National Library of Energy BETA

Sample records for annual maintenance bolts

  1. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  2. Bolt failure detection

    DOE Patents [OSTI]

    Sutton, Jr., Harry G.

    1984-01-01

    Bolts of a liquid metal fast breeder reactor, each bolt provided with an internal chamber filled with a specific, unique radioactive tag gas. Detection of the tag gas is indicative of a crack in an identifiable bolt.

  3. Roof bolting improvements

    SciTech Connect (OSTI)

    Fiscor, S.

    2008-11-15

    Suppliers partner with mine operators to offer safer, more productive tools for roof bolting. 4 figs.

  4. Steam trap maintenance management saves $180,000 annually

    SciTech Connect (OSTI)

    Franks, F.C.; Wickersham, C.

    1985-12-01

    The Reichhold Chemical plant is located in Elizabeth, NJ. At this location, the cost of steam had skyrocketed to $5.30 per million Btu. The plant has 600 steam traps manufactured by ten different companies. Some 17 different models of traps are used with 33 piping configurations. There are five different operating pressures throughout the plant ranging from 15-175 psig, including 30, 65, and 120 psig. Five different applications of steam usage can be broken down as follows: steam tracing (56%); drip (21%); comfort heating (18%); tank coil (4%); and process (1%). In the fall of 1983, the annual yearly inspection of steam traps was supplanted with an independent trap survey service, specializing in detecting the malfunctioning of various types of steam traps. The basic program included location and tagging of all steam traps; survey and inspection of steam trap population; development of a trap map; and full computer analysis of collected data. It was determined that approximately 3919 lb/hr of steam could be saved by repairing the failed open traps and implementing the report's recommendations. There were also benefits from fixing the failed closed traps which were out of service at the time of the survey. These traps do not allow the flow of steam or condensate to pass through the orifice. This condition causes condensate to back up and reduce efficiency. The maintenance management has been pleased with the results and recommendations of the program. It has provided them with a complete inventory and status report of the 600 traps plantwide. It saved $180,000 over the previous year in energy expenditures. This was the most important contribution in lowering the plant energy costs.

  5. Thrust bolting: roof bolt support apparatus

    DOE Patents [OSTI]

    Tadolini, Stephen C.; Dolinar, Dennis R.

    1992-01-01

    A method of installing a tensioned roof bolt in a borehole of a rock formation without the aid of a mechanical anchoring device or threaded tensioning threads by applying thrust to the bolt (19) as the bonding material (7') is curing to compress the strata (3) surrounding the borehole (1), and then relieving the thrust when the bonding material (7') has cured.

  6. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    SciTech Connect (OSTI)

    Kalispel Tribe, Department of Natural Resources

    1998-01-01

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  7. Roof bolting equipment & technology

    SciTech Connect (OSTI)

    Fiscor, S.

    2009-04-15

    Technology provides an evaluator path to improvement for roof bolting machines. Bucyrus offers three different roof bolts models for various mining conditions. The LRB-15 AR is a single-arm boiler recommended for ranges of 32 inches and above; the dual-arm RB2-52A for ranges of 42 inches and above; and the dual-arm RB2-88A for ranges of 54 inches and above. Design features are discussed in the article. Developments in roof bolting technology by Joy Mining Machinery are reported. 4 photos.

  8. Measuring mine roof bolt strains

    DOE Patents [OSTI]

    Steblay, Bernard J.

    1986-01-01

    A mine roof bolt and a method of measuring the strain in mine roof bolts of this type are disclosed. According to the method, a flat portion on the head of the mine roof bolt is first machined. Next, a hole is drilled radially through the bolt at a predetermined distance from the bolt head. After installation of the mine roof bolt and loading, the strain of the mine roof bolt is measured by generating an ultrasonic pulse at the flat portion. The time of travel of the ultrasonic pulse reflected from the hole is measured. This time of travel is a function of the distance from the flat portion to the hole and increases as the bolt is loaded. Consequently, the time measurement is correlated to the strain in the bolt. Compensation for various factors affecting the travel time are also provided.

  9. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect (OSTI)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  10. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    7 2.0 Site Operations and Maintenance 2.1 Annual Site Inspection The Site must be inspected annually for evidence of significant erosion and IC violations, in accordance with RFLMA Attachment 2, Sections 5.3.4 and 5.3.6. The 2015 inspection was conducted on March 17, 2015, and reported in the Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities, First Quarter Calendar Year 2015 (DOE 2015d). The inspection includes observations associated with the following condition

  11. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    Flats Site, Colorado Calendar Year 2015 April 2016 LMS/RFS/S13696 This page intentionally left blank U.S. Department of Energy Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado April 2016 Doc. No. S13696 Page i Contents Abbreviations .................................................................................................................................xv Executive Summary

  12. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    SciTech Connect (OSTI)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see Table 5). Purchases are itemized in Appendix D and E. FishPro, Inc. assisted tribal staff with equipment purchases. The unspent contract balances will be carried forward to the ensuing year to complete equipment purchases essential to hatchery operations. The NPTH activities focused on completion of the Northwest Power Planning Council Step-3 decision that authorized hatchery construction. Construction began in July 2000. It is anticipated to continue through October 2002. At the end of 2001, the hatchery facilities were approximately 70% completed and the budget approximately 90% expended. The following facilities are either completed or in final stages of construction: (1) NPTH Central Hatchery facility at Site 1705, and (2) North Lapwai Valley satellite, and (3) Sweetwater Springs satellite, and (4) Yoosa-Camp satellite, and (5) Newsome Creek satellite, and (6) Lukes Gulch satellite, and (7) Cedar Flats satellite.

  13. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 2000 Annual Report.

    SciTech Connect (OSTI)

    Bluff, Stanley

    2000-12-01

    No Annual Production Goals were achieved for the year. The Kalispel Hatchery experienced two episodes of brood fish mortality. The first due to a standpipe malfunction and the second attributed to gas bubble disease caused by elevated Total Dissolved Gases (TDG's) in the reservoir. To date, the hatchery has 29 brood fish in the raceway and ready to spawn. If all things go well this spring, hatchery operations should be well underway next year.

  14. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality (specifically dissolved oxygen and temperature) is the main limiting factor in our fisheries.

  15. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  16. Roof Separation Highlights Bolting Priority

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP UPDATE: January 21, 2015 Roof Separation Highlights Bolting Priority On January 15, Mining and Ground Control Engineers at WIPP discovered that a portion of the ceiling in the Panel 3 access drift had fallen in a restricted access area. The roof fall was discovered during routine ground control and bulkhead inspections conducted by WIPP geotechnical staff, and the section that fell was estimated to be approximately 8' long by 8'wide and 24" thick. Access to this area has been

  17. New Hybrid Bolting Machine Ready for Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Before the bolter can be placed into service, portable power units that will supply the necessary electricity ... The bolts slow the natural movement of the salt and help prevent ...

  18. Stress analysis of closure bolts for shipping casks

    SciTech Connect (OSTI)

    Mok, G.C.; Fischer, L.E. ); Hsu, S.T. )

    1993-01-01

    This report specifies the requirements and criteria for stress analysis of closure bolts for shipping casks containing nuclear spent fuels or high level radioactive materials. The specification is based on existing information conceming the structural behavior, analysis, and design of bolted joints. The approach taken was to extend the ASME Boiler and Pressure Vessel Code requirements and criteria for bolting analysis of nuclear piping and pressure vessels to include the appropriate design and load characteristics of the shipping cask. The characteristics considered are large, flat, closure lids with metal-to-metal contact within the bolted joint; significant temperature and impact loads; and possible prying and bending effects. Specific formulas and procedures developed apply to the bolt stress analysis of a circular, flat, bolted closure. The report also includes critical load cases and desirable design practices for the bolted closure, an in-depth review of the structural behavior of bolted joints, and a comprehensive bibliography of current information on bolted joints.

  19. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    7 include annual weed distribution data (for selected species), annual weed control locations, biocontrol release locations, vegetation and wildlife monitoring locations (transect endpoints and sample points), vegetation community classifications, Preble's mouse habitat, wetland locations, wildfire/prescribed burn locations, Preble's mouse and wetland mitigation areas, and rare plant locations. These data are available in various ArcGIS-compatible formats. In addition to these types of spatial

  20. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    29 3.0 Environmental Monitoring 3.1 Water Monitoring 3.1.1 Introduction This section presents data collected to satisfy water monitoring objectives implemented at the Site in accordance with RFLMA Attachment 2, "Legacy Management Requirements," Table 2, "Water Monitoring Locations and Sampling Criteria." The RFSOG provides a guidance framework in support of conducting LM activities, including monitoring, at the Site. This annual report focuses on data collected during CY 2015

  1. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    262 Notes: Pie chart diameters are relative to total load. Figure 192. Relative Average Annual Total U Loads from Former IA Drainages and WWTP 3.1.5 Groundwater Data Interpretation and Evaluation This section provides a summary of groundwater monitoring performed in 2015. A discussion of groundwater conditions during 2015, focusing on the most important water-quality aspects in the areas of interest (i.e., the main contaminant plumes), is then presented. 3.1.5.1 RFLMA Groundwater Monitoring

  2. MHK Technologies/BOLT Lifesaver | Open Energy Information

    Open Energy Info (EERE)

    here Oscillating Wave Surge Converter Technology Readiness Level Click here TRL 7 8 Open Water System Testing Demonstration and Operation Technology Description Fred Olsen s BOLT...

  3. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  4. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance:technical maintenanceandcontent maintenance....

  5. High-speed plasma imaging: A lightning bolt

    SciTech Connect (OSTI)

    Wurden, G.A.; Whiteson, D.O.

    1996-02-01

    Using a gated intensified digital Kodak Ektapro camera system, the authors captured a lightning bolt at 1,000 frames per second, with 100-{micro}s exposure time on each consecutive frame. As a thunder storm approaches while darkness descended (7:50 pm) on July 21, 1994, they photographed lightning bolts with an f22 105-mm lens and 100% gain on the intensified camera. This 15-frame sequence shows a cloud to ground stroke at a distance of about 1.5 km, which has a series of stepped leaders propagating downwards, following by the upward-propagating main return stroke.

  6. U.S. Energy Information Administration | Electric Power Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual

  7. Evaluation of Roof Bolting Requirements Based on In-Mine Roof Bolter Drilling

    SciTech Connect (OSTI)

    Syd S. Peng

    2005-10-01

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on this information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. For the prediction of roof geology and stability condition in real time, a micro processor was used and a program developed to monitor and record the drilling parameters of roof bolter. These parameters include feed pressure, feed flow (penetration rate), rotation pressure, rotation rate, vacuum pressure, oil temperature of hydraulic circuit, and signals for controlling machine. From the results of a series of laboratory and underground tests so far, feed pressure is found to be a good indicator for identifying the voids/fractures and estimating the roof rock strength. The method for determining quantitatively the location and the size of void/fracture and estimating the roof rock strength from the drilling parameters of roof bolter was developed. Also, a set of computational rules has been developed for in-mine roof using measured roof drilling parameters and implemented in MRGIS (Mine Roof Geology Information System), a software package developed to allow mine engineers to make use of the large amount of roof drilling parameters for predicting roof geology properties automatically. For the development of roof bolting criteria, finite element models were developed for tensioned and fully grouted bolting designs. Numerical simulations were performed to investigate the mechanisms of modern roof bolting systems including both the tension and fully grouted bolts. Parameters to be studied are: bolt length, bolt spacing, bolt size/strength, grout annulus, in-situ stress condition, overburden depth, and roof geology (massive strata, fractured, and laminated or thinly-bedded). Based on the analysis of the mechanisms of both bolting systems and failure modes of the bolted strata, roof bolting design criteria and programs for modern roof bolting systems were developed. These criterion and/or programs were combined with the MRGIS for use in conjunction with roof bolt installation.

  8. Majorana Demonstrator Bolted Joint Mechanical and Thermal Analysis

    SciTech Connect (OSTI)

    Aguayo Navarrete, Estanislao; Reid, Douglas J.; Fast, James E.

    2012-06-01

    The MAJORANA DEMONSTRATOR is designed to probe for neutrinoless double-beta decay, an extremely rare process with a half-life in the order of 1026 years. The experiment uses an ultra-low background, high-purity germanium detector array. The germanium crystals are both the source and the detector in this experiment. Operating these crystals as ionizing radiation detectors requires having them under cryogenic conditions (below 90 K). A liquid nitrogen thermosyphon is used to extract the heat from the detectors. The detector channels are arranged in strings and thermally coupled to the thermosyphon through a cold plate. The cold plate is joined to the thermosyphon by a bolted joint. This circular plate is housed inside the cryostat can. This document provides a detailed study of the bolted joint that connects the cold plate and the thermosyphon. An analysis of the mechanical and thermal properties of this bolted joint is presented. The force applied to the joint is derived from the torque applied to each one of the six bolts that form the joint. The thermal conductivity of the joint is measured as a function of applied force. The required heat conductivity for a successful experiment is the combination of the thermal conductivity of the detector string and this joint. The thermal behavior of the joint is experimentally implemented and analyzed in this study.

  9. Post-Service Examination of PWR Baffle Bolts, Part I. Examination and Test Plan

    SciTech Connect (OSTI)

    Leonard, Keith J.; Sokolov, Mikhail A.; Gussev, Maxim N.

    2015-04-30

    In support of extended service and current operations of the US nuclear reactor plants, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Light Water Reactor Sustainability (LWRS) Program, is coordinating with Ginna Nuclear Power Plant, The Westinghouse Electric Company, LLC, and ATI Consulting, the selective procurement of baffle bolts that were withdrawn from service in 2011 and currently stored on site at Ginna. The goal of this program is to perform detailed microstructural and mechanical property characterization of baffle former bolts following in-service exposures. This report outlines the selection criteria of the bolts and the techniques to be used in this study. The bolts available are the original alloy 347 steel fasteners used in holding the baffle plates to the baffle former structures within the lower portion of the pressurized water reactor vessel. Of the eleven possible bolts made available for this work, none were identified to have specific damage. The bolts, however, did show varying levels of breakaway torque required in their removal. The bolts available for this study varied in peak fluence (highest dose within the head of the bolt) between 9.9 and 27.8x1021 n/cm2 (E>1MeV). As no evidence for crack initiation was determined for the available bolts from preliminary visual examination, two bolts with the higher fluence values were selected for further post-irradiation examination. The two bolts showed different breakaway torque levels necessary in their removal. The information from these bolts will be integral to the LWRS program initiatives in evaluating end of life microstructure and properties. Furthermore, valuable data will be obtained that can be incorporated into model predictions of long-term irradiation behavior and compared to results obtained in high flux experimental reactor conditions. The two bolts selected for the ORNL study will be shipped to Westinghouse with bolts of interest to their collaborative efforts with the Electric Power Research Institute. Westinghouse will section the ORNL bolts into samples specified in this report and return them to ORNL. Samples will include bend bars for fracture toughness and crack propagation studies along with thin sections from which specimens for bend testing, subscale tensile and microstructural analysis can be obtained. Additional material from the high stress concentration region at the transition between the bolt head and shank will also be preserved to allow for further investigation of possible crack initiation sites.

  10. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th...

  11. Heating and cooling gas-gun targets: nuts and bolts

    SciTech Connect (OSTI)

    Gustavsen, Richard L; Bartram, Brian D; Gehr, Russell J; Bucholtz, Scott M

    2009-01-01

    The nuts and bolts of a system used to heat and cool gas-gun targets is described. We have now used the system for more than 35 experiments, all of which have used electromagnetic gauging. Features of the system include a cover which is removed (remotely) just prior to projectile impact and the widespread use of metal/polymer insulations. Both the cover and insulation were required to obtain uniform temperatures in samples with low thermal conductivity. The use of inexpensive video cameras to make remote observations of the cover removal was found to be very useful. A brief catalog of useful glue, adhesive tape, insulation, and seal materials is given.

  12. Hydrogen embrittlement of cathodically protected subsea bolting alloys

    SciTech Connect (OSTI)

    Wolfe, L.H.; Burnette, C.C.; Joosten, M.W. )

    1993-07-01

    Normal operations of cathodic protection (CP) systems caused hydrogen embrittlement failures of subsea bolts made of Monel K-500 alloy (UNS N05500) on offshore platforms. Subsequent testing showed that the embrittlement could be predicted from cathodically protected slow strain rate tensile tests. Additional slow strain rate tests have shown that CP caused embrittlement of Ferralium 255 (S32550), Inconel X-750 (N07750), Inconel 718 (N07718), high strength steel, and 13% chromium alloys. Beryllium copper (C17200), A-286 steel (S66286), Beta-C titanium (R58640), and steel at a yield strength of 793 MPa (115 ksi) were not embrittled under the same conditions.

  13. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2001-10-15

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. The retrofitting works for a dedicated roof bolter for this research has been completed. The laboratory tests performed using this machine on simulated roof blocks have been conducted. The analysis performed on the testing data showed promising signs to detect the rock interface, fractures, as well as the rock types. The other tasks were progressing as planned.

  14. EVALUATION OF TROQUE VS CLOSURE BOLT PRELOAD FOR A TYPICAL CONTAINMENT VESSEL UNDER SERVICE CONDITIONS

    SciTech Connect (OSTI)

    Smith, A.

    2010-02-16

    Radioactive material package containment vessels typically employ bolted closures of various configurations. Closure bolts must retain the lid of a package and must maintain required seal loads, while subjected to internal pressure, impact loads and vibration. The need for insuring that the specified preload is achieved in closure bolts for radioactive materials packagings has been a continual subject of concern for both designers and regulatory reviewers. The extensive literature on threaded fasteners provides sound guidance on design and torque specification for closure bolts. The literature also shows the uncertainty associated with use of torque to establish preload is typically between 10 and 35%. These studies have been performed under controlled, laboratory conditions. The ability to insure required preload in normal service is, consequently, an important question. The study described here investigated the relationship between indicated torque and resulting bolt load for a typical radioactive materials package closure using methods available under normal service conditions.

  15. Performance of bolted closure joint elastomers under cask aging conditions

    SciTech Connect (OSTI)

    Verst, C.; Sindelar, R.; Skidmore, E.; Daugherty, W.

    2015-07-23

    The bolted closure joint of a bare spent fuel cask is susceptible to age-related degradation and potential loss of confinement function under long-term storage conditions. Elastomeric seals, a component of the joint typically used to facilitate leak testing of the primary seal that includes the metallic seal and bolting, is susceptible to degradation over time by several mechanisms, principally via thermo-oxidation, stress-relaxation, and radiolytic degradation under time and temperature condition. Irradiation and thermal exposure testing and evaluation of an ethylene-propylene diene monomer (EPDM) elastomeric seal material similar to that used in the CASTOR® V/21 cask for a matrix of temperature and radiation exposure conditions relevant to the cask extended storage conditions, and development of semiempirical predictive models for loss of sealing force is in progress. A special insert was developed to allow Compressive Stress Relaxation (CSR) measurements before and after the irradiation and/or thermal exposure without unloading the elastomer. A condition of the loss of sealing force for the onset of leakage was suggested. The experimentation and modeling being performed could enable acquisition of extensive coupled aging data as well as an estimation of the timeframe when loss of sealing function under aging (temperature/radiation) conditions may occur.

  16. Failures of nickel/copper bolts in subsea application

    SciTech Connect (OSTI)

    Wolfe, L.H.; Joosten, M.W.

    1988-08-01

    Slow-strain-rate tests in ASTM seawater using specimens prepared from a failed nickel/copper-alloy bolt have shown that precipitation-hardened UNS N05500 (Monel K-500) is embrittled by cathodic protection with sacrificial aluminum anodes. Some loss of ductility also occurred when annealed UNS N05500 was coupled to aluminum anodes and when the hardened alloy was coupled to steel. Brittle fractures produced by slow-strain-rate tests were intergranular and were very similar in appearance to the field fractures. While the slow-strain-rate tests were conducted on an alloy from only one source, there is no reason to assume that UNS N05500 alloy from other sources would resist hydrogen embrittlement from standard cathodic protection systems.

  17. Annual Reports - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    reports Annual Reports Annual Report 2015 Annual Report 2014 Annual Report 2013 Annual Report 2012 Annual Report 2011 Annual Report 2010 Annual Report 2009 Annual Report 2008...

  18. A Reduced Order Model of Force Displacement Curves for the Failure of Mechanical Bolts in Tension.

    SciTech Connect (OSTI)

    Moore, Keegan J.; Brake, Matthew Robert

    2015-12-01

    Assembled mechanical systems often contain a large number of bolted connections. These bolted connections (joints) are integral aspects of the load path for structural dynamics, and, consequently, are paramount for calculating a structure's stiffness and energy dissipation prop- erties. However, analysts have not found the optimal method to model appropriately these bolted joints. The complexity of the screw geometry causes issues when generating a mesh of the model. This report will explore different approaches to model a screw-substrate connec- tion. Model parameters such as mesh continuity, node alignment, wedge angles, and thread to body element size ratios are examined. The results of this study will give analysts a better understanding of the influences of these parameters and will aide in finding the optimal method to model bolted connections.

  19. WAPD-TM-1349 DOE RESEARCH AND DEVELOPMENT REPORT FORCES IN BOLTED...

    Office of Scientific and Technical Information (OSTI)

    ... B. Two Methods for Attaining Initial Rreload in LWBR .Core Assemblies , 1. Preload .by Control of Applied orque 2. Preload by Control of Bolt Head Rotation 3. Torque vs. ...

  20. Load apparatus and method for bolt-loaded compact tension test specimen

    DOE Patents [OSTI]

    Buescher, B.J. Jr.; Lloyd, W.R.; Ward, M.B.; Epstein, J.S.

    1997-02-04

    A bolt-loaded compact tension test specimen load apparatus includes: (a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; (b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; (c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and (d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen. 6 figs.

  1. Load apparatus and method for bolt-loaded compact tension test specimen

    DOE Patents [OSTI]

    Buescher, Jr., Brent J.; Lloyd, W. Randolph; Ward, Michael B.; Epstein, Jonathan S.

    1997-01-01

    A bolt-loaded compact tension test specimen load apparatus includes: a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen.

  2. Nonrotating, self-centering anchor assembly for anchoring a bolt in a borehole

    DOE Patents [OSTI]

    Bevan, J.E.; King, G.W.

    1998-12-08

    An expandable anchor assembly is provided for anchoring the threaded end portion of an elongated roof bolt in a borehole. The anchoring assembly includes a hollow outer sleeve in the form of a plurality of symmetrically arranged, longitudinal segmented wall portions with exterior gripping teeth and an inner expander sleeve in the form of a corresponding plurality of longitudinal wall portions symmetrically arranged about a central axis to define an inner threaded cylindrical section. The inner sleeve is captured within and moveable axially relative to the outer sleeve. As the threaded end portion of the elongated bolt is inserted into the inner threaded cylindrical section of the inner sleeve from the trailing end to the leading end thereof, the inner sleeve expands over and clamps around the threaded end portion of the elongated bolt. Thereafter, partial withdrawal of the elongated bolt from the borehole causes the inner sleeve to axially move relative to the outer sleeve from the leading end toward the trailing end of the outer sleeve in a wedging action to cause the outer sleeve to radially expand and force engagement of the gripping teeth against the sidewall of the borehole to thereby secure the expandable anchor assembly and therewith the threaded end portion of the elongated bolt within the borehole. 8 figs.

  3. Nonrotating, self-centering anchor assembly for anchoring a bolt in a borehole

    DOE Patents [OSTI]

    Bevan, John E.; King, Grant W.

    1998-01-01

    An expandable anchor assembly is provided for anchoring the threaded end portion of an elongated roof bolt in a borehole. The anchoring assembly includes a hollow outer sleeve in the form of a plurality of symmetrically arranged, longitudinal segmented wall portions with exterior gripping teeth and an inner expander sleeve in the form of a corresponding plurality of longitudinal wall portions symmetrically arranged about a central axis to define an inner threaded cylindrical section. The inner sleeve is captured within and moveable axially relative to the outer sleeve. As the threaded end portion of the elongated bolt is inserted into the inner threaded cylindrical section of the inner sleeve from the trailing end to the leading end thereof, the inner sleeve expands over and clamps around the threaded end portion of the elongated bolt. Thereafter, partial withdrawal of the elongated bolt from the borehole causes the inner sleeve to axially move relative to the outer sleeve from the leading end toward the trailing end of the outer sleeve in a wedging action to cause the outer sleeve to radially expand and force engagement of the gripping teeth against the sidewall of the borehole to thereby secure the expandable anchor assembly and therewith the threaded end portion of the elongated bolt within the borehole.

  4. Achieving uniform-high-tensions in mechanical-anchor bolts. Open file report, 15 January 1980-15 November 1981

    SciTech Connect (OSTI)

    Mahyera, A.; Jones, A.H.

    1982-11-01

    Towards the goal of achieving uniform high tensions in roofbolts to provide superior roof support for extended periods, mechanical anchor bolts were installed in a mine in eight different ways--under torque thrust control with and without hardened washers, belleville washers, and tension equalization; in a conventional manner with and without a hardened washer. The various bolt groups were analyzed in terms of tension uniformity and mean tension levels. Installing the bolts accurately with a hardened washer under the bolthead, and proper torque thrust control resulted in the most uniformly tensioned bolt--with a coefficient variation of only 14%, an improvement of three times over a conventional installation. Also, these bolts maintained a high tension level--80% of the installation tension compared with 50% achieved conventionally.

  5. Thermal conductance measurements of bolted copper joints for SuperCDMS

    SciTech Connect (OSTI)

    Schmitt, R.; Tatkowski, Greg; Ruschman, M.; Golwala, S. R.; Kellaris, N.; Daal, M.; Hall, Jeter C.; Hoppe, Eric W.

    2015-09-01

    Joint thermal conductance testing has been undertaken for bolted copper to copper connections from 60 mK to 26 K. This testing was performed to validate an initial design basis for the SuperCDMS experiment, where a dilution refrigerator will be coupled to a cryostat via multiple bolted connections. Copper used during testing was either gold plated or passivated with citric acid to prevent surface oxidation. Results obtained are well fit by a power law regression of joint thermal conductance to temperature and match well with data collected during a literature review.

  6. STRUCTURAL ANALYSES OF FUEL CASKS SUBJECTED TO BOLT PRELOAD, INTERNAL PRESSURE AND SEQUENTIAL DYNAMIC IMPACTS

    SciTech Connect (OSTI)

    Wu, T

    2009-06-25

    Large fuel casks subjected to the combined loads of closure bolt tightening, internal pressure and sequential dynamic impacts present challenges when evaluating their performance in the Hypothetical Accident Conditions (HAC) specified in the Code of Federal Regulations Title 10 Part 71 (10CFR71). Testing is often limited by cost, difficulty in preparing test units and the limited availability of facilities which can carry out such tests. In the past, many casks were evaluated without testing by using simplified analytical methods. In addition, there are no realistic analyses of closure bolt stresses for HAC conditions reported in the open literature. This paper presents a numerical technique for analyzing the accumulated damages of a large fuel cask caused by the sequential loads of the closure bolt tightening and the internal pressure as well as the drop and crash dynamic loads. The bolt preload and the internal pressure are treated as quasi-static loads so that the finite element method with explicit numerical integration scheme based on the theory of wave propagation can be applied. The dynamic impacts with short durations such as the 30-foot drop and the 40-inch puncture for the hypothetical accident conditions specified in 10CFR71 are also analyzed by using the finite-element method with explicit numerical integration scheme.

  7. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  8. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  9. CRAD, NNSA- Maintenance (MN)

    Office of Energy Efficiency and Renewable Energy (EERE)

    CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  10. CRAD, Maintenance Assessment Plan

    Broader source: Energy.gov [DOE]

    An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

  11. Parameters affecting resin-anchored cable bolt performance: Results of in situ evaluations

    SciTech Connect (OSTI)

    Zelanko, J.C.; Mucho, T.P.; Compton, C.S.; Long, L.E.; Bailey, P.E.

    1995-11-01

    Cable bolt support techniques, including hardware and anchorage systems, continue to evolve to meet US mining requirements. For cable support systems to be successfully implemented into new ground control areas, the mechanics of this support and the potential range of performance need to be better understood. To contribute to this understanding, a series of 36 pull tests were performed on 10 ft long cable bolts using various combinations of hole diameters, resin formulations, anchor types, and with and without resin dams. These test provided insight as to the influence of these four parameters on cable system performance. Performance was assessed in terms of support capacity (maximum load attained in a pull test), system stiffness (assessed from two intervals of load-deformation), and from the general load-deformation response. Three characteristic load-deformation responses were observed. An Analysis of Variance identified a number of main effects and interactions of significance to support capacity and stiffness. The factorial experiment performed in this study provides insight to the effects of several design parameters associated with resin-anchored cable bolts.

  12. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  13. Sustaining the National Geothermal Data System: Considerations for a System Wide Approach and Node Maintenance, Geothermal Resources Council 37th Annual Meeting, Las Vegas, Nevada, September 29-October 2, 2013

    SciTech Connect (OSTI)

    Allison, Lee; Chickering, Cathy; Anderson, Arlene; Richard, Stephen M.

    2013-09-23

    Since the 2009 American Recovery and Reinvestment Act the U.S. Department of Energy’s Geothermal Technologies Office has funded $33.7 million for multiple data digitization and aggregation projects focused on making vast amounts of geothermal relevant data available to industry for advancing geothermal exploration. These projects are collectively part of the National Geothermal Data System (NGDS), a distributed, networked system for maintaining, sharing, and accessing data in an effort to lower the levelized cost of electricity (LCOE). Determining “who owns” and “who maintains” the NGDS and its data nodes (repositories in the distributed system) is yet to be determined. However, the invest- ment in building and populating the NGDS has been substantial, both in terms of dollars and time; it is critical that this investment be protected by ensuring sustainability of the data, the software and systems, and the accessibility of the data. Only then, will the benefits be fully realized. To keep this operational system sustainable will require four core elements: continued serving of data and applications; maintenance of system operations; a governance structure; and an effective business model. Each of these presents a number of challenges. Data being added to the NGDS are not strictly geothermal but data considered relevant to geothermal exploration and develop- ment, including vast amounts of oil and gas and groundwater wells, among other data. These are relevant to a broader base of users. By diversifying the client base to other users and other fields, the cost of maintaining core infrastructure can be spread across an array of stakeholders and clients. It is presumed that NGDS will continue to provide free and open access to its data resources. The next-phase NGDS operation should be structured to eventually pursue revenue streams to help off-set sustainability expenses as necessary and appropriate, potentially including income from: grants and contracts (agencies, foundations, pri- vate sector), membership, fees for services (consulting, training, customization, ‘app’ development), repository services (data, services, apps, models, documents, multimedia), advertisements, fees for premier services or applications, subscriptions to value added services, licenses, contributions and donations, endow- ments, and sponsorships.

  14. Step 5: Operations and Maintenance

    Energy Savers [EERE]

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  15. Testing of nuclear grade lubricants and their effects on A540 B24 and A193 B7 bolting materials

    SciTech Connect (OSTI)

    Czajkowski, C.J.

    1985-01-01

    An investigation was performed on eleven commonly used lubricants by the nuclear power industry. The investigation included EDS analysis of the lubricants, notched-tensile constant extension rate testing of bolting materials with the lubricants, frictional testing of the lubricants and weight loss testing of a bonded solid film lubricant. The report generally concludes that there is a significant amount of variance in the mechanical properties of common bolting materials; that MoS/sub 2/ can hydrolyze to form H/sub 2/S at 100/sup 0/C and cause stress corrosion cracking (SCC) of bolting materials, and that the use of copper-containing lubricants can be potentially detrimental to high strength steels in an aqueous environment. Additionally, the testing of various lubricants disclosed that some lubricants contain potentially detrimental elements (e.g. S, Sb) which can promote SCC of the common bolting materials. One of the most significant findings of this report is the observation that both A193 B7 and A540 B24 bolting materials are susceptible to transgranular stress corrosion cracking in demineralized H/sub 2/O at 280/sup 0/C in notched tensile tests.

  16. Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status & Schedules » Annual Planning Summaries Annual Planning Summaries Background DOE Order 451.1B, National Environmental Compliance Program, Section 4.d, requires that an annual NEPA planning summary will describe briefly: (1) the status of ongoing NEPA compliance activities, (2) any environmental assessments expected to be prepared in the next 12 months, (3) any environmental impact statements expected to be prepared in the next 24 months, and (4) the planned cost and schedule for

  17. Microsoft Word - S08568_CY2011 Annual Rpt

    Office of Legacy Management (LM)

    1 April 2012 LMS/RFS/S08568 This page intentionally left blank LMS/RFS/S08568 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2011 April 2012 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2011 April 2012 Doc. No. S08568 Page i Contents Abbreviations

  18. Microsoft Word - S09641_2012Annual.docx

    Office of Legacy Management (LM)

    2 April 2013 LMS/RFS/S09641 This page intentionally left blank LMS/RFS/S09641 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2012 April 2013 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2012 April 2013 Doc. No. S09641 Page i Contents Abbreviations

  19. Microsoft Word - S11432_2013Annual Rpt.docx

    Office of Legacy Management (LM)

    Rocky Flats, Colorado, Site Calendar Year 2013 April 2014 LMS/RFS/S11432 This page intentionally left blank LMS/RFS/S11432 Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2013 April 2014 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2013 April 2014 Doc. No. S11432 Page i Contents Abbreviations

  20. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

    We would like to inform the OpenEI community that OpenEI will be...

  1. Operations and Maintenance Best Practices Guide | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide The Federal Energy Management Program's Operations and Maintenance (O&M) Best ...

  2. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday,...

  3. CX_00073_CHPRC_Annual_Routine_Maintenance.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  4. Microsoft Word - S05993_CY2009 Annual Rpt.doc

    Office of Legacy Management (LM)

    Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2009 April 2010 LMS/RFS/S05993 This page intentionally left blank LMS/RFS/S05993 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2009 April 2010 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2009 April

  5. Microsoft Word - S07121_CY2010 Annual Rpt

    Office of Legacy Management (LM)

    of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2010 April 2011 LMS/RFS/S07121 This page intentionally left blank LMS/RFS/S07121 U.S. Department of Energy Office of Legacy Management Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2010 April 2011 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY

  6. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  7. Monitoring of bolted joints using piezoelectric active-sensing for aerospace applications

    SciTech Connect (OSTI)

    Park, Gyuhae; Farrar, Charles R; Park, Chan - Yik; Jun, Seung - Moon

    2010-01-01

    This paper is a report of an initial investigation into tracking and monitoring the integrity of bolted joints using piezoelectric active-sensors. The target application of this study is a fitting lug assembly of unmanned aerial vehicles (UAVs), where a composite wing is mounted to a UAV fuselage. The SHM methods deployed in this study are impedance-based SHM techniques, time-series analysis, and high-frequency response functions measured by piezoelectric active-sensors. Different types of simulated damage are introduced into the structure, and the capability of each technique is examined and compared. Additional considerations encountered in this initial investigation are made to guide further thorough research required for the successful field deployment of this technology.

  8. Annual Report

    Energy Savers [EERE]

    1 2011 Annual Report to the Oak Ridge Community Annual Report to the Oak Ridge Community DOE/ORO/2399 Progress Cleanup P Progress Cleanup P 2 This report was produced by URS | CH2M Oak Ridge LLC, DOE's Environmental Management contractor for the Oak Ridge Reservation. About the Cover After recontouring and revegetation, the P1 Pond at East Tennessee Technology Park is flourishing. The contaminated pond was drained, recontoured, and restocked with fish that would not disturb the pond sediment. 1

  9. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  10. DOE/IG Annual Performance Report FY 2008, Annual Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report ...

  11. Upcoming BPAT Systems Maintenance Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming-BPAT-Systems-Maintenance-Events Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer...

  12. US Department of Energy - Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Howdy fellow energy adventurer Energy.gov is currently undergoing routine maintenance that will make it even more awesome. Please try again in a few minutes. We...

  13. Tim Kuneli, Electronics Maintenance Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

  14. Petroleum Marketing Annual Archives

    U.S. Energy Information Administration (EIA) Indexed Site

    Petrolem Reports Petroleum Marketing Annual Archives The Petroleum Marketing Annual was discontinued in 2010. Choose the year from the archive Petroleum Marketing Annual you wish...

  15. Resolution of Surveillance Report No. PAD-BDW-95-004 for suspect bolts installed in the 105 KW roof addition structure

    SciTech Connect (OSTI)

    Frier, W.A.

    1995-04-14

    A DOE RL surveillance determined that a test report (WHC-SD-NR-TRP-020) was less than adequate. As a result, WHC removed nine of the previous in-situ tested A325 suspect bolts and contracted with Koon-Hall Testing Corporation to perform hardness and tensile testing and chemical composition analysis of the removed bolts. WHC also contracted with ADVENT Engineering, Inc., to perform an evaluation of the Koon-Hall test results and to respond to the concerns identified in the DOE RL surveillance. The Koon-Hall Laboratory test results and the assessments strongly support the conclusion that the suspect bolts are indeed the equivalent of A325 high-strength, Type-1 bolts and have been properly heat-treated.

  16. Web Maintenance Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Requirements Web Maintenance Requirements The Office of Energy Efficiency and Renewable Energy (EERE) expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance. Websites that are no longer being maintained should be archived. Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web Coordinators should ensure these tasks

  17. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  18. 2006 Annual Inspection for the

    Office of Legacy Management (LM)

    3 UMTRCA Title I Annual Report March 2014 Durango, Colorado Page 4-1 4.0 Durango, Colorado, Disposal Site 4.1 Compliance Summary The Durango, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site, inspected on May 21, 2013, was in excellent condition. Vegetation on top of the disposal cell remains healthy, and the top and side slopes remain relatively free of deep-rooted species. A gap in the retention pond fence was repaired. No additional maintenance needs or

  19. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011

    SciTech Connect (OSTI)

    2012-03-01

    This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

  20. Application of viscous and Iwan modal damping models to experimental measurements from bolted structures

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Deaner, Brandon J.; Allen, Matthew S.; Starr, Michael James; Segalman, Daniel J.; Sumali, Hartono

    2015-01-20

    Measurements are presented from a two-beam structure with several bolted interfaces in order to characterize the nonlinear damping introduced by the joints. The measurements (all at force levels below macroslip) reveal that each underlying mode of the structure is well approximated by a single degree-of-freedom (SDOF) system with a nonlinear mechanical joint. At low enough force levels, the measurements show dissipation that scales as the second power of the applied force, agreeing with theory for a linear viscously damped system. This is attributed to linear viscous behavior of the material and/or damping provided by the support structure. At larger forcemore » levels, the damping is observed to behave nonlinearly, suggesting that damping from the mechanical joints is dominant. A model is presented that captures these effects, consisting of a spring and viscous damping element in parallel with a four-parameter Iwan model. As a result, the parameters of this model are identified for each mode of the structure and comparisons suggest that the model captures the stiffness and damping accurately over a range of forcing levels.« less

  1. Application of viscous and Iwan modal damping models to experimental measurements from bolted structures

    SciTech Connect (OSTI)

    Deaner, Brandon J.; Allen, Matthew S.; Starr, Michael James; Segalman, Daniel J.; Sumali, Hartono

    2015-01-20

    Measurements are presented from a two-beam structure with several bolted interfaces in order to characterize the nonlinear damping introduced by the joints. The measurements (all at force levels below macroslip) reveal that each underlying mode of the structure is well approximated by a single degree-of-freedom (SDOF) system with a nonlinear mechanical joint. At low enough force levels, the measurements show dissipation that scales as the second power of the applied force, agreeing with theory for a linear viscously damped system. This is attributed to linear viscous behavior of the material and/or damping provided by the support structure. At larger force levels, the damping is observed to behave nonlinearly, suggesting that damping from the mechanical joints is dominant. A model is presented that captures these effects, consisting of a spring and viscous damping element in parallel with a four-parameter Iwan model. As a result, the parameters of this model are identified for each mode of the structure and comparisons suggest that the model captures the stiffness and damping accurately over a range of forcing levels.

  2. Annual Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    09 THROUGH 09/30/2010 The following Annual Freedom of Information Act report covers the Period 10/01/2009, through 09/30/2010, as required by 5 U.S.C. 552. I. BASIC INFORMATION REGARDING REPORT 1. Kevin T. Hagerty, Director Office of Information Resources, MA-90 U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 202-586-5955 Alexander Morris, FOIA Officer Sheila Jeter, FOIA/Privacy Act Specialist FOIA Office, MA-90 Office of Information Resources U.S. Department of Energy

  3. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  4. Requirements Based Surveillance and Maintenance Review Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based ...

  5. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  6. Efficiency Lighting & Maintenance Inc | Open Energy Information

    Open Energy Info (EERE)

    & Maintenance Inc Jump to: navigation, search Name: Efficiency Lighting & Maintenance Inc Address: 5a Del Mar Drive Place: Brookfield, Connecticut Zip: 06804 Region: Northeast - NY...

  7. Geothermal Data Development, Collection, and Maintenance | Open...

    Open Energy Info (EERE)

    Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading...

  8. Maintenance Planner | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance Planner Department: Facilities Requisition Number: 1501075 Position Summary: This multi-trade Maintenance Planner position will enhance the Lab's Facilities Division...

  9. Oregon Department of Transportation - Maintenance and Operations...

    Open Energy Info (EERE)

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  10. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spring Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air ...

  11. Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2005 Annual Operation Plan, 2004 Annual Report.

    SciTech Connect (OSTI)

    Harty, Harold R.; Lundberg, Jeffrey H.; Penney, Aaron K.

    2005-02-01

    The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

  12. Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2004 Annual Operation Plan, 2003 Annual Report.

    SciTech Connect (OSTI)

    Harty, Harold R.; Penney, Aaron K.; Larson, Roy Edward

    2005-12-01

    The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

  13. Annual Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Reports Annual Reports Note: Some of the following documents are in PDF and will require Adobe Reader for viewing. Freedom of Information Act Annual Reports Annual Report for 2015 Annual Report for 2014 Annual Report for 2013 Annual Report for 2012 Annual Report for 2011 Annual Report for 2010 Annual Report for 2009 Annual Report for 2008 (pdf) Annual Report for 2007 (pdf) Annual Report for 2006 (pdf) Annual Report for 2005 (pdf) Annual Report for 2004 (pdf) Annual Report for 2003 (pdf)

  14. Microsoft Word - S05993_CY2009 Annual Rpt.doc

    Office of Legacy Management (LM)

    2-1 2.0 Site Operations and Maintenance 2.1 Annual Site Inspection Evidence of significant erosion and IC violations must be inspected for annually, in accordance with RFLMA Attachment 2, Sections 5.3.4 and 5.3.6. The 2009 inspection was conducted on March 25 and reported in the Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities First Quarter Calendar Year 2009 (DOE 2008f). The following categories were monitored during the inspection: * Evidence of significant

  15. Microsoft Word - S07121_CY2010 Annual Rpt

    Office of Legacy Management (LM)

    7 2.0 Site Operations and Maintenance 2.1 Annual Site Inspection Evidence of significant erosion and IC violations must be inspected for annually, in accordance with RFLMA Attachment 2, Sections 5.3.4 and 5.3.6. The 2010 inspection was conducted on March 17, 2010, and reported in the Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities First Quarter Calendar Year 2010 (DOE 2010c). The following categories were monitored during the inspection: * Evidence of

  16. Microsoft Word - S08568_CY2011 Annual Rpt

    Office of Legacy Management (LM)

    9 2.0 Site Operations and Maintenance 2.1 Annual Site Inspection Evidence of significant erosion and IC violations must be inspected for annually, in accordance with RFLMA Attachment 2, Sections 5.3.4 and 5.3.6. The 2011 inspection was conducted on March 15, 2011, and reported in the Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities, First Quarter Calendar Year 2011 (DOE 2011e). The following categories were monitored during the inspection: * Evidence of

  17. Microsoft Word - S09641_2012Annual.docx

    Office of Legacy Management (LM)

    7 2.0 Site Operations and Maintenance 2.1 Annual Site Inspection Evidence of significant erosion and IC violations must be inspected for annually, in accordance with RFLMA Attachment 2, Sections 5.3.4 and 5.3.6. The 2012 inspection was conducted on March 12, 2012, and reported in the Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities, First Quarter Calendar Year 2012 (DOE 2012b). The following categories were monitored during the inspection:  Evidence of

  18. Microsoft Word - S11432_2013Annual Rpt.docx

    Office of Legacy Management (LM)

    9 2.0 Site Operations and Maintenance 2.1 Annual Site Inspection Evidence of significant erosion and IC violations must be inspected for annually, in accordance with RFLMA Attachment 2, Sections 5.3.4 and 5.3.6. The 2013 inspection was conducted on March 19, 2013, and reported in the Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities, First Quarter Calendar Year 2013 (DOE 2013f). The following categories were monitored during the inspection:  Evidence of

  19. Microsoft Word - S12421_2014 Annual Rpt.docx

    Office of Legacy Management (LM)

    9 2.0 Site Operations and Maintenance 2.1 Annual Site Inspection Evidence of significant erosion and IC violations must be inspected for annually, in accordance with RFLMA Attachment 2, Sections 5.3.4 and 5.3.6. The 2014 inspection was conducted on March 25, 2014, and reported in the Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities, First Quarter Calendar Year 2014 (DOE 2014d). The following condition categories were monitored during the inspection:  Evidence

  20. "Annual Coal Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual Coal Report Data Released: January 20, 2015 Data for: 2013 Re-Release Date: April 23, 2015 (CORRECTION) Annual Coal Report 2013 CorrectionUpdate April 23, 2015 The Annual ...

  1. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J.

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  3. Stress-corrosion cracking and surface-pitting tests of NiCrFe alloy bolts (LWBR development program)

    SciTech Connect (OSTI)

    Keller, K.L.

    1983-02-01

    Accelerated corrosion tests confirmed the adequate resistance to stress corrosion cracking (SCC) of the specific heats of NiCrFe X-750 and NiCrFe 600 used as bolts in the LWBR. SCC acceleration was achieved by running autoclave corrosion tests at 680/sup 0/F (well above the LWBR core operating temperatures of approximately 525/sup 0/F to 560/sup 0/F). Component stress levels were representative of maximum service stresses. No specimens from heats of either alloy suffered SCC.

  4. Petroleum Marketing Annual 2009

    U.S. Energy Information Administration (EIA) Indexed Site

    Petroleum Marketing Annual 2009 Released: August 6, 2010 Next Release Date: Discontinued find annual data in Petroleum Marketing Monthly Monthly price and volume statistics on...

  5. Petroleum Marketing Annual

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    PDF 1.2MB . Front Matter . Petroleum Marketing Annual Cover Page, Preface, and Table of Contents PDF . Highlights . Petroleum Marketing Annual Highlights PDF . . Summary Statistics ...

  6. Petroleum Marketing Annual

    Gasoline and Diesel Fuel Update (EIA)

    PDF 2.9MB . . Front Matter . Petroleum Marketing Annual Cover Page, Contacts, Preface, and Table of Contents PDF . . Highlights . Petroleum Marketing Annual Highlights PDF . . ...

  7. Petroleum Marketing Annual 1997

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    PDF 1.2MB . . Front Matter . Petroleum Marketing Annual Cover Page, Contacts, Preface, and Table of Contents PDF . . Highlights . Petroleum Marketing Annual Highlights PDF . . ...

  8. Annual Coal Distribution Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Coal Distribution Report Release Date: April 16, 2015 | Next Release Date: March 2016 | full report | RevisionCorrection Revision to the Annual Coal Distribution Report ...

  9. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  10. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010

    SciTech Connect (OSTI)

    2011-03-01

    This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

  11. Drive alignment pays maintenance dividends

    SciTech Connect (OSTI)

    Fedder, R.

    2008-12-15

    Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

  12. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  13. 2008 Annual Report

    SciTech Connect (OSTI)

    2008-01-01

    This annual report includes: a brief overview of Western; FY 2008 operational highlights; and financial data.

  14. NERSC Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Reports NERSC Annual Reports Sort by: Default | Name 2014cover.jpg NERSC Annual Report 2014 Download Image: 2014cover.jpg | jpg | 202 KB Download File: 2014NERSCAnnualReport.pdf | pdf | 6.1 MB 2013-Annual-Report-cover.png NERSC Annual Report 2013 Download Image: 2013-Annual-Report-cover.png | png | 645 KB Download File: annrep2013.pdf | pdf | 6.7 MB 2012-Cover.png NERSC Annual Report 2012 Download Image: 2012-Cover.png | png | 420 KB Download File: annrep12.pdf | pdf | 38 MB

  15. Annual report, October 1, 1979-September 30, 1980

    SciTech Connect (OSTI)

    Not Available

    1981-05-01

    This annual report covers research progress on each of the following areas: (1) PLT device, (2) PDX, (3) spheromak, (4) smaller devices, (5) theory, (6) TFTR, (7) applied physics, (8) TFTR blanket module experiments, (9) advanced toroidal facility, (10) advanced projects design and analysis, (11) engineering, and (12) fabrication, operations and maintenance. (MOW)

  16. Microsoft Word - S12421_2014 Annual Rpt.docx

    Office of Legacy Management (LM)

    Flats, Colorado, Site Calendar Year 2014 April 2015 LMS/RFS/S12421 This page intentionally left blank U.S. Department of Energy Rocky Flats Annual Report of Site Surveillance and Maintenance Activities-CY 2014 April 2015 Doc. No. S12421 Page i Contents Abbreviations .................................................................................................................................xv Executive Summary

  17. Annual Review | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ON-SITE RESEARCH PUBLICATIONS Annual Reviews FY13 Annual Review FY12 Annual Review FY11 Annual Review...

  18. DROP TESTS RESULTS OF REVISED CLOSURE BOLT CONFIGURATION OF THE STANDARD WASTE BOX, STANDARD LARGE BOX 2, AND TEN DRUM OVERPACK PACKAGINGS

    SciTech Connect (OSTI)

    May, C.; Opperman, E.; Mckeel, C.

    2010-04-15

    The Transuranic (TRU) Disposition Project at Savannah River Site will require numerous transfers of radioactive materials within the site boundaries for sorting and repackaging. The three DOT Type A shipping packagings planned for this work have numerous bolts for securing the lids to the body of the packagings. In an effort to reduce operator time to open and close the packages during onsite transfers, thus reducing personnel exposure and costs, an evaluation was performed to analyze the effects of reducing the number of bolts required to secure the lid to the packaging body. The evaluation showed the reduction to one-third of the original number of bolts had no effect on the packagings capability to sustain vibratory loads, shipping loads, internal pressure loads, and the loads resulting from a 4-ft drop. However, the loads caused by the 4-ft drop are difficult to estimate and the study recommended each of the packages be dropped to show the actual effects on the package closure. Even with reduced bolting, the packagings were still required to meet the 49 CFR 178.350 performance criteria for Type A packaging. This paper discusses the effects and results of the drop testing of the three packagings.

  19. Annual Performance Report FY 2005 Annual Performance Plan FY 2006 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 PDF icon Annual Performance Report FY 2005 Annual Performance Plan FY 2006 More Documents & Publications U.S. Department of Energy 2006 Annual Report FTCP Annual Plan - Fiscal Year 2005 FY 2008 E-Government Act Report

  20. Operations and Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Operations and Maintenance Operations and Maintenance Photo of a man, wearing a yellow hard hat, looking at a wall with panels and wires mounted to it. Lower ...

  1. Preventive Maintenance Strategies for Compressed Air Systems

    Broader source: Energy.gov [DOE]

    This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

  2. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming...

  5. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Update on maintenance and service costs of commercial building ground-source heat pump systems

    SciTech Connect (OSTI)

    Cane, D.; Garnet, J.M.

    2000-07-01

    An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

  18. NERSC Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Annual Reports NERSC Annual Reports Sort by: Default | Name anrep2000.png NERSC Annual Report 2000 Download Image: anrep2000.png | png | 203 KB Download File: NERSCAnnualReport2000.pdf | pdf | 4.9 MB anrep2001.png NERSC Annual Report 2001 Download Image: anrep2001.png | png | 175 KB Download File: annrep01.pdf | pdf | 7.1 MB anrep2002.png NERSC Annual Report 2002 Download Image: anrep2002.png | png | 55 KB Download File: annrep02.pdf | pdf | 3.4 MB anrep2003.png NERSC Annual Report 2003

  19. Solar Water Heating System Maintenance and Repair | Department...

    Energy Savers [EERE]

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | ...

  20. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  1. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford.gov will be undergoing scheduled upgrades and will be unavailable from 7:00 am Saturday, April 16th, 2016 until 5:00pm Sunday, April 17th, 2016. All Hanford.gov websites and web applications will be unavailable during this upgrade. Questions and inquiries regarding this maintenance outage please

  2. LNG Annual Report - 2006 | Department of Energy

    Energy Savers [EERE]

    6 LNG Annual Report - 2006 LNG Annual Report - 2006 PDF icon LNG Annual Report - 2006 More Documents & Publications LNG Annual Report - 2007 LNG Annual Report - 2008

  3. LNG Annual Report - 2010 | Department of Energy

    Energy Savers [EERE]

    10 LNG Annual Report - 2010 LNG Annual Report - 2010 PDF icon LNG Annual Report - 2010 More Documents & Publications LNG Annual Report - 2009 LNG Annual Report - 2008

  4. OHA 2008 ANNUAL REPORT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 ANNUAL REPORT OHA 2008 ANNUAL REPORT PDF icon OHA 2008 ANNUAL REPORT FINAL More Documents & Publications OHA 2007 ANNUAL REPORT OHA 2009 ANNUAL REPORT OHA 2015

  5. Annual Performance Report FY 2012, Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, Annual Performance Plan FY 2013 & FY 2014 Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY 2014 PDF icon Annual Performance Report and Plan FY12 FY13 FY14 ...

  6. ARM - Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MaterialsAnnual Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library...

  7. Annual Reports - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Reports Soil & Groundwater Home Annual Reports Environmental Data Access Administrative Record Annual Reports Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size NEW The Groundwater Remediation Project issues an annual report describing its accomplishments and plans. The projects associated with the Groundwater Remediation Project also issue periodic status reports. Those reports can be found in this section. Title Issue Date Rev. Document Information 2014

  8. NASEO 2015 Annual Meeting

    Broader source: Energy.gov [DOE]

    The National Association of State Energy Officials (NASEO) Annual Meeting will be held in San Diego, California.

  9. Annual Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Annual Site Environmental Report Updated July 24, 2015 NETL's Annual Site Environmental Report for 2014 -ii- 2014 Annual Site Environmental Report September 9, 2015 U.S. Department of Energy National Energy Technology Laboratory Albany, Oregon Anchorage, Alaska Morgantown, West Virginia Pittsburgh, Pennsylvania Sugar Land, Texas NETL's Annual Site Environmental Report for 2014 -iii- Disclaimer This report was prepared as an account of work sponsored by an agency of the U.S. Government.

  10. 2012 Annual Plan | Department of Energy

    Energy Savers [EERE]

    Annual Plan 2012 Annual Plan Section 999: 2012 Annual Plan PDF icon Section 999 - 2012 Annual Plan More Documents & Publications 2011 Annual Plan Sec. 999 Annual Plan 2012 2013 Annual Plan

  11. Draft 2014 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan PDF icon Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013 Annual Plan Sec. 999 Annual Plan 2012

  12. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  13. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  14. NERI 2004 Annual Report

    SciTech Connect (OSTI)

    2004-01-01

    The United States Department of Energy (DOE) created the Nuclear Energy Research Initiative (NERI) in Fiscal Year (FY) 1999 in response to recommendations provided by the President's Committee of Advisors on Science and Technology. The purpose of NERI is to sponsor research and development (R&D) in the nuclear energy sciences to address the principal barriers to the future use of nuclear energy in the United States. NERI is helping to preserve the nuclear science and engineering infrastructure within the Nation's universities, laboratories, and industry, and is advancing the development of nuclear energy technology, enabling the United States to maintain a competitive position in nuclear science and technology. Research under this initiative also addresses issues associated with the maintenance of existing U.S. nuclear plants. The NERI program is managed and funded by DOE's Office of Nuclear Energy, Science and Technology. ''The Nuclear Energy Research Initiative 2004 Annual Report'' serves to inform interested parties of progress made in NERI on a programmatic level as well as research progress made on individual NERI projects. Section 2 of this report provides background on the creation and implementation of NERI and on the focus areas for NERI research. Section 3 provides a discussion on NERI's mission, goals and objectives, and work scope. Section 4 highlights the major accomplishments of the NERI projects and provides brief summaries of the NERI research efforts that were completed in 2004. Section 5 provides a discussion on the impact NERI has had on U.S. university nuclear programs. Sections 6 through 8 provide project status reports by research area for each of the fiscal year (FY) 2001 and 2002 projects that were active in FY 2004. Research objectives, progress made over the last year, and activities planned for the next year are described for each project. Sections 9 through 11 present each of the newly awarded 2005 NERI projects in their corresponding focus area. Each abstract includes a brief description of the project, its proposed work scope, and its participants. Project numbers are designated by the FY in which the award was made. At the end of the document, there is an Index of NERI Projects grouped by FY and sequentially ordered by project number.

  15. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  16. FAQS Reference Guide – Facility Maintenance Management

    Broader source: Energy.gov [DOE]

    This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

  17. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  18. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  19. Fossil plant maintenance optimization at FPC`s Crystal River Units 4 & 5

    SciTech Connect (OSTI)

    Cossey, J.; Pflasterer, R.; Colsher, R.; Toomey, G.; Smith, S.; Abbott, P.

    1996-07-01

    Florida Power Corporation recently completed a Fossil Plant Maintenance Optimization project at it`s Crystal River Units 4 and 5 coal fired power plant. The project combined Streamlined Reliability Centered Maintenance (SRCM) techniques with a Predictive Maintenance (PDM) Assessment to analyze eleven of the plants systems that represent the principal contributors to maintenance costs. The plant had an extensive existing maintenance program that included several types of condition monitoring. The Benefit-to-Cost analysis indicates that the annual savings associated with the project recommendations result in a payback period of less than one year. This paper summarizes the types of recommendations that were made and describes the processes used for both the SRCM analysis and the PDM Assessment. The SRCM analysis used proven techniques and software that have been used on other projects, including some sponsored by EPRI. The PDM Assessment process was similar to processes used previously for EPRI and non- EPRI utilities; however, this was the first project where the two processes were modified to take advantage of work performed using the other. All of the recommendations developed by the SRCM analysts were reviewed by the PDM analysts before they were finalized. The structure and flow of the project is also described including how the SRCM and PDM analysts interfaced with the plant staff and how implementation was facilitated. The analysis relied on plant experience related to the operation and maintenance history of the equipment. The recommendations for each system were reviewed by a team consisting of the first-line maintenance supervisors, the maintenance planners, and the plant technical services group. The project recommendations are essentially two-thirds implemented, with many of them implemented before the analysis was completed.

  20. Annual Site Environmental Report

    Energy Savers [EERE]

    Department of Energy Annual Reports to Congress on Federal Government Energy Management Annual Reports to Congress on Federal Government Energy Management Annual reports on federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities

  1. NUG Annual Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NUGEX Elections Charter User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home » For Users » NERSC Users Group » Annual Meetings NUG Annual Meetings NUG holds annual face-to-face meetings. The annual

  2. 2007 Annual Report

    SciTech Connect (OSTI)

    2007-01-01

    This annual report includes: a brief overview of Western; FY 2007 highlights; FY 2007 Integrated Resource Planning, or IRP, survey; and financial data.

  3. EMSL 2009 Annual Report

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

    2010-02-26

    The EMSL 2009 Annual Report describes the science conducted at EMSL during 2009 as well as outreach activities and awards and honors received by users and staff.

  4. OPSI Annual Meeting

    Broader source: Energy.gov [DOE]

    The Organization of PJM States, Inc. (OPSI) is hosting its annual meeting in Chicago, IL, on October 13-14, 2014.

  5. Current Annualized Request

    Office of Environmental Management (EM)

    Appropriation FY 2012 FY 2013 FY 2014 Current Annualized Request CR % Energy And Water Development, And Related Agencies Energy Programs Energy Efficiency and Renewable Energy...

  6. FEOSH Annual Safety Training

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has developed an annual safety training course that is mandatory for all current DOE Federal employees and for each new hire.

  7. Historical Natural Gas Annual

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    6 The Historical Natural Gas Annual contains historical information on supply and disposition of natural gas at the national, regional, and State level as well as prices at...

  8. Historical Natural Gas Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    7 The Historical Natural Gas Annual contains historical information on supply and disposition of natural gas at the national, regional, and State level as well as prices at...

  9. Historical Natural Gas Annual

    Gasoline and Diesel Fuel Update (EIA)

    8 The Historical Natural Gas Annual contains historical information on supply and disposition of natural gas at the national, regional, and State level as well as prices at...

  10. SPEER Third Annual Summit

    Broader source: Energy.gov [DOE]

    The South-Central Partnership for Energy Efficiency as a Resource (SPEER) is hosting their 3rd Annual Summit in Dallas, Texas.

  11. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent receives...

  12. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

  13. BPA 2002 Annual Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    STATEMENTS 2002 Annual Report of the Bonneville Power Administration Cover photo BPA fish biologist Andy Thoms (upper right) works with students from H.B. Lee Middle School...

  14. Historical Natural Gas Annual

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Historical Natural Gas Annual . 1996 Published October 1997 1997 Published October 1998 1998 Published October 1999 1999 Published October 2000 2000 Published December 2001

  15. Annual Energy Outlook2014

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    For further information . . . The Annual Energy Outlook 2014 (AEO2014) was prepared by the U.S. Energy Information Administration (EIA), under the direction of John J. Conti...

  16. NRECA Annual Meeting

    Broader source: Energy.gov [DOE]

    The National Rural Electric Cooperative Association (NRECA) is hosting its annual conference in Orlando, FL, on Feb. 19-27, 2015.

  17. OPSI Annual Meeting

    Broader source: Energy.gov [DOE]

    The Organization of PJM States, Inc. (OPSI) is hosting its annual meeting with sessions covering clean power, gas and electric coordination, and more.

  18. Surveillance & Maintenance: The Requirements Based Surveillance and

    Energy Savers [EERE]

    Maintenance Review Process (RBSM) | Department of Energy Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in

  19. LNG Annual Report - 2004 | Department of Energy

    Energy Savers [EERE]

    4 LNG Annual Report - 2004 LNG Annual Report - 2004 PDF icon LNG Annual Report - 2004 More Documents & Publications LNG Annual Report - 2005 LNG Annual Report - 2007 LNG Annual Report - 2006

  20. LNG Annual Report - 2005 | Department of Energy

    Energy Savers [EERE]

    5 LNG Annual Report - 2005 LNG Annual Report - 2005 PDF icon LNG Annual Report - 2005 More Documents & Publications LNG Annual Report - 2004 LNG Annual Report - 2006 LNG Annual Report - 2007

  1. LNG Annual Report - 2011 | Department of Energy

    Energy Savers [EERE]

    1 LNG Annual Report - 2011 LNG Annual Report - 2011 (Revised 3/15/2012) PDF icon LNG Annual Report 2011 More Documents & Publications LNG Annual Report - 2012 LNG Annual Report - 2013 LNG Annual Report - 2010

  2. LNG Annual Report - 2012 | Department of Energy

    Energy Savers [EERE]

    2 LNG Annual Report - 2012 LNG Annual Report - 2012 (Revised 3/21/2013) PDF icon LNG Annual Report - 2012 More Documents & Publications LNG Annual Report - 2013 LNG Annual Report - 2014 LNG Annual Report - 2011

  3. LNG Annual Report - 2014 | Department of Energy

    Energy Savers [EERE]

    Annual Report - 2014 LNG Annual Report - 2014 LNG Annual Report - 2014 rev PDF icon LNG 2014 rev2.pdf More Documents & Publications LNG Annual Report - 2013 LNG Annual Report - 2012 LNG Annual Report - 2015

  4. Recommendations: 2009 Annual Plan | Department of Energy

    Energy Savers [EERE]

    9 Annual Plan Recommendations: 2009 Annual Plan PDF icon URTAC - Recommendations on 2009 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2009 Section 999 Annual Plan Recommendations: 2010 Annual Plan Recommendations: Draft 2010 Section 999 Annual Plan

  5. Maintenance for the Millennium: Another Approach

    SciTech Connect (OSTI)

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  6. Proceedings: 1996 EPRI fossil plant maintenance conference

    SciTech Connect (OSTI)

    1996-07-01

    EPRI sponsors many conferences and workshops addressing various aspects of fossil power plant maintenance. Featured have been topics such as inspection methods, life assessment techniques, overhaul planning, predictive maintenance programs, thermography, vibration monitoring, welding, and component-specific events on boilers, condensers, feedwater heaters, generators, and turbines. The 1996 EPRI Fossil Plant Maintenance Conference-held July 29-August 1, 1996, in Baltimore, Maryland-reached a wider audience by providing a forum to discuss all aspects of fossil plant maintenance. Knowledgeable industry personnel exchanged information on state-of-the-art technology; identified major unresolved problems; and helped establish priorities for further research, development, and demonstration in fossil plant maintenance. This document presents report presented at the conference. Individual papers have been processed separately for the United States Department of Energy databases.

  7. Mechanical Design and Analysis of a 200 MHz, Bolt-together RFQ forthe Accelerator Driven Neutron Source

    SciTech Connect (OSTI)

    Virostek, Steve; Hoff, Matt; Li, Derun; Staples, John; Wells,Russell

    2007-06-20

    A high-yield neutron source to screen sea-land cargocontainers for shielded Special Nuclear Materials (SNM) has been designedat LBNL [1,2]. The Accelerator-Driven Neutron Source (ADNS) uses theD(d,n)3He reaction to create a forward directed neutron beam. Keycomponents are a high-current radio-frequency quadrupole (RFQ)accelerator and a high-power target capable of producing a neutron fluxof>107 n/(cm2 cdot s) at a distance of 2.5 m. The mechanical designand analysis of the four-module, bolt-together RFQ will be presentedhere. Operating at 200 MHz, the 5.1 m long RFQ will accelerate a 40 mAdeuteron beam to 6 MeV. At a 5 percent duty factor, the time-average d+beam current on target is 1.5 mA. Each of the 1.27 m long RFQ moduleswill consist of four solid OFHC copper vanes. A specially designed 3-DO-ring will provide vacuum sealing between both the vanes and themodules. RF connections are made with canted coil spring contacts. Aseries of 60 water-cooled pi-mode rods provides quadrupole modestabilization. A set of 80 evenly spaced fixed slug tuners is used forfinal frequency adjustment and local field perturbationcorrection.

  8. Annual Performance Report FY 2010 Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Annual Performance Plan FY 2011 Annual Performance Report FY 2010 Annual Performance Plan FY 2011 I am pleased to submit the Office of Inspector General's combined Fiscal Year ...

  9. LNG Annual Report - 2008 | Department of Energy

    Energy Savers [EERE]

    8 LNG Annual Report - 2008 LNG Annual Report - 2008 (Revised 10/14/2009) PDF icon LNG Annual Report - 2008 More Documents & Publications LNG Annual Report - 2009

  10. LNG Annual Report - 2009 | Department of Energy

    Energy Savers [EERE]

    9 LNG Annual Report - 2009 LNG Annual Report - 2009 PDF icon LNG Annual Report - 2009 More Documents & Publications LNG Annual Report - 2008

  11. Annual Energy Review, 2008

    SciTech Connect (OSTI)

    2009-06-01

    The Annual Energy Review (AER) is the Energy Information Administration's (EIA) primary report of annual historical energy statistics. For many series, data begin with the year 1949. Included are statistics on total energy production, consumption, trade, and energy prices; overviews of petroleum, natural gas, coal, electricity, nuclear energy, renewable energy, and international energy; financial and environment indicators; and data unit conversions.

  12. Requirements Based Surveillance and Maintenance Review Process Interview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form | Department of Energy Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based Surveillance and Maintenance Review Process Interview Form More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Guidance to Completing the Self-Directed RBSM Interview Form CX-000473: Categorical Exclusion

  13. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance PDF icon ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE

  14. Annual Public Electric Utility data - EIA-412 data file

    U.S. Energy Information Administration (EIA) Indexed Site

    412 Archive Data (The EIA-412 survey has been terminated.) The EIA-412 "Annual Electric Industry Financial Report" collected information such as income statements, balance sheets, sales and purchases, and transmission line data. Form EIA-412 data Schedules Year 2 Electric Balance Sheet 3 Electric Income Statement 4 Electric Plant 5 Taxes, Tax Equivalents, Contributions, and Services During Year 6 Sales of Electricity for Resale (Account 447) 7 Electric Operation and Maintenance

  15. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    7 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Annual, Tables 28, 29, 30 and 31. 2003-15-Form EIA-858, "Uranium Marketing Annual Survey". ...

  16. Annual Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Note: Some of the following documents are in PDF and will require Adobe Reader for viewing. Freedom of Information Act Annual Reports Annual Report for 2015 Annual Report for 2014 ...

  17. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  18. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, November 11, from 08:00 until 18:00 PST. Several systems and services will be unavailable during this time. Edison, Hopper, Data Transfer nodes, and Science Gateway (data portal) nodes will be unavailable 08:00 - 13:00. Carver/Dirac, PDSF, and Genepool will be unavailable 08:00 - 18:00. HPSS and web servers

  19. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 thousand ...

  20. 2015 Uranium Marketing Annual Survey

    U.S. Energy Information Administration (EIA) Indexed Site

    5 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration, Form EIA-858 "Uranium Marketing Annual ...

  1. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 Deliveries 2011 2012 2013 2014 2015 Purchases of ...

  2. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 Delivery year Total purchased (weighted- average price) ...

  3. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 Purchases Weighted- average price Purchases Weighted- ...

  4. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    7 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration, Form EIA-858 "Uranium Marketing Annual ...

  5. 2015 Uranium Marketing Annual Survey

    U.S. Energy Information Administration (EIA) Indexed Site

    U.S. Energy Information Administration, Form EIA-858 ""Uranium Marketing Annual Survey"" (2015)." " U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 15

  6. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    U.S. Energy Information Administration, Form EIA-858 ""Uranium Marketing Annual Survey"" (2015)." " U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 25

  7. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    1 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration, Form EIA-858 "Uranium Marketing Annual ...

  8. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    9 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration: Form EIA-858 "Uranium Marketing Annual ...

  9. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    3 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration, Form EIA-858 "Uranium Marketing Annual ...

  10. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 Origin of ...

  11. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    3 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration: Form EIA-858 "Uranium Marketing Annual ...

  12. 2015 Uranium Market Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 Purchase ...

  13. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    2 U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 thousand ...

  14. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Information Administration, Form EIA-858 ""Uranium Marketing Annual Survey"" (2013-15)." " U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 33

  15. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    8 U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 ...

  16. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    5 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration, Form EIA-858 "Uranium Marketing Annual ...

  17. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 Number of purchasers Quantity with reported price ...

  18. 2015 Uranium Market Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    U.S. Energy Information Administration, Form EIA-858 ""Uranium Marketing Annual Survey"" (2015)." "16 U.S. Energy Information Administration 2015 Uranium Marketing Annual Report

  19. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 Minimum ...

  20. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    7 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration: Form EIA-858 "Uranium Marketing Annual ...

  1. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    1 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration: Form EIA-858 "Uranium Marketing Annual ...

  2. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    9 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... Source: U.S. Energy Information Administration, Form EIA-858 "Uranium Marketing Annual ...

  3. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Information Administration: Form EIA-858 ""Uranium Marketing Annual Survey"" (2013-15)." " U.S. Energy Information Administration 2015 Uranium Marketing Annual Report 1

  4. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Information Administration: Form EIA-858 ""Uranium Marketing Annual Survey"" (2013-15)." "14 U.S. Energy Information Administration 2015 Uranium Marketing Annual Report

  5. ARM - Guidelines : Annual Facility Call

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Facility Call Guidelines Overview Annual Facility Call Small Field Campaigns Review Criteria Expectations for Principal Investigators Forms Propose a Campaign Instrument...

  6. Electricity - Annual Disturbance Events Archive

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Annual Disturbance Events Annual Disturbance Events Archive Last Updated - April 2014 Major Disturbances and Unusual Occurrences 2013 NA excel 2012 NA excel 2011 NA excel 2010 NA ...

  7. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to...

  8. Annual Energy Outlook 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual Energy Outlook 2015 AEO Annual Energy Outlook AEO2015 Annual Energy Outlook 2015 API American Petroleum Institute bbl Barrels bbl/d Barrels per day Brent North Sea Brent Btu British thermal unit(s) CAFE Corporate average fuel economy CAIR Clean Air Interstate Rule CHP Combined heat and power CO2 Carbon dioxide CPI Consumer price index CSAPR Cross-State Air Pollution Rule CTL Coal-to-liquids E85 Motor fuel containing up to 85% ethanol EIA U.S. Energy Information Administration EOR Enhanced

  9. Facility Maintenance Management Functional Area Qualification...

    Office of Environmental Management (EM)

    ... DOE O 433.1B and in accordance with DOE O 226.1B. B. Review submitted NMMP description ... facility maintenance management. 1. DOE O 226.1B, Implementation of Department of Energy ...

  10. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and recycling-type pump, works properly over the long term. Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-typ...

  11. Sound maintenance practices protect fan investments

    SciTech Connect (OSTI)

    Bauer, M.

    2009-11-15

    Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

  12. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's e-Tag and OASIS software vendor will be performing a...

  13. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's e-Tag and OASIS software vendor will be performing a...

  14. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's e-Tag and OASIS software vendor will be performing a...

  15. BPAT Systems Maintenance - March 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 362015 BPAT's e-Tag and OASIS software vendor will be performing a...

  16. Website Maintenance Process and Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Website Maintenance Process and Template Website Maintenance Process and Template Below you can read more about EERE's expectations for website maintenance. In June and December every year, Web coordinators will be asked to attend two special Web Governance Team meetings to report on their website maintenance plans for the rest of the fiscal year. Fill out the Web maintenance template before attending this meeting and email it to the WGT facilitator. File Website maintenance process Microsoft

  17. Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Vehicle Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance

  18. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the ...

  19. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 4 Computerized Maintenance Management System 4.1 Introduction A computerized maintenance management system (CMMS) is a type of management software that performs ...

  20. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Identify tasks that may be performed by operations maintenance personnel. 7. Analyze ... 1999 Maintainability and Maintenance Management By: Joseph D. Patton, Jr. Published ...

  1. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Step 1: Strive to increase management awareness and appreciation of the operations and maintenance programdepartment. * Consider developing a maintenance mission statement and ...

  2. Project Profile: Innovative Application of Maintenance-Free Phase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal ...

  3. FEMP Offers New Training on Photovoltaic Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4, 2014 - 2:40pm ...

  4. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Color Maintenance of LEDs in Laboratory and Field Applications Citation Details In-Document Search Title: Color Maintenance of LEDs in Laboratory and Field Applications Synopsis: ...

  5. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  6. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  7. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area ... EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western ...

  8. How to Determine and Verify Operating and Maintenance Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in Federal ...

  9. FY 2014 Real Property Data Related to Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance PDF icon FY2014DataRelatedtoOperati...

  10. Innovative Application of Maintenance-Free Phase-Change Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Engine Solar Power Generation Innovative Application of Maintenance-Free Phase-Change Thermal Energy ...

  11. GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthines...

    Open Energy Info (EERE)

    b: Inspection and Maintenance and Roadworthiness Jump to: navigation, search Tool Summary LAUNCH TOOL Name: GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthiness...

  12. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He There will be a...

  13. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Locally, Prestige Maintenance also provides grounds maintenance at Ft. Eustis and at Langley Air Force Base. Jefferson Science Associates, LLC, a joint venture of the Southeastern ...

  14. Site Transition Framework for Long-Term Surveillance and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and ...

  15. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term ...

  16. Long-Term Surveillance and Maintenance Program 2003 Report |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report PDF icon Long-Term Surveillance and ...

  17. Operations & Maintenance Best Practices Guide: Chapter 4 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Operations & Maintenance Best Practices Guide: Chapter 4 Guide to chapter 4 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency. Chapter...

  18. 2010 Annual Report

    SciTech Connect (OSTI)

    2010-01-01

    This annual report includes: an overview of Western; approaches for future hydropower and transmission service; major achievements in FY 2010; FY 2010 customer Integrated Resource Planning, or IRP, survey; and financial data.

  19. Petroleum Marketing Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Entire . The entire report as a single file. PDF 1.2MB . Front Matter . Petroleum Marketing Annual Cover Page, Preface, and Table of Contents PDF . Highlights . Petroleum...

  20. Petroleum Marketing Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Entire . The entire report as a single file. PDF 2.9MB . . Front Matter . Petroleum Marketing Annual Cover Page, Contacts, Preface, and Table of Contents PDF . . Highlights ....

  1. Petroleum Marketing Annual 2009

    U.S. Energy Information Administration (EIA) Indexed Site

    cents per gallon to dollars per gallon later this year for the 2010 data. Petroleum Marketing Annual --- Full report in PDF (1.2 MB) Summary Statistics Summary Statistics Tables...

  2. Petroleum Marketing Annual 2008

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Released: August 27, 2009 Petroleum Marketing Annual --- Full report in PDF (1.2 MB) Summary Statistics Summary Statistics Tables PDF 1 Crude Oil Prices PDF TXT 1A Refiner...

  3. Petroleum Marketing Annual 1997

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Entire . The entire report as a single file. PDF 1.2MB . . Front Matter . Petroleum Marketing Annual Cover Page, Contacts, Preface, and Table of Contents PDF . . Highlights ....

  4. Petroleum Marketing Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Entire . The entire report as a single file. PDF 2.9MB . . Front Matter . Petroleum Marketing Annual Cover Page, Contacts, Preface, and Table of Contents PDF . . Highlights ....

  5. Petroleum Marketing Annual 2007

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Released: August 29, 2008 Petroleum Marketing Annual --- Full report in PDF (1.2 MB) Summary Statistics Summary Statistics Tables PDF 1 Crude Oil Prices PDF TXT 1A Refiner...

  6. Petroleum Marketing Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    9 Entire . The entire report as a single file. PDF 1.2MB . Front Matter . Petroleum Marketing Annual Cover Page, Preface, and Table of Contents PDF . Highlights . Petroleum...

  7. Current Annualized Request

    Office of Environmental Management (EM)

    Organization FY 2012 FY 2013 FY 2014 Current Annualized Request CR % National Security Weapons Activities* 7,214,834 7,557,342 7,868,409 +311,067 +4.1% Defense Nuclear...

  8. NCAI Annual Convention

    Broader source: Energy.gov [DOE]

    The National Congress of American Indians (NCAI) is hosting their annual convention featuring networking events, breakout sessions on resiliency and workforce development, and guest speakers. Pre-registration ends September 18.

  9. Annual Energy Outlook 2011

    Gasoline and Diesel Fuel Update (EIA)

    ... Energy Outlook | www.eia.govsteo Annual Energy Outlook | www.eia.govaeo International ... 28,259 27,470 Rocky Mountain Greater Green River Hilliard-Baxter-Mancos 13,302 13,285 ...

  10. 2009 Annual Report

    SciTech Connect (OSTI)

    2009-01-01

    This annual report includes: a brief overview of Western; some of our major achievements in FY 2009; FY 2009 customer Integrated Resource Planning, or IRP, survey; and financial data.

  11. NARUC Annual Meeting

    Broader source: Energy.gov [DOE]

    The National Association of Regulatory Utility Commissioneers (NARUC) is hosting its annual meeting in San Fransisco, CA, from Nov. 16-19, 2014. Registration and housing begins Aug. 27. 

  12. LDRD COMPOSITE ANNUAL REPORT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LDRD Annual Report 2010 From the Laboratory Director I am pleased t o have the opportunity t o introduce the 2010 Laboratory Directed Research a n d Dev elopment ( L DRD) Annual Report . T h i s important program displays both the breadth of SRNL's research efforts and the depth of our commitment to expand the capability and mission impact of this Laboratory. We continue to broaden participation in the LDRD program across the Laboratory while maintaining our record of innovative technical

  13. Natural gas annual 1995

    SciTech Connect (OSTI)

    1996-11-01

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. The 1995 data are presented in a sequence that follows natural gas (including supplemental supplies) from its production to its end use. This is followed by tables summarizing natural gas supply and disposition from 1991 to 1995 for each Census Division and each State. Annual historical data are shown at the national level.

  14. Natural gas annual 1994

    SciTech Connect (OSTI)

    1995-11-17

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. The 1994 data are presented in a sequence that follows natural gas (including supplemental supplies) from its production to its end use. This is followed by tables summarizing natural gas supply and disposition from 1990 to 1994 for each Census Division and each State. Annual historical data are shown at the national level.

  15. NERSC 2013 Annual Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Annual Report National Energy Research Scientific Computing Center 2013 Annual Report Ernest Orlando Lawrence Berkeley National Laboratory 1 Cyclotron Road, Berkeley, CA 94720-8148 This work was supported by the Director, Office of Science, Office of Advanced Scientific Computing Research of the U.S. Department of Energy under Contract No. DE-AC02-05CH11231. Cover Image Credits: front cover, left to right: Linda Sugiyama, Massachusetts Institute of Technology; IceCube Collaboration; David

  16. Annual Energy Outlook 2015

    Gasoline and Diesel Fuel Update (EIA)

    14, 2014 Annual Energy Outlook 2014 foresees growth of LNG as a fuel for railroads The U.S. Energy Information Administration expects liquefied natural gas, or LNG, to play an increasing role in powering freight locomotives in the coming years. EIA's Reference case, in its recently released Annual Energy Outlook 2014 indicates that growing natural gas production and lower natural gas spot prices compared to crude oil prices could provide significant cost savings for locomotives that use LNG as a

  17. Impact of Different Standard Type A7A Drum Closure-Ring Practices on Gasket Contraction and Bolt Closure Distance– 15621

    SciTech Connect (OSTI)

    Ketusky, Edward; Blanton, Paul; Bobbitt, John H.

    2015-03-11

    The Department of Energy, the Savannah River National Laboratory, several manufacturers of specification drums, and the United States Department of Transportation (DOT) are collaborating in the development of a guidance document for DOE contractors and vendors who wish to qualify containers to DOT 7A Type A requirements. Currently, the effort is focused on DOT 7A Type A 208-liter (55-gallons) drums with a standard 12-gauge bolted closure ring. The U.S. requirements, contained in Title 49, Part 178.350 “Specification 7A; general packaging, Type A specifies a competent authority review of the packaging is not required for the transport of (Class 7) radioactive material containing less than Type A quantities of radioactive material. For Type AF drums, a 4 ft. regulatory free drop must be performed, such that the drum “suffers maximum damage.” Although the actual orientation is not defined by the specification, recent studies suggest that maximum damage would result from a shallow angle top impact, where kinetic energy is transferred to the lid, ultimately causing heavy damage to the lid, or even worse, causing the lid to come off. Since each vendor develops closure recommendations/procedures for the drums they manufacture, key parameters applied to drums during closing vary based on vendor. As part of the initial phase of the collaboration, the impact of the closure variants on the ability of the drum to suffer maximum damage is investigated. Specifically, closure testing is performed varying: 1) the amount of torque applied to the closure ring bolt; and, 2) stress relief protocol, including: a) weight of hammer; and, b) orientation that the hammer hits the closure ring. After closure, the amount of drum lid gasket contraction and the distance that the closure bolt moves through the closure ring is measured.

  18. NREL Annual Environmental Performance Reports (Annual Site Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reports) | Department of Energy Annual Environmental Performance Reports (Annual Site Environmental Reports) NREL Annual Environmental Performance Reports (Annual Site Environmental Reports) Every year NREL prepares an Environmental Performance Report meeting the requirements of an Annual Site Environmental Report (ASER) per DOE Order 231.1B. The report is written to inform the public, regulators, and other stakeholders of NREL's environmental performance. The report provides updates on

  19. LNG Annual Report - 2007 | Department of Energy

    Energy Savers [EERE]

    7 LNG Annual Report - 2007 LNG Annual Report - 2007 (Revised 10/10/2008) PDF icon LNG Annual Report - 2007 More Documents & Publications LNG Annual Report - 2008 LNG Annual Report - 2006

  20. LNG Annual Report - 2013 | Department of Energy

    Energy Savers [EERE]

    3 LNG Annual Report - 2013 LNG Annual Report - 2013 PDF icon LNG 2013.pdf More Documents & Publications LNG Annual Report - 2012 LNG Annual Report - 2014 LNG Annual Report - 2015

  1. LNG Annual Report - 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report - 2015 LNG Annual Report - 2015 LNG Annual Report - 2015 PDF icon LNG 2015.pdf More Documents & Publications LNG Annual Report - 2014 LNG Annual Report - 2013 LNG Monthly 2016

  2. Annual Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Reports Annual Reports Annual Reports December 30, 2014 Southeastern Power Administration 2014 Annual Report This report reflects our agency's programs,accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2013, and ending September 30, 2014. December 31, 2013 Southeastern Power Administration 2013 Annual Report This report reflects our agency's programs,accomplishments, operational, and financial activities for the 12-month period beginning

  3. Inertial Fusion Power Plant Concept of Operations and Maintenance

    SciTech Connect (OSTI)

    Anklam, T.; Knutson, B.; Dunne, A. M.; Kasper, J.; Sheehan, T.; Lang, D.; Roberts, V.; Mau, D.

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  4. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2012 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  5. Long-Term Surveillance and Maintenance Program

    Office of Legacy Management (LM)

    ... mild. The wind at the Shiprock site blows most frequently from the southeast in summer and from the west in winter. On an annual basis, the most frequent wind direction is ...

  6. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  7. Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder

  8. Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Facility Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on

  9. Director of Maintenance for USA Jet Airlines, Inc. | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Director of Maintenance for USA Jet Airlines, Inc. Rick A. Wilson Rick Wilson July 2009 U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year Rick A. Wilson has received the U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year award. Wilson is the director of maintenance for USA Jet Airlines, Inc., in Albuquerque. He manages the maintenance activity of seven different fleet aircraft for the Office

  10. Accelerated learning approaches for maintenance training

    SciTech Connect (OSTI)

    Erickson, E.J.

    1991-01-01

    As a training tool, Accelerated Learning techniques have been in use since 1956. Trainers from a variety of applications and disciplines have found success in using Accelerated Learning approaches, such as training aids, positive affirmations, memory aids, room arrangement, color patterns, and music. Some have thought that maintenance training and Accelerated Learning have nothing in common. Recent training applications by industry and education of Accelerated Learning are proving very successful by several standards. This paper cites available resource examples and challenges maintenance trainers to adopt new ideas and concepts to accelerate learning in all training setting. 7 refs.

  11. International energy annual 1996

    SciTech Connect (OSTI)

    1998-02-01

    The International Energy Annual presents an overview of key international energy trends for production, consumption, imports, and exports of primary energy commodities in over 220 countries, dependencies, and areas of special sovereignty. Also included are population and gross domestic product data, as well as prices for crude oil and petroleum products in selected countries. Renewable energy reported in the International Energy Annual includes hydroelectric power, geothermal, solar, and wind electric power, biofuels energy for the US, and biofuels electric power for Brazil. New in the 1996 edition are estimates of carbon dioxide emissions from the consumption of petroleum and coal, and the consumption and flaring of natural gas. 72 tabs.

  12. Natural gas annual 1997

    SciTech Connect (OSTI)

    1998-10-01

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. The 1997 data are presented in a sequence that follows natural gas (including supplemental supplies) from its production to its end use. This is followed by tables summarizing natural gas supply and disposition from 1993 to 1997 for each Census Division and each State. Annual historical data are shown at the national level. 27 figs., 109 tabs.

  13. Annual Technology Baseline

    Broader source: Energy.gov [DOE]

    The National Renewable Energy Laboratory is conducting a study sponsored by the U.S. Department of Energy DOE, Office of Energy Efficiency and Renewable Energy (EERE), that aims to document and implement an annual process designed to identify a realistic and timely set of input assumptions (e.g., technology cost and performance, fuel costs), and a diverse set of potential futures (standard scenarios), initially for electric sector analysis. This primary product of the Annual Technology Baseline (ATB) project component includes detailed cost and performance data (both current and projected) for both renewable and conventional technologies. This data is presented in MS Excel.

  14. Annual Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Site Environmental Report - 2002 Annual Site Environmental Report - 2002 DOE/NV11718--842 Prepared by Bechtel Nevada Post Office Box 98521 Las Vegas, NV 89193-8521 Prepared by Bechtel Nevada Post Office Box 98521 Las Vegas, NV 89193-8521 Prepared for the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Contract Number DE-AC08-96NV11718 Prepared for the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Contract Number

  15. DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 PDF icon DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 More Documents & Publications Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Office Inspector General DOE Annual

  16. EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Mitchell, E.

    2011-01-18

    The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

  17. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  18. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  19. Southeastern Power Administration 2011 Annual Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Annual Report Southeastern Power Administration 2011 Annual Report This report reflects ... More Documents & Publications Southeastern Power Administration 2010 Annual Report ...

  20. Southeastern Power Administration 2009 Annual Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Annual Report Southeastern Power Administration 2009 Annual Report This past year, ... More Documents & Publications Southeastern Power Administration 2008 Annual Report ...

  1. Southeastern Power Administration 2013 Annual Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Report Southeastern Power Administration 2013 Annual Report This report reflects ... More Documents & Publications Southeastern Power Administration 2010 Annual Report ...

  2. Southeastern Power Administration 2010 Annual Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Annual Report Southeastern Power Administration 2010 Annual Report This past year, ... More Documents & Publications Southeastern Power Administration 2008 Annual Report ...

  3. Southeastern Power Administration 2012 Annual Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Annual Report Southeastern Power Administration 2012 Annual Report This report reflects ... More Documents & Publications Southeastern Power Administration 2010 Annual Report ...

  4. Southeastern Power Administration 2008 Annual Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Annual Report Southeastern Power Administration 2008 Annual Report This past year, ... More Documents & Publications Southeastern Power Administration 2010 Annual Report ...

  5. Southeastern Power Administration 2007 Annual Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Annual Report Southeastern Power Administration 2007 Annual Report This past year, ... More Documents & Publications Southeastern Power Administration 2010 Annual Report ...

  6. Stanford Geothermal Workshop 2012 Annual Meeting | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2012 Annual Meeting Stanford Geothermal Workshop 2012 Annual Meeting Presentation slides for the Stanford Geothermal Workshop Annual Meeting presentation by Doug Hollett, ...

  7. FY2010 EERE Web Site Annual Report

    Broader source: Energy.gov (indexed) [DOE]

    0 WEB SITE ANNUAL REPORT TECHNOLOGY ADVANCEMENT AND OUTREACH | 01 EERE FISCAL YEAR 2010 WEB SITE ANNUAL REPORT FISCAL YEAR 2010 WEB SITE ANNUAL REPORT TECHNOLOGY ADVANCEMENT AND ...

  8. Annual DOE Occupational Radiation Exposure Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual DOE Occupational Radiation Exposure Reports Annual DOE Occupational Radiation Exposure Reports November 17, 2015 Annual DOE Occupational Radiation Exposure | 2014 Report The...

  9. Office Inspector General DOE Annual Performance Report FY 2008, Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plan FY 2009 | Department of Energy Inspector General DOE Annual Performance Report FY 2008, Annual Performance Plan FY 2009 Office Inspector General DOE Annual Performance Report FY 2008, Annual Performance Plan FY 2009 During Fiscal Year (FY) 2008, we reviewed a variety of critical areas relevant to the Department's mission priorities. One of our goals, for example, was to examine possible programmatic improvements in Department operations relating to cyber security and

  10. EIS-0380: Annual Mitigation Action Plan Annual Report

    Broader source: Energy.gov [DOE]

    Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2013 Mitigation Action Plan Annual Report

  11. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  12. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  13. International Energy Annual, 1992

    SciTech Connect (OSTI)

    Not Available

    1994-01-14

    This report is prepared annually and presents the latest information and trends on world energy production and consumption for petroleum, natural gas, coal, and electricity. Trade and reserves are shown for petroleum, natural gas, and coal. Prices are included for selected petroleum products. Production and consumption data are reported in standard units as well as British thermal units (Btu) and joules.

  14. Annual Performance Report

    Office of Legacy Management (LM)

    3 Through March 2014 for the Shiprock, New Mexico, Site October 2014 LMS/SHP/S12021 This page intentionally left blank U.S. Department of Energy Annual Performance Report, Shiprock, New Mexico October 2014 Doc. No. S12021 Page i Contents Abbreviations ................................................................................................................................. iii Executive Summary

  15. Annual Performance Report

    Office of Legacy Management (LM)

    4 Through March 2015 for the Shiprock, New Mexico, Site August 2015 LMS/SHP/S13080 This page intentionally left blank U.S. Department of Energy Annual Performance Report, Shiprock, New Mexico August 2015 Doc. No. S13080 Page i Contents Abbreviations ................................................................................................................................. iii Executive Summary

  16. Annual Coal Distribution

    Reports and Publications (EIA)

    2015-01-01

    The Annual Coal Distribution Report (ACDR) provides detailed information on domestic coal distribution by origin state, destination state, consumer category, and method of transportation. Also provided is a summary of foreign coal distribution by coal-producing state. All data for the report year are final and this report supersedes all data in the quarterly distribution reports.

  17. NERSC Annual Report 2002

    SciTech Connect (OSTI)

    Hules, John

    2003-01-31

    The National Energy Research Scientific Computing Center (NERSC) is the primary computational resource for scientific research funded by the DOE Office of Science. The Annual Report for FY2002 includes a summary of recent computational science conducted on NERSC systems (with abstracts of significant and representative projects), and information about NERSC's current and planned systems and service

  18. 2013 NUFO Annual Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 NUFO Annual Meeting http://www.nufo.org/events.aspx?id=64 June 19 - 21, 2013; Lawrence Berkeley National Laboratory, hosted jointly by the six user facilities at LBNL: the Advanced Light Source, The Molecular Foundry, the Joint Genome Institute, the National Center for Electron Microscopy, ESNet and NERSC.

  19. Uranium industry annual 1998

    SciTech Connect (OSTI)

    1999-04-22

    The Uranium Industry Annual 1998 (UIA 1998) provides current statistical data on the US uranium industry`s activities relating to uranium raw materials and uranium marketing. It contains data for the period 1989 through 2008 as collected on the Form EIA-858, ``Uranium Industry Annual Survey.`` Data provides a comprehensive statistical characterization of the industry`s activities for the survey year and also include some information about industry`s plans and commitments for the near-term future. Data on uranium raw materials activities for 1989 through 1998, including exploration activities and expenditures, EIA-estimated reserves, mine production of uranium, production of uranium concentrate, and industry employment, are presented in Chapter 1. Data on uranium marketing activities for 1994 through 2008, including purchases of uranium and enrichment services, enrichment feed deliveries, uranium fuel assemblies, filled and unfilled market requirements, and uranium inventories, are shown in Chapter 2. The methodology used in the 1998 survey, including data edit and analysis, is described in Appendix A. The methodologies for estimation of resources and reserves are described in Appendix B. A list of respondents to the ``Uranium Industry Annual Survey`` is provided in Appendix C. The Form EIA-858 ``Uranium Industry Annual Survey`` is shown in Appendix D. For the readers convenience, metric versions of selected tables from Chapters 1 and 2 are presented in Appendix E along with the standard conversion factors used. A glossary of technical terms is at the end of the report. 24 figs., 56 tabs.

  20. 2014 Annual AFN Convention

    Broader source: Energy.gov [DOE]

    The AFN Convention is the largest representative annual gathering in the United States of any Native peoples. In addition to the memorable keynote speeches, the expert panels and special reports, the Convention features several evenings of cultural performances known as Quyana Alaska.

  1. NERSC Annual Report 2005

    SciTech Connect (OSTI)

    Hules , John

    2006-07-31

    The National Energy Research Scientific Computing Center (NERSC) is the premier computational resource for scientific research funded by the DOE Office of Science. The Annual Report includes summaries of recent significant and representative computational science projects conducted on NERSC systems as well as information about NERSC's current and planned systems and services.

  2. Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan

    Broader source: Energy.gov [DOE]

    Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan

  3. Tamper indicating bolt

    DOE Patents [OSTI]

    Blagin, Sergei V.; Barkanov, Boris P.

    2004-09-14

    A tamper-indicating fastener has a cylindrical body with threads extending from one end along a portion of the body, and a tamper indicating having a transducer for converting physical properties of the body into electronic data; electronics for recording the electronic data; and means for communicating the recorded information to a remote location from said fastener. The electronics includes a capacitor that varies as a function of force applied by the fastener, and non-volatile memory for recording instances when the capacitance varies, providing an indication of unauthorized access.

  4. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 2014 2015 2014 2015 2014 2015 Weighted-average price ...

  5. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    2015 Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 thousand pounds U 3 O 8 equivalent Year Maximum ...

  6. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 Table S3a. Foreign purchases, foreign sales, and uranium ...

  7. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... and 16. 2003-15-Form EIA-858, "Uranium Marketing Annual Survey". million pounds U 3 O 8 ...

  8. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    5 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May ... and 27. 2003-15-Form EIA-858, "Uranium Marketing Annual Survey". - No data reported. 0 ...

  9. 2010 Quality Council Annual Report

    Broader source: Energy.gov [DOE]

    DEPARTMENT OF ENERGY QUALITY COUNCIL ANNUAL REPORT For Calendar Year 2010 Office of Health Safety and Security

  10. 2011 Quality Council Annual Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    DEPARTMENT OF ENERGY QUALITY COUNCIL ANNUAL REPORT For Calendar Year 2011 Office of Health Safety and Security

  11. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 1999 Annual Report.

    SciTech Connect (OSTI)

    Bluff, Stanley

    2000-12-01

    In October of 1997, The construction of the Kalispel Tribal Hatchery was complete. No spawning activity was recorded for the spring of 1998. On June 14, 1999 the first spawn at the Kalispel Tribal Hatchery was successful. A total of seven nests were fertilized that produced approximately 144,000 fry. The second spawn occurred on July 13, 1999 and a total of six nests were fertilized producing approximately 98,0000 fry. The total amount of largemouth bass fry produced at the Kalispel Tribal Hatchery was 242,000.

  12. Kalispel Resident Fish Project : Tribal Hatchery Operations and Maintenance Annual Report, 2002.

    SciTech Connect (OSTI)

    Nenema, David

    2003-03-01

    The Kalispel Tribal hatchery successfully spawned largemouth bass broodfish in spring 2002. Approximately 150,000 eggs were produced and hatched. These fry were started on brine shrimp for a period of ten days. At this time, the fry needed more abundance food supply. Cannibalism started and the hatchery staff transferred the remaining fry to the river in hopes that some fish would survive.

  13. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    SciTech Connect (OSTI)

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

  14. Annual Performance Report FY 2004 Annual Performance Plan FY 2005,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE/IG-APP-007 | Department of Energy 4 Annual Performance Plan FY 2005, DOE/IG-APP-007 Annual Performance Report FY 2004 Annual Performance Plan FY 2005, DOE/IG-APP-007 I am pleased to present the Office of Inspector General's (OIG's) combined Fiscal Year 2004 Annual Performance Report and Fiscal Year 2005 Annual Performance Plan. In Fiscal Year 2004, the Department was ranked first among all cabinet agencies in implementing the President's Management Agenda. We are proud to have played a

  15. Recommendations: 2007 Annual Plan | Department of Energy

    Energy Savers [EERE]

    7 Annual Plan Recommendations: 2007 Annual Plan PDF icon URTAC Recommendations: Section 999 2007 Annual Plan More Documents & Publications Recommendations: 2008 Annual Plan URTAC Meeting - March 4, 2008 URTAC Meeting - July 2007

  16. Recommendations: 2008 Annual Plan | Department of Energy

    Energy Savers [EERE]

    8 Annual Plan Recommendations: 2008 Annual Plan PDF icon URTAC Recommendations: 2008 Annual Plan More Documents & Publications Recommendations: 2007 Annual Plan URTAC Meeting - December 18, 2013 URTAC Meeting - March 4, 2008

  17. Methane Hydrate Annual Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Reports Methane Hydrate Annual Reports Section 968 of the Energy Policy Act of 2005 requires the Department of Energy to submit to Congress an annual report on the results of Methane Hydrate research. Listed are the Annual Reports per Fiscal Year. PDF icon FY 13 Methane Hydrates Annual Report to Congress PDF icon FY 12 Methane Hydrates Annual Report to Congress PDF icon FY 11 Methane Hydrates Annual Report to Congress PDF icon FY 10 Methane Hydrates Annual Report to Congress More

  18. International energy annual 1997

    SciTech Connect (OSTI)

    1999-04-01

    The International Energy Annual presents an overview of key international energy trends for production, consumption, imports, and exports of primary energy commodities in over 220 countries, dependencies, and areas of special sovereignty. Also included are population and gross domestic product data, as well as prices for crude oil and petroleum products in selected countries. Renewable energy reported in the International Energy Annual includes hydroelectric power and geothermal, solar, and wind electric power. Also included are biomass electric power for Brazil and the US, and biomass, geothermal, and solar energy produced in the US and not used for electricity generation. This report is published to keep the public and other interested parties fully informed of primary energy supplies on a global basis. The data presented have been largely derived from published sources. The data have been converted to units of measurement and thermal values (Appendices E and F) familiar to the American public. 93 tabs.

  19. Annual Energy Review 2007

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    2008-06-01

    The Annual Energy Review (AER) is the Energy Information Administration's (EIA) primary report of annual historical energy statistics. For many series, data begin with the year 1949. Included are data on total energy production, consumption, and trade; overviews of petroleum, natural gas, coal, electricity, nuclear energy, renewable energy, international energy, as well as financial and environment indicators; and data unit conversion tables. Publication of this report is required under Public Law 95–91 (Department of Energy Organization Act), Section 205(c), and is in keeping with responsibilities given to the EIA under Section 205(a)(2), which states: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....”

  20. Renewable energy annual 1995

    SciTech Connect (OSTI)

    1995-12-01

    The Renewable Energy Annual 1995 is the first in an expected series of annual reports the Energy Information Administration (EIA) intends to publish to provide a comprehensive assessment of renewable energy. This report presents the following information on the history, status, and prospects of renewable energy data: estimates of renewable resources; characterizations of renewable energy technologies; descriptions of industry infrastructures for individual technologies; evaluations of current market status; and assessments of near-term prospects for market growth. An international section is included, as well as two feature articles that discuss issues of importance for renewable energy as a whole. The report also contains a number of technical appendices and a glossary. The renewable energy sources included are biomass (wood), municipal solid waste, biomass-derived liquid fuels, geothermal, wind, and solar and photovoltaic.

  1. Petroleum marketing annual 1994

    SciTech Connect (OSTI)

    1995-08-24

    The Petroleum Marketing Annual (PMA) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysis, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the fob and landed cost of imported crude oil, and the refiners` acquisition cost of crude oil. Refined petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data in the Petroleum Marketing Annual. For this production, all estimates have been recalculated since their earlier publication in the Petroleum Marketing Monthly (PMM). These calculations made use of additional data and corrections that were received after the PMM publication date.

  2. Coal industry annual 1997

    SciTech Connect (OSTI)

    1998-12-01

    Coal Industry Annual 1997 provides comprehensive information about US coal production, number of mines, prices, productivity, employment, productive capacity, and recoverable reserves. US Coal production for 1997 and previous years is based on the annual survey EIA-7A, Coal Production Report. This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report includes a national total coal consumption for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. 14 figs., 145 tabs.

  3. Enhanced human performance of utility maintenance programs

    SciTech Connect (OSTI)

    Fresco, A.; Haber, S.; O`Brien, J.

    1993-08-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant`s maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program.

  4. 2009 Annual Plan | Department of Energy

    Energy Savers [EERE]

    Annual Plan 2009 Annual Plan PDF icon Section 999: 2009 Annual Plan More Documents & Publications 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan

  5. 2011 Annual Plan | Department of Energy

    Energy Savers [EERE]

    Annual Plan 2011 Annual Plan Section 999: 2011 Annual Plan PDF icon Section 999: 2011 Annual Plan More Documents & Publications Recommendations: Draft 2008 Section 999 Annual Plan UDAC Meeting - June 2007 2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program

  6. 2008 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Annual Plan 2008 Annual Plan PDF icon Section 999: 2008 Annual Plan More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2007 Annual Plan Recommendations: Draft 2008 Section 999 Annual Plan

  7. 2013 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Plan 2013 Annual Plan Ultra-Deepwater and Uncoventional Natural Gas and Other Petroleum Resources Research and Development Program Report to Congress, June 2013 PDF icon Section 999: 2013 Annual Plan More Documents & Publications 2011 Annual Plan Draft 2014 Annual Plan Sec. 999 Annual Plan 2012

  8. Standard Scenarios Annual Report

    Broader source: Energy.gov [DOE]

    The National Renewable Energy Laboratory is conducting a study sponsored by the U.S. Department of Energy DOE, Office of Energy Efficiency and Renewable Energy (EERE), that aims to document and implement an annual process designed to identify a realistic and timely set of input assumptions (e.g., technology cost and performance, fuel costs), and a diverse set of potential futures (standard scenarios), initially for electric sector analysis.

  9. 2009 ISCMEM Annual Meeting

    Energy Savers [EERE]

    ascemdoe.org Advanced Simulation Capability for Environmental Management Overview Presenters: Justin Marble (DOE-HQ Program Manager) Paul Dixon (Multi-Laboratory Project Manager, LANL) and Vicky Freedman (PNNL) Technical Team: Tim Scheibe (PNNL), David Moulton (LANL), Mark Freshley (PNNL); Stefan Finsterle (LBNL); Carl Steefel (LBNL); Haruko Wainwright (LBNL); Roger Seitz (SRNL) Kurt Gerdes (Director, DOE Office of Soil and Groundwater) Patricia Lee (DOE-EM) Presented at the EMAB Annual Meeting

  10. NSLS annual report 1984

    SciTech Connect (OSTI)

    Klaffky, R.; Thomlinson, W.

    1984-01-01

    The first comprehensive Annual Report of the National Synchrotron Light Source comes at a time of great activity and forward motion for the facility. In the following pages we outline the management changes that have taken place in the past year, the progress that has been made in the commissioning of the x-ray ring and in the enhanced utilization of the uv ring, together with an extensive discussion of the interesting scientific experiments that have been carried out.

  11. NERSC 2001 Annual Report

    SciTech Connect (OSTI)

    Hules, John

    2001-12-12

    The National Energy Research Scientific Computing Center (NERSC) is the primary computational resource for scientific research funded by the DOE Office of Science. The Annual Report for FY2001 includes a summary of recent computational science conducted on NERSC systems (with abstracts of significant and representative projects); information about NERSC's current systems and services; descriptions of Berkeley Lab's current research and development projects in applied mathematics, computer science, and computational science; and a brief summary of NERSC's Strategic Plan for 2002-2005.

  12. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Notices  The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent receives benefits for a mastectomy and elects breast reconstruction in connection with the mastectomy. Benefits will not be restricted provided that the breast reconstruction is performed in a manner determined in consultation with you or your dependent's physician and may include:  all stages of reconstruction of the breast on

  13. Annual Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ‹ Analysis & Projections Annual Energy Outlook 2015 Release Date: April 14, 2015 | Next Release Date: June 2016 | correction | full report Overview Data Reference Case Side Cases Interactive Table Viewer By Section Executive summary Economic growth Prices Delivered energy consumption by sector Energy consumption by primary fuel Energy intensity Energy production, imports, and exports Electricity generation Energy-related carbon dioxide emissions Appendices Correction/Update 4/21/2015 The

  14. Annual Coal Report 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual Coal Report 2014 March 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing

  15. Annual Power Electric

    U.S. Energy Information Administration (EIA) Indexed Site

    Electric Power Annual Update / Revision Data for 2014 updated: February 16, 2016 February 16, 2016 Table update: The following tables are being withheld pending the availability of additional data: Table 8.5. Revenue and Expense Statistics for U.S. Cooperative Borrower-Owned Electric Utilities Table 8.6.A. Noncoincident Peak Load by North American Electric Reliability Corporation Assessment Area, Actual Table 8.6.B. Noncoincident Peak Load by North American Electric Reliability Corporation

  16. 2008 annual merit review

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    The 2008 DOE Vehicle Technologies Program Annual Merit Review was held February 25-28, 2008 in Bethesda, Maryland. The review encompassed all of the work done by the Vehicle Technologies Program: a total of 280 individual activities were reviewed, by a total of just over 100 reviewers. A total of 1,908 individual review responses were received for the technical reviews, and an additional 29 individual review responses were received for the plenary session review.

  17. CB-EMIS MAINTENANCE MONITORING SYSTEM

    Energy Science and Technology Software Center (OSTI)

    2006-10-01

    This system continuously monitors all components of a CB-EMIS (ANL-02-078)installation such as signals for video cameras, detector, train data, meteorological data, computer and network equipment and reports exceptions to maintenance staff so that corrections can be made as soon as possible. This monitoring system is built within Nagios (www.nagios.org), a free open source host service and network monitoring program.

  18. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  19. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  20. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  1. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste

  2. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance ... to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). ...

  3. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year ... PDF icon Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End ...

  4. Estimated Maintenance Cost Savings from a Geothermal Heat Pump Energy Savings Performance Contract at Fort Polk, LA

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  5. Estimated maintenance cost savings from a geothermal heat pump energy savings performance contract at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.

    1997-12-31

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all the equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  6. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    SciTech Connect (OSTI)

    2013-03-01

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

  7. Operations and Maintenance in Federal Facilities | Department of Energy

    Energy Savers [EERE]

    Operations and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-type pump, works properly over the long term. Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-type pump, works properly over the long term. Federal facilities rely on pumps, motors, fans, and other mechanical systems

  8. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2013 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  9. Annual Performance Report FY 2011 Annual Performance Plan FY 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Inspector General Annual Performance Report FY 2011 Annual Performance Plan FY 2012 2 FY 2011 OIG Performance Results The OIG measures its performance against long-term and annual goals set forth in OIG planning documents. During this reporting period, the OIG successfully achieved its FY 2011 performance goals. The following are the specific results: Goal 1 Promote Presidential Reform Initiatives, Secretarial Mission Priorities, and Congress Objective 1: Conduct

  10. Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 | Department of Energy 2, Annual Performance Plan FY 2013 & FY 2014 Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY 2014 PDF icon Annual Performance Report and Plan FY12 FY13 FY14 More Documents & Publications Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2011 Annual

  11. Microsoft Word - S08846_2012_Annual_IC report

    Office of Legacy Management (LM)

    MDC Property This page intentionally left blank U.S. Department of Energy Annual Assessment of the Effectiveness of Site-Wide Institutional Controls June 2012 Doc. No. S08846 Page B-1 Annual Assessment of the Effectiveness of Site-Wide Institutional Controls U.S. Department of Energy Doc. No. S08846 June 2012 Page B-2 U.S. Department of Energy Annual Assessment of the Effectiveness of Site-Wide Institutional Controls June 2012 Doc. No. S08846 Page B-3 Annual Assessment of the Effectiveness of

  12. Annual Performance Report FY 2011 Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exceeded Goal 2d. By June, 2011, complete an annual risk-based programmatic assessment that considers OIG institutional knowledge; past program performance; funding levels; ...

  13. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  14. Current Annualized Request

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appropriation FY 2012 FY 2013 FY 2014 Current Annualized Request CR $ % Energy And Water Development, And Related Agencies Energy Programs Energy Efficiency and Renewable Energy 1,780,548 1,820,713 2,775,700 +995,152 +55.9% Electricity Delivery and Energy Reliability 136,178 139,954 169,015 +32,837 +24.1% Nuclear Energy 760,466 770,075 735,460 -25,006 -3.3% Race to the Top for Energy Efficiency and Grid Modernization 0 0 200,000 +200,000 N/A Fossil Energy Programs Fossil Energy Research and

  15. International energy annual 1995

    SciTech Connect (OSTI)

    1996-12-01

    The International Energy Annual presents information and trends on world energy production and consumption for petroleum, natural gas, coal, and electricity. Production and consumption data are reported in standard units as well as British thermal units (Btu). Trade and reserves are shown for petroleum, natural gas, and coal. Data are provided on crude oil refining capacity and electricity installed capacity by type. Prices are included for selected crude oils and for refined petroleum products in selected countries. Population and Gross Domestic Product data are also provided.

  16. Annual Energy Review 2010

    SciTech Connect (OSTI)

    2011-10-01

    This twenty-ninth edition of the Annual Energy Review (AER) presents the U.S. Energy Information Administration’s (EIA) most comprehensive look at integrated energy statistics. The summary statistics on the Nation’s energy production, consumption, trade, stocks, and prices cover all major energy commodities and all energy-consuming sectors of the U.S. economy from 1949 through 2010. The AER is EIA’s historical record of energy statistics and, because the coverage spans six decades, the statistics in this report are well-suited to long-term trend analysis.

  17. Annual Energy Review 2001

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    2002-11-01

    The Annual Energy Review (AER) is a statistical history of energy activities in the United States. It documents trends and milestones in U.S. energy production, trade, storage, pricing, and consumption. Each new year of data that is added to the time series—which now reach into 7 decades—extends the story of how Americans have acquired and used energy. It is a story of continual change as the Nation's economy grew, energy requirements expanded, resource availability shifted, and interdependencies developed among nations.

  18. Renewable energy annual 1996

    SciTech Connect (OSTI)

    1997-03-01

    This report presents summary data on renewable energy consumption, the status of each of the primary renewable technologies, a profile of each of the associated industries, an analysis of topical issues related to renewable energy, and information on renewable energy projects worldwide. It is the second in a series of annual reports on renewable energy. The renewable energy resources included in the report are biomass (wood and ethanol); municipal solid waste, including waste-to-energy and landfill gas; geothermal; wind; and solar energy, including solar thermal and photovoltaic. The report also includes various appendices and a glossary.

  19. Annual Reports - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Reports Annual Reports 2011 Annual Report -Technical Summary (Apr, 2011) Book of Abstracts, Second Annual Conference of the CEFRC, Princeton, NJ (Aug, 2011) State of the CEFRC, (July 2011) 2010 Annual Report - Technical Summary (Apr, 2010) State of the CEFRC, An Annual Report to the Combuston and Fuels Community, Princeton, NJ (Sept, 2010). Book of Abstracts, First Annual Conference of the CEFRC, Princeton, NJ (Sept, 2010) © 2016 The Trustees of Princeton University Last update: October

  20. Portsmouth Annual Site Environmental Reports

    Broader source: Energy.gov [DOE]

    The Portsmouth Annual Site Environmental Reports are prepared to summarize environmental activities, primarily environmental monitoring, at the Portsmouth Site. The report fulfills a requirement of DOE Order 231.1B, Environment, Safety and Health Reporting, for preparation of an annual summary of environmental data to characterize environmental management performance. The Annual Site Environmental Report also provides the means by which DOE demonstrates compliance with the radiation protection requirements of DOE Order 458.1, Radiation Protection of the Public and the Environment.

  1. HAB Annual Report - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Annual Report Hanford Advisory Board Convening Report SSAB Guidance Memorandum of Understanding Membership Nomination and Appointment Process Operating Ground Rules Calendars Advice and Responses Full Board Meeting Information Committee Meeting Information Outgoing Board Correspondence Key Board Products and Special Reports HAB Annual Report HAB and Committee Lists Points of Contact Related Links HAB Annual Report Email Email Page | Print Print Page |Text Increase Font Size Decrease Font

  2. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  3. Converting urban tree maintenance residue to energy

    SciTech Connect (OSTI)

    Murphey, W.K.; Massey, J.G.; Sumrall, A.

    1980-01-01

    Three methods of utilizing urban wood waste collected by a tree maintenance firm in Houston, Texas (handling 30,000 ton waste/year) are examined: (a) hauling to a remote landfill; (b) chipping and hauling to a (local) power plant and converting to electricity; and (c) chipping and selling to an outside firm for use as boiler fuel. Breakdown of costs are given for each method in monetary and energy terms. Method (b) was the cheapest, producing a net energy gain (870 million Btu/day), but the firm chose method (c), since it realized a direct monetary return.

  4. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  5. Tanana Chiefs Conference Annual Convention

    Broader source: Energy.gov [DOE]

    The Tanana Chiefs Conference is holding its annual convention to discuss issues in the region, hold elections, and adopt resolutions presented by Tribes.

  6. 2006 Annual Report: Discovering Solutions

    SciTech Connect (OSTI)

    2006-01-01

    This annual report includes: a brief overview of Western; FY 2006 highlights; FY 2006 Integrated Resource Planning, or IRP, summary; and financial data.

  7. Annual Emergency Preparedness Grant Distributed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Emergency Preparedness Grant Distributed The Emergency Preparedness Working Group (EPWG) recently came together to distribute approximately 415,000 in grant funding for ...

  8. Annual Training Summary Report Template

    Broader source: Energy.gov [DOE]

    The Annual Training Summary Report is a template used by the organization's training POC to report on the training their organization's employees completed in the current Fiscal Year.

  9. NARUC 127th Annual Meeting

    Broader source: Energy.gov [DOE]

    The National Association of Regulatory Utility Commissioners (NARUC) is hosting its annual meeting to set policy, share best practices, and discuss crucial industry issues.

  10. OHA 2014 ANNUAL REPORT DRAFT....

    Energy Savers [EERE]

    DOE/HG-0026 Office of Hearings & Appeals Annual Report FY 2014 Message from the Director . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 I. Areas of JURISDICTION 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  11. Contractor Issues 2011 Annual Review

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Savannah River Remediation (SRR), the liquid waste contractor at the Savannah River Site (SRS), has released its 2011 Annual Review available here.

  12. NCAI Annual Convention and Marketplace

    Broader source: Energy.gov [DOE]

    The National Congress of American Indians (NCAI) is hosting their annual convention featuring networking events, breakout sessions on resiliency and workforce development, and guest speakers. Pre...

  13. Tanana Chiefs Conference Annual Convention

    Broader source: Energy.gov [DOE]

    The Tanana Chiefs Conference is hosting its annual convention's theme is "Our Communities, Our Future" and will feature keynote speaker Chief Floyd Green of Rampart.

  14. Historical Natural Gas Annual 1999

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    1999 The Historical Natural Gas Annual contains historical information on supply and disposition of natural gas at the national, regional, and State level as well as prices at...

  15. Annual Energy Review - July 2006

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    5 (Million Short Tons) Energy Information Administration Annual Energy Review 2005 203 Notes: * Production categories are estimated; other data are preliminary. * Values are...

  16. Annual Energy Review - July 2006

    Gasoline and Diesel Fuel Update (EIA)

    5 (Trillion Cubic Feet) Energy Information Administration Annual Energy Review 2005 183 a Natural gas consumed in the operation of pipelines (primarily in compressors), and as...

  17. Annual Energy Review - July 2006

    Gasoline and Diesel Fuel Update (EIA)

    Administration Annual Energy Review 2005 125 a Unfinished oils, other hydrocarbonshydrogen, and motor gasoline and aviation gasoline blending components. b Net Imports (1.04),...

  18. Annual Energy Review 2005

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    2006-07-01

    The Annual Energy Review (AER) is the Energy Information Administration's (EIA) primary report of annual historical energy statistics. For many series, data begin with the year 1949. Included are data on total energy production, consumption, and trade; overviews of petroleum, natural gas, coal, electricity, nuclear energy, renewable energy, international energy, as well as financial and environment indicators; and data unit conversion tables. Publication of this report is required under Public Law 95–91 (Department of Energy Organization Act), Section 205(c), and is in keeping with responsibilities given to the EIA under Section 205(a)(2), which states: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....” The AER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding data series in the AER and in other EIA publications.

  19. Annual Energy Review 2006

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    2007-06-01

    The Annual Energy Review (AER) is the Energy Information Administration's (EIA) primary report of annual historical energy statistics. For many series, data begin with the year 1949. Included are data on total energy production, consumption, and trade; overviews of petroleum, natural gas, coal, electricity, nuclear energy, renewable energy, international energy, as well as financial and environment indicators; and data unit conversion tables. Publication of this report is required under Public Law 95–91 (Department of Energy Organization Act), Section 205(c), and is in keeping with responsibilities given to the EIA under Section 205(a)(2), which states: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....” The AER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding data series in the AER and in other EIA publications.

  20. Annual Energy Review 2004

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    2005-08-01

    The Annual Energy Review (AER) is the Energy Information Administration's (EIA) primary report of annual historical energy statistics. For many series, data begin with the year 1949. Included are data on total energy production, consumption, and trade; overviews of petroleum, natural gas, coal, electricity, nuclear energy, renewable energy, international energy, as well as financial and environment indicators; and data unit conversion tables. Publication of this report is required under Public Law 95–91 (Department of Energy Organization Act), Section 205(c), and is in keeping with responsibilities given to the EIA under Section 205(a)(2), which states: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....” The AER is intended for use by Members of Congress, Federal and State agencies energy analysts, and the general public. EIA welcomes suggestions from readers regarding data series in the AER and in other EIA publications.

  1. Annual Energy Review 2009

    SciTech Connect (OSTI)

    Fichman, Barbara T.

    2010-08-01

    The Annual Energy Review (AER) is the U.S. Energy Information Administration's (EIA) primary report of annual historical energy statistics. For many series, data begin with the year 1949. Included are statistics on total energy production, consumption, trade, and energy prices; overviews of petroleum, natural gas, coal, electricity, nuclear energy, renewable energy, and international energy; financial and environment indicators; and data unit conversions. Publication of this report is required under Public Law 95–91 (Department of Energy Organization Act), Section 205(c), and is in keeping with responsibilities given to the EIA under Section 205(a)(2), which states: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....” The AER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding the content of the AER and other EIA publications.

  2. Annual Energy Review 1993

    SciTech Connect (OSTI)

    Not Available

    1994-07-14

    This twelfth edition of the Annual Energy Review (AER) presents the Energy Information Administration`s historical energy statistics. For most series, statistics are given for every year from 1949 through 1993. Because coverage spans four and a half decades, the statistics in this report are well-suited to long-term trend analyses. The AER is comprehensive. It covers all major energy activities, including consumption, production, trade, stocks, and prices, for all major energy commodities, including fossil fuels and electricity. The AER also presents Energy Information Administration (EIA) statistics on some renewable energy sources. EIA estimates that its consumption series include about half of the renewable energy used in the United States. For a more complete discussion of EIA`s renewables data, see p. xix, ``Introducing Expanded Coverage of Renewable Energy Data Into the Historical Consumption Series.`` Copies of the 1993 edition of the Annual Energy Review may be obtained by using the order form in the back of this publication. Most of the data in the 1993 edition also are available on personal computer diskette. For more information about the diskettes, see the back of this publication. In addition, the data are available as part of the National Economic, Social, and Environmental Data Bank on a CD-ROM. For more information about the data bank, contact the US Department of Commerce Economics and Statistics Administration, on 202-482-1986.

  3. Annual Energy Review 2011

    SciTech Connect (OSTI)

    Fichman, Barbara T.

    2012-09-01

    The Annual Energy Review (AER) is the U.S. Energy Information Administration's (EIA) primary report of annual historical energy statistics. For many series, data begin with the year 1949. Included are statistics on total energy production, consumption, trade, and energy prices; overviews of petroleum, natural gas, coal, electricity, nuclear energy, and renewable energy; financial and environment indicators; and data unit conversions. Publication of this report is required under Public Law 95–91 (Department of Energy Organization Act), Section 205(c), and is in keeping with responsibilities given to the EIA under Section 205(a)(2), which states: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....” The AER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding the content of the AER and other EIA publications.

  4. Electric power annual 1992

    SciTech Connect (OSTI)

    Not Available

    1994-01-06

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  5. Annual site environmental report for calendar year 1988

    SciTech Connect (OSTI)

    1988-12-31

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1988 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,376 miles of transmission lines, 254 substations, and various appurtenant power facilities in the above geographic areas. Western also is responsible for planning, construction, and operation and maintenance of additional Federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service areas. Additionally, Western markets the US entitlement from the large Navajo coal-fired plant near Page, Arizona, and power generated at a wind farm in Wyoming. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

  6. Annual site environmental report for calendar year 1991

    SciTech Connect (OSTI)

    1991-12-31

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,664 miles of transmission lines, 265 substations, and various appurtenant power facilities in fifteen central and western states. Western also is responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

  7. Sandia National Laboratories: News: Publications: Partnerships Annual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report Partnerships Annual Report Annual Report Environmental Reports Fact Sheets Labs Accomplishments Lab News Partnerships Annual Report Research Magazine HPC Annual Reports Search Sandia Publications Strategic Plan News Partnerships Annual Report Partnerships publication cover Highlights Sandia's successes, partners, statistics, and accomplishments. Download the following PDF files for more information. 2014 2013 2012 2011 2010 2009 2008 2007

  8. 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Annual Plan 2007 Annual Plan PDF icon Section 999: 2007 Annual Plan More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program Recommendations: Draft 2008 Section 999 Annual Plan UDAC Meeting - September 2009

  9. Recommendations: 2010 Annual Plan | Department of Energy

    Energy Savers [EERE]

    0 Annual Plan Recommendations: 2010 Annual Plan PDF icon URTAC - Recommendations on 2010 Section 999 Annual Plan More Documents & Publications URTAC Meeting - December 18, 2013 2009 Annual Plan 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program

  10. Recommendations: 2011 Annual Plan | Department of Energy

    Energy Savers [EERE]

    2011 Annual Plan Recommendations: 2011 Annual Plan URTAC - Recommendations on 2011 Section 999 Annual Plan PDF icon URTAC Recommendations on 2011 Section 999 Annual Plan More Documents & Publications URTAC Meeting - December 18, 2013 Recommendations: 2010 Annual Plan Recommendations: Draft 2012

  11. Recommendations: Draft Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan Recommendations: Draft Annual Plan Section 999 Annual Plan PDF icon Recommendations on Draft 2014 Section 999 Annual Plan More Documents & Publications URTAC Meeting - December 18, 2013 Committee Report for December 18, 2013 Meeting Recommendations: Draft 2013 Annual Plan

  12. Annual Energy Review 1999

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    2000-07-01

    A generation ago the Ford Foundation convened a group of experts to explore and assess the Nation’s energy future, and published their conclusions in A Time To Choose: America’s Energy Future (Cambridge, MA: Ballinger, 1974). The Energy Policy Project developed scenarios of U.S. potential energy use in 1985 and 2000. Now, with 1985 well behind us and 2000 nearly on the record books, it may be of interest to take a look back to see what actually happened and consider what it means for our future. The study group sketched three primary scenarios with differing assumptions about the growth of energy use. The Historical Growth scenario assumed that U.S. energy consumption would continue to expand by 3.4 percent per year, the average rate from 1950 to 1970. This scenario assumed no intentional efforts to change the pattern of consumption, only efforts to encourage development of our energy supply. The Technical Fix scenario anticipated a “conscious national effort to use energy more efficiently through engineering know-how." The Zero Energy Growth scenario, while not clamping down on the economy or calling for austerity, incorporated the Technical Fix efficiencies plus additional efficiencies. This third path anticipated that economic growth would depend less on energy-intensive industries and more on those that require less energy, i.e., the service sector. In 2000, total energy consumption was projected to be 187 quadrillion British thermal units (Btu) in the Historical Growth case, 124 quadrillion Btu in the Technical Fix case, and 100 quadrillion Btu in the Zero Energy Growth case. The Annual Energy Review 1999 reports a preliminary total consumption for 1999 of 97 quadrillion Btu (see Table 1.1), and the Energy Information Administration’s Short-Term Energy Outlook (April 2000) forecasts total energy consumption of 98 quadrillion Btu in 2000. What energy consumption path did the United States actually travel to get from 1974, when the scenarios were drawn, to the end of the century? What happened to the relationship between growth and energy consumption? How did the fuel mix change over this period? What are the effects of energy usage on our environment? What level of consumption will the United States—and the world—record in the Annual Energy Review 2025? We present this edition of the Annual Energy Review to help investigate these important questions and to stimulate and inform our thinking about what the future holds.

  13. Annual Site Environmental Report Summary Pamphlet Sandia National Laboratories,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Reports Annual Reports Note: Some of the following documents are in PDF and will require Adobe Reader for viewing. Freedom of Information Act Annual Reports Annual Report for 2015 Annual Report for 2014 Annual Report for 2013 Annual Report for 2012 Annual Report for 2011 Annual Report for 2010 Annual Report for 2009 Annual Report for 2008 (pdf) Annual Report for 2007 (pdf) Annual Report for 2006 (pdf) Annual Report for 2005 (pdf) Annual Report for 2004 (pdf) Annual Report for 2003 (pdf)

  14. LM Annual NEPA Planning Summary 2015 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    LM Annual NEPA Planning Summary 2015 More Documents & Publications 2015 Annual NEPA Planning Summaries Annual NEPA Planning Summary Report Template 2013 Annual Planning Summary for...

  15. OHA 2009 ANNUAL REPORT FINAL

    Energy Savers [EERE]

    Annual Report O H A ffice of earings ppeals & O H A ffice of earin s ppeals & g Doe/hg-0021 U.S. DEPARTMENT OF ENERGY Office of Hearings Appeals & FY 2009 Annual Report Message from the Director . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ntroduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 I.

  16. OHA 2011 ANNUAL REPORT FINAL

    Energy Savers [EERE]

    Annual Report O H A ffice of earings ppeals & O H A ffice of earin s ppeals & g Doe/hg-0023 U.S. DEPARTMENT OF ENERGY Office of Hearings Appeals & FY 2011 Annual Report Message from the Director . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I.

  17. OHA 2012 ANNUAL REPORT DRAFT....

    Energy Savers [EERE]

    Annual Report O H A ffice of earin s ppeals & g Doe/hg-0024 U.S. DEPARTMENT OF ENERGY Office of Hearings Appeals & FY 2012 Annual Report Message from the Director . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I. Areas of JURISDICTION II. Working with

  18. Annual Energy Outlook Retrospective Review

    Reports and Publications (EIA)

    2015-01-01

    The Annual Energy Outlook Retrospective Review provides a yearly comparison between realized energy outcomes and the Reference case projections included in previous Annual Energy Outlooks (AEO) beginning with 1982. This edition of the report adds the AEO 2012 projections and updates the historical data to incorporate the latest data revisions.

  19. Current Annualized Request

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Organization FY 2012 FY 2013 FY 2014 Current Annualized Request CR $ % National Security Weapons Activities* 7,214,834 7,557,342 7,868,409 +311,067 +4.1% Defense Nuclear Nonproliferation 2,300,950 2,409,930 2,140,142 -160,808 -7.0% Naval Reactors 1,080,000 1,086,610 1,246,134 +166,134 +15.4% Office of the Administrator 410,000 412,509 397,784 -12,216 -3.0% Total, National Nuclear Security Administration 11,005,784 11,466,391 11,652,469 +304,177 +2.8% Energy and Environment Energy Efficiency and

  20. Annual energy review 1994

    SciTech Connect (OSTI)

    1995-07-01

    This 13th edition presents the Energy Information Administration`s historical energy statistics. For most series, statistics are given for every year from 1949 through 1994; thus, this report is well-suited to long-term trend analyses. It covers all major energy activities, including consumption, production, trade, stocks, and prices for all major energy commodities, including fossil fuels and electricity. Statistics on renewable energy sources are also included: this year, for the first time, usage of renewables by other consumers as well as by electric utilities is included. Also new is a two-part, comprehensive presentation of data on petroleum products supplied by sector for 1949 through 1994. Data from electric utilities and nonutilities are integrated as ``electric power industry`` data; nonutility power gross generation are presented for the first time. One section presents international statistics (for more detail see EIA`s International Energy Annual).

  1. Uranium Marketing Annual Report -

    Gasoline and Diesel Fuel Update (EIA)

    5. Shipments of uranium feed by owners and operators of U.S. civilian nuclear power reactors to domestic and foreign enrichment suppliers, 2015-24 thousand pounds U3O8 equivalent Amount of feed to be shipped Change from 2013 to 2014 Year of shipment As of December 31, 2013 As of December 31, 2014 Annual Cumulative 2015 45,498 48,206 2,708 2,708 2016 48,693 46,529 -2,164 544 2017 47,005 49,924 2,919 3,463 2018 52,138 51,169 -969 2,494 2019 50,041 46,184 -3,857 -1,363 2020 49,726 49,598 -128

  2. Petroleum marketing annual 1993

    SciTech Connect (OSTI)

    Not Available

    1995-01-01

    The Petroleum Marketing Annual (PMA) contains statistical data on a variety of crude oils and refined petroleum products. The publication provides statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the free-on-board (f.o.b.) and landed cost of imported crude oil, and the refiners acquisition cost of crude oil. Sales data for motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane are presented. For this publication, all estimates have been recalculated since their earlier publication in the Petroleum Marketing Monthly (PMM). These calculations made use of additional data and corrections that were received after the PMM publication dates.

  3. Coal industry annual 1993

    SciTech Connect (OSTI)

    Not Available

    1994-12-06

    Coal Industry Annual 1993 replaces the publication Coal Production (DOE/FIA-0125). This report presents additional tables and expanded versions of tables previously presented in Coal Production, including production, number of mines, Productivity, employment, productive capacity, and recoverable reserves. This report also presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for a wide audience including the Congress, Federal and State agencies, the coal industry, and the general public. In addition, Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility Power Producers who are not in the manufacturing, agriculture, mining, construction, or commercial sectors. This consumption is estimated to be 5 million short tons in 1993.

  4. Uranium industry annual 1996

    SciTech Connect (OSTI)

    1997-04-01

    The Uranium Industry Annual 1996 (UIA 1996) provides current statistical data on the US uranium industry`s activities relating to uranium raw materials and uranium marketing. The UIA 1996 is prepared for use by the Congress, Federal and State agencies, the uranium and nuclear electric utility industries, and the public. Data on uranium raw materials activities for 1987 through 1996 including exploration activities and expenditures, EIA-estimated reserves, mine production of uranium, production of uranium concentrate, and industry employment are presented in Chapter 1. Data on uranium marketing activities for 1994 through 2006, including purchases of uranium and enrichment services, enrichment feed deliveries, uranium fuel assemblies, filled and unfilled market requirements, uranium imports and exports, and uranium inventories are shown in Chapter 2. A feature article, The Role of Thorium in Nuclear Energy, is included. 24 figs., 56 tabs.

  5. Uranium Industry Annual, 1992

    SciTech Connect (OSTI)

    Not Available

    1993-10-28

    The Uranium Industry Annual provides current statistical data on the US uranium industry for the Congress, Federal and State agencies, the uranium and electric utility industries, and the public. The feature article, ``Decommissioning of US Conventional Uranium Production Centers,`` is included. Data on uranium raw materials activities including exploration activities and expenditures, resources and reserves, mine production of uranium, production of uranium concentrate, and industry employment are presented in Chapter 1. Data on uranium marketing activities including domestic uranium purchases, commitments by utilities, procurement arrangements, uranium imports under purchase contracts and exports, deliveries to enrichment suppliers, inventories, secondary market activities, utility market requirements, and uranium for sale by domestic suppliers are presented in Chapter 2.

  6. GSA 2016 Annual Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GSA 2016 Annual Meeting GSA 2016 Annual Meeting September 25, 2016 8:00AM EDT to September 28, 2016 5:00AM EDT GSA 2016 Annual Meeting Denver, Colorado http://www.geosociety.org/meetings/

  7. An automated neutron monitor maintenance system

    SciTech Connect (OSTI)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-09-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  8. Operations and Maintenance Savings from Advanced Metering Infrastructure - Initial Results

    Energy Savers [EERE]

    Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Following these best practices can help agencies gain management buy-in for O&M programs and save an estimated 5% to 20% on energy bills without a significant capital

  9. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintaining Your Air Conditioner Maintaining Your Air Conditioner Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. An air conditioner's filters, coils, and fins require regular maintenance for the unit to function effectively and efficiently throughout its years of service. Neglecting necessary

  10. EERE Annual Website Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Website Reports EERE Annual Website Reports For each fiscal year, EERE reports on its website activities and overall Web analytics. For other EERE overall and EERE Office Web statistic reports from FY 2007-FY 2011, see EERE's Statistics Archives. PDF icon EERE Annual Web Report: Fiscal Year 2015 - Full Version PDF icon EERE Annual Web Report: Fiscal Year 2014 - Full Version PDF icon EERE Annual Web Report: Fiscal Year 2013 - Full Version PDF icon EERE Annual Web Report: Fiscal Year 2012 -

  11. DOE-STD-1181-2004; Facility Maintenance Management Functional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... maintenance management personnel shall demonstrate a working level knowledge of industrial property management practices as related to stores, spare parts, and essential materials. ...

  12. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in an efficient manner and that operations and maintenance personnel are well trained. ... or system (lumens per watt) Energy management system - A microprocessor-based system ...

  13. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    SciTech Connect (OSTI)

    Hendrickson, D.W. [ed.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  14. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: LED, ssl, solid-state, lighting, GATEWAY, CALiPER, report, color, shift, maintenance Word Cloud More Like This Full ...

  15. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Royer, Michael P.; Tuttle, Ralph; Rosenfeld, Scott M.; Miller, Naomi J. Light-emitting diode (LED), color shift, color stability, color maintenance, warranty Light-emitting...

  16. Community Wind Handbook/Plan for Maintenance | Open Energy Information

    Open Energy Info (EERE)

    Community Wind HandbookPlan for Maintenance < Community Wind Handbook Jump to: navigation, search WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHCommunity Wind Handbook...

  17. Operations and Maintenance Best Practices--A Guide to Achieving...

    Office of Scientific and Technical Information (OSTI)

    This guide is designed to serve as a source for O&M management and technical staff. It ... OPERATION; EFFICIENCY; MAINTENANCE; MANAGEMENT; RECOMMENDATIONS Word Cloud More Like ...

  18. Annual DOE Occupational Radiation Exposure Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    employees during 1985. May 19, 2006 Annual DOE Occupational Radiation Exposure | 1984 Report The Seventeenth Annual Report of Radiation Exposures for DOE & DOE Contractor...

  19. Stewardship Science Academic Programs Annual | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Stewardship Science Academic Programs Annual To achieve our mission objectives, the Office of Research, Development, Test and Evaluation annually invests resources in ...

  20. Postdoctoral Research Awards Annual Research Meeting: Brandon...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Brandon Mercado Postdoctoral Research Awards Annual Research Meeting: Brandon Mercado Poster Presentation at 2012 EERE Annual Research Meeting, Postdoctoral Research Awards, from ...

  1. Postdoctoral Research Awards Annual Research Meeting: Padmaja...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Padmaja Gunda Postdoctoral Research Awards Annual Research Meeting: Padmaja Gunda Poster Presentation at 2012 EERE Annual Research Meeting, Postdoctoral Research Awards, from the ...

  2. Postdoctoral Research Awards Annual Research Meeting: Joseph...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Joseph Mondloch Postdoctoral Research Awards Annual Research Meeting: Joseph Mondloch Postdoctoral Research Awards Annual Research Meeting: Joseph Mondloch poster presentation. PDF ...

  3. Presidential Permit Holders - Annual Reports | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permit Holders - Annual Reports Presidential Permit Holders - Annual Reports Presidential permit holders are responsible for reporting the gross amount electric energy which flows ...

  4. 2015 Annual Technical Exchange Meeting Presenters Biographical...

    Office of Environmental Management (EM)

    Sketches 2015 Annual Technical Exchange Meeting Presenters Biographical Sketches Interagency Performance & Risk Assessment Community of Practice (P&RA CoP) 2015 Annual ...

  5. Annual Energy Outlook 2015 - Appendix A

    Gasoline and Diesel Fuel Update (EIA)

    Administration | Annual Energy Outlook 2015 Reference case Energy Information Administration Annual Energy Outlook 2015 Table A15. Coal supply, disposition, and prices ...

  6. Annual Planning Summaries: 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Annual Planning Summaries: 2014 January 20, 2014 2014 Annual Planning Summary for the Environmental Management Energy Technology Engineering Center The ongoing and projected...

  7. NDOT - Application Information for Evaluating Annual Permit ...

    Open Energy Info (EERE)

    - Application Information for Evaluating Annual Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: NDOT - Application Information for Evaluating Annual...

  8. Annual Planning Summaries: 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the Argonne Site Office The ongoing and projected Environmental Assessments and Environmental...

  9. Annual Technology Baseline (Including Supporting Data); NREL...

    Office of Scientific and Technical Information (OSTI)

    Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory) Citation Details In-Document Search Title: Annual Technology Baseline ...

  10. 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program...

  11. Derived Annual Estimates of Manufacturing Energy Consumption...

    U.S. Energy Information Administration (EIA) Indexed Site

    > Derived Annual Estimates - Executive Summary Derived Annual Estimates of Manufacturing Energy Consumption, 1974-1988 Figure showing Derived Estimates Executive Summary This...

  12. Microsoft Word - S08846_2012_Annual_IC report

    Office of Legacy Management (LM)

    ... Cleanups (EPA 2005). U.S. Department of Energy Annual Assessment of the Effectiveness of ... 2. Prohibit the extraction or consumption of, exposure to, or the use in any way ...

  13. Annual Energy Review 2002

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    2003-10-01

    The Annual Energy Review (AER) presents the Energy Information Administration’s historical energy statistics. For many series, statistics are given for every year from 1949 through 2002. The statistics, expressed in either physical units or British thermal units, cover all major energy activities, including consumption, production, trade, stocks, and prices, for all major energy commodities, including fossil fuels, electricity, and renewable energy sources. Publication of this report is required under Public Law 95–91 (Department of Energy Organization Act), Section 205(c), and is in keeping with responsibilities given to the Energy Information Administration (EIA) under Section 205(a)(2), which states: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....” The AER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding data series in the AER and in other EIA publications. Related Publication: Readers of the AER may also be interested in EIA’s Monthly Energy Review, which presents monthly updates of many of the data in the AER. Contact our National Energy Information Center for more information.

  14. Annual Energy Review 1997

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    1998-07-01

    The Annual Energy Review (AER) presents the Energy Information Administration’s historical energy statistics. For many series, statistics are given for every year from 1949 through 1997. The statistics, expressed in either physical units or British thermal units, cover all major energy activities, including consumption, production, trade, stocks, and prices, for all major energy commodities, including fossil fuels, electricity, and renewable energy sources. Publication of this report is in keeping with responsibilities given to the Energy Information Administration (EIA) in Public Law 95–91 (Department of Energy Organization Act), which states, in part, in Section 205(a)(2) that: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....” The AER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding data series in the AER and in other EIA publications.

  15. Annual Energy Review 2000

    SciTech Connect (OSTI)

    Seiferlein, Katherine E.

    2001-08-01

    The Annual Energy Review (AER) presents the Energy Information Administration’s historical energy statistics. For many series, statistics are given for every year from 1949 through 2000. The statistics, expressed in either physical units or British thermal units, cover all major energy activities, including consumption, production, trade, stocks, and prices, for all major energy commodities, including fossil fuels, electricity, and renewable energy sources. Publication of this report is required under Public Law 95–91 (Department of Energy Organization Act), Section 205(c), and is in keeping with responsibilities given to the Energy Information Administration under Section 205(a)(2), which states: “The Administrator shall be responsible for carrying out a central, comprehensive, and unified energy data and information program which will collect, evaluate, assemble, analyze, and disseminate data and information....” The AER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding data series in the AER and in other EIA publications.

  16. 2007 LDRD ANNUAL REPORT

    SciTech Connect (OSTI)

    French, T

    2008-12-16

    I am pleased to present the fiscal year 2007 Laboratory Directed Research and Development (LDRD) annual report. This represents the first year that SRNL has been eligible for LDRD participation and our results to date demonstrate we are off to an excellent start. SRNL became a National Laboratory in 2004, and was designated the 'Corporate Laboratory' for the DOE Office of Environmental Management (EM) in 2006. As you will see, we have made great progress since these designations. The LDRD program is one of the tools SRNL is using to enable achievement of our strategic goals for the DOE. The LDRD program allows the laboratory to blend a strong basic science component into our applied technical portfolio. This blending of science with applied technology provides opportunities for our scientists to strengthen our capabilities and delivery. The LDRD program is vital to help SRNL attract and retain leading scientists and engineers who will help build SRNL's future and achieve DOE mission objectives. This program has stimulated our research staff creativity, while realizing benefits from their participation. This investment will yield long term dividends to the DOE in its Environmental Management, Energy, and National Security missions.

  17. Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plan | Department of Energy 2 Annual Performance Report and FY 2003 Annual Performance Plan Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2002 actual performance and FY 2003 planned activities. PDF icon Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan More Documents & Publications Annual Performance

  18. ITCN 49th Annual Convention

    Broader source: Energy.gov [DOE]

    The Inter-Tribal Council of Nevada, Inc. will be hosting its 49th Annual Convention, themed "Making a Difference for Nevada Tribes," December 8-11, 2014 at John Ascuaga’s Nugget in Sparks, Nevada.

  19. LLNL NESHAPs 2004 Annual Report

    SciTech Connect (OSTI)

    Harrach, R; Gallegos, G; Peterson, R; Wilson, K; Harrach, R J; Gallegos, G M; Peterson, S R; Wilson, K R

    2005-06-27

    This annual report is prepared pursuant to the National Emission Standards for Hazardous Air Pollutants (NESHAPs; Title 40 Code of Federal Regulations [CFR] Part 61, Subpart H). Subpart H governs radionuclide emissions to air from Department of Energy (DOE) facilities.

  20. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Uranium Marketing Annual Report May 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | 2015 Uranium Marketing Annual Report i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States

  1. 2015 Uranium Marketing Annual Report

    U.S. Energy Information Administration (EIA) Indexed Site

    2 U.S. Energy Information Administration / 2015 Uranium Marketing Annual Report 2015 Uranium Marketing Annual Report Release Date: May 24, 2016 Next Release Date: May 2017 2013 2014 2015 American Fuel Resources, LLC Advance Uranium Asset Management Ltd. AREVA / AREVA NC, Inc. AREVA NC, Inc. AREVA / AREVA NC, Inc. ARMZ (AtomRedMetZoloto) BHP Billiton Olympic Dam Corporation Pty Ltd ARMZ (AtomRedMetZoloto) BHP Billiton Olympic Dam Corporation Pty Ltd CAMECO BHP Billiton Olympic Dam Corporation Pty

  2. Annual Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Meetings Annual Meetings EERE Postdoctoral Awardees are given an opportunity each year to present their research and interact with the larger US renewable energy community. SunShot Postdoctoral Award recipients are invited to present and participate in the SunShot Grand Challenge Summit, which takes place every 2 years. The next meeting will be held in 2018. EERE Postdoctoral Research Awards 2012 Meeting February 27, 2012 Posters Photo of Jared Clark. Jared Clark Biomass Photo of Padmaja

  3. Annual energy review 1997

    SciTech Connect (OSTI)

    1998-07-01

    The Annual Energy Review (AER) is a historical data report that tells many stories. It describes, in numbers, the changes that have occurred in US energy markets since the midpoint of the 20th century. In many cases, those markets differ vastly from those of a half-century ago. By studying the graphs and data tables presented in this report, readers can learn about past energy supply and usage in the United States and gain an understanding of the issues in energy and the environment now before use. While most of this year`s report content is similar to last year`s, there are some noteworthy developments. Table 1.1 has been restructured into more summarized groupings -- fossil fuels, nuclear electric power, and renewable energy -- to aid analysts in their examination of the basic trends in those broad categories. Readers` attention is also directed to the electricity section, where considerable reformatting of the tables and graphs has been carried out to help clarify past and recent trends in the electric power industry as it enters a period of radical restructuring. Table 9.1, which summarizes US nuclear generating units, has been redeveloped to cover the entire history of the industry in this country and to provide categories relevant in assessing the future of the industry, such as the numbers of ordered generating units that have been canceled and those that were built and later shut down. In general, the AER emphasizes domestic energy statistics. Sections 1 through 10 and Section 12 are devoted mostly to US data; Section 11 reports on international statistics and world totals. 140 figs., 141 tabs.

  4. Annual energy review 2003

    SciTech Connect (OSTI)

    Seiferlein, Katherin E.

    2004-09-30

    The Annual Energy Review 2003 is a statistical history of energy activities in the United States in modern times. Data are presented for all major forms of energy by production (extraction of energy from the earth, water, and other parts of the environment), consumption by end-user sector, trade with other nations, storage changes, and pricing. Much of the data provided covers the fossil fuels—coal, petroleum, and natural gas. Fossil fuels are nature’s batteries; they have stored the sun’s energy over millennia past. It is primarily that captured energy that we are drawing on today to fuel the activities of the modern economy. Data in this report measure the extraordinary expansion of our use of fossil fuels from 29 quadrillion British thermal units (Btu) in 1949 to 84 quadrillion Btu in 2003. In recent years, fossil fuels accounted for 86 percent of all energy consumed in the United States. This report also records the development of an entirely new energy industry—the nuclear electric power industry. The industry got its start in this country in 1957 when the Shippingport, Pennsylvania, nuclear electric power plant came on line. Since that time, the industry has grown to account for 20 percent of our electrical output and 8 percent of all energy used in the country. Renewable energy is a third major category of energy reported in this volume. Unlike fossil fuels, which are finite in supply, renewable energy is essentially inexhaustible because it can be replenished. Types of energy covered in the renewable category include conventional hydroelectric power, which is power derived from falling water; wood; waste; alcohol fuels; geothermal; solar; and wind. Together, these forms of energy accounted for about 6 percent of all U.S. energy consumption in recent years.

  5. 2011 Annual Site Environmental Report (ASER) | Department of Energy

    Energy Savers [EERE]

    2011 Annual Site Environmental Report (ASER) 2011 Annual Site Environmental Report (ASER) PDF icon 2011 ASER More Documents & Publications 2014 ANNUAL SITE ENVIRONMENTAL REPORT (ASER) 2010 Annual Site Environmental Report (ASER) 2012 Annual Site Environmental Report (ASER)

  6. LM Annual Post Competition Accountability Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LM Annual Post Competition Accountability Reports LM Annual Post Competition Accountability Reports Third Annual Post Competition Accountability Report Second Annual Post Competition Accountability Report First Annual Post Competition Accountability Report

  7. Annual Performance Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Reports Annual Performance Reports The Annual Performance Report provides key performance information that demonstrates DOE's accountability to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. These reports are produced as an alternative to the Performance and Accountability Report. Documents Available for Download March 29, 2016 FY 2015 Annual Performance Report

  8. Energy Information Administration/Petroleum Marketing Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    . . . . . . . . . . . . . . . . - 49 392 Energy Information AdministrationPetroleum Marketing Annual 1998 Kerosene refiners . . . . . . . . . . . . . . . . . . . . . . . . . . ....

  9. Energy Information Administration/Petroleum Marketing Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    . . . . . . . . . . . . . . . . - 49 392 Energy Information AdministrationPetroleum Marketing Annual 1999 Kerosene refiners . . . . . . . . . . . . . . . . . . . . . . . . . . ....

  10. Monthly/Annual Energy Review - nuclear section

    Reports and Publications (EIA)

    2015-01-01

    Monthly and latest annual statistics on nuclear electricity capacity, generation, and number of operable nuclear reactors.

  11. 2012 Annual Report Research Reactor Infrastructure Program

    SciTech Connect (OSTI)

    Douglas Morrell

    2012-11-01

    The content of this report is the 2012 Annual Report for the Research Reactor Infrastructure Program.

  12. Economic analysis of solar industrial process heat systems: a methodology to determine annual required revenue and internal rate of return

    SciTech Connect (OSTI)

    Dickinson, W.C.; Brown, K.C.

    1981-08-11

    To permit an economic evaluation of solar industrial process heat systems, a methodology was developed to determine the annual required revenue and the internal rate of return. First, a format is provided to estimate the solar system's installed cost, annual operating and maintenance expenses, and net annual solar energy delivered to the industrial process. Then an expression is presented that gives the annual required revenue and the price of solar energy. The economic attractiveness of the potential solar investment can be determined by comparing the price of solar energy with the price of fossil fuel, both expressed in levelized terms. This requires calculation of the internal rate of return on the solar investment or, in certain cases, the growth rate of return.

  13. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  14. Sandia National Laboratories: News: Publications: Annual Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Report Annual Report Archive Environmental Reports Fact Sheets Labs Accomplishments Lab News Partnerships Annual Report Research Magazine HPC Annual Reports Search Sandia Publications Strategic Plan News Annual Report Sandia's Perspectives report provides an overview of the labs, highlighting new programs, technologies, and community activities. Perspectives 2012 Perspectives Cover In this Issue Letter from Paul Hommert Our Mission Sandia Core Values Anticipate and Solve the Nation's Most

  15. Materials for Advanced Ultrasupercritical Steam Turbines Task 3: Materials for Non-Welded Rotors, Buckets, and BoltingMaterials for Advanced Ultrasupercritical Steam Turbines

    SciTech Connect (OSTI)

    Saha, Deepak

    2015-09-15

    The primary objective of the task was to characterize the materials suitable for mechanically coupled rotor, buckets and bolting operating with an inlet temperature of 760°C (1400°F). A previous study DOE-FC26-05NT42442, identified alloys such as Haynes®282®, Nimonic 105, Inconel 740, Waspaloy, Nimonic 263, and Inconel 617 as potential alloys that met the requirements for the necessary operating conditions. Of all the identified materials, Waspaloy has been widely utilized in the aviation industry in the form of disk and other smaller forgings, and sufficient material properties and vendor experience exist, for the design and manufacture of large components. The European program characterizing materials for A-USC conditions are evaluating Nimonic 263 and Inconel 617 for large components. Inconel 740 has been studied extensively as a part of the boiler consortium and is code approved. Therefore, the consortium focused efforts in the development of material properties for Haynes®282® and Nimonic 105 to avoid replicative efforts and provide material choices/trade off during the detailed design of large components. Commercially available Nimonic 105 and Haynes®282® were evaluated for microstructural stability by long term thermal exposure studies. Material properties requisite for design such as tensile, creep / rupture, low cycle fatigue, high cycle fatigue, fatigue crack growth rate, hold-time fatigue, fracture toughness, and stress relaxation are documented in this report. A key requisite for the success of the program was a need demonstrate the successful scale up of the down-selected alloys, to large components. All property evaluations in the past were performed on commercially available bar/billet forms. Components in power plant equipment such as rotors and castings are several orders in magnitude larger and there is a real need to resolve the scalability issue. Nimonic 105 contains high volume fraction y’ [>50%], and hence the alloy is best suited for smaller forging and valve internals, bolts, smaller blades. Larger Nimonic 105 forgings, would precipitate y’ during the surface cooling during forging, leading to surface cracks. The associate costs in forging Nimonic 105 to larger sizes [hotter dies, press requirements], were beyond the scope of this task and not investigated further. Haynes®282® has 20 - 25% volume fraction y’ was a choice for large components, albeit untested. A larger ingot diameter is pre-requisite for a larger diameter forging and achieves the “typically” accepted working ratio of 2.5-3:1. However, Haynes®282® is manufactured via a double melt process [VIM-ESR] limited by size [<18-16” diameter], which limited the maximum size of the final forging. The report documents the development of a 24” diameter triple melt ingot, surpassing the current available technology. A second triple melt ingot was manufactured and successfully forged into a 44” diameter disk. The successful developments in triple melting process and the large diameter forging of Haynes®282® resolved the scalability issues and involved the first of its kind attempt in the world for this alloy. The complete characterization of Haynes®282® forging was performed and documented in this report. The dataset from the commercially available Haynes®282® [grain size ASTM 3-4] and the finer grain size disk forging [ASTM 8-9] offer an additional design tradeoff to balance creep and fatigue during the future design process.

  16. Microsoft Word - S08846_2012_Annual_IC report

    Office of Legacy Management (LM)

    Photos of T Building Red Concrete Cracks This page intentionally left blank U.S. Department of Energy Annual Assessment of the Effectiveness of Site-Wide Institutional Controls June 2012 Doc. No. S08846 Page E-1 E1. 2012 Photos of Red Concrete Cracks The following photographs in Table E-1 were taken to document the baseline condition of the cracks in the red concrete in specified rooms in T Building. The room diagram in Figure E-1 indicates the location of the cracks labeled A through I. Annual

  17. Hopper scheduled maintenance tomorrow (Sept 19) and /project outage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and /project outage Hopper scheduled maintenance tomorrow (Sept 19) and /project outage September 18, 2012 by Helen He There will be a scheduled hardware and software maintenance for Hopper next Wednesday, Sept 19, from 6:30 am to midnight Pacific time. Please plan your work accordingly and check the NERSC Message of the Day (MOTD) for status update: http://www.nersc.gov/live-status/motd/. The /project file system (also known as /global/project) will be

  18. Maintenance study for W-340 Waste Retrieval System

    SciTech Connect (OSTI)

    Christensen, C.; Conner, C.C.; Sekot, J.P.

    1994-05-01

    This study was performed to identify attributes and maintainability requirements for the Tank Waste Retrieval System (TWRS). The system will be developed for Westinghouse Hanford Company in Richland, Washington, as an integrated system to perform waste removal in Tank C-106 and, thus, demonstrate technologies for tank remediation that will satisfy requirements of the Tri-Party Agreement. The study examines attributes of the TWRS, scope of maintenance operations required for the TWRS, maintenance requirements, and potential methods of performing maintenance functions. Recommendations are provided for consideration in the development of both the conceptual design and performance specification, which will be used in procuring the W-340 Waste Retrieval System.

  19. Umatilla River Subbasin Fish Habitat Improvement; 1995 Annual Report.

    SciTech Connect (OSTI)

    Laws, Troy S.

    1996-06-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife`s Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: (1) Flood damage assessment of project leases after the May 1995 and November 1995 floods, (2) reconstruction of 0.75 miles of riparian fence, (3) inspection and routine maintenance of 14.8 miles of fence, (4) collection of approximately 55,000 native willow and cottonwood cuttings and installation of approximately 21,600 of these material, (5) implementation of two bioengineering projects and initiation of a third project, (6) installation of approximately 30 tree/rootwads for fish habitat enhancement, (7) removal of an abandoned flood irrigation dam/fish barrier, (8) collection and summarization of physical and biological monitoring data, and (9) extensive interagency coordination.

  20. Umatilla River Subbasin Fish Habitat Improvement; 1994 Annual Report.

    SciTech Connect (OSTI)

    Laws, Troy S.

    1995-06-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife`s Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: 1) Flood damage assessment of project leases after the May 1994 flood, 2) reconstruction of 1.25 miles of high tensile steel fence, 3) inspection and routine maintenance of 14.8 miles of fence, 4) collection of approximately 6,600 cottonwood and willow cuttings for transplanting in spring of 1995, 5) establishment of three bioengineered habitat restoration demonstration projects, 6) Implementation of a streambank stabilization workshop (bioengineering techniques) for Umatilla Basin residents and resource agency personnel, 7) collection and summarization of physical and biological monitoring data, and 8) extensive interagency coordination.

  1. Fuel performance annual report for 1991. Volume 9

    SciTech Connect (OSTI)

    Painter, C.L.; Alvis, J.M.; Beyer, C.E.; Marion, A.L.; Payne, G.A.; Kendrick, E.D.

    1994-08-01

    This report is the fourteenth in a series that provides a compilation of information regarding commercial nuclear fuel performance. The series of annual reports were developed as a result of interest expressed by the public, advising bodies, and the US Nuclear Regulatory Commission (NRC) for public availability of information pertaining to commercial nuclear fuel performance. During 1991, the nuclear industry`s focus regarding fuel continued to be on extending burnup while maintaining fuel rod reliability. Utilities realize that high-burnup fuel reduces the amount of generated spent fuel, reduces fuel costs, reduces operational and maintenance costs, and improves plant capacity factors by extending operating cycles. Brief summaries of fuel operating experience, fuel design changes, fuel surveillance programs, high-burnup experience, problem areas, and items of general significance are provided.

  2. Southeastern Power Administration 2007 Annual Report

    SciTech Connect (OSTI)

    2007-12-28

    Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

  3. Southeastern Power Administration 2008 Annual Report

    SciTech Connect (OSTI)

    2008-12-29

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agency’s programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers’ contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeastern’s cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our region’s water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeastern’s employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  4. Southeastern Power Administration 2011 Annual Report

    SciTech Connect (OSTI)

    2011-12-31

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2011 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2010, and ending September 31, 2011. This past year, Southeastern marketed approximately 6.2 billion kilowatt-hours of energy to 489 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled more than $264 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2011. This funding, which totaled more than $45 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Currently, there are more than 214 customers participating in the funding efforts in the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems of projects. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rain placed strains on our natural and financial resources. Power purchases for FY 2011 totaled approximately $38 million. About $9 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast.

  5. Southeastern Power Administration 2012 Annual Report

    SciTech Connect (OSTI)

    2012-01-01

    Dear Secretary Moniz: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2012 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012. This past year, Southeastern marketed approximately 5.4 billion kilowatt-hours of energy to 487 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled about $263 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2012. Currently, there are more than 214 customers participating in funding infrastructure renewal efforts of powerplants feeding the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems. This funding, which totaled more than $71 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rainfall strained our natural and financial resources. Power purchases for FY 2012 in the Georgia-Alabama-South Carolina System totaled approximately $29 million. About $8 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast. Sincerely, Kenneth E. Legg Administrator

  6. Kennecott Utah Copper Corporation: Facility Utilizes Energy Assessments to Identify $930,000 in Potential Annual Savings

    SciTech Connect (OSTI)

    2004-07-01

    Kennecott Utah Copper Corporation (KUCC) used targeted energy assessments in the smelter and refinery at its Bingham Canyon Mine, near Salt Lake City, Utah. The assessment focused mainly on the energy-intensive processes of copper smelting and refining. By implementing the projects identified, KUCC could realize annual cost savings of $930,000 and annual energy savings of 452,000 MMBtu. The projects would also reduce maintenance, repair costs, waste, and environmental emissions. One project would use methane gas from an adjacent municipal dump to replace natural gas currently used to heat the refinery electrolyte.

  7. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  8. LM Annual NEPA Planning Summary 2014 | Department of Energy

    Office of Environmental Management (EM)

    Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 PDF icon LM Annual NEPA Planning Summary 2014 More Documents & Publications 2013 Annual Planning Summary for the Office of Fossil Energy 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION LM Annual NEPA Planning Summary 20

  9. C:\\ANNUAL\\Vol2chps.v8\\ANNUAL2.VP

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    168 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 Energy ...

  10. C:\\ANNUAL\\Vol2chps.v8\\ANNUAL2.VP

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    6 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 38. ...

  11. C:\\ANNUAL\\Vol2chps.v8\\ANNUAL2.VP

    Gasoline and Diesel Fuel Update (EIA)

    62 Energy Information Administration Historical Natural Gas Annual 1930 Through Energy Information Administration Historical Natural Gas Annual 1930 Through 1 8. Movements of ...

  12. C:\\ANNUAL\\Vol2chps.v8\\ANNUAL2.VP

    Gasoline and Diesel Fuel Update (EIA)

    2 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 37. ...

  13. C:\\ANNUAL\\Vol2chps.v8\\ANNUAL2.VP

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    134 Energy Information Administration Historical Natural Gas Annual 1930 Through 1999 Energy Information Administration Historical Natural Gas Annual 1930 Through 2000 13. ...

  14. Geothermal Resources Council Annual Meeting

    Broader source: Energy.gov [DOE]

    Reno, Nevada The 2015 Geothermal Resources Council (GRC) Annual Meeting and the Geothermal Energy Association (GEA) Geothermal Energy Expo will be held in Reno, Nevada, on September 20–23. As the world’s largest annual geothermal conference and expo, this year’s event will bring together leaders in the geothermal industry; showcase the latest in geothermal research, exploration, development, and utilization; and feature workshops on important industry topics and field trips to nearby geothermal sites. Register today to reserve your spot.

  15. OHA 2014 ANNUAL REPORT DRAFT....

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hearings & Appeals Annual Report FY 2015 DOE/HG-0027 U.S. Department of Energy i 2015 Annual Report Office of Hearings and Appeals TABLE OF CONTENTS MESSAGE FROM THE DIRECTOR 1 INTRODUCTION 2 OVERVIEW OF FY 2015 CASE PROCESSING 3 AREAS OF JURISDICTION 4 A. PERSONNEL SECURITY 4 B. WHISTLEBLOWER 8 C. ALTERNATIVE DISPUTE RESOLUTION 9 D. FREEDOM OF INFORMATION AND PRIVACY ACTS 11 E. EXCEPTIONS AND SPECIAL REDRESS 13 F. OTHER AREAS OF OHA JURISDICTION 15 1. Subpart V Refund Proceeding 15 2.

  16. USGS Annual Water Data Reports

    SciTech Connect (OSTI)

    2012-04-01

    Water resources data are published annually for use by engineers, scientists, managers, educators, and the general public. These archival products supplement direct access to current and historical water data provided by the National Water Information System (NWIS). Beginning with Water Year 2006, annual water data reports are available as individual electronic Site Data Sheets for the entire Nation for retrieval, download, and localized printing on demand. National distribution includes tabular and map interfaces for search, query, display and download of data. Data provided include extreme and mean discharge rates.

  17. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    this guide is to provide you, the Operations and Maintenance (O&M)Energy manager and practitioner, with useful information about O&M management, technologies, energy and water ...

  18. National Geothermal Data System Architecture Design, Testing and Maintenance

    Broader source: Energy.gov [DOE]

    Project objective: To create the National Geothermal Data System (NGDS) comprised of a core and distributed network of databases and data sites that will comprise a federated system for acquisition, management, maintenance, and dissemination of geothermal and related data.

  19. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Allocating operations and maintenance (O&M) and repair and replacement (R&R) responsibilities Putting in place O&M reporting requirements. The goal is to minimize disagreements ...

  20. John William (Bill) Ebert Jr. ? Longtime Y-12 Maintenance Manager

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    John William (Bill) Ebert Jr. - Longtime Y-12 Maintenance Manager I knew him as "Mr. Ebert" when his office was in Building 9734. I used to park my bicycle in the hallway just...