National Library of Energy BETA

Sample records for air preconstruction permit

  1. Form PI-1 General Application for Air Preconstruction Permit...

    Open Energy Info (EERE)

    PI-1 General Application for Air Preconstruction Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Form PI-1 General Application for Air...

  2. File:Form PI-1 Air Pre-Construction Permit.pdf | Open Energy...

    Open Energy Info (EERE)

    metadata was last modified 10:27, 11 June 2013 Software used Acrobat PDFMaker 9.1 for Word Short title TCEQ-PI-1 General Application for Air Preconstruction Permit and Amendment...

  3. Preconstruction schedules, costs, and permit requirements for electric power generating resources in the Pacific Northwest

    SciTech Connect (OSTI)

    Hendrickson, P.L.; Smith, S.A.; Thurman, A.G.; Watts, R.L.; Weakley, S.A.

    1990-07-01

    This report was prepared for the Generation Programs Branch, Office of Energy Resources, Bonneville Power Administration (BPA). The principal objective of the report is to assemble in one document preconstruction cost, schedule, and permit information for twelve specific generating resources. The report is one of many documents that provide background information for BPA's Resource Program, which is designed to identify the type and amount of new resources that BPA may have to add over the next twenty years to maintain an adequate and reliable electric power supply in the Pacific Northwest. A predecessor to this report is a 1982 report prepared by the Pacific Northwest Laboratory (PNL) for the Northwest Power Planning Council (the Council''). The 1982 report had a similar, but not identical, content and format. 306 refs., 14 figs., 22 tabs.

  4. Washington Environmental Permit Handbook - Air Operating Permit...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Washington Environmental Permit Handbook - Air Operating PermitPermitting...

  5. Colorado Air Pollution Control Division - Construction Permits...

    Open Energy Info (EERE)

    Pollution Control Division - Construction Permits Forms and Air Pollutant Emission Notices (APENs) Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site:...

  6. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Permits Permits We are committed to meeting our environmental requirements for air, waste, and water quality permitting. Contact Environmental Communication & Public...

  7. OAR 340-216 - Air Contaminant Discharge Permits | Open Energy...

    Open Energy Info (EERE)

    OAR 340-216 - Air Contaminant Discharge PermitsLegal Abstract Regulations for air contaminant discharge permits issued by the Department of Environmental Quality....

  8. Oregon Air Contaminant Discharge Permits Webpage | Open Energy...

    Open Energy Info (EERE)

    Air Contaminant Discharge Permits Webpage Citation Oregon Department of Environmental Quality. Oregon Air Contaminant Discharge Permits Webpage Internet. State of Oregon....

  9. Utah DEQ Air Permitting Branch Webpage | Open Energy Information

    Open Energy Info (EERE)

    link for Utah DEQ Air Permitting Branch Webpage Citation Utah Department of Environmental Quality. Utah DEQ Air Permitting Branch Webpage Internet. State of Utah. cited 201411...

  10. Fact Sheet - Air Quality Permitting | Open Energy Information

    Open Energy Info (EERE)

    Air Quality Permitting Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Fact Sheet - Air Quality...

  11. Nevada Air Quality Permitting Webpage | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Air Quality Permitting Webpage Abstract Provides information on air quality permitting....

  12. Hawaii Air Pollution Control Permits Webpage | Open Energy Information

    Open Energy Info (EERE)

    Air Pollution Control Permits Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Air Pollution Control Permits Webpage Abstract Information...

  13. Hanford Site air operating permit application

    SciTech Connect (OSTI)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  14. Property:AirQualityPermitProcess | Open Energy Information

    Open Energy Info (EERE)

    property "AirQualityPermitProcess" Showing 1 page using this property. R RAPIDGeothermalAir QualityAlaska + The Air Permit process in Alaska is divided into two divisions: Title...

  15. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The operating permit program, under Title V of the Clean Air Act, streamlines the way authorities regulate air pollution by consolidating all air pollution control requirements ...

  16. Idaho DEQ Air Quality Permits Applicant and DEQ Responsibilities...

    Open Energy Info (EERE)

    Air Quality Permits Applicant and DEQ Responsibilities guidebook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  17. Washington Air Quality Notice of Construction Permit Regulatory...

    Open Energy Info (EERE)

    Air Quality Notice of Construction Permit Regulatory Handbook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  18. Nevada Bureau of Air Pollution Control Permit Forms Webpage ...

    Open Energy Info (EERE)

    Bureau of Air Pollution Control Permit Forms Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Bureau of Air Pollution Control Permit...

  19. Property:AirQualityPermitAgency | Open Energy Information

    Open Energy Info (EERE)

    property "AirQualityPermitAgency" Showing 1 page using this property. R RAPIDGeothermalAir QualityAlaska + Alaska Department of Environmental Conservation + Retrieved from...

  20. Nevada Air Quality Control Permitting Guidance Webpage | Open...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Air Quality Control Permitting Guidance Webpage Abstract Provides overview of air quality...

  1. New Mexico Air Operating Permit List of Trivial Activities |...

    Open Energy Info (EERE)

    Operating Permit List of Trivial Activities Author New Mexico Environment Department - Air Quality Bureau Published New Mexico Environment Department - Air Quality Bureau, 2008...

  2. Colorado Construction Air Permit Application | Open Energy Information

    Open Energy Info (EERE)

    for a construction permit for construction of a commercial or industrial source of air pollution. Form Type ApplicationNotice Form Topic Air Pollution Control Division -...

  3. WSDE Air Operating Permits Register Entries webpage | Open Energy...

    Open Energy Info (EERE)

    Entries webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: WSDE Air Operating Permits Register Entries webpage Abstract This register...

  4. Air Permit Program Information Page | Open Energy Information

    Open Energy Info (EERE)

    LibraryAdd to library Web Site: Air Permit Program Information Page Author Division of Air Quality Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for...

  5. Alaska Air Permit Program Webpage | Open Energy Information

    Open Energy Info (EERE)

    LibraryAdd to library Web Site: Alaska Air Permit Program Webpage Author Division of Air Quality Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for...

  6. Air Permit Program Application Forms | Open Energy Information

    Open Energy Info (EERE)

    LibraryAdd to library Web Site: Air Permit Program Application Forms Author Division of Air Quality Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for...

  7. Effect of Title V air permitting on pipeline operations

    SciTech Connect (OSTI)

    Bost, R.C.; Donnan, G.T.

    1995-12-31

    Pursuant to the passage of the Clean Air Act Amendments of 1990, the US Environmental Protection Agency has promulgated what are known as Title V permitting requirements for major sources of air pollutants, including pipeline operations. In contrast to most existing air permitting programs, the new Title V regulations will require periodic certification of compliance with applicable air regulations. In the same way that water dischargers report their own discharge violations to regulatory agencies pursuant to the NPDES permitting system, Title V permittees must implement an acceptable monitoring program and similarly report violations of permit conditions or applicable air regulations. Only those facilities whose potential emissions are less than or can be controlled to be less than certain regulatory limits will be exempt from standard Title V permitting. If a facility`s throughput or the concentration levels of certain volatile toxic levels in a particular crude or natural gas were to exceed corresponding regulatory limits, then the facility could be in violation. If an operator were to expand a field, then the changes in the gathering system and emission levels could constitute a violation. Constraints on operations can be avoided by careful strategizing of an operator`s Title V permit application.

  8. Pre-Construction Notification | Open Energy Information

    Open Energy Info (EERE)

    Construction Notification Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Pre-Construction NotificationLegal Published NA Year...

  9. File:5 CCR 1001-5 Colorado Stationary Source Permitting and Air...

    Open Energy Info (EERE)

    5 CCR 1001-5 Colorado Stationary Source Permitting and Air Pollution Control Emission Notice Requirements.pdf Jump to: navigation, search File File history File usage Metadata...

  10. 5 CCR 1001-5 Colorado Stationary Source Permitting and Air Pollution...

    Open Energy Info (EERE)

    -5 Colorado Stationary Source Permitting and Air Pollution Control Emission Notice Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: 5 CCR...

  11. Preconstruction of the Honey Lake Hybrid Power Plant

    SciTech Connect (OSTI)

    Not Available

    1988-04-30

    The work undertaken under this Contract is the prosecution of the preconstruction activities, including preliminary engineering design, well field development, completion of environmental review and prosecution of permits, and the economic and financial analysis of the facility. The proposed power plant is located in northeastern California in Lassen County, approximately 25 miles east of the town of Susanville. The power plant will use a combination of wood residue and geothermal fluids for power generation. The plant, when fully constructed, will generate a combined net output of approximately 33 megawatts which will be sold to Pacific Gas and Electric Company (PG E) under existing long-term power sales contracts. Transfer of electricity to the PG E grid will require construction of a 22-mile transmission line from the power plant to Susanville. 11 refs., 12 figs., 7 tabs.

  12. NMAC 20.2.70 Air Quality Operating Permits | Open Energy Information

    Open Energy Info (EERE)

    0 Air Quality Operating Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NMAC 20.2.70 Air Quality Operating...

  13. NMAC 20.2.71 Air Quality Operating Permit Emissions Fees | Open...

    Open Energy Info (EERE)

    1 Air Quality Operating Permit Emissions Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NMAC 20.2.71 Air Quality...

  14. NMAC 20.2.72 Air Quality Construction Permits | Open Energy Informatio...

    Open Energy Info (EERE)

    2 Air Quality Construction Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NMAC 20.2.72 Air Quality Construction...

  15. 23 CFR 630 - Preconstruction Procedures | Open Energy Information

    Open Energy Info (EERE)

    23 CFR 630 - Preconstruction ProceduresLegal Abstract This section sets forth the procedures relating to the preparation, submission and approval of plans for...

  16. NAC 445B.287 et seq - Air Pollution Control Operating Permits...

    Open Energy Info (EERE)

    287 et seq - Air Pollution Control Operating Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NAC 445B.287 et seq -...

  17. Federal operating permits program under Title V of the Clean Air Act. Final report

    SciTech Connect (OSTI)

    1996-08-01

    ;Table of Contents: Introduction; Transition Between Parts 70 and 71; Title V Obligations and Applicability; Synthetic Minors, Potential to Emit, and Transition Policy; Permit Application Step and Content; Flexible Permit Approaches; Hazardous Air Pollution Program Requirements for Title V; Information Sources; Appendix A. EPA Memoranda; and Appendix B. Seminar Overhead Transparencies.

  18. Pre-construction Activities for Phase 1 of Shu'luuk Wind Project

    SciTech Connect (OSTI)

    Connolly, Michael

    2015-07-01

    Final Report on pre-construction activities grant for the Shu'luuk Wind project on the Campo Indian Reservation

  19. State air pollution permit program under subchapter 5 of the Clean Air Act as of August 8, 1995. Master`s thesis

    SciTech Connect (OSTI)

    Smith, J.M.

    1995-05-01

    The Clean Air Act Amendments of 1990 imposed the requirement for a comprehensive set of state air pollution permit programs on a nationwide basis for the first time. Prior to the passage of this law, there were about thirty-five state permit programs, and they were not subject to Federal supervision. During the debate in the House of Representives it was stated that the purpose of the permit program was to clarify and make more enforceable a source`s pollution control requirements. In addition, the Congress wanted to encourage public involvement in the process so that interested citizens will be able to review and help enforce a source`s obligations under the Act.

  20. Determining enforceability of air quality requirements for the Title V permit

    SciTech Connect (OSTI)

    Raasch, C.W.; Trinkle, J.A.; Radocha, D.

    1997-12-31

    The focus of this paper is two-fold: (1) Outline the importance, from the perspective of the regulated source, of the identification of state-only enforceable requirements versus federally enforceable requirements in a Title V permit; (2) Describe how to determine the enforceability of requirements as part of a Title V permitting study, including available tools. Contained also in this paper is a case study of enforceability determinations of requirements included in the Title V permit for an integrated pulp and paper mill. The case study is presented to provide an impetus for sources to thoroughly review their draft Title V permits to ensure correct determinations of enforceability.

  1. Air Dispersion Modeling for the INL Application for a Synthetic Minor Sitewide Air Quality Permit to Construct with a Facility Emission Cap Component

    SciTech Connect (OSTI)

    Sondrup, Andrus Jeffrey

    2015-10-01

    The Department of Energy Idaho Operations Office (DOE-ID) is applying for a synthetic minor, Sitewide, air quality permit to construct (PTC) with a facility emission cap (FEC) component from the Idaho Department of Environmental Quality (DEQ) for Idaho National Laboratory (INL) to limit its potential to emit to less than major facility limits for criteria air pollutants (CAPs) and hazardous air pollutants (HAPs) regulated under the Clean Air Act. This document is supplied as an appendix to the application, Idaho National Laboratory Application for a Synthetic Minor Sitewide Air Quality Permit to Construct with a Facility Emissions Cap Component, hereafter referred to as “permit application” (DOE-ID 2015). Air dispersion modeling was performed as part of the permit application process to demonstrate pollutant emissions from the INL will not cause a violation of any ambient air quality standards. This report documents the modeling methodology and results for the air dispersion impact analysis. All CAPs regulated under Section 109 of the Clean Air Act were modeled with the exception of lead (Pb) and ozone, which are not required to be modeled by DEQ. Modeling was not performed for toxic air pollutants (TAPs) as uncontrolled emissions did not exceed screening emission levels for carcinogenic and non-carcinogenic TAPs. Modeling for CAPs was performed with the EPA approved AERMOD dispersion modeling system (Version 14134) (EPA 2004a) and five years (2000-2004) of meteorological data. The meteorological data set was produced with the companion AERMET model (Version 14134) (EPA 2004b) using surface data from the Idaho Falls airport, and upper-air data from Boise International Airport supplied by DEQ. Onsite meteorological data from the Grid 3 Mesonet tower located near the center of the INL (north of INTEC) and supplied by the local National Oceanic and Atmospheric Administration (NOAA) office was used for surface wind directions and wind speeds. Surface data (i

  2. RAPID/BulkTransmission/Environment/Texas | Open Energy Information

    Open Energy Info (EERE)

    to Electric Power Transmission CCP Art. 49 Inquests upon dead bodies Fact Sheet - Air Quality Permitting Form PI-1 General Application for Air Preconstruction Permit RRC -...

  3. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P.

    1998-12-31

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  4. The CAA Permit Review Process

    SciTech Connect (OSTI)

    Hyre, R.A.

    1995-06-01

    In the near future, all existing major sources will be required to submit an air permit application to the state or the Environmental Protection Agency (EPA) for review. This report details the permit review process, including information on state, EPA, affected states, judicial, and public review. It will also describe permit renewal, operational flexibility, off-permit changes, permit revisions, and permit reopenings.

  5. Idaho Permit to Construct Application Webpage | Open Energy Informatio...

    Open Energy Info (EERE)

    Idaho Permit to Construct Application Webpage Abstract This webpage provides access to air quality permitting forms and checklists for Idaho's air quality permitting process....

  6. QA procedures and emissions from nonstandard sources in AQUIS, a PC-based emission inventory and air permit manager

    SciTech Connect (OSTI)

    Smith, A.E.; Tschanz, J.; Monarch, M.

    1996-05-01

    The Air Quality Utility Information System (AQUIS) is a database management system that operates under dBASE IV. It runs on an IBM-compatible personal computer (PC) with MS DOS 5.0 or later, 4 megabytes of memory, and 30 megabytes of disk space. AQUIS calculates emissions for both traditional and toxic pollutants and reports emissions in user-defined formats. The system was originally designed for use at 7 facilities of the Air Force Materiel Command, and now more than 50 facilities use it. Within the last two years, the system has been used in support of Title V permit applications at Department of Defense facilities. Growth in the user community, changes and additions to reference emission factor data, and changing regulatory requirements have demanded additions and enhancements to the system. These changes have ranged from adding or updating an emission factor to restructuring databases and adding new capabilities. Quality assurance (QA) procedures have been developed to ensure that emission calculations are correct even when databases are reconfigured and major changes in calculation procedures are implemented. This paper describes these QA and updating procedures. Some user facilities include light industrial operations associated with aircraft maintenance. These facilities have operations such as fiberglass and composite layup and plating operations for which standard emission factors are not available or are inadequate. In addition, generally applied procedures such as material balances may need special treatment to work in an automated environment, for example, in the use of oils and greases and when materials such as polyurethane paints react chemically during application. Some techniques used in these situations are highlighted here. To provide a framework for the main discussions, this paper begins with a description of AQUIS.

  7. Kentucky Department for Natural Resources and Environmental Protection permit application for air contaminant source: SRC-I demonstration plant, Newman, Kentucky. [Demonstration plant at Newman, KY

    SciTech Connect (OSTI)

    none,

    1980-11-21

    This document and its several appendices constitute an application for a Kentucky Permit to Construct an Air Contaminant Source as well as a Prevention of Significant Air Quality Deterioration (PSD) Permit Application. The information needed to satisfy the application requirements for both permits has been integrated into a complete and logical description of the proposed source, its emissions, control systems, and its expected air quality impacts. The Department of Energy believes that it has made every reasonable effort to be responsive to both the letter and the spirit of the PSD regulations (40 CFR 52.21) and Kentucky Regulation No. 401 KAR 50:035. In this regard, it is important to note that because of the preliminary status of some aspects of the process engineering and engineering design for the Demonstration Plant, it is not yet possible precisely to define some venting operations or their associated control systems. Therefore, it is not possible precisely to quantify some atmospheric emissions or their likely impact on air quality. In these instances, DOE and ICRC have used assumptions that produce impact estimates that are believed to be worst case and are not expected to be exceeded no matter what the outcome of future engineering decisions. As these decisions are made, emission quantities and rates, control system characteristics and efficiencies, and vent stack parameters are more precisely defined; this Permit Application will be supplemented or modified as appropriate. But, all needed modifications are expected to represent either decreases or at worst no changes in the air quality impact of the SRC-I Demonstration Plant.

  8. Louisiana Title V General Permits

    SciTech Connect (OSTI)

    Boyer, B.E.; Neal, T.L.

    1995-12-31

    Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

  9. Hanford Site Air Operating Permit Application Supplemental Information [Sec 1 Thru 5] Vol 1 Thru 3 Appendices A Thru C

    SciTech Connect (OSTI)

    CURN, B.L.

    2000-05-01

    This report documents radionuclide air emissions from the Hanford Site in 1998 and the resulting effective dose equivalent to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (40 CFR 61), Subpart H: ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities,'' and with the Washington Administrative Code Chapter 246247, Radiation Protection - Air Emissions. The federal regulations in 40 CFR 61, Subpart H, require the measurement and reporting of radionuclides emitted from Department of Energy facilities and the resulting offsite dose from those emissions. A standard of 10 mrem/yr effective dose equivalent (EDE) is imposed on them. The EDE to the MEI due to routine emissions in 1998 from Hanford Site point sources was 1.3 E-02 mrem (1.3 E-04 mSv). which is 0.13 percent of the federal standard. Chapter 246-247 of the Washington Administrative Code (WAC) requires the reporting of radionuclide emissions from all Department of Energy Hanford Site sources. The state has adopted into these regulations the 40 CFR 61 standard of 10 mrem/yr EDE. The EDE to the MEI attributable to diffuse and fugitive radionuclide air emissions from the Hanford Site in 1998 was 2.5 E-02 mrem (2.S E-04 mSv). This dose added to the dose from point sources gives a total for all sources of 3.8 E-02 mrem/yr (3.8 E-04 mSv) EDE. which is 0.38 percent of the 10 mrem/yr standard. An unplanned release on August 26, 1998, in the 300 Area of the Hanford Site resulted in a potential dose of 4.1 E-02 mrem to a hypothetical individual at the nearest point of public access to that area. This hypothetical individual was not the MEI since the wind direction on the day of the release was away from the MEI residence. The potential dose from the unplanned event

  10. Industrial Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industrial Permit Industrial Permit The Industrial Permit authorizes the Laboratory to discharge point-source effluents under the National Pollutant Discharge Elimination System. October 15, 2012 Outfall from the Laboratory's Data Communications Center cooling towers Intermittent flow of discharged water from the Laboratory's Data Communications Center eventually reaches perennial segment of Sandia Canyon during storm events (Outfall 03A199). Contact Environmental Communication & Public

  11. Permitting Guides

    Broader source: Energy.gov [DOE]

    Standardized procedures for permitting hydrogen technologies and systems are not yet well established. As a first step, DOE sponsored the development of a new guide designed to help regulators sort...

  12. Washington Environmental Permit Handbook - NPDES General Permit...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Washington Environmental Permit Handbook - NPDES General Permit...

  13. Washington Environmental Permit Handbook - NPDES Individual Permit...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Washington Environmental Permit Handbook - NPDES Individual Permit...

  14. WAC - 173-401 Operating Permit Regulation | Open Energy Information

    Open Energy Info (EERE)

    Washington state air operating permit program consistent with the requirements of Title V of the Federal Clean Air Act. Published NA Year Signed or Took Effect 1993 Legal...

  15. Recent Title V operating permit program revisions

    SciTech Connect (OSTI)

    Nicewander, M.

    1995-12-31

    The purpose of this paper is to discuss recent EPA proposed regulations regarding required procedures to be incorporated into the state operating permit programs to accommodate permit revisions. The development and implementation of an operating permits program must balance air pollution control requirements with the ability of a source to meet changing market demands. This has been the major item of concern during the operating permits program development. Before discussing the specific procedures for revising operating permits, it is necessary to include some generic background information for familiarization with the operating permits program.

  16. Solar Permitting Law

    Broader source: Energy.gov [DOE]

    This legislation also addressed permitting fees for solar systems.  Counties and cities may not charge permit fees for solar permit applications specifically, but they can charge building permit ...

  17. Kentucky Department for Natural Resources and Environmental Protection permit application for air contaminant source: SRC-I demonstration plant, Newman, Kentucky. Supplement I. [Additional information on 38 items requested by KY/DNREP

    SciTech Connect (OSTI)

    Pearson, Jr., John F.

    1981-02-13

    In response to a letter from KY/DNREP, January 19, 1981, ICRC and DOE have prepared the enclosed supplement to the Kentucky Department for Natural Resources and Environmental Protection Permit Application for Air Contaminant Source for the SRC-I Demonstration Plant. Each of the 38 comments contained in the letter has been addressed in accordance with the discussions held in Frankfort on January 28, 1981, among representatives of KY/DNREP, EPA Region IV, US DOE, and ICRC. The questions raised involve requests for detailed information on the performance and reliability of proprietary equipment, back-up methods, monitoring plans for various pollutants, composition of wastes to flares, emissions estimates from particular operations, origin of baseline information, mathematical models, storage tanks, dusts, etc. (LTN)

  18. Construction and Minor Permit Applications | Open Energy Information

    Open Energy Info (EERE)

    to library Web Site: Construction and Minor Permit Applications Author Division of Air Quality Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for...

  19. Title V Operation Permit Application Webpage | Open Energy Information

    Open Energy Info (EERE)

    to library Web Site: Title V Operation Permit Application Webpage Author Division of Air Quality Published State of Alaska, Date Not Provided DOI Not Provided Check for DOI...

  20. City of Chicago - Green Permit Program | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    timeline for projects which are designed to maximize indoor air quality and conserve energy and resources. Green Permit Program Incentives Projects accepted into the Green...

  1. Federal Environmental Permitting Handbook. Environmental Guidance

    SciTech Connect (OSTI)

    Not Available

    1991-05-01

    The handbook consists of eight chapters addressing permitting and licensing requirements under the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA), the Atomic Energy Act (AEA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Federal Insectide, Fungicide, and Rodenticide Act (FIFRA), the Safe Drinking Water Act (SDWA), and the Toxic Substances Control Act (TSCA). Each chapter consists of: (1) an introduction to the statute and permitting requirements; (2) a diagram illustrating the relationship between permitting requirements under the statute being discussed and permitting requirements from other environmental statutes which may have to be addressed when applying for a particular permit (e.g., when applying for a RCRA permit, permits and permit applications under the CWA, CAA, SDWA, etc. would have to be listed in the RCRA permit application); and, (3) a compilation of the permitting requirements for the regulatory program resulting from the statute. In addition, the Handbook contains a permitting keyword index and a listing of hotline telephone numbers for each of the statutes.

  2. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the l...

  3. Storm Water Individual Permit.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NPDES Storm Water Individual Permit. Wednesday, January 22, 2014 5:30 p.m. Cities of Gold Conference Center 10 Cities of Gold Road, Pojoaque, NM The Individual Permit authorizes...

  4. Zoning and Permitting Resources

    Broader source: Energy.gov [DOE]

    Zoning and permitting is commonly controlled by local governments and may be applicable to both residential and commercial properties.

  5. Hanford Dangerous Waste Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dangerous Waste Permit Suzanne Dahl and Jeff Lyon Nuclear Waste Program April 17, 2012 Tank-Related Units Why have permits? * To regulate dangerous waste treatment, storage, and disposal facilities: - Thermal treatment units - Landfills - Tank systems - Container storage - Containment buildings * To protect humans and the environment Parts of the Unit Permit * Fact Sheet * Unit description * Operations and processes * Permit conditions * Requirements or limitations to maintain safe operating

  6. Oregon Water Quality Permit Program (Stormwater Discharge Permits...

    Open Energy Info (EERE)

    Permits) Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Water Quality Permit Program (Stormwater Discharge Permits) Website...

  7. Broward County Online Solar Permitting

    Broader source: Energy.gov [DOE]

    Broward County now offers Go SOLAR Online Permitting*, for rooftop solar photovoltaic system permitting. This online permitting system may be used for residential or low commercial properties that...

  8. CCS Project Permit Acquisition Protocols

    SciTech Connect (OSTI)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  9. Gearing up for Title 5 operating permits

    SciTech Connect (OSTI)

    Klaber, K.; Weiss, K. )

    1994-06-01

    Title 5 of the 1990 Clean Air Act Amendments (CAAA) establishes a massive new operating permit program, which will be administered by state agencies in accordance with federal guidelines. Formal requirements regarding operating-permits were promulgated by the US Environmental Protection Agency (EPA) on July 21, 1992 (40 CFR 70). The Title 5 program will require many chemical manufacturing facilities to apply for and obtain operating permits that address air emissions from the entire facility. A major impact of the Title 5 program is that facilities will now be required to implement measures to routinely demonstrate that they are operating in compliance with the terms of the permit. Otherwise, facilities will be considered out of compliance. Once the new permits are in place, the burden will be on the facility to prove routine compliance to prevent any enforcement action. According to EPA, the new permits are not intended to impose any new regulatory requirements on a facility. Rather, they will serve as an enforcement tool.

  10. Model operating permits for natural gas processing plants

    SciTech Connect (OSTI)

    Arend, C.

    1995-12-31

    Major sources as defined in Title V of the Clean Air Act Amendments of 1990 that are required to submit an operating permit application will need to: Evaluate their compliance status; Determine a strategic method of presenting the general and specific conditions of their Model Operating Permit (MOP); Maintain compliance with air quality regulations. A MOP is prepared to assist permitting agencies and affected facilities in the development of operating permits for a specific source category. This paper includes a brief discussion of example permit conditions that may be applicable to various types of Title V sources. A MOP for a generic natural gas processing plant is provided as an example. The MOP should include a general description of the production process and identify emission sources. The two primary elements that comprise a MOP are: Provisions of all existing state and/or local air permits; Identification of general and specific conditions for the Title V permit. The general provisions will include overall compliance with all Clean Air Act Titles. The specific provisions include monitoring, record keeping, and reporting. Although Title V MOPs are prepared on a case-by-case basis, this paper will provide a general guideline of the requirements for preparation of a MOP. Regulatory agencies have indicated that a MOP included in the Title V application will assist in preparation of the final permit provisions, minimize delays in securing a permit, and provide support during the public notification process.

  11. Annual Hanford Site environmental permitting status report

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1998-09-17

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  12. Statewide Solar Permitting Standards

    Broader source: Energy.gov [DOE]

    Two bills signed in 2012 (AB 1801 and SB 1222) place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. CA Government Code § 65850.55...

  13. Storm Water Individual Permit.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wednesday, January 22, 2014 5:30 p.m. Cities of Gold Conference Center 10 Cities of Gold Road, Pojoaque, NM The Individual Permit authorizes the discharge of storm water associated ...

  14. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

  15. Solar Construction Permitting Standards

    Office of Energy Efficiency and Renewable Energy (EERE)

    Municipalities and counties in Arizona may no longer require a stamp from a professional engineer to approve a solar system installation, which can raise the cost of a permit, unless such a certi...

  16. Wind Permitting Standards

    Office of Energy Efficiency and Renewable Energy (EERE)

    Wind farms above 5 MW capacity must receive a permit from the Ohio Power Siting Board before construction can begin.  The Ohio Power Siting Board is made up of representatives from several state...

  17. Modernizing Infrastructure Permitting

    Broader source: Energy.gov [DOE]

    On May 14, 2014, the Obama Administration released a comprehensive plan to accelerate and expand Federal infrastructure permitting reform government-wide. The Office of Electricity Delivery and Energy Reliability is actively engaged in this process for transmission development.

  18. RCRA post-closure permits

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The Resource Conservation and Recovery Act (RCRA) requires that hazardous waste management facilities operate in accordance with permits granted by the US Environmental Protection Agency (EPA) or a State authorized to carry out the RCRA Subtitle C program. Several categories of permits (including treatment, storage, and disposal permits; research, development, and demonstration permits; post-closure permits; emergency permits; permits-by-rule; and trial burn and land treatment demonstration permits) are issued under the RCRA Subtitle C program. This Information Brief focuses on post-closure permitting requirements under 40 CFR 270.1(c).

  19. 30 TAC, part 1, chapter 106 Permits by Rule | Open Energy Information

    Open Energy Info (EERE)

    These rules outline the sources which qualify for permits by rule for purposes of air quality control permits in Texas. Published NA Year Signed or Took Effect 1996 Legal...

  20. File:Permit factsheet.pdf | Open Energy Information

    Open Energy Info (EERE)

    state, some details may not fully reflect the modified file. Image title Fact Sheet - Air Quality Permitting Author TCEQ File change date and time 03:09, 6 August 2012 Date and...

  1. Hanford Facility RCRA permit handbook

    SciTech Connect (OSTI)

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  2. The Individual Permit for Stormwater

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Individual Permit for Stormwater The Individual Permit for Stormwater Community groups and their technical advisors have the opportunity to carefully review and comment on all ...

  3. Hanford Dangerous Waste Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Single-Shell Tank System Closing Unit #4 The tanks and surrounding contaminated soil are one of Hanford's greatest challenges. We don't really know the full extent of the risks yet. Removing wastes from the tanks will greatly reduce the risks. An ongoing risk assessment for the SST closures will ensure the risks are below acceptable levels. How does this part of the permit differ from the usual? SSTs do not comply with regulations, so the permit requires SSTs to be closed as soon as possible.

  4. Experience in automating the Title V permit application

    SciTech Connect (OSTI)

    Ashcraft, T.; O`Brien, J.

    1995-12-31

    Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

  5. Permit application modifications

    SciTech Connect (OSTI)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  6. RAPID/Geothermal/Air Quality/Alaska | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalAir QualityAlaska < RAPID | Geothermal | Air Quality Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  7. Oregon Air Contaminant Discharge Webpage | Open Energy Information

    Open Energy Info (EERE)

    library Web Site: Oregon Air Contaminant Discharge Webpage Abstract Provides overview of air quality discharge permit process. Author State of Oregon Published State of Oregon,...

  8. Hanford Dangerous Waste Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Treatment and Immobilization Plant (vit plant) Operating Unit #10 Aerial view of construction, July 2011 Where will the waste go? LAW canisters will go to shallow disposal at Hanford's Integrated Disposal Facility. HLW canisters will go to a For scale, here's the parking lot! Safe disposition of our nation's most dangerous waste relies on the vit plant's safe completion and ability to process waste for 20+ years. * Permitted for storage and treatment of Hanford's tank waste in unique

  9. Presidential Permits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Permits Presidential Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidential Permits - Canada View the Presidental Permits - Mexico PRESIDENTIAL PERMITS - CANADA BACK TO TOP Docket No. Company Date Issued PP-6 Puget Sound Energy 04/28/81 PP-10 BPA 10/27/45 PP-10-1 BPA 11/30/65 PP-11-2 Fraser Papers 02/29/99 PP-11 Fraser Papers (Rescinded in PP-366) 11/18/10 PP-12 Maine 12/05/63 PP-13 NiMo Hogansburg 01/31/48 PP-18 Glacier

  10. Portland's Residential Solar Permitting Guide

    Broader source: Energy.gov [DOE]

    This program guide outlines the application and review procedures for obtaining the necessary permit(s) to install a solar energy system for a new or existing residential building. The guide also...

  11. Presidential Permit Holders- Annual Reports

    Broader source: Energy.gov [DOE]

    Presidential permit holders are responsible for reporting the gross amount electric energy which flows into and out of the United States over the permitted international transmission facility regardless if the energy is wheeled to or for another entity.

  12. Hanford Dangerous Waste Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Double-Shell Tank System 204-AR Waste Unloading Facility Operating Unit #12 241-AP Tank Farm construction. See black pickup trucks for scale. The DSTs have limited capacity and are aging. Maintaining these tanks is important to ensure that waste is ready to supply the Waste Treatment Plant. The permit requires continuous leak detection to protect humans and the environment. 200 West & East * 28 tanks in 6 groups, or tank farms. * Capacity: 1 - 1.2 million gallons each. * The double-shell

  13. Hanford Dangerous Waste Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    We don't expect any risk from this site. The permit ensures operation and closure of this facility do not harm humans or the environment. Liquid Effluent Retention Facility Effluent Treatment Facility Operating Unit #3 What happens to the waste it receives? LERF has three lined basins with a capacity of 88.5 million liters. ETF removes or destroys dangerous waste in liquid waste. It uses treatments such as filters, reverse osmosis, pH adjustment, and ultraviolet light. Water is treated, then

  14. The Individual Permit for Stormwater

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Individual Permit for Stormwater The Individual Permit for Stormwater Community groups and their technical advisors have the opportunity to carefully review and comment on all decisions being made under the permit. August 1, 2013 Stormwater monitoring Stormwater monitoring The Individual Permit for Stormwater Eliminate contaminated stormwater discharges from specified Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) Use control measures called "best management

  15. Class 1 Permit Modification Notifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Number Granted Submitted * Expiration Current Permit Status 134. Office of New Mexico ... and Operating Instructions. Electrical Inspection. Position Transducer Calibration. ...

  16. Microsoft Word - Groundwater Discharge Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    State Renews Groundwater Discharge Permit for WIPP CARLSBAD, N.M., September 11, 2008 - The New Mexico Environment Department (NMED) has renewed the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) groundwater discharge permit until 2013. The permit regulates the discharge of water from WIPP facilities and operations to lined ponds, which protect groundwater resources. The permit allows WIPP to discharge domestic wastewater, non-hazardous wastewater and storm water into 13

  17. Class 1 Permit Modification Notification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bu il ding 1 Santa Fe, New Mexico 87505-6303 JUL 0 5 2011 Subject: Notification of a Class 1 Permit Modification to the Hazardous Waste Facility Permit, Permit Number: NM4890139088-TSDF Dear Mr. Kieling : Enclosed is a Class 1 Permit Modification Notification 1 0: * Update Emergency Coordinator list We certify under penalty of law that this document and the enclosure were prepared under our direction or supervision in

  18. Regulatory and Permitting Issues

    SciTech Connect (OSTI)

    Larry Myer

    2005-12-01

    As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

  19. Baseline air quality study at Fermilab

    SciTech Connect (OSTI)

    Dave, M.J.; Charboneau, R.

    1980-10-01

    Air quality and meteorological data collected at Fermi National Accelerator Laboratory are presented. The data represent baseline values for the pre-construction phase of a proposed coal-gasification test facility. Air quality data were characterized through continuous monitoring of gaseous pollutants, collection of meteorological data, data acquisition and reduction, and collection and analysis of discrete atmospheric samples. Seven air quality parameters were monitored and recorded on a continuous real-time basis: sulfur dioxide, ozone, total hydrocarbons, nonreactive hydrocarbons, nitric oxide, nitrogen oxides, and carbon monoxide. A 20.9-m tower was erected near Argonne's mobile air monitoring laboratory, which was located immediately downwind of the proposed facility. The tower was instrumented at three levels to collect continuous meteorological data. Wind speed was monitored at three levels; wind direction, horizontal and vertical, at the top level; ambient temperature at the top level; and differential temperature between all three levels. All continuously-monitored parameters were digitized and recorded on magnetic tape. Appropriate software was prepared to reduce the data. Statistical summaries, grphical displays, and correlation studies also are presented.

  20. Optimizing operational flexibility and enforcement liability in Title V permits

    SciTech Connect (OSTI)

    McCann, G.T.

    1997-12-31

    Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

  1. Air ejector augmented compressed air energy storage system

    DOE Patents [OSTI]

    Ahrens, Frederick W.; Kartsounes, George T.

    1980-01-01

    Energy is stored in slack demand periods by charging a plurality of underground reservoirs with air to the same peak storage pressure, during peak demand periods throttling the air from one storage reservoir into a gas turbine system at a constant inlet pressure until the air pressure in the reservoir falls to said constant inlet pressure, thereupon permitting air in a second reservoir to flow into said gas turbine system while drawing air from the first reservoir through a variable geometry air ejector and adjusting said variable geometry air ejector, said air flow being essentially at the constant inlet pressure of the gas turbine system.

  2. Air ejector augmented compressed air energy storage system

    DOE Patents [OSTI]

    Ahrens, F.W.; Kartsounes, G.T.

    Energy is stored in slack demand periods by charging a plurality of underground reservoirs with air to the same peak storage pressure, during peak demand periods throttling the air from one storage reservoir into a gas turbine system at a constant inlet pressure until the air presure in the reservoir falls to said constant inlet pressure, thereupon permitting air in a second reservoir to flow into said gas turbine system while drawing air from the first reservoir through a variable geometry air ejector and adjusting said variable geometry air ejector, said air flow being essentially at the constant inlet pressure of the gas turbine system.

  3. Hanfords Site-Wide Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    commonly called the "site-wide permit") Ecology's role at Hanford * Ensure that Hanford cleanup protects the Columbia River by following state laws to protect our air, land and water * Protect, preserve and enhance the state's environment Why is there a permit? * Hanford made plutonium for nuclear weapons * Hanford created literally millions of tons of waste to deal with "later" * Nation enacted most environmental laws in the 1970s * Hanford regulation begins A Hanford

  4. DEQ Groundwater Permitting Guidebook | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: DEQ Groundwater Permitting GuidebookPermittingRegulatory GuidanceGuide...

  5. Stream Alteration Permits | Open Energy Information

    Open Energy Info (EERE)

    Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Stream Alteration Permits Abstract Stream alteration permits regulate activities that take...

  6. Montana Water Quality Permit Application, Nondegradation Authorization...

    Open Energy Info (EERE)

    Water Quality Permit Application, Nondegradation Authorization, and Permit Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  7. USACE 2012 Nationwide Permits | Open Energy Information

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: USACE 2012 Nationwide PermitsPermittingRegulatory GuidanceSupplemental Material...

  8. Colorado Discharge Permit System General Permit | Open Energy...

    Open Energy Info (EERE)

    to discharge, as of this date, inaccordance with permit requirements and conditions set forth in Parts I and II hereof. All discharges authorized herein shall be consistent with...

  9. Individual Permit for Storm Water

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laws » Individual Permit Individual Permit The Individual Permit authorizes the discharge of storm water associated with historical industrial activities at LANL from specified solid waste management units and areas of concern, collectively referred to as Sites. Canada del Buey Gage station in Mortandad Canyon Pajarito Canyon Sandia Canyon Willows planted for bank stabilization in Pueblo Canyon Willows planted for bank stabilization in Pueblo Canyon What's New Documents submitted to EPRR in

  10. Individual Permit for Storm Water

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    discharges. The Permit establishes target action levels (TALs) that are equivalent to New Mexico State water-quality criteria. These TALs are used as benchmarks to determine the...

  11. Portland's Commercial Solar Permitting Guide

    Broader source: Energy.gov [DOE]

    This program guide outlines the application and review procedures for obtaining the necessary permits to install a solar energy system on a new or existing commercial building.

  12. Sandia Energy - Permitting, Inspection, and Interconnection

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permitting, Inspection, and Interconnection Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Permitting, Inspection, and...

  13. Coordinating Permit Office | OpenEI Community

    Open Energy Info (EERE)

    Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White...

  14. San Francisco's Streamlined Solar Permitting

    Broader source: Energy.gov [DOE]

    San Francisco’s solar permitting process—which allows permits for systems 4 kW and under to be applied for, approved, paid for, and issued online or in person over-the-counter—is one of the most efficient in the nation. This paper describes the process by which the City and County of San Francisco developed and implemented its streamlined solar permitting process, provides an update on San Francisco’s current e-permitting system, and outlines relevant lessons for other jurisdictions undertaking such work. This paper is structured as a resource for other jurisdictions to access best practices in streamlined permitting and learn from San Francisco’s experience.

  15. Wind Access and Permitting Law

    Broader source: Energy.gov [DOE]

    The law also defines a limited set of reasonable restrictions that governments and associations are permitted to use in regulating residential wind energy systems. Any limitations put in place may...

  16. Class 1 Permit Modification Notification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bu il ding 1 Santa Fe, New Mexico 87505-6303 JUL 0 5 2011 Subject: Notification of a Class 1 Permit...

  17. Solar Permitting & Inspection Webinar Series

    Broader source: Energy.gov [DOE]

    ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

  18. Class 1 Permit Modification Notifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Class 1 Permit Modification Notifications Editorial Changes in Monitoring Records Text in Part 1 Editorial Changes in Attachment C6 and Attachment C3 Update Table L-4 and List of Active Environmental Permits Clarify Text Related to Marking and Labeling Packages in Part 3 Clarify Table E-1a Revise Table 4.1.1 Revise Table G-1 Waste Isolation Pilot Plant Carlsbad, New Mexico NM4890139088-TSDF February 2014 Table of Contents Transmittal Letter Table of Contents

  19. PP-16 Alendatory Permit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alendatory Permit PP-16 Alendatory Permit Presidential permit authorizing Alendatory Permit to construct, operate, and maintain electric transmission facilities at the U.S-Mexican border. PP-16 Alendatory Permit (422.88 KB) More Documents & Publications PP-16-1 UNS Electric Inc PP-235-2 Termoelectrica U.S LLC PP-234-1 Baja California Power Inc

  20. Permitting: Lessons from a case study--the U.S. EPA`s Wood Products Enforcement Initiative

    SciTech Connect (OSTI)

    Umberger, N.,

    1995-12-01

    U.S. EPA`s Wood Products Initiative has resulted in the settlement with Louisiana-Pacific (L-P) for over eleven million dollars in fines and much more in expenditures for corporate environmental improvements. EPA claimed that L-P`s corporate environmental structure inadequately addressed the environmental requirements of the Clean Air Act. L-P failed to obtain the necessary permits and provide the permitting authorities with accurate and complete information on air emissions. The author concentrates on the steps companies must follow to ensure that adequate permitting is obtained. The paper states clearly the expectations EPA has of permitting authorities and permit applicants. A checklist of criteria necessary to avoid permitting dilemmas is presented, along with practical advice for environmental managers responsible for permitting and interactions with regulatory authorities. The steps of source identification, emissions quantification, control technology selection, and permit completion are detailed.

  1. The National Solar Permitting Database

    SciTech Connect (OSTI)

    Gunderson, Renic

    2014-08-31

    "The soft costs of solar—costs not associated with hardware—remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  2. The National Solar Permitting Database

    Energy Science and Technology Software Center (OSTI)

    2014-08-31

    "The soft costs of solar—costs not associated with hardware—remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar systemmore » verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."« less

  3. Montana 310 Permit Database | Open Energy Information

    Open Energy Info (EERE)

    0 Permit Database Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana 310 Permit Database Abstract Provides access to Montana's 310 permit mapping...

  4. Washington Environmental Permit Handbook - NPDES Construction...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Washington Environmental Permit Handbook - NPDES Construction Stormwater...

  5. Vermont Waste Transportation Permit and License Information ...

    Open Energy Info (EERE)

    Waste Transportation Permit and License Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont...

  6. Full Permit Application Handbook | Open Energy Information

    Open Energy Info (EERE)

    HandbookLegal Abstract Permit Applicant Hnadbook for Full RCRA Equivalent Hazardous Waste Facility Permits, current through August 7, 2014. Published NA Year Signed or Took...

  7. Washington Environmental Permit Handbook - Dangerous Waste Treatment...

    Open Energy Info (EERE)

    Dangerous Waste Treatment Storage Disposal Facility New Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Washington Environmental Permit Handbook...

  8. Nevada Department of Transportation - Occupancy Permits | Open...

    Open Energy Info (EERE)

    Occupancy Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Department of Transportation - Occupancy Permits Abstract This website gives...

  9. TGLO - Seismic Permitting webpage | Open Energy Information

    Open Energy Info (EERE)

    Permitting webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: TGLO - Seismic Permitting webpage Abstract This is the Texas General Land...

  10. Hawaii Underground Injection Control Permitting Webpage | Open...

    Open Energy Info (EERE)

    Permitting Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Underground Injection Control Permitting Webpage Author State of Hawaii...

  11. Montana Stream Permitting Webpage | Open Energy Information

    Open Energy Info (EERE)

    Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Stream Permitting Webpage Abstract Provides access to Montana Stream Permitting guide....

  12. Permit by Rule Guide | Open Energy Information

    Open Energy Info (EERE)

    Permit by Rule GuideLegal Abstract California Department of Toxic Substance Control Permit by Rule Guide, current through August 7, 2014. Published NA Year Signed or...

  13. California Permit Streamlining Act | Open Energy Information

    Open Energy Info (EERE)

    California Permit Streamlining Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: California Permit Streamlining ActLegal...

  14. SWRCB General NPDES Permits | Open Energy Information

    Open Energy Info (EERE)

    NPDES PermitsLegal Abstract SWRCB General NPDES Permits, current through August 14, 2014. Published NA Year Signed or Took Effect 2014 Legal Citation SWRCB General NPDES...

  15. Caltrans Encroachment Permit Application Guide | Open Energy...

    Open Energy Info (EERE)

    Application GuidePermittingRegulatory GuidanceGuideHandbook Abstract This guide sets forth the application procedure for encroachment permits under Caltrans. Author Caltrans...

  16. Streamlined Permitting Process for Renewable Energy Resources...

    Open Energy Info (EERE)

    Streamlined Permitting Process for Renewable Energy Resources in Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Streamlined Permitting Process...

  17. Hawaii Individual Wastewater Management Permit Packet | Open...

    Open Energy Info (EERE)

    Individual Wastewater Management Permit Packet Citation State of Hawaii Department of Health. 112013. Hawaii Individual Wastewater Management Permit Packet. State of Hawaii....

  18. Coastal Development Permit Application | Open Energy Information

    Open Energy Info (EERE)

    Development Permit Application Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Coastal Development Permit Application Published Publisher Not...

  19. Generic Geophysical Permit | Open Energy Information

    Open Energy Info (EERE)

    Generic Geophysical Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Generic Geophysical Permit Published Publisher Not Provided, Date Not...

  20. Individual Industrial WPFC Permit | Open Energy Information

    Open Energy Info (EERE)

    Individual Industrial WPFC Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Individual Industrial WPFC Permit Published Publisher Not Provided,...

  1. Disclosure of Permitted Communication Concerning Regional Standards...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE-2011-BT-CE-0077 Disclosure of Permitted Communication Concerning Regional Standards ... More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel ...

  2. PIA - Radiological Work Permit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PIA - Radiological Work Permit PDF icon PIA - Radiological Work Permit More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Occupational Medical ...

  3. Caltrans Transportation Permits Manual | Open Energy Information

    Open Energy Info (EERE)

    Transportation Permits Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Caltrans Transportation Permits ManualLegal Abstract...

  4. RAPID/Geothermal/Air Quality | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalAir Quality < RAPID | Geothermal Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal...

  5. RAPID/BulkTransmission/Air Quality | Open Energy Information

    Open Energy Info (EERE)

    BulkTransmissionAir Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  6. New Mexico Guidelines for Public Notification for Air Quality...

    Open Energy Info (EERE)

    Guidelines for Public Notification for Air Quality Permit Applications Jump to: navigation, search OpenEI Reference LibraryAdd to library General: New Mexico Guidelines for Public...

  7. HSWA Part II Permit Modification

    National Nuclear Security Administration (NNSA)

    PART II EPA AUTHORIZATION UNDER THE HAZARDOUS AND SOLID WASTE AMENDMENTS OF 1984 Pursuant to Section 227 of the Hazardous and Solid Waste Amendments of 1984 (hereafter referred to as HSWA"), the United States Environmental Protection Agency (hereafter referred to as "EPA") is granted authority to issue or deny Permits or those portions of Permits affected by the requirements established by HSWA. By this authority and pursuant to Sections 3002(b), 3 004(d), and 3005 of the Resource

  8. WSDE Air Operating Permit Application and Instructions | Open...

    Open Energy Info (EERE)

    Application and InstructionsLegal Published NA Year Signed or Took Effect 2006 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  9. Microsoft Word - DirectPayPermit.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    THIS DIRECT PAY PERMIT APPLIES ONLY TO PURCHASES MADE BY GE GLOBAL RESEARCH

  10. Connecticut Rooftop Solar PV Permitting Guide

    Broader source: Energy.gov [DOE]

    The Connecticut Rooftop Solar PV Permitting Guide is a compilation of best practices and resources for solar PV permitting. The guide includes a summary of current codes and regulations affecting solar PV, best practices for streamlining the municipal permitting process, and tools to assist municipalities in creating a streamlined permit process for residential solar PV. Resources include a solar PV permit application, a structural review worksheet, an inspection checklist, and a model solar zoning ordinance.

  11. Environmental Compliance at the West Valley Demonstration Project: The Vitrification Permitting Program

    SciTech Connect (OSTI)

    L. C. Salvatori; C. B. Banzer; W. T. Watters

    1996-05-28

    The major environmental laws that apply to the West Valley Demonstration Project (WVDP) are the: Resource Conservation and Recovery Act (RCRA), Clean Air Act (CAA), Clean Water Act (CWA), Safe Drinking Water Act (SDWA), Toxic Substances Control Act (TSCA), National Environmental Policy Act (NEPA), and Emergency Planning and Community Right-To-Know Act (EPCRA). Regulations developed in accordance with these laws are administered by the New York State Department of Environmental Conservation (NYSDEC) and the U.S. Environmental Protection Agency (EPA) through state and federal programs, and regulatory requirements such as permitting. The Environmental Permits & Reports (EP&R) Group of the Environmental Affairs (EA) Department has the primary responsibility for developing a site-wide permitting program for the WVDP and obtaining the necessary permits. This report discusses the permits and the permitting process associated with the Vitrification Facility (VF).

  12. Permit Class 3 modification update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ron Skinnarland August 7, 2014 Terms to Know SWOC CAFO Solid Waste Operations Complex, which includes: CWC-WRAP (Central Waste Complex and Waste Receiving and Processing Facility) Low-Level Burial Grounds (LLBG) which includes Trenches 31 and 34, and Trench 94 T-Plant Consent Agreement and Final Order Agreed Order Ecology's enforcement action About the 2013 SWOC Enforcement Actions EPA CAFO- Ecology Agreed Order - Submit permit mods for inactive units Bring the rest of the SWOC units into

  13. HSWA Part II Permit Modification

    National Nuclear Security Administration (NNSA)

    ... Kansas City, Kansas, this 24th day of August , 2012. Final Original signed by John J. Smith for Rebecca Weber Director Air and Waste Management Division August 24, 2012 Date ...

  14. Compressed Air

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lighting Compressed Air ESUE Motors Federal Agriculture Compressed Air Compressed Air Roadmap The Bonneville Power Administration created the roadmap to help utilities find energy...

  15. Storm Water Permits at LANL.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a Storm Water Permit? Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J. Intended for: Public Purpose: This poster was prepared for the May 2011 Individual Permit for Storm Water (IP) public meeting. The purpose of the meeting was to update the public on implementation of the permit as required under Part 1.I (7) of the IP (National Pollutant Discharge Elimination System Permit No. NM0030759). The poster will be available on Los Alamos National

  16. Presidential Permits and Export Authorizations- Frequently Asked Questions

    Office of Energy Efficiency and Renewable Energy (EERE)

    Frequently asked questions about Presidential Permits, Export Authorizations, Self Certifications, and Annual Reports related to permitting.

  17. A review of Title V operating permit application requirements caused by the use of waste-derived fuel at cement plants

    SciTech Connect (OSTI)

    Yarmac, R.F.

    1994-12-31

    The Clean Air Act Amendments of 1990 required the USEPA to establish a comprehensive operating permit program which is being administered by the states. Most major air pollution sources will be required to submit operating permit applications by November 15, 1995 or earlier. Portland cement plants that burn waste-derived fuel face some special permitting problems that need to be addressed during the permit application process. This paper presents a brief summary of the Title V application with special emphasis on the permitting requirements incurred by the utilization of waste fuel at cement plants.

  18. City of Chicago- Green Building Permit Programs

    Broader source: Energy.gov [DOE]

    The Chicago Department of Buildings (DOB) Green Permit Program provides developers and owners with an incentive to build green by streamlining the permit process timeline for projects which are...

  19. NPDES Permit Writers Manual | Open Energy Information

    Open Energy Info (EERE)

    Permit Writers Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: NPDES Permit Writers Manual Abstract This website contains the PDF version of the...

  20. Idaho NPDES Permits Webpage | Open Energy Information

    Open Energy Info (EERE)

    NPDES Permits Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho NPDES Permits Webpage Abstract This webpage provides an overview of the...

  1. HQ Work Control Permit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work ...

  2. 300 area TEDF permit compliance monitoring plan

    SciTech Connect (OSTI)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  3. Multi-Sector General Permit (MSGP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MSGP Multi-Sector General Permit (MSGP) The Multi-Sector General Permit authorizes the discharge of stormwater associated with industrial activity. What's New Documents submitted to EPRR in last 30 Days TBD What is the Multi-Sector General Permit? Storm water discharges from EPA specified industrial activities are regulated under the National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit (MSGP). LANL regulated industrial activities include: Metal fabrication Power

  4. RPP Environmental Permits and Related Documentation

    SciTech Connect (OSTI)

    DEXTER, M.L.

    1999-10-04

    This document contains the current list of environmental permits and related documentation for TWRS facilities and activities.

  5. RPP Environmental Permits and Related Documentation

    SciTech Connect (OSTI)

    DEXTER, M.L.

    2000-11-29

    This document contains the current list of environmental permits and related documentation for TWRS facilities and activities.

  6. RPP Environmental Permits and Related Documentation

    SciTech Connect (OSTI)

    DEXTER, M.L.

    2000-01-17

    This document contains the current list of environmental permits and related documentation for TWRS facilities and activities.

  7. RPP Environmental Permits and Related Documentation

    SciTech Connect (OSTI)

    DEXTER, M.L.

    1999-08-04

    This document contains the current list of environmental permits and related documentation for TWRS facilities and activities.

  8. Montana Construction Dewatering General Permit Application Information...

    Open Energy Info (EERE)

    overview of Construction Dewatering General Permit process. Author Montana Department of Environmental Quality - Water Protection Bureau Published Montana Department of...

  9. WIPP - Information on Proposed Permit Modifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Hazardous Waste Facility Permit RCRA Proposed Permit Modifications (Drafts) Draft Class 3 Permit Modification Request Addition of a Concrete Overpack Container Storage Unit dated August 2016 Fact Sheets Public Notices Please forward comments to the following email address: Draft.ModificationResponse@. These Documents are NOT FINAL and have not been formally submitted to the permitting authority for approval. These Documents are subject to future change at the discretion of the U.S.

  10. WIPP Documents - Hazardous Waste Facility Permit (RCRA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hazardous Waste Facility Permit The WIPP Hazardous Waste Facility Permit (HWFP) effective April 15, 2011 WIPP Hazardous Waste Facility Permit Authorizes the U.S. Department of Energy to manage, store, and dispose of contact-handled and remote-handled transuranic mixed waste at the Waste Isolation Pilot Plant. Mixed waste contains radioactive and chemically hazardous components. Information Repository Documents related to the Hazardous Waste Facility Permit

  11. The collision of Title III and Title V: A potential permitting and enforcement nightmare

    SciTech Connect (OSTI)

    Facca, G.; Faler, M.

    1998-12-31

    The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

  12. California Solar Permitting Guidebook, Second Edition

    Office of Energy Efficiency and Renewable Energy (EERE)

    The California Solar Permitting Guidebook is a resource for local governments and permitting agencies to facilitate installation of small solar energy systems. By adopting its recommendations, local governments can reduce permit processing times and increase their output while facilitating local economic development.

  13. Solar Photovoltaic (PV) System Permit Application Checklist

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Permit Application Checklist is intended to be used as a best management practice when establishing local government requirements for residential and commercial solar photovoltaic (PV) system permits. Local governments may modify this checklist to accommodate their local ordinances, code requirements, and permit procedures.

  14. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  15. Annual Hanford Site Environmental Permitting Status Report

    SciTech Connect (OSTI)

    HOMAN, N.A.

    2000-10-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  16. Strong interactions in air showers

    SciTech Connect (OSTI)

    Dietrich, Dennis D.

    2015-03-02

    We study the role new gauge interactions in extensions of the standard model play in air showers initiated by ultrahigh-energy cosmic rays. Hadron-hadron events remain dominated by quantum chromodynamics, while projectiles and/or targets from beyond the standard model permit us to see qualitative differences arising due to the new interactions.

  17. Application for Permit to Construct Access Driveway Facilities...

    Open Energy Info (EERE)

    Permit to Construct Access Driveway Facilities on Highway ROW Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit...

  18. Wetland Permit Application Fees 2015 | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Wetland Permit Application Fees 2015PermittingRegulatory GuidanceGuide...

  19. Alaska Public Participation in APDES Permitting Process | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Alaska Public Participation in APDES Permitting ProcessPermittingRegulatory...

  20. Guide to Permitting Electric Transmission Lines in Wyoming |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Guide to Permitting Electric Transmission Lines in WyomingPermitting...

  1. Hazardous Waste Generator Treatment Permit by Rule | Open Energy...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Hazardous Waste Generator Treatment Permit by RulePermittingRegulatory GuidanceGuideHandbook...

  2. AZPDES General Permit for Stormwater Discharges Associated with...

    Open Energy Info (EERE)

    OtherOther: AZPDES General Permit for Stormwater Discharges Associated with Construction Activity (Permit No. AZG2013-001)Legal Abstract This Construction General Permit governs...

  3. Category:RAPID State Permitting Properties | Open Energy Information

    Open Energy Info (EERE)

    RAPID State Permitting Properties Jump to: navigation, search These properties are used by the RAPID toolkit state level permitting forms. Pages in category "RAPID State Permitting...

  4. Application Submittal Guidance for Stormwater Permits andPost...

    Open Energy Info (EERE)

    Post-Authorization Stormwater Permit CorrespondencePermittingRegulatory GuidanceGuideHandbook Abstract Application Submittal Guidance for Stormwater Permits and...

  5. Vermont Agency of Transportation Highway Permit Application Informatio...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont Agency of Transportation Highway Permit Application InformationPermitting...

  6. Hawaii Underground Injection Control Permit Packet | Open Energy...

    Open Energy Info (EERE)

    PermittingRegulatory Guidance - Supplemental Material: Hawaii Underground Injection Control Permit PacketPermittingRegulatory GuidanceSupplemental Material Author State of...

  7. Application for Nonpurposeful Eagle Take Permit | Open Energy...

    Open Energy Info (EERE)

    Eagle Take Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Application for Nonpurposeful...

  8. Hawaii Clean Energy Initiative - Transmission Line Approval Permit...

    Open Energy Info (EERE)

    Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Hawaii Clean Energy Initiative - Transmission Line Approval Permit PacketPermittingRegulatory...

  9. Hawaii Clean Energy Iniative Use and Occupancy Permit | Open...

    Open Energy Info (EERE)

    Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Hawaii Clean Energy Iniative Use and Occupancy PermitPermittingRegulatory GuidanceInstructions...

  10. Vermont Permit and License Information: NPDES Stormwater General...

    Open Energy Info (EERE)

    General Permits for Construction SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for...

  11. Montana Sand and Gravel Operations General Permit - Example Authorizat...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Montana Sand and Gravel Operations General Permit - Example AuthorizationPermitting...

  12. Santa Fe Oversize/Overweight Permit Application | Open Energy...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Santa Fe OversizeOverweight Permit ApplicationLegal Published NA Year Signed or Took...

  13. Lake Encroachment Permit Application, Abutting Land Owner Addendum...

    Open Energy Info (EERE)

    Lake Encroachment Permit Application, Abutting Land Owner Addendum Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit...

  14. NDOT Over Dimensional Permits Instruction 1-08 | Open Energy...

    Open Energy Info (EERE)

    library PermittingRegulatory Guidance - Instructions: NDOT Over Dimensional Permits Instruction 1-08PermittingRegulatory GuidanceInstructions Abstract The purpose of this...

  15. NDOT Over Dimensional Permits Instruction 6-07 | Open Energy...

    Open Energy Info (EERE)

    library PermittingRegulatory Guidance - Instructions: NDOT Over Dimensional Permits Instruction 6-07PermittingRegulatory GuidanceInstructions Abstract The purpose of this...

  16. Air Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Quality Air Quality Tour The Laboratory calculates the dose to the maximally exposed individual (MEI) to determine effects of Laboratory operations on the public. Open full...

  17. Air Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Quality Air Quality Tour The Laboratory calculates the dose to the maximally exposed individual (MEI) to determine effects of Laboratory operations on the public.

  18. Air Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Quality Air Quality Tour The Laboratory calculates the dose to the maximally exposed individual (MEI) to determine effects of Laboratory operations on the public.

  19. Presidential Permits - Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permits - Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with the public interest. The two criteria used by DOE to determine if a proposed project is consistent with the public interest are: Environmental Impact - The National Environmental Policy Act of 1969 (NEPA) requires that Federal agencies give due consideration to the environmental consequences of their actions. Pursuant

  20. Montana Produced Water General Permit - Example Authorization...

    Open Energy Info (EERE)

    General Permit. Author Montana Department of Environmental Quality - Water Protection Bureau Published State of Montana, 052010 DOI Not Provided Check for DOI availability:...

  1. Montana Construction Dewatering General Permit - Example Authorization...

    Open Energy Info (EERE)

    General Permit. Author Montana Department of Environmental Quality - Water Protection Bureau Published State of montana, 92010 DOI Not Provided Check for DOI availability: http:...

  2. BLM - Paleontological Resources Use Permit Application | Open...

    Open Energy Info (EERE)

    Notice Form Topic Paleontological Resources Use Permit Application Organization Bureau of Land Management Published Publisher Not Provided, 1994 DOI Not Provided Check for...

  3. Colorado - Access Permit Application File Review Checklist |...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Colorado - Access Permit Application File Review Checklist Author Colorado Department of Transportation...

  4. NPDES Permit Program Website | Open Energy Information

    Open Energy Info (EERE)

    basic information on the major features and elements of the NPDES permit program. Author Environmental Protection Agency Published Publisher Not Provided, Date Not Provided DOI...

  5. Multi-Sector General Permit (MSGP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General Permit authorizes the discharge of stormwater associated with industrial activity. What's New Documents submitted to EPRR in last 30 Days TBD What is the...

  6. NDOT - Application Information for Evaluating Annual Permit ...

    Open Energy Info (EERE)

    - Application Information for Evaluating Annual Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: NDOT - Application Information for Evaluating Annual...

  7. Montana - Encroachment Permit Application | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Montana - Encroachment Permit Application Author Montana Department of Transportation...

  8. WPCF Underground Injection Control Disposal Permit Evaluation...

    Open Energy Info (EERE)

    WPCF Underground Injection Control Disposal Permit Evaluation and Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: WPCF Underground Injection...

  9. Washington Environmental Permit Handbook - Underground Injection...

    Open Energy Info (EERE)

    Underground Injection Control Registration webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Washington Environmental Permit Handbook -...

  10. Oregon Water Quality Permit Program (Stormwater - Industrial...

    Open Energy Info (EERE)

    Activities) Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Water Quality Permit Program (Stormwater - Industrial Activities) Website...

  11. NMSL General Archaeological Investigation Permit Applicatoin...

    Open Energy Info (EERE)

    Permit ApplicatoinLegal Published NA Year Signed or Took Effect 2006 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org...

  12. Standardized Permit Guidance | Open Energy Information

    Open Energy Info (EERE)

    current through August 7, 2014. Published NA Year Signed or Took Effect 2006 Legal Citation Standardized Permit Guidance (2006) DOI Not Provided Check for DOI availability:...

  13. Colorado Construction Dewatering General Permit | Open Energy...

    Open Energy Info (EERE)

    Colorado Construction Dewatering General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Colorado Construction Dewatering...

  14. Groundwater Withdrawal Permit Application | Open Energy Information

    Open Energy Info (EERE)

    Withdrawal Permit ApplicationLegal Abstract This application initiates the Drinking Water and Groundwater Protection Division's, a division of the Department of Environmental...

  15. Catawba County- Green Construction Permitting Incentive Program

    Broader source: Energy.gov [DOE]

    Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

  16. Los Alamos National Laboratory Environmental Permits Update

    Broader source: Energy.gov [DOE]

    At the January 29, 2014 Board meeting Tony Grieggs LANL, Provided Information on the Environmental Permit Status and the LANL Sites that they Cover.

  17. California Geothermal Permitting Guide | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: California Geothermal Permitting Guide Abstract The Public Interest Energy Research (PIER) Program...

  18. Arizona Department of Environmental Quality's Individual Permits...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Arizona Department of Environmental Quality's Individual Permits Website Abstract This website contains information...

  19. Arizona Department of Environmental Quality's General Permits...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Arizona Department of Environmental Quality's General Permits Website Abstract This website provides information...

  20. WSDE Nationwide Permit webpage | Open Energy Information

    Open Energy Info (EERE)

    Ecology, 2012 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for WSDE Nationwide Permit webpage Citation Washington State Department of...

  1. Washington Environmental Permit Handbook - Geothermal Drilling...

    Open Energy Info (EERE)

    PermitLegal Abstract The State of Washington Governor's Office for Regulatory Innovation and Assistance provides a FAQs resource for developers. Published NA Year Signed or...

  2. NDMV - Longer Combination Vehicle (LCV) Permit Application |...

    Open Energy Info (EERE)

    Vehicle (LCV) Permit Application Abstract This form is the Nevada Department of Motor Vehicles LCV Application. Form Type ApplicationNotice Form Topic Longer Combination...

  3. Source Water and Groundwater Withdrawal Permit Application Process...

    Open Energy Info (EERE)

    Permit Application Process Guidance Citation Vermont Department of Environmental Conservation. 2015. Source Water and Groundwater Withdrawal Permit Application Process...

  4. Preparing for the clean air act amendments

    SciTech Connect (OSTI)

    Boomer, B.; Bensinger, D. Midwest Research Inst., Cary, NC )

    1993-09-09

    The U.S. Environmental Protection Agency (EPA) and state air quality control agencies are in the midst of developing regulations and programs to meet the ambitious goals of the Clean Air Act Amendment (CAAA) of 1990. The CAAA--which call for stricter air quality standards, a greater number of pollutants and sources to be regulated, new operating permits, and more stringent enforcement of air quality violations--are expected to have a significant impact on virtually every facility in the country. An important deadline in the implementation of the CAAA is November 1993. That is when individual states must submit their proposed operating permit programs to the EPA, as mandated by Title 5 of the Amendments. The EPA then has one year after receiving a state program to accept or reject it. Once a state's program is accepted, all major sources of air pollution in that state have one year to apply for an operating air permit. Although the initial deadlines for business and industry are up to two years away, sufficient information is now available to take the first steps toward compliance with the new air quality regulations. Even while the details of the new rules are being hammered out, plant engineering can and should begin laying the groundwork for their own permit applications. Time and effort spent preparing now for the provisions of the CAAA will pay off in the long run.

  5. Air Sealing

    SciTech Connect (OSTI)

    2000-02-01

    This fact sheet describes ventilation and the importance of sealing air leaks and providing controlled ventilation.

  6. MCA 75-5-401 - Water Quality Permits: Board Rules for Permits...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: MCA 75-5-401 - Water Quality Permits: Board Rules for PermitsLegal Abstract Sets forth board...

  7. Major developments in section 404-permitting

    SciTech Connect (OSTI)

    Ahrens, M.; Orr, S.

    2009-06-15

    Mountain coal mining in the Central Appalachians faces increased challenge under the Clean Water Act (CWA). These challenges have included the US Environmental Protection Agency's (EPA) increased involvement in permitting under Section 404 of the CWA; active opposition by environmental groups to Section 404 permits; and proposed federal legislation to reduce the availability of these permits. These recent challenges culminated in a June 11, 2009, Memorandum of Understanding (MoU) between the PEA, the Department of Interior (DoI) and the Army Corps of Engineers (Corps) that will limit the use of general permits for mountaintop coal mining and increase the scrutiny applied to individual permits, while also providing a coordinated approach for reviewing the backlog of pending permit application. By entering into the MoU, the federal agencies aim to reduce the environmental impacts of mountaintop coal mining while increasing certainty and transparency for permit applications. Challenges to Section 404 permitting for mountaintop coal mining are dynamic and new developments occur almost daily. This article provides a snapshot of the current climate.

  8. Solar PV Permitting and Safety Training Webinar

    Broader source: Energy.gov [DOE]

    This webinar provides training on two permitting resources for municipal inspectors; a prescriptive process for building inspectors and a guidance document for permitting for PV for electrical inspectors. The webinar also runs through a number of key code articles in Massachusetts 2014 electrical code and examines a variety of safety hazards commonly found during or after solar PV installations.

  9. Clean Air Act Title V: Knocking on your door

    SciTech Connect (OSTI)

    Hosford, R.B. )

    1993-01-15

    The Clean Air Act Amendments of 1990 made several significant changes in the clean air program. One of the key elements of the Amendments was the inclusion of an operating permit program in Title V. The purpose of the program is to establish a central point for tracking all applicable air quality requirements for every source required to obtain a permit. This article provides a brief description of the most significant provisions. In addition, the subject of permit modification is discussed in some detail.

  10. Hot air drum evaporator

    DOE Patents [OSTI]

    Black, Roger L.

    1981-01-01

    An evaporation system for aqueous radioactive waste uses standard 30 and 55 gallon drums. Waste solutions form cascading water sprays as they pass over a number of trays arranged in a vertical stack within a drum. Hot dry air is circulated radially of the drum through the water sprays thereby removing water vapor. The system is encased in concrete to prevent exposure to radioactivity. The use of standard 30 and 55 gallon drums permits an inexpensive compact modular design that is readily disposable, thus eliminating maintenance and radiation build-up problems encountered with conventional evaporation systems.

  11. Method for reducing fuel cell output voltage to permit low power operation

    DOE Patents [OSTI]

    Reiser, Carl A.; Landau, Michael B.

    1980-01-01

    Fuel cell performance is degraded by recycling a portion of the cathode exhaust through the cells and, if necessary, also reducing the total air flow to the cells for the purpose of permitting operation below a power level which would otherwise result in excessive voltage.

  12. Air Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Heat & Cool » Home Cooling Systems » Air Conditioning Air Conditioning Air conditioners cost U.S. homeowners more than $11 billion each year, and regular maintenance can keep your air conditioner running efficiently. | Photo courtesy of ©iStockphoto/JaniceRichard Air conditioners cost U.S. homeowners more than $11 billion each year, and regular maintenance can keep your air conditioner running efficiently. | Photo courtesy of ©iStockphoto/JaniceRichard Two-thirds of all homes in the

  13. WIPP Hazardous Waste Permit - Approved Modifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Solid Waste Management Units and Areas of Concern - August 2007 Final Class 1 WTS Mgr Change 9-05-07 Class 1 Permit Notifications final 9-12-07 Class 2 Monitoring Filled...

  14. NMED - Discharge Permit Application | Open Energy Information

    Open Energy Info (EERE)

    Discharge Permit ApplicationLegal Published NA Year Signed or Took Effect 2014 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  15. Washington Joint Aquatic Resources Permit Application | Open...

    Open Energy Info (EERE)

    Resources Permit ApplicationLegal Published NA Year Signed or Took Effect 2012 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  16. City of Chicago- Solar Express Permit Program

    Broader source: Energy.gov [DOE]

    In 2013, the City of Chicago streamlined and standardized the permitting and zoning process for rooftop solar photovoltaic (PV) systems. Small and large rooftop PV generators can now access the...

  17. Distributed PV Permitting and Inspection Processes

    SciTech Connect (OSTI)

    Solar Energy Technologies Office

    2010-08-03

    This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

  18. City of Asheville- Building Permit Fee Rebates

    Broader source: Energy.gov [DOE]

    The City of Asheville offers rebates for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

  19. PARKING KEY: State Handicap Medically Permitted

    National Nuclear Security Administration (NNSA)

    PARKING KEY: State Handicap Medically Permitted Preferred (LEED) Visitor Motorcycle New Parking Spots / Parallel Parking NATIONAL SECURITY CAMPUS The DOE's National Security Campus is managed and operated by Honeywell. REVISED: August 2014

  20. Distributed PV Permitting and Inspection Processes

    Broader source: Energy.gov [DOE]

    This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

  1. RCRA post-closure permits. RCRA Information Brief

    SciTech Connect (OSTI)

    Coalgate, J.

    1993-02-01

    The Resource Conservation and Recovery Act (RCRA) requires that hazardous waste management facilities operate in accordance with permits granted by the US Environmental Protection Agency (EPA) or a State authorized to carry out the RCRA Subtitle C program. Several categories of permits, including treatment,storage, and disposal permits; research, development and demonstration permits; post-closure permits; emergency permits; permits-by-rule; and trial burn and land treatment demonstration permits are issued under the RCRA Subtitle C program. This Information Brief focuses on post-closure permitting requirements under 40 CFR 270.1(c).

  2. Air filter

    SciTech Connect (OSTI)

    Jackson, R.E.; Sparks, J.E.

    1981-03-03

    An air filter is described that has a counter rotating drum, i.e., the rotation of the drum is opposite the tangential intake of air. The intake air has about 1 lb of rock wool fibers per 107 cu. ft. of air sometimes at about 100% relative humidity. The fibers are doffed from the drum by suction nozzle which are adjacent to the drum at the bottom of the filter housing. The drum screen is cleaned by periodically jetting hot dry air at 120 psig through the screen into the suction nozzles.

  3. Protective supplied breathing air garment

    DOE Patents [OSTI]

    Childers, Edward L.; von Hortenau, Erik F.

    1984-07-10

    A breathing air garment for isolating a wearer from hostile environments containing toxins or irritants includes a suit and a separate head protective enclosure or hood engaging a suit collar in sealing attachment. The hood and suit collar are cylindrically shaped and dimensioned to enable the wearer to withdraw his hands from the suit sleeves to perform manual tasks within the hood interior. Breathing air is supplied from an external air line with an air delivery hose attached to the hood interior. The hose feeds air into an annular halo-like fiber-filled plenum having spaced discharge orifices attached to the hood top wall. A plurality of air exhaust/check valves located at the suit extremities cooperate with the hood air delivery system to provide a cooling flow of circulating air from the hood throughout the suit interior. A suit entry seal provided on the suit rear torso panel permits access into the suit and is sealed with an adhesive sealing flap.

  4. Protective supplied breathing air garment

    DOE Patents [OSTI]

    Childers, E.L.; Hortenau, E.F. von.

    1984-07-10

    A breathing air garment is disclosed for isolating a wearer from hostile environments containing toxins or irritants includes a suit and a separate head protective enclosure or hood engaging a suit collar in sealing attachment. The hood and suit collar are cylindrically shaped and dimensioned to enable the wearer to withdraw his hands from the suit sleeves to perform manual tasks within the hood interior. Breathing air is supplied from an external air line with an air delivery hose attached to the hood interior. The hose feeds air into an annular halo-like fiber-filled plenum having spaced discharge orifices attached to the hood top wall. A plurality of air exhaust/check valves located at the suit extremities cooperate with the hood air delivery system to provide a cooling flow of circulating air from the hood throughout the suit interior. A suit entry seal provided on the suit rear torso panel permits access into the suit and is sealed with an adhesive sealing flap. 17 figs.

  5. Application for Presidential Permit OE Docket No. PP-394 Emera...

    Office of Environmental Management (EM)

    Maine Application for Presidential Permit OE Docket No. PP-394 Emera Maine Application to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under ...

  6. Application for Presidential Permit OE Docket No. PP-397 Emera...

    Office of Environmental Management (EM)

    Maine Application for Presidential Permit OE Docket No. PP-397 Emera Maine Application to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under ...

  7. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect (OSTI)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  8. ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2007 Legal Citation ARM...

  9. ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

  10. Draft Advice for the Hanford Facility Dangerous Waste Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue Managers Working Draft Page 1 of 19 Draft Advice for the Hanford Facility Dangerous Waste Permit (Site-Wide Permit) Background: The Draft Hanford Facility Dangerous Waste Permit for the Treatment, Storage, and Disposal of Dangerous Waste (Permit) is the Washington State Department of Ecology's (Ecology) tool for regulating hazardous waste at Hanford. The Permit(s) establish conditions that the U.S. Department of Energy (DOE) and its contractors must meet to protect human health and the