1

CE 4990 -Construction Scheduling Week 1: Steel Frame Project  

E-Print Network [OSTI]

CE 4990 - Construction Scheduling Week 1: Steel Frame Project Fall 2011 January 13, 2012 Introduction You are a construction manager for a project to build a steel frame for an office building1 of 964 pre-fabricated structural steel members will be used in the construction. The standard bay size

Mukherjee, Amlan

2

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

Resumption of winter-like temperatures saw prices on the spot market at the Henry Hub rise steadily and end the week more than 1.00 per MMBtu higher than the previous week....

3

Kevin Christiansen "This week I got started on different project than I've  

E-Print Network [OSTI]

solar panels from broken calculator panels), and other projects relating on different project than I've been working on in previous weeks. I began." Zach Kruchoski "This week I organized and typed up a paper regarding running

Zanibbi, Richard

4

Weekly  

U.S. Energy Information Administration (EIA) Indexed Site

caused some upward pressure on spot and futures prices early last week. This price rise was short-lived as temperatures remained cooler-than-normal in most other parts of...

5

GRADUATE STUDENT COURSE ASSIGNMENTS Block 0 Analysis ---Fefferman Week 1  

E-Print Network [OSTI]

Lewicka Weeks 1­8 Block 5 Apprentice Program --- Abert Babai May Weeks 1*­4 Week 1 Week 2 Week 3 Week 4­8) Bremer (7­8), Carstea, Gurski, Morris, Rule Block 5 (Apprentice) (weeks 1­4, possibly 5­8) Abouzaid and by mentoring group Name Block Weeks Mentoring Mohammed Abouzaid 5 4 weeks (first 4) Apprentice David Balduzzi 2

May, J. Peter

6

IT PROJECT MANAGEMENT PROGRAM A ten-week program covering best practices in IT project management  

E-Print Network [OSTI]

with managing and working with people such as team composition and leadership, conflict resolution and politics Professional, and the software will also be available in the Institute's dedicated laboratory. YOU WILL LEARN: · Development Methodologies · System Architecture · Organizing and Staffing the Project Team · Conflict

Schaefer, Marcus

7

Cogeneration Project Analysis Update  

E-Print Network [OSTI]

in the project. For the typical system, as shown in Figure 2, sulfur and NOx are the prime fuel related environmental concerns. Another fuel related concern, which may surface during operation is the opacity of the exhaust. However, if the system is well... designed, this should not be a problem; Depending on the type of system and fuel used, you may need to treat the stack gases to be in compliance. This in itself will increase the project cost and complicate the system operation. Fuel Cost Criteria Ve...

Robinson, A. M.; Garcia, L. N.

8

The Tariff Analysis Project: A Database and Analysis Platform...  

Open Energy Info (EERE)

Tariff Analysis Project: A Database and Analysis Platform for Electricity Tariffs Jump to: navigation, search Tool Summary LAUNCH TOOL Name: The Tariff Analysis Project: A Database...

9

Project Information Form Project Title Modeling for Local Impact Analysis  

E-Print Network [OSTI]

Project Information Form Project Title Modeling for Local Impact Analysis University University Research and Educational Foundation- $48,683.00 Total Project Cost $48,683.00 Agency ID or Contract Number Project We will develop a traffic simulation model for the Los Angeles region that will allow us

California at Davis, University of

10

Project Management and Analysis Project Conception and Execution  

E-Print Network [OSTI]

by the World Bank at a cost of $ 600,000. The objectives of the project are: Analyze the supply and demandTD 608 Project Management and Analysis Part I Project Conception and Execution Milind Sohoni Discussion () January 29, 2008 1 / 3 #12;The K-East Ward Water Project Proceed to the web location: www

Sohoni, Milind

11

Project Management and Analysis Project Conception and Execution  

E-Print Network [OSTI]

TD 608 Project Management and Analysis Part I Project Conception and Execution Milind Sohoni of the paper? How does the author compare India and Pakistan? Do you agree with the cost-benefit analysis? What are your criticisms? Compare the CBA with our 6-goat system. Comment on the viability of the project

Sohoni, Milind

12

Agricultural capital project analysis system  

E-Print Network [OSTI]

analysis. Three specific objectives were established: (1) To select the most suitable procedures for economic and finan- cial evaluation of agricultural projects in developing countries, in- cluding the incorporation of an appropriate sensitivity..., Mercedes and Segismundo Lopez. TABLE OF CONTENTS INTRODUCTION General Objectives Procedure Page 1 1 3 4 LITERATURE REVIEW Evaluation Financial Evaluation Payback Period Accounting Rate of Return Net Present Value Internal Rate of Return...

Lopez, Ramon Antonio

2012-06-07T23:59:59.000Z

13

University of Calgary -Schulich School of Engineering Project 3 -Week Lookahead (Feb.17,11)  

E-Print Network [OSTI]

18 A200Z- Ceiling edge trim (done) M 19 A200Z- Install water fountain/water bottle filler afew weeks stair - lights (done) 32 Level 4 exit stair - ceiling tile (done) 33 ENA 1Z- Remove heater in ceiling (done)(CR165) 34 ENA 12Y- Relocate new sprinkler head (done) (CR165) 35 ENA112Y- New cabinet heater

Garousi, Vahid

14

Risk analysis for tunneling projects  

E-Print Network [OSTI]

Tunnel construction is increasing world wide. Although the majority of tunnel construction projects have been completed safely, there have been several incidents that have resulted in delays, cost overruns, and sometimes ...

Sousa. Rita L

2010-01-01T23:59:59.000Z

15

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 13 February, Noon Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

16

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 1 February, 2012 Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

17

Security Analysis and Project Management Systems | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security Analysis and Project Management Systems SHARE Security Analysis and Project Management Systems ORNL brings together the subject matter experts with programmers to design,...

18

Earned Value Management System (EVMS) and Project Analysis Standard...  

Broader source: Energy.gov (indexed) [DOE]

Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)- March 2014 Earned Value Management System (EVMS) and Project Analysis Standard Operating...

19

Data Analysis from Ground Source Heat Pump Demonstration Projects...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Analysis from Ground Source Heat Pump Demonstration Projects Data Analysis from Ground Source Heat Pump Demonstration Projects Comparison of building energy use before and after...

20

Construction project delay-analysis techniques  

E-Print Network [OSTI]

of this rcscarch bcncfit different parties among the construction industry such as the owners, dcsigncrs, contractors, and lawyers. DEDICATION For my parents, Haya and Mohammad, whose love and support have guided me throughout and carried me at times. Fo&r... OWNER PROJECT 3 AS-BUILT WITHOUT DELAY SCHEDULE APPENDIX D PUBLIC OWNER 3 SNAPSHOT SCHEDULE ON APRIL 21, 1997 . APPENDIX E PUBLIC OWNER 3 SNAPSHOT SCHEDULE ON MAY 10 ", 1997. APPENDIX F PUBLIC OWNER 3 DELAY-ANALYSIS USING ANALYSIS...

Al-Humaidi, Hanouf M

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Project 3 Integrative Genomics (IG) Objective: To give a presentation of about 40-90 minutes duration at the end of the week covering the  

E-Print Network [OSTI]

Project 3 ­ Integrative Genomics (IG) Objective: To give a presentation of about 40-90 minutes duration at the end of the week covering the key aspects of the integrative genomics, which is the combined) "Integrative Genomics and Functional Explanation" downloadable from http://www.stats.ox.ac.uk/research/genome

Goldschmidt, Christina

22

DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project...  

Broader source: Energy.gov (indexed) [DOE]

Delivery High-Pressure Tanks and Analysis Project Review Meeting DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting On February 8-9, 2005, the Department...

23

GM Project G.6 October 20009 -1 9. ANALYSIS OF THE FATALITY PROJECTIONS  

E-Print Network [OSTI]

GM Project G.6 October 20009 - 1 9. ANALYSIS OF THE FATALITY PROJECTIONS In this chapter, we offer the perspective of the four major components of the projections: growths in population, increases in VMT, growth to the fatality projections in Section 9.1. None of these major components is directly amenable to policy

24

Lac Courte Oreilles Energy Analysis Project  

SciTech Connect (OSTI)

The Lac Courte Oreilles Tribe applied for first step funding in 2007 and was awarded in October of that year. We wanted to perform an audit to begin fulfilling two commitments we made to our membership and resolutions that we adopted. One was the Kyoto Protocol and reduce our carbon emissions by 25% and to produce 25% of our energy by sustainable means. To complete these goals we needed to begin with first assessing what our carbon emissions are and begin taking the steps to conserve on the energy we currently use. The First Step Grant gave us the opportunity to do this. Upon funding the Energy Project was formed under the umbrella of the LCO Public Works Department and Denise Johnson was hired as the coordinator. She quickly began fulfilling the objectives of the project. Denise began by contact the LCO College and hiring interns who were able to go to each Tribal entity and perform line logging to read and document the energy used for each electrical appliance. Data was also gathered for one full year from each entity for all their utility bills (gasoline, electric, natural gas, fuel oil, etc.). Relationships were formed with the Green Team and other Green Committees in the area that could assist us in this undertaking. The Energy Task Force was of great assistance as well recommending other committees and guidance to completing our project. The data was gathered, compiled and placed into spreadsheets that would be understandable for anyone who didn't have a background in Renewable Resources. While gathering the data Denise was also looking for ways to conserve energy usage, policies changes to implement and any possible viable renewable energy resources. Changes in the social behaviors of our members and employees will require further education by workshops, energy fairs, etc.. This will be looked into and done in coordination with our schools. The renewable resources seem most feasible are wind resources as well as Bio Mass both of which need further assessment and funding to do so will be sought. While we already are in ownership of a Hydro Dam it is currently not functioning to its full capacity we are seeking operation and maintenance firm proposals and funding sources. One of our biggest accomplishment this project gave us was our total Carbon Emissions 9989.45 tons, this will be the number that we will use to base our reductions from. It will help us achieve our goals we have set for ourselves in achieving the Kyoto Protocol and saving our Earth for our future generations. Another major accomplishment and lesson learned is we need to educate ourselves and our people on how to conserve energy to both impact the environment and our own budgets. The Lac Courte Oreilles (LCO) Energy Analysis Project will perform an energy audit to gather information on the Tribe's energy usage and determine the carbon emissions. By performing the audit we will be able to identify areas where conservation efforts are most viable and recommend policies that can be implemented. These steps will enable LCO to begin achieving the goals that have been set by the Tribal Governing Board and adopted through resolutions. The goals are to reduce emissions by 25% and to produce 25% of its energy using sustainable sources. The project objectives were very definitive to assist the Tribe in achieving its goals; reducing carbon emissions and obtaining a sustainable source of energy. The following were the outlined objectives: (1) Coordinate LCO's current and future conservation and renewable energy projects; (2) Establish working relationships with outside entities to share information and collaborate on future projects; (3) Complete energy audit and analyze LCO's energy load and carbon emissions; (4) Identify policy changes, education programs and conservation efforts which are appropriate for the LCO Reservation; and (5) Create a plan to identify the most cost effective renewable energy options for LCO.

Leslie Isham; Denise Johnson

2009-04-01T23:59:59.000Z

25

Interpretation of Water Sample Analysis, Waunita Hot Spring Project...  

Open Energy Info (EERE)

R. H. Carpenter (Colorado Geological Survey in Cooperation with the U.S. Department of Energy). 1981. Interpretation of Water Sample Analysis, Waunita Hot Spring Project,...

26

Project Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV and Other  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) US DOT $36,442 Total Project Cost $36,442 Agency IDProject Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV of Research Project Zero-emission vehicles (ZEVs) are expected to play a critical role in decarbonizing light

California at Davis, University of

27

Introduction to GIS and Geospatial Analysis Project Presentation  

E-Print Network [OSTI]

GIS 551 Introduction to GIS and Geospatial Analysis Fall 2011 Project Presentation Date Presenter and White-tailed Deer Analysis and Management Plan Using GIS 12-8 Amy Urbanovsky & Ricardo Romero Bike Racks

Hung, I-Kuai

28

Introduction to GIS and Geospatial Analysis Project Presentation  

E-Print Network [OSTI]

GIS 551 Introduction to GIS and Geospatial Analysis Fall 2012 Project Presentation Date Presenter Zhengyi Wang GIS Tools for Hydrology Analysis 12-6 Ross Maynard Melissa Bozarth Using GIS to Evaluate

Hung, I-Kuai

29

analysis tools project: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A; Sang, M 2001-01-01 40 Design of a Data Analysis System for Walking Robots. A Design Project Report Engineering Websites Summary: Design of a Data Analysis System for Walking...

30

Project Analysis under Sustainability* by Richard T. Woodward  

E-Print Network [OSTI]

Project Analysis under Sustainability* by Richard T. Woodward Department of Agricultural Economics to this paper. The editorial assistance of Michele Zinn is gratefully acknowledged. #12;Project Analysis under on and demonstrates linkages between these approaches. First, we derive benefit-cost type criteria for marginal

Woodward, Richard T.

31

Data Projections for the Analysis and Visualisation of Bioinformatics Data  

E-Print Network [OSTI]

Data Projections for the Analysis and Visualisation of Bioinformatics Data Karen Lees Linacre, describes my own research. #12;Karen Lees Doctor of Philosophy Linacre College Hilary Term 2008 Data Projections for the Analysis and Visualisation of Bioinformatics Data Abstract The development of high

Roberts, Stephen

32

Status of NINJA: the Numerical INJection Analysis project  

E-Print Network [OSTI]

The 2008 NRDA conference introduced the Numerical INJection Analysis project (NINJA), a new collaborative effort between the numerical relativity community and the data analysis community. NINJA focuses on modeling and searching for gravitational wave signatures from the coalescence of binary system of compact objects. We review the scope of this collaboration and the components of the first NINJA project, where numerical relativity groups shared waveforms and data analysis teams applied various techniques to detect them when embedded in colored Gaussian noise.

Benjamin Aylott; John G. Baker; William D. Boggs; Michael Boyle; Patrick R. Brady; Duncan A. Brown; Bernd Brgmann; Luisa T. Buchman; Alessandra Buonanno; Laura Cadonati; Jordan Camp; Manuela Campanelli; Joan Centrella; Shourov Chatterjis; Nelson Christensen; Tony Chu; Peter Diener; Nils Dorband; Zachariah B. Etienne; Joshua Faber; Stephen Fairhurst; Benjamin Farr; Sebastian Fischetti; Gianluca Guidi; Lisa M. Goggin; Mark Hannam; Frank Herrmann; Ian Hinder; Sascha Husa; Vicky Kalogera; Drew Keppel; Lawrence E. Kidder; Bernard J. Kelly; Badri Krishnan; Pablo Laguna; Carlos O. Lousto; Ilya Mandel; Pedro Marronetti; Richard Matzner; Sean T. McWilliams; Keith D. Matthews; R. Adam Mercer; Satyanarayan R. P. Mohapatra; Abdul H. Mrou; Hiroyuki Nakano; Evan Ochsner; Yi Pan; Larne Pekowsky; Harald P. Pfeiffer; Denis Pollney; Frans Pretorius; Vivien Raymond; Christian Reisswig; Luciano Rezzolla; Oliver Rinne; Craig Robinson; Christian Rver; Luca Santamara; Bangalore Sathyaprakash; Mark A. Scheel; Erik Schnetter; Jennifer Seiler; Stuart L. Shapiro; Deirdre Shoemaker; Ulrich Sperhake; Alexander Stroeer; Riccardo Sturani; Wolfgang Tichy; Yuk Tung Liu; Marc van der Sluys; James R. van Meter; Ruslan Vaulin; Alberto Vecchio; John Veitch; Andrea Vicer; John T. Whelan; Yosef Zlochower

2009-05-26T23:59:59.000Z

33

Introduction to GIS and Geospatial Analysis Project Presentation  

E-Print Network [OSTI]

GIS 551 Introduction to GIS and Geospatial Analysis Fall 2009 Project Presentation Date Presenter-03 Huiqing Li Yungfei Li Hydrological Analysis of Alto Watershed, Texas 12-03 Erica Lundberg Wes Ward T Fire Department Service Call Density and Location Analysis 12-10 Rachel Blodgett Kelly Searles SFA

Hung, I-Kuai

34

Causal Network Methods for Integrated Project Portfolio Risk Analysis  

E-Print Network [OSTI]

V NETWORK MEASURES FOR PROJECT RISK ANALYSIS ............... 85 5.1 Measures of the General Project Risk Model......................................................... 86 5.2 Task Dependency Measures... ................................................................................... 91 5.2.1 Task Parent Matrix .......................................................................................... 92 5.2.2 Task Grandparent Matrix ................................................................................ 93 5.2.3 Task...

Govan, Paul

2014-08-06T23:59:59.000Z

35

Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet describes the National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth.

Not Available

2014-11-01T23:59:59.000Z

36

Coupled Site Characterization and Foundation Analysis Research Project  

E-Print Network [OSTI]

Engineering Department Bronx, New York, U.S.A. March 2000 #12;Coupled Site Characterization and Foundation Engineering Department Bronx, NY 10471-4098 U.S.A. e-mail: #12;iii Coupled SiteCoupled Site Characterization and Foundation Analysis Research Project: Rational Selection

Horvath, John S.

37

Assessment of Smolt Condition for Travel Time Analysis Project, 1987-1997 Project Review.  

SciTech Connect (OSTI)

The assessment of Smolt Condition for Travel Time Analysis Project (Bonneville Power Administration Project 87-401) monitored attributes of salmonid smolt physiology in the Columbia and Snake River basins from 1987 to 1997, under the Northwest Power Planning Council Fish and Wildlife Program, in cooperation with the Smolt Monitoring Program of the Fish Passage Center. The primary goal of the project was to investigate the physiological development of juvenile salmonids related to migration rates. The assumption was made that the level of smolt development, interacting with environmental factos such as flow, would be reflected in travel times. The Fish Passage Center applied the physiological measurements of smolt condition to Water Budget management, to regulate flows so as to decrease travel time and increase survival.

Schrock, Robin M.; Hans, Karen M.; Beeman, John W. [US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA

1997-12-01T23:59:59.000Z

38

Post Project Analysis of a Restored Reach of Redwood Creek  

E-Print Network [OSTI]

benchmark for stream restoration projects (Dunne & the stream inventory two restoration projects have production stream. Two restoration projects have

Docto, Mia; Corvillon, Daniela Pena

2012-01-01T23:59:59.000Z

39

UMTRA project water sampling and analysis plan, Tuba City, Arizona  

SciTech Connect (OSTI)

Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site.

NONE

1996-02-01T23:59:59.000Z

40

SNF fuel retrieval sub project safety analysis document  

SciTech Connect (OSTI)

This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed.

BERGMANN, D.W.

1999-02-24T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Data Collection & Analysis for ARRA Fuel Cell Projects (Presentation)  

SciTech Connect (OSTI)

The data analysis objectives are: (1) Independent assessment of technology, focused on fuel cell system and hydrogen infrastructure:performance, operation, and safety; (2) Leverage data processing and analysis capabilities from the fuel cell vehicle Learning Demonstration project and DoD Forklift Demo; (3) Establish a baseline of real-world fuel cell operation and maintenance data and identify technical/market barriers; (4) Support market growth of fuel cell technologies by reporting on technology features relevant to the business case; and (5) Report on technology to fuel cell and hydrogen communities and stakeholders.

Kurtz, J.; Ramsden, T.; Wipke, K.; Sprik, S.

2009-08-21T23:59:59.000Z

42

UMTRA project water sampling and analysis plan -- Shiprock, New Mexico  

SciTech Connect (OSTI)

Water sampling and analysis plan (WSAP) is required for each U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide a basis for ground water and surface water sampling at disposal and former processing sites. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring stations at the Navaho Reservation in Shiprock, New Mexico, UMTRA Project site. The purposes of the water sampling at Shiprock for fiscal year (FY) 1994 are to (1) collect water quality data at new monitoring locations in order to build a defensible statistical data base, (2) monitor plume movement on the terrace and floodplain, and (3) monitor the impact of alluvial ground water discharge into the San Juan River. The third activity is important because the community of Shiprock withdraws water from the San Juan River directly across from the contaminated alluvial floodplain below the abandoned uranium mill tailings processing site.

Not Available

1994-02-01T23:59:59.000Z

43

100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT  

SciTech Connect (OSTI)

On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.

HARRINGTON RA

2010-01-15T23:59:59.000Z

44

UMTRA project water sampling and analysis plan, Maybell, Colorado  

SciTech Connect (OSTI)

This water sampling and analysis plan (WSAP) describes planned water sampling activities and provides the regulatory and technical basis for ground water sampling in 1994 at the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Maybell, Colorado. The WSAP identifies and justifies sampling locations, analytical parameters, and sampling frequencies at the site. The ground water data will be used for site characterization and risk assessment. The regulatory basis for the ground water and surface water monitoring activities is derived from the EPA regulations in 40 CFR Part 192 (1993) and the proposed EPA standards of 1987 (52 FR 36000). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. This WSAP also includes a summary and the results of water sampling activities from 1989 through 1992 (no sampling was performed in 1993).

Not Available

1994-06-01T23:59:59.000Z

45

Sampling and Analysis Plan - Waste Treatment Plant Seismic Boreholes Project  

SciTech Connect (OSTI)

This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the basalt, up to three new deep rotary boreholes through the basalt and sedimentary interbeds, and one corehole through the basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities.

Reidel, Steve P.

2006-05-26T23:59:59.000Z

46

UMTRA project water sampling and analysis plan, Monument Valley, Arizona  

SciTech Connect (OSTI)

The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters.

Not Available

1994-04-01T23:59:59.000Z

47

Sampling and Analysis Plan Waste Treatment Plant Seismic Boreholes Project.  

SciTech Connect (OSTI)

This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the Saddle Mountains Basalt, up to three new deep rotary boreholes through the Saddle Mountains Basalt and sedimentary interbeds, and one corehole through the Saddle Mountains Basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities. Revision 3 incorporates all interim change notices (ICN) that were issued to Revision 2 prior to completion of sampling and analysis activities for the WTP Seismic Boreholes Project. This revision also incorporates changes to the exact number of samples submitted for dynamic testing as directed by the U.S. Army Corps of Engineers. Revision 3 represents the final version of the SAP.

Brouns, Thomas M.

2007-07-15T23:59:59.000Z

48

Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet describes National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth. Participating fuel cell developers share price information about their fuel cell products and/or raw fuel cell test data related to operations, maintenance, and safety with NREL via the Hydrogen Secure Data Center (HSDC). The limited-access, off-network HSDC houses the data and analysis tools to protect proprietary information. NREL shares individualized data analysis results as detailed data products (DDPs) with the partners who supplied the data. Aggregated results are published as composite data products (CDPs), which show the technology status without identifying individual companies. The CDPs are a primary benchmarking tool for the U.S. Department of Energy and other stakeholders interested in tracking the status of fuel cell technologies. They highlight durability advancements, identify areas for continued development, and help set realistic price expectations at small-volume production.

Not Available

2013-06-01T23:59:59.000Z

49

Analysis & Projections - U.S. Energy Information Administration...  

U.S. Energy Information Administration (EIA) Indexed Site

that project energy consumption for marketed energy sources plus distributed solar and geothermal energy. Both the RDM and CDM include projections of energy consumption by...

50

Draft of Preliminary Syllabus Applying Geospatial Analysis-Project Based Learning  

E-Print Network [OSTI]

Draft of Preliminary Syllabus Applying Geospatial Analysis- Project Based Learning Listed as, and analysis (2) formulate and evaluate research questions relating to geospatial approaches (3) learn geospatial techniques (4) learn data management, data conversion, and data analysis (5) apply geospatial

Fabrikant, Sara Irina

51

NGNP Project Regulatory Gap Analysis for Modular HTGRs  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) Project Regulatory Gap Analysis (RGA) for High Temperature Gas-Cooled Reactors (HTGR) was conducted to evaluate existing regulatory requirements and guidance against the design characteristics specific to a generic modular HTGR. This final report presents results and identifies regulatory gaps concerning current Nuclear Regulatory Commission (NRC) licensing requirements that apply to the modular HTGR design concept. This report contains appendices that highlight important HTGR licensing issues that were found during the RGA study. The information contained in this report will be used to further efforts in reconciling HTGR-related gaps in the NRC licensing structure, which has to date largely focused on light water reactor technology.

Wayne Moe

2011-09-01T23:59:59.000Z

52

Crossing innovation & product projects management: A comparative analysis in automotive industry  

E-Print Network [OSTI]

1 Crossing innovation & product projects management: A comparative analysis in automotive industry Keywords: organizational learning, new product projects portfolio, innovation management, automotive in automotive industry INTRODUCTION Projectification and platform approaches have been two main transformation

Paris-Sud XI, Université de

53

Value of Information Analysis Project Gnome Site, New Mexico  

SciTech Connect (OSTI)

The Project Gnome site in southeastern New Mexico was the location of an underground nuclear detonation in 1961 and a hydrologic tracer test using radionuclides in 1963. The tracer test is recognized as having greater radionuclide migration potential than the nuclear test because the tracer test radionuclides (tritium, 90Sr, 131I, and 137Cs) are in direct contact with the Culebra Dolomite aquifer, whereas the nuclear test is within a bedded salt formation. The tracer test is the topic here. Recognizing previous analyses of the fate of the Gnome tracer test contaminants (Pohll and Pohlmann, 1996; Pohlmann and Andricevic, 1994), and the existence of a large body of relevant investigations and analyses associated with the nearby Waste Isolation Pilot Plant (WIPP) site (summarized in US DOE, 2009), the Gnome Site Characterization Work Plan (U.S. DOE, 2002) called for a Data Decision Analysis to determine whether or not additional characterization data are needed prior to evaluating existing subsurface intrusion restrictions and determining long-term monitoring for the tracer test. Specifically, the Work Plan called for the analysis to weigh the potential reduction in uncertainty from additional data collection against the cost of such field efforts.

Greg Pohll; Jenny Chapman

2010-01-01T23:59:59.000Z

54

E-Print Network 3.0 - analysis project 1987-1997 Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program - US Part (US LHC) Collection: Physics 32 September 2007 Page 1 of 2 UH SYSTEM PROJECT EVALUATION PROCEDURES MANUAL Summary: categories: Program Needs Analysis...

55

GM Project G.6 4 -1 October 2000 4. ANALYSIS OF DATA SETS  

E-Print Network [OSTI]

GM Project G.6 4 - 1 October 2000 4. ANALYSIS OF DATA SETS 4.1 INTRODUCTION We concentrated/functional limitations, and crashes/fatalities. Because of the need to project results based on age groups, gender the various data sets. Although population projections were available from the U.S. Census Bureau, no other

56

Valuation of Governmental Guarantee in BOT Project Finance with Real Option Analysis  

E-Print Network [OSTI]

.......................................................................................... 80 6.2 Basic Assumptions in a BOT Project Valuation .................................. 80 6.3 Data Collection..................................................................................... 83 6.4 Method 1 - Valuation of BOT Project... with NPV Analysis.................. 84 6.5 Method 2 - Valuation of BOT Project with Cheah and Liu?s Real Option Model ....................................................................................... 87 6.6 Method 3 - Valuation of BOT...

Jun, Jae Bum

2010-01-14T23:59:59.000Z

57

analysis project evaluating: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

uncertainties in typical oil and gas projects: 1. The oil price, 2. The investments (capex) and operating. The oil and gas reserves and production profiles, 5. The production...

58

Project Visual Analysis for the Allegheny National Forest1  

E-Print Network [OSTI]

formulation for vegetative impacts over recent years have been inconsistent. · Most inventory and assessment. It will be applied on projects such as timber cuttings, right-of-way clearings, oil well clearings and borrow source in designing the project. With experi- ence, we may add other guides as well as devel- op inventory criteria

Standiford, Richard B.

59

Class 18: Wed. Apr. 3: Toxic Substances Control Act and Cost/Benefit Analysis Class Project on TSCA  

E-Print Network [OSTI]

1 Class 18: Wed. Apr. 3: Toxic Substances Control Act and Cost/Benefit Analysis Class Project on TSCA This project element will examine how technologies you are studying. Each project team will focus on the microorganisms

Iglesia, Enrique

60

An analysis of battery electric vehicle production projections  

E-Print Network [OSTI]

In mid 2008 and early 2009 Deutsche Bank and The Boston Consulting Group each released separate reports detailing projected Battery Electric Vehicle production through 2020. These reports both outlined scenarios in which ...

Cunningham, John Shamus

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Advance Seismic Data Analysis Program: (The "Hot Pot Project")  

Broader source: Energy.gov [DOE]

DOE Geothermal Peer Review 2010 - Presentation. Project objectives: To improve geothermal well target selection and reduce drilling risk through an innovative and advanced analytical method for interpreting seismic data to locate deep geothermal structures.

62

From Federal Computer Week:  

National Nuclear Security Administration (NNSA)

Federal Computer Week: Energy agency launches performance-based pay system By Richard W. Walker Published on March 27, 2008 The Energy Department's National Nuclear Security...

63

Highway Traffic Noise Analysis and Abatement Guidelines The purpose of this project is to  

E-Print Network [OSTI]

Highway Traffic Noise Analysis and Abatement Guidelines The purpose of this project is to: (1 AND ABATEMENT GUIDELINE. HDOT's 1997 noise policy has to be reviewed and updated in order to allow for relief or Federal-Aid highway projects to construct traffic noise abatement measures on existing highways

Prevedouros, Panos D.

64

Mill and mercantile conversions : a case study analysis of residential adaptive re-use projects  

E-Print Network [OSTI]

Three case studies are used as a qualitative tool to analyze the successful conversion of these types of buildings. Analysis will consider physical dimension, building structure, capital structure, and project costs, ...

Schaumburg, Zach E. (Zach Edwin), 1975-

2003-01-01T23:59:59.000Z

65

analysis ninja project: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

camera motion, novel view synthesis is representation of a spacetime image in a spherical solid and its analysis. In spherical space-time representation Tokyo, University of 112...

66

Week 1 Lecture Global TIES Intro: Nuts `n Bolts  

E-Print Network [OSTI]

Global TIES budget $300 Funding Source 1 Funding Source 2 Total Funding for Project $300 DonatedWeek 1 Lecture Global TIES Intro: Nuts `n Bolts September 30, 2011 #12;Course Structure · Friday responsibility · Overall commitment ~8hrs/week #12;Lecture Schedule Week Date Topic 1 9/30 Global TIES Intro

Fainman, Yeshaiahu

67

Structural Analysis and Design Calculations for Hogan Project  

E-Print Network [OSTI]

Live Load Load Case 4: DL + WL With Cp = + 0.9 Load Case 5: DL + WL With Cp = - 0.3 The following. Introduction 2. Load calculations a. Dead Load b. Live Load c. Snow Load d. Wind Load e. Summary 3. Finite Element Model Analysis a. Element Description b. Loads c. Analysis i. Load Case 2 Truss Substructure ii

Mobasher, Barzin

68

Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2  

SciTech Connect (OSTI)

This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment.

BEVINS, R.R.

2000-03-24T23:59:59.000Z

69

MotorWeek  

ScienceCinema (OSTI)

In 2008, PBS's MotorWeek, television's original automotive magazine, visited Argonne's Transportation Technology R&D Center "to learn what it really takes to make clean power sources a viable reality."

None

2013-04-19T23:59:59.000Z

70

UMTRA project water sampling and analysis plan, Durango, Colorado  

SciTech Connect (OSTI)

Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

Not Available

1994-01-01T23:59:59.000Z

71

RETScreen Clean Energy Project Analysis Software | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar PowerstoriesNrelPartnerType Jump to:Co JumpRETScreen Clean Energy Project

72

Weekly Digest Guide The Weekly Digest is YSM's weekly events newsletter, distributed early  

E-Print Network [OSTI]

Weekly Digest Guide The Weekly Digest is YSM's weekly events newsletter, distributed early each Friday morning to 9,000+ email recipients on the Yale campus. The Weekly Digest includes approximately. Timeline The Weekly Digest is published on Fridays for events taking place the following week. Lead time

Lee, Daeyeol

73

Analysis Results for ARRA Projects: Enabling Fuel Cell Market Transformation (Presentation)  

SciTech Connect (OSTI)

This presentation discusses analysis results for American Recovery and Reinvestment Act early market fuel cell deployments and describes the objective of the project and its relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; technical accomplishments including publication of a fourth set of composite data products; and collaborations and future work.

Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-06-01T23:59:59.000Z

74

1 Energy Markets and Policy Group Energy Analysis Department The Impact of Wind Power Projects  

E-Print Network [OSTI]

1 Energy Markets and Policy Group · Energy Analysis Department The Impact of Wind Power Projects, Wind & Hydropower Technologies Program #12;2 Energy Markets and Policy Group · Energy Analysis Concerns for Wind Energy Fall Into Three Potential Categories 1. Area Stigma: Concern that rural areas

Firestone, Jeremy

75

Hydrogen engine performance analysis project. Second annual report  

SciTech Connect (OSTI)

Progress in a 3 year research program to evaluate the performance and emission characteristics of hydrogen-fueled internal combustion engines is reported. Fifteen hydrogen engine configurations will be subjected to performance and emissions characterization tests. During the first two years, baseline data for throttled and unthrottled, carburetted and timed hydrogen induction, Pre IVC hydrogen-fueled engine configurations, with and without exhaust gas recirculation (EGR) and water injection, were obtained. These data, along with descriptions of the test engine and its components, the test apparatus, experimental techniques, experiments performed and the results obtained, are given. Analyses of other hydrogen-engine project data are also presented and compared with the results of the present effort. The unthrottled engine vis-a-vis the throttled engine is found, in general, to exhibit higher brake thermal efficiency. The unthrottled engine also yields lower NO/sub x/ emissions, which were found to be a strong function of fuel-air equivalence ratio. (LCL)

Adt, Jr., R. R.; Swain, M. R.; Pappas, J. M.

1980-01-01T23:59:59.000Z

76

Remote-Handled Low Level Waste Disposal Project Alternatives Analysis  

SciTech Connect (OSTI)

This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energys mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

David Duncan

2010-10-01T23:59:59.000Z

77

Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet describes opportunities for leading fuel cell industry partners from the United States and abroad to participate in an objective and credible fuel cell technology performance and durability analysis by sharing their raw fuel cell test data related to operations, maintenance, safety, and cost with the National Renewable Energy Laboratory via the Hydrogen Secure Data Center.

Not Available

2013-01-01T23:59:59.000Z

78

Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2  

SciTech Connect (OSTI)

This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope.

BEVINS, R.R.

2000-09-20T23:59:59.000Z

79

Project Programming and Commissioning as a Risk Mitigation and Threat Analysis Tool  

E-Print Network [OSTI]

procedures and 2 Jeff Schantz, AIA Director of Science and Technology Hellmuth, Obata and Kassabaum speaking on the benefits of Risk Threat Analysis in the commissioning process for Biological Defense and First Response Facilities. ICEBO2006, Shenzhen...?s lifecycle. Prior risk mitigation procedures typically focused on the physical aspects of a project and a process to protect function and cost. In today?s world, the risk to the project from naturally occurring environmental threats (weather...

Weiss, M. L.

2006-01-01T23:59:59.000Z

80

The Tariff Analysis Project: A database and analysis platform forelectricity tariffs  

SciTech Connect (OSTI)

Much of the work done in energy research involves ananalysis of the costs and benefits of energy-saving technologies andother measures from the perspective of the consumer. The economic valuein particular depends on the price of energy (electricity, gas or otherfuel), which varies significantly both for different types of consumers,and for different regions of the country. Ideally, to provide accurateinformation about the economic value of energy savings, prices should becomputed directly from real tariffs as defined by utility companies. Alarge number of utility tariffs are now available freely over the web,but the complexity and diversity of tariff structures presents aconsiderable barrier to using them in practice. The goal of the TariffAnalysis Project (TAP) is to collect andarchive a statistically completesample of real utility tariffs, and build a set of database and web toolsthat make this information relatively easy to use in cost-benefitanalysis. This report presentsa detailed picture of the current TAPdatabase structure and web interface. While TAP has been designed tohandle tariffs for any kind of utility service, the focus here is onelectric utilities withinthe United States. Electricity tariffs can bevery complicated, so the database structures that have been built toaccommodate them are quite flexible and can be easily generalized toother commodities.

Coughlin, K.; White, R.; Bolduc, C.; Fisher, D.; Rosenquist, G.

2006-05-12T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Hanford Isotope Project strategic business analysis Cesium-137 (Cs-137)  

SciTech Connect (OSTI)

The purpose of this business analysis is to address the beneficial reuse of Cesium 137 (Cs-137) in order to utilize a valuable national asset and possibly save millions of tax dollars. Food irradiation is the front runner application along with other uses. This business analysis supports the objectives of the Department of Energy National Isotope Strategy distributed in August 1994 which describes the DOE plans for the production and distribution of isotope products and services. As part of the Department`s mission as stated in that document. ``The Department of Energy will also continue to produce and distribute other radioisotopes and enriched stable isotopes for medical diagnostics and therapeutics, industrial, agricultural, and other useful applications on a businesslike basis. This is consistent with the goals and objectives of the National Performance Review. The Department will endeavor to look at opportunities for private sector to co-fund or invest in new ventures. Also, the Department will seek to divest from ventures that can more profitably or reliably be operated by the private sector.``

NONE

1995-10-01T23:59:59.000Z

82

Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade  

SciTech Connect (OSTI)

This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical.

Rhea, T.A.; Rucker, T.L. [Science Applications International Corp., Oak Ridge, TN (United States); Stafford, M.W. [NUS Corp., Aiken, SC (US)

1990-09-28T23:59:59.000Z

83

Is it Worth it? A Comparative Analysis of Cost-Benefit Projections for State Renewables Portfolio Standards  

E-Print Network [OSTI]

Benefit Projections for State Renewables Portfolio Standards2006 Introduction State renewables portfolio standards (RPS)Analysis for Meeting a 20% Renewables Portfolio Standard by

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2006-01-01T23:59:59.000Z

84

Technical Analysis of Projects Being Funded by the DOE Hydrogen Program  

SciTech Connect (OSTI)

In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

Edward G. Skolnik

2006-02-10T23:59:59.000Z

85

Power system analysis project Modeling and Sizing optimization of Stand-alone  

E-Print Network [OSTI]

Power system analysis project Modeling and Sizing optimization of Stand-alone photovoltaic/wind-in, cut-out wind speed and rated power, into the optimization based on the real load of the site and write wind turbine is used to adopt its advantage of low noise and relatively low requirement of the quality

Lavaei, Javad

86

Spent nuclear fuel project - criteria document spent nuclear fuel final safety analysis report  

SciTech Connect (OSTI)

The criteria document provides the criteria and planning guidance for developing the Spent Nuclear Fuel (SNF) Final Safety Analysis Report (FSAR). This FSAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, installation acceptance testing, startup, and operation of the SNF Project facilities (K Basins, Cold Vacuum Drying Facility, and Canister Storage Building).

MORGAN, R.G.

1999-02-23T23:59:59.000Z

87

Asclepios: a Research Project-Team at INRIA for the Analysis and Simulation of Biomedical  

E-Print Network [OSTI]

Asclepios: a Research Project-Team at INRIA for the Analysis and Simulation of Biomedical Images N objectives are described and illustrated in this article. 1 Introduction 1.1 The revolution of biomedical is supported by a continually increasing number of biomedical devices providing in vivo measurements

Paris-Sud XI, Université de

88

HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT INCREASED LIQUID LEVEL ANALYSIS FOR 241-AP TANK FARMS  

SciTech Connect (OSTI)

The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the SDT System at Hanford. The "Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Project" is in support of Tri-Party Agreement Milestone M-48-14.

MACKEY TC; DEIBLER JE; JOHNSON KI; PILLI SP; KARRI NK; RINKER MW; ABATT FG; CARPENTER BG

2007-02-16T23:59:59.000Z

89

Weekly Refiner Net Production  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"Click worksheet9,1,50022,3,,,,6,1,,781Title: Telephone:short version) Themonthly4BlenderWeeklyNet

90

Weekly User Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption byAbout PrintableBlender Net ProductionNet ProductionWeekly User

91

Weekly User Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption byAbout PrintableBlender Net ProductionNet ProductionWeekly

92

Busy Week | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareersEnergy,ServicesBurningOperationsBusy Week May 17, 2013

93

Information Visualization Graduate Project (Group Project)  

E-Print Network [OSTI]

Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

Rusu, Adrian

94

UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1  

SciTech Connect (OSTI)

Planned, routine ground water sampling activities for calendar year 1995 to 1997 at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Naturita, Colorado, are described in this water sampling and analysis plan. The following plan identifies and justifies the sampling locations, analytical parameters, detection limits, sampling frequency, and specific rationale for each routine monitoring station at the site. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.

NONE

1995-09-01T23:59:59.000Z

95

UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1  

SciTech Connect (OSTI)

Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.

NONE

1995-09-01T23:59:59.000Z

96

Orientation Week Events School of Computer Science  

E-Print Network [OSTI]

Orientation Week Events School of Computer Science September 8th ­ September 12th Monday 8th:00­16:00 Jack Cole 1.33a/b Computer Science Junior Honours Project Briefing MSc 14:30­16:30 John Honey 110 MSc to First Year Computer Science Students 1 10:15­10:45 John Honey 110 First Year Systems Briefing 4 10

Brierley, Andrew

97

2013 Wind Week | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataCombinedDepartment ofCareersWindProject Management3 Awards20133 Wind Week

98

Supplement analysis 2 of environmental impacts resulting from modifications in the West Valley Demonstration Project  

SciTech Connect (OSTI)

The West Valley Demonstration Project, located in western New York, has approximately 600,000 gallons of liquid high-level radioactive waste (HLW) in storage in underground tanks. While corrosion analysis has revealed that only limited tank degradation has taken place, the failure of these tanks could release HLW to the environment. Congress requires DOE to demonstrate the technology for removal and solidification of HLW. DOE issued the Final Environmental Impact Statement (FEIS) in 1982. The purpose of this second supplement analysis is to re-assess the 1982 Final Environmental Impact Statement's continued adequacy. This report provides the necessary and appropriate data for DOE to determine whether the environmental impacts presented by the ongoing refinements in the design, process, and operations of the Project are considered sufficiently bounded within the envelope of impacts presented in the FEIS and supporting documentation.

NONE

1998-06-23T23:59:59.000Z

99

SLUDGE TREATMENT PROJECT ENGINEERED CONTAINER RETRIEVAL AND TRANSFER SYSTEM PRELIMINARY DESIGN HAZARD ANALYSIS SUPPLEMENT 1  

SciTech Connect (OSTI)

This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

FRANZ GR; MEICHLE RH

2011-07-18T23:59:59.000Z

100

HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SEISMIC ANALYSIS OF HANFORD DOUBLE SHELL TANKS  

SciTech Connect (OSTI)

M&D Professional Services, Inc. (M&D) is under subcontract to Pacific Northwest National Laboratories (PNNL) to perform seismic analysis of the Hanford Site Double-Shell Tanks (DSTs) in support of a project entitled Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Analyses. The original scope of the project was to complete an up-to-date comprehensive analysis of record of the DST System at Hanford in support of Tri-Party Agreement Milestone M-48-14. The work described herein was performed in support of the seismic analysis of the DSTs. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). Although Milestone M-48-14 has been met, Revision I is being issued to address external review comments with emphasis on changes in the modeling of anchor bolts connecting the concrete dome and the steel primary tank. The work statement provided to M&D (PNNL 2003) required that a nonlinear soil structure interaction (SSI) analysis be performed on the DSTs. The analysis is required to include the effects of sliding interfaces and fluid sloshing (fluid-structure interaction). SSI analysis has traditionally been treated by frequency domain computer codes such as SHAKE (Schnabel, et al. 1972) and SASSI (Lysmer et al. 1999a). Such frequency domain programs are limited to the analysis of linear systems. Because of the contact surfaces, the response of the DSTs to a seismic event is inherently nonlinear and consequently outside the range of applicability of the linear frequency domain programs. That is, the nonlinear response of the DSTs to seismic excitation requires the use of a time domain code. The capabilities and limitations of the commercial time domain codes ANSYS{reg_sign} and MSC Dytran{reg_sign} for performing seismic SSI analysis of the DSTs and the methodology required to perform the detailed seismic analysis of the DSTs has been addressed in Rinker et al (2006a). On the basis of the results reported in Rinker et al. (2006a), it is concluded that time-domain SSI analysis using ANSYS{reg_sign} is justified for predicting the global response of the DSTs. The most significant difference between the current revision (Revision 1) of this report and the original issue (Revision 0) is the treatment of the anchor bolts that tie the steel dome of the primary tank to the concrete tank dome.

MACKEY TC; RINKER MW; CARPENTER BG; HENDRIX C; ABATT FG

2009-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Energy and Society Week 3 Section Solution  

E-Print Network [OSTI]

Wh and the power plant has a conversion efficiency of 30%. Coal has an energy density of 29.3x106 J/kg. Before1 9/7/2014 Energy and Society Week 3 Section Solution 3. ENERGY BASICS AND UNIT ANALYSIS (ONLY to office hours soon. Energy versus Power - Work refers to an activity involving a force and movement

Kammen, Daniel M.

102

UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1  

SciTech Connect (OSTI)

Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR {section}40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site`s long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell`s initial performance is in accordance with design requirements.

NONE

1995-09-01T23:59:59.000Z

103

Supplement to the UMTRA Project water sampling and analysis plan, Riverton, Wyoming  

SciTech Connect (OSTI)

This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Riverton (DOE, 1994). Further, the supplement serves to confirm the Project`s present understanding of the site relative to the hydrogeology and contaminant distribution as well as the intent to continue to use the sampling strategy as presented in the 1994 WSAP document for Riverton. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 and 60 FR 2854. Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Riverton site are the Riverton Baseline Risk Assessment (BLRA) (DOE, 1995a) and the Riverton Site Observational Work Plan (SOWP) (DOE, 1995b).

NONE

1995-09-01T23:59:59.000Z

104

Supplement to the UMTRA Project water sampling and analysis plan, Monument Valley, Arizona  

SciTech Connect (OSTI)

This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Riverton (DOE, 1994). Further, the supplement serves to confirm the Project`s present understanding of the site relative to the hydrogeology and contaminant distribution as well as the intent to continue to use the sampling strategy as presented in the 1994 WSAP document for Riverton. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 and 60 FR 2854. Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Riverton site are the Riverton Baseline Risk Assessment (BLRA) (DOE, 1995a) and the Riverton Site Observational Work Plan (SOWP) (DOE, 1995b).

NONE

1995-09-01T23:59:59.000Z

105

Wind-electric icemaking project: Analysis and dynamometer testing. Volume 1  

SciTech Connect (OSTI)

The wind/hybrid systems group at the National Renewable Energy Laboratory has been researching the most practical and cost-effective methods for producing ice from off-grid wind-electric power systems. The first phase of the project, conducted in 1993--1994, included full-scale dynamometer and field testing of two different electric ice makers directly connected to a permanent magnet alternator. The results of that phase were encouraging and the second phase of the project was launched in which steady-state and dynamic numerical models of these systems were developed and experimentally validated. The third phase of the project was the dynamometer testing of the North Star ice maker, which is powered by a 12-kilowatt Bergey Windpower Company, Inc., alternator. This report describes both the second and third project phases. Also included are detailed economic analyses and a discussion of the future prospects of wind-electric ice-making systems. The main report is contained in Volume 1. Volume 2 consists of the report appendices, which include the actual computer programs used in the analysis and the detailed test results.

Holz, R.; Gervorgian, V.; Drouilhet, S.; Muljadi, E.

1998-07-01T23:59:59.000Z

106

Wind-electric icemaking project: Analysis and dynamometer testing. Volume 2  

SciTech Connect (OSTI)

The wind/hybrid systems group at the National Renewable Energy Laboratory has been researching the most practical and cost-effective methods for producing ice from off-grid wind-electric power systems. The first phase of the project, conducted in 1993--1994, included full-scale dynamometer and field testing of two different electric ice makers directly connected to a permanent magnet alternator. The results of that phase were encouraging and the second phase of the project was launched in which steady-state and dynamic numerical models of these systems were developed and experimentally validated. The third phase of the project was the dynamometer testing of the North Star ice maker, which is powered by a 12-kilowatt Bergey Windpower Company, Inc., alternator. This report describes both the second and third project phases. Also included are detailed economic analyses and a discussion of the future prospects of wind-electric ice-making systems. The main report is contained in Volume 1. Volume 2 consists of the report appendices, which include the actual computer programs used in the analysis and the detailed test results.

Holz, R.; Gervorgian, V.; Drouilhet, S.; Muljadi, E.

1998-07-01T23:59:59.000Z

107

UCPath Project Status Report Report Date May 25, 2012 Project Director  

E-Print Network [OSTI]

finalized and will be posted next week. Functional SMEs are focused on analysis of functional gaps. The UCPath Center project team is rapidly ramping up while also making progress in the technology identified at each location to provide local leadership and coordination. In addition, the Shared Technology

Russell, Lynn

108

HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT SEISMIC ANALYSIS OF HANFORD DOUBLE SHELL TANKS  

SciTech Connect (OSTI)

M&D Professional Services, Inc. (M&D) is under subcontract to Pacific Northwest National Laboratory (PNNL) to perform seismic analysis of the Hanford Site double-shell tanks (DSTs) in support of a project entitled ''Double-Shell Tank (DSV Integrity Project--DST Thermal and Seismic Analyses)''. The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST system at Hanford in support of Tri-Party Agreement Milestone M-48-14, The work described herein was performed in support of the seismic analysis of the DSTs. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). The work statement provided to M&D (PNNL 2003) required that the seismic analysis of the DSTs assess the impacts of potentially non-conservative assumptions in previous analyses and account for the additional soil mass due to the as-found soil density increase, the effects of material degradation, additional thermal profiles applied to the full structure including the soil-structure response with the footings, the non-rigid (low frequency) response of the tank roof, the asymmetric seismic-induced soil loading, the structural discontinuity between the concrete tank wall and the support footing and the sloshing of the tank waste. The seismic analysis considers the interaction of the tank with the surrounding soil and the effects of the primary tank contents. The DSTs and the surrounding soil are modeled as a system of finite elements. The depth and width of the soil incorporated into the analysis model are sufficient to obtain appropriately accurate analytical results. The analyses required to support the work statement differ from previous analysis of the DSTs in that the soil-structure interaction (SSI) model includes several (nonlinear) contact surfaces in the tank structure, and the contained waste must be modeled explicitly in order to capture the fluid-structure interaction behavior between the primary tank and contained waste.

MACKEY, T.C.

2006-03-17T23:59:59.000Z

109

Safety and Environment Considerations and Analysis Safety and environmental issues are being considered up front in the APEX project as  

E-Print Network [OSTI]

Safety and Environment Considerations and Analysis Safety and environmental issues are being considered up front in the APEX project as designs evolve so that the goal of safety and environmental attractiveness is realized. Designing safety into the concepts as was done in the ITER project [1] results

California at Los Angeles, University of

110

Emergency Work Y N LBNL Subcontractor Pre-Task Hazard Analysis Company Name: Project Name: Location: Date: .  

E-Print Network [OSTI]

Emergency Work Y N LBNL Subcontractor Pre-Task Hazard Analysis Company Name: Project Name: Location: Company Name: Date: LBNL P/M: LBNL LBNL CSE: LBNL Pg 1 of 2 -Over- 12/12 #12;PTHA Guide Hazards Controls

Eisen, Michael

111

Analysis of 2009 ENR Best Projects in Texas to Determine the Impact of Project Delivery System Used  

E-Print Network [OSTI]

and builder. The only criterion for builder selection is ?lowest construction cost?. Procurement of the builder happens after completion of design documents (Konchar, M. & Sanvido, V. 1998).. 2) Competitive Sealed Proposals (CSP): This PDM is same...) The construction speed of DBB projects can be predicted using two variables: gross floor area and adequacy of the contractor?s plant and equipment. 4) The construction speed of D-B projects can be predicted using two variables: gross floor area and extent...

Rajan, Navaneethan

2011-02-22T23:59:59.000Z

112

Vehicle Technologies' Fact of the Week 2012  

SciTech Connect (OSTI)

Each week the U.S. Department of Energy s Vehicle Technology Office (VTO) posts a Fact of the Week on their website: http://www1.eere.energy.gov/vehiclesandfuels/ . These Facts provide statistical information, usually in the form of charts and tables, on vehicle sales, fuel economy, gasoline prices, and other transportation-related trends. Each Fact is a stand-alone page that includes a graph, text explaining the significance of the data, the supporting information on which the graph was based, and the source of the data. A link to the current week s Fact is available on the VTO homepage, but older Facts are archived and still available at: http://www1.eere.energy.gov/vehiclesandfuels/facts/. This report is a compilation of the Facts that were posted during calendar year 2012. The Facts were written and prepared by staff in Oak Ridge National Laboratory's Center for Transportation Analysis.

Davis, Stacy Cagle [ORNL; Diegel, Susan W [ORNL; Moore, Sheila A [ORNL; Boundy, Robert Gary [ORNL

2013-02-01T23:59:59.000Z

113

Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects  

SciTech Connect (OSTI)

Buildings rarely perform as intended, resulting in energy use that is higher than anticipated. Building commissioning has emerged as a strategy for remedying this problem in non-residential buildings. Complementing traditional hardware-based energy savings strategies, commissioning is a 'soft' process of verifying performance and design intent and correcting deficiencies. Through an evaluation of a series of field projects, this report explores the efficacy of an emerging refinement of this practice, known as monitoring-based commissioning (MBCx). MBCx can also be thought of as monitoring-enhanced building operation that incorporates three components: (1) Permanent energy information systems (EIS) and diagnostic tools at the whole-building and sub-system level; (2) Retro-commissioning based on the information from these tools and savings accounting emphasizing measurement as opposed to estimation or assumptions; and (3) On-going commissioning to ensure efficient building operations and measurement-based savings accounting. MBCx is thus a measurement-based paradigm which affords improved risk-management by identifying problems and opportunities that are missed with periodic commissioning. The analysis presented in this report is based on in-depth benchmarking of a portfolio of MBCx energy savings for 24 buildings located throughout the University of California and California State University systems. In the course of the analysis, we developed a quality-control/quality-assurance process for gathering and evaluating raw data from project sites and then selected a number of metrics to use for project benchmarking and evaluation, including appropriate normalizations for weather and climate, accounting for variations in central plant performance, and consideration of differences in building types. We performed a cost-benefit analysis of the resulting dataset, and provided comparisons to projects from a larger commissioning 'Meta-analysis' database. A total of 1120 deficiency-intervention combinations were identified in the course of commissioning the projects described in this report. The most common location of deficiencies was in HVAC equipment (65% of sites), followed by air-handling and distributions systems (59%), cooling plant (29%), heating plants (24%), and terminal units (24%). The most common interventions were adjusting setpoints, modifying sequences of operations, calibration, and various mechanical fixes (each done in about two-thirds of the sites). The normalized rate of occurrence of deficiencies and corresponding interventions ranged from about 0.1/100ksf to 10/100ksf, depending on the issue. From these interventions flowed significant and highly cost-effective energy savings For the MBCx cohort, source energy savings of 22 kBTU/sf-year (10%) were achieved, with a range of 2% to 25%. Median electricity savings were 1.9 kWh/sf-year (9%), with a range of 1% to 17%. Peak electrical demand savings were 0.2 W/sf-year (4%), with a range of 3% to 11%. The aggregate commissioning cost for the 24 projects was $2.9 million. We observed a range of normalized costs from $0.37 to 1.62/sf, with a median value of $1.00/sf for buildings that implemented MBCx projects. Per the program design, monitoring costs as a percentage of total costs are significantly higher in MBCx projects (median value 40%) than typical commissioning projects included in the Meta-analysis (median value of 2% in the commissioning database). Half of the projects were in buildings containing complex and energy-intensive laboratory space, with higher associated costs. Median energy cost savings were $0.25/sf-year, for a median simple payback time of 2.5 years. Significant and cost-effective energy savings were thus obtained. The greatest absolute energy savings and shortest payback times were achieved in laboratory-type facilities. While impacts varied from project to project, on a portfolio basis we find MBCx to be a highly cost-effective means of obtaining significant program-level energy savings across a variety of building types. Energy savings are ex

Mills, Evan; Mathew, Paul

2009-04-01T23:59:59.000Z

114

The process of life-cycle cost analysis on the Fernald Environmental Management Project  

SciTech Connect (OSTI)

The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy`s (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission.

Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

1993-10-07T23:59:59.000Z

115

SPAIN PROGRAM Madrid Four Week /  

E-Print Network [OSTI]

SPAIN PROGRAM Madrid Four Week / Madrid and Málaga Six Week 2014 Summer Program APPLICATION FORM face to scapobia@binghamton.edu. It will be used to make a photo ID card for you to use in Spain. 7 and the full refund and cancellation policy on the Spain program website pages. 8. Submit all materials to the

Suzuki, Masatsugu

116

UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1  

SciTech Connect (OSTI)

Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344.

NONE

1995-09-01T23:59:59.000Z

117

Hawaii Energy Strategy Project 2: Fossil Energy Review. Task IV. Scenario development and analysis  

SciTech Connect (OSTI)

The Hawaii Energy Strategy (HES) Program is a seven-project effort led by the State of Hawaii Department of Business, Economic Development & Tourism (DBEDT) to investigate a wide spectrum of Hawaii energy issues. The East-West Center`s Program on Resources: Energy and Minerals, has been assigned HES Project 2, Fossil Energy Review, which focuses on fossil energy use in Hawaii and the greater regional and global markets. HES Project 2 has four parts: Task I (World and Regional Fossil Energy Dynamics) covers petroleum, natural gas, and coal in global and regional contexts, along with a discussion of energy and the environment. Task II (Fossil Energy in Hawaii) focuses more closely on fossil energy use in Hawaii: current utilization and trends, the structure of imports, possible future sources of supply, fuel substitutability, and energy security. Task III`s emphasis is Greenfield Options; that is, fossil energy sources not yet used in Hawaii. This task is divided into two sections: first, an in-depth {open_quotes}Assessment of Coal Technology Options and Implications for the State of Hawaii,{close_quotes} along with a spreadsheet analysis model, which was subcontracted to the Environmental Assessment and Information Sciences Division of Argonne National Laboratory; and second, a chapter on liquefied natural gas (LNG) in the Asia-Pacific market and the issues surrounding possible introduction of LNG into the Hawaii market.

Yamaguchi, N.D.; Breazeale, K. [ed.

1993-12-01T23:59:59.000Z

118

Cost Analysis of an HIV/AIDS Prevention Project: A Case Study of the AIDS 3 Project in BENIN.  

E-Print Network [OSTI]

??HIV/AIDS Cost analysis The objective of this thesis is to undertake a cost analysis of an HIV/AIDS prevention programme targeting vulnerable groups in Benin. The (more)

Mito-Yobo, Kodjo Ferdinand

2011-01-01T23:59:59.000Z

119

Review and analysis of proposed EPA groundwater standards for the UMTRA Project. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all sites. On September 24, 1987, the EPA published proposed standards in response to the remand. This Summary Report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project as well as a discussion of the DOE's position on the proposed standards. This report is accompanied by a detailed Technical Report and Appendices which provide supporting information and analyses. This Summary Report results from a study undertaken to: determine the impact of the proposed standards on the UMTRA Project; and recommend provisions for the implementation of the final standards that will minimize adverse impact to the conduct of the UMTRA Project while ensuring protection of human health and the environment. Specifically, the following were considered: the flexibility of the proposed standards; interpretations of the proposed standards; the extent of aquifer restoration that may be required to implement the proposed standards at each site; the costs of aquifer restoration; and design changes necessary to meet the standards.

Not Available

1987-10-01T23:59:59.000Z

120

Performance Refactoring of Instrumentation, Measurement, and Analysis Technologies for Petascale Computing: the PRIMA Project  

SciTech Connect (OSTI)

The growing number of cores provided by todays high-end computing systems present substantial challenges to application developers in their pursuit of parallel efficiency. To find the most effective optimization strategy, application developers need insight into the runtime behavior of their code. The University of Oregon (UO) and the Juelich Supercomputing Centre of Forschungszentrum Juelich (FZJ) develop the performance analysis tools TAU and Scalasca, respectively, which allow high-performance computing (HPC) users to collect and analyze relevant performance data even at very large scales. TAU and Scalasca are considered among the most advanced parallel performance systems available, and are used extensively across HPC centers in the U.S., Germany, and around the world. The TAU and Scalasca groups share a heritage of parallel performance tool research and partnership throughout the past fifteen years. Indeed, the close interactions of the two groups resulted in a cross-fertilization of tool ideas and technologies that pushed TAU and Scalasca to what they are today. It also produced two performance systems with an increasing degree of functional overlap. While each tool has its specific analysis focus, the tools were implementing measurement infrastructures that were substantially similar. Because each tool provides complementary performance analysis, sharing of measurement results is valuable to provide the user with more facets to understand performance behavior. However, each measurement system was producing performance data in different formats, requiring data interoperability tools to be created. A common measurement and instrumentation system was needed to more closely integrate TAU and Scalasca and to avoid the duplication of development and maintenance effort. The PRIMA (Performance Refactoring of Instrumentation, Measurement, and Analysis) project was proposed over three years ago as a joint international effort between UO and FZJ to accomplish these objectives: (1) refactor TAU and Scalasca performance system components for core code sharing and (2) integrate TAU and Scalasca functionality through data interfaces, formats, and utilities. As presented in this report, the project has completed these goals. In addition to shared technical advances, the groups have worked to engage with users through application performance engineering and tools training. In this regard, the project benefits from the close interactions the teams have with national laboratories in the United States and Germany. We have also sought to enhance our interactions through joint tutorials and outreach. UO has become a member of the Virtual Institute of High-Productivity Supercomputing (VI-HPS) established by the Helmholtz Association of German Research Centres as a center of excellence, focusing on HPC tools for diagnosing programming errors and optimizing performance. UO and FZJ have conducted several VI-HPS training activities together within the past three years.

Malony, Allen D. [Department of Computer and Information Science, University of Oregon] [Department of Computer and Information Science, University of Oregon; Wolf, Felix G. [Juelich Supercomputing Centre, Forschungszentrum Juelich] [Juelich Supercomputing Centre, Forschungszentrum Juelich

2014-01-31T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Macroalgae Analysis A National GIS-based Analysis of Macroalgae Production Potential Summary Report and Project Plan  

SciTech Connect (OSTI)

The overall project objective is to conduct a strategic analysis to assess the state of macroalgae as a feedstock for biofuels production. The objective in FY11 is to develop a multi-year systematic national assessment to evaluate the U.S. potential for macroalgae production using a GIS-based assessment tool and biophysical growth model developed as part of these activities. The initial model development for both resource assessment and constraints was completed and applied to the demonstration areas. The model for macroalgal growth was extended to the EEZ off the East and West Coasts of the United States, and a plan to merge the findings for an initial composite assessment was developed. In parallel, an assessment of land-based, port, and offshore infrastructure needs based on published and grey literature was conducted. Major information gaps and challenges encountered during this analysis were identified. Also conducted was an analysis of the type of local, state, and federal requirements that pertain to permitting land-based facilities and nearshore/offshore culture operations

Roesijadi, Guritno; Coleman, Andre M.; Judd, Chaeli; Van Cleve, Frances B.; Thom, Ronald M.; Buenau, Kate E.; Tagestad, Jerry D.; Wigmosta, Mark S.; Ward, Jeffrey A.

2011-12-01T23:59:59.000Z

122

Pacific Northwest Region MAPS dataset retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management  

E-Print Network [OSTI]

Pacific Northwest Region MAPS dataset ­ retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management and Climate Change Support Tools for Landbird) demographic dataset may reveal how predicted patterns of climate-related forest fragmentation, pest outbreak

DeSante, David F.

123

Life Cycle Analysis for the Walter H. Gage Residence The life cycle analysis (LCA) being carried out for this project is one of thirteen  

E-Print Network [OSTI]

The life cycle analysis (LCA) being carried out for this project is one of thirteen others that are being1 Life Cycle Analysis for the Walter H. Gage Residence Civl 498c Jack Liu #12;Liu 2 Abstract by the UBC Records Department to perform takeoffs for the EIE inputs. The EIE presented the impact assessment

124

Reduced order models for thermal analysis : final report : LDRD Project No. 137807.  

SciTech Connect (OSTI)

This LDRD Senior's Council Project is focused on the development, implementation and evaluation of Reduced Order Models (ROM) for application in the thermal analysis of complex engineering problems. Two basic approaches to developing a ROM for combined thermal conduction and enclosure radiation problems are considered. As a prerequisite to a ROM a fully coupled solution method for conduction/radiation models is required; a parallel implementation is explored for this class of problems. High-fidelity models of large, complex systems are now used routinely to verify design and performance. However, there are applications where the high-fidelity model is too large to be used repetitively in a design mode. One such application is the design of a control system that oversees the functioning of the complex, high-fidelity model. Examples include control systems for manufacturing processes such as brazing and annealing furnaces as well as control systems for the thermal management of optical systems. A reduced order model (ROM) seeks to reduce the number of degrees of freedom needed to represent the overall behavior of the large system without a significant loss in accuracy. The reduction in the number of degrees of freedom of the ROM leads to immediate increases in computational efficiency and allows many design parameters and perturbations to be quickly and effectively evaluated. Reduced order models are routinely used in solid mechanics where techniques such as modal analysis have reached a high state of refinement. Similar techniques have recently been applied in standard thermal conduction problems e.g. though the general use of ROM for heat transfer is not yet widespread. One major difficulty with the development of ROM for general thermal analysis is the need to include the very nonlinear effects of enclosure radiation in many applications. Many ROM methods have considered only linear or mildly nonlinear problems. In the present study a reduced order model is considered for application to the combined problem of thermal conduction and enclosure radiation. The main objective is to develop a procedure that can be implemented in an existing thermal analysis code. The main analysis objective is to allow thermal controller software to be used in the design of a control system for a large optical system that resides with a complex radiation dominated enclosure. In the remainder of this section a brief outline of ROM methods is provided. The following chapter describes the fully coupled conduction/radiation method that is required prior to considering a ROM approach. Considerable effort was expended to implement and test the combined solution method; the ROM project ended shortly after the completion of this milestone and thus the ROM results are incomplete. The report concludes with some observations and recommendations.

Hogan, Roy E., Jr.; Gartling, David K.

2010-09-01T23:59:59.000Z

125

Open Access Week Planning Materials  

E-Print Network [OSTI]

TAMUemployees list TAMUemployees list KAMU-TV Magazine TAMU Landing-page for Open Access Week library.tamu.edu/oaweek Open Access Week (organized by SPARC) www.openaccessweek.org Digital Repository Disseminate your work... via the Texas A&M University Digital Repository and get ? ?more exposure universal access easier information discovery persistent access wide range of content? SPARC http://www.arl.org/sparc...

126

Fuel Cycle Analysis Framework Base Cases for the IAEA/INPRO GAINS Collaborative Project  

SciTech Connect (OSTI)

Thirteen countries participated in the Collaborative Project GAINS Global Architecture of Innovative Nuclear Energy Systems Based on Thermal and Fast Reactors Including a Closed Fuel Cycle, which was the primary activity within the IAEA/INPRO Program Area B: Global Vision on Sustainable Nuclear Energy for the last three years. The overall objective of GAINS was to develop a standard framework for assessing future nuclear energy systems taking into account sustainable development, and to validate results through sample analyses. This paper details the eight scenarios that constitute the GAINS framework base cases for analysis of the transition to future innovative nuclear energy systems. The framework base cases provide a reference for users of the framework to start from in developing and assessing their own alternate systems. Each base case is described along with performance results against the GAINS sustainability evaluation metrics. The eight cases include four using a moderate growth projection and four using a high growth projection for global nuclear electricity generation through 2100. The cases are divided into two sets, addressing homogeneous and heterogeneous scenarios developed by GAINS to model global fuel cycle strategies. The heterogeneous world scenario considers three separate nuclear groups based on their fuel cycle strategies, with non-synergistic and synergistic cases. The framework base case analyses results show the impact of these different fuel cycle strategies while providing references for future users of the GAINS framework. A large number of scenario alterations are possible and can be used to assess different strategies, different technologies, and different assumptions about possible futures of nuclear power. Results can be compared to the framework base cases to assess where these alternate cases perform differently versus the sustainability indicators.

Brent Dixon

2012-09-01T23:59:59.000Z

127

Supplement to the UMTRA project water sampling and analysis plan, Slick Rock, Colorado  

SciTech Connect (OSTI)

The water sampling and analysis plan (WSAP) provides the regulatory and technical basis for ground water and surface water sampling at the Uranium Mill Tailings Remedial Action (UMTRA) Project Union Carbide (UC) and North Continent (NC) processing sites and the Burro Canyon disposal site near Slick Rock, Colorado. The initial WSAP was finalized in August 1994 and will be completely revised in accordance with the WSAP guidance document (DOE, 1995) in late 1996. This version supplements the initial WSAP, reflects only minor changes in sampling that occurred in 1995, covers sampling scheduled for early 1996, and provides a preliminary projection of the next 5 years of sampling and monitoring activities. Once surface remedial action is completed at the former processing sites, additional and more detailed hydrogeologic characterization may be needed to develop the Ground Water Program conceptual ground water model and proposed compliance strategy. In addition, background ground water quality needs to be clearly defined to ensure that the baseline risk assessment accurately estimated risks from the contaminants of potential concern in contaminated ground water at the UC and NC sites.

NONE

1995-09-01T23:59:59.000Z

128

Supplement to the UMTRA Project water sampling and analysis plan, Maybell, Colorado  

SciTech Connect (OSTI)

This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Maybell, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Maybell (DOE, 1994a). Further, this supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Maybell. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1994) and 60 CFR 2854 (1 995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Maybell site are the Maybell Baseline Risk Assessment (currently in progress), the Maybell Remedial Action Plan (RAP) (DOE, 1994b), and the Maybell Environmental Assessment (DOE, 1995).

NONE

1995-09-01T23:59:59.000Z

129

Supplement to the UMTRA Project water sampling and analysis plan, Mexican Hat, Utah  

SciTech Connect (OSTI)

This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Mexican Hat, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Mexican Hat (DOE, 1994). Further, the supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Mexican Hat. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1991) and 60 FR 2854 (1995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Mexican Hat site are the Mexican Hat Long-Term Surveillance Plan (currently in progress), and the Mexican Hat Site Observational Work Plan (currently in progress).

NONE

1995-09-01T23:59:59.000Z

130

Analog Readout and Analysis Software for the Ultra-High Rate Germanium (UHRGe) Project  

SciTech Connect (OSTI)

High-resolution high-purity germanium (HPGe) spectrometers are needed for Safeguards applications such as spent fuel assay and uranium hexafluoride cylinder verification. In addition, these spectrometers would be applicable to other high-rate applications such as non-destructive assay of nuclear materials using nuclear resonance fluorescence. Count-rate limitations of today's HPGe technologies, however, lead to concessions in their use and reduction in their efficacy. Large-volume, very high-rate HPGe spectrometers are needed to enable a new generation of nondestructive assay systems. The Ultra-High Rate Germanium (UHRGe) project is developing HPGe spectrometer systems capable of operating at unprecedented rates, 10 to 100 times those available today. This report documents current status of developments in the analog electronics and analysis software.

Fast, James E.; Aguayo Navarrete, Estanislao; Evans, Allan T.; VanDevender, Brent A.; Rodriguez, Douglas C.; Wood, Lynn S.

2011-09-01T23:59:59.000Z

131

AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis  

SciTech Connect (OSTI)

This report contributes initial findings from an analysis of significant aspects of the gridSMART Real-Time Pricing (RTP) Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

2014-02-01T23:59:59.000Z

132

Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop  

SciTech Connect (OSTI)

In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project teams work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASCs Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

Galarowicz, James

2014-01-06T23:59:59.000Z

133

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

in the industry familiar with the situation believe these incidents are the result of soil shifting brought on by the record rain and snow in the region over the last 18...

134

weekly  

Gasoline and Diesel Fuel Update (EIA)

4, 1997 http:www.eia.doe.gov N Y M E X F u t u r e P r i c e s v s H e n r y H u b S p o t P r i c e s 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 ....

135

weekly  

Gasoline and Diesel Fuel Update (EIA)

, 1997 http:www.eia.doe.gov N Y M E X F u t u r e P r i c e s v s H e n r y H u b S p o t P r i c e s 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 ....

136

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

6, 1997 http:www.eia.doe.gov N Y M E X P r i c e F u t u r e s v s H e n r y H u b S p o t P r i c e 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 . 7...

137

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

30,1996 http:www.eia.doe.gov N Y M E X P r i c e F u t u r e s v s H e n r y H u b S p o t P r i c e 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 . 7...

138

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

0, 1997 http:www.eia.doe.gov N Y M E X F u t u r e P r i c e s v s H e n r y H u b S p o t P r i c e s 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 ....

139

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

1, 1997 http:www.eia.doe.gov N Y M E X F u t u r e P r i c e s v s H e n r y H u b S p o t P r i c e s 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 ....

140

weekly  

Gasoline and Diesel Fuel Update (EIA)

7, 1997 http:www.eia.doe.gov N Y M E X P r i c e F u t u r e s v s H e n r y H u b S p o t P r i c e 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 . 7...

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

weekly  

Gasoline and Diesel Fuel Update (EIA)

6,1996 http:www.eia.doe.gov N Y M E X P r i c e F u t u r e s v s H e n r y H u b S p o t P r i c e 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 . 7...

142

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

3, 1997 http:www.eia.doe.gov N Y M E X F u t u r e P r i c e s v s H e n r y H u b S p o t P r i c e s 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 ....

143

Weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

7, 1997 http:www.eia.doe.gov N Y M E X F u t u r e P r i c e s v s H e n r y H u b S p o t P r i c e s 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 Dollars Per Million...

144

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

7, 1997 http:www.eia.doe.gov N Y M E X F u t u r e P r i c e s v s H e n r y H u b S p o t P r i c e s 1 . 5 0 1 . 7 5 2 . 0 0 2 . 2 5 2 . 5 0 2 . 7 5 3 . 0 0 3 . 2 5 3 . 5 0 3 ....

145

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

of December this year is 4 percent or 89 Bcf less than at the same time last year. The level of working gas in the critical East Consuming region&20;s storage facilities was...

146

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

storage sites located in the East Consuming region; last year it was 245. The estimated level of working gas in eastern storage facilities at the end of February was more than 50...

147

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

demand for gas have allowed the industry&20;s storage facilities to sustain a much improved level compared to last year. This improved confidence in storage resources has removed...

148

weekly  

U.S. Energy Information Administration (EIA) Indexed Site

than normal. This was especially true in the upper Midwest where temperatures did not rise above single digits for several consecutive days in many areas including Chicago,...

149

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,1996 N Y M

150

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,1996 N Y

151

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,1996 N

152

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,1996 N6, 1997

153

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,1996 N6,

154

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,1996 N6,1,

155

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,1996 N6,1,7,

156

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,1996

157

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,19960, 1997

158

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,19960, 19978,

159

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,19960,

160

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,19960,, 1997

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,19960,,

162

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,19960,,7,

163

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,19960,,7,4,

164

weekly  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N Y3,19960,,7,4,1,

165

Weekly  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S. NaturalA. Michael SchaalNovember1. Foreign sales ofLiquidsWater0, 1997

166

Weekly  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S. NaturalA. Michael SchaalNovember1. Foreign sales ofLiquidsWater0, 19977, 1997

167

Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program  

SciTech Connect (OSTI)

This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

Steinberg, D.; Porro, G.; Goldberg, M.

2012-04-01T23:59:59.000Z

168

Vehicle Technologies' Fact of the Week 2011  

SciTech Connect (OSTI)

Each week the U.S. Department of Energy s Vehicle Technology Program (VTP) posts a Fact of the Week on their website: http://www1.eere.energy.gov/vehiclesandfuels/. These Facts provide statistical information, usually in the form of charts and tables, on vehicle sales, fuel economy, gasoline prices, and other transportation-related trends. Each Fact is a stand-alone page that includes a graph, text explaining the significance of the data, the supporting information on which the graph was based, and the source of the data. A link to the current Fact is available Monday through Friday on the VTP homepage, but older Facts are archived and still available at: http://www1.eere.energy.gov/vehiclesandfuels/facts/. This report is a compilation of the Facts that were posted during calendar year 2011. The Facts were written and prepared by staff in Oak Ridge National Laboratory's Center for Transportation Analysis.

Davis, Stacy Cagle [ORNL; Diegel, Susan W [ORNL; Boundy, Robert Gary [ORNL

2012-04-01T23:59:59.000Z

169

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

170

America Saves Week | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuelsPropaneSecurityhere! America Saves Week is aWeek

171

A Comparative Analysis of Predicting Energy Savings from Energy Service Projects  

E-Print Network [OSTI]

Implementation of energy service projects continue to increase as building owners are faced with higher utility bills, rigorous environmental regulations, and shrinking capital allocation for such projects. Different techniques and guidelines...

Kim, Amy A

2014-05-01T23:59:59.000Z

172

Pumped Storage Hydropower (Project Development Support)Geotechnical Investigation and Value Stream Analysis for the Iowa Hill Pumped-Storage Development  

Broader source: Energy.gov [DOE]

Pumped Storage Hydropower (Project Development Support)Geotechnical Investigation and Value Stream Analysis for the Iowa Hill Pumped-Storage Development

173

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects  

SciTech Connect (OSTI)

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects

Spane, Frank A.

2013-04-29T23:59:59.000Z

174

Sensitivity Analysis of Factors Effecting the Financial Viability of Cogeneration Projects  

E-Print Network [OSTI]

demand and an energy charge? Is the price based on PURPA? What is the projected rate of increase in the price of electricity? Does the term of the electric contract extend throughout the period of repayment of the financing? o Projected operating... costs reasonable? Is there a fixed price contract for the construction of the project? What party is responsible for paying construction over-runs? o Permits Have all required permits and licenses necessary to construct and operate the Project...

Clunie, J. F.

1984-01-01T23:59:59.000Z

175

AUGUST 15, 2012 This Week...  

E-Print Network [OSTI]

AUGUST 15, 2012 This Week... Crime Rates Employment Food Prices Retail Sales Crime Rates By Doug.5% in Alberta. The lower infla on rates this year are mainly because gasoline prices have stopped increasing Prices In the first half of 2012, the rate of infla on in the West has been lower than in 2011 and

Peak, Derek

176

Start Date: Hours per Week  

E-Print Network [OSTI]

Wednesday Thursday Friday Saturday Sunday Storming Robots Technology Learning Institution 3322 Rt. 22 West, Suite 402 Branchburg NJ 08876 Elizabeth Mabrey emabrey@stormingrobots.com 908-595-1010 Robotics Instructor / Assistant $15 to $30 Any Time from 2 to 12 hours per week one 1) Instructor/Assistant

Garfunkel, Eric

177

ENERGY RECOVERY COUNCIL WEEKLY UPDATE  

E-Print Network [OSTI]

to Chairman George Miller. Prior to that, from 2002 through 2007, Jordan worked at the US Chemical Safety, recycling, health & safety, etc. Senators Amy Klobuchar (D-MN) and Olympia Snowe (R-ME) last week introduced, trash combustion facilities, qualified hydropower facilities, and marine and hydrokinetic renewable

178

OCTOBER 5, 2010 This Week...  

E-Print Network [OSTI]

OCTOBER 5, 2010 This Week... Employment grows in the west, while inflation remains low Volume I, Issue 1 By Doug Elliott, Editor Labour Market The most recent data from Statistics Canada's labour force survey show that employment is growing again in the western provinces. Overall, employment is up 1

Saskatchewan, University of

179

Assessing the influence of environmental impact assessments on science and policy: An analysis of the Three Gorges Project  

E-Print Network [OSTI]

Assessing the influence of environmental impact assessments on science and policy: An analysis Keywords: Environmental impact assessment Dams Three Gorges Project Uncertainty Prioritization a b s t r exist between the scientific interest (via number of publications) in environmental impacts and (a

Tullos, Desiree

180

Juan de la Cosas Projection: A Fresh Analysis of the Earliest Preserved Map of the Americas  

E-Print Network [OSTI]

Coordinates Series A, no. 9 Juan de la Cosa?s Projection: A Fresh Analysis of the Earliest Preserved Map of the Americas Persistent URL for citation: http://purl.oclc.org/coordinates/a9.htm Date of Publication: May 24, 2010 Luis A...

Robles Macias, Luis A.

2010-05-24T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

LED Light Fixture Project FC1 Director's Conference Room: Life Cycle Cost and Break-even Analysis  

E-Print Network [OSTI]

. A light-emitting diode (LED) is a solid-state lighting source that switches on instantly, is readilyLED Light Fixture Project ­ FC1 Director's Conference Room: Life Cycle Cost and Break-even Analysis light fixtures in existing or new buildings across campus. Scope of Work On August 27, 2012, the six

Johnston, Daniel

182

National Nuclear Science Week 2012 - SRSCRO  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Know Nuclear National Nuclear Science Week January 23 - 27, 2012 Fostering a deeper public understanding Logos for: National Nuclear Science Week, Nuclear Workforce Initiative,...

183

Critical analysis of the Hanford spent nuclear fuel project activity based cost estimate  

SciTech Connect (OSTI)

In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI`s review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI`s review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI`s scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

Warren, R.N.

1998-09-29T23:59:59.000Z

184

Analysis Of Ductile Crack Growth In Pipe Test In STYLE Project  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) is conducting structural analyses, both deterministic and probabilistic, to simulate a large scale mock-up experiment planned within the European Network for Structural Integrity for Lifetime Management non-RPV Components (STYLE). The paper summarizes current ORNL analyses of STYLE s Mock-up3 experiment to simulate/evaluate ductile crack growth in a cladded ferritic pipe. Deterministic analyses of the large-scale bending test of ferritic surge pipe, with an internal circumferential crack, are simulated with a number of local micromechanical approaches, such as Gurson-Tvergaard-Needleman (GTN) model and cohesive-zone model. Both WARP 3D and ABAQUS general purpose finite element programs are being used to predict the failure load and the failure mode, i.e. ductile tearing or net-section collapse, as part of the pre-test phase of the project. Companion probabilistic analyses of the experiment are utilizing the ORNL developed open-source Structural Integrity Assessment Modular - Probabilistic Fracture Mechanics (SIAM-PFM) framework. SIAM-PFM contains engineering assessment methodology such as the tearing instability (J-T analysis) module developed for inner surface cracks under bending load. The driving force J-integral estimations are based on the SC.ENG1 or SC.ENG2 models. The J-A2 methodology is used to transfer (constraint-adjust) J-R curve material data from standard test specimens to the Mock-up3 experiment configuration. The probabilistic results of the Mock-Up3 experiment obtained from SIAM-PFM will be compared to those generated using the deterministic finite element modeling approach. The objective of the probabilistic analysis is to provide uncertainty bounds that will assist in assessing the more detailed 3D finite-element solutions and to also assess the level of confidence that can be placed in the best-estimate finite-element solutions.

Yin, Shengjun [ORNL; Williams, Paul T [ORNL; Klasky, Hilda B [ORNL; Bass, Bennett Richard [ORNL

2012-01-01T23:59:59.000Z

185

HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT SEISMIC ANALYSIS IN SUPPORT OF INCREASED LIQUID LEVEL IN 241-AP TANK FARMS  

SciTech Connect (OSTI)

The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST System at Hanford. The "Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Project" is in support of Tri-Party Agreement Milestone M-48-14.

MACKEY TC; ABBOTT FG; CARPENTER BG; RINKER MW

2007-02-16T23:59:59.000Z

186

Large Scale Duty Cycle (LSDC) Project: Tractive Energy Analysis Methodology and Results from Long-Haul Truck Drive Cycle Evaluations  

SciTech Connect (OSTI)

This report addresses the approach that will be used in the Large Scale Duty Cycle (LSDC) project to evaluate the fuel savings potential of various truck efficiency technologies. The methods and equations used for performing the tractive energy evaluations are presented and the calculation approach is described. Several representative results for individual duty cycle segments are presented to demonstrate the approach and the significance of this analysis for the project. The report is divided into four sections, including an initial brief overview of the LSDC project and its current status. In the second section of the report, the concepts that form the basis of the analysis are presented through a discussion of basic principles pertaining to tractive energy and the role of tractive energy in relation to other losses on the vehicle. In the third section, the approach used for the analysis is formalized and the equations used in the analysis are presented. In the fourth section, results from the analysis for a set of individual duty cycle measurements are presented and different types of drive cycles are discussed relative to the fuel savings potential that specific technologies could bring if these drive cycles were representative of the use of a given vehicle or trucking application. Additionally, the calculation of vehicle mass from measured torque and speed data is presented and the accuracy of the approach is demonstrated.

LaClair, Tim J [ORNL

2011-05-01T23:59:59.000Z

187

Applications of geographic information systems (GIS) in decision analysis for monitoring aquifer systems during oilfield development projects  

SciTech Connect (OSTI)

Geographic Information Systems (GIS) coupled with numerical ground water models provide a powerful Decision Support System (DSS) and visualization tool for monitoring aquifer systems during oilfield development projects. A GIS is a coupled software/hardware system that stores, processes, and displays a variety of data structures (raster, vector, TIN, CAD) that have been geographically referenced to some common map projection and coordinate system. Georeferencing allows the analyst to integrate diverse types of data layers into thematic maps for analysis of spatial trends and analyses. The integration of quasi 3-D numerical ground water models with GIS provides project managers with a Decision Support System (DSS) to assess potential impacts to aquifer systems during oilfield development projects. The rapid advancement in desktop PC computing power and data storage has allowed software developers to produce 32-bit GIS and data integration software applications. A variety of image processing, GIS, and numerical ground water modeling software will be used to demonstrate techniques for monitoring and visualizing the migration of an oilfield brine plume leaking during an oilfield development project. Emphasis will be placed on the integration of data structures and on database design to create a DSS within a desktop GIS to serve Project Managers during oilfield development.

Blundell, S.; Baldwin, D.O.; Anderson, N.J. [Integrated Geoscience, Inc., Helena, MT (United States)

1996-06-01T23:59:59.000Z

188

A comparative analysis of business structures suitable forfarmer-owned wind power projects in the United States  

SciTech Connect (OSTI)

For years, farmers in the United States have looked with envy on their European counterparts' ability to profitably farm the wind through ownership of distributed, utility-scale wind projects. Only within the past few years, however, has farmer- or community-owned wind power development become a reality in the United States. The primary hurdle to this type of development in the United States has been devising and implementing suitable business and legal structures that enable such projects to take advantage of tax-based federal incentives for wind power. This article discusses the limitations of such incentives in supporting farmer- or community-owned wind projects, describes four ownership structures that potentially overcome such limitations, and finally conducts comparative financial analysis on those four structures, using as an example a hypothetical 1.5 MW farmer-owned project located in the state of Oregon. We find that material differences in the competitiveness of each structure do exist, but that choosing the best structure for a given project will largely depend on the conditions at hand; e.g., the ability of the farmer(s) to utilize tax credits, preference for individual versus ''cooperative'' ownership, and the state and utility service territory in which the project will be located.

Bolinger, Mark; Wiser, Ryan

2004-11-11T23:59:59.000Z

189

Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013  

SciTech Connect (OSTI)

The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

Owens, C. M.

2013-09-01T23:59:59.000Z

190

Governance in Open Source Software Development Projects: A Comparative Multi Level Analysis  

E-Print Network [OSTI]

and adaptive software systems. In this paper, we examine how practices and processes enable and govern OSS and generalization based on empirical studies of OSS projects, work practices, development processes for Understanding Governance in OSS Projects OSS work practices, engineering processes, and community dynamics can

Scacchi, Walt

191

REU 2013: SCHEDULE FOR WEEKS FIVE AND SIX PRELIMINARY VERSION  

E-Print Network [OSTI]

and other topics. FIFTH WEEK: Date Apprentice Analysis Number theory Alg, Top, Etc Babai/Tulsiani Ciomaga Tulsiani. Apprentice. 9:30­12:00 M-F Adina Ciomaga, Jessica Lin. Analysis. 1:30­3:00 MWF Emerton

May, J. Peter

192

Phase 1 Characterization sampling and analysis plan West Valley demonstration project.  

SciTech Connect (OSTI)

The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

Johnson, R. L. (Environmental Science Division)

2011-06-30T23:59:59.000Z

193

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"Click worksheet9,1,50022,3,,,,6,1,,781Title: Telephone:short version) Themonthly4BlenderWeekly Petroleum

194

Weekly Natural Gas Storage Report  

Weekly Natural Gas Storage Report (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005 (Thousand Barrels, Except Where Noted)December 2005d .B.1. Weekly

195

A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States  

E-Print Network [OSTI]

Wisconsin Community Based Windpower Project Business Plan.Wisconsin Community Based Windpower Project Business Plan

Bolinger, Mark; Wiser, Ryan

2004-01-01T23:59:59.000Z

196

HANFORD DST THERMAL & SEISMIC PROJECT DYTRAN ANALYSIS OF SEISMICALLY INDUCED FLUID STRUCTURE INTERACTION IN A HANFORD DOUBLE SHELL PRIMARY TANK  

SciTech Connect (OSTI)

Revision 0A of this document contains new Appendices C and D. Appendix C contains a re-analysis of the rigid and flexible tanks at the 460 in. liquid level and was motivated by recommendations from a Project Review held on March 20-21, 2006 (Rinker et al Appendix E of RPP-RPT-28968 Rev 1). Appendix D contains the benchmark solutions in support of the analyses in Appendix C.

MACKEY TC; RINKER MW; ABATT FG

2007-02-14T23:59:59.000Z

197

A Framework for Risk Analysis for Ecological Restoration Projects in the U.S. Army Corps of Engineers  

SciTech Connect (OSTI)

This report provides a framework for incorporating risk analysis into the six-step planning process for ecosystem restoration projects. This report is part of a larger research and development effort to develop procedures and guidelines for risk analysis in USACE ecosystem restoration planning. The focus is on risk analysis: identifying the range of possible outcomes from alternative ecosystem restoration actions, assessing the potential for achieving the desired outcome, characterizing the likelihood of adverse consequences, and communicating these findings to stakeholders and decision makers. This framework document makes simplifying assumptions to allow a focus on incorporating risk information in the planning and decision-making process. A conceptual model of the site and landscape is advocated as a central organizing structure within the six-step process for ecosystem restoration project planning. This is responsive to USACE directives that restoration projects be conceived in a systems context using an ecosystem and/or watershed approach. The conceptual model delineates the empirical quantities to be addressed in risk analysis and modeling. Although the planning process is described in six distinct steps, in practice these steps are iterative and often carried out simultaneously. Risk analysis within this context has the same character. The approach for incorporating risk analysis into the planning process provides direction intended to help the planner: Identify the levels of uncertainty that are acceptable, at the start of the planning process. Use conceptual and numerical models to communicate the planning teams understanding of the ecosystem to others, and reduce the risk of mis-specifying the system. Consider the uncertainty associated with the variables chosen to measure project effects. Use alternative designs to manage identified uncertainty. Use risk information to eliminate alternatives with unacceptable risk from consideration. Incorporate risk analysis into the USACE four criteria of effectiveness, efficiency, completeness, and acceptability. Use an alternatives irreducible uncertainty as an attribute to be considered along with other attributes in the comparison of alternative plans. Use risk information in the final plan selection process. There are three other efforts associated with this framework document, which offer information and guidance for incorporating risk analysis into cost-estimation, and biological and hydrologic modeling.

Diefenderfer, Heida L.; Thom, Ronald M.; Hofseth, Keith

2005-01-03T23:59:59.000Z

198

Flexibility in Design, Outcomes and Analysis in Evidence- Based Drug Prevention Research: The Case of the Midwestern Prevention Project  

E-Print Network [OSTI]

, column 2]. h Dwyer et al. [20] used a number of different models in their analysis and concluded that these showed no evidence of an effect on alcohol use [20, p. 781]. Hence ? appears in the table. i Data for the 1-year follow-up are from Pentz et...Citation: Gorman DM. Flexibility in Design, Outcomes and Analysis in Evidence-Based Drug Prevention Research: The Case of the Midwestern Prevention Project. J Addiction Prevention. 2013;1(3): 8. J Addiction Prevention November 2013 Vol.:1, Issue...

Gorman, Dennis M.

2013-11-22T23:59:59.000Z

199

Valuation of wind energy projects and statistical analysis of wind power  

E-Print Network [OSTI]

As energy becomes an increasingly important issue for generations to come, it is crucial to develop tools for valuing and understanding energy projects from an economic perspective since ultimately only economically viable ...

Nanopoulos, Andrew

2012-01-01T23:59:59.000Z

200

Risk analysis in oil and gas projects : a case study in the Middle East  

E-Print Network [OSTI]

Global demand for energy is rising around the world. Middle East is a major supplier of oil and gas and remains an important region for any future oil and gas developments. Meanwhile, managing oil and gas projects are ...

Zand, Emad Dolatshahi

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Improving supply chain performance by implementing weekly demand planning processes in the consumer packaged goods industry  

E-Print Network [OSTI]

This thesis examines how simple weekly demand planning process can improve inventory levels and customers service levels at the Gillette Company. The processes designed by the project team has been tested and executed in ...

Rah, Myung-Hyun Elisa

2006-01-01T23:59:59.000Z

202

PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States  

SciTech Connect (OSTI)

Renewable power technologies are inherently capital-intensive, often (but not always) with relatively high construction costs and low operating costs. For this reason, renewable power technologies are typically more sensitive to the availability and cost of financing than are natural gas power plants, for example. In the United States, the bulk of renewable project finance in recent years has been provided by 'tax equity investors' (typically large investment banks and insurance companies) who partner with project developers through highly specialized financing structures (Bolinger, 2009; Cory et al., 2008; Harper et al., 2007). These structures have been designed primarily to capitalize on federal support for renewable power technologies, which has historically come in the form of tax credits and accelerated depreciation deductions. The number of tax equity investors active in the renewable power market has declined precipitously, however, as a result of the financial crisis that began unfolding across the globe in the summer of 2008. The resulting shortage and increased cost of project financing has, in turn, slowed the development of new renewable power projects, leading to layoffs throughout the entire industry supply chain. In recognition of the fact that tax-based policy incentives are not particularly effective when tax burdens are shrinking or non-existent, Congress included several provisions in 'The American Recovery and Reinvestment Act of 2009' (ARRA 2009) designed to make federal incentives for renewable power technologies more useful. Among these provisions is one that allows projects eligible to receive the production tax credit ('the PTC', see Text Box 1) to instead elect the investment tax credit ('the ITC', see Text Box 2). Another provision enables ITC-eligible projects (which now include most PTC-eligible renewable power projects) to instead receive--for a limited time only--a cash grant of equivalent value. These two provisions (among others) could have a significant impact on how renewable power projects are financed over the next few years. The purpose of this report is to both quantitatively and qualitatively analyze, from the project developer/owner perspective, the choice between the PTC and the ITC (or equivalent cash grant) for a number of different renewable power technologies.1 Because the two credits are structured differently, and apply in different ways to different technologies, the choice between the two lends itself to quantitative financial analysis of the conditions under which either the PTC or the ITC would, at least in theory, provide greater financial value. Qualitative considerations may be equally important, however, particularly in instances where quantitative differences are modest. This report proceeds as follows. Section 2 provides a brief summary of ARRA 2009, with some emphasis on those provisions designed to ease the liquidity crisis facing the renewable power sector. Section 3 describes the quantitative analysis methodology, as well as modeling results for wind, open-loop biomass, closed-loop biomass, geothermal, and landfill gas projects. Section 4 discusses a number of qualitative considerations that may play as important of a role as quantitative results in deciding between the PTC and the ITC (or equivalent cash grant). Section 5 concludes, and an Appendix provides supplemental tables that present quantitative analysis results conducted at different discount rates.

Bolinger, Mark; Wiser, Ryan; Cory, Karlynn; James, Ted

2009-03-11T23:59:59.000Z

203

Subsidence at the Weeks Island SPR Facility  

SciTech Connect (OSTI)

The elevation change data measured at the Weeks Island SPR site over the last 16+ years has been studied and analyzed. The subsidence rate is not constant with time and while the subsidence rate may have increased slightly during the past several years, recently the rate has increased more dramatically. The most recent increase comes at a time when the Strategic Petroleum Reserve (SPR) storage mine had been emptied of oil and was in the process of being refilled with brine. Damage to surface structures that has been observed during the past 12-18 months is attributed to the continued subsidence and dtierential subsidence across structures. The recent greater subsidence rates were unanticipated according to analysis results and will be used to aid further subsidence model development.

Bauer, S.J.

1999-01-01T23:59:59.000Z

204

ATLAS Upgrade Week 1 November 11, 2009  

E-Print Network [OSTI]

ATLAS Upgrade Week 1 November 11, 2009 Proposal to Develop On-Detector Array-based Optical Link A. Maettig Universität Wuppertal K.K. Gan A. Pellegrino, T. Sluijk NIKHEF (LHCb) #12;ATLAS Upgrade Week 2;ATLAS Upgrade Week 3 Introduction VCSEL and PIN are available in three forms: single channel or 4

Gan, K. K.

205

E-Print Network 3.0 - analysis scepa project Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fragmentationandimmiserisingspecialisation Summary: . An empirical analysis using panel data reveals that, contrary to expectation, the textile and clothing sector......

206

ORNL/CDIAC-145 GLOBAL OCEAN DATA ANALYSIS PROJECT (GLODAP): RESULTS AND DATA  

E-Print Network [OSTI]

.S.A. 3 Carbon Dioxide Information Analysis Center, Oak Ridge National Laboratory, DOE, Oak Ridge, TN, U Dioxide Information Analysis Center Oak Ridge National Laboratory Oak Ridge, Tennessee, U.S.A. Date Prepared by the Carbon Dioxide Information Analysis Center OAK RIDGE NATIONAL LABORATORY Oak Ridge

207

Review and analysis of proposed EPA groundwater standards for the UMTRA Project. Summary report  

SciTech Connect (OSTI)

The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all sites. On September 24, 1987, the EPA published proposed standards in response to the remand. This Summary Report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project as well as a discussion of the DOE`s position on the proposed standards. This report is accompanied by a detailed Technical Report and Appendices which provide supporting information and analyses. This Summary Report results from a study undertaken to: determine the impact of the proposed standards on the UMTRA Project; and recommend provisions for the implementation of the final standards that will minimize adverse impact to the conduct of the UMTRA Project while ensuring protection of human health and the environment. Specifically, the following were considered: the flexibility of the proposed standards; interpretations of the proposed standards; the extent of aquifer restoration that may be required to implement the proposed standards at each site; the costs of aquifer restoration; and design changes necessary to meet the standards.

Not Available

1987-10-01T23:59:59.000Z

208

Project Cost Escalation Standards, document IEAB 2007-2 Page 1 Independent Economic Analysis Board  

E-Print Network [OSTI]

and contracting. Inflation and Cost Escalation Principles Inflation refers to an increase in price levels over in the report and guidance is provided for using cost escalators and price indices to improve cost predictions time. Prices paid by fish and wildlife projects for inputs such as labor and materials often increase

209

TECHNICAL EVALUATIONS AND ANALYSIS OF CURRENTLY FUNDED PROJECTS AND DATABASE DEVELOPMENT  

E-Print Network [OSTI]

of providing to the Hydrogen Annual Peer Review Panels the type of in-depth, impartial, independent information that cannot be obtained in a 20-30 minute presentation at the Annual Peer Review. Once a project is chosen two or three years of Annual Operating Plan submittals, monthly reports, the Annual Review paper

210

Survey and analysis of selected jointly owned large-scale electric utility storage projects  

SciTech Connect (OSTI)

The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

Not Available

1982-05-01T23:59:59.000Z

211

An analysis of accident experience at entrance ramps within construction work zones at long-term freeway reconstruction projects in Texas  

E-Print Network [OSTI]

AN ANALYSIS OF ACCIDENT EXPERIENCE AT ENTRANCE RAMPS WITHIN CONSTRUCTION WORK ZONES AT LONG-TERM FREEWAY RECONSTRUCTION PROJECTS IN TEXAS A Thesis by DAVID BRYAN CASTEEL Submitted to the Office of Graduate Studies of Texas A&M University... in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE August 1991 Major Subject: Civil Engineering AN ANALYSIS OF ACCIDENT EXPERIENCE AT ENTRANCE RAMPS WITHIN CONSTRUCTION WORK ZONES AT LONG-TERM FREEWAY RECONSTRUCTION PROJECTS...

Casteel, David Bryan

1991-01-01T23:59:59.000Z

212

Description and analysis of the shrimp raceway run for the summer 1990, Shrimp Mariculture Project, Texas A&M University System  

E-Print Network [OSTI]

DESCRIPTION AND ANALYSIS OF THE SHRIMP RACEWAY RUN FOR THE SUMMER 1990, SHRIMP MARICULTURE PROJECT, TEXAS A&M UNIVERSITY SYSTEM Internship Report by Luis Mena Submitted to the Department of Wildlife and Fisheries Sciences Texas A...&M University in partial fulfillment of the requirements for the degree of MASTER OF AGRICULTURE May 1991 Major Subject: Fisheries Sciences DESCRIPTION AND ANALYSIS OF THE SHRIMP RACEWAY RUN FOR THE SUMMER 1990, SHRIMP MARICULTURE PROJECT, TEXAS A...

Mena, Luis

1991-01-01T23:59:59.000Z

213

Supplement to the UMTRA Project water sampling and analysis plan, Ambrosia Lake, New Mexico  

SciTech Connect (OSTI)

The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is in McKinley County, New Mexico. As part of UMTRA surface remediation, residual radioactive materials were consolidated on the site in a disposal cell that was completed July 1995. The need for ground water monitoring was evaluated and found not to be necessary beyond the completion of the remedial action because the ground water in the uppermost aquifer is classified as limited use.

NONE

1995-08-01T23:59:59.000Z

214

NOR ANY DROP TO DRINK: An Analysis of The Jordan Red Sea Project and Reconciling  

E-Print Network [OSTI]

/yr ! Jordan River 1950s 1.3 BCM/yr FOA - UN #12;Amman Highlands AlGhor / Jordan Valley/ Wadi Araba Badia Dead as a stand-alone project" Al-Qimish 2:14-2:36 50 MCM # Amman 20 MCM # Aqaba, Wadi Araba 5 MCM # economic Valley/ Wadi Araba Badia Dead Sea (417m below sealevel) Red Sea #12;Phase 2 80 MCM # nuclear plant #12

Scott, Christopher

215

Project Proposal: Vigilance: Verified InvestiGatIve Lifestyle Analysis and Coordination Environment  

E-Print Network [OSTI]

devices, · Automatic data analysis and personal notifications (alerts, reminders, encouragement devices into a local, personal, multi-device platform for behavioral tracking and analysis. We plan, including patient vital signs, blood glucose levels, daily activities, etc., from a variety of personal

Bigelow, Stephen

216

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

217

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

218

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

219

THREE-DIMENSIONAL THERMAL MODELING ANALYSIS OF CST MEDIA FOR THE SMALL ION EXCHANGE PROJECT  

SciTech Connect (OSTI)

The Small Column Ion Exchange (SCIX) project is designed to accelerate closure of High Level Waste (HLW) tanks at the Savannah River Site (SRS). The SRS tanks store HLW in three forms: sludge, saltcake, and supernate. An in-tank ion exchange process is being designed to treat supernate and dissolved saltcake waste. Through this process, radioactive cesium from the salt solution is adsorbed into Crystalline Silicotitanate (CST) ion exchange media packed within a flow-through column. A packed column loaded with radioactive cesium generates significant heat from radiolytic decay. The waste supernate solution within the ion exchange bed will boil around 120 C. Solution superheating above the boiling point within the column could lead to violent hazardous energy releases. System heating from loaded CST is also of concern in other process modules, such as the waste tank. Due to tank structural integrity concerns, the wall temperature limit for the SRS waste tanks is 100 C. The transfer of cesium-loaded CST to the tank could result in localized hot spots on the tank floor and walls which may exceed this limit. As a result, thermal modeling calculations have been conducted to predict the maximum temperatures achievable both in the column and in the waste tank. As specified in the associated Technical Task Plan, one objective of the present work was to compute temperature distributions within the ion exchange column module under accident scenarios including loss of salt solution flow through the bed and loss of coolant system flow. The column modeling domain and the scope of the calculations in this case were broadened relative to previous two-dimensional calculations to include vertical temperature distributions within the packed bed of ion exchange media as well as the upper column plenum region containing only fluid. The baseline design conditions and in-column modeling domain for the ion-exchange column module are shown in Figure 1. These evaluations assumed the maximum bounding cesium loading considered possible based on current knowledge regarding CST media and the anticipated feed compositions. Since this cesium loading was considerably higher than the nominal loading conditions in SRS waste, cases with lower loading were also evaluated. Modeling parameters were the same as those used previously unless otherwise indicated. The current model does not capture multi-phase cooling mechanisms operative when solution boiling occurs. This feature is conservative in the sense that it does not account for the large cooling effects associated with phase transfer. However, the potential transfer of heat to the plenum region associated with vertical bubble ascension through the column during boiling is also neglected. Thermal modeling calculations were also performed for the entire waste storage tank for the case where loaded and ground CST was transferred to the tank. The modeling domain used for the in-tank calculations is provided in Figure 2. The in-tank domain is based on SRS Tank 41, which is a Type-IIIA tank. Temperature distributions were evaluated for cylindrical, ground CST mounds located on the tank floor. Media grinding is required prior to vitrification processing of the CST in the SRS Defense Waste Processing Facility (DWPF). The location of the heat source region on the tank floor due to the accumulation of CST material was assumed to be just under the grinder. The shape of the CST mound was assumed to be cylindrical. This shape is believed to be most representative of the actual mound shape formed in the tank, given that submersible mixing pumps will be available for media dispersion. Alternative configurations involving other geometrical shapes for the CST mound were evaluated in the previous work. Sensitivity analysis for the in-tank region was performed for different amounts of CST media. As was the case for the in-column model, the in-tank model does not include multi-phase cooling mechanisms operative when solution boiling occurs. The in-column and the in-tank evaluations incorporated recently updated maximum cesi

Lee, S.; King, W.

2011-09-12T23:59:59.000Z

220

Analysis of dc harmonics using the three-pulse model for the intermountain power project HVDC transmission  

SciTech Connect (OSTI)

The harmonic analysis of the dc-side of an HVDC line transmission requires realistic models of the converters, the dc line, and other relevant equipment. These models must include all important paths for harmonic current, and appropriate sources of harmonic voltage generation. The classical converter modeling technique has been demonstrated to be insufficient in field measurements and analysis of the harmonic spectra found on recent HVDC line transmission. For this reason, a new model of the converter bridge which takes into account the major stray capacitances in the converter (the three-pulse model) has been developed, and is described in detail elsewhere. This paper presents comparisons between the classical and three-pulse calculations for the Intermountain Power Project (IPP) HVDC transmission. The calculation results from the three-pulse model agree favorably with the harmonics found in field measurements.

Dickmander, D.L.; Peterson, K.J.

1989-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

222

2012 Annual Workforce Analysis and Staffing Plan Report- West Valley Demonstration Project  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

223

2010 Annual Workforce Analysis and Staffing Plan Report- Portsmouth Paducah Project Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

224

2011 Annual Workforce Analysis and Staffing Plan Report- Portsmouth Paducah Project Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

225

2012 Annual Workforce Analysis and Staffing Plan Report- Portsmouth Paducah Project Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

226

2013 Annual Workforce Analysis and Staffing Plan Report- Portsmouth Paducah Project Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

227

Constructing Predictive Estimates for Worker Exposure to Radioactivity During Decommissioning: Analysis of Completed Decommissioning Projects - Master Thesis  

SciTech Connect (OSTI)

An analysis of completed decommissioning projects is used to construct predictive estimates for worker exposure to radioactivity during decommissioning activities. The preferred organizational method for the completed decommissioning project data is to divide the data by type of facility, whether decommissioning was performed on part of the facility or the complete facility, and the level of radiation within the facility prior to decommissioning (low, medium, or high). Additional data analysis shows that there is not a downward trend in worker exposure data over time. Also, the use of a standard estimate for worker exposure to radioactivity may be a best estimate for low complete storage, high partial storage, and medium reactor facilities; a conservative estimate for some low level of facility radiation facilities (reactor complete, research complete, pits/ponds, other), medium partial process facilities, and high complete research facilities; and an underestimate for the remaining facilities. Limited data are available to compare different decommissioning alternatives, so the available data are reported and no conclusions can been drawn. It is recommended that all DOE sites and the NRC use a similar method to document worker hours, worker exposure to radiation (person-rem), and standard industrial accidents, injuries, and deaths for all completed decommissioning activities.

Dettmers, Dana Lee; Eide, Steven Arvid

2002-10-01T23:59:59.000Z

228

Selected Area Fishery Evaluation Project Economic Analysis Study Final Report, Final Draft Revision 4: November 10, 2006.  

SciTech Connect (OSTI)

The purpose of this Study is to provide an economic review of current and proposed changes to the Select Area Fishery Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint review dated March 2005 by the Northwest Power and Conservation Council (NPCC) Independent Scientific Review Panel (ISRP) and Independent Economic Analysis Board (IEAB). North et al. (2006) addressed technical questions about operations and plans, and this report contains the response information for comments concerning Project economics. This report can be considered an economic feasibility review meeting guidelines for cost-effective analysis developed by the IEAB (2003). It also contains other economic measurement descriptions to illustrate the economic effects of SAFE. The SAFE is an expansion of a hatchery project (locally called the Clatsop Economic Development Council Fisheries Project or CEDC) started in 1977 that released an early run coho (COH) stock into the Youngs River. The Youngs River entrance to the Columbia River at River Mile 12 is called Youngs Bay, which is located near Astoria, Oregon. The purpose of the hatchery project was to provide increased fishing opportunities for the in-river commercial fishing gillnet fleet. Instead of just releasing fish at the hatchery, a small scale net pen acclimation project in Youngs Bay was tried in 1987. Hirose et al. (1998) found that 1991-1992 COH broodstock over-wintered at the net pens had double the smolt-to-adult return rate (SAR) of traditional hatchery release, less than one percent stray rates, and 99 percent fishery harvests. It was surmised that smolts from other Columbia River hatcheries could be hauled to the net pens for acclimation and release to take advantage of the SAR's and fishing rates. Proposals were tendered to Bonneville Power Administration (BPA) and other agencies to fund the expansion for using other hatcheries smolts and other off-channel release sites. The BPA, who had been providing funds to the Project since 1982, greatly increased their financial participation for the experimental expansion of the net pen operations in 1993. Instead of just being a funding partner in CEDC operations, the BPA became a major financing source for other hatchery production operations. The BPA has viewed the 10 plus years of funding since then as an explorative project with two phases: a 'research' phase ending in 1993, and a 'development' phase ending in 2006. The next phase is referred to in proposals to BPA for continued funding as an 'establishment' phase to be started in 2007. There are three components of SAFE: (1) The CEDC owns and operates the net pens in the Columbia River estuary on the Oregon side. The CEDC also owns and operates a hatchery on the South Fork Klaskanine River. (2) There are many other hatcheries contributing smolts to the net pen operations. The present suite of hatcheries are operated by the Washington Department of Fish and Wildlife (WDFW) and Oregon Department of Fish and Wildlife (ODFW). The WDFW owns and operates the net pens at Deep River on the Washington side of the Columbia River. (3) The monitoring and evaluation (M&E) responsibilities are performed by employees of WDFW and ODFW. BPA provides funding for all three components as part of NPCC Project No. 199306000. The CEDC and other contributing hatcheries have other sources of funds that also support the SAFE. BPA's minor share (less than 10 percent) of CEDC funding in 1982 grew to about 55 percent in 1993 with the beginning of the development phase of the Project. The balance of the CEDC budget over the years has been from other federal, state, and local government programs. It has also included a 10 percent fee assessment (five percent of ex-vessel value received by harvesters plus five percent of purchase value made by processors) on harvests that take place in off-channel locations near the release sites. The CEDC total annual budget in the last several years has been in the $600 to $700 thousand range. The Project over

Bonneville Power Administration; Washington Department of Fish and Wildlife; Oregon Department of Fish and Wildlife

2006-11-01T23:59:59.000Z

229

Testing gravitational-wave searches with numerical relativity waveforms: Results from the first Numerical INJection Analysis (NINJA) project  

E-Print Network [OSTI]

The Numerical INJection Analysis (NINJA) project is a collaborative effort between members of the numerical relativity and gravitational-wave data analysis communities. The purpose of NINJA is to study the sensitivity of existing gravitational-wave search algorithms using numerically generated waveforms and to foster closer collaboration between the numerical relativity and data analysis communities. We describe the results of the first NINJA analysis which focused on gravitational waveforms from binary black hole coalescence. Ten numerical relativity groups contributed numerical data which were used to generate a set of gravitational-wave signals. These signals were injected into a simulated data set, designed to mimic the response of the Initial LIGO and Virgo gravitational-wave detectors. Nine groups analysed this data using search and parameter-estimation pipelines. Matched filter algorithms, un-modelled-burst searches and Bayesian parameter-estimation and model-selection algorithms were applied to the data. We report the efficiency of these search methods in detecting the numerical waveforms and measuring their parameters. We describe preliminary comparisons between the different search methods and suggest improvements for future NINJA analyses.

Benjamin Aylott; John G. Baker; William D. Boggs; Michael Boyle; Patrick R. Brady; Duncan A. Brown; Bernd Brgmann; Luisa T. Buchman; Alessandra Buonanno; Laura Cadonati; Jordan Camp; Manuela Campanelli; Joan Centrella; Shourov Chatterji; Nelson Christensen; Tony Chu; Peter Diener; Nils Dorband; Zachariah B. Etienne; Joshua Faber; Stephen Fairhurst; Benjamin Farr; Sebastian Fischetti; Gianluca Guidi; Lisa M. Goggin; Mark Hannam; Frank Herrmann; Ian Hinder; Sascha Husa; Vicky Kalogera; Drew Keppel; Lawrence E. Kidder; Bernard J. Kelly; Badri Krishnan; Pablo Laguna; Carlos O. Lousto; Ilya Mandel; Pedro Marronetti; Richard Matzner; Sean T. McWilliams; Keith D. Matthews; R. Adam Mercer; Satyanarayan R. P. Mohapatra; Abdul H. Mrou; Hiroyuki Nakano; Evan Ochsner; Yi Pan; Larne Pekowsky; Harald P. Pfeiffer; Denis Pollney; Frans Pretorius; Vivien Raymond; Christian Reisswig; Luciano Rezzolla; Oliver Rinne; Craig Robinson; Christian Rver; Luca Santamara; Bangalore Sathyaprakash; Mark A. Scheel; Erik Schnetter; Jennifer Seiler; Stuart L. Shapiro; Deirdre Shoemaker; Ulrich Sperhake; Alexander Stroeer; Riccardo Sturani; Wolfgang Tichy; Yuk Tung Liu; Marc van der Sluys; James R. van Meter; Ruslan Vaulin; Alberto Vecchio; John Veitch; Andrea Vicer; John T. Whelan; Yosef Zlochower

2009-07-09T23:59:59.000Z

230

Projections of local atomic structure revealed by wavelet analysis of x-ray absorption anisotropy P. Korecki,1,* D. V. Novikov,2 and M. Tolkiehn2  

E-Print Network [OSTI]

Projections of local atomic structure revealed by wavelet analysis of x-ray absorption anisotropy P x-ray field amplitude at the sites of absorbing atoms and effectively changes the atomic absorption in an experiment a wavelet transform approach for analysis of x-ray absorption anisotropy XAA patterns recorded

Korecki, Pawe³

231

Ground-water sample collection and analysis plan for the ground-water surveillance project  

SciTech Connect (OSTI)

The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy`s (DOE`s) Hanford Site in support of DOE`s environmental surveillance responsibilities. The purpose of this document is to translate DOE`s General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives.

Bryce, R.W.; Evans, J.C.; Olsen, K.B.

1991-12-01T23:59:59.000Z

232

Ground-water sample collection and analysis plan for the ground-water surveillance project  

SciTech Connect (OSTI)

The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives.

Bryce, R.W.; Evans, J.C.; Olsen, K.B.

1991-12-01T23:59:59.000Z

233

Estimating contact rates at a mass gathering by using video analysis: a proof-of-concept project  

SciTech Connect (OSTI)

Current approaches for estimating social mixing patterns and infectious disease transmission at mass gatherings have been limited by various constraints, including low participation rates for volunteer-based research projects and challenges in quantifying spatially and temporally accurate person-to-person interactions. We developed a proof-of-concept project to assess the use of automated video analysis for estimating contact rates of attendees of the GameFest 2013 event at Rensselaer Polytechnic Institute (RPI) in Troy, New York. Video tracking and analysis algorithms were used to estimate the number and duration of contacts for 5 attendees during a 3-minute clip from the RPI video. Attendees were considered to have a contact event if the distance between them and another person was =1 meter. Contact duration was estimated in seconds. We also simulated 50 attendees assuming random mixing using a geo-spatially accurate representation of the same GameFest location. The 5 attendees had an overall median of 2 contact events during the 3-minute video clip (range: 0 6). Contact events varied from less than 5 seconds to the full duration of the 3- minute clip. The random mixing simulation was visualized and presented as a contrasting example. We were able to estimate the number and duration of contacts for five GameFest attendees from a 3-minute video clip that can be compared to a random mixing simulation model at the same location. The next phase will involve scaling the system for simultaneous analysis of mixing patterns from hours-long videos and comparing our results with other approaches for collecting contact data from mass gathering attendees.

Rainey, Jeanette J [ORNL; Cheriyadat, Anil M [ORNL; Radke, Richard J [ORNL; Crumly, Julie K [ORNL; Koch, Daniel B [ORNL

2014-01-01T23:59:59.000Z

234

Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis  

SciTech Connect (OSTI)

This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energys mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

David Duncan

2009-10-01T23:59:59.000Z

235

Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis  

SciTech Connect (OSTI)

This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energys mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

David Duncan

2010-06-01T23:59:59.000Z

236

Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis  

SciTech Connect (OSTI)

This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energys mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

David Duncan

2011-03-01T23:59:59.000Z

237

Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis  

SciTech Connect (OSTI)

This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energys mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

David Duncan

2011-04-01T23:59:59.000Z

238

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

239

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

240

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

A vegetational analysis of the Phillips Agricultural Demonstration Project Ranch, Foraker, Oklahoma  

E-Print Network [OSTI]

. Jerry Tomanek, Professor of Range Ecology, Fort Hayes Kansas State Cnllegs~ for:. is helpful advice and cr' ticism. Sincere appreoiation is expressed to the many otherss too numerous to mention by name, for their assistance throughout this study? 88... Unite of Range Sites. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 4 ~ ~ ~ ~ ~ ~ ~ ~ 9 ~ ~ ~ ~ ~ ~ ~ ~ 18 ~ ~ ~ ~ ~ ~ ~ ~ 2) VII Relative Composition-Determined by the Point Quadrat Method of Analysis ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ )8 VIII Range...

Gardner, Ronald Gilbert

1958-01-01T23:59:59.000Z

242

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

13. Washington, D.C. : Renewable Energy Policy Project. (Commissioners. Renewable Energy Policy Project (REPP). 2001.impacts of RPS policies on renewable energy deployment by

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

243

Project Name Project Number Tagging Type  

E-Print Network [OSTI]

Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

244

Administration and Finance Weekly Activity Report  

E-Print Network [OSTI]

Administration and Finance Weekly Activity Report Week Ending: February 28, 2014 · Administration and Finance Website ­ The website for Administration and Finance has been successfully migrated into NMSU Administration and Finance forms page. · New Collections System ­ Working in conjunction with the University

245

Administration and Finance Weekly Activity Report  

E-Print Network [OSTI]

Hearings for FY2014 - 2015 Equipment Renewal and Replacement Funding ­ The University Budget Committee (UBC) met on June 4th and 5th to hear requests from colleges and units for ERR funding for FY 2015· Administration and Finance · Weekly Activity Report · Week Ending: June 6, 2014 · · Budget

Nishiguchi, Michele

246

Weighing the Costs and Benefits of Renewables Portfolio Standards:A Comparative Analysis of State-Level Policy Impact Projections  

SciTech Connect (OSTI)

State renewables portfolio standards (RPS) have emerged as one of the most important policy drivers of renewable energy capacity expansion in the U.S. Collectively, these policies now apply to roughly 40% of U.S. electricity load, and may have substantial impacts on electricity markets, ratepayers, and local economies. As RPS policies have been proposed or adopted in an increasing number of states, a growing number of studies have attempted to quantify the potential impacts of these policies, focusing primarily on projecting cost impacts, but sometimes also estimating macroeconomic and environmental effects. This report synthesizes and analyzes the results and methodologies of 28 distinct state or utility-level RPS cost impact analyses completed since 1998. Together, these studies model proposed or adopted RPS policies in 18 different states. We highlight the key findings of these studies on the costs and benefits of RPS policies, examine the sensitivity of projected costs to model assumptions, assess the attributes of different modeling approaches, and suggest possible areas of improvement for future RPS analysis.

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-16T23:59:59.000Z

247

The Human Microbiome Project (HMP) and the Data Analysis and Coordination Center (DAAC) portal to the HMP (GSC8 Meeting)  

ScienceCinema (OSTI)

The Genomic Standards Consortium was formed in September 2005. It is an international, open-membership working body which promotes standardization in the description of genomes and the exchange and integration of genomic data. The 2009 meeting was an activity of a five-year funding "Research Coordination Network" from the National Science Foundation and was organized held at the DOE Joint Genome Institute with organizational support provided by the JGI and by the University of California - San Diego. George Weinstock from Washington University School of Medicine talks about the Human Microbiome Project (HMP) followed briefly by Jennifer Wortman from the University of Maryland School of Medicine on the Data Analysis and Coordination Center (DACC) portal to the HMP at the Genomic Standards Consortium's 8th meeting at the DOE JGI in Walnut Creek, Calif. on Sept. 9, 2009.

Weinstock, George [Washington University School of Medicine]; Wortman, Jennifer [University of Maryland School of Medicine

2011-04-29T23:59:59.000Z

248

Technical documentation in support of the project-specific analysis for construction and operation of the National Ignition Facility  

SciTech Connect (OSTI)

This document provides information that supports or supplements the data and impact analyses presented in the National Ignition Facility (NIF) Project-Specific Analysis (PSA). The purposes of NIF are to achieve fusion ignition in the laboratory for the first time with inertial confinement fusion (ICF) technology and to conduct high- energy-density experiments ins support of national security and civilian application. NIF is an important element in the DOE`s science-based SSM Program, a key mission of which is to ensure the reliability of the nation`s enduring stockpile of nuclear weapons. NIF would also advance the knowledge of basic and applied high-energy- density science and bring the nation a large step closer to developing fusion energy for civilian use. The NIF PSA includes evaluations of the potential environmental impacts of constructing and operating the facility at one of five candidate site and for two design options.

Lazaro, M.A.; Vinikour, W. [Argonne National Lab., IL (United States). Environmental Assessment Div.; Allison, T. [Argonne National Lab., IL (United States). Decision and Information Sciences Div.] [and others

1996-09-01T23:59:59.000Z

249

Equilibrium Response and Transient Dynamics Datasets from VEMAP: Vegetation/Ecosystem Modeling and Analysis Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Users of the VEMAP Portal can access input files of numerical data that include monthly and daily files of geographic data, soil and site files, scenario files, etc. Model results from Phase I, the Equilibrium Response datasets, are available through the NCAR anonymous FTP site at http://www.cgd.ucar.edu/vemap/vresults.html. Phase II, Transient Dynamics, include climate datasets, models results, and analysis tools. Many supplemental files are also available from the main data page at http://www.cgd.ucar.edu/vemap/datasets.html.

250

SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS  

SciTech Connect (OSTI)

This document is a Phase I deliverable for the Single-Shell Tank Analysis of Record effort. This document is not the Analysis of Record. The intent of this document is to guide the Phase II detailed modeling effort. Preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. The preliminary analysis document reviews and preliminary modeling analysis results are reported herein. In addition, this report provides recommendations for the next phase of the SST AOR project, SST detailed modeling. Efforts and results discussed in this report do not include seismic modeling as seismic modeling is covered by a separate report. The combined results of both static and seismic models are required to complete this effort. The SST AOR project supports the US Department of Energy's (DOE) Office of River Protection (ORP) mission for obtaining a better understanding of the structural integrity of Hanford's SSTs. The 149 SSTs, with six different geometries, have experienced a range of operating histories which would require a large number of unique analyses to fully characterize their individual structural integrity. Preliminary modeling evaluations were conducted to determine the number of analyses required for adequate bounding of each of the SST tank types in the Detailed Modeling Phase of the SST AOR Project. The preliminary modeling was conducted in conjunction with the Evaluation Criteria report, Johnson et al. (2010). Reviews of existing documents were conducted at the initial stage of preliminary modeling. These reviews guided the topics that were explored in the SST preliminary modeling. The reviews determined the level of detail necessary to perform the analyses of the SSTs. To guide the Phase II detailed modeling effort, preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. Conclusions were derived from case studies on one of the tank types when no additional runs of similar cases on other types of tanks were found necessary to derive those conclusions. The document reviews provided relatively complete temperature histories for Type IV tanks. The temperature history data for Type I, II, and III tanks was almost nonexistent for years prior to 1975. Document reviews indicate that there might be additional useful data in the US Department of Energy, Richland Operations Office (DOE-RL) records in Seattle, WA, and these records need to be reviewed to extract data that might have been disregarded during previous reviews. Thermal stress analyses were conducted using different temperature distribution scenarios on Type IV tanks. Such studies could not be carried out for other tank types due to lack of temperature history data. The results from Type IV tank analyses indicate that factors such as temperature distribution in the tank waste and rate of rise in waste temperature have a significant impact on the thermal stresses in the tank structures. Overall, the conclusion that can drawn from the thermal stress analyses is that these studies should be carried out for all tank types during the detailed analysis phase with temperature values that are reasonably close to the typical temperature histories of the respective tank types. If and/or when additional waste temperature data

RAST RS; RINKER MW; BAPANAALLI SK; DEIBLER JE; GUZMAN-LEONG CE; JOHNSON KI; KARRI NK; PILLI SP; SANBORN SE

2010-10-22T23:59:59.000Z

251

Waste Tank Organic Safety Project: Analysis of liquid samples from Hanford waste tank 241-C-103  

SciTech Connect (OSTI)

A suite of physical and chemical analyses has been performed in support of activities directed toward the resolution of an Unreviewed Safety Question concerning the potential for a floating organic layer in Hanford waste tank 241-C-103 to sustain a pool fire. The analysis program was the result of a Data Quality Objectives exercise conducted jointly with staff from Westinghouse Hanford Company and Pacific Northwest Laboratory (PNL). The organic layer has been analyzed for flash point, organic composition including volatile organics, inorganic anions and cations, radionuclides, and other physical and chemical parameters needed for a safety assessment leading to the resolution of the Unreviewed Safety Question. The aqueous layer underlying the floating organic material was also analyzed for inorganic, organic, and radionuclide composition, as well as other physical and chemical properties. This work was conducted to PNL Quality Assurance impact level III standards (Good Laboratory Practices).

Pool, K.H.; Bean, R.M.

1994-03-01T23:59:59.000Z

252

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

253

HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SUMMARY OF COMBINED THERMAL AND OPERATING LOADS WITH SEISMIC ANALYSIS  

SciTech Connect (OSTI)

This report summarizes the results of the Double-Shell Tank Thermal and Operating Loads Analysis (TaLA) combined with the Seismic Analysis. This combined analysis provides a thorough, defensible, and documented analysis that will become a part of the overall analysis of record for the Hanford double-shell tanks (DSTs). The bases of the analytical work presented herein are two ANSYS{reg_sign} finite element models that were developed to represent a bounding-case tank. The TaLA model includes the effects of temperature on material properties, creep, concrete cracking, and various waste and annulus pressure-loading conditions. The seismic model considers the interaction of the tanks with the surrounding soil including a range of soil properties, and the effects of the waste contents during a seismic event. The structural evaluations completed with the representative tank models do not reveal any structural deficiencies with the integrity of the DSTs. The analyses represent 60 years of use, which extends well beyond the current date. In addition, the temperature loads imposed on the model are significantly more severe than any service to date or proposed for the future. Bounding material properties were also selected to provide the most severe combinations. While the focus of the analyses was a bounding-case tank, it was necessary during various evaluations to conduct tank-specific analyses. The primary tank buckling evaluation was carried out on a tank-specific basis because of the sensitivity to waste height, specific gravity, tank wall thickness, and primary tank vapor space vacuum limit. For this analysis, the occurrence of maximum tank vacuum was classified as a service level C, emergency load condition. The only area of potential concern in the analysis was with the buckling evaluation of the AP tank, which showed the current limit on demand of l2-inch water gauge vacuum to exceed the allowable of 10.4 inches. This determination was based on analysis at the design waste temperature of 350 F and the full 60-year corrosion allowance on the tank wall of 0.060 inch. However, analysis at a more realistic temperature of 250 F or corrosion allowance of 0.025 inch results in an acceptable demand/capacity ratio according to the ASME code criteria. Thus, buckling of the primary tank is judged to be unlikely for the current lack of corrosion in the tanks, and the expectation that the maximum waste temperature will not exceed 210 F. The reinforced concrete structure was evaluated as specified by the American Concrete Institute (ACI) code requirements for nuclear safety-related structures (ACI-349). The demand was demonstrated to be lower than the capacity at all locations. Revision 1 is being issued to document changes to the anchor bolt evaluation. RPP-RPT-32237 Rev. 1, Hanford Double-Shell Tank Thermal and Seismic Project-Increased Liquid Level Analysis for 241AP Tank Farms, described changes to the anchor bolt modeling and evaluation which were implemented in response to the independent reviewer's comments. Similar changes have been made in the bounding tank analysis and are documented in RPP-RPT-28968 Rev. 1. The conclusions of the previous releases of this report remain unchanged.

MACKEY TC; DEIBLER JE; RINKER MW; JOHNSON KI; ABATT FG; KARRI NK; PILLI SP; STOOPS KL

2009-01-15T23:59:59.000Z

254

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

255

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

256

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

257

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

258

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

259

Techno-economic analysis of renewable energy source options for a district heating project  

SciTech Connect (OSTI)

With the increased interest in exploiting renewable energy sources for district heating applications, the economic comparison of viable options has been considered as an important step in making a sound decision. In this paper, the economic performance of several energy options for a district heating system in Vancouver, British Columbia, is studied. The considered district heating system includes a 10 MW peaking/ backup natural gas boiler to provide about 40% of the annual energy requirement and a 2.5 MW base-load system. The energy options for the base-load system include: wood pellet, sewer heat, and geothermal heat. Present values of initial and operating costs of each system were calculated over 25-year service life of the systems, considering depreciation and salvage as a negative cost item. It was shown that the wood pellet heat producing technologies provided less expensive energy followed by the sewer heat recovery, geothermal and natural gas systems. Among wood pellet technologies, the grate burner was a less expensive option than powder and gasifier technologies. It was found that using natural gas as a fuel source for the peaking/backup system accounted for more than 40% of the heat production cost for the considered district heating center. This is mainly due to the high natural gas prices which cause high operating costs over the service life of the district heating system. Variations in several economic inputs did not change the ranking of the technology options in the sensitivity analysis. However, it was found that the results were more sensitive to changes in operating costs of the system than changes in initial investment. It is economical to utilize wood pellet boilers to provide the base-load energy requirement of district heating systems Moreover, the current business approach to use natural gas systems for peaking and backup in district heating systems could increase the cost of heat production significantly.

Ghafghazi, S. [University of British Columbia, Vancouver; Sowlati, T. [University of British Columbia, Vancouver; Sokhansanj, Shahabaddine [ORNL; Melin, Staffan [University of British Columbia, Vancouver

2009-09-01T23:59:59.000Z

260

Mobility chains analysis of technologies for passenger cars and light duty vehicles fueled with biofuels : application of the Greet model to project the role of biomass in America's energy future (RBAEF) project.  

SciTech Connect (OSTI)

The Role of Biomass in America's Energy Future (RBAEF) is a multi-institution, multiple-sponsor research project. The primary focus of the project is to analyze and assess the potential of transportation fuels derived from cellulosic biomass in the years 2015 to 2030. For this project, researchers at Dartmouth College and Princeton University designed and simulated an advanced fermentation process to produce fuel ethanol/protein, a thermochemical process to produce Fischer-Tropsch diesel (FTD) and dimethyl ether (DME), and a combined heat and power plant to co-produce steam and electricity using the ASPEN Plus{trademark} model. With support from the U.S. Department of Energy (DOE), Argonne National Laboratory (ANL) conducted, for the RBAEF project, a mobility chains or well-to-wheels (WTW) analysis using the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed at ANL. The mobility chains analysis was intended to estimate the energy consumption and emissions associated with the use of different production biofuels in light-duty vehicle technologies.

Wu, M.; Wu, Y.; Wang, M; Energy Systems

2008-01-31T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

EIA). 2005. Annual Energy Outlook 2005 with Projections toEIA). 2006a. Annual Energy Outlook 2006 with Projections tosuch as from the EIAs Annual Energy Outlook or the EPRI/DOE

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

262

An economic analysis of the benefit-cost ratio of the proposed Millican Reservoir, with emphasis on the effects of the project on agricultural income  

E-Print Network [OSTI]

AN ECONOMIC ANALYSIS OF THE BENEFIT-COST RATIO OF THE PROPOSED MILLICAN RESERVOIR, WITH EMPHASIS ON THE EFFECTS OF THE PROJECT ON AGRICULTURAL INCOME A Thesis By WILLIAM DONALD FRANKLIN Submitted to the Graduate School of the Agricultural... and Mechanical College of Texas in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 1963 Major Subject: Agricultural Economics AN ECONOMIC ANALYSIS OF THE BENEFIT-COST RATIO OF THE PROPOSED MILLICAN RESERVOIR, WITH EMPHASIS...

Franklin, William Donald

2012-06-07T23:59:59.000Z

263

Math PUrview - Summer 1998 - Minority Science Students Project  

E-Print Network [OSTI]

Since 1986, Purdue has hosted the Minority Students Science Project (MSSP). This is a one-week summer program organized by Regina Todd Hicks, Director of...

264

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

265

Structural stability of the Weeks Island oil repository  

SciTech Connect (OSTI)

A 3-D finite element analysis was performed to evaluate the stability of the SPR upper and lower oil storage levels at Weeks Island. The mechanical analysis predicted stresses and strains from which pillar stability was inferred using a fracture criterion developed from previous testing of Weeks Island salt. This analysis simulated the sequential mining of the two levels and subsequent oil fill of the mine. The predicted subsidence rates compare well to those measured over the past few years. Predicted failure mechanisms agree with observations made at the time the mine was being modified for oil storage. The modeling technique employed here treats an infinite array of pillars and is a reasonable representation of the behavior at the center of the mine. This analysis predicts that the lower level pillars, at the center of the mine, have fractured and their stability at this time is questionable. Localized pillar fracturing is predicted and implies that the mine is entering a phase of continual time dependent deterioration. Continued and expanded monitoring of the facility and development of methods to assess and predict its behavior are more important now than ever.

Preece, D.S.; Ehgartner, B.L.

1994-06-01T23:59:59.000Z

266

Multichannel response analysis on 2D projection views for detection of clustered microcalcifications in digital breast tomosynthesis  

SciTech Connect (OSTI)

Purpose: To investigate the feasibility of a new two-dimensional (2D) multichannel response (MCR) analysis approach for the detection of clustered microcalcifications (MCs) in digital breast tomosynthesis (DBT). Methods: With IRB approval and informed consent, a data set of two-view DBTs from 42 breasts containing biopsy-proven MC clusters was collected in this study. The authors developed a 2D approach for MC detection using projection view (PV) images rather than the reconstructed three-dimensional (3D) DBT volume. Signal-to-noise ratio (SNR) enhancement processing was first applied to each PV to enhance the potential MCs. The locations of MC candidates were then identified with iterative thresholding. The individual MCs were decomposed with HermiteGaussian (HG) and LaguerreGaussian (LG) basis functions and the channelized Hotelling model was trained to produce the MCRs for each MC on the 2D images. The MCRs from the PVs were fused in 3D by a coincidence counting method that backprojects the MC candidates on the PVs and traces the coincidence of their ray paths in 3D. The 3D MCR was used to differentiate the true MCs from false positives (FPs). Finally a dynamic clustering method was used to identify the potential MC clusters in the DBT volume based on the fact that true MCs of clinical significance appear in clusters. Using two-fold cross validation, the performance of the 3D MCR for classification of true and false MCs was estimated by the area under the receiver operating characteristic (ROC) curve and the overall performance of the MCR approach for detection of clustered MCs was assessed by free response receiver operating characteristic (FROC) analysis. Results: When the HG basis function was used for MCR analysis, the detection of MC cluster achieved case-based test sensitivities of 80% and 90% at the average FP rates of 0.65 and 1.55 FPs per DBT volume, respectively. With LG basis function, the average FP rates were 0.62 and 1.57 per DBT volume at the same sensitivity levels. The difference in the two sets of basis functions for detection of MCs did not show statistical significance. Conclusions: The authors' experimental results indicate that the MCR approach is promising for the detection of MCs on PV images. The HG or LG basis functions are both effective in characterizing the signal response of MCs using the channelized Hotelling model. The coincidence counting method for fusion of the 2D MCR in 3D is an important step for FP reduction. Further study is underway to improve the MCR approach for microcalcification detection in DBT.

Wei, Jun, E-mail: jvwei@umich.edu; Chan, Heang-Ping; Hadjiiski, Lubomir M.; Helvie, Mark A.; Lu, Yao; Zhou, Chuan; Samala, Ravi [Department of Radiology, University of Michigan, Ann Arbor, Michigan 48109-5842 (United States)] [Department of Radiology, University of Michigan, Ann Arbor, Michigan 48109-5842 (United States)

2014-04-15T23:59:59.000Z

267

Parallel computation in efficient non-linear finite element analysis with applications to soft-ground tunneling project  

E-Print Network [OSTI]

Reliable prediction and control of ground movements represent an essential component of underground construction projects in congested urban environments, to mitigate against possible damage to adjacent structures and ...

Hsieh, Yo-Ming, 1973-

2004-01-01T23:59:59.000Z

268

Utility-Scale Solar 2012: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States  

E-Print Network [OSTI]

cases, is competitive with wind power projects in that sameother technologies like wind power, efficiency improvementssome cases, competitive with wind power (Wiser and Bolinger

Bolinger, Mark

2014-01-01T23:59:59.000Z

269

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

24 Wholesale Energy and Capacity Price Changes Projected byImpacts to Alternative Wholesale Electric Price Scenarios..24 Effect of Wholesale Market Price Reductions on RPS Rate

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

270

The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis  

E-Print Network [OSTI]

such concern is the potential impact of wind energy projectshas investigated the potential impact of wind projects onassessment of the potential impact of wind facilities on the

Hoen, Ben

2010-01-01T23:59:59.000Z

271

Biology Weekly December 4, 2014 1 Biology Weekly December 4, 2014  

E-Print Network [OSTI]

Biology Weekly ­ December 4, 2014 1 Biology Weekly December 4, 2014 BGSA Holiday Party It to enter the contest! Please purchase tickets from Leanne Elchyshyn in Stewart Biology W6/5, Dieta Hanson, as there is limited availability! Ask a CIANtist Did you know that... ...a list of shareable equipment for Biology

Kambhampati, Patanjali

272

Weekly Activity and Financial Report- 08/19/2011  

Broader source: Energy.gov [DOE]

The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act. The "Weekly Update" tab includes...

273

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

274

This Week In Engineering Around the COE  

E-Print Network [OSTI]

This Week In Engineering Around the COE Library Service Hours: Mon-Wed: 8:00am-midnight Thurs: 8 Student Services The FAMU-FSU College of Engineering is excited to announce that Ms. Frederika Manciagli of engineering student services, Dr. Subashini Iyer, assistant to the associate dean, Dr. Melodee Moore

275

IWSA WEEKLY UPDATE January 30, 2009  

E-Print Network [OSTI]

, including waste-to-energy, in New York's Hudson Valley. After her swearing in this week, Gillibrand the ten waste-to-energy facilities in New York. #12;A reminder: IWSA has moved. Our new location is: 1730 and Environment Coalition, a new caucus designed to push for policies that promote renewable energy and domestic

Columbia University

276

Willamette Math Problem of the Week  

E-Print Network [OSTI]

of "Zambonis For You" and their only driver. His job is to resurface the ice at the local skating rink. Wanting 32 key points on the ice rink, the zamboni will be wide enough to resurface every spot on the rinkWillamette Math Problem of the Week November 5 2007 An Ice Problem Tony Zamboni is the owner

Laison, Josh

277

Administration and Finance Weekly Activity Report  

E-Print Network [OSTI]

and Finance Semi-Annual Employee Meetings on May 6 and 7, 2014. · Fire Department attends 11th Annual Campus Fire Safety, Security & Risk Management Conference & Expo. FS Fire Deputy Chief Louis Huber and Fire this week was to identify campus buildings that should be on the turbine circuit so a plan can be generated

Nishiguchi, Michele

278

Energy and Society Section Handout Week 9  

E-Print Network [OSTI]

Power loss Loss of electrical power to heat in a resistor = 2 Key components of a power grid1 Energy and Society Section Handout ­ Week 9 Topics 1. Grid 2. Q&A on midterm 1. Grid Key Concepts 10 = 12 Total current = 10 = 100 b) The power is delivered to the distribution grid by a 240. k

Kammen, Daniel M.

279

Energy and Society Week 4 Section Solution  

E-Print Network [OSTI]

. What is the main flaw of GDP per capita as the development metric? ANS: Open end question. Main flaw1 9/17/2014 Energy and Society Week 4 Section Solution TOPIC 1: Energy & Development: [iClicker]-1. Influence = B. Energy consumption = (/$) C. Carbon = 2 (/) ANS: [C] Note carbon

Kammen, Daniel M.

280

Week 13: Chapter 13 Universal Gravitation  

E-Print Network [OSTI]

1 Week 13: Chapter 13 Universal Gravitation Newton's Law of Universal Gravitation Every particle placed near the small ones The angle of rotation was measured Law of Gravitation, cont's Third Law action-reaction pair Gravitation is a field force that always exists between two particles

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Research Administration & Finance Tip of the Week  

E-Print Network [OSTI]

Research Administration & Finance Tip of the Week Catalogue of Federal Domestic Assistance (CFDA) Overview What is a CFDA number? The Catalog of Federal Domestic Assistance (CFDA) is a government. The complete CFDA number is a five digit number, XX.XXX, where the first two digits represent the Funding

Salama, Khaled

282

Data Jam at New York Energy Week | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Data Jam at New York Energy Week Data Jam at New York Energy Week Addthis Duration 2:32 Topic Open Data...

283

The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis  

SciTech Connect (OSTI)

With wind energy expanding rapidly in the U.S. and abroad, and with an increasing number of communities considering wind power development nearby, there is an urgent need to empirically investigate common community concerns about wind project development. The concern that property values will be adversely affected by wind energy facilities is commonly put forth by stakeholders. Although this concern is not unreasonable, given property value impacts that have been found near high voltage transmission lines and other electric generation facilities, the impacts of wind energy facilities on residential property values had not previously been investigated thoroughly. The present research collected data on almost 7,500 sales of singlefamily homes situated within 10 miles of 24 existing wind facilities in nine different U.S. states. The conclusions of the study are drawn from eight different hedonic pricing models, as well as both repeat sales and sales volume models. The various analyses are strongly consistent in that none of the models uncovers conclusive evidence of the existence of any widespread property value impacts that might be present in communities surrounding wind energy facilities. Specifically, neither the view of the wind facilities nor the distance of the home to those facilities is found to have any consistent, measurable, and statistically significant effect on home sales prices. Although the analysis cannot dismiss the possibility that individual homes or small numbers of homes have been or could be negatively impacted, it finds that if these impacts do exist, they are either too small and/or too infrequent to result in any widespread, statistically observable impact.

Hoen, Ben; Wiser, Ryan; Cappers, Peter; Thayer, Mark; Sethi, Gautam

2009-12-02T23:59:59.000Z

284

Mechanical analysis and simulation of in-motion vehicle scales. Final report/project accomplishments summary, CRADA Number 95-KCP-1013  

SciTech Connect (OSTI)

A mechanical analysis and simulation was conducted on a weigh-in-motion vehicle scale used to weight motor trucks traveling at speeds of 2 to 45 mph. The objective of this project was to develop a detailed understanding of weigh-in-motion vehicle scale operation and system response to dynamic loading. AlliedSignal FM and T worked together with Cardinal Scale Manufacturing Company as a design team to determine the scale structure`s resonant frequency, determine a relationship between static and dynamic weights, determine variables that have significant influence on the accuracy of the scale, and design an algorithm that can be used to optimize the performance and simulate the operation of the scale. This project provided a detailed understanding of the weigh-in-motion scale operation and system response to dynamic loading. Weigh-in-motion scale engineers will use this knowledge to improve current scales and design new, improved scales. The project was completed as scheduled.

Hower, B.

1997-02-01T23:59:59.000Z

285

Project Year Project Title  

E-Print Network [OSTI]

-friendly visualization tools, such as Google Sketchup, do not enable structural analysis. This makes it extremely

Gray, Jeffrey J.

286

Orientation Week Events School of Computer Science  

E-Print Network [OSTI]

Orientation Week Events School of Computer Science September 9th ­ September 12th Monday 9th:00­10:30 Jack Cole 0.35 MSc Curriculum Overview 3 14:00­16:00 Jack Cole 1.33a Computer Science Junior Honours Location Event 1 9:30­10:30 Jack Cole 0.35 Welcome to First Year Computer Science Students 1 10

St Andrews, University of

287

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

data, the highest capital cost estimate in the 2010-2015multiply initial capital cost estimates by up to a factor ofand projected wind capital cost estimates from EPRI/DOE

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

288

PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States  

E-Print Network [OSTI]

loop biomass, and geothermal power, the inflation-adjustedas geothermal, microturbines, and combined heat and powerpower generated by certain types of renewable energy projects, including wind, closed- and open-loop biomass, geothermal,

Bolinger, Mark

2009-01-01T23:59:59.000Z

289

Stalled on the Road to the Market: Analysis of Field Experience with a Project to Promote Lighting Efficiency in India  

E-Print Network [OSTI]

1991. "Energy-Efficient Lighting in Brazil and India:on Energy-Efficient Lighting. Stockholm, Sweden. Katzev,with a Project to Promote Lighting Efficiency in India AJ.

Gadgil, A.J.

2008-01-01T23:59:59.000Z

290

Utility-Scale Solar 2012: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States  

E-Print Network [OSTI]

Treasury Departments Section 1603 Grant database, data frompilot projects, and based on Section 1603 grant data, havewith the help of the Section 1603 grant program) their heat

Bolinger, Mark

2014-01-01T23:59:59.000Z

291

Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSP.  

E-Print Network [OSTI]

??In recent decades, the use of construction manager-at-risk (CMAR) has surged as an innovative construction project delivery method in comparison to traditional competitive bid procurement (more)

Neidert, Andrew

2012-01-01T23:59:59.000Z

292

Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSP  

E-Print Network [OSTI]

. In total, the survey represented 108 Washington State Public Works construction projects procured using CMAR with an aggregate volume of $6.6 billion. The researchs survey results showed that 98% of the completed projects met or exceeded quality... of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved by: Chair of Committee, Leslie Feigenbaum Committee Members, James Smith Jesse Saginor...

Neidert, Andrew

2012-10-19T23:59:59.000Z

293

An analysis of the Cured-in-Place Pipe (CIPP) subproject of the sanitary sewer rehabilitation project  

SciTech Connect (OSTI)

The comprehensive rehabilitation of the Lawrence Livermore National Laboratory Sanitary Sewer System centers around a Cured-in-Place Pipe project. Driven by regulatory requirements to eliminate the potential for exfiltration, a careful condition assessment of the existing infrastructure was conducted. Under programmatic constraints to maintain continuous operations, the INLINER USA cured-in-place pipe system was selected as the appropriate technology, and the project is currently under contract.

Morrow, W.; Siemiatkoski, S.

1994-01-25T23:59:59.000Z

294

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

295

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

296

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

297

Weekly Highlights | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption byAbout PrintableBlender Net Production (Thousand BarrelsWeekly

298

Green Week 2011 | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGetGraphene's 3D CounterpartDepartment ofGreen Week 2011

299

U.S. Weekly Product Supplied  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"Click worksheet9,1,50022,3,,,,6,1,,781Title: Telephone: FAX:9,152 8,905Area: U.S.530 15,728 15,929Weekly

300

America Saves Week is here! | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuelsPropaneSecurityhere! America Saves Week is a

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT DYTRAN ANALYSIS OF SEISMICALLY INDUCED FLUID STRUCTURE INTERACTION IN A HANFORD DOUBLE SHELL PRIMARY TANK  

SciTech Connect (OSTI)

M&D Professional Services, Inc. (M&D) is under subcontract to Pacific Northwest National Laboratories (PNNL) to perform seismic analysis of the Hanford Site Double-Shell Tanks (DSTs) in support of a project entitled ''Double-Shell Tank (DSV Integrity Project-DST Thermal and Seismic Analyses)''. The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST System at Hanford in support of Tri-Party Agreement Milestone M-48-14. The work described herein was performed in support of the seismic analysis of the DSTs. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). The overall seismic analysis of the DSTs is being performed with the general-purpose finite element code ANSYS'. The global model used for the seismic analysis of the DSTs includes the DST structure, the contained waste, and the surrounding soil. The seismic analysis of the DSTs must address the fluid-structure interaction behavior and sloshing response of the primary tank and contained liquid. ANSYS has demonstrated capabilities for structural analysis, but has more limited capabilities for fluid-structure interaction analysis. The purpose of this study is to demonstrate the capabilities and investigate the limitations of the finite element code MSC.Dytranz for performing a dynamic fluid-structure interaction analysis of the primary tank and contained waste. To this end, the Dytran solutions are benchmarked against theoretical solutions appearing in BNL 1995, when such theoretical solutions exist. When theoretical solutions were not available, comparisons were made to theoretical solutions to similar problems, and to the results from ANSYS simulations. Both rigid tank and flexible tank configurations were analyzed with Dytran. The response parameters of interest that are evaluated in this study are the total hydrodynamic reaction forces, the impulsive and convective mode frequencies, the waste pressures, and slosh heights. To a limited extent, primary tank stresses are also reported. The capabilities and limitations of ANSYS for performing a fluid-structure interaction analysis of the primary tank and contained waste were explored in a parallel investigation and documented in a companion report (Carpenter and Abatt [2006]). The results of this study were used in conjunction with the results of the global ANSYS analysis reported in Carpenter et al. (2006) and the parallel ANSYS fluid-structure interaction analysis to help determine if a more refined sub-model of the primary tank is necessary to capture the important fluid-structure interaction effects in the tank and if so, how to best utilize a refined sub-model of the primary tank. The results of this study demonstrate that Dytran has the capability to perform fluid-structure interaction analysis of a primary tank subjected to seismic loading. With the exception of some isolated peak pressures and to a lesser extent peak stresses, the results agreed very well with theoretical solutions. The benchmarking study documented in Carpenter and Abatt (2006) showed that the ANSYS model used in that study captured much of the fluid-structure interaction (FSI) behavior, but did have limitations for predicting the convective response of the waste. While Dytran appears to have stronger capabilities for the analysis of the FSI behavior in the primary tank, it is more practical to use ANSYS for the global evaluation of the tank. Thus, Dytran served the purpose of helping to identify limitations in the ANSYS FSI analysis so that those limitations can be addressed in the structural evaluation of the primary tank.

MACKEY, T.C.

2006-03-14T23:59:59.000Z

302

Energy and Utility Project Review  

Broader source: Energy.gov [DOE]

The DNR's Office of Energy and Environmental Analysis is responsible for coordinating the review of all proposed energy and utility projects in the state. The Office provides project management...

303

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

304

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

305

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

306

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

307

Optical properties are an important way to understand how climate change is altering the oceans we rely on. Dr David Antoine leads the BIOCAREX project in improving analysis of optical  

E-Print Network [OSTI]

outline the context from which the BIO-optics and CARbon EXperiment (BIOCAREX) emerged? The project grew rely on. Dr David Antoine leads the BIOCAREX project in improving analysis of optical properties. Here the intensity of light in various spectral domains, hence the changes in water colour. Do you foresee any

Antoine, David

308

Building America Special Research Project: High-R Walls Case...  

Office of Environmental Management (EM)

Building America Special Research Project: High-R Walls Case Study Analysis Building America Special Research Project: High-R Walls Case Study Analysis This report considers a...

309

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

310

Photo of the Week: Air Supply | Department of Energy  

Energy Savers [EERE]

Every week, we'll feature our favorite energy-related photo here on Energy.gov, at Facebook.comEnergygov and on Twitter via @ENERGY. For other photos of the week, view our...

311

Weekly Wrap-Up: Testing Wind Blades, Converting Carbon Emissions...  

Broader source: Energy.gov (indexed) [DOE]

Weekly Wrap-Up: Testing Wind Blades, Converting Carbon Emissions, and Eco-Driving Weekly Wrap-Up: Testing Wind Blades, Converting Carbon Emissions, and Eco-Driving July 23, 2010 -...

312

Analysis of infiltration through a clay radon barrier at an UMTRA disposal cell. Uranium Mill Tailings Remedial Action Project  

SciTech Connect (OSTI)

An infiltration study was initiated in January 1988 to assess the percent saturation in, and infiltration through, clay radon barriers of typical Uranium Mill Tailings Remedial Action (UMTRA) Project disposal cells. Predicting infiltration through the radon barrier is necessary to evaluate whether the disposal cell will comply with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (40 CFR 192). The groundwater standards require demonstrating that tailings seepage will not cause background concentrations or maximum concentration limits (MCLs) to be exceeded at the downgradient edge of the disposal facility (the point of compliance, or POC). This demonstration generally consists of incorporating the predicted seepage flux and the concentration of the specific hazardous constituents into a contaminant transport model, and predicting the resultant concentrations at the POC. The infiltration study consisted of a field investigation to evaluate moisture conditions in the radon barrier of the completed Shiprock, New Mexico, UMTRA Project disposal cell and previously completed UMTRA Project disposal cells at Clive, Utah, and Burrell, Pennsylvania. Coring was conducted to measure percent saturation profiles in the radon barriers at these disposal cells. In addition, a detailed investigation of the Shiprock radon barrier was conducted to establish the effects of meteorological stresses on moisture conditions in the filter layer and radon barrier. The Shiprock infiltration study was also intended to characterize hydraulic gradients and operational unsaturated hydraulic conductivities in the radon barrier.

Not Available

1991-01-01T23:59:59.000Z

313

Data Polling Routine (PlotHood) to Generate Weekly Inspection Plots for Fort Hood, Texas  

E-Print Network [OSTI]

. For this part of the project, a weather station that includes temperature, humidity and solar sensors was installed at the west substation of Ft. Hood as part of Phase I of this project. Weekly inspection plots of electricity use at the main substation of Ft...-Phase II, p. ii TABLE OF CONTENTS General Abstract i Disclaimer iii Acknowledgments iv Provide Data Polling and Inspection Plots Generation Routine (PlotHood) Executive Summary 2 Existing Monitoring System 3 a- ESL Weather Station at the West Substation. 3...

Saman, N. F.; Reddy, T. A.; Haberl, J. S.; Claridge, D. E.; Turner, W. D.

1996-01-01T23:59:59.000Z

314

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

315

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.  

SciTech Connect (OSTI)

BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

316

A Collaborative Support System for the Review of Building Energy Data in the LoanSTAR Monitoring and Analysis Project  

E-Print Network [OSTI]

-driven review process. Utilization of these facilities to provide a computer-supported collaborative environment for the review of building energy analysis data is feasible. This paper addresses the requirements such a system must meet, and proposes a design...

Willis, D.; Haberl, J.

317

Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)  

SciTech Connect (OSTI)

This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

None

1992-09-18T23:59:59.000Z

318

Energy and Society GSI Section Notes Week of October 6, 2014  

E-Print Network [OSTI]

1 Energy and Society GSI Section Notes ­ Week of October 6, 2014 Content: 1. Economic Analysis 2/gallon. After ten years, the car can be sold for $2,000. Draw a cash-flow diagram for 10 years. What

Kammen, Daniel M.

319

HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT ESTABLISHMENT OF METHODOLOGY FOR TIME DOMAIN SOIL STRUCTURE INTERACTION ANALYSIS OF HANFORD DST  

SciTech Connect (OSTI)

M&D Professional Services, Inc. (M&D) is under subcontract to Pacific Northwest National Laboratories (PNNL) to perform seismic analysis of the Hanford Site Double-Shell Tanks (DSTs) in support of a project entitled ''Double-Shell Tank DSV Integrity Project-DST Thermal and Seismic Analyses''. The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST System at Hanford in support of Tri-Party Agreement Milestone M-48-14. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). The work statement provided to M&D (PNNL 2003) required that the seismic analysis of the DST assess the impacts of potentially non-conservative assumptions in previous analyses and account for the additional soil mass due to the as-found soil density increase, the effects of material degradation, additional thermal profiles applied to the full structure including the soil-structure response with the footings, the non-rigid (low frequency) response of the tank roof, the asymmetric seismic-induced soil loading, the structural discontinuity between the concrete tank wall and the support footing and the sloshing of the tank waste. The seismic analysis considers the interaction of the tank with the surrounding soil, and the effects of the primary tank contents. The DST and the surrounding soil are modeled as a system of finite elements. The depth and width of the soil incorporated into the analysis model are sufficient to obtain appropriately accurate analytical results. The analyses required to support the work statement differ from previous analysis of the DSTs in that the soil-structure interaction (SSI) model includes several (nonlinear) contact surfaces in the tank structure, and the contained waste must be modeled explicitly in order to capture the fluid-structure interaction behavior between the primary tank and contained waste. Soil-structure interaction analyses are traditionally solved in the frequency domain, but frequency domain analysis is limited to systems with linear responses. The nonlinear character of the coupled SSI model and tank structural model requires that the seismic analysis be solved in the time domain. However, time domain SSI analysis is somewhat nontraditional and requires that the appropriate methodology be developed and demonstrated. Moreover, the analysis of seismically induced fluid-structure interaction between the explicitly modeled waste and the primary tank must be benchmarked against known solutions to simpler problems before being applied to the more complex analysis of the DSTs. The objective of this investigation is to establish the methodology necessary to perform the required SSI analysis of the DSTs in the time domain. Specifically, the analysis establishes the capabilities and limitations of the time domain codes ANSYS and Dytran for performing seismic SSI analysis of the DSTs. The benchmarking of the codes Dytran and ANSYS for performing seismically induced fluid-structure interaction (FSI) between the contained waste and the DST primary tank are documented in Abatt (2006) and Carpenter and Abatt (2006), respectively. The results of those two studies show that both codes have the capability to analyze the fluid-structure interaction behavior of the primary tank and contained waste. As expected, Dytran appears to have more robust capabilities for FSI analysis. The ANSYS model used in that study captures much of the FSI behavior, but does have some limitations for predicting the convective response of the waste and possibly the response of the waste in the knuckle region of the primary tank. While Dytran appears to have somewhat stronger capabilities for the analysis of the FSI behavior in the primary tank, it is more practical for the overall analysis to use ANSYS. Thus, Dytran served the purpose of helping to identify limitations in the ANSYS FSI analysis so that those limitations can be addressed in the structural evaluation of the primary tank. The limitations of ANSYS for predicting the details of the convective

MACKEY, T.C.

2006-03-14T23:59:59.000Z

320

A Complexity Science-Based Framework for Global Joint Operations Analysis to Support Force Projection: LDRD Final Report.  

SciTech Connect (OSTI)

The military is undergoing a significant transformation as it modernizes for the information age and adapts to address an emerging asymmetric threat beyond traditional cold war era adversaries. Techniques such as traditional large-scale, joint services war gaming analysis are no longer adequate to support program evaluation activities and mission planning analysis at the enterprise level because the operating environment is evolving too quickly. New analytical capabilities are necessary to address modernization of the Department of Defense (DoD) enterprise. This presents significant opportunity to Sandia in supporting the nation at this transformational enterprise scale. Although Sandia has significant experience with engineering system of systems (SoS) and Complex Adaptive System of Systems (CASoS), significant fundamental research is required to develop modeling, simulation and analysis capabilities at the enterprise scale. This report documents an enterprise modeling framework which will enable senior level decision makers to better understand their enterprise and required future investments.

Lawton, Craig R.

2015-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

CONNECTICUT BIOFUELS TECHNOLOGY PROJECT  

SciTech Connect (OSTI)

DBS Energy Inc. (DBS) intends on using the Connecticut Biofuels Technology Project for the purpose of developing a small-scale electric generating systems that are located on a distributed basis and utilize biodiesel as its principle fuel source. This project will include research and analysis on the quality and applied use of biodiesel for use in electricity production, 2) develop dispatch center for testing and analysis of the reliability of dispatching remote generators operating on a blend of biodiesel and traditional fossil fuels, and 3) analysis and engineering research on fuel storage options for biodiesel of fuels for electric generation.

BARTONE, ERIK

2010-09-28T23:59:59.000Z

322

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied...

323

Structural analysis of closure cap barriers: A pre-test study for the Bentonite Mat Demonstration Project. Revision 1  

SciTech Connect (OSTI)

The Bentonite Mat Demonstration Project (BMDP) is a field demonstration study to determine the construction/installation requirements, permeability, and subsidence performance characteristics of a composite barrier. The composite barrier will consist of on-site sandy-clay blanketed by a bentonite mat and a flexible High Density Polyethylene (HDPE) liner (also called flexible membrane liner). Construction of one control test pad and three bentonite test pads are planned. The control test pad will be used to establish baseline data. Underneath the composite clay cap is a four feet thick loose sand layer in which cavities will be created by evacuation of sand. The present work provides a mathematical model for the BMDP. The mathematical model will be used to simulate the mechanical and structural responses of the composite clay cap during the testing processes. Based upon engineering experience and technical references, a set of nominal soil parameters have been selected.

Gong, Chung; Pelfrey, J.R.

1993-12-01T23:59:59.000Z

324

SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 2. Battelle Columbus Laboratories system requirements definition and system analysis  

SciTech Connect (OSTI)

System specifications, design criteria, and representative weather data necessary for the system evolution and preliminary design are generated. A detailed analysis and evaluation of the commercial-sized controlled environment agriculture system coupled with a solar energy system was conducted. A simulation model to test the performance of the greenhouse is presented. (BCS)

Not Available

1981-01-01T23:59:59.000Z

325

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

Energy Laboratory. Renewable Energy Policy Project (REPP).13. Washington, D.C. : Renewable Energy Policy Project. (of state RPS policies on renewable energy deployment by

Chen, Cliff

2009-01-01T23:59:59.000Z

326

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley of Texas: 2011 Ratings and Analysis  

E-Print Network [OSTI]

IN THE LOWER RIO GRANDE VALLEY OF TEXAS 2011 Ratings and Analysis October 7, 2011 By Gabriele Bonaiti Extension Associate Askar Karimov Extension Associate Guy Fipps, P.E. Professor and Extension Agricultural Engineer... Texas AgriLife Extension Service Irrigation Technology Center Biological and Agricultural Engineering 2117 TAMU College Station, TX 77843?2117 979?845?3977; http://idea.tamu.edu - 3 - EXECUTIVE SUMMARY Since 1999, nine (9) irrigation...

Bonaiti, Gabriele; Karimov, Askar; Fipps, Guy

327

Population Genomics Objective: To give a presentation of about 40-90 minutes duration at the end of the week covering the key aspects  

E-Print Network [OSTI]

Population Genomics Objective: To give a presentation of about 40-90 minutes duration at the end of the week covering the key aspects of the population genomics of humans. This 1000 genomes project is devoted to the exciting project, where the genomes of a 1000 individuals are to be sequenced in the next

Goldschmidt, Christina

328

Computational Modeling of the Heart Objective: To give a presentation of about 60 minutes at the end of the week covering the key aspects of understanding the  

E-Print Network [OSTI]

Computational Modeling of the Heart Objective: To give a presentation of about 60 minutes at the end of the week covering the key aspects of understanding the heart by computational means, multilevel project is the so called physiome project (www.physiome.org), where the human heart is being

Goldschmidt, Christina

329

The Karjat Drinking Water Project GISE (CSE)-CTARA  

E-Print Network [OSTI]

/ 11 #12;Analysis Project- since 2008 Rs. 1500 crores in watershed development. Planning of small hydro

Sohoni, Milind

330

Analysis of Low-Temperature Utilization of Geothermal Resources...  

Open Energy Info (EERE)

Analysis Project Type Topic 2 Geothermal Analysis Project Description In this proposal West Virginia University (WVU) outline a project which will perform an in-depth analysis...

331

Advanced Seismic Data Analysis Program (The Hot Pot Project), DOE Award: DE-EE0002839, Phase 1 Report  

SciTech Connect (OSTI)

A five-line (23 mile) reflection- seismic survey was conducted at the Hot Pot geothermal prospect area in north-central Nevada under the USDOE (United States Department of Energy) Geothermal Technologies Program. The project objective was to utilize innovative seismic data processing, integrated with existing geological, geophysical and geochemical information, to identify high-potential drilling targets and to reduce drilling risk. Data acquisition and interpretation took place between October 2010 and April 2011. The first round of data processing resulted in large areas of relatively poor data, and obvious reflectors known from existing subsurface information either did not appear on the seismic profiles or appeared at the wrong depth. To resolve these issues, the velocity model was adjusted to include geologic input, and the lines were reprocessed. The resulting products were significantly improved, and additional detail was recovered within the high-velocity and in part acoustically isotropic basement. Features visible on the improved seismic images include interpreted low angle thrust faults within the Paleozoic Valmy Formation, which potentially are reactivated in the current stress field. Intermediate-depth wells are currently targeted to test these features. The seismic images also suggest the existence of Paleogene sedimentary and volcanic rocks which potentially may function as a near- surface reservoir, charged by deeper structures in Paleozoic rocks.

Oski Energy, LLC,

2013-03-28T23:59:59.000Z

332

TEST DISORDER CPT TAT COST 81331 4 weeks $525  

E-Print Network [OSTI]

,400 81406 4 weeks $1,000 NDE1 sequencing 81405 4 - 6 weeks $1,000 81404 4 weeks $1,000 OCLN sequencing** MCPH tier 2 Sequencing Panel(ARFGEF2, CASC5, CDK5RAP2, CENPJ, CEP63, CEP135, CEP152, MCPH1, MED17, NDE1 (MECP2,TCF4, SLC9A6 and UBE3A sequencing and deletion/duplication) NDE1 deletion/duplication by array

Ober, Carole

333

The human genome project  

SciTech Connect (OSTI)

The Human Genome Project will obtain high-resolution genetic and physical maps of each human chromosome and, somewhat later, of the complete nucleotide sequence of the deoxyribonucleic acid (DNA) in a human cell. The talk will begin with an extended introduction to explain the Project to nonbiologists and to show that map construction and sequence determination require extensive computation in order to determine the correct order of the mapped entities and to provide estimates of uncertainty. Computational analysis of the sequence data will become an increasingly important part of the project, and some computational challenges are described. 5 refs.

Bell, G.I.

1991-06-01T23:59:59.000Z

334

Small Business Week 2011: Meyer Tool and Manufacturing provides...  

National Nuclear Security Administration (NNSA)

Week 2011: Meyer Tool and Manufacturing provides NNSA with technical engineering, professional services | National Nuclear Security Administration Facebook Twitter Youtube Flickr...

335

Smart Grid Week: Hurricane Season and the Department's Efforts...  

Broader source: Energy.gov (indexed) [DOE]

Season and the Department's Efforts to Make the Grid More Resilient to Power Outages Smart Grid Week: Hurricane Season and the Department's Efforts to Make the Grid More...

336

Structural analysis of closure cap barriers: A pre-test study for the Bentonite Mat Demonstration Project  

SciTech Connect (OSTI)

According to the EPA-recommended closure cap design a waste site can either be covered with a single layer cap made of 36 inches of compacted soil (clay) or with a multilayer cap consisting of an upper vegetative layer underlain by a drainage layer over a low permeability layer. The Bentonite Mat Demonstration Project (BMDP) is a field demonstration study to determine the construction/installation requirements, permeability, and subsidence performance characteristics of a composite barrier. The composite barrier will consist of on-site sandy-clay blanketed by a bentonite mat and a flexible High Density Polyethylene (HDPE) liner (also called flexible membrane liner). Construction of one control test pad and three bentonite test pads are planned. The control test pad will be used to establish baseline data. Underneath the composite clay cap is a four-foot loose sand layer in which cavities will be created by evacuation of sand. The present work provides a mathematical model for the BMDP. The mathematical model will be used to simulate the mechanical and structural responses of the composite clay cap during the testing processes. Based upon engineering experience and technical references, a set of nominal soil parameters have been selected. Currently, detailed soil test data and cavity configuration data are not available to validate the mathematical model. Since the configuration of the cavities created in the testing process is irregular and unpredictable, two extreme configurations are considered in this mathematical model, viz., the circular cavity and the infinitely long trench in the sand underneath the cap. This approach will provide bounds for the testing results.

Gong, Chung

1993-10-01T23:59:59.000Z

337

Important reminders for block grant projects October 24, 2011  

E-Print Network [OSTI]

Important reminders for block grant projects October 24, 2011 EECBG Grant Recipients-- Thank you of government may retain original weekly certified payrolls in accordance with DBA and submit copies@energy.state.ca.us. #12;Recipients that are not local units of government must submit the original signed weekly certified

338

Grand Junction projects office mixed-waste treatment program, VAC*TRAX mobile treatment unit process hazards analysis  

SciTech Connect (OSTI)

The objective of this report is to demonstrate that a thorough assessment of the risks associated with the operation of the Rust Geotech patented VAC*TRAX mobile treatment unit (MTU) has been performed and documented. The MTU was developed to treat mixed wastes at the US Department of Energy (DOE) Albuquerque Operations Office sites. The MTU uses an indirectly heated, batch vacuum dryer to thermally desorb organic compounds from mixed wastes. This process hazards analysis evaluated 102 potential hazards. The three significant hazards identified involved the inclusion of oxygen in a process that also included an ignition source and fuel. Changes to the design of the MTU were made concurrent with the hazard identification and analysis; all hazards with initial risk rankings of 1 or 2 were reduced to acceptable risk rankings of 3 or 4. The overall risk to any population group from operation of the MTU was determined to be very low; the MTU is classified as a Radiological Facility with low hazards.

Bloom, R.R.

1996-04-01T23:59:59.000Z

339

Comments on: National Nuclear Science Week 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and UserofProtein structureAnalysis of Parton

340

HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT INCREASED LIQUID LEVEL ANALYSIS FOR 241-AP TANK FARMS  

SciTech Connect (OSTI)

The essential difference between Revision 1 and the original issue of this report is the analysis of the anchor bolts that tie the steel dome of the primary tank to the concrete tank dome. The reevaluation of the AP anchor bolts showed that (for a given temperature increase) the anchor shear load distribution did not change significantly from the initially higher stiffness to the new secant shear stiffness. Therefore, the forces and displacements of the other tank components such as the primary tanks stresses, secondary liner strains, and concrete tank forces and moments also did not change significantly. Consequently, the revised work in Revision 1 focused on the changes in the anchor bolt responses and a full reevaluation of all tank components was judged to be unnecessary.

TC MACKEY; JE DEIBLER; MW RINKER; KI JOHNSON; SP PILLI; NK KARRI; FG ABATT; KL STOOPS

2009-01-14T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Project Construction  

Broader source: Energy.gov [DOE]

Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

342

Magnesium Projects  

Broader source: Energy.gov (indexed) [DOE]

cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

343

FOOD GUIDELINES --WEEKLY STUDENT ORGANIZATION MEETING ONLY January 31, 2006  

E-Print Network [OSTI]

FOR PERISHABLE AND NON-PERISHABLE FOOD AND BEVERAGES Service or sale of homemade food at weekly meetingsFOOD GUIDELINES -- WEEKLY STUDENT ORGANIZATION MEETING ONLY January 31, 2006 Student Activities and Campus Life Associated Students / Aztec Center Meeting Services Environmental Health & Safety Dept Aztec

Ponce, V. Miguel

344

Free Processes via Matrix Theory Concentration week on free Probability  

E-Print Network [OSTI]

Free Processes via Matrix Theory Concentration week on free Probability Texas A&M, July 9-13. Nizar Demni Paris VI University July 10, 2007 Nizar Demni Paris VI University Free Processes via Matrix Theory Concentration week on free Pr #12;Definitions Non commutative probability space : Unital Algebra A + linear

Anshelevich, Michael

345

Deutsche Sommerschule am Pazifik Application Instructions --5-week program  

E-Print Network [OSTI]

Deutsche Sommerschule am Pazifik Application Instructions -- 5-week program Enclosed is your application for the 5-week program of the Deutsche Sommerschule am Pazifik, including a scholarship that these applications are considered in order of receipt, so early application is strongly recommended. The Deutsche

346

2011 Colorado Wildfire Season September 12, 2011 Weekly Update  

E-Print Network [OSTI]

Page 1 2011 Colorado Wildfire Season September 12, 2011 Weekly Update About this report: This weekly wildfire report is provided by the Colorado State Forest Service to keep you current on the fire situation in Colorado. The report will be released every Monday from May 2 to Oct. 24, along with daily

Hardy, Darel

347

Geothermal power plant R and D: an analysis of cost-performance tradeoffs and the Heber Binary-Cycle Demonstration Project  

SciTech Connect (OSTI)

A study of advancements in power plant designs for use at geothermal resources in the low to moderate (300 to 400F) temperature range is reported. In 3 case studies, the benefits of R and D to achieve these advancements are evaluated in terms of expected increases in installed geothermal generating capacity over the next 2 decades. A parametric sensitivity study is discussed which analyzes differential power development for combinations of power plant efficiency and capitol cost. Affordable tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described. Included in this assessment is an analysis of each of the major cost components of the project, including (1) construction cost, (2) well field development costs, (3) fluid purchase costs, and (4) well field and power plant operation and maintenance costs. The total cost of power generated from the Heber Plant (in terms of mills per kWh) is then compared to the cost of power from alternative fossil-fueled base load units. Also evaluated are the provisions of both: (a) the Cooperative Agreement between the federal government and San Diego Gas and Electric (SDG and E); and (b) the Geothermal Heat Sales Contract with Union Oil Company.

Cassel, T.A.V.; Amundsen, C.B.; Blair, P.D.

1983-06-30T23:59:59.000Z

348

Indian River Hydroelectric Project Grant  

SciTech Connect (OSTI)

This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

Rebecca Garrett

2005-04-29T23:59:59.000Z

349

Waste management project technical baseline description  

SciTech Connect (OSTI)

A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

Sederburg, J.P.

1997-08-13T23:59:59.000Z

350

Socioeconomic effects of DRAFT power marketing options of the Central Valley and Washoe Projects: 2005 regional economic impact analysis using IMPLAN  

SciTech Connect (OSTI)

This report summarizes the methods and conclusions of an economic analysis of the distributional effects of alternative actions that Sierra Nevada could take with its new marketing plan. These alternatives are summarized in the agency`s Environmental Impact Statement (EIS), and this study directly supports the findings in the EIS. The study evaluates the potential economic impacts projected to occur across the northern and central California area currently serviced by Sierra Nevada`s customers. A standard input-output estimation approach was used to calculate impacts on regional output, labor income, and employment. The IMPLAN regional economic modeling system was used to develop regional models for the analysis. Individual regional models were developed for the overall area, the San Francisco Consolidated Metropolitan Statistical Area, the Sacramento Consolidated Metropolitan Statistical Area, the Redding Metropolitan Statistical Area, and the Bakersfield Metropolitan Statistical Area. The analysis relies on information about the effect of Sierra Nevada`s alternative actions on overall system power costs for the year 2005 developed by RW Beck and Associates (Beck-1996). This information is used as input to the 2005 benchmarked IMPLAN regional economic models. The resulting economic impact estimates are inextricably linked to this input information about changes in system power costs, and the estimates reported here are of similar relative magnitude to those estimates. The potential economic effects of Sierra Nevada`s actions are extremely small in relation to the size of the economies potentially affected, and, although they are calculable, they are not significant and often difficult to separate from random error present in the models.

Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

1996-04-01T23:59:59.000Z

351

Interns for Indiana (IFI) Project descriptions  

E-Print Network [OSTI]

with the company after graduation, which allows him to work on cutting edge projects, aid in company growthInterns for Indiana (IFI) Projects Project descriptions: · Software development, database design analysis Past student project Development of animated graphics for web portal and product demos -Kevin

352

Stability evaluation of the Markel Mine at Weeks Island, Louisiana  

SciTech Connect (OSTI)

A three dimensional (3D) finite element analysis of the Markel Mine located on Weeks Island was performed to: (1) evaluate the stability of the mine and (2) determine the effect of mine failure on the nearby Morton Salt mine and SPR facilities. The first part of the stability evaluation investigates the effect of pillar failure on mine stability. These simulations revealed that tensile stresses and dilatant damage develop in the overlying salt as a result of pillar loss. These tensile stresses extend to the salt/overburden interface only for the case where all 45 of the pillars are assumed to fail. Tensile stresses would likely cause microfracturing of the salt, resulting in a flow path for groundwater from the overlying aquifer to enter the mine. The dilatant damage bridges between the mine and the overburden in the case where 15 or more pillars are removed from the model. Dilatant damage is attributed to microfracturing or changes in the pore structure of the salt and could also result in a flow path for groundwater to enter the mine. The second part of the Markel Mine evaluation investigates the stability of the pillars with respect to three failure mechanisms: tensile failure, compressive failure, and creep rupture. A 3D slabbing pillar model of the Markel mine was developed to investigate progressive failure of the pillars and the effect of slabbing on mine stability. Based on a strain-limiting creep rupture criterion, pillar failure is predicted to be extensive at present. The associated loss of pillar strength should be equivalent to removing all pillars from the model as was done in the first part of this stability analysis, resulting in the possibility of ground water intrusion. Since creep rupture is not a well understood phenomenon, further development and validation of this criterion is recommended.

Hoffman, E.L.

1994-06-01T23:59:59.000Z

353

University of Calgary -Schulich School of Engineering Project 3 -Week Lookahead  

E-Print Network [OSTI]

Install Sheet Metal A202Z 12 A211W Demo & Rough In 13 Siemens Rough-In & Wire Pull Corridor lvl 3 14 Siemens Rough-In & Wire Pull Corridor lvl 2 15 Siemens Rough-In & Wire Pull Corridor lvl 1 16 Siemens Rough-In & Wire Pull Basement 17 Siemens Rough-In Corridor Sub Basement 18 Siemens Rough-In Riser lvl

Calgary, University of

354

University of Calgary -Schulich School of Engineering Project 3 -Week Lookahead  

E-Print Network [OSTI]

-insulate elbows Basement 12 West Glass Re-insulate elbows Sub Bsmnt 13 Siemens Rough-In Corridor lvl 2 14 Siemens Rough-In Corridor lvl 1 15 Siemens Rough-In Basement 16 Siemens Rough-In Sub Basement 17 Siemens Rough sheet metal in corridors 21 Prep for MCC & VFD 22 Siemens Demo & Rough-In A01V 23 Install MCC & VFD 24

Calgary, University of

355

University of Calgary -Schulich School of Engineering Project 3 -Week Lookahead  

E-Print Network [OSTI]

& Rough In 13 Siemens Rough-In & Wire Pull Corridor lvl 3 14 Siemens Rough-In & Wire Pull Corridor lvl 2 15 Siemens Rough-In & Wire Pull Corridor lvl 1 16 Siemens Rough-In & Wire Pull Basement 17 Siemens Rough-In Corridor Sub Basement 18 Siemens Rough-In Riser lvl Sub Bsmnt-lvl 3 20 Siemens Demo & Rough

Calgary, University of

356

University of Calgary -Schulich School of Engineering Project 3 -Week Lookahead  

E-Print Network [OSTI]

Sheet Metal A11,11c,13,129,131,103,101a 10 Siemens Rough-In & Wire Pull Corridor lvl 3 11 Siemens Rough-In & Wire Pull Corridor lvl 2 12 Siemens Rough-In & Wire Pull Corridor lvl 1 13 Siemens Rough-In & Wire Pull Basement 14 Siemens Rough-In Sub Basement 15 Siemens Rough-In Riser lvl Sub Bsmnt-lvl 3 16 Electrical Rough

Calgary, University of

357

University of Calgary -Schulich School of Engineering Project 3 -Week Lookahead  

E-Print Network [OSTI]

A211W Demo & Rough In 13 Siemens Rough-In & Wire Pull Corridor lvl 1 15 Siemens Rough-In & Wire Pull Basement 16 Siemens Rough-In Corridor Sub Basement 17 Siemens Rough-In Riser lvl Sub Bsmnt-lvl 3 18 MCC #7 Metal Basement 44 Siemens Rough in & Wire Pull Corridor lvl 1 45 Siemens Rough-In & Wire Pull Corridor

Calgary, University of

358

University of Calgary -Schulich School of Engineering Project 3 -Week Lookahead  

E-Print Network [OSTI]

/ Drywall 8 Siemens Commissioning Bsmnt-lvl 3 9 Siemens Rough-In Corridor Sub Basement 10 Siemens Rough-In Riser lvl Sub Bsmnt-lvl 3 11 Siemens Rough-in A107 & A103 12 Spectra Fans Change out parts on AHU's 13 lvl 2 25 Siemens Rough-In & Wire Pull Corridor basement 26 Siemens Rough-In Corridor Sub-Basement 27

Calgary, University of

359

University of Calgary -Schulich School of Engineering Project 3 -Week Lookahead  

E-Print Network [OSTI]

-insulate elbows lvl 2 West Glass Re-insulate elbows lvl 1 Siemens Rough-In Corridor lvl 3 Siemens Rough-In Corridor lvl 2 Siemens Rough-In Corridor lvl 1 Siemens Rough-In Riser B104V West Glass Re-insulate elbows Investigation of sheet metal cooridor & W/C W/C & Corridor rough-in shet metal lvl 1-3 Siemens Rough-In Corridor

Calgary, University of

360

Smart Grid Week: New Project in Oregon Helping Advance the Grid of the  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles »ExchangeDepartmentResolveFuture | Department of Energy New

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

ARPA-E Announces 13 New Projects at New York Energy Week | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartment of Energy 601 High IntegrityEnergy ( ARI )CheaperEnergy 13

362

Solar Loan Week: Conditional Loan for Arizona Solar Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research |RegulationRenewable Energy (EERE)SmartRemarkson solar energyDr.ofEnergy

363

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

SciTech Connect (OSTI)

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

2012-01-01T23:59:59.000Z

364

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

365

Welcome to #GridWeek on Energy.gov | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe House Committee onsupports high impact projectsMatt8Use #GridWeek on social

366

EERE PROJECT MANAGEMENT CENTER NFPA DETFIU.fiNATION  

Broader source: Energy.gov (indexed) [DOE]

standards and sample analysis); small-scale research and development projects: and small-scale pilot projects (generally less than two years) conducted to verify a concept...

367

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

368

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

369

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

370

HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT DYTRAN BENCHMARK ANALYSIS OF SEISMICALLY INDUCED FLUID STRUCTURE INTERACTION IN FLAT TOP TANKS  

SciTech Connect (OSTI)

The work reported in this document was performed in support of a project entitled ''Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Analyses''. The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST System at Hanford. The work described herein was performed in support of the seismic analysis of the DSTs. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). The work herein was motivated by review comments from a Project Review Meeting held on March 20-21, 2006. One of the recommendations from that meeting was that the effects of the interaction between the tank liquid and the roof be further studied (Rinker, Deibler, Johnson, Karri, Pilli, Abatt, Carpenter, and Hendrix - Appendix E of RPP-RPT-28968, Rev. 1). The reviewers recommended that solutions be obtained for seismic excitation of flat roof tanks containing liquid with varying headspace between the top of the liquid and the tank roof. It was recommended that the solutions be compared with simple, approximate procedures described in BNL (1995) and Malhotra (2005). This report documents the results of the requested studies and compares the predictions of Dytran simulations to the approximate procedures in BNL (1995) and Malhotra (2005) for flat roof tanks. The four cases analyzed all employed a rigid circular cylindrical flat top tank with a radius of 450 in. and a height of 500 in. The initial liquid levels in the tank were 460,480,490, and 500 in. For the given tank geometry and the selected seismic input, the maximum unconstrained slosh height of the liquid is slightly greater than 25 in. Thus, the initial liquid level of 460 in. represents an effectively roofless tank, the two intermediate liquid levels lead to intermittent interaction between the liquid and tank roof, and the 500 in. liquid level represents a completely full tank with no sloshing. Although this work was performed in support of the seismic analysis of the Hanford DSTs, the tank models in this study are for an idealized flat top configuration. Moreover, the liquid levels used in the present models are for study purposes only and are independent of the actual operating levels of the DSTs. The response parameters that are evaluated in this study are the total hydrodynamic reaction forces, the peak convective hydrodynamic forces, the fundamental convective frequencies, the liquid pressures, and peak slosh heights. The results show that the Dytran solutions agree well with the known solutions for the roofless tank and completely full tank. At the two intermediate liquid levels, there are some significant differences between the Dytran results and the approximate estimates. The results show that the estimates of peak hydrodynamic reaction forces appearing in BNL (1995) and Malhotra (2005) are reasonable and generally conservative relative to the Dytran solutions. At the 460 and 480 in. liquid levels, Dytran underestimates the convective component of the reaction force compared to the estimated in BNL (1995) and Malhotra (2005), but the convective component of the reaction force is small relative to the total reaction force. At the 490 in. liquid levels, the peak convective reaction force is more than twice as large as predicted by the approximate methods in BNL (1995) and Malhotra (2005). All three methods give similar answers for the fundamental convective frequency at the 460 and 480 in. liquid levels, but the Dytran solution indicates a significant increase in the apparent convective frequency at the 490 in. liquid level that is caused by the interaction with the roof. The peak wall pressures in the tank at the two intermediate liquid levels are essentially the same as for a roofless tank in the lower two-thirds of the tank wall, but diverge from that solution in the upper third of the tank wall. The estimates of peak wall pressures appearing in BNL (1995) are quite conservative lower in the tank, but may underestimate the peak wall pressures closer to the tank roof. Finally, the peak roof pre

MACKEY, T.C.

2007-02-16T23:59:59.000Z

371

PPPL's Earth Week features Colloquium on NYC green plan, cleanup...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PPPL's Earth Week features Colloquium on NYC green plan, cleanup and awards By Jeanne Jackson DeVoe April 28, 2014 Tweet Widget Google Plus One Share on Facebook Volunteers clean...

372

Photo of the Week: June 29, 2012 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

of the Week: June 29, 2012 June 29, 2012 - 4:06pm Addthis This slice can help sequester carbon. The x-ray microtomography image shows a slice of biofilm grown on a porous hollow...

374

Natural Gas Storage Report, Weekly EIA-AGA Comparison  

Reports and Publications (EIA)

This report is intended to aid data users by examining differences between the Energy Information Administration and American Gas Association weekly surveys and comparing the results of the two surveys for the brief period of time in which they overlapped.

2002-01-01T23:59:59.000Z

375

Careers in Energy Week, Oct. 15-21  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 12 FOR IMMEDIATE RELEASE Bonneville Power Administration Thursday, Oct. 11, 2012 CONTACT: Kevin Wingert, BPA, 503-230-4145 or 503-230-5131 Careers in Energy Week, Oct. 15-21,...

376

Question of the Week: Do Energy-Related Financial Incentives...  

Broader source: Energy.gov (indexed) [DOE]

Do Energy-Related Financial Incentives Prompt You to Be More Energy Efficient? Question of the Week: Do Energy-Related Financial Incentives Prompt You to Be More Energy Efficient?...

377

Question of the Week: How Does Your Community Encourage Energy...  

Broader source: Energy.gov (indexed) [DOE]

sumer.webmaster@nrel.gov. Addthis Related Articles Question of the Week: How Will You Landscape for Energy Efficiency? What Steps Do You Take to Improve Your Fuel Economy? How Are...

378

VEHICLE USAGE LOG Department ________________________________________ Vehicle Homebase ____________________________ Week Ended (Sunday) _________________  

E-Print Network [OSTI]

VEHICLE USAGE LOG Department ________________________________________ Vehicle Homebase ____________________________ Week Ended (Sunday) _________________ Door #____________ License Plate ____________________ Vehicle/Supplies (Enter Description such as grade sheets, artifacts, money, etc.) 6. Taking vehicle to Automotive Shop

Yang, Zong-Liang

379

Photo of the Week: Controlling Chaos with Magnetic Fields | Department...  

Broader source: Energy.gov (indexed) [DOE]

Multimedia Editor, Office of Public Affairs Every week, we'll feature our favorite energy-related photo here on Energy.gov, at Facebook.comEnergygov, on Twitter via @ENERGY...

380

Problems Of The Week Due March 26th  

E-Print Network [OSTI]

Problems Of The Week Due March 26th Make sure to review the guidelines before you start! You can triangle are whole numbers. The perimeter of the triangle is 110 inches and one side has measure 29 inches

Bigelow, Stephen

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Photo of the Week: Women in STEM -- Elaine Zworykin | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Every week, we'll feature our favorite energy-related photo here on Energy.gov, at Facebook.comEnergygov, on Twitter via @ENERGY and on our Flickr photostream. For other photos...

382

UC Energy Week 2010 May 10-12, 2010  

E-Print Network [OSTI]

UC Energy Week 2010 May 10-12, 2010 Inventing a New Energy Future Biomass Energy Geothermal Energy Solar Energy Wind Energy & Integrated Renewables InventIng a new energy Future UC EnErgy WEEk 2010 May 10­12, 2010 rgy intEgratEd rEnEWaBlEs Biomass EnErgy gEothErmal En nErgy gEothErmal EnErgy

383

EFFECTS OF ONE WEEK TRITIUM EXPOSURE ON EPDM ELASTOMER  

SciTech Connect (OSTI)

This report documents test results for the exposure of four formulations of EPDM (ethylene-propylene diene monomer) elastomer to tritium gas at one atmosphere for approximately one week and characterization of material property changes and changes to the exposure gas during exposure. All EPDM samples were provided by Los Alamos National Laboratory (LANL). Material properties that were characterized include mass, sample dimensions, appearance, flexibility, and dynamic mechanical properties. The glass transition temperature was determined by analysis of the dynamic mechanical property data per ASTM standards. No change of glass transition temperature due to the short tritium gas exposure was observed. Filled and unfilled formulations of Dupont{reg_sign} Nordel{trademark} 1440 had a slightly higher glass transition temperature than filled and unfilled formulations of Uniroyal{reg_sign} Royalene{reg_sign} 580H; filled formulations had the same glass transition as unfilled. The exposed samples appeared the same as before exposure--there was no evidence of discoloration, and no residue on stainless steel spacers contacting the samples during exposure was observed. The exposed samples remained flexible--all formulations passed a break test without failing. The unique properties of polymers make them ideal for certain components in gas handling systems. Specifically, the resiliency of elastomers is ideal for sealing surfaces, for example in valves. EPDM, initially developed in the 1960s, is a hydrocarbon polymer used extensively for sealing applications. EPDM is used for its excellent combination of properties including high/low-temperature resistance, radiation resistance, aging resistance, and good mechanical properties. This report summarizes initial work to characterize effects of tritium gas exposure on samples of four types of EPDM elastomer: graphite filled and unfilled formulations of Nordel{trademark} 1440 and Royalene{reg_sign} 580H.

Clark, E

2007-06-07T23:59:59.000Z

384

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

385

Strategic Analysis and Modeling  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

analysis Conceptual Process Design Material and Energy Balance Capital and Project Cost Estimates Environmental Sustainability Analysis R&D DOE Goals Economic Analysis...

386

Arnold Schwarzenegger INTERMITTENCY ANALYSIS PROJECT  

E-Print Network [OSTI]

the Tehachapi, Imperial, Western Electricity Coordinating Council (WECC) and Frontier Line working groups

387

Project Report Dependence Cluster Analysis  

E-Print Network [OSTI]

, particularly Fayezin Islam and Ashraful Hassan who have given their thoughtful insight, ideas about 90% of the program. These programs contained a total of 320 global variables which were

Singer, Jeremy

388

Project Analysis Standard Operating Procedure  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | Department ofThatGrid3 Program Update: 4thDecemberand

389

2010 oil spill: trajectory projections based on ensemble drifter analyses  

E-Print Network [OSTI]

2010 oil spill: trajectory projections based on ensemble drifter analyses Yu-Lin Chang & Leo Oey # Springer-Verlag 2011 Abstract An accurate method for long-term (weeks to months) projections of oil spill released at the northern Gulf of Mexico spill site is demonstrated during the 2010 oil spill

390

HANFORD DOUBLE-SHELL TANK THERMAL AND SEISMIC PROJECT DYTRAN BENCHMARK ANALYSIS OF SEISMICALLY INDUCED FLUID-STRUCTURE INTERACTION IN FLAT-TOP TANKS  

SciTech Connect (OSTI)

Rev 1 of this report provides corrections and clarifications in response to reviewer comments arising during a project review meeting held June 7-8, 2007.

MACKEY TC; ABATT FG; RINKER MW

2009-08-18T23:59:59.000Z

391

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

392

CNS-ProjectManagement-Guidelines-200010.doc 1 / 3 CNS Project Management Procedures and Guidelines  

E-Print Network [OSTI]

CNS-ProjectManagement-Guidelines-200010.doc 1 / 3 CNS Project Management Procedures and Guidelines (Rev. October 2000) Staffing and Project Management This section is intended to provide business an application. Following an analysis phase, which may be performed by CNS in collaboration with the project

Shihadeh, Alan

393

NREL: Energy Analysis: Analysis of Project Finance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions and Achievements ofLiz Torres Photo ofTravis LowderWesley Cole

394

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

395

Winter fuels report, week ending December 14, 1990. [Contains glossary  

SciTech Connect (OSTI)

This report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and state and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on a US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD) I, II, and III; natural gas supply and disposition and underground storage for the United States and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those states participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the United States and selected cities; and US total heating degree-days by city. This report will be published weekly by the EIA starting the first week in October 1990 and will continue until the first week in April 1991. 34 figs., 12 tabs.

Not Available

1990-12-20T23:59:59.000Z

396

Winter fuels report, week ending December 7, 1990. [Contains glossary  

SciTech Connect (OSTI)

The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and state and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on a US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD) I, II, and III; natural gas supply and disposition and underground storage for the United States and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those states participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the United States and selected cities; and US total heating degree-days by city. This report will be published weekly by the EIA starting the first week in October 1990 and will continue until the first week in April 1991. 27 figs., 12 tabs.

Not Available

1990-12-13T23:59:59.000Z

397

Winter fuels report, week ending November 30, 1990. [Contains Glossary  

SciTech Connect (OSTI)

The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and state and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on a US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD) I, II, and III; natural gas supply and disposition and underground storage for the United States and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those states participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the United States and selected cites; and US total heating degree-days by city. This report will be published weekly by the EIA starting the first week in October 1990 and will continue until the first week in April 1991. 27 figs., 12 tabs.

Not Available

1990-12-06T23:59:59.000Z

398

GRADUATE STUDENT COURSE ASSIGNMENTS Block 1 Discrete mathematics ---Babai Weeks 18  

E-Print Network [OSTI]

Products on spaces --- Angeltveit Weeks 5­8 Block 6 Number Theory (Apprentice) --- Babai Weeks 1*­4 Week 1, Guillou, Johnson, Lind Block 4b (Angeltveit) (weeks 5­8) Bohmann, Johnson, Lind Block 5 (Apprentice by block and by mentoring group Name (28) weeks Block Mentoring Alan Anders 8 3b, 3c Apprentice Sundeep

May, J. Peter

399

2020 Vision Project Summary  

SciTech Connect (OSTI)

Since the 2020 Vision project began in 1996, students from participating schools have completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on US national security. This report summarizes the students' views and describes trends observed over the course of the 2020 Vision project's five years. It also highlights the main organizational features of the project. An analysis of thematic trends among the scenarios showed interesting shifts in students' thinking, particularly in their views of computer technology, US relations with China, and globalization. In 1996, most students perceived computer technology as highly beneficial to society, but as the year 2000 approached, this technology was viewed with fear and suspicion, even personified as a malicious, uncontrollable being. Yet, after New Year's passed with little disruption, students generally again perceived computer technology as beneficial. Also in 1996, students tended to see US relations with China as potentially positive, with economic interaction proving favorable to both countries. By 2000, this view had transformed into a perception of China emerging as the US' main rival and ''enemy'' in the global geopolitical realm. Regarding globalization, students in the first two years of the project tended to perceive world events as dependent on US action. However, by the end of the project, they saw the US as having little control over world events and therefore, we Americans would need to cooperate and compromise with other nations in order to maintain our own well-being.

Gordon, K.W.; Scott, K.P.

2000-11-01T23:59:59.000Z

400

Radiation Embrittlement Archive Project  

SciTech Connect (OSTI)

The Radiation Embrittlement Archive Project (REAP), which is being conducted by the Probabilistic Integrity Safety Assessment (PISA) Program at Oak Ridge National Laboratory under funding from the U.S. Nuclear Regulatory Commission s (NRC) Office of Nuclear Regulatory Research, aims to provide an archival source of information about the effect of neutron radiation on the properties of reactor pressure vessel (RPV) steels. Specifically, this project is an effort to create an Internet-accessible RPV steel embrittlement database. The project s website, https://reap.ornl.gov, provides information in two forms: (1) a document archive with surveillance capsule(s) reports and related technical reports, in PDF format, for the 104 commercial nuclear power plants (NPPs) in the United States, with similar reports from other countries; and (2) a relational database archive with detailed information extracted from the reports. The REAP project focuses on data collected from surveillance capsule programs for light-water moderated, nuclear power reactor vessels operated in the United States, including data on Charpy V-notch energy testing results, tensile properties, composition, exposure temperatures, neutron flux (rate of irradiation damage), and fluence, (Fast Neutron Fluence a cumulative measure of irradiation for E>1 MeV). Additionally, REAP contains data from surveillance programs conducted in other countries. REAP is presently being extended to focus on embrittlement data analysis, as well. This paper summarizes the current status of the REAP database and highlights opportunities to access the data and to participate in the project.

Klasky, Hilda B [ORNL] [ORNL; Bass, Bennett Richard [ORNL] [ORNL; Williams, Paul T [ORNL] [ORNL; Phillips, Rick [ORNL] [ORNL; Erickson, Marjorie A [ORNL] [ORNL; Kirk, Mark T [ORNL] [ORNL; Stevens, Gary L [ORNL] [ORNL

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

402

HEFF---A user`s manual and guide for the HEFF code for thermal-mechanical analysis using the boundary-element method; Version 4.1: Yucca Mountain Site Characterization Project  

SciTech Connect (OSTI)

The HEFF Code combines a simple boundary-element method of stress analysis with the closed form solutions for constant or exponentially decaying heat sources in an infinite elastic body to obtain an approximate method for analysis of underground excavations in a rock mass with heat generation. This manual describes the theoretical basis for the code, the code structure, model preparation, and step taken to assure that the code correctly performs its intended functions. The material contained within the report addresses the Software Quality Assurance Requirements for the Yucca Mountain Site Characterization Project. 13 refs., 26 figs., 14 tabs.

St. John, C.M.; Sanjeevan, K. [Agapito (J.F.T.) and Associates, Inc., Grand Junction, CO (United States)

1991-12-01T23:59:59.000Z

403

New Songdo City and the value of flexibility : a case study of implementation and analysis of a mega-scale project  

E-Print Network [OSTI]

In the modern real estate industry, mega-scale developments have been a notable feature. The distinctiveness of these projects is that they are enormous in scale and thus require many years to develop. Unlike regular sized ...

Lee, Junho (Junho Justin)

2008-01-01T23:59:59.000Z

404

FINAL REPORT ARIZONA WATER INSTITUTE PROJECT  

E-Print Network [OSTI]

1-17-08 FINAL REPORT ARIZONA WATER INSTITUTE PROJECT "ARIZONA TRIBAL APPROACHES TO WATER of Arizona. The project, "Arizona Tribal Approaches to Water Management," focused OIl developing research and analysis to support tribal water resources management. The project workplan included development of a core

Fay, Noah

405

ATOC 3500/CHEM 3151 -Week 10 Urban Pollution  

E-Print Network [OSTI]

ATOC 3500/CHEM 3151 - Week 10 Urban Pollution Back to the troposphere (Chapters 3, 8 and 11) (Where #12;Health and welfare effects of air pollution (p 206-211) · Pollution episodes, Cause and effect relationships · Human body · Health effects of regulated pollutants · Personal air pollution (smoking) · Risk

Toohey, Darin W.

406

YEAR PALAEOMAGNETISM OPTION 5TH WEEK ENVIRONMENTAL MAGNETISM  

E-Print Network [OSTI]

4TH YEAR ­ PALAEOMAGNETISM OPTION ­ 5TH WEEK ­ ENVIRONMENTAL MAGNETISM Questions to be investigated: 1. What is environmental magnetism? 2. What rock magnetic parameters are used in environmental magnetism? 3. What geologic parameters are contributing to the environmental magnetic signals? 4. How can we

Niocaill, Conall Mac

407

National propane safety week caps fifth anniversary of GAS Check  

SciTech Connect (OSTI)

This paper reports on National Propane Safety Week. The publicity encompassed everything from preventative maintenance to safe winter storage of cylinders. This campaign focused much of its attention on GAS (gas appliance system) Check, the propane industry's most well-known safety program.

Prowler, S.

1990-09-01T23:59:59.000Z

408

Next Story > SC DMV lifting drivers' suspensions this week  

E-Print Network [OSTI]

The State Next Story > SC DMV lifting drivers' suspensions this week Researcher: Zombie fads peak COLUMBIA, S.C. -- Zombies seem to be everywhere these days. In the popular TV series "The Walking Dead at the University of California at Davis. Lauro said she keeps track of zombie movies, TV shows and video games

Duchowski, Andrew T.

409

ORNL Lightweighting Research Featured on MotorWeek  

ScienceCinema (OSTI)

PBS MotorWeek, television's longest running automotive series, featured ORNL lightweighting research for vehicle applications in an episode that aired in early April 2014. The crew captured footage of research including development of new metal alloys, additive manufacturing, carbon fiber production, advanced batteries, power electronics components, and neutron imaging applications for materials evaluation.

None

2014-06-03T23:59:59.000Z

410

MAE 124/ESYS 103 Discussion: Week 7 Transportation Alternatives  

E-Print Network [OSTI]

MAE 124/ESYS 103 Discussion: Week 7 Transportation Alternatives 0. San Diego government routes. And today is Bike to Work Day. Let's take a Life Cycle Assessment approach to transportation planning? What steps do we need to pursue? 1. Why does SANDAG care about transportation? Why does UCSD

Gille, Sarah T.

411

ORNL Lightweighting Research Featured on MotorWeek  

SciTech Connect (OSTI)

PBS MotorWeek, television's longest running automotive series, featured ORNL lightweighting research for vehicle applications in an episode that aired in early April 2014. The crew captured footage of research including development of new metal alloys, additive manufacturing, carbon fiber production, advanced batteries, power electronics components, and neutron imaging applications for materials evaluation.

None

2014-04-15T23:59:59.000Z

412

National Chemistry Week Theme: "Candy: The Sweet Side of Chemistry"  

E-Print Network [OSTI]

National Chemistry Week Theme: "Candy: The Sweet Side of Chemistry" Super Science Saturday Saturday-on chemistry and science demonstrations! All students & families are welcome! Fun & educational for all ages! Sponsored by: American Chemical Society LSU Department of Chemistry LSU Athletic Department Free admission

Stephens, Jacqueline

413

Northern Michigan FruitNet 2005 Weekly Update  

E-Print Network [OSTI]

Ethephon on Cherries Jim Nugent, District Horticulturist, MSUE Heat, drought stress, lack of uniform a little easier. Included in this report is an article written a couple weeks ago on ethephon that we used with ethephon due to limited tree canopy. So far, it appears that fruit removal force on sweet cherries is lower

414

Weekly Disambiguations of US Patent Grants and Applications Gabe Fierro  

E-Print Network [OSTI]

Weekly Disambiguations of US Patent Grants and Applications Gabe Fierro Benjamin Balsmeie Guan patent data. The tools disambiguate inventor, assignee, law rm, and location names mentioned on each granted US patent since 1975 and all applications since 2001. While parts of this rst version are crude

Sekhon, Jasjeet S.

415

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

analysis. That growth in renewable energy generation maypurchasing renewable energy or RECs. Load growth: Reflects

Chen, Cliff

2009-01-01T23:59:59.000Z

416

NATURAL CONVECTION IN PASSIVE SOLAR BUILDINGS: EXPERIMENTS, ANALYSIS AND RESULTS  

E-Print Network [OSTI]

SOLAR BUILDINGS: ANALYSIS AND RESULTS Ashok Gadgil, Fred Bauman, and Ronald Kammerud April 1981 TWO-WEEK LOAN

Gadgil, Ashok; Bauman, Fred; Kammerud, Ronald

2008-01-01T23:59:59.000Z

417

Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects  

SciTech Connect (OSTI)

This report is the third in a series of reports sponsored by the U.S. Department of Energy Geothermal Technologies Program in which a range of water-related issues surrounding geothermal power production are evaluated. The first report made an initial attempt at quantifying the life cycle fresh water requirements of geothermal power-generating systems and explored operational and environmental concerns related to the geochemical composition of geothermal fluids. The initial analysis of life cycle fresh water consumption of geothermal power-generating systems identified that operational water requirements consumed the vast majority of water across the life cycle. However, it relied upon limited operational water consumption data and did not account for belowground operational losses for enhanced geothermal systems (EGSs). A second report presented an initial assessment of fresh water demand for future growth in utility-scale geothermal power generation. The current analysis builds upon this work to improve life cycle fresh water consumption estimates and incorporates regional water availability into the resource assessment to improve the identification of areas where future growth in geothermal electricity generation may encounter water challenges. This report is divided into nine chapters. Chapter 1 gives the background of the project and its purpose, which is to assess the water consumption of geothermal technologies and identify areas where water availability may present a challenge to utility-scale geothermal development. Water consumption refers to the water that is withdrawn from a resource such as a river, lake, or nongeothermal aquifer that is not returned to that resource. The geothermal electricity generation technologies evaluated in this study include conventional hydrothermal flash and binary systems, as well as EGSs that rely on engineering a productive reservoir where heat exists, but where water availability or permeability may be limited. Chapter 2 describes the approach and methods for this work and identifies the four power plant scenarios evaluated: a 20-MW EGS binary plant, a 50-MW EGS binary plant, a 10-MW hydrothermal binary plant, and a 50-MW hydrothermal flash plant. The methods focus on (1) the collection of data to improve estimation of EGS stimulation volumes, aboveground operational consumption for all geothermal technologies, and belowground operational consumption for EGS; and (2) the mapping of the geothermal and water resources of the western United States to assist in the identification of potential water challenges to geothermal growth. Chapters 3 and 4 present the water requirements for the power plant life cycle. Chapter 3 presents the results of the current data collection effort, and Chapter 4 presents the normalized volume of fresh water consumed at each life cycle stage per lifetime energy output for the power plant scenarios evaluated. Over the life cycle of a geothermal power plant, from construction through 30 years of operation, the majority of water is consumed by plant operations. For the EGS binary scenarios, where dry cooling was assumed, belowground operational water loss is the greatest contributor depending upon the physical and operational conditions of the reservoir. Total life cycle water consumption requirements for air-cooled EGS binary scenarios vary between 0.22 and 1.85 gal/kWh, depending upon the extent of belowground operational water consumption. The air-cooled hydrothermal binary and flash plants experience far less fresh water consumption over the life cycle, at 0.04 gal/kWh. Fresh water requirements associated with air- cooled binary operations are primarily from aboveground water needs, including dust control, maintenance, and domestic use. Although wet-cooled hydrothermal flash systems require water for cooling, these plants generally rely upon the geofluid, fluid from the geothermal reservoir, which typically has high salinity and total dissolved solids concentration and is much warmer than normal groundwater sources, for their cooling water needs; thus,

Clark, Corrie E. [Environmental Science Division] [Environmental Science Division; Harto, Christopher B. [Environmental Science Division] [Environmental Science Division; Schroeder, Jenna N. [Environmental Science Division] [Environmental Science Division; Martino, Louis E. [Environmental Science Division] [Environmental Science Division; Horner, Robert M. [Environmental Science Division] [Environmental Science Division

2013-11-05T23:59:59.000Z

418

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

419

PROJECT SUMMARY  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT

420

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FYCurtailment DateCustom-Projects

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project Gnome  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject CostEnergy

422

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

423

Project Management Practices  

Energy Savers [EERE]

on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

424

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

425

Administrative Excellence Shaping Our Future Phase II Work Team Project Charter  

E-Print Network [OSTI]

and analysis, and review of current policies and operations to support and enhance scientific supplies or desired policies; conduct analysis and build business case content · Weeks 7 to 8 ­ Discuss business case and implementation plan; conduct additional analysis as required · Weeks 9 to 10 ­Finalize business case

Sheridan, Jennifer

426

Health-hazard evaluation report HETA 88-391-2156, Morton Salt Company, Weeks Island, Louisiana  

SciTech Connect (OSTI)

In response to a request from the International Chemical Workers Union, project director, an evaluation was undertaken of possible hazardous working conditions at the Morton Salt Company (SIC-1479), Weeks Island, Louisiana. At Weeks Island the salt was mined from large domes, circular in shape and from a few hundred yards to a mile across. The only detectable overexposures in the mining operation were to coal-tar pitch volatiles. None of the 20 personal breathing zone and area air samples collected in the mill were above detectable limits for asbestos (1332214). The prevalences of chronic cough and chronic phlegm reported were statistically different, exceeding those reported by a group of nonexposed blue collar workers. Chronic symptoms were reported by underground workers in all smoking categories, but only by those surface workers who also smoked. There were more complaints about eye irritation and tearing of the eyes in the underground workers, consistent with diesel byproduct exposure. Four workers were identified through pulmonary function test results with mild obstructive lung disease and one with moderate obstructive lung disease. Three workers with mild restriction of lung volume were noted. None of the 61 chest films taken read positively for pneumoconiosis. The authors conclude that overexposures to coal-tar pitch volatiles existed at the time of the survey. The authors recommend measures for reducing occupational exposures to workplace contaminants. A follow up medical questionnaire survey should be conducted.

Ferguson, R.P.; Knutti, E.B.

1991-11-01T23:59:59.000Z

427

The Araucaria Project  

E-Print Network [OSTI]

{Results from a long-term observational project called the Araucaria Project are presented. Based on Wide Field optical monitoring of 8 nearby galaxies, covering a large range of metallicities, more than 500 Cepheids and a few hundred Blue Supergiant candidates were identified. From the analysis of Cepheid P-L relations of outstanding quality derived from our data we conclude that the slope of these relations in the I band and Wesenheit index are not dependent on metallicity. Comparing the I-band magnitudes of Cepheids of a period of ten days, as computed from our P-L relations, to the I-band magnitudes of the tip of the RGB, which is widely believed to be independent of population effects, we cannot see any obvious dependence of the zero point of the I-band P-L relation on metallicity. A preliminary analysis of IR follow-up observations of sub-samples of the identified Cepheids in various galaxies of the project show that the distances obtained from these data are systematically shorter by about of 0.1 mag than those derived from the optical photometry. It is likely that this effect can be attributed to the internal reddening in the program galaxies.

G. Pietrzynski; W. Gieren

2005-09-22T23:59:59.000Z

428

NREL Smart Grid Projects  

SciTech Connect (OSTI)

Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

Hambrick, J.

2012-01-01T23:59:59.000Z

429

Winter fuels report, week ending December 28, 1990. [Contains glossary  

SciTech Connect (OSTI)

This report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and State and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on a US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD), I, II, and III; natural gas supply and disposition and underground storage for the United States and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those States participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the United States and selected cities; and US total heating degree-days by city. This report will published weekly by the EIA starting the first week in October 1990 and will continue until the first week in April 1991. The data will also be electronically after 5:00 p.m. on Thursday during the heating season through the EIA Electronic Publication System (EPUB). 34 figs., 12 tabs.

Not Available

1991-01-04T23:59:59.000Z

430

Winter fuels report: Week ending October 19, 1990  

SciTech Connect (OSTI)

The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and state and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on the US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD) I, II, and III; natural gas supply and disposition and underground storage for the United States and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those states participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the United States and selected cities; and US total heating degree-days by city. This report will be published weekly by the EIA starting the first week in October 1990 and will continue until the first week in April 1991. The data will also be available electronically after 5:00 pm on Thursday during the heating season through the EIA Electronic Publication System (EPUB).

Not Available

1990-10-25T23:59:59.000Z

431

Winter fuels report, week ending December 21, 1990. [Contains glossary  

SciTech Connect (OSTI)

The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and State and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on a US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD), I, II, and III; natural gas supply and disposition and underground storage for the United States and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those States participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the United States and selected cities; and US total heating degree-days by city. This report will be published weekly by the EIA starting the first week in October 1990 and will continue until the first week in April 1991. The data will also be available electronically after 5:00 p.m. on Thursday during the heating season through the EIA Electronic Publication System (EPUB). 34 figs., 12 tabs.

Not Available

1990-12-28T23:59:59.000Z

432

Winter fuels report, week ending October 20, 1995  

SciTech Connect (OSTI)

Weekly estimates of distillate stocks (131.6 MMB) are now 2.1 MMB below the lower bound of the three year average, and the current rate of increase is also lower than the average of the past three years. Heating fuels are 48% of the total inventory and have fallen 1.3 MMB during the past week. Distillate production dipped while demand increased. The supply of propane for the current week declined 1.5 MMB from the prior reporting period but is in the normal range for the time of the year. The natural gas supply available for distribution in August 1995 was estimated to be 1,795 BCF, which was almost unchanged from the previous year. The August 1995 consumption of 1,502 BCF was 6% greater than the previous year. This gas volume included 276 BCF injected into underground storage and 16 BCF exported. In July 1995, major gas pipeline companies paid an average of $1.91/KCF for gas purchased from domestic producers, which was a decrease from $2.03 in the previous month. The price for imported gas was $1.10/KCF. Heating oil prices showed little movement during this period, as did propane prices.

NONE

1995-11-01T23:59:59.000Z

433

Winter fuels report. Week ending: October 13, 1995  

SciTech Connect (OSTI)

The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and State and local governments on the following topics: distillate fuel oil net production, imports and stocks on a US level and for all Petroleum Administration for Defense Districts (PADD) and product supplied on a US level; propane net production, imports and stocks on a US level and for PADD`s I, II, and III; natural gas supply and disposition and underground storage for the US and consumption for all PADD`s, as well as selected National average prices; residential and wholesale pricing data for heating oil and propane for those States participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the US and selected cities; and a 6--10-Day and 30-Day outlook for temperature and precipitation and US total heating degree-days by city. This report is published weekly by the EIA starting the second week in October 1995 and will continue until the second week in April 1996. The data will also be available electronically after 5:00 p.m. on Wednesday and Thursday during the heating season through the EIA Electronic Publication System (EPUB). 36 figs., 13 tabs.

NONE

1995-10-19T23:59:59.000Z

434

Winter fuels report, week ending October 5, 1990  

SciTech Connect (OSTI)

The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and state and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on a US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD) I, II, and III; natural gas supply and disposition and underground storage, for the United States and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those states participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the United States and selected cities; and US total heating degree-days by city. This report will be published weekly by the EIA starting the first week in October 1990 and will continue until the first week in April 1991. The data will also be electronically after 5:00 p.m. on Thursday during the heating season through the EIA Electronic Publication System (EPUB). See page ii for details. 12 tabs.

Not Available

1990-10-11T23:59:59.000Z

435

DPhil Project (2012-16, 3.5 years CASE EPSRC funding expected) Ion-scale turbulence in MAST spherical tokamak: experimental data analysis  

E-Print Network [OSTI]

DPhil Project (2012-16, 3.5 years CASE EPSRC funding expected) Ion-scale turbulence in MAST provides free energy to feed plasma instabilities at the scale of ion Larmor motion and the turbulence, allowing a direct comparison of derived statistical measures, e.g., spatio-temporal correlation functions

Schekochihin, Alexander A.

436

In-Jet Tracking Efficiency Analysis for the STAR Time Projection Chamber in Polarized Proton-Proton Collisions at sqrt(s) = 200GeV  

E-Print Network [OSTI]

As one of the major mid-rapidity tracking devices of the STAR detector at the Relativistic Heavy-Ion Collider (RHIC), the Time Projection Chamber (TPC) plays an important role in measuring trajectory and energy of high energy charged particles...

Huo, Liaoyuan

2012-07-16T23:59:59.000Z

437

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

438

Near-surface gas mapping studies of salt geologic features at Weeks Island and other sites  

SciTech Connect (OSTI)

Field sampling and rapid gas analysis techniques were used to survey near-surface soil gases for geotechnical diagnostic purposes at the Weeks Island Strategic Petroleum Reserve (SPR) site and other salt dome locations in southern Louisiana. This report presents the complete data, results and interpretations obtained during 1995. Weeks Island 1994 gas survey results are also briefly summarized; this earlier study did not find a definitive correlation between sinkhole No. 1 and soil gases. During 1995, several hundred soil gas samples were obtained and analyzed in the field by gas chromatography, for profiling low concentrations and gas anomalies at ppm to percent levels. The target gases included hydrogen, methane, ethane and ethylene. To supplement the field data, additional gas samples were collected at various site locations for laboratory analysis of target gases at ppb levels. Gases in the near-surface soil originate predominantly from the oil, from petrogenic sources within the salt, or from surface microbial activity. Surveys were conducted across two Weeks Island sinkholes, several mapped anomalous zones in the salt, and over the SPR repository site and its perimeter. Samples were also taken at other south Louisiana salt dome locations for comparative purposes. Notable results from these studies are that elevated levels of hydrogen and methane (1) were positively associated with anomalous gassy or shear zones in the salt dome(s) and (2) are also associated with suspected salt fracture (dilatant) zones over the edges of the SPR repository. Significantly elevated areas of hydrogen, methane, plus some ethane, were found over anomalous shear zones in the salt, particularly in a location over high pressure gas pockets in the salt, identified in the mine prior to SPR operations. Limited stable isotope ratio analyses, SIRA, were also conducted and determined that methane samples were of petrogenic origin, not biogenic.

Molecke, M.A. [Sandia National Lab., Albuquerque, NM (United States); Carney, K.R.; Autin, W.J.; Overton, E.B. [Louisiana State Univ., Baton Rouge, LA (United States)

1996-10-01T23:59:59.000Z

439

Winter fuels report. Week ending, January 26, 1996  

SciTech Connect (OSTI)

The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers analysts, and State and local governments on the following topics: (1) distillate fuel oil net production, imports and stocks on a U.S. level and for all Petroleum Administration for Defense Districts (PADD) and product supplied on a U.S. level; (2) propane net production, imports and stocks on a U.S. level and for PADD`s I, II, and III; (3) natural gas supply and disposition and underground storage for the U.S. and consumption for all PADD`s; as well as selected National average prices; (4) residential and wholesale pricing data for heating oil and propane for those States participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; (5) crude oil and petroleum price comparisons for the U.S. and selected cities; and (6) a 6-10 Day and 30-Day outlook for temperature and precipitation and U.S. total heating degree-days by city. The distillate fuel oil and propane supply data are collected and published weekly. The data are based on company submissions for the week ending 7:00 a.m. for the preceding Friday. Weekly data for distillate fuel oil are also published in the Weekly Petroleum Status Report. Monthly data for distillate fuel oil and propane are published in the Petroleum Supply Monthly. The residential pricing information is collected by the EIA and the State Energy Offices on a semimonthly basis for the EIA/State Heating Oil and Propane Program. The wholesale price comparison data are collected daily and are published weekly. Residential heating fuel prices are derived from price quotes for home delivery of No. 2 fuel oil and propane. As such, they reflect prices in effect on the dates shown. Wholesale heating oil and propane prices are estimates using a sample of terminal quotes to represent average State prices on the dates given.

NONE

1996-01-23T23:59:59.000Z

440

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Perspectives on Project Finance  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

442

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

Princeton Plasma Physics Laboratory

443

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

Princeton Plasma Physics Laboratory

444

CIMI PROJECT LONG TERM THEMATIC PROJECT  

E-Print Network [OSTI]

thematic projects (3 months) on specific topics in mathematics, computer science and their interactionsCIMI PROJECT LONG TERM THEMATIC PROJECT This document aims at providing guidance on the format to be used when submitting a scientific project to CIMI Executive Committee. CIMI will support long term

Ledoux, Michel

445

Livingston Solar Canopy Project The Project  

E-Print Network [OSTI]

,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

Delgado, Mauricio

446

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

447

Chopwell Wood Health Project  

E-Print Network [OSTI]

Chopwell Wood Health Project An innovative project of school visits and General Practitioner. The project took place at Chopwell Wood a 360 hectare mixed woodland managed by the Forestry Commission to carry on being involved in the project. Next stage of the project Although the project leader has now

448

MotorWeek Fuel Cell Video | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

project. 100% of their onion waste, up to 300,000 pounds per day, is converted into biogas to make hydrogen that in turn powers a pair of 300-kilowatt fuel cells. Their electric...

449

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

450

Project Earth Lover  

SciTech Connect (OSTI)

Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

Slobotski, Stephanie,

2011-09-01T23:59:59.000Z

451

Geobacter Project  

SciTech Connect (OSTI)

Analysis of the Genetic Potential and Gene Expression of Microbial Communities Involved in the In Situ Bioremediation of Uranium and Harvesting Electrical Energy from Organic Matter The primary goal of this research is to develop conceptual and computational models that can describe the functioning of complex microbial communities involved in microbial processes of interest to the Department of Energy. Microbial Communities to be Investigated: (1) Microbial community associated with the in situ bioremediation of uranium-contaminated groundwater; and (2) Microbial community that is capable of harvesting energy from waste organic matter in the form of electricity.

Derek Lovley; Maddalena Coppi; Stacy Ciufo; Barbara Methe; Pablo, Pomposiello; Steve Sandler; Cinthia Nunez; Daniel Bond; Susan Childers; Carol Giometti; Julia Krushkal; Christophe Shilling; Bernard Palsson

2004-03-17T23:59:59.000Z

452

Earth Science Week 2009, "Understanding Climate", Highlights and News Clippings  

SciTech Connect (OSTI)

The American Geological Institute (AGI) proposes to expand its influential Earth Science Week Program in 2009, with the support of the U.S. Department of Energy, to disseminate DOE's key messages, information, and resources on climate education and to include new program components. These components, ranging from online resources to live events and professional networks, would significantly increase the reach and impact of AGI's already successful geoscience education and public awareness effort in the United States and abroad in 2009, when the campaign's theme will be "Understanding Climate."

Robeck, Edward C. [American Geological Institute; Coulson, Doug [PS International

2010-01-05T23:59:59.000Z

453

Picture of the Week: Climate feedbacks from a warming arctic  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome to theNews & Blog »Physics PhysicsWeek » Picture

454

5-Week Weight Management Class - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience hands-onASTROPHYSICS H.CarbonMarch Value4EnergyPolicy5-Week

455

Weekly Highlights: February 2015 | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and Materials Disposition3February 2015 PPPL Weekly Highlights

456

Weekly Highlights: January 2015 | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and Materials Disposition3February 2015 PPPL Weekly

457

Weekly Highlights: July 2014 | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and Materials Disposition3February 2015 PPPL WeeklyJuly 2014 PPPL

458

Weekly Highlights: June 2014 | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and Materials Disposition3February 2015 PPPL WeeklyJuly 2014

459

Weekly Highlights: March 2015 | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and Materials Disposition3February 2015 PPPL WeeklyJuly 2014March

460

Weekly Highlights: November 2014 | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and Materials Disposition3February 2015 PPPL WeeklyJuly

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Weekly Highlights: October 2014 | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and Materials Disposition3February 2015 PPPL WeeklyJulyOctober

462

Fermilab Today | Tip of the Week Archive | 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibility ofSmall Works:Oklahoma StateBuffalo MayTip of the Week

463

PROJECT INFORMATION Project Number: S61268-583  

E-Print Network [OSTI]

ANALYSIS Narrative summary Expected results Performance measurement Assumptions and level of risk Goal and decision-makers with tools for developing IWRM policies in three DC's (Grenada, Guyana, Jamaica) by Year 6, Grenada and Guyana are committed to achieving and sustaining project results. Level of Risk: Low 2

Barthelat, Francois

464

Ribosomal Database Project II  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The Ribosomal Database Project (RDP) provides ribosome related data and services to the scientific community, including online data analysis and aligned and annotated Bacterial small-subunit 16S rRNA sequences. As of March 2008, RDP Release 10 is available and currently (August 2009) contains 1,074,075 aligned 16S rRNA sequences. Data that can be downloaded include zipped GenBank and FASTA alignment files, a histogram (in Excel) of the number of RDP sequences spanning each base position, data in the Functional Gene Pipeline Repository, and various user submitted data. The RDP-II website also provides numerous analysis tools.[From the RDP-II home page at http://rdp.cme.msu.edu/index.jsp

465

Project Profile: Alexandra Nigh  

E-Print Network [OSTI]

which construction, agriculture, marine, and industry builders contain Cummins or Rams engines first French business call this past week which went remarkably smoothly despite my fears.) I remain

Almor, Amit

466

Subject: Integrated Safety Analysis: Why It Is Appropriate for Fuel Recycling Facilities Project Number: 689Nuclear Energy Institute (NEI) Letter, 9/10/10  

Broader source: Energy.gov [DOE]

Enclosed for your review is a Nuclear Energy Institute white paper on the use of Integrated Safety Analysis (ISA) at U.S. Nuclear Regulatory Commission-licensed recycling facilities. This paper is...

467

Planets from the HATNet project  

E-Print Network [OSTI]

We summarize the contribution of the HATNet project to extrasolar planet science, highlighting published planets (HAT-P-1b through HAT-P-26b). We also briefly discuss the operations, data analysis, candidate selection and confirmation procedures, and we summarize what HATNet provides to the exoplanet community with each discovery.

Bakos, G ; Torres, G; Kovcs, G; Noyes, R W; Latham, D W; Sasselov, D D; Bky, B

2011-01-01T23:59:59.000Z

468

Project Sponsor Professor Peter  

E-Print Network [OSTI]

Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

Levi, Ran

469

Project Structure Elke Karrenberg  

E-Print Network [OSTI]

Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

Kaus, Boris

470

Analysis & Tools to Spur Increased Deployment of " Waste Heat...  

Open Energy Info (EERE)

Project Type Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type Topic 2 Topic Area 2: Data Gathering and Analysis Project...

471

Administrative Excellence Shaping Our Future Phase II Work Team Project Charter  

E-Print Network [OSTI]

of current policies and operations to support and enhance MRO supplies purchasing. · developing detailed or desired policies; conduct analysis and build business case content · Weeks 7 to 8 ­ Discuss business case and implementation plan; conduct additional analysis as required · Weeks 9 to 10 ­Finalize business case

Sheridan, Jennifer

472

This Week in The Journal F Cellular/Molecular  

E-Print Network [OSTI]

to the repulsive effects of semaphorin 3F (Sema3F). Ex- pression of NrCAM on rostrally project- ing thalamocortical on thalamocortical axons decreases after the axons reach the cortex, and NrCAM ex- pression then increases in deep, NrCAM was localized in dendritic spines of star py- ramidal cells in layer 4 of mouse visual cor- tex

Newman, Eric A.

473

Supplement to the Princeton Alumni Weekly January 2008  

E-Print Network [OSTI]

Parking and Shuttles Traffic TEN-YEAR PROJECTS 18 A SUSTAINABLE CAMPUS 20 LOOKING TO THE FUTURE 21 of the sciences renders older buildings obsolete for their current uses and creates new fields of study buildings in a variety of architectural styles. Between 1906 and 1929, Ralph Adams Cram transformed

474

Recovery Act Weekly Video: Upper ALE Building Demolition  

ScienceCinema (OSTI)

CH2MHILL Plateau Remediation Company demolition of 6652C Space Science Laboratory. The largest building atop Rattlesnake Mountain, the laboratory served as a nightly radar patrol center as well as a barracks. The Recovery Act funded project is helping reduce the site footprint.

None

2012-06-14T23:59:59.000Z

475

Perspectives in Practice A Garden Pilot Project Enhances Fruit and  

E-Print Network [OSTI]

RESEARCH Perspectives in Practice A Garden Pilot Project Enhances Fruit and Vegetable Consumption among Children STEPHANIE HEIM, MPH, RD; JAMIE STANG, PhD, MPH, RD; MARJORIE IRELAND, PhD ABSTRACT Fruit a strategy for increasing fruit and vegetable intake in chil- dren. A 12-week pilot intervention was designed

Maxwell, Bruce D.

476

Suggested Projects CS 6301-005: Language-based Security  

E-Print Network [OSTI]

of 3-4 students · Implement and/or prove something interesting in Coq · Worth 30% of grade · Due during finals week (in lieu of final exam) · Deliverables · Written report (5-10 pages) · Coq implementation + 5 minutes Q&A #12;Suggested Project Topics 1) Use Stewart's Software-Defined Networking Coq code

Hamlen, Kevin W.

477

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

Perkins, Richard A.

478

CS348 Project 1 Oracle Project  

E-Print Network [OSTI]

CS348 Project 1 Oracle Project Due Date: 2/12/2009 You are going to use Oracle to design a simple; if nothing else, mark each query with its number. Turnin You may turn in the project for grading using the procedure described below. Run the following shell command (see 'man turnin' for details): turnin -c cs348

Elmagarmid, Ahmed K.

479

Real Options for Project Schedules (ROPS)  

E-Print Network [OSTI]

Real Options for Project Schedules (ROPS) has three recursive sampling/optimization shells. An outer Adaptive Simulated Annealing (ASA) optimization shell optimizes parameters of strategic Plans containing multiple Projects containing ordered Tasks. A middle shell samples probability distributions of durations of Tasks. An inner shell samples probability distributions of costs of Tasks. PATHTREE is used to develop options on schedules.. Algorithms used for Trading in Risk Dimensions (TRD) are applied to develop a relative risk analysis among projects.

Ingber, Lester

2007-01-01T23:59:59.000Z

480

project.m  

E-Print Network [OSTI]

function project(u,w) %last updated 5/9/94 %PROJECT Projecting vector U onto vector W orthogonally. Vectors % U and W can be either a pair of 2D or 3D...

Note: This page contains sample records for the topic "analysis projections weekly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Super Projects (Arkansas)  

Broader source: Energy.gov [DOE]

A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a projects infrastructure, limited to 5% of the net general revenues during the...

482

Project Selection - Record Keeping  

E-Print Network [OSTI]

4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

483

Site-specific analysis of the cobbly soils at the Grand Junction processing site. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

This report describes a recent site-specific analysis to evaluate the necessity of a recommendation to install a slurry trench around the Grand Junction processing site. The following analysis addresses the cobbly nature of the site's radiologically contaminated foundation soil, reassesses the excavation depths based on bulk radionuclide concentrations, and presents data-based arguments that support the elimination of the initially proposed slurry trench. The slurry trench around the processing site was proposed by the Remedial Action Contractor (RAC) to minimize the amount of water encountered during excavation. The initial depths of excavation developed during conceptual design, which indicated the need for a slurry wall, were reexamined as part of this analysis. This reanalysis, based on bulk concentrations of a cobbly subsoil, supports decreasing the original excavation depth, limiting the dewatering quantities to those which can be dissipated by normal construction activities. This eliminates the need for a slurry trench andseparate water treatment prior to permitted discharge.

Not Available

1992-06-01T23:59:59.000Z

484

HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SEISMIC ANALYSIS IN SUPPORT OF INCREASED LIQUID LEVEL IN 241-AP TANK FARMS  

SciTech Connect (OSTI)

The essential difference between Revision 1 and the original issue of this report is in the spring constants used to model the anchor bolt response for the anchor bolts that tie the steel dome of the primary tank to the concrete tank dome. Consequently, focus was placed on the changes in the anchor bolt responses, and a full reevaluation of all tank components was judged to be unnecessary. To confirm this judgement, primary tank stresses from the revised analysis of the BES-BEC case are compared to the original analysis and it was verified that the changes are small, as expected.

TC MACKEY; FG ABATT; MW RINKER

2009-01-14T23:59:59.000Z

485

Final report on Weeks Island Monitoring Phase : 1999 through 2004.  

SciTech Connect (OSTI)

This Final Report on the Monitoring Phase of the former Weeks Island Strategic Petroleum Reserve crude oil storage facility details the results of five years of monitoring of various surface accessible quantities at the decommissioned facility. The Weeks Island mine was authorized by the State of Louisiana as a Strategic Petroleum Reserve oil storage facility from 1979 until decommissioning of the facility in 1999. Discovery of a sinkhole over the facility in 1992 with freshwater inflow to the facility threatened the integrity of the oil storage and led to the decision to remove the oil, fill the chambers with brine, and decommission the facility. Thereafter, a monitoring phase, by agreement between the Department of Energy and the State, addressed facility stability and environmental concerns. Monitoring of the surface ground water and the brine of the underground chambers from the East Fill Hole produced no evidence of hydrocarbon contamination, which suggests that any unrecovered oil remaining in the underground chambers has been contained. Ever diminishing progression of the initial major sinkhole, and a subsequent minor sinkhole, with time was verification of the response of sinkholes to filling of the facility with brine. Brine filling of the facility ostensively eliminates any further growth or new formation from freshwater inflow. Continued monitoring of sinkhole response, together with continued surface surveillance for environmental problems, confirmed the intended results of brine pressurization. Surface subsidence measurements over the mine continued throughout the monitoring phase. And finally, the outward flow of brine was monitored as a measure of the creep closure of the mine chambers. Results of each of these monitoring activities are presented, with their correlation toward assuring the stability and environmental security of the decommissioned facility. The results suggest that the decommissioning was successful and no contamination of the surface environment by crude oil has been found.

Ehgartner, Brian L.; Munson, Darrell Eugene

2005-05-01T23:59:59.000Z

486

Construction Industry Week, September 23-27, 2013 MORNING SESSION AFTERNOON SESSION EVENING SESSION  

E-Print Network [OSTI]

Construction Industry Week, September 23-27, 2013 MORNING SESSION AFTERNOON SESSION EVENING SESSION Subcontractor ............................................ Lithko Friday, September 27, 2013 -- CONSTRUCTION LAB;Construction Industry Week Purpose and Goals To educate and enlighten CMT students to industry standards, flow

Piao, Daqing

487

Question of the Week: Do You Use Renewable Energy in Your Home...  

Broader source: Energy.gov (indexed) [DOE]

Energy-Saving Improvements are on Your To-Do List? Question of the Week: How Will You Landscape for Energy Efficiency? Question of the Week: Are You Considering an Energy-Related...

488

Question of the Week: How Do You Reduce the Energy Used by Computers...  

Broader source: Energy.gov (indexed) [DOE]

Question of the Week: How Do You Reduce the Energy Used by Computers and Office Electronics? Question of the Week: How Do You Reduce the Energy Used by Computers and Office...

489

Question of the Week: What are Your Strategies for Saving Money...  

Energy Savers [EERE]

Question of the Week: What are Your Strategies for Saving Money and Energy in the Winter? Question of the Week: What are Your Strategies for Saving Money and Energy in the Winter?...

490

Configuration mixing of angular-momentum projected triaxial relativistic mean-field wave functions. II. Microscopic analysis of low-lying states in magnesium isotopes  

E-Print Network [OSTI]

The recently developed structure model that uses the generator coordinate method to perform configuration mixing of angular-momentum projected wave functions, generated by constrained self-consistent relativistic mean-field calculations for triaxial shapes (3DAMP+GCM), is applied in a systematic study of ground states and low-energy collective states in the even-even magnesium isotopes $^{20-40}$Mg. Results obtained using a relativistic point-coupling nucleon-nucleon effective interaction in the particle-hole channel, and a density-independent $\\delta$-interaction in the pairing channel, are compared to data and with previous axial 1DAMP+GCM calculations, both with a relativistic density functional and the non-relativistic Gogny force. The effects of the inclusion of triaxial degrees of freedom on the low-energy spectra and E2 transitions of magnesium isotopes are examined.

J. M. Yao; H. Mei; H. Chen; J. Meng; P. Ring; D. Vretenar

2010-06-08T23:59:59.000Z

491

Falls Creek Hydroelectric Project  

SciTech Connect (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

492

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 274...

493

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 259...

494

Project Risk Management:.  

E-Print Network [OSTI]

?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore be (more)

Koelmeyer, Chris

2013-01-01T23:59:59.000Z

495

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

496

Project BETA Cover Page  

E-Print Network [OSTI]

and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

Cover Page, Project BETA

2012-01-01T23:59:59.000Z

497

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Report Project to date through March 2013 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity...

498

Project Finance and Investments  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

499

Clean Coal Projects (Virginia)  

Broader source: Energy.gov [DOE]

This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

500

A A L B O R G U N I V E R S I T Y State of the Art Analysis for the `SolcelleInverter' project  

E-Print Network [OSTI]

electronic inverter that converts light into electrical alternating (AC) power when it is connected-of-the-Art (SOTA / SOA), Grid-tied Inverter, Single-Phase, Standards, Maximum Power Point Tracking, Islanding Analysis of Possible Solutions for Inverter W.4 Development And Simulation of New Topologies W.5 Selection