National Library of Energy BETA

Sample records for analysis work order

  1. Elmira Stove Works: Order (2011-CE-1407)

    Broader source: Energy.gov [DOE]

    DOE ordered Elmira Stove Works to pay a $6,000 civil penalty after finding Elmira Stove Works had failed to certify that certain models of refrigerator-freezers comply with the applicable energy conservation standard.

  2. Department-wide Quick Reaction Work Order System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-03-12

    To describe the new Department Wide Quick Reaction Work Order System, to establish the criteria and procedures for its use, and to identify responsibilities for managing and operating the system.

  3. Personal Property Retirement Work Order, HQ Form 1400.20 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Retirement Work Order, HQ Form 1400.20 Personal Property Retirement Work Order, HQ Form 1400.20 Retirement Work Order Personal Property Retirement Work Order, HQ Form 1400.20 (90.92 KB) More Documents & Publications DOE F 1400.20 DOE HQ F 580-2 DOE HQ F 580

  4. Current work in energy analysis

    SciTech Connect (OSTI)

    1998-03-01

    This report describes the work performed at Berkeley Lab most recently. One of the Labs accomplishments is the publication of Scenarios of US Carbon Reductions, an analysis of the potential of energy technologies to reduce carbon emissions in the US. This analysis is described and played a key role in shaping the US position on climate change in the Kyoto Protocol negotiations. The Labs participation in the fundamental characterization of the climate change issue by the IPCC is described. Described also is a study of leaking electricity, which is stimulating an international campaign for a one-watt ceiling for standby electricity losses from appliances. This ceiling has the potential to save two-thirds of the 5% of US residential electricity currently expended on standby losses. The 54 vignettes contained in the report summarize results of research activities ranging in scale from calculating the efficacy of individual lamp ballasts to estimating the cost-effectiveness of the national Energy Star{reg_sign} labeling program, and ranging in location from a scoping study of energy-efficiency market transformation in California to development of an energy-efficiency project in the auto parts industry in Shandong Province, China.

  5. DOE Order 484.1, Reimbursable Work for the Department of Homeland...

    Office of Environmental Management (EM)

    Order 484.1, Reimbursable Work for the Department of Homeland Security Change DOE Order 484.1, Reimbursable Work for the Department of Homeland Security Change The purpose of this ...

  6. NREL: Energy Analysis - Working with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Us ...Your team is superb. It is always energizing to come to the lab and hear about the many types of analysis projects the team is working on. And it was particularly inspiring to see so many young analysts who are strong technically, extremely articulate, and passionate about their work. - Susan Tierney Managing Principal The Analysis Group The Strategic Energy Analysis Center (SEAC) staff, based in Washington, D.C. and Golden, Colorado, have capabilities that span a wide range

  7. HAMMER Budget Analysis (09-001) STATEMENT OF WORK

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAMMER Budget Analysis (09-001) STATEMENT OF WORK In order to develop the HAMMER baseline activity prior to taking over programmatic responsibility and to allow for decisions prior to the next fiscal year, the MSA Portfolio Management will provide budget analysis and trade study services to DOE-RL in support of analysis of the following tasks: 1. Perform a detailed analysis of the budget process used for funding the HAMMER facility and Hanford Training 2. Perform an analysis of HAMMER training

  8. DOE Order 484.1, Reimbursable Work for the Department of Homeland Security

    Office of Environmental Management (EM)

    Change | Department of Energy Order 484.1, Reimbursable Work for the Department of Homeland Security Change DOE Order 484.1, Reimbursable Work for the Department of Homeland Security Change The purpose of this Flash is to inform contracting personnel that the department issued an administrative change to DOE Order 484.1, Reimbursable Work for the Department of Homeland Security. The changes update organizational names and references. Attached is a summary of the change with the updated

  9. DOE Order 412.1a, Work Authorization System Administrative Change

    Broader source: Energy.gov [DOE]

    "The purpose of this Flash is to inform contracting personnel the department issued an administrative change to DOE Order 412.1a, Work Authorization System. The changes update organizational names, references, websites, etc. Attached is a summary of the change with the updated order. Additionally, the order may be found at: https://www.directives.doe.gov/directives-documents/0412.1-BOrder-A-admchg1"

  10. Hydrgoen Storage Systems Analysis Working Group Meeting Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Summary report from the May 17, 2007...

  11. Work Order Generation Macros for Word Perfect 6.X for Windows

    Energy Science and Technology Software Center (OSTI)

    1997-09-02

    Included are three general WP macros (two independent and one multiple) and a template used at the Test Reactor Area (TRA) for the generation of the Work Orders (WO's) used to perform corrective and preventative maintenance, as well as modifications of existing systems and installation of new systems. They incorporate facility specific requirements as well as selected federal/state orders. These macros are used to generate a WP document which is then converted into ASCII textmore » for import to the maintenance software. Currently we are using MCRS but should be compatible with other platforms such as Passport. Reference the included file Wogen.txt for installation and usage instructions.« less

  12. Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Summary report from the May 17, 2007 Hydrogen Storage Systems Analysis Working Group Meeting ssawg_may_summary.pdf (167.2 KB) More Documents & Publications Hydrogen Storage Systems Anlaysis Working Group Meeting, December 12, 2006 Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report Hydrogen Storage Systems

  13. ORDER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP&L EnergyPlus Company Order No. EA-210 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On May 4, 1999, PP&L EnergyPlus Company (PP&L EnergyPlus) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. PP&L EnergyPlus, a limited

  14. Fractional Hamiltonian analysis of higher order derivatives systems

    SciTech Connect (OSTI)

    Baleanu, Dumitru; Muslih, Sami I.; Tas, Kenan

    2006-10-15

    The fractional Hamiltonian analysis of 1+1 dimensional field theory is investigated and the fractional Ostrogradski's formulation is obtained. The fractional path integral of both simple harmonic oscillator with an acceleration-squares part and a damped oscillator are analyzed. The classical results are obtained when fractional derivatives are replaced with the integer order derivatives.

  15. Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Summary of June 11, 2008, biannual meeting of the Hydrogen Storage Systems Analysis Working Group. ssawg_summary_report_0608.pdf (52.38 KB) More Documents & Publications Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Technical Assessment of Organic Liquid Carrier Hydrogen Storage Systems for Automotive Applications Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report

  16. Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The objective of these biannual Working Group meetings is to bring together the DOE research community involved in systems analysis of hydrogen storage materials and processes. ssawg_summary_report.pdf (266.68 KB) More Documents & Publications Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report Hydrogen Storage Systems Anlaysis Working Group Meeting, December 12, 2006

  17. Example Work Domain Analysis for a Reference Sodium Fast Reactor

    SciTech Connect (OSTI)

    Hugo, Jacques; Oxstrand, Johanna

    2015-01-01

    The nuclear industry is currently designing and building a new generation of reactors that will include different structural, functional, and environmental aspects, all of which are likely to have a significant impact on the way these plants are operated. In order to meet economic and safety objectives, these new reactors will all use advanced technologies to some extent, including new materials and advanced digital instrumentation and control systems. New technologies will affect not only operational strategies, but will also require a new approach to how functions are allocated to humans or machines to ensure optimal performance. Uncertainty about the effect of large scale changes in plant design will remain until sound technical bases are developed for new operational concepts and strategies. Up-to-date models and guidance are required for the development of operational concepts for complex socio-technical systems. This report describes how the classical Work Domain Analysis method was adapted to develop operational concept frameworks for new plants. This adaptation of the method is better able to deal with the uncertainty and incomplete information typical of first-of-a-kind designs. Practical examples are provided of the systematic application of the method in the operational analysis of sodium-cooled reactors. Insights from this application and its utility are reviewed and arguments for the formal adoption of Work Domain Analysis as a value-added part of the Systems Engineering process are presented.

  18. Hydrogen Storage Systems Analysis Working Group Meeting: Summary...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Technical Assessment of Organic Liquid Carrier Hydrogen Storage Systems for ...

  19. Hydrogen Storage Systems Analysis Working Group Meeting: Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The objective of these biannual Working Group meetings is to bring together the DOE research community involved in systems analysis of hydrogen storage materials and processes. PDF ...

  20. Analysis of Integrated Safety Management at the Activity Level: Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Control, Final Report | Department of Energy Analysis of Integrated Safety Management at the Activity Level: Work Planning and Control, Final Report Analysis of Integrated Safety Management at the Activity Level: Work Planning and Control, Final Report May 15, 2013 Presenter: Stephen L. Domotor, Director, Office of Analysis, Office of Health, Safety and Security Topic: On August 28, 2012, the Defense Nuclear Facilities Safety Board (DNFSB or "Board") wrote to the

  1. Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Held in Conjunction with the DOE Hydrogen Program Annual Merit Review Crystal Gateway Marriott, Arlington, VA June 11, 2008 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory and Elvin Yzugullu Sentech, Inc. July 18, 2008 SUMMARY REPORT Hydrogen Storage Systems Analysis Working Group Meeting June 11, 2008 Crystal Gateway Marriott, Arlington, VA Meeting Objectives This meeting was one of a continuing series of biannual meetings of the Hydrogen Storage Systems Analysis Working

  2. Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Storage Systems Analysis Working Group Meeting Argonne DC Offices L'Enfant Plaza, Washington, DC December 4, 2007 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory and Kristin Deason Sentech, Inc. January 16, 2008 SUMMARY REPORT Hydrogen Storage Systems Analysis Working Group Meeting December 4, 2007 Argonne DC Offices, L'Enfant Plaza, Washington, DC Meeting Objectives This meeting was one of a continuing series of biannual meetings of the Hydrogen Storage Systems

  3. Guidance on Life-Cycle Cost Analysis Required by Executive Order...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Life-Cycle Cost Analysis Required by Executive Order 13123 Guidance on Life-Cycle Cost Analysis Required by Executive Order 13123 Guide describes the clarification of how agencies ...

  4. Microscopic analysis of order parameters in nuclear quantum phase transitions

    SciTech Connect (OSTI)

    Li, Z. P.; Niksic, T.; Vretenar, D.; Meng, J.

    2009-12-15

    Microscopic signatures of nuclear ground-state shape phase transitions in Nd isotopes are studied using excitation spectra and collective wave functions obtained by diagonalization of a five-dimensional Hamiltonian for quadrupole vibrational and rotational degrees of freedom, with parameters determined by constrained self-consistent relativistic mean-field calculations for triaxial shapes. As a function of the physical control parameter, the number of nucleons, energy gaps between the ground state and the excited vibrational states with zero angular momentum, isomer shifts, and monopole transition strengths exhibit sharp discontinuities at neutron number N=90, which is characteristic of a first-order quantum phase transition.

  5. Performance Analysis: Work Control Events Identified January - August 2010

    SciTech Connect (OSTI)

    De Grange, C E; Freeman, J W; Kerr, C E; Holman, G; Marsh, K; Beach, R

    2011-01-14

    This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting in each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded elements of an institutional work planning and control system. By the end of that year this system was documented and implementation had begun. In 2009

  6. Work Domain Analysis Methodology for Development of Operational Concepts for Advanced Reactors

    SciTech Connect (OSTI)

    Hugo, Jacques

    2015-05-01

    This report describes a methodology to conduct a Work Domain Analysis in preparation for the development of operational concepts for new plants. This method has been adapted from the classical method described in the literature in order to better deal with the uncertainty and incomplete information typical of first-of-a-kind designs. The report outlines the strategy for undertaking a Work Domain Analysis of a new nuclear power plant and the methods to be used in the development of the various phases of the analysis. Basic principles are described to the extent necessary to explain why and how the classical method was adapted to make it suitable as a tool for the preparation of operational concepts for a new nuclear power plant. Practical examples are provided of the systematic application of the method and the various presentation formats in the operational analysis of advanced reactors.

  7. Technical Work Plan For: Meteorological Monitoring and Data Analysis

    SciTech Connect (OSTI)

    C.T. Bastian

    2003-03-28

    The meteorological monitoring and analysis program has three overall objectives. First, the program will acquire qualified meteorological data from monitoring activities in the Environmental Safety and Health (ES&H) network, including appropriate controls on measuring and test equipment. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The continuously operating monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. Second, the program will process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. Third, reports containing analyses or calculations could be created to provide information to data requesters.

  8. Technical Work Plan For: Meteorological Monitoring Data Analysis

    SciTech Connect (OSTI)

    R. Green

    2006-02-06

    The meteorological monitoring and analysis program has five objectives. (1) Acquire qualified meteorological data from YMP meteorological monitoring network using appropriate controls on measuring and test equipment. Because this activity is monitoring (i.e., recording naturally occurring events) pre-test predictions are not applicable. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The meteorological monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. (2) Process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. (3) Develop analyses or calculations to provide information to data requesters and provide data sets as requested. (4) Provide precipitation amounts to Site Operations to support requirements to perform inspections in the Stormwater Pollution Prevention Plan (implemented in LP-OM-050Q-BSC) following storm events of greater than 0.5 inches. The program also provides meteorological data during extreme weather conditions (e.g., high winds, rainstorms, etc.) to support decisions regarding worker safety. (5) Collect samples of precipitation for chemical and isotopic analysis by the United States Geological Survey (USGS). The BSC ES&H Environmental Compliance organization is responsible for performing this work. Data from calendar-year periods are submitted to the TDMS to provide YMP users with qualified meteorological data for scientific modeling and analyses, engineering designs of surface facilities, performance assessment analyses, and operational safety issues.

  9. Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-12-12

    he purpose of this DOE Standard is to establish guidance for the preparation and review of hazard categorization and accident analyses techniques as required in DOE Order 5480.23, Nuclear Safety Analysis Reports.

  10. Higher-Order, Space-Time Adaptive Finite Volume Methods: Algorithms, Analysis and Applications

    SciTech Connect (OSTI)

    Minion, Michael

    2014-04-29

    The four main goals outlined in the proposal for this project were: 1. Investigate the use of higher-order (in space and time) finite-volume methods for fluid flow problems. 2. Explore the embedding of iterative temporal methods within traditional block-structured AMR algorithms. 3. Develop parallel in time methods for ODEs and PDEs. 4. Work collaboratively with the Center for Computational Sciences and Engineering (CCSE) at Lawrence Berkeley National Lab towards incorporating new algorithms within existing DOE application codes.

  11. Analysis of ISM Activity-level Work Planning and Control Within...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of ISM Activity-level Work Planning and Control Within DOE May 15, 2013 Presenter: Stephen L. Domotor, Office of Analysis, Office of Health, Safety and Security Topics ...

  12. Reduced order models for thermal analysis : final report : LDRD Project No. 137807.

    SciTech Connect (OSTI)

    Hogan, Roy E., Jr.; Gartling, David K.

    2010-09-01

    This LDRD Senior's Council Project is focused on the development, implementation and evaluation of Reduced Order Models (ROM) for application in the thermal analysis of complex engineering problems. Two basic approaches to developing a ROM for combined thermal conduction and enclosure radiation problems are considered. As a prerequisite to a ROM a fully coupled solution method for conduction/radiation models is required; a parallel implementation is explored for this class of problems. High-fidelity models of large, complex systems are now used routinely to verify design and performance. However, there are applications where the high-fidelity model is too large to be used repetitively in a design mode. One such application is the design of a control system that oversees the functioning of the complex, high-fidelity model. Examples include control systems for manufacturing processes such as brazing and annealing furnaces as well as control systems for the thermal management of optical systems. A reduced order model (ROM) seeks to reduce the number of degrees of freedom needed to represent the overall behavior of the large system without a significant loss in accuracy. The reduction in the number of degrees of freedom of the ROM leads to immediate increases in computational efficiency and allows many design parameters and perturbations to be quickly and effectively evaluated. Reduced order models are routinely used in solid mechanics where techniques such as modal analysis have reached a high state of refinement. Similar techniques have recently been applied in standard thermal conduction problems e.g. though the general use of ROM for heat transfer is not yet widespread. One major difficulty with the development of ROM for general thermal analysis is the need to include the very nonlinear effects of enclosure radiation in many applications. Many ROM methods have considered only linear or mildly nonlinear problems. In the present study a reduced order model is

  13. Current Work in Energy Analysis (Energy Analysis Program -1996 Annual Report)

    SciTech Connect (OSTI)

    Energy Analysis Program

    1998-03-01

    This report describes the work that Environmental Energy Technologies Division of Lawrence Berkeley National Laboratory has been doing most recently. One of our proudest accomplishments is the publication of Scenarios of U.S. Carbon Reductions, an analysis of the potential of energy technologies to reduce carbon emissions in the U.S. This analysis played a key role in shaping the U.S. position on climate change in the Kyoto Protocol negotiations. Our participation in the fundamental characterization of the climate change issue by the IPCC is described. We are also especially proud of our study of ''leaking electricity,'' which is stimulating an international campaign for a one-watt ceiling for standby electricity losses from appliances. This ceiling has the potential to save two-thirds of the 5% of U.S. residential electricity currently expended on standby losses. The 54 vignettes contained in the following pages summarize results of research. activities ranging in scale from calculating the efficacy of individual lamp ballasts to estimating the cost-effectiveness of the national ENERGY STAR{reg_sign} labeling program, and ranging in location from a scoping study of energy-efficiency market transformation in California to development of an energy-efficiency project in the auto parts industry in Shandong Province, China. These are the intellectual endeavors of a talented team of researchers dedicated to public service.

  14. Higher-order mode analysis at the BNL Energy Recovery Linac

    SciTech Connect (OSTI)

    Johnson, E.C.; Ben-Zvi, I.; Hahn, H.; Hammons, L.; Xu, W.

    2011-08-03

    Understanding the prevalence and structure of higher-order modes (HOMs) in accelerator cavities is critical because their excitation can result in problematic single bunch and multi-bunch effects. Particularly hazardous are dipole modes, which are more easily excited due to their linear field nature near the beam center. During a recent superconducting test on the energy recovery linac (ERL) cavity at Brookhaven National Laboratory (BNL), 8 of the highest-Q HOMs were measured for the first time. In conjunction with analysis of CST Microwave Studio simulation results for the ERL model, one of these modes was further studied in the copper prototype ERL cavity. A method of identifying HOMs utilizing existing holes drilled in copper cavity cells was developed and used to conclude that the observed high-Q mode was a quadrupole.

  15. TASK ORDER

    National Nuclear Security Administration (NNSA)

    NA0000XXX Task Order No: DE-DT000XXXX Statement of Work August 7, 2015 Task Order Title: Design, Integration, Construction, Communications, and Engineering (DICCE) Services for Port of Cat Lai, Vietnam. Scope: The Contractor shall design, construct, and integrate fully functional portal monitor and communications systems at designated sites in Vietnam. * Port of Cat Lai Requirements Documents: The following task order requirements describe key milestones and deliverables. For a more complete

  16. Process Analysis Work for the DOE Hydrogen Program - 2001 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Process Analysis Work for the DOE Hydrogen Program - 2001 Process Analysis Work for the DOE Hydrogen Program - 2001 Technical paper on the process analysis of DOE hydrogen research projects presented at the 2002 Annual Hydrogen Review held May 6-8, 2002 in Golden, CO. 32405b1.pdf (362.69 KB) More Documents & Publications Proceedings of the 2000 U.S. DOE Hydrogen Program Review Research and Development of a PEM Fuel Cell, Hydrogen Reformer, and Vehicle Refueling Facility

  17. Guidance on Life-Cycle Cost Analysis Required by Executive Order 13123

    Office of Energy Efficiency and Renewable Energy (EERE)

    Guide describes the clarification of how agencies determine the life-cycle cost for investments required by Executive Order 13123.

  18. Reduced order model based on principal component analysis for process simulation and optimization

    SciTech Connect (OSTI)

    Lang, Y.; Malacina, A.; Biegler, L.; Munteanu, S.; Madsen, J.; Zitney, S.

    2009-01-01

    It is well-known that distributed parameter computational fluid dynamics (CFD) models provide more accurate results than conventional, lumped-parameter unit operation models used in process simulation. Consequently, the use of CFD models in process/equipment co-simulation offers the potential to optimize overall plant performance with respect to complex thermal and fluid flow phenomena. Because solving CFD models is time-consuming compared to the overall process simulation, we consider the development of fast reduced order models (ROMs) based on CFD results to closely approximate the high-fidelity equipment models in the co-simulation. By considering process equipment items with complicated geometries and detailed thermodynamic property models, this study proposes a strategy to develop ROMs based on principal component analysis (PCA). Taking advantage of commercial process simulation and CFD software (for example, Aspen Plus and FLUENT), we are able to develop systematic CFD-based ROMs for equipment models in an efficient manner. In particular, we show that the validity of the ROM is more robust within well-sampled input domain and the CPU time is significantly reduced. Typically, it takes at most several CPU seconds to evaluate the ROM compared to several CPU hours or more to solve the CFD model. Two case studies, involving two power plant equipment examples, are described and demonstrate the benefits of using our proposed ROM methodology for process simulation and optimization.

  19. Results and Analysis of the Research and Development Work Scope Request for Information (DE-SOL-0008246)

    SciTech Connect (OSTI)

    Heidrich, Brenden John

    2015-07-01

    The Department of Energy (DOE) Office of Nuclear Energy (NE) released a request for information (RFI) (DE-SOL-0008246) for “University, National Laboratory, Industry and International Input to the Office of Nuclear Energy’s Competitive Research and Development Work Scope Development” on April 13, 2015. DOE-NE solicited information for work scopes for the four main program areas as well as any others suggested by the community. The RFI proposal period closed on June 19, 2015. From the 124 responses, 238 individual work scopes were extracted. Thirty-three were associated with a DOE national laboratory, including Argonne National Laboratory (ANL), Brookhaven National Laboratory (BNL), Idaho National Laboratory (INL), Los Alamos National Laboratory (LANL), Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL). Thirty US universities submitted proposals as well as ten industrial/commercial institutions. Four major R&D areas emerged from the submissions, appearing in more than 15% of the proposed work scopes. These were: nuclear fuel studies, safety and risk analysis, nuclear systems analysis and design and advanced instrumentation and controls. Structural materials for nuclear power plants, used nuclear fuel disposition and various types of systems analysis were also popular, each appearing in more than 10% of the proposals. Nuclear Energy Enabling Technologies (NEET) was the most popular program area with 42% of the proposals referencing the NEET-CTD program. The order of the remaining programs was Fuel Cycle Technologies (FC) at 34%, Nuclear Energy Advanced Modeling and Simulation (NEAMS) at 29% and Reactor Concepts at 17%.

  20. Double Quarter Wave Crab Cavity Field Profile Analysis and Higher Order Mode Characterization

    SciTech Connect (OSTI)

    Marques, Carlos; Xiao, B. P.; Belomestnykh, S.

    2014-06-01

    The Large Hadron Collider (LHC) is underway for a major upgrade to increase its luminosity by an order of magnitude beyond its original design specifications. This novel machine configuration known as the High Luminosity LHC (HL-LHC) will rely on various innovative technologies including very compact and ultra-precise superconducting crab cavities for beam rotation. A double quarter wave crab cavity (DQWCC) has been designed at Brookhaven National Laboratory for the HL-LHC. This cavity as well as the structural support components were fabricated and assembled at Niowave. The field profile of the crabbing mode for the DQWCC was investigated using a phase shift bead pulling technique and compared with simulated results to ensure proper operation or discover discrepancies from modeled results and/or variation in fabrication tolerances. Higher-Order Mode (HOM) characterization was also performed and correlated with simulations.

  1. Second order classical perturbation theory for atom surface scattering: Analysis of asymmetry in the angular distribution

    SciTech Connect (OSTI)

    Zhou, Yun Pollak, Eli; Miret-Arts, Salvador

    2014-01-14

    A second order classical perturbation theory is developed and applied to elastic atom corrugated surface scattering. The resulting theory accounts for experimentally observed asymmetry in the final angular distributions. These include qualitative features, such as reduction of the asymmetry in the intensity of the rainbow peaks with increased incidence energy as well as the asymmetry in the location of the rainbow peaks with respect to the specular scattering angle. The theory is especially applicable to soft corrugated potentials. Expressions for the angular distribution are derived for the exponential repulsive and Morse potential models. The theory is implemented numerically to a simplified model of the scattering of an Ar atom from a LiF(100) surface.

  2. Comparative Analysis Between US NRC Requirements and US DOE Orders - 13402

    SciTech Connect (OSTI)

    Chakraborti, Sayan; Stone, Lynn; Hyatt, Jeannette

    2013-07-01

    Small modular reactor (SMR) is a nuclear reactor design approach that is expected to herald in a new era of clean energy in the U.S. These reactors are less than one-third the size of conventional large nuclear power reactors, and have factory-fabricated components that may be transported by rail or truck to a site selected to house a small nuclear reactor. To facilitate the licensing of these smaller nuclear reactor designs, the Nuclear Regulatory Commission (NRC) is in the process of developing a regulatory infrastructure to support licensing review of these unique reactor designs. As part of these activities, the NRC has been meeting with the Department of Energy (DOE) and with individual SMR designers to discuss potential policy, licensing, and key technical differences in SMR designs. It is anticipated by the NRC that such licensing interaction and guidance early in the design process will contribute towards minimizing complexity while adding stability and predictability in the licensing and subsequent regulation of new reactor designs such as SMRs. In conjunction with the current NRC initiative of developing the SMR licensing process, early communication and collaboration in the identification and resolution of any potential technical and licensing differences between NRC requirements and similar requirements applicable at DOE sites would help to expedite demonstration and implementation of SMR technology in the US. In order to foster such early communication, Savannah River Nuclear Solutions (SRNS) has begun taking the first steps in identifying and evaluating potential licensing gaps that may exist between NRC and DOE requirements in siting SMRs at DOE sites. A comparison between the existing NRC regulations for Early Site Permits and the DOE Orders was undertaken to establish the degree of correlation between NRC requirements and compliance methods in place at DOE sites. The ability to use existing data and information to expedite the development of the

  3. Gain analysis of higher-order-mode amplification in a dielectric-implanted multi-beam traveling wave structure

    SciTech Connect (OSTI)

    Gee, Anthony; Shin, Young-Min

    2013-01-01

    A multi-beam traveling wave amplifier designed with an overmoded staggered double grating array was examined by small signal analysis combined with simulation. Eigenmode and S-parameter analyses show that the 2cm long slow wave structure (SWS) has 1-5dB insertion loss over the passband (TM31 mode) with ~28% cold bandwidth. Analytic gain calculation indicates that in the SWS, TM31-mode is amplified with 15–20 dB/beam at 64–84GHz with three elliptical beams of 10kV and 150mA/beam, which was compared with particle-in-cell (PIC) simulations. PIC analysis on the analysis of instability with zero-input driving excitations demonstrated that background noises and non-operating lower order modes are noticeably suppressed by implanting equidistant dielectric absorbers; the overmoded structure only allowed the desired 3rd order mode to propagate in the structure. The designed circuit structure can be widely applied to multi-beam devices for high power RF generation.

  4. Consent Order Update

    Broader source: Energy.gov [DOE]

    At the September 24, 2014 Board meeting Pete Maggiore DOE, Provided Information on the Consent Order Work that Needs to be Completed. Information on the Fiscal Year Work Plan was also Provided.

  5. Analysis and comparison of CVS-ADC approaches up to third order for the calculation of core-excited states

    SciTech Connect (OSTI)

    Wenzel, Jan Holzer, Andre; Wormit, Michael; Dreuw, Andreas

    2015-06-07

    The extended second order algebraic-diagrammatic construction (ADC(2)-x) scheme for the polarization operator in combination with core-valence separation (CVS) approximation is well known to be a powerful quantum chemical method for the calculation of core-excited states and the description of X-ray absorption spectra. For the first time, the implementation and results of the third order approach CVS-ADC(3) are reported. Therefore, the CVS approximation has been applied to the ADC(3) working equations and the resulting terms have been implemented efficiently in the adcman program. By treating the α and β spins separately from each other, the unrestricted variant CVS-UADC(3) for the treatment of open-shell systems has been implemented as well. The performance and accuracy of the CVS-ADC(3) method are demonstrated with respect to a set of small and middle-sized organic molecules. Therefore, the results obtained at the CVS-ADC(3) level are compared with CVS-ADC(2)-x values as well as experimental data by calculating complete basis set limits. The influence of basis sets is further investigated by employing a large set of different basis sets. Besides the accuracy of core-excitation energies and oscillator strengths, the importance of cartesian basis functions and the treatment of orbital relaxation effects are analyzed in this work as well as computational timings. It turns out that at the CVS-ADC(3) level, the results are not further improved compared to CVS-ADC(2)-x and experimental data, because the fortuitous error compensation inherent in the CVS-ADC(2)-x approach is broken. While CVS-ADC(3) overestimates the core excitation energies on average by 0.61% ± 0.31%, CVS-ADC(2)-x provides an averaged underestimation of −0.22% ± 0.12%. Eventually, the best agreement with experiments can be achieved using the CVS-ADC(2)-x method in combination with a diffuse cartesian basis set at least at the triple-ζ level.

  6. ARM - Engineering Work Request & Engineering Work Order Guidelines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The conclusion, upon completion of the ECO, in most cases will result in a revision to the operational ARM baseline (Baseline Change Request or BCR). In addition, as a complement ...

  7. Quantum Monte Carlo analysis of a charge ordered insulating antiferromagnet: The Ti4O7 Magneli phase

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Benali, Anouar; Shulenburger, Luke; Krogel, Jaron T.; Zhong, Xiaoling; Kent, Paul R. C.; Heinonen, Olle

    2016-06-07

    The Magneli phase Ti4O7 is an important transition metal oxide with a wide range of applications because of its interplay between charge, spin, and lattice degrees of freedom. At low temperatures, it has non-trivial magnetic states very close in energy, driven by electronic exchange and correlation interactions. We have examined three low- lying states, one ferromagnetic and two antiferromagnetic, and calculated their energies as well as Ti spin moment distributions using highly accurate Quantum Monte Carlo methods. We compare our results to those obtained from density functional theory- based methods that include approximate corrections for exchange and correlation. Our resultsmore » confirm the nature of the states and their ordering in energy, as compared with density-functional theory methods. However, the energy differences and spin distributions differ. Here, a detailed analysis suggests that non-local exchange-correlation functionals, in addition to other approximations such as LDA+U to account for correlations, are needed to simultaneously obtain better estimates for spin moments, distributions, energy differences and energy gaps.« less

  8. Ordering Information

    Gasoline and Diesel Fuel Update (EIA)

    coal industry Natural gas trade (Table 4.3) Ordering Information This publication and other Energy Information Administration (EIA) publications may be purchased from the...

  9. Hawaii Clean Energy Initiative (HCEI) Scenario Analysis: Quantitative Estimates Used to Facilitate Working Group Discussions (2008-2010)

    SciTech Connect (OSTI)

    Braccio, R.; Finch, P.; Frazier, R.

    2012-03-01

    This report provides details on the Hawaii Clean Energy Initiative (HCEI) Scenario Analysis to identify potential policy options and evaluate their impact on reaching the 70% HECI goal, present possible pathways to attain the goal based on currently available technology, with an eye to initiatives under way in Hawaii, and provide an 'order-of-magnitude' cost estimate and a jump-start to action that would be adjusted with a better understanding of the technologies and market.

  10. Administering Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-14

    The order provides requirements and responsibilities for administering work force discipline and corrective actions. Supersedes DOE O 3750.1.

  11. Work Domain Analysis of a Predecessor Sodium-cooled Reactor as Baseline for AdvSMR Operational Concepts

    SciTech Connect (OSTI)

    Ronald Farris; David Gertman; Jacques Hugo

    2014-03-01

    This report presents the results of the Work Domain Analysis for the Experimental Breeder Reactor (EBR-II). This is part of the phase of the research designed to incorporate Cognitive Work Analysis in the development of a framework for the formalization of an Operational Concept (OpsCon) for Advanced Small Modular Reactors (AdvSMRs). For a new AdvSMR design, information obtained through Cognitive Work Analysis, combined with human performance criteria, can and should be used in during the operational phase of a plant to assess the crew performance aspects associated with identified AdvSMR operational concepts. The main objective of this phase was to develop an analytical and descriptive framework that will help systems and human factors engineers to understand the design and operational requirements of the emerging generation of small, advanced, multi-modular reactors. Using EBR-II as a predecessor to emerging sodium-cooled reactor designs required the application of a method suitable to the structured and systematic analysis of the plant to assist in identifying key features of the work associated with it and to clarify the operational and other constraints. The analysis included the identification and description of operating scenarios that were considered characteristic of this type of nuclear power plant. This is an invaluable aspect of Operational Concept development since it typically reveals aspects of future plant configurations that will have an impact on operations. These include, for example, the effect of core design, different coolants, reactor-to-power conversion unit ratios, modular plant layout, modular versus central control rooms, plant siting, and many more. Multi-modular plants in particular are expected to have a significant impact on overall OpsCon in general, and human performance in particular. To support unconventional modes of operation, the modern control room of a multi-module plant would typically require advanced HSIs that would

  12. 1982 Orders

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOCKET FE CITE DATE NUMBER APPLICANT NAME ORDER NO. 70116.ERA 121482 82-04-LNG PhillipsMarathon 49 70552.ERA 113082 82-09-NG Northern Natural Gas 48 70541.ERA 110182...

  13. Directives System Order

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-10-16

    The order prescribes the process for development of Policy Statements, Orders, Notices, Manuals and Guides, which are intended to guide, inform, and instruct employees in the performance of their jobs, and enable them to work effectively within the Department and with agencies, contractors, and the public.

  14. RISMC advanced safety analysis working plan: FY2015 - FY2019. Light Water Reactor Sustainability Program

    SciTech Connect (OSTI)

    Szilard, Ronaldo H; Smith, Curtis L

    2014-09-01

    In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: (1) A value proposition (“why is this important?”) that will make the case for stakeholder’s use of the ASAP research and development (R&D) products; (2) An identification of likely end users and pathway to adoption of enhanced tools by the end-users; (3) A proposed set of practical and achievable “use case” demonstrations; (4) A proposed plan to address ASAP verification and validation (V&V) needs; and (5) A proposed schedule for the multi-year ASAP.

  15. Analysis of axial-induction-based wind plant control using an engineering and a high-order wind plant model

    SciTech Connect (OSTI)

    Annoni, Jennifer; Gebraad, Pieter M. O.; Scholbrock, Andrew K.; Fleming, Paul A.; Wingerden, Jan-Willem van

    2015-08-14

    Wind turbines are typically operated to maximize their performance without considering the impact of wake effects on nearby turbines. Wind plant control concepts aim to increase overall wind plant performance by coordinating the operation of the turbines. This paper focuses on axial-induction-based wind plant control techniques, in which the generator torque or blade pitch degrees of freedom of the wind turbines are adjusted. The paper addresses discrepancies between a high-order wind plant model and an engineering wind plant model. Changes in the engineering model are proposed to better capture the effects of axial-induction-based control shown in the high-order model.

  16. Analysis of first order reversal curves in the thermal hysteresis of spin-crossover nanoparticles within the mechanoelastic model

    SciTech Connect (OSTI)

    Stoleriu, Laurentiu E-mail: cristian.enachescu@uaic.ro; Stancu, Alexandru; Enachescu, Cristian E-mail: cristian.enachescu@uaic.ro; Chakraborty, Pradip; Hauser, Andreas

    2015-05-07

    The recently obtained spin-crossover nanoparticles are possible candidates for applications in the recording media industry as materials for data storage, or as pressure and temperature sensors. For these applications, the intermolecular interactions and interactions between spin-crossover nanoparticles are extremely important, as they may be essential factors in triggering the transition between the two stable phases: the high-spin and low-spin ones. In order to find correlations between the distributions in size and interactions and the transition temperatures distribution, we apply the FORC (First Order Reversal Curves) method, using simulations based on a mechanoelastic model applied to 2D triangular lattices composed of molecules linked by springs and embedded in a surfactant. We consider two Gaussian distributions: one is the size of the nanoparticles and another is the elastic interactions between edge spin-crossover molecules and the surfactant molecules. In order to disentangle the kinetic and non-kinetic parts of the FORC distributions, we compare the results obtained for different temperature sweeping rates. We also show that the presence of few larger particles in a distribution centered around much smaller particles dramatically increases the hysteresis width.

  17. Surfactant/detergent titration analysis method and apparatus for machine working fluids, surfactant-containing wastewater and the like

    DOE Patents [OSTI]

    Smith, Douglas D.; Hiller, John M.

    1998-01-01

    The present invention is an improved method and related apparatus for quantitatively analyzing machine working fluids and other aqueous compositions such as wastewater which contain various mixtures of cationic, neutral, and/or anionic surfactants, soluble soaps, and the like. The method utilizes a single-phase, non-aqueous, reactive titration composition containing water insoluble bismuth nitrate dissolved in glycerol for the titration reactant. The chemical reaction of the bismuth ion and glycerol with the surfactant in the test solutions results in formation of micelles, changes in micelle size, and the formation of insoluble bismuth soaps. These soaps are quantified by physical and chemical changes in the aqueous test solution. Both classical potentiometric analysis and turbidity measurements have been used as sensing techniques to determine the quantity of surfactant present in test solutions. This method is amenable to the analysis of various types of new, in-use, dirty or decomposed surfactants and detergents. It is a quick and efficient method utilizing a single-phase reaction without needing a separate extraction from the aqueous solution. It is adaptable to automated control with simple and reliable sensing methods. The method is applicable to a variety of compositions with concentrations from about 1% to about 10% weight. It is also applicable to the analysis of waste water containing surfactants with appropriate pre-treatments for concentration.

  18. Surfactant/detergent titration analysis method and apparatus for machine working fluids, surfactant-containing wastewater and the like

    DOE Patents [OSTI]

    Smith, D.D.; Hiller, J.M.

    1998-02-24

    The present invention is an improved method and related apparatus for quantitatively analyzing machine working fluids and other aqueous compositions such as wastewater which contain various mixtures of cationic, neutral, and/or anionic surfactants, soluble soaps, and the like. The method utilizes a single-phase, non-aqueous, reactive titration composition containing water insoluble bismuth nitrate dissolved in glycerol for the titration reactant. The chemical reaction of the bismuth ion and glycerol with the surfactant in the test solutions results in formation of micelles, changes in micelle size, and the formation of insoluble bismuth soaps. These soaps are quantified by physical and chemical changes in the aqueous test solution. Both classical potentiometric analysis and turbidity measurements have been used as sensing techniques to determine the quantity of surfactant present in test solutions. This method is amenable to the analysis of various types of new, in-use, dirty or decomposed surfactants and detergents. It is a quick and efficient method utilizing a single-phase reaction without needing a separate extraction from the aqueous solution. It is adaptable to automated control with simple and reliable sensing methods. The method is applicable to a variety of compositions with concentrations from about 1% to about 10% weight. It is also applicable to the analysis of waste water containing surfactants with appropriate pre-treatments for concentration. 1 fig.

  19. Work Authorization System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Authorization System Work Authorization System PDF icon Work Authorization System More Documents & Publications Policy Flash 2014-30 DOE Order 412.1a, Work Authorization ...

  20. Philadelphia gas works medium-Btu coal gasification project: capital and operating cost estimate, financial/legal analysis, project implementation

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    This volume of the final report is a compilation of the estimated capital and operating costs for the project. Using the definitive design as a basis, capital and operating costs were developed by obtaining quotations for equipment delivered to the site. Tables 1.1 and 1.2 provide a summary of the capital and operating costs estimated for the PGW Coal Gasification Project. In the course of its Phase I Feasibility Study of a medium-Btu coal-gas facility, Philadelphia Gas Works (PGW) identified the financing mechanism as having great impact on gas cost. Consequently, PGW formed a Financial/Legal Task Force composed of legal, financial, and project analysis specialists to study various ownership/management options. In seeking an acceptable ownership, management, and financing arrangement, certain ownership forms were initially identified and classified. Several public ownership, private ownership, and third party ownership options for the coal-gas plant are presented. The ownership and financing forms classified as base alternatives involved tax-exempt and taxable financing arrangements and are discussed in Section 3. Project implementation would be initiated by effectively planning the methodology by which commercial operation will be realized. Areas covered in this report are sale of gas to customers, arrangements for feedstock supply and by-product disposal, a schedule of major events leading to commercialization, and a plan for managing the implementation.

  1. Policy Perspective: Meeting the Challenge of the DOE Order 436.1 Departmental Sustainability - 12527

    SciTech Connect (OSTI)

    MacDonald, Jennifer C.

    2012-07-01

    DOE's Sustainability Performance Office is working to meet sustainability goals at DOE by implementing Executive Orders, Departmental policy, the DOE Strategic Sustainability Performance Plan (SSPP) and legislation related to sustainability. Through implementation of Executive Orders, Departmental policy, the SSPP, statutory requirements and regular reporting, analysis and communication, DOE's SPO is working to maintain and expand DOE's leadership in sustainability. (authors)

  2. Harrington: Order (2014-SW-28011)

    Broader source: Energy.gov [DOE]

    DOE ordered Harrington Brass Works to pay a $10,000 civil penalty after finding Harrington had manufactured and distributed in commerce in the U.S. 832 units of individual model 20-210-026, a noncompliant faucet.

  3. Application of principal component analysis (PCA) and improved joint probability distributions to the inverse first-order reliability method (I-FORM) for predicting extreme sea states

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Eckert-Gallup, Aubrey C.; Sallaberry, Cédric J.; Dallman, Ann R.; Neary, Vincent S.

    2016-01-06

    Environmental contours describing extreme sea states are generated as the input for numerical or physical model simulations as a part of the standard current practice for designing marine structures to survive extreme sea states. These environmental contours are characterized by combinations of significant wave height (Hs) and either energy period (Te) or peak period (Tp) values calculated for a given recurrence interval using a set of data based on hindcast simulations or buoy observations over a sufficient period of record. The use of the inverse first-order reliability method (I-FORM) is a standard design practice for generating environmental contours. This papermore » develops enhanced methodologies for data analysis prior to the application of the I-FORM, including the use of principal component analysis (PCA) to create an uncorrelated representation of the variables under consideration as well as new distribution and parameter fitting techniques. As a result, these modifications better represent the measured data and, therefore, should contribute to the development of more realistic representations of environmental contours of extreme sea states for determining design loads for marine structures.« less

  4. DOE Order on Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Health, Safety and Security U.S. Department of Energy ORDER Washington, D.C. Approved: 4-25-2011 SUBJECT: QUALITY ASSURANCE 1. PURPOSE. a. To ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. b. To achieve quality for all work based upon the following principles: (1) All work, as defined in this Order,

  5. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  6. Albany/FELIX: A parallel, scalable and robust, finite element, first-order Stokes approximation ice sheet solver built for advanced analysis

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Tezaur, I. K.; Perego, M.; Salinger, A. G.; Tuminaro, R. S.; Price, S. F.

    2015-04-27

    This paper describes a new parallel, scalable and robust finite element based solver for the first-order Stokes momentum balance equations for ice flow. The solver, known as Albany/FELIX, is constructed using the component-based approach to building application codes, in which mature, modular libraries developed as a part of the Trilinos project are combined using abstract interfaces and template-based generic programming, resulting in a final code with access to dozens of algorithmic and advanced analysis capabilities. Following an overview of the relevant partial differential equations and boundary conditions, the numerical methods chosen to discretize the ice flow equations are described, alongmore » with their implementation. The results of several verification studies of the model accuracy are presented using (1) new test cases for simplified two-dimensional (2-D) versions of the governing equations derived using the method of manufactured solutions, and (2) canonical ice sheet modeling benchmarks. Model accuracy and convergence with respect to mesh resolution are then studied on problems involving a realistic Greenland ice sheet geometry discretized using hexahedral and tetrahedral meshes. Also explored as a part of this study is the effect of vertical mesh resolution on the solution accuracy and solver performance. The robustness and scalability of our solver on these problems is demonstrated. Lastly, we show that good scalability can be achieved by preconditioning the iterative linear solver using a new algebraic multilevel preconditioner, constructed based on the idea of semi-coarsening.« less

  7. Albany/FELIX: A parallel, scalable and robust, finite element, first-order Stokes approximation ice sheet solver built for advanced analysis

    SciTech Connect (OSTI)

    Tezaur, I. K.; Perego, M.; Salinger, A. G.; Tuminaro, R. S.; Price, S. F.

    2015-04-27

    This paper describes a new parallel, scalable and robust finite element based solver for the first-order Stokes momentum balance equations for ice flow. The solver, known as Albany/FELIX, is constructed using the component-based approach to building application codes, in which mature, modular libraries developed as a part of the Trilinos project are combined using abstract interfaces and template-based generic programming, resulting in a final code with access to dozens of algorithmic and advanced analysis capabilities. Following an overview of the relevant partial differential equations and boundary conditions, the numerical methods chosen to discretize the ice flow equations are described, along with their implementation. The results of several verification studies of the model accuracy are presented using (1) new test cases for simplified two-dimensional (2-D) versions of the governing equations derived using the method of manufactured solutions, and (2) canonical ice sheet modeling benchmarks. Model accuracy and convergence with respect to mesh resolution are then studied on problems involving a realistic Greenland ice sheet geometry discretized using hexahedral and tetrahedral meshes. Also explored as a part of this study is the effect of vertical mesh resolution on the solution accuracy and solver performance. The robustness and scalability of our solver on these problems is demonstrated. Lastly, we show that good scalability can be achieved by preconditioning the iterative linear solver using a new algebraic multilevel preconditioner, constructed based on the idea of semi-coarsening.

  8. Surface structure determinations of ordered sulfur overlayers on Mo(100) and Re(0001) by low-energy electron diffraction intensity analysis

    SciTech Connect (OSTI)

    Jentz, D.W.

    1992-11-01

    A newly developed method for surface structure determination, tensor LEED, combined with automated search was used to analyze the structures. The ordered structures of S on Mo(100) which were studied formed a c(2 {times} 2), c(4 {times} 2), and p(2 {times} l) periodicities at coverages of 0.5, 0.75, 1.0 ML (monolayers, of one sulfur atom per one molybdenum atom) respectively. A MO{sub 2}S-like overlayer, which formed at coverages greater than 1.0 ML, is also discussed. Calculations for the c(2 {times} 2) structure gave a best fit geometry with S adsorbed in a four-fold symmetric hollow site and the second layer buckled by 0.09{Angstrom}. The S-Mo bond length is 2.45{Angstrom} and the Pendry R-factor is 0.21. Preliminary calculations for the c(4 {times} 2) structure did not yield an acceptable fit. The three models tried are discussed. Calculations for p(2 {times} l) data did not yield an acceptable geometry either. The types of models that were tried are discussed. Implications of this analysis are discussed along with results of a scanning tunneling microscopy (STM) investigation. The ordered structures on the RE(0001) surface studied have p(2 {times} 2) and (2{radical}3 {times} 2{radical}3)R30{degree} periodicities and occurred at S coverages of 0.25 and 0.5 ML respectively. Best fit structure for p(2 {times} 2) structure has S adsorbed in a three-fold hollow hcp site and exhibits a buckling of the first and second Re layers. The first layer is buckled by 0.05{Angstrom} and the second layer is buckled by 0.06{Angstrom}. Re-S bond length is 2.32{Angstrom} and Pendry R-factor is 0.21. Preliminary results of dynamical LEED investigation of (2{radical}3 {times} 2{radical}3)R30{degree} structure show reasonable agreement with a model with a 6-S atom basis.

  9. Microstructural study and densification analysis of hot work tool steel matrix composites reinforced with TiB{sub 2} particles

    SciTech Connect (OSTI)

    Fedrizzi, A.; Pellizzari, M.; Zadra, M.; Marin, E.

    2013-12-15

    Hot work tool steels are characterized by good toughness and high hot hardness but are less wear resistant than other tooling materials, such as high speed steel. Metal matrix composites show improved tribological behavior, but not much work has been done in the field of hot work tool steels. In this paper TiB{sub 2}-reinforced hot work tool steel matrix composites were produced by spark plasma sintering (SPS). Mechanical alloying (MA) was proposed as a suited process to improve the composite microstructure. Density measurements and microstructure confirmed that MA promotes sintering and produces a fine and homogeneous dispersion of reinforcing particles. X-ray diffraction patterns of the sintered composites highlighted the formation of equilibrium Fe{sub 2}B and TiC, as predicted by thermodynamic calculations using Thermo-Calc® software. Scanning electron microscopy as well as scanning Kelvin probe force microscopy highlighted the reaction of the steel matrix with TiB{sub 2} particles, showing the formation of a reaction layer at the TiB{sub 2}-steel interface. Phase investigations pointed out that TiB{sub 2} is not chemically stable in steel matrix because of the presence of carbon even during short time SPS. - Highlights: • TiB{sub 2} reinforced steel matrix composites were produced by spark plasma sintering. • TiB{sub 2} was successfully dispersed in the steel matrix by mechanical alloying. • Steel and TiB{sub 2} react during sintering forming equilibrium Fe{sub 2}B and TiC. • The new phases were investigated by means of AFM, Volta potential and XRD analyses.

  10. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    At DOE Working At DOE Working At DOE Only Here...Will you Define the Future of Energy The people of DOE are engaged in a wide range of challenging and innovative work - from participating in groundbreaking international initiatives like the Global Nuclear Partnership, to solar power demonstration projects, to projects that convert captured carbon dioxide (CO2) emissions from industrial sources into fuel, plastics, and fertilizers. Only here can the diversity of activities throughout our

  11. Analysis of the working process and mechanical losses in a Stirling engine for a solar power unit

    SciTech Connect (OSTI)

    Makhkamov, K.K.; Ingham, D.B.

    1999-05-01

    In this paper a second level mathematical model for the computational simulation of the working process of a 1-kW Stirling engine has been used and the results obtained are presented. The internal circuit of the engine in the calculation scheme was divided into five chambers, namely, the expansion space, heater, regenerator, cooler and the compression space, and the governing system of ordinary differential equations for the energy and mass conservation were solved in each chamber by Euler`s method. In addition, mechanical losses in the construction of the engine have been determined and the computational results show that the mechanical losses for this particular design of the Stirling engine may be up to 50% of the indicated power of the engine.

  12. President Truman Orders Development of Thermonuclear Weapon ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline President Truman Orders Development of Thermonuclear Weapon...

  13. Microsoft Word - Wind Industry Work Order Information Flow Survey...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... summarizes the findings of a preliminary survey of wind turbine maintenance management. ... With current mobile technology CMMS can solve many of the challenges associated with ...

  14. Strategic Initiatives Work Group

    Broader source: Energy.gov [DOE]

    The Work Group, comprised of members representing DOE, contractor and worker representatives, provides a forum for information sharing; data collection and analysis; as well as, identifying best practices and initiatives to enhance safety performance and safety culture across the Complex.

  15. Polymers with increased order

    DOE Patents [OSTI]

    Sawan, Samuel P.; Talhi, Abdelhafid; Taylor, Craig M.

    1998-08-25

    The invention features polymers with increased order, and methods of making them featuring a dense gas.

  16. Implementing Executive Order 13423

    Broader source: Energy.gov [DOE]

    Guide describes the instructions on the requirements and how fleets should implement the Executive Order 13423.

  17. Compliance Order on Consent

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Compliance Order on Consent Compliance Order on Consent The Compliance Order on Consent provides the requirements for environmental cleanup of hazardous constituents for LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email What is the Compliance Order on Consent? The Compliance Order on Consent between the State of New Mexico Environment Department and the United States Department of Energy and Los Alamos National

  18. Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1983-03-23

    The order provides guidance and procedures and states responsibilities for maintaining work force discipline in DOE. Chg 1, dated 3-11-85; Chg 2, dated 1-6-86; Chg 3, dated 3-21-89; Chg 4, dated 8-2-90; Chg 5, dated 3-9-92; Chg 6, dated 8-21-92, cancels Chg 5.

  19. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Effective Date: 02/03/14 WP 12-IS.01-6 Revision 11 Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls Cognizant Section: Industrial Safety/Industrial Hygiene Approved By: Tom Ferguson Working Copy Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls WP 12-IS.01-6, Rev. 11 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 7 ACRONYMS AND

  20. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/WIPP-99-2286 Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan Revision 7 U.S. Department of Energy December 2013 This document supersedes DOE/WIPP-99-2286, Rev. 6. Working Copy Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan DOE/WIPP-99-2286, Rev. 7 2 TABLE OF CONTENTSCHANGE HISTORY SUMMARY .............................................. 3 ACRONYMS AND ABBREVIATIONS

  1. U.S. Department of Energy Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy Order U.S. Department of Energy Order WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) U.S. Department of Energy Order (52.16 KB) More Documents & Publications DOE M 481.1-1A DOE O 481.1C, WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) Work for Others Program Interagency Work

  2. Consent Order public meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Consent Order public meeting Consent Order public meeting WHEN: Apr 28, 2016 5:00 PM - 7:00 PM WHERE: Los Alamos County Council Chambers CATEGORY: Community TYPE: Meeting INTERNAL: Calendar Login Event Description On March 1, 2005, NMED, the Department of Energy (DOE) and the Regents of the University of California entered into the 2005 Consent Order that prescribed fence-to-fence cleanup requirements for the Laboratory. The public comment period on the Consent Order closes May 16, 2016

  3. Hybrid reduced order modeling for assembly calculations

    SciTech Connect (OSTI)

    Bang, Y.; Abdel-Khalik, H. S.; Jessee, M. A.; Mertyurek, U.

    2013-07-01

    While the accuracy of assembly calculations has considerably improved due to the increase in computer power enabling more refined description of the phase space and use of more sophisticated numerical algorithms, the computational cost continues to increase which limits the full utilization of their effectiveness for routine engineering analysis. Reduced order modeling is a mathematical vehicle that scales down the dimensionality of large-scale numerical problems to enable their repeated executions on small computing environment, often available to end users. This is done by capturing the most dominant underlying relationships between the model's inputs and outputs. Previous works demonstrated the use of the reduced order modeling for a single physics code, such as a radiation transport calculation. This manuscript extends those works to coupled code systems as currently employed in assembly calculations. Numerical tests are conducted using realistic SCALE assembly models with resonance self-shielding, neutron transport, and nuclides transmutation/depletion models representing the components of the coupled code system. (authors)

  4. HSI Tape Ordering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tape Ordering HSI Tape Ordering General Procedure If you are retrieving multiple files from HPSS, it is best to order your retrieval requests in a way that makes sense for the HPSS system. In HPSS, files initially go onto a disk cache and migrate to tape as time passes. This means that files that were put into HPSS at the same time could end up spread across multiple tapes. Since each tape must by loaded into the reader, it will be fastest if you order your requests so that you are pulling all

  5. Prizer-Painter: Order (2014-CE-23005)

    Broader source: Energy.gov [DOE]

    DOE ordered Prizer-Painter Stove Works, Inc. to pay a $8,000 civil penalty after finding Prizer-Painter had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  6. NEW - DOE O 333.1, Administering Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order provides requirements and responsibilities for administering work force discipline and corrective actions.

  7. URS Consent Order

    Office of Environmental Management (EM)

    ... requires the written consent of both Parties. 10. URS waives any and all rights to appeal or otherwise seek judicial or administrative review of the terms of this Consent Order. ...

  8. Physics Division Work Planning Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  9. Order 13287, Preserve America

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 In response to requirements of Executive Order 13287, Preserve America Office of History and Heritage Resources Office of the Executive Secretariat U.S. Department of Energy September 2014 An Assessment of Historic Properties and Preservation Activities at the U.S. Department of Energy Table of Contents Introduction ............................................................................................................................................ 3 Part I. Background and Overview

  10. Determining Reduced Order Models for Optimal Stochastic Reduced Order Models

    SciTech Connect (OSTI)

    Bonney, Matthew S.; Brake, Matthew R.W.

    2015-08-01

    The use of parameterized reduced order models(PROMs) within the stochastic reduced order model (SROM) framework is a logical progression for both methods. In this report, five different parameterized reduced order models are selected and critiqued against the other models along with truth model for the example of the Brake-Reuss beam. The models are: a Taylor series using finite difference, a proper orthogonal decomposition of the the output, a Craig-Bampton representation of the model, a method that uses Hyper-Dual numbers to determine the sensitivities, and a Meta-Model method that uses the Hyper-Dual results and constructs a polynomial curve to better represent the output data. The methods are compared against a parameter sweep and a distribution propagation where the first four statistical moments are used as a comparison. Each method produces very accurate results with the Craig-Bampton reduction having the least accurate results. The models are also compared based on time requirements for the evaluation of each model where the Meta- Model requires the least amount of time for computation by a significant amount. Each of the five models provided accurate results in a reasonable time frame. The determination of which model to use is dependent on the availability of the high-fidelity model and how many evaluations can be performed. Analysis of the output distribution is examined by using a large Monte-Carlo simulation along with a reduced simulation using Latin Hypercube and the stochastic reduced order model sampling technique. Both techniques produced accurate results. The stochastic reduced order modeling technique produced less error when compared to an exhaustive sampling for the majority of methods.

  11. NMED Consent Order

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    begins environmental sampling in townsite September 25, 2008 Vicinity of Upper LA Canyon Investigated as Part of NMED Consent Order LOS ALAMOS, New Mexico, September 25, 2008-Environmental sampling, conducted on behalf of Los Alamos National Laboratory in the town of Los Alamos near upper Los Alamos Canyon, has begun. Known as the Upper Los Alamos Canyon Project, this effort is an environmental assessment of areas that have been or could have been affected by Laboratory operations from the days

  12. High Order Seismic Simulations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Order Seismic Simulations on the Intel Xeon Phi Processor (Knights Landing) Alexander Heinecke 1 , Alexander Breuer 2 , Michael Bader 3 , and Pradeep Dubey 1 1 Intel Corporation, 2200 Mission College Blvd., Santa Clara 95054, CA, USA 2 University of California, San Diego, 9500 Gilman Dr., La Jolla 92093, CA, USA 3 Technische Universit¨ at M¨ unchen, Boltzmannstr. 3, D-85748 Garching, Germany Abstract. We present a holistic optimization of the ADER-DG finite element software SeisSol targeting

  13. Two variants of minimum discarded fill ordering

    SciTech Connect (OSTI)

    D'Azevedo, E.F. ); Forsyth, P.A.; Tang, Wei-Pai . Dept. of Computer Science)

    1991-01-01

    It is well known that the ordering of the unknowns can have a significant effect on the convergence of Preconditioned Conjugate Gradient (PCG) methods. There has been considerable experimental work on the effects of ordering for regular finite difference problems. In many cases, good results have been obtained with preconditioners based on diagonal, spiral or natural row orderings. However, for finite element problems having unstructured grids or grids generated by a local refinement approach, it is difficult to define many of the orderings for more regular problems. A recently proposed Minimum Discarded Fill (MDF) ordering technique is effective in finding high quality Incomplete LU (ILU) preconditioners, especially for problems arising from unstructured finite element grids. Testing indicates this algorithm can identify a rather complicated physical structure in an anisotropic problem and orders the unknowns in the preferred'' direction. The MDF technique may be viewed as the numerical analogue of the minimum deficiency algorithm in sparse matrix technology. At any stage of the partial elimination, the MDF technique chooses the next pivot node so as to minimize the amount of discarded fill. In this work, two efficient variants of the MDF technique are explored to produce cost-effective high-order ILU preconditioners. The Threshold MDF orderings combine MDF ideas with drop tolerance techniques to identify the sparsity pattern in the ILU preconditioners. These techniques identify an ordering that encourages fast decay of the entries in the ILU factorization. The Minimum Update Matrix (MUM) ordering technique is a simplification of the MDF ordering and is closely related to the minimum degree algorithm. The MUM ordering is especially for large problems arising from Navier-Stokes problems. Some interesting pictures of the orderings are presented using a visualization tool. 22 refs., 4 figs., 7 tabs.

  14. Working Group Presentation for Discussion

    U.S. Energy Information Administration (EIA) Indexed Site

    1, 2016 MEMORANDUM FOR: IAN MEAD ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS PAUL HOLTBERG TEAM LEADER ANALYSIS INTEGRATION TEAM JIM TURNURE DIRECTOR OFFICE OF ENERGY CONSUMPTION AND EFFICIENCY ANALYSIS FROM: TRANSPORTATION CONSUMPTION AND EFFICIENCY ANALYSIS TEAM SUBJECT: Annual Energy Outlook (AEO)2017 Transportation Working Group Meeting Summary (presented on 08-31-2016) Attendees: David Daniels (EIA) Mindi Farber-DeAnda (EIA) Devi Mishra (EIA) Alicia Birky (Energetics) Sarah Garman (DOE)

  15. Facilities removal working group

    SciTech Connect (OSTI)

    1997-03-01

    This working group`s first objective is to identify major economic, technical, and regulatory constraints on operator practices and decisions relevant to offshore facilities removal. Then, the group will try to make recommendations as to regulatory and policy adjustments, additional research, or process improvements and/or technological advances, that may be needed to improve the efficiency and effectiveness of the removal process. The working group will focus primarily on issues dealing with Gulf of Mexico platform abandonments. In order to make the working group sessions as productive as possible, the Facilities Removal Working Group will focus on three topics that address a majority of the concerns and/or constraints relevant to facilities removal. The three areas are: (1) Explosive Severing and its Impact on Marine Life, (2) Pile and Conductor Severing, and (3) Deep Water Abandonments This paper will outline the current state of practice in the offshore industry, identifying current regulations and specific issues encountered when addressing each of the three main topics above. The intent of the paper is to highlight potential issues for panel discussion, not to provide a detailed review of all data relevant to the topic. Before each panel discussion, key speakers will review data and information to facilitate development and discussion of the main issues of each topic. Please refer to the attached agenda for the workshop format, key speakers, presentation topics, and panel participants. The goal of the panel discussions is to identify key issues for each of the three topics above. The working group will also make recommendations on how to proceed on these key issues.

  16. Summary of the Special Analysis of Savannah River Depleted Uranium Trioxide Demonstrating the Before and After Impacts on the DOE Order 435.1 Performance Objective and the Peak Dose

    SciTech Connect (OSTI)

    Shott, G.J.

    2011-01-15

    This report summarizes the special analysis (SA) of the Savannah River Depleted Uranium Trioxide waste stream (SVRSURANIUM03, Revision 1) demonstrating the before and after impacts of the waste stream to the DOE Order 435.1 performance objective at the disposal facility, and the peak dose. The Nevada Division of Environmental Protection (NDEP) requested this SA and asked the Nevada Site Office (NSO) to run the SA deterministically and assume that all the model conditions remain the same regardless of the length of time to the peak dose. Although the NDEP accepts that DOE Order 435.1 requires a compliance period of 1,000 years, it also requested to know what year, if any, the specific DOE performance objectives will be exceeded. Given the NDEP’s requested model conditions, the SA demonstrates the Rn-222 peak dose will occur in about 2 million years and will exceed the performance objective in about 6,000 years. The 0.25 mSv y-1 all-pathway performance objective was not exceeded for the resident scenario after reaching the 4 million year peak dose.

  17. Submitting Work | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Submitting Work Customers may directly contact the supervisor of the required service area to discuss the technical details of proposed projects. Iowa State University requestors need to bring an Intramural Purchase Order (IPO) with them from their departmental office to request services. After the technical details of the project are known, a cost estimate is prepared. Ames Laboratory operations work less than $1,000 is submitted directly to the shop using the Engineering Services Shop -

  18. Idaho Crews Use Waste Treatment Expertise to Land Additional Work |

    Office of Environmental Management (EM)

    Management Human Capital Management The strategic management of human capital requires comprehensive planning and analysis in order to develop, implement, and evaluate programs that support every facet of employee work life. DOE human capital initiatives are designed to support continuous improvement and accountability in accordance with the DOE Human Capital Management Accountability Program (HCMAP), which is an internal DOE audit process of servicing human resources offices and addresses those

  19. Paperclips Etc. Special Order Form

    Energy Savers [EERE]

    ...... Date: ... ALL SPECIAL ORDERS ARE SUBJECT TO FULL PAYMENT OR A RESTOCKING FEE WHEN ITEMS ORDERED ARE RETURNED TO THE SUPPLIER DUE TO THE ...

  20. High tunability of the work function of (001) surface of ReO{sub 3} with O-vacancies: First principles analysis

    SciTech Connect (OSTI)

    Suchitra; Pan, Jaysree; Waghmare, Umesh V.

    2014-07-21

    Physical and chemical properties of transition metal oxides are central to the emerging field of oxide electronics. However, they are greatly influenced by defects, particularly, oxygen vacancies, which are always present in oxides. Here, we show how the control of oxygen vacancies at (001) surface of ReO{sub 3} can be used to tune its work function from 7 to 3?eV, based on first-principles density functional theoretical calculations of its structure, electronic and magnetic properties. The work function is shown to correlate directly with the stability of surface and exhibit a linear dependence on surface energy. We further assess the stability of ReO{sub 3} surface by determining its phonon dispersion, and explain how the surface stresses effectively strengthen structural instability leading to size dependence of its pressure dependent structural phase transitions observed experimentally. Our results highlight how significantly oxygen vacancies alter the work function of a metallic oxide and has important consequences to development of electronic devices and catalysts based on oxide heterostructures.

  1. 3D Charge Order Found in Superconductor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3D Charge Order Found in Superconductor 3D Charge Order Found in Superconductor Print Wednesday, 08 June 2016 00:00 Despite 30 years of intense study, the explanation behind the zero-resistance current displayed by high-temperature superconductors (HTSCs) is still shrouded in complexity. HTSCs tend to be heterogeneous materials with multiple phases, and disentangling their various electronic behaviors for analysis can be difficult. At the ALS, researchers used resonant soft x-ray diffraction

  2. Executive Order 13423 Implementing Instructions

    Broader source: Energy.gov [DOE]

    INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423“Strengthening Federal Environmental, Energy, and Transportation Management”

  3. AEO2016 Electricity Working Group

    U.S. Energy Information Administration (EIA) Indexed Site

    Office of Electricity, Coal, Nuclear, and Renewables Analysis December 8, 2015 | Washington, DC AEO2016 Electricity Working Group WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE What to look for: Electricity sector in AEO2016 * Inclusion of EPA final Clean Power Plan in Reference Case * Updated cost estimates for new generating technologies * Major data update on existing coal plant status: MATS- compliant technology or retirement

  4. Competition Advocates and Task-Order and Delivery Order Ombudsman |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Acquisition Management Competition Advocates and Task-Order and Delivery Order Ombudsman There are two senior agency positions dedicated to ensuring full and open competition as a part of the federal contracting process: Competition Advocates and Task-Order and Delivery Order Ombudsman. Competition Advocates are responsible for: Promoting full and open competition; Promoting the acquisition of commercial items; Removing barriers to full and

  5. Technical Basis for Work Place Air Monitoring for the Plutonium Finishing Plan (PFP)

    SciTech Connect (OSTI)

    JONES, R.A.

    1999-10-06

    This document establishes the basis for the Plutonium Finishing Plant's (PFP) work place air monitoring program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), Part 835 ''Occupational Radiation Protection''; Hanford Site Radiological Control Manual (HSRCM-1); HNF-PRO-33 1, Work Place Air Monitoring; WHC-SD-CP-SAR-021, Plutonium Finishing Plant Final Safety Analysis Report; and Applicable recognized national standards invoked by DOE Orders and Policies.

  6. Paperclips Etc. Special Order Form

    Broader source: Energy.gov (indexed) [DOE]

    PSS-02.2 (March 7, 2011) Replaces PSS-02.1 PAPERCLIPS Etc. SPECIAL Orders Form This form is used to order supplies that are not readily available in the DOE HQ self-service supply...

  7. Price Quotes and Isotope Ordering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ordering Price Quotes and Isotope Ordering Isotopes produced at Los Alamos National Laboratory are saving lives, advancing cutting-edge research and keeping the U.S. safe. Isotope...

  8. DOE - Fossil Energy: Orders-2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Order Granting Blanket Authority to Export Natural Gas to Mexico 3366 13-146-NG 121213 Iberdrola Energy Services, LLC Order Granting Blanket Authority to ImportExport Natural ...

  9. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Get Access to Work Onsite Print Monday, 31 August 2009 09:48 The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to

  10. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Print The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can take 4-6 months to

  11. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Print The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can take 4-6 months to

  12. OSCARS Collaborative Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OSCARS Collaborative Work Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers...

  13. Working Remotely | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Analysis & Projections Glossary › FAQS › Overview Projection Data Monthly short-term forecasts to 2016 Annual projections to 2040 International projections All projections reports Analysis & Projections Major Topics Most popular Annual Energy Outlook related Congressional & other requests International Energy Outlook related Presentations Recurring Short-Term Outlook Related Special outlooks Testimony All reports Browse by Tag Alphabetical Frequency Tag Cloud Working Paper Series

  14. ORDER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rack or container with the firing chamber empty. During normal operations, long guns (e.g., rifles, shotguns, submachine guns) must not be carried with a round in the...

  15. Comparison of Second-Order Loads on a Tension-Leg Platform for Wind Turbines: Preprint

    SciTech Connect (OSTI)

    Gueydon, S.; Wuillaume, P.; Jonkman, J.; Robertson, A.; Platt, A.

    2015-03-01

    The first objective of this work is to compare the two floating offshore wind turbine simulation packages {DIFFRAC+aNySIM} and {WAMIT+FAST}. The focus is on second-order wave loads, and so first- and second-order wave loads are applied to a structure sequentially for a detailed comparison and a more precise analysis of the effects of the second-order loads. aNySIM does not have the capability to model flexible bodies, and so the simulations performed in this tool are done assuming a rigid body. FAST also assumes that the platform is rigid, but can account for the flexibility of the tower. The second objective is to study the effects of the second-order loads on the response of a TLP floating wind turbine. The flexibility of the tower must be considered for this investigation, and therefore only FAST is used.

  16. Service and Repair Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    service and repair work Service and Repair Work Whenever on-site service or repair work needs to be done, a Procurement Work Sheet (PWS) must be completed, and possibly an IWS, authorized and released. PWS is required for service work even if there are no apparent hazards. PWS is required for work in Jupiter Laser Facility even if you have a PWS for service/repairs in another location. To complete a PWS for service work in Jupiter Laser Facility, please contact Sean Holte (2-3905, pager #05312).

  17. FY11 Work Package Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE MANAGED HLW AND SNF DISPOSAL PRELIMINARY ANALYSIS OF THE EFFECT OF DECAY HEAT IN THE NEAR FIELD Teklu Hadgu, Heeho Park and Ed Matteo Sandia National Laboratories UFD Working Group Meeting June 9, 2016 SAND2016-6239 C Used Fuel Disposition Thermal Analysis of DOE Managed HLW and SNF  Detailed thermal analysis for various disposal concepts  Disposal in crystalline and salt host rocks  Single-pack and multi-pack packaging  Thermal-only Semi-analytical methods and Thermal- Hydrology

  18. Effects of Second-Order Hydrodynamics on a Semisubmersible Floating Offshore Wind Turbine: Preprint

    SciTech Connect (OSTI)

    Bayati, I.; Jonkman, J.; Robertson, A.; Platt, A.

    2014-07-01

    The objective of this paper is to assess the second-order hydrodynamic effects on a semisubmersible floating offshore wind turbine. Second-order hydrodynamics induce loads and motions at the sum- and difference-frequencies of the incident waves. These effects have often been ignored in offshore wind analysis, under the assumption that they are significantly smaller than first-order effects. The sum- and difference-frequency loads can, however, excite eigenfrequencies of the system, leading to large oscillations that strain the mooring system or vibrations that cause fatigue damage to the structure. Observations of supposed second-order responses in wave-tank tests performed by the DeepCwind consortium at the MARIN offshore basin suggest that these effects might be more important than originally expected. These observations inspired interest in investigating how second-order excitation affects floating offshore wind turbines and whether second-order hydrodynamics should be included in offshore wind simulation tools like FAST in the future. In this work, the effects of second-order hydrodynamics on a floating semisubmersible offshore wind turbine are investigated. Because FAST is currently unable to account for second-order effects, a method to assess these effects was applied in which linearized properties of the floating wind system derived from FAST (including the 6x6 mass and stiffness matrices) are used by WAMIT to solve the first- and second-order hydrodynamics problems in the frequency domain. The method has been applied to the OC4-DeepCwind semisubmersible platform, supporting the NREL 5-MW baseline wind turbine. The loads and response of the system due to the second-order hydrodynamics are analysed and compared to first-order hydrodynamic loads and induced motions in the frequency domain. Further, the second-order loads and induced response data are compared to the loads and motions induced by aerodynamic loading as solved by FAST.

  19. Public Order and Safety Buildings

    U.S. Energy Information Administration (EIA) Indexed Site

    | Activity Subcategories | Energy Use Public Order and Safety Buildings... Volunteer fire stations tend not to be government owned, which probably explains why 33 percent of...

  20. UFD Working Group 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group 2015 - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us ... Twitter Google + Vimeo GovDelivery SlideShare UFD Working Group 2015 HomeStationary ...

  1. High-Order/Low-Order methods for ocean modeling

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Newman, Christopher; Womeldorff, Geoff; Chacón, Luis; Knoll, Dana A.

    2015-06-01

    We examine a High Order/Low Order (HOLO) approach for a z-level ocean model and show that the traditional semi-implicit and split-explicit methods, as well as a recent preconditioning strategy, can easily be cast in the framework of HOLO methods. The HOLO formulation admits an implicit-explicit method that is algorithmically scalable and second-order accurate, allowing timesteps much larger than the barotropic time scale. We demonstrate how HOLO approaches, in particular the implicit-explicit method, can provide a solid route for ocean simulation to heterogeneous computing and exascale environments.

  2. ESPC ENABLE Draft Task Order

    Broader source: Energy.gov [DOE]

    Document provides a draft for an agency to use when forming an ESPC ENABLE contract and making a task order award. This draft task order provides the framework for a contract that agencies and energy service companies can tailor to the particular needs of each site or project.

  3. Interagency Sustainability Working Group

    Broader source: Energy.gov [DOE]

    The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the federal government.

  4. AEO2014 Renewables Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    FOR: John Conti Assistant Administrator for Energy Analysis Alan Beamon Office Director, Office of Electricity, Coal, Nuclear, and Renewables Analysis FROM: Chris Namovicz, Renewable Electricity Analysis Team SUBJECT: AEO2014 Renewables Working Group Meeting This Renewables Working Group meeting on July 9, 2013 was the first of two, and focused on the assumptions and modeling efforts that EIA plans on using as the starting point for its AEO 2014 renewable electricity projections. The meeting was

  5. 3D Charge Order Found in Superconductor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3D Charge Order Found in Superconductor Print Despite 30 years of intense study, the explanation behind the zero-resistance current displayed by high-temperature superconductors (HTSCs) is still shrouded in complexity. HTSCs tend to be heterogeneous materials with multiple phases, and disentangling their various electronic behaviors for analysis can be difficult. At the ALS, researchers used resonant soft x-ray diffraction (RSXD), a technique sensitive to both structure and electronic state at

  6. 3D Charge Order Found in Superconductor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3D Charge Order Found in Superconductor Print Despite 30 years of intense study, the explanation behind the zero-resistance current displayed by high-temperature superconductors (HTSCs) is still shrouded in complexity. HTSCs tend to be heterogeneous materials with multiple phases, and disentangling their various electronic behaviors for analysis can be difficult. At the ALS, researchers used resonant soft x-ray diffraction (RSXD), a technique sensitive to both structure and electronic state at

  7. 3D Charge Order Found in Superconductor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3D Charge Order Found in Superconductor Print Despite 30 years of intense study, the explanation behind the zero-resistance current displayed by high-temperature superconductors (HTSCs) is still shrouded in complexity. HTSCs tend to be heterogeneous materials with multiple phases, and disentangling their various electronic behaviors for analysis can be difficult. At the ALS, researchers used resonant soft x-ray diffraction (RSXD), a technique sensitive to both structure and electronic state at

  8. 3D Charge Order Found in Superconductor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3D Charge Order Found in Superconductor Print Despite 30 years of intense study, the explanation behind the zero-resistance current displayed by high-temperature superconductors (HTSCs) is still shrouded in complexity. HTSCs tend to be heterogeneous materials with multiple phases, and disentangling their various electronic behaviors for analysis can be difficult. At the ALS, researchers used resonant soft x-ray diffraction (RSXD), a technique sensitive to both structure and electronic state at

  9. 3D Charge Order Found in Superconductor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3D Charge Order Found in Superconductor Print Despite 30 years of intense study, the explanation behind the zero-resistance current displayed by high-temperature superconductors (HTSCs) is still shrouded in complexity. HTSCs tend to be heterogeneous materials with multiple phases, and disentangling their various electronic behaviors for analysis can be difficult. At the ALS, researchers used resonant soft x-ray diffraction (RSXD), a technique sensitive to both structure and electronic state at

  10. 3D Charge Order Found in Superconductor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3D Charge Order Found in Superconductor Print Despite 30 years of intense study, the explanation behind the zero-resistance current displayed by high-temperature superconductors (HTSCs) is still shrouded in complexity. HTSCs tend to be heterogeneous materials with multiple phases, and disentangling their various electronic behaviors for analysis can be difficult. At the ALS, researchers used resonant soft x-ray diffraction (RSXD), a technique sensitive to both structure and electronic state at

  11. ORDER FOR SUPPLIES OR SERVICES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SH P VIA 8. TYPE OF ORDER b. COMPANY NAME c. STREET ADDRESS d. CITY e. STATE f. Z P CODE 9. ACCOUNTING AND APPROPRIATION DATA a. PURCHASE b. DELIVERY REFERENCE YOUR: Please furnish the following on the terms and conditions specified on both sides of this order and on the attached sheet, if any including delivery as indicated. Except for billing instructions on the reverse, this delivery order is subject to instructions contained on this side only of this form and is issued subject to the terms

  12. Seismic Isolation Working Meeting Gap Analysis Report

    SciTech Connect (OSTI)

    Justin Coleman; Piyush Sabharwall

    2014-09-01

    The ultimate goal in nuclear facility and nuclear power plant operations is operating safety during normal operations and maintaining core cooling capabilities during off-normal events including external hazards. Understanding the impact external hazards, such as flooding and earthquakes, have on nuclear facilities and NPPs is critical to deciding how to manage these hazards to expectable levels of risk. From a seismic risk perspective the goal is to manage seismic risk. Seismic risk is determined by convolving the seismic hazard with seismic fragilities (capacity of systems, structures, and components (SSCs)). There are large uncertainties associated with evolving nature of the seismic hazard curves. Additionally there are requirements within DOE and potential requirements within NRC to reconsider updated seismic hazard curves every 10 years. Therefore opportunity exists for engineered solutions to manage this seismic uncertainty. One engineered solution is seismic isolation. Current seismic isolation (SI) designs (used in commercial industry) reduce horizontal earthquake loads and protect critical infrastructure from the potentially destructive effects of large earthquakes. The benefit of SI application in the nuclear industry is being recognized and SI systems have been proposed, in the American Society of Civil Engineers (ASCE) 4 standard, to be released in 2014, for Light Water Reactors (LWR) facilities using commercially available technology. However, there is a lack of industry application to the nuclear industry and uncertainty with implementing the procedures outlined in ASCE-4. Opportunity exists to determine barriers associated with implementation of current ASCE-4 standard language.

  13. TMP: Order (2013-CE-5334)

    Broader source: Energy.gov [DOE]

    DOE ordered TMP Manufacturing Company, Inc. to pay a $8,000 civil penalty after finding TMP had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  14. Sylvane: Order (2013-CE-36005)

    Broader source: Energy.gov [DOE]

    DOE ordered Sylvane, Inc. to pay a $4,000 civil penalty after finding Sylvane had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  15. Morris: Order (2013-SE-5403)

    Broader source: Energy.gov [DOE]

    DOE ordered Morris Products, Inc. to pay a $170,720 civil penalty after finding Morris had manufactured and distributed in commerce in the U.S. a large quantity of noncompliant metal halide lamp fixtures.

  16. Trastar: Order (2013-CE-49003)

    Broader source: Energy.gov [DOE]

    DOE ordered Trastar Inc. to pay a $8,000 civil penalty after finding Trastar had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  17. Emerson: Order (2014-CE-54001)

    Broader source: Energy.gov [DOE]

    DOE ordered Emerson Electric Co. to pay a $8,000 civil penalty after finding Emerson had failed to certify that certain models of metal halide lamp fixtures comply with the applicable energy conservation standards.

  18. Sunpentown: Order (2012-CE-1505)

    Broader source: Energy.gov [DOE]

    DOE ordered Sunpentown International Inc. to pay a $12,160 civil penalty after finding Sunpentown had failed to certify that certain models of room air conditioners comply with the applicable energy conservation standards.

  19. Daewoo: Order (2010-CE-0410)

    Broader source: Energy.gov [DOE]

    DOE ordered Daewoo International, Inc. to pay a $5,000 civil penalty after finding Daewoo had failed to certify that certain models of residential clothes dryers comply with the applicable energy conservation standards.

  20. Simkar: Order (2012-SE-5408)

    Broader source: Energy.gov [DOE]

    DOE ordered Simkar Corporation to pay a $28,193 civil penalty after finding Simkar had manufactured and distributed in commerce in the U.S. 326 units of a variety of noncompliant metal halide lamp fixtures basic models.

  1. Sears: Order (2012-CE-3606)

    Broader source: Energy.gov [DOE]

    DOE ordered Sears, Roebuck & Co. to pay an $8,000 civil penalty after finding Sears had failed to certify that Sears dehumidifiers comply with the applicable energy conservation standard.

  2. Quorum: Order (2014-CE-32013)

    Broader source: Energy.gov [DOE]

    DOE ordered Davoil, Inc. d/b/a Quorum International, Inc. to pay a $8,000 civil penalty after finding Quorum had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  3. Electrolux: Order (2014-CE-23015)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America, Inc. to pay a $16,000 civil penalty after finding Electrolux had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  4. Electrolux: Order (2012-CE-1901)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America to pay a $6,500 civil penalty after finding Electrolux had failed to certify that certain dishwashers comply with the applicable energy conservation standard.

  5. Aircooler: Order (2013-CE-5338)

    Broader source: Energy.gov [DOE]

    DOE ordered Aircooler Corporation to pay a $8,000 civil penalty after finding Aircooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  6. Litex: Order (2014-CE-32011)

    Broader source: Energy.gov [DOE]

    DOE ordered Litex Industries, Limited to pay a $8,000 civil penalty after finding Litex had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  7. Hydac: Order (2012-SE-4107)

    Broader source: Energy.gov [DOE]

    DOE ordered Hydac Technology Corporation to pay a $29,000 civil penalty after finding Hydac had manufactured and distributed in commerce in the U.S. noncompliant electric motors.

  8. TCP: Order (2011-CE-3501)

    Broader source: Energy.gov [DOE]

    DOE ordered Technical Consumer Products, Inc. to pay a $3,000 civil penalty after finding TCP had failed to certify that a certain model of medium base compact fluorescent lamp (CFL) complies with the applicable energy conservation standards.

  9. LG: Order (2015-CE-14022)

    Broader source: Energy.gov [DOE]

    DOE ordered LG Electronics USA, Inc. to pay a $8,000 civil penalty after finding LG had failed to certify that various refrigerator-freezer basic models comply with the applicable energy conservation standards.

  10. Maxlite: Order (2015-CE-27018)

    Broader source: Energy.gov [DOE]

    DOE ordered Maxlite, Inc. to pay a $8,000 civil penalty after finding Maxlite had failed to certify that certain models of general service fluorescent lamps comply with the applicable energy conservation standards.

  11. Electrolux: Order (2015-CE-14020)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America, Inc. to pay a $20,000 civil penalty after finding Electrolux had failed to certify that certain models of refrigerator-freezers comply with the applicable energy conservation standards.

  12. Eurodib: Order (2014-CE-45001)

    Broader source: Energy.gov [DOE]

    DOE ordered Eurodib Inc. to pay a $8,000 civil penalty after finding Eurodib had failed to certify that certain models of automatic commercial ice makers comply with the applicable energy conservation standards.

  13. Barron: Order (2013-CE-48004)

    Broader source: Energy.gov [DOE]

    DOE ordered Barron Lighting Group, Inc. to pay a $8,000 civil penalty after finding Barron had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards.

  14. Keystone: Order (2013-CE-2601)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Keystone Technologies, LLC to pay a $8,000 civil penalty after finding Keystone had failed to certify that certain models of fluorescent lamp ballasts comply with the applicable energy conservation standards.

  15. Smeg: Order (2014-CE-23003)

    Broader source: Energy.gov [DOE]

    DOE ordered Smeg USA, Inc. to pay a $16,000 civil penalty after finding Smeg had failed to certify that certain models of refrigerators/refrigerator-freezers/freezers, dishwashers, and cooking products comply with the applicable energy conservation standards.

  16. Leer: Order (2013-CE-5325)

    Broader source: Energy.gov [DOE]

    DOE ordered Leer, Inc. to pay a $8,000 civil penalty after finding Leer had failed to certify that certain models of walk-in cooler and freezer (WICF) components comply with the applicable energy conservation standards.

  17. Dacor: Order (2014-CE-23010)

    Broader source: Energy.gov [DOE]

    DOE ordered Dacor to pay a $8,000 civil penalty after finding Dacor had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  18. Whirlpool: Order (2014-CE-21010)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Whirlpool Corporation to pay a $8,000 civil penalty after finding Whirlpool had failed to certify that certain models of residential clothes dryers comply with the applicable energy conservation standards.

  19. DHI: Order (2014-CE-32004)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered DHI Corp. to pay a $8,000 civil penalty after finding DHI had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  20. Vaxcel: Order (2014-CE-32006)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Vaxcel International Co., Ltd. to pay a $8,000 civil penalty after finding Vaxcel had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  1. ETL: Order (2015-CW-29003)

    Broader source: Energy.gov [DOE]

    DOE ordered ETL, LLC to pay a $8,000 civil penalty after finding ETL had failed to certify that certain models of showerheads comply with the applicable water conservation standards.

  2. Winix: Order (2012-CE-3607)

    Broader source: Energy.gov [DOE]

    DOE ordered Cloud 9 Marketing, Inc. d/b/a Winix, Inc., to pay a $8,000 civil penalty after finding Winix had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  3. BSH: Order (2013-CE-2001)

    Broader source: Energy.gov [DOE]

    DOE ordered BSH Home Appliances Corp. to pay a $8,000 civil penalty after finding BSH had failed to certify that certain models of residential clothes washers comply with the applicable energy/water conservation standards.

  4. Almo: Order (2012-CE-1416)

    Broader source: Energy.gov [DOE]

    DOE ordered Almo Corporation to pay a $6,500 civil penalty after finding Almo had failed to certify that certain models of residential refrigerators comply with the applicable energy conservation standards.

  5. Averen: Order (2010-CW-0711)

    Broader source: Energy.gov [DOE]

    DOE ordered Averen, Inc. to pay a $5,000 civil penalty after finding Averen had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  6. Danco: Order (2015-CW-28006)

    Broader source: Energy.gov [DOE]

    DOE ordered Danco, Inc. to pay a $8,000 civil penalty after finding Danco had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  7. Kohler: Order (2014-CW-30003)

    Broader source: Energy.gov [DOE]

    DOE ordered Kohler Co. to pay a $8,000 civil penalty after finding Kohler had failed to certify that certain models of water closets comply with the applicable water conservation standards.

  8. Perlick: Order (2013-SE-14001)

    Broader source: Energy.gov [DOE]

    DOE ordered Perlick Corporation to pay a $168,200 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. 841 units of basic model HP24F, a noncompliant freezer.

  9. Northland: Order (2014-CE-23002)

    Broader source: Energy.gov [DOE]

    DOE ordered Northland Corporation d/b/a AGA Marvel to pay a $16,000 civil penalty after finding Northland had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  10. Curtis: Order (2015-CE-14021)

    Broader source: Energy.gov [DOE]

    DOE ordered Curtis International, Ltd. to pay a $5,800 civil penalty after finding Curtis had failed to certify that refrigerator-freezer basic model FR9211 complies with the applicable energy conservation standards.

  11. Nicor: Order (2014-CE-32016)

    Broader source: Energy.gov [DOE]

    DOE ordered Nicor, Inc. to pay a $8,000 civil penalty after finding Nicor had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  12. Acuity: Order (2013-CE-4802)

    Broader source: Energy.gov [DOE]

    DOE ordered Acuity Brands Lighting to pay a $8,000 civil penalty after finding Acuity had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards.

  13. Satco: Order (2013-CE-2702)

    Broader source: Energy.gov [DOE]

    DOE ordered Satco Products, Inc. to pay a $8,000 civil penalty after finding Satco had failed to certify that certain models of general service fluorescent lamps comply with the applicable energy conservation standards.

  14. Avanti: Order (2013-CE-2105)

    Broader source: Energy.gov [DOE]

    DOE ordered Avanti Products, LLC to pay a $8,000 civil penalty after finding Avanti had failed to certify that certain models of residential clothes dryers comply with the applicable energy conservation standards.

  15. Dialight: Order (2013-CE-4902)

    Broader source: Energy.gov [DOE]

    DOE ordered Dialight Corporation to pay a $8,000 civil penalty after finding Dialight had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  16. Perlick: Order (2011-SE-1401)

    Broader source: Energy.gov [DOE]

    DOE ordered Perlick Corporation to pay a $400 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. at least two noncompliant model HP48RO, electric refrigerators.

  17. Perlick: Order (2013-SE-14002)

    Broader source: Energy.gov [DOE]

    DOE ordered Perlick Corporation to pay a $60,725 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. 347 units of basic model HP48RR, a noncompliant refrigerator.

  18. Haier: Order (2011-CE-2104)

    Broader source: Energy.gov [DOE]

    DOE ordered Haier to pay an $20,000 civil penalty after finding Haier had failed to certify that Haier residential clothes dryers comply with the applicable energy conservation standard.

  19. Amerisink: Order (2010-CW-0710)

    Broader source: Energy.gov [DOE]

    DOE ordered Amerisink, Inc. to pay a $5,000 civil penalty after finding Amerisink had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  20. Leotek: Order (2013-CE-4903)

    Broader source: Energy.gov [DOE]

    DOE ordered Leotek Electronics USA Corp. to pay a $8,000 civil penalty after finding Leotek had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  1. Amerikooler: Order (2013-CE-5307)

    Broader source: Energy.gov [DOE]

    DOE ordered Amerikooler, Inc. to pay a $8,000 civil penalty after finding Amerikooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  2. Legacy: Order (2015-CE-14025)

    Broader source: Energy.gov [DOE]

    DOE ordered The Legacy Companies to pay a $8,000 civil penalty after finding Legacy had failed to certify that refrigerator Maxx-Ice brand basic model MCR3U complies with the applicable energy conservation standards.

  3. Renewable Electricity Working Group Presentation

    U.S. Energy Information Administration (EIA) Indexed Site

    Renewable Electricity Working Group Chris Namovicz, Renewable Electricity Analysis Team July 9, 2013 Agenda * Review status of AEO 2013 * Discuss new model updates and development efforts for AEO 2014 and future AEOs - Model updates - Policy updates - Planned additions updates - Performance updates * Obtain feedback from stakeholders on any key items that EIA should look at Chris Namovicz, July 9 2 Status of AEO 2013 Chris Namovicz, July 9 * AEO 2013 was released in stages this year - Reference

  4. ORISE: Working with ORISE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oak Ridge Institute for Science Education Working with ORISE If you are interested in learning about how your agency can utilize the capabilities of the Oak Ridge Institute for Science and Education (ORISE) through a Work for Others agreement or a procurement contract, or if you are looking for career opportunities, the following information provides an explanation of how to work with ORISE. If you do not see an option that applies to your needs, please contact ORISE General Information.

  5. Work/Life Balance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab » Work/Life Balance Work/Life Balance Explore the multiple dimensions of a career at Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Complete suite of benefits to balance your career Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge

  6. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They ...

  7. Executive Orders Defining Tribal Relationships | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Orders Defining Tribal Relationships Executive Orders Defining Tribal Relationships Executive Order 13592 Improving American Indian and Alaska Native Educational Opportunities and Strengthening Tribal Colleges and Universities (2011). Superseded EO 13021 to ensure that all American Indian students, regardless of which institution they attend, receive support from the federal government at elementary through college levels. This EO also creates an Interagency Working Group on AI/AN

  8. Portsmouth Integration Director's Final Findings and Order | Department of

    Energy Savers [EERE]

    Energy Integration Director's Final Findings and Order Portsmouth Integration Director's Final Findings and Order Portsmouth Integration Director's Final Findings and Order purpose is to: integrate the on-site work required for specific units to avoid duplication of effort, and efficiently perform sitewide ground water monitoring and surveillance and maintenance activities; recognize that a substantial portion of the tasks required under existing approved closure plans for certain units have

  9. Quality Work Plan Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * No national standards for work quality * No portable and nationally recognized credentials for experienced WAP workers 3 NaConal Issues and Interests Supported the QWP * White ...

  10. INL @ work: Archaeologist

    ScienceCinema (OSTI)

    Lowrey, Dino

    2013-05-28

    INL @ work features jobs performed at the lab. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

  11. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal process or may be completed as an independent document. In the ESS, identify each material (including all biological materials) with which you will be working. The regulatory oversight for biological work is very complicated and we need to understand the risk levels involved with the material you plan to use at the ALS,

  12. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal process or may be completed as an independent document. In the ESS, identify each material (including all biological materials) with which you will be working. The regulatory oversight for biological work is very complicated and we need to understand the risk levels involved with the material you plan to use at the ALS,

  13. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal process or may be completed as an independent document. In the ESS, identify each material (including all biological materials) with which you will be working. The regulatory oversight for biological work is very complicated and we need to understand the risk levels involved with the material you plan to use at the ALS,

  14. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cells, viruses), plant or soil samples (USDA quarantines), recombinant DNA, or blood-borne pathogen. Biological Use Authorization The great majority of biological work at...

  15. INL @ work: Archaeologist

    SciTech Connect (OSTI)

    Lowrey, Dino

    2008-01-01

    INL @ work features jobs performed at the lab. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

  16. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for proper development and review time. Training All resident LBNL users (those whose work authorization includes a JHA) must take the standard LBNL training courses for...

  17. SCM Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modeling Working Group Translator Update Shaocheng Xie Lawrence Livermore National Laboratory Outline 1. Data development in support of CMWG * Climate modeling best estimate data * ...

  18. A stable 1D multigroup high-order low-order method

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Yee, Ben Chung; Wollaber, Allan Benton; Haut, Terry Scot; Park, HyeongKae

    2016-07-13

    The high-order low-order (HOLO) method is a recently developed moment-based acceleration scheme for solving time-dependent thermal radiative transfer problems, and has been shown to exhibit orders of magnitude speedups over traditional time-stepping schemes. However, a linear stability analysis by Haut et al. (2015 Haut, T. S., Lowrie, R. B., Park, H., Rauenzahn, R. M., Wollaber, A. B. (2015). A linear stability analysis of the multigroup High-Order Low-Order (HOLO) method. In Proceedings of the Joint International Conference on Mathematics and Computation (M&C), Supercomputing in Nuclear Applications (SNA) and the Monte Carlo (MC) Method; Nashville, TN, April 19–23, 2015. American Nuclear Society.)more » revealed that the current formulation of the multigroup HOLO method was unstable in certain parameter regions. Since then, we have replaced the intensity-weighted opacity in the first angular moment equation of the low-order (LO) system with the Rosseland opacity. Furthermore, this results in a modified HOLO method (HOLO-R) that is significantly more stable.« less

  19. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

  20. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-04-20

    It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

  1. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

  2. Reimbursable Work for the Department of Homeland Security

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-08-17

    The Order establishes DOE policies and procedures for the acceptance, performance, and administration of reimbursable work directly funded by the Department of Homeland Security.

  3. RESPONDING TO SOLICITATIONS UNDER DOE WORK FOR OTHERS PROGRAM

    Office of Environmental Management (EM)

    ... Department of Energy Acquisition Regulation (DEAR) 970.1707 and 970.5217-1, "Work for Others," The ... with the domestic private sector. 3 DOE Order 481.1C, WORK FOR OTHERS ...

  4. Waste Management Committee Fiscal Year 2012 Work Plan | Department...

    Office of Environmental Management (EM)

    Management Committee Fiscal Year 2012 Work Plan Waste Management Committee Fiscal Year 2012 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles Consent Order PDF icon WM-FY12-WP...

  5. Environmental Monitoring and Remediation Committee Fiscal Year 2013 Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy 3 Work Plan Environmental Monitoring and Remediation Committee Fiscal Year 2013 Work Plan Topics: Groundwater Surface water Storm water Consent Order EMR-FY13-WP - September 26, 2012 (12.78

  6. Environmental Monitoring and Remediation Committee Fiscal Year 2014 Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy 4 Work Plan Environmental Monitoring and Remediation Committee Fiscal Year 2014 Work Plan Topics: Groundwater Surface water Air Quality Consent Order EMR-FY14-WP - September 25, 2013 (14.51

  7. Waste Management Committee Fiscal Year 2014 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Work Plan Waste Management Committee Fiscal Year 2014 Work Plan Topics: TA-54 Consent Order TA-49 Remediation TA-21 Remediation Material Disposal Areas WM-FY14-WP - September 25, ...

  8. Waste Management Committee Fiscal Year 2015 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 Work Plan Waste Management Committee Fiscal Year 2015 Work Plan Topics: TA-54 Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY15-WP - November 17, 2014 (255.83

  9. Adaptive h -refinement for reduced-order models: ADAPTIVE h -refinement for reduced-order models

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Carlberg, Kevin T.

    2014-11-05

    Our work presents a method to adaptively refine reduced-order models a posteriori without requiring additional full-order-model solves. The technique is analogous to mesh-adaptive h-refinement: it enriches the reduced-basis space online by ‘splitting’ a given basis vector into several vectors with disjoint support. The splitting scheme is defined by a tree structure constructed offline via recursive k-means clustering of the state variables using snapshot data. This method identifies the vectors to split online using a dual-weighted-residual approach that aims to reduce error in an output quantity of interest. The resulting method generates a hierarchy of subspaces online without requiring large-scale operationsmore » or full-order-model solves. Furthermore, it enables the reduced-order model to satisfy any prescribed error tolerance regardless of its original fidelity, as a completely refined reduced-order model is mathematically equivalent to the original full-order model. Experiments on a parameterized inviscid Burgers equation highlight the ability of the method to capture phenomena (e.g., moving shocks) not contained in the span of the original reduced basis.« less

  10. Hicon: Order (2013-SE-1426)

    Broader source: Energy.gov [DOE]

    DOE ordered Ningbo Hicon International Industry Company, Ltd. to pay a $1,912,714 civil penalty after finding Hicon had manufactured and distributed in commerce in the U.S. 115,126 units of basic model BD-200, a noncompliant freezer.

  11. Teddico: Order (2012-SE-5409)

    Broader source: Energy.gov [DOE]

    DOE ordered The Electrical Design, Development and Implementation Company d/b/a Teddico to pay a $18,994 civil penalty after finding Teddico had manufactured and distributed in commerce in the U.S. 218 units of a variety of noncompliant metal halide lamp fixtures basic models.

  12. Topaz: Order (2014-CE-35005)

    Broader source: Energy.gov [DOE]

    DOE ordered Topaz Lighting Corp. to pay a $8,000 civil penalty after finding Topaz had failed to certify that certain basic models of medium base compact fluorescent lamps, general service fluorescent lamps, and illuminated exit signs comply with the applicable energy conservation standards.

  13. PQL: Order (2013-CE-27001)

    Broader source: Energy.gov [DOE]

    DOE ordered P.Q.L., Inc. to pay a $8,000 civil penalty after finding PQL had failed to certify that various basic models of medium base compact fluorescent lamps, general service fluorescent lamps, fluorescent lamp ballasts, and illuminated exit signs comply with the applicable energy conservation standards.

  14. Philips: Order (2012-SE-2605)

    Broader source: Energy.gov [DOE]

    DOE ordered Philips Lighting Electronics N. A. to pay a $82,478 civil penalty after finding Philips had manufactured and distributed in commerce in the U.S. 7,498 units of basic model VEL-1S40-SC, noncompliant fluorescent lamp ballasts.

  15. ELCO: Order (2014-SE-54005)

    Broader source: Energy.gov [DOE]

    DOE ordered ELCO Lighting to pay a $14,000 civil penalty after finding ELCO had failed to certify that certain models of illuminated exit signs and metal halide lamp fixtures comply with the applicable energy conservation standards and had failed to provide requested test data.

  16. Midea: Order (2013-SE-1505)

    Broader source: Energy.gov [DOE]

    DOE ordered GD Midea Air-Conditioning Equipment Co. Ltd. to pay a $416,800 civil penalty after finding Midea had manufactured and distributed in commerce in the U.S. atleast 14,968 units of basic model MWJ1-08ERN1-BI8, a noncompliant room air conditioner.

  17. Philips: Order (2014-SE-48006)

    Broader source: Energy.gov [DOE]

    DOE ordered Philips Lighting North America Corp. to pay a $75,000 civil penalty after finding Philips had manufactured and distributed in commerce in the U.S. at least 12,275 units of a variety of illuminated exit sign models.

  18. Order 430.1D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 In response to requirements of Executive Order 13287, Preserve America Office of History and Heritage Resources Office of the Executive Secretariat U.S. Department of Energy September 2014 An Assessment of Historic Properties and Preservation Activities at the U.S. Department of Energy Table of Contents Introduction ............................................................................................................................................ 3 Part I. Background and Overview

  19. Order 580.1D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    580.1D Title: PERSONAL PROPERTY MANAGEMENT Owner: Thomas Wilson, Jr., Office of Institutional Operations Approving Official: Bradley J. Tomer, Chief Operating Officer, Office of the Director {signature} /s/ Bradley J. Tomer Approval Date: 8/3/12 Last Reviewed Date: 8/3/12 Cancellation: Order 580.1C, Personal Property Management TABLE OF CONTENTS 1. PURPOSE ..................................................................................................................................... 2 2.

  20. Versonel: Order (2014-CE-21009)

    Broader source: Energy.gov [DOE]

    DOE ordered Smart Surplus, Inc. d/b/a Versonel to pay a $8,000 civil penalty after finding Versonel had failed to certify that certain models of refrigerators and residential clothes dryers comply with the applicable energy conservation standards.

  1. Whirlpool: Order (2013-SE-1420)

    Broader source: Energy.gov [DOE]

    DOE ordered Whirlpool Corporation to pay a $5,329,800 civil penalty after finding Whirlpool had manufactured and distributed in commerce in the U.S. at least 26,649 units of basic model 8TAR81 noncompliant refrigerator-freezer.

  2. LG: Order (2014-SE-15011)

    Broader source: Energy.gov [DOE]

    DOE ordered LG Electronics USA, Inc. to pay a $1,479,860 civil penalty after finding LG had manufactured and distributed in commerce in the U.S. at least 7,438 units of basic model LT143CNR, a noncompliant room air conditioner.

  3. Watermark: Order (2011-SW-2908)

    Broader source: Energy.gov [DOE]

    DOE ordered Watermark Designs, Ltd. to pay a $4,200 civil penalty after finding Watermark Designs, Ltd. had manufactured and distributed in commerce in the U.S. sixty-three units of basic model SH-FAL90, a noncompliant showerhead.

  4. Kichler: Order (2014-CE-32007)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered The L.D. Kichler Co. d/b/a Kichler Lighting to pay a $8,000 civil penalty after finding Kichler had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  5. Yosemite: Order (2014-CE-32015)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Northern Central Distributing, Inc. d/b/a Yosemite Home Dcor to pay a $8,000 civil penalty after finding Yosemite had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  6. Traulsen: Order (2015-SE-42002)

    Broader source: Energy.gov [DOE]

    DOE ordered Traulsen – ITW Food Group LLC to pay a $52,600 civil penalty after finding Traulsen had manufactured and distributed in commerce in the U.S. at least 284 units of commercial refrigerator-freezer basic model RDT132DUT-HHS, a noncompliant product.

  7. Bigwall: Order (2014-SE-15006)

    Broader source: Energy.gov [DOE]

    DOE ordered Bigwall Enterprises, Inc. to abide by the terms of the Notice of Noncompliance Determination, issued on February 11, 2014, after finding Bigwall Enterprises, Inc. had privately labeled and distributed in commerce in the U.S. at least 600 units of PerfectAire brand room air conditioner model PACH8000.

  8. Midea: Order (2014-SW-20001)

    Broader source: Energy.gov [DOE]

    DOE ordered Hefei Rongshida Washing Equipment Manufacturing Co., Ltd. ("Hefei Rongshida"), a subsidiary of Midea Group, to pay a $64,780 civil penalty after finding Hefei Rongshida had manufactured and distributed in commerce in the U.S. 324 units of MAE80-S1702GPS, a noncompliant residential clothes washer.

  9. Universal: Order (2013-SE-26004)

    Broader source: Energy.gov [DOE]

    DOE ordered Universal Lighting Technologies, Inc. to pay a $7,264 civil penalty after finding Universal had manufactured and distributed in commerce in the U.S. 454 units of model B140R277HP, a noncompliant fluorescent lamp ballast.

  10. Trails Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Trails Working Group Our mission is to inventory, map, and prepare historical reports on the many trails used at LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The LANL Trails Working Group inventories, maps, and prepares historical reports on the many trails used at LANL. Some of these trails are ancient pueblo footpaths that continue to be used for recreational hiking today. Some serve as quiet

  11. A practical exercise in assessing order compliance

    SciTech Connect (OSTI)

    Hallinan, E.J.

    1993-01-01

    Two orders impacting DOE nuclear safety analyses were issued in 1992: DOE 5480.22, Technical Safety Requirements,'' and DOE 5480.23, Nuclear Safety Analysis Reports.'' Both orders required submitting plans and schedules for compliance with the new requirements by 6 months from the issuance dates. These assessments resulted in a major effort by the Westinghouse Savannah River Co. (WSRC) for some 30 current and future safety analyses that span three Program Secretarial Offices. Further, the local field office expressed a vital interest in determining the shape of compliance for site nuclear operations. Thus, a team of about 20 people were involved in: Interpreting and obtaining concurrence with implementation issues; identifying applicable nuclear facilities; baselining the status of compliance with previous requirements; comparing new to previous requirements; scheduling future activities to achieve compliance with the new requirements; estimating baseline and additional costs; and obtaining management approvals.

  12. Clean Energy Works

    Broader source: Energy.gov [DOE]

    Through Clean Energy Works, homeowners can finance up to $30,000 at a fixed interest rate for home energy efficiency retrofits for a variety of measures. Customers have varying lender and loan op...

  13. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for ... . . . . . . . . 1-1 1.3 Sources of Ground-Water Contamination from Milling Operations . . ...

  14. Exhibit G / working draft

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... DEAR 952.204-73 Facility Clearance (May 2002) Applies when Subcontractor employeesworkers ... work requires workers to hold a clearance and have a need to know to perform in ...

  15. Fermilab: Science at Work

    ScienceCinema (OSTI)

    Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

    2013-02-14

    Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

  16. Working Group Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Working Group Reports Special Working Session on the Role of Buoy Observations in the Tropical Western Pacific Measurement Scheme J. Downing Marine Sciences Laboratory Sequim, Washington R. M. Reynolds Brookhaven National Laboratory Upton, New York Attending W. Clements (TWPPO) F. Barnes (TWPPO) T. Ackerman (TWP Site Scientist) M. Ivey (ARCS Manager) H. Church J. Curry J. del Corral B. DeRoos S. Kinne J. Mather J. Michalsky M. Miller P. Minnett B. Porch J. Sheaffer P. Webster M. Wesely K.

  17. Fermilab: Science at Work

    SciTech Connect (OSTI)

    Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

    2013-02-01

    Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

  18. Working With Us | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working With Us Join us in building a clean energy future. NREL offers many opportunities to industry, organizations, government, researchers, businesses, students, educators, and vendors. At NREL, we work with organizations large and small through research partnerships, licensing of NREL technologies, support for cleantech stakeholders, and fostering the clean energy economy. Join us to accelerate the movement of renewable energy and energy-efficient solutions into practical applications.

  19. YMGI: Order (2011-SCE-1605)

    Broader source: Energy.gov [DOE]

    DOE ordered YMGI Group LLC to pay a $31,400 civil penalty after finding (1) YMGI had failed to certify that certain models of residential central air conditioners comply with the applicable energy conservation standards and (2) YMGI had distributed in commerce model TTWC-18K-31B, a through-the-wall air conditioner that does not meet the applicable energy conservation standard.

  20. Cooper: Order (2012-SE-4701)

    Broader source: Energy.gov [DOE]

    DOE ordered Cooper Power Systems, LLC to abide by the Compromise Agreement, which waived the civil penalty after finding Cooper had inadvertently distributed in commerce in the U.S. three models (total of five units) of distribution transformers. Cooper agrees to abide by the terms of a Notice of Noncompliance Determination to be issued pursuant to 10 C.F.R. § 429.114.

  1. UT-Battelle Consent Order NCO-2015-02

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14, 2015 Dr. Thomas Mason Laboratory Director UT-Battelle, ... In accordance with 10 C.F.R. 820.23, Consent Order, the ... and causal analysis, (e) timely corrective actions ...

  2. International Refrigeration: Order (2012-CE-1510) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Refrigeration: Order (2012-CE-1510) International Refrigeration: Order (2012-CE-1510) July 20, 2012 DOE ordered International Refrigeration Products to pay an 8,000 ...

  3. Work Force Retention Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Force Retention Work Group Charter Work Force Retention Work Group Charter The Work force Retention Work Group is established to support the Department's critical focus on maintaining a high-performing work force at a time when a significant number of the workers needed to support DOE's national security mission are reaching retirement age. Work Force Retention Work Group Charter (86.92 KB) More Documents & Publications Workforce Retention Work Group Status Overview - September 2012 Training

  4. Work Force Restructuring Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to

  5. Exhibit G / working draft

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Off-site (Rev 6, 5/1/2015) P.R. No. * Date * Page 1 of 2 Subcontract No. or PO No. * EXHIBIT G OFF-SITE SECURITY REQUIREMENTS G1.0 Definitions and Acronyms (Feb 2014) Definitions and acronyms may be accessed electronically at http://www.lanl.gov/resources/_assets/docs/Exhibit-G/exhibit-g-definitions-acronyms-green.pdf G2.0 Statements Applicable To Scope of Work (May 2015) CONTRACTOR believes that all of the statements listed below are factually correct and applicable to the scope of work (SOW)

  6. How ICF Works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    icf / how icf works How ICF Works Shiva Laser When the 20-beam Shiva laser was completed in 1978, it was the world's most powerful laser. It delivered more than ten kilojoules of energy in less than a billionth of a second in its first full-power firing. About the size of a football field, Shiva was the latest in a series of laser systems built over two decades, each five to ten times more powerful than its predecessor. Since the late 1940s, researchers have used magnetic fields to confine hot,

  7. How Lasers Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    how_lasers_work How Lasers Work "Laser" is an acronym for light amplification by stimulated emission of radiation. A laser is created when the electrons in atoms in special glasses, crystals, or gases absorb energy from an electrical current or another laser and become "excited." The excited electrons move from a lower-energy orbit to a higher-energy orbit around the atom's nucleus. When they return to their normal or "ground" state, the electrons emit photons

  8. How NIF Works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How Much Do You Spend on Energy? How Much Do You Spend on Energy? U.S.A. Energy Expenditure per person Click on a state Energy Expenditure $3724 per person in 2012 Transportation ▀▀▀▀▀ Residential ▀▀▀▀▀ Data: EIA State Energy Data System View All Maps Addthis

    works How NIF Works A weak laser pulse-about 1 billionth of a joule-is created, split, and carried on optical fibers to 48 preamplifiers that increase the pulse's energy by a factor of 10 billion, to a few joules. The

  9. U.S. Department of Energy INTER-ENTLTY WORK ORDER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... former tank farm workers * Tank Farm vapors program in regards to 10 CFR 851 4.0 Deliverables: The contractor (SRNL) shall submit a project plan within two weeks of the start date. ...

  10. Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    concerning this policy flash should be directed to Mike Dombrowski, of the Office of Acquisition and Project Management Policy at 202-287-1828 or at michael.dombrowski@hq.doe....

  11. Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System Administrative Change

    Office of Energy Efficiency and Renewable Energy (EERE)

    Questions concerning this policy flash should be directed to Mike Dombrowski, of the Office of Acquisition and Project Management Policy at 202-287-1828 or at michael.dombrowski@hq.doe.gov.

  12. ORDER FOR SUPPLIES OR SERVICES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 DE-DT0004203 12EM002688 EMCBC U.S. Department of Energy EM Consolidated Business Center 250 E. 5th Street, Suite 500 DEBRA MARKELONIS VISIONARY SOLUTIONS, LLC 111 UNION VALLEY ROAD, SUITE B OAK RIDGE TN 378308036 See Schedule 12. F.O.B. POINT Destination 1 Days After Award EMCBC - Carlsbad US Department of Energy Carlsbad Project Office Carlsbad NM 88221 EMCBC - Carlsbad ITEM NO. (a) SUPPLIES OR SERVICES (b) QUANTITY ORDERED (c) UNIT (d) UNIT PRICE (e) AMOUNT (f) QUANTITY ACCEPTED (g) X X 2

  13. ORDER FOR SUPPLIES OR SERVICES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 DE-DT0005972 13EM002307 EMCBC U.S. Department of Energy EM Consolidated Business Center 250 E. 5th Street, Suite 500 DEBRA MARKELONIS VISIONARY SOLUTIONS, LLC 2553 QUALITY LANE KNOXVILLE TN 37931 See Schedule 12. F.O.B. POINT Destination 1 Days After Award EMCBC - Carlsbad US Department of Energy Carlsbad Project Office Carlsbad NM 88221 EMCBC - Carlsbad ITEM NO. (a) SUPPLIES OR SERVICES (b) QUANTITY ORDERED (c) UNIT (d) UNIT PRICE (e) AMOUNT (f) QUANTITY ACCEPTED (g) X 2 Destination

  14. ORDER FOR SUPPLIES OR SERVICES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2/12/2016 DE-DT0010705 16EM000994 EMCBC U.S. Department of Energy EM Consolidated Business Center 250 E. 5th Street, Suite 500 GILBERT TORRES SIGMA SCIENCE INC 500 MARQUETTE AVE. NW SUITE 1200 ALBUQUERQUE NM 87102 12. F.O.B. POINT Destination 0682/15/505460/01 ITEM NO. (a) SUPPLIES OR SERVICES (b) QUANTITY ORDERED (c) UNIT (d) UNIT PRICE (e) AMOUNT (f) QUANTITY ACCEPTED (g) X X 14 Destination Destination Cincinnati OH 45202 DE-EM0003878/ NET 30 f. SERVICE-DISABLED e. HUBZone g. WOMEN-OWNED SMALL

  15. Point model equations for neutron correlation counting: Extension of Böhnel's equations to any order

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Favalli, Andrea; Croft, Stephen; Santi, Peter

    2015-06-15

    Various methods of autocorrelation neutron analysis may be used to extract information about a measurement item containing spontaneously fissioning material. The two predominant approaches being the time correlation analysis (that make use of a coincidence gate) methods of multiplicity shift register logic and Feynman sampling. The common feature is that the correlated nature of the pulse train can be described by a vector of reduced factorial multiplet rates. We call these singlets, doublets, triplets etc. Within the point reactor model the multiplet rates may be related to the properties of the item, the parameters of the detector, and basic nuclearmore » data constants by a series of coupled algebraic equations – the so called point model equations. Solving, or inverting, the point model equations using experimental calibration model parameters is how assays of unknown items is performed. Currently only the first three multiplets are routinely used. In this work we develop the point model equations to higher order multiplets using the probability generating functions approach combined with the general derivative chain rule, the so called Faà di Bruno Formula. Explicit expression up to 5th order are provided, as well the general iterative formula to calculate any order. This study represents the first necessary step towards determining if higher order multiplets can add value to nondestructive measurement practice for nuclear materials control and accountancy.« less

  16. Point model equations for neutron correlation counting: Extension of Böhnel's equations to any order

    SciTech Connect (OSTI)

    Favalli, Andrea; Croft, Stephen; Santi, Peter

    2015-06-15

    Various methods of autocorrelation neutron analysis may be used to extract information about a measurement item containing spontaneously fissioning material. The two predominant approaches being the time correlation analysis (that make use of a coincidence gate) methods of multiplicity shift register logic and Feynman sampling. The common feature is that the correlated nature of the pulse train can be described by a vector of reduced factorial multiplet rates. We call these singlets, doublets, triplets etc. Within the point reactor model the multiplet rates may be related to the properties of the item, the parameters of the detector, and basic nuclear data constants by a series of coupled algebraic equations – the so called point model equations. Solving, or inverting, the point model equations using experimental calibration model parameters is how assays of unknown items is performed. Currently only the first three multiplets are routinely used. In this work we develop the point model equations to higher order multiplets using the probability generating functions approach combined with the general derivative chain rule, the so called Faà di Bruno Formula. Explicit expression up to 5th order are provided, as well the general iterative formula to calculate any order. This study represents the first necessary step towards determining if higher order multiplets can add value to nondestructive measurement practice for nuclear materials control and accountancy.

  17. Executive Order 13423: Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423: Strengthening Federal Environmental, Energy, and ...

  18. Nuclear World Order and Nonproliferation

    SciTech Connect (OSTI)

    Joeck, N

    2007-02-05

    The decision by India and Pakistan in May 1998 to conduct nuclear weapon tests and declare themselves as nuclear weapon states challenged South Asian regional stability calculations, US nonproliferation policy, and prevailing assumptions about international security. A decade later, the effects of those tests are still being felt and policies are still adjusting to the changed global conditions. This paper will consider non- and counter-proliferation policy options for the United States and Pakistan as they work as partners to prevent the transfer of nuclear technology and further nuclear proliferation.

  19. Price Quotes and Isotope Ordering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Price Elasticities for Energy Use in Buildings of the United States October 2014 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Price Elasticities for Energy Use in Buildings of the United States i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are

  20. LFRG DOE Order 435.1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LFRG DOE Order 435.1 LFRG DOE Order 435.1 Chapter 4 of the DOE Manual on Order 435.1, Low-level Waste Requirements, addresses the procedures whereby Department of Energy LLW Disposal Facilities will operated and maintained. Section P and Section Q describe the Performance Assessment and Composite Analysis documents that each DOE disposal facility will submit to the LFRG. To view the entire DOE Order, Manual, and Implementation Guidance documents, choose the link below to get to the main DOE

  1. Oak Ridge Reservation Compliance Order, September 26, 1995 Summary

    Office of Environmental Management (EM)

    Oak Ridge Reservation Compliance Order, September 26, 1995 State Tennessee Agreement Type Compliance Order Legal Driver(s) FFCAct Scope Summary Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan Parties DOE; Tennessee Department of Environment and Conservation Date 9/26/1995 SCOPE * Approve, with modifications made by TDEC, the "Proposed Site Treatment Plan for the Oak Ridge

  2. TRU TeamWorks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2004 By the Numbers WIPP marks five-year anniversary Shipments scheduled to arrive at WIPP for the week of 4/4/04 - 4/10/04: 18 Total shipments received at WIPP: 2,456 Total volume disposed at WIPP: 19,042 m 3 FY04 Performance Metrics D E P A R T M E N T O F E N E R G Y U N I T E D S T A T ES O F A M E R I C A TeamWorks TeamWorks TRU A weekly e-newsletter for the Waste Isolation Pilot Plant team For those who endured the early morning cold of March 26, 1999, to witness WIPP's first shipment,

  3. Rad-Hydro with a High-Order, Low-Order Method

    SciTech Connect (OSTI)

    Wollaber, Allan Benton; Park, HyeongKae; Lowrie, Robert Byron; Rauenzahn, Rick M.; Cleveland, Mathew Allen

    2015-08-04

    Moment-based acceleration via the development of high-order, low-order (HO-LO) algorithms has provided substantial accuracy and efficiency enhancements for solutions of the nonlinear, thermal radiative transfer equations by CCS-2 and T-3 staff members. Accuracy enhancements over traditional, linearized methods are obtained by solving a nonlinear, timeimplicit HO-LO system via a Jacobian-free Newton Krylov procedure. This also prevents the appearance of non-physical maximum principle violations (temperature spikes) associated with linearization. Efficiency enhancements are obtained in part by removing effective scattering from the linearized system. In this highlight, we summarize recent work in which we formally extended the HO-LO radiation algorithm to include operator-split radiation-hydrodynamics.

  4. Work plan (Nov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM STM Cloud Modeling Working Group Session AGENDA Brief introduction of new ARM funded modeling projects: ---------------------------------------------------------------------------------------------------------- 1:00 pm - 1:05 pm Understanding and Improving CRM and GCM Simulations of Cloud Systems with ARM Observations (Xiaoqing Wu, Iowa State University) 1:05 pm - 1:10 pm Interactions of Cumulus Convection and the Boundary Layer at the Southern Great Plains ACRF (Steve Krueger, University of

  5. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  6. Emergency Preparedness Working

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 24, 2015 Emergency Preparedness Working Group (EPWG) Grant * Nevada Field Office funds the EPWG grant based on $.50 per cubic foot of low-level/mixed low-level waste disposed at the Nevada National Security Site * EPWG consists of six Nevada counties: Clark, Elko, Esmeralda, Lincoln, Nye, and White Pine * EPWG addresses grant administration issues and any cross-cutting emergency related questions that incorporate grant funding or are required to attain operations level emergency response

  7. Putting Data to Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hughes, julie@imt.org Director, Building Energy Performance Policy Putting Data to Work 2016 Building Technologies Office Peer Review 2 Project Summary Timeline (NEW PROJECT): Start date: July 15, 2015 Planned end date: July 14, 2018 Key Milestones 1. DC and NYC have committed to using SEED in their ordinance compliance cycles and continuously provide feedback on the Platform to DOE/LBNL; January 2016 2. DC and NYC pilot programs are designed and ready for implementation; June 2016 3. Toolkit

  8. Abandoning wells working group

    SciTech Connect (OSTI)

    1997-03-01

    The primary objective of this working group is to identify major technical, regulatory, and environmental issues that are relevant to the abandonment of offshore wellbores. Once the issues have been identified, the working group also has the objective of making recommendations or providing potential solutions for consideration. Areas for process improvement will be identified and {open_quotes}best practices{close_quotes} will be discussed and compared to {open_quotes}minimum standards.{close_quotes} The working group will primarily focus on wellbore abandonment in the Gulf of Mexico. However, workshop participants are encouraged to discuss international issues which may be relevant to wellbore abandonment practices in the Gulf of Mexico. The Abandoning Wells Group has identified several major areas for discussion that have concerns related to both operators and service companies performing wellbore abandonments in the Gulf of Mexico. The following broad topics were selected for the agenda: (1) MMS minimum requirements and state regulations. (2) Co-existence of best practices, new technology, and P & A economics. (3) Liability and environmental issues relating to wellbore abandonment.

  9. DOE Awards Small Business Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10:00am Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Firm-Fixed Unit Rate Task Order to Sage Energy Trading of Jenks, OK. Sage Energy Trading is a Woman Owned Small Business. The Task Order will have a maximum value of $3.5 million over 2 years. Work performed under this Task Order will be performed at the Portsmouth Gaseous Diffusion Plant in Piketon, OH. The contractor will be

  10. DOE Awards Small Business Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Time and Materials Task Order to Industrial Economics, Incorporated, located in Cambridge, MA. Industrial Economics, Incorporated is a Small Business. The Task Order will have a maximum value of $1.77 million over 3 years. Work performed under this Task Order will be performed at the Los Alamos National Laboratory in Los Alamos, NM.

  11. Scale-invariant entropy-based theory for dynamic ordering

    SciTech Connect (OSTI)

    Mahulikar, Shripad P. E-mail: spm@aero.iitb.ac.in; Kumari, Priti

    2014-09-01

    Dynamically Ordered self-organized dissipative structure exists in various forms and at different scales. This investigation first introduces the concept of an isolated embedding system, which embeds an open system, e.g., dissipative structure and its mass and/or energy exchange with its surroundings. Thereafter, scale-invariant theoretical analysis is presented using thermodynamic principles for Order creation, existence, and destruction. The sustainability criterion for Order existence based on its structured mass and/or energy interactions with the surroundings is mathematically defined. This criterion forms the basis for the interrelationship of physical parameters during sustained existence of dynamic Order. It is shown that the sufficient condition for dynamic Order existence is approached if its sustainability criterion is met, i.e., its destruction path is blocked. This scale-invariant approach has the potential to unify the physical understanding of universal dynamic ordering based on entropy considerations.

  12. Scaling exponents for ordered maxima

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ben-Naim, E.; Krapivsky, P. L.; Lemons, N. W.

    2015-12-22

    We study extreme value statistics of multiple sequences of random variables. For each sequence with N variables, independently drawn from the same distribution, the running maximum is defined as the largest variable to date. We compare the running maxima of m independent sequences and investigate the probability SN that the maxima are perfectly ordered, that is, the running maximum of the first sequence is always larger than that of the second sequence, which is always larger than the running maximum of the third sequence, and so on. The probability SN is universal: it does not depend on the distribution frommore » which the random variables are drawn. For two sequences, SN~N–1/2, and in general, the decay is algebraic, SN~N–σm, for large N. We analytically obtain the exponent σ3≅1.302931 as root of a transcendental equation. Moreover, the exponents σm grow with m, and we show that σm~m for large m.« less

  13. Scaling exponents for ordered maxima

    SciTech Connect (OSTI)

    Ben-Naim, E.; Krapivsky, P. L.; Lemons, N. W.

    2015-12-22

    We study extreme value statistics of multiple sequences of random variables. For each sequence with N variables, independently drawn from the same distribution, the running maximum is defined as the largest variable to date. We compare the running maxima of m independent sequences and investigate the probability SN that the maxima are perfectly ordered, that is, the running maximum of the first sequence is always larger than that of the second sequence, which is always larger than the running maximum of the third sequence, and so on. The probability SN is universal: it does not depend on the distribution from which the random variables are drawn. For two sequences, SN~N–1/2, and in general, the decay is algebraic, SN~N–σm, for large N. We analytically obtain the exponent σ3≅1.302931 as root of a transcendental equation. Moreover, the exponents σm grow with m, and we show that σm~m for large m.

  14. Executive Order 13673 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    673 Executive Order 13673 Executive Order 13673, proposed Federal Acquisition Regulation rule, and proposed Department of Labor guidance are available at: Executive Order 13673 Proposed Federal Acquisition Regulation Rule Proposed Department of Labor Guidance Informational slides about the Executive Order are available below: Executive Order 13673 (176.38 KB)

  15. How it works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How it works MINERvA is a particle physics experiment, located at Fermi National Accelerator Laboratory in Batavia, Illinois. MINERvA was designed to perform high-precision measurements of neutrino interactions on a wide variety of materials, including water, helium, carbon, iron, lead, and plastic. MINERvA is located 100 meters underground, and sits directly in front of the MINOS near detector. The source of MINERvA's neutrino beam is the Neutrinos at the Main Injector beamline, or NuMI. NuMI

  16. INL's '@work' Scientific Glassblower

    SciTech Connect (OSTI)

    Lewis, Russel

    2008-01-01

    INL's '@work' segments feature INL employees and the jobs they perform. This edition features INL's Russell Lewis, a skilled glassblower. Learn more at http://www.facebook.com/idahonationallaboratory. Prepared by Battelle Energy Alliance, LLC under Contract NO.DE-AC07-05ID14517 with the U.S. Department of Energy. The United States Government retains a nonexclusive paid-up, irrevocable, world-wide license to publish or reproduce this video, or allow others to do so, for United States Government Purposes.

  17. HANFORD ENGINEER WORKS

    Office of Legacy Management (LM)

    HANFORD ENGINEER WORKS IJd *P-t - - ~~~ssiticatiC+n cwcetted rat G.E. NUCLEONICS PROJECT xi I ~@L.%&~--G-ENERAI,@ ELECTRIC z ,m ._.__.-. _ I--..-. By Authority of. COMPANY ._ Atmic Energy Commission Office of Hanford Dire&xl Operations Riohland, Washington Attention; Mr. Carleton Shugg, Manager ./ ALPKA-ROLLED EL'GIL%I jw -879 ' . *_ a. f' Richland, Washington February 6, 1948 , Thla Dclc.Jv-<en! :-; . ' - -*...-- f_ ~~~.s No .__. ._. .s / ~. - J-LccIp%. Fr:*? fi This will con&rm

  18. AEO2015 Liquid Fuels Markets Working Group Presentation

    U.S. Energy Information Administration (EIA) Indexed Site

    Assumptions for Annual Energy Outlook 2015: Liquid Fuels Markets Working Group AEO2015 Liquid Fuels Markets Working Group Meeting Office of Petroleum, Natural Gas & Biofuels Analysis July 17, 2014 | Washington, DC WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Discussion topics Office of Petroleum, Natural Gas, & Biofuels Analysis Working Group Presentation for Discussion Purposes Washington DC, July 17, 2014 DO NOT QUOTE OR CITE

  19. Annual Energy Outlook 2016 Renewables Working Group Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Renewables Working Group Preliminary Results Renewables AEO2016 Working Group February 9, 2016| Washington, DC By EIA, Renewable Electricity Analysis Team WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Overview 2 Renewable Electricity Analysis Team February 9, 2016 * Key policy provisions * Update on CPP model representation * Update on status of Leidos capital cost study * Preliminary results WORKING GROUP PRESENTATION FOR DISCUSSION

  20. Order - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Order by Website Administrator application/vnd.openxmlformats-officedocument.wordprocessingml.document icon order template.docx - application/vnd.openxmlformats-officedocument.wordprocessingml.document, 48 KB (49165

  1. Public Order and Safety | Open Energy Information

    Open Energy Info (EERE)

    Safety Jump to: navigation, search Building Type Public Order and Safety Definition Buildings used for the preservation of law and order or public safety. Sub Categories police...

  2. Executive Order 12123 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2123 Executive Order 12123 Document covers the extracted pages of Executive Order 12123. PDF icon eo13123.pdf More Documents & Publications EO 13123-Greening the Government Through ...

  3. Implementation of Executive Order 12114 Environmental Effects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981) Implementation of Executive Order 12114 Environmental ...

  4. Idaho National Engineering Laboratory Consent Order, November...

    Office of Environmental Management (EM)

    Consent Order, November 1, 1995 State Idaho Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Resolve LDR storage violations. Approve the modified "INEL Site...

  5. West Valley Demonstration Project Administrative Consent Order...

    Office of Environmental Management (EM)

    West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 State New York Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Establish ...

  6. Pilot Project Technology Business Case: Mobile Work Packages

    SciTech Connect (OSTI)

    Thomas, Ken; Lawrie, Sean; Niedermuller, Josef

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  7. Panasonic Electric Works Ltd formerly Matsushita Electric Works...

    Open Energy Info (EERE)

    Electric Works Ltd (formerly Matsushita Electric Works) Place: Kadoma-shi, Osaka, Japan Zip: 571-8686 Product: Japanese manufacturer of mainly electric appliances including...

  8. Working Group Report: Sensors

    SciTech Connect (OSTI)

    Artuso, M.; et al.,

    2013-10-18

    Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

  9. How NIF Works

    ScienceCinema (OSTI)

    None

    2010-09-01

    The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

  10. Elevated temperature load-order effects on austenitic steel life predictions

    SciTech Connect (OSTI)

    Weiner, E.O.

    1989-03-01

    The design of nuclear pressure vessel components may typically involve a few hundred or more cyclic thermal loadings of various levels coupled with steady mechanical loads. Ordering of these loading events may not be detailed in the design specification. Thermal loading usually implies plastic deformation, and elevated temperature design must consider creep deformation and damage. Plastic creep solutions are history dependent. Even if some ordering is given in a design specification, practical cost considerations of inelastic analysis may impose a need to group transients. The analyst is frequently faced with the task of showing that his choice of load sequence in an elevated temperature design analysis is a conservative one. In facing such a task, the inelastic strain accumulation and creep-fatigue interaction criteria of the ASME N-47 (ASME 1986) Code Case usually govern. An effort associated with the Fast Flux Test Facility was to study the effects of load ordering the light of these criteria. The effects of a seismic disturbance were included. An additional interest was the effect of the alpha reset hardening modification (Corum, 1987), which prevents undue drift of the yield surface. An effect of reverse plasticity on subsequent creep, the beta effect, was also used. About two hundred inelastic analyses of a thin cylinder were carried out. The scope of work reported in this paper includes a study by J. Phillips (Phillips, 1982), extended with damage calculations. 4 refs., 9 figs., 2 tabs.

  11. LEDSGP/about/working-groups | Open Energy Information

    Open Energy Info (EERE)

    and Process Training for Research Leads Subnational Integration of LEDS Climate Resilience Integration to LEDS Work Stream-Analysis and Tools Development Impacts Assessment...

  12. EM QA Working Group September 2011 Meeting Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Area and QA Resources Focus Area of the EM QA Corporate ... Practices Working Group and Quality Assurance ... of AL6XN Piping * Analysis: - The following causes ...

  13. Reservoir Modeling Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reservoir Modeling Working Group Meeting 2012 GEOTHERMAL TECHNOLOGIES PROGRAM PEER REVIEW ... History Past Meetings: March 2010 IPGT Modeling Working Group Meeting May 2010 GTP Peer ...

  14. CRAD, Work Controls Assessment Plan

    Broader source: Energy.gov [DOE]

    Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed.

  15. Physician Treatment Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Physician Treatment Order Physician Treatment Order FEDERAL OCCUPATIONAL HEALTH Physician Treatment Orders - FOH-24 Form (formerly 229-B) FOH-24 Physician Treatment Orders.pdf (14.87 KB) More Documents & Publications Allergy Injection Policy Handicapped Parking Guidance Before the House Foreign Affairs Subcommittee on Asia, the Pacific and the Global Environment

  16. Exascale Hardware Architectures Working Group

    SciTech Connect (OSTI)

    Hemmert, S; Ang, J; Chiang, P; Carnes, B; Doerfler, D; Leininger, M; Dosanjh, S; Fields, P; Koch, K; Laros, J; Noe, J; Quinn, T; Torrellas, J; Vetter, J; Wampler, C; White, A

    2011-03-15

    The ASC Exascale Hardware Architecture working group is challenged to provide input on the following areas impacting the future use and usability of potential exascale computer systems: processor, memory, and interconnect architectures, as well as the power and resilience of these systems. Going forward, there are many challenging issues that will need to be addressed. First, power constraints in processor technologies will lead to steady increases in parallelism within a socket. Additionally, all cores may not be fully independent nor fully general purpose. Second, there is a clear trend toward less balanced machines, in terms of compute capability compared to memory and interconnect performance. In order to mitigate the memory issues, memory technologies will introduce 3D stacking, eventually moving on-socket and likely on-die, providing greatly increased bandwidth but unfortunately also likely providing smaller memory capacity per core. Off-socket memory, possibly in the form of non-volatile memory, will create a complex memory hierarchy. Third, communication energy will dominate the energy required to compute, such that interconnect power and bandwidth will have a significant impact. All of the above changes are driven by the need for greatly increased energy efficiency, as current technology will prove unsuitable for exascale, due to unsustainable power requirements of such a system. These changes will have the most significant impact on programming models and algorithms, but they will be felt across all layers of the machine. There is clear need to engage all ASC working groups in planning for how to deal with technological changes of this magnitude. The primary function of the Hardware Architecture Working Group is to facilitate codesign with hardware vendors to ensure future exascale platforms are capable of efficiently supporting the ASC applications, which in turn need to meet the mission needs of the NNSA Stockpile Stewardship Program. This issue is

  17. Indian Country Energy and Infrastructure Working Group | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Indian Country Energy and Infrastructure Working Group Indian Country Energy and Infrastructure Working Group The Indian Country Energy and Infrastructure Working Group (ICEIWG) works collaboratively with the U.S. Department of Energy (DOE) Office of Indian Energy to assist in surveys, analysis, and recommendations related to program and policy initiatives that fulfill DOE's statutory authorizations and requirements. About ICEIWG ICEIWG_Jan2016.jpg The working group was established in

  18. Growing ordered and stable nanostructures on polyhedral nanocrystals

    SciTech Connect (OSTI)

    Lu, L. X.; Bharathi, M. S.; Zhang, Y. W.; Upmanyu, M.

    2014-12-22

    Using both theoretical analysis and phase field simulation, we reveal robust and facile self-assembly routes, which allow the growth of different stable and ordered nanostructures on various polyhedral nanocrystals (NCs) heteroepitaxially. Our studies show that by increasing the NC's size, transitions from formal growth to ordered quantum dots on the facets and further to ordered quantum dots on the corners take place. The predicted morphologies and their transitions are in excellent agreement with existing widely scattered experimental results. Our study presents a facile and potentially practical route for mass-producing hybrid NCs with well-defined size, shape, composition, and architecture.

  19. Summary of AEO2015 Renewable Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE February 29, 2016 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Jim Diefenderfer Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Renewable Electricity Analysis Team SUBJECT: Summary of AEO2015 Renewable Electricity Working Group Meeting held on February 9, 2016 Presenter: Chris

  20. Summary of AEO2016 Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE February 10, 2016 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Jim Diefenderfer Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Chris Namovicz Acting Team Leader for Electricity Analysis Team SUBJECT: Summary of AEO2016 Electricity Working Group Meeting held on February 10, 2016

  1. Video Shoot Scope of Work

    Broader source: Energy.gov [DOE]

    Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  2. Clean Energy Works Oregon (CEWO)

    Broader source: Energy.gov [DOE]

    Presents Clean Energy Works Oregon's program background and the four easy steps to lender selection.

  3. Radiation Safety Work Control Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Safety Work Control Form (see instructions on pg-3) Rev. May 2014 Area: Form #: Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers mitigate the radiological hazards introduced by the proposed work? Yes No (b) Can the closed state of the beam line injection stoppers be assured during the proposed work (ie., work does NOT involve injection stoppers or associated HPS)? Yes No If the answers to both questions are yes, the work can be performed safely

  4. Effects of the interplay between atomic and magnetic order on the properties of metamagnetic Ni-Co-Mn-Ga shape memory alloys

    SciTech Connect (OSTI)

    Seguí, C.

    2014-03-21

    Ni-Co-Mn-Ga ferromagnetic shape memory alloys show metamagnetic behavior for a range of Co contents. The temperatures of the structural and magnetic transitions depend strongly on composition and atomic order degree, in such a way that combined composition and thermal treatment allows obtaining martensitic transformation between any magnetic state of austenite and martensite. This work presents a detailed analysis of the effect of atomic order on Ni-Co-Mn-Ga alloys through the evolution of structural and magnetic transitions after quench from high temperatures and during post-quest ageing. It is found that the way in which the atomic order affects the martensitic transformation temperatures and entropy depends on the magnetic order of austenite and martensite. The results can be explained assuming that improvement of atomic order decreases the free energy of the structural phases according to their magnetic order. However, it is assumed in this work that changes in the slope—that is, the entropy—of the Gibbs free energy curves are also decisive to the stability of the two-phase system. The experimental transformation entropy values have been compared with a phenomenological model, based on a Bragg–Williams approximation, accounting for the magnetic contribution. The excellent agreement obtained corroborates the magnetic origin of changes in transformation entropy brought about by atomic ordering.

  5. DOE Awards Task Order to Northern New Mexico Small Business to Develop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Documented Safety Analysis and Technical Safety Requirements Procedures | Department of Energy DOE Awards Task Order to Northern New Mexico Small Business to Develop Documented Safety Analysis and Technical Safety Requirements Procedures DOE Awards Task Order to Northern New Mexico Small Business to Develop Documented Safety Analysis and Technical Safety Requirements Procedures May 16, 2016 - 9:00am Addthis DOE Awards Task Order to Northern New Mexico Small Business to Develop Documented

  6. September 2012, Work Force Retention Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 Protective Force ...

  7. GreenOrder | Open Energy Information

    Open Energy Info (EERE)

    York Zip: 10016 Product: Founded in 2000, GreenOrder is a sustainability strategy and marketing firm References: GreenOrder1 This article is a stub. You can help OpenEI by...

  8. Consent Order EA-2005-01

    Office of Environmental Management (EM)

    ... Final Order upon receipt of said amount referenced in Item 1, above. 4. Bechtel Hanford waives any and all rights to appeal or otherwise seek judicial review of this Consent Order. ...

  9. West Valley Demonstration Project Administrative Consent Order...

    Office of Environmental Management (EM)

    Administrative Order on Consent DOCKET No. II RCRA-3008(h)-I 92-0202 State New York Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Protect human health and the ...

  10. Buildings Working Group Meeting AEO2016 Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Buildings Working Group Meeting Office of Energy Consumption and Efficiency Analysis February 18, 2016 | Washington, DC By Buildings Energy Analysis Team AEO2016 Preliminary Results Discussion purposes only - do not cite or circulate Overview * Key policies - Clean Power Plan - Federal standards and ENERGY STAR specifications * Sector drivers - Fuel prices - Weather - Commercial floorspace * Distributed generation * Residential and commercial consumption AEO2016 Buildings Working Group,

  11. Executive Order 13423- Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It is the policy of ...

  12. DNA Clone Ordering from Shotgun Clone Libraries

    Energy Science and Technology Software Center (OSTI)

    1995-11-28

    CORD is an implementation of an algorithm for determining the order of clones from shotgun clone libraries.

  13. LLNS Beryllium Consent Order Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - LLNS Beryllium Consent Order SUMMARY OF CONSENT ORDER In November 2010, the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) issued a consent order to Lawrence Livermore National Security, LLC (LLNS) for deficiencies related to LLNS's implementation of DOE's Chronic Beryllium Disease Prevention Program (CBDPP) regulation at Lawrence Livermore National Laboratory. The consent order requires LLNS to implement corrective actions that will ensure LLNS meets

  14. On the ability of Order Statistics to distinguish different models for continuum gamma decay

    SciTech Connect (OSTI)

    Sandoval, J. J.; Cristancho, F.

    2007-10-26

    A simulation procedure to calculate some important parameters to the application of Order Statistics in the analysis of continuum gamma decay is presented.

  15. DOE Awards Task Order to Northern New Mexico Small Business to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mexico Small Business to Develop Documented Safety Analysis and Technical Safety Requirements Procedures DOE Awards Task Order to Northern New Mexico Small Business to Develop ...

  16. Antenna factorization in strongly ordered limits

    SciTech Connect (OSTI)

    Kosower, David A.

    2005-02-15

    When energies or angles of gluons emitted in a gauge-theory process are small and strongly ordered, the emission factorizes in a simple way to all orders in perturbation theory. I show how to unify the various strongly ordered soft, mixed soft-collinear, and collinear limits using antenna factorization amplitudes, which are generalizations of the Catani-Seymour dipole factorization function.

  17. STANDING ORDER 1. Standing Order Number: EP-DIV-S0-20222, R.O

    Office of Environmental Management (EM)

    CC;K CLEAR FORM

    STANDING ORDER 1. Standing Order Number: EP-DIV-S0-20222, R.O 2. Standing Order Type: (check one) [8J Division D Facility 3. Applicable Facilities: All EWMO Facilities 4. Standing Order Title: EWMO Legacy TRU Waste Pause 5. Distribution List: (By Functional Title) TA-54 Timely Order Book, Waste Characterization, Reduction, and Repackaging Facility (WCRRF) Timely Order Book, Radioassay and Nondestructive Testing (RANT) Facility Timely Order Book, and Environmental Programs

  18. Subsurface Site Characterization Work Plan for the Rulison Site, Colorado

    Office of Legacy Management (LM)

    Subsurface Site Characterization Work Plan for the Rulison Site, Colorado Controlled Copy No.: Revision No.: 0 October 2004 Approved for public release; further dissemination unlimited. DOE/NV--1009 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at

  19. Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy 5 Work Plan Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan Topics: TA-54 Groundwater Surface water sediment Air Quality NMED Consent Order EMR-FY15-WP - November 19, 2014 (255.83

  20. Environmental Monitoring and Remediation Committee Fiscal Year 2016 Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy 6 Work Plan Environmental Monitoring and Remediation Committee Fiscal Year 2016 Work Plan Topics: Track Lifecycle Baseline Data TA-54 Groundwater Surface water sediment Air Quality NMED Consent Order EM&R-FY16-WP - March 9, 2016 (181.05

  1. Waste Management Committee Fiscal Year 2016 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 6 Work Plan Waste Management Committee Fiscal Year 2016 Work Plan Topics: TA-54 WIPP Recovery Operations Waste Stored at Waste Control Specialists Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY16-WP - March 9, 2016 (107.69

  2. Work with Us | Buildings | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Us At NREL, industry, universities, and government agencies have many opportunities to take advantage of our residential and commercial buildings expertise. Here's how you can work with us to improve the energy efficiency of your buildings. NREL's award-winning work with the commercial and public sectors to improve building energy performance is central to its mission. Learn about our awards. Partner with Us You can work with our experts and use NREL's outstanding facilities and

  3. Training Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Outreach Forums Focus Group and Work Group Activities Focus Group Training Work Group 10 CFR 851 Implementation Work Group Workforce Retention Work Group Strategic Initiatives Work ...

  4. Attachment J-16 Portfolio Management Task Order 14-001

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mod 323 Attachment J-16 Portfolio Management Task Order 14-001 Statement of Work - 1 - Title: AMRP PBS 41 - Project Management / Project Controls Support Revision Number: 0 Date: September 17, 2013 Start: October 1, 2013 Finish: September 30, 2014 1.0 DESCRIPTION Mission Support Alliance (MSA) Portfolio Management (PFM) will provide the following project management/project controls support services as described below. The services will be performed in accordance with Contract DE-AC06-09RL14728,

  5. Working and Net Available Shell Storage Capacity

    U.S. Energy Information Administration (EIA) Indexed Site

    Working and Net Available Shell Storage Capacity May 2016 With Data as of March 31, 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Working and Net Available Shell Storage Capacity as of March 31, 2016 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are

  6. Controlling Molecular Ordering in Solution-State Conjugated Polymers

    SciTech Connect (OSTI)

    Zhu, Jiahua; Han, Youngkyu; Kumar, Rajeev; Hong, Kunlun; Bonnesen, Peter V.; Sumpter, Bobby G.; Smith, Gregory Scott; Ivanov, Ilia N.; Do, Changwoo

    2015-07-17

    Rationally encoding molecular interactions that can control the assembly structure and functional expression in solution of conjugated polymers holds great potential for enabling optimal organic optoelectronic and sensory materials. In this work, we show that thermally-controlled and surfactant-guided assembly of water-soluble conjugated polymers in aqueous solution is a simple and effective strategy to generate optoelectronic materials with desired molecular ordering. We have studied a conjugated polymer consisting of a hydrophobic thiophene backbone and hydrophilic, thermo-responsive ethylene oxide side groups, which shows a step-wise, multi-dimensional assembly in water. By incorporating the polymer into phase-segregated domains of an amphiphilic surfactant in solution, we demonstrate that both chain conformation and degree of molecular ordering of the conjugated polymer can be tuned in hexagonal, micellar and lamellar phases of the surfactant solution. The controlled molecular ordering in conjugated polymer assembly is demonstrated as a key factor determining the electronic interaction and optical function.

  7. Annual Energy Outlook 2014 Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    : Electricity Working Group Meeting September 25, 2013 Electricity Analysis Team Office of Electricity, Coal, Nuclear, and Renewables Analysis Office of Energy Analysis WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Key Modeling updates from AEO2013 * Revised Reserve Margin and Capacity Market Methodology - Explicit Reserve Margin, Explicit Capacity Payment - Results in 3-5 mill higher electric prices * Operating/Spinning reserve

  8. Second AEO2014 Macro-Industrial Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    7, 2013 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS PAUL HOLTBERG TEAM LEADER ANALYSIS INTEGRATION TEAM JAMES TURNURE DIRECTOR OFFICE OF ENERGY CONSUMPTION & EFFICIENCY ANALYSIS LYNN WESTFALL DIRECTOR OFFICE OF ENERGY MARKETS & FINANCIAL ANALYSIS FROM: MACROECONOMIC & INDUSTRIAL ENERGY CONSUMPTION & EFFICIENCY ANALYSIS TEAMS SUBJECT: Second AEO2014 Macro-Industrial Working Group Meeting Summary (presented on 09-26-2013) Attendees: Bob Adler (EIA) Robert

  9. Second AEO2016 Macro-Induistrial Working Group Meeting summary

    U.S. Energy Information Administration (EIA) Indexed Site

    March 21, 2016 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS PAUL HOLTBERG TEAM LEADER ANALYSIS INTEGRATION TEAM JAMES TURNURE DIRECTOR OFFICE OF ENERGY CONSUMPTION & EFFICIENCY ANALYSIS LYNN WESTFALL DIRECTOR OFFICE OF ENERGY MARKETS & FINANCIAL ANALYSIS FROM: MACROECONOMIC & INDUSTRIAL ENERGY CONSUMPTION & EFFICIENCY ANALYSIS TEAMS SUBJECT: Second AEO2016 Macro-Industrial Working Group Meeting Summary, presented on 02-18-2016 Attendees: Nate Aden

  10. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  11. July 2012, Work Force Retention Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group

  12. file://\\\\Bellview\\TeamWorks\\TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    team March 4, 2004 The Big Story Raising crane Topics Characterization News ... Refurbishment of one crane has been successfully completed and work on the second crane is ...

  13. Resonant radiation from oscillating higher order solitons

    SciTech Connect (OSTI)

    Driben, R.; Yulin, A. V.; Efimov, A.

    2015-07-15

    We present radiation mechanism exhibited by a higher order soliton. In a course of its evolution the higher-order soliton emits polychromatic radiation resulting in formation of multipeak frequency comb-like spectral band. The shape and spectral position of this band can be effectively controlled by the relative strength of the third order dispersion. An analytical description is corroborated by numerical simulations. Research showed that for longer pulses the described effect persists also under the action of higher order perturbations such as Raman and self-steepening.

  14. Executive Order 13583, Establishing a Coordinated Government...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13583, Establishing a Coordinated Government-Wide Initiative to Promote Diversity and Inclusion in the Federal Workforce Executive Order 13583, Establishing a Coordinated...

  15. Executive Order 13514: Comprehensive Federal Fleet Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Handbook offers guidance on meeting the fleet management requirements outlined in section 12 of Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic ...

  16. NPS Director's Order | Open Energy Information

    Open Energy Info (EERE)

    NPS Director's Order Author NPS Recipient NPS Published Publisher Not Provided, 02232010 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet...

  17. West Valley Demonstration Project Administrative Consent Order...

    Office of Environmental Management (EM)

    Department of Energy (DOE) enter into this Order regarding ... C. In the event that the terms and conditions of this ... EM HOME | DOE HOME | SEARCH | WEBSITE OUTLINE FEEDBACK ...

  18. Hexagonal Ordering of Nanoparticles | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    electron microscope, researchers can see the hexagonal ordering of nanoparticles in a gold nanoparticle membranes (right). This configuration helps researchers to simulate their...

  19. Engineered Solutions: Order (2010-CE-2112)

    Broader source: Energy.gov [DOE]

    DOE issued an Order after entering into a Compromise Agreement with Engineered Solutions, Inc. to resolve a case involving the failure to certify dehumidifier basic model SD109.

  20. NMED Presentation on Revised Consent Order

    Broader source: Energy.gov [DOE]

    At the November 12, 2015 Special NNMCAB Meeting NMED Secretary Ryan Flynn provided a presentation on the Revisions to the 2005 Order on Consent.

  1. Consent Order, Lawrence Livermore National National Security...

    Office of Environmental Management (EM)

    Lawrence Livermore National National Security, LLC - WCO-2010-01 Consent Order, Lawrence Livermore National National Security, LLC - WCO-2010-01 October 29, 2010 Issued to Lawrence ...

  2. Consent Order, Brookhaven Science Associates, LLC | Department...

    Energy Savers [EERE]

    Consent Order issued to Brookhaven Science Associates, LLC relating to an electrical shock event that occurred at the Brookhaven National Laboratory. On November 23,...

  3. Work For Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-28

    Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1A.

  4. Work For Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-03

    Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. WFO has the following objectives. Cancels DOE O 481.1.

  5. Working with SRNL - Technology Partnerships

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16/2016 SEARCH SRNL GO SRNL Home Technology Partnerships Working with SRNL Technology Partnerships Work for Others and Cooperative Research and Development Agreements SRNL is pleased to provide a variety of business arrangements whereby our technologies or capabilities can be utilized to benefit the general public. We welcome opportunities to bring new technologies to the marketplace by closely working with industry, universities, or state and local government agencies. With its wide spectrum of

  6. Small Business TerranearPMC Awarded $2 Million Task Order | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy TerranearPMC Awarded $2 Million Task Order Small Business TerranearPMC Awarded $2 Million Task Order July 5, 2013 - 10:45am Addthis TerranearPMC at work on anomaly sampling in the 300 Area of Hanford. TerranearPMC at work on anomaly sampling in the 300 Area of Hanford. TerranearPMC is no stranger to working with the government. These graduates of the Department's Mentor Protégé Program founded their company with eye towards working in federal marketplace, with employees who had

  7. REBUILD AMERICA PROGRAM SCOPE OF WORK

    SciTech Connect (OSTI)

    Jeffrey Brown; Bruce Exstrum

    2004-12-01

    This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.

  8. Healthy Housing Opportunities During Weatherization Work

    SciTech Connect (OSTI)

    Wilson, J.; Tohn, E.

    2011-03-01

    In the summer and early fall of 2010, the National Center for Healthy Housing interviewed people from a selection of state and local agencies that perform weatherizations on low-income housing in order to gauge their approach to improving the health and safety of the homes. The interviews provided a strong cross section of what work agencies can do, and how they go about funding this work when funds from the Weatherization Assistance Program (WAP) do not cover the full extent of the repairs. The report also makes recommendations for WAP in how to assist agencies to streamline and maximize the health and safety repairs they are able to make in the course of a standard weatherization.

  9. Housekeeping category corrective action unit work plan

    SciTech Connect (OSTI)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  10. Radiation Safety Work Control Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Safety Work Control Form (see instructions on pg-3) Rev. May 2014 Area: Form : ... Safety Office (namesignaturedate) Radiation Physics (namesignaturedate) Section 4: ...

  11. Module 2- Work Breakdown Structure

    Broader source: Energy.gov [DOE]

    This module defines and illustrates the Work Breakdown Structure (WBS), WBS dictionary, Organizational Breakdown Structure (OBS) and Responsibility Assignment Matrix (RAM).

  12. HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS!

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MEDIATION WORKS Mediation helps to build relationships. People solve their own problems ... It Preserves Relationships You resolve your dispute while building a better relationship ...

  13. INL @ work: Nuclear Reactor Operator

    SciTech Connect (OSTI)

    Russell, Patty

    2008-01-01

    INL @ work features jobs at the Idaho National Laboratory. Learn more about careers and energy research at INL's facebook site http://www.facebook.com/idahonationallaboratory

  14. INL @ work: Nuclear Reactor Operator

    ScienceCinema (OSTI)

    Russell, Patty

    2013-05-28

    INL @ work features jobs at the Idaho National Laboratory. Learn more about careers and energy research at INL's facebook site http://www.facebook.com/idahonationallaboratory

  15. Order, chaos and nuclear dynamics: An introduction

    SciTech Connect (OSTI)

    Swiatecki, W.J.

    1990-08-01

    This is an introductory lecture illustrating by simple examples the anticipated effect on collective nuclear dynamics of a transition from order to chaos in the motions of nucleons inside an idealized nucleus. The destruction of order is paralleled by a transition from a rubber-like to a honey-like behaviour of the independent-particle nuclear model. 10 refs., 6 figs.

  16. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  17. Library API for Z-Order Memory Layout

    Energy Science and Technology Software Center (OSTI)

    2015-02-01

    This library provides a simple-to-use API for implementing an altnerative to traditional row-major order in-memory layout, one based on a Morton- order space filling curve (SFC) , specifically, a Z-order variant of the Morton order curve. The library enables programmers to, after a simple initialization step, to convert a multidimensional array from row-major to Z- order layouts, then use a single, generic API call to access data from any arbitrary (i,j,k) location from within themore » array, whether it it be stored in row- major or z-order format. The motivation for using a SFC in-memory layout is for improved spatial locality, which results in increased use of local high speed cache memory. The basic idea is that with row-major order layouts, a data access to some location that is nearby in index space is likely far away in physical memory, resulting in poor spatial locality and slow runtime. On the other hand, with a SFC-based layout, accesses that are nearby in index space are much more likely to also be nearby in physical memory, resulting in much better spatial locality, and better runtime performance. Numerous studies over the years have shown significant runtime performance gains are realized by using a SFC-based memory layout compared to a row-major layout, sometimes by as much as 50%, which result from the better use of the memory and cache hierarchy that are attendant with a SFC-based layout (see, for example, [Beth2012]). This library implementation is intended for use with codes that work with structured, array-based data in 2 or 3 dimensions. It is not appropriate for use with unstructured or point-based data.« less

  18. WageWorks Screen Shot(s)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WageWorks Screen Shot(s)

  19. Microsoft Word - doe_mirant_order_sierraclub.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20 th , 2006 Mr. Lawrence Mansueti Permitting, Siting, and Analysis Division Office of Electricity Delivery and Energy Reliability Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0119 Dear Mr. Mansueti, This letter is in response to the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC. For over 50 years, and as indicated by Mirant's own

  20. Composite, ordered material having sharp surface features - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal 50,904 Site Map Printable Version Share this resource About Search Categories (15) Advanced Materials Biomass and Biofuels Building Energy Efficiency Electricity Transmission Energy Analysis Energy Storage Geothermal Hydrogen and Fuel Cell Hydropower, Wave and Tidal Industrial Technologies Solar Photovoltaic Solar Thermal Startup America Vehicles and Fuels Wind Energy Partners (27) Visual Patent Search Success Stories Find More Like This Return to Search Composite, ordered

  1. Order Module--DOE O 414.1D, QUALITY ASSURANCE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14.1D, QUALITY ASSURANCE Order Module--DOE O 414.1D, QUALITY ASSURANCE "To ensure that DOE, including NNSA, products and services meet or exceed customers' requirements and expectations. To achieve quality for all work based upon the following principles: All work, as defined in this Order, is conducted through an integrated and effective management system. Management support for planning, organization, resources, direction, and control is essential to quality assurance (QA). Performance

  2. cd ordering | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CD-DVD Ordering System Please complete the following information so the National Energy Technology Lab (NETL) can promptly process your order. Below is a sample of the fields required to order a CD or DVD. If any fields are left blank you may not receive your disk. Data gathered by this form will be used only by the NETL. and will not be distributed for any other purpose. Data transferred via the Internet to this database should not be considered secure. Last Name: Doe First Name: John Middle

  3. Work for Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-24

    Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11.

  4. Orders Granting Natural Gas, LNG & CNG Authorizations Issued...

    Office of Environmental Management (EM)

    Orders Granting Natural Gas, LNG & CNG Authorizations Issued in 2014 Orders Granting Natural Gas, LNG & CNG Authorizations Issued in 2014 Order 3378 - Encana Natural Gas Inc. Order...

  5. AEO 2014 Renewable Electricity Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    DATE: September 30, 2013 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Office of Energy Analysis Alan Beamon Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis FROM: Renewable Electricity Analysis Team SUBJECT: AEO 2014 Renewable Electricity Working Group Meeting Summary ATTENDEES: In person John Conti Alan Beamon Bob Eynon Chris Namovicz Danielle Lowenthal-Savy Erin Boedecker Gwen Bredehoeft Jim Diefenderfer Marie Rinkoski Spangler Michael

  6. Second AEO2014 Transportation Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    , 2013 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS PAUL HOLTBERG TEAM LEADER ANALYSIS INTEGRATION TEAM JIM TURNURE DIRECTOR OFFICE OF ENERGY CONSUMPTION AND EFFICIENCY ANALYSIS FROM: TRANSPORTATION CONSUMPTION & EFFICIENCY ANALYSIS TEAM SUBJECT: Second AEO2014 Transportation Working Group Meeting Summary (presented on 09-25-2013) Attendees: Nicholas Chase (EIA/OECEA) Carrie Hughes-Cromwick (EIA/OES) Paul Holtberg (EIA/OEA) Trisha Hutchins (EIA/OECEA) Jim Kliesch

  7. Summary of AEO2015 Renewable Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    August 13, 2014 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Jim Diefenderfer Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Renewable Electricity Analysis Team SUBJECT: Summary of AEO2015 Renewable Electricity Working Group Meeting held on July 24, 2014 Presenters: Chris Namovicz, Gwen Bredehoeft Topics included AEO2014 model and data updates, a summary of AEO2014 model results,

  8. Summary of First AEO2014 Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    9, 2013 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Alan Beamon Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Electricity Analysis Team SUBJECT: Summary of First AEO 2014 Electricity Working Group Meeting held on July 24, 2013 ATTENDEES: Diefenderfer, Jim Aniti, Lori Milton, Carrie Jones, Jeff Martin, Laura Bredehoeft, Gwendolyn Eynon, Bob Leff, Mike Mellish, Mike Kearney, Diane

  9. Summary of Second AEO 2014 Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    7, 2013 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Alan Beamon Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Electricity Analysis Team SUBJECT: Summary of Second AEO 2014 Electricity Working Group Meeting held on September 25, 2013 ATTENDEES: Adams, Greg (EIA OEA) Aniti, Lori (EIA OEA) Bredehoeft, Gwendolyn (EIA OEA) Crozat, Matthew P. (US DOE: Office of Nuclear Energy)

  10. Peerless-Premier: Order (2014-CE-23007)

    Broader source: Energy.gov [DOE]

    DOE ordered Peerless-Premier Appliance Co. to pay a $8,000 civil penalty after finding Peerless-Premier had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  11. Exploring intertwined orders in cuprate superconductors (Journal...

    Office of Scientific and Technical Information (OSTI)

    YBa2Cu3O6+x and La2-xBaxCuO4, the maximum ordering strength is peaked at the hole concentration of 18 in both cases. There are also possible connections more with the quantum...

  12. Penguin Toilets: Order (2010-CW-1615)

    Broader source: Energy.gov [DOE]

    DOE ordered Penguin Toilets, LLC to pay a $5,000 civil penalty after finding Penguin Toilets had failed to certify that certain models of water closets comply with the applicable water conservation standards.

  13. Neptun Light: Order (2012-SE-3504)

    Broader source: Energy.gov [DOE]

    DOE ordered Neptun Light, Inc. to pay a $13,000 civil penalty after finding Neptun Light had failed to certify that certain models of medium base compact fluorescent lamps comply with the applicable energy conservation standards.

  14. Stiebel Eltron: Order (2010-CE-1711)

    Broader source: Energy.gov [DOE]

    DOE ordered Stiebel Eltron, Inc. to pay a $5,000 civil penalty after finding Stiebel Eltron had failed to certify that certain models of water heaters comply with the applicable energy conservation standards.

  15. Heat Controller: Order (2011-CE-1507)

    Broader source: Energy.gov [DOE]

    DOE ordered Heat Controller, Inc. to pay a $6,000 civil penalty after finding Heat Controller had failed to certify that certain models of room air conditioners comply with the applicable energy conservation standards.

  16. HKC-US: Order (2013-SE-33002)

    Broader source: Energy.gov [DOE]

    DOE ordered HKC-US, LLC to pay a $6,500 civil penalty after finding HKC-US had failed to certify that one basic model of ceiling fan light kit complies with the applicable energy conservation standards.

  17. Jamison Door: Order (2013-CE-5348)

    Broader source: Energy.gov [DOE]

    DOE ordered Jamison Door Company to pay a $6,000 civil penalty after finding Jamison Door had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  18. Clean Cities: Coalitions in Order of Designation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Order Atlanta, GA September 8th, 1993 1 Denver, CO September 13th, 1993 2 Philadelphia, PA September 22nd, 1993 3 Delaware October 12th, 1993 4 Washington, DC October...

  19. Viking Range: Order (2014-CE-23014)

    Broader source: Energy.gov [DOE]

    DOE ordered Viking Range, LLC to pay a $8,000 civil penalty after finding Viking Range had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  20. American Range: Order (2014-CE-23006)

    Broader source: Energy.gov [DOE]

    DOE ordered American Range Corporation to pay a $8,000 civil penalty after finding American Range had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  1. Anthony International: Order (2013-CE-5357)

    Broader source: Energy.gov [DOE]

    DOE ordered Anthony International to pay a $8,000 civil penalty after finding Anthony International had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  2. BSH Home Appliances: Order (2014-CE-23013)

    Broader source: Energy.gov [DOE]

    DOE ordered BSH Home Appliances Corporation to pay a $12,000 civil penalty after finding BSH Home Appliances had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  3. Minka-Aire: Order (2014-CE-32018)

    Broader source: Energy.gov [DOE]

    DOE ordered Minka Lighting Inc. to pay a $8,000 civil penalty after finding Minka had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  4. Refrigerator Manufacturers: Order (2013-CE-5341)

    Broader source: Energy.gov [DOE]

    DOE ordered Refrigerator Manufacturers, LLC to pay a $8,000 civil penalty after finding Refrigerator Manufacturers had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  5. Nostalgia Products: Order (2014-CE-14017)

    Broader source: Energy.gov [DOE]

    DOE ordered Nostalgia Products Group, LLC to pay a $8,000 civil penalty after finding Nostalgia Products had failed to certify that certain models of refrigerators and refrigerator-freezers comply with the applicable energy conservation standards.

  6. Purcell-Murray: Order (2014-CE-23019)

    Broader source: Energy.gov [DOE]

    DOE ordered Purcell-Murray Company, Inc. to pay a $8,000 civil penalty after finding Purcell-Murray had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  7. Commercial Cooler: Order (2013-CE-5343)

    Broader source: Energy.gov [DOE]

    DOE ordered Commercial Cooler, Inc. to pay a $8,000 civil penalty after finding Commercial Cooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  8. USA Manufacturing: Order (2013-CE-5336)

    Broader source: Energy.gov [DOE]

    DOE ordered USA Manufacturing to pay a $8,000 civil penalty after finding USA Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  9. AM Conservation: Order (2010-CW-1415)

    Broader source: Energy.gov [DOE]

    DOE ordered AM Conservation Group, Inc. to pay a $5,000 civil penalty after finding AM Conservation had failed to certify that certain models of showerheads comply with the applicable water conservation standards.

  10. Polar King: Order (2013-CE-5328)

    Broader source: Energy.gov [DOE]

    DOE ordered Polar King International Inc. to pay a $8,000 civil penalty after finding Polar King had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  11. Duro Corporation: Order (2014-CE-23009)

    Broader source: Energy.gov [DOE]

    DOE ordered Duro Corporation to pay a $8,000 civil penalty after finding Duro Corporation had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  12. Quietside Corp: Order (2010-CE-1710)

    Broader source: Energy.gov [DOE]

    DOE ordered Quietside Corporation to pay a $5,000 civil penalty after finding Quietside Corp. had failed to certify that certain models of water heaters comply with the applicable energy conservation standards.

  13. Barclay Products: Order (2013-CW-3005)

    Broader source: Energy.gov [DOE]

    DOE ordered Barclay Products, Ltd. to pay a $8,000 civil penalty after finding Barclay Products had failed to certify that certain models of water closets comply with the applicable water conservation standards.

  14. Bull Outdoor Products: Order (2015-CE-14014)

    Broader source: Energy.gov [DOE]

    DOE ordered Bull Outdoor Products, Inc. to pay a $8,000 civil penalty after finding Bull had failed to certify that refrigerator basic model BC-130 complies with the applicable energy conservation standards.

  15. Excellence Opto: Order (2013-CE-49002)

    Broader source: Energy.gov [DOE]

    DOE ordered Excellence Opto, Inc. to pay a $8,000 civil penalty after finding Excellence Opto had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  16. Eaton Cooper: Order (2015-CE-48003)

    Broader source: Energy.gov [DOE]

    DOE ordered Eaton Cooper Lighting to pay a $8,000 civil penalty after finding Eaton Cooper had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards.

  17. Dade Engineering: Order (2013-CE-5316)

    Broader source: Energy.gov [DOE]

    DOE ordered Dade Engineering Corp. to pay a $8,000 civil penalty after finding Dade Engineering had failed to certify that certain models of walk-in cooler and freezer (WICF) components comply with the applicable energy conservation standards.

  18. Aero-Tech: Order (2010-CE-1012)

    Broader source: Energy.gov [DOE]

    DOE issued an Order and closed this case against Aero-Tech Light Bulb Co., without civil penalty, after DOE found that Aero-Tech manufactured and/or privately labeled incandescent reflector lamps, but did not violate DOE regulations.

  19. Higher order Fokker-Planck operators

    SciTech Connect (OSTI)

    Pomraning, G.C.

    1996-11-01

    If the scattering interaction in linear particle transport problems is highly peaked about zero momentum transfer, a common and often useful approximation is the replacement of the integral scattering operator with the differential Fokker-Planck operator. This operator involves a first derivative in energy and second derivatives in angle. In this paper, higher order Fokker-Planck scattering operators are derived, involving higher derivatives in both energy and angle. The applicability of these higher order differential operators to representative scattering kernels is discussed. It is shown that, depending upon the details of the scattering kernel in the integral operator, higher order Fokker-Planck approximations may or may not be valid. Even the classic low-order Fokker-Planck operator fails as an approximation for certain highly peaked scattering kernels. In particular, no Fokker-Planck operator is a valid approximation for scattering involving the widely used Henyey-Greenstein scattering kernel.

  20. Hunter Fan: Order (2014-CE-32008)

    Broader source: Energy.gov [DOE]

    DOE ordered Hunter Fan Company to pay a $8,000 civil penalty after finding Hunter Fan had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  1. Consent Order EA-2000-09

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Enclosure: Consent Order cc: B. Costner, S-1 D. Michaels, EH-1 S. Cary, EH-1 M. Zacchero, EH-1 S. Hurley, EH-10 D. Stadler, EH-2 F. Russo, EH-23 N. Goldenberg, EH-3 J. Fitzgerald, ...

  2. Artisan Manufacturing: Order (2010-CW-0712)

    Broader source: Energy.gov [DOE]

    DOE ordered Artisan Manufacturing Company, Inc., to pay a $5,000 civil penalty after finding Artisan Manufacturing had failed to certify that certain models of faucets comply with the applicable water conservation standard.

  3. Fagor America: Order (2014-CE-23018)

    Broader source: Energy.gov [DOE]

    DOE ordered Fagor America, Inc. to pay a $6,500 civil penalty after finding Fagor America had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  4. Golden Cooler: Order (2013-CE-5345)

    Broader source: Energy.gov [DOE]

    DOE ordered Golden Cooler to pay a $8,000 civil penalty after finding Golden Cooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  5. Hisense USA: Order (2010-CE-1211)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE issued an Order after entering into a Compromise Agreement with Hisense USA Corp. after finding Hisense USA had failed to certify that certain models of residential refrigerators, refrigerator-freezers, and freezers comply with the applicable energy conservation standards.

  6. Goodman Manufacturing: Order (2012-CE-1509)

    Broader source: Energy.gov [DOE]

    DOE ordered Goodman Manufacturing Company L.P. to pay an $8,000 civil penalty after finding Goodman Manufacturing had failed to certify that certain room air conditioners comply with the applicable energy conservation standard.

  7. MC Appliance: Order (2014-CE-20002)

    Broader source: Energy.gov [DOE]

    DOE ordered MC Appliance Corporation to pay a $16,000 civil penalty after finding MC Appliance had failed to certify that certain models of residential clothes washers and residential clothes dryers comply with the applicable energy conservation standards.

  8. Mackle Company: Order (2011-CE-2102)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered The Mackle Company, Inc., to pay a $6,000 civil penalty after finding Mackle Co. had failed to certify that basic model D110, a clothes dryer, complies with the applicable energy conservation standards.

  9. ORDER 3768: PIERIDAE ENERGY (USA) LTD.

    Broader source: Energy.gov [DOE]

    OPINION AND ORDER GRANTING LONG-TERM, MULTI-CONTRACT AUTHORIZATION TO EXPORT U.S.-SOURCED NATURAL GAS BY PIPELINE TO CANADA FOR LIQUEFACTION AND RE-EXPORT IN THE FORM OF LIQUEFIED NATURAL GAS TO...

  10. Wolverine Brass: Order: (2015-CW-28004)

    Broader source: Energy.gov [DOE]

    DOE ordered Wolverine Brass, Inc. to pay a $8,000 civil penalty after finding Wolverine Brass had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  11. Worker Safety and Health Enforcement Consent Order

    Office of Environmental Management (EM)

    ... requires the written consent of both Parties. 11. CWI waives any and all rights to appeal or otherwise seek judicial or administrative review of the terms of this Consent Order. ...

  12. Manitowoc Foodservice: Order (2012-CE-5309)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Manitowoc Foodservice to pay an $6,000 civil penalty after finding Manitowoc Foodservice had failed to certify that Manitowoc walk-in coolers and freezers (WICFs) and their components comply with the applicable energy conservation standard.

  13. Navien America: Order (2010-CE-1712)

    Broader source: Energy.gov [DOE]

    DOE ordered Navien America, Inc. to pay a $5,000 civil penalty after finding Navien America had failed to certify that certain models of water heaters comply with the applicable energy conservation standards.

  14. Paragon Sales: Order (2012-CE-1417)

    Broader source: Energy.gov [DOE]

    DOE ordered Paragon Sales Co., Inc., to pay a $6,000 civil penalty after finding Paragon Sales had failed to certify that certain models of Liebherr residential freezers comply with the applicable energy conservation standards.

  15. Cal Flame: Order (2015-CE-14015)

    Broader source: Energy.gov [DOE]

    DOE ordered Cal Flame to pay a $8,000 civil penalty after finding Cal Flame had failed to certify that refrigerator basic model BBQ09849P-H complies with the applicable energy conservation standards.

  16. Fagor America: Order (2013-CEW-19001)

    Broader source: Energy.gov [DOE]

    DOE ordered Fagor America, Inc. to pay a $13,000 civil penalty after finding Fagor America had failed to certify that certain models of residential refrigerator-freezers and dishwashers comply with the applicable energy and water conservation standards.

  17. Midea Washing Appliance: Order (2011-CE-1903)

    Broader source: Energy.gov [DOE]

    DOE ordered Midea Washing Appliance Mfg. Co., Ltd. to pay a $6,000 civil penalty after finding Midea Washing Appliance had failed to certify that certain models of dishwashers comply with the applicable energy conservation standards.

  18. Kold Pack: Order (2013-CE-5323)

    Broader source: Energy.gov [DOE]

    DOE ordered Kold Pack, Inc. to pay a $8,000 civil penalty after finding Kold Pack had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  19. Task Order Awarded for Environmental Technical Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for environmental technical services to Professional Project Services, Inc., of Oak Ridge, TN, for support services at the Paducah Gaseous Diffusion Plant located near Paducah, KY.

  20. Living Direct: Order (2011-CE-1904)

    Broader source: Energy.gov [DOE]

    DOE ordered Living Direct, Inc. to pay a $6,000 civil penalty after finding Living Direct had failed to certify that certain models of dishwashers, refrigerator-freezers and freezers comply with the applicable energy conservation standards.

  1. National Comfort Products: Order (2014-SE-16014)

    Broader source: Energy.gov [DOE]

    DOE ordered National Comfort Products to pay a $16,000 civil penalty after finding National Comfort Products had failed to certify that certain models of central air conditioners and heat pumps comply with the applicable energy conservation standards.

  2. Mackle Company: Order (2010-SE-0106)

    Broader source: Energy.gov [DOE]

    DOE ordered Mackle Company, Inc. to pay a $27,200 civil penalty after finding the company had failed to certify that a variety of refrigerators, refrigerator-freezers, and freezers comply with the applicable energy conservation standards.

  3. Distinctive Appliances: Order (2015-CE-14019)

    Broader source: Energy.gov [DOE]

    DOE ordered Distinctive Appliances Distributing, Inc. to pay a $16,000 civil penalty after finding Distinctive Appliances had failed to certify that certain models of Fhiaba-brand refrigerator-freezers comply with the applicable energy conservation standards.

  4. Distinctive Appliances: Order (2014-CE-23020)

    Broader source: Energy.gov [DOE]

    DOE ordered Distinctive Appliances Distributing, Inc. to pay a $8,000 civil penalty after finding Distinctive Appliances had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  5. Explosive Safety Manual, to a New Order

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-12-02

    This memorandum provides justification for the conversion of Department of Energy (DOE) Manual (M) 440.1-1A, DOE Explosives Safety Manual, dated 1-9-06, into a new DOE Order.

  6. Afeel: Order (2010-CW-07/1414)

    Broader source: Energy.gov [DOE]

    DOE ordered Afeel Corporation to pay a $10,000 civil penalty after finding Afeel had failed to certify that certain models of showerheads and faucets comply with the applicable water conservation standards.

  7. AGA Marvel: Order (2011-CE-1905)

    Broader source: Energy.gov [DOE]

    DOE ordered AGA Marvel to pay a $6,000 civil penalty after finding AGA Marvel had failed to certify that certain models of dishwashers comply with the applicable energy conservation standards.

  8. Act One: Order (2013-CE-49001)

    Broader source: Energy.gov [DOE]

    DOE ordered Act One Communications, Inc. to pay a $8,000 civil penalty after finding Act One had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  9. Acme Kitchenettes: Order (2011-CE-1406)

    Broader source: Energy.gov [DOE]

    DOE ordered Acme Kitchenettes Corp. to pay a $6,000 civil penalty after finding Acme Kitchenettes had failed to certify that certain models of refrigerators comply with the applicable energy conservation standards.

  10. GE Appliances: Order (2010-CE-2113)

    Broader source: Energy.gov [DOE]

    DOE issued an Order after entering into a Compromise Agreement with General Electric Appliances after finding GE Appliances had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  11. Danby Products: Order (2012-CE-1415)

    Broader source: Energy.gov [DOE]

    DOE ordered Danby Products to pay a $9,900 civil penalty after finding Danby had failed to certify that certain models of refrigerators and freezers comply with the applicable energy conservation standard.

  12. ET Industries: Order (2012-SE-2902)

    Broader source: Energy.gov [DOE]

    DOE ordered ET Industries, Inc. to pay a $39,000 civil penalty after finding ET Industries had manufactured and distributed in commerce in the U.S. 974 units of basic model TH-1, a noncompliant showerhead.

  13. American Valve: Order (2010-CW-1411)

    Broader source: Energy.gov [DOE]

    DOE ordered American Valve, Inc. to pay a $5,000 civil penalty after finding American Valve had failed to certify that certain showerhead models comply with the applicable water conservation standards.

  14. Basement Systems: Order (2010-CE-2110)

    Broader source: Energy.gov [DOE]

    DOE issued an Order after entering into a Compromise Agreement with Basement Systems, Inc. after finding Basement Systems had failed to certify that certain models of dehumdifiers comply with the applicable energy conservation standards.

  15. Royal Centurion: Order (2012-CE-3608)

    Broader source: Energy.gov [DOE]

    DOE ordered Royal Centurion, Inc., to pay a $8,000 civil penalty after finding Royal Centurion had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  16. Central Moloney: Order (2013-SE-4702)

    Broader source: Energy.gov [DOE]

    DOE ordered Central Moloney, Inc. to pay a $2,500 civil penalty after finding Central Moloney had manufactured and distributed noncompliant liquid-immersed distribution transformers in commerce in the U.S.

  17. Zoe Industries: Order (2010-CW-1405)

    Broader source: Energy.gov [DOE]

    DOE ordered Zoe Industries, Inc. to pay a $5,000 civil penalty after finding Zoe had failed to certify that certain models of showerheads comply with the applicable water conservation standards.

  18. Zoe Industries: Order (2011-SW-2912)

    Broader source: Energy.gov [DOE]

    DOE ordered Zoe Industries, Inc. to pay a $25,000 civil penalty after finding Zoe had manufactured and distributed in commerce in the U.S. at least 2,235 units of basic model 150043, a noncompliant showerhead.

  19. Ramblewood Green: Order (2014-CE-23017)

    Broader source: Energy.gov [DOE]

    DOE ordered Ramblewood Green Ltd. to pay a $8,000 civil penalty after finding Ramblewood Green had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  20. Custom Coolers: Order (2013-CE-5315)

    Broader source: Energy.gov [DOE]

    DOE ordered Custom Coolers, LLC to pay a $8,000 civil penalty after finding Custom Coolers had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  1. Engineered Products: Order (2012-SE-5401)

    Broader source: Energy.gov [DOE]

    DOE ordered Engineered Products Company to pay a $480 civil penalty after finding EPCO had manufactured/privately labeled and distributed in commerce in the U.S. 19 units of basic model 15701, a metal halide lamp fixture.

  2. Allen Co: Order (2010-CW-0715)

    Broader source: Energy.gov [DOE]

    DOE ordered Allen Co. to pay a $5,000 civil penalty after finding Allen Co. had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  3. National Comfort Products: Order (2010-SE-0307)

    Broader source: Energy.gov [DOE]

    DOE ordered National Comfort Products to pay an $8,000 civil penalty after finding NCP had failed to conduct the required testing to certify that certain models of central air conditioners comply with the applicable energy conservation standard.

  4. Capital Cooking: Order (2014-CE-23008)

    Broader source: Energy.gov [DOE]

    DOE ordered Capital Cooking Equipment, Inc. to pay a $8,000 civil penalty after finding Capital Cooking had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  5. Executive Order 11990: Protection Of Wetlands

    Broader source: Energy.gov [DOE]

    In order to avoid to the extent possible the long and short term adverse impacts associated with the destruction or modification of wetlands and to avoid direct or indirect support of new...

  6. Imperial Manufacturing: Order (2013-CE-5322)

    Broader source: Energy.gov [DOE]

    DOE ordered Imperial Manufacturing, Inc. to pay a $8,000 civil penalty after finding Imperial Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  7. Home Depot: Order (2014-CE-32017)

    Broader source: Energy.gov [DOE]

    DOE ordered The Home Depot, Inc. to pay a $8,000 civil penalty after finding Home Depot had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  8. Hudson Reed: Order (2011-SW-2909)

    Broader source: Energy.gov [DOE]

    DOE ordered Hudson Reed, Ltd. to pay a $3,000 civil penalty after finding Hudson Reed had manufactured and distributed in commerce in the U.S. 18 units of basic model HEAD16, a noncompliant showerhead.

  9. Minibar North America: Order (2014-CE-14010)

    Broader source: Energy.gov [DOE]

    DOE ordered Minibar North America, Inc. to pay a $8,000 civil penalty after finding Minibar had failed to certify that certain models of refrigerators comply with the applicable energy conservation standards.

  10. Atlas Lighting: Order (2015-CE-48001)

    Broader source: Energy.gov [DOE]

    DOE ordered Atlas Lighting Products to pay a $6,000 civil penalty after finding Atlas Lighting had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards.

  11. Euro Chef USA: Order (2014-CE-23004)

    Broader source: Energy.gov [DOE]

    DOE ordered Euro Chef USA Inc. to pay a $8,000 civil penalty after finding Euro Chef USA had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  12. EiKO: Order (2011-CE-2702)

    Broader source: Energy.gov [DOE]

    DOE ordered EiKO Ltd. - North America to pay a $6,000 civil penalty after finding EiKO had failed to certify that certain models of incandescent reflector lamps comply with the applicable energy conservation standards.

  13. Jandy Pool Products: Order (2010-CE-1111)

    Broader source: Energy.gov [DOE]

    DOE ordered Jandy Pool Products, Inc. to pay a $10,000 civil penalty after finding Jandy Pool Products had failed to certify that certain models of pool heaters comply with the applicable energy conservation standards.

  14. Executive Order 13007 Indian Sacred Sites (1996)

    Broader source: Energy.gov [DOE]

    Executive Order 13007 Indian Sacred Sites (1996). Designed to protect and preserve Indian religious practices, this EO directs each federal agency that manages federal lands to “(1) accommodate...

  15. K.Grill: Order (2011-SW-2902)

    Broader source: Energy.gov [DOE]

    DOE ordered Kenneth Grill to pay a $10,000 civil penalty after finding Mr. Grill had manufactured and distributed in commerce in the U.S. at least 5,000 noncompliant showerheads.

  16. Cospolich Refrigerator: Order (2013-CE-5314)

    Broader source: Energy.gov [DOE]

    DOE ordered Cospolich Refrigerator Co, Inc. to pay a $8,000 civil penalty after finding Cospolich Refrigerator had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  17. Southeast Cooler: Order (2013-CE-5331)

    Broader source: Energy.gov [DOE]

    DOE ordered Southeast Cooler Corp. to pay a $8,000 civil penalty after finding Southeast Cooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  18. DOE - Fossil Energy: Orders Issued in 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Nations 3127 FE12-71-NG 072412 Iberdrola Renewables, LLC Order Granting Blanket ... Prior Authority 2773 3080 FE12-31-NG 032712 Iberdrola Canada Energy Services, Ltd. ...

  19. Fisher & Paykel: Order (2014-CE-23012)

    Broader source: Energy.gov [DOE]

    DOE ordered Fisher & Paykel Appliances, Inc. to pay a $8,000 civil penalty after finding Fisher & Paykel had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  20. International Refrigeration: Order (2012-CE-1510)

    Broader source: Energy.gov [DOE]

    DOE ordered International Refrigeration Products to pay an $8,000 civil penalty after finding International Refrigeration had failed to certify that certain room air conditioners comply with the applicable energy conservation standard.

  1. Volume International: Order (2014-CE-32014)

    Broader source: Energy.gov [DOE]

    DOE ordered Volume International Corporation to pay a $8,000 civil penalty after finding Volume International had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  2. Consent Order EA-2005-01

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20585 July 28, 2005 Mr. T. E. Logan, President Bechtel Hanford, Inc. 3070 George Washington Way Richland, WA 99352 Consent Order 2005-01 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and Bechtel Hanford, Inc. Dear Mr. Logan: The Department of Energy (DOE) has reviewed Bechtel Hanford, Inc.'s (Bechtel Hanford) investigation and supporting documentation associated with two events occurring at the 618-2 Burial Ground in December 2004. These events resulted in

  3. O:ELECTRICDETROITPP-230-Order.PDF

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INTERNATIONAL TRANSMISSION COMPANY ORDER NO. PP-230 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, operation, maintenance, or connection of electric transmission facilities at the United States international border. There are four international electric transmission lines that interconnect

  4. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  5. B Plant Complex preclosure work plan

    SciTech Connect (OSTI)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

  6. HODIF:High-Order Discretizations, Interpolations and

    Energy Science and Technology Software Center (OSTI)

    2006-06-20

    This software, a library, contains FORTRAN77 subroutines to calculate first and second derivatives up to 8th order, interpolations (1D and 2D) up to 10th order and filters up to 14th order. Only even orders are addressed and finite-difference stencils are implemented on a vertex-centered mesh. The primary aim of this library is to be used in block-structured adaptive mesh simulations where high order is desired. The interpolants in this library are essentially designed to domore » prolongations and restrictions between levels of rfinement - however, they assume that the refinement ratio is 2. The filters are provided to remove high wavenumber content from solutions in case Runge phenomenon occurs - a common occurrence in case of marginal resolution of the solution. Details of the derivation and use are to be found in "Using high-order methods on adaptively refined block-structured meshes - discretizations, interpolations and filters", by J. Ray, C.A. Kennedy, S. Lefantzi and H.N. Najm, Sandia Technical Report, SAND2005-7981. The software comes with a User's Guide and examples how to use it.« less

  7. Audit of Lawrence Livermore National Laboratory orders for memorabilia

    SciTech Connect (OSTI)

    Not Available

    1988-12-23

    We reviewed selected aspects of orders placed by Lawrence Livermore National Laboratory, a Department of Energy contractor, during 1979--1985 for memorabilia, models, and illustrations and the oversight of those orders by the San Francisco Operations Office (SAN). This review extends earlier audit work at a second Department contractor, Rockwell International, Rocky Flats Plant, Engineering Prototype Group, on which we issued a report dated July 12, 1988. That audit focused on the Prototype Group's providing Livermore with illustrations, models, engineering prototypes, and other articles (mementos, plaques, etc.) during October 1977 through September 1985. Issues arose during that audit which required a separate review at SAN and Livermore, to determine specifically: the propriety of, and SAN oversight of, procurement practices followed by Livermore; the basis for the Livermore orders; the adequacy of reimbursement to the Department for silver used in medallions; and the cost ceilings for memorabilia contained in the Department's contract with the University of California, which operates Livermore for the Department. Limiting the audit scope to the orders Livermore placed with Rockwell's Prototype Group, we reviewed Department and Livermore procedures for acquiring memorabilia. In addition to interviewing SAN and Livermore Legal Counsel, Special Material Office personnel, and Research and Development Program representatives, we examined SMO requisitions, accounts payable listings and related payments, and selected research and development correspondences.

  8. Attachment 1 - Performance Work Statement

    National Nuclear Security Administration (NNSA)

    including TTR. Waste acceptance services will be performed at the NNSS and at waste generator sites. DE-SOL-0005982 Attachment 1 Page 1 2. Scope of Work 2.1 Requirement: The EPS...

  9. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  10. Utility Security & Resiliency: Working Together

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses Edison Electric Institute (EEI), including its key security objectives, key activities, cybersecurity activities, and spare transformer equipment program (STEP).

  11. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can...

  12. BEDES Strategic Working Group Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Energy Data Exchange Specification: Strategic Working Group Recommendations Rick Diamond, Robin Mitchell, Andrea Mercado, Shankar Earni, and Lindsay Holiday Lawrence Berkeley National Laboratory Jonathan Raab, Raab Associates October 27, 2014 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of

  13. Annual Energy Outlook 2017 1st Coal Working Group

    U.S. Energy Information Administration (EIA) Indexed Site

    7 1 st Coal Working Group Coal and Uranium Analysis Team August 31, 2016| Washington, D.C. WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES. DO NOT QUOTE OR CITE AS AEO2017 MODELING ASSUMPTIONS AND INPUTS ARE SUBJECT TO CHANGE. Agenda Coal and Uranium Analysis Team August 31, 2016 | Washington, D.C. 2 * EIA ongoing activities * Modeling focus for AEO2017 * Review of AEO2016 results * General Modeling Assumptions - Focus on productivity and other factors affecting price - Feedback from CWG

  14. Eliminating High Risk Work at Hanford | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Eliminating High Risk Work at Hanford Eliminating High Risk Work at Hanford Presentation from the 2015 DOE National Cleanup Workshop by John Ciucci, President and CEO, CH2M HILL Plateau Remediation Company. Eliminating High Risk Work at Hanford (4.77 MB) More Documents & Publications 2013 Congressional Nuclear Cleanup Caucus Briefings 2014 Congressional Nuclear Cleanup Caucus Briefings 2014 Annual Workforce Analysis and Staffing Plan Report - Richland Operations Office

  15. Idaho CERCLA Disposal Facility Complex Compliance Demonstration for DOE Order 435.1

    SciTech Connect (OSTI)

    J. Simonds

    2006-09-01

    This compliance demonstration document provides an analysis of the Idaho CERCLA Disposal Facility (ICDF) Complex compliance with DOE Order 435.1. The ICDF Complex includes the disposal facility (landfill), evaporation pond, admin facility, weigh scale, decon building, treatment systems, and various staging/storage areas. These facilities were designed and are being constructed to be compliant with DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, and Toxic Substances Control Act polychlorinated biphenyl design and construction standards. The ICDF Complex is designated as the central Idaho National Laboratory (INL) facilityyy for the receipt, staging/storage, treatment, and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) waste streams. This compliance demonstration document discusses the conceptual site model for the ICDF Complex area. Within this conceptual site model, the selection of the area for the ICDF Complex is discussed. Also, the subsurface stratigraphy in the ICDF Complex area is discussed along with the existing contamination beneath the ICDF Complex area. The designs for the various ICDF Complex facilities are also included in this compliance demonstration document. These design discussions are a summary of the design as presented in the Remedial Design/Construction Work Plans for the ICDF landfill and evaporation pond and the Staging, Storage, Sizing, and Treatment Facility. Each of the major facilities or systems is described including the design criteria.

  16. file://\\Bellview\TeamWorks\TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8/03 TRU TeamWorks will resume printing on January 8, 2004 | Shipments expected this we December 18, 2003 The Big Story: It's a wrap - 2003 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 12/18/03 at 8:14 a.m.) Shipments scheduled to arrive at

  17. Work for Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-24

    Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11, cancels DOE O 481.1C. Admin Chg 2, dated 3-9-15, cancels DOE O 481.1C Admin Chg 1

  18. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | NRC Officials Visit WIPP Tod A weekly e-newsletter for the Waste Isolation Pilot Plant team September 25, 2003 The Big Story Recertification - a work in progress Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-25-03 at 7:16 a.m.) 21 Shipments

  19. Federal Utility Partnership Working Group Industry Commitment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Group Industry Commitment Federal Utility Partnership Working Group Industry Commitment Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of 1992 and subsequent executive orders. Federal agencies can contact Federal Utility Partnership Working Group utility partners for more information on assistance. Electric Utility Industry Pledge

  20. Fe-based long range ordered alloys

    DOE Patents [OSTI]

    Liu, Chain T; Inouye, Henry; Schaffhauser, Anthony C.

    1980-01-01

    Malleable long range ordered alloys having high critical ordering temperatures exist in the V(Co,Fe).sub.3 and V(Co,Fe,Ni).sub.3 system having the composition comprising by weight 22-23% V, 35-50% Fe, 0-22% Co and 19-40% Ni with an electron density no greater than 8.00. Excellent high temperature properties occur in alloys having compositions comprising by weight 22-23% V, 35-45% Fe, 0-10% Co, 25-35% Ni; 22-23% V, 28-33% Ni and the remainder Fe; and 22-23% V, 19-22% Ni, 19-22% Co and the remainder Fe. The alloys are fabricable by casting, deforming and annealing for sufficient time to provide ordered structure.

  1. Fe-based long range ordered alloys

    DOE Patents [OSTI]

    Liu, C.T.

    Malleable long range ordered alloys with high critical ordering temperatures exist in the V(Co,Fe)/sub 3/ and V(Co,Fe,Ni)/sub 3/ system. The composition comprising by weight 22 to 23% V, 35 to 50% Fe, 0 to 22% Co and 19 to 40% Ni with an electron density no greater than 8.00. Excellent high temperature properties occur in alloys having compositions comprising by weight 22 to 23% V, 35 to 45% Fe, 0 to 10% Co, 25 to 35% Ni; 22 to 23% V, 28 to 33% Ni and the remainder Fe; and 22 to 23% V, 19 to 22% Co and the remainder Fe. The alloys are fabricable by casting, deforming and annealing for sufficient time to provide ordered structure.

  2. Unsymmetric ordering using a constrained Markowitz scheme

    SciTech Connect (OSTI)

    Amestoy, Patrick R.; Xiaoye S.; Pralet, Stephane

    2005-01-18

    We present a family of ordering algorithms that can be used as a preprocessing step prior to performing sparse LU factorization. The ordering algorithms simultaneously achieve the objectives of selecting numerically good pivots and preserving the sparsity. We describe the algorithmic properties and challenges in their implementation. By mixing the two objectives we show that we can reduce the amount of fill-in in the factors and reduce the number of numerical problems during factorization. On a set of large unsymmetric real problems, we obtained the median reductions of 12% in the factorization time, of 13% in the size of the LU factors, of 20% in the number of operations performed during the factorization phase, and of 11% in the memory needed by the multifrontal solver MA41-UNS. A byproduct of this ordering strategy is an incomplete LU-factored matrix that can be used as a preconditioner in an iterative solver.

  3. Coiled tubing working life prediction

    SciTech Connect (OSTI)

    Wu, J.

    1995-12-31

    Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coiled tubing operations. This paper discusses the coiled tubing working life based on one of the coiled tubing life models published in the literature, and compares the results with other models. Certain agreements are found among these models. A group of curves is presented to illustrate the coiled tubing working life affected by coiled tubing size and wall thickness, internal pressure, yield strength, reel diameter, gooseneck radius, operation condition (corrosion) and butt-welded connection (stress concentration). The results show that coiled tubing life can be greatly increased by increasing CT wall thickness and CT strength, while the coiled tubing working life decreases under high internal pressure, corrosion, and butt-weld conditions. These curves can be easily used in estimating coiled tubing life for the field use.

  4. CFCC working group meeting: Proceedings

    SciTech Connect (OSTI)

    1997-12-31

    This report is a compilation of the vugraphs presented at this meeting. Presentations covered are: CFCC Working Group; Overview of study on applications for advanced ceramics in industries for the future; Design codes and data bases: The CFCC program and its involvement in ASTM, ISO, ASME, and military handbook 17 activities; CFCC Working Group meeting (McDermott Technology); CFCC Working Group meeting (Textron); CFCC program for DMO materials; Developments in PIP-derived CFCCs; Toughened Silcomp (SiC-Si) composites for gas turbine engine applications; CFCC program for CVI materials; Self-lubricating CFCCs for diesel engine applications; Overview of the CFCC program`s supporting technologies task; Life prediction methodologies for CFCC components; Environmental testing of CFCCs in combustion gas environments; High-temperature particle filtration ORNL/DCC CRADA; HSCT CMC combustor; and Case study -- CFCC shroud for industrial gas turbines.

  5. Preliminary results for a two-dimensional simulation of the working process of a Stirling engine

    SciTech Connect (OSTI)

    Makhkamov, K.K.; Ingham, D.B.

    1998-07-01

    Stirling engines have several potential advantages over existing types of engines, in particular they can use renewable energy sources for power production and their performance meets the demands on the environmental security. In order to design Stirling Engines properly, and to put into effect their potential performance, it is important to more accurately mathematically simulate its working process. At present, a series of very important mathematical models are used for describing the working process of Stirling Engines and these are, in general, classified as models of three levels. All the models consider one-dimensional schemes for the engine and assume a uniform fluid velocity, temperature and pressure profiles at each plane of the internal gas circuit of the engine. The use of two-dimensional CFD models can significantly extend the capabilities for the detailed analysis of the complex heat transfer and gas dynamic processes which occur in the internal gas circuit, as well as in the external circuit of the engine. In this paper a two-dimensional simplified frame (no construction walls) calculation scheme for the Stirling Engine has been assumed and the standard {kappa}-{var{underscore}epsilon} turbulence model has been used for the analysis of the engine working process. The results obtained show that the use of two-dimensional CFD models gives the possibility of gaining a much greater insight into the fluid flow and heat transfer processes which occur in Stirling Engines.

  6. Work Force Discipline--Withdrawn

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-04-05

    Withdrawn 4-26-14. Significant changes from the Order include the deletion of material included in other documents such as statutes and Federal regulations. In addition, an updated Table of Penalties now includes Smoking, Cyber Security, Standards of Conduct or other Ethical Violations, and the incorporation of the Travel and Purchase Card Guidance dated January 2003.

  7. Long working distance interference microscope

    DOE Patents [OSTI]

    Sinclair, Michael B.; DeBoer, Maarten P.; Smith, Norman F.

    2004-04-13

    Disclosed is a long working distance interference microscope suitable for three-dimensional imaging and metrology of MEMS devices and test structures on a standard microelectronics probe station. The long working distance of 10-30 mm allows standard probes or probe cards to be used. This enables nanometer-scale 3-D height profiles of MEMS test structures to be acquired across an entire wafer. A well-matched pair of reference/sample objectives is not required, significantly reducing the cost of this microscope, as compared to a Linnik microinterferometer.

  8. Schott Gemtron: Order (2013-CE-5358)

    Broader source: Energy.gov [DOE]

    DOE ordered Schott Gemtron Corp. to pay a $6,000 civil penalty after finding Schott Gemtron had failed to certify that the Kodiak model line of walk-in cooler and freezer doors complies with the applicable energy conservation standards.

  9. PermaTherm: Order (2013-CE-5356)

    Broader source: Energy.gov [DOE]

    DOE ordered PermaTherm, Inc. to pay a $8,000 civil penalty after finding PermaTherm had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  10. General Restaurant Equipment: Order (2013-CE-5344)

    Broader source: Energy.gov [DOE]

    DOE ordered General Restaurant Equipment Co. to pay a $8,000 civil penalty after finding General Restaurant Equipment had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  11. Watermark Designs: Order (2010-CW-1404)

    Broader source: Energy.gov [DOE]

    DOE ordered Watermark Designs Holdings, Ltd. d/b/a Watermark Designs, Ltd. to pay a $135,104 civil penalty after finding Watermark Designs had failed to certify that various models of showerheads comply with the applicable water conservation standards.

  12. Commercial Refrigerator Door: Order (2013-CE-5351)

    Broader source: Energy.gov [DOE]

    DOE ordered Commercial Refrigerator Door Company, Inc. to pay a $8,000 civil penalty after finding Commercial Refrigerator Door had failed to certify that a variety of models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  13. Matthews Fan: Order (2014-CE-32012)

    Broader source: Energy.gov [DOE]

    DOE ordered Matthews-Gerbar, Ltd. d/b/a Matthews Fan Company to pay a $8,000 civil penalty after finding Matthews had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  14. Mile High: Order (2012-SE-4501)

    Broader source: Energy.gov [DOE]

    DOE ordered Mile High Equipment, LLC to pay a $17,525 civil penalty after finding Mile High had manufactured and distributed in commerce in the U.S. approximately 109 units of lce-O-Matic brand automatic commercial ice maker basic model ICE2106 FW, HW, a noncompliant product.

  15. Kingspan Insulated Panels: Order (2013-CE-5353)

    Broader source: Energy.gov [DOE]

    DOE ordered Kingspan Insulated Panels, Inc. to pay a $8,000 civil penalty after finding Kingspan Insulated Panels had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  16. Midea America: Order (2014-SEW-20006)

    Broader source: Energy.gov [DOE]

    DOE ordered Midea America Corp. to abide by the terms of the Notice of Noncompliance Determination, issued on December 4, 2014, after finding Midea America had imported and distributed in commerce in the U.S. at least 216 units of basic model MAE80-S1702GPS, a noncompliant residential clothes washer.

  17. Diversified Panel Systems: Order (2013-CE-5346)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Diversified Panel Systems, Inc. to pay a $8,000 civil penalty after finding Diversified Panel Systems had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  18. Advance Energy Technologies: Order (2013-CE-5302)

    Broader source: Energy.gov [DOE]

    DOE ordered Advance Energy Technologies, Inc., to pay a $8,000 civil penalty after finding Advance Energy Technologies had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standard.

  19. Sanden Vendo America: Order (2014-SE-52002)

    Broader source: Energy.gov [DOE]

    DOE ordered Sanden Vendo America Inc. to pay a $6,200 civil penalty after finding Sanden Vendo America had manufactured and distributed in commerce in the U.S. 31 units of Class A refrigerated bottled or canned beverage vending machine model Vue30 (with 1128127 cassette refrigeration deck), a noncompliant product.

  20. R-Cold: Order (2013-CE-5354)

    Broader source: Energy.gov [DOE]

    DOE ordered R-Cold, Inc. to pay a $8,000 civil penalty after finding R-Cold had failed to certify that any basic models of walk-in cooler or freezer components comply with the applicable energy conservation standards.