Powered by Deep Web Technologies
Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

alt fuel | OpenEI  

Open Energy Info (EERE)

9 9 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142288369 Varnish cache server alt fuel Dataset Summary Description Alternative fueling stations are located throughout the United States and their availability continues to grow. The Alternative Fuels Data Center (AFDC) maintains a website where you can find alternative fuels stations near you or on a route, obtain counts of alternative fuels stations by state, Source Alternative Fuels Data Center Date Released December 13th, 2010 (4 years ago) Date Updated December 13th, 2010 (4 years ago) Keywords alt fuel alternative fuels alternative fuels stations biodiesel CNG compressed natural gas E85 Electricity ethanol hydrogen liquefied natural gas LNG

2

NREL Alt Fuel Lessons Learned: Hydrogen Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Britta K. Gross Britta K. Gross Manager, Hydrogen and Electrical Infrastructure General Motors Corporation NREL Alt Fuel Lessons Learned -- Hydrogen Infrastructure -- Sacramento, CA April 3, 2008 * Very limited access to today's stations - Stations not made available or... - No-go access contracts/liability clauses or ... - Assurance of access by customers/drivers * "OEM x vehicles/drivers have priority over OEM y" * e.g. "Can't fuel on Tuesday and Thursday afternoons 4-7pm" * Very limited availability of 700bar fueling - Every major OEM is developing 700bar capability (GM vehicles since 2004) - With only two exceptions, 700bar is the baseline * Current stations are largely behind-the-fence, demo-like, and lagging in technology availability (note: vehicle technology refreshed every 3-4 years)

3

hydrogen pilot plant, H2ICE vehicle testing INL alternative energy vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Pilot Plant, H2ICE Hydrogen Pilot Plant, H2ICE Vehicle Testing, & INL Alternative Energy Vehicles (Advanced Vehicle Testing Activity) Jim Francfort Discovery Center of Idaho - September 2005 INL/CON-05-00694 AVTA Presentation Outline * Arizona Public Service's Alternative Fuel (Hydrogen) Pilot Plant Design and Operations * Hydrogen internal combustion engine vehicle testing * Oil bypass filter system evaluation * Diesel engine idling testing * INL alternative fuel infrastructure * INL alternative fuel fleet * WWW information APS Alternative Fuel (Alt-Fuel) Pilot Plant - Partners * Arizona Public Service (APS) * Electric Transportation Applications (ETA) * Idaho National Laboratory (INL) * Started operations - 2002 Alt-Fuel Pilot Plant & Vehicle Testing - Objectives * Evaluate the safety & reliability of operating ICE

4

Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Waste Isolation Pilot Plant Waste Isolation Pilot Plant AFFIDAVIT FOR SURVIVING RELATIVE STATE _______________ ) ) ss: __________________ COUNTY OF _____________ ) That I, ________________________, am the _________________________ (Indicate relationship) of ___________________________, who is deceased and make the attached request pursuant to 10 CFR, Section 1008. That the information contained on the attached request is true and correct to the best of my knowledge and belief, and I am signing this authorization subject to the penalties provided in 18 U.S.C. 1001. ____________________________ SIGNATURE NOTARIZATION: SUBSCRIBED and SWORN to before me this ______day of __________, 20_____

5

Waste Isolation Pilot Plant - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Reports Waste Isolation Pilot Plant Review Report 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities, April 2013 Review Report 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant, November 2012 Activity Reports 2011 Orientation Visit to the Waste Isolation Pilot Plant, September 2011 Review Reports 2007 Independent Oversight Inspection of Emergency Management at the Carlsbad Field Office and Waste Isolation Pilot Plant, December 2007 Review Reports 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant - Summary Report, August 2002 Inspection of Environment, Safety, and Health Management at the Waste Isolation Pilot Plant - Volume I, August 2002

6

Property:EIA/861/AltFuelVehicle | Open Energy Information  

Open Energy Info (EERE)

AltFuelVehicle AltFuelVehicle Jump to: navigation, search This is a property of type Boolean. Description: Alt Fuel Vehicle Entity operated alternative-fueled vehicles during the year (Y or N) [1] References ↑ EIA Form EIA-861 Final Data File for 2008 - F861 File Layout-2008.doc Pages using the property "EIA/861/AltFuelVehicle" Showing 25 pages using this property. (previous 25) (next 25) A AEP Generating Company + true + AEP Texas Central Company + true + AEP Texas North Company + true + Access Energy Coop + true + Adams Electric Cooperative Inc + true + Agralite Electric Coop + true + Alabama Power Co + true + Ameren Illinois Company + true + Appalachian Power Co + true + Arizona Public Service Co + true + Atchison-Holt Electric Coop + true + Atlantic City Electric Co + true +

7

Property:EIA/861/AltFuelVehicle2 | Open Energy Information  

Open Energy Info (EERE)

AltFuelVehicle2 AltFuelVehicle2 Jump to: navigation, search This is a property of type Boolean. Description: Alt Fuel Vehicle2 Entity plans to operate alternative-fueled vehicles next year (Y or N) [1] References ↑ EIA Form EIA-861 Final Data File for 2008 - F861 File Layout-2008.doc Pages using the property "EIA/861/AltFuelVehicle2" Showing 25 pages using this property. (previous 25) (next 25) A AEP Generating Company + true + AEP Texas Central Company + true + AEP Texas North Company + true + Access Energy Coop + true + Adams Electric Cooperative Inc + true + Agralite Electric Coop + true + Alabama Power Co + true + Ameren Illinois Company + true + Appalachian Power Co + true + Arizona Public Service Co + true + Atchison-Holt Electric Coop + true + Atlantic City Electric Co + true +

8

Biochemical Conversion Pilot Plant (Fact Sheet)  

Science Conference Proceedings (OSTI)

This fact sheet provides information about Biochemical Conversion Pilot Plant capabilities and resources at NREL.

Not Available

2012-06-01T23:59:59.000Z

9

Pilot plant environmental conditions (OPDD Appendix C)  

DOE Green Energy (OSTI)

This is Appendix C to the Pilot Plant Overall Plant design description document for the 10-MW pilot central receiver plant to be located at Barstow, California. The environmental design criteria to be used for plant design day performance, operational limits, and survival environmental limits are specified. Data are presented on insolation, wind, temperature, and other meteorological conditions. (WHK)

Randall, C.M.; Whitson, M.E.; Coggi, J.V.

1978-08-15T23:59:59.000Z

10

Waste Isolation Pilot Plant | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations The mission of the Waste Isolation Pilot Plant site is to provide permanent, underground disposal of TRU and TRU-mixed wastes (wastes that also have hazardous chemical components). TRU waste consists of clothing, tools, and debris left from the research and production of nuclear weapons. TRU waste is contaminated with small amounts of plutonium and other TRU radioactive elements. Over the next 35 years, WIPP is expected to receive approximately 175,000 cubic meters of waste from various DOE sites. Enforcement September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006

11

Waste Isolation Pilot Plant | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP occupies approximately 28 square kilometers (16 square miles). The Waste Isolation Pilot Plant's history is relatively short, as it became operational in 1999. The facility...

12

Pilot Plant Options for the MFE Roadmap  

E-Print Network (OSTI)

&D ·Plasma Material Interface Fusion Nuclear Facility Component test facility (CTF)* Pilot plant&D ·Plasma Material Interface Fusion Nuclear Facility Component test facility (CTF)* Pilot plant for a Nuclear Next Step ITER Demo Fusion S&T Research & Development ·High performance, steady state ·Materials R

13

Waste Isolation Pilot Plant Activites  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DENVER, CO DENVER, CO WASTE ISOLATION PILOT PLANT ACTIVITIES ACTIVITIES O.W. EATON MANAGER, EXTERNAL EMERGENCY MANAGEMENT OPENING OF NEW ROUTES COMPLIANCE WITH PUBLIC LAW 102 579 WIPP LANDWITHDRAWL 102-579 WIPP LANDWITHDRAWL ACT OF 1992 1082 EMERGENCY PERSONNEL TRAINED IN 2010 *MERRTT 1082 EMERGENCY PERSONNEL TRAINED IN 2010 MERRTT *INCIDENT COMMAND SYSTEM *HOSPITAL PREPAREDNESS *HOSPITAL PREPAREDNESS *MEDICAL EXAMINER DISPATCHER (BETA) *DISPATCHER (BETA) RADIOLOGICAL TRAINING RADIOLOGICAL TRAINING FOR FOR FOR FOR HOSPITAL PERSONNEL HOSPITAL PERSONNEL Based on FEMA Course G-346 iNTRODUCTION 4 Hazardous Materials Accidents Part 1 WIPP EXTERNAL EMERGENCY MANAGEMENT EXERCISES CONDUCTED E ercise Location Date Exercise Location Date TRANSAX 90 Colorado Springs, Colorado November 8, 1990 1

14

Waste Isolation Pilot Plant Typifies Optimizing Resources to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Typifies Optimizing Resources to Maximize Results Waste Isolation Pilot Plant Typifies Optimizing Resources to Maximize Results March 5, 2013 - 12:00pm...

15

Waste Isolation Pilot Plant - Enforcement Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Enforcement Documents Enforcement Documents Waste Isolation Pilot Plant Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant, September 8, 2006 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC, related to Radiological Uptakes at the Mobile Visual Examination and Repackaging Facility at Lawrence Livermore National Laboratory, December 22, 2005 (EA-2005-08) - Washington TRU Solutions, LLC - Press Release, December 22, 2005 Enforcement Letter issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant, October 28, 2004

16

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education,...

17

Oversight Reports - Waste Isolation Pilot Plant | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight Reports - Waste Isolation Pilot Plant Oversight Reports - Waste Isolation Pilot Plant Oversight Reports - Waste Isolation Pilot Plant April 22, 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities November 28, 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant September 28, 2011 Independent Activity Report, Waste Isolation Pilot Plant - September 2011 Orientation Visit to the Waste Isolation Pilot Plant [HIAR-WIPP-2011-09-07] October 2, 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 Inspection of Environment, Safety, and Health and Emergency Management at

18

Waste Isolation Pilot Plant Status and Plans - 2010 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant Status and Plans - 2010 More...

19

Thermochemical Conversion Pilot Plant (Fact Sheet)  

DOE Green Energy (OSTI)

The state-of-the-art thermochemical conversion pilot plant includes several configurable, complementary unit operations for testing and developing various reactors, filters, catalysts, and other unit operations. NREL engineers and scientists as well as clients can test new processes and feedstocks in a timely, cost-effective, and safe manner to obtain extensive performance data on processes or equipment.

Not Available

2013-06-01T23:59:59.000Z

20

HTGR fuel refabrication pilot plant. Environmental statement  

SciTech Connect

The environmental effects of the construction and operation of the HTGR Fuel Refabrication Pilot Plant at Oak Ridge, Tenn. are examined. The descriptions include: the environment in the area including the history, geology, geography, hydrology, ecology, and land and water use; the facility and its effluents; impacts from construction and operation of the facility; alternatives to the proposed action; irreversible and irretrievable commitments of resources; and the benefits-cost analysis of the proposed plant operation. (LCL)

1974-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Enforcement Documents - Waste Isolation Pilot Plant | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Enforcement Documents - Waste Isolation Pilot Plant September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant October 28, 2004 Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004 Issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant August 30, 2004 Preliminary Notice of Violation, Washington TRU Solutions, LLC - EA-2004-08 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC,

22

ENVIRONMENTAL ASSESSMENT FOR OTEC PILOT PLANTS  

SciTech Connect

Logical and orderly progression of the OTEC program from conceptual designs through component testing to the goal of commercially viable OTEC plants require that the socio-legal requirements be met and the proper operating permits be obtained and maintained. This function is accomplished in a series of activities including: (1) Development and annual revision of a published OTEC Environmental Development Plan (EDP); (2) Compliance with NEPA/EPA and other regulatory requirements; and (3) Studies and research in support of the above. The Environmental Development Plan (EDP) lists the concerns, outlines the program to consider the effects and validity of such concerns on the OTEC program, and gives the time-table to meet the schedule, integrated with that of the engineering and design programs. The schedules of compliance activities and, to a lesser degree, research also are governed by the development progress of the technology. However, because of the lead time necessary to insure proper review the appropriate regulatory agencies, the environmental assessment program for the OTEC pilot plants (initially starting with the 10/40 MWe unit) is founded on the strategy of progressive improvement of previously accepted documentation. Based on experience with OTEC-1, the procedure for pilot plants will be: (1) Produce generic Environmental Assessment (EA) at the appropriate level of technology in advance of hardware contract; (2) Produce generic Environmental Impact Statement (EIS) at approximately the same time as the hardware procurement; (3) Monitor production of site specific supplement to the generic EIS prepared by the hardware contractor; (4) Assist pilot plant operator in applying and obtaining permits by providing current research and modeling data; (5) Monitor environmental program as required by regulatory agency; and (6) Use new site data for refining models for future pilot plant. assessments.

Wilde, P.

1980-06-01T23:59:59.000Z

23

Advanced Gasifier Pilot Plant Concept Definition  

DOE Green Energy (OSTI)

This report presents results from definition of a preferred commercial-scale advanced gasifier configuration and concept definition for a gasification pilot plant incorporating those preferred technologies. The preferred commercial gasifier configuration was established based on Cost Of Electricity estimates for an IGCC. Based on the gasifier configuration trade study results, a compact plug flow gasifier, with a dry solids pump, rapid-mix injector, CMC liner insert and partial quench system was selected as the preferred configuration. Preliminary systems analysis results indicate that this configuration could provide cost of product savings for electricity and hydrogen ranging from 15%-20% relative to existing gasifier technologies. This cost of product improvement draws upon the efficiency of the dry feed, rapid mix injector technology, low capital cost compact gasifier, and >99% gasifier availability due to long life injector and gasifier liner, with short replacement time. A pilot plant concept incorporating the technologies associated with the preferred configuration was defined, along with cost and schedule estimates for design, installation, and test operations. It was estimated that a 16,300 kg/day (18 TPD) pilot plant gasifier incorporating the advanced gasification technology and demonstrating 1,000 hours of hot-fire operation could be accomplished over a period of 33 months with a budget of $25.6 M.

Steve Fusselman; Alan Darby; Fred Widman

2005-08-31T23:59:59.000Z

24

Waste Isolation Pilot Plant Transportation Security  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP WIPP Transportation Security Gregory M. Sahd Security Manager Carlsbad Field Office U.S. Department of Energy Contact Information Gregory M. Sahd Security Operations Carlsbad Field Office * U.S. Department of Energy 575.234.8117 * Greg.Sahd@wipp.ws WIPP Transportation "...The (WIPP transportation) system is safer than that employed for any other hazardous material in the U.S...." - National Academy of Sciences, WIPP Panel Hanford Idaho National Engineering and Environmental Laboratory Los Alamos National Laboratory Rocky Flats Environmental Technology Site Savannah River Site Waste Isolation Pilot Plant Argonne National Laboratory - East Nevada Test Site Argonne National Laboratory - West Lawrence Livermore National Laboratory CBFO Manager Senior Management

25

Orientation Visit to the Waste Isolation Pilot Plant, September...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP-2011-09-07 Site: Waste Isolation Pilot Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the...

26

Waste Isolation Pilot Plant, Former Production Workers Screening...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Production Workers Screening Projects Waste Isolation Pilot Plant, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site:...

27

Hydrogen Fuel Pilot Plant and Hydrogen ICE Vehicle Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Fuel Pilot Plant and Hydrogen ICE Vehicle Testing Jim Francfort (INEEL) Don Karner (ETA) 2004 Fuel Cell Seminar - San Antonio Session 5B - Hydrogen DOE - Advanced Vehicle Testing...

28

Hanford Shipment Arrives Safely At Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

transuranic radioactive waste from the U.S. Department of Energy's (DOE's) Hanford Site arrived safely today at the Waste Isolation Pilot Plant (WIPP). The shipment...

29

Modeling Tomorrow's Biorefinery--the NREL Biochemical Pilot Plant  

DOE Green Energy (OSTI)

Brochure describing the capabilities of NREL's Biochemical Pilot Plant. In this facility, researchers test ideas for creating high-value products from cellulosic biomass.

Not Available

2008-03-01T23:59:59.000Z

30

Independent Activity Report, Waste Isolation Pilot Plant - September 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant - Waste Isolation Pilot Plant - September 2011 Independent Activity Report, Waste Isolation Pilot Plant - September 2011 September 2011 Orientation Visit to the Waste Isolation Pilot Plant [HIAR-WIPP-2011-09-07] The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE Carlsbad Field Office (CBFO) and the nuclear facility at the Waste Isolation Pilot Plant (WIPP) at Carlsbad, NM, on September 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's activities, and identify specific activities that HSS can perform to carry out its

31

Independent Oversight Inspection, Waste Isolation Pilot Plant - December  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant - Waste Isolation Pilot Plant - December 2007 Independent Oversight Inspection, Waste Isolation Pilot Plant - December 2007 December 2007 Inspection of Emergency Management at the Carlsbad Field Office and Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Waste Isolation Pilot Plant (WIPP) from July through September 2007. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight. This 2007 inspection found that despite isolated areas of program improvement since 2002, WIPP's level of emergency preparedness has largely declined over a period marked by a dramatic increase in the pace of waste receipt and storage activities at the site.

32

Independent Oversight Review, Waste Isolation Pilot Plant - August 2000 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review, Waste Isolation Pilot Plant - August Review, Waste Isolation Pilot Plant - August 2000 Independent Oversight Review, Waste Isolation Pilot Plant - August 2000 August 2000 Emergency Management Program Review at the Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Secretary of Energy's Office of Independent Oversight and Performance Assurance, conducted a review of the emergency management program at the Waste Isolation Pilot Plant (WIPP) in May 2000. The primary purpose of this review was twofold: to assess selected emergency management system elements that focus on WIPP's readiness to protect site personnel and the public from the consequences of onsite events that may result in the release of hazardous materials; and to evaluate the site's ability to provide appropriate information or

33

DOE - Office of Legacy Management -- Pasadena Chemical Corp Pilot Plant -  

Office of Legacy Management (LM)

Pasadena Chemical Corp Pilot Plant Pasadena Chemical Corp Pilot Plant - TX 01 FUSRAP Considered Sites Site: PASADENA CHEMICAL CORP., PILOT PLANT (TX.01) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Olin Mathieson Chemical Corp. Mobil Mining and Minerals TX.01-2 TX.01-1 Location: Pasadena , Texas TX.01-2 Evaluation Year: 1985 TX.01-1 Site Operations: Process development studies and pilot plant testing of uranium recovery from phosphoric acid during the mid-1950s. TX.01-3 Site Disposition: Eliminated - No Authority TX.01-1 TX.01-4 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Natural Uranium TX.01-3 Radiological Survey(s): Yes TX.01-2 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to PASADENA CHEMICAL CORP., PILOT PLANT

34

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Waste Isolation Pilot Plant, Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 August 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. The results of this review indicate that, overall, CBFO and WTS have

35

Waste Isolation Pilot Plant Safety Analysis Report  

Science Conference Proceedings (OSTI)

The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions`` (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.`` This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment.

NONE

1995-11-01T23:59:59.000Z

36

THOREX PILOT PLANT: CRITICALITY REVIEW OF THE THOREX PILOT PLANT USING THE INT-23 PROCESS  

SciTech Connect

The results of a criticality review of the ORNL Thorex pilot plant are presented for the condition where a low TBP (INT-23) flowsheet is used in recovering U/sup 233/ from irradiated thorium. Criticality control will be maintained by limiting the U/sup 233/ inventory in the solvent extraction system to less than 550g by means of streamvolume and U/sup 233/ material balances determined at 8 hr intervals. Equipment modification and improved operating procedures for safe plant operation are outlined. (auth)

McDuffee, W.T.; Yarbro, O.O.

1958-07-01T23:59:59.000Z

37

Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants  

DOE Green Energy (OSTI)

This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

1981-02-01T23:59:59.000Z

38

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2008-03-12T23:59:59.000Z

39

Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) preparedness for severe natural phenomena events (NPEs). The HSS Office of Safety and Emergency Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a severe NPE. Independent Oversight Review, Waste Isolation Pilot Plant - November 2012

40

DOE Waste Isolation Pilot Plant Receives EPA Recertification | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Receives EPA Recertification Waste Isolation Pilot Plant Receives EPA Recertification DOE Waste Isolation Pilot Plant Receives EPA Recertification March 29, 2006 - 9:42am Addthis CARLSBAD, NM - The U.S. Department of Energy's (DOE) Carlsbad Field Office today reached a significant milestone when its Waste Isolation Pilot Plant (WIPP) was recertified by the U.S. Environmental Protection Agency (EPA). This decision indicates that after a thorough evaluation of the physical state and performance of the facility, the WIPP meets EPA regulatory requirements for facilities that dispose of transuranic waste. The waste facility recertification process occurs every five years and is directed by Congress in the WIPP Land Withdrawal Act (LWA). "EPA's recertification reinforces the important mission of WIPP to safely

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Valuation of potash reserves at the Waste Installation Pilot Plant  

Science Conference Proceedings (OSTI)

Monte Carlo simulation was used in conjunction with several random walk price and cost models to value potash reserves at the Waste Installation Pilot Plant (WIPP) site new Carlsbad, New Mexico. Selection of market price and product processing cost models ...

Peter C. Anselmo

1996-11-01T23:59:59.000Z

42

Independent Activity Report, Waste Isolation Pilot Plant - September...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2011 September 2011 Orientation Visit to the Waste Isolation Pilot Plant HIAR-WIPP-2011-09-07 The U.S. Department of Energy (DOE) Office of Enforcement and Oversight,...

43

DOE - Office of Legacy Management -- Waste Isolation Pilot Plant - 019  

Office of Legacy Management (LM)

Waste Isolation Pilot Plant - 019 Waste Isolation Pilot Plant - 019 FUSRAP Considered Sites Site: Waste Isolation Pilot Plant (019) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Waste Isolation Pilot Plant, or WIPP, is the world¿s first underground repository licensed to safely and permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists primarily of clothing, tools, rags, and other disposable items contaminated with small amounts of radioactive elements, mostly plutonium. After more than 20 years of scientific study and public input, WIPP began operations on March 26, 1999. Located in the remote

44

2007 Annual Mitigation Report for the Waste Isolation Pilot Plant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CFR Part 194, Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance with the 40 CFR Part 191 Disposal Regulations. 25. U.S....

45

US Department of Energy Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

US Department of Energy Waste Isolation Pilot Plant New Mexico Statute 24-16 Sections 1-4 Compliance Policy DOEWIPP-11-3480 Revision 0 September 2011 The U.S. Department of Energy...

46

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report- August 2002  

Energy.gov (U.S. Department of Energy (DOE))

Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant

47

Inspection of Emergency Management at the Waste Isolation Pilot Plant -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management at the Waste Isolation Pilot Emergency Management at the Waste Isolation Pilot Plant - Volume II, August 2002 Inspection of Emergency Management at the Waste Isolation Pilot Plant - Volume II, August 2002 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health and emergency management programs at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the WIPP emergency management program. The results of the review of the WIPP environment, safety, and

48

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not have detrimental effects on the environment. This EMP is to be reviewed annually and updated every three years unless otherwise requested by the DOE or contractor.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-02-19T23:59:59.000Z

49

Waste Isolation Pilot Plant Typifies Optimizing Resources to Maximize  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plant Typifies Optimizing Resources to Plant Typifies Optimizing Resources to Maximize Results Waste Isolation Pilot Plant Typifies Optimizing Resources to Maximize Results March 5, 2013 - 12:00pm Addthis EM Carlsbad Field Office (CBFO) Manager Joe Franco, right, presents a memento to EM Senior Advisor Dave Huizenga EM Carlsbad Field Office (CBFO) Manager Joe Franco, right, presents a memento to EM Senior Advisor Dave Huizenga Three HalfPACT transportation packages on a Waste Isolation Pilot Plant (WIPP) truck are parked inside the exhibit hall at the 2013 Waste Management Conference. WIPP featured the exhibit as part of outreach to visitors at the annual gathering in Phoenix. Three HalfPACT transportation packages on a Waste Isolation Pilot Plant (WIPP) truck are parked inside the exhibit hall at the 2013 Waste

50

DOE - Office of Legacy Management -- Reduction Pilot Plant - WV 01  

Office of Legacy Management (LM)

Reduction Pilot Plant - WV 01 Reduction Pilot Plant - WV 01 FUSRAP Considered Sites Site: REDUCTION PILOT PLANT (WV.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: International Nickel Company WV.01-1 Location: Cole Street at Alterizer Ave. , Huntington , West Virginia WV.01-2 Evaluation Year: 1987 WV.01-1 Site Operations: Manufactured powdered Nickel for use at Paducah and Portsmouth gaseous diffusion plants and Nickel plated a small quantity of Uranium slugs. WV.01-2 WV.01-1 Site Disposition: Eliminated - Limited quantities of radioactive material used on the site. Potential for residual radioactive material from AEC operations conducted at the site considered remote - confirmed by radiological survey. WV.01-1 WV.01-3

51

MHK Technologies/European Pico Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

European Pico Pilot Plant European Pico Pilot Plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage European Pico Pilot Plant.jpg Technology Profile Primary Organization Wave Energy Centre Project(s) where this technology is utilized *MHK Projects/OWC Pico Power Plant Technology Resource Click here Wave Technology Type Click here Oscillating Water Column Technology Readiness Level Click here TRL 4: Proof of Concept Technology Description A bottom mounted shoreline oscillating water column structure equipped with a horizontal axis Wells turbine generator set and a guide vane stator installed on each side of the rotor Control options are facilitated by a relief valve presently a slow acting valve with plans to substitute a fast acting mechanism in the wave chamber

52

The DOE Bioethanol Pilot Plant: A Tool for Commercialization  

SciTech Connect

With funding from the DOE National Biofuels Program, NREL has constructed a fermentation pilot plant facility. The plant was explicitly designed to assist industry and outside researchers develop commercial bioprocessing technology. Companies that are exploring biofuels technologies can utilize the facilities and expertise of NREL through a variety of flexible business-venture arrangements.

Brown, H.

2000-08-31T23:59:59.000Z

53

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives November 14, 2013 - 12:00pm Addthis Approximately 1.8 million tons of salt have been mined out of the underground at WIPP. Approximately 1.8 million tons of salt have been mined out of the underground at WIPP. Proceeds from the WIPP salt allowed hundreds of southeast New Mexico students to learn about resource conservation. Proceeds from the WIPP salt allowed hundreds of southeast New Mexico students to learn about resource conservation. The crushed salt is used as a supplement in cattle feed. Since the salt from WIPP has been mined from the middle of a large salt formation, its quality is high, according to Magnum Minerals.

54

Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation Exercise Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation Exercise May 1, 2012 - 12:00pm Addthis A firefighter trained to respond to radiological events performs a radiological survey of the WIPP shipping package as part of a WIPP transportation exercise in Morgan County, Georgia. A firefighter trained to respond to radiological events performs a radiological survey of the WIPP shipping package as part of a WIPP transportation exercise in Morgan County, Georgia. The on-scene incident commander briefs a responder during an April 17 WIPP transportation exercise in Georgia. The on-scene incident commander briefs a responder during an April 17 WIPP transportation exercise in Georgia.

55

Waste Isolation Pilot Plant Construction Workers, Construction Worker  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Construction Workers, Construction Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

56

Waste Isolation Pilot Plant 2003 Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

submitted as required to: submitted as required to: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Prices available from (615) 576-8401 Additional information about this document may be obtained by calling (800) 336-9477. Copies may be obtained by contacting the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Road, Springfield, VA 22161 Processing and final preparation of this report was performed by the Waste Isolation Pilot Plant Management and Operating Contractor for the U.S. Department of Energy under Contract No. DE-AC04-01AL66444. Waste Isolation Pilot Plant 2003 Site Environmental Report DOE/WIPP 04-2225 i EXECUTIVE SUMMARY The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose

57

Orientation Visit to the Waste Isolation Pilot Plant, September 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP-2011-09-07 WIPP-2011-09-07 Site: Waste Isolation Pilot Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Orientation Visit to the Waste Isolation Pilot Plant Dates of Activity : 09/07/2011 Report Preparer: Joseph P. Drago Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE Carlsbad Field Office (CBFO) and the nuclear facility at the Waste Isolation Pilot Plant (WIPP) at Carlsbad, NM, on September 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's

58

Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April April 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a shadowing oversight activity to review the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) oversight of the Waste Isolation Pilot Plant (WIPP). This Independent Oversight activity was performed by HSS Office of Safety and Emergency Management Evaluations personnel shadowing the CBFO's review of the WIPP operating contractor's Work Control Improvement Plan implementation and effectiveness review, and CBFO's annual review of the contractor's Integrated Safety Management System (ISMS), specifically

59

Waste Isolation Pilot Plant Attracts World Interest | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Attracts World Interest Waste Isolation Pilot Plant Attracts World Interest Waste Isolation Pilot Plant Attracts World Interest June 26, 2013 - 12:00pm Addthis Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall. Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall.

60

Waste Isolation Pilot Plant Attracts World Interest | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Isolation Pilot Plant Attracts World Interest Isolation Pilot Plant Attracts World Interest Waste Isolation Pilot Plant Attracts World Interest June 26, 2013 - 12:00pm Addthis Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall. Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall. A group of Texas A&M University nuclear engineering students shows enthusiasm for WIPP’s underground operations in May 2013.

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects(Redirected from MHK Projects/bioSTREAM Pilot Plant) Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

62

Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation Exercise Georgia Hosts Multi-Agency Waste Isolation Pilot Plant Transportation Exercise May 1, 2012 - 12:00pm Addthis A firefighter trained to respond to radiological events performs a radiological survey of the WIPP shipping package as part of a WIPP transportation exercise in Morgan County, Georgia. A firefighter trained to respond to radiological events performs a radiological survey of the WIPP shipping package as part of a WIPP transportation exercise in Morgan County, Georgia. The on-scene incident commander briefs a responder during an April 17 WIPP transportation exercise in Georgia. The on-scene incident commander briefs a responder during an April 17 WIPP transportation exercise in Georgia.

63

Orientation Visit to the Waste Isolation Pilot Plant, September 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP-2011-09-07 WIPP-2011-09-07 Site: Waste Isolation Pilot Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Orientation Visit to the Waste Isolation Pilot Plant Dates of Activity : 09/07/2011 Report Preparer: Joseph P. Drago Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE Carlsbad Field Office (CBFO) and the nuclear facility at the Waste Isolation Pilot Plant (WIPP) at Carlsbad, NM, on September 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's

64

Hydrogen Fuel Pilot Plant and Hydrogen ICE Vehicle Testing  

DOE Green Energy (OSTI)

The U.S. Department Energy's Advanced Vehicle Testing Activity (AVTA) teamed with Electric Transportation Applications (ETA) and Arizona Public Service (APS) to develop the APS Alternative Fuel (Hydrogen) Pilot Plant that produces and compresses hydrogen on site through an electrolysis process by operating a PEM fuel cell in reverse; natural gas is also compressed onsite. The Pilot Plant dispenses 100% hydrogen, 15 to 50% blends of hydrogen and compressed natural gas (H/CNG), and 100% CNG via a credit card billing system at pressures up to 5,000 psi. Thirty internal combustion engine (ICE) vehicles (including Daimler Chrysler, Ford and General Motors vehicles) are operating on 100% hydrogen and 15 to 50% H/CNG blends. Since the Pilot Plant started operating in June 2002, they hydrogen and H/CNG ICE vehicels have accumulated 250,000 test miles.

J. Francfort (INEEL)

2005-03-01T23:59:59.000Z

65

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives November 14, 2013 - 12:00pm Addthis Approximately 1.8 million tons of salt have been mined out of the underground at WIPP. Approximately 1.8 million tons of salt have been mined out of the underground at WIPP. Proceeds from the WIPP salt allowed hundreds of southeast New Mexico students to learn about resource conservation. Proceeds from the WIPP salt allowed hundreds of southeast New Mexico students to learn about resource conservation. The crushed salt is used as a supplement in cattle feed. Since the salt from WIPP has been mined from the middle of a large salt formation, its quality is high, according to Magnum Minerals.

66

APS ALternative Fuel (Hydrogen) Pilot Plant Monitoring System  

NLE Websites -- All DOE Office Websites (Extended Search)

502 502 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Advanced Vehicle Testing Activity APS Alternative Fuel (Hydrogen) Pilot Plant Monitoring System Dimitri Hochard James Francfort July 2005 Idaho National Laboratory Operated by Battelle Energy Alliance INL/EXT-05-00502 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Advanced Vehicle Testing Activity APS Alternative Fuel (Hydrogen) Pilot Plant Monitoring System Dimitri Hochard a James Francfort b July 2005 Idaho National Laboratory Transportation Technology Department Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Assistant Secretary for Energy Efficiency and Renewable Energy Under DOE Idaho Operations Office

67

SOLERAS - Solar Energy Water Desalination Project: Catalytic. System design final report. Volume 2. Preliminary pilot plant design  

Science Conference Proceedings (OSTI)

The preliminary design of a solar water desalination pilot plant is presented. Pilot plant drawings and process descriptions are provided. Use of solar and wind energy are discussed. Testing, performance and cost of the pilot plant are studied. (BCS)

Not Available

1986-01-01T23:59:59.000Z

68

EA-1870: Utah Coal and Biomass Fueled Pilot Plant, Kanab, Kane...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Utah Coal and Biomass Fueled Pilot Plant, Kanab, Kane County, Utah EA-1870: Utah Coal and Biomass Fueled Pilot Plant, Kanab, Kane County, Utah Summary This EA evaluates the...

69

Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Corn-to-Ethanol Corn-to-Ethanol Research Pilot Plant to someone by E-mail Share Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Facebook Tweet about Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Twitter Bookmark Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Google Bookmark Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Delicious Rank Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on Digg Find More places to share Alternative Fuels Data Center: Corn-to-Ethanol Research Pilot Plant on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Corn-to-Ethanol Research Pilot Plant The Illinois Ethanol Research Advisory Board manages and operates the

70

500-kW DCHX pilot-plant evaluation testing  

DOE Green Energy (OSTI)

Field tests with the 500 kW Direct Contact Pilot Plant were conducted utilizing brine from well Mesa 6-2. The tests were intended to develop comprehensive performance data, design criteria, and economic factors for the direct contact power plant. The tests were conducted in two phases. The first test phase was to determine specific component performance of the DCHX, turbine, condensers and pumps, and to evaluate chemical mass balances of non-condensible gases in the IC/sub 4/ loop and IC/sub 4/ in the brine stream. The second test phase was to provide a longer term run at nearly fixed operating conditions in order to evaluate plant performance and identify operating cost data for the pilot plant. During these tests the total accumulated run time on major system components exceeded 1180 hours with 777 hours on the turbine prime mover. Direct contact heat exchanger performance exceeded the design prediction.

Hlinak, A.; Lee, T.; Loback, J.; Nichols, K.; Olander, R.; Oshmyansky, S.; Roberts, G.; Werner, D.

1981-10-01T23:59:59.000Z

71

Emergency Management Program Review at the Waste Isolation Pilot Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Waste Isolation Pilot Plant Emergency Management Program Review at the May 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 6 Hazards Survey and Hazards Assessments .................................. 6 Program Plans, Procedures, and Responder Performance ........ 9 Training, Drills, and Exercises ..................................................... 13 Emergency Public Information and Offsite Response Interfaces ....................................................................................... 15 Feedback and Continuous Improvement Process

72

NREL Bioprocessing Pilot Plant: Available for Industrial Use  

SciTech Connect

Microbial bioprocessing can produce a myriad of valuable products. If you are an industry needing small- or large-scale trials to test or advance a bioprocessing technology, National Bioenergy Center (NBC) facilities at the National Renewable Energy Laboratory (NREL) in Golden, Colorado, may allow you to use world-class systems and expertise without the expense of building your own pilot plant.

2003-10-01T23:59:59.000Z

73

Raft River 5-MW(e) geothermal pilot plant project  

SciTech Connect

The Raft River 5-MW(e) Pilot Plant Project was started in 1976. Construction is scheduled for completion in July 1980, with three years of engineering and operational testing to follow. The plant utilized a 280/sup 0/F geothermal fluid energy source and a dual boiling isobutane cycle. Developmental efforts are in progress in the areas of down hole pumps and chemical treatment of geothermal fluid for cooling tower makeup.

Rasmussen, T.L.; Whitbeck, J.F.

1980-01-01T23:59:59.000Z

74

Pilot-Plant - a shortened path to fusion power  

SciTech Connect

Previous fusion reactor studies have focused on the characteristics of fusion reactors in a mature, commercial market, on full-scale "demonstration reactors" as commercial prototypes, and on other engineering development facilities. The projected large size and high capital cost of the development facilities present significant practical impediments to the development of fusion as a commercial power source. In other technologies, "pilot plants" have been constructed in advance of fullscale facilities. Such plants have had the characteristics of small size, low capital cost, and a limited set of objectives, while still having the integrated performance deemed necessary to gain experience with the operating characteristics of the new technology. A range of possible tokamak fusion pilot plants is considered, having as the primary objective providing requisite fusion power experience to an electric utility prior to construction of a full-scale demonstration reactor. Two approaches are explored, having the characteristics of either net electricity production or only the production of high-grade heat. The effects of choices such as mode of plasma heating and normal versus superconducting coils are also examined. Since tokamak scaling laws do not seem to permit simply "miniaturizing" the DEMO, fusion pilot plant designs incorporate only certain essential features of a power plant, while leaving the development of other features to complementary, specialized facilities.

Dean, S.O. [Fusion Power Associates; Peng, Yueng Kay Martin [ORNL

1993-01-01T23:59:59.000Z

75

Comparison of Options for a Pilot Plant Fusion Nuclear Mission  

Science Conference Proceedings (OSTI)

A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The pilot plant mission encompassed component test and fusion nuclear science missions plus the requirement to produce net electricity with high availability in a device designed to be prototypical of the commercial device. Three magnetic configuration options were developed around this mission: the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS). With the completion of the study and separate documentation of each design option a question can now be posed; how do the different designs compare with each other as candidates for meeting the pilot plant mission? In a pro/con format this paper will examine the key arguments for and against the AT, ST and CS magnetic configurations. Key topics addressed include: plasma parameters, device configurations, size and weight comparisons, diagnostic issues, maintenance schemes, availability influences and possible test cell arrangement schemes.

Brown, T; Goldston, R J; El-Guebaly, L; Kessel, C; Neilson, G H; Malang, S; Menard, J E; Prager, S; Waganer, L; Titus, P

2012-08-27T23:59:59.000Z

76

Raft River 5MW Geothermal Pilot Plant  

SciTech Connect

Elements of design of the 5 MW(e) binary cycle plant to be built in the Raft River Valley in Idaho are discussed. Advantages of the dual boiling cycle for use with moderate temperature (250 to 350/sup 0/F) resources are discussed. A breakdown of the heat loads and power requirements is presented. Various components, including pumps, heat exchangers, cooling tower, turbine-generators, and production and injection systems, are described. (JGB)

Whitbeck, J.F.; Piscitella, R.R.

1978-01-01T23:59:59.000Z

77

Waste Isolation Pilot Plant 2002 Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

reproduced directly from the best possible copy. It is reproduced directly from the best possible copy. It is available to DOE and DOE contractors from the following address: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Prices available from (615) 576-8401 Available to the public from the National Technical Information Services United States Department of Commerce 5285 Port Royal Road Springfield, Virginia 22161 Processing and final preparation of this report was performed by the Waste Isolation Pilot Plant Management and Operating Contractor for the U.S. Department of Energy under Contract No. DE-AC04-01AL66444. Waste Isolation Pilot Plant 2002 Site Environmental Report DOE/WIPP 03-2225 iii ACKNOWLEDGMENTS We appreciate the reviews by Harold Johnson and Dr. E. B. Nuckols of the United

78

MHK Projects/bioWAVE Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

bioWAVE Pilot Plant bioWAVE Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-37.8197,"lon":144.964,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

79

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

80

U.S. Department of Energy Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites

WIPP Community Relations Plan Web Page Click Here Current Solicitations Current Contracts Carlsbad Field Office The U.S. Department of Energy Carlsbad Field Office has responsibility for the Waste Isolation Pilot Plant and the NationalTransuranic (TRU) Program. The office's mission is to provide safe, compliant, and efficient characterization, transportation, and disposal of defense-related TRU waste. Its vision is to enable a nuclear future for our country by providing safe and environmentally responsible waste management. Overview Overview opening screen The Waste Isolation Pilot Plant, or WIPP, safely disposes of the nation's defense-related transuranic radioactive waste. Located in the Chihuahuan Desert, outside Carlsbad, N.M., WIPP began disposal operations in March 1999.

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines December 23, 2013 - 12:00pm Addthis Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. The clothing drive’s organizers — Margaret Gee (left), Yolanda Navarrete (center) and Dana Dorr — hold up some of the donated coats before providing them to Carlsbad area schools. Gee is with CBFO and Navarrete and Dorr are with Nuclear Waste Partnership (NWP). NWP's Yolanda Salmon, another drive organizer, is not pictured.

82

Proposed OTEC Punta Tuna Pilot Plant  

SciTech Connect

Siting features and the design of a 40 MWe prototype OTEC for installation at Punta Tuna, Puerto Rico are presented. An annual average temperature gradient of 40 F from surface to 3,000 ft depth, a sharp coastal drop-off, projected benign environmental effects, and expensive indigenous power supplies are seen as favorable for fixed, floating, or grazing OTEC plants. The Punta Tuna design is for a platform fitted with generators in 300 ft of water, submarine cable power transmission, fiberglass seawater pipes, NH3 as a working fluid, and heat exchangers at the 300 ft depth, below hurricane wind and wave action. Methods of installing the 3,000 ft cold water pipes are discussed, and the use of OTEC derived electricity for aluminum smelting in the Caribbean is indicated.

Marina, J.; Perez, F.

1981-01-01T23:59:59.000Z

83

Solar Pilot Plant, Phase I: preliminary design report. Volume VII. Pilot plant cost, commercial plant cost and performance. CDRL item 2  

DOE Green Energy (OSTI)

Cost estimates are presented for the Solar Pilot Plant by cost breakdown structure element, with a commitment schedule and an expenditure schedule. Cost estimates are given for a Commercial Plant, including several point costs for plants with various solar multiples and storage times. Specific questions (ERDA) pertaining to commercial plant design and performance data are addressed. The cost estimates are supplemented by two books of vendor and subcontractor cost data.

None

1977-06-01T23:59:59.000Z

84

PRFR PILOT LEACHING PLANT-PRELIMINARY PROCESS DESIGN  

SciTech Connect

The preliminary process design of a PRFR pilot leaching plant, the proposed location of which is in Cell B of Building 3026 at ORNL, is considered. Chemical, physical, and nuclear parameters are investigated to assure safe leaching operations. Nitric acid solvents are used for leaching the uranium and/ or thorium from the sheared spent fuel elements, and the dissolved fuel is sent through a shielded pipeline to the extraction plant for further processing. Recommended materials of construction are 304L stainless steel and 3O9SCb stainless steel, and maintenance is by direct procedures. (auth)

McLain, H.A.

1959-07-23T23:59:59.000Z

85

Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10  

DOE Green Energy (OSTI)

Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

None

1977-01-01T23:59:59.000Z

86

Five-megawatt geothermal-power pilot-plant project  

DOE Green Energy (OSTI)

This is a report on the Raft River Geothermal-Power Pilot-Plant Project (Geothermal Plant), located near Malta, Idaho; the review took place between July 20 and July 27, 1979. The Geothermal Plant is part of the Department of Energy's (DOE) overall effort to help commercialize the operation of electric power plants using geothermal energy sources. Numerous reasons were found to commend management for its achievements on the project. Some of these are highlighted, including: (a) a well-qualified and professional management team; (b) effective cost control, performance, and project scheduling; and (c) an effective and efficient quality-assurance program. Problem areas delineated, along with recommendations for solution, include: (1) project planning; (2) facility design; (3) facility construction costs; (4) geothermal resource; (5) drilling program; (6) two facility construction safety hazards; and (7) health and safety program. Appendices include comments from the Assistant Secretary for Resource Applications, the Controller, and the Acting Deputy Director, Procurement and Contracts Management.

Not Available

1980-08-29T23:59:59.000Z

87

Experimental results: Pilot plant calcine dissolution and liquid feed stability  

Science Conference Proceedings (OSTI)

The dissolution of simulated Idaho Chemical Processing Plant pilot plant calcines, containing none of the radioactive actinides, lanthanides or fission products, was examined to evaluate the solubility of calcine matrix materials in acidic media. This study was a necessary precursor to dissolution and optimization experiments with actual radionuclide-containing calcines. The importance of temperature, nitric acid concentration, ratio of acid volume to calcine mass, and time on the amount, as a weight percentage of calcine dissolved, was evaluated. These parameters were studied for several representative pilot plant calcine types: (1) Run No. 74 Zirconia calcine; (2) Run No. 17 Zirconia/Sodium calcine; (3) Run No. 64 Zirconia/Sodium calcine; (3) Run No. 1027 Alumina calcine; and (4) Run No. 20 Alumina/Zirconia/Sodium calcine. Statistically designed experiments with the different pilot plant calcines indicated the effect of the studied process variables on the amount of calcine dissolved decreases in the order: Acid/Calcine Ratio > Temperature > HNO{sub 3} Concentration > Dissolution Time. The following conditions are suitable to achieve greater than 90 wt. % dissolution of most Zr, Al, or Na blend calcines: (1) Maximum nitric acid concentration of 5M; (2) Minimum acid/calcine ratio of 10 mL acid/1 gram calcine; (3) Minimum dissolution temperature of 90{degrees}C; and (4) Minimum dissolution time of 30 minutes. The formation of calcium sulphate (CaSO{sub 4}) precipitates was observed in certain dissolved calcine solutions during the dissolution experiments. Consequently, a study was initiated to evaluate if and under what conditions the resulting dissolved calcine solutions would be unstable with regards to precipitate formation. The results indicate that precipitate formation in the calcine solutions prepared under the above proposed dissolution conditions are not anticipated.

Herbst, R.S.; Fryer, D.S.; Brewer, K.N.; Johnson, C.K.; Todd, T.A.

1995-02-01T23:59:59.000Z

88

Technical Proposal Salton Sea Geothermal Power Pilot Plant Program  

DOE Green Energy (OSTI)

The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in which developmental geothermal utilization concepts can be tested and evaluated. Program efforts will be divided into four sub-programs; Power Generation, Mineral Extraction, Reservoir Production, and the Area Resources Test Facility. The Power Generation Subprogram will include testing of scale and corrosion control methods, and critical power cycle components; power cycle selection based on an optimization of technical, environmental and economic analyses of candidate cycles; preliminary design of a pilot geothermal-electric generating station to be constructed in Phase 2 of this program. The Mineral Extraction Subprogram will involve the following: selection of an optimum mineral recovery process; recommendation of a brine clean-up process for well injection enhancement; engineering, construction and operation of mineral recovery and brine clean-up facilities; analysis of facility operating results from environmental, economical and technical point-of-view; preliminary design of mineral recovery and brine clean-up facilities of sufficient size to match the planned pilot power plant. The Reservoir Production Subprogram will include monitoring the operation and maintenance of brine production, handling and injection systems which were built with private funding in phase 0, and monitoring of the brine characteristics and potential subsidence effects during well production and injection. Based on the above, recommendations and specifications will be prepared for production and injection systems necessary to serve the pilot power and mineral recovery plants planned for Phase 3. The scope of the Area Resource Test Facility Subprogram will include evaluation, costing, design, construction and operation of an ARTF that can serve as a field facility for testing and evaluating high temperature, high salinity geothermal brine utilization components and systems being developed by various organizations and laboratories in the United States. [DJE-2005

None

1975-03-28T23:59:59.000Z

89

APS Alternative Fuel (Hydrogen) Pilot Plant - Monitoring System Report  

DOE Green Energy (OSTI)

The U.S. Department of Energys (DOEs) Advanced Vehicle Testing Activity (AVTA), along with Electric Transportation Applications and Arizona Pubic Service (APS), is monitoring the operations of the APS Alternative Fuel (Hydrogen) Pilot Plant to determine the costs to produce hydrogen fuels (including 100% hydrogen as well as hydrogen and compressed natural gas blends) for use by fleets and other operators of advanced-technology vehicles. The hydrogen fuel cost data will be used as benchmark data by technology modelers as well as research and development programs. The Pilot Plant can produce up to 18 kilograms (kg) of hydrogen per day by electrolysis. It can store up to 155 kg of hydrogen at various pressures up to 6,000 psi. The dispenser island can fuel vehicles with 100% hydrogen at 5,000 psi and with blends of hydrogen and compressed natural gas at 3,600 psi. The monitoring system was designed to track hydrogen delivery to each of the three storage areas and to monitor the use of electricity on all major equipment in the Pilot Plant, including the fuel dispenser island. In addition, water used for the electrolysis process is monitored to allow calculation of the total cost of plant operations and plant efficiencies. The monitoring system at the Pilot Plant will include about 100 sensors when complete (50 are installed to date), allowing for analysis of component, subsystems, and plant-level costs. The monitoring software is mostly off-the-shelve, with a custom interface. The majority of the sensors input to the Programmable Automation Controller as 4- to 20-mA analog signals. The plant can be monitored over of the Internet, but the control functions are restricted to the control room equipment. Using the APS general service plan E32 electric rate of 2.105 cents per kWh, during a recent eight-month period when 1,200 kg of hydrogen was produced and the plant capacity factor was 26%, the electricity cost to produce one kg of hydrogen was $3.43. However, the plant capacity factor has been increasing, with a recent one-month high of 49%. If a plant capacity factor of 70% can be achieved with the present equipment, the cost of electricity would drop to $2.39 per kg of hydrogen. In this report, the power conversion (76.7%), cell stack (53.1%), and reverse osmosis system (7.14%) efficiencies are also calculated, as is the water cost per kg of hydrogen produced ($0.10 per kg). The monitoring system has identified several areas having the potential to lower costs, including using an reverse osmosis system with a higher efficiency, improving the electrolysis power conversion efficiency, and using air cooling to replace some or all chiller cooling. These activities are managed by the Idaho National Laboratory for the AVTA, which is part of DOEs FreedomCAR and Vehicle Technologies Program.

James Francfort; Dimitri Hochard

2005-07-01T23:59:59.000Z

90

Waste Isolation Pilot Plant CY 2000 Site Environmental Report  

SciTech Connect

The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no evidence was found of any adverse effects from WIPP on the surrounding environment.

Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

2001-12-31T23:59:59.000Z

91

Waste Isolation Pilot Plant 2001 Site Environmental Report  

Science Conference Proceedings (OSTI)

The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment.

Westinghouse TRU Solutions, Inc.

2002-09-20T23:59:59.000Z

92

Waste Isolation Pilot Plant Biennial Environmental Compliance Report  

SciTech Connect

This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

Washington Regulatory and Environmental Services (WRES)

2004-10-25T23:59:59.000Z

93

High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test  

SciTech Connect

About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

Richard D. Boardman; B. H. O& #39; Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

2004-02-01T23:59:59.000Z

94

Waste Isolation Pilot Plant Annual Site Environmental Report for 2012  

SciTech Connect

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2012 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year; Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS).

None

2013-09-01T23:59:59.000Z

95

Decontamination and decommissioning of a fuel reprocessing pilot plant  

Science Conference Proceedings (OSTI)

SYNOPSIS The strontium Semiworks Pilot Fuel Reprocessing Plant at the Hanford Site in Washington State was decommissioned by a combination of dismantlement and entombment. The facility contained 9600 Ci of Sr-90 and 10 Ci of plutonium. Process cells were entombed in place. The above-grade portion of one cell with 1.5-m- (5-ft-) thick walls and ceilings was demolished by means of expanding grout. A contaminated stack was remotely sandblasted and felled by explosives. The entombed structures were covered with a 4.6-m- (15-ft-) thick engineered earthen barrier. 5 figs., 2 tabs.

Heine, W.F.; Speer, D.R.

1988-01-01T23:59:59.000Z

96

PROCESS DEVELOPMENT QUARTERLY REPORT. II. PILOT PLANT WORK  

DOE Green Energy (OSTI)

Progress is reported on the gross solubility of U in digestions of Mallinokrodt feed materials, studies of variables affecting U purity in a TBP hexane extraction cycle, low-acid flowsheet for TBP--hexane extraction process based on a 440 g U/liter in lM HNO/sub 3/ digest liquor, hacking studies in the pilot plant pumperdecanter system, recovery of U from residues from the dingot process, lowering the H level in dingot metal, forging of dingot bar stock, dingot extrusion, fubrication of UO/sub 2/ fuel elements, and the determination of H content of derby and ingot metal. (W.L.H.)

Kuhlman, N. ed.

1957-05-01T23:59:59.000Z

97

Waste Isolation Pilot Plant Land Management Plan DOE/WIPP-93...  

NLE Websites -- All DOE Office Websites (Extended Search)

with WIPP facility maintenance protocol) (see Waste Isolation Pilot Plant Land Management Plan DOEWIPP-93-004 64 Chapter 13, Maintenance and Work Control) to the road in...

98

Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report  

DOE Green Energy (OSTI)

Hydrogen has promise to be the fuel of the future. Its use as a chemical reagent and as a rocket propellant has grown to over eight million metric tons per year in the United States. Although use of hydrogen is abundant, it has not been used extensively as a transportation fuel. To assess the viability of hydrogen as a transportation fuel and the viability of producing hydrogen using off-peak electric energy, Pinnacle West Capital Corporation (PNW) and its electric utility subsidiary, Arizona Public Service (APS) designed, constructed, and operates a hydrogen and compressed natural gas fueling stationthe APS Alternative Fuel Pilot Plant. This report summarizes the design of the APS Alternative Fuel Pilot Plant and presents lessons learned from its design and construction. Electric Transportation Applications prepared this report under contract to the U.S. Department of Energys Advanced Vehicle Testing Activity. The Idaho National Engineering and Environmental Laboratory manages these activities for the Advanced Vehicle Testing Activity.

James E. Francfort

2003-12-01T23:59:59.000Z

99

Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002  

Science Conference Proceedings (OSTI)

The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services

2003-09-17T23:59:59.000Z

100

Physical and numerical modeling of the external fluid mechanics of OTEC pilot plants  

E-Print Network (OSTI)

This study examined the near field external fluid mechanics of symmetrical OTEC pilot plant designs (20-80 MWe) under realistic deep water conditions. The objective was to assess the environmental impact of different plant ...

Singarella, Paul N.

1982-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Waste Isolation Pilot Plant, Former Construction Worker Screening Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Worker Screening Construction Worker Screening Projects Waste Isolation Pilot Plant, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

102

Waste Isolation Pilot Plant Electronic FOIA Request Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Request (FOIA) Request (FOIA) Waste Isolation Pilot Plant Electronic FOIA Request Form To make an Electronic FOIA request, please provide the information below. Failure to enter accurate and complete information may render your FOIA request impossible to fulfill. Requests submitted under the Privacy Act must be signed and, therefore, cannot be submitted on this form. Name: Organization: Address: Phone: FAX: Email: Reasonable Describe Records Describe the specific record(s) you seek with sufficient detail that a knowledgeable official of the activity may locate the record with a reasonable amount of effort. Such detail should include: dates, titles, file designations, and offices to be searched. Since most DOE records are not retained permanently, the more information that

103

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect

U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

Washington TRU Solutions

2002-09-24T23:59:59.000Z

104

Final environmental impact statement. Waste Isolation Pilot Plant  

SciTech Connect

This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

Not Available

1980-10-01T23:59:59.000Z

105

Waste Isolation Pilot Plant Biennial Environmental Compliance Report  

Science Conference Proceedings (OSTI)

This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final decision by the New Mexico Environment Department (NMED), all alleged violations have been resolved without the assessment of fines or penalties. Non-mixed TRU waste shipments began on March 26, 1999. Shipments continued through November 26, 1999, the effective date of the Waste Isolation Pilot Plant Hazardous Waste Facility Permit (NM4890139088-TSDF). No shipments regulated under the Hazardous Waste Facility Permit were received at WIPP during this BECR reporting period.

Westinghouse TRU Solutions

2000-12-01T23:59:59.000Z

106

Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plant, National Transuranic Program Have Plant, National Transuranic Program Have Banner Year in 2013 Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year in 2013 December 24, 2013 - 12:00pm Addthis Since WIPP became operational in March 1999, it has surpassed receiving 11,000 shipments, which traveled over 14 million safe loaded miles over the nation’s highways through WIPP’s transportation program — equal to about 29 trips around the moon. WIPP has permanently disposed of more than 89,000 cubic meters of TRU waste — enough to fill more than 35 Olympic-size swimming pools. In 2013, WIPP is on course in support of the Los Alamos National Laboratory framework agreement with the State of New Mexico for complete removal of the above ground TRU waste stored at Area G by June 30, 2014. WIPP has cleaned 22 sites of legacy TRU waste.

107

A Pilot Plant: The Fastest Path to Commercial Fusion Energy  

SciTech Connect

Considerable effort has been dedicated to determining the possible properties of a magneticconfinement fusion power plant, particularly in the U.S.1, Europe2 and Japan3. There has also been some effort to detail the development path to fusion energy, particularly in the U.S.4 Only limited attention has been given, in Japan5 and in China6, to the options for a specific device to form the bridge from the International Thermonuclear Experimental Reactor, ITER, to commercial fusion energy. Nor has much attention been paid, since 2003, to the synergies between magnetic and inertial fusion energy development. Here we consider, at a very high level, the possibility of a Qeng ? 1 Pilot Plant, with linear dimensions ~ 2/3 the linear dimensions of a commercial fusion power plant, as the needed bridge. As we examine the R&D needs for such a system we find significant synergies between the needs for the development of magnetic and inertial fusion energy.

Robert J. Goldston

2010-03-03T23:59:59.000Z

108

TF Inner Leg Space Allocation for Pilot Plant Design Studies  

SciTech Connect

A critical design feature of any tokamak is the space taken up by the inner leg of the toroidal field (TF) coil. The radial build needed for the TF inner leg, along with shield thickness , size of the central solenoid and plasma minor radius set the major radius of the machine. The cost of the tokamak core roughly scales with the cube of the major radius. Small reductions in the TF build can have a big impact on the overall cost of the reactor. The cross section of the TF inner leg must structurally support the centering force and that portion of the vertical separating force that is not supported by the outer structures. In this paper, the TF inner leg equatorial plane cross sections are considered. Out-of- Plane (OOP) forces must also be supported, but these are largest away from the equatorial plane, in the inner upper and lower corners and outboard sections of the TF coil. OOP forces are taken by structures that are not closely coupled with the radial build of the central column at the equatorial plane. The "Vertical Access AT Pilot Plant" currently under consideration at PPPL is used as a starting point for the structural, field and current requirements. Other TF structural concepts are considered. Most are drawn from existing designs such as ITER's circular conduits in radial plates bearing on a heavy nose section, and TPX's square conduits in a case, Each of these concepts can rely on full wedging, or partial wedging. Vaulted TF coils are considered as are those with some component of bucking against a central solenoid or bucking post. With the expectation that the pilot plant will be a steady state machine, a static stress criteria is used for all the concepts. The coils are assumed to be superconducting, with the superconductor not contributing to the structural strength. Limit analysis is employed to assess the degree of conservatism in the static criteria as it is applied to a linear elastic stress analysis. TF concepts, and in particular the PPPL AT PILOT plate concept are evaluated based on amount of space needed for structure and the amount of space left for superconductor.

Peter H. Titus and Ali Zolfaghari

2012-09-06T23:59:59.000Z

109

10 MWe Solar Thermal Central Receiver Pilot Plant maintenance experience, January 1982-March 1983  

DOE Green Energy (OSTI)

This report presents a description of the maintenance experience at the 10 MWe Solar Thermal Central Receiver Pilot Plant near Barstow, California, during the period January 1982 through March 1983. The plant systems are briefly described, and statistical data on maintenance orders, labor requirements, and maintenance costs are presented. The data presented have been extracted from Southern California Edison historical maintenance records accumulated at the plant. Pilot plant systems requiring the most maintenance activity are identified so that efforts to reduce plant maintenance costs can be properly identified. The information is analyzed for the purpose of developing a data base for general use during the economic assessment, design, and staff planning of future solar central receiver plants. However, data presented here from the Pilot Plant should not be used for direct scaling of larger power production plants. The number and size of equipment items for larger plants will not scale, the designs will vary, and the Pilot Plant includes special testing and evaluation equipment which would not be necessary in plants built for the sole purpose of power production. Data taken at the Pilot Plant during the early plant startup and operational phase shows an annual maintenance cost of approximately one perent of the recurring plant capital cost. Similar costs for recent technology steam electric generating plants are estimated to range from 1.5 to 3%. The Pilot Plant maintenance cost will not appear as favorable if based on energy produced during power production due to the small plant size and equipment intensive nature of the plant. The solar-unique systems of the plant required 45% of the total plant maintenance labor and 39% of the total maintenance cost, both percentages being lower than anticipated.

Smith, J.W.

1985-05-01T23:59:59.000Z

110

Biochemical Conversion Pilot Plant (Fact Sheet), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

Biochemical Conversion Biochemical Conversion Pilot Plant A pilot-scale conversion plant for researchers, industry partners, and stakeholders to test a variety of biochemical conversion processes and technologies. NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. In the biochemical conversion pilot plant, NREL's engineers and scientists focus on all aspects of the efficiency and cost reduction of biochemical conversion processes. Our capabilities accommodate research from bench-scale to pilot-scale (up to one ton per day). NREL's biochemical conversion pilot plant is located in the Integrated Biorefinery Research Facility (IBRF). Photo by Dennis Schroeder, NREL/PIX 20248

111

Process performance of Ahlstrom Pyroflow PCFB pilot plant  

Science Conference Proceedings (OSTI)

Ahlstrom Pyropower has designed and built a 10 MW[sub th] (34 MMBtu) pressurized circulating fluidized bed (PCFB) pilot plant in Karhula, Finland. The unit is now operating. Data from this unit supports the design of a nominal 80 MW, Des Moines Energy Center 1 (DMEC-1) PCFB Repowering Project. The pilot plant PCFB combustor is of square cross-section. It is housed in a 3.6 m (11.8 ft) diameter pressure vessel. A high pressure high temperature gas cleaning unit downstream of the PCFB exhaust is installed in a separate 2.6 m (8.5 ft) diameter pressure vessel. The maximum plant operating pressure is 16 bar (232 psia). The fuel is fed in slurry form; sorbent is also fed along with the fuel. The net heat input per unit cross section of the combustor is the highest of any known combustion mode. The heat release can go up to 40 MW/m[sup 2] (12.6 MMBtu/ft[sup 2] hr). Many types of coals including high sulfur, bituminous Illinois No. 6 coal and Western sub bituminous, low sulfur Powder River Basin coal were tested. Combustion efficiencies in the range of 99.5 to 99.9% have been consistently observed. Emissions of various gases such as NO[sub x] SO[sub 2] and CO at different operating pressures and loads were monitored. The gas emissions have been lower than expected based on atmospheric circulating fluidized bed boiler experience. The sulfur retention is over 95 % with a Ca/S molar ratio of 1 to 2 for high sulfur Illinois No.6 coal. A GAVS molar ratio of 2.5 to 3.5 was observed to retain 95 % of sulfur with low sulfur Powder River Basin coal. All gaseous emissions during testing with Illinois No. 6 coal and Powder River Basin coal are well within the projected limits for the DMEC1 project. Emission data from tests with Illinois No. 6 coal and Powder River Basin coal are presented in the paper.

Sellakumar, K.M. (R D Center, Ahlstrom Pyropower, Inc., San Diego, CA (United States)); Isaksson, J.; Tiensuu, J. (Ahlstroem Pyropower, Inc., Karhula (Finland). Hans Ahlstroem Lab.)

1993-05-01T23:59:59.000Z

112

Process performance of Ahlstrom Pyroflow PCFB pilot plant  

Science Conference Proceedings (OSTI)

Ahlstrom Pyropower has designed and built a 10 MW{sub th} (34 MMBtu) pressurized circulating fluidized bed (PCFB) pilot plant in Karhula, Finland. The unit is now operating. Data from this unit supports the design of a nominal 80 MW, Des Moines Energy Center 1 (DMEC-1) PCFB Repowering Project. The pilot plant PCFB combustor is of square cross-section. It is housed in a 3.6 m (11.8 ft) diameter pressure vessel. A high pressure high temperature gas cleaning unit downstream of the PCFB exhaust is installed in a separate 2.6 m (8.5 ft) diameter pressure vessel. The maximum plant operating pressure is 16 bar (232 psia). The fuel is fed in slurry form; sorbent is also fed along with the fuel. The net heat input per unit cross section of the combustor is the highest of any known combustion mode. The heat release can go up to 40 MW/m{sup 2} (12.6 MMBtu/ft{sup 2} hr). Many types of coals including high sulfur, bituminous Illinois No. 6 coal and Western sub bituminous, low sulfur Powder River Basin coal were tested. Combustion efficiencies in the range of 99.5 to 99.9% have been consistently observed. Emissions of various gases such as NO{sub x} SO{sub 2} and CO at different operating pressures and loads were monitored. The gas emissions have been lower than expected based on atmospheric circulating fluidized bed boiler experience. The sulfur retention is over 95 % with a Ca/S molar ratio of 1 to 2 for high sulfur Illinois No.6 coal. A GAVS molar ratio of 2.5 to 3.5 was observed to retain 95 % of sulfur with low sulfur Powder River Basin coal. All gaseous emissions during testing with Illinois No. 6 coal and Powder River Basin coal are well within the projected limits for the DMEC1 project. Emission data from tests with Illinois No. 6 coal and Powder River Basin coal are presented in the paper.

Sellakumar, K.M. [R& D Center, Ahlstrom Pyropower, Inc., San Diego, CA (United States); Isaksson, J.; Tiensuu, J. [Ahlstroem Pyropower, Inc., Karhula (Finland). Hans Ahlstroem Lab.

1993-05-01T23:59:59.000Z

113

PROCESS DEVELOPMENT QUARTERLY REPORT. PART II. PILOT PLANT WORK  

DOE Green Energy (OSTI)

ABS>The stoicbiometric HNO/sub 3/ concentrations required to digest feed materials to 200g U/I, 3N excess acid are tabulated. Stoichiometrically the minimum HNO/sub 3/ concentration required to dissolve feed materials to flowsheet conditions flowsheet tests is presented. The sensitivity of the Weldon Spring TBP-extraction system to process flow rates is discussed. A series of pilot plant experiments are deserined for removing TBP from raffinate. Steam distillstion of the raffinate slurries proved to be more effective than washing with hexone in a pulse column. The flame fusion melting of UO/sub 2/ to form dense rods of relatively constant cross section continued. The rods and tubes which were extruded from micronized UO/sub 2/ had excellent surface quality and sintered densities greater than 98% of theoretical. Bomb center temperatures of 500 deg F and higher prior to fining, obtained by increasing the firing time, tended to produce low hydrogen U. A method for producing dingot U with an acceptable H/sub 2/ contact was developed. A number of solid additions to the UF/ sub 4/-Mg bomb charge were investigated. The tonnage of forged bar stock produced during this period is given. The variables affeeting diagot extrusion are discussed. An investigation of the dingot process is given. The determination of plant decontamination faetors for Ce/sup 3+/, Mg, and Al are presented. (W.L.H.)

Elliott, B. ed.

1957-08-01T23:59:59.000Z

114

DOE/WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP-10-2225 WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 Errata U.S. Department of Energy September 2010 2 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 DOE/WIPP-10-2225 3 2009 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2009 presents summary environmental data to (1) characterize site environmental management performance, (2) summarize environmental occurrences and responses reported during the calendar year, (3) confirm compliance with environmental standards and requirements, and (4) highlight the WIPP Environmental Management System (EMS), significant environmental programs, and accomplishments including progress toward the

115

Central receiver solar thermal power system, Phase 1. Pilot plant cost and commercial plant cost and performance preliminary design report. [150 MW commercial tower focus plant and 10 MW pilot plant  

DOE Green Energy (OSTI)

Detailed cost and performance data for the 10 MWe Pilot Plant and the 150 MWe Commercial Plant are given. The Commercial Plant consists of 15 integrated collector - receiver modules. Each module contains 1325 heliostats and an internally mounted steam-generating receiver on a steel tower with an aperture height of 90 M. The Pilot Plant consists of one full-scale collector - receiver module. The two-stage sensible heat storage system utilizes a heat transfer salt medium and a hydrocarbon oil storage medium. The electric power generation system uses a conventional steam turbine-generator. The Pilot Plant is one module of the Commercial Plant, providing for one-to-one scaling in the most critical areas. (WHK)

None

1977-01-01T23:59:59.000Z

116

Waste Isolation Pilot Plant Annual Site Enviromental Report for 2008  

SciTech Connect

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2008 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to characterize site environmental management performance; summarize environmental occurrences and responses reported during the calendar year; confirm compliance with environmental standards and requirements; highlight significant facility programs and efforts; and describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED). The WIPP mission is to safely dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States. In 2008, 5,265 cubic meters (m3) of TRU waste were disposed of at the WIPP facility, including 5,216 m3 of contact-handled (CH) TRU waste and 49 m3 of remote-handled (RH) TRU waste. From the first receipt of waste in March 1999 through the end of 2008, 57,873 m3 of TRU waste had been disposed of at the WIPP facility.

Washington Regulatory and Enviromnetal Services

2009-09-21T23:59:59.000Z

117

Experimental program plan for the Waste Isolation Pilot Plant  

SciTech Connect

The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

Not Available

1994-01-01T23:59:59.000Z

118

Waset Isolation Pilot Plant Annual Site Environmental Report for 2006  

Science Conference Proceedings (OSTI)

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2006 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that: (a) Characterize site environmental management performance; (b) Summarize environmental occurrences and responses reported during the calendar year; (c) Confirm compliance with environmental standards and requirements; and (d) Highlight significant facility programs and efforts. The DOE Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) maintain and preserve the environmental resources at the WIPP site. DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This report was prepared in accordance with DOE Order 231.1A. This order requires that DOE facilities submit an ASER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) (No. NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2007-09-26T23:59:59.000Z

119

Waste Isolation Pilot Plant Annual Site Environmental Report for 2010  

Science Conference Proceedings (OSTI)

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

None

2011-09-01T23:59:59.000Z

120

Waste Isolation Pilot Plant Biennial Environmental Compliance Report  

Science Conference Proceedings (OSTI)

This Biennial Environmental Compliance Report (BECR) documents compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste. This BECR covers the reporting period from April 1, 2004, to March 31, 2006. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents United States (U.S.) Department of Energy (DOE) compliance with regulations and permits issued pursuant to the following: (1) Title 40 Code of Federal Regulations (CFR) Part 191, Subpart A, "Environmental Standards for Management and Storage"; (2) Clean Air Act (CAA) (42 United States Code [U.S.C.] 7401, et seq.); (3) Solid Waste Disposal Act (SWDA) (42 U.S.C. 6901-6992, et seq.); (4) Safe Drinking Water Act (SDWA) (42 U.S.C. 300f, et seq.); (5) Toxic Substances Control Act (TSCA) (15 U.S.C. 2601, et seq.); (6) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. 9601, et seq.); and all other federal and state of New Mexico laws pertaining to public health and safety or the environment.

Washington Regulatory and Environmental Services

2006-10-12T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Compliance status report for the Waste Isolation Pilot Plant  

SciTech Connect

The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

Not Available

1994-03-31T23:59:59.000Z

122

Installation of the Pulse-Plate Column Pilot Plant  

Science Conference Proceedings (OSTI)

There are three primary types of solvent extraction equipment utilized in the nuclear industry for reprocessing of used nuclear fuel; pulse columns, mixer-settlers, and centrifugal contactors. Considerable research and development has been performed at the INL and throughout the DOE complex on the application of centrifugal contactors for used fuel reprocessing and these contactors offer many significant advantages. However, pulse columns have been used extensively in the past in throughout the world for aqueous separations processes and remain the preferred equipment by many commercial entities. Therefore, a pulse-plate column pilot plant has been assembled as part of the Advanced Fuel Cycle Initiative to support experimentation and demonstration of pulse column operation. This will allow the training of personnel in the operation of pulse columns. Also, this capability will provide the equipment to allow for research to be conducted in the operation of pulse columns with advanced solvents and processes developed as part of the fuel cycle research and development being performed in the AFCI program.

Nick R. Mann

2009-07-01T23:59:59.000Z

123

DOE/WIPP-11-2225 Waste Isolation Pilot Plant Annual Site Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

11-2225 11-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 U.S. Department of Energy September 2011 Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 DOE/WIPP-11-2225 2 This page intentionally left blank Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 DOE/WIPP-11-2225 3 2010 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 presents summary environmental data to (1) characterize site environmental management performance, (2) summarize environmental occurrences and responses reported during the calendar year, (3) confirm compliance with environmental standards and requirements, and (4) highlight the WIPP Environmental

124

EA-1642S: Small-Scale Pilot Plant for the Gasification of Coal and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

642S: Small-Scale Pilot Plant for the Gasification of Coal and 642S: Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, KY EA-1642S: Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, KY SUMMARY This draft Supplemental Environmental Assessment (SEA) analyzes the potential environmental impacts of DOE's proposed action of providing cost-shared funding for the University of Kentucky (UK) Center for Applied Energy Research (CAER) Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis project and of the No-Action Alternative.

125

Planned Characterization CapabilityAt The Waste Isolation Pilot Plant, IG-0577  

Energy.gov (U.S. Department of Energy (DOE))

The Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, is the Department of Energy's underground repository for defense-generated Transuranic (TRU) waste. TRU waste consists of...

126

EA-1642S: Small-Scale Pilot Plant for the Gasification of Coal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

642S: Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, KY...

127

Simulation of logistics systems: simulation model for shipment of waste to the waste isolation pilot plant  

Science Conference Proceedings (OSTI)

The United States Department of Energy has agreed to ship 15,000 drums of cold war legacy waste from the Idaho National Engineering and Environmental Laboratory (INEEL) to the Waste Isolation Pilot Plant (WIPP). This waste must undergo characterization ...

Cathy J. Barnard; David H. Van Haaften

2000-12-01T23:59:59.000Z

128

Strategic Plan for Groundwater Monitoring at the Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP-03-3230 WIPP-03-3230 Strategic Plan for Groundwater Monitoring at the Waste Isolation Pilot Plant February 2003 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 03-3230 ii DOE/WIPP 03-3230 iii Table of Contents EXECUTIVE SUMMARY ....................................................................................... viii 1. Introduction.................................................................................................... 1 1.1 Overview .................................................................................................. 1 1.2 Historical Perspective .............................................................................. 1 1.2.1 Evolution of the Groundwater-Monitoring Well Network

129

Central receiver solar thermal power system, Phase 1. CDRL Item 2. Pilot plant preliminary design report. Volume IV. Receiver subsystem. [10-MW Pilot Plant and 100-MW Commercial Plant  

DOE Green Energy (OSTI)

The conception, design, and testing of the receiver subsystem proposed by the McDonnell Douglas/Rocketdyne Receiver team for the DOE 10-MW Pilot Plant and the 100-MW Commercial Plant are described. The receiver subsystem consists of the receiver unit, the tower on which the receiver unit is mounted above the collector field, and the supporting control and instrumentation equipment. The plans for implementation of the Pilot Plant are given including the anticipated schedule and production plan (procurement, installation, checkout, and maintenance). Specifications for the performance, design, and test requirements for the Pilot Plant receiver subsystem are included. (WHK)

Hallet, Jr., R. W.; Gervais, R. L.

1977-11-01T23:59:59.000Z

130

Final Report: RPP-WTP Semi-Integrated Pilot Plant  

Science Conference Proceedings (OSTI)

In August 2004 the last of the SIPP task testing ended--a task that formally began with the issuance of the RPP-WTP Test Specification in June 2003. The planning for the task was a major effort in itself and culminated with the input of all stakeholders, DOE, Bechtel National, Inc., Washington Group International, in October 2003 at Hanford, WA (Appendix A). This report documents the activities carried out as a result of that planning. Campaign IV, the fourth and final step towards the Semi-Integrated Pilot Plant (SIPP) task, conducted by the Savannah River National Laboratory (SRNL) at the Savannah River Site, was to take the several recycle streams produced in Campaign III, the third step of the task, and combine them with other simulated recycle and chosen waste streams. (Campaign III was fed recycles from Campaign II, as Campaign II was fed by Campaign I.) The combined stream was processed in a fashion that mimicked the pretreatment operations of the DOE River Protection Project--Waste Treatment and Immobilization Plant (RPP-WTP) with the exception of the Ion Exchange Process. The SIPP task is considered semi-integrated because it only deals with the pretreatment operations of the RPP-WTP. That is, the pilot plant starts by receiving waste from the tank farm and ends when waste is processed to the point of being sent for vitrification. The resulting pretreated LAW and HLW simulants produced by the SIPP were shipped to VSL (Vitreous State Laboratory) and successfully vitrified in pilot WTP melters. Within the SIPP task these steps are referred to as Campaigns and there were four Campaigns in all. Campaign I, which is completely different than other campaigns, subjected a simulant of Hanford Tank 241-AY-102/C-106 (AY102) waste to cross-flow ultrafiltration only and in that process several important recycle streams were produced as a result of washing the simulant and cleaning the cross-flow filter. These streams were fed to subsequent campaigns and that work was the subject of the issued Campaign I interim report (Duignan et al., 2004a or Appendix I-1). The streams created in Campaign I were used for Campaign II, and during Campaign II more of the same recycle streams were produced, with the addition of recycle streams created during the pilot-scale ion exchange unit operation (Duignan et al., 2004b or Appendix I-2). Campaign III used the recycles from Campaign II and was the first campaign to use all the recycle streams (Duignan et al., 2004c or Appendix I-3). The operation of each of the subsequent campaigns, i.e., II, III, and IV, while different from Campaign I, are very similar to each other, and can be best understood as the process of operating a series of Pretreatment Unit Operations in a somewhat prototypic manner. That is, while Campaign I studied the operation of a single, albeit important, Pretreatment Unit Operation, i.e., Ultrafiltration, subsequent campaigns were to study the four major unit operations that make-up the RPP-WTP Pretreatment Facility. They are: Waste Feed Evaporation Process (FEP), Ultrafiltration Process (UFP), Cesium Ion Exchange Process (CIX), and the Treated LAW Evaporation Process (TLP). Each of the campaigns operated basically as a separate subtask, but as with Campaign I, the recycle streams produced in one campaign were fed into the subsequent campaign. Therefore, all four campaigns were chemically connected through these recycle streams, which carry over effects of the preceding campaign. The results of Campaign IV operations are the subject of this fourth and final report. Separate reports were issued after each of the previous campaigns, but they were treated as interim because of being limited to the results obtained from a single campaign (or past campaigns) and further limited to only highlights of that single campaign. This final report not only discusses the Campaign IV results but compares those with the previous campaigns. Also included is a more comprehensive discussion of the overall task activities, as well as abridged versions of the full databases of the accumulated

Duignan, M. R.; Adamson, D. J.; Calloway, T. B.; Fowley, M. D.; Qureshi, Z. H.; Steimke, J. L.; Williams, M. R.; Zamecnik, J. R.

2005-06-01T23:59:59.000Z

131

Final Report: RPP-WTP Semi-Integrated Pilot Plant  

SciTech Connect

In August 2004 the last of the SIPP task testing ended--a task that formally began with the issuance of the RPP-WTP Test Specification in June 2003. The planning for the task was a major effort in itself and culminated with the input of all stakeholders, DOE, Bechtel National, Inc., Washington Group International, in October 2003 at Hanford, WA (Appendix A). This report documents the activities carried out as a result of that planning. Campaign IV, the fourth and final step towards the Semi-Integrated Pilot Plant (SIPP) task, conducted by the Savannah River National Laboratory (SRNL) at the Savannah River Site, was to take the several recycle streams produced in Campaign III, the third step of the task, and combine them with other simulated recycle and chosen waste streams. (Campaign III was fed recycles from Campaign II, as Campaign II was fed by Campaign I.) The combined stream was processed in a fashion that mimicked the pretreatment operations of the DOE River Protection Project--Waste Treatment and Immobilization Plant (RPP-WTP) with the exception of the Ion Exchange Process. The SIPP task is considered semi-integrated because it only deals with the pretreatment operations of the RPP-WTP. That is, the pilot plant starts by receiving waste from the tank farm and ends when waste is processed to the point of being sent for vitrification. The resulting pretreated LAW and HLW simulants produced by the SIPP were shipped to VSL (Vitreous State Laboratory) and successfully vitrified in pilot WTP melters. Within the SIPP task these steps are referred to as Campaigns and there were four Campaigns in all. Campaign I, which is completely different than other campaigns, subjected a simulant of Hanford Tank 241-AY-102/C-106 (AY102) waste to cross-flow ultrafiltration only and in that process several important recycle streams were produced as a result of washing the simulant and cleaning the cross-flow filter. These streams were fed to subsequent campaigns and that work was the subject of the issued Campaign I interim report (Duignan et al., 2004a or Appendix I-1). The streams created in Campaign I were used for Campaign II, and during Campaign II more of the same recycle streams were produced, with the addition of recycle streams created during the pilot-scale ion exchange unit operation (Duignan et al., 2004b or Appendix I-2). Campaign III used the recycles from Campaign II and was the first campaign to use all the recycle streams (Duignan et al., 2004c or Appendix I-3). The operation of each of the subsequent campaigns, i.e., II, III, and IV, while different from Campaign I, are very similar to each other, and can be best understood as the process of operating a series of Pretreatment Unit Operations in a somewhat prototypic manner. That is, while Campaign I studied the operation of a single, albeit important, Pretreatment Unit Operation, i.e., Ultrafiltration, subsequent campaigns were to study the four major unit operations that make-up the RPP-WTP Pretreatment Facility. They are: Waste Feed Evaporation Process (FEP), Ultrafiltration Process (UFP), Cesium Ion Exchange Process (CIX), and the Treated LAW Evaporation Process (TLP). Each of the campaigns operated basically as a separate subtask, but as with Campaign I, the recycle streams produced in one campaign were fed into the subsequent campaign. Therefore, all four campaigns were chemically connected through these recycle streams, which carry over effects of the preceding campaign. The results of Campaign IV operations are the subject of this fourth and final report. Separate reports were issued after each of the previous campaigns, but they were treated as interim because of being limited to the results obtained from a single campaign (or past campaigns) and further limited to only highlights of that single campaign. This final report not only discusses the Campaign IV results but compares those with the previous campaigns. Also included is a more comprehensive discussion of the overall task activities, as well as abridged versions of the full databases of the accumulated

Duignan, M. R.; Adamson, D. J.; Calloway, T. B.; Fowley, M. D.; Qureshi, Z. H.; Steimke, J. L.; Williams, M. R.; Zamecnik, J. R.

2005-06-01T23:59:59.000Z

132

MHK Technologies/Uldolmok Pilot Tidal Current Power Plant | Open Energy  

Open Energy Info (EERE)

Uldolmok Pilot Tidal Current Power Plant Uldolmok Pilot Tidal Current Power Plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Uldolmok Pilot Tidal Current Power Plant.jpg Technology Profile Primary Organization Korea East West Power Co LTD Technology Resource Click here Current Technology Type Click here Overtopping Technology Readiness Level Click here TRL 9 Commercial Scale Production Application Technology Description The tidal current power plant uses current energy that can be differentiated from a typical tidal power plant using marine energy The latter confines water in a dam and when released it gets processed in a turbine to produce electric power The tidal current power plant on the other hand does not need a dam thus concerns of social dislocations and degradation of ecosystems primarily endangering marine life can be avoided

133

The Scaleup of Structured Packing from Distillation Pilot Plant Testing to Commercial Application  

E-Print Network (OSTI)

Structured packing is being utilized more and more in the process industry for increased efficiency, greater capacity, and energy savings in distillation columns. Pilot plant testing of the actual chemical system using commercially available structured packing is invaluable, but years of experience in pilot plant testing have shown that scaleup to successful commercial designs is a complicated process. In this paper an actual case history is cited as an example of the problems and benefits of conducting pilot plant tests which set the commercial design bases for a distillation train. The actual pilot plant testing involved a different structured packing type and blocked out operations to simulate a large number of theoretical stages. The pilot plant results verified the thermodynamic data to a high confidence level. As a result, the initial commercial installation of structured packing was started immediately. The actual installation and the startup are covered with a discussion of the energy savings and quality improvement which were obtained by replacing trays with the packing. Another case of retrofit testing in the new Koch Development Pilot Plant is discussed indicating other areas for attention to detail.

Berven, O. J.; Ulowetz, M. A.

1986-06-01T23:59:59.000Z

134

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect

The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR 264.90 through 264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] 6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

Washington Regulatory and Environmental Services

2005-07-01T23:59:59.000Z

135

Waste Isolation Pilot Plant Biennial Environmental Compliance Report  

SciTech Connect

This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2000, to March 31, 2002. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Field Office's (CBFO) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. In the prior BECR, the CBFO and the management and operating contractor (MOC)committed to discuss resolution of a Letter of Violation that had been issued by the New Mexico Environment Department (NMED) in August 1999, which was during the previous BECR reporting period. This Letter of Violation alleged noncompliance with hazardous waste aisle spacing, labeling, a nd tank requirements. At the time of publication of the prior BECR, resolution of the Letter of Violation was pending. On July 7, 2000, the NMED issued a letter noting that the aisle spacing and labeling concerns had been adequately addressed and that they were rescinding the violation alleging that the Exhaust Shaft Catch Basin failed to comply with the requirements for a hazardous waste tank. During the current reporting period, WIPP received a Notice of Violation and a compliance order alleging the violation of the New Mexico Hazardous Waste Regulations and the WIPP Hazardous Waste Facility Permit (HWFP).

Washinton TRU Solutions LLC

2002-09-30T23:59:59.000Z

136

Final environmental impact statement. Waste Isolation Pilot Plant  

Science Conference Proceedings (OSTI)

In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

Not Available

1980-10-01T23:59:59.000Z

137

Alternative Fuel Pilot Plant & Hydrogen Internal Combustion Engine Vehicle Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

RESEARCH & DEVELOPMENT RESEARCH & DEVELOPMENT Science Arizona Public Service Alternative Fuel Pilot Plant & Hydrogen Internal Combustion Engine Vehicle Testing Alternative Fuel Pilot Plant The Arizona Public Service Alternative Fuel Pilot Plant is a model alternative fuel refueling system, dispensing hydrogen, compressed natural gas (CNG), and hydrogen/ CNG blends (HCNG). The plant is used daily to fuel vehicles operated in Arizona Public Service's fleet. Hydrogen Subsystem The plant's hydrogen system consists of production, compression, storage, and dispensing. The hydrogen produced is suitable for use in fuel cell-powered vehicles, for which the minimum hydrogen purity goal is 99.999%. Hydrogen is produced using an electrolysis process that separates water into hydrogen and oxygen. At present, the hydrogen is

138

Solar Pilot Plant: Phase I. Final report, July 1, 1975--July 1, 1977  

DOE Green Energy (OSTI)

Honeywell was given a 2-year contract by the Energy Research and Development Administration on 1 July 1975 to develop a preliminary design for a 10-MW(e) solar pilot plant of the central receiver type. The program culminated in mid-1977 with delivery of a pilot plant preliminary design, estimates for its cost, and performance, and cost estimates for a 100-MW(e) plant, which will be detailed during the operation of and built as a follow-on to the pilot plant. The pilot plant preliminary design evolved through three iterations, which were verified and refined by analysis and experimentation. Subsystem research experiments (SREs) were conducted on the collector subsystem and the steam generator portion of the receiver subsystem. A lesser amount of testing was done on a latent-heat storage subsystem before a sensible-heat storage subsystem was incorporated at the direction of ERDA. All test results and analyses pointed to the feasibility of the pilot plant, and by extension to commercial-scale plants. On that basis and in light of the worsening energy situation, Honeywell recommended that Phase II of the program be undertaken as quickly as practical.

None

1978-02-01T23:59:59.000Z

139

Peat-Gasification Pilot-Plant Program. Final report, April 9, 1980-March 31, 1983  

SciTech Connect

The objective of this program was twofold: (1) to modify an existing pilot plant and (2) to operate the pilot plant with peat to produce substitute natural gas (SNG). Activities included the design, procurement, and installation of peat drying, grinding, screening, and lockhopper feed systems. Equipment installed for the program complements the existing pilot plant facility. After shakedown of the new feed preparation equipment (drying, screening, and crushing) was successfully completed, the first integrated pilot plant test was conducted in April 1981 to provide solids flow data and operating experience with the new PEATGAS gasifier configuration. Three gasification tests were subsequently conducted using the existing slurry feed system. The lockhopper feed system, capable of providing a continuous, measured flow of 1 to 4 tons of dry feed at pressures up to 500 psig, was then successfully integrated with the gasifier. Two gasification tests were conducted, expanding the data to more economical operating conditions. The operation of the PEATGAS pilot plant has confirmed that peat is an excellent raw material for SNG production. Peat conversions over 90% were consistently achieved at moderate gasification temperatures and at sinter-free conditions. A large data base was established for Minnesota peat at pressure 1.0. The technical feasibility of the PEATGAS process has been successfully demonstrated. However, an economic assessment of the peat gasification process indicates that the cost of the peat feedstock delivered to a plant site has a significant effect on the cost of the product SNG. 28 figures, 36 tables.

Not Available

1983-03-01T23:59:59.000Z

140

Pilot plant test results and demonstration of the Ahlstrom Pyroflow pressurized CFB technology  

SciTech Connect

Ahlstrom Pyropower initiated development of PCFB technology in 1086 after a detailed analysis of competing advanced coal utilization technologies. A 10 MWth pilot plant was started up in 1989 and has produced very promising test results which are highly competitive with coal gasification. This led to a successful application for demonstration of the technology under round III of the DOE Clean Coal Technology Program. The resulting project is Iowa Power's DMEC-1 PCFB Repowering Project. The project is currently in the preliminary engineering phase with supporting pilot plant testing being performed in parallel. Successful demonstration of PCFB technology will provide utilities with a cost effective option for repowering older power stations to comply with the requirements of the 1990 Clean Air Act Amendment in the near term and a clean and high efficiency new plant option in the longer term. This paper will present recent pilot plant test results and review the major technical features of the DMEC-1 project.

Provol, S.J.; Dryden, R.J. (Pyropower Corp., San Diego, CA (United States))

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Pilot plant test results and demonstration of the Ahlstrom Pyroflow pressurized CFB technology  

Science Conference Proceedings (OSTI)

Ahlstrom Pyropower initiated development of PCFB technology in 1086 after a detailed analysis of competing advanced coal utilization technologies. A 10 MWth pilot plant was started up in 1989 and has produced very promising test results which are highly competitive with coal gasification. This led to a successful application for demonstration of the technology under round III of the DOE Clean Coal Technology Program. The resulting project is Iowa Power`s DMEC-1 PCFB Repowering Project. The project is currently in the preliminary engineering phase with supporting pilot plant testing being performed in parallel. Successful demonstration of PCFB technology will provide utilities with a cost effective option for repowering older power stations to comply with the requirements of the 1990 Clean Air Act Amendment in the near term and a clean and high efficiency new plant option in the longer term. This paper will present recent pilot plant test results and review the major technical features of the DMEC-1 project.

Provol, S.J.; Dryden, R.J. [Pyropower Corp., San Diego, CA (United States)

1992-11-01T23:59:59.000Z

142

10 MWe Solar Thermal Central Receiver Pilot Plant total capital cost  

DOE Green Energy (OSTI)

A detailed breakdown of the capital cost of the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, California is presented. The total capital requirements of the pilot plant are given in four cost breakdown structures: (1) project costs (research and development, design, factory, construction, and start-up); (2) plant system costs (land, structures and improvements, collector system, receiver system, thermal transport system, thermal storage system, turbine-generator plant system, electrical plant system, miscellaneous plant equipment, and plant level); (3) elements of work costs (sitework/earthwork, concrete work, metal work, architectural work, process equipment, piping and electrical work); and (4) recurring and non-recurring costs. For all four structures, the total capital cost is the same ($141,200,000); however, the allocation of costs within each structure is different. These cost breakdown structures have been correlated to show the interaction and the assignment of costs for specific areas.

Norris, H.F. Jr.

1985-02-01T23:59:59.000Z

143

SCALEUP OF ALUMINUM PHOSPHATE CATALYST FOR PILOT PLANT LPDMEtm RUN  

SciTech Connect

The Liquid Phase Dimethyl Ether (LPDME{trademark}) process converts synthesis gas to dimethyl ether in a single slurry bubble column reactor. A mixed slurry of methanol synthesis catalyst and methanol dehydration catalyst in a neutral mineral oil simultaneously synthesizes methanol from syngas and converts some of it to dimethyl ether and water. The reaction scheme is: 2H{sub 2} + CO = CH{sub 3}OH 2CH{sub 3}OH = CH{sub 3}OCH{sub 3} + H{sub 2}O H{sub 2}O + CO = CO{sub 2} + H{sub 2}. Most of the water produced in this reaction is converted to hydrogen by reduction with carbon monoxide (water gas shift reaction). This synergy permits higher per pass conversion than methanol synthesis alone. The enhancement in conversion occurs because dehydration of the methanol circumvents the equilibrium constraint of the syngas-to-methanol step. The slurry bubble column reactor provides the necessary heat transfer capacity to handle the greater heat duty associated with high conversion. In order to improve the stability of the catalyst system, non-stoichiometric aluminum phosphate was proposed as the dehydration catalyst for the LPDME{trademark} process. This aluminum phosphate material is a proprietary catalyst. This catalyst system of a standard methanol catalyst and the aluminum phosphate provided stable process performance that met the program targets under our standard test process conditions in the laboratory. These targets are (1) an initial methanol equivalent productivity of 28 gmol/kg/hr, (2) a CO{sub 2}-free, carbon selectivity of 80% to dimethyl ether and (3) stability of both catalysts equivalent to that of the methanol catalyst in the absence of the aluminum phosphate. A pilot plant trial of the LPDME{trademark} process using the aluminum phosphate catalyst was originally planned for March 1998 at the DOE-owned, Air Products (APCI)-operated facility at LaPorte, Texas. Because the aluminum phosphate catalyst is not commercially available, we initiated a scaleup project with a commercial catalyst vendor. A total of 800 pounds of aluminum phosphate catalyst was ordered to provide two reactor charges and some additional material for testing. Although the scaleup was never completed, the effort yielded valuable information about the nature of the catalyst and the nature of the LPDME{trademark} process. This information is documented in this topical report.

Andrew W. Wang

2002-05-15T23:59:59.000Z

144

SCALEUP OF ALUMINUM PHOSPHATE CATALYST FOR PILOT PLANT LPDMEtm RUN  

SciTech Connect

The Liquid Phase Dimethyl Ether (LPDME{trademark}) process converts synthesis gas to dimethyl ether in a single slurry bubble column reactor. A mixed slurry of methanol synthesis catalyst and methanol dehydration catalyst in a neutral mineral oil simultaneously synthesizes methanol from syngas and converts some of it to dimethyl ether and water. The reaction scheme is shown below: 2H{sub 2} + CO = CH{sub 3}OH; 2CH{sub 3}OH = CH{sub 3}OCH{sub 3} + H{sub 2}O; H{sub 2}O + CO = CO{sub 2} + H{sub 2}. Most of the water produced in this reaction is converted to hydrogen by reduction with carbon monoxide (water gas shift reaction). This synergy permits higher per pass conversion than methanol synthesis alone. The enhancement in conversion occurs because dehydration of the methanol circumvents the equilibrium constraint of the syngas-to-methanol step. The slurry bubble column reactor provides the necessary heat transfer capacity to handle the greater heat duty associated with high conversion. In order to improve the stability of the catalyst system, non-stoichiometric aluminum phosphate was proposed as the dehydration catalyst for the LPDME{trademark} process. This aluminum phosphate material is a proprietary catalyst. This catalyst system of a standard methanol catalyst and the aluminum phosphate provided stable process performance that met the program targets under our standard test process conditions in the laboratory. These targets are (1) an initial methanol equivalent productivity of 28 gmol/kg/hr, (2) a CO{sub 2}-free, carbon selectivity of 80% to dimethyl ether and (3) stability of both catalysts equivalent to that of the methanol catalyst in the absence of the aluminum phosphate. A pilot plant trial of the LPDME{trademark} process using the aluminum phosphate catalyst was originally planned for March 1998 at the DOE-owned, Air Products (APCI)-operated facility at LaPorte, Texas. Because the aluminum phosphate catalyst is not commercially available, we initiated a scaleup project with a commercial catalyst vendor. A total of 800 pounds of aluminum phosphate catalyst was ordered to provide two reactor charges and some additional material for testing. Although the scaleup was never completed, the effort yielded valuable information about the nature of the catalyst and the nature of the LPDME{trademark} process. This information is documented in this topical report.

Andrew W. Wang

2002-01-01T23:59:59.000Z

145

Arsenic pilot plant operation and results : Anthony, New Mexico.  

Science Conference Proceedings (OSTI)

Sandia National Laboratories (SNL) is conducting pilot scale evaluations of the performance and cost of innovative water treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The pilot tests have been conducted in New Mexico where over 90 sites that exceed the new MCL have been identified by the New Mexico Environment Department. The pilot test described in this report was conducted in Anthony, New Mexico between August 2005 and December 2006 at Desert Sands Mutual Domestic Water Consumers Association (MDWCA) (Desert Sands) Well No.3. The pilot demonstrations are a part of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The Sandia National Laboratories pilot demonstration at the Desert Sands site obtained arsenic removal performance data for fourteen different adsorptive media under intermittent flow conditions. Well water at Desert Sands has approximately 20 ppb arsenic in the unoxidized (arsenite-As(III)) redox state with moderately high total dissolved solids (TDS), mainly due to high sulfate, chloride, and varying concentrations of iron. The water is slightly alkaline with a pH near 8. The study provides estimates of the capacity (bed volumes until breakthrough at 10 ppb arsenic) of adsorptive media in the same chlorinated water. Adsorptive media were compared side-by-side in ambient pH water with intermittent flow operation. This pilot is broken down into four phases, which occurred sequentially, however the phases overlapped in most cases.

Aragon, Malynda Jo; Everett, Randy L.; Siegel, Malcolm Dean; Aragon, Alicia R.; Kottenstette, Richard Joseph; Holub, William E., Jr.; Wright, Jerome L.; Dwyer, Brian P.

2007-09-01T23:59:59.000Z

146

10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility  

DOE Green Energy (OSTI)

Testing plans for a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally, the design planned for the Barstow Solar Pilot Plant are presented. Testing is to include operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the panel's transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. Test hardware are described, including the pilot plant receiver, the test receiver assembly, receiver panel, flow control, electrical control and instrumentation, and structural assembly. Requirements for the Solar Thermal Test Facility for the tests are given. The safety of the system is briefly discussed, and procedures are described for assembly, installation, checkout, normal and abnormal operations, maintenance, removal and disposition. Also briefly discussed are quality assurance, contract responsibilities, and test documentation. (LEW)

Not Available

1978-08-25T23:59:59.000Z

147

Desulfurization of Fisher-Tropsch synthesis gas in coal-to-gasoline pilot plant  

SciTech Connect

In 1989, a coal-to-gasoline pilot plant was installed and operated successfully in China, and a dry desulfurization process was used in this plant. This paper presents an overview of the dry desulfurization process. It includes design and operation of the process, and a description of ST801, T305 adsorbents and TGH COS hydrolysis catalyst. In addition, the desulfurization process used in a planned demonstration plant scheduled for completion in 1991 is presented.

Shishao, T.; Ju, S.; Shenzhao, L.; Maoqian, M.; Hanxian, G. (Dept. of Chemical Engineering, Taiyuan Univ. of Technology, Taiyuan, Shanxi (CN))

1990-01-01T23:59:59.000Z

148

Raft River binary-cycle geothermal pilot power plant final report  

DOE Green Energy (OSTI)

The design and performance of a 5-MW(e) binary-cycle pilot power plant that used a moderate-temperature hydrothermal resource, with isobutane as a working fluid, are examined. Operating problems experienced and solutions found are discussed and recommendations are made for improvements to future power plant designs. The plant and individual systems are analyzed for design specification versus actual performance figures.

Bliem, C.J.; Walrath, L.F.

1983-04-01T23:59:59.000Z

149

Waste Isolation Pilot Plant Medical Screening Program, Phase I: Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Medical Screening Program Phase I: Needs Assessment Presented to the Office of Worker Screening and Compensation Support, Office of Health, Safety, and Security U.S. Department of Energy Prepared by Queens College, City University of New York United Steelworkers Original Draft: August 22, 2011 Updated Version: May 1, 2012 Table of Contents Summary.............................................................................3 I. Background on the Former Worker Program................................4 II. History of the WIPP Facility......................................................4 III. Scope of this Report.................................................................7 IV. Exposure Characterization........................................................8

150

Arsenic pilot plant operation and results:Weatherford, Oklahoma.  

SciTech Connect

Narasimhan Consulting Services, Inc. (NCS), under a contract with the Sandia National Laboratories (SNL), designed and operated pilot scale evaluations of the adsorption and coagulation/filtration treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The pilot evaluation was conducted at Well 30 of the City of Weatherford, OK, which supplies drinking water to a population of more than 10,400. Well water contained arsenic in the range of 16 to 29 ppb during the study. Four commercially available adsorption media were evaluated side by side for a period of three months. Both adsorption and coagulation/filtration effectively reduced arsenic from Well No.30. A preliminary economic analysis indicated that adsorption using an iron oxide media was more cost effective than the coagulation/ filtration technology.

Aragon, Malynda Jo; Arora, H. (Narasimhan Consulting Services Inc., Phoenix, Arizona); Karori, Saqib (Narasimhan Consulting Services Inc., Phoenix, Arizona); Pathan, Sakib (Narasimhan Consulting Services Inc., Phoenix, Arizona)

2007-05-01T23:59:59.000Z

151

Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Waste Isolation Pilot Plant May 2011 November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose............................................................................................................................................. 1 2.0 Scope................................................................................................................................................ 1 3.0 Background...................................................................................................................................... 2 4.0 Methodology....................................................................................................................................

152

Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant, November 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Waste Isolation Pilot Plant Waste Isolation Pilot Plant May 2011 November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose............................................................................................................................................. 1 2.0 Scope................................................................................................................................................ 1 3.0 Background...................................................................................................................................... 2 4.0 Methodology....................................................................................................................................

153

Design criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA). Revision 3  

SciTech Connect

This document provides design criteria which shall be used by the architect-engineer in the Title II detail design of the Waste Isolation Pilot Plant. The design criteria present requirements which the architect-engineer must address in the design of the Waste Isolation Pilot Plant.

Not Available

1982-12-01T23:59:59.000Z

154

Gridley Ethanol Demonstration Project Utilizing Biomass Gasification Technology: Pilot Plant Gasifier and Syngas Conversion Testing; August 2002 -- June 2004  

DOE Green Energy (OSTI)

This report is part of an overall evaluation of using a modified Pearson Pilot Plant for processing rice straw into syngas and ethanol and the application of the Pearson technology for building a Demonstration Plant at Gridley. This report also includes information on the feedstock preparation, feedstock handling, feedstock performance, catalyst performance, ethanol yields and potential problems identified from the pilot scale experiments.

Not Available

2005-02-01T23:59:59.000Z

155

Central receiver solar thermal power system, Phase 1: CDRL Item 2, pilot plant preliminary design report. Volume VII. Pilot plant cost and commercial plant cost and performance  

DOE Green Energy (OSTI)

Detailed cost and performance data for the proposed tower focus pilot plant and commercial plant are given. The baseline central receiver concept defined by the MDAC team consists of the following features: (A) an external receiver mounted on a tower, and located in a 360/sup 0/ array of sun-tracking heliostats which comprise the collector subsystem. (B) feedwater from the electrical power generation subsystem is pumped through a riser to the receiver, where the feedwater is converted to superheated steam in a single pass through the tubes of the receiver panels. (C) The steam from the receiver is routed through a downcomer to the ground and introduced to a turbine directly for expansion and generation of electricity, and/or to a thermal storage subsystem, where the steam is condensed in charging heat exchangers to heat a dual-medium oil and rock thermal storage unit (TSU). (D) Extended operation after daylight hours is facilitated by discharging the TSU to generate steam for feeding the admission port of the turbine. (E) Overall control of the system is provided by a master control unit, which handles the interactions between subsystems that take place during startup, shutdown, and transitions between operating modes. (WHK)

Hallet, Jr., R. W.; Gervais, R. L.

1980-05-01T23:59:59.000Z

156

Site Programs & Cooperative Agreements: Waste Isolation Pilot...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Site Programs & Cooperative Agreements: Waste Isolation Pilot Plant Waste Isolation Pilot Plant (WIPP) The DOE Carlsbad Field Office funds a number of...

157

Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 2, Supporting Data  

Science Conference Proceedings (OSTI)

This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2006. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).

Washington TRU Solutions LLC

2007-03-25T23:59:59.000Z

158

Waste Isolation Pilot Plant Transuranic Waste Baseline inventory report. Volume 2. Revision 1  

SciTech Connect

This document is the Baseline Inventory Report for the transuranic (alpha-bearing) wastes stored at the Waste Isolation Pilot Plant (WIPP) in New Mexico. Waste stream profiles including origin, applicable EPA codes, typical isotopic composition, typical waste densities, and typical rates of waste generation for each facility are presented for wastes stored at the WIPP.

1995-02-01T23:59:59.000Z

159

Hydraulic testing of Salado Formation evaporites at the Waste Isolation Pilot Plant site: Second interpretive report  

Science Conference Proceedings (OSTI)

Pressure-pulse, constant-pressure flow, and pressure-buildup tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Transmissivities have been interpreted from six sequences of tests conducted on five stratigraphic intervals within 15 m of the WIPP underground excavations.

Beauheim, R.L. [Sandia National Labs., Albuquerque, NM (United States); Roberts, R.M.; Dale, T.F.; Fort, M.D.; Stensrud, W.A. [INTERA, Inc., Austin, TX (United States)

1993-12-01T23:59:59.000Z

160

Alternative Fuel Pilot Plant & Hydrogen Internal Combustion Engine...  

NLE Websites -- All DOE Office Websites (Extended Search)

a model alternative fuel refueling system, dispensing hydrogen, compressed natural gas (CNG), and hydrogenCNG blends (HCNG). The plant is used daily to fuel vehicles operated in...

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Spent Fuel Pool Risk Assessment Integration Framework (Mark I and II BWRs) and Pilot Plant Application  

Science Conference Proceedings (OSTI)

This report documents the development and pilot application of a generic framework and methodology for conducting a probabilistic risk assessment (PRA) for spent fuel pools at BWR plants with Mark I or II containment designs. A key aspect of the study is the consideration of potential synergistic relationships between adverse conditions in the reactor and the spent fuel pool.BackgroundUsed nuclear fuel from the operation of nuclear power plants is typically ...

2013-05-01T23:59:59.000Z

162

Total capital cost data base: 10MWe Solar Thermal Central Receiver Pilot Plant  

DOE Green Energy (OSTI)

This report describes the total capital cost data base of the 10 MWe Solar Thermal Central Receiver Pilot Plant. This Solar One cost data base was created using the computer code ''Cost Data Management System (CDMS)''. The cost data base format was developed to be used as a common method of presentation of capital costs for power plants. The basic format is a plant system cost breakdown structure. Major accounts are land; structures and improvements; collector, receiver, thermal transport, thermal storage, and stream generation systems; turbine plant; electrical plant; miscellaneous plant systems and equipment; and plant-level indirect costs. Each major account includes subaccounts to as many as nine level of detail. The data base can be accessed to provide elements-of-work costs at any subaccount level or at the plant level. The elements-of-work include sitework/earthwork; concrete work; metal work; architectural; process equipment; piping; electrical; and miscellaneous work. Each of these elements-of-work can be or are broken into finer detail and costs can be accumulated to identify more specific needs, e.g., pipe insulation or heat exchangers. The cost data base can be accessed and various reports can be generated. These vary from a single page summary to detailed listings of costs and notes. Reported costs can be stated in dollars, dollars per kilowatt or percentage of the total plant cost. Reports or samples of reports for the pilot plant capital cost are included.

Norris, H.F. Jr.

1986-05-01T23:59:59.000Z

163

Pilot-plant technical assessment of wet flue gas desulfurization using limestone  

Science Conference Proceedings (OSTI)

An experimental study was performed on a countercurrent pilot-scale packed scrubber for wet flue gas desulfurization (FGD). The flow rate of the treated flue gas was around 300 Nm{sup 3}/h, so the pilot-plant capacity is one of the largest with respect to other published studies on a pilot-plant wet FGD. The tests were carried out at an SO{sub 2} inlet concentration of 2000 ppm by changing the recycle slurry pH to around 4.8 and the L/G ratio to between 7.5 and 15. Three types of limestone were tested, obtaining desulfurization efficiencies from 59 to 99%. We show the importance of choosing an appropriate limestone in order to get a better performance from the FGD plant. Thus, it is important to know the reactivity (on a laboratory scale) and the sorbent utilization (on a pilot-plant scale) in order to identify if a limestone is reactive enough and to compare it with another type. In addition, by using the transfer-unit concept, a function has been obtained for the desulfurization efficiency, using the L/G ratio and the recycle slurry pH as independent variables. The Ca/S molar ratio is related to these and to the SO{sub 2} removal efficiency. This function, together with a simplified function of the operation variable cost, allows us to determine the pair (L/G ratio and pH) to achieve the desired SO{sub 2} removal with the minimum operation cost. Finally, the variable operation costs between packed towers and spray scrubbers have been compared, using as a basis the pilot packed tower and the industrial spray column at the Compostilla Power Station's FGD plant (in Leon, Spain).

Ortiz, F.J.G.; Vidal, F.; Ollero, P.; Salvador, L.; Cortes, V.; Gimenez, A. [University of Seville, Seville (Spain)

2006-02-15T23:59:59.000Z

164

The design of future central receiver power plants based on lessons learned from the Solar One Pilot Plant  

SciTech Connect

The 10-MW{sub e} Solar One Pilot Plant was the world's largest solar central receiver power plant. During its power production years it delivered over 37,000 MWhrs (net) to the utility grid. In this type of electric power generating plant, large sun-tracking mirrors called heliostats reflect and concentrate sunlight onto a receiver mounted on top a of a tower. The receiver transforms the solar energy into thermal energy that heats water, turning it into superheated steam that drives a turbine to generate electricity. The Solar One Pilot Plant successfully demonstrated the feasibility of generating electricity with a solar central receiver power plant. During the initial 2 years the plant was tested and 4 years the plant was operated as a power plant, a great deal of data was collected relating to the efficiency and reliability of the plant's various systems. This paper summarizes these statistics and compares them to goals developed by the US Department of Energy. Based on this comparison, improvements in the design and operation of future central receiver plants are recommended. Research at Sandia National Laboratories and the US utility industry suggests that the next generation of central receiver power plants will use a molten salt heat transfer fluid rather than water/steam. Sandia has recently completed the development of the hardware needed in a molten salt power plant. Use of this new technology is expected to solve many of the performance problems encountered at Solar One. Projections for the energy costs from these future central receiver plants are also presented. For reference, these projections are compared to the current energy costs from the SEGS parabolic trough plants now operating in Southern California.

Kolb, G.J.

1991-01-01T23:59:59.000Z

165

The design of future central receiver power plants based on lessons learned from the Solar One Pilot Plant  

DOE Green Energy (OSTI)

The 10-MW{sub e} Solar One Pilot Plant was the world's largest solar central receiver power plant. During its power production years it delivered over 37,000 MWhrs (net) to the utility grid. In this type of electric power generating plant, large sun-tracking mirrors called heliostats reflect and concentrate sunlight onto a receiver mounted on top a of a tower. The receiver transforms the solar energy into thermal energy that heats water, turning it into superheated steam that drives a turbine to generate electricity. The Solar One Pilot Plant successfully demonstrated the feasibility of generating electricity with a solar central receiver power plant. During the initial 2 years the plant was tested and 4 years the plant was operated as a power plant, a great deal of data was collected relating to the efficiency and reliability of the plant's various systems. This paper summarizes these statistics and compares them to goals developed by the US Department of Energy. Based on this comparison, improvements in the design and operation of future central receiver plants are recommended. Research at Sandia National Laboratories and the US utility industry suggests that the next generation of central receiver power plants will use a molten salt heat transfer fluid rather than water/steam. Sandia has recently completed the development of the hardware needed in a molten salt power plant. Use of this new technology is expected to solve many of the performance problems encountered at Solar One. Projections for the energy costs from these future central receiver plants are also presented. For reference, these projections are compared to the current energy costs from the SEGS parabolic trough plants now operating in Southern California.

Kolb, G.J.

1991-01-01T23:59:59.000Z

166

10 MWe Solar Thermal Central Receiver Pilot Plant: 1983 operational test report  

DOE Green Energy (OSTI)

The design and construction of the world's largest solar thermal central receiver electric power plant, the 10 MWe Solar Thermal Central Receiver Pilot Plant, ''Solar One,'' located near Barstow, California, were completed in 1982. The plant continued in the two-year experimental Test and Evaluation phase throughout 1983. Experiences during 1983 have shown that all parts of the plant, especially solar unique ones, operated as well as or better than expected. It was possible to incorporate routine power production into the Test and Evaluation phase because plant performance yielded high confidence. All operational modes were tested, and plant automation activities began in earnest. This report contains: (1) a brief description of the plant system; (2) a summary of the year's experiences; (3) topical sections covering preliminary power production, automation activities, and receiver leak repairs; (4) a monthly list of principal activities; and (5) operation and maintenance costs.

Bartel, J.J.

1986-01-01T23:59:59.000Z

167

10 MWe solar thermal central receiver pilot plant control system automation test report  

DOE Green Energy (OSTI)

This report describes results of tests on the automatic features added to the control system for the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, CA. The plant, called Solar One, is a cooperative activity between the Department of Energy and the Associates: Southern California Edison, the Los Angeles Dept. of Water and Power and the California Energy Commission. This report provides an overview of the automation features added to the plant control system, a description of tests performed on the system, and the results of those tests.

Not Available

1987-04-01T23:59:59.000Z

168

Surry Seismic Probabilistic Risk Assessment Pilot Plant Review  

Science Conference Proceedings (OSTI)

The American Society of Mechanical Engineers (ASME) and the American Nuclear Society (ANS) have developed the "Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications." The objective of the standard is to provide basic requirements for performing probabilistic risk assessments (PRAs) that would support future risk-informed decisions. The standard limits its requirements to performing a Level 1 analysis of the core damage frequency and a limite...

2010-07-16T23:59:59.000Z

169

The advanced PFB process: Pilot plant results and design studies  

SciTech Connect

The plant being developed is a hybrid of two technologies; it incorporates the partial gasification of coal in a vessel called the carbonizer and the combustion of the resultant char residue in a circulating pressurized fluidized bed combustor (CPFBC). In this plant, coal is fed to a pressurized carbonizer that produces a low-Btu fuel gas and char. After passing through a cyclone and a ceramic barrier filter to remove gas-entrained particulates, the fuel gas is burned in a topping combustor to produce the energy required to drive a gas turbine. The gas turbine drives a generator and a compressor that feeds air to the carbonizer, a CPFBC, and a fluidized bed heat exchanger (FBHE). The carbonizer char is burned in the CPFBC with high excess air. The vitiated air from the CPFBC supports combustion of the fuel gas in the gas turbine topping combustor. Steam generated in a heat-recovery steam generator (HRSG) downstream of the gas turbine and in the FBHE associated with the CPFBC drives the steam turbine generator that furnishes the balance of electric power delivered by the plant. The low-Btu gas is produced in the carbonizer by pyrolysis/mild devolatilization of coal in a fluidized bed reactor. Because this unit operates at temperatures much lower than gasifiers currently under development, it also produces a char residue. Left untreated, the fuel gas will contain hydrogen sulfide and sulfur-containing tar/light oil vapors; therefore, lime-based sorbents are injected into the carbonizer to catalytically enhance tar cracking and to capture sulfur as calcium sulfide. Sulfur is captured in situ, and the raw fuel gas is fired hot. Thus the expensive, complex, fuel gas heat exchangers and the chemical or sulfur-capturing bed cleanup systems that are part of the coal gasification combined-cycle plants now being developed are eliminated.

Robertson, A. [Foster Wheeler Development Corp., Livingston, NJ (United States); Domeracki, W. [Westinghouse Power Generation Business Group, Orlando, FL (United States); Horazak, D. [Gilbert/Commonwealth, Green Hills, PA (United States); Newby, R. [Westinghouse Science and Technology Center, Pittsburgh, PA (United States); Rehmat, A. [Institute of Gas Technology, Chicago IL (United States)

1993-11-01T23:59:59.000Z

170

Socioeconomic study for the proposed waste isolation pilot plant  

Science Conference Proceedings (OSTI)

This document presents the historical and existing socioeconomic conditions in the vicinity of the proposed plant, projected changes in those conditions with and without the plant, and an outline of the various techniques used to make these projections. The analysis predicts impacts on the general economy in the area near the plant and on employment, personal income, population, social structure, the private economic sector, housing, land use, community services and facilities, and local government finances. Among the most important results are the following predictions: The economy of the area will derive $165 million directly and indirectly during the first 7.5 years of the project. After that, it will derive about $21 million directly and indirectly during each year of full operation. About 2100 jobs will be created directly and indirectly at the peak of the construction and about 950 jobs during the full operation. A net in-migration will occur: about 2250 people at the peak of the construction and about 1000 people during operation. A housing shortage may begin in Carlsbad in 1981 or 1982 and last for about 2 years.

Not Available

1980-10-01T23:59:59.000Z

171

Modeling Tomorrow's Biorefinery - the NREL Biochemical Pilot Plant; Biomass Program (Brochure)  

NLE Websites -- All DOE Office Websites (Extended Search)

great ideas into viable solutions great ideas into viable solutions requires the ability to test theories under real world conditions. Few companies have the resources to build pilot-scale processing plants to test their ideas. The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) helps by sharing its world-class equipment and expertise with industry and other research organizations through a variety of contractual arrangements. At the NREL campus in Golden, Colo., researchers use state-of-the-art laboratories to develop and improve the technologies that convert biomass to fuels, chemicals, and materials. One of the most important tools available to biomass researchers is the Biochemical Pilot Plant housed in the Alternative Fuels User Facility (AFUF). In this facility,

172

Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989  

Science Conference Proceedings (OSTI)

This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

Not Available

1989-01-01T23:59:59.000Z

173

U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 Media Contact: Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 i For immediate release Magnum Minerals to Buy WIPP Salt CARLSBAD, N.M., December 21, 2009- The U.S. Department of Energy's (DOE) Carlsbad Field Office (CBFO) has worked out an agreement to sell 300,000 tons of run-of-mine salt from the Waste Isolation Pilot Plant (WIPP) to Magnum Minerals LLC of Hereford, Texas. As part of the agreement, the Carlsbad Soil and Water Conservation District (CSWCD) will sign and administer the contract with Magnum Minerals, allowing proceeds to remain in southeast New Mexico. In 2008, DOE management and operating contractor, Washington TRU Solutions, issued

174

Department of Energy Announces Selection of Transportation Contractors at the Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Announces Selection of Transportation Department of Energy Announces Selection of Transportation Contractors at the Waste Isolation Pilot Plant Carlsbad, N.M., August 21, 2000 -- The U.S. Department of Energy (DOE) today announced the selection of Tri-State Motor Transit Co. (TSMT) and CAST Transportation, Inc. (CAST) to transport radioactive transuranic waste from DOE generator sites throughout the United States to the Waste Isolation Pilot Plant (WIPP) near Carlsbad, NM. Following a request for proposals issued on January 14, 2000, DOE determined that TSMT and CAST submitted the most advantageous offer to the government to transport transuranic waste to WIPP. TSMT, based in Joplin, MO, is a nationwide carrier with experience hauling hazardous and radiological shipments for DOE. CAST, based in Henderson, CO, is the current carrier

175

Separation of packaging plastics by froth flotation in a continuous pilot plant  

Science Conference Proceedings (OSTI)

The objective of the research was to apply froth flotation to separate post-consumer PET (Polyethylene Terephthalate) from other packaging plastics with similar density, in a continuously operated pilot plant. A representative sample composed of 85% PET, 2.5% PVC (Polyvinyl Chloride) and 11.9% PS (Polystyrene) was subjected to a combination of alkaline treatment and surfactant adsorption followed by froth flotation. A mineral processing pilot plant, owned by a Portuguese mining company, was adapted for this purpose. The experimentation showed that it is possible to produce an almost pure concentrate of PET, containing 83% of the PET in feed, in a single bank of mechanical flotation cells. The concentrate grade attained was 97.2% PET, 1.1% PVC and 1.1% PS. By simulation it was shown that the Portuguese recycling industry specifications can be attained if one cleaning and one scavenger stages are added to the circuit.

Carvalho, Teresa, E-mail: teresa.carvalho@ist.utl.p [CERENA, Instituto Superior Tecnico, Av. Rovisco Pais, 1049-001 Lisbon (Portugal); Durao, Fernando; Ferreira, Celia [CERENA, Instituto Superior Tecnico, Av. Rovisco Pais, 1049-001 Lisbon (Portugal)

2010-11-15T23:59:59.000Z

176

Review of the Waste Isolation Pilot Plant Work Planning and Control Activities, April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review of the Independent Oversight Review of the Waste Isolation Pilot Plant Work Planning and Control Activities April 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1 4.0 Methodology......................................................................................................................................... 2

177

Solar Pilot Plant: Phase I. Quarterly report No. 3, April--June 1976. CDRL item No. 10. [10 MW  

DOE Green Energy (OSTI)

The baseline design for a 10 MW proof-of-concept pilot central receiver solar power plant is described. Detailed designs for the collector, steam generator, and thermal storage subsystem research experiments are presented. (WHK)

None

1976-10-28T23:59:59.000Z

178

Hydrometallurgical recovery of germanium from coal gasification fly ash: pilot plant scale evaluation  

Science Conference Proceedings (OSTI)

In this article, a hydrometallurgical method for the selective recovery of germanium from fly ash (FA) has been tested at pilot plant scale. The pilot plant flowsheet comprised a first stage of water leaching of FA, and a subsequent selective recovery of the germanium from the leachate by solvent extraction method. The solvent extraction method was based on Ge complexation with catechol in an aqueous solution followed by the extraction of the Ge-catechol complex (Ge(C{sub 6}H{sub 4}O{sub 2}){sub 3}{sup 2-}) with an extracting organic reagent (trioctylamine) diluted in an organic solvent (kerosene), followed by the subsequent stripping of the organic extract. The process has been tested on a FA generated in an integrated gasification with combined cycle (IGCC) process. The paper describes the designed 5 kg/h pilot plant and the tests performed on it. Under the operational conditions tested, approximately 50% of germanium could be recovered from FA after a water extraction at room temperature. Regarding the solvent extraction method, the best operational conditions for obtaining a concentrated germanium-bearing solution practically free of impurities were as follows: extraction time equal to 20 min; aqueous phase/organic phase volumetric ratio equal to 5; stripping with 1 M NaOH, stripping time equal to 30 min, and stripping phase/organic phase volumetric ratio equal to 5. 95% of germanium were recovered from water leachates using those conditions.

Arroyo, F.; Fernandez-Pereira, C.; Olivares, J.; Coca, P. [University of Seville, Seville (Spain)

2009-04-15T23:59:59.000Z

179

10-MWe pilot-plant-receiver-panel test-requirements document: Solar Thermal Test Facility  

DOE Green Energy (OSTI)

Plans are presented for insolation testing of a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally the design planned for the 10 MWe pilot plant. Testing includes operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. A brief description of the pilot plant receiver subsystem is presented, followed by a detailed description of the receiver assembly to be tested at the Solar Thermal Test Facility. Major subassemblies are described, including the receiver panel, flow control, electrical control and instrumentation, and the structural assembly. Requirements of the Solar Thermal Test Facility for the tests are given. System safety measures are described. The tests, operating conditions, and expected results are presented. Quality assurance, task responsibilities, and test documentation are also discussed. (LEW)

Not Available

1978-06-10T23:59:59.000Z

180

LLNL (Lawrence Livermore National Laboratory) Oil Shale Pilot Plant status report  

SciTech Connect

The authors are studying aboveground oil shale retorting and have developed the LLNL Hot-Recycled-Solid (HRS) process as a generic, second-generation, rapid pyrolysis retorting system in which recycled shale is the solid heat carrier. In 1984-87, they operated a 1 ton-per-day HRS pilot plant to study retorting chemistry in an actual recirculation loop, Cena (1986). In 1989 they upgraded their laboratory pilot plant to process 4 ton-per-day of commercially sized shale, which will allow them, for the first time, to study pyrolysis and combustion chemistry using the full particle size, to produce enough oil for detailed characterization studies, to study environmental consequences, and to begin answering the many bulk solid handling questions concerning scale-up of the HRS process. In this paper the authors report on the status of their pilot plant operations. They have operated the facility circulating raw shale at ambient temperature and dolomite at elevated temperature. They plan the first hot shale run in November 1990. 5 refs., 16 figs., 4 tabs.

Cena, R.J.; Thorsness, C.B.

1990-10-26T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Final report on the power production phase of the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant  

DOE Green Energy (OSTI)

This report describes the evaluations of the power production testing of Solar One, the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant near Barstow, California. The Pilot Plant, a cooperative project of the US Department of Energy and utility firms led by the Southern California Edison Company, began a three year period of power production operation in August 1984. During this period, plant performance indicators, such as capacity factor, system efficiency, and availability, were studied to assess the operational capability of the Pilot Plant to reliably supply electrical power. Also studied was the long-term performance of such key plant components as the heliostats and the receiver. During the three years of power production, the Pilot Plant showed an improvement in performance. Considerable increases in capacity factor, system efficiency, and availability were achieved. Heliostat operation was reliable, and only small amounts of mirror corrosion were observed. Receiver tube leaks did occur, however, and were the main cause of the plant's unscheduled outages. The Pilot Plant provided valuable lessons which will aid in the design of future solar central receiver plants. 53 refs., 46 figs., 4 tabs.

Radosevich, L.G.

1988-03-01T23:59:59.000Z

182

Solar Pilot Plant, Phase I. Preliminary design report. Volume V. Thermal storage subsystem. CDRL item 2  

DOE Green Energy (OSTI)

Design, specifications, and diagrams for the thermal storage subsystem for the 10-MW pilot tower focus power plant are presented in detail. The Honeywell thermal storage subsystem design features a sensible heat storage arrangement using proven equipment and materials. The subsystem consists of a main storage containing oil and rock, two buried superheater tanks containing inorganic salts (Hitec), and the necessary piping, instrumentation, controls, and safety devices. The subsystem can provide 7 MW(e) for three hours after twenty hours of hold. It can be charged in approximately four hours. Storage for the commercial-scale plant consists of the same elements appropriately scaled up. Performance analysis and tradeoff studies are included.

None

1977-05-01T23:59:59.000Z

183

10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning  

DOE Green Energy (OSTI)

The various considerations related to the Phase II schedules, material control and personnel training required to effectively implement the program are presented. The flow charts and schedules required to accomplish fabrication, installation, checkout, and personnel training to support the Pilot Plant schedule are identified. The planning addresses receiving, storage and shipment of raw materials, subassemblies, component, subsystems, and complete assemblies. The vendor activities and the major Martin Marietta facilities are included. These are the Mirror Assembly activities at Pueblo, Colorado and the heliostat assembly and installation activities at the Barstow-Daggett Airport and the solar plant. (LEW)

Not Available

1979-08-01T23:59:59.000Z

184

Model predictive control of a wet limestone flue gas desulfurization pilot plant  

SciTech Connect

A model predictive control (MPC) strategy based on a dynamic matrix (DMC) is designed and applied to a wet limestone flue gas desulfurization (WLFGD) pilot plant to evaluate what enhancement in control performance can be achieved with respect to a conventional decentralized feedback control strategy. The results reveal that MPC can significantly improve both reference tracking and disturbance rejection. For disturbance rejection, the main control objective in WLFGD plants, selection of tuning parameters and sample time, is of paramount importance due to the fast effect of the main disturbance (inlet SO{sub 2} load to the absorber) on the most important controlled variable (outlet flue gas SO{sub 2} concentration). The proposed MPC strategy can be easily applied to full-scale WLFGD plants.

Perales, A.L.V.; Ollero, P.; Ortiz, F.J.G.; Gomez-Barea, A. [University of Seville, Seville (Spain). Dept. of Chemical & Environmental Engineering

2009-06-15T23:59:59.000Z

185

Central receiver solar thermal power system, Phase 1. CRDL Item 2. Pilot plant preliminary design report. Volume III, Book 2. Collector subsystem  

DOE Green Energy (OSTI)

The methods and plans for the manufacture of the 10-MW collector heliostats and associated controls for the pilot plant are detailed. An in-depth description of the production, installation, and verification testing of heliostats for the pilot plant is presented. Specifications for the performance, design, and test requirements for the pilot plant collector subsystem are included. Also, a heliostat location summary report is given. (WHK)

Hallet, Jr., R. W.; Gervais, R. L.

1977-10-01T23:59:59.000Z

186

Pilot Plant Assessment of Blend Properties and Their Impact on Critical Power Plant Components  

Science Conference Proceedings (OSTI)

Low-sulfur subbituminous coals, currently in demand to meet regulated SO2 emission standards, are very different in composition from bituminous coal and affect many operating characteristics when fired in boilers designed for bituminous coal. This report documents a pilot-scale study of the relative impacts of a subbituminous coal or blend containing subbituminous coal on unit operating characteristics such as mill performance, furnace wall slagging, convective pass fouling, and electrostatic precipitato...

1999-02-02T23:59:59.000Z

187

EVALUATION OF AUTOMATIC DATA PROCESSING IN THE FLUORIDE VOLATILITY PILOT PLANT  

SciTech Connect

Automatic data logging and digital-computer techniques were evaluated in the ORNL Fluoride Volatiltty Pilot Plant, The data reduction sequence consisted of encoding plant signals from conventional instrumentation, digitizing the encoded signals with an on-line automatic data logger, and processing the logged data off-line with a digital computer. Data reduction and computational codes were useful in disseminating process data, with photographic curve plots being the most efficient means. Considerable difficulty was experienced with logger output errors, which complicated the data processing and frequently resulted in erroneous results. After continuous operation of the data-processing sequence for 12 months it was concluded that output from a data logger is of limited use without recourse to a computer, loading of raw logger data to the computer and subsequent conversion to a useful form (engineering units) can account for up to 70% of total computer charges, and some backup to automatic data logging, either as continuous or manual recording, may be desirable because logger downtime may be as much as 5%. The use of the data reduction sequence will be continued in the pilot plant. Expanding the sequence to include on-line computation and process control features is not justified because of process limitations. (auth)

Moncrief, E. C.; Hill, M. C.

1963-01-01T23:59:59.000Z

188

Photocatalytic degradation of oil industry hydrocarbons models at laboratory and at pilot-plant scale  

Science Conference Proceedings (OSTI)

Photodegradation/mineralization (TiO{sub 2}/UV Light) of the hydrocarbons: p-nitrophenol (PNP), naphthalene (NP) and dibenzothiophene (DBT) at three different reactors: batch bench reactor (BBR), tubular bench reactor (TBR) and tubular pilot-plant (TPP) were kinetically monitored at pH = 3, 6 and 10, and the results compared using normalized UV light exposition times. The results fit the Langmuir-Hinshelwood (LH) model; therefore, LH adsorption equilibrium constants (K) and apparent rate constants (k) are reported as well as the apparent pseudo-first-order rate constants, k{sub obs}{sup '} = kK/(1 + Kc{sub r}). The batch bench reactor is the most selective reactor toward compound and pH changes in which the reactivity order is: NP > DBT > PNP, however, the catalyst adsorption (K) order is: DBT > NP > PNP at the three pH used but NP has the highest k values. The tubular pilot-plant (TPP) is the most efficient of the three reactors tested. Compound and pH photodegradation/mineralization selectivity is partially lost at the pilot plant where DBT and NP reaches ca. 90% mineralization at the pH used, meanwhile, PNP reaches only 40%. The real time, in which these mineralization occur are: 180 min for PNP and 60 min for NP and DBT. The mineralization results at the TPP indicate that for the three compounds, the rate limiting step is the same as the degradation one. So that, there is not any stable intermediate that may accumulate during the photocatalytic treatment. (author)

Vargas, Ronald; Nunez, Oswaldo [Laboratorio de Fisicoquimica Organica y Quimica Ambiental, Departamento de Procesos y Sistemas, Universidad Simon Bolivar, Apartado Postal 89000, Caracas (Venezuela)

2010-02-15T23:59:59.000Z

189

Temperature Profile Measurements in a Newly Constructed 30-Stage 5 cm Centrifugal Contactor pilot Plant  

Science Conference Proceedings (OSTI)

An annular centrifugal contactor pilot plant incorporating 30 stages of commercial 5 cm CINC V-02 units has been built and operated at INL during the past year. The pilot plant includes an automated process control and data acquisitioning system. The primary purpose of the pilot plant is to evaluate the performance of a large number of inter-connected centrifugal contactors and obtain temperature profile measurements within a 30-stage cascade. Additional solvent extraction flowsheet testing using stable surrogates is also being considered. Preliminary hydraulic testing was conducted with all 30 contactors interconnected for continuous counter-current flow. Hydraulic performance and system operational tests were conducted successfully but with higher single-stage rotor speeds found necessary to maintain steady interstage flow at flowrates of 1 L/min and higher. Initial temperature profile measurements were also completed in this configuration studying the performance during single aqueous and two-phase counter-current flow at ambient and elevated inlet solution temperatures. Temperature profile testing of two discreet sections of the cascade required additional feed and discharge connections. Lamp oil, a commercially available alkane mixture of C14 to C18 chains, and tap water adjusted to pH 2 were the solution feeds for all the testing described in this report. Numerous temperature profiles were completed using a newly constructed 30-stage centrifugal contactor pilot plant. The automated process control and data acquisition system worked very well throughout testing. Temperature data profiles for an array of total flowrates (FT) and contactor rpm values for both single-phase and two-phase systems have been collected with selected profiles and comparisons reported. Total flowrates (FT) ranged from 0.5-1.4 L/min with rotor speeds from 3500-4000 rpm. Solution inlet temperatures ranging from ambient up to 50 C were tested. Ambient temperature testing shows that a small amount of heat is added to the processed solution by the mechanical energy of the contactors. The temperature profiles match the ambient temperature of the laboratory but are nearly 10 C higher toward the middle of the cascade. Heated input solution testing provides temperature profiles with smaller temperature gradients and are more influenced by the temperature of the inlet solutions than the ambient laboratory temperature. The temperature effects of solution mixing, even at 4000 rpm, were insignificant in any of the studies conducted on lamp oil and water.

Troy G. Garn; Dave H. Meikrantz; Mitchell R. Greenhalgh; Jack D. Law

2008-09-01T23:59:59.000Z

190

Pilot plant studies of the bioconversion of cellulose and production of ethanol  

DOE Green Energy (OSTI)

Progress is reported in several areas of research. The following cellulosic raw materials were selected for study: wheat, barley, and rice straws, rice hulls, sorghum, corn stover, cotton gin trash, newsprint, ground wood, and masonite steam-treated Douglas fir and redwood. Samples were collected, prepared, and analyzed for hexosans, pentosans, lignin, ash, and protein. Results of acid extraction and enzymatic hydrolysis are discussed. Yields of glucose, polyglucose, xylose, and arabinose are reported. Progress in process design and economic studies, as well as pilot plant process development and design studies, is summarized. (JGB)

Wilke, C.R.

1977-01-31T23:59:59.000Z

191

Management of the ten-megawatt solar-thermal central-receiver pilot-plant project  

DOE Green Energy (OSTI)

This report deals with inspection (between April and May 1979) of the Ten-Megawatt Solar-Thermal Central-Receiver Pilot-Plant Project being constructed in Barstow, California by the Department of Energy (DOE) and a utility consortium. At the time of inspection the project was behind schedule and over its projected cost. The project was subsequently rescheduled for initial operation by June 1982 at an estimated cost of $139.5 million. Recommendations are included relative to: better utilization of DOE resources; modified date for initial operation; and initiation of independent management audits. Comments to the draft report are appended. (PSB)

Not Available

1980-06-20T23:59:59.000Z

192

SOLERAS - Solar Energy Water Desalination Project: Martin Marietta Corporation. Pilot plant final report  

Science Conference Proceedings (OSTI)

This report documents the technical effort of Martin Marietta Corporation, in association with Black and Veatch International as a subcontractor for the trade studies performed to design a Solar Desalination Pilot Plant is documented. The final system configuration utilizes existing technology to convert seawater to potable water. This technology includes the collection of solar energy, storage of this energy in a fluid heat transfer medium, generation of steam and electricity from this stored energy, utilization of low pressure turbine exhaust steam as a source of energy to distill salt water, and also generation of potable water through the use of a reverse osmosis unit.

Not Available

1985-01-01T23:59:59.000Z

193

Decontamination and decommissioning of the EBR-I complex. Topical report No. 3. NAK disposal pilot plant test  

SciTech Connect

Decontamination and decommissioning of the Experimental Breeder Reactor No. 1 (EBR-I) requires processing of the primary coolant, an eutectic solution of sodium and potassium (NaK), remaining in the EBR-I primary and secondary coolant systems. While developing design criteria for the NaK processing system, reasonable justification was provided for the development of a pilot test plant for field testing some of the process concepts and proposed hardware. The objective of this activity was to prove the process concept on a low-cost, small- scale test bed. The pilot test plant criteria provided a general description of the test including: the purpose, location, description of test equipment available, waste disposal requirements, and a flow diagram and conceptual equipment layout. The pilot plant test operations procedure provided a detailed step-by-step procedure for operation of the pilot plant to obtain the desired test data and operational experience. It also spelled out the safety precautions to be used by operating personnel, including the requirement for alkali metals training certification, use of protective clothing, availability of fire protection equipment, and caustic handling procedures. The pilot plant test was performed on May 16, 1974. During the test, 32.5 gallons or 240 lb of NaK was successfully converted to caustic by reaction with water in a caustic solution. (auth)

Commander, J C; Lewis, L; Hammer, R

1975-06-01T23:59:59.000Z

194

Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1  

SciTech Connect

The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals.

NONE

1995-03-31T23:59:59.000Z

195

Test results from the 500 kW direct contact pilot plant at East Mesa  

DOE Green Energy (OSTI)

A 500 kW power plant utilizing direct contact heat exchange (DCHX) between the geothermal brine and the isobutane (IC/sub 4/) working fluid is being operated at the East Mesa test facility. The power plant incorporates a 40-inch-diameter direct-contactor approximately 35 feet tall. The purpose of the pilot plant is to determine the feasibility of large-scale direct-contact heat exchange and power plant operation with the DCHX. The binary cycle offers higher conversion factors (heat energy transformed to electrical energy) than the flashed steam approach for geothermal brines in the 300 to 400/sup 0/F range and preliminary results indicate the DCHX system may have higher performance than the conventional tube-and-shell binary approach. This performance advantage results from the absence of any fouling and the very close pinch temperatures achieved in the DCHX itself. The baseline performance tests for the plant were completed in January 1980. The results of these tests and follow-on testing are covered.

Nichols, K.E.; Olander, R.G.; Lobach, J.L.

1980-09-01T23:59:59.000Z

196

Final design, installation and baseline testing of 500 kW direct contact pilot plant at East Mesa  

SciTech Connect

The pilot plant was configured to accomplish two objectives - first to evaluate the overall performance potential of direct contact powerplants and second to develop design criteria and parameters for full-scale direct contact plants. The pilot plant includes all of the process functions that would be incorporated in a full-scale plant. Incoming brine is treated to remove undissolved gases, pumped through the direct contact heat exchanger (DCHX), and then sent to a recovery system for removal of the dissolved working fluid. The chosen working fluid is isobutane (IC/sub 4/). The working fluid loop includes a radial inflow turbine with generator, condensers, hot-well reservoir, and a feed pump. A downwell pump was installed in the geothermal well to supply the plant with unflashed brine. (MHR)

Hlinak, A.; Lobach, J.; Nichols, K.; Olander, R.; Werner, D.

1980-05-30T23:59:59.000Z

197

Accounting strategy of tritium inventory in the heavy water detritiation pilot plant from ICIT Rm. Valcea  

Science Conference Proceedings (OSTI)

In this paper we present a methodology for determination of tritium inventory in a tritium removal facility. The method proposed is based on the developing of computing models for accountancy of the mobile tritium inventory in the separation processes, of the stored tritium and of the trapped tritium inventory in the structure of the process system components. The configuration of the detritiation process is a combination of isotope catalytic exchange between water and hydrogen (LPCE) and the cryogenic distillation of hydrogen isotopes (CD). The computing model for tritium inventory in the LPCE process and the CD process will be developed basing on mass transfer coefficients in catalytic isotope exchange reactions and in dual-phase system (liquid-vapour) of hydrogen isotopes distillation process. Accounting of tritium inventory stored in metallic hydride will be based on in-bed calorimetry. Estimation of the trapped tritium inventory can be made by subtraction of the mobile and stored tritium inventories from the global tritium inventory of the plant area. Determinations of the global tritium inventory of the plant area will be made on a regular basis by measuring any tritium quantity entering or leaving the plant area. This methodology is intended to be applied to the Heavy Water Detritiation Pilot Plant from ICIT Rm. Valcea (Romania) and to the Cernavoda Tritium Removal Facility (which will be built in the next 5-7 years). (authors)

Bidica, N.; Stefanescu, I. [Inst. of Cryogenics and Isotopes Technologies, Uzinei Str. No. 4, Rm. Valcea (Romania); Cristescu, I. [TLK, Forschungszentrum Karlsruhe, Postfach 3640, D76021 Karlsruhe (Germany); Bornea, A.; Zamfirache, M.; Lazar, A.; Vasut, F.; Pearsica, C.; Stefan, I. [Inst. of Cryogenics and Isotopes Technologies, Uzinei Str. No. 4, Rm. Valcea (Romania); Prisecaru, I.; Sindilar, G. [Univ. Politehnica of Bucharest, Splaiul Independentei 313, Bucharest (Romania)

2008-07-15T23:59:59.000Z

198

,"Energy","Water","Renewable","Petroleum","Alt. Fuel",,"On-Line Data Collection System",,"Report Period","Due In",,,"Primary","Secondary","Secondary"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy","Water","Renewable","Petroleum","Alt. Fuel",,"On-Line Data Collection System",,"Report Period","Due In",,,"Primary","Secondary","Secondary" Energy","Water","Renewable","Petroleum","Alt. Fuel",,"On-Line Data Collection System",,"Report Period","Due In",,,"Primary","Secondary","Secondary" 2003,,,,,,,"EMS4","Environmental Management System","Fiscal Year (Oct 1 - Sept 30)","November 15",,"Fiscal Year",2009 2004,,,,,,,"FAST","Federal Automotive Statistical Tool","Fiscal Year (Oct 1 - Sept 30)","October 31",,"Department","Department of Energy" 2005,-2.775557562e-17,,,0,0,,"FIMS","Facilities Information Management System","Fiscal Year (Oct 1 - Sept 30)","November 15",,"Program","Office of Legacy Management"

199

Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico  

SciTech Connect

This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

Not Available

1993-07-01T23:59:59.000Z

200

Microbial Gas Generation Under Expected Waste Isolation Pilot Plant Repository Conditions: Final Report  

Science Conference Proceedings (OSTI)

Gas generation from the microbial degradation of the organic constituents of transuranic (TRU) waste under conditions expected in the Waste Isolation Pilot Plant (WIPP) was investigated. The biodegradation of mixed cellulosic materials and electron-beam irradiated plastic and rubber materials (polyethylene, polyvinylchloride, hypalon, leaded hypalon, and neoprene) was examined. We evaluated the effects of environmental variables such as initial atmosphere (air or nitrogen), water content (humid ({approx}70% relative humidity, RH) and brine inundated), and nutrient amendments (nitogen phosphate, yeast extract, and excess nitrate) on microbial gas generation. Total gas production was determined by pressure measurement and carbon dioxide (CO{sub 2}) and methane (CH{sub 4}) were analyzed by gas chromatography; cellulose degradation products in solution were analyzed by high-performance liquid chromatography. Microbial populations in the samples were determined by direct microscopy and molecular analysis. The results of this work are summarized.

Gillow, J.B.; Francis, A.

2011-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis  

Science Conference Proceedings (OSTI)

This Safety Evaluation Report (SER) documents the Department of Energys (DOE's) review of Revision 9 of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis, DOE/WIPP-95-2065 (WIPP CH DSA), and provides the DOE Approval Authority with the basis for approving the document. It concludes that the safety basis documented in the WIPP CH DSA is comprehensive, correct, and commensurate with hazards associated with CH waste disposal operations. The WIPP CH DSA and associated technical safety requirements (TSRs) were developed in accordance with 10 CFR 830, Nuclear Safety Management, and DOE-STD-3009-94, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Safety Analysis Reports.

Washington TRU Solutions LLC

2005-09-01T23:59:59.000Z

202

REPROCESSING OF ARE FUEL, VOLATILITY PILOT PLANT RUNS E-1 AND E-2  

SciTech Connect

After two batches ( approximately 340 kg) of fluoride salt from the ARE were reprocessed, a pilot plant operations were terminated because of a leak through which an estimated 780 g of uranium (as UF/sub 6/ escaped. Of the 21 kg of highly enriched uranium in the feed, 93.12% was collected as UF/sub 6/ product, 0.13% represented measured losses, and 3.72% was unaccounted for (leak). An additional 3.03% was reclaimed from NaF beds and equipment washes. The produce met both chemical purity and activity specifications for product level UF/ sub 6/. Decontamination from fission products was essentially complete. A gross gamma decontamination factor was apparently limited by the low activity of the feed salt. (auth)

Whitmarsh, C.L.

1959-05-11T23:59:59.000Z

203

REPROCESSING OF ARE FUEL, VOLATILITY PILOT PLANT RUNS E-3 THROUGH E-6  

SciTech Connect

Reprocessing of the ARE fuel was resumed after extensive leak testing in the pilot plant. This was considered necessary to assure no recurrence of gaseous UF/sub 6/ leaks as experienced in Run E-2. In the four additional runs required to complete the program, about 641 kg of fluoride salt containing 40.64 kg of fully enriched uranium was reprocessed. Recovery as UF/sub 6/ product represented 97.97% of the feed, with 0.01% measured losses. An additional 2.14% was reclaimed from NaF beds. The product was of sufficient purity to meet specifications for material designated for reduction to uranium metal. Decontamination from fission products was essentially complete. Calculations based on the entire ARE program indicated 96.38% product recovery, with 0.06% measured losses. An additional 2.50% was reclaimed from NaF beds and equipment washes. (auth)

Whitmarsh, C.L.

1959-08-26T23:59:59.000Z

204

Software/firmware design specification for 10-MWe solar-thermal central-receiver pilot plant  

DOE Green Energy (OSTI)

The software and firmware employed for the operation of the Barstow Solar Pilot Plant are completely described. The systems allow operator control of up to 2048 heliostats, and include the capability of operator-commanded control, graphic displays, status displays, alarm generation, system redundancy, and interfaces to the Operational Control System, the Data Acquisition System, and the Beam Characterization System. The requirements are decomposed into eleven software modules for execution in the Heliostat Array Controller computer, one firmware module for execution in the Heliostat Field Controller microprocessor, and one firmware module for execution in the Heliostat Controller microprocessor. The design of the modules to satisfy requirements, the interfaces between the computers, the software system structure, and the computers in which the software and firmware will execute are detailed. The testing sequence for validation of the software/firmware is described. (LEW)

Ladewig, T.D.

1981-03-01T23:59:59.000Z

205

2007 Annual Mitigation Report for the Waste Isolation Pilot Plant (July 2007)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 MEMORANDUM FOR: JAMES A. RISPOLI ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT THROUGH: DR. INES TRIAY CHIEF OPERATING OFFICER OFFICE OF ENVIRONMENTAL MANAGEMENT FROM: DR. DAVID C. MOODY MANAGER CARLSBAD FIELD OFFICE SUBJECT: 2007 Annual Mitigation Report for the Waste Isolation Pilot Plant DO E Order 451.1 B Change 1 requires you to track and report annually to the Assistant Secretary for Environment, Safety and Health, progress made in implementing and the effectiveness ofmitigation action plans prepared pursuant to the Department's National Environmental Policy Act implementing regulations until mitigation is complete. The 2007 annual report for the WIPP site is attached. In order to avoid duplicating reporting requirements, this mitigation action report does not specifically

206

Enforcement Letter ELWIPP090706, September 8, 2006 Waste Isolation Pilot Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 8, 2006 September 8, 2006 Mr. Richard D. Raaz President and General Manager Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, NM 88221-2078 Subject: Waste Isolation Pilot Plant Enforcement Letter Dear Mr. Raaz: The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-CBFO-WIPP-WIPP-2006-0001. Our evaluation included review of the investigation/causal analysis and discussion with you and other site personnel during an informal conference held on August 1, 2006. The subject NTS report described Quality Assurance (QA) deficiencies associated with the refurbishment of the Super High-Efficiency Neutron Counter (SuperHENC) non-destructive assay system. The SuperHENC had been acquired as excess material

207

A PILOT PLANT FOR THE REDUCTION OF URANIUM HEXAFLUORIDE TO URANIUM TETRAFLUORIDE WITH TRICHLOROETHYLENE  

SciTech Connect

Pilot plant experiments are described in which trichloroethylene was used for the reduction of uranium hexafluoride to uranium tetrafluoride. After unsatisfactory preliminary results with liquid phase reduction, satisfactory results were obtained with a vapor phase reduction system. It was found that vapor phase reduction at approximately 450 deg F, produced a low density product which contained only small quantities of uranium(VI); sintering the uranium tetrafluoride in a hydrogen fluoride atmosphere increased the product density to approximately 3 g/cc. The reduction was essentially complete, and the effluent gas contained less than 1 ppm of uranium hexafluoride. The purity of the uranium tetrafluoride produced was equivalent to that of the uranium hexafluoride used as feed. A complete discussion is given of the operation of the various parts of the system. (auth)

Baker, J.E.; Klaus, H.V.; Schmidt, R.A.; Smiley, S.H.

1956-05-31T23:59:59.000Z

208

Scenario development for the Waste Isolation Pilot Plant: Building confidence in the assessment  

SciTech Connect

Scenario development is part of the iterative performance assessment (PA) process for the Waste Isolation Pilot Plant (WIPP). Scenario development for the WIPP has been the subject of intense external review and is certain to be the subject of continued scrutiny as the project proceeds toward regulatory compliance. The principal means of increasing confidence in this aspect of the PA will be through the use of the systematic and thorough procedure toward developing the scenarios and conceptual models on which the assessment is to be based. Early and ongoing interaction with project reviewers can assist with confidence building. Quality of argument and clarity of presentation in PA will be of key concern. Appropriate tools are required for documenting and tracking assumptions, through a single assessment phase, and between iterative assessment phases. Risks associated with future human actions are of particular concern to the WIPP project, and international consensus on the principles for incorporation of future human actions in assessments would be valuable.

Galson, D.A.; Swift, P.N.

1994-07-01T23:59:59.000Z

209

Solar pilot plant, phase I. Quarterly report No. 1, July--December 1975  

DOE Green Energy (OSTI)

Honeywell Inc. is investigating the technical and economic feasibility of generating electricity from solar energy. During the first 6 months of the program (1 July--31 December 1975), a preliminary design baseline for a 10-MW(e) solar pilot plant was generated and analyzed. Subsequently, several changes were made to improve performance and/or reduce cost. Conceptual designs and research experiments were generated for three key subsystems--collector, steam generator, and thermal storage. Limited testing was done to study the problem of removing eutectic salts from vaporizer tubes in the thermal storage subsystem. The program was on schedule at the end of 1975. Plans for the first quarter of 1976 include ordering long-leadtime items for the subsystem research experiments, continuing analysis of the conceptual designs preparatory to detailing them, and continuing engineering model experiments.

None

1976-02-20T23:59:59.000Z

210

Waste Isolation Pilot Plant Title I operator dose calculations. Final report, LATA report No. 90  

SciTech Connect

The radiation exposure dose was estimated for the Waste Isolation Pilot Plant (WIPP) operating personnel who do the unloading and transporting of the transuranic contact-handled waste. Estimates of the radiation source terms for typical TRU contact-handled waste were based on known composition and properties of the waste. The operations sequence for waste movement and storage in the repository was based upon the WIPP Title I data package. Previous calculations had been based on Conceptual Design Report data. A time and motion sequence was developed for personnel performing the waste handling operations both above and below ground. Radiation exposure calculations were then performed in several fixed geometries and folded with the time and motion studies for individual workers in order to determine worker exposure on an annual basis.

Hughes, P.S.; Rigdon, L.D.

1980-02-01T23:59:59.000Z

211

Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3  

Science Conference Proceedings (OSTI)

This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

Not Available

1993-03-01T23:59:59.000Z

212

10-MWe solar-thermal central-receiver pilot plant: collector subsystem foundation construction. Revision No. 1  

DOE Green Energy (OSTI)

Bid documents are provided for the construction of the collector subsystem foundation of the Barstow Solar Pilot Plant, including invitation to bid, bid form, representations and certifications, construction contract, and labor standards provisions of the Davis-Bacon Act. Instructions to bidders, general provisions and general conditions are included. Technical specifications are provided for the construction. (LEW)

Not Available

1979-12-18T23:59:59.000Z

213

Solar Pilot Plant, Phase I. Preliminary design report. Volume I. Executive overview (approved). CDRL item 2. [10 MW; Barstow, California  

DOE Green Energy (OSTI)

The project goals, program schedules, and preliminary design for the 10 MW central receiver pilot plant at Barstow, California are presented. Details of the collector field, receiver/tower, thermal storage system, electrical power conversion subsystem, and control systems are given. (WHK)

None

1977-08-01T23:59:59.000Z

214

10 MWe solar pilot plant, Daggett, California. Flushing and steam blows preoperational test procedure 980. Revision: 0  

Science Conference Proceedings (OSTI)

Prescribed steps are given for flushing and steam blowing the condenser hotwell, deaerator, inline demineralizers, thermal storage subsystem flash tank, and steam lines of the Barstow Solar Pilot Plant. Included are acceptance criteria, precautions, a list of test equipment, initial conditions, procedures and data collection, and system restoration. (LEW)

Williams, D.L.

1980-01-01T23:59:59.000Z

215

Experience Based Interview Process for Power Plant Management: With a Pilot Application to Aging of Outage Support Equipment  

Science Conference Proceedings (OSTI)

Plant managers are responsible for ensuring that their facilities meet strategic asset management goals in an increasingly competitive power generation marketplace. This report describes an experience based interview (EBI) method for capturing the knowledge of plant staff to more efficiently identify technical or operational issues and make management decisions that protect assets. Included is a demonstration of the method in a pilot application to aging of support equipment that could impact outages in ...

1999-04-05T23:59:59.000Z

216

10-MWe solar-thermal central-receiver pilot plant solar facilities design integration: plant maintenance/training manual (RADL Item 2-37). Section 2. Stationary apparatus  

Science Conference Proceedings (OSTI)

The stationary apparatus for the Barstow Solar Pilot Plant are listed, including: heat exchangers, receiver panels, tanks, vessels, and receivers, deaerator, condenser to the turbine-generator, desuperheaters, filters and strainers, demineralizers, heaters, dryers, separators, ullage gas supply and conditioning, auxiliary boilers, sewage treatment plant, expansion joints, and orifice plates. Specifications, operation and maintenance instructions are given for the heat exchangers, receiver panels, filters and strainers, separators, and especially for the ullage gas supply and conditioning. (LEW)

Not Available

1981-07-01T23:59:59.000Z

217

Catalytic seawater flue gas desulfurization process: an experimental pilot plant study  

SciTech Connect

In previous articles by the authors on seawater S(IV) oxidation kinetics, a significant catalytic effect was demonstrated by means of a commercially available activated carbon. The aims of this study carried out at pilot plant scale were to assess the use of high-efficiency structured packing and to validate the positive results obtained previously in laboratory studies. A comparison between a packed tower and a spray column was made by maintaining the same desulfurization efficiency. A 47% reduction in seawater flow can be obtained with a packed tower. This option seems to be more economical, with a reduction in operation costs of least of 33%. With the appropriate activated carbon, it is possible to reach a greater oxidation rate at a low pH level than by operating conventionally at a high pH level without a catalyst. A preliminary technical and financial comparison between the advanced seawater desulfurization process (equipped with a packed tower and a catalytic oxidation plant) and the conventional process (spray tower and noncatalytic oxidation) was carried out. 18 refs., 4 figs., 4 tabs.

F. Vidal B.; P. Ollero; F.J. Gutierrez Ortiz; A. Villanueva [University of Seville, Seville (Spain). Department of Chemical and Environmental Engineering

2007-10-15T23:59:59.000Z

218

The design and construction of a hot dry rock pilot plant  

SciTech Connect

The geothermal energy program at the Los Alamos National Laboratory is directed toward demonstrating the potential of the hot dry rock (HDR) technology as an alternate energy source. Since the inception of the program, scientists and engineers have perfected drilling and fracturing techniques to create underground reservoirs for the purpose of tapping the potential heat energy from the hot rock in the earth. One of the achievements to date has been the creation of a reservoir at the Laboratory's test site at Fenton Hill, New Mexico. This reservoir, located at a depth of 12,000 feet below the surface of the earth, has an estimated fluid capacity of one million gallons within the large volume of fractured rock. To evaluate the thermal power potential of this reservoir, preparations are currently underway to conduct a test which will entail the circulation of fluid through the reservoir by the injection of water at high pressures. A major part of the preparations involves the building of a demonstration pilot plant. The process concept poses a number of unique technical challenges with regard to the design and construction of the equipment and facilities. This paper reviews the system design and operating features of this plant. 3 refs., 4 figs.

Ponden, R.F.

1991-01-01T23:59:59.000Z

219

DOE/WIPP 02-3196 - Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization, March 19, 2002  

NLE Websites -- All DOE Office Websites (Extended Search)

2-3196 2-3196 Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization (40 CFR § 761.75[c]) March 19, 2002 Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization DOE/WIPP 02-3196 TABLE OF CONTENTS 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 LOCATION OF THE DISPOSAL FACILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.0 DETAILED DESCRIPTION OF THE DISPOSAL FACILITY . . . . . . . . . . . . . . . . . . . 4 4.0 ENGINEERING REPORT ON TECHNICAL STANDARDS FOR CHEMICAL WASTE LANDFILLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 5.0 SAMPLING AND MONITORING EQUIPMENT AND FACILITIES AVAILABLE 6 6.0 EXPECTED WASTE VOLUMES OF PCB/TRU WASTE . . . . . . . . . . . . . . . . . . . . 7 7.0 GENERAL DESCRIPTION OF WASTE MATERIALS OTHER THAN PCBS . . . . 8 8.0 DISPOSAL FACILITY OPERATIONS PLAN

220

Report to Congress on the Use of the Waste Isolation Pilot Plant to Develop and Demonstrate Transparency Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

the the Use of the Waste Isolation Pilot Plant to Develop and Demonstrate Transparency Technologies Introduction This report describes the Department of Energy's plan for evaluating the use of the Waste Isolation Pilot Plant (WIPP) repository system to develop transparency technologies. This report fulfills the requirement of Senate Report 106-50 on the National Defense Authorization Act for Fiscal Year 2000 for the Department of Energy (DOE) to develop a plan to establish a nuclear waste disposal demonstration test bed facility. Congressional Request In Report 106-50 the Senate Armed Services Committee directed DOE to develop a plan to establish a demonstration and training program using the WIPP repository system as a test bed facility to develop transparent monitoring technologies for waste storage

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Solar Pilot Plant Phase I, detailed design report: thermal storage subsystem research experiment. CDRL Item No. 8 (Approved)  

DOE Green Energy (OSTI)

The Thermal Storage Subsystem Research Experiment is designed to give maximum information for evaluating the design, performance, and operating parameters of the Barstow Solar Pilot Plant. The experiment is summarized, and the experiment components detail design and integration are described. The experiment test and operation is described which is designed to collect engineering data to allow the design, performance, and operational characteristics to be specified for the Pilot Plant. Appended are: design documentation; pressure drop calculations; materials studies for thermal energy storage; flow charts for data acquisition and control; condenser detail design; instrumentation error analysis; logic diagrams for the control system; literature survey to evaluate the two-phase forced convection heat transfer; and the vaporizer performance model. (LEW)

Not Available

1976-09-17T23:59:59.000Z

222

Waste Isolation Pilot Plant site environmental report, for calendar year 1995  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

NONE

1996-09-01T23:59:59.000Z

223

Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 2, Technical basis  

Science Conference Proceedings (OSTI)

Before disposing of transuranic radioactive waste in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments (PAs) of the WIPP for the DOE to provide interim guidance while preparing for a final compliance evaluation. This volume, Volume 2, contains the technical basis for the 1992 PA. Specifically, it describes the conceptual basis for consequence modeling and the PA methodology, including the selection of scenarios for analysis, the determination of scenario probabilities, and the estimation of scenario consequences using a Monte Carlo technique and a linked system of computational models. Additional information about the 1992 PA is provided in other volumes. Volume I contains an overview of WIPP PA and results of a preliminary comparison with the long-term requirements of the EPA`s Environmental Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B). Volume 3 contains the reference data base and values for input parameters used in consequence and probability modeling. Volume 4 contains uncertainty and sensitivity analyses related to the preliminary comparison with 40 CFR 191B. Volume 5 contains uncertainty and sensitivity analyses of gas and brine migration for undisturbed performance. Finally, guidance derived from the entire 1992 PA is presented in Volume 6.

Not Available

1992-12-01T23:59:59.000Z

224

TRU waste acceptance criteria for the Waste Isolation Pilot Plant: Revision 3  

SciTech Connect

This document is intended to delineate the criteria by which unclassified waste will be accepted for emplacement at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and describe the bases upon which these criteria were established. These criteria are not intended to be specifications but rather limits that will allow waste generating and shipping sites to develop their own procedures and specifications for preparation of TRU waste for shipment to the WIPP. These criteria will also allow waste generating sites to plan future facilities for waste preparation that will produce TRU waste forms compatible with WIPP waste emplacement and isolation requirements. These criteria only apply to contract-handled (CH) and remote-handled (RH) transuranic (TRU) waste forms and are not intended to apply to beta-gamma wastes, spent fuel, high-level waste (HLW), low-level waste (LLW), low specific activity (LSA) waste, or forms of radioactive waste for experimental purposes. Specifications for receipt of experimental waste forms will be prepared by the responsible projects in conjunction with the staff of the WIPP project at a later date. In addition, these criteria only apply to waste emplaced in bedded rock salt. Technical bases for these criteria may differ significantly from those for other host rocks. 25 refs. 4 figs., 1 tab.

1989-01-01T23:59:59.000Z

225

Preparations and Planning for EPA Recertification of the Waste Isolation Pilot Plant  

SciTech Connect

The Waste Isolation Pilot Plant (WIPP) Recertification Project was established to meet the requirement of the WIPP Land Withdrawal Act (LWA)1 to demonstrate continued compliance with U.S. Environmental Protection Agency (EPA) disposal regulations at five-year intervals. This paper delineates the objective of the first recertification effort, sets out project goals, and establishes guiding assumptions. It describes the overall direction for a highly complex and interdependent set of tasks leading to recertification of the WIPP repository in 2004. This paper also lays out a high-level schedule for producing the WIPP Compliance Recertification Application (CRA). The major principle behind recertification is that the EPA recertification decision will not involve rulemaking or judicial review. To ensure that the EPA is able to retain this principle, the U.S. Department of Energy (DOE) will not be incorporating changes through the recertification process. Only changes previously approved by the EPA will be included in the CRA. The EPA can approve significant changes to the current WIPP Certification through rulemaking. Non-significant changes are approved without rulemaking through the planned change reporting process [Title 40 Code of Federal Regulations (CFR), Section 194.4(b)].

Casey, S. C.; Shoemaker, P. E.; Patterson, R. L.

2002-02-25T23:59:59.000Z

226

Basic data report for drillholes at the H-11 complex (Waste Isolation Pilot Plant-WIPP)  

Science Conference Proceedings (OSTI)

Drillholes H-11b1, H-11b2, and H-11b3 were drilled from August to December 1983 for site characterization and hydrologic studies of the Culebra Dolomite Member of the Upper Permian Rustler Formation at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. In October 1984, the three wells were subjected to a series of pumping tests designed to develop the wells, provide information on hydraulic communication between the wells, provide hydraulic properties information, and to obtain water samples for quality of water measurements. Based on these tests, it was determined that this location would provide an excellent pad to conduct a convergent-flow non-sorbing tracer test in the Culebra dolomite. In 1988, a fourth hole (H-11b4) was drilled at this complex to provide a tracer-injection hole for the H-11 convergent-flow tracer test and to provide an additional point at which the hydraulic response of the Culebra H-11 multipad pumping test could be monitored. A suite of geophysical logs was run on the drillholes and was used to identify different lithologies and aided in interpretation of the hydraulic tests. 4 refs., 6 figs., 6 tabs.

Mercer, J.W. (Sandia National Labs., Albuquerque, NM (USA)); Snyder, R.P. (Geological Survey, Denver, CO (USA))

1990-05-01T23:59:59.000Z

227

Interpretations of Tracer Tests Performed in the Culebra Dolomite at the Waste Isolation Pilot Plant Site  

Science Conference Proceedings (OSTI)

This report provides (1) an overview of all tracer testing conducted in the Culebra Dolomite Member of the Rustler Formation at the Waste Isolation Pilot Plant (WPP) site, (2) a detailed description of the important information about the 1995-96 tracer tests and the current interpretations of the data, and (3) a summary of the knowledge gained to date through tracer testing in the Culebra. Tracer tests have been used to identify transport processes occurring within the Culebra and quantify relevant parameters for use in performance assessment of the WIPP. The data, especially those from the tests performed in 1995-96, provide valuable insight into transport processes within the Culebra. Interpretations of the tracer tests in combination with geologic information, hydraulic-test information, and laboratory studies have resulted in a greatly improved conceptual model of transport processes within the Culebra. At locations where the transmissivity of the Culebra is low ( 4 x 10{sup -6} m{sup 2}/s), we conceptualize the Culebra as a heterogeneous, layered, fractured medium in which advection occurs largely through fractures and solutes diffuse between fractures and matrix at multiple rates. The variations in diffusion rate can be attributed to both variations in fracture spacing (or the spacing of advective pathways) and matrix heterogeneity. Flow and transport appear to be concentrated in the lower Culebra. At all locations, diffusion is the dominant transport process in the portions of the matrix that tracer does not access by flow.

MEIGS,LUCY C.; BEAUHEIM,RICHARD L.; JONES,TOYA L.

2000-08-01T23:59:59.000Z

228

Consideration of nuclear criticality when disposing of transuranic waste at the Waste Isolation Pilot Plant  

Science Conference Proceedings (OSTI)

Based on general arguments presented in this report, nuclear criticality was eliminated from performance assessment calculations for the Waste Isolation Pilot Plant (WIPP), a repository for waste contaminated with transuranic (TRU) radioisotopes, located in southeastern New Mexico. At the WIPP, the probability of criticality within the repository is low because mechanisms to concentrate the fissile radioisotopes dispersed throughout the waste are absent. In addition, following an inadvertent human intrusion into the repository (an event that must be considered because of safety regulations), the probability of nuclear criticality away from the repository is low because (1) the amount of fissile mass transported over 10,000 yr is predicted to be small, (2) often there are insufficient spaces in the advective pore space (e.g., macroscopic fractures) to provide sufficient thickness for precipitation of fissile material, and (3) there is no credible mechanism to counteract the natural tendency of the material to disperse during transport and instead concentrate fissile material in a small enough volume for it to form a critical concentration. Furthermore, before a criticality would have the potential to affect human health after closure of the repository--assuming that a criticality could occur--it would have to either (1) degrade the ability of the disposal system to contain nuclear waste or (2) produce significantly more radioisotopes than originally present. Neither of these situations can occur at the WIPP; thus, the consequences of a criticality are also low.

RECHARD,ROBERT P.; SANCHEZ,LAWRENCE C.; STOCKMAN,CHRISTINE T.; TRELLUE,HOLLY R.

2000-04-01T23:59:59.000Z

229

Temperature control in a 30 stage, 5-cm Centrifugal Contactor Pilot Plant  

Science Conference Proceedings (OSTI)

Temperature profile testing was performed using a 30 stage 5-cm centrifugal contactor pilot plant. These tests were performed to evaluate the ability to control process temperature by adjusting feed solution temperatures. This would eliminate the need for complex jacketed heat exchanger installation on the centrifugal contactors. Thermocouples were installed on the inlet and outlets of each stage, as well as directly in the mixing zone of several of the contactor stages. Lamp oil, a commercially available alkane mixture of C14 to C18 chains, and tap water adjusted to pH 2 with nitric acid were the solution feeds for the temperature profile testing. Temperature data profiles for an array of total throughputs and contactor rpm values for both single-phase and two-phase systems were collected with selected profiles. The total throughput ranged from 0.5-1.4 L/min with rotor speeds from 3500-4000 rpm. Inlet solution temperatures ranging from ambient up to 50 C were tested. Results of the two-phase temperature profile testing are detailed

Jack D. Law; Troy G. Garn; David H. Meikrantz

2009-09-01T23:59:59.000Z

230

Historical Background on Assessment the Performance of the Waste Isolation Pilot Plant  

SciTech Connect

In 1979, six years after selecting the Delaware Basin as a potential disposal area, Congress authorized the US Department of Energy to build the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, as a research and development facility for the safe management, storage, and disposal of waste contaminated with transuranic radioisotopes. In 1998, 19 years after authorization and 25 years after site selection, the US Environmental Protection Agency (EPA) certified that the WIPP disposal system complied with its regulations. The EPA's decision was primarily based on the results from a performance assessment conducted in 1996. This performance assessment was the culmination of four preliminary performance assessments conducted between 1989 and 1992. This report provides a historical setting and context for how the performance of the deep geologic repository at the WIPP was analyzed. Also included is background on political forces acting on the project. For example, the federal requirement to provide environmental impact statements and negotiated agreements with the State of New Mexico influenced the type of scientific areas that were investigated and the engineering analysis prior to 1989 for the WIPP.

Rechard, R.P.

1999-06-01T23:59:59.000Z

231

Actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP): FY94 results  

SciTech Connect

This document contains six reports on actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP). These reports, completed in FY94, are relevant to the estimation of the potential dissolved actinide concentrations in WIPP brines under repository breach scenarios. Estimates of potential dissolved actinide concentrations are necessary for WIPP performance assessment calculations. The specific topics covered within this document are: the complexation of oxalate with Th(IV) and U(VI); the stability of Pu(VI) in one WIPP-specific brine environment both with and without carbonate present; the solubility of Nd(III) in a WIPP Salado brine surrogate as a function of hydrogen ion concentration; the steady-state dissolved plutonium concentrations in a synthetic WIPP Culebra brine surrogate; the development of a model for Nd(III) solubility and speciation in dilute to concentrated sodium carbonate and sodium bicarbonate solutions; and the development of a model for Np(V) solubility and speciation in dilute to concentrated sodium Perchlorate, sodium carbonate, and sodium chloride media.

Novak, C.F. [ed.

1995-08-01T23:59:59.000Z

232

Decontamination of industrial cyanide-containing water in a solar CPC pilot plant  

Science Conference Proceedings (OSTI)

The aim of this work was to improve the quality of wastewater effluent coming from an Integrated Gasification Combined-Cycle (IGCC) power station to meet with future environmental legislation. This study examined a homogeneous photocatalytic oxidation process using concentrated solar UV energy (UV/Fe(II)/H{sub 2}O{sub 2}) in a Solar Compound Parabolic Collector (CPC) pilot plant. The efficiency of the process was evaluated by analysis of the oxidation of cyanides and Total Organic Carbon (TOC). A factorial experimental design allowed the determination of the influences of operating variables (initial concentration of H{sub 2}O{sub 2}, oxalic acid and Fe(II) and pH) on the degradation kinetics. Temperature and UV-A solar power were also included in the Neural Network fittings. The pH was maintained at a value >9.5 during cyanide oxidation to avoid the formation of gaseous HCN and later lowered to enhance mineralization. Under the optimum conditions ([H{sub 2}O{sub 2}] = 2000 ppm, [Fe(II)] = 8 ppm, pH = 3.3 after cyanide oxidation, and [(COOH){sub 2}] = 60 ppm), it was possible to degrade 100% of the cyanides and up to 92% of Total Organic Carbon. (author)

Duran, A.; Monteagudo, J.M.; San Martin, I.; Aguirre, M. [Grupo IMAES, Department of Chemical Engineering, Escuela Tecnica Superior de Ingenieros Industriales, University of Castilla-La Mancha, Avda. Camilo Jose Cela 3, 13071 Ciudad Real (Spain)

2010-07-15T23:59:59.000Z

233

Analysis and prevention of metallurgical failures at a major direct coal liquefaction pilot plant  

Science Conference Proceedings (OSTI)

The H-Coal Pilot Plant in Catlettsburg, KY was the largest-capacity direct coal liquefaction project operating in the United States. Since the start of operations, performance of its components was carefully monitored and occasional failures were examined and documented. The results of the examinations were used to develop remedial steps and improve the design of scale-up units. In this paper, the metallurgical aspects of the following incidents will be described: 1) stress corrosion cracking of martensitic stainless steel bolting on the waterside of a heat exchanger; 2) stress corrosion cracking of a superalloy seal ring; 3) brittle failure of a low alloy nut in a block valve body; 4) corrosion damage in the fractionator and side stripper; 5) erosion/corrosion of a coal liquid transfer line in the atmospheric fractionation area; 6) pitting corrosion in a deaerator carbon steel inlet pipe; 7) brittle failure of a martensitic stainless steel ball in a block valve handling coal liquids; and 8) cracking of cobalt-base alloy seat rings in block valve applications. In addition, remedial steps and preventive measures leading to successful performance after repair are briefly described.

Sagues, A.A.; Ganesan, P.; Ragle, H.V.; Searles, R.C.; Sethi, V.K.

1984-09-01T23:59:59.000Z

234

Incorporating long-term climate change in performance assessment for the Waste Isolation Pilot Plant  

SciTech Connect

The United States Department of Energy (DOE) is developing the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico for the disposal of transuranic wastes generated by defense programs. Applicable regulations (40 CFR 191) require the DOE to evaluate disposal-system performance for 10,000 yr. Climatic changes may affect performance by altering groundwater flow. Paleoclimatic data from southeastern New Mexico and the surrounding area indicate that the wettest and coolest Quaternary climate at the site can be represented by that at the last glacial maximum, when mean annual precipitation was approximately twice that of the present. The hottest and driest climates have been similar to that of the present. The regularity of global glacial cycles during the late Pleistocene confirms that the climate of the last glacial maximum is suitable for use as a cooler and wetter bound for variability during the next 10,000 yr. Climate variability is incorporated into groundwater-flow modeling for WIPP PA by causing hydraulic head in a portion of the model-domain boundary to rise to the ground surface with hypothetical increases in precipitation during the next 10,000 yr. Variability in modeled disposal-system performance introduced by allowing head values to vary over this range is insignificant compared to variability resulting from other causes, including incomplete understanding of transport processes. Preliminary performance assessments suggest that climate variability will not affect regulatory compliance.

Swift, P.N. [Sandia National Labs., Albuquerque, NM (United States); Baker, B.L. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States); Economy, K. [Ecodynamics Research Associates, Albuquerque, NM (United States); Garner, J.W. [Applied Physics, Inc., Albuquerque, NM (United States); Helton, J.C. [Arizona State Univ., Tempe, AZ (United States); Rudeen, D.K. [New Mexico Engineering Research Inst., Albuquerque, NM (United States)

1993-09-18T23:59:59.000Z

235

Waste Isolation Pilot Plant site environmental report for calendar year 1994  

SciTech Connect

US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site.

NONE

1995-06-01T23:59:59.000Z

236

Blending mining and nuclear industries at the Waste Isolation Pilot Plant  

SciTech Connect

At the Waste Isolation Pilot Plant (WIPP) traditional procedures for underground mining activities have been significantly altered in order to assure underground safety and project adherence to numerous regulatory requirements. Innovative techniques have been developed for WIPP underground procedures, mining equipment, and operating environments. The mining emphasis at WIPP is upon the quality of the excavation, not (as in conventional mines) on the production of ore. The WIPP is a United States Department of Energy (DOE) project that is located 30 miles southeast of Carlsbad, New Mexico, where the nation's first underground engineered nuclear repository is being constructed. The WIPP site was selected because of its location amidst a 607 meter thick salt bed, which provides a remarkably stable rock formation for the permanent storage of nuclear waste. The underground facility is located 655 meters below the earth's surface, in the Salado formation, which comprises two-hundred million year old halites with minor amounts of clay and anhydrites. When completed, the WIPP underground facility will consist of two components: approximately 81 square kilometers of experimental areas, and approximately 405 square kilometers of repository. 3 figs.

Walls, J.R.

1990-01-01T23:59:59.000Z

237

Initial Assessment of Sulfur-Iodine Process Safety Issues and How They May Affect Pilot Plant Design and Operation  

DOE Green Energy (OSTI)

The sulfur-iodine process to make hydrogen by the thermochemical splitting of water is under active development as part of a U.S. Department of Energy program. An integrated lab scale system is currently being designed and built. The next planned stage of development is a pilot plant with a thermal input of about 500 kW, equivalent to about 30,000 standard liters per hour of hydrogen production. The sulfur-iodine process contains a variety of hazards, including temperatures up to 850 C and hazardous chemical species including SO2, H2SO4, HI, I2, and of course H2. The siting and design of a pilot plant must consider these and other hazards. This report presents an initial analysis of the hazards that might affect pilot plant design and should be considered in the initial planning. The general hazards that have been identified include reactivity, flammability, toxicity, pressure, electrical hazards, and industrial hazards such as lifting and rotating equipment. Personnel exposure to these hazards could occur during normal operations, which includes not only running the process at the design conditions but also initial inventory loading, heatup, startup, shutdown, and system flushing before equipment maintenance. Because of the complexity and severity of the process, these ancillary operations are expected to be performed frequently. In addition, personnel could be exposed to the hazards during various abnormal situations which could include unplanned phase changes of liquids or solids, leaks of process fluids or cooling water into other process streams, unintentional introducion of foreign species into the process, and unexpected side reactions. Design of a pilot plant will also be affected by various codes and regulations such as the International Building Code, the International Fire Code, various National Fire Protection Association Codes, and the Emergency Planning and Community Right-to-Know Act.

Robert S. Cherry

2006-09-01T23:59:59.000Z

238

Draft forecast of the final report for the comparison to 40 CFR Part 191, Subpart B, for the Waste Isolation Pilot Plant  

Science Conference Proceedings (OSTI)

The United States Department of Energy is planning to dispose of transuranic wastes, which have been generated by defense programs, at the Waste Isolation Pilot Plant. The WIPP Project will assess compliance with the requirements of the United States Environmental Protection Agency. This report forecasts the planned 1992 document, Comparison to 40 CFR, Part 191, Subpart B, for the Waste Isolation Pilot Plant (WIPP). 130 refs., 36 figs., 11 tabs.

Bertram-Howery, S.G.; Marietta, M.G.; Anderson, D.R.; Gomez, L.S.; Rechard, R.P. (Sandia National Labs., Albuquerque, NM (USA)); Brinster, K.F.; Guzowski, R.V. (Science Applications International Corp., Albuquerque, NM (USA))

1989-12-01T23:59:59.000Z

239

Solar Pilot Plant, Phase I. Preliminary design report. Volume II. System description and system analysis. CDRL item 2  

DOE Green Energy (OSTI)

Honeywell conducted a parametric analysis of the 10-MW(e) solar pilot plant requirements and expected performance and established an optimum system design. The main analytical simulation tools were the optical (ray trace) and the dynamic simulation models. These are described in detail in Books 2 and 3 of this volume under separate cover. In making design decisions, available performance and cost data were used to provide a design reflecting the overall requirements and economics of a commercial-scale plant. This volume contains a description of this analysis/design process and resultant system/subsystem design and performance.

None

1977-05-01T23:59:59.000Z

240

Waste Isolation PIlot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 1  

SciTech Connect

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2005, to June 30, 2006. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

Washington TRU Solutions LLC

2006-04-03T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1  

SciTech Connect

This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2004, to June 30, 2005. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the Geomechanical Monitoring Program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists the references and bibliography.

Washington TRU Solutions LLC

2006-04-03T23:59:59.000Z

242

Interpretations of Tracer Tests Performed in the Culebra Dolomite at the Waste Isolation Pilot Plant Site  

SciTech Connect

This report provides (1) an overview of all tracer testing conducted in the Culebra Dolomite Member of the Rustler Formation at the Waste Isolation Pilot Plant (WPP) site, (2) a detailed description of the important information about the 1995-96 tracer tests and the current interpretations of the data, and (3) a summary of the knowledge gained to date through tracer testing in the Culebra. Tracer tests have been used to identify transport processes occurring within the Culebra and quantify relevant parameters for use in performance assessment of the WIPP. The data, especially those from the tests performed in 1995-96, provide valuable insight into transport processes within the Culebra. Interpretations of the tracer tests in combination with geologic information, hydraulic-test information, and laboratory studies have resulted in a greatly improved conceptual model of transport processes within the Culebra. At locations where the transmissivity of the Culebra is low (< 4 x 10{sup -6} m{sup 2}/s), we conceptualize the Culebra as a single-porosity medium in which advection occurs largely through the primary porosity of the dolomite matrix. At locations where the transmissivity of the Culebra is high (> 4 x 10{sup -6} m{sup 2}/s), we conceptualize the Culebra as a heterogeneous, layered, fractured medium in which advection occurs largely through fractures and solutes diffuse between fractures and matrix at multiple rates. The variations in diffusion rate can be attributed to both variations in fracture spacing (or the spacing of advective pathways) and matrix heterogeneity. Flow and transport appear to be concentrated in the lower Culebra. At all locations, diffusion is the dominant transport process in the portions of the matrix that tracer does not access by flow.

MEIGS,LUCY C.; BEAUHEIM,RICHARD L.; JONES,TOYA L.

2000-08-01T23:59:59.000Z

243

Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho  

DOE Green Energy (OSTI)

The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

Not Available

1979-09-01T23:59:59.000Z

244

Support and control system of the Waste Isolation Pilot Plant gas generation experiment glovebox  

SciTech Connect

A glovebox was designed and fabricated to house test containers loaded with contact handled transuranic (CH-TRU) waste. The test containers were designed to simulate the environmental characteristics of the caverns at the Waste Isolation Pilot Plant (WIPP). The support and control systems used to operate and maintain the Gas Generation Experiment (GGE) include the following: glovebox atmosphere and pressure control, test container support, glovebox operation support, and gas supply and exhaust systems. The glovebox atmosphere and pressure control systems consist of various components used to control both the pressure and quality of the argon atmosphere inside the glovebox. The glovebox pressure is maintained by three separate pressure control systems. The primary pressure control system is designed to maintain the glovebox at a negative pressure with the other two control systems serving as redundant safety backups. The quality of the argon atmosphere is controlled using a purifying bed system that removes oxygen and moisture. Glovebox atmosphere contaminants that are monitored on a continuous or periodic basis include moisture, oxygen, and nitrogen. The gas generation experiment requires the test containers to be filled with brine, leak tested, maintained at a constant temperature, and the gas head space of the test container sampled on a periodic basis. Test container support systems consisting of a brine addition system, leak test system, heating system, and gas sampling system were designed and implemented. A rupture disk system was constructed to provide pressure relief to the test containers. Operational requirements stipulated that test container temperature and pressure be monitored and collected on a continuous basis. A data acquisition system (DAS) was specifically designed to meet these requirements.

Benjamin, W.W.; Knight, C.J.; Michelbacher, J.A.; Rosenberg, K.E.

1997-09-01T23:59:59.000Z

245

Test container design/fabrication/function for the Waste Isolation Pilot Plant gas generation experiment glovebox  

SciTech Connect

The gas generation experiments (GGE) are being conducted at Argonne National Laboratory-West (ANL0W) with contact handled transuranic (CH-TRU) waste in support of the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The purpose of the GGE is to determine the different quantities and types of gases that would be produced and the gas-generation rates that would develop if brine were introduced to CH-TRU waste under post-closure WIPP disposal room conditions. The experiment requires that a prescribed matrix of CH-TRU waste be placed in a 7.5 liter test container. After loaded with the CH-TRU waste, brine and inoculum mixtures (consisting of salt and microbes indigenous to the Carlsbad, New Mexico region) are added to the waste. The test will run for an anticipated time period of three to five years. The test container itself is an ASME rated pressure vessel constructed from Hastelloy C276 to eliminate corrosion that might contaminate the experimental results. The test container is required to maintain a maximum 10% head space with a maximum working pressure of 17.25 MPa (2,500 psia). The test container is designed to provide a gas sample of the head space without the removal of brine. Assembly of the test container lid and process valves is performed inside an inert atmosphere glovebox. Glovebox mockup activities were utilized from the beginning of the design phase to ensure the test container and associated process valves were designed for remote handling. In addition, test container processes (including brine addition, sparging, leak detection, and test container pressurization) are conducted inside the glovebox.

Knight, C.J.; Russell, N.E.; Benjamin, W.W.; Rosenberg, K.E.; Michelbacher, J.A.

1997-09-01T23:59:59.000Z

246

An appraisal of the 1992 preliminary performance assessment for the Waste Isolation Pilot Plant  

SciTech Connect

The purpose of the New Mexico Environmental Evaluation Group is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The Environmental Evaluation Group (EEG) has reviewed the WIPP 1992 Performance Assessment (Sandia WIPP Performance Assessment Department, 1992). Although this performance assessment was released after the October 1992 passage of the WIPP Land Withdrawal Act (PL 102-579), the work preceded the Act. For individual and ground-water protection, calculations have been done for 1000 years post closure, whereas the US Environmental Protection Agency`s Standards (40 CFR 191) issued in 1993 require calculations for 10,000 years. The 1992 Performance Assessment continues to assimilate improved understanding of the geology and hydrogeology of the site, and evolving conceptual models of natural barriers. Progress has been made towards assessing WIPP`s compliance with the US Environmental Protection Agency`s Standards (40 CFR 191). The 1992 Performance Assessment has addressed several items of major concern to EEG, outlined in the July 1992 review of the 1991 performance assessment (Neill et al., 1992). In particular, the authors are pleased that some key results in this performance assessment deal with sensitivity of the calculated complementary cumulative distribution functions (CCDF) to alterative conceptual models proposed by EEG -- that flow in the Culebra be treated as single-porosity fracture-flow; with no sorption retardation unless substantiated by experimental data.

Lee, W.W.L.; Chaturvedi, L.; Silva, M.K.; Weiner, R.; Neill, R.H. [Environmental Evaluation Group, Albuquerque, NM (United States)]|[Environmental Evaluation Group, Carlsbad, NM (United States)

1994-09-01T23:59:59.000Z

247

NO{sub x} Abatement Pilot Plant 90-day test results report  

SciTech Connect

High-level radioactive liquid wastes produced during nuclear fuel reprocessing at the Idaho Chemical Processing Plant are calcined in the New Waste Calcining Facility (NWCF) to provide both volume reduction and a more stable waste form. Because a large component of the HLW is nitric acid, high levels of oxides of nitrogen (NO{sub x}) are produced in the process and discharged to the environment via the calciner off-gas. The NO{sub x} abatement program is required by the new Fuel Processing Restoration (FPR) project permit to construct to reduce NO{sub x} emissions from the NWCF. Extensive research and development has indicated that the selective catalytic reduction (SCR) process is the most promising technology for treating the NWCF off-gas. Pilot plant tests were performed to determine the compatibility of the SCR process with actual NWCF off-gas. Test results indicate that the SCR process is a viable method for abating the NO{sub x} from the NWCF off-gas. Reduction efficiencies over 95% can be obtained, with minimal amounts of ammonia slip, provided favorable operating conditions exist. Two reactors operated with series flow will provide optimum reduction capabilities. Typical operation should be performed with a first reactor stage gas space velocity of 20,000 hr{sup {minus}1} and an inlet temperature of 320{degrees}C. The first stage exhaust NO{sub x} concentration will then dictate the parameter settings for the second stage. Operation should always strive for a peak reactor temperature of 520{degrees}C in both reactors, with minimal NH{sub 3} slip from the second reactor. Frequent fluctuations in the NWCF off-gas NO{sub x} concentration will require a full-scale reduction facility that is versatile and quick-responding. Sudden changes in NWCF off-gas NO{sub x} concentrations will require quick detection and immediate response to avoid reactor bed over-heating and/or excessive ammonia slip.

McCray, J.A.; Boardman, R.D. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1991-08-30T23:59:59.000Z

248

Solar Pilot Plant, Phase I. Preliminary design report. Volume VI. Electrical power generation; master control subsystems; balance of plant CDRL item 2  

DOE Green Energy (OSTI)

The Honeywell electrical power generation subsystem centers on a General Electric dual admission, triple extraction turbine generator sized to the output requirements of the Pilot Plant. The turbine receives steam from the receiver subsystem and/or the thermal storage subsystem and supplies those subsystems with feedwater. The turbine condensor is wet cooled. The plant control system consists of a coordinated digital master and subsystem digital/analog controls. The remainder of the plant, work spaces, maintenance areas, roads, and reception area are laid out to provide maximum convenience compatible with utility and safety. Most of the activities are housed in a complex around the base of the receiver tower. This volume contains a description of the relationship of the electrical power generation subsystem to the rest of the plant, the design methodology and evolution, the interface integration and control, and the operation and maintenance procedures.

None

1977-05-01T23:59:59.000Z

249

Central receiver solar thermal power system, Phase 1. CDRL item 2. Pilot plant preliminary design report. Volume VI. Electrical power generation and master control subsystems and balance of plant  

DOE Green Energy (OSTI)

The requirements, performance, and subsystem configuration for both the Commercial and Pilot Plant electrical power generation subsystems (EPGS) and balance of plants are presented. The EPGS for both the Commercial Plant and Pilot Plant make use of conventional, proven equipment consistent with good power plant design practices in order to minimize risk and maximize reliability. The basic EPGS cycle selected is a regenerative cycle that uses a single automatic admission, condensing, tandem-compound double-flow turbine. Specifications, performance data, drawings, and schematics are included. (WHK)

Hallet, Jr., R. W.; Gervais, R. L.

1977-10-01T23:59:59.000Z

250

A Pilot Study for the Extraction and Treatment of Groundwater From a Manufactured Gas Plant Site  

Science Conference Proceedings (OSTI)

This report describes a pilot study of groundwater remediation at a former MGP site. The project included hydrogeologic investigations, bench- and pilot-scale treatability studies, and a cost analysis. The report documents influent and effluent levels of contaminants in groundwaters classified as high-strength, medium-strength, and low-strength, depending on the degree of contamination. Detailed descriptions of the treatment systems and practical observations are also included.

1997-12-19T23:59:59.000Z

251

MBM fuel feeding system design and evaluation for FBG pilot plant  

Science Conference Proceedings (OSTI)

Highlights: Black-Right-Pointing-Pointer A 1-5 g/s fuel feeding system for pilot scale FBG was designed, built and tested. Black-Right-Pointing-Pointer Multiple conveying stages improve pressure balancing, flow control and stability. Black-Right-Pointing-Pointer Secondary conveyor stage reduced output irregularity from 47% to 15%. Black-Right-Pointing-Pointer Pneumatic air sparging effective in dealing with poor flow ability of MBM powder. Black-Right-Pointing-Pointer Pneumatic injection port plugs with char at gasification temperature of 850 Degree-Sign C. - Abstract: A biomass fuel feeding system has been designed, constructed and evaluated for a fluidized bed gasifier (FBG) pilot plant at the University of Saskatchewan (Saskatoon, SK, Canada). The system was designed for meat and bone meal (MBM) to be injected into the gasifier at a mass flow-rate range of 1-5 g/s. The designed system consists of two stages of screw conveyors, including a metering stage which controlled the flow-rate of fuel, a rotary airlock and an injection conveyor stage, which delivered that fuel at a consistent rate to the FBG. The rotary airlock which was placed between these conveyors, proved unable to maintain a pressure seal, thus the entire conveying system was sealed and pressurized. A pneumatic injection nozzle was also fabricated, tested and fitted to the end of the injection conveyor for direct injection and dispersal into the fluidized bed. The 150 mm metering screw conveyor was shown to effectively control the mass output rate of the system, across a fuel output range of 1-25 g/s, while the addition of the 50 mm injection screw conveyor reduced the irregularity (error) of the system output rate from 47% to 15%. Although material plugging was found to be an issue in the inlet hopper to the injection conveyor, the addition of air sparging ports and a system to pulse air into those ports was found to successfully eliminate this issue. The addition of the pneumatic injection nozzle reduced the output irregularity further to 13%, with an air supply of 50 slpm as the minimum air supply to drive this injector. After commissioning of this final system to the FBG reactor, the injection nozzle was found to plug with char however, and was subsequently removed from the system. Final operation of the reactor continues satisfactorily with the two screw conveyors operating at matching pressure with the fluidized bed, with the output rate of the system estimated based on system characteristic equations, and confirmed by static weight measurements made before and after testing. The error rate by this method is reported to be approximately 10%, which is slightly better than the estimated error rate of 15% for the conveyor system. The reliability of this measurement prediction method relies upon the relative consistency of the physical properties of MBM with respect to its bulk density and feeding characteristics.

Campbell, William A., E-mail: bill.campbell@usask.ca [Fluidization Laboratory of Saskatchewan (FLASK) (Canada) and Department of Chemical and Biological Engineering, University of Saskatchewan (Canada); Fonstad, Terry [Department of Chemical and Biological Engineering, University of Saskatchewan (Canada); Pugsley, Todd [Suncor Energy Inc., Calgary, Alberta (Canada); Gerspacher, Regan [Fluidization Laboratory of Saskatchewan (FLASK) (Canada); Department of Chemical and Biological Engineering, University of Saskatchewan (Canada)

2012-06-15T23:59:59.000Z

252

The use of mathematical modeling and pilot plant testing to develop a new biological phosphorus and nitrogen removal process  

Science Conference Proceedings (OSTI)

A mechanistic mathematical model for carbon oxidation, nitrogen removal, and enhanced biological phosphorus removal was used to develop the Step Bio-P process, a new biological phosphorus and nitrogen removal process with a step-feed configuration. A 9,000-L pilot plant with diurnally varying influent process loading rates was operated to verify the model results and to optimize the Step Bio-P process for application at the lethbridge, Alberta, Canada, wastewater treatment plant. The pilot plant was operated for 10 months. An automatic on-line data acquisition system with multiple sampling and metering points for dissolved oxygen, mixed liquor suspended solids, ammonia-nitrogen, nitrate-nitrogen, ortho-phosphate, and flow rates was used. A sampling program to obtain off-line data was carried out to verify the information from the on-line system and monitor additional parameters. The on-line and off-line data were used to recalibrate the model, which was used as an experimental design and process optimization tool.

Nolasco, D.A.; Daigger, G.T.; Stafford, D.R.; Kaupp, D.M.; Stephenson, J.P.

1998-09-01T23:59:59.000Z

253

Arsenic pilot plant operation and results - Socorro Springs, New Mexico - phase 1.  

Science Conference Proceedings (OSTI)

Sandia National Laboratories (SNL) is conducting pilot scale evaluations of the performance and cost of innovative water treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The first pilot tests have been conducted in New Mexico where over 90 sites that exceed the new MCL have been identified by the New Mexico Environment Department. The pilot test described in this report was conducted in Socorro New Mexico between January 2005 and July 2005. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The Sandia National Laboratories pilot demonstration at the Socorro Springs site obtained arsenic removal performance data for five different adsorptive media under constant ambient flow conditions. Well water at Socorro Springs has approximately 42 ppb arsenic in the oxidized (arsenate-As(V)) redox state with moderate amounts of silica, low concentrations of iron and manganese and a slightly alkaline pH (8). The study provides estimates of the capacity (bed volumes until breakthrough at 10 ppb arsenic) of adsorptive media in the same chlorinated water. Near the end of the test the feedwater pH was lowered to assess the affect on bed capacity and as a prelude to a controlled pH study (Socorro Springs Phase 2).

Aragon, Malynda Jo; Everett, Randy L.; Siegel, Malcolm Dean; Kottenstette, Richard Joseph; Holub, William E. Jr; Wright, Jeremy B.; Dwyer, Brian P.

2007-05-01T23:59:59.000Z

254

Advantages of the shielded containers at the Waste Isolation Pilot Plant.  

Science Conference Proceedings (OSTI)

The Waste Isolation Pilot Plant (WIPP) disposal operations currently employ two different disposal methods: one for Contact Handled (CH) waste and another for Remote Handled (RH) waste. CH waste is emplaced in a variety of payload container configurations on the floor of each disposal room. In contrast, RH waste is packaged into a single type of canister and emplaced in pre-drilled holes in the walls of disposal rooms. Emplacement of the RH waste in the walls must proceed in advance of CH waste emplacement and therefore poses logistical constraints, in addition to the loss of valuable disposal capacity. To improve operational efficiency and disposal capacity, the Department of Energy (DOE) has proposed a shielded container for certain RH waste streams. RH waste with relatively low gammaemitting activity would be packaged in lead-lined containers, shipped to WIPP in existing certified transportation packages for CH waste and emplaced in WIPP among the stacks of CH waste containers on the floor of a disposal room. RH waste with high gamma-emitting activity would continue to be emplaced in the boreholes along the walls. The new RH container is similar to the nominal 208-liter (55-gallon) drum, however it includes about 2.5 cm (1 in) of lead, sandwiched between thick steel sheets. Furthermore, the top and bottom are made of thick plate steel to strengthening the package to meet transportation requirements. This robust configuration provides an overpack for materials that otherwise would be RH waste. This paper describes the container and the regulatory approach used to meet the requirements imposed by regulations that apply to WIPP. This includes a Performance Assessment used to evaluate WIPP's long-term performance and the DOE's approach to gain approval for the transportation of shielded containers. This paper also describes estimates of the DOE's RH transuranic waste inventory that may be packaged and emplaced in shielded containers. Finally, the paper includes a discussion of how the DOE proposes to track the waste packaged into shielded containers against the RH waste inventory and how this will comply with the regulated volume.

Nelson, Roger A. (U.S. Department of Energy, Carlsbad, NM); Dunagan, Sean C.

2010-05-01T23:59:59.000Z

255

Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program  

SciTech Connect

EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

Connolly, M.J.; Sayer, D.L.

1993-11-01T23:59:59.000Z

256

Robust Solution to Difficult Hydrogen Issues When Shipping Transuranic Waste to the Waste Isolation Pilot Plant  

DOE Green Energy (OSTI)

The Waste Isolation Pilot Plant (WIPP) has been open, receiving, and disposing of transuranic (TRU) waste since March 26, 1999. The majority of the waste has a path forward for shipment to and disposal at the WIPP, but there are about two percent (2%) or approximately 3,020 cubic meters (m{sup 3}) of the volume of TRU waste (high wattage TRU waste) that is not shippable because of gas generation limits set by the U.S. Nuclear Regulatory Commission (NRC). This waste includes plutonium-238 waste, solidified organic waste, and other high plutonium-239 wastes. Flammable gases are potentially generated during transport of TRU waste by the radiolysis of hydrogenous materials and therefore, the concentration at the end of the shipping period must be predicted. Two options are currently available to TRU waste sites for solving this problem: (1) gas generation testing on each drum, and (2) waste form modification by repackaging and/or treatment. Repackaging some of the high wattage waste may require up to 20:1 drum increase to meet the gas generation limits of less than five percent (5%) hydrogen in the inner most layer of confinement (the layer closest to the waste). (This is the limit set by the NRC.) These options increase waste handling and transportation risks and there are high costs and potential worker exposure associated with repackaging this high-wattage TRU waste. The U.S. Department of Energy (DOE)'s Carlsbad Field Office (CBFO) is pursuing a twofold approach to develop a shipping path for these wastes. They are: regulatory change and technology development. For the regulatory change, a more detailed knowledge of the high wattage waste (e.g., void volumes, gas generation potential of specific chemical constituents) may allow refinement of the current assumptions in the gas generation model for Safety Analysis Reports for Packaging for Contact-Handled (CH) TRU waste. For technology development, one of the options being pursued is the use of a robust container, the ARROW-PAK{trademark} System. (1) The ARROW-PAK{trademark} is a macroencapsulation treatment technology, developed by Boh Environmental, LLC, New Orleans, Louisiana. This technology has been designed to withstand any unexpected hydrogen deflagration (i.e. no consequence) and other benefits such as criticality control.

Countiss, S. S.; Basabilvazo, G. T.; Moody, D. C. III; Lott, S. A.; Pickerell, M.; Baca, T.; CH2M Hill; Tujague, S.; Svetlik, H.; Hannah, T.

2003-02-27T23:59:59.000Z

257

Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)  

SciTech Connect

Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and correlate different lithologies among the seven wells.

Mercer, J.W.; Cole, D.L.; Holt, R.M.

1998-10-09T23:59:59.000Z

258

DRSPALL :spallings model for the Waste Isolation Pilot Plant 2004 recertification.  

Science Conference Proceedings (OSTI)

This report presents a model to estimate the spallings releases for the Waste Isolation Pilot Plant Performance Assessment (WIPP PA). A spallings release in the context of WIPP PA refers to a portion of the solid waste transported from the subsurface repository to the ground surface due to inadvertent oil or gas drilling into the WIPP repository at some time after site closure. Some solid waste will be removed by the action of the drillbit and drilling fluid; this waste is referred to as cuttings and cavings. If the repository is pressurized above hydrostatic at the time of intrusion, solid waste material local to the borehole may be subject to mechanical failure and entrainment in high-velocity gases as the repository pressure is released to the borehole. Solid material that fails and is transported into the wellbore and thus to the surface comprise the spallings releases. The spallings mechanism is analogous to a well blowout in the modern oil and gas drilling industry. The current spallings conceptual model and associated computer code, DRSPALL, were developed for the 2004 recertification because the prior spallings model used in the 1996 WIPP Compliance Certification Application (CCA) was judged by an independent peer review panel as inadequate (DOE 1996, 9.3.1). The current conceptual model for spallings addresses processes that take place several minutes before and after a borehole intrusion of a WIPP waste room. The model couples a pipe-flow wellbore model with a porous flow repository model, allowing high-pressure gas to flow from the repository to the wellbore through a growing cavity region at the well bottom. An elastic stress model is applied to the porous solid domain that allows for mechanical failure of repository solids if local tensile stress exceeds the tensile strength of the waste. Tensile-failed solids may be entrained into the wellbore flow stream by a fluidized bed model, in which case they are ultimately transported to the land surface comprising a release. In July 2003, DOE/SNL presented the spallings conceptual model to a independent peer review panel in accordance with NUREG 1297 guidelines (NRC, 1988). The panel ultimately judged the model as adequate for implementation in WIPP PA (Yew et al., 2003). This report documents the spallings model history from 1997 to the implementation of DRSPALL in the 2004 Compliance Recertification Application (CRA) (DOE, 2004). The scope of this report includes descriptions of the conceptual model, numerical model, verification and validation techniques, model sensitivity studies, and WIPP PA spallings results as presented in the 2004 CRA.

Gilkey, Amy P. (GRAM Inc., Albuquerque, NM); Hansen, Clifford W.; Schatz, John F. (John F. Schatz Research & Consulting, Inc., Del Mar, CA); Rudeen, David Keith (GRAM Inc., Albuquerque, NM); Lord, David L.

2006-02-01T23:59:59.000Z

259

Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978  

Science Conference Proceedings (OSTI)

The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed.

Best, T.L.; Neuhauser, S. (eds.)

1980-03-01T23:59:59.000Z

260

Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project  

Science Conference Proceedings (OSTI)

This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

Not Available

1992-12-29T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Properties of salt-saturated concrete and grout after six years in situ at the Waste Isolation Pilot Plant  

SciTech Connect

Samples of concrete and grout were recovered from short boreholes in the repository floor at the Waste Isolation Pilot Plant more than six years after the concrete and grout were placed. Plugs from the Plug Test Matrix of the Plugging and Sealing Program of Sandia National Laboratories were overcored to include a shell of host rock. The cores were analyzed at the Waterways Experiment Station to assess their condition after six years of service, having potentially been exposed to those aspects of their service environment (salt, brine, fracturing, anhydrite, etc.) that could cause deterioration. Measured values of compressive strength and pulse velocity of both the grout and the concrete equaled or exceeded values from tests performed on laboratory-tested samples of the same mixtures at ages of one month to one year after casting. The phase assemblages had changed very little. Materials performed as intended and showed virtually no chemical or physical evidence of deterioration. The lowest values for strength and pulse velocity were measured for samples taken from the Disturbed Rock Zone, indicating the influence of cracking in this zone on the properties of enclosed seal materials. There was evidence of movement of brine in the system. Crystalline phases containing magnesium, potassium, sulfate, and other ions had been deposited on free surfaces in fractures and pilot holes. There was a reaction rim in the anhydrite immediately surrounding each recovered borehole plug, suggesting interaction between grout or concrete and host rock. However, the chemical changes apparent in this reaction rim were not reflected in the chemical composition of the adjacent concrete or grout. The grout and concrete studied here showed no signs of the deterioration found to have occurred in some parts of the concrete liner of the Waste Isolation Pilot Plant waste handling shaft.

Wakeley, L.D.; Harrington, P.T.; Weiss, C.A. Jr. [Army Engineer Waterways Experiment Station, Vicksburg, MS (United States). Structures Lab.

1993-06-01T23:59:59.000Z

262

Contact-Handled Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant  

Science Conference Proceedings (OSTI)

The purpose of this document is to summarize the waste acceptance criteria applicable to the transportation, storage, and disposal of contact-handled transuranic (CH-TRU) waste at the Waste Isolation Pilot Plant (WIPP). These criteria serve as the U.S. Department of Energy's (DOE) primary directive for ensuring that CH-TRU waste is managed and disposed of in a manner that protects human health and safety and the environment.The authorization basis of WIPP for the disposal of CH-TRU waste includes the U.S.Department of Energy National Security and Military Applications of Nuclear EnergyAuthorization Act of 1980 (reference 1) and the WIPP Land Withdrawal Act (LWA;reference 2). Included in this document are the requirements and associated criteriaimposed by these acts and the Resource Conservation and Recovery Act (RCRA,reference 3), as amended, on the CH-TRU waste destined for disposal at WIPP.|The DOE TRU waste sites must certify CH-TRU waste payload containers to thecontact-handled waste acceptance criteria (CH-WAC) identified in this document. Asshown in figure 1.0, the flow-down of applicable requirements to the CH-WAC istraceable to several higher-tier documents, including the WIPP operational safetyrequirements derived from the WIPP CH Documented Safety Analysis (CH-DSA;reference 4), the transportation requirements for CH-TRU wastes derived from theTransuranic Package Transporter-Model II (TRUPACT-II) and HalfPACT Certificates ofCompliance (references 5 and 5a), the WIPP LWA (reference 2), the WIPP HazardousWaste Facility Permit (reference 6), and the U.S. Environmental Protection Agency(EPA) Compliance Certification Decision and approval for PCB disposal (references 7,34, 35, 36, and 37). The solid arrows shown in figure 1.0 represent the flow-down of allapplicable payload container-based requirements. The two dotted arrows shown infigure 1.0 represent the flow-down of summary level requirements only; i.e., the sitesmust reference the regulatory source documents from the U.S. Nuclear RegulatoryCommission (NRC) and the New Mexico Environment Department (NMED) for acomprehensive and detailed listing of the requirements.This CH-WAC does not address the subject of waste characterization relating to adetermination of whether the waste is hazardous; rather, the sites are referred to theWaste Analysis Plan (WAP) contained in the WIPP Hazardous Waste Facility Permit fordetails of the sampling and analysis protocols to be used in determining compliance withthe required physical and chemical properties of the waste. Requirements andassociated criteria pertaining to a determination of the radiological properties of thewaste, however, are addressed in appendix A of this document. The collectiveinformation obtained from waste characterization records and acceptable knowledge(AK) serves as the basis for sites to certify that their CH-TRU waste satisfies the WIPPwaste acceptance criteria listed herein.

Washington TRU Solutions LLC

2005-12-29T23:59:59.000Z

263

Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience  

Science Conference Proceedings (OSTI)

On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

Anderson, S.; Bradford, J.; Clements, T.; Crisp, D.; Sherick, M. [CH2M-WG Idaho, Idaho Falls, ID (United States); D'Amico, E. [Washington TRU Solutions, Denver, CO (United States); Lattin, W. [United States Department of Energy, Idaho Operations Office, Idaho Falls, ID (United States); Watson, K. [United States Department of Energy, Carlsbad Field Office, Carlsbad, NM (United States)

2008-07-01T23:59:59.000Z

264

PROBABILISTIC SAFETY ASSESSMENT OF OPERATIONAL ACCIDENTS AT THE WASTE ISOLATION PILOT PLANT  

Science Conference Proceedings (OSTI)

This report presents a probabilistic safety assessment of radioactive doses as consequences from accident scenarios to complement the deterministic assessment presented in the Waste Isolation Pilot Plant (WIPP) Safety Analysis Report (SAR). The International Council of Radiation Protection (ICRP) recommends both assessments be conducted to ensure that ''an adequate level of safety has been achieved and that no major contributors to risk are overlooked'' (ICRP 1993). To that end, the probabilistic assessment for the WIPP accident scenarios addresses the wide range of assumptions, e.g. the range of values representing the radioactive source of an accident, that could possibly have been overlooked by the SAR. Routine releases of radionuclides from the WIPP repository to the environment during the waste emplacement operations are expected to be essentially zero. In contrast, potential accidental releases from postulated accident scenarios during waste handling and emplacement could be substantial, which necessitates the need for radiological air monitoring and confinement barriers (DOE 1999). The WIPP Safety Analysis Report (SAR) calculated doses from accidental releases to the on-site (at 100 m from the source) and off-site (at the Exclusive Use Boundary and Site Boundary) public by a deterministic approach. This approach, as demonstrated in the SAR, uses single-point values of key parameters to assess the 50-year, whole-body committed effective dose equivalent (CEDE). The basic assumptions used in the SAR to formulate the CEDE are retained for this report's probabilistic assessment. However, for the probabilistic assessment, single-point parameter values were replaced with probability density functions (PDF) and were sampled over an expected range. Monte Carlo simulations were run, in which 10,000 iterations were performed by randomly selecting one value for each parameter and calculating the dose. Statistical information was then derived from the 10,000 iteration batch, which included 5%, 50%, and 95% dose likelihood, and the sensitivity of each assumption to the calculated doses. As one would intuitively expect, the doses from the probabilistic assessment for most scenarios were found to be much less than the deterministic assessment. The lower dose of the probabilistic assessment can be attributed to a ''smearing'' of values from the high and low end of the PDF spectrum of the various input parameters. The analysis also found a potential weakness in the deterministic analysis used in the SAR, a detail on drum loading was not taken into consideration. Waste emplacement operations thus far have handled drums from each shipment as a single unit, i.e. drums from each shipment are kept together. Shipments typically come from a single waste stream, and therefore the curie loading of each drum can be considered nearly identical to that of its neighbor. Calculations show that if there are large numbers of drums used in the accident scenario assessment, e.g. 28 drums in the waste hoist failure scenario (CH5), then the probabilistic dose assessment calculations will diverge from the deterministically determined doses. As it is currently calculated, the deterministic dose assessment assumes one drum loaded to the maximum allowable (80 PE-Ci), and the remaining are 10% of the maximum. The effective average of drum curie content is therefore less in the deterministic assessment than the probabilistic assessment for a large number of drums. EEG recommends that the WIPP SAR calculations be revisited and updated to include a probabilistic safety assessment.

Rucker, D.F.

2000-09-01T23:59:59.000Z

265

Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 4. Commercial and pilot plant cost data. Final report  

DOE Green Energy (OSTI)

This volume of the advanced central receiver final report presents the cost data using the cost breakdown structure identified in the preliminary specification. Cost summaries are presented in the following sections for the 100-MWe and 281-MWe commercial plant and a 10-MWe pilot plant. Cost substantiation data for this volume are presented in the appendices. Other cost summary data include Nth plant data for the 100-MWe and 281-MWe commercial plants, and a summary for the alternative concept air-rock storage system. The main description of the plant costing technique occurs as part of Section II for the 100-MWe baseline concept.

Not Available

1979-03-01T23:59:59.000Z

266

City Water and Light Plant | Open Energy Information  

Open Energy Info (EERE)

and Light Plant and Light Plant Jump to: navigation, search Name City Water and Light Plant Place Arkansas Utility Id 9879 Utility Location Yes Ownership M NERC Location SPP NERC SPP Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service- Large Industrial General Service- Large(Primary Metering) Industrial General Service- Small Electric Rate Commercial General service (Residential Electric Rate) Residential

267

Revision of the Record of Decision for the Department of Energy's Waste Isolation Pilot Plant Disposal Phase  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56 56 Federal Register / Vol. 69, No. 125 / Wednesday, June 30, 2004 / Notices 1 In addition to more significant quantities of PCB-contaminated waste already at the Hanford site, DOE transferred a small amount of TRU waste with PCBs (4 cubic meters) from the Energy Technology Engineering Site in California to Hanford in December 2002 for characterization, repackaging, and storage pending shipment to WIPP. 67 FR 56989 (Sept. 6, 2002). At that time, DOE designated that particular waste for disposal at WIPP in accordance with the WIPP Land Withdrawal Act. DEPARTMENT OF ENERGY Revision to the Record of Decision for the Department of Energy's Waste Isolation Pilot Plant Disposal Phase AGENCY: Department of Energy. ACTION: Revision to record of decision. SUMMARY: The Department of Energy

268

A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)  

SciTech Connect

This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries.

Powers, D.W. [Powers (Dennis W.), Anthony, TX (United States); Martin, M.L. [International Technology, Inc., Las Vegas, NV (United States)

1993-08-01T23:59:59.000Z

269

Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States  

Science Conference Proceedings (OSTI)

The opening of the Waste Isolation Pilot Plant on March 26, 1999, was the culmination of a regulatory assessment process that had taken 25 years. National policy issues, negotiated agreements, and court settlements during the first 15 years of the project had a strong influence on the amount and type of scientific data collected up to this point. Assessment activities before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to satisfy negotiated agreements with the State of New Mexico, or (3) to develop general understanding of selected natural phenomena associated with nuclear waste disposal. In the last 10 years, federal compliance policy and actual regulations were sketched out, and continued to evolve until 1996. During this period, stochastic simulations were introduced as a tool for the assessment of the WIPP's performance, and four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed.

RECHARD,ROBERT P.

2000-03-01T23:59:59.000Z

270

Milestones for Disposal of Radioactive Waste at the Waste Isolation Pilot Plant (WIPP) in the United States  

E-Print Network (OSTI)

Six years (1983 to 1989) were spent constructing the Waste Isolation Pilot Plant (WIPP) in southern New Mexico for disposal of transuranic radioactive waste. However, not until 1999, 25 years after its identification as a potential deep geologic repository, did the WIPP receive its first shipment of waste. This report presents a concise history in tabular form of events leading up to its selection, including the development of regulatory criteria, major political conflicts, negotiated agreements, and technical milestones of the WIPP. In general, technical programs and engineering analysis of the WIPP before the mid 1980s were undertaken primarily (1) to develop general understanding of selected natural phenomena, (2) to satisfy needs for environmental impact statements, and (3) to satisfy negotiated agreements between the U.S. Department of Energy and the State of New Mexico. In the final segment of the project, federal compliance policy was developed and technical programs and enginee...

Rob Rechard Performance; Techmcal Information Serwce; Rob P. Rechard; Rob P. Rechard

1998-01-01T23:59:59.000Z

271

Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 7: Appendix GCR Volume 2  

Science Conference Proceedings (OSTI)

This report contains the second part of the geological characterization report for the Waste Isolation Pilot Plant. Both hydrology and geochemistry are evaluated. The following aspects of hydrology are discussed: surface hydrology; ground water hydrology; and hydrology drilling and testing. Hydrologic studies at the site and adjacent site areas have concentrated on defining the hydrogeology and associated salt dissolution phenomena. The geochemical aspects include a description of chemical properties of geologic media presently found in the surface and subsurface environments of southeastern New Mexico in general, and of the proposed WIPP withdrawal area in particular. The characterization does not consider any aspect of artificially-introduced material, temperature, pressure, or any other physico-chemical condition not native to the rocks of southeastern New Mexico.

NONE

1995-03-31T23:59:59.000Z

272

Solar Pilot Plant Phase I, detailed design report: collector subsystem research experiment. CDRL Item No. 6 (Approved)  

DOE Green Energy (OSTI)

The configurations of the experimental heliostat, power and control system, and support elements for the Barstow Solar Pilot Plant are described, and the analytical and experimental determination of performance parameters is discussed. A system analysis is presented, including demonstration of pointing accuracy by error analysis, and demonstration of loop performance by simulation. Engineering model test plans are given that are to evaluate subassemblies, processes, and procedures as well as provide insight into best tests for heliostat subsystem testing. Mirror module test data are analyzed. A comprehensive test plan for the experimental model is presented. Appended are: a heliostat power consumption analysis; collector subsystem research experiment detail specification; structural analysis; solar image analysis; computer and software information; breadboard test data; simulation of the heliostat control loop; mirror module reflectance measurements; plywood frame fixed focus mirror module test data; techniques for redirected image characterization; performance of a meteorological measuring system; and heliostat design data. (LEW)

Not Available

1976-08-31T23:59:59.000Z

273

An introduction to the mechanics of performance assessment using examples of calculations done for the Waste Isolation Pilot Plant between 1990 and 1992. Revision  

Science Conference Proceedings (OSTI)

This document provides an overview of the processes used to access the performance of the Waste Isolation Pilot Plant (WIPP). The quantitative metrics used in the performance-assessment (PA) process are those put forward in the Environmental Protection Agency`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, HIgh-LEvel and transuranic radioactive Wastes (40 CFR 191).

Rechard, R.P.

1996-06-01T23:59:59.000Z

274

10 MWe Solar Thermal Central Receiver Pilot Plant. Solar facilities design integration. Construction package No. 9 (RADL Item 7-33). Piping and mechanical equipment installation  

DOE Green Energy (OSTI)

Installed, tested and operable mechanical equipment, piping and accessories are presented for the Barstow Solar Pilot Plant. The work also includes furnishing and installing HVAC equipment and miscellaneous steel work; performing miscellaneous earthquake; and performance testing of the installed piping and mechanical equipment.

Not Available

1980-06-01T23:59:59.000Z

275

Pilot plant testing of Illinois coal for blast furnace injection. Technical report, September 1--November 30, 1994  

Science Conference Proceedings (OSTI)

The purpose of this study is to evaluate the combustion of Illinois coal in the blast furnace injection process in a new and unique pilot plant test facility. This investigation is significant to the use of Illinois coal in that the limited research to date suggests that coals of low fluidity and moderate to high sulfur and chlorine contents are suitable feedstocks for blast furnace injection. This study is unique in that it is the first North American effort to directly determine the nature of the combustion of coal injected into a blast furnace. It is intended to complete the study already underway with the Armco and Inland steel companies and to demonstrate quantitatively the suitability of both the Herrin No. 6 and Springfield No. 5 coals for blast furnace injection. The main feature of the current work is the testing of Illinois coals at CANMET`s (Canadian Centre for Mineral and Energy Technology) pilot plant coal combustion facility. This facility simulates blowpipe-tuyere conditions in an operating blast furnace, including blast temperature (900 C), flow pattern (hot velocity 200 m/s), geometry, gas composition, coal injection velocity (34 m/s) and residence time (20 ms). The facility is fully instrumented to measure air flow rate, air temperature, temperature in the reactor, wall temperature, preheater coil temperature and flue gas analysis. During this quarter a sample of the Herrin No. 6 coal (IBCSP 112) was delivered to the CANMET facility and testing is scheduled for the week of 11 December 1994. Also at this time, all of the IBCSP samples are being evaluated for blast furnace injection using the CANMET computer model.

Crelling, J.C. [Southern Illinois Univ., Carbondale, IL (United States). Dept. of Geology

1994-12-31T23:59:59.000Z

276

Pilot-Scale Demonstration of hZVI Process for Treating Flue Gas Desulfurization Wastewater at Plant Wansley, Carrollton, GA  

E-Print Network (OSTI)

The hybrid Zero Valent Iron (hZVI) process is a novel chemical treatment platform that has shown great potential in our previous bench-scale tests for removing selenium, mercury and other pollutants from Flue Gas Desulfurization (FGD) wastewater. This integrated treatment system employs new iron chemistry to create highly reactive mixture of Fe^0, iron oxides (FeOx) and various forms of Fe (II) for the chemical transformation and mineralization of various heavy metals in water. To further evaluate and develop the hZVI technology, a pilot-scale demonstration had been conducted to continuously treat 1-2 gpm of the FGD wastewater for five months at Plant Wansley, a coal-fired power plant of Georgia Power. This demonstrated that the scaled-up system was capable of reducing the total selenium (of which most was selenate) in the FGD wastewater from over 2500 ppb to below 10 ppb and total mercury from over 100 ppb to below 0.01 ppb. This hZVI system reduced other toxic metals like Arsenic (III and V), Chromium (VI), Cadmium (II), Lead (II) and Copper (II) from ppm level to ppb level in a very short reaction time. The chemical consumption was estimated to be approximately 0.2-0.4 kg of ZVI per 1 m^3 of FGD water treated, which suggested the process economics could be very competitive. The success of the pilot test shows that the system is scalable for commercial application. The operational experience and knowledge gained from this field test could provide guidance to further improvement of technology for full scale applications. The hZVI technology can be commercialized to provide a cost-effective and reliable solution to the FGD wastewater and other metal-contaminated waste streams in various industries. This technology has the potential to help industries meet the most stringent environmental regulations for heavy metals and nutrients in wastewater treatment.

Peddi, Phani 1987-

2011-12-01T23:59:59.000Z

277

Multi-Pollutant Emissions Control: Pilot Plant Study of Technologies for Reducing Hg, SO3, NOx and CO2 Emissions  

SciTech Connect

A slipstream pilot plant was built and operated to investigate technology to adsorb mercury (Hg) onto the existing particulate (i.e., fly ash) by cooling flue gas to 200-240 F with a Ljungstrom-type air heater or with water spray. The mercury on the fly ash was then captured in an electrostatic precipitator (ESP). An alkaline material, magnesium hydroxide (Mg(OH){sub 2}), is injected into flue gas upstream of the air heater to control sulfur trioxide (SO{sub 3}), which prevents acid condensation and corrosion of the air heater and ductwork. The slipstream was taken from a bituminous coal-fired power plant. During this contract, Plant Design and Construction (Task 1), Start Up and Maintenance (Task 2), Baseline Testing (Task 3), Sorbent Testing (Task 4), Parametric Testing (Task 5), Humidification Tests (Task 6), Long-Term Testing (Task 7), and a Corrosion Study (Task 8) were completed. The Mercury Stability Study (Task 9), ESP Report (Task 11), Air Heater Report (Task 12) and Final Report (Task 14) were completed. These aspects of the project, as well as progress on Public Outreach (Task 15), are discussed in detail in this final report. Over 90% mercury removal was demonstrated by cooling the flue gas to 200-210 F at the ESP inlet; baseline conditions with 290 F flue gas gave about 26% removal. Mercury removal is sensitive to flue gas temperature and carbon content of fly ash. At 200-210 F, both elemental and oxidized mercury were effectively captured at the ESP. Mg(OH){sub 2} injection proved effective for removal of SO{sub 3} and eliminated rapid fouling of the air heater. The pilot ESP performed satisfactorily at low temperature conditions. Mercury volatility and leaching tests did not show any stability problems. No significant corrosion was detected at the air heater or on corrosion coupons at the ESP. The results justify larger-scale testing/demonstration of the technology. These conclusions are presented and discussed in two presentations given in July and September of 2005 and are included in Appendices E and F.

Michael L. Fenger; Richard A. Winschel

2005-08-31T23:59:59.000Z

278

Population dynamics of iron-oxidizing communities in pilot plants for the treatment of acid mine waters  

Science Conference Proceedings (OSTI)

The iron-oxidizing microbial community in two pilot plants for the treatment of acid mine water was monitored to investigate the influence of different process parameters such as pH, iron concentration, and retention time on the stability of the system to evaluate the applicability of this treatment technology on an industrial scale. The dynamics of the microbial populations were followed using T-RFLP (terminal restriction fragment length polymorphism) over a period of several months. For a more precise quantification, two TaqMan assays specific for the two prominent groups were developed and the relative abundance of these taxa in the iron-oxidizing community was verified by real-time PCR. The investigations revealed that the iron-oxidizing community was clearly dominated by two groups of Betaproteobacteria affiliated with the poorly known and not yet recognized species 'Ferrovum myxofaciens' and with strains related to Gallionella ferruginea, respectively. These taxa dominated the microbial community during the whole investigation period and accelerated the oxidation of ferrous iron despite the changing characteristics of mine waters flowing into the plants. Thus, it is assumed that the treatment technology can also be applied to other mine sites and that these organisms play a crucial role in such treatment systems. 32 refs., 4 figs. 1 tab.

Elke Heinzel; Eberhard Janneck; Franz Glombitza; Michael Schlmann; Jana Seifert [TU Bergakademie Freiberg, Freiberg (Germany). Interdisciplinary Ecological Center

2009-08-15T23:59:59.000Z

279

Summary of Test Results from Babcock & Wilcox's 30 MWth Oxy-Coal Pilot Plant  

Science Conference Proceedings (OSTI)

If CO2 capture and storage (CCS) is to be implemented and play a role in keeping electricity prices affordable under proposed emission restrictions, its rate of progress must be accelerated. Demonstration plants need to be deployed in the short-term to allow the technology to evolve and become more efficient and cost effective. One way to reduce the costs of CCS from coal-fired power plants is by adopting oxy-combustion. With this technology, instead of using air, oxygen is mixed with recycled flue gas. ...

2009-09-30T23:59:59.000Z

280

Institute for Renewable Energy Ltd Preparation of a pilot biogas CHP plant integrated with  

E-Print Network (OSTI)

plant integrated with a converted wood-chip fired municipal district heating system. As a result-chip district heating, fuel switch, public-private partnership End-user area Target Audience Technical New Planning issues Transport companies District Heating Sustainable communities Utilities Solar energy User

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Design of a pilot silvicultural biomass farm at the Savannah River Plant  

DOE Green Energy (OSTI)

Metrek has designed a detailed plan for the establishment and operation of a 1000-acre silvicultural biomass farm at the Savannah River Plant, Aiken, South Carolina. The plan includes a discussion of possible sites, layout and design, and installation and operation. The estimated costs of installation and operation are also presented.

Salo, D.J.; Henry, J.F.; Inman, R.E.

1979-03-01T23:59:59.000Z

282

Solar pilot plant, phase I. Quarterly report No. 4, July--September 1976  

DOE Green Energy (OSTI)

The technical and economic feasibility of generating electricity from solar energy is being studied. Collector experiments included heliostat tests. Hardware preparation and assembly constituted the steam generator work. The thermal storage subsystem research experiment, which featured thermal energy storage in a sodium nitrite/sodium hydroxide phase-change mixture, was discontinued. Analytical and design work on the electrical generation subsystem and plant integration progressed satisfactorily. (MHR)

None

1977-01-15T23:59:59.000Z

283

Solar Pilot Plant, Phase I. Quarterly report No. 5, October--December 1976  

DOE Green Energy (OSTI)

Collector subsystem research experiment (SRE) tests were conducted and the data evaluated. Assembly of the SRE steam generator was almost complete. Testing will start in January 1977. Two major changes in the baseline design, sensible thermal heat storage rather than phase-change storage and wet rather than dry cooling of the condenser, were being worked. Analytical and design work on the electrical generation subsystem and plant integration progressed satisfactorily.

None

1977-03-31T23:59:59.000Z

284

Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Pilot Plant  

DOE Green Energy (OSTI)

The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

Brown, E.S.; Homer, G.B.; Spencer, S.G.; Shaber, C.R.

1980-05-30T23:59:59.000Z

285

Collection and conversion of silicon furnace waste gas into higher value products: Phase 3, 6 MW pilot plant dc closed furnace technology. Final report  

SciTech Connect

The construction and operation of a 6 MW, closed dc furnace for smelting silicon was the primary focus of Phase 3. A 6 MW, dc closed furnace pilot plant was built in East Selkirk, Manitoba, Canada. The furnace is equipped with world`s most modern automatic control system used to control and monitor the process variables and operational data. This control system is suitable for commercial applications and could be used with either closed or open dc furnaces for smelting silicon or ferrosilicon. The construction was started in September 1990, and the facility was operational within 18 months. Following successful commissioning of the pilot plant in June 1992, twelve smelting test campaigns were conducted through November 1994.

Dosaj, V.D.

1995-01-01T23:59:59.000Z

286

Impact of Proposed Disturbed Rock Zone Conceptual Model Modifications to the Waste Isolation Pilot Plant Performance Assessment  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE) and Sandia National Laboratories (SNL) have recently proposed a set of updates that integrate data from recent site characterization studies to two conceptual models for the Waste Isolation Pilot Plant's Performance Assessment (WIPP PA) program. This paper discusses the changes to the Disturbed Rock Zone (DRZ) model, which describes the macroscopic manifestation of grain-scale microcracks and larger macro-cracks that are created by induced stresses in the salt surrounding excavations. The DRZ, as modeled in WIPP PA, is an important component of the repository system because its properties affect the quantity of available brine and its ability to enter the waste areas as well as the connectivity of panels after closure. The DOE and SNL have proposed decreasing the region that represents the DRZ in WIPP PA. Additionally, it has been proposed to make the permeability of DRZ a time-dependent quantity to reflect the long-term behavior. In this paper, the implementation of the proposed DRZ model changes is outlined, and the impact of the DRZ modifications on the long-term performance of the WIPP is discussed. The DRZ modifications generally reduced the amount of brine that entered into the repository, as well as reduced the pressure in the repository, except for scenarios in which a pressurized brine pocket was encountered. Overall, the saturation and pressure changes affected the frequency and magnitude of the direct brine and spalling volumes. (authors)

Clayton, D.J.; Ismail, A.E. [Sandia National Laboratories, Carlsbad, NM (United States)

2008-07-01T23:59:59.000Z

287

Systems analysis, long-term radionuclide transport, and dose assessments, Waste Isolation Pilot Plant (WIPP), southeastern New Mexico, September 1989  

SciTech Connect

This study supports the Waste Isolation Pilot Plant (WIPP) Final Supplemental Environmental Impact Statement and has two main objectives. First, it describes current ideas about the characteristics and potential impacts of the disturbed-rock zone (DRZ) known to develop with time around excavations at the WIPP horizon. Second, it presents new calculations of radionuclide migration within and from the WIPP repository for steady-state undisturbed conditions and for two cases that consider human intrusion into the repository. At the WIPP, the presence of a DRZ has been confirmed by geophysical studies, gas-flow tests, and direct observations. The DRZ will allow gas or brine from waste-emplacement panels to bypass panel seals and flow into adjacent portions of the underground workings unless preventive measures are taken. Revised calculations of the undisturbed performance of the repository indicate that no radionuclides will be released into the Culebra Dolomite within the regulatory period of 10,000 years. The human-intrusion calculations included here assume a connection between the WIPP repository, an occurrence of pressurized brine within the underlying Castile Formation, and the overlying Culebra Dolomite. 61 refs., 40 figs., 16 tabs.

Lappin, A.R.; Hunter, R.L.; Davies, P.B.; Borns, D.J. (Sandia National Labs., Albuquerque, NM (USA)); Reeves, M.; Pickens, J. (Intera Technologies, Inc., Austin, TX (USA)); Iuzzolino, H.J. (Geo-Centers, Inc., Albuquerque, NM (USA))

1990-12-01T23:59:59.000Z

288

Effect of explicit representation of detailed stratigraphy on brine and gas flow at the Waste Isolation Pilot Plant  

Science Conference Proceedings (OSTI)

Stratigraphic units of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) disposal room horizon includes various layers of halite, polyhalitic halite, argillaceous halite, clay, and anhydrite. Current models, including those used in the WIPP Performance Assessment calculations, employ a ``composite stratigraphy`` approach in modeling. This study was initiated to evaluate the impact that an explicit representation of detailed stratigraphy around the repository may have on fluid flow compared to the simplified ``composite stratigraphy`` models currently employed. Sensitivity of model results to intrinsic permeability anisotropy, interbed fracturing, two-phase characteristic curves, and gas-generation rates were studied. The results of this study indicate that explicit representation of the stratigraphy maintains higher pressures and does not allow as much fluid to leave the disposal room as compared to the ``composite stratigraphy`` approach. However, the differences are relatively small. Gas migration distances are also different between the two approaches. However, for the two cases in which explicit layering results were considerably different than the composite model (anisotropic and vapor-limited), the gas-migration distances for both models were negligible. For the cases in which gas migration distances were considerable, van Genuchten/Parker and interbed fracture, the differences between the two models were fairly insignificant. Overall, this study suggests that explicit representation of the stratigraphy in the WIPP PA models is not required for the parameter variations modeled if ``global quantities`` (e.g., disposal room pressures, net brine and gas flux into and out of disposal rooms) are the only concern.

Christian-Frear, T.L.; Webb, S.W. [Sandia National Labs., Albuquerque, NM (United States). Geohydrology Dept.

1996-04-01T23:59:59.000Z

289

Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project  

SciTech Connect

Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL`s Program is utilizing nearly all areas in PMI`s Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?`` and ``How are you approaching similar challenges?`` will be questions for a dialog with the audience.

Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

1995-07-01T23:59:59.000Z

290

Final phase testing and evaluation of the 500 kW direct contact pilot plant at East Mesa  

DOE Green Energy (OSTI)

The testing performed during the last phase of the geothermal direct contact heat exchanger program utilizing the 500 kW pilot plant provided more insight into the capabilities and limits of the direct contact approach and showed that more work needs to be done to understand the inner workings of a large direct contact heat exchanger if they are to be modeled analytically. Testing of the column demonstrated that the performance was excellent and that the sizing criteria is conservative. The system operated smoothly and was readily controlled over a wide range of operating conditions. Performance evaluation showed pinch differentials of 4/sup 0/F or less and better than predicted heat transfer capability. Testing during this final phase was directed towards establishing the limits of the column to transfer heat. The working column height was shortened progressively to approximately 16 feet from a design length of 28 feet. The short column performed as well as a full length column and there are indications that the column could have been shortened even more without affecting its ability to transfer heat. The column's ability to perform as well with shortened lengths indicates that the heat transfer coefficients and criteria derived from the small scale tests are very conservative.

Olander, R.; Oshmyansky, S.; Nichols, K.; Werner, D.

1983-12-01T23:59:59.000Z

291

Analysis of solutes in groundwaters from the Rustler Formation at and near the Waste Isolation Pilot Plant site  

SciTech Connect

Between 1976 and 1986, groundwater samples from more than 60 locations in the vicinity of the Waste Isolation Pilot Plant site were collected and analyzed for a variety of major, minor, and trace solutes. Most of the samples were from the Rustler Formation (the Culebra Dolomite, the Magenta Dolomite, or the zone at the contact between the Rustler and underlying Salado Formations) or the Dewey Lake Red Beds. The analytical data from the laboratories are presented here with accompanying discussions of sample collection methods, supporting field measurements, and laboratory analytical methods. A comparison of four data sets and a preliminary evaluation of the data for the major solutes (Cl{sup {minus}}, SO{sub 4}{sup {minus}2}, Na, K, Ca, and Mg) shows that the data for samples analyzed by UNC/Bendix for SNL seem to be the most reliable, but that at some locations, samples representative of the native, unperturbed groundwater have not been collected. At other locations, the water chemistry has apparently changed between sampling episodes.

Robinson, K.L.

1997-09-01T23:59:59.000Z

292

Uncertainty and sensitivity analyses for gas and brine migration at the Waste Isolation Pilot Plant, May 1992  

SciTech Connect

Uncertainty and sensitivity analysis techniques based on Latin hypercube sampling, partial correlation analysis, stepwise regression analysis and examination of scatterplots are used in conjunction with the BRAGFLO model to examine two phase flow (i.e., gas and brine) at the Waste Isolation Pilot Plant (WIPP), which is being developed by the US Department of Energy as a disposal facility for transuranic waste. The analyses consider either a single waste panel or the entire repository in conjunction with the following cases: (1) fully consolidated shaft, (2) system of shaft seals with panel seals, and (3) single shaft seal without panel seals. The purpose of this analysis is to develop insights on factors that are potentially important in showing compliance with applicable regulations of the US Environmental Protection Agency (i.e., 40 CFR 191, Subpart B; 40 CFR 268). The primary topics investigated are (1) gas production due to corrosion of steel, (2) gas production due to microbial degradation of cellulosics, (3) gas migration into anhydrite marker beds in the Salado Formation, (4) gas migration through a system of shaft seals to overlying strata, and (5) gas migration through a single shaft seal to overlying strata. Important variables identified in the analyses include initial brine saturation of the waste, stoichiometric terms for corrosion of steel and microbial degradation of cellulosics, gas barrier pressure in the anhydrite marker beds, shaft seal permeability, and panel seal permeability.

Helton, J.C. [Arizona State Univ., Tempe, AZ (United States); Bean, J.E. [New Mexico Engineering Research Inst., Albuquerque, NM (United States); Butcher, B.M. [Sandia National Labs., Albuquerque, NM (United States); Garner, J.W.; Vaughn, P. [Applied Physics, Inc., Albuquerque, NM (United States); Schreiber, J.D. [Science Applications International Corp., Albuquerque, NM (United States); Swift, P.N. [Tech Reps, Inc., Albuquerque, NM (United States)

1993-08-01T23:59:59.000Z

293

Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 3: Appendix BIR Volume 1  

Science Conference Proceedings (OSTI)

The Waste Isolation Pilot Plant (WIPP) Transuranic Waste Baseline Inventory Report (WTWBIR) establishes a methodology for grouping wastes of similar physical and chemical properties, from across the US Department of Energy (DOE) transuranic (TRU) waste system, into a series of ``waste profiles`` that can be used as the basis for waste form discussions with regulatory agencies. The majority of this document reports TRU waste inventories of DOE defense sites. An appendix is included which provides estimates of commercial TRU waste from the West Valley Demonstration Project. The WIPP baseline inventory is estimated using waste streams identified by the DOE TRU waste generator/storage sites, supplemented by information from the Mixed Waste Inventory Report (MWIR) and the 1994 Integrated Data Base (IDB). The sites provided and/or authorized all information in the Waste Stream Profiles except the EPA (hazardous waste) codes for the mixed inventories. These codes were taken from the MWIR (if a WTWBIR mixed waste stream was not in MWIR, the sites were consulted). The IDB was used to generate the WIPP radionuclide inventory. Each waste stream is defined in a waste stream profile and has been assigned a waste matrix code (WMC) by the DOE TRU waste generator/storage site. Waste stream profiles with WMCs that have similar physical and chemical properties can be combined into a waste matrix code group (WMCG), which is then documented in a site-specific waste profile for each TRU waste generator/storage site that contains waste streams in that particular WMCG.

NONE

1995-03-31T23:59:59.000Z

294

Preliminary comparison with 40 CFR Part 191, Subpart B for the Waste Isolation Pilot Plant, December 1990  

Science Conference Proceedings (OSTI)

The Waste Isolation Pilot Plant (WIPP) is planned as the first mined geologic repository for transuranic (TRU) wastes generated by defense programs of the United States Department of Energy (DOE). Before disposing of waste at the WIPP, the DOE must evaluate compliance with the United states Environmental Protection Agency's (EPA) Standard, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR Part 191, US EPA, 1985). Sandia National Laboratories (SNL) is evaluating long-term performance against criteria in Subpart B of the Standard. Performance assessment'' as used in this report includes analyses for the Containment Requirements ({section} 191.13(a)) and the Individual Protection Requirements ({section} 191.15). Because proving predictions about future human actions or natural events is not possible, the EPA expects compliance to be determined on the basis of specified quantitative analyses and informed, qualitative judgment. The goal of the WIPP performance-assessment team at SNL is to provide as detailed and thorough a basis as practical for the quantitative aspects of that decision. This report summarizes SNL's late-1990 understanding of the WIPP Project's ability to evaluate compliance with Subpart B. 245 refs., 88 figs., 23 tabs.

Bertram-Howery, S.G.; Marietta, M.G.; Rechard, R.P.; Anderson, D.R. (Sandia National Labs., Albuquerque, NM (USA)); Swift, P.N. (Tech. Reps., Inc., Albuquerque, NM (USA)); Baker, B.L. (Technadyne Engineering Consultants, Inc., Albuquerque, NM (USA)); Bean, J.E. Jr.; McCurley, R.D.; Rudeen, D.K. (New Mexico Engineering Research Inst., Albuquerque, NM (USA)); Beyeler, W.; Brinster, K.F.; Guzowski, R.V.; Sch

1990-12-01T23:59:59.000Z

295

Solar pilot plant, phase I. Quarterly report No. 2, January--March 1976  

DOE Green Energy (OSTI)

During the report period, conceptual designs for the collector and steam generator subsystem research experiments (SREs) were approved, and design detailing began. The thermal storage SRE concept was modified through additional analyses and engineering model experiments and resubmitted for evaluation. Detailed designs for all three subsystems will be submitted during the next quarter. Preparation for SRE testing proceeded through procurement of long-leadtime items and detailed definition of test arrangements. Analysis and design of the electrical generation subsystem and balance of the plant proceeded essentially on schedule.

None

1976-08-20T23:59:59.000Z

296

Internal Technical Report, Management Plan for Fluid Supply and Injection System for the Raft River 5 MW(e) Pilot Power Plant  

DOE Green Energy (OSTI)

This report details a plan for developing a fluid supply system for the First 5 MW(e) Pilot Power Plant at Raft River. The pilot plant has been specifically designed to use the medium-temperature geothermal water so common throughout the West. EG and G Idaho, Inc., the Department of Energy Raft River Rural Electric Co-op, the US Geological Survey (USGS) and the State of Idaho have worked together to develop a facility that will use an organic liquid as the working fluid. Four wells have been drilled in the Raft River Valley, about ten miles South of Malta, in southern Idaho. The completed well system will consist of seven wells: two conventional injection wells, three production wells, and a standby reserve well of each type. The additional three wells are to be drilled in FY-1978, in order to complete a coordinated test program before the First Pilot Power Plant is ready for operation. The system has been designed to meet the test-loop pilot plant's basic requirement: a 2450 gpm supply of geothermal fluid, at a nominal temperature of 290 F and with salinity of less than 5000 ppm. Injection of cooled geothermal fluid into the Raft River reservoir will also require a network of monitor wells. The Idaho Department of Water Resources (IDWR), USGS, EG and G Idaho, and the Department of Energy will jointly select sites for two 1500-foot and five 500-foot monitoring wells. This plan considers the work required to complete construction of the fluid supply system and obtain a preliminary check of its performance capability; the plan will discuss project management, costs, schedules, drilling, testing, environmental monitoring, and safety.

None

1978-01-09T23:59:59.000Z

297

A Pilot Scale Evaluation of Surfactant-Enhanced In Situ Chemical Oxidation (S-ISCO) Technology: A Field Application at a Former Manu factured Gas Plant  

Science Conference Proceedings (OSTI)

Former manufactured gas plant (MGP) sites commonly contain areas where coal tar has been released, potentially existing in several phases including non-aqueous phase liquid (NAPL) in portions of the subsurface site soils. This report describes a field-based pilot scale study of an in situ oxidation technology called Surfactant-Enhanced In Situ Chemical Oxidation (S-ISCO), which was developed by VeruTEK Technologies, Inc.BackgroundCoal tar can remain as ...

2013-10-29T23:59:59.000Z

298

Start-up operations at the Fenton Hill HDR Pilot Plant  

DOE Green Energy (OSTI)

With the completion of the surface test facilities at Fenton Hill, the Hot Dry Rock (HDR) Geothermal Energy Program at Los Alamos is moving steadily into the next stage of development. Start-up operations of the surface facilities have begun in preparation for testing the Phase II reservoir and the initial steady-state phase of operations. A test program has been developed that will entail a number of operational strategies to characterize the thermal performance of the reservoir. The surface facilities have been designed to assure high reliability while providing the flexibility and control to support the different operating modes. This paper presents a review of the system design and provides a discussion of the preliminary results of plant operations and equipment performance.

Ponden, R.F.

1991-01-01T23:59:59.000Z

299

Start-Up Operations at the Fenton Hill HDR Pilot Plant  

DOE Green Energy (OSTI)

With the completion of the surface test facilities at Fenton Hill, the Hot Dry Rock (HDR) Geothermal Energy Program at Los Alamos is moving steadily into the next stage of development. Start-up operations of the surface facilities have begun in preparation for testing the Phase II reservoir and the initial steady-state phase of operations. A test program has been developed that will entail a number of operational strategies to characterize the thermal performance of the reservoir. The surface facilities have been designed to assure high reliability while providing the flexibility and control to support the different operating modes. This paper presents a review of the system design and provides a discussion of the preliminary results of plant operations and equipment performance.

Ponden, Raymond F.

1992-03-24T23:59:59.000Z

300

Historical Exposures to Chemicals at the Rocky Flats Nuclear Weapons Plant: A Pilot Retrospective Exposure Assessment  

SciTech Connect

In a mortality study of white males who had worked at the Rocky Flats Nuclear Weapons Plant between 1952 and 1979, an increased number of deaths from benign and unspecified intracranial neoplasms was found. A case-control study nested within this cohort investigated the hypothesis that an association existed between brain tumor death and exposure to either internally deposited plutonium or external ionizing radiation. There was no statistically significant association found between estimated radiation exposure from internally deposited plutonium and the development of brain tumors. Exposure by job or work area showed no significant difference between the cohort and the control groups. An update of the study found elevated risk estimates for (1) all lymphopoietic neoplasms, and (2) all causes of death in employees with body burdens greater than or equal to two nanocuries of plutonium. There was an excess of brain tumors for the entire cohort. Similar cohort studies conducted on worker populations from other plutonium handling facilities have not yet shown any elevated risks for brain tumors. Historically, the Rocky Flats Nuclear Weapons Plant used large quantities of chemicals in their production operations. The use of solvents, particularly carbon tetrachloride, was unique to Rocky Flats. No investigation of the possible confounding effects of chemical exposures was done in the initial studies. The objectives of the present study are to (1) investigate the history of chemical use at the Rocky Flats facility; (2) locate and analyze chemical monitoring information in order to assess employee exposure to the chemicals that were used in the highest volume; and (3) determine the feasibility of establishing a chemical exposure assessment model that could be used in future epidemiology studies.

Janeen Denise Robertson

1999-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Receiver subsystem analysis report (RADL Item 4-1). 10-MWe Solar Thermal Central-Receiver Pilot Plant: solar-facilities design integration  

DOE Green Energy (OSTI)

The results are presented of those thermal hydraulic, structural, and stress analyses required to demonstrate that the Receiver design for the Barstow Solar Pilot Plant will satisfy the general design and performance requirements during the plant's design life. Recommendations resulting from those analyses and supporting test programs are presented regarding operation of the receiver. The analyses are limited to receiver subsystem major structural parts (primary tower, receiver unit core support structure), pressure parts (absorber panels, feedwater, condensate and steam piping/components, flash tank, and steam mainfold) and shielding. (LEW)

Not Available

1982-04-01T23:59:59.000Z

302

Report for Treating Hanford LAW and WTP SW Simulants: Pilot Plant Mineralizing Flowsheet  

SciTech Connect

The US Department of Energy is responsible for managing the disposal of radioactive liquid waste in underground storage tanks at the Hanford site in Washington State. The Hanford waste treatment and immobilization plant (WPT) will separate the waste into a small volume of high level waste (HLW), containing most of the radioactive constituents, and a larger volume of low activity waste (LAW), containing most of the non-radioactive chemical and hazardous constituents. The HLW and LAW will be converted into immobilized waste forms for disposal. Currently there is inadequate LAW vitrification capacity planned at the WTP to complete the mission within the required timeframe. Therefore additional LAW capacity is required. One candidate supplemental treatment technology is the fluidized bed steam reformer process (FBSR). This report describes the demonstration testing of the FBSR process using a mineralizing flowsheet for treating simulated Hanford LAW and secondary waste from the WTP (WTP SW). The FBSR testing project produced leach-resistant solid products and environmentally compliant gaseous effluents. The solid products incorporated normally soluble ions into an alkali alumino-silicate (NaS) mineral matrix. Gaseous emissions were found to be within regulatory limits. Cesium and rhenium were captured in the mineralized products with system removal efficiencies of 99.999% and 99.998 respectively. The durability and leach performance of the FBSR granular solid were superior to the low activity reference material (LMR) glass standards. Normalized product consistency test (PCT) release rates for constituents of concern were approximately 2 orders of magnitude less than that of sodium in the Hanford glass [standard].

Arlin Olson

2012-02-28T23:59:59.000Z

303

Establishment of uncertainty ranges and probability distributions of actinide solubilities for performance assessment in the Waste Isolation Pilot Plant (WIPP).  

Science Conference Proceedings (OSTI)

The Fracture-Matrix Transport (FMT) code developed at Sandia National Laboratories solves chemical equilibrium problems using the Pitzer activity coefficient model with a database containing actinide species. The code is capable of predicting actinide solubilities at 25 C in various ionic-strength solutions from dilute groundwaters to high-ionic-strength brines. The code uses oxidation state analogies, i.e., Am(III) is used to predict solubilities of actinides in the +III oxidation state; Th(IV) is used to predict solubilities of actinides in the +IV state; Np(V) is utilized to predict solubilities of actinides in the +V state. This code has been qualified for predicting actinide solubilities for the Waste Isolation Pilot Plant (WIPP) Compliance Certification Application in 1996, and Compliance Re-Certification Applications in 2004 and 2009. We have established revised actinide-solubility uncertainty ranges and probability distributions for Performance Assessment (PA) by comparing actinide solubilities predicted by the FMT code with solubility data in various solutions from the open literature. The literature data used in this study include solubilities in simple solutions (NaCl, NaHCO{sub 3}, Na{sub 2}CO{sub 3}, NaClO{sub 4}, KCl, K{sub 2}CO{sub 3}, etc.), binary mixing solutions (NaCl+NaHCO{sub 3}, NaCl+Na{sub 2}CO{sub 3}, KCl+K{sub 2}CO{sub 3}, etc.), ternary mixing solutions (NaCl+Na{sub 2}CO{sub 3}+KCl, NaHCO{sub 3}+Na{sub 2}CO{sub 3}+NaClO{sub 4}, etc.), and multi-component synthetic brines relevant to the WIPP.

Long, Jennifer; Nowak, Jim; Ismail, Ahmed E.; Brush, Laurence H.; Xiong, Yongliang

2010-03-01T23:59:59.000Z

304

Interpretation of brine-permeability tests of the Salado Formation at the Waste Isolation Pilot Plant site: First interim report  

Science Conference Proceedings (OSTI)

Pressure-pulse tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Hydraulic conductivities ranging from about 10{sup {minus}14} to 10{sup {minus}11} m/s (permeabilities of about 10{sup {minus}21} to 10{sup {minus}18} m{sup 2}) have been interpreted from nine tests conducted on five stratigraphic intervals within eleven meters of the WIPP underground excavations. Tests of a pure halite layer showed no measurable permeability. Pore pressures in the stratigraphic intervals range from about 0.5 to 9.3 MPa. An anhydrite interbed (Marker Bed 139) appears to be one or more orders of magnitude more permeable than the surrounding halite. Hydraulic conductivities appear to increase, and pore pressures decrease, with increasing proximity to the excavations. These effects are particularly evident within two to three meters of the excavations. Two tests indicated the presence of apparent zero-flow boundaries about two to three meters from the boreholes. The other tests revealed no apparent boundaries within the radii of influence of the tests, which were calculated to range from about four to thirty-five meters from the test holes. The data are insufficient to determine if brine flow through evaporites results from Darcy-like flow driven by pressure gradients within naturally interconnected porosity or from shear deformation around excavations connecting previously isolated pores, thereby providing pathways for fluids at or near lithostatic pressure to be driven towards the low-pressure excavations. Future testing will be performed at greater distances from the excavations to evaluate hydraulic properties and processes beyond the range of excavation effects.

Beauheim, R.L. (Sandia National Labs., Albuquerque, NM (United States)); Saulnier, G.J. Jr.; Avis, J.D. (INTERA, Inc., Austin, TX (United States))

1991-08-01T23:59:59.000Z

305

Unresolved issues for the disposal of remote-handled transuranic waste in the Waste Isolation Pilot Plant  

SciTech Connect

The purpose of the Waste Isolation Pilot Plant (WIPP) is to dispose of 176,000 cubic meters of transuranic (TRU) waste generated by the defense activities of the US Government. The envisioned inventory contains approximately 6 million cubic feet of contact-handled transuranic (CH TRU) waste and 250,000 cubic feet of remote handled transuranic (RH TRU) waste. CH TRU emits less than 0.2 rem/hr at the container surface. Of the 250,000 cubic feet of RH TRU waste, 5% by volume can emit up to 1,000 rem/hr at the container surface. The remainder of RH TRU waste must emit less than 100 rem/hr. These are major unresolved problems with the intended disposal of RH TRU waste in the WIPP. (1) The WIPP design requires the canisters of RH TRU waste to be emplaced in the walls (ribs) of each repository room. Each room will then be filled with drums of CH TRU waste. However, the RH TRU waste will not be available for shipment and disposal until after several rooms have already been filled with drums of CH TRU waste. RH TRU disposal capacity will be loss for each room that is first filled with CH TRU waste. (2) Complete RH TRU waste characterization data will not be available for performance assessment because the facilities needed for waste handling, waste treatment, waste packaging, and waste characterization do not yet exist. (3) The DOE does not have a transportation cask for RH TRU waste certified by the US Nuclear Regulatory Commission (NRC). These issues are discussed along with possible solutions and consequences from these solutions. 46 refs.

Silva, M.K.; Neill, R.H.

1994-09-01T23:59:59.000Z

306

Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 4, Revision 1.0  

Science Conference Proceedings (OSTI)

The US Department of Energy is currently constructing the Waste Isolation Pilot near Carlsbad, New Mexico. The full-scale pilot plant will demonstrate the feasibility of the safe disposal of defense-related nuclear waste in a bedded salt formation at a depth of 2160 feet below the surface. WIPP will provide for the permanent storage of 25,000 cu ft of remote-handled (RH) transuranic waste and 6,000,000 cu ft of contact-handled (CH) transuranic waste. This paper covers the major mechanical/structural design considerations for the waste hoist and its hoist tower structure. The design of the hoist system and safety features incorporates state-of-the-art technology developed in the hoist and mining industry to ensure safe operation for transporting nuclear waste underground. Also included are design specifications for VOC-10 monitoring system.

Not Available

1991-12-31T23:59:59.000Z

307

Solar Pilot Plant, Phase I. Preliminary design report. Volume II, Book 3. Dynamic simulation model and computer program descriptions. CDRL item 2. [SPP dynamics simulation program  

DOE Green Energy (OSTI)

The mathematical models and computer program comprising the SPP Dynamic Simulation are described. The SPP Dynamic Simulation is a computerized model representing the time-varying performance characteristics of the SPP. The model incorporates all the principal components of the pilot plant. Time-dependent direct normal solar insulation, as corrupted by simulated cloud passages, is transformed into absorbed radiant power by actions of the heliostat field and enclosed receiver cavity. The absorbed power then drives the steam generator model to produce superheated steam for the turbine and/or thermal storage subsystems. The thermal storage subsystem can, in turn, also produce steam for the turbine. The turbine using the steam flow energy produces the mechanical shaft power necessary for the generator to convert it to electrical power. This electrical power is subsequently transmitted to a transmission grid system. Exhaust steam from the turbine is condensed, reheated, deaerated, and pressurized by pumps for return as feedwater to the thermal storage and/or steam generator. A master control/instrumentation system is utilized to coordinate the various plant operations. The master controller reacts to plant operator demands and control settings to effect the desired output response. The SPP Dynamic Simulation Computer program is written in FORTRAN language. Various input options (e.g., insolation values, load demands, initial pressures/temperatures/flows) are permitted. Plant performance may be monitored via computer printout or computer generated plots. The remainder of this document describes the detailed pilot plant dynamic model, the basis for this simulation, and the utilization of this simulation to obtain analytical plant performance results.

None

1977-05-01T23:59:59.000Z

308

Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

The Office of Health, Safety and Security HSS Logo Department of Energy Seal Left Tab SEARCH Right Tab TOOLS Right Tab Left Tab HOME Right Tab Left Tab ABOUT US Right Tab Left Tab...

309

Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 1, Third comparison with 40 CFR 191, Subpart B  

Science Conference Proceedings (OSTI)

Before disposing of transuranic radioactive wastes in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments of the WIPP for the DOE to provide interim guidance while preparing for final compliance evaluations. This volume contains an overview of WIPP performance assessment and a preliminary comparison with the long-term requirements of the Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B).

Not Available

1992-12-01T23:59:59.000Z

310

Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization (40 CFR {section} 761.75[c])  

Science Conference Proceedings (OSTI)

This initial report is being submitted pursuant to Title 40 Code of Federal Regulations (CFR) {section} 761.75(c) to request authorization to allow the disposal of transuranic (TRU) wastes containing polychlorinated biphenyls (PCBs) which are duly regulated under the Toxic Substances Control Act (TSCA). Approval of this initial report will not affect the disposal of TRU or TRU mixed wastes that do not contain PCBs. This initial report also demonstrates how the Waste Isolation Pilot Plant (WIPP) meets or exceeds the technical standards for a Chemical Waste Landfill. Approval of this request will allow the U.S. Department of Energy (DOE) to dispose of approximately 88,000 cubic feet (ft3) (2,500 cubic meters [m3]) of TRU wastes containing PCBs subject to regulation under the TSCA. This approval will include only those PCB/TRU wastes, which the TSCA regulations allow for disposal of the PCB component in municipal solid waste facilities or chemical waste landfills (e.g., PCB remediation waste, PC B articles, and bulk PCB product waste). Disposal of TRU waste by the DOE is congressionally mandated in Public Law 102-579 (as amended by the National Defense Authorization Act for Fiscal Year 1997, Pub. L. 104-201, referred to as the WIPP Land Withdrawal Act [LWA]). Portions of the TRU waste inventory contain hazardous waste constituents regulated under 40 CFR Parts 260 through 279, and/or PCBs and PCB Items regulated under 40 CFR Part 761. Therefore, the DOE TRU waste program must address the disposal requirements for these hazardous waste constituents and PCBs. To facilitate the disposal of TRU wastes containing hazardous waste constituents, the owner/operators received a Hazardous Waste Facility Permit (HWFP) from the New Mexico Environment Department (NMED) on October 27, 1999. The permit allows the disposal of TRU wastes subject to hazardous waste disposal requirements (TRU mixed waste). Informational copies of this permit and other referenced documents are available from the WIPP website. To facilitate the disposal of TRU wastes containing PCBs, the owner/operators are hereby submitting this initial report containing information required pursuant to the Chemical Waste Landfill Approval requirements in 40 CFR {section} 761.75(c). Although WIPP is defined as a miscellaneous unit and not a landfill by the New Mexico Hazardous Waste Act, WIPP meets or exceeds all applicable technical standards for chemical waste landfills by virtue of its design and programs as indicated in the Engineering Report (Attachment B). The layout of this initial report is consistent with requirements (i.e., Sections 2.0 through 12.0 following the sequence of 40 CFR {section} 761.75[c][i] -[ix] with sections added to discuss the Contingency and Training Plans; and Attachment B of this initial report addresses the requirements of 40 CFR {section} 761.75[b][1] through [9] in this order). This initial report includes a description of three proposed changes that will be subject to ''conditional approval.'' The first will allow the disposal of remote-handled (RH) PCB/TRU waste at WIPP. The second will allow the establishment of a central confirmation facility at WIPP. The third will allow for an increase in contact-handled Working Copy Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization DOE/WIPP 02-3196 (CH) waste storage capacities. These proposed changes are discussed further in Section 3.3 of this initial report. ''Conditional approval'' of these requests would allow these activities at WIPP contingent upon: - Approval of the HWFP modification (NMED) and Compliance Certification Application (CCA) change request (Environmental Protection Agency [EPA]) - Inspection of facility prior to implementing the change (if deemed necessary by the EPA) - Written approval from the EPA This initial report also includes the following three requests for waivers to the technical requirements for Chemical Waste Landfills pursuant to 40 CFR {section} 761.75(c)(4): - Hydrologic Conditions (40 CFR {section} 761.75[b][3]) - Monitoring Systems (40 CFR {sect

Westinghouse TRU Solutions

2002-03-19T23:59:59.000Z

311

10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration: system integration laboratory test plan (RADL item 6-4)  

DOE Green Energy (OSTI)

A general demonstration test plan is provided for the activities to be accomplished at the Systems Integration Laboratory. The Master Control System, Subsystem Distributed Process Control, Representative Signal Conditioning Units, and Redline Units from the Receiver Subsystem and the Thermal Storage Subsystem and other external interface operational functions will be integrated and functionally demonstrated. The Beckman Multivariable Control Unit will be tested for frequency response, static checks, configuration changes, switching transients, and input-output interfaces. Maximum System Integration Laboratory testing will demonstrate the operational readiness of Pilot Plant controls and external interfaces that are available. Minimum System Integration Laboratory testing will be accomplished with reduced set of hardware, which will provide capability for continued development and demonstration of Operational Control System plant control application software. Beam Control System Integration Laboratory testing will demonstrate the operational readiness of the Beam Control System equipment and software. (LEW)

Not Available

1980-10-01T23:59:59.000Z

312

10-MWe solar-thermal central-receiver pilot plant, solar facilities design integration: collector-field optimization report (RADL item 2-25)  

DOE Green Energy (OSTI)

Appropriate cost and performance models and computer codes have been developed to carry out the collector field optimization, as well as additional computer codes to define the actual heliostat locations in the optimized field and to compute in detail the performance to be expected of the defined field. The range of capabilities of the available optimization and performance codes is described. The role of the optimization code in the definition of the pilot plant is specified, and a complete description of the optimization process itself is given. The detailed cost model used by the optimizer for the commercial system optimization is presented in the form of equations relating the cost element to each of the factors that determine it. The design basis for the commercial system is presented together with the rationale for its selection. The development of the individual heliostat performance code is presented. Use of the individual heliostat code in a completed study of receiver panel power under sunrise startup conditions is described. The procedure whereby performance and heliostat spacing data from the representative commercial-scale system are converted into coefficients of use in the layout processor is described, and the actual procedure used in the layout processor is described. Numerous special studies in support of the pilot plant design are described. (LEW)

Not Available

1981-01-01T23:59:59.000Z

313

Environmental assessment of the HYGAS process. Volume III. Interim report on HYGAS environmental characterization: manual of methods for characterization of HYGAS pilot plant solids, liquids, and gases  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) has commissioned the HYGAS environmental assessment program to characterize various solid, liquid, and gaseous streams in the HYGAS pilot plant. The purpose of this manual is to describe the various analytical techniques that have been used to analyze pilot plant streams for environmental species. Many of the techniques have been recommended by the US Environmental Protection Agency or otherwise have been published in ASTM Standards, Standard Methods, and assorted vendor equipment manuals. Complete references have been provided in the text. Analytical techniques for the determination of the following are included: ammonia-nitrogen; biochemical oxygen demand; chemical oxygen demand; chlorides; total cyanide; grease and oil; total organic carbon; phenol; total, suspended, and dissolved solids; sulfide; total sulfur; thiocyanate; total oxygen demand; hydrocyanic acid in gas; hydrogen sulfide in gas; gaseous hydrocarbons; organic compounds in HYGAS light oil and aqueous samples; proximate analysis of coal; ultimate analysis of coal; calorific value; screen analysis; bulk density; and trace elements in coal (arsenic, antimony, selenium, tellurium, barium, beryllium chromium, copper, iron, lithium, manganese, nickel, tin, vanadium, zinc, boron, cadmium, lead, thallium, chlorine, cobalt, fluorine, mercury, and molybdenum). (DMC)

Karst, R.H.; Passaniti, J.L.; Metcalf, T.C.; Salazar, E.V.; Pau, J.C.

1980-11-01T23:59:59.000Z

314

Emergency Management Program Review at the Waste Isolation Pilot...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Emergency Management Program Review at the May 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ......

315

Supplement Analysis for Disposal of Polychlorinated Biphenyl-Commingled Transuranic Waste at the Waste Isolation Pilot Plant (DOE/EIS-0026-SA02) (6/23/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disposal of Disposal of Polychlorinated Biphenyl-Commingled Transuranic Waste at the Waste Isolation Pilot Plant (DOE/EIS-0026-SA02) 1.0 Purpose and Need for Action Transuranic (TRU) waste is waste that contains alpha particle-emitting radionuclides with atomic numbers greater than uranium (92) and half-lives greater than 20 years, in concentrations greater than 100 nanocuries per gram of waste. Some TRU wastes are mixed with polychlorinated biphenyls (PCBs) (referred to as PCB-commingled TRU waste). PCBs exist in DOE's TRU waste as mixtures of synthetic organic chemicals with physical properties ranging from oily liquids to waxy solids. Exposure to PCBs can result in adverse health effects. For example, PCBs in blood or in fatty tissue as a result of inhalation, ingestion, or dermal absorption may cause reproductive effects,

316

An introduction to the mechanics of performance assessment using examples of calculations done for the Waste Isolation Pilot Plant between 1990 and 1992  

Science Conference Proceedings (OSTI)

This document provides an overview of the process used to assess the performance of the Waste Isolation Pilot Plant (WIPP), a proposed repository for transuranic wastes that is located in southeastern New Mexico. The quantitative metrics used in the performance-assessment (PA) process are those put forward in the Environmental Protection Agency`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive flasks (40 CFR 191). Much has been written about the individual building blocks that comprise the foundation of PA theory and practice, and that WIPP literature is well cited herein. However, the present approach is to provide an accurate, well documented overview of the process, from the perspective of the mechanical steps used to perform the actual PA calculations. Specifically, the preliminary stochastic simulations that comprise the WIPP PAs of 1990, 1991. and 1992 are summarized.

Rechard, R.P.

1995-10-01T23:59:59.000Z

317

SOLERAS - Solar-Powered Water Desalination Project at Yanbu: Forecasting models for operating and maintenance cost of the pilot plant  

Science Conference Proceedings (OSTI)

This study was conducted in cooperation with the Department of Industrial Engineering of King Abdulaziz University. The main objective of this study is to meet some of the goals of the Solar Energy Water Desalination Plant (SEWDP) plan in the area of economic evaluation. The first part of this project focused on describing the existing trend in the operation and maintenance (OandM) cost for the SOLERAS Solar Energy Water Desalination Plant in Yanbu. The second part used the information obtained on existing trends to find suitable forecasting models. These models, which are found here, are sensitive to changes in costs trends. Nevertheless, the study presented here has established the foundation for (OandM) costs estimating in the plant. The methodologies used in this study should continue as more data on operation and maintenance costs become available, because, in the long run, the trend in costs will help determine where cost effectiveness might be improved. 7 refs., 24 figs., 15 tabs.

Al-Idrisi, M.; Hamad, G.

1987-04-01T23:59:59.000Z

318

Results from the Texas Pilot Project on Superior Energy Performance  

E-Print Network (OSTI)

This presentation will address the outcomes to date from the Texas Pilot Project on Superior Energy Performance. Five plants in Texas are participating in this national pilot project, which began July 2008.

Ferland, K.

2009-05-01T23:59:59.000Z

319

Pilot Application of Risk-Informed Safety Margins to Support Nuclear Plant Long-Term Operation Decisions  

Science Conference Proceedings (OSTI)

This report describes an industry application of the risk-informed safety margin characterization (RISMC) framework to the analysis of the impacts of a power uprate to a loss of main feedwater (LOMFW) event. The primary objective of this effort was to assess the changes in the safety margins for this event that result from the elevated power levels associated with a hypothetical plant power uprate. This analysis focused on the probabilistic risk assessment modeling of feed-and-bleed operation for ...

2012-12-12T23:59:59.000Z

320

PILOT-AND FULL-SCALE DEMONSTRATION OF ADVANCED MERCURY CONTROL TECHNOLOGIES FOR LIGNITE-FIRED POWER PLANTS  

SciTech Connect

The overall objective of the project was to develop advanced innovative mercury control technologies to reduce mercury emissions by 50%-90% in flue gases typically found in North Dakota lignite-fired power plants at costs from one-half to three-quarters of current estimated costs. Power plants firing North Dakota lignite produce flue gases that contain >85% elemental mercury, which is difficult to collect. The specific objectives were focused on determining the feasibility of the following technologies: Hg oxidation for increased Hg capture in dry scrubbers, incorporation of additives and technologies that enhance Hg sorbent effectiveness in electrostatic precipitators (ESPs) and baghouses, the use of amended silicates in lignite-derived flue gases for Hg capture, and the use of Hg adsorbents within a baghouse. The approach to developing Hg control technologies for North Dakota lignites involved examining the feasibility of the following technologies: Hg capture upstream of an ESP using sorbent enhancement, Hg oxidation and control using dry scrubbers, enhanced oxidation at a full-scale power plant using tire-derived fuel and oxidizing catalysts, and testing of Hg control technologies in the Advanced Hybrid{trademark} filter.

Steven A. Benson; Charlene R. Crocker; Kevin C. Galbreath; Jay R. Gunderson; Michael J. Holmes; Jason D. Laumb; Jill M. Mackenzie; Michelle R. Olderbak; John H. Pavlish; Li Yan; Ye Zhuang

2005-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOE/EIS-0026-SA-03: Supplement Analysis for The Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis For Disposal of Certain Rocky Flats Supplement Analysis For Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant PURPOSE The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tons (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Several DOE environmental impact statements (EISs) discuss the potential impacts from different proposed alternatives for the storage and disposition of surplus plutonium and waste containing surplus plutonium. These EISs evaluated and presented the potential impacts for

322

An approach to estimating radiological risk of offsite release from a design basis earthquake for the Process Experimental Pilot Plant (PREPP)  

SciTech Connect

In compliance with Department of Energy (DOE) Order 6430.1A, a seismic analysis was performed on DOE's Process Experimental Pilot Plant (PREPP), a facility for processing low-level and transuranic (TRU) waste. Because no hazard curves were available for the Idaho National Engineering Laboratory (INEL), DOE guidelines were used to estimate the frequency for the specified design-basis earthquake (DBE). A dynamic structural analysis of the building was performed, using the DBE parameters, followed by a probabilistic risk assessment (PRA). For the PRA, a functional organization of the facility equipment was effected so that top events for a representative event tree model could be determined. Building response spectra (calculated from the structural analysis), in conjunction with generic fragility data, were used to generate fragility curves for the PREPP equipment. Using these curves, failure probabilities for each top event were calculated. These probabilities were integrated into the event tree model, and accident sequences and respective probabilities were calculated through quantification. By combining the sequences failure probabilities with a transport analysis of the estimated airborne source term from a DBE, onsite and offsite consequences were calculated. The results of the comprehensive analysis substantiated the ability of the PREPP facility to withstand a DBE with negligible consequence (i.e., estimated release was within personnel and environmental dose guidelines). 57 refs., 19 figs., 20 tabs.

Lucero, V.; Meale, B.M.; Reny, D.A.; Brown, A.N.

1990-09-01T23:59:59.000Z

323

Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 8: Appendices HYDRO, IRD, LTM, NUTS, PAR, PMR, QAPD, RBP  

SciTech Connect

Geohydrologic data have been collected in the Los Medanos area at the US Department of Energy`s proposed Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico since 1975 as part of a study evaluating the feasibility of storing defense-associated nuclear wastes within the bedded salt of the Salado Formation of Permian age. Drilling and hydrologic testing have identified three principal water-bearing zones above the Salado Formation and one below that could potentially transport wastes to the biosphere if the proposed facility were breached. The zones above the Salado are the contact between the Rustler and Salado Formations and the Culebra and Magenta Dolomite Members of the Rustler Formation of Permian age. The zone below the Salado Formation consists of channel sandstones in the Bell Canyon Formation of the Permian Delaware Mountain Group. Determinations of hydraulic gradients, directions of flow, and hydraulic properties were hindered because of the negligible permeability of the water-bearing zones. Special techniques in drilling, well completion, and hydraulic testing have been developed to determine the hydrologic characteristics of these water-producing zones.

NONE

1995-03-31T23:59:59.000Z

324

Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 5: Appendices D and D, DEF, FAC  

SciTech Connect

This plan serves to describe the objectives of decommissioning for the Waste Isolation Pilot Plant (WIPP), identifies the elements necessary to accomplish the decommissioning, and defines the steps to execute those elements in a safe and environmentally sound manner. The plan provides a strategy for progressing from the final actions of the Disposal Phase, through the Decontamination and Decommissioning Phase, and into the initiation of the Long-Term Monitoring Phase. This plan describes a sequence of events for decontamination of the WIPP facilities and structures used to manage and contain TRU and TRU mixed waste during the receipt and emplacement operations. Alternative methods of decontamination are provided where practical. The methods for packaging and disposal of the waste generated (derived waste) during this process are discussed. The best available technology at the time of this plan`s development, may become outmoded by future technology and alternative strategies. If alternative technologies are identified the affected stakeholder(s), the Secretary of the Interior and the State will be consulted prior to implementation.

NONE

1995-03-31T23:59:59.000Z

325

H-Coal pilot plant. Topical report: evaluation of a commercial laundry process for cleaning work clothing from a synthetic-fuels facility, E and H-12  

SciTech Connect

A scientific study was undertaken by Ashland Synthetic Fuels, Inc., to evaluate the cleaning efficiency of work clothing from the H-Coal Pilot Plant by a commercial laundry facility. Laundry process conditions for cleaning clothes were determined, and procedures were developed for laboratory analysis to detect coal liquefaction heavy distillate in work clothing and laundry wastewater. Laboratory testing and longwave ultraviolet light were used to monitor for skin contamination from recycled work clothing. Laboratory studies with spiked, unwashed cloth swatches showed a heavy distillate recovery efficiency of 86%. The laundry process was found to remove 98% of heavy distillate from spiked, washed cloth swatches. Low levels of heavy distillate and three polynuclear aromatic hydrocarbons were found in laundry wastewater, recycled work shirts and uncleaned T-shirts worn in process areas. Hydrocarbon material content in wastewater can be satisfactorily treated by process wastewater treatment units at synfuels facilities. There were data to suggest that process material accumulates in recycled work shirts (outer clothing) to about three times the level in new control shirts, but this accumulation was not noted in T-shirts (underclothing). Although residual process material was found in work shirts and gloves after cleaning, skin fluorescence monitoring with ultraviolet light indicates that skin contamination from contact with recycled gloves and work shirts is not occurring.

Hill, R.H.; Tussey, L.B.

1983-01-01T23:59:59.000Z

326

Hydrogen generation by metal corrosion in simulated Waste Isolation Pilot Plant environments. Progress report for the period November 1989 through December 1992  

DOE Green Energy (OSTI)

The corrosion and gas-generation characteristics of three material types: low-carbon steel (the current waste packaging material for the Waste Isolation Pilot Plant), Cu-base materials, and Ti-base materials were determined in both the liquid and vapor phase of Brine A, a brine representative of an intergranular Salado Formation brine. Test environments included anoxic brine and anoxic brine with overpressures of CO{sub 2}, H{sub 2}S, and H{sub 2}. Low-carbon steel reacted at a slow, measurable rate with anoxic brine, liberating H{sub 2} on an equimolar basis with Fe reacted. Presence of CO{sub 2} caused the initial reaction to proceed more rapidly, but CO{sub 2}-induced passivation stopped the reaction if the CO{sub 2} were present in sufficient quantities. Low-carbon steel immersed in brine with H{sub 2}S showed no reaction, apparently because of passivation of the steel by formation of a protective iron sulfide reaction product. Cu- and Ti-base materials showed essentially no corrosion when exposed to brine and overpressures of N{sub 2}, CO{sub 2}, and H{sub 2}S except for the rapid and complete reaction between Cu-base materials and H{sub 2}S. No significant reaction took place on any material in any environment in the vapor-phase exposures.

Telander, M.R.; Westerman, R.E. [Pacific Northwest Lab., Richland, WA (United States)

1993-09-01T23:59:59.000Z

327

Experience in the commercial operation of the pilot asynchronized turbogenerator T3FA-110 at cogeneration plant-22 (TETs-22) of the Mosenergo Company  

Science Conference Proceedings (OSTI)

Results of commercial operation of a world pioneer asynchronized turbogenerator T3FA-110 with a capacity of 11 MW and full air cooling at a cogeneration plant are presented. The turbogenerator developed jointly by the Electric Power Research Institute and the Elektrosila Company differs from traditional synchronous generators by the presence on the rotor of two mutually orthogonal windings, a two-channel reverse thyristor excitation system, and a special control system. The special features of design and control allow such generators to operate in the modes of both production and high consumption of reactive power at normal static and dynamic stability. This widens the range of regulation of the voltage level in the connected electric network and makes it possible to bring parallel-connected synchronous generators to optimum operation conditions. The generator can work without excitation for a long time at 70% load. Commercial operation of the pilot T3FA-110 turbogenerator started in December 2003 at TETs-22 of the Mosenergo Company and has proved its full correspondence to the design engineering parameters. A program of wide use of such turbogenerators in the United Power System of Russia (RAO 'EES Rossii' Co.) has been developed.

Zinakov, V. E.; Chernyshev, E. V.; Kuzin, G. A.; Voronov, V. K.; Labunets, I. A. [Mosenergo Company (Russian Federation)

2006-01-15T23:59:59.000Z

328

Waste Isolation Pilot Plant Materials Interface Interactions Test: Papers presented at the Commission of European Communities workshop on in situ testing of radioactive waste forms and engineered barriers  

Science Conference Proceedings (OSTI)

The three papers in this report were presented at the second international workshop to feature the Waste Isolation Pilot Plant (WIPP) Materials Interface Interactions Test (MIIT). This Workshop on In Situ Tests on Radioactive Waste Forms and Engineered Barriers was held in Corsendonk, Belgium, on October 13--16, 1992, and was sponsored by the Commission of the European Communities (CEC). The Studiecentrum voor Kernenergie/Centre D`Energie Nucleaire (SCK/CEN, Belgium), and the US Department of Energy (via Savannah River) also cosponsored this workshop. Workshop participants from Belgium, France, Germany, Sweden, and the United States gathered to discuss the status, results and overviews of the MIIT program. Nine of the twenty-five total workshop papers were presented on the status and results from the WIPP MIIT program after the five-year in situ conclusion of the program. The total number of published MIIT papers is now up to almost forty. Posttest laboratory analyses are still in progress at multiple participating laboratories. The first MIIT paper in this document, by Wicks and Molecke, provides an overview of the entire test program and focuses on the waste form samples. The second paper, by Molecke and Wicks, concentrates on technical details and repository relevant observations on the in situ conduct, sampling, and termination operations of the MIIT. The third paper, by Sorensen and Molecke, presents and summarizes the available laboratory, posttest corrosion data and results for all of the candidate waste container or overpack metal specimens included in the MIIT program.

Molecke, M.A.; Sorensen, N.R. [eds.] [Sandia National Labs., Albuquerque, NM (US); Wicks, G.G. [ed.] [Westinghouse Savannah River Technology Center, Aiken, SC (US)

1993-08-01T23:59:59.000Z

329

Operation of the solvent-refined-coal pilot plant, Wilsonville, Alabama. Annual technical report, January-December 1980  

Science Conference Proceedings (OSTI)

The plant was in operation for the equivalent of 247 days, an on-stream factor of 67.7%. Kentucky 9 coals from the Lafayette, Dotiki and Fies mines were processed. During 1980, the operating conditions and equipment were adjusted to evaluate potential process improvements. These experiments produced significant results in the following areas: Operating V103 High Pressure Separator in the hot mode; varying T102 Vacuum Column operating temperature; adding light SRC (LSRC), a product of the third stage of the Critical Solvent Deashing (CSD) unit, to the process solvent; investigating the effects of the chlorine content of the feed coal on corrosion in the process vessels; evaluating the effects of adding sodium carbonate on corrosion rates; operating under conditions of low severity; i.e., low reactor temperature and long residence time; and testing an alternate CSD deashing solvent. A series of simulation runs investigating the design operating conditions for a planned 6000 ton per day SRC-I demonstation plant were also completed. Numerous improvements were made in the CSD processing area, and the components for a hydrotreating unit were installed.

Lewis, H.E.

1981-08-01T23:59:59.000Z

330

Central receiver solar thermal power system, Phase 1. CDRL Item 2. Pilot plant preliminary design report. Volume V. Thermal storage subsystem. [Sensible heat storage using Caloria HT43 and mixture of gravel and sand  

DOE Green Energy (OSTI)

The proposed 100-MWe Commercial Plant Thermal Storage System (TSS) employs sensible heat storage using dual liquid and solid media for the heat storage in each of four tanks, with the thermocline principle applied to provide high-temperature, extractable energy independent of the total energy stored. The 10-MW Pilot Plant employs a similar system except uses only a single tank. The high-temperature organic fluid Caloria HT43 and a rock mixture of river gravel and No. 6 silica sand were selected for heat storage in both systems. The system design, installation, performance testing, safety characteristics, and specifications are described in detail. (WHK)

Hallet, Jr., R. W.; Gervais, R. L.

1977-10-01T23:59:59.000Z

331

Tracing early breccia pipe studies, Waste Isolation Pilot Plant, southeastern New Mexico: A study of the documentation available and decision-making during the early years of WIPP  

SciTech Connect

Breccia pipes in southeastern New Mexico are local dissolution-collapse features that formed over the Capitan reef more than 500,000 years ago. During early site studies for the Waste Isolation Pilot Plant (WIPP), the threat to isolation by these features was undetermined. Geophysical techniques, drilling, and field mapping were used beginning in 1976 to study breccia pipes. None were found at the WIPP site, and they are considered unlikely to be a significant threat even if undetected. WIPP documents related to breccia pipe studies were assembled, inspected, and analyzed, partly to present a history of these studies. The main objective is to assess how well the record reflects the purposes, results, and conclusions of the studies from concept to decision-making. The main record source was the Sandia WIPP Central File (SWCF). Early records (about 1975 to 1977) are very limited, however, about details of objectives and plans predating any investigation. Drilling programs from about 1977 were covered by a broadly standardized statement of work, field operations plan, drilling history, and basic data report. Generally standardized procedures for peer, management, and quality assurance review were developed during this time. Agencies such as the USGS conducted projects according to internal standards. Records of detailed actions for individual programs may not be available, though a variety of such records were found in the SWCF. A complete written record cannot be reconstructed. With persistence, a professional geologist can follow individual programs, relate data to objectives (even if implied), and determine how conclusions were used in decision-making. 83 refs.

Power, D.W. [HC 12, Anthony, TX (United States)

1996-01-01T23:59:59.000Z

332

Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 4, Chapter D, Appendix D1 (beginning), Revision 3  

SciTech Connect

The Waste Isolation Pilot Plant (WIPP), which is designed for receipt, handling, storage, and permanent isolation of defense-generated transuranic wastes, is being excavated at a depth of approximately 655 m in bedded halites of the Permian Salado Formation of southeastern New Mexico. Site-characterization activities at the present WIPP site began in 1976. Full construction of the facility began in 1983, after completion of ``Site and Preliminary Design Validation`` (SPDV) activities and reporting. Site-characterization activities since 1983 have had the objectives of updating or refining the overall conceptual model of the geologic, hydrologic, and structural behavior of the WIPP site and providing data adequate for use in WIPP performance assessment. This report has four main objectives: 1. Summarize the results of WIPP site-characterization studies carried out since the spring of 1983 as a result of specific agreements between the US Department of Energy and the State of New Mexico. 2. Summarize the results and status of site-characterization and facility-characterization studies carried out since 1983, but not specifically included in mandated agreements. 3. Compile the results of WIPP site-characterization studies into an internally consistent conceptual model for the geologic, hydrologic, geochemical, and structural behavior of the WIPP site. This model includes some consideration of the effects of the WIPP facility and shafts on the local characteristics of the Salado and Rustler Formations. 4. Discuss the present limitations and/or uncertainties in the conceptual geologic model of the WIPP site and facility. The objectives of this report are limited in scope, and do not include determination of whether or not the WIPP Project will comply with repository-performance criteria developed by the US Environmental Protection Agency (40CFR191).

Not Available

1993-03-01T23:59:59.000Z

333

Implementation of the Resource Disincentive in 40 CFR part 191.14 (e) at the Waste Isolation Pilot Plant. Revision 1  

SciTech Connect

In 1986, the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) (DOE-WPO) prepared a strategy for complying with the Environmental Protection Agency`s (EPA`s) Standards for the management of transuranic (TRU) waste. Section 3.2.2.2 of the DOE`s report addressed compliance with the Assurance Requirements found in 40 CFR {section} 191.14. One of the Assurance Requirements addresses the selection of repository sites that contain recoverable natural resources. This report documents that the site selection process for the WIPP facility did indeed comply with the natural resource disincentive requirement in 40 CFR {section} 191,14(e) at the time selected and therefore complies with the standard at this time. Thus, it shall be shown that it is reasonably certain that the WIPP site provides better overall protection than practical alternatives that were available when the site was selected. It is important to point out here, and it will be discussed later in the report, that the resource disincentive requirement is a preliminary siting criterion that requires further evaluation of sites that have resources (i.e, hydrocarbons, minerals and groundwater) in the vicinity or on the site. This further evaluation requires that for sites that do have resources, a qualitative determination must be made that the site will provide better overall protection than practical alternatives. The purpose of this report is not to provide a quantitative evaluation for selection of the WIPP site. A further discussion on the difference between the qualitative analysis required under 40 CFR {section} 191.14(e) and the quantitative analysis under other sections of 40 CFR 191 is provided in {section}2.1 of this report.

Not Available

1993-06-01T23:59:59.000Z

334

Inspection of Emergency Management at the Waste Isolation Pilot...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy August 2002 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE WASTE ISOLATION PILOT PLANT Volume II August 2002 i INDEPENDENT OVERSIGHT...

335

Waste Isolation Pilot Plant (WIPP) Waste Isolation Pilot Plant...  

National Nuclear Security Administration (NNSA)

dispose of transuranic radioactive waste, or TRU waste, left over from the production of nuclear weapons. After more than 20 years of scientific study, public input, and...

336

Enviropower hot gas desulfurization pilot  

SciTech Connect

The objectives of the project are to develop and demonstrate (1) hydrogen sulfide removal using regenerable zinc titanate sorbent in pressurized fluidized bed reactors, (2) recovery of the elemental sulfur from the tail-gas of the sorbent regenerator and (3) hot gas particulate removal system using ceramic candle filters. Results are presented on pilot plant design and testing and modeling efforts.

Ghazanfari, R.; Feher, G.; Konttinen, J.; Ghazanfari, R.; Lehtovaara, A.; Mojtahedi, W.

1994-11-01T23:59:59.000Z

337

Waste Isolation Pilot Plant Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update Update J. R. Stroble Director, National TRU Program U.S. Department of Energy Carlsbad Field Office National Transportation Stakeholder Forum May 11, 2011 Denver, Colorado 2 2 Shipments received at WIPP to date: 9,493 Contact-handled: 9,019 Remote-handled: 474 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 44 84 366 947 818 1,002 98 8 997 1,144 730 1,032 Total Shipments by Calendar Year (Including intersite shipments) 1,194 CH TRU waste shipments only CH and RH TRU waste shipments 472 to date Accomplishments -2010 Shipments Shipments Received - (as of May 2, 2011) Site Shipments Loaded Miles Argonne National Laboratory

338

DOE/EIS-0200-SA-01: Supplement Analysis and Determination for the Proposed Characterization for Disposal of Contact-Handled Transuranic Waste at the Waste Isolation Pilot Plant (WIPP) (12/00)  

NLE Websites -- All DOE Office Websites (Extended Search)

CH-TRU waste may be shipped to WIPP in drums, standard waste boxes, or drum overpacks; 1,250 cubic meters is the CH-TRU waste may be shipped to WIPP in drums, standard waste boxes, or drum overpacks; 1,250 cubic meters is the equivalent of about 6,000 drums (4.8 drums/cubic meter). 1 Supplement Analysis and Determination for the Proposed Characterization for Disposal of Contact-Handled Transuranic Waste at the Waste Isolation Pilot Plant (WIPP) (DOE/EIS- 0200-SA-01) 1.0 Introduction In the Record of Decision for the Department of Energy's Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (63 Fed. Reg. 3623, January 23, 1998), the Department of Energy (DOE) decided to dispose of transuranic (TRU) waste at WIPP after preparing it to meet WIPP's Waste Acceptance Criteria (WAC). In the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of

339

DOE/EIS-0200-SA-01: Supplement Analysis and Determination for the Proposed Characterization for Disposal of Contact-Handled Transuranic Waste at the Waste Isolation Pilot Plant (WIPP) (12/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CH-TRU waste may be shipped to WIPP in drums, standard waste boxes, or drum overpacks; 1,250 cubic meters is the CH-TRU waste may be shipped to WIPP in drums, standard waste boxes, or drum overpacks; 1,250 cubic meters is the equivalent of about 6,000 drums (4.8 drums/cubic meter). 1 Supplement Analysis and Determination for the Proposed Characterization for Disposal of Contact-Handled Transuranic Waste at the Waste Isolation Pilot Plant (WIPP) (DOE/EIS- 0200-SA-01) 1.0 Introduction In the Record of Decision for the Department of Energy's Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (63 Fed. Reg. 3623, January 23, 1998), the Department of Energy (DOE) decided to dispose of transuranic (TRU) waste at WIPP after preparing it to meet WIPP's Waste Acceptance Criteria (WAC). In the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of

340

The Effect of Congress' Mandate to Create Greater Efficiencies in the Characterization of Transuranic Waste through the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit  

Science Conference Proceedings (OSTI)

Effective December 1, 2003, the U.S. Congress directed the Department of Energy (DOE) to file a permit modification request with the New Mexico Environment Department (NMED) to amend the Hazardous Waste Facility Permit (hereinafter 'the Permit') at the Waste Isolation Pilot Plant (WIPP). This legislation, Section 311 of the 2004 Energy and Water Development Appropriations Act, was designed to increase efficiencies in Transuranic (TRU) waste characterization processes by focusing on only those activities necessary to characterize waste streams, while continuing to protect human health and the environment. Congressionally prescribed changes would impact DOE generator site waste characterization programs and waste disposal operations at WIPP. With this legislative impetus, in early 2004 the DOE and Washington TRU Solutions (WTS), co-permittee under the Permit, submitted a permit modification request to the NMED pursuant to Section 311. After a lengthy process, including extensive public and other stakeholder input, the NMED granted the Permittees' request in October 2006, as part of a modification authorizing disposal of Remote-Handled (RH) TRU waste at WIPP. In conclusion: Implementation of the Permit under the revised Section 311 provisions is still in its early stages. Data are limited, as noted above. In view of these limited data and fluctuations in waste feed due to varying factors, at the current time it is difficult to determine with accuracy the impacts of Section 311 on the costs of characterizing TRU waste. It is safe to say, however, that the there have been many positive impacts flowing from Section 311. The generator sites now have more flexibility in characterizing waste. Also, RH TRU waste is now being disposed at WIPP - which was not possible before the 2006 Permit modification. As previously noted, the RH modification was approved at the same time as the Section 311 modification. Had the Section 311 changes not been implemented, RH TRU waste may not have been successfully permitted for disposal at WIPP. Changes made pursuant to Section 311 helped to facilitate approval of the proposed RH TRU modifications. For example, the three scenarios for use in AK Sufficiency Determination Requests, described herein, are essential to securing approval of some RH TRU waste streams for eventual disposal at WIPP. Thus, even if characterization rates do not increase significantly, options for disposal of RH TRU waste, which may not have been possible without Section 311, are now available and the TRU waste disposal mission is being accomplished as mandated by Congress in the LWA. Also, with the Section 311 modification, the Permittees commenced room-based VOC monitoring in the WIPP repository, which is also a positive impact of Section 311. Permit changes pursuant to Section 311 were a good beginning, but much more is need to encourage more efficient methodologies in waste characterization activities for TRU mixed waste destined for WIPP. Although the Permittees now have more flexibility in characterizing waste for disposal at WIPP, the processes are still lengthy, cumbersome, and paper-intensive. As the generator sites continue to characterize waste under Section 311, more data will likely be compiled and evaluated to assess the longer term cost and technical impacts of Section 311. Also, further refinements in TRU waste characterization requirements through Permit modifications are likely in future years to eliminate, improve, and clarify remaining unnecessary and redundant Permit provisions. Continuous improvements to the TRU waste characterization program are bound to occur, resulting in even greater efficiencies in the characterization and ultimate disposal of TRU waste. (authors)

Johnson, G.J. [Washington TRU Solutions, LLC, Waste Isolation Pilot Plant, Carlsbad, New Mexico (United States); Kehrman, R.F. [Washington Regulatory and Environmental Services, Waste Isolation Pilot Plant, Carlsbad, New Mexico (United States)

2008-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

A laboratory and pilot plant scaled continuous stirred reactor separator for the production of ethanol from sugars, corn grits/starch or biomass streams  

DOE Green Energy (OSTI)

An improved bio-reactor has been developed to allow the high speed, continues, low energy conversion of various substrates to ethanol. The Continuous Stirred Reactor Separator (CSRS) incorporates gas stripping of the ethanol using a recalculating gas stream between cascading stirred reactors in series. We have operated a 4 liter lab scale unit, and built and operated a 24,000 liter pilot scale version of the bioreactor. High rates of fermentation are maintained in the reactor stages using a highly flocculent yeast strain. Ethanol is recovered from the stripping gas using a hydrophobic solvent absorber (isothermal), after which the gas is returned to the bioreactor. Ethanol can then be removed from the solvent to recover a highly concentrated ethanol product. We have applied the lab scale CSRS to sugars (glucose/sucrose), molasses, and raw starch with simultaneous saccharification and fermentation of the starch granules (SSF). The pilot scale CSRS has been operated as a cascade reactor using dextrins as a feed. Operating data from both the lab and pilot scale CSRS are presented. Details of how the system might be applied to cellulosics, with some preliminary data are also given.

Dale, M.C.; Lei, Shuiwang; Zhou, Chongde

1995-10-01T23:59:59.000Z

342

EPRI Integrated Dose Reduction Program Pilot Study  

Science Conference Proceedings (OSTI)

The Integrated Dose Reduction (IDR) project is an integral part of EPRI's support to nuclear plant radiation protection programs. The broad objective of the IDR program is to review existing and recent industry developments and provide utilities with an integrated plan for EPRI's assistance based on a plant's specific needs. This document describes a pilot test of this product at a host site, and identifies areas where EPRI's RP assessments and technical assistance can support key plant programs.

2003-11-21T23:59:59.000Z

343

Solar Pilot Plant, Phase I. Preliminary design report. Volume II, Book 2. Central receiver optical model users manual. CDRL item 2. [HELIAKI code  

DOE Green Energy (OSTI)

HELIAKI is a FORTRAN computer program which simulates the optical/thermal performance of a central receiver solar thermal power plant for the dynamic conversion of solar-generated heat to electricity. The solar power plant which this program simulates consists of a field of individual sun tracking mirror units, or heliostats, redirecting sunlight into a cavity, called the receiver, mounted atop a tower. The program calculates the power retained by that cavity receiver at any point in time or the energy into the receiver over a year's time using a Monte Carlo ray trace technique to solve the multiple integral equations. An artist's concept of this plant is shown.

None

1977-05-01T23:59:59.000Z

344

Selenium Removal by Iron Cementation from a Coal-Fired Power Plant Flue Gas Desulfurization Wastewater in a Continuous Flow System-- a Pilot Study  

Science Conference Proceedings (OSTI)

This technical update describes work funded by the Electric Power Research Institute (EPRI) and performed by MSE Technology Applications, Inc. (MSE) at a coal-fired power plant burning Powder River Basin (PRB) coal (identified in this report as Plant E). This work was based on encouraging results obtained during previous EPRI-funded work on flue gas desulfurization (FGD) wastewater treatability testing by MSE, which focused on selenium removal from a variety of FGD wastewater sources. The results from th...

2009-07-29T23:59:59.000Z

345

Central Receiver Solar Thermal Power System, Phase 1. CDRL Item 2. Pilot Plant preliminary design report. Volume III, Book 1. Collector subsystem  

DOE Green Energy (OSTI)

The central receiver system consists of a field of heliostats, a central receiver, a thermal storage unit, an electrical power generation system, and balance of plant. This volume discusses the collector field geometry, requirements and configuration. The development of the collector system and subsystems are discussed and the selection rationale outlined. System safety and availability are covered. Finally, the plans for collector portion of the central receiver system are reviewed.

Hallet, Jr., R. W.; Gervais, R. L.

1977-10-01T23:59:59.000Z

346

TVA pilot greenhouse for waste heat research  

SciTech Connect

A pilot facility for evaluating the use of waste heat from power plants, both fossil-fueled and nuclear, to heat a greenhouse was designed and built at the TVA reservation at Muscle Shoals, Ala. The simulation of waste heat was from an electric hot water heater. The subjects to be evaluated included: greenhouse environmental control system operation during one year period under wide range of climatic conditions and the crop performance, i.e., yield and disease control under various controlled-environment conditions and with various rooting media conditions. The facility design, control instrumentation, tests performed, and operating conditions obtained for airflow, air temperature, and humidity are described. No information is included on the crops produced. It is concluded that the pilot facility is providing valuable guidelines for the design of a larger demonstration plant to be located at an operating power plant. (LCL)

King, L.D.; Furlong, W.K.

1973-01-01T23:59:59.000Z

347

HANFORD MEDIUM-LOW CURIE WASTE PRETREATMENT ALTERNATIVES PROJECT FRACTIONAL CRYSTALLIZATION PILOT SCALE TESTING FINAL REPORT  

Science Conference Proceedings (OSTI)

The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.

HERTING DL

2008-09-16T23:59:59.000Z

348

Monument Valley Phytoremediation Pilot Study:  

Office of Legacy Management (LM)

1.8 1.8 U.S. Department of Energy UMTRA Ground Water Project Monument Valley Ground Water Remediation Work Plan: Native Plant Farming and Phytoremediation Pilot Study August 1998 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Project Number UGW-511-0015-10-000 Document Number U0029501 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0029501 Contents DOE/Grand Junction Office Monument Valley Ground Water Remediation Work Plan August 1998 Page v Contents Page Acronyms .

349

DOE - Office of Legacy Management -- Chemical Construction Co Linden Pilot  

Office of Legacy Management (LM)

Chemical Construction Co Linden Chemical Construction Co Linden Pilot Plant - NJ 12 FUSRAP Considered Sites Site: Chemical Construction Co., Linden Pilot Plant (NJ.12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Chemical Construction Corporation Pilot Plant Chemico NJ.12-1 NJ.12-2 Location: Linden , New Jersey NJ.12-3 Evaluation Year: 1987 NJ.12-4 Site Operations: Performed research and development operations under AEC contract to develop a process for recovering uranium, cobalt, nickel, and copper from low grade residues. NJ.12-5 NJ.12-6 NJ.12-7 Site Disposition: Eliminated - Potential for contamination considered remote due to nature and duration of the operations NJ.12-4 NJ.12-8 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.12-6

350

WIPP Status Report Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

- CH 0 0 58 414.52 0.00 OAK RIDGE NATIONAL LABORATORY - RH 0 0 73 45.99 0.00 ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE - CH 0 0 2,045 15,061.94 0.00 SANDIA NATIONAL...

351

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect

DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement the requirements of this program plan, are also referenced. The DOE regulates its own activities for radiation protection of the public under the authority of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011). The effluent and environmental monitoring activities prescribed by DOE Order 5400.5 and the DOE/EH-0173T guidance manual are designed to ensure that DOE facilities implement standards and regulations to protect members of the public and the environment against undue risk from radiation. Effluent and environmental monitoring also provide 1999 Environmental Monitoring Plan DOE/WIPP 99-2194 the data necessary to demonstrate compliance with applicable environmental protection regulations. Other federal agencies, such as the U.S. Environmental Protection Agency (EPA), are empowered through specific legislation to regulate certain aspects of DOE activities potentially affecting public health and safety or the environment. Presidential Executive Order 12088, Federal Compliance with Pollution Control Standards (43 FR 47707), requires the heads of executive agencies to ensure that all federal facilities and activities comply with applicable pollution control standards and to take all necessary actions for the prevention, control, and abatement of environmental pollution. Beyond statutory requirements, the DOE has established a general environmental protection policy. The Environmental Policy Statement (issued by then Secretary Herrington on January 8, 1986, and extended on January 7, 1987) describes the DOE's commitment to national environmental protection goals in that it conducts operations ''in an environmentally safe and sound manner . . . in compliance with the letter and spirit of applicable environmental statutes, regulations, and standards'' (DOE, 1986). This Environmental Policy Statement also states the DOE's commitment to ''good environmental management in all of its programs and at all of its facilities in order to correct existing environmental problems, to minimize risks to the environment or public health, and to anticipate and address pote

Westinghouse Electric Company Waste Isolation Division

1999-09-29T23:59:59.000Z

352

ENVIRONMENTAL ASSESSMENT FOR OTEC PILOT PLANTS  

E-Print Network (OSTI)

Plan (EDP) Ocean Thermal Energy Conver~ sion. U.S.EDP) 1977. Ocean Thermal Energy Conversion. U.S. Department

Wilde, P.

2011-01-01T23:59:59.000Z

353

CMVRTC: WRI Pilot  

NLE Websites -- All DOE Office Websites (Extended Search)

WRI PRE-FOt WRI PRE-FOt diagram The purpose of this Pre-FOT is to provide a bridge between the just-completed WRI Commercial Mobile Radio Services (CMRS) Pilot Test (Pilot Test) (31 Jan 11) and the desired large-scale FOT (2014). A bridge is needed because critical portions of the WRI CMRS Pilot Test were not completed or fully tested (e.g. pull-in/by-pass, safety sensor data present in Safety Data Message (SDM), flexible geo-fencing, carrier interface), and the Government Back Office System (GBOS) was not developed in a way to support real, large-scale WRI testing (e.g., interface not relevant to enforcement, system not stable or robust, safety sensor data not understood by developers). This effort, the WRI CMRS Pre-FOT End-to-End System Validation (WRI Pre-FOT), seeks to develop and test a complete end-to-end

354

Microbial field pilot study  

SciTech Connect

A multi-well microbially enhanced oil recovery field pilot has been performed in the Southeast Vassar Vertz Sand Unit in Payne County, Oklahoma. The primary emphasis of the experiment was preferential plugging of high permeability zones for the purpose of improving waterflood sweep efficiency. Studies were performed to determine reservoir chemistry, ecology, and indigenous bacteria populations. Growth experiments were used to select a nutrient system compatible with the reservoir that encouraged growth of a group of indigenous nitrate-using bacteria and inhibit growth of sulfate-reducing bacteria. A specific field pilot area behind an active line drive waterflood was selected. Surface facilities were designed and installed. Injection protocols of bulk nutrient materials were prepared to facilitate uniform distribution of nutrients within the pilot area. By the end of December, 1991, 82.5 tons (75.0 tonnes) of nutrients had been injected in the field. A tracer test identified significant heterogeneity in the SEVVSU and made it necessary to monitor additional production wells in the field. The tracer tests and changes in production behavior indicate the additional production wells monitored during the field trial were also affected. Eighty two and one half barrels (13.1 m[sup 3]) of tertiary oil have been recovered. Microbial activity has increased CO[sub 2] content as indicated by increased alkalinity. A temporary rise in sulfide concentration was experienced. These indicate an active microbial community was generated in the field by the nutrient injection. Pilot area interwell pressure interference test results showed that significant permeability reduction occurred. The interwell permeabilities in the pilot area between the injector and the three pilot production wells were made more uniform which indicates a successful preferential plugging enhanced oil recovery project.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Coates, J.D.; Chisholm, J.L.

1993-05-01T23:59:59.000Z

355

Pilot Systems | Open Energy Information  

Open Energy Info (EERE)

Pilot Systems Place London, United Kingdom Zip W4 4PH Sector Services Product London-based provider of metering services to business consumers. References Pilot Systems1 LinkedIn...

356

NETL: Ion Advanced Solvent CO2 Capture Pilot Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Ion Advanced Solvent CO2 Capture Pilot Project Ion Advanced Solvent CO2 Capture Pilot Project Project No.: DE-FE0013303 ION Engineering is conducting small pilot-scale (~ 0.7 MW) testing of an advanced CO2 capture solvent technology that has previously undergone bench-scale testing. The small pilot-scale testing will involve continuous long-term operation in order to gather the necessary data ultimately required for further scale-up. Activities will include the design and fabrication of the 0.5-0.7 MWe (equivalent) slipstream pilot plant; scale-up of solvent manufacturing; testing, data collection, and analysis of solvent performance; degradation and air emission analysis; modeling and simulation for the detailed preliminary and final techno-economic analyses; and decommissioning of pilot plant equipment upon completion of solvent testing. The advanced solvent is anticipated to have significant operating and capital cost advantages over other solvents currently in development. Advantages include significant reductions in parasitic load and liquid flow rates which directly translate to smaller more efficient CO2 capture processes. Make-up water and amine emissions rates will be examined during this project. There is the potential that additional solvent, system, and integration savings will be identified, which could result in further operating and capital cost reductions.

357

SkyMine Carbon Mineralization Pilot Project  

Science Conference Proceedings (OSTI)

This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

Joe Jones; Clive Barton; Mark Clayton; Al Yablonsky; David Legere

2010-09-30T23:59:59.000Z

358

The JASMINE Pilot Study  

Science Conference Proceedings (OSTI)

The methods and initial results of an extensive pilot study, the Joint Air-Sea Monsoon Interaction Experiment (JASMINE) held in the Indian Ocean during the summer of 1999, are described. The experimental design was based on the precept that the ...

P. J. Webster; E. F. Bradley; C. W. Fairall; J. S. Godfrey; P. Hacker; R. A. Houze Jr.; R. Lukas; Y. Serra; J. M. Hummon; T. D. M. Lawrence; C. A. Russell; M. N. Ryan; K. Sahami; P. Zuidema

2002-11-01T23:59:59.000Z

359

ISOE Pilot Project Update  

Science Conference Proceedings (OSTI)

This slide show introduces the Pilot Project to increase the value of Information System on Occupational Exposure (ISOE)#11;data by increasing participation and amount of data reported from the U.S., reduce the hurdles and effort in participating, streamline the process of reporting and reduce time delay, and eliminate data entry and redundant effort.

D. A. Hagemeyer D. E. Lewis

2012-05-05T23:59:59.000Z

360

Materials Guidelines for Gasification Plants  

Science Conference Proceedings (OSTI)

This report distills and condenses EPRI's knowledge of materials performance in numerous pilot and commercial-scale gasifiers into guidelines for the application and expected performance of materials in key parts of gasification-combined-cycle power plants.

1998-06-16T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Maui Electric Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Maui Electric Co Ltd Maui Electric Co Ltd Place Hawaii Utility Id 11843 Utility Location Yes Ownership I NERC Location HI Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Lanai - EV-C- Commercial Electric Vehicle Charging Service Pilot - Demand Commercial Lanai - EV-C- Commercial Electric Vehicle Charging Service Pilot - non-demand Commercial Lanai - EV-F - Commercial Public Electric Vehicle Charging Facility Service

362

Modelling piloted ignition of wood and plastics  

SciTech Connect

Highlights: Black-Right-Pointing-Pointer We model piloted ignition times of wood and plastics. Black-Right-Pointing-Pointer The model is applied on a packed bed. Black-Right-Pointing-Pointer When the air flow is above a critical level, no ignition can take place. - Abstract: To gain insight in the startup of an incinerator, this article deals with piloted ignition. A newly developed model is described to predict the piloted ignition times of wood, PMMA and PVC. The model is based on the lower flammability limit and the adiabatic flame temperature at this limit. The incoming radiative heat flux, sample thickness and moisture content are some of the used variables. Not only the ignition time can be calculated with the model, but also the mass flux and surface temperature at ignition. The ignition times for softwoods and PMMA are mainly under-predicted. For hardwoods and PVC the predicted ignition times agree well with experimental results. Due to a significant scatter in the experimental data the mass flux and surface temperature calculated with the model are hard to validate. The model is applied on the startup of a municipal waste incineration plant. For this process a maximum allowable primary air flow is derived. When the primary air flow is above this maximum air flow, no ignition can be obtained.

Blijderveen, Maarten van [TNO, Schoemakerstraat 97, 2628 VK Delft (Netherlands); University of Twente, Department of Thermal Engineering, Drienerlolaan 5, 7522 NB Enschede (Netherlands); Bramer, Eddy A. [University of Twente, Department of Thermal Engineering, Drienerlolaan 5, 7522 NB Enschede (Netherlands); Brem, Gerrit, E-mail: g.brem@utwente.nl [University of Twente, Department of Thermal Engineering, Drienerlolaan 5, 7522 NB Enschede (Netherlands)

2012-09-15T23:59:59.000Z

363

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network (OSTI)

COMMUNITY CHOICE AGGREGATION PILOT PROJECT APPENDIX H: Arnold Schwarzenegger Governor Berkeley have been investigating and analyzing a program for the implementation of Community Choice Aggregation

364

Microbial field pilot study  

Science Conference Proceedings (OSTI)

The objective of this project is to perform a microbial enhanced oil recovery field pilot in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate reducing bacteria will be stimulated to selectively plug flow paths which have been referentially swept by a prior waterflood. This will force future flood water to invade bypassed regions of the reservoir and increase sweep efficiency. This report covers progress made during the second year, January 1, 1990 to December 31, 1990, of the Microbial Field Pilot Study project. Information on reservoir ecology, surface facilities design, operation of the unit, core experiments, modeling of microbial processes, and reservoir characterization and simulation are presented in the report. To better understand the ecology of the target reservoir, additional analyses of the fluids which support bacteriological growth and the microbiology of the reservoir were performed. The results of the produced and injected water analysis show increasing sulfide concentrations with respect to time. In March of 1990 Mesa Limited Partnership sold their interest in the SEVVSU to Sullivan and Company. In April, Sullivan and Company assumed operation of the field. The facilities for the field operation of the pilot were refined and implementation was begun. Core flood experiments conducted during the last year were used to help define possible mechanisms involved in microbial enhanced oil recovery. The experiments were performed at SEVVSU temperature using fluids and inoculum from the unit. The model described in last year`s report was further validated using results from a core flood experiment. The model was able to simulate the results of one of the core flood experiments with good quality.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1992-03-01T23:59:59.000Z

365

Microbial field pilot study  

Science Conference Proceedings (OSTI)

The objective of this project is to perform a microbial enhanced oil recovery field pilot in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate reducing bacteria will be stimulated to selectively plug flow paths which have been referentially swept by a prior waterflood. This will force future flood water to invade bypassed regions of the reservoir and increase sweep efficiency. This report covers progress made during the second year, January 1, 1990 to December 31, 1990, of the Microbial Field Pilot Study project. Information on reservoir ecology, surface facilities design, operation of the unit, core experiments, modeling of microbial processes, and reservoir characterization and simulation are presented in the report. To better understand the ecology of the target reservoir, additional analyses of the fluids which support bacteriological growth and the microbiology of the reservoir were performed. The results of the produced and injected water analysis show increasing sulfide concentrations with respect to time. In March of 1990 Mesa Limited Partnership sold their interest in the SEVVSU to Sullivan and Company. In April, Sullivan and Company assumed operation of the field. The facilities for the field operation of the pilot were refined and implementation was begun. Core flood experiments conducted during the last year were used to help define possible mechanisms involved in microbial enhanced oil recovery. The experiments were performed at SEVVSU temperature using fluids and inoculum from the unit. The model described in last year's report was further validated using results from a core flood experiment. The model was able to simulate the results of one of the core flood experiments with good quality.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1992-03-01T23:59:59.000Z

366

DANSSino: a pilot version of the DANSS neutrino detector  

E-Print Network (OSTI)

DANSSino is a reduced pilot version of a solid-state detector of reactor antineutrinos (to be created within the DANSS project and installed under the industrial 3 GW(th) reactor of the Kalinin Nuclear Power Plant -- KNPP). Numerous tests performed at a distance of 11 m from the reactor core demonstrate operability of the chosen design and reveal the main sources of the background. In spite of its small size (20x20x100 ccm), the pilot detector turned out to be quite sensitive to reactor antineutrinos, detecting about 70 IBD events per day with the signal-to-background ratio about unity.

I. Alekseev; V. Belov; V. Brudanin; M. Danilov; V. Egorov; D. Filosofov; M. Fomina; Z. Honz; A. Kobyakin; D. Medvedev; R. Mizuk; E. Novikov; A. Olshevsky; S. Rozov; N. Rumyantseva; V. Rusinov; A. Salamatin; Ye. Shevchik; M. Shirchenko; Yu. Shitov; A. Starostin; D. Svirida; E. Tarkovsky; I. Tikhomirov; E. Yakushev; I. Zhitnikov; D. Zinatulina

2013-05-15T23:59:59.000Z

367

Carbon Capture Pilots (Kentucky) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carbon Capture Pilots (Kentucky) Carbon Capture Pilots (Kentucky) Eligibility Commercial Fed. Government StateProvincial Govt Utility Program Information Kentucky Program Type...

368

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network (OSTI)

COMMUNITY CHOICE AGGREGATION PILOT PROJECT APPENDIX A: Arnold Schwarzenegger Governor Community in this report. #12;1 COMMUNITY CHOICE AGGREGATION PILOT PROJECT APPENDIX A Community Choice Aggregation in the Community Choice Aggregation Demonstration project and assesses the costs and availability of renewable

369

NETL: Mercury Emissions Control Technologies - Pilot Testing of Mercury  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing of Mercury Oxidation Catalysts Project Summary Testing of Mercury Oxidation Catalysts Project Summary URS Group, Inc., Austin, TX, will demonstrate at the pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion, and the use of a wet flue gas desulfurization (FGD) system downstream to remove the oxidized mercury at high efficiency. The project's pilot tests, conducted at electric generating plants using wet flue gas desulfurization systems and particulate collection systems, will be conducted for periods up to 14 months to provide data for future, full-scale designs. Mercury-oxidation potential will be measured periodically to provide long-term catalyst life data. The project is applicable to about 90,000 megawatts of generation capacity. Project partners are the Electric Power Research Institute, Palo Alto, CA, which will co-manage and co-fund the pilot tests, and five utilities.

370

SOLERAS - Solar Energy Water Desalination Project: Exxon Research and Engineering. System design final report. Volume 3. Appendices pilot plan and design details and subsystem direct cost support  

Science Conference Proceedings (OSTI)

Details of the design of a water desalination solar pilot plant in Yanbu, Saudi Arabia are presented. The major subsystems of the plant are defined, including solar energy collection and simulation, energy storage, energy delivery, reverse osmosis/multiple effect distillation, water storage, waste disposal, backup power generators, controls and instrumentation data acquisition, facilities and enclosures, and computers. A list of the plant equipment and a set of process flow diagrams are provided. A cost analysis of the pilot plant is included. (BCS)

Not Available

1985-01-01T23:59:59.000Z

371

Portland General Electric Company Pilot Evaluation and  

E-Print Network (OSTI)

the billing software were omitted, and there is no factor for free riders. The analysis assumed that all, 2004 DIRECT LOAD CONTROL PILOT FOR ELECTRIC WATER HEAT #12;1 PGE Direct Load Control Pilot for Electric direct load control pilot for electric water heat, called "Direct Load Control Pilot for Electric Water

372

Arizona Public Service Co | Open Energy Information  

Open Energy Info (EERE)

Public Service Co Public Service Co Place Arizona Utility Id 803 Utility Location Yes Ownership I NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png AGRICULTURAL WIND MACHINE SERVICE RATE SCHEDULE E-40 Commercial CLASSIFIED SERVICE - RATE SCHEDULE EPR-6 (NET METERING) Commercial COMMUNITY POWER - FLAGSTAFF SANDVIG 04 - PILOT RIDER RATE - RATE SCHEDULE

373

Consumers Energy Co | Open Energy Information  

Open Energy Info (EERE)

Energy Co Energy Co Jump to: navigation, search Name Consumers Energy Co Place Michigan Utility Id 4254 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png A-1 Residential A-3 Residential Experimental Advanced Renewable Program AR Commercial GP-Dynamic Pricing Pilot-Customer Voltage Level 1 (CVL 1) Commercial

374

Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 2, Chapter C, Appendix C1--Chapter C, Appendix C3 (beginning), Revision 3  

Science Conference Proceedings (OSTI)

This volume contains appendices for the following: Rocky Flats Plant and Idaho National Engineering Laboratory waste process information; TRUPACT-II content codes (TRUCON); TRUPACT-II chemical list; chemical compatibility analysis for Rocky Flats Plant waste forms; chemical compatibility analysis for waste forms across all sites; TRU mixed waste characterization database; hazardous constituents of Rocky Flats Transuranic waste; summary of waste components in TRU waste sampling program at INEL; TRU waste sampling program; and waste analysis data.

Not Available

1993-03-01T23:59:59.000Z

375

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network (OSTI)

COMMUNITY CHOICE AGGREGATION PILOT PROJECT APPENDIX B: Arnold Schwarzenegger Governor Project Reports on California Public Utilities Commission Decisions on Community Choice Aggregation Prepared For Participants FROM: John Dalessi, NCI SUBJECT: CPUC COMMUNITY CHOICE AGGREGATION PHASE 1 DECISION On December 16

376

City of Whittemore, Iowa (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Utility Location Yes Ownership M NERC Location MRO Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes Activity Retail Marketing Yes Alt Fuel Vehicle...

377

Design considerations for a steam-injection pilot with in-situ foaming  

Science Conference Proceedings (OSTI)

This report reviews the necessary aspects of the planning, operation, evaluation, environmental impact and cost to implement a field pilot of steam injection with in-situ foaming. The Stanford University Petroleum Research Institute (SUPRI) is planning to implement such a pilot in Kern County, California. The cost of the pilot will be shared by the US Department of Energy and an oil company. Some important aspects of drilling and completion programs and their specifications, permits from regulatory bodies, and downhole tools to improve steam stimulation are discussed. The essential surface facilities which include water treatment plant, steam generator, demulsifier and dehydrator are considered. The necessary laboratory research in support of the pilot has been recommended. The formation evaluation and reservoir engineering effort for the pilot has been divided into three phases: reservoir definition, reservoir monitoring and post-pilot study. Appropriate techniques applicable to each phase of the test have been discussed. The environmental impact regulations as related to the steam injection process have been considered. In particular, the environmental problems associated with the burning of crude oil and desulfurization of flue gas have been discussed. Other environmental considerations such as solid and liquid waste disposal, health and safety are also discussed. An estimate of the cost of this field test is presented. Three scenarii (for pilots with high, medium, and low investment potentials, respectively) are presented. Since this report was prepared, a specific site for the supri pilot has been chosen. Appendices G and H present the details on this site.

Siddiqui, M.H.; Sanyal, S.K.; Horn, A.J.

1982-08-01T23:59:59.000Z

378

First TRUPACT-III Shipment Arrives Safely at the Waste Isolation Pilot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRUPACT-III Shipment Arrives Safely at the Waste Isolation TRUPACT-III Shipment Arrives Safely at the Waste Isolation Pilot Plant First TRUPACT-III Shipment Arrives Safely at the Waste Isolation Pilot Plant August 29, 2011 - 12:00pm Addthis Media Contact Lauren Milone lauren.milone@em.doe.gov 301-903-3731 Washington, D.C. - The U.S. Department of Energy (DOE) announced today that the first shipment of transuranic waste using the newly approved shipping package known as the TRUPACT-III safely arrived at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. The shipment, which originated at the Savannah River Site (SRS) in South Carolina, arrived at WIPP on August 25. The new shipping package - the Transuranic Package Transporter Model 3 or TRUPACT-III - allows the Department to package and ship large-sized transuranic waste in a single box that would otherwise

379

First TRUPACT-III Shipment Arrives Safely at the Waste Isolation Pilot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First TRUPACT-III Shipment Arrives Safely at the Waste Isolation First TRUPACT-III Shipment Arrives Safely at the Waste Isolation Pilot Plant First TRUPACT-III Shipment Arrives Safely at the Waste Isolation Pilot Plant August 29, 2011 - 12:00pm Addthis Media Contact Lauren Milone lauren.milone@em.doe.gov 301-903-3731 Washington, D.C. - The U.S. Department of Energy (DOE) announced today that the first shipment of transuranic waste using the newly approved shipping package known as the TRUPACT-III safely arrived at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. The shipment, which originated at the Savannah River Site (SRS) in South Carolina, arrived at WIPP on August 25. The new shipping package - the Transuranic Package Transporter Model 3 or TRUPACT-III - allows the Department to package and ship large-sized transuranic waste in a single box that would otherwise

380

Pilot Application of Risk Informed Safety Margins to Support Nuclear Plant Long-Term Operation Decisions: Impacts on Safety Margins of Extended Power Uprates for BWR Station Blackout Events  

Science Conference Proceedings (OSTI)

The risk-informed safety margin characterization (RISMC) framework is a technically robust approach that could be used to analyze nuclear power plant (NPP) safety margins for issues of significance to NPP safety. This report describes application of the RISMC framework to analysis of the impacts of an extended power uprate (EPU) to a boiling water reactor (BWR) station blackout (SBO) event, with emphasis on changes in safety margins due to elevated power levels. The analysis focused on probabilistic ...

2013-08-27T23:59:59.000Z

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

The DOE Water Cycle Pilot Study  

E-Print Network (OSTI)

The DOE Water Cycle Pilot Study N.L. Miller 1 *, A.W. KingCycle Research Strategy, DOE SC-0043, Office of BiologicalLBNL Report LBNL-53826. The DOE Water Cycle Pilot Study is

2003-01-01T23:59:59.000Z

382

Expansion capacity of an SX unit in uranium process pilot tests  

Science Conference Proceedings (OSTI)

The rising price of uranium has led uranium producers to increase their plant capacity. The new project proposed to increase capacity is based on processing low-grade uranium by heap leaching. It is necessary to modify the plant, particularly the solvent extraction unit, to handle the increased flow. The goal of our study is to determine the minimal changes necessary to process the whole flow. Several stages have been carried out (i) thermodynamic modelling of the solvent extraction process to determine the capacities of the SX plant and the impact of the modification and (ii) pilot tests at the plant of the different configurations proposed by modelling. This paper presents results of the pilot tests performed at the plant. (authors)

Courtaud, B.; Auger, F.; Morel, P. [AREVA-NC/SEPA, Bessines sur Gartempe (France); Sanoussi, M. [SOMAIR, Arlit (Niger)

2008-07-01T23:59:59.000Z

383

User computer system pilot project  

Science Conference Proceedings (OSTI)

The User Computer System (UCS) is a general purpose unclassified, nonproduction system for Mound users. The UCS pilot project was successfully completed, and the system currently has more than 250 users. Over 100 tables were installed on the UCS for use by subscribers, including tables containing data on employees, budgets, and purchasing. In addition, a UCS training course was developed and implemented.

Eimutis, E.C.

1989-09-06T23:59:59.000Z

384

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network (OSTI)

COMMUNITY CHOICE AGGREGATION PILOT PROJECT APPENDIX E: Arnold Schwarzenegger Governor Community in this report. #12;«CCA_Name» - DRAFT - COMMUNITY CHOICE AGGREGATION IMPLEMENTATION PLAN «Date Choice Aggregation Implementation Plan Template Prepared For: California Energy Commission Prepared By

385

Piloting the Smart Grid | Open Energy Information  

Open Energy Info (EERE)

Piloting the Smart Grid Piloting the Smart Grid Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Piloting the Smart Grid Focus Area: Crosscutting Topics: Best Practices Website: www.smartgridnews.com/artman/uploads/1/Piloting_the_smart_grid__05-29- Equivalent URI: cleanenergysolutions.org/content/piloting-smart-grid Language: English Policies: "Deployment Programs,Regulations,Financial Incentives" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Demonstration & Implementation Regulations: Cost Recovery/Allocation This paper provides guidance regarding when and how Smart Grid piloting studies should be conducted along with examples from several recent pilots that involved dynamic pricing, a key element of the smart grid. Smart Grid

386

NETL: Pilot Test of a Nanoporous, Super-hydrophobic Membrane Contactor  

NLE Websites -- All DOE Office Websites (Extended Search)

Pilot Scale Evaluation of an Advanced Carbon Sorbent-Based Process for Post-combustion CO2 Capture Pilot Scale Evaluation of an Advanced Carbon Sorbent-Based Process for Post-combustion CO2 Capture Project No.: DE-FE00013123 SRI is incorporating an advanced carbon capture sorbent-based process in a 1 MWe slipstream pilot plant that will reduce the parasitic plant load by using a CO2 capture sorbent requiring a reduced amount of steam. The process is based on advanced carbon sorbents having a low heat of adsorption, high CO2 adsorption capacity, and excellent selectivity. Design and performance data will be produced by testing the sorbent using the slipstream from an operating pulverized coal (PC)-fired boiler under realistic conditions and continuous long-term operation. The acquired data will be used for further development and commercialization of the process.

387

DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposals for Management of New Mexico Waste Isolation Proposals for Management of New Mexico Waste Isolation Pilot Plant DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot Plant June 20, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati --The U.S. Department of Energy (DOE) today issued a Final Request for Proposal for management and operations of the Waste Isolation Pilot Plan (WIPP) located in Carlsbad, New Mexico. The successful contractor will manage the WIPP site and DOE's National Transuranic Waste (TRU) program. DOE anticipates awarding a competitive, cost-plus-award-fee contract with an approximate value of $135 million per year, for five years. There will be an option to extend the contract for five additional years. The overall mission of the WIPP and the National TRU program is to protect

388

AZ CO2 Storage Pilot  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Storage Pilot Regional Carbon Sequestration Partnerships Initiative Review Meeting Pittsburgh, Pennsylvania October 7, 2008 John Henry Beyer, Ph.D. WESTCARB Program Manager, Geophysicist 510-486-7954, jhbeyer@lbl.gov Lawrence Berkeley National Laboratory Earth Sciences Division, MS 90-1116 Berkeley, CA 94720 2 WESTCARB region has major CO2 point sources 3 WESTCARB region has many deep saline formations - candidates for CO2 storage WESTCARB also created GIS layers for oil/gas fields and deep coal basins Source: DOE Carbon Sequestration Atlas of the United States and Canada 4 - Aspen Environmental - Bevilacqua-Knight, Inc. Arizona Utilities CO2 Storage Pilot Contracting and Funding Flow Department of Energy National Energy Technology Laboratory Lawrence Berkeley National

389

WRI Pilot Test 2012.pub  

NLE Websites -- All DOE Office Websites (Extended Search)

Phase 2: Pilot Test Phase 2: Pilot Test Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U.S. Department of Energy under Contract number DE-AC05-00OR22725 Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies Research Brief T he U.S. Department of Transportation (DOT) Federal Motor Carrier Safety Administration (FMCSA) has commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the status of the vehicles and their drivers. It is

390

Pilot chargeback system program plan  

SciTech Connect

This planning document outlines the steps necessary to develop, test, evaluate, and potentially implement a pilot chargeback system at the Idaho National Engineering and Environmental Laboratory for the treatment, storage, and disposal of current waste. This pilot program will demonstrate one system that can be used to charge onsite generators for the treatment and disposal of low-level radioactive waste. In FY 1997, mock billings will begin by July 15, 1997. Assuming approvals are received to do so, FY 1998 activities will include modifying the associated automated systems, testing and evaluating system performance, and estimating the amount generators will spend for waste storage, treatment, and disposal in FY 1999. If the program is fully implemented in FY 1999, generators will pay actual, automated bills for waste management services from funds transferred to their budgets from Environmental Management.

Smith, P.

1997-03-01T23:59:59.000Z

391

Plant design: Integrating Plant and Equipment Models  

Science Conference Proceedings (OSTI)

Like power plant engineers, process plant engineers must design generating units to operate efficiently, cleanly, and profitably despite fluctuating costs for raw materials and fuels. To do so, they increasingly create virtual plants to enable evaluation of design concepts without the expense of building pilot-scale or demonstration facilities. Existing computational models describe an entire plant either as a network of simplified equipment models or as a single, very detailed equipment model. The Advanced Process Engineering Co-Simulator (APECS) project (Figure 5) sponsored by the U.S. Department of Energy's National Energy Technology Laboratory (NETL) seeks to bridge the gap between models by integrating plant modeling and equipment modeling software. The goal of the effort is to provide greater insight into the performance of proposed plant designs. The software integration was done using the process-industry standard CAPE-OPEN (Computer Aided Process EngineeringOpen), or CO interface. Several demonstration cases based on operating power plants confirm the viability of this co-simulation approach.

Sloan, David (Alstrom Power); Fiveland, Woody (Alstrom Power); Zitney, S.E.; Osawe, Maxwell (Ansys, Inc.)

2007-08-01T23:59:59.000Z

392

Renewable Energy Pilot Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Pilot Program Renewable Energy Pilot Program Renewable Energy Pilot Program < Back Eligibility Investor-Owned Utility Rural Electric Cooperative Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Heating & Cooling Wind Program Info State Louisiana Program Type Other Policy Provider Louisiana Public Service Commission In June 2010, the Louisiana Public Service Commission (LPSC) unanimously approved a Renewable Energy Pilot Program for the state. The final implementation plan was adopted in November 2010. The goal of the pilot program is to determine whether a renewable portfolio standard is suitable for Louisiana. The pilot program has two major components: the Research

393

Pilot-Scale Evaluation of Mercury Oxidation Across SCR Catalysts  

Science Conference Proceedings (OSTI)

Measurements were conducted to evaluate the mercury chemical reactions using a pilot-scale SCR operating on flue gas slipstream from an eastern bituminous (~1.75% sulfur, ~750 ppm Cl) coal-fired power plant. Tests were conducted by the Western Kentucky University (WKU) to evaluate the impact of flue gas constituents (HCl, Cl2, SO2, SO3, NH3:NOx) as well as two commercially-available SCR catalysts. The results and data were reviewed by Reaction Engineering International, who prepared this technical update...

2005-12-23T23:59:59.000Z

394

Pilot-Scale Evaluation of Mercury Oxidation Across SCR Catalysts  

Science Conference Proceedings (OSTI)

This study evaluated the effects of addition of various acid gas species on the oxidation of elemental mercury across two commercial SCR catalysts in a pilot SCR reactor operating on a slipstream from a Powder River Basin coal-fired power plant. Tests were conducted by the Western Kentucky University (WKU) to evaluate the impact of flue gas constituents (HCl, HF, HBr, HI, SO3, NH3:NO), operating conditions, and catalyst design on mercury oxidation. The results and data were reviewed by Reaction Engineer...

2007-03-29T23:59:59.000Z

395

PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS  

SciTech Connect

This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, ''Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems,'' during the time period January 1, 2003 through March 31, 2003. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project cofunders. URS Group is the prime contractor. The mercury control process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates with the byproducts from the FGD system. The current project is testing previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, to provide engineering data for future full-scale designs. The pilot-scale tests will continue for up to 14 months at each of two sites to provide longer-term catalyst life data. This is the sixth full reporting period for the subject Cooperative Agreement. During this period, project efforts included continued operation of the pilot unit with three catalysts, conducting catalyst activity measurements, and procuring the fourth catalyst, all for the GRE Coal Creek pilot unit site. Laboratory efforts were also conducted to support catalyst selection for the second pilot unit site, at CPS' Spruce Plant. This technical progress report provides an update on these efforts.

Gary M. Blythe

2003-05-01T23:59:59.000Z

396

PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS  

Science Conference Proceedings (OSTI)

This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, ''Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems,'' during the time-period April 1, 2003 through June 30, 2003. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project cofunders. URS Group is the prime contractor. The mercury control process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates with the byproducts from the FGD system. The current project is testing previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, to provide engineering data for future full-scale designs. The pilot-scale tests will continue for approximately 14 months at each of two sites to provide longer-term catalyst life data. This is the seventh full reporting period for the subject Cooperative Agreement. During this period, project efforts included continued operation of the first pilot unit, conducting catalyst activity measurements, installing sonic horns for on-line catalyst cleaning, and installing the fourth catalyst, all for the GRE Coal Creek site. CPS began installation of the second mercury oxidation catalyst pilot unit at their Spruce Plant during the quarter. Laboratory efforts were conducted to support catalyst selection for that second pilot unit. This technical progress report provides an update on these efforts.

Gary M. Blythe

2003-07-01T23:59:59.000Z

397

NETL - Slipstream Pilot-Scale Demonstration of a Novel Amine-Based  

NLE Websites -- All DOE Office Websites (Extended Search)

Slipstream Pilot-Scale Demonstration of a Novel Amine-Based Post-Combustion Process Technology for CO2 Capture from Coal-Fired Power Plant Flue Gas Slipstream Pilot-Scale Demonstration of a Novel Amine-Based Post-Combustion Process Technology for CO2 Capture from Coal-Fired Power Plant Flue Gas Project No.: DE-FE0007453 Continuous mini test plant used for selecting the best performer of 70 different solvents. Continuous mini test plant used for selecting the best performer of 70 different solvents. Linde LLC is designing, constructing, and testing a pilot-scale (1 MWe), post-combustion carbon dioxide (CO2) capture plant using a novel amine-based solvent. Today, solvent based technologies are the leading option for post-combustion CO2 capture from large coal-fired power plants, as they have been applied in other applications on a large scale. However, a number of challenges exist in the use of traditionally available

398

Community Based Renewable Energy Production Incentive (Pilot...  

Open Energy Info (EERE)

History Share this page on Facebook icon Twitter icon Community Based Renewable Energy Production Incentive (Pilot Program) (Maine) This is the approved revision of this...

399

The Pilot Study R&D Task  

Science Conference Proceedings (OSTI)

The Pilot Study R&D Task. EDT a complex of four tasks: 1) Detection of Entities limited to five types: PER ORG GPE ...

400

Argonne's Pilot Electric Vehicle Charging Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne's Pilot Electric Vehicle Charging Project solar array and charging station Solar array and charging station. View larger image. As part of Argonne's continuing efforts to...

Note: This page contains sample records for the topic "alt-fuel pilot plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Hanford Waste Vitrification Plant  

SciTech Connect

The Hanford Waste Vitrification Plant (HWVP) is being designed to immobilize pretreated Hanford high-level waste and transuranic waste in borosilicate glass contained in stainless steel canisters. Testing is being conducted in the HWVP Technology Development Project to ensure that adapted technologies are applicable to the candidate Hanford wastes and to generate information for waste form qualification. Empirical modeling is being conducted to define a glass composition range consistent with process and waste form qualification requirements. Laboratory studies are conducted to determine process stream properties, characterize the redox chemistry of the melter feed as a basis for controlling melt foaming and evaluate zeolite sorption materials for process waste treatment. Pilot-scale tests have been performed with simulated melter feed to access filtration for solids removal from process wastes, evaluate vitrification process performance and assess offgas equipment performance. Process equipment construction materials are being selected based on literature review, corrosion testing, and performance in pilot-scale testing. 3 figs., 6 tabs.

Larson, D.E.; Allen, C.R. (Pacific Northwest Lab., Richland, WA (United States)); Kruger, O.L.; Weber, E.T. (Westinghouse Hanford Co., Richland, WA (United States))

1991-10-01T23:59:59.000Z

402

Advanced engineering environment pilot project.  

SciTech Connect

The Advanced Engineering Environment (AEE) is a concurrent engineering concept that enables real-time process tooling design and analysis, collaborative process flow development, automated document creation, and full process traceability throughout a product's life cycle. The AEE will enable NNSA's Design and Production Agencies to collaborate through a singular integrated process. Sandia National Laboratories and Parametric Technology Corporation (PTC) are working together on a prototype AEE pilot project to evaluate PTC's product collaboration tools relative to the needs of the NWC. The primary deliverable for the project is a set of validated criteria for defining a complete commercial off-the-shelf (COTS) solution to deploy the AEE across the NWC.

Schwegel, Jill; Pomplun, Alan R.; Abernathy, Rusty (Parametric Technology Corporation, Needham, MA)

2006-10-01T23:59:59.000Z

403

Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems  

SciTech Connect

This document summarizes progress on Cooperative Agreement DE-FC26-04NT41992, ''Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems'', during the time-period January 1 through March 31, 2006. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in flue gas from coal combustion, and the use of a wet flue gas desulfurization (FGD) system downstream to remove the oxidized mercury at high efficiency. The project is being co-funded by the U.S. DOE National Energy Technology Laboratory, EPRI, Great River Energy (GRE), TXU Generation Company LP, the Southern Company, and Duke Energy. URS Group is the prime contractor. The mercury control process under development uses honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone FGD systems. Oxidized mercury is removed in the wet FGD absorbers and leaves with the byproducts from the FGD system. The current project is testing previously identified catalyst materials at pilot scale and in a commercial form to provide engineering data for future full-scale designs. The pilot-scale tests will continue for approximately 14 months or longer at each of two sites to provide longer-term catalyst life data. Pilot-scale wet FGD tests are being conducted periodically at each site to confirm the ability to scrub the catalytically oxidized mercury at high efficiency. This is the ninth reporting period for the subject Cooperative Agreement. During this period, project efforts primarily consisted of operating the catalyst pilot units at the TXU Generation Company LP's Monticello Steam Electric Station and at Georgia Power's Plant Yates. Two catalyst activity measurement trips were made to Plant Yates during the quarter. This Technical Progress Report presents catalyst activity results from the oxidation catalyst pilot unit at Plant Yates and discusses the status of the pilot unit at Monticello.

Gary M. Blythe

2006-03-31T23:59:59.000Z

404

Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems  

SciTech Connect

This document summarizes progress on Cooperative Agreement DE-FC26-04NT41992, ''Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems'', during the time-period January 1 through March 31, 2006. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in flue gas from coal combustion, and the use of a wet flue gas desulfurization (FGD) system downstream to remove the oxidized mercury at high efficiency. The project is being co-funded by the U.S. DOE National Energy Technology Laboratory, EPRI, Great River Energy (GRE), TXU Generation Company LP, the Southern Company, and Duke Energy. URS Group is the prime contractor. The mercury control process under development uses honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone FGD systems. Oxidized mercury is removed in the wet FGD absorbers and leaves with the byproducts from the FGD system. The current project is testing previously identified catalyst materials at pilot scale and in a commercial form to provide engineering data for future full-scale designs. The pilot-scale tests will continue for approximately 14 months or longer at each of two sites to provide longer-term catalyst life data. Pilot-scale wet FGD tests are being conducted periodically at each site to confirm the ability to scrub the catalytically oxidized mercury at high efficiency. This is the ninth reporting period for the subject Cooperative Agreement. During this period, project efforts primarily consisted of operating the catalyst pilot units at the TXU Generation Company LP's Monticello Steam Electric Station and at Georgia Power's Plant Yates. Two catalyst activity measurement trips were made to Plant Yates during the quarter. This Technical Progress Report presents catalyst activity results from the oxidation catalyst pilot unit at Plant Yates and discusses the status of the pilot unit at Monticello.

Gary M. Blythe

2006-03-31T23:59:59.000Z

405

Alternative Fuel and Advanced Technology Vehicles Pilot Program...  

Open Energy Info (EERE)

Pilot Program Emissions Benefit Tool Jump to: navigation, search Tool Summary Name: Alternative Fuel and Advanced Technology Vehicles Pilot Program Emissions Benefit Tool...

406

NERSC Launches Data-intensive Science Pilot Program  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC Launches Data-intensive Science Pilot Program NERSC Launches Data-intensive Science Pilot Program DOE Researchers Eligible to Apply for Resources, Expertise April 12, 2012...

407

Waste Isolation Pilot Plant TruDock crane system analysis  

SciTech Connect

The WIPP TruDock crane system located in the Waste Handling Building was identified in the WIPP Safety Analysis Report (SAR), November 1995, as a potential accident concern due to failures which could result in a dropped load. The objective of this analysis is to evaluate the frequency of failure of the Tru