Powered by Deep Web Technologies
Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Alaska Power Administration combined financial statements, schedules and supplemental reports, September 30, 1996 and 1995  

SciTech Connect (OSTI)

This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Alaska Power Administration`s (Alaska) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 combined statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Alaska`s internal control structure disclosed no reportable conditions that could have a material effect on the financial statements. The auditors also considered the overview and performance measure data for completeness and material consistency with the basic financial statements, as noted in the internal control report. The auditor`s report on compliance with laws and regulations disclosed no instances of noncompliance by Alaska.

NONE

1997-04-01T23:59:59.000Z

2

Alaska Power Administration combined financial statements, schedules and supplemental reports, September 30, 1995 and 1994  

SciTech Connect (OSTI)

This report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Alaska Power Administration`s (Alaska) financial statements as of September 30, 1995. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on Alaska`s internal control structure and on compliance with laws and regulations are also provided. The Alaska Power Administration operates and maintains two hydroelectric projects that include five generator units, three power tunnels and penstocks, and over 88 miles of transmission line. Additional information about Alaska Power Administration is provided in the notes to the financial statements. The 1995 financial statement audit was made under the provisions of the Inspector General Act (5 U.S.C. App.), as amended, the Chief Financial Officers (CFO) Act (31 U.S.C. 1500), and Office of Management and Budget implementing guidance to the CFO Act. The auditor`s work was conducted in accordance with generally accepted government auditing standards. To fulfill the audit responsibilities, the authors contracted with the independent public accounting firm of KPMG Peat Marwick (KPMG) to conduct the audit for us, subject to review. The auditor`s report on Alaska`s internal control structure disclosed no reportable conditions that could have a material effect on the financial statements. The auditor also considered the overview and performance measure data for completeness and material consistency with the basic financial statements, as noted in the internal control report. The auditor`s report on compliance with laws and regulations disclosed no instances of noncompliance by Alaska.

NONE

1995-12-31T23:59:59.000Z

3

Title 18 Alaska Administrative Code Chapter 70 Water Quality...  

Open Energy Info (EERE)

Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 70 Water Quality StandardsLegal Published NA Year Signed or Took Effect 1997 Legal Citation Alaska...

4

Title 18 Alaska Administrative Code Chapter 50 Air Quality Control...  

Open Energy Info (EERE)

Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 50 Air Quality ControlLegal Published NA Year Signed or Took Effect 2004 Legal Citation Alaska...

5

Alaska Administrative Code - Title 11, Chapter 195 - Anadromous...  

Open Energy Info (EERE)

95 - Anadromous Fish Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Alaska Administrative Code - Title 11, Chapter 195 -...

6

Title 18 Alaska Administrative Code Chapter 78 Underground Storage...  

Open Energy Info (EERE)

Underground Storage Tanks Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 78...

7

Title 11 Alaska Administrative Code Chapter 93 Water Management...  

Open Energy Info (EERE)

Code Chapter 93 Water Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code...

8

Alaska Gateway School District Adopts Combined Heat and Power...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Alaska Gateway School District Adopts Combined Heat and Power Alaska Gateway School District Adopts Combined Heat and Power May 7, 2013 - 12:00am Addthis In Tok, Alaska, the...

9

Obama Administration's Rural Tour Stops in Western Alaska | Department of  

Broader source: Energy.gov (indexed) [DOE]

Administration's Rural Tour Stops in Western Alaska Administration's Rural Tour Stops in Western Alaska Obama Administration's Rural Tour Stops in Western Alaska August 13, 2009 - 12:00am Addthis WASHINGTON D.C. - Four Cabinet Secretaries brought the Obama Administration's Rural Tour to rural Alaska today, with stops in Bethel and Hooper Bay, representing the largest Cabinet-level delegation to visit the state. Energy Secretary Steven Chu, Housing and Urban Development Secretary Shaun Donovan, Education Secretary Arne Duncan, and Agriculture Secretary Tom Vilsack held a public forum and indivdual stakeholder meetings in Bethel. The Secretaries toured a school, a housing development and wind turbines in Hooper Bay, a coastal fishing village. President Obama announced the launch of his Administration's Rural Tour in

10

Alaska Electric Light&Power Co (Alaska) EIA Revenue and Sales...  

Open Energy Info (EERE)

August 2008. Monthly Electric Utility Sales and Revenue Data Short Name 2008-08 Utility Company Alaska Electric Light&Power Co (Alaska) Place Alaska Start Date 2008-08-01 End Date...

11

Title 18 Alaska Administrative Code Chapter 60 Solid Waste Management...  

Open Energy Info (EERE)

Solid Waste Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 60 Solid...

12

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

agreement (Agreement) between the BC Hydro and Power uthority (BCH) and the Bonneville Power Administration (BP A), jointly the Parties, which BA for accounting purposes is...

13

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of four Power Marketing Administrations in the United States, Southwestern markets hydroelectric power in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas from 24 U.S....

14

Bonneville Power Administration Administrator Steve Wright  

E-Print Network [OSTI]

Bonneville Power Administration Administrator Steve Wright PO Box 12999 Portland, OR 97208 Dear salmon, clean, renewable energy, and a healthy economy. The Bonneville Power Administration (BPA largely failed to meet their legal salmon recovery responsibilities. I urge the Bonneville Power

15

Alaska - Seds - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA) Indexed Site

Alaska - Seds - U.S. Energy Information Administration (EIA) Alaska - Seds - U.S. Energy Information Administration (EIA) The page does not exist for . To view this page, please select a state: United States Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware District of Columbia Florida Georgia Hawaii Idaho Illinois Indiana Iowa Kansas Kentucky Louisiana Maine Maryland Massachusetts Michigan Minnesota Mississippi Missouri Montana Nebraska Nevada New Hampshire New Jersey New Mexico New York North Carolina North Dakota Ohio Oklahoma Oregon Pennsylvania Rhode Island South Carolina South Dakota Tennessee Texas Utah Vermont Virginia Washington West Virginia Wisconsin Wyoming The page does not exist for . To view this page, please select a state: Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware District of Columbia Florida

16

Alaska - Alaska Administrative Code - Title 3 - Commerce, Community...  

Open Energy Info (EERE)

Administrative Code - Title 3 - Commerce, Community and Economic Development - January 2012 Supplement Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

17

Bonneville Power Administrator Compares  

E-Print Network [OSTI]

Bonneville Power Administrator Compares Missouri Basin Reservoirs with Pacific Northwest's by Pat-16 was the dinner speech of a former Nebraskan from Schuyler, James Jura. Now administrator of the Bonneville Power Administration, Portland, Ore., Jura has been with Bonneville for the past 10 ears. He spoke to the group

Nebraska-Lincoln, University of

18

Records Schedule-Alaska Power Authority  

Broader source: Energy.gov (indexed) [DOE]

-109 PREVIOUS EDITION NOT USABLE STANDARD FORM SF 1 15 (REV 3-91) -109 PREVIOUS EDITION NOT USABLE STANDARD FORM SF 1 15 (REV 3-91) Prescr~bed by NARA 36 CFR 1228 REQUEST FOR RECORDS DISPOSITION AUTHORITY To NATIONAL ARCIIIVES and RECORDS ADMINISTRATION (NIR) WASHINGTON, DC 20408 1 FROM (Agency or establ~shment) Department o f Energy 2 MAJOR SUBDIVISION Alaska Power Administration 3 MINOR SUBDIVISION 4 NAME OF PERSON WITH WHOM TO CONFER Carol Holmberg JOB NUMBER N1-447-97- 1 DATE RECEIVED .'I+ 46 NOTIFICATION TO AGENCY In accordance ~ 7 t h thc prov~sions of 44 U S C 3303a, the d~spos~tion request, including amendments, is approved except for items that may be marked "dlspos~tion not approved or "withdrawn" In column 10 5 TELEPHONE (907)586-7405 DATE 1 t,- -'?x 6 AGENCY CERTIFICATION I hearby certify that I am author~zed to act for thls agency in matters pertalnlng to the dlpsositi

19

Southeastern Power Administration | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Southeastern Power Administration Southeastern Power Administration Southeastern Power Administration View All Maps Addthis...

20

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 ANNUAL REPORT 7 ANNUAL REPORT Southwestern Power Administration Letter to the Secretary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 About Southwestern. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Accomplishments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Supplementary Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

o Includes option to elect into Shared Rate Plan, if room under limit Bonneville Power Administration 061708 Revision (Original version issued externally April 11, 2008)...

22

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

May 22, 2014 Lake Texoma Hydropower Generation to Remain Low for Near Future TULSA, OK - Southwestern Power Administration (Southwestern) announced today that in response to...

23

Alaska Electric Light&Power Co (Alaska) EIA Revenue and Sales...  

Open Energy Info (EERE)

Alaska) EIA Revenue and Sales - July 2008 Jump to: navigation, search EIA Monthly Electric Utility Sales and Revenue Data for Alaska Electric Light&Power Co for July 2008. Monthly...

24

Alaska Power and Telephone Co | Open Energy Information  

Open Energy Info (EERE)

and Telephone Co and Telephone Co (Redirected from Alaska Power Co) Jump to: navigation, search Name Alaska Power and Telephone Co Place Washington Utility Id 219 Utility Location Yes Ownership I NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Sch No. A1-(Residential & Small Commercial Rates) Residential Sch No. A2-(Bulk Power Rates) Commercial

25

Alaska Electric Light&Power Co | Open Energy Information  

Open Energy Info (EERE)

Light&Power Co Light&Power Co Jump to: navigation, search Name Alaska Electric Light&Power Co Place Alaska Utility Id 213 Utility Location Yes Ownership I NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial & Government Dual Fuel Commercial Experimental Off-Peak Electric Vehicle Charging 10:00 pm - 7:00 am Commercial General Residential Residential Large Commercial Commercial Off-Peak/Heat storage from 10pm-6am Large Commercial Commercial

26

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ENT OFFS Department of Energy Bonneville Power Administration P.O. Box 3621 ' 91 FS F P Portland, Oregon 97208-3621 PUBLIC AFFAIRS April 20, 2011 In reply refer to: DK-7...

27

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- NT oc Department of Energy Bonneville Power Administration * r ' P.Q. Box 3621 Portland, Oregon 97208-3621 PUBLIC AFFAIRS September 30. 201 1 In reply refer to: DK-7 Richard...

28

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is your final response to your request for information that you made to the Bonneville Power Administration (BPA) under the Freedom of Information Act (FOIA), 5 U.S.C. 552. You...

29

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

http:www.bpa.gov PR 02 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Thursday, Jan. 23, 2014 CONTACT: Kevin Wingert, 503-230-4140971-207-8390 or 503-230-5131 BPA...

30

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is a final response to your request for information that you made to the Bonneville Power Administration (BPA) under the Freedom of Information Act (FOIA), 5 USC 552. You...

31

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contact Us U.S. Department of Energy Southwestern Power Administration Gore Maintenance Office Mailing Address: P.O. Box 728 Gore, OK 74435-0728 Delivery Address: 14165 East 143rd...

32

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Loveland Area Projects November 29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development of the 2025 PMI Proposal * 2025 PMI Proposal * 2025 PMI Comment Period & Proposal Information * Questions 3 Overview of Western Area Power Administration (Western) * One of four power marketing administrations within the Department of Energy * Mission: Market and deliver reliable, renewable, cost-based Federal hydroelectric power and related services within a 15-state region of the central and western U.S. * Vision: Provide premier power marketing and transmission services Rocky Mountain Region (RMR) is one of five regional offices 4 Rocky Mountain Region

33

Alaska Electric Light&Power Co (Alaska) EIA Revenue and Sales...  

Open Energy Info (EERE)

November 2008 Jump to: navigation, search EIA Monthly Electric Utility Sales and Revenue Data for Alaska Electric Light&Power Co for November 2008. Monthly Electric Utility Sales...

34

Alaska Electric Light&Power Co (Alaska) EIA Revenue and Sales...  

Open Energy Info (EERE)

December 2008 Jump to: navigation, search EIA Monthly Electric Utility Sales and Revenue Data for Alaska Electric Light&Power Co for December 2008. Monthly Electric Utility Sales...

35

Steve Wright, Administrator Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TDO 541.744.3659 ww"" .;'.I-ut': October 10,2008 Steve Wright, Administrator Bonneville Power Administration P.O. Box 3621 Portland, OR 97208-3621 Re: Increase in Slice Product...

36

SOUTHWESTERN POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

01 01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix, A or B to Subpart D. (2) There are no extraordinary circumstances related to the proposal that may affect the Significance of the environmental effects of the proposal; and (3) The proposal is not "connected" to other actions with potentially significant impacts, is not related to

37

SOUTHWESTERN POWER ADMINISTRATION  

Broader source: Energy.gov (indexed) [DOE]

9/01 9/01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix, A or B to Subpart D. (2) There are no extraordinary circumstances related to the proposal that may affect the Significance of the environmental effects of the proposal; and (3) The proposal is not "connected" to other actions with potentially significant impacts, is not related to

38

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Skip Navigation Links Skip Navigation Links Annual Performance Plan Annual Report Mission Organization Strategic Plan SWPA - Overview Video System Map About the Agency Southwestern Power Administration was established in 1943 by the Secretary of the Interior as a Federal Agency that today operates within the Department of Energy under the authority of Section 5 of the Flood Control Act of 1944. As one of four Power Marketing Administrations in the United States, Southwestern markets hydroelectric power in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas from 24 U.S. Army Corps of Engineers multipurpose dams. By law, Southwestern's power is marketed and delivered primarily to public bodies such as rural electric cooperatives and municipal utilities. Southwestern has over one hundred such "preference" customers, and these

39

Anchorage Municipal Light and Power (Alaska) EIA Revenue and...  

Open Energy Info (EERE)

Data 1 Previous | Next Retrieved from "http:en.openei.orgwindex.php?titleAnchorageMunicipalLightandPower(Alaska)EIARevenueandSales-December2008&oldid19263...

40

,"Alaska Natural Gas Price Sold to Electric Power Consumers ...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Alaska Natural Gas Price Sold to Electric Power Consumers (Dollars per Thousand Cubic...

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Title 5 Alaska Administrative Code Section 95.011 Waters Important...  

Open Energy Info (EERE)

Alaska Administrative Code Section 95.011 Waters Important to Anadromous Fish Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

42

Title 20 Alaska Administrative Code Section 25.105 Oil & Gas...  

Open Energy Info (EERE)

Oil & Gas Well Abandonment Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 20 Alaska Administrative Code Section...

43

Title 20 Alaska Administrative Code Section 25.112 Oil & Gas...  

Open Energy Info (EERE)

Oil & Gas Well Plugging Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 20 Alaska Administrative Code...

44

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News Items News Items Skip Navigation Links December 7, 2012 Southwestern Helps Restore Power After Hurricane Sandy September 27, 2012 New Administrator April 27, 2012 Table Rock Visitor Center April 24, 2012 WFEC Earth Day Publications Skip Navigation Links Annual Performance Plan Annual Report Newsletters Press Releases Strategic Plan SWPA - Overview Video System Map December 7, 2012 Southwestern Helps Restore Power After Hurricane Sandy Southwestern Aids Sandy Recovery Line crews from Southwestern repair distribution lines in Tom's River, New Jersey, following Hurricane Sandy. In the aftermath of Hurricane Sandy in early November 2012, Southwestern Power Administration sent several line, substation, and right-of-way brush crews and 30 pieces of heavy equipment to help restore the electrical grid

45

Bonneville Power Administration (BPA)  

Broader source: Energy.gov (indexed) [DOE]

Staff version which still requires senior executive review Staff version which still requires senior executive review Office of Office of Human Capita Human Capital Management Management Bonneville Power Administration Risk Informed Human Capital - Workforce Plan 2007-2009 September 15, 2006 2007 BPA Risk Informed Human Capital - Workforce Plan Table of Contents INTRODUCTION............................................................................................................. 5 Impact of the 2006 Workforce Plan ..............................................................................................6 BPA Strategic Objectives as drivers of the WP .......................................................................... 6 I. CONTEXT ................................................................................................................... 6

46

Alaska Power and Telephone Co | Open Energy Information  

Open Energy Info (EERE)

Telephone Co Telephone Co Jump to: navigation, search Name Alaska Power and Telephone Co Place Washington Utility Id 219 Utility Location Yes Ownership I NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Sch No. A1-(Residential & Small Commercial Rates) Residential Sch No. A2-(Bulk Power Rates) Commercial Sch No. A3-(Bulk Power Rates for Large Customers)

47

Running head: GEOTHERMAL POWER PRODUCTION 1 Geothermal Power Production for Emmonak, Alaska  

E-Print Network [OSTI]

January 2009. This paper researches the possibility of using geothermal energy as an alternative energy Energy Investment cost .................................................... 40 Geothermal use in AlaskaRunning head: GEOTHERMAL POWER PRODUCTION 1 Geothermal Power Production for Emmonak, Alaska Anthony

Scheel, David

48

PP-36 Bonneville Power Administration  

Broader source: Energy.gov [DOE]

Presidential Permit authorizing Bonneville Power Administration to construct, operate, and maintain electric transmission facilities from U.S.- Canada Border.

49

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Occupational Occupational Safety & Health Administration Safety The safety and well-being of all Southwestern Power Administration employees are the firm and continuing responsibilities of every member of management. Each employee, in turn, shares with management the responsibility for his or her own safety by performing his or her duties in a safe and conscientious manner, complying with all safety rules and regulations, and observing the provisions of Executive Order 12196, "Occupational Safety and Health Programs for Federal Employees." Southwestern's Recordable Accident Frequency Rate (RAFR) for Calendar Year 2011 (Jan - Dec 2011) was 1.28, and for Fiscal Year 2011 (Oct 2010 - Sep 2011) the RAFR was 0.64. Additionally, 2011 marked the nineteenth consecutive

50

Alaska Electric Light&Power Co (Alaska) EIA Revenue and Sales...  

Open Energy Info (EERE)

EIA Monthly Electric Utility Sales and Revenue Data for Alaska Electric Light&Power Co for February 2009. Monthly Electric Utility Sales and Revenue Data Short Name 2009-02 Utility...

51

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Student Employment Opportunities Student Employment Opportunities There are currently no student employment vacancies. Please check here regularly for career opportunities at Southwestern Power Administration. Learn more about the type of work engineers perform at Southwestern: Electric Power Marketing Engineering and Planning Reliability Compliance and Transmission Policy Resources and Rates Apply At USAJOBS USAJobs is the official job site of the US Federal Government. Please visit this site to see all job vacancies within Southwestern, the Department of Energy, and the Federal Government. Please pay close attention to the closing date in the "Open Period" section as well as the information in the "Who May Be Considered" section on the first page of each announcement to determine if you are

52

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Western Area Power Administration Customer Meeting The meeting will begin at 12:30 pm MST We have logged on early for connectivity purposes Please stand-by until the meeting begins Please be sure to call into the conference bridge at: 888-989-6414 Conf. Code 60223 If you have connectivity issues, please contact: 866-900-1011 1 Introduction  Welcome  Introductions  Purpose of Meeting ◦ Status of the SLCA/IP Rate ◦ SLCA/IP Marketing Plan ◦ Credit Worthiness Policy ◦ LTEMP EIS update ◦ Access to Capital  Handout Materials http://www.wapa.gov/crsp/ratescrsp/default.htm 2 SLCA/IP Rate 3 1. Status of Repayment 2. Current SLCA/IP Firm Power Rate (SLIP-F9) 3. Revenue Requirements Comparison Table 4.SLCA/IP Rate 5. Next Steps

53

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 2, 2014 Smith Named as New Deputy Assistant Administrator Smith Named as New Deputy Assistant Administrator Barbara Smith Barbara Smith, a former Liaison Specialist for...

54

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disability Employment Disability Employment Duty Locations Equal Employment New Employee Orientation Reasonable Accommodation Student Employment Opportunities Pathways Skip Navigation Links USAJOBS Veteran Employment Opportunities Feds Hire Vets Current Vacancy Announcements There are currently no employment vacancies. Please check here regularly for career opportunities at Southwestern Power Administration. Apply At USAJOBS USAJobs is the official job site of the US Federal Government. Please visit this site to see all job vacancies within Southwestern, the Department of Energy, and the Federal Government. Please pay close attention to the closing date in the "Open Period" section as well as the information in the "Who May Be Considered" section on the first page of each announcement to determine if you are

55

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About this site About this site This Web site is the official Web site of the Southwestern Power Administration. It is part of a Federal computer system used to accomplish Federal functions and is monitored for security purposes to ensure it remains available to all users and to protect information in the system. By accessing this Web site, you are expressly consenting to these monitoring activities. Accessibility Southwestern is committed to providing the most up-to-date, relevant information to its stakeholders and to members of the general public, including those with disabilities and/or limited English proficiency. If you are unable to access information about Southwestern due to the presentation of information in this Web site, or if you have any questions, concerns, or comments you would like to share with us, please contact

56

PP-10 Bonneville Power Administrator  

Broader source: Energy.gov [DOE]

Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

57

PP-46 Bonneville Power Administration  

Broader source: Energy.gov [DOE]

Presidential Permit authorizing Bonneville Power Administration to contruct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

58

Energy Department Names Elliot Mainzer Bonneville Power Administration Administrator  

Broader source: Energy.gov [DOE]

The Energy Department announced that Elliot Mainzer has been appointed Administrator for the Bonneville Power Administration (BPA).

59

Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

v*Zy- i , . v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ Power Administration Follow-up to Nov. 25, 2008 Transition Meeting Undeveloped Transmission Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line to relieve congestion in the Sacramento area. In addition, Western has rights-of- way for many transmission lines that could be rebuilt to increase transmission capacity. For example, Western's Tracy-Livermore 230-kV line is a single circuit line but the existing towers could support a double circuit line. These rights-of-way would have to

60

Reading File Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reading File Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 POWER SERVICES In reply refer to: PG-5 Ms. Renata Kurschner Director, Generation Resource...

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Courses Instructors NERC Continuing Education Power Operations Training Center You'll find the "Power" of learning at Southwestern's Power Operations Training Center (POTC). POTC's...

62

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rate Schedules Skip Navigation Links Excess Energy Hydro Peaking Power Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative (Rayburn) Hydro Power and Energy Sold to...

63

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

minimize customers switching between options to create simplicity in reporting and administration and avoid potential oversights. If circumstances change and Option 2 becomes...

64

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 minimize switching back and forth between options to create simplicity in reporting and administration. If circumstances change and Option 2 becomes burdensome for a utility BPA...

65

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

exceptions include: traffic signals, exit signs, kitchen equipment, network power management, power strips, showerheads, clothes washers, water heaters and ag stock...

66

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Conservation Rate Credit (CRC) - A current funding mechanism that provides a discounted power rate to participating utilities, conditioned on documented expenditures on qualifying...

67

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Open Access Tariff Standards of Conduct Transmission Planning Open Access Tariff Pursuant to an agreement between Southwestern and Southwest Power Pool, Inc. (SPP), which became...

68

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

equipment, and services to support its mission of marketing and delivering Federal hydroelectric power: 1569138161-kV field equipment such as circuit breakers, coupling...

69

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environment Southwestern's mission of marketing and delivering Federal hydroelectric power fully supports the U.S. Department of Energy's strategic goal of improving...

70

Title 5 Alaska Administrative Code Chapter 95 Protection of Fish...  

Open Energy Info (EERE)

Chapter 95 Protection of Fish and Game Habitat Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 5 Alaska...

71

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News & Publications News & Publications Annual Performance Plan Annual Report Newsletters Strategic Plan SWPA - Overview Video System Map Press Releases 2012 Skip Navigation Links Turner Named Southwestern Administrator 2009 Skip Navigation Links New Deputy Administrator Selected for Liaison Office Ice Storm Damage Update - March 24, 2009 Ice Storm Damage Update - March 12, 2009 Ice Storm Damage Update - March 10, 2009 Ice Storm Damage Update - March 05, 2009 Ice Storm Damage Update - March 04, 2009 Ice Storm Damage Update - March 02, 2009 Ice Storm Damage Update - February 23, 2009 Ice Storm Damage Update - February 17, 2009 Ice Storm Damage Update - February 13, 2009 Ice Storm Damage Update - February 12, 2009 Ice Storm Damage Update - February 11, 2009 Ice Storm Damage Update - February 10, 2009

72

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Next Steps 5:00 Adjourn About the Post-2011 Review Process BPA invited its public power customers and regional stakeholders to participate in the Energy Efficiency Post-2011...

73

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

09 Nosh Makujina Boise 208.631.5961 nosh.makujina@energysmartindustrial.com Clearwater Power Co. 12109 Richard Jarvis Kalispell 406.257.3013 rich.jarvis@energysmartindustrial.co...

74

Bonneville Power Administration (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration (WFP) Bonneville Power Administration (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy....

75

Western Area Power Administration Borrowing Authority, Recovery...  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Borrowing Authority, Recovery Act Western Area Power Administration Borrowing Authority, Recovery Act Microsoft Word - PSRP May 15 2009 WAPA...

76

Comments of the Bonneville Power Administration | Department...  

Broader source: Energy.gov (indexed) [DOE]

the Bonneville Power Administration Comments of the Bonneville Power Administration BPA appreciates the opportunity to provide comments and information and submits the following...

77

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2012 Conference 2012 Conference 2011 Conference 2010 Conference 2009 Conference 2008 Conference 2007 Conference 2006 Conference Hydropower Conference The Southwestern Regional Hydropower Council and Conference is held annually among Southwestern, the U.S. Army Corps of Engineers (Corps), and the Southwestern Power Resources Association to assess non-routine work to be performed at the Corps hydropower projects from which Southwestern markets power. To date, over $246 million has been approved for funding under an innovative agreement among Southwestern, the Corps, and City Water & Light Plant of the City of Jonesboro, Arkansas, to keep these hydropower projects operating and to keep the power flowing to our wholesale customers and, ultimately, to the Nation. Contact hydroconf@swpa.gov

78

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Skip Navigation Links Skip Navigation Links DOE Order No. RA 6120.2 Repayment Process Under Department of Energy Order No. RA 6120.2, Southwestern conducts power repayment studies each year to determine the amount of revenue required to recover costs assigned to power, including the annual cost of marketing power, the cost of operating and maintaining the generating facilities, and, for the Integrated System and Sam Rayburn, the cost of the original investment in building the facilities, plus interest. Southwestern conducts three such studies, one for the Integrated System, one for Sam Rayburn Dam, and one for Robert D. Willis Dam. Upon completion of the studies, Southwestern conducts a formal public participation process, including solicitation of public comments on any proposed revenue

79

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Conference 8 Conference 2007 Conference 2006 Hydropower Conference The 2006 Regional Hydropower Council and Conference was hosted by the Kansas City District of the U.S. Army Corps of Engineers in Kansas City, Missouri. Click the links below to view materials from the conference. June 7, 2006 Corps Budget Development Process Denison Rewind Project Little Rock District Drought Contingency Plan Narrows Rewind Project Ozark Major Rehabilitation Project Southwestern Drought Operations Southwest Power Pool (SPP) Presentation Tulsa District Drought Operations Webbers Falls Major Rehabilitation Project Whitney Rehabilitation Project June 8, 2006 Environmental Protection Agency (EPA) Clean Water Act Presentation Kansas City District Briefings Little Rock District Briefings Sam Rayburn System Restoration

80

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Conference 2 Conference 2011 Conference 2009 Conference 2008 Conference 2007 Conference 2006 Conference 2010 Hydropower Conference The 2010 Regional Hydropower Council and Conference was hosted by the Little Rock District of the U.S. Army Corps of Engineers in Branson, Missouri. Click the links below to view materials from the council and conference. June 8-9, 2010, Council Skip Navigation Links 2010 Hydropower Council Agenda FY 2011 Proposed Project Packet FY 2012 Preliminary Project Packet June 9-10, 2010, Conference Skip Navigation Links 2010 Hydropower Conference Agenda AECC Hydroelectric Generation Facilities Corps - New Budget Concept Denison Turbine Rehabilitation Planning Hydrokinetic Projects on the Mississippi River Kansas City District Projects Impacting Federal Power

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

09 Meeting 09 Meeting 2008 Meeting 2007 Meeting 2006 Meeting 2010 Hydropower Meeting The 2010 Regional Hydropower Council and Meeting were hosted by the Little Rock District of the U.S. Army Corps of Engineers in Branson, Missouri. Click the links below to view materials from the council and meeting. June 8-9, 2010, Council Skip Navigation Links 2010 Hydropower Council Agenda FY 2011 Proposed Project Packet FY 2012 Preliminary Project Packet June 9-10, 2010, Meeting Skip Navigation Links 2010 Hydropower Meeting Agenda AECC Hydroelectric Generation Facilities Corps - New Budget Concept Denison Turbine Rehabilitation Planning Hydrokinetic Projects on the Mississippi River Kansas City District Projects Impacting Federal Power Little Rock District Projects Impacting Federal Hydropower

82

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Meeting 8 Meeting 2007 Meeting 2006 Meeting 2009 Hydropower Meeting The 2009 Regional Hydropower Council and Meeting were hosted by the Tulsa District of the U.S. Army Corps of Engineers in Tulsa, Oklahoma. Click the links below to view materials from the council and meeting. June 9-10, 2009, Council Skip Navigation Links 2009 Hydropower Council Agenda FY 2010 Proposed Project Packet FY 2010 Proposed Rayburn/Willis Packet FY 2011 Preliminary Project Packet June 10-11, 2009, Meeting Skip Navigation Links 2009 Hydropower Meeting Agenda Corps Southwest Region NERC Activities DOE Water Power Research & Development Future Energy Resource Mix Little Rock District Projects Impacting Hydropower MOA Subagreement Status NERC Compliance Requirements Ozark Rehab Pumpback PMA Perspective

83

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Conference 8 Conference 2007 Conference 2006 Conference 2009 Hydropower Conference The 2009 Regional Hydropower Council and Conference was hosted by the Tulsa District of the U.S. Army Corps of Engineers in Tulsa, Oklahoma. Click the links below to view materials from the council and conference. June 9-10, 2009, Council Skip Navigation Links 2009 Hydropower Council Agenda FY 2010 Proposed Project Packet FY 2010 Proposed Rayburn/Willis Packet FY 2011 Preliminary Project Packet June 10-11, 2009, Conference Skip Navigation Links 2009 Hydropower Conference Agenda Corps Southwest Region NERC Activities DOE Water Power Research & Development Future Energy Resource Mix Little Rock District Projects Impacting Hydropower MOA Subagreement Status NERC Compliance Requirements Ozark Rehab

84

400kW Geothermal Power Plant at Chena Hot Springs, Alaska | Open...  

Open Energy Info (EERE)

Springs, Alaska Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: 400kW Geothermal Power Plant at Chena Hot Springs, Alaska Abstract This document...

85

SOUTHWESTERN POWER ADMINISTRATION ANNUAL REPORT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ADMINISTRATION ADMINISTRATION ANNUAL REPORT 20 10 This page inTenTionally lefT blank. S o u t h w e S t e r n p o w e r a d m i n i S t r at i o n pa g e 1 2010 a n n u a l r e p o r t Table of conTenTs Letter to the Secretary ------------------------------------------------------------------------------------- 3 Southwestern System Map ------------------------------------------------------------------------------- 4 About Southwestern --------------------------------------------------------------------------------------- 5 Supplementary Information ------------------------------------------------------------------------------ 6 Southwestern Federal Power System Energy Production -------------------------------

86

Me Stephen J. Wright Administrator Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6, 200R Me Stephen J. Wright Administrator Bonneville Power Administration P.O. Box 3621 Portland. Oregon 97208-362 Re: Slice Product Subscription Dear Steve: As public agency...

87

Southeastern Power Administration | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southeastern Power Administration Southeastern Power Administration Search Search form Search Southeastern Power Administration Southeastern Power Administration Services Services Home Rate Schedules Acquisition Program Competitive Resource Strategies Annual Reports SEPA FOIA Power Operations Power Operations Home How it Works Generation Quick Facts Mission About Us About Us Home News News Home Press Releases Career Opportunities SEPA History SEPA Video Offices Southeastern Power Administration Southeastern Power Administration Power Operations Click to view a map of SEPA power operations. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina

88

Land Record System PIA, Bonneville Power Administration | Department...  

Broader source: Energy.gov (indexed) [DOE]

Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record...

89

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208) Biological Opinion (BiOp). Bonneville Power Administration (BPA) supports the effort of developing a common-3621 ENVIRONMENT, FISH AND WILDLIFE May 18, 2009 In reply refer to: KEW-4 Ms. Nancy Leonard Northwest Power

90

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 and Conservation Council (Council) members have asked that Bonneville Power Administration (Bonneville) make its in the rating process. As you know, the Northwest Power Act obligates Bonneville to use its authorities to fund

91

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 about the amount and nature of cost-sharing offered. As a result, Bonneville Power Administration, Chairman Northwest Power and Conservation Council 851 S.W. Sixth Ave., Suite 1100 Portland, OR 97204

92

Southeastern Power Administration | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Southeastern Power Administration Southeastern Power Administration Southeastern Power Administration Power Operations Click to view a map of SEPA power operations. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina More schedules Annual Reports December 28, 2012 Southeastern Power Administration 2012 Annual Report This report reflects our agency's programs,accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012.

93

NREL GIS Data: Alaska Low Resolution Concentrating Solar Power Resource |  

Open Energy Info (EERE)

Alaska Low Resolution Concentrating Solar Power Resource Alaska Low Resolution Concentrating Solar Power Resource Dataset Summary Description Abstract: Monthly and annual average solar resource potential for Alaska. Purpose: Provide information on the solar resource potential for Alaska. The insolation values represent the average solar energy available to a flat plate collector, such as a photovoltaic panel, oriented due south at an angle from horizontal equal to the latitude of the collector location. Supplemental_Information: This data provides monthly average and annual average daily total solar resource averaged over surface cells of approximatley 40 km by 40 km in size. This data was developed from the Climatological Solar Radiation (CSR) Model. The CSR model was developed by the National Renewable Energy Laboratory for the U.S. Department of Energy. Specific information about this model can be found in Maxwell, George and Wilcox (1998) and George and Maxwell (1999). This model uses information on cloud cover, atmostpheric water vapor and trace gases, and the amount of aerosols in the atmosphere to calculate the monthly average daily total insolation (sun and sky) falling on a horizontal surface. The cloud cover data used as input to the CSR model are an 7-year histogram (1985-1991) of monthly average cloud fraction provided for grid cells of approximately 40km x 40km in size. Thus, the spatial resolution of the CSR model output is defined by this database. The data are obtained from the National Climatic Data Center in Ashville, North Carolina, and were developed from the U.S. Air Force Real Time Nephanalysis (RTNEPH) program. Atmospheric water vapor, trace gases, and aerosols are derived from a variety of sources. The procedures for converting the collector at latitude tilt are described in Marion and Wilcox (1994). Where possible, existing ground measurement stations are used to validate the data. Nevertheless, there is uncertainty associated with the meterological input to the model, since some of the input parameters are not avalible at a 40km resolution. As a result, it is believed that the modeled values are accurate to approximately 10% of a true measured value within the grid cell. Due to terrain effects and other micoclimate influences, the local cloud cover can vary significantly even within a single grid cell. Furthermore, the uncertainty of the modeled estimates increase with distance from reliable measurement sources and with the complexity of the terrain. Units are in watt hours.

94

Bonneville Power Administration's Purchasing of Energy Savings  

E-Print Network [OSTI]

BONNEVILLE POWER ADMINISTRATION'S PURCHASE OF ENERGY SAVINGS Harold (Skip) Schick Leslie E. McMillan Bonneville Power Administration Port1and, Oregon INTRODUCTION The Bonneville Power Administration (BPA) is conducting a commercial... of several activities BPA is conductin9 to develop the capabil ity to conserve energy in the com mercial sector of electrical energy use. This paper describes the benefits of the approach, the program des ign, 1essons 1earned through field testing...

Schick, H.

95

Bonneville Power Administration Attachment P Oversupply Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Provider will displace all such Generators on a pro-rata basis. Bonneville Power Administration Attachment P Oversupply Management Protocol Open Access Transmission...

96

Independent Oversight Review, Bonneville Power Administration...  

Office of Environmental Management (EM)

and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. The review is one of several BPA initiatives to improve...

97

Power Marketing Administration Emergency Management Program Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual establishes emergency management policy and requirements for emergency planning, preparedness, readiness assurance, and response for the Department's Power Marketing Administrations. Cancels DOE O 5500.11.

2008-09-18T23:59:59.000Z

98

PP-10-1 Bonneville Power Administrator  

Broader source: Energy.gov [DOE]

Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

99

Energy Department Names Elliot Mainzer Bonneville Power Administration...  

Broader source: Energy.gov (indexed) [DOE]

Elliot Mainzer has been appointed Administrator for the Bonneville Power Administration (BPA), effective today. As one of four Power Marketing Administrations within the...

100

Alaska - AS 42.05.431 - Power of Commission to Fix Rates | Open...  

Open Energy Info (EERE)

- Power of Commission to Fix Rates Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Alaska - AS 42.05.431 - Power of Commission...

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Bonneville Power Administration Categorical Exclusion Determinations: Bonneville Power Administration Categorical Exclusion Determinations issued by Bonneville Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration August 26, 2013 CX-010720: Categorical Exclusion Determination Monroe-Custer #2 Access Roads CX(s) Applied: B1.3

102

Categorical Exclusion Determinations: Southwestern Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

Southwestern Power Southwestern Power Administration Categorical Exclusion Determinations: Southwestern Power Administration Categorical Exclusion Determinations issued by Southwestern Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD August 6, 2013 CX-010879: Categorical Exclusion Determination Transmission Line 3005, Structure 290 Replacement CX(s) Applied: B4.6 Date: 08/06/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration July 25, 2013 CX-010880: Categorical Exclusion Determination Transmission Line 3016, Access Road Acquisition Project CX(s) Applied: B1.24 Date: 07/25/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration July 22, 2013 CX-010716: Categorical Exclusion Determination Short Mountain Access Road Easement Acquisition CX(s) Applied: B1.24

103

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, March 5, 2014 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 Mainzer taps Gendron, Ehli to lead Power and...

104

EIS-0076: Bonneville Power Administration Alumax  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) developed this EIS for the proposed Alumax primary aluminum reduction plant to determine the environmental, economic and social impacts of plant construction, as well as potential power supply alternatives for BPA.

105

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 to Independent Scientific Review Panel (ISRP) review, Bonneville Power Administration (BPA) and the Columbia: Mr. Micah Russell, CREST (electronic mail) #12;Oregon Clatsop County ~ City of Astoria ~ City

106

Southwestern Power Administration (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Southwestern Power Administration (WFP) Southwestern Power Administration (WFP) Southwestern Power Administration (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy. This will enable the agency to have the right number of people with the right competencies in the right positions at the right time to successfully achieve agency's business objectives today and in the future. Southwestern Power Administration Responsible Contacts Thomas Wheeler Director, Workforce Analysis & Planning Division E-mail thomas.wheeler@hq.doe.gov Phone (202) 586-8481 More Documents & Publications Before the Subcommittee on Water and Power - House Natural Resources Committee Before the Subcommittee on Water and Power - Committee on Natural Resources Before the House Natural Resources Subcommittee on Water and Power

107

A History of the Southeastern Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Southeastern Power Administration Southeastern Power Administration 1990-2010 SERVING SOUTHEAST the Distribu teD by us Department of energy southeastern Power Administration 2012 A History of the Southeastern Power Administration 1990-2010 SERVING SOUTHEAST the ii Project contribu tors Sponsor us Department of energy, southeastern Power Administration Contracting Agency us Army corps of engineers, Mobile District Author Patricia stallings, brockington and Associates, inc. Design and Editing john cason and Alicia sullivan, brockington and Associates, inc. iii AcknowleDgeMents The author gratefully acknowledges the efforts of many individuals who contributed to make this history possible. Mrs. Melissa chastain sease initiated the project and worked tirelessly to facilitate an excellent research environment and also established an efficient

108

How Power Marketing Administrations Market Power and Work with Tribes  

Broader source: Energy.gov (indexed) [DOE]

How Power Marketing Administrations Market Power and Work with How Power Marketing Administrations Market Power and Work with Tribes Webinar How Power Marketing Administrations Market Power and Work with Tribes Webinar April 24, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. The country's federal Power Marketing Administrations (PMAs) have valuable generation and transmission assets and have the potential to promote renewable energy development within their respective footprints. Get information on PMA assets and operations, examples of past cooperation with Tribes, and how to work with PMAs to promote future economic growth

109

eGIS Portal PIA, Bonneville Power Administration | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power...

110

EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska |  

Broader source: Energy.gov (indexed) [DOE]

2: Combined Power and Biomass Heating System, Fort Yukon, 2: Combined Power and Biomass Heating System, Fort Yukon, Alaska EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska SUMMARY DOE (lead agency), Denali Commission (cooperating agency) and USDA Rural Utilities Services (cooperating agency) are proposing to provide funding to support the final design and construction of a biomass combined heat and power plant and associated district heating system to the Council of Athabascan Tribal Governments and the Gwitchyaa Zhee Corporation. The proposed biomass district heating system would be located in Fort Yukon Alaska. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD May 6, 2013 EA-1922: Finding of No Significant Impact Combined Power and Biomass Heating System, Fort Yukon, Alaska

111

EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska |  

Broader source: Energy.gov (indexed) [DOE]

2: Combined Power and Biomass Heating System, Fort Yukon, 2: Combined Power and Biomass Heating System, Fort Yukon, Alaska EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska SUMMARY DOE (lead agency), Denali Commission (cooperating agency) and USDA Rural Utilities Services (cooperating agency) are proposing to provide funding to support the final design and construction of a biomass combined heat and power plant and associated district heating system to the Council of Athabascan Tribal Governments and the Gwitchyaa Zhee Corporation. The proposed biomass district heating system would be located in Fort Yukon Alaska. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD May 6, 2013 EA-1922: Finding of No Significant Impact Combined Power and Biomass Heating System, Fort Yukon, Alaska

112

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

a separate billing as perhaps the fundamental concern we have about future regional energy planning. If BPA's Energy Future The Northwest Power and Conservation Council (Council's) draft Fifth Power Plan (draft planDepartment of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208

113

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 Columbia River Power System (FCRPS) has been recommended for funding. These projects provide Bonneville, Chairman Northwest Power Planning Council 851 SW Sixth Avenue, Suite 1100 Portland, OR 97204-1348 Dear

114

Bonneville Power Administration 1998 Annual Report.  

SciTech Connect (OSTI)

This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

115

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

June 4, 2013 June 4, 2013 CX-010433: Categorical Exclusion Determination Memaloose Meadows Land Acquisition CX(s) Applied: B1.25 Date: 06/04/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010436: Categorical Exclusion Determination Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration June 3, 2013 CX-010435: Categorical Exclusion Determination De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010434: Categorical Exclusion Determination LaPine Substation Shunt Reactor Addition CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

116

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

July 30, 2012 July 30, 2012 CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration July 30, 2012 CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration July 27, 2012 CX-008676: Categorical Exclusion Determination Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

117

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

July 29, 2010 July 29, 2010 CX-003233: Categorical Exclusion Determination Purchase of Conservation Easements on Cottom and Beyeler Properties CX(s) Applied: B1.25 Date: 07/29/2010 Location(s): Lemhi County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003235: Categorical Exclusion Determination Adolfson-Feleding Property (Lavaside Property) Purchase CX(s) Applied: B1.25 Date: 07/22/2010 Location(s): Bingham County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination

118

EIS-0183: Bonneville Power Administration Business Plan  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration is considering how to respond to the challenges of a dynamic electric utility industry, and prepared this environmental impact statement to analyze environmental and socioeconomic impacts associated with alternatives to address this challenge.

119

Bonneville Power Administration FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

40 13 Bonneville Power Administration FOR IMMEDIATE RELEASE December 26, 2013 CONTACT: Teresa Waugh, 503-230-7536 or 503-230-5131 BPA seeks comment on draft study of proposed...

120

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 13 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Monday, July 29, 2013 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 BPA project receives innovation award for new...

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Tuesday, Jan. 27, 2014 CONTACT: Kevin Wingert, 503-230-4140971-207-8390 or 503-230-5131 Middle school teams from...

122

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Friday, Feb. 15, 2013 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 BPA launches Science Lab videos for National...

123

Bonneville Power Administration Program Specific Recovery Plan...  

Energy Savers [EERE]

Power Administration Program Specific Recovery Plan Microsoft Word - PSRP May 15 2009 BPA Final.docx More Documents & Publications Microsoft Word - PSRP Updates 6-25-10v2...

124

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

March 10, 2011 March 10, 2011 CX-005419: Categorical Exclusion Determination Ostrander Line Swap CX(s) Applied: B4.11 Date: 03/10/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration March 7, 2011 CX-005418: Categorical Exclusion Determination Birch Creek Radio Tower CX(s) Applied: B4.6 Date: 03/07/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 3, 2011 CX-005411: Categorical Exclusion Determination Troutdale Substation Control House CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Troutdale, Oregon Office(s): Bonneville Power Administration

125

About Us - Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

selling its products and services. BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several other...

126

Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration  

Broader source: Energy.gov (indexed) [DOE]

11, 2013 11, 2013 Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration Karen Boardman, Health Safety and Security, Director, National Training Center Wayne Elias, Fossil Energy, Director, FE-42 Gordon Fox, Office of Science, Director, SC-31.2 Mark Gilbertson, Environmental Management, DAS, Site Restoration Larry Harp, Division of Engineering and Planning, South Western Power Administration Joshua Hill, Federal Energy Regulatory Commission, Acting Director, Logistics Mgmt. Div. Doug Hooker, Energy Efficiency and Renewable Energy, Director, GO-OMA Mary McCune, Nuclear Energy, Director, Office of Facilities Management Peter O'Konski, Office of Management, Director, Office of Administration Jessica Schwersenska, Naval Reactors Laboratory Field Office, Analyst

127

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

February 6, 2012 February 6, 2012 CX-007997: Categorical Exclusion Determination Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration February 2, 2012 CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration February 2, 2012 CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration

128

April 24 Webinar to Explore How Power Marketing Administrations...  

Broader source: Energy.gov (indexed) [DOE]

April 24 Webinar to Explore How Power Marketing Administrations Work with Tribes April 24 Webinar to Explore How Power Marketing Administrations Work with Tribes April 18, 2013 -...

129

Memorandum from Secretary Chu on the Power Marketing Administrations...  

Broader source: Energy.gov (indexed) [DOE]

Memorandum from Secretary Chu on the Power Marketing Administrations' Role - March 16, 2012 Memorandum from Secretary Chu on the Power Marketing Administrations' Role - March 16,...

130

2011 Annual Planning Summary for Bonneville Power Administration...  

Office of Environmental Management (EM)

1 Annual Planning Summary for Bonneville Power Administration (BPA) 2011 Annual Planning Summary for Bonneville Power Administration (BPA) Annual Planning Summaries briefly...

131

Power Subscription Strategy: Administrator`s Record of Decision.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to adopt a Power Subscription Strategy for entering into new power sales contracts with its Pacific Northwest customers. The Strategy equitably distributes the electric power generated by the Federal Columbia River Power System (FCRPS) within the framework of existing law. The Power Subscription Strategy addresses the availability of power; describes power products; lays out strategies for pricing, including risk management; and discusses contract elements. In proceeding with this Subscription Strategy, BPA is guided by and committed to the Fish and Wildlife funding Principles for the BPA announced by the Vice President of the US in September 1998. This Record of Decision (ROD) addresses the issues raised by commenters who responded to BPA`s Power Subscription Strategy Proposal during and after the comment period that began with the release of the Proposal on September 18, 1998. The ROD is organized in approximately the same way as the Proposal and the Power Subscription Strategy that BPA developed based on the comments received. Abbreviations of party names used in citations appear in the section just preceding this introduction; a list of all the commenters follows the text of the ROD.

United States. Bonneville Power Administration

1998-12-01T23:59:59.000Z

132

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

associated with electric power generation in the Pacific Northwest. We would appreciate continued focus to provide dependable capacity, and that those resources currently appear most likely to be gas-fired. #12Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208

133

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

June 12, 2012 June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008697: Categorical Exclusion Determination Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 5, 2012 CX-008702: Categorical Exclusion Determination Forest Grove-McMinnville #1 Wood Pole Replacement Projects

134

SOUTHWESTERN POWER ADMINISTRATION ANNUAL REPORT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 S o u t h w e S t e r n p o w e r a d m i n i S t r at i o n pa g e 1 2012 a n n u a l r e p o r t Table of conTenTs Letter to the Secretary ------------------------------------------------------------------------------------- 3 Southwestern System Map ------------------------------------------------------------------------------- 4 About Southwestern --------------------------------------------------------------------------------------- 5 Supplementary Information ------------------------------------------------------------------------------ 6 Southwestern Federal Power System Energy Production ------------------------------- 6 Source and Distribution of Energy ------------------------------------------------------------

135

SOUTHWESTERN POWER ADMINISTRATION ANNUAL REPORT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 THIS PAGE INTENTIONALLY LEFT BLANK. S O U T H W E S T E R N P O W E R A D M I N I S T R AT I O N PA G E 1 2011 A N N U A L R E P O R T TABLE OF CONTENTS Letter to the Secretary ------------------------------------------------------------------------------------- 3 Southwestern System Map ------------------------------------------------------------------------------- 4 About Southwestern --------------------------------------------------------------------------------------- 5 Supplementary Information ------------------------------------------------------------------------------ 6 Southwestern Federal Power System Energy Production -------------------------------

136

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

September 15, 2010 September 15, 2010 CX-004876: Categorical Exclusion Determination Casa Grande-Empire (Double Circuit Upgrade) CX(s) Applied: B4.13 Date: 09/15/2010 Location(s): Pinal County, Arizona Office(s): Bonneville Power Administration September 15, 2010 CX-003906: Categorical Exclusion Determination Fiscal Year 2010 Willamette Basin Mitigation CX(s) Applied: B1.25 Date: 09/15/2010 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration September 10, 2010 CX-003791: Categorical Exclusion Determination Grant Access for Filling Potholes and for Paving Existing Roadway CX(s) Applied: B1.3 Date: 09/10/2010 Location(s): Clallam County, Washington Office(s): Bonneville Power Administration September 8, 2010 CX-003908: Categorical Exclusion Determination Fiscal Year 2010 Columbia Basin Fish Accords with Colville Confederated

137

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

December 27, 2012 December 27, 2012 CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 27, 2012 CX-009700: Categorical Exclusion Determination Finely Creek and North Valley Creek Property Funding CX(s) Applied: B1.25 Date: 12/27/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration December 21, 2012 CX-009702: Categorical Exclusion Determination Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 19, 2012 CX-009703: Categorical Exclusion Determination Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the

138

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

April 9, 2013 April 9, 2013 CX-010153: Categorical Exclusion Determination Chinook Property Funding - Update CX(s) Applied: B1.25 Date: 04/09/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 5, 2013 CX-010154: Categorical Exclusion Determination Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010155: Categorical Exclusion Determination Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 1, 2013 CX-010156: Categorical Exclusion Determination Chinook Property Funding CX(s) Applied: B1.25

139

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

June 8, 2010 June 8, 2010 CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration June 8, 2010 CX-002771: Categorical Exclusion Determination Marion and Sand Springs Substations Radio Tower Projects CX(s) Applied: B1.19 Date: 06/08/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration June 4, 2010 CX-002773: Categorical Exclusion Determination Idaho Department of Fish and Game Purchase of Crystal Springs Trout Farm - Snake River Sockeye Captive Propagation Program CX(s) Applied: A7 Date: 06/04/2010 Location(s): Springfield, Idaho Office(s): Bonneville Power Administration June 3, 2010

140

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

November 2, 2009 November 2, 2009 CX-000008: Categorical Exclusion Determination Raver-Paul #1 Access Road Improvement and Bridge Replacement CX(s) Applied: B1.3 Date: 11/02/2009 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration October 27, 2009 CX-000007: Categorical Exclusion Determination Spirit Tap to Colville-Boundary #1 Landings and Access Roads Construction CX(s) Applied: B1.3, B1.13 Date: 10/27/2009 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration October 8, 2009 CX-000004: Categorical Exclusion Determination Lane-Wendson #1 Structure 10/5 Access Road Improvement and Pole Replacement Project CX(s) Applied: B1.3 Date: 10/08/2009 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration October 8, 2009

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

July 16, 2013 July 16, 2013 CX-010581: Categorical Exclusion Determination Little Shell Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 10, 2013 CX-010584: Categorical Exclusion Determination Kokanee Bend South Conservation Easement Funding CX(s) Applied: B1.25 Date: 07/10/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 3, 2013 CX-010587: Categorical Exclusion Determination Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013

142

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

January 5, 2011 January 5, 2011 CX-005015: Categorical Exclusion Determination Redland South and Oregon City Microwave Tower Wireless Communication Projects CX(s) Applied: B1.7, B1.19 Date: 01/05/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration December 22, 2010 CX-004850: Categorical Exclusion Determination Marion to Santiam Fiber Installation CX(s) Applied: B4.7 Date: 12/22/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration December 13, 2010 CX-004742: Categorical Exclusion Determination De Moss-Fossil 115-Kilovolt Line Upgrade CX(s) Applied: B4.6 Date: 12/13/2010 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration December 9, 2010 CX-004744: Categorical Exclusion Determination Provision of Funds to Confederated Salish and Kootenai Tribes (CSKT) for

143

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

August 5, 2011 August 5, 2011 CX-006482: Categorical Exclusion Determination Swan Valley - Palisades Communication Upgrade CX(s) Applied: B1.7, B4.6 Date: 08/05/2011 Location(s): Idaho Office(s): Bonneville Power Administration August 5, 2011 CX-006481: Categorical Exclusion Determination Funding Removal of Underground Storage Tank at Nelson Springs CX(s) Applied: B6.1 Date: 08/05/2011 Location(s): Richland, Washington Office(s): Bonneville Power Administration August 3, 2011 CX-006483: Categorical Exclusion Determination Balancing Authority Area Service Agreement with Lane Electric Cooperative, Inc. CX(s) Applied: B4.1 Date: 08/03/2011 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration July 26, 2011 CX-006293: Categorical Exclusion Determination Provision of Funds to the Confederated Salish and Kootenai Tribes for

144

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

March 16, 2010 March 16, 2010 CX-001179: Categorical Exclusion Determination Lancaster-Noxon Number 1 Mile 46-50 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/16/2010 Location(s): Bonner County, Idaho Office(s): Bonneville Power Administration March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-001181: Categorical Exclusion Determination Santiam Substation Renovation CX(s) Applied: B1.16 Date: 03/12/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration

145

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

September 19, 2012 September 19, 2012 CX-009203: Categorical Exclusion Determination Ross Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 19, 2012 CX-009200: Categorical Exclusion Determination Respond to the Town of Eatonville's Land Use Review Request (LURR) CX(s) Applied: B4.7 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 14, 2012 CX-009204: Categorical Exclusion Determination Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 14, 2012 CX-009202: Categorical Exclusion Determination Port Angeles Substation Equipment Additions

146

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

May 1, 2012 May 1, 2012 CX-008153: Categorical Exclusion Determination Maupin-Tygh Valley Number 1 Pole Replacement Project CX(s) Applied: B1.3 Date: 05/01/2012 Location(s): Oregon Offices(s): Bonneville Power Administration May 1, 2012 CX-008152: Categorical Exclusion Determination Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05/01/2012 Location(s): Montana Offices(s): Bonneville Power Administration April 30, 2012 CX-008154: Categorical Exclusion Determination In-Kind Wood Pole Replacements - Driscoll-Naselle Number 1 CX(s) Applied: B1.3 Date: 04/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration April 24, 2012 CX-008156: Categorical Exclusion Determination Amended Provision of Funds to the Idaho Department of Fish and Game (IDFG)

147

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

June 9, 2011 June 9, 2011 CX-006197: Categorical Exclusion Determination Omak Area 3G Radio Site Upgrades CX(s) Applied: B1.19 Date: 06/09/2011 Location(s): Okanogan, Washington Office(s): Bonneville Power Administration June 1, 2011 CX-005969: Categorical Exclusion Determination Provision of Funds to Montana Fish, Wildlife and Parks for Purchase of the Perry Creek Property CX(s) Applied: B1.25 Date: 06/01/2011 Location(s): Lake County, Montana Office(s): Bonneville Power Administration May 26, 2011 CX-005968: Categorical Exclusion Determination Holcomb Radio Station and Naselle Substation Communication Upgrade Project CX(s) Applied: B1.7 Date: 05/26/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration May 25, 2011 CX-005967: Categorical Exclusion Determination

148

Southwestern Power Administration One West Third Street  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy Department of Energy Southwestern Power Administration One West Third Street Tulsa, Oklahoma 74103-3502 December 2, 2008 ENVIRONMENTAL POLICY STATEMENT The Environmental Policy is the driver for implementing and improving Southwestern Power Administration's (Southwestern) Environmental Management System so that Southwestern can maintain and improve environmental performance. The policy reflects the commitment of top management to comply with applicable legal and other requirements, to prevent pollution and to continually improve. Southwestern's Environmental Policy forms the basis upon which its Environmental Objectives and Targets are established. Southwestern's senior management has committed in writing the following Environmental Policy:

149

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

to provide the Bonneville Power Administration's (BPA) decision for the fish and wildlife protection by the Council at its October and November meetings, and forwarded to BPA on November 20, 2006. BPA appreciates. In evaluating the Council's project recommendations and making BPA's implementation decision, BPA has endeavored

150

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Accord Funds Dear Mr. Schriever: BPA Power Administration (BPA) received the Idaho Department of Fish-607-00 to the Snake River Sockeye Captive Propagation project 2007-402- 00. BPA acknowledges the change in priorities the Biological Opinion. BPA supports of your request to place priority for use of these funds on the Snake River

151

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

1 Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 the ISRP and Council agree with us that the UCSRB has produced a very comprehensive and professional are insufficiently developed....The project history section needs to describe the status of the work completed

152

EIS-0102: Bonneville Power Administration's 1983 Wholesale Power Rate  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration prepared this EIS to evaluate the potential environmental impacts associated with an increase in wholesale power rates that would become effective on November 1, 1983, including the effects of rate hikes in that year and the cumulative effects of previous rate hikes.

153

Southwestern Power Administration One West Third Street  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

15 2012 15 2012 NOTICE OF ORDER CONFIRMING AND APPROVING ROBERT DOUGLAS WILLIS POWER RATE ON AN INTERIM BASIS You are hereby notified, in accordance with the terms and conditions of the Robert Douglas Willis Hydropower Project power sales contract No. DE-PM75-85SW00117, that the Deputy Secretary of Energy under DOE Delegation Order Nos. 00-037.00 and 00-001-00D, effective December 6, 2001, and January 22, 2010, respectively, has approved the Robert Douglas Willis Rate Schedule, RDW-12, on an interim basis for the period October 1, 2012, through September 30, 2016. This annual power rate of $1,072,332 ($89,361 per month) is applicable to sales of power and energy under the terms of the contract mentioned above between Southwestern Power Administration and the Sam Rayburn Municipal Power Agency.

154

Western Area Power Administration Electric Power Training Center  

Broader source: Energy.gov (indexed) [DOE]

Area Power Administration Area Power Administration Electric Power Training Center Tribal Webinar Series Background: The U.S. Department of Energy's (DOE) Office of Indian Energy Policy and Programs, the U.S. DOE Tribal Energy Program, and the Western Area Power Administration are conducting a series of webinars that promote tribal energy sufficiency and foster economic development and employment on tribal lands through the use of renewable energy and energy efficiency technologies. The webinars will 1. Discuss methods for Tribes to evaluate and develop their renewable energy resources, 2. Help them build the knowledge and skills essential for sustainable energy projects, 3. Outline a process of strategic energy planning for tribes interested in improving their energy

155

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Associated Electric Cooperative, Inc. Substation Improvements Associated Electric Cooperative, Inc. Substation Improvements Program or Field Office: Southwestern Power Administration Location{s) (City/County/State): Springfield, Missouri, Greene County Proposed Action Description: Associated Electric Cooperative, Inc. proposes to install new underground conduit and cable in Southwestern Power Administrations' Springfield, Missouri electrical substation. Categorical ExciusionCs) Al'l'lied: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions and modifications to electric power transmission facilities within a previously disturbed or developed facility . For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021.

156

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Associated Electric Cooperative, Inc. Substation Improvements Associated Electric Cooperative, Inc. Substation Improvements Program or Field Office: Southwestern Power Administration Location{s) (City/County/State): Springfield, Missouri, Greene County Proposed Action Description: Associated Electric Cooperative, Inc. proposes to install new underground conduit and cable in Southwestern Power Administrations' Springfield, Missouri electrical substation. Categorical ExciusionCs) Al'l'lied: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions and modifications to electric power transmission facilities within a previously disturbed or developed facility . For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021.

157

Southeastern Power Administration 2007 Annual Report  

SciTech Connect (OSTI)

Dear Secretary Chu: I am proud to submit Southeastern Power Administrations (Southeasterns) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeasterns programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nations power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeasterns cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nations water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

none,

2007-12-28T23:59:59.000Z

158

Environmental Assessment for power marketing policy for Southwestern Power Administration  

SciTech Connect (OSTI)

Southwestern Power Administration (Southwestern) needs to renew expiring power sales contracts with new term (10 year) sales contracts. The existing contracts have been in place for several years and many will expire over the next ten years. Southwestern completed an Environmental Assessment on the existing power allocation in June, 1979 (a copy of the EA is attached), and there are no proposed additions of any major new generation resources, service to discrete major new loads, or major changes in operating parameters, beyond those included in the existing power allocation. Impacts from a no action plan, proposed alternative, and market power for less than 10 years are described.

Not Available

1993-12-01T23:59:59.000Z

159

Bonneville Power Administration 1991 Annual Report.  

SciTech Connect (OSTI)

Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

160

Southeastern Power Administration 2008 Annual Report  

SciTech Connect (OSTI)

Dear Secretary Chu: I am pleased to submit Southeastern Power Administrations (Southeasterns) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agencys programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeasterns cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our regions water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeasterns employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

none,

2008-12-29T23:59:59.000Z

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Western Area Power Administration | Open Energy Information  

Open Energy Info (EERE)

Administration Administration Jump to: navigation, search Name Western Area Power Administration Place Colorado Utility Id 27000 Utility Location Yes Ownership F NERC Location WECC, MAPP NERC MRO Yes NERC SPP Yes NERC WECC Yes ISO CA Yes RTO SPP Yes ISO MISO Yes ISO Other Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Schedule R-8 Farm and Home Residential Average Rates Commercial: $0.0278/kWh

162

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Erosion Control Project along Transmission Line 3016, Structure 31 Erosion Control Project along Transmission Line 3016, Structure 31 Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Muskogee County, Oklahoma Proposed Action Description: Southwestern Power Administration (Southwestern) proposes to initiate a project to prevent water erosion around transmission line 3016, structure number 31 located in Muskogee County, Oklahoma. The structure foundation is being eroded by water runoff and streambed washout activities within an unnamed tributary of the Canadian River. Categorical Exclusion(s) Applied: 10 CFR 1021 , Appendix B to Subpart D, Part B 1.33- Stormwater runoff control. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

163

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

September 19, 2011 September 19, 2011 CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration September 16, 2011 CX-006820: Categorical Exclusion Determination Prosser Hatchery Storage Shed CX(s) Applied: B1.15 Date: 09/16/2011 Location(s): Prosser, Benton County, Washington Office(s): Bonneville Power Administration, Natural Gas Regulation September 16, 2011 CX-006819: Categorical Exclusion Determination Replace Aging Wood Poles on Trans Alta?s Centralia Tap to Chehalis-Covington No. 1 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/16/2011 Location(s): Lewis County, Washington

164

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Line Relocation Project for Farrell Cooper Mining Company Line Relocation Project for Farrell Cooper Mining Company Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Stigler, Haskell County, Oklahoma Proposed Action Description: Farrell Cooper Mining Company (FCMC) proposes to require the relocation of a portion of Southwestern Power Administration's transmission line number 3016 to accommodate FCMCs coal mining activity in the area. Categorical Exclusion(s) Applied: 10 CFR 1021 , Appendix B to Subpart D, Part B4.l3- Upgrading or rebuilding approximately 20 miles in length or less of existing electric powerlines, which may involve minor relocations of small segments of the powerlines. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

165

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Erosion Control Project along Transmission Line 3016, Structure 31 Erosion Control Project along Transmission Line 3016, Structure 31 Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Muskogee County, Oklahoma Proposed Action Description: Southwestern Power Administration (Southwestern) proposes to initiate a project to prevent water erosion around transmission line 3016, structure number 31 located in Muskogee County, Oklahoma. The structure foundation is being eroded by water runoff and streambed washout activities within an unnamed tributary of the Canadian River. Categorical Exclusion(s) Applied: 10 CFR 1021 , Appendix B to Subpart D, Part B 1.33- Stormwater runoff control. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

166

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Relocation Project for Farrell Cooper Mining Company Line Relocation Project for Farrell Cooper Mining Company Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Stigler, Haskell County, Oklahoma Proposed Action Description: Farrell Cooper Mining Company (FCMC) proposes to require the relocation of a portion of Southwestern Power Administration's transmission line number 3016 to accommodate FCMCs coal mining activity in the area. Categorical Exclusion(s) Applied: 10 CFR 1021 , Appendix B to Subpart D, Part B4.l3- Upgrading or rebuilding approximately 20 miles in length or less of existing electric powerlines, which may involve minor relocations of small segments of the powerlines. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

167

Bonneville Power Administration 1997 Annual Report.  

SciTech Connect (OSTI)

The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

168

Southeastern Power Administration 2012 Annual Report  

SciTech Connect (OSTI)

Dear Secretary Moniz: I am pleased to submit Southeastern Power Administrations (Southeastern) fiscal year (FY) 2012 Annual Report for your review. This report reflects our agencys programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012. This past year, Southeastern marketed approximately 5.4 billion kilowatt-hours of energy to 487 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled about $263 million. With the financial assistance and support of Southeasterns customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2012. Currently, there are more than 214 customers participating in funding infrastructure renewal efforts of powerplants feeding the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems. This funding, which totaled more than $71 million, provided much needed repairs and maintenance for aging projects in Southeasterns marketing area. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rainfall strained our natural and financial resources. Power purchases for FY 2012 in the Georgia-Alabama-South Carolina System totaled approximately $29 million. About $8 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeasterns customer contract requirements. Southeasterns goal is to maximize the benefits of our regions water resources. Competing uses of these resources will present another challenging year for Southeasterns employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast. Sincerely, Kenneth E. Legg Administrator

none,

2012-01-01T23:59:59.000Z

169

DOE Names Bill Drummond As New Bonneville Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Names Bill Drummond As New Bonneville Power Administration Names Bill Drummond As New Bonneville Power Administration Administrator DOE Names Bill Drummond As New Bonneville Power Administration Administrator January 16, 2013 - 7:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department has chosen Bill Drummond to be the new Administrator for the Bonneville Power Administration (BPA), one of the four Power Marketing Administrations (PMAs) the Department oversees. As BPA's Administrator, Drummond will be responsible for managing the non-profit federal agency, which markets carbon-free power from Columbia River hydroelectic dams and operates the surrounding power grid, distributing wind, nuclear and other energy to the Pacific Northwest and beyond. Drummond's leadership of BPA is part of a larger strategy for

170

Southwestern Power Administration One West Third Street  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equal Employment Opportunity Equal Employment Opportunity and Diversity Policy Statement The Equal Employment Opportunity and Diversity Program is a vital part of the overall success of the mission of the Southwestern Power Administration (Southwestern). Southwestern's strength is in its people, a group of outstanding and committed individuals who, working together, have made Southwestern a leader in the power industry. If Southwestern is to continue to thrive in the changing power industry, we must meet the professional aspirations of the employees and candidates for employment we seek to train and attract. Southwestern recognizes that full utilization of the talents and capabilities of a diverse workforce is critical to the achievement of its mission. To achieve this, we must continue to

171

2012 Annual Planning Summary for Western Area Power Administration  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Western Area Power Administration.

172

2014 Annual Planning Summary for the Western Area Power Administration  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Western Area Power Administration.

173

2011 Annual Planning Summary for Southeastern Power Administration (SEPA)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Southeastern Power Administration (SEPA).

174

2011 Annual Planning Summary for Southwestern Power Administration (SWPA)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Southwestern Power Administration (SWPA).

175

2014 Annual Planning Summary for the Bonneville Power Administration  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Bonneville Power Administration.

176

Southwestern Power Administration Annual Report 2011  

SciTech Connect (OSTI)

Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwesterns customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwesterns mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwesterns marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nations energy needs in the future. Sincerely, Christopher M. Turner Administrator

none,

2013-04-01T23:59:59.000Z

177

Southwestern Power Administration Annual Report 2010  

SciTech Connect (OSTI)

Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwesterns customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwesterns mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwesterns marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nations energy needs in the future. Sincerely, Christopher M. Turner Administrator

none,

2012-09-01T23:59:59.000Z

178

Southwestern Power Administration Annual Report 2012  

SciTech Connect (OSTI)

Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwesterns customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwesterns mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwesterns marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nations energy needs in the future. Sincerely, Christopher M. Turner Administrator

none,

2013-09-01T23:59:59.000Z

179

Southeastern Power Administration 2011 Annual Report  

SciTech Connect (OSTI)

Dear Secretary Chu: I am pleased to submit Southeastern Power Administrations (Southeastern) fiscal year (FY) 2011 Annual Report for your review. This report reflects our agencys programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2010, and ending September 31, 2011. This past year, Southeastern marketed approximately 6.2 billion kilowatt-hours of energy to 489 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled more than $264 million. With the financial assistance and support of Southeasterns customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2011. This funding, which totaled more than $45 million, provided much needed repairs and maintenance for aging projects in Southeasterns marketing area. Currently, there are more than 214 customers participating in the funding efforts in the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems of projects. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rain placed strains on our natural and financial resources. Power purchases for FY 2011 totaled approximately $38 million. About $9 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeasterns customer contract requirements. Southeasterns goal is to maximize the benefits of our regions water resources. Competing uses of these resources will present another challenging year for Southeasterns employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast.

none,

2011-12-31T23:59:59.000Z

180

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

1994/01_cover.html[6/27/2011 11:57:49 AM] 1994/01_cover.html[6/27/2011 11:57:49 AM] Final Environmental Impact Statement (DOE/eis-0194) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: Tenaska Washington II Generation Project State Involved: Washington Abstract: BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Western Area Power Administration, Desert Southwest Region  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration, Desert Southwest Region Liberty-Parker #2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description The scope of work includes digging a trenching and burying a 1.25-inch OPGW conduit. The conduit trench will be about 4 feet deep and 10 inches wide, with warning tape placed above the conduit in the trench. Once the conduit has been placed, the trench will be backfilled with the original surface material. About 5.3 linear miles of trenching will be required, mostly within the existing dirt access road associated with the LIB-PAD #2 transmission line. Four pullboxes will be installed along the route. The pullboxes measure 2 feet by 3 feet by 2 feet and will be installed at least 24 inches below grade. An

182

Western Area Power Administration, Desert Southwest Region  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 Western Area Power Administration, Desert Southwest Region Liberty-Parker #2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description The scope of work includes digging a trenching and burying a 1.25-inch OPGW conduit. The conduit trench will be about 4 feet deep and 10 inches wide, with warning tape placed above the conduit in the trench. Once the conduit has been placed, the trench will be backfilled with the original surface material. About 5.3 linear miles of trenching will be required, mostly within the existing dirt access road associated with the LIB-PAD #2 transmission line. Four pullboxes will be installed along the route. The pullboxes measure 2 feet by 3 feet by 2 feet and will be installed at least 24 inches below grade. An

183

of Western Area Power Administration's Cyber Security Program  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Western Area Power Administration's Cyber Security Program DOE/IG-0873 October 2012 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 October 22, 2012 MEMORANDUM FOR THE UNDER SECRETARY OF ENERGY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Western Area Power Administration's Cyber Security Program" INTRODUCTION AND OBJECTIVE The Department of Energy's Western Area Power Administration (Western) markets and delivers hydroelectric power and related services to 15 states within the central and western United States. As the largest U.S. Power Marketing Administration, millions of households and

184

Southwestern Power Administration Annual Report 2008  

SciTech Connect (OSTI)

Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwesterns safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

none,

2010-12-01T23:59:59.000Z

185

Alaska Gateway School District Adopts Combined Heat and Power  

Office of Energy Efficiency and Renewable Energy (EERE)

Tok School's use of a biomass combined heat and power system is helping the school to save on energy costs.

186

Southwestern Power Administration One West Third Street  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy Statement on Harassing Conduct Policy Statement on Harassing Conduct and Retaliation in the Workplace The purpose of this policy statement is to affirm the Southwestern Power Administration's (Southwestern) responsibility to maintain a workplace free from harassment and retaliation, and to ensure that all employees are aware of my personal commitment to this affirmation. Harassment is any unwelcome verbal, written, or physical conduct that either denigrates or shows hostility or aversion toward a person on the basis of sex, race, color, religion, age, national origin, disability (physical or mental), sexual orientation, status as a parent, or protected genetic information that: (1) has the purpose or effect of creating an intimidating, hostile, or offensive work environment; (2) has the purpose or effect of unreasonably interfering with an employee's

187

Southwestern Power Administration Annual Report 2007  

SciTech Connect (OSTI)

Renewable energy isnt just a catchphrase at Southwestern Power Administration (Southwestern). It describes the hydroelectric energy we market, and the energy that Southwesterns employees bring to work every day, constantly challenging themselves to become more eff ective and effi cient in providing aff ordable, environmentally clean power to the American people. As Southwesterns new Administrator, I have had the opportunity to view our operations from a fresh perspective, and Im proud to share with you how a focus on continual improvement has been evident in accomplishments throughout the agency during fi scal year (FY) 2007. When the North American Electric Reliability Corporation (NERC) implemented new reliability standards, we met applicable implementation dates and exceeded NERCs control performance standards throughout the year. When tasked with reducing the agencys carbon footprint, we found ways to achieve an 8.7% reduction in energy intensity from last year without impacting our operational capabilities. And when faced with record-breaking infl ows into the reservoir projects from which we market power, we capitalized on the opportunity to provide customers with signifi cant quantities of supplemental energy. Our supplemental sales this year not only saved customers over $122 million, but increased Southwesterns revenues -- a huge win-win for Southwesterns ratepayers and the Nations taxpayers alike. Southwestern is proud of its role in protecting National and economic security by contributing to the diverse supply of domestically produced energy, operating and maintaining a safe and reliable transmission system, and ensuring good stewardship of our Nations water resources and environment. In FY 2007, Southwestern continued to repay all power costs to the American taxpayers by marketing and delivering approximately 5.6 billion kilowatthours of hydropower at cost-based rates to customers in our six-state region. This energy was generated from the 24 Federal hydroelectric projects in our marketing region, producing annual revenues of $161 million. In this time of rising energy costs, the Nations need for renewable energy has never been greater. Hydropower and the people of Southwestern stand ready to help meet that need.

none,

2008-01-01T23:59:59.000Z

188

Western Area Power Administration. Combined power system financial statements  

SciTech Connect (OSTI)

This report presents the results of the independent certified public accountants` audit of the Western Area Power Administration`s combined power system statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Westerns internal control structure disclosed three new reportable conditions concerning the lack of: (1) a reconciliation of stores inventory from subsidiary ledgers to summary financial information, (2) communication of interest during construction and related adjustments to interest on Federal investment, and (3) a system to prevent and detect power billing errors. None of the conditions were considered to be material weaknesses. Western provided concurrence and corrective action plans. The auditors` report on Western`s compliance with laws and regulations also disclosed two new instances of noncompliance. Western failed to calculate nonreimbursable expenses in accordance with the Grand Canyon Protection Act and had an unexplained difference in gross Federal investment balances used to calculate interest on Federal investment. Western provided concurrence and corrective action plans for the instances.

NONE

1998-02-26T23:59:59.000Z

189

Western Area Power Administration (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

future. Western Area Power Administration Responsible Contacts Thomas Wheeler Director, Workforce Analysis & Planning Division E-mail thomas.wheeler@hq.doe.gov Phone (202)...

190

2013 Annual Planning Summary for the Western Area Power Administration  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the WesternArea Power Administration.

191

PV integration in the Bonneville Power Administration balancing authority area.  

E-Print Network [OSTI]

??In this study I investigate the accuracy and necessity of the Bonneville Power Administration (BPA) PV integration tariff, which was instituted in 2011. Note that, (more)

Schumaker, Adam

2012-01-01T23:59:59.000Z

192

2011 Annual Planning Summary for Western Area Power Administration (WAPA)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Western Area Power Administration (WAPA).

193

2013 Annual Planning Summary for the Southwestern Area Power Administration  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 for theSouthwestern Area Power Administration.

194

2013 Annual Planning Summary for the Bonneville Power Administration...  

Office of Environmental Management (EM)

Impact Statements for 2013 and 2014 within the Bonneville Power Administration. PMABPANEPA-APS-2013.pdf More Documents & Publications 2012 Annual Planning Summary for...

195

EIS-0030: Bonneville Power Administration's Proposed FY 1980 Program  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this EIS to evaluate the environmental impacts of the proposed fiscal year 1980 construction and maintenance program.

196

Impacts of Western Area Power Administration`s power marketing alternatives on air quality and noise  

SciTech Connect (OSTI)

The Western Area Power Administration, which is responsible for marketing electricity produced at the hydroelectric power-generating facilities operated by the Bureau of Reclamation on the Upper Colorado River, has proposed changes in the levels of its commitment (sales) of long-term firm capacity and energy to its customers. This report describes (1) the existing conditions of air resources (climate and meteorology, ambient air quality, and acoustic environment) of the region potentially affected by the proposed action and (2) the methodology used and the results of analyses conducted to assess the potential impacts on air resources of the proposed action and the commitment-level alternatives. Analyses were performed for the potential impacts of both commitment-level alternatives and supply options, which include combinations of electric power purchases and different operational scenarios of the hydroelectric power-generating facilities.

Chun, K.C.; Chang, Y.S.; Rabchuk, J.A.

1995-05-01T23:59:59.000Z

197

Management of Bonneville Power Administration's Information Technology Program, IG-0861  

Broader source: Energy.gov (indexed) [DOE]

Management of Bonneville Power Management of Bonneville Power Administration's Information Technology Program DOE/IG-0861 March 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 March 26, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Bonneville Power Administration's Information Technology Program" INTRODUCTION AND OBJECTIVE The Bonneville Power Administration provides about 30 percent of wholesale electric power to regional utilities that service homes, hospitals, financial institutions, commercial entities and military installations in the Pacific Northwest. Bonneville makes extensive use of various

198

Power Marketing Administrations Poised to Make Another Big Contribution to  

Broader source: Energy.gov (indexed) [DOE]

Marketing Administrations Poised to Make Another Big Marketing Administrations Poised to Make Another Big Contribution to America's Progress Power Marketing Administrations Poised to Make Another Big Contribution to America's Progress March 16, 2012 - 9:00am Addthis Lauren Azar Senior Advisor to Secretary Chu Most Americans have never heard of the Department of Energy's Power Marketing Administrations (PMAs), but these four organizations are a crucial part of the country's electricity infrastructure - past, present and future. Starting with the Bonneville Power Administration in 1937, Congress established the Power Marketing Administrations to distribute and sell electricity from a network of more than 130 federally built hydroelectric dams, including the Hoover Dam, the Columbia River dams, and others throughout the United States. While the PMAs -- which also include the

199

The Skycrane at the Bonneville Power Administration | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration August 2, 2010 - 10:44am Addthis Daniel B. Poneman Daniel B. Poneman Deputy Secretary of Energy What does this project do? The project is now on schedule and under budget. The Skycrane helped overcome challenging environmental conditions. It also made the work safer for workers on the ground. The project is expected to employ approximately 140 people at its peak. For a striking glimpse of a power grid rapidly evolving to handle renewable power, look to the Bonneville Power Administration in the Pacific Northwest. Crews just finished using a Skycrane helicopter to assemble 65 steel towers for a new high-voltage transmission line to move wind power throughout the region.

200

Bonneville Power Administration Stephen J. (Steve) Wright, Administrator  

E-Print Network [OSTI]

innovations associated with development of a Smart Grid, renewed focus on energy efficiency and progress is working with the region to integrate as much as 6,000 megawatts of wind energy into the regional grid of the region's greatest energy challenges ­ among them, developing power contracts that preserve the value

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

A History of the Southeastern Power Administration (1990 - 2010) |  

Broader source: Energy.gov (indexed) [DOE]

About Us » A History of the Southeastern Power Administration About Us » A History of the Southeastern Power Administration (1990 - 2010) A History of the Southeastern Power Administration (1990 - 2010) Southeastern Power Administration was established in 1950 by the Secretary of the Interior to carry out the functions assigned to the Secretary by the Flood Control Act of 1944. In 1977, Southeastern was transferred to the newly created United States Department of Energy. Southeastern, headquartered in Elberton, Georgia, is responsible for marketing electric power and energy generated at reservoirs operated by the United States Army Corps of Engineers. This power is marketed to more than 491 preference customers in the states of Georgia, Florida, Alabama, Mississippi, southern Illinois, Virginia, Tennessee, Kentucky, North Carolina, and South

202

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Northwest publicly owned electric utilities have helped 473 industrial companies save enough energy to power nearly 60,000 homes for a year. PR 02 15 BONNEVILLE POWER...

203

Inspection of surveillance activities and administrative leave policy at Bonneville Power Administration, Portland, Oregon  

SciTech Connect (OSTI)

The authors conducted an inspection of surveillance activities and administrative leave policy at the Bonneville Power Administration, Portland, Oregon. The purpose of their inspection was to determine if a covert video surveillance operation conducted at Bonneville Power Administration was consistent with Department of Energy policies and procedures and other applicable regulations and procedures, and to determine if administrative leave policies and procedures used at Bonneville Power Administration in a specific instance were consistent with Department of Energy requirements and the Code of Federal Regulations. This inspection focused on a specific incident that occurred in 1989 on the 5th floor of the BPA Headquarters Building located in Portland, Oregon. The incident involved the soiling of an employee`s personal property with what appeared to be urine.

Not Available

1994-04-01T23:59:59.000Z

204

BPA Integrated Program Review 1 Bonneville Power Administration  

E-Print Network [OSTI]

BPA Integrated Program Review 1 Bonneville Power Administration Summary of public comments to BPA Northwest Power & Conservation Council Meeting #12;BPA Integrated Program Review 2 Integrated Program Review Process Purpose of Integrated Program Review: · Present all BPA's costs (Power, Transmission and Agency

205

2012 Annual Planning Summary for Bonneville Power Administration...  

Office of Environmental Management (EM)

Impact Statements for 2012 and 2013 within Bonneville Power Administration. APS-2012-BPA.pdf APS-2012-BPA.xls More Documents & Publications 2013 Annual Planning Summary for the...

206

EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

207

Bonneville Power Administration Overview As of December 1, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bonneville Power Administration Overview As of December 1, 2014 Moody's: Aa1Stable S&P: AA-Stable Fitch: AAStable Grand Coulee Dam High Voltage Transmission Columbia Generating...

208

Southeastern Power Administration 2009 Annual Report | Department...  

Broader source: Energy.gov (indexed) [DOE]

year, Southeastern marketed approximately 6 billion kilowatt-hours of energy to 491 wholesale Federal power customers in 10 southeastern states. Revenues from the sale of this...

209

Southeastern Power Administration 2010 Annual Report | Department...  

Broader source: Energy.gov (indexed) [DOE]

year, Southeastern marketed approximately 8 billion kilowatt-hours of energy to 489 wholesale Federal power customers in 10 southeastern states. Revenues from the sale of this...

210

Electric Power Monthly - Energy Information Administration  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Electric Power Monthly Data for October 2014 | Release Date: December 23, 2014 | Next Release: January 26, 2015 | full report Previous Issues Issue: November 2014 October 2014...

211

EIS-0125: Bonneville Power Administration Intertie Development and Use  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this EIS to examine the environmental effects of expanding the capacity of the Pacific Northwest/Pacific Southwest Intertie, adoption of a long term Intertie Access Policy and enabling firm power marketing between California and the Northwest in order to make possible additional short-and long-term sales of the Federal power surplus. The Western Area Power Administration cooperated in the preparation of this EIS by virtue of its special expertise concerning the Third Alternating Current/California-Oregon Transmission Project.

212

Department of Energy Announces Start of Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Start of Western Area Power Start of Western Area Power Administration Recovery Act Project Department of Energy Announces Start of Western Area Power Administration Recovery Act Project September 16, 2009 - 12:00am Addthis WASHINGTON, DC - With the goal of bringing new jobs and green power to the West, Energy Secretary Steven Chu announced today a large-scale transmission project to be financed using funding from the American Recovery and Reinvestment Act. The Western Area Power Administration will use borrowing authority under the Recovery Act to help build the $213 million Montana-Alberta Tie Limited (MATL) transmission project between Great Falls, Montana, and Lethbridge, Alberta. Almost two-thirds of the 214-mile transmission line will be located on U.S. soil, creating American

213

Southeastern Power Administration 2012 Annual Report | Department...  

Broader source: Energy.gov (indexed) [DOE]

year, Southeastern marketed approximately 5.4 billion kilowatt-hours of energy to 487 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled...

214

Southeastern Power Administration 2007 Annual Report | Department...  

Broader source: Energy.gov (indexed) [DOE]

past year, Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in 11 southeastern states. Revenues from the sale of this...

215

Southeastern Power Administration 2013 Annual Report | Department...  

Broader source: Energy.gov (indexed) [DOE]

year, Southeastern marketed approximately 5.4 billion kilowatt-hours of energy to 486 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled...

216

Southeastern Power Administration 2008 Annual Report | Department...  

Broader source: Energy.gov (indexed) [DOE]

year, Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale Federal power customers in 10 southeastern states. Revenues from the sale of this...

217

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

energy, enough to power about half a million Northwest homes when the wind is blowing. BPA also will hold two "Meet the Builder" open- houses in late April. The new 38-mile,...

218

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CONTACT: Joel Scruggs, jlscruggs@bpa.gov, 503-230-5511 503-230-5131 Northwest public utilities, BPA top five-year energy savings target Public power, BPA have saved at least 560...

219

Bonneville Power Administration Yakima Fisheries Project; 13Sept1996  

Broader source: Energy.gov (indexed) [DOE]

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION YAKIMA FISHERIES PROJECT (YFP) RECORD OF DECISION Summary. As Administrator of the Bonneville Power Administration (BPA), I have decided to implement Alternative 2 of the proposed Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin in south- central Washington. The project responds directly to a need for knowledge of viable means to rebuild and maintain naturally spawning anadromous fish stocks in the Yakima Basin. Alternative 2 would experimentally supplement depressed populations of upper Yakima spring chinook salmon that spawn naturally, as well as undertake a study to determine the feasibility of re-establishing a naturally spawning population and significant fall fishery for coho salmon (now eliminated in the Basin).

220

BETWEEN UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

12-SLC-0663 12-SLC-0663 CONTRACT NO. 12-SLC-0663 BETWEEN UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION COLORADO RIVER STORAGE PROJECT MANAGEMENT CENTER AND SHELL ENERGY NORTH AMERICA FOR PURCHASE OF POWER Contract No. 12-SLC-0663 1 TABLE OF CONTENTS Section Title Page No. 1 Preamble ............................................................................................................... 2 2 Explanatory Recitals ............................................................................................ 2 3 Agreement ............................................................................................................. 3 4 Term of Contract .................................................................................................. 3

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EIS-0093: Bonneville Power Administration's 1982 Rate Proposal  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration prepared this statement to evaluate the potential environmental impacts associated with an increase in wholesale power rates for calendar year 1982, including the effects of rate hikes in that year, the cumulative effects of rate hikes from 1979-1985, as well as alternative revenue scenarios.

222

EIS-0031: Bonneville Power Administration 1979 Wholesale Rate Increase  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) developed this statement to explain the reasons for BPA's proposed power rate schedule, to conduct an analysis of the impacts which the proposal or alternatives thereto could have on both physical and socioeconomic characteristics of the human environment and to identify methods for mitigating the effects of the proposal.

223

EIS-0162: Bonneville Power Administration (BPA) Resource Programs  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Bonneville Power Administration (BPA) developed this programmatic environmental impact statement to support decisions to be made in several future efforts to identify the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers.

224

STATEMENT FOR THE RECORD BONNEVILLE POWER ADMINISTRATION BEFORE THE  

Broader source: Energy.gov (indexed) [DOE]

FOR THE RECORD FOR THE RECORD BONNEVILLE POWER ADMINISTRATION BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE JUNE 20, 2013 REGARDING RESOURCE ISSUES IN THE KLAMATH RIVER BASIN The U.S Department of the Interior's Bureau of Reclamation (Reclamation) has approached the Bonneville Power Administration (BPA) with a request to provide Federal power service to the Klamath Basin Irrigation Project's load. This request was made to the Administrator by letter received on August 27, 2009, requesting a contract(s) for the purchase and delivery of power to serve existing Reclamation load within the Klamath Project in Oregon. The letter noted the load was approximately 10 average megawatts and currently is served by PacifiCorp. The Klamath

225

Continuity of Operations at Bonneville Power Administration, IG-0781 |  

Broader source: Energy.gov (indexed) [DOE]

Continuity of Operations at Bonneville Power Administration, Continuity of Operations at Bonneville Power Administration, IG-0781 Continuity of Operations at Bonneville Power Administration, IG-0781 In the event of a major disruption to its nonnal operations, Bonneville must be prepared to continue its essential functions, particularly its power scheduling, tra~lsmission scheduling, and system operations. In this regard, Bonneville is required to follow Federal Preparedness Circular 65 (FPC 65), as prescribed by the Department of Homeland Security's Federal Emergency Management Agency. Under FPC 65, agencies are to develop viable contingency plans. The Circular also provides a number of key steps that agencies should take for continuity of operations. Specifically, it recommends that each agency: ( I ) prepare alternate operating facilities; (2)

226

Electric Power Monthly - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Electric Power Monthly Electric Power Monthly Data for October 2013 | Release Date: December 20, 2013 | Next Release: January 22, 2014 | full report Previous Issues Issue: November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 December 2012 November 2012 October 2012 September 2012 August 2012 July 2012 June 2012 May 2012 April 2012 March 2012 February 2012 January 2012(Nov) January 2012(Oct) December 2011 November 2011 October 2011 September 2011 August 2011 July 2011 June 2011 May 2011 April 2011 March 2011 February 2011 January 2011 issues prior to 2011 Format: pdf zip Go New Addition: Use EIA's new interactive Electricity Data Browser to find generation, fuel consumption, sales, revenue and average price time series,

227

Bonneville Power Administration Site Environmental Report, 1991.  

SciTech Connect (OSTI)

In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

United States. Bonneville Power Administration.

1992-06-01T23:59:59.000Z

228

Bonneville Power Administration 1991 site environmental report  

SciTech Connect (OSTI)

In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

Not Available

1992-06-01T23:59:59.000Z

229

Notices DEPARTMENT OF ENERGY Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

64 Federal Register 64 Federal Register / Vol. 78, No. 224 / Wednesday, November 20, 2013 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare a Supplemental Draft Environmental Impact Statement-Interconnection of the Proposed Wilton IV Wind Energy Center Project, North Dakota (DOE/ EIS-0469) AGENCY: Western Area Power Administration, DOE. ACTION: Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement and to Conduct a Scoping Meeting; Notice of Floodplain and Wetlands Involvement. SUMMARY: Western Area Power Administration (Western), an agency of the U.S. Department of Energy (DOE), intends to prepare a Supplemental Draft Environmental Impact Statement (SDEIS) for the interconnection of NextEra Energy Resources' proposed

230

2012 Annual Report [WESTERN AREA POWER ADMINISTRATION  

SciTech Connect (OSTI)

Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chus memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIPs flagship projectthe Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

none,

2012-01-01T23:59:59.000Z

231

Categorical Exclusion Determinations: Western Area Power Administration-Rocky Mountain Region  

Broader source: Energy.gov [DOE]

Categorical Exclusion Determinations issued by Western Area Power Administration-Rocky Mountain Region.

232

EIS-0005: Bonneville Power Administration FY 1979 Program  

Broader source: Energy.gov [DOE]

This final statement is one of a series prepared annually by BPA on each fiscal year's proposed construction and maintenance program. This statement covers the potential impact of the major new facilities and maintenance programs proposed for fiscal year 1979. It must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report"" (The ""Role EIS""), particularly Appendix B - BFA Power Transmission.

233

Inspection of Power Purchase Contracts at the Western Area Power Administration, IG-0372  

Broader source: Energy.gov (indexed) [DOE]

IG-1 IG-1 INFORMATION: Report on the "Inspection of Power Purchase Contracts at the Western Area Power Administration" TO:The Secretary BACKGROUND: The subject final report is provided for your information. The Office of Inspector General received an allegation regarding possible irregularities in certain power purchase contracts awarded by the Western Area Power Administration. Based on our survey of Western's power purchase procedures, we expanded our allegation based inquiry to include several management issues. Thus, the purpose of this inspection was to review the specific allegation as well as to evaluate Western's power purchase contracting procedures relating to competition, the documentation of the solicitation, negotiation, and award processes, and the

234

EIS-0095: Bonneville Power Administration's Expanded Residential Weatherization Program  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration prepared this statement to examine the environmental impacts of an expansion of the existing Residential Weatherization Program to include air-infiltration reducing (tightening) measures, such as storm windows and doors, insulation, weather-stripping and other improvements.

235

EIS-0077-S: Bonneville Power Administration Crow Butte Slough Crossing  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this SEIS to evaluate potential impacts resulting from construction of a 4,700 -foot segment of the Ashe-Slatt transmission line at Crow Butte Slough, overhead on towers on the existing right-of-way. This SEIS is a supplement to DOE/EIS-0077, Ashe-Slatt (Pebble Springs) 500-kilovolt Transmission Line.

236

EIS-0060: Bonneville Power Administration Proposed FY 1981 Program  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 78 existing substations.

237

ALASKA RECOVERY ACT SNAPSHOT | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

ALASKA RECOVERY ACT SNAPSHOT ALASKA RECOVERY ACT SNAPSHOT ALASKA RECOVERY ACT SNAPSHOT Alaska has substantial natural resources, including oil, gas, coal, solar, wind, geothermal, and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Alaska are supporting a broad range of clean energy projects, from energy efficiency and electric grid improvements to geothermal power. Through these investments, Alaska's businesses, universities, non-profits, and local governments are creating quality jobs today and positioning Alaska to play an important role in the new energy economy of the future. ALASKA RECOVERY ACT SNAPSHOT More Documents & Publications

238

Audit of the Western Area Power Administration's Contract with Basin Electric Power Cooperative, IG-0409  

Broader source: Energy.gov (indexed) [DOE]

June 25, 1997 June 25, 1997 MEMORANDUM FOR THE SECRETARY FROM: John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of the Western Area Power Administration's Contract with Basin Electric Power Cooperative" BACKGROUND: At the request of the Western Area Power Administration (Western), we conducted an audit of charges to Western made by Basin Electric Power Cooperative (Basin), under Contract No. DE- MP65-82WP-19001. The contract for Westernms purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. Western identified 17 areas where overcharges might have occurred. The

239

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Broader source: Energy.gov (indexed) [DOE]

2: 2: Appendices DOE/EIS-0312 April 2003 Appendix A Fish and Wildlife Funding Principles for Bonneville Power Administration Rates and Contracts Fish and Wildlife Implementation Plan EIS Appendix A: Fish and Wildlife Funding Principles Appendix A/ 1 Appendix A FISH AND WILDLIFE FUNDING PRINCIPLES FOR BONNEVILLE POWER ADMINISTRATION RATES AND CONTRACTS September 16, 1998 Preamble The purpose of these principles is to conclude the fish and wildlife funding process in which Bonneville has been engaged with various interests in the Region, and provide a set of guidelines for structuring Bonneville's subscription and power rate processes. The principles are intended to "keep the options open" for future fish and wildlife decisions that are anticipated to be made in late 1999 on reconfiguration of the hydrosystem and in

240

U.S. Department of Energy Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Idalia Substation Grounding and Drainage Improvements Idalia Substation Grounding and Drainage Improvements Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Idalia, Stoddard County, Missouri Proposed Action Description: Southwestern Power Administration proposes to perform necessary grounding and drainage improvements at the Idalia Substation facility. Categorical Exclusion(s) Applied: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions or modifications to electric power transmission facilities within a previously disturbed or developed facility area. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part I 021 . Regulatory Requirements in 10 CFR 1021.41 O(b ): (See full text in regulation)

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

U.S. Department of Energy Southwestern Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Idalia Substation Grounding and Drainage Improvements Idalia Substation Grounding and Drainage Improvements Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Idalia, Stoddard County, Missouri Proposed Action Description: Southwestern Power Administration proposes to perform necessary grounding and drainage improvements at the Idalia Substation facility. Categorical Exclusion(s) Applied: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions or modifications to electric power transmission facilities within a previously disturbed or developed facility area. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part I 021 . Regulatory Requirements in 10 CFR 1021.41 O(b ): (See full text in regulation)

242

Northwest Power and Conservation Council Fish and Wildlife Project Funding Recommendations to the Bonneville Power Administration  

E-Print Network [OSTI]

to the Bonneville Power Administration for Fiscal Years 2007 through 2009 October 2006 Programmatic Issues-based obligations into the broader Northwest Power Act program -- it is precisely the fact that Bonneville has to Bonneville that satisfy Bonneville's ESA-based objectives balanced with its broader Northwest Power Act

243

File:Federal Hydropower - Southwestern Power Administration.pdf | Open  

Open Energy Info (EERE)

Administration.pdf Administration.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Southwestern Power Administration.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 715 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:35, 22 May 2013 Thumbnail for version as of 15:35, 22 May 2013 1,275 × 1,650, 2 pages (715 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage

244

Alaska: Enhanced Efficiency of Wind-Diesel Power Generation in Tribal Villages  

Office of Energy Efficiency and Renewable Energy (EERE)

This project is benefiting tribal communities in Alaska with fuel savings, increased revenues to local utilities, reduced heating cost, as well as enabling utilities and customers to control costs.

245

U.S. Department of Energy Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Short Mountain Transmission Line Access Road Easement Acquisition Short Mountain Transmission Line Access Road Easement Acquisition Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Short Mountain, Leflore County, Oklahoma Proposed Action Description: Southwestern Power Administration proposes to obtain an easement to access a portion of transmission line located on Short Mountain in Leflore County, Oklahoma. Categorical Exclusion(s) Applied: l 0 CFR 102 l, Appendix B to Subpart D, Part B 1.24- Transfer, lease, disposition, or acquisition of interests in personal property or real property. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021

246

U.S. Department of Energy Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Line 3016 Access Road Acquisition Project Transmission Line 3016 Access Road Acquisition Project Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Porum, Muskogee County, Oklahoma Proposed Action Description: Southwestern Power Administration proposes to aquire an access road easement. This access road will enable vehicles and equipment to maintain and operate portion of transmission line 3016 near the structure 3 I area. Categorical Exclusion(s) Applied: 10 CFR l 021 , Appendix B to Subpart D, Part B 1.24- Transfer, lease, disposition, or acquisition of interests in personal property or real property. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part 1021

247

U.S. Department of Energy Southwestern Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Transmission Line 3016 Access Road Acquisition Project Transmission Line 3016 Access Road Acquisition Project Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Porum, Muskogee County, Oklahoma Proposed Action Description: Southwestern Power Administration proposes to aquire an access road easement. This access road will enable vehicles and equipment to maintain and operate portion of transmission line 3016 near the structure 3 I area. Categorical Exclusion(s) Applied: 10 CFR l 021 , Appendix B to Subpart D, Part B 1.24- Transfer, lease, disposition, or acquisition of interests in personal property or real property. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part 1021

248

U.S. Department of Energy Southwestern Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Short Mountain Transmission Line Access Road Easement Acquisition Short Mountain Transmission Line Access Road Easement Acquisition Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Short Mountain, Leflore County, Oklahoma Proposed Action Description: Southwestern Power Administration proposes to obtain an easement to access a portion of transmission line located on Short Mountain in Leflore County, Oklahoma. Categorical Exclusion(s) Applied: l 0 CFR 102 l, Appendix B to Subpart D, Part B 1.24- Transfer, lease, disposition, or acquisition of interests in personal property or real property. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021

249

U.S. Department of Energy Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

02 and 3002A Electrical Transmission Line Reconductoring Project 02 and 3002A Electrical Transmission Line Reconductoring Project Program or Field Office: Southwestern Power Administration Location(s) (Cit) /County/State): Butler, and Stoddard Counties, Missouri Proposed Action Description: Southwestern Power Administration proposes replace utility poles and transmission line conductor along portions of an existing transmission line to accommodate increased electrical loading and prevent electrical outages due to overloading of the electrical grid system with in the geographic region. Categorical Exclusion(s) Applied: 10 CFR I 021, Appendix B to Subpart D, Part 82.5- Safety and environmental improvements of a facility that do not result in a significant change in the expected useful life, design capacity, or

250

U.S. Department of Energy Southwestern Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Line 3010 Structure 38-44, 59 and 60 Transmission Structure Movement Project Line 3010 Structure 38-44, 59 and 60 Transmission Structure Movement Project Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Jonesboro, Arkansas, Craighead County Proposed Action Description: Southwestern Power Administration proposes to move several transmission line pole structures which are currently located on elevated gravel mounds and relocate several other structures. Categorical Exclusion(s) Applied: 10 CFR 1021, Appendix B to Subpart D, Part B2.5- Safety and environmental improvements of a facility that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed . For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

251

DOE Names Mark A. Gabriel as New Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Names Mark A. Gabriel as New Western Area Power Administration Names Mark A. Gabriel as New Western Area Power Administration Administrator DOE Names Mark A. Gabriel as New Western Area Power Administration Administrator April 3, 2013 - 2:53pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON, D.C. - The Energy Department has chosen Mark A. Gabriel to be the new Administrator of the Western Area Power Administration (WAPA) in Lakewood, Colorado, one of four Power Marketing Administrations (PMAs) the Department oversees. As WAPA's Administrator, Gabriel will be responsible for managing the non-profit federal agency, which delivers power from 57 power plants operated by the Bureau of Reclamation, the U.S. Army Corps of Engineers and the International and Water Commission to the western region of the United States. Gabriel has more than two decades of leadership

252

Hydrothermal Exploration at Pilgrim Hot Springs, Alaska | Department...  

Energy Savers [EERE]

Springs, Alaska Hydrothermal Exploration at Pilgrim Hot Springs, Alaska Lower Temperature Geothermal Resources are Yielding Power Thanks to Energy Department Investments Lower...

253

Western Area Power Administration (Arizona) | Open Energy Information  

Open Energy Info (EERE)

Arizona) Arizona) Jump to: navigation, search Name Western Area Power Administration Place Arizona Utility Id 27000 References EIA Form EIA-861 Final Data File for 2010 - File2_2010[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Energy and Capacity Components of Firm Electric Service Industrial Firm Transmission Service of Salt Lake City Area Integrated Projects Power Commercial Long-Term Firm Point-to-Point Transmission Service Commercial Nonfirm Transmission Service Commercial Short-Term Firm Point-to-Point Transmission Service Commercial Average Rates Commercial: $0.0175/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File2_2010"

254

Southwestern Power Administration Annual Report 2004-2006  

SciTech Connect (OSTI)

Confidence Commitment Cooperation These are words that spring to mind regarding Southwestern Power Administrations performance during fiscal years (FY) 2004-2006 By offering innovative, customer-oriented service, working to improve system reliability and efficiency, and partnering with customers and other Federal power stakeholders, Southwestern has certainly exhibited all three of these qualities during these challenging yet productive years In fact, our cooperative working relationships were critical to our success during the severe and widespread drought conditions which prevailed throughout Southwesterns marketing area for much of 2005-2006 When we proposed a temporary energy deferral program, our customers came on board by voluntarily taking less Federal hydropower than they were entitled to, enabling us to preserve system storage and fulfill our contract obligations during the crucial summer months of 2006 The U S Army Corps of Engineers (Corps) also helped improve our drought situation by allowing Southwestern more operational flexibility on a regional level Despite the challenges this critical drought period presented, Southwestern remained committed to fulfilling our mission and strategic goals From FY 2004 through FY 2006, we marketed and delivered all available Federal hydropower while meeting and even exceeding the reliability standards of the North American Electric Reliability Corporation (NERC) Our Power Operations Training Center in Springfield, Missouri, was cited as an Example of Excellence during a NERC readiness audit in October 2006; and as we have every year since NERC began measuring, Southwestern far exceeded the accepted NERC compliance ratings for power system operations reliability Our commitment to excellence and accountability has kept our repayment goals on target as well Revenues were sufficient to repay all annual expenses and the required principal investment in the Federal hydropower facilities Furthermore, the original investment in the Blakely Mountain Dam project in Arkansas was fully repaid at the end of FY 2006, just in time for the dams 50th birthday

none,

2006-01-01T23:59:59.000Z

255

Western Area Power Administration's Control and Administration of American Recovery and Reinvestment Act Borrowing Authority, OAS-RA-12-01  

Broader source: Energy.gov (indexed) [DOE]

Management Alert Management Alert Western Area Power Administration's Control and Administration of American Recovery and Reinvestment Act Borrowing Authority OAS-RA-12-01 November 2011 Department of Energy Washington, DC 20585 November 4, 2011 MEMORANDUM FOR THE ADMINISTRATOR, WESTERN AREA POWER ADMINISTRATION FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Management Alert on "The Western Area Power Administration's Control and Administration of American Recovery and Reinvestment Act Borrowing Authority" IMMEDIATE CONCERN Despite internal control and administration issues with its first project authorized under its $3.25 billion American Recovery and Reinvestment Act of 2009 (Recovery Act) borrowing authority, the Department of Energy's (Department) Western Area Power Administration

256

Regional economic impacts of changes in electricity rates resulting from Western Area Power Administration`s power marketing alternatives  

SciTech Connect (OSTI)

This technical memorandum describes an analysis of regional economic impacts resulting from changes in retail electricity rates due to six power marketing programs proposed by Western Area Power Administration (Western). Regional economic impacts of changes in rates are estimated in terms of five key regional economic variables: population, gross regional product, disposable income, employment, and household income. The REMI (Regional Impact Models, Inc.) and IMPLAN (Impact Analysis for Planning) models simulate economic impacts in nine subregions in the area in which Western power is sold for the years 1993, 2000, and 2008. Estimates show that impacts on aggregate economic activity in any of the subregions or years would be minimal for three reasons. First, the utilities that buy power from Western sell only a relatively small proportion of the total electricity sold in any of the subregions. Second, reliance of Western customers on Western power is fairly low in each subregion. Finally, electricity is not a significant input cost for any industry or for households in any subregion.

Allison, T.; Griffes, P.; Edwards, B.K.

1995-03-01T23:59:59.000Z

257

EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high- voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

258

April 24 Webinar to Explore How Power Marketing Administrations Work with  

Broader source: Energy.gov (indexed) [DOE]

April 24 Webinar to Explore How Power Marketing Administrations April 24 Webinar to Explore How Power Marketing Administrations Work with Tribes April 24 Webinar to Explore How Power Marketing Administrations Work with Tribes April 18, 2013 - 11:24am Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "How Power Marketing Administrations Market Power and Work with Tribes," on Wednesday, April 24, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. The fourth in a series of free tribal energy webinars focusing on transmission, this one will explore how power marketing administrations (PMAs) operate and how they work with Tribes. Presenters from WAPA and

259

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Broader source: Energy.gov (indexed) [DOE]

1: 1: Environmental Analyses DOE/EIS-0312 April 2003 Fish and Wildlife Implementation Plan Final Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Fish and Wildlife Implementation Plan States and Provinces Involved: Arizona, California, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, Wyoming, and British Columbia Abstract: Despite the efforts of BPA and other regional entities in the Pacific Northwest, some populations of fish and wildlife continue to decline. Reasons for the lack of success include the following: different groups have different values and priorities; there is no clear and agreed-upon scientific answer; and there are conflicting

260

Preliminary evaluation of wind energy potential: Cook Inlet area, Alaska  

SciTech Connect (OSTI)

This report summarizes work on a project performed under contract to the Alaska Power Administration (APA). The objective of this research was to make a preliminary assessment of the wind energy potential for interconnection with the Cook Inlet area electric power transmission and distribution systems, to identify the most likely candidate regions (25 to 100 square miles each) for energy potential, and to recommend a monitoring program sufficient to quantify the potential.

Hiester, T.R.

1980-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Microsoft Word - alaska.doc  

Gasoline and Diesel Fuel Update (EIA)

Alaska Alaska NERC Region(s) ....................................................................................................... -- Primary Energy Source........................................................................................... Gas Net Summer Capacity (megawatts) ....................................................................... 2,067 48 Electric Utilities ...................................................................................................... 1,889 39 Independent Power Producers & Combined Heat and Power ................................ 178 51 Net Generation (megawatthours) ........................................................................... 6,759,576 48 Electric Utilities ...................................................................................................... 6,205,050 40

262

Microsoft Word - alaska.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Alaska Alaska NERC Region(s) ....................................................................................................... -- Primary Energy Source........................................................................................... Gas Net Summer Capacity (megawatts) ....................................................................... 2,067 48 Electric Utilities ...................................................................................................... 1,889 39 Independent Power Producers & Combined Heat and Power ................................ 178 51 Net Generation (megawatthours) ........................................................................... 6,759,576 48 Electric Utilities ...................................................................................................... 6,205,050 40

263

AMCHITICA ISLAND, ALASKA  

Office of Legacy Management (LM)

Environment o Environment o f AMCHITICA ISLAND, ALASKA hlelvin L. hlerritt Sandia Laboratories Albuquerque, New Mexico Editors R. Glen Fuller Battelle Colu~nbus Laboratories Columbus, Ohio Prepared for Division of Military Application Energy Research and Development Administration Published by Technical Infor~nation Center Energy Research and Development Administration Library of Congress Cataloging in Pt~blication Data hlain entry under title: The Environment of Amchitka Island, Alaska "TlD-26712." Bibliography: p. Includrs indcx. 1. Eeology-Alarka-Amchirka Island. 2. Underground nuclear explorions-lAlaska-Amchitka Island. 3. Cannikin Projcct. I. hlerritt, hlelvin Leroy, 1921- 11. Fuiler, Rtxeben Glen, 1910- 111. United Stater. Energy Research and Development

264

Southwestern Power Administration Combined Financial Statements, 2006-2009  

SciTech Connect (OSTI)

We have audited the accompanying combined balance sheets of the Southwestern Federal Power System (SWFPS), as of September 30, 2009, 2008, 2007, and 2006, and the related combined statements of revenues and expenses, changes in capitalization, and cash flows for the years then ended. As described in note 1(a), the combined financial statement presentation includes the hydroelectric generation functions of another Federal agency (hereinafter referred to as the generating agency), for which Southwestern Power Administration (Southwestern) markets and transmits power. These combined financial statements are the responsibility of the management of Southwestern and the generating agency. Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the combined financial statements are free of material misstatement. An audit includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of Southwestern and the generating agencys internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the combined financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall combined financial statement presentation. We believe that our audits provide a reasonable basis for our opinion. In our opinion, the combined financial statements referred to above present fairly, in all material respects, the respective financial position of the Southwestern Federal Power System, as of September 30, 2009, 2008, 2007, and 2006, and the results of its operations and its cash flow for the years then ended, in conformity with U.S. generally accepted accounting principles. Our audits were conducted for the purpose of forming an opinion on the 2009, 2008, 2007, and 2006 SWFPSs combined financial statements taken as a whole. The supplementary information in the combining financial statements is presented for purposes of additional analysis and is not a required part of the basic combined financial statements. The supplementary information has been subjected to the auditing procedures applied in the audit of the basic combined financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic combined financial statements taken as a whole.

none,

2009-09-01T23:59:59.000Z

265

Environmental audit, Bonneville Power Administration, lower Columbia area  

SciTech Connect (OSTI)

This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

Not Available

1990-11-01T23:59:59.000Z

266

The Future of the Bonneville Power Administration: Aggressive Competitor or Bureaucratic Dinosaur?  

Science Journals Connector (OSTI)

Splitting the Bonneville Power Administration into fully separate generating and transmission entitities is the only step, short of privatization or regionalization, that would eliminate the conflict between compliance with the Federal Energy Regulatory Commissions open access requirements and the need to maximize Bonneville Power Administration revenues for taxpayers.

Randall W. Hardy

1999-01-01T23:59:59.000Z

267

Power Marketing Administrations Leading the Nation's Transition to a 21st  

Broader source: Energy.gov (indexed) [DOE]

Power Marketing Administrations Leading the Nation's Transition Power Marketing Administrations Leading the Nation's Transition to a 21st Century Electric Grid Power Marketing Administrations Leading the Nation's Transition to a 21st Century Electric Grid November 19, 2012 - 12:54pm Addthis The Joint Outreach Team, made up of experts from DOE and the Western Area Power Administration, is working to develop strategies to ensure the viability, sustainability, and resiliency of Western to continue to meet its core mission and respond to the energy challenges of the 21st century. The Joint Outreach Team, made up of experts from DOE and the Western Area Power Administration, is working to develop strategies to ensure the viability, sustainability, and resiliency of Western to continue to meet its core mission and respond to the energy challenges of the 21st century.

268

DEPARTMENT OF ENERGY Western Area Power Administration Provo River Project Rate Order No. WAPA-149  

Broader source: Energy.gov (indexed) [DOE]

DEPARTMENT OF ENERGY Western Area Power Administration Provo River Project Rate Order No. WAPA-149 AGENCY: Western Area Power Administration, DOE. ACTION: Notice of Rate Order Concerning a Power Rate Formula. SUMMARY: The Deputy Secretary of Energy confinned and approved Rate Order No. W AP A-149, placing a power rate fOlIDula for the Provo River Project (PRP) of Western Area Power Administration (Western) into effect on an interim basis. The provisional power rate formula will remain in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) COnfilIDs, approves, and places it into effect on a final basis, or until the power rate formula is replaced by another power rate fOlIDula. DATES: The provisional power rate fonnula will be placed into effect on an interim basis on

269

Alaska/Geothermal | Open Energy Information  

Open Energy Info (EERE)

Alaska/Geothermal Alaska/Geothermal < Alaska Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Alaska Geothermal General Regulatory Roadmap Geothermal Power Projects Under Development in Alaska Developer Location Estimated Capacity (MW) Development Phase Geothermal Area Geothermal Region Akutan Geothermal Project City Of Akutan Akutan, Alaska 10 MW10,000 kW 10,000,000 W 10,000,000,000 mW 0.01 GW 1.0e-5 TW Phase II - Resource Exploration and Confirmation Akutan Fumaroles Geothermal Area Alaska Geothermal Region Pilgrim Hot Springs Geothermal Project Unaatuq (Near Nome), OR 10 MW10,000 kW 10,000,000 W 10,000,000,000 mW 0.01 GW 1.0e-5 TW Phase I - Resource Procurement and Identification Pilgrim Hot Springs Geothermal Area Alaska Geothermal Region Add a geothermal project.

270

Comment on the future of the Bonneville Power Administration Jim G. Likes, Thurston County, WA  

E-Print Network [OSTI]

Comment on the future of the Bonneville Power Administration Jim G. Likes, Thurston County, WA Bonneville is a regional agency that markets federal hydropower and augments its power supply with market, everyday citizens, to pay illegally inflated power costs. Because of this, Bonneville should have the legal

271

Bonneville Power Administration and the Industrial Technologies Program Leverage Support to Overcome Energy Efficiency Barriers in the Northwest  

Broader source: Energy.gov [DOE]

This case study explores how Bonneville Power Administration, a Northwest regional wholesale power provider, rethought how to encourage and promote energy efficiency projects through its utilities.

272

THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation  

Broader source: Energy.gov [DOE]

Deputy Secretary of Energy Elizabeth Sherwood-Randall will visit the Western Area Power Administration for a ceremony at the Electrical District No. 5 Substation to view progress on the Electrical District 5-to-Palo Verde transmission project.

273

EIS-0066: The Role of Bonneville Power Administration in the Pacific Northwest Power Supply System- including its Participation in a Hydro-Thermal Power Program  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) prepared this EIS to examine the environmental impacts of the Pacific Northwest Power Planning and Conservation Act, which will foster regional electric power planning in the four Northwest states, as well as increase BPAs authority to address future power needs.

274

OPPORTUNITIES FOR STUDENT INTERNS/RECENT GRADUATES SOUTHWESTERN POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ELECTRIC POWER MARKETING ELECTRIC POWER MARKETING OFFICE OF CORPORATE OPERATIONS ELECTRICAL, MECHANICAL, OR INDUSTRIAL ENGINEER Apply at www.usajobs.gov About the Division of Electric Power Marketing: The Division of Electric Power Marketing negotiates, develops, and drafts contracts and technical documents to support Southwestern's mission of marketing and delivering Federal hydropower. The Division also oversees Southwestern's program to replace major electrical and mechanical equipment at U.S. Army Corps of Engineers (Corps) hydroelectric projects. Technical aspects and length of a project's lifecycle can vary by project, but the work generally involves strong project management skills in addition to technical knowledge. Skills Needed: * Basic computer applications (Microsoft Office - Word, Excel, Outlook, etc.)

275

Bonneville Power Administration South Oregon Coast Reinforcement Project  

Broader source: Energy.gov (indexed) [DOE]

1 1 Federal Register / Vol. 63, No. 61 / Tuesday, March 31, 1998 / Notices President of Utility Contracting, Citizens Power Sales, 160 Federal Street, Boston, Massachusetts 02110. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by the DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above. Issued in Washington, DC on March 24, 1998. Anthony J. Como, Manager, Electric Power Regulation, Office of Coal and Power Im/Ex, Office of Coal and Power Systems, Office of Fossil Energy.

276

Powering the Nuclear Navy | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Powering the Nuclear Navy Powering the Nuclear Navy Home > About Us > Our Programs > Powering the Nuclear Navy Powering the Nuclear Navy The Naval Nuclear Propulsion Program provides militarily effective nuclear propulsion plants and ensures their safe, reliable and long-lived operation. This mission requires the combination of fully trained U.S. Navy men and women with ships that excel in endurance, stealth, speed, and independence from supply chains. NNSA's Navy Reactors Program provides the design, development and operational support required to provide militarily effective nuclear propulsion plants and ensure their safe, reliable and long-lived operation. This budget requests more than $1 billion to power a modern nuclear Navy: Continuation of design and development work for the OHIO-class

277

OPPORTUNITIES FOR STUDENT INTERNS/RECENT GRADUATES SOUTHWESTERN POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RELIABILITY COMPLIANCE & TRANSMISSION POLICY RELIABILITY COMPLIANCE & TRANSMISSION POLICY OFFICE OF CORPORATE OPERATIONS ELECTRICAL, MECHANICAL, OR INDUSTRIAL ENGINEER Apply at www.usajobs.gov About the Division of Reliability Compliance and Transmission Policy: The Division of Reliability Compliance and Transmission Policy is the lead division in ensuring Southwestern is compliant with North American Electric Reliability Corporation (NERC) Reliability Standards and Federal Energy Regulatory Commission (FERC) open access transmission service policies in areas such as: * transmission system operation * balancing authority operations * hydropower operations * power system disturbance investigation * power system protective relaying * transmission system planning * power system maintenance functions

278

Power Marketing Administrations Poised to Make Another Big Contributio...  

Office of Environmental Management (EM)

Contribution to America's Progress March 16, 2012 - 9:00am Addthis Lauren Azar Senior Advisor to Secretary Chu Most Americans have never heard of the Department of Energy's Power...

279

Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Special Inquiry Report Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration DOE/IG-0895 October 2013 Department of Energy Washington, DC 20585 October 3, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Inquiry: "Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration" BACKGROUND The Department of Energy's Bonneville Power Administration (Bonneville) is a self-funding entity that covers its costs by marketing wholesale electrical power from 31 Federal hydro projects. It is responsible for operating and maintaining about three-fourths of the high-voltage transmission in the Pacific Northwest. Bonneville's 3,100 employees represent 20 percent of the

280

Western Area Power Administration Record of Decision for the Energy Planning and Management Program  

Broader source: Energy.gov (indexed) [DOE]

81 81 Federal Register / Vol. 60, No. 197 / Thursday, October 12, 1995 / Notices at 941 North Capitol Street, NE., Washington, DC 20426. Lois D. Cashell, Secretary. [FR Doc. 95-25230 Filed 10-11-95; 8:45 am] BILLING CODE 6717-01-M Western Area Power Administration Record of Decision for the Energy Planning and Management Program AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Department of Energy, Western Area Power Administration (Western) completed a draft and final environmental impact statement (EIS), DOE/EIS-0182, on its Energy Planning and Management Program (Program). Western is publishing this Record of Decision (ROD) to adopt the Program, which will require the preparation of integrated resource plans (IRP) by Western's long-term firm power

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

ALASKA ENERGY AUTHORITY Alaska Geothermal Development: A Plan...  

Open Energy Info (EERE)

ALASKA ENERGY AUTHORITY Alaska Geothermal Development: A Plan Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: ALASKA ENERGY AUTHORITY Alaska Geothermal...

282

Alaska's At-large congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

Alaska's At-large congressional district: Energy Resources Alaska's At-large congressional district: Energy Resources Jump to: navigation, search Equivalent URI DBpedia This article is a stub. You can help OpenEI by expanding it. This page represents a congressional district in Alaska. Registered Energy Companies in Alaska's At-large congressional district ABS Alaskan Inc Alaskan Wind Industries Four Dam Pool Power Agency FDPPA Kodiak Electric Association KEA Remote Power Inc. Sustina Energy Systems Wind Energy Alaska Energy Generation Facilities in Alaska's At-large congressional district Chena Hot Springs Geothermal Facility Utility Companies in Alaska's At-large congressional district Alaska Energy Authority Retrieved from "http://en.openei.org/w/index.php?title=Alaska%27s_At-large_congressional_district&oldid=174110"

283

Frozen Alaska  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Frozen Alaska Frozen Alaska Nature Bulletin No. 549-A January 11, 1975 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation FROZEN ALASKA Alaska, admitted to the Union in 1959 as our largest state, was purchased from Russia in 1867 for only $7,200,000. That huge peninsula has an area of 586,400 square miles -- more than twice the area of Texas and almost one-fifth of the whole United States. It is a treasure chest of vast wealth in gold, silver, copper, platinum and other important metals; of coal and petroleum; of fishes and furs; of forests, fertile soils and magnificent scenery. As our last frontier, it has become of vital strategic importance in our national defense. Alaska was a rare bargain, obtained largely through the insistent efforts of William H. Seward, secretary of state, but most of its great natural resources were unknown then. The American people, opposed to the purchase, scornfully called it "Seward's Folly," "Walrussia," "Polaria," and "a giant icebox ".

284

File:Federal Hydropower - Western Area Power Administration.pdf | Open  

Open Energy Info (EERE)

Western Area Power Administration.pdf Western Area Power Administration.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Western Area Power Administration.pdf Size of this preview: 466 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,305 × 1,680 pixels, file size: 715 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:42, 22 May 2013 Thumbnail for version as of 15:42, 22 May 2013 1,305 × 1,680, 2 pages (715 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file:

285

U.S. Energy Information Administration/Electric Power Monthly June 2012  

Gasoline and Diesel Fuel Update (EIA)

Electric Power Monthly June 2012 Electric Power Monthly June 2012 150 Appendix C Technical Notes The Energy Information Administration (EIA) periodically reviews and revises how it collects, estimates, and reports data pertaining to the electric power industry. These Technical Notes describe current data quality efforts and measures as well as each active survey form contributing to the data published in the Electric Power Monthly (EPM). Data Quality The EPM is prepared by the Electric Power Division, Office of Electricity, Renewables & Uranium Statistics (ERUS), Energy Information Administration (EIA), U.S. Department of Energy. Quality statistics begin with the collection of the correct data. To assure this, ERUS performs routine reviews of the data collected and the

286

Report on Audit of Bonneville Power Administration's Energy Resource Programs, IG-0379  

Broader source: Energy.gov (indexed) [DOE]

1995 1995 IG-1 INFORMATION: Report on "Audit of Bonneville Power Administration's Energy Resource Programs" The Secretary BACKGROUND: Bonneville Power Administration (Bonneville) was established to market and transmit hydroelectric power produced at the Bonneville Dam. Since then, Bonneville has acquired additional resources and, today, markets the power from 30 Federal dams and 1 non-federal nuclear plant in the Pacific Northwest. In April 1994, Bonneville entered into a 20-year contract to purchase the electrical output from a natural gas fired combustion turbine facility at a total cost of about $2.2 billion. Bonneville's resource acquisitions were to be made only after its planning process showed that demand for its electricity would exceed its available resources. In

287

Alaska Native Village Energy Development Workshop  

Broader source: Energy.gov (indexed) [DOE]

Alaska Native Village Energy Development Workshop Alaska Native Village Energy Development Workshop October 21-23, 2013 Presented by: U.S. Department of Energy Office of Indian Energy Policy and Programs and Office of Energy Efficiency and Renewable Energy Tribal Energy Program Co-sponsored by: University of Alaska-Fairbanks and Alaska Center for Energy and Power This workshop is designed to help Alaska Native villages and corporations understand the range of energy efficiency and renewable energy opportunities that exist in their remote communities. Part of an overall effort to further support and encourage accelerated clean energy resource development in Alaska Native villages, the workshop will cover topics such as: * Strategic energy planning * Clean energy project development and financing

288

Alaska Recovery Act State Memo | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Recovery Act State Memo Alaska Recovery Act State Memo Alaska Recovery Act State Memo Alaska has substantial natural resources, including oil, gas, coal, solar, wind, geothermal, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Alaska are supporting a broad range of clean energy projects, from energy efficiency and electric grid improvements to geothermal power. Through these investments, Alaska's businesses, universities, non-profits, and local governments are creating quality jobs today and positioning Alaska to play an important role in the new energy economy of the future. Alaska Recovery Act State Memo More Documents & Publications

289

Alaska Recovery Act State Memo | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Recovery Act State Memo Alaska Recovery Act State Memo Alaska Recovery Act State Memo Alaska has substantial natural resources, including oil, gas, coal, solar, wind, geothermal, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Alaska are supporting a broad range of clean energy projects, from energy efficiency and electric grid improvements to geothermal power. Through these investments, Alaska's businesses, universities, non-profits, and local governments are creating quality jobs today and positioning Alaska to play an important role in the new energy economy of the future. Alaska Recovery Act State Memo More Documents & Publications

290

Design and Operation of the 30 MJ Superconducting Magnetic Storage System on the Bonneville Power Administration Bus  

Science Journals Connector (OSTI)

A superconducting magnetic energy storage (SMES) unit is suitable for power system stablization because it can provide positive ... was installed at the Tacoma Substation of the Bonneville Power Administration as...

R. I. Schermer; M. H. Barron; H. J. Boenig

1984-01-01T23:59:59.000Z

291

Alaska START Round 3  

Broader source: Energy.gov [DOE]

The DOE Office of Indian Energy is accepting applications for the third round of the Alaska Strategic Technical Assistance Response Team (START) Program to assist Alaska Native corporations and federally recognized Alaska Native governments with accelerating clean energy projects.

292

2007 Wholesale Power Rate Adjustment Proceeding (WP-07) : Administrator's Final Record of Decision.  

SciTech Connect (OSTI)

This Record of Decision (ROD) contains the decisions of the Bonneville Power Administration (BPA), based on the record compiled in this rate proceeding, with respect to the adoption of power rates for the three-year rate period commencing October 1, 2006, through September 30, 2009. This ''2007 Wholesale Power Rate Adjustment Proceeding'' is designed to establish replacement rate schedules and General Rate Schedule Provisions (GRSPs) for those that expire on September 30, 2006. This power rate case also establishes the General Transfer Agreement (GTA) Delivery Charge for the period of October 1, 2007, through September 30, 2009. BPA's Power Subscription Strategy and Record of Decision (Subscription Strategy), as well as other Agency processes, provide much of the policy context for this rate case and are described in Section 2. This ROD follows a full evidentiary hearing and briefing, including an Oral Argument before the BPA Administrator. Sections 3 through 18, including any appendices or attachments, present the issues raised by parties in this proceeding, the parties positions, BPA staff positions on the issues, BPA's evaluations of the positions, and the Administrator's decisions. Parties had the opportunity to file briefs on exceptions to the Draft ROD, before issuance of this Final Record of Decision.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

293

Relationships between Western Area Power Administration`s power marketing program and hydropower operations at Salt Lake City area integrated projects  

SciTech Connect (OSTI)

This technical memorandum provides background information on the Western Area Power Administration (Western) and the physical characteristics of the Salt Lake City Area Integrated Projects (SLCA/IP) hydropower plants, which include the Colorado River Storage Project, the Rio Grande Project, and the Collbran Project. In addition, the history, electrical capacity, storage capacity, and flow restrictions at each dam are presented. An overview of Western`s current programs and services, including a review of statutory authorities, agency discretion, and obligations, is also provided. The variability of SLCA/IP hourly generation under various alternative marketing strategies and purchasing programs is discussed. The effects of Western`s services, such as area load control, outage assistance, and transmission, on SLCA/IP power plant operations are analyzed.

Veselka, T.D.; Folga, S.; Poch, L.A. [and others

1995-03-01T23:59:59.000Z

294

Categorical Exclusion Determinations: Alaska | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 2, 2011 June 2, 2011 CX-006033: Categorical Exclusion Determination Monitoring, Maintenance, Environmental and Biological Sampling, and Administrative Actions on Amchitka and Adak Islands, Aleutian Islands, Alaska CX(s) Applied: B1.3, B1.28, B3.1, B3.8 Date: 06/02/2011 Location(s): Amchitka, Alaska Office(s): Legacy Management June 1, 2011 CX-006009: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant Program - Alaska-Tribe Organized Village of Kake CX(s) Applied: A9, A11, B5.1 Date: 06/01/2011 Location(s): Kake, Alaska Office(s): Energy Efficiency and Renewable Energy May 24, 2011 CX-006008: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant Program - Alaska-Tribe-Interior Regional Housing Authority Circle Tribe

295

Task 3.14 - demonstration of technologies for remote power generation in Alaska. Semi-annual report, July 1, 1996--December 31, 1996  

SciTech Connect (OSTI)

This paper very briefly summarizes progress in the demonstration of a small (up to 6 MWe), environmentally acceptable electric generating system fueled by indigenous fuels and waste materials to serve power distribution systems typical of Alaskan Native communities. Two detailed appendices supplement the report. The project is focused on two primary technologies: (1) atmospheric fluidized bed combustion (AFBC), and (2) coalbed methane and coal-fired diesel technologies. Two sites have been selected as possible locations for an AFBC demonstration, and bid proposals are under review. The transfer of a coal-fired diesel clean coal demonstration project from Maryland to Fairbanks, Alaska was approved, and the environmental assessment has been initiated. Federal support for a fuel cell using coalbed methane is also being pursued. The appendices included in the report provide: (1) the status of the conceptual design study for a 600-kWe coal-fired cogeneration plant in McGrath, Alaska; and (2) a global market assessment of coalbed methane, fluidized-bed combustion, and coal-fired diesel technologies in remote applications.

Jones, M.L.

1998-12-31T23:59:59.000Z

296

Alaska BIA Providers Conference  

Broader source: Energy.gov [DOE]

The Alaska Bureau of Indian Affairs (BIA) is hosting the 24th Annual BIA Tribal Providers Conference in Anchorage, Alaska, Dec. 1-5, 2014.

297

ARM - Kiosks - Barrow, Alaska  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Barrow, Alaska Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global...

298

Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06  

Broader source: Energy.gov (indexed) [DOE]

AUDIT OF BONNEVILLE POWER ADMINISTRATION'S MANAGEMENT OF INFORMATION RESOURCES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/ig

299

Applying planning models to study new competition: Analysis for the Bonneville Power Administration  

Science Journals Connector (OSTI)

An integrated electric utility planning model, the Resource Policy Screening Model (RPSM), was used to project acquisitions from independent power producers made by customers of a US power marketing authority. Bonneville Power Administration (BPA) markets power from dams in the Pacific Northwest to retail utilities. BPA's historical cost advantage has eroded and customers are evaluating more costly nonutility generation to meet future load growth. If some customers will pay a premium above BPA rates for power, how much load could BPA lose? Steps in the analysis are presented. RPSM is a system dynamics model used in energy policy studies since 1983. This study marked the first application for understanding effects of electric industry deregulation on BPA. RPSM was modified, potential nonutility supplies were forecast, and scenario simulations of acquisitions, loads and rates were performed for utilities in the region. Later, the study method was adapted for other uses at BPA.

Franklin Neubauer; Erik Westman; Andrew Ford

1997-01-01T23:59:59.000Z

300

EIS-0182: Western Area Power Administration Energy Planning and Management Program  

Broader source: Energy.gov [DOE]

The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Impacts of Western Area Power Administration`s power marketing alternatives on utility demand-side management and conservation and renewable energy programs  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) requires all of its long-term firm power customers to implement programs that promote the conservation of electric energy or facilitate the use of renewable energy resources. Western has also proposed that all customers develop integrated resource plans that include cost-effective demand-side management programs. As part of the preparation of Western`s Electric Power Marketing Environmental Impact Statement, Argonne National Laboratory (ANL) developed estimates of the reductions in energy demand resulting from Western`s conservation and renewable energy activities in its Salt Lake City Area Office. ANL has also estimated the energy-demand reductions from cost-effective, demand-side management programs that could be included in the integrated resource plans of the customers served by Western`s Salt Lake City Area Office. The results of this study have been used to adjust the expected hourly demand for Western`s major systems in the Salt Lake City Area. The expected hourly demand served as the basis for capacity expansion plans develops with ANL`s Production and Capacity Expansion (PACE) model.

Cavallo, J.D.; Germer, M.F.; Tompkins, M.M.

1995-03-01T23:59:59.000Z

302

Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 (DOE/EIS-0183) (05/31/06)  

Broader source: Energy.gov (indexed) [DOE]

SUPPLEMENT TO ADMINISTRATOR'S RECORD OF DECISION ON SUPPLEMENT TO ADMINISTRATOR'S RECORD OF DECISION ON BONNEVILLE POWER ADMINISTRATION'S SERVICE TO DIRECT SERVICE INDUSTRIAL (DSI) CUSTOMERS FOR FISCAL YEARS 2007-2011 ADMINISTRATOR'S RECORD OF DECISION Bonneville Power Administration U.S. Department of Energy May 31, 2006 1 Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 I. Background On February 4, 2005, Bonneville Power Administration (BPA) sent a letter to customers and constituents describing a public process for comments on certain issues related to service by BPA to its remaining direct service industrial (DSI) customers that had not been finally decided in the Policy For Power Supply Role For Fiscal Years 2007-

303

Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory  

SciTech Connect (OSTI)

The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

Lee, A.D.; Conger, R.L.

1996-06-01T23:59:59.000Z

304

How may a customer exploit the Bonneville Power Administration's new pricing scheme?  

Science Journals Connector (OSTI)

For more than half a century, the Bonneville Power Administration (BPA) has marketed electricity produced by the Federal Columbia River Power System (FCRPS) to its 'preference' customers in the Pacific Northwest. It has historically met the growing needs of its preference customers by augmenting the power provided by the FCRPS with market purchases and recovering its costs through its cost-based rates. The BPA, however, is preparing to implement a new pricing scheme intended to balance its historical commitment to supply its customers with low-cost power from the FCRPS with the need to signal that growing demands are met with increasingly expensive generation resources. This paper describes an opportunity that may exist for customers to exploit the scheme to obtain a larger share of low-cost federal power going forward. We show that when all customers take advantage of the opportunity, they find themselves in a form of the prisoner's dilemma whose outcome is a lose-lose Nash equilibrium, and discuss its managerial implications.

Doug Allen; Ira Horowitz; Chi-Keung Woo

2011-01-01T23:59:59.000Z

305

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

306

Alaska Rural Energy Conference  

Broader source: Energy.gov [DOE]

The Alaska Rural Energy Conference is a three-day event offering a large variety of technical sessions covering new and ongoing energy projects in Alaska, as well as new technologies and needs for...

307

,"Alaska Proved Nonproducing Reserves"  

U.S. Energy Information Administration (EIA) Indexed Site

RL2R9911SAK1","RNGR9908SAK1","RNGR9909SAK1","RNGR9910SAK1" "Date","Alaska (with Total Offshore) Crude Oil Reserves in Nonproducing Reservoirs (Million Barrels)","Alaska (with...

308

START Program: Alaska  

Broader source: Energy.gov [DOE]

Overview fact sheet on the selected DOE Office of Indian Energy Strategic Technical Assistance Response Team (START) projects in Alaska.

309

Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 (DOE/EIS-0183) (06/19/06)  

Broader source: Energy.gov (indexed) [DOE]

266 Federal Register 266 Federal Register / Vol. 71, No. 117 / Monday, June 19, 2006 / Notices Education, Room 5C141, 400 Maryland Avenue, SW., Washington, DC 20202. [FR Doc. 06-5528 Filed 6-16-06; 8:45 am] BILLING CODE 4000-01-M DEPARTMENT OF ENERGY Bonneville Power Administration Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of final policy. SUMMARY: BPA Administrator Stephen J. Wright signed a supplement to the Administrator's Record of Decision (ROD) on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011. The original

310

Western Area Power Administration Draft Finding of No Significant Impact East Altamont Energy Center, Alameda County, California  

Broader source: Energy.gov (indexed) [DOE]

DOE/EA-1411 DEPARTMENT OF ENERGY Western Area Power Administration Draft Finding of No Significant Impact East Altamont Energy Center, Alameda County, California Summary: East Altamont Energy Center, LLC (EAEC LLC), a wholly owned subsidiary of Calpine Corporation applied to the Department of Energy (DOE), Western Area Power Administration (Western) to interconnect the East Altamont Energy Center (EAEC), a 1100-megawatt (MW) natural gas-fired power plant, to Western's Tracy Substation. EAEC LLC intends to serve competitive regional markets in California with power from the EAEC. Western proposes to make modifications at its Tracy Substation to accommodate the interconnection. The EAEC is a merchant plant which means that it would be independent of other generators and that the power generated would serve

311

Energy Incentive Programs, Alaska | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Alaska Energy Incentive Programs, Alaska October 29, 2013 - 11:29am Addthis Updated September 2013 What public-purpose-funded energy efficiency programs are available in my state? Alaska has no public-purpose-funded energy efficiency programs. What utility energy efficiency programs are available to me? Golden Valley Electric Association's Business $ense program , depleted its current funding as of June, 2013. The utility is evaluating the program and future program funding will be determined in late 2013. Interested parties are advised to check the website for updates. What load management/demand response options are available to me? Anchorage Municipal Light & Power has an interruptible rate available to customers with peak demands over 100 kW. In exchange for their willingness

312

Wind Resources in Alaska | OpenEI  

Open Energy Info (EERE)

Resources in Alaska Resources in Alaska Dataset Summary Description Wind resource data for Alaska and southeast Alaska, both high resolution wind resource maps and gridded wind parameters. The two high resolution wind maps are comprised of a grid of cells each containing a single value of average wind speed (m/s) at a hub height of 30, 50, 70, and 100 meters and wind power density (W/m^2) at a hub height of 50 meters for a 40,000 square meter area. The additional gridded wind parameter data includes data for points spaced 2 kilometers apart, and include: predicted wind speed frequency distribution as well as speed and energy in 16 directions (the information needed to produce a wind rose image at a given point). Data included here as .kml files (for viewing in Google Earth). GIS shape files available for the gridded wind parameters datasets from AEDI (http://akenergyinventory.org/data.shtml).

313

Administrative Technician  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Montana Maintenance, Fort Peck, Montana. Find out more...

314

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Broader source: Energy.gov (indexed) [DOE]

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

315

Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.  

SciTech Connect (OSTI)

For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

United States. Bonneville Power Administration. Office of Engineering.

1992-05-01T23:59:59.000Z

316

Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.  

SciTech Connect (OSTI)

For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

United States. Bonneville Power Administration. Office of Engineering.

1992-05-01T23:59:59.000Z

317

Alaska/Incentives | Open Energy Information  

Open Energy Info (EERE)

Alaska/Incentives Alaska/Incentives < Alaska Jump to: navigation, search Contents 1 Financial Incentive Programs for Alaska 2 Rules, Regulations and Policies for Alaska Download All Financial Incentives and Policies for Alaska CSV (rows 1 - 21) Financial Incentive Programs for Alaska Download Financial Incentives for Alaska CSV (rows 1 - 15) Incentive Incentive Type Active Alaska - Residential Energy-Efficient Appliance Rebate Program (Alaska) State Rebate Program No Association Loan Program (Alaska) State Loan Program Yes Energy Efficiency Interest Rate Reduction Program (Alaska) State Loan Program Yes Energy Efficiency Revolving Loan Fund Program (Alaska) State Loan Program Yes Golden Valley Electric Association - Commercial Lighting Retrofit Rebate Program (Alaska) Utility Rebate Program Yes

318

EXPORTS: Alaska LNG to Japan  

Science Journals Connector (OSTI)

EXPORTS: Alaska LNG to Japan ... Sometime within the coming few weeks the Polar Alaska and the Arctic Tokyo will begin their regular 3700- mile shuttle run between Alaska and Japan. ...

1969-08-11T23:59:59.000Z

319

Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan  

Broader source: Energy.gov (indexed) [DOE]

Moves Forward on Alaska Natural Gas Pipeline Loan Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program May 26, 2005 - 1:03pm Addthis WASHINGTON, DC - The Department of Energy tomorrow, Friday, May 27, will publish a Notice of Inquiry in the Federal Register seeking public comment on an $18 billion loan guarantee program to encourage the construction of a pipeline that will bring Alaskan natural gas to the continental United States. The pipeline will provide access to Alaska's 35 trillion cubic feet of proven natural gas reserves, and would be a major step forward in meeting America's growing energy needs and reducing our dependence on foreign sources of energy. It would also fulfill the Bush Administration's policy to bring Alaska's natural gas reserves to market.

320

Federal Agencies Collaborate to Expedite Construction of Alaska Natural Gas  

Broader source: Energy.gov (indexed) [DOE]

Federal Agencies Collaborate to Expedite Construction of Alaska Federal Agencies Collaborate to Expedite Construction of Alaska Natural Gas Pipeline Federal Agencies Collaborate to Expedite Construction of Alaska Natural Gas Pipeline June 29, 2006 - 2:44pm Addthis Agreement Establishes Framework for Increasing Energy Security WASHINGTON, DC - The U.S. Department of Energy and 14 other federal departments and agencies have signed an agreement to expedite the permitting and construction of the Alaska Natural Gas Pipeline which, when operational, will substantially increase domestic natural gas supply and advance the Administration's energy security policy. The agreement signals the U.S. government's commitment to expedite the federal permitting processes for the Alaska Natural Gas Pipeline and establishes a project management framework for cooperation among participating agencies to reduce

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan  

Broader source: Energy.gov (indexed) [DOE]

Moves Forward on Alaska Natural Gas Pipeline Loan Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program May 26, 2005 - 1:03pm Addthis WASHINGTON, DC - The Department of Energy tomorrow, Friday, May 27, will publish a Notice of Inquiry in the Federal Register seeking public comment on an $18 billion loan guarantee program to encourage the construction of a pipeline that will bring Alaskan natural gas to the continental United States. The pipeline will provide access to Alaska's 35 trillion cubic feet of proven natural gas reserves, and would be a major step forward in meeting America's growing energy needs and reducing our dependence on foreign sources of energy. It would also fulfill the Bush Administration's policy to bring Alaska's natural gas reserves to market.

322

Alaska Forum on the Environment  

Office of Energy Efficiency and Renewable Energy (EERE)

The Alaska Forum on the Environment (AFE) is Alaska's largest statewide gathering of environmental professionals from government agencies, non-profit and for-profit businesses, community leaders,...

323

EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental  

Broader source: Energy.gov [DOE]

This statement, one of a series prepared by the U.S. Department of Energys Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

324

Data Collection for the Bonneville Power Administration Project on Wind Loading of Transmission Conductors  

Science Journals Connector (OSTI)

ABSTRACT The Bonneville Power Administration (BPA) project, Wind Effects on Conductors for Span Factors was established to determine the relationship between actual and theoretical wind loads on overhead transmission conductors. This study aims to improve BPA transmission line design methods and criteria as they relate to wind conditions in the Pacific Northwest. For the past seven years, BPA has collected data from seven sites in the Pacific Northwest. Measurements of wind speeds and directions, ambient temperatures and barometric pressures, and conductor swing angles enable engineers to compare measured wind loads on conductors to theoretical values. Impact of such variables as height of conductor, span lengths and conductor diameter are also investigated. Three sites were instrumented with vertically arranged anemometers to measure wind speed as a function of height above ground. This paper covers site determination, instrumentation, data collection, and some site maintenance and operation challenges. The maintenance and manipulation of the very large data base that has been collected is discussed. As data analysis is not yet finished, final results are not included.

H.W. VOLPE

1987-01-01T23:59:59.000Z

325

Accident Investigation of the July 30, 2013, Electrical Fatality on the Bandon-Rogue No. 1 115kV Line at the Bonneville Power Administration  

Broader source: Energy.gov [DOE]

This report is an independent product of the Level I Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Level I Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting.

326

Accident Investigation of the September 20, 2012 Fatal Fall from the Dworshak-Taft #1 Transmission Tower, at the Bonneville Power Marketing Administration  

Broader source: Energy.gov [DOE]

This report is an independent product of the Level l Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Levell Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting

327

E-Print Network 3.0 - administration combined power Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Organizational Structure Summary: Review of the University of Regina's Administrative and Organizational Structure Preamble... that the University will "(i)ncrease our...

328

AMF Deployment, Oliktok, Alaska  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alaska Alaska Oliktok Deployment AMF Home Oliktok Home Deployment Operations Baseline Instruments and Data Plots at the Archive Outreach News & Press New Sites Fact Sheet (PDF, 1.6MB) Images Contacts Fred Helsel, AMF Operations Lynne Roeder, Media Contact Hans Verlinde, Principal Investigator AMF Deployment, Oliktok Point, Alaska This view shows the location of the Oliktok, Alaska, ARM Mobile Facility. Located at the North Slope of Alaska on the coast of the Arctic Ocean, Oliktok Point is extremely isolated, accessible only by plane. From this remote spot researchers now have access to important data about Arctic climate processes at the intersection of land and sea ice. As of October 2013, Oliktok Point is the temporary home of ARM's third and newest ARM Mobile Facility, or AMF3.

329

E-Print Network 3.0 - alaska seafood processing Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

seafood processing Search Powered by Explorit Topic List Advanced Search Sample search results for: alaska seafood processing Page: << < 1 2 3 4 5 > >> 1 Seafood Inspection Program...

330

Alaska ADEC Wetlands Regulation | Open Energy Information  

Open Energy Info (EERE)

Regulation Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska ADEC Wetlands Regulation Author Alaska Division of Water Published Alaska Department...

331

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

332

Indian/Alaska.pmd  

Broader source: Energy.gov (indexed) [DOE]

Indian Indian & Alaska Native Tribal Government Policy American Indian & Alaska Native Tribal Government Policy 1 U.S. DEPARTMENT OF ENERGY AMERICAN INDIAN & ALASKA NATIVE TRIBAL GOVERNMENT POLICY PURPOSE This Policy sets forth the principles to be followed by the Department of Energy (DOE) to ensure an effective implementation of a government to government relation- ship with American Indian and Alaska Native tribal governments. This Policy is based on the United States Constitution, treaties, Supreme Court decisions, Execu- tive Orders, statutes, existing federal policies, tribal laws, and the dynamic political relationship between Indian nations and the Federal government 1 . The most impor- tant doctrine derived from this relationship is the trust responsibility of the United States to protect tribal sover-

333

North Slope of Alaska  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govSitesNorth Slope of Alaska govSitesNorth Slope of Alaska NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts North Slope of Alaska Barrow: 71° 19' 23.73" N, 156° 36' 56.70" W Atqasuk: 70° 28' 19.11" N, 157° 24' 28.99" W The North Slope of Alaska (NSA) site is providing data about cloud and radiative processes at high latitudes. Centered at Barrow and extending to the south (to the vicinity of Atqasuk), west (to the vicinity of Wainwright), and east (towards Oliktok), the NSA site has become a focal point for atmospheric and ecological research activity on the North Slope. The principal instrumented facility was installed near Barrow in 1997,

334

Alaska | OpenEI  

Open Energy Info (EERE)

Alaska Alaska Dataset Summary Description The Southern Methodist University (SMU) Regional Geothermal Database of the U.S. consists of data from over 5000 wells in primarily high temperature geothermal areas from the Rockies to the Pacific Ocean; all wells within a geothermal area are located where available; the majority of the data are from company documents, well logs and publications. Many of the wells were not previously accessible to the public.Database includes: latitude/longitude, township/range, well depth, elevation, maximum temp, BHT, gradient(s), thermal conductivity, heat flow, Source SMU Date Released Unknown Date Updated Unknown Keywords Alaska geothermal hawaii SMU Data text/csv icon Alaska and Hawaii geothermal 2008 (csv, 20.9 KiB) Quality Metrics

335

Interconnection Guidelines (Alaska)  

Broader source: Energy.gov [DOE]

In October 2009, the Regulatory Commission of Alaska (RCA) approved net metering regulations. These rules were finalized and approved by the lieutenant governor in January 2010 and became effective...

336

Alaska Workshop: Workforce Development  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Office of Indian Energy is hosting two workshops at the Alaska Village Initiatives Rural Small Business Conference on Wednesday, February 12, 2014. Each workshop will...

337

Alaska Renewable Energy Fair  

Office of Energy Efficiency and Renewable Energy (EERE)

The 10th annual Alaska Renewable Energy Fair on the downtown parkstrip in Anchorage is fun for the whole family! Come down and enjoy the live music, crafts, great local food, informational booths,...

338

The 2004 North Slope of Alaska Arctic Winter Radiometric Experiment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2004 North Slope of Alaska 2004 North Slope of Alaska Arctic Winter Radiometric Experiment E. R. Westwater, M. A. Klein, and V. Leuski Cooperative Institute for Research in Environmental Sciences University of Colorado National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado A. J. Gasiewski, T. Uttal, and D. A. Hazen National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado D. Cimini Remote Sensing Division, CETEMPS Universita' dell'Aquila L'Aquila, Italy V. Mattioli Dipartimento di Ingegneria Elettronica e dell'Informazione Perugia, Italy B. L. Weber and S. Dowlatshahi Science Technology Corporation Boulder, Colorado J. A. Shaw Department of Electrical and Computer Engineering

339

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Purpose, Need and Issues Purpose, Need and Issues S-1 Summary In this summary: ΠPurpose, Need, and Issues ΠMethods and Their Impacts ΠPlanning Steps ΠProgram Alternatives and Their Impacts Purpose, Need and Issues Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 15,000 miles of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure S-1.) Those states offer a great diversity of vegetation (from trees to brush to grasses), which can interfere with electric power flow, pose safety problems for us and neighboring members of the public, or interfere with our ability to maintain our system. We need to keep vegetation a safe distance away from our electric power facilities and control

340

Alaska: Alaska's Clean Energy Resources and Economy (Brochure)  

SciTech Connect (OSTI)

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Alaska.

Not Available

2013-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0048-S: Bonneville Power Administration Proposed FY 1976 Program Facility Location, Okanogan Area Service, Douglas and Okanogan Counties, WA, Supplemental  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this facility location supplemental statement to address a proposal for transmission facilities to serve the Okanogan Valley, Washington. This statement is a supplement to Department of the Interior FES 75-79.

342

GRR/Section 14-AK-b - Alaska Pollutant Discharge Elimination System Permit  

Open Energy Info (EERE)

GRR/Section 14-AK-b - Alaska Pollutant Discharge Elimination System Permit GRR/Section 14-AK-b - Alaska Pollutant Discharge Elimination System Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-AK-b - Alaska Pollutant Discharge Elimination System Permit 14AKBAlaskaPollutantDischargeEliminationSystemPermit (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation United States Environmental Protection Agency Regulations & Policies Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 14AKBAlaskaPollutantDischargeEliminationSystemPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

343

Management and Administration | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management and Administration | National Nuclear Security Administration Management and Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Management and Administration Home > About Us > Our Programs > Powering the Nuclear Navy > Management and Administration Management and Administration NNSA's Naval Reactors is committed to excellence and dedicated to meeting

344

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

345

NASA [National Aeronautics and Space Administration] low power DIPS [Dynamic Isotope Power System] conceptual design study; Final report  

SciTech Connect (OSTI)

This report describes the conceptual design and integration of a low power (0.5 to 1.0 kWe) Dynamic Isotope Power System (DIPS) Low Power (LPD) with the Mariner Mark II (MMII) spacecraft for use on interplanetary and space exploration missions as an alternative to RTGs. A detailed MMII/LPD system description is provided that discusses, among other things, the design requirements, design point selection, system layout and spacecraft integration, mechanical design, electrical system design, interface assessments, reliability, and safety. Performance characteristics are given for the reference 500 We LPD using a peak cycle temperature of 1100 K. Parametrics are provided giving the LPD performance characteristics at power levels up to 1.0 kWe and peak cycle temperatures as high as 1300 K. A side-by-side comparison of the LPD performance with the RTG performance is provided. Finally, program plans, costs, and schedules are provided giving the overall plan for design, development, fabrication, qualification, and acceptance of the LPD system.

Otting, W.

1990-12-01T23:59:59.000Z

346

Tests with a line-commutated converter as a variable inductive load on the Bonneville Power Administration transmission system  

SciTech Connect (OSTI)

A twelve-pulse, line-commutated converter, with a steady-state rating of 2.5 kV and 5.5 kA, formerly used for charging and discharging a superconducting magnet, was reconfigured as a static reactive power load. Tests staged at the Tacoma, WA, substation of the Bonneville Power Administration (BPA) revealed that the converter could be used as a variable inductive load, provided a stable current controller was installed. The unit was modulated as a variable VAR load following a sinusoidal VAR demand signal with an amplitude up to 14.8 MVAR. The total losses at maximum VAR output were 370 kW. This paper explains the necessary modifications of the converter to operate as a variable reactive load. Measured current waveshapes are analyzed. The effects of such a load on the BPA transmission system are presented.

Boenig, H.J.; Hauer, J.F.; Nielsen, R.G.

1986-01-01T23:59:59.000Z

347

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

348

Alaska.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alaska Alaska www.effi cientwindows.org March 2013 1. Meet the Energy Code and Look for the ENERGY STAR ® Windows must comply with your local energy code. Windows that are ENERGY STAR qualifi ed typically meet or exceed energy code requirements. To verify if specific window energy properties comply with the local code requirements, go to Step 2. 2. Look for Effi cient Properties on the NFRC Label The National Fenestration Rating Council (NFRC) label is needed for verifi cation of energy code compliance (www.nfrc. org). The NFRC label displays whole- window energy properties and appears on all fenestration products which are part of the ENERGY STAR program.

349

ABC Allowable Biological Catch AFSC Alaska Fisheries Science Center  

E-Print Network [OSTI]

and Industrial Re- search Organization (Australia) DAS ­ Days At Sea EBM ­ Ecosystem-Based Management EBS GLOBEC ­ GLOBal ocean ECosystem dynamics GOA ­ Gulf of Alaska GOM ­ Gulf of Mexico HMS ­ Highly Migratory NMFS ­ National Marine Fisheries Service NOAA ­ National Oceanic and Atmospheric Administration NRC

350

EIS-0030-S: Bonneville Power Administration Proposed FY 1980 Program, Facility Location Supplement, Northwest Montana/North Idaho Support and Libby Integration, Supplemental  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this supplemental statement to evaluate the environmental impacts of proposed alternative actions to alternative actions intended to address the need for reliability of electrical service to loads in Northwest Montana and North Idaho and the need for integrating the generation being added at Libby Dam into the Federal Columbia River Power System.

351

Venetie, Alaska energy assessment.  

SciTech Connect (OSTI)

This report summarizes the Energy Assessment performed for Venetie, Alaska using the principals of an Energy Surety Microgrid (ESM) The report covers a brief overview of the principals of ESM, a site characterization of Venetie, a review of the consequence modeling, some preliminary recommendations, and a basic cost analysis.

Jensen, Richard Pearson; Baca, Micheal J.; Schenkman, Benjamin L.; Brainard, James Robert

2013-07-01T23:59:59.000Z

352

Alaska Native Villages  

Broader source: Energy.gov [DOE]

The DOE Office of Indian Energy Policy and Programs (DOE Office of Indian Energy), in partnership with the Denali Commission, provides Alaska Native villages with resources, technical assistance, skills, and analytical tools needed to develop sustainable energy strategies and implement viable solutions to community energy challenges

353

ALASKA SURVEYS AND INVESTIGATIONS  

Science Journals Connector (OSTI)

...with the Forest Service. The hot springs of Alaska are of impor-tance...A. Waring, who will visit the hot springs of Ketchikan and Sitka, in southeastern...one near Circle and the Baker and Chena hot springs, in the Tanana Valley; and one...

1915-05-14T23:59:59.000Z

354

Alaska Town Invests in Energy Efficiency | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Town Invests in Energy Efficiency Alaska Town Invests in Energy Efficiency Alaska Town Invests in Energy Efficiency July 13, 2010 - 8:56am Addthis Lorelei Laird Writer, Energy Empowers Small town Tanana, Alaska is off the grid. The city of about 300 people lies 132 mostly roadless miles from Fairbanks, making it easier to reach by airplane than by car. That means Tanana has to burn diesel to create electricity, pushing up the cost to 76 cents per kilowatt hour - at least 13 times the standard in the lower 48. These high costs make something as simple as powering streetlights very expensive. To save money and energy, Tanana applied for and received a $20,000 Energy Efficiency Conservation Block Grant from the U.S. Department of Energy. The money will allow Tanana to replace its older high-pressure sodium

355

Alaska Town Invests in Energy Efficiency | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Town Invests in Energy Efficiency Alaska Town Invests in Energy Efficiency Alaska Town Invests in Energy Efficiency July 13, 2010 - 8:56am Addthis Lorelei Laird Writer, Energy Empowers Small town Tanana, Alaska is off the grid. The city of about 300 people lies 132 mostly roadless miles from Fairbanks, making it easier to reach by airplane than by car. That means Tanana has to burn diesel to create electricity, pushing up the cost to 76 cents per kilowatt hour - at least 13 times the standard in the lower 48. These high costs make something as simple as powering streetlights very expensive. To save money and energy, Tanana applied for and received a $20,000 Energy Efficiency Conservation Block Grant from the U.S. Department of Energy. The money will allow Tanana to replace its older high-pressure sodium

356

Record of Decision for the Bonneville Power Administration's Service to Direct Service Industrial Customers for Fiscal Years 2007-2011  

SciTech Connect (OSTI)

Beginning in July 2004, the Bonneville Power Administration (BPA) initiated the Regional Dialogue process as part of its effort, in cooperation with its customers and constituents, to identify and decide issues regarding BPA's power supply role for FY 2007-2011. BPA service to Direct Service Industries (DSIs) has been steadily declining since the pre-1995 period when contracts totaled over 3,000 aMW, to 1995 when contracts were reduced to 2,000 average megawatts (aMW), to 2002 when contracts were reduced to 1,500 aMW (with much less actually delivered in the 2002-2006 period). Over the same period, BPA service to public utilities has grown significantly. Among the issues presented by BPA was whether it should continue the steady ramp-down of service to its DSI customers when existing power supply contracts with those customers expire on Sept. 30, 2006, or whether to eliminate further service. BPA proposed providing up to 500 aMW of service (cumulative) to creditworthy DSIs, at a known and capped cost, where such service would enable continued operation of DSI facilities, thereby maintaining Pacific Northwest jobs. BPA indicated that, in order to eliminate the market and default risks to BPA associated with a traditional ''take-or-pay'' physical power sales contract, and to meet the known and capped cost prerequisite for DSI service, its preferred alternative was to provide service benefits to the DSIs financially, by cashing-out, or monetizing, the value of a power sales contract in lieu of physically delivering power. BPA indicated also that it believed it was unlikely that service to the DSIs under the Industrial Firm Power (IP) rate schedule would provide a rate low enough to support economic operation by DSI customers that use BPA power to smelt aluminum. The aluminum smelters would make up over 95% of BPA's DSI load under a 500 aMW scenario. The proposal to provide 500 aMW of service benefits to the DSIs represented a continuation in the ramping-down of BPA's role as a supplier of power service to the DSIs.

N /A

2005-06-30T23:59:59.000Z

357

Pilgrim's Progress: An Update on Geothermal Potential in Alaska  

Office of Energy Efficiency and Renewable Energy (EERE)

A resource in central Alaska is showing promise for geothermal developmentthe renewable energy that draws on Earths natural heat for electricity and other uses. The myriad benefits of this clean, domestic power source make geothermal exploration an attractive proposition for this state, where off-grid demand means that Alaskans often use expensive, polluting diesel power.

358

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

359

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Broader source: Energy.gov (indexed) [DOE]

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

360

Office of Management and Budget: Skeptical View of Scientific Advice  

Science Journals Connector (OSTI)

...coordination and science strategy Federal Power Commission Interior Power marketing agencies: Alaska Power Administration Bonneville Power Administration Southeastern Power Administration Southwestern Power Administration Marine Mammal Commission National...

Barbara J. Culliton

1974-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Alaska START | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Resources » START Program » Alaska START Resources » START Program » Alaska START Alaska START Led by the DOE Office of Indian Energy, in partnership with the Denali Commission, the DOE Office of Energy Efficiency and Renewable Energy, and the National Renewable Energy Laboratory (NREL), the Strategic Technical Assistance Response Team (START) Initiative for Rural Alaska Native Community Energy Planning and Projects will support activities of Alaska Native communities and entities that are focused on community-based energy planning, energy awareness and training programs, and identification and implementation of renewable energy and energy efficiency opportunities. Through the START, each Alaska Native community will receive technical assistance focused on community-based energy planning, energy awareness and

362

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

363

OpenEI - Alaska  

Open Energy Info (EERE)

SMU: Alaska and Hawaii SMU: Alaska and Hawaii Geothermal Data http://en.openei.org/datasets/node/591 The Southern Methodist University (SMU) Regional Geothermal Database of the U.S. consists of data from over 5000 wells in primarily high temperature geothermal areas from the Rockies to the Pacific Ocean; all wells within
a geothermal area are located where available;  the majority of the data are from company documents, well logs and publications.  Many of the wells were not previously accessible to the public.Database includes: latitude/longitude, township/range, well depth, elevation, maximum temp, BHT, gradient(s), thermal conductivity, heat flow,

License

364

Alaska Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Geothermal Region Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Alaska Geothermal Region Details Areas (54) Power Plants (1) Projects (2) Techniques (0) Assessment of Moderate- and High-Temperature Geothermal Resources of the United States[1] Assessment of Moderate- and High-Temperature Geothermal Resources of the United States[2] References ↑ "Assessment of Moderate- and High-Temperature Geothermal Resources of the United States" ↑ "Assessment of Moderate- and High-Temperature Geothermal Resources of the United States" Geothermal Region Data State(s) Alaska Area 1,717,854 km²1,717,854,000,000 m² 663,091.644 mi² 18,490,808,670,600 ft² 2,054,553,384,000 yd² 424,490,312.67 acres USGS Resource Estimate for this Region Identified Mean Potential 677 MW677,000 kW

365

Alaska START | Department of Energy  

Office of Environmental Management (EM)

awareness and training programs, and identification and implementation of renewable energy and energy efficiency opportunities. Through the START, each Alaska Native community...

366

Applications for Alaska Strategic Technical Assistance Response...  

Office of Environmental Management (EM)

Applications for Alaska Strategic Technical Assistance Response Team Program Are Due Feb. 6 Applications for Alaska Strategic Technical Assistance Response Team Program Are Due...

367

Alaska Native Village Energy Development Workshop Agenda  

Broader source: Energy.gov [DOE]

Download a draft agenda for the Alaska Native Village Energy Development Workshop scheduled for October 21-23, 2013, in Fairbanks, Alaska.

368

START Alaska Historical Energy Usage Spreadsheet | Department...  

Broader source: Energy.gov (indexed) [DOE]

Alaska Historical Energy Usage Spreadsheet START Alaska Historical Energy Usage Spreadsheet Communities applying for the DOE Office of Indian Energy Strategic Technical Assistance...

369

Alaska Water Quality Standards | Open Energy Information  

Open Energy Info (EERE)

PermittingRegulatory Guidance - GuideHandbook: Alaska Water Quality StandardsPermittingRegulatory GuidanceGuideHandbook Author Alaska Department of Environmental Conservation...

370

Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

N /A

2000-06-23T23:59:59.000Z

371

Alternative Fuels Data Center: Alaska Information  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alaska Information to Alaska Information to someone by E-mail Share Alternative Fuels Data Center: Alaska Information on Facebook Tweet about Alternative Fuels Data Center: Alaska Information on Twitter Bookmark Alternative Fuels Data Center: Alaska Information on Google Bookmark Alternative Fuels Data Center: Alaska Information on Delicious Rank Alternative Fuels Data Center: Alaska Information on Digg Find More places to share Alternative Fuels Data Center: Alaska Information on AddThis.com... Alaska Information This state page compiles information related to alternative fuels and advanced vehicles in Alaska and includes new incentives and laws, alternative fueling station locations, truck stop electrification sites, fuel prices, and local points of contact. Select a new state Select a State Alabama Alaska Arizona Arkansas

372

EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental  

Broader source: Energy.gov [DOE]

This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

373

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah  

Broader source: Energy.gov [DOE]

This EIS is being prepared jointly by DOEs Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Westerns proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

374

Alaska Village Elec Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Village Elec Coop, Inc Village Elec Coop, Inc Jump to: navigation, search Name Alaska Village Elec Coop, Inc Place Alaska Utility Id 221 Utility Location Yes Ownership C NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Power- GS-2: Alakanuk Village Industrial Large Power- GS-2: Ambler Village Industrial Large Power- GS-2: Anvik Village Industrial Large Power- GS-2: Brevig Mission Village Industrial Large Power- GS-2: Chevak Village Industrial Large Power- GS-2: Eek Village Industrial

375

Alaska Renewable Energy Project | Open Energy Information  

Open Energy Info (EERE)

Renewable Energy Project Renewable Energy Project Jump to: navigation, search Logo: Renewable Energy Alaska Project Name Renewable Energy Alaska Project Agency/Company /Organization Executive Director Chris Rose Partner native, municipal, state, and federal coalition Sector Energy Focus Area Renewable Energy Topics Background analysis Website http://alaskarenewableenergy.o Country United States Northern America References Renewable Energy Alaska Project homepage[1] The Renewable Energy Alaska Project is a coalition of small and large Alaska utilities, businesses, consumer and conservation groups, Alaska native organizations, and municipal, state, and federal partners with an interest in developing Alaska's renewable energy resources.[2] REAP's mission is increase the development of renewable energy resources,

376

Alaska Harbors Geothermal Energy Potential | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Alaska Harbors Geothermal Energy Potential Alaska Harbors Geothermal Energy Potential January 10, 2014 - 12:00am Addthis Alaska Harbors Geothermal Energy Potential Leveraging...

377

E-Print Network 3.0 - alaska science center Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

science center Search Powered by Explorit Topic List Advanced Search Sample search results for: alaska science center Page: << < 1 2 3 4 5 > >> 1 UnitDepartment Name Title EMail...

378

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 FOIA Requests (October 1, 2009 - September 30, 2010) 0 FOIA Requests (October 1, 2009 - September 30, 2010) FOIA Request Number Date Received Estimated Completion Date Date Closed Documents Requested 2010-01 11/16/09 12/15/09 12/14/09 Performance standards & ratings for 10/1/08 through 9/30/09 for two employees. Partially granted. 2010-02 12/16/09 01/15/10 12/21/09 Employee's own performance evaluation package with written narrative. Granted. 2010-03 12/27/09 01/26/10 01/20/10 Employee's own performance evaluation package with written narrative. Previous request was not consecutively numbered. Granted. 2010-04 01/11/10 02/09/10 02/09/10 Notes, agreements of a team building/mediation held in April 2009. Partially granted. 2010-05 01/11/10 02/09/10 02/09/10 Statistical information re: FY2009 Performance ratings under 2.0 and additional information for employees over and under the age of 40, for 6100,6200 and 6300. No documents.

379

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Meeting 2 Meeting 2011 Meeting 2010 Meeting 2009 Meeting 2008 Meeting 2007 Meeting 2006 Meeting 2013 Hydropower Meeting The 2013 Regional Hydropower Council and Meeting were hosted by the Fort Worth District of the U.S. Army Corps of Engineers in Dallas, Texas. Click the links below to view materials from the council and meeting. The Tulsa District will host the 2014 Regional Hydropower Council and Meeting, tentatively scheduled for June 17-19, 2014, in Tulsa, Oklahoma. June 11-12, 2013, Council Skip Navigation Links 2013 Hydropower Council Agenda FY 2014 Proposed Project Packet FY 2015 Preliminary Project Packet Little Rock District MCCs and Switchgear Replacement Project June 12-13, 2013, Meeting Skip Navigation Links 2012 Hydropower Meeting Agenda Denison Powerhouse Major Rehabilitation

380

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Conference 1 Conference 2010 Conference 2009 Conference 2008 Conference 2007 Conference 2006 Conference 2012 Hydropower Conference The 2012 Regional Hydropower Council and Conference was hosted by the Vicksburg District of the U.S. Army Corps of Engineers in Hot Springs, Arkansas. Click the links below to view materials from the council and conference. The Fort Worth District will host the 2013 Regional Hydropower Council and Conference, tentatively scheduled for June 11-13, 2013, in Dallas, Texas. June 12-13, 2012, Council Skip Navigation Links 2012 Hydropower Council Agenda FY 2013 Proposed Project Packet FY 2014 Preliminary Project Packet June 13-14, 2012, Conference Skip Navigation Links 2012 Hydropower Conference Agenda Cost Estimating for Hydro Project Planning Entergy Hydro Operations (Lake Catherine & Lake Hamilton)

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Conference 8 Conference 2006 Conference 2007 Hydropower Conference The 2007 Regional Hydropower Council and Conference was hosted by the Vicksburg District of the U.S. Army Corps of Engineers in Vicksburg, Mississippi. Click the links below to view materials from the council and conference. June 12, 2007, Council Skip Navigation Links Bull Shoals Switchyard Feeder Repair Hydropower Council Agenda Preliminary FY 2009 Projects Proposed FY 2008 Projects June 13, 2007, Conference Skip Navigation Links Corps Budget Process Hydraulic Steel Structures Hydropower Conference Agenda Hydropower Customer Drought Perspective Kansas City Projects Impacting Hydropower Little Rock Projects Impacting Hydropower NERC Reliability Standards and Mandatory Compliance NERC Requirements Matrix Ozark Major Rehabilitation

382

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environment Home Environment Home Annual Site Environmental Report Annual Environmental Management System Progress Report Competing Uses Brochure Environmental Policy Statement NEPA Categorical Exclusion Determinations Categorical exclusions are classes of departmental actions that the Department of Energy has, by regulation, determined do not individually or cumulatively have a significant effect on the environment and for which, therefore, neither an environmental impact statement nor an environmental assessment is required. In accordance with DOE's policy to further transparency and openness in DOE's implementation of NEPA, Southwestern will, effective November 2, 2009, post classes of departmental actions which Southwestern's NEPA Compliance Officer has determined are classified as categorical exclusions pursuant to the parameters set forth

383

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Conference 7 Conference 2006 Conference 2008 Hydropower Conference The 2008 Regional Hydropower Council and Conference was hosted by the Fort Worth District of the U.S. Army Corps of Engineers in Fort Worth, Texas. Click the links below to view materials from the council and conference. June 10, 2008, Council Skip Navigation Links 2008 Hydropower Council Agenda FY 2009 Proposed Project Packet FY 2010 Preliminary Project Packet June 11, 2008, Conference Skip Navigation Links 2008 Hydropower Conference Agenda Corps Hydropower Benchmarking Kansas City Project Impacting Federal Hydropower Little Rock Projects Impacting Federal Hydropower Ozark Major Rehab Powerhouse Fire Detection Robert D Willis Vegetation Drawdown Sub-agreement Status Supersaturated Dissolved Oxygen (SDOX(tm)) Delivery Technology at Norfork Dam

384

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Meeting 1 Meeting 2010 Meeting 2009 Meeting 2008 Meeting 2007 Meeting 2006 Meeting 2012 Hydropower Meeting The 2012 Regional Hydropower Council and Meeting were hosted by the Vicksburg District of the U.S. Army Corps of Engineers in Hot Springs, Arkansas. Click the links below to view materials from the council and meeting. The Fort Worth District will host the 2013 Regional Hydropower Council and Meeting, tentatively scheduled for June 11-13, 2013, in Dallas, Texas. June 12-13, 2012, Council Skip Navigation Links 2012 Hydropower Council Agenda FY 2013 Proposed Project Packet FY 2014 Preliminary Project Packet June 13-14, 2012, Meeting Skip Navigation Links 2012 Hydropower Meeting Agenda Cost Estimating for Hydro Project Planning Entergy Hydro Operations (Lake Catherine & Lake Hamilton)

385

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Conference 2 Conference 2010 Conference 2009 Conference 2008 Conference 2007 Conference 2006 Conference 2011 Hydropower Conference The 2011 Regional Hydropower Council and Conference was hosted by the Kansas City District of the U.S. Army Corps of Engineers in Kansas City, Missouri. Click the links below to view materials from the council and conference. The Vicksburg District will host the 2012 Regional Hydropower Council and Conference, tentatively scheduled for June 12-14, 2012, in Hot Springs, Arkansas. June 14-15, 2011, Council Skip Navigation Links 2011 Hydropower Council Agenda FY 2012 Proposed Project Packet FY 2013 Preliminary Project Packet June 15-16, 2011, Conference Skip Navigation Links 2011 Hydropower Conference Agenda Crane Rehabilitation Hydro Optimization in the Pacific Northwest

386

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Office of DOE Office of Economic Impact & Diversity DOE EEO Summary Statistics Equal Employment Opportunity & Diversity Policy Statement Prevention of Harassment & Retaliation Policy Statement U.S. EEOC Accessibility/Section 508 The U.S. Department of Energy and Southwestern are committed to providing access to our web pages for individuals with disabilities, both members of the public and Federal employees. In demonstrating our commitment, we strive to comply with the requirements of Section 508 of the Rehabilitation Act (29 U.S.C. 794d), as amended in 1998. Section 508 requires that individuals with disabilities, who are members of the public seeking information or services from us, have access to and use of information and data that is comparable to that provided to the public who are not

387

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disclaimer This system is made available by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product or process disclosed, or represents that its use would not infringe on privately owned rights Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of originators expressed herein do not necessarily state or reflect those of

388

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 Meeting 3 Meeting 2012 Meeting 2010 Meeting 2009 Meeting 2008 Meeting 2007 Meeting 2006 Meeting 2011 Hydropower Meeting The 2011 Regional Hydropower Council and Meeting were hosted by the Kansas City District of the U.S. Army Corps of Engineers in Kansas City, Missouri. Click the links below to view materials from the council and meeting. The Vicksburg District will host the 2012 Regional Hydropower Council and Meeting, tentatively scheduled for June 12-14, 2012, in Hot Springs, Arkansas. June 14-15, 2011, Council Skip Navigation Links 2011 Hydropower Council Agenda FY 2012 Proposed Project Packet FY 2013 Preliminary Project Packet June 15-16, 2011, Meeting Skip Navigation Links 2011 Hydropower Meeting Agenda Crane Rehabilitation Hydro Optimization in the Pacific Northwest

389

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Meeting 8 Meeting 2006 Meeting 2007 Hydropower Meeting The 2007 Regional Hydropower Council and Meeting were hosted by the Vicksburg District of the U.S. Army Corps of Engineers in Vicksburg, Mississippi. Click the links below to view materials from the council and Meeting. June 12, 2007, Council Skip Navigation Links Bull Shoals Switchyard Feeder Repair Hydropower Council Agenda Preliminary FY 2009 Projects Proposed FY 2008 Projects June 13, 2007, Meeting Skip Navigation Links Corps Budget Process Hydraulic Steel Structures Hydropower Meeting Agenda Hydropower Customer Drought Perspective Kansas City Projects Impacting Hydropower Little Rock Projects Impacting Hydropower NERC Reliability Standards and Mandatory Compliance NERC Requirements Matrix Ozark Major Rehabilitation

390

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southwestern Duty Locations Southwestern Duty Locations The City of Gore, Oklahoma, established in 1903 at the southern edge of the Cherokee Nation in eastern Oklahoma, is known as the "Trout Capital of Oklahoma" owing to its location near many pristine lakes and rivers. In addition to year-round fishing, the area offers camping, hunting, scuba diving, and many other outdoor activities. The city itself boasts a number of antique stores and sponsors annual events such as car shows, arts and crafts festivals, and music festivals. With a population of approximately 1,000, Gore offers country living within easy highway driving of the larger cities of Tulsa, Oklahoma (74 miles) and Fort Smith, Arkansas (45 miles). back to top The City of Jonesboro, Arkansas, established in 1859, is the farming,

391

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business USA Business USA FedBizOpps FedConnect Federal Acquisition Regulation (FAR) System for Award Management (SAM) Small Business Southwestern's policy is to provide the most opportunities possible in its acquisition process to small businesses, historically underutilized business (HUB) zone small business concerns, small disadvantaged business concerns, women owned small business concerns, service disabled veteran owned small businesses, and veteran owned small businesses. Southwestern promotes small business by: Meeting with small businesses to provide guidance and information Encouraging prime contractors to subcontract with small business concerns Publicizing contract actions to web sites dedicated to Federal business opportunities Matching our requirements with small business capabilities

392

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Preventing and mitigating losses Protecting information Providing a safe and secure work environment Emergency Response Planning Southwestern has developed Continuity of...

393

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chris Turner wanted to make sure that we continued to follow Southwestern's safety guidelines. We conducted all of our work in a safe manner and held our safety...

394

WESTERN AREA POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... 99 DISCUSSION FOR ANCILLARY SERVICE - SCHEDULING, SYSTEM CONTROL AND DISPATCH SERVICE AND REACTIVE SUPPLY AND VOLTAGE CONTROL...

395

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Low Income Energy Efficiency Workgroup Meeting 2 Date: January 27, 2014 Time: 8:30 am-12:30 pm Pacific Location: PNGC, 711 Halsey Street, Portland and by phone LiveMeeting click...

396

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy for Allocating Energy Efficiency Savings Introduction Under the Post-2011 framework, BPA assumes that public utility customers will self-fund, 1 Definition i.e., not request...

397

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Low Income Energy Efficiency Workgroup Meeting 1 Date: November 6, 2014 Time: 1:00 pm - 4:30 pm Pacific Location: PNGC, 711 Halsey Street, Portland and by phone LiveMeeting click...

398

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

concurrent Arrow provisional draft rights under the Libby Coordination Agreement (LCA), LCA provisional draft rights will take precedence and energy deliveries under this...

399

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to make funds available in the Unassigned Account As we begin fiscal year 2015 BPA is allocating approximately 3.66 million to the Unassigned Account. These funds were originally...

400

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Performance Payment Calculator The performance payment calculator will be used only Instructions when a utility wants to request less than the maximum total performance payment...

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Non-Reportable Deemed Measures & Custom Projects These instructions are supplemental to the existing instructions for the Deemed Measure Upload Template and the Option 2 Custom...

402

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brown Bag: Simple Steps Program Update Presentation When: Thurs., Dec. 11, 2014 Time: 12:00 - 1:00 p.m. PST Presentation and Discussion: BPA recently re-competed the Simple Steps,...

403

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brown Bag: Simple Steps Program Update Presentation When: Wed., Dec. 3, 2014 Time: 12:00 - 1:00 p.m. PST Presentation and Discussion: BPA recently re-competed the Simple Steps,...

404

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

June 20, 2014 Time: 9:00 am - 3:00pm Pacific Location: BPA Rates Hearing Room 1201 Lloyd Blvd, Suite 200, Portland, Oregon or by LiveMeeting Click here and telephone...

405

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8312012 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N File Naming Tool: Detailed Instructions 1. Select the Cell Labeled Document Type and use the dropdown menu to...

406

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Retail Sales Allocation Tool (RSAT) Now Available for FY2015 The Simple Steps program is happy to announce the Retail Sales Allocation Tool (RSAT) for FY2015. There are some great...

407

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Progress Payment Calculator The Progress Payment Calculator allows utilities to submit detailed information for the qualifying pre-approved progress payments. In order to qualify...

408

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Update on Fast-Moving Residential LED Measures The current BPA Residential Lighting measures provided in the Interim Reference Deemed Measure List do not include savings or payment...

409

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Rules Regarding the Large Project Fund (LPF) Updated: February 21, 2012 The Large Project Fund (LPF) will be used to provide incentives to customer utilities (customers)...

410

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interim Reporting Solution: File Naming Tool What it is: The interim reporting system which will be conducted through BPA's Customer Portal will require that documents submitted...

411

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

942012 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Overview: Performance Payment Calculator What it is The Performance Payment Calculator is the tool BPA has...

412

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Overview: Progress Payment Calculator What it is The Progress Payment Calculator allows utilities to submit detailed information for the qualifying pre- approved progress payments....

413

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance on Bilateral Transfers of Energy Efficiency Incentive Funds Introduction As part of BPA's Energy Conservation Agreements (ECA), each of BPA's public utility customers,...

414

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Application for Proposed Use of Southwestern Rights-of-Way Right-of-Way FAQ Right-Of-Way Safety Brochure Right-of-Way A right-of-way is a safety zone around Southwestern's high...

415

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in employment on the basis of race, color, religion, sex, national origin, political affiliation, sexual orientation, marital status, disability, age, membership in an...

416

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Danny Johnson Named Director of Maintenance Danny Johnson Named Director of Maintenance Danny Johnson Danny Johnson has been selected as Director of the Division of Maintenance at...

417

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2014 Meeting 2013 Meeting 2012 Meeting 2011 Meeting 2010 Meeting 2009 Meeting 2008 Meeting 2007 Meeting 2006 Meeting Hydropower Meeting The Southwestern Regional Hydropower Council...

418

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News & Publications Annual Performance Plan Annual Report Newsletters Strategic Plan SWPA - Overview Video System Map Annual Reports Skip Navigation Links 2013 Annual Report 2012...

419

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Doug Johnson Named Director of System Protection and Communications Doug Johnson Named Director of System Protection and Communications Doug Johnson Doug Johnson has been selected...

420

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News & Publications Archived News Items Publications Skip Navigation Links Annual Performance Plan Annual Report Newsletters Strategic Plan SWPA - Overview Video System Map...

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business USA FedBizOpps FedConnect Federal Acquisition Regulation (FAR) System for Award Management (SAM) Payment to Vendors In order to promote electronic government (e-gov) as...

422

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rate Notices June 2, 2014 - NOTICE October 7, 2013 - NOTICE October 7, 2013 - NOTICE October 25, 2012 - NOTICE Contact swparates@swpa.gov Last Updated: June 04...

423

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Office of Economic Impact & Diversity DOE EEO Summary Statistics Equal Employment Opportunity & Diversity Policy Statement Prevention of Harassment & Retaliation Policy...

424

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carlos Valencia Named Director of Transmission Engineering and Planning Carlos Valencia Named Director of Division of Transmission Engineering and Planning Carlos Valencia Carlos...

425

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SWPA Crime Witness Program 918-728-5742 Crime Witness Program Southwestern needs your help. Because much of our electrical transmission lines and equipment is located in secluded,...

426

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Notice For statistical purposes only, Southwestern collects the following data: IP addresses of users who visit our Web site Dates of average Web site activity Most viewed...

427

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monday Tuesday Wednesday Thursday Friday Saturday Sunday Generation Schedules Southwestern provides a current day schedule - online using the links to the left and by telephone at...

428

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computers for Learning Personal Property Disposal Real Property Disposal Property Disposal Southwestern is required to dispose of real and personal property when it is no longer...

429

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business USA FedBizOpps FedConnect Federal Acquisition Regulation (FAR) System for Award Management (SAM) Becoming a Vendor Southwestern is dedicated to supporting small business,...

430

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

business needs while accomplishing our mission of marketing and delivering Federal hydropower." Turner says the key to doing this was to realign what were essentially engineering...

431

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

VK-22 a.k.a. tract V-K-2-A-22 along the Vancouver-Kelso transmission line operated as Ross-Lexington No. 1; including any amendments to same." Response: BPA has provided all...

432

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

under the Freedom of Information Act (FOIA), 5 U.S.C. 552. Enclosed please find our CD-ROM containing "...the mean 15 minute load for the months of Jul) and December 2009 for the...

433

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Email stever@abacusrm.com rons@abacusrm.com Company Airclean Technologies Expertise Pumps, fans, and motor systems. Pulp & paper, petroleum, cement, steel, wastewater, wood...

434

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

General Requirements General Requirements for Interconnection Interconnections Southwestern accepts requests from wholesale entities for interconnection to Southwestern's transmission system. The party requesting interconnection is responsible for all costs incurred by Southwestern associated with the proposed interconnection, including costs associated with study and initial planning, environmental review, detailed design, and construction. Funds for such costs must be provided to Southwestern by the party requesting interconnection prior to any work being performed by Southwestern. Any advanced funds not expended by Southwestern are returned to the party requesting interconnection once all work associated with the interconnection is completed. Southwestern will generally require ownership

435

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FOIA/Privacy Act FOIA/Privacy Act Submit a FOIA Request DOE FOIA Requester Service Center Electronic Reading Room FOIA Links Freedom of Information Act The Freedom of Information Act (FOIA), enacted in 1966 (5 U.S.C. § 552; implemented by DOE regulations at 10 C.F.R. §1004), allows individuals to obtain documents in the possession and control of agencies within the Executive Branch of the Federal Government. FOIA requests require Southwestern to conduct a search of existing documents to determine whether any are responsive to the request. Southwestern is not required to create a document in order to respond to a FOIA request or to answer questions posed under FOIA requests. FOIA and e-FOIA requests must: be in writing; be identified as a "Freedom of Information Act Request;"

436

Planning Amid Abundance: Alaskas FY 2013 Budget Process  

E-Print Network [OSTI]

extreme dependence on depleting oil reserves and on federaldependence on depleting oil reserves and federal governmentReserve-Alaska (NPR-A), regarded as the most likely on-shore oil

McBeath, Jerry

2013-01-01T23:59:59.000Z

437

Categorical Exclusion Determinations: Alaska | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Alaska Categorical Exclusion Determinations: Alaska Location Categorical Exclusion Determinations issued for actions in Alaska. DOCUMENTS AVAILABLE FOR DOWNLOAD July 3, 2013 CX-011085: Categorical Exclusion Determination Alaska Wind Energy Research Project (formally "St. Paul Wind Technology Development Project, Phase 2") CX(s) Applied: A9, B2.2, B3.1 Date: 07/03/2013 Location(s): Alaska Offices(s): Golden Field Office July 3, 2013 CX-010690: Categorical Exclusion Determination Alaska Wind Energy Research Project CX(s) Applied: A9, B2.2, B3.1 Date: 07/03/2013 Location(s): Alaska Offices(s): Golden Field Office April 1, 2013 CX-010103: Categorical Exclusion Determination Alaska-TRIBE-ASSOCIATION OF VILLAGE COUNCIL PRESIDENTS, INC CX(s) Applied: B2.5, B5.1

438

Alaska | Building Energy Codes Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Map Printable Version Development Adoption Compliance Regulations Resource Center Alaska Last updated on 2013-12-10 Commercial Residential Code Change Current Code None Statewide Amendments / Additional State Code Information N/A Approved Compliance Tools State Specific Research Impacts of ASHRAE 90.1-2007 for Commercial Buildings in the State of Alaska (BECP Report, Sept. 2009) Approximate Energy Efficiency Effective Date Code Enforcement DOE Determination ASHRAE Standard 90.1-2007: No ASHRAE Standard 90.1-2010: No Energy cost savings for Alaska resulting from the state updating its commercial and residential building energy codes in accordance with federal law are significant, estimated to be on the order of nearly $50 million annually by 2030. Alaska DOE Determination Letter, May 31, 2013

439

Recovery Act State Memos Alaska  

Broader source: Energy.gov (indexed) [DOE]

Alaska Alaska For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

440

Alaska Renewable Energy Fund Grants for Renewable Energy Projects  

Broader source: Energy.gov [DOE]

The Alaska Energy Authority is offering grants for renewable energy projects funded by the Alaska State Legislature.

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Type B Accident Investigation of the Serious Personal Injury while Doble Testing at the Western Area Power Administration Hayden Substation, May 19, 1999  

Broader source: Energy.gov [DOE]

On May 19, 1999, at 10:31 a.m., four Western Area Power Administration (Western) employees were performing Doble testing on a circuit breaker at Hayden Substation in Routt County, Colorado. Three electricians were injured when the high-voltage lead (HVL) of the Doble test set encroached on the minimum approach distance to an energized part outside clearance boundaries, drawing arcing faults.

442

ROD for the Interconnection of the Griffith Power Plant With the Western Area Power Administration's Parker-Davis and Pacific Northwest-Pacific Southwest Intertie Transmission Systems (5/28/99)  

Broader source: Energy.gov (indexed) [DOE]

23 23 Federal Register / Vol. 64, No. 103 / Friday, May 28, 1999 / Notices 129, Main Street, Madison, ME 04950, (207) 696-1225. l. FERC contact: Nan Allen, nan.allen@ferc.fed.us, (202) 219-2948. m. Pursuant to 18 CFR 16.9(b)(1) each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by May 1, 2002. David P. Boergers, Secretary. [FR Doc. 99-13617 Filed 5-27-99; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration [DOE/EIS-0297] Record of Decision for the Interconnection of the Griffith Power Plant With the Western Area Power Administration's Parker-Davis and Pacific Northwest-Pacific Southwest

443

DOE/EIS-0312; Bonneville Power Administration, Fish and Wildlife Implementation Plan Draft EIS (5/2001)  

Broader source: Energy.gov (indexed) [DOE]

Draft EIS Draft EIS "Piecing The Puzzle Together" DOE/EIS-0312 June 2001 B i o l o g i c a l O p i n i o n s P u b l i c B e n e f i t s P a c i f i c S a l m o n T r e a t y C o l u m b i a R i v e r F i s h e r y M a n a g e m e n t P l a n S t a t e P la n s T r i b a l P l a n s A r t i f i c i a l P r o p a g a t i o n B . A . L o w e r S n a k e F e a s i b i l i t y S t u d y E I S Wy-Kan-Ush- Mi Wa- Kush-Wit P o w e r C o u n c i l P l a n M O A ( M e m o r a n d u m o f A g r e e m e n t ) F e d e r a l C a u c u s A l l H P a p e r Wildlife Program EIS F r a m e w o r k P a p e r W a t e r s h e d M g m t . P r o g r a m E I S S O R E I S ( S y s t e m O p e r a t io n s R e v i e w ) BPA Business Plan EIS I C B E M P E I S ( I n t e r io r C o l u m b ia B a s in E c o s y s t e m M g m t . P r o je c t ) Governance Structure C a n a d i a n I s s u e s P r i v a t e I n t e r e s t s C o m m e r c i a l I n t e r e s t s ? ? Volume 1: Environmental Analyses Fish and Wildlife Implementation Plan DEIS Cover Sheet Fish & Wildlife Implementation Plan Draft Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA)

444

Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska  

SciTech Connect (OSTI)

The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

NONE

1998-05-01T23:59:59.000Z

445

Alaska Rural Energy Conference | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Rural Energy Conference Alaska Rural Energy Conference September 23, 2014 12:00PM EDT to September 25, 2014 9:00PM EDT Fairbanks, AK http:www.akruralenergy.org...

446

Ionosphere Research Lab Sparks Fears in Alaska  

Science Journals Connector (OSTI)

...Angeles, 325 kilometers down the road from HAARP in Chena Hot Springs, Alaska. The HAARP facility...Angeles, 325 kilometers down the road from HAARP in Chena Hot Springs, Alaska. The HAARP facility, with three times the...

Lisa Busch

1997-02-21T23:59:59.000Z

447

October 15, 2002 Mr. Stephen Wright, Administrator  

E-Print Network [OSTI]

October 15, 2002 Mr. Stephen Wright, Administrator Bonneville Power Administration Routing A-1 P Power Administration: A Regional Dialogue on Options for Service After 2006 Dear Administrator Wright;Administrator Stephen Wright Chairman Frank Cassidy October 15, 2002 Page 2 Canby would have welcomed

448

Alaska - State Energy Profile Overview - U.S. Energy Information  

U.S. Energy Information Administration (EIA) Indexed Site

State Energy Profile Overview - U.S. Energy Information State Energy Profile Overview - U.S. Energy Information Administration (EIA) The page does not exist for . To view this page, please select a state: United States Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware District of Columbia Florida Georgia Hawaii Idaho Illinois Indiana Iowa Kansas Kentucky Louisiana Maine Maryland Massachusetts Michigan Minnesota Mississippi Missouri Montana Nebraska Nevada New Hampshire New Jersey New Mexico New York North Carolina North Dakota Ohio Oklahoma Oregon Pennsylvania Rhode Island South Carolina South Dakota Tennessee Texas Utah Vermont Virginia Washington West Virginia Wisconsin Wyoming The page does not exist for . To view this page, please select a state: Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware District of Columbia Florida

449

Alaska Native Communities Receive Technical Assistance for Local Clean  

Broader source: Energy.gov (indexed) [DOE]

Communities Receive Technical Assistance for Local Communities Receive Technical Assistance for Local Clean Energy Development Alaska Native Communities Receive Technical Assistance for Local Clean Energy Development April 29, 2013 - 3:08pm Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Obama Administration's efforts to help Tribal communities across the country enhance their energy security and build a sustainable energy future, the Energy Department and the Denali Commission today announced that five Alaska Native communities will receive technical expertise through the Strategic Technical Assistance Response Team (START) program. Building on five technical assistance awards made last year, the projects selected today will further accelerate local clean energy and energy efficiency projects that advance energy self-sufficiency

450

Alaska | OpenEI Community  

Open Energy Info (EERE)

Alaska Alaska Home Kyoung's picture Submitted by Kyoung(155) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White Papers On June 26th, we held the 3rd Quarter GRR Stakeholder Update at the Grand Sierra Resort in Reno, NV. The meeting was well-attended with over 40 attendees, including in-person and webinar attendance. Thanks to all who attended! Files: application/pdf icon Presentation: 3rd Quarterly Stakeholder Update Meeting application/vnd.openxmlformats-officedocument.presentationml.presentation icon Mock-up: GRR Permitting Wizard Interface Syndicate content 429 Throttled (bot load)

451

Pilgrim Hot Springs, Alaska  

Broader source: Energy.gov (indexed) [DOE]

data processing and use of FLIR - fast, cost effective method to measure natural heat loss * Pilgrim Hot Springs Resource Development - baseload power for the Nome area....

452

An Analysis of the Effects of Background Variables on Attitudes and Policy at the Bonneville Power Administration.  

E-Print Network [OSTI]

?? The question is asked whether or not background, education, and training of middle and upper level bureaucratic personnel affects policy outcomes. The Bonneville Power (more)

Millam, Philip George

1973-01-01T23:59:59.000Z

453

Categorical Exclusion Determinations: Alaska | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 3, 2010 November 3, 2010 CX-004353: Categorical Exclusion Determination Alaska-Tribe-Nanwalek (Also Known As English Bay) CX(s) Applied: A9, A11 Date: 11/03/2010 Location(s): Nanwalek, Alaska Office(s): Energy Efficiency and Renewable Energy November 2, 2010 CX-004354: Categorical Exclusion Determination Alaska-Tribe-Village of Kotlik CX(s) Applied: A9, B2.5, B5.1 Date: 11/02/2010 Location(s): Kotlik, Alaska Office(s): Energy Efficiency and Renewable Energy October 27, 2010 CX-004312: Categorical Exclusion Determination Alaska-Tribe-Native Village of Scammon Bay CX(s) Applied: A9, A11, B2.5, B5.1 Date: 10/27/2010 Location(s): Scammon Bay, Alaska Office(s): Energy Efficiency and Renewable Energy October 1, 2010 CX-004006: Categorical Exclusion Determination Alaska-Tribe-Wrangel Cooperative Association

454

Categorical Exclusion Determinations: Alaska | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

29, 2010 29, 2010 CX-002910: Categorical Exclusion Determination Alaska-Tribe-Yakutat Tlingit Tribe CX(s) Applied: A9, A11, B5.1 Date: 06/29/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy June 22, 2010 CX-002786: Categorical Exclusion Determination Alaska-Tribe-Igiugig Tribal Village Council CX(s) Applied: A9, B5.1 Date: 06/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy June 22, 2010 CX-002785: Categorical Exclusion Determination Alaska-Tribe-Koniag, Inc. CX(s) Applied: B5.1 Date: 06/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy June 10, 2010 CX-002700: Categorical Exclusion Determination Alaska-Tribe-Leisnoi Village-Woody Island Tribal Council CX(s) Applied: B2.5, A9, B5.1 Date: 06/10/2010

455

A Heart Health Alaska Natives  

E-Print Network [OSTI]

Honoring the Gift of Heart Health A Heart Health Educator's Manual for Alaska Natives U . S . D E Health Service Office of Prevention, Education, and Control #12;Honoring the Gift of Heart Health A Heart National Heart, Lung, and Blood Institute and Indian Health Service NIH Publication No. 06-5218 Revised

Bandettini, Peter A.

456

GRR/Section 9-AK-a - Alaska Environmental Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 9-AK-a - Alaska Environmental Process GRR/Section 9-AK-a - Alaska Environmental Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-AK-a - Alaska Environmental Process 09AKAStateEnvironmentalProcess (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Regulations & Policies AS 38.05.035: Powers & Duties of ADNR Director AS 38.05.082: Leases for Shore Fisheries AS 38.05.115: Conditions of Sale AS 38.05.850: Permits AS 38.05.945: Notice AS 38.05.946: Hearings Triggers None specified Click "Edit With Form" above to add content 09AKAStateEnvironmentalProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

457

Before The Subcommittee on Water and Power- House Committee on Natural Resources  

Broader source: Energy.gov [DOE]

Subject: Proposed FY 2015 Budget for the Western Area Power Administration By: Mark A. Gabriel, Administrator, Western Area Power Administration

458

Before The Subcommittee on Water and Power- House Energy and Natural Resources Committee  

Broader source: Energy.gov [DOE]

Subject: Proposed FY 2015 Budget for the Southeastern Power Administration By: Kenneth E. Legg, Administrator, Southeastern Power Administration

459

DOE/NREL supported wind energy activities in Alaska  

SciTech Connect (OSTI)

This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system, also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.

Drouilhet, S.

1997-12-01T23:59:59.000Z

460

March 13, 1968: Oil discovered on Alaska's North Slope | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

13, 1968: Oil discovered on Alaska's North Slope March 13, 1968: Oil discovered on Alaska's North Slope March 13, 1968: Oil discovered on Alaska's North Slope March 13, 1968 The...

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Jordan | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jordan | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

462

russia | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

russia | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

463

SOUTH-CENTRAL ALASKA NATURAL GAS STUDY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

South-Central Alaska Natural Gas Study South-Central Alaska Natural Gas Study Strategic Center for Natural Gas & Oil SOUTH-CENTRAL ALASKA NATURAL GAS STUDY Charles P. Thomas Tom C. Doughty David D. Faulder David M. Hite Final Report June 2004 Prepared for the U.S. Department of Energy National Energy Technology Laboratory Arctic Energy Office Contract DE-AM26-99FT40575 Page Intentionally Blank FOREWORD This assessment and analysis of south-central Alaska natural gas supply and demand was performed for the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) by Science Applications International Company's (SAIC) Alaska Energy Office, Anchorage, Alaska. The work was initiated in August 2003 and completed and published in June 2004 following reviews by the Steering Committee, state and federal stakeholders, local

464

Regulatory Commission of Alaska | Open Energy Information  

Open Energy Info (EERE)

Regulatory Commission of Alaska Regulatory Commission of Alaska Jump to: navigation, search Logo: Regulatory Commission of Alaska Name Regulatory Commission of Alaska Address 701 West Eight Ave., Suite 300 Place Anchorage, Alaska Zip 99501-3469 Phone number 907-276-6222 Website http://rca.alaska.gov/RCAWeb/h Coordinates 61.2143463°, -149.8931523° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.2143463,"lon":-149.8931523,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

465

Alaska Village Initiatives Rural Small Business Conference  

Broader source: Energy.gov [DOE]

The Alaska Village Initiatives 23rd Annual Rural Small Business Conference will bring together rural businesses and leaders and provide them with networking opportunities, training, and technical...

466

Alaska - CPCN General Information | Open Energy Information  

Open Energy Info (EERE)

CPCN General Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Alaska - CPCN General...

467

Geothermal Exploration At Akutan, Alaska- Favorable Indications...  

Open Energy Info (EERE)

development on Akutan Island. Akutan Island, Alaska is home to North America's largest seafood processing plant. The City of Akutan and the fishing industry have a combined peak...

468

Alaska Special Area Permit Application | Open Energy Information  

Open Energy Info (EERE)

Form: Alaska Special Area Permit Application Form Type ApplicationNotice Form Topic Fish and Game Special Area Permit Application Organization Alaska Department of Fish and...

469

Alaska Fish Habitat Permit Application | Open Energy Information  

Open Energy Info (EERE)

Form: Alaska Fish Habitat Permit Application Form Type ApplicationNotice Form Topic Fish Habitat Permit Organization Alaska Department of Fish and Game Published Publisher Not...

470

Alaska Sample Special Area Permit | Open Energy Information  

Open Energy Info (EERE)

to library General: Alaska Sample Special Area Permit Author Alaska Department of Fish and Game Published Division of Habitat, 122012 DOI Not Provided Check for DOI...

471

Climate, Conservation, and Community in Alaska and Northwest Canada  

Office of Energy Efficiency and Renewable Energy (EERE)

Climate, Conservation, and Community in Alaska and Northwest Canada is a joint Landscape Conservation Cooperative (LCC) and Alaska Climate Science Center (AK CSC) conference scheduled for November...

472

Financing Opportunities for Renewable Energy Development in Alaska...  

Broader source: Energy.gov (indexed) [DOE]

Opportunities for Renewable Energy Development in Alaska Financing Opportunities for Renewable Energy Development in Alaska This DOE Office of Indian Energy technical report...

473

RAPID/Geothermal/Exploration/Alaska | Open Energy Information  

Open Energy Info (EERE)

or jurisdiction. Permitting at a Glance State: Alaska Exploration Permit Agency (Pre-drilling): Alaska Division of Oil and Gas Exploration Permit (Pre-drilling): A plan of...

474

Alaska Division of Water Permit Fees | Open Energy Information  

Open Energy Info (EERE)

Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability:...

475

Infrared Cloud Imager Deployment at the North Slope of Alaska During Early 2002  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrared Cloud Imager Deployment Infrared Cloud Imager Deployment at the North Slope of Alaska During Early 2002 J. A. Shaw and B. Thurairajah Department of Electrical and Computer Engineering Montana State University Bozeman, Montana E. Edqvist National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado K. Mizutani Communications Research Laboratory Koganei, Tokyo, Japan Introduction Starting in February 2002, we deployed a new cloud-radiation sensor called the infrared cloud imager (ICI) at the North Slope of Alaska (NSA) site near Barrow, Alaska (71.32 N, 156.62 W). ICI records radiometrically calibrated images of the thermal infrared sky radiance in the 8µm to 14 µm wavelength band, from which spatial cloud statistics and spatially resolved cloud radiance can be determined.

476

,"Alaska Natural Gas LNG Storage Withdrawals (MMcf)"  

U.S. Energy Information Administration (EIA) Indexed Site

Alaska Natural Gas LNG Storage Withdrawals (MMcf)" Alaska Natural Gas LNG Storage Withdrawals (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Alaska Natural Gas LNG Storage Withdrawals (MMcf)",1,"Annual",2012 ,"Release Date:","12/12/2013" ,"Next Release Date:","1/7/2014" ,"Excel File Name:","na1340_sak_2a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/na1340_sak_2a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 5:42:15 PM"

477

Photo of the Week: Alaska's Future in Renewable Energy | Department of  

Broader source: Energy.gov (indexed) [DOE]

Alaska's Future in Renewable Energy Alaska's Future in Renewable Energy Photo of the Week: Alaska's Future in Renewable Energy August 13, 2013 - 12:53pm Addthis In Alaska's rural villages, many families struggle with the impact of high energy costs -- often times, almost half of a family's income is spent on fuel to power a home. To face this, the Department of Energy's Office of Indian Energy works closely with tribal nations, state government, NGOs and the private sector to help tribes develop the energy resources that exist on tribal lands. NANA is an organization that operates in northwest Alaska -- the region pictured in the pastoral landscape above. Through building businesses and using smart development of Alaskan resources, NANA's strategic energy plan involves expanding sources of renewable energy, with the goal of reducing the region's dependence on fossil fuels by 50 percent by the year 2025. Learn more about the Energy Department's efforts to reduce energy costs in Alaska. | Photo courtesy of NANA, Arend.

478

cost savings | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

cost savings | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing...

479

institutional research | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

institutional research | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the...

480

defense nuclear security | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

nuclear security | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

Note: This page contains sample records for the topic "alaska power administration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

nuclear security | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

security | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

482

Chernobyl Nuclear Accident | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Chernobyl Nuclear Accident | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

483

Nuclear Incident Team | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Incident Team | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing...

484

nuclear navy | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

navy | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

485

Appendix E References | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

E References | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing...

486

weapons material protection | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

weapons material protection | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering...

487

test and evaluation | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

test and evaluation | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

488

nuclear threat science | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

threat science | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing...

489

Nuclear Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

490

September 2011 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

491

Safeguards & Security | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

492

About SFO | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

493

Social Media | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

494

Facilities & Projects | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

495

Bonneville Power Administration Record of Decision for the Electrical Interconnection of the Summit/Westward Project (DOE/EIS-0183) (7/25/03)  

Broader source: Energy.gov (indexed) [DOE]

Summit/Westward Project Summit/Westward Project July 2003 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the proposed Summit/Westward Project ("Project") into the Federal Columbia River Transmission System (FCRTS) at BPA's Allston Substation. The Project, which has been proposed by Westward Energy, LLC (Westward Energy), involves construction and operation of a 520-megawatt (MW) natural-gas-fired, combined-cycle generating facility. The facility will be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon. The decision to offer terms to interconnect the Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan

496

ARM Climate Research Facilities on the North Slope of Alaska: Field Campaigns in 2007, New Facilities, and the International Polar Year  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Climate Research Facilities on the North Slope of Alaska: Climate Research Facilities on the North Slope of Alaska: Field Campaigns in 2007, New Facilities, and the International Polar Year Radiative Heating in Underexplored Bands Campaign (RHUBC): Feb 26 - Mar 14 2007 Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Contributors: Mark Ivey, Bernie Zak, Jeff Zirzow, Sandia National Labs Dana Truffer-Moudra, University of Alaska Fairbanks Hans Verlinde, Chad Bahrmann, Scott Richardson, Penn State University Winter

497

Wide-Area Energy Storage and Management system to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas  

SciTech Connect (OSTI)

The entire project addresses the issue of mitigating additional intermittency and fast ramps that occur at higher penetration of intermittent resources, including wind genera-tion, in the Bonneville Power Administration (BPA) and the California Independent Sys-tem Operator (California ISO) control areas. The proposed Wide Area Energy Storage and Management System (WAEMS) will address the additional regulation requirement through the energy exchange between the participating control areas and through the use of energy storage and other generation resources. For the BPA and California ISO control centers, the new regulation service will look no different comparing with the traditional regulation resources. The proposed project will benefit the regulation service in these service areas, regardless of the actual degree of penetration of the intermittent resources in the regions. The project develops principles, algorithms, market integration rules, functional de-sign and technical specifications for the WAEMS system. The project is sponsored by BPA and supported in kind by California ISO, Beacon Power Corporation, and the Cali-fornia Energy Commission (CEC).

Makarov, Yuri V.; Yang, Bo; DeSteese, John G.; Lu, Shuai; Miller, Carl H.; Nyeng, Preben; Ma, Jian; Hammerstrom, Donald J.; Vishwanathan, Vilanyur V.

2008-06-30T23:59:59.000Z

498

Wind Energy Alaska | Open Energy Information  

Open Energy Info (EERE)

Alaska Alaska Jump to: navigation, search Name Wind Energy Alaska Place Anchorage, Alaska Zip 99508 Sector Wind energy Product 50:50-owned subsidiary of Enxco and CIRI that is dedicated to developing and operating wind energy facilities along Alaska's Railbelt energy grid. Coordinates 38.264985°, -85.539014° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.264985,"lon":-85.539014,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

499

Categorical Exclusion Determinations: Alaska | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

April 7, 2010 April 7, 2010 CX-001571: Categorical Exclusion Determination Validation of Innovative Techniques - Pilgrim Hot Springs, Alaska CX(s) Applied: B3.1, A9 Date: 04/07/2010 Location(s): Pilgrim Hot Springs, Alaska Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 6, 2010 CX-001436: Categorical Exclusion Determination Source Characterization and Temporal Variation of Methane Seepage CX(s) Applied: B3.1, B3.8 Date: 04/06/2010 Location(s): Alaska Office(s): Fossil Energy, National Energy Technology Laboratory March 29, 2010 CX-006880: Categorical Exclusion Determination Alaska-Tribe-Native Village of Port Lions CX(s) Applied: A9, B3.6, B5.1 Date: 03/29/2010 Location(s): Native Village of Port Lions, Alaska Office(s): Energy Efficiency and Renewable Energy

500

Alaska Natural Gas Summary  

Gasoline and Diesel Fuel Update (EIA)

5.63 7.39 2.93 3.17 1967-2010 5.63 7.39 2.93 3.17 1967-2010 Exports 6.21 7.69 8.59 12.19 12.88 15.71 1989-2012 Pipeline and Distribution Use 1970-2005 Citygate 6.75 6.74 8.22 6.67 6.53 6.14 1988-2012 Residential 8.68 8.72 10.23 8.89 8.77 8.47 1967-2012 Commercial 7.57 8.66 9.51 8.78 8.09 8.09 1967-2012 Industrial 4.67 5.49 4.02 4.23 3.84 5.11 1997-2012 Electric Power 3.58 W W W 5.04 4.32 1997-2012 Dry Proved Reserves (Billion Cubic Feet) Proved Reserves as of 12/31 11,917 7,699 9,101 8,838 9,424 1977-2011 Adjustments 1 -3 3 1 -1 1977-2011 Revision Increases 2,147 184 1,868 622 928 1977-2011 Revision Decreases 112 4,068 108 452 206 1977-2011 Sales 10 0 5 131 36 2000-2011 Acquisitions 6 0 0 0 221 2000-2011 Extensions