National Library of Energy BETA

Sample records for air conditioning contractors

  1. Better Buildings Neighborhood Program Business Models Guide: Contractor/Retailer Business Models

    Broader source: Energy.gov [DOE]

    Business models information focused on remodelers, HVAC (heating, ventilation, and air conditioning) contractors, home performance contractors, or retailers.

  2. CONTRACTOR:

    Office of Legacy Management (LM)

    CONTRACTOR: o// -s- - ' ; &.: 5: "I *. ' .,_ ' This document consists of 13 pages. No. 6 of 11 copies,Series A , CONTRACT NO. AT(30-1)-696 7-m: HORIZONS INCORPORATED Princeton, New Jersey CONTRACT FOR: RESEARCHANDDEVEIWMENT COMMISSION OBLIGATION: * $9140.80 PAYMEXT: To be made by Division of Disbursement, United States Treasury Department, New York, N. Y. (Submit Invoices to: United States Atomic Energy Commission, P.O. Box 30, Ansonia Station, New York 23, New York . ,Ik i-' p.ec / 4

  3. Air Sealing: A Guide for Contractors to Share with Homeowners Volume 10

    SciTech Connect (OSTI)

    Pacific Northwest National Laboratory

    2010-04-12

    This guide provides information to contractors and homeowners to identify ways to seal unwanted air leaks in homes, while ensuring healthy levels of ventilation and avoiding indoor air pollution.

  4. History of Air Conditioning

    Broader source: Energy.gov [DOE]

    We take it for granted but what would life be like without the air conditioner? Once considered a luxury, this invention is now an essential, allowing us to cool everything from homes, businesses, businesses, data centers, laboratories and other buildings vital to our daily lives. Explore this timeline to learn some of the key dates in the history of air conditioning.

  5. Membrane Based Air Conditioning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Membrane Based Air Conditioning 2016 Building Technologies Office Peer Review Brian Johnson, brian.johnson@daisanalytic.com Dais Analytic Corporation INSERT PROJECT SPECIFIC PHOTO (replacing this shape) 2 Project Summary Timeline: Start date: October 1, 2015 NEW PROJECT Planned end date: September 30, 2017 Key Milestones 1. System Design Review; March 2016 2. Compressor testing review; September 2016 3. Go/No-Go based on bench testing; September 2016 4. Experimental evaluation of V1 prototype;

  6. Air conditioning apparatus

    SciTech Connect (OSTI)

    Ouchi, Y.; Otoshi, Sh.

    1985-04-09

    The air conditioning apparatus according to the invention comprises an absorption type heat pump comprising a system including an absorber, a regenerator, a condenser and an evaporator. A mixture of lithium bromide and zinc chloride is used as an absorbent which is dissolved to form an absorbent solution into a mixed solvent having a ratio by weight of methanol to water, the ratio falling in a range between 0.1 and 0.3. Said solution is circulated through the system.

  7. High Energy Efficiency Air Conditioning

    SciTech Connect (OSTI)

    Edward McCullough; Patrick Dhooge; Jonathan Nimitz

    2003-12-31

    This project determined the performance of a new high efficiency refrigerant, Ikon B, in a residential air conditioner designed to use R-22. The refrigerant R-22, used in residential and small commercial air conditioners, is being phased out of production in developed countries beginning this year because of concerns regarding its ozone depletion potential. Although a replacement refrigerant, R-410A, is available, it operates at much higher pressure than R-22 and requires new equipment. R-22 air conditioners will continue to be in use for many years to come. Air conditioning is a large part of expensive summer peak power use in many parts of the U.S. Previous testing and computer simulations of Ikon B indicated that it would have 20 - 25% higher coefficient of performance (COP, the amount of cooling obtained per energy used) than R-22 in an air-cooled air conditioner. In this project, a typical new R-22 residential air conditioner was obtained, installed in a large environmental chamber, instrumented, and run both with its original charge of R-22 and then with Ikon B. In the environmental chamber, controlled temperature and humidity could be maintained to obtain repeatable and comparable energy use results. Tests with Ikon B included runs with and without a power controller, and an extended run for several months with subsequent analyses to check compatibility of Ikon B with the air conditioner materials and lubricant. Baseline energy use of the air conditioner with its original R-22 charge was measured at 90 deg F and 100 deg F. After changeover to Ikon B and a larger expansion orifice, energy use was measured at 90 deg F and 100 deg F. Ikon B proved to have about 19% higher COP at 90 deg F and about 26% higher COP at 100 deg F versus R-22. Ikon B had about 20% lower cooling capacity at 90 deg F and about 17% lower cooling capacity at 100 deg F versus R-22 in this system. All results over multiple runs were within 1% relative standard deviation (RSD). All of these

  8. Building America Best Practices Series, Vol. 10- Retrofit Techniques & Technologies: Air Sealing, A Guide for Contractors to Share with Homeowners

    Office of Energy Efficiency and Renewable Energy (EERE)

    This guide provides information to contractors and homeowners to identify ways to seal unwanted air leaks in homes, while ensuring healthy levels of ventilation and avoiding indoor air pollution.

  9. Air Conditioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heat & Cool » Home Cooling Systems » Air Conditioning Air Conditioning Air conditioners cost U.S. homeowners more than $11 billion each year, and regular maintenance can keep your air conditioner running efficiently. | Photo courtesy of ©iStockphoto/JaniceRichard Air conditioners cost U.S. homeowners more than $11 billion each year, and regular maintenance can keep your air conditioner running efficiently. | Photo courtesy of ©iStockphoto/JaniceRichard Two-thirds of all homes in the

  10. Air conditioning system

    DOE Patents [OSTI]

    Lowenstein, Andrew; Miller, Jeffrey; Gruendeman, Peter; DaSilva, Michael

    2005-02-01

    An air conditioner comprises a plurality of plates arranged in a successively stacked configuration with portions thereof having a spaced apart arrangement, and defining between successive adjacent pairs of plates at the spaced apart portions a first and second series of discrete alternating passages wherein a first air stream is passed through the first series of passages and a second air stream is passed through the second series of passages; and said stacked configuration of plates forming integrally therewith a liquid delivery means for delivering from a source a sufficient quantity of a liquid to the inside surfaces of the first series of fluid passages in a manner which provides a continuous flow of the liquid from a first end to a second end of the plurality of plates while in contact with the first air stream.

  11. Central Air Conditioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Central Air Conditioning Central Air Conditioning Central air conditioners circulate cool air through a system of supply and return ducts. | Photo courtesy of ©iStockphoto/DonNichols. Central air conditioners circulate cool air through a system of supply and return ducts. | Photo courtesy of ©iStockphoto/DonNichols. Central air conditioners circulate cool air through a system of supply and return ducts. Supply ducts and registers (i.e., openings in the walls, floors, or ceilings covered by

  12. Air-Conditioning Basics | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Air-Conditioning Basics Air-Conditioning Basics August 16, 2013 - 1:59pm Addthis Air conditioning is one of the most common ways to cool homes and buildings. How Air Conditioners Work Air conditioners employ the same operating principles and basic components as refrigerators. Refrigerators use energy (usually electricity) to transfer heat from the cool interior of the refrigerator to the relatively warm surroundings; likewise, an air conditioner uses energy to transfer heat from the interior

  13. Lab Breakthrough: Desiccant Enhanced Evaporative Air Conditioning |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Desiccant Enhanced Evaporative Air Conditioning Lab Breakthrough: Desiccant Enhanced Evaporative Air Conditioning May 29, 2012 - 5:22pm Addthis This breakthrough combines desiccant materials, which remove moisture from the air using heat, and advanced evaporative technologies to develop a cooling unit that uses 90 percent less electricity and up to 80 percent less total energy than traditional air conditioning. This solution, called the desiccant enhanced evaporative air

  14. Heating Ventilation and Air Conditioning Efficiency

    Broader source: Energy.gov [DOE]

    This presentation covers common pitfalls that lead to wasted energy in industrial heating ventilation and air conditioning (HVAC) systems.

  15. History of Air Conditioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History of Air Conditioning History of Air Conditioning July 20, 2015 - 3:15pm Addthis Paul Lester Paul Lester Digital Content Specialist, Office of Public Affairs MORE ON AIR CONDITIONING Check out our Energy Saver 101 infographic to learn how air conditioners work. Go to Energy Saver for more tips and advice on home cooling. Stay up-to-date on how the Energy Department is working to improve air conditioning technology. We take the air conditioner for granted, but imagine what life would be

  16. Air Conditioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    An air conditioner cools your home with a cold indoor coil called the evaporator. The condenser, a hot outdoor coil, releases the collected heat outside. The evaporator and ...

  17. Heating, Ventilation and Air Conditioning Efficiency

    Energy Savers [EERE]

    Typical Design Conditions 75 degrees F temperature 50% relative humidity 30 - 50 FPM air movement 15 - 20 CFM outside air per person or CO2 less than 1,000 PPM ASHRAE 62 - 1989 ...

  18. History of Air Conditioning | Department of Energy

    Energy Savers [EERE]

    Efficiency Standards Drive Improvements As air conditioning use soared in the 1970s, the energy crisis hit. In response, lawmakers passed laws to reduce energy consumption across...

  19. Breakthrough Video: Desiccant Enhanced Evaporative Air Conditioning

    SciTech Connect (OSTI)

    2012-01-01

    Researchers at the National Renewable Energy Laboratory (NREL) invented a breakthrough technology that improves air conditioning in a novel way—with heat. NREL combined desiccant materials, which remove moisture from the air using heat, and advanced evaporative technologies to develop a cooling unit that uses 90% less electricity and up to 80% less total energy than traditional air conditioning (AC). This solution, called the desiccant enhanced evaporative air conditioner (DEVAP), also controls humidity more effectively to improve the comfort of people in buildings.

  20. Membrane Based Air Conditioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Membrane Based Air Conditioning Membrane Based Air Conditioning Image courtesy of Dais Analytic Corporation and BTO Peer Review. Image courtesy of Dais Analytic Corporation and BTO Peer Review. Lead Performer: Dais Analytic Corporation - Odessa, FL Partners: -- Oak Ridge National Laboratory - Oak Ridge, TN -- Xergy Inc. - Seaford, DE DOE Total Funding: $1,500,000 Cost Share: $300,000 Project Term: October 1, 2015 - September 30, 2016 Funding Opportunity: Building Energy Efficiency Frontiers and

  1. Retrofitting Inefficient Rooftop Air-Conditioning Units Reduces...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Retrofitting Inefficient Rooftop Air-Conditioning Units Reduces U.S. Navy Energy Use As ... One such technology- retrofitting rooftop air- conditioning units with an advanced rooftop ...

  2. American Society of Heating, Refrigeration, and Air Condition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    American Society of Heating, Refrigeration, and Air Condition Engineers (ASHRAE) 2016 Annual Conference American Society of Heating, Refrigeration, and Air Condition Engineers ...

  3. HEATING, AIR-CONDITIONING AND REFRIGERATION DISTRIBUTORS INTERNATIONAL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HEATING, AIR-CONDITIONING AND REFRIGERATION DISTRIBUTORS INTERNATIONAL (HARDI) HEATING, AIR-CONDITIONING AND REFRIGERATION DISTRIBUTORS INTERNATIONAL (HARDI) OE Framework Document ...

  4. 2016 American Society of Heating, Refrigerating, and Air-Conditioning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2016 American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Winter Conference 2016 American Society of Heating, Refrigerating, and Air-Conditioning...

  5. Seminar 14 - Desiccant Enhanced Air Conditioning: Desiccant Enhanced Evaporative Air Conditioning (Presentation)

    SciTech Connect (OSTI)

    Kozubal, E.

    2013-02-01

    This presentation explains how liquid desiccant based coupled with an indirect evaporative cooler can efficiently produce cool, dry air, and how a liquid desiccant membrane air conditioner can efficiently provide cooling and dehumidification without the carryover problems of previous generations of liquid desiccant systems. It provides an overview to a liquid desiccant DX air conditioner that can efficiently provide cooling and dehumidification to high latent loads without the need for reheat, explains how liquid desiccant cooling and dehumidification systems can outperform vapor compression based air conditioning systems in hot and humid climates, explains how liquid desiccant cooling and dehumidification systems work, and describes a refrigerant free liquid desiccant based cooling system.

  6. Aggregated Modeling and Control of Air Conditioning Loads for...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Aggregated Modeling and Control of Air Conditioning Loads for Demand Response Citation Details In-Document Search Title: Aggregated Modeling and Control of Air...

  7. Alternative non-CFC mobile air conditioning

    SciTech Connect (OSTI)

    Mei, V.C.; Chen, F.C.; Kyle, D.M.

    1992-09-01

    Concern about the destruction of the global environment by chlorofluorocarbon (CFC) fluids has become an impetus in the search for alternative, non-CFC refrigerants and cooling methods for mobile air conditioning (MAC). While some alternative refrigerants have been identified, they are not considered a lasting solution because of their high global warming potential, which could result in their eventual phaseout. In view of this dilemma, environmentally acceptable alternative cooling methods have become important. This report, therefore, is aimed mainly at the study of alternative automotive cooling methodologies, although it briefly discusses the current status of alternative refrigerants. The alternative MACs can be divided into work-actuated and heat-actuated systems. Work-actuated systems include conventional MAC, reversed Brayton air cycle, rotary vane compressor air cycle, Stirling cycle, thermoelectric (TE) cooling, etc. Heat-actuated MACs include metal hydride cooling, adsorption cooling, ejector cooling, absorption cycle, etc. While we are better experienced with some work-actuated cycle systems, heat-actuated cycle systems have a high potential for energy savings with possible waste heat applications. In this study, each altemative cooling method is discussed for its advantages and its limits.

  8. Central Air Conditioning | Department of Energy

    Office of Environmental Management (EM)

    Air supply and return ducts come from indoors through the home's exterior wall or roof to connect with the packaged air conditioner, which is usually located outdoors....

  9. The Future of Air Conditioning for Buildings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2016 W. Goetzler, M. Guernsey, J. Young, J. Fuhrman Navigant Consulting, Inc. O. Abdelaziz, PhD Oak Ridge National Laboratory (This page intentionally left blank) NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal

  10. Better Buildings Neighborhood Program Business Models Guide: Contractor/Retailer Description

    Broader source: Energy.gov [DOE]

    The home improvement market includes a range of private-sector entities that currently provide or could offer home energy upgrade services. Most of these entities are remodelers, HVAC (heating, ventilation, and air conditioning) contractors, home performance contractors, or retailers; other actors are present in the sector (such as window installers and insulators), but this analysis focuses on these four main categories.

  11. Solar Installation Contractor

    Broader source: Energy.gov [DOE]

    Alternate Title(s):General Contractor, Electrical or Plumbing Contractor, Construction Manager, Project Superintendant

  12. Central Air Conditioning | Department of Energy

    Energy Savers [EERE]

    that the newly installed air conditioner has the exact refrigerant charge and airflow rate specified by the manufacturer Locates the thermostat away from heat sources, such as...

  13. Air Conditioning Heating and Refrigeration Institute Comment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Air Conditioning Heating and Refrigeration Institute Comment Air Conditioning Heating and Refrigeration Institute Comment These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the July 3, 2014 Federal Register requesting information to assist DOE in reviewing existing regulations and in making its regulatory program more effective and less burdensome. DOE Reg Burden RFI

  14. Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Burden RFI | Department of Energy Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the August 8, 2012 Federal Register requesting information to assist DOE in reviewing existing regulations and in making its

  15. Air-conditioning, Heating, and Refrigeration Institute Comments |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Air-conditioning, Heating, and Refrigeration Institute Comments Air-conditioning, Heating, and Refrigeration Institute Comments These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the May 10, 2016 Federal Register requesting information to assist DOE in reviewing existing regulations pursuant to Executive Order 13563 "Improving Regulation and Regulatory

  16. Air-Conditioning, Heating, and Refrigeration Institute (AHRI...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI ... PDF icon DOE Com Reg Burden RFI 9-7-12.pdf More Documents & Publications Regulatory Burden ...

  17. Floor-supply displacement air-conditioning: Laboratory experiments

    SciTech Connect (OSTI)

    Akimoto, Takashi; Nobe, Tatsuo; Tanabe, Shinichi; Kimura, Kenichi

    1999-07-01

    The results of laboratory measurements on the performance of a floor-supply displacement air-conditioning system in comparison to a displacement ventilation system with a side-wall-mounted diffuser and a ceiling-based distribution system are described. Thermal stratification was observed, as there were greater vertical air temperature differences in both of the displacement systems than in the ceiling-based system. The floor-supply displacement air-conditioning system produced a uniformly low air velocity at each measurement height, while a rather high air velocity near the floor was observed for the displacement ventilation system with a sidewall-mounted diffuser. Local mean age of air of the floor-supply displacement air-conditioning system was lower than that of the other systems, especially in the lower part of the room. According to the simulation results, the floor-supply displacement air-conditioning system with outdoor air cooling requires 34% less energy than the conventional air-conditioning system with outdoor air cooling.

  18. Heating, Ventilation, and Air Conditioning Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heating, Ventilation, and Air Conditioning Projects Heating, Ventilation, and Air Conditioning Projects AS-IHP System Concept Sketch. Image credit: Oak Ridge National Laboratory Air-Source Integrated Heat Pump Lead Performer: Oak Ridge National Laboratory - Oak Ridge, TN Partner: Lennox Building-Integrated Heat & Moisture Exchange (SBIR Phase 2B) Lead Performer: Architectural Applications - Portland, Oregon Partner: Oregon State University - Corvallis, Oregon Left: Environmental chamber to

  19. BEETIT: Building Cooling and Air Conditioning

    SciTech Connect (OSTI)

    2010-09-01

    BEETIT Project: The 14 projects that comprise ARPA-E’s BEETIT Project, short for “Building Energy Efficiency Through Innovative Thermodevices,” are developing new approaches and technologies for building cooling equipment and air conditioners. These projects aim to drastically improve building energy efficiency and reduce greenhouse gas emissions such as carbon dioxide (CO2) at a cost comparable to current technologies.

  20. Air conditioning system with supplemental ice storing and cooling capacity

    DOE Patents [OSTI]

    Weng, Kuo-Lianq; Weng, Kuo-Liang

    1998-01-01

    The present air conditioning system with ice storing and cooling capacity can generate and store ice in its pipe assembly or in an ice storage tank particularly equipped for the system, depending on the type of the air conditioning system. The system is characterized in particular in that ice can be produced and stored in the air conditioning system whereby the time of supplying cooled air can be effectively extended with the merit that the operation cycle of the on and off of the compressor can be prolonged, extending the operation lifespan of the compressor in one aspect. In another aspect, ice production and storage in great amount can be performed in an off-peak period of the electrical power consumption and the stored ice can be utilized in the peak period of the power consumption so as to provide supplemental cooling capacity for the compressor of the air conditioning system whereby the shift of peak and off-peak power consumption can be effected with ease. The present air conditioning system can lower the installation expense for an ice-storing air conditioning system and can also be applied to an old conventional air conditioning system.

  1. Contractor Past Performance Information

    Broader source: Energy.gov (indexed) [DOE]

    management controls and the compliance assessments of contractor performance information. Section IV has best practices to address contractor performance information....

  2. Advanced Development and Market Penetration of Desiccant-Based Air-Conditioning Systems

    SciTech Connect (OSTI)

    Vineyard, E A; Sand, J R; Linkous, R L; Baskin, E; Mason, D

    1998-01-01

    Desiccant Air Conditioning Systems can be used as alternatives for conventional air conditioning equipment in any commercial or residential building.

  3. Desiccant Enhanced Evaporative Air Conditioning: Parametric Analysis and Design; Preprint

    SciTech Connect (OSTI)

    Woods, J.; Kozubal, E.

    2012-10-01

    This paper presents a parametric analysis using a numerical model of a new concept in desiccant and evaporative air conditioning. The concept consists of two stages: a liquid desiccant dehumidifier and a dew-point evaporative cooler. Each stage consists of stacked air channel pairs separated by a plastic sheet. In the first stage, a liquid desiccant film removes moisture from the process (supply-side) air through a membrane. An evaporatively-cooled exhaust airstream on the other side of the plastic sheet cools the desiccant. The second-stage indirect evaporative cooler sensibly cools the dried process air. We analyze the tradeoff between device size and energy efficiency. This tradeoff depends strongly on process air channel thicknesses, the ratio of first-stage to second-stage area, and the second-stage exhaust air flow rate. A sensitivity analysis reiterates the importance of the process air boundary layers and suggests a need for increasing airside heat and mass transfer enhancements.

  4. Facility Management Contractors and other Contractors Directory |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Facility Management Contractors and other Contractors Directory Facility Management Contractors and other Contractors Directory FMCs achieve the mission of the field site they manage and operate, they have independent buying authority and use best commercial practices to subcontract for supplies and services. Moreover, the Department flows-down small business buying preferences in order to help the FMCs meet their small business subcontracting plan goals. Historically,

  5. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Utah's Division of Occupational and Professional Licensing requires installers of solar energy systems to be licensed contractors. General electrical contractors carrying an S200 or an S201...

  6. DOE CONTRACTOR PENSION PLANS

    Energy Savers [EERE]

    Contractor's workforce and sponsors the employee pension and benefit plans; or (b) ... DOE-H-200x EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation ...

  7. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    The Arizona Registrar of Contractors does have a specific plumbing license which includes solar water heaters. R-37 is required for contractors installing or performing maintenance on residential...

  8. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    officers as they evaluate the integrity and performance of prospective contractors. ... 52.209-8) Contractor Sampling, random inspection of the FAPIIS and other relevant sources. ...

  9. Non-CFC air conditioning for transit buses

    SciTech Connect (OSTI)

    Pesaran, A.A.; Parent, Y.O.; Bharathan, D.

    1992-11-01

    In the United Sates, more than 80% of transit city buses are air conditioned. Vapor compression refrigeration systems are standard for air conditioning buses and account for up to 25% of fuel consumption in the cooling season. Vapor compression devices use chlorofluorocarbons (CFCs), chemicals that contributes to Earths`s ozone depletion and to global warming. Currently, evaporative cooling is an economical alternative to CFC vapor compression refrigeration for air conditioning buses. It does not use CFCs but is restricted in use to arid climates. This limitation can be eliminated by dehumidifying the supply air using desiccants. We studied desiccant systems for cooling transit buses and found that the use of a desiccant-assisted evaporative cooling system is feasible and can deliver the required cooling. The weight and the size of the desiccant system though larger than vapor compression systems, can be easily accommodated within a bus. Fuel consumption for naming desiccant systems was about 70% less than CFC refrigeration system, resulting in payback periods of less than 2.5 years under most circumstances. This preliminary study indicated that desiccant systems combined with evaporative cooling is a CFC-free option to vapor compression refrigeration for air conditioning of transit buses. The concept is ready to be tested in a fun prototype scale in a commercial bus.

  10. Non-CFC air conditioning for transit buses

    SciTech Connect (OSTI)

    Pesaran, A.A.; Parent, Y.O.; Bharathan, D.

    1992-11-01

    In the United Sates, more than 80% of transit city buses are air conditioned. Vapor compression refrigeration systems are standard for air conditioning buses and account for up to 25% of fuel consumption in the cooling season. Vapor compression devices use chlorofluorocarbons (CFCs), chemicals that contributes to Earths's ozone depletion and to global warming. Currently, evaporative cooling is an economical alternative to CFC vapor compression refrigeration for air conditioning buses. It does not use CFCs but is restricted in use to arid climates. This limitation can be eliminated by dehumidifying the supply air using desiccants. We studied desiccant systems for cooling transit buses and found that the use of a desiccant-assisted evaporative cooling system is feasible and can deliver the required cooling. The weight and the size of the desiccant system though larger than vapor compression systems, can be easily accommodated within a bus. Fuel consumption for naming desiccant systems was about 70% less than CFC refrigeration system, resulting in payback periods of less than 2.5 years under most circumstances. This preliminary study indicated that desiccant systems combined with evaporative cooling is a CFC-free option to vapor compression refrigeration for air conditioning of transit buses. The concept is ready to be tested in a fun prototype scale in a commercial bus.

  11. Keeping Cool Without Air Conditioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Keeping Cool Without Air Conditioning Keeping Cool Without Air Conditioning August 2, 2013 - 9:50am Addthis Trees can save you energy by blocking sunlight in the summer and letting it through in the winter. | Photo courtesy of ©iStockphoto/blackie Trees can save you energy by blocking sunlight in the summer and letting it through in the winter. | Photo courtesy of ©iStockphoto/blackie Elizabeth Spencer Communicator, National Renewable Energy Laboratory How can I participate? Check out these

  12. STEP Preferred Contractors

    Broader source: Energy.gov [DOE]

    STEP Preferred Contractors, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  13. Magnetic Refrigeration Technology for High Efficiency Air Conditioning

    SciTech Connect (OSTI)

    Boeder, A; Zimm, C

    2006-09-30

    Magnetic refrigeration was investigated as an efficient, environmentally friendly, flexible alternative to conventional residential vapor compression central air conditioning systems. Finite element analysis (FEA) models of advanced geometry active magnetic regenerator (AMR) beds were developed to minimize bed size and thus magnet mass by optimizing geometry for fluid flow and heat transfer and other losses. Conventional and magnetocaloric material (MCM) regenerator fabrication and assembly techniques were developed and advanced geometry passive regenerators were built and tested. A subscale engineering prototype (SEP) magnetic air conditioner was designed, constructed and tested. A model of the AMR cycle, combined with knowledge from passive regenerator experiments and FEA results, was used to design the regenerator beds. A 1.5 Tesla permanent magnet assembly was designed using FEA and the bed structure and plenum design was extensively optimized using FEA. The SEP is a flexible magnetic refrigeration platform, with individually instrumented beds and high flow rate and high frequency capability, although the current advanced regenerator geometry beds do not meet performance expectations, probably due to manufacturing and assembly tolerances. A model of the AMR cycle was used to optimize the design of a 3 ton capacity magnetic air conditioner, and the system design was iterated to minimize external parasitic losses such as heat exchanger pressure drop and fan power. The manufacturing cost for the entire air conditioning system was estimated, and while the estimated SEER efficiency is high, the magnetic air conditioning system is not cost competitive as currently configured. The 3 ton study results indicate that there are other applications where magnetic refrigeration is anticipated to have cost advantages over conventional systems, especially applications where magnetic refrigeration, through the use of its aqueous heat transfer fluid, could eliminate intermediate

  14. Do residential air-conditioning rebates miss the mark?

    SciTech Connect (OSTI)

    Stickney, B.; Shepard, M.

    1994-12-31

    The rebates utilities provide for residential central air conditioners and heat pumps to encourage improved cooling efficiency may inadvertently reward higher peak demand in many cases. This problem could be avoided by using both efficiency and peak performance to determine eligibility for rebates. Such changes to incentive formulas would better align the utilities` DSM programs with the dual goals of improved efficiency and peak demand reduction. Improved peak performance would be especially advantageous for sunbelt utilities whose residential cooling load is highly coincident with the summer peak. Air conditioning has been called the utilities` ``load from hell,`` because it is intermittent, unpredictable, and is the largest contributor to summer peak demand, requiring massive investments in power generation and delivery capacity. It is no wonder then that more DSM programs are targeted at space cooling than at any other end use. Ironically, however, all of the residential rebate programs the authors examined for central air conditioners and heat pumps are based on the seasonal energy efficiency ratio (SEER), which provides a valuable measure of seasonal energy efficiency but is not a good indicator of peak demand. Residential central air conditioning incentive programs for eight major utilities are based exclusively on SEER and most ratchet up the incentive levels with increasing SEER. None include the measure for peak demand for residential cooling equipment, which is the so-called energy efficiency ratio, or EER.

  15. High Technology Centrifugal Compressor for Commercial Air Conditioning Systems

    SciTech Connect (OSTI)

    Ruckes, John

    2006-04-15

    R&D Dynamics, Bloomfield, CT in partnership with the State of Connecticut has been developing a high technology, oil-free, energy-efficient centrifugal compressor called CENVA for commercial air conditioning systems under a program funded by the US Department of Energy. The CENVA compressor applies the foil bearing technology used in all modern aircraft, civil and military, air conditioning systems. The CENVA compressor will enhance the efficiency of water and air cooled chillers, packaged roof top units, and other air conditioning systems by providing an 18% reduction in energy consumption in the unit capacity range of 25 to 350 tons of refrigeration The technical approach for CENVA involved the design and development of a high-speed, oil-free foil gas bearing-supported two-stage centrifugal compressor, CENVA encompassed the following high technologies, which are not currently utilized in commercial air conditioning systems: Foil gas bearings operating in HFC-134a; Efficient centrifugal impellers and diffusers; High speed motors and drives; and System integration of above technologies. Extensive design, development and testing efforts were carried out. Significant accomplishments achieved under this program are: (1) A total of 26 builds and over 200 tests were successfully completed with successively improved designs; (2) Use of foil gas bearings in refrigerant R134a was successfully proven; (3) A high speed, high power permanent magnet motor was developed; (4) An encoder was used for signal feedback between motor and controller. Due to temperature limitations of the encoder, the compressor could not operate at higher speed and in turn at higher pressure. In order to alleviate this problem a unique sensorless controller was developed; (5) This controller has successfully been tested as stand alone; however, it has not yet been integrated and tested as a system; (6) The compressor successfully operated at water cooled condensing temperatures Due to temperature

  16. Renewable Energy Contractor Licensing

    Broader source: Energy.gov [DOE]

    Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of...

  17. Identification of DOE Contractors

    Broader source: Energy.gov [DOE]

    The attached guidance is issued to Contracting Officers to remind them of the need for DOE's contractor staff to appropriately identify themselves as contractor employees and not federal employees.

  18. Contractor Past Performance Information

    Broader source: Energy.gov (indexed) [DOE]

    2013) 3 the use of contractor performance information, outlines associated management responsibilities that agency Chief Acquisition Officers (CAOs) and Senior...

  19. Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractors Contractors The U.S. Department of Energy's Oak Ridge Office of Environmental Management uses three prime contractors to conduct its major cleanup projects at the site. These companies include URS|CH2M Oak Ridge LLC (UCOR), North Wind Solutions LLC, and Isotek Systems LLC. UCOR is the Department of Energy's primary cleanup contractor for the DOE Oak Ridge Reservation, primarily focused on cleanup of East Tennessee Technology Park (the former Oak Ridge K-25 Site). UCOR is also engaged

  20. RL Contractors - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland Operations Office Richland Operations Office RL Contractors Richland Operations Office Richland Operations Office RL Cleanup Vision RL Contractors CH2M Mission Support Alliance Washington Closure Hanford HPM Corporation RL Contracts and Procurements Hanford Site Tours River Corridor Central Plateau Groundwater Mission Support Newsroom RL Contractors Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Richland Operations Office uses contractors to

  1. Effect of Intake Air Filter Condition on Vehicle Fuel Economy

    SciTech Connect (OSTI)

    Norman, Kevin M; Huff, Shean P; West, Brian H

    2009-02-01

    The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy and the U.S. Environmental Protection Agency (EPA) jointly maintain a fuel economy website (www.fueleconomy.gov), which helps fulfill their responsibility under the Energy Policy Act of 1992 to provide accurate fuel economy information [in miles per gallon (mpg)] to consumers. The site provides information on EPA fuel economy ratings for passenger cars and light trucks from 1985 to the present and other relevant information related to energy use such as alternative fuels and driving and vehicle maintenance tips. In recent years, fluctuations in the price of crude oil and corresponding fluctuations in the price of gasoline and diesel fuels have renewed interest in vehicle fuel economy in the United States. (User sessions on the fuel economy website exceeded 20 million in 2008 compared to less than 5 million in 2004 and less than 1 million in 2001.) As a result of this renewed interest and the age of some of the references cited in the tips section of the website, DOE authorized the Oak Ridge National Laboratory (ORNL) Fuels, Engines, and Emissions Research Center (FEERC) to initiate studies to validate and improve these tips. This report documents a study aimed specifically at the effect of engine air filter condition on fuel economy. The goal of this study was to explore the effects of a clogged air filter on the fuel economy of vehicles operating over prescribed test cycles. Three newer vehicles (a 2007 Buick Lucerne, a 2006 Dodge Charger, and a 2003 Toyota Camry) and an older carbureted vehicle were tested. Results show that clogging the air filter has no significant effect on the fuel economy of the newer vehicles (all fuel injected with closed-loop control and one equipped with MDS). The engine control systems were able to maintain the desired AFR regardless of intake restrictions, and therefore fuel consumption was not increased. The carbureted engine did show a decrease in

  2. In-Cab Air Quality of Trucks Air Conditioned and Kept in Electrified Truck Stop

    SciTech Connect (OSTI)

    Lee, Doh-Won; Zietsman, Josias; Farzaneh, Mohamadreza; Li, Wen-Whai; Olvera, Hector; Storey, John Morse; Kranendonk, Laura

    2009-01-01

    At night, long-haul truck drivers rest inside the cabins of their vehicles. Therefore, the in-cab air quality while air conditioning (A/C) is being provided can be a great concern to the drivers health. The effect of using different A/C methods [truck's A/C, auxiliary power unit (APU), and truck stop electrification (TSE) unit] on in-cab air quality of a heavy-duty diesel vehicle was investigated at an electrified truck stop in the El Paso, Texas, area. The research team measured the in-cabin and the ambient air quality adjacent to the parked diesel truck as well as emissions from the truck and an APU while it was providing A/C. The measured results were compared and analyzed. On the basis of these results, it was concluded that the TSE unit provided better in-cab air quality while supplying A/C. Furthermore, the truck and APU exhaust emissions were measured, and fuel consumption of the truck (while idling) and the APU (during operation) were compared. The results led to the finding that emissions from the APU were less than those from the truck's engine idling, but the APU consumed more fuel than the engine while providing A/C under given conditions.

  3. Contractor Employee Assistance at DOE Contractor Sites

    Office of Energy Efficiency and Renewable Energy (EERE)

    The DOE Employee Assistance Program (EAP) for DOE contractor and subcontractor workers complements the DOE medical and psychological evaluations and surveillance program. The EAP provides contractor workers who are experiencing personal problems with an opportunity to receive appropriate treatment and support. The goal of the EAP is to provide a conduit through which the individual can resolve personal and workplace problems. The HSS EAP Manager aids the DOE contracting organizations to maintain a healthy and productive workforce.

  4. Liquid over-feeding air conditioning system and method

    DOE Patents [OSTI]

    Mei, V.C.; Chen, F.C.

    1993-09-21

    A refrigeration air conditioning system utilizing a liquid over-feeding operation is described. A liquid refrigerant accumulator-heat exchanger is placed in the system to provide a heat exchange relationship between hot liquid refrigerant discharged from condenser and a relatively cool mixture of liquid and vaporous refrigerant discharged from the evaporator. This heat exchange relationship substantially sub-cools the hot liquid refrigerant which undergoes little or no evaporation across the expansion device and provides a liquid over-feeding operation through the evaporator for effectively using 100 percent of evaporator for cooling purposes and for providing the aforementioned mixture of liquid and vaporous refrigerant. 1 figure.

  5. Liquid over-feeding air conditioning system and method

    DOE Patents [OSTI]

    Mei, Viung C.; Chen, Fang C.

    1993-01-01

    A refrigeration air conditioning system utilizing a liquid over-feeding operation is described. A liquid refrigerant accumulator-heat exchanger is placed in the system to provide a heat exchange relationship between hot liquid refrigerant discharged from condenser and a relatively cool mixture of liquid and vaporous refrigerant discharged from the evaporator. This heat exchange relationship substantially sub-cools the hot liquid refrigerant which undergoes little or no evaporation across the expansion device and provides a liquid over-feeding operation through the evaporator for effectively using 100 percent of evaporator for cooling purposes and for providing the aforementioned mixture of liquid and vaporous refrigerant.

  6. Saving Money During the Air Conditioning Season | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Keeping your air conditioner maintained can help save you money this summer. | Photo courtesy of iStockphotofiremanYU Keeping your air conditioner maintained can help save you ...

  7. The Future of Air Conditioning for Buildings - Executive Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Executive Summary July 2016 W. Goetzler, M. Guernsey, J. Young, J. Fuhrman Navigant Consulting, Inc. O. Abdelaziz, PhD Oak Ridge National Laboratory (This page intentionally left blank) NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or

  8. Contractor Past Performance Information

    Energy Savers [EERE]

    Contractor Human Resources Management Contractor Human Resources Management Value Study Desk Manual & Cost Study Manual Memo from Robert Myers regarding DOE Benefit Value Desk Manual (56.76 KB) Value Study Desk Manual (1005.83 KB) Cost study manual 06 29 2012.pdf (334.92 KB) More Documents & Publications Value Study Desk Manual VALUE STUDY VALUE STUDY

    6 (August 2013) 1 Reporting Other Contractor Information into Federal Awardee Performance and Integrity Information System (FAPIIS)

  9. Contractor Past Performance Information

    Energy Savers [EERE]

    5 (February 2015) 1 Contractor Performance Information This chapter is updated to incorporate OFPP Memorandum dated July 10, 2014, "Making Better Use of Contractor Performance Information" which provides instruction to Contracting Officers and other members of the acquisition workforce in the pre-award phase of acquisition actions by making better use of contractor performance information. This chapter also incorporates the Office of Federal Procurement Policy (OFPP) policy that became

  10. Homeowner and Contractor Surveys

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Homeowner and Contractor Surveys, Call Slides and Discussion Summary, January 19, 2012.

  11. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A description of the Contractor Employee Compensation Program should include the following components; a. Philosophy and strategy for all pay delivery programs. b. System for ...

  12. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    In June 2005, Assembly Bill 3 amended the Nevada Revised Statutes, Chapter 618, to create a mandatory licensing program for contractors installing and maintaining photovoltaic systems, beginning...

  13. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Hawaii offers several specialty licenses for solar contractors through Hawaii’s Department of Commerce and Consumer Affairs. The following specialty licenses are available: Solar Power Systems...

  14. Working Effectively with Contractors

    Broader source: Energy.gov [DOE]

    On March 2, 2011, the Department issued the attached memorandum for heads of departmental elements that addressed the respective roles of Departmental officials and contractors.

  15. Pages - Contractor Assurance Home

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    safety Management (ISM). Metrics and targets to assess performance, including benchmarking of key functional areas with other DOE contractors, industry and research...

  16. Prediction of Air Conditioning Load Response for Providing Spinning Reserve - ORNL Report

    SciTech Connect (OSTI)

    Kueck, John D; Kirby, Brendan J; Ally, Moonis Raza; Rice, C Keith

    2009-02-01

    This report assesses the use of air conditioning load for providing spinning reserve and discusses the barriers and opportunities. Air conditioning load is well suited for this service because it often increases during heavy load periods and can be curtailed for short periods with little impact to the customer. The report also provides an appendix describing the ambient temperature effect on air conditioning load.

  17. Solar and Wind Contractor Licensing

    Broader source: Energy.gov [DOE]

    In June of 2014, SB 447 mandated that the Louisiana State Licencsing Board for Contractors develop new rules for solar contractors no later than January 1, 2015. Licensed contractors must be in c...

  18. Improving Contractor Past Performance

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Federal Procurement Policy, (OFPP) performed an assessment of how well some agencies, including the Department of Energy, are managing these efforts. The attached OFPP memorandum of January 21, 2011, entitled "Improving the Use of Contractor Performance Information Assessments: Summary of the Office of Federal Procurement Policy's review, and Strategies for Improvement" provides the details of this assessment which includes the Department of Energy. Also, the memo provides some very good guidance on preparing contractor performance evaluation reports. The Acquisition Guide Chapter 42.15 Contractor Performance Information incorporates the guidance that is not otherwise part of the Chapter. Revisions are made to Section II – Parts C and I.

  19. Desiccant Enhanced Evaporative Air-Conditioning (DEVap): Evaluation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... air conditioner market will create some market risk. ... AC. The availability of natural gas or other thermal energy ... 46 5.3 Solar Thermal Integration ......

  20. HEATING, AIR-CONDITIONING AND REFRIGERATION DISTRIBUTORS INTERNATIONAL (HARDI)

    Broader source: Energy.gov [DOE]

    OE Framework Document and Stakeholder Meeting regarding the Enforcement of the updated Energy Conservation Standards for Air Conditioners, Furnaces and Heat Pumps.

  1. Contractor Past Performance Information

    Broader source: Energy.gov (indexed) [DOE]

    to the Government and the contractor. A list of the e-mail notifications is as follows: Command POC Member assigned Focal Point assigned Alternate Focal Point assigned FAPIIS...

  2. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued...

  3. Contractor Past Performance Information

    Office of Environmental Management (EM)

    Contractor Legal Management Requirements Contractor Legal Management Requirements The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.) PF2010-81 Contractor Legal Management Requirements (58.82 KB) PF2010-81a.pdf (50.14 KB) PF2010-81b.pdf (100.89 KB) PF2010-81c.pdf (50.14 KB) PF2010-81d.pdf (100.89 KB) More

  4. Air-Conditioning, Heating, and Refrigeration Institute Ex Parte Memo

    Broader source: Energy.gov [DOE]

    On Friday, February 13, 2015, AHRI staff met telephonically with the Department of Energy to discuss issues pertaining to the ongoing efficiency standards rulemaking for single package vertical air...

  5. The Future of Air Conditioning for Buildings Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Future of Air Conditioning for Buildings Report The Future of Air Conditioning for Buildings Report This report characterizes the current landscape and trends in the global air conditioning (A/C) market, including discussion of both direct and indirect climate impacts, and potential global warming impacts from growing global A/C usage. The report also documents solutions that can help achieve international goals for energy efficiency and greenhouse gas (GHG) emissions reductions. The

  6. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

  7. Ice storage rooftop retrofit for rooftop air conditioning

    SciTech Connect (OSTI)

    Tomlinson, J.J.; Jennings, L.W.

    1997-09-01

    A significant fraction of the floor space in commercial and federal buildings is cooled by single-package rooftop air conditioning units. These units are located on flat roofs and usually operate during the day under hot conditions. They are usually less energy efficient than a chiller system for building cooling. Several U.S. companies are developing systems that employ ice storage in conjunction with chillers to replace older, inefficient rooftop units for improved performance and minimal use of on-peak electricity. Although the low evaporator temperatures needed for ice making tend to reduce the efficiency of the chiller, the overall operating costs of the ice storage system may be lower than that of a packaged, conventional rooftop installation. One version of this concept, the Roofberg{reg_sign} System developed by the Calmac Corporation, was evaluated on a small building at Oak Ridge National Laboratory in Oak Ridge, Tennessee. The Roofberg system consists of a chiller, an ice storage tank, and one or more rooftop units whose evaporator coils have been adapted to use a glycol solution for cooling. The ice storage component decouples the cooling demand of the building from the operation of the chiller. Therefore, the chiller can operate at night (cooler, more efficient condensing temperatures) to meet a daytime cooling demand. This flexibility permits a smaller chiller to satisfy a larger peak cooling load. Further, the system can be operated to shift the cooling demand to off-peak hours when electricity from the utility is generated more efficiently and at lower cost. This Roofberg system was successfully installed last year on a small one-story office building in Oak Ridge and is currently being operated to cool the building. The building and system were sufficiently instrumented to allow a determination of the performance and efficiency of the Roofberg system. Although the energy efficiency of a simulated Roofberg storage/chiller concept operating in the

  8. Retrofitting Air Conditioning and Duct Systems in Hot, Dry Climates

    SciTech Connect (OSTI)

    Shapiro, C.; Aldrich, R.; Arena, L.

    2012-07-01

    This technical report describes CARB's work with Clark County Community Resources Division in Las Vegas, Nevada, to optimize procedures for upgrading cooling systems on existing homes in the area to implement health, safety, and energy improvements. Detailed monitoring of five AC systems showed that three of the five systems met or exceeded air flow rate goals.

  9. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5-16 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  10. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    01-13 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  11. Opportunities to Reduce Air-Conditioning Loads Through Lower Cabin Soak Temperatures

    SciTech Connect (OSTI)

    Farrington, R.; Cuddy, M.; Keyser, M.; Rugh, J.

    1999-07-12

    Air-conditioning loads can significantly reduce electric vehicle (EV) range and hybrid electric vehicle (HEV) fuel economy. In addition, a new U. S. emissions procedure, called the Supplemental Federal Test Procedure (SFTP), has provided the motivation for reducing the size of vehicle air-conditioning systems in the United States. The SFTP will measure tailpipe emissions with the air-conditioning system operating. If the size of the air-conditioning system is reduced, the cabin soak temperature must also be reduced, with no penalty in terms of passenger thermal comfort. This paper presents the impact of air-conditioning on EV range and HEV fuel economy, and compares the effectiveness of advanced glazing and cabin ventilation. Experimental and modeled results are presented.

  12. Contractor Legal Management Requirements

    Broader source: Energy.gov [DOE]

    The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.)

  13. Contractor Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-11-05

    This Manual establishes requirements for the management and operation of the U.S. Department of Energy contractor protective forces. Cancels: DOE M 470.4-3 Chg 1, CRD (Attachment 2) only, except for Section C. Canceled by DOE O 473.3.

  14. Low-Flow Liquid Desiccant Air Conditioning: General Guidance and Site Considerations

    SciTech Connect (OSTI)

    Kozubal, E.; Herrmann, L.; Deru, M.; Clark, J.

    2014-09-01

    Dehumidification or latent cooling in buildings is an area of growing interest that has been identified as needing more research and improved technologies for higher performance. Heating, ventilating, and air-conditioning (HVAC) systems typically expend excessive energy by using overcool-and-reheat strategies to dehumidify buildings. These systems first overcool ventilation air to remove moisture and then reheat the air to meet comfort requirements. Another common strategy incorporates solid desiccant rotors that remove moisture from the air more efficiently; however, these systems increase fan energy consumption because of the high airside pressure drop of solid desiccant rotors and can add heat of absorption to the ventilation air. Alternatively, liquid desiccant air-conditioning (LDAC) technology provides an innovative dehumidification solution that: (1) eliminates the need for overcooling and reheating from traditional cooling systems; and (2) avoids the increased fan energy and air heating from solid desiccant rotor systems.

  15. Innovative Evaporative and Thermally Activated Technologies Improve Air Conditioning; The Spectrum of Clean Energy Innovation (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-06-01

    Fact sheet describes NREL's work on a desiccant enhanced evaporative air conditioner (DEVap) that uses 90% less electricity than traditional air conditioning units.

  16. Approaches to Approved Contractor Lists

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Workforce / Business Partners Peer Exchange Call: Approaches to Approved Contractor Lists, Call Slides and Summary, April 25, 2013. This workforce/business partners peer exchange call discussed approaches to approved contractor lists.

  17. Air Conditioning Stall Phenomenon Testing, Model Development, and Simulation

    SciTech Connect (OSTI)

    Irminger, Philip; Rizy, D Tom; Li, Huijuan; Smith, Travis; Rice, C Keith; Li, Fangxing; Adhikari, Sarina

    2012-01-01

    Electric distribution systems are experiencing power quality issues of extended reduced voltage due to fault-induced delayed voltage recovery (FIDVR). FIDVR occurs in part because modern air conditioner (A/C) and heat pump compressor motors are much more susceptible to stalling during a voltage sag or dip such as a sub-transmission fault. They are more susceptible than older A/C compressor motors due to the low inertia of these newer and more energy efficient motors. There is a concern that these local reduced voltage events on the distribution system will become more frequent and prevalent and will combine over larger areas and challenge transmission system voltage and ultimately power grid reliability. The Distributed Energy Communications and Controls (DECC) Laboratory at Oak Ridge National Laboratory (ORNL) has been employed to (1) test, (2) characterize and (3) model the A/C stall phenomenon.

  18. Policy Memo: Working Effectively with Contractors | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Memo: Working Effectively with Contractors Policy Memo: Working Effectively with Contractors Guidance on working effectively with contractors. PDF icon MAPolicyMemoWorkingw...

  19. Homeowner and Contractor Surveys | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Homeowner and Contractor Surveys Homeowner and Contractor Surveys Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Homeowner and Contractor Surveys, ...

  20. Contractor Human Resources | National Nuclear Security Administration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor Human Resources The Contractor Human Resources mission is to provide expert advice and assistance to our customers in order to ensure quality Contractor Human Resource ...

  1. Desiccant Enhanced Evaporative Air-Conditioning (DEVap): Evaluation of a New Concept in Ultra Efficient Air Conditioning

    SciTech Connect (OSTI)

    Kozubal, E.; Woods, J.; Burch, J.; Boranian, A.; Merrigan, T.

    2011-01-01

    NREL has developed the novel concept of a desiccant enhanced evaporative air conditioner (DEVap) with the objective of combining the benefits of liquid desiccant and evaporative cooling technologies into an innovative 'cooling core.' Liquid desiccant technologies have extraordinary dehumidification potential, but require an efficient cooling sink. DEVap's thermodynamic potential overcomes many shortcomings of standard refrigeration-based direct expansion cooling. DEVap decouples cooling and dehumidification performance, which results in independent temperature and humidity control. The energy input is largely switched away from electricity to low-grade thermal energy that can be sourced from fuels such as natural gas, waste heat, solar, or biofuels.

  2. CONTRACTOR PURCHASING SYSTEM REVIEWS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page 1 APPENDIX C CONTRACTOR PURCHASING SYSTEM REVIEWS RISK ASSESSMENT MATRIX RISK CATEGORY PERFORMANCE SCHEDULE COST HIGH (3) --Performance data casts significant doubt on the ability of the system or key process ability to meet requirements. A major disruption is highly probable and the likelihood is that the supplier will not achieve the performance, schedule or cost objectives * Delinquent end item delivery * Poor or nonexistent internal audit/self governance * Failure to meet

  3. System and method for conditioning intake air to an internal combustion engine

    SciTech Connect (OSTI)

    Sellnau, Mark C.

    2015-08-04

    A system for conditioning the intake air to an internal combustion engine includes a means to boost the pressure of the intake air to the engine and a liquid cooled charge air cooler disposed between the output of the boost means and the charge air intake of the engine. Valves in the coolant system can be actuated so as to define a first configuration in which engine cooling is performed by coolant circulating in a first coolant loop at one temperature, and charge air cooling is performed by coolant flowing in a second coolant loop at a lower temperature. The valves can be actuated so as to define a second configuration in which coolant that has flowed through the engine can be routed through the charge air cooler. The temperature of intake air to the engine can be controlled over a wide range of engine operation.

  4. Evaluating Membrane Processes for Air Conditioning; Highlights in Research and Development, NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    2015-06-01

    This NREL Highlight discusses a recent state-of-the-art review of membrane processes for air conditioning that identifies future research opportunities. This highlight is being developed for the June 2015 S&T Alliance Board meeting.

  5. Proposal for a Vehicle Level Test Procedure to Measure Air Conditioning Fuel Use: Preprint

    SciTech Connect (OSTI)

    Rugh, J.

    2010-02-01

    A procedure is described to measure approximate real-world air conditioning fuel use and assess the impact of thermal load reduction strategies in plug-in hybrid electric vehicles.

  6. Fuel Savings and Emission Reductions from Next-Generation Mobile Air Conditioning Technology in India: Preprint

    SciTech Connect (OSTI)

    Chaney, L.; Thundiyil, K.; Chidambaram, S.; Abbi, Y. P.; Anderson, S.

    2007-05-01

    This paper quantifies the mobile air-conditioning fuel consumption of the typical Indian vehicle, exploring potential fuel savings and emissions reductions these systems for the next generation of vehicles.

  7. ISSUANCE 2015-12-17: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment and Commercial Warm Air Furnaces

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment and Commercial Warm Air Furnaces

  8. ISSUANCE 2015-12-17: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment and Commercial Warm Air Furnaces

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment and Commercial Warm Air Furnaces, Supplemental Notice of Proposed Rulemaking

  9. Targeting Contractors That Target Moderate Income Homeowners

    Broader source: Energy.gov [DOE]

    Provides an overview of the services provided by EGIA including business development webinars, a contractor exchange, and contractor recognition.

  10. Management and Operating Contractors' Subcontract Audit Coverage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management and Operating Contractors' Subcontract Audit Coverage DOEIG-0885 April 2013 ... INFORMATION: Special Report on "Management and Operating Contractors' Subcontract ...

  11. EM Contractors for Capital Asset Projects

    Broader source: Energy.gov [DOE]

    Read the EM Contractors for Capital Asset Projects list, which includes the project name, number, site, and contractor.

  12. New Whole-House Solutions Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania

    SciTech Connect (OSTI)

    2014-10-01

    In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania, to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. The team evaluated a market-available through-wall air transfer fan system that provides air to the bedrooms.The relative ability of this system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability.

  13. Worldwide pipelines and contractors directory

    SciTech Connect (OSTI)

    1999-11-01

    This directory contains information on the following: pipeline contractors; US natural gas pipelines; US crude oil pipelines; US product pipelines; Canadian pipelines and foreign pipelines.

  14. contractor | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    - The National Nuclear Security Administration (NNSA) today announced the recipients of the 2014 Bradley A. Peterson Federal and Contractor Security Professional of the Year Awards...

  15. Facility Security Officer Contractor Toolcart

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    This correspondence course provides an overview of the roles and responsibilities of the DOE or DOE-contractor FSO. The course emphasizes facility clearance requirements, personnel ...

  16. Contractor Issues 2011 Annual Review

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Savannah River Remediation (SRR), the liquid waste contractor at the Savannah River Site (SRS), has released its 2011 Annual Review available here.

  17. Air Conditioning with Magnetic Refrigeration : An Efficient, Green Compact Cooling System Using Magnetic Refrigeration

    SciTech Connect (OSTI)

    2010-09-01

    BEETIT Project: Astronautics is developing an air conditioning system that relies on magnetic fields. Typical air conditioners use vapor compression to cool air. Vapor compression uses a liquid refrigerant to circulate within the air conditioner, absorb the heat, and pump the heat out into the external environment. Astronautics’ design uses a novel property of certain materials, called “magnetocaloric materials”, to achieve the same result as liquid refrigerants. These magnetocaloric materials essentially heat up when placed within a magnetic field and cool down when removed, effectively pumping heat out from a cooler to warmer environment. In addition, magnetic refrigeration uses no ozone-depleting gases and is safer to use than conventional air conditioners which are prone to leaks.

  18. Carbon Dioxide and Ionic Liquid Refrigerants: Compact, Efficient Air Conditioning with Ionic Liquid-Based Refrigerants

    SciTech Connect (OSTI)

    2010-10-01

    BEETIT Project: Notre Dame is developing an air-conditioning system with a new ionic liquid and CO2 as the working fluid. Synthetic refrigerants used in air conditioning and refrigeration systems are potent GHGs and can trap 1,000 times more heat in the atmosphere than CO2 alone—making CO2 an attractive alternative for synthetic refrigerants in cooling systems. However, operating cooling systems with pure CO2 requires prohibitively high pressures and expensive hardware. Notre Dame is creating a new fluid made of CO2 and ionic liquid that enables the use of CO2 at low pressures and requires minimal changes to existing hardware and production lines. This new fluid also produces no harmful emissions and can improve the efficiency of air conditioning systems— enabling new use of CO2 as a refrigerant in cooling systems.

  19. Designing Forced-Air HVAC Systems

    SciTech Connect (OSTI)

    2010-08-31

    This guide explains proper calculation of heating and cooling design loads for homes.used to calculated for the home using the protocols set forth in the latest edition of the Air Conditioning Contractors of America’s (ACCA) Manual J (currently the 8th edition), ASHRAE 2009 Handbook of Fundamentals, or an equivalent computation procedure.

  20. Management and operating contractor plan for transition to the project Hanford Management Contractor

    SciTech Connect (OSTI)

    Waite, J.L., Westinghouse Hanford

    1996-06-27

    This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

  1. Design of a test facility for gas-fired desiccant-based air conditioning systems

    SciTech Connect (OSTI)

    Jalalzadeh-Azar, A.A.; Steele, W.G.; Hodge, B.K.

    1996-12-31

    The design of a facility for testing desiccant-based air conditioning systems is presented. The determination of the performance parameters of desiccant systems is discussed including moisture removal capacity, latent and total cooling capacities, and efficiency indexes. The appropriate procedures and key measurements for determining these parameters are identified using uncertainty analysis.

  2. Proceedings of the 1993 non-fluorocarbon insulation, refrigeration and air conditioning technology workshop

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    Sessions included: HFC blown polyurethanes, carbon dioxide blown foam and extruded polystyrenes, plastic foam insulations, evacuated panel insulation, refrigeration and air conditioning, absorption and adsorption and stirling cycle refrigeration, innovative cooling technologies, and natural refrigerants. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  3. Performance and evaluation of gas engine driven rooftop air conditioning equipment at the Willow Grove (PA) Naval Air Station

    SciTech Connect (OSTI)

    Armstrong, P.R.; Conover, D.R.

    1993-05-01

    In a field evaluation conducted for the US Department of Energy (DOE) Office of Federal Energy Management Program (FEMP), the Pacific Northwest Laboratory (PNL) examined the performance of a new US energy-related technology under the FEMP Test Bed Demonstration Program. The technology was a 15-ton natural gas engine driven roof top air conditioning unit. Two such units were installed on a naval retail building to provide space conditioning to the building. Under the Test Bed Demonstration Program, private and public sector interests are focused to support the installation and evaluation of new US technologies in the federal sector. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) with DOE were the American Gas Cooling Center, Philadelphia Electric Company, Thermo King Corporation, and the US Naval Air Station at Willow Grove, Pennsylvania. Equipment operating and service data as well as building interior and exterior conditions were secured for the 1992 cooling season. Based on a computer assessment of the building using standard weather data, a comparison was made with the energy and operating costs associated with the previous space conditioning system. Based on performance during the 1992 cooling season and adjusted to a normal weather year, the technology will save the site $6,000/yr in purchased energy costs. An additional $9,000 in savings due to electricity demand ratchet charge reductions will also be realized. Detailed information on the technology, the installation, and the results of the technology test are provided to illustrate the advantages to the federal sector of using this technology. A history of the CRADA development process is also reported.

  4. Waking the sleeping giant: Introducing new heat exchanger technology into the residential air-conditioning marketplace

    SciTech Connect (OSTI)

    Chapp, T.; Voss, M.; Stephens, C.

    1998-07-01

    The Air Conditioning Industry has made tremendous strides in improvements to the energy efficiency and reliability of its product offerings over the past 40 years. These improvement can be attributed to enhancements of components, optimization of the energy cycle, and modernized and refined manufacturing techniques. During this same period, energy consumption for space cooling has grown significantly. In January of 1992, the minimum efficiency requirement for central air conditioning equipment was raised to 10 SEER. This efficiency level is likely to increase further under the auspices of the National Appliance Energy Conservation Act (NAECA). A new type of heat exchanger was developed for air conditioning equipment by Modine Manufacturing Company in the early 1990's. Despite significant advantages in terms of energy efficiency, dehumidification, durability, and refrigerant charge there has been little interest expressed by the air conditioning industry. A cooperative effort between Modine, various utilities, and several state energy offices has been organized to test and demonstrate the viability of this heat exchanger design throughout the nation. This paper will review the fundamentals of heat exchanger design and document this simple, yet novel technology. These experiences involving equipment retrofits have been documented with respect to the performance potential of air conditioning system constructed with PF{trademark} Heat Exchangers (generically referred to as microchannel heat exchangers) from both an energy efficiency as well as a comfort perspective. The paper will also detail the current plan to introduce 16 to 24 systems into an extended field test throughout the US which commenced in the Fall of 1997.

  5. Effect of Intake Air Filter Condition on Light-Duty Gasoline Vehicles

    SciTech Connect (OSTI)

    Thomas, John F; Huff, Shean P; West, Brian H; Norman, Kevin M

    2012-01-01

    Proper maintenance can help vehicles perform as designed, positively affecting fuel economy, emissions, and the overall drivability. This effort investigates the effect of one maintenance factor, intake air filter replacement, with primary focus on vehicle fuel economy, but also examining emissions and performance. Older studies, dealing with carbureted gasoline vehicles, have indicated that replacing a clogged or dirty air filter can improve vehicle fuel economy and conversely that a dirty air filter can be significantly detrimental to fuel economy. The effect of clogged air filters on the fuel economy, acceleration and emissions of five gasoline fueled vehicles is examined. Four of these were modern vehicles, featuring closed-loop control and ranging in model year from 2003 to 2007. Three vehicles were powered by naturally aspirated, port fuel injection (PFI) engines of differing size and cylinder configuration: an inline 4, a V6 and a V8. A turbocharged inline 4-cylinder gasoline direct injection (GDI) engine powered vehicle was the fourth modern gasoline vehicle tested. A vintage 1972 vehicle equipped with a carburetor (open-loop control) was also examined. Results reveal insignificant fuel economy and emissions sensitivity of modern vehicles to air filter condition, but measureable effects on the 1972 vehicle. All vehicles experienced a measured acceleration performance penalty with clogged intake air filters.

  6. Transactions, Technology and Contractor Human Relations | Department...

    Office of Environmental Management (EM)

    of the Assistant General Counsel for Contractor Human Resources (GC-63) Litigation, Regulation and Enforcement Environment and Compliance Transactions, Technology and Contractor ...

  7. Contractor Past Performance Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Contractor Past Performance Information More Documents & Publications Contractor Past Performance Information Policy Flash 2015-11 Microsoft Word - AcqGuide42pt Nov 2010...

  8. DOE Contractor Work Force Restructuring Approval Thresholds

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can ... to provide approval for NNSA work force restructurings in consultation with LM 501 ...

  9. Hanford Contractor Assumes Responsibility of Three Wastewater...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Assumes Responsibility of Three Wastewater Facilities Hanford Contractor Assumes Responsibility of Three Wastewater Facilities April 29, 2015 - 12:00pm Addthis The ...

  10. Leighton Contractors Pty Ltd | Open Energy Information

    Open Energy Info (EERE)

    Leighton Contractors Pty Ltd Jump to: navigation, search Name: Leighton Contractors Pty Ltd Place: Chatswood, New South Wales, Australia Zip: 2067 Sector: Renewable Energy,...

  11. Comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program

  12. Contractor SOW Template – ICE

    Broader source: Energy.gov [DOE]

    The template presented here is a Statement of Work (SOW) for services of an ICE Support Contractor for assisting OECM in conducting an ICE. Project and review specific information should be incorporated.

  13. Contractor SOW Template – ICR

    Broader source: Energy.gov [DOE]

    The template presented below is a Statement of Work (SOW) for services of an OECM ICR Support Contractor for assisting OCEM in performing an ICR. Project and review specific information should be incorporated.

  14. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

  15. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

  16. Facility Security Officer Contractor Toolcart

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... You possess an LSSO badge that has an L or Q clearance (employees, contractors, and ... The SNL Badge Office will issue you a memo verifying that your clearance is active. You ...

  17. Facility Security Officer Contractor Toolcart

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EXPORT/IMPORT CONTROL Contractors and subcontractors who engage in exporting and importing need to have an export/import control program. It is the responsibility of each contractor to: Interpret and comply with U.S. Export and Import Control Laws and Regulations. Make accurate Export Control determinations for information, technologies, and commodities they generate. Obtain required export and import licenses, permit, or other authorizations. Protect the information, technologies or commodities

  18. Low-Flow Liquid Desiccant Air-Conditioning: Demonstrated Performance and Cost Implications

    SciTech Connect (OSTI)

    Kozubal, E.; Herrmann, L.; Deru, M.; Clark, J.; Lowenstein, A.

    2014-09-01

    Cooling loads must be dramatically reduced when designing net-zero energy buildings or other highly efficient facilities. Advances in this area have focused primarily on reducing a building's sensible cooling loads by improving the envelope, integrating properly sized daylighting systems, adding exterior solar shading devices, and reducing internal heat gains. As sensible loads decrease, however, latent loads remain relatively constant, and thus become a greater fraction of the overall cooling requirement in highly efficient building designs, particularly in humid climates. This shift toward latent cooling is a challenge for heating, ventilation, and air-conditioning (HVAC) systems. Traditional systems typically dehumidify by first overcooling air below the dew-point temperature and then reheating it to an appropriate supply temperature, which requires an excessive amount of energy. Another dehumidification strategy incorporates solid desiccant rotors that remove water from air more efficiently; however, these systems are large and increase fan energy consumption due to the increased airside pressure drop of solid desiccant rotors. A third dehumidification strategy involves high flow liquid desiccant systems. These systems require a high maintenance separator to protect the air distribution system from corrosive desiccant droplet carryover and so are more commonly used in industrial applications and rarely in commercial buildings. Both solid desiccant systems and most high-flow liquid desiccant systems (if not internally cooled) add sensible energy which must later be removed to the air stream during dehumidification, through the release of sensible heat during the sorption process.

  19. Retrofitting Inefficient Rooftop Air-Conditioning Units Reduces U.S. Navy Energy Use (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-04-01

    As part of the U.S. Navy's overall energy strategy, the National Renewable Energy Laboratory (NREL) partnered with the Naval Facilities Engineering Command (NAVFAC) to demonstrate market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - retrofitting rooftop air-conditioning units with an advanced rooftop control system - was identified as a promising source for reducing energy use and costs, and can contribute to increasing energy security.

  20. Low-Flow Liquid Desiccant Air-Conditioning: Demonstrated Performance and Cost Implications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Flow Liquid Desiccant Air-Conditioning: Demonstrated Performance and Cost Implications Eric Kozubal, Lesley Herrmann, and Michael Deru National Renewable Energy Laboratory Jordan Clark University of Texas, Austin Andy Lowenstein AIL Research Technical Report NREL/TP-5500-60695 September 2014 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory

  1. Heating, ventilating, and air conditioning deactivation thermal analysis of PUREX Plant

    SciTech Connect (OSTI)

    Chen, W.W.; Gregonis, R.A.

    1997-08-01

    Thermal analysis was performed for the proposed Plutonium Uranium Extraction Plant exhaust system after deactivation. The purpose of the analysis was to determine if enough condensation will occur to plug or damage the filtration components. A heat transfer and fluid flow analysis was performed to evaluate the thermal characteristics of the underground duct system, the deep-bed glass fiber filter No. 2, and the high-efficiency particulate air filters in the fourth filter building. The analysis is based on extreme variations of air temperature, relative humidity, and dew point temperature using 15 years of Hanford Site weather data as a basis. The results will be used to evaluate the need for the electric heaters proposed for the canyon exhaust to prevent condensation. Results of the analysis indicate that a condition may exist in the underground ductwork where the duct temperature can lead or lag changes in the ambient air temperature. This condition may contribute to condensation on the inside surfaces of the underground exhaust duct. A worst case conservative analysis was performed assuming that all of the water is removed from the moist air over the inside surface of the concrete duct area in the fully developed turbulent boundary layer while the moist air in the free stream will not condense. The total moisture accumulated in 24 hours is negligible. Water puddling would not be expected. The results of the analyses agree with plant operating experiences. The filters were designed to resist high humidity and direct wetting, filter plugging caused by slight condensation in the upstream duct is not a concern. 19 refs., 2 figs.

  2. Thermodynamic model of a thermal storage air conditioning system with dynamic behavior

    SciTech Connect (OSTI)

    Fleming, E; Wen, SY; Shi, L; da Silva, AK

    2013-12-01

    A thermodynamic model was developed to predict transient behavior of a thermal storage system, using phase change materials (PCMs), for a novel electric vehicle climate conditioning application. The main objectives of the paper are to consider the system's dynamic behavior, such as a dynamic air flow rate into the vehicle's cabin, and to characterize the transient heat transfer process between the thermal storage unit and the vehicle's cabin, while still maintaining accurate solution to the complex phase change heat transfer. The system studied consists of a heat transfer fluid circulating between either of the on-board hot and cold thermal storage units, which we refer to as thermal batteries, and a liquid-air heat exchanger that provides heat exchange with the incoming air to the vehicle cabin. Each thermal battery is a shell-and-tube configuration where a heat transfer fluid flows through parallel tubes, which are surrounded by PCM within a larger shell. The system model incorporates computationally inexpensive semianalytic solution to the conjugated laminar forced convection and phase change problem within the battery and accounts for airside heat exchange using the Number of Transfer Units (NTUs) method for the liquid-air heat exchanger. Using this approach, we are able to obtain an accurate solution to the complex heat transfer problem within the battery while also incorporating the impact of the airside heat transfer on the overall system performance. The implemented model was benchmarked against a numerical study for a melting process and against full system experimental data for solidification using paraffin wax as the PCM. Through modeling, we demonstrate the importance of capturing the airside heat exchange impact on system performance, and we investigate system response to dynamic operating conditions, e.g., air recirculation. (C) 2013 Elsevier Ltd. All rights reserved.

  3. Performance of R-410A Alternative Refrigerants in a Reciprocating Compressor Designed for Air Conditioning Applications

    SciTech Connect (OSTI)

    Shrestha, Som S; Vineyard, Edward Allan; Mumpower, Kevin

    2016-01-01

    In response to environmental concerns raised by the use of refrigerants with high Global Warming Potential (GWP), the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) has launched an industry-wide cooperative research program, referred to as the Low-GWP Alternative Refrigerants Evaluation Program (AREP), to identify and evaluate promising alternative refrigerants for major product categories. After successfully completing the first phase of the program in December 2013, AHRI launched a second phase of the Low-GWP AREP in 2014 to continue research in areas that were not previously addressed, including refrigerants in high ambient conditions, refrigerants in applications not tested in the first phase, and new refrigerants identified since testing for the program began. Although the Ozone Depletion Potential of R-410A is zero, this refrigerant is under scrutiny due to its high GWP. Several candidate alternative refrigerants have already demonstrated low global warming potential. Performance of these low-GWP alternative refrigerants is being evaluated for Air conditioning and heat pump applications to ensure acceptable system capacity and efficiency. This paper reports the results of a series of compressor calorimeter tests conducted for the second phase of the AREP to evaluate the performance of R-410A alternative refrigerants in a reciprocating compressor designed for air conditioning systems. It compares performance of alternative refrigerants ARM-71A, L41-1, DR-5A, D2Y-60, and R-32 to that of R-410A over a wide range of operating conditions. The tests showed that, in general, cooling capacities were slightly lower (except for the R-32), but energy efficiency ratios (EER) of the alternative refrigerants were comparable to that of R-410A.

  4. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

  5. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----------------------------------------------------------------Chapter 7.2 (May 2014) 1 Strategic Sourcing Requirements Guiding Principles  Improving acquisition through strategic sourcing.  Taking advantage of purchasing opportunities by continually reviewing current needs against market conditions.  Requiring vendors to provide sufficient pricing usage, and performance data to enable the government to ensure we are receiving the best prices for commonly used goods and services. 

  6. An Analysis of Price Determination and Markups in the Air-Conditioning and Heating Equipment Industry

    SciTech Connect (OSTI)

    Dale, Larry; Millstein, Dev; Coughlin, Katie; Van Buskirk, Robert; Rosenquist, Gregory; Lekov, Alex; Bhuyan, Sanjib

    2004-01-30

    In this report we calculate the change in final consumer prices due to minimum efficiency standards, focusing on a standard economic model of the air-conditioning and heating equipment (ACHE) wholesale industry. The model examines the relationship between the marginal cost to distribute and sell equipment and the final consumer price in this industry. The model predicts that the impact of a standard on the final consumer price is conditioned by its impact on marginal distribution costs. For example, if a standard raises the marginal cost to distribute and sell equipment a small amount, the model predicts that the standard will raise the final consumer price a small amount as well. Statistical analysis suggest that standards do not increase the amount of labor needed to distribute equipment the same employees needed to sell lower efficiency equipment can sell high efficiency equipment. Labor is a large component of the total marginal cost to distribute and sell air-conditioning and heating equipment. We infer from this that standards have a relatively small impact on ACHE marginal distribution and sale costs. Thus, our model predicts that a standard will have a relatively small impact on final ACHE consumer prices. Our statistical analysis of U.S. Census Bureau wholesale revenue tends to confirm this model prediction. Generalizing, we find that the ratio of manufacturer price to final consumer price prior to a standard tends to exceed the ratio of the change in manufacturer price to the change in final consumer price resulting from a standard. The appendix expands our analysis through a typical distribution chain for commercial and residential air-conditioning and heating equipment.

  7. LiCl Dehumidifier LiBr absorption chiller hybrid air conditioning system with energy recovery

    DOE Patents [OSTI]

    Ko, Suk M.

    1980-01-01

    This invention relates to a hybrid air conditioning system that combines a solar powered LiCl dehumidifier with a LiBr absorption chiller. The desiccant dehumidifier removes the latent load by absorbing moisture from the air, and the sensible load is removed by the absorption chiller. The desiccant dehumidifier is coupled to a regenerator and the desiccant in the regenerator is heated by solar heated hot water to drive the moisture therefrom before being fed back to the dehumidifier. The heat of vaporization expended in the desiccant regenerator is recovered and used to partially preheat the driving fluid of the absorption chiller, thus substantially improving the overall COP of the hybrid system.

  8. The Oklahoma Field Test: Air-conditioning electricity savings from standard energy conservation measures, radiant barriers, and high-efficiency window air conditioners

    SciTech Connect (OSTI)

    Ternes, M.P.; Levins, W.P.

    1992-08-01

    A field test Involving 104 houses was performed in Tulsa, Oklahoma, to measure the air-conditioning electricity consumption of low-income houses equipped with window air conditioners, the reduction in this electricity consumption attributed to the installation of energy conservation measures (ECMS) as typically installed under the Oklahoma Weatherization Assistance Program (WAP), and the reduction achieved by the replacement of low-efficiency window air conditioners with high-efficiency units and the installation of attic radiant barriers. Air-conditioning electricity consumption and indoor temperature were monitored weekly during the pre-weatherization period (June to September 1988) and post-weatherization period (May to September 1989). House energy consumption models and regression analyses were used to normalize the air-conditioning electricity savings to average outdoor temperature conditions and the pre-weatherization indoor temperature of each house. The following conclusions were drawn from the study: (1) programs directed at reducing air-conditioning electricity consumption should be targeted at clients with high consumption to improve cost effectiveness; (2) replacing low-efficiency air conditioners with high-efficiency units should be considered an option in a weatherization program directed at reducing air-conditioning electricity consumption; (3) ECMs currently being installed under the Oklahoma WAP (chosen based on effectiveness at reducing space-heating energy consumption) should continue to be justified based on their space-heating energy savings potential only; and (4) attic radiant barriers should not be included in the Oklahoma WAP if alternatives with verified savings are available or until further testing demonstrates energy savings or other benefits in this typo of housing.

  9. The Oklahoma Field Test: Air-Conditioning Electricity Savings from Standard Energy Conservation Measures, Radiant Barriers, and High-Efficiency Window Air Conditioners

    SciTech Connect (OSTI)

    Ternes, M.P.

    1992-01-01

    A field test involving 104 houses was performed in Tulsa, Oklahoma, to measure the air-conditioning electricity consumption of low-income houses equipped with window air conditioners, the reduction in this electricity consumption attributed to the installation of energy conservation measures (ECMs) as typically installed under the Oklahoma Weatherization Assistance Program (WAP), and the reduction achieved by the replacement of low-efficiency window air conditioners with high-efficiency units and the installation of attic radiant barriers. Air-conditioning electricity consumption and indoor temperature were monitored weekly during the pre-weatherization period (June to September 1988) and post-weatherization period (May to September 1989). House energy consumption models and regression analyses were used to normalize the air-conditioning electricity savings to average outdoor temperature conditions and the pre-weatherization indoor temperature of each house. The average measured pre-weatherization air-conditioning electricity consumption was 1664 kWh/year ($119/year). Ten percent of the houses used less than 250 kWh/year, while another 10% used more than 3000 kWh/year. An average reduction in air-conditioning electricity consumption of 535 kWh/year ($38/year and 28% of pre-weatherization consumption) was obtained from replacement of one low-efficiency window air conditioner (EER less than 7.0) per house with a high-efficiency unit (EER greater than 9.0). For approximately the same cost, savings tripled to 1503 kWh/year ($107/year and 41% of pre-weatherization consumption) in those houses with initial air-conditioning electricity consumption greater than 2750 kWh/year. For these houses, replacement of a low-efficiency air conditioner with a high-efficiency unit was cost effective using the incremental cost of installing a new unit now rather than later; the average installation cost for these houses under a weatherization program was estimated to be $786. The

  10. Fuel-Free Compressed-Air Energy Storage: Fuel-Free, Ubiquitous Compressed-Air Energy Storage and Power Conditioning

    SciTech Connect (OSTI)

    2010-09-13

    GRIDS Project: General Compression has developed a transformative, near-isothermal compressed air energy storage system (GCAES) that prevents air from heating up during compression and cooling down during expansion. When integrated with renewable generation, such as a wind farm, intermittent energy can be stored in compressed air in salt caverns or pressurized tanks. When electricity is needed, the process is reversed and the compressed air is expanded to produce electricity. Unlike conventional compressed air energy storage (CAES) projects, no gas is burned to convert the stored high-pressure air back into electricity. The result of this breakthrough is an ultra-efficient, fully shapeable, 100% renewable and carbon-free power product. The GCAES™ system can provide high quality electricity and ancillary services by effectively integrating renewables onto the grid at a cost that is competitive with gas, coal and nuclear generation.

  11. Aggregated Modeling and Control of Air Conditioning Loads for Demand Response

    SciTech Connect (OSTI)

    Zhang, Wei; Lian, Jianming; Chang, Chin-Yao; Kalsi, Karanjit

    2013-06-21

    Demand response is playing an increasingly important role in the efficient and reliable operation of the electric grid. Modeling the dynamic behavior of a large population of responsive loads is especially important to evaluate the effectiveness of various demand response strategies. In this paper, a highly-accurate aggregated model is developed for a population of air conditioning loads. The model effectively includes statistical information of the population, systematically deals with load heterogeneity, and accounts for second-order dynamics necessary to accurately capture the transient dynamics in the collective response. Based on the model, a novel aggregated control strategy is designed for the load population under realistic conditions. The proposed controller is fully responsive and achieves the control objective without sacrificing end-use performance. The proposed aggregated modeling and control strategies are validated through realistic simulations using GridLAB-D. Extensive simulation results indicate that the proposed approach can effectively manage a large number of air conditioning systems to provide various demand response services, such as frequency regulation and peak load reduction.

  12. Table HC6.7 Air-Conditioning Usage Indicators by Number of Household Members, 2005

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Air-Conditioning Usage Indicators by Number of Household Members, 2005 Total........................................................................ 111.1 30.0 34.8 18.4 15.9 12.0 Do Not Have Cooling Equipment.......................... 17.8 5.4 5.3 2.7 2.5 2.0 Have Cooling Equipment...................................... 93.3 24.6 29.6 15.7 13.4 10.0 Use Cooling Equipment....................................... 91.4 24.0 29.1 15.5 13.2 9.7 Have Equipment But Do Not Use it......................

  13. Table HC9.6 Air Conditioning Characteristics by Climate Zone, 2005

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Air Conditioning Characteristics by Climate Zone, 2005 Million U.S. Housing Units Total......................................................................... 111.1 10.9 26.1 27.3 24.0 22.8 Do Not Have Cooling Equipment........................... 17.8 3.2 4.7 3.6 5.5 0.9 Have Cooling Equipment........................................ 93.3 7.7 21.4 23.7 18.5 21.9 Use Cooling Equipment......................................... 91.4 7.6 21.0 23.4 17.9 21.7 Have Equipment But Do Not Use

  14. Benefits of Leapfrogging to Superefficiency and Low Global Warming Potential Refrigerants in Room Air Conditioning

    SciTech Connect (OSTI)

    Shah, Nihar K.; Wei, Max; Letschert, Virginie; Phadke, Amol A.

    2015-10-01

    Hydrofluorocarbons (HFCs) emitted from uses such as refrigerants and thermal insulating foam, are now the fastest growing greenhouse gases (GHGs), with global warming potentials (GWP) thousands of times higher than carbon dioxide (CO2). Because of the short lifetime of these molecules in the atmosphere,1 mitigating the amount of these short-lived climate pollutants (SLCPs) provides a faster path to climate change mitigation than control of CO2 alone. This has led to proposals from Africa, Europe, India, Island States, and North America to amend the Montreal Protocol on Substances that Deplete the Ozone Layer (Montreal Protocol) to phase-down high-GWP HFCs. Simultaneously, energy efficiency market transformation programs such as standards, labeling and incentive programs are endeavoring to improve the energy efficiency for refrigeration and air conditioning equipment to provide life cycle cost, energy, GHG, and peak load savings. In this paper we provide an estimate of the magnitude of such GHG and peak electric load savings potential, for room air conditioning, if the refrigerant transition and energy efficiency improvement policies are implemented either separately or in parallel.

  15. Evaluating Membrane Processes for Air Conditioning, Highlights in Research and Development (Fact Sheet), NREL (National Renewable Energy Laboratory)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL compiles state-of-the-art review on membrane processes for air conditioning to identify future research opportunities. Researchers are pursuing alternatives to conventional heating, ventilating, and air-conditioning (HVAC) practices, especially cool- ing and dehumidification, because of high energy use, environmentally harmful refrigerants, and a need for better humidity control. Advancements in membrane technology enable new possibilities in this area. Membranes are traditionally used for

  16. PIA - Savannah River Site Management and Operating Contractor...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor ...

  17. Audit of the Contractor Incentive Program at the Nevada Operations...

    Office of Environmental Management (EM)

    the Contractor Incentive Program at the Nevada Operations Office, IG-0412 Audit of the Contractor Incentive Program at the Nevada Operations Office, IG-0412 Audit of the Contractor ...

  18. Authorize_Changes_Contractor_Work_Force_Restructuring_Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AuthorizeChangesContractorWorkForceRestructuringPolicy.pdf AuthorizeChangesContractorWorkForceRestructuringPolicy.pdf PDF icon AuthorizeChangesContractorWorkForceR...

  19. PARS II 104 Contractor Monthly Upload | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    104 Contractor Monthly Upload PARS II 104 Contractor Monthly Upload PDF icon PARS II 104 Contractor Monthly Upload More Documents & Publications PARS II TRAINING PARS II Training ...

  20. Working Capital for Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capital for Contractors Working Capital for Contractors Better Buildings Neighborhood Program Financing Peer Exchange Call: Working Capital for Contractors, Call Slides and Discussion Summary, August 30, 2012. Call Slides and Discussion Summary (673.52 KB) More Documents & Publications Streamline Service Delivery via Customer Communication and Contractor Coordination Focus Series: OREGON-On Bill Financing Program: On-Bill Financing Brings Lenders and Homeowners On Board Lessons from On-Bill

  1. Experimental investigation on the photovoltaic-thermal solar heat pump air-conditioning system on water-heating mode

    SciTech Connect (OSTI)

    Fang, Guiyin; Hu, Hainan; Liu, Xu

    2010-09-15

    An experimental study on operation performance of photovoltaic-thermal solar heat pump air-conditioning system was conducted in this paper. The experimental system of photovoltaic-thermal solar heat pump air-conditioning system was set up. The performance parameters such as the evaporation pressure, the condensation pressure and the coefficient of performance (COP) of heat pump air-conditioning system, the water temperature and receiving heat capacity in water heater, the photovoltaic (PV) module temperature and the photovoltaic efficiency were investigated. The experimental results show that the mean photovoltaic efficiency of photovoltaic-thermal (PV/T) solar heat pump air-conditioning system reaches 10.4%, and can improve 23.8% in comparison with that of the conventional photovoltaic module, the mean COP of heat pump air-conditioning system may attain 2.88 and the water temperature in water heater can increase to 42 C. These results indicate that the photovoltaic-thermal solar heat pump air-conditioning system has better performances and can stably work. (author)

  2. Contractor Sales Training | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sales Training Contractor Sales Training Better Buildings Neighborhood Program Workforce Peer Exchange Call: Contractor Sales Training, Call Slides and Discussion Summary, January 19, 2012. Call Slides and Discussion Summary (543.21 KB) More Documents & Publications Homeowner and Contractor Surveys Focus Series: Philadelphia Energyworks: In the City of Brotherly Love, Sharing Know-How Leads to Sustainability Better Buildings Training Toolkit

  3. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. This order cancels DOE O 3220.1A, DOE O 3220.4A, DOE O 3220.6A, and DOE O 3309.1A.

  4. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-29

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels Chapters I-III of DOE O 350.1 Chg 4

  5. contractors | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    contractors Supply Chain Management Center event highlights how small businesses can help NNSA carry out its missions The Supply Chain Management Center (SCMC) has been an important tool for NNSA to save taxpayer dollars. At the event on Feb. 18, NNSA leadership and the New Mexico congressional delegation were well represented. From left, Scott Bissen, SCMC Director; Rep. Steve Pearce (R-NM); NNSA Administrator

  6. High Efficiency Liquid-Desiccant Regenerator for Air Conditioning and Industrial Drying

    SciTech Connect (OSTI)

    Andrew Lowenstein

    2005-12-19

    Over 2 quads of fossil fuels are used each year for moisture removal. This includes industrial and agricultural processes where feedstocks and final products must be dried, as well as comfort conditioning of indoor spaces where the control of humidity is essential to maintaining healthy, productive and comfortable working conditions. Desiccants, materials that have a high affinity for water vapor, can greatly reduce energy use for both drying and dehumidification. An opportunity exists to greatly improve the competitiveness of advanced liquid-desiccant systems by increasing the efficiency of their regenerators. It is common practice within the chemical process industry to use multiple stage boilers to improve the efficiency of thermal separation processes. The energy needed to regenerate a liquid desiccant, which is a thermal separation process, can also be reduced by using a multiple stage boiler. In this project, a two-stage regenerator was developed in which the first stage is a boiler and the second stage is a scavenging-air regenerator. The only energy input to this regenerator is the natural gas that fires the boiler. The steam produced in the boiler provides the thermal energy to run the second-stage scavenging-air regenerator. This two-stage regenerator is referred to as a 1?-effect regenerator. A model of the high-temperature stage of a 1?-effect regenerator for liquid desiccants was designed, built and successfully tested. At nominal operating conditions (i.e., 2.35 gpm of 36% lithium chloride solution, 307,000 Btu/h firing rate), the boiler removed 153 lb/h of water from the desiccant at a gas-based efficiency of 52.9 % (which corresponds to a COP of 0.95 when a scavenging-air regenerator is added). The steam leaving the boiler, when condensed, had a solids concentration of less than 10 ppm. This low level of solids in the condensate places an upper bound of about 6 lb per year for desiccant loss from the regenerator. This low loss will not create

  7. contractor

    National Nuclear Security Administration (NNSA)

    demonstrated highly effective leadership in 2014 while directing the NMSSUP Phase II Transition to OperationsReadiness Verification team. Randy's efforts assured the performance...

  8. Evaluation Framework and Analyses for Thermal Energy Storage Integrated with Packaged Air Conditioning

    SciTech Connect (OSTI)

    Kung, F.; Deru, M.; Bonnema, E.

    2013-10-01

    Few third-party guidance documents or tools are available for evaluating thermal energy storage (TES) integrated with packaged air conditioning (AC), as this type of TES is relatively new compared to TES integrated with chillers or hot water systems. To address this gap, researchers at the National Renewable Energy Laboratory conducted a project to improve the ability of potential technology adopters to evaluate TES technologies. Major project outcomes included: development of an evaluation framework to describe key metrics, methodologies, and issues to consider when assessing the performance of TES systems integrated with packaged AC; application of multiple concepts from the evaluation framework to analyze performance data from four demonstration sites; and production of a new simulation capability that enables modeling of TES integrated with packaged AC in EnergyPlus. This report includes the evaluation framework and analysis results from the project.

  9. Expert system for the design of heating, ventilating, and air-conditioning systems. Master's thesis

    SciTech Connect (OSTI)

    Camejo, P.J.

    1989-12-01

    Expert systems are computer programs that seek to mimic human reason. An expert system shelf, a software program commonly used for developing expert systems in a relatively short time, was used to develop a prototypical expert system for the design of heating, ventilating, and air-conditioning (HVAC) systems in buildings. Because HVAC design involves several related knowledge domains, developing an expert system for HVAC design requires the integration of several smaller expert systems known as knowledge bases. A menu program and several auxiliary programs for gathering data, completing calculations, printing project reports, and passing data between the knowledge bases are needed and have been developed to join the separate knowledge bases into one simple-to-use program unit.

  10. Advantages of air conditioning and supercharging an LM6000 gas turbine inlet

    SciTech Connect (OSTI)

    Kolp, D.A.; Flye, W.M.; Guidotti, H.A.

    1995-07-01

    Of all the external factors affecting a gas turbine, inlet pressure and temperature have the greatest impact on performance. The effect of inlet temperature variations is especially pronounced in the new generation of high-efficiency gas turbines typified by the 40 MW GE LM6000. A reduction of 50 F (28 C) in inlet temperature can result in a 30 percent increase in power and a 4.5 percent improvement in heat rate. An elevation increase to 5,000 ft (1,524 m) above sea level decreases turbine output 17 percent; conversely supercharging can increase output more than 20 percent. This paper addresses various means of heating, cooling and supercharging LM6000 inlet air. An economic model is developed and sample cases are cited to illustrate the optimization of gas turbine inlet systems, taking into account site conditions, incremental equipment cost and subsequent performance enhancement.

  11. New Automotive Air Conditioning System Simulation Tool Developed in MATLAB/Simulink

    SciTech Connect (OSTI)

    Kiss, T.; Chaney, L.; Meyer, J.

    2013-07-01

    Further improvements in vehicle fuel efficiency require accurate evaluation of the vehicle's transient total power requirement. When operated, the air conditioning (A/C) system is the largest auxiliary load on a vehicle; therefore, accurate evaluation of the load it places on the vehicle's engine and/or energy storage system is especially important. Vehicle simulation software, such as 'Autonomie,' has been used by OEMs to evaluate vehicles' energy performance. A transient A/C simulation tool incorporated into vehicle simulation models would also provide a tool for developing more efficient A/C systems through a thorough consideration of the transient A/C system performance. The dynamic system simulation software Matlab/Simulink was used to develop new and more efficient vehicle energy system controls. The various modeling methods used for the new simulation tool are described in detail. Comparison with measured data is provided to demonstrate the validity of the model.

  12. Japanese power electronics inverter technology and its impact on the American air conditioning industry

    SciTech Connect (OSTI)

    Ushimaru, Kenji.

    1990-08-01

    Since 1983, technological advances and market growth of inverter- driven variable-speed heat pumps in Japan have been dramatic. The high level of market penetration was promoted by a combination of political, economic, and trade policies in Japan. A unique environment was created in which the leading domestic industries-- microprocessor manufacturing, compressors for air conditioning and refrigerators, and power electronic devices--were able to direct the development and market success of inverter-driven heat pumps. As a result, leading US variable-speed heat pump manufacturers should expect a challenge from the Japanese producers of power devices and microprocessors. Because of the vertically-integrated production structure in Japan, in contrast to the out-sourcing culture of the United States, price competition at the component level (such as inverters, sensors, and controls) may impact the structure of the industry more severely than final product sales. 54 refs., 47 figs., 1 tab.

  13. Streamline Service Delivery via Customer Communication and Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Streamline Service Delivery via Customer Communication and Contractor Coordination Streamline Service Delivery via Customer Communication and Contractor Coordination Better ...

  14. Improve client-contractor working relationships under PSM

    SciTech Connect (OSTI)

    Early, W.F. II [Early Consulting, Houston, TX (United States)

    1996-10-01

    Many operating companies rely on engineering/procurement/construction (EPC) contractors to provide needed services during expansions and other capital project ventures. These service providers are obligated to work under the same process safety management (PSM) guidelines as the operating company. So what are the responsibilities for the operating company (client), contractor and others under PSM? Following the checklist, EPC contractors and operating companies can develop and assign process safety responsibilities early in project planning. Under these conditions, all involved project parties are fully aware of their individual obligations as mandated by 29 CFR 1910.119 Process Safety Management of Highly Hazardous Chemicals (OSHA PSM). Fully disclosing individual party responsibilities ensures dialogue between the client and the EPC contractor and other involved service providers. Clearly defining and communicating project responsibilities may influence project execution and associated costs considerably. The paper describes the project planning under PSM, PSM elements, process safety information, process hazard analysis, operating procedures, training, contractor programs, pre-startup safety review, mechanical integrity, incident investigations, emergency planning and response, and compliance audits.

  15. NREL's Energy-Saving Technology for Air Conditioning Cuts Peak Power Loads Without Using Harmful Refrigerants (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-07-01

    This fact sheet describes how the DEVAP air conditioner was invented, explains how the technology works, and why it won an R&D 100 Award. Desiccant-enhanced evaporative (DEVAP) air-conditioning will provide superior comfort for commercial buildings in any climate at a small fraction of the electricity costs of conventional air-conditioning equipment, releasing far less carbon dioxide and cutting costly peak electrical demand by an estimated 80%. Air conditioning currently consumes about 15% of the electricity generated in the United States and is a major contributor to peak electrical demand on hot summer days, which can lead to escalating power costs, brownouts, and rolling blackouts. DEVAP employs an innovative combination of air-cooling technologies to reduce energy use by up to 81%. DEVAP also shifts most of the energy needs to thermal energy sources, reducing annual electricity use by up to 90%. In doing so, DEVAP is estimated to cut peak electrical demand by nearly 80% in all climates. Widespread use of this cooling cycle would dramatically cut peak electrical loads throughout the country, saving billions of dollars in investments and operating costs for our nation's electrical utilities. Water is already used as a refrigerant in evaporative coolers, a common and widely used energy-saving technology for arid regions. The technology cools incoming hot, dry air by evaporating water into it. The energy absorbed by the water as it evaporates, known as the latent heat of vaporization, cools the air while humidifying it. However, evaporative coolers only function when the air is dry, and they deliver humid air that can lower the comfort level for building occupants. And even many dry climates like Phoenix, Arizona, have a humid season when evaporative cooling won't work well. DEVAP extends the applicability of evaporative cooling by first using a liquid desiccant-a water-absorbing material-to dry the air. The dry air is then passed to an indirect evaporative

  16. Modelica Library for Building Heating, Ventilation and Air-Conditioning Systems

    SciTech Connect (OSTI)

    Wetter, Michael

    2009-06-17

    This paper presents a freely available Modelica library for building heating, ventilation and air conditioning systems. The library is based on the Modelica.Fluid library. It has been developed to support research and development of integrated building energy and control systems. The primary applications are controls design, energy analysis and model-based operation. The library contains dynamic and steady-state component models that are applicable for analyzing fast transients when designing control algorithms and for conducting annual simulations when assessing energy performance. For most models, dimensional analysis is used to compute the performance for operating points that differ from nominal conditions. This allows parameterizing models in the absence of detailed geometrical information which is often impractical to obtain during the conceptual design phase of building systems. In the first part of this paper, the library architecture and the main classes are described. In the second part, an example is presented in which we implemented a model of a hydronic heating system with thermostatic radiator valves and thermal energy storage.

  17. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, supersedes DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

  18. Global warming impacts of ozone-safe refrigerants and refrigeration, heating, and air-conditioning technologies

    SciTech Connect (OSTI)

    Fischer, S.; Sand, J.; Baxter, V.

    1997-12-01

    International agreements mandate the phase-out of many chlorine containing compounds that are used as the working fluid in refrigeration, air-conditioning, and heating equipment. Many of the chemical compounds that have been proposed, and are being used in place of the class of refrigerants eliminated by the Montreal Protocol are now being questioned because of their possible contributions to global warming. Natural refrigerants are put forth as inherently superior to manufactured refrigerants because they have very low or zero global warming potentials (GWPs). Questions are being raised about whether or not these manufactured refrigerants, primarily hydrofluorocarbons (HFCs), should be regulated and perhaps phased out in much the same manner as CFCs and HCFCs. Several of the major applications of refrigerants are examined in this paper and the results of an analysis of their contributions to greenhouse warming are presented. Supermarket refrigeration is shown to be an application where alternative technologies have the potential to reduce emissions of greenhouse gases (GHG) significantly with no clear advantage to either natural or HFC refrigerants. Mixed results are presented for automobile air conditioners with opportunities to reduce GHG emissions dependent on climate and comfort criteria. GHG emissions for hermetic and factory built systems (i.e. household refrigerators/freezers, unitary equipment, chillers) are shown to be dominated by energy use with much greater potential for reduction through efficiency improvements than by selection of refrigerant. The results for refrigerators also illustrate that hydrocarbon and carbon dioxide blown foam insulation have lower overall effects on GHG emissions than HFC blown foams at the cost of increased energy use.

  19. Guide to Air Sealing

    SciTech Connect (OSTI)

    2011-02-01

    Air sealing is one of the most cost-effective ways to improve the comfort and energy efficiency of your home. Hire a certified professional contractor for best results.

  20. Energy Savings and Economics of Advanced Control Strategies for Packaged Air-Conditioning Units with Gas Heat

    SciTech Connect (OSTI)

    Wang, Weimin; Katipamula, Srinivas; Huang, Yunzhi; Brambley, Michael R.

    2011-12-31

    Pacific Northwest National Laboratory (PNNL) with funding from the U.S. Department of Energy's Building Technologies Program (BTP) evaluated a number of control strategies that can be implemented in a controller, to improve the operational efficiency of the packaged air conditioning units. The two primary objectives of this research project are: (1) determine the magnitude of energy savings achievable by retrofitting existing packaged air conditioning units with advanced control strategies not ordinarily used for packaged units and (2) estimating what the installed cost of a replacement control with the desired features should be in various regions of the U.S. This document reports results of the study.

  1. Energy-Efficient Supermarket Heating, Ventilation, and Air Conditioning in Humid Climates in the United States

    SciTech Connect (OSTI)

    Clark, J.

    2015-03-01

    Supermarkets are energy-intensive buildings that consume the greatest amount of electricity per square foot of building of any building type in the United States and represent 5% of total U.S. commercial building primary energy use (EIA 2005). Refrigeration and heating, ventilation, and air-conditioning (HVAC) systems are responsible for a large proportion of supermarkets’ total energy use. These two systems sometimes work together and sometimes compete, but the performance of one system always affects the performance of the other. To better understand these challenges and opportunities, the Commercial Buildings team at the National Renewable Energy Laboratory investigated several of the most promising strategies for providing energy-efficient HVAC for supermarkets and quantified the resulting energy use and costs using detailed simulations. This research effort was conducted on behalf of the U.S. Department of Energy (DOE) Commercial Building Partnerships (CBP) (Baechler et al. 2012; Parrish et al. 2013; Antonopoulos et al. 2014; Hirsch et al. 2014). The goal of CBP was to reduce energy use in the commercial building sector by creating, testing, and validating design concepts on the pathway to net zero energy commercial buildings. Several CBP partners owned or operated buildings containing supermarkets and were interested in optimizing the energy efficiency of supermarket HVAC systems in hot-humid climates. These partners included Walmart, Target, Whole Foods Market, SUPERVALU, and the Defense Commissary Agency.

  2. Programs: Operating as a Prime Contractor

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Program Sustainability Peer Exchange Call: Operating as a Prime Contractor, Call Slides and Discussion Summary, May 9, 2013.

  3. Transactions, Technology & Contractor Human Resources | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Panel Technician | Credit: DOE Archives Solar Panel Technician | Credit: DOE Archives Offices of the Deputy General Counsel for Transactions, Technology, & Contractor Human...

  4. Solar Contractor Licensing | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    < Back Eligibility InstallersContractors Savings Category Solar - Passive Solar Water Heat Solar Space Heat Solar Thermal Electric Solar Thermal Process Heat Solar Photovoltaics...

  5. Five Steps to a Profitable Contractor Base

    Broader source: Energy.gov [DOE]

    Presents an introduction to Session 2: Five Steps to a Profitable Contractor Base. From Residential Energy Efficiency Solutions: From Innovation to Market Transformation, July 10, 2012

  6. Contractor-Funded Incentives | Department of Energy

    Energy Savers [EERE]

    Contractor-Funded Incentives Better Buildings Residential Network Workforce Business ... More Documents & Publications Energy Advising Services in the Post-ARRA World Strategies ...

  7. Federal, Contractor, or Subcontractor | Department of Energy

    Office of Environmental Management (EM)

    142014 Listing of SuspectCounterfeit Coordinators by SiteProgram Secretarial Office (PSO) and title (Federal, Contractor, or Subcontractor). This listing includes email and...

  8. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Attached is Acquisition Letter 2013-07, which provides suggested modification language. (The Final Rule's revisions are administrative in nature. Regarding costs contractors have ...

  9. Hanford Contractor Receives Awards for Safety

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – A Hanford site contractor supporting EM’s cleanup program has again received a prestigious safety award from DOE’s Voluntary Protection Program (VPP).

  10. Building America Expert Meeting: Transitioning Traditional HVAC Contractors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Whole House Performance Contractors | Department of Energy Transitioning Traditional HVAC Contractors to Whole House Performance Contractors Building America Expert Meeting: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the

  11. Microsoft Word - Attachment J-1 Covered Site Contractors and Sub-Contractors (Mod 003).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Section J Workers' Compensation Claims Services Penser North America, Inc. J-1-1 ATTACHMENT J.1 COVERED SITE CONTRACTORS/SUB-CONTRACTORS Current Covered Prime Contractors and their Covered Sub-Contractors: HPM Corporation (HPMC) (10/1/2012 - present) HPMC Covered Subs: Computer Science Corp (CSC) Advanced Technologies & Laboratories International, Inc. (ATL) (5/16/2005- present) No subcontractors Battelle Memorial Institute/Pacific Northwest National Laboratory (PNNL) No subcontractors

  12. Microsoft Word - Attachment J-1 Covered Site Contractors and Sub-Contractors.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J-1-1 ATTACHMENT J.1 COVERED SITE CONTRACTORS/SUB-CONTRACTORS Covered Prime Contractors And Their Covered Sub-Contractors: HPM Corporation (HPMC) (10/1/2012 - present) HPMC Covered Subs: Computer Science Corp (CSC) Advanced Technologies and Laboratories International, Inc. (ATL) (5/16/2005- present) No subcontractors Battelle Memorial Institute/Pacific Northwest National Laboratory (PNNL) No subcontractors CH2M Hill Plateau Remediation Company (CHPRC) (10/01/2008 - present) No subcontractors

  13. Commercialization of air conditioning heat pump/water heater. Final technical report, Volume 1: Transmittal documents; Executive summary; Project summary

    SciTech Connect (OSTI)

    1996-01-30

    This is the final technical report on a commercialization project for an air conditioning heat pump water heater. The objective of the project was to produce a saleable system which would be economically competitive with natural gas and cost effective with regard to initial cost versus annual operating costs. The development and commercialization of the system is described.

  14. Investigation of techniques to improve continuous air monitors under conditions of high dust loading in environmental setting

    SciTech Connect (OSTI)

    Huang, Suilou; Schery, Stephen D.; Rodgers, John

    2000-06-01

    Improvement in understanding the deposition of ambient dust particles on environmental continuous air monitor (ECAM) filters, reduction of the alpha-particle interference of radon progeny and other radioactive aerosols in different particle size ranges on filters, and development of ECAMs with increased sensitivity under dusty outdoor conditions.

  15. Study of Air Ingress Across the Duct During the Accident Conditions

    SciTech Connect (OSTI)

    Hassan, Yassin

    2013-05-06

    The goal of this project is to study the fundamental physical phenomena associated with air ingress in very high temperature reactors (VHTRs). Air ingress may occur due to a rupture of primary piping and a subsequent breach in the primary pressure boundary in helium-cooled and graphite-moderated VHTRs. Significant air ingress is a concern because it introduces potential to expose the fuel, graphite support rods, and core to a risk of severe graphite oxidation. Two of the most probable air ingress scenarios involve rupture of a control rod or fuel access standpipe, and rupture in the main coolant pipe on the lower part of the reactor pressure vessel. Therefore, establishing a fundamental understanding of air ingress phenomena is critical in order to rationally evaluate safety of existing VHTRs and develop new designs that minimize these risks. But despite this importance, progress toward development these predictive capabilities has been slowed by the complex nature of the underlying phenomena. The combination of inter-diffusion among multiple species, molecular diffusion, natural convection, and complex geometries, as well as the multiple chemical reactions involved, impose significant roadblocks to both modeling and experiment design. The project team will employ a coordinated experimental and computational effort that will help gain a deeper understanding of multiphased air ingress phenomena. This project will enhance advanced modeling and simulation methods, enabling calculation of nuclear power plant transients and accident scenarios with a high degree of confidence. The following are the project tasks: Perform particle image velocimetry measurement of multiphase air ingresses; and, Perform computational fluid dynamics analysis of air ingress phenomena.

  16. Facility Security Officer Contractor Toolcart

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plans take approximately 5 days to approve. If access to Kirtland Air Force Base is needed, then these plans must be submitted 30 days in advance of the planned visit start date. ...

  17. ASME N511-19XX, Standard for periodic in-service testing of nuclear air treatment, heating, ventilating and air conditioning systems

    SciTech Connect (OSTI)

    1997-08-01

    A draft version of the Standard is presented in this document. The Standard covers the requirements for periodic in-service testing of nuclear safety-related air treatment, heating, ventilating, and air conditioning systems in nuclear facilities. The Standard provides a basis for the development of test programs and does not include acceptance criteria, except in cases where the results of one test influence the performance of other tests. The Standard covers general inspection and test requirements, reference values, inspection and test requirements, generic tests, acceptance criteria, in-service test requirements, testing following an abnormal incident, corrective action requirements, and quality assurance. Mandatory appendices provide a visual inspection checklist and four test procedures. Non-mandatory appendices provide additional information and guidance on mounting frame pressure leak test procedure, corrective action, challenge gas substitute selection criteria, and test program development. 8 refs., 10 tabs.

  18. 2014-06-23 Issuance: Energy Conservation Standards for Walk-in Coolers and Freezers; Air-Conditioning, Heating, & Refrigeration Institute Petition for Reconsideration

    Broader source: Energy.gov [DOE]

    This document is the agency response to the Energy Conservation Standards for Walk-in Coolers and Freezers; Air-Conditioning, Heating, & Refrigeration Institute Petition for Reconsideration.

  19. Spotlight on Austin, Texas: Let Your Contractor Be Your Guide...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Let Your Contractor Be Your Guide for Big Rewards Spotlight on Austin, Texas: Let Your Contractor Be Your Guide for Big Rewards Spotlight on Austin, Texas: Let Your Contractor Be ...

  20. Communication to All Department of Energy Contractors

    Broader source: Energy.gov [DOE]

    Information is provided herein that is to be disseminated to all Department of Energy (DOE) prime Contractors. Please direct all of your Contracting Officers to electronically dispatch the information to all their prime contractors immediately. If an electronic message of non-deliverability is received, Contracting Officers should attempt delivery by an alternate means of delivery. Procurement Directors are directed to provide confirmation to Berta Schreiber and Richard Langston by 9 a.m. EDT July 31, 2012, that they have provided notification to their prime contractors.

  1. Building America Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-10-01

    In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. Four air-based HVAC distribution systems were assessed:-a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms. The relative ability of each system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

  2. Better Buildings: Workforce, Spotlight on Maine: Contractor Sales...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy...

  3. Trends in Contractor Conversion Rates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings -- Concierge Programs for Contractors -- They're Not Just for Consumers anymore Programs and Contractors -Top Tips for Successful Relationships (101) Spotlight on ...

  4. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They ...

  5. Employee of Savannah River Site Contractor Recognized as Exemplary...

    Office of Environmental Management (EM)

    Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health ...

  6. Contractor Rating and Feedback Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rating and Feedback Systems Contractor Rating and Feedback Systems Better Buildings Residential Workforce Business Partners Peer Exchange Call Series: Contractor Rating and ...

  7. ORAU Wins DOE Facility Management Contractor Small Business Achievemen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year September ...

  8. Diverse Array of Career Resources Help EM Contractor Employees...

    Office of Environmental Management (EM)

    with EM, Professional Services of America, Inc. (PSA) oper- ates the Contractor Transition Service Program. Its services are available to contractor employees across the EM...

  9. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Energy Savers [EERE]

    ... Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and ...

  10. POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS...

    Energy Savers [EERE]

    POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING...

  11. Programs and Contractors -Top Tips for Successful Relationships...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programs and Contractors -Top Tips for Successful Relationships (101) Programs and Contractors -Top Tips for Successful Relationships (101) Better Buildings Residential Network ...

  12. Update to M&O Contractor Model Subcontract entitled "Standard...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    M&O Contractor Model Subcontract entitled "Standard Research Subcontract (Educational Institution or Nonprofit Organization)" Update to M&O Contractor Model Subcontract entitled ...

  13. Nevada National Security Site contractor receives safety recertificati...

    National Nuclear Security Administration (NNSA)

    Nevada National Security Site contractor receives safety recertification for 5th straight ... and operating contractor for the Nevada National Security Site, continues to ...

  14. Programs: Operating as a Prime Contractor | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programs: Operating as a Prime Contractor Better Buildings Residential Network Program Sustainability Peer Exchange Call: Operating as a Prime Contractor, Call Slides and ...

  15. New Idaho Cleanup Project Contractor Unveils Management Team...

    Office of Environmental Management (EM)

    Idaho Cleanup Project Contractor Unveils Management Team New Idaho Cleanup Project Contractor Unveils Management Team April 27, 2016 - 12:35pm Addthis IDAHO FALLS, Idaho - EM's new ...

  16. Employee-Focused Structure Helps Produce Upgrades for Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employee-Focused Structure Helps Produce Upgrades for Contractor Employee-Focused Structure Helps Produce Upgrades for Contractor Photo of a young man sitting on a couch, looking ...

  17. Federal and Contractor Employee Roles in the Federal Workplace...

    Energy Savers [EERE]

    and Contractor Employee Roles in the Federal Workplace: New DOE Acquisition Guide Chapter 37.114 Federal and Contractor Employee Roles in the Federal Workplace: New DOE Acquisition ...

  18. DOE Seeks Input On Addressing Contractor Pension and Medical...

    Office of Environmental Management (EM)

    the increasing costs and liabilities of contractor employee pension and medical benefits. ... contractor employee pension and medical benefits to current employees and retirees. ...

  19. Driving Demand: Working With and Learning from Contractors

    Broader source: Energy.gov [DOE]

    This webinar covered how to work with and learn from contractors as well as NYSERDA's lessons learned in their contractor experiences.

  20. Policy Flash: 2013-52 Contractor Legal Management Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Questions concerning this policy...

  1. Policy Flash 2013-77 Contractor Performance Information | Department...

    Energy Savers [EERE]

    Policy Flash 2013-77 Contractor Performance Information Policy Flash 2013-77 Contractor Performance Information Questions concerning this policy flash should be directed to Barbara...

  2. Department of Energy Honors Hanford Site Contractor for Employee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Contractor for Employee Involvement and Management Leadership in Safety and Health Department of Energy Honors Hanford Site Contractor for Employee Involvement and...

  3. Performance and evaluation of gas engine driven rooftop air conditioning equipment at the Willow Grove (PA) Naval Air Station. Interim report, 1992 cooling season

    SciTech Connect (OSTI)

    Armstrong, P.R.; Conover, D.R.

    1993-05-01

    In a field evaluation conducted for the US Department of Energy (DOE) Office of Federal Energy Management Program (FEMP), the Pacific Northwest Laboratory (PNL) examined the performance of a new US energy-related technology under the FEMP Test Bed Demonstration Program. The technology was a 15-ton natural gas engine driven roof top air conditioning unit. Two such units were installed on a naval retail building to provide space conditioning to the building. Under the Test Bed Demonstration Program, private and public sector interests are focused to support the installation and evaluation of new US technologies in the federal sector. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) with DOE were the American Gas Cooling Center, Philadelphia Electric Company, Thermo King Corporation, and the US Naval Air Station at Willow Grove, Pennsylvania. Equipment operating and service data as well as building interior and exterior conditions were secured for the 1992 cooling season. Based on a computer assessment of the building using standard weather data, a comparison was made with the energy and operating costs associated with the previous space conditioning system. Based on performance during the 1992 cooling season and adjusted to a normal weather year, the technology will save the site $6,000/yr in purchased energy costs. An additional $9,000 in savings due to electricity demand ratchet charge reductions will also be realized. Detailed information on the technology, the installation, and the results of the technology test are provided to illustrate the advantages to the federal sector of using this technology. A history of the CRADA development process is also reported.

  4. List of Contractors to Support Anthrax Remediation

    SciTech Connect (OSTI)

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14

    This document responds to a need identified by private sector businesses for information on contractors that may be qualified to support building remediation efforts following a wide-area anthrax release.

  5. CRAD, NNSA- Evaluating Contractor Assurance Systems

    Broader source: Energy.gov [DOE]

    CRAD for Evaluating Contractor Assurance Systems. Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  6. Hiring Qualified Contractors | Department of Energy

    Office of Environmental Management (EM)

    Be absolutely sure the contractor you consider hiring is qualified, honest, and registered with the State-before you sign a contract or make a down payment. Federal, State, and ...

  7. Magazine Bestows Safety Award on EM Contractor

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – A woman-owned small business prime contractor to EM’s Office of River Protection has been named one of America’s safest companies for 2013 by EHS Today magazine.

  8. Energy Department retains INL contractor until 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INL News Release FOR IMMEDIATE RELEASE October 20, 2008 NEWS MEDIA CONTACT: Nicole Stricker, 208-526-5955 nicole.stricker@inl.gov Energy Department retains INL contractor until 2014 IDAHO FALLS -- The U.S. Department of Energy has decided to retain its Idaho National Laboratory contractor for the duration of the 10-year contract, which means Battelle Energy Alliance will continue to run INL through September 2014. After concluding a special assessment mandated by BEA's 2005 contract, DOE

  9. DOE Contractor Work Force Restructuring Approval Thresholds

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can make decision bit must notify DOE of intent of restructuring 101-200 employees DOE/NNSA field office is authorized to provide approval 201-500 employees LM is authorized to provide approval and NNSA Administrator is authorized to provide approval for NNSA work force restructurings in consultation with LM 501 and above employees Under Secretary/NNSA Administrator approval required

  10. Lab contractor awards LANL Foundation $3 million

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor awards LANL Foundation $3 million Lab contractor awards LANL Foundation $3 million To provide educational enrichment and educational outreach funding for a wide variety of education programs in the seven Northern New Mexico counties. October 29, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma

  11. Staff and Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Staff and Contractors Staff and Contractors Watch the video above to hear a message from Secretary Moniz, highlighting the FY 2016 budget request for the Department of Energy and his appreciation for the vital mission and dedicated employees of the Department. As referenced in the video, employees are encouraged to visit the Department's website to view the full FY 2016 budget presentation, which proposes approximately $30 billion to support nuclear security, clean energy, environmental cleanup,

  12. Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-09-29

    To ensure that contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships; that contractor relations/human resources specialists achieve consultations with management and operating contractors; and that appropriate labor standards are included in DOE/NNSA contracts and subcontracts. Cancels Chapters I-III of DOE O 350.1 Chg 4. Does not cancel other directives.

  13. Air Conditioner Regional Standards Brochure

    Broader source: Energy.gov [DOE]

    DOE has adopted energy conservation standards for split-system air conditioners that vary depending on when and where a unit is installed. This brochure is designed to provide information about the new standards to distributors, contractors (installers), and consumers.

  14. Independent Oversight Review, Department of Energy Contractor- August 2000

    Broader source: Energy.gov [DOE]

    Review of Department of Energy Contractor Occupational Medicine Programs from December 1998 to June 1999

  15. Strategies for Building Contractor Interest in Program Participation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Building Contractor Interest in Program Participation Strategies for Building Contractor Interest in Program Participation Better Buildings Residential Network Workforce / Business Partners Peer Exchange Call: Strategies for Building Contractor Interest in Program Participation, Call Slides and Summary, August 22, 2013, This workforce/business partner peer exchange call discussed strategies for building contractor interest in program participation. Call Slides and

  16. Investigation of Techniques to Improve Continuous Air Monitors Under Conditions of High Dust Loading in Environmental Settings

    SciTech Connect (OSTI)

    Suilou Huang; Stephen D. Schery; John C. Rodgers

    2002-07-23

    A number of DOE facilities, such as the Los Alamos National Laboratory (LANL) and the Waste Isolation Pilot Plant (WIPP), use alpha-particle environmental continuous air monitors (ECAMs) to monitor air for unwanted releases of radioactive aerosols containing such materials as plutonium and uranium. High sensitivity, ease of operation, and lack of false alarms are all important for ECAMs. The object of the project was to conduct investigations to improve operation of ECAMs, particularly under conditions where a lot of nonradioactive dust may be deposited on the filters (conditions of high dust loading). The presence of such dust may increase the frequency with which filters must be changed and can lead to an increased incidence of false alarms due to deteriorated energy resolution and response specificity to the radionuclides of interest. A major finding of the investigation, not previously documented, was that under many conditions thick layers of underlying nonradioactive dust do not decrease energy resolution and specificity for target radionuclides if the radioactive aerosol arrives as a sudden thin burst deposit, as commonly occurs in the early-warning alarm mode. As a result, operators of ECAMs may not need to change filters as often as previously thought and have data upon which to base more reliable operating procedures.

  17. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: FINAL RULE

    Broader source: Energy.gov [DOE]

    The Department has issued a Final Rule revising the existing contractor regulations covering contractor legal management requirements at 10 C.F.R. 719 (Federal Register May 3, 2013; http://www.gpo.gov/fdsys/pkg/FR-2013-05-03/pdf/2013-10485.pdf). One unusual aspect of the Final Rule is that it requires Contracting Officers to attempt to execute bilateral modifications to existing affected contracts to apply the Final Rule's revisions to those contracts. We will issue an Acquisition Letter shortly with suggested contract modification language. (The Final Rule's revisions "… are designed to clarify and streamline existing requirements, improve efficiency of contractor legal management, and facilitate oversight over the expenditure of taxpayer dollars." The contract modifications will state the revisions will only apply to costs incurred from date the bilateral modifications are executed forward. The revisions are administrative in nature. Regarding costs contractors have not yet incurred, the revisions could have been communicated to contractors without using a Final Rule to incorporate them into current contracts. Consequently, the modifications do not require equitable adjustments.)

  18. Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder

    SciTech Connect (OSTI)

    Kerrigan, P.

    2014-03-01

    BSC worked directly with the David Weekley Homes - Houston division to redesign three floor plans in order to locate the HVAC system in conditioned space. The purpose of this project is to develop a cost effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses. This is in preparation for the upcoming code changes in 2015. The builder wishes to develop an upgrade package that will allow for a seamless transition to the new code mandate. The following research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.

  19. Trends in Contractor Conversion Rates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Conversion Rates Trends in Contractor Conversion Rates Better Buildings Residential Network Workforce / Business Partners Peer Exchange Call Series: Trends in Contractor Conversion Rates, Call Slides and Discussion Summary, December 5, 2013. Call Slides and Discussion Summary (1.12 MB) More Documents & Publications Better Buildings -- Concierge Programs for Contractors -- They're Not Just for Consumers anymore Programs and Contractors -Top Tips for Successful Relationships! (101)

  20. Energy Savings Potential and Research, Development, & Demonstration Opportunities for Residential Building Heating, Ventilation, and Air Conditioning Systems

    SciTech Connect (OSTI)

    Goetzler, William; Zogg, Robert; Young, Jim; Schmidt, Justin

    2012-10-01

    This report is an assessment of 135 different heating, ventilation, and air-conditioning (HVAC) technologies for U.S. residential buildings to identify and provide analysis on 19 priority technology options in various stages of development. The analyses include an estimation of technical energy-savings potential, descriptions of technical maturity, descriptions of non-energy benefits, descriptions of current barriers for market adoption, and descriptions of the technology's applicability to different building or HVAC equipment types. From these technology descriptions, are suggestions for potential research, development and demonstration (RD&D) initiatives that would support further development of the priority technology options.

  1. Energy Savings Potential and Research, Development, & Demonstration Opportunities for Commercial Building Heating, Ventilation, and Air Conditioning Systems

    SciTech Connect (OSTI)

    none,

    2011-09-01

    This report covers an assessment of 182 different heating, ventilation, and air-conditioning (HVAC) technologies for U.S. commercial buildings to identify and provide analysis on 17 priority technology options in various stages of development. The analyses include an estimation of technical energy-savings potential, description of technical maturity, description of non-energy benefits, description of current barriers for market adoption, and description of the technology’s applicability to different building or HVAC equipment types. From these technology descriptions, are suggestions for potential research, development and demonstration (RD&D) initiatives that would support further development of the priority technology options.

  2. On eddy accumulation with limited conditional sampling to measure air-surface exchange

    SciTech Connect (OSTI)

    Wesely, M.L.; Hart, R.L.

    1994-01-01

    An analysis of turbulence data collected at a height of 12.3 m above grasslands was carried out to illustrate some of the limitations and possible improvements in methods to compute vertical fluxes of trace substances by the eddy accumulation technique with conditional sampling. The empirical coefficient used in the technique has a slight dependence on atmospheric stability, which can be minimized by using a threshold vertical velocity equal to approximately 0.75{sigma}{sub w}, below which chemical sampling is suspended. This protocol results in a smaller chemical sample but increases the differences in concentrations by approximately 70%. For effective conditional sampling when mass is being accumulated in a trap or reservoir, the time of sampling during updrafts versus downdrafts should be measured and used to adjust estimates of the mean concentrations.

  3. Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder

    SciTech Connect (OSTI)

    Kerrigan, P.

    2014-03-01

    Building Science Corporation (BSC) worked directly with the David Weekley Homes - Houston division to develop a cost-effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses in preparation for the upcoming code changes in 2015. This research project addressed the following questions: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost?

  4. Impact of Charge Degradation on the Life Cycle Climate Performance of a Residential Air-Conditioning System

    SciTech Connect (OSTI)

    Beshr, Mohamed; Aute, Vikrant; Abdelaziz, Omar; Fricke, Brian A; Radermacher, Reinhard

    2014-01-01

    Vapor compression systems continuously leak a small fraction of their refrigerant charge to the environment, whether during operation or servicing. As a result of the slow leak rate occurring during operation, the refrigerant charge decreases until the system is serviced and recharged. This charge degradation, after a certain limit, begins to have a detrimental effect on system capacity, energy consumption, and coefficient of performance (COP). This paper presents a literature review and a summary of previous experimental work on the effect of undercharging or charge degradation of different vapor compression systems, especially those without a receiver. These systems include residential air conditioning and heat pump systems utilizing different components and refrigerants, and water chiller systems. Most of these studies show similar trends for the effect of charge degradation on system performance. However, it is found that although much experimental work exists on the effect of charge degradation on system performance, no correlation or comparison between charge degradation and system performance yet exists. Thus, based on the literature review, three different correlations that characterize the effect of charge on system capacity and energy consumption are developed for different systems as follows: one for air-conditioning systems, one for vapor compression water-to-water chiller systems, and one for heat pumps. These correlations can be implemented in vapor compression cycle simulation tools to obtain a better prediction of the system performance throughout its lifetime. In this paper, these correlations are implemented in an open source tool for life cycle climate performance (LCCP) based design of vapor compression systems. The LCCP of a residential air-source heat pump is evaluated using the tool and the effect of charge degradation on the results is studied. The heat pump is simulated using a validated component-based vapor compression system model and

  5. Air-conditioning electricity savings and demand reductions from exterior masonry wall insulation applied to Arizona residences

    SciTech Connect (OSTI)

    Ternes, M.P.; Wilkes, K.E.

    1993-06-01

    A field test involving eight single-family houses was performed during the summer of 1991 in Scottsdale, Arizona to evaluate the potential of reducing air-conditioning electricity consumption and demand by insulating their exterior masonry walls. Total per house costs to perform the installations ranged from $3610 to $4550. The average annual savings was estimated to be 491 kWh, or 9% of pre-retrofit consumption. Peak demands without and with insulation on the hottest day of an average weather year for Phoenix were estimated to be 4.26 and 3.61 kill, for a demand reduction of 0.65 kill (15%). We conclude that exterior masonry wall insulation reduces air-conditioning electricity consumption and peak demand in hot, dry climates similar to that of Phoenix. Peak demand reductions are a primary benefit, making the retrofit worthy of consideration in electric utility conservation programs. Economics can be attractive from a consumer viewpoint if considered within a renovation or home improvement program.

  6. Air-conditioning electricity savings and demand reductions from exterior masonry wall insulation applied to Arizona residences

    SciTech Connect (OSTI)

    Ternes, M.P.; Wilkes, K.E.

    1993-01-01

    A field test involving eight single-family houses was performed during the summer of 1991 in Scottsdale, Arizona to evaluate the potential of reducing air-conditioning electricity consumption and demand by insulating their exterior masonry walls. Total per house costs to perform the installations ranged from $3610 to $4550. The average annual savings was estimated to be 491 kWh, or 9% of pre-retrofit consumption. Peak demands without and with insulation on the hottest day of an average weather year for Phoenix were estimated to be 4.26 and 3.61 kill, for a demand reduction of 0.65 kill (15%). We conclude that exterior masonry wall insulation reduces air-conditioning electricity consumption and peak demand in hot, dry climates similar to that of Phoenix. Peak demand reductions are a primary benefit, making the retrofit worthy of consideration in electric utility conservation programs. Economics can be attractive from a consumer viewpoint if considered within a renovation or home improvement program.

  7. Japanese and American competition in the development of scroll compressors and its impact on the American air conditioning industry

    SciTech Connect (OSTI)

    Ushimaru, Kenji )

    1990-02-01

    This report examines the technological development of scroll compressors and its impact on the air conditioning equipment industry. Scroll compressors, although considered to be the compressors of the future for energy-efficient residential heat pumps and possibly for many other applications, are difficult to manufacture on a volume-production base. The manufacturing process requires computer-aided, numerically controlled tools for high-precision fabrication of major parts. Japan implemented a global strategy for dominating the technological world market in the 1970s, and scroll compressor technology benefited from the advent of new-generation machine tools. As a result, if American manufacturers of scroll compressors purchase or are essentially forced to purchase numerically controlled tools from Japan in the future, they will then become dependent on their own competitors because the same Japanese conglomerates that make numerically controlled tools also make scroll compressors. This study illustrates the importance of the basic machine tool industry to the health of the US economy. Without a strong machine tool industry, it is difficult for American manufacturers to put innovations, whether patented or not, into production. As we experience transformation in the air conditioning and refrigeration market, it will be critical to establish a consistent national policy to provide healthy competition among producers, to promote innovation within the industry, to enhance assimilation of new technology, and to eliminate practices that are incompatible with these goals. 72 refs., 8 figs., 1 tab.

  8. Simplified Space Conditioning in Low-Load Homes: Results from Pittsburgh, Pennsylvania, New Construction Unoccupied Test House

    SciTech Connect (OSTI)

    Poerschke, A.; Stecher, D.

    2014-06-01

    Field testing was performed in a new construction unoccupied test house in Pittsburgh, Pennsylvania. Four air-based heating, ventilation, and air conditioning distribution systems--a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms--were evaluated during heating, cooling, and midseason conditions. The relative ability of each system was assessed with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

  9. Simplified Space Conditioning in Low-Load Homes: Results from Pittsburgh, Pennsylvania, New Construction Unoccupied Test House

    SciTech Connect (OSTI)

    Poerschke, Andrew; Stecher, Dave

    2014-06-01

    Field testing was performed in a new construction unoccupied test house in Pittsburgh, PA. Four air-based heating, ventilation, and air conditioning distribution systems—a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms—were evaluated during heating, cooling, and midseason conditions. The relative ability of each system was assessed with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

  10. Idaho Cleanup Contractor Surpasses Significant Safety Milestones

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS, Idaho For the second time in a little over a year, employees with DOE contractor CH2M-WG Idaho (CWI) supporting EM at the Idaho site have achieved 1 million hours without a recordable injury. They also worked more than 1.7 million hours without a lost work-time injury.

  11. Contractor Employee Pension and Medical Benefits Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-06-19

    To ensure that reimbursement of costs incurred by Department of Energy (DOE) contractors' pension and medical benefits are reasonable in accordance with applicable laws, regulations and contract requirements and reflect prudent business practices. This directive has been suspended as of June 19, 2006, for 1 year. For more information, see DOE N 251.66.

  12. Idaho Site Contractor Achieves Treatment Project Milestone

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Idaho site’s main cleanup contractor recently achieved a major performance milestone by successfully passing an operational readiness review for a first-of-a-kind facility that will treat the remaining 900,000 gallons of liquid radioactive waste generated by the site’s legacy cleanup mission.

  13. Experimental and kinetic study of autoignition in methane/ethane/air and methane/propane/air mixtures under engine-relevant conditions

    SciTech Connect (OSTI)

    Huang, J.; Bushe, W.K.

    2006-01-01

    The ignition delay of homogeneous methane/air mixtures enriched with small fractions of ethane/propane was measured using the reflected-shock technique at temperatures from 900 to 1400 K and pressures from 16 to 40 bar. The results show complex effects of ethane/propane on the ignition of methane, but a common trend observed with both hydrocarbons is an increased promotion effect for temperatures below 1100 K. A detailed kinetic mechanism was used to investigate the interaction between ethane/propane and the ignition chemistry of methane under the above conditions. It was found that at relatively low temperatures, the reactions between ethane/propane and methylperoxy (CH{sub 3}O{sub 2}) lead to an enhanced rate of formation of OH radicals in the initiation phase of the ignition. By systematically applying the quasi-steady-state assumptions to the intermediate species involved in the main reaction path identified, we have achieved an analytical description of the ignition process in the transitional temperature regime. The analytical solutions agree reasonably well with the detailed kinetic model and the experimental results for both ignition delay and concentrations of major intermediate species.

  14. Copper contamination effects on hydrogen-air combustion under SCRAMJET (supersonic combustion ramjet) testing conditions

    SciTech Connect (OSTI)

    Chang, S.L.; Lottes, S.A.; Berry, G.F.

    1990-01-01

    Two forms of copper catalytic reactions (homogeneous and heterogeneous) in hydrogen flames were found in a literature survey. Hydrogen atoms in flames recombine into hydrogen molecules through catalytic reactions, and these reactions which affect the timing of the combustion process. Simulations of hydrogen flames with copper contamination were conducted by using a modified general chemical kinetics program (GCKP). Results show that reaction times of hydrogen flames are shortened by copper catalytic reactions, but ignition times are relatively insensitive to the reactions. The reduction of reaction time depends on the copper concentration, copper phase, particle size (if copper is in the condensed phase), and initial temperature and pressure. The higher the copper concentration of the smaller the particle, the larger the reduction in reaction time. For a supersonic hydrogen flame (Mach number = 4.4) contaminated with 200 ppm of gaseous copper species, the calculated reaction times are reduced by about 9%. Similar reductions in reaction time are also computed for heterogeneous copper contamination. Under scramjet testing conditions, the change of combustion timing appears to be tolerable (less than 5%) if the Mach number is lower than 3 or the copper contamination is less than 100 ppm. The higher rate the Mach number, the longer the reaction time and the larger the copper catalytic effects. 7 tabs., 8 figs., 34 refs.

  15. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    SciTech Connect (OSTI)

    Burdick, Arlan

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  16. Tips: Air Conditioners

    Broader source: Energy.gov [DOE]

    How to operate your air conditioner efficiently, or consider alternatives to air conditioning that can cool effectively in many climates.

  17. Office of River Protection Women-Owned Small Business Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection Women-Owned Small Business Contractor Receives One-Year Extension Office of River Protection Women-Owned Small Business Contractor Receives One-Year ...

  18. Two EM Contractors Are Among Fiscal Year 2015 Small Business...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Two EM Contractors Are Among Fiscal Year 2015 Small Business Award Winners Two EM Contractors Are Among Fiscal Year 2015 Small Business Award Winners June 15, 2016 - 12:05pm ...

  19. EM's Liquid Waste Contractor Produces $21 Million in Savings...

    Office of Environmental Management (EM)

    Liquid Waste Contractor Produces 21 Million in Savings with 'Lean' System EM's Liquid Waste Contractor Produces 21 Million in Savings with 'Lean' System April 29, 2015 - 12:00pm ...

  20. DOE Selects Two Contractors for Multiple-Award Waste Disposal...

    Office of Environmental Management (EM)

    Selects Two Contractors for Multiple-Award Waste Disposal Contract DOE Selects Two Contractors for Multiple-Award Waste Disposal Contract April 12, 2013 - 12:00pm Addthis Media ...

  1. Local Contractors Face an Enviable Challenge | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Local Contractors Face an Enviable Challenge Local Contractors Face an Enviable Challenge A photo of a man and a woman looking at plans for a home. Clean Energy Works in Portland, ...

  2. West Valley Demonstration Project Contractor Reaches 2 Million...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration Project Contractor Reaches 2 Million Safe Work Hours West Valley Demonstration Project Contractor Reaches 2 Million Safe Work Hours May 31, 2016 - 12:20pm Addthis A ...

  3. Programs and Contractors - Top Tips for Successful Relationships...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programs and Contractors - Top Tips for Successful Relationships (101) Programs and Contractors - Top Tips for Successful Relationships (101) October 22, 2015 1:00PM to 2:30PM...

  4. Home Performance Contractor Pro Forma | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Home Performance Contractor Pro Forma, with program HR, assumptions, marketing actuals and costs, and more, as posted on the U.S. Department of Energy's Better Buildings Neighborhood Program website. Home Performance Contractor Pro Forma (1.18 MB

  5. High Efficiency Integrated Space Conditioning, Water Heating and Air Distribution System for HUD-Code Manufactured Housing

    SciTech Connect (OSTI)

    Henry DeLima; Joe Akin; Joseph Pietsch

    2008-09-14

    Recognizing the need for new space conditioning and water heating systems for manufactured housing, DeLima Associates assembled a team to develop a space conditioning system that would enhance comfort conditions while also reducing energy usage at the systems level. The product, Comboflair® was defined as a result of a needs analysis of project sponsors and industry stakeholders. An integrated system would be developed that would combine a packaged airconditioning system with a small-duct, high-velocity air distribution system. In its basic configuration, the source for space heating would be a gas water heater. The complete system would be installed at the manufactured home factory and would require no site installation work at the homesite as is now required with conventional split-system air conditioners. Several prototypes were fabricated and tested before a field test unit was completed in October 2005. The Comboflair® system, complete with ductwork, was installed in a 1,984 square feet, double-wide manufactured home built by Palm Harbor Homes in Austin, TX. After the home was transported and installed at a Palm Harbor dealer lot in Austin, TX, a data acquisition system was installed for remote data collection. Over 60 parameters were continuously monitored and measurements were transmitted to a remote site every 15 minutes for performance analysis. The Comboflair® system was field tested from February 2006 until April 2007. The cooling system performed in accordance with the design specifications. The heating system initially could not provide the needed capacity at peak heating conditions until the water heater was replaced with a higher capacity standard water heater. All system comfort goals were then met. As a result of field testing, we have identified improvements to be made to specific components for incorporation into production models. The Comboflair® system will be manufactured by Unico, Inc. at their new production facility in St. Louis

  6. DOE Selects Seven Contractors for Waste Treatment Basic Ordering...

    Office of Environmental Management (EM)

    Contractor Business Size Eligible Services Babcock Services, Inc Small Alternative Disposition Strategies (Restricted and Unrestricted RecyclingReuse); Ancillary Services ...

  7. Arbitration Guidance for Management & Operating Contractors | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Arbitration Guidance for Management & Operating Contractors Arbitration Guidance for Management & Operating Contractors The Office of the General Counsel, in conjunction with the Office of the General Counsel of the NNSA, has reviewed the question of whether M&O contractors can include binding arbitration in their contracts with third-parties. (41.19 KB) More Documents & Publications Microsoft Word - Arbitration Guidance for M&amp;O Contractors.docx DOE General

  8. DOE Announces New Policy for Contractor Benefit Reimbursements | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Policy for Contractor Benefit Reimbursements DOE Announces New Policy for Contractor Benefit Reimbursements April 27, 2006 - 10:32am Addthis WASHINGTON , DC - The Department of Energy (DOE) today announced new policy measures for the reimbursement of contractor pension and medical benefit plan costs that are based on sound business practices and market-based benchmarks for cost management. The Department will continue to reimburse contractors for costs for current and retired

  9. Better Buildings Neighborhood Program Workforce Peer Exchange Call: Contractor Pricing

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Workforce Peer Exchange Call: Contractor Pricing, call slides and discussion summary, September 27, 2012.

  10. PIA - Savannah River Site Management and Operating Contractor (HRMS) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) (292.43 KB) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA -

  11. Laboratory Evaluation of Air Flow Measurement Methods for Residential HVAC Returns

    SciTech Connect (OSTI)

    Walker, Iain; Stratton, Chris

    2015-07-01

    This project improved the accuracy of air flow measurements used in commissioning California heating and air conditioning systems in Title 24 (Building and Appliance Efficiency Standards), thereby improving system performance and efficiency of California residences. The research team at Lawrence Berkeley National Laboratory addressed the issue that typical tools used by contractors in the field to test air flows may not be accurate enough to measure return flows used in Title 24 applications. The team developed guidance on performance of current diagnostics as well as a draft test method for use in future evaluations. The series of tests performed measured air flow using a range of techniques and devices. The measured air flows were compared to reference air flow measurements using inline air flow meters built into the test apparatus. The experimental results showed that some devices had reasonable results (typical errors of 5 percent or less) but others had much bigger errors (up to 25 percent).

  12. Passive Room-to-Room Air Transfer, Fresno, California (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-02-01

    Field testing was performed in a retrofit unoccupied test house in Fresno, California. Three air-based heating, ventilation, and air conditioning (HVAC) distribution systems - a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, and a system with no ductwork to the bedrooms - were evaluated during heating, cooling, and midseason conditions. The relative ability of each of the three systems was assessed with respect to relevant Air Conditioning Contractors of America (ACCA) and ASHRAE standards for house temperature uniformity and stability, respectively. Computational fluid dynamics (CFD) modeling also was performed and refined based on comparison to field test results to determine the air flow rate into the bedrooms of over-door and bottom-of-door air transfer grilles.

  13. Contractor Earned Value Management System Certification Status | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Contractor Earned Value Management System Certification Status Contractor Earned Value Management System Certification Status Certification Status for major EM Contracts Contractor Earned Value Management System Certification Status (129.04 KB) More Documents & Publications Department of Energy Earned Value Management Survey Results VPP Participant Status EM Major Contracts Awarded Since 2006

  14. Contractor Rating and Feedback Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rating and Feedback Systems Contractor Rating and Feedback Systems Better Buildings Residential Workforce/ Business Partners Peer Exchange Call Series: Contractor Rating and Feedback Systems, Call Slides and Discussion Summary, April 24, 2014. Call Slides and Discussion Summary (1.35 MB) More Documents & Publications Outreach to Faith--Based Organizations Approaches to Approved Contractor Lists Lessons Learned: Peer Exchange Calls -- No. 3

  15. DOE Federal and Eligible Contractor Use | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal and Eligible Contractor Use DOE Federal and Eligible Contractor Use DOE Federal and Eligible Contractor Use 071615.docx (28.88 KB) More Documents & Publications List of Enterprise-Wide Agreements Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR)

  16. CINCINNATI PARTNERS WITH CONTRACTORS FOR SUSTAINABILITY | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy CINCINNATI PARTNERS WITH CONTRACTORS FOR SUSTAINABILITY CINCINNATI PARTNERS WITH CONTRACTORS FOR SUSTAINABILITY CINCINNATI PARTNERS WITH CONTRACTORS FOR SUSTAINABILITY Approaching energy efficiency as a step to local economic transformation, the Greater Cincinnati Energy Alliance (GCEA) has worked to reduce energy consumption in the Greater Cincinnati, Ohio, and northern Kentucky regions by encouraging homeowners, commercial property owners, and nonprofit organizations to undertake

  17. Construction Contractor Checklist | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Contractor Checklist For small businesses seeking contracting opportunities with Argonne in the construction/demolition field, please be sure you have taken the following steps in advance of receiving a contract solicitation to ensure you are in a position to make a successful bid: Determine whether your company is a small business. Check the North American Industrial Classification System (NAICS) codes for your industry and the related size standard and gross revenue standards.

  18. Impact of Solar Control PVB Glass on Vehicle Interior Temperatures, Air-Conditioning Capacity, Fuel Consumption, and Vehicle Range

    SciTech Connect (OSTI)

    Rugh, J.; Chaney, L.; Venson, T.; Ramroth, L.; Rose, M.

    2013-04-01

    The objective of the study was to assess the impact of Saflex1 S-series Solar Control PVB (polyvinyl butyral) configurations on conventional vehicle fuel economy and electric vehicle (EV) range. The approach included outdoor vehicle thermal soak testing, RadTherm cool-down analysis, and vehicle simulations. Thermal soak tests were conducted at the National Renewable Energy Laboratory's Vehicle Testing and Integration Facility in Golden, Colorado. The test results quantified interior temperature reductions and were used to generate initial conditions for the RadTherm cool-down analysis. The RadTherm model determined the potential reduction in air-conditioning (A/C) capacity, which was used to calculate the A/C load for the vehicle simulations. The vehicle simulation tool identified the potential reduction in fuel consumption or improvement in EV range between a baseline and modified configurations for the city and highway drive cycles. The thermal analysis determined a potential 4.0% reduction in A/C power for the Saflex Solar PVB solar control configuration. The reduction in A/C power improved the vehicle range of EVs and fuel economy of conventional vehicles and plug-in hybrid electric vehicles.

  19. Analysis and experimental study on formation conditions of large-scale barrier-free diffuse atmospheric pressure air plasmas in repetitive pulse mode

    SciTech Connect (OSTI)

    Li, Lee Liu, Lun; Liu, Yun-Long; Bin, Yu; Ge, Ya-Feng; Lin, Fo-Chang

    2014-01-14

    Atmospheric air diffuse plasmas have enormous application potential in various fields of science and technology. Without dielectric barrier, generating large-scale air diffuse plasmas is always a challenging issue. This paper discusses and analyses the formation mechanism of cold homogenous plasma. It is proposed that generating stable diffuse atmospheric plasmas in open air should meet the three conditions: high transient power with low average power, excitation in low average E-field with locally high E-field region, and multiple overlapping electron avalanches. Accordingly, an experimental configuration of generating large-scale barrier-free diffuse air plasmas is designed. Based on runaway electron theory, a low duty-ratio, high voltage repetitive nanosecond pulse generator is chosen as a discharge excitation source. Using the wire-electrodes with small curvature radius, the gaps with highly non-uniform E-field are structured. Experimental results show that the volume-scaleable, barrier-free, homogeneous air non-thermal plasmas have been obtained between the gap spacing with the copper-wire electrodes. The area of air cold plasmas has been up to hundreds of square centimeters. The proposed formation conditions of large-scale barrier-free diffuse air plasmas are proved to be reasonable and feasible.

  20. Air Quality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Heat & Cool » Home Cooling Systems » Air Conditioning Air Conditioning Air conditioners cost U.S. homeowners more than $11 billion each year, and regular maintenance can keep your air conditioner running efficiently. | Photo courtesy of ©iStockphoto/JaniceRichard Air conditioners cost U.S. homeowners more than $11 billion each year, and regular maintenance can keep your air conditioner running efficiently. | Photo courtesy of ©iStockphoto/JaniceRichard Two-thirds of all homes in the

  1. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    SciTech Connect (OSTI)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an

  2. Strategy Guideline. Transitioning HVAC Companies to Whole House Performance Contractors

    SciTech Connect (OSTI)

    Burdick, Arlan

    2012-05-01

    This report describes the findings from research IBACOS conducted related to heating, ventilation, and air conditioning (HVAC) companies who have made the decision to transition to whole house performance contracting (WHPC).

  3. Strategy Guideline: Transitioning HVAC Companies to Whole House Performance Contractors

    SciTech Connect (OSTI)

    Burdick, A.

    2012-05-01

    This report describes the findings from research IBACOS conducted related to heating, ventilation, and air conditioning (HVAC) companies who have made the decision to transition to whole house performance contracting (WHPC).

  4. Evaluation of the response of tritium-in-air instrumentation to HT in dry and humid conditions and to HTO vapor

    SciTech Connect (OSTI)

    Phillips, H.; Dean, J.; Privas, E.

    2015-03-15

    Nuclear plant operators (power generation, decommissioning and reprocessing operations) are required to monitor releases of tritium species for regulatory compliance and radiation protection purposes. Tritium monitoring is performed using tritium-in-air gas monitoring instrumentation based either on flow-through ion chambers or proportional counting systems. Tritium-in-air monitors are typically calibrated in dry conditions but in service may operate at elevated levels of relative humidity. The NPL (National Physical Laboratory) radioactive gas-in-air calibration system has been used to study the effect of humidity on the response to tritium of two tritium-in-air ion chamber based monitors and one proportional counting system which uses a P10/air gas mixture. The response of these instruments to HTO vapour has also been evaluated. In each case, instrument responses were obtained for HT in dry conditions (relative humidity (RH) about 2%), HT in 45% RH, and finally HTO at 45% RH. Instrumentation response to HT in humid conditions has been found to slightly exceed that in dry conditions. (authors)

  5. Court denies review of contractor/utility feud: contractors fear denial sets precedent

    SciTech Connect (OSTI)

    Poplett, J.

    1986-02-03

    On Jan. 27, the US Supreme Court refused to review a recent federal circuit court decision allowing a California public utility to enter into energy-related contractor activities; this may set a precedent for future related cases, according to an attorney for the contractor plaintiffs. The Supreme Court's refusal lets stand the 9th Federal Circuit Court of Appeals decision on Grason Electric Co. et al. vs. the Sacramento Municipal Utility District (SMUD). That decision allows SMUD - a public utility - to engage in energy-related businesses such as the installation of energy management systems and lighting retrofits, according to the attorney. The plaintiffs in the case, 13 electrical contractors in the Sacramento area, originally brought the case against SMUD on antitrust grounds because, they alleged, the utility was encroaching upon their businesses.

  6. Better Buildings Neighborhood Program Business Models Guide: HVAC Contractor Business Model Conclusion

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Business Models Guide: HVAC Contractor Business Model Conclusion, Summary of HVAC Contractor Insights.

  7. Computational Assessment of the GT-MHR Graphite Core Support Structural Integrity in Air-Ingress Accident Condition

    SciTech Connect (OSTI)

    Jong B. Lim; Eung S. Kim; Chang H. Oh; Richard R. Schultz; David A. Petti

    2008-10-01

    The objective of this project was to perform stress analysis for graphite support structures of the General Atomics’ 600 MWth GT-MHR prismatic core design using ABAQUS ® (ver. 6.75) to assess their structural integrity in air-ingress accident conditions where the structure weakens over time due to oxidation damages. The graphite support structures of prismatic type GT-MHR was analyzed based on the change of temperature, burn-off and corrosion depth during the accident period predicted by GAMMA, a multi-dimensional gas multi-component mixture analysis code developed in the Republic of Korea (ROK)/United States (US) International –Nuclear Engineering Research Initiative (I-NERI) project. Both the loading and thermal stresses were analyzed, but the thermal stress was not significant, leaving the loading stress to be the major factor. The mechanical strengths are exceeded between 11 to 11.5 days after loss-of-coolant-accident (LOCA), corresponding to 5.5 to 6 days after the start of natural convection.

  8. Advanced control strategies for heating, ventilation, air-conditioning, and refrigeration systems—An overview: Part I: Hard control

    SciTech Connect (OSTI)

    D. Subbaram Naidu; Craig G. Rieger

    2011-02-01

    A chronological overview of the advanced control strategies for heating, ventilation, air-conditioning, and refrigeration (HVAC&R) is presented in this article. The overview focuses on hard-computing or control techniques, such as proportional-integral-derivative, optimal, nonlinear, adaptive, and robust; soft-computing or control techniques, such as neural networks, fuzzy logic, genetic algorithms; and on the fusion or hybrid of hard- and soft-control techniques. Thus, it is to be noted that the terminology “hard” and “soft” computing/control has nothing to do with the “hardware” and “software” that is being generally used. Part I of a two-part series focuses on hard-control strategies, and Part II focuses on softand fusion-control in addition to some future directions in HVAC&R research. This overview is not intended to be an exhaustive survey on this topic, and any omission of other works is purely unintentional.

  9. Laboratory Evaluation of Air Flow Measurement Methods for Residential HVAC Returns for New Instrument Standards

    SciTech Connect (OSTI)

    Walker, Iain; Stratton, Chris

    2015-08-01

    This project improved the accuracy of air flow measurements used in commissioning California heating and air conditioning systems in Title 24 (Building and Appliance Efficiency Standards), thereby improving system performance and efficiency of California residences. The research team at Lawrence Berkeley National Laboratory addressed the issue that typical tools used by contractors in the field to test air flows may not be accurate enough to measure return flows used in Title 24 applications. The team developed guidance on performance of current diagnostics as well as a draft test method for use in future evaluations. The study team prepared a draft test method through ASTM International to determine the uncertainty of air flow measurements at residential heating ventilation and air conditioning returns and other terminals. This test method, when finalized, can be used by the Energy Commission and other entities to specify required accuracy of measurement devices used to show compliance with standards.

  10. DOE Facility Management Contracts Facility Owner Contractor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility Management Contracts Facility Owner Contractor Award Date End Date Options/Award Term Ultimate Potential Expiration Date Contract FY Competed Parent Companies INEEL (AMWTP Ops) EM Bechtel BWXT Idaho LLC (Under Protest) 6/15/1999 3/31/2011 2 three month option periods until protest resolved 9/30/2011 M&O 1999 Bechtel National, Inc. (67%) and Babcock and Wilcox Company (33%) Portsmouth Remediation EM LATA/Parallax 1/10/2005 6/30/2010 2/28/2011 Site Clean up 2005 Los Alamos Technical

  11. Measure Guideline: Guide to Attic Air Sealing

    SciTech Connect (OSTI)

    Lstiburek, Joseph

    2014-09-01

    The purpose of this measure guideline is to provide information and recommendations for the preparation work necessary prior to adding attic insulation. Even though the purpose of this guide is to save energy, health, safety, and durability should not be compromised by energy efficiency. Accordingly, combustion safety and ventilation for indoor air quality are addressed first. Durability and attic ventilation then follow. Finally, to maximize energy savings, air sealing is completed prior to insulating. The guide is intended for home remodelers, builders, insulation contractors, mechanical contractors, general contractors who have previously done remodeling and homeowners as a guide to the work that needs to be done.

  12. Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-04-07

    The Order ensures that DOE and NNSA management and operating and other facility management contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships.

  13. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  14. 2014-02-07 Issuance: Certification of Commercial Heating, Ventilation, and Air-conditioning, Water Heating, and Refrigeration Equipment; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding certification of commercial heating, ventilation, and air-conditioning, water-heating, and refrigeration equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

  15. 2014-11-25 Issuance: Energy Conservation Standards for Small, Large, and Very Large Air-cooled Commercial Package Air Conditioning and Heating Equipment; Extension of Public Comment Period

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register extension of the public comment period regarding energy conservation standards for small, large and very large air-cool commercial package air conditioning and heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on November 25, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  16. 2014-09-18 Issuance: Energy Conservation Standard for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment; Notice of Proposed Rulemaking and Public Meeting

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Notice of Proposed Rulemaking and Public Meeting regarding Energy Conservation Standards for Small, large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, as issued by the Assistant Secretary for Energy Efficiency and Renewable Energy on September 18, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  17. Worker Protection Management for DOE Federal and Contractor Employees |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Services » Program Management » Safety » Worker Protection Management for DOE Federal and Contractor Employees Worker Protection Management for DOE Federal and Contractor Employees This Order establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Worker Protection Management for DOE Federal and

  18. Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boosts Energy Upgrade Conversions | Department of Energy Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions. Spotlight on Maine (411.14 KB) More Documents & Publications Better Buildings: Financing and Incentives: Spotlight on Maine:

  19. SECRETARIAL POLICY STATEMENT ON CONTRACTOR DEFINED BENEFIT PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECRETARIAL POLICY STATEMENT ON CONTRACTOR DEFINED BENEFIT PENSION PLANS The Department of Energy (DOE) has a longstanding interest in the retention and well- being of the workforce employed by its management and operating (M&O) and other significant contractors, which today include nuclear, laboratory, and environmental clean-up contractors. Much of the work performed by employees under M&O and other significant contracts initially required and continues to require highly specialized

  20. Engaging and Growing Small Contractor Businesses | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Growing Small Contractor Businesses Engaging and Growing Small Contractor Businesses Better Buildings Neighborhood Program Workforce Peer Exchange Call: Engaging and Growing Small Contractor Businesses, call slides and discussion summary, November 8, 2012. Call Slides and Discussion Summary (376.64 KB) More Documents & Publications Quality Control, Standardization of Upgrades, and Workforce Expectations Working with Condominium Owners and Associations Transitioning to a Utility Funded

  1. Local Contractors Face an Enviable Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Local Contractors Face an Enviable Challenge Local Contractors Face an Enviable Challenge A photo of a man and a woman looking at plans for a home. Clean Energy Works in Portland, Oregon, has become so good at enticing homeowners to complete energy efficiency evaluations and upgrades that some contractors are politely asking for the projects to slow down a bit. Clean Energy Works hit the ground running by launching its program with significant rebate offers to residents. However, the rebates

  2. Meeting between Department of Energy Contractor and the Nuclear Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Institute Regarding Proposed Revision of 10 CFR 810 | Department of Energy between Department of Energy Contractor and the Nuclear Energy Institute Regarding Proposed Revision of 10 CFR 810 Meeting between Department of Energy Contractor and the Nuclear Energy Institute Regarding Proposed Revision of 10 CFR 810 Pursuant to DOE's Guidance on Ex Parte Communications (74 Fed. Reg. 52,795; Oct. 14, 2009), this memorandum is to memorialize the meeting between a Department of Energy contractor

  3. Acquisition Letter on Allowability of Incurred Costs Due to Contractor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Errors | Department of Energy on Allowability of Incurred Costs Due to Contractor Errors Acquisition Letter on Allowability of Incurred Costs Due to Contractor Errors The attached Acquisition Letter has been issued to provide application guidance to contracting officers for determining the allowability of incurred costs due to contractor errors. It applies to all contracts, including management and operating contracts, whose price or cost reimbursement is based on estimated or incurred

  4. Acquisition Guide, Chapter 42.15, Contractor Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapter has been updated to tailor the chapter for Department of Energy (DOE) use of the Contractor Performance Assessment Reporting System (CPARS). The updated Guide Chapter includes internal procedures for evaluating and reporting contractor performance information pursuant to the recently amended FAR subpart 42.15 and the OFPP memorandum of July 29,2009, entitled "Improving the Use of Contractor Performance Information" include evaluation factors, rating scales, and appropriate management controls.

  5. Effective Loan Program Design and Integration with Contractors | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Loan Program Design and Integration with Contractors Effective Loan Program Design and Integration with Contractors Better Buildings Residential Network Financing and Revenue Peer Exchange Call Series: Effective Loan Program Design and Integration with Contractors, July 24, 2014, Call Slides and Discussion Summary. Call Slides and Discussion Summary (1.69 MB) More Documents & Publications Opportunities through the PowerSaver Loan Program Aggressive Underwriting and Smart

  6. Contacts for the Assistant General Counsel for Contractor Human Resources |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Contractor Human Resources Contacts for the Assistant General Counsel for Contractor Human Resources Jean S. Stucky, Assistant General Counsel for Contractor Human Resources 202-586-7532 jean.stucky@hq.doe.gov Eva M. Auman, Attorney-Adviser 202-287-5630 Grant Programs Legacy/Closure Sites Hanford Moab National Energy Testing Laboratory National Renewable Energy Laboratory Pacific Northwest National Laboratory Waste Isolation Pilot Project (Carlsbad Field Office) Thomas

  7. DOE Seeks Input On Addressing Contractor Pension and Medical Benefits

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Liabilities | Department of Energy Input On Addressing Contractor Pension and Medical Benefits Liabilities DOE Seeks Input On Addressing Contractor Pension and Medical Benefits Liabilities March 27, 2007 - 12:10pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced in the Federal Register that it is seeking public comment on how to address the increasing costs and liabilities of contractor employee pension and medical benefits. Under the Department of Energy's unique

  8. DOE Strategic Petroleum Reserve Contractor Receives the Baldrige Award |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Strategic Petroleum Reserve Contractor Receives the Baldrige Award DOE Strategic Petroleum Reserve Contractor Receives the Baldrige Award April 19, 2006 - 10:21am Addthis Vice President Cheney Presents DOE contractor with the nation's highest Presidential honor for performance excellence and quality achievement WASHINGTON, DC - Vice President Richard Cheney today presented DynMcDermott Petroleum Operations Company, operator of the U.S. Department of Energy's (DOE)

  9. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EXISTING CONTRACTS | Department of Energy CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS The Department issued a Final Rule revising the regulations covering contractor legal management requirements at 10 C.F.R. 719 (Federal Register May 3, 2013; http://www.gpo.gov/fdsys/pkg/FR-2013-05-03/pdf/2013-10485.pdf). It requires Contracting Officers to attempt to execute

  10. Preaward Survey of Prospective Contractor Accounting System Checklist

    National Nuclear Security Administration (NNSA)

    Preaward Survey of Prospective Contractor Accounting System Checklist 1 [FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor's accounting system is adequate for determining costs applicable to the contract. If no information is available in the files to make this determination, a Preaward Survey of Prospective Contractor's Accounting System (SF1408) can be requested from DCAA. Before requesting such an audit, it is a good idea to send this checklist

  11. Department of Energy Contractor Diana Lewis Heading to National Small

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Week | Department of Energy Department of Energy Contractor Diana Lewis Heading to National Small Business Week Department of Energy Contractor Diana Lewis Heading to National Small Business Week June 10, 2013 - 8:50am Addthis Department of Energy Contractor Diana Lewis Heading to National Small Business Week John H. Hale III John H. Hale III Director, Office of Small and Disadvantaged Business Utilization National Small Business Week is around the corner, kicking off on June 17

  12. Future Air Conditioning Energy Consumption in Developing Countriesand what can be done about it: The Potential of Efficiency in theResidential Sector

    SciTech Connect (OSTI)

    McNeil, Michael A.; Letschert, Virginie E.

    2007-05-01

    The dynamics of air conditioning are of particular interestto energy analysts, both because of the high energy consumption of thisproduct, but also its disproportionate impact on peak load. This paperaddresses the special role of this end use as a driver of residentialelectricity consumption in rapidly developing economies. Recent historyhas shown that air conditioner ownership can grow grows more rapidly thaneconomic growth in warm-climate countries. In 1990, less than a percentof urban Chinese households owned an air conditioner; by 2003 this numberrose to 62 percent. The evidence suggests a similar explosion of airconditioner use in many other countries is not far behind. Room airconditioner purchases in India are currently growing at 20 percent peryear, with about half of these purchases attributed to the residentialsector. This paper draws on two distinct methodological elements toassess future residential air conditioner 'business as usual' electricityconsumption by country/region and to consider specific alternative 'highefficiency' scenarios. The first component is an econometric ownershipand use model based on household income, climate and demographicparameters. The second combines ownership forecasts and stock accountingwith geographically specific efficiency scenarios within a uniqueanalysis framework (BUENAS) developed by LBNL. The efficiency scenariomodule considers current efficiency baselines, available technologies,and achievable timelines for development of market transformationprograms, such as minimum efficiency performance standards (MEPS) andlabeling programs. The result is a detailed set of consumption andemissions scenarios for residential air conditioning.

  13. WIPP contractor receives VPP Legacy of Stars Award 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Operating Contractor Recognized for Continuous Safety Performance CARLSBAD, N.M., September 20, 2013 - The U.S. Department of Energy (DOE) recognized Nuclear Waste ...

  14. Effective Loan Program Design and Integration with Contractors...

    Broader source: Energy.gov (indexed) [DOE]

    Financing and Revenue Peer Exchange Call Series: Effective Loan Program Design and Integration with Contractors, July 24, 2014, Call Slides and Discussion Summary. Call Slides and ...

  15. The Department of Energy's Management of Contractor Responsibility...

    Office of Environmental Management (EM)

    ... conducted an Excluded Parties List System search for 14 prospective contractors prior to ... Also, an official indicated that a procurement employee had left the procurement ...

  16. Better Buildings: Workforce, Spotlight on Maine: Contractor Sales...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    program webinars for contractors, and works with partners to continue offering ... The program conducted a nationwide search and selected Dale Carnegie Training, a ...

  17. Title 2 CFR 25 Universal Identifier and Central Contractor Registratio...

    Open Energy Info (EERE)

    CFR 25 Universal Identifier and Central Contractor Registration Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 2...

  18. Independent Oversight Review of Department of Energy Contractor...

    Broader source: Energy.gov (indexed) [DOE]

    The Department of Energy (DOE) Office of Oversight performed a two-phased review of eight Departmental contractor occupational medicine programs. The first phase of the review was ...

  19. Audit of the Contractor Incentive Program at the Nevada Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... This practice created a retroactive, artificial basis to support the payment of contractor fees and was incompatible with the basic principles of performance-based contracting. In ...

  20. Department of Energy Announces Selection of Transportation Contractors...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Announces Selection of Transportation Contractors at the Waste ... TSMT, based in Joplin, MO, is a nationwide carrier with experience hauling hazardous and ...

  1. Cleanup Contractor at Paducah Site Receives Performance Excellence Award

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – The environmental cleanup contractor at EM’s Paducah site has been honored for demonstrating serious commitment to performance improvement principles.

  2. Workforce Development and Sales Training for Energy Efficiency Contractors

    Broader source: Energy.gov [DOE]

    This webinar covered expectations for growth and training needs, home performance workforce development, weatherization sales training, and enabling contractors to succeed.

  3. Strategies for Aligning Program Demand with Contractor's Seasonal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategies for Aligning Program Demand with Contractor's Seasonal Fluctuations Better Buildings Neighborhood Program Workforce Peer Exchange Call: Strategies for Aligning Program ...

  4. Strategies for Building Contractor Interest in Program Participation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategies for Building Contractor Interest in Program Participation Better Buildings Residential Network Workforce Business Partners Peer Exchange Call: Strategies for Building ...

  5. Montana Board of Water Well Contractors Handbook | Open Energy...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Montana Board of Water Well Contractors HandbookPermittingRegulatory...

  6. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Environmental Management (EM)

    Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm ...

  7. Approaches to Approved Contractor Lists | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Making the Program Work for Contractors Better Buildings - Spotlight on Portland, Oregon; Financing and Incetntives: Use Incentives to Get Attention and Encourage Deep Savings

  8. Solar/Wind Contractor Licensing | Open Energy Information

    Open Energy Info (EERE)

    Licensing Louisiana InstallerContractor Photovoltaics Solar Water Heat Yes Tennessee Solar Panel Installation Specialty and Solar Thermal-Geothermal Licensing (Tennessee)...

  9. Policy Flash: 2013-52 Contractor Legal Management Requirements...

    Energy Savers [EERE]

    Legal Management Requirements.pdf More Documents & Publications POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS...

  10. Audit of the Department of Energy's Contractor Liability Insurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Office of Contractor Human Resource Management ... all internal control deficiencies that may have existed. ... will stipulate that the Head of Contracting Activity is ...

  11. Solar and Wind Contractor Licensing | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    < Back Eligibility InstallersContractors Savings Category Solar - Passive Solar Water Heat Solar Space Heat Solar Photovoltaics Wind (All) Wind (Small) Program Info Sector Name...

  12. Acquisition Guide, Chapter 42.16, Reporting Other Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon PF2010-56 AG 42.16, Reporting Other Contractor Information into the Federal Awardee Performance and Integrity Information System More Documents & Publications ...

  13. Contractor Statement of Work (SOW) Template (for EIR)

    Broader source: Energy.gov [DOE]

    The template presented below is a Statement of Work (SOW) for services of an EIR Contractor for conducting an EIR. Project and review specific information should be incorporated.

  14. Political Activity at DOE Facilities by DOE Contractors | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Activity at DOE Facilities by DOE Contractors Political Activity at DOE Facilities by DOE Contractors The attached guidance is issued to Contracting Officers to remind them of restrictions on political activity by DOE contractors at the Department's facilities PF2011-02 Political Activity at DOE Facilities or by DOE Contractors, which now includes updated attachments (53.83 KB) PF2011-02a.pdf (17.3 KB) More Documents & Publications Microsoft Word - Political Activity and the

  15. WAPA Purchase of Energy Contractor Template | Department of Energy

    Energy Savers [EERE]

    rgyContractorTemplate.doc More Documents & Publications WAPA General Power Contract Provisions Lessons Learned Quarterly Report, March 1997 Interested Parties - WAPA Public Comment...

  16. ADMINISTRATIVE CHANGE TO NAP-25, Management and Operating Contractor...

    National Nuclear Security Administration (NNSA)

    ... (coffee, tea, water, soda) for business meetings and contractor award ceremonies X No Federal approval or notification required Light Refreshments (coffee, tea, water, soda) for ...

  17. Savannah River Site Liquid Waste Contractor Earns Excellent Performanc...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on key deliverables directly tied to the startup and integration of the Salt Waste ... River Site SRR employees work through the Lean process. EM's Liquid Waste Contractor ...

  18. Meeting between Department of Energy Contractor and the Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Contractor and the Nuclear Energy Institute Regarding Proposed Revision of 10 CFR ... More Documents & Publications Meeting Between the Department of Energy and the ...

  19. Enforcement Letter, Geiger Brothers Mechanical Contractors, INC- March 26, 2010

    Broader source: Energy.gov [DOE]

    Issued to Geiger Brothers Mechanical Contractors, Inc. related to Installation and Inspection of Penetration Fire Seals at the DUF6 Conversion Building at the Portsmouth Gaseous Diffusion Plant

  20. CONTRACTOR PRE-PROCESSING INVESTIGATION VERIFICATION;SF 2730...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    access authorizations (i.e., security clearance) must include thorough review of an ... Contractor Badge Request All clearance requests must be initiated via the online ...

  1. Cleanup Contractor Achieves ‘Elite’ Nuclear Material Accountability Status

    Office of Energy Efficiency and Renewable Energy (EERE)

    PADUCAH, Ky. – EM’s cleanup contractor at the Paducah site has received national acclaim for timeliness of reporting and promptness in reconciling nuclear material inventories.

  2. Home Performance Contractor Pro Forma | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Home Performance Contractor Pro Forma, with program HR, assumptions, marketing actuals and costs, and more, as posted on the U.S. Department of Energy's Better Buildings ...

  3. Plug-In Electric Vehicle Handbook for Electrical Contractors (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01

    This handbook answers basic questions about plug-in electric vehicles, charging stations, charging equipment, charging equipment installation, and training for electrical contractors.

  4. Acquisition Letter on Contractor Domestic Extended Personnel Assignments

    Broader source: Energy.gov [DOE]

    The attached Acquisition Letter has been issued to provide guidance on the Department's policy governing reimbursement of costs associated with contractor domestic extended personnel assignments.

  5. Cromer Cycle Air Conditioner

    Broader source: Energy.gov [DOE]

    New Air Conditioning System Uses Desiccant to Transfer Moisture and Increase Efficiency and Capacity

  6. NEW - DOE O 350.3, Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    To ensure that contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships; that contractor relations/human resources specialists achieve consultations with management and operating contractors; and that appropriate labor standards are included in DOE/NNSA contracts and subcontracts. Cancels Chapters I-III of DOE O 350.1 Chg 4. Does not cancel other directives.

  7. ISSUANCE 2015-06-30: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

  8. ISSUANCE 2014-12-23: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

  9. Simplified Space Conditioning in Low-Load Homes: Results from the Fresno, California, Retrofit Unoccupied Test House

    SciTech Connect (OSTI)

    Stecher, Dave; Poerschke, Andrew

    2014-02-01

    In this study, the Building America team, IBACOS, sought to determine cost-effective, energy-efficient solutions for heating and cooling houses. To this end, the team performed field testing in a retrofit unoccupied test house in Fresno, California, to evaluate three air-based heating, ventilation, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. These included a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, and a system with no ductwork to the bedrooms. The relative ability of each of the three systems was assessed with respect to relevant Air Conditioning Contractors of America (ACCA) and ASHRAE standards for house temperature uniformity and stability, respectively. Computational fluid dynamics modeling also was performed and refined based on comparison to field test results to determine the air flow rate into the bedrooms of over-door and bottom-of-door air transfer grilles.

  10. Simplified Space Conditioning in Low-Load Homes: Results from the Fresno, California, Retrofit Unoccupied Test House

    SciTech Connect (OSTI)

    Stecher, D.; Poerschke, A.

    2014-02-01

    Field testing was performed in a retrofit unoccupied test house in Fresno, California. Three air-based heating, ventilation, and air conditioning (HVAC) distribution systems -- a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, and a system with no ductwork to the bedrooms -- were evaluated during heating, cooling, and midseason conditions. The relative ability of each of the three systems was assessed with respect to relevant Air Conditioning Contractors of America (ACCA) and ASHRAE standards for house temperature uniformity and stability, respectively. Computational fluid dynamics (CFD) modeling also was performed and refined based on comparison to field test results to determine the air flow rate into the bedrooms of over-door and bottom-of-door air transfer grilles.

  11. Drug Testing and Security Clearances of Contractor Personnel | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Drug Testing and Security Clearances of Contractor Personnel Drug Testing and Security Clearances of Contractor Personnel PF2008-12.pdf (345.23 KB) PF2008-12a - Attachment - Acquisition Letter 2008-03 (92.02 KB) More Documents & Publications Acquisition Letters Remaining in Effect Acquisition Letters Remaining In Effect Acquisition Letters Remaining In Effect

  12. Carlsbad Field Office Technical Assistance Contractor Shares In Top Honor

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. The Carlsbad Field Office Technical Assistance Contractors (CTAC) parent company, Portage, Inc., and its 400 employees nationwide recently achieved a significant milestone by exceeding one million hours worked over 560 days without a lost-time injury or illness.

  13. Guideline for the preparation of a contractor safety plan

    SciTech Connect (OSTI)

    Stinnett, L

    1982-04-01

    This document is only a guideline for contractors to use in formalizing a safety program or preparing a safety plan. It contains a format of a suggested safety plan as well as pertinent safety elements which should be considered for inclusion. However, consideration of only those items listed may not be sufficient. Each contractor should include in the safety plan particular reference to those elements peculiar to the inherent hazards of the contractor's specific type of construction services, whether the hazard is shown in the list of safety elements or not. Each safety plan should be reviewed annually by the contractor's management. Reissue of the safety plan is mandatory if safety requirements have changed, or if the contractor's address or management (approval signature) has changed.

  14. Health and Safety Guide for Home Performance Contractors

    SciTech Connect (OSTI)

    Stratton, Chris; Walker, Iain S.

    2012-02-15

    This report is intended to provide home performance contractor trainers with a resource to keep both their workers and home residents safe and healthy. This document is an attempt to describe what we currently believe is safe, what we believe is unsafe, and what we’re unsure about. It is intended to identify health and safety issues and provide historical context and current understanding of both risks and mitigation strategies. In addition, it provides links to more in-depth resources for each issue. When we tighten the thermal envelope of a house to improve comfort and reduce energy use, we have to be sure that we are not compromising the indoor air quality of the home. This means identifying and mitigating or eliminating pollution sources before and after you make changes to the home. These sources can include materials and finishes in the home, exhaust gasses from combustion appliances, soil gasses such as radon, and moisture from a bathroom, kitchen, or unvented clothes dryer. Our first responsibility is to do no harm — this applies both to our clients and to our employees. Currently, there are many new products that are widely used but whose health effects are not well understood. Our in ability to have perfect information means the directive to do no harm can be difficult to obey. Each home is a little bit different, and in the face of a situation you’ve never encountered, it’s important to have a solid grasp of the fundamental concepts of building science when the hard and fast rules don’t apply . The home performance industry is gaining momentum, and has the potential to expand greatly as energy costs continue to rise. It is imperative that we remain vigilant about protecting the health and safety of our workers and our customers. It only takes a few news stories about a family that got sick after their home was tightened by a home performance contractor to scare off potential customers and taint the reputation of the entire industry. Good

  15. US Department of Energys Regulatory Negotiations Convening on Commercial Certification for Heating, Ventilating, Air-Conditioning, and Refrigeration Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    US Department of Energy's Regulatory Negotiations Convening on Commercial Certification for Heating, Ventilating, Air-Conditioning, and Refrigeration Equipment Public Information for Convening Interviews I. What are the substantive issues DOE seeks to address? Strategies for grouping various basic models for purposes of certification; Identification of non-efficiency attributes, which do not impact the measured consumption of the equipment as tested by DOE's test procedure; The information that

  16. MCA 37-43-100 Water Well Contractors | Open Energy Information

    Open Energy Info (EERE)

    Water Well Contractors Citation MCA 37-43-100 Water Well Contractors (2014). Retrieved from "http:en.openei.orgwindex.php?titleMCA37-43-100WaterWellContractors&oldid80237...

  17. 48 C.F.R. 970.0309: Whistleblower Protection of Contractor Employees...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 C.F.R. 970.0309: Whistleblower Protection of Contractor Employees 48 C.F.R. 970.0309: Whistleblower Protection of Contractor Employees Stakeholders: DOE contractors Scope: 48 ...

  18. Pending indoor air quality and radon abatement legislation. Hearing before the Subcommittee on Clean Air and Nuclear Regulation of the Committee on Environment and Public Works, United States Senate, One Hundred Third Congress, First Session on S. 656 and S. 657, May 25, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    This hearing on pending indoor air quality and radon abatement legislation includes testimony from individuals and representatives of the following groups: Business Council on Indoor Air; American Lung Association; Consumer Federation of America; Radiation Protection Programs, NJ; School of Hygiene and Public Health, Johns Hopkins University; AFL-CIO; EPA; National Parent Teacher Association. Additional material includes statements from: American Lung Assoc.; Alliance for Radon Reduction; Alliance to Save Energy; American Industrial Hygiene Assoc.; Bowser Morner, Inc.; Building Owners and Managers Assoc. International; Chemical Specialties Manufacturers Assoc.; Council for American Private Education; National Assoc. of Home Builders; National Assoc. of Realtors; National School Boards Assoc.; Sheet Metal and Air Conditioning Contractors National Assoc.

  19. Contingency contractor optimization. Phase 3, model description and formulation.

    SciTech Connect (OSTI)

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Detry, Richard Joseph; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-10-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  20. Contingency contractor optimization. phase 3, model description and formulation.

    SciTech Connect (OSTI)

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Detry, Richard Joseph; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-06-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  1. 10 C.F.R. 708: DOE Contractor Employee Protection Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 708: DOE Contractor Employee Protection Program 10 C.F.R. 708: DOE Contractor Employee Protection Program Stakeholders: Employee(s) of DOE contractor(s) Scope: 10 C.F.R. 708 establishes criteria and procedures for the investigation, hearing, and review of allegations from DOE contractor employees of employer reprisal resulting from employee disclosure of information to DOE, to members of Congress, or to the contractor; employee participation in proceedings before Congress or pursuant

  2. Cost-Effective, Customer-Focused, and Contractor-Focused Data...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Effective, Customer-Focused, and Contractor-Focused Data Tracking Systems Cost-Effective, Customer-Focused, and Contractor-Focused Data Tracking Systems Better Buildings ...

  3. Statement of Work (SOW) Template (Combined EIR/ICE Support Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement of Work (SOW) Template (Combined EIRICE Support Contractor) Statement of Work (SOW) Template (Combined EIRICE Support Contractor) The template presented below is a ...

  4. Mentoring and Job Training in the Field for Newly Trained Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mentoring and Job Training in the Field for Newly Trained Contractors Mentoring and Job Training in the Field for Newly Trained Contractors Better Buildings Neighborhood Program ...

  5. Laboratory Evaluation of Air Flow Measurement Methods for Residential...

    Office of Scientific and Technical Information (OSTI)

    research team at Lawrence Berkeley National Laboratory addressed the issue that typical tools used by contractors in the field to test air flows may not be accurate enough to...

  6. LABORATORY EVALUATION OF AIR FLOW MEASUREMENT METHODS FOR RESIDENTIAL...

    Office of Scientific and Technical Information (OSTI)

    tools used by contractors in the field to test air flows may not be accurate enough to ... The team developed guidance on performance of current diagnostics as well as a draft test ...

  7. Laboratory Evaluation of Air Flow Measurement Methods for Residential...

    Office of Scientific and Technical Information (OSTI)

    tools used by contractors in the field to test air flows may not be accurate enough to ... The team developed guidance on performance of current diagnostics as well as a draft test ...

  8. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Cost Plus Award Fee 136,996,348 November 4, 2011 - September 30, 2016 0 EM Contractor Fee Moab Uranium Mill Tailings - Moab, UT Moab Uranium Mill Tailings Remedial Action ...

  9. Economic Impact of 8(a) and Native American Contractors

    Broader source: Energy.gov [DOE]

    Editor's Note: This blog post was guest written by Jennine Elias, Director of External Affairs for the Native American Contractors Association (www.nativecontractors.org)

  10. Environment/Health/Safety: Sub-Contractor Construction Resource...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EH&S Sub-Contractor Construction Resource Page 2015 Home EHS0470-GERT JHA Templates Tool Box Safety Topics Pub-3000 Ch. 10 - Construction Safety Manual Administrative Policies...

  11. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    33,802,034 Fee Information August 29, 2011 - March 9, 2020 0 NA EM Contractor Fee West Valley Demonstration Project - West Valley, NY West Valley Demonstration Project Phase 1...

  12. PART 708 -- DOE CONTRACTOR EMPLOYEE PROTECTION PROGRAM | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... If you are an employee of a contractor, you may not file a complaint against your employer under this part if: (a) The complaint is based on race, color, religion, sex, age, ...

  13. WIPP Security Contractor Receives DOE Voluntary Protection Program Award

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M.– Security Walls, LLC, the security contractor for the U.S. Department of Energy’s (DOE) Waste Isolation Pilot Plant (WIPP), recently received the DOE Voluntary Protection Program (VPP) Legacy Star award.

  14. Savannah River Site Liquid Waste Contractor Earns Excellent Performance Rating

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – EM’s Savannah River Site (SRS) liquid waste contractor earned nearly a 96 percent award fee rating for exceeding most performance goals in key cleanup and risk reduction activities in fiscal year 2015.

  15. Savannah River Site Contractor Receives Project Management Institute Award

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The local chapter of the Project Management Institute (PMI) recently honored the Savannah River Site liquid waste contractor with its 2011 Project of the Year award.

  16. FY 2007/2008 Contractor Performance Plan, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2006-10-03

    This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

  17. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Broader source: Energy.gov (indexed) [DOE]

    January 1, 2010 - October 7, 2014 EM Contractor Fee Savannah River Site Office - Aiken, SC Comprehensive Security Services June 2015 Fee Information 42,685,445 0 Option 1:...

  18. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Broader source: Energy.gov (indexed) [DOE]

    Cumulative Fee 570,363,260 394,157,083 EM Contractor Fee Savannah River Site Office, Aiken, SC Management & Operating Contract June 2015 DE-AC09-08SR22470 Cost Plus Award Fee...

  19. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Broader source: Energy.gov (indexed) [DOE]

    to 63017 DE-AC09-09SR22505 Fee Information 0 EM Contractor Fee Savannah River Site Office - Aiken, SC Liquid Waste Processing Contract June 2015 Savannah River Remediation LLC...

  20. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Broader source: Energy.gov (indexed) [DOE]

    DE-AC09-02SR22210 Fee Information NA EM Contractor Fee Savannah River Site Office - Aiken, SC Salt Waste Processing Contract June 2015 50,000,000 0 September 17, 2002 -...

  1. EM Reviews Portsmouth, Paducah Site Contractor Performance, Determines Award Fees

    Broader source: Energy.gov [DOE]

    LEXINGTON, Ky. – EM has completed annual performance evaluations of four prime contractors working on the deactivation, decontamination, and decommissioning of the former gaseous diffusion plants near Portsmouth, Ohio and Paducah, Kentucky.

  2. EM's Oak Ridge Office Contractor Scores High in Latest Award...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 27, 2016 - 12:50pm Addthis OAK RIDGE, Tenn. - EM gave URS | CH2M Oak Ridge LLC ... Each year, EM releases information relating to contractor fee payments - earned by ...

  3. FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor...

    Office of Environmental Management (EM)

    FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor: LATA Environmental Services of Kentucky, LLC Contract No.: DE-AC30-10CC40020 Award Period: October 1, 2013 through ...

  4. Award Fee Evaluation Period 5 Determination Scorecard Contractor...

    Office of Environmental Management (EM)

    5 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC Contract: DE-AC30-10CC40017 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, 2015) ...

  5. Award Fee Evaluation Period 6 Determination Scorecard Contractor...

    Office of Environmental Management (EM)

    6 Determination Scorecard Contractor: Wastren-EnergX Mission Support, LLC Contract: DE-CI0000004 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, ...

  6. Montana Board of Water Well Contractors Webpage | Open Energy...

    Open Energy Info (EERE)

    Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Board of Water Well Contractors Webpage Abstract Provides information on water well...

  7. Worker Protection Management for DOE Federal and Contractor Employees

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-03-27

    Establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Cancels DOE O 440.1.

  8. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Project Office Paducah Infrastructure Contract June 2015 8,207,978 Swift & Staley Mechanical Contractors Inc. DE-AC30-10CC40021 March 16, 2010 - September 15, 2015 Cost Plus...

  9. Waste Isolation Pilot Plant Contractor Receives 86 Percent of...

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee April 27, 2016 - 12:20pm Addthis Nuclear Waste Partnership received about 86 percent of the available ...

  10. CRAD, NNSA- Contractor Training and Qualification (T&Q)

    Office of Energy Efficiency and Renewable Energy (EERE)

    CRAD for Contractor Training and Qualification (T&Q). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  11. DOE Selects Contractor for Depleted Hexafluoride Conversion Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support March 25, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 Bill.Taylor@srs.gov Cincinnati ...

  12. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    September 2015 8,207,978 Swift & Staley Mechanical Contractors Inc. DE-AC30-10CC40021 March 16, 2010 - November 30, 2015 Cost Plus Award Fee 137,637,795 Fee Information NA 0...

  13. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    15 (Fixed Fee) 346,377,995 Fee Information 2,039,246 EM Contractor Fee Oak Ridge Office - Oak Ridge, TN Transuranic Waste Processing Contract September 2015 Cost Plus Award Fee...

  14. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Cumulative Fee 5,985,266 2,636,218 5,985,266 Portage, Inc. DE-DT0002936 NA Cost Plus Award Fee 131,545,597 November 4, 2011 - September 30, 2016 0 EM Contractor Fee...

  15. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    350,000 Cumulative Fee 1,950,000 564,955 HPM Corporation DE-EM0002043 Firm Fixed Price Plus Award Fee Fee Information 0 October 1, 2012 - September 30, 2014 EM Contractor Fee...

  16. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Energy Savers [EERE]

    Option 2: 10116 to 73118 EM Contractor Fee Savannah River Site Office, Aiken, SC Management & Operating Contract September 2015 DE-AC09-08SR22470 Cost Plus Award Fee...

  17. FY 2007/2008 Contractor Performance Plan, Volume 2

    SciTech Connect (OSTI)

    Project Integration

    2006-10-03

    This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

  18. EM Contractor's Success in Addressing Challenging Waste Leads...

    Office of Environmental Management (EM)

    Idaho Site cleanup contractor CH2M-WG Idaho's (CWI) success last year in treating and packaging 6,000 drums of radioactive and hazardous waste left over from the Cold War weapons...

  19. EM River Corridor Cleanup Contractor Surpasses 7 Million Safe Hours

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office contractor Washington Closure Hanford (WCH) and its subcontractor employees achieved a significant safety milestone by working 7 million hours without a lost workday injury.

  20. Home Performance Contractor Pro Forma | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Excel sheet for program model, expenses, HR, and marketing, as posted on the U.S. Department of Energy's Better Buildings Neighborhood Program website. Home Performance Contractor Pro Forma (1022.61 KB

  1. Hanford Site Services Contractor Receives Fiscal Year 2015 Evaluation

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) announced that contractor Mission Support Alliance, LLC (MSA) earned approximately 89 percent of available fee for services provided at the Hanford Site last fiscal year.

  2. Contractor Performance Assessment Reporting System (CPARS) Web Based Training Classes

    Office of Energy Efficiency and Renewable Energy (EERE)

    The DOE Acquisition Career Manager (ACM) has approved Continuous Learning Points (CLPs) for Contractor Performance Assessment Reporting System (CPARS) web based training classes. See the attachment for list of classes.

  3. DOE recognizes Nevada National Security Site contractor for safety |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) DOE recognizes Nevada National Security Site contractor for safety Tuesday, September 8, 2015 - 9:09am Steve Lawrence,left, and Ray Juzaitis National Security Technologies (NSTec), the primary contractor at the Nevada National Security Site, has been recognized by the Department of Energy for excellence in occupational safety and health protection. National Nuclear Security Administration Nevada Field Office Manager Steve Lawrence, left,

  4. Environmental Contractor Mentors Young Students | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Contractor Mentors Young Students Environmental Contractor Mentors Young Students November 26, 2014 - 12:00pm Addthis Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Middle school students use water bottles and powdered drink mix to learn how contamination

  5. WIPP contractor receives VPP Legacy of Stars Award 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Operating Contractor Recognized for Continuous Safety Performance CARLSBAD, N.M., September 20, 2013 - The U.S. Department of Energy (DOE) recognized Nuclear Waste Partnership LLC (NWP), the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor, with the Voluntary Protection Program (VPP) Legacy of Stars Award in latter August 2013. "Safety is central to everything we do, and achieving this elite designation validates our work and the safety-focused

  6. National Nuclear Security Administration Contractor Governance, IG-0881

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Nuclear Security Administration Contractor Governance DOE/IG-0881 February 2013 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 February 19, 2013 MEMORANDUM FOR THE ACTING ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "National Nuclear Security Administration Contractor Governance" INTRODUCTION Since July

  7. Non-Facility Contractor Prior Performance, IG-0857

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Non-Facility Contractor Prior Performance DOE/IG-0857 October 2011 Department of Energy Washington, DC 20585 October 28, 2011 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Non-Facility Contractor Prior Performance" INTRODUCTION AND OBJECTIVE The Department of Energy obligated approximately $89 billion during Fiscal Years 2009 and 2010, through various contracts and financial assistance awards, including contracts funded

  8. 2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    SciTech Connect (OSTI)

    West, W. J.; Lucas, J. G.; Gano, K. A.

    2011-11-14

    This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractors revegetation and mitigation areas on the Hanford Site.

  9. GC Opinion on Contractor Participation in the Federal Hiring Process |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Opinion on Contractor Participation in the Federal Hiring Process GC Opinion on Contractor Participation in the Federal Hiring Process The Office of the Inspector General provided the Secreatry of Energy a Report in response to a Special Inquiry regarding hiring and contracting practices. The Report made recommendations concerning contract employee participation on interviewing panels and the Federal Acquisition Regulation. This Opinion is a response to that

  10. Strategic Petroleum Reserve Contractor to Receive 2005 Malcolm Baldrige

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Quality Award | Department of Energy Petroleum Reserve Contractor to Receive 2005 Malcolm Baldrige National Quality Award Strategic Petroleum Reserve Contractor to Receive 2005 Malcolm Baldrige National Quality Award November 22, 2005 - 2:51pm Addthis Recognition for Management Performance Excellence and Continuous Improvement to Stakeholders WASHINGTON, DC - Secretary of Energy Samuel Bodman today announced that DynMcDermott Petroleum Operations Company, operator of the nation's

  11. Streamline Service Delivery via Customer Communication and Contractor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Coordination | Department of Energy Streamline Service Delivery via Customer Communication and Contractor Coordination Streamline Service Delivery via Customer Communication and Contractor Coordination Better Buildings Neighborhood Program Workforce Peer Exchange Call: Streamlining Service Delivery from the Customer's Perspective, Call Slides and Discussion Summary, August 30, 2012. Call Slides and Discussion Summary (1.22 MB) More Documents & Publications Keeping It Simple from the

  12. Energy Department Selects Deactivation Contractor for Paducah Gaseous

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Diffusion Plant | Department of Energy Deactivation Contractor for Paducah Gaseous Diffusion Plant Energy Department Selects Deactivation Contractor for Paducah Gaseous Diffusion Plant July 22, 2014 - 5:48pm Addthis News Media Contact Brad Mitzelfelt, (859) 219-4035, brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy (DOE) today awarded a Task Order under the Nationwide Environmental Management ID/IQ Unrestricted Contract to Fluor Federal Services, Inc. for

  13. U. S. Department of Energy Savannah River Operations Office - Contractor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Contractor Performance Contractor Performance SRNS FY 15 Award Fee Determination Scorecard Adobe Acrobat PDF FY 14 Award Fee Determination Scorecard Adobe Acrobat PDF FY 13 Award Fee Determination Scorecard Adobe Acrobat PDF Award Fee Determination for FY 13 Adobe Acrobat PDF Award Fee Determination for FY 12 Adobe Acrobat PDF Award Fee Determination for FY 11 Adobe Acrobat PDF Award Fee Determination for FY 10 Adobe Acrobat PDF Award Fee Determination for FY 09 Adobe Acrobat PDF

  14. State Honors Hanford's Tank Operations Contractor for Hiring Veterans |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy State Honors Hanford's Tank Operations Contractor for Hiring Veterans State Honors Hanford's Tank Operations Contractor for Hiring Veterans August 31, 2015 - 12:05pm Addthis WRPS Compliance Programs Lead Lisa Bunch holds a plaque the company received from the Washington State Employment Security Department (ESD) for the company’s commitment to hiring veterans. Also pictured are, from left to right, Dave Olson, WRPS president and project manager; Jennie Weber,

  15. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  16. STATEMENT OF WORK (SOW) TEMPLATE FOR ICE SUPPORT CONTRACTOR

    Office of Environmental Management (EM)

    ICE SUPPORT CONTRACTOR The template presented below is a Statement of Work (SOW) for services of an ICE Support Contractor for assisting OECM in conducting an ICE. Project and review specific information should be incorporated. Explanatory text appears in italics, while information that should be selected appears in <<brackets>>. The format and contents of this SOW is not compulsory, and the use is at the discretion of the OECM Analysts, tailored as appropriate for the desired

  17. STATEMENT OF WORK (SOW) TEMPLATE FOR ICR SUPPORT CONTRACTOR

    Office of Environmental Management (EM)

    ICR SUPPORT CONTRACTOR The template presented below is a Statement of Work (SOW) for services of an OECM ICR Support Contractor for assisting OCEM in performing an ICR. Project and review specific information should be incorporated. Explanatory text appears in italics, while information that should be selected appears in <<brackets>>. The format and contents of this SOW is not compulsory, and the use is at the discretion of the OECM Analysts, tailored as needed for the support

  18. Jefferson Lab recognizes its Outstanding Small Business Contractor for FY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2003 | Jefferson Lab recognizes its Outstanding Small Business Contractor for FY 2003 Sharon Harrah (center), owner of Triad Machine Shop located in Newport News, Va., receives the award plaque from JLab Director Christoph Leemann (right). Harrah is accompanied by her husband, Ed. Jefferson Lab recognizes its Outstanding Small Business Contractor for FY 2003 April 15, 2004 The Department of Energy's Jefferson Lab recognized a local, woman-owned machine shop recently as its Outstanding Small

  19. DOE Seeks Deactivation Contractor for Paducah Gaseous Diffusion Plant |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Deactivation Contractor for Paducah Gaseous Diffusion Plant DOE Seeks Deactivation Contractor for Paducah Gaseous Diffusion Plant August 9, 2013 - 5:30pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Request for Task Proposal (RTP) for deactivation activities at the Paducah Gaseous Diffusion Plant (GDP) in Paducah, Kentucky. These services are required so that DOE can address the return

  20. Nevada National Security Site contractor receives safety recertification

    National Nuclear Security Administration (NNSA)

    for 5th straight year | National Nuclear Security Administration | (NNSA) Nevada National Security Site contractor receives safety recertification for 5th straight year Thursday, November 12, 2015 - 10:08am LAS VEGAS - National Security Technologies, the management and operating contractor for the Nevada National Security Site, continues to conduct some of the nation's most important national security work in the safest manner possible as recognized by consecutive safety awards from the U.S.

  1. Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2014 - September 30, 2015 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate and maintain an armed and uniformed protective force for the physical protection of United States Department of Energy (DOE) security interests and other such related duties at the Savannah River Site (SRS). The

  2. SECTION J, APPENDIX Q - MIN STDS FOR CONTRACTORS' COI PLANS

    National Nuclear Security Administration (NNSA)

    Q, Page 1 SECTION J APPENDIX Q [Note: The Contractors' Conflict of Interest Plan shall be submitted to the Contracting Officer during the Transition Term prior to December 31, 2010.] MINIMUM STANDARDS FOR CONTRACTORS' CONFLICT OF INTEREST (COI) PLANS 12/1/10 A. Corporate Structure The COI Plan shall describe any parent relationship and list all affiliates, subsidiaries, and sister companies, etc. Generally, this need not exceed three corporate tiers, unless a relationship exists beyond three

  3. MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS

    Broader source: Energy.gov [DOE]

    The DOE Office of Enforcement and Investigation (EH Enforcement) invoked a 120-day suspension of PAAA enforcement actions for issues associated with contractor Internal Dose Evaluation Programs (IDEP). Prior to initiation of the suspension, EH Enforcement had identified deficiencies in DOEcontractor implemented bioassay programs at numerous sites within the DOE complex. The commonality of the IDEP deficiencies at the various sites, as well as the possibility of the existence of similar deficiencies at other DOE sites, led EH Enforcement to the conclusion that a suspension of enforcement actions would be appropriate to provide DOE-contractors an opportunity to review their own IDEPs to determine whether similar or other program deficiencies existed, and, if so, to take appropriate corrective action. Contractors were alerted to review their IDEP during the 120-day suspension period. If program deficiencies were identified, and if they met the Noncompliance Tracking System (NTS) criteria, these issues were to be reported into the NTS, along with proposed corrective actions and the anticipated target completion dates. EH Enforcement did not plan to take enforcement action against the contractor for identified IDEP problems if bioassay program deficiencies were identified and reported and if corrective actions, as identified by the contractor, were implemented. However, failure of the contractor to implement proposed corrective actions would permit EH Enforcement to re-open PAAA enforcement action for any of these issues in the future.

  4. 2014-09-23 Issuance: Energy Conservation Standard for Walk-in Coolers and Freezers; Air-Conditioning, Heating, & Refrigeration Institute Petition for Reconsideration Notice of Public Meeting

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of public meeting regarding energy conservation standards for walk-in coolers and freezers; Air-Conditioning, Heating, & Refrigeration Institute petition for reconsideration, as issued by the Deputy Assistant Secretary for Energy Efficiency on September 23, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  5. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Contractor- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Contractor Operational Readiness Review

  6. Better Buildings Neighborhood Program Business Models Guide: HVAC Contractor Business Model Introduction

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Business Models Guide: HVAC Contractor Business Model Introduction.

  7. Use of Facility Contractor Employees for Services to DOE in the Washington, D.C., Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-04-15

    To clarify and modify policies and procedures for management of Department of Energy (DOE) facility contractor employees located in the Washington, D.C., area. A facility contractor employee is any employee of either a contractor responsible for managing a Department-owned facility, such as a National Laboratory, or a subcontractor of such a contractor. Facility contractor means any contractor performing under a Management and Operating (M&O), Management and Integration (M&I), or Environmental Restoration Management Contractor (ERMC) contract awarded by a DOE contracting officer. Canceled by DOE O 350.2.

  8. Microsoft Word - Arbitration Guidance for M&O Contractors.docx | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Arbitration Guidance for M&amp;O Contractors.docx Microsoft Word - Arbitration Guidance for M&amp;O Contractors.docx Microsoft Word - Arbitration Guidance for M&amp;O Contractors.docx (15.21 KB) More Documents & Publications DOE General Counsel Issues Arbitration Guidance for M&O Contractors Arbitration Guidance for Management & Operating Contractors Model Arbitration Provision

  9. Experimental investigation of supersonic low pressure air plasma flows obtained with different arc-jet operating conditions

    SciTech Connect (OSTI)

    Lago, Viviana; Ndiaye, Abdoul-Aziz

    2012-11-27

    A stationary arc-jet plasma flow at low pressure is used to simulate some properties of the gas flow surrounding a vehicle during its entry into celestial body's atmospheres. This paper presents an experimental study concerning plasmas simulating a re-entry into our planet. Optical measurements have been carried out for several operating plasma conditions in the free stream, and in the shock layer formed in front of a flat cylindrical plate, placed in the plasma jet. The analysis of the spectral radiation enabled the identification of the emitting species, the determination of the rotational and vibrational temperatures in the free-stream and in the shock layer and the determination of the distance of the shock to the flat plate face. Some plasma fluid parameters like, stagnation pressure, specific enthalpy and heat flux have been determined experimentally along the plasma-jet axis.

  10. Risk Factors in Heating, Ventilating, and Air-Conditioning Systemsfor Occupant Symptoms in U.S. Office Buildings: the EPA BASE Study

    SciTech Connect (OSTI)

    Mendell, M.J.; Lei-Gomez, Q.; Mirer, A.; Seppanen, O.; Brunner, G.

    2006-10-01

    Nonspecific building-related symptoms among occupants of modern office buildings worldwide are common and may be associated with important reductions in work performance, but their etiology remains uncertain. Characteristics of heating, ventilating, and air-conditioning (HVAC) systems in office buildings that increase risk of indoor contaminants or reduce effectiveness of ventilation may cause adverse exposures and subsequent increase in these symptoms among occupants. We analyzed data collected by the U.S. EPA from a representative sample of 100 large U.S. office buildings--the Building Assessment and Survey Evaluation (BASE) study--using multivariate logistic regression models with generalized estimating equations adjusted for potential personal and building confounders. We estimated odds ratios (ORs) and 95% confidence intervals (CIs) for associations between seven building-related symptom outcomes and selected HVAC system characteristics. Among factors of HVAC design or configuration: Outdoor air intakes less than 60 m above the ground were associated with approximately doubled odds of most symptoms assessed. Sealed (non-operable) windows were associated with increases in skin and eye symptoms (ORs= 1.9, 1.3, respectively). Outdoor air intake without an intake fan was associated with an increase in eye symptoms (OR=1.7). Local cooling coils were associated with increased headache (OR=1.5). Among factors of HVAC condition, maintenance, or operation: the presence of humidification systems in good condition was associated with an increase in headache (OR=1.4), whereas the presence of humidification systems in poor condition was associated with increases in fatigue/difficulty concentrating, as well as upper respiratory symptoms (ORs=1.8, 1.5). No regularly scheduled inspections for HVAC components was associated with increased eye symptoms, cough and upper respiratory symptoms (ORs=2.2, 1.6, 1.5). Less frequent cleaning of cooling coils or drip pans was associated

  11. Building America Best Practices Series, Volume 10: Retrofit Techniques and Technologies: Air Sealing

    SciTech Connect (OSTI)

    Baechler, Michael C.; Gilbride, Theresa L.; Hefty, Marye G.; Cole, Pamala C.; Williamson, Jennifer L.; Love, Pat M.

    2010-04-12

    This report was prepared by PNNL for the U.S. Department of Energy Building America Program. The report provides information to home owners who want to make their existing homes more energy efficient by sealing leaks in the building envelope (ceiling, walls, and floors) that let in drafts and let conditioned air escape. The report provides descriptions of 19 key areas of the home where air sealing can improve home performance and energy efficiency. The report includes suggestions on how to find a qualified weatherization or home performance contractor, what to expect in a home energy audit, opportune times for performing air sealing, and what safety and health concerns to be aware of. The report describes some basic building science concepts and topics related to air sealing including ventilation, diagnostic tools, and code requirements. The report will be available for free download from the DOE Building America website. It is a suitable consumer education tool for home performance and weatherization contractors to share with customers to describe the process and value of home energy retrofits.

  12. Savannah River Site Contractor Achieves Tank Waste Milestone | Department

    Office of Environmental Management (EM)

    of Energy Contractor Achieves Tank Waste Milestone Savannah River Site Contractor Achieves Tank Waste Milestone February 2, 2012 - 12:00pm Addthis Pictured here is a component of the Interim Salt Disposition Process — known as Modular Caustic Side Solvent Extraction Unit (MCU) — that helped Savannah River Remediation process more than 500,000 gallons of salt waste since October last year, a contract milestone. Pictured here is a component of the Interim Salt Disposition Process -

  13. Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup

    Office of Environmental Management (EM)

    Project | Department of Energy Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project July 30, 2013 - 12:00pm Addthis Idaho Governor C.L. “Butch” Otter discusses the importance of completing the cleanup mission at the Idaho site. Idaho Governor C.L. "Butch" Otter discusses the importance of completing the cleanup mission at the Idaho site. An exterior view of the

  14. EM Issues Report Cards to Portsmouth Site Contractors | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Issues Report Cards to Portsmouth Site Contractors EM Issues Report Cards to Portsmouth Site Contractors July 28, 2016 - 1:00pm Addthis WEMS technicians Jim Snodgrass (left) and Jim Dixon set pins in security lock cores at the X-720 Lockshop. WEMS technicians Jim Snodgrass (left) and Jim Dixon set pins in security lock cores at the X-720 Lockshop. Fluor-BWXT Portsmouth workers lower process gas equipment as part of the X-326 process building deactivation. Fluor-BWXT Portsmouth workers

  15. Public Utility Awards EM's Idaho Site Contractor for Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Public Utility Awards EM's Idaho Site Contractor for Energy Conservation Public Utility Awards EM's Idaho Site Contractor for Energy Conservation January 27, 2016 - 12:00pm Addthis Displaying the reward of a team effort between CWI and Idaho Power, from left to right, are Jim Floerke, Chuck Urbanski, and Brian Preussner, all with CWI, and Bo Hanchey and Vern Porter with Idaho Power. Displaying the reward of a team effort between CWI and Idaho Power, from left to right,

  16. Specification for HEPA Filters Used By DOE Contractors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-STD-3020-2005 December 2005 Supersedes DOE-STD-3020-97 January 1997 DOE TECHNICAL STANDARD Specification for HEPA Filters Used by DOE Contractors U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited FOREWARD This U.S. Department of Energy (DOE) standard supersedes DOE-STD-3020-97 and is approved for use by DOE and its contractors. This standard was developed primarily for application in DOE programs. It

  17. Team Hanford: Records management in a multi-contractor environment

    SciTech Connect (OSTI)

    Anderson, E.N.; Anderson, T.V.; Munch, J.W.; Potter, C.N.

    1993-08-01

    Expanding technology, increased emphasis on cost containment, and an ever growing list of requirements and regulations present challenges to records managers. The multi-contractor environment of the Department of Energy`s (DOE) Hanford Site further complicates the picture. In an effort to strengthen the site`s records management program, representatives of DOE`s Richland Operations Office and its four Hanford contractors joined forces. This synergistic Team Hanford approach continues to spawn success and is looked on as a model for similar DOE sites.

  18. Model test on underground coal gasification (UCG) with low-pressure fire seepage push-through. Part I: Test conditions and air fire seepage

    SciTech Connect (OSTI)

    Yang, L.H.

    2008-07-01

    The technology of a pushing-through gallery with oxygen-enriched fire-seepage combustion was studied during shaft-free UCG in this article, and the main experiment parameters were probed. The test results were analyzed in depth. The patterns of variation and development were pointed out for the fire source moving speed, temperature field, leakage rate, the expanding diameter for the gasification gallery, and blasting pressure. Test results showed that, with the increase in the wind-blasting volume, the moving velocity for the fire source speeded up, and the average temperature for the gallery continuously rose. Under the condition of oxygen-enriched air blasting, when O{sub 2} contents stood at 90%, the moving speed for the fire source was 4-5 times that of air blasting. In the push-through process, the average leakage rate for the blasting was 82.23%, with the average discharge volume of 3.43 m{sup 3}/h and average gallery diameter of 7.87 cm. With the proceeding of firepower seepage, the extent of dropping for the leakage rate increased rapidly, and the drop rate for the blasting pressure gradually heightened.

  19. General collaboration offer of Johnson Controls regarding the performance of air conditioning automatic control systems and other buildings` automatic control systems

    SciTech Connect (OSTI)

    Gniazdowski, J.

    1995-12-31

    JOHNSON CONTROLS manufactures measuring and control equipment (800 types) and is as well a {open_quotes}turn-key{close_quotes} supplier of complete automatic controls systems for heating, air conditioning, ventilation and refrigerating engineering branches. The Company also supplies Buildings` Computer-Based Supervision and Monitoring Systems that may be applied in both small and large structures. Since 1990 the company has been performing full-range trade and contracting activities on the Polish market. We have our own well-trained technical staff and we collaborate with a series of designing and contracting enterprises that enable us to have our projects carried out all over Poland. The prices of our supplies and services correspond with the level of the Polish market.

  20. ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR 2 4 CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF COMPUTER SCIENCES CORPORATION (A) (B) (C) (D) (E) (F) DE-AC06-04RL14383/108 c. As a result of this modification, the total obligated funding on the contract remains at $78,915,927.97. All other terms and conditions remain unchanged. FOB: Destination Period of Performance: 01/06/2004 to 09/30/2013 NSN 7540-01-152-8067 OPTIONAL FORM 336

  1. Award Fee Determination Shows Performance Improvement in WTP Contractor

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM Office of River Protection (ORP) Waste Treatment and Immobilization Plant (WTP) contractor Bechtel National Inc. improved its performance slightly in calendar year 2015 compared to the last half of 2014, earning 66 percent of its possible award fee, or $8.31 million out of a possible $12.6 million.

  2. Technical Baseline Summary Description for the Tank Farm Contractor

    SciTech Connect (OSTI)

    TEDESCHI, A.R.

    2000-04-21

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford.

  3. Policy for Federal Oversight and Contractor Assurance Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-08-09

    This Policy establishes the Department of Energy’s (DOE) expectations for the implementation of a comprehensive and robust oversight process that enables the Department’s mission to be accomplished effectively, efficiently, safely, and securely by utilizing and leveraging the outcomes and information from effective Contractor Assurance Systems (CAS) to inform the Government’s oversight wherever appropriate.

  4. Defense Secretary Awards EM Idaho Contractor Freedom Award at Pentagon

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – CH2M-WG Idaho (CWI), the main cleanup contractor for the EM program at the Idaho Operations Office, received the Secretary of Defense Employer Support Freedom Award at the Pentagon for its support of National Guard and Reserve employees.

  5. Criteria and Procedures for DOE Contractor Employee Protection Program

    Broader source: Energy.gov [DOE]

    This regulation provides procedures for processing complaints by employees of DOE contractors alleging retaliation by their employers for disclosure of information concerning danger to public or worker health or safety, substantial violations of law, or gross mismanagement; for participation in Congressional proceedings; or for refusal to participate in dangerous activities.

  6. Configuration Management Plan for the Tank Farm Contractor

    SciTech Connect (OSTI)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  7. Worker Protection Management for DOE Federal and Contractor Employees

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-30

    Establishes the framework for an effective worker protection program that will reduce or prevent accidental losses, injuries, and illnesses by providing DOE Federal and contractor workers with a safe and healthful workplace. Chg 1, 10-26-95; Chg 2, 10-26-96.

  8. Employee-Focused Structure Helps Produce Upgrades for Contractor

    Office of Energy Efficiency and Renewable Energy (EERE)

    Progressive Building Solutions, an energy efficiency contractor participating in Seattle, Washington's Community Power Works program, has an intriguing model to help its employees feel connected to the company's success—employees are part owners. The company's creator, Suraj Lobo, built Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work.

  9. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    6,124,360 Cumulative Fee 42,685,445 25,220,482 Centerra, LLC DE-AC30-10CC60025 Cost Plus Award Fee 989,000,000 January 1, 2010 - October 7, 2014 EM Contractor Fee Savannah...

  10. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    886,941 FY2015 789,766 0 Cumulative Fee 5,641,147 4,490,103 DE-AC27-10RV15051 Cost Plus Award Fee EM Contractor Fee Office of River Protection - Richland, WA Laboratory...

  11. DOE Human Genome Program contractor-grantee workshop

    SciTech Connect (OSTI)

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  12. EM Contractor Reaps Benefits of Continuous Improvement Culture

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Continuous Improvement (CI) at Savannah River Nuclear Solutions (SRNS), EM’s management and operations contractor at the Savannah River Site (SRS), focuses on eliminating wasteful steps in processes, making little changes that result in significant savings.

  13. EM Sees Growth Across Complex in Partnering Agreements with Contractors

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – DOE Savannah River Operations Office Manager Dave Moody views the partnering relationship between his office and liquid waste contractor Savannah River Remediation (SRR) as an opportunity to view cleanup work from each other’s point of view.

  14. Proceedings of the fuels technology contractors review meeting

    SciTech Connect (OSTI)

    Malone, R.D.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  15. Savannah River Site Contractor Resumes Full Operations Following Pause

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Savannah River Site management and operations contractor Savannah River Nuclear Solutions (SRNS) has resumed full operations following an operational pause in September 2015, incorporating improvements and lessons learned across all projects and facilities. The HB Line facility emerged from a period of improvements called Deliberate Operations in April, the last of the SRNS operations to resume full operations.

  16. Clean Air Act. Revision 5

    SciTech Connect (OSTI)

    Not Available

    1994-02-15

    This Reference Book contains a current copy of the Clean Air Act, as amended, and those regulations that implement the statute and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. This Reference Book has been completely revised and is current through February 15, 1994.

  17. Savannah River Site Contractor Agrees to Pay $3.8 Million to...

    Office of Environmental Management (EM)

    Savannah River Site Contractor Agrees to Pay 3.8 Million to Settle False Claims Act Allegations Savannah River Site Contractor Agrees to Pay 3.8 Million to Settle False Claims ...

  18. Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS...

    Energy Savers [EERE]

    Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H...

  19. Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation...

    Office of Environmental Management (EM)

    13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement Costs Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement...

  20. Rev.1 U.S. D EPARTMENT OF ENERGY Contractor Records Custodian Authorization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 (9-2014) Rev.1 U.S. D EPARTMENT OF ENERGY Contractor Records Custodian Authorization SECTION I. Authorization Pursuant to DOE Order 243.1B, Records Management Program, Attachment 1, Contractor Requirements Document, (Name) , employee of (Contractor Organization) , is hereby authorized to function as a Contractor Records Custodian for (DOE Element) . The incumbent responsibilities include complying with the requirements of the noted Contract Requirements Document (CRD), including flowing down

  1. Mentoring and Job Training in the Field for Newly Trained Contractors |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Mentoring and Job Training in the Field for Newly Trained Contractors Mentoring and Job Training in the Field for Newly Trained Contractors Better Buildings Neighborhood Program Workforce Peer Exchange Call: Mentoring and Job Training in the Field for Newly Trained Contractors, April 12, 2012, This call discussed mentoring and job training in the field for newly trained contractors. Call Slides and Discussion Summary (578.89 KB) More Documents & Publications Program

  2. Political Activity at DOE Facilities and by DOE Contractors | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Political Activity at DOE Facilities and by DOE Contractors Political Activity at DOE Facilities and by DOE Contractors The Policy Flash from October 5, 2011, serves to remind Contracting Officers of restrictions on political activity by DOE contractors at the Department facitilites, and it is available here. More Documents & Publications Political Activity Policy Flash Archive Search File Political Activity at DOE Facilities by DOE Contractors

  3. DOE 2010 Continuity of Operations (COOP) Awareness Briefing Available to Contractors

    Broader source: Energy.gov [DOE]

    For each contract requiring or involving responsibility for work or operations at sites or facilities that support or perform essential directly support National Essential Functions Mission Essential Functions (MEF), Primary Mission Essential Functions (PMEF), or Essential Supporting Activities (ESA) the Contractor Requirements Document (CRD) DOE Order 150.1, Continuity Programs, sets forth the contractor responsibility for a Continuity of Operations (COOP) Program. This requires the contractor and its applicable subcontractors to conduct annual COOP awareness briefing for all its contractor workforce.

  4. Spotlight on Austin, Texas: Let Your Contractor Be Your Guide for Big Rewards

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Spotlight on Austin, Texas: Let Your Contractor Be Your Guide for Big Rewards Workforce All About Contractors Austin Energy, a municipally owned utility, has a long history of collaborating closely with the building contractors in its area to deliver energy efficiency programs, which benefits both parties involved. Because contractors understand that Austin Energy has made a long-term commitment to supporting energy efficiency, they have been willing to invest time and money into the technical

  5. DOE General Counsel Issues Arbitration Guidance for M&O Contractors |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors (February 3, 2010) Washington, DC - The Office of the General Counsel, in conjunction with the Office of General Counsel of the NNSA, has reviewed the question of whether Department of Energy contractors can include binding arbitration in their contracts with

  6. Programs and Contractors –Top Tips for Successful Relationships! (101)

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Peer Exchange Call Series: Programs and Contractors - Top Tips for Successful Relationships! (101), October 22, 2015

  7. Contractors Cleaned Up Most of Hanford Site's River Corridor, But Work Remains

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor.

  8. Chapter 70.3102-05-6: Contractor Compensation - Variable Pay | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 3102-05-6: Contractor Compensation - Variable Pay Chapter 70.3102-05-6: Contractor Compensation - Variable Pay Acquisition Guide Chapter 70.3102-05-6: Contractor Compensation - Variable Pay Chapter 70.3102-05-6: Contractor Compensation - Variable Pay (58.2 KB) More Documents & Publications Policy Flash 2016-34 AcqGuide70pt5.doc&#0; Department of Energy Acquisition Letter 2013-04 on Executive Compensation

  9. Electric Vehicle Handbook: Electrical Contractors (Brochure), NREL (National Renewable Energy Laboratory)

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Electrical Contractors Plug-In Electric Vehicle Handbook for Electrical Contractors 2 Table of Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . 3 PEV Basics . . . . . . . . . . . . . . . . . . . . . . . . . 4 Charging Basics . . . . . . . . . . . . . . . . . . . . . 6 Installing and Maintaining EVSE . . . . . . . 9 EVSE Training for Electrical Contractors . . . . . . . . . . . . . . . . 18 Electrifying the Future . . . . . . . . . . . . . . . 19 Clean Cities Helps Deploy PEV

  10. Investigation of techniques to improve continuous air monitors under conditions of high dust loading in environmental setting. 1998 annual progress report

    SciTech Connect (OSTI)

    Schery, S.D.; Wasiolek, P.T. [New Mexico Inst. of Mining and Technology, Socorro, NM (US); Rodgers, J. [Los Alamos National Lab., NM (US)

    1998-06-01

    'Improvement in understanding of the deposition of ambient dust particles on ECAM (Environmental Continuous Air Monitor) filters, reduction of the alpha-particle interference of radon progeny and other radioactive aerosols in different particle size ranges on filters, and development of ECAM''s with increased sensitivity under dusty outdoor conditions. As of May 1, 1998 (1/2 year into the project) the research-prototype 30-cm pulsed ionization chamber (PIC) is assembled and operational with an alpha particle energy resolution of better than 45 keV for 5-MeV alpha particles. Measurements of spectral resolution for alpha particles from radon decay products have been made as a function of filter type and dust loading conditions. So far, a study of ten filter types has found that the best combination of resolution and throughput is obtained with 3.0 \\265m Millipore fluoropore and 1.0 \\265m Corning FNMB filters. Experiments with gypsum and Portland cement dust in the size range 1 to 20 \\265m indicate significant degradation in alpha particle resolution for dust loading above about 0.5 mg cm{sup -2}. Study of metalized films for possible use as a PIC window indicate a minimum broadening of 5-MeV alpha particle peaks from 43 (no film) to 301 keV (with film) for AVR film type B8 (0.20 mg cm{sup -2} polycarbonate). A modified ECAM sampling head, equipped with an optical microscopy system feeding data to a high resolution video data capture and logging instrument, was constructed. This system will enable time-lapse study of dust build-up on ECAM filters and formation of dendrite structures that can reduce alpha-particle resolution.'

  11. Acquisition Guide, Chapters 42.15, Contractor Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapter has been updated to incorporate Federal Acquisition Regulation (FAR) changes published in Federal Acquisition Circular 2005-69. The FAR has Table 42-1 Evaluation Ratings Definitions and Table 42-2 Evaluation Ratings and Definitions for the Small Business Subcontracting Evaluation Factor, when 52.219-9 is used in a contract; therefore, Attachment A, Ratings and Narratives is deleted from this chapter. Other revisions include adding in Section II that evaluations shall be prepared at least annually and at the time the work under a contract or order is completed. In Section IV, it reminds the contracting officer of FAR 17.207 - Exercise of options, to consider the contractor's past performance on other contract actions, as well as, the contractor's performance on the current contract to have acceptable ratings.

  12. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2010 $435,613 $283,148 FY2011 $806,501 $717,785 FY2012 $834,588 $825,720 FY2013 $933,700 $822,589 FY2014 $2,415,920 $2,295,124 FY2015 $3,318,594 $2,982,881 Cumulative Fee $8,744,915 $7,927,247 EM Contractor Fee Portsmouth Paducah Project Office Paducah Infrastructure Contract March 2016 $8,744,915 Swift & Staley Mechanical Contractors Inc. DE-AC30-10CC40021 March 16, 2010 - November 30, 2015 Cost Plus Award Fee $148,546,200 Fee

  13. NREL Selects Contractor for New Research Support Facility - News Releases |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL Selects Contractor for New Research Support Facility Building to showcase renewable energy and energy efficiency technologies August 2, 2006 The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) has selected J.E. Dunn Rocky Mountain Construction to design and construct the first phase of the Laboratory's new Research Support Facilities (RSF). The value of the contract is $9.4 million, appropriated by the Energy and Water Development Subcommittee of the U.S.

  14. NREL Selects Contractor for New Science & Technology Facility - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Releases | NREL Selects Contractor for New Science & Technology Facility September 24, 2004 Golden, Colo. - The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) has signed a subcontract with the M. A. Mortenson Company to build the Laboratory's first major new facility in a decade, the Science & Technology Facility. The value of the construction subcontract is nearly $18 million. The total value of the project, including equipment and furnishings is

  15. Acquisition Guide, Chapter 42.15, Contractor Performance Information

    Broader source: Energy.gov [DOE]

    The subject Acquisition Guide Chapter has been updated to make revisions to the Contractor Performance Assessment Reporting System (CPARS) guidance and includes incorporating Federal Acquisition Regulation (FAR) changes through Federal Acquisition Circular (FAC) 2005-66. Since the CPARS guide and related user manuals include civilian agency guidance, this chapter has been revised to reference the CPARS website and guidance, as well as removing outdated and duplicative guidance.

  16. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    6 $382,721 $0 FY2017 $365,531 $0 FY2018 $139,591 $0 Cumulative Fee $887,843 $0 EM Contractor Fee Oak Ridge Office - Oak Ridge, TN Transuranic Waste Processing Contract June 2016 Cost Plus Award Fee/ Firm Fixed Price/ Indefinite Delivery Indefinite Quantity $887,843 North Wind Solutions, LLC DE-EM0003760 October 19, 2015 - October 26, 2018 Option 1: October 27, 2018 - October 26, 2020 $138,289,924 Fee Information $0

  17. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment and Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2015, to December 31, 2015 Basis of Evaluation: 2015 Performance Evaluation and Measurement Plan Award Fee Available: $12,600,000 Award Fee Earned: $8,310,000 (66.0* percent) Incentive B.1 - Award Fee-Project Management - Good The fee for Project

  18. Acquisition Guide, Chapter 42.15, Contractor Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapter has been updated to make revisions to the Contractor Performance Assessment Reporting System guidance and includes incorporating Federal Acquisition Regulation (FAR) changes through Federal Acquisition Circular (FAC) 2005-46. Most significant revisions are the change in the reporting thresholds for awards issued on or after October 1, 2010, and additional information on registering a contract or order either manually or auto register.

  19. Report on audit of Department of Energy`s contractor salary increase fund

    SciTech Connect (OSTI)

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractor employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.

  20. Common Air Conditioner Problems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Common Air Conditioner Problems Common Air Conditioner Problems A refrigerant leak is one common air conditioning problem. | Photo courtesy of ©iStockphoto/BanksPhotos. A refrigerant leak is one common air conditioning problem. | Photo courtesy of ©iStockphoto/BanksPhotos. One of the most common air conditioning problems is improper operation. If your air conditioner is on, be sure to close your home's windows and outside doors. For room air conditioners, isolate the room or a group of

  1. Measure Guideline: Guide to Attic Air Sealing

    SciTech Connect (OSTI)

    Lstiburek, J.

    2014-09-01

    The Guide to Attic Air Sealing was completed in 2010 and although not in the standard Measure Guideline format, is intended to be a Measure Guideline on Attic Air Sealing. The guide was reviewed during two industry stakeholders meetings held on December 18th, 2009 and January 15th, 2010, and modified based on the comments received. Please do not make comments on the Building America format of this document. The purpose of the Guide to Attic Air Sealing is to provide information and recommendations for the preparation work necessary prior to adding attic insulation. Even though the purpose of this guide is to save energy - health, safety and durability should not be compromised by energy efficiency. Accordingly, combustion safety and ventilation for indoor air quality are addressed first. Durability and attic ventilation then follow. Finally, to maximize energy savings, air sealing is completed prior to insulating. The guide is intended for home remodelers, builders, insulation contractors, mechanical contractors, general contractors who have previously done remodeling and homeowners as a guide to the work that needs to be done.

  2. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  3. Technical assistance contractor management plan: Surface and ground water

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  4. SF 2001-WLD;CONTRACTOR WELDING, CUTTING AND BRAZING

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01-WLD (11-2012) Supersedes (4-2010) Issue CONTRACTOR WELDING, CUTTING, BRAZING P ART 1: CO NT R ACT O R' S E X PO S UR E AS S E S SM ENT Identify what welding, cutting and/or brazing you are doing: (Check box or fill-in type below) Welding Thermal Cutting Brazing (No cadmium filler BAg-1 or BAg- 2; Silver not to exceed 45%) MIG Oxy-acetylene Oxy-acetylene TIG Stick Plasma arc Other Identify the base metal you are welding, cutting or brazing: (Check box or fill-in below) Carbon steel Galvanized

  5. Specification for HEPA Filters Used by DOE Contractors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3020-2015 June 2015 Supersedes DOE-STD-3020-2005 December 2005 DOE TECHNICAL STANDARD Specification for HEPA Filters Used by DOE Contractors U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-3020-2015 i This document is available on the Department of Energy Technical Standards Program Web page at http://www.energy.gov/ehss/services/nuclear-safety/department-energy-technical-standards- program

  6. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Earned FY2012 $475,395 $418,348 FY2013 $1,141,987 $1,096,308 FY2014 $1,401,951 $1,121,562 FY2015 $1,494,810 $1,255,640 FY2016 $1,519,630 Cumulative Fee $6,033,773 $3,891,858 $6,033,773 Portage, Inc. DE-DT0002936 N/A Cost Plus Award Fee $138,581,761 November 4, 2011 - September 30, 2016 $0 EM Contractor Fee Moab Uranium Mill Tailings - Moab, UT Moab Uranium Mill Tailings Remedial Action Contract June 2016 Fee Information

  7. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    3 $8,192,895 $7,892,519 FY2014 $8,192,895 $561,266 FY2015 $13,665,946 $9,194,460 FY2016 $12,322,570 $175,000 FY2017 $7,646,702 Cumulative Fee $50,021,008 $17,823,245 EM Contractor Fee Carlsbad Field Office - Carlsbad, NM Waste Isolation Pilot Plant Operations June 2016 October 1, 2012 - September 30, 2017 $0 $1,658,536,663 Fee Information $50,021,008 Option 1: 10/1/17 - 9/30/22 Cost Plus Award Fee DE-EM0001971 Nuclear Waste Partnership, LLC

  8. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Earned FY 2011 $0 $0 FY 2012 $2,857,830 $2,762,134 FY 2013 $3,258,260 $3,108,260 FY 2014 $3,258,260 $3,312,986 FY 2015 $6,555,406 $5,316,753 FY 2016 $3,420,208 $1,888,494 Cumulative Fee $19,349,964 $16,388,627 EM Contractor Fee Idaho Operations Office - Idaho Falls, ID Advanced Mixed Waste Treatment Project June 2016 $0 N/A Cost Plus Award Fee $510,431,946 Idaho Treatment Group LLC DE-EM0001467 $19,349,964 Fee Information October 2011 - March 2016

  9. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Target Fee Maximum Fee Performance Period Fee Available Fee Earned FY2016 $10,927,232 $0 FY2017 $9,425,676 $0 Cumulative Fee $20,352,908 $0 EM Contractor Fee Los Alamos Los Alamos Legacy Cleanup Bridge Contract June 2016 $20,260,892 CPAF Los Alamos National Security LLC $311,633,688 DE-EM0003528 $0 Fee Information September 30, 2015 - September 30, 2016 $0 October 1, 2016 - March 31, 2017 (Option Period 1) April 1, 2017 - September 30, 2017 (Option Period 2)

  10. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Contractor: Contract Number: Contract Type: Total Estimated Contract Cost: Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2011 $6,190,992 $5,779,687 FY2012 $16,380,944 $14,173,044 FY2013 $16,972,816 $12,693,413 FY2014 $15,520,007 $13,207,526 FY2015 $14,269,197 $10,503,998 FY2016 Base Period $24,350,863 March 29, 2016- September 30, 2017 $28,251,114 $6,823,811 October 1, 2017- September 30, 2018 $18,834,076 October 1, 2018-

  11. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2015 $6,170,759 $4,257,824 FY2016 $5,553,915 $0 FY2017 $5,553,915 0 Cumulative Fee $17,278,589 $4,257,824 DE-EM0001131-DE-DT0007774 EM Contractor Fee June 2016 Portsmouth Paducah Project Office Paducah Deactivation Task Order Fluor Federal Services $17,278,589 N/A $0 Cost Plus Award Fee and FFP $422,000,000 July 22, 2014 - July 21, 2017 Fee Information

  12. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2014 $389,929 $358,735 FY2015 $392,092 $360,725 FY2016 $397,054 FY2017 (Option) $0 FY2018 (Option) $0 Cumulative Fee $1,179,075 $719,460 $1,179,075 Cost Plus Award Fee $51,615,957 October 1, 2013 - September 30, 2016 Fee Information $0 Option 1: 10/1/16 - 9/30/18 DE-EM0002639 EM Contractor Fee June 2016 Portsmouth Paducah Project Office Portsmouth Environmental Technical Services II Restoration Services Inc

  13. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Availability Fee Earned FY2013 $300,000 $284,250 FY2014 $310,000 $280,705 FY2015 $320,000 $287,680 FY2016 $330,000 FY2017 $340,000 FY2018 $350,000 Cumulative Fee $1,950,000 $852,635 EM Contractor Fee Richland Operations Office - Richland, WA Occupational Medical Services at Hanford June 2016 $100,100,000 $1,950,000 Option 2: 10/1/15 -9/30/16 (Exercised) HPM Corporation DE-EM0002043 Firm Fixed Price Plus Award Fee Fee Information $0 October 1, 2012 -

  14. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2014 to June 30, 2014 Basis of Evaluation: 2014-A Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $3,970,000 (63.0%) Incentive B.1 - Award Fee-Project Management The fee for Project Management is divided into three Award Fee Objectives

  15. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: July 1, 2014 to December 31, 2014 Basis of Evaluation: 2014-B Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $4,095,000 (65.0%) Incentive B.1 - Award Fee-Project Management - Good The fee for Project Management

  16. Acquisition Guide Chapter 9.4, Contractor Responsibility Determinations

    Broader source: Energy.gov [DOE]

    Attached is new Acquisition Guide Chapter 9.4, Contractor Responsibility Determinations. This Chapter is being issued to address recommendations from a recent Inspector General (IG) report that found DOE Contracting Officers (CO) were not always conducting responsibility determinations properly. In particular, the IG found that for sole source awards, including 8(a) awards, the CO was not documenting reviews of past performance. The IG recommended that COs consistently follow existing FAR requirements for completing responsibility determinations. This Chapter reiterates and summarizes current FAR requirements for doing so.

  17. CONTRACTOR AND ADDRESS COEPPRACT FOR: TERM: COMMT.SSION OBLIGATION

    Office of Legacy Management (LM)

    CONTRACTOR AND ADDRESS COEPPRACT FOR: TERM: COMMT.SSION OBLIGATION PAYMENT TO m MADE BY: CONTRACT NO. AT(30-l)-1247 CONTRACT pl AMERICAN MACHINE Ah'D FOUNDRY COMP'N' Second Avenue and 56th Street Brooklyn, New York MA$HR\?No AND OTHER WORK AND SERVICES August o' 19% to December 31 9 0 'lyj! 512O,ox).OO Division of Disbursement, United States Treasury Department,' New York, New York. Subn-it invoices to: United States Atomic Energy Corrcni&ion, P. 0. %x 30, Ansonia Station New York 23, l!tw

  18. Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Centerra-Savannah River Site Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2015 - March 31, 2016 Basis of Evaluation: Award Fee Plan Award Fee Available: $2,962,624.50 Award Fee Earned: $2,814,493.20 Award Fee Area Adjectival Ratings: Protective Force Operations and Training (45% of total available) The Contractor shall provide a well-trained, highly motivated Protective Force (PF) capable of reliably executing routine and emergency

  19. LABORATORY EVALUATION OF AIR FLOW MEASUREMENT METHODS FOR RESIDENTIAL HVAC RETURNS

    SciTech Connect (OSTI)

    Walker, Iain; Stratton, Chris

    2015-02-01

    This project improved the accuracy of air flow measurements used in commissioning California heating and air conditioning systems in Title 24 (Building and Appliance Efficiency Standards), thereby improving system performance and efficiency of California residences. The research team at Lawrence Berkeley National Laboratory addressed the issue that typical tools used by contractors in the field to test air flows may not be accurate enough to measure return flows used in Title 24 applications. The team developed guidance on performance of current diagnostics as well as a draft test method for use in future evaluations. The series of tests performed measured air flow using a range of techniques and devices. The measured air flows were compared to reference air flow measurements using inline air flow meters built into the test apparatus. The experimental results showed that some devices had reasonable results (typical errors of 5 percent or less) but others had much bigger errors (up to 25 percent). Because manufacturers’ accuracy estimates for their equipment do not include many of the sources of error found in actual field measurements (and replicated in the laboratory testing in this study) it is essential for a test method that could be used to determine the actual uncertainty in this specific application. The study team prepared a draft test method through ASTM International to determine the uncertainty of air flow measurements at residential heating ventilation and air conditioning returns and other terminals. This test method, when finalized, can be used by the Energy Commission and other entities to specify required accuracy of measurement devices used to show compliance with standards.

  20. Measure Guideline. Air Sealing Attics in Multifamily Buildings

    SciTech Connect (OSTI)

    Otis, Casey; Maxwell, Sean

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.