Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Definition: Reduced Ancillary Service Cost | Open Energy Information  

Open Energy Info (EERE)

Ancillary Service Cost Ancillary Service Cost Jump to: navigation, search Dictionary.png Reduced Ancillary Service Cost Ancillary services are necessary to ensure the reliable and efficient operation of the grid. The level of ancillary services required at any point in time is determined by the grid operator and/or energy market rules. Ancillary services, including spinning reserve and frequency regulation, could be reduced if generators could more closely follow load; peak load on the system was reduced; power factor, voltage, and VAR control were improved; or information available to grid operators were improved.[1] View on Wikipedia Wikipedia Definition Related Terms ancillary service, frequency regulation, smart grid References ↑ SmartGrid.gov 'Description of Benefits' An in

2

Cost of Providing Ancillary Services from Power Plants  

Science Conference Proceedings (OSTI)

In a deregulated power supply market, extra generating capacity is needed to follow the moment-to-moment load variations in order to maintain the scheduled system frequency. This report describes a new methodology for determining the cost of providing regulation and frequency response service as an ancillary service.

1997-06-26T23:59:59.000Z

3

Methodology for Costing Ancillary Services from Hydro Resources  

Science Conference Proceedings (OSTI)

Due to the unique flexibility of Hydro resources, Hydro resource owners perceive a unique opportunity to profit from emerging markets for Ancillary Services (A/S) service products. Effective pricing and profitability measurement tools, however, are not widely available. This report creates a framework for defining A/S products and develops a methodology for calculating total incremental costs of providing A/S in terms of five cost elements.

2000-11-29T23:59:59.000Z

4

Ancillary-service costs for 12 US electric utilities  

Science Conference Proceedings (OSTI)

Ancillary services are those functions performed by electrical generating, transmission, system-control, and distribution-system equipment and people to support the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission defined ancillary services as ``those services necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.`` FERC divided these services into three categories: ``actions taken to effect the transaction (such as scheduling and dispatching services) , services that are necessary to maintain the integrity of the transmission system [and] services needed to correct for the effects associated with undertaking a transaction.`` In March 1995, FERC published a proposed rule to ensure open and comparable access to transmission networks throughout the country. The rule defined six ancillary services and developed pro forma tariffs for these services: scheduling and dispatch, load following, system protection, energy imbalance, loss compensation, and reactive power/voltage control.

Kirby, B.; Hirst, E.

1996-03-01T23:59:59.000Z

5

Methodology for Costing Ancillary Services from Hydro Resources: Case Study and Guidelines  

Science Conference Proceedings (OSTI)

A previous EPRI report, "Methodology for Costing Ancillary Services From Hydro Resources" (1000642), established a methodology for determining the cost of ancillary services (A/S). This current report is the second in a series on maximizing the value of hydropower assets using optimization techniques. It is the first to draw conclusions based on applying the multiproduct hydro optimization tool, developed from the methodology in EPRI report 1000642.

2001-10-30T23:59:59.000Z

6

Ancillary services market in California  

SciTech Connect

This report includes sections on the following topics: (1) California restructured electricity system overview; (2) Reliability criteria; (3) Design of the California ISO ancillary services market; (4) Operation of ancillary services markets; (5) Ancillary services markets redesign; and (6) Conclusions.

Gomez, T.; Marnay, C.; Siddiqui, A.; Liew, L.; Khavkin, M.

1999-07-01T23:59:59.000Z

7

Cost-Causation-Based Tariffs for Wind Ancillary Service Impacts: Preprint  

Science Conference Proceedings (OSTI)

Conference paper discussing the integration cost of wind. Although specific tariffs for wind generation for ancillary services are uncommon, we anticipate that balancing authorities (control areas) and other entities will move toward such tariffs. Tariffs for regulation and imbalance services should be cost-based, recognize the relevant time scales that correspond with utility operational cycles, and properly allocate those costs to those entities that cause the balancing authority to incur the costs. In this paper, we present methods for separating wind's impact into regulation and load following (imbalance) time scales. We show that approximating these impacts with simpler methods can significantly distort cost causation and even cause confusion between the relevant time scales. We present results from NREL's wind data collection program to illustrate the dangers of linearly scaling wind resource data from small wind plants to approximate the wind resource data from large wind plants. Finally, we provide a framework for developing regulation and imbalance tariffs, we outline methods to begin examining contingency reserve requirements for wind plants, we provide guidance on the important characteristics to consider, and we provide hypothetical cases that the tariff can be tested against to determine whether the results are desired.

Kirby, B.; Milligan, M.; Wan, Y.

2006-06-01T23:59:59.000Z

8

Ancillary Services Measurement Handbook  

Science Conference Proceedings (OSTI)

In the deregulated electric utility industry, it is anticipated that many ancillary services (A/S) will be sold by "generators" to operating authorities (OAs) or independent system operators (ISOs). Such trade-in A/S will require contractual agreements, and these agreements will need to specify quality and quantity of service to be supplied. This, again, means it will be necessary to certify or measure the quality of an A/S to be supplied, as well as the quantity actually supplied. Towards that end, this...

2001-12-18T23:59:59.000Z

9

Ancillary Services Provided from DER  

SciTech Connect

Distributed energy resources (DER) are quickly making their way to industry primarily as backup generation. They are effective at starting and then producing full-load power within a few seconds. The distribution system is aging and transmission system development has not kept up with the growth in load and generation. The nation's transmission system is stressed with heavy power flows over long distances, and many areas are experiencing problems in providing the power quality needed to satisfy customers. Thus, a new market for DER is beginning to emerge. DER can alleviate the burden on the distribution system by providing ancillary services while providing a cost adjustment for the DER owner. This report describes 10 types of ancillary services that distributed generation (DG) can provide to the distribution system. Of these 10 services the feasibility, control strategy, effectiveness, and cost benefits are all analyzed as in the context of a future utility-power market. In this market, services will be provided at a local level that will benefit the customer, the distribution utility, and the transmission company.

Campbell, J.B.

2005-12-21T23:59:59.000Z

10

Ancillary Services Provided from DER  

DOE Green Energy (OSTI)

Distributed energy resources (DER) are quickly making their way to industry primarily as backup generation. They are effective at starting and then producing full-load power within a few seconds. The distribution system is aging and transmission system development has not kept up with the growth in load and generation. The nation's transmission system is stressed with heavy power flows over long distances, and many areas are experiencing problems in providing the power quality needed to satisfy customers. Thus, a new market for DER is beginning to emerge. DER can alleviate the burden on the distribution system by providing ancillary services while providing a cost adjustment for the DER owner. This report describes 10 types of ancillary services that distributed generation (DG) can provide to the distribution system. Of these 10 services the feasibility, control strategy, effectiveness, and cost benefits are all analyzed as in the context of a future utility-power market. In this market, services will be provided at a local level that will benefit the customer, the distribution utility, and the transmission company.

Campbell, J.B.

2005-12-21T23:59:59.000Z

11

Demand Response for Ancillary Services  

Science Conference Proceedings (OSTI)

Many demand response resources are technically capable of providing ancillary services. In some cases, they can provide superior response to generators, as the curtailment of load is typically much faster than ramping thermal and hydropower plants. Analysis and quantification of demand response resources providing ancillary services is necessary to understand the resources economic value and impact on the power system. Methodologies used to study grid integration of variable generation can be adapted to the study of demand response. In the present work, we describe and illustrate a methodology to construct detailed temporal and spatial representations of the demand response resource and to examine how to incorporate those resources into power system models. In addition, the paper outlines ways to evaluate barriers to implementation. We demonstrate how the combination of these three analyses can be used to translate the technical potential for demand response providing ancillary services into a realizable potential.

Alkadi, Nasr E [ORNL; Starke, Michael R [ORNL

2013-01-01T23:59:59.000Z

12

Creating competitive markets for ancillary services  

Science Conference Proceedings (OSTI)

This report describes the structure of, and results from, a spreadsheet model. The model simulates markets for seven services: losses, regulation, spinning reserve, supplemental reserve,load following, energy imbalance, and voltage support. For completeness, the model also calculates costs for system control, although this service will continue to be provided solely the the system operator under cost-based prices. This computer model demonstrated the likely complexity of markets for energy and ancillary services. This complexity arises because these markets are highly interdependent. Because these markets are interactive, the costs and therefore the prices of these services will vary considerably as functions of system load and the current spot price of energy. The price of ancillary services in aggregate is highly correlated with the price of energy. A base-case utility was developed for use with the model and included in the report.

Hirst, E.; Kirby, B.

1997-10-01T23:59:59.000Z

13

Definition: Ancillary Services Revenue | Open Energy Information  

Open Energy Info (EERE)

Revenue generated through the competitive ancillary services market for spinning reserves or frequency regulation.1 View on Wikipedia Wikipedia Definition Related Terms...

14

Cost of Providing Ancillary Services from Power Plants: Reactive Supply and Voltage Control  

Science Conference Proceedings (OSTI)

This report provides a methodology for determining the variable costs of generating and supplying reactive power to a transmission system, via the generator step-up transformer, for system voltage control. The report examines the costs of additional energy losses, maintenance, repair, and plant aging associated with the generation of reactive power. TR-107270-V3SI contains System of International units.

1997-09-02T23:59:59.000Z

15

Data centres in the ancillary services market  

Science Conference Proceedings (OSTI)

Ancillary services are the mechanisms power grids use to address short-term variability in supply and demand as well as the impact of power plant or transmission line failures. Organizations providing such services can earn revenue, or at least reduce ... Keywords: simulation,electrical markets,ancillary services,smart grids

David Aikema; Rob Simmonds; Hamidreza Zareipour

2012-06-01T23:59:59.000Z

16

Demand Response Providing Ancillary Services A Comparison of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Demand Response Providing Ancillary Services A Comparison of Opportunities and Challenges in the US Wholesale Markets Title Demand Response Providing Ancillary Services A...

17

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

Service and Balancing Energy Service (ERCOT 2006b). Loadsof a commercial energy services industry, especially loadparticipation in both energy and ancillary services markets.

Heffner, Grayson

2008-01-01T23:59:59.000Z

18

Photovoltaic-based Demand Response and Ancillary Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Photovoltaic-based Demand Response and Ancillary Services Photovoltaic-based Demand Response and Ancillary Services Speaker(s): Bill Vogel Date: June 22, 2012 - 1:00pm Location: 90-1099 Seminar Host/Point of Contact: David S. Watson This presentation describes innovations in intelligent micro inverters for use with photovoltaic (PV) systems. The micro-inverters enable remotely adjustable phase angles (+/- up to 45 degrees). The technology includes dynamic impedance matching and ultra-low cost dynamic reactive power management of digital power sources. These attributes can help mitigate grid balancing challenges introduced by most renewable generation resources as we strive to reach aggressive renewable portfolio standards and their associated needs for voltage support and ancillary services. The software-enabled device eliminates several pieces of heavy equipment needed

19

Ancillary services market in California  

E-Print Network (OSTI)

Service Market Redesign and FERC Filing. CAISO Internalmarket design improvements with FERC. However, from pastRegulatory Commission (FERC). 1996. Order No. 888 (Docket

Gomez, Tomas; Marnay, Chris; Siddiqui, Afzal; Liew, Lucy; Khavkin, Mark

1999-01-01T23:59:59.000Z

20

Audit of Subsidized Ancillary Services at the Nevada Test Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agencies You are here Home Audit of Subsidized Ancillary Services at the Nevada Test Site, WR-B-95-08 Audit of Subsidized Ancillary Services at the Nevada Test Site,...

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Ancillary service details: Voltage control  

SciTech Connect

Voltage control is accomplished by managing reactive power on an alternating-current power system. Reactive power can be produced and absorbed by both generation and transmission equipment. Reactive-power devices differ substantially in the magnitude and speed of response and in their capital costs. System operators, transmission owners, generators, customers, power marketers, and government regulators need to pay close attention to voltage control as they restructure the U.S. electricity industry. Voltage control can affect reliability and commerce in three ways: (1) Voltages must be maintained within an acceptable range for both customer and power-system equipment to function properly. (2) The movement of reactive power consumes transmission resources, which limits the ability to move real power and worsens congestion. (3) The movement of reactive power results in real-power losses. When generators are required to supply excessive amounts of reactive power, their real-power production must be curtailed. These opportunity costs are not currently compensated for in most regions. Current tariffs are based on embedded costs. These embedded-cost tariffs average about $0.51/MWh, equivalent to $1.5 billion annually for the United States as a whole. Although this cost is low when compared with the cost of energy, it still aggregates to a significant amount of money. This report takes a basic look at why the power system requires reactive power (an appendix explains the fundamentals of real and reactive power). The report then examines the various types of generation and transmission resources used to supply reactive power and to control voltage. Finally it discusses how these resources are deployed and paid for in several reliability regions around the country. As the U.S. electricity industry is restructured, the generation, transmission, and system-control equipment and functions that maintain voltages within the appropriate ranges are being deintegrated.

Kirby, B.; Hirst, E.

1997-12-01T23:59:59.000Z

22

Analysis of wind power ancillary services characteristics with German 250-MW wind data  

DOE Green Energy (OSTI)

With the increasing availability of wind power worldwide, power fluctuations have become a concern for some utilities. Under electric industry restructuring in the US, the impact of these fluctuations will be evaluated by examining provisions and costs of ancillary services for wind power. This paper analyzes wind power in the context of ancillary services, using data from a German 250 Megawatt Wind project.

Ernst, B.

1999-12-09T23:59:59.000Z

23

Loads Providing Ancillary Services: Review of International Experience...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LaaR Load Acting as a Resource (Texas) LMP Locational Marginal Price MCPE Market Clearing Price of Energy (Texas) NCAS Network Control Ancillary Services (Australia) NGC National...

24

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

Elkraft 2005b. Demand Response in Practice, NewsletterPanel. AESP 2006. Demand Response in Ancillary Services, B.and developing Demand response in the Energy Markets”,

Heffner, Grayson

2008-01-01T23:59:59.000Z

25

Loads Providing Ancillary Services: Review of International Experience |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loads Providing Ancillary Services: Review of International Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that

26

Loads Providing Ancillary Services: Review of International Experience |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loads Providing Ancillary Services: Review of International Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that

27

Market and Policy Barriers for Demand Response Providing Ancillary Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Market and Policy Barriers for Demand Response Providing Ancillary Services Market and Policy Barriers for Demand Response Providing Ancillary Services in U.S. Markets Title Market and Policy Barriers for Demand Response Providing Ancillary Services in U.S. Markets Publication Type Report LBNL Report Number LBNL-6155E Year of Publication 2013 Authors Cappers, Peter, Jason MacDonald, and Charles A. Goldman Date Published 03/2013 Keywords advanced metering infrastructure, aggregators of retail customers, ancillary services, demand response, electric utility regulation, electricity market rules, electricity markets and policy group, energy analysis and environmental impacts department, institutional barriers, market and value, operating reserves, retail electricity providers, retail electricity tariffs, smart grid Attachment Size

28

Revenues from Ancillary Services and the Value of Operational Flexibility  

Science Conference Proceedings (OSTI)

The movement toward competitive regional wholesale power markets is creating the requirement and opportunity for generators to sell ancillary services in addition to energy. Calculation of revenues and net income from these sources is critical to assessing asset values, evaluating investments in order to obtain greater operating flexibility, and determining whether to retire or mothball units. This report reviews the status of ancillary services market development in the United States and Canada, and dem...

2002-12-02T23:59:59.000Z

29

Loads Providing Ancillary Services: Review of International Experience  

SciTech Connect

In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that customer loads can meaningfully participate in all wholesale electricity markets.

Heffner, Grayson; Goldman, Charles; Kintner-Meyer, Michael

2007-05-01T23:59:59.000Z

30

Analyzing Multiple-Product Power Markets: Simulation of Energy and Ancillary Services Prices and System Adequacy  

Science Conference Proceedings (OSTI)

The interpretation of price signals is a primary business task of power market participants, made more challenging by the shift from cost-based to bid-based pricing. This report outlines a novel pricing framework that accounts for the behavior and interaction of forward and real-time energy markets and the ancillary services required to maintain system reliability.

2000-12-01T23:59:59.000Z

31

Efficient bidding for hydro power plants in markets for energy and ancillary services  

E-Print Network (OSTI)

In order to preserve stability of electricity supply generators must provide ancillary services in addition to energy production. Hydroelectric resources have significant ancillary service capability because of their dynamic ...

Perekhodtsev, Dmitri

2006-01-01T23:59:59.000Z

32

Demonstration of Black Start Ancillary Service Certification Testing  

Science Conference Proceedings (OSTI)

This is a discussion of Black Start Tests conducted in April 1999 which then served as a demonstration project for certification of black start capability. This work is a companion effort of the EPRI Measurement of Ancillary Services from Power Plants project. Several of the summary, introductory and background paragraphs of the final report (Ref.1) for that project are reproduced here as a convenience to the reader.

1999-12-21T23:59:59.000Z

33

Measurement of Ancillary Services From Power Plants: Regulation, Load Following and Black Start  

Science Conference Proceedings (OSTI)

In the deregulated electric utility industry, it is anticipated that many ancillary services will be sold by "generators" to Operating Authorities (OAs) or Independent System Operators (ISOs). Such trade in ancillary services will require contractual agreements, and these agreements will need to specify quality and quantity of service to be supplied. This, again, means that it will be necessary to certify or measure the quality of an ancillary service to be supplied, as well as the quantity actually supp...

1999-12-10T23:59:59.000Z

34

Computer-specific metrics for the regulation and load following ancillary services  

Science Conference Proceedings (OSTI)

In competitive electricity markets, the costs for each ancillary service should be charged to those who cause the costs to be incurred with charges based on the factors that contribute to these costs. For example, the amount of generating capacity assigned to the regulation service is a function of the short-term volatility of system load. Therefore, the charges for regulation should be related to the volatility of each load, not to its average demand. This report discusses the economic efficiency and equity benefits of assessing charges on the basis of customer-specific costs (rather than the traditional billing determinants, MWh or MW), focusing on two key real-power ancillary services, regulation and load following. The authors determine the extent to which individual customers and groups of customers contribute to the system's generation requirements for these two services. In particular, they analyze load data to determine whether some customers account for shares of these two services that differ substantially from their shares of total electricity consumption.

Kirby, B.; Hirst, E.

2000-01-01T23:59:59.000Z

35

Ancillary Services in the United States: Independent System Operator (ISO) Perspective (Presentation)  

SciTech Connect

The presentation provides an overview of how increasing penetrations of variable renewable energy on the electricity grid are impacting ancillary services markets in the United States.

Cochran, J.

2013-05-01T23:59:59.000Z

36

Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable Energy (Presentation)  

SciTech Connect

The presentation provides an overview of how increasing penetrations of variable renewable energy on the electricity grid are impacting ancillary services markets in the United States.

Cochran, J.

2013-05-01T23:59:59.000Z

37

Loads Providing Ancillary Services: Review of International Experience  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LBNL -62701 ORNL/TM-2007/060 PNNL-16618 Loads Providing Ancillary Services: Review of International Experience Grayson Heffner 1 , Charles Goldman 1 , Brendan Kirby 2 and Michael Kintner-Meyer 3 1. Lawrence Berkeley National Laboratory 2. Oak Ridge National Laboratory 3. Pacific Northwest National Laboratory Environmental Energy Technologies Division May 2007 The work described in this report was coordinated by the Consortium for Electric Reliability Technology Solutions and was funded by the Office of Electricity Delivery and Energy Reliability, Transmission Reliability Program of the U.S. Department of Energy under Contract No. DE-AC02-05CH11231 (for LBNL); DE-AC0-500OR22725 (for ORNL); and DE-AC06-76RL01830 (for PNNL).

38

Effective Ancillary Services Market Designs on High Wind Power Penetration Systems: Preprint  

DOE Green Energy (OSTI)

This paper focuses on how the ancillary service market designs are implemented and how they may require changes on systems with greater penetrations of variable renewable energy suppliers, in particular wind power. Ancillary services markets have been developed in many of the restructured power system regions throughout the world. Ancillary services include the services that support the provision of energy to support power system reliability. The ancillary services markets are tied tightly to the design of the energy market and to the physics of the system and therefore careful consideration of power system economics and engineering must be considered in their design. This paper focuses on how the ancillary service market designs are implemented and how they may require changes on systems with greater penetrations of variable renewable energy suppliers, in particular wind power.

Ela, E.; Kirby, B.; Navid, N.; Smith, J. C.

2011-12-01T23:59:59.000Z

39

Hydropower Technology Roundup Report: Accommodating Wear and Tear Effects on Hydroelectric Facilities Operating to Provide Ancillary Services: TR-113584-V4  

Science Conference Proceedings (OSTI)

Ancillary services are special generation services necessary to maintain both power quality and system integrity. This report aims to provide useful information on accommodating wear and tear of hydropower units when operated to produce ancillary services. The information contained in this report can help hydro plant owners and operators: o better understand wear and tear effects, o devise strategies to mitigate these effects, and o determine the costs associated with wear and tear. This information shou...

2001-08-30T23:59:59.000Z

40

Transactive Control and Coordination of Distributed Assets for Ancillary Services  

SciTech Connect

The need to diversify energy supplies, the need to mitigate energy-related environmental impact, and the entry of electric vehicles in large numbers present challenges and opportunities to power system professionals. Wind and solar power provide many benefits, and to reap the benefits the resulting increased variability—forecasted as well as unforecasted—should be addressed. Demand resources are receiving increasing attention as one means of providing the grid balancing services. Control and coordination of a large number (~millions) of distributed smart grid assets requires innovative approaches. One such is transactive control and coordination (TC2)—a distributed, agent-based incentive and control system. The TC2 paradigm is to create a market system with the following characteristics: • Participation should be entirely voluntary. • The participant decides at what price s/he is willing to participate. • The bids and responses are automated. Such an approach has been developed and demonstrated by Pacific Northwest National Laboratory for energy markets. It is the purpose of this project to develop a similar approach for ancillary services. In this report, the following ancillary services are considered: • spinning reserve • ramping • regulation. These services are to be provided by the following devices: • refrigerators • water heaters • clothes dryers • variable speed drives. The important results are summarized below: The regulation signal can be divided into an energy-neutral high frequency component and a low frequency component. The high frequency component is particularly well suited for demand resources. The low frequency component, which carries energy non-neutrality, can be handled by a combination of generators and demand resources. An explicit method for such a separation is obtained from an exponentially weighted moving average filter. Causal filters (i.e., filters that process only present and past values of a signal) introduce delays that can be issues in some signal processing applications that treat the high frequency part as a noise to be eliminated. For regulation, the high frequency component is an essential part of the signal. The delay in the low frequency component is not a problem. A stochastic self-dispatch algorithm determines the response of the devices to the regulation signal. • In an ensemble of devices under normal operation, some devices turn on and some turn off in any time interval. Demand response necessitates turning off devices that would normally be on, or turning on devices that would normally be off. Over time, some of these would have turned off on their own. A formalism to determine expectation values under a combination of natural and forced attrition has been developed. This formalism provides a mechanism for accomplishing a desired power profile within a bid period. In particular, a method to minimize regulation requirement can be developed. The formulation provides valuable insights into control. • Some ancillary services—ramping to absorb unforecasted increase in renewable generation, and regulation down—require the demand resources to increase their energy use. Some resources such as HVAC systems can do this readily, whereas some others require enabling technology. Even without such technology, it is possible to arrange refrigerators and water heaters to have an energy debt and be ready to increase their energy use. A transactive bid mechanism of revolving debt can be developed for this purpose. Dramatic changes in control systems, architecture and markets are expected in the electrical grid. The technical capabilities of a large number of devices interacting with the grid are changing. While it is too early to describe complete solutions, TC2 has attractive features suitable for adapting to the changes. The analyses in this report and the activities planned for FY 14 and beyond are designed to facilitate this transition.

Subbarao, Krishnappa; Fuller, Jason C.; Kalsi, Karanjit; Somani, Abhishek; Pratt, Robert G.; Widergren, Steven E.; Chassin, David P.

2013-09-18T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Mechanisms for Evaluating the Role of Hydroelectric Generation in Ancillary Service Markets  

Science Conference Proceedings (OSTI)

New opportunities to provide system support and ancillary services are attracting the interest of hydroelectric generators. This research focuses primarily on three classes of reserve service (regulation, spinning, and supplemental reserves) and their relation to real power production planning.

1998-12-16T23:59:59.000Z

42

Audit of Subsidized Ancillary Services at the Nevada Test Site, WR-B-95-08  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF SUBSIDIZED ANCILLARY SERVICES AT THE NEVADA TEST SITE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov U. S. Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/refshelf.html Your comments would be appreciated and can be provided on the Customer Response Form attached to the report.

43

Application of EPRI's Transmission Services Costing Framework to the Development of Open Access Transmission Tariffs  

Science Conference Proceedings (OSTI)

Public utilities in the United States are expected to provide transmission services and ancillary services to eligible customers. This report documents how Centerior Energy Corporation developed a network integration transmission service tariff, a point-to-point transmission service tariff, and four ancillary services tariffs by applying EPRI's Transmission Services Costing Framework.

1996-03-09T23:59:59.000Z

44

Loads Providing Ancillary Services: Review of InternationalExperience-- Technical Appendix: Market Descriptions  

Science Conference Proceedings (OSTI)

In this study, we examine the arrangements for andexperiences of end-use loads providing ancillary services (AS) in fiveelectricity markets: Australia, the United Kingdom (UK), the Nordicmarket, and the ERCOT and PJM markets in the United States. Our objectivein undertaking this review of international experience was to identifyspecific approaches or market designs that have enabled customer loads toeffectively deliver various ancillary services (AS) products. We hopethat this report will contribute to the ongoing discussion in the U.S.and elsewhere regarding what institutional and technical developments areneeded to ensure that customer loads can meaningfully participate in allwholesale electricity markets.

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-05-01T23:59:59.000Z

45

Integrated System Transmission and Ancillary Services Rate Calculation  

NLE Websites -- All DOE Office Websites (Extended Search)

(1) B. Generation Net Plant Costs 474,040,718 (2) C. Annual Cost of Generation 87,735,456 (A x B) D. Plant Capacity (kW) 2,372,000 E. CostkW (kW-Yr) 36.99 (C D) F....

46

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

AESP Brown Bag Seminar, April 18. FERC 2002a. StandardizedService and Wholesale Electric Market Design, FERC WorkingPaper FERC, March. FERC 2005. Principles for Efficient and

Heffner, Grayson

2008-01-01T23:59:59.000Z

47

ORNL/TM-2007/060 Loads Providing Ancillary Services  

E-Print Network (OSTI)

appear in different zones at the same time and (b) hot water loads. 3.2. Technologies The newest engines have these characteristics. The costs for the discrete fuel cell11 technology are interpolated dominant technologies. Research shows that no fuel cell or micro turbine adoption takes place in our

48

Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service  

DOE Green Energy (OSTI)

Frequency responsive reserve is the autonomous response of generators and demand response to deviations of system frequency, usually as a result of the instantaneous outage of a large supplier. Frequency responsive reserve arrests the frequency decline resulting in the stabilization of system frequency, and avoids the triggering of under-frequency load-shedding or the reaching of unstable frequencies that could ultimately lead to system blackouts. It is a crucial service required to maintain a reliable and secure power system. Regions with restructured electricity markets have historically had a lack of incentives for frequency responsive reserve because generators inherently provided the response and on large interconnected systems, more than sufficient response has been available. This may not be the case in future systems due to new technologies and declining response. This paper discusses the issues that can occur without proper incentives and even disincentives, and proposes alternatives to introduce incentives for resources to provide frequency responsive reserve to ensure an efficient and reliable power system.

Ela, E.; Milligan, M.; Kirby, B.; Tuohy, A.; Brooks, D.

2012-03-01T23:59:59.000Z

49

Spot pricing of electricity and ancillary services in a competitive California market  

Science Conference Proceedings (OSTI)

Typically, in competitive electricity markets, the vertically integrated utilities that were responsible for ensuring system reliability in their own service territories, or groups of territories, cease to exist. The burden falls to an independent system operator (ISO) to ensure that enough ancillary services (AS) are available for safe, stable, and reliable operation of the grid, typically defined, in part, as compliance with officially approved engineering specifications for minimum levels of AS. In order to characterize the behavior of market participants (generators, retailers, and an ISO) in a competitive electricity market with reliability requirements, spot markets for both electricity and AS are modeled. By assuming that each participant seeks to maximize its wealth and that all markets clear, we solve for the optimal quantities of electricity and AS traded in the spot market by all participants, as well as the market clearing prices for each.

Siddiqui, A.S.; Marnay, C.; Khavkin, M.

2000-11-01T23:59:59.000Z

50

MISO Unlocks Billions in Savings Through the Application of Operations Research for Energy and Ancillary Services Markets  

Science Conference Proceedings (OSTI)

Over the past few years, the Midwest Independent Transmission System Operator, Inc. (MISO) has transformed the electric utility industry in 13 Midwestern US states through the development and implementation of energy and ancillary services markets. MISO ... Keywords: Lagrangian, OR in a region, demand, dynamic programming, electricity, energy, integer programming, linear programming, optimization, performance, planning, reliability, supply, transmission, values

Brian Carlson; Yonghong Chen; Mingguo Hong; Roy Jones; Kevin Larson; Xingwang Ma; Peter Nieuwesteeg; Haili Song; Kimberly Sperry; Matthew Tackett; Doug Taylor; Jie Wan; Eugene Zak

2012-01-01T23:59:59.000Z

51

Wind Farm Power Fluctuations, Ancillary Services, and System Operating Impact Analysis Activities in the United States: Preprint  

SciTech Connect

With ever increasing penetration of wind capacity and growing interest in wind power by electric utilities and other power providers, questions about the impacts and costs associated with maintaining a stable grid is receiving lots of attention. These issues are important, both in competitive and regulated monopoly markets.To evaluate the range of ancillary service impact of wind power plants, wind power plant output fluctuations on the order of seconds to minutes must be known. However, the data required for a credible analysis has not been widely available. The National Renewable Energy Laboratory (NREL), through its own efforts, and in conjunction with a wide group of stakeholders including other national labs, consultants, developers, utilities, and the non-profit Utility Wind Interest Group, has initiated measurement and analysis activities. The efforts are ongoing. While final system-cost results are not available, this paper will describe the progress to date and present typical results and statistical analysis. In addition, methods will be explained with the aim of soliciting feedback from others looking at similar issues worldwide.

Parsons, B. K. (National Renewable Energy Laboratory); Wan, Y. (National Renewable Energy Laboratory); Kirby, B. (Oak Ridge National Laboratory)

2001-07-01T23:59:59.000Z

52

Short-Term Power Fluctuation of Wind Turbines: Analyzing Data from the German 250-MW Measurement Program from the Ancillary Services Viewpoint  

SciTech Connect

Short-term power fluctuations from wind farms may affect interconnected-grid operating costs and stability. With the increasing availability of wind power worldwide, this has become a concern for some utilities. Under electric industry restructuring in the United States, the impact of these fluctuations will be evaluated by examining provisions and costs of ancillary services for wind power. However, the magnitude of the impact and the effect of aggregation of multiple turbines are not well quantified due to a lack of actual wind farm power data. This paper analyzes individual turbine and aggregate power output data from the German ''250-MW Wind'' data project. Electric system load following and regulation impacts are examined as a function of the number of turbines and turbine spacing in order to quantify the impacts of aggregation. The results show a significant decrease in the relative system regulation burden with increasing number of turbines, even if the turbines are in close proximity.

Ernst, B. (Institut fur Solare Energieversorgungstechnik); Wan, Y.-H. (National Renewable Energy Laboratory); Kirby, B. (Oak Ridge National Laboratory)

1999-07-26T23:59:59.000Z

53

Malaysian food service organisations and transaction cost.  

E-Print Network (OSTI)

??Portfolio includes: paper 1. Malaysian food service organisations and transaction cost: literature review  – paper 2. Malaysian food service organisations and transaction cost: comparative analysis… (more)

Lok, Stanley Yap Peng.

2007-01-01T23:59:59.000Z

54

Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions  

E-Print Network (OSTI)

half-hour imbalance energy markets. Prices are set by usingspot prices, dispatch targets for the energy market, andEnergy Services Provider who, as the market participant, receives the spot price

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-01-01T23:59:59.000Z

55

Using Dimmable Lighting for Regulation Capacity and Non-Spinning Reserves in the Ancillary Services Market. A Feasibility Study.  

Science Conference Proceedings (OSTI)

The objective of this Feasibility Study was to identify the potential of dimmable lighting for providing regulation capacity and contingency reserves if massively-deployed throughout the State. We found that one half of the total electric lighting load in the California commercial sector is bottled up in larger buildings that are greater an 50,000 square feet. Retrofitting large California buildings with dimmable lighting to enable fast DR lighting would require an investment of about $1.8 billion and a"fleet" of about 56 million dimming ballasts. By upgrading the existing installed base of lighting and controls (primarily in large commercial facilities) a substantial amount of ancillary services could be provided. Though not widely deployed, today's state-of-the art lighting systems, control systems and communication networks could be used for this application. The same lighting control equipment that is appropriate for fast DR is also appropriate for achieving energy efficiency with lighting on a daily basis. Thus fast DR can leverage the capabilities that are provided by a conventional dimming lighting control system. If dimmable lighting were massively deployed throughout large California buildings (because mandated by law, for example) dimmable lighting could realistically supply 380 MW of non-spinning reserve, 47percent of the total non-spinning reserves needed in 2007.

Rubinstein, Francis; Xiaolei, Li; Watson, David S.

2010-12-03T23:59:59.000Z

56

Service Provider Competition: Delay Cost Structure, Segmentation, and Cost Advantage  

Science Conference Proceedings (OSTI)

We model competition between two providers who serve delay-sensitive customers. We compare a generalized delay cost structure, where a customer's delay cost depends on her service valuation, with the traditional additive delay cost structure, where the ... Keywords: delay cost structure, service competition, value-based market segmentation

Maxim Afanasyev; Haim Mendelson

2010-04-01T23:59:59.000Z

57

Implications of Energy and Ancillary Service Market Structure for Hydroelectric Generation: A Survey of U.S. ISOs  

Science Conference Proceedings (OSTI)

Hydroelectric's superior technical capabilities -- flexibility, fast response, efficiency -- make it especially well suited to providing reserve services in restructured and deregulated markets. A generating unit providing reserves in a deregulated market must understand not only the energy market, but also the interrelated markets for several different classes of reserve services. This report investigates how five U.S. independent service providers (IPOs) provide reserve services.

2001-08-22T23:59:59.000Z

58

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Loveland Area Project Firm Power Rates Transmission and Ancillary Services Rates 2012 Rate Adjustment-Transmission and Ancillary Services 2010 Rate Adjustment-Firm Power 2009...

59

Ancillary Services Markets in California  

E-Print Network (OSTI)

Technologies, Office of Energy Management Division of the U.S. Department of Energy under Contract No. DE-AC03

60

Ancillary services market in California  

E-Print Network (OSTI)

NAERO NERC PG&E PX REPA RMR RRC SCE SDG&E WSCC Area Controlmeet NERC and its own RRC reliability criteria. Separation

Gomez, Tomas; Marnay, Chris; Siddiqui, Afzal; Liew, Lucy; Khavkin, Mark

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network (OSTI)

Compressor, components and distribution FM FM FMD 17 STEAM Distribution to building systems FM FM C 18 STEAM Distribution to department equipment FM FMD FMD 19 VACUUM DISTRIBUTION Department SERVICE CONNECTION FM C C 13 PRIMARY ELECTRICAL SERVICE CONNECTIONS FM C C 14 STEAM UTILITY

Gulliver, Robert

62

Smarter Meters Help Customers Budget Electric Service Costs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tri-State Smart Grid Investment Grant Tri-State Smart Grid Investment Grant 1 Tri-State's service area includes parts of Fannin County, Georgia; Polk County, Tennessee; and Cherokee County, North Carolina. Smarter Meters Help Customers Budget Electric Service Costs Tri-State Electric Membership Cooperative (Tri-State) is a distribution rural electric cooperative that primarily serves more than 12,000 rural customers, many of whom have low-incomes living at or near poverty level across a multi-state region (see map). Under their smart grid project, Tri-State has replaced conventional electromechanical meters with solid-state smart meters and implemented advanced electricity service programs in order to give customers greater control over their energy use and costs.

63

Price caps for standard offer service: A hidden stranded cost  

Science Conference Proceedings (OSTI)

Some utility commissions or legislatures, concerned about mis-estimating the market line when calculating stranded costs, are choosing to require a price-capped standard offer service (SOS) to be offered by utilities in the competitive marketplace. This grants to customers the flexibility to switch from a fixed-price alternative with the utility to (or even to and from) a non-utility power supplier. Given the enormous uncertainty in future power market prices, this flexibility, which is being bestowed free-of-charge to customers, may prove to be of considerable value. Valuation of this SOS flexibility using call option techniques shows that this can be a non-trivial fraction of total stranded costs. The costs of price-capped SOS can be ameliorated through the structure of the price cap. This article describes the option-based techniques for valuing SOS and some approaches to limiting its cost to utilities.

Graves, F.; Liu, P. [Brattle Group, Cambridge, MA (United States)]|[Brattle Group, Washington, DC (United States)]|[Brattle Group, London (United Kingdom)

1998-12-01T23:59:59.000Z

64

LANSCE | Lujan Center | Ancillary Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Ancillary Equipment Ancillary Equipment For general questions, please contact the Lujan Center Sample Environments responsible: Victor Fanelli | vfanelli@lanl.gov | 505.667.8755 Sample and Equipment Shipping Instructions For questions regarding shipping procedures, contact Lujan Center Experiment Coordinator: Leilani Conradson | leilani@lanl.gov | 505.665.9505 Low Temperature Equipment Specifications Flight Path/Instrument Compatibility Responsible Displex closed-cycle refrigerators Tmin= 4 K to 12 K Tmax= 300 K to 340 K 11 - Asterix 04 - HIPPO 03 - HIPD 10 - LQD 02 - SMARTS Victor Fanelli vfanelli@lanl.gov Or particular instrument scientist Top loading closed-cycle refrigerator T = 10 K to 500 K option of in situ gas adsorption cell 07 - FDS Luke Daemon lld@lanl.gov Monika Hartl hartl@lanl.gov

65

Analyzing the level of service and cost trade-offs in cold chain transportation  

E-Print Network (OSTI)

This thesis discusses the tradeoff between transportation cost and the level of service in cold chain transportation. Its purpose is to find the relationship between transportation cost and the level of service in cold ...

Liu, Saiqi

2009-01-01T23:59:59.000Z

66

Ancillary-service details: operating reserves  

Science Conference Proceedings (OSTI)

Operating reserves are the front lines in the defense of bulk-power systems against major generation and transmission outages. Operating reserves are provided by generating units that can increase their output rapidly to restore the system to generation/load balance after a major disturbance occurs. Dramatic changes are under way in the U.S. electricity sector, in particular the unbundling of generation from transmission and the increasingly competitive nature of bulk-power markets. Therefore, it is important to revisit the industry`s definitions of, procurement of, and payment for operating reserves. The procedures traditionally used by vertically integrated utilities may not serve the needs of an increasingly fragmented and competitive electricity industry. This report examines the past and current functions of, as well as the national and regional requirements for, operating reserves. We examine the data and analysis that support minimum-operating-reserve requirements. We obtained data on the number and severity of generator outages for three large U.S. electrical systems, including a power pool, a regional reliability council, and a utility. These limited data sets show a range of 15 to 40 major (>500 MW) outages a year for systems ranging in size from 20, 000 MW to 48,000 MW of peak demand. Finally, we discuss several emerging issues related to the underlying technical support for minimum operating-reserve requirements, alternative ways to pay for these reserves, the data needed to support the analysis of these requirements, and the mix of functions that are currently included within operating reserves.

Hirst, E.; Kirby, B.

1997-11-01T23:59:59.000Z

67

Competitive ancillary service procurement in California  

SciTech Connect

California has undertaken a major restructuring of its electricity utility sector. Most electricity is now sold in open markets operated by the PX and other entities. Bilateral contracting among some market participants is also permitted. A group of independent generating companies bids into these markets together with out of state resources. In addition to these markets, CAISO operates markets for both imbalance energy and AS, a quite unusual feature of the California system. These markets were initially quite chaotic and were rife with market power problems. However, various reforms have now created a system that functions well. During the restructuring process, special provisions were made to protect public purpose programs, including renewable generation.

Marnay, Chris; Siddiqui, Afzal S.; Khavkin, Mark

2000-01-01T23:59:59.000Z

68

Definition: Ancillary Service | Open Energy Information  

Open Energy Info (EERE)

(From FERC order 888-A.)1 View on Wikipedia Wikipedia Definition Related Terms transmission lines, energy, system, electricity generation, transmission line, reactive...

69

NREL: Vehicle Ancillary Loads Reduction - Laboratory Capabilities  

NLE Websites -- All DOE Office Websites (Extended Search)

VALR Lab. NREL's Vehicle Ancillary Loads Reduction Laboratory houses ADAM, our advanced thermal manikin, as well as a passenger compartment climate simulator, testing equipment...

70

A Transaction Cost Perspective of the "Software as a Service" Business Model  

Science Conference Proceedings (OSTI)

Application service providers (ASP), which host and maintain information technology (IT) applications across the Internet, offer an alternative to traditional models of IT service for user firms. We build on prior literature in transaction cost economics ... Keywords: Application Service Providers, Contract Choice, Logit Models, Transaction Cost Economics

Anjana Susarla; Anitesh Barua; Andrew Whinston

2009-09-01T23:59:59.000Z

71

Unbundling generation and transmission services for competitive electricity markets  

SciTech Connect

Ancillary services are those functions performed by the equipment and people that generate, control, and transmit electricity in support of the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission (FERC) defined such services as those `necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.` The nationwide cost of ancillary services is about $12 billion a year, roughly 10% of the cost of the energy commodity. More important than the cost, however, is the necessity of these services for bulk-power reliability and for the support of commercial transactions. FERC`s landmark Order 888 included a pro forma tariff with provision for six key ancillary services. The Interconnected Operations Services Working Group identified another six services that it felt were essential to the operation of bulk-power systems. Several groups throughput the United States have created or are forming independent system operators, which will be responsible for reliability and commerce. To date, the electricity industry (including traditional vertically integrated utilities, distribution utilities, power markets and brokers, customers, and state and federal regulators) has paid insufficient attention to these services. Although the industry had made substantial progress in identifying and defining the key services, much remains to be doe to specify methods to measure the production, delivery, and consumption of these services; to identify the costs and cost-allocation factors for these services; and to develop market and operating rules for their provision and pricing. Developing metrics, determining costs, and setting pricing rules are important because most of these ancillary services are produced by the same pieces of equipment that produce the basic electricity commodity. Thus, the production of energy and ancillary services is highly interactive, sometimes complementary and sometimes competing. In contrast to today`s typical time-invariant, embedded-cost prices, competitive prices for ancillary services would vary with system loads and spot prices for energy.

Hirst, E.; Kirby, B.

1998-01-01T23:59:59.000Z

72

Measuring Cost Variability in Provision of Transit Service  

E-Print Network (OSTI)

W. , and S. R. Mundle. Peak-Base Cost Allocation Models. In29–33. Reilly, J. M. Transit Costs During Peak and Off-PeakHow to Allocate Bus Route Costs. Transit, Vol. 5, No. 2,

Taylor, Brian D.; Garrett, Mark; Iseki, Hiroyuki

2010-01-01T23:59:59.000Z

73

Measuring Cost Variability in Provision of Transit Service  

E-Print Network (OSTI)

pro- vide separate cost estimates for two periods—the peakvehicle-hour unit-cost estimates for the peak and base= vehicle-hour unit-cost estimate for peak, U BVH = vehicle-

Taylor, Brian D.; Garrett, Mark; Iseki, Hiroyuki

2010-01-01T23:59:59.000Z

74

OPTIMIZING TRANSMISSION SERVICE COST OF KHUZESTAN REGIONAL GRID BASED ON NSGA?II ALGORITHM  

Science Conference Proceedings (OSTI)

Any plan for modeling the components of transmission service costs should be able to consider congestion as well as loss cost. Assessing the real value of congestion and loss costs in each network has a substantial contribution to analyze the grid’s weaknesses in order to release capacity of power network. As much as the amount of congestion and loss costs in the transmission grid reduces the amount of power passing through transmission lines increases. Therefore

Alireza Tavakoli Shooshtari; Mahmood Joorabian; Armin Ebrahimi Milani; Arash Gholamzadeh

2011-01-01T23:59:59.000Z

75

Strategies for cost reduction in procuring trucking services  

E-Print Network (OSTI)

This thesis analyzed truckload shipment transactions from 2006 to 2008 in order to compare planned procurement activity to actual procurement activity. The research specifically focused on three costs: Primary, Actual and ...

Castro Izaguirre, Carlo Gustavo

2009-01-01T23:59:59.000Z

76

User's manual: GCOST: A gas cost-of-service program: Version 1. 0  

SciTech Connect

The process of rate design for a gas distribution utility requires the use of cost-of-service studies. A cost-of-service study finds the various costs of serving all of a utility's customers, and allocates these costs to individual customer classes. Costs include investments in plant and equipment, operating expenses, and taxes. There are two distinct approaches that underlie cost-of-service studies. One approach is based on marginal costs and the other on embedded costs. The marginal-cost allocation can be defined as the incremental cost of adding a single customer to the system. The embedded cost is the customer's share of historical costs. Of the two approaches, the latter is easier to implement and traditionally has been used for rate-making purposes. GCOST is designed to perform cost-of-service studies using the traditional embedded cost approach. It accepts accounting, financial, and operating data as user input. It then allocates the various items of utility plant and operating expenses to each customer class according to user-specified methods. For each cost item or account, the user has the option of specifying an allocation method or formula. This flexibility allows the user to experiment with different combinations of allocation methods. GCOST is interfaced with a database management program, which is used to prepare input data files prior to running GCOST. The user has the choice of either using DBMGR, developed by NRRI, or the commercial software dBASE III PLUS, as the database management program. GCOST is designed for use on an IBM Personal Computer XT, AT, or compatible system.

Harunuzzaman, M.; Iyyuni, G.

1989-05-01T23:59:59.000Z

77

How to Evaluate the Costs and Benefits of Participating in Coordinated Transportation Services; A Coordination Manual  

E-Print Network (OSTI)

This Manual focuses on the coordination of transportation resources by social service and community transportation providers. The Manual is designed to assist such providers to understand the potential benefits of coordination, to compare current cost and service patterns to those offered by other providers " to understand the costs incurred when participating in various coordination options, and to compute prices to charge to other agepcies when selling transportation services. The Manual has three messages: 1) in many coordination options there are trade-offs that can or must be made between cost and service variables; 2) in order to participate in coordination programs, agencies must understand all costs which they will continue to incur as well as those that will be experienced for the first time; 3) coordination can be a complex and complicated process which requires serlOUS attention to organizational, administrative and financial

P. Rlorming Organilo. Ion Nomo

1981-01-01T23:59:59.000Z

78

Strategic Analysis of Railroad Rate, Cost, and Service Prospects: Conflict or Cooperation  

Science Conference Proceedings (OSTI)

The railroad industry has consolidated into a handful of recently merged mega-carriers, facing mountains of debt, intense pressure to improve financial returns, and wary shippers stung by episodes of poor service. Power generators, too, have been consolidating and are operating under heightened cost pressures. How might these conflicting cost, service, and profit pressures play out over the next five years? This study analyzes these factors for representative movements of eastern and western coal by all ...

1999-11-15T23:59:59.000Z

79

A methodology framework for calculating the cost of e-government services  

Science Conference Proceedings (OSTI)

This paper proposes a structured framework for calculating the cost of e-Government services, based on the complementary application of the IDEF0 modelling tool and the Activity-Based Costing technique. The motivation for this research effort was derived ...

Elias A. Hadzilias

2005-03-01T23:59:59.000Z

80

ORISE: Delivering Cost Savings and Customer Service with Off-the-Shelf  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost Savings and Customer Service Cost Savings and Customer Service ORISE delivers Cost Savings and Customer Service with Off-the-Shelf Software The Oak Ridge Institute for Science and Education's (ORISE) Scientific Peer Review Program is no different than any other organization striving to do more with less in the current economy. With smaller budgets and faster turnaround needed for proposal reviews, utilizing Web-based collaboration tools to share information is necessary. Therefore, the ORISE team built a project tracking and management system with off-the-shelf products-an immediate cost and time-saver. In a recent example involving the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE), ORISE conducted an annual merit review-a complete and objective examination of DOE funded projects

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Survey of Technologies and Cost Estimates for Residential Electricity Services Jason W. Black, Marija Ilic, IEEE Fellow  

E-Print Network (OSTI)

Survey of Technologies and Cost Estimates for Residential Electricity Services Jason W. Black This survey contains a sample of the available technologies for implementing residential electricity services understanding of the potential for implementation of residential services. The estimation of the costs

Ilic, Marija D.

82

Services Provided for Boyce Thompson Institute Research Laboratories Service Description Unit Unit Cost  

E-Print Network (OSTI)

our growth facilities found by visiting: http://bti.cornell.edu/Greenhouse.php Per square foot See Cost Media Preparation Maintenance of regular media inventory in each lab, media requests, preparation at the bench. Per lab member $103.00 Glassware Dirty glassware is collected, cleaned, autoclaved, and returned

Pawlowski, Wojtek

83

NREL: Vehicle Ancillary Loads Reduction - Air Conditioning and Emissions  

NLE Websites -- All DOE Office Websites (Extended Search)

Conditioning and Emissions Conditioning and Emissions Air conditioning and indirect emissions go together in the sense that when a vehicle's air conditioning system is in use, fuel economy declines. When more petroleum fuel is burned, more pollution and greenhouse gases are emitted. An additional, "direct" source of greenhouse gas emissions is the refrigerant used in air conditioning. Called HFC-134a, this pressurized gas tends to seep through tiny openings and escapes into the atmosphere. It can also escape during routine service procedures such as system recharging. NREL's Vehicle Ancillary Loads Reduction team applied its vehicle systems modeling expertise in a study to predict fuel consumption and indirect emissions resulting from the use of vehicle air conditioning. The analysis

84

Pricing and Cost Recovery for Internet Services: Practical Review, Classification, and Application of Relevant Models  

Science Conference Proceedings (OSTI)

Suitable pricing models for Internet services represent one of the main prerequisites for a successfully running implementation of a charging and accounting system. This paper introduces general aspects influencing the choice of a pricing model in practical ... Keywords: Internet pricing, auction pricing, cost recovery, peering agreements

Burkhard Stiller; Peter Reichl; Simon Leinen

2001-09-01T23:59:59.000Z

85

Managing the Cost, Energy Consumption, and Carbon Footprint of Internet Services  

E-Print Network (OSTI)

enough to be useful even in the absence of brown energy caps, different electricity prices, or green ser- vice and realistic data on energy and carbon offset prices (gathered from various sources distribution based on hourly electricity prices to reduce the energy cost of Internet services [3]. We

Martonosi, Margaret

86

Update on maintenance and service costs of commercial building ground-source heat pump systems  

Science Conference Proceedings (OSTI)

An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

Cane, D.; Garnet, J.M.

2000-07-01T23:59:59.000Z

87

NREL: Vehicle Ancillary Loads Reduction - Integrated Modeling  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Modeling Integrated Modeling NREL's Vehicle Ancillary Loads Reduction (VALR) team predicts the impact of advanced vehicle cooling technologies before testing by using an integrated modeling process. Evaluating the heat load on a vehicle under real world conditions is a difficult task. An accepted method to evaluate passenger compartment airflow and heat transfer is computational fluid dynamics. (CFD). Combining analytical models with CFD provides a powerful tool to assist industry both on current vehicles and on future design studies. Flow chart showing the vehicle integrated modeling process which considers solar radiation, air conditioning, and vehicles with CAD, glazing, cabin thermal/fluid, and thermal comfort modeling tools. Results are provided for fuel economy, tailpipe emissions and occupant thermal comfort.

88

NREL: Vehicle Ancillary Loads Reduction - Physiological Model  

NLE Websites -- All DOE Office Websites (Extended Search)

Physiological Model Physiological Model The Vehicle Ancillary Loads Reduction team developed a three-dimensional model to simulate human internal thermal physiological systems (muscle, blood, etc.) and thermoregulatory responses such as metabolic heat generation. The model was developed with ANSYS, a finite element software which computes heat flow by conduction, convection, and mass transport of the blood. A human tissue system model represents the human body, including the physiological and thermal properties of the tissues. The arms and legs consist of bone, muscle, fat, and skin. There are additional lung, abdominal, and brain tissues in the torso and head zones. The model calculates the conduction heat transfer based on the temperature gradients between the tissue nodes. Blood flow is modeled with a network of supply

89

EIS-0385: Ancillary Facilities for the Richton Site of the Strategic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0385: Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi EIS-0385: Ancillary Facilities for the Richton Site of the Strategic Petroleum...

90

Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service  

Science Conference Proceedings (OSTI)

Frequency responsive reserve is the autonomous response of generators and demand response to deviations of system frequency, usually as a result of the instantaneous outage of a large supplier. This article discusses the issues that can occur without proper incentives and even disincentives, and proposes alternatives to introduce incentives for resources to provide frequency responsive reserve to ensure an efficient and reliable power system.

Ela, E.; Tuohy, A.; Milligan, M.; Kirby, B.; Brooks, D.

2012-05-01T23:59:59.000Z

91

Ancillary services and operation of multi-terminal HVdc systems  

E-Print Network (OSTI)

, stability and protection. Economic dispatch. HVDC transmission. (Lecture - problems 3 hours.) Traditional and filters. Magnetics. Applications in motor controls in industrial systems, energy conversion, HVDC transmis

Ernst, Damien

92

Multi-terminal HVDC systems and ancillary services  

E-Print Network (OSTI)

-LINEAR CONTROL AND STABILIZATION OF VSC-HVDC TRANSMISSION SYSTEMS Commande Non Linéaire et Stabilisation des Systèmes de Transmission VSC-HVDC Soutenance le jeudi 15 mars 2012 à 14:00 devant les membres du jury : M., Petit M., and Kaczmarek R., "Per- formance enhancement and robustness assessment of VSC-HVDC trans

Ernst, Damien

93

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

Demand response in the Energy Markets”, Copenhagen, 27 May.in capacity or energy markets – a steady revenue stream andand a small spot energy market together with other essential

Heffner, Grayson

2008-01-01T23:59:59.000Z

94

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

Operations, Brendan Kirby, ORNL/TM-2006-512, July. PJM 2005.Whitepaper on PJM Forward Energy Reserve: A Centralized CallManager, Retail Markets, PJM Interconnection LLC, January

Heffner, Grayson

2008-01-01T23:59:59.000Z

95

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

can produce considerable real-time price volatility; Marketreceive a real-time Locational Marginal Price (LMP) greatermarkets in real-time and set the balancing price. These same

Heffner, Grayson

2008-01-01T23:59:59.000Z

96

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

real-time energy balancing market calculates clearing pricescurtailed energy priced at the sport market price, which canMarginal Price Market Clearing Price of Energy (Texas)

Heffner, Grayson

2008-01-01T23:59:59.000Z

97

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

constraints in a hydro-dominated energy-only market create aservice markets. Energy-limited (e.g. some hydro resources)

Heffner, Grayson

2008-01-01T23:59:59.000Z

98

1 Vehicle-to-grid systems: ancillary services and communications  

E-Print Network (OSTI)

, 17] in a distributed vehicle-to-grid (V2G) infrastructure. Our focus in this chapter is on EVs' grid that facilitate efficient and practical V2G systems in future smart grid systems. The rest of this chapter expertise focuses on automated tracking and billing of many small transactions distributed over space

Huang, Jianwei

99

Reference Design Description and Cost Evaluation for Compressed Air Energy Storage Systems  

Science Conference Proceedings (OSTI)

Compressed-air energy storage (CAES) is a valuable solution for mitigating the current challenges of renewable-power variability, facilitating higher renewable penetration levels, enhancing grid reliability, and improving the utilization of transmission and generation assets. However, capital costs play a critical role in evaluating the overall CAES value proposition, at least relative to direct-market revenues (energy and ancillary services). Although the first U.S. CAES plant in Alabama was built at co...

2011-12-21T23:59:59.000Z

100

NREL: Vehicle Ancillary Loads Reduction - About the Project  

NLE Websites -- All DOE Office Websites (Extended Search)

same effect on fuel cell power sources of the future. The largest ancillary load is the air-conditioning system when it is operating. (Typically it imposes a mechanical load of...

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Ancillary effects of selected acid deposition control policies  

SciTech Connect

NAPAP is examining a number of potential ways to reduce the precursors (sulfur dioxide and nitrogen oxides) to acid deposition. However, the policies to reduce acid deposition will have other physical, biological and economic effects unrelated to acid deposition. For example, control policies that reduce sulfur dioxide emissions may also increase visibility. The effects of an acid deposition policy that are unrelated to acid deposition are referred to as ''ancillary'' effects. This reserch identifies and characterizes the principle physical and economic ancillary effects associated with acid deposition control and mitigation policies. In this study the ancillary benefits associated with four specific acid deposition policy options were investigated. The four policy options investigated are: (1) flue gas desulfurization, (2) coal blending or switching, (3) reductions in automobile emissions of NO/sub x/, and (4) lake liming. Potential ancillary benefits of each option were identified and characterized. Particular attention was paid to the literature on economic valuation of potential ancillary effects.

Moe, R.J.; Lyke, A.J.; Nesse, R.J.

1986-08-01T23:59:59.000Z

102

Costs and Emissions Associated with Plug-In Hybrid Electric Vehicle Charging in the Xcel Energy Colorado Service Territory  

NLE Websites -- All DOE Office Websites (Extended Search)

Costs and Emissions Costs and Emissions Associated with Plug-In Hybrid Electric Vehicle Charging in the Xcel Energy Colorado Service Territory K. Parks, P. Denholm, and T. Markel Technical Report NREL/TP-640-41410 May 2007 NREL is operated by Midwest Research Institute â—Ź Battelle Contract No. DE-AC36-99-GO10337 Costs and Emissions Associated with Plug-In Hybrid Electric Vehicle Charging in the Xcel Energy Colorado Service Territory K. Parks, P. Denholm, and T. Markel Prepared under Task No. WR61.2001 Technical Report NREL/TP-640-41410 May 2007 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by Midwest Research Institute * Battelle

103

Cost of stockouts in the microprocessor business and its impact in determining the optimal service level/  

E-Print Network (OSTI)

In order to develop optimal inventory policies, it is essential to know the consequences of stockouts and the costs related to each kind of stockout; at Intel, however, such costs have not yet been quantified. The primary ...

Sonnet, Maria Claudia

2005-01-01T23:59:59.000Z

104

A simplified and scalable should-cost tool in the oilfield services industry  

E-Print Network (OSTI)

Third party spend accounts for a significant amount of a business' costs. When procuring unique, highly-engineered components, this cost is often negotiated with suppliers during the procurement process. Due to the limited ...

Mealer, Clayton M

2013-01-01T23:59:59.000Z

105

Fleet servicing facilities for servicing, maintaining, and testing rail and truck radioactive waste transport systems: functional requirements, technical design concepts and options cost estimates and comparisons  

Science Conference Proceedings (OSTI)

This is a resource document which examines feasibility design concepts and feasibility studies of a Fleet Servicing Facility (FSF). Such a facility is intended to be used for routine servicing, preventive maintenance, and for performing requalification license compliance tests and inspections, minor repairs, and decontamination of both the transportation casks and their associated rail cars or tractor-trailers. None of the United States' waste handling plants presently receiving radioactive wastes have an on-site FSF, nor is there an existing third party facility providing these services. This situation has caused the General Accounting Office to express concern regarding the quality of waste transport system maintenance once the system is placed into service. Thus, a need is indicated for FSF's, or their equivalent, at various radioactive materials receiving sites. In this report, three forms of FSF's solely for spent fuel transport systems were examined: independent, integrated, and colocated. The independent concept was already the subject of a detailed report and is extensively referenced in this document so that capital cost comparisons of the three concepts could be made. These facilities probably could service high-level, intermediate-level, low-level, or other waste transportation systems with minor modification, but this study did not include any system other than spent fuel. Both the Integrated and Colocated concepts were assumed to be associated with some radioactive materials handling facility such as an AFR repository.

Watson, C.D.; Hudson, B.J.; Keith, D.A.; Preston, M.K. Jr.; McCreery, P.N.; Knox, W.; Easterling, E.M.; Lamprey, A.S.; Wiedemann, G.

1980-05-01T23:59:59.000Z

106

Electricity prices in a competitive environment: Marginal cost pricing of generation services and financial status of electric utilities. A preliminary analysis through 2015  

SciTech Connect

The emergence of competitive markets for electricity generation services is changing the way that electricity is and will be priced in the United States. This report presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated {open_quotes}cost-of-service{close_quotes} pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity patterns, production costs, and the financial integrity of electricity suppliers? This study is not intended to be a cost-benefit analysis of wholesale or retail competition, nor does this report include an analysis of the macroeconomic impacts of competitive electricity prices.

1997-08-01T23:59:59.000Z

107

NREL: Vehicles and Fuels Research - Vehicle Ancillary Loads Reduction  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Research Search More Search Options Site Map Photo of Advanced Automotive Manikin Reducing fuel consumption by air conditioning systems is the focus of Vehicle Ancillary Loads Reduction (VALR) activities at NREL. About 7 billion gallons of fuel-about 5.5% of total national light-duty vehicle fuel use-are used annually just to cool light-duty vehicles in the United States. That's why our VALR team works with industry to help increase fuel economy and reduce tailpipe emissions by reducing the ancillary loads requirements in vehicles while maintaining the thermal comfort of the passengers. Approaches include improved cabin insulation, advanced window systems, advanced cooling and venting systems, and heat generated cooling. Another focus of the VALR project is ADAM, the ADvanced Automotive Manikin

108

Solar Project Cost Report. Aratex Services, Inc. , Industrial Laundry, Fresno, California  

SciTech Connect

The system utilizes 140 Ying, flat plate, lexan glazed collectors which provide an effective aperture area of 6500 square feet. The collectors are mounted in 24 rows on the flat roof of the building. The water is pumped between the collectors and the atmospherically vented storage tank. The 12,500 gallon insulated fiberglass storage tank is located above ground on the concrete floor of a covered area of the building which is open to the outside. The solar energy system is used in conjunction with a system which recovers heat from laundry wastewater and steam condensate. The construction costs of this solar water heating system are presented. Category costs are listed by materials, labor, and subcontract costs. The subcontract costs include materials, labor, overhead and profit costs for insulation and electrical subcontractors.

1978-06-07T23:59:59.000Z

109

Examining Issues of Cost, Target Populations, and Collaborative Implementation of Medication Therapy Management Services Interventions  

E-Print Network (OSTI)

inter-organizational collaborations for community health. [organizational and community context: a framework for building evidence on dissemination and implementation in healthhealth services is strongly influenced by the organizational

Ling, Deborah S.

2012-01-01T23:59:59.000Z

110

BROOKHAVEN SCIENCE ASSOCIATES LLC 401(K) PLAN Plan Services and Costs  

E-Print Network (OSTI)

. Your plan offers a range of investment options available from the following service providers: - TIAA-CREF - Fidelity Investments TIAA-CREF Right to Direct Investments You may specify how your future contributions Document. These changes can be made: 1. Online by visiting tiaa-cref.org 2. By phone at 800 842

Johnson, Peter D.

111

Reducing Electricity and Network Cost for Online Service Providers in Geographically Located Internet Data Centers  

Science Conference Proceedings (OSTI)

Online service providers(OSPs) have Internet data centers (IDCs) in multiple geographical locations in order to satisfy global user demand. Increased data centers consume a large amount of energy, and at the same time cause increased heat dissipation, ... Keywords: Internet data centers, green computing, electricity market, load dispatching, energy proportional

Xinying Zheng; Yu Cai

2011-08-01T23:59:59.000Z

112

Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Services Services Services Overview ECS Audio/Video Conferencing Fasterdata IPv6 Network Network Performance Tools (perfSONAR) ESnet OID Registry PGP Key Service Virtual Circuits (OSCARS) DOE Grids Service Transition Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Services ESnet provides interoperable, effective, reliable, and high performance network communications infrastructure, and certain collaboration services, in support of the Office of Science (SC)'s large-scale, collaborative science programs. ESnet provides users with high bandwidth access to DOE sites and DOE's primary science collaborators including Research and

113

Strategies for Providing Distributed Resource Services to Distribution Companies  

Science Conference Proceedings (OSTI)

The emerging unbundled electricity Distribution (Disco) business will be large and capital-intensive, with balance-sheet assets of about $236 billion and annual revenues of $40-45 billion. Ancillary services operation expenditures alone will be an estimated $2 to $8 billion over the next decade This report explains how distributed resource (DR) technologies may be able to fill these ancillary services needs and describes strategies DR companies can use to market these services to Discos.

2000-03-28T23:59:59.000Z

114

Services  

Energy.gov (U.S. Department of Energy (DOE))

The Human Capital Office offers benefit, new employee orientation and some learning & development related services to all DOE employees. Additionally the Office supplies employee and labor...

115

NREL: Vehicle Ancillary Loads Reduction - Heat Generated Cooling  

NLE Websites -- All DOE Office Websites (Extended Search)

Heat Generated Cooling Heat Generated Cooling A counterintuitive but promising path to reducing the loads imposed by automotive air conditioning systems is to use heat-specifically the waste heat generated by engines. This can be an abundant source of energy, since most light-duty vehicles with combustion engines are only about 30% efficient at best. With that degree of thermal efficiency, an engine releases 70% of its fuel energy as waste heat through the coolant, exhaust gases, and engine compartment warm-up. During much of a typical drive cycle, the engine efficiency is even lower than 30%. As efficiency decreases, the amount of waste heat increases, representing a larger potential energy source. NREL's Vehicle Ancillary Loads Reduction (VALR) team is investigating a number of heat generated cooling technologies

116

Costs and Emissions Associated with Plug-In Hybrid Electric Vehicle Charging in the Xcel Energy Colorado Service Territory  

DOE Green Energy (OSTI)

The combination of high oil costs, concerns about oil security and availability, and air quality issues related to vehicle emissions are driving interest in plug-in hybrid electric vehicles (PHEVs). PHEVs are similar to conventional hybrid electric vehicles, but feature a larger battery and plug-in charger that allows electricity from the grid to replace a portion of the petroleum-fueled drive energy. PHEVs may derive a substantial fraction of their miles from grid-derived electricity, but without the range restrictions of pure battery electric vehicles. As of early 2007, production of PHEVs is essentially limited to demonstration vehicles and prototypes. However, the technology has received considerable attention from the media, national security interests, environmental organizations, and the electric power industry. The use of PHEVs would represent a significant potential shift in the use of electricity and the operation of electric power systems. Electrification of the transportation sector could increase generation capacity and transmission and distribution (T&D) requirements, especially if vehicles are charged during periods of high demand. This study is designed to evaluate several of these PHEV-charging impacts on utility system operations within the Xcel Energy Colorado service territory.

Parks, K.; Denholm, P.; Markel, T.

2007-05-01T23:59:59.000Z

117

EIS-0385: Ancillary Facilities for the Richton Site of the Strategic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85: Ancillary Facilities for the Richton Site of the 85: Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi EIS-0385: Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi Overview DOE announced the cancellation of a supplemental environmental impact statement for certain facilities associated with the 2007 selection of Richton, Mississippi, as the location of a new storage site for expanding the Strategic Petroleum Reserve. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download September 9, 2011 EIS-0385-S1: Notice of Cancellation of a Supplemental Environmental Impact Statement Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi March 21, 2008

118

TECHNOLOGY NEEDS AND STATUS ON CLOSURE OF DOE RADIOACTIVE WASTE TANK ANCILLARY SYSTEMS  

SciTech Connect

This paper summarizes the current state of art of sampling, characterizing, retrieving, transferring and treating the incidental waste and stabilizing the void space in tank ancillary systems and the needs involved with closure of these systems. The overall effort for closing tank and ancillary systems is very large and is in the initial stages of being addressed in a systematic manner. It was recognized in doing this effort, that gaps in both technology and material application for characterization and removal of residual waste and closure of ancillary systems would be identified. Great efficiencies are to be gained by defining the technology need areas early in the closure process and providing recommendations for technical programs to improve the closure strategies. Therefore, this paper will not only summarize the state of closure of ancillary systems but also provide recommendations to address the technology gaps identified in this assessment.

Burns, H; Sharon Marra, S; Christine Langton, C

2009-01-21T23:59:59.000Z

119

The cost of service quality improvements: tracking the flow of funds in social franchise networks in Myanmar  

E-Print Network (OSTI)

administrative overhead to the various lines of service. Thelines and across administrative work vs. quality supervision. Allocating overhead

2013-01-01T23:59:59.000Z

120

Will Nano-Butlers Work for Micro-Payments? Innovation in Business Services Model may Reduce Cost of Delivering Global Healthcare Services  

E-Print Network (OSTI)

This paper represents an emerging view of personalized care and patient-centric systems approach. It integrates biomedical informatics and business services. A potentially innovative model may evolve from this convergence ...

Datta, Shoumen

2008-07-31T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Audit of Fire and Emergency Medical Services Cost Sharing Between the Department of Energy and Los Alamos County, WR-B-96-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF FIRE AND EMERGENCY MEDICAL SERVICES COST SHARING BETWEEN THE DEPARTMENT OF ENERGY AND LOS ALAMOS COUNTY The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov U.S. Department of Energy Human Resources and Administration Home Page

122

FY2002 Annual Progress Report for the Light Vehicle Propulsioin & Ancillary Subsystems Program  

NLE Websites -- All DOE Office Websites (Extended Search)

& Vehicle Technologies & Vehicle Technologies 1000 Independence Avenue, S.W. Washington, DC 20585-0121 FY 2002 Annual Progress Report for the Light Vehicle Propulsion & Ancillary Subsystems Program Submitted to: U.S. Department of Energy Energy Efficiency and Renewable Energy Office of FreedomCAR & Vehicle Technologies Vehicle Systems Team Robert Kost, Team Leader January 2003 Light Vehicle Propulsion & Ancillary Subsystems Program FY 2002 Annual Progress Report CONTENTS I. INTRODUCTION ............................................................................................... 1 II. TECHNOLOGY REQUIREMENTS DEFINITION....................................... 3 A. Simulation Model Development ..................................................................... 3 1. Improvement, Validation and Application of Advanced

123

Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions  

E-Print Network (OSTI)

electric boilers of district heating systems) must shedcapabilities 42 of the district heating systems not allgreater than 5 MW) district heating schemes can quickly

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-01-01T23:59:59.000Z

124

Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions  

E-Print Network (OSTI)

Denmark. Elkraft 2005a. Demand Response in Practice, Elkraftand Developing Demand Response in the Energy Markets.Demand Management Delivery. Demand Response Workshop. Slide

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-01-01T23:59:59.000Z

125

Open Automated Demand Response Communications in Demand Response for Wholesale Ancillary Services  

E-Print Network (OSTI)

A. Barat, D. Watson. 2006 Demand Response Spinning ReserveKueck, and B. Kirby 2008. Demand Response Spinning ReserveReport 2009. Open Automated Demand Response Communications

Kiliccote, Sila

2010-01-01T23:59:59.000Z

126

ORNL/TM-2005/263 ANCILLARY SERVICES PROVIDED FROM DER  

E-Print Network (OSTI)

to disruption at the very time when they are most needed (i.e., when the system is stressed by natural disasters-efficiency gas turbines, integrated "microgrids" of small generators (sometimes in the form of solar cells-Healing Grid Smart Grid A Vision for the Future- A Network of Integrated Microgrids That Can Monitor and Heal

Tolbert, Leon M.

127

ORNL/TM-2005/263 ANCILLARY SERVICES PROVIDED FROM DER  

E-Print Network (OSTI)

to customers upon loss of power from the grid and under natural disasters, such as hurricanes or earthquakes to equipment failure, natural disasters, or terrorist acts. Current IEEE Standard 1547 [4] requires all of a PDS as a microgrid. Such standards will be of extreme value to maintain availability of power supply

Oak Ridge National Laboratory

128

Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions  

E-Print Network (OSTI)

Demand Response in the Energy Markets. Copenhagen, 27 May.Demand Response in the Energy Markets Fingrid Oyj 2005a.Response in the Energy Markets: Framework and Infrastructure

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-01-01T23:59:59.000Z

129

Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions  

E-Print Network (OSTI)

of the common Nordic electricity trade area is 24 million,trade a series of standardized blocks of electricity (e.g.of Trade and Industry. London, UK. Electricity Act, 2004.

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-01-01T23:59:59.000Z

130

Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions  

E-Print Network (OSTI)

Next Energy 2005. NSW Standby Generators Survey – Summaryproject is a survey of all standby generators in NSW focusedcreating a database on standby generation useful in reducing

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-01-01T23:59:59.000Z

131

Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions  

E-Print Network (OSTI)

to restructure its electricity industry. Under the terms ofmanagement of electricity industry transformation. Loadsto restructure their electricity industries and introduce

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-01-01T23:59:59.000Z

132

Open Automated Demand Response Communications in Demand Response for Wholesale Ancillary Services  

E-Print Network (OSTI)

Day-Ahead Schedule) x Real-Time Price This may result in areal-time dispatch of the CAISO controlled grid. Participating load program relies on a simple price-

Kiliccote, Sila

2010-01-01T23:59:59.000Z

133

Analysis and characterization of ancillary service demand response strategies for variable air volume HVAC systems  

E-Print Network (OSTI)

Output variability and prediction difficulties with respect to solar and wind electricity resources increase the requirement of grid-scale reserve capacity and add strain to existing firm generators used for reserves and ...

Blum, David H. (David Henry)

2013-01-01T23:59:59.000Z

134

Second use of transportation batteries: Maximizing the value of batteries for transportation and grid services  

SciTech Connect

Plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) are expected to gain significant market share over the next decade. The economic viability for such vehicles is contingent upon the availability of cost-effective batteries with high power and energy density. For initial commercial success, government subsidies will be highly instrumental in allowing PHEVs to gain a foothold. However, in the long-term, for electric vehicles to be commercially viable, the economics have to be self-sustaining. Towards the end of battery life in the vehicle, the energy capacity left in the battery is not sufficient to provide the designed range for the vehicle. Typically, the automotive manufacturers indicated the need for battery replacement when the remaining energy capacity reaches 70-80%. There is still sufficient power (kW) and energy capacity (kWh) left in the battery to support various grid ancillary services such as balancing, spinning reserve, load following services. As renewable energy penetration increases, the need for such balancing services is expected to increase. This work explores optimality for the replacement of transportation batteries to be subsequently used for grid services. This analysis maximizes the value of an electric vehicle battery to be used as a transportation battery (in its first life) and then as a resource for providing grid services (in its second life). The results are presented across a range of key parameters, such as depth of discharge (DOD), number of batteries used over the life of the vehicle, battery life in vehicle, battery state of health (SOH) at end of life in vehicle and ancillary services rate. The results provide valuable insights for the automotive industry into maximizing the utility and the value of the vehicle batteries in an effort to either reduce the selling price of EVs and PHEVs or maximize the profitability of the emerging electrification of transportation.

Viswanathan, Vilayanur V.; Kintner-Meyer, Michael CW

2010-09-30T23:59:59.000Z

135

Comparing Maintenance Costs of Geothermal Heat Pump Systems with other HVAC Systems in Lincoln Public Schools: Repair, Service, and Corrective Actions  

DOE Green Energy (OSTI)

The Lincoln Public School District, in Lincoln, Nebraska, recently installed vertical-bore geothermal heat pump systems in four, new, elementary schools. Because the district has consistent maintenance records and procedures, it was possible to study repair, service and corrective maintenance requests for 20 schools in the district. Each school studied provides cooling to over 70% of its total floor area and uses one of the following heating and cooling systems: vertical-bore geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACUGHWB), water-cooled chiller with gas-fired hot water boiler (WCCYGHWB), or water-cooled chiller with gas-fired steam boiler (WCUGSB). Preventative maintenance and capital renewal activities were not included in the available database. GHP schools reported average total costs at 2.13 cents/ft{sup 2}-yr, followed by ACC/GHWB schools at 2.88 cents/ft{sup 2}-yr, WCC/GSB schools at 3.73 cents/ft{sup 2}-yr, and WCC/GHWB schools at 6.07 cents/ft{sup 2}-yr. Because of tax-exemptions on material purchases, a reliance on in-house labor, and the absence of preventative maintenance records in the database, these costs are lower than those reported in previous studies. A strong relationship (R{sup 2}=O.52) was found between costs examined and cooling system age: the newer the cooling equipment, the less it costs to maintain.

Martin, M.A.; Durfee, D.J.; Hughes, P.J.

1999-06-19T23:59:59.000Z

136

Providing Reliability Services through Demand Response: A Prelimnary Evaluation of the Demand Response Capabilities of Alcoa Inc.  

Science Conference Proceedings (OSTI)

Demand response is the largest underutilized reliability resource in North America. Historic demand response programs have focused on reducing overall electricity consumption (increasing efficiency) and shaving peaks but have not typically been used for immediate reliability response. Many of these programs have been successful but demand response remains a limited resource. The Federal Energy Regulatory Commission (FERC) report, 'Assessment of Demand Response and Advanced Metering' (FERC 2006) found that only five percent of customers are on some form of demand response program. Collectively they represent an estimated 37,000 MW of response potential. These programs reduce overall energy consumption, lower green house gas emissions by allowing fossil fuel generators to operate at increased efficiency and reduce stress on the power system during periods of peak loading. As the country continues to restructure energy markets with sophisticated marginal cost models that attempt to minimize total energy costs, the ability of demand response to create meaningful shifts in the supply and demand equations is critical to creating a sustainable and balanced economic response to energy issues. Restructured energy market prices are set by the cost of the next incremental unit of energy, so that as additional generation is brought into the market, the cost for the entire market increases. The benefit of demand response is that it reduces overall demand and shifts the entire market to a lower pricing level. This can be very effective in mitigating price volatility or scarcity pricing as the power system responds to changing demand schedules, loss of large generators, or loss of transmission. As a global producer of alumina, primary aluminum, and fabricated aluminum products, Alcoa Inc., has the capability to provide demand response services through its manufacturing facilities and uniquely through its aluminum smelting facilities. For a typical aluminum smelter, electric power accounts for 30% to 40% of the factory cost of producing primary aluminum. In the continental United States, Alcoa Inc. currently owns and/or operates ten aluminum smelters and many associated fabricating facilities with a combined average load of over 2,600 MW. This presents Alcoa Inc. with a significant opportunity to respond in areas where economic opportunities exist to help mitigate rising energy costs by supplying demand response services into the energy system. This report is organized into seven chapters. The first chapter is the introduction and discusses the intention of this report. The second chapter contains the background. In this chapter, topics include: the motivation for Alcoa to provide demand response; ancillary service definitions; the basics behind aluminum smelting; and a discussion of suggested ancillary services that would be particularly useful for Alcoa to supply. Chapter 3 is concerned with the independent system operator, the Midwest ISO. Here the discussion examines the evolving Midwest ISO market structure including specific definitions, requirements, and necessary components to provide ancillary services. This section is followed by information concerning the Midwest ISO's classifications of demand response parties. Chapter 4 investigates the available opportunities at Alcoa's Warrick facility. Chapter 5 involves an in-depth discussion of the regulation service that Alcoa's Warrick facility can provide and the current interactions with Midwest ISO. Chapter 6 reviews future plans and expectations for Alcoa providing ancillary services into the market. Last, chapter 7, details the conclusion and recommendations of this paper.

Starke, Michael R [ORNL; Kirby, Brendan J [ORNL; Kueck, John D [ORNL; Todd, Duane [Alcoa; Caulfield, Michael [Alcoa; Helms, Brian [Alcoa

2009-02-01T23:59:59.000Z

137

Comparing maintenance costs of geothermal heat pump systems with other HVAC systems in Lincoln public schools: Repair, service, and corrective actions  

SciTech Connect

The Lincoln Public School District, in Lincoln, Nebraska, recently installed vertical-bore geothermal heat pump systems in four new elementary schools. Because the district has consistent maintenance records and procedures, it was possible to study repair, service, and corrective maintenance requests for 20 schools in the district. Each school studied provides cooling to over 70% of its total floor area and uses one of the following heating and cooling systems: vertical-bore geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), water-cooled chiller with gas-fired hot water boiler (WCC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). Preventative maintenance and capital renewal activities were not included in the available database. GHP schools reported average total costs at 2.13{cents}/ft{sup 2}-yr, followed by ACC/GHWB schools at 2.884{cents}/ft{sup 2}-yr, WCC/GSB schools at 3.73{cents}/ft{sup 2}-yr, and WCC/GHWB schools at 6.07{cents}/ft{sup 2}-yr. Because of tax exemptions on material purchases, a reliance on in-house labor, and the absence of preventative maintenance records in the database, these costs are lower than those reported in previous studies. A strong relationship (R{sup 2} = 0.52) was found between costs examined and cooling system age: the newer the cooling equipment, the less it costs to maintain.

Martin, M.A.; Durfee, D.J.; Hughes, P.J.

1999-07-01T23:59:59.000Z

138

FY2001 Annual Progress Report for the Vehicle Propulsion & Ancillary Subsystems Program  

NLE Websites -- All DOE Office Websites (Extended Search)

PROPULSION & PROPULSION & ANCILLARY SUBSYSTEMS 2 0 0 1 A N N UA L P R O G R E S S R E P O R T U.S. Department of Energy Energy Efficiency and Renewable Energy Office of Transportation Technologies A C K N O W L E D G E M E N T We would like to express our sincere appreciation to Argonne National Laboratory and Computer Systems Management, Inc., for their artistic and technical contributions in preparing and publishing this report. In addition, we would like to thank all our program participants for their contributions to the programs and all the authors who prepared the project abstracts that comprise this report. U.S. Department of Energy Office of Advanced Automotive Technologies 1000 Independence Avenue, S.W. Washington, D.C. 20585-0121 FY 2001 Annual Progress Report for the Vehicle Propulsion & Ancillary Subsystems Program

139

Ancillary Equipment  

Science Conference Proceedings (OSTI)

... Load experiment on a Rene N5 TM superalloy single crystal. A Huber phi-table with Chi-arc underneath is used to orient the crystal. Euler Cradle. ...

140

System design specification for the 1/4-scale tank and ancillary equipment  

Science Conference Proceedings (OSTI)

The Fluid Dynamic Test Facility (FDTF) is located in the 336 Building at the 300 Area of the Hanford Site. The FDTF will contain tanks that model the average internal diameter and height of a 3875 m{sup 3} (1-million-gal) double-shell tank at both 1/12- and 1/4-scale, as well as ancillary equipment required to store, mix, and transport waste simulants. Experiments to be conducted in this facility will include investigations of sludge mobilization, slurry uniformity, aerosol generation, sludge washing, and instrumentation development to support start-up of the Hanford Waste Vitrification Project. This facility will also be used to model concepts and mitigating strategies to be used in the resolution of tank safety issues and the retrieval of waste from watch-list tanks.

Bamberger, J.A.; Bates, J.M. [Pacific Northwest Lab., Richland, WA (United States); Waters, E.D.; Heimberger, D.T. [Westinghouse Hanford Co., Richland, WA (United States)

1993-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Energy Efficiency & Renewable Energy eere.energy.gov Program Name or Ancillary Text eere.energy.gov  

E-Print Network (OSTI)

Energy Efficiency & Renewable Energy eere.energy.gov 1 Program Name or Ancillary Text eereAnnualCapacityAdditions(GW) Other non-Renewable Coal Gas (non-CCGT) Gas (CCGT) Other Renewable Wind 43% wind 42% wind 34% wind18% wind 12% wind 2% wind 3% wind 1% wind 4% wind 0% wind 25% wind #12;WIND AND WATER POWER PROGRAM 8 China

142

Cost Sharing for the Economic Lot-Sizing Problem with ...  

E-Print Network (OSTI)

cost and production costs. In addition, in each period, the retailer incurs holding costs for storing serviceable product and returned product in inventory.

143

Using Dimmable Lighting for Regulation Capacity and Non-Spinning Reserves in the Ancillary Services Market. A Feasibility Study.  

E-Print Network (OSTI)

Digital Addressable Lighting Interface Demand ResponseDemand Response Automation Server Energy Information Agency2009). “Open Automated Demand Response Communications in

Rubinstein, Francis

2011-01-01T23:59:59.000Z

144

Using Dimmable Lighting for Regulation Capacity and Non-Spinning Reserves in the Ancillary Services Market. A Feasibility Study.  

E-Print Network (OSTI)

Digital Addressable Lighting Interface Demand Responseof Demand-Responsive Lighting in Offices with and without2010). Using Dimmable Lighting for Regulation Capacity and

Rubinstein, Francis

2011-01-01T23:59:59.000Z

145

Costs in the Norwegian Payment System  

E-Print Network (OSTI)

We calculate social and private cost for the use and production of payment services in Norway for 2007. The calculations include banks’, merchants ’ and households ’ cost for cash, cards and giro payments. The social cost is calculated to be 0.49 % of GDP, or NOK 11.16 billion. Costs are also calculated on a per-service basis. The results are compared with data from earlier cost surveys by Norges Bank. The unit costs of the most popular services have decreased over the years. Efficiency and productivity of banks ’ payment service operations has improved. We also make comparisons between frameworks, methodologies, and results from cost surveys in five European countries.

Olaf Gresvik; Harald Haare; Norges Bank; Sigbjřrn Atle Berg; Gunnvald Grřnvik; Asbjřrn Enge

2009-01-01T23:59:59.000Z

146

Constellation Proposal for an Automated Determination of the RPM Gross Cost of New Entry (CONE)  

E-Print Network (OSTI)

Constellation offers the following outline for reforming the annual development of Gross CONE in an automated fashion. The purpose of the proposal is to derive CONE in a manner that reasonably approximates the contemporaneous cost to build a Reference Resource in the auction year, via rules that are easily understood, reasonably accurate, transparent, and replicable. In summary, our proposal features an initial benchmark gross CONE for the 2012?13 Delivery Year that will be adjusted based on an the Handy Whitman Index prior to subsequent annual Base Residual Auctions. Periodically, the prevailing cost to build the reference resource will be comprehensively studied by a third party expert. If the study varies from the index?adjusted CONE by more than a predetermined amount, then the study value shall be set as the CONE for the next BRA and shall be the new benchmark. The gross CONE would subsequently be adjusted to account for expected energy and ancillary services revenues as currently set forth in the OATT.

unknown authors

2009-01-01T23:59:59.000Z

147

Constellation Proposal for an Automated Determination of the RPM Gross Cost of New Entry (CONE)  

E-Print Network (OSTI)

Constellation offers the following outline for reforming the annual development of Gross CONE in an automated fashion. The purpose of the proposal is to derive CONE in a manner that reasonably approximates the contemporaneous cost to build a Reference Resource in the auction year, via rules that are easily understood, reasonably accurate, transparent, and replicable. In summary, our proposal features an initial benchmark gross CONE for the 2012-13 Delivery Year that will be adjusted based on an the Handy Whitman Index prior to subsequent annual Base Residual Auctions. Periodically, the prevailing cost to build the reference resource will be comprehensively studied by a third party expert. If the study varies from the index-adjusted CONE by more than a predetermined amount, then the study value shall be set as the CONE for the next BRA and shall be the new benchmark. The gross CONE would subsequently be adjusted to account for expected energy and ancillary services revenues as currently set forth in the OATT.

unknown authors

2009-01-01T23:59:59.000Z

148

Effects of ancillary ligands on selectivity of protein labeling with platinum(II) chloro complexes  

SciTech Connect

Potassium (2,6-pyridinedicarboxylato)chloroplatinate(II) was synthesized. The molecular structure of the complex in (n-Bu){sub 4}N(Pt(dipic)Cl){center dot}0.5H{sub 2}O was determined by x-ray crystallography. The (Pt(dipic)Cl){sup {minus}} is essentially planar and contains a Pt(II) atom, a tridentate dipicolinate dianion ligand, and a unidentate Cl{sup {minus}} ligand. The bis(bidentate) complex trans-(Pt(dipic){sub 2}){sup 2{minus}} was also observed by {sup 1}H NMR. A red gel-like substance was observed when the yellow aqueous solution of K(Pt(dipic)Cl) was cooled or concentrated. The K(Pt(dipic)Cl) molecules form stacks in the solid state and gel-like substance but remain monomeric over a wide range of concentrations and temperatures. The reactivity and selectivity of(Pt(dipic)Cl){sup {minus}} toward cytochromes c from horse and tuna were studied. The new transition-metal reagent is specific for methionine residues. Di(2-pyridyl-{beta}-ethyl)sulfidochloroplatinum(II) chloride dihydrate was also synthesized. This complex labels histidine and methionine residues in cytochrome c. The ancillary ligands in these platinum(II) complexes clearly determine the selectivity of protein labeling. 106 refs., 10 figs., 11 tabs.

Zhou, Xia-Ying.

1990-02-01T23:59:59.000Z

149

To the Parents and Guardians of BGSU Camp Participants: On behalf of the staff at the Student Health Service (SHS), I thank you for entrusting the health and health care  

E-Print Network (OSTI)

regardless of their health insurance status. · The SHS offers ancillary services, such as laboratory tests at the Student Health Service (SHS), I thank you for entrusting the health and health care of your dependent, a full-service pharmacy and laboratory. All currently enrolled camp participants are eligible to use our

Moore, Paul A.

150

A comparison of automated land cover/use classification methods for a Texas bottomland hardwood system using lidar, spot-5, and ancillary data  

E-Print Network (OSTI)

Bottomland hardwood forests are highly productive ecosystems which perform many important ecological services. Unfortunately, many bottomland hardwood forests have been degraded or lost. Accurate land cover mapping is crucial for management decisions affecting these disappearing systems. SPOT-5 imagery from 2005 was combined with Light Detection and Ranging (LiDAR) data from 2006 and several ancillary datasets to map a portion of the bottomland hardwood system found in the Sulphur River Basin of Northeast Texas. Pixel-based classification techniques, rulebased classification techniques, and object-based classification techniques were used to distinguish nine land cover types in the area. The rule-based classification (84.41% overall accuracy) outperformed the other classification methods because it more effectively incorporated the LiDAR and ancillary datasets when needed. This output was compared to previous classifications from 1974, 1984, 1991, and 1997 to determine abundance trends in the area’s bottomland hardwood forests. The classifications from 1974-1991 were conducted using identical class definitions and input imagery (Landsat MSS 60m), and the direct comparison demonstrates an overall declining trend in bottomland hardwood abundance. The trend levels off in 1997 when medium resolution imagery was first utilized (Landsat TM 30m) and the 2005 classification also shows an increase in bottomland hardwood from 1997 to 2005, when SPOT-5 10m imagery was used. However, when the classifications are re-sampled to the same resolution (60m), the percent area of bottomland hardwood consistently decreases from 1974-2005. Additional investigation of object-oriented classification proved useful. A major shortcoming of object-based classification is limited justification regarding the selection of segmentation parameters. Often, segmentation parameters are arbitrarily defined using general guidelines or are determined through a large number of parameter combinations. This research justifies the selection of segmentation parameters through a process that utilizes landscape metrics and statistical techniques to determine ideal segmentation parameters. The classification resulting from these parameters outperforms the classification resulting from arbitrary parameters by approximately three to six percent in terms of overall accuracy, demonstrating that landscape metrics can be successfully linked to segmentation parameters in order to create image objects that more closely resemble real-world objects and result in a more accurate final classification.

Vernon, Zachary Isaac

2008-05-01T23:59:59.000Z

151

Federal Energy Management Program: Energy Service Companies  

NLE Websites -- All DOE Office Websites (Extended Search)

Service Companies Energy service companies (ESCOs) develop, install, and fund projects designed to improve energy efficiency and reduce operation and maintenance costs in their...

152

NSLS Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Services NSLS Services Computing Services Lab Space Libraries Postal Services Procurement Repair & Equipment Services Shipping Procedures Storage User Accounts Workshop Procedures...

153

Next generation solutions for the energy services industry  

E-Print Network (OSTI)

to target cost-effective energy efficiency upgrades. •and analyze energy efficiency cost and performance data canEnergy Efficiency Services to Large Commercial Firms: Operat- ing Cost

Kumar, Satish; Kromer, Steve

2006-01-01T23:59:59.000Z

154

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 17, NO. 2, MAY 2002 283 Unbundled Reactive Support Service: Key  

E-Print Network (OSTI)

61801 USA (e-mail: gross@uiuc.edu). S. Tao is with ABB Energy Information Systems, Santa Clara, CA USA their implications in acquiring VAr support as one of the ancillary services. The paper provides an analysis markets by providing reactive support instead of real power. We illustrate the combined effects

Gross, George

155

SERVICES Purpose  

E-Print Network (OSTI)

This Management Memo calls on all state agencies operating state motor vehicles to make every effort to “Flex Your Power at the Pump, ” and lower fuel costs for the State of California through vigorous compliance with the preventative maintenance standards identified in this management memo and in the Automobile Record, Standard (STD.) 271. Background Public Resources Code 25722 mandates the state reduce petroleum consumption of its vehicle fleet to the maximum extent practicable including improved preventative maintenance. State Administrative Manual Section (SAM) 4101 establishes the need to comply with minimum preventative maintenance standards listed in the Automobile Maintenance Record, STD. 271. This includes prescribed services and mechanical inspections that promote state vehicle efficiency and achieve optimum fuel mileage. SAM Section 3687.1 prohibits the purchase of premium grade gasoline for state vehicles. And, directs state drivers to make fuel purchases at lower priced self-service pumps whenever possible.

Manual Sections

2005-01-01T23:59:59.000Z

156

MOTOR-VEHICLE INFRASTRUCTURE AND SERVICES PROVIDED BY THE PUBLIC SECTOR Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

based on the cost estimates for private parking, in Report #and institutional parking The cost estimates for 1991 area complete social-cost estimate would include, in addition,

Delucchi, Mark

2005-01-01T23:59:59.000Z

157

Motor-Vehicle Infrastructure and Services Provided by the Public Sector: Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

based on the cost estimates for private parking, in Report #and institutional parking The cost estimates for 1991 area complete social-cost estimate would include, in addition,

Delucchi, Mark; Murphy, James

2005-01-01T23:59:59.000Z

158

NSLS Services | Postal Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Postal Services Postal Services U.S. Postal Service BNL has a full-service U.S. Postal Service Office (Upton branch) located in Staff Services, Building 179, x2539. BNL Mail Service Mail is delivered and picked up twice a day from each building on site. Users should leave internal lab mail (brown envelopes, no stamps needed) and U.S. Mail (regular envelopes, stamps required) in the outgoing mail boxes at NSLS mail stop 725A, located in the lobby by the elevator. Receiving Mail During regular working hours, packages and other special deliveries are brought to the Stockroom while regular mail is taken to the mailstops around the building. Each beam port is assigned a mail slot at NSLS mail stop 725A near the elevator in the lobby. The beamline number should be on all mail addressed to users. Mail to users should be addressed as follows

159

MOTOR-VEHICLE INFRASTRUCTURE AND SERVICES PROVIDED BY THE PUBLIC SECTOR Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

OIL - HOLDING COSTS .AND MANAGEMENT, AND OIL-HOLDING COSTS 7.12.1 Background TheO & M costs, and oil–holding costs -- can be estimated from

Delucchi, Mark

2005-01-01T23:59:59.000Z

160

Motor-Vehicle Infrastructure and Services Provided by the Public Sector: Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

OIL - HOLDING COSTS .AND MANAGEMENT, AND OIL-HOLDING COSTS 7.12.1 Background TheO & M costs, and oil–holding costs -- can be estimated from

Delucchi, Mark; Murphy, James

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Services | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Services Services Waste Management EM is dedicated to safely disposing of waste and seeks cost effective and environmentally responsible project execution methods. Read more Site & Facility Restoration EM provides integration, planning and analysis for all soil and groundwater remediation, deactivation and decommissioning (D&D) and facility engineering. This work includes sustainability projects to ensure that these activities are completed efficiently and effectively, reducing significant risks and life-cycle schedules and costs in the D&D program. Read more Program Management EM provides program management support with the goal of continuously improving performance. Read more Communication & Engagement EM provides clear, timely, and consistent communication on the mission and

162

Appendix E-1 Ancillary StudiesE-1.1 Appendix E-1  

E-Print Network (OSTI)

Technologies re-formats the EPA data, categorizing it by manufacturer as well as by class of vehicle. Fuel-keeping, and accounting; and · overhead costs such as office space and equipment, vehicles, and legal fees with the public and other stakeholders, including manufacturers. Evaluations have been conducted of minimum

163

Cost-sharing mechanisms for scheduling under general demand ...  

E-Print Network (OSTI)

In a general demand cost-sharing game, there is a set of customers who is ... Based on these bids and the cost of providing service, the service provider.

164

Multiservice platforms for data services  

Science Conference Proceedings (OSTI)

The potential for broadband and data services is large and continues to expand for the foreseeable future. Consideration of the cost-effective delivery and support of both new, advanced services, as well as existing services, has led to the driver for ...

D. J. Lewis; O. N. Wheeler; M. J. Warner; D. Newey; S. Lalwani

1998-01-01T23:59:59.000Z

165

Low-Cost Solutions for Dynamic Window Material  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Low-cost Solutions For Dynamic Low-cost Solutions For Dynamic Window Materials André Anders Lawrence Berkeley National Laboratory aanders@lbl.gov 510-486-6745 April 4, 2013 AZO: transparent and conducting 2 | Program Name or Ancillary Text eere.energy.gov BTO Program Peer Review Low-cost Solutions For Dynamic Window Materials André Anders Lawrence Berkeley National Laboratory aanders@lbl.gov 510-486-6745 April 4, 2013 Task 1: Reduce cost of transparent conducting oxide (TCO) for electrochromic windows, * started in FY11 * Applicable to existing technology of electrochromic window and other applications Task 2: Produce films of oxide nanocrystals relevant to dynamic windows by terminated cluster growth, * started in FY 13

166

Low-Cost Solutions for Dynamic Window Material  

NLE Websites -- All DOE Office Websites (Extended Search)

Low-cost Solutions For Dynamic Low-cost Solutions For Dynamic Window Materials André Anders Lawrence Berkeley National Laboratory aanders@lbl.gov 510-486-6745 April 4, 2013 AZO: transparent and conducting 2 | Program Name or Ancillary Text eere.energy.gov BTO Program Peer Review Low-cost Solutions For Dynamic Window Materials André Anders Lawrence Berkeley National Laboratory aanders@lbl.gov 510-486-6745 April 4, 2013 Task 1: Reduce cost of transparent conducting oxide (TCO) for electrochromic windows, * started in FY11 * Applicable to existing technology of electrochromic window and other applications Task 2: Produce films of oxide nanocrystals relevant to dynamic windows by terminated cluster growth, * started in FY 13

167

cost | OpenEI  

Open Energy Info (EERE)

cost cost Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

168

Changes in the Economic Value of Variable Generation at High Penetration Levels: A Pilot Case Study of California  

E-Print Network (OSTI)

prices for energy and ancillary services. The day-aheadprices for energy and ancillary services using the shadowhourly prices for energy and ancillary services that reflect

Mills, Andrew

2013-01-01T23:59:59.000Z

169

Facilities & Administrative (F&A) Costs at NIU F&A costs at NIU  

E-Print Network (OSTI)

project, instructional or public service activity. Such costs include utilities, buildings and facilities accrue only as projects dollars are expended. As a result, F&A costs are collected and allocatedFacilities & Administrative (F&A) Costs at NIU #12;F&A costs at NIU What are Facilities

Karonis, Nicholas T.

170

Valuing the Flexibility of Providing System Services for Coal Plants with Carbon Capture Capability  

Science Conference Proceedings (OSTI)

This technical update describes a preliminary study of the potential value associated with using the operating flexibility available from advanced coal plant designs with carbon capture and storage (CCS) systems, as well as from existing coal plants with CCS retrofits, to participate in ancillary service markets. New analytical approaches are introduced that offer the ability to examine plant outputs and operating modes in the context of varying power market conditions151for real power and for reserve a...

2010-12-31T23:59:59.000Z

171

Services | Central Fabrication Services | Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Services & Capabilities Services & Capabilities The Central Fabrication Services Division's capabilities range from an Electric Discharge Machining (EDM) capability, to a state of the art cleaning facility, to a large fabricating facility which includes CNC Machining, Automatic Tube Welding, CNC Punch Press capability, and 3-D printing. CNC Auto Feed Saw High Bay Area 3-D Printer Main Shop, Building 479 Maintenance Sheet Metal Area Water Jet Machine X-ray Generating Tube CR X-ray Processor with High Resolution Monitor Low Bay Area in Machine Shop Wire EDM Machine Wire EDM Machine Oil Recycling Facility, Building 495 UHV Cleaning Facility, Building 498 Material Storage and Stock Central Fabrication Services is proud of it's highly proficient technical staff all of which are available, at no cost to the customer, for

172

NSLS Services | Repair & Equipment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Repair & Equipment Services Repair & Equipment Services Cleaning Facility (BNL Central Shops) Solvent cleaning of vacuum parts and leak checking service is also available. Work is billed to each user via a BNL ILR. Contact the NSLS Building Manager to arrange for any of these services. Electronics Repair Limited repairs for electronic equipment are available from an outside contractor through the Control Room. Contact Control Room Supervisor Randy Church (x2550 or x2736, pager 5310). Shipping memos are filled out on the web, and pick ups are on Fridays. Come to the Control Room for assistance. The user should call the contractor on the day before scheduled pickups to alert the contractor of the pickup. Items to be repaired should be left in the Control Room with the completed shipping memo. Costs are charged to the

173

Electricity Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Emissions Caps and the Impact of a Radical Change in Nuclear Electricity Costs journal International Journal of Energy Economics and Policy volume year month chapter...

174

Transportation Services | Staff Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation Services Transportation Services The BNL Transportation Office, located at 20 Brookhaven Avenue, Building 400A, is available to assist BNL employees, guests and visitors with transportation needs in support of Laboratory programs. The hours of operation are 8:30 AM - 5:00 PM Monday through Friday. To contact the Transportation Office call (631) 344-2535. Stony Brook Parking Passes The Transportation Office has a limited number of parking passes for the three (3) parking garages at Stony Brook University. The passes are available to and are intended for use by BNL employees/scientific staff on official business only. Passes may be used at the Administration, University Hospital and Health Services Center garages on the Stony Brook campus when visiting SBU on official business.

175

Electricity Prices in a Competitive Environment: Marginal Cost Pricing  

Reports and Publications (EIA)

Presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated cost-of-service pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity of electricity suppliers?

Information Center

1997-08-01T23:59:59.000Z

176

Parametric Study of Front-End Nuclear Fuel Cycle Costs  

Science Conference Proceedings (OSTI)

This study provides an overview of front-end fuel cost components for nuclear plants, specifically uranium concentrates, uranium conversion services, uranium enrichment services, and nuclear fuel fabrication services. A parametric analysis of light-water reactor (LWR) fuel cycle costs is also included in order to quantify the impacts that result from changes in the cost of one or more front-end components on overall fuel cycle costs.

2009-02-20T23:59:59.000Z

177

Elastic service availability: utility framework and optimal provisioning  

Science Conference Proceedings (OSTI)

Service availability is one of the most closely scrutinized metrics in offering network services. It is important to cost- effectively provision a managed and differentiated network with various service availability guarantees under a unified platform. ...

Dahai Xu; Ying Li; Mung Chiang; A. Calderbank

2008-08-01T23:59:59.000Z

178

Well servicing rig market report  

Science Conference Proceedings (OSTI)

This article profiles the well servicing industry, focusing on the problems facing the industry under currently depressed market conditions. The problems of rising operating costs, oil price uncertainty, and aging equipment are addressed specifically.

Killalea, M

1989-01-01T23:59:59.000Z

179

Recruitment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

IAEA Recruitment Services Personal History Form (PHF) and Job Opportunities IAEA Employment Benefits Relevant Publications and Brochures Interview Process This service is provided...

180

Motor-Vehicle Infrastructure and Services Provided by the Public Sector: Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

Blincoe, The Economic Cost of Motor Vehicle Crashes, 1994,M. Faigin, The Economic Cost of Motor Vehicle Crashes, 1990,Q. Wang, and D. L. Greene, Motor Vehicle Fuel Economy, The

Delucchi, Mark; Murphy, James

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

MOTOR-VEHICLE INFRASTRUCTURE AND SERVICES PROVIDED BY THE PUBLIC SECTOR Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

Blincoe, The Economic Cost of Motor Vehicle Crashes, 1994,M. Faigin, The Economic Cost of Motor Vehicle Crashes, 1990,Q. Wang, and D. L. Greene, Motor Vehicle Fuel Economy, The

Delucchi, Mark

2005-01-01T23:59:59.000Z

182

Copy Service, Production Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Copy Service Copy Service Copying in color or black-and-white from hard copy or electronic files. Paper size up to 13" x 19" in a variety of stocks and colors. Larger Documents (up to 36" wide and 100" long) can be reproduced in Black & White from prints or files and can be saved in a variety of electronic format Variable Data Printing - personalized document production Tab Printing Forms CD/DVD Duplication CD/DVD direct printing Binding Collate documents, insert tab dividers, punch holes for binding Stapling documents up to 1 inch thick Spiral, adhesive and perfect binding. Hard covers also available upon request Folding & Mailing Print and apply mailing addresses and labels Machine fold documents and insert into envelopes for mailing Laminate printed items up to 35" wide.

183

Service Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Service Service Characteristics by Activity... Service Service buildings are those in which some type of service is provided, other than food service or retail sales of goods. Basic Characteristics [ See also: Equipment | Activity Subcategories | Energy Use ] Service Buildings... Most service buildings were small, with almost ninety percent between 1,001 and 10,000 square feet. Tables: Buildings and Size Data by Basic Characteristics Establishment, Employment, and Age Data by Characteristics Number of Service Buildings by Predominant Building Size Category Figure showing number of service buildings by size. If you need assistance viewing this page, please contact 202-586-8800. Equipment Table: Buildings, Size, and Age Data by Equipment Types Predominant Heating Equipment Types in Service Buildings

184

Copy Services | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Copy Services Copy Services Copy Services The Copier Management Team is here to make sure your copier needs are met. Our products and services include: Acquisition of New and Replacement Copiers Copier Maintenance/Repairs Copier Relocation Monthly Working Capital Fund Billing Reports Copier supplies Other services include needs assessment analysis to determine workload and most appropriate equipment to: Perform acquisition activities on behalf of program customers. Negotiation of equipment trade-in allowance where applicable. Arrange for delivery and installation of newly purchased equipment. Coordinate training for key operators and users on newly acquired equipment. Establish annual maintenance agreements with vendors (including negotiation of most cost-effective terms and conditions).

185

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining the equipment for reclamation? Types of Costs #12;· Marginal Cost: ­ Change in total cost ­ Any production process involves fixed and variable costs. As production increases/expands, fixed costs are unchanged, so

Boisvert, Jeff

186

The Demand Component of Electric Service: Linkages to Service Reliability and Need for Transparency  

Science Conference Proceedings (OSTI)

This white paper distinguishes the demand component of electric service (measured in kilowatts)distinct from the energy component (measured in kilowatthours)and emphasizes the need for power demand cost transparency. Customers' experience with electric service reliability is described in terms of continuity of electric service, availability of service, and restoration time after service interruption. The paper discusses the connection between power demand and electric service reliability, as experienced ...

2012-08-03T23:59:59.000Z

187

Security Event and Log Management Service  

E-Print Network (OSTI)

Security Event and Log Management Service: Comprehensive, Cost-effective Approach to Enhance Network Security and Security Data Management IBM Global Technology Services December 2007 #12;Executive Summary The economics of network security have changed. The high cost and complexity inherent in the use

188

MOTOR-VEHICLE INFRASTRUCTURE AND SERVICES PROVIDED BY THE PUBLIC SECTOR Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

ACF = B + AF (short-run cost) ACF 91 (1.0) ACF 0 ACF ˛ACM ˛ACM ACF = AF k (long-run cost) B ˛AM AF ˛AM AF 0 AF 91 (1.0)is simply: DRAFT FOR REVIEW ACF = AF k ACF ? AF ? where: ACF

Delucchi, Mark

2005-01-01T23:59:59.000Z

189

Motor-Vehicle Infrastructure and Services Provided by the Public Sector: Report #7 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

ACF = B + AF (short-run cost) ACF 91 (1.0) ACF 0 ACF ˛ACM ˛ACM ACF = AF k (long-run cost) B ˛AM AF ˛AM AF 0 AF 91 (1.0)is simply: DRAFT FOR REVIEW ACF = AF k ACF ? AF ? where: ACF

Delucchi, Mark; Murphy, James

2005-01-01T23:59:59.000Z

190

Mailing Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Mailing Services Mailing Services Use the form below to add your name to the Depleted UF6 Mailing List. First Name: Last Name: Organization: Address: City: State: Postal Code:...

191

Calibration Services  

Science Conference Proceedings (OSTI)

... of these applications, the Optoelectronics Division provides measurement services at laser power levels from nanowatts to kilowatts and pulse ...

2012-11-28T23:59:59.000Z

192

California Power Markets Implications for Regional Trading & Planningp cat o s o eg o a ad g & a g  

E-Print Network (OSTI)

consistent generation profile coincident with peak load #12;Ancillary Service Costs · Overall cost Wind generation is highly variable 25% of Load Supplied from Renewables 3 Solar follows a more

193

Definition: Remote Service Switch | Open Energy Information  

Open Energy Info (EERE)

Service Switch Service Switch Jump to: navigation, search Dictionary.png Remote Service Switch A power switch within a smart meter that allows a utility to turn electrical service to a residential customer premise on or off. The switch is remotely operated from the utility using the AMI communications infrastructure. This feature is limited to residential meters providing 200 amp service or less, and allows a utility to quickly switch service without having to roll a service truck. This can be particularly useful for reducing service time and associated costs for establishing or terminating services for move-ins/move-outs, or for switching off service for safety reasons.[1] Related Terms advanced metering infrastructure References ↑ https://www.smartgrid.gov/category/technology/remote_service_switch

194

Biometric Web Services  

Science Conference Proceedings (OSTI)

Biometric Web Services. The biometric web services project combines biometrics and web services to. ... What are Web services? ...

2012-08-15T23:59:59.000Z

195

Production Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Welcome Welcome The Production Services site contains links to each of the division's groups with descriptions of their services. Our goal is to update this website frequently to reflect ongoing service upgrades which, by planning and design, are added so that we can continue to meet your needs in a constantly changing work environment. Note: The Graphic Design Studio has been relocated to the second floor in the north wing of the Research Support Building 400. The telephone number remains the same, X7288. If you have any questions, please call supervisor, Rick Backofen, X6183. Photography Photography services are available at no charge to BNL and Guest users. See a list of the complete range of photography services available. Video Video services are available at no charge to BNL and Guest users. See a list of the complete range of video services available.

196

SUSTAINING PITTSBURGH'S VITAL SERVICES WHEN THE  

E-Print Network (OSTI)

in 50-100 years Weather, terrorism Assumptions and methodology of the cost benefit analyses of services a power outage. The capital costs of such expansion are high. One of the benefits from such backup as once in eighty years in order for the public benefit to outweigh the cost. Policy makers, along

Hines, Paul

197

Vehicle Ancillary Load Reduction Project Close-Out Report: An Overview of the Task and a Compilation of the Research Results  

DOE Green Energy (OSTI)

The amount of fuel used for climate control in U.S. vehicles reduces the fuel economy of more than 200 million light-duty conventional vehicles and thus affects U.S. energy security. Researchers at the DOE National Renewable Energy Laboratory estimated that the United States consumes about 7 billion gallons of fuel per year for air-conditioning (A/C) light-duty vehicles. Using a variety of tools, NREL researchers developed innovative techniques and technologies to reduce the amount of fuel needed for these vehicles' ancillary loads. For example, they found that the A/C cooling capacity of 5.7 kW in a Cadillac STS could be reduced by 30% while maintaining a cooldown performance of 30 minutes. A simulation showed that reducing the A/C load by 30% decreased A/C fuel consumption by 26%. Other simulations supported the great potential for improving fuel economy by using new technologies and techniques developed to reduce ancillary loads.

Rugh, J.; Farrington, R.

2008-01-01T23:59:59.000Z

198

Translation Services  

Science Conference Proceedings (OSTI)

... As a courtesy, the National Center for Standards ... companies may be located by entering the term ... translation services" in any Internet search engine. ...

199

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408) costs apply to those items that are consumed in production process and are roughly proportional to level in cash flow analysis and in the decision to use the equipment for reclamation? Types of Costs #12

Boisvert, Jeff

200

Service Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidelines for Obtaining Guidelines for Obtaining Best-Practice Contracts for Commercial Buildings Operation and Maintenance Service Contracts Prepared with funding from the U.S. EPA December 1997 PECI Acknowledgements Special thanks to the following people for their ongoing contributions and careful review of the document: Byron Courts, Director of Engineering Services, and Dave Rabon, Chief Engineer, Melvin Mark Pete Degan, Director of Customer Marketing, Landis/Staefa David Fanning, HVAC Coordinator, EXPRESS Bil Pletz, Facility Manager, Intel Mike Sanislow, Service Channel Development Leader, Honeywell Home and Building Karl Stum, Director of Technical Services, PECI Tom Walton, President, United Service Alliance For additional copies of this guidebook, contact: Portland Energy Conservation Inc. (PECI)

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

A study in product-service systems strategies  

E-Print Network (OSTI)

What are examples of successful companies innovating in services to create Product- Service Systems that can command a price that exceeds the cost of capital and enhance, protect, or replace the core products? After a brief ...

Moran, Mark D

2011-01-01T23:59:59.000Z

202

SUPPORT ADMINISTRATIVE SERVICES FOR THE NATIONAL ENERGY TECHNOLOGY  

NLE Websites -- All DOE Office Websites (Extended Search)

SUPPORT ADMINISTRATIVE SERVICES FOR THE NATIONAL ENERGY TECHNOLOGY LABORATORY TABLE OF CONTENTS SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS ........................................................................ 8 B.1 SERVICES BEING ACQUIRED - SUPPORT ADMINISTRATIVE SERVICES ................................. 8 B.2 GUARANTEED MINIMUM CONTRACT VALUE - MAXIMUM AVAILABLE PERFORMANCE AWARD FEE ........................................................................................................................................................... 8 B.3 CEILING PRICE OF CONTRACT ............................................................................................................ 8 B.4 ESTIMATED LEVEL OF EFFORT ........................................................................................................... 8

203

An empirical analysis of online game service satisfaction and loyalty  

Science Conference Proceedings (OSTI)

In this study, we argue that there will have some factors affecting online game service satisfaction and loyalty. The purpose of this study is to understand an online game service model. This model contains several dimensions including experiential value, ... Keywords: Experiential value, Loyalty, Online game service, Satisfaction, Service quality, Transaction cost

Hao-Erl Yang; Chi-Chuan Wu; Kuang-Cheng Wang

2009-03-01T23:59:59.000Z

204

Citizens and Service Channels: Channel Choice and Channel Management Implications  

Science Conference Proceedings (OSTI)

The arrival of electronic channels in the 1990s has had a huge impact on governmental service delivery. The new channels have led to many new opportunities to improve public service delivery, not only in terms of citizen satisfaction, but also in cost ... Keywords: Channel Behavior, Channel Choice, Channel Usage, Multi-Channel Management, Public Service Delivery, Service Channels, e-Government

Willem Pieterson

2010-04-01T23:59:59.000Z

205

Utility Service Renovations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Service Renovations Utility Service Renovations Utility Service Renovations October 16, 2013 - 4:59pm Addthis Renewable Energy Options for Utility Service Renovations Photovoltaics Wind Any upgrade to utility service provides an opportunity to revisit a Federal building's electrical loads and costs, but it also may provide an economic way to bundle the upgrade with an onsite renewable electricity project during renovation. Upgrading utility service to the site may involve improving or adding a transformer, upgrading utility meters, or otherwise modifying the interconnection equipment or services with the utility. In some cases, the upgrade may change the tariff structure for the facility and may qualify the property for a different structure with lower overall costs. In all cases, the implementation of renewable energy technologies

206

PAFC Cost Challenges  

NLE Websites -- All DOE Office Websites (Extended Search)

PAFC Cost Challenges Sridhar Kanuri Manager, PAFC Technology *Sridhar.Kanuri@utcpower.com 2 AGENDA Purecell 400 cost challenge Cost reduction opportunities Summary 3 PURECELL ...

207

Outsourcing: Pressure on Suppliers to Expand Services and Lower ...  

Science Conference Proceedings (OSTI)

As the trend for original-equipment manufacturers (OEMs) is to outsource as many ... The demand for expanded (and lower cost) service from suppliers is ... cut lost-time accidents, speed throughput and deliveries, save on energy costs, and so ...

208

Developing an energy efficiency service industry in Shanghai  

E-Print Network (OSTI)

management/services companies (EMC/ESCOs). In particular,activities for most companies; 2) energy cost is only ato business owners; 3) many companies lack technical and

Lin, Jiang; Goldman, Charles; Levine, Mark; Hopper, Nicole

2004-01-01T23:59:59.000Z

209

Novell Services  

NLE Websites -- All DOE Office Websites (Extended Search)

CIS Department CIS Department Novell Services If you don't see the answer to your question here, contact the help desk at 486-HELP or submit a Help Request. Novell Netware is the labs main method of providing file and print services for the PC and Macintosh platforms. Novell end user services are free and include a backed up home directory and access to all distributed printers at LBL. Request a Novell account Request a new Novell printer Request a Novell file restore (choose PC for platform and Backups/Restores for problem) Novell iPrint Accessing Novell File Services Download the LBL Netware client Novell Server Information Novell Departmental Administrative Contacts Novell FAQ: How do I login to the Novell network? 9x | NT4/2000/XP Do I have the Netware client installed? 9x | NT4/2000/XP

210

Minimum Changeover Cost Arborescence  

E-Print Network (OSTI)

having minimum changeover cost, a cost that we now describe. ... We define the changeover cost at j, denoted by d(j), as the sum of the costs at j paid for each of  ...

211

WHO PAYS FOR WHAT? Facilities & Auxiliary Services  

E-Print Network (OSTI)

by everyone; and can be reasonably allocated on a per square foot basis. Most regular maintenance services scenarios, charges for paint and carpet will be at the cost of the requesting unit. 5 #12;FURNITURE REPAIRS

Cakoni, Fioralba

212

Multi-Area Power System Reliability and Production Costing  

Science Conference Proceedings (OSTI)

Multi-area power system operation can reduce costs without jeopardizing service reliability, but the interconnection of systems requires new means for estimating costs and reliability. This report describes methods for evaluating production costs and power system reliability in multi-area power systems.

1990-08-28T23:59:59.000Z

213

Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services (Presentation)  

DOE Green Energy (OSTI)

Battery electric vehicles (BEVs) could significantly reduce the nation's gasoline consumption and greenhouse gas emissions rates. However, both the upfront cost and the limited range of the vehicle are perceived to be deterrents to the widespread adoption of BEVs. A service provider approach to marketing BEVs, coupled with a battery swapping infrastructure deployment could address both issues and accelerate BEV adoption. This presentation examines customer selection, service usage statistics, service plan fees and driver economics. Our results show it is unlikely that a battery swapping service plan will be more cost-effective than ownership of a conventional vehicle. A battery swapping service plan may be a more cost-effective solution than a directly owned BEV for some single-vehicle, high-mileage consumers. However, other factors not considered in this analysis could decrease the viability of such a service.

Neubauer, J.; Pesaran, A.

2013-05-01T23:59:59.000Z

214

Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services (Presentation)  

SciTech Connect

Battery electric vehicles (BEVs) could significantly reduce the nation's gasoline consumption and greenhouse gas emissions rates. However, both the upfront cost and the limited range of the vehicle are perceived to be deterrents to the widespread adoption of BEVs. A service provider approach to marketing BEVs, coupled with a battery swapping infrastructure deployment could address both issues and accelerate BEV adoption. This presentation examines customer selection, service usage statistics, service plan fees and driver economics. Our results show it is unlikely that a battery swapping service plan will be more cost-effective than ownership of a conventional vehicle. A battery swapping service plan may be a more cost-effective solution than a directly owned BEV for some single-vehicle, high-mileage consumers. However, other factors not considered in this analysis could decrease the viability of such a service.

Neubauer, J.; Pesaran, A.

2013-05-01T23:59:59.000Z

215

Utility Data Collection Service  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Collection Service Data Collection Service Federal-Utility Partnership Working Group 4 May 2006 Paul Kelley, Chief of Operations, 78 th CES, Robins AFB David Dykes, Industrial Segment Mgr, Federal, GPC Topics  Background  Commodities Metered  Data Collection  Cost  Results Background  Robins AFB (RAFB) needed to:  Control electricity usage and considered Demand Control  Track and bill base tenants for energy usage  Metering Project Originated in 1993  $$ requirements limited interest  Developed criteria for available $$  Energy Policy Act 2005:  All facilities sub-metered by 2012  $$ no longer restricts metering project Metering Criteria prior to EPACT 2005  All New Construction - (per Air Force Instructions)

216

User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts for Users Contacts for Users User Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment Coordination Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users Tel: 510-486-7727 ALS User Office The User Office is located on the mezzanine of Building 6 (the ALS), Room 2212. Contact Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 Fax: 510-486-4773 Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Hours User Office: Monday-Friday 8.00 a.m. - 12.00 p.m. and 1.00 p.m. - 5.00 p.m.

217

User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Contact Home Contact User Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment Coordination Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users Tel: 510-486-7727 ALS User Office The User Office is located on the mezzanine of Building 6 (the ALS), Room 2212. Contact Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 Fax: 510-486-4773 Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Hours User Office: Monday-Friday 8.00 a.m. - 12.00 p.m. and 1.00 p.m. - 5.00 p.m.

218

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

the Full Social Costs and Benefits of Transportation, ed. bythe Full Social Costs and Benefits of Transportation, ed. bytransportation infrastructure and services, then we should set prices on the infrastructure and services equal to marginal social costs.

Delucchi, Mark

2005-01-01T23:59:59.000Z

219

Actinide partitioning-transmutation program. V. Preconceptual designs and costs of partitioning facilities and shipping casks, Appendix 4. Final report  

SciTech Connect

This Appendix contains cost estimate documents for the Fuels Fabrication Plant Waste Treatment Facility. Plant costs are summarized by Code of Accounts and by Process Function. Costs contributing to each account are detailed. Process equipment costs are detailed for each Waste Treatment Process. Service utility costs are also summarized and detailed. Shipping cask costs are provided.

Not Available

1980-06-01T23:59:59.000Z

220

User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Services Print Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment Coordination Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users Tel: 510-486-7727 ALS User Office The User Office is located on the mezzanine of Building 6 (the ALS), Room 2212. Contact Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 Fax: 510-486-4773 Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Hours User Office: Monday-Friday 8.00 a.m. - 12.00 p.m. and 1.00 p.m. - 5.00 p.m. New user registration: Monday-Friday 8.00 a.m. - 12.00 p.m. and

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

User Services Print User Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment Coordination Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users Tel: 510-486-7727 ALS User Office The User Office is located on the mezzanine of Building 6 (the ALS), Room 2212. Contact Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 Fax: 510-486-4773 Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Hours User Office: Monday-Friday 8.00 a.m. - 12.00 p.m. and 1.00 p.m. - 5.00 p.m. New user registration: Monday-Friday 8.00 a.m. - 12.00 p.m. and

222

User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

User Services Print User Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment Coordination Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users Tel: 510-486-7727 ALS User Office The User Office is located on the mezzanine of Building 6 (the ALS), Room 2212. Contact Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 Fax: 510-486-4773 Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Hours User Office: Monday-Friday 8.00 a.m. - 12.00 p.m. and 1.00 p.m. - 5.00 p.m. New user registration: Monday-Friday 8.00 a.m. - 12.00 p.m. and

223

User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

User Services Print User Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment Coordination Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users Tel: 510-486-7727 ALS User Office The User Office is located on the mezzanine of Building 6 (the ALS), Room 2212. Contact Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 Fax: 510-486-4773 Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Hours User Office: Monday-Friday 8.00 a.m. - 12.00 p.m. and 1.00 p.m. - 5.00 p.m. New user registration: Monday-Friday 8.00 a.m. - 12.00 p.m. and

224

User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

User Services Print User Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment Coordination Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users Tel: 510-486-7727 ALS User Office The User Office is located on the mezzanine of Building 6 (the ALS), Room 2212. Contact Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 Fax: 510-486-4773 Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Hours User Office: Monday-Friday 8.00 a.m. - 12.00 p.m. and 1.00 p.m. - 5.00 p.m. New user registration: Monday-Friday 8.00 a.m. - 12.00 p.m. and

225

User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Services Print Services Print The User Services Group is available to aid ALS users before they arrive, while they are here, and after they leave. User Office Experiment Coordination Section Sue Bailey This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Services Group Leader Prospective users Proprietary users Tel: 510-486-7727 ALS User Office The User Office is located on the mezzanine of Building 6 (the ALS), Room 2212. Contact Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Tel: 510-486-7745 Fax: 510-486-4773 Address: Advanced Light Source, Berkeley Lab, MS 6-2100, Berkeley, CA 94720 Hours User Office: Monday-Friday 8.00 a.m. - 12.00 p.m. and 1.00 p.m. - 5.00 p.m. New user registration: Monday-Friday 8.00 a.m. - 12.00 p.m. and

226

Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services  

DOE Green Energy (OSTI)

Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratory has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.

Neubauer, J. S.; Pesaran, A.

2013-01-01T23:59:59.000Z

227

Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services: Preprint  

DOE Green Energy (OSTI)

Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratory has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.

Neubauer, J.; Pesaran, A.

2013-03-01T23:59:59.000Z

228

UNDP-Energy Costing Tool | Open Energy Information  

Open Energy Info (EERE)

UNDP-Energy Costing Tool UNDP-Energy Costing Tool (Redirected from UNDP Energy Costing Tool) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNDP Energy Costing Tool Agency/Company /Organization: United Nations Development Programme Sector: Energy Topics: Pathways analysis, Resource assessment Resource Type: Software/modeling tools User Interface: Spreadsheet Website: www.undp.org/energy/mdg-serv.htm Cost: Free Equivalent URI: cleanenergysolutions.org/content/energy-costing-tool Language: English References: UNDP MDG Support Services [1] The Energy Costing Tool is an Excel-based model designed to help countries estimate the costs of increasing access to energy services to support the achievement of the UN Millennium Development Goals (MGD). More information is available on the

229

Changes in the Economic Value of Variable Generation at High Penetration Levels: A Pilot Case Study of California  

E-Print Network (OSTI)

be reflected in energy market prices because the costs areVG. The DA market prices for energy and ancillary services (of the year the market price for energy is based on the

Mills, Andrew

2013-01-01T23:59:59.000Z

230

Optical dynamic circuit services  

Science Conference Proceedings (OSTI)

IP service, leased-line service and POTS service have been the three long-standing communication service offerings of providers. Recently, both commercial and research-andeducation network providers have started offering optical dynamic circuit services. ...

Malathi Veeraraghavan; Mark Karol; George Clapp

2010-11-01T23:59:59.000Z

231

Why Mobile Wireless Carriers Share Networks and Services Provisioning  

Science Conference Proceedings (OSTI)

This paper provides a theory that empirically examines why mobile wireless carriers share the costs of building networks and provisioning wireless services. Of the cost drivers of network operators, the most influential on the industry's dynamics are ... Keywords: Active and Passive Infrastructure, Backhaul, Coverage, Network Sharing, Next-Generation Networks, Spectrum, Wireless Services Provisioning

Hemant K. Sabat

2010-07-01T23:59:59.000Z

232

Cost Study Manual  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2012 28, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a percent of payroll exceeds the comparator group by more than five percent. For example, if per capita benefit costs for the comparator group are $10,000 and the benefit costs as a percent of payroll for the comparator group are 20%, the threshold for the contractor's benefits as a

233

Liquefaction and Pipeline Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

factors add 20 percent to liquefaction plant total installed cost 6 Distribution Pipeline Costs Collected historical Oil & Gas Journal data, and surveyed for current urban and...

234

Highly Insulating Windows - Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost Cost The following is an estimate of the cost effective incremental cost of highly-insulating windows (U-factor=0.20 Btu/hr-ft2-F) compared to regular ENERGY STAR windows (U-factor 0.35 Btu/hr-ft2-F). Energy savings from lower U-factors were simulated with RESFEN over an assumed useful window life of 25 years. To determine the maximum incremental cost at which highly-insulating windows would still be cost-effective, we used a formula used by many utility companies to calculate the cost of saved energy from energy efficiency programs, based on the programs' cost and savings. We turned this formula around so that the cost of saved energy equals the present energy prices in the studied locations, whereas the program cost (the incremental cost of the windows) is the dependent variable. By entering 5%

235

What's in a Service?  

Science Conference Proceedings (OSTI)

A proper understanding of the general nature, potential and obligations of electronic services may be achieved by examining existing commercial services in detail. The everyday services that surround us, and the ways in which we engage with them, are ... Keywords: electronic services, service description, service properties, service substitution

Justin O'Sullivan; David Edmond; Arthur Ter Hofstede

2002-09-01T23:59:59.000Z

236

Energy Service Companies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Service Companies Service Companies Energy Service Companies October 7, 2013 - 1:43pm Addthis Energy service companies (ESCOs) develop, install, and fund projects designed to improve energy efficiency and reduce operation and maintenance costs in their customers' facilities. ESCOs generally act as project developers for a wide range of tasks and assume the technical and performance risk associated with the project. ESCOs are set apart from other firms that offer energy-efficiency improvements by performance-based contracting. When an ESCO undertakes a project, the company's compensation is directly linked to the cost savings from energy actually saved. The comprehensive energy-efficiency retrofits inherent in energy service company projects typically require a large initial capital investment and

237

Public Service Commission Authorization to Utilize an Alternative Method of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Service Commission Authorization to Utilize an Alternative Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) < Back Eligibility Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Mississippi Program Type Green Power Purchasing Industry Recruitment/Support Performance-Based Incentive Public Benefits Fund Provider Public Service Commission The Senate Bill 2793 authorizes the Public Service Commission (PSC) to

238

Transparent Cost Database | Transparent Cost Database  

Open Energy Info (EERE)

Hide data for this chart (-)Show data for this chart (+) Loading data... Transparent Cost Database Generation Showing: Historical Projections Year Published: Release mouse to...

239

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

240

Services | Open Energy Information  

Open Energy Info (EERE)

Services Jump to: navigation, search TODO: Add description Related Links List of Companies in Services Sector Retrieved from "http:en.openei.orgwindex.php?titleServices&oldid...

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

UNDP-Energy Costing Tool | Open Energy Information  

Open Energy Info (EERE)

UNDP-Energy Costing Tool UNDP-Energy Costing Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNDP Energy Costing Tool Agency/Company /Organization: United Nations Development Programme Sector: Energy Topics: Pathways analysis, Resource assessment Resource Type: Software/modeling tools User Interface: Spreadsheet Website: www.undp.org/energy/mdg-serv.htm Cost: Free Equivalent URI: cleanenergysolutions.org/content/energy-costing-tool Language: English References: UNDP MDG Support Services [1] The Energy Costing Tool is an Excel-based model designed to help countries estimate the costs of increasing access to energy services to support the achievement of the UN Millennium Development Goals (MGD). More information is available on the Energy

242

Early Station Costs Questionnaire  

NLE Websites -- All DOE Office Websites (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

243

Low Cost, Durable Seal  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost, Durable Seal Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability Transportation: 5,000 hr Stationary: 40,000 hr Durability Improve mechanical and chemical stability to achieve 40,000 hr of useful operating life. Low Cost Low Cost A material cost equivalent to or less than the cost of silicones in common use. 3 LOW COST, DURABLE SEAL

244

Service Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ASSIGNMENTS ASSIGNMENTS Pamela Arias-Ortega - Administrative and judicial litigation; and personnel law and workforce discipline mailto:parias-ortega@doeal.gov Celina Baca - Research and special projects for litigation and general law group mailto:cbaca@doeal.gov Dick Blakely - Designated Agency Ethics Advisor - Administrative litigation and mediation services; and ethics mailto:rblakely@doeal.gov Jonathan Buckner - Administrative review hearings; and administrative hearings before EEOC and MSPB mailto:jbuckner@doeal.gov Sean Counce - Administrative review hearings; and administrative hearings before EEOC and MSPB mailto:scounce@doeal.gov Diana Cruz - Copyright program; intellectual property databases; support for IP issues; and time and attendance mailto:dcruz@doeal.gov

245

OOTW COST TOOLS  

Science Conference Proceedings (OSTI)

This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

HARTLEY, D.S.III; PACKARD, S.L.

1998-09-01T23:59:59.000Z

246

The Time Cost of Tornado Warnings and the Savings with Storm-Based Warnings  

Science Conference Proceedings (OSTI)

The authors examine the cost of time spent under tornado warnings issued annually by the National Weather Service (NWS). County-based tornado warnings imposed substantial costs on the nation: an average of 234 million person-hours spent under ...

Daniel Sutter; Somer Erickson

2010-04-01T23:59:59.000Z

247

California Institute of Technology Office of Financial Services  

E-Print Network (OSTI)

of the nature of the fabricated equipment in the proposal narrative and inclusion of the estimated costs1 California Institute of Technology Office of Financial Services Equipment Fabrication Process, indirect cost rate or overhead rate) will not apply to costs accumulated in an equipment fabrication

Bruck, Jehoshua (Shuki)

248

NIST Measurement Services  

Science Conference Proceedings (OSTI)

... Standard Reference Materials • Laboratory accreditation services (NVLAP) ? DIY – You can do it; we can help. ? Services for legal metrology labs ...

2013-06-16T23:59:59.000Z

249

Biometric Web Services  

Science Conference Proceedings (OSTI)

... Biometric Web Services. ... This page last updated Thursday, November 14, 2013. Join the Biometric Web Services Mailing List. ...

2013-11-14T23:59:59.000Z

250

On-Site Services  

Science Conference Proceedings (OSTI)

... the Boulder Laboratories Employees Association ... a variety of health services including emergency ... emergency ambulance service; administration of ...

2010-12-21T23:59:59.000Z

251

Services | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Services Services Diversity and Inclusion Supporting Small Businesses Minority Economic Impact Partnering with Minority Serving Institutions Protecting Civil Rights Integrating...

252

Ontario's Industrial Energy Services Program  

E-Print Network (OSTI)

The Ontario Ministry of Energy began offering its new Industrial Energy Services Program (IESP) in early 1987. This 3-year, $5-million program, while not new in concept, is thought to be unique for its depth of service and method of delivery. It provides Ontario's manufacturers with advice and funding assistance for the identification and definition of industrial energy efficiency opportunities. The first phase provides for a free comprehensive site energy audit/analysis, conducted over one to five days, by teams of private sector consultants, selected to match expertise with manufacturer's needs. The emphasis is on process and equipment improvements, but site services and buildings are also examined. The final report includes detailed descriptions of major opportunities, along with estimated costs, savings, and paybacks. The next phases provide for sharing the detailed feasibility study costs and project engineering costs for those energy projects that move to implementation. In this paper, the author briefly describes the novel administrative structure of the program, presents the results of the activities to date, and describes, in some detail, several case studies from different industrial sectors.

Ploeger, L. K.

1987-09-01T23:59:59.000Z

253

Operations Cost Allocation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

254

Minimum Cost Arborescences ?  

E-Print Network (OSTI)

In this paper, we analyze the cost allocation problem when a group of agents or nodes have to be connected to a source, and where the cost matrix describing the cost of connecting each pair of agents is not necessarily symmetric, thus extending the well-studied problem of minimum cost spanning tree games, where the costs are assumed to be symmetric. The focus is on rules which satisfy axioms representing incentive and fairness properties. We show that while some results are similar, there are also significant differences between the frameworks corresponding to symmetric and asymmetric cost matrices.

Bhaskar Dutta; Debasis Mishra; We Thank Daniel Granot; Anirban Kar; Herve Moulin For Comments

2011-01-01T23:59:59.000Z

255

Nuclear fuel cycle costs  

Science Conference Proceedings (OSTI)

The costs for the back-end of the nuclear fuel cycle, which were developed as part of the Nonproliferation Alternative Systems Assessment Program (NASAP), are presented. Total fuel cycle costs are given for the pressurized water reactor once-through and fuel recycle systems, and for the liquid-metal fast breeder reactor system. These calculations show that fuel cycle costs are a small part of the total power costs. For breeder reactors, fuel cycle costs are about half that of the present once-through system. The total power cost of the breeder reactor system is greater than that of light-water reactor at today's prices for uranium and enrichment.

Burch, W.D.; Haire, M.J.; Rainey, R.H.

1982-02-01T23:59:59.000Z

256

Using Kansei Engineering with new JIT to accomplish cost advantage  

Science Conference Proceedings (OSTI)

With a shift from 'product-out' to 'market-in' approach, the demands of today's consumer for high-quality goods and service have forced producers and service providers to apply quality-management practice throughout ... Keywords: Kansei engineering, TPS, Toyota development system, Toyota marketing manufacturing system, Toyota production system, information technology, just in time, manufacturing costs, new JIT, simulation

Jay Rajasekera; Shantanu Dayal

2010-02-01T23:59:59.000Z

257

Actinide Partitioning-Transmutation Program Final Report. V. Preconceptual designs and costs of partitioning facilities and shipping casks (appendix 3)  

SciTech Connect

This Appendix contains cost estimate documents for the Fuels Reprocessing Plant Waste Treatment Facility. Plant costs are summarized by Code of Accounts and by Process Function. Costs contribution to each account are detailed. Process equipment costs are detailed for each Waste Treatment Process. Service utility costs are also summarized and detailed.

Not Available

1980-06-01T23:59:59.000Z

258

NSLS Services | User Accounts  

NLE Websites -- All DOE Office Websites (Extended Search)

User Accounts User Accounts Operating Accounts (81000 accounts) General Users who are allocated beam time and Participating Research Teams (PRTs) or Contributing Users (CUs) who operate beamlines should establish a BNL operating account to cover the costs of materials while running an experiment, shipping, and/or miscellaneous BNL services (telephone & fax codes), if these needs are anticipated. The term of the purchase order must be specified and names of persons having signature authorization for charges against this account must be listed. Brookhaven's Fiscal Division will bill the user for any charges the user makes to the account. Users are obligated to pay outstanding debts promptly. All users should set up a $1,000 operating account to cover operating expenses while at the NSLS, such as charges for use of trades, shops, and

259

Financing for Utility Energy Service Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Financing for Utility Energy Service Contracts Financing for Utility Energy Service Contracts Financing for Utility Energy Service Contracts October 7, 2013 - 2:21pm Addthis Financing is a significant portion of utility energy service contract (UESC) costs. Experience shows several things the Federal Government can do to get the best value by reducing UESC financial transaction costs and interest. Interest Rates Interest rates are based on the sum of an index rate on the date the transaction is signed and a "premium" or "adders" usually measured in basis points where 100 basis points is equal to 1%. The premium reflects the costs of obtaining the financing under prevailing market conditions, financial risk, transaction costs, and profit for the finance company. The cost of financing varies depending upon a number of factors. Optimizing

260

Role of Data Communications in Hybrid Cloud Costs  

Science Conference Proceedings (OSTI)

Rapid adoption of cloud services in recent years has been driven by multiple factors, such as faster time-to-market and improved scalability enabled by public cloud infrastructure. Hybrid clouds, combining the in-house capacities with on-demand capacity ... Keywords: hybrid cloud, cost model, data communications cost

Oleksiy Mazhelis; Pasi Tyrvainen

2011-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Hydrogen Threshold Cost Calculation  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Record (Offices of Fuel Cell Technologies) Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing vehicles [gasoline in hybrid-electric vehicles (HEVs)] in 2020. This record documents the methodology and assumptions used to calculate that threshold cost. Principles: The cost threshold analysis is a "top-down" analysis of the cost at which hydrogen would be

262

Hydrogen Pathway Cost Distributions  

NLE Websites -- All DOE Office Websites (Extended Search)

Pathway Cost Distributions Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric hybrids are benchmarks * R&D guidance provided in two forms * Evolved gasoline ICE defines a threshold hydrogen cost used to screen or eliminate options which can't show ability to meet target * Gasoline-electric hybrid defines a lower hydrogen cost used to prioritize projects for resource allocation

263

Documents: Cost Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Search Documents: Search PDF Documents View a list of all documents Cost Analysis PDF Icon Summary of the Cost Analysis Report for the Long-term Management of Depleted UF6...

264

Reduce Oil Dependence Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Reduce Oil Dependence Costs U.S. Petroleum Use, 1970-2010 Nearly 40% of the oil we use is imported, costing us roughly 300 billion annually. Increased domestic oil production from...

265

Chemical Lifecycle Management Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Lifecycle Management Cost Presented by: J.M. Hieb, CH2M HILL Plateau Remediation Company CHPRC1204-04 Chemical Lifecycle Management Cost Everyone is trying to stretch a...

266

Cost Estimation Recommendations  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

267

Rates & Repayment  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Rate Adjustments Transmission Ancillary Services Rates WAPA-137 Rate Order Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Rate Adjustments Transmission Ancillary Services Rates WAPA-137 Rate Order Rates and Repayment Services Rates Current and Historical Rate Information Collbran Power Rates CRSP Power Rates CRSP Transmission System Rates CRSP Management Center interest rates Falcon-Amistad Power Rates Provo River Power Rates Rio Grande Power Rates Seedskadee Power Rates SLCA/IP Power Rates Rate Schedules & Supplemental Rate Information Current Rates for Firm Power, Firm & Non-firm Transmission Service, & Ancillary Services Current Transmission & Ancillary Services Rates Tariffs Components of the SLCA/IP Existing Firm Power Rate Cost Recovery Charge (CRC) Page MOA Concerning the Upper Colorado River Basin

268

Conference Services .:. Lawrence Berkeley National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

9/24/13 9/24/13 Welcome to Conference Services News Flash! OFFSITE MEAL RATES: Effective immediately, all offsite meal costs are limited to 150% of per diem per meal. Read about the new rates here. Please also check the GSA website when planning meetings offsite for per diem rates in areas other than Oakland, Berkeley and Walnut Creek. For more information please contact conference services. Thank you. Quick Tools Step-by-Step Guide Event Equipment Rental Sample Agenda Event Questionnaire 5 Points of Compliance for Food & Beverage Email Us Conference Service's Vision is to provide professional, strategic conference planning to further scientific discovery balancing cost-effectiveness and compliance requirements. Services: DOE Conference Reporting Event Approval Database Management

269

Power Plant Cycling Costs  

Science Conference Proceedings (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

270

Tax and Fee Payments by Motor-Vehicle Users for the Use of Highways, Fuels, and Vehicles: Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

the Full Social Costs and Benefits of Transportation, ed. bythe Full Social Costs and Benefits of Transportation, ed. bytransportation infrastructure and services, then we should set prices on the infrastructure and services equal to marginal social costs.

Delucchi, Mark

2005-01-01T23:59:59.000Z

271

Dissecting the Cost of the Smart Grid | Open Energy Information  

Open Energy Info (EERE)

Dissecting the Cost of the Smart Grid Dissecting the Cost of the Smart Grid Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Dissecting the Cost of the Smart Grid Focus Area: Crosscutting Topics: System & Application Design Website: www.greentechmedia.com/articles/read/dissecting-the-cost-of-the-smart- Equivalent URI: cleanenergysolutions.org/content/dissecting-cost-smart-grid Language: English Policies: Regulations Regulations: "Resource Integration Planning,Cost Recovery/Allocation,Net Metering & Interconnection" is not in the list of possible values (Agriculture Efficiency Requirements, Appliance & Equipment Standards and Required Labeling, Audit Requirements, Building Certification, Building Codes, Cost Recovery/Allocation, Emissions Mitigation Scheme, Emissions Standards, Enabling Legislation, Energy Standards, Feebates, Feed-in Tariffs, Fuel Efficiency Standards, Incandescent Phase-Out, Mandates/Targets, Net Metering & Interconnection, Resource Integration Planning, Safety Standards, Upgrade Requirements, Utility/Electricity Service Costs) for this property.

272

Alternative Fuels Data Center: Vehicle Incremental Cost Allocation  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Incremental Vehicle Incremental Cost Allocation to someone by E-mail Share Alternative Fuels Data Center: Vehicle Incremental Cost Allocation on Facebook Tweet about Alternative Fuels Data Center: Vehicle Incremental Cost Allocation on Twitter Bookmark Alternative Fuels Data Center: Vehicle Incremental Cost Allocation on Google Bookmark Alternative Fuels Data Center: Vehicle Incremental Cost Allocation on Delicious Rank Alternative Fuels Data Center: Vehicle Incremental Cost Allocation on Digg Find More places to share Alternative Fuels Data Center: Vehicle Incremental Cost Allocation on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Vehicle Incremental Cost Allocation The U.S. General Services Administration (GSA) must allocate the

273

Incentive Cost Recovery Rule for Nuclear Power Generation (Louisiana) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Incentive Cost Recovery Rule for Nuclear Power Generation (Louisiana) Incentive Cost Recovery Rule for Nuclear Power Generation (Louisiana) < Back Eligibility Commercial Construction Industrial Utility Program Info State Louisiana Program Type Fees Generating Facility Rate-Making Provider Louisiana Public Service Commission The Incentive Cost Recovery Rule for Nuclear Power Generation establishes guidelines for any utility seeking to develop a nuclear power plant in Louisiana. The rule clarifies, as well as supplements the Louisiana Public Service Commission's 1983 General Order for the acquisition of nuclear generation resources. The goal of the rule is to provide a transparent process that identifies the responsibilities parties in the regulatory

274

RENSSELAER POLYTECHNIC INSTITUTE DC EMPLOYER Plan Services and Costs  

E-Print Network (OSTI)

providers: - TIAA-CREF - Fidelity Investments TIAA-CREF Right to Direct Investments You may specify how your as described in the Summary Plan Document. These changes can be made: 1. Online by visiting tiaa-cref.org 2. A current list of investment options and detailed descriptions of each one is available online at www.tiaa

Bystroff, Chris

275

PRINCETON UNIVERSITY RETIREMENT SAVINGS PLAN Plan Services and Costs  

E-Print Network (OSTI)

. - TIAA-CREF - Vanguard TIAA-CREF Right to Direct Investments You may specify how your future in the Summary Plan Document. These changes can be made: 1. Online by visiting tiaa-cref.org 2. By phone at 800 and detailed descriptions of each one is available online at www.tiaa-cref.org/planinvestmentoptions, enter

Rowley, Clarence W.

276

Smarter Meters Help Customers Budget Electric Service Costs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1) two-way communications which allow customers to monitor their electricity consumption and take steps to better manage their electric bills; 2) a voluntary, pre-payment...

277

Restructuring local distribution services: Possibilities and limitations  

SciTech Connect

The restructuring of local distribution services is now the focus of the natural gas industry. It is the last major step in the ``reconstitution`` of the natural gas industry and a critical clement in realizing the full benefits of regulatory and market reforms that already have taken place in the wellhead and interstate markets. It could also be the most important regulatory initiative for most end-use customers because they are affected directly by the costs and reliability of distribution services. Several factors contribute to the current emphasis on distribution service restructuring. They include the unbundling and restructuring of upstream markets, a realization of the limitations of supply-side options (such as gas procurement oversight), and the increased diversity and volatility of gas demand facing local distribution companies. Local distribution service is not one but a series of activities that start with commodity gas procurement and extend to transportation, load balancing, storage, and metering and billing of services provided. There are also considerable differences in the economies of scale and scope associated with these various activities. Thus, a mixture of supply arrangements (such as a competitive market or a monopoly) is required for the most efficient delivery of local distribution services. A distinction must be made between the supply of commodity gas and the provision of a bundled distribution service. This distinction and identification of the best supply arrangements for various distribution service components are the most critical factors in developing appropriate restructuring policies. For most state public utility commissions the criteria for service restructuring should include pursuing the economies of scale and scope in gas distribution, differentiating and matching gas service reliability and quality with customer requirements, and controlling costs associated with the search, negotiation, and contracting of gas services.

Duann, D.J.

1994-08-01T23:59:59.000Z

278

Report on Audit of Architect and Engineering Costs at the Idaho National Engineering Laboratory  

SciTech Connect

In September 1990 the Office of Inspector General (OIG) issued the Department-wide Audit of Architect and Engineering Design Costs (DOE/IG-0289) which concluded that the Department`s A/E costs averaged more than twice that of private industry. The primary cause of the higher costs was the lack of Departmental A/E cost standards that would provide measurement criteria for controlling costs. Consistent with our prior Department-wide audit, the purpose of this audit was to determine whether A/E services performed at the Laboratory were economical. Specifically, we determined whether the costs for A/E services at the Laboratory were comparable to the cost standards for A/E services in industry and the State; and, whether A/E costs were reasonable.

1996-03-22T23:59:59.000Z

279

Commercial equipment cost database  

SciTech Connect

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

280

Technical Services | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Technical Technical Services Technical Services Technical services spans Y-12 disciplines that support manufacturing at Y-12. Information Systems (National Security Systems Development) Provide solutions for information security, including the protection of national security, proprietary and any other class of highly sensitive information. Develop highly integrated, enterprise level software applications for use within the federal space and adaptable to commercial application. Leverage the transformative information technology capabilities of the NNSA to a broad spectrum of federal applications for rapidly deployed, cost effective and reproducible technical solutions. Develop virtual collaborative networks for cluster manufacturing. Develop, test, and implement operational cyber security strategies

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Career Services Pricing Information  

Science Conference Proceedings (OSTI)

Job/Resume Posting and Prices Career Services Pricing Information Career Services Career Services chemistry jobs classifieds employment fats global help wanted job Jobs member membership network oils science jobs ...

282

A flexible service selection for executing virtual services  

Science Conference Proceedings (OSTI)

With the adoption of a service-oriented paradigm on the Web, many software services are likely to fulfil similar functional needs for end-users. We propose to aggregate functionally equivalent software services within one single virtual service, that ... Keywords: marketplace, service aggregation, service discovery, service selection, service selector, virtual service

Nassim Laga; Emmanuel Bertin; Noel Crespi; Ivan Bedini; Benjamin Molina; Zhenzhen Zhao

2013-05-01T23:59:59.000Z

283

Methods | Transparent Cost Database  

Open Energy Info (EERE)

Methods Methods Disclaimer The data gathered here are for informational purposes only. Inclusion of a report in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a single discount rate in order to compare technology costs only. About the Cost Database For emerging energy technologies, a variety of cost and performance numbers are cited in presentations and reports for present-day characteristics and potential improvements. Amid a variety of sources and methods for these data, the Office of Energy Efficiency and Renewable Energy's technology development programs determine estimates for use in program planning. The Transparent Cost Database collects program cost and performance

284

Low cost MCFC anodes  

DOE Green Energy (OSTI)

This paper outlines a project, funded under a DOE SBIR grant, which tested a potentially lower cost method of manufacturing MCFC stack anodes and evaluated the feasibility of using the technology in the existing M-C Power Corp. manufacturing facility. The procedure involves adding activator salts to the anode tape casting slurry with the Ni and Cr or Al powders. Two different processes occur during heat treatment in a reducing environment: sintering of the base Ni structure, and alloying or cementation of the Cr or Al powders. To determine whether it was cost-effective to implement the cementation alloying manufacturing process, the M-C Power manufacturing cost model was used to determine the impact of different material costs and processing parameters on total anode cost. Cost analysis included equipment expenditures and facility modifications required by the cementation alloying process.

Erickson, D.S.

1996-12-31T23:59:59.000Z

285

What solar heating costs  

SciTech Connect

Few people know why solar energy systems cost what they do. Designers and installers know what whole packages cost, but rarely how much goes to piping, how much for labor and how much for the collectors. Yet one stands a better chance of controlling costs if one can compare where the money is going against where it should be going. A detailed Tennessee Valley Authority study of large solar projects shows how much each component contributes to the total bill.

Adams, J.A.

1985-05-01T23:59:59.000Z

286

Cost analysis guidelines  

Science Conference Proceedings (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

287

CAES Updated Cost Assessment  

Science Conference Proceedings (OSTI)

Compressed Air Energy Storage Systems (CAES) for bulk energy storage applications have been receiving renewed interest. Increased penetration of large quantities of intermittent wind generation are requiring utilities to re-examine the cost and value of CAES systems. New second generation CAES cycles have been identified which offer the potential for lower capital and operating costs. This project was undertaken to update and summarize the capital and operating costs and performance features of second ge...

2008-12-23T23:59:59.000Z

288

Chapter 41 Acquisition of Utility Services - This Chapter has...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 41 Acquisition of Utility Services - This Chapter has been revised and updated. The changes are editorial in nature. Chapter 42.1 Indirect Cost Rates - This Chapter has...

289

NIST Internet Time Service  

Science Conference Proceedings (OSTI)

... All services available. ntp-nist.ldsbc.edu, 198.60.73.8, LDSBC, Salt Lake City, Utah, All services available. nist1-lv.ustiming ...

290

ORISE: Health physics services  

NLE Websites -- All DOE Office Websites (Extended Search)

Health physics services Nuclear power plant The Oak Ridge Institute for Science and Education (ORISE) offers comprehensive health physics services in a number of technical areas...

291

Topic: Service Life Prediction  

Science Conference Proceedings (OSTI)

Topic: Service Life Prediction. Event. 24th NIST Computer Modeling Workshop. ... Service Life Prediction of Polymeric Materials: Vision for the Future. ...

2012-09-19T23:59:59.000Z

292

ORNL Health Services Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Page ORNL Home | ESH&Q Home | Health Services Internal A division in the Environment, Safety, Health, and Quality Directorate The Health Services Division at Oak Ridge...

293

Target Cost Management Strategy  

E-Print Network (OSTI)

Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

Okano, Hiroshi

1996-01-01T23:59:59.000Z

294

Cost Affordable Titanium IV  

Science Conference Proceedings (OSTI)

Jul 31, 2012 ... Enhancing the Cost Effectiveness of High Performance Titanium Alloy Component Production by Powder Metallurgy · Evolution of Texture in ...

295

Cost Effective Single Crystals  

Science Conference Proceedings (OSTI)

three relevant technologies, namely casting, alloy development and orientation measurement, developed by Rolls-Royce to enable the cost effective production.

296

Sharing Supermodular Costs  

E-Print Network (OSTI)

the costs collectively incurred by a group of cooperating agents. ..... Mixed integer programming formulations for production planning and scheduling prob- lems.

297

Petroleum well costs.  

E-Print Network (OSTI)

??This is the first academic study of well costs and drilling times for Australia?s petroleum producing basins, both onshore and offshore. I analyse a substantial… (more)

Leamon, Gregory Robert

2006-01-01T23:59:59.000Z

298

COST REVIEW and ESTIMATING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Programming Guide. OMB Circular A-94, Guidelines and Discount Rates for Benefit-Cost Analysis of Federal Programs, dated October 29, 1992 Page | 41 APPENDIX A ICRICE...

299

The Cost of Debt ?  

E-Print Network (OSTI)

We estimate firm-specific marginal cost of debt functions for a large panel of companies between 1980 and 2007. The marginal cost curves are identified by exogenous variation in the marginal tax benefits of debt. The location of a given company’s cost of debt function varies with characteristics such as asset collateral, size, book-to-market, asset tangibility, cash flows, and whether the firm pays dividends. By integrating the area between benefit and cost functions we estimate that the equilibrium net benefit of debt is 3.5 % of asset value, resulting from an estimated gross benefit of debt of 10.4 % of asset value and an estimated cost of debt of 6.9%. We find that the cost of being overlevered is asymmetrically higher than the cost of being underlevered and that expected default costs constitute approximately half of the total ex ante cost of debt. We thank Rick Green (the Acting Editor), and an anonymous referee, Heitor Almeida, Ravi Bansal,

Jules H. Van Binsbergen; John R. Graham; Jie Yang

2010-01-01T23:59:59.000Z

300

Hydrogen and Infrastructure Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of...

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Reducing Energy Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy expense is becoming increasingly dominant in the operating costs of high-performance computing (HPC) systems. At the same time, electricity prices vary significantly at...

302

Environment/Health/Safety (EHS): Environmental Services Group (ESG)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Services Group Environmental Services Group Whom To Call Operating Permits For LBNL Activities Publications Advisories Internal Documents Environmental Management System Environmental Restoration Program Weather Data Image of Chicken Creek The Environmental Services Group, within the Environment, Health and Safety Division, provides a comprehensive range of cost-effective environmental management services to Berkeley Lab by working with research and support staff. Services include: Your visit may be enhanced by upgrading or installing the latest Flash Player. ESG sampling activity Air and Water Quality Management Hazardous Materials Management Environmental Monitoring Radiological Dose and Environmental Risk Assessment Environmental Management System Environmental Restoration News & Updates

303

Cost-Affordable Titanium III  

Science Conference Proceedings (OSTI)

Cost-Effective Production and Thermomechanical Consolidation of Titanium Alloy Powders · Cost Affordable Developments in Titanium Technology and ...

304

Telephone Service | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Telephone Service Telephone Service Set Up a Teleconference Call A teleconference allows people to converse by sharing a common phone number and password and dialing in at a predetermined time. To set up a teleconference, submit an online request to the phone operators at least 1 hour before the conference start time. Requests are processed and confirmations are sent during normal business hours. You will also need to supply an Argonne cost code. Submit a Teleconference Request (log in with your Argonne username and password) Documentation Forward Your Telephone Calls Depending on what model of phone you have, you can send your incoming Argonne calls to another telephone. On an EADS Telecom STE model To turn call fowarding on, press *3 and enter the destination telepone number.

305

Software Cost Estimation  

E-Print Network (OSTI)

Software cost estimation is the process of predicting the effort required to develop a software system. Many estimation models have been proposed over the last 30 years. This paper provides a general overview of software cost estimation methods including the recent advances in the field. As a number of these models rely on a software size estimate as input, we first provide an overview of common size metrics. We then highlight the cost estimation models that have been proposed and used successfully. Models may be classified into 2 major categories: algorithmic and non-algorithmic. Each has its own strengths and weaknesses. A key factor in selecting a cost estimation model is the accuracy of its estimates. Unfortunately, despite the large body of experience with estimation models, the accuracy of these models is not satisfactory. The paper includes comment on the performance of the estimation models and description of several newer approaches to cost estimation.

Hareton Leung Zhang; Zhang Fan

2002-01-01T23:59:59.000Z

306

This Guide is designed to provide assistance to the community regarding the direct charging of costs to sponsored projects while maintaining compliance with the Federal cost principles (2 CFR Part 220, OMB  

E-Print Network (OSTI)

charging of costs to sponsored projects while maintaining compliance with the Federal cost principles (2. Typical costs charged directly to a sponsored project include: 1. compensation of employees incurred for the sponsored project. Costs of materials from stock/services rendered by specialized

307

Portable top drive cuts horizontal drilling costs  

SciTech Connect

Economic analysis of a seven-well, long-reach horizontal drilling program into an unconsolidated, heavy-oil-bearing reservoir in Winter field near the Alberta/Saskatchewan border in Canada reveals that -- in the right application -- renting a portable top drive drilling system can reduce total drilling costs. Use of the portable top drive combined with other cost-saving measures enabled Saskoil, one of Canada`s larger independents, to drill more cheaply, on a cost-per-meter basis, in 1993 than in 1992. This was despite significant rental rates for drilling rigs and directional drilling services caused by increased demand in Western Canada. Total cost savings of 10% on wells that would otherwise cost in the (C) $500,000 range are believed realistic. Based on this year`s performance, Saskoil recommends top drive for the company`s future horizontal wells in this area. This article describes the operator`s horizontal well program, advantages of top drive in that program and how it was installed and applied. Estimated time savings for six wells, plus other ways top drive can cut costs and improve operations are discussed.

Jackson, B. [Saskoil, Regina, Saskatchewan (Canada); Yager, D. [Tesco Drilling Tech., Calgary, Alberta (Canada)

1993-11-01T23:59:59.000Z

308

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

309

Service Life Prediction  

Science Conference Proceedings (OSTI)

Prediction of Service Life of Reinforced Concrete Structure Exposed to Chlorides. Please supply the following parameters ...

2013-09-10T23:59:59.000Z

310

Making Web services tradable  

Science Conference Proceedings (OSTI)

In service-oriented architectures, applications are developed by incorporating services which are often provided by different organizations. Since a service might be offered under different configurations by various different organizations, sophisticated ... Keywords: Automated negotiations, Preferences for functional/non-functional properties, Web service policies

Sudhir Agarwal; Steffen Lamparter; Rudi Studer

2009-01-01T23:59:59.000Z

311

Cross technology comparison for information services in rural Bangladesh  

Science Conference Proceedings (OSTI)

This paper introduces a framework to examine the relative effectiveness and cost-effectiveness of different information and communications technologies to deliver a range of social services in rural Bangladesh. It focuses particularly on major sectors ... Keywords: ICTD, community, radio, rural information service, telecenter

Faheem Hussain; Rahul Tongia

2009-04-01T23:59:59.000Z

312

Prescribed Burning Costs: Trends and Influences in the National Forest System1  

E-Print Network (OSTI)

Prescribed Burning Costs: Trends and Influences in the National Forest System1 David A. Cleaves,2 Service's National Forest System prescribed burning activity and costs are examined. Fuels management officers from 95 National Forests reported costs and acreage burned for 4 types of prescribed fire

Standiford, Richard B.

313

Equilibrium in a two dimensional queueing game: When inspecting the queue is costly  

E-Print Network (OSTI)

Equilibrium in a two dimensional queueing game: When inspecting the queue is costly Refael Hassin parameters such as waiting time and cost, inspection cost, service quality, etc. An appropriate model are established in supermodular and submodu- lar games (Topicks (1979), Yao (1995)). Supermodular (submodular

Hassin, Refael

314

Service Water Piping Guideline  

Science Conference Proceedings (OSTI)

In the years 1988 and 1989, EPRI organized the Service Water Working Group (SWWG) to identify and help resolve the many issues surrounding service water (SW) systems in nuclear power plants. One issue identified by the SWWG was corrosion in service water piping systems. Interest in this issue resulted in the development of several technical reports: Guidelines for the Repair/Replacement Welding of Nuclear Service Water Systems, TR-100386; Guide for the Examination of Service Water System Piping, TR-10206...

2005-09-30T23:59:59.000Z

315

Lookin g for data personnel costs, indirect costs, equipment costs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Negotiating Group Question/Answer Sessions November 19, 2009 Q: What happens now? A: The negotiation process starts tomorrow [November 20, 2009], when DOE will be sending the Awardees an e-mail with information about which website to go to for clarification and direction, information from the Office of Civil Rights, and answers to some of the questions that came up in the meeting. DOE will be gathering information about the questions concerning cyber requirements, metrics, and reporting requirements and will be getting back to the awardees about those issues the week after Thanksgiving. We have done a review of the budgets, and emails will be sent giving opportunities to address any issues. We will also re-review technical and cost proposals.

316

www.noaa.gov/climate Proposed Climate Service in NOAA  

E-Print Network (OSTI)

industry, which in-turn developed new insulation standards for protecting building foundations from frost, September 2010 Climate Service Example: Construction NOAA provides air-freezing data to the home building. This resulted in annual building cost savings of $330 million and energy cost savings of 586,000 megawatt

317

Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Next Vehicle Cost Calculator U.S. Department of Energy Energy Efficiency and Renewable Energy...

318

Food Service Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Service Service Characteristics by Activity... Food Service Food service buildings are those used for preparation and sale of food and beverages for consumption. Basic Characteristics [ See also: Equipment | Activity Subcategories | Energy Use ] Food Service Buildings... An overwhelming majority (72 percent) of food service buildings were small buildings (1,001 to 5,000 square feet). Tables: Buildings and Size Data by Basic Characteristics Establishment, Employment, and Age Data by Characteristics Number of Food Service Buildings by Predominant Building Size Categories Figure showing number of food service buildings by size. If you need assistance viewing this page, please contact 202-586-8800. Equipment Table: Buildings, Size, and Age Data by Equipment Types Predominant Heating Equipment Types in Food Service Buildings

319

FY 1995 cost savings report  

SciTech Connect

Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with an 8 percent reduction in our Environmental Management budget but at the same time were tasked with accomplishing additional workscope. This resulted in a Productivity Challenge whereby we took on more work at the beginning of the year than we had funding to complete. During the year, the Productivity Challenge actually grew to 23 percent because of recissions, Congressional budget reductions, and DOE Headquarters actions. We successfully met our FY 1995 Productivity Challenge through an aggressive cost reduction program that identified and eliminated unnecessary workscope and found ways to be more efficient. We reduced the size of the workforce, cut overhead expenses, eliminated paperwork, cancelled construction of new facilities, and reengineered our processes. We are proving we can get the job done better and for less money at Hanford. DOE`s drive to do it ``better, faster, cheaper`` has led us to look for more and larger partnerships with the private sector. The biggest will be privatization of Hanford`s Tank Waste Remediation System, which will turn liquid tank waste into glass logs for eventual disposal. We will also save millions of dollars and avoid the cost of replacing aging steam plants by contracting Hanford`s energy needs to a private company. Other privatization successes include the Hanford Mail Service, a spinoff of advanced technical training, low level mixed waste thermal treatment, and transfer of the Hanford Museums of Science and history to a private non-profit organization. Despite the rough roads and uncertainty we faced in FY 1995, less than 3 percent of our work fell behind schedule, while the work that was performed was completed with an 8.6 percent cost under-run. We not only met the FY 1995 productivity challenge, we also met our FY 1995-1998 savings commitments and accelerated some critical cleanup milestones. The challenges continue. Budgets remain on the decline, even while the expectations increase. Yet we are confident in our ability to keep our commitments and goals by identifying new efficiencies in the Hanford cleanup program. We will also pursue new contracting arrangements that will allow us to foster greater competition and use more commercial practices while maintaining our commitment to the safety and health of the public, our workers, and the environment.

Andrews-Smith, K.L., Westinghouse Hanford

1996-06-21T23:59:59.000Z

320

COSTS OF NUCLEAR POWER  

SciTech Connect

The discussion on the costs of nuclear power from stationary plants, designed primarily for the generation of electricity. deals with those plants in operation, being built, or being designed for construction at an early date. An attempt is made to consider the power costs on the basis of consistent definitions and assumptions for the various nuclear plants and for comparable fossil-fuel plants. Information on several new power reactor projects is included. (auth)

1961-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

HorsesHorses Purdue University Cooperative Extension Service West Lafayette IN, 47907  

E-Print Network (OSTI)

to on a horse facility. Estimate $7 per square foot of floor space as the absolute minimum cost for building will miss the pleasure of having your horse right outside your back door. It normally costs from $200-450 per month to board a horse, depending on the stable services. Extra care and training services

322

" Federal Utility Energy Service Contracts"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Utility Energy Service Contracts" Federal Utility Energy Service Contracts" "*KEY ON SHEET 2*" "Agency","Facility","Utility","Contract Type","Contract Term","Task Order/Delivery Order","Award Date","Completion Date","Energy Conservation Measures Implemented In Project (Enter as many as applicable - See Key)","Project's Capital Cost ($)","Percent of Total Cost 3rd Party Financed","Rebate Amount ($)","Estimated Annual Cost Savings ($)","Estimated Annual kWh Saved","Estimated Annual KW Saved","Estimated Annual Natural Gas savings (please specify cubic feet, therms or MMBtu)","Estimated Annual Oil savings (gallons)","Estimated Annual water savings (gallons)"

323

1.258J / 11.541J / ESD.226J Public Transportation Service and Operations Planning, Fall 2003  

E-Print Network (OSTI)

Evolution and role of urban public transportation modes, systems, and services, focussing on bus and rail. Description of technological characteristics and their impacts on capacity, service quality, and cost. Current ...

Wilson, Nigel H. M.

324

1.258J / 11.541J / ESD.226J Public Transportation Service and Operations Planning, Spring 2006  

E-Print Network (OSTI)

This course describes the evolution and role of urban public transportation modes, systems, and services, focusing on bus and rail. Technological characteristics and their impacts on capacity, service quality, and cost are ...

Wilson, Nigel

325

Processing Distinguished Service Award  

Science Conference Proceedings (OSTI)

Award honoring outstanding, meritorious service to the oilseed processing industry. Processing Distinguished Service Award Processing agricultural algae algal analytical aocs articles biomass biotechnology By-product Utilization courses detergents divisi

326

DOE Grids Service Transition  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Grids Service Transition DOE Grids Service Transition Services Overview ECS Audio/Video Conferencing Fasterdata IPv6 Network Network Performance Tools (perfSONAR) ESnet OID Registry PGP Key Service Virtual Circuits (OSCARS) DOE Grids Service Transition Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net DOE Grids Service Transition Background ESnet has decided to transition support and management for the certificate services provided by the DOE Grids public key infrastructure (PKI) to the Open Sciences Grid (OSG). OSG and ESnet provide service to many of the same user communities, and have long been collaborators in the areas of identity

327

Web services @ MIT  

E-Print Network (OSTI)

There are several useful web services developed at MIT by students, faculty and researchers. However, they are scattered all over MIT. Most people at MIT are unaware of the availability of these web services and hence they ...

Tyagi, Sapna DevendraSingh, 1978-

2004-01-01T23:59:59.000Z

328

Towards Service Description Logics  

Science Conference Proceedings (OSTI)

Semantic service description and matchmaking are needed in embedded and disappearing computing, cooperative multiagent systems, and the semantic web. Standard program semantics formalizations are not suited to modeling service semantics, because they ... Keywords: description logics, semantic web

Piero A. Bonatti

2002-09-01T23:59:59.000Z

329

Grammatical framework web service  

Science Conference Proceedings (OSTI)

We present a web service for natural language parsing, prediction, generation, and translation using grammars in Portable Grammar Format (PGF), the target format of the Grammatical Framework (GF) grammar compiler. The web service implementation is open ...

Björn Bringert; Krasimir Angelov; Aarne Ranta

2009-04-01T23:59:59.000Z

330

ORNL DAAC User Services  

NLE Websites -- All DOE Office Websites (Extended Search)

User Services Ready to Answer Your Questions The ORNL DAAC's User Services Office is the first point of contact for answering your questions concerning data and information held by...

331

Contract Awarded for Environmental Technical Services | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Awarded for Environmental Technical Services Contract Awarded for Environmental Technical Services Contract Awarded for Environmental Technical Services July 12, 2013 - 5:30pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) awarded a contract for Environmental Technical Services to Restoration Services Inc. of Oak Ridge, Tennessee, for support services at the Portsmouth Gaseous Diffusion Plant located near Piketon, OH. The contract was a competitive small business set-aside for a cost-plus-award-fee contract with an approximate value of $43 million, with a three-year base performance period plus one two-year option period. Services to be performed under the contract include: Program Management Planning and Integration Environmental Safety and Health (ES&H) and Quality Assurance (QA)

332

NSIT Computer Time Services: Internet Time Service (ITS) ...  

Science Conference Proceedings (OSTI)

Page 1. NIST Special Publication 250-59 NIST Computer Time Services: Internet Time Service (ITS), Automated Computer Time Service (ACTS), ...

2012-09-16T23:59:59.000Z

333

MSID Products, Tools, & Services  

Science Conference Proceedings (OSTI)

SID Products, Tools, & Services. XML Testbed - collection of XML-Related Tools; Express Engine - STEP (ISO 10303) development ...

2013-09-16T23:59:59.000Z

334

Legend Technical Services, Inc.  

Science Conference Proceedings (OSTI)

Legend Technical Services, Inc. NVLAP Lab Code: 102081-0. Address and Contact Information: 88 Empire Drive St. Paul ...

2013-09-20T23:59:59.000Z

335

Accountability as a service  

E-Print Network (OSTI)

We propose that accountability be a first-class network service, independent of addressing and routing. We design a scheme for allowing accountability services, rather than connectivity-providing ISPs, to vouch for traffic, allowing victims to report abuse, filter abusive traffic, and isolate malicious senders. We discuss how accountability services may evolve, how they may facilitate new applications, and the implications of shifting the burden of network policing to a dedicated service. 1

Adam Bender; Neil Spring; Dave Levin; Bobby Bhattacharjee

2007-01-01T23:59:59.000Z

336

Roadway Improvement Project Cost Allocation  

E-Print Network (OSTI)

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

337

Wind Electrolysis: Hydrogen Cost Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

which needs to be 44% or better along with relatively high wind speeds. Along with low production costs, however, delivery and storage costs will also factor into the final cost...

338

Diversifying Project Portfolios for Utility Energy Service Contracts |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Diversifying Project Portfolios for Utility Energy Service Diversifying Project Portfolios for Utility Energy Service Contracts Diversifying Project Portfolios for Utility Energy Service Contracts October 7, 2013 - 2:28pm Addthis Building a diversified project portfolio enhances utility energy service contracts (UESCs) to ensure Federal agencies get the best value possible. Energy efficiency measures are inherent in UESC projects. However, do not overlook the possibility for renewable energy and water efficiency and other conservation measures. Building a portfolio of energy service projects lowers overall contracting costs while increasing energy cost savings. This portfolio approach offers additional benefits by reducing contract and administrative burdens and optimizing energy savings. Renewable Energy Multiple laws and regulations require agencies to implement and use

339

DOE Seeks Proposals for Portsmouth Plant Technical Services | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plant Technical Services Plant Technical Services DOE Seeks Proposals for Portsmouth Plant Technical Services August 21, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati - The Department of Energy today issued a Request for Proposals (RFP) for an Environmental Technical Services acquisition at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio. The RFP proposes a cost-plus-award-fee contract for three-years with a one-time option out to five-years. The estimated cost and fee amount for the technical services contract is approximately $55-65 million. The major support areas within the draft RFP include: Program Management Planning and Integration Environmental Safety and Health (ES&H) and Quality Assurance (QA) Waste Management Regulatory Support

340

Natural Gas Regulation - Delaware Public Service Commission (Delaware) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Regulation - Delaware Public Service Commission Natural Gas Regulation - Delaware Public Service Commission (Delaware) Natural Gas Regulation - Delaware Public Service Commission (Delaware) < Back Eligibility Utility Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Fuel Distributor Program Info State Delaware Program Type Generating Facility Rate-Making Provider Delaware Public Service Commission The Delaware Public Service Commission regulates only the distribution of natural gas to Delaware consumers. The delivery and administrative costs associated with natural gas distribution are determined in base rate proceedings before the Commission. The recovery of costs associated with the natural gas used by customers is determined annually as part of fuel adjustment proceedings. As a result of this process, rates for natural gas

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Outstanding Service Award  

Science Conference Proceedings (OSTI)

The Outstanding Service Award is awarded in even-numbered years to recognize a career of outstanding service to ACM SIGGRAPH by a volunteer. It recognizes an individual who has given extraordinary service to ACM SIGGRAPH, both in the trenches and in ...

2012-08-01T23:59:59.000Z

342

Broadband and universal service  

Science Conference Proceedings (OSTI)

Section 254(b)(3) of the 1996 Telecommunications Act established the objective that residents of rural areas should have access to advanced telecommunications and information services comparable to services in urban areas. Pursuant to the passage of ... Keywords: Broadband policy, Empirical analysis, Rural, Telecommunications policy, Universal service

David Gabel

2007-07-01T23:59:59.000Z

343

Power Plant Cycling Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Plant Cycling Costs Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Subcontract Report NREL/SR-5500-55433 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Prepared under Subcontract No. NFT-1-11325-01

344

INDEPENDENT COST REVIEW (ICR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

345

INDEPENDENT COST REVIEW (ICR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

346

A demonstration of SQLVM: performance isolation in multi-tenant relational database-as-a-service  

Science Conference Proceedings (OSTI)

Sharing resources of a single database server among multiple tenants is common in multi-tenant Database-as-a-Service providers, such as Microsoft SQL Azure. Multi-tenancy enables cost reduction for the cloud service provider which it can pass on as savings ... Keywords: cloud computing, multitenancy, performance isolation, relational database-as-a-service, resource isolation

Vivek Narasayya; Sudipto Das; Manoj Syamala; Surajit Chaudhuri; Feng Li; Hyunjung Park

2013-06-01T23:59:59.000Z

347

Production Cost Optimization Assessments  

Science Conference Proceedings (OSTI)

The benefits of improved thermal performance of coal-fired power plants continue to grow, as the costs of fuel rise and the prospect of a carbon dioxide cap and trade program looms on the horizon. This report summarizes the efforts to date of utilities committed to reducing their heat rate by 1.0% in the Production Cost Optimization (PCO) Project. The process includes benchmarking of plant thermal performance using existing plant data and a site-specific performance appraisal. The appraisal determines po...

2008-12-11T23:59:59.000Z

348

Low Cost, Durable Seal  

SciTech Connect

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

349

Regional comparison of nuclear and fossil electric power generation costs  

SciTech Connect

Nuclear's main disadvantages are its high capital investment cost and uncertainty in schedule compared with alternatives. Nuclear plant costs continue to rise whereas coal plant investment costs are staying relative steady. Based on average experience, nuclear capital investment costs are nearly double those of coal-fired generation plants. The capital investment cost disadvantage of nuclear is balanced by its fuel cost advantages. New base load nuclear power plants were projected to be competitive with coal-fired plants in most regions of the country. Nuclear power costs wre projected to be significantly less (10% or more) than coal-fired power costs in the South Atlantic region. Coal-fired plants were projected to have a significant economic advantage over nuclear plants in the Central and North Central regions. In the remaining seven regions, the levelized cost of power from either option was projected to be within 10%. Uncertainties in future costs of materials, services, and financing affect the relative economics of the nuclear and coal options significantly. 10 figures.

Bowers, H.I.

1984-01-01T23:59:59.000Z

350

Internal Audit Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Internal Audit Services Internal Audit Services Berkeley Lab Internal Audit Services Internal Audit Services Berkeley Lab Contacts Organizational Chart IAS Search Staff Only Lab Search Phone Book A-Z Index Privacy and Security Notice "Internal Auditing is an independent, objective assurance and consulting activity designed to add value and improve an organization's operations. It helps an organization accomplish its objectives by bringing a systematic, disciplined approach to evaluate and improve the effectiveness of risk management, control and governance processes." The Institute of Internal Auditors Standards for the Professional Practice of Internal Auditing About IAS | Audit Committee | Audit Planning | Ethics & Investigations | External Audit Coordination Advisory Services | Other Relevant Audit Links | Contacts | Organizational

351

Long-run marginal costs lower than average costs  

SciTech Connect

The thesis of this article is that the long-run marginal costs of electricity are not always greater than the present average costs, as is often assumed. As long as short-run costs decrease with new plant additions, the long-run marginal cost is less than long-run average cost. When average costs increase with new additions, long-run marginal costs are greater than long-run average costs. The long-run marginal costs of a particular utility may be less than, equal to, or greater than its long-run average costs - even with inflation present. The way to determine which condition holds for a given utility is to estimate costs under various combinations of assumptions: probable load growth, zero load growth, and load growth greater than expected; and changes in load factor with attendant costs. Utilities that can demonstrate long-run marginal costs lower than long-run average costs should be encouraged to build plant and increase load, for the resulting productivity gains and slowing of inflation. Utilities that face long-run marginal costs greater than long-run average costs should discourage growth in sales through any available means.

Hunter, S.R.

1980-01-03T23:59:59.000Z

352

China Information Service Offered  

NLE Websites -- All DOE Office Websites (Extended Search)

China Information Service Offered China Information Service Offered The Energy Analysis Program is proposing to launch a multiclient service, tentatively called the China Energy Information Service, that would draw upon EAP's extensive research on China's energy sector and its strong working relationships with Chinese policymakers and researchers. The service would provide private U.S. firms with the information they need to market their energy-related products, technologies, and services in China. For an annual fee of less than $15,000, participants would be entitled to: Annual updates of EAP's China Databook covering China's energy supply, use, investment, and other related statistics. Bimonthly topical reports on subjects to be chosen in consultation with advisory committees composed of the service's subscribers.

353

Heliostat cost reduction study.  

DOE Green Energy (OSTI)

Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

2007-06-01T23:59:59.000Z

354

Process Equipment Cost Estimation, Final Report  

Office of Scientific and Technical Information (OSTI)

Process Equipment Cost Estimation Process Equipment Cost Estimation Final Report January 2002 H.P. Loh U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 and P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and Jennifer Lyons and Charles W. White, III EG&G Technical Services, Inc. 3604 Collins Ferry Road, Suite 200 Morgantown, WV 26505 DOE/NETL-2002/1169 ii Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus,

355

IEEE TRANSACTIONS ON POWER SYSTEMS,VOL. 5, NO. 3, AUGUST 1990 VALUE OF SERVICE RELIABILITY  

E-Print Network (OSTI)

to various service options or investments in reliability to infer customer outage costs; historical data planning framework, and taking advantage of the recent advances in the quantificationof outage costs of dwindling reserves. Information on customer outage costs associatedwith such actions is incorporatedusing

Gross, George

356

Estimating decommissioning costs: The 1994 YNPS decommissioning cost study  

Science Conference Proceedings (OSTI)

Early this year, Yankee Atomic Electric Company began developing a revised decommissioning cost estimate for the Yankee Nuclear Power Station (YNPS) to provide a basis for detailed decommissioning planning and to reflect slow progress in siting low-level waste (LLW) and spent-nuclear-fuel disposal facilities. The revision also reflects the need to change from a cost estimate that focuses on overall costs to a cost estimate that is sufficiently detailed to implement decommissioning and identify the final cost of decommissioning.

Szymczak, W.J.

1994-12-31T23:59:59.000Z

357

Percent of 2010 Luminaire Cost LED Luminaire Cost  

E-Print Network (OSTI)

LEDs promise to change the world, and few doubt that they will, but a key limiter to more rapid adoption is the cost of the LED themselves. The cost breakdown of LED luminaires vary, but it is safe to put the cost of the LED at around 25% to 40 % of the total luminaire cost. It is projected to remain a significant cost of the total luminaire for many years.

unknown authors

2012-01-01T23:59:59.000Z

358

Realization strategies of dedicated path protection: A bandwidth cost perspective  

Science Conference Proceedings (OSTI)

Communication networks have to provide a high level of availability and instantaneous recovery after failures in order to ensure sufficient survivability for mission-critical services. Currently, dedicated path protection (or 1+1) is implemented in backbone ... Keywords: Cost analysis, Dedicated protection, Network coding, Path protection, Reliability, SRLG

PéTer Babarczi, Gergely BiczóK, Harald ŘVerby, JáNos Tapolcai, PéTer Soproni

2013-06-01T23:59:59.000Z

359

Evaluating Public Transit Benefits and Costs: Best Practices Guidebook |  

Open Energy Info (EERE)

Evaluating Public Transit Benefits and Costs: Best Practices Guidebook Evaluating Public Transit Benefits and Costs: Best Practices Guidebook Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Evaluating Public Transit Benefits and Costs: Best Practices Guidebook Agency/Company /Organization: Victoria Transport Policy Institute User Interface: Other Complexity/Ease of Use: Advanced Website: www.vtpi.org/tranben.pdf Web Application Link: www.vtpi.org/tranben.pdf Cost: Free Language: English Related Tools TransportToolkit Prototype Evaluating Public Transit Benefits and Costs: Best Practices Guidebook Where's the Hydrogen Economy? ... further results Find Another Tool FIND TRANSPORTATION TOOLS This guidebook describes how to create a comprehensive framework for evaluating the full impacts of a particular transit service or improvement.

360

A simulation approach to the evaluation of operational costs and performance in liner shipping operations  

Science Conference Proceedings (OSTI)

This paper presents a simulation model of the operation of a liner shipping network that considers multiple service routes and schedules. The objective is to evaluate the operational costs and performance associated with liner shipping, as well as the ...

Aldo A. McLean; William E. Biles

2008-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Clean Cities Helps Nonprofit Cut Fuel Costs with Propane | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Helps Nonprofit Cut Fuel Costs with Propane Helps Nonprofit Cut Fuel Costs with Propane Clean Cities Helps Nonprofit Cut Fuel Costs with Propane May 15, 2013 - 4:10pm Addthis Mississippi's Community Counseling Services converted 29 vans to run on propane, saving more than $1.50 per gallon on fuel or more than $60,000 a year. | Photo courtesy of Community Counseling Services. Mississippi's Community Counseling Services converted 29 vans to run on propane, saving more than $1.50 per gallon on fuel or more than $60,000 a year. | Photo courtesy of Community Counseling Services. Shannon Brescher Shea Communications Manager, Clean Cities Program What are the key facts? Mississippi's Community Counseling Services converted 29 vans to run on propane, saving more than $1.50 per gallon on fuel or more than $60,000

362

Clean Cities Helps Nonprofit Cut Fuel Costs with Propane | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Cities Helps Nonprofit Cut Fuel Costs with Propane Clean Cities Helps Nonprofit Cut Fuel Costs with Propane Clean Cities Helps Nonprofit Cut Fuel Costs with Propane May 15, 2013 - 4:10pm Addthis Mississippi's Community Counseling Services converted 29 vans to run on propane, saving more than $1.50 per gallon on fuel or more than $60,000 a year. | Photo courtesy of Community Counseling Services. Mississippi's Community Counseling Services converted 29 vans to run on propane, saving more than $1.50 per gallon on fuel or more than $60,000 a year. | Photo courtesy of Community Counseling Services. Shannon Brescher Shea Communications Manager, Clean Cities Program What are the key facts? Mississippi's Community Counseling Services converted 29 vans to run on propane, saving more than $1.50 per gallon on fuel or more than $60,000

363

Effect of changes in DOE pricing policies for enrichment and reprocessing on research reactor fuel cycle costs  

SciTech Connect

Fuel cycle costs with HEU and LEU fuels for the IAEA generic 10 MW reactor are updated to reflect the change in DOE pricing policy for enrichment services as of October 1985 and the published charges for LEU reprocessing services as of February 1986. The net effects are essentially no change in HEU fuel cycle costs and a reduction of about 8 to 10% in the fuel cycle costs for LEU silicide fuel.

Matos, J.E.; Freese, K.E.

1986-11-03T23:59:59.000Z

364

costs | OpenEI  

Open Energy Info (EERE)

7 7 Varnish cache server costs Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (11 months ago) Date Updated March 04th, 2013 (11 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

365

Product Service Codes @ Headquarters | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Product Service Codes @ Headquarters Product Service Codes @ Headquarters A listing of Product Service Codes used at Headquarters Procurement Services Produce Service Codes @...

366

Options and cost for disposal of NORM waste.  

Science Conference Proceedings (OSTI)

Oil field waste containing naturally occurring radioactive material (NORM) is presently disposed of both on the lease site and at off-site commercial disposal facilities. The majority of NORM waste is disposed of through underground injection, most of which presently takes place at a commercial injection facility located in eastern Texas. Several companies offer the service of coming to an operator's site, grinding the NORM waste into a fine particle size, slurrying the waste, and injecting it into the operator's own disposal well. One company is developing a process whereby the radionuclides are dissolved out of the NORM wastes, leaving a nonhazardous oil field waste and a contaminated liquid stream that is injected into the operator's own injection well. Smaller quantities of NORM are disposed of through burial in landfills, encapsulation inside the casing of wells that are being plugged and abandoned, or land spreading. It is difficult to quantify the total cost for disposing of NORM waste. The cost components that must be considered, in addition to the cost of the operation, include analytical costs, transportation costs, container decontamination costs, permitting costs, and long-term liability costs. Current NORM waste disposal costs range from $15/bbl to $420/bbl.

Veil, J. A.

1998-10-22T23:59:59.000Z

367

Cost Study Manual | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cost Study Manual Cost Study Manual Update 62912. Memo regarding Cost Study Manual Cost Study Manual More Documents & Publications Technical Standards, Newsletter-June 1999 Build...

368

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network (OSTI)

E. Hydrogen Supply: Cost Estimate for Hydrogen Pathways -costs are compared with cost estimates of similar stationsHydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

369

Geothermal probabilistic cost study  

DOE Green Energy (OSTI)

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

1981-08-01T23:59:59.000Z

370

National Service Activation Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Service Activation Checklist Service Activation Checklist You have just received information that you are being activated for national service. Covered or Not Covered If you have received notice to report for active duty - Army, Navy, Marines, Air Force, National Guard, Public Health Service, or Coast Guard and you are a Federal employee, you have employment and reemployment rights under the Uniformed Services Employment and Reemployment Act of 1994 (USERRA). Basics - Telling People What is Happening 1. Have you told your spouse, family, best friend, or someone else who is important to you? Point of Contact for Department of Energy Use: Name: Telephone Number: E-mail: 2. Go to Employee Self-Service and make sure your personal information is up to date.

371

Distributed service composition  

E-Print Network (OSTI)

In this paper we explore the use of action systems for distributed service composition. Distributed systems can be composed out of a basic computation and a set of services. Even though this way of designing a system out of components helps in managing the derivation task, formal description techniques are needed due to the complexity of distributed systems. We propose a method where services, or features as they are often called, are speci ed in isolation by the service provider. The services when available are used by clients in a distributed manner. Reasoning about the services and their interactions with each other and with the basic computation of the clients is carried out within the re nement calculus. To exemplify the proposed methodology we study feature composition and feature interaction in telecommunications software.

Joost N. Kok; Kaisa Sere

1999-01-01T23:59:59.000Z

372

Consumer thermal energy storage costs for residential hot water, space heating and space cooling systems  

DOE Green Energy (OSTI)

The cost of household thermal energy storage (TES) in four utility service areas that are representative for hot water, space heating, and space cooling systems in the United States is presented. There are two major sections of the report: Section 2.0 is a technology characterization of commercially available and developmental/conceptual TES systems; Section 3.0 is an evaluation of the consumer cost of the three TES systems based on typical designs in four utility service areas.

None

1976-11-30T23:59:59.000Z

373

Technology Partnerships Are Yielding Reliable, Cost-Saving Appliances |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partnerships Are Yielding Reliable, Cost-Saving Partnerships Are Yielding Reliable, Cost-Saving Appliances Technology Partnerships Are Yielding Reliable, Cost-Saving Appliances November 9, 2011 - 12:01pm Addthis Oak Ridge National Laboratory's facility tests several water heaters at one time. Because of ORNL's accelerated durability testing, they estimate that 10 months of constant operation in its testing facility is comparable to 10 years of service life in a typical residential setting. | Photo courtesy of the Building Technologies Research and Integration Center, ORNL Oak Ridge National Laboratory's facility tests several water heaters at one time. Because of ORNL's accelerated durability testing, they estimate that 10 months of constant operation in its testing facility is comparable to 10 years of service life in a typical residential setting. | Photo courtesy of

374

APS team works smarter, cuts substation construction costs by 36%  

SciTech Connect

An aggressive, cost-cutting, team of T D employees at Arizona Public Service Co (APS) is building a new distribution substation in Phoenix for less than half the original cost that APS planners had calculated for the project's land, labor and materials. Scheduled for service in June of this year, APS analysts had originally projected land, labor and materials costs for the 20-MVA Bell substation at nearly $1.7-million-not including major equipment such as transformers, circuit breakers, and switches. However, after studying the project, an empowered APS crew was able to slash 36% off the original estimate-more than $610,000. What's more, APS spokesmen say that its new approach to substation construction and design has given its engineers and construction crews a laundry list of additional ideas to try out on future substation ventures. 4 figs., 1 tab.

Not Available

1993-05-01T23:59:59.000Z

375

Berkeley Lab: Special Bus/Shuttle Service Reservations  

NLE Websites -- All DOE Office Websites (Extended Search)

Special Service Special Service Buses and/or Vans are available for special service by reservation. Costs are: $136.50 required 2 hour minimum $68.25 per vehicle each additional hour Bus image Bus image Buses accommodate: 41 passengers (26 Seated plus 15 Standing) (and up to 2 wheelchair passengers) Vans accommodate: 15 passengers To arrange special service shuttle transportation: Fill out the request form below A valid project id is required for special service requests Complete the form and click on the "send" button The request for special bus service will be sent to busservices@lbl.gov and reviewed. A confirmation will be sent back via email to the requestor regarding the status. For additional information contact: Kori Porter at 486-5112 or email busservices@lbl.gov.

376

DOE Awards Hanford Site Occupational Medical Services Contract | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Occupational Medical Services Contract Occupational Medical Services Contract DOE Awards Hanford Site Occupational Medical Services Contract June 8, 2012 - 12:00pm Addthis Media Contact Cameron Hardy 509-308-4947 Cameron.hardy@rl.gov Cincinnati - The U.S. Department of Energy (DOE) announced today that HPM Corporation, of Kennewick, Washington has been awarded an estimated $99 million contract to provide Occupational Medical Services at the DOE Hanford Site. HPM is a certified minority-owned, women-owned small business. This is a two-year hybrid contract with four-one-year option periods that includes firm-fixed price with award fee, cost reimbursement, and Indefinite Delivery Indefinite Quantity (IDIQ) components. As the Occupational Medical Services Contractor, HPM Corporation will: Provide occupational medical services to approximately 8,000

377

A Look at Food Service Buildings - Index Page  

U.S. Energy Information Administration (EIA) Indexed Site

Food Service Food Service Home: A Look at CBECS Building Activities How large are they? How many employees are there? Where are they located? How old are they? Who owns and occupies them? How do they use energy and how much does it cost? How do they use electricity? How do they use natural gas? What types of equipment do they use? How do they measure up on conservation efforts? Summary Comparison Table (All Activities) FOOD SERVICE BUILDINGS There were an estimated 285,000 food service buildings in the U.S. in 1995. Number of Buildings In the Commercial Buildings Energy Consumption Survey (CBECS), food service buildings are those used for the preparation and sale of food and beverages for consumption; they include buildings such as fast food establishments, full service restaurants, caterers, cafeterias, diners, and bars.

378

@ SOUTHWEST FOREST SERVICE  

E-Print Network (OSTI)

. kangley Terrell D. Smith Ralph C. Hall USDA F~rgstService Resea~chNote PSW-256 1971 acquired for the Redw

Standiford, Richard B.

379

Software Services: About  

NLE Websites -- All DOE Office Websites (Extended Search)

About About MISSION The APS Software Services Group provides flexible, customer-oriented software services to the accelerator and beamlines in support of world-class photon science at the APS. These services are rendered through the application of our core competencies: embedded software, software engineering, distributed control systems, information systems, high performance computing, and graphical user interfaces. Our mission is to maintain cutting edge skills and technology in these competencies, apply them to meet or exceed the requirements of the accelerator and beamline projects at hand, and provide responsive, efficient support of established systems. Projects shall be conducted in a transparent, well-documented manner to enable the prioritization of our services

380

Services | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Services Services Services The Office of Policy and International Affairs supports the Secretary of Energy and other departmental elements with a range of expertise on domestic and international energy matters. Among other areas, PI experts maintain extensive knowledge of the following issues: International Affairs regional and country-specific energy policies and practices, technology developments, and market conditions encompassing Africa, Asia, Europe, Eurasia, Russia, the Middle East, and the Western Hemisphere bilateral and multilateral energy treaties and obligations international cooperation in science and technology regional and country-specific barriers to energy markets and services trade and investment trends in the global energy economy international energy partnerships, commitments, and agreements

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Services, and Meetings and  

E-Print Network (OSTI)

organizes outstanding events and important information of the year into program departments, administrative services, and the AOCS Foundation. The four major program departments are

unknown authors

2000-01-01T23:59:59.000Z

382

TMS 2010 Exhibitor Services  

Science Conference Proceedings (OSTI)

View exhibitor benefits and information, and reserve booth space. ... Lead Retrieval services for annual meeting and exhibition are available through Experient.

383

Products, Services: Not Procurable  

NLE Websites -- All DOE Office Websites (Extended Search)

Products, Services: Not Procurable As a premier national research and development laboratory, LANL seeks to do business with qualified companies that offer value and high...

384

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates and Repayment Services Consolidated Rate Schedules FY 2014 Rates BCP Annual Rate Process Central Arizona Project Transmission Rate Process DSW Multiple System Transmission...

385

Service/Product Provider  

NLE Websites -- All DOE Office Websites (Extended Search)

GA 30068 Toledo, OH 43659 Business: Energy Process Mngnt Solutions Business: Insulation, Composites, Roofing Mtrls Pat Golden, Dir. Industrial Field Services Fred...

386

Electric power transmission and distribution systems: costs and their allocation. Research report  

SciTech Connect

Transmission and distribution costs contribute significantly to the total costs of providing electrical service. The costs derived from the transmission and distribution (TandD) system have historically comprised about 2/3 the costs of producing and delivering electricity to residential-commercial customers, and over 1/3 the total costs supplying electricity to large industrial customers. This report: (1) estimates the differences in transmission and distribution equipment required to serve industrial and residential-commercial customers and allocates to the above two customer classes the average costs of installing this equipment; (2) estimates the costs of operation and maintenance of the transmission and distribution system, and allocates these costs to the customer classes; and (3) calculates the TandD derived average costs for the two customer classes. (GRA)

Baughman, M.L.; Bottaro, D.J.

1975-07-01T23:59:59.000Z

387

Concentrating Solar Power Services CSP Services | Open Energy Information  

Open Energy Info (EERE)

Concentrating Solar Power Services CSP Services Concentrating Solar Power Services CSP Services Jump to: navigation, search Name Concentrating Solar Power Services (CSP Services) Place Cologne, Germany Zip D-51143 Sector Solar Product A spin-out of the DLR Institute of Technical Thermodynamics, providing consulting, due diligence and component testing for Solar Thermal Electricity Generation (STEG). References Concentrating Solar Power Services (CSP Services)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Concentrating Solar Power Services (CSP Services) is a company located in Cologne, Germany . References ↑ "Concentrating Solar Power Services (CSP Services)" Retrieved from "http://en.openei.org/w/index.php?title=Concentrating_Solar_Power_Services_CSP_Services&oldid=343830

388

Pennsylvania life cycle costing manual  

SciTech Connect

Until the 1970s, it was commonplace for institutions and governments to purchase equipment based on lowest initial (first) costs. Recurring costs such as operational, maintenance, and energy costs often were not considered in the purchase decision. If an agency wanted to buy something, it published specifications and requested bids from several manufacturers. Often, the lowest bidder who met the specifications won the job, with no consideration given to the economic life of the equipment or yearly recurring costs such as energy and maintenance costs. The practice of purchasing based on lowest initial costs probably did not make good economic sense prior to 1970, and it certainly does not make good sense now. The wise person will consider all costs and benefits associated with a purchase, both initial and post-purchase, in order to make procurement decisions that are valid for the life of the equipment. This describes a method of financial analysis that considers all pertinent costs: life cycle costing (LCC).

1996-02-01T23:59:59.000Z

389

LIFE Cost of Electricity, Capital and Operating Costs  

Science Conference Proceedings (OSTI)

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

Anklam, T

2011-04-14T23:59:59.000Z

390

Cost-sensitive classifier evaluation using cost curves  

Science Conference Proceedings (OSTI)

The evaluation of classifier performance in a cost-sensitive setting is straightforward if the operating conditions (misclassification costs and class distributions) are fixed and known. When this is not the case, evaluation requires a method of visualizing ...

Robert C. Holte; Chris Drummond

2008-05-01T23:59:59.000Z

391

Utility Energy Service Contract Case Studies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Case Studies Case Studies Utility Energy Service Contract Case Studies October 7, 2013 - 3:25pm Addthis These case studies feature examples of successful projects that involved utility energy service contracts (UESC). Coast Guard Multi-Site UESC Project: Twelve-site project with 21 energy-conservation measures reduced electricity consumption by 19.1%, water consumption by 64.2%, and natural gas consumption by 21.1%. National Institute of Health: Saved at least $5 million in annual energy costs at its main campus in Bethesda, Maryland, through energy conservation measures. General Services Administration Ted Weiss Federal Building: Multiple energy conservation measures and utility services saved $256,000 in annual energy costs and 64,872 Btu per gross square foot. Patrick Air Force Base: Base-wide energy program implemented to exceed

392

Cost Sensitive Conditional Planning  

E-Print Network (OSTI)

While POMDPs provide a general platform for conditional planning under a wide range of quality metrics they have limited scalability. On the other hand, uniform probability conditional planners scale very well, but many lack the ability to optimize plan quality metrics. We present an innovation to planning graph based heuristics that helps uniform probability conditional planners both scale and generate high quality plans when using actions with non uniform costs. We make empirical comparisons with two state of the art planners to show the benefit of our techniques.

Daniel Bryce; Subbarao Kambhampati

2005-01-01T23:59:59.000Z

393

Wellness, Health & Counseling Services  

E-Print Network (OSTI)

Wellness, Health & Counseling Services Dr. Marcelle Holmes Assistant Vice Chancellor CARE Career Student Health Center #12;The mission of the Wellness, Health & Counseling Services cluster is to support · Dedicated to promoting principles of wellness, prevention and healthy life-style choices for students

Stanford, Kyle

394

UTILITY SERVICE CONNECTION APPLICATION  

E-Print Network (OSTI)

, and DISTRICT HEATING Part 3 (a). Water Distribution. Water service to meet requirements of UBC Technical.5.6). #12;Page 2 of 2 Revised 16 Nov 2011 Part 3 (c). Gas and District Heating · Service to meet (%) District Heating Telephone Contractor or UBC Dept Fax Contractor Primary Contact Email Telephone Design

Vellend, Mark

395

University Services Facilities Management  

E-Print Network (OSTI)

Loughlin is the practice area leader for Network Automation and Analytics with the IBM Global Business Services, Energy by leveraging all of the benefits of automation and digitization. Mark Welch and Kieran McLoughlin, IBM Global Business Services www.UtilitiesProject.com/10744 CHAPTER are being made by utilities in automation, remote

Weiblen, George D

396

Corporate Information & Computing Services  

E-Print Network (OSTI)

Corporate Information & Computing Services High Performance Computing Report March 2008 Author The University of Sheffield's High Performance Computing (HPC) facility is provided by CiCS. It consists of both Graduate Students and Staff. #12;Corporate Information & Computing Services High Performance Computing

Martin, Stephen John

397

Contracting for Collaborative Services  

Science Conference Proceedings (OSTI)

In this paper, we analyze the contracting issues that arise in collaborative services, such as consulting, financial planning, and information technology outsourcing. In particular, we investigate how the choice of contract type---among fixed-fee, time-and-materials, ... Keywords: consulting, contracting, joint production, principal/agent models, services

Guillaume Roels; Uday S. Karmarkar; Scott Carr

2010-05-01T23:59:59.000Z

398

Service/Product Provider  

NLE Websites -- All DOE Office Websites (Extended Search)

conditions without any upfront costs for Ford. Project Scope PSI eliminated steam boilers and old HVAC units by using unique equipment technologies and control logic. Project...

399

Service/Product Provider  

NLE Websites -- All DOE Office Websites (Extended Search)

integrated facility assessments at Honeywell. Most recently, they have proposed a cogeneration plant with other steam system reliability improvements to reduce the cost of steam...

400

Energy Services: A Status Report  

Science Conference Proceedings (OSTI)

This report is designed to assist EPRI members in identifying new services to attract customers and retain or expand market share. It describes the services most commonly offered in the market and the successful features of those services. Indications also are given of the percentage of companies promoting particular services and the rate of growth or decline in the services. In addition, innovative services or variations on services are described. Where possible, analysis is provided to indicate why ser...

2001-12-06T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Automatic service deployment using virtualisation  

E-Print Network (OSTI)

Manual deployment of the application usually requires expertise both about the underlying system and the application. Automatic service deployment can improve deployment significantly by using on-demand deployment and selfhealing services. To support these features this paper describes an extension the Globus Workspace Service [10]. This extension includes creating virtual appliances for Grid services, service deployment from a repository, and influencing the service schedules by altering execution planning services, candidate set generators or information systems. 1 2 1.

Gabor Kecskemeti; Peter Kacsuk; Gabor Terstyanszky; Tamas Kiss; Thierry Delaitre

2008-01-01T23:59:59.000Z

402

An Energy Services Initiative  

E-Print Network (OSTI)

The parent company of a large electric utility has launched a new unregulated subsidiary that provides a portfolio of value-added, beyond-the-meter energy services. These services are designed to meet the specific needs of customers and to better position the company to meet the challenges of a more competitive operating environment. The energy services initiative integrates a variety of hardware-based solutions to meet a customer's energy management, high voltage distribution, information, and power quality needs. The subsidiary will continually search the horizon for emerging technologies to enhance its ability to deliver comprehensive and customized energy solutions. The approach to marketing these services supplements the electric utility's core competencies with services and expertise provided by trade allies and performance partners.

Beasley, R. C.; Tipton, J. K.; Ehmer, R. C.

1996-04-01T23:59:59.000Z

403

An Interdisciplinary Perspective on IT Services Management and Service Science  

Science Conference Proceedings (OSTI)

The increasing importance of information technology (IT) services in the global economy prompts researchers in the field of information systems (IS) to give special attention to the foundations of managerial and technical knowledge in this emerging arena ... Keywords: Cloud Computing, Economics, Is, It Services, Literature Survey, Marketing, Operations, Research Directions, Service Science, Services Management, Services-Oriented Systems, System Science

Indranil Bardhan; Haluk Demirkan; P. Kannan; Robert Kauffman; Ryan Sougstad

2010-04-01T23:59:59.000Z

404

MasteringWeb Services Security MasteringWeb Services Security  

E-Print Network (OSTI)

Preview of MasteringWeb Services Security Preview of MasteringWeb Services Security Konstantin introduction Highlights of the book Web Services security problem XML Security WS-Security Security mechanisms for ASP.NET Web Services Planning and building secure Web Service systems ­ Architectural and policy

405

Research Note---Online Users' Switching Costs: Their Nature and Formation  

Science Conference Proceedings (OSTI)

The highly competitive and rapidly changing market for online services is becoming increasingly effective at locking users in through the coercive effects of switching costs. Although the information systems field increasingly recognizes that switching ... Keywords: online consumer behavior, partial least squares, structural equation modeling, survey data, switching costs

Soumya Ray; Sung S. Kim; James G. Morris

2012-03-01T23:59:59.000Z

406

VMFlow: leveraging VM mobility to reduce network power costs in data centers  

Science Conference Proceedings (OSTI)

Networking costs play an important role in the overall costs of a modern data center. Network power, for example, has been estimated at 10-20% of the overall data center power consumption. Traditional power saving techniques in data centers focus on ... Keywords: VM placement, energy and power management, green networking, networking aspects in cloud services

Vijay Mann; Avinash Kumar; Partha Dutta; Shivkumar Kalyanaraman

2011-05-01T23:59:59.000Z

407

Cost effective multimedia courseware development  

Science Conference Proceedings (OSTI)

Multimedia technology offers considerable potential for education though the costs of production of courseware are prohibitive especially in a rapidly changing discipline such as computer science. This paper proposes a cost-effective technique which ...

C. J. Pilgrim; Y. K. Leung; D. D. Grant

1997-06-01T23:59:59.000Z

408

Overview and Low Cost Processing  

Science Conference Proceedings (OSTI)

Mar 4, 2013 ... The major reason that there is not more widespread use of titanium and its alloys is the high cost. Developments in reducing the cost of titanium ...

409

Cost and Impacts of Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

and Policies RESULTS 2010-2025 and long-run impacts 2010-2025 GovernmentIndustry Costs Hydrogen production, infrastructure & cost HyTrans merges the early transition...

410

User cost in oil production  

E-Print Network (OSTI)

The assumption of an initial fixed mineral stock is superfluous and wrong. User cost (resource rent) in mineral production is the present value of expected increases in development cost. It can be measured as the difference ...

Adelman, Morris Albert

1990-01-01T23:59:59.000Z

411

Cost-sensitive classifier evaluation  

Science Conference Proceedings (OSTI)

Evaluating classifier performance in a cost-sensitive setting is straightforward if the operating conditions (misclassification costs and class distributions) are fixed and known. When this is not the case, evaluation requires a method of visualizing ...

Robert C. Holte; Chris Drummond

2005-08-01T23:59:59.000Z

412

Wind Integration Cost and Cost-Causation: Preprint  

DOE Green Energy (OSTI)

The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

2013-10-01T23:59:59.000Z

413

3800 Green Series Cost Elements  

Energy.gov (U.S. Department of Energy (DOE))

Stoller - Legacy ManagementSustainable Acquisition (formerly EPP) Program 3800 Series Cost Elements01/30/2012 (Rev. 4)

414

Empirical Methods of Cost Estimation  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

415

Bifacial Efficiency at Monofacial Cost  

solar cells; photovoltaics; PV; bifacial efficiency; Monofacial Cost, Bifacial Cells; bifacial Modules; industry growth forum; gamma solar Created ...

416

Essays on Service Innovation  

E-Print Network (OSTI)

As economies are increasingly driven by services, the introduction of new services to satisfy customers and improve firm value is becoming a critical issue for managers. In my dissertation, I take a step in improving the understanding of service innovations. In the first essay, I look at the determinants of the number of service innovations introduced by a firm and their interrelationship with customer satisfaction and firm value. Furthermore, I look how these interrelationships vary between Internet-Enabled Service Innovations (IESIs) and Non-Internet-Enabled Service Innovations (NIESIs). I develop a system of equations that link service innovation, customer satisfaction and firm value. I model the determinants of service innovations, using a zero-inflated Poisson model. I estimate the model on a panel data set that I assembled across multiple industries from multiple data sources such as the American Customer Satisfaction Index, Compustat, SDC Platinum, and LexisNexis. My results reveal that IESIs are more strongly influenced by financial resources of the firm and by market growth than are NIESIs. Surprisingly, neither IESIs nor NIESIs have a significant direct effect on customer satisfaction. However, IESIs have a positive and significant effect on firm value. Given the differences between consumer markets and business markets, it is important to understand better the determinants and outcomes of business-to-business service innovations (B2B-SIs). In my second essay, I empirically address this issue. I develop a modeling system that relates service innovation to firm value. I estimate my model on unique panel data of service innovations. Results indicate that B2B-SIs have positive effects on firm value. Furthermore, I find that the number of B2B-SIs introduced by a firm is primarily determined by firm-level factors rather than marketlevel factors Overall, I find that regardless of firm type or market type, the number of service innovations introduced by a firm has a substantial impact on firm value. In particular, IESIs and B2B-SIs increase firm value. In addition, the two essays also show that liquid financial resources are important determinants of service innovations. This is especially true for IESIs and B2B-SIs.

Dotzel, Thomas

2009-08-01T23:59:59.000Z

417

Cutting Industrial Solar System Costs in Half  

E-Print Network (OSTI)

While there are technical, social, environmental and institutional barriers to the widespread use of solar systems, the principle barrier is economic. For commercial and industrial firms to turn to this alternate energy source, the first cost must be sharply reduced so that the annual savings that are achievable will provide an attractive return on the incremental investment. This paper discusses one proven method of combining the energy efficiency of high temperature industrial heat pumps with solar collectors that result in an installed first cost that approximates one half of that of conventional solar systems. This technology is now available for producing up to 220 F hot water for industrial process heat, space heating, and service hot water heating. The basic principles of the technology are reviewed, including the typical operating characteristics of the industrial heat pumps and the solar collectors, plus the generic application schematics comparing this approach with conventional solar collector only systems. Several case histories are reviewed, including an industrial plant, townhouse project, and hospital. Not only is a lower first cost demonstrated, but the combination uses small solar arrays, ideal where roof area is limited, and use less expensive solar collectors.

Niess, R. C.; Weinstein, A.

1982-01-01T23:59:59.000Z

418

COST SHARING ON SPONSORED PROJECTS  

E-Print Network (OSTI)

COST SHARING ON SPONSORED PROJECTS 1 California Institute of Technology Issuing Authority: Office is that portion of the total cost of an externally funded project that is not funded by the sponsor. Depending as a demonstration of its commitment to the project. When voluntary cost sharing is included in the proposal budget

Tai, Yu-Chong

419

Berkeley Lab Directory Services: Offsite Directory Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Offsite Directories Offsite Directories Directories for Organizations Related to the Lab Berkeley Lab Directory Services DOE Labs and Sites DOE National Telephone Directory EPA ESnet Contacts Federal Telephone Directories Lawrence Livermore National Laboratory National Institute of Standards and Technology (NIST) National Institutes of Health (NIH) Directory National Science Foundation (NSF) SLAC Directories, Including High Energy Physics (HEP Names) UC Berkeley Directory (all current faculty, staff, and students) University of California Campuses and Offices General Online Directories AT&T directory services All-In-One HotBot Internet Address Finder WhoWhere? People Search Yellowbook Yahoo People Search International Country Codes for Email Addresses Official USPS Abbreviations (States, Street Suffixes, Secondary Unit

420

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering  

E-Print Network (OSTI)

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering The IMS System Maintenance Review offering is a special service offering from the IMS laboratory Technical Specialist group. Complex IMS systems require periodic maintenance, coupled with a specific testing process

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Dynamic service placement in shared service hosting infrastructures  

Science Conference Proceedings (OSTI)

Large-scale shared service hosting environments, such as content delivery networks and cloud computing, have gained much popularity in recent years. A key challenge faced by service owners in these environments is to determine the locations where service ...

Qi Zhang; Jin Xiao; Eren Gürses; Martin Karsten; Raouf Boutaba

2010-05-01T23:59:59.000Z

422

DOE Honors WIPP Representative for Cutting Travel Costs, Greenhouse Gas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP Representative for Cutting Travel Costs, Greenhouse WIPP Representative for Cutting Travel Costs, Greenhouse Gas Emissions DOE Honors WIPP Representative for Cutting Travel Costs, Greenhouse Gas Emissions June 1, 2012 - 12:00pm Addthis Secretary Chu presents the Secretary of Energy's Appreciation Award to Judy A. McLemore. Secretary Chu presents the Secretary of Energy's Appreciation Award to Judy A. McLemore. WASHINGTON, D.C. - A representative of the Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M., on Tuesday received the Secretary of Energy's Appreciation Award for her efforts to improve sustainability and reduce travel costs and the number of fleet vehicles. Judy A. McLemore, who works for URS Regulatory and Environmental Services, based in Carlsbad, was honored for helping advance DOE's management and

423

SunShot Initiative: Low-Cost Heliostat Development  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost Heliostat Development Cost Heliostat Development HiTek logo Photo of a machine with two round discs connected by intertwined chains. A staged-chain drive unit eliminates destructive coupling loads from severe wind conditions and greatly reduces cumulative fatigue damage. HiTek Services, under the Baseload CSP FOA, is conducting fundamental parametric analyses of the optimum heliostat size and developing a novel low-cost heliostat design. Approach There are four tasks under this award: Develop a means to determine the optimum size range of the heliostat, in terms of the applied forces and moments, manufacturing learning curve effects, O&M, and optical efficiency. The outcome of this task will be a spreadsheet analysis tool for parametrically determining heliostat costs that are appropriately allocated into categories with inputs for a specific design.

424

Modified Accelerated Cost-Recovery System (MACRS) + Bonus Depreciation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modified Accelerated Cost-Recovery System (MACRS) + Bonus Modified Accelerated Cost-Recovery System (MACRS) + Bonus Depreciation (2008-2012) Modified Accelerated Cost-Recovery System (MACRS) + Bonus Depreciation (2008-2012) < Back Eligibility Agricultural Commercial Industrial Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Water Solar Heating & Cooling Heating Water Heating Program Info Start Date 1986 Program Type Corporate Depreciation Provider U.S. Internal Revenue Service Under the federal Modified Accelerated Cost-Recovery System (MACRS), businesses may recover investments in certain property through depreciation deductions. The MACRS establishes a set of class lives for various types of property, ranging from three to 50 years, over which the property may be

425

Federal Energy Management Program: Energy and Cost Savings Calculators for  

NLE Websites -- All DOE Office Websites (Extended Search)

and Cost Savings Calculators for Energy-Efficient Products and Cost Savings Calculators for Energy-Efficient Products The energy and cost calculators below allow Federal agencies to enter their own input values (such as utility rates, hours of use) to estimate energy and cost savings for energy-efficient products. Some are Web-based tools; others are Excel spreadsheets provided by ENERGY STAR® for download. Lighting Compact Fluorescent Lamps Exit Signs Commercial and Industrial Equipment Commercial Unitary Air Conditioners Air-Cooled Chillers Commercial Heat Pumps Boilers Food Service Equipment Dishwashers Freezers Fryers Griddles Hot Food Holding Cabinets Ovens Refrigerators Steam Cookers Ice Machines Office Equipment Computers, Monitors, and Imaging Equipment Appliances Dishwashers Clothes Washers Residential Equipment Central Air Conditioners

426

Cost comparison between private and public collection of residual household waste: Multiple case studies in the Flemish region of Belgium  

SciTech Connect

Highlights: Black-Right-Pointing-Pointer The goal is to compare collection costs for residual household waste. Black-Right-Pointing-Pointer We have clustered all municipalities in order to find mutual comparable pairs. Black-Right-Pointing-Pointer Each pair consists of one private and one public operating waste collection program. Black-Right-Pointing-Pointer All cases show that private service has lower costs than public service. Black-Right-Pointing-Pointer Municipalities were contacted to identify the deeper causes for the waste management program. - Abstract: The rising pressure in terms of cost efficiency on public services pushes governments to transfer part of those services to the private sector. A trend towards more privatizing can be noticed in the collection of municipal household waste. This paper reports the findings of a research project aiming to compare the cost between the service of private and public collection of residual household waste. Multiple case studies of municipalities about the Flemish region of Belgium were conducted. Data concerning the year 2009 were gathered through in-depth interviews in 2010. In total 12 municipalities were investigated, divided into three mutual comparable pairs with a weekly and three mutual comparable pairs with a fortnightly residual waste collection. The results give a rough indication that in all cases the cost of private service is lower than public service in the collection of household waste. Albeit that there is an interest in establishing whether there are differences in the costs and service levels between public and private waste collection services, there are clear difficulties in establishing comparisons that can be made without having to rely on a large number of assumptions and corrections. However, given the cost difference, it remains the responsibility of the municipalities to decide upon the service they offer their citizens, regardless the cost efficiency: public or private.

Jacobsen, R., E-mail: ray.jacobsen@ugent.be [Department of Agricultural Economics, Ghent University, Coupure Links 653, B-9000 Ghent (Belgium); Buysse, J., E-mail: j.buysse@ugent.be [Department of Agricultural Economics, Ghent University, Coupure Links 653, B-9000 Ghent (Belgium); Gellynck, X., E-mail: xavier.gellynck@ugent.be [Department of Agricultural Economics, Ghent University, Coupure Links 653, B-9000 Ghent (Belgium)

2013-01-15T23:59:59.000Z

427

Capping the electricity cost of cloud-scale data centers with impacts on power markets  

E-Print Network (OSTI)

In this paper, we propose a novel electricity cost capping algorithm that not only minimizes the electricity cost of operating cloud-scale data centers, but also enforces a cost budget on the monthly electricity bill. Our solution first explicitly models the impacts of power demands on electricity prices and the power consumption of cooling and networking in the minimization of electricity cost. In the second step, if the electricity cost exceeds a desired monthly budget due to unexpectedly high workloads, our solution guarantees the quality of service for premium customers and trades off the request throughput of ordinary customers. We formulate electricity cost capping as two related constrained optimization problems and propose an efficient algorithm based on mixed integer programming. Simulation results show that our solution outperforms the state-ofthe-art solutions by having lower electricity costs and achieves desired cost capping with maximized request throughput.

Yanwei Zhang; Yefu Wang; Xiaorui Wang

2011-01-01T23:59:59.000Z

428

New York Power Authority - Energy Services Programs for Public Entities |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Authority - Energy Services Programs for Public Power Authority - Energy Services Programs for Public Entities New York Power Authority - Energy Services Programs for Public Entities < Back Eligibility Institutional Local Government Schools Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Manufacturing Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Bioenergy Solar Buying & Making Electricity Water Heating Program Info State New York Program Type State Rebate Program Rebate Amount Not Specified Provider New York Power Authority New York Power Authority (NYPA) provides energy efficiency improvements to eligible public sector organizations at no up-front cost. A range of energy

429

Environment/Health/Safety (EHS): Health Services: Clinical Services...  

NLE Websites -- All DOE Office Websites (Extended Search)

Clinical Services: Occupational Health Mission Statement In support of the pursuit of world class science at the Berkeley Laboratory, Health Services promotes the highest level of...

430

17.2 - Cost Participation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17.2 (June 2004) 17.2 (June 2004) 1 Cost Participation [Reference: FAR 35.003(b), DEAR 917.70] Overview This section discusses DOE treatment of cost participation by organizations performing research, development, and demonstration projects under DOE prime contracts. This section does not cover efforts and projects performed for DOE by other Federal agencies. Background Cost participation is a generic term denoting any situation where the Government does not fully reimburse the contractor for all allowable costs necessary to accomplish the project or effort under the contract. The term includes, but is not limited to: * Cost Sharing * Cost Matching * Cost Limitation, which may be direct or indirect * Participation in-kind

431

Realistic costs of carbon capture  

Science Conference Proceedings (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

432

Staff Services | Brookhaven National Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Our mission is to provide services that support and assist the world-class Our mission is to provide services that support and assist the world-class scientific research performed at Brookhaven National Laboratory. Our services are available to all Brookhaven Departments, Divisions, guests, users, and visiting researchers. The Staff Services office is located in Building 400, 20 Brookhaven Avenue. Get maps and directions. Food Services food services Food services are an integral part of life at BNL. We offer an on-site cafeteria, full service restaurant, a cafe serving Starbuck's coffee and vending machines. Housing Services housing services BNL attracts more than 4,500 visiting scientists from all over the world each year. To support our guests, 333 on-site housing units are available for rent. Mail Services mail services The BNL Mail Room handles all official U.S. mail, through our on-site U.S.

433

Data Integration Using Web Services  

Science Conference Proceedings (OSTI)

In this paper we examine the opportunities for data integration in the context of the emerging Web Services systems development paradigm. The paper introduces the programming standards associated with Web Services and provides an example of how Web Services ...

Mark Hansen; Stuart E. Madnick; Michael Siegel

2003-01-01T23:59:59.000Z

434

Versioning of Web service interfaces  

E-Print Network (OSTI)

This thesis investigates the problem of "design for change" in the context of Web Service based information systems. It describes the current status of architecting Web Services, an implementation of the Service Oriented ...

Agarwal, Anamika, 1981-

2004-01-01T23:59:59.000Z

435

GUIDE TO NUCLEAR POWER COST EVALUATION. VOLUME 4. FUEL CYCLE COSTS  

SciTech Connect

Information on fuel cycle cost is presented. Topics covered include: nuclear fuel, fuel management, fuel cost, fissionable material cost, use charge, conversion and fabrication costs, processing cost, and shipping cost. (M.C.G.)

1962-03-15T23:59:59.000Z

436

Services | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Services Services Services SERVICES OF THE OFFICE OF THE GENERAL COUNSEL The Office of the General Counsel is responsible for providing legal advice, counsel, and support to the Secretary, Deputy Secretary, and all Departmental elements, except the National Nuclear Security Administration and the Federal Energy Regulatory Commission. This Office assures that the Department operates in compliance with all pertinent laws and regulations. The Immediate Office of the General Counsel directs, manages, and supervises all activities assigned to the General Counsel, including the following offices: Litigation & Enforcement (GC-30) The Deputy General Counsel for Litigation and Enforcement directs, manages, supervises and coordinates the activities and functions assigned to the following Assistant General Counsels responsible for:

437

ORISE: Health physics services  

NLE Websites -- All DOE Office Websites (Extended Search)

Health physics services Health physics services Nuclear power plant The Oak Ridge Institute for Science and Education (ORISE) offers comprehensive health physics services in a number of technical areas for the U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC), as well as other federal and state agencies. From radiological facility audits and reviews to dose modeling and technical evaluations, ORISE is nationally-recognized for its health physics support to decontamination and decommissioning (D&D) projects across the United States. Our health physics services include: Environmental survey Applied health physics projects We work with government agencies and organizations to identify, measure and assess the presence of radiological materials during the D&D process. ORISE

438

CROSS-SERVICING AGREEMENT  

NLE Websites -- All DOE Office Websites (Extended Search)

CROSS-SERVICING AGREEMENT CROSS-SERVICING AGREEMENT PLWOSE: This agreement establishes the terms under which GSA Flcct Management will p m e m and pay for the specified goods and/or services from another government agcncy: (Check Block(s) Which ~ p p l y ) , [ X 1 Category I - Scheduled Repairs- Per Job Labor Schedule ( f a t rate charge) [ X ] Category I I - Unschcduled Repairs- Rate Per Hour Name and Address of Supplying Activity: BWXT Pantcx, LLC. P. 0. BOX 30020 Amarillo. Texas 79 120-0020 - Effective Date: [ X ] Category I l l - Servicing & Dispensing of Petroleum Products ~.d-'@- Terminate Date (Effective until canccled by either agcncy) 30-DAY WRIITEN NOTICE [ 1 PAC o r [ X ] Non-IPAC (Attachm'mt A) BILLING INSTRUCTIONS: .- . Monthly billings submitted by Standard Form 1080 or another approveh form will be supported by appropriate

439

Safety and Technical Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety and Technical Services Safety and Technical Services Minimize The Safety and Technical Services (STS) organization is a component of the Office of Science's (SC's) Oak Ridge Integrated Support Center. The mission of STS is to provide excellent environmental, safety, health, quality, and engineering support to SC laboratories and other U.S. Department of Energy program offices. STS maintains a full range of technically qualified Subject Matter Experts, all of whom are associated with the Technical Qualifications Program. Examples of the services that we provide include: Integrated Safety Management Quality Assurance Planning and Metrics Document Review Tracking and trending analysis and reporting Assessments, Reviews, Surveillances and Inspections Safety Basis Support SharePoint/Dashboard Development for Safety Programs

440

Customer Service Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

NERSC Consulting services  

NLE Websites -- All DOE Office Websites (Extended Search)

Consulting Services Consulting Services Consulting Services Consulting Consultants and Account Support staff are available to assist users from 8 AM to 5 PM Pacific time, Monday through Friday (except Berkeley Lab holidays). Questions and problems submitted through the On-Line Help Desk are immediately sent to the consulting staff and this is the preferred method of communication. NERSC staff can be reached at 1-800-66-NERSC (USA) or 510-486-8600 (local and international); or email consult@nersc.gov to speak with a consultant and accounts@nersc.gov to speak with Account Support staff. Users may sometimes contact specific User Services staff members directly by phone or email, but in that case there is no guarantee of a timely response. Staff members are often involved with other time-critical assignments and may not

442

TTA supported service availability  

Science Conference Proceedings (OSTI)

The Time-Triggered Architecture (TTA) is a distributed architecture for high-dependability real-time applications. In this paper the mechanisms that guarantee a high availability of TTA services are presented. The paper starts with a deliberation on ...

H. Kopetz

2005-04-01T23:59:59.000Z

443

Services Via Mobility Portals  

Science Conference Proceedings (OSTI)

This paper examines the importance of mobility portal services and the technologies that will be essential in delivering content over next generation network technologies.A discussion of some examples of the different mobile portals currently available ...

D. Ralph; C. G. Shephard

2001-01-01T23:59:59.000Z

444

Degree Services Registrar's Office  

E-Print Network (OSTI)

Degree Services Registrar's Office Name (please print Fund. of Hydrogen as an Energy Carrier (1) _____ CM/ENT 3978 Hydrogen Measurements Laboratory (1/SS 4520 Sustainable Futures II (3)* _____ ENT 3956 Industrial Health and Safety (2)* _____ ENT 3975 Intro

445

The Semiconductor Applet Service  

Science Conference Proceedings (OSTI)

May 11, 2007 ... Educational Java Applet Service (JAS). Launch Site Edited: 7/2/2008 at 10:57 AM by Cathy Rohrer. Comment on Posting · Quote Top Bottom ...

446

Experiments in service learning  

E-Print Network (OSTI)

Service learning, an educational method that involves the application of academic work to projects that benefit under-served communities, was explored in two complementary forms. First, the development of an alternative ...

Banzaert, Amy, 1976-

2006-01-01T23:59:59.000Z

447

Exhibitor Services Kit  

Science Conference Proceedings (OSTI)

Nov 9, 2009 ... company's look and image, attracts business and shows off your most important assets. ...... On-site supervisors with dedicated floor managers ...... Wireless Service (Enterprise) includes one (1) 256Kbps shared Ethernet ...

448

Warehouse and Service Building Renovations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Warehouse and Service Building Renovations Warehouse and Service Building Renovations Warehouse and Service Building Renovations October 16, 2013 - 4:59pm Addthis Renewable Energy Options for Warehouse and Service Building Renovations Daylighting Solar Ventilation Preheating Solar Water Heating Photovoltaics (PV) Many Federal facilities include warehouses or other buildings used for storage service such as motor pools or groundskeeping, hangars, or other spaces that are frequently open to the outside and have only semi-conditioned spaces. Use of daylighting and solar ventilation preheat are prime technologies for these type of spaces, but other technologies may also warrant consideration. Daylighting Daylighting can keep lighting costs down dramatically in warehouses and can be as simple as implementing translucent roofing materials or skylights.

449

A Look at Retail and Service Buildings - Index Page  

U.S. Energy Information Administration (EIA) Indexed Site

Retail and Services Retail and Services Home: A Look at CBECS Building Activities How large are they? How many employees are there? Where are they located? How old are they? Who owns and occupies them? How do they use energy and how much does it cost? How do they use electricity? How do they use natural gas? What types of equipment do they use? How do they measure up on conservation efforts? Summary Comparison Table (All Activities) RETAIL AND SERVICE BUILDINGS There were an estimated 1,289,000 retail and service buildings in the U.S. in 1995. Number of Buildings In the Commercial Buildings Energy Consumption Survey (CBECS), information is collected separately for service buildings, enclosed malls, strip shopping centers, and retail buildings other than malls. In most CBECS publications, these types are all grouped into one category; where possible, this profile will look at each of these separately.

450

Service. How to choose the best company for a job  

SciTech Connect

The following list of the preferred parameters that should be used to select a service company are ranked in order of importance: (1) the best product, (2) the best personnel, (3) the best technology, (4) the best track record, (5) adequate size of company to do the job, and (6) a reasonable cost of the equipment or services. Products of service companies not only include the service itself, but also the equipment, tools and materials to perform the job. Having good quality products is far more important than having cheap or less expensive products, as this enhances the chance of getting the job done on time and without damaging the well. An analysis is provided of each of the criteria for selecting a service company.

Sparlin, D.

1982-01-01T23:59:59.000Z

451

SNAP: A Protocol for Negotiating Service Level Agreements and Coordinating Resource Management in Distributed Systems  

Science Conference Proceedings (OSTI)

A fundamental problem in distributed computing is to map activities such as computation or data transfer onto resources that meet requirements for performance, cost, security, or other quality of service metrics. The creation of such mappings requires ...

Karl Czajkowski; Ian T. Foster; Carl Kesselman; Volker Sander; Steven Tuecke

2002-07-01T23:59:59.000Z

452

Performance Based Service Acquisition Toolkit | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Performance Based Service Acquisition Toolkit Performance Based Service Acquisition Toolkit Aviation Management Green Leases Executive Secretariat Energy Reduction at...

453

Safety and Health Services Division  

NLE Websites -- All DOE Office Websites (Extended Search)

The Safety & Health Services Division (SHSD) provides subject matter expertise and services in industrial hygiene, safety engineering, and safety & health programs for the Lab....

454

Time-critical information services  

Science Conference Proceedings (OSTI)

Emergency medical services have never been more ready for the implementation of time-critical interorganizational information services for the public good.

Thomas A. Horan; Benjamin L. Schooley

2007-03-01T23:59:59.000Z

455

Staff Services | Brookhaven National Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

services that support and assist the world-class scientific research performed at Brookhaven National Laboratory. Our services are available to all Brookhaven Departments,...

456

On-line Service Scheduling?  

E-Print Network (OSTI)

is not allowed unless, in some service policies, the jumping job belongs to a class ... service policies via the worst case analysis, and focus on the relationship

457

Services Initiatives | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Services Initiatives Services Initiatives The Transportation Team Uses Alternative Fueled Vehicles in HQ Fleet 73% of HQ Fleet is alternative fueled (FY2011). HQ utilizes biodiesel...

458

Location-based communication services  

Science Conference Proceedings (OSTI)

Our demo shows end-user-oriented location-based services based on application-layer, human understandable location descriptions. Keywords: internet telephony, location-based services

Xiaotao Wu; Ron Shacham; Matthew J. Mintz-Habib; Kundan Singh; Henning Schulzrinne

2004-10-01T23:59:59.000Z

459

Employee Services | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Document Imaging Exchange Visitors Program Facility Operations Food Services Graphics Mail and Distribution Parking and Garage Photography Printing Recycling Safety and...

460

Final -Cost Pub Rpt-May 22.pub  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 AUDIT REPORT U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES COST SHARING AT THE ASHTABULA ENVIRONMENTAL MANAGEMENT PROJECT JUNE 2002 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman (Signed) Inspector General SUBJECT: INFORMATION: Audit Report on "Cost Sharing at the Ashtabula Environmental Management Project" BACKGROUND From 1952 through 1988, RMI Titanium Company (RMI), a private company, performed work for the Department of Energy and its predecessor agencies as well as for various commercial customers. RMI's commercial work involved processing uranium and non-radioactive metals, such as copper and copper alloys. Historically, the Federal Government has not reimbursed

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Electric Demand Cost Versus Labor Cost: A Case Study  

E-Print Network (OSTI)

Electric Utility companies charge industrial clients for two things: demand and usage. Depending on type of business and hours operation, demand cost could be very high. Most of the operations scheduling in a plant is achieved considering labor cost. For small plants, it is quite possible that a decrease in labor could result in an increase in electric demand and cost or vice versa. In this paper two cases are presented which highlight the dependence of one on other.

Agrawal, S.; Jensen, R.

1998-04-01T23:59:59.000Z

462

A cost analysis model for heavy equipment  

Science Conference Proceedings (OSTI)

Total cost is one of the most important factors for a heavy equipment product purchase decision. However, the different cost views and perspectives of performance expectations between the different involved stakeholders may cause customer relation problems ... Keywords: Cost responsibilities, Operating costs, Ownership costs, Post-Manufacturing Product Cost (PMPC), System life-cycle cost

Shibiao Chen; L. Ken Keys

2009-05-01T23:59:59.000Z

463

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2008-03-01T23:59:59.000Z

464

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

2007-04-01T23:59:59.000Z

465

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2009-12-01T23:59:59.000Z

466

Evaluating the costs of desalination and water transport  

E-Print Network (OSTI)

Working paper FNU-41 revised Many regions of the world are facing formidable freshwater scarcity. Although there is substantial scope for economizing on the consumption of water without affecting its service level, the main response to water scarcity has been to increase the supply. To a large extent, this is done by transporting water from places where it is abundant to places where it is scarce. At a smaller scale, and without a lot of public and political attention, people have started to tap into the sheer limitless resource of desalinated water. This study looks at the development of desalination and its costs over time. The unit costs of desalinated water for five main processes are evaluated, followed by regressions to analyze the main influencing factors to the costs. The unit costs for all processes have fallen considerably over the years. This study suggests that a cost of 1 $/m 3 for seawater desalination and 0.6 $/m 3 for brackish water would be feasible today. The costs will continue to decline in the future as technology progresses. In addition, a literature review on the costs of water transport is conducted in order to estimate the total cost of desalination and the transport of desalinated water to selected water stress cities. Transport costs range from a few cents per cubic meter to over a dollar. A 100 m vertical lift is about as costly as a 100 km horizontal transport (0.05-0.06$/m 3). Transport makes desalinated water prohibitively expensive in highlands and continental interiors, but not elsewhere.

Yuan Zhou A; Richard S. J. Tol B

2004-01-01T23:59:59.000Z

467

Evaluating the costs of desalination and water transport  

E-Print Network (OSTI)

[1] Many regions of the world are facing formidable freshwater scarcity. Although there is substantial scope for economizing on the consumption of water without affecting its service level, the main response to water scarcity has been to increase the supply. To a large extent, this is done by transporting water from places where it is abundant to places where it is scarce. At a smaller scale and without a lot of public and political attention, people have started to tap into the sheer limitless resource of desalinated water. This study looks at the development of desalination and its costs over time. The unit costs of desalinated water for five main processes are evaluated, followed by regressions to analyze the main influencing factors to the costs. The unit costs for all processes have fallen considerably over the years. This study suggests that a cost of $1/m 3 for seawater desalination and $0.6/m 3 for brackish water would be feasible today. The costs will continue to decline in the future as technology progresses. In addition, a literature review on the costs of water transport is conducted in order to estimate the total cost of desalination and the transport of desalinated water to selected water stress cities. Transport costs range from a few cents per cubic meter to over a dollar. A 100 m vertical lift is about as costly as a 100 km horizontal transport ($0.05–0.06/m 3). Transport makes desalinated water prohibitively expensive in highlands and continental interiors but not elsewhere.

Yuan Zhou; Richard S. J. Tol

2005-01-01T23:59:59.000Z

468

The cost of wetland creation and restoration. Final report  

SciTech Connect

This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

King, D.; Bohlen, C.

1995-08-01T23:59:59.000Z

469

Today in Energy - High airline jet fuel costs prompt cost ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration ... and idling time. ... Delta stated that it anticipates cost savings of $300 million per year as a result of this ...

470

An Explanation of F&A Costs What are F&A Costs?  

E-Print Network (OSTI)

An Explanation of F&A Costs What are F&A Costs? Costs involved in conducting sponsored projects costs and F&A costs together are the actual cost of a sponsored project. Direct costs are "those costs, indirect costs cannot be specifically attributed to an individual project. For example, it is difficult

471

NNSA Service Center Chart | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSA Service Center Chart NNSA Service Center Chart Office of Chief Counsel at the NNSA Service Center in Albuquerque, NM NNSA Service Center Chart More Documents & Publications...

472

Customer Services Handbook, 2010, Office of Administration |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Customer Services Handbook, 2010, Office of Administration Customer Services Handbook, 2010, Office of Administration Customer Services Handbook Customer Services Handbook, 2010,...

473

Alternative Energy Services | Open Energy Information  

Open Energy Info (EERE)

Services Jump to: navigation, search Logo: Alternative Energy Services Name Alternative Energy Services Place Florida Product renewable energy products and services Phone number...

474

Transportation and Program Management Services | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Program Management Services Transportation and Program Management Services Overview of Secured Transportation Services (STS) Transportation and Program Management Services More...

475

Electric utilities broaden their vision, again, and move beyond energy services...to communications services  

SciTech Connect

Energy production and delivery will be tightly coupled with telecommunications and information services for the foreseeable future. In order to control access to the customer and prevent erosion of their customer bases, utilities will be driven to become more aggressive in deploying both supply-side information technologies for improved operation of their generation, transmission, and distribution facilities; and demand side Energy Information Service (EIS). Those information services will enable utilities to provide higher quality services at lower cost with lower environmental impact, and to give their ratepayers better control over their power usage. Utilities have important assets that will be valuable in deploying telecommunications networks that support EIS and other value-added information services. Electric power utilities have the potential to become significant players in the National Information Infrastructure, providing commercial EIS, non-energy value-added services, and telecommunications services. Utility entry into telecommunications markets would bring more competition to those markets and contribute toward universal service goals. Regulatory restrictions on utility entry into telecommunications markets are inconsistent with more recent government policies promoting competition. Joint ventures and other forms of partnering will be necessary to build utility networks, and partnering with telecommunications companies will be especially important to utilities. Pivotal business alliances and regulatory policies that will shape the business environment for both industries are likely to be decided int the next few years. Utilities face a brief window of necessity and opportunity: the necessity to assess the EIS and telecommunications capabilities they will need to support their core business in the future; and the opportunity to consider what new sources of revenue could be opened up by those capabilities.

Mann, M. [Electric Power Research Institutes, Palo Alto, CA (United States)

1995-12-01T23:59:59.000Z

476

Supply Side Management Kit: Service for Energy Suppliers and Process Industry Customers  

Science Conference Proceedings (OSTI)

The Supply Side Management Kit highlights proposed EPRI's services for energy suppliers and process industries in the supply side area. With the onset of electricity deregulation, process industry customers are increasingly looking at reducing energy costs on the supply of energy. The new environment has created significant opportunities for cost-effective purchase, management, generation, utilization, and sale of energy for process industries. This kit discusses the services offered by EPRI to meet its ...

1999-10-28T23:59:59.000Z

477

Hydrogen refueling station costs in Shanghai  

E-Print Network (OSTI)

tool to compare existing cost estimates from the literature,It compiles and organizes cost estimates obtained from aE. Hydrogen supply: cost estimate for hydrogen pathways—

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

478

NIST Measurement Services: Natural Gas Flow Calibration Service (NGFCS)  

E-Print Network (OSTI)

NIST Measurement Services: Natural Gas Flow Calibration Service (NGFCS) NIST Special Publication of Standards and Technology #12;i Table of Contents for the Natural Gas Flowmeter Calibration Service (NGFCS;1 Abstract This document describes NIST's high pressure natural gas flow calibration service (NGFCS). Flow

Magee, Joseph W.

479

Microsoft Word - BSA NC Service Rev 9.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

9; (Aug. 2011) 1 of 21 9; (Aug. 2011) 1 of 21 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NON-COMMERCIAL SERVICES AT BROOKHAVEN NATIONAL LABORATORY Section 1 - General Clauses Applicable to Fixed Price and Cost Type Contracts. ....................................................... 2 Article 1.1 Definitions ............................................................................................................................................ 2 Article 1.2 Order of Precedence ............................................................................................................................. 2 Article 1.3 Acceptance of Agreement .................................................................................................................... 2

480

Minimalist object oriented service discovery protocol for wireless sensor networks  

Science Conference Proceedings (OSTI)

This paper presents a new Service Discovery Protocol (SDP) suitable for Wireless Sensor Networks (WSN). The restrictions that are imposed by ultra low-cost sensor and actuators devices (basic components of a WSN) are taken into account to reach a minimal ...

D. Villa; F. J. Villanueva; F. Moya; F. Rincón; J. Barba; J. C. López

2007-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "ancillary service cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Techniac and Cost Assessment of the PCAST Machine  

E-Print Network (OSTI)

in the PCAST test cell and assembly halls for ancillary equipment and laydown space. This has resulted be provided to gain quick access to the tokamak core. The cryostat base is supported off the test cell floor through the upper and lower cryostat shell. Test Cell layout Plan and elevation views of the PCAST device

482

Summary: DUF6 Management Cost Analysis Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7650 7650 Depleted Uranium Hexafluoride Management Program Summary of the COST ANALYSIS REPORT for the Long-term Management of Depleted Uranium Hexafluoride Prepared for the Department of Energy by Lawrence Livermore National Laboratory September 1997 DISCLAIMER This document was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the University of California nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer,

483

Office of Headquarters Procurement Services - Employee Customer Service  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Headquarters Procurement Services - Employee Customer Office of Headquarters Procurement Services - Employee Customer Service Standards Office of Headquarters Procurement Services - Employee Customer Service Standards CUSTOMER FOCUS The Office of Headquarters Procurement Services (MA-64) serves a variety of customers in the performance of its acquisition and financial assistance mission. Primary among its many customers is each of the Department of Energy Headquarters program offices. MA-64 continually seeks to improve service to its customers, by prioritizing its workload through a better understanding of customer needs; providing effective assistance in the development of quality procurement request packages; improving the timeliness of procurement transactions through the establishment of mutually agreeable transaction milestone

484

Biodiesel Performance, Costs, and Use  

U.S. Energy Information Administration (EIA)

Biodiesel Performance, Costs, and Use. by Anthony Radich. Introduction. The idea of using vegetable oil for fuel has been around as long as the diesel engine.

485

HTGR Cost Model Users' Manual  

Science Conference Proceedings (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

486

Download Data | Transparent Cost Database  

Open Energy Info (EERE)

in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a...

487

Preemptive scheduling with position costs  

E-Print Network (OSTI)

horizon is divided into time periods. In these models, the whole production is not processed in a single period, and production and holding costs are introduced ...

488

FIRM PRODUCTIVITY AND SUNK COSTS  

E-Print Network (OSTI)

The main objective of this paper is to explore whether or not sunk costs are systematically related to productivity di¤erences at the …rm level, as suggested by models of industry dynamics (Hopenhayn, 1992).The comparisons of productivity distributions for groups of …rms with di¤erent levels of sunk costs are performed by non-parametric procedures and for a large scale …rm-level panel data set of Spanish manufacturing …rms. We …nd that sunk costs are an important source of heterogeneity across …rm productivity. The evidence we …nd is consistent with models of industry dynamics predicting lower productivity for …rms with a higher level of sunk costs.

Jose C. Farińas; Sonia Ruano

2004-01-01T23:59:59.000Z

489

WSRC Nuclear Materials Cost Module  

National Nuclear Security Administration (NNSA)

Office (GAO) WSRC NM Cost Module Generates WSRC monthly and fiscal year to date Inventory and Manufacturing Statement for government owned accountable nuclear materials....

490

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network (OSTI)

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling Oak Ridge National been identified by carbon fiber manufacturers as a market with substantial growth potential. When manufactured with carbon fiber as opposed to traditional materials such as steel, automotive parts are able

491

Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009  

Gasoline and Diesel Fuel Update (EIA)

Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009 Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009 Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009 Released: September 28, 2010 Next Release: Discontinued Excel Spreadsheet Model - 1994-2009 XLS (1,178 KB) Overview Oil and gas well equipment and operating costs, including coal bed methane costs, stopped their upward trend from the 1990s and fell sharply in 2009. The extremely high oil and gas prices during the first half of 2008 followed by an unprecedented drop to very low prices by the end of the year had a major impact on equipment demand. Operating costs tumbled also because fuel costs were reduced and well servicing rates fell in most areas. The exceptions were in California where electric rates continued to increase, causing a one (1) percent increase in annual operating costs for leases producing from 12,000 feet. Operating cost for coal bed methane wells in the Appalachian and Powder River areas increased because electric rates continued to climb. Due to the timing of the data collection, the cost reported here could be higher than the actual annual average for 2008. However, some production costs (labor and equipment) are not as volatile as drilling, pipe, and other well completion costs, so the effect of the oil and gas prices on collected data may be lessened. Annual average electric rates and natural gas prices are used, which also helps to dampen cost variances.

492

DOE Awards New York Decommissioning Services Contract | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New York Decommissioning Services Contract New York Decommissioning Services Contract DOE Awards New York Decommissioning Services Contract June 29, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 William.taylor@emcbc.doe.gov West Valley, NY -- The Department of Energy (DOE) today awarded a contract to CH2M Hill-B&W West Valley of Englewood, Colorado, for the Phase I Decommissioning and Facility Disposition activities at the West Valley Demonstration Project (WVDP). The contract is a performance-based, cost-plus-award-fee, completion type contract with cost and schedule incentives. The total contract value is $333.4 million. DOE has selected a phased approach for decommissioning activities at the WVDP. Phase I is the first of a two-phase process for the final decommissioning of the western New York site in accordance with the West

493

How to Estimate the Value of Service Reliability Improvements  

Science Conference Proceedings (OSTI)

A robust methodology for estimating the value of service reliability improvements is presented. Although econometric models for estimating value of service (interruption costs) have been established and widely accepted, analysts often resort to applying relatively crude interruption cost estimation techniques in assessing the economic impacts of transmission and distribution investments. This paper first shows how the use of these techniques can substantially impact the estimated value of service improvements. A simple yet robust methodology that does not rely heavily on simplifying assumptions is presented. When a smart grid investment is proposed, reliability improvement is one of the most frequently cited benefits. Using the best methodology for estimating the value of this benefit is imperative. By providing directions on how to implement this methodology, this paper sends a practical, usable message to the industry.

Sullivan, Michael J.; Mercurio, Matthew G.; Schellenberg, Josh A.; Eto, Joseph H.

2010-06-08T23:59:59.000Z

494

DOE Awards New York Decommissioning Services Contract | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New York Decommissioning Services Contract New York Decommissioning Services Contract DOE Awards New York Decommissioning Services Contract June 29, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 William.taylor@emcbc.doe.gov West Valley, NY -- The Department of Energy (DOE) today awarded a contract to CH2M Hill-B&W West Valley of Englewood, Colorado, for the Phase I Decommissioning and Facility Disposition activities at the West Valley Demonstration Project (WVDP). The contract is a performance-based, cost-plus-award-fee, completion type contract with cost and schedule incentives. The total contract value is $333.4 million. DOE has selected a phased approach for decommissioning activities at the WVDP. Phase I is the first of a two-phase process for the final decommissioning of the western New York site in accordance with the West

495

Utility Energy Services Contracts: Enabling Documents Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents Documents Update San Diego, CA November 28, 2007 Deb Beattie & Karen Thomas Overview  Legislative & Executive Actions  Legal Opinions  Agency Guidance  Contracts  Sample Documents  Resources www.eere.energy.gov/femp/pdfs/28792.pdf Enabling Legislation for Utility Programs Energy Policy Act of 1992 Section 152(f) - Utility Incentive Programs Section 152(f) - Utility Incentive Programs Agencies:  Are authorized and encouraged to participate in utility programs generally available to customers  May accept utility financial incentives, goods, and services generally available to customers  Are encouraged to enter into negotiations with utilities to design cost effective programs to address unique needs of facilities used by agency

496

Argonne TDC: Asset Environmental Services  

Small business teams with Argonne for urban revitalization effort. Asset Environmental Services Chicago, IL

497

FTP Upload Service  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC FTP NERSC FTP Upload Service NERSC FTP Upload Service L The NERSC FTP Upload service is designed for external collaborators to be able to send data to NERSC staff and users. It allows you to create a temporary FTP account to upload files that will be delivered to a NERSC user. You must specify a valid NERSC user as the receiver for your uploads. Once you successfully fill out this form you will receive a username and password that can be used to access an FTP server. You can use any FTP client to upload files. The target NERSC user will receive an email letting him/her know that they have an upload waiting for them. Uploads will automatically expire after a week. After the email has been sent, the NERSC user can retrieve the file with "take -u ftpup ".

498

Services For Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Posed group photo and laptop computers Posed group photo and laptop computers Services For Staff Where employees can find important information on health and safety, communications services, proposals and subcontracts, and program development. The links on this page for EETD staff only. Find help on safety and emergency procedures, budgets, proposals, subcontracts, and communications services such as web development. Budget Office and Proposals/Subcontracts Group Contact EETD's Budget Office for budget management support. For help writing research proposals or initiating subcontracts, contact EETD's Proposals/Subcontracts Group. Program Development The Program Development Office can help you develop sources of funding and partnerships for research. Communications Office The Communications Office is a creative group within EETD supporting the

499

Services | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Services Services Services OE plays a major role in addressing immediate challenges to America's energy security, while sustaining applied research into new technologies and implementing policies to meet the challenges we will face in the future. Electricity Advisory Committee (EAC) Technology Development Electricity Policy Coordination & Implementation DOE Grid Tech Team Energy Assurance Cybersecurity Provides advice to the U.S. Department of Energy in implementing the Energy Policy Act of 2005, executing the Energy Independence and Security Act of 2007, and modernizing the nation's electricity delivery infrastructure. OE supports a portfolio of technology development and deployment programs that will modernize our Nation's electric delivery system. OE is laying the framework for a modern electricity system by contributing to the development and implementation of electricity policy at the Federal and State level. Recognizing the need for strategic grid modernization efforts, both internally and externally, DOE established the Grid Tech Team (GTT) to:

500

Services | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Services Services Document Library The Office of Energy Policy and Systems Analysis produces a variety of reports, analyses and papers on a number of energy topics. Check back for archived versions of new documents and reference materials as they are released. Report: U.S. Energy Sector Vulnerabilities to Climate Change and Extreme Weather July 10, 2013 This report-part of the Administration's efforts to support national climate change adaptation planning through the Interagency Climate Change Adaptation Task Force and Strategic Sustainability Planning process established under Executive Order 13514 and to advance the U.S. Department of Energy's goal of promoting energy security-examines current and potential future impacts of these climate trends on the U.S. energy sector.