for maintaining, sharing, and accessing data in an effort to lower the levelized cost of electricity (LCOE). Determining “who owns” and “who maintains” the NGDS and its data nodes (repositories in the distributed system) is yet to be determined. However, the invest- ment in building and populating the NGDS has been substantial, both in terms of dollars and time; it is critical that this investment be protected by ensuring sustainability of the data, the software and systems, and the accessibility of the data. Only then, will the benefits be fully realized. To keep this operational system sustainable will require four core elements: continued serving of data and applications; maintenance of system operations; a governance structure; and an effective business model. Each of these presents a number of challenges. Data being added to the NGDS are not strictly geothermal but data considered relevant to geothermal exploration and develop- ment, including vast amounts of oil and gas and groundwater wells, among other data. These are relevant to a broader base of users. By diversifying the client base to other users and other fields, the cost of maintaining core infrastructure can be spread across an array of stakeholders and clients. It is presumed that NGDS will continue to provide free and open access to its data resources. The next-phase NGDS operation should be structured to eventually pursue revenue streams to help off-set sustainability expenses as necessary and appropriate, potentially including income from: grants and contracts

  5. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  6. 1998 Cost and Quality Annual

    Gasoline and Diesel Fuel Update (EIA)

    ... of hydroelectric generation in the Pacific Northwest is reflected in the activity of the coal-fired Boardman plant, owned by Oregon-based Portland General Electric Company. ...

  7. Operations & Maintenance Best Practices - A Guide to Achieving...

    Office of Scientific and Technical Information (OSTI)

    This guide highlights operations and maintenance programs targeting energy and water ... O&M management, technologies, energy and water efficiency, and cost-reduction approaches. ...

  8. Cost and Reliability Improvement for CIGS-Based PV on Flexible Substrate: Annual Technical Report, 24 May 2006 - 25 September 2007

    SciTech Connect (OSTI)

    Weideman, S.

    2008-08-01

    Global Solar Energy has enhanced module reliability, reduced cost and improved performance of its CIGS deposition process, and reduced cost of materials and processes for contacts.

  9. Microsoft Word - S12421_2014 Annual Rpt.docx

    Office of Legacy Management (LM)

    ... groundwater during Solar Ponds Plume Treatment System repair or maintenance activities 732008 Actions continuing. U.S. Department of Energy Rocky Flats Annual Report of ...

  10. Benchmarking transition costs for the Fast Flux Test Facility

    SciTech Connect (OSTI)

    Hulvey, R.K.

    1996-12-31

    The Fast Flux Test Facility (FFTF) is a government-owned, 400-MW(thermal), sodium-cooled test reactor operated by Westinghouse Hanford Company. The reactor is shut down and is undergoing a transition to a long-term surveillance and maintenance state. The mission strategy for the FFTF transition project is to place the FFTF in a radiologically and industrially safe condition, completing the transition phase activities as soon as possible to drive down the current annual surveillance and maintenance costs from approximately $26 million/yr to roughly $1.5 million/yr. The effort to establish the shutdown and transition costs for this 7-yr, $260 million activity is a first of a kind for the U.S. Department of Energy (DOE).

  11. Preventive Maintenance Strategies for Compressed Air Systems | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Preventive Maintenance Strategies for Compressed Air Systems Preventive Maintenance Strategies for Compressed Air Systems This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs. COMPRESSED AIR TIP SHEET #6 Preventive Maintenance Strategies for Compressed Air Systems (August 2004) (245.23 KB) More Documents & Publications Effect of Intake on Compressor Performance Maintaining System Air Quality

  12. POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING

    Office of Environmental Management (EM)

    ... Four surveillance entries will be made each year on a quarterly basis beginning in February 1995. Surveillance Entries (4) Man-hours Est. Annual Cost () Operations 160 hrs 9,600 ...

  13. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  14. IEA Wind Task 26 - Multi-national Case Study of the Financial Cost of Wind Energy; Work Package 1 Final Report

    SciTech Connect (OSTI)

    Schwabe, P.; Lensink, S.; Hand, M.

    2011-03-01

    The lifetime cost of wind energy is comprised of a number of components including the investment cost, operation and maintenance costs, financing costs, and annual energy production. Accurate representation of these cost streams is critical in estimating a wind plant's cost of energy. Some of these cost streams will vary over the life of a given project. From the outset of project development, investors in wind energy have relatively certain knowledge of the plant's lifetime cost of wind energy. This is because a wind energy project's installed costs and mean wind speed are known early on, and wind generation generally has low variable operation and maintenance costs, zero fuel cost, and no carbon emissions cost. Despite these inherent characteristics, there are wide variations in the cost of wind energy internationally, which is the focus of this report. Using a multinational case-study approach, this work seeks to understand the sources of wind energy cost differences among seven countries under International Energy Agency (IEA) Wind Task 26 - Cost of Wind Energy. The participating countries in this study include Denmark, Germany, the Netherlands, Spain, Sweden, Switzerland, and the United States. Due to data availability, onshore wind energy is the primary focus of this study, though a small sample of reported offshore cost data is also included.

  15. Annual Technology Baseline

    Broader source: Energy.gov [DOE]

    The National Renewable Energy Laboratory is conducting a study sponsored by the U.S. Department of Energy DOE, Office of Energy Efficiency and Renewable Energy (EERE), that aims to document and implement an annual process designed to identify a realistic and timely set of input assumptions (e.g., technology cost and performance, fuel costs), and a diverse set of potential futures (standard scenarios), initially for electric sector analysis. This primary product of the Annual Technology Baseline (ATB) project component includes detailed cost and performance data (both current and projected) for both renewable and conventional technologies. This data is presented in MS Excel.

  16. Reducing the High Energy Costs of Alaska's Rural Water Systems

    Energy Savers [EERE]

    ... gallons of fuel oil and 25,000 kWh annually * Equates to 66% ... Important Things YOU Can Do * Annual Boiler Maintenance * Keep Detailed Fuel Usage Records by week or month * ...

  17. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  18. Finished Prokaryotic Genome Assemblies from a Low-cost Combination of Short and Long Reads (Seventh Annual Sequencing, Finishing, Analysis in the Future (SFAF) Meeting 2012)

    ScienceCinema (OSTI)

    Yin, Shuangye (Broad Institute)

    2013-02-11

    Shuangye Yin on "Finished prokaryotic genome assemblies from a low-cost combination of short and long reads" at the 2012 Sequencing, Finishing, Analysis in the Future Meeting held June 5-7, 2012 in Santa Fe, New Mexico.

  19. Economic analysis of solar industrial process heat systems: a methodology to determine annual required revenue and internal rate of return

    SciTech Connect (OSTI)

    Dickinson, W.C.; Brown, K.C.

    1981-08-11

    To permit an economic evaluation of solar industrial process heat systems, a methodology was developed to determine the annual required revenue and the internal rate of return. First, a format is provided to estimate the solar system's installed cost, annual operating and maintenance expenses, and net annual solar energy delivered to the industrial process. Then an expression is presented that gives the annual required revenue and the price of solar energy. The economic attractiveness of the potential solar investment can be determined by comparing the price of solar energy with the price of fossil fuel, both expressed in levelized terms. This requires calculation of the internal rate of return on the solar investment or, in certain cases, the growth rate of return.

  20. Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

    SciTech Connect (OSTI)

    Nelson, J. G.; R., L. Morton; Ramirez, C.; Morris, P. S.; McSwain, J. T.

    2011-02-02

    Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant “looking back” instead of “looking forward.” In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

  1. Low-Cost Manufacturable Microchannel Systems for Passive PEM...

    Broader source: Energy.gov (indexed) [DOE]

    Low Cost Manufacturable Microchannel Systems for Passive PEM Water Management Fuel Cells For Transportation - 2001 Annual Progress Report Fuel Cell Systems Annual Progress Report

  2. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Why O&M? ďż˝ 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate

  3. Fuel performance annual report for 1991. Volume 9

    SciTech Connect (OSTI)

    Painter, C.L.; Alvis, J.M.; Beyer, C.E.; Marion, A.L.; Payne, G.A.; Kendrick, E.D.

    1994-08-01

    This report is the fourteenth in a series that provides a compilation of information regarding commercial nuclear fuel performance. The series of annual reports were developed as a result of interest expressed by the public, advising bodies, and the US Nuclear Regulatory Commission (NRC) for public availability of information pertaining to commercial nuclear fuel performance. During 1991, the nuclear industry`s focus regarding fuel continued to be on extending burnup while maintaining fuel rod reliability. Utilities realize that high-burnup fuel reduces the amount of generated spent fuel, reduces fuel costs, reduces operational and maintenance costs, and improves plant capacity factors by extending operating cycles. Brief summaries of fuel operating experience, fuel design changes, fuel surveillance programs, high-burnup experience, problem areas, and items of general significance are provided.

  4. Wind energy`s declining costs

    SciTech Connect (OSTI)

    Gipe, P.

    1995-11-01

    Wind energy is competitive with traditional energy sources for the first time since European windmills graced the landscapes of the Old World. This article explores the current economics of wind power. Topics discussed include the following: standardizing cost of energy reporting and the cost of wind energy; wind power plant price; maintenance costs; effect of installed cost on the cost of energy; future costs; decommissioning; modularity; social or environmental costs; cost of capital; bidding and price.

  5. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  6. Standard Scenarios Annual Report

    Broader source: Energy.gov [DOE]

    The National Renewable Energy Laboratory is conducting a study sponsored by the U.S. Department of Energy DOE, Office of Energy Efficiency and Renewable Energy (EERE), that aims to document and implement an annual process designed to identify a realistic and timely set of input assumptions (e.g., technology cost and performance, fuel costs), and a diverse set of potential futures (standard scenarios), initially for electric sector analysis.

  7. Method and computer program product for maintenance and modernization backlogging

    DOE Patents [OSTI]

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  8. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  9. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  10. ASPEN costing manual

    SciTech Connect (OSTI)

    Schwint, K.J.

    1986-07-25

    The ASPEN program contains within it a Cost Estimation System (CES) which estimates the purchase cost and utility consumption rates for major pieces of equipment in a process flowsheet as well as installed equipment costs. These estimates are ''preliminary-study grade'' with an accuracy of plus or minus 30%. The ASPEN program also contains within it an Economic Evaluation System (EES) which estimates overall capital investment costs, annual operating expenses and profitability indices for a chemical plant. This ASPEN costing manual has been written as a guide for those inexperienced in the use of ASPEN and unfamiliar with standard cost estimating techniques who want to use the ASPEN CES and EES. The ASPEN Costing Manual is comprised of the following sections: (1) Introduction, (2) ASPEN Input Language, (3) ASPEN Cost Estimation System (CES), (4) ASPEN Cost Blocks; and (5) ASPEN Economic Evaluation System (EES).

  11. Design of an Actinide Burning, Lead or Lead-Bismuth Cooled Reactor that Produces Low Cost Electricity FY-01 Annual Report, October 2001

    SciTech Connect (OSTI)

    Mac Donald, Philip Elsworth; Buongiorno, Jacopo; Davis, Cliff Bybee; Herring, James Stephen; Loewen, Eric Paul; Smolik, Galen Richard; Weaver, Kevan Dean; Todreas, N.

    2001-10-01

    The purpose of this collaborative Idaho National Engineering and Environmental Laboratory (INEEL) and Massachusetts Institute of Technology (MIT) Laboratory Directed Research and Development (LDRD) project is to investigate the suitability of lead or lead-bismuth cooled fast reactors for producing low-cost electricity as well as for actinide burning. The goal is to identify and analyze the key technical issues in core neutronics, materials, thermal-hydraulics, fuels, and economics associated with the development of this reactor concept. Work has been accomplished in four major areas of research: core neutronic design, plant engineering, material compatibility studies, and coolant activation. The publications derived from work on this project (since project inception) are listed in Appendix A.

  12. Petroleum marketing annual 1994

    SciTech Connect (OSTI)

    1995-08-24

    The Petroleum Marketing Annual (PMA) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysis, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the fob and landed cost of imported crude oil, and the refiners` acquisition cost of crude oil. Refined petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data in the Petroleum Marketing Annual. For this production, all estimates have been recalculated since their earlier publication in the Petroleum Marketing Monthly (PMM). These calculations made use of additional data and corrections that were received after the PMM publication date.

  13. Improving cogeneration plant performance through effective maintenance strategies

    SciTech Connect (OSTI)

    Sheikh, S.M.

    1998-12-31

    Gas-fired cogeneration plants supplying power and thermal energy make up an increasing percentage of new fossil generation capacity additions, both in the US and overseas. These plants are popular, not only because they cost less to build, but also because they are highly efficient and their operation and maintenance costs are lower than plants using the traditional coal-based Rankine cycle. One of the methods being used to contain the initial cost of building cogeneration plants is to minimize redundancy both in the quantity of spare equipment specified for the various systems in the plants and in the design capacity of individual components. The overall effect of such a strategy may lead to reduced reliability and availability of the cogeneration plant in the long term. Operating cogeneration plants present a variety of technologies, equipment, and operating practices. While newer cogeneration plants routinely operate at a reliability of 90% or higher, older plants may not be able to achieve such performance due to excessive equipment breakdowns or inadequate maintenance strategies. By not having the appropriate maintenance programs in place, even newer cogeneration plants are vulnerable to deteriorating reliability and availability in the long term. This paper describes mechanisms for directing maintenance resources toward reducing current maintenance costs while maintaining high availability without sacrificing long-term reliability. The maintenance strategies discussed are those that can provide the maximum benefits for improving cogeneration plant reliability, availability, capacity, cost control, and safety.

  14. Section L Attachment G - Management Team Cost Sheet.xlsx

    National Nuclear Security Administration (NNSA)

    G Management Team Cost Sheet Definitions of items to be included in the worksheet Name Title Reimbursable* Annual Base Salary Reimbursable* Incentive Pay and bonuses Reimbursable* Deferred compensation Reimbursable* Employer contributions to Employee Stock Ownership Plans (ESOPs) Reimbursable* Employer Contributions to Defined Contribution Pension Plans Total Reimbursable* Annual Compensation Current Annual Base Salary Current Total Annual Compensation Benchmark job title/level Median Annual

  15. Step 5: Operations and Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  16. C:\\ANNUAL\\Vol2chps.v8\\ANNUAL2.VP

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    89 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 State Residential Commercial Industrial Vehicle Fuel Consumption (thousand cubic feet) Cost ...

  17. Lessons learned from substation predictive maintenance project, TC project {number_sign}7014. Final report

    SciTech Connect (OSTI)

    Geisecke, J.; Spencer, G.; Richardson, F.

    1998-12-01

    The EPRI Maintenance and Diagnostics Center, through a tailored collaboration effort with 10 utilities, developed a Substation Predictive Maintenance Program (SPDM). The objective of the program was to reduce Operation and Maintenance (O and M) costs by applying predictive/condition based maintenance practices to energized substation equipment. This report presents a summary of the project including: how new and existing diagnostic technologies and equipment were evaluated and utilized; how information was gathered in program cost justification and savings and specific work procedures and program administrative aids for a SPDM process. The program was effective in implementing a preventive or condition based maintenance process for participating utilities--enhancing the prioritization or work, redirecting maintenance activity and reducing costs. This document can serve as an implementation guide with lessons learned for substation predictive maintenance processes or to compare and contrast programs currently in place.

  18. Ocean Thermal Energy Conversion Life Cycle Cost Assessment, Final Technical Report, 30 May 2012

    SciTech Connect (OSTI)

    Martel, Laura; Smith, Paul; Rizea, Steven; Van Ryzin, Joe; Morgan, Charles; Noland, Gary; Pavlosky, Rick; Thomas, Michael; Halkyard, John

    2012-05-30

    The Ocean Thermal Energy Conversion (OTEC) Life Cycle Cost Assessment (OLCCA) is a study performed by members of the Lockheed Martin (LM) OTEC Team under funding from the Department of Energy (DOE), Award No. DE-EE0002663, dated 01/01/2010. OLCCA objectives are to estimate procurement, operations and maintenance, and overhaul costs for two types of OTEC plants: -Plants moored to the sea floor where the electricity produced by the OTEC plant is directly connected to the grid ashore via a marine power cable (Grid Connected OTEC plants) -Open-ocean grazing OTEC plant-ships producing an energy carrier that is transported to designated ports (Energy Carrier OTEC plants) Costs are developed using the concept of levelized cost of energy established by DOE for use in comparing electricity costs from various generating systems. One area of system costs that had not been developed in detail prior to this analysis was the operations and sustainment (O&S) cost for both types of OTEC plants. Procurement costs, generally referred to as capital expense and O&S costs (operations and maintenance (O&M) costs plus overhaul and replacement costs), are assessed over the 30 year operational life of the plants and an annual annuity calculated to achieve a levelized cost (constant across entire plant life). Dividing this levelized cost by the average annual energy production results in a levelized cost of electricity, or LCOE, for the OTEC plants. Technical and production efficiency enhancements that could result in a lower value of the OTEC LCOE were also explored. The thermal OTEC resource for Oahu, Hawaii and projected build out plan were developed. The estimate of the OTEC resource and LCOE values for the planned OTEC systems enable this information to be displayed as energy supplied versus levelized cost of the supplied energy; this curve is referred to as an Energy Supply Curve. The Oahu Energy Supply Curve represents initial OTEC deployment starting in 2018 and demonstrates the

  19. Cost-effectiveness analysis of TxDOT LPG fleet conversion. Volume 1. Interim research report

    SciTech Connect (OSTI)

    Euritt, M.A.; Taylor, D.B.; Mahmassani, H.

    1992-10-01

    Increased emphasis on energy efficiency and air quality has resulted in a number of state and federal initiatives examining the use of alternative fuels for motor vehicles. Texas' program for alternate fuels includes liquefied petroleum gas (LPG). Based on an analysis of 30-year life-cycle costs, development of a propane vehicle program for the Texas Department of Transportation (TxDOT) would cost about $24.3 million (in 1991 dollars). These costs include savings from lower-priced LPG and differentials between propane and gasoline/diesel in infrastructure costs for a fueling station, vehicle costs, and operating costs. The 30-year life-cycle costs translate into an average annual vehicle cost increase of $308, or about 2.5 cents more per vehicle mile of travel. Sensitivity analyses are performed on the discount rate, price of propane, maintenance savings, vehicle utilization, diesel vehicles, extended vehicle life, original equipment manufacturer (OEM) vehicles, and operating and infrastructure costs. The best results are obtained when not converting diesel vehicles, converting only large fleets, and extending the period the vehicle is kept in service. Combining these factors yields results that are most cost-effective for TxDOT. This is volume one of two volumes.

  20. Microsoft Word - S11432_2013Annual Rpt.docx

    Office of Legacy Management (LM)

    ... ftyr feet per year yr years SEP Solar Evaporation Pond Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2013 U.S. Department of Energy Doc. No. ...

  1. Microsoft Word - S08568_CY2011 Annual Rpt

    Office of Legacy Management (LM)

    ... U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance ... Rocky Flats OLF. Appendix F contains the Solar-Powered Air Stripping at the Rocky Flats ...

  2. Microsoft Word - S12421_2014 Annual Rpt.docx

    Office of Legacy Management (LM)

    ... per year SEP Solar Evaporation Pond WL yr years U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2014 April 2015 Doc. ...

  3. Spares management for improved maintenance

    SciTech Connect (OSTI)

    Moncrief, E.C.; Schroder, R.M.

    1987-01-01

    A recent survey by the US Nuclear Regulatory Commission (NRC) of maintenance practices at US nuclear power plants confirms that spare parts availability is, to some extent, a problem at all but a few plants, and that 57% of the plants sometimes operated in a limiting condition for operation over the last year due to unavailability of spare parts. That's the bad news. The good news is that significant improvement is possible without ballooning inventory. The vast majority of total dollar value of spare parts inventory at power generation stations, whether nuclear or fossil, is rarely used (parts or components that are used 12 or less times per year including many with a history of no use for many years). Inventory Solutions of Akron, Ohio, has developed such a tool, called rarely used inventory stocking logic (RUSL) which is a user-friendly decision support tool for setting spare parts reorder points. Based on statistical computations enhanced to include the most advanced techniques developed for use in aerospace and military combat readiness, RUSL calculates the optimum stocking level to achieve the desired spare part availability at the station. In doing so, it considers the importance of the part in preventing an outage, as well as key economic ordering parameters, such as part cost, carrying cost, number of parts in service, historical observed usage, anticipated future usage, and lead time to replenish.

  4. Microsoft Word - S08568_CY2011 Annual Rpt

    Office of Legacy Management (LM)

    1 April 2012 LMS/RFS/S08568 This page intentionally left blank LMS/RFS/S08568 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2011 April 2012 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2011 April 2012 Doc. No. S08568 Page i Contents Abbreviations

  5. Microsoft Word - S09641_2012Annual.docx

    Office of Legacy Management (LM)

    2 April 2013 LMS/RFS/S09641 This page intentionally left blank LMS/RFS/S09641 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2012 April 2013 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2012 April 2013 Doc. No. S09641 Page i Contents Abbreviations

  6. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

     

    We would like to inform the OpenEI community that OpenEI will be...

  7. Startup Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

  8. Levelized Power Generation Cost Codes

    Energy Science and Technology Software Center (OSTI)

    1996-04-30

    LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generationmore » cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor.« less

  9. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  10. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, ...

  11. Operations and Maintenance in Federal Facilities | Department...

    Office of Environmental Management (EM)

    Operations and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as ...

  12. Reduce Operating Costs with an EnergySmart School Project

    Broader source: Energy.gov [DOE]

    EnergySmart Schools fact sheet on how school operations and maintenance (O&M) personnel can play a greater role in managing ever-increasing energy costs.

  13. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    SciTech Connect (OSTI)

    Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-06-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

  14. Reliability centered maintenance (RCM) for substations project overview

    SciTech Connect (OSTI)

    Lyons, P.F.

    1996-08-01

    An EPRI Tailored Collaboration project establishing guidelines and tools for implementing Reliability Centered Maintenance (RCM) in substations is nearing completion and final results are being presented at this Substation RCM Conference. The ultimate goal of this RCM project is to help utilities slash substation operations and maintenance costs by optimizing equipment maintenance intervals. Preventive maintenance (PM) programs typically have been developed on a component-by-component basis, relying heavily on equipment vendors` maintenance recommendations. RCM is a logical alternative to traditional PM programs. It is intelligent, common sense maintenance that is function-based rather than component-based. First developed by the airline industry in the 1960s and further developed and applied to the nuclear industry by EPRI in the 1980s, RCM ranks the importance of each function of a system, calculates the impact the loss of the function would have on the overall system, and drives the design of appropriate maintenance tasks for each function. The nuclear industry reaped savings of at least 25% by adopting RCM, and one utility that tried this approach for substation maintenance reported savings of 13% in one year.

  15. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... The analogous criterion for DERs is 1.96. The overall goal for the water data set is to ... 1.96, and overall the data set should have 85 percent compliance with the criterion. ...

  16. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    A: Hydrologic Data A.1 Surface-Water Discharge Data A.1.1 GS01: Woman Creek at Indiana Street A.1.2 GS03: Walnut Creek at Indiana Street A.1.3 WOMPOC: Woman Creek at Eastern COU ...

  17. CX_00073_CHPRC_Annual_Routine_Maintenance.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  18. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... Mindat.org and Hudson Institute of Mineralogy, 2016. Schwartzwalder Mine (Ralston Creek Mine), Ralston Buttes District, Jefferson Co., Colorado, USA, web page http:...

  19. Microsoft Word - S05993_CY2009 Annual Rpt.doc

    Office of Legacy Management (LM)

    Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2009 April 2010 LMS/RFS/S05993 This page intentionally left blank LMS/RFS/S05993 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2009 April 2010 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2009 April

  20. Microsoft Word - S07121_CY2010 Annual Rpt

    Office of Legacy Management (LM)

    of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2010 April 2011 LMS/RFS/S07121 This page intentionally left blank LMS/RFS/S07121 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2010 April 2011 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY

  1. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page | Text Increase Font Size ...

  2. Long- vs. short-term energy storage technologies analysis : a life-cycle cost study : a study for the DOE energy storage systems program.

    SciTech Connect (OSTI)

    Schoenung, Susan M.; Hassenzahl, William V.

    2003-08-01

    This report extends an earlier characterization of long-duration and short-duration energy storage technologies to include life-cycle cost analysis. Energy storage technologies were examined for three application categories--bulk energy storage, distributed generation, and power quality--with significant variations in discharge time and storage capacity. More than 20 different technologies were considered and figures of merit were investigated including capital cost, operation and maintenance, efficiency, parasitic losses, and replacement costs. Results are presented in terms of levelized annual cost, $/kW-yr. The cost of delivered energy, cents/kWh, is also presented for some cases. The major study variable was the duration of storage available for discharge.

  3. Hydrogen Threshold Cost Calculation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Threshold Cost Calculation Hydrogen Threshold Cost Calculation DOE Hydrogen Program Record number11007, Hydrogen Threshold Cost Calculation, documents the methodology and assumptions used to calculate that threshold cost. 11007_h2_threshold_costs.pdf (443.22 KB) More Documents & Publications DOE Hydrogen and Fuel Cells Program Record 11007: Hydrogen Threshold Cost Calculation Fuel Cell Technologies Program Overview: 2010 Annual Merit Review and Peer Evaluation Meeting Fuel Cell Technologies

  4. Cost benefit analysis of waste compaction alternatives at Lawrence Livermore National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1990-11-01

    This report presents a cost benefit analysis of the potential procurement and operation of various solid waste compactors, or, of the use of commercial compaction services, for compaction of solid transuranic (TRU), low-level radioactive, hazardous, and mixed wastes at Lawrence Livermore National Laboratory (LLNL) Hazardous Waste Management (HWM) facilities. The cost benefit analysis was conducted to determine if increased compaction capacity at HWM might afford the potential for significant waste volume reduction and annual savings in material, shipping, labor, and disposal costs. In the following cost benefit analysis, capital costs and recurring costs of increased HWM compaction capabilities are considered. Recurring costs such as operating and maintenance costs are estimated based upon detailed knowledge of system parameters. When analyzing the economic benefits of enhancing compaction capabilities, continued use of the existing HWM compaction units is included for comparative purposes. In addition, the benefits of using commercial compaction services instead of procuring a new compactor system are evaluated. 31 refs., 1 fig., 6 tabs.

  5. Petroleum marketing annual, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Petroleum Marketing Annual contains statistical data on a variety of crude oils and refined petroleum products. The publication provides statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the free-on-board and landed cost of imported crude oil, and the refiners` acquisition cost of crude oil. Sales data for motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane are presented. For this publication, all estimates have been recalculated since their earlier publication in the Petroleum Marketing Monthly (PMM). These calculations made use of additional data and corrections that were received after the PMM publication dates.

  6. Petroleum marketing annual 1993

    SciTech Connect (OSTI)

    Not Available

    1995-01-01

    The Petroleum Marketing Annual (PMA) contains statistical data on a variety of crude oils and refined petroleum products. The publication provides statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the free-on-board (f.o.b.) and landed cost of imported crude oil, and the refiners acquisition cost of crude oil. Sales data for motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane are presented. For this publication, all estimates have been recalculated since their earlier publication in the Petroleum Marketing Monthly (PMM). These calculations made use of additional data and corrections that were received after the PMM publication dates.

  7. Examining the effectiveness of municipal solid waste management systems: An integrated cost-benefit analysis perspective with a financial cost modeling in Taiwan

    SciTech Connect (OSTI)

    Weng, Yu-Chi; Fujiwara, Takeshi

    2011-06-15

    In order to develop a sound material-cycle society, cost-effective municipal solid waste (MSW) management systems are required for the municipalities in the context of the integrated accounting system for MSW management. Firstly, this paper attempts to establish an integrated cost-benefit analysis (CBA) framework for evaluating the effectiveness of MSW management systems. In this paper, detailed cost/benefit items due to waste problems are particularly clarified. The stakeholders of MSW management systems, including the decision-makers of the municipalities and the citizens, are expected to reconsider the waste problems in depth and thus take wise actions with the aid of the proposed CBA framework. Secondly, focusing on the financial cost, this study develops a generalized methodology to evaluate the financial cost-effectiveness of MSW management systems, simultaneously considering the treatment technological levels and policy effects. The impacts of the influencing factors on the annual total and average financial MSW operation and maintenance (O and M) costs are analyzed in the Taiwanese case study with a demonstrative short-term future projection of the financial costs under scenario analysis. The established methodology would contribute to the evaluation of the current policy measures and to the modification of the policy design for the municipalities.

  8. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  9. 2010 DOE Hydrogen Program and Vehicle Technologies Office Annual...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Merit Review and Peer Evaluation Meeting 2010 DOE ... DOE PHEV Battery Cost Assessment Barnett TIAX LLC A ... Plug&Play Software Architecture Rousseau ANL Tradeoff ...

  10. Postdoctoral Research Awards Annual Research Meeting: Sarah Cowan...

    Energy Savers [EERE]

    EERE Postdoctoral Research Awards Annual Meeting Posters Development of a Low Cost Ultra Specular Advanced Polymer Film Solar Reflector Nano-structures Thermoelectric Materals - ...

  11. Upcoming BPAT Systems Maintenance Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming-BPAT-Systems-Maintenance-Events Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer...

  12. US Department of Energy - Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Howdy fellow energy adventurer Energy.gov is currently undergoing routine maintenance that will make it even more awesome. Please try again in a few minutes. We...

  13. Tim Kuneli, Electronics Maintenance Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

  14. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home ... Applications National Solar Thermal Test Facility Nuclear Energy Systems ...

  15. Annual Planning Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status & Schedules » Annual Planning Summaries Annual Planning Summaries Background DOE Order 451.1B, National Environmental Compliance Program, Section 4.d, requires that an annual NEPA planning summary will describe briefly: (1) the status of ongoing NEPA compliance activities, (2) any environmental assessments expected to be prepared in the next 12 months, (3) any environmental impact statements expected to be prepared in the next 24 months, and (4) the planned cost and schedule for

  16. Annual Property Inventory Continues | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status & Schedules » Annual Planning Summaries Annual Planning Summaries Background DOE Order 451.1B, National Environmental Compliance Program, Section 4.d, requires that an annual NEPA planning summary will describe briefly: (1) the status of ongoing NEPA compliance activities, (2) any environmental assessments expected to be prepared in the next 12 months, (3) any environmental impact statements expected to be prepared in the next 24 months, and (4) the planned cost and schedule for

  17. DOE/IG Annual Performance Report FY 2008, Annual Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report ...

  18. Converting urban tree maintenance residue to energy

    SciTech Connect (OSTI)

    Murphey, W.K.; Massey, J.G.; Sumrall, A.

    1980-01-01

    Three methods of utilizing urban wood waste collected by a tree maintenance firm in Houston, Texas (handling 30,000 ton waste/year) are examined: (a) hauling to a remote landfill; (b) chipping and hauling to a (local) power plant and converting to electricity; and (c) chipping and selling to an outside firm for use as boiler fuel. Breakdown of costs are given for each method in monetary and energy terms. Method (b) was the cheapest, producing a net energy gain (870 million Btu/day), but the firm chose method (c), since it realized a direct monetary return.

  19. Cost analysis guidelines

    SciTech Connect (OSTI)

    Strait, R.S.

    1996-01-10

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

  20. Development of surface mine cost estimating equations

    SciTech Connect (OSTI)

    Not Available

    1980-09-26

    Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

  1. Petroleum Marketing Annual Archives

    U.S. Energy Information Administration (EIA) Indexed Site

    Petrolem Reports Petroleum Marketing Annual Archives The Petroleum Marketing Annual was discontinued in 2010. Choose the year from the archive Petroleum Marketing Annual you wish...

  2. Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Liabilities Financial Plan Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Residential Exchange Program Surplus Power Sales...

  3. CALiPER Report 21.3. Cost Effectiveness of Linear (T8) LED Lamps

    SciTech Connect (OSTI)

    2014-05-01

    Meeting performance expectations is important for driving adoption of linear LED lamps, but cost-effectiveness may be an overriding factor in many cases. Linear LED lamps cost more initially than fluorescent lamps, but energy and maintenance savings may mean that the life-cycle cost is lower. This report details a series of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38 W total power draw) or fluorescent lamps (51 W total power draw) over a 10-year study period. Variables included LED system cost ($40, $80, or $120), annual operating hours (2,000 hours or 4,000 hours), LED installation time (15 minutes or 30 minutes), and melded electricity rate ($0.06/kWh, $0.12/kWh, $0.18/kWh, or $0.24/kWh). A full factorial of simulations allows users to interpolate between these values to aid in making rough estimates of economic feasibility for their own projects. In general, while their initial cost premium remains high, linear LED lamps are more likely to be cost-effective when electric utility rates are higher than average and hours of operation are long, and if their installation time is shorter.

  4. CALiPER Report 21.3: Cost-Effectiveness of Linear (T8) LED Lamps

    SciTech Connect (OSTI)

    Miller, Naomi J.; Perrin, Tess E.; Royer, Michael P.

    2014-05-27

    Meeting performance expectations is important for driving adoption of linear LED lamps, but cost-effectiveness may be an overriding factor in many cases. Linear LED lamps cost more initially than fluorescent lamps, but energy and maintenance savings may mean that the life-cycle cost is lower. This report details a series of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38 W total power draw) or fluorescent lamps (51 W total power draw) over a 10-year study period. Variables included LED system cost ($40, $80, or $120), annual operating hours (2,000 hours or 4,000 hours), LED installation time (15 minutes or 30 minutes), and melded electricity rate ($0.06/kWh, $0.12/kWh, $0.18/kWh, or $0.24/kWh). A full factorial of simulations allows users to interpolate between these values to aid in making rough estimates of economic feasibility for their own projects. In general, while their initial cost premium remains high, linear LED lamps are more likely to be cost-effective when electric utility rates are higher than average and hours of operation are long, and if their installation time is shorter.

  5. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  6. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011

    SciTech Connect (OSTI)

    2012-03-01

    This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

  7. Cost and Performance Baseline for Fossil Energy Plants; Volume...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cases) X LIST OF ACRONYMS AND ABBREVIATIONS AACE Association for the Advancement of Cost Engineering acfm Actual cubic feet per minute AEO Annual Energy Outlook BACT Best...

  8. Backup Power Cost of Ownership Analysis and Incumbent Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    power and presents the estimated annualized cost of ownership for fuel cell backup power systems compared with the incumbent technologies of battery and diesel generator systems. ...

  9. Maintenance Practices for LED Streetlights

    Office of Energy Efficiency and Renewable Energy (EERE)

    This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

  10. Annual Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    09 THROUGH 09/30/2010 The following Annual Freedom of Information Act report covers the Period 10/01/2009, through 09/30/2010, as required by 5 U.S.C. 552. I. BASIC INFORMATION REGARDING REPORT 1. Kevin T. Hagerty, Director Office of Information Resources, MA-90 U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 202-586-5955 Alexander Morris, FOIA Officer Sheila Jeter, FOIA/Privacy Act Specialist FOIA Office, MA-90 Office of Information Resources U.S. Department of Energy

  11. Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    2009-04-01

    This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity

  12. Efficiency Lighting & Maintenance Inc | Open Energy Information

    Open Energy Info (EERE)

    & Maintenance Inc Jump to: navigation, search Name: Efficiency Lighting & Maintenance Inc Address: 5a Del Mar Drive Place: Brookfield, Connecticut Zip: 06804 Region: Northeast - NY...

  13. Geothermal Data Development, Collection, and Maintenance | Open...

    Open Energy Info (EERE)

    Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading...

  14. Maintenance Planner | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance Planner Department: Facilities Requisition Number: 1501075 Position Summary: This multi-trade Maintenance Planner position will enhance the Lab's Facilities Division...

  15. Oregon Department of Transportation - Maintenance and Operations...

    Open Energy Info (EERE)

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  16. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  17. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  18. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spring Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air ...

  19. Requirements Based Surveillance and Maintenance Review Process...

    Energy Savers [EERE]

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and ...

  20. FAQS Reference Guide - Facility Maintenance Management | Department...

    Broader source: Energy.gov (indexed) [DOE]

    are developed to assist operators, maintenance personnel, and the technical staff in ... (STD)-1181-2014, Facility Maintenance Management Functional Area Qualification Standard. ...

  1. Preventive Maintenance Strategies for Compressed Air Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Suggested Actions * Establish a regular, well-organized maintenance program in accordance ... that all compressed air system maintenance needs are performed properly, on ...

  2. 2011 Annual Planning Summary for Bonneville Power Administration (BPA) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Annual Planning Summary for Bonneville Power Administration (BPA) 2011 Annual Planning Summary for Bonneville Power Administration (BPA) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2011 Annual Planning Summary for Bonneville Power Administration

  3. Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2005 Annual Operation Plan, 2004 Annual Report.

    SciTech Connect (OSTI)

    Harty, Harold R.; Lundberg, Jeffrey H.; Penney, Aaron K.

    2005-02-01

    The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

  4. Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2004 Annual Operation Plan, 2003 Annual Report.

    SciTech Connect (OSTI)

    Harty, Harold R.; Penney, Aaron K.; Larson, Roy Edward

    2005-12-01

    The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

  5. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    SciTech Connect (OSTI)

    Poderis, Reed J.; King, Rebecca A.

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  6. NERSC Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Reports NERSC Annual Reports Sort by: Default | Name 2015AnnualReportcover NERSC Annual Report 2015 Download Image: 2015AnnualReportcover.png | png | 542 KB Download File: 2015NERSCAnnualReportFinal.pdf | pdf | 4.8 MB 2014cover.jpg NERSC Annual Report 2014 Download Image: 2014cover.jpg | jpg | 202 KB Download File: 2014NERSCAnnualReport.pdf | pdf | 6.1 MB 2013-Annual-Report-cover.png NERSC Annual Report 2013 Download Image: 2013-Annual-Report-cover.png | png | 645 KB Download File:

  7. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  8. Annual Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Reports Annual Reports Note: Some of the following documents are in PDF and will require Adobe Reader for viewing. Freedom of Information Act Annual Reports Annual Report for 2015 Annual Report for 2014 Annual Report for 2013 Annual Report for 2012 Annual Report for 2011 Annual Report for 2010 Annual Report for 2009 Annual Report for 2008 (pdf) Annual Report for 2007 (pdf) Annual Report for 2006 (pdf) Annual Report for 2005 (pdf) Annual Report for 2004 (pdf) Annual Report for 2003 (pdf)

  9. PHEV Battery Cost Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Cost Assessment PHEV Battery Cost Assessment 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting es111_gallagher_2012_o.pdf (1.1 MB) More Documents & Publications Promises and Challenges of Lithium- and Manganese-Rich Transition-Metal Layered-Oxide Cathodes PHEV Battery Cost Assessment EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects

  10. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. "Annual Coal Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual Coal Report Data Released: January 20, 2015 Data for: 2013 Re-Release Date: April 23, 2015 (CORRECTION) Annual Coal Report 2013 CorrectionUpdate April 23, 2015 The Annual ...

  12. Cost of presumptive source term Remedial Actions Laboratory for energy-related health research, University of California, Davis

    SciTech Connect (OSTI)

    Last, G.V.; Bagaasen, L.M.; Josephson, G.B.; Lanigan, D.C.; Liikala, T.L.; Newcomer, D.R.; Pearson, A.W.; Teel, S.S.

    1995-12-01

    A Remedial Investigation/Feasibility Study (RI/FS) is in progress at the Laboratory for Energy Related Health Research (LEHR) at the University of California, Davis. The purpose of the RI/FS is to gather sufficient information to support an informed risk management decision regarding the most appropriate remedial actions for impacted areas of the facility. In an effort to expedite remediation of the LEHR facility, the remedial project managers requested a more detailed evaluation of a selected set of remedial actions. In particular, they requested information on both characterization and remedial action costs. The US Department of Energy -- Oakland Office requested the assistance of the Pacific Northwest National Laboratory to prepare order-of-magnitude cost estimates for presumptive remedial actions being considered for the five source term operable units. The cost estimates presented in this report include characterization costs, capital costs, and annual operation and maintenance (O&M) costs. These cost estimates are intended to aid planning and direction of future environmental remediation efforts.

  13. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J.

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  14. Annual Performance Report

    Office of Legacy Management (LM)

    Department of Energy Annual Performance Report, Shiprock, New Mexico October 2014 Doc. ... 25 Annual Performance Report, Shiprock, New Mexico U.S. Department of Energy Doc. No. ...

  15. Petroleum Marketing Annual

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    PDF 1.2MB . Front Matter . Petroleum Marketing Annual Cover Page, Preface, and Table of Contents PDF . Highlights . Petroleum Marketing Annual Highlights PDF . . Summary Statistics ...

  16. Petroleum Marketing Annual

    Gasoline and Diesel Fuel Update (EIA)

    PDF 2.9MB . . Front Matter . Petroleum Marketing Annual Cover Page, Contacts, Preface, and Table of Contents PDF . . Highlights . Petroleum Marketing Annual Highlights PDF . . ...

  17. Petroleum Marketing Annual 1997

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    PDF 1.2MB . . Front Matter . Petroleum Marketing Annual Cover Page, Contacts, Preface, and Table of Contents PDF . . Highlights . Petroleum Marketing Annual Highlights PDF . . ...

  18. Annual Coal Distribution Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Coal Distribution Report Release Date: April 16, 2015 | Next Release Date: March 2016 | full report | RevisionCorrection Revision to the Annual Coal Distribution Report ...

  19. Petroleum Marketing Annual 2009

    U.S. Energy Information Administration (EIA) Indexed Site

    Petroleum Marketing Annual 2009 Released: August 6, 2010 Next Release Date: Discontinued find annual data in Petroleum Marketing Monthly Monthly price and volume statistics on...

  20. Operations and Maintenance Manual for Large Aperture Scanner System

    SciTech Connect (OSTI)

    Jones, Anthony M.; Hall, Thomas E.

    2010-04-08

    Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

  1. Pump Life Cycle Costs: A Guide to LCC Analysis for Pumping Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Finally, the plant designer or manager might need to consider maintenance or servicing costs, particularly where these are to be subcontracted, or spare parts are to be provided ...

  2. Is it Cost-Effective to Replace Old Eddy-Current Drives? - Motor Tip Sheet #12

    SciTech Connect (OSTI)

    2008-07-01

    New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may be cost-effective replacements for aging or maintenance-intensive eddy-current drives.

  3. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010

    SciTech Connect (OSTI)

    2011-03-01

    This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

  4. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  5. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature

  6. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive

  7. BPA's Costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings and Workshops Customer...

  8. H2A Delivery: Miscellaneous Cost and H2 Losses

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Miscellaneous Costs and H2 Losses Hydrogen Delivery Analysis Meeting May 8-9, 2006 Matt Ringer National Renewable Energy Laboratory H2A Delivery Presentation Outline * Direct and Indirect Costs * Operating and Maintenance Costs * Labor Costs and Scaling Factor * Component Hydrogen Losses H2A Delivery Direct and Indirect Costs * Currently posted model includes site preparation, engineering and design, project contingency, one-time licensing fees and permitting - Factor of 1.225 above installed

  9. 2008 Annual Report

    SciTech Connect (OSTI)

    2008-01-01

    This annual report includes: a brief overview of Western; FY 2008 operational highlights; and financial data.

  10. Maintenance is the cheapest way to improve fine coal dewatering

    SciTech Connect (OSTI)

    Burger, J.

    1986-01-01

    There are a great many things that a preparation plant operator can do right now to increase fine coal dewatering effectiveness and maintenance is one of them, says Donald A. Dahlstrom, at the University of Utah. Dewatering of fine coal is increasingly important, because electricity generation, the largest coal consumer, is so strongly affected by the moisture content. Every pound of water put into a boiler raises costs about 2 1/2 cents. The heat it takes to turn water to steam and get it out the stack is heat that could have been used to generate power. In addition, there is the cost of shipping the water. You can add the freight costs to that. In contrast it costs about 1/2-cent/lb to remove the water at the preparation plant.

  11. Annual report, October 1, 1979-September 30, 1980

    SciTech Connect (OSTI)

    Not Available

    1981-05-01

    This annual report covers research progress on each of the following areas: (1) PLT device, (2) PDX, (3) spheromak, (4) smaller devices, (5) theory, (6) TFTR, (7) applied physics, (8) TFTR blanket module experiments, (9) advanced toroidal facility, (10) advanced projects design and analysis, (11) engineering, and (12) fabrication, operations and maintenance. (MOW)

  12. Results from the OECD report on international projections of electricity generating costs

    SciTech Connect (OSTI)

    Paffenbarger, J.A.; Bertel, E.

    1998-07-01

    The International Energy Agency and Nuclear Energy Agency of the OECD have periodically undertaken a joint study on electricity generating costs in OECD Member countries and selected non-Member countries. This paper presents key results from the 1998 update of this study. Experts from 19 countries drawn from electric utility companies and government provided data on capital costs, operating and maintenance costs, and fuel costs from which levelized electricity generating costs (US cents/kWh) for baseload power plants were estimated in each country using a common set of economic assumptions. Light water nuclear power plants, pulverized coal plants, and natural gas-fired combined cycle gas turbines were the principal options evaluated. five and 10% discount rates, 40-year operating lifetime, and 75% annual load factor were the base assumptions, with sensitivity analyses on operating lifetime and load factor. Fuel costs and fuel escalation were provided individually by country, with a sensitivity case to evaluate costs assuming no real fuel price escalation over plant lifetimes. Of the three principal fuel/technology options, none is predominantly the cheapest option for all economic assumptions. However, fossil-fueled options are generally estimated to be the least expensive option. The study confirms that gas-fired combined cycles have improved their economic performance in most countries in recent years and are strong competitors to nuclear and coal-fired plants. Eleven out of the 18 countries with two or more options show gas-fired plants to be the cheapest option at 10% discount rate. Coal remains a strong competitor to gas when lower discount rates are used. Nuclear is the least expensive at both 5 and 10% discount rate in only two countries. Generally, with gas prices above 5 US$/GJ, nuclear plants constructed at overnight capital costs below 1 650 $/kWe have the potential to be competitive only at lower discount rates.

  13. Solar Water Heating with Low-Cost Plastic Systems (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-01-01

    Newly developed solar water heating technology can help Federal agencies cost effectively meet the EISA requirements for solar water heating in new construction and major renovations. This document provides design considerations, application, economics, and maintenance information and resources.

  14. Challenge Accepted: Reducing the Soft Costs of Going Solar

    Broader source: Energy.gov [DOE]

    Every year, it becomes even more affordable to “go solar.” However, one thing remains consistent: the non-hardware, or “soft” costs related to permitting, installation, and maintenance account for...

  15. Annual Review | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ON-SITE RESEARCH PUBLICATIONS Annual Reviews FY13 Annual Review FY12 Annual Review FY11 Annual Review...

  16. CRAD, Maintenance Assessment Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to

  17. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming...

  19. Reliability centered maintenance (RCM) products - future

    SciTech Connect (OSTI)

    Lyons, P.F.

    1996-08-01

    This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

  20. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Annual Performance Report FY 2005 Annual Performance Plan FY 2006 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 (2.47 MB) More Documents & Publications Annual Performance Report FY 2005 Annual Performance Plan FY 2006 Vehicle Technologies Office Merit Review 2016: Overview and Progress of the Advanced Battery Materials Research (BMR) Program Auidt

  14. PECO energy adopts reliability centered maintenance to improve preventive maintanance of power delivery equipment

    SciTech Connect (OSTI)

    Maurer, R.; Linn, P.; Termine, G.; Schwan, C.

    1996-08-01

    One of the biggest challenges facing PECO Energy, in the area of power delivery, is holding the line on maintenance costs while preserving high levels of worker safety, enhancing equipment reliability, and improving customer satisfaction. PECO has taken an early lead in tackling this apparent industry-wide problem by adopting a proven preventive maintenance (PM) optimization method known as Reliability Centered Maintenance (RCM). The purpose of this paper is to explain: (1) how RCM was successfully introduced at PECO using data, lessons learned and consulting support associated with EPRI`s RCM for Substations research project; (2) how the RCM methodology will be implemented over the long term for the Power Delivery System; and (3) how the RCM activities will help lead to the development of a living PM program that will foster a continuous improvement in equipment reliability through cost-effective preventive maintenance.

  15. Human Factors/Ergonomics Handbook for the Design for Ease of Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 2.0 DESIGN FOR MAINTAINABILITY This section contains human factors guidance for designing systems, subsystems, equipment and facilities so that maintenance is easy and cost effective. 2.1 Unitization, modularization, and standardization Unitization refers to separating equipment into physically and functionally distinct units to allow for easy removal and replacement. This type of equipment separation will permit division of maintenance responsibility, especially troubleshooting, among

  16. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  17. SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance

    Office of Environmental Management (EM)

    SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this ...

  18. Solar Water Heating System Maintenance and Repair | Department...

    Energy Savers [EERE]

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | ...

  19. 2013 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Mone, C.; Smith, A.; Maples, B.; Hand, M.

    2015-02-01

    This report uses representative project types to estimate the levelized cost of wind energy (LCOE) in the United States for 2013. Scheduled to be published on an annual basis, it relies on both market and modeled data to maintain a current understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed from this analysis are used to inform wind technology cost projections, goals, and improvement opportunities.

  20. NERSC Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Annual Reports NERSC Annual Reports Sort by: Default | Name anrep2000.png NERSC Annual Report 2000 Download Image: anrep2000.png | png | 203 KB Download File: NERSCAnnualReport2000.pdf | pdf | 4.9 MB anrep2001.png NERSC Annual Report 2001 Download Image: anrep2001.png | png | 175 KB Download File: annrep01.pdf | pdf | 7.1 MB anrep2002.png NERSC Annual Report 2002 Download Image: anrep2002.png | png | 55 KB Download File: annrep02.pdf | pdf | 3.4 MB anrep2003.png NERSC Annual Report 2003

  1. Postdoctoral Research Awards Annual Research Meeting: Brandon Mercado |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Brandon Mercado Postdoctoral Research Awards Annual Research Meeting: Brandon Mercado Poster Presentation at 2012 EERE Annual Research Meeting, Postdoctoral Research Awards, from the U.S. Department of Energy. mercadob_2012poster.pdf (1.65 MB) More Documents & Publications EERE Postdoctoral Research Awards Annual Meeting Posters Final Report - Low Cost, Epitaxial Growth of II-VI Materials for Multijunction Photovoltaic Cells 2014 SunShot Initiative Portfolio Book:

  2. FY 2007 Annual Uncosted Balances Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Uncosted Balances Reports » FY 2007 Annual Uncosted Balances Report FY 2007 Annual Uncosted Balances Report The Department faced significant challenges due to the unusually long Continuing Resolution (CR), which extended until April 2007. Under the CR the Department must act conservatively to ensure that obligations and costs are restrained in order to mitigate any negative impacts should actual appropriations differ significantly from planned and budgeted amounts. In addition, the

  3. 2016 Annual Technology Baseline (ATB) (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Conference: 2016 Annual Technology Baseline (ATB) Citation Details In-Document Search Title: 2016 Annual Technology Baseline (ATB) Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), National Renewable Energy Laboratory provides an organized and centralized dataset that was reviewed by internal and external experts. It uses the best information

  4. Stanford Geothermal Workshop 2012 Annual Meeting

    Broader source: Energy.gov (indexed) [DOE]

    Technologies Program Stanford Geothermal Workshop 2012 Annual Meeting Jan 30-Feb 1, 2012 Doug Hollett, Program Manager Glass Buttes, OR (DOE) Energy Efficiency & Renewable Energy eere.energy.gov Accelerate Near Term Hydrothermal Growth * Lower hydrothermal exploration risks and costs. * Lower hydrothermal cost of electricity to 6 cents/kWh by 2020. * Accelerate the development of 30 GWe of undiscovered hydrothermal resources. Secure the Future with Enhanced Geothermal Systems (EGS) *

  5. Annual Fuel Economy Guide with 2014 Models Released | Department...

    Broader source: Energy.gov (indexed) [DOE]

    U.S. Environmental Protection Agency (EPA) and the Energy ... including an estimated annual fuel cost for each vehicle. ... like air conditioning usage and a variety of speed and ...

  6. Annual Performance Report

    Office of Legacy Management (LM)

    U.S. Department of Energy Annual Performance Report, Shiprock, New Mexico August 2015 Doc. ... 25 Annual Performance Report, Shiprock, New Mexico U.S. Department of Energy Doc. No. ...

  7. Annual Performance Report FY 2012, Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, Annual Performance Plan FY 2013 & FY 2014 Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY 2014 PDF icon Annual Performance Report and Plan FY12 FY13 FY14 ...

  8. FY 2012 Lightweight Materials Annual Report

    SciTech Connect (OSTI)

    Warren, David C.

    2013-04-15

    The FY 2012 Annual Progress Report for Lightweight Materials provides a detailed description of the activities and technical accomplishments which focuses on the development and validation of advanced materials and manufacturing technologies to significantly reduce light and heavy duty vehicle weight without compromising other attributes such as safety, performance, recyclability, and cost.

  9. NASEO 2015 Annual Meeting

    Broader source: Energy.gov [DOE]

    The National Association of State Energy Officials (NASEO) Annual Meeting will be held in San Diego, California.

  10. Annual Reports - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Reports Soil & Groundwater Home Annual Reports Environmental Data Access Administrative Record Annual Reports Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size NEW The Groundwater Remediation Project issues an annual report describing its accomplishments and plans. The projects associated with the Groundwater Remediation Project also issue periodic status reports. Those reports can be found in this section. Title Issue Date Rev. Document Information

  11. Annual Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Annual Site Environmental Report Updated July 24, 2015 NETL's Annual Site Environmental Report for 2014 -ii- 2014 Annual Site Environmental Report September 9, 2015 U.S. Department of Energy National Energy Technology Laboratory Albany, Oregon Anchorage, Alaska Morgantown, West Virginia Pittsburgh, Pennsylvania Sugar Land, Texas NETL's Annual Site Environmental Report for 2014 -iii- Disclaimer This report was prepared as an account of work sponsored by an agency of the U.S. Government.

  12. Draft 2014 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan (4.52 MB) More Documents & Publications 2011 Annual Plan 2013 Annual Plan Sec. 999 Annual Plan 2012

  13. 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2012 Annual Plan Section 999: 2012 Annual Plan Section 999 - 2012 Annual Plan (3.97 MB) More Documents & Publications 2011 Annual Plan Sec. 999 Annual Plan 2012 2013 Annual Plan

  14. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  15. Lower Cost Carbon Fiber Precursors | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation lm004_warren_2011_o.pdf (1.88 MB) More Documents & Publications Lower Cost Carbon Fiber Precursors Lower Cost Carbon Fiber Precursors Low Cost Carbon Fiber Overview

  16. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  17. Solicitation - Geothermal Drilling Development and Well Maintenance Projects

    SciTech Connect (OSTI)

    Sattler, A.R.

    1999-07-07

    Energy (DOE)-industry research and development (R and D) organization, sponsors near-term technology development projects for reducing geothermal drilling and well maintenance costs. Sandia National Laboratories (Albuquerque, NM) administers DOE funds for GDO cost-shared projects and provides technical support. The GDO serves a very important function in fostering geothermal development. It encourages commercialization of emerging, cost-reducing drilling technologies, while fostering a spirit of cooperation among various segments of the geothermal industry. For Sandia, the GDO also serves as a means of identifying the geothermal industry's drilling fuel/or well maintenance problems, and provides an important forum for technology transfer. Successfully completed GDO projects include: the development of a high-temperature borehole televiewer, high-temperature rotating head rubbers, a retrievable whipstock, and a high-temperature/high-pressure valve-changing tool. Ongoing GDO projects include technology for stemming lost circulation; foam cement integrity log interpretation, insulated drill pipe, percussive mud hammers for geothermal drilling, a high-temperature/ high-pressure valve changing tool assembly (adding a milling capability), deformed casing remediation, high- temperature steering tools, diagnostic instrumentation for casing in geothermal wells, and elastomeric casing protectors.

  18. 2011 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A.; Schwabe, P.

    2013-03-01

    This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

  19. DIRECT COSTS OF DISABLING WORKPLACE INJURIES GROW 2.5 PERCENT

    Broader source: Energy.gov [DOE]

    April 7, 2003 Annual Liberty Mutual Workplace Safety Index Shows Direct Costs of the Three Leading Causes of Workplace Incidents Grew Significantly Faster...

  20. CRAD, NNSA - Maintenance (MN) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NNSA - Maintenance (MN) CRAD, NNSA - Maintenance (MN) CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs. CRADs consist of a Performance Objective that identifies the expectation(s) or requirement(s) to be verified, which reflect the complete scope of the assessment; Criteria that provide specifics by which the performance objectives are measured, including

  1. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  2. NERI 2004 Annual Report

    SciTech Connect (OSTI)

    2004-01-01

    The United States Department of Energy (DOE) created the Nuclear Energy Research Initiative (NERI) in Fiscal Year (FY) 1999 in response to recommendations provided by the President's Committee of Advisors on Science and Technology. The purpose of NERI is to sponsor research and development (R&D) in the nuclear energy sciences to address the principal barriers to the future use of nuclear energy in the United States. NERI is helping to preserve the nuclear science and engineering infrastructure within the Nation's universities, laboratories, and industry, and is advancing the development of nuclear energy technology, enabling the United States to maintain a competitive position in nuclear science and technology. Research under this initiative also addresses issues associated with the maintenance of existing U.S. nuclear plants. The NERI program is managed and funded by DOE's Office of Nuclear Energy, Science and Technology. ''The Nuclear Energy Research Initiative 2004 Annual Report'' serves to inform interested parties of progress made in NERI on a programmatic level as well as research progress made on individual NERI projects. Section 2 of this report provides background on the creation and implementation of NERI and on the focus areas for NERI research. Section 3 provides a discussion on NERI's mission, goals and objectives, and work scope. Section 4 highlights the major accomplishments of the NERI projects and provides brief summaries of the NERI research efforts that were completed in 2004. Section 5 provides a discussion on the impact NERI has had on U.S. university nuclear programs. Sections 6 through 8 provide project status reports by research area for each of the fiscal year (FY) 2001 and 2002 projects that were active in FY 2004. Research objectives, progress made over the last year, and activities planned for the next year are described for each project. Sections 9 through 11 present each of the newly awarded 2005 NERI projects in their corresponding

  3. levelized costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    levelized costs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  4. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  5. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  6. 2014 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Mone, Christopher; Stehly, Tyler; Maples, Ben; Settle, Edward

    2015-10-01

    This report uses representative commercial projects to estimate the levelized cost of energy (LCOE) for both land-based and offshore wind plants in the United States for 2014. Scheduled to be published on an annual basis, the analysis relies on both market and modeled data to maintain an up-to-date understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed by the National Renewable Energy Laboratory (NREL) are used in this analysis to inform wind technology cost projections, goals, and improvement opportunities.

  7. How three smart managers control steam costs

    SciTech Connect (OSTI)

    Kendall, R.

    1982-11-01

    Three steam-intensive companies report innovative ways to reduce steam-production costs. Goodyear Tire and Rubber Co. concentrated on regular maintenance, process modifications, and heat recovery, but also has an on-going policy of seeking further cost savings. Future efforts will explore computer-based boiler controls. Zenith Radio Corporation's color picture tube-making process uses 12% less steam after 700 mechanical steam traps were replaced with fixed-orifice traps. Petro-Tex Chemical Corp. reduced steam costs by monitoring and optimizing process units and by making capital investments to improve steam management. (DCK)

  8. SEC L_Attach G_Key Personnel Cost Sheet

    National Nuclear Security Administration (NNSA)

    L, Attachment G - Management Team Cost Sheet Definitions of items to be included in the worksheet Name Title Key Personnel (Y/N) Reimbursable Annual Base Salary Reimbursable Incentive Pay and bonuses Reimbursable Deferred compensation Reimbursable Employer contributions to Employee Stock Ownership Plans (ESOPs) Reimbursable Employer Contributions to Defined Contribution Pension Plans Current Annual Base Salary Current Total Annual Compensation An ESOP is a stock bonus plan designed to invest

  9. OHA 2011 ANNUAL REPORT | Department of Energy

    Energy Savers [EERE]

    1 ANNUAL REPORT OHA 2011 ANNUAL REPORT Report on the FY 2011 operations of the Office of Hearings and Appeals (OHA). Here are highlights for the past year: Alternative DisputeResolution. In FY 2011, we were happy to welcome aboard the DOE's Office of Conflict Resolution and Prevention (OCPR), which joined OHA in February 2011. OCPR, formerly a part of the Office of General Counsel, serves as a resource to all DOE components and contractors to explore efficient and cost effective means of

  10. Report on Transmission Cost Allocation for RTOs and Others (Presentation)

    SciTech Connect (OSTI)

    Coles, L.

    2011-06-01

    Presented at the MARC 2011 Annual Conference, 6 June 2011, Rapid City, South Dakota. This presentation provides an overview of the latest research findings and policy developments pertaining to cost allocation and new variable generation resources on the power grid.