  1. Ancillary Service Revenue Potential for Geothermal Generators...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ancillary Service Revenue Potential for Geothermal Generators in California Ancillary Service Revenue Potential for Geothermal Generators in California PDF icon Ancillary Service...

  2. Ancillary Services Provided from DER

    SciTech Connect (OSTI)

    Campbell, J.B.

    2005-12-21

    Distributed energy resources (DER) are quickly making their way to industry primarily as backup generation. They are effective at starting and then producing full-load power within a few seconds. The distribution system is aging and transmission system development has not kept up with the growth in load and generation. The nation's transmission system is stressed with heavy power flows over long distances, and many areas are experiencing problems in providing the power quality needed to satisfy customers. Thus, a new market for DER is beginning to emerge. DER can alleviate the burden on the distribution system by providing ancillary services while providing a cost adjustment for the DER owner. This report describes 10 types of ancillary services that distributed generation (DG) can provide to the distribution system. Of these 10 services the feasibility, control strategy, effectiveness, and cost benefits are all analyzed as in the context of a future utility-power market. In this market, services will be provided at a local level that will benefit the customer, the distribution utility, and the transmission company.

  3. Demand Response for Ancillary Services

    SciTech Connect (OSTI)

    Alkadi, Nasr E; Starke, Michael R

    2013-01-01

    Many demand response resources are technically capable of providing ancillary services. In some cases, they can provide superior response to generators, as the curtailment of load is typically much faster than ramping thermal and hydropower plants. Analysis and quantification of demand response resources providing ancillary services is necessary to understand the resources economic value and impact on the power system. Methodologies used to study grid integration of variable generation can be adapted to the study of demand response. In the present work, we describe and illustrate a methodology to construct detailed temporal and spatial representations of the demand response resource and to examine how to incorporate those resources into power system models. In addition, the paper outlines ways to evaluate barriers to implementation. We demonstrate how the combination of these three analyses can be used to translate the technical potential for demand response providing ancillary services into a realizable potential.

  4. Demand Response for Ancillary Services

    Broader source: Energy.gov [DOE]

    Methodologies used to study grid integration of variable generation can be adapted to the study of demand response. In the present work, we describe and implement a methodology to construct detailed temporal and spatial representations of demand response resources and to incorporate those resources into power system models. In addition, the paper outlines ways to evaluate barriers to implementation. We demonstrate how the combination of these three analyses can be used to assess economic value of the realizable potential of demand response for ancillary services.

  5. Load Participation in Ancillary Services Workshop Report

    SciTech Connect (OSTI)

    Kirby, Brendan; O'Malley, Mark; Ma, Ookie; Cappers, Peter; Corbus, Dave; Kiliccote, Sila; Onar, Omer; Starke, Michael; Steinberg, Dan

    2011-10-25

    Developing load participation in ancillary services to the electric grid. Challenges: coordination among multiple entities, targeted R&D for market conditions and regulatory and policy environments.

  6. ENERNOC Load Participation in Ancillary Services

    SciTech Connect (OSTI)

    Breidenbaugh, Aaron

    2011-10-25

    Report on EnerNOC. Description of their demand response for ancillary services in wholesale markets, bilateral programs, and lessons learned. NYISO experience.

  7. Load Participation in Ancillary Services System from An Operator Perspective

    SciTech Connect (OSTI)

    Kujawski, Don; Petri, Mark C.

    2011-10-25

    Ancillary services as defined by FERC (Order 888) distinguished by response time, duration, frequency. Met when DR has capability to balance supply and demand; and LMP payment to DR is cost effective.

  8. Loads Providing Ancillary Services: Review of International Experience...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the ...

  9. Ancillary-service details: Dynamic scheduling

    SciTech Connect (OSTI)

    Hirst, E.; Kirby, B.

    1997-01-01

    Dynamic scheduling (DS) is the electronic transfer from one control area to another of the time-varying electricity consumption associated with a load or the time-varying electricity production associated with a generator. Although electric utilities have been using this technique for at least two decades, its use is growing in popularity and importance. This growth is a consequence of the major changes under way in US bulk-power markets, in particular efforts to unbundle generation from transmission and to increase competition among generation providers. DS can promote competition and increase choices. It allows consumers to purchase certain services from entities outside their physical-host area and it allows generators to sell certain services to entities other than their physical host. These services include regulation (following minute-to-minute variations in load) and operating reserves, among others. Such an increase in the number of possible suppliers and customers should encourage innovation and reduce the costs and prices of providing electricity services. The purpose of the project reported here was to collect and analyze data on utility experiences with DS. Chapter 2 provides additional details and examples of the definitions of DS. Chapter 3 explains why DS might be an attractive service that customers and generators, as well as transmission providers, might wan to use. Chapter 4 presents some of the many current DS examples the authors uncovered in their interviews. Chapter 5 discusses the costs and cost-effectiveness of DS. Chapter 6 explains what they believe can and cannot be electronically moved from one control area to another, primarily in terms of the six ancillary services that FERC defined in Order 888. Chapter 7 discusses the need for additional research on DS.

  10. Load Participation in Ancillary Services Workshop

    Broader source: Energy.gov [DOE]

    The Load Participation in Ancillary Services Workshop was held October 25-26, 2011, in Washington, DC. This U.S. Department of Energy workshop was attended by members of the electric power industry, researchers, and policy makers. The results of the workshop informed the Demand Response and Energy Storage Study.

  11. Ancillary Service Revenue Potential for Geothermal Generators in California

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Ancillary Service Revenue Potential for Geothermal Generators in California Ancillary Service Revenue Potential for Geothermal Generators in California PDF icon Ancillary Service Revenue Potential for Geothermal Generators in California.pdf More Documents & Publications Increasing Renewable Energy with Hydrogen Storage and Fuel Cell Technologies Quantifying the Value of Hydropower in the Electric Grid: Final Report Load Participation in Ancillary Services Workshop

  12. Analysis of wind power ancillary services characteristics with German 250-MW wind data

    SciTech Connect (OSTI)

    Ernst, B.

    1999-12-09

    With the increasing availability of wind power worldwide, power fluctuations have become a concern for some utilities. Under electric industry restructuring in the US, the impact of these fluctuations will be evaluated by examining provisions and costs of ancillary services for wind power. This paper analyzes wind power in the context of ancillary services, using data from a German 250 Megawatt Wind project.

  13. Load Participation in Ancillary Services Workshop Materials | Department of

    Office of Environmental Management (EM)

    Energy Load Participation in Ancillary Services Workshop Materials Load Participation in Ancillary Services Workshop Materials In October 2011, the U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE) and Office of Electricity Delivery and Energy Reliability (OE), hosted a two-day workshop in Washington, DC to examine technical, institutional, economic, regulatory, and policy issues regarding the participation of load as a provider of ancillary services

  14. Opportunities for Mass Market Demand Response to Provide Ancillary Services

    SciTech Connect (OSTI)

    Pratt, Rob; Najewicz, Dave

    2011-10-01

    Discusses what is meant by mass market demand response to provide ancillary services and outlines opportunities for adoption, and barriers to adoption.

  15. Demand Response Resources for Energy and Ancillary Services (Presentation)

    SciTech Connect (OSTI)

    Hummon, M.

    2014-04-01

    Demand response (DR) resources present a potentially important source of grid flexibility particularly on future systems with high penetrations of variable wind an solar power generation. However, DR in grid models is limited by data availability and modeling complexity. This presentation focuses on the co-optimization of DR resources to provide energy and ancillary services in a production cost model of the Colorado test system. We assume each DR resource can provide energy services by either shedding load or shifting its use between different times, as well as operating

  16. Appendix C: Transmission, Ancillary and Control Area Service...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ADMINISTRATOR'S FINAL RECORD OF DECISION Appendix C: Transmission, Ancillary and Control Area Service Rate Schedules BP-16-A-02-AP03 July 2015 BP-16-A-02-AP03 Page i...

  17. Survey of U.S. Ancillary Services Markets

    SciTech Connect (OSTI)

    Zhou, Zhi; Levin, Todd; Conzelmann, Guenter

    2016-01-01

    In addition to providing energy to end-consumers, power system operators are also responsible for ensuring system reliability. To this end, power markets maintain an array of ancillary services to ensure it is always possible to balance the supply and demand for energy in real-time. A subset of these ancillary services are commonly procured through market-based mechanisms: namely, Regulation, Spinning, and Non-spinning Reserves.

  18. Market and Policy Barriers for Demand Response Providing Ancillary Services

    Broader source: Energy.gov [DOE]

    In this study, we attempt to provide a comprehensive examination of various market and policy barriers to demand response providing ancillary services in both ISO/RTO and non-ISO/RTO regions, especially at the program provider level. It is useful to classify barriers in order to create a holistic understanding and identify parties that could be responsible for their removal. This study develops a typology of barriers focusing on smaller customers that must rely on a program provider (i.e., electric investor owned utility or IOU, ARC) to create an aggregated DR resource in order to bring ancillary services to the balancing authority. The barriers were identified through examinations of regulatory structures, market environments, and product offerings; and discussions with industry stakeholders and regulators.

  19. Loads Providing Ancillary Services: Review of International Experience

    Office of Environmental Management (EM)

    LBNL -62701 ORNL/TM-2007/060 PNNL-16618 Loads Providing Ancillary Services: Review of International Experience Grayson Heffner 1 , Charles Goldman 1 , Brendan Kirby 2 and Michael Kintner-Meyer 3 1. Lawrence Berkeley National Laboratory 2. Oak Ridge National Laboratory 3. Pacific Northwest National Laboratory Environmental Energy Technologies Division May 2007 The work described in this report was coordinated by the Consortium for Electric Reliability Technology Solutions and was funded by the

  20. Audit of Subsidized Ancillary Services at the Nevada Test Site, WR-B-95-08

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUDIT OF SUBSIDIZED ANCILLARY SERVICES AT THE NEVADA TEST SITE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov U. S. Department of

  1. Ancillary Services in the United States: Independent System Operator (ISO) Perspective (Presentation)

    SciTech Connect (OSTI)

    Cochran, J.

    2013-05-01

    The presentation provides an overview of how increasing penetrations of variable renewable energy on the electricity grid are impacting ancillary services markets in the United States.

  2. Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable Energy (Presentation)

    SciTech Connect (OSTI)

    Cochran, J.

    2013-05-01

    The presentation provides an overview of how increasing penetrations of variable renewable energy on the electricity grid are impacting ancillary services markets in the United States.

  3. Commercial Building Loads Providing Ancillary Services in PJM

    SciTech Connect (OSTI)

    MacDonald, Jason; Kiliccote, Sila; Boch, Jim; Chen, Jonathan; Nawy, Robert

    2014-06-27

    The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

  4. Effective Ancillary Services Market Designs on High Wind Power Penetration Systems: Preprint

    SciTech Connect (OSTI)

    Ela, E.; Kirby, B.; Navid, N.; Smith, J. C.

    2011-12-01

    This paper focuses on how the ancillary service market designs are implemented and how they may require changes on systems with greater penetrations of variable renewable energy suppliers, in particular wind power. Ancillary services markets have been developed in many of the restructured power system regions throughout the world. Ancillary services include the services that support the provision of energy to support power system reliability. The ancillary services markets are tied tightly to the design of the energy market and to the physics of the system and therefore careful consideration of power system economics and engineering must be considered in their design. This paper focuses on how the ancillary service market designs are implemented and how they may require changes on systems with greater penetrations of variable renewable energy suppliers, in particular wind power.

  5. Transactive Control and Coordination of Distributed Assets for Ancillary Services

    SciTech Connect (OSTI)

    Subbarao, Krishnappa; Fuller, Jason C.; Kalsi, Karanjit; Somani, Abhishek; Pratt, Robert G.; Widergren, Steven E.; Chassin, David P.

    2013-09-18

    The need to diversify energy supplies, the need to mitigate energy-related environmental impact, and the entry of electric vehicles in large numbers present challenges and opportunities to power system professionals. Wind and solar power provide many benefits, and to reap the benefits the resulting increased variability—forecasted as well as unforecasted—should be addressed. Demand resources are receiving increasing attention as one means of providing the grid balancing services. Control and coordination of a large number (~millions) of distributed smart grid assets requires innovative approaches. One such is transactive control and coordination (TC2)—a distributed, agent-based incentive and control system. The TC2 paradigm is to create a market system with the following characteristics: • Participation should be entirely voluntary. • The participant decides at what price s/he is willing to participate. • The bids and responses are automated. Such an approach has been developed and demonstrated by Pacific Northwest National Laboratory for energy markets. It is the purpose of this project to develop a similar approach for ancillary services. In this report, the following ancillary services are considered: • spinning reserve • ramping • regulation. These services are to be provided by the following devices: • refrigerators • water heaters • clothes dryers • variable speed drives. The important results are summarized below: The regulation signal can be divided into an energy-neutral high frequency component and a low frequency component. The high frequency component is particularly well suited for demand resources. The low frequency component, which carries energy non-neutrality, can be handled by a combination of generators and demand resources. An explicit method for such a separation is obtained from an exponentially weighted moving average filter. Causal filters (i.e., filters that process only present and past values of a signal) introduce delays that can be issues in some signal processing applications that treat the high frequency part as a noise to be eliminated. For regulation, the high frequency component is an essential part of the signal. The delay in the low frequency component is not a problem. A stochastic self-dispatch algorithm determines the response of the devices to the regulation signal. • In an ensemble of devices under normal operation, some devices turn on and some turn off in any time interval. Demand response necessitates turning off devices that would normally be on, or turning on devices that would normally be off. Over time, some of these would have turned off on their own. A formalism to determine expectation values under a combination of natural and forced attrition has been developed. This formalism provides a mechanism for accomplishing a desired power profile within a bid period. In particular, a method to minimize regulation requirement can be developed. The formulation provides valuable insights into control. • Some ancillary services—ramping to absorb unforecasted increase in renewable generation, and regulation down—require the demand resources to increase their energy use. Some resources such as HVAC systems can do this readily, whereas some others require enabling technology. Even without such technology, it is possible to arrange refrigerators and water heaters to have an energy debt and be ready to increase their energy use. A transactive bid mechanism of revolving debt can be developed for this purpose. Dramatic changes in control systems, architecture and markets are expected in the electrical grid. The technical capabilities of a large number of devices interacting with the grid are changing. While it is too early to describe complete solutions, TC2 has attractive features suitable for adapting to the changes. The analyses in this report and the activities planned for FY 14 and beyond are designed to facilitate this transition.

  6. DR Resources for Energy and Ancillary Services in the West (Presentation)

    SciTech Connect (OSTI)

    Hummon, M.; Kiliccote, S.

    2014-04-01

    Demand response (DR) resources present a potentially important source of grid flexibility however, DR in grid models is limited by data availability and modeling complexity. This presentation focuses on the co-optimization of DR resources to provide energy and ancillary services in a production cost model of the Colorado "test system". We assume each DR resource can provide energy services by either shedding load or shifting its use between different times, as well as operating reserves: frequency regulation, contingency reserve, and flexibility (or ramping) reserve. There are significant variations in the availabilities of different types of DR resources, which affect both the operational savings as well as the revenue for each DR resource. The results presented include the system-wide avoided fuel and generator start-up costs as well as the composite revenue for each DR resource by energy and operating reserves.

  7. Loads Providing Ancillary Services: Review of InternationalExperience-- Technical Appendix: Market Descriptions

    SciTech Connect (OSTI)

    Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

    2007-05-01

    In this study, we examine the arrangements for andexperiences of end-use loads providing ancillary services (AS) in fiveelectricity markets: Australia, the United Kingdom (UK), the Nordicmarket, and the ERCOT and PJM markets in the United States. Our objectivein undertaking this review of international experience was to identifyspecific approaches or market designs that have enabled customer loads toeffectively deliver various ancillary services (AS) products. We hopethat this report will contribute to the ongoing discussion in the U.S.and elsewhere regarding what institutional and technical developments areneeded to ensure that customer loads can meaningfully participate in allwholesale electricity markets.

  8. Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

    SciTech Connect (OSTI)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik

    2015-10-19

    The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

  9. Distributed Smart Grid Asset Control Strategies for Providing Ancillary Services

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Zhang, Wei; Lian, Jianming; Marinovici, Laurentiu D.; Moya, Christian; Dagle, Jeffery E.

    2013-10-30

    With large-scale plans to integrate renewable generation driven mainly by state-level renewable portfolio requirements, more resources will be needed to compensate for the uncertainty and variability associated with intermittent generation resources. Distributed assets can be used to mitigate the concerns associated with renewable energy resources and to keep costs down. Under such conditions, performing primary frequency control using only supply-side resources becomes not only prohibitively expensive but also technically difficult. It is therefore important to explore how a sufficient proportion of the loads could assume a routine role in primary frequency control to maintain the stability of the system at an acceptable cost. The main objective of this project is to develop a novel hierarchical distributed framework for frequency based load control. The framework involves two decision layers. The top decision layer determines the optimal gain for aggregated loads for each load bus. The gains are computed using decentralized robust control methods, and will be broadcast to the corresponding participating loads every control period. The second layer consists of a large number of heterogeneous devices, which switch probabilistically during contingencies so that aggregated power change matches the desired amount according to the most recently received gains. The simulation results show great potential to enable systematic design of demand-side primary frequency control with stability guarantees on the overall power system. The proposed design systematically accounts for the interactions between the total load response and bulk power system frequency dynamics. It also guarantees frequency stability under a wide range of time varying operating conditions. The local device-level load response rules fully respect the device constraints (such as temperature setpoint, compressor time delays of HVACs, or arrival and departure of the deferrable loads), which are crucial for implementing real load control programs. The promise of autonomous, Grid Friendly™ response by smart appliances in the form of under-frequency load shedding was demonstrated in the GridWise Olympic Peninsula Demonstration in 2006. Each controller monitored the power grid voltage signal and requested that electrical load be shed by its appliance whenever electric power-grid frequency fell below 59.95 Hz. The controllers and their appliances responded reliably to each shallow under-frequency event, which was an average of one event per day and shed their loads for the durations of these events. Another objective of this project was to perform extensive simulation studies to investigate the impact of a population of Grid Friendly™ Appliances (GFAs) on the bulk power system frequency stability. The GFAs considered in this report are represented as demonstration units with water heaters individually modeled.

  10. Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service

    SciTech Connect (OSTI)

    Ela, E.; Milligan, M.; Kirby, B.; Tuohy, A.; Brooks, D.

    2012-03-01

    Frequency responsive reserve is the autonomous response of generators and demand response to deviations of system frequency, usually as a result of the instantaneous outage of a large supplier. Frequency responsive reserve arrests the frequency decline resulting in the stabilization of system frequency, and avoids the triggering of under-frequency load-shedding or the reaching of unstable frequencies that could ultimately lead to system blackouts. It is a crucial service required to maintain a reliable and secure power system. Regions with restructured electricity markets have historically had a lack of incentives for frequency responsive reserve because generators inherently provided the response and on large interconnected systems, more than sufficient response has been available. This may not be the case in future systems due to new technologies and declining response. This paper discusses the issues that can occur without proper incentives and even disincentives, and proposes alternatives to introduce incentives for resources to provide frequency responsive reserve to ensure an efficient and reliable power system.

  11. Market and policy barriers for demand response providing ancillary services in U.S. markets

    SciTech Connect (OSTI)

    Cappers, Peter; MacDonald, Jason; Goldman, Charles

    2013-03-01

    This study provides an examination of various market and policy barriers to demand response providing ancillary services in both ISO/RTO and non-ISO/RTO regions, especially at the program provider level. It is useful to classify barriers in order to create a holistic understanding and identify parties that could be responsible for their removal. This study develops a typology of barriers focusing on smaller customers that must rely on a program provider (i.e., electric investor owned utility or IOU, ARC) to create an aggregated DR resource in order to bring ancillary services to the balancing authority. The barriers were identified through examinations of regulatory structures, market environments, and product offerings; and discussions with industry stakeholders and regulators. In order to help illustrate the differences in barriers among various wholesale market designs and their constituent retail environments, four regions were chosen to use as case studies: Colorado, Texas, Wisconsin, and New Jersey.

  12. Industrial Use of Distributed Generation in Real-Time Energy and Ancillary Service Markets

    SciTech Connect (OSTI)

    Hudson, C.R.

    2001-10-24

    Industrial consumers of energy now have the opportunity to participate directly in electricity generation. This report seeks to give the reader (1) insights into the various types of generation services that distributed generation (DG) units could provide, (2) a mechanism to evaluate the economics of using DG, (3) an overview of the status of DG deployment in selected states, and (4) a summary of the communication technologies involved with DG and what testing activities are needed to encourage industrial application of DG. Section 1 provides details on electricity markets and the types of services that can be offered. Subsequent sections in the report address the technical requirements for participating in such markets, the economic decision process that an industrial energy user should go through in evaluating distributed generation, the status of current deployment efforts, and the requirements for test-bed or field demonstration projects.

  13. Peer-to-Peer Consultations: Ancillary Services Peer Exchange with India: Experience from South Africa, Europe & the United States (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-05-01

    In support of national and subnational decision makers, the 21st Century Power Partnership regularly works with country partners to organize peer-to-peer consultations on critical issues. In March 2014, 21CPP collaborated with the Regulatory Assistance Project - India to host two peer-to-peer exchanges among experts from India, South Africa, Europe, and the United States to discuss the provision of ancillary services, particularly in the context of added variability and uncertainty from renewable energy. This factsheet provides a high level summary of the peer-to-peer consultation.

  14. Part II: Section B - Supplies, Services, and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B SUPPLIES AND SERVICES AND PRICE/COSTS DE-AC36-08GO28308 Modification M938 Section B - ii PART I SECTION B SUPPLIES AND SERVICES AND PRICE/COSTS TABLE OF CONTENTS B.1 Service Being Acquired ......................................................................................... 1 B.2 Obligation of Funds and Financial Limitations ...................................................... 1 B.3 Transition Cost, Estimated Costs and Maximum Available Fee ............................ 1 B.4 Allowability

  15. Section B: Supplies, Services and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION B SUPPLIES AND SERVICES AND PRICECOSTS Request for Proposal DE-RP36-07GO97036 PART I SECTION B SUPPLIES AND SERVICES AND PRICECOSTS TABLE OF CONTENTS B.1 Service Being ...

  16. Best Practices in Determining the Impacts of Municipal Programs on Energy Use, Air Quality, and Other Ancillary Costs and Benefits (Poster)

    SciTech Connect (OSTI)

    Brown, E.; Mosey, G.

    2006-10-03

    This poster, submitted for the CU Energy Initiative/NREL Symposium on October 3, 2006 held in Boulder, Colorado, discusses best practices for determining the impacts of municipal programs on energy use, air quality, and other costs and benefits.

  17. Incremental cost pricing of transmission services. Final report

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    This report, prepared by ICF Resources, under a sub-contract with IT Corporation, is concerned chiefly with examining the economic concepts underlying an Incremental Cost Pricing Framework (ICPF), which is defined here as a pricing regime that takes into account several factors: economic efficiency in terms of sending the correct long-term price signals to both users and owners of transmission assets; pricing of individual services in relationship to cost causation; full recovery of costs associated with transmission service; and applicability to real-world power systems without extraordinary administrative burdens. In the course of this examination, the report makes assumptions, as necessary, and assesses the extent to which they may or may not comport with real-world conditions. It also assesses the pros and cons of different approaches to pricing various components of transmission service without making a recommendation as to the superiority of one approach over another from a public policy perspective.

  18. LANSCE | Lujan Center | Ancillary Equipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ancillary Equipment For general questions, please contact the Lujan Center Sample Environments responsible: Victor Fanelli | vfanelli@lanl.gov | 505.667.8755 Sample and Equipment Shipping Instructions For questions regarding shipping procedures, contact the Lujan Center Experiment Coordinator: TBA Low Temperature Equipment Specifications Flight Path/Instrument Compatibility Responsible Displex closed-cycle refrigerators Tmin= 4 K to 12 K Tmax= 300 K to 340 K 11 - Asterix 04 - HIPPO 03 - HIPD 10

  19. Load Participation in Ancillary Services Workshop Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    controls on the load-side is growing. Driven by improved and widely available communications systems, load participation is becoming easier and more reliable; and there...

  20. Cost-of-Service Segmentation of Energy Consumers

    SciTech Connect (OSTI)

    Albert, A; Rajagopal, R

    2014-11-01

    Uncertainty in consumption is a key challenge at energy utility companies, which are faced with balancing highly stochastic demand with increasingly volatile supply characterized by significant penetration rates of intermittent renewable sources. This paper proposes a methodology to quantify uncertainty in consumption that highlights the dependence of the cost-of-service with volatility in demand. We use a large and rich dataset of consumption time series to provide evidence that there is a substantial degree of high-level structure in the statistics of consumption across users which may be partially explained by certain characteristics of the users. To uncover this structure, we propose a new technique for extracting typical statistical signatures of consumption-energy demand distributions (EDDs)-that is based on clustering distributions using a fast, approximated algorithm. We next study the factors influencing the choice of consumption signature and identify certain types of appliances and behaviors related to appliance operation that are most predictive. Finally, we comment on how structure in consumption statistics may be used to target residential energy efficiency programs to achieve greatest impact in curtailing cost of service.

  1. Part II: Section B: Supplies, Services and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B SUPPLIES AND SERVICES AND PRICECOSTS DE-AC36-08GO28308 Modification M801 Section B - ii PART I SECTION B SUPPLIES AND SERVICES AND PRICECOSTS TABLE OF CONTENTS B.1 Service...

  2. Municipal Utilities' Investment in Smart Grid Technologies Improves Services and Lowers Costs

    Office of Environmental Management (EM)

    October 2014 Municipal Utilities' Investment in Smart Grid Technologies Improves Services and Lowers Costs Page 1 U.S. Department of Energy |October 2014 Municipal Utilities' Investment in Smart Grid Technologies Improves Services and Lowers Costs Page ii Table of Contents Executive Summary ...................................................................................................................................... iii 1. Introduction

  3. Unbundling generation and transmission services for competitive electricity markets

    SciTech Connect (OSTI)

    Hirst, E.; Kirby, B.

    1998-01-01

    Ancillary services are those functions performed by the equipment and people that generate, control, and transmit electricity in support of the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission (FERC) defined such services as those `necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.` The nationwide cost of ancillary services is about $12 billion a year, roughly 10% of the cost of the energy commodity. More important than the cost, however, is the necessity of these services for bulk-power reliability and for the support of commercial transactions. FERC`s landmark Order 888 included a pro forma tariff with provision for six key ancillary services. The Interconnected Operations Services Working Group identified another six services that it felt were essential to the operation of bulk-power systems. Several groups throughput the United States have created or are forming independent system operators, which will be responsible for reliability and commerce. To date, the electricity industry (including traditional vertically integrated utilities, distribution utilities, power markets and brokers, customers, and state and federal regulators) has paid insufficient attention to these services. Although the industry had made substantial progress in identifying and defining the key services, much remains to be doe to specify methods to measure the production, delivery, and consumption of these services; to identify the costs and cost-allocation factors for these services; and to develop market and operating rules for their provision and pricing. Developing metrics, determining costs, and setting pricing rules are important because most of these ancillary services are produced by the same pieces of equipment that produce the basic electricity commodity. Thus, the production of energy and ancillary services is highly interactive, sometimes complementary and sometimes competing. In contrast to today`s typical time-invariant, embedded-cost prices, competitive prices for ancillary services would vary with system loads and spot prices for energy.

  4. PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

    Energy Savers [EERE]

    PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 ...................................................................................................... 2 TYPE OF CONTRACT B.2 ............................................................................................ 2 ITEM(S) BEING ACQUIRED B.3 .............................................................. 4 OBLIGATION AND AVAILABILITY OF FUNDS B.4

  5. ORISE: Delivering Cost Savings and Customer Service with Off-the-Shelf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software Cost Savings and Customer Service ORISE utilizes off-the-shelf software to provide peer review services at lower cost while meeting customer requirements The Oak Ridge Institute for Science and Education's (ORISE) Scientific Peer Review Program is no different than any other organization striving to do more with less in the current economy. With smaller budgets and faster turnaround needed for proposal reviews, utilizing Web-based collaboration tools to share information is

  6. Sideloaders in Rochester bring more service, less cost

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    Five years ago, city administrators for Rochester, NY ran a pilot program to determine the feasibility of recycling. Following confirmation that meaningful tonnages could indeed be removed from the city's waste stream by recycling, officials began to look at staffing requirements to implement a program. Their question: How could the city collect trash and recyclables without increasing the number of employees in the city's Department of Environmental Services The best answer, they felt, was by implementing a program that included a combination of streamlining and automation. This paper describes the program that was implemented.

  7. Policy Flash 2013-79 Professional and Consultant service cost (FAR

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31.205-33) | Department of Energy 9 Professional and Consultant service cost (FAR 31.205-33) Policy Flash 2013-79 Professional and Consultant service cost (FAR 31.205-33) Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at Jason.taylor@hq.doe.gov. PDF icon Flash_reminder (2).pdf More Documents & Publications Policy Flash

  8. Update on maintenance and service costs of commercial building ground-source heat pump systems

    SciTech Connect (OSTI)

    Cane, D.; Garnet, J.M.

    2000-07-01

    An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

  9. Identification and definition of unbundled electric generation and transmission services

    SciTech Connect (OSTI)

    Kirby, B.; Hirst, E.; Vancoevering, J.

    1995-03-01

    State and federal regulators, private and public utilities, large and small customers, power brokers and marketers, and others are engaged in major debates about the future structure of the electric industry. Although the outcomes are far from certain, it seems clear that customers will have much greater choices about the electric services they purchase and from whom they buy these services. This report examines the ``ancillary`` services that are today buried within the typical vertically integrated utility. These ancillary services support and make possible the provision of the basic services of generating capacity, energy supply, and power delivery. These ancillary services include: Management of generating units; reserve generating capacity to follow variations in customer loads, to provide capacity and energy when generating units or transmission lines suddenly fall, to maintain electric-system stability, and to provide local-area security; transmission-system monitoring and control; replacement of real power and energy losses; reactive-power management and voltage regulation; transmission reserves; repair and maintenance of the transmission network; metering, billing, and communications; and assurance of appropriate levels of power quality. Our focus in this report, the first output from a larger Oak Ridge National Laboratory project, is on identification and definition of these services. Later work in this project will examine more closely the costs and pricing options for each service.

  10. How Western Does Business: An Explanation of Western's Products and Services

    SciTech Connect (OSTI)

    2012-10-01

    The mission of the Western Area Power Administration is to market and deliver reliable, renewable, cost-based hydroelectric power and related services. This guide provides an overview of Western’s history and how Western carries out that mission and provides electrical, transmission and ancillary services. It also discusses how we develop plans for marketing our most valuable resources—long-term firm capacity and energy.

  11. Loads Providing Ancillary Services: Review of International Experience

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Dispatcher, v. 1 6. Newsletter of the IEA DSM Task XIII Project, IEA DSM Programme. IEEEPES 2005. Transmission and Distribution Conference & Exhibition: Asia and Pacific. ...

  12. Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service

    SciTech Connect (OSTI)

    Ela, E.; Tuohy, A.; Milligan, M.; Kirby, B.; Brooks, D.

    2012-05-01

    Frequency responsive reserve is the autonomous response of generators and demand response to deviations of system frequency, usually as a result of the instantaneous outage of a large supplier. This article discusses the issues that can occur without proper incentives and even disincentives, and proposes alternatives to introduce incentives for resources to provide frequency responsive reserve to ensure an efficient and reliable power system.

  13. DOE Workshop. Load Participation in Capacity and Ancillary Services Market

    SciTech Connect (OSTI)

    Boston, Terry

    2011-10-26

    Presents profile of PJM demand-side resources. PJM provides 24% of generation, 27% of load, and 19% of transmission assets in Eastern Interconnection. Includes case studies.

  14. Comverge contribution to load participation of ancillary services

    SciTech Connect (OSTI)

    Miyaji, Wendell

    2011-10-25

    Presents Comverge demand response program summary. Discusses advantages of residential aggregation and real-time load management. Compares residential and commercial.

  15. ISO New England – Results of Ancillary Service Pilot Programs

    SciTech Connect (OSTI)

    Lowell, Jon; Yoshimura, Henry

    2011-10-26

    Compares performance of pilot program assets and generation resources in alternative technology regulation and demand response reserves for flywheels and residential electric thermal storage.

  16. ARM - Field Campaign - AMIE-Gan Ancillary Disdrometer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    would love to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : AMIE-Gan Ancillary Disdrometer 2012.01.01 - 2012.02.10 Lead Scientist : Mariko Oue...

  17. Electricity prices in a competitive environment: Marginal cost pricing of generation services and financial status of electric utilities. A preliminary analysis through 2015

    SciTech Connect (OSTI)

    1997-08-01

    The emergence of competitive markets for electricity generation services is changing the way that electricity is and will be priced in the United States. This report presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated {open_quotes}cost-of-service{close_quotes} pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity patterns, production costs, and the financial integrity of electricity suppliers? This study is not intended to be a cost-benefit analysis of wholesale or retail competition, nor does this report include an analysis of the macroeconomic impacts of competitive electricity prices.

  18. Bearing repair services offer a cost-effective alternative to expensive replacement

    SciTech Connect (OSTI)

    2009-02-15

    The article, based on a presentation during MINExpo 2008, explains how advancement is bearing design, material, maintenance and repair methods have greatly improved the potential for and popularity of bearing repair as an effective way to extend bearing life. The Trinken Co. offers a variety of service options including repair, recertification, reconditioning and remanufacturing. Benefits of a quality repair program are outlined. 2 photos.

  19. Services

    Broader source: Energy.gov [DOE]

    The Office of Management provides many of the services that keep the Department of Energy Headquarters offices operational.  Other Program Offices also provide services to the employees at...

  20. Value of Demand Response: Quantities from Production Cost Modeling (Presentation)

    SciTech Connect (OSTI)

    Hummon, M.

    2014-04-01

    Demand response (DR) resources present a potentially important source of grid flexibility particularly on future systems with high penetrations of variable wind and solar power generation. However, managed loads in grid models are limited by data availability and modeling complexity. This presentation focuses on the value of co-optimized DR resources to provide energy and ancillary services in a production cost model. There are significant variations in the availabilities of different types of DR resources, which affect both the operational savings as well as the revenue for each DR resource. The results presented include the system-wide avoided fuel and generator start-up costs as well as the composite revenue for each DR resource by energy and operating reserves. In addition, the revenue is characterized by the capacity, energy, and units of DR enabled.

  1. Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services Engineering Services The Network OSCARS Fasterdata IPv6 Network Network Performance Tools The ESnet Engineering Team Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Engineering Services ESnet provides interoperable, effective, reliable, and high performance network communications infrastructure, and certain

  2. Services

    Broader source: Energy.gov [DOE]

    The Human Capital Office offers benefit, new employee orientation and some learning & development related services to all DOE employees. Additionally the Office supplies employee and labor...

  3. Audit of Fire and Emergency Medical Services Cost Sharing Between the Department of Energy and Los Alamos County, WR-B-96-01

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OFFICE OF INSPECTOR GENERAL AUDIT OF FIRE AND EMERGENCY MEDICAL SERVICES COST SHARING BETWEEN THE DEPARTMENT OF ENERGY AND LOS ALAMOS COUNTY The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of

  4. Workshop on environmental assessment. [Regulation of applications of nuclear energy and related ancillary systems

    SciTech Connect (OSTI)

    Watson, E.C.

    1982-07-01

    Objectives of the workshop were: to review and evaluate the state-of-the-art of environmental impact assessments as applied to the regulation of applications of nuclear energy and related ancillary systems; to identify areas where existing technology allows establishing acceptable methods or standard practices that will meet the requirements of the NRC regulations, standards and guides for both normal operations and off-standard conditions including accident considerations; to illuminate topics where existing models or analytical methods are deficient because of unverified assumptions, a paucity of empirical data, conflicting results reported in the literature or a need for observation of operation systems; to compile, analyze and synthesize a prioritized set of research needs to advance the state-of-the-art to the level which will meet all of the requirements of the Commission's regulations, standards and guides; and to develop bases for maintaining the core of regulatory guidance at the optimum level balancing technical capabilities with practical considerations of cost and value to the regulatory process. The discussion held in small group sessions on aquatic, atmospheric, and terrestrial pathways are presented. The following research needs were identified as common to all three groups: validation of models; characterization of source terms; development of screening techniques; basis for de minimis levels of contamination; and updating of objectives for environmental monitoring programs.

  5. Costs and Emissions Associated with Plug-In Hybrid Electric Vehicle Charging in the Xcel Energy Colorado Service Territory

    SciTech Connect (OSTI)

    Parks, K.; Denholm, P.; Markel, T.

    2007-05-01

    The combination of high oil costs, concerns about oil security and availability, and air quality issues related to vehicle emissions are driving interest in plug-in hybrid electric vehicles (PHEVs). PHEVs are similar to conventional hybrid electric vehicles, but feature a larger battery and plug-in charger that allows electricity from the grid to replace a portion of the petroleum-fueled drive energy. PHEVs may derive a substantial fraction of their miles from grid-derived electricity, but without the range restrictions of pure battery electric vehicles. As of early 2007, production of PHEVs is essentially limited to demonstration vehicles and prototypes. However, the technology has received considerable attention from the media, national security interests, environmental organizations, and the electric power industry. The use of PHEVs would represent a significant potential shift in the use of electricity and the operation of electric power systems. Electrification of the transportation sector could increase generation capacity and transmission and distribution (T&D) requirements, especially if vehicles are charged during periods of high demand. This study is designed to evaluate several of these PHEV-charging impacts on utility system operations within the Xcel Energy Colorado service territory.

  6. Regulatory issues associated with closure of the Hanford AX Tank Farm ancillary equipment

    SciTech Connect (OSTI)

    Becker, D.L.

    1998-09-02

    Liquid mixed, high-level radioactive waste has been stored in underground single-shell tanks at the US Department of Energy`s (DOE`s) Hanford Site. After retrieval of the waste from the single-shell tanks, the DOE will proceed with closure of the tank farm. The 241-AX Tank Farm includes four one-million gallon single-shell tanks in addition to sluice lines, transfer lines, ventilation headers, risers, pits, cribs, catch tanks, buildings, well and associated buried piping. This equipment is classified as ancillary equipment. This document addresses the requirements for regulatory close of the ancillary equipment in the Hanford Site 241-AX Tank Farm. The options identified for physical closure of the ancillary equipment include disposal in place, disposal in place after treatment, excavation and disposal on site in an empty single-shell tank, and excavation and disposal outside the AX Tank Farm. The document addresses the background of the Hanford Site and ancillary equipment in the AX Tank Farm, regulations for decontamination and decommissioning of radioactively contaminated equipment, requirements for the cleanup and disposal of radioactive wastes, cleanup and disposal requirements governing hazardous and mixed waste, and regulatory requirements and issues associated with each of the four physical closure options. This investigation was conducted by the Sandia National Laboratories, Albuquerque, New Mexico, during Fiscal Year 1998 for the Hanford Tanks Initiative Project.

  7. Second use of transportation batteries: Maximizing the value of batteries for transportation and grid services

    SciTech Connect (OSTI)

    Viswanathan, Vilayanur V.; Kintner-Meyer, Michael CW

    2010-09-30

    Plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) are expected to gain significant market share over the next decade. The economic viability for such vehicles is contingent upon the availability of cost-effective batteries with high power and energy density. For initial commercial success, government subsidies will be highly instrumental in allowing PHEVs to gain a foothold. However, in the long-term, for electric vehicles to be commercially viable, the economics have to be self-sustaining. Towards the end of battery life in the vehicle, the energy capacity left in the battery is not sufficient to provide the designed range for the vehicle. Typically, the automotive manufacturers indicated the need for battery replacement when the remaining energy capacity reaches 70-80%. There is still sufficient power (kW) and energy capacity (kWh) left in the battery to support various grid ancillary services such as balancing, spinning reserve, load following services. As renewable energy penetration increases, the need for such balancing services is expected to increase. This work explores optimality for the replacement of transportation batteries to be subsequently used for grid services. This analysis maximizes the value of an electric vehicle battery to be used as a transportation battery (in its first life) and then as a resource for providing grid services (in its second life). The results are presented across a range of key parameters, such as depth of discharge (DOD), number of batteries used over the life of the vehicle, battery life in vehicle, battery state of health (SOH) at end of life in vehicle and ancillary services rate. The results provide valuable insights for the automotive industry into maximizing the utility and the value of the vehicle batteries in an effort to either reduce the selling price of EVs and PHEVs or maximize the profitability of the emerging electrification of transportation.

  8. Recovery Act Weekly Video: 200 Area Asbestos Removal, U-Ancillary Demolition, 200 West Transfer Building Footings

    ScienceCinema (OSTI)

    None

    2012-06-14

    A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.

  9. Providing Reliability Services through Demand Response: A Prelimnary Evaluation of the Demand Response Capabilities of Alcoa Inc.

    SciTech Connect (OSTI)

    Starke, Michael R; Kirby, Brendan J; Kueck, John D; Todd, Duane; Caulfield, Michael; Helms, Brian

    2009-02-01

    Demand response is the largest underutilized reliability resource in North America. Historic demand response programs have focused on reducing overall electricity consumption (increasing efficiency) and shaving peaks but have not typically been used for immediate reliability response. Many of these programs have been successful but demand response remains a limited resource. The Federal Energy Regulatory Commission (FERC) report, 'Assessment of Demand Response and Advanced Metering' (FERC 2006) found that only five percent of customers are on some form of demand response program. Collectively they represent an estimated 37,000 MW of response potential. These programs reduce overall energy consumption, lower green house gas emissions by allowing fossil fuel generators to operate at increased efficiency and reduce stress on the power system during periods of peak loading. As the country continues to restructure energy markets with sophisticated marginal cost models that attempt to minimize total energy costs, the ability of demand response to create meaningful shifts in the supply and demand equations is critical to creating a sustainable and balanced economic response to energy issues. Restructured energy market prices are set by the cost of the next incremental unit of energy, so that as additional generation is brought into the market, the cost for the entire market increases. The benefit of demand response is that it reduces overall demand and shifts the entire market to a lower pricing level. This can be very effective in mitigating price volatility or scarcity pricing as the power system responds to changing demand schedules, loss of large generators, or loss of transmission. As a global producer of alumina, primary aluminum, and fabricated aluminum products, Alcoa Inc., has the capability to provide demand response services through its manufacturing facilities and uniquely through its aluminum smelting facilities. For a typical aluminum smelter, electric power accounts for 30% to 40% of the factory cost of producing primary aluminum. In the continental United States, Alcoa Inc. currently owns and/or operates ten aluminum smelters and many associated fabricating facilities with a combined average load of over 2,600 MW. This presents Alcoa Inc. with a significant opportunity to respond in areas where economic opportunities exist to help mitigate rising energy costs by supplying demand response services into the energy system. This report is organized into seven chapters. The first chapter is the introduction and discusses the intention of this report. The second chapter contains the background. In this chapter, topics include: the motivation for Alcoa to provide demand response; ancillary service definitions; the basics behind aluminum smelting; and a discussion of suggested ancillary services that would be particularly useful for Alcoa to supply. Chapter 3 is concerned with the independent system operator, the Midwest ISO. Here the discussion examines the evolving Midwest ISO market structure including specific definitions, requirements, and necessary components to provide ancillary services. This section is followed by information concerning the Midwest ISO's classifications of demand response parties. Chapter 4 investigates the available opportunities at Alcoa's Warrick facility. Chapter 5 involves an in-depth discussion of the regulation service that Alcoa's Warrick facility can provide and the current interactions with Midwest ISO. Chapter 6 reviews future plans and expectations for Alcoa providing ancillary services into the market. Last, chapter 7, details the conclusion and recommendations of this paper.

  10. High Energy Cost Grants

    Broader source: Energy.gov [DOE]

    The High Energy Cost Grant Program provides financial assistance for the improvement of energy generation, transmission, and distribution facilities servicing eligible rural communities with home...

  11. Workplace Charging Installation Costs

    Broader source: Energy.gov [DOE]

    Installation costs and services vary considerably, so employers are encouraged to obtain a number of quotes before moving forward with any installation. An initial site investigation should include:

  12. Energy Service Companies

    Broader source: Energy.gov [DOE]

    Energy service companies (ESCOs) develop, design, build, and fund projects that save energy, reduce energy costs, decrease operations and maintenance costs at their customers' facilities.

  13. Molecular Structure Laboratory. Fourier Transform Nuclear Magnetic Resonance (FTNMR) Spectrometer and Ancillary Instrumentation at SUNY Geneseo

    SciTech Connect (OSTI)

    Geiger, David K

    2015-12-31

    An Agilent 400-MR nuclear magnetic resonance (NMR) spectrometer and ancillary equipment were purchased, which are being used for molecular structure elucidation.  The instrumentation is housed in a pre-existing facility designed specifically for its use. This instrument package is being used to expand the research and educational efforts of the faculty and students at SUNY-Geneseo and is made available to neighboring educational institutions and business concerns.  Funds were also used for training of College personnel, maintenance of the instrumentation, and installation of the equipment.

  14. Black Hills Power, Inc. Smart Grid Project | Open Energy Information

    Open Energy Info (EERE)

    System Targeted Benefits Reduced Meter Reading Costs Improved Electric Service Reliability Reduced Ancillary Service Cost Reduced Truck Fleet Fuel Usage Reduced Greenhouse...

  15. Black Hills/Colorado Electric Utility Co. Smart Grid Project...

    Open Energy Info (EERE)

    Thermostats Targeted Benefits Reduced Meter Reading Costs Improved Electric Service Reliability Reduced Ancillary Service Cost Reduced Truck Fleet Fuel Usage Reduced Greenhouse...

  16. Cheyenne Light, Fuel and Power Company Smart Grid Project | Open...

    Open Energy Info (EERE)

    System Targeted Benefits Reduced Meter Reading Costs Improved Electric Service Reliability Reduced Ancillary Service Cost Reduced Truck Fleet Fuel Usage Reduced Greenhouse...

  17. Startup Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

  18. Preliminary Results of Ancillary Safety Analyses Supporting TREAT LEU Conversion Activities

    SciTech Connect (OSTI)

    Brunett, A. J.; Fei, T.; Strons, P. S.; Papadias, D. D.; Hoffman, E. A.; Kontogeorgakos, D. C.; Connaway, H. M.; Wright, A. E.

    2015-10-01

    The Transient Reactor Test Facility (TREAT), located at Idaho National Laboratory (INL), is a test facility designed to evaluate the performance of reactor fuels and materials under transient accident conditions. The facility, an air-cooled, graphite-moderated reactor designed to utilize fuel containing high-enriched uranium (HEU), has been in non-operational standby status since 1994. Currently, in support of the missions of the Department of Energy (DOE) National Nuclear Security Administration (NNSA) Material Management and Minimization (M3) Reactor Conversion Program, a new core design is being developed for TREAT that will utilize low-enriched uranium (LEU). The primary objective of this conversion effort is to design an LEU core that is capable of meeting the performance characteristics of the existing HEU core. Minimal, if any, changes are anticipated for the supporting systems (e.g. reactor trip system, filtration/cooling system, etc.); therefore, the LEU core must also be able to function with the existing supporting systems, and must also satisfy acceptable safety limits. In support of the LEU conversion effort, a range of ancillary safety analyses are required to evaluate the LEU core operation relative to that of the existing facility. These analyses cover neutronics, shielding, and thermal hydraulic topics that have been identified as having the potential to have reduced safety margins due to conversion to LEU fuel, or are required to support the required safety analyses documentation. The majority of these ancillary tasks have been identified in [1] and [2]. The purpose of this report is to document the ancillary safety analyses that have been performed at Argonne National Laboratory during the early stages of the LEU design effort, and to describe ongoing and anticipated analyses. For all analyses presented in this report, methodologies are utilized that are consistent with, or improved from, those used in analyses for the HEU Final Safety Analysis Report (FSAR) [3]. Depending on the availability of historical data derived from HEU TREAT operation, results calculated for the LEU core are compared to measurements obtained from HEU TREAT operation. While all analyses in this report are largely considered complete and have been reviewed for technical content, it is important to note that all topics will be revisited once the LEU design approaches its final stages of maturity. For most safety significant issues, it is expected that the analyses presented here will be bounding, but additional calculations will be performed as necessary to support safety analyses and safety documentation. It should also be noted that these analyses were completed as the LEU design evolved, and therefore utilized different LEU reference designs. Preliminary shielding, neutronic, and thermal hydraulic analyses have been completed and have generally demonstrated that the various LEU core designs will satisfy existing safety limits and standards also satisfied by the existing HEU core. These analyses include the assessment of the dose rate in the hodoscope room, near a loaded fuel transfer cask, above the fuel storage area, and near the HEPA filters. The potential change in the concentration of tramp uranium and change in neutron flux reaching instrumentation has also been assessed. Safety-significant thermal hydraulic items addressed in this report include thermally-induced mechanical distortion of the grid plate, and heating in the radial reflector.

  19. Low-Cost Solutions for Dynamic Window Material

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low-cost Solutions For Dynamic Window Materials André Anders Lawrence Berkeley National Laboratory aanders@lbl.gov 510-486-6745 April 4, 2013 AZO: transparent and conducting 2 | Program Name or Ancillary Text eere.energy.gov BTO Program Peer Review Low-cost Solutions For Dynamic Window Materials André Anders Lawrence Berkeley National Laboratory aanders@lbl.gov 510-486-6745 April 4, 2013 Task 1: Reduce cost of transparent conducting oxide (TCO) for electrochromic windows, * started in FY11 *

  20. Georgia System Operations Corporation Inc. Smart Grid Project...

    Open Energy Info (EERE)

    Power Quality Optimized Generator Operation Reduced Ancillary Service Cost Reduced Electricity Costs for Customers Reduced Greenhouse Gas and Criteria Pollutant Emissions Reduced...

  1. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  2. FirstEnergy Service Company Smart Grid Project | Open Energy...

    Open Energy Info (EERE)

    Maintenance Costs Reduced Electricity Costs for Customers Improved Electric Service Reliability and Power Quality Reduced Costs from Equipment Failures, Distribution Line Losses...

  3. Service Buildings

    U.S. Energy Information Administration (EIA) Indexed Site

    Service Characteristics by Activity... Service Service buildings are those in which some type of service is provided, other than food service or retail sales of goods. Basic...

  4. B O N N E V I L L E ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    incremental transmission, and ancillary services costs were computed under 3,200 AURORA games which tested different load and resource conditions for each month. Incremental...

  5. BPA's Costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings and Workshops Customer...

  6. Utility Service Renovations

    Broader source: Energy.gov [DOE]

    Any upgrade to utility service provides an opportunity to revisit a Federal building's electrical loads and costs, but it also may provide an economic way to bundle the upgrade with an onsite renewable electricity project during renovation. Upgrading utility service to the site may involve improving or adding a transformer, upgrading utility meters, or otherwise modifying the interconnection equipment or services with the utility. In some cases, the upgrade may change the tariff structure for the facility and may qualify the property for a different structure with lower overall costs. In all cases, the implementation of renewable energy technologies should be identified during the design phase.

  7. Optimization of the phase angle in ideal Stirling engines using the concept of tidal and ancillary domains

    SciTech Connect (OSTI)

    Finkelstein, T.

    1996-12-31

    In a parallel publication (Finkelstein, 1996), a new analysis of the ideal loss-less Stirling Cycle Machine was presented based upon the concept of overlapping Tidal and Ancillary domains. This has led to the definition of the following two dimensionless parameters: (1) the specific performance {Pi} for the unified measure of output for engines, refrigerators and heat pumps, and (2) the Tidal Compression Ratio {Kappa}, which is akin to the Compression Ratio in internal combustion machines and uniquely defines the operational characteristics of any Stirling Cycle Machine. An analysis to replace the alternative traditional Schmidt equation was presented and a new expression for the general performance of practical Stirling engines was derived from the first principles. An analytical optimization of the volumes of the three internal heat exchangers was also included. In this present paper, which is an extension of the above analysis, these new equations for the performance are utilized for an analytical optimization of the phase angles. It is shown that the optimum phase lead of the expansion space and the optimum phase lag of the compression space for an ideal isothermal machine is precisely {pi}/4 for all possible machines. This is independent of the previous conclusion that the pressure vector should have a zero phase lag or lead.

  8. Electricity Prices in a Competitive Environment: Marginal Cost Pricing

    Reports and Publications (EIA)

    1997-01-01

    Presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated cost-of-service pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity of electricity suppliers?

  9. Price/Cost Proposal Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRICE/COST PROPOSAL FORM Page No. of NREL Solicitation Document Number: Offeror's Name and Address: Title of Proposed Effort and Task No., Phase No., or Project Total, As Applicable: Telephone Number: Total Amount of Task/Phase No. ___________ $ _______________________ Proposal Summary Total $ ________________________ DETAIL DESCRIPTION OF COST ELEMENTS 1. DIRECT MATERIALS (Attach Itemized Listing for all Purchased Parts, Purchased Items or Services, Raw Materials, Standard Commercial Items, or

  10. Four homochiral coordination polymers contain N-acetyl-L-tyrosine and different N-donor ligand: Influence of metal cations, ancillary ligands and coordination modes

    SciTech Connect (OSTI)

    Li, Meng-Li; Song, Hui-Hua

    2013-10-15

    Using the chiral ligand N-acetyl-L-tyrosine (Hacty) and maintaining identical reaction conditions, Zn(II), Co(II), and Cd(II) salts provided four novel homochiral coordination polymers ([Zn(acty)(bipy){sub 2}(H{sub 2}O){sub 2}]·NO{sub 3}·2H{sub 2}O){sub n}1, ([Co(acty)(bipy){sub 2}(H{sub 2}O){sub 2}]·NO{sub 3}·2H{sub 2}O){sub n}2, ([Cd(acty){sub 2}(bipy)H{sub 2}O]·H{sub 2}O){sub n}3, and ([Cd(acty)(bpe){sub 2}(Ac)]·6H{sub 2}O){sub n}4 (bipy=4,4?-bipyridine; bpe=1,2-di(4-pyridyl)ethane) in the presence of ancillary ligands. Compounds 1 and 2 are isostructural 1D chain structures. The neighboring chains are further linked into a 3D supramolecular structure via ??? stacking and hydrogen bond interactions. Compound 3 shows a 2D network and 4 generates 1D infinite chains along the c-axis. Compounds 3 and 4 are further connected into 3D supramolecular network by hydrogen bond interactions. More importantly, coordination in acyl oxygen atoms and ancillary ligands (bpe) as monodentate decorating ligands in 4 are rarely reported. Ancillary ligands and metal cations significantly influence the structure of the complexes. The photoluminescence properties of 1, 3, and 4 were studied at room temperature. Circular dichroism (CD) of the complexes have been investigated. - Graphical abstract: Four new homochiral coordination polymers were prepared and structurally characterized, which investigate the influence of the ancillary ligands and metal ions on the design and synthesis of coordination polymers. Display Omitted - Highlights: • It is rarely reported that the chiral coordination polymers prepared with N-acetyl-L-tyrosine ligands. • The alkalescent acetyl oxygen atom is difficult to participate in coordination but it is happened in the N-acetyl-L-tyrosine ligands. • The ancillary ligands (4,4?-bipy and bpe) are present in an unusual coordination modes, monodentate decorating ligands in 1, 2 and 4. • Structure comparative analyses results indicate that the secondary ligands and metal ions influence the fabrication of these inorganic–organic arrangements.

  11. Service Resource Jason MacDonald (P.I. Sila Kiliccote)

    Energy Savers [EERE]

    Demonstrating Load as an Ancillary Service Resource Jason MacDonald (P.I. Sila Kiliccote) Lawrence Berkeley National Laboratory jsmacdonald@gmail.com September 16, 2014 Berkeley, CA DOE/OE Transmission Reliability R&D Load as a Resource (LaaR) Presentation Outline * Introduction: LaaR research areas * Context of 2014 research * FY2014 demonstration in PJM - Objectives - Synchronous Reserve Demo - Regulation Demo - Energy and Value Capture * FY2015 Research and Demonstrations - Project

  12. Estimating Specialty Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  13. In-Office Services:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office Services: Meet with an experienced attorney who can advise and represent you. Attorney Services include: * Reviewing and preparing documents * Making follow-up calls and writing letters * Providing legal advice and consultation * Representation in court Comprehensive Coverage protects you from costly legal fees. Most covered legal matters are 100% paid-in-full when you work with a Network Attorney. (See reverse side of flyer for details.) Reduced Fee Benefits are available for matters not

  14. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Waste Management Waste Management EM is dedicated to safely disposing of waste and seeks cost effective and environmentally responsible project execution methods. Read more Site & Facility Restoration Site & Facility Restoration EM provides integration, planning and analysis for all soil and groundwater remediation, deactivation and decommissioning (D&D) and facility engineering. This work includes sustainability projects to ensure that these activities are

  15. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services shutterstock_106609430_jpg.jpg

  16. Financing for Federal Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Financing is a significant portion of utility energy service contract (UESC) costs. Experience shows several things the federal government can do to get the best value by reducing UESC financial transaction costs and interest.

  17. Fundamental Drivers of the Cost and Price of Operating Reserves

    Broader source: Energy.gov [DOE]

    Operating reserves impose a cost on the electric power system by forcing system operators to keep partially loaded spinning generators available to respond to system contingencies and random variation in demand. Demand response and energy storage, may provide these services at lower cost to conventional generators. However, to estimate the potential value of these services, the cost of reserve services under various grid conditions must first be established. This analysis used a commercial grid simulation tool to evaluate the cost and price of several operating reserve services. These reserve products were evaluated in a utility system in the western United States, considering different system characteristics, renewable energy penetration, and several other sensitivities.

  18. Cost Model and Cost Estimating Software

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  19. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Contact User Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment...

  20. Activity Based Costing

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

  1. Hydrogen Threshold Cost Calculation

    Broader source: Energy.gov [DOE]

    DOE Hydrogen Program Record number11007, Hydrogen Threshold Cost Calculation, documents the methodology and assumptions used to calculate that threshold cost.

  2. Hydrogen Threshold Cost Calculation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    record documents the methodology and assumptions used to calculate that threshold cost. ... Calculation Methodology and Results: The consumer's cost per mile for the FCEV is set to ...

  3. LACED Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services LACED Services The expertise, capabilities, and facilities at Los Alamos enable use to provide a full suite of services that caters to countering explosive threats. v At LACED, we believe that technological knowhow is best leveraged through top-tier industrial partners, federal agencies, and academic institutions. LACED offers a variety of partnering mechanisms that enable access to federally developed technologies and R&D capabilities. If you have a complex problem related to

  4. Service Forms

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service Forms Beamtime Request Form Deposition Request Form Exposure Request Form - pdf Fly Cutting Request Form Hot Embossing Request Form Metrology Request Form...

  5. Consulting Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that causes error conditions IO optimization effective use of compilers advising on best strategies for porting code User Services staff members work closely with vendors to...

  6. A chronicle of costs

    SciTech Connect (OSTI)

    Elioff, T.

    1994-04-01

    This report contains the history of all estimated costs associated with the superconducting super collider.

  7. Cost Estimation Package

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  8. Life Cycle Cost Estimate

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

  9. INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

  10. Cost Competitive Electricity from Photovoltaic Concentrators Called

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    'Imminent' - News Releases | NREL Cost Competitive Electricity from Photovoltaic Concentrators Called 'Imminent' July 13, 2005 Golden, Colo. - Solar concentrators using highly efficient photovoltaic solar cells will reduce the cost of electricity from sunlight to competitive levels soon, attendees were told at a recent international conference on the subject. Herb Hayden of Arizona Public Service (APS) and Robert McConnell and Martha Symko-Davies of the U.S. Department of Energy's National

  11. Engineering Evaluation/Cost Analysis

    Office of Environmental Management (EM)

    PPPO/03-0145&D2 Engineering Evaluation/Cost Analysis for Group 1 Buildings X-103, X-334, and X-344B at the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio This document has been approved for public release: Henry H. Thomas (signature on file) 10/29/10 Classification & Information Control Officer Date Restoration Services, Inc. (RSI) contributed to the preparation of this document and should not be considered an eligible contractor for its review DOE/PPPO/03-0145&D2 Engineering

  12. Direct/Indirect Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

  13. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users...

  14. Power Plant Cycling Costs

    SciTech Connect (OSTI)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  15. SUPPORT ADMINISTRATIVE SERVICES FOR THE NATIONAL ENERGY TECHNOLOGY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SUPPORT ADMINISTRATIVE SERVICES FOR THE NATIONAL ENERGY TECHNOLOGY LABORATORY TABLE OF CONTENTS SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS ........................................................................ 8 B.1 SERVICES BEING ACQUIRED - SUPPORT ADMINISTRATIVE SERVICES ................................. 8 B.2 GUARANTEED MINIMUM CONTRACT VALUE - MAXIMUM AVAILABLE PERFORMANCE AWARD FEE

  16. Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services (Presentation)

    SciTech Connect (OSTI)

    Neubauer, J.; Pesaran, A.

    2013-05-01

    Battery electric vehicles (BEVs) could significantly reduce the nation's gasoline consumption and greenhouse gas emissions rates. However, both the upfront cost and the limited range of the vehicle are perceived to be deterrents to the widespread adoption of BEVs. A service provider approach to marketing BEVs, coupled with a battery swapping infrastructure deployment could address both issues and accelerate BEV adoption. This presentation examines customer selection, service usage statistics, service plan fees and driver economics. Our results show it is unlikely that a battery swapping service plan will be more cost-effective than ownership of a conventional vehicle. A battery swapping service plan may be a more cost-effective solution than a directly owned BEV for some single-vehicle, high-mileage consumers. However, other factors not considered in this analysis could decrease the viability of such a service.

  17. Total Estimated Contract Cost: Contract Option Period: Maximum...

    Office of Environmental Management (EM)

    & Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee September 2015 Site: Portsmouth Paducah Project Office...

  18. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Author Guidelines User Services Print General Inquiries: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 (dial last four numbers from on-site phones) Location: Building 6 mezzanine, Room 6-2212 Office hours: Monday-Friday 8am - 5pm (new users should arrive before 4pm) Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Group Leader User Services Sue Bailey Prospective users, Industry users This e-mail address

  19. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services Print General Inquiries: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 (dial last four numbers from on-site phones) Location: Building 6 mezzanine, Room 6-2212 Office hours: Monday-Friday 8am - 5pm (new users should arrive before 4pm) Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Group Leader User Services Sue Bailey Prospective users, Industry users This e-mail address is being protected from

  20. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Services General Inquiries: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 (dial last four numbers from on-site phones) Location: Building 6 mezzanine, Room 6-2212 Office hours: Monday-Friday 8am - 5pm (new users should arrive before 4pm) Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Group Leader User Services Sue Bailey Prospective users, Industry users This e-mail address is being protected from

  1. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Services Print General Inquiries: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 (dial last four numbers from on-site phones) Location: Building 6 mezzanine, Room 6-2212 Office hours: Monday-Friday 8am - 5pm (new users should arrive before 4pm) Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Group Leader User Services Sue Bailey Prospective users, Industry users This e-mail address is being protected

  2. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services Print General Inquiries: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 (dial last four numbers from on-site phones) Location: Building 6 mezzanine, Room 6-2212 Office hours: Monday-Friday 8am - 5pm (new users should arrive before 4pm) Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Group Leader User Services Sue Bailey Prospective users, Industry users This e-mail address is being protected from

  3. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Services Print General Inquiries: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 (dial last four numbers from on-site phones) Location: Building 6 mezzanine, Room 6-2212 Office hours: Monday-Friday 8am - 5pm (new users should arrive before 4pm) Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Group Leader User Services Sue Bailey Prospective users, Industry users This e-mail address is being protected

  4. User Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Services Print General Inquiries: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 (dial last four numbers from on-site phones) Location: Building 6 mezzanine, Room 6-2212 Office hours: Monday-Friday 8am - 5pm (new users should arrive before 4pm) Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Group Leader User Services Sue Bailey Prospective users, Industry users This e-mail address is being protected

  5. Energy Storage Activities in the United States Electricity Grid. May 2011 |

    Energy Savers [EERE]

    Department of Energy Activities in the United States Electricity Grid. May 2011 Energy Storage Activities in the United States Electricity Grid. May 2011 Energy storage technologies offer cost-effective flexibility and ancillary services needed by the U.S power grid. As policy reforms and decreasing technology costs facilitate market penetration, energy storage technologies offer increasingly competitive alternative means for utilities to engage these ancillary services. This report prepared

  6. Systematic Approach to Better Understanding Integration Costs

    SciTech Connect (OSTI)

    Stark, Gregory B.

    2015-09-01

    This research presents a systematic approach to evaluating the costs of integrating new generation and operational procedures into an existing power system, and the methodology is independent of the type of change or nature of the generation. The work was commissioned by the U.S. Department of Energy and performed by the National Renewable Energy Laboratory to investigate three integration cost-related questions: (1) How does the addition of new generation affect a system's operational costs, (2) How do generation mix and operating parameters and procedures affect costs, and (3) How does the amount of variable generation (non-dispatchable wind and solar) impact the accuracy of natural gas orders? A detailed operational analysis was performed for seven sets of experiments: variable generation, large conventional generation, generation mix, gas prices, fast-start generation, self-scheduling, and gas supply constraints. For each experiment, four components of integration costs were examined: cycling costs, non-cycling VO&M costs, fuel costs, and reserves provisioning costs. The investigation was conducted with PLEXOS production cost modeling software utilizing an updated version of the Institute of Electrical and Electronics Engineers 118-bus test system overlaid with projected operating loads from the Western Electricity Coordinating Council for the Sacramento Municipal Utility District, Puget Sound Energy, and Public Service Colorado in the year 2020. The test system was selected in consultation with an industry-based technical review committee to be a reasonable approximation of an interconnection yet small enough to allow the research team to investigate a large number of scenarios and sensitivity combinations. The research should prove useful to market designers, regulators, utilities, and others who want to better understand how system changes can affect production costs.

  7. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  8. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  9. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Choose a vehicle to compare fuel cost and emissions with a conventional vehicle. Select Fuel/Technology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Propane (LPG) Next Vehicle Cost Calculator Vehicle 0 City 0 Hwy (mi/gal) 0 City 0 Hwy (kWh/100m) Gasoline Vehicle 0 City 0 Hwy (mi/gal) Normal Daily Use 30.5 Total miles/day City 55 % Hwy 45 % Other Trips 3484 Total miles/year City 20 % Hwy 80 % Fuel Cost Emissions Annual Fuel Cost $ $/gal Annual

  10. Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services

    SciTech Connect (OSTI)

    Neubauer, J. S.; Pesaran, A.

    2013-01-01

    Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratory has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.

  11. Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services: Preprint

    SciTech Connect (OSTI)

    Neubauer, J.; Pesaran, A.

    2013-03-01

    Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratory has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.

  12. A Total Cost of Ownership Model for Low Temperature PEM Fuel Cells in Combined Heat and Power and Backup Power Applications

    SciTech Connect (OSTI)

    University of California, Berkeley; Wei, Max; Lipman, Timothy; Mayyas, Ahmad; Chien, Joshua; Chan, Shuk Han; Gosselin, David; Breunig, Hanna; Stadler, Michael; McKone, Thomas; Beattie, Paul; Chong, Patricia; Colella, Whitney; James, Brian

    2014-06-23

    A total cost of ownership model is described for low temperature proton exchange membrane stationary fuel cell systems for combined heat and power (CHP) applications from 1-250kW and backup power applications from 1-50kW. System designs and functional specifications for these two applications were developed across the range of system power levels. Bottom-up cost estimates were made for balance of plant costs, and detailed direct cost estimates for key fuel cell stack components were derived using design-for-manufacturing-and-assembly techniques. The development of high throughput, automated processes achieving high yield are projected to reduce the cost for fuel cell stacks to the $300/kW level at an annual production volume of 100 MW. Several promising combinations of building types and geographical location in the U.S. were identified for installation of fuel cell CHP systems based on the LBNL modelling tool DER CAM. Life-cycle modelling and externality assessment were done for hotels and hospitals. Reduced electricity demand charges, heating credits and carbon credits can reduce the effective cost of electricity ($/kWhe) by 26-44percent in locations such as Minneapolis, where high carbon intensity electricity from the grid is displaces by a fuel cell system operating on reformate fuel. This project extends the scope of existing cost studies to include externalities and ancillary financial benefits and thus provides a more comprehensive picture of fuel cell system benefits, consistent with a policy and incentive environment that increasingly values these ancillary benefits. The project provides a critical, new modelling capacity and should aid a broad range of policy makers in assessing the integrated costs and benefits of fuel cell systems versus other distributed generation technologies.

  13. Project Profile: Low-Cost Heliostat Development | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Heliostat Development Project Profile: Low-Cost Heliostat Development HiTek logo HiTek Services, under the Baseload CSP FOA, is conducting fundamental parametric analyses of the optimum heliostat size and developing a novel low-cost heliostat design. Approach There are four tasks under this award: Photo of a machine with two round discs connected by intertwined chains. Develop a means to determine the optimum size range of the heliostat, in terms of the applied forces and moments,

  14. Reducing the Cost of Energy in Northwest Alaska

    Energy Savers [EERE]

    in Reducing the Cost of Northwest Alaska NANA Regional Corporation, Inc. Shopping Trip in Alaska Shopping list: Anchorage Northwest Alaska (average) $20 $60 Diapers Sugar Flour Milk Eggs Bread Keeping the Lights On * This increasing cost of living impacts every aspect of economic life. * Families are choosing between food and fuel. * Organizations make tough choices about maintaining essential services under cost pressure. Real Risks, Real People * There are real risks if we don't find long-

  15. Service Center

    Energy Savers [EERE]

    ASSIGNMENTS Pamela Arias-Ortega - Administrative and judicial litigation; and personnel law and workforce discipline mailto:parias-ortega@doeal.gov Celina Baca - Research and special projects for litigation and general law group mailto:cbaca@doeal.gov Dick Blakely - Designated Agency Ethics Advisor - Administrative litigation and mediation services; and ethics mailto:rblakely@doeal.gov Jonathan Buckner - Administrative review hearings; and administrative hearings before EEOC and MSPB

  16. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  17. Decommissioning Unit Cost Data

    SciTech Connect (OSTI)

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-02-26

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

  18. Part II: Section B - Supplies, Services, and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Actual construction management fee available will be established through negotiation of ... Contractor's team that are: (1) small business(es); (2) Protg firms as part of an ...

  19. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II )

    1992-03-01

    Operations involving sand or solids washing are the most common of today's coiled tubing workover services. Wellbore cleanouts require pumping fluid that will entrain solids and return them to the surface. In most cases, wash fluids and solids are captured in surface tanks of sufficient volume to allow solids to settle out. Where practical, fluids are recirculated to reduce cost. An important concern when designing sand wash programs is correct fluid system selection. Wash fluids should closely balance BHP and provide piston like displacement for solids removal. This paper is an overview of compressible and incompressible fluids commonly used for coiled tubing services.

  20. Financing for Federal Utility Energy Service Contracts | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Financing for Federal Utility Energy Service Contracts Financing for Federal Utility Energy Service Contracts Financing is a significant portion of utility energy service contract (UESC) costs. Experience shows several things the federal government can do to get the best value by reducing UESC financial transaction costs and interest. Interest Rates Interest rates are based on the sum of an index rate on the date the transaction is signed and a "premium" or

  1. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and Renewable Energy Get Widget Code...

  2. Workplace Charging Equipment Costs

    Broader source: Energy.gov [DOE]

    Charging stations are available from a variety of manufacturers in a range of models for all charging applications. For a single port charging station, Level 1 hardware costs range from $300-$1,500...

  3. Estimating Renewable Energy Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

  4. INDEPENDENT COST REVIEW (ICR)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Report SOP Standard Operating Procedure TEC Total Estimated Cost TIPR Technical ... FY13 FY14 FY15 FY16 Total PED Construction TEC OPC TPC Note: above values include MR...

  5. System Cost Model

    Energy Science and Technology Software Center (OSTI)

    1996-03-27

    SCM is used for estimation of the life-cycle impacts (costs, health and safety risks) of waste management facilities for mixed low-level, low-level, and transuranic waste. SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing waste management facilities at Department of Energy (DOE) installations. SCM also provides transportation costs for intersite transfer of DOE wastes. SCM covers the entire DOE waste management complex tomore » allow system sensitivity analysis including: treatment, storage, and disposal configuration options; treatment technology selection; scheduling options; transportation options; waste stream and volume changes; and site specific conditions.« less

  6. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  7. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates.

  8. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Choose a vehicle to compare fuel cost and emissions with a conventional vehicle. Select Fuel/Technology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Next Vehicle Cost Calculator Update Your Widget Code This widget version will stop working on March 31. Update your widget code. Ă— Widget Code Select All Close U.S. Department of Energy Energy Efficiency and Renewable Energy

  9. FY 1995 cost savings report

    SciTech Connect (OSTI)

    Andrews-Smith, K.L., Westinghouse Hanford

    1996-06-21

    Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with an 8 percent reduction in our Environmental Management budget but at the same time were tasked with accomplishing additional workscope. This resulted in a Productivity Challenge whereby we took on more work at the beginning of the year than we had funding to complete. During the year, the Productivity Challenge actually grew to 23 percent because of recissions, Congressional budget reductions, and DOE Headquarters actions. We successfully met our FY 1995 Productivity Challenge through an aggressive cost reduction program that identified and eliminated unnecessary workscope and found ways to be more efficient. We reduced the size of the workforce, cut overhead expenses, eliminated paperwork, cancelled construction of new facilities, and reengineered our processes. We are proving we can get the job done better and for less money at Hanford. DOE`s drive to do it ``better, faster, cheaper`` has led us to look for more and larger partnerships with the private sector. The biggest will be privatization of Hanford`s Tank Waste Remediation System, which will turn liquid tank waste into glass logs for eventual disposal. We will also save millions of dollars and avoid the cost of replacing aging steam plants by contracting Hanford`s energy needs to a private company. Other privatization successes include the Hanford Mail Service, a spinoff of advanced technical training, low level mixed waste thermal treatment, and transfer of the Hanford Museums of Science and history to a private non-profit organization. Despite the rough roads and uncertainty we faced in FY 1995, less than 3 percent of our work fell behind schedule, while the work that was performed was completed with an 8.6 percent cost under-run. We not only met the FY 1995 productivity challenge, we also met our FY 1995-1998 savings commitments and accelerated some critical cleanup milestones. The challenges continue. Budgets remain on the decline, even while the expectations increase. Yet we are confident in our ability to keep our commitments and goals by identifying new efficiencies in the Hanford cleanup program. We will also pursue new contracting arrangements that will allow us to foster greater competition and use more commercial practices while maintaining our commitment to the safety and health of the public, our workers, and the environment.

  10. Factory Cost Model

    Energy Science and Technology Software Center (OSTI)

    1996-12-17

    The Factory Cost Model (FCM) is an economic analysis tool intended to provide flat panel display (FPD) and other similar discrete component manufacturers with the ability to make first-order estimates of the cost of unit production. This software has several intended uses. Primary among these is the ability to provide first-order economic analysis for future factories. Consequently, the model requires a minimal level of input detail, and accomodates situations where actual production data are notmore » available. This software is designed to be activity based such that most of the calculated direct costs are associated with the steps of a manufacturibg process. The FCM architecture has the ability to accomodate the analysis of existing manufacturing facilities. The FCM can provide assistance with strategic economic decisions surrounding production related matters. For instance, the program can project the effect on costs and resources of a new product''s introduction, or it can assess the potential cost reduction produced by step yield improvements in the manufacturing process.« less

  11. QGESS: Capital Cost Scaling Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the tonnes of CO2 utilized. The costs of the process are to include infrastructure, raw materials, processing, byproduct disposal, and utilities costs, as well as any other costs....

  12. Factors Impacting Decommissioning Costs - 13576

    SciTech Connect (OSTI)

    Kim, Karen; McGrath, Richard

    2013-07-01

    The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

  13. Low Cost, Durable Seal

    SciTech Connect (OSTI)

    Roberts, George; Parsons, Jason; Friedman, Jake

    2010-12-17

    Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

  14. Heliostat cost reduction study.

    SciTech Connect (OSTI)

    Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

    2007-06-01

    Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

  15. Power Services (pbl/about)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Power Services > About Power Services Power Services Home Page Other Related Web Sites Power Services Organization Power Services Financial Information Tribal Affairs Office...

  16. INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operating Procedures | Department of Energy INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures PDF icon ICR_ICE SOP_Sep 2013_Final.pdf More Documents & Publications ICR-ICE Standard Operating Procedures (Update Sept 2013) Contractor SOW Template - ICR Contractor SOW Template - ICE

  17. Cost Estimating, Analysis, and Standardization

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1984-11-02

    To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

  18. Pricing local distribution services in a competitive market

    SciTech Connect (OSTI)

    Duann, D.J.

    1995-12-01

    Unbundling and restructuring of local distribution services is the focus of the natural gas industry. As a result of regulatory reforms, a competitive local distribution market has emerged, and the validity of traditional cost-based regulation is being questioned. One alternative is to completely unbundle local distribution services and transform the local distribution company into a common carrier for intrastate transportation services. Three kinds of alternative pricing mechanisms are examined. For firm intrastate transportation services, cost-based pricing is the preferred method unless it can be shown that a competitive secondary market can be established and maintained. Pricing interruptible transportation capacity is discussed.

  19. Geothermal probabilistic cost study

    SciTech Connect (OSTI)

    Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

    1981-08-01

    A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

  20. substantially reduced production costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    production costs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  1. Reducing Power Factor Cost

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low power factor is expensive and inefficient. Many utility companies charge you an additional fee if your power factor is less than 0.95. Low power factor also reduces your electrical system's distribu- tion capacity by increasing current flow and causing voltage drops. This fact sheet describes power factor and explains how you can improve your power factor to reduce electric bills and enhance your electrical system's capacity. REDUCING POWER FACTOR COST To understand power factor, visualize a

  2. Levelized Power Generation Cost Codes

    Energy Science and Technology Software Center (OSTI)

    1996-04-30

    LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generationmore » cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor.« less

  3. Final report: Compiled MPI. Cost-Effective Exascale Application Development

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect report: Compiled MPI. Cost-Effective Exascale Application Development Citation Details In-Document Search Title: Final report: Compiled MPI. Cost-Effective Exascale Application Development Ă— You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in

  4. Levelized cost and levelized avoided cost of new generation resources...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    3 The importance of the factors varies among the technologies. For technologies such as solar and wind generation that have no fuel costs and relatively small variable O&M costs,...

  5. LIFE Cost of Electricity, Capital and Operating Costs

    SciTech Connect (OSTI)

    Anklam, T

    2011-04-14

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  6. Process Equipment Cost Estimation, Final Report

    Office of Scientific and Technical Information (OSTI)

    Process Equipment Cost Estimation Final Report January 2002 H.P. Loh U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 and P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and Jennifer Lyons and Charles W. White, III EG&G Technical Services, Inc. 3604 Collins Ferry Road, Suite 200 Morgantown, WV 26505 DOE/NETL-2002/1169 ii Disclaimer This report was prepared as an account of work sponsored by an

  7. Service Members Aim High-- for Energy Savings

    Broader source: Energy.gov [DOE]

    Service members are helping reduce our dependency on oil, and saving taxpayers' money, with their energy-saving efforts. Operation Change Out has cut $26.3 million in total energy costs and helped prevent more than 396 lbs. of carbon dioxide.

  8. Air Charter Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    301-10.143) promulgated by the General Services Administration (GSA) which implements ... that allow federal funded transportation services for travel and cargo movements to use ...

  9. Service-Poke

    Energy Science and Technology Software Center (OSTI)

    2012-02-10

    Service-Poke is a system which manages running services ensuring only one copy is running and potentially up to one more copy is marked for future execution.

  10. ORISE: Health physics services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Health physics services Nuclear power plant The Oak Ridge Institute for Science and Education (ORISE) offers comprehensive health physics services in a number of technical areas ...

  11. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L. ); Whitlow, R.R. )

    1992-07-01

    This paper reports that pulling tubing to clean out a production liner at Prudhoe Bay Unit Western Operating Area (PBU WOA) averages $600,000 to $800,000. Coiled tubing underreaming was developed to accomplish this objective at lower costs. Beginning in 1988, these operations have been improved through several generations of procedures and tool designs. Using current technology, the underreamer, in conjunction with coiled tubing, can reduce the cost of drilling out to a liner to about $50,000 or $100,000, depending on the amount and type of material to be removed. PBU WOA, operated by BP Exploration, produces about 600,000 bopd from 395 wells. Another 61 wells are used to inject produced water, seawater and miscible fluids. Most of the remedial well servicing operations are conducted using coiled tubing (CT). Three contract coiled tubing units (CTUs) work daily, performing wellbore cleanouts, stimulations, inflatable bridge plug installations and cement squeeze operations. About 42 underreaming jobs were performed from 1990 to 1991 at PBU WOA for an average cost of between $75,000 and $100,000, a cost savings of $500,000 power well compared to pulling tubing and cleaning out the wells conventionally.

  12. Cost | OpenEI Community

    Open Energy Info (EERE)

    Cost Home Ocop's picture Submitted by Ocop(5) Member 15 July, 2014 - 07:07 MHK LCOE Reporting Guidance Draft Cost Current DOE LCOE numerical modeling Performance Tidal Wave To...

  13. Wind Integration Cost and Cost-Causation: Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

    2013-10-01

    The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

  14. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  15. Hydropower Baseline Cost Modeling

    SciTech Connect (OSTI)

    O'Connor, Patrick W.; Zhang, Qin Fen; DeNeale, Scott T.; Chalise, Dol Raj; Centurion, Emma E.

    2015-01-01

    Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.

  16. International Services | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jefferson Lab International Services The International Services Office contributes to Jefferson Lab's intellectual and cultural diversity through its service to the international community. A D D I T I O N A L L I N K S: JRIS Home Registration Badging Visa/Immigration ID Requirements Immigration News/Updates top-right bottom-left-corner bottom-right-corner International Services The International Services Office contributes to Jefferson Lab's intellectual and cultural diversity through its

  17. Realistic costs of carbon capture

    SciTech Connect (OSTI)

    Al Juaied, Mohammed . Belfer Center for Science and International Affiaris); Whitmore, Adam )

    2009-07-01

    There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

  18. MOX Services Unclassified Information System PIA, National Nuclear Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administration | Department of Energy MOX Services Unclassified Information System PIA, National Nuclear Services Administration MOX Services Unclassified Information System PIA, National Nuclear Services Administration MOX Services Unclassified Information System PIA, National Nuclear Services Administration PDF icon MOX Services Unclassified Information System PIA, National Nuclear Services Administration More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant

  19. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2008-03-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  20. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

    2007-04-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

  1. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2009-12-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  2. Pentagon clings to costly lifestyle (Journal Article) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Pentagon clings to costly lifestyle Citation Details In-Document Search Title: Pentagon clings to costly lifestyle Chairman of the Joint Chiefs of Staff Colin Powell worked for more than half a year on a plan to save money by reducing duplication in the armed services. A few days before Powell released his report, Defense Secretary Les Aspin told the services to reduce the leftover Bush Defense budget by about $11 billion. Reporters outcried that President Clinton had ordered the budget slashed.

  3. Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Soft Costs The U.S. Department of Energy (DOE) SunShot Initiative accelerates the adoption of solar energy technologies in the marketplace. In support of SunShot Initiative goals, the solar office partners with manufacturers, communities, universities, utilities, and other stakeholders to: Reduce non-hardware costs Lower barriers Foster growth. These focus areas ensure that solar energy systems continue to become more affordable and accessible for Americans. Current Efforts DOE issues

  4. HTGR Cost Model Users' Manual

    SciTech Connect (OSTI)

    A.M. Gandrik

    2012-01-01

    The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

  5. COSTS ASSOCIATED WITH WHISTLEBLOWER ACTIONS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A (May, 2014) COSTS ASSOCIATED WITH WHISTLEBLOWER ACTIONS Applicability: This section is applicable to all elements of the Department of Energy including the National Nuclear Security Administration. References: * Section 627 of the Energy Policy Act of 2005, codified at 42 U.S.C. 5853 * DEAR 931.205-47(h), Costs related to legal and other proceedings * DEAR 952.216-7, Allowable cost and payment * DEAR 970.3102-05-47(h), Costs related to legal and other proceedings * DEAR 970.5232-2, Payments

  6. Project Cost Profile Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet File Project Cost Profile Spreadsheet.xlsx More Documents & Publications Statement of Work (SOW) Template ...

  7. Food Service Buildings

    U.S. Energy Information Administration (EIA) Indexed Site

    was a food service building were only asked whether the building was a restaurant, bar, fast food chain, or cafeteria (all the same category) or some other type of food service...

  8. NERSC FTP Upload Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC FTP Upload Service The NERSC FTP Upload service is designed for external collaborators to be able to send data to NERSC staff and users. It allows you to create a...

  9. 503 Service Temporarily Unavailable

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service Temporarily Unavailable The server is temporarily unable to service your request due to maintenance downtime or capacity problems. Please try again later. Web Server at cen-efrc.org

  10. Grid Software and Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services Grid Software and Services Overview Grid computing can include a broad range of technologies. At NERSC we are interested in new computational and data-centric services which enhance the productivity of science teams. The grid infrastructure we support (described below) can be used to manage jobs and data in ways that are otherwise difficult from the comamnd line. Grid services enable remote job management, file transfer and distributed computing workflows through the Globus Toolkit. Web

  11. National Service Activation Checklist

    Office of Environmental Management (EM)

    Service Activation Checklist You have just received information that you are being activated for national service. Covered or Not Covered If you have received notice to report for active duty - Army, Navy, Marines, Air Force, National Guard, Public Health Service, or Coast Guard and you are a Federal employee, you have employment and reemployment rights under the Uniformed Services Employment and Reemployment Act of 1994 (USERRA). Basics - Telling People What is Happening 1. Have you told your

  12. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services The Office of Congressional and Intergovernmental Affairs offers a broad range of services to a variety of constituencies and stakeholder groups. Dedicated to facilitating the flow of information between the Department and all constituencies, our office provides the following services. Congressional Affairs Serving as a central point of contact for interactions on congressional matters, our congressional affairs team offers expertise in coordinating and directing the

  13. Simple Lookup Service

    Energy Science and Technology Software Center (OSTI)

    2013-05-01

    Simple Lookup Service (sLS) is a REST/JSON based lookup service that allows users to publish information in the form of key-value pairs and search for the published information. The lookup service supports both pull and push model. This software can be used to create a distributed architecture/cloud.

  14. Analytical Services - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracting Wastren Advantage, Inc. Analytical Services Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Washington Closure Hanford HPM Corporation (HPMC) Wastren Advantage, Inc. Analytical Services HASQARD Focus Group Bechtel National, Inc. Washington River Protection Solutions Analytical Services Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Analytical laboratory analyses

  15. Mail Services User's Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-03

    This Guide provides information on using Department of Energy (DOE) mail services in accordance with U.S. Postal Service, General Services Administration (GSA), and DOE regulations. Cancels DOE M 573.1-1. Canceled by DOE N 251.89.

  16. USDA National Urban and Community Forestry Challenge Cost Share Grant Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture is accepting proposals for the National Urban and Community Forestry Challenge Cost Share Grant Program to assist the U.S. Forest Service in establishing the grant categories and recommendations of final proposals for the Forest Service to consider.

  17. Renewable Energy Cost Optimization Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    2007-12-31

    The Software allow users to determine the optimum combination of renewable energy technologies to minimize life cycle cost for a facility by employing various algorithms which calculate initial and operating cost, energy delivery, and other attributes associated with each technology as a function of size.

  18. Replacement Cost of Domestic Crude

    Energy Science and Technology Software Center (OSTI)

    1994-12-01

    The DEEPWATER model forecasts the replacement cost of domestic crude oil for 13 offshore regions in the lower 48 states. The replacement cost of domestic crude oil is the constant or levelized selling price that will recover the full expense of exploration, development, and productions with a reasonable return on capital.

  19. Use of Cost Estimating Relationships

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

  20. Reported Energy and Cost Savings From the ESPC Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Reported Energy and Cost Savings From the ESPC Program Reported Energy and Cost Savings From the ESPC Program These annual reports summarize the realization rate of energy and cost savings from the U.S. Department of Energy's energy savings performance contract (ESPC) program. These reports are based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Supplemental data are available for these reports. PDF icon 2014

  1. The cost of wetland creation and restoration. Final report

    SciTech Connect (OSTI)

    King, D.; Bohlen, C.

    1995-08-01

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  2. Service and Repair Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service and Repair Work Whenever on-site service or repair work needs to be done, a Procurement Work Sheet (PWS) must be completed, and possibly an IWS, authorized and released. PWS is required for service work even if there are no apparent hazards. PWS is required for work in Jupiter Laser Facility even if you have a PWS for service/repairs in another location. To complete a PWS for service work in Jupiter Laser Facility, please contact Sean Holte (2-3905, pager #05312). Notify Brent Stuart and

  3. Unreasonable Cost Waivers | Department of Energy

    Office of Environmental Management (EM)

    Unreasonable Cost Waivers Unreasonable Cost Waivers unreasonablecost10-03-2012.pdf cnmidecision.pdf eaglepassdecision.pdf...

  4. Low-Cost Microchannel Heat Exchanger

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... cooling application tests * Complete high pressure application integrity and performance tests * Define performance and cost advantages over conventional approach Cost ...

  5. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  6. Dabbrook Services | Open Energy Information

    Open Energy Info (EERE)

    Services Jump to: navigation, search Name: Dabbrook Services Place: Great Yarmouth, United Kingdom Zip: NR31 6PT Sector: Services Product: Provides design and engineering...

  7. Marine Services | Open Energy Information

    Open Energy Info (EERE)

    Marine Services Place: Florida Sector: Services Product: Marine Services is planning tidal energy projects off the coasts of California and Florida. References: Marine...

  8. EXCEPTIONAL SERVICE IN THE NATIONAL INTEREST

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EXCEPTIONAL SERVICE IN THE NATIONAL INTEREST For example, research on the impact of carbon storage on the subsurface biological environment is connected to the Climate Program Area by contributing research for the reduction of carbon emissions. Development of biofouling resistant water-treatment membranes will assist in creation of more energy efficient and lower-cost water supplies. In addition, research focused on mitigating biofouling is connected to the development of more efficient

  9. Geothermal Heat Pump Profitability in Energy Services

    SciTech Connect (OSTI)

    1997-11-01

    If geothermal heat pumps (GHPs) are to make a significant mark in the market, we believe that it will be through energy service pricing contracts offered by retailcos. The benefits of GHPs are ideally suited to energy service pricing (ESP) contractual arrangements; however, few retailcos are thoroughly familiar with the benefits of GHPs. Many of the same barriers that have prevented GHPs from reaching their full potential in the current market environment remain in place for retailcos. A lack of awareness, concerns over the actual efficiencies of GHPs, perceptions of extremely high first costs, unknown records for maintenance costs, etc. have all contributed to limited adoption of GHP technology. These same factors are of concern to retailcos as they contemplate long term customer contracts. The central focus of this project was the creation of models, using actual GHP operating data and the experience of seasoned professionals, to simulate the financial performance of GHPs in long-term ESP contracts versus the outcome using alternative equipment. We have chosen two case studies, which may be most indicative of target markets in the competitive marketplace: A new 37,000 square foot office building in Toronto, Ontario; we also modeled a similar building under the weather conditions of Orlando, Florida. An aggregated residential energy services project using the mass conversion of over 4,000 residential units at Ft. Polk, Louisiana. Our method of analyses involved estimating equipment and energy costs for both the base case and the GHP buildings. These costs are input in to a cash flow analysis financial model which calculates an after-tax cost for the base and GHP case. For each case study customers were assumed to receive a 5% savings over their base case utility bill. A sensitivity analysis was then conducted to determine how key variables affect the attractiveness of a GHP investment.

  10. BNL Technical Services Awarded Service-Disabled Veteran-Owned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BNL Technical Services Awarded Service-Disabled Veteran-Owned Small Business of the Year BNL Technical Services Awarded Service-Disabled Veteran-Owned Small Business of the Year ...

  11. Geothermal Exploration Cost and Time

    SciTech Connect (OSTI)

    Jenne, Scott

    2013-02-13

    The Department of Energy’s Geothermal Technology Office (GTO) provides RD&D funding for geothermal exploration technologies with the goal of lowering the risks and costs of geothermal development and exploration. The National Renewable Energy Laboratory (NREL) was tasked with developing a metric in 2012 to measure the impacts of this RD&D funding on the cost and time required for exploration activities. The development of this cost and time metric included collecting cost and time data for exploration techniques, creating a baseline suite of exploration techniques to which future exploration cost and time improvements can be compared, and developing an online tool for graphically showing potential project impacts (all available at http://en.openei.org/wiki/Gateway: Geothermal). This paper describes the methodology used to define the baseline exploration suite of techniques (baseline), as well as the approach that was used to create the cost and time data set that populates the baseline. The resulting product, an online tool for measuring impact, and the aggregated cost and time data are available on the Open Energy Information website (OpenEI, http://en.openei.org) for public access. - Published 01/01/2013 by US National Renewable Energy Laboratory NREL.

  12. Office of Headquarters Procurement Services - Employee Customer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Headquarters Procurement Services - Employee Customer Service Standards Office of Headquarters Procurement Services - Employee Customer Service Standards CUSTOMER FOCUS ...

  13. Cost comparison between private and public collection of residual household waste: Multiple case studies in the Flemish region of Belgium

    SciTech Connect (OSTI)

    Jacobsen, R.; Buysse, J.; Gellynck, X.

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer The goal is to compare collection costs for residual household waste. Black-Right-Pointing-Pointer We have clustered all municipalities in order to find mutual comparable pairs. Black-Right-Pointing-Pointer Each pair consists of one private and one public operating waste collection program. Black-Right-Pointing-Pointer All cases show that private service has lower costs than public service. Black-Right-Pointing-Pointer Municipalities were contacted to identify the deeper causes for the waste management program. - Abstract: The rising pressure in terms of cost efficiency on public services pushes governments to transfer part of those services to the private sector. A trend towards more privatizing can be noticed in the collection of municipal household waste. This paper reports the findings of a research project aiming to compare the cost between the service of private and public collection of residual household waste. Multiple case studies of municipalities about the Flemish region of Belgium were conducted. Data concerning the year 2009 were gathered through in-depth interviews in 2010. In total 12 municipalities were investigated, divided into three mutual comparable pairs with a weekly and three mutual comparable pairs with a fortnightly residual waste collection. The results give a rough indication that in all cases the cost of private service is lower than public service in the collection of household waste. Albeit that there is an interest in establishing whether there are differences in the costs and service levels between public and private waste collection services, there are clear difficulties in establishing comparisons that can be made without having to rely on a large number of assumptions and corrections. However, given the cost difference, it remains the responsibility of the municipalities to decide upon the service they offer their citizens, regardless the cost efficiency: public or private.

  14. Reported Energy and Cost Savings from the DOE ESPC Program

    SciTech Connect (OSTI)

    Shonder, John A; Slattery, Bob S; Atkin, Erica

    2012-01-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy's Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 134 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For 133 of the 134 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $95.7 million, total reported cost savings were $96.8 million, and total guaranteed cost savings were $92.1 million. This means that on average: ESPC contractors guaranteed 96% of the estimated cost savings, projects reported achieving 101% of the estimated cost savings, and projects reported achieving 105% of the guaranteed cost savings. For 129 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 5.371 million MMBtu, and reported savings were 5.374 million MMBtu, just over 100% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 129 projects were 10.400 million MMBtu, and reported saving were 10.405 million MMBtu, again, just over 100.0% of the estimated energy savings.

  15. Yearly Energy Costs for Buildings

    Energy Science and Technology Software Center (OSTI)

    1991-03-20

    COSTSAFR3.0 generates a set of compliance forms which will be attached to housing Requests for Proposals (RFPs) issued by Departments or Agencies of the Federal Government. The compliance forms provide a uniform method for estimating the total yearly energy cost for each proposal. COSTSAFR3.0 analyzes specific housing projects at a given site, using alternative fuel types, and considering alternative housing types. The program is designed around the concept of minimizing overall costs through energy conservationmore » design, including first cost and future utility costs, and estabilishes a standard design to which proposed housing designs are compared. It provides a point table for each housing type that can be used to determine whether a proposed design meets the standard and how a design can be modified to meet the standard.« less

  16. Cost Effective Water Heating Solutions

    Broader source: Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question"Are high-efficiency hot water heating systems worth the cost?"

  17. Web Service Interface (API)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service Interface (API) Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers Community Web Browser Interface (WBUI) Web Service Interface (API) Read More... Fasterdata IPv6 Network Network Performance Tools The ESnet Engineering Team Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems:

  18. Service Academies Research Associates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internships » SARA /collaboration/internships/service-academy-research-associates/_assets/images/banner-img.png Service Academies Research Associates Military academies come to Los Alamos for a summer of science. October 9, 2015 West Point cadets at the National Security Science Building at Los Alamos National Laboratory. Contact Jonathan S. Ventura Email SARA interns use science and engineering to meet challenges to national security. SARA: not what you'd expect Through the Service Academies

  19. Customer Service Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public

  20. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services SERVICES OF THE OFFICE OF THE GENERAL COUNSEL The Office of the General Counsel is responsible for providing legal advice, counsel, and support to the Secretary, Deputy Secretary, and all Departmental elements, except the National Nuclear Security Administration and the Federal Energy Regulatory Commission. This Office assures that the Department operates in compliance with all pertinent laws and regulations. The Immediate Office of the General Counsel directs, manages, and

  1. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Image courtesy of Dennis Schroeder, NREL 24505 Image courtesy of Dennis Schroeder, NREL 24505 The Office of Energy Efficiency and Renewable Energy (EERE) leads DOE efforts to build a strong, clean energy economy, a strategy that is aimed at reducing our reliance on foreign oil, saving families and businesses money, creating middle-class jobs, and reducing pollution. EERE offers the following resources and services: Key Topics: Energy Basics States and Local Communities Jobs,

  2. Wind Electrolysis: Hydrogen Cost Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electrolysis: Hydrogen Cost Optimization Genevieve Saur and Todd Ramsden Technical Report NREL/TP-5600-50408 May 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Wind Electrolysis: Hydrogen Cost Optimization Genevieve Saur, Todd

  3. Electricity Generation Cost Simulation Model

    Energy Science and Technology Software Center (OSTI)

    2003-04-25

    The Electricity Generation Cost Simulation Model (GENSIM) is a user-friendly, high-level dynamic simulation model that calculates electricity production costs for variety of electricity generation technologies, including: pulverized coal, gas combustion turbine, gas combined cycle, nuclear, solar (PV and thermal), and wind. The model allows the user to quickly conduct sensitivity analysis on key variables, including: capital, O&M, and fuel costs; interest rates; construction time; heat rates; and capacity factors. The model also includes consideration ofmore » a wide range of externality costs and pollution control options for carbon dioxide, nitrogen oxides, sulfur dioxide, and mercury. Two different data sets are included in the model; one from the U.S. Department of Energy (DOE) and the other from Platt's Research Group. Likely users of this model include executives and staff in the Congress, the Administration and private industry (power plant builders, industrial electricity users and electric utilities). The model seeks to improve understanding of the economic viability of various generating technologies and their emission trade-offs. The base case results using the DOE data, indicate that in the absence of externality costs, or renewable tax credits, pulverized coal and gas combined cycle plants are the least cost alternatives at 3.7 and 3.5 cents/kwhr, respectively. A complete sensitivity analysis on fuel, capital, and construction time shows that these results coal and gas are much more sensitive to assumption about fuel prices than they are to capital costs or construction times. The results also show that making nuclear competitive with coal or gas requires significant reductions in capital costs, to the $1000/kW level, if no other changes are made. For renewables, the results indicate that wind is now competitive with the nuclear option and is only competitive with coal and gas for grid connected applications if one includes the federal production tax credit of 1.8 cents/kwhr.« less

  4. Load Leveling Battery System Costs

    Energy Science and Technology Software Center (OSTI)

    1994-10-12

    SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer's monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer's peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer's side of themore » meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer's load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.« less

  5. Low Cost Non-Reactive

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Prepared: 10/28/09 Low Cost Non-Reactive Coating for Refractory Metals A non-reactive coating for refractory metals has been developed at The Ames Laboratory. Contamination of rare earth and reactive metals and their alloys has been a chronic problem that results from their interaction with the crucibles or other vessels used in high temperature processing or during other applications. As a consequence, processing and other costs are high due to the need to replace equipment or containers, or

  6. Syngas Mixed Alcohol Cost Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1, 2013 DOE Bioenergy Technologies Office: Project Peer Review Syngas Mixed Alcohol Cost Validation Abhijit Dutta, NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Enable research and development of cost-competitive biomass to liquid fuels by providing: - Techno-economic analysis (TEA) - Feedback to the research efforts Specific objective in 2012: Provide TEA and validate DOE BETO's goal to demonstrate technologies capable

  7. Estimated Cost Description Determination Date:

    Office of Environmental Management (EM)

    Revised and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next

  8. General Service LED Lamps

    SciTech Connect (OSTI)

    2012-04-01

    Solid-state lighting program technology fact sheet that compares general service incandescent lamps—i.e., light bulbs—to LED and CFL alternatives.

  9. Service | Open Energy Information

    Open Energy Info (EERE)

    Building Types 1 References EIA CBECS Building Types U.S. Energy Information Administration (Oct 2008) Retrieved from "http:en.openei.orgwindex.php?titleService&oldid27...

  10. In-Office Services:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    prior to and including trial Paid-In-Full 2,820 8 Administrative hearings for Social Security, Veterans, Medicare or Medicaid benefits - Legal services and court...

  11. Temporary Food Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Food Service The SLAC Caf, auditorium and visitor center have been closed and will be replaced with a new Science and User Support Building (SUSB). During this construction...

  12. BPA Power Services (PBL)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Executives Hydro Power 2010 Modified Streamflows BPA Fuel Mix Site Map Other Related Web Sites: BPA Energy Efficiency (EE) BPA Transmission Services BPA Environment, Fish, &...

  13. Mail Services User's Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-07-12

    This Manual provides detailed information on using the Department of Energy (DOE) mail services. Canceled by DOE G 573.1-1.

  14. Procurable Products, Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    printed wiring boards (PWB) using performance and design specifications. Commercial products and services procurement The following items are purchased through Just-In-Time...

  15. Products, Services: Not Procurable

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Furrier Physicians Amusements Gaming Produce ArtArtists Gift Shops Public Relations Art Galleries Glass Company Recreation Arts & Crafts GrocersGroceries Relocation Services...

  16. Internal Revenue Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ode X SCHEDULE A (Form 5500) Department of the Treasury Internal Revenue Service Department of Labor Employee Benefits Security Administration Pension Benefit...

  17. Internal Revenue Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Code SCHEDULE SB (Form 5500) Department of the Treasury Internal Revenue Service Department of Labor Employee Benefits Security Administration Pension Benefit...

  18. Web Service Interface (API)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers Community Web Browser Interface (WBUI) Web Service Interface (API) ...

  19. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services The Energy Saver Guide: Tips on Saving Energy and Money at Home is one service offered by Energy Saver. The guide is offered in English and Spanish and is available for ordering, download, and as an e-book. The Energy Saver Guide: Tips on Saving Energy and Money at Home is one service offered by Energy Saver. The guide is offered in English and Spanish and is available for ordering, download, and as an e-book. Energy Saver provides consumers and homeowners with information on

  20. Applying electrical utility least-cost approach to transportation planning

    SciTech Connect (OSTI)

    McCoy, G.A.; Growdon, K.; Lagerberg, B.

    1994-09-01

    Members of the energy and environmental communities believe that parallels exist between electrical utility least-cost planning and transportation planning. In particular, the Washington State Energy Strategy Committee believes that an integrated and comprehensive transportation planning process should be developed to fairly evaluate the costs of both demand-side and supply-side transportation options, establish competition between different travel modes, and select the mix of options designed to meet system goals at the lowest cost to society. Comparisons between travel modes are also required under the Intermodal Surface Transportation Efficiency Act (ISTEA). ISTEA calls for the development of procedures to compare demand management against infrastructure investment solutions and requires the consideration of efficiency, socioeconomic and environmental factors in the evaluation process. Several of the techniques and approaches used in energy least-cost planning and utility peak demand management can be incorporated into a least-cost transportation planning methodology. The concepts of avoided plants, expressing avoidable costs in levelized nominal dollars to compare projects with different on-line dates and service lives, the supply curve, and the resource stack can be directly adapted from the energy sector.

  1. Fundamental Drivers of the Cost and Price of Operating Reserves

    SciTech Connect (OSTI)

    Hummon, Marissa; Denholm, Paul; Jorgenson, Jennie; Palchak, David; Kirby, Brendan; Ma, Ookie

    2013-07-01

    Operating reserves impose a cost on the electric power system by forcing system operators to keep partially loaded spinning generators available for responding to system contingencies variable demand. In many regions of the United States, thermal power plants provide a large fraction of the operating reserve requirement. Alternative sources of operating reserves, such as demand response and energy storage, may provide more efficient sources of these reserves. However, to estimate the potential value of these services, the cost of reserve services under various grid conditions must first be established. This analysis used a commercial grid simulation tool to evaluate the cost and price of several operating reserve services, including spinning contingency reserves and upward regulation reserves. These reserve products were evaluated in a utility system in the western United States, considering different system flexibilities, renewable energy penetration, and other sensitivities. The analysis demonstrates that the price of operating reserves depend highly on many assumptions regarding the operational flexibility of the generation fleet, including ramp rates and the fraction of fleet available to provide reserves.

  2. NUCLEAR ENERGY SYSTEM COST MODELING

    SciTech Connect (OSTI)

    Francesco Ganda; Brent Dixon

    2012-09-01

    The U.S. Department of Energy’s Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative “Island” approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this island’s used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability distributions of key parameters and employs Monte Carlo sampling to arrive at an island’s cost probability density function (PDF). When comparing two NES to determine delta cost, strongly correlated parameters can be cancelled out so that only the differences in the systems contribute to the relative cost PDFs. For example, one comparative analysis presented in the paper is a single stage LWR-UOX system versus a two-stage LWR-UOX to LWR-MOX system. In this case, the first stage of both systems is the same (but with different fractional energy generation), while the second stage of the UOX to MOX system uses the same type transmuter but the fuel type and feedstock sources are different. In this case, the cost difference between systems is driven by only the fuel cycle differences of the MOX stage.

  3. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Learn more about the ways the Office of Project Management Oversight & Assessments supports the mission of the Department of Energy in the following areas: Project Assessments Project Management Policies and Guidance Project Assessment and Reporting System Project Management Controls/Earned Value Management System Project Management Career Development Program Project Management Performance Metrics Project Management Continuous Improvement Project Management Workshops and

  4. Retail Infrastructure Costs Comparison for Hydrogen and Electricity for Light-Duty Vehicles: Preprint

    SciTech Connect (OSTI)

    Melaina, M.; Sun, Y.; Bush, B.

    2014-08-01

    Both hydrogen and plug-in electric vehicles offer significant social benefits to enhance energy security and reduce criteria and greenhouse gas emissions from the transportation sector. However, the rollout of electric vehicle supply equipment (EVSE) and hydrogen retail stations (HRS) requires substantial investments with high risks due to many uncertainties. We compare retail infrastructure costs on a common basis - cost per mile, assuming fueling service to 10% of all light-duty vehicles in a typical 1.5 million person city in 2025. Our analysis considers three HRS sizes, four distinct types of EVSE and two distinct EVSE scenarios. EVSE station costs, including equipment and installation, are assumed to be 15% less than today's costs. We find that levelized retail capital costs per mile are essentially indistinguishable given the uncertainty and variability around input assumptions. Total fuel costs per mile for battery electric vehicle (BEV) and plug-in hybrid vehicle (PHEV) are, respectively, 21% lower and 13% lower than that for hydrogen fuel cell electric vehicle (FCEV) under the home-dominant scenario. Including fuel economies and vehicle costs makes FCEVs and BEVs comparable in terms of costs per mile, and PHEVs are about 10% less than FCEVs and BEVs. To account for geographic variability in energy prices and hydrogen delivery costs, we use the Scenario Evaluation, Regionalization and Analysis (SERA) model and confirm the aforementioned estimate of cost per mile, nationally averaged, but see a 15% variability in regional costs of FCEVs and a 5% variability in regional costs for BEVs.

  5. Commercial-Grade, Scalable Support and Training Services Platform |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Commercial-Grade, Scalable Support and Training Services Platform Commercial-Grade, Scalable Support and Training Services Platform Lead Performer: Big Ladder Software - Denver, CO DOE Funding: $149,554 Cost Share: N/A Project Term: June 2014 - March 2015 Funding Opportunity: Small Business Innovation Research FY 2014 Phase 1 Release 2 Awards Project Objective The Department of Energy has funded the development of two industry-leading simulation engines, EnergyPlus and

  6. Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 171 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 171 Section B Page B-2 B.1 Occupational Medical Services a. This is a performance-based, cost reimbursement service contract for the rendering of Occupational Medical Services for the U. S. Department of Energy's Hanford Site. The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as expressly set forth in this contract as furnished by the Government) and otherwise do all

  7. Modifications to Replacement Costs System

    SciTech Connect (OSTI)

    Godec, M. [ICF Resources, Inc., Fairfax, VA (United States)

    1989-05-18

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985.

  8. Cost-Causation and Integration Cost Analysis for Variable Generation

    SciTech Connect (OSTI)

    Milligan, M.; Ela, E.; Hodge, B. M.; Kirby, B.; Lew, D.; Clark, C.; DeCesaro, J.; Lynn, K.

    2011-06-01

    This report examines how wind and solar integration studies have evolved, what analysis techniques work, what common mistakes are still made, what improvements are likely to be made in the near future, and why calculating integration costs is such a difficult problem and should be undertaken carefully, if at all.

  9. The Value of Energy Storage for Grid Applications

    Broader source: Energy.gov [DOE]

    Electricity storage can provide multiple benefits to the grid, including the ability to levelize load, provide ancillary services, and provide firm capacity. Historically, it has been difficult to compare the value of electricity storage to alternative generation resources using simplified metrics, such as levelized cost of energy. To properly value energy storage requires detailed time-series simulations using software tools that can co-optimize multiple services provided by different storage technologies. This analysis uses a commercial grid simulation tool to examine the potential value of different general classes of storage devices when providing both energy and ancillary services.

  10. GAO Cost Estimating and Assessment Guide

    Broader source: Energy.gov [DOE]

    GAO Cost Estimating and Assessment Guide: Twelve Steps of a High-Quality Cost Estimating Process, from the first step of defining the estimate's purpose to the last step of updating the estimate to reflect actual costs and changes.

  11. Microsoft Word - Levelized Cost of Energy Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It takes into account all costs of generating electricity, including capital costs, ... - see OK wind capacity factor above o Capital cost - 1.75 mmMW (includes regional ...

  12. Natural gas cost for evaluating energy resource opportunities at Fort Stewart

    SciTech Connect (OSTI)

    Stucky, D.J.; Shankle, S.A.

    1993-01-01

    Ft. Stewart, a United States Army Forces Command (FORSCOM) installation located near Hinesville, Georgia, is currently undergoing an evaluation of its energy usage, which is being performed by Pacific Northwest Laboratory. In order to examine the energy resource opportunities (EROs) at Ft. Stewart, marginal fuel costs must be calculated. The marginal, or avoided, cost of gas service is used in conjunction with the estimated energy savings of an ERO to calculate the dollar value of those savings. In the case of natural gas, the costing becomes more complicated due to the installation of a propane-air mixing station. The propane-air station is being built under a shared energy savings (SES) contract. The building of a propane-air station allows Ft. Stewart to purchase natural gas from their local utility at an interruptible rate, which is lower than the rate for contracting natural gas on a firm basis. The propane-air station will also provide Ft. Stewart with fuel in the event that the natural gas supply is curtailed. While the propane-air station does not affect the actual cost of natural gas, it does affect the cost of services provided by gas. Because the propane-air station and the SES contract affect the cost of gas service, they must be included in the analysis. Our analysis indicates a marginal cost of gas service of 30.0 cents per therm, assuming a total propane usage by the mixing station of 42,278 gallons (38,600 therms) annually. Because the amount of propane that may be required in the event of a curtailment is small relative to the total service requirement, variations in the actual amount should not significantly affect the cost per therm.

  13. Alternative Fuels Data Center: Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Tools Printable Version Share this resource Send a link to Alternative Fuels Data Center: Vehicle Cost Calculator to someone by E-mail Share Alternative Fuels Data Center: Vehicle Cost Calculator on Facebook Tweet about Alternative Fuels Data Center: Vehicle Cost Calculator on Twitter Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Google Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Delicious Rank Alternative Fuels Data Center: Vehicle Cost Calculator on

  14. Dual Career Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Options » Dual Career Services Dual Career Services Los Alamos Lab recruits the best minds on the planet and offers job search information and assistance to our dual career spouses or partners. World-class talent often comes in pairs Attracting world-class talent to the Lab is a top priority. Top candidates must often consider the employment needs of a spouse or other family member before choosing to work in Los Alamos. The Dual Career Services program can help solve this challenge by

  15. Services | Department of Energy

    Energy Savers [EERE]

    Services Services The Office of Hearings and Appeals (OHA) is the quasi-judicial arm of the DOE that provides a variety of key services to DOE and the public. OHA has five core functions: 1.) Freedom of Information Act (FOIA) Appeals. The FOIA is one of the principal ways that members of the public can learn about what is happening inside their government. Individuals file more than 2,000 FOIA requests with the DOE each year. When a DOE office denies a FOIA request in whole or in part, the FOIA

  16. California Biomass Collaborative Energy Cost Calculators | Open...

    Open Energy Info (EERE)

    Biomass Collaborative Energy Cost Calculators Jump to: navigation, search Tool Summary LAUNCH TOOL Name: California Biomass Collaborative Energy Cost Calculators AgencyCompany...

  17. Property:Cost | Open Energy Information

    Open Energy Info (EERE)

    Cost Jump to: navigation, search This is a property of type Number. Retrieved from "http:en.openei.orgwindex.php?titleProperty:Cost&oldid285418...

  18. Benchmark the Fuel Cost of Steam Generation

    Broader source: Energy.gov [DOE]

    This tip sheet on benchmarking the fuel cost of steam provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  19. Hydrogen Production Cost Estimate Using Biomass Gasification...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Estimate Using Biomass Gasification: Independent Review Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review This independent review is the ...

  20. Example Cost Codes for Construction Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

  1. Reducing Photovoltaic Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photovoltaics Reducing Photovoltaic Costs Reducing Photovoltaic Costs Photo of gloved hands pouring liquid from a glass bottle to glass beaker. The development of more ...

  2. Regulatory cost-risk study

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This study is intended to provide some quantitative perspective by selecting certain examples of criteria for which estimates of risks and costs can be obtained, and the balance of the various risks, (i.e., internal versus external risks), can be put into perspective. 35 refs., 39 tabs. (JDB)

  3. Pollution prevention cost savings potential

    SciTech Connect (OSTI)

    Celeste, J.

    1994-12-01

    The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

  4. Wind Electrolysis: Hydrogen Cost Optimization

    SciTech Connect (OSTI)

    Saur, G.; Ramsden, T.

    2011-05-01

    This report describes a hydrogen production cost analysis of a collection of optimized central wind based water electrolysis production facilities. The basic modeled wind electrolysis facility includes a number of low temperature electrolyzers and a co-located wind farm encompassing a number of 3MW wind turbines that provide electricity for the electrolyzer units.

  5. Mandatory Photovoltaic System Cost Estimate

    Broader source: Energy.gov [DOE]

    If the customer has a ratio of estimated monthly kilowatt-hour (kWh) usage to line extension mileage that is less than or equal to 1,000, the utility must provide the comparison at no cost. If the...

  6. Examples of Cost Estimation Packages

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

  7. Web Feature Service Validator

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    This site allows state data contributors to validate their WFS services against a specified schema for tier 3 data. The application uses the USGIN models API at https://github.com/usgin/usginmodels.

  8. Web service performance script

    Energy Science and Technology Software Center (OSTI)

    2009-08-01

    This python script, available from ESRI and modified here, checks a server at specified intervals to ensure that web services remain up and running. If any are found to be off, they are automatically turned back on.

  9. Novel Low Cost, High Reliability Wind Turbine Drivetrain

    SciTech Connect (OSTI)

    Anthony Chobot; Debarshi Das; Tyler Mayer; Zach Markey; Tim Martinson; Hayden Reeve; Paul Attridge; Tahany El-Wardany

    2012-09-13

    Clipper Windpower, in collaboration with United Technologies Research Center, the National Renewable Energy Laboratory, and Hamilton Sundstrand Corporation, developed a low-cost, deflection-compliant, reliable, and serviceable chain drive speed increaser. This chain and sprocket drivetrain design offers significant breakthroughs in the areas of cost and serviceability and addresses the key challenges of current geared and direct-drive systems. The use of gearboxes has proven to be challenging; the large torques and bending loads associated with use in large multi-MW wind applications have generally limited demonstrated lifetime to 8-10 years [1]. The large cost of gearbox replacement and the required use of large, expensive cranes can result in gearbox replacement costs on the order of $1M, representing a significant impact to overall cost of energy (COE). Direct-drive machines eliminate the gearbox, thereby targeting increased reliability and reduced life-cycle cost. However, the slow rotational speeds require very large and costly generators, which also typically have an undesirable dependence on expensive rare-earth magnet materials and large structural penalties for precise air gap control. The cost of rare-earth materials has increased 20X in the last 8 years representing a key risk to ever realizing the promised cost of energy reductions from direct-drive generators. A common challenge to both geared and direct drive architectures is a limited ability to manage input shaft deflections. The proposed Clipper drivetrain is deflection-compliant, insulating later drivetrain stages and generators from off-axis loads. The system is modular, allowing for all key parts to be removed and replaced without the use of a high capacity crane. Finally, the technology modularity allows for scalability and many possible drivetrain topologies. These benefits enable reductions in drivetrain capital cost by 10.0%, levelized replacement and O&M costs by 26.7%, and overall cost of energy by 10.2%. This design was achieved by: (1) performing an extensive optimization study that deter-mined the preliminary cost for all practical chain drive topologies to ensure the most competitive configuration; (2) conducting detailed analysis of chain dynamics, contact stresses, and wear and efficiency characteristics over the chain�������¢����������������s life to ensure accurate physics-based predictions of chain performance; and (3) developing a final product design, including reliability analysis, chain replacement procedures, and bearing and sprocket analysis. Definition of this final product configuration was used to develop refined cost of energy estimates. Finally, key system risks for the chain drive were defined and a comprehensive risk reduction plan was created for execution in Phase 2.

  10. Test Circuit Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Circuit Service Network R&D Software-Defined Networking (SDN) Experimental Network Testbeds 100G SDN Testbed Dark Fiber Testbed Test Circuit Service Testbed Results Current Testbed Research Previous Testbed Research Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network

  11. ORISE: Health physics services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Health physics services Nuclear power plant The Oak Ridge Institute for Science and Education (ORISE) offers comprehensive health physics services in a number of technical areas for the U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC), as well as other federal and state agencies. From radiological facility audits and reviews to dose modeling and technical evaluations, ORISE is nationally-recognized for its health physics support to decontamination and decommissioning

  12. Services | Department of Energy

    Energy Savers [EERE]

    Services Services CD-0 Approval of Mission Need CD-1 Approval of Alternative CD-4 Approval of Project Completion CD-3 Approval to Start Construction CD-2 Approval of Performance Baseline Financial Closeout Complete CD-0 CD-1 CD-4 CD-3 CD-2 INITIATION DEFINITION EXECUTION CLOSEOUT Resource Center The ultimate objective of DOE's Project Management System is to deliver capital asset projects within the original performance baseline, on schedule, within budget, and fully capable of meeting mission

  13. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Expert Evaluations of Management Performance in DOE Health, Safety and Security The U.S. Department of Energy's (DOE) Office of Enterprise Assessments (EA) provides expert evaluations of management performance in safety, security and other areas by seasoned experts who are independent of line management and will ensure that training reflects the most current Departmental policy on safety and security issues. EA serves as an important check-and-balance that meets the

  14. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Integrated Environment, Health, Safety and Security Management The U.S. Department of Energy's (DOE) highest level commitment to ensure the protection of its workers, the environment and the communities that surround DOE facilities, is supported by corporate-level leadership and strategic vision to coordinate and integrate vital health, safety and security programs. The Office of Environment, Health, Safety and Security (EHSS) is established as DOE's central organization

  15. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Document Library The Office of Energy Policy and Systems Analysis produces a variety of reports, analyses and papers on a number of energy topics. Check back for archived versions of new documents and reference materials as they are released. Report: U.S. Energy Sector Vulnerabilities to Climate Change and Extreme Weather July 10, 2013 This report-part of the Administration's efforts to support national climate change adaptation planning through the Interagency Climate Change

  16. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services The Office of International Affairs supports the Secretary of Energy and other Departmental elements with a range of expertise on international energy activities. Among other areas, IA experts maintain extensive knowledge of the following issues: International Energy Policy Regional and country-specific energy policies and practices, technology developments, and market conditions in Africa, the Americas, Asia, Europe, Eurasia, and the Middle East Bilateral and multilateral

  17. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services The Office of Indian Energy coordinates and manages the government-to-government and intertribal collaboration involved in carrying out all DOE tribal energy-related activities and initiatives prescribed through the Energy Policy Act of 2005. Learn more about the Office of Indian Energy program initiatives. Indian Country Energy and Infrastructure Working Group Established by Energy Secretary Steven Chu, the Indian Country Energy and Infrastructure Working Group guides the

  18. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services The responsibilities of stakeholder relations are achieved through public outreach to and input from those individuals, groups, host communities, and other entities in the public and private sectors that are interested in or affected by any of the U.S. Department of Energy's (DOE or Department's) activities and decisions. Stakeholder Relations Information from Office of Legacy Management (LM) record holdings are shared with LM stakeholders following several formal request

  19. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services OE plays a major role in addressing immediate challenges to America's energy security, while sustaining applied research into new technologies and implementing policies to meet the challenges we will face in the future. Electricity Advisory Committee (EAC) Technology Development Electricity Policy Coordination & Implementation DOE Grid Tech Team Energy Assurance Cybersecurity Provides advice to the U.S. Department of Energy in implementing the Energy Policy Act of 2005,

  20. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services The Oak Ridge Office of Environmental Management has numerous and diverse responsibilities. Our ultimate mission is to remove environmental contamination to improve safety for local employees and residents and open land for future uses. Site cleanup is essential to remove risks and hazards at the site. In addition, removing facilities and legacy materials creates waste, and we must ensure waste is properly processed, disposed, and managed. However, to accomplish any of these

  1. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Links to related sites within DOE SBIR/STTR The purpose of this website is to provide information to small businesses interested in applying for DOE SBIR & STTR grants. SBIR funding opportunities Office of Science User facilities The Office of Science national scientific user facilities provide researchers with the most advanced tools of modern science including accelerators, colliders, supercomputers, light sources and neutron sources, as well as facilities for studying

  2. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Secretary Ernest Moniz takes a holistic view to diversity, recognizing that the goal of ensuring equal access to participation in the Department's programs and policies comes through in our workforce, our partners, our research, our policies, our education efforts, and our work with the general public. We invite you to browse our website to learn more about the ways we'd like to work with you to support the mission of the Energy Department. Minority Business and Economic

  3. Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Services Office of Inspector General Hotline: The Office of Inspector General (OIG) maintains a Hotline to facilitate the reporting of allegations of fraud, waste, abuse, or mismanagement in U.S. Department of Energy (DOE) programs or operations. If you wish to report such allegations, you may call, send a letter, or email the OIG Hotline as identified at the right. Allegations may be reported by DOE employees, DOE contractors, or the general public. Issues that should be reported:

  4. Task Order Awarded for Audit and Review Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy today awarded a Task Order to KPMG, LLP of McLean, VA for audit/review services that will cover a wide range of auditing services. These services will include: pricing proposals, requests for equitable adjustment, change order proposals, business systems (accounting, purchasing and billing systems), forward pricing rates, incurred costs audits, and terminations. Individual subtask orders will be placed for each specific assignment as needed from October 1, 2012 through September 30, 2013. The total not-toexceed value of the task order is $2,993,733.00.

  5. DOE Seeks Proposals for Portsmouth Plant Technical Services | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Portsmouth Plant Technical Services DOE Seeks Proposals for Portsmouth Plant Technical Services August 21, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati - The Department of Energy today issued a Request for Proposals (RFP) for an Environmental Technical Services acquisition at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio. The RFP proposes a cost-plus-award-fee contract for three-years with a one-time option out to five-years.

  6. United States Forest Service - Forest Service Environmental Appeals...

    Open Energy Info (EERE)

    Responses Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: United States Forest Service - Forest Service Environmental Appeals Responses Abstract...

  7. United States Forest Service - Forest Service Schedule of Proposed...

    Open Energy Info (EERE)

    Actions Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: United States Forest Service - Forest Service Schedule of Proposed Actions Abstract The...

  8. DOE TRANSCOM Technical Support Services DE-EM0002903 B-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B-1 PART 1 - THE SCHEDULE SECTION B SUPPLIES OR SERVICES PRICES / COST B.01 ITEMS BEING ACQUIRED ........................................................................................................ B-2 B.02 TYPE OF CONTRACT ................................................................................................................ B-2 B.03 LIMITATION OF FUNDS ........................................................................................................... B-2 B.04 PRICE

  9. Tax Deduction Qualified Software- Green Building Studio Web Service version 3.4

    Broader source: Energy.gov [DOE]

    Information about the Green Building Studio Web Service version 3.4 qualified computer software, which calculates energy and power cost savings that meet federal tax incentive requirements for commercial buildings.

  10. Building Technologies Program: Tax Deduction Qualified Software- Green Building Studio Web Service version 3.0

    Broader source: Energy.gov [DOE]

    Provides required documentation that Green Building Studio Web Service version 3.0 meets Internal Revenue Code §179D, Notice 2006-52, dated June 2, 2006, for calculating commercial building energy and power cost savings.

  11. Low Cost, Durable Seal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost, Durable Seal Low Cost, Durable Seal This presentation, which focuses on low cost, durable seals, was given by George Roberts of UTC Power at a February 2007 meeting on new fuel cell projects. PDF icon new_fc_roberts_utc.pdf More Documents & Publications Improved AST's Based on Real World FCV Data Low Cost Durable Seal Breakout Group 3: Water Management

  12. Hydrogen Pathway Cost Distributions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway Cost Distributions Hydrogen Pathway Cost Distributions Presentation on hydrogen pathway cost distributions presented January 25, 2006. PDF icon wkshp_storage_uihlein.pdf More Documents & Publications Manufacturing Cost Analysis of 1 kW and 5 kW Solid Oxide Fuel Cell (SOFC) for Auxiliary Power Applications Pathway and Resource Overview HyPro: Modeling the Hydrogen Transition

  13. Novel, Low-Cost Nanoparticle Production

    SciTech Connect (OSTI)

    2011-05-31

    Fact sheet describing a modular hybrid plasma reactor and process to manufacture low-cost nanoparticles

  14. Cost Study Manual | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Study Manual Cost Study Manual Update 6/29/12. PDF icon Memo regarding Cost Study Manual PDF icon Cost Study Manual More Documents & Publications Contractor Human Resources Management QER - Comment of Energy Innovation 7 QER - Comment of Energy Innovation 6

  15. Eastern Power Customer Services Manager

    Broader source: Energy.gov [DOE]

    This position is located in the Eastern Power Services organization (PSE) of Northwest Requirements Marketing, Power Services, and Bonneville Power Administration (BPA). Northwest (NW) Requirements...

  16. Western Power Customer Services Manager

    Broader source: Energy.gov [DOE]

    This position is located in the Western Power Services organization (PSW) of Northwest Requirements Marketing, Power Services, and Bonneville Power Administration (BPA). Northwest (NW) Requirements...

  17. DICE Diagnostic Service Joe Metzger

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    processes to support the services... Provide user interfaces and training to our NOC engineers so they can effectively use these services for diagnosing performance...

  18. Kirsten Fagnan NERSC User Services"

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JGI Compute Resource - 16 - compute nodes gpint nodes high priority & interacti ve nodes fpga web services database services login nodes filesyst ems ssh genepool.nersc.gov http:...

  19. Scotoil Services | Open Energy Information

    Open Energy Info (EERE)

    Services Product: Division of the Scotoil Group that delivers the group's suite of environmental services. Coordinates: 46.975867, -123.81598 Show Map Loading map......

  20. Cost benefit analysis of waste compaction alternatives at Lawrence Livermore National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1990-11-01

    This report presents a cost benefit analysis of the potential procurement and operation of various solid waste compactors, or, of the use of commercial compaction services, for compaction of solid transuranic (TRU), low-level radioactive, hazardous, and mixed wastes at Lawrence Livermore National Laboratory (LLNL) Hazardous Waste Management (HWM) facilities. The cost benefit analysis was conducted to determine if increased compaction capacity at HWM might afford the potential for significant waste volume reduction and annual savings in material, shipping, labor, and disposal costs. In the following cost benefit analysis, capital costs and recurring costs of increased HWM compaction capabilities are considered. Recurring costs such as operating and maintenance costs are estimated based upon detailed knowledge of system parameters. When analyzing the economic benefits of enhancing compaction capabilities, continued use of the existing HWM compaction units is included for comparative purposes. In addition, the benefits of using commercial compaction services instead of procuring a new compactor system are evaluated. 31 refs., 1 fig., 6 tabs.

  1. Water Availability, Cost, and Use

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Availability, Cost, and Use - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  2. 1998 Cost and Quality Annual

    Gasoline and Diesel Fuel Update (EIA)

    8) Distribution Category UC-950 Cost and Quality of Fuels for Electric Utility Plants 1998 Tables June 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of

  3. COST AND QUALITY TABLES 95

    Gasoline and Diesel Fuel Update (EIA)

    5 Tables July 1996 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts The annual publication Cost

  4. Factors Affecting PMU Installation Costs

    Office of Environmental Management (EM)

    September 2014 United States Department of Energy Washington, DC 20585 Department of Energy | September 2014 Factors Affecting PMU Installation Costs | Page ii Acknowledgments This report was sponsored by the U.S. Department of Energy's Office of Electricity Delivery and Energy Reliability (DOE-OE) and drafted by the Oak Ridge National Laboratory (ORNL). The effort was directed and supported by DOE program manager Joseph Paladino. The lead authors are Marcus Young of ORNL and Alison Silverstein

  5. ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services ...

  6. How to Estimate the Value of Service Reliability Improvements

    SciTech Connect (OSTI)

    Sullivan, Michael J.; Mercurio, Matthew G.; Schellenberg, Josh A.; Eto, Joseph H.

    2010-06-08

    A robust methodology for estimating the value of service reliability improvements is presented. Although econometric models for estimating value of service (interruption costs) have been established and widely accepted, analysts often resort to applying relatively crude interruption cost estimation techniques in assessing the economic impacts of transmission and distribution investments. This paper first shows how the use of these techniques can substantially impact the estimated value of service improvements. A simple yet robust methodology that does not rely heavily on simplifying assumptions is presented. When a smart grid investment is proposed, reliability improvement is one of the most frequently cited benefits. Using the best methodology for estimating the value of this benefit is imperative. By providing directions on how to implement this methodology, this paper sends a practical, usable message to the industry.

  7. Cost-effectiveness analysis of TxDOT LPG fleet conversion. Volume 1. Interim research report

    SciTech Connect (OSTI)

    Euritt, M.A.; Taylor, D.B.; Mahmassani, H.

    1992-10-01

    Increased emphasis on energy efficiency and air quality has resulted in a number of state and federal initiatives examining the use of alternative fuels for motor vehicles. Texas' program for alternate fuels includes liquefied petroleum gas (LPG). Based on an analysis of 30-year life-cycle costs, development of a propane vehicle program for the Texas Department of Transportation (TxDOT) would cost about $24.3 million (in 1991 dollars). These costs include savings from lower-priced LPG and differentials between propane and gasoline/diesel in infrastructure costs for a fueling station, vehicle costs, and operating costs. The 30-year life-cycle costs translate into an average annual vehicle cost increase of $308, or about 2.5 cents more per vehicle mile of travel. Sensitivity analyses are performed on the discount rate, price of propane, maintenance savings, vehicle utilization, diesel vehicles, extended vehicle life, original equipment manufacturer (OEM) vehicles, and operating and infrastructure costs. The best results are obtained when not converting diesel vehicles, converting only large fleets, and extending the period the vehicle is kept in service. Combining these factors yields results that are most cost-effective for TxDOT. This is volume one of two volumes.

  8. Technical Services Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TSA-AGMT.DOC (9/06/01) 04/14/13 Technical Services Agreement No. TSA- The National Renewable Energy Laboratory (hereinafter "NREL") Operating under Prime Contract No. DE-AC36-08GO28308 for the Department of Energy And <Sponsor>` (hereinafter "Sponsor") I. Parties to the Technical Services Agreement. The Alliance for Sustainable Energy, LLC as Management and Operating (M&O) Contractor for the National Renewable Energy Laboratory ("Contractor"), under U.S.

  9. Business Services | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Human Resources Jefferson Lab Business Services Jefferson Lab provides opportunities for both large and small businesses to engage with the lab and its scientific mission. A D D I T I O N A L L I N K S: E-Verify Solicitations Bidder Applications Vendor Toolbox Contacts Tech Transfer top-right bottom-left-corner bottom-right-corner Business Services Jefferson Lab spends approximately $73 million annually through procurements to a diverse group of large and small businesses for a broad range of

  10. VT Nuclear Services ltd | Open Energy Information

    Open Energy Info (EERE)

    VT Nuclear Services ltd Jump to: navigation, search Name: VT Nuclear Services ltd Place: Warrington, United Kingdom Zip: WA4 4BP Sector: Services Product: VT Nuclear Services...

  11. Customer Services Handbook, 2010, Office of Administration |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Customer Services Handbook, 2010, Office of Administration Customer Services Handbook, 2010, Office of Administration Customer Services Handbook PDF icon Customer Services ...

  12. Alternative Energy Services | Open Energy Information

    Open Energy Info (EERE)

    Services Jump to: navigation, search Logo: Alternative Energy Services Name: Alternative Energy Services Place: Florida Product: renewable energy products and services Phone...

  13. Power Services Site Map (pbl/help)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Contact Power Services | Help About Power Services Power Services Home Page Power Services Short Cuts Other Related Web Sites BPA Energy Efficiency Volunteer Energy...

  14. Office of Headquarters Procurement Services - Employee Customer Service

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards | Department of Energy Office of Headquarters Procurement Services - Employee Customer Service Standards Office of Headquarters Procurement Services - Employee Customer Service Standards CUSTOMER FOCUS The Office of Headquarters Procurement Services (MA-64) serves a variety of customers in the performance of its acquisition and financial assistance mission. Primary among its many customers is each of the Department of Energy Headquarters program offices. MA-64 continually seeks to

  15. Development of surface mine cost estimating equations

    SciTech Connect (OSTI)

    Not Available

    1980-09-26

    Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

  16. Hanford 222-S Laboratory Analysis and Testing Services Contract Number DE-EM0003722

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B-1 PART I - THE SCHEDULE SECTION B - SUPPLIES OR SERVICES PRICES / COST B.01 TYPE OF CONTRACT - ITEMS BEING ACQUIRED .............................................................. B-2 B.02 PRICE SCHEDULE ...................................................................................................................... B-2 B.03 LIMITATION OF GOVERNMENT'S OBLIGATION ............................................................... B-6 Hanford 222-S Laboratory Analysis and Testing Services

  17. Hanford 222-S Laboratory Analysis and Testing Services DE-EM0003722

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford 222-S Laboratory Analysis and Testing Services DE-EM0003722 B-1 PART I - THE SCHEDULE SECTION B - SUPPLIES OR SERVICES PRICES / COST B.01 TYPE OF CONTRACT - ITEMS BEING ACQUIRED .............................................................. B-2 B.02 PRICE SCHEDULE ...................................................................................................................... B-2 B.03 LIMITATION OF GOVERNMENT'S OBLIGATION

  18. Hanford 222-S Laboratory Analysis and Testing Services DE-EM0003722

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    signed by Original signed by Hanford 222-S Laboratory Analysis and Testing Services DE-EM0003722 B-1 PART I - THE SCHEDULE SECTION B - SUPPLIES OR SERVICES PRICES / COST B.01 TYPE OF CONTRACT - ITEMS BEING ACQUIRED .............................................................. B-2 B.02 PRICE SCHEDULE ...................................................................................................................... B-2 B.03 LIMITATION OF GOVERNMENT'S OBLIGATION

  19. DOE TRANSCOM Technical Support Services DE-EM0002903 B-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE TRANSCOM Technical Support Services DE-EM0002903 B-1 PART 1 - THE SCHEDULE SECTION B SUPPLIES OR SERVICES PRICES / COST B.01 ITEMS BEING ACQUIRED ........................................................................................................ B-2 B.02 TYPE OF CONTRACT ................................................................................................................ B-2 B.03 LIMITATION OF FUNDS

  20. Incorporating psychological influences in probabilistic cost analysis

    SciTech Connect (OSTI)

    Kujawski, Edouard; Alvaro, Mariana; Edwards, William

    2004-01-08

    Today's typical probabilistic cost analysis assumes an ''ideal'' project that is devoid of the human and organizational considerations that heavily influence the success and cost of real-world projects. In the real world ''Money Allocated Is Money Spent'' (MAIMS principle); cost underruns are rarely available to protect against cost overruns while task overruns are passed on to the total project cost. Realistic cost estimates therefore require a modified probabilistic cost analysis that simultaneously models the cost management strategy including budget allocation. Psychological influences such as overconfidence in assessing uncertainties and dependencies among cost elements and risks are other important considerations that are generally not addressed. It should then be no surprise that actual project costs often exceed the initial estimates and are delivered late and/or with a reduced scope. This paper presents a practical probabilistic cost analysis model that incorporates recent findings in human behavior and judgment under uncertainty, dependencies among cost elements, the MAIMS principle, and project management practices. Uncertain cost elements are elicited from experts using the direct fractile assessment method and fitted with three-parameter Weibull distributions. The full correlation matrix is specified in terms of two parameters that characterize correlations among cost elements in the same and in different subsystems. The analysis is readily implemented using standard Monte Carlo simulation tools such as {at}Risk and Crystal Ball{reg_sign}. The analysis of a representative design and engineering project substantiates that today's typical probabilistic cost analysis is likely to severely underestimate project cost for probability of success values of importance to contractors and procuring activities. The proposed approach provides a framework for developing a viable cost management strategy for allocating baseline budgets and contingencies. Given the scope and magnitude of the cost-overrun problem, the benefits are likely to be significant.

  1. MATRIX AND VECTOR SERVICES

    Energy Science and Technology Software Center (OSTI)

    2001-10-18

    PETRA V2 provides matrix and vector services and the ability construct, query, and use matrix and vector objects that are used and computed by TRILINOS solvers. It provides all basic matr5ix and vector operations for solvers in TRILINOS.

  2. Analytical Services Management System

    Energy Science and Technology Software Center (OSTI)

    2005-03-30

    Analytical Services Management System (ASMS) provides sample management services. Sample management includes sample planning for analytical requests, sample tracking for shipping and receiving by the laboratory, receipt of the analytical data deliverable, processing the deliverable and payment of the laboratory conducting the analyses. ASMS is a web based application that provides the ability to manage these activities at multiple locations for different customers. ASMS provides for the assignment of single to multiple samples for standardmore »chemical and radiochemical analyses. ASMS is a flexible system which allows the users to request analyses by line item code. Line item codes are selected based on the Basic Ordering Agreement (BOA) format for contracting with participating laboratories. ASMS also allows contracting with non-BOA laboratories using a similar line item code contracting format for their services. ASMS allows sample and analysis tracking from sample planning and collection in the field through sample shipment, laboratory sample receipt, laboratory analysis and submittal of the requested analyses, electronic data transfer, and payment of the laboratories for the completed analyses. The software when in operation contains business sensitive material that is used as a principal portion of the Kaiser Analytical Management Services business model. The software version provided is the most recent version, however the copy of the application does not contain business sensitive data from the associated Oracle tables such as contract information or price per line item code.« less

  3. Estimated Cost Description Determination Date:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and

  4. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Total Fee Paid FY2008 $134,832 FY2009 $142,578 FY2010 $299,878 FY2011 $169,878 Cumulative Fee Paid $747,166 Contract Period: September 2007 - October 2012 $31,885,815 C/P/E Environmental Services, LLC DE-AM09-05SR22405/DE-AT30-07CC60011/SL14 Contractor: Contract Number: Contract Type: Cost Plus Award Fee $357,223 $597,797 $894,699 EM Contractor Fee Site: Stanford Linear Accelerator Center (SLAC) Contract Name: SLAC Environmental Remediation December 2012 $1,516,646 Fee Available $208,620 Fee

  5. Facilitating Sound, Cost-Effective Federal Energy Management (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-03-01

    This fact sheet is an overview of the U.S. Department of Energy's Federal Energy Management Program (FEMP). The Federal Government, as the nation's largest energy consumer, has a tremendous opportunity and acknowledged responsibility to lead by example. The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) plays a critical role in this effort. FEMP facilitates the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. FEMP does this by focusing on the needs of its Federal customers, delivering an array of services across a variety of program areas.

  6. Mail Services | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mail Services General Information: Mail Services provides U.S. Postal Service (USPS) and ISU campus mail receiving, sorting and outbound service. This service is available for all Ames Laboratory official business. Quick Links to Schedules: Hours Pickup Delivery Stamped mail -outbound Mail to be posted/metered Campus mail to Ames Lab destinations Campus mail to Non-Ames Lab destinations Campus mail - inbound USPS mail - inbound Hours (back) The mail room in 153 Spedding is accessible to pick up

  7. Hanford 222-S Laboratory Analysis and Testing Services DE-EM0003722

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E-1 PART I - THE SCHEDULE SECTION E - INSPECTION AND ACCEPTANCE E.01 FAR 52.246-4 INSPECTION OF SERVICES - FIXED PRICE (AUG 1996)............................. E-2 E.02 FAR 52.246-5 INSPECTION OF SERVICES - COST REIMBURSEMENT (APR 1984) ....... .E-2 E.03 FAR 52.246-6 INSPECTION OF SERVICES - TIME-AND-MATERIALS AND LABOR - HOUR (MAY 2001) ...................................................................................................................... E-2 E.04 INSPECTION AND ACCEPTACE

  8. DOE Issues Final RFP for Portsmouth Support Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Issues Final RFP for Portsmouth Support Services DOE Issues Final RFP for Portsmouth Support Services December 16, 2014 - 11:03am Addthis The Department of Energy yesterday released a final request for proposals for infrastructure support services at the Portsmouth Gaseous Diffusion Plant that will be set aside for small businesses. This comes after the release of a draft RFP in early July. "A firm-fixed-price, labor hour, cost reimbursement, and indefinite delivery/indefinite quantity

  9. Quantitative evaluation of savings in outage costs by using emergency actions strategy

    SciTech Connect (OSTI)

    Akhtar, A.; Asuhaimi, A.; Shaibon, H. [Univ. Teknologi Malaysia, Johor Bharu (Malaysia); Lo, K.L. [Univ. of Strathclyde, Glasgow (United Kingdom)

    1995-12-31

    This paper presents the results of a study carried out to assess the savings in consumer outage costs that can be accrued as a result of implementing Emergency Actions Strategy. The use of Emergency Actions Strategy plays a significant role in curtailing the consumer outage costs ensuing from unreliable electric service. In order to calculate the savings in outage costs, the probabilistic framework of the frequency and duration method has been used in conjunction with emergency actions. At first, the outage costs of various consumer sectors are estimated without considering the emergency actions. Secondly, the consumer outage costs are calculated by combining the frequency and duration method, and unserved energy with the emergency actions invoked. The results of the savings in consumer outage costs that can be accrued by utilizing Emergency Actions Strategy are presented for a synthetic system. The results of the study show that substantial savings in consumer outage costs are obtained by devising and implementing emergency actions strategy in situations of capacity outages. The results are of particular relevance and utility to the underdeveloped and developing countries where capacity shortages occur quite frequently. These results also suggest the importance of emergency actions strategy for electric utilities in reducing the consumer economic losses arising from unreliable electric service.

  10. Semantic Web for Manufacturing Web Services

    SciTech Connect (OSTI)

    Kulvatunyou, Boonserm; Ivezic, Nenad

    2002-06-01

    As markets become unexpectedly turbulent with a shortened product life cycle and a power shift towards buyers, the need for methods to rapidly and cost-effectively develop products, production facilities and supporting software is becoming urgent. The use of a virtual enterprise plays a vital role in surviving turbulent markets. However, its success requires reliable and large-scale interoperation among trading partners via a semantic web of trading partners' services whose properties, capabilities, and interfaces are encoded in an unambiguous as well as computer-understandable form. This paper demonstrates a promising approach to integration and interoperation between a design house and a manufacturer by developing semantic web services for business and engineering transactions. To this end, detailed activity and information flow diagrams are developed, in which the two trading partners exchange messages and documents. The properties and capabilities of the manufacturer sites are defined using DARPA Agent Markup Language (DAML) ontology definition language. The prototype development of semantic webs shows that enterprises can widely interoperate in an unambiguous and autonomous manner; hence, virtual enterprise is realizable at a low cost.

  11. Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 139 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC06-04RL14383, Modification No. 139 Section B Page B-2 B.1 Occupational Medical Services a. This is a performance-based, cost reimbursement service contract for the rendering of Occupational Medical Services for the U. S. Department of Energy's Hanford Site. The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident

  12. Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 151 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Section B Page B-2 B.1 Occupational Medical Services a. This is a performance-based, cost reimbursement service contract for the rendering of Occupational Medical Services for the U. S. Department of Energy's Hanford Site. The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident to, performing in an efficient and

  13. Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 153 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Section B Page B-2 B.1 Occupational Medical Services a. This is a performance-based, cost reimbursement service contract for the rendering of Occupational Medical Services for the U. S. Department of Energy's Hanford Site. The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident to, performing in an efficient and

  14. The importance of combined cycle generating plants in integrating large levels of wind power generation

    SciTech Connect (OSTI)

    Puga, J. Nicolas

    2010-08-15

    Integration of high wind penetration levels will require fast-ramping combined cycle and steam cycles that, due to higher operating costs, will require proper pricing of ancillary services or other forms of compensation to remain viable. Several technical and policy recommendations are presented to help realign the generation mix to properly integrate the wind. (author)

  15. 2010 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

    2012-04-01

    This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions, and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

  16. 2010 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

    2012-04-01

    This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

  17. WIPP - Cost of a FOIA request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cost of a Freedom of Information Act (FOIA) request The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a...

  18. Costs Associated With Propane Vehicle Fueling Infrastructure

    SciTech Connect (OSTI)

    Smith, M.; Gonzales, J.

    2014-08-01

    This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

  19. Costs Associated With Propane Vehicle Fueling Infrastructure

    SciTech Connect (OSTI)

    Smith, M.; Gonzales, J.

    2014-08-05

    This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

  20. NREL Reports Soft Costs Now Largest Piece of Solar Installation Total Cost

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - News Releases | NREL Reports Soft Costs Now Largest Piece of Solar Installation Total Cost December 2, 2013 Two detailed reports from the Energy Department's National Renewable Energy Laboratory (NREL) find that solar financing and other non-hardware costs - often referred to as "soft costs" - now comprise up to 64% of the total price of residential solar energy systems, reflecting how soft costs are becoming an increasingly larger fraction of the cost of installing solar.

  1. Evolving Utility Cost-Effectiveness Test Criteria

    Broader source: Energy.gov [DOE]

    Presents an overview of tests done to evaluate the cost-effectiveness of energy efficiency program benefits.

  2. Biotrans: Cost Optimization Model | Open Energy Information

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentbiotrans-cost-optimization-model,http Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration &...

  3. Cost Analysis: Technology, Competitiveness, Market Uncertainty | Department

    Office of Environmental Management (EM)

    of Energy Technology to Market » Cost Analysis: Technology, Competitiveness, Market Uncertainty Cost Analysis: Technology, Competitiveness, Market Uncertainty As a basis for strategic planning, competitiveness analysis, funding metrics and targets, SunShot supports analysis teams at national laboratories to assess technology costs, location-specific competitive advantages, policy impacts on system financing, and to perform detailed levelized cost of energy (LCOE) analyses. This shows the

  4. AskIT Service Desk Support Value Model

    SciTech Connect (OSTI)

    Ashcraft, Phillip Lynn; Cummings, Susan M.; Fogle, Blythe G.; Valdez, Christopher D.

    2015-08-07

    The value model discussed herein provides an accurate and simple calculation of the funding required to adequately staff the AskIT Service Desk (SD).  The model is incremental – only technical labor cost is considered.  All other costs, such as management, equipment, buildings, HVAC, and training are considered common elements of providing any labor related IT Service. Depending on the amount of productivity loss and the number of hours the defect was unresolved, the value of resolving work from the SD is unquestionably an economic winner; the average cost of $16 per SD resolution can commonly translate to cost avoidance exceeding well over $100. Attempting to extract too much from the SD will likely create a significant downside. The analysis used to develop the value model indicates that the utilization of the SD is very high (approximately 90%).  As a benchmark, consider a comment from a manager at Vitalyst (a commercial IT service desk) that their utilization target is approximately 60%.  While high SD utilization is impressive, over the long term it is likely to cause unwanted consequences to staff such as higher turnover, illness, or burnout.  A better solution is to staff the SD so that analysts have time to improve skills through training, develop knowledge, improve processes, collaborate with peers, and improve customer relationship skills.

  5. water service provider

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    service provider - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  6. Method of servicing wellbores

    SciTech Connect (OSTI)

    Pasztor, A.J.; Stauffer, R.C.

    1981-12-08

    The servicing of wellbores with a high density fluid to maintain an elevated pressure on a portion of the formation penetrated by the well is improved. The improvement comprises injecting as the high density fluid a substantially solids-free aqueous solution of calcium bromide and zinc bromide having a density of at least about 15 pounds per gallon. The aqueous solution is prepared by reacting hydrogen bromide with zinc or compounds of zinc in the presence of an aqueous calcium bromide solution.

  7. Method of servicing wellbores

    SciTech Connect (OSTI)

    Stauffer, R. C.; Pasztor, A. J.

    1984-12-25

    The servicing of wellbores with a high density fluid to maintain an elevated pressure on a portion of the formation penetrated by the well is improved. The improvement comprises injecting as the high density fluid a substantially solids-free aqueous solution of calcium bromide and zinc bromide having a density of at least about 15 pounds per gallon. The aqueous solution is prepared by reacting hydrogen bromide with zinc or compounds of zinc in the presence of an aqueous calcium bromide solution.

  8. Cloud Computing Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computing Services - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  9. ARMY SERVICE FORCES

    Office of Legacy Management (LM)

    ARMY SERVICE FORCES ' -, 1 MANHATTAN ENGINEER DISTRICT --t 4 IN "LPLI RC,' LR io EIDM CIS INTELLIGENCE AND SECURITY DIVISION CHICAGO BRANCH OFFICE i ., -,* - P. 0. Box 6770-A I ' 1 .' CHICAGO 80. ILLINOIS /lvb 15 February 1945 Subject: shipment Security Survey at &Uinckrodt Chemical Works. MEMORANDUM to the Officer in Charge. 1. The Mallinckrodt Chemical Works, St. Louis, Missouri, was contacted by the undersigned on 16 November 1944, for the purpose of -king an investigation to

  10. Renewable Portfolio Standards: Costs and Benefits (Poster)

    SciTech Connect (OSTI)

    Bird, L.; Heeter, J.; Barbose, G.; Weaver, S.; Flores, F.; Kuskova-Burns, K.; Wiser, R.

    2014-10-01

    This report summarizes state-level RPS costs to date, and considers how those costs may evolve going forward given scheduled increases in RPS targets and cost containment mechanisms. The report also summarizes RPS benefits estimates, based on published studies for individual states and discusses key methodological considerations.

  11. Sustainable Alternative Fuels Cost Workshop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alternative Fuels Cost Workshop Tuesday, November 27, 2012 9:00 a.m. - 4:00 p.m. National Renewable Energy Lab Offices - Suite 930 901 D Street, SW, Washington, DC 20585 AGENDA 9:00 a.m.-9:15 a.m. Introduction 9:15 a.m.-9:45 a.m. Participant Introductions 9:45 a.m.-10:15 a.m. New Pathways - Alicia Lindauer, DOE 10:15 a.m.-10:45 a.m. Biochemical Conversion Processes - Mary Biddy, NREL 10:45 a.m.-11:15 a.m. Thermochemical Conversion Processes - Johnathan Holladay, PNNL 11:15 a.m.-11:45 a.m. Algae

  12. United States Forest Service - Forest Service NEPA Procedures...

    Open Energy Info (EERE)

    and Guidance Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: United States Forest Service - Forest Service NEPA Procedures and Guidance Abstract This...

  13. Concentrating Solar Power Services CSP Services | Open Energy...

    Open Energy Info (EERE)

    providing consulting, due diligence and component testing for Solar Thermal Electricity Generation (STEG). References: Concentrating Solar Power Services (CSP...

  14. 2013 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Mone, C.; Smith, A.; Maples, B.; Hand, M.

    2015-02-01

    This report uses representative project types to estimate the levelized cost of wind energy (LCOE) in the United States for 2013. Scheduled to be published on an annual basis, it relies on both market and modeled data to maintain a current understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed from this analysis are used to inform wind technology cost projections, goals, and improvement opportunities.

  15. Microsoft Word - cost study manual final 06 25 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost

  16. Low-cost inertial measurement unit.

    SciTech Connect (OSTI)

    Deyle, Travis Jay

    2005-03-01

    Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

  17. 2006 Update of Business Downtime Costs

    SciTech Connect (OSTI)

    Hinrichs, Mr. Doug; Goggin, Mr. Michael

    2007-01-01

    The objective of this paper is to assess the downtime cost of power outages to businesses in the commercial and industrial sectors, updating and improving upon studies that have already been published on this subject. The goal is to produce a study that, relative to existing studies, (1) applies to a wider set of business types (2) reflects more current downtime costs, (3) accounts for the time duration factor of power outages, and (4) includes data on the costs imposed by real outages in a well-defined market. This study examines power outage costs in 11 commercial subsectors and 5 industrial subsectors, using data on downtime costs that was collected in the 1990's. This study also assesses power outage costs for power outages of 20 minutes, 1 hour, and 4 hours duration. Finally, this study incorporates data on the costs of real power outages for two business subsectors. However, the current limited state of data availability on the topic of downtime costs means there is room to improve upon this study. Useful next steps would be to generate more recent data on downtime costs, data that covers outages shorter than 20 minutes duration and longer than 4 hours duration, and more data that is based on the costs caused by real-world outages. Nevertheless, with the limited data that is currently available, this study is able to generate a clear and detailed picture of the downtime costs that are faced by different types of businesses.

  18. Power Services Site Navigation Menus

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links for that menu. This page can be accessed via keyboard from other pages on the Power Services web site (access key N). Menu Names: About Power Services | News & Events |...

  19. Copy Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Copy Services Copy Services The Copier Management Team is here to make sure your copier needs are met. Our products and services include: Acquisition of New and Replacement Copiers Copier Maintenance/Repairs Copier Relocation Monthly Working Capital Fund Billing Reports Copier supplies Other services include needs assessment analysis to determine workload and most appropriate equipment to: Perform acquisition activities on behalf of program customers. Negotiation of equipment trade-in allowance

  20. Employee Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Employee Services The Office of Management provides many of the services that keep the Department of Energy Headquarters offices operational. These services keep the Department's facilities operating, as well as many of the managerial support functions that are shared by many of the Program Offices. These functions are primarily provided by the Office of Administration, MA-40. For a listing of office contacts please use the About Us menu, the Contact Us section, available directly

  1. Project Funding Catalog of Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Funding Catalog of Services The U.S. Department of Energy Federal Energy Management Program February 2015 Project Funding Catalog of Services Contacts Contacts Patrick Shipp FEMP 1000 Independence Ave SW Washington, DC 20585 E-mail: patrick.shipp@ee.doe.gov Project Funding Catalog of Services Table of Contents Contents Contents ........................................................................................................................................................ i

  2. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect (OSTI)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  3. Data ID Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ID Service First DOI for a DOE dataset was minted by OSTI and registered with DataCite on 8/10/2011 from the DOE Atmospheric Radiation Measurement (ARM) Climate Research Facility at Oak Ridge National Laboratory http://dx.doi.org/10.5439/1021460 Disseminate Our Results: "Our success should be measured not when a project is completed or an experiment concluded, but when scientifc and technical information is disseminated. Beyond broad availability of technical reports, e-prints and

  4. ESnet's LHCONE Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESnet's LHCONE Service March 23 rd 2015 Presented by Jason Zurawski, zurawski@es.net Science Engagement Authored by Joe Metzger metzger@es.net Network Engineering What is LHCONE? LHCONE is a Global Science Overlay Network designed for high performance science workflows and dedicated to the HEP community. * LHCONE provides access to HEP Computing Resources at: * LHC Tier 1, and Tier 2 and Tier 3 Centers * Belle II Tier 1 Centers (KEK & PNNL) and Tier 2 centers * Non-science resources are NOT

  5. Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements

    SciTech Connect (OSTI)

    Custer, W.R. Jr.; Messick, C.D.

    1996-03-31

    This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

  6. Microsoft Word - CR-091 Primary Basis of Cost Savings and Cost Savings Amount Custom Fields

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CR-091 Primary Basis of Cost Savings and Cost Savings Amount Custom Fields Primary Basis of Cost Savings and Cost Savings Amount Custom Fields Background On August 29 th , 2013 the PSWG approved Change Request 091 which adds two new custom fields to STRIPES. The names of the fields are Primary Basis of Cost Savings and Cost Saving Amount. The purpose of these fields is to allow DOE to capture Cost Savings documented at time of award and the subsequent reporting capability of this data via IDW.

  7. Development of a Low-Cost Rotary Steerable Drilling System

    SciTech Connect (OSTI)

    Roney Nazarian

    2012-01-31

    The project had the goal to develop and commercialize a low-cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures to reduce operating costs by a minimum of 50% and lost-in-hole charges by at least 50% over the currently offered systems. The LCRSS system developed under this project does reduce operating costs by 55% and lost-in-hole charges by at least 50%. The developed product is not commercializable in its current form. The overall objective was to develop and commercialize a low cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures (20,000 psi/150 C) while reducing the operating costs by 50% and the lost-in-hole charges by 50% over the currently available systems. The proposed reduction in costs were to be realized through the significant reduction in tool complexity, a corresponding increase in tool reliability as expressed in the mean-time between failure (MTBF), and a reduction in the time and costs required to service tools after each field operation. Ultimately, the LCRSS system was to be capable of drilling 7 7/8 in. to 9 5/8 in. borehole diameters. The project was divided into three Phases, of which Phases I & II were previously completed and reported on, and are part of the case file. Therefore, the previously reported information is not repeated herein. Phase III included the fabrication of two field ready prototypes that were to be subjected to a series of drilling tests at GTI Catoosa, DOE RMOTC, and at customer partnering wells, if possible, as appropriate in the timing of the field test objectives to fully exercise all elements of the LCRSS. These tests were conducted in an iterative process based on a performance/reliability improvement cycle with the goal of demonstrating the system met all aspects required for commercial viability. These tests were conducted to achieve continuous runs of 100+ hours with well trajectories that fully exercised the tool's build/turn/drop/hold target capabilities and its higher end ratings for bit weight, torque and rotary speed. The tool teardowns were rigorously analyzed at the conclusion of each field run to assess component wear rates and to fully document any detrimental behavior(s) observed.

  8. Cost Contributors to Geothermal Power Production

    SciTech Connect (OSTI)

    Nathwani, Jay; Mines, Greg

    2011-07-01

    The US Department of Energy Geothermal Technologies Office (DOE-GTO) has developed the tool Geothermal Electricity Technologies Evaluation Model (GETEM) to assess the levelized cost of electricity (LCOE) of power produced from geothermal resources. Recently modifications to GETEM allow the DOE-GTO to better assess how different factors impact the generation costs, including initial project risk, time required to complete a development, and development size. The model characterizes the costs associated with project risk by including the costs to evaluate and drill those sites that are considered but not developed for commercial power generation, as well as to assign higher costs to finance those activities having more risk. This paper discusses how the important parameters impact the magnitude project costs for different project scenarios. The cost distributions presented include capital cost recovery for the exploration, confirmation, well field completion and power plant construction, as well as the operation and maintenance (O&M) costs. The paper will present these cost distributions for both EGS and hydrothermal resources.

  9. GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process

    Office of Environmental Management (EM)

    GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process Step Description Associated task 1 Define estimate's purpose Determine estimate's purpose, required level of detail, and overall scope; Determine who will receive the estimate 2 Develop estimating plan Determine the cost estimating team and develop its master schedule; Determine who will do the independent cost estimate; Outline the cost estimating approach; Develop the estimate timeline 3 Define

  10. Building Technologies Program: Tax Deduction Qualified Software Â… Green Building Studio Web Service version 3.1

    Broader source: Energy.gov [DOE]

    Provides required documentation that Green Building Studio Web Service version 3.1 meets Internal Revenue Code §179D, Notice 2006-52, dated June 2, 2006, for calculating commercial building energy and power cost savings.

  11. Assessment of the Economic Potential of Microgrids for Reactive Power Supply

    SciTech Connect (OSTI)

    Appen, Jan von; Marnay, Chris; Stadler, Michael; Momber, Ilan; Klapp, David; Scheven, Alexander von

    2011-05-01

    As power generation from variable distributed energy resources (DER) grows, energy flows in the network are changing, increasing the requirements for ancillary services, including voltage support. With the appropriate power converter, DER can provide ancillary services such as frequency control and voltage support. This paper outlines the economic potential of DERs coordinated in a microgrid to provide reactive power and voltage support at its point of common coupling. The DER Customer Adoption Model assesses the costs of providing reactive power, given local utility rules. Depending on the installed DER, the cost minimizing solution for supplying reactive power locally is chosen. Costs include the variable cost of the additional losses and the investment cost of appropriately over-sizing converters or purchasing capacitors. A case study of a large health care building in San Francisco is used to evaluate different revenue possibilities of creating an incentive for microgrids to provide reactive power.

  12. Materials and Transportation Services | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Materials and Transportation Services General Information: Materials and Transportation Services provides Ames Laboratory employees with a wide array of services and support activities. Select a service listed below to learn more about contacts, schedules and regulatory information. Shipping and Receiving Hazardous Materials Transportation Storeroom Services Storeroom Catalog Mail Services Express Package Shipping Service Precious Metals Fleet Vehicles

  13. Update on Service Management project

    ScienceCinema (OSTI)

    None

    2011-04-25

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS&IT; Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS&IT; Service Management Teams Reinoud Martens, Mats Moller

  14. Fish and Wildlife Service | Open Energy Information

    Open Energy Info (EERE)

    Wildlife Service Jump to: navigation, search Logo: Fish and Wildlife Service Name: Fish and Wildlife Service Place: Washington, DC Year Founded: 1940 Phone Number: (303) 275-2370...

  15. International Nuclear Services Ltd | Open Energy Information

    Open Energy Info (EERE)

    Nuclear Services Ltd Jump to: navigation, search Name: International Nuclear Services Ltd Place: Cheshire, England, United Kingdom Zip: WA3 6AS Sector: Services Product:...

  16. Enforcement Letter, Skookum Contract Services | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Skookum Contract Services Enforcement Letter, Skookum Contract Services June 12, 2015 Worker Safety and Health Enforcement Letter issued to Skookum Contract Services On June 12, ...

  17. Energy Efficiency Services Ltd | Open Energy Information

    Open Energy Info (EERE)

    Services Ltd Jump to: navigation, search Name: Energy Efficiency Services Ltd Place: Delhi (NCT), India Sector: Efficiency, Services Product: Delhi-based joint venture formed to...

  18. Tiger Energy Services Inc | Open Energy Information

    Open Energy Info (EERE)

    Services Inc Jump to: navigation, search Name: Tiger Energy Services Inc. Place: Signal Hill, California Zip: 90755 Sector: Geothermal energy, Services Product: US-based...

  19. Williams Energy Services | Open Energy Information

    Open Energy Info (EERE)

    Energy Services Jump to: navigation, search Name: Williams Energy Services Place: Tulsa, OK Website: www.williamsenergyservices.com References: Williams Energy Services1...

  20. Aecom Government Services AGS | Open Energy Information

    Open Energy Info (EERE)

    Zip: 76102 Sector: Renewable Energy, Services Product: Texas-based government services arm of AECOM. The entity offers engineering services to the renewable energy sector....

  1. National Park Service | Open Energy Information

    Open Energy Info (EERE)

    Service Jump to: navigation, search Logo: National Park Service Name: National Park Service Address: 1849 C Street NW Place: Washington, District of Columbia Zip: 20240 Year...

  2. Hermes Energy Services | Open Energy Information

    Open Energy Info (EERE)

    Hermes Energy Services Jump to: navigation, search Name: Hermes Energy Services Place: Dursley, United Kingdom Sector: Services Year Founded: 2007 Website: www.hermesenergyservices...

  3. About Power Services (pbl/main)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Power Services Power Home Page Other Related Web Sites Power Services Organization Power Services Financial Information Tribal Affairs Office Account Executives Customer...

  4. Property:Test Services | Open Energy Information

    Open Energy Info (EERE)

    Test Services Jump to: navigation, search Property Name Test Services Property Type String Pages using the property "Test Services" Showing 25 pages using this property. (previous...

  5. Power Services Financial Information (pbl/about)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Related Web Sites Power Services Organization Power Services Financial Information Net Revenue Sounding Board Tribal Affairs Office Account Executives Customer Service Centers...

  6. Excepted Service Authorities | Department of Energy

    Office of Environmental Management (EM)

    Excepted Service Authorities Excepted Service Authorities Excepted Service Authorities for EJ and EK Pay Plans EJ and EK Pay plans are unique to DOE. They were established under:...

  7. Providence Financial Services Ltd | Open Energy Information

    Open Energy Info (EERE)

    Financial Services Ltd Jump to: navigation, search Name: Providence Financial Services Ltd Place: Stanford, Connecticut Sector: Biomass, Renewable Energy, Services Product:...

  8. Enertech Marketing Services | Open Energy Information

    Open Energy Info (EERE)

    Enertech Marketing Services Jump to: navigation, search Name: Enertech Marketing Services Place: Bangalore, Karnataka, India Zip: 560041 Sector: Services, Solar Product: Enertech...

  9. Low Cost Durable Seal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Durable Seal Low Cost Durable Seal Part of a $100 million fuel cell award announced by DOE Secretary Bodman on Oct. 25, 2006. PDF icon 4_utc.pdf More Documents & Publications Low Cost, Durable Seal 2012 Pathways to Commercial Success: Technologies and Products Supported by the Fuel Cell Technologies Program 2011 Pathways to Commercial Success: Technologies and Products Supported by the Fuel Cell Technologies Program

  10. Low Cost Heliostat Development | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low Cost Heliostat Development Low Cost Heliostat Development This presentation was delivered at the SunShot Concentrating Solar Power (CSP) Program Review 2013, held April 23-25, 2013 near Phoenix, Arizona. PDF icon csp_review_meeting_042513_blackmon.pdf More Documents & Publications Next Generation Solar Collectors for CSP - FY13 Q1 Low-Cost Heliostat for Modular Systems - FY13 Q1 Next-Generation Solar Collectors for CSP - FY13 Q2

  11. Addressing Deferred Maintenance, Infrastructure Costs, and Excess

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facilities at Portsmouth and Paducah | Department of Energy Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Presentation from the 2015 DOE National Cleanup Workshop by William E. Murphie, Manager, Portsmouth/Paducah Project Office (PPPO). PDF icon Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth

  12. Clean distributed generation performance and cost analysis

    SciTech Connect (OSTI)

    None, None

    2004-04-01

    This assessment examined the performance, cost, and timing of ultra-low emissions CHP technologies driven by certain air quality regions in the U.S.

  13. Wind Turbine Design Cost and Scaling Model

    SciTech Connect (OSTI)

    Fingersh, L.; Hand, M.; Laxson, A.

    2006-12-01

    This model intends to provide projections of the impact on cost from changes in economic indicators such as the Gross Domestic Product and Producer Price Index.

  14. Benchmarking for Cost Improvement. Final report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The US Department of Energy`s (DOE) Office of Environmental Restoration and Waste Management (EM) conducted the Benchmarking for Cost Improvement initiative with three objectives: Pilot test benchmarking as an EM cost improvement tool; identify areas for cost improvement and recommend actions to address these areas; provide a framework for future cost improvement. The benchmarking initiative featured the use of four principal methods (program classification, nationwide cost improvement survey, paired cost comparison and component benchmarking). Interested parties contributed during both the design and execution phases. The benchmarking initiative was conducted on an accelerated basis. Of necessity, it considered only a limited set of data that may not be fully representative of the diverse and complex conditions found at the many DOE installations. The initiative generated preliminary data about cost differences and it found a high degree of convergence on several issues. Based on this convergence, the report recommends cost improvement strategies and actions. This report describes the steps taken as part of the benchmarking initiative and discusses the findings and recommended actions for achieving cost improvement. The results and summary recommendations, reported below, are organized by the study objectives.

  15. Updated Cost Analysis of Photobiological Hydrogen Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Updated Cost Analysis of Photobiological Hydrogen Production from Chlamydomonas reinhardtii Green Algae: Milestone Completion Report This report updates the 1999 economic analysis ...

  16. 2014 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Mone, Christopher; Stehly, Tyler; Maples, Ben; Settle, Edward

    2015-10-01

    This report uses representative commercial projects to estimate the levelized cost of energy (LCOE) for both land-based and offshore wind plants in the United States for 2014. Scheduled to be published on an annual basis, the analysis relies on both market and modeled data to maintain an up-to-date understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed by the National Renewable Energy Laboratory (NREL) are used in this analysis to inform wind technology cost projections, goals, and improvement opportunities.

  17. Cost Recovery | OpenEI Community

    Open Energy Info (EERE)

    Cost Recovery Home Kyoung's picture Submitted by Kyoung(150) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations...

  18. Cost Mechanisms | OpenEI Community

    Open Energy Info (EERE)

    Cost Mechanisms Home Kyoung's picture Submitted by Kyoung(150) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations...

  19. Cost Effectiveness of Electricity Energy Efficiency Programs...

    Open Energy Info (EERE)

    Effectiveness of Electricity Energy Efficiency Programs Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Cost Effectiveness of Electricity Energy Efficiency Programs...

  20. Controller (Cost Compliance and Financial Reporting) | Princeton...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GAAP, Cost Accounting Standards and internal controls required. Excellent analytical and problem solving skills Knowledge of DOE reporting requirements and prior Laboratory or...

  1. Aerogel commercialization: Technology, markets and costs

    SciTech Connect (OSTI)

    Carlson, G.; Lewis, D.; McKinley, K.; Richardson, J.; Tillotson, T.

    1994-10-07

    Commercialization of aerogels has been slow due to several factors including cost and manufacturability issues. The technology itself is well enough developed as a result of work over the past decade by an international-community of researchers. Several extensive substantial markets appear to exist for aerogels as thermal and sound insulators, if production costs can keep prices in line with competing established materials. The authors discuss here the elements which they have identified as key cost drivers, and they give a prognosis for the evolution of the technology leading to reduced cost aerogel production.

  2. Modified Accelerated Cost-Recovery System (MACRS)

    Broader source: Energy.gov [DOE]

    Under the federal Modified Accelerated Cost-Recovery System (MACRS), businesses may recover investments in certain property through depreciation deductions. The MACRS establishes a set of class...

  3. Hydrogen Compression, Storage, and Dispensing Cost Reduction...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications 2013 Hydrogen Compression, Storage, and Dispensing Cost Reduction Workshop Final Report Storage - Challenges and Opportunities Hydro-Pac Inc., A High Pressure Company

  4. Interruption Cost Estimate Calculator | Open Energy Information

    Open Energy Info (EERE)

    Cost Estimate (ICE) Calculator This calculator is a tool designed for electric reliability planners at utilities, government organizations or other entities that are...

  5. Cutting Biofuel Production Costs | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cutting Biofuel Production Costs Working to use sunlight to convert biomass to biofuels, ... bioderived alcohols to benzaldehyde, toluene, and the zero-emission biofuel hydrogen. ...

  6. Watt Does It Cost To Use It?

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Students learn how electrical usage is counted and priced. They measure and evaluate energy use and cost of representative household and school electrical items.

  7. Backup Power Cost of Ownership Analysis and Incumbent Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Backup Power Cost of Ownership Analysis and Incumbent Technology Comparison Backup Power Cost of Ownership Analysis and Incumbent Technology Comparison This cost of ownership...

  8. Table 1. Real Average Transportation and Delivered Costs of Coal...

    U.S. Energy Information Administration (EIA) Indexed Site

    Real Average Transportation and Delivered Costs of Coal, By Year and Primary Transport Mode" "Year","Average Transportation Cost of Coal (Dollars per Ton)","Average Delivered Cost...

  9. Cost Estimating Handbook for Environmental Restoration

    SciTech Connect (OSTI)

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  10. Products and Services Purchased | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    waste management services Professional and administrative services Engineering support services Research & development Information technology Construction materials and services...

  11. MOX Services Unclassified Information System PIA, National Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MOX Services Unclassified Information System PIA, National Nuclear Services Administration MOX Services Unclassified Information System PIA, National Nuclear Services ...

  12. Technical Assistance to ISO's and Grid Operators For Loads Providing

    Energy Savers [EERE]

    Ancillary Services To Enhance Grid Reliability | Department of Energy Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Project demonstrates and promotes the use of responsive load to provide ancillary services; helps ISOsand grid operators understand the resource and how best to apply it. PDF icon Technical

  13. Nuclear Transportation Management Services | Department of Energy

    Office of Environmental Management (EM)

    Transportation Management Services Nuclear Transportation Management Services PDF icon Nuclear Transportation Management Services More Documents & Publications Transportation and Program Management Services Pueblo de San Ildefonso Shoshone-Bannock Tribes

  14. Financial sustainability in municipal solid waste management – Costs and revenues in Bahir Dar, Ethiopia

    SciTech Connect (OSTI)

    Lohri, Christian Riuji Camenzind, Ephraim Joseph ZurbrĂĽgg, Christian

    2014-02-15

    Highlights: • Cost-revenue analysis over 2 years revealed insufficient cost-recovery. • Expenses for motorized secondary collection increased by 82% over two years. • Low fee collection rate and reliance on only one revenue stream are problematic. • Different options for cost reduction and enhanced revenue streams are recommended. • Good public–private alliance is crucial to plan and implement improvement measures. - Abstract: Providing good solid waste management (SWM) services while also ensuring financial sustainability of the system continues to be a major challenge in cities of developing countries. Bahir Dar in northwestern Ethiopia outsourced municipal waste services to a private waste company in 2008. While this institutional change has led to substantial improvement in the cleanliness of the city, its financial sustainability remains unclear. Is the private company able to generate sufficient revenues from their activities to offset the costs and generate some profit? This paper presents a cost-revenue analysis, based on data from July 2009 to June 2011. The analysis reveals that overall costs in Bahir Dar’s SWM system increased significantly during this period, mainly due to rising costs related to waste transportation. On the other hand, there is only one major revenue stream in place: the waste collection fee from households, commercial enterprises and institutions. As the efficiency of fee collection from households is only around 50%, the total amount of revenues are not sufficient to cover the running costs. This results in a substantial yearly deficit. The results of the research therefore show that a more detailed cost structure and cost-revenue analysis of this waste management service is important with appropriate measures, either by the privates sector itself or with the support of the local authorities, in order to enhance cost efficiency and balance the cost-revenues towards cost recovery. Delays in mitigating the evident financial deficit could else endanger the public-private partnership (PPP) and lead to failure of this setup in the medium to long term, thus also endangering the now existing improved and currently reliable service. We present four options on how financial sustainability of the SWM system in Bahir Dar might be enhanced: (i) improved fee collection efficiency by linking the fees of solid waste collection to water supply; (ii) increasing the value chain by sales of organic waste recycling products; (iii) diversifying revenue streams and financing mechanisms (polluter-pays-, cross-subsidy- and business-principles); and (iv) cost reduction and improved cost-effectiveness. We argue that in a PPP setup such as in Bahir Dar, a strong alliance between the municipality and private enterprise is important so that appropriate solutions for improved financial sustainability of a SWM system can be sought and implemented.

  15. Draft Submission; Social Cost of Energy Generation

    SciTech Connect (OSTI)

    1990-01-05

    This report is intended to provide a general understanding of the social costs associated with electric power generation. Based on a thorough review of recent literature on the subject, the report describes how these social costs can be most fully and accurately evaluated, and discusses important considerations in applying this information within the competitive bidding process. [DJE 2005

  16. NPR (New Production Reactor) capacity cost evaluation

    SciTech Connect (OSTI)

    1988-07-01

    The ORNL Cost Evaluation Technical Support Group (CETSG) has been assigned by DOE-HQ Defense Programs (DP) the task defining, obtaining, and evaluating the capital and life-cycle costs for each of the technology/proponent/site/revenue possibilities envisioned for the New Production Reactor (NPR). The first part of this exercise is largely one of accounting, since all NPR proponents use different accounting methodologies in preparing their costs. In order to address this problem of comparing ''apples and oranges,'' the proponent-provided costs must be partitioned into a framework suitable for all proponents and concepts. If this is done, major cost categories can then be compared between concepts and major cost differences identified. Since the technologies proposed for the NPR and its needed fuel and target support facilities vary considerably in level of technical and operational maturity, considerable care must be taken to evaluate the proponent-derived costs in an equitable manner. The use of cost-risk analysis along with derivation of single point or deterministic estimates allows one to take into account these very real differences in technical and operational maturity. Chapter 2 summarizes the results of this study in tabular and bar graph form. The remaining chapters discuss each generic reactor type as follows: Chapter 3, LWR concepts (SWR and WNP-1); Chapter 4, HWR concepts; Chapter 5, HTGR concept; and Chapter 6, LMR concept. Each of these chapters could be a stand-alone report. 39 refs., 36 figs., 115 tabs.

  17. PAFC Cost Challenges | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Challenges PAFC Cost Challenges Presentation at the MCFC and PAFC R&D Workshop held Nov. 16, 2009, in Palm Springs, CA PDF icon mcfc_pafc_workshop_kanuri.pdf More Documents & Publications MCFC and PAFC R&D Workshop Summary Report High Temperature Fuel Cell (Phosphoric Acid) Manufacturing R&D PAFC History and Successes

  18. PHEV Battery Cost Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon es111_gallagher_2012_o.pdf More Documents & Publications Promises and Challenges of Lithium- and Manganese-Rich Transition-Metal Layered-Oxide Cathodes PHEV Battery Cost Assessment EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects

  19. PHEV Battery Cost Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C. PDF icon es001_barnett_2010_o.pdf More Documents & Publications PHEV Battery Cost Assessment PHEV and LEESS Battery Cost Assessment PHEV

  20. Cost Codes and the Work Breakdown Structure

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The chapter discusses the purpose of the work breakdown structure (WBS) and code of account (COA) cost code system, shows the purpose and fundamental structure of both the WBS and the cost code system, and explains the interface between the two systems.

  1. Renewable Energy Catalog of Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalog of Services The U.S. Department of Energy Federal Energy Management Program March 2015 Renewable Energy Catalog of Services Contacts Contacts Jesse Gary FEMP 1000 Independence Ave SW Washington, DC 20585 E-mail: jesse.gary@ee.doe.gov Patrick Shipp FEMP 1000 Independence Ave SW Washington, DC 20585 E-mail: patrick.shipp@ee.doe.gov Renewable Energy Catalog of Services Table of Contents Contents Executive Summary

  2. About the Senior Executive Service

    Broader source: Energy.gov [DOE]

    The Senior Executive Service (SES) was established by Title IV of the Civil Service Reform Act (CSRA) of 1978 [P.L. 95-454, October 13, 1978] and became effective on July 13, 1979. The CSRA envisioned a Senior Executive Service whose members shared values, a broad perspective of Government, and solid executive skills. Members of a “corporate SES” respected and embraced the dynamics of American democracy - an approach to governance that provided a continuing vehicle for change.

  3. Transportation and Program Management Services

    Office of Environmental Management (EM)

    Atlanta, Georgia Transportation and Program Management Services Secured Transportation Services, LLC Founded: December, 2003 ff Staff: 7 Experience: Over 145 years combined experience in Nuclear Transportation, Security, HP & Operations Services Transportation The largest Transportation Coordinators of Spent Nuclear Fuel in North America On-Site, Hands-On Assistance (Before & During both Loading & Transport) P d A i t (W iti d/ R i ) Procedure Assistance (Writing and/or Review)

  4. IT Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IT Services IT Services banner-909710_960_720.jpg Transform, Protect, and Advance - DOE's IT Modernization Strategy The White House Digital Government Strategy lays a strong foundation for government-wide technology modernization. In response, the Department has established 10 key objectives that will Transform, Protect, and Advance the IT ecosystem of the future, including: Enabling hybrid cloud computing to connect networks and services Establishing cybersecurity policy Deploying enterprise

  5. Procurement Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement Services Procurement Services Headquarters Services DOING BUSINESS WITH HEADQUARTERS Electronic Business Innovation - The second (2nd) generation of a secure, web-enabled system, the Strategic Integrated Procurement Enterprise System (STRIPES), was implemented in April 2008. STRIPES can accomodate procurement and financial assistance transactions at all dollar values. STRIPES (internal interface) and FedConnect.net (external interface) provides for the posting of solicitations,

  6. The cost of wetland creation and restoration. Final report, [February 12, 1992--April 30, 1994]- Draft

    SciTech Connect (OSTI)

    King, D.; Costanza, R.

    1994-07-11

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  7. Nuclear plant cancellations: causes, costs, and consequences

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This study was commissioned in order to help quantify the effects of nuclear plant cancellations on the Nation's electricity prices. This report presents a historical overview of nuclear plant cancellations through 1982, the costs associated with those cancellations, and the reasons that the projects were terminated. A survey is presented of the precedents for regulatory treatment of the costs, the specific methods of cost recovery that were adopted, and the impacts of these decisions upon ratepayers, utility stockholders, and taxpayers. Finally, the report identifies a series of other nuclear plants that remain at risk of canellation in the future, principally as a result of similar demand, finance, or regulatory problems cited as causes of cancellation in the past. The costs associated with these potential cancellations are estimated, along with their regional distributions, and likely methods of cost recovery are suggested.

  8. US Forest Service | Open Energy Information

    Open Energy Info (EERE)

    US Forest Service Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleUSForestService&oldid442004...

  9. Workplace Charging Challenge Partner: Bosch Automotive Service...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bosch Automotive Service Solutions, Inc. Workplace Charging Challenge Partner: Bosch Automotive Service Solutions, Inc. Workplace Charging Challenge Partner: Bosch Automotive...

  10. Coordinating Energy Efficiency With Water Conservation Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Coordinating Energy Efficiency With Water Conservation Services Coordinating Energy Efficiency With Water Conservation Services Better Buildings Residential Network Program ...

  11. Sun Service | Open Energy Information

    Open Energy Info (EERE)

    Sector: Renewable Energy Product: Renewable Energy System Consulting and Design, Photovoltaic installation, Design of Passive Houses and LED Lighting References: Sun Service1...

  12. ORISE: Radiological program assessment services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiological program assessment services Minimizing the risk of human exposure to hazardous levels of radioactive materials requires designing a comprehensive safety program that...

  13. Food Service | Open Energy Information

    Open Energy Info (EERE)

    Building Types 1 References EIA CBECS Building Types U.S. Energy Information Administration (Oct 2008) Retrieved from "http:en.openei.orgwindex.php?titleFoodService&old...

  14. Ombuds Services for Technology Transfer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ombuds Program Tech Transfer Ombuds Ombuds Services for Technology Transfer Committed to the fair and equitable treatment of all employees, contractors, and persons doing...

  15. SF6432-CS Commercial Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with the Directorate of Defense Trade Control : SF 6432-CS Title: Standard Terms and Conditions for Commercial Services Owner: Procurement Policy & Quality Dept Release Date:...

  16. Boyer wins Meritorious Service Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    54th Annual Meeting with an Edway R. Johnson Meritorious Service Award for his technical research in international safeguards and his mentoring of university students and young...

  17. Wellness Services | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    wellness services are available for Ames Laboratory employees: Weight monitoring Blood pressure monitoring Information on medications, diseases, treatments and other health...

  18. HIC Services | Open Energy Information

    Open Energy Info (EERE)

    Name: HIC & Services Place: Prague 10, Czech Republic Zip: CZ - 108 00 Product: Czech chemical company which is developing a method for physical purification of upgraded...

  19. Director, Information Technologies Services Office

    Broader source: Energy.gov [DOE]

    The mission of the Information Technologies Services Office (ITSO) is to provide effective corporate leadership to proactively identify and manage business system efficiency improvements and to...

  20. Food Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employee Services » Food Services Food Services The Department offers many food services for employees within the Headquarters' buildings. Forrestal Forrestal Cafeteria (2nd floor, West Building). See the Cafeteria web page for further information. Hours: Monday-Friday 6:45 a.m. to 3:00 p.m. Breakfast hours are from 6:45 a.m. until 10:00 a.m., lunch from 11:00 a.m. until 2:00 p.m., and a "Happy Hour" is featured from 2:00-2:30 p.m. offering 30% off all hot and cold buffet items. Other

  1. Rocky Flats Closure Unit Cost Data

    SciTech Connect (OSTI)

    Sanford, P.C.; Skokan, B.

    2007-07-01

    The Rocky Flats Closure Project has completed the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, remediating environmental media and closing the Rocky Flats Site (Site). The project cost approximately $4.1 B and included the decommissioning of over 700 structures including 5 major plutonium facilities and 5 major uranium facilities, shipping over 14,600 cubic meters of transuranic and 565,000 cubic meters of low level radioactive waste, and remediating a 385-acre industrial area and the surrounding land. Actual costs were collected for a large variety of closure activities. These costs can be correlated with metrics associated with the facilities and environmental media to capture cost factors from the project that could be applicable to a variety of other closure projects both within and outside of the Department of Energy's weapons complex. The paper covers four general topics: the process to correlate the actual costs and metrics, an example of the correlated data for one large sub-project, a discussion of the results, and the additional activities that are planned to correlate and make this data available to the public. The process to collect and arrange the project control data of the Closure Project relied on the actual Closure Project cost information. It was used to correlate these actual costs with the metrics for the physical work, such as building area or waste generated, to support the development of parametric cost factors. The example provides cost factors for the Industrial Sites Project. The discussion addresses the strengths and weaknesses of the data, followed by a section identifying future activities to improve and extend the analyses and integrate it within the Department's Environmental Cost Analysis System. (authors)

  2. Simple cost model for EV traction motors

    SciTech Connect (OSTI)

    Cuenca, R.M.

    1995-02-01

    A simple cost model has been developed that allows the calculation of the OEM cost of electric traction motors of three different types, normalized as a function of power in order to accommodate different power and size. The model includes enough information on the various elements integrated in the motors to allow analysis of individual components and to factor-in the effects of changes in commodities prices. A scalable cost model for each of the main components of an electric vehicle (EV) is a useful tool that can have direct application in computer simulation or in parametric studies. For the cost model to have wide usefulness, it needs to be valid for a range of values of some parameter that determines the magnitude or size of the component. For instance, in the case of batteries, size may be determined by energy capacity, usually expressed in kilowatt-hours (kWh), while in the case of traction motors, size is better determined by rated power, usually expressed in kilowatts (kW). The simplest case is when the cost of the component in question is a direct function of its size; then cost is simply the product of its specific cost ($/unit size) and the number of units (size) in the vehicle in question. Batteries usually fall in this category (cost = energy capacity x $/kWh). But cost is not always linear with size or magnitude; motors (and controllers), for instance, become relatively less expensive as power rating increases. Traction motors, one of the main components for EV powertrains are examined in this paper, and a simplified cost model is developed for the three most popular design variations.

  3. World enrichment services market 1990-2005

    SciTech Connect (OSTI)

    1990-08-01

    Growth in world enrichment capacity, already in oversupply, will lead to a very competitive enrichment services market by the second half of the 1990s. Three of the four primary enrichment suppliers (USDOE, Eurodif, and Urenco) already have the capacity to produce 33 million SWU per year. Explorts from the Soviet Union and the People`s Republic of China (PRC) currently make available an additional six million SWU per year, and that figure could rise substantially. With additional supply capability expected from China, the Soviet Union, Louisiana Energy Services (LES) and Isotope Technologies (ITI), and the increased capacity of Urenco, and possibly even AVLIS from DOE, enrichment supply capability could exceed 46 million SWU per year by the year 2000. Yet annual enrichment requirements are only estimated to grow from 23.5 million SWU in 1990, to 28.9 million SWU by 2000. Total unfilled enrichment requirements will rise significantly in the second half of the 1990s, particularly from US utilities, creating sales opportunities for which suppliers will compete aggressively. These factors foretell a very competitive market in which sellers will offer low prices and flexible contracts. The anticipation of such strong competition also raises the question of which enrichment technology will succeed, and puts tremendous pressure on all suppliers to find cost-effective means of production as quickly as possible.

  4. Dissecting the Cost of the Smart Grid | Open Energy Information

    Open Energy Info (EERE)

    Equivalent URI: cleanenergysolutions.orgcontentdissecting-cost-smart-grid Language: English Policies: Regulations Regulations: "Resource Integration Planning,Cost...

  5. Benefit/cost analysis of RDF process in Taiwan (Conference) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Benefit/cost analysis of RDF process in Taiwan Citation Details In-Document Search Title: Benefit/cost analysis of RDF process in Taiwan Ă— You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and technology. A paper copy of this document is also available for

  6. Total Estimated Contract Cost: Contract Option Period: Maximum Fee

    Office of Environmental Management (EM)

    Maximum Fee Performance Period Fee Earned FY2011/2012 $4,059,840 FY2013 $2,928,000 FY2014 $3,022,789 FY2015 FY2016 Cumulative Fee $10,010,629 $19,878,019 $3,214,544 $5,254,840 $5,662,028 $1,421,695 Fee Available $4,324,912 $417,833,183 Contract Base Period: January 3, 2011 - September 2, 2016 (Extended) Fee Information Minimum Fee $0 N/A $19,878,019 Contractor: Babcock & Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee

  7. Distributed utility technology cost, performance, and environmental characteristics

    SciTech Connect (OSTI)

    Wan, Y.; Adelman, S.

    1995-06-01

    Distributed Utility (DU) is an emerging concept in which modular generation and storage technologies sited near customer loads in distribution systems and specifically targeted demand-side management programs are used to supplement conventional central station generation plants to meet customer energy service needs. Research has shown that implementation of the DU concept could provide substantial benefits to utilities. This report summarizes the cost, performance, and environmental and siting characteristics of existing and emerging modular generation and storage technologies that are applicable under the DU concept. It is intended to be a practical reference guide for utility planners and engineers seeking information on DU technology options. This work was funded by the Office of Utility Technologies of the US Department of Energy.

  8. Product Service Codes @ Headquarters Description: Product Services Codes used at Headquartes Procurement Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Product Service Codes @ Headquarters Description: Product Services Codes used at Headquartes Procurement Services Filters: Signed Date only show values between , Contracting Agency ID only show values equal to '8900', Contracting Office ID only show values equal to '00001', Modification Number only show values equal to '0', Date Signed only show values between '05/01/2011' and '04/30/2012', Last Modified Date only show values between Contracting Agency ID: 8900, Contracting Office ID: 00001

  9. Renewable Energy Planning: Multiparametric Cost Optimization

    SciTech Connect (OSTI)

    Walker, A.

    2008-01-01

    This paper describes a method for determining the combination of renewable energy technologies that minimize life-cycle cost at a facility, often with a specified goal regarding percent of energy use from renewable sources. Technologies include: photovoltaics (PV); wind; solar thermal heat and electric; solar ventilation air preheating; solar water heating; biomass heat and electric (combustion, gasification, pyrolysis, anaerobic digestion); and daylighting. The method rests upon the National Renewable Energy Laboratory's (NREL's) capabilities in characterization of technology cost and performance, geographic information systems (GIS) resource assessment, and life-cycle cost analysis. The paper discusses how to account for the way candidate technologies interact with each other, and the solver routine used to determine the combination that minimizes life-cycle cost. Results include optimal sizes of each technology, initial cost, operating cost, and life-cycle cost, including incentives from utilities or governments. Results inform early planning to identify and prioritize projects at a site for subsequent engineering and economic feasibility study.

  10. Renewable Energy Planning: Multiparametric Cost Optimization; Preprint

    SciTech Connect (OSTI)

    Walker, A.

    2008-05-01

    This paper describes a method for determining the combination of renewable energy technologies that minimize life-cycle cost at a facility, often with a specified goal regarding percent of energy use from renewable sources. Technologies include: photovoltaics (PV); wind; solar thermal heat and electric; solar ventilation air preheating; solar water heating; biomass heat and electric (combustion, gasification, pyrolysis, anaerobic digestion); and daylighting. The method rests upon the National Renewable Energy Laboratory's (NREL's) capabilities in characterization of technology cost and performance, geographic information systems (GIS) resource assessment, and life-cycle cost analysis. The paper discusses how to account for the way candidate technologies interact with each other, and the solver routine used to determine the combination that minimizes life-cycle cost. Results include optimal sizes of each technology, initial cost, operating cost, and life-cycle cost, including incentives from utilities or governments. Results inform early planning to identify and prioritize projects at a site for subsequent engineering and economic feasibility study.

  11. Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

    SciTech Connect (OSTI)

    Lacey, Ph.D, P.E., Ronald E.

    2012-07-16

    Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

  12. DOE Awards Support Service Contract

    Broader source: Energy.gov [DOE]

    Cincinnati - The U.S. Department of Energy (DOE) today announced the award of an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract to DLE Technical Services, LLC of Palm City, FL. DLE Technical Services, LLC is a Small Business Administration (SBA) Certified 8(a) Program Participant.

  13. Materials for Harsh Service Conditions:

    Office of Environmental Management (EM)

    Materials for Harsh Service Conditions: 1 Technology Assessment 2 Contents 3 1. Introduction to the Technology/System ............................................................................................... 1 4 1.1 Overview of Materials for Harsh Service Conditions .................................................................... 1 5 1.2 Challenges and Opportunities ....................................................................................................... 2 6 1.3 Public

  14. Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-04-01

    FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

  15. Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-07-01

    FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

  16. Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-04-01

    FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

  17. Cost and code study of underground buildings

    SciTech Connect (OSTI)

    Sterling, R.L.

    1981-01-01

    Various regulatory and financial implications for earth-sheltered houses and buildings are discussed. Earth-sheltered houses are covered in the most detail including discussions of building-code restrictions, HUD Minimum Property Standards, legal aspects, zoning restrictions, taxation, insurance, and home financing. Examples of the initial-cost elements in earth-sheltered houses together with projected life-cycle costs are given and compared to more-conventional energy-conserving houses. For larger-scale underground buildings, further information is given on building code, fire protection, and insurance provisions. Initial-cost information for five large underground buildings is presented together with energy-use information where available.

  18. How three smart managers control steam costs

    SciTech Connect (OSTI)

    Kendall, R.

    1982-11-01

    Three steam-intensive companies report innovative ways to reduce steam-production costs. Goodyear Tire and Rubber Co. concentrated on regular maintenance, process modifications, and heat recovery, but also has an on-going policy of seeking further cost savings. Future efforts will explore computer-based boiler controls. Zenith Radio Corporation's color picture tube-making process uses 12% less steam after 700 mechanical steam traps were replaced with fixed-orifice traps. Petro-Tex Chemical Corp. reduced steam costs by monitoring and optimizing process units and by making capital investments to improve steam management. (DCK)

  19. Reported Energy and Cost Savings from the DOE ESPC Program: FY 2014

    SciTech Connect (OSTI)

    Slattery, Bob S.

    2015-03-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $210.6 million, total reported cost savings were $215.1 million, and total guaranteed cost savings were $204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.

  20. U.S. Geographic Analysis of the Cost of Hydrogen from Electrolysis

    SciTech Connect (OSTI)

    Saur, G.; Ainscough, C.

    2011-12-01

    This report summarizes U.S. geographic analysis of the cost of hydrogen from electrolysis. Wind-based water electrolysis represents a viable path to renewably-produced hydrogen production. It might be used for hydrogen-based transportation fuels, energy storage to augment electricity grid services, or as a supplement for other industrial hydrogen uses. This analysis focuses on the levelized production, costs of producing green hydrogen, rather than market prices which would require more extensive knowledge of an hourly or daily hydrogen market. However, the costs of hydrogen presented here do include a small profit from an internal rate of return on the system. The cost of renewable wind-based hydrogen production is very sensitive to the cost of the wind electricity. Using differently priced grid electricity to supplement the system had only a small effect on the cost of hydrogen; because wind electricity was always used either directly or indirectly to fully generate the hydrogen. Wind classes 3-6 across the U.S. were examined and the costs of hydrogen ranged from $3.74kg to $5.86/kg. These costs do not quite meet the 2015 DOE targets for central or distributed hydrogen production ($3.10/kg and $3.70/kg, respectively), so more work is needed on reducing the cost of wind electricity and the electrolyzers. If the PTC and ITC are claimed, however, many of the sites will meet both targets. For a subset of distributed refueling stations where there is also inexpensive, open space nearby this could be an alternative to central hydrogen production and distribution.

  1. Photovoltaic balance-of-system designs and costs at PVUSA

    SciTech Connect (OSTI)

    Reyes, A.B.; Jennings, C.

    1995-05-01

    This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA`s main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA`s key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.

  2. USDA High Energy Cost Grant Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Agriculture (USDA) is accepting applications for the improvement of energy generation, transmission, and distribution facilities serving rural communities with home energy costs that are over 275% of the national average.

  3. Total Estimated Contract Cost: Performance Period

    Office of Environmental Management (EM)

    FY2012 Fee Information Minimum Fee Maximum Fee September 2015 Contract Number: Cost Plus Incentive Fee Contractor: 3,264,909,094 Contract Period: EM Contractor Fee s Idaho...

  4. Cost of Energy | Open Energy Information

    Open Energy Info (EERE)

    as well as projections for the future. Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A.; Schwabe, P. (March 2013). 2011 Cost of Wind Energy Review. National Renewable...

  5. Extreme Balance of System Hardware Cost Reduction

    Broader source: Energy.gov [DOE]

    On September 1, 2011, DOE announced $42.4 million in funding over three years for the Extreme Balance of System Hardware Cost Reduction (BOS-X) funding opportunity. Part of the SunShot Systems...

  6. SEP 2015 Cost Benefit Analysis Paper

    Broader source: Energy.gov [DOE]

    This Superior Energy Performance® (SEP™) paper analyzes previously reported and newly collected data of costs and benefits associated with the implementation of an ISO 50001 and SEP certification.

  7. Top Low- or No-Cost Improvements

    Broader source: Energy.gov [DOE]

    This presentation describes the top low- or no-cost projects to improve energy efficiency as identified in energy assessments performed by DOE and by the Industrial Assessment Centers.

  8. Energy Cost Control: How the Money Works

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Christopher Russell Energy PathFINDER www.energypathfinder.com crussell@energypathfinder.com Energy Cost Control: How the Money Works (Copies of these slides to be provided by ...

  9. New developments in capital cost estimating

    SciTech Connect (OSTI)

    Stutz, R.A.; Zocher, M.A.

    1988-01-01

    The new developments in cost engineering revolve around the ability to capture information that in the past could not be automated. The purpose of automation is not to eliminate the expert cost engineer. The goal is to use available technology to have more information available to the professionals in the cost engineering field. In that sense, the demand for expertise increases in order to produce the highest quality estimate and project possible from all levels of cost engineers. We cannot overemphasize the importance of using a good source of expert information in building these types of programs. ''Garbage in, garbage out'' still applies in this form of programming. Expert systems technology will become commonplace in many vertical markets; it is important to undersand what can and cannot be accomplished in our field, and where this technology will lead us in the future.

  10. Costs | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 working days of the event. Any additional costs that are the result of additional audio visual usage or extraordinary cleanupdamages will be billed to the user. Use of the...

  11. Low-Cost, Lightweight Solar Concentrators

    Broader source: Energy.gov (indexed) [DOE]

    Cost, Lightweight Solar Concentrators California Institute of Technology/Jet Propulsion Laboratory Award Number:0595-1612 | January 15, 2013 | Ganapathi Thin Film mirror is ~40-50% cheaper and 60% lighter than SOA * Project leverages extensive space experience by JPL and L'Garde to develop a low-cost parabolic dish capable of providing 4 kW thermal. Key features: * Metallized reflective thin film material with high reflectivity (>93%) with polyurethane foam backing * Single mold polyurethane

  12. Capturing Waste Gas: Saves Energy, Lower Costs

    SciTech Connect (OSTI)

    2013-07-12

    In June 2009, ArcelorMittal learned about the potential to receive a 50% cost-matching grant from the American Recovery and Reinvestment Act (ARRA) administered by the U.S. Department of Energy (DOE). ArcelorMittal applied for the competitive grant and, in November, received $31.6 million as a DOE cost-sharing award. By matching the federal funding, ArcelorMittal was able to construct a new, high efficiency Energy Recovery & Reuse 504 Boiler and supporting infrastructure.

  13. With low projected manufacturing costs, high ion

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    low projected manufacturing costs, high ion conductivities, reduced cross-over, chemical and thermal stability in both acidic and alkaline environments, the Sandia membrane technology is positioned to lower the cost of many energy-water systems. Poly (phenylene)-based Hydrocarbon Membrane Separators With a larger component of our electricity generation coming from intermittent and variable sources, stationary energy storage and local power generation will be essential for continued growth of the

  14. Reducing Power Factor Cost | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reducing Power Factor Cost Reducing Power Factor Cost Low power factor is expensive and inefficient. Many utility companies charge an additional fee if your power factor is less than 0.95. Low power factor also reduces your electrical system's distribution capacity by increasing current flow and causing voltage drops. This fact sheet describes power factor and explains how you can improve your power factor to reduce electric bills and enhance your electrical system's capacity. PDF icon Reducing

  15. Hydrogen and Infrastructure Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Costs Hydrogen and Infrastructure Costs Presentation by Fred Joseck, U.S. Department of Energy Fuel Cell Technologies Program, at the Hydrogen Infrastructure Market Readiness Workshop, February 17, 2011, in Washington, DC. PDF icon wkshp_market_readiness_joseck.pdf More Documents & Publications Overview of Hydrogen and Fuel Cells: National Academy of Sciences March 2011 H2A Delivery Models and Results Analysis of a Cluster Strategy for Near Term Hydrogen Infrastructure Rollout

  16. Certificate of Current Cost and Pricing Data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CERTIFICATE OF CURRENT COST AND PRICING DATA (OCT 1997) This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 15.401 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's representative in support of * are accurate, complete, and current as of **. This certification includes the

  17. Soft Costs Competitive Awards | Department of Energy

    Energy Savers [EERE]

    Soft Costs Competitive Awards Soft Costs Competitive Awards Open Funding Opportunities State Energy Evolution and Diffusion Studies II - State Energy Strategies (SEEDSII-SES) Mandatory concept paper due March 8, 2016 Current Awards Funding Program Year Announced Amount Awarded Solar Powering America by Recognizing Communities (SPARC) 2015 $13M SunShot Prize 2015 $10M Solar Market Pathways 2015 $16.5M Catalyst Energy Innovation Prize 2014 $1M Rooftop Solar Challenge II 2013 $12M Grid Engineering

  18. Project Cost Profile Spreadsheet | Department of Energy

    Energy Savers [EERE]

    Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures (SOP) discuss all elements of EIRs including review

  19. Watt Does It Cost To Use It?

    Broader source: Energy.gov (indexed) [DOE]

    Watt Does It Cost to Use It? Grades: 5-8, 9-12 Topic: Energy Efficiency and Conservation Author: Mark Ziesmer Owner: Alliance to Save Energy This educational material is brought to you by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. WATT DOES IT COST TO USE IT? By Mark Ziesmer, Sultana High School Hesperia Unified School District, California Overview: Familiarize students with how electrical usage is counted, electrical pricing, and measure and evaluate

  20. Cost reduction ideas for LNG terminals

    SciTech Connect (OSTI)

    Habibullah, A.; Weldin, F.

    1999-07-01

    LNG projects are highly capital intensive and this has long been regarded as being inevitable. However, recent developments are forcing the LNG industry to aggressively seek cost reductions. For example, the gas-to-liquids (GTL) process is increasingly seen as a potential rival technology and is often being touted as an economically superior alternative fuel source. Another strong driving force behind needed cost reductions is the low crude oil price which seems to have settled in the $10--13/bb. range. LNG is well positioned as the fuel of choice for environmentally friendly new power projects. As a result of the projected demand for power especially in the Pacific Rim countries several LNG terminal projects are under consideration. Such projects will require a new generation of LNG terminal designs emphasizing low cost, small scale and safe and fully integrated designs from LNG supply to power generation. The integration of the LNG terminal with the combined cycle gas turbine (CCGT) power plant offers substantial cost savings opportunities for both plants. Various cost reduction strategies and their impact on the terminal design are discussed including cost reduction due to integration.

  1. Hydrogen production and delivery analysis in US markets : cost, energy and greenhouse gas emissions.

    SciTech Connect (OSTI)

    Mintz, M.; Gillette, J.; Elgowainy, A.

    2009-01-01

    Hydrogen production cost conclusions are: (1) Steam Methane Reforming (SMR) is the least-cost production option at current natural gas prices and for initial hydrogen vehicle penetration rates, at high production rates, SMR may not be the least-cost option; (2) Unlike coal and nuclear technologies, the cost of natural gas feedstock is the largest contributor to SMR production cost; (3) Coal- and nuclear-based hydrogen production have significant penalties at small production rates (and benefits at large rates); (4) Nuclear production of hydrogen is likely to have large economies of scale, but because fixed O&M costs are uncertain, the magnitude of these effects may be understated; and (5) Given H2A default assumptions for fuel prices, process efficiencies and labor costs, nuclear-based hydrogen is likely to be more expensive to produce than coal-based hydrogen. Carbon taxes and caps can narrow the gap. Hydrogen delivery cost conclusions are: (1) For smaller urban markets, compressed gas delivery appears most economic, although cost inputs for high-pressure gas trucks are uncertain; (2) For larger urban markets, pipeline delivery is least costly; (3) Distance from hydrogen production plant to city gate may change relative costs (all results shown assume 100 km); (4) Pipeline costs may be reduced with system 'rationalization', primarily reductions in service pipeline mileage; and (5) Liquefier and pipeline capital costs are a hurdle, particularly at small market sizes. Some energy and greenhouse gas Observations: (1) Energy use (per kg of H2) declines slightly with increasing production or delivery rate for most components (unless energy efficiency varies appreciably with scale, e.g., liquefaction); (2) Energy use is a strong function of production technology and delivery mode; (3) GHG emissions reflect the energy efficiency and carbon content of each component in a production-delivery pathway; (4) Coal and natural gas production pathways have high energy consumption and significant GHG emissions (in the absence of carbon caps, taxes or sequestration); (5) Nuclear pathway is most favorable from energy use and GHG emissions perspective; (6) GH2 Truck and Pipeline delivery have much lower energy use and GHG emissions than LH2 Truck delivery; and (7) For LH2 Truck delivery, the liquefier accounts for most of the energy and GHG emissions.

  2. DOE Fuel Cell Technologies Office Record 12024: Hydrogen Production Cost

    Office of Environmental Management (EM)

    Using Low-Cost Natural Gas | Department of Energy 2024: Hydrogen Production Cost Using Low-Cost Natural Gas DOE Fuel Cell Technologies Office Record 12024: Hydrogen Production Cost Using Low-Cost Natural Gas This program record from the U.S. Department of Energy's Fuel Cell Technologies Office provides information about the cost of hydrogen production using low-cost natural gas. PDF icon DOE Hydrogen and Fuel Cells Program Record # 12024 More Documents & Publications Distributed Hydrogen

  3. Connection Without the Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    By removing the need to replace the electrical service panel and run wiring through a ... allow utilities to ensure grid stability, and help reduce the likelihood of power outages. ...

  4. RESTful Web Services at BNL

    SciTech Connect (OSTI)

    Casella, R.

    2011-06-14

    RESTful (REpresentational State Transfer) web services are an alternative implementation to SOAP/RPC web services in a client/server model. BNLs IT Division has started deploying RESTful Web Services for enterprise data retrieval and manipulation. Data is currently used by system administrators for tracking configuration information and as it is expanded will be used by Cyber Security for vulnerability management and as an aid to cyber investigations. This talk will describe the implementation and outstanding issues as well as some of the reasons for choosing RESTful over SOAP/RPC and future directions.

  5. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II )

    1991-12-01

    This article outlines the minimum safety requirements that should be considered for onshore and offshore oil well service operations with coiled tubing equipment. These guidelines comply with Minerals Management Service (MMS) regulations issued on May 31, 1988, for offshore work. Where specific MMS regulations are sited, the regulation reference, Incident of Non-Compliance (INC), number is provided. These guidelines can be used by operators and contractors, and although U.S. offshore operations are emphasized, they are applicable wherever coiled tubing services are used.

  6. SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) |

    Energy Savers [EERE]

    Department of Energy SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Form documents modifications and changes to approved assignments and courses. PDF icon SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) More Documents & Publications SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Candidate Developmental Assignment Evaluation SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT

  7. Product Service Codes @ Headquarters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Product Service Codes @ Headquarters Product Service Codes @ Headquarters A listing of Product Service Codes used at Headquarters Procurement Services PDF icon Produce Service Codes @ Headquarters.pdf More Documents & Publications NAICS Codes @ Headquarters Federal Reporting Recipient Information Federal Reporting Recipient Information

  8. NNSA Service Center Chart | Department of Energy

    Office of Environmental Management (EM)

    NNSA Service Center Chart NNSA Service Center Chart Office of Chief Counsel at the NNSA Service Center in Albuquerque, NM PDF icon NNSA Service Center Chart More Documents & Publications Technical Qualification Program Accreditation Schedule 2011 Annual Planning Summary for NNSA Service Center (NNSASC) EIS-0466: Notice of Intent to Prepare an Environmental Impact Statement

  9. Increased cost-effectiveness of low-grade fossil fuels using ammonia FGD

    SciTech Connect (OSTI)

    Ellison, W.

    1998-04-01

    Current worldwide advancements in site-specific application and commercial operation of ammonia-base flue gas desulfurization, (FGD), in high-capacity, high-sulfur, electric utility service, economically justified by significant revenues from ammonium sulfate generation and worldwide sale, are detailed. This major new direction in cost-effectiveness in FGD selection/application and in the process design of such flue gas cleaning systems overcomes the problem of FGD waste/byproduct management/utilization and encompasses numerous major performance advancements reviewed herein: (1) Conversion of anions of all captured acid-gas, i.e. SO2, HCl, etc., and of all collected residual particulate matter into agriculturally-usable ammonium compounds combined in the single byproduct yield, (2) no discard or long-term, outdoor storage of sulfurous waste byproducts, and (3) no liquid effluent. In the face of a capital-cost penalty in any application of ammonia FGD, an attractive cost effectiveness is nonetheless realized.

  10. Property Services | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Property Services Ames Laboratory shall manage Government personal property in an economical and efficient manner consistent with the DOE Contract and DOE Order CRD 580.1A Chg 1....

  11. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 09:00 PPT on the above effective date. On October 15, 2013, at 08:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2014...

  12. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 12:00 PPT on the above effective date. On October 1, 2015, at 11:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2016...

  13. Excel to NGDS Services Tool

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    This site allows state data contributors to standardize their data in a USIGN content model, ensure that it meets all specifications, reprojects spatial data, and creates a geodatabase that is ready for web services deployment for tier 3 data.

  14. Utility Energy Services Contracts Guide

    SciTech Connect (OSTI)

    2013-09-01

    The UESC Guide is a compilation of samples and templates developed as a resource to help contracting officers implement task orders for UESCs under existing U.S. General Services Administration areawide contracts.

  15. ORDER FOR SUPPLIES OR SERVICES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad NM 88221 DE-EM0001840 NET 30 f. SERVICE-DISABLED VETERAN-OWNED e. HUBZone g. WOMEN-OWNED SMALL BUSINESS (WOSB) ELIGIBLE UNDER THE WOSB PROGRAM h. EDWOSB Effective Date...

  16. ORDER FOR SUPPLIES OR SERVICES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad NM 88221 DE-EM0001840 NET 30 f. SERVICE-DISABLED VETERAN-OWNED e. HUBZone g. WOMEN-OWNED SMALL BUSINESS (WOSB) ELIGIBLE UNDER THE WOMEN-OWNED SMALL BUSINESS PROGRAM h....

  17. EWEB- Energy Management Services Rebate

    Broader source: Energy.gov [DOE]

    The Eugene Water & Electric Board (EWEB) offers cash incentives and low interest loans to businesses as part of the Energy Management Services program for the installation of solar domestic,...

  18. Transfer Service (contracts/rd)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    issues regarding Transfer Service. Questions on this program can be sent to Garry Thompson at grthompson@bpa.gov or Connie Howard at cmhoward@bpa.gov. Comments can be e-mailed...

  19. Boyer wins Meritorious Service Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Boyer wins Meritorious Service Award from INMM September 5, 2013 The Institute of Nuclear Materials Management (INMM) honored Brian D. Boyer of the Laboratory's Systems Design and Analysis group at the 54th Annual Meeting with an Edway R. Johnson Meritorious Service Award for his technical research in international safeguards and his mentoring of university students and young professionals in nuclear materials management. This lifetime achievement award is a significant recognition of Boyer's

  20. Sample Retention Incentive Service Agreement

    Energy Savers [EERE]

    : Phased Retirement Service Agreement Introduction This is an employment agreement between ____(employee's name)_____ (hereinafter referred to as "you" or "your") and the ______(Departmental element)________ (hereinafter referred to as "the employer" or Departmental element) for the purpose of the employer committing to retaining you in a phased retirement status to fulfill a critical need and, in return, your committing to a period of service to the employer. This