Sample records for annual maintenance bolts

  1. STANDARD OPERATING PROCEDURES Annual Site Maintenance

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

  2. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25T23:59:59.000Z

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  3. Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th

    E-Print Network [OSTI]

    Firestone, Jeremy

    Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th at 12:00pm (Noon), the Central Utility Plant (CUP), which supplies steam service to over 100 buildings on the Newark campus, will be shut down for the annual Steam System Maintenance Outage. This effort is necessary each year to ensure

  4. Bolt failure detection

    DOE Patents [OSTI]

    Sutton, Jr., Harry G. (Pittsburgh, PA)

    1984-01-01T23:59:59.000Z

    Bolts of a liquid metal fast breeder reactor, each bolt provided with an internal chamber filled with a specific, unique radioactive tag gas. Detection of the tag gas is indicative of a crack in an identifiable bolt.

  5. Roof bolting improvements

    SciTech Connect (OSTI)

    Fiscor, S.

    2008-11-15T23:59:59.000Z

    Suppliers partner with mine operators to offer safer, more productive tools for roof bolting. 4 figs.

  6. Thrust bolting: roof bolt support apparatus

    DOE Patents [OSTI]

    Tadolini, Stephen C. (Lakewood, CO); Dolinar, Dennis R. (Golden, CO)

    1992-01-01T23:59:59.000Z

    A method of installing a tensioned roof bolt in a borehole of a rock formation without the aid of a mechanical anchoring device or threaded tensioning threads by applying thrust to the bolt (19) as the bonding material (7') is curing to compress the strata (3) surrounding the borehole (1), and then relieving the thrust when the bonding material (7') has cured.

  7. UVM Central Heating & Cooling Plant Annual Maintenance Shutdown 2013 Affected Buildings

    E-Print Network [OSTI]

    Hayden, Nancy J.

    UVM Central Heating & Cooling Plant Annual Maintenance Shutdown 2013 Affected Buildings Sunday 19 heating, hot water and critical air conditioning > NO CAGE WASHING > NO AUTOCLAVES > Given Boiler Plant will be in operation to provide heating, hot water and critical air conditioning > NO CAGE WASHING > NO AUTOCLAVES

  8. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    SciTech Connect (OSTI)

    Kalispel Tribe, Department of Natural Resources

    1998-01-01T23:59:59.000Z

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  9. The nuts and bolts of The nuts and bolts of

    E-Print Network [OSTI]

    Manolescu, Ioana

    of The nuts and bolts of The nuts and bolts of The nuts and bolts of The nuts and bolts of DBMS construction: DBMS construction: DBMS construction: DBMS construction: DBMS construction: DBMS construction: DBMS construction: DBMS construction: building your own prototype building your own prototype building your own

  10. Roof bolting equipment & technology

    SciTech Connect (OSTI)

    Fiscor, S.

    2009-04-15T23:59:59.000Z

    Technology provides an evaluator path to improvement for roof bolting machines. Bucyrus offers three different roof bolts models for various mining conditions. The LRB-15 AR is a single-arm boiler recommended for ranges of 32 inches and above; the dual-arm RB2-52A for ranges of 42 inches and above; and the dual-arm RB2-88A for ranges of 54 inches and above. Design features are discussed in the article. Developments in roof bolting technology by Joy Mining Machinery are reported. 4 photos.

  11. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect (OSTI)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01T23:59:59.000Z

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  12. Measuring mine roof bolt strains

    DOE Patents [OSTI]

    Steblay, Bernard J. (Lakewood, CO)

    1986-01-01T23:59:59.000Z

    A mine roof bolt and a method of measuring the strain in mine roof bolts of this type are disclosed. According to the method, a flat portion on the head of the mine roof bolt is first machined. Next, a hole is drilled radially through the bolt at a predetermined distance from the bolt head. After installation of the mine roof bolt and loading, the strain of the mine roof bolt is measured by generating an ultrasonic pulse at the flat portion. The time of travel of the ultrasonic pulse reflected from the hole is measured. This time of travel is a function of the distance from the flat portion to the hole and increases as the bolt is loaded. Consequently, the time measurement is correlated to the strain in the bolt. Compensation for various factors affecting the travel time are also provided.

  13. Second Annual Maintenance, Inspection, and Test Report for PAS-1 Cask Certification for Shipping Payload B

    SciTech Connect (OSTI)

    KELLY, D.J.

    2000-10-09T23:59:59.000Z

    The Nuclear Packaging, Inc. (NuPac), PAS-1 cask is required to undergo annual maintenance and inspections to retain certification in accordance with U.S. Department of Energy (DOE) Certificate of Compliance USA/9184B(U) (Appendix A). The packaging configuration being tested and maintained is the NuPac PAS-1 cask for Payload B. The intent of the maintenance and inspections is to ensure the packaging remains in unimpaired physical condition. Two casks, serial numbers 2162-026 and 2162-027, were maintained, inspected, and tested at the 306E Development, Fabrication, and Test Laboratory, located at the Hanford Site's 300 Area. Waste Management Federal Services, Inc. (WMFS), a subsidiary of GTS Duratek, was in charge of the maintenance and testing. Cogema Engineering Corporation (Cogema) directed the operations in the test facility. The maintenance, testing, and inspections were conducted successfully with both PAS-1 casks. The work conducted on the overpacks included weighing, gasket replacement, and plastic pipe plug and foam inspections. The work conducted on the secondary containment vessel (SCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, and a helium leak test. The work conducted on the primary containment vessel (PCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, dimensional inspection of the vessel bottom, a helium leak test, and dye penetrant inspection of the welds. The vermiculite material used in the cask rack assembly was replaced.

  14. Nickel alloy stud bolts failure: A case history

    SciTech Connect (OSTI)

    Toffolo, G.; Fassina, P.; Marangoni, M. [AGIP SpA, Milan (Italy); Msallem, A. [AGIP Oil, Tripoli (Libyan Arab Jamahiriya)

    1996-12-01T23:59:59.000Z

    High strength and corrosion resistance material as Inconel X-750 has been selected for the seal flange bolts in an off-shore field in Libya, due to its properties at high temperature, needed for compliance with Fire Safe requirements. After 4 years from the production start-up, during a routine maintenance of wellheads, some bolts have been found cracked. The paper deals with all the activities done in order to understand the cause of the failure. In particular failure analysis has been carried out through laboratory investigation, and shop tests have been conducted to confirm the field procedure and determine the tension on the bolts during the installation. The main conclusion was that the bolts failed due to the concurrence of stress (over-torque that means stress level higher than yield one) and corrosion (pit/crevice conditions). This environmentally assisted failure is known as Hydrogen Embrittlement (HE). Test carried out using the same X-mas tree mounted on the platform justifies the assumption that in the field, where the conditions are far from the ideal, it is possible that even when a uniform torque is set, the tensile stress applied to the bolts is not uniform, making the situation critical. From the corrosion side, the failed bolts showed some corrosion points near the cracks, as due to environment in the crevice/pitting conditions required to justify the hydrogen presence (the bolts are not cathodically protected). Fatigue has been demonstrated not to be responsible for the failure. Solutions are recommended which can safely be adopted during the installation and the substitution of bolts on an existing wellhead, which is operative under pressure without shutting in the well, and not impairing the safety operating envelope.

  15. Nitrous Oxide Systems Maintenance in Clinical Areas

    E-Print Network [OSTI]

    Jia, Songtao

    . It specifically speaks to maintenance of nitrous oxide delivery systems, preventive maintenance for house. Arrange with Facilities for regular preventive maintenance and annual performance check of ventilation). b. Provides preventive maintenance on ventilation system as necessary. c. Coordinates annual

  16. Detecting and escaping infinite loops using Bolt

    E-Print Network [OSTI]

    Kling, Michael (Michael W.)

    2012-01-01T23:59:59.000Z

    In this thesis we present Bolt, a novel system for escaping infinite loops. If a user suspects that an executing program is stuck in an infinite loop, the user can use the Bolt user interface, which attaches to the running ...

  17. NATIONAL CENTRE FOR BIOLOGICAL SCIENCES Annual Maintenance Contract for Electrical Systems in

    E-Print Network [OSTI]

    Udgaonkar, Jayant B.

    Maintenance Contract for Electrical systems including substations in Mandara hostel-CB site, NCBS : Rs.47,729.00 4. COST OF TENDER DOCUMENT : Rs. 500/- 5. SALE PERIOD : 13/12/2013 TO 23/12/2013 6. TIME:________________DATE:____________ __________________________________ FOR A SUM OF RS. ________________ TOWARDS __________________________________THE COST OF TENDER DOCUMENT

  18. Annual summary report on the surveillance and maintenance activities for the Oak Rige National Laboratory Environmental Restoration Program for fiscal year 1995

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    This Annual Summary Report on the Surveillance and Maintenance Activities for the Oak Ridge National Laboratory Environmental Restoration Program for Fiscal Year 1995 was prepared to communicate the accomplishments of the Program during fiscal year 1995. This work was performed under work breakdown structure element 1.4.12.6.1.14.20 (activity data sheet 3314, ``Remedial Action Surveillance and Maintenance``). Publication of this document meets the Life Cycle Baseline milestone date of November 30, 1995. This document provides the accomplishments for both the Remedial Action and Decontamination and Decommissioning Surveillance and Maintenance programs.

  19. Tightening procedures for large diameter anchor bolts 

    E-Print Network [OSTI]

    Abraham, Ryan Charles

    1997-01-01T23:59:59.000Z

    . Static Test Results. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3. 2. 1 Selection of Test Load. 3. 2. 2 Pole to Baseplate Welds. 3. 2. 3 Effect of Preload on Bolt... Stresses Induced by Column Base Moment. . Fatigue Test Results. . 3. 3. 1 4 I/2 UNC Threaded Bolts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3. 3. 2 8 UN Threaded Bolts. . 3. 3. 3 Fatigue of Pole to Baseplate Weld...

  20. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11T23:59:59.000Z

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality (specifically dissolved oxygen and temperature) is the main limiting factor in our fisheries.

  1. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11T23:59:59.000Z

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  2. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 2000 Annual Report.

    SciTech Connect (OSTI)

    Bluff, Stanley

    2000-12-01T23:59:59.000Z

    No Annual Production Goals were achieved for the year. The Kalispel Hatchery experienced two episodes of brood fish mortality. The first due to a standpipe malfunction and the second attributed to gas bubble disease caused by elevated Total Dissolved Gases (TDG's) in the reservoir. To date, the hatchery has 29 brood fish in the raceway and ready to spawn. If all things go well this spring, hatchery operations should be well underway next year.

  3. Stress analysis of closure bolts for shipping casks

    SciTech Connect (OSTI)

    Mok, G.C.; Fischer, L.E. (Lawrence Livermore National Lab., CA (United States)); Hsu, S.T. (Kaiser Engineers, Oakland, CA (United States))

    1993-01-01T23:59:59.000Z

    This report specifies the requirements and criteria for stress analysis of closure bolts for shipping casks containing nuclear spent fuels or high level radioactive materials. The specification is based on existing information conceming the structural behavior, analysis, and design of bolted joints. The approach taken was to extend the ASME Boiler and Pressure Vessel Code requirements and criteria for bolting analysis of nuclear piping and pressure vessels to include the appropriate design and load characteristics of the shipping cask. The characteristics considered are large, flat, closure lids with metal-to-metal contact within the bolted joint; significant temperature and impact loads; and possible prying and bending effects. Specific formulas and procedures developed apply to the bolt stress analysis of a circular, flat, bolted closure. The report also includes critical load cases and desirable design practices for the bolted closure, an in-depth review of the structural behavior of bolted joints, and a comprehensive bibliography of current information on bolted joints.

  4. A remote telepresence robotic system for inspection and maintenance of a nuclear power plant. Annual research status report

    SciTech Connect (OSTI)

    Crane, C.D. III; Tulenko, J.S.

    1993-02-01T23:59:59.000Z

    Progress in reported in the areas of environmental hardening; database/world modeling; man-machine interface; development of the Advanced Liquid Metal Reactor (ALMR) maintenance inspection robot design; and Articulated Transporter/Manipulator System (ATMS) development.

  5. Nuts and BoltsNuts and Bolts Clean Energy Muni Finance

    E-Print Network [OSTI]

    Kammen, Daniel M.

    Nuts and BoltsNuts and Bolts Clean Energy Muni Finance UC Berkeley Renewable and Appropriate Energy Financing · Financing cost administered through property taxg g bill · Little or no upfront cost to property Financing Options Special AssessmentsSpecial Assessments · Allow public improvements to be financed

  6. Documentation for first annual testing and inspections of Benificial Uses Shipping System (BUSS) Cask

    SciTech Connect (OSTI)

    Lundeen, J.E.

    1994-08-23T23:59:59.000Z

    The purpose of this report is to compile date generated during the first annual tests and inspections of the Benificiai Uses Shipping System (BUSS) Cask. In addition, this report will verify that the testing criteria identified in chapter 8 of the BUSS Cask Safety Analysis Report for Packaging (SARP) was met. Section 8.2 ``Maintenance and Periodic Inspection Program`` of the BUSS Cask SARP requires that the following tests and inspections be performed on an annual basis: Hydrostatic pressure test; helium leak test; dye penetrant test on the trunnions and lifting lugs; and torque test on all bolts; impact limiter inspection and weight test. The first annual inspections and testing of the BUSS Cask were completed on May 5, 1994, and met the SARP criteria.

  7. Areas of contact and pressure distribution in bolted joints

    E-Print Network [OSTI]

    Gould, Herbert Hirsch

    1970-01-01T23:59:59.000Z

    When two plates are bolted (or riveted) together these will be in contact in the immediate vicinity of the bolt heads and separated beyond it. The pressure distribution and size of the contact zone is of considerable ...

  8. A (Running) Bolt for New Reasons

    E-Print Network [OSTI]

    Iosif Bena; Stefano Giusto; Clement Ruef; Nicholas P. Warner

    2009-12-15T23:59:59.000Z

    We construct a four-parameter family of smooth, horizonless, stationary solutions of ungauged five-dimensional supergravity by using the four-dimensional Euclidean Schwarzschild metric as a base space and "magnetizing" its bolt. We then generalize this to a five-parameter family based upon the Euclidean Kerr-Taub-Bolt. These "running Bolt" solutions are necessarily non-static. They also have the same charges and mass as a non-extremal black hole with a classically-large horizon area. Moreover, in a certain regime their mass can decrease as their charges increase. The existence of these solutions supports the idea that the singularities of non-extremal black holes are resolved by low-mass modes that correct the singularity of the classical black hole solution on large (horizon-sized) scales.

  9. Annual report on surveillance and maintenance activities at Oak Ridge National Laboratory, Oak Ridge, Tennessee, fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1996-11-01T23:59:59.000Z

    In fiscal year (FY) 1995, the sites and facilities from both the Remedial Action (RA) and Decontamination and Decommissioning (D and D) programs were combined to form the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program. Surveillance and Maintenance activities were conducted throughout FY 1996 at the RA facilities. Overall, the RA S and M Program consists of approximately 650 acres that include 14 waste area groupings with approximately 200 sites. These sites include 46 major facilities, several leak and contaminated soil sites, 38 inactive tanks, approximately 50 environmental study areas and approximately 2,973 wells and boreholes. Site inspections were conducted at established frequencies on appropriate sites in the RA S and M Program in accordance with the established S and M FY 1996 Incentive Task Order (ITO).

  10. FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-11-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments.

  11. An experimental investigation of eccentrically loaded riveted and bolted connections

    E-Print Network [OSTI]

    Elias, Samy E. G

    1958-01-01T23:59:59.000Z

    Of CO1'if"tCCC fOA At*Id j f p f' 0 tt3w~ !%1Cfk1 f)C 13 TEST PROCEDURE 1. Determine basic rivet shear strength. 2. Rivet the plate to the angle. 3. Bolt the plate to the loading arm, 4. Bolt the angle td the jig. 5. Bolt the jig to the machine...

  12. An experimental investigation of eccentrically loaded riveted and bolted connections 

    E-Print Network [OSTI]

    Elias, Samy E. G

    1958-01-01T23:59:59.000Z

    Of CO1'if"tCCC fOA At*Id j f p f' 0 tt3w~ !%1Cfk1 f)C 13 TEST PROCEDURE 1. Determine basic rivet shear strength. 2. Rivet the plate to the angle. 3. Bolt the plate to the loading arm, 4. Bolt the angle td the jig. 5. Bolt the jig to the machine...

  13. Maintenance Types

    Broader source: Energy.gov [DOE]

    Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

  14. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A. [comp.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01T23:59:59.000Z

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  15. AH Bolte A S | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1 WindtheEnergySulfonate asAEEOpenOpen EnergyAGL EnergyAH Bolte

  16. Reactive Maintenance

    Broader source: Energy.gov [DOE]

    Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

  17. Inspection & Maintenance

    E-Print Network [OSTI]

    vehicles they own or control: 1. Preventative maintenance/safety inspections at least every 3 to 6 months provides a Preventive Maintenance Check List for guidance and scheduling. 2. If a vehicle is under warranty, Fleet Services will ensure the vehicle has at least the normal preventative, scheduled maintenance

  18. Repairs for damaged bolt holes in continuous fiber reinforced plastics 

    E-Print Network [OSTI]

    Copps, Kevin Daniel

    1992-01-01T23:59:59.000Z

    repair method for damaged bolt holes in such composites. Bolt holes in three types of graphite-epoxy were purposely damaged and then repaired. Each was tested to characterize its static and fatigue behavior. The tests used a special fixture to simulate... composite joints . Bearing-bypass ratio can change the failure mode of bolted composite joints 7 Drilling defects in graphite-epoxy coupons 12 26 The exit side of a IM7/8551-7A 18 ply tape coupon showing the damage due to drilling 27 9 Resin filled...

  19. Turn-of-the-nut tightening of anchor bolts

    E-Print Network [OSTI]

    Richards, Jason Halbert

    2004-09-30T23:59:59.000Z

    Double-nut anchor bolt systems are used in the erection of traffic signal poles, high-mast luminaries, and other highway appurtenances. An absence of a tightening standard for such systems decreases the confidence in their performance under fatigue...

  20. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations and Maintenance Operations OASIS: OATI (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) Contact Information...

  1. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

  2. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Resources Contact Information Transmission Planning Western OATT Revision Maintenance Data Outage Coordination Request (Doc - 21K) Right of Way - Vegetation Management...

  3. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2003-04-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. More field tests have been performed. A trendline analysis method has been developed. This method would improve the accuracy in detecting the locations of fractures and in determining the rock strength.

  4. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2002-10-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. Additional field tests have been performed in this quarter. The development of the data interpretation methodology and other related tasks are still continuing.

  5. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2003-01-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. Additional field tests have been performed. It is found that the drilling power can be used as a supplementary method for detecting voids/fractures and rock interfaces.

  6. Predictive Maintenance

    Broader source: Energy.gov [DOE]

    Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

  7. Preventive Maintenance

    Broader source: Energy.gov [DOE]

    Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

  8. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1993. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-11-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D&D) Program has continued to provide surveillance and maintenance (S&M) support for 34 surplus facilities. The objectives are to (1) ensure adequate containment of residual radioactive materials remaining in the facilities, (2) provide safety and security controls to minimize the potential hazards to on-site personnel and the general public, and (3) manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S&M planning, (2) routine S&M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  9. Annual summary report on the surveillance and maintenence plan for Waste Area Groupings at Oak Ridge National Laboratory for period ending September 30, 1992

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.; Jones, R.G.

    1992-11-01T23:59:59.000Z

    Surveillance and maintenance (S M) of 75 sites was conducted by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals at Oak Ridge National Laboratory. S M activities on these facilities and sites was started at the end of their operating life and will continue until final facility disposal or site stabilization. The objectives of the Waste Area Grouping S M Program are met by maintaining a program of routine S M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program's activities and includes tables indicating tank levels and dry well data for FY 1992.

  10. Annual summary report on the surveillance and maintenence plan for Waste Area Groupings at Oak Ridge National Laboratory for period ending September 30, 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.; Jones, R.G.

    1992-11-01T23:59:59.000Z

    Surveillance and maintenance (S&M) of 75 sites was conducted by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals at Oak Ridge National Laboratory. S&M activities on these facilities and sites was started at the end of their operating life and will continue until final facility disposal or site stabilization. The objectives of the Waste Area Grouping S&M Program are met by maintaining a program of routine S&M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program`s activities and includes tables indicating tank levels and dry well data for FY 1992.

  11. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D&D) Program is part of the Department of Energy (DOE) Environmental Restoration D&D Program and has continued to provide surveillance and maintenance (S&M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S&M planning, (2) routine S&M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  12. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D D) Program is part of the Department of Energy (DOE) Environmental Restoration D D Program and has continued to provide surveillance and maintenance (S M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S M planning, (2) routine S M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  13. Reliability-Centered Maintenance

    Broader source: Energy.gov [DOE]

    Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

  14. Evaluation of Roof Bolting Requirements Based on In-Mine Roof Bolter Drilling

    SciTech Connect (OSTI)

    Syd S. Peng

    2005-10-01T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on this information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. For the prediction of roof geology and stability condition in real time, a micro processor was used and a program developed to monitor and record the drilling parameters of roof bolter. These parameters include feed pressure, feed flow (penetration rate), rotation pressure, rotation rate, vacuum pressure, oil temperature of hydraulic circuit, and signals for controlling machine. From the results of a series of laboratory and underground tests so far, feed pressure is found to be a good indicator for identifying the voids/fractures and estimating the roof rock strength. The method for determining quantitatively the location and the size of void/fracture and estimating the roof rock strength from the drilling parameters of roof bolter was developed. Also, a set of computational rules has been developed for in-mine roof using measured roof drilling parameters and implemented in MRGIS (Mine Roof Geology Information System), a software package developed to allow mine engineers to make use of the large amount of roof drilling parameters for predicting roof geology properties automatically. For the development of roof bolting criteria, finite element models were developed for tensioned and fully grouted bolting designs. Numerical simulations were performed to investigate the mechanisms of modern roof bolting systems including both the tension and fully grouted bolts. Parameters to be studied are: bolt length, bolt spacing, bolt size/strength, grout annulus, in-situ stress condition, overburden depth, and roof geology (massive strata, fractured, and laminated or thinly-bedded). Based on the analysis of the mechanisms of both bolting systems and failure modes of the bolted strata, roof bolting design criteria and programs for modern roof bolting systems were developed. These criterion and/or programs were combined with the MRGIS for use in conjunction with roof bolt installation.

  15. Majorana Demonstrator Bolted Joint Mechanical and Thermal Analysis

    SciTech Connect (OSTI)

    Aguayo Navarrete, Estanislao; Reid, Douglas J.; Fast, James E.

    2012-06-01T23:59:59.000Z

    The MAJORANA DEMONSTRATOR is designed to probe for neutrinoless double-beta decay, an extremely rare process with a half-life in the order of 1026 years. The experiment uses an ultra-low background, high-purity germanium detector array. The germanium crystals are both the source and the detector in this experiment. Operating these crystals as ionizing radiation detectors requires having them under cryogenic conditions (below 90 K). A liquid nitrogen thermosyphon is used to extract the heat from the detectors. The detector channels are arranged in strings and thermally coupled to the thermosyphon through a cold plate. The cold plate is joined to the thermosyphon by a bolted joint. This circular plate is housed inside the cryostat can. This document provides a detailed study of the bolted joint that connects the cold plate and the thermosyphon. An analysis of the mechanical and thermal properties of this bolted joint is presented. The force applied to the joint is derived from the torque applied to each one of the six bolts that form the joint. The thermal conductivity of the joint is measured as a function of applied force. The required heat conductivity for a successful experiment is the combination of the thermal conductivity of the detector string and this joint. The thermal behavior of the joint is experimentally implemented and analyzed in this study.

  16. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan (0 Comments) The Genepool cluster will be offline for maintenance next Tuesday,...

  17. Development of a new roof bolt technology to improve gate-road performance

    SciTech Connect (OSTI)

    Caggiano, V.; Rauch, G.; Beck, K.-D.; Chen, J. [Hilti, Inc. (United States)

    2005-10-01T23:59:59.000Z

    Hilti has developed, in conjunction with Foundation Coal, a self-drilling bolt that cuts roof bolting times. The system uses a wet, self-drilling, hollow bolt technology with a self-contained resin cartridge. The resin is dispensed using an injection adapter that provides the high pressure water needed to dispense the resin. The OneStep roof bolt contains an axially shifting mixer that ensures the resin is properly mixed as it exits the water ports near the end of the bolt near the drill head. This eliminates the opportunity for plastic materials to interface between the strata and the bolt. In 2004 the OneStep Bolt was successfully installed in DSK's Prosper Haniel Colliery in Germany, achieving a 42% reduction in single-boom roof bolt cycle time and a 36% reduction in twin-boom roof bolt cycle time. Foundation Coal will be installing 2000 6 ft active bolts in one of the North Appalachian longwall locations. 1 fig.

  18. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2001-07-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. In this quarter, retrofitting work to build a dedicated roof bolter for this research has been started. A number of numerical methods have been developed to improve the quality of and to analyze the collected drilling parameters. Finite element modeling of roof bolting mechanism is continuing.

  19. Documentation for fiscal year 1995 annual BUSS cask SARP testing and inspections

    SciTech Connect (OSTI)

    Saueressig, P.T.

    1994-11-08T23:59:59.000Z

    The purpose of this report is to compile the data generated during the Fiscal Year (FY) 1995 annual tests and inspections performed on the Beneficial Uses Shipping System (BUSS) cask. The BUSS Cask Model R-1 is a type B shipping container used for shipment of radioactive cesium-137 and strontium-90 capsules to Waste Encapsulation and Storage Facility (WESF). The primary purpose of the BUSS Cask is to provide shielding and confinement as well as impact, puncture, and thermal protection for the capsules under both normal and accident conditions. Section 8.2 ``Maintenance and Periodic Inspection Program`` of the BUSS Cask SARP requires that the following tests and inspections be performed on an annual basis: hydrostatic pressure test; helium leak test; dye penetrant test on the trunnions and life lugs; torque test on all permanent bolts; and impact limiter inspection and weight test. In addition to compiling the generated data, this report will verify that the testing criteria identified in section 8.2 of the BUSS Cask Safety Analysis Report for Packaging (SARP) was met.

  20. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2002-01-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. A new mechanical approach to estimate rock strengths using the acquired drilling parameters has been proposed. This approach takes a number of important factors, that have never been studied in the previous researches, into the considerations. Good results have been shown using the new approach on the testing data.

  1. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2001-10-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. The retrofitting works for a dedicated roof bolter for this research has been completed. The laboratory tests performed using this machine on simulated roof blocks have been conducted. The analysis performed on the testing data showed promising signs to detect the rock interface, fractures, as well as the rock types. The other tasks were progressing as planned.

  2. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2002-07-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. Field tests have been performed in two underground coal mines in this quarter. It also found from the tests that the non-drilling thrust and torque should be deducted from the acquired drilling data. The non-drilling torque is actually higher than that is used to overcome the shear strength is proportional to the rotation rate.

  3. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2002-04-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. More laboratory tests have been performed in this quarter. The analysis performed on the testing data showed: (1) abnormal rotational accelerations can be used as the indicator of the rock interfaces, and (2) the sharp drops of drilling thrust and torque agree well with the locations of fractures.

  4. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2003-07-15T23:59:59.000Z

    Roof bolting is the most popular method for underground openings in the mining industry, especially in the bedded deposits such as coal, potash, salt etc. In fact, all U.S. underground coal mine entries are roof-bolted as required by law. However, roof falls still occur frequently in the roof bolted entries. The two possible reasons are: the lack of knowledge of and technology to detect the roof geological conditions in advance of mining, and lack of roof bolting design criteria for modern roof bolting systems. This research is to develop a method for predicting the roof geology and stability condition in real time during roof bolting operation. Based on such information, roof bolting design criteria for modern roof bolting systems will be developed for implementation in real time. In this quarter, the field, theoretical and programming works have been performed toward achieving the research goals set in the proposal. The selected site and the field testing plan enabled us to test all three aspects of roof geological features. The development of the data interpretation methodologies and the geology mapping computer program have also been preceding well.

  5. EVALUATION OF TROQUE VS CLOSURE BOLT PRELOAD FOR A TYPICAL CONTAINMENT VESSEL UNDER SERVICE CONDITIONS

    SciTech Connect (OSTI)

    Smith, A.

    2010-02-16T23:59:59.000Z

    Radioactive material package containment vessels typically employ bolted closures of various configurations. Closure bolts must retain the lid of a package and must maintain required seal loads, while subjected to internal pressure, impact loads and vibration. The need for insuring that the specified preload is achieved in closure bolts for radioactive materials packagings has been a continual subject of concern for both designers and regulatory reviewers. The extensive literature on threaded fasteners provides sound guidance on design and torque specification for closure bolts. The literature also shows the uncertainty associated with use of torque to establish preload is typically between 10 and 35%. These studies have been performed under controlled, laboratory conditions. The ability to insure required preload in normal service is, consequently, an important question. The study described here investigated the relationship between indicated torque and resulting bolt load for a typical radioactive materials package closure using methods available under normal service conditions.

  6. Repairs for damaged bolt holes in continuous fiber reinforced plastics

    E-Print Network [OSTI]

    Copps, Kevin Daniel

    1992-01-01T23:59:59.000Z

    ANALYSIS Model Definition Analysis Results Comparing Lay-ups Pin-conditions vs. clamping pressure Stress interactions Repair material CONCLUSIONS REFERENCES APPENDIX VITA 21 22 23 24 25 25 25 26 27 27 28 29 30 30 31 33 33 34 34... under pin conditions . 35 16 A modification was made to the test fixture to relieve the high cyclic stresses on the bolt 37 vu 17 When clamping pressure is applied, a normally drilled, unrepaired, fastener hole is stronger and tends to fail in net...

  7. Heating and cooling gas-gun targets: nuts and bolts

    SciTech Connect (OSTI)

    Gustavsen, Richard L [Los Alamos National Laboratory; Bartram, Brian D [Los Alamos National Laboratory; Gehr, Russell J [HONEYWEL FM& T; Bucholtz, Scott M [HINEYWELL FM& T

    2009-01-01T23:59:59.000Z

    The nuts and bolts of a system used to heat and cool gas-gun targets is described. We have now used the system for more than 35 experiments, all of which have used electromagnetic gauging. Features of the system include a cover which is removed (remotely) just prior to projectile impact and the widespread use of metal/polymer insulations. Both the cover and insulation were required to obtain uniform temperatures in samples with low thermal conductivity. The use of inexpensive video cameras to make remote observations of the cover removal was found to be very useful. A brief catalog of useful glue, adhesive tape, insulation, and seal materials is given.

  8. Field Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Maintenance, (J5100) Wyoming/Nebraska Maintenance Office...

  9. 12th Annual Minnesota Pavement

    E-Print Network [OSTI]

    Minnesota, University of

    12th Annual Minnesota Pavement Conference: Session Summaries Conference Sponsors: Minnesota Research Alliance (TERRA) Pavement Research Institute (PRI) Hosted by: Center for Transportation Studies provides information to practitioners and others in pavement design, construction, and maintenance

  10. Job Maintenance and Capital Development Fund (North Carolina)

    Broader source: Energy.gov [DOE]

    The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of...

  11. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    SciTech Connect (OSTI)

    Fisk, E.L.

    1994-06-01T23:59:59.000Z

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  12. Associate Vice Chancellor Maintenance

    E-Print Network [OSTI]

    Hartman, Chris

    Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract

  13. Predictive Maintenance Technologies

    Broader source: Energy.gov [DOE]

    Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

  14. The significance of bolts in the thermal performance of curtain-wall frames for glazed facades

    SciTech Connect (OSTI)

    Griffith, B.; Finlayson, E.; Yazdanian, M.; Arasteh, D.K. [Lawrence Berkeley National Lab., CA (United States)

    1998-10-01T23:59:59.000Z

    Curtain walls are assemblies of glazings and metal frames that commonly form the exterior glass facades of commercial buildings. Evaluating the thermal performance of the bolts that hold curtain wall glazings in place is necessary to accurately rate the overall thermal performance of curtain walls. Using laboratory tests and computer simulations, the authors assessed the thermal performance of several different configurations of bolts and glazings. Curtain-wall samples were tested at an infrared thermography laboratory. Experimental results were compared to two-dimensional simulations approximating the thermal effect of the bolts using the parallel path and the isothermal planes calculation methods. It is concluded that stainless steel bolts minimally affect curtain-wall thermal performance ({approximately}18%) when spaced at least 230 mm apart, which is the industry standard. Performance is increasingly compromised when there is less than 230 mm between bolts or when steel bolts are used. The authors also show that the isothermal planes method of approximating curtain wall thermal performance can be used with two-dimensional heat transfer software typical of that used in the window industry to give conservative results for the thermal bridging effect caused by bolts.

  15. Prevention of crevice corrosion in duplex SS flanges using carbon steel bolts with cathodic protection

    SciTech Connect (OSTI)

    Thomason, W.H.; Ivie, R.G.; Marlow, J.A.

    1999-07-01T23:59:59.000Z

    Achieving reliable long-term performance of high strength bolts for flange connections in subsea service is a critical issue for the offshore industry. Viable bolting materials with high strength that are not susceptible to embrittlement or galvanic corrosion when the flanges are made of stainless steels are limited. A laboratory study was performed to determine the viability of using B7 carbon steel stud bolts and 316 stainless steel (SS) seal rings in a Duplex SS flange for subsea service The laboratory test system used full size commercial flanges, bolts and seal rings to simulate electrochemical conditions that will occur in crevices associated with carbon steel bolts in a Duplex SS flange and with the use of a 316 stainless steel seal ring in a Duplex SS flange. The flange systems were instrumented to enable monitoring of current densities and potentials at precise locations within the crevices throughout the tests as test parameters were changed. Test parameters included cathodic protection level, temperature, and sealing the outer flange gap. Cathodic protection was provided by remote aluminum sacrificial anodes to achieve potentials typical for a sub sea manifold. Both electrochemical data and examination of the components at the end of the 164 day exposure indicated that sufficient cathodic protection occurred in the crevices to provide long term corrosion control to all of the components involved. The capability to use B7 bolts rather than high alloy bolts enables a significant project savings.

  16. 05.01 1 Budget Maintenance and Development REGENTS' POLICY

    E-Print Network [OSTI]

    Pantaleone, Jim

    05.01 1 Budget Maintenance and Development REGENTS' POLICY PART V ­ FINANCE AND BUSINESS MANAGEMENT Chapter 05.01 - Budget Development and Maintenance P05.01.010. Budget Policy. A. The budget by their respective annually adopted budgets and approved amendments, in accordance with procedure established

  17. Mining Surveillance and Maintenance Dollars

    SciTech Connect (OSTI)

    MARTINEZ, R.

    2000-02-01T23:59:59.000Z

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

  18. Estimation of Highway Maintenance Marginal Cost under Multiple Maintenance Activities

    E-Print Network [OSTI]

    Anani, Shadi B.; Madanat, Samer M

    2010-01-01T23:59:59.000Z

    Marginal costs for road maintenance and operation - a cost2010-01) Estimation of Highway Maintenance Marginal Costunder Multiple Maintenance Activities Shadi B. Anani and

  19. Computerized Maintenance Management Systems

    Broader source: Energy.gov [DOE]

    Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

  20. Optimizing Preventive Maintenance Models

    E-Print Network [OSTI]

    Optimizing Preventive Maintenance Models. Michael Bartholomew-Biggs. School of Physics Astronomy and Mathematics, University of Hertfordshire.

  1. Nonrotating, self-centering anchor assembly for anchoring a bolt in a borehole

    DOE Patents [OSTI]

    Bevan, J.E.; King, G.W.

    1998-12-08T23:59:59.000Z

    An expandable anchor assembly is provided for anchoring the threaded end portion of an elongated roof bolt in a borehole. The anchoring assembly includes a hollow outer sleeve in the form of a plurality of symmetrically arranged, longitudinal segmented wall portions with exterior gripping teeth and an inner expander sleeve in the form of a corresponding plurality of longitudinal wall portions symmetrically arranged about a central axis to define an inner threaded cylindrical section. The inner sleeve is captured within and moveable axially relative to the outer sleeve. As the threaded end portion of the elongated bolt is inserted into the inner threaded cylindrical section of the inner sleeve from the trailing end to the leading end thereof, the inner sleeve expands over and clamps around the threaded end portion of the elongated bolt. Thereafter, partial withdrawal of the elongated bolt from the borehole causes the inner sleeve to axially move relative to the outer sleeve from the leading end toward the trailing end of the outer sleeve in a wedging action to cause the outer sleeve to radially expand and force engagement of the gripping teeth against the sidewall of the borehole to thereby secure the expandable anchor assembly and therewith the threaded end portion of the elongated bolt within the borehole. 8 figs.

  2. PIXE Analysis of Metal Hull Bolts From HMB DeBraak

    SciTech Connect (OSTI)

    Correll, Francis D.; Cole, Lord K.; Slater, Charles J.; Vanhoy, Jeffrey R. [Physics Department, United States Naval Academy, 572C Holloway Road, Annapolis, MD 21402 (United States); Fithian, Charles H. [Delaware Division of Historical and Cultural Affairs, 21 The Green, Dover DE 19901 (United States)

    2009-03-10T23:59:59.000Z

    HMB DeBraak was a 16-gun British brig-sloop that sank in a squall on May 25, 1798 off Cape Henlopen, Delaware. Silt covered the wooden hull shortly after it sank, preserving it until DeBraak was raised in 1986. The items recovered from the ship include metal bolts that held the hull together. We used PIXE to measure the compositions of 45 of the bolts and found that they are nearly pure copper (98.3% on average), with most also containing small amounts of iron (0.87%), nickel (0.039%), arsenic (0.43%), silver (0.089%), lead (0.18%), and bismuth (0.12%). A few contain a little indium, tin, or antimony, but none contain zinc above the quantization level. The compositions are similar to those reported for 18th-century English copper, but different from several copper alloys also used to make hull bolts. We conclude that, when DeBraak was last fitted out in 1795-1797, the Royal Navy was still using bolts similar to William Forbes's mechanically hardened pure copper bolts. Forbes's process represents the successful innovation and application of new technology in Royal Navy ships during the wars of the late 18th century.

  3. Nonrotating, self-centering anchor assembly for anchoring a bolt in a borehole

    DOE Patents [OSTI]

    Bevan, John E. (Spokane, WA); King, Grant W. (Spokane, WA)

    1998-01-01T23:59:59.000Z

    An expandable anchor assembly is provided for anchoring the threaded end portion of an elongated roof bolt in a borehole. The anchoring assembly includes a hollow outer sleeve in the form of a plurality of symmetrically arranged, longitudinal segmented wall portions with exterior gripping teeth and an inner expander sleeve in the form of a corresponding plurality of longitudinal wall portions symmetrically arranged about a central axis to define an inner threaded cylindrical section. The inner sleeve is captured within and moveable axially relative to the outer sleeve. As the threaded end portion of the elongated bolt is inserted into the inner threaded cylindrical section of the inner sleeve from the trailing end to the leading end thereof, the inner sleeve expands over and clamps around the threaded end portion of the elongated bolt. Thereafter, partial withdrawal of the elongated bolt from the borehole causes the inner sleeve to axially move relative to the outer sleeve from the leading end toward the trailing end of the outer sleeve in a wedging action to cause the outer sleeve to radially expand and force engagement of the gripping teeth against the sidewall of the borehole to thereby secure the expandable anchor assembly and therewith the threaded end portion of the elongated bolt within the borehole.

  4. Load apparatus and method for bolt-loaded compact tension test specimen

    DOE Patents [OSTI]

    Buescher, B.J. Jr.; Lloyd, W.R.; Ward, M.B.; Epstein, J.S.

    1997-02-04T23:59:59.000Z

    A bolt-loaded compact tension test specimen load apparatus includes: (a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; (b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; (c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and (d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen. 6 figs.

  5. Load apparatus and method for bolt-loaded compact tension test specimen

    DOE Patents [OSTI]

    Buescher, Jr., Brent J. (Idaho Falls, ID); Lloyd, W. Randolph (Idaho Falls, ID); Ward, Michael B. (Idaho Falls, ID); Epstein, Jonathan S. (Idaho Falls, ID)

    1997-01-01T23:59:59.000Z

    A bolt-loaded compact tension test specimen load apparatus includes: a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen.

  6. Operation and Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations and Maintenance Operations OASIS: WALC-DSW (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) Contact Information...

  7. Centralized maintenance procedures

    SciTech Connect (OSTI)

    Barber, J.R.

    1994-02-01T23:59:59.000Z

    In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

  8. HVAC Maintenance and Technologies

    Broader source: Energy.gov [DOE]

    Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

  9. 2001 annual report 2001 annual report

    E-Print Network [OSTI]

    New Mexico, University of

    2001 annual report 2001 annual report 2001 annual report 2001 annual report 2001 annual report 2001 annual report 2001 annual report 2001 annual reportelectrical & computer engineering 2001 annual report the university of new mexico department of 2001 annual report 2001 annual report 2001 annual report 2001 annual

  10. Wind energy, with an annual growth of about 30%, represents one of the fastest growing renewable energy sources. Continuous long-term monitoring of wind turbines can greatly reduce maintenance

    E-Print Network [OSTI]

    Stanford University

    Abstract Wind energy, with an annual growth of about 30%, represents one of the fastest growing Monitoring, Wind Turbines 1 Introduction Wind energy, considered to be safe, inexpensive and clean, is one of the fastest growing renewable energy resources (Bloomberg, 2011). According to the World Wind Energy

  11. Operations and Maintenance Program Structure

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

  12. STRUCTURAL ANALYSES OF FUEL CASKS SUBJECTED TO BOLT PRELOAD, INTERNAL PRESSURE AND SEQUENTIAL DYNAMIC IMPACTS

    SciTech Connect (OSTI)

    Wu, T

    2009-06-25T23:59:59.000Z

    Large fuel casks subjected to the combined loads of closure bolt tightening, internal pressure and sequential dynamic impacts present challenges when evaluating their performance in the Hypothetical Accident Conditions (HAC) specified in the Code of Federal Regulations Title 10 Part 71 (10CFR71). Testing is often limited by cost, difficulty in preparing test units and the limited availability of facilities which can carry out such tests. In the past, many casks were evaluated without testing by using simplified analytical methods. In addition, there are no realistic analyses of closure bolt stresses for HAC conditions reported in the open literature. This paper presents a numerical technique for analyzing the accumulated damages of a large fuel cask caused by the sequential loads of the closure bolt tightening and the internal pressure as well as the drop and crash dynamic loads. The bolt preload and the internal pressure are treated as quasi-static loads so that the finite element method with explicit numerical integration scheme based on the theory of wave propagation can be applied. The dynamic impacts with short durations such as the 30-foot drop and the 40-inch puncture for the hypothetical accident conditions specified in 10CFR71 are also analyzed by using the finite-element method with explicit numerical integration scheme.

  13. Maintenance and Operations of Schools for Energy Efficiency

    E-Print Network [OSTI]

    McClure, J. D.; Estes, J. M.

    1986-01-01T23:59:59.000Z

    Maintenance and operations of schools with energy efficiency as a priority can reduce annual utility costs 3 to 30 percent. Most school districts do not have an organized plan for tracking energy usage or cost. Energy performance (e.g. Btu/ft^2-yr...

  14. REST Web Service Maintenance Through API Policy Enforcement

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    1 REST Web Service Maintenance Through API Policy Enforcement Hiranya Jayathilaka, Chandra Krintz 100% annual growth rate [2]. These APIs increasingly employ the REST (Representational State Transfer accessible to users via web application programming interfaces (web APIs) and cloud-based deployment

  15. A formal ontology for industrial maintenance

    E-Print Network [OSTI]

    Boyer, Edmond

    strategies (preventive maintenance, predictive maintenance, corrective maintenance), to managing operators1 A formal ontology for industrial maintenance Authors: 1- Dr. Mohamed Hedi KARRAY, LGP The rapid advancement of information and communication technologies has resulted in a variety of maintenance

  16. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2001-04-15T23:59:59.000Z

    In this quarter, the research effort is to develop the drill control unit (DCU) that acquire, store drilling parameters and control the drilling operation. The relevant publications have been reviewed and the methodology developed by previous researchers has been evaluated using the collected data in our laboratory and field tests conducted prior to the start of this project. Numerical modeling for exploring roof bolting mechanism has been started.

  17. Operation and Maintenance

    E-Print Network [OSTI]

    van Hemmen, J. Leo

    in this Publication is provided as is and has been prepared solely for the purpose of evaluating data center designOperation and Maintenance InRow® RD Air Cooled ACRD100 ACRD101 #12;This manual is available assumes no liability for damages, violations of codes, improper installation, system failures, or any

  18. CH Packaging Maintenance Manual

    SciTech Connect (OSTI)

    Washington TRU Solutions

    2002-01-02T23:59:59.000Z

    This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

  19. Robust Maintenance Policies in Asset Management

    E-Print Network [OSTI]

    Kuhn, Kenneth D.; Madanat, Samer M.

    2005-01-01T23:59:59.000Z

    Madanat, S. , ‘Optimal Maintenance and Repair Policies inROBUST MAINTENANCE POLICIES IN ASSET MANAGEMENT Kenneth D.approach may reduce maintenance and rehabilitation (M&R)

  20. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier (0 Comments) There will be a major NERSC maintenance...

  1. Operations and Maintenance Best Practices Guide | Department...

    Broader source: Energy.gov (indexed) [DOE]

    of Maintenance Programs Chapter 6: Predictive Maintenance Technologies Chapter 7: Commissioning Existing Buildings Chapter 8: Metering for Operations and Maintenance Chapter 9:...

  2. Sustaining the National Geothermal Data System: Considerations for a System Wide Approach and Node Maintenance, Geothermal Resources Council 37th Annual Meeting, Las Vegas, Nevada, September 29-October 2, 2013

    SciTech Connect (OSTI)

    Allison, Lee [Arizona Geological Survey; Chickering, Cathy [Southern Methodist University; Anderson, Arlene [U. S. Department of Energy, Geothermal Technologies Office; Richard, Stephen M. [Arizona Geological Survey

    2013-10-01T23:59:59.000Z

    Since the 2009 American Recovery and Reinvestment Act the U.S. Department of Energy’s Geothermal Technologies Office has funded $33.7 million for multiple data digitization and aggregation projects focused on making vast amounts of geothermal relevant data available to industry for advancing geothermal exploration. These projects are collectively part of the National Geothermal Data System (NGDS), a distributed, networked system for maintaining, sharing, and accessing data in an effort to lower the levelized cost of electricity (LCOE). Determining “who owns” and “who maintains” the NGDS and its data nodes (repositories in the distributed system) is yet to be determined. However, the invest- ment in building and populating the NGDS has been substantial, both in terms of dollars and time; it is critical that this investment be protected by ensuring sustainability of the data, the software and systems, and the accessibility of the data. Only then, will the benefits be fully realized. To keep this operational system sustainable will require four core elements: continued serving of data and applications; maintenance of system operations; a governance structure; and an effective business model. Each of these presents a number of challenges. Data being added to the NGDS are not strictly geothermal but data considered relevant to geothermal exploration and develop- ment, including vast amounts of oil and gas and groundwater wells, among other data. These are relevant to a broader base of users. By diversifying the client base to other users and other fields, the cost of maintaining core infrastructure can be spread across an array of stakeholders and clients. It is presumed that NGDS will continue to provide free and open access to its data resources. The next-phase NGDS operation should be structured to eventually pursue revenue streams to help off-set sustainability expenses as necessary and appropriate, potentially including income from: grants and contracts (agencies, foundations, pri- vate sector), membership, fees for services (consulting, training, customization, ‘app’ development), repository services (data, services, apps, models, documents, multimedia), advertisements, fees for premier services or applications, subscriptions to value added services, licenses, contributions and donations, endow- ments, and sponsorships.

  3. Proposed SOLCOST maintenance activities

    SciTech Connect (OSTI)

    none,

    1980-01-01T23:59:59.000Z

    This document provides a short description of work that has been accomplished to date and work in progress. A discussion of the program status as it is currently configured follows and finally proposed work by Solar Environmental Engineering Company (SEEC) in its most recently signed contract with the Department of Energy (DOE) is given. Early statements are designed to give the reader a good background so that the suggested SOLCOST maintenance activities will be more easily understood.

  4. Regulatory analysis for the resolution of Generic Safety Issue 29: Bolting degradation or failure in nuclear power plants

    SciTech Connect (OSTI)

    Chang, T.Y.

    1991-09-01T23:59:59.000Z

    Generic Safety Issue (GSI)-29 deals with staff concerns about public risk due to degradation or failure of safety-related bolting in nuclear power plants. The issue was initiated in November 1982. Value-impact studies of a mandatory program on safety-related bolting for operating plants were inconclusive: therefore, additional regulatory requirements for operating plants could not be justified in accordance with provisions of 10 CFR 50.109. In addition, based on operating experience with bolting in both nuclear and conventional power plants, the actions already taken through bulletins, generic letters, and information notices, and the industry-proposed actions, the staff concluded that a sufficient technical basis exists for the resolution of GSI-29. The staff further concluded that leakage of bolted pressure joints is possible but catastrophic failure of a reactor coolant pressure boundary joint that will lead to significant accident sequences is highly unlikely. For future plants, it was concluded that a new Standard Review Plant section should be developed to codify existing bolting requirements and industry-developed initiatives. 9 refs., 1 tab.

  5. Scheduling with Fixed Maintenance, Shared Resources and ...

    E-Print Network [OSTI]

    2015-02-07T23:59:59.000Z

    Nov 17, 2014 ... maintenance constraints, blending and shared resources. ...... tegrated fixed time interval preventive maintenance and production for schedul-.

  6. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

  7. Scheduling Flexible Maintenance Activities subject to Job ...

    E-Print Network [OSTI]

    2010-04-14T23:59:59.000Z

    Apr 3, 2010 ... models by allowing a flexible maintenance schedule. Specifically, under restrictions determined by the respective setting, maintenance ...

  8. Lawn Maintenance Safety

    E-Print Network [OSTI]

    Smith, David

    2005-07-12T23:59:59.000Z

    debris and noise. ? Allow the engine to cool before returning it to a storage shed. ? Turn the power off and disconnect the spark plug wire before cleaning, inspecting, adjusting or repairing the cutting blade. Lawn Maintenance Safety ? Don?t run a... as possible to avoid being hit by passing vehicles. ? Never leave an electric- or gas-powered edger plugged in or running while unattended. ? Unplug or turn off an electric or gas-powered edger before inspecting, cleaning, adjusting or replacing the blade...

  9. Home Maintenance Manual.

    E-Print Network [OSTI]

    Anonymous,

    1985-01-01T23:59:59.000Z

    - erly and drains away from house. * * * ? Tighten loose mountings. * * * ? Spot-paint worn areas. Repair or caulk holes. Replace any sections that have holes or excessive rust. * * * b. Clean gutter strainers, gutters and downspouts. * * c... .. ?? .. SA. AIR CONDITIONER 8 Spring Fall Annually As Needed a. Central Unit: Clean or replace filter (usually located in fur- * * nace). ? Remove debris around compressor (located in outdoor * * 0/-,'0.' cabinet), and trim any nearby shrubbery...

  10. A straight-line strain method of analyzing reveted and bolted connections loaded with torsion into the plastic region

    E-Print Network [OSTI]

    Welch, Billy Jack

    1959-01-01T23:59:59.000Z

    or bolted connections loaded with torsion into the plastic region. The method is based on the assumption of a straight-line strain distribution among the rivets or bolts, and is analogous to the analysis of' a beam loaded into the plastic regions Load... listed in Table I ~ The maximum torsional moment for a connection as determined From straight ? line strain, straight ? line stress, and experi? mental tests are compared. These comparisons show that the straight-1 inc strain calcu let i ons yield...

  11. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T. [Science Applications International Corp., Dublin, OH (United States)

    1995-09-01T23:59:59.000Z

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  12. Development of a maintenance program

    SciTech Connect (OSTI)

    Walker, I.

    1987-01-01T23:59:59.000Z

    Bruce Nuclear Generating Station (NGS) A in Tiverton, Ontario, has been operating for 10 yr. One reason for its successful operating record is the development of an effective preventive maintenance program. Evaluation of the existing preventive program included a review of maintenance of selected key equipment over the life of the station. The review emphasized the need to improve the storage and sorting of maintenance information for trend and cost analysis, manpower planning, reliability, and radiation dose calculations.

  13. Sustainability of green space maintenance

    E-Print Network [OSTI]

    Nomura, Wataru

    2011-01-01T23:59:59.000Z

    In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

  14. Operations and Maintenance Program Implementation

    Broader source: Energy.gov [DOE]

    Implementing an effective operations and maintenance (O&M) program requires patience and persistence. This is especially true since no universal plan fits all Federal agencies.

  15. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009

    SciTech Connect (OSTI)

    None

    2010-10-01T23:59:59.000Z

    This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

  16. Asphalt, Concrete, and Turf Maintenance and Preservation

    E-Print Network [OSTI]

    Minnesota, University of

    preventive maintenance, pavement distress and identification, and best practices for the maintenance Consultant WSB and Associates, Inc. 763-287-7184 jstewart@wsbeng.com #12;2 Preventive Maintenance Preventive maintenance and minor rehab, and is often used to repair environmental damage. Preventive maintenance narrows

  17. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011

    SciTech Connect (OSTI)

    None

    2012-03-01T23:59:59.000Z

    This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

  18. Optimal scheduling of fighter aircraft maintenance

    E-Print Network [OSTI]

    Cho, Philip Y

    2011-01-01T23:59:59.000Z

    The effective scheduling of fighter aircraft maintenance in the Air Force is crucial to overall mission accomplishment. An effective maintenance scheduling policy maximizes the use of maintenance resources and aircraft ...

  19. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  20. Thermal Shock Effects Modeling On A Globe Valve Body-Bonnet Bolted Flange Joint

    E-Print Network [OSTI]

    Mathieu, Jean-Philippe; Ferrari, Jerome; Hersant, David

    2012-01-01T23:59:59.000Z

    This paper attends to show efforts made at EDF R&D to improve comprehension of valve parts loadings during operation. Thermal shock in a globe valve is represented and modeled using EDF R&D Finite Element Analysis code (Code_Aster). Choices of modeling are discussed and balanced on the basis of "what an engineer can obtain without becoming a researcher". First simulation results are presented. Attention is focused on the evolution of Body-Bonnet Bolted Flange Joint (BBBFJ) tightening forces which are simulated during the thermal shock. An experimental setup is also presented for the studied valve, which implies thermocouple implementation for comparison of the simulated thermal field and strain measurement on each threaded rod to validate the mechanical modeling.

  1. Predictive maintenance: Waterwall wastage

    SciTech Connect (OSTI)

    Rich, J.T.; Bilmanis, A. Jr.; Gandhi, R. [Potomac Electric Power Company, Washington, DC (United States)

    1996-07-01T23:59:59.000Z

    With the installation and use of burner systems to minimize NO, emissions, boiler waterwall wastage has become a more significant issue. This paper provides a description of an established inspection program to monitor waterwall wastage and other furnace issues that has now been developed into a predictive maintenance and condition-monitoring tool. This allows plant personnel to forecast the need for waterwall replacement activities and provides a basis for determining the effects of modifying boiler operating parameters affecting wastage. Potomac Electric Power Company (PEPCO), Washington, DC, has performed waterwall inspections of its boilers during planned overhauls for several years. These inspections consist of visual and ultrasonic thickness inspections of waterwall tubes at selected locations in the boiler. The ultrasonic thickness data collected is used to calculate current wastage rates, and to extrapolate tube wall thickness to the next planned outage. This information, along with the visual inspection data and panel replacement/repair history is used to select replacement and repair locations for the current outage, and to plan the replacement strategy for the next planned outage. A computer program has been developed to aid in the analysis of the data, and to provide plots of waterwall repair/replacement history as well as wall thickness and wastage rate information. The principal goals driving this program are to: (1) eliminate tube leaks between planned overhauls; (2) provide data to the outage managers for use in making replacement decisions; (3) determine wastage patterns; (4) forecast future replacement and repair needs; and (5) determine effect of changes to operating parameters on tube life. The waterwall condition monitoring program employed by PEPCO has proven to be successful in achieving its goals over the years. It must be emphasized that NDE is only one aspect of the program.

  2. Operations and Maintenance Program Management

    Broader source: Energy.gov [DOE]

    Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into a cohesive entity.

  3. Operations and Maintenance Management Support

    Broader source: Energy.gov [DOE]

    Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

  4. Genetic variation and its maintenance

    SciTech Connect (OSTI)

    Roberts, D.F.; De Stefano, G.F.

    1986-01-01T23:59:59.000Z

    This book contains several papers divided among three sections. The section titles are: Genetic Diversity--Its Dimensions; Genetic Diversity--Its Origin and Maintenance; and Genetic Diversity--Applications and Problems of Complex Characters.

  5. Maintenance Practices for LED Streetlights

    Broader source: Energy.gov [DOE]

    This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

  6. Business Development - Predictive Maintenance Products

    E-Print Network [OSTI]

    Sceiczina, P.

    2005-01-01T23:59:59.000Z

    BUSINESS DEVELOPMENT - PREDICTIVE MAINTENANCE PRODUCTS Phillip Sceiczina, ifm efector, inc. In this time of global competitiveness, more companies are focusing on reducing manufacturing costs to increase profits. Energy costs can be a... significant portion of a company?s manufacturing costs. Compressed air leakage is often an overlooked area in predictive maintenance programs, however it greatly impacts the amount of electricity required to run a plant. This paper quantifies the cost...

  7. Turfgrass: Maintenance Costs in Texas.

    E-Print Network [OSTI]

    Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

    1964-01-01T23:59:59.000Z

    . These regions also have high water costs. The Gulf Coast, where water is a minor item, has an average expenditure only slightly greater than half that in West Texas. Average lawn sizes in these two regions are almost identical. Use of com- post, commercial.... Individuals with grasses other than bermuda and St. Augustine spend on the average about 53 percent TARLE 2. TOTALS OF VARIOUS HOME LAWN MAINTENANCE EXPENDITURES WITHIN REGIONS AND FOR THE STATE1 Number of Maintenance items Region households Commercial...

  8. Module 10: Maintenance and Fueling Guidelines

    Broader source: Energy.gov [DOE]

    This course covers safety guidelines for hydrogen, safe maintenance facilities, safety guidelines for hydrogen fueling facilities

  9. Dynamic Scheduling of Maintenance Activities Under Uncertainties

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of the required treatment. There are mainly two types of maintenance activities: the preventive maintenance, whoseDynamic Scheduling of Maintenance Activities Under Uncertainties Fran¸cois Marmier, Christophe in maintenance services field where the different practical knowledges or skills are their working tools. We

  10. The International Coal Statistics Data Base program maintenance guide

    SciTech Connect (OSTI)

    Not Available

    1991-06-01T23:59:59.000Z

    The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig.

  11. Operations and Maintenance Manual for Large Aperture Scanner System

    SciTech Connect (OSTI)

    Jones, Anthony M.; Hall, Thomas E.

    2010-04-08T23:59:59.000Z

    Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

  12. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010

    SciTech Connect (OSTI)

    None

    2011-03-01T23:59:59.000Z

    This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

  13. Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    : When to perform a particular maintenance action? What components should benefit from a preventive maintenance action? Which components should first benefit from a preventive maintenance interventionOpportune maintenance and predictive maintenance decision support Ă?douard Thomas, Ă?ric Levrat

  14. Airline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches

    E-Print Network [OSTI]

    -based. The preventative alternative involves the transmission of maintenance data to maintenance personnel whenAirline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches Mike Dupuy, Dan Wesely, Cody Jenkins Abstract ­ Airline maintenance is a significant contributor

  15. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J. [Dofasco Inc., Hamilton, Ontario (Canada)

    1996-12-31T23:59:59.000Z

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  16. Community Wind Handbook/Plan for Maintenance | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png ElColumbia, NorthCommunity ManagementMaintenance <

  17. Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternative FuelsSanta3 Table 3.EnergyAug412 Archive DataAnnualAnnual

  18. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  19. Maintenance FUSION IGNITION RESEARCH EXPERIMENT

    E-Print Network [OSTI]

    Insulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM coils. The magnets are liquid nitrogen cooled and the entire device is surrounded by a thermal enclosure. The double wall vacuum vessel integrates cooling and shielding in a shape that maximizes shielding of ex

  20. Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM)

    Broader source: Energy.gov [DOE]

    Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND...

  1. Improving maintenance operation through transformational outsourcing

    E-Print Network [OSTI]

    Ye, Jacqueline Ming-Shih

    2007-01-01T23:59:59.000Z

    Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

  2. Maintenance cost studies of present aircraft subsystems

    E-Print Network [OSTI]

    Pearlman, Chaim Herman Shalom

    1966-01-01T23:59:59.000Z

    This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

  3. Information Technology for Energy and Maintenance Management 

    E-Print Network [OSTI]

    Villafana, L.; Federspiel, C.

    2003-01-01T23:59:59.000Z

    and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses...

  4. Information Technology for Energy and Maintenance Management

    E-Print Network [OSTI]

    Villafana, L.; Federspiel, C.

    2003-01-01T23:59:59.000Z

    and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses...

  5. Scalable Coverage Maintenance for Dense Wireless Sensor Networks

    E-Print Network [OSTI]

    Lu, Jun; Wang, Jinsu; Suda, Tatsuya

    2007-01-01T23:59:59.000Z

    an ef- ficient coverage maintenance protocol for distributedArticle Scalable Coverage Maintenance for Dense Wirelessbattery energy. Coverage maintenance schemes can e?ectively

  6. Adolescents' Maintenance of Family Connectedness in Their Everyday Lives

    E-Print Network [OSTI]

    Tsai, Kim M

    2014-01-01T23:59:59.000Z

    may challenge adolescents’ maintenance of leisure time withLos Angeles Adolescents’ Maintenance of Family ConnectednessAdolescents’ Maintenance of Family Connectedness in Their

  7. Mechanisms Regulating Specification and Maintenance of Pancreatic Cell Fate

    E-Print Network [OSTI]

    Kanji, Murtaza Shabbir

    2013-01-01T23:59:59.000Z

    et al. , SOX9 is required for maintenance of the pancreaticstem cells for tissue maintenance? Cell Cycle, 2004. 3(9):cell specification and maintenance. ” Larry Hillblom Islet

  8. Dialect Contact, Convergence, and Maintenance in Oregon Athabaskan

    E-Print Network [OSTI]

    Spence, Justin

    2013-01-01T23:59:59.000Z

    Contact, Convergence, and Maintenance in Oregon AthabaskanContact, Convergence, and Maintenance in Oregon Athabaskan Jcases of dialect maintenance presented in §5 show that not

  9. USE OF EMBEDDED MICROCOMPUTERS IN SYSTEM DEBUGGING AND MAINTENANCE

    E-Print Network [OSTI]

    Meng, John

    2014-01-01T23:59:59.000Z

    IN SYSTEM DEBUGGING AND MAINTENANCE John Meng and Dan WeaverIN SYSTEM DEBUGGING AND MAINTENANCE John Meng and Dan Weaverflexible debugging and maintenance devices by switching in

  10. Robust Maintenance Policies for Markovian Systems under Model Uncertainty

    E-Print Network [OSTI]

    Kuhn, Kenneth D.; Madanat, Samer M.

    2005-01-01T23:59:59.000Z

    Robust Maintenance Policies for Markovian Systems underWu, M.I. (1987), Optimal maintenance decisions for pavementapproach may reduce maintenance and rehabilitation (M&R)

  11. WSDOT highway maintenance: environmental compliance for protected terrestrial species

    E-Print Network [OSTI]

    O’Brien, Tracie; Carey, Marion; Forrester, Bret

    2005-01-01T23:59:59.000Z

    of the WSDOT Highway Maintenance: Environmental Complianceand the Highway Maintenance Manual for Terrestrial Species.to impacts from routine maintenance activities. In response

  12. Regeneration and Maintenance of Intestinal Smooth Muscle Phenotypes.

    E-Print Network [OSTI]

    Walthers, Christopher

    2014-01-01T23:59:59.000Z

    smooth muscle cell maintenance by basic fibroblast growthsmooth muscle cell maintenance by basic fibroblast growthsmooth muscle cell maintenance by basic fibroblast growth

  13. Robust maintenance policies for Markovian systems under model uncertainty

    E-Print Network [OSTI]

    Kuhn, K D; Madanat, S M

    2006-01-01T23:59:59.000Z

    Robust Maintenance Policies for Markovian Systems underWu, M.I. (1987), Optimal maintenance decisions for pavementapproach may reduce maintenance and rehabilitation (M&R)

  14. Annual Reports | Department of Energy

    Energy Savers [EERE]

    2000 (pdf) Annual Report for 1999 (pdf) Annual Report for 1998 (pdf) Annual Report for 1997 (pdf) Annual Report for 1996 (pdf) Annual Report for 1995 (pdf) Annual Report for 1994...

  15. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  19. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  20. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Maintenance and Prevention: Formalization and Fixpoint Characterization

    E-Print Network [OSTI]

    Maintenance and Prevention: Formalization and Fixpoint Characterization Munindar P. Singh Maintenance and prevention are important concepts in the science of intel­ ligent systems, yet serious research attention. Maintenance and prevention are duals of each other, but cannot be reduced

  6. ROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    activities: the preventive maintenance, whose activities can be long term planned, and the correctiveROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE François MARMIER , Christophe VARNIER. Especially in the field of maintenance services where the different practical knowledge or skills

  7. Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing

    E-Print Network [OSTI]

    Marcus, Steven I.

    1 Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Xiaodong Yao, Emmanuel on Control Applications in 2001. #12;2 Abstract Preventive Maintenance (PM) scheduling is a very challenging schedule with that of a baseline reference schedule are also presented. Index Terms preventive maintenance

  8. Prognostics for the Maintenance of Distributed Systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    but also higher level function prognosis. I. INTRODUCTION In the classical case, preventive maintenance of preventive maintenance for complex systems. In this sense, a distributed system can be split down into a setPrognostics for the Maintenance of Distributed Systems Pauline Ribot, Yannick Pencol´e and Michel

  9. Preventative Maintenance (PM) Policy Outline the policy regarding preventative vehicle maintenance on University of Michigan (U-

    E-Print Network [OSTI]

    Kirschner, Denise

    Preventative Maintenance (PM) Policy Objective Outline the policy regarding preventative vehicle maintenance on University of Michigan (U- M) vehicles. Policy 1. All maintenance performed on U-M vehicles their own campus maintenance facility to repair their fleet vehicles. 2. To ensure proper stewardship of U

  10. Vehicle Maintenance Policy Outline the policy regarding vehicle maintenance at University of Michigan (U-M).

    E-Print Network [OSTI]

    Kirschner, Denise

    Vehicle Maintenance Policy Objective Outline the policy regarding vehicle maintenance at University of Michigan (U-M). Policy 1. All maintenance performed on U-M vehicles must be coordinated through Garage to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine maintenance

  11. Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao

    E-Print Network [OSTI]

    Marcus, Steven I.

    Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao SAS Institute Inc. Cary preventive maintenance (PM) and production policies for an unreliable production-inventory system in which to establish some additional structural properties. Keywords: optimal preventive maintenance, joint maintenance

  12. Pacific Northwest Laboratory Maintenance Implementation plan

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-06-01T23:59:59.000Z

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  13. Pacific Northwest Laboratory Maintenance Implementation plan

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-06-01T23:59:59.000Z

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  14. Annual Report

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0 ARRA NewslettersPartnership of the Americas |AnchorageAnnaofAnnual

  15. Annual Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergyDepartment ofATVMAgriculturalAn1 Annual FOIA09 THROUGH 09/30/2010

  16. Annual Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'s Reply Comments AT&T,FACT SAmesEnergyAnnual Planning Summaries:1

  17. Annual Report

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCOSystemsProgram OverviewAdvocate -AmirAnnual Report Fiscal Year 2011 Office of

  18. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum...

  19. CRAD, Maintenance - Los Alamos National Laboratory Waste Characterizat...

    Office of Environmental Management (EM)

    Maintenance - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Maintenance - Los Alamos National Laboratory Waste Characterization,...

  20. Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office...

    Broader source: Energy.gov (indexed) [DOE]

    MAINTENANCE Assessment Plan NNSANevada Site Office Facility Representative Division Performance Objective: An effective facilities maintenance program should optimize the material...

  1. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Maintenance Manual for ECMs including: New written operations procedures; Preventive maintenance work procedures and checklists. Project Acceptance IDIQ Attachment...

  2. A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling Problem in the Robustness

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling production and Preventive Maintenance (PM) scheduling problem in the robustness framework. The contributions equipment reliability and performance loss under disruption Key words: Production, Preventive maintenance

  3. Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source

    E-Print Network [OSTI]

    Slatton, Clint

    Estimated Annual Amount For Amount Source STATE UNIVERSITY SYSTEM 2012-2013 Fixed Capital Outlay ProjectsProject Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description that will respond to the latest trends in small-group learning, technology resources, and collaboration spaces

  4. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01T23:59:59.000Z

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  5. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01T23:59:59.000Z

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  6. DROP TESTS RESULTS OF REVISED CLOSURE BOLT CONFIGURATION OF THE STANDARD WASTE BOX, STANDARD LARGE BOX 2, AND TEN DRUM OVERPACK PACKAGINGS

    SciTech Connect (OSTI)

    May, C.; Opperman, E.; Mckeel, C.

    2010-04-15T23:59:59.000Z

    The Transuranic (TRU) Disposition Project at Savannah River Site will require numerous transfers of radioactive materials within the site boundaries for sorting and repackaging. The three DOT Type A shipping packagings planned for this work have numerous bolts for securing the lids to the body of the packagings. In an effort to reduce operator time to open and close the packages during onsite transfers, thus reducing personnel exposure and costs, an evaluation was performed to analyze the effects of reducing the number of bolts required to secure the lid to the packaging body. The evaluation showed the reduction to one-third of the original number of bolts had no effect on the packagings capability to sustain vibratory loads, shipping loads, internal pressure loads, and the loads resulting from a 4-ft drop. However, the loads caused by the 4-ft drop are difficult to estimate and the study recommended each of the packages be dropped to show the actual effects on the package closure. Even with reduced bolting, the packagings were still required to meet the 49 CFR 178.350 performance criteria for Type A packaging. This paper discusses the effects and results of the drop testing of the three packagings.

  7. BPAT Systems Maintenance - April 10, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 4102015 BPAT's e-Tag and OASIS software vendor will be performing...

  8. BPAT Systems Maintenance - May 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training BPAT Systems Maintenance Posted date: 562015 BPAT's e-Tag and OASIS software vendor will be performing...

  9. BPAT Systems Maintenance - May 14, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training BPAT Systems Maintenance Posted Date: 5142015 BPAT's e-Tag and OASIS software vendor will be performing...

  10. BPAT Systems Maintenance - April 21, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training BPAT Systems Maintenance Posted Date: 4212015 BPAT's e-Tag and OASIS software vendor will be performing...

  11. BPAT Systems Maintenance - May 13, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 5132015 BPAT's e-Tag and OASIS software vendor will be performing...

  12. Sandia National Laboratories: Operations and Maintenance Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Hosted by Sandia National Laboratories and the Electric Power Research Institute (EPRI) The 2013 PV Operations and Maintenance Workshop, hosted by Sandia National...

  13. Risk-based budgeting for maintenance dredging

    SciTech Connect (OSTI)

    Walsh, M.R.; Moser, D.A. [Army Corps of Engineers, Ft. Belvoir, VA (United States). Inst. for Water Resources

    1994-12-31T23:59:59.000Z

    The US Army Corps of Engineers must estimate the budget required to conduct maintenance dredging at hundreds of sites across the country. The amount of funds needed to do the maintenance dredging is highly uncertain and there are risks associated with overestimates and underestimates. A risk-based approach to the budgeting process for maintenance dredging can help identify the uncertainty and assess and manage the associated risk. A concept and preliminary plan for a risk-based approach for developing budgets for maintenance dredging is presented.

  14. Scheduling with Fixed Maintenance, Shared Resources and ...

    E-Print Network [OSTI]

    Christina N Burt

    2014-11-30T23:59:59.000Z

    Nov 30, 2014 ... Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: a Mine Planning Case Study. Christina N Burt ...

  15. Optimization Online - Optimizing Preventive Maintenance Models

    E-Print Network [OSTI]

    Michael Bartholomew-Biggs

    2004-06-29T23:59:59.000Z

    Jun 29, 2004 ... Abstract: We deal with the problem of scheduling preventive maintenance (PM) by minimizing a performance function which reflects repair and ...

  16. Sandia National Laboratories: PV Reliability Operations Maintenance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance database Sandia-Electric Power Research Institute Partnership Publishes Photovoltaic Reliability Report On January 21, 2014, in Energy, Facilities, Grid...

  17. Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker

    E-Print Network [OSTI]

    Natti, Satish

    2010-01-14T23:59:59.000Z

    New maintenance techniques for circuit breakers are studied in this dissertation by proposing a probabilistic maintenance model and a new methodology to assess circuit breaker condition utilizing its control circuit data. A risk-based decision...

  18. Section 6 -Facilities Usage and Maintenance A. Facilities Usage and Maintenance

    E-Print Network [OSTI]

    Pantaleone, Jim

    Section 6 - Facilities Usage and Maintenance A. Facilities Usage and Maintenance 1 be held financially responsible. Financial responsibility extends to abandoned belongings, excessive is not permitted under any circumstances. Storage facilities are provided in most student housing units for storing

  19. 2008 Annual Report

    SciTech Connect (OSTI)

    none,

    2008-01-01T23:59:59.000Z

    This annual report includes: a brief overview of Western; FY 2008 operational highlights; and financial data.

  20. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |JilinLu an Group Jump to:Macquarie EnergyMahindra REVAMainsailforHome

  1. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    McMaster, B.W. [Univ. of Tennessee, Knoxville, TN (United States); Jones, S.B.; Sitzler, J.L. [Oak Ridge National Lab., TN (United States)

    1995-06-01T23:59:59.000Z

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.

  2. Vehicle Maintenance Procedure Outline the procedure for vehicle maintenance at University of Michigan (U-M).

    E-Print Network [OSTI]

    Kirschner, Denise

    Vehicle Maintenance Procedure Objective Outline the procedure for vehicle maintenance at University of Michigan (U-M). Procedure 1. Your U-M vehicle has a mechanical and/or safety issue. 2. Contact Garage of the vehicle or if needed, have the vehicle towed to the maintenance facility. 4. If a loaner is needed while

  3. Void Fraction Instrument operation and maintenance manual

    SciTech Connect (OSTI)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01T23:59:59.000Z

    This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

  4. Effort estimation for corrective software maintenance

    E-Print Network [OSTI]

    Bae, Doo-Hwan

    Stefanucci Proceedings of the 14th international conference on software engineering and knowledge engineering estimating Size Duration Staff Costs Effort #12;4/20 Introduction (2/2) · Effort estimation ­ Is a valuable asset to maintenance managers in · Planning maintenance · Performing cost/benefits analysis · Approach

  5. Automatic Generation and Maintenance of Correct Spreadsheets

    E-Print Network [OSTI]

    Erwig, Martin

    of "spreadsheet maintenance safety": Up- date operations that are generated from a type-correct tem- plateAutomatic Generation and Maintenance of Correct Spreadsheets Martin Erwig School of EECS Oregon descriptors: D.2.2 [Software Engineering]: Design Tools and Techniques; D.2.7 [Soft- ware Engineering

  6. Maintenance Guide for Microirrigation Systems in the

    E-Print Network [OSTI]

    Maintenance Guide for Microirrigation Systems in the Southern Region By The Irrigation Water-monitoring devices to evaluate cleaning 5. Remedial maintenance for micro-irrigation systems affected by scaling are technically more complex than overhead sprinkler or flood irrigation systems. They require significant

  7. Functional Prognostic Architecture for the Maintenance of Complex Systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    their functions by new ones. In order to optimize the maintenance cost, it is necessary to perform preventive maintenance to prevent failure occur- rence. Preventive maintenance actions consist in replacing components the date of the next scheduled maintenance phase. In the classical case, preventive maintenance is only

  8. Diagnosis and prognosis for the maintenance of complex systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    --Diagnosis, prognosis, preventive maintenance, complex systems. I. INTRODUCTION Nowadays, system maintenance is a key to decrease the maintenance cost, it is necessary to perform preventive maintenance [3], [4], [5] which alsoDiagnosis and prognosis for the maintenance of complex systems Pauline Ribot1,2 , Yannick Pencol´e1

  9. SNORKEL PRO-66 DAILY INSPECTION AND MAINTENANCE CHECKLIST

    E-Print Network [OSTI]

    Gelfond, Michael

    (installation, condition) 6 Battery terminals Visually inspect ( corrosion) 7 Battery fluid level Check fluid Oil leaks Visually inspect (hoses, tubes, fittings) 10 Tires Visually inspect (condition) 11 Bolts) 13 Guard rails Visually inspect condition 14 Platform gravity gate Visually inspect (operation) 15

  10. History-Dependent Optimization of Bridge Maintenance and Replacement Decisions Using Markov Decision Process

    E-Print Network [OSTI]

    Robelin, Charles-Antoine; Madanat, Samer M

    2007-01-01T23:59:59.000Z

    ?1997?. “Pontis: A system for maintenance optimization andcycle reliability-based maintenance cost optimization ofbridge inspection, maintenance and replacement optimization

  11. The role of Dynamin in muscle remodeling and maintenance

    E-Print Network [OSTI]

    Nguyen, Jennifer Kim Thu

    2011-01-01T23:59:59.000Z

    muscle attachment and maintenance. PLoS Genet 7, e1001295.in Muscle Remodeling and Maintenance A Thesis submitted inMuscle Remodeling and Maintenance by Jennifer Kim Thu Nguyen

  12. Maintenance scheduling for modular systems-models and algorithms

    E-Print Network [OSTI]

    Zarybnisky, Eric J. (Eric Jack), 1979-

    2011-01-01T23:59:59.000Z

    Maintenance scheduling is an integral part of many complex systems. For instance, without effective maintenance scheduling, the combined effects of preventative and corrective maintenance can have severe impacts on the ...

  13. Optimization models for improving periodic maintenance schedules by utilizing opportunities

    E-Print Network [OSTI]

    Patriksson, Michael

    to this as preventive maintenance activities at an oppor- tunity. The original opportunistic replacement problemOptimization models for improving periodic maintenance schedules by utilizing opportunities Torgny of Technology Abstract We present mathematical models for finding optimal opportunistic maintenance schedules

  14. Modelling maintenance for components under competing risk Helge Langseth

    E-Print Network [OSTI]

    Langseth, Helge

    preventively maintained. The preventive maintenance (PM) is performed periodically with some period , but PMModelling maintenance for components under competing risk Helge Langseth Norwegian University the mathematical modelling of imperfect maintenance of a system under competing risk. The model we propose

  15. Condition-Based Maintenance via Simulation and a Targeted Bayesian

    E-Print Network [OSTI]

    Ben-Gal, Irad E.

    malfunctioning. Accordingly, it is essential to undertake an effective preventive maintenance (PM) policyCondition-Based Maintenance via Simulation and a Targeted Bayesian Network Metamodel Aviv Gruber, Israel ABSTRACT Condition-based maintenance (CBM) is increasingly applied to operational systems

  16. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01T23:59:59.000Z

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  17. How to Determine and Verify Operating and Maintenance Savings...

    Energy Savers [EERE]

    How to Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in...

  18. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM...

  19. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He (0 Comments) There...

  20. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award for 2013 Prestige award Prestige Maintenance staff (left to right) Sandra Coltrain, Operations Managers John...

  1. North Area Right-of-Way Maintenance Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    North Area Right-of-Way Maintenance Project North Area Right-of-Way Maintenance Project Western FONSI (PDF - 487 KB) Final Environmental Assessment (PDF - 4200 KB) Environmental...

  2. air maintenance lufthansa: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summary: Automated and Scheduled Maintenance of Digital Library Collections Wendy Osborn and Steve Fox and scheduled maintenance of a digital library collection. Existing...

  3. FY 2014 Real Property Data Related to Operations and Maintenance...

    Office of Environmental Management (EM)

    FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

  4. PRI Annual Report 2004

    E-Print Network [OSTI]

    Maynard-Moody, Steven

    2005-04-01T23:59:59.000Z

    research found within the pages of this annual report. To bring you closer to some of our research projects, the 2004 Annual Report focuses on three projects. Two teams of researchers are using innovative methods to examine important international issues...

  5. Annual Report 2001 Annual Report 2001

    E-Print Network [OSTI]

    Habib, Ayman

    The Arctic Institute of North America Annual Report 2001 The Arctic Institute of North America Annual Report 2001 #12;2000 Board of Directors · James Raffan,Seeley's Bay,Ontario (Chair until September 2001) · Murray B. Todd, Calgary,Alberta (Chair as of September 2001) · Luc Bouthillier,Québec City

  6. Library Annual Report Library Annual Report

    E-Print Network [OSTI]

    Tobar, Michael

    Library Annual Report 2007 Library Annual Report 2007 #12;www.library.uwa.edu.au Our mission: By delivering excellent information resources and services the Library is integral to the University's mission of advancing, transmitting and sustaining knowledge. Our vision: The Library will continue to be at the heart

  7. NASEO 2015 Annual Meeting

    Broader source: Energy.gov [DOE]

    The National Association of State Energy Officials (NASEO) Annual Meeting will be held in San Diego, California.

  8. 2011 -2012 Annual Report

    E-Print Network [OSTI]

    Yang, Zong-Liang

    2011 2012 Annual Report #12;2011 - 2012 Annual Report 2 INTRODUCING CAR SHARING Since the car share,116 Carpools 420 430 430 Car Share Members -- -- 661 #12;2011 - 2012 Annual Report 4 GARAGE PARKING INVENTORY or day, and gives the com- munity yet another reason to leave their cars at home. In its launch

  9. BPAT Systems Maintenance - April 8, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 482015 BPAT's e-Tag and OASIS software vendor will be performing a...

  10. BPAT Systems Maintenance - March 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 362015 BPAT's e-Tag and OASIS software vendor will be performing a...

  11. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's e-Tag and OASIS software vendor will be performing a...

  12. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's e-Tag and OASIS software vendor will be performing a...

  13. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's e-Tag and OASIS software vendor will be performing a...

  14. Risk impact of maintenance program changes

    E-Print Network [OSTI]

    Credit, Kimberly A. (Kimberly April)

    1992-01-01T23:59:59.000Z

    This study quantifies the change in one measure of plant risk, the frequency of loss of long-term decay heat removal, due to changes in maintenance at the James A. Fitzpatrick (JAF) plant. Quantification is accomplished ...

  15. Low-Maintenance Wind Power System

    E-Print Network [OSTI]

    Rasson, Joseph E

    2010-01-01T23:59:59.000Z

    with widespread adoption of wind energy. The project hasProject: Low-Maintenance Wind Power System Summary of theImproved Vertical Axis Wind Turbine and Aerodynamic Control

  16. Operations and Maintenance for Major Equipment Types

    Broader source: Energy.gov [DOE]

    Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

  17. A case model for predictive maintenance

    E-Print Network [OSTI]

    Li, Jiawei, M. Eng. Massachusetts Institute of Technology

    2008-01-01T23:59:59.000Z

    This project is to respond to a need by Varian Semiconductor Equipment Associates, Inc. (VSEA) to help predict failure of ion implanters. Predictive maintenance would help to reduce the unscheduled downtime of ion implanters, ...

  18. Significantly reduce maintenance time Documents&Mediabecomesthekey

    E-Print Network [OSTI]

    Mullins, Dyche

    Significantly reduce maintenance time · Documents&Mediabecomesthekey contactforallmaintenanceneeds. · MajorpartsarestoredbyDocuments& MediaattheMissionCenter.Thisreduces thetimeneededtoorderpartsandresultsin&Mediaoffersthecampus communityaconvenientandeconomicsolution foritscopiers,multifunctiondevicesandprinter needs. Print Management Program advantages Reduce

  19. Optimal Preventive Maintenance Under Decision Dependent Uncertainty

    SciTech Connect (OSTI)

    Galenko, Alexander; Popova, Elmira [University of Texas at Austin, 1 University Station, Austin, Texas 78712 (United States); Kee, Ernie; Grantom, Rick [South Texas Project Nuclear Operating Company - STPNOC, P.O. Box 289, Wadsworth, Tx 77483 (United States)

    2006-07-01T23:59:59.000Z

    We analyze a system of N components with dependent failure times. The goal is to obtain the optimal block replacement interval (different for each component) over a finite horizon that minimizes the expected total maintenance cost. In addition, we allow each preventive maintenance action to change the future joint failure time distribution. We illustrate our methodology with an example from South Texas Project Nuclear Operating Company. (authors)

  20. Thermography for Preventive Maintenance and Conservation

    E-Print Network [OSTI]

    Lopez, T.

    1979-01-01T23:59:59.000Z

    THERMOGRAPHY FOR PREVENTIVE MAINTENANCE AND CONSERVATION Tony Lopez Southern California Gas Company Los Angles, California The Supply Situation With fuel prices soaring, more and more companies are looking at energy management as a means... years. In the last twenty years, however, other applica tions have been developed for thermography. Some of these include: medicine, nondestructive testi:ng, aerial land mapping, preventive maintenance and conservation. The balance of this paper...

  1. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

    1996-08-01T23:59:59.000Z

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  2. NERI 2004 Annual Report

    SciTech Connect (OSTI)

    None

    2004-01-01T23:59:59.000Z

    The United States Department of Energy (DOE) created the Nuclear Energy Research Initiative (NERI) in Fiscal Year (FY) 1999 in response to recommendations provided by the President's Committee of Advisors on Science and Technology. The purpose of NERI is to sponsor research and development (R&D) in the nuclear energy sciences to address the principal barriers to the future use of nuclear energy in the United States. NERI is helping to preserve the nuclear science and engineering infrastructure within the Nation's universities, laboratories, and industry, and is advancing the development of nuclear energy technology, enabling the United States to maintain a competitive position in nuclear science and technology. Research under this initiative also addresses issues associated with the maintenance of existing U.S. nuclear plants. The NERI program is managed and funded by DOE's Office of Nuclear Energy, Science and Technology. ''The Nuclear Energy Research Initiative 2004 Annual Report'' serves to inform interested parties of progress made in NERI on a programmatic level as well as research progress made on individual NERI projects. Section 2 of this report provides background on the creation and implementation of NERI and on the focus areas for NERI research. Section 3 provides a discussion on NERI's mission, goals and objectives, and work scope. Section 4 highlights the major accomplishments of the NERI projects and provides brief summaries of the NERI research efforts that were completed in 2004. Section 5 provides a discussion on the impact NERI has had on U.S. university nuclear programs. Sections 6 through 8 provide project status reports by research area for each of the fiscal year (FY) 2001 and 2002 projects that were active in FY 2004. Research objectives, progress made over the last year, and activities planned for the next year are described for each project. Sections 9 through 11 present each of the newly awarded 2005 NERI projects in their corresponding focus area. Each abstract includes a brief description of the project, its proposed work scope, and its participants. Project numbers are designated by the FY in which the award was made. At the end of the document, there is an Index of NERI Projects grouped by FY and sequentially ordered by project number.

  3. Reference: RGL 81-01 Subject: NATIONWIDE PERMIT-MAINTENANCE

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Reference: RGL 81-01 Subject: NATIONWIDE PERMIT-MAINTENANCE Title: MAINTENANCE DREDGING TO MAINTAIN EXISTING STRUCTURE IN SEC 10 WATERS DOES NOT AUTHORIZE MAINTENANCE DREDGING (1977 REGS). 1 applicable to maintenance dredging. 2. Nationwide permit 322.4(c) authorizes the repair, rehabilitation

  4. University Marketing Communications UMC Web Site Maintenance Service

    E-Print Network [OSTI]

    Sibille, Etienne

    University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

  5. Towards a maintenance and servicing indicator Pascal Vrignat 1

    E-Print Network [OSTI]

    Boyer, Edmond

    : Preventive Maintenance, Maintenance planning, Hidden Markov Model, Failure detection. 1 Introduction, events may be prevented by applying a correct maintenance policy. Some tankers may not have sunk if some maintenance had been correctly applied. Factory should not have exploded with some preventive control

  6. Kernel spectral clustering for predicting maintenance of industrial machines

    E-Print Network [OSTI]

    to deal with sensory faults have been used [1],[2],[3]: corrective maintenance, preventive maintenance the machine fails, it is expensive and safety and environment issues arise. Preventive maintenance is basedKernel spectral clustering for predicting maintenance of industrial machines Rocco Langone1, Carlos

  7. Grouping maintenance strategy with availability constraint under limited

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    with significant assumptions: maintenance durations are neglected and only one preventive maintenance for eachGrouping maintenance strategy with availability constraint under limited repairmen Phuc Do Van Hai maintenance strategies of multi-component systems by integrating two efficient optimization algorithms

  8. Performance evaluation of centralized maintenance workshop by using Queuing Networks

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    maintenance types: Preventive maintenance: different actions are programmed in cycle periods; CorrectivePerformance evaluation of centralized maintenance workshop by using Queuing Networks Zineb Simeu: Maintenance workshop integrated in the job-shop system is required in order to maintain the production

  9. Maintenance and long life of manjemen & pengelolaan dan

    E-Print Network [OSTI]

    Stoffelen, Ad

    : SACA&D Maintenance ­ p.6 #12;ensure operability What does this mean? · preventive maintenanceMaintenance and long life of SACA&D manjemen & pengelolaan dan umur panjang Gerard van der Schrier KNMI BMKG: SACA&D Maintenance ­ p.1 #12;Why SACA&D extreme weather and food security Jakarta Post, 10

  10. Comparison of Selected Model Evaluation Criteria for Maintenance Applications

    E-Print Network [OSTI]

    Huang, Samuel H.

    , Louisville, KY 40292, USA Model-based preventive maintenance relies on creating models that can either loss, and as a whole a sluggish system, the focus has shifted to preventive maintenance. Computerized maintenance systems aid in improving the efficiency of maintenance tasks [28]. The approach of preventive

  11. Optimal Maintenance Scheduling of a Gas Engine Power Plant

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    to carry out preventive maintenance at regular intervals19 . The maintenance schedule affects many short1 Optimal Maintenance Scheduling of a Gas Engine Power Plant using Generalized Disjunctive with parallel units. Gas engines are shutdown according to a regular maintenance plan that limits the number

  12. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01T23:59:59.000Z

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  13. Elevated high-density lipoprotein cholesterol and cardiovascular mortality in maintenance hemodialysis patients

    E-Print Network [OSTI]

    Moradi, H; Streja, E; Kashyap, ML; Vaziri, ND; Fonarow, GC; Kalantar-Zadeh, K

    2014-01-01T23:59:59.000Z

    of mortality in maintenance hemo- dialysis patients. Clin Jindices and survival in maintenance hemodialysis patients

  14. Intimacy, Manipulation, and the Maintenance of Social Boundaries at San Quentin Prison

    E-Print Network [OSTI]

    Lindahl, Nicole

    2011-01-01T23:59:59.000Z

    Manipulation, and the Maintenance of Social Boundaries atand volunteers to explore the maintenance and regulation of

  15. maintenance. This research is relevant to opera-tions and maintenance challenges facing aging

    E-Print Network [OSTI]

    the need for preventive maintenance or other diagnostic activities on the physical system. Simulationsmaintenance. This research is relevant to opera- tions and maintenance challenges facing aging-benefit of extending the time between overhauls. reducing the probability of a failure in the field. and preventive

  16. A Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL-MORELLO*, Noureddine ZERHOUNI*

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    - ing to different strategies (preventive maintenance, predictive maintenance, correc- tive maintenanceA Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL of information and communication technol- ogies has resulted in a variety of maintenance support systems

  17. EMSL 2009 Annual Report

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

    2010-02-26T23:59:59.000Z

    The EMSL 2009 Annual Report describes the science conducted at EMSL during 2009 as well as outreach activities and awards and honors received by users and staff.

  18. Historical Natural Gas Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual . 1996 Published October 1997 1997 Published October 1998 1998 Published October 1999 1999 Published October 2000 2000 Published December 2001...

  19. Annual Energy Outlook 2012

    Gasoline and Diesel Fuel Update (EIA)

    Administration Annual Energy Outlook 2012 17 Table A7. Transportation sector key indicators and delivered energy consumption (continued) Key indicators and consumption...

  20. Annual Energy Outlook 2012

    Gasoline and Diesel Fuel Update (EIA)

    3 U.S. Energy Information Administration | Annual Energy Outlook 2012 Reference case Table A6. Industrial sector key indicators and consumption Energy Information Administration ...

  1. Annual Energy Outlook 2012

    Gasoline and Diesel Fuel Update (EIA)

    36 Reference case Energy Information Administration Annual Energy Outlook 2012 6 Table A3. Energy prices by sector and source (2010 dollars per million Btu, unless otherwise...

  2. Annual Energy Outlook 2012

    Gasoline and Diesel Fuel Update (EIA)

    1 U.S. Energy Information Administration | Annual Energy Outlook 2012 Reference case Table A5. Commercial sector key indicators and consumption (quadrillion Btu per year, unless...

  3. Annual Energy Outlook 2012

    Gasoline and Diesel Fuel Update (EIA)

    9 U.S. Energy Information Administration | Annual Energy Outlook 2012 Table G1. Heat rates Fuel Units Approximate heat content Coal 1 Production . . . . . . . . . . . . . . . . . ....

  4. Annual Energy Outlook 2012

    Gasoline and Diesel Fuel Update (EIA)

    for Defense Districts 216 U.S. Energy Information Administration Annual Energy Outlook 2010 Figure F3. Petroleum Administration for Defense Districts AK WA NV AZ OR...

  5. Annual Energy Outlook 2012

    Gasoline and Diesel Fuel Update (EIA)

    end of table. (continued on next page) U.S. Energy Information Administration | Annual Energy Outlook 2012 116 Comparison with other projections Table 28. Comparison of coal...

  6. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

  7. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent receives...

  8. OPSI Annual Meeting

    Broader source: Energy.gov [DOE]

    The Organization of PJM States, Inc. (OPSI) is hosting its annual meeting in Chicago, IL, on October 13-14, 2014.

  9. SFU LIBRARY ANNUAL REPORT

    E-Print Network [OSTI]

    SFU LIBRARY ANNUAL REPORT 2006/07 #12;22 TABLE OF CONTENTS Message from the University Librarian................................................... ....................................... 7 WAC Bennett Library.................................................................. ....................................... 8 Samuel and Frances Belzberg Library

  10. 2007 Annual Report

    SciTech Connect (OSTI)

    none,

    2007-01-01T23:59:59.000Z

    This annual report includes: a brief overview of Western; FY 2007 highlights; FY 2007 Integrated Resource Planning, or IRP, survey; and financial data.

  11. Historical Natural Gas Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    8 The Historical Natural Gas Annual contains historical information on supply and disposition of natural gas at the national, regional, and State level as well as prices at...

  12. Historical Natural Gas Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    6 The Historical Natural Gas Annual contains historical information on supply and disposition of natural gas at the national, regional, and State level as well as prices at...

  13. Historical Natural Gas Annual

    U.S. Energy Information Administration (EIA) Indexed Site

    7 The Historical Natural Gas Annual contains historical information on supply and disposition of natural gas at the national, regional, and State level as well as prices at...

  14. Wind Energy Facility Reliability and Maintenance

    E-Print Network [OSTI]

    Ding, Yu

    Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

  15. PORTFOLIO OF POTENTIAL STRATEGIES IN AERONAUTIC MAINTENANCE

    SciTech Connect (OSTI)

    Rolet, S. [Structural Health Engineering department, EADS Innovation Works, Toulouse (France)

    2010-02-22T23:59:59.000Z

    EADS divisions aim more and more at developing services associated to their platforms. EADS divisions, like Airbus and Eurocopter, are investigating on services associated to their platforms in order to add them value. One possible service consists in structural maintenance operation assistance, especially for NDT operations performed by the customer. EADS Innovation Works envisages three different and complementary enhanced structural maintenance categories. Enhanced NDT improves standard NDT operation environment. This is made possible by the existence of 'smart' NDT tools that are computer based and therefore able to support other functions. These functions range from local smart data processing and display to remote expert assisted operation. Passive Sensor Network relies on sensors permanently installed on aircraft structure. Interrogation of sensors is performed on ground and off line (while structure is not loaded except by its own weight). It can be done at arbitrary times in order to determine structure health. The aim is to give easy access to some hidden ''hot spots,'' to reduce human factor in structure health assessment and optimize maintenance. Structural Health Monitoring goes a step beyond Passive Sensor Network, because interrogation units are on board the aircraft and may be connected to aircraft network. It allows to use on-line techniques such as adapted acoustic emission and to automatically raise an alarm when a defect appears in the structure. This paper presents these different ways of improving structural maintenance operations in service, with their respective advantages and limitations.

  16. A Ubiquitous Computing Environment for Aircraft Maintenance

    E-Print Network [OSTI]

    practical experience from a project that was carried out in cooperation with an aircraft company1 and SAP SI level of usability. A scenario, a systems architecture, and maintenance applications are presented Descriptors J.7 [Computer Applications]: Computers in Other Systems ­ industrial control, process control

  17. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25T23:59:59.000Z

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  18. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    NONE

    1994-09-01T23:59:59.000Z

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  19. A process for risk-focused maintenance

    SciTech Connect (OSTI)

    Lofgren, E.V.; Cooper, S.E.; Kurth, R.E.; Phillips, L.B. (Science Applications International Corp., McLean, VA (USA))

    1991-03-01T23:59:59.000Z

    This report presents a process for focusing maintenance resources on components that enable nuclear plant systems to perform their essential functions and on components whose failure may initiate challenges to safety systems, so as to have the greatest impact in decreasing risk. The process provides criteria, based on risk, for deciding which components are critical to risk and determining what maintenance activities are required to ensure reliable operation of those risk-critical components. Two approaches are provided for selection of risk-critical components. One approach uses the results of a Probabilistic Risk Assessment (PRA); the other is based on the methodology developed for this report, which has a basis in PRA although it does not use the results of a PRA study. Following identification of risk-critical components, both approaches use a single methodology for determining what maintenance activities are required to ensure reliable operation of the identified components. The report also provides demonstrations of application of the two approaches to selection of risk-critical components and demonstrations of application of the methodology for determining what maintenance activities are required to an active standby safety system, a normally operating system, and passive components. 5 refs., 11 figs., 1 tab.

  20. UNIVERSITY POLICE ANNUAL SECURITY

    E-Print Network [OSTI]

    Kulp, Mark

    UNIVERSITY POLICE 2013 ANNUAL SECURITY AND FIRE SAFETY GUIDE In compliance with the Jeanne Clery Disclosure of Campus Security Policy and Campus Crime Statistics Act The University of New Orleans. Please take a moment to read the following information. #12;ANNUAL SECURITY AND FIRE SAFETY GUIDE 2013

  1. Annual Energy Review, 2008

    SciTech Connect (OSTI)

    None

    2009-06-01T23:59:59.000Z

    The Annual Energy Review (AER) is the Energy Information Administration's (EIA) primary report of annual historical energy statistics. For many series, data begin with the year 1949. Included are statistics on total energy production, consumption, trade, and energy prices; overviews of petroleum, natural gas, coal, electricity, nuclear energy, renewable energy, and international energy; financial and environment indicators; and data unit conversions.

  2. Technical support section annual work plan for FY 1996

    SciTech Connect (OSTI)

    Adkissson, B.P.; Allison, K.L.; Hess, R.A.; Kunselman, C.W.; Odom, S.M.; Smelcer, D.R.

    1996-04-01T23:59:59.000Z

    The Technical Support Section (TSS) of the Instrumentation and Controls (I&C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R&D), engineering and instrument and computer systems managed by ORNL. It is the mission of TSS to support programs and policies of ORNL, emphasizing safety and ensuring cost-effective support for R&D. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from and driven directly by current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R&D programs because of attrition or budget cuts and the establishment of new facilities or environmental safety and health programs. TSS does not have an annual budget to cover operating expenses incurred in providing instrumentation maintenance support to ORNL. Each year TSS contacts ORNL division finance managers or division finance officers to obtain information concerning projected funding levels of programs and facilities they manage. Although TSS has no direct responsibility for the maintenance or repair of real property, it does perform breakdown maintenance, preventive maintenance and calibration of laboratory, production, and experimental equipment, all of which is used for programmatic purposes. Operating expense funds from supported divisions support this type of equipment.

  3. 2004 ANNUAL REPORT 2004 NHMFL ANNUAL REPORT

    E-Print Network [OSTI]

    Weston, Ken

    1 Year in Review 11 Year in Review 11 Year in Review 11 Year in Review 1 2 Science & Research formats for individuals with print-related accessibility needs. #12;2004 ANNUAL REPORT 1 Chapter 1 YEAR IN REVIEW 2004: The Magnet Lab Transitions into Its Second Decade Less than six months after stepping down

  4. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Broader source: Energy.gov (indexed) [DOE]

    The Long-Term Surveillance Operations and Maintenance (LTS-O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE)...

  5. North Area Right-of-Way Maintenance Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sacramento Valley Right-of-Way Maintenance Project Sacramento Valley Right-of-Way Maintenance Project Final EA Report Cover Vol I August 2005(PDF - 492 MG) Final EA Main Volume...

  6. WINCO maintenance before and after DOE 4330.4A

    SciTech Connect (OSTI)

    Remsburg, R.E.

    1993-04-27T23:59:59.000Z

    This report discusses numerous elements of the maintenance program at the Idaho Chemical Processing Plant (ICPP) which have undergone changes during the last 5 years. Looking back, many of the maintenance program changes prior to 1991 were fragmented. Maintenance program elements were being ratcheted to address specific productivity and safety concerns. The improvements were warranted, but often improvements were implemented without a systematic review of how they impacted other maintenance program elements. After 1990 when WINCO began using the Chapter II guidelines of DOE Order 4330.4A as a maintenance program model, there was a marked improvement in the quality of the maintenance program changes. The post 1990 changes have been part of a systematic plan that has been communicated to all of the maintenance players. The Chapter II guidelines and the maintenance implementation plan (MIP) personnel with a focus for improvement that was missing prior to 1991.

  7. An Intact Centrosome Is Required for the Maintenance of Polarization during Directional Cell Migration

    E-Print Network [OSTI]

    Wakida, Nicole M.; Botvinick, Elliot L.; Lin, Justin; Berns, Michael W.

    2010-01-01T23:59:59.000Z

    Is Required for the Maintenance of Polarization duringis necessary for the maintenance of polarization duringa critical role in the maintenance of cytoskeletal asymmetry

  8. Study of LATERAL ORGAN BOUNDARIES (LOB) Genetic Pathways in Boundary Maintenance of Arabidopsis

    E-Print Network [OSTI]

    Yu, Lifeng

    2012-01-01T23:59:59.000Z

    Boundary formation and maintenance in tissue development.2002). Shoot meristem maintenance is controlled by a GRAS-et al. , 2005). The maintenance of the polarity of GA

  9. Adaptive Optimization and Systematic Probing of Infrastructure System Maintenance Policies under Model Uncertainty

    E-Print Network [OSTI]

    Madanat, S M; Park, Sejung; Kuhn, K D

    2006-01-01T23:59:59.000Z

    S. ?2002?. “Optimal maintenance and repair policies inM. I. ?1987?. “Optimal maintenance decisions for pavement?1997?. “Pontis: A system for maintenance optimization and

  10. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    E-Print Network [OSTI]

    Wang, Liping

    2014-01-01T23:59:59.000Z

    for Inspection and Maintenance of Commercial Building HVACCIBSE. 2008. Guide M, Maintenance engineering and managementDegradation due to Maintenance Issues Liping Wang, Tianzhen

  11. Access to Care for Methadone Maintenance Patients in the United States

    E-Print Network [OSTI]

    Hettema, Jennifer E.; Sorensen, James L.

    2009-01-01T23:59:59.000Z

    J. L. (2007). Methadone maintenance therapy in residentialet al. 2006). Methadone maintenance therapy (MMT) has highlyto Care for Methadone Maintenance Patients in the United

  12. Defining a genetic framework for stem cell niche maintenance in the Drosophila testis

    E-Print Network [OSTI]

    Voog, Justin C.

    2009-01-01T23:59:59.000Z

    that promote stem cell maintenance throughout life. (2008)M. , and Nagasawa, T. Maintenance of the hematopoietic stemis essential for the maintenance and division of germline

  13. Novel role of caspase-8 in the maintenance of epidermal regeneration and repair

    E-Print Network [OSTI]

    Lee, Pedro

    2011-01-01T23:59:59.000Z

    of caspase-like family in maintenance of cytoskeletonof Caspase-8 in the Maintenance of Epidermal Regenerationof Caspase-8 in the Maintenance of Epidermal Regeneration

  14. Network-Level Reliability-Based Bridge Inspection, Maintenance and Replacement Optimization Model

    E-Print Network [OSTI]

    Robelin, Charles-Antoine; Madanat, S M

    2006-01-01T23:59:59.000Z

    years) Interval between maintenance of type 2 (years) nonenone none Period of blocked maintenance (years) none noneShepard. Pontis: A System for Maintenance Optimization and

  15. Washington State Department of Transportation Bridge Maintenance and Inspection Guidance for Protected Terrestrial Species

    E-Print Network [OSTI]

    Carey, Marion

    2007-01-01T23:59:59.000Z

    impacts from routine maintenance and inspection activities.expanded their Highway Maintenance Environmental Complianceand one specific to maintenance activities. The guidance is

  16. A standardized and safe method of sterile field maintenance during intra-operative horizontal plane fluoroscopy

    E-Print Network [OSTI]

    Kaska, Serge C

    2010-01-01T23:59:59.000Z

    method of sterile field maintenance during intra-operativemethod of sterile field maintenance during intra-operativemethod of sterile field maintenance during intra-operative

  17. Triggers and maintenance of multiple shifts in the state of a natural community

    E-Print Network [OSTI]

    Rassweiler, Andrew; Schmitt, Russell J.; Holbrook, Sally J.

    2010-01-01T23:59:59.000Z

    PAPER Triggers and maintenance of multiple shifts in theseparately on the causes and maintenance of state change canpotentially explaining the maintenance of the new state.

  18. Bone Growth, Maintenance and Loss in the Neolithic Community of Çatalhöyük, Turkey: Preliminary Results

    E-Print Network [OSTI]

    Agarwal, Sabrina; Glencross, Bonnie; Beauchesne, Patrick

    2011-01-01T23:59:59.000Z

    Bone Growth, Maintenance and Loss in the Neolithic CommunityThe examination of bone maintenance and loss is another wellchanging patterns of bone maintenance typically observed in

  19. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    SciTech Connect (OSTI)

    None

    2013-03-01T23:59:59.000Z

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

  20. Maintenance and Operations study for K basins sludge treatment

    SciTech Connect (OSTI)

    WESTRA, A.G.

    1998-11-30T23:59:59.000Z

    This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

  1. ESTIMATING ANNUAL NET PRIMARY PRODUCTIVITY OF THE TALLGRASS PRAIRIE ECOSYSTEM OF THE CENTRAL GREAT PLAINS USING AVHRR NDVI

    E-Print Network [OSTI]

    An, Nan

    2009-01-26T23:59:59.000Z

    annual NPP can be calculated by using the equation: , where is the conversion efficiency; is 24-hour maintenance respiration of leaves and fine roots; is annual growth respiration required to construct leaves, fine roots, new woody tissues...? Determining the optimal AVHRR NDVI composite period????30 Development of the Tallgrass ANPP model?....................................32 Construct the ANPP Greenness Maps and Variation Maps among 19 years?????..???????????????????...34 Conclusion...

  2. Modelling of dependence between critical failure and preventive maintenance

    E-Print Network [OSTI]

    Langseth, Helge

    Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect that the failure can be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

  3. A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS

    E-Print Network [OSTI]

    Langseth, Helge

    . The preventive maintenance (PM) is performed periodically with some fixed period , but PM can also be performed describe the "goodness" of the maintenance crew; their ability to prevent failures by performing thorough is assumed to undergo preventive maintenance (PM), usually at fixed time periods > 0. In addition

  4. Maintenance policy: degradation laws versus Hidden Markov Model availability indicator

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    INTRODUCTION Industrial processes need to be maintained to prevent breakdown. Some years ago, maintenance, logistic... Different kinds of maintenance policy can be applied: preventive or corrective according to manager strategies. In case of preventive maintenance, different strategies should be used like planned

  5. Modelling of dependence between critical failure and preventive maintenance

    E-Print Network [OSTI]

    Langseth, Helge

    Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

  6. `ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES

    E-Print Network [OSTI]

    Boyer, Edmond

    part (McCall, 1963). Then an opportunistic maintenance is any action that combines a preventive`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES E. Levrat, E Vandoeuvre (France) Abstract: Today, a new role for maintenance exists to enhance the eco

  7. Commencement Activities & Facility Maintenance Closures Updated Monday 4/29

    E-Print Network [OSTI]

    von der Heydt, RĂĽdiger

    · Fitness Center & Weight Room equipment cleaning, preventive maintenance, and layout changes #12;Commencement Activities & Facility Maintenance Closures Updated Monday 4/29 Spring Semester Normal Maintenance projects. · The Rec Center will be closed Monday 5/20 ­ Sunday 6/9. · The Rec Center reopens

  8. Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies

    E-Print Network [OSTI]

    Terwilliger, Mark

    Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies ABSTRACT Heavy of minimizing the makespan for a set of preventive maintenance (PM) tasks, requiring single- or multiple approach to the SA approach for this class of PM problems. Subject Area: Preventive Maintenance, Evolution

  9. Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1

    E-Print Network [OSTI]

    Watson, Craig A.

    when the need is discovered, but a good preventive maintenance program will reduce the number. This fact sheet will emphasize corrective and preventive maintenance procedures for ventilation, evaporativeAE26 Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1 D. E

  10. Probabilistic service life prediction and maintenance planning of deteriorating structures

    E-Print Network [OSTI]

    Garavaglia, Elsa

    life prediction of a bridge pier and to the selection of a suitable preventive maintenance scenario. 1 with an aggressive environment, and to eventually plan a process of essential and/or preventive maintenance, some preventive maintenance scenario. 2 RELIABILITY OF DETERIORATING STRUCTURAL SYSTEMS The deterioration

  11. Optimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective

    E-Print Network [OSTI]

    Boyer, Edmond

    . Numerical examples have shown that our model provides a preventive maintenance policy that slows downOptimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective Mariem Zouch, Thomas Yeung / IRCCyN, F-44307 NANTES Cedex, France Keywords: Road deterioration, maintenance optimization, Partially

  12. Optimal Maintenance Scheduling of a Power Plant with Seasonal

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    -Wide Optimization Meeting · Plan preventive maintenance shutdowns ­ Minimize payment for skilled labor ­ Save onlineOptimal Maintenance Scheduling of a Power Plant with Seasonal Electricity Tariffs Pedro M. Castro maintenance team doing shutdowns · Shutdown period mandatory after [ , ] h online · Challenging (hard

  13. IEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind

    E-Print Network [OSTI]

    Ntaimo, Lewis

    from sensors, our research objective is to derive an optimal observation and preventive maintenance TRANSACTIONS ON RELIABILITY 3 ACRONYMS NA no action PM preventive maintenance OB observation CM correctiveIEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind Turbine Systems Under

  14. Single-machine Multiple-recipe Predictive Maintenance , John Hasenbein

    E-Print Network [OSTI]

    Hasenbein, John

    preventative and corrective maintenance costs, holdings costs, and possibly production costs. An optimal policy. In a conventional preventive maintenance policy, it is typically assumed that the decision maker knows only when, conventional preventive maintenance policies are often one of two types: calendar-based or job

  15. Experiment #1 Maintenance of UV/vis Instruments

    E-Print Network [OSTI]

    Nazarenko, Alexander

    considerably worse than it should be. For these reasons, most companies have a preventive maintenance program that might be included in a preventive maintenance program for a UV-visible spectrometer. Your taskExperiment #1 Maintenance of UV/vis Instruments Objectives: 1. Learn how to use different UV

  16. Analysis of Preventive Maintenance in Transactions Based Software Systems

    E-Print Network [OSTI]

    Telek, MiklĂłs

    Analysis of Preventive Maintenance in Transactions Based Software Systems Sachin Garg 1 , Antonio''. However, it incurs some overhead. The necessity to do preventive maintenance not only in general purpose to illustrate the usefulness and applicability of the models. Keywords: Preventive Maintenance, Transactions

  17. A contextual semantic mediator for a distributed cooperative maintenance platform

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A contextual semantic mediator for a distributed cooperative maintenance platform Mohamed-Mechatronic Systems department (AS2M) {hedi.karray, Brigitte.morello, Noureddine.zerhouni}@femto-st.fr Abstract-Platforms expand maintenance systems from centralized systems into e-maintenance platforms integrating various

  18. Know how to maximize maintenance spending

    SciTech Connect (OSTI)

    Carrino, A.J.; Jones, R.B.; Platt, W.E.; Tiffany, E.D. [Solomon Associates (United States)

    2009-07-15T23:59:59.000Z

    Solomon has developed a methodology to determine a large optimum point where availability meets maintenance spending for Powder River Basin (PRB) coal-fired units. Using a database of sufficient size and composition across various operating ranges, Solomon generated an algorithm that predicts the relationship between maintenance spending and availability. Coupling this generalized algorithm with a unit-specific market-loss curve determines the optimum spending for a facility. The article presents the results of the analysis, how this methodology can be applied to develop optimum operating and financial targets for specific units and markets and a process to achieve those targets. It also describes how this methodology can be used for other types of fossil-fired technologies and future enhancements to the analysis. 5 figs.

  19. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  20. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

  1. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13T23:59:59.000Z

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  2. Effects of dairy intake on weight maintenance

    E-Print Network [OSTI]

    Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

    2008-10-24T23:59:59.000Z

    . However, weight maintenance following successful weight loss is a critical component to the successful management of obesity, and although there are animal data to support the concept of calcium and dairy attenuation of weight and fat regain [23... or components of body composition. The premise of this investigation was that correction of dietary calcium and dairy insufficiency may attenuate weight regain following successful weight loss. Accord- ingly, it was important to have a clear comparison of inad...

  3. Onsite Wastewater Treatment Systems: Operation and Maintenance

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2008-10-23T23:59:59.000Z

    Soil absorption fieldTwo-compartment septic tank Perforated pipe for effluent disposal Sand/loam soil Gravel Geotextile fabric Onsite wastewater treatment systems Operation and maintenance L-5347 8-08 Figure 1: A septic tank and soil absorption... field system. I f your home or business uses an onsite wastewater treatment system, common- ly known as a septic system, you need to know how to operate and maintain the system properly to prevent pollution and sewage backups. For many years, people...

  4. Preventive maintenance vital to cogen profitability

    SciTech Connect (OSTI)

    Cox, D.R. (Mission Operation and Maintenance Inc. (US))

    1992-04-01T23:59:59.000Z

    A power plant's efficiency is the key to its success in generating a profit. While the fuel used and the mechanical efficiency of the plant itself are key design factor, once the plat is on-stream the main factor becomes the plant's time on line. Any downtime detracts from its profitability, especially during peak periods. In the case of a cogeneration facility downtime becomes even more critical, since it has more than one customer to satisfy; and electrical customer and a thermal energy customer. This paper reports that an unscheduled outage has the potential to be very expensive: Costs and revenue losses escalate rapidly from thousands of dollars into millions of dollars, depending on length of downtime and time of year. During off-peak winter months, losses at the Harbor cogeneration plant can be dramatic; peak summer losses can be catastrophic. Not only are generation revenues loss, but bonus revenues, qualifying facility (QF) status, and contractual obligations are at risk. With these prospects looming over the option, management must practice not only preventive maintenance, but predictive and condition based maintenance as well. HCC's key to preventing unscheduled outages is a computerized maintenance management system (CMMS).

  5. Petroleum Marketing Annual 2009

    U.S. Energy Information Administration (EIA) Indexed Site

    the 2010 data. Petroleum Marketing Annual --- Full report in PDF (1.2 MB) Summary Statistics Summary Statistics Tables PDF 1 Crude Oil Prices PDF TXT 1A Refiner Acquisition Cost...

  6. JAHRESBERICHT ANNUAL REPORT07

    E-Print Network [OSTI]

    Falge, Eva

    JAHRESBERICHT ANNUAL REPORT07 #12;Forschungsausblick Klaus J. Hopt über Corporate Governance Ferdi Schüth über zukünftige Energiesysteme Axel Ullrich über innovative Krebsmedikamente Research Outlook Klaus J. Hopt about Corporate Governance Ferdi Schüth about Future Energy Systems Axel Ullrich about New

  7. 2010 Annual Report

    SciTech Connect (OSTI)

    none,

    2010-01-01T23:59:59.000Z

    This annual report includes: an overview of Western; approaches for future hydropower and transmission service; major achievements in FY 2010; FY 2010 customer Integrated Resource Planning, or IRP, survey; and financial data.

  8. AFN Annual Convention

    Broader source: Energy.gov [DOE]

    The Alaska Federation of Natives (AFN) Convention is the largest representative annual gathering in the United States of any Native peoples. Delegates are elected on a population formula of one...

  9. Annual Energy Outlook 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mayer Brown Annual Global Energy Conference May 15, 2014 | Houston, TX By Adam Sieminski, EIA Administrator The U.S. has experienced a rapid increase in natural gas and oil...

  10. Annual Energy Outlook 2012

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    5 U.S. Energy Information Administration | Annual Energy Outlook 2012 Regional maps Figure F4. Oil and gas supply model regions Figure F4. Oil and Gas Supply Model Regions Atlantic...

  11. 2009 Annual Report

    SciTech Connect (OSTI)

    none,

    2009-01-01T23:59:59.000Z

    This annual report includes: a brief overview of Western; some of our major achievements in FY 2009; FY 2009 customer Integrated Resource Planning, or IRP, survey; and financial data.

  12. BCP Annual Rate Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2015 BCP Annual Rate Process (FY 2016 Base Charge & Rate) Informal Process Rate Activity Schedule (doc) Informal Customer Meeting Thursday March 11, 2015 at 10:30 A.M. Conf Rms 3&4...

  13. Natural gas annual 1995

    SciTech Connect (OSTI)

    NONE

    1996-11-01T23:59:59.000Z

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. The 1995 data are presented in a sequence that follows natural gas (including supplemental supplies) from its production to its end use. This is followed by tables summarizing natural gas supply and disposition from 1991 to 1995 for each Census Division and each State. Annual historical data are shown at the national level.

  14. Natural gas annual 1994

    SciTech Connect (OSTI)

    NONE

    1995-11-17T23:59:59.000Z

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. The 1994 data are presented in a sequence that follows natural gas (including supplemental supplies) from its production to its end use. This is followed by tables summarizing natural gas supply and disposition from 1990 to 1994 for each Census Division and each State. Annual historical data are shown at the national level.

  15. Waste Sampling and Characterization Facility (WSCF). Maintenance Implementation Plan

    SciTech Connect (OSTI)

    Bozich, J.L.

    1993-07-01T23:59:59.000Z

    This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.

  16. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01T23:59:59.000Z

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  17. Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid-Linear Model, Expert Opinion, Complexity Reduction, Maintenance. 1 Introduction Preventive maintenance became essential. Preventive maintenance of a system is taking into account expert knowledge, feedback

  18. Condition-based maintenance under an imperfect repair policy for a deteriorating production system

    E-Print Network [OSTI]

    Boyer, Edmond

    is periodically monitored. Imperfect preventive maintenance activities, which restore the production system policy, both linear and non-linear imperfect preventive maintenance cost functions are investigated preventive maintenance (or preventive replacement) is usually used. After each preventive maintenance action

  19. Maintenance decision making tool reaching a compromise between maintainability and reliability performances

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    or scheduled preventive maintenance) to condition-based or predictive maintenance strategies preventive maintenance actions, in the sense that planned production stoppages within this temporal horizonMaintenance decision making tool reaching a compromise between maintainability and reliability

  20. Organizational Factors Impacting Implementation of Culturally Competent Care Modules in a Large Health Maintenance Organization

    E-Print Network [OSTI]

    Koh, Karen Leanne

    2011-01-01T23:59:59.000Z

    Modules in a Large Health Maintenance Organization By KarenModules in a Large Health Maintenance Organization Copyright

  1. Proactive maintenance initiatives at Argonne National Laboratory-West

    SciTech Connect (OSTI)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-06-01T23:59:59.000Z

    In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

  2. Fiscal Year 2009 Annual Report for Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater

    SciTech Connect (OSTI)

    Forsythe, Howard S.

    2010-04-10T23:59:59.000Z

    This annual report summarizes maintenance, monitoring, and inspection activities performed to implement the selected remedy for Waste Area Group 3, Operable Unit 3-14, Tank Farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Results from monitoring perched water and groundwater at the Idaho Nuclear Technology and Engineering Center are also presented.

  3. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15T23:59:59.000Z

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  4. Plant maintenance and advanced reactors, 2006

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2006-09-15T23:59:59.000Z

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Advanced plants to meet rising expectations, by John Cleveland, International Atomic Energy Agency, Vienna; A flexible and economic small reactor, by Mario D. Carelli and Bojan Petrovic, Westinghouse Electric Company; A simple and passively safe reactor, by Yury N. Kuznetsov, Research and Development Institute of Power Engineering (NIKIET), Russia; Gas-cooled reactors, by Jeffrey S. Merrifield, U.S. Nuclear Regulatory Commission; ISI project managment in the PRC, by Chen Chanbing, RINPO, China; and, Fort Calhoun refurbishment, by Sudesh Cambhir, Omaha Public Power District.

  5. CRAD, Maintenance Assessment Plan | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO OverviewAttachments EnergyFebruary 29CNG Exports by Truck out ofMaintenance Assessment Plan

  6. Kalispel Resident Fish Project : Tribal Hatchery Operations and Maintenance Annual Report, 2002.

    SciTech Connect (OSTI)

    Nenema, David

    2003-03-01T23:59:59.000Z

    The Kalispel Tribal hatchery successfully spawned largemouth bass broodfish in spring 2002. Approximately 150,000 eggs were produced and hatched. These fry were started on brine shrimp for a period of ten days. At this time, the fry needed more abundance food supply. Cannibalism started and the hatchery staff transferred the remaining fry to the river in hopes that some fish would survive.

  7. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 1999 Annual Report.

    SciTech Connect (OSTI)

    Bluff, Stanley

    2000-12-01T23:59:59.000Z

    In October of 1997, The construction of the Kalispel Tribal Hatchery was complete. No spawning activity was recorded for the spring of 1998. On June 14, 1999 the first spawn at the Kalispel Tribal Hatchery was successful. A total of seven nests were fertilized that produced approximately 144,000 fry. The second spawn occurred on July 13, 1999 and a total of six nests were fertilized producing approximately 98,0000 fry. The total amount of largemouth bass fry produced at the Kalispel Tribal Hatchery was 242,000.

  8. NATIONAL CENTRE FOR BIOLOGICAL SCIENCES Annual Maintenance Contract for Electrical Systems in

    E-Print Network [OSTI]

    Udgaonkar, Jayant B.

    substations in NCBS Campus, GKVK Bangalore. 2. ESTIMATE VALUE PUT TO TENDER : Rs.62.29 Lakhs 3. EARNEST MONEY DEPOSIT : Rs.1,24,582.00 4. COST OF TENDER DOCUMENT : Rs. 500/- 5. SALE PERIOD : 12/12/2013 TO 20:________________DATE:____________ __________________________________ FOR A SUM OF RS. ________________ TOWARDS __________________________________THE COST OF TENDER DOCUMENT

  9. AN INNOVATIVE AND ELEGANTLY SIMPLE WAY TO DO SOMETHING FOR BLUEBIRDS (AND TAKE LITTLE TIME AWAY FROM TRANSPORTATION MAINTENANCE DUTIES)

    E-Print Network [OSTI]

    Kahn, Amy; Wicks, Jim Wicks

    2006-01-01T23:59:59.000Z

    FROM TRANSPORTATION MAINTENANCE DUTIES) Jim Wicks, Ontarioand are maintained by the maintenance sign crew with minimal

  10. Stephen Bolt Adam Davis

    E-Print Network [OSTI]

    Bowen, James D.

    technology #12;Nuclear History 1957 ­ First commercial nuclear power plant comes online 1974 - The first 1,000-Megawatt nuclear plant went into service 1979 - Equipment malfunctions at Three Mile Island Nuclear Plant 1986 ­ Chernobyl disaster 1996 - Watts Bar Unit 1 in Tennessee is the last nuclear power plant to come

  11. Bolt Manufacture: Process Selection

    E-Print Network [OSTI]

    Colton, Jonathan S.

    file · Selective Laser Sintering (SLS) 3 D P i ti· 3-D Printing · Light Engineered Net Shaping (LENS Processes and Systems Prof. J.S. Colton © GIT 2009 20 #12;3D Printing Process (Soligen) ME 6222: Manufacturing Processes and Systems Prof. J.S. Colton © GIT 2009 21 #12;3D Printing Head (Soligen)3D Printing

  12. Tamper indicating bolt

    DOE Patents [OSTI]

    Blagin, Sergei V.; Barkanov, Boris P.

    2004-09-14T23:59:59.000Z

    A tamper-indicating fastener has a cylindrical body with threads extending from one end along a portion of the body, and a tamper indicating having a transducer for converting physical properties of the body into electronic data; electronics for recording the electronic data; and means for communicating the recorded information to a remote location from said fastener. The electronics includes a capacitor that varies as a function of force applied by the fastener, and non-volatile memory for recording instances when the capacitance varies, providing an indication of unauthorized access.

  13. Annual Report GreenTouch 20102011 Annual Report

    E-Print Network [OSTI]

    Lefčvre, Laurent

    2010­2011 Annual Report #12;1 GreenTouch 2010­2011 Annual Report Contents Chairman's Letter............................................................ 30 Service Energy Aware Sustainable Optical Networks (SEASON............................................................................................ 43 Beyond Cellular Green Generation (BCG2

  14. Annual Performance Report FY 2004 Annual Performance Plan FY...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOEIG-APP-007 Annual Performance Report FY 2004 Annual Performance Plan FY 2005, DOEIG-APP-007 I am pleased to present the Office of Inspector General's (OIG's) combined...

  15. Annual Site EnvironmentalAnnual Site Environmental ReportReport

    E-Print Network [OSTI]

    ) .................................................8 3.1.3 National Environmental Policy Act (NEPA#12;Annual Site EnvironmentalAnnual Site Environmental ReportReport for Calendar Year1997 ENVIRONMENTAL REPORT Table of Contents Page 1.0 EXECUTIVE SUMMARY

  16. Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2011-12-14T23:59:59.000Z

    The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

  17. Surface Magnetic Flux Maintenance In Quiet Sun

    E-Print Network [OSTI]

    Y. Iida

    2012-12-27T23:59:59.000Z

    We investigate surface processes of magnetic patches, namely merging, splitting, emergence, and cancellation, by using an auto-detection technique. We find that merging and splitting are locally predominant in the surface level, while the frequencies of the other two are less by one or two orders of magnitude. The frequency dependences on flux con- tent of surface processes are further investigated. Based on these observations, we discuss a possible whole picture of the maintenance. Our conclusion is that the photospheric magnetic field structure, especially its power-law nature, is maintained by the processes locally in the surface not by the interactions between different altitudes. We suggest a scenario of the flux maintenance as follows: The splitting and merging play a crucial role for the generation of the power-law distribution, not the emergence nor cancellation do. This power-law distribution results in another power-law one of the cancellation with an idea of the random convective transport. The cancellation and emergence have a common value for the power-law indices in their frequency distributions, which may suggest a "recycle of fluxes by submergence and re-emergence".

  18. A cask maintenance facility feasibility study

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1989-01-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

  19. TRUPACT-II Operating and Maintenance Instructions

    SciTech Connect (OSTI)

    Westinghouse Electric Corporation, Waste Isolation Division

    1999-12-31T23:59:59.000Z

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

  20. Natural gas annual 1997

    SciTech Connect (OSTI)

    NONE

    1998-10-01T23:59:59.000Z

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. The 1997 data are presented in a sequence that follows natural gas (including supplemental supplies) from its production to its end use. This is followed by tables summarizing natural gas supply and disposition from 1993 to 1997 for each Census Division and each State. Annual historical data are shown at the national level. 27 figs., 109 tabs.

  1. International energy annual 1996

    SciTech Connect (OSTI)

    NONE

    1998-02-01T23:59:59.000Z

    The International Energy Annual presents an overview of key international energy trends for production, consumption, imports, and exports of primary energy commodities in over 220 countries, dependencies, and areas of special sovereignty. Also included are population and gross domestic product data, as well as prices for crude oil and petroleum products in selected countries. Renewable energy reported in the International Energy Annual includes hydroelectric power, geothermal, solar, and wind electric power, biofuels energy for the US, and biofuels electric power for Brazil. New in the 1996 edition are estimates of carbon dioxide emissions from the consumption of petroleum and coal, and the consumption and flaring of natural gas. 72 tabs.

  2. Annual Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternative FuelsSanta3 Table 3.EnergyAug412 ArchiveAnnualAnnual2013

  3. ANNUAL SECURITY FIRE SAFETY REPORT

    E-Print Network [OSTI]

    ANNUAL SECURITY AND FIRE SAFETY REPORT OCTOBER 1, 2013 DARTMOUTH COLLEGE http://www.dartmouth.edu/~security/ #12;1 Table of Contents MESSAGE FROM THE DIRECTOR OF SAFETY AND SECURITY................................................................................................................................................................... 7 ANNUAL SECURITY REPORT

  4. 2011 Quality Council Annual Report

    Broader source: Energy.gov [DOE]

    DEPARTMENT OF ENERGY QUALITY COUNCIL ANNUAL REPORT For Calendar Year 2011 Office of Health Safety and Security

  5. NCAI 71st Annual Convention

    Broader source: Energy.gov [DOE]

    Save the date for the National Congress of American Indians (NCAI) 71st Annual Convention at the Hyatt Regency Atlanta.

  6. analyzing maintenance strategies: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    utilisation and non-strategic importance of approximately 80% of the whole inventory the preventive maintenance service will be reduced to a minimum. In order to convert this...

  7. Article Published on LED Lumen Maintenance and Light Loss Factors...

    Broader source: Energy.gov (indexed) [DOE]

    of a comprehensive lifetime rating - as well as the problematic relationship between SSL lifetime and lumen maintenance - determining an appropriate LLD factor for LED products...

  8. Fermilab | Director's Policy Manual | No. 5.000 Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will include a budget and schedule, and a mechanism for tracking equipment failure. A program for preventive and predictive maintenance should also be developed if appropriate...

  9. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance...

  10. Postdoctoral Research Awards Annual Research Meeting: Joseph...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Joseph Mondloch Postdoctoral Research Awards Annual Research Meeting: Joseph Mondloch Postdoctoral Research Awards Annual Research Meeting: Joseph Mondloch poster presentation....

  11. AnnualReport Franz Graf

    E-Print Network [OSTI]

    Middeldorp, Aart

    2011 AnnualReport #12;Franz Graf Cover design adapted from "76543210" Graphite and India ink with symbolic representations of CoSMIC DIMEnSIonS. [...] And yet the sequences of lines are laced Schmidt (excerpts) Ornament, symbol, reversed writing, shadow lines #12;#12;AnnuAl RepoRt 2011 Annual

  12. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Annual Report 1997 #12;Data Management Group Annual Report 1997 A co-operative project that is jointly funded by members of the Toronto Area Transportation Planning Data Collection: (416) 978-3941 #12;Data Management Group 1997 Annual Report Table of Contents 1 INTRODUCTION

  13. 2012ANNUAL REPORT AND ACCOUNTS

    E-Print Network [OSTI]

    Birmingham, University of

    and Estimation Techniques 21 Consolidated Income and Expenditure Account 25 Balance Sheets 26 Consolidated Cash Flow Statement 28 Consolidated Statement of Total Recognised Gains and Losses 29 Notes to the Accounts2011 2012ANNUAL REPORT AND ACCOUNTS #12;Annual Report and Accounts 2011/12 32 Annual Report

  14. University Library Annual Report

    E-Print Network [OSTI]

    Brierley, Andrew

    and a recognition of the need to provide zones within the building for different types of library user behaviourUniversity Library Annual Report 2011-2012 #12;Academic Year 2011-12 brought with it another period of turbulent change ­ most of it positive ­ for the University Library. The major and very tangible difference

  15. International Energy Annual, 1992

    SciTech Connect (OSTI)

    Not Available

    1994-01-14T23:59:59.000Z

    This report is prepared annually and presents the latest information and trends on world energy production and consumption for petroleum, natural gas, coal, and electricity. Trade and reserves are shown for petroleum, natural gas, and coal. Prices are included for selected petroleum products. Production and consumption data are reported in standard units as well as British thermal units (Btu) and joules.

  16. Annual Report and Accounts

    E-Print Network [OSTI]

    ;#12;Forest Research Annual Report and Accounts 2010­2011 Presented to the House of Commons pursuant to Section 7 of The Government Resources and Accounts Act 2000 Ordered by the House of Commons to be printed ...................................................... 12 Centre for Human and Ecological Sciences

  17. NERSC Annual Report 2005

    SciTech Connect (OSTI)

    Hules (Ed.), John

    2006-07-31T23:59:59.000Z

    The National Energy Research Scientific Computing Center (NERSC) is the premier computational resource for scientific research funded by the DOE Office of Science. The Annual Report includes summaries of recent significant and representative computational science projects conducted on NERSC systems as well as information about NERSC's current and planned systems and services.

  18. Annual Report Competence Center

    E-Print Network [OSTI]

    Sandoghdar, Vahid

    : Fröhlich Druck AG www.froehlich.ch 4 #12;Contents 1 About C4 7 2 The Year in Review 9 3 The C4 Network;2 The Year in Review About this C4 Annual Report Over the past two decades, the C4 Network has grown

  19. 2008 annual report Chapterhead

    E-Print Network [OSTI]

    Weston, Ken

    -mail hedick@magnet.fsu.edu. Chapter 1 2008 Year in review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 194 researChhighlights #12;2008 annual report CHapter 1 3 2008-Yearinreview Chapter 1: 2008 - Year in review all user programs and magnets operated throughout 2008! that is really saying something, because

  20. NERSC Annual Report 2002

    SciTech Connect (OSTI)

    Hules, John

    2003-01-31T23:59:59.000Z

    The National Energy Research Scientific Computing Center (NERSC) is the primary computational resource for scientific research funded by the DOE Office of Science. The Annual Report for FY2002 includes a summary of recent computational science conducted on NERSC systems (with abstracts of significant and representative projects), and information about NERSC's current and planned systems and service

  1. ANNUAL REPORT 2011 OFFICEOFSPONSOREDPROJECTS

    E-Print Network [OSTI]

    Karonis, Nicholas T.

    Projects presents the Fiscal Year 2011 Annual Report on external funding at Northern Illinois University where the University experienced a significant increase in funding due to both the continued to comprehensively account for external funding for the university's core mission activities, this year's report also

  2. TRANSPORTATION Annual Report

    E-Print Network [OSTI]

    Minnesota, University of

    2003 CENTER FOR TRANSPORTATION STUDIES Annual Report #12;Center for Transportation Studies University of Minnesota 200 Transportation and Safety Building 511 Washington Avenue S.E. Minneapolis, MN publication is a report of transportation research, education, and outreach activities for the period July

  3. Guaranteed annual wages

    E-Print Network [OSTI]

    Weber, Donald Albert

    1957-01-01T23:59:59.000Z

    in the world, wms in a serious soon omio slump in 1937? At, that time, U? S? Steel had 260, %R employees on 17 7'guaranteed Annual Wag~ill It Workt?" ~Sio ~S +~s i , Narch 2, 1955, Vol. 66, No. 5, p, 7, 5? 6. 70 its payrolls If the company would have...

  4. Uranium industry annual 1998

    SciTech Connect (OSTI)

    NONE

    1999-04-22T23:59:59.000Z

    The Uranium Industry Annual 1998 (UIA 1998) provides current statistical data on the US uranium industry`s activities relating to uranium raw materials and uranium marketing. It contains data for the period 1989 through 2008 as collected on the Form EIA-858, ``Uranium Industry Annual Survey.`` Data provides a comprehensive statistical characterization of the industry`s activities for the survey year and also include some information about industry`s plans and commitments for the near-term future. Data on uranium raw materials activities for 1989 through 1998, including exploration activities and expenditures, EIA-estimated reserves, mine production of uranium, production of uranium concentrate, and industry employment, are presented in Chapter 1. Data on uranium marketing activities for 1994 through 2008, including purchases of uranium and enrichment services, enrichment feed deliveries, uranium fuel assemblies, filled and unfilled market requirements, and uranium inventories, are shown in Chapter 2. The methodology used in the 1998 survey, including data edit and analysis, is described in Appendix A. The methodologies for estimation of resources and reserves are described in Appendix B. A list of respondents to the ``Uranium Industry Annual Survey`` is provided in Appendix C. The Form EIA-858 ``Uranium Industry Annual Survey`` is shown in Appendix D. For the readers convenience, metric versions of selected tables from Chapters 1 and 2 are presented in Appendix E along with the standard conversion factors used. A glossary of technical terms is at the end of the report. 24 figs., 56 tabs.

  5. Annual Energy Outlook 2012

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    A n n u a l E n e r g y Ou t l o o k 2 0 1 2 For further information . . . The Annual Energy Outlook 2012 was prepared by the U.S. Energy Information Administration (EIA), under...

  6. NERSC Annual Report 2004

    SciTech Connect (OSTI)

    Hules, John; Bashor, Jon; Yarris, Lynn; McCullough, Julie; Preuss, Paul; Bethel, Wes

    2005-04-15T23:59:59.000Z

    The National Energy Research Scientific Computing Center (NERSC) is the premier computational resource for scientific research funded by the DOE Office of Science. The Annual Report includes summaries of recent significant and representative computational science projects conducted on NERSC systems as well as information about NERSC's current and planned systems and services.

  7. Trinity College Annual Fund

    E-Print Network [OSTI]

    Lasenby, Joan

    Trinity College Annual Fund 2014 #12;How did Trinity influence your future? By introducing Trinity the Trinity in Cambe programme. Working together, we expect Trin and IntoUniversity to make highe education, the likelihood of getting university and attitudes to learning" Trinity has a long history of nurturing

  8. 2014 Annual AFN Convention

    Broader source: Energy.gov [DOE]

    The AFN Convention is the largest representative annual gathering in the United States of any Native peoples. In addition to the memorable keynote speeches, the expert panels and special reports, the Convention features several evenings of cultural performances known as Quyana Alaska.

  9. Preventative maintenance plan for emergency pumping trailers

    SciTech Connect (OSTI)

    Wiggins, D.D.

    1994-09-01T23:59:59.000Z

    The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ``Single Shell Tank Leak Emergency Pumping Guide.``

  10. Africa's Transport Infrastructure Mainstreaming Maintenance and

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDITCaliforniaWeifangwiki HomeASNAddGlobeJump to:Information

  11. Annual site environmental report for calendar year 1988

    SciTech Connect (OSTI)

    NONE

    1988-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1988 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,376 miles of transmission lines, 254 substations, and various appurtenant power facilities in the above geographic areas. Western also is responsible for planning, construction, and operation and maintenance of additional Federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service areas. Additionally, Western markets the US entitlement from the large Navajo coal-fired plant near Page, Arizona, and power generated at a wind farm in Wyoming. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

  12. Annual site environmental report for calendar year 1991

    SciTech Connect (OSTI)

    NONE

    1991-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,664 miles of transmission lines, 265 substations, and various appurtenant power facilities in fifteen central and western states. Western also is responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

  13. STANDARD OPERATING PROCEDURES Sampler Maintenance by Site Operators

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 201 Sampler Maintenance by Site Operators Date Last.0 PURPOSE AND APPLICABILITY This standard operating procedure (SOP) describes the procedures and schedules. The procedural steps for weekly maintenance and repairs performed by the site operator are included in TI 201A

  14. P\\procedure\\UAVP#20 EMERGENCY BLUE LIGHTS PLACEMENTS & MAINTENANCE

    E-Print Network [OSTI]

    Fernandez, Eduardo

    P\\procedure\\UAVP#20 TITLE: EMERGENCY BLUE LIGHTS ­ PLACEMENTS & MAINTENANCE OBJECTIVE AND PURPOSE: To establish a policy for the installation of new emergency blue lights and the maintenance of existing emergency blue lights. Objective include: Provide adequate emergency blue lights throughout campus. Ensure

  15. Molecular Cell Apollo Contributes to G Overhang Maintenance

    E-Print Network [OSTI]

    de Lange, Titia

    Molecular Cell Article Apollo Contributes to G Overhang Maintenance and Protects Leading to mediate telomere protec- tion. Here we identify the TRF2-interacting factor Apollo as a nuclease that contributes to the genera- tion/maintenance of this overhang. The function of mouse Apollo was determined

  16. Renewable energy annual 1995

    SciTech Connect (OSTI)

    NONE

    1995-12-01T23:59:59.000Z

    The Renewable Energy Annual 1995 is the first in an expected series of annual reports the Energy Information Administration (EIA) intends to publish to provide a comprehensive assessment of renewable energy. This report presents the following information on the history, status, and prospects of renewable energy data: estimates of renewable resources; characterizations of renewable energy technologies; descriptions of industry infrastructures for individual technologies; evaluations of current market status; and assessments of near-term prospects for market growth. An international section is included, as well as two feature articles that discuss issues of importance for renewable energy as a whole. The report also contains a number of technical appendices and a glossary. The renewable energy sources included are biomass (wood), municipal solid waste, biomass-derived liquid fuels, geothermal, wind, and solar and photovoltaic.

  17. International energy annual 1997

    SciTech Connect (OSTI)

    NONE

    1999-04-01T23:59:59.000Z

    The International Energy Annual presents an overview of key international energy trends for production, consumption, imports, and exports of primary energy commodities in over 220 countries, dependencies, and areas of special sovereignty. Also included are population and gross domestic product data, as well as prices for crude oil and petroleum products in selected countries. Renewable energy reported in the International Energy Annual includes hydroelectric power and geothermal, solar, and wind electric power. Also included are biomass electric power for Brazil and the US, and biomass, geothermal, and solar energy produced in the US and not used for electricity generation. This report is published to keep the public and other interested parties fully informed of primary energy supplies on a global basis. The data presented have been largely derived from published sources. The data have been converted to units of measurement and thermal values (Appendices E and F) familiar to the American public. 93 tabs.

  18. Coal industry annual 1997

    SciTech Connect (OSTI)

    NONE

    1998-12-01T23:59:59.000Z

    Coal Industry Annual 1997 provides comprehensive information about US coal production, number of mines, prices, productivity, employment, productive capacity, and recoverable reserves. US Coal production for 1997 and previous years is based on the annual survey EIA-7A, Coal Production Report. This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report includes a national total coal consumption for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. 14 figs., 145 tabs.

  19. Petroleum marketing annual 1994

    SciTech Connect (OSTI)

    NONE

    1995-08-24T23:59:59.000Z

    The Petroleum Marketing Annual (PMA) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysis, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the fob and landed cost of imported crude oil, and the refiners` acquisition cost of crude oil. Refined petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data in the Petroleum Marketing Annual. For this production, all estimates have been recalculated since their earlier publication in the Petroleum Marketing Monthly (PMM). These calculations made use of additional data and corrections that were received after the PMM publication date.

  20. Uranium industry annual 1995

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    The Uranium Industry Annual 1995 (UIA 1995) provides current statistical data on the U.S. uranium industry`s activities relating to uranium raw materials and uranium marketing. The UIA 1995 is prepared for use by the Congress, Federal and State agencies, the uranium and nuclear electric utility industries, and the public. It contains data for the period 1986 through 2005 as collected on the Form EIA-858, ``Uranium Industry Annual Survey``. Data collected on the ``Uranium Industry Annual Survey`` provide a comprehensive statistical characterization of the industry`s plans and commitments for the near-term future. Where aggregate data are presented in the UIA 1995, care has been taken to protect the confidentiality of company-specific information while still conveying accurate and complete statistical data. Data on uranium raw materials activities for 1986 through 1995 including exploration activities and expenditures, EIA-estimated reserves, mine production of uranium, production of uranium concentrate, and industry employment are presented in Chapter 1. Data on uranium marketing activities for 1994 through 2005, including purchases of uranium and enrichment services, enrichment feed deliveries, uranium fuel assemblies, filled and unfilled market requirements, uranium imports and exports, and uranium inventories are shown in Chapter 2. The methodology used in the 1995 survey, including data edit and analysis, is described in Appendix A. The methodologies for estimation of resources and reserves are described in Appendix B. A list of respondents to the ``Uranium Industry Annual Survey`` is provided in Appendix C. For the reader`s convenience, metric versions of selected tables from Chapters 1 and 2 are presented in Appendix D along with the standard conversion factors used. A glossary of technical terms is at the end of the report. 14 figs., 56 tabs.

  1. NERSC 2001 Annual Report

    SciTech Connect (OSTI)

    Hules, John (editor)

    2001-12-12T23:59:59.000Z

    The National Energy Research Scientific Computing Center (NERSC) is the primary computational resource for scientific research funded by the DOE Office of Science. The Annual Report for FY2001 includes a summary of recent computational science conducted on NERSC systems (with abstracts of significant and representative projects); information about NERSC's current systems and services; descriptions of Berkeley Lab's current research and development projects in applied mathematics, computer science, and computational science; and a brief summary of NERSC's Strategic Plan for 2002-2005.

  2. NERSC 1998 annual report

    SciTech Connect (OSTI)

    Hules, John (ed.)

    1999-03-01T23:59:59.000Z

    This 1998 annual report from the National Scientific Energy Research Computing Center (NERSC) presents the year in review of the following categories: Computational Science; Computer Science and Applied Mathematics; and Systems and Services. Also presented are science highlights in the following categories: Basic Energy Sciences; Biological and Environmental Research; Fusion Energy Sciences; High Energy and Nuclear Physics; and Advanced Scientific Computing Research and Other Projects.

  3. NSLS annual report 1984

    SciTech Connect (OSTI)

    Klaffky, R.; Thomlinson, W. (eds.)

    1984-01-01T23:59:59.000Z

    The first comprehensive Annual Report of the National Synchrotron Light Source comes at a time of great activity and forward motion for the facility. In the following pages we outline the management changes that have taken place in the past year, the progress that has been made in the commissioning of the x-ray ring and in the enhanced utilization of the uv ring, together with an extensive discussion of the interesting scientific experiments that have been carried out.

  4. Uranium industry annual 1994

    SciTech Connect (OSTI)

    NONE

    1995-07-05T23:59:59.000Z

    The Uranium Industry Annual 1994 (UIA 1994) provides current statistical data on the US uranium industry`s activities relating to uranium raw materials and uranium marketing during that survey year. The UIA 1994 is prepared for use by the Congress, Federal and State agencies, the uranium and nuclear electric utility industries, and the public. It contains data for the 10-year period 1985 through 1994 as collected on the Form EIA-858, ``Uranium Industry Annual Survey.`` Data collected on the ``Uranium Industry Annual Survey`` (UIAS) provide a comprehensive statistical characterization of the industry`s activities for the survey year and also include some information about industry`s plans and commitments for the near-term future. Where aggregate data are presented in the UIA 1994, care has been taken to protect the confidentiality of company-specific information while still conveying accurate and complete statistical data. A feature article, ``Comparison of Uranium Mill Tailings Reclamation in the United States and Canada,`` is included in the UIA 1994. Data on uranium raw materials activities including exploration activities and expenditures, EIA-estimated resources and reserves, mine production of uranium, production of uranium concentrate, and industry employment are presented in Chapter 1. Data on uranium marketing activities, including purchases of uranium and enrichment services, and uranium inventories, enrichment feed deliveries (actual and projected), and unfilled market requirements are shown in Chapter 2.

  5. annual implementation work: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... 38 Foundations' Support and Financial Information 97 2013 Annual Report | 1 2013 ANNUAL REPORT Mathematics Websites Summary: 2013 Annual Report |...

  6. The Gascon Énonciatif System: Past, Present, and Future. A study of language contact, change, endangerment, and maintenance

    E-Print Network [OSTI]

    Marcus, Nicole

    2010-01-01T23:59:59.000Z

    change, endangerment, and maintenance by Nicole Elise Marcuschange, endangerment, and maintenance by Nicole Elise Marcuschange, endangerment, and maintenance by Nicole Elise Marcus

  7. The Gascon Énonciatif System: Past, Present, and Future, A Study of Language Contact, Change, Endangerment, and Maintenance

    E-Print Network [OSTI]

    Marcus, Nicole

    2010-01-01T23:59:59.000Z

    currently existing language maintenance projects, I am veryto further language maintenance projects, which is anythingis crucial to language maintenance and survival. Many Gascon

  8. Electroencephalography correlates of spatial working memory deficits in attention-deficit/hyperactivity disorder: Vigilance, encoding, and maintenance

    E-Print Network [OSTI]

    2014-01-01T23:59:59.000Z

    CG, Cannon TD (2002) Maintenance and manipulation in spatialVigilance, Encoding, and Maintenance Agatha Lenartowicz, 1,2encoding and maintenance) that may be differentially

  9. Partnership Status, Continued Drug Use and Treatment Adherence among Newly Enrolled Methadone Maintenance Therapy Patients in China

    E-Print Network [OSTI]

    Wan, Dai

    2012-01-01T23:59:59.000Z

    of outpatients in methadone maintenance treatment clinics.of first eight methadone maintenance treatment clinics inLangrod J. , Methadone maintenance treatment (MMT): a review

  10. Facilitators of and Barriers to Methadone Maintenance Treatment Enrollment among Opioid Injecting Drug Users in Hai Phong, Vietnam, 2011

    E-Print Network [OSTI]

    Nguyen, Nguyen Binh

    2012-01-01T23:59:59.000Z

    of methadone maintenance therapy ……………………. ……..….. 1.4. TheBarriers to Methadone Maintenance Enrollment among OpioidUsers and Methadone Maintenance Enrollment in Hai Phong,

  11. Hyphal Development in Candida albicans Requires Two Temporally Linked Changes in Promoter Chromatin for Initiation and Maintenance

    E-Print Network [OSTI]

    Lu, Yang; Su, Chang; Wang, Allen; Liu, Haoping; Heitman, Joseph

    2011-01-01T23:59:59.000Z

    Chromatin for Initiation and Maintenance Yang Lu, Chang Su,cAMP-PKA pathway. Maintenance requires promoter recruitmentof Hda1 for hyphal maintenance happens only during the

  12. Maintenance of Parent Strategies is Associated with Pre-Treatment Parent Fidelity, Treatment Assignment, and Post Treatment Community Services

    E-Print Network [OSTI]

    Fuller, Amy

    2013-01-01T23:59:59.000Z

    California Los Angeles Maintenance of Parent Strategies isOF THE DISSERTATION Maintenance of Parent Strategies isof early interventions, maintenance of taught strategies may

  13. Sustained activation of STAT5 is essential for chromatin remodeling and maintenance of mammary-specific function

    E-Print Network [OSTI]

    Xu, Ren

    2010-01-01T23:59:59.000Z

    Impaired alveologenesis and maintenance of secretory mammaryfor chromatin remodeling and maintenance of mammary-specifictissue architecture in maintenance of transcription factor

  14. Espiritualismo at the U.S.-Mexican Border: A Case Study of Possession, Globalization, and the Maintenance of Tradition

    E-Print Network [OSTI]

    Otero, Rodolfo Alberto

    2010-01-01T23:59:59.000Z

    Globalization, and the Maintenance of Tradition AGlobalization, and the Maintenance of Tradition by Rodolfothe religious movement. The maintenance of equal relations

  15. Activation of Egf-r/ERK by rhomboid signaling regulates the consolidation and maintenance of sleep in Drosophila

    E-Print Network [OSTI]

    Foltenyi, Krisztina

    2006-01-01T23:59:59.000Z

    the consolidation and maintenance of sleep in Drosophila.the consolidation and maintenance of sleep in Drosophila.the consolidation and maintenance of sleep in Drosophila.

  16. Referring heroin users from compulsory detoxification centers to community methadone maintenance treatment: a comparison of three models

    E-Print Network [OSTI]

    2013-01-01T23:59:59.000Z

    to community methadone maintenance treatment: a comparisonefficacy of methadone maintenance interventions in reducingLynch F: Methadone maintenance and the cost and utilization

  17. Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

    SciTech Connect (OSTI)

    Nelson, J. G.; R., L. Morton; Ramirez, C.; Morris, P. S.; McSwain, J. T.

    2011-02-02T23:59:59.000Z

    Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant “looking back” instead of “looking forward.” In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

  18. Maintenance implementation plan for B Plant

    SciTech Connect (OSTI)

    Tritt, S.E.

    1992-06-01T23:59:59.000Z

    The B Plant facility, is located in the 200 East Area at the Hanford Site in south-central Washington State. It consists of two major operating areas: the B Plant Canyon Building, and the Waste Encapsulation and Storage Facility (WESF). The B Plant was originally designed to chemically process spent nuclear fuels. After this initial mission was completed, the plant was modified to provide for the separation of strontium and cesium, individually, from the fission productwaste stream following plutonium and uranium recovery from irradiated reactor fuels in the Plutonium-Uranium Extraction Plant (PUREX). The recovered, purified, and concentrated strontium and cesium solutions were then transferred to the WESF for conversion to solid compounds, encapsulation, and interim storage. After strontium and cesium removal, the remaining waste was transferred from B Plant to tank farms. B Plantis an operating facility that is required to ensure safe storage And management of the WESF cesium and strontium capsules, as well as a substantial radiological inventory remaining in the plant from previous campaigns. There are currently no production activities at B Plant, but several operating systems are required to accomplish the current B Plant mission.B Plant receives and stores various chemicals from commercial suppliers for treatment of low-level waste generated at WESF and B Plant, generation of demineralized water, and conditioning of water used in heating, ventilation, and air conditioning units. This report describes the maintenance of B Plant, including personnel training and schedules.

  19. Factors important for the establishment and maintenance of HIV-1 latency in CD4 T cells

    E-Print Network [OSTI]

    Soto, Paula Campos

    2008-01-01T23:59:59.000Z

    the Establishment and Maintenance of HIV-1 Latency in CD4 TFunction, generation, and maintenance. Annu Rev Immunol. 19.the Establishment and Maintenance of HIV-1 Latency in CD4 T

  20. Maintenance of Open Chromatin States by Histone H3 Eviction and H2A.Z

    E-Print Network [OSTI]

    Lombardi, Laura

    2011-01-01T23:59:59.000Z

    Maintenance of Open Chromatin States by Histone H3 EvictionFischer Spring 2011 Maintenance of Open Chromatin States byMarie Lombardi Abstract Maintenance of Open Chromatin States

  1. Functional Characterization of Kansl2 and Its Role in Mitochondrial DNA Repair and Maintenance

    E-Print Network [OSTI]

    Liau, Wei-Siang

    2012-01-01T23:59:59.000Z

    understanding of the maintenance and repair of the mtDNA,A is necessary for mtDNA maintenance and embryogenesis in1997). Mitochondrial DNA maintenance in vertebrates. Annu

  2. Tradeoffs between time allocations to maintenance activities/travel and discretionary activities/travel

    E-Print Network [OSTI]

    Chen, Cynthia Q; Mokhtarian, Patricia L

    2006-01-01T23:59:59.000Z

    Time Allocations to Maintenance Activities/Travel andShare of Time Spent on Maintenance Activities/Travel (w m )Elasticity of Time Spent on Maintenance Activities, as a

  3. PLZF Regulates Fibroblast Growth Factor Responsiveness and Maintenance of Neural Progenitors

    E-Print Network [OSTI]

    Gaber, ZB; Butler, SJ; Novitch, BG

    2013-01-01T23:59:59.000Z

    and FGFR3 promote NPC maintenance The author(s) have madecharacter and progenitor maintenance in the CNS. Neuron 74:FGFR3 Levels and NPC Maintenance 10. Saarimaki-Vire J,

  4. Maintenance of certification and the financial status of the medical boards

    E-Print Network [OSTI]

    Lieberman, Miriam R.; Siegel, Daniel M.

    2015-01-01T23:59:59.000Z

    H, Phy M, Nugent K. Maintenance of certification in Internalpdf/f990.pdf . ) 7. "ABMS Maintenance of Certification®."ABMS Maintenance of Certification®. N.p. , n.d. Web. (

  5. If your codes run much slower than before the maintenance on...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    codes run much slower after the maintenance on 62514 If your codes hang or run much slower after the maintenance on 62514 June 27, 2014 (0 Comments) During the maintenance on...

  6. An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem very effective solutions for this problem. Key words-- ACO, Production, Preventive maintenance

  7. Predictive maintenance policy for a gradually deteriorating system subject to stress

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of optimal maintenance strategies for improving system availability, preventing Preprint submitted and preventive. Preventive maintenance itself can be categorized into two classes: systematic preventive preventive maintenance policies based on the a priori statistical knowledge of the system lifetime [3]. CBM

  8. Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using a Simulation-Based Approximate

    E-Print Network [OSTI]

    Fernandez, Emmanuel

    Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using Dynamic Programming (ADP) approach for the optimization of Preventive Maintenance (PM) scheduling schedules. I. INTRODUCTION In semiconductor manufacturing systems, or fabs, pre- ventive maintenance (PM

  9. CBM processes are applicable to maintenance activities on complex systems. Southwest Research Institute

    E-Print Network [OSTI]

    Chapman, Clark R.

    performance costs, and preventive/ scheduled maintenance replaces parts before the end of their useful life optimizes costs between preventive and corrective maintenance. Preventive Condition Number of FailuresCBM processes are applicable to maintenance activities on complex systems. Southwest Research

  10. Probabilistic evaluation of the sustainability of maintenance strategies for RC structures exposed to chloride ingress

    E-Print Network [OSTI]

    Boyer, Edmond

    is proposed. Keywords: reinforced concrete, sustainability, corrosion, maintenance, reliability. hal-00796729, to guarantee optimum levels of serviceability and safety during the life-cycle, maintenance planning1 Probabilistic evaluation of the sustainability of maintenance strategies for RC structures

  11. Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field

    E-Print Network [OSTI]

    California at Davis, University of

    Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin Group, Davis, CA, USA 4 Southern California Edison, Irwindale, CA, USA ABSTRACT HVAC maintenance utilities across the nation to include HVAC maintenance measures in energy efficiency programs

  12. CANCER PROGRAM ANNUAL REPORT CANCER PROGRAM

    E-Print Network [OSTI]

    Illinois at Chicago, University of

    CANCER PROGRAM ANNUAL REPORT CANCER PROGRAM 2010 ANNUAL REPORT WITH STATISTICAL DATA FROM 2009 UNIVERSITY OF ILLINOIS MEDICAL CENTER #12;2 CANCER PROGRAM ANNUAL REPORT 2 #12;3 CANCER PROGRAM ANNUAL REPORT 3 UIMC CANCER PROGRAM CHANGING MULTIDISCIPLINARY CARE. FOR GOOD. #12;4 CANCER PROGRAM ANNUAL REPORT

  13. Smart Structures and Materials & Nondestructive Evaluation and Health Monitoring; 17th Annual International symposium, 7-11 March 2010; San Diego, California USA

    E-Print Network [OSTI]

    Oza, Nikunj C.

    Smart Structures and Materials & Nondestructive Evaluation and Health Monitoring; 17th Annual International symposium, 7-11 March 2010; San Diego, California USA Propulsion Health Monitoring Of a Turbine companies in order to increase safety of operation and lower maintenance costs. Health monitoring remains

  14. Historical Natural Gas Annual 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    1999 The Historical Natural Gas Annual contains historical information on supply and disposition of natural gas at the national, regional, and State level as well as prices at...

  15. 2006 Annual Report: Discovering Solutions

    SciTech Connect (OSTI)

    none,

    2006-01-01T23:59:59.000Z

    This annual report includes: a brief overview of Western; FY 2006 highlights; FY 2006 Integrated Resource Planning, or IRP, summary; and financial data.

  16. Tanana Chiefs Conference Annual Convention

    Broader source: Energy.gov [DOE]

    The Tanana Chiefs Conference is holding its annual convention to discuss issues in the region, hold elections, and adopt resolutions presented by Tribes.

  17. Final Report for the Arroyo Las Positas Maintenance Impact Study, Lawrence Livermore National Laboratory

    SciTech Connect (OSTI)

    van Hattem, M; Paterson, L

    2006-01-12T23:59:59.000Z

    In 2000, the Lawrence Livermore National Laboratory's (LLNL) Environmental Protection Department, in coordination with Plant Engineering (PE), began dredging sections of the Arroyo Las Positas (ALP) to alleviate concerns about flooding of sensitive facilities within the mainsite of Lawrence Livermore National Laboratory. In order to reduce potential impacts on the federally threatened California red-legged frog (Rana aurora draytonii), LLNL proposed to dredge sections of the ALP in a ''checkerboard pattern'', resulting in a mosaic of open water habitat and vegetated sections (Figure 1). The Arroyo Las Positas Management Plan (Plan) was coordinated with both state and federal agencies including the U.S. Fish and Wildlife Service (USFWS), California Department of Fish and Game (CDF&G), San Francisco Regional Water Quality Control Board (SFRWQCB), and the Army Corp of Engineers (ACOE). Water Discharge Requirements (WDRs) were issued for this project on December 30, 1999 (Order No. 99-086) by the SFRWQCB. Provision 19 of the WDRs outlined a five-year (2000 through 2004) Maintenance Impact Study (MIS) that LLNL began in coordination with dredging work that was conducted as part of the Arroyo Las Positas Management Plan. Provision 20 of these WDRs requires LLNL to submit a final report of the results of the Maintenance Impact Study for this project to the SFRWQCB. The purpose of this report is to present the results of the Maintenance Impact Study for Arroyo Las Positas and meet the requirements of Provision 20. A description of the annual monitoring included in this Maintenance Impact Study is included in the methods section of this report. Initially the Plan called for dredging the entire length of the Arroyo Las Positas (approximately 6,981 linear feet) over a 5-year period to minimize temporal impacts on the California red-legged frog. Dredging occurred in 2000 ({approx}1,300 ft.), 2001 ({approx}800 ft.), and 2002 ({approx}1,200 ft.), which constituted approximately 3,300 ft., or roughly half of the entire Plan (Figure 2). Logistical challenges and unanticipated cost influenced the decision to terminate the project prior to completion, and re-evaluate the long-term management goals for the ALP. No dredging was conducted in the final two years of the plan (2003 and 2004).

  18. Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project, Mile 6 to Oracle Substation Categorical Exclusion Continuation Sheet Project Description Maintenance work at...

  19. FAciLity mAintenAnce College of Rural and Community Development

    E-Print Network [OSTI]

    Hartman, Chris

    maintenance trends and developing strate- gies for future maintenance needs. Occupational endorsement Program--Troubleshooting HVAC Systems......................................2 CTT F151--Introduction to Plumbing Tools

  20. Renewable energy annual 1996

    SciTech Connect (OSTI)

    NONE

    1997-03-01T23:59:59.000Z

    This report presents summary data on renewable energy consumption, the status of each of the primary renewable technologies, a profile of each of the associated industries, an analysis of topical issues related to renewable energy, and information on renewable energy projects worldwide. It is the second in a series of annual reports on renewable energy. The renewable energy resources included in the report are biomass (wood and ethanol); municipal solid waste, including waste-to-energy and landfill gas; geothermal; wind; and solar energy, including solar thermal and photovoltaic. The report also includes various appendices and a glossary.

  1. NPL 1999 Annual Report

    SciTech Connect (OSTI)

    None

    2000-01-01T23:59:59.000Z

    OAK-B135 NPL 1999 Annual Report. The Nuclear Physics Laboratory at the University of Washington in Seattle pursues a broad program of nuclear physics research. Research activities are conducted locally and at remote sites. The current program includes ''in-house'' research on nuclear collisions using the local tandem Van de Graaff and superconducting linac accelerators as well as local and remote non-accelerator research on fundamental symmetries and weak interactions and user-mode research on relativistic heavy ions at large accelerator facilities around the world.

  2. International energy annual 1995

    SciTech Connect (OSTI)

    NONE

    1996-12-01T23:59:59.000Z

    The International Energy Annual presents information and trends on world energy production and consumption for petroleum, natural gas, coal, and electricity. Production and consumption data are reported in standard units as well as British thermal units (Btu). Trade and reserves are shown for petroleum, natural gas, and coal. Data are provided on crude oil refining capacity and electricity installed capacity by type. Prices are included for selected crude oils and for refined petroleum products in selected countries. Population and Gross Domestic Product data are also provided.

  3. Annual Energy Review 2010

    SciTech Connect (OSTI)

    None

    2011-10-01T23:59:59.000Z

    This twenty-ninth edition of the Annual Energy Review (AER) presents the U.S. Energy Information Administration’s (EIA) most comprehensive look at integrated energy statistics. The summary statistics on the Nation’s energy production, consumption, trade, stocks, and prices cover all major energy commodities and all energy-consuming sectors of the U.S. economy from 1949 through 2010. The AER is EIA’s historical record of energy statistics and, because the coverage spans six decades, the statistics in this report are well-suited to long-term trend analysis.

  4. Annual Coal Report 2013

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline prices4 OilU.S. OffshoreOilAnnual Coal Report

  5. Annual Energy Outlook 2015

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline prices4 OilU.S. OffshoreOilAnnual38 Reference

  6. Annual Reports - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternative FuelsSanta3 Table 3.EnergyAug412 ArchiveAnnual Reports

  7. 2007 TEPP Annual Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2UraniumEnergy CityDepartment ofNuclear| Department7 Annual Plan 2007 U.S.

  8. Annual Report on U

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'s Reply Comments AT&T,FACT SAmesEnergyAnnual PlanningAUGUST 2014

  9. Annual Site Environmental Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'s Reply Comments AT&T,FACT SAmesEnergyAnnual PlanningAUGUST

  10. NERSC Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Saleshttp://www.fnal.gov/directorate/nalcal/nalcal02_07_05_files/nalcal.gif Directorate - Events - FermilabEnergyNERSC Annual

  11. Annual Reports - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMForms About BecomeTechnologiesVehicle PartsAnnual Energy Outlook

  12. ARM - Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearchSOLICITATIONIMODI FICATION OFMaterialsAnnual Reports Publications Journal

  13. 2013 NUFO Annual Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del(ANL-IN-03-032) -Less isNFebruary 2004AugustApril 20133 Audit2013 NUFO Annual

  14. Annual Report 2008.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWP TWPAlumni Alumni PARC/I-CARESAnalysis for NationalTotalAnnualSRS Cold

  15. NERSC Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |IsLove Your1Allocations NERSC Allocations: forNERSC AnnouncesAnnual

  16. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Environmental Management (EM)

    3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that...

  17. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Broader source: Energy.gov (indexed) [DOE]

    transferred to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). Source document citations are presented. Most of these sites meet criteria...

  18. Investigating the maintenance of the mouse definitive adrenal cortex 

    E-Print Network [OSTI]

    Zhao, Xin

    2013-11-29T23:59:59.000Z

    and Cyp11b1 that encode the enzymes aldosterone synthase and 11?-hydroxylase, which catalyze the terminal reactions in the production of aldosterone and corticosterone, respectively. This thesis aims to investigate the maintenance of the definitive mouse...

  19. Method and computer program product for maintenance and modernization backlogging

    DOE Patents [OSTI]

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19T23:59:59.000Z

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  20. Maintenance-based design of concrete parking structures

    E-Print Network [OSTI]

    Stoakes, Christopher D. (Christopher David)

    2007-01-01T23:59:59.000Z

    The purpose of this study is to determine what type of preventative maintenance for a concrete parking structure will produce the maximum economic benefit. Existing models for concrete deterioration are analyzed for their ...

  1. Multi-canister overpack operations and maintenance manual

    SciTech Connect (OSTI)

    PIERCE, S.R.

    1999-06-23T23:59:59.000Z

    This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

  2. Live long and prosper: Germline stem cell maintenance

    E-Print Network [OSTI]

    Extavour, Cassandra

    Live long and prosper: Germline stem cell maintenance revisited (retrospective on DOI: 10.1002/bies aging is rapid or their divisions tend to produce game- togenic daughters, then they may limit animals

  3. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    WCRR Monthly Diesel Generator PM, dated 04082011 WI 06.01 Attachment A, JRF-11-06 Preventive Maintenance Cancellation, dated 4122011 WI 06.01 Attachment A, JRF-11-09...

  4. Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs

    E-Print Network [OSTI]

    Boynton, T.; Dewhirst, B.

    1980-01-01T23:59:59.000Z

    This paper will deal with steam trap surveys and preventive maintenance programs and the energy savings that may be realized from such efforts. Trap survey organization, flexibility, simplicity, and mechanics will be reviewed, including the economic...

  5. Gas Turbine Technology, Part B: Components, Operations and Maintenance 

    E-Print Network [OSTI]

    Meher-Homji, C. B.; Focke, A. B.

    1985-01-01T23:59:59.000Z

    This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative...

  6. Written emotional expression: Effects on weight loss and maintenance

    E-Print Network [OSTI]

    Hockemeyer, Jill Renee

    2007-10-16T23:59:59.000Z

    the negative effects of distress on weight loss and maintenance through improved emotional self-regulatory processes. This study examined the effects of expressive writing on weight regain, stress, and emotional eating among individuals who have recently lost...

  7. activity maintenance study: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for direct the interferometer outside the Earth atmosphere and far from the Earth-Moon enviroment. The orbits around the L2 Barcelona, Universitat de 364 The maintenance of...

  8. Electric power annual 1992

    SciTech Connect (OSTI)

    Not Available

    1994-01-06T23:59:59.000Z

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  9. Annual Energy Review 1993

    SciTech Connect (OSTI)

    Not Available

    1994-07-14T23:59:59.000Z

    This twelfth edition of the Annual Energy Review (AER) presents the Energy Information Administration`s historical energy statistics. For most series, statistics are given for every year from 1949 through 1993. Because coverage spans four and a half decades, the statistics in this report are well-suited to long-term trend analyses. The AER is comprehensive. It covers all major energy activities, including consumption, production, trade, stocks, and prices, for all major energy commodities, including fossil fuels and electricity. The AER also presents Energy Information Administration (EIA) statistics on some renewable energy sources. EIA estimates that its consumption series include about half of the renewable energy used in the United States. For a more complete discussion of EIA`s renewables data, see p. xix, ``Introducing Expanded Coverage of Renewable Energy Data Into the Historical Consumption Series.`` Copies of the 1993 edition of the Annual Energy Review may be obtained by using the order form in the back of this publication. Most of the data in the 1993 edition also are available on personal computer diskette. For more information about the diskettes, see the back of this publication. In addition, the data are available as part of the National Economic, Social, and Environmental Data Bank on a CD-ROM. For more information about the data bank, contact the US Department of Commerce Economics and Statistics Administration, on 202-482-1986.

  10. A Portable Expert System for Gas Turbine Maintenance

    E-Print Network [OSTI]

    Quentin, G. H.

    A PORTABLE EXPERT SYSTEM FOR GAS TURBINE MAINTENANCE Or. George H. Quentin Electric Power Research Institute (EPRI) Palo Alto, California ABSTRACT TURBINE CONTROLS GROUND FAULT ADVISOR Combustion turbines for electric power generation..., EPRI has developed The SA.VANT- System. This unique multi-faceted portable unit will apply a broad range of expert systems in the workplace for power plant maintenance, including turbomachinery of all types, but especially for gas turbines. I...

  11. Maintenance Implementation Plan for B Plant. Revision 1

    SciTech Connect (OSTI)

    Tritt, S.E.

    1993-04-01T23:59:59.000Z

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ``Nuclear Facilities`` (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

  12. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    SciTech Connect (OSTI)

    Meldrom, C.A.

    1996-03-01T23:59:59.000Z

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

  13. Just In-Time Maintenance of Nuclear Power Plants

    SciTech Connect (OSTI)

    DR. Alexander G. Parlos

    2002-01-22T23:59:59.000Z

    The goal of this project has been to develop and demonstrate the feasibility of a new technology for maintenance engineering: a Just-In-Time Maintenance (JITM) system for rotating machines. The JITM system is based on several key developments at Texas A and M over the past ten years in emerging intelligent information technologies, which if integrated into a single system could provide a revolutionary approach in the way maintenance is performed. Rotating machines, such as induction motors, range from a few horse power (hp) to several thousand hp in size, and they are widely used in nuclear power plants and in other industries. Forced outages caused by induction motor failures are the reason for as much as 15% - 40% of production costs to be attributable to maintenance, whereas plant shutdowns caused by induction motor failures result in daily financial losses to the utility and process industries of $1 M or more. The basic components of the JITM system are the available machine sensors, that is electric current sensors and accelerometers, and the computational algorithms used in the analysis and interpretation of the occurring incipient failures. The JITM system can reduce the costs attributable to maintenance by about 40% and it can lower the maintenance budgets of power and process plants by about 35%, while requiring no additional sensor installation. As a result, the JITM system can improve the competitiveness of US nuclear utilities at minimal additional cost.

  14. Social Traditions and the Maintenance and Loss of Geographic Variation in Mating Patterns of Brown-Headed Cowbirds

    E-Print Network [OSTI]

    Freeberg, Todd M.; White, David J.

    2006-01-01T23:59:59.000Z

    Social Traditions and the Maintenance and Loss of Geographiccould play a role in the maintenance of distinct groupings

  15. Eighth Annual Risk Management Conference

    E-Print Network [OSTI]

    Chaudhuri, Sanjay

    Eighth Annual Risk Management Conference Risk Management Amidst Global Rebalancing 10 ­ 11 July 2014, Singapore The Risk Management Institute (RMI) at the National University of Singapore invites submissions for its 8th annual conference on risk management in Singapore on 10 and 11 July 2014. We

  16. ANNUAL SECURITY & FIRE SAFETY REPORT

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    ANNUAL SECURITY & FIRE SAFETY REPORT 2014 A guide to policies, procedures, practices, and programs implemented to keep students, faculty, and staff safe and facilities secure. www.montana.edu/reports/security.pdf #12;Inside this Report 2014 Annual Security and Fire Safety Report for Reporting Year 2013

  17. Annual Energy Outlook Retrospective Review

    Reports and Publications (EIA)

    2015-01-01T23:59:59.000Z

    The Annual Energy Outlook Retrospective Review provides a yearly comparison between realized energy outcomes and the Reference case projections included in previous Annual Energy Outlooks (AEO) beginning with 1982. This edition of the report adds the AEO 2012 projections and updates the historical data to incorporate the latest data revisions.

  18. Technical Insights for Saltstone PA Maintenance

    SciTech Connect (OSTI)

    Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

    2011-07-20T23:59:59.000Z

    The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

  19. EARTH SCIENCES DIVISION ANNUAL REPORT 1978

    E-Print Network [OSTI]

    Authors, Various

    2012-01-01T23:59:59.000Z

    Mexico, 52nd Annual Fall Technical Conference and Exhibition of the SOC. Pet.Mexico. Preprint, 52nd annual meeting cf the SOC. of Pet.

  20. Secretarial Annual Awards Program | Department of Energy

    Energy Savers [EERE]

    Secretarial Annual Awards Program Secretarial Annual Awards Program The DOE Mentor of the Year award recognizes the efforts of a DOE Mentor that has exceeded the...

  1. EIA - Annual Energy Outlook 2014 Early Release

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Energy Outlook 2013 LED Light emitting diode AEO2014 Annual Energy Outlook 2014 LNG Liquefied natural gas ATRA American Taxpayer Relief Act of 2012 LPG Liquefied petroleum...

  2. Geothermal Technologies Program Annual Peer Review Presentation...

    Energy Savers [EERE]

    Technologies Program Annual Peer Review Presentation By Doug Hollett Geothermal Technologies Program Annual Peer Review Presentation By Doug Hollett 2012 Peer Review presentation...

  3. NERSC Announces Third Annual HPC Achievement Awards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computing Center (NERSC) announced the winners of its third annual High Performance Computing (HPC) Achievement Awards on Feb. 24, 2015, during the annual NERSC User...

  4. Presidential Permit Holders - Annual Reports | Department of...

    Energy Savers [EERE]

    Permit Holders - Annual Reports Presidential Permit Holders - Annual Reports Presidential permit holders are responsible for reporting the gross amount electric energy which flows...

  5. Postdoctoral Research Awards Annual Research Meeting: Padmaja...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Padmaja Gunda Postdoctoral Research Awards Annual Research Meeting: Padmaja Gunda Poster Presentation at 2012 EERE Annual Research Meeting, Postdoctoral Research Awards, from the...

  6. Postdoctoral Research Awards Annual Research Meeting: Brandon...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Brandon Mercado Postdoctoral Research Awards Annual Research Meeting: Brandon Mercado Poster Presentation at 2012 EERE Annual Research Meeting, Postdoctoral Research Awards, from...

  7. EIA - Annual Energy Outlook 2011 Early Release

    Gasoline and Diesel Fuel Update (EIA)

    January STEO Annual projections to 2040 International projections All projections reports Analysis & Projections Major Topics Most popular Annual Energy Outlook related...

  8. Kennecott Utah Copper Corporation: Facility Utilizes Energy Assessments to Identify $930,000 in Potential Annual Savings

    SciTech Connect (OSTI)

    Not Available

    2004-07-01T23:59:59.000Z

    Kennecott Utah Copper Corporation (KUCC) used targeted energy assessments in the smelter and refinery at its Bingham Canyon Mine, near Salt Lake City, Utah. The assessment focused mainly on the energy-intensive processes of copper smelting and refining. By implementing the projects identified, KUCC could realize annual cost savings of $930,000 and annual energy savings of 452,000 MMBtu. The projects would also reduce maintenance, repair costs, waste, and environmental emissions. One project would use methane gas from an adjacent municipal dump to replace natural gas currently used to heat the refinery electrolyte.

  9. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    SciTech Connect (OSTI)

    Doyle, E. Kevin [Bruce Power LP, Box 4000B12, Tiverton, Ont., N0G2T0 (Canada)

    2002-07-01T23:59:59.000Z

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at great cost over years of trial and error. The pivotal role of expert opinion via experienced users/problem owners/maintenance engineers in all phases of the method and its application was noted and will be explored in subsequent efforts. The results are displayed via economic alternatives to more easily attract the attention of Maintenance Managers. Graphical overviews of the data demonstrated that substantial insight can be gained by simply organizing the data into statistically meaningful arrays such as histograms. The conclusions highlight several very positive avenues to evaluate at this particular juncture in time. (author)

  10. Annual energy review 1994

    SciTech Connect (OSTI)

    NONE

    1995-07-01T23:59:59.000Z

    This 13th edition presents the Energy Information Administration`s historical energy statistics. For most series, statistics are given for every year from 1949 through 1994; thus, this report is well-suited to long-term trend analyses. It covers all major energy activities, including consumption, production, trade, stocks, and prices for all major energy commodities, including fossil fuels and electricity. Statistics on renewable energy sources are also included: this year, for the first time, usage of renewables by other consumers as well as by electric utilities is included. Also new is a two-part, comprehensive presentation of data on petroleum products supplied by sector for 1949 through 1994. Data from electric utilities and nonutilities are integrated as ``electric power industry`` data; nonutility power gross generation are presented for the first time. One section presents international statistics (for more detail see EIA`s International Energy Annual).

  11. Uranium Industry Annual, 1992

    SciTech Connect (OSTI)

    Not Available

    1993-10-28T23:59:59.000Z

    The Uranium Industry Annual provides current statistical data on the US uranium industry for the Congress, Federal and State agencies, the uranium and electric utility industries, and the public. The feature article, ``Decommissioning of US Conventional Uranium Production Centers,`` is included. Data on uranium raw materials activities including exploration activities and expenditures, resources and reserves, mine production of uranium, production of uranium concentrate, and industry employment are presented in Chapter 1. Data on uranium marketing activities including domestic uranium purchases, commitments by utilities, procurement arrangements, uranium imports under purchase contracts and exports, deliveries to enrichment suppliers, inventories, secondary market activities, utility market requirements, and uranium for sale by domestic suppliers are presented in Chapter 2.

  12. Uranium industry annual 1996

    SciTech Connect (OSTI)

    NONE

    1997-04-01T23:59:59.000Z

    The Uranium Industry Annual 1996 (UIA 1996) provides current statistical data on the US uranium industry`s activities relating to uranium raw materials and uranium marketing. The UIA 1996 is prepared for use by the Congress, Federal and State agencies, the uranium and nuclear electric utility industries, and the public. Data on uranium raw materials activities for 1987 through 1996 including exploration activities and expenditures, EIA-estimated reserves, mine production of uranium, production of uranium concentrate, and industry employment are presented in Chapter 1. Data on uranium marketing activities for 1994 through 2006, including purchases of uranium and enrichment services, enrichment feed deliveries, uranium fuel assemblies, filled and unfilled market requirements, uranium imports and exports, and uranium inventories are shown in Chapter 2. A feature article, The Role of Thorium in Nuclear Energy, is included. 24 figs., 56 tabs.

  13. Coal industry annual 1993

    SciTech Connect (OSTI)

    Not Available

    1994-12-06T23:59:59.000Z

    Coal Industry Annual 1993 replaces the publication Coal Production (DOE/FIA-0125). This report presents additional tables and expanded versions of tables previously presented in Coal Production, including production, number of mines, Productivity, employment, productive capacity, and recoverable reserves. This report also presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for a wide audience including the Congress, Federal and State agencies, the coal industry, and the general public. In addition, Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility Power Producers who are not in the manufacturing, agriculture, mining, construction, or commercial sectors. This consumption is estimated to be 5 million short tons in 1993.

  14. 1994 MCAP annual report

    SciTech Connect (OSTI)

    Harmony, S.C.; Boyack, B.E.

    1995-04-01T23:59:59.000Z

    VELCOR is an integrated, engineering-level computer code that models the progression of severe accidents in light water reactor (LWR) nuclear power plants. The entire spectrum of severe accident phenomena, including reactor coolant system and containment thermal-hydraulic response, core heatup, degradation and relocation, and fission product release and transport is treated in MELCOR in a unified framework for both boiling water reactors (BWRs) and pressurized water reactors (PWRs). Its current uses include the estimation of severe accident source terms and their sensitivities and uncertainties in a variety of applications. Independent assessment efforts have been successfully completed by the US and international MELCOR user communities. Most of these independent assessment efforts have been conducted to support the needs and fulfill the requirements of the individual user organizations. The resources required to perform an extensive set of model and integral code assessments are large. A prudent approach to fostering code development and maturation is to coordinate the individual assessment efforts of the MELCOR user community. While retaining individual control over assessment resources, each organization using the MELCOR code could work with the other users to broaden assessment coverage and minimize duplication. In recognition of these considerations, the US Nuclear Regulatory Commission (US NRC) has initiated the MELCOR Cooperative Assessment Program (MCAP), a vehicle for coordinating and standardizing the assessment practices of the various MELCOR users. In addition, the user community will have a forum to better communicate lessons learned regarding MELCOR applications, capabilities, and user guidelines and limitations and to provide a user community perspective on code development needs and priorities. This second Annual Report builds on the foundation laid with the first Annual Report.

  15. Home Maintenance and Repair Owning a home is a major responsibility.

    E-Print Network [OSTI]

    maintenance is conducted. Regular, preventive maintenance can pay off in peace of mind, utility cost savings, routine maintenance helps to prolong the life of the home and may prevent the need for major repairs of Benjamin Franklin, "An ounce of prevention is worth a pound of cure." Regular, routine maintenance enhances

  16. Single-machine scheduling with periodic and exible periodic maintenance to minimize maximum tardiness

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    periods often appear in industry due to a machine breakdown (stochastic) or preventive maintenance of machine unavailability. However, in some cases (e.g. preventive maintenance), the maintenance of a machineSingle-machine scheduling with periodic and exible periodic maintenance to minimize maximum

  17. DYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    . There are mainly two types of maintenance activities: the preventive maintenance, whose activities can be long termDYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni good performance with production means. Especially in maintenance services field where the different

  18. Analysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H.

    E-Print Network [OSTI]

    Langseth, Helge

    maintenance interval , and the critical failure rate given that no preventive maintenance is performed (asAnalysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H. SINTEF". The suggested modelling provides means to predict how maintenance tasks will affect the rate of critical

  19. Designing an on-line multimedia maintenance manual for a production environment

    E-Print Network [OSTI]

    Brinkman, Willem-Paul

    ). It is a combination of design-out maintenance (DOM) and preventive maintenance. The focus of DOM is to improve36 Designing an on-line multimedia maintenance manual for a production environment W.P. Brinkman, V.P. Buil, R. Cullen1 , R. Gobits2 and F.L. van Nes e-mail: w.p.brinkman@tue.nl Abstract Maintenance

  20. Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b,

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b, , Sandra Preventive maintenance a b s t r a c t Today, many industrial companies must face problems raised to make predictive maintenance to prevent a serious breakdown. In addition, the corrective maintenance