Powered by Deep Web Technologies
Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Long-run marginal costs lower than average costs  

SciTech Connect

The thesis of this article is that the long-run marginal costs of electricity are not always greater than the present average costs, as is often assumed. As long as short-run costs decrease with new plant additions, the long-run marginal cost is less than long-run average cost. When average costs increase with new additions, long-run marginal costs are greater than long-run average costs. The long-run marginal costs of a particular utility may be less than, equal to, or greater than its long-run average costs - even with inflation present. The way to determine which condition holds for a given utility is to estimate costs under various combinations of assumptions: probable load growth, zero load growth, and load growth greater than expected; and changes in load factor with attendant costs. Utilities that can demonstrate long-run marginal costs lower than long-run average costs should be encouraged to build plant and increase load, for the resulting productivity gains and slowing of inflation. Utilities that face long-run marginal costs greater than long-run average costs should discourage growth in sales through any available means.

Hunter, S.R.

1980-01-03T23:59:59.000Z

2

Average-case active learning with costs  

Science Conference Proceedings (OSTI)

We analyze the expected cost of a greedy active learning algorithm. Our analysis extends previous work to a more general setting in which different queries have different costs. Moreover, queries may have more than two possible responses and the distribution ...

Andrew Guillory; Jeff Bilmes

2009-10-01T23:59:59.000Z

3

The Effect of Spatial and Temporal Averaging on Sampling Strategies for Cloud Amount Data  

Science Conference Proceedings (OSTI)

Sampling and averaging strategies are as significant an influence upon the resulting cloud climatologies as the resolution of the original cloud archives. An investigation of total cloud amount data, as represented by the U.S. Air Force 3-...

N. A. Hughes; A. Henderson-Sellers

1983-03-01T23:59:59.000Z

4

Figure 34. Ratio of average per megawatthour fuel costs ...  

U.S. Energy Information Administration (EIA)

Title: Figure 34. Ratio of average per megawatthour fuel costs for natural gas combined-cycle plants to coal-fired steam turbines in the RFC west ...

5

Figure 33. Ratio of average per megawatthour fuel costs for ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 33. Ratio of average per megawatthour fuel costs for natural gas combined-cycle plants to coal-fired steam turbines in the SERC southeast ...

6

Figure 27. Ratio of average per megawatthour fuel costs for ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 27. Ratio of average per megawatthour fuel costs for natural gas combined-cycle plants to coal-fired steam turbines in five cases, 2008-2040

7

Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Upgrades to Yield Added Generation at Average Costs Less Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams November 4, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Energy Secretary Steven Chu today announced up to $30.6 million in Recovery Act funding for the selection of seven hydropower projects that modernize hydropower infrastructure by increasing efficiency and reducing environmental impacts at existing facilities. The expanded hydro generation projects have estimated incremental costs of less than 4 cents per kWh on average. The selections announced today will deploy innovative technologies such as high-efficiency, fish-friendly turbines, improved water intakes, and

8

A Simple Parcel Method for Prediction of Cumulus Onset and Area-Averaged Cloud Amount over Heterogeneous Land Surfaces  

Science Conference Proceedings (OSTI)

The purpose of this note is to compare several methods for predicting the onset and quantitative amount of cloud cover over heterogeneous land surfaces. Among the methods tested are that of Wilde et al. (1985) and a new, simple parcel approach. ...

Peter J. Wetzel

1990-06-01T23:59:59.000Z

9

Long-run incremental costs and the pricing of electricity. Part II. [Comparative evaluation of marginal cost pricing and average cost pricing  

SciTech Connect

Total costs have essentially the same cost components whether long-run average costs or long-run incremental costs are used. The variable components, chiefly fuel, may be somewhat different in the new incremental plant compared to the old average plant; where the difference is between nuclear fuel and fossil fuel, its size is substantial. However, given the same kind of plant, the current prices of materials and labor will be essentially the same whether used in the new or the old plant with long-run incremental costs (LRIC) or long-run average costs (LRAC). The lower cost of electricity produced in nuclear plants constructed today, as compared to fossil fuel plants constructed at the same time, is not to be confused with the relation between LRIC and LRAC. LRAC is the average cost of electricity from all existing plants priced at their historical costs, which were generally lower than current costs. These average historical costs per kilowatt are still likely to be lower than the current incremental cost per kilowatt of the newest nuclear plant built at present price levels. LRAC is, therefore, still likely to be lower than LRIC for either fossil or nuclear. Data from the Wisconsin Power and Light Company, the Madison Gas and Electric Company, and Tuscon Gas and Electric Company are examined to study some comparisons. Some pricing principles that vary seasonally for resort hotels are reviewed. (MCW)

Morton, W.A.

1976-03-25T23:59:59.000Z

10

The University of Texas at Austin Average Cost of Attendance per Academic Year (Fall & Spring)  

E-Print Network (OSTI)

The University of Texas at Austin Average Cost of Attendance per Academic Year (Fall & Spring) for Texas Resident Undergraduates 2010-2011 - Calculations based on a course load of 15-hours per semester of rules set forth by the Texas Higher Education Coordinating Board regarding the implementation of Senate

Texas at Austin, University of

11

Average System Cost Methodology : Administrator's Record of Decision.  

SciTech Connect

Significant features of average system cost (ASC) methodology adopted are: retention of the jurisdictional approach where retail rate orders of regulartory agencies provide primary data for computing the ASC for utilities participating in the residential exchange; inclusion of transmission costs; exclusion of construction work in progress; use of a utility's weighted cost of debt securities; exclusion of income taxes; simplification of separation procedures for subsidized generation and transmission accounts from other accounts; clarification of ASC methodology rules; more generous review timetable for individual filings; phase-in of reformed methodology; and each exchanging utility must file under the new methodology within 20 days of implementation by the Federal Energy Regulatory Commission of the ten major participating utilities, the revised ASC will substantially only affect three. (PSB)

United States. Bonneville Power Administration.

1984-06-01T23:59:59.000Z

12

Italian Association of Energy EconomistsYardstick Regulation of Electricity Distribution Utilities Based on the Estimation of an Average Cost Function *  

E-Print Network (OSTI)

In this paper we estimate an average-cost function for a panel of 45 Swiss electricity distribution utilities as a basis for yardstick regulation of the distribution-network access prices. Unlike the existing literature, we separate the electricity sales function of utilities from the network operation function. Several exogenous variables measuring the heterogeneity of the service areas were included in the model specification in order to allow the regulator to set differentiated benchmark prices incorporating this heterogeneity. We can identify different exogenous service area characteristics that affect average cost. These are the load factor, the customer density and the output density of different consumer groups. Moreover, the estimation results indicate the existence of significant economies of scale; i.e. most of the Swiss utilities in our sample are too small to reach minimum efficient scale. However, to give the small utilities incentives to merge the size of the utilities must not be included in the yardstick calculation. 1.

Massimo Filippini; Jörg Wild; Massimo Filippini; Jörg Wild

1999-01-01T23:59:59.000Z

13

APPROXIMATE YEARLY BUDGET, 20112012 (summer, fall, winter) the table below shows an estimate of the yearly cost per person for studying in montral. all amounts are in Canadian  

E-Print Network (OSTI)

) immigration (temporary residents) 300 $ arrival from abroad (hotel, meals...) 500 $ winter clothing 800.santeetudiante.com (in french only). 9 these amounts include furniture, utilities (water, electricity, heating

Skorobogatiy, Maksim

14

DOE Average Results  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE DOE Average Results FY 12 DOE Target FY 12 Customer Perspective: Customer Satisfaction: -Timeliness 92 88 -Quality 94 92 Effective Service Partnership: -Extent of Customer Satisfaction with the responsiveness, etc. 90 92 Internal Business Perspective: Acquisition Excellence: -Extent to which internal quality control systems are effective 90 88 Most Effective Use of Contracting Approaches to Maximize Efficiency and Cost Effectiveness: Use of Competition: -% of total $'s obligated on competitive acquisitions >$3000 (Agency Level Only) 94 85 -% of acquisition actions competed for actions > $3000 (Agency Level Only) 65 68 Performance Based Acquisition: - % PBA actions relative to total eligible new acquisition actions (applicable to new actions > $25K) 82

15

APPROXIMATE YEARLY BUDGET, 2013-2014 (fall and winter) the table below shows an estimate of the yearly cost per person for studying in Montral. all amounts are in Canadian  

E-Print Network (OSTI)

) immigration (temporary residents) 300 $ arrival from abroad (hotel, meals...) 500 $ winter clothing 800 at santeetudiante.com. 9 these amounts include furniture, utilities (water, electricity, heating), a telephone land

16

Average Commercial Price  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Price Average Commercial Price Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes...

17

AVERAGE SHIFTED HISTOGRAM  

Science Conference Proceedings (OSTI)

... LET YPPF = XCDF LET XPPF = YCDF. Default: None Synonyms: ASH is a synonym for the AVERAGE SHIFTED HISTOGRAM command. ...

2010-12-06T23:59:59.000Z

18

China Total Cloud Amount Trends  

NLE Websites -- All DOE Office Websites (Extended Search)

Trends in Total Cloud Amount Over China DOI: 10.3334CDIACcli.008 data Data image Graphics Investigator Dale P. Kaiser Carbon Dioxide Information Analysis Center, Environmental...

19

West Texas Intermediate Spot Average ............................  

U.S. Energy Information Administration (EIA) Indexed Site

Crude Oil (dollars per barrel) Crude Oil (dollars per barrel) West Texas Intermediate Spot Average ............................ 102.88 93.42 92.24 87.96 94.34 94.10 105.84 96.30 95.67 95.33 95.67 93.33 94.12 97.64 95.00 Brent Spot Average ........................................................... 118.49 108.42 109.61 110.09 112.49 102.58 110.27 108.29 106.33 105.00 103.00 102.00 111.65 108.41 104.08 Imported Average .............................................................. 108.14 101.18 97.18 97.64 98.71 97.39 103.07 100.03 99.64 99.33 99.69 97.35 101.09 99.85 99.04 Refiner Average Acquisition Cost ...................................... 107.61 101.44 97.38 97.27 101.14 99.45 105.24 100.44 100.15 99.82 100.18 97.83 100.83 101.61 99.50 Liquid Fuels (cents per gallon) Refiner Prices for Resale Gasoline .........................................................................

20

Elastically averaged precision alignment  

E-Print Network (OSTI)

One of the most important steps in designing a machine is the consideration of the effect of interfaces between components. A badly designed interface can vary from costly difficulties such as additional control or calibration ...

Willoughby, Patrick (Patrick John), 1978-

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Audit Costs for the 1986 Texas Energy Cost Containment Program  

E-Print Network (OSTI)

Direct program costs for detailed audits of 13.5 million square feet of institutional building space in the 1986 Texas Energy Cost Containment Program were $0.047/SF. The building area was 63 percent simple (offices, schools, and universities) and 37 percent complex (medical buildings and power plants). Allowing for the influence of one large facility which received less-extensive treatment due to previous work, thorough audits were obtained for an average cost of $0.050/SF. Large medical buildings (greater than about 170,000 square feet) were audited for $0.050/SF or less, and program costs for survey audits of 17.2 million square feet were $0.0028/SF. The effect on audit costs of complexity of recommended modifications, amount of savings determined, amount of implementation costs, building size, and building complexity are discussed. Primary effects on audit costs are size and complexity of buildings. Program guidelines limited consideration of projects with greater than a four year payback.

Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

1987-01-01T23:59:59.000Z

22

average | OpenEI  

Open Energy Info (EERE)

average average Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (7 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

23

Variable Average Absolute Percent Differences  

U.S. Energy Information Administration (EIA) Indexed Site

Variable Variable Average Absolute Percent Differences Percent of Projections Over- Estimated Gross Domestic Product Real Gross Domestic Product (Average Cumulative Growth)* (Table 2) 1.0 42.6 Petroleum Imported Refiner Acquisition Cost of Crude Oil (Constant $) (Table 3a) 35.2 18.6 Imported Refiner Acquisition Cost of Crude Oil (Nominal $) (Table 3b) 34.7 19.7 Total Petroleum Consumption (Table 4) 6.2 66.5 Crude Oil Production (Table 5) 6.0 59.6 Petroleum Net Imports (Table 6) 13.3 67.0 Natural Gas Natural Gas Wellhead Prices (Constant $) (Table 7a) 30.7 26.1 Natural Gas Wellhead Prices (Nominal $) (Table 7b) 30.0 27.1 Total Natural Gas Consumption (Table 8) 7.8 70.2 Natural Gas Production (Table 9) 7.1 66.0 Natural Gas Net Imports (Table 10) 29.3 69.7 Coal Coal Prices to Electric Generating Plants (Constant $)** (Table 11a)

24

Solar: monthly and annual average global horizontal (GHI) GIS...  

Open Energy Info (EERE)

on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and...

25

Solar: monthly and annual average direct normal (DNI), global...  

Open Energy Info (EERE)

on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and...

26

Solar: monthly and annual average direct normal (DNI) GIS data...  

Open Energy Info (EERE)

on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and...

27

Evaluation of I-15 Devore (08-0A4224) Long-Life Pavement Rehabilitation Costs  

E-Print Network (OSTI)

Cost Indirect Costs Engineer's Estimate Category Amount2 lane-mi. Administrative Costs Engineer's Estimate CategoryMiles) Total (All Costs) Engineer's Estimate Amount Original

Fermo, Mary G; Santero, Nicholas J; Nokes, William; Harvey, John T

2005-01-01T23:59:59.000Z

28

Cost Study Manual  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2012 28, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a percent of payroll exceeds the comparator group by more than five percent. For example, if per capita benefit costs for the comparator group are $10,000 and the benefit costs as a percent of payroll for the comparator group are 20%, the threshold for the contractor's benefits as a

29

Census Division Number of Average Monthly Average Retail Price...  

Gasoline and Diesel Fuel Update (EIA)

Average Monthly Average Retail Price Average Monthly Bill State Consumers Consumption (kWh) (Cents per Kilowatthour) (Dollar and cents) New England 34,271 67,907 12.55 8,520.25...

30

Hydropower Upgrades to Yield Added Generation at Average Costs...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

stewardship. Under Secretary Kristina Johnson made the announcement while visiting Voith Hydro Inc.'s manufacturing plant in York, Pennsylvania. "One of the best opportunities we...

31

College of Engineering Request for Institutional Waiver of Indirect Cost  

E-Print Network (OSTI)

Investigator Sponsor Project Title Total Direct Costs Total Modified Direct Costs Full Indirect Costs Rate Full Indirect Costs Amount Total Project Costs (with Full IDC) Requested Indirect Costs Rate Requested Indirect Costs Amount Total Project Costs (with req'd IDC) Principal Investigator's Justification for Indirect

Eustice, Ryan

32

Entanglement cost of two-qubit orthogonal measurements  

E-Print Network (OSTI)

The "entanglement cost" of a bipartite measurement is the amount of shared entanglement two participants need to use up in order to carry out the given measurement by means of local operations and classical communication. Here we numerically investigate the entanglement cost of generic orthogonal measurements on two qubits. Our results strongly suggest that for almost all measurements of this kind, the entanglement cost is strictly greater than the average entanglement of the eigenstates associated with the measurements, implying that the nonseparability of a two-qubit orthogonal measurement is generically distinct from the nonseparability of its eigenstates.

Somshubhro Bandyopadhyay; Ramij Rahaman; William K. Wootters

2010-05-28T23:59:59.000Z

33

EIA Average Energy Consumption 2005  

U.S. Energy Information Administration (EIA)

Table US8. Average Consumption by Fuels Used, 2005 Physical Units per Household Fuels Used (physical units of consumption per household using the fuel)

34

Variation in Nimbus-7 Cloud Estimates. Part I: Zonal Averages  

Science Conference Proceedings (OSTI)

Zonal averages of low, middle and total cloud amount estimates derived from measurements from Nimbus-7 have been analyzed for the six-year period April 1979 through March 1985. The globally and zonally averaged values of six-year annual means and ...

Bryan C. Weare

1992-12-01T23:59:59.000Z

35

Hanford Treats Record Amount of Groundwater  

Energy.gov (U.S. Department of Energy (DOE))

Workers have treated more than 800 million gallons of groundwater at the Hanford Site so far this year, a record annual amount.

36

AVCEM: Advanced-Vehicle Cost and Energy Use Model  

E-Print Network (OSTI)

of the battery, according to the battery cost equations (seediscussion of battery cost above). There actually are twoin the amount and cost of fuel-storage, battery, vehicle

Delucchi, Mark

2005-01-01T23:59:59.000Z

37

Grid-Averaged Surface Fluxes  

Science Conference Proceedings (OSTI)

This study examines the inadequacies of formulations for surface fluxes for use in numerical models of atmospheric flow. The difficulty is that numerical models imply spatial averaging over each grid area. Existing formulations am based on the ...

L. Mahrt

1987-08-01T23:59:59.000Z

38

High average power pockels cell  

DOE Patents (OSTI)

A high average power pockels cell is disclosed which reduces the effect of thermally induced strains in high average power laser technology. The pockels cell includes an elongated, substantially rectangular crystalline structure formed from a KDP-type material to eliminate shear strains. The X- and Y-axes are oriented substantially perpendicular to the edges of the crystal cross-section and to the C-axis direction of propagation to eliminate shear strains.

Daly, Thomas P. (Pleasanton, CA)

1991-01-01T23:59:59.000Z

39

Hanford Treats Record Amount of Groundwater  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 13, 2011 September 13, 2011 Hanford Treats Record Amount of Groundwater RICHLAND, Wash. - Workers have treated more than 800 million gallons of groundwater at the Hanford Site so far this year, a record annual amount. Last year, workers with DOE contractor CH2M HILL Plateau Remediation Company treated 600 mil- lion gallons of groundwater at the site. "It's great to know the amount of treated groundwater is increasing. We are meeting our goals, which means we are protecting the Columbia River," said Bill Barrett, CH2M HILL director of pump and treat operations and maintenance. American Recovery and Reinvestment Act work to expand Hanford's capacity for treating contami- nated groundwater led to the 2011 record amount. The Recovery Act funded the installation of more

40

Core Measure Average KTR Results  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measure Measure Average KTR Results FY 12 Target FY 12 DOE M&O CONTRACTOR (KTR) BSC RESULTS FY 2012 Customer Perspective and level of communication provided by the procurement office 95 92 Internal Business Perspective: Assessment (%) of the degree to which the purchasing system is in compliance with stakeholder requirements 97 Local Goals % Delivery on-time (includes JIT, excludes Purchase Cards) 88 84 % of total dollars obligated, on actions > $150K , that were awarded using effective competition 73 Local Goals Rapid Purchasing Techniques: -% of transactions placed by users 77 Local Goals -% of transactions placed through electronic commerce 62 Local Goals Average Cycle Time: -Average cycle time for <= $150K 8 6 to 9 days

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network (OSTI)

cost data for 2009 indicates that the average cost of projects installed through the California Solar

Barbose, Galen L

2010-01-01T23:59:59.000Z

42

Solar: annual average direct normal (DNI) GIS data at 10km resolution...  

Open Energy Info (EERE)

visible irradiance, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total of the normal or beam...

43

Solar: monthly and annual average latitude tilt GIS data at 40km...  

Open Energy Info (EERE)

on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and...

44

Number of Award Federal Agencies Awards Amount  

E-Print Network (OSTI)

Universities 30 2,886,684 State of Colorado** 35 2,210,660 Miscellaneous agencies 11 498 the University of Colorado and Colorado State University Colorado School of Mines Awards by Funding Agency FiscalNumber of Award Federal Agencies Awards Amount Department of Agriculture Department of Commerce 4

45

Number of Award Federal Agencies Awards Amount  

E-Print Network (OSTI)

289 13,089,070 Other Universities 31 2,399,092 State of Colorado** 27 2,139,037 Miscellaneous agencies the University of Colorado and Colorado State University Colorado School of Mines Awards by Funding Agency FiscalNumber of Award Federal Agencies Awards Amount Department of Agriculture 1 499,815 Department

46

Number of Award Federal Agencies Awards Amount  

E-Print Network (OSTI)

,739,813 State of Colorado** 26 1,846,825 Miscellaneous agencies 10 697,285 326 29,281,431 Total Awards ReceivedNumber of Award Federal Agencies Awards Amount Department of Commerce 2 25,613 Department 215,000 Environmental Protection Agency 0 - National Aeronautics and Space Administration 1 30

47

Number of Award Federal Agencies Awards Amount  

E-Print Network (OSTI)

,096,445 State of Colorado 22 1,007,618 Miscellaneous agencies 10 514,288 327 24,608,655 Total Awards ReceivedNumber of Award Federal Agencies Awards Amount Department of Commerce 3 117,227 Department,385,219 Environmental Protection Agency 1 21,602 National Aeronautics and Space Administration 5 703,140 National

48

Achronal averaged null energy condition  

Science Conference Proceedings (OSTI)

The averaged null energy condition (ANEC) requires that the integral over a complete null geodesic of the stress-energy tensor projected onto the geodesic tangent vector is never negative. This condition is sufficient to prove many important theorems in general relativity, but it is violated by quantum fields in curved spacetime. However there is a weaker condition, which is free of known violations, requiring only that there is no self-consistent spacetime in semiclassical gravity in which ANEC is violated on a complete, achronal null geodesic. We indicate why such a condition might be expected to hold and show that it is sufficient to rule out closed timelike curves and wormholes connecting different asymptotically flat regions.

Graham, Noah; Olum, Ken D. [Department of Physics, Middlebury College, Middlebury, Vermont 05753 (United States) and Center for Theoretical Physics, Laboratory for Nuclear Science, and Department of Physics, Massachusetts Institute of Technology, Cambridge, Massachusetts 02139 (United States); Institute of Cosmology, Department of Physics and Astronomy, Tufts University, Medford, Massachusetts 02155 (United States)

2007-09-15T23:59:59.000Z

49

Achronal averaged null energy condition  

E-Print Network (OSTI)

The averaged null energy condition (ANEC) requires that the integral over a complete null geodesic of the stress-energy tensor projected onto the geodesic tangent vector is never negative. This condition is sufficient to prove many important theorems in general relativity, but it is violated by quantum fields in curved spacetime. However there is a weaker condition, which is free of known violations, requiring only that there is no self-consistent space-time in semiclassical gravity in which ANEC is violated on a complete, {\\em achronal} null geodesic. We indicate why such a condition might be expected to hold and show that it is sufficient to rule out wormholes and closed timelike curves.

Noah Graham; Ken D. Olum

2007-05-22T23:59:59.000Z

50

Information Leakage via Electromagnetic Emanation and Effectiveness of Averaging Technique  

Science Conference Proceedings (OSTI)

It is well known that there is relationship between electromagnetic emanation and processing information in IT devices such as personal computers and smart cards. In this paper, we show how to estimate amount of information that is leaked as electromagnetic ... Keywords: Tempest, Channel capacity, electromagnetic emanation, averaging technique

Hidema Tanaka

2008-04-01T23:59:59.000Z

51

High-resolution modeling of the western North American power system demonstrates low-cost and low-carbon futures  

E-Print Network (OSTI)

Administration, 2008). A number of low- carbon power generation technologies are available today, but many-rated by their forced outage rates to represent the amount of power generation capacity that is available on average). Rather, it does so indirectly, by changing the relative costs of power generating technologies

Kammen, Daniel M.

52

Spectral and Parametric Averaging for Integrable Systems  

E-Print Network (OSTI)

We analyze two theoretical approaches to ensemble averaging for integrable systems in quantum chaos - spectral averaging and parametric averaging. For spectral averaging, we introduce a new procedure - rescaled spectral averaging. Unlike traditional spectral averaging, it can describe the correlation function of spectral staircase and produce persistent oscillations of the interval level number variance. Parametric averaging, while not as accurate as rescaled spectral averaging for the correlation function of spectral staircase and interval level number variance, can also produce persistent oscillations of the global level number variance and better describes saturation level rigidity as a function of the running energy. Overall, it is the most reliable method for a wide range of statistics.

Tao Ma; R. A. Serota

2013-06-03T23:59:59.000Z

53

AVCEM: Advanced Vehicle Cost and Energy Use Model. Overview of AVCEM  

E-Print Network (OSTI)

of the battery, according to the battery cost equations (seediscussion of battery cost above). There actually are twoin the amount and cost of fuel-storage, battery, vehicle

Delucchi, Mark

2005-01-01T23:59:59.000Z

54

A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys  

E-Print Network (OSTI)

Std Dev Cost Per Annual Cost Per kWh Usage Peak kW AverageStd Dev Cost Per Annual Cost Per kWh Usage Peak kW Average3-2. Logged Outage Cost per Annual kWh Figure 3-3. Logged

Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

2003-01-01T23:59:59.000Z

55

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

56

Middle East Production Costs - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Persian Gulf Oil Production Capacity and Development Cost Forecast (without additional development to replace production) Based on Low-Case Weighted Average

57

2013-2014 Projected Aviation Program Costs  

E-Print Network (OSTI)

06/21/13 2013-2014 Projected Aviation Program Costs UND Aerospace offers two aviation degree the cost of a degree program. BACHELOR of BUSINESS ADMINISTRATION ** Flight Costs Airport Management Survey Certificate $ 11,574 **NOTE: Total flight costs are based on averages and are subject to change. Also, the ATC

Delene, David J.

58

Modeling of Cost Curves 1.0 Costs of Generating Electrical Energy  

E-Print Network (OSTI)

production costs. Some typical average costs of fuel are given in the following table for coal, petroleum [1] Petroleum [2] Natural Gas [3] All Fossil Fuels Receipts (Billion BTU) Average Cost Avg. Sulfur fuel, kerosene, petroleum coke (converted to liquid petroleum, see Technical Notes for conversion

McCalley, James D.

59

Solar: monthly and annual average direct normal (DNI), global horizontal  

Open Energy Info (EERE)

South America from NREL South America from NREL Dataset Summary Description (Abstract): Monthly Average Solar Resource for horizontal and tilted flat-plates, and 2-axis tracking concentrating collectors. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to solar collectors. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and sky) falling on a horizontal surface. Existing ground measurement stations are used to validate the data where possible. The modeled values are accurate to approximately 10% of a true measured value within the grid cell due to the uncertainties associated with meteorological input to the model. The local cloud cover can vary significantly even within a single grid cell as a result of terrain effects and other microclimate influences. Furthermore, the uncertainty of the modeled estimates increase with distance from reliable measurement sources and with the complexity of the terrain.

60

Solar: monthly and annual average direct normal (DNI), global horizontal  

Open Energy Info (EERE)

Central America and the Carribean from NREL Central America and the Carribean from NREL Dataset Summary Description (Abstract): Monthly Average Solar Resource for horizontal and tilted flat-plates, and 2-axis tracking concentrating collectors. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to solar collectors. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and sky) falling on a horizontal surface. Existing ground measurement stations are used to validate the data where possible. The modeled values are accurate to approximately 10% of a true measured value within the grid cell due to the uncertainties associated with meteorological input to the model. The local cloud cover can vary significantly even within a single grid cell as a result of terrain effects and other microclimate influences. Furthermore, the uncertainty of the modeled estimates increase with distance from reliable measurement sources and with the complexity of the terrain.

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Cost prediction for ray shooting  

Science Conference Proceedings (OSTI)

The ray shooting problem arises in many different contexts. For example, solving it efficiently would remove a bottleneck when images are ray-traced in computer graphics. Unfortunately, theoretical solutions to the problem are not very practical, ... Keywords: average performance, cost model, cost prediction, octree, ray shooting, space decomposition

Boris Aronov; Hervé Brönnimann; Allen Y. Chang; Yi-Jen Chiang

2002-06-01T23:59:59.000Z

62

The Relationship between Meteorological Parameters and Daily Summer Rainfall Amount and Coverage in West-Central Florida  

Science Conference Proceedings (OSTI)

Considerable daily variations of summer convective rainfall average areal coverage and rainfall amount were identified in west-central Florida for the period May–September 1997–2000 using a 29-site rainfall network. Pearson correlation ...

Ira S. Brenner

2004-04-01T23:59:59.000Z

63

Cloud Diabatic Forcing of the Atmosphere, Estimated from Simultaneous ECMWF Diabatic Heating and ISCCP Cloud Amount Observations  

Science Conference Proceedings (OSTI)

The cloud diabatic forcing (CDF) of the atmosphere, defined as the difference between the diabatic heating in average and in clear-sky conditions is estimated from time series of simultaneous observations of diabatic heating and cloud amount. The ...

Peter Siegmund

1993-12-01T23:59:59.000Z

64

Comparison of Average Transport and Dispersion Among a Gaussian, a  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comparison of Average Transport and Dispersion Among a Gaussian, a Comparison of Average Transport and Dispersion Among a Gaussian, a Two-Dimensional, and a Three-Dimensional Model Comparison of Average Transport and Dispersion Among a Gaussian, a Two-Dimensional, and a Three-Dimensional Model The Nuclear Regulatory Commission's (NRC's) code for predicting off-site consequences, MACCS2 (Chanin, et al. 1998) (MELCOR Accident Consequence Code System, Version 2), uses a simplified model for atmospheric transport and d ispersion (ATD), that is, a straight-line Gaussian model. The MACCS2 calculations are used by the NRC for planning purposes, for cost-benefit analyses, and in level-3 probabilistic risk analyses (PRAs). The MACCS2 ATD model has been criticized as being overly simplistic, even for its purposes. The justification for its use has been

65

Analyzing the Deployment of Large Amounts of Offshore Wind to...  

NLE Websites -- All DOE Office Websites (Extended Search)

not directly capture the wear-and-tear costs associated with operating the conventional thermal power plant fleet in a more flexible fashion. Additional research on these costs...

66

Electricity Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Emissions Caps and the Impact of a Radical Change in Nuclear Electricity Costs journal International Journal of Energy Economics and Policy volume year month chapter...

67

Cost Comparison of Public Elementary School Construction Costs Based on Project Delivery System in the State of Texas  

E-Print Network (OSTI)

If a correlation exists between cost and project delivery system then this is crucial knowledge for any group organizing a new construction project. It has been observed anecdotally that the construction cost per student of public elementary schools has been observed to continue to increase in the state of Texas, even with the recent downturn in the economy. The recent economic depression in the USA has seen construction material costs stagnate and construction costs dropping. This is a direct result of the competitive nature of a market that has a lack of business. The issue of a rising cost at the time of a falling market is of more than a passing research interest to school superintendents and the people of Texas. This study investigated the relationship between cost and project delivery systems. A survey was sent to all school superintendents in Texas requesting recent data on elementary school enrollment, project delivery type and construction costs. One hundred and thirty six responses were received from one thousand and seventy six Texas school districts. A comparative means test was used to determine if a relationship exists between construction cost per student and project delivery system for public elementary schools in Texas. The research shows that Texas school districts are primarily using two types of project delivery systems for their new school construction, Construction Management at Risk and Competitive Sealed Proposals. After comparing the average construction cost per student for these two project delivery systems, the statistical analysis showed that Competitive Sealed Proposals cost approximately four thousand dollar less per student than Construction Management at Risk. The clear question is then as to why are districts using Construction Management at Risk when the comparative benefits of the contract type are not worth this amount of money per student.

Reinisch, Ashley

2011-12-01T23:59:59.000Z

68

Fatigue reliability of wind turbine fleets: The effect of uncertainty of projected costs  

DOE Green Energy (OSTI)

The cost of repairing or replacing failed components depends on the number and timing of failures. Although the total probability of individual component failure is sometimes interpreted as the percentage of components likely to fail, this perception is often far from correct. Different amounts of common versus independent uncertainty can cause different numbers of components to be at risk of failure. The FAROW tool for fatigue and reliability analysis of wind turbines makes it possible for the first time to conduct a detailed economic analysis of the effects of uncertainty on fleet costs. By dividing the uncertainty into common and independent parts, the percentage of components expected to fail in each year of operation is estimated. Costs are assigned to the failures and the yearly costs and present values are computed. If replacement cost is simply a constant multiple of the number of failures, the average, or expected cost is the same as would be calculated by multiplying by the probability of individual component failure. However, more complicated cost models require a break down of how many components are likely to fail. This break down enables the calculation of costs associated with various probability of occurrence levels, illustrating the variability in projected costs. Estimating how the numbers of components expected to fail evolves over time is also useful in calculating the present value of projected costs and in understanding the nature of the financial risk.

Veers, P.S.

1995-12-31T23:59:59.000Z

69

Optimization Online - String-Averaging Projected Subgradient ...  

E-Print Network (OSTI)

Aug 29, 2013 ... Optimization Online. String-Averaging Projected Subgradient Methods for Constrained Minimization. Yair Censor(yair ***at*** math.haifa.ac.il)

70

Average Stock Levels: Crude Market & Propane  

U.S. Energy Information Administration (EIA)

This graph shows that propane was not alone in experiencing excess supply in 1998 and extraordinary stock builds. Note that the graph shows average stock levels ...

71

Dynamic Multiscale Averaging (DMA) of Turbulent Flow  

SciTech Connect

A new approach called dynamic multiscale averaging (DMA) for computing the effects of turbulent flow is described. The new method encompasses multiple applications of temporal and spatial averaging, that is, multiscale operations. Initially, a direct numerical simulation (DNS) is performed for a relatively short time; it is envisioned that this short time should be long enough to capture several fluctuating time periods of the smallest scales. The flow field variables are subject to running time averaging during the DNS. After the relatively short time, the time-averaged variables are volume averaged onto a coarser grid. Both time and volume averaging of the describing equations generate correlations in the averaged equations. These correlations are computed from the flow field and added as source terms to the computation on the next coarser mesh. They represent coupling between the two adjacent scales. Since they are computed directly from first principles, there is no modeling involved. However, there is approximation involved in the coupling correlations as the flow field has been computed for only a relatively short time. After the time and spatial averaging operations are applied at a given stage, new computations are performed on the next coarser mesh using a larger time step. The process continues until the coarsest scale needed is reached. New correlations are created for each averaging procedure. The number of averaging operations needed is expected to be problem dependent. The new DMA approach is applied to a relatively low Reynolds number flow in a square duct segment. Time-averaged stream-wise velocity and vorticity contours from the DMA approach appear to be very similar to a full DNS for a similar flow reported in the literature. Expected symmetry for the final results is produced for the DMA method. The results obtained indicate that DMA holds significant potential in being able to accurately compute turbulent flow without modeling for practical engineering applications.

Richard W. Johnson

2012-09-01T23:59:59.000Z

72

Bayesian curve estimation by model averaging  

Science Conference Proceedings (OSTI)

A Bayesian approach is used to estimate a nonparametric regression model. The main features of the procedure are, first, the functional form of the curve is approximated by a mixture of local polynomials by Bayesian model averaging (BMA), second, the ... Keywords: BIC criterion, Bayesian model averaging, Local polynomial regression, Nonparametric curve fitting, Robustness

Daniel Peña; Dolores Redondas

2006-02-01T23:59:59.000Z

73

Property:SalinityAverage | Open Energy Information  

Open Energy Info (EERE)

SalinityAverage SalinityAverage Jump to: navigation, search Property Name SalinityAverage Property Type Number Description Mean average of the low and high end measurements of the salinity [ppm] of the fluid. This is a property of type Page. Subproperties This property has the following 1 subproperty: C Coso Geothermal Area Pages using the property "SalinityAverage" Showing 19 pages using this property. A Amedee Geothermal Area + 975 + B Beowawe Hot Springs Geothermal Area + 700 + Blue Mountain Geothermal Area + 4300 + Brady Hot Springs Geothermal Area + 3500 + C Chena Geothermal Area + 325 + D Desert Peak Geothermal Area + 6700 + Dixie Valley Geothermal Area + 2295 + E East Mesa Geothermal Area + 3750 + G Geysers Geothermal Area + 217 + K Kilauea East Rift Geothermal Area + 18750 +

74

Determination of Total Ozone Amount from TIROS Radiance Measurements  

Science Conference Proceedings (OSTI)

Total ozone amounts are determined from atmospheric radiances measured by the TIROS Operational Vertical Sounder (TOVS). The retrieval procedure is one of linear regression where total ozone amounts derived from Dobson spectrophotometer ...

Walter G. Planet; David S. Crosby; James H. Lienesch; Michael L. Hill

1984-02-01T23:59:59.000Z

75

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining the equipment for reclamation? Types of Costs #12;· Marginal Cost: ­ Change in total cost ­ Any production process involves fixed and variable costs. As production increases/expands, fixed costs are unchanged, so

Boisvert, Jeff

76

Lagged Average Predictions in a Predictability Experiment  

Science Conference Proceedings (OSTI)

Lagged average predictions are examined here within the context of an idealized predictability experiment. Lagged predictions contribute to making better forecasts than the forecasts obtained from using only the latest initial state. Analytic ...

John O. Roads

1988-01-01T23:59:59.000Z

77

Probabilistic Visibility Forecasting Using Bayesian Model Averaging  

Science Conference Proceedings (OSTI)

Bayesian model averaging (BMA) is a statistical postprocessing technique that has been used in probabilistic weather forecasting to calibrate forecast ensembles and generate predictive probability density functions (PDFs) for weather quantities. ...

Richard M. Chmielecki; Adrian E. Raftery

2011-05-01T23:59:59.000Z

78

average air temperature | OpenEI  

Open Energy Info (EERE)

average air temperature average air temperature Dataset Summary Description (Abstract): Air Temperature at 10 m Above The Surface Of The Earth (deg C)NASA Surface meteorology and Solar Energy (SSE) Release 6.0 Data Set (Nov 2007)22-year Monthly & Annual Average (July 1983 - June 2005)Parameter: Air Temperature at 10 m Above The Surface Of The Earth (deg C)Internet: http://eosweb.larc.nasa.gov/sse/Note 1: SSE Methodology & Accuracy sections onlineNote 2: Lat/Lon values indicate the lower left corner of a 1x1 degree region. Negative values are south and west; Source U.S. National Aeronautics and Space Administration (NASA), Surface meteorology and Solar Energy (SSE) Date Released March 31st, 2009 (5 years ago) Date Updated April 01st, 2009 (5 years ago) Keywords average air temperature

79

The Shape of Averaged Drop Size Distributions  

Science Conference Proceedings (OSTI)

The shape of averaged drop size distributions (DSD) is studied from a large sample of data (892 h) collected at several sites of various latitudes. The results show that neither the hypothesis of an exponential distribution to represent rainfall ...

Henri Sauvageot; Jean-Pierre Lacaux

1995-04-01T23:59:59.000Z

80

Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (after 24-May 2010 06:00):" Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (after 24-May 2010 06:00):" ,,"Choke","Average","Average","Fluid","Methanol","Water","Oil","Gas","Hyd. Eq.","Gas" ,"Choke","Setting","Upstream","Upstream","Recovery","Recovery","Recovery","Recovery","Recovery","Recovery","Recovery" "Date and Time","Setting","Duration","Pressure","Temp.","Rate","Rate","Rate","Rate","Rate","Rate","Portion" "dd-mmm-yy","(64ths)","(hours)","(psia)","(degF)","(bfpd)","(bfpd)","(bwpd)","(bopd)","(mmcfpd)","(boepd)","(%)"

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

A high average power pockels cell  

DOE Patents (OSTI)

A high average power pockels cell is disclosed which reduced the effect of thermally induced strains in high average power laser technology. The pockels cell includes an elongated, substantially rectangular crystalline structure formed from a KDP-type material to eliminate shear strains. The X- and Y-axes are oriented substantially perpendicular to the edges of the crystal cross-section and to the C-axis direction of propagation to eliminate shear strains.

Daly, T.P.

1986-02-10T23:59:59.000Z

82

Average transmission probability of a random stack  

E-Print Network (OSTI)

The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

Yin Lu; Christian Miniatura; Berthold-Georg Englert

2009-07-31T23:59:59.000Z

83

Estimating production and cost for clamshell mechanical dredges  

E-Print Network (OSTI)

Clamshell dredges are used around the United States for both navigational and environmental dredging projects. Clamshell dredges are extremely mobile and can excavate sediment over a wide range of depths. The object of this thesis is to develop a methodology for production and cost estimation for clamshell dredge projects. There are current methods of predicting clamshell dredge production which rely on production curves and constant cycle times. This thesis calculates production estimation by predicting cycle time which is the time required to complete one dredge cycle. By varying the cycle time according to site characteristics production can be predicted. A second important component to predicting clamshell dredge production is bucket fill factor. This is the percent of the bucket that will fill with sediment depending on the type of soil being excavated. Using cycle time as the basis for production calculation a spreadsheet has been created to simplify the calculation of production and project cost. The production calculation also factors in soil type and region of the United States. The spreadsheet is capable of operating with basic site characteristics, or with details about the dredge, bucket size, and region. Once the production is calculated the project cost can be determined. First the project length is found by dividing the total amount of sediment that is to be excavated by the production rate. Once the project length is calculated the remainder of the project cost can be found. The methods discussed in this thesis were used to calculate project cost for 5 different projects. The results were then compared to estimates by the government and the actual cost of the project. The government estimates were an average of 39% higher than the actual project cost. The method discussed in this thesis was only 6% higher than the actual cost.

Adair, Robert Fletcher

2004-12-01T23:59:59.000Z

84

Estimating Averaging Times for Point and Path-Averaged Measurements of Turbulence Spectra  

Science Conference Proceedings (OSTI)

Uncertainty over how long to average turbulence variables to achieve some desired level of statistical stability is a common concern in boundary-layer meteorology. Several models exist that predict averaging times for measurements of variances ...

Edgar L. Andreas

1988-03-01T23:59:59.000Z

85

National Energy and Cost Savings for New Single- and Multifamily Homes: A Comparison of the 2006, 2009, and 2012 Editions of the IECC  

SciTech Connect

The 2009 and 2012 International Energy Conservation Code (IECC) yield positive benefits for U.S. homeowners and significant energy savings for the nation. Moving from a baseline of the 2006 IECC to the 2009 IECC reduces average annual energy costs by 10.8%, while moving from the same baseline to the 2012 IECC reduces them by 32.1%. These reductions amount to annual energy cost savings of $168 and $497, respectively. The 2012 IECC saves $329 in energy costs compared to the 2009 IECC.

Lucas, Robert G.; Taylor, Zachary T.; Mendon, Vrushali V.; Goel, Supriya

2012-04-01T23:59:59.000Z

86

Cost and production estimation for a cutter suction dredge  

E-Print Network (OSTI)

The need for accurate cost estimates is well recognized in the dredging industry. In order for a dredging contractor to efficiently execute a project from its conception to its completion, an accurate estimate of the final cost is imperative. The most practical method of determining the cost is through the use of a computer program, based on the capability of personal computers to manipulate large amounts of data and perform difficult calculations without error. Development of such a program requires both theoretical and practical knowledge of the dredging process. There are several existing cost estimation and production estimation programs in use in the dredging industry today. Several different algorithms to estimate production have been developed over the years, and there are some non-proprietary production programs. However, the majority of both cost and production estimation programs are proprietary and therefore not available to those apart from the individual company. Therefore, the need exists for a program of this type which can be made available to the general public. This report discusses the development of a new generalized cost and production estimation program. Both slurry transport theory and centrifugal pump theory are incorporated into the production component of the program. This is necessary to obtain an accurate production estimate in the absence of a great deal of data for a specific dredge. Practical knowledge of costs associated with the dredging process is applied in the cost estimation component. The gram is written in the Quattropro(version6.01)spread sheet formatand may be used in conjunction with Microsoft Windows version 3.1 or Windows95. The acronym CSDCEP has been given to the program, which stands for Cutter detailing the operation of the program is available. The cost estimate results produced by CSDCEP were compared with actual data and government cost estimates for twenty one completed projects. The average difference between the estimate and the actual costs was twenty four percent. CSDCEP is a generalized cost estimating program that yields a good approximation of the final dredging cost.

Miertschin, Michael Wayne

1997-01-01T23:59:59.000Z

87

Hydrogen demand, production, and cost by region to 2050.  

DOE Green Energy (OSTI)

This report presents an analysis of potential hydrogen (H{sub 2}) demand, production, and cost by region to 2050. The analysis was conducted to (1) address the Energy Information Administration's (EIA's) request for regional H{sub 2} cost estimates that will be input to its energy modeling system and (2) identify key regional issues associated with the use of H{sub 2} that need further study. Hydrogen costs may vary substantially by region. Many feedstocks may be used to produce H{sub 2}, and the use of these feedstocks is likely to vary by region. For the same feedstock, regional variation exists in capital and energy costs. Furthermore, delivery costs are likely to vary by region: some regions are more rural than others, and so delivery costs will be higher. However, to date, efforts to comprehensively and consistently estimate future H{sub 2} costs have not yet assessed regional variation in these costs. To develop the regional cost estimates and identify regional issues requiring further study, we developed a H{sub 2} demand scenario (called 'Go Your Own Way' [GYOW]) that reflects fuel cell vehicle (FCV) market success to 2050 and allocated H{sub 2} demand by region and within regions by metropolitan versus non-metropolitan areas. Because we lacked regional resource supply curves to develop our H{sub 2} production estimates, we instead developed regional H{sub 2} production estimates by feedstock by (1) evaluating region-specific resource availability for centralized production of H{sub 2} and (2) estimating the amount of FCV travel in the nonmetropolitan areas of each region that might need to be served by distributed production of H{sub 2}. Using a comprehensive H{sub 2} cost analysis developed by SFA Pacific, Inc., as a starting point, we then developed cost estimates for each H{sub 2} production and delivery method by region and over time (SFA Pacific, Inc. 2002). We assumed technological improvements over time to 2050 and regional variation in energy and capital costs. Although we estimate substantial reductions in H{sub 2} costs over time, our cost estimates are generally higher than the cost goals of the U.S. Department of Energy's (DOE's) hydrogen program. The result of our analysis, in particular, demonstrates that there may be substantial variation in H{sub 2} costs between regions: as much as $2.04/gallon gasoline equivalent (GGE) by the time FCVs make up one-half of all light-vehicle sales in the GYOW scenario (2035-2040) and $1.85/GGE by 2050 (excluding Alaska). Given the assumptions we have made, our analysis also shows that there could be as much as a $4.82/GGE difference in H{sub 2} cost between metropolitan and non-metropolitan areas by 2050 (national average). Our national average cost estimate by 2050 is $3.68/GGE, but the average H{sub 2} cost in metropolitan areas in that year is $2.55/GGE and that in non-metropolitan areas is $7.37/GGE. For these estimates, we assume that the use of natural gas to produce H{sub 2} is phased out. This phase-out reflects the desire of DOE's Office of Hydrogen, Fuel Cells and Infrastructure Technologies (OHFCIT) to eliminate reliance on natural gas for H{sub 2} production. We conducted a sensitivity run in which we allowed natural gas to continue to be used through 2050 for distributed production of H{sub 2} to see what effect changing that assumption had on costs. In effect, natural gas is used for 66% of all distributed production of H{sub 2} in this run. The national average cost is reduced to $3.10/GGE, and the cost in non-metropolitan areas is reduced from $7.37/GGE to $4.90, thereby reducing the difference between metropolitan and non-metropolitan areas to $2.35/GGE. Although the cost difference is reduced, it is still substantial. Regional differences are similarly reduced, but they also remain substantial. We also conducted a sensitivity run in which we cut in half our estimate of the cost of distributed production of H{sub 2} from electrolysis (our highest-cost production method). In this run, our national average cost estimate is reduced even further, to

Singh, M.; Moore, J.; Shadis, W.; Energy Systems; TA Engineering, Inc.

2005-10-31T23:59:59.000Z

88

Hydrogen demand, production, and cost by region to 2050.  

SciTech Connect

This report presents an analysis of potential hydrogen (H{sub 2}) demand, production, and cost by region to 2050. The analysis was conducted to (1) address the Energy Information Administration's (EIA's) request for regional H{sub 2} cost estimates that will be input to its energy modeling system and (2) identify key regional issues associated with the use of H{sub 2} that need further study. Hydrogen costs may vary substantially by region. Many feedstocks may be used to produce H{sub 2}, and the use of these feedstocks is likely to vary by region. For the same feedstock, regional variation exists in capital and energy costs. Furthermore, delivery costs are likely to vary by region: some regions are more rural than others, and so delivery costs will be higher. However, to date, efforts to comprehensively and consistently estimate future H{sub 2} costs have not yet assessed regional variation in these costs. To develop the regional cost estimates and identify regional issues requiring further study, we developed a H{sub 2} demand scenario (called 'Go Your Own Way' [GYOW]) that reflects fuel cell vehicle (FCV) market success to 2050 and allocated H{sub 2} demand by region and within regions by metropolitan versus non-metropolitan areas. Because we lacked regional resource supply curves to develop our H{sub 2} production estimates, we instead developed regional H{sub 2} production estimates by feedstock by (1) evaluating region-specific resource availability for centralized production of H{sub 2} and (2) estimating the amount of FCV travel in the nonmetropolitan areas of each region that might need to be served by distributed production of H{sub 2}. Using a comprehensive H{sub 2} cost analysis developed by SFA Pacific, Inc., as a starting point, we then developed cost estimates for each H{sub 2} production and delivery method by region and over time (SFA Pacific, Inc. 2002). We assumed technological improvements over time to 2050 and regional variation in energy and capital costs. Although we estimate substantial reductions in H{sub 2} costs over time, our cost estimates are generally higher than the cost goals of the U.S. Department of Energy's (DOE's) hydrogen program. The result of our analysis, in particular, demonstrates that there may be substantial variation in H{sub 2} costs between regions: as much as $2.04/gallon gasoline equivalent (GGE) by the time FCVs make up one-half of all light-vehicle sales in the GYOW scenario (2035-2040) and $1.85/GGE by 2050 (excluding Alaska). Given the assumptions we have made, our analysis also shows that there could be as much as a $4.82/GGE difference in H{sub 2} cost between metropolitan and non-metropolitan areas by 2050 (national average). Our national average cost estimate by 2050 is $3.68/GGE, but the average H{sub 2} cost in metropolitan areas in that year is $2.55/GGE and that in non-metropolitan areas is $7.37/GGE. For these estimates, we assume that the use of natural gas to produce H{sub 2} is phased out. This phase-out reflects the desire of DOE's Office of Hydrogen, Fuel Cells and Infrastructure Technologies (OHFCIT) to eliminate reliance on natural gas for H{sub 2} production. We conducted a sensitivity run in which we allowed natural gas to continue to be used through 2050 for distributed production of H{sub 2} to see what effect changing that assumption had on costs. In effect, natural gas is used for 66% of all distributed production of H{sub 2} in this run. The national average cost is reduced to $3.10/GGE, and the cost in non-metropolitan areas is reduced from $7.37/GGE to $4.90, thereby reducing the difference between metropolitan and non-metropolitan areas to $2.35/GGE. Although the cost difference is reduced, it is still substantial. Regional differences are similarly reduced, but they also remain substantial. We also conducted a sensitivity run in which we cut in half our estimate of the cost of distributed production of H{sub 2} from electrolysis (our highest-cost production method). In this run, our national average cost es

Singh, M.; Moore, J.; Shadis, W.; Energy Systems; TA Engineering, Inc.

2005-10-31T23:59:59.000Z

89

Physical Education Building Building Room Material Amount Percentage Priority Action  

E-Print Network (OSTI)

Physical Education Building Building Room Material Amount Percentage Priority Action Phys Ed Level Mechanical Insulation 250 LF 70.00 P6 Manage Phys Ed Level 1 East PE1H2 Pipe Fitting Mud 6 each 85.00 P5 #12;Building Room Material Amount Percentage Priority Action Phys Ed Level 2 West PE200 Pipe Fitting

Seldin, Jonathan P.

90

Service Building 4 Building Room Material Amount Percentage Priority Action  

E-Print Network (OSTI)

Service Building 4 Building Room Material Amount Percentage Priority Action Service Building 4 S160 65 sqft 15.00 P5 Manage S1J74 Friday, February 18, 2011 Page 1 of 2 #12;Building Room Material Amount Manage Mechanical Insulation 100 LF 55.00 P5 Manage Service Buliding 4 S16H6A Gypsum Wallboard Joint

Seldin, Jonathan P.

91

World average top-quark mass  

SciTech Connect

This paper summarizes a talk given at the Top2008 Workshop at La Biodola, Isola d Elba, Italy. The status of the world average top-quark mass is discussed. Some comments about the challanges facing the experiments in order to further improve the precision are offered.

Glenzinski, D.; /Fermilab

2008-01-01T23:59:59.000Z

92

STAFF FORECAST: AVERAGE RETAIL ELECTRICITY PRICES  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STAFF FORECAST: AVERAGE RETAIL ELECTRICITY PRICES 2005 TO 2018 report, Staff Forecast: Retail Electricity Prices, 2005 to 2018, was prepared with contributions from the technical assistance provided by Greg Broeking of R.W. Beck, Inc. in preparing retail price forecasts

93

Exact bounds for average pairwise network reliability  

Science Conference Proceedings (OSTI)

Several methods for finding exact bounds of average pairwise network connectivity (APNC) are proposed. These methods allows faster decision making about if a network is reliable for its purpose. Previous results on cumulitive updating of all-terminal ... Keywords: algorithm, network reliability, pairwise connectivity

Alexey Rodionov; Olga Rodionova

2013-01-01T23:59:59.000Z

94

Sources Of Average Individual Radiation Exposure  

NLE Websites -- All DOE Office Websites (Extended Search)

Of Average Individual Radiation Exposure Of Average Individual Radiation Exposure Natural background Medical Consumer products Industrial, security, educational and research Occupational 0.311 rem 0.300 rem 0.013 rem 0.0003 rem 0.0005 rem Savannah River Nuclear Solutions, LLC, provides radiological protection services and oversight at the Savannah River Site (SRS). These services include radiation dose measurements for persons who enter areas where they may be exposed to radiation or radioactive material. The results are periodically reported to monitored individuals. The results listed are based on a radiation dose system developed by the International Commission on Radiation Protection. The system uses the terms "effective dose," "equivalent dose" and units of rem. You may be more familiar with the term "millirem" (mrem), which is 1/1000 of a rem.

95

Fat turnover in obese slower than average  

NLE Websites -- All DOE Office Websites (Extended Search)

9-04 9-04 For immediate release: 09/23/2011 | NR-11-09-04 Fat turnover in obese slower than average Anne M Stark, LLNL, (925) 422-9799, stark8@llnl.gov Printer-friendly This scanning electron micrograph image shows part of a lobule of adipose tissue (body fat). Adipose tissue is specialized connective tissue that functions as the major storage site for fat. Photo courtesy of David Gregory & Debbie Marshall/Wellcome Images LIVERMORE, Calif. -- It may be more difficult for obese people to lose fat because the "turnover" rate is much slower for those overweight than average weight individuals. New research in the Sept. 25 online edition of the journal Nature shows that the turnover (storage and loss rate) of fat in the human body is about 1 1/2 years compared to fat cells, which turnover about every 10 years,

96

Natural Gas Prices: Well Above Recent Averages  

Gasoline and Diesel Fuel Update (EIA)

5 5 Notes: The recent surge in spot prices at the Henry Hub are well above a typical range for 1998-1999 (in this context, defined as the average, +/- 2 standard deviations). Past price surges have been of short duration. The possibility of a downward price adjustment before the end of next winter is a source of considerable risk for storage operators who acquire gas at recent elevated prices. Storage levels in the Lower 48 States were 7.5 percent below the 5-year average (1995-1999) by mid-August (August 11), although the differential is only 6.4 percent in the East, which depends most heavily on storage to meet peak demand. Low storage levels are attributable, at least in part, to poor price incentives: high current prices combined with only small price

97

HIGH AVERAGE POWER OPTICAL FEL AMPLIFIERS.  

SciTech Connect

Historically, the first demonstration of the optical FEL was in an amplifier configuration at Stanford University [l]. There were other notable instances of amplifying a seed laser, such as the LLNL PALADIN amplifier [2] and the BNL ATF High-Gain Harmonic Generation FEL [3]. However, for the most part FELs are operated as oscillators or self amplified spontaneous emission devices. Yet, in wavelength regimes where a conventional laser seed can be used, the FEL can be used as an amplifier. One promising application is for very high average power generation, for instance FEL's with average power of 100 kW or more. The high electron beam power, high brightness and high efficiency that can be achieved with photoinjectors and superconducting Energy Recovery Linacs (ERL) combine well with the high-gain FEL amplifier to produce unprecedented average power FELs. This combination has a number of advantages. In particular, we show that for a given FEL power, an FEL amplifier can introduce lower energy spread in the beam as compared to a traditional oscillator. This properly gives the ERL based FEL amplifier a great wall-plug to optical power efficiency advantage. The optics for an amplifier is simple and compact. In addition to the general features of the high average power FEL amplifier, we will look at a 100 kW class FEL amplifier is being designed to operate on the 0.5 ampere Energy Recovery Linac which is under construction at Brookhaven National Laboratory's Collider-Accelerator Department.

BEN-ZVI, ILAN, DAYRAN, D.; LITVINENKO, V.

2005-08-21T23:59:59.000Z

98

Improved performance of high average power semiconductor arrays for applications in diode pumped solid state lasers  

Science Conference Proceedings (OSTI)

The average power performance capability of semiconductor diode laser arrays has improved dramatically over the past several years. These performance improvements, combined with cost reductions pursued by LLNL and others in the fabrication and packaging of diode lasers, have continued to reduce the price per average watt of laser diode radiation. Presently, we are at the point where the manufacturers of commercial high average power solid state laser systems used in material processing applications can now seriously consider the replacement of their flashlamp pumps with laser diode pump sources. Additionally, a low cost technique developed and demonstrated at LLNL for optically conditioning the output radiation of diode laser arrays has enabled a new and scalable average power diode-end-pumping architecture that can be simply implemented in diode pumped solid state laser systems (DPSSL`s). This development allows the high average power DPSSL designer to look beyond the Nd ion for the first time. Along with high average power DPSSL`s which are appropriate for material processing applications, low and intermediate average power DPSSL`s are now realizable at low enough costs to be attractive for use in many medical, electronic, and lithographic applications.

Beach, R.; Emanuel, M.; Benett, W.; Freitas, B.; Ciarlo, D.; Carlson, N.; Sutton, S.; Skidmore, J.; Solarz, R.

1994-01-01T23:59:59.000Z

99

Reducing the cost of top-drive installation  

Science Conference Proceedings (OSTI)

To equip an older jackup, the Offshore Mercury, with a completely workable and reliable top drive at minimum cost and without sacrificing performance, Sonat Offshore Drilling installed a power-swivel drilling system that did not require heightening or strengthening the derrick. An electronic crown protection system was installed to allow the driller use of all available reduced crown clearance, thereby increasing drilling safety by reducing the probability of accidentally running the traveling block into the crown. In addition, they modified the DC-DC drilling power equipment to create a completely functional and low-cost alternative to installing additional AC power-generating capacity and an SCR system. When planning a cost-effective top-drive installation on the Offshore Mercury, they recognized that the rig did not fit the average jackup profile: It has a DC-DC electric power drilling system and only a 140-ft (43-m) derrick, rather than the more common SCR system and 147-ft (45-m) derrick. From costs studies made up to the middle of 1991, they believed they could save a significant amount if it were possible to install and use a top drive in a 147-ft (45-m) or even a 140-ft (43-m) derrick without having to extend and strengthen the derrick. This paper reviews the design of this system and the effectiveness of its performance.

Hock, C.J. (Sonat Offshore Drilling Inc., Houston, TX (United States))

1993-09-01T23:59:59.000Z

100

Drilling costs drop 7% in 1985  

SciTech Connect

Drilling costs dropped about 7% last year. This decline cancels a slight increase in 1984. Total costs to drill now run about 59% of the 1981 highs. Comparable figures for the previous 2 years are 63 and 61%. Deeper wells showed the biggest drops. Shallow well costs fell about 6%. Energy Information Administration (EIA) indexes drilling costs on a 1976 base year. Costs for shallow wells (5,000 ft or less) show an index about 138. Deeper wells have an index around 149. Cost declines were the greatest in West and North Texas and the Rockies, of 11%. The Northeast and Western areas showed greater than average declines, 9% or so. The High Plains, New Mexico, and Midcontinent areas recorded near the average 7% decline. Costs in South Louisiana, the Southeast, and Ark-La-Tex 2%. West Central Texas costs were off only 1%. The Southeast was essentially unchanged. Indexes by area show generally that drilling costs have declined since 1983. The summary here comes from EIA's ''Indexes and Estimates of Domestic Well Drilling Costs 1984 and 1985''. That report covers oil, gas, and dry hole costs, cost components, and overall costs.

Anderson, T.; Funk, V.

1986-03-24T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

On the Conditional Distribution of Daily Precipitation Amounts  

Science Conference Proceedings (OSTI)

Possible conditional dependence of the distribution of daily precipitation amounts on the occurrence of precipitation on the preceding day is examined. Test results based on 25 years of data at 30 stations in the conterminous United States show ...

Edwin H. Chin; John F. Miller

1980-09-01T23:59:59.000Z

102

Los Alamos Employees' Scholarship Fund raises record amount  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos Employees' Scholarship Fund raises record amount Los Alamos Employees' Scholarship Fund raises record amount Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Los Alamos Employees' Scholarship Fund raises record amount $555,625 will fund regional students' post-secondary education July 1, 2013 Students from Valarde Middle School won the video competition in the Best in Show and Middle School categories. They are shown here with sixth-grade teacher Jimmy Lara. Lab Director Charlie McMillan throws out the first pitch at an Isotopes game that helped raise funds for Los Alamos National Laboratory Foundation scholarship program Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Los Alamos Employees' Scholarship Fund raises record amount

103

Automatic Monitoring of the Amount of Deposited Precipitation  

Science Conference Proceedings (OSTI)

An automatic device for measurement of the amount (weight) of deposited precipitation developed at the Institute of Atmospheric Physics, Academy of Sciences of the Czech Republic, is described. Examples of measurements of various types of ...

J. Fišák; J. Chum; J. Vojta; K. Bart??ková

2013-04-01T23:59:59.000Z

104

Automatic Estimation of Cloud Amount Using Computer Vision  

Science Conference Proceedings (OSTI)

A study was carried out to establish the feasibility of using computer vision to estimate cloud amount. Various techniques were investigated and optimum diagnostic parameters derived. These were then applied to a number of images representing a ...

Gordon B. Davis; David J. Griggs; Geoffrey D. Sullivan

1992-02-01T23:59:59.000Z

105

Oil and Gas Lease Equipment and Operating Costs 1994 Through...  

Gasoline and Diesel Fuel Update (EIA)

cost reported here could be higher than the actual annual average for 2008. However, some production costs (labor and equipment) are not as volatile as drilling, pipe, and other...

106

Federal Energy Management Program: Energy Cost Calculator for...  

NLE Websites -- All DOE Office Websites (Extended Search)

8000 hours Number of lamps in retrofit project Hours operating per week hours Average cost of electricity 0.06 kWh Relamper labor costs hr Time taken to retrofit all lamps...

107

Measurement strategies for estimating long-term average wind speeds  

DOE Green Energy (OSTI)

The uncertainty and bias in estimates of long-term average wind speeds inherent in continuous and intermittent measurement strategies are examined by simulating the application of the strategies to 40 data sets. Continuous strategies have smaller uncertainties for fixed duration measurement programs, but intermittent strategies make more efficient use of instruments and have smaller uncertainties for a fixed amount of instrument use. Continuous strategies tend to give biased estimates of the long-term annual mean speed unless an integral number of years' data is collected or the measurement program exceeds 3 years in duration. Intermittent strategies with three or more month-long measurement periods per year do not show any tendency toward bias.

Ramsdell, J.V.; Houston, S.; Wegley, H.L.

1980-10-01T23:59:59.000Z

108

Impact Ionization Model Using Average Energy and Average Square Energy of Distribution Function  

E-Print Network (OSTI)

Impact Ionization Model Using Average Energy and Average Square Energy of Distribution Function Ken relaxation length, v sat ø h''i (¸ 0:05¯m), the energy distribution function is not well described calculation of impact ionization coefficient requires the use of a high energy distribution function because

Dunham, Scott

109

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408) costs apply to those items that are consumed in production process and are roughly proportional to level in cash flow analysis and in the decision to use the equipment for reclamation? Types of Costs #12

Boisvert, Jeff

110

Average Price of Natural Gas Production  

Gasoline and Diesel Fuel Update (EIA)

. . Quantity and Average Price of Natural Gas Production in the United States, 1930-1996 (Volumes in Million Cubic Feet, Prices in Dollars per Thousand Cubic Feet) Table Year Gross Withdrawals Used for Repressuring Nonhydro- carbon Gases Removed Vented and Flared Marketed Production Extraction Loss Dry Production Average Wellhead Price of Marketed Production 1930 ....................... NA NA NA NA 1,978,911 75,140 1,903,771 0.08 1931 ....................... NA NA NA NA 1,721,902 62,288 1,659,614 0.07 1932 ....................... NA NA NA NA 1,593,798 51,816 1,541,982 0.06 1933 ....................... NA NA NA NA 1,596,673 48,280 1,548,393 0.06 1934 ....................... NA NA NA NA 1,815,796 52,190 1,763,606 0.06 1935 ....................... NA NA NA NA 1,968,963 55,488 1,913,475 0.06 1936 ....................... 2,691,512 73,507 NA 392,528 2,225,477

111

Average values and dispersion (in parentheses)  

NLE Websites -- All DOE Office Websites (Extended Search)

Average values and dispersion (in parentheses) Average values and dispersion (in parentheses) Base-pair Parameters --------------------------------------------------------------------------------------- Shear Stretch Stagger Buckle Propeller Opening 3DNA A 0.01(0.23) -0.18(0.10) 0.02(0.25) -0.13(7.77) -11.79(4.14) 0.57(2.80) B 0.00(0.21) -0.15(0.12) 0.09(0.19) 0.53(6.74) -11.35(5.26) 0.63(3.05) CEHS A 0.01(0.23) -0.18(0.10) 0.02(0.25) -0.13(7.75) -11.82(4.14) 0.56(2.78) B 0.00(0.21) -0.14(0.12) 0.09(0.19) 0.53(6.73) -11.37(5.27) 0.62(3.03) CompDNA A 0.01(0.23) -0.18(0.10) 0.02(0.25) -0.12(7.70) -11.81(4.14) 0.56(2.79) B 0.00(0.21) -0.15(0.12) 0.09(0.19) 0.53(6.70) -11.37(5.26) 0.62(3.03) Curves A 0.01(0.23) -0.18(0.10) 0.02(0.25) -0.13(7.85) -11.76(4.12) 0.57(2.80)

112

Sample Invoice Cost Share UT-B Contracts Div August 2009  

E-Print Network (OSTI)

SHIPPED VIA CUSTOMER NUMBER TERMS NET DAYS COST ELEMENT DESCRIPTION CURRENT COSTS CUMULATIVE COSTS DIRECT for the Department of Energy COMMENTS OR SPECIAL INSTRUCTIONS: SUBCONTRACT NUMBER BILLING PERIOD Begin/End Date AMOUNT PREVIOUSLY PAID TOTAL COST INCURRED COMPANY COST SHARE * SELLERS COST SHARE * TOTAL INVOICED *If

113

Hanford Site Treating Record Amount of Contaminated Groundwater |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Site Treating Record Amount of Contaminated Groundwater Hanford Site Treating Record Amount of Contaminated Groundwater Hanford Site Treating Record Amount of Contaminated Groundwater July 15, 2013 - 12:00pm Addthis Media Contacts Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov Tania Reyes, CHPRC (509) 373-6828 Tania_Reyes@rl.gov Department of Energy goal for fiscal year 2013 met early Note: Photos and graphics are available for downloading on our website link: http://ow.ly/mO5cT RICHLAND, Wash. - U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M HILL) has exceeded this year's goal for treating 1.4 billion gallons of contaminated groundwater at the Hanford Site in Washington state. "In the last few years, DOE built three new groundwater treatment facilities, and now we are seeing the results," said Briant Charboneau,

114

Hanford Site Treating Record Amount of Contaminated Groundwater |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Treating Record Amount of Contaminated Groundwater Treating Record Amount of Contaminated Groundwater Hanford Site Treating Record Amount of Contaminated Groundwater July 15, 2013 - 12:00pm Addthis Media Contacts Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov Tania Reyes, CHPRC (509) 373-6828 Tania_Reyes@rl.gov Department of Energy goal for fiscal year 2013 met early Note: Photos and graphics are available for downloading on our website link: http://ow.ly/mO5cT RICHLAND, Wash. - U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M HILL) has exceeded this year's goal for treating 1.4 billion gallons of contaminated groundwater at the Hanford Site in Washington state. "In the last few years, DOE built three new groundwater treatment facilities, and now we are seeing the results," said Briant Charboneau,

115

Locally Calibrated Probabilistic Temperature Forecasting Using Geostatistical Model Averaging and Local Bayesian Model Averaging  

Science Conference Proceedings (OSTI)

The authors introduce two ways to produce locally calibrated grid-based probabilistic forecasts of temperature. Both start from the Global Bayesian model averaging (Global BMA) statistical postprocessing method, which has constant predictive bias ...

William Kleiber; Adrian E. Raftery; Jeffrey Baars; Tilmann Gneiting; Clifford F. Mass; Eric Grimit

2011-08-01T23:59:59.000Z

116

Geographic Gossip: Efficient Averaging for Sensor Networks  

E-Print Network (OSTI)

Gossip algorithms for distributed computation are attractive due to their simplicity, distributed nature, and robustness in noisy and uncertain environments. However, using standard gossip algorithms can lead to a significant waste in energy by repeatedly recirculating redundant information. For realistic sensor network model topologies like grids and random geometric graphs, the inefficiency of gossip schemes is related to the slow mixing times of random walks on the communication graph. We propose and analyze an alternative gossiping scheme that exploits geographic information. By utilizing geographic routing combined with a simple resampling method, we demonstrate substantial gains over previously proposed gossip protocols. For regular graphs such as the ring or grid, our algorithm improves standard gossip by factors of $n$ and $\\sqrt{n}$ respectively. For the more challenging case of random geometric graphs, our algorithm computes the true average to accuracy $\\epsilon$ using $O(\\frac{n^{1.5}}{\\sqrt{\\log ...

Dimakis, Alexandros G; Wainwright, Martin J

2007-01-01T23:59:59.000Z

117

Solar: monthly and annual average latitude tilt GIS data at 40km resolution  

Open Energy Info (EERE)

Ghana from NREL Ghana from NREL Dataset Summary Description (Abstract): Monthly Average Solar Resource for flat-plate collectors tilted at latitude for Ghana. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to a flat plate collector, such as a photovoltaic panel, oriented horizontally. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to

118

PAFC Cost Challenges  

NLE Websites -- All DOE Office Websites (Extended Search)

PAFC Cost Challenges Sridhar Kanuri Manager, PAFC Technology *Sridhar.Kanuri@utcpower.com 2 AGENDA Purecell 400 cost challenge Cost reduction opportunities Summary 3 PURECELL ...

119

Minimum Changeover Cost Arborescence  

E-Print Network (OSTI)

having minimum changeover cost, a cost that we now describe. ... We define the changeover cost at j, denoted by d(j), as the sum of the costs at j paid for each of  ...

120

Energy Cost Reduction Measures Identified for Texas State Agencies  

E-Print Network (OSTI)

According t o energy auditors, state-owned facilities in Texas on the average consume over twice the energy of comparable facilities in the private sector. In 1984 and 1986 as part of the Texas Energy Cost Containment Program, two extensive energy audit programs examined a total of 35.3 million square feet of state-owned space. Energy cost reduction measures with paybacks of four years or less were identified. The purpose of this paper is to present the projects identified in 1986. Most relate to lighting, HVAC, and energy management systems. The type of facilities audited include colleges and universities, health science centers, state schools and centers, hospitals, and office buildings. The relation between the facility type and the energy cost reduction measures identified is discussed. In addition, the energy and dollar savings derived from the identified measures at the different facilities are presented. The total savings of the projects identified in both energy audit programs amount to $23.7 million annually.

Grigg, T. J.; Verdict, M. E.

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Entanglement Cost of Nonlocal Measurements  

E-Print Network (OSTI)

For certain joint measurements on a pair of spatially separated particles, we ask how much entanglement is needed to carry out the measurement exactly. For a class of orthogonal measurements on two qubits with partially entangled eigenstates, we present upper and lower bounds on the entanglement cost. The upper bound is based on a recent result by D. Berry [Phys. Rev. A 75, 032349 (2007)]. The lower bound, based on the entanglement production capacity of the measurement, implies that for almost all measurements in the class we consider, the entanglement required to perform the measurement is strictly greater than the average entanglement of its eigenstates. On the other hand, we show that for any complete measurement in d x d dimensions that is invariant under all local Pauli operations, the cost of the measurement is exactly equal to the average entanglement of the states associated with the outcomes.

Somshubhro Bandyopadhyay; Gilles Brassard; Shelby Kimmel; William K. Wootters

2008-09-12T23:59:59.000Z

122

Building a market for small wind: The break-even turnkey cost of residential wind systems in the United States  

E-Print Network (OSTI)

higher average state electricity rates, which increase thethe average state retail electricity rate, meaning thatsensitivities on state retail electricity rates, O&M costs,

Edwards, Jennifer L.; Wiser, Ryan; Bolinger, Mark; Forsyth, Trudy

2004-01-01T23:59:59.000Z

123

Design Study and Cost Estimate for an Assurred Isolation Facility in Texas  

SciTech Connect

The optimized assured isolation facility (AIF) consists of waste shipping containers being placed inside steel-reinforced concrete overpacks, which are, in turn, placed in steel-reinforced concrete vaults without an earthen cover system. The concrete vaults are designed to remain in service for hundreds of years, with the aid of ongoing active maintenance. This will be required since the facility will remain under license as long as waste is present in the facility. The estimated present value of life-cycle costs total about $318 million. Of this amount, over 30 percent is attributable to the need to accumulate the financial assurance fund which allows future management options to be implemented. The charge for waste received at the AIF in order to recover all costs and ensure proper facility function following the waste acceptance period was calculated for each year of AIF operation, considering annual variations in the volume received and the costs that must be recovered. The present value of the AID unit charges range for $84 to $420 per cubic foot with a life-cycle average of about $177 per cubic foot. When making decisions on cost factors and comparing alternatives, the lifetime average of $177 per cubic foot is most meaningful.

Baird, R. D.; Rogers, B. C.; Chau, N.; Kerr, Thomas A

1999-08-01T23:59:59.000Z

124

Information erasure without an energy cost  

E-Print Network (OSTI)

Landauer argued that the process of erasing the information stored in a memory device incurs an energy cost in the form of a minimum amount of mechanical work. We find, however, that this energy cost can be reduced to zero by paying a cost in angular momentum or any other conserved quantity. Erasing the memory of Maxwell's demon in this way implies that work can be extracted from a single thermal reservoir at a cost of angular momentum and an increase in total entropy. The implications of this for the second law of thermodynamics are assessed.

Joan A. Vaccaro; Stephen M. Barnett

2010-04-29T23:59:59.000Z

125

Table 5B. Commercial Average Monthly Bill by Census Division ...  

U.S. Energy Information Administration (EIA)

Home > Electricity > Electric Sales, Revenue, and Price > Commercial Average Monthly Bill by Census Division, and State: Table 5B. Commercial Average Monthly Bill by ...

126

On the String Averaging Method for Sparse Common Fixed Points ...  

E-Print Network (OSTI)

Jul 10, 2008 ... gate a string-averaging algorithmic scheme that favorably handles the ... are special cases of the string-averaging and of the BIP algorithmic ...

127

Table 5A. Residential Average Monthly Bill by Census Division ...  

U.S. Energy Information Administration (EIA)

Table 5A. Residential Average Monthly Bill by Census Division, and State, 2009: Census Division State Number of Consumers Average Monthly Consumption ...

128

Average summer gasoline prices expected to be slightly lower ...  

U.S. Energy Information Administration (EIA)

The retail price for regular gasoline is expected to average $3.63 per gallon during this summer driving season, slightly below average prices over ...

129

Table 5B. Commercial average monthly bill by census division...  

U.S. Energy Information Administration (EIA) Indexed Site

" Census Division " " State ","Number of Consumers "," Average Monthly Consumption (kWh)","Price (Cents per Kilowatthour)","Average Monthly Bill (Dollar and cents)" "New...

130

Foodborne Illness Cost Calculator | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Foodborne Illness Cost Calculator Foodborne Illness Cost Calculator Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Foodborne Illness Cost Calculator Dataset Summary Description The calculator provides information on the assumptions behind foodborne illness cost estimates and gives you a chance to make your own assumptions and calculate your own cost estimates. This interactive web-based tool allows users to estimate the cost of illness due to specific foodborne pathogens. The updated ERS cost estimate for Shiga-toxin producing E. coli O157 (STEC O157) was added to the Calculator in spring, 2008. Calculator users can now review and change the assumptions behind the ERS cost estimates for either STEC O157 or Salmonella. The assumptions that can be modified include the annual number of cases, the distribution of cases by severity, the use or costs of medical care, the amount or value of time lost from work, the costs of premature death, and the disutility costs for nonfatal cases. Users can also update the cost estimate for inflation for any year from 1997 to 2007.

131

Unit costs of waste management operations  

SciTech Connect

This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

1994-04-01T23:59:59.000Z

132

Texas Gulf Coast Refinery District API Gravity (Weighted Average ...  

U.S. Energy Information Administration (EIA)

Texas Gulf Coast Refinery District API Gravity (Weighted Average) of Crude Oil Input to Refineries (Degree)

133

Impacts of time-of-day on average electricity prices and utility load factors  

SciTech Connect

A degree of rationalism is brought to the rate debate between marginalist time of day advocates and embedded cost traditionalists by an empirical analysis. Studies show that neither side can claim victory. The results show that blanket statements cannot be made concerning the impacts of TOD in demand and load factor, and that rates reduce only slightly. This paper summarizes the impacts of marginal cost TOD rates on peak demand, generation, load factor, and the average price of electricity. The methodology includes calculation of marginal cost, prediction of effect of TOD on load shapes by means of a Load Curve Forecasting model, and a production costing model. A matrix shows that impacts of TOD rates on individual utilities will depend on the specific utility customer mix, load shape, and generation mix.

Chamberlin, J.H.; Dickson, C.T.; Spann, R.M.

1982-06-01T23:59:59.000Z

134

A. Appendix: Cost Estimate for the Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Appendix: Cost Estimate for the Facility Appendix: Cost Estimate for the Facility Determining the cost of a facility as complex as the neutrino source presented here is a very difficult task within the short time period of six months. Three factors contribute to the uncertainty significantly: 1. The number of subsystems in the facility, which are described throughout the report, is comparatively large. All of the subsystems contribute a considerable amount of complexity and cost that have to be addressed by specific expertise in order to find a technical solution and a reasonable cost estimate. The variety of technologies is large and many of them have to be pushed to the edge or beyond and therefore has to be addressed with an appropriate R&D program. Cost savings from mass production will not be

135

Solar: monthly and annual average direct normal (DNI) GIS data at 40km  

Open Energy Info (EERE)

49031 49031 Varnish cache server Solar: monthly and annual average direct normal (DNI) GIS data at 40km resolution for China from NREL Dataset Summary Description (Abstract): Monthly Average Solar Resource for 2-axis tracking concentrating collectors for China. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to a concentrating collector, such as a dish collector, which tracks the sun continuously. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and sky) falling on a horizontal surface. Existing ground measurement stations are used to validate the data where possible. The modeled values are accurate to approximately 10% of a true measured value within the grid cell due to the uncertainties associated with meteorological input to

136

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

2018 Levelized Costs AEO 2013 1 2018 Levelized Costs AEO 2013 1 January 2013 Levelized Cost of New Generation Resources in the Annual Energy Outlook 2013 This paper presents average levelized costs for generating technologies that are brought on line in 2018 1 as represented in the National Energy Modeling System (NEMS) for the Annual Energy Outlook 2013 (AEO2013) Early Release Reference case. 2 Both national values and the minimum and maximum values across the 22 U.S. regions of the NEMS electricity market module are presented. Levelized cost is often cited as a convenient summary measure of the overall competiveness of different generating technologies. It represents the per-kilowatthour cost (in real dollars) of building and operating a generating plant over an assumed financial life and duty cycle. Key

137

Liquefaction and Pipeline Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

factors add 20 percent to liquefaction plant total installed cost 6 Distribution Pipeline Costs Collected historical Oil & Gas Journal data, and surveyed for current urban and...

138

Highly Insulating Windows - Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost Cost The following is an estimate of the cost effective incremental cost of highly-insulating windows (U-factor=0.20 Btu/hr-ft2-F) compared to regular ENERGY STAR windows (U-factor 0.35 Btu/hr-ft2-F). Energy savings from lower U-factors were simulated with RESFEN over an assumed useful window life of 25 years. To determine the maximum incremental cost at which highly-insulating windows would still be cost-effective, we used a formula used by many utility companies to calculate the cost of saved energy from energy efficiency programs, based on the programs' cost and savings. We turned this formula around so that the cost of saved energy equals the present energy prices in the studied locations, whereas the program cost (the incremental cost of the windows) is the dependent variable. By entering 5%

139

Vehicle Technologies Office: Fact #328: July 12, 2004 Expected Average  

NLE Websites -- All DOE Office Websites (Extended Search)

8: July 12, 2004 8: July 12, 2004 Expected Average Annual Miles to someone by E-mail Share Vehicle Technologies Office: Fact #328: July 12, 2004 Expected Average Annual Miles on Facebook Tweet about Vehicle Technologies Office: Fact #328: July 12, 2004 Expected Average Annual Miles on Twitter Bookmark Vehicle Technologies Office: Fact #328: July 12, 2004 Expected Average Annual Miles on Google Bookmark Vehicle Technologies Office: Fact #328: July 12, 2004 Expected Average Annual Miles on Delicious Rank Vehicle Technologies Office: Fact #328: July 12, 2004 Expected Average Annual Miles on Digg Find More places to share Vehicle Technologies Office: Fact #328: July 12, 2004 Expected Average Annual Miles on AddThis.com... Fact #328: July 12, 2004 Expected Average Annual Miles Twenty-five percent of the respondents to a nationwide survey said that

140

Vehicle Technologies Office: Fact #536: September 15, 2008 Average...  

NLE Websites -- All DOE Office Websites (Extended Search)

6: September 15, 2008 Average Used Car Prices Up and Used Light Truck Prices Down to someone by E-mail Share Vehicle Technologies Office: Fact 536: September 15, 2008 Average Used...

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Vehicle Technologies Office: Fact #517: May 5, 2008 State Average...  

NLE Websites -- All DOE Office Websites (Extended Search)

7: May 5, 2008 State Average Gasoline Prices, April 18, 2008 to someone by E-mail Share Vehicle Technologies Office: Fact 517: May 5, 2008 State Average Gasoline Prices, April 18,...

142

Vehicle Technologies Office: Fact #87: May 4, 1999 Average Annual...  

NLE Websites -- All DOE Office Websites (Extended Search)

7: May 4, 1999 Average Annual Miles per Vehicle by Vehicle Type and Age to someone by E-mail Share Vehicle Technologies Office: Fact 87: May 4, 1999 Average Annual Miles per...

143

Probabilistic Quantitative Precipitation Forecasting Using Bayesian Model Averaging  

Science Conference Proceedings (OSTI)

Bayesian model averaging (BMA) is a statistical way of postprocessing forecast ensembles to create predictive probability density functions (PDFs) for weather quantities. It represents the predictive PDF as a weighted average of PDFs centered on ...

J. Mc Lean Sloughter; Adrian E. Raftery; Tilmann Gneiting; Chris Fraley

2007-09-01T23:59:59.000Z

144

Vehicle Technologies Office: Fact #744: September 10, 2012 Average...  

NLE Websites -- All DOE Office Websites (Extended Search)

4: September 10, 2012 Average New Light Vehicle Price Grows Faster than Average Used Light Vehicle Price to someone by E-mail Share Vehicle Technologies Office: Fact 744:...

145

Improving Wind Profiler–Measured Winds Using Coplanar Spectral Averaging  

Science Conference Proceedings (OSTI)

A method is presented that increases the detectability of weak clear-air signals by averaging Doppler spectra from coplanar wind profiler beams. The method, called coplanar spectral averaging (CSA), is applied to both simulated wind profiler ...

Robert Schafer; Susan K. Avery; Kenneth S. Gage; Paul E. Johnston; D. A. Carter

2004-11-01T23:59:59.000Z

146

On Lateral Dispersion Coefficients as Functions of Averaging Time  

Science Conference Proceedings (OSTI)

Plume dispersion coefficients are discussed in terms of single-particle and relative diffusion, and are investigated as functions of averaging time. To demonstrate the effects of averaging time on the relative importance of various dispersion ...

C. M. Sheih

1980-05-01T23:59:59.000Z

147

Vorticity Dynamics and Zonally Averaged Ocean Circulation Models  

Science Conference Proceedings (OSTI)

Diagnostic equations relating the zonally averaged overturning circulation to north–south density variations are derived and used to determine a new closure scheme for use in zonally averaged ocean models. The presentation clarifies the dynamical ...

Daniel G. Wright; Cornelis B. Vreugdenhil; Tertia M. C. Hughes

1995-09-01T23:59:59.000Z

148

A Framework and Review of Customer Outage Costs: Integration and Analysis of  

E-Print Network (OSTI)

by Region, Season, Day of Week, and Year 36 Table 5-2. Average Outage Costs by Duration 36 Table 5, if a calculation of the average outage cost for a given year is calculated it would be heavily influenced and Day of Week and Year of Study This problem surfaces for many of the calculations of outage costs

149

Solar: monthly and annual average global horizontal (GHI) GIS data at 40km  

Open Energy Info (EERE)

Mexico, Central America, and the Caribbean Islands from NREL Mexico, Central America, and the Caribbean Islands from NREL Dataset Summary Description (Abstract): Monthly Average Solar Resource for horizontal flat-plate collectors, for Mexico, Central America, and the Caribbean Islands. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to a flat plate collector, such as a photovoltaic panel, oriented horizontally. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and sky) falling on a horizontal surface. Existing ground measurement stations are used to validate the data where possible. The modeled values are accurate to approximately 10% of a true measured value within the grid cell due to the uncertainties associated with meteorological input to the model. The local cloud cover can vary significantly even within a single grid cell as a result of terrain effects and other microclimate

150

Solar: annual average global horizontal (GHI) GIS data at 10km resolution  

Open Energy Info (EERE)

global horizontal (GHI) GIS data at 10km resolution global horizontal (GHI) GIS data at 10km resolution for Cuba from SUNY Dataset Summary Description (Abstract): Monthly Average Solar Resource for horizontal flat-plate solar collectors for Cuba (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to a horizontal flat-plate solar collector, such as a Photovoltaic (PV) solar panel. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 10 km by 10 km in size. The solar resource value is represented as kilowatt-hours per square meter per day for each month. The data were developed from the State University of New York's (SUNY) GOES satellite solar model. This model uses information on hourly satellite observed visible irradiance, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total of the normal or beam insolation falling on a tracking concentrator pointed

151

Solar: monthly and annual average global horizontal (GHI) GIS data at 40km  

Open Energy Info (EERE)

Ethiopia from NREL Ethiopia from NREL Dataset Summary Description (Abstract): Monthly average solar resource for horizontal flat-plate collectors for Ethiopia. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to a flat plate collector, such as a photovoltaic panel, oriented horizontally. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and sky) falling on a horizontal surface. Existing ground measurement stations are used to validate the data where possible. The modeled values are accurate to approximately 10% of a true measured value within the grid cell due to the uncertainties associated with meteorological input to the

152

Solar: monthly and annual average global horizontal (GHI) GIS data at 40km  

Open Energy Info (EERE)

China from NREL China from NREL Dataset Summary Description (Abstract): Monthly average solar resource for horizontal flat-plate collectors for China. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to a flat plate collector, such as a photovoltaic panel, oriented horizontally. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and sky) falling on a horizontal surface. Existing ground measurement stations are used to validate the data where possible. The modeled values are accurate to approximately 10% of a true measured value within the grid cell due to the uncertainties associated with meteorological input to the model. The local cloud cover can vary significantly even within a single grid cell as a result of terrain effects and other microclimate influences. Furthermore, the uncertainty of the modeled estimates increase with distance from reliable measurement sources and with the complexity of the terrain.

153

Solar: monthly and annual average latitude tilt GIS data at 40km resolution  

Open Energy Info (EERE)

China from NREL China from NREL Dataset Summary Description (Abstract): Monthly Average Solar Resource for flat-plate collectors tilted at latitude for China. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to a flat plate collector, such as a photovoltaic panel, oriented due south at an angle from horizontal equal to the latitude of the collector location. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and sky) falling on a horizontal surface. Existing ground measurement stations

154

Transparent Cost Database | Transparent Cost Database  

Open Energy Info (EERE)

Hide data for this chart (-)Show data for this chart (+) Loading data... Transparent Cost Database Generation Showing: Historical Projections Year Published: Release mouse to...

155

Table 5C. Industrial Average Monthly Bill by Census Division ...  

U.S. Energy Information Administration (EIA)

Home > Electricity > Electric Sales, Revenue, and Price > Industrial Average Monthly Bill by Census Division, and State: Table 5C. Industrial ...

156

Maryland Average Price of Natural Gas Delivered to Residential and ...  

U.S. Energy Information Administration (EIA)

Average Price of Natural Gas Delivered to Residential and Commercial Consumers by Local Distribution and Marketers in Selected States

157

Optimization Online - "Block-Iterative and String-Averaging ...  

E-Print Network (OSTI)

Jul 19, 2009 ... Optimization Online. "Block-Iterative and String-Averaging Projection Algorithms in Proton Computed Tomography Image Reconstruction".

158

Table 4. Average retail price for bundled and unbundled consumers ...  

U.S. Energy Information Administration (EIA)

Table 4. Average retail price for bundled and unbundled consumers by sector, Census Division, and State 2011

159

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

160

Pollution prevention cost savings potential  

SciTech Connect

The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

Celeste, J.

1994-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Early Station Costs Questionnaire  

NLE Websites -- All DOE Office Websites (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

162

Low Cost, Durable Seal  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost, Durable Seal Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability Transportation: 5,000 hr Stationary: 40,000 hr Durability Improve mechanical and chemical stability to achieve 40,000 hr of useful operating life. Low Cost Low Cost A material cost equivalent to or less than the cost of silicones in common use. 3 LOW COST, DURABLE SEAL

163

Consumer Winter Heating Oil Costs  

Gasoline and Diesel Fuel Update (EIA)

6 6 Notes: The outlook for heating oil costs this winter, due to high crude oil costs and tight heating oil supplies, breaks down to an expected increase in heating expenditures for a typical oil-heated household of more than $200 this winter, the result of an 18% increase in the average price and an 11% increase in consumption. The consumption increase is due to the colder than normal temperatures experienced so far this winter and our expectations of normal winter weather for the rest of this heating season. Last winter, Northeast heating oil (and diesel fuel) markets experienced an extremely sharp spike in prices when a severe weather situation developed in late January. It is virtually impossible to gauge the probability of a similar (or worse) price shock recurring this winter,

164

OOTW COST TOOLS  

Science Conference Proceedings (OSTI)

This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

HARTLEY, D.S.III; PACKARD, S.L.

1998-09-01T23:59:59.000Z

165

U.S. average gasoline and diesel fuel prices expected to be slightly lower in 2013 than in 2012  

U.S. Energy Information Administration (EIA) Indexed Site

average gasoline and diesel fuel prices expected to be average gasoline and diesel fuel prices expected to be slightly lower in 2013 than in 2012 Despite the recent run-up in gasoline prices, the U.S. Energy Information Administration expects falling crude oil prices will lead to a small decline in average motor fuel costs this year compared with last year. The price for regular gasoline is expected to average $3.55 a gallon in 2013 and $3.39 next year, according to EIA's new Short-Term Energy Outlook. That's down from $3.63 a gallon in 2012. For the short-term, however, pump prices are expected to peak at $3.73 per gallon in May because of higher seasonal fuel demand and refiners switching their production to make cleaner burning gasoline for the summer. Diesel fuel will continue to cost more than gasoline because of strong global demand for diesel.

166

A simplified and scalable should-cost tool in the oilfield services industry  

E-Print Network (OSTI)

Third party spend accounts for a significant amount of a business' costs. When procuring unique, highly-engineered components, this cost is often negotiated with suppliers during the procurement process. Due to the limited ...

Mealer, Clayton M

2013-01-01T23:59:59.000Z

167

Minimum cost model energy code envelope requirements  

SciTech Connect

This paper describes the analysis underlying development of the U.S. Department of Energy`s proposed revisions of the Council of American Building Officials (CABO) 1993 Model Energy Code (MEC) building thermal envelope requirements for single-family and low-rise multifamily residences. This analysis resulted in revised MEC envelope conservation levels based on an objective methodology that determined the minimum-cost combination of energy efficiency measures (EEMs) for residences in different locations around the United States. The proposed MEC revision resulted from a cost-benefit analysis from the consumer`s perspective. In this analysis, the costs of the EEMs were balanced against the benefit of energy savings. Detailed construction, financial, economic, and fuel cost data were compiled, described in a technical support document, and incorporated in the analysis. A cost minimization analysis was used to compare the present value of the total long-nm costs for several alternative EEMs and to select the EEMs that achieved the lowest cost for each location studied. This cost minimization was performed for 881 cities in the United States, and the results were put into the format used by the MEC. This paper describes the methodology for determining minimum-cost energy efficiency measures for ceilings, walls, windows, and floors and presents the results in the form of proposed revisions to the MEC. The proposed MEC revisions would, on average, increase the stringency of the MEC by about 10%.

Connor, C.C.; Lucas, R.G.; Turchen, S.J.

1994-08-01T23:59:59.000Z

168

Technical Basis for Averaging C-14 Filters, Interim Report: Carbon-14 Source Term Analysis for Encapsulated Filter Waste Forms  

Science Conference Proceedings (OSTI)

The number of power plants implementing submicron-size cartridge filters has increased with the incentive of radiation dose reduction. However, utilities are experiencing difficulty disposing of these filters due to significant increases in (14)C concentrations. This study provides an important technical basis for concentration averaging of encapsulated filters with the grouting of filter waste. The concentration averaging with grouting will save costs in disposal of Greater than Class C filters and will...

2000-11-07T23:59:59.000Z

169

Operations Cost Allocation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

170

Minimum Cost Arborescences ?  

E-Print Network (OSTI)

In this paper, we analyze the cost allocation problem when a group of agents or nodes have to be connected to a source, and where the cost matrix describing the cost of connecting each pair of agents is not necessarily symmetric, thus extending the well-studied problem of minimum cost spanning tree games, where the costs are assumed to be symmetric. The focus is on rules which satisfy axioms representing incentive and fairness properties. We show that while some results are similar, there are also significant differences between the frameworks corresponding to symmetric and asymmetric cost matrices.

Bhaskar Dutta; Debasis Mishra; We Thank Daniel Granot; Anirban Kar; Herve Moulin For Comments

2011-01-01T23:59:59.000Z

171

Nuclear fuel cycle costs  

Science Conference Proceedings (OSTI)

The costs for the back-end of the nuclear fuel cycle, which were developed as part of the Nonproliferation Alternative Systems Assessment Program (NASAP), are presented. Total fuel cycle costs are given for the pressurized water reactor once-through and fuel recycle systems, and for the liquid-metal fast breeder reactor system. These calculations show that fuel cycle costs are a small part of the total power costs. For breeder reactors, fuel cycle costs are about half that of the present once-through system. The total power cost of the breeder reactor system is greater than that of light-water reactor at today's prices for uranium and enrichment.

Burch, W.D.; Haire, M.J.; Rainey, R.H.

1982-02-01T23:59:59.000Z

172

OPTIMIZING TRANSMISSION SERVICE COST OF KHUZESTAN REGIONAL GRID BASED ON NSGA?II ALGORITHM  

Science Conference Proceedings (OSTI)

Any plan for modeling the components of transmission service costs should be able to consider congestion as well as loss cost. Assessing the real value of congestion and loss costs in each network has a substantial contribution to analyze the grid’s weaknesses in order to release capacity of power network. As much as the amount of congestion and loss costs in the transmission grid reduces the amount of power passing through transmission lines increases. Therefore

Alireza Tavakoli Shooshtari; Mahmood Joorabian; Armin Ebrahimi Milani; Arash Gholamzadeh

2011-01-01T23:59:59.000Z

173

Uncertainty Quantification and Calibration in Well Construction Cost Estimates  

E-Print Network (OSTI)

The feasibility and success of petroleum development projects depend to a large degree on well construction costs. Well construction cost estimates often contain high levels of uncertainty. In many cases, these costs have been estimated using deterministic methods that do not reliably account for uncertainty, leading to biased estimates. The primary objective of this work was to improve the reliability of deterministic well construction cost estimates by incorporating probabilistic methods into the estimation process. The method uses historical well cost estimates and actual well costs to develop probabilistic correction factors that can be applied to future well cost estimates. These factors can be applied to the entire well cost or to individual cost components. Application of the methodology to estimation of well construction costs for horizontal wells in a shale gas play resulted in well cost estimates that were well calibrated probabilistically. Overall, average estimated well cost using this methodology was significantly more accurate than average estimated well cost using deterministic methods. Systematic use of this methodology can provide for more accurate and efficient allocation of capital for drilling campaigns, which should have significant impacts on reservoir development and profitability.

Valdes Machado, Alejandro

2013-08-01T23:59:59.000Z

174

Special Feature: Reducing Energy Costs with Better Batteries  

NLE Websites -- All DOE Office Websites (Extended Search)

or less to consumers. Such a vehicle would reduce the United States' reliance on foreign oil and lower energy costs for the average American, so one of the Department of Energy's...

175

Vehicle Technologies Office: Fact #310: March 8, 2004 Average Material  

NLE Websites -- All DOE Office Websites (Extended Search)

0: March 8, 2004 0: March 8, 2004 Average Material Consumption for a Domestic Automobile to someone by E-mail Share Vehicle Technologies Office: Fact #310: March 8, 2004 Average Material Consumption for a Domestic Automobile on Facebook Tweet about Vehicle Technologies Office: Fact #310: March 8, 2004 Average Material Consumption for a Domestic Automobile on Twitter Bookmark Vehicle Technologies Office: Fact #310: March 8, 2004 Average Material Consumption for a Domestic Automobile on Google Bookmark Vehicle Technologies Office: Fact #310: March 8, 2004 Average Material Consumption for a Domestic Automobile on Delicious Rank Vehicle Technologies Office: Fact #310: March 8, 2004 Average Material Consumption for a Domestic Automobile on Digg Find More places to share Vehicle Technologies Office: Fact #310:

176

Average Interest Rate for Treasury Securities | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Average Interest Rate for Treasury Securities Average Interest Rate for Treasury Securities Consumer Data Apps Challenges Resources About Blogs Let's Talk Feedback Consumer You are here Data.gov » Communities » Consumer » Data Average Interest Rate for Treasury Securities Dataset Summary Description This dataset shows the average interest rates for U.S Treasury securities for the most recent month compared with the same month of the previous year. The data is broken down by the various marketable and non-marketable securities. The summary page for the data provides links for monthly reports from 2001 through the current year. Average Interest Rates are calculated on the total unmatured interest-bearing debt. The average interest rates for total marketable, total non-marketable and total interest-bearing debt do not include the U.S. Treasury Inflation-Protected Securities.

177

Orbit-averaged guiding-center Fokker-Planck operator  

Science Conference Proceedings (OSTI)

A general orbit-averaged guiding-center Fokker-Planck operator suitable for the numerical analysis of transport processes in axisymmetric magnetized plasmas is presented. The orbit-averaged guiding-center operator describes transport processes in a three-dimensional guiding-center invariant space: the orbit-averaged magnetic-flux invariant {psi}, the minimum-B pitch-angle coordinate {xi}{sub 0}, and the momentum magnitude p.

Brizard, A. J. [Department of Chemistry and Physics, Saint Michael's College, Colchester, Vermont 05439 (United States); Decker, J.; Peysson, Y.; Duthoit, F.-X. [CEA, IRFM, Saint-Paul-lez-Durance F-13108 (France)

2009-10-15T23:59:59.000Z

178

A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys  

Science Conference Proceedings (OSTI)

A clear understanding of the monetary value that customers place on reliability and the factors that give rise to higher and lower values is an essential tool in determining investment in the grid. The recent National Transmission Grid Study recognizes the need for this information as one of growing importance for both public and private decision makers. In response, the U.S. Department of Energy has undertaken this study, as a first step toward addressing the current absence of consistent data needed to support better estimates of the economic value of electricity reliability. Twenty-four studies, conducted by eight electric utilities between 1989 and 2002 representing residential and commercial/industrial (small, medium and large) customer groups, were chosen for analysis. The studies cover virtually all of the Southeast, most of the western United States, including California, rural Washington and Oregon, and the Midwest south and east of Chicago. All variables were standardized to a consistent metric and dollar amounts were adjusted to the 2002 CPI. The data were then incorporated into a meta-database in which each outage scenario (e.g., the lost of electric service for one hour on a weekday summer afternoon) is treated as an independent case or record both to permit comparisons between outage characteristics and to increase the statistical power of analysis results. Unadjusted average outage costs and Tobit models that estimate customer damage functions are presented. The customer damage functions express customer outage costs for a given outage scenario and customer class as a function of location, time of day, consumption, and business type. One can use the damage functions to calculate outage costs for specific customer types. For example, using the customer damage functions, the cost experienced by an ''average'' customer resulting from a 1 hour summer afternoon outage is estimated to be approximately $3 for a residential customer, $1,200 for small-medium commercial and industrial customer, and $82,000 for large commercial and industrial customer. Future work to improve the quality and coverage of information on the value of electricity reliability to customers is described.

Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

2003-11-01T23:59:59.000Z

179

The Time Cost of Tornado Warnings and the Savings with Storm-Based Warnings  

Science Conference Proceedings (OSTI)

The authors examine the cost of time spent under tornado warnings issued annually by the National Weather Service (NWS). County-based tornado warnings imposed substantial costs on the nation: an average of 234 million person-hours spent under ...

Daniel Sutter; Somer Erickson

2010-04-01T23:59:59.000Z

180

Hydrogen Threshold Cost Calculation  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Record (Offices of Fuel Cell Technologies) Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing vehicles [gasoline in hybrid-electric vehicles (HEVs)] in 2020. This record documents the methodology and assumptions used to calculate that threshold cost. Principles: The cost threshold analysis is a "top-down" analysis of the cost at which hydrogen would be

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Hydrogen Pathway Cost Distributions  

NLE Websites -- All DOE Office Websites (Extended Search)

Pathway Cost Distributions Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric hybrids are benchmarks * R&D guidance provided in two forms * Evolved gasoline ICE defines a threshold hydrogen cost used to screen or eliminate options which can't show ability to meet target * Gasoline-electric hybrid defines a lower hydrogen cost used to prioritize projects for resource allocation

182

Documents: Cost Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Search Documents: Search PDF Documents View a list of all documents Cost Analysis PDF Icon Summary of the Cost Analysis Report for the Long-term Management of Depleted UF6...

183

Reduce Oil Dependence Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Reduce Oil Dependence Costs U.S. Petroleum Use, 1970-2010 Nearly 40% of the oil we use is imported, costing us roughly 300 billion annually. Increased domestic oil production from...

184

Chemical Lifecycle Management Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Lifecycle Management Cost Presented by: J.M. Hieb, CH2M HILL Plateau Remediation Company CHPRC1204-04 Chemical Lifecycle Management Cost Everyone is trying to stretch a...

185

Average Depth of Crude Oil and Natural Gas Wells  

U.S. Energy Information Administration (EIA)

-No Data Reported; --= Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Notes: Average depth may ...

186

Table AP7. Average Expenditures for Home Appliances and Lighting ...  

U.S. Energy Information Administration (EIA)

A household is assigned to a climate zone according to the 30-year average annual degree-days for an appropriate nearby weather station.

187

Electric Sales, Revenue, and Average Price 2011 - Energy Information...  

U.S. Energy Information Administration (EIA) Indexed Site

All Electricity Reports Electric Sales, Revenue, and Average Price With Data for 2011 | Release Date: September 27, 2012 | Next Release Date: September, 2013 Previous editions...

188

Chapter 5. Retail Sales, Revenue, and Average Retail Price of ...  

U.S. Energy Information Administration (EIA)

106 U.S. Energy Information Administration/Electric Power Monthly June 2012 Chapter 5. Retail Sales, Revenue, and Average Retail Price of Electricity

189

Table 14a. Average Electricity Prices, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

a. Average Electricity Prices, Projected vs. Actual" "Projected Price in Constant Dollars" " (constant dollars, cents per kilowatt-hour in ""dollar year"" specific to each AEO)"...

190

Average wholesale electric power prices rose in 2010 - Today in ...  

U.S. Energy Information Administration (EIA)

Average wholesale electric power prices rose in 2010, due to higher national natural gas prices and increased demand for electricity, particularly in the Eastern ...

191

Electric Sales, Revenue, and Average Price 2011 - Energy ...  

U.S. Energy Information Administration (EIA)

Class of Ownership, Number of Consumers, Sales, Revenue, and Average Retail Price for Power Marketers and Energy Service Providers by State: T12:

192

Today in Energy - Average wholesale natural gas prices mostly ...  

U.S. Energy Information Administration (EIA)

Average spot natural gas prices, which reflect the wholesale price of natural gas at major trading points, generally declined in most U.S. regional markets about 7% ...

193

Ohio Average Price of Natural Gas Delivered to Residential and ...  

U.S. Energy Information Administration (EIA)

Average Price of Natural Gas Delivered to Residential and Commercial Consumers by Local Distribution and Marketers in Selected States (Dollars per Thousand Cubic Feet ...

194

Average prices for spot sulfur dioxide emissions allowances at ...  

U.S. Energy Information Administration (EIA)

The weighted average spot price for sulfur dioxide (SO 2) emissions allowances awarded to winning bidders at Environmental Protection Agency's (EPA) annual auction on ...

195

Climate: monthly and annual average relative humidity GIS data...  

Open Energy Info (EERE)

Climate: monthly and annual average relative humidity GIS data at one-degree resolution of the World from NASASSE

(Abstract):  
Relative Humidity at 10 m...

196

Pennsylvania Average Price of Natural Gas Delivered to Residential ...  

U.S. Energy Information Administration (EIA)

Average Price of Natural Gas Delivered to Residential and Commercial Consumers by Local Distribution and Marketers in Selected States (Dollars per Thousand Cubic Feet ...

197

District of Columbia Average Price of Natural Gas Delivered to ...  

U.S. Energy Information Administration (EIA)

Average Price of Natural Gas Delivered to Residential and Commercial Consumers by Local Distribution and Marketers in Selected States (Dollars per Thousand Cubic Feet ...

198

Michigan Average Price of Natural Gas Delivered to Residential and ...  

U.S. Energy Information Administration (EIA)

Average Price of Natural Gas Delivered to Residential and Commercial Consumers by Local Distribution and Marketers in Selected States (Dollars per Thousand Cubic Feet ...

199

,"U.S. Natural Gas Average Annual Consumption per Commercial...  

U.S. Energy Information Administration (EIA) Indexed Site

,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Natural Gas Average Annual Consumption per Commercial Consumer (Mcf)",1,"Annual",2011...

200

,"U.S. Natural Gas Average Annual Consumption per Industrial...  

U.S. Energy Information Administration (EIA) Indexed Site

,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Natural Gas Average Annual Consumption per Industrial Consumer (Mcf)",1,"Annual",2011...

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

2012 Brief: Average wholesale electricity prices down compared ...  

U.S. Energy Information Administration (EIA)

2012 Brief: Average wholesale electricity prices down compared to last year. ... wholesale electric power prices often trend together with natural gas prices.

202

Average wholesale spot natural gas prices rose across the country ...  

U.S. Energy Information Administration (EIA)

Wholesale spot natural gas prices rose across the country in 2010. Average spot natural gas prices at the Henry Hub—a key benchmark location for pricing throughout ...

203

EIA Renewable Energy- Average Energy Conversion Efficiency of ...  

U.S. Energy Information Administration (EIA)

Renewables and Alternate Fuels > Solar Photovoltaic Cell/Module Annual Report > Annual Shipments of Photovoltaic Cells and Modules by Source: Average Energy ...

204

,"Selected National Average Natural Gas Prices"  

U.S. Energy Information Administration (EIA) Indexed Site

Selected National Average Natural Gas Prices" Selected National Average Natural Gas Prices" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Average Natural Gas Prices",11,"Monthly","11/2013","1/15/1973" ,"Data 2","Annual Average Natural Gas Prices",11,"Annual",2012,"6/30/1922" ,"Release Date:","12/12/2013" ,"Next Release Date:","1/7/2014" ,"Excel File Name:","ngm03vmall.xls" ,"Available from Web Page:","http://www.eia.gov/oil_gas/natural_gas/data_publications/natural_gas_monthly/ngm.html"

205

New York Average Price of Natural Gas Delivered to Residential ...  

U.S. Energy Information Administration (EIA)

Average Price of Natural Gas Delivered to Residential and Commercial Consumers by Local Distribution and Marketers in Selected States (Dollars per ...

206

Cost Estimation Recommendations  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

207

U. S. Military Expenditures to Protect the Use of Persian Gulf Oil for Motor Vehicles: Report #15 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

the cost of crude oil and the cost of the products is notare related to the amount and cost of oil imported from theDivision, The External Costs of Oil Used in Transportation,

Delucchi, Mark; Murphy, James

2006-01-01T23:59:59.000Z

208

How much does it cost to generate electricity with different types ...  

U.S. Energy Information Administration (EIA)

How much does it cost to generate electricity with different types of power plants? EIA has historical data on the average annual operation, maintenance, ...

209

Cost of transporting coal to power plants rose almost 50% in ...  

U.S. Energy Information Administration (EIA)

The average cost of shipping coal by railroad to power plants increased almost 50% in the United States from 2001 to 2010.

210

Cost of transporting coal to power plants rose almost 50% in ...  

U.S. Energy Information Administration (EIA)

Nuclear & Uranium. Uranium fuel, ... The average cost of shipping coal by railroad to power plants increased almost 50% in the United ... National numbers can be ...

211

Power Plant Cycling Costs  

Science Conference Proceedings (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

212

Pros, cons of techniques used to calculate oil, gas finding costs  

SciTech Connect

A major problem facing the U.S. petroleum industry is the higher average finding costs that now exist within the U.S. compared with the average finding costs outside the U.S. It has been argued that federal lands and offshore areas need to be open for drilling in order to reduce average finding costs in the U.S. This article analyzes the strengths and weaknesses of conventional techniques for determining finding costs. Our goal is a finding costs measure that is a reliable indicator of future profitability.

Gaddis, D.; Brock, H.; Boynton, C. (Inst. of Petroleum Accounting, Denton, TX (US))

1992-06-01T23:59:59.000Z

213

Prime movers reduce energy costs  

SciTech Connect

Many industrial plants have found that reciprocating engines used to power generator sets and chiller systems are effective in reducing energy costs as part of a load management strategy, while meeting other plant energy needs. As the trend towards high electric utility costs continues, familiarity with basic analyses used to determine the economic viability of engine-driven systems is essential. A basic method to determine the economic viability of genset or chiller systems is to review the supplying utility`s rate structure, determine approximate costs to install and operate an engine-driven system, and calculate a simple equipment payback period. If the initial analysis shows that significant savings are possible and a quick payback is likely, a thorough analysis should be conducted to analyze a plant`s actual electric load profile. A load profile analysis takes into consideration average loads, peak loads, and peak duration. A detailed study should cover myriad considerations, including local air quality regulations and permitting, space availability, auxiliary system components, and financing options. A basic analysis takes relatively little time and can rule out the need for a detailed study.

Swanson, J.E. [Caterpillar, Inc., Mossville, IL (United States)

1996-01-01T23:59:59.000Z

214

Solar: monthly and annual average direct normal (DNI), global horizontal  

Open Energy Info (EERE)

East Asia from NREL East Asia from NREL Dataset Summary Description (Abstract): Monthly Average Solar Resource for horizontal and tilted flat-plates, and 2-axis tracking concentrating collectors. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to solar collectors. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water

215

Solar: monthly and annual average direct normal (DNI), global horizontal  

Open Energy Info (EERE)

Africa from NREL Africa from NREL Dataset Summary Description (Abstract): Monthly Average Solar Resource for horizontal and tilted flat-plates, and 2-axis tracking concentrating collectors. (Purpose): Provide information on the solar resource potential for the data domain. The insolation values represent the average solar energy available to solar collectors. (Supplemental Information): These data provide monthly average and annual average daily total solar resource averaged over surface cells of approximately 40 km by 40 km in size. The solar resource value is represented as watt-hours per square meter per day for each month. The data were developed from NREL's Climatological Solar Radiation (CSR) Model. This model uses information on cloud cover, atmospheric water

216

Cost-driven octree construction schemes: an experimental study  

Science Conference Proceedings (OSTI)

Many algorithmic problems are interesting to both theoreticians and practitioners, but in a different manner. While the theoreticians have traditionally focused on worst-case scenarios which is often not very useful in practice, the practitioners are ... Keywords: average performance, cost model, cost prediction, octree, ray shooting, space decomposition

Boris Aronov; Hervé Bronnimann; Allen Y. Chang; Yi-Jen Chiang

2003-06-01T23:59:59.000Z

217

Cost-driven octree construction schemes: an experimental study  

Science Conference Proceedings (OSTI)

Given a scene consisting of objects, ray shooting queries answer with the first object encountered by a given ray, and are used in ray tracing and radiosity for rendering photo-realistic images in graphics, radio propagation simulation, and many other ... Keywords: average performance, cost model, cost prediction, octree, ray shooting, space decomposition

Boris Aronov; Hervé Brönnimann; Allen Y. Chang; Yi-Jen Chiang

2005-05-01T23:59:59.000Z

218

Using Henry's Constant for Determining the Amount of Isoprene in the Liquid Phase The amount of isoprene in the gas phase (mols)1.  

E-Print Network (OSTI)

pressure 101,000 (Pa)2. Volume of the liquid phase3. Things you need to know Math Amount of isoprene in gas = ideal gas constant 8.314 J mol-1 K-1 T = temperature of liquid phase units °K (which is 273.1 + °C) CUsing Henry's Constant for Determining the Amount of Isoprene in the Liquid Phase The amount

Last, Robert L.

219

Impacts of Large Amounts of Wind Power on Design and Operation of Power Systems, Results of IEA Collaboration  

SciTech Connect

There are a multitude of studies completed and ongoing related to the cost of wind integration. However, the results are not easy to compare. An international forum for exchange of knowledge of power system impacts of wind power has been formed under the IEA Implementing Agreement on Wind Energy. IEA WIND R and D Task 25 on 'Design and Operation of Power Systems with Large Amounts of Wind Power' produced a state-of-the-art report in October 2007, where the most relevant wind-power grid integration studies were analyzed, especially regarding methodologies and input data. This paper summarizes the results from 18 case studies, with discussion on differences in methodology as well as issues that have been identified to impact the cost of wind integration.

Holttinen, H.; Meibom, P.; Orths, A.; O'Malley, M.; Ummels, B. C.; Tande, J. O.; Estanqueiro, A.; Gomez, E.; Smith, J. C.; Ela, E.

2008-01-01T23:59:59.000Z

220

Commercial equipment cost database  

SciTech Connect

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Include in Column B cost of all composition produced by plant. Include in Column C cost of all operations not involving printing (Col. A)  

E-Print Network (OSTI)

occupied (whether Government-owned or rented), utilities, etc. (14.5 cents per month per square foot. Amount spent for rental of equipment Total cost (Use col.A total from this line to compute cost per 1 units produced in plant this fiscal quarter Total units produced in plant this fiscal year Cost per 1

US Army Corps of Engineers

222

Methods | Transparent Cost Database  

Open Energy Info (EERE)

Methods Methods Disclaimer The data gathered here are for informational purposes only. Inclusion of a report in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a single discount rate in order to compare technology costs only. About the Cost Database For emerging energy technologies, a variety of cost and performance numbers are cited in presentations and reports for present-day characteristics and potential improvements. Amid a variety of sources and methods for these data, the Office of Energy Efficiency and Renewable Energy's technology development programs determine estimates for use in program planning. The Transparent Cost Database collects program cost and performance

223

Low cost MCFC anodes  

DOE Green Energy (OSTI)

This paper outlines a project, funded under a DOE SBIR grant, which tested a potentially lower cost method of manufacturing MCFC stack anodes and evaluated the feasibility of using the technology in the existing M-C Power Corp. manufacturing facility. The procedure involves adding activator salts to the anode tape casting slurry with the Ni and Cr or Al powders. Two different processes occur during heat treatment in a reducing environment: sintering of the base Ni structure, and alloying or cementation of the Cr or Al powders. To determine whether it was cost-effective to implement the cementation alloying manufacturing process, the M-C Power manufacturing cost model was used to determine the impact of different material costs and processing parameters on total anode cost. Cost analysis included equipment expenditures and facility modifications required by the cementation alloying process.

Erickson, D.S.

1996-12-31T23:59:59.000Z

224

Average monthly gasoline price to fall to $3.43 by September  

U.S. Energy Information Administration (EIA) Indexed Site

monthly gasoline price to fall to $3.43 by September monthly gasoline price to fall to $3.43 by September The U.S. average monthly retail price of gasoline is expected to decline by about 18 cents per gallon between May and September, according to the new forecast from the U.S. Energy Information Administration. The lower price reflects, in part, slightly lower crude oil prices that account for about two-thirds of the cost at the pump. The largest price drops are expected in the Midwest states as refineries serving that region, which had been down for planned and unplanned maintenance, return to operation. For the year as a whole, the annual average retail gasoline price is forecasted to decline from $3.63 a gallon last year to $3.49 a gallon this year...and then drop to $3.37 per gallon in 2014

225

What solar heating costs  

SciTech Connect

Few people know why solar energy systems cost what they do. Designers and installers know what whole packages cost, but rarely how much goes to piping, how much for labor and how much for the collectors. Yet one stands a better chance of controlling costs if one can compare where the money is going against where it should be going. A detailed Tennessee Valley Authority study of large solar projects shows how much each component contributes to the total bill.

Adams, J.A.

1985-05-01T23:59:59.000Z

226

Cost analysis guidelines  

Science Conference Proceedings (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

227

CAES Updated Cost Assessment  

Science Conference Proceedings (OSTI)

Compressed Air Energy Storage Systems (CAES) for bulk energy storage applications have been receiving renewed interest. Increased penetration of large quantities of intermittent wind generation are requiring utilities to re-examine the cost and value of CAES systems. New second generation CAES cycles have been identified which offer the potential for lower capital and operating costs. This project was undertaken to update and summarize the capital and operating costs and performance features of second ge...

2008-12-23T23:59:59.000Z

228

ARM - Evaluation Product - Average of Cloud Condensation Nuclei...  

NLE Websites -- All DOE Office Websites (Extended Search)

are averaged together. The %ss in the CCN data stream is calculated using a heat transfer and fluid dynamics model flow model (Lance et al., 2006). The model uses the...

229

Virginia Average Price of Natural Gas Delivered to Residential...  

U.S. Energy Information Administration (EIA) Indexed Site

10.34 9.79 11.62 14.97 NA 20.70 1989-2013 Commercial Average Price 8.35 8.21 9.11 9.52 9.96 10.36...

230

New York Average Price of Natural Gas Delivered to Residential...  

U.S. Energy Information Administration (EIA) Indexed Site

94 11.57 12.82 15.94 18.40 18.73 1989-2013 Commercial Average Price 8.38 8.32 8.27 8.38 7.91 6.66...

231

Maryland Average Price of Natural Gas Delivered to Residential...  

U.S. Energy Information Administration (EIA) Indexed Site

0.35 10.04 12.02 15.43 17.45 16.48 1989-2013 Commercial Average Price 9.03 9.30 10.67 11.84 12.79 NA...

232

annual average heating degree days | OpenEI  

Open Energy Info (EERE)

average heating degree days average heating degree days Dataset Summary Description (Abstract): Heating Degree Days below 18° C (degree days)The monthly accumulation of degrees when the daily mean temperature is below 18° C.NASA Surface meteorology and Solar Energy (SSE) Release 6.0 Data Set (Nov 2007)22-year Monthly Average & Annual Sum (July 1983 - June 2005)Parameter: Heating Degree Days Below 18 degrees C (degree days)Internet: http://eosweb.larc.nasa.gov/sse/ Source U.S. National Aeronautics and Space Administration (NASA), Surface meteorology and Solar Energy (SSE) Date Released March 31st, 2009 (5 years ago) Date Updated April 01st, 2009 (5 years ago) Keywords annual average heating degree days climate GIS NASA SWERA UNEP Data application/zip icon Download Shapefile (zip, 2.7 MiB)

233

Average Diurnal Variation of Summer Lightning over the Floirida Peninsula  

Science Conference Proceedings (OSTI)

Data derived from a large network of electric field mills have been used to determine the average diurnal variation of lightning in a Florida seacoast environment. These data were obtained at the NASA Kennedy Space Center (KSC) and the Cape ...

Launa M. Maier; E. Philip Krider; Michael W. Maier

1984-06-01T23:59:59.000Z

234

Table 14b. Average Electricity Prices, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

b. Average Electricity Prices, Projected vs. Actual Projected Price in Nominal Dollars (nominal dollars, cents per kilowatt-hour) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002...

235

2012 Brief: Average wholesale electricity prices down compared to ...  

U.S. Energy Information Administration (EIA)

Average, on-peak (weekdays from 7:00 a.m. to 11:00 p.m.) day-ahead electricity prices were lower across the entire United States in 2012 compared to 2011.

236

Table 14b. Average Electricity Prices, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

b. Average Electricity Prices, Projected vs. Actual" "Projected Price in Nominal Dollars" " (nominal dollars, cents per kilowatt-hour)" ,1993,1994,1995,1996,1997,1998,1999,2000,200...

237

Does anyone have access to 2012 average residential rates by...  

Open Energy Info (EERE)

Does anyone have access to 2012 average residential rates by utility company? I'm seeing an inconsistency between the OpenEI website and EIA 861 data set. Home > Groups > Utility...

238

Exact Averaging of Atmospheric State and Flow Variables  

Science Conference Proceedings (OSTI)

A new set of averaging rules is put forward that exactly determines the means of air temperature, mixing ratio, and velocity by incorporating weighting factors in accordance with physical conservation laws. For the temperature and velocity, ...

Andrew S. Kowalski

2012-05-01T23:59:59.000Z

239

Figure 88. Annual average Henry Hub spot prices for natural ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 88. Annual average Henry Hub spot prices for natural gas in five cases, 1990-2040 (2011 dollars per million Btu) Reference

240

Figure 86. Annual average Henry Hub spot natural gas prices ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 86. Annual average Henry Hub spot natural gas prices, 1990-2040 (2011 dollars per million Btu) Henry Hub Spot Price 1990.00

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Using Bayesian Model Averaging to Calibrate Forecast Ensembles  

Science Conference Proceedings (OSTI)

Ensembles used for probabilistic weather forecasting often exhibit a spread-error correlation, but they tend to be underdispersive. This paper proposes a statistical method for postprocessing ensembles based on Bayesian model averaging (BMA), ...

Adrian E. Raftery; Tilmann Gneiting; Fadoua Balabdaoui; Michael Polakowski

2005-05-01T23:59:59.000Z

242

Pennsylvania Average Price of Natural Gas Delivered to Residential...  

Gasoline and Diesel Fuel Update (EIA)

7 10.55 11.24 13.80 16.87 19.85 1989-2013 Commercial Average Price 9.51 9.87 10.27 11.46 12.38 12.89...

243

Semi-supervised training for the averaged perceptron POS tagger  

Science Conference Proceedings (OSTI)

This paper describes POS tagging experiments with semi-supervised training as an extension to the (supervised) averaged perceptron algorithm, first introduced for this task by (Collins, 2002). Experiments with an iterative training on standard-sized ...

Drahomíra "johanka" Spoustová; Jan Haji?; Jan Raab; Miroslav Spousta

2009-03-01T23:59:59.000Z

244

A Statistical Averaging Method for Wind Profiler Doppler Spectra  

Science Conference Proceedings (OSTI)

A new method is presented for Doppler spectral averaging that more reliably identifies the profiler radar return from clear air in the presence of contamination—for example, from migrating bird echoes. These very sensitive radars profile the wind ...

David A. Merritt

1995-10-01T23:59:59.000Z

245

The averaged control system of fast oscillating control systems  

E-Print Network (OSTI)

For control systems that either have an explicit periodic dependence on time or have periodic solutions and small controls, we define an average control system that takes into account all possible variations of the control, and prove that its solutions approximate all solutions of the oscillating systems as oscillations go faster. The dimension of its velocity set is characterised geomtrically. When it is maximum the average system defines a Finsler metric, unfortunately not twice differntiable in general. Under particular assumptions, valid for the control two body system, this Finsler metric generates a Hamiltonian flow on the cotangent bundle. For minimum time control, this average system proves that averaging the Hamiltonian given by the maximum principle is a valid approximation.

Bombrun, Alex

2011-01-01T23:59:59.000Z

246

Implication of Spatial Averaging in Complex-Terrain Wind Studies  

Science Conference Proceedings (OSTI)

Studies of wind over complex terrain have been conducted at three times and two locations in Northern California. Instrumentation included conventional cup-vane anemometers and optical anemometers with spatial averaging over path lengths of 0.6-1 ...

W. M. Porch

1982-09-01T23:59:59.000Z

247

Vehicle Technologies Office: Fact #638: August 30, 2010 Average...  

NLE Websites -- All DOE Office Websites (Extended Search)

8: August 30, 2010 Average Expenditure for a New Car Declines in Relation to Family Earnings to someone by E-mail Share Vehicle Technologies Office: Fact 638: August 30, 2010...

248

Electric Sales, Revenue, and Average Price 2011 - Energy ...  

U.S. Energy Information Administration (EIA)

2001-2010 are Excel zipped files & 1994-2000 are PDF files ... and Average Retail Price for Power Marketers and ... U.S. Department of Energy USA.gov FedStats.

249

U.S. Natural Gas Average Consumption per Commercial Consumer...  

U.S. Energy Information Administration (EIA) Indexed Site

Commercial Consumer (Thousand Cubic Feet) U.S. Natural Gas Average Consumption per Commercial Consumer (Thousand Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

250

Solar: monthly and annual average global horizontal irradiance...  

Open Energy Info (EERE)

b>  
Global Horizontal Irradiance
NASA Surface meteorology and Solar Energy (SSE) Release 6.0 Data Set (Jan 2008)
22-year Monthly & Annual Average...

251

Solar: monthly and annual average direct normal irradiance GIS...  

Open Energy Info (EERE)

>  
Direct Normal Irradiance (kWhm2day)
NASA Surface meteorology and Solar Energy (SSE) Release 6.0 Data Set (Jan 2008)
22-year Monthly & Annual Average...

252

Benthic Boundary-Layer Velocity Profiles: Dependence on Averaging Period  

Science Conference Proceedings (OSTI)

The relationship between benthic boundary-layer velocity profiles and current meter averaging time is investigated using detailed (0.61 Hz) current measurements recorded within 1 m of the bottom on the inner continental shelf. The percentage of ...

Barry M. Lesht

1980-06-01T23:59:59.000Z

253

Average utilization of the nation's natural gas combined-cycle ...  

U.S. Energy Information Administration (EIA)

... (purple line) and 2010 (red line) average capacity factors for natural gas plant operations between 10 p.m. and 6 a.m. rose from 26% to 32%.

254

STATE OF CALIFORNIA AREA WEIGHTED AVERAGE CALCULATION WORKSHEET: RESIDENTIAL  

E-Print Network (OSTI)

there is more than one level of floor, wall, or ceiling insulation in a building, or more than one type of a building feature, material, or construction assembly occur in a building, a weighted average

255

Solar: monthly and annual average latitude tilt irradiance GIS...  

Open Energy Info (EERE)

& Annual Average (July 1983 - June 2005)
Parameter: Latitude Tilt Radiation (kWhm2day)
Internet: http:eosweb.larc.nasa.govsse
Note 1:...

256

Some Considerations Relevant to Computing Average Hemispheric Temperature Anomalies  

Science Conference Proceedings (OSTI)

Three data bases of gridded surface temperature anomalies were used to assess the sensitivity of the average estimated Northern Hemisphere (NH) temperature anomaly to: 1) extreme gridpoint values and 2) zonal band contributions. Over the last 100 ...

S. L. Grotch

1987-07-01T23:59:59.000Z

257

New Mexico Natural Gas Average Consumption per Industrial Consumer...  

U.S. Energy Information Administration (EIA) Indexed Site

Industrial Consumer (Thousand Cubic Feet) New Mexico Natural Gas Average Consumption per Industrial Consumer (Thousand Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

258

New Mexico Natural Gas Average Consumption per Commercial Consumer...  

U.S. Energy Information Administration (EIA) Indexed Site

Commercial Consumer (Thousand Cubic Feet) New Mexico Natural Gas Average Consumption per Commercial Consumer (Thousand Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

259

Target Cost Management Strategy  

E-Print Network (OSTI)

Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

Okano, Hiroshi

1996-01-01T23:59:59.000Z

260

Cost Affordable Titanium IV  

Science Conference Proceedings (OSTI)

Jul 31, 2012 ... Enhancing the Cost Effectiveness of High Performance Titanium Alloy Component Production by Powder Metallurgy · Evolution of Texture in ...

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Cost Effective Single Crystals  

Science Conference Proceedings (OSTI)

three relevant technologies, namely casting, alloy development and orientation measurement, developed by Rolls-Royce to enable the cost effective production.

262

Sharing Supermodular Costs  

E-Print Network (OSTI)

the costs collectively incurred by a group of cooperating agents. ..... Mixed integer programming formulations for production planning and scheduling prob- lems.

263

Petroleum well costs.  

E-Print Network (OSTI)

??This is the first academic study of well costs and drilling times for Australia?s petroleum producing basins, both onshore and offshore. I analyse a substantial… (more)

Leamon, Gregory Robert

2006-01-01T23:59:59.000Z

264

COST REVIEW and ESTIMATING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Programming Guide. OMB Circular A-94, Guidelines and Discount Rates for Benefit-Cost Analysis of Federal Programs, dated October 29, 1992 Page | 41 APPENDIX A ICRICE...

265

The Cost of Debt ?  

E-Print Network (OSTI)

We estimate firm-specific marginal cost of debt functions for a large panel of companies between 1980 and 2007. The marginal cost curves are identified by exogenous variation in the marginal tax benefits of debt. The location of a given company’s cost of debt function varies with characteristics such as asset collateral, size, book-to-market, asset tangibility, cash flows, and whether the firm pays dividends. By integrating the area between benefit and cost functions we estimate that the equilibrium net benefit of debt is 3.5 % of asset value, resulting from an estimated gross benefit of debt of 10.4 % of asset value and an estimated cost of debt of 6.9%. We find that the cost of being overlevered is asymmetrically higher than the cost of being underlevered and that expected default costs constitute approximately half of the total ex ante cost of debt. We thank Rick Green (the Acting Editor), and an anonymous referee, Heitor Almeida, Ravi Bansal,

Jules H. Van Binsbergen; John R. Graham; Jie Yang

2010-01-01T23:59:59.000Z

266

Hydrogen and Infrastructure Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of...

267

Reducing Energy Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy expense is becoming increasingly dominant in the operating costs of high-performance computing (HPC) systems. At the same time, electricity prices vary significantly at...

268

Table A44. Average Prices of Purchased Electricity and Steam  

U.S. Energy Information Administration (EIA) Indexed Site

4. Average Prices of Purchased Electricity and Steam" 4. Average Prices of Purchased Electricity and Steam" " by Type of Supplier, Census Region, Census Division, and" " Economic Characteristics of the Establishment, 1994" " (Estimates in Dollars per Physical Units)" ," Electricity",," Steam" ," (kWh)",," (million Btu)" ,,,,,"RSE" ,"Utility","Nonutility","Utility","Nonutility","Row" "Economic Characteristics(a)","Supplier(b)","Supplier(c)","Supplier(b)","Supplier(c)","Factors"

269

Specification of optical components for a high average-power laser environment  

Science Conference Proceedings (OSTI)

Optical component specifications for the high-average-power lasers and transport system used in the Atomic Vapor Laser Isotope Separation (AVLIS) plant must address demanding system performance requirements. The need for high performance optics has to be balanced against the practical desire to reduce the supply risks of cost and schedule. This is addressed in optical system design, careful planning with the optical industry, demonstration of plant quality parts, qualification of optical suppliers and processes, comprehensive procedures for evaluation and test, and a plan for corrective action.

Taylor, J.R.; Chow, R.; Rinmdahl, K.A.; Willis, J.B.; Wong, J.N.

1997-06-25T23:59:59.000Z

270

U.S. Refiner Sales to End Users (Average) Prices  

U.S. Energy Information Administration (EIA) Indexed Site

Sales Type: Sales to End Users, Average Through Retail Outlets Sales for Resale, Average DTW Rack Bulk Sales Type: Sales to End Users, Average Through Retail Outlets Sales for Resale, Average DTW Rack Bulk Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Formulation/ Grade Sales Type Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History Conventional, Average 3.030 3.137 3.122 3.063 3.042 2.972 1994-2013 Conventional Regular 3.005 3.116 3.102 3.040 3.017 2.948 1994-2013 Conventional Midgrade 3.167 3.256 3.239 3.200 3.193 3.121 1994-2013 Conventional Premium 3.269 3.354 3.327 3.291 3.274 3.203 1994-2013 Oxygenated, Average - - - - - - 1994-2013 Oxygenated Regular - - - - - - 1994-2013 Oxygenated Midgrade - - - - - - 1994-2013

271

Bayesian Model Averaging’s Problematic Treatment of Extreme Weather and a Paradigm Shift That Fixes It  

Science Conference Proceedings (OSTI)

Methods of ensemble postprocessing in which continuous probability density functions are constructed from ensemble forecasts by centering functions around each of the ensemble members have come to be called Bayesian model averaging (BMA) or “...

Craig H. Bishop; Kevin T. Shanley

2008-12-01T23:59:59.000Z

272

Average Soil Water Retention Curves Measured by Neutron Radiography  

SciTech Connect

Water retention curves are essential for understanding the hydrologic behavior of partially-saturated porous media and modeling flow transport processes within the vadose zone. In this paper we report direct measurements of the main drying and wetting branches of the average water retention function obtained using 2-dimensional neutron radiography. Flint sand columns were saturated with water and then drained under quasi-equilibrium conditions using a hanging water column setup. Digital images (2048 x 2048 pixels) of the transmitted flux of neutrons were acquired at each imposed matric potential (~10-15 matric potential values per experiment) at the NCNR BT-2 neutron imaging beam line. Volumetric water contents were calculated on a pixel by pixel basis using Beer-Lambert s law after taking into account beam hardening and geometric corrections. To remove scattering effects at high water contents the volumetric water contents were normalized (to give relative saturations) by dividing the drying and wetting sequences of images by the images obtained at saturation and satiation, respectively. The resulting pixel values were then averaged and combined with information on the imposed basal matric potentials to give average water retention curves. The average relative saturations obtained by neutron radiography showed an approximate one-to-one relationship with the average values measured volumetrically using the hanging water column setup. There were no significant differences (at p < 0.05) between the parameters of the van Genuchten equation fitted to the average neutron radiography data and those estimated from replicated hanging water column data. Our results indicate that neutron imaging is a very effective tool for quantifying the average water retention curve.

Cheng, Chu-Lin [ORNL; Perfect, Edmund [University of Tennessee, Knoxville (UTK); Kang, Misun [ORNL; Voisin, Sophie [ORNL; Bilheux, Hassina Z [ORNL; Horita, Juske [Texas Tech University (TTU); Hussey, Dan [NIST Center for Neutron Research (NCRN), Gaithersburg, MD

2011-01-01T23:59:59.000Z

273

Breakeven costs of storage in optimized solar energy systems  

DOE Green Energy (OSTI)

The results are described of an analysis of the breakeven cost, or value, of energy storage to solar energy systems. It is shown that the value of storage depends strongly both on solar fraction of the solar energy system in which the storage is employed, and on the cost of the collectors used in the system. Various strategies for dealing with this ambiguity are presented, and it is shown that for a broad class of technically and economically practical solar energy systems, storage costs need only be low enough to make a system employing very small amounts of storage practical. Reductions in cost of collectors will thereafter produce greater reductions in the total system costs or provide greater fuel displacement at constant total system cost than will reductions in the cost of storage, within limits discussed. The analysis makes use of a simple, accurate representation of solar energy system performance which may prove useful in other contexts.

Leigh, R. W.

1981-09-01T23:59:59.000Z

274

Cost-Affordable Titanium III  

Science Conference Proceedings (OSTI)

Cost-Effective Production and Thermomechanical Consolidation of Titanium Alloy Powders · Cost Affordable Developments in Titanium Technology and ...

275

What types and amounts of energy are produced in each state? - FAQ ...  

U.S. Energy Information Administration (EIA)

Solar › Energy in Brief. ... What types and amounts of energy are produced in each state? EIA has data on the types and amounts of energy produced in each state as ...

276

Combined Total Amount of Oil and Gas Recovered Daily from the...  

NLE Websites -- All DOE Office Websites (Extended Search)

Combined Total Amount of Oil and Gas Recovered Daily from the Top Hat and Choke Line oil recovery systems - XLS Combined Total Amount of Oil and Gas Recovered Daily from the Top...

277

Combined Total Amount of Oil and Gas Recovered Daily from the...  

NLE Websites -- All DOE Office Websites (Extended Search)

Combined Total Amount of Oil and Gas Recovered Daily from the Top Hat and Choke Line oil recovery systems - ODS format Combined Total Amount of Oil and Gas Recovered Daily from the...

278

Software Cost Estimation  

E-Print Network (OSTI)

Software cost estimation is the process of predicting the effort required to develop a software system. Many estimation models have been proposed over the last 30 years. This paper provides a general overview of software cost estimation methods including the recent advances in the field. As a number of these models rely on a software size estimate as input, we first provide an overview of common size metrics. We then highlight the cost estimation models that have been proposed and used successfully. Models may be classified into 2 major categories: algorithmic and non-algorithmic. Each has its own strengths and weaknesses. A key factor in selecting a cost estimation model is the accuracy of its estimates. Unfortunately, despite the large body of experience with estimation models, the accuracy of these models is not satisfactory. The paper includes comment on the performance of the estimation models and description of several newer approaches to cost estimation.

Hareton Leung Zhang; Zhang Fan

2002-01-01T23:59:59.000Z

279

EUVL reticle factory model and reticle cost analysis  

SciTech Connect

The key issues in reticle manufacturing are cost and delivery time, both of which are dependent upon the yield of the process line. To estimate the cost and delivery time for EUVL reticles in commercial manufacturing, we have developed the first model for an EUV reticle factory which includes all the tools required for a presumed EUVL reticle fabrication process. This model includes the building, support tools and sufficient ``in-line`` process tools for the manufacture of (more than) 2500 reticles per year. Industry specifications for the tool performance are used to determine the number of tools required per process step and the average number of reticles fabricated per year. Building and capital equipment depreciation costs, tool installation costs, tool maintenance costs, labor, clean room costs, process times and process yields are estimated and used to calculate the yearly operating cost of the reticle factory and the average reticle fabrication cost. We estimate the sales price of an EUV reticle to be $60K for non-critical levels and $120K for ``leading-edge.`` The average reticle fabrication time is calculated for three different process-line yields.

Hawryluk, A.M. [Lawrence Livermore National Lab., CA (United States); Shelden, G. [SEMATECH, Austin, TX (United States); Troccolo, P. [Intel Corp., Santa Clara, CA (United States)

1996-05-22T23:59:59.000Z

280

Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams  

Energy.gov (U.S. Department of Energy (DOE))

$30.6 million Recovery Act investment by the Department of Energy highlights the additional potential of hydro power

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

"2012 Average Monthly Bill- Industrial"  

U.S. Energy Information Administration (EIA) Indexed Site

Industrial" Industrial" "(Data from forms EIA-861- schedules 4A-D, EIA-861S and EIA-861U)" "State","Number of Customers","Average Monthly Consumption (kWh)","Average Price (cents/kWh)","Average Monthly Bill (Dollar and cents)" "New England",34164,67854.037,11.83487,8030.4373 "Connecticut",4647,63947.063,12.672933,8103.9685 "Maine",2780,90741.457,7.9819499,7242.9376 "Massachusetts",21145,66710.826,12.566635,8383.3057 "New Hampshire",3444,47247.217,11.83228,5590.423 "Rhode Island",1927,39935.911,10.676724,4263.8471 "Vermont",221,536044.12,9.9796777,53495.475 "Middle Atlantic",45836,126368.14,7.4903534,9465.42 "New Jersey",12729,50817.89,10.516509,5344.2677

282

"2012 Average Monthly Bill- Residential"  

U.S. Energy Information Administration (EIA) Indexed Site

Residential" Residential" "(Data from forms EIA-861- schedules 4A-D, EIA-861S and EIA-861U)" "State","Number of Customers","Average Monthly Consumption (kWh)","Average Price (cents/kWh)","Average Monthly Bill (Dollar and cents)" "New England",6203726,634.13095,15.713593,99.644755 "Connecticut",1454651,730.85302,17.343298,126.75402 "Maine",703770,530.56349,14.658797,77.774225 "Massachusetts",2699141,627.15845,14.912724,93.52641 "New Hampshire",601697,614.81776,16.070168,98.802249 "Rhode Island",435448,597.34783,14.404061,86.042344 "Vermont",309019,565.03618,17.006075,96.090478 "Middle Atlantic",15727423,700.63673,15.272654,107.00582

283

INVERSIONS FOR AVERAGE SUPERGRANULAR FLOWS USING FINITE-FREQUENCY KERNELS  

Science Conference Proceedings (OSTI)

I analyze the maps recording the travel-time shifts caused by averaged plasma anomalies under an 'average supergranule', constructed by means of statistical averaging over 5582 individual supergranules with large divergence signals detected in two months of Helioseismic and Magnetic Imager Dopplergrams. By utilizing a three-dimensional validated time-distance inversion code, I measure a peak vertical velocity of 117 {+-} 2 m s{sup -1} at depths around 1.2 Mm in the center of the supergranule and a root-mean-square vertical velocity of 21 m s{sup -1} over the area of the supergranule. A discrepancy between this measurement and the measured surface vertical velocity (a few m s{sup -1}) can be explained by the existence of the large-amplitude vertical flow under the surface of supergranules with large divergence signals, recently suggested by Duvall and Hanasoge.

Svanda, Michal, E-mail: michal@astronomie.cz [Astronomical Institute, Academy of Sciences of the Czech Republic (v.v.i.), Fricova 298, CZ-25165 Ondrejov (Czech Republic)

2012-11-10T23:59:59.000Z

284

Globally Averaged Atmospheric CFC-11 Concentrations: Monthly and Annual  

NLE Websites -- All DOE Office Websites (Extended Search)

Chlorofluorocarbons » Chlorofluorocarbons » Atmospheric CFC-11 Concentrations Globally Averaged Atmospheric CFC-11 Concentrations: Monthly and Annual Data for the Period 1975-1992 DOI: 10.3334/CDIAC/atg.db1010 data Data (DB1010) Investigator M. A. K. Khalil and R. A. Rasmussen Description This data set presents globally averaged atmospheric concentrations of chlorofluorocarbon 11, known also as CFC-11 or F-11 (chemical name: trichlorofluoromethane; formula: CCl3F). The monthly global average data are derived from flask air samples collected at eight sites in six locations over the period August 1980-July 1992. The sites are Barrow (Alaska), Cape Meares (Oregon), Cape Kumukahi and Mauna Loa (Hawaii), Cape Matatula (American Samoa), Cape Grim (Tasmania), Palmer Station, and the

285

Lookin g for data personnel costs, indirect costs, equipment costs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Negotiating Group Question/Answer Sessions November 19, 2009 Q: What happens now? A: The negotiation process starts tomorrow [November 20, 2009], when DOE will be sending the Awardees an e-mail with information about which website to go to for clarification and direction, information from the Office of Civil Rights, and answers to some of the questions that came up in the meeting. DOE will be gathering information about the questions concerning cyber requirements, metrics, and reporting requirements and will be getting back to the awardees about those issues the week after Thanksgiving. We have done a review of the budgets, and emails will be sent giving opportunities to address any issues. We will also re-review technical and cost proposals.

286

Bounce-averaged Fokker-Planck code for stellarator transport  

Science Conference Proceedings (OSTI)

A computer code for solving the bounce-averaged Fokker-Planck equation appropriate to stellarator transport has been developed, and its first applications made. The code is much faster than the bounce-averaged Monte-Carlo codes, which up to now have provided the most efficient numerical means for studying stellarator transport. Moreover, because the connection to analytic kinetic theory of the Fokker-Planck approach is more direct than for the Monte-Carlo approach, a comparison of theory and numerical experiment is now possible at a considerably more detailed level than previously.

Mynick, H.E.; Hitchon, W.N.G.

1985-07-01T23:59:59.000Z

287

Flavor Physics Data from the Heavy Flavor Averaging Group (HFAG)  

DOE Data Explorer (OSTI)

The Heavy Flavor Averaging Group (HFAG) was established at the May 2002 Flavor Physics and CP Violation Conference in Philadelphia, and continues the LEP Heavy Flavor Steering Group's tradition of providing regular updates to the world averages of heavy flavor quantities. Data are provided by six subgroups that each focus on a different set of heavy flavor measurements: B lifetimes and oscillation parameters, Semi-leptonic B decays, Rare B decays, Unitarity triangle parameters, B decays to charm final states, and Charm Physics.

Heavy Flavor Averaging Group (HFAG)

288

AMPERE AVERAGE CURRENT PHOTOINJECTOR AND ENERGY RECOVERY LINAC.  

SciTech Connect

High-power Free-Electron Lasers were made possible by advances in superconducting linac operated in an energy-recovery mode. In order to get to much higher power levels, say a fraction of a megawatt average power, many technological barriers are yet to be broken. We describe work on CW, high-current and high-brightness electron beams. This will include a description of a superconducting, laser-photocathode RF gun employing a new secondary-emission multiplying cathode, an accelerator cavity, both capable of producing of the order of one ampere average current and plans for an ERL based on these units.

BEN-ZVI,I.; BURRILL,A.; CALAGA,R.; ET AL.

2004-08-17T23:59:59.000Z

289

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

1 1 July 2012 Short-Term Energy Outlook Highlights * EIA projects the West Texas Intermediate (WTI) crude oil spot price to average about $88 per barrel over the second half of 2012 and the U.S. refiner acquisition cost (RAC) of crude oil to average $93 per barrel, both about $7 per barrel lower than last month's Outlook. EIA expects WTI and RAC crude oil prices to remain roughly at these second half levels in 2013. Beginning in this month's Outlook, EIA is also providing a forecast of Brent crude oil spot prices (see Brent Crude Oil Spot Price Added to Forecast), which are expected to average $106 per barrel for 2012 and $98 per barrel in 2013. These price forecasts assume that world oil-consumption-weighted real gross domestic product

290

Hybrid vehicle potential assessment. Volume 10. Electric and hybrid vehicle cost handbook  

DOE Green Energy (OSTI)

The purpose of this interim cost handbood is to provide a consistent single-point source of data and procedures for estimating the costs of electric and hybrid vehicles. These costs include manufacturing, acquisition (purchase price), operating, and life cycle. Each suggested Cost Estimating Relation (CER) presented herein is a result of the compilation of currently existing cost estimates and cost relationships. No independent cost analysis was performed for this handbook, nor was any analysis performed to rework existing cost data for consistency in all primary assumptions. The cost data is presented in terms of major component and subassembly costs so that any vehicle (electric, hybrid, or conventional) can be costed. The cost estimating relations presented in this handbook are subjective averages of the several independent estimates for each component.

Heft, R.C.; Heller, S.C.

1979-09-30T23:59:59.000Z

291

SOLID OXIDE FUEL CELL MANUFACTURING COST MODEL: SIMULATING RELATIONSHIPS BETWEEN PERFORMANCE, MANUFACTURING, AND COST OF PRODUCTION  

DOE Green Energy (OSTI)

The successful commercialization of fuel cells will depend on the achievement of competitive system costs and efficiencies. System cost directly impacts the capital equipment component of cost of electricity (COE) and is a major contributor to the O and M component. The replacement costs for equipment (also heavily influenced by stack life) is generally a major contributor to O and M costs. In this project, they worked with the SECA industrial teams to estimate the impact of general manufacturing issues of interest on stack cost using an activities-based cost model for anode-supported planar SOFC stacks with metallic interconnects. An earlier model developed for NETL for anode supported planar SOFCs was enhanced by a linkage to a performance/thermal/mechanical model, by addition of Quality Control steps to the process flow with specific characterization methods, and by assessment of economies of scale. The 3-dimensional adiabatic performance model was used to calculate the average power density for the assumed geometry and operating conditions (i.e., inlet and exhaust temperatures, utilization, and fuel composition) based on publicly available polarizations curves. The SECA team provided guidance on what manufacturing and design issues should be assessed in this Phase I demonstration of cost modeling capabilities. They considered the impact of the following parameters on yield and cost: layer thickness (i.e., anode, electrolyte, and cathode) on cost and stress levels, statistical nature of ceramic material failure on yield, and Quality Control steps and strategies. In this demonstration of the capabilities of the linked model, only the active stack (i.e., anode, electrolyte, and cathode) and interconnect materials were included in the analysis. Factory costs are presented on an area and kilowatt basis to allow developers to extrapolate to their level of performance, stack design, materials, seal and system configurations, and internal corporate overheads and margin goals.

Eric J. Carlson; Yong Yang; Chandler Fulton

2004-04-20T23:59:59.000Z

292

Residual Fuel Oil Prices, Average - Sales to End Users  

U.S. Energy Information Administration (EIA) Indexed Site

Product/Sales Type: Residual Fuel, Average - Sales to End Users Residual Fuel, Average - Sales for Resale Sulfur Less Than or Equal to 1% - Sales to End Users Sulfur Less Than or Equal to 1% - Sales for Resale Sulfur Greater Than 1% - Sales to End Users Sulfur Greater Than 1% - Sales for Resale Period: Monthly Annual Product/Sales Type: Residual Fuel, Average - Sales to End Users Residual Fuel, Average - Sales for Resale Sulfur Less Than or Equal to 1% - Sales to End Users Sulfur Less Than or Equal to 1% - Sales for Resale Sulfur Greater Than 1% - Sales to End Users Sulfur Greater Than 1% - Sales for Resale Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Product/Sales Type Area Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History U.S. - - - - - - 1983-2013 East Coast (PADD 1) - - - - - - 1983-2013 New England (PADD 1A) - - - - - - 1983-2013 Connecticut - - - - - - 1983-2013 Maine - - - - - - 1983-2013 Massachusetts - - - - - - 1983-2013

293

Pennsylvania Average Price of Natural Gas Delivered to Residential...  

U.S. Energy Information Administration (EIA) Indexed Site

Percent Sold by Local Distribution Companies 91.2 91.2 2006-2011 Commercial Average Price 12.77 14.29 11.83 10.47 10.42 10.21 1967-2012 Local Distribution Companies 11.29 NA...

294

Michigan Average Price of Natural Gas Delivered to Residential...  

Annual Energy Outlook 2012 (EIA)

8.75 8.56 9.26 11.63 12.68 13.68 1989-2013 Commercial Average Price 7.67 7.51 7.84 8.78 9.69 10.30...

295

HIGH AVERAGE POWER UV FREE ELECTRON LASER EXPERIMENTS AT JLAB  

Science Conference Proceedings (OSTI)

Having produced 14 kW of average power at {approx}2 microns, JLAB has shifted its focus to the ultraviolet portion of the spectrum. This presentation will describe the JLab UV Demo FEL, present specifics of its driver ERL, and discuss the latest experimental results from FEL experiments and machine operations.

Douglas, David; Evtushenko, Pavel; Gubeli, Joseph; Hernandez-Garcia, Carlos; Legg, Robert; Neil, George; Powers, Thomas; Shinn, Michelle D; Tennant, Christopher

2012-07-01T23:59:59.000Z

296

Table WF01. Average Consumer Prices and Expenditures for ...  

U.S. Energy Information Administration (EIA)

Heating Oil U.S. Average Consumption (gallons) 522.7 531.7 572.5 538.2 574.1 465.3 539.9 546.9 1.3 ... Wood 2,094 2,179 2,353 2,424 2,454 2,520 2,582 ...

297

Using Bayesian Model Averaging to Calibrate Forecast Ensembles 1  

E-Print Network (OSTI)

Using Bayesian Model Averaging to Calibrate Forecast Ensembles 1 Adrian E. Raftery, Fadoua forecasting often exhibit a spread-skill relationship, but they tend to be underdispersive. This paper of PDFs centered around the individual (possibly bias-corrected) forecasts, where the weights are equal

Washington at Seattle, University of

298

Spatial analysis based on variance of moving window averages  

E-Print Network (OSTI)

R02 R04 R06 R08 R16 I n Window size B R02 R06 R10 R14 R20R04 R08 R12 R16 R24 R36 I n Window size Wu et al. , Fig. 2Based on Variance of Moving Window Averages B. M. Wu, K. V.

Wu, B M; Subbarao, K V; Ferrandino, F J; Hao, J J

2006-01-01T23:59:59.000Z

299

A Vertically Averaged Circulation Model Using Boundary-Fitted Coordinates  

Science Conference Proceedings (OSTI)

A two-dimensional vertically averaged circulation model using boundary-fitted coordinates has been developed for predicting sea level and currants in estuarine and shelf waters. The basic idea of the approach is to use a set of coupled quasi-...

Malcolm L. Spaulding

1984-05-01T23:59:59.000Z

300

cost | OpenEI  

Open Energy Info (EERE)

cost cost Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Next Vehicle Cost Calculator U.S. Department of Energy Energy Efficiency and Renewable Energy...

302

Electric power transmission and distribution systems: costs and their allocation. Research report  

SciTech Connect

Transmission and distribution costs contribute significantly to the total costs of providing electrical service. The costs derived from the transmission and distribution (TandD) system have historically comprised about 2/3 the costs of producing and delivering electricity to residential-commercial customers, and over 1/3 the total costs supplying electricity to large industrial customers. This report: (1) estimates the differences in transmission and distribution equipment required to serve industrial and residential-commercial customers and allocates to the above two customer classes the average costs of installing this equipment; (2) estimates the costs of operation and maintenance of the transmission and distribution system, and allocates these costs to the customer classes; and (3) calculates the TandD derived average costs for the two customer classes. (GRA)

Baughman, M.L.; Bottaro, D.J.

1975-07-01T23:59:59.000Z

303

COSTS OF NUCLEAR POWER  

SciTech Connect

The discussion on the costs of nuclear power from stationary plants, designed primarily for the generation of electricity. deals with those plants in operation, being built, or being designed for construction at an early date. An attempt is made to consider the power costs on the basis of consistent definitions and assumptions for the various nuclear plants and for comparable fossil-fuel plants. Information on several new power reactor projects is included. (auth)

1961-01-01T23:59:59.000Z

304

High average power diode pumped solid state lasers for CALIOPE  

Science Conference Proceedings (OSTI)

Diode pumping of solid state media offers the opportunity for very low maintenance, high efficiency, and compact laser systems. For remote sensing, such lasers may be used to pump tunable non-linear sources, or if tunable themselves, act directly or through harmonic crystals as the probe. The needs of long range remote sensing missions require laser performance in the several watts to kilowatts range. At these power performance levels, more advanced thermal management technologies are required for the diode pumps. The solid state laser design must now address a variety of issues arising from the thermal loads, including fracture limits, induced lensing and aberrations, induced birefringence, and laser cavity optical component performance degradation with average power loading. In order to highlight the design trade-offs involved in addressing the above issues, a variety of existing average power laser systems are briefly described. Included are two systems based on Spectra Diode Laboratory`s water impingement cooled diode packages: a two times diffraction limited, 200 watt average power, 200 Hz multi-rod laser/amplifier by Fibertek, and TRW`s 100 watt, 100 Hz, phase conjugated amplifier. The authors also present two laser systems built at Lawrence Livermore National Laboratory (LLNL) based on their more aggressive diode bar cooling package, which uses microchannel cooler technology capable of 100% duty factor operation. They then present the design of LLNL`s first generation OPO pump laser for remote sensing. This system is specified to run at 100 Hz, 20 nsec pulses each with 300 mJ, less than two times diffraction limited, and with a stable single longitudinal mode. The performance of the first testbed version will be presented. The authors conclude with directions their group is pursuing to advance average power lasers. This includes average power electro-optics, low heat load lasing media, and heat capacity lasers.

Comaskey, B.; Halpin, J.; Moran, B.

1994-07-01T23:59:59.000Z

305

The Cost of Superconducting Magnets as a Function of Stored Energy and Design Magnetic Induction Times the Field Volume  

E-Print Network (OSTI)

costs given magnet stored-energy or average bore induction timecost will go up with stored energy and with field volume timesCost of Superconducting Magnets as a Function of Stored Energy and Design Magnetic Induction times

Green, M.A.

2008-01-01T23:59:59.000Z

306

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

on Average Retail Electricity Rates.. 14Projected RPS Electricity Rate Impacts by RPS CostRPS Targets and Retail Electricity Rate Impacts 16 Typical

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

307

VGLI Coverage Amount by State as of April 30, 2012 | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

VGLI Coverage Amount by State as of April 30, 2012 VGLI Coverage Amount by State as of April 30, 2012 Consumer Data Apps Challenges Resources About Blogs Let's Talk Feedback Consumer You are here Data.gov » Communities » Consumer » Data VGLI Coverage Amount by State as of April 30, 2012 Dataset Summary Description Provides the amount of Veterans' Group Life Insurance (VGLI) coverage by state. This report provides a snapshot of the amount of VGLI coverage as of April 30, 2012. For members who reside outside the United States, coverage is not identified by individual country. The total amount of coverage was captured to ensure 100% of the population was identified in the report. Tags {Benefits,Insurance,(State,County,etc.)} Dataset Ratings Overall 0 No votes yet Data Utility 0 No votes yet Usefulness 0 No votes yet Ease of Access

308

Nonlocal imaging by conditional averaging of random reference measurements  

E-Print Network (OSTI)

We report the nonlocal imaging of an object by conditional averaging of the random exposure frames of a reference detector, which only sees the freely propagating field from a thermal light source. A bucket detector, synchronized with the reference detector, records the intensity fluctuations of an identical beam passing through the object mask. These fluctuations are sorted according to their values relative to the mean, then the reference data in the corresponding time-bins for a given fluctuation range are averaged, to produce either positive or negative images. Since no correlation calculations are involved, this correspondence imaging technique challenges our former interpretations of "ghost" imaging. Compared with conventional correlation imaging or compressed sensing schemes, both the number of exposures and computation time are greatly reduced, while the visibility is much improved. A simple statistical model is presented to explain the phenomenon.

Kai-Hong Luo; Boqiang Huang; Wei-Mou Zheng; Ling-An Wu

2013-03-22T23:59:59.000Z

309

Database of average-power damage thresholds at 1064 nm  

Science Conference Proceedings (OSTI)

We have completed a database of average-power, laser-induced, damage thresholds at 1064 nm on a variety of materials. Measurements were made with a newly constructed laser to provide design input for moderate and high average-power laser projects. The measurements were conducted with 16-ns pulses at pulse-repetition frequencies ranging from 6 to 120 Hz. Samples were typically irradiated for time ranging from a fraction of a second up to 5 minutes (36,000 shots). We tested seven categories of samples which included antireflective coatings, high reflectors, polarizers, single and multiple layers of the same material, bare and overcoated metal surfaces, bare polished surfaces, and bulk materials. The measured damage threshold ranged from 46 J/cm/sup 2/ for a bare polished glass substrate. 4 refs., 7 figs., 1 tab.

Rainer, F.; Hildum, E.A.; Milam, D.

1987-12-14T23:59:59.000Z

310

Table 8. Average Price of U.S. Coal Exports  

U.S. Energy Information Administration (EIA) Indexed Site

Average Price of U.S. Coal Exports Average Price of U.S. Coal Exports (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Table 8. Average Price of U.S. Coal Exports (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Year to Date Continent and Country of Destination April - June 2013 January - March 2013 April - June 2012 2013 2012 Percent Change North America Total 78.29 77.25 102.62 77.88 105.14 -25.9 Canada* 81.61 80.70 110.67 81.30 112.16 -27.5 Dominican Republic 78.54 75.09 73.89 75.77 76.61 -1.1 Honduras - 54.58 54.43 54.58 54.43 0.3 Jamaica 480.00 54.43 - 54.72 55.42 -1.3 Mexico 73.45 75.81 94.36 74.35 100.95 -26.3 Other** 80.33 389.30 70.37 82.45 76.10 8.3 South America Total 107.72 108.02 149.99 107.88

311

Table 17. Average Price of U.S. Coke Exports  

U.S. Energy Information Administration (EIA) Indexed Site

Average Price of U.S. Coke Exports Average Price of U.S. Coke Exports (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Table 17. Average Price of U.S. Coke Exports (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Year to Date Continent and Country of Destination April - June 2013 January - March 2013 April - June 2012 2013 2012 Percent Change North America Total 240.59 241.38 218.40 240.85 225.80 6.7 Canada* 147.49 330.47 243.04 183.08 286.56 -36.1 Mexico 316.57 211.63 189.12 273.97 171.71 59.6 Other** 612.42 485.63 134.48 525.92 135.04 289.5 South America Total 140.65 156.15 322.70 148.29 250.36 -40.8 Other** 140.65 156.15 322.70 148.29 250.36 -40.8 Europe Total 259.26 255.24 - 257.06 427.83 -39.9 Other**

312

Probability density function transformation using seeded localized averaging  

SciTech Connect

Seeded Localized Averaging (SLA) is a spectrum acquisition method that averages pulse-heights in dynamic windows. SLA sharpens peaks in the acquired spectra. This work investigates the transformation of the original probability density function (PDF) in the process of applying SLA procedure. We derive an analytical expression for the resulting probability density function after an application of SLA. In addition, we prove the following properties: 1) for symmetric distributions, SLA preserves both the mean and symmetry. 2) for uni-modal symmetric distributions, SLA reduces variance, sharpening the distributions peak. Our results are the first to prove these properties, reinforcing past experimental observations. Specifically, our results imply that in the typical case of a spectral peak with Gaussian PDF the full width at half maximum (FWHM) of the transformed peak becomes narrower even with averaging of only two pulse-heights. While the Gaussian shape is no longer preserved, our results include an analytical expression for the resulting distribution. Examples of the transformation of other PDFs are presented. (authors)

Dimitrov, N. B. [Operations Research Dept., Naval Postgraduate School, Monterey, CA 93943 (United States); Jordanov, V. T. [Yantel, LLC, Santa Fe, NM 87508 (United States)

2011-07-01T23:59:59.000Z

313

Table 22. Average Price of U.S. Coke Imports  

U.S. Energy Information Administration (EIA) Indexed Site

Average Price of U.S. Coke Imports Average Price of U.S. Coke Imports (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Table 22. Average Price of U.S. Coke Imports (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Year to Date Continent and Country of Origin April - June 2013 January - March 2013 April - June 2012 2013 2012 Percent Change North America Total 263.21 252.66 353.05 261.29 356.01 -26.6 Canada 263.51 252.66 353.05 258.82 356.01 -27.3 Panama 263.09 - - 263.09 - - South America Total 196.86 194.14 175.88 195.94 181.01 8.2 Brazil - - 157.60 - 157.60 - Colombia 196.86 194.14 322.06 195.94 246.68 -20.6 Europe Total 181.55 232.13 385.65 225.53 384.96 -41.4 Czech Republic - 475.91 - 475.91 - - Spain 360.51

314

Cost Effectiveness of Electricity Energy Efficiency Programs | Open Energy  

Open Energy Info (EERE)

Cost Effectiveness of Electricity Energy Efficiency Programs Cost Effectiveness of Electricity Energy Efficiency Programs Jump to: navigation, search Tool Summary Name: Cost Effectiveness of Electricity Energy Efficiency Programs Agency/Company /Organization: Resources for the Future Sector: Energy Focus Area: Energy Efficiency Topics: Finance Resource Type: Publications Website: www.rff.org/RFF/Documents/RFF-DP-09-48.pdf Cost Effectiveness of Electricity Energy Efficiency Programs Screenshot References: Cost Effectiveness of Electricity Energy Efficiency Programs[1] Abstract "We analyze the cost-effectiveness of electric utility rate payer-funded programs to promote demand-side management (DSM) and energy efficiency investments. We develop a conceptual model that relates demand growth rates to accumulated average DSM capital per customer and changes in energy

315

Wind turbine cost of electricity and capacity factor  

Science Conference Proceedings (OSTI)

Wind turbines are currently designed to minimize the cost of electricity at the wind turbine (the busbar cost) in a given wind regime, ignoring constraints on the capacity factor (the ratio of the average power output to the maximum power output). The trade-off between these two quantities can be examined in a straightforward fashion; it is found that the capacity factor can be increased by a factor of 30 percent above its value at the cost minimum for a ten percent increase in the busbar cost of electricity. This has important implications for the large-scale integration of wind electricity on utility grids where the cost of transmission may be a significant fraction of the cost of delivered electricity, or where transmission line capacity may be limited.

Cavallo, A.J. [Cavallo (A.J.), Princeton, NJ (United States)

1997-11-01T23:59:59.000Z

316

Roadway Improvement Project Cost Allocation  

E-Print Network (OSTI)

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

317

Wind Electrolysis: Hydrogen Cost Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

which needs to be 44% or better along with relatively high wind speeds. Along with low production costs, however, delivery and storage costs will also factor into the final cost...

318

Power Plant Cycling Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Plant Cycling Costs Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Subcontract Report NREL/SR-5500-55433 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Prepared under Subcontract No. NFT-1-11325-01

319

INDEPENDENT COST REVIEW (ICR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

320

INDEPENDENT COST REVIEW (ICR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Understanding waste phenomenology to reduce the amount of sampling and analysis required to resolve Hanford waste tank safety issues  

SciTech Connect

Safety issues associated with Hanford Site waste tanks arose because of inadequate safety analyses and high levels of uncertainty over the release of radioactivity resulting from condensed phase exothermic chemical reactions (organic solvent fires, organic complexant-nitrate reactions, and ferrocyanide-nitrate reactions). The approach to resolving the Organic Complexant, Organic Solvent, and Ferrocyanide safety issues has changed considerably since 1990. The approach formerly utilized core sampling and extensive analysis of the samples with the expectation the data would provide insight into the hazard. This resulted in high costs and the generation of a large amount of data that was of limited value in resolving the safety issues. The new approach relies on an understanding of the hazard phenomenology to focus sampling and analysis on those analytes that are key to ensuring safe storage of the waste.

Meacham, J.E.; Babad, H.

1996-02-01T23:59:59.000Z

322

Optimal Power Cost Management Using Stored Energy in Data Centers  

E-Print Network (OSTI)

Since the electricity bill of a data center constitutes a significant portion of its overall operational costs, reducing this has become important. We investigate cost reduction opportunities that arise by the use of uninterrupted power supply (UPS) units as energy storage devices. This represents a deviation from the usual use of these devices as mere transitional fail-over mechanisms between utility and captive sources such as diesel generators. We consider the problem of opportunistically using these devices to reduce the time average electric utility bill in a data center. Using the technique of Lyapunov optimization, we develop an online control algorithm that can optimally exploit these devices to minimize the time average cost. This algorithm operates without any knowledge of the statistics of the workload or electricity cost processes, making it attractive in the presence of workload and pricing uncertainties. An interesting feature of our algorithm is that its deviation from optimality reduces as the...

Urgaonkar, Rahul; Neely, Michael J; Sivasubramaniam, Anand

2011-01-01T23:59:59.000Z

323

Production Cost Optimization Assessments  

Science Conference Proceedings (OSTI)

The benefits of improved thermal performance of coal-fired power plants continue to grow, as the costs of fuel rise and the prospect of a carbon dioxide cap and trade program looms on the horizon. This report summarizes the efforts to date of utilities committed to reducing their heat rate by 1.0% in the Production Cost Optimization (PCO) Project. The process includes benchmarking of plant thermal performance using existing plant data and a site-specific performance appraisal. The appraisal determines po...

2008-12-11T23:59:59.000Z

324

Low Cost, Durable Seal  

SciTech Connect

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

325

So how much will it cost to build a nuke?  

SciTech Connect

Trying to get a better understanding of the different estimates of the cost of nuclear power, Prof. Francois Leveque of Mines ParisTech and Marcelo Saguan of Microeconomix examined seven studies published since 2000. They examined levelized cost, which captures the cost of electricity generation from nuclear reactors over the entire life cycle, including initial investment costs, operations and maintenance costs, cost of fuel, cost of capital, and decommissioning. The results, in 2007 euro/MWh, vary from 18 to 80. Making matters worse, more recent studies show an upward trend: the average value for studies published in 2003--05 is about 43 euro/MWh, while those published in 2007--09 average 63 euro2007/MWh. One reason for the different results is different assumptions about the main cost drivers and how they may vary over time. With the advent of third-generation nuclear reactors, numbers in the range of $1,000/kW (approx. 750 euro/kW) were being tossed around, suggesting a $1 billion investment for a 1,000 MW plant. A 2003 MIT study assumed an overnight cost of 1,750 euro/kW, with later studies raising the numbers to 3,000 euro/kW (approx. US$ 4,500). In 2008, Progress Energy Florida put the price tag for 2 new reactors it is planning to build on the Gulf Coast of Florida at $14 billion with another $3 billion for transmission and related expenses. Likewise, Florida Power & Light figures it would cost $20 billion for 2 new reactors at its Turkey Point site in Florida. These higher cost estimates and significant uncertainties about the true costs pose serious challenges to the competitiveness of nuclear power.

NONE

2010-01-15T23:59:59.000Z

326

Drilling and blasting techniques and costs for strip mines in Appalachia  

SciTech Connect

On-site investigations of blasting techniques were conducted at twenty surface coal mining operations in the steep slopes of Appalachia. The mine sites represented a range of mountain mining methods and annual coal production levels; all sites used similar techniques and equipment for the removal of fragmented waste rock. Hole loading characteristics and constraints limiting blast designs were observed at each mine site. This report summarizes technical blasting data and geological conditions which require special design considerations. Three mine sites were selected for future research in fragmentation efficiency. Detailed economic data on drilling and blasting were gathered from the three research sites and are reported herein. A great deal of fragmentation difficulties stem from tough, unpredictable geology with specific bedding characteristics and local zones of defined structural weaknesses such as jointing and vertical seams. Exceptionally hard bedrock, existing as a caprock or as the basal layer above the coal seam, persists as the cause of oversize rock breakage or, in the latter case, damage to the coal unless special precautions are taken. Federal blasting regulations strictly control the amount of explosives used as well as throw of the fragmented rock. This requires that blasting modifications be employed. The nature and extent of blast modifications were observed to be related to terrain and demographic conditions around the mine site. Drilling and blasting costs reported for the three mine sites averaged $0.21 per cubic yard of material blasted. Drilling costs varied widely, as drilling time was indicative of geologies and often, drilling costs remained the greatest percentage of total blasting and drilling costs.

Aimone, C.T.

1980-06-01T23:59:59.000Z

327

Coking Coal Import Costs - EIA  

Gasoline and Diesel Fuel Update (EIA)

Import Costs for Selected Countries Import Costs for Selected Countries U.S. Dollars per Metric Ton1 (Average Unit Value, CIF2) Country 2001 2002 2003 2004 2005 2006 2007 2008 2009 Belgium 48.67 46.59 49.25 78.98 108.68 126.85 120.51 163.26 NA France 52.47 60.26 62.05 75.46 109.69 133.48 124.63 212.51 NA Germany 51.30 59.53 64.00 74.74 113.48 135.72 133.45 182.72 NA Italy 55.48 57.67 60.39 77.24 103.02 112.05 118.05 118.97 NA Japan 41.13 42.14 41.73 61.40 88.80 93.10 88.43 184.13 NA Netherlands 55.37 55.55 63.00 78.99 104.06 125.70 125.84 187.06 NA Spain 52.32 57.10 60.44 79.30 116.50 134.81 124.87 211.23 NA United Kingdom 53.14 56.81 57.34 77.73 116.05 128.51 120.24 187.79 NA 1To convert U.S. dollars per metric ton to U.S. dollars per short ton

328

Steam Coal Import Costs - EIA  

Gasoline and Diesel Fuel Update (EIA)

Steam Coal Import Costs for Selected Countries Steam Coal Import Costs for Selected Countries U.S. Dollars per Metric Ton1 (Average Unit Value, CIF2) Country 2001 2002 2003 2004 2005 2006 2007 2008 2009 Belgium 46.96 39.34 39.76 66.29 70.83 70.95 82.81 150.58 NA Denmark 40.78 31.65 50.27 56.29 61.84 59.15 75.20 113.34 NA Finland 40.83 37.08 39.99 58.45 62.80 67.65 72.64 134.21 NA France 45.36 42.59 42.63 64.08 75.23 72.92 84.49 135.53 NA Germany 41.46 36.80 39.00 61.22 72.48 70.12 81.49 138.84 NA Ireland3 45.25 47.88 50.08 80.90 74.91 101.78 125.15 143.08 NA Italy 44.83 41.25 42.45 63.54 73.20 69.16 86.00 143.68 NA Japan 37.95 36.95 34.93 51.48 62.73 63.33 70.92 125.42 NA Netherlands 40.09 35.81 37.27 55.09 68.86 68.57 79.12 133.50 NA

329

Controlling the amount of physical activity in a specific exertion interface  

Science Conference Proceedings (OSTI)

We present the empirical validation of a system that controls the amount of physical activity that children do while playing in a specific exertion interface called the Interactive Slide. The control of the amount of physical activity is done through ... Keywords: children, exergame, exertion interface, health, mixed reality, physical activity, sedentarism, user control

Pascal Landry; Narcis Pares

2012-05-01T23:59:59.000Z

330

Average waiting time profiles of uniform DQDB model  

SciTech Connect

The Distributed Queue Dual Bus (DQDB) system consists of a linear arrangement of N nodes that communicate with each other using two contra-flowing buses; the nodes use an extremely simple protocol to send messages on these buses. This simple, but elegant, system has been found to be very challenging to analyze. We consider a simple and uniform abstraction of this model to highlight the fairness issues in terms of average waiting time. We introduce a new approximation method to analyze the performance of DQDB system in terms of the average waiting time of a node expressed as a function of its position. Our approach abstracts the intimate relationship between the load of the system and its fairness characteristics, and explains all basic behavior profiles of DQDB observed in previous simulation. For the uniform DQDB with equal distance between adjacent nodes, we show that the system operates under three basic behavior profiles and a finite number of their combinations that depend on the load of the network. Consequently, the system is not fair at any load in terms of the average waiting times. In the vicinity of a critical load of 1 {minus} 4/N, the uniform network runs into a state akin to chaos, where its behavior fluctuates from one extreme to the other with a load variation of 2/N. Our analysis is supported by simulation results. We also show that the main theme of the analysis carries over to the general (non-uniform) DQDB; by suitably choosing the inter-node distances, the DQDB can be made fair around some loads, but such system will become unfair as the load changes.

Rao, N.S.V. [Oak Ridge National Lab., TN (United States); Maly, K.; Olariu, S.; Dharanikota, S.; Zhang, L.; Game, D. [Old Dominion Univ., Norfolk, VA (United States). Dept. of Computer Science

1993-09-07T23:59:59.000Z

331

Status of Average-x from Lattice QCD  

Science Conference Proceedings (OSTI)

As algorithms and computing power have advanced, lattice QCD has become a precision technique for many QCD observables. However, the calculation of nucleon matrix elements remains an open challenge. I summarize the status of the lattice effort by examining one observable that has come to represent this challenge, average-x: the fraction of the nucleon's momentum carried by its quark constituents. Recent results confirm a long standing tendency to overshoot the experimentally measured value. Understanding this puzzle is essential to not only the lattice calculation of nucleon properties but also the broader effort to determine hadron structure from QCD.

Dru Renner

2011-09-01T23:59:59.000Z

332

Long-term average performance benefits of parabolic trough improvements  

DOE Green Energy (OSTI)

Improved parabolic trough concentrating collectors will result from better design, improved fabrication techniques, and the development and utilization of improved materials. This analysis quantifies the relative merit of various technological advancements in improving the long-term average performance of parabolic trough concentrating collectors and presents them graphically as a function of operating temperature for north-south, east-west, and polar mounted parabolic troughs. Substantial annual energy gains (exceeding 50% at 350/sup 0/C) are shown to be attainable with improved parabolic troughs.

Gee, R.; Gaul, H.; Kearney, D.; Rabl, A.

1979-10-01T23:59:59.000Z

333

Service Provider Competition: Delay Cost Structure, Segmentation, and Cost Advantage  

Science Conference Proceedings (OSTI)

We model competition between two providers who serve delay-sensitive customers. We compare a generalized delay cost structure, where a customer's delay cost depends on her service valuation, with the traditional additive delay cost structure, where the ... Keywords: delay cost structure, service competition, value-based market segmentation

Maxim Afanasyev; Haim Mendelson

2010-04-01T23:59:59.000Z

334

Heliostat cost reduction study.  

DOE Green Energy (OSTI)

Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

2007-06-01T23:59:59.000Z

335

High average power CW FELs (Free Electron Laser) for application to plasma heating: Designs and experiments  

SciTech Connect

A short period wiggler (period {approximately} 1 cm), sheet beam FEL has been proposed as a low-cost source of high average power (1 MW) millimeter-wave radiation for plasma heating and space-based radar applications. Recent calculation and experiments have confirmed the feasibility of this concept in such critical areas as rf wall heating, intercepted beam ( body'') current, and high voltage (0.5 - 1 MV) sheet beam generation and propagation. Results of preliminary low-gain sheet beam FEL oscillator experiments using a field emission diode and pulse line accelerator have verified that lasing occurs at the predicted FEL frequency. Measured start oscillation currents also appear consistent with theoretical estimates. Finally, we consider the possibilities of using a short-period, superconducting planar wiggler for improved beam confinement, as well as access to the high gain, strong pump Compton regime with its potential for highly efficient FEL operation.

Booske, J.H.; Granatstein, V.L.; Radack, D.J.; Antonsen, T.M. Jr.; Bidwell, S.; Carmel, Y.; Destler, W.W.; Latham, P.E.; Levush, B.; Mayergoyz, I.D.; Zhang, Z.X. (Maryland Univ., College Park, MD (USA). Lab. for Plasma Research); Freund, H.P. (Science Applications International Corp., McLean, VA (USA))

1989-01-01T23:59:59.000Z

336

Thermodynamic cost of acquiring information  

E-Print Network (OSTI)

Connections between information theory and thermodynamics have proven to be very useful to establish bounding limits for physical processes. Ideas such as Landauer's erasure principle and information assisted work extraction have greatly contributed not only to enlarge our understanding about the fundamental limits imposed by nature, but also to enlighten the path for practical implementations of information processing devices. The intricate information-thermodynamics relation also entails a fundamental limit on parameter estimation, establishing a thermodynamic cost for information acquisition. More specifically, we show that the amount of information that can be encoded in a physical system (and consequently extracted) by means of any process is limited by the dissipated work during the implementation of the process. This includes a thermodynamic trade-off for information acquisition. Likewise, any information acquisition process is ultimately limited by the second law of thermodynamics. Such a trade-off may find applications in several areas of knowledge, since parameter estimation lies in the building basis of all natural sciences and several technological applications, such as metrology.

Kaonan Micadei; Roberto M. Serra; Lucas C. Celeri

2012-11-02T23:59:59.000Z

337

Load-curve responsiveness to weather and the cost-effectiveness of conservation  

SciTech Connect

A cost-benefit analysis of home-weatherization projects using average incremental power costs instead of peak or off-peak costs shows that some programs are no longer cost-effective. Weatherization improves the energy efficiency of houses and reduces demand on the utility, but a study of how monthly load curves at a Pacific Northwest utility responded to weather over a 12-month period indicates that abnormal weather shifts the entire load curve. 1 figure. (DCK)

Hellman, M.M.

1982-09-30T23:59:59.000Z

338

Table 14a. Average Electricity Prices, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

a. Average Electricity Prices, Projected vs. Actual a. Average Electricity Prices, Projected vs. Actual Projected Price in Constant Dollars (constant dollars, cents per kilowatt-hour in "dollar year" specific to each AEO) AEO Dollar Year 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1995 1993 6.80 6.80 6.70 6.70 6.70 6.70 6.70 6.80 6.80 6.90 6.90 6.90 7.00 7.00 7.10 7.10 7.20 AEO 1996 1994 7.09 6.99 6.94 6.93 6.96 6.96 6.96 6.97 6.98 6.97 6.98 6.95 6.95 6.94 6.96 6.95 6.91 AEO 1997 1995 6.94 6.89 6.90 6.91 6.86 6.84 6.78 6.73 6.66 6.60 6.58 6.54 6.49 6.48 6.45 6.36

339

A high average power electro-optic switch using KTP  

SciTech Connect

High damage threshold, high thermal conductivity, and small thermo-optic coefficients make KTiOPO{sub 4} (KTP) an attractive material for use in a high average power Q-switch. However, electro-chromic damage and refractive index homogeneity have prevented the utilization of KTP in such a device in the past. This work shows that electro-chromic damage is effectively suppressed using capacitive coupling, and a KTP crystal can be Q-switched for 1.5 {times} 10{sup 9} shots without any detectable electro-chromic damage. In addition, KTP with the high uniformity and large aperture size needed for a KTP electro-optic Q-switch can be obtained from flux crystals grown at constant temperature. A thermally compensated, dual crystal KTP Q-switch, which successfully produced 50 mJ pulses with a pulse width of 8 ns (FWHM), has been constructed. In addition, in off-line testing the Q-switch showed less than 7% depolarization at an average power loading of 3.2 kW/cm{sup 2}.

Ebbers, C.A.; Cook, W.M.; Velsko, S.P.

1994-04-01T23:59:59.000Z

340

[Global warming and the running average sunspot number  

SciTech Connect

It has been reported in your pages that the Bush administration`s views and actions regarding how or whether to react to possible global warming due to greenhouse gases have been influenced by the so-called Marshall report. This unrefereed report, released by the George C. Marshall Institute, had as its principal conclusion the finding that the 0.5{degree} C global warming of the last century was mostly due to solar variability and, thus, the greenhouse warming of the 21st century can be expected to be a relatively small l{degree} C or so. The authors support this finding by comparing the 33-year running average sunspot number with the trend in annual average global temperature and noting the parallel between the two, especially during the 1940s--1960s when the temperature trend was downward. Subsequent letters to Science debated the merits of this and other conclusions contained in the report. I now present additional technical evidence which shows that, quite aside from the question of whether the data presented in the report support its conclusions, the actual figure on which the above conclusion is based is in error.

Fernau, M.E.

1994-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Calculations of nonspherically averaged charge densities for subtitutionally disordered alloys  

Science Conference Proceedings (OSTI)

Based on screening transformations of muffin-tin orbitals introduced by Andersen et al. [Phys. Rev. Lett. 53, 2571 (1984)], we have developed a formalism for calculating the non-spherically averaged charge densities of substitutionally disordered alloys using the Korringa-Kohn-Rostoker coherent potential approximation (KKR CPA) method in the atomic-sphere approximation (ASA). We have validated our method by calculating charge densities for ordered structures, where we find that our approach yields charge densities that are essentially indistinguishable from the results of full-potential methods. For substitutionally disordered alloys, where full-potential methods have not been implemented so far, our approach can be used to calculate reliable non-spherically averaged charge densities from spherically symmetric one-electron potentials obtained from the KKR-ASA CPA. We report on our study of differences in charge denisty between ordered AlLi in L1{sub o} phase and substitutionally disordered Al{sub 0.5}Li{sub 0.5} on face-centered cubic lattice.

Singh, P.P.; Gonis, A.

1994-02-01T23:59:59.000Z

342

Plasma dynamics and a significant error of macroscopic averaging  

E-Print Network (OSTI)

The methods of macroscopic averaging used to derive the macroscopic Maxwell equations from electron theory are methodologically incorrect and lead in some cases to a substantial error. For instance, these methods do not take into account the existence of a macroscopic electromagnetic field EB, HB generated by carriers of electric charge moving in a thin layer adjacent to the boundary of the physical region containing these carriers. If this boundary is impenetrable for charged particles, then in its immediate vicinity all carriers are accelerated towards the inside of the region. The existence of the privileged direction of acceleration results in the generation of the macroscopic field EB, HB. The contributions to this field from individual accelerated particles are described with a sufficient accuracy by the Lienard-Wiechert formulas. In some cases the intensity of the field EB, HB is significant not only for deuteron plasma prepared for a controlled thermonuclear fusion reaction but also for electron plasma in conductors at room temperatures. The corrected procedures of macroscopic averaging will induce some changes in the present form of plasma dynamics equations. The modified equations will help to design improved systems of plasma confinement.

Marek A. Szalek

2005-05-22T23:59:59.000Z

343

Yearly average performance of the principal solar collector types  

DOE Green Energy (OSTI)

The results of hour-by-hour simulations for 26 meteorological stations are used to derive universal correlations for the yearly total energy that can be delivered by the principal solar collector types: flat plate, evacuated tubes, CPC, single- and dual-axis tracking collectors, and central receiver. The correlations are first- and second-order polynomials in yearly average insolation, latitude, and threshold (= heat loss/optical efficiency). With these correlations, the yearly collectible energy can be found by multiplying the coordinates of a single graph by the collector parameters, which reproduces the results of hour-by-hour simulations with an accuracy (rms error) of 2% for flat plates and 2% to 4% for concentrators. This method can be applied to collectors that operate year-around in such a way that no collected energy is discarded, including photovoltaic systems, solar-augmented industrial process heat systems, and solar thermal power systems. The method is also recommended for rating collectors of different type or manufacturer by yearly average performance, evaluating the effects of collector degradation, the benefits of collector cleaning, and the gains from collector improvements (due to enhanced optical efficiency or decreased heat loss per absorber surface). For most of these applications, the method is accurate enough to replace a system simulation.

Rabl, A.

1981-01-01T23:59:59.000Z

344

Estimating decommissioning costs: The 1994 YNPS decommissioning cost study  

Science Conference Proceedings (OSTI)

Early this year, Yankee Atomic Electric Company began developing a revised decommissioning cost estimate for the Yankee Nuclear Power Station (YNPS) to provide a basis for detailed decommissioning planning and to reflect slow progress in siting low-level waste (LLW) and spent-nuclear-fuel disposal facilities. The revision also reflects the need to change from a cost estimate that focuses on overall costs to a cost estimate that is sufficiently detailed to implement decommissioning and identify the final cost of decommissioning.

Szymczak, W.J.

1994-12-31T23:59:59.000Z

345

Percent of 2010 Luminaire Cost LED Luminaire Cost  

E-Print Network (OSTI)

LEDs promise to change the world, and few doubt that they will, but a key limiter to more rapid adoption is the cost of the LED themselves. The cost breakdown of LED luminaires vary, but it is safe to put the cost of the LED at around 25% to 40 % of the total luminaire cost. It is projected to remain a significant cost of the total luminaire for many years.

unknown authors

2012-01-01T23:59:59.000Z

346

Federal Energy Management Program: Life Cycle Cost Analysis for Sustainable  

NLE Websites -- All DOE Office Websites (Extended Search)

Life Cycle Cost Analysis for Sustainable Buildings Life Cycle Cost Analysis for Sustainable Buildings To help facility managers make sound decisions, FEMP provides guidance and resources on applying life cycle cost analysis (LCCA) to evaluate the cost-effectiveness of energy and water efficiency investments. Federal Requirements Life cycle cost (LCC) rules are promulgated in 10 CFR 436 A, Life Cycle Cost Methodology and Procedures and conforms to requirements in the National Energy Conservation Policy Act and subsequent energy conservation legislation as well as Executive Order 13423. The LCC guidance and materials provided here assume discount rates and energy price projections (TXT 17 KB) determined annually by FEMP and the Energy Information Administration. Building Life Cycle Cost Software FEMP's Building Life Cycle Cost (BLCC) software can help you calculate life cycle costs, net savings, savings-to-investment ratio, internal rate of return, and payback period for Federal energy and water conservation projects funded by agencies or alternatively financed. BLCC also estimates emissions and emission reductions. An energy escalation rate calculator (EERC) computes an average escalation rate for energy savings performance contracts when payments are based on energy cost savings.

347

Production cost analysis of Euphorbia lathyris. Final report  

DOE Green Energy (OSTI)

The purpose of this study is to estimate costs of production for Euphorbia lathyris (hereafter referred to as Euphorbia) in commercial-scale quantities. Selection of five US locations for analysis was based on assumed climatic and cultivation requirements. The five areas are: nonirrigated areas (Southeast Kansas and Central Oklahoma, Northeast Louisiana and Central Mississippi, Southern Illinois), and irrigated areas: (San Joaquin Valley and the Imperial Valley, California and Yuma, Arizona). Cost estimates are tailored to reflect each region's requirements and capabilities. Variable costs for inputs such as cultivation, planting, fertilization, pesticide application, and harvesting include material costs, equipment ownership, operating costs, and labor. Fixed costs include land, management, and transportation of the plant material to a conversion facility. Euphorbia crop production costs, on the average, range between $215 per acre in nonirrigated areas to $500 per acre in irrigated areas. Extraction costs for conversion of Euphorbia plant material to oil are estimated at $33.76 per barrel of oil, assuming a plant capacity of 3000 dry ST/D. Estimated Euphorbia crop production costs are competitive with those of corn. Alfalfa production costs per acre are less than those of Euphorbia in the Kansas/Oklahoma and Southern Illinois site, but greater in the irrigated regions. This disparity is accounted for largely by differences in productivity and irrigation requirements.

Mendel, D.A.

1979-08-01T23:59:59.000Z

348

Production cost analysis of Euphorbia lathyris. Final report  

SciTech Connect

The purpose of this study is to estimate costs of production for Euphorbia lathyris (hereafter referred to as Euphorbia) in commercial-scale quantities. Selection of five US locations for analysis was based on assumed climatic and cultivation requirements. The five areas are: nonirrigated areas (Southeast Kansas and Central Oklahoma, Northeast Louisiana and Central Mississippi, Southern Illinois), and irrigated areas: (San Joaquin Valley and the Imperial Valley, California and Yuma, Arizona). Cost estimates are tailored to reflect each region's requirements and capabilities. Variable costs for inputs such as cultivation, planting, fertilization, pesticide application, and harvesting include material costs, equipment ownership, operating costs, and labor. Fixed costs include land, management, and transportation of the plant material to a conversion facility. Euphorbia crop production costs, on the average, range between $215 per acre in nonirrigated areas to $500 per acre in irrigated areas. Extraction costs for conversion of Euphorbia plant material to oil are estimated at $33.76 per barrel of oil, assuming a plant capacity of 3000 dry ST/D. Estimated Euphorbia crop production costs are competitive with those of corn. Alfalfa production costs per acre are less than those of Euphorbia in the Kansas/Oklahoma and Southern Illinois site, but greater in the irrigated regions. This disparity is accounted for largely by differences in productivity and irrigation requirements.

Mendel, D.A.

1979-08-01T23:59:59.000Z

349

Regional comparison of nuclear and fossil electric power generation costs  

SciTech Connect

Nuclear's main disadvantages are its high capital investment cost and uncertainty in schedule compared with alternatives. Nuclear plant costs continue to rise whereas coal plant investment costs are staying relative steady. Based on average experience, nuclear capital investment costs are nearly double those of coal-fired generation plants. The capital investment cost disadvantage of nuclear is balanced by its fuel cost advantages. New base load nuclear power plants were projected to be competitive with coal-fired plants in most regions of the country. Nuclear power costs wre projected to be significantly less (10% or more) than coal-fired power costs in the South Atlantic region. Coal-fired plants were projected to have a significant economic advantage over nuclear plants in the Central and North Central regions. In the remaining seven regions, the levelized cost of power from either option was projected to be within 10%. Uncertainties in future costs of materials, services, and financing affect the relative economics of the nuclear and coal options significantly. 10 figures.

Bowers, H.I.

1984-01-01T23:59:59.000Z

350

costs | OpenEI  

Open Energy Info (EERE)

7 7 Varnish cache server costs Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (11 months ago) Date Updated March 04th, 2013 (11 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

351

Network-based consensus averaging with general noisy channels  

E-Print Network (OSTI)

This paper focuses on the consensus averaging problem on graphs under general noisy channels. We study a particular class of distributed consensus algorithms based on damped updates, and using the ordinary differential equation method, we prove that the updates converge almost surely to exact consensus for finite variance noise. Our analysis applies to various types of stochastic disturbances, including errors in parameters, transmission noise, and quantization noise. Under a suitable stability condition, we prove that the error is asymptotically Gaussian, and we show how the asymptotic covariance is specified by the graph Laplacian. For additive parameter noise, we show how the scaling of the asymptotic MSE is controlled by the spectral gap of the Laplacian.

Rajagopal, Ram

2008-01-01T23:59:59.000Z

352

Climate: monthly and annual average relative humidity GIS data at  

Open Energy Info (EERE)

relative humidity GIS data at relative humidity GIS data at one-degree resolution of the World from NASA/SSE Dataset Summary Description (Abstract): Relative Humidity at 10 m Above The Surface Of The Earth (%)NASA Surface meteorology and Solar Energy (SSE) Release 6.0 Data Set (Nov 2007)22-year Monthly & Annual Average (July 1983 - June 2005)Parameter: Relative Humidity at 10 m Above The Surface Of The Earth (%)Internet: http://eosweb.larc.nasa.gov/sse/Note 1: SSE Methodology & Accuracy sections onlineNote 2: Lat/Lon values indicate the lower left corner of a 1x1 degree region. Negative values are south and west; positive values are north and east. Boundaries of the -90/-180 region are -90 to -89 (south) and -180 to -179 (west). The last region, 89/180, is bounded by 89 to 90 (north) and 179 to 180 (east). The mid-point of

353

Geothermal probabilistic cost study  

DOE Green Energy (OSTI)

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

1981-08-01T23:59:59.000Z

354

Cost Study Manual | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cost Study Manual Cost Study Manual Update 62912. Memo regarding Cost Study Manual Cost Study Manual More Documents & Publications Technical Standards, Newsletter-June 1999 Build...

355

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network (OSTI)

E. Hydrogen Supply: Cost Estimate for Hydrogen Pathways -costs are compared with cost estimates of similar stationsHydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

356

Observational and Model Estimates of Cloud Amount Feedback over the Indian and Pacific Oceans  

Science Conference Proceedings (OSTI)

Constraining intermodel spread in cloud feedback with observations is problematic because available cloud datasets are affected by spurious behavior in long-term variability. This problem is addressed by examining cloud amount in three independent ...

Katinka Bellomo; Amy C. Clement; Joel R. Norris; Brian J. Soden

2014-01-01T23:59:59.000Z

357

How Do You Reduce the Amount of Energy Used by Your Televisions? |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Amount of Energy Used by Your Televisions? the Amount of Energy Used by Your Televisions? How Do You Reduce the Amount of Energy Used by Your Televisions? December 30, 2010 - 6:30am Addthis On Monday, John told you about some changes to television labeling that will help you compare the energy use of different models when you're shopping. Many households have more than one television, and many of those televisions are always on! Unless you're paying attention, that could add up to a lot of energy use-and a higher electricity bill. How do you reduce the amount of energy used by your televisions? Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov.

358

Combined Total Amount of Oil and Gas Recovered Daily from the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

XLS Combined Total Amount of Oil and Gas Recovered Daily from the Top Hat and Choke Line oil recovery systems - XLS Updated through 12:00 AM on July 16, 2010. 52Item84Recovery...

359

Combined Total Amount of Oil and Gas Recovered Daily from the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ODS format Combined Total Amount of Oil and Gas Recovered Daily from the Top Hat and Choke Line oil recovery systems - ODS format Updated through 12:00 AM on July 16, 2010....

360

Evaluation of Probabilistic Precipitation Forecasts Determined from Eta and AVN Forecasted Amounts  

Science Conference Proceedings (OSTI)

This note examines the connection between the probability of precipitation and forecasted amounts from the NCEP Eta (now known as the North American Mesoscale model) and Aviation (AVN; now known as the Global Forecast System) models run over a 2-...

William A. Gallus Jr.; Michael E. Baldwin; Kimberly L. Elmore

2007-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Experiments in probability of Precipitation Amount Forecasting Using Model Output Statistics  

Science Conference Proceedings (OSTI)

Modifications to current model output statistics procedures for quantitative precipitation forecasting were explored. Probability of precipitation amount equations were developed for warm and cool seasons in a region in the eastern United States. ...

Raymond W. Arritt; William M. Frank

1985-11-01T23:59:59.000Z

362

A High-Resolution Analysis of Cloud Amount and Type over Complex Topography  

Science Conference Proceedings (OSTI)

This paper reports on the first application of a multispectral textural Bayesian cloud classification algorithm (“SRTex”) to the general problem of the determination of high–spatial resolution cloud-amount and cloud-type climatological ...

Michael J. Uddstrom; John A. McGregor; Warren R. Gray; John W. Kidson

2001-01-01T23:59:59.000Z

363

Reduce Operating Costs with an EnergySmart School Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operating Costs with an Operating Costs with an EnergySmart School Project Energy costs are a school district's second highest expenditure after personnel. Public schools currently spend more than $8 billion per year for energy. School ener- gy expenditures rose, on average, 20 percent per year between 2000 and 2002-and the costs continue to rise. Natural gas prices alone increased 14 percent annually between 2003 and 2006. Improving a school's energy efficiency doesn't have to cost millions. In fact, schools can cut their energy expenses by 5 to 20 percent simply by efficiently managing and operating physical plants. This holds true regardless of the age of a school building. A smart O&M program can improve an existing school's energy performance An O&M program can be a simple initiative or a

364

Energy Cost Calculator for Compact Fluorescent Lamps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compact Fluorescent Lamps Compact Fluorescent Lamps Energy Cost Calculator for Compact Fluorescent Lamps October 8, 2013 - 2:18pm Addthis This tool calculates the payback period for your calc retrofit project. Modify the default values to suit your project requirements. Existing incandescent lamp wattage Watts Incandescent lamp cost dollars Incandescent lamp life 1000 hours calc wattage Watts calc cost dollars calc life (6000 hours for moderate use, 10000 hours for high use) 8000 hours Number of lamps in retrofit project Hours operating per week hours Average cost of electricity 0.06 $/kWh Relamper labor costs $/hr Time taken to retrofit all lamps in this project min Time taken to relamp one lamp min Type of Relamping Practiced: Group Relamping: Calculate Simple Payback Period months

365

Special Feature: Reducing Energy Costs with Better Batteries  

NLE Websites -- All DOE Office Websites (Extended Search)

Reducing Energy Costs with Better Batteries Reducing Energy Costs with Better Batteries Special Feature: Reducing Energy Costs with Better Batteries September 9, 2013 Contact: Linda Vu, +1 510 495 2402, lvu@lbl.gov Electricvehicles8331019248.jpg Electric vehicles lined up in Cascade Locks. Credit: Oregon Department of Transportation A better battery-one that is cheap and safe, but packs a lot of power-could lead to an electric vehicle that performs better than today's gasoline-powered cars, and costs about the same or less to consumers. Such a vehicle would reduce the United States' reliance on foreign oil and lower energy costs for the average American, so one of the Department of Energy's (DOE's) goals is to fund research that will revolutionize the performance of next-generation batteries. In honor of DOE's supercomputing month, we are highlighting some of the

366

Evaporative Roof Cooling - A Simple Solution to Cut Cooling Costs  

E-Print Network (OSTI)

Since the "Energy Crisis" Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retrofit installations show direct energy savings and paybacks from twelve to thirty months. The main operating cost of an Evaporative Roof Cooling System is water. One thousand gallons of water, completely evaporated, will produce over 700 tons of cooling capability. Water usage seldom averages over 100 gallons per 1000 ft^2 of roof area per day or 10 oz. of water per 100 ft^2 every six minutes. Roof Cooling Systems, when planned in new construction, return 1-1/2 times the investment the first year in equipment savings and operating costs. Roof sprays are a low cost cooling solution for warehouses, distribution centers and light manufacturing or assembly areas with light internal loads. See text "Flywheel Cooling."

Abernethy, D.

1985-01-01T23:59:59.000Z

367

Obtaining accurate amounts of mercury from mercury compounds via electrolytic methods  

DOE Patents (OSTI)

A process is described for obtaining pre-determined, accurate rate amounts of mercury. In one embodiment, predetermined, precise amounts of Hg are separated from HgO and plated onto a cathode wire. The method for doing this involves dissolving a precise amount of HgO which corresponds to a pre-determined amount of Hg desired in an electrolyte solution comprised of glacial acetic acid and H[sub 2]O. The mercuric ions are then electrolytically reduced and plated onto a cathode producing the required pre-determined quantity of Hg. In another embodiment, pre-determined, precise amounts of Hg are obtained from Hg[sub 2]Cl[sub 2]. The method for doing this involves dissolving a precise amount of Hg[sub 2]Cl[sub 2] in an electrolyte solution comprised of concentrated HCl and H[sub 2]O. The mercurous ions in solution are then electrolytically reduced and plated onto a cathode wire producing the required, pre-determined quantity of Hg. 1 fig.

Grossman, M.W.; George, W.A.

1987-07-07T23:59:59.000Z

368

Obtaining accurate amounts of mercury from mercury compounds via electrolytic methods  

DOE Patents (OSTI)

A process for obtaining pre-determined, accurate rate amounts of mercury. In one embodiment, predetermined, precise amounts of Hg are separated from HgO and plated onto a cathode wire. The method for doing this involves dissolving a precise amount of HgO which corresponds to a pre-determined amount of Hg desired in an electrolyte solution comprised of glacial acetic acid and H.sub.2 O. The mercuric ions are then electrolytically reduced and plated onto a cathode producing the required pre-determined quantity of Hg. In another embodiment, pre-determined, precise amounts of Hg are obtained from Hg.sub.2 Cl.sub.2. The method for doing this involves dissolving a precise amount of Hg.sub.2 Cl.sub.2 in an electrolyte solution comprised of concentrated HCl and H.sub.2 O. The mercurous ions in solution are then electrolytically reduced and plated onto a cathode wire producing the required, pre-determined quantity of Hg.

Grossman, Mark W. (Belmont, MA); George, William A. (Rockport, MA)

1987-01-01T23:59:59.000Z

369

Comparison of indirect cost multipliers for vehicle manufacturing  

SciTech Connect

In the process of manufacturing and selling vehicles, a manufacturer incurs certain costs. Among these costs are those incurred directly as a part of manufacturing operations and those incurred indirectly in the processes of manufacturing and selling. The indirect costs may be production-related, such as R and D and engineering; business-related, such as corporate staff salaries and pensions; or retail-sales-related, such as dealer support and marketing. These indirect costs are recovered by allocating them to each vehicle. Under a stable, high-volume production process, the allocation of these indirect costs can be approximated as multipliers (or factors) applied to the direct cost of manufacturing. A manufacturer usually allocates indirect costs to finished vehicles according to a corporation-specific pricing strategy. Because the volumes of sales and production vary widely by model within a corporation, the internal corporate percent allocation of various accounting categories (such as profit or corporate overheat) can vary widely among individual models. Approaches also vary across corporations. For these purposes, an average value is constructed, by means of a generic representative method, for vehicle models produced at high volume. To accomplish this, staff at Argonne National Laboratory's (ANL's) Center for Transportation Research analyzed the conventional vehicle cost structure and developed indirect cost multipliers for passenger vehicles. This memorandum summarizes the results of an effort to compare and put on a common basis the cost multipliers used in ANL's electric and hybrid electric vehicle cost estimation procedures with those resulting from two other methodologies. One of the two compared methodologies is derived from a 1996 presentation by Dr. Chris Borroni-Bird of Chrysler Corporation, the other is by Energy and Environmental Analysis, Inc. (EEA), as described in a 1995 report by the Office of Technology Assessment (OTA), Congress of the United States. The cost multipliers are used for scaling the component costs to retail prices.

Vyas, A.; Santini, D.; Cuenca, R.

2000-05-16T23:59:59.000Z

370

Pennsylvania life cycle costing manual  

SciTech Connect

Until the 1970s, it was commonplace for institutions and governments to purchase equipment based on lowest initial (first) costs. Recurring costs such as operational, maintenance, and energy costs often were not considered in the purchase decision. If an agency wanted to buy something, it published specifications and requested bids from several manufacturers. Often, the lowest bidder who met the specifications won the job, with no consideration given to the economic life of the equipment or yearly recurring costs such as energy and maintenance costs. The practice of purchasing based on lowest initial costs probably did not make good economic sense prior to 1970, and it certainly does not make good sense now. The wise person will consider all costs and benefits associated with a purchase, both initial and post-purchase, in order to make procurement decisions that are valid for the life of the equipment. This describes a method of financial analysis that considers all pertinent costs: life cycle costing (LCC).

1996-02-01T23:59:59.000Z

371

Table 15. Average Electricity Prices, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

Average Electricity Prices, Projected vs. Actual Average Electricity Prices, Projected vs. Actual (nominal cents per kilowatt-hour) 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 AEO 1982 6.38 6.96 7.63 8.23 8.83 9.49 AEO 1983 6.85 7.28 7.74 8.22 8.68 9.18 13.12 AEO 1984 6.67 7.05 7.48 7.89 8.25 8.65 11.53 AEO 1985 6.62 6.94 7.32 7.63 7.89 8.15 8.46 8.85 9.20 9.61 10.04 AEO 1986 6.67 6.88 7.05 7.18 7.35 7.52 7.65 7.87 8.31 8.83 9.41 10.01 10.61 11.33 12.02 AEO 1987 6.63 6.65 6.92 7.12 7.38 7.62 7.94 8.36 8.86 11.99 AEO 1989* 6.50 6.75 7.14 7.48 7.82 8.11 8.50 8.91 9.39 9.91 10.49 11.05 11.61 AEO 1990 6.49 6.72 8.40 10.99 14.5 AEO 1991 6.94 7.31 7.59 7.82 8.18 8.38 8.54 8.73 8.99 9.38 9.83 10.29 10.83 11.36 11.94 12.58 13.21 13.88 14.58 15.21 AEO 1992 6.97 7.16 7.32 7.56 7.78 8.04 8.29 8.57 8.93 9.38 9.82 10.26 10.73 11.25 11.83 12.37 12.96 13.58 14.23 AEO 1993

372

LIFE Cost of Electricity, Capital and Operating Costs  

Science Conference Proceedings (OSTI)

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

Anklam, T

2011-04-14T23:59:59.000Z

373

Cost-sensitive classifier evaluation using cost curves  

Science Conference Proceedings (OSTI)

The evaluation of classifier performance in a cost-sensitive setting is straightforward if the operating conditions (misclassification costs and class distributions) are fixed and known. When this is not the case, evaluation requires a method of visualizing ...

Robert C. Holte; Chris Drummond

2008-05-01T23:59:59.000Z

374

What types and amounts of energy are produced in each state? - FAQ ...  

U.S. Energy Information Administration (EIA)

How much does it cost to build different types of power plants in the United States? How much energy does a person use in a year? How much energy is consumed in ...

375

Design and operation of power systems with large amounts of wind power  

E-Print Network (OSTI)

Production”has been formed in IEA Wind. The R&D task will collect and share information on the experience gained and the studies made on power system impacts of wind power, and review methodologies, tools and data used. This paper outlines the power system impacts of wind power, the national studies published and ongoing and describes the goals of the international collaboration. There are dozens of studies made and ongoing related to cost of wind integration, however, the results are not easy to compare. An indepth review of the studies is needed to draw conclusions on the range of integration costs for wind power. Stateofthe art review process will seek for reasons behind the wide range of results for costs of wind integration –definitions for wind penetration, reserves and costs; different power system and load characteristics and operational rules; underlying assumptions on variability of wind etc. 1

Hannele Holttinen; Peter Meibom; Cornel Ensslin; Lutz Hofmann; John Mccann; Jan Pierik; John Olav T

2009-01-01T23:59:59.000Z

376

Determining Benefits and Costs of Improved Water Heater Efficiencies  

NLE Websites -- All DOE Office Websites (Extended Search)

Determining Benefits and Costs of Improved Water Heater Efficiencies Determining Benefits and Costs of Improved Water Heater Efficiencies Title Determining Benefits and Costs of Improved Water Heater Efficiencies Publication Type Report LBNL Report Number LBNL-45618 Year of Publication 2000 Authors Lekov, Alexander B., James D. Lutz, Xiaomin Liu, Camilla Dunham Whitehead, and James E. McMahon Document Number LBNL-45618 Date Published May 4 Abstract Economic impacts on individual consumers from possible revisions to U.S. residential water heater energy-efficiency standards are examined using a life-cycle cost (LCC) analysis. LCC is the consumer's cost of purchasing and installing a water heater and operating it over its lifetime. This approach makes it possible to evaluate the economic impacts on individual consumers from the revised standards. The methodology allows an examination of groups of the population which benefit or lose from suggested efficiency standards. The results show that the economic benefits to consumers are significant. At the efficiency level examined in this paper, 35% of households with electric water heaters experience LCC savings, with an average savings of $106, while 4% show LCC losses, with an average loss of $40 compared to a pre-standard LCC average of $2,565. The remainder of the population (61%) are largely unaffected.

377

Processing Cost Analysis for Biomass Feedstocks  

DOE Green Energy (OSTI)

The receiving, handling, storing, and processing of woody biomass feedstocks is an overlooked component of biopower systems. The purpose of this study was twofold: (1) to identify and characterize all the receiving, handling, storing, and processing steps required to make woody biomass feedstocks suitable for use in direct combustion and gasification applications, including small modular biopower (SMB) systems, and (2) to estimate the capital and operating costs at each step. Since biopower applications can be varied, a number of conversion systems and feedstocks required evaluation. In addition to limiting this study to woody biomass feedstocks, the boundaries of this study were from the power plant gate to the feedstock entry point into the conversion device. Although some power plants are sited at a source of wood waste fuel, it was assumed for this study that all wood waste would be brought to the power plant site. This study was also confined to the following three feedstocks (1) forest residues, (2) industrial mill residues, and (3) urban wood residues. Additionally, the study was confined to grate, suspension, and fluidized bed direct combustion systems; gasification systems; and SMB conversion systems. Since scale can play an important role in types of equipment, operational requirements, and capital and operational costs, this study examined these factors for the following direct combustion and gasification system size ranges: 50, 20, 5, and 1 MWe. The scope of the study also included: Specific operational issues associated with specific feedstocks (e.g., bark and problems with bridging); Opportunities for reducing handling, storage, and processing costs; How environmental restrictions can affect handling and processing costs (e.g., noise, commingling of treated wood or non-wood materials, emissions, and runoff); and Feedstock quality issues and/or requirements (e.g., moisture, particle size, presence of non-wood materials). The study found that over the years the industry has shown a good deal of ingenuity and, as a result, has developed several cost effective methods of processing and handling wood. SMB systems usually cannot afford to perform much onsite processing and therefore usually purchase fuels processed to specification. Owners of larger systems try to minimize onsite processing to minimize processing costs. Whole truck dumpers are expensive, but allow for faster and easier unloading, which reduces labor costs and charges by the haulers. Storage costs are a major factor in overall costs, thus the amount of fuel reserve is an important consideration. Silos and bins are relatively expensive compared to open piles used for larger facilities, but may be required depending on space available, wood characteristics, and amount of wood to be stored. For larger systems, a front-end loader has a lot of flexibility in use and is an essential piece of equipment for moving material. Few opportunities appear to exist for improving the cost effectiveness of these systems.

Badger, P.C.

2002-11-20T23:59:59.000Z

378

Plate with a hole obeys the averaged null energy condition  

SciTech Connect

The negative energy density of Casimir systems appears to violate general relativity energy conditions. However, one cannot test the averaged null energy condition (ANEC) using standard calculations for perfectly reflecting plates, because the null geodesic would have to pass through the plates, where the calculation breaks down. To avoid this problem, we compute the contribution to ANEC for a geodesic that passes through a hole in a single plate. We consider both Dirichlet and Neumann boundary conditions in two and three space dimensions. We use a Babinet's principle argument to reduce the problem to a complementary finite disk correction to the perfect mirror result, which we then compute using scattering theory in elliptical and spheroidal coordinates. In the Dirichlet case, we find that the positive correction due to the hole overwhelms the negative contribution of the infinite plate. In the Neumann case, where the infinite plate gives a positive contribution, the hole contribution is smaller in magnitude, so again ANEC is obeyed. These results can be extended to the case of two plates in the limits of large and small hole radii. This system thus provides another example of a situation where ANEC turns out to be obeyed when one might expect it to be violated.

Graham, Noah; Olum, Ken D. [Department of Physics, Middlebury College, Middlebury, Vermont 05753 (United States); Institute of Cosmology, Department of Physics and Astronomy, Tufts University, Medford, Massachusetts 02155 (United States)

2005-07-15T23:59:59.000Z

379

Table 19. Average Price of U.S. Coal Imports  

U.S. Energy Information Administration (EIA) Indexed Site

Price of U.S. Coal Imports Price of U.S. Coal Imports (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Table 19. Average Price of U.S. Coal Imports (dollars per short ton) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2013 Year to Date Continent and Country of Origin April - June 2013 January - March 2013 April - June 2012 2013 2012 Percent Change North America Total 147.86 138.39 191.01 144.86 197.96 -26.8 Canada 147.86 138.39 191.00 144.86 197.95 -26.8 Mexico - - 286.23 - 286.23 - South America Total 75.29 80.74 86.52 77.20 87.17 -11.4 Argentina - - 504.70 - 504.70 - Colombia 74.87 80.74 83.03 76.96 85.25 -9.7 Peru 87.09 - - 87.09 - - Venezuela 91.81 - 122.01 91.81 112.61 -18.5 Europe Total - 136.50 137.33 136.50 146.31 -6.7

380

Climate: monthly and annual average atmospheric pressure GIS data at  

Open Energy Info (EERE)

atmospheric pressure GIS data at atmospheric pressure GIS data at one-degree resolution of the World from NASA/SSE Dataset Summary Description (Abstract):Atmospheric Pressure (kPa)NASA Surface meteorology and Solar Energy (SSE) Release 6.0 Data Set (Nov 2007)22-year Monthly & Annual Average (July 1983 - June 2005)Parameter: Atmospheric Pressure (kPa)Internet: http://eosweb.larc.nasa.gov/sse/Note 1: SSE Methodology & Accuracy sections onlineNote 2: Lat/Lon values indicate the lower left corner of a 1x1 degree region. Negative values are south and west; positive values are north and east. Boundaries of the -90/-180 region are -90 to -89 (south) and -180 to -179 (west). The last region, 89/180, is bounded by 89 to 90 (north) and 179 to 180 (east). The mid-point of the region is +0.5 added to the the Lat/Lon value. These data are

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Long-term average performance benefits of parabolic trough improvements  

DOE Green Energy (OSTI)

Improved parabolic trough concentrating collectors will result from better design, improved fabrication techniques, and the development and utilization of improved materials. The difficulty of achieving these improvements varies as does their potential for increasing parabolic trough performance. The purpose of this analysis is to quantify the relative merit of various technology advancements in improving the long-term average performance of parabolic trough concentrating collectors. The performance benefits of improvements are determined as a function of operating temperature for north-south, east-west, and polar mounted parabolic troughs. The results are presented graphically to allow a quick determination of the performance merits of particular improvements. Substantial annual energy gains are shown to be attainable. Of the improvements evaluated, the development of stable back-silvered glass reflective surfaces offers the largest performance gain for operating temperatures below 150/sup 0/C. Above 150/sup 0/C, the development of trough receivers that can maintain a vacuum is the most significant potential improvement. The reduction of concentrator slope errors also has a substantial performance benefit at high operating temperatures.

Gee, R.; Gaul, H.W.; Kearney, D.; Rabl, A.

1980-03-01T23:59:59.000Z

382

Cost Sensitive Conditional Planning  

E-Print Network (OSTI)

While POMDPs provide a general platform for conditional planning under a wide range of quality metrics they have limited scalability. On the other hand, uniform probability conditional planners scale very well, but many lack the ability to optimize plan quality metrics. We present an innovation to planning graph based heuristics that helps uniform probability conditional planners both scale and generate high quality plans when using actions with non uniform costs. We make empirical comparisons with two state of the art planners to show the benefit of our techniques.

Daniel Bryce; Subbarao Kambhampati

2005-01-01T23:59:59.000Z

383

Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009  

Gasoline and Diesel Fuel Update (EIA)

Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009 Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009 Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009 Released: September 28, 2010 Next Release: Discontinued Excel Spreadsheet Model - 1994-2009 XLS (1,178 KB) Overview Oil and gas well equipment and operating costs, including coal bed methane costs, stopped their upward trend from the 1990s and fell sharply in 2009. The extremely high oil and gas prices during the first half of 2008 followed by an unprecedented drop to very low prices by the end of the year had a major impact on equipment demand. Operating costs tumbled also because fuel costs were reduced and well servicing rates fell in most areas. The exceptions were in California where electric rates continued to increase, causing a one (1) percent increase in annual operating costs for leases producing from 12,000 feet. Operating cost for coal bed methane wells in the Appalachian and Powder River areas increased because electric rates continued to climb. Due to the timing of the data collection, the cost reported here could be higher than the actual annual average for 2008. However, some production costs (labor and equipment) are not as volatile as drilling, pipe, and other well completion costs, so the effect of the oil and gas prices on collected data may be lessened. Annual average electric rates and natural gas prices are used, which also helps to dampen cost variances.

384

LOW COST HEAT PUMP WATER HEATER (HPWH)  

Science Conference Proceedings (OSTI)

Water heating accounts for the second largest portion of residential building energy consumption, after space conditioning. Existing HPWH products are a technical success, with demonstrated energy savings of 50% or more compared with standard electric resistance water heaters. However, current HPWHs available on the market cost an average of $1000 or more, which is too expensive for significant market penetration. What is needed is a method to reduce the first cost of HPWHs, so that the payback period will be reduced from 8 years to a period short enough for the market to accept this technology. A second problem with most existing HPWH products is the reliability issue associated with the pump and water loop needed to circulate cool water from the storage tank to the HPWH condenser. Existing integral HPWHs have the condenser wrapped around the water tank and thus avoid the pump and circulation issues but require a relatively complex and expensive manufacturing process. A more straightforward potentially less costly approach to the integral, single package HPWH design is to insert the condenser directly into the storage tank, or immersed direct heat exchanger (IDX). Initial development of an IDX HPWH met technical performance goals, achieving measured efficiencies or energy factors (EF) in excess of 1.79. In comparison conventional electric water heaters (EWH) have EFs of about 0.9. However, the initial approach required a 2.5" hole on top of the tank for insertion of the condenser - much larger than the standard openings typically provided. Interactions with water heater manufacturers indicated that the non standard hole size would likely lead to increased manufacturing costs (at least initially) and largely eliminate any cost advantage of the IDX approach. Recently we have been evaluating an approach to allow use of a standard tank hole size for insertion of the IDX condenser. Laboratory tests of a prototype have yielded an EF of 2.02.

Mei, Vince C [ORNL; Baxter, Van D [ORNL

2006-01-01T23:59:59.000Z

385

Cost effective multimedia courseware development  

Science Conference Proceedings (OSTI)

Multimedia technology offers considerable potential for education though the costs of production of courseware are prohibitive especially in a rapidly changing discipline such as computer science. This paper proposes a cost-effective technique which ...

C. J. Pilgrim; Y. K. Leung; D. D. Grant

1997-06-01T23:59:59.000Z

386

Overview and Low Cost Processing  

Science Conference Proceedings (OSTI)

Mar 4, 2013 ... The major reason that there is not more widespread use of titanium and its alloys is the high cost. Developments in reducing the cost of titanium ...

387

Cost and Impacts of Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

and Policies RESULTS 2010-2025 and long-run impacts 2010-2025 GovernmentIndustry Costs Hydrogen production, infrastructure & cost HyTrans merges the early transition...

388

User cost in oil production  

E-Print Network (OSTI)

The assumption of an initial fixed mineral stock is superfluous and wrong. User cost (resource rent) in mineral production is the present value of expected increases in development cost. It can be measured as the difference ...

Adelman, Morris Albert

1990-01-01T23:59:59.000Z

389

Cost-sensitive classifier evaluation  

Science Conference Proceedings (OSTI)

Evaluating classifier performance in a cost-sensitive setting is straightforward if the operating conditions (misclassification costs and class distributions) are fixed and known. When this is not the case, evaluation requires a method of visualizing ...

Robert C. Holte; Chris Drummond

2005-08-01T23:59:59.000Z

390

Wind Integration Cost and Cost-Causation: Preprint  

DOE Green Energy (OSTI)

The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

2013-10-01T23:59:59.000Z

391

3800 Green Series Cost Elements  

Energy.gov (U.S. Department of Energy (DOE))

Stoller - Legacy ManagementSustainable Acquisition (formerly EPP) Program 3800 Series Cost Elements01/30/2012 (Rev. 4)

392

Empirical Methods of Cost Estimation  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

393

Bifacial Efficiency at Monofacial Cost  

solar cells; photovoltaics; PV; bifacial efficiency; Monofacial Cost, Bifacial Cells; bifacial Modules; industry growth forum; gamma solar Created ...

394

2012 Brief: Average 2012 crude oil prices remain near 2011 levels ...  

U.S. Energy Information Administration (EIA)

Brent crude oil averaged $111.67 per barrel, slightly above the 2011 average of $111.26. West Texas Intermediate oil averaged $94.05 per barrel in 2012, ...

395

Active hurricane season expected to shut-in higher amount of oil and natural gas production  

U.S. Energy Information Administration (EIA) Indexed Site

Active hurricane season expected to shut-in higher amount of Active hurricane season expected to shut-in higher amount of oil and natural gas production An above-normal 2013 hurricane season is expected to cause a median production loss of about 19 million barrels of U.S. crude oil and 46 billion cubic feet of natural gas production in the Gulf of Mexico, according to the new forecast from the U.S. Energy Information Administration. That's about one-third more than the amount of oil and gas production knocked offline during last year's hurricane season. Government weather forecasts predict 13 to 20 named storms will form between June and the end of November, with 7 to 11 of those turning into hurricanes. Production outages in previous hurricane seasons were as high as 107 million barrels of crude oil

396

X-ray emission from the plasma is used as a proxy for the amount  

NLE Websites -- All DOE Office Websites (Extended Search)

X-ray emission from the plasma is used as a proxy for the amount X-ray emission from the plasma is used as a proxy for the amount of driven current. The solid line indicates the amount of x-ray emission predicted by a computer simulation if edge losses are not included, while the dashed line represents the computer simulation including edge losses. The colored points are experimental data from Alcator C-Mod. Contact: Gregory Wallace MIT Plasma Science and Fusion Center 175 Albany St. Cambridge, MA 02139 wallaceg@mit.edu Post deadline invited talk: Lower hybrid current drive at high density in the multi-pass regime A post-deadline invited talk explains how experiments on the Alcator C-Mod tokamak at the MIT Plasma Science and Fusion Center are making important steps towards learning how to keep future fusion power plants running 24/7.

397

Levelized cost of coating (LCOC) for selective absorber materials.  

SciTech Connect

A new metric has been developed to evaluate and compare selective absorber coatings for concentrating solar power applications. Previous metrics have typically considered the performance of the selective coating (i.e., solar absorptance and thermal emittance), but cost and durability were not considered. This report describes the development of the levelized cost of coating (LCOC), which is similar to the levelized cost of energy (LCOE) commonly used to evaluate alternative energy technologies. The LCOC is defined as the ratio of the annualized cost of the coating (and associated costs such as labor and number of heliostats required) to the average annual thermal energy produced by the receiver. The baseline LCOC using Pyromark 2500 paint was found to be %240.055/MWht, and the distribution of LCOC values relative to this baseline were determined in a probabilistic analysis to range from -%241.6/MWht to %247.3/MWht, accounting for the cost of additional (or fewer) heliostats required to yield the same baseline average annual thermal energy produced by the receiver. A stepwise multiple rank regression analysis showed that the initial solar absorptance was the most significant parameter impacting the LCOC, followed by thermal emittance, degradation rate, reapplication interval, and downtime during reapplication.

Ho, Clifford Kuofei; Pacheco, James Edward

2013-09-01T23:59:59.000Z

398

COST SHARING ON SPONSORED PROJECTS  

E-Print Network (OSTI)

COST SHARING ON SPONSORED PROJECTS 1 California Institute of Technology Issuing Authority: Office is that portion of the total cost of an externally funded project that is not funded by the sponsor. Depending as a demonstration of its commitment to the project. When voluntary cost sharing is included in the proposal budget

Tai, Yu-Chong

399

A TEST OF THE PRECIPITATION AMOUNT AND INTENSITY MEASUREMENTS WITH THE OTT PLUVIO  

E-Print Network (OSTI)

A TEST OF THE PRECIPITATION AMOUNT AND INTENSITY MEASUREMENTS WITH THE OTT PLUVIO Wiel M.F. Wauben precipitation sensor of Ott has been tested at KNMI in order to find out whether it is a suitable candidate for replacing the current operational KNMI precipitation gauge. Tests performed at the calibration facilities

Wauben, Wiel

400

Measurement of Low Amounts of Precipitable Water Vapor Using Ground-Based Millimeterwave Radiometry  

Science Conference Proceedings (OSTI)

Extremely dry conditions characterized by amounts of precipitable water vapor (PWV) as low as 1–2 mm commonly occur in high-latitude regions during the winter months. While such dry atmospheres carry only a few percent of the latent heat energy ...

Paul E. Racette; Ed R. Westwater; Yong Han; Albin J. Gasiewski; Marian Klein; Domenico Cimini; David C. Jones; Will Manning; Edward J. Kim; James R. Wang; Vladimir Leuski; Peter Kiedron

2005-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The comparison of three common methods for reducing the amount of dissipation in a feeder  

Science Conference Proceedings (OSTI)

Every year, a high amount of the best and most valuable kind of energy, i.e. electrical energy, is dissipated before received by consumers. Although, it is not possible to remove this fact thoroughly; but research on this area can be a start point for ... Keywords: capacitor placement (capaciting), feeder, load balance, power factor, power flow, profile

Mohsen Hayati; Behnam Karami

2006-07-01T23:59:59.000Z

402

Wormholes, Gamma Ray Bursts and the Amount of Negative Mass in the Universe  

E-Print Network (OSTI)

In this essay, we assume that negative mass objects can exist in the extragalactic space and analyze the consequences of their microlensing on light from distant Active Galactic Nuclei. We find that such events have very similar features to some observed Gamma Ray Bursts and use recent satellite data to set an upper bound to the amount of negative mass in the universe.

Diego F. Torres; Gustavo E. Romero; Luis A. Anchordoqui

1998-05-19T23:59:59.000Z

403

Global 3D-Nephanalysis of Total Cloud Amount: Climatology for 1979  

Science Conference Proceedings (OSTI)

A one-year global total cloud amount climatology has been compiled from the U.S. Air Force's three-dimensional nephanalysis cloud archive. The derived cloud distributions are shown to be reliable and in good agreement with known features of the ...

N. A. Hughes; A. Henderson-Sellers

1985-07-01T23:59:59.000Z

404

17.2 - Cost Participation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17.2 (June 2004) 17.2 (June 2004) 1 Cost Participation [Reference: FAR 35.003(b), DEAR 917.70] Overview This section discusses DOE treatment of cost participation by organizations performing research, development, and demonstration projects under DOE prime contracts. This section does not cover efforts and projects performed for DOE by other Federal agencies. Background Cost participation is a generic term denoting any situation where the Government does not fully reimburse the contractor for all allowable costs necessary to accomplish the project or effort under the contract. The term includes, but is not limited to: * Cost Sharing * Cost Matching * Cost Limitation, which may be direct or indirect * Participation in-kind

405

Realistic costs of carbon capture  

Science Conference Proceedings (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

406

Busting the Myth That Green Costs More Green  

E-Print Network (OSTI)

Buildings are one of the largest consumers of resources and energy in this country, and according to the AIA (American Institute of Architects) are responsible for almost half of all carbon emissions in the United States. Since Americans spend nearly 90 percent of their lives indoors, buildings are clearly important to our way of life. The most common misconception about green building is that these approaches cost more to implement than traditional strategies and techniques of design and construction. Any decision made in the early stages of programming and design will have economic impact on the overall building cost. How many floors will our building have? Will we use marble in the lobby? Can we use fancy fixtures in the bathrooms? But according to a Davis Langdon study, there was “…no significant difference in the construction costs for LEED®-seeking versus non- LEED® buildings…” In addition to this widely referenced report, other independent studies by the State of California and the GSA indicate that cost premiums are minimal. More importantly, first cost is only a small part of the total cost of building ownership. Cost-of-ownership studies agree that first cost only accounts for around 10 percent of all costs a building owner will spend over the life of the building. The other 90 percent comes in the form of operation and maintenance – two areas in which designing for LEED® certification can save enormously. Any additional costs for building green are recouped in one to two years on average, with exponential cost savings thereafter that leave traditional construction far behind.

Qualk, J. D.; McCown, P.

2008-10-01T23:59:59.000Z

407

Maryland Small Business Helping Lower Solar Costs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Small Business Helping Lower Solar Costs Small Business Helping Lower Solar Costs Maryland Small Business Helping Lower Solar Costs January 12, 2010 - 9:14am Addthis Joshua DeLung One potential problem with going solar across America is that the up-front costs of installing solar panels are often too high for the average consumer. Though panels can produce mounds of energy savings over a long period of time, the expense of installation is still too high for many. However, stimulus funding awarded to a small, Maryland-based business with six employees - AccuStrata Inc. - by the U.S. Department of Energy under the Recovery Act is helping the company develop technology to eliminate such barriers. AccuStrata was awarded its third Small Business Innovation Research grant of $150,000 in December. These grants will help the company increase the

408

Maryland Small Business Helping Lower Solar Costs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maryland Small Business Helping Lower Solar Costs Maryland Small Business Helping Lower Solar Costs Maryland Small Business Helping Lower Solar Costs January 12, 2010 - 9:14am Addthis Joshua DeLung One potential problem with going solar across America is that the up-front costs of installing solar panels are often too high for the average consumer. Though panels can produce mounds of energy savings over a long period of time, the expense of installation is still too high for many. However, stimulus funding awarded to a small, Maryland-based business with six employees - AccuStrata Inc. - by the U.S. Department of Energy under the Recovery Act is helping the company develop technology to eliminate such barriers. AccuStrata was awarded its third Small Business Innovation Research grant of $150,000 in December. These grants will help the company increase the

409

GUIDE TO NUCLEAR POWER COST EVALUATION. VOLUME 4. FUEL CYCLE COSTS  

SciTech Connect

Information on fuel cycle cost is presented. Topics covered include: nuclear fuel, fuel management, fuel cost, fissionable material cost, use charge, conversion and fabrication costs, processing cost, and shipping cost. (M.C.G.)

1962-03-15T23:59:59.000Z

410

Studies on activated carbon capacitor materials loaded with different amounts of ruthenium oxide  

E-Print Network (OSTI)

speci®c capacitance [4]. However, the cost of ruthenium and its compounds limits its wide spread usage in electric/hybrid vehicles and consumer electronics. Substitutes for Ru oxides do not show compar- able 100 F/g, much lower than 720 F/g reported for amorphous RuO2. Wilde et al. [9] synthesized SrRuO3

Popov, Branko N.

411

Electric Demand Cost Versus Labor Cost: A Case Study  

E-Print Network (OSTI)

Electric Utility companies charge industrial clients for two things: demand and usage. Depending on type of business and hours operation, demand cost could be very high. Most of the operations scheduling in a plant is achieved considering labor cost. For small plants, it is quite possible that a decrease in labor could result in an increase in electric demand and cost or vice versa. In this paper two cases are presented which highlight the dependence of one on other.

Agrawal, S.; Jensen, R.

1998-04-01T23:59:59.000Z

412

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2008-03-01T23:59:59.000Z

413

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

2007-04-01T23:59:59.000Z

414

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2009-12-01T23:59:59.000Z

415

Report on Audit of Architect and Engineering Costs at the Idaho National Engineering Laboratory  

SciTech Connect

In September 1990 the Office of Inspector General (OIG) issued the Department-wide Audit of Architect and Engineering Design Costs (DOE/IG-0289) which concluded that the Department`s A/E costs averaged more than twice that of private industry. The primary cause of the higher costs was the lack of Departmental A/E cost standards that would provide measurement criteria for controlling costs. Consistent with our prior Department-wide audit, the purpose of this audit was to determine whether A/E services performed at the Laboratory were economical. Specifically, we determined whether the costs for A/E services at the Laboratory were comparable to the cost standards for A/E services in industry and the State; and, whether A/E costs were reasonable.

1996-03-22T23:59:59.000Z

416

Replacement energy, capacity, and reliability costs for permanent nuclear reactor shutdowns  

SciTech Connect

Average replacement power costs are estimated for potential permanent shutdowns of nuclear electricity-generating units. Replacement power costs are considered to include replacement energy, capacity, and reliability cost components. These estimates were developed to assist the US Nuclear Regulatory Commission in evaluating regulatory issues that potentially affect changes in serious reactor accident frequencies. Cost estimates were derived from long-term production-cost and capacity expansion simulations of pooled utility-system operations. Factors that affect replacement power cost, such as load growth, replacement sources of generation, and capital costs for replacement capacity, were treated in the analysis. Costs are presented for a representative reactor and for selected subcategories of reactors, based on estimates for 112 individual reactors.

VanKuiken, J.C., Buehring, W.A.; Hamilton, S.; Kavicky, J.A.; Cavallo, J.D.; Veselka, T.D.; Willing, D.L. [Argonne National Lab., IL (United States)

1993-10-01T23:59:59.000Z

417

Today in Energy - High airline jet fuel costs prompt cost ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration ... and idling time. ... Delta stated that it anticipates cost savings of $300 million per year as a result of this ...

418

A cost analysis model for heavy equipment  

Science Conference Proceedings (OSTI)

Total cost is one of the most important factors for a heavy equipment product purchase decision. However, the different cost views and perspectives of performance expectations between the different involved stakeholders may cause customer relation problems ... Keywords: Cost responsibilities, Operating costs, Ownership costs, Post-Manufacturing Product Cost (PMPC), System life-cycle cost

Shibiao Chen; L. Ken Keys

2009-05-01T23:59:59.000Z

419

An Explanation of F&A Costs What are F&A Costs?  

E-Print Network (OSTI)

An Explanation of F&A Costs What are F&A Costs? Costs involved in conducting sponsored projects costs and F&A costs together are the actual cost of a sponsored project. Direct costs are "those costs, indirect costs cannot be specifically attributed to an individual project. For example, it is difficult

420

Fermilab | Tritium at Fermilab | Steps taken to reduce the amount of  

NLE Websites -- All DOE Office Websites (Extended Search)

Steps taken to reduce the amount of tritium Steps taken to reduce the amount of tritium Actions taken in response to the detection of low levels of tritium in surface and sewer water in November 2005 What did we detect in November 2005? In November 2005, for the first time in the then-35-year history of our environmental monitoring program at Fermilab, we detected low levels of tritium in a stream leaving the Fermilab site, and in the sanitary sewers that pump water to the Batavia Wastewater Treatment Plant. The levels detected were far lower than the federal water standards that Fermilab is required to meet, and pose no threat to human health or the environment. (Our Frequently Asked Questions page provides more general information about tritium.) How much tritium did we find? Very little. Samples of Indian Creek, taken just inside the Fermilab

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Hydrogen refueling station costs in Shanghai  

E-Print Network (OSTI)

tool to compare existing cost estimates from the literature,It compiles and organizes cost estimates obtained from aE. Hydrogen supply: cost estimate for hydrogen pathways—

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

422

Cost estimating projects for large cutter and hopper dredges  

E-Print Network (OSTI)

Estimating the cost of a dredging project is the most important part of a project's life cycle. A precise account of the costs associated with performing dredging work begins with the production estimate and ends with the cost estimate. The production estimate is based on a clear understanding of some fundamental laws governing hydraulic transport including variations of the Bernoulli Equation. Newer theories concerning friction loss in a pipeline aid in the development of the production estimate phase of the program. Practical experience aids in the transition from production estimate to cost estimate. This thesis reviews the process of creating a program that for the first time provides users not associated with the government or dredging companies a method to determine the cost of a dredging project employing a hopper dredge. The program consists of two Microsoft Excel spreadsheets and provides a means to estimate either large cutter (27" and larger) or hopper dredge projects. The program allows for a high degree of customization to account for either a particular dredge or project. In a series of comparisons, the program output had an average difference of 17.3% between the estimated price and the price awarded to the winning bidder. For the same projects the government estimate varied an average of 16.2%. Using the accuracy of the government estimate as a measure of accomplishment, the program can be considered a success.

Belesimo, Francesco John

2000-01-01T23:59:59.000Z

423

Face Amount of Life Insurance Coverage by Program by State | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Face Amount of Life Insurance Coverage by Program by State Face Amount of Life Insurance Coverage by Program by State Consumer Data Apps Challenges Resources About Blogs Let's Talk Feedback Consumer You are here Data.gov » Communities » Consumer » Data Face Amount of Life Insurance Coverage by Program by State Dataset Summary Description Face value of insurance for each administered life insurance program listed by state. Data is current as of 04/30/12. All programs are closed to new issues except for Service-Disabled Veterans' Insurance and Veterans' Mortgage Life Insurance. United States Government Life Insurance was issued to WWI military personnel and Veterans. National Service Life Insurance was established to meet the needs of WWII military personnel and Veterans. Veterans' Special Life Insurance was issued to Korean War-era Veterans. Veterans' Reopened Insurance provides coverage to certain classes of disabled Veterans from WWII and the Korean conflict who had dropped their government life insurance coverage. Service-Disabled Veterans' Insurance was established in 1951 and is available to Veterans with service-connected disabilities. Veterans' Mortgage Life Insurance was established in 1971 to provide mortgage protection life insurance to severely disabled Veterans who have received grants for the purchase of specially adapted housing.

424

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

SciTech Connect

The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates in

Mills, Evan

2009-07-16T23:59:59.000Z

425

Analysis of refiners' total barrel costs and revenues from the sale of petroleum products, 1976 to 1979  

SciTech Connect

In this report, the Economic Regulatory Administration has evaluated refiners' costs and revenues from the sale of major petroleum products from July 1976 through December 1979. This report represents a continuing effort to assess No. 2 heating oil prices and margins in that it updates prior middle distillate studies through March 1980. The analysis examines selling prices and costs associated with each major petroleum product category and a combination of petroleum products (total barrel) from a sample of nine refiners. The total barrel approach was adopted to reduce distortions caused by varying methods of allocation of costs among regulated and unregulated products by refiners. This report determines the extent to which increased costs were recovered on controlled products and whether refiners obtained greater cost recoupment on decontrolled products than would have been allowed under continued controls. The principal methods of measurement used to evaluate product pricing levels for the nine refiners surveyed were cost recoupment (Chapter III), gross margins (Chapter IV), and net margins (Chapter V). Gross margins were derived by subtracting average crude oil costs from average product selling prices for individual product categories and the total barrel. Net margins were derived by subtracting average crude oil costs as well as average marketing, manufacturing, and purchased product costs from average selling prices for individual product categories and the total barrel.

1980-11-01T23:59:59.000Z

426

Keeping the Lights on While Cutting Costs.  

Science Conference Proceedings (OSTI)

In 1992, the Bonneville Power Administration spent $361 million in capital on a system to transmit electricity. By 1998, it was spending about one-third that amount: $123 million. In 1992, BPA`s expenses for managing, operating and maintaining the transmission system ran $160 million. By 1998, BPA had cut expenses to $128 million. Maintenance costs alone were cut 28%. In 1992, management of the grid was split into six organizations. Today, there is one. About 2,900 people worked for transmission in October 1992. By February 1998, the Transmission Business Line (TBL) employed 1,855. Transmission in 1992 for the most part meant new towers, lines and substations. Today it means computers, digital communications and electronic controls.

United States. Bonneville Power Administration.

1998-08-01T23:59:59.000Z

427

,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member"  

U.S. Energy Information Administration (EIA) Indexed Site

1 Average Square Footage of Midwest Homes, by Housing Characteristics, 2009" 1 Average Square Footage of Midwest Homes, by Housing Characteristics, 2009" " Final" ,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member" "Housing Characteristics","Millions","Total2","Heated","Cooled","Total2","Heated","Cooled" "Total Midwest",25.9,2272,1898,1372,912,762,551 "Midwest Divisions and States" "East North Central",17.9,2251,1869,1281,892,741,508 "Illinois",4.8,2186,1911,1451,860,752,571 "Michigan",3.8,1954,1559,962,729,582,359 "Wisconsin",2.3,2605,2091,1258,1105,887,534

428

,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member"  

U.S. Energy Information Administration (EIA) Indexed Site

3 Average Square Footage of West Homes, by Housing Characteristics, 2009" 3 Average Square Footage of West Homes, by Housing Characteristics, 2009" " Final" ,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member" "Housing Characteristics","Millions","Total2","Heated","Cooled","Total2","Heated","Cooled" "Total West",24.8,1708,1374,800,628,506,294 "West Divisions and States" "Mountain",7.9,1928,1695,1105,723,635,415 "Mountain North",3.9,2107,1858,912,776,684,336 "Colorado",1.9,2082,1832,722,896,788,311 "Idaho, Montana, Utah, Wyoming",2,2130,1883,1093,691,610,354

429

Biodiesel Performance, Costs, and Use  

U.S. Energy Information Administration (EIA)

Biodiesel Performance, Costs, and Use. by Anthony Radich. Introduction. The idea of using vegetable oil for fuel has been around as long as the diesel engine.

430

HTGR Cost Model Users' Manual  

Science Conference Proceedings (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

431

Download Data | Transparent Cost Database  

Open Energy Info (EERE)

in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a...

432

Preemptive scheduling with position costs  

E-Print Network (OSTI)

horizon is divided into time periods. In these models, the whole production is not processed in a single period, and production and holding costs are introduced ...

433

FIRM PRODUCTIVITY AND SUNK COSTS  

E-Print Network (OSTI)

The main objective of this paper is to explore whether or not sunk costs are systematically related to productivity di¤erences at the …rm level, as suggested by models of industry dynamics (Hopenhayn, 1992).The comparisons of productivity distributions for groups of …rms with di¤erent levels of sunk costs are performed by non-parametric procedures and for a large scale …rm-level panel data set of Spanish manufacturing …rms. We …nd that sunk costs are an important source of heterogeneity across …rm productivity. The evidence we …nd is consistent with models of industry dynamics predicting lower productivity for …rms with a higher level of sunk costs.

Jose C. Fariñas; Sonia Ruano

2004-01-01T23:59:59.000Z

434

WSRC Nuclear Materials Cost Module  

National Nuclear Security Administration (NNSA)

Office (GAO) WSRC NM Cost Module Generates WSRC monthly and fiscal year to date Inventory and Manufacturing Statement for government owned accountable nuclear materials....

435

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network (OSTI)

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling Oak Ridge National been identified by carbon fiber manufacturers as a market with substantial growth potential. When manufactured with carbon fiber as opposed to traditional materials such as steel, automotive parts are able

436

Vehicle Technologies Office: Fact #615: March 22, 2010 Average Vehicle Trip  

NLE Websites -- All DOE Office Websites (Extended Search)

5: March 22, 5: March 22, 2010 Average Vehicle Trip Length to someone by E-mail Share Vehicle Technologies Office: Fact #615: March 22, 2010 Average Vehicle Trip Length on Facebook Tweet about Vehicle Technologies Office: Fact #615: March 22, 2010 Average Vehicle Trip Length on Twitter Bookmark Vehicle Technologies Office: Fact #615: March 22, 2010 Average Vehicle Trip Length on Google Bookmark Vehicle Technologies Office: Fact #615: March 22, 2010 Average Vehicle Trip Length on Delicious Rank Vehicle Technologies Office: Fact #615: March 22, 2010 Average Vehicle Trip Length on Digg Find More places to share Vehicle Technologies Office: Fact #615: March 22, 2010 Average Vehicle Trip Length on AddThis.com... Fact #615: March 22, 2010 Average Vehicle Trip Length According to the latest National Household Travel Survey, the average trip

437

Microsoft Word - How Much Does It Cost to Light Your School.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

How Much Does It Cost to Light Your School? 1 How Much Does It Cost to Light Your School? 1 Activity: How Much Does It Cost to Light Your School? (Information courtesy of the American Coal Foundation) Overview: Students compute the cost of electricity used to light their classroom and their school for various lengths of time. They then compute the amount of coal needed to produce the electricity used for one hour of light in their classroom. Objectives: Students will: * calculate the cost of providing electricity to light their classroom and school, * compute the amount of coal needed for one hour of light in their classroom, and * gain an appreciation for how much coal is needed to generate electricity. Materials: Paper and pencil Classroom and school lit by fluorescent bulbs

438

Electric power substation capital costs  

SciTech Connect

The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

Dagle, J.E.; Brown, D.R.

1997-12-01T23:59:59.000Z

439

Circofer -- Low cost approach to DRI production  

SciTech Connect

Lurgi's Circofer Process for reducing fine ores with coal in a Circulating Fluidized Bed (CFB) is a direct approach by using a widely applied and proven reactor in commercializing a state of the art technology. The technology is in response to the demand for a direct reduction process of the future by making possible: the use of low cost ore fines and inexpensive primary energy, fine coal; production of a high grade product used as feedstock by mini mills with the additional advantage of dilution of contaminants introduced by scrap; low environmental impact; and low specific investment costs due to the closed energy circuit. With the incorporation of the latest developments in CFB technology, Circofer offers excellent heat and mass transfer conditions and, consequently, improved gas and energy utilization. High gas conversions using recycle gas have a positive influence on the process economics whereby no export gas is produced. Sticking, accretion and reoxidation problems, which have plagued all previous attempts at developing direct reduction processes using fine ore and coal as a reductant, are avoided, essentially by operating with defined amounts of excess carbon and separation of the reduction and gasifying zones.

Weber, P.; Bresser, W.; Hirsch, M. (Lurgi Metallurgie GmbH, Frankfurt (Germany))

1994-09-01T23:59:59.000Z

440

Nevada Energy and Cost Savings for New Single- and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC  

Science Conference Proceedings (OSTI)

The 2012 International Energy Conservation Code (IECC) yields positive benefits for Nevada homeowners. Moving to the 2012 IECC from the 2009 IECC is cost-effective over a 30-year life cycle. On average, Nevada homeowners will save $4,736 with the 2012 IECC. Each year, the reduction to energy bills will significantly exceed increased mortgage costs. After accounting for up-front costs and additional costs financed in the mortgage, homeowners should see net positive cash flows (i.e., cumulative savings exceeding cumulative cash outlays) in 2 years for the 2012 IECC. Average annual energy savings are $360 for the 2012 IECC.

Lucas, Robert G.; Taylor, Zachary T.; Mendon, Vrushali V.; Goel, Supriya

2012-07-03T23:59:59.000Z

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Idaho Energy and Cost Savings for New Single- and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC  

SciTech Connect

The 2012 International Energy Conservation Code (IECC) yields positive benefits for Idaho homeowners. Moving to the 2012 IECC from the 2009 IECC is cost-effective over a 30-year life cycle. On average, Idaho homeowners will save $4,057 with the 2012 IECC. Each year, the reduction to energy bills will significantly exceed increased mortgage costs. After accounting for up-front costs and additional costs financed in the mortgage, homeowners should see net positive cash flows (i.e., cumulative savings exceeding cumulative cash outlays) in 1 year for the 2012 IECC. Average annual energy savings are $285 for the 2012 IECC.

Lucas, Robert G.; Taylor, Zachary T.; Mendon, Vrushali V.; Goel, Supriya

2012-07-03T23:59:59.000Z

442

Pennsylvania Energy and Cost Savings for New Single- and Multifamily Homes: 2012 IECC as Compared to the 2009 IRC  

SciTech Connect

The 2012 International Energy Conservation Code (IECC) yields positive benefits for Pennsylvania homeowners. Moving to the 2012 IECC from Chapter 11 of the 2009 International Residential Code (IRC) is cost-effective over a 30-year life cycle. On average, Pennsylvania homeowners will save $8,632 with the 2012 IECC. Each year, the reduction to energy bills will significantly exceed increased mortgage costs. After accounting for up-front costs and additional costs financed in the mortgage, homeowners should see net positive cash flows (i.e., cumulative savings exceeding cumulative cash outlays) in 1 year for the 2012 IECC. Average annual energy savings are $515 for the 2012 IECC.

Lucas, Robert G.; Taylor, Zachary T.; Mendon, Vrushali V.; Goel, Supriya

2012-07-03T23:59:59.000Z

443

Ohio Energy and Cost Savings for New Single- and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC  

Science Conference Proceedings (OSTI)

The 2012 International Energy Conservation Code (IECC) yields positive benefits for Ohio homeowners. Moving to the 2012 IECC from the 2009 IECC is cost-effective over a 30-year life cycle. On average, Ohio homeowners will save $5,151 with the 2012 IECC. Each year, the reduction to energy bills will significantly exceed increased mortgage costs. After accounting for up-front costs and additional costs financed in the mortgage, homeowners should see net positive cash flows (i.e., cumulative savings exceeding cumulative cash outlays) in 1 year for the 2012 IECC. Average annual energy savings are $330 for the 2012 IECC.

Lucas, Robert G.; Taylor, Zachary T.; Mendon, Vrushali V.; Goel, Supriya

2012-07-03T23:59:59.000Z

444

Calculating Cycling Wear and Tear Costs: Methodology and Data Requirements  

Science Conference Proceedings (OSTI)

This interim report describes development of a methodology and database that utilities can use to calculate unit-specific incremental costs for cycling operation of fossil-fueled power plants. The three-level approach will allow users to choose an easy-to-use solution based on a pure "top-down" approach of peer-unit average values, a modified top-down approach, or a detailed "bottom-up" approach based on equipment condition assessment and engineering analysis.

1997-12-15T23:59:59.000Z

445

Bread Basket: a gaming model for estimating home-energy costs  

SciTech Connect

An instructional manual for answering the twenty variables on COLORADO ENERGY's computerized program estimating home energy costs. The program will generate home-energy cost estimates based on individual household data, such as total square footage, number of windows and doors, number and variety of appliances, heating system design, etc., and will print out detailed costs, showing the percentages of the total household budget that energy costs will amount to over a twenty-year span. Using the program, homeowners and policymakers alike can predict the effects of rising energy prices on total spending by Colorado households.

1982-01-01T23:59:59.000Z

446

Electric Power Costs in Texas in 1985 and 1990  

E-Print Network (OSTI)

A major problem associated with energy conservation projects is how to estimate the financial savings associated with a reduction in energy consumption. Although many conservation projects can be implemented in a matter of months, the energy savings may extend over a period of years or decades. The decision to initiate a conservation project often hinges upon the favorable outcome of an "engineering economics" or "present worth" analysis which compares present costs and future incomes. For a conservation project, four sets of data are required for the economic analysis: project cost, rate of return or discount rate, the amount of energy saved, and the future price of energy. Estimating the future price of electricity requires considerable effort since utilities in Texas will be using a mix of fuels. This paper analyzes the cost of generating electricity from nuclear power, out-of-state coal, in-state lignite, fuel oil, natural gas, geothermal, and solar power. These costs are then used to estimate system costs for an electric utility with various mixes of power plants. The electricity costs can then be used to determine the economic value of various conservation projects.

Gordon, J. B.; White, D. M.

1979-01-01T23:59:59.000Z

447

Reported Energy and Cost Savings from the DOE ESPC Program  

SciTech Connect

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy's Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 134 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For 133 of the 134 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $95.7 million, total reported cost savings were $96.8 million, and total guaranteed cost savings were $92.1 million. This means that on average: ESPC contractors guaranteed 96% of the estimated cost savings, projects reported achieving 101% of the estimated cost savings, and projects reported achieving 105% of the guaranteed cost savings. For 129 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 5.371 million MMBtu, and reported savings were 5.374 million MMBtu, just over 100% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 129 projects were 10.400 million MMBtu, and reported saving were 10.405 million MMBtu, again, just over 100.0% of the estimated energy savings.

Shonder, John A [ORNL; Slattery, Bob S [ORNL; Atkin, Erica [ORNL

2012-01-01T23:59:59.000Z

448

Low Cost Geothermal Separators BLISS Boundary Layer Inline Separator Scrubber  

DOE Green Energy (OSTI)

A new compact, low cost, and high performance separator is being developed to help reduce the installed and O and M cost of geothermal power generation. This device has been given the acronym ''BLISS'' that stands for ''Boundary Layer Inline Separator Scrubber''. The device is the first of a series of separators, and in the case of injectates, scrubbers to address the cost-reduction needs of the industry. The BLISS is a multi-positional centrifugal separator primarily designed to be simply installed between pipe supports, in a horizontal position. This lower profile reduces the height safety concern for workers, and significantly reduces the total installation cost. The vessel can demand as little as one-quarter (25%) the amount of steel traditionally required to fabricate many large vertical separators. The compact nature and high separating efficiency of this device are directly attributable to a high centrifugal force coupled with boundary layer control. The pseudo isokinetic flow design imparts a self-cleaning and scale resistant feature. This polishing separator is designed to remove moderate amounts of liquid and entrained solids.

Jung, Douglas; Wai, King

2000-05-26T23:59:59.000Z

449

Thermostat means adaptively controlling the amount of overshoot or undershoot of space temperature  

Science Conference Proceedings (OSTI)

This patent describes a clock thermostat adaptively controlling the amount of overshoot or undershoot of space temperature due to changes in the current temperature setpoint of the thermostat means, including: microcomputer means including real time clock and memory; data input means connected to the microcomputer to input a sequence of desired heat and cool control temperature setpoints and times for a desired temperature control by the thermostat; temperature sensor including connection to monitor temperature at the thermostat means; connection means connected to microcomputer to communicate a temperature at sensor means to the microcomputer; thermostat means further including output switch adapted to control heating and cooling equipment by thermostat means; microcomputer means and memory means including overshoot-undershoot correction program means which is operable to adjust a ramprate slope of a current temperature setpoint of thermostat means; overshoot-undershoot correction program and the memory means providing a ramprate slope that reduces an overshoot-undershoot of space temperature due to a change in current temperature setpoint; and overshoot-undershoot correction program means and memory means creating a new ramprate slope after a temperature setpoint change to progressively adjust the ramprate slope of the thermostat to limit the amount of overshoot-undershoot of the space temperature to an acceptable level.

Beckey, T.J.

1987-06-16T23:59:59.000Z

450

Simplified calculational procedure for determining the amount of intercepted sunlight in an imaging solar concentrator  

Science Conference Proceedings (OSTI)

In imaging solar concentrators, the solar radiation incident on a receiver surface depends upon both the overall concentrator shape and the angular distribution of light rays (sunshape) that reach the receiver. Calculation of the amount of sunlight incident on the receiver usually requires sophisticated computer programs. A simplified calculational procedure is presented to solve this problem for both one- and two-dimensional concentrators, with the results presented in graphical form. The procedure first determines the amount of sunshape broadening resulting from optical scattering caused by reflector or glazing materials, surface slope errors, or other ''mechanical'' factors such as tracking errors or vibrations. These optical effects are combined into an effective error cone which is convoluted with measured sunshapes in order to obtain effective, broadened sunshapes. Broadened sunshapes for a variety of effective error-cone distributions are calculated and presented. It is found that when the root-mean-square (RMS) width of the effective error cone is greater than approximately two times the RMS width of the incident sunshape, the broadened sunshape can be adequately described by a circular normal distribution. A specific example is included which illustrates the calculational procedure discussed in the paper.

Pettit, R.B.; Biggs, F.; Vittitoe, C.N.

1983-02-01T23:59:59.000Z

451

Vehicle Technologies Office: Fact #265: April 28, 2003 State Average Fuel  

NLE Websites -- All DOE Office Websites (Extended Search)

5: April 28, 5: April 28, 2003 State Average Fuel Prices to someone by E-mail Share Vehicle Technologies Office: Fact #265: April 28, 2003 State Average Fuel Prices on Facebook Tweet about Vehicle Technologies Office: Fact #265: April 28, 2003 State Average Fuel Prices on Twitter Bookmark Vehicle Technologies Office: Fact #265: April 28, 2003 State Average Fuel Prices on Google Bookmark Vehicle Technologies Office: Fact #265: April 28, 2003 State Average Fuel Prices on Delicious Rank Vehicle Technologies Office: Fact #265: April 28, 2003 State Average Fuel Prices on Digg Find More places to share Vehicle Technologies Office: Fact #265: April 28, 2003 State Average Fuel Prices on AddThis.com... Fact #265: April 28, 2003 State Average Fuel Prices The American Automobile Association tracks gasoline and diesel prices

452

Calibrating Multimodel Forecast Ensembles with Exchangeable and Missing Members Using Bayesian Model Averaging  

Science Conference Proceedings (OSTI)

Bayesian model averaging (BMA) is a statistical postprocessing technique that generates calibrated and sharp predictive probability density functions (PDFs) from forecast ensembles. It represents the predictive PDF as a weighted average of PDFs ...

Chris Fraley; Adrian E. Raftery; Tilmann Gneiting

2010-01-01T23:59:59.000Z

453

The U.S. average retail price for on-highway diesel fuel rose...  

Gasoline and Diesel Fuel Update (EIA)

The U.S. average retail price for on-highway diesel fuel rose this week The U.S. average retail price for on-highway diesel fuel rose slightly to 3.90 a gallon on Monday. That's...

454

What is the average heat content of U.S. coal? - FAQ - U.S ...  

U.S. Energy Information Administration (EIA)

What is the average heat content of U.S. coal? In 2012, the average heat content of coal produced in the United States was about 20.14 million ...

455

KOLMOGOROV THEORY VIA FINITE-TIME AVERAGES C. FOIAS1,2  

E-Print Network (OSTI)

]) or through a mathematically esoteric notion of generalized limit (see e.g. [2, 17]). In any Date: October 3-time averages without resorting to any esoteric relation with ensemble av- erages. Finite-time averages have

Rosa, Ricardo M. S.

456

From Short-Scale Atmospheric Variability to Global Climate Dynamics: Toward a Systematic Theory of Averaging  

Science Conference Proceedings (OSTI)

Traditionally, climate is defined by the properties of the averages of the meteorological fields over an appropriate time interval. In this paper the properties of the time-averaged observables of a red noise atmosphere and of a simplified model ...

C. Nicolis; G. Nicolis

1995-06-01T23:59:59.000Z

457

2012 Brief: Average 2012 crude oil prices remain near 2011 levels ...  

U.S. Energy Information Administration (EIA)

Average crude oil prices in 2012 were at historically high levels for the second year in a row. Brent crude oil averaged $111.67 per barrel, slightly above the 2011 ...

458

Leffler's Method of Estimating Average Temperatures of Appalachian Summits: Evaluation in New York  

Science Conference Proceedings (OSTI)

R. J. Leffler recently presented regression equations to estimate average monthly temperatures of Appalachian summits based on the long-term average temperatures on Mt. Washington, New Hampshire, and temperature lapse rates as a function of ...

Thomas W. Schmidlin

1982-05-01T23:59:59.000Z

459

Average Predictability Time. Part II: Seamless Diagnoses of Predictability on Multiple Time Scales  

Science Conference Proceedings (OSTI)

This paper proposes a new method for diagnosing predictability on multiple time scales without time averaging. The method finds components that maximize the average predictability time (APT) of a system, where APT is defined as the integral of ...

Timothy DelSole; Michael K. Tippett

2009-05-01T23:59:59.000Z

460

What was the highest U.S. average retail price of regular ...  

U.S. Energy Information Administration (EIA)

What was the highest U.S. average retail price of regular gasoline? According to EIA’s weekly survey, the U.S. average retail price of regular ...

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Vehicle Technologies Office: Fact #671: April 18, 2011 Average Truck Speeds  

NLE Websites -- All DOE Office Websites (Extended Search)

1: April 18, 1: April 18, 2011 Average Truck Speeds to someone by E-mail Share Vehicle Technologies Office: Fact #671: April 18, 2011 Average Truck Speeds on Facebook Tweet about Vehicle Technologies Office: Fact #671: April 18, 2011 Average Truck Speeds on Twitter Bookmark Vehicle Technologies Office: Fact #671: April 18, 2011 Average Truck Speeds on Google Bookmark Vehicle Technologies Office: Fact #671: April 18, 2011 Average Truck Speeds on Delicious Rank Vehicle Technologies Office: Fact #671: April 18, 2011 Average Truck Speeds on Digg Find More places to share Vehicle Technologies Office: Fact #671: April 18, 2011 Average Truck Speeds on AddThis.com... Fact #671: April 18, 2011 Average Truck Speeds The Federal Highway Administration studies traffic volume and flow on major

462

Smart Interpolation of Annually Averaged Air Temperature in the United States  

Science Conference Proceedings (OSTI)

Two “smart” interpolation procedures are presented and assessed with respect to their ability to estimate annual-average air temperatures at unsampled points in space from available station averages. Smart approaches examined here improve upon ...

Cort J. Willmott; Kenji Matsuura

1995-12-01T23:59:59.000Z

463

LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting  

E-Print Network (OSTI)

The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

Skelton, K

2000-01-01T23:59:59.000Z

464

Energy Department Report Calculates Emissions and Costs of Power Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report Calculates Emissions and Costs of Power Report Calculates Emissions and Costs of Power Plant Cycling Necessary for Increased Wind and Solar in the West Energy Department Report Calculates Emissions and Costs of Power Plant Cycling Necessary for Increased Wind and Solar in the West September 24, 2013 - 10:08am Addthis A new report released today by the Energy Department's National Renewable Energy Laboratory (NREL) examines the potential impacts of increasing wind and solar power generation on the operators of coal and gas plants in the West. To accommodate higher amounts of wind and solar power on the electric grid, utilities must ramp down and ramp up or stop and start conventional generators more frequently to provide reliable power for their customers - a practice called cycling. Grid operators typically cycle power plants to accommodate fluctuations in

465

Energy Department Report Calculates Emissions and Costs of Power Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Report Calculates Emissions and Costs of Power Energy Department Report Calculates Emissions and Costs of Power Plant Cycling Necessary for Increased Wind and Solar in the West Energy Department Report Calculates Emissions and Costs of Power Plant Cycling Necessary for Increased Wind and Solar in the West September 24, 2013 - 10:08am Addthis A new report released today by the Energy Department's National Renewable Energy Laboratory (NREL) examines the potential impacts of increasing wind and solar power generation on the operators of coal and gas plants in the West. To accommodate higher amounts of wind and solar power on the electric grid, utilities must ramp down and ramp up or stop and start conventional generators more frequently to provide reliable power for their customers - a practice called cycling.

466

Cost-Effectiveness of Electricity Energy Efficiency Programs  

E-Print Network (OSTI)

We analyze the cost-effectiveness of electric utility rate payer–funded programs to promote demand-side management (DSM) and energy efficiency investments. We develop a conceptual model that relates demand growth rates to accumulated average DSM capital per customer and changes in energy prices, income, and weather. We estimate that model using nonlinear least squares for two different utility samples. Based on the results for the most complete sample, we find that DSM expenditures over the last 18 years have resulted in a central estimate of 1.1 percent electricity savings at a weighted average cost to utilities (or other program funders) of about 6 cents per kWh saved. Econometrically-based policy simulations find that incremental DSM spending by utilities that had no or relatively low levels of average DSM spending per customer in 2006 could produce 14 billion kWh in additional savings at an expected incremental cost to the utilities of about 3 cents per kWh saved.

Toshi H. Arimura; Richard G. Newell; Karen Palmer

2009-01-01T23:59:59.000Z

467

Table US14. Average Consumption by Energy End Uses, 2005 Million ...  

U.S. Energy Information Administration (EIA)

a climate zone according to the 30-year average annual degree-days for an appropriate nearby weather station.

468

On the Average Value of Correlated Time Series, with Applications in Dendroclimatology and Hydrometeorology  

Science Conference Proceedings (OSTI)

In a number of areas of applied climatology, time series are either averaged to enhance a common underlying signal or combined to produce area averages. How well, then, does the average of a finite number (N) of time series represent the ...

T. M. L. Wigley; K. R. Briffa; P. D. Jones

1984-02-01T23:59:59.000Z

469

Development of the household sample for furnace and boilerlife-cycle cost analysis  

Science Conference Proceedings (OSTI)

Residential household space heating energy use comprises close to half of all residential energy consumption. Currently, average space heating use by household is 43.9 Mbtu for a year. An average, however, does not reflect regional variation in heating practices, energy costs, or fuel type. Indeed, a national average does not capture regional or consumer group cost impacts from changing efficiency levels of heating equipment. The US Department of Energy sets energy standards for residential appliances in, what is called, a rulemaking process. The residential furnace and boiler efficiency rulemaking process investigates the costs and benefits of possible updates to the current minimum efficiency regulations. Lawrence Berkeley National Laboratory (LBNL) selected the sample used in the residential furnace and boiler efficiency rulemaking from publically available data representing United States residences. The sample represents 107 million households in the country. The data sample provides the household energy consumption and energy price inputs to the life-cycle cost analysis segment of the furnace and boiler rulemaking. This paper describes the choice of criteria to select the sample of houses used in the rulemaking process. The process of data extraction is detailed in the appendices and is easily duplicated. The life-cycle cost is calculated in two ways with a household marginal energy price and a national average energy price. The LCC results show that using an national average energy price produces higher LCC savings but does not reflect regional differences in energy price.

Whitehead, Camilla Dunham; Franco, Victor; Lekov, Alex; Lutz, Jim

2005-05-31T23:59:59.000Z

470

Consumer Natural Gas Heating Costs  

Gasoline and Diesel Fuel Update (EIA)

5 Notes: Mild weather has minimized residential gas consumption over most of the past 3 winters. Unlike heating oil, average increases in natural gas prices last winter were small....

471

Preemptive scheduling with position costs  

E-Print Network (OSTI)

imization of the sum of the position costs of all the jobs, which will be denoted by. ??fi in the ?-field of the ..... http://www-poleia.lip6.fr/~sourd/project/position. 5 ...

472

Engineering Cost Analysis - Chapter 17  

NLE Websites -- All DOE Office Websites (Extended Search)

of these is that costs over the life of the project must be estimated based on some forecast, and forecasts have proven to be highly variable and frequently inaccurate. The...

473

Cost | OpenEI Community  

Open Energy Info (EERE)

Cost Cost Home Ocop's picture Submitted by Ocop(5) Member 18 April, 2013 - 13:41 MHK LCOE Reporting Guidance Draft Cost Current DOE LCOE numerical modeling Performance Tidal Wave To normalize competing claims of LCOE, DOE has developed-for its own use-a standardized cost and performance data reporting process to facilitate uniform calculation of LCOE from MHK device developers. This standardization framework is only the first version in what is anticipated to be an iterative process that involves industry and the broader DOE stakeholder community. Multiple files are attached here for review and comment.Upload Files: application/vnd.openxmlformats-officedocument.wordprocessingml.document icon device_performance_validation_data_request.docx application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon

474

Cost Effective Water Heating Solutions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ELECTRIC 0.92 ELECTRIC 0.92 ELECTRIC HPWH(2) HPWH(3) HPWH Standard 0.62 EF WH unless high natural gas costs (>1.50therm), in which case recommendations consistent with new...

475

,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member"  

U.S. Energy Information Administration (EIA) Indexed Site

6 Average Square Footage of Mobile Homes, by Housing Characteristics, 2009" 6 Average Square Footage of Mobile Homes, by Housing Characteristics, 2009" " Final" ,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member" "Housing Characteristics","Millions","Total2","Heated","Cooled","Total2","Heated","Cooled" "Total Mobile Homes",6.9,1087,985,746,413,375,283 "Census Region" "Northeast",0.5,1030,968,711,524,492,362 "Midwest",1.1,1090,1069,595,400,392,218 "South",3.9,1128,1008,894,423,378,335 "West",1.4,995,867,466,369,322,173 "Urban and Rural3" "Urban",3.5,1002,919,684,396,364,271

476

,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Average Square Footage of South Homes, by Housing Characteristics, 2009" 2 Average Square Footage of South Homes, by Housing Characteristics, 2009" " Final" ,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member" "Housing Characteristics","Millions","Total2","Heated","Cooled","Total2","Heated","Cooled" "Total South",42.1,1867,1637,1549,732,642,607 "South Divisions and States" "South Atlantic",22.2,1944,1687,1596,771,668,633 "Virginia",3,2227,1977,1802,855,759,692 "Georgia",3.5,2304,1983,1906,855,736,707 "Florida",7,1668,1432,1509,690,593,625 "DC, DE, MD, WV",3.4,2218,1831,1440,864,713,561

477

,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member"  

U.S. Energy Information Administration (EIA) Indexed Site

4 Average Square Footage of Single-Family Homes, by Housing Characteristics, 2009" 4 Average Square Footage of Single-Family Homes, by Housing Characteristics, 2009" " Final" ,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member" "Housing Characteristics","Millions","Total2","Heated","Cooled","Total2","Heated","Cooled" "Total Single-Family",78.6,2422,2002,1522,880,727,553 "Census Region" "Northeast",12.7,2843,2150,1237,1009,763,439 "Midwest",19.2,2721,2249,1664,1019,842,624 "South",29.7,2232,1945,1843,828,722,684 "West",16.9,2100,1712,1009,725,591,348 "Urban and Rural3"

478

,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member"  

U.S. Energy Information Administration (EIA) Indexed Site

0 Average Square Footage of Northeast Homes, by Housing Characteristics, 2009" 0 Average Square Footage of Northeast Homes, by Housing Characteristics, 2009" " Final" ,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member" "Housing Characteristics","Millions","Total2","Heated","Cooled","Total2","Heated","Cooled" "Total Northeast",20.8,2121,1663,921,836,656,363 "Northeast Divisions and States" "New England",5.5,2232,1680,625,903,680,253 "Massachusetts",2.5,2076,1556,676,850,637,277 "CT, ME, NH, RI, VT",3,2360,1781,583,946,714,234 "Mid-Atlantic",15.3,2080,1657,1028,813,647,402

479

,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member"  

U.S. Energy Information Administration (EIA) Indexed Site

5 Average Square Footage of Multi-Family Homes, by Housing Characteristics, 2009" 5 Average Square Footage of Multi-Family Homes, by Housing Characteristics, 2009" " Final" ,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member" "Housing Characteristics","Millions","Total2","Heated","Cooled","Total2","Heated","Cooled" "Total Multi-Family",28.1,930,807,535,453,393,261 "Census Region" "Northeast",7.6,991,897,408,471,426,194 "Midwest",5.6,957,857,518,521,466,282 "South",8.4,924,846,819,462,423,410 "West",6.5,843,606,329,374,269,146 "Urban and Rural3" "Urban",26.9,927,803,531,450,390,258

480

,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member"  

U.S. Energy Information Administration (EIA) Indexed Site

9 Average Square Footage of U.S. Homes, by Housing Characteristics, 2009" 9 Average Square Footage of U.S. Homes, by Housing Characteristics, 2009" " Final" ,"Housing Units1","Average Square Footage Per Housing Unit",,,"Average Square Footage Per Household Member" "Housing Characteristics","Millions","Total2","Heated","Cooled","Total2","Heated","Cooled" "Total",113.6,1971,1644,1230,766,639,478 "Census Region" "Northeast",20.8,2121,1663,921,836,656,363 "Midwest",25.9,2272,1898,1372,912,762,551 "South",42.1,1867,1637,1549,732,642,607 "West",24.8,1708,1374,800,628,506,294 "Urban and Rural3" "Urban",88.1,1857,1546,1148,728,607,450

Note: This page contains sample records for the topic "amount average cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Production Cost Optimization Project 2010  

Science Conference Proceedings (OSTI)

The EPRI Production Cost Optimization project assists participating members in implementing or enhancing heat rate optimization programs to reduce production costs through sustainable performance improvements. This Technical Update summarizes the status of the project and presents results for five (5) sites that have completed initial and follow-up assessments. A PCO assessment consists of benchmarking plant thermal performance using historical plant data along with an on-site performance appraisal to id...

2010-12-22T23:59:59.000Z

482

Development of the Household Sample for Furnace and Boiler Life-Cycle Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Development of the Household Sample for Furnace and Boiler Life-Cycle Cost Development of the Household Sample for Furnace and Boiler Life-Cycle Cost Analysis Title Development of the Household Sample for Furnace and Boiler Life-Cycle Cost Analysis Publication Type Report LBNL Report Number LBNL-55088 Year of Publication 2005 Authors Whitehead, Camilla Dunham, Victor H. Franco, Alexander B. Lekov, and James D. Lutz Document Number LBNL-55088 Pagination 22 Date Published May 31 Publisher Lawrence Berkeley National Laboratory City Berkeley Abstract Residential household space heating energy use comprises close to half of all residential energy consumption. Currently, average space heating use by household is 43.9 Mbtu for a year. An average, however, does not reflect regional variation in heating practices, energy costs, or fuel type. Indeed, a national average does not capture regional or consumer group cost impacts from changing efficiency levels of heating equipment. The US Department of Energy sets energy standards for residential appliances in, what is called, a rulemaking process. The residential furnace and boiler efficiency rulemaking process investigates the costs and benefits of possible updates to the current minimum efficiency regulations. Lawrence Berkeley National Laboratory (LBNL) selected the sample used in the residential furnace and boiler efficiency rulemaking from publically available data representing United States residences. The sample represents 107 million households in the country. The data sample provides the household energy consumption and energy price inputs to the life-cycle cost analysis segment of the furnace and boiler rulemaking. This paper describes the choice of criteria to select the sample of houses used in the rulemaking process. The process of data extraction is detailed in the appendices and is easily duplicated.The life-cycle cost is calculated in two ways with a household marginal energy price and a national average energy price. The LCC results show that using an national average energy price produces higher LCC savings but does not reflect regional differences in energy price.

483

Vehicle Technologies Office: Fact #622: May 10, 2010 Average Length of  

NLE Websites -- All DOE Office Websites (Extended Search)

2: May 10, 2010 2: May 10, 2010 Average Length of Light Vehicle Ownership to someone by E-mail Share Vehicle Technologies Office: Fact #622: May 10, 2010 Average Length of Light Vehicle Ownership on Facebook Tweet about Vehicle Technologies Office: Fact #622: May 10, 2010 Average Length of Light Vehicle Ownership on Twitter Bookmark Vehicle Technologies Office: Fact #622: May 10, 2010 Average Length of Light Vehicle Ownership on Google Bookmark Vehicle Technologies Office: Fact #622: May 10, 2010 Average Length of Light Vehicle Ownership on Delicious Rank Vehicle Technologies Office: Fact #622: May 10, 2010 Average Length of Light Vehicle Ownership on Digg Find More places to share Vehicle Technologies Office: Fact #622: May 10, 2010 Average Length of Light Vehicle Ownership on AddThis.com...

484

Vehicle Technologies Office: Fact #520: May 26, 2008 Average Price of a New  

NLE Websites -- All DOE Office Websites (Extended Search)

0: May 26, 2008 0: May 26, 2008 Average Price of a New Car, 1970-2006 to someone by E-mail Share Vehicle Technologies Office: Fact #520: May 26, 2008 Average Price of a New Car, 1970-2006 on Facebook Tweet about Vehicle Technologies Office: Fact #520: May 26, 2008 Average Price of a New Car, 1970-2006 on Twitter Bookmark Vehicle Technologies Office: Fact #520: May 26, 2008 Average Price of a New Car, 1970-2006 on Google Bookmark Vehicle Technologies Office: Fact #520: May 26, 2008 Average Price of a New Car, 1970-2006 on Delicious Rank Vehicle Technologies Office: Fact #520: May 26, 2008 Average Price of a New Car, 1970-2006 on Digg Find More places to share Vehicle Technologies Office: Fact #520: May 26, 2008 Average Price of a New Car, 1970-2006 on AddThis.com... Fact #520: May 26, 2008

485

Vehicle Technologies Office: Fact #219: June 3, 2002 Average Price of a New  

NLE Websites -- All DOE Office Websites (Extended Search)

9: June 3, 2002 9: June 3, 2002 Average Price of a New Car: 1970-2001 to someone by E-mail Share Vehicle Technologies Office: Fact #219: June 3, 2002 Average Price of a New Car: 1970-2001 on Facebook Tweet about Vehicle Technologies Office: Fact #219: June 3, 2002 Average Price of a New Car: 1970-2001 on Twitter Bookmark Vehicle Technologies Office: Fact #219: June 3, 2002 Average Price of a New Car: 1970-2001 on Google Bookmark Vehicle Technologies Office: Fact #219: June 3, 2002 Average Price of a New Car: 1970-2001 on Delicious Rank Vehicle Technologies Office: Fact #219: June 3, 2002 Average Price of a New Car: 1970-2001 on Digg Find More places to share Vehicle Technologies Office: Fact #219: June 3, 2002 Average Price of a New Car: 1970-2001 on AddThis.com... Fact #219: June 3, 2002

486

Vehicle Technologies Office: Fact #312: March 22, 2004 State Average Fuel  

NLE Websites -- All DOE Office Websites (Extended Search)

2: March 22, 2: March 22, 2004 State Average Fuel Prices, 2003 vs. 2004 to someone by E-mail Share Vehicle Technologies Office: Fact #312: March 22, 2004 State Average Fuel Prices, 2003 vs. 2004 on Facebook Tweet about Vehicle Technologies Office: Fact #312: March 22, 2004 State Average Fuel Prices, 2003 vs. 2004 on Twitter Bookmark Vehicle Technologies Office: Fact #312: March 22, 2004 State Average Fuel Prices, 2003 vs. 2004 on Google Bookmark Vehicle Technologies Office: Fact #312: March 22, 2004 State Average Fuel Prices, 2003 vs. 2004 on Delicious Rank Vehicle Technologies Office: Fact #312: March 22, 2004 State Average Fuel Prices, 2003 vs. 2004 on Digg Find More places to share Vehicle Technologies Office: Fact #312: March 22, 2004 State Average Fuel Prices, 2003 vs. 2004 on AddThis.com...

487

Vehicle Technologies Office: Fact #728: May 21, 2012 Average Trip Length is  

NLE Websites -- All DOE Office Websites (Extended Search)

8: May 21, 2012 8: May 21, 2012 Average Trip Length is Less Than Ten Miles to someone by E-mail Share Vehicle Technologies Office: Fact #728: May 21, 2012 Average Trip Length is Less Than Ten Miles on Facebook Tweet about Vehicle Technologies Office: Fact #728: May 21, 2012 Average Trip Length is Less Than Ten Miles on Twitter Bookmark Vehicle Technologies Office: Fact #728: May 21, 2012 Average Trip Length is Less Than Ten Miles on Google Bookmark Vehicle Technologies Office: Fact #728: May 21, 2012 Average Trip Length is Less Than Ten Miles on Delicious Rank Vehicle Technologies Office: Fact #728: May 21, 2012 Average Trip Length is Less Than Ten Miles on Digg Find More places to share Vehicle Technologies Office: Fact #728: May 21, 2012 Average Trip Length is Less Than Ten Miles on AddThis.com...

488

New England Wind Forum: Wind Compared to the Cost of Other Electricity  

Wind Powering America (EERE)

Wind Compared to the Cost of Other Electricity Generation Options Wind Compared to the Cost of Other Electricity Generation Options Figure 1: Average Cumulative Wind and Wholesale Power Prices by Region The chart shows average cumulative wind and wholesale power prices by region. Click on the graph to view a larger version. View a larger version of the graph. In terms of direct costs, larger wind farms in windier areas are now considered economically competitive with "conventional" fossil fuel power plants in many locations. In New England, direct costs for wind power at larger sites with strong winds are approaching the cost of alternatives, particularly given the recent high natural gas and oil prices. Figure 1 compares wind contract prices1 with wholesale electricity market prices in different U.S. regions for 2006. Although not directly comparable to wind prices due to wind's production timing and intermittence, the value of wind Renewable Energy Credits and carbon offsets, and the cost of wind integration and transmission, the average wholesale market energy price is a good indicator of the cost of alternative generation options. This graph demonstrates several points:

489

Formation resistivity measurements from within a cased well used to quantitatively determine the amount of oil and gas present  

DOE Patents (OSTI)

Methods to quantitatively determine the separate amounts of oil and gas in a geological formation adjacent to a cased well using measurements of formation resistivity are disclosed. The steps include obtaining resistivity measurements from within a cased well of a given formation, obtaining the porosity, obtaining the resistivity of formation water present, computing the combined amounts of oil and gas present using Archie's Equations, determining the relative amounts of oil and gas present from measurements within a cased well, and then quantitatively determining the separate amounts of oil and gas present in the formation.

Vail, III, William B. (Bothell, WA)

1997-01-01T23:59:59.000Z

490

Formation resistivity measurements from within a cased well used to quantitatively determine the amount of oil and gas present  

DOE Patents (OSTI)

Methods to quantitatively determine the separate amounts of oil and gas in a geological formation adjacent to a cased well using measurements of formation resistivity are disclosed. The steps include obtaining resistivity measurements from within a cased well of a given formation, obtaining the porosity, obtaining the resistivity of formation water present, computing the combined amounts of oil and gas present using Archie`s Equations, determining the relative amounts of oil and gas present from measurements within a cased well, and then quantitatively determining the separate amounts of oil and gas present in the formation. 7 figs.

Vail, W.B. III

1997-05-27T23:59:59.000Z

491

NUCLEAR ENERGY SYSTEM COST MODELING  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy’s Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative “Island” approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this island’s used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability distributions of key parameters and employs Monte Carlo sampling to arrive at an island’s cost probability density function (PDF). When comparing two NES to determine delta cost, strongly correlated parameters can be cancelled out so that only the differences in the systems contribute to the relative cost PDFs. For example, one comparative analysis presented in the paper is a single stage LWR-UOX system versus a two-stage LWR-UOX to LWR-MOX system. In this case, the first stage of both systems is the same (but with different fractional energy generation), while the second stage of the UOX to MOX system uses the same type transmuter but the fuel type and feedstock sources are different. In this case, the cost difference between systems is driven by only the fuel cycle differences of the MOX stage.

Francesco Ganda; Brent Dixon

2012-09-01T23:59:59.000Z

492

"Table 1. Aeo Reference Case Projection Results" "Variable","Average Absolute Percent Differences","Percent of Projections Over- Estimated"  

U.S. Energy Information Administration (EIA) Indexed Site

Aeo Reference Case Projection Results" Aeo Reference Case Projection Results" "Variable","Average Absolute Percent Differences","Percent of Projections Over- Estimated" "Gross Domestic Product" "Real Gross Domestic Product (Average Cumulative Growth)* (Table 2)",0.9772689079,42.55319149 "Petroleum" "Imported Refiner Acquisition Cost of Crude Oil (Constant $) (Table 3a)",35.19047501,18.61702128 "Imported Refiner Acquisition Cost of Crude Oil (Nominal $) (Table 3b)",34.68652106,19.68085106 "Total Petroleum Consumption (Table 4)",6.150682783,66.4893617 "Crude Oil Production (Table 5)",5.99969572,59.57446809 "Petroleum Net Imports (Table 6)",13.27260615,67.0212766 "Natural Gas"

493

Energy Department Announces $7 Million to Reduce Non-Hardware Costs of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Million to Reduce Non-Hardware Costs 7 Million to Reduce Non-Hardware Costs of Solar Energy Systems Energy Department Announces $7 Million to Reduce Non-Hardware Costs of Solar Energy Systems November 15, 2011 - 4:52pm Addthis Washington, D.C. - As part of the U.S. Department of Energy's SunShot Initiative, Energy Secretary Steven Chu today announced up to $7 million to reduce the non-hardware costs of residential and commercial solar energy installations. Made available through the SunShot Incubator Program, this funding will support the development of tools and approaches that reduce non-hardware, or "soft" costs, such as installation, permitting, interconnection, and inspection. These expenses can amount to up to half of the cost of residential systems. The Incubator will make the process of

494

Requirements for Using and Administering Cost-plus-award-fee Contracts:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements for Using and Administering Cost-plus-award-fee Contracts: Requirements for Using and Administering Cost-plus-award-fee Contracts: Pre and Post FAC 2005-37 Pre FAC 2005-37 Prior to Federal Acquisition Circular (FAC) 2005-37, which has an effective date of October 14, 2009, the Federal Acquisition Regulation (FAR) required the following in using and administering a cost-plus-award-fee contract: 1. neither a firm-fixed-price nor a fixed-priced incentive contract was appropriate; 2. the limitations on use of a cost reimbursement contract were met; 3. the supplies or services could be acquired at lower costs, and in certain instances, with improved delivery or technical performance, by relating the amount of fee to the contractor's performance; 4. it was neither feasible nor effective to use predetermined objective incentive targets for cost,

495

Policy 1306 Cost Sharing on Sponsored Projects  

E-Print Network (OSTI)

Policy 1306 Cost Sharing on Sponsored Projects Responsible Office Office of Research Administration committed cost sharing, and in-kind/matching requirements associated with sponsored projects. Definitions Cost Sharing A portion of total sponsored project costs not funded by the sponsor. Mandatory Cost

496

Sponsored Project Account Cost Transfer Explanation  

E-Print Network (OSTI)

Sponsored Project Account Cost Transfer Explanation Check-Off List December 2011 The explanations checked below best describe the reasons for why the cost transfers are being made. Costs as to how to allocate the cost, temporarily assigned the cost to an existing account that acted

He, Chuan

497

FACILITY AND ADMINISTRATIVE (INDIRECT) COSTS September 2007  

E-Print Network (OSTI)

, 2015. Definitions: Direct Costs: Costs that can be specifically identified with a particular project(s) Cost: A broad category of costs that are common to all research projects. "Facilities" is defined one F&A cost rate. If 50% or more of a project is performed off-campus (exclusive of any subcontract

Albertini, David

498

Fuel Cell System Cost for Transporationa--2008 Cost Estimate  

NLE Websites -- All DOE Office Websites (Extended Search)

Fuel Cell System Cost for Fuel Cell System Cost for Transportation-2008 Cost Estimate National Renewable Energy Laboratory 1617 Cole Boulevard * Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Independent Review Published for the U.S. Department of Energy Hydrogen Program NREL/BK-6A1-45457 May 2009 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or