Powered by Deep Web Technologies
Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Electric Power Research Institute EPRI | Open Energy Information  

Open Energy Info (EERE)

Research Institute EPRI Jump to: navigation, search Name Electric Power Research Institute (EPRI) Place Palo Alto, California Zip 94304 Product EPRI is an independent, non-profit...

2

DOE/EPRI 2013 Electricity Storage Handbook in Collaboration with...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPRI 2013 Electricity Storage Handbook in Collaboration with NRECA (July 2013) DOEEPRI 2013 Electricity Storage Handbook in Collaboration with NRECA (July 2013) The Electricity...

3

EPRI Ergonomics Handbook for the Electric Power Industry  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Occupational Health and Safety (OHS) Program has provided ergonomic information to the electric energy industry workforce since 1999. This report specifically focuses on the design of substations and interventions for tasks performed by substation operators and maintenance workers as well as overhead and underground distribution workers. Substation and field distribution line work is physically strenuous and can expose workers to musculoskeletal disorders (MSD...

2010-10-20T23:59:59.000Z

4

DOE-NETL Electric Utility-Water R&D Program EPRI Water Advisory  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Utility-Water R&D Program EPRI Water Advisory Council September 25, 2002 Milwaukee, WI Thomas J. Feeley, III, Product Manager Innovations for Existing Plants TJFEPRI...

5

Illinois Municipal Electric Agency - Electric Efficiency Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Agency - Electric Efficiency Program < Back Eligibility Agricultural Commercial Industrial Institutional Municipal Utility Nonprofit Schools Savings Category Home...

6

Energy Storage In a Restructured Electric Industry: Report on EPRI Think Tank III  

Science Conference Proceedings (OSTI)

This report -- "Energy Storage in a Restructured Electric Industry" -- summarizes the third of a series of Think Tanks sponsored by EPRI on energy storage in a deregulated electric utility industry.

2002-06-10T23:59:59.000Z

7

2001 EPRI International Maintenance Conference: Maintaining Reliable Electric Generation  

Science Conference Proceedings (OSTI)

EPRI's Energy Conversion Division organized and presented a three-day conference on fossil and nuclear generation plant maintenance during August 2001, in Houston, Texas. This CD presents the proceedings of that conference.

2001-07-24T23:59:59.000Z

8

EPRI EMF Exposure Database: Electrical Workers Data Set  

Science Conference Proceedings (OSTI)

Researchers at the University of Southern California (USC) provided data from the EPRI-sponsored Assessment of Electromagnetic Fields Exposure by Job Title Study (WO799-27) for inclusion in the EPRI EMF Exposure Database. This data set contains six data products related to measurements of magnetic field exposure and estimates of time performing specific tasks: binary and ASCII time-series files of individual measurements, summaries of each task, summaries of each type of task within a measurement session...

1996-11-13T23:59:59.000Z

9

EPRI Ergonomics Handbook for the Electric Power Industry: Ergonomic Interventions for Electrical Workers in Fossil-Fueled Power Plan ts  

Science Conference Proceedings (OSTI)

The EPRI Occupational Health and Safety (OHS) Research Program has provided ergonomic information to the electric energy industry workforce since 1999. This is the fourth EPRI ergonomics handbook; it specifically focuses on tasks performed by electricians who work in fossil-fueled electric power plants. Fossil-fueled power plant electrical work is physically strenuous and can expose workers to musculoskeletal disorders (MSDs), such as carpal tunnel syndrome, low-back pain, or shoulder tendonitis. In an e...

2008-01-11T23:59:59.000Z

10

DOE/EPRI 2013 Electricity Storage Handbook in Collaboration with NRECA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPRI 2013 Electricity Storage Handbook in Collaboration with EPRI 2013 Electricity Storage Handbook in Collaboration with NRECA (July 2013) DOE/EPRI 2013 Electricity Storage Handbook in Collaboration with NRECA (July 2013) The Electricity Storage Handbook is a how-to guide for utility and rural cooperative engineers, planners, and decision makers to plan and implement energy storage projects. The Handbook also serves as an information resource for investors and venture capitalists, providing the latest developments in technologies and tools to guide their evaluations of energy storage opportunities. It includes a comprehensive database of the cost of current storage systems in a wide variety of electric utility and customer services, along with interconnection schematics. A list of significant past and present energy storage projects is provided for a practical

11

EPRI Ergonomics Handbook for the Electric Power Industry: Ergonomic Design Handbook for Fossil-Fueled Electric Generating Stations  

Science Conference Proceedings (OSTI)

The EPRI Occupational Health and Safety (OHS) Research Program has provided ergonomic information to the electric energy industry workforce since 1999. This is the fifth EPRI ergonomics handbook; it provides a framework and specific guidelines for decisionmaking that will apply ergonomic principles to the design of electric generating stations. Fossil-fueled power plant operation and maintenance is physically strenuous, and it may contribute to development of musculoskeletal disorders (MSDs) such as carp...

2008-03-11T23:59:59.000Z

12

Fuel Inventory Management for Electric Companies: Current Uses of the EPRI Utility Fuel Inventory Model (UFIM)  

Science Conference Proceedings (OSTI)

This report describes current applications of the Utility Fuel Inventory Model (UFIM) developed by the Electric Power Research Institute (EPRI). This model is designed to help electric companies to better manage policy and operational decisions related to managing power plant fuel inventories. This report specifically address: (i) problems currently faced by electric power companies where fuel inventories can be used to address the problems; and, (ii) how the UFIM analysis tool can be used to ...

2013-07-26T23:59:59.000Z

13

EPRI Electric GSE Market Penetration Issues Round Table Proceedings: September 2001  

SciTech Connect

Due to the unfortunate incidents of September 11, 2001, the EPRI Electric GSE Market Penetration Issues Round Table Meeting scheduled to be held in Washington, D.C. was canceled. However, these meetings are vital to bring together the players in the electric ground support equipment industry that identify and address key issues surrounding the deployment of electric GSE. These meeting proceedings are the presentations that were to be used by the speakers of this meeting.

None

2001-11-01T23:59:59.000Z

14

Integrating Distributed Resources into Electric Utility Distribution Systems: EPRI White Paper  

Science Conference Proceedings (OSTI)

This EPRI white paper is about understanding electric power engineering issues related to integrating distributed resources (DR) into utility distribution systems. It is an overview designed for all stakeholders rather than a rigorous technical engineering guide. A major goal of the paper is to move discussion of integration issues toward solutions.

2001-12-14T23:59:59.000Z

15

EPRI/GRI Load Shape Workshop: Load Data Analysis for Gas and Electric Markets  

Science Conference Proceedings (OSTI)

Load shapes, representing usage patterns in the electric and gas industry, are a key factor in energy company operations and management. In the emerging restructured energy market, retail energy suppliers market energy to final customers and must arrange for electricity generation or gas delivery to meet their customers' needs. EPRI and GRI sponsored a two-day workshop in June, 1999 that addressed a range of issues associated with load shapes, including modeling, profiling for retail market settlement, r...

1999-11-10T23:59:59.000Z

16

Energy Storage in a Restructured Electric Utility Industry: Report on EPRI Think Tanks I and II  

Science Conference Proceedings (OSTI)

Energy storage will play an increasingly crucial role in the deregulated electric power industry, with future generation probably decreasing in size and becoming more distributed. EPRI sponsored two think tanks to explore the need for energy storage in a deregulated environment and to assess the state of development of energy storage technologies. The think tanks described the U.S. Federal Energy Regulatory Commission (FERC) view of deregulation and how electric utility deregulation compares to the dereg...

1997-09-30T23:59:59.000Z

17

Electric Power Research Institute (EPRI) Hydrogen Briefing to...  

NLE Websites -- All DOE Office Websites (Extended Search)

and in the coming years. * Detailed business case analysis were done for: Entergy, Xcel, and Southern Company 4 Copyright 2008 Electric Power Research Institute,Inc All...

18

EPRI Ergonomics Handbook for the Electric Power Industry: : Ergonomic Design and Specification of Turnkey and Upfitted Fleet Vehicles  

Science Conference Proceedings (OSTI)

The second of two Electric Power Research Institute (EPRI) ergonomics handbooks focusing on fleet vehicles used by electric power utilities, EPRI Ergonomics Handbook for the Electric Power Industry: Ergonomic Design and Specification of Turnkey and Upfitted Fleet Vehicles offers best practices and recommendations for specific design features of fleet vehicles. The first handbook presented information about the process for specifying and purchasing fleet vehicles. Both of these handbooks are ...

2012-11-07T23:59:59.000Z

19

Reliability of Electric Utility Distribution Systems: EPRI White Paper  

Science Conference Proceedings (OSTI)

This report discusses what is known about electric power distribution system reliability and investigates whether there are generally available methods for performing reliability analysis for distribution systems. The theory of the reliability of general systems is well understood. A fundamental issue is whether an appropriate implementation of the theory exists in a form readily usable by distribution system planners and designers.

2000-10-17T23:59:59.000Z

20

EPRI Comments on Proposed Effluent Limitations Guidelines Rule  

Science Conference Proceedings (OSTI)

On September 20, 2013, the Electric Power Research Institute (EPRI) submitted comments to the U.S. Environmental Protection Agency (EPA) on its proposed Effluent Guidelines rule.[1]  The proposed rule aims to reduce the amount of toxic metals and other constituents discharged to surface waters from power plants. EPRI’s comments to EPA address fundamental scientific and technical questions about the cost-effectiveness of proposed flue gas desulfurization (FGD) wastewater treatment, the ...

2013-10-22T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EPRI Occupational Health and Safety Annual Report 2003: Injury and Illness Among the Electric Energy Workforce, 1995-2002  

Science Conference Proceedings (OSTI)

Although injury rates among some sectors of the electric energy workforce are higher than in many other industries, there is no comprehensive, nationwide surveillance system for reporting and monitoring occupational injury/illness data for the electric energy industry. EPRI has established an ongoing Occupational Health Surveillance Database to provide detailed information about workplace injury and illness among the electric energy workforce. The database facilitates epidemiological monitoring, ongoing ...

2004-02-24T23:59:59.000Z

22

EPRI Live Working Project  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has been conducting research in the area of live working for several decades. This research has resulted in a large number of reports and other products. To help users locate the results of EPRI’s research in live working, an annual update is prepared containing brief descriptions of the products.BackgroundLive work—the performance of maintenance, construction, or testing on equipment and circuits that ...

2012-09-06T23:59:59.000Z

23

EPRI Substation Grounding Project  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has been conducting research in the area of substation grounding and fault current management for several decades. This research has resulted in a large number of reports and other products. To help users locate the results of EPRI’s research in substation grounding and fault current management, an annual update is prepared containing brief descriptions of the products.ObjectiveThe objective of this report is ...

2012-09-06T23:59:59.000Z

24

Alternative Fuels Data Center: State Agency Electric Vehicle Supply  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

State Agency Electric State Agency Electric Vehicle Supply Equipment (EVSE) Installation to someone by E-mail Share Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Facebook Tweet about Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Twitter Bookmark Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Google Bookmark Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Delicious Rank Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Digg Find More places to share Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on

25

Alternative Fuels Data Center: State Agency Electric Vehicle Supply  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

State Agency Electric State Agency Electric Vehicle Supply Equipment (EVSE) Installation to someone by E-mail Share Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Facebook Tweet about Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Twitter Bookmark Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Google Bookmark Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Delicious Rank Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on Digg Find More places to share Alternative Fuels Data Center: State Agency Electric Vehicle Supply Equipment (EVSE) Installation on

26

EPRI Regional Haze Research  

Science Conference Proceedings (OSTI)

During the last decade, EPRI has investigated ways to improve the scientific basis for various steps required under the U.S. Environmental Protection Agency's (US EPA's) 1999 Regional Haze Regulations (RHR). Those regulations require mitigating visibility impairment in mandatory Class I areaslarger national parks and wilderness areasattributable to manmade air pollution by 2064. Several technical issues have arisen while interpreting the implementation process of the RHR. This report describes EPRI and o...

2007-03-27T23:59:59.000Z

27

EPRI Ergonomics Handbook for the Electric Power Industry: Ergonomic Interventions for Plant Operators and Mechanics in Fossil-Fueled Generating Stations  

Science Conference Proceedings (OSTI)

The EPRI Occupational Health and Safety (OHS) Committee Research Program has provided ergonomic information to the electric energy industry workforce since 1999. This is the sixth EPRI ergonomics handbook; it specifically focuses on tasks performed by plant operators and mechanics working in fossil-fueled generating stations and also addresses some tasks performed by steam services technicians. Fossil-fueled generating station operational and mechanical work is physically strenuous and can expose workers...

2008-12-15T23:59:59.000Z

28

EPRI | OpenEI  

Open Energy Info (EERE)

EPRI EPRI Dataset Summary Description This project estimates the naturally available and technically recoverable U.S. wave energy resources, using a 51-month Wavewatch III hindcast database developed especially for this study by National Oceanographic and Atmospheric Administration's (NOAA's) National Centers for Environmental Prediction. For total resource estimation, wave power density in terms of kilowatts per meter is aggregated across a unit diameter circle. Source Electric Power Research Institute (EPRI) Date Released December 05th, 2011 (2 years ago) Date Updated Unknown Keywords EPRI MHK NREL ocean Virginia Tech wave wave power density Data application/pdf icon Download Full Report (pdf, 8.8 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

29

EPRI Smart Grid Roadmap Workshop  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) hosted the third Smart Grid Roadmap Workshop on August 7 and 8, 2012, at EPRI’s office in Palo Alto, California. The objective of the workshop was to bring together the people responsible for developing and maintaining the smart grid roadmaps for their companies in order to encourage dialogue about their experiences, share lessons learned and best practices, and discuss topics of mutual interest. Workshop participants presented on their ...

2012-10-04T23:59:59.000Z

30

EPRI-Marshall Electric Motor-Operated Valve (Block Valve) Interim Test Data Report  

Science Conference Proceedings (OSTI)

At the request of participating PWR utilities, an overall program was developed at EPRI for the full-scale testing of a representative set of primary-system safety and relief valves. The program was to assist the PWR utilities in meeting NUREG 0737, Item II.D.1.A requirements. Although not a formal part of the program, some block valve operability data were also obtained during the relief valve testing performed at Marshall Steam Station in Terrell, North Carolina. A total of seven block valve designs we...

1982-07-01T23:59:59.000Z

31

Department of Energy, Duke Energy and EPRI Partner to Test Advanced Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Duke Energy and EPRI Partner to Test Advanced Energy, Duke Energy and EPRI Partner to Test Advanced Energy Technologies for Utilities Department of Energy, Duke Energy and EPRI Partner to Test Advanced Energy Technologies for Utilities April 14, 2011 - 12:00am Addthis Washington, DC - The Department of Energy's Advanced Research Projects Agency-Energy (ARPA-E) has signed a partnership deal with Duke Energy, one of the largest electric power companies in the United States, and with the Electric Power Research Institute (EPRI), a non-profit research organization that focuses on the electric power utility industry in the U.S. and abroad, to identify opportunities for testing and deploying ARPA-E funded projects that will bolster the electric grid. Through the Memorandum of Understanding (MOU), ARPA-E, Duke Energy, and

32

EPRI Ergonomics Handbook for the Electric Power Industry: Process Guidelines for Vehicle Acquisition and Maintenance and Ergonomics Guidelines for Vehicle Maintenance  

Science Conference Proceedings (OSTI)

This report is the first of two Electric Power Research Institute (EPRI) ergonomics handbooks focusing on fleet vehicles used by electric power utilities and offers best ergonomics practices for fleet process and vehicle maintenance. The second handbook, which will be available in 2012, will present specific design feature recommendations for fleet vehicles. These handbooks are intended for use by fleet and operational personnel who have a role and interest in the design, upfitting, selection, ...

2011-11-03T23:59:59.000Z

33

EPRI EMF Exposure Database: University of North Carolina (UNC) Electrical Utility Worker Data Set  

Science Conference Proceedings (OSTI)

The University of North Carolina (UNC) Electrical Utility Worker Data Set contains measurement data collected during an epidemiologic study of leukemia and brain cancer mortality among nearly 139,000 men employed at five U.S. electric utilities. The data set contains eight data products related to measurements of magnetic field personal exposure. This document describes the UNC data products and provides a common set of statistical parameters, facilitating this study's comparison with other data sets in ...

1998-11-09T23:59:59.000Z

34

A Review of the Reliability of Electric Distribution System Components: EPRI White Paper  

Science Conference Proceedings (OSTI)

This report discusses available literature, data, and models related to the reliability of electric power distribution system components and discusses the influence of environmental factors and testing results on component reliability. It also critiques the value of this information for value of service studies.

2001-12-13T23:59:59.000Z

35

EPRI Journal, Spring 2013  

Science Conference Proceedings (OSTI)

The EPRI Journal is the flagship publication of the Electric Power Research Institute. The Spring 2013 issue (3002000916) includes a cover story on customer resilience, as well as features on CoSeq™ sequestration resin for accelerating cleanup of nuclear power plant coolant, TERESA and fine particles in the real world, mitigating the effects of cycling on environmental control equipment, and opportunities presented by a smarter grid and its growing data streams.

2013-05-13T23:59:59.000Z

36

EPRI Transformer Guidebook Development  

Science Conference Proceedings (OSTI)

Utilities are losing many of their subject matter experts through retirement and downsizing. This is particularly true in the case of power transformers, so that there is now a critical need for a comprehensive transformer reference book geared toward utility engineers. In 2007, the Electric Power Research Institute EPRI published the technical update report Transformer Guidebook Design 1013799. That report described the results of the initial project to develop the Copper Book, a comprehensive reference...

2009-12-23T23:59:59.000Z

37

EPRI Live Working Reference Book Edition 2  

Science Conference Proceedings (OSTI)

This report contains updated information on the 2012 edition of the National Electrical Safety Code (NESC) and on glass insulators that became available after publication of the first edition of the Tan Book (Electric Power Research Institute [EPRI] report 1018974) in 2009. The 2009 first edition of the this report was a fully revised, updated, and expanded version of the Live Working Guide for Overhead Lines (EPRI report 1008747), published in 2004. The new EPRI Live Working Reference Book provides the ...

2011-11-02T23:59:59.000Z

38

EPRI Electric Transportation Analysis & Economic Development Roadmap for the Greater Cleveland Area  

Science Conference Proceedings (OSTI)

U.S. dependence on foreign petroleum has reached a point at which it directly impacts the nation's security and economic well-being. Public policy makers and industry are striving to reduce this dependence in the transportation sector, which remains the largest consumer of imported petroleum products. Electricity has the potential to become the leading energy source to displace petroleum use for vehicles because of its availability, reliability, cost, and ability to expand with U.S. resources as demand e...

2009-07-30T23:59:59.000Z

39

EPRI Distribution Reliability Practices Repository  

Science Conference Proceedings (OSTI)

 A key objective of the Electric Power Research Institute’s (EPRI’s) research into distribution reliability practices is to identify, document, and provide practice summary descriptions to research participants in a format that facilitates comparison and aids decision makers in identifying the practices in place at other utilities that can be applied to a decision maker’s utility to improve performance.This report presents distribution reliability practice results ...

2012-10-19T23:59:59.000Z

40

Classic articles and workbook: EPRI monographs on simulation of electric power production  

SciTech Connect

This monograph republishes several articles including a seminal one on probabilistic production costing for electric power generation. That article is given in the original French along with a English translation. Another article, written by R. Booth, gives a popular explanation of the theory, and a workbook by B. Manhire is included that carries through a simple example step by step. The classical analysis of non-probabilistic generator dispatch by L.K. Kirchmayer is republished along with an introductory essay by J.P. Stremel that puts in perspective the monograph material. The article in French was written by H. Baleriaux, E. Jamoulle, and Fr. Linard de Guertechin and first published in Brussels in 1967. It derived a method for calculating the expected value of production costs by modifying a load duration curve through the use of probability factors that account for unplanned random generator outages. Although the paper showed how pump storage plants could be included and how linear programming could be applied, the convolution technique used in the probabilistic calculations is the part most widely applied. The tutorial paper by Booth was written in a light style, and its lucidity helped popularize the method. The workbook by Manhire also shows how the calculation can be shortened significantly using cumulants to approximate the load duration curve.

Stremel, J.P. (ed.)

1991-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Proceedings of 2009 KEPRI-EPRI Joint Superconductivity Conference  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) and Korea Electric Power Research Institute (KEPRI) held the 2009 KEPRI-EPRI Joint Superconductivity Conference on November 1618, 2009 in Daejeon, Korea at KEPRIs facilities. The conference was the ninth in EPRIs series of annual superconductivity conferences. KEPRI, which is the research center of Korea Electric Power Corporation, cosponsored the event with EPRIs Superconductivity Program. The Korea Institute of Applied Superconductivity and Cryogenics was th...

2010-02-25T23:59:59.000Z

42

Pulsed Electric Field and High Hydrostatic Pressure: Proceedings of EPRI/Army Sponsored Workshop, Moscow, Idaho -- April 19-21, 1999  

Science Conference Proceedings (OSTI)

The Pulsed Electric Field and High Hydrostatic Pressure EPRI/Army Sponsored Workshop was held april 19-21, 1999 in Moscow, Idaho. The short course/workshop, the 4th in a series begun to disseminate and understand the latest advances in Pulsed Electric Field technologies was expanded this year to include High Hydrostatic Pressure. As a part of the Workshop, emphasis was placed on the importance of the newly formed IFT Nonthermal Processing Division. This report is comprised of an overview of the short cou...

1999-11-24T23:59:59.000Z

43

Proceedings From the EPRI Workshop on 316(a) Issues: Technical and Regulatory Considerations: October 16-17, 2003  

Science Conference Proceedings (OSTI)

This report documents the proceedings of a recent workshop co-organized by American Electric Power (AEP) and EPRI on thermal discharge issues. Thermal discharge issues are receiving increasing attention from government agencies and electric power generating companies. This report examines recent developments and future trends.

2004-09-20T23:59:59.000Z

44

Program on Technology Innovation: EPRI Nanotechnology Workshop  

Science Conference Proceedings (OSTI)

This report contains the proceedings of the EPRI Nanotechnology Workshop held December 1415, 2005, in Charlotte, North Carolina. The workshop provided a forum for the discussion of ongoing EPRI and electric power industry research involving nanotechnology, possible applications from academia research, and future research and development (R&D) needs. Additionally, the role of EPRI in developing and implementing nanotechnology was discussed in several key application areas.

2006-05-30T23:59:59.000Z

45

Proceedings of 8th Annual EPRI Superconductivity Conference  

Science Conference Proceedings (OSTI)

The Electric Power Research Institutes EPRIs Eighth Annual EPRI Superconductivity ConferencePower Delivery Applications for Superconductivitywas held November 1213, 2008 in Oak Ridge, Tennessee at the Doubletree Hotel Oak Ridge. The U.S. Department of Energy DOE and Oak Ridge National Laboratory co-sponsored the event with EPRIs Superconductivity Program. This report contains the papers presented at the conference.

2008-12-23T23:59:59.000Z

46

EPRI Global LLW Profile - Generation, Treatment, Conditioning, and Disposition  

Science Conference Proceedings (OSTI)

In the past several years, the Electric Power Research Institute’s (EPRI’s) international membership has expanded significantly. As EPRI’s membership demographics shift, the absence of a comprehensive global understanding of low level waste (LLW) practices limits our ability to effectively provide technically accurate dialogue and assistance. Understanding LLW waste generation, classification, packaging, treatment, conditioning and disposition profiles is imperative when providing ...

2012-11-29T23:59:59.000Z

47

EPRI Maintenance Excellence Matrix Revision Status  

Science Conference Proceedings (OSTI)

This report documents the progress in revising the Electric Power Research Institute EPRI 2002 Report 1004705, Maintenance Excellence Matrix Assessment Guideline for Fossil Power Plants, which provides utilities a comprehensive self-assessment guideline for improving maintenance processes.

2008-12-23T23:59:59.000Z

48

EPRI Workshop on EMF and Aquatic Life  

Science Conference Proceedings (OSTI)

A workshop on Electric and Magnetic Fields (EMF) and Aquatic Life was organized by the Electric Power Research Institute (EPRI) and held on November 15, 2012, at the Monterey Bay Aquarium Research Institute (MBARI) in Moss Landing, California. The purpose of the workshop was to help EPRI identify research needs regarding the potential impact of EMF from offshore energy generation and/or underwater transmission cables on various forms of aquatic life. The workshop participants reviewed the current ...

2013-04-10T23:59:59.000Z

49

Program on Technology Innovation: Using Scenario Planning to “Stress Test” EPRI’s Research and Development Portfolio  

Science Conference Proceedings (OSTI)

Working closely with electricity industry, public advisors, and the Electric Power Research Institute (EPRI) Board of Directors, EPRI has developed a research and development (R&D) roadmap for overarching strategic issues that offers both opportunities and challenges to the continued delivery of reliable, affordable, and environmentally responsible electricity. EPRI has subsequently identified key R&D challenges and action plans to respond to this roadmap.This report summarizes a ...

2013-05-14T23:59:59.000Z

50

Nondestructive Evaluation: 18th Annual EPRI NDE Issues Meeting Notes  

Science Conference Proceedings (OSTI)

The annual Electric Power Research Institute (EPRI) Nondestructive Evaluation (NDE) Issues Meeting provides a forum for participants to discuss and exchange information concerning current and emerging NDE issues.

2008-09-01T23:59:59.000Z

51

Nondestructive Evaluation: 19th Annual EPRI NDE Issues Meeting Notes  

Science Conference Proceedings (OSTI)

The annual Electric Power Research Institute (EPRI) Nondestructive Evaluation (NDE) Issues Meeting provides a forum for participants to discuss and exchange information concerning current and emerging NDE issues.

2009-08-24T23:59:59.000Z

52

NREL: Technology Transfer - EPRI Joins SolarTAC  

EPRI Joins SolarTAC June 10, 2010. On May 26, the Solar Technology Acceleration Center (SolarTAC) announced that the Electric Power Research Institute ...

53

Proceedings: 2012 EPRI Groundwater Protection Workshop, In Collaboration with the Nuclear Energy Institute  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) organized the 2012 EPRI Groundwater Protection Workshop in collaboration with the Nuclear Energy Institute (NEI). The workshop focused on nuclear plant leak prevention, groundwater monitoring and remediation techniques, and industry experience.BackgroundEPRI has conducted 13 such topical workshops over the past decade. In 2005, EPRI conducted a decommissioning topical workshop on groundwater contamination ...

2013-05-02T23:59:59.000Z

54

Proceedings from EPRI's XV Substation Diagnostic Conference  

Science Conference Proceedings (OSTI)

The EPRI Substation Equipment Diagnostics Conference XV convened in Orlando, Florida, from March 2 5, 2008, to assemble, assess, and communicate information on the latest diagnostic techniques, monitoring devices, and systems for substation equipment. This conference was the fifteenth in a series that began in 1992. It focused on the latest monitoring and diagnostic techniques being developed by EPRI and others in research programs, as well as equipment and programs now available and in service by electr...

2008-04-28T23:59:59.000Z

55

Hazards to Electrical Distribution in Coastal Areas Subject to Flooding and High Wind  

Science Conference Proceedings (OSTI)

EPRI, Dewberry and Davis, and the Federal Emergency Management Agency (FEMA) have jointly prepared this study on hazards to electrical distribution in coastal areas that experience coastal and river flooding and high wind.

2000-09-08T23:59:59.000Z

56

EPRI and TVA: 35 Year Strategic Partnership  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Characteristics, Characteristics, Values, and Metrics DOE Smart Grid Implementation Workshop June 19-20, 2008 Dr. Arshad Mansoor Vice President, Power Delivery & Utilization Electric Power Research Institute (EPRI) EPRI's Prism Analysis: Technology Pathway for CO 2 Reduction 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Smart Grid - Exchanging Information Seamlessly Across the Enterprise Information & Communication Enabled Power Infrastructure Distribution Consumer Transmission Substation Markets Acting on this Information Will: 3 © 2007 Electric Power Research Institute, Inc. All rights reserved. Smart Grid - Exchanging Information Seamlessly Across the Enterprise Information & Communication Enabled Power Infrastructure Distribution Consumer Transmission

57

EPRI Switching Safety and Reliability Reference Book: First Edition  

Science Conference Proceedings (OSTI)

Switching operations in electric power systems must be performed safely to avoid injury to the workers who perform the operations and to minimize the possibility of unscheduled outages or equipment damage due to erroneous switching.This report is the first edition of the EPRI Switching Safety and Reliability Reference Book. The book, known as the “Black Book,” joins the EPRI Color Book series of reference materials. Additional chapters of the EPRI Switching ...

2013-02-25T23:59:59.000Z

58

EPRI Underground Distribution Systems Reference Book (The Bronze Book)  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has developed the first edition of the EPRI Underground Distribution Systems Reference Book (Bronze Book). This reference, authored by leading industry expert authors, joins the EPRI series of Power Delivery technical references, commonly known by the color of their covers. The Bronze Book has been written to be a meaningful reference to utility engineers and personnel involved in the planning, design, manufacture, installation, operation, and maintenance of ...

2010-12-20T23:59:59.000Z

59

Application of Research Findings Case Study: EPRI Ergonomics Handbooks  

Science Conference Proceedings (OSTI)

In efforts to better translate its research, the Electric Power Research Institute (EPRI) Occupational Health and Safety (OHS) Program designed and administered an online survey for health and safety professionals who either participate in the OHS program or ordered particular EPRI ergonomic product deliverables. The research investigated the application and use of written and visual ergonomic resources developed over time by the EPRI OHS program. The ergonomic research reports were developed ...

2013-10-02T23:59:59.000Z

60

Framing Scenarios of Electricity Generation and Gas Use: EPRI Report Series on Gas Demands for Power Generation  

Science Conference Proceedings (OSTI)

This report provides a systematic appraisal of trends in electric generation and demands for gas for power generation. Gas-fired generation is the leading driver of forecasted growth in demand for natural gas in the United States, and natural gas is a leading fuel for planned new generating capacity. The report goes behind the numbers and forecasts to quantify key drivers and uncertainties.

1996-08-28T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Support for solar power and renewable electricity generation at the U.S. Environmental Protection Agency.  

E-Print Network (OSTI)

?? The United States Environmental Protection Agency (EPA) is poised to play an important role in supporting national plans for renewable electricity generation. As distributed… (more)

Krausz, Brian

2009-01-01T23:59:59.000Z

62

Technical Comments on the Environmental Protection Agency's (EPA's) National Pollutant Discharge Elimination System — Proposed Regulations to Establish Requirements for Cooling Water Intake Structures at Existing Facilities  

Science Conference Proceedings (OSTI)

This report presents the Electric Power Research Institute’s (EPRI’s) technical comments on the U.S. Environmental Protection Agency’s (EPA’s) June 11, 2012 Notice of Data Availability (NODA) Related to Impingement Mortality Control Requirements and its June 12, 2012 NODA Related to EPA’s Stated Preference Survey. These NODAs provide additional information to support EPA’s effort to develop a final Rule that implements the requirements of the Clean Water ...

2012-08-30T23:59:59.000Z

63

Microsoft Word - DOE EPRI MOU.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum of Understanding on Electric Utility Energy Efficiency, Memorandum of Understanding on Electric Utility Energy Efficiency, Demand Response, and the Smart Grid Between The United States Department of Energy And The Electric Power Research Institute, Inc. By this non-binding Memorandum of Understanding ("MOU"), the U.S. Department of Energy ("DOE") and the Electric Power Research Institute, Inc. ("EPRI") are furthering their long-term relationship by intending to work cooperatively to improve the efficient and effective use of energy and to encourage the widespread adoption of electric energy demand response programs. EPRI has launched an Energy Efficiency Initiative ("Initiative"). The Initiative is intended to elicit support from 30 to 50 electric utilities to enable expansion of programs, activities, and

64

How the EPRI Geomagnetic Disturbance (GMD) Research Fits Together  

Science Conference Proceedings (OSTI)

In collaboration with the North American Electric Reliability Corporation (NERC), the utility industry, and other stakeholders, the Electric Power Research Institute (EPRI) is building on two decades of research in the geomagnetic disturbances (GMD) area to develop the knowledge and tools to understand, predict, and mitigate the impact of GMDs on power systems. The three-year, comprehensive, multi-deliverable project that EPRI has recently launched will help the electric utility industry understand, ...

2012-09-18T23:59:59.000Z

65

EPRI HVDC Reference Book  

Science Conference Proceedings (OSTI)

This report is actually Chapter 17 of the EPRI HVDC Reference Book and describes a variety of simulation tools for high-voltage direct current (HVDC) systems. Modeling and simulation of HVDC systems is essential in the planning, engineering, designing, and operating stages of an HVDC system.

2008-04-15T23:59:59.000Z

66

EPRI PQ Signature Journal  

Science Conference Proceedings (OSTI)

Signature Journal is an annual newsletter product of the EPRI PQ Knowledge program (PS1D). This issue includes the following articles: Implementing Permanent Site Monitors for Power Quality Open-Delta and Open-Wye Utility Supplies to Adjustable-Speed Drives and Inverter-Based Technologies IEEE P1668: A New Voltage-Sag Characterization and Testing Standard

2009-08-24T23:59:59.000Z

67

Proceedings: 2003 EPRI International Low Level Waste Conference  

SciTech Connect

Nuclear utilities are continually evaluating methods to improve operations and minimize cost. EPRI's Twelfth Annual International Low Level Waste (LLW) Conference--coupled with the 24th Annual ASME/EPRI Radwaste Workshop--offered valuable insights into this effort by presenting papers covering new or improved technology developed worldwide for LLW management, processing, shipment, disposal, and regulation. EPRI accomplished the conference planning in collaboration with the International Atomic Energy Agency (IAEA). In addition to the United States, international representatives from the IAEA, Korea, Hungary, Canada, the United Kingdom, Japan, and Germany presented papers.

None

2004-04-01T23:59:59.000Z

68

EPRI Perspective on TUV Evaluation of KKM Core Shroud Repair  

Science Conference Proceedings (OSTI)

This report provides the Electric Power Research Institute (EPRI) perspective for why reliance on tie rods alone is an acceptable approach to managing stress corrosion cracking (SCC) of boiling water reactor (BWR) core shroud horizontal welds.

2009-04-29T23:59:59.000Z

69

Plug-In Hybrid Electric Vehicles - Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

EPRI and Argonne Assess Commercial Viability of Plug-In Hybrid Electric Vehicles The Electric Power Research Institute (EPRI) and Argonne National Laboratory are engaged in a...

70

EPRI Intelligent Universal Transformer  

Science Conference Proceedings (OSTI)

The vision of the EPRI ADA Program (Program 124) is to create the technology basis for the distribution system of the future by transforming traditional single-function distribution systems into multifunctional power and information exchange systems with increased reliability, improved performance (lower system losses), better economics, better power quality, and more customer service options. Achieving this vision will require capturing the benefits of new capabilities in power electronics, information ...

2006-12-18T23:59:59.000Z

71

Application of Electrotechnologies - EPRI's Program  

E-Print Network (OSTI)

The past year was one of significant progress in the Industrial Electrification Program. The Electrification Studies (i.e., process profiles) have been essentially completed. Work associated with developing these process profiles provided the background for the initial list of candidate process technologies which was subsequently used as the starting point for discussions with utility/industry at the Process Application Meetings (PAMs). Through these PAMs, EPRI was able to not only obtain a consensus of industrial opinion on specific technologies, but, was also able to identify commonalities that exist vis-a-vis novel electrical process technologies. These meetings also established the basis for a continuing dialogue with the utilities and their industrial customers.

Harry, I. L.

1983-01-01T23:59:59.000Z

72

Proceedings: 1986 EPRI cogeneration symposium  

SciTech Connect

On October 14-15, 1986, EPRI sponsored a Symposium on cogeneration to examine the major issues of current interest to utilities. The Symposium, held in Washington, DC, provided a forum for the review and exchange of information on the recent cogeneration experiences of utilities. Specific topics discussed were federal cogeneration regulations and their impacts on utilities, cogeneration trends and prospects, utility leadership in cogeneration ventures, strategic utility planning relative to cogeneration, small cogeneration: implications for utilities; and electric alternatives to cogeneration. Some of the critical issues relative to cogeneration from the utility perspective were explored in case studies, discussions and question/answer sessions. This report contains the 24 papers presented and discussed at the Symposium. They are processed separately for the data base.

Limaye, D.R.

1987-06-01T23:59:59.000Z

73

Environmental Impacts of New Generation in California: CEC-EPRI Workshop  

Science Conference Proceedings (OSTI)

A central issue facing the California Energy Commission (CEC) and other State agencies is how to provide an adequate supply of electric power to the citizens of California at a cost low enough to encourage economic growth and enhances human welfare and in a way that preserves the quality of the environment. To assist in addressing this issue, a Workshop on the Environmental Impacts of New Generation in California was conducted by the CEC and EPRI at the Hyatt Islandia Hotel, San Diego, California on Octo...

2000-12-06T23:59:59.000Z

74

Comparing the Benefits and Impacts of Hybrid Electric Vehicle Options  

Science Conference Proceedings (OSTI)

Download report 1000349 for FREE. This project continues the Hybrid Electric Vehicle Working Group (WG) study, in which EPRI has brought together representatives from the utility and automotive industries, the U.S. Department of Energy (DOE), other regulatory agencies, and university research organizations. The first study, "Assessment of Current Knowledge of Hybrid Vehicle Characteristics and Impacts" (EPRI report TR-113201), defined some of the ground rules for studying HEV technology. This stu...

2001-07-19T23:59:59.000Z

75

EPRI Biomass Interest Group Results  

Science Conference Proceedings (OSTI)

EPRI8217s Biomass Interest Group (BIG) provides topical reviews of major areas of interest in the field of biomass-to-power. Part of that review consists of periodic meetings to review existing EPRI BIG projects, discuss topics of interest or concern, hear from industry experts, and visit sites that highlight significant technical developments. In 2006, the EPRI BIG had three meetings. The first meeting was Thursday, April 6 in Golden, Colorado. The group reviewed ongoing projects and then toured the DO...

2006-12-07T23:59:59.000Z

76

EPRI Transformer Task Force Proceedings  

Science Conference Proceedings (OSTI)

The EPRI Transformer Task Force held a meeting on December 4, 2007, in San Antonio, Texas. This technical update contains the proceedings of the meeting.

2008-02-12T23:59:59.000Z

77

EPRI Transformer Task Force Proceedings  

Science Conference Proceedings (OSTI)

This report contains the proceedings from the EPRI Transformers Task Force, which was held in Montreal on October 26 and 27, 2006.

2006-12-12T23:59:59.000Z

78

EPRI BWR BRAC Summary  

Science Conference Proceedings (OSTI)

This report provides a summary of BRAC point average dose rates for the forty-six BWRs (thirty-five U.S., two Mexican, five European, and four Asian) currently participating in the EPRI BWR Chemistry Monitoring and Assessment project. The BRAC value is normally the average of the reactor recirculation suction and discharge contact dose rates measured with a shielded directional probe in the vertical piping sections. The results are categorized by chemistry regime, drains path, and, for NMCA plants, by BW...

2009-08-31T23:59:59.000Z

79

Proceedings: 2010 EPRI Groundwater Protection Workshop  

Science Conference Proceedings (OSTI)

The 2010 Electric Power Research Institute (EPRI) Groundwater Protection Workshop (in collaboration with the Nuclear Energy Institute [NEI]) was held in San Jose, California, on June 30-July 1, 2010. The workshop focused on nuclear plant leak prevention, groundwater monitoring and remediation techniques, and industry experience. This information will assist nuclear plant operators in the development and implementation of technically sound site groundwater protection programs (GPPs). This proceedings docu...

2011-06-09T23:59:59.000Z

80

Program on Technology Innovation: EPRI Biotechnology Workshop  

Science Conference Proceedings (OSTI)

This report contains the planning efforts and the proceedings of the EPRI Biotechnology Workshop held October 1011, 2006, in Palo Alto, California. The workshop provided a forum for the discussion of ongoing biotechnology research that might offer future benefits to the electric utility industry and its stakeholders. The workshop was organized into sessions discussing six biotechnology applications: waste remediation (phyto- and bioremediation), biomass, industrial process enhancement with enzymes, biohy...

2007-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Proceedings: 2011 EPRI Groundwater Protection Workshop  

Science Conference Proceedings (OSTI)

The 2011 Electric Power Research Institute (EPRI) Groundwater Protection Workshop (in collaboration with the Nuclear Energy Institute [NEI]) was held in Oakbridge (Chicago), Illinois, on June 27–29, 2011. The workshop focused on nuclear plant leak prevention, groundwater monitoring and remediation techniques, and industry experience. This information will assist nuclear plant operators in the development and implementation of technically sound site groundwater protection programs (GPPs). This proceedings...

2012-06-07T23:59:59.000Z

82

EPRI Materials Degradation Matrix, Revision 3  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Materials Degradation Matrix (MDM) identifies knowledge gaps associated with degradation phenomena that may detrimentally affect reactor operation, reactor safety, or regulatory climate. Where gaps are identified, the MDM assesses the status of research and development (R&D) needed to resolve the knowledge gap. In addition to a general update to address new operating experience and research results, specific objectives for this revision of the MDM ...

2013-05-30T23:59:59.000Z

83

Proceedings: 2010 EPRI International Low Level Waste Conference  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations, minimize costs, and find alternatives for disposal of Nuclear Regulatory Commission (NRC) Class A, B, and C waste. The Electric Power Research Institutes (EPRIs) 19th annual International Low Level Waste (LLW) Conferencecoupled with the 33rd annual American Society of Mechanical Engineers (ASME)/EPRI Radwaste Workshopoffered valuable insights into this effort by presenting papers covering new or improved technology developed worl...

2011-06-07T23:59:59.000Z

84

EPRI Switching Safety and Reliability Reference Book: Second Edition  

Science Conference Proceedings (OSTI)

Switching operations in electric power systems must be performed safely to avoid injury to workers who perform the operations, and to minimize the possibility of unscheduled outages or equipment damage due to erroneous switching.This report is the second edition of the EPRI Switching Safety and Reliability Reference Book.  The book, known as the “Black Book,” joins the EPRI Color Book series of valuable reference ...

2013-12-18T23:59:59.000Z

85

Proceedings: 9th EPRI International Decommissioning and Radioactive Waste Workshop  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) held the 9th EPRI International Decommissioning and Radioactive Waste Workshop in collaboration with Enresa on November 2-4, 2010 in Madrid, Spain. A parallel session with EU CARBOWASTE focused on technologies and methodologies for management of graphite wastes. The Workshop featured a visit to the Jose Cabrera Nuclear Power Plant, which is presently undergoing decommissioning. This proceedings document contains the abstracts and presentation slides from the p...

2011-09-14T23:59:59.000Z

86

EPRI/NRC-RES Fire Human Reliability Analysis Guidelines  

Science Conference Proceedings (OSTI)

In 2001, the Electric Power Research Institute (EPRI) and the U.S. Nuclear Regulatory Commission's Office of Nuclear Regulatory Research (NRC-RES), operating under a Memorandum of Understanding (MOU), collaborated to improve the state-of-the-art in fire risk assessment to support the new risk-informed environment in fire protection. This project produced a consensus documentNUREG/CR-6850 (EPRI report 1011989), Fire PRA Methodology for Nuclear Power Facilitieswhich addresses fire risk during operations at...

2012-07-24T23:59:59.000Z

87

Microsoft Word - 3 6 08 EPRI MOU.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR IMMEDIATE RELEASE FOR IMMEDIATE RELEASE Julie Ruggiero, (202) 586-4940 Thursday, March 6, 2008 Energy Department - Electric Power Research Institute Cooperation to Increase Energy Efficiency WASHINGTON, DC - The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI) strengthened cooperation for research, development and deployment of energy technologies aimed at promoting increased energy efficiency. DOE and EPRI yesterday signed a Memorandum of Understanding (MOU) establishing a framework for close coordination to advance the common goal of satisfying the nation's growing electricity needs by improving energy efficiency and promoting the widespread adoption of electric energy demand response programs in an effort to curtail energy use

88

EPRI Alpha Monitoring and Control Guidelines for Operating Nuclear Power Stations, Revision 2  

Science Conference Proceedings (OSTI)

In 2006, the Electric Power Research Institute (EPRI) first published the EPRI Alpha Monitoring Guidelines for Operating Nuclear Stations (EPRI report 1013509), to provide standardized guidance for monitoring alpha contamination. Minor revisions were made to the guidelines, which were re-issued in 2009 (1019500). Most US and some international utilities have implemented the guidelines, and several areas of improvement were identified to enhance information to support the monitoring and ...

2013-08-29T23:59:59.000Z

89

Proceedings: 2012 EPRI International Low Level Waste Conference and Exhibit Show  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations, minimize costs, and find alternatives for disposal of Nuclear Regulatory Commission (NRC) Class A, B, and C waste. The Electric Power Research Institute’s (EPRI’s) 21st annual International Low Level Waste (LLW) Conference—coupled with the 35th annual American Society of Mechanical Engineers (ASME)/EPRI Radwaste Workshop—offered valuable insights into this effort by presenting papers covering new or ...

2013-05-31T23:59:59.000Z

90

EPRI-USDOE COOPERATIVE AGREEMENT: COFIRING BIOMASS WITH COAL  

DOE Green Energy (OSTI)

The entire Electric Power Research Institute (EPRI) cofiring program has been in existence of some 9 years. This report presents a summary of the major elements of that program, focusing upon the following questions: (1) In pursuit of increased use of renewable energy in the US economy, why was electricity generation considered the most promising target, and why was cofiring pursued as the most effective near-term technology to use in broadening the use of biomass within the electricity generating arena? (2) What were the unique accomplishments of EPRI before the development of the Cooperative Agreement, which made developing the partnership with EPRI a highly cost-effective approach for USDOE? (3) What were the key accomplishments of the Cooperative Agreement in the development and execution of test and demonstration programs-accomplishments which significantly furthered the process of commercializing cofiring?

David A. Tillman

2001-09-01T23:59:59.000Z

91

Residential HVAC Data, Assumptions and Methodology for End-Use Forecasting with EPRI-REEPS 2.1  

E-Print Network (OSTI)

Eighth Electric Utility Forecasting Symposium in Baltimore,Development of a Residential Forecasting Database. Lawrenceand Methodology for End-Use Forecasting with EPRI-REEPS 2.1.

Johnson, F.X.

2010-01-01T23:59:59.000Z

92

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water Reactor Sustainability (LWRS) Program and EPRI's Long-Term Operations (LTO) Program. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a Memorandum of Understanding in late 2010 to "establish guiding principles under which research activities (between LWRS and LTO) could be

93

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water Reactor Sustainability (LWRS) Program and EPRI's Long-Term Operations (LTO) Program. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a Memorandum of Understanding in late 2010 to "establish guiding principles under which research activities (between LWRS and LTO) could be

94

EPRI Zed-Meter® Construction Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) developed the Zed-Meter to effectively evaluate transmission line structure grounding. The Zed-Meter has a number of advantages, including faster implementation, provision of an indication of impedance rather than resistance, and shield wires that do not need to be disconnected. The Zed-Meter is constructed from a number of off-the-shelf components together with software. This report outlines how a Zed-Meter can be constructed by a utility and how to install t...

2011-12-22T23:59:59.000Z

95

Kotzebue Electric Association Wind Power Project First-Year Operating Experience: 1999-2000: U.S. Department of Energy - EPRI Wind T urbine Verification Program  

Science Conference Proceedings (OSTI)

Although much of western Alaska has abundant wind resources, wind energy technology has not been widely deployed in the state, and utilities rely primarily on diesel fuel for energy generation. Kotzebue Electric Association is pioneering the application of wind energy technology in combination with the existing diesel generation in the remote communities in Northwest Alaska. This report describes the first-year operating experience at the 0.66-MW Kotzebue Electric Association (KEA) wind power project nea...

2000-12-13T23:59:59.000Z

96

EPRI Power Transformer Guidebook Development: The Copper Book  

Science Conference Proceedings (OSTI)

Utilities are losing many of their subject matter experts due to retirement and downsizing. This is particularly true in the case of power transformers, so there is now a critical need for a comprehensive transformer reference book geared toward utility engineers. In 2007, the Electric Power Research Institute (EPRI) published the technical update report Transformer Guidebook Design (1013799). That report ...

2012-12-13T23:59:59.000Z

97

Proceedings: EPRI/ESEERCO Workshop on Power Plant Optimization  

Science Conference Proceedings (OSTI)

The growing impetus to reduce costs of NOx compliance and electricity production has accelerated deployment of power plant optimization software in the utility industry. The EPRI/ESEERCO Workshop on Power Plant Optimization provided a forum for utilities to assess available power plant optimization software and review the application experience to date.

1997-08-21T23:59:59.000Z

98

Enhancements to ANNSTLF, EPRI's Short Term Load Forecaster  

Science Conference Proceedings (OSTI)

Reliable hourly load forecasts are important to electric utilities, power marketers, energy service providers, and independent system operators. To meet this need, EPRI's Artificial Neural Net Short Term Load Forecaster (ANNSTLF), which is already implemented at more than thirty-five utilities, was recently enhanced for greater accuracy and user friendliness.

1997-12-08T23:59:59.000Z

99

EPRI (2004, 2006) Ground-Motion Model Review Project  

Science Conference Proceedings (OSTI)

This project plan describes the Electric Power Research Institute (EPRI) (2004, 2006) Ground-Motion Model (GMM) Review Project, which will provide industry with information necessary to respond to the Nuclear Regulatory Commission Request for Information to Title 10 of the Code of Federal Regulations 50.54(f), Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012. The purpose of this study is to determine whether the EPRI (2004, 2006)...

2012-06-14T23:59:59.000Z

100

Kotzebue Electric Association Wind Power Project Third-Year Operating Experience: 2001-2002: U.S. Department of Energy - EPRI Wind T urbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the third-year operating experience and expansion of the 0.76-MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2002-12-13T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Kotzebue Electric Association Wind Power Project Second-Year Operating Experience: 2000-2001: U.S. Department of Energy-EPRI Wind Tu rbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the second-year operating experience at the 0.66-MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. Lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2001-11-30T23:59:59.000Z

102

Kotzebue Electric Association Wind Power Project Fourth-Year Operating Experience: 2002-2003: U.S. Department of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the fourth-year operating experience and expansion of the 0.76 MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2003-12-15T23:59:59.000Z

103

Advanced Coal Power Systems with CO2 Capture: EPRI's CoalFleet for Tomorrow® Vision—2011 Upd ate  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has examined current and potential options for reducing greenhouse gas (GHG) emissions from the electric sector. EPRIs analysis shows that a significant contribution from advanced coal power systems with carbon capture and storage (CCS) will likely be required to achieve economical GHG reductions; however, CCS technology has not yet been deployed at commercial scale.

2011-08-30T23:59:59.000Z

104

2005 EPRI PowerPoint Template  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solid-State Fault Current Limiters (SSFCL) Solid-State Fault Current Limiters (SSFCL) Ashok Sundaram Senior Project Manager (650) 855-2304 asundara@epri.com Mahesh Gandhi, PE General Manager (484) 913-1520 mahesh_gandhi@siliconpower.com Sept. 30, 2008 Annual DOE Peer Review Meeting Washington DC Funded by the Power Electronics Program of the U.S. Department Of Energy (DOE/PE) through Oak Ridge National Laboratories 2 © 2008 Electric Power Research Institute, Inc. All rights reserved. Fault Current Management * Growth in the generation of electrical energy, increased penetration of distributed resources and increased interconnection of the networks leads to higher fault currents * The growth in capacity requires replacing existing circuit breakers with higher fault current ratings. Major cost and down time.

105

EPRI Live Working Reference Book, Third Edition  

Science Conference Proceedings (OSTI)

This report is a fully revised, updated, and expanded edition of the EPRI Live Working Reference Book, Second Edition (1024479), published by EPRI in 2011. The EPRI Live Working Reference Book, Third Edition provides the utility industry with a single, comprehensive, updated guidebook on live working standards, tools, and procedures. Results and ...

2012-12-31T23:59:59.000Z

106

EPRI Live Working Reference Book, Ed. 4  

Science Conference Proceedings (OSTI)

This report is a fully revised, updated, and expanded edition of the EPRI Live Working Reference Book, Third Edition (1024142), published by EPRI in 2012. The EPRI Live Working Reference Book, Fourth Edition (3002000891) provides the utility industry with a single, comprehensive, updated guidebook on live working standards, tools, and procedures.BackgroundDeregulation demands higher levels of ...

2013-12-27T23:59:59.000Z

107

Fuel Switching on a Dime -- Boiler Capabilities of Electric Utilities and Industrial Companies: EPRI Report Series on Gas Demands for Power Generation  

Science Conference Proceedings (OSTI)

Electric utilities play an unusual and important role in the natural gas market because so much of their ongoing gas demand is price sensitive. This report, which focuses on the pattern of this demand, tracks how switching between gas and alternative fuels by major users affects the overall market. Events over the past four years and new plant-specific data have changed our understanding of this phenomenon.

1994-01-01T23:59:59.000Z

108

Integration of EPRI Products With Enterprise Systems: A Case Study for Nuclear Asset Management  

Science Conference Proceedings (OSTI)

Integrating business applications across the electric utility enterprise has become a high priority in the electric utility industry to reduce information technology costs and realize a range of business benefits. This report documents the first phase of an EPRI program to demonstrate the feasibility and benefits of such integration, specifically for EPRI products, using risk-informed asset management (RIAM) as an initial case study.

2004-12-08T23:59:59.000Z

109

EPRI Power Switching Safety and Reliability Project: Summaries of Published Reports and Listing of Conference Presentations 1996–2012  

Science Conference Proceedings (OSTI)

This report presents brief descriptions of the publications of the Electric Power Research Institute (EPRI) Switching Safety and Reliability (SS&R) Project and of the presentations at the annual EPRI SS&R Conferences from 1996 (the year of the project’s inception) through 2012.The purpose of the SS&R Project, started in 1996, was originally to analyze switching errors and related incidents and to determine effective ways of limiting their occurrence. At the 1997 EPRI ...

2013-07-25T23:59:59.000Z

110

EPRI Power System Dynamics Tutorial  

Science Conference Proceedings (OSTI)

Operation of today's increasingly complex power systems requires comprehensive training of system operators and operations engineers. By increasing their awareness and understanding of dynamic phenomena, the EPRI Power System Dynamics Tutorial can improve an operator's ability to take effective actioneither preventive or corrective. This latest version of the tutorial represents an update of key topics to reflect industry restructuring under the vision of the Federal Energy Regulatory Commission (FERC) a...

2009-07-27T23:59:59.000Z

111

Non-road Electric Transportation Industry Advisory Council: July 28-29, 2009 Meeting Proceedings  

Science Conference Proceedings (OSTI)

EPRI's Non-road Electric Transportation Industry Advisory Council brings together industry's stakeholders to promote non-road electrification. The Council's July 28-29, 2009 meeting included stakeholders from utilities, public agencies and manufacturers. The presentations dealt with batteries, lift trucks, utility vehicles, agriculture vehicles, and ground support equipment.

2009-10-01T23:59:59.000Z

112

EPRI Cogeneration Models -- DEUS and COPE  

E-Print Network (OSTI)

In the Fall of 1978, the Electric Power Research Institute (EPRI) initiated a program for the design and evaluation of alternate cogeneration systems. The primary objective of the study is to analyze the overall system value of cogeneration. A portion of the study involved the development of a simulation model for evaluation of cogeneration systems on a site specific basis. Dual Energy Use Systems (DEUS) model contains an extensive data base with which to cost and size many different cogeneration systems and compare them with the no-cogeneration system for the same process. A financial and institutional model has been developed to follow the after tax cash flows from the attractive cogeneration configurations identified in DEUS. The financial model, Cogeneration Options Evaluation (COPE), is designed to consider the financial and regulatory implications for the utility, the industry and where relevant, third parties, for all practically feasible combinations of ownership.

Mauro, R.; Hu, S. D.

1983-01-01T23:59:59.000Z

113

EPRI Integrated Dose Reduction Program Pilot Study  

Science Conference Proceedings (OSTI)

The Integrated Dose Reduction (IDR) project is an integral part of EPRI's support to nuclear plant radiation protection programs. The broad objective of the IDR program is to review existing and recent industry developments and provide utilities with an integrated plan for EPRI's assistance based on a plant's specific needs. This document describes a pilot test of this product at a host site, and identifies areas where EPRI's RP assessments and technical assistance can support key plant programs.

2003-11-21T23:59:59.000Z

114

EPRI Increased Transmission Capacity Workshop Proceedings  

Science Conference Proceedings (OSTI)

This report documents the proceedings of EPRI's Increased Overhead Transmission Capacity Workshop. The workshop was held on September 20, 2011 at the offices of the American Transmission Company in Waukesha, Wisconsin. Participants included members of the EPRI Increased Overhead Transmission Capacity Task Force. The workshop was a joint effort of two EPRI research projects: (1) Increased Power Flow Guidebook and Ratings for Overhead Lines, and (2) Impact of High Temperature Operation on Conductor Systems...

2011-11-30T23:59:59.000Z

115

Research Results and Further Opportunities Resulting from Collaboration with Electricity Research Centre, University College Dublin  

Science Conference Proceedings (OSTI)

In 2010, the Electric Power Research Institute (EPRI) research program on Integration of Bulk System Variable Generation (Program 173) funded the Electricity Research Centre (ERC). The ERC is an industry/university research collaboration, funded by 14 industry entities as well as other government funding agencies, based in electrical engineering at University College Dublin with an energy economics branch at Trinity College Dublin. The work performed focuses primarily on renewable generation integration;...

2011-08-30T23:59:59.000Z

116

EPRI Power Switching Safety and Reliability Project  

Science Conference Proceedings (OSTI)

This report presents brief descriptions of the publications of the EPRI Switching Safety and Reliability (SS&R) Project and of the presentations at the annual EPRI SS&R Conferences from 1996 (the year of the projects inception) until 2010. The SS&R Project was initiated in 1996. Its purpose was to analyze switching errors and related incidents and to determine effective ways of limiting their occurrence. At the 1997 EPRI SS&R Conference, it became clear to EPRI and to the participants that there was a ne...

2011-04-12T23:59:59.000Z

117

EPRI EMF Exposure Database: EMDEX Occupational Study Data Set  

Science Conference Proceedings (OSTI)

Researchers from the EMDEX Occupational Study (WO2966-01) provided data from this study for inclusion in the EPRI EMF Exposure Database. This data set contains fourteen data products related to measurements of electric and magnetic field personal exposure: binary and ASCII time-series files of individual measurements, summaries of occupied environment by partition (continuous period in environment), by day and by entire measurement session, summaries of occupied environment for work status (work/non-work...

1996-10-31T23:59:59.000Z

118

EPRI Power Transformer Guidebook Development: The Copper Book  

Science Conference Proceedings (OSTI)

Utilities are losing many of their subject matter experts due to retirement and downsizing. This is particularly true in the case of power transformers, so there is now a critical need for a comprehensive transformer reference book geared toward utility engineers. In 2007, the Electric Power Research Institute (EPRI) published the technical update report Transformer Guidebook Design (1013799). That report described the results of the initial project to develop the Copper Book, a ...

2013-12-19T23:59:59.000Z

119

EPRI Energy Efficiency CO2 Intensity Calculator, 2010  

Science Conference Proceedings (OSTI)

This spreadsheet calculator will allow members to quantify the impact of their energy efficiency savings on carbon-dioxide emissions, specific to their region and the end-uses for which the savings emanate. This user-friendly COintensity calculator is a Microsoft Excel application to help utility staff calculate the impact of their actual or planned energy efficiency programs on emissions of CO8322. The calculator will access a database of load dispatch simulation runs of the EPRI National Electric Syste...

2010-12-01T23:59:59.000Z

120

Scoping Evaluation to Revise the EPRI Standard Radiation Monitoring Programs  

Science Conference Proceedings (OSTI)

The PWR Standard Radiation Monitoring Program (SRMP) and BWR Radiation Level Assessment and Control (BRAC) program are the cornerstone of the Electric Power Research Institute (EPRI) Radiation Management program. These programs provide an essential tie between radiation field generation and chemical and operational changes, but there is some evidence that the trends in these reactor coolant piping dose rates do not correspond to radiation field trends elsewhere in the plant. In an effort to improve corre...

2012-03-19T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Fuel Reliability Program: EPRI PCI Guidelines Support Analyses  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) issued a series of fuel reliability guideline reports in support of the Institute of Nuclear Power Operations (INPOs) Zero by 2010 initiative. For the development of Fuel Reliability Guidelines: Pellet-Cladding Interaction (1015453), the fuel vendorsAREVA, GNF, and Westinghouseprovided considerable proprietary information. This report serves as a reference that supplements report 1015453 and provides details on AREVA PWR and BWR fuel.

2009-05-19T23:59:59.000Z

122

EPRI-SQUG Damage-Indicating Parameter Information  

Science Conference Proceedings (OSTI)

This report provides information assembled for the purpose of developing damage-indicating parameters (DIPs) for power plant equipment. An existing Electric Power Research Institute (EPRI) seismic experience database is used to develop candidate DIP values associated with two database sites subjected to earthquake events. The two sites are described, the candidate DIPs are derived from the recorded site motions, and the equipment items at these sites are categorized according to performance during an ear...

2011-09-13T23:59:59.000Z

123

Fuel Reliability Program: EPRI PCI Guidelines Support Analyses  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) issued a series of fuel reliability guideline reports in support of the Institute of Nuclear Power Operations (INPOs) Zero by 2010 initiative. For the development of Fuel Reliability Guidelines: Pellet-Cladding Interaction (1015453), the fuel vendorsAREVA, GNF, and Westinghouseprovided considerable proprietary information. This report serves as a reference that supplements report 1015453 and provides details on Westinghouse PWR and BWR fuel.

2009-05-19T23:59:59.000Z

124

EPRI Central Plant Equipment Manufacturers Roundtable, Meeting Summary, October 26-27, 1999, Houston, Texas  

Science Conference Proceedings (OSTI)

EPRI and Reliant Energy co-sponsored the Central Plant Equipment Manufacturers Roundtable on October 26-27, 1999. The meeting gave EPRI members, commercial building owners, and central plant equipment manufacturers an opportunity to enhance their relationships as the electric industry faces deregulation. Representatives from major building owner and facility manager organizations attended the meeting, as did representatives from major equipment suppliers. The roundtable forum provided for extensive and l...

1999-12-13T23:59:59.000Z

125

EPRI Transformer Guidebook Development: The Copper Book, Chapter 8 Transformer Maintenance  

Science Conference Proceedings (OSTI)

This Report is Chapter 8 of Kit 1021892: EPRI Transformer Guidebook Development: The Copper Book. Utilities are losing many of their subject matter experts due to retirement and downsizing. This is particularly true in the case of power transformers, so there is now a critical need for a comprehensive transformer reference book geared toward utility engineers. In 2007, the Electric Power Research Institute (EPRI) published the technical update report Transformer Guidebook Design (1013799). That report de...

2011-12-22T23:59:59.000Z

126

Proceedings: 2011 EPRI International Low Level Waste Conference and Exhibit Show  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations, minimize costs, and find alternatives for disposal of Nuclear Regulatory Commission (NRC) Class A, B, and C waste. The Electric Power Research Institute's (EPRI's) 20th Annual International Low Level Waste (LLW) Conferencecoupled with the 34th Annual American Society of Mechanical Engineers (ASME)/EPRI Radwaste Workshopoffered valuable insights into this effort by presenting papers covering new or improved technology developed wo...

2012-03-21T23:59:59.000Z

127

Proceedings: 8th EPRI International Decommissioning and Radioactive Waste Management Workshop  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) collaborated with E.On Kernkraft to hold the 8th EPRI International Decommissioning and Radwaste Management Workshop in Hamburg, Germany on October 6-8, 2009. A parallel session with EU CARBOWASTE focused on technologies and methodologies for management of graphite wastes. The Workshop featured a visit to the Stade nuclear power plant, which is presently undergoing decommissioning. This proceedings document contains the abstracts and presentation slides from t...

2011-01-31T23:59:59.000Z

128

Risk-Managed Technical Specifications (RMTS) Guidelines: Technical Update to EPRI Interim Development Report 1002965  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has assessed the role of probabilistic risk assessment (PRA) in the regulation of nuclear power plant technical specifications. This report presents nuclear utilities with one example of a technical framework and associated general guidance for implementation of risk-managed technical specifications (RMTS) as a partial replacement of existing conventional plant technical specifications. This report was prepared by EPRI and the Westinghouse Owners Group (WOG) f...

2004-12-11T23:59:59.000Z

129

Common Information Model (CIM) 2012 Update: EPRI Development, Testing Activity, and Plans  

Science Conference Proceedings (OSTI)

This report provides a synopsis of the Electric Power Research Institute’s (EPRI’s) plan for Common Information Model (CIM) support going forward. This report also includes the activity of the International Electrotechnical Commission (IEC) Technical Committee (TC) Working Groups 13 and 14 for the year 2012. Additionally, it incorporates the proceedings of the two CIM International User Group meetings in Windsor, England, and New Orleans, Louisiana, in 2012. Finally, executive summaries ...

2013-03-20T23:59:59.000Z

130

Program on Technology Innovation: EPRI State of Robotics—Assessment and Proposed Strategic Program  

Science Conference Proceedings (OSTI)

Robotics technology is widely used throughout many industries and dates back almost 60 years. Although the power industry uses some robotics, much potential remains untapped. This report explains the current level of engagement within the Electric Power Research Institute’s (EPRI’s) robotics technology projects, assesses the need for engagement by sector, identifies technical gaps, and proposes a model for the inception of a strategic program initiative for robotics ...

2013-09-16T23:59:59.000Z

131

Program 87: Proceedings of the EPRI International Creep-Fatigue Experts Workshop 5: ASTM ;EPRI Creep-Fatigue Interaction Symposium  

Science Conference Proceedings (OSTI)

The industrial need for extended service life of power generation plants calls for assessing the creep-fatigue performance of traditional boiler and turbine components. This is particularly important for structural integrity and safe operation of units designed for base load operation. The Electric Power Research Institute (EPRI) leads an international experts group, including key industry experts and researchers, for Experts Workshop on Creep-Fatigue Damage Interaction, which is held annually.

2011-09-30T23:59:59.000Z

132

2003 NEI/EPRI Decommissioning Forum  

Science Conference Proceedings (OSTI)

The NEI/EPRI Decommissioning Forum provides a comprehensive overview of the challenges facing the industry in the completion of the nuclear power plant life cycle. This report presents the proceedings of the NEI/EPRI 2003 Decommissioning Forum, which focused on license termination, material clearance values, funding, and final site release requirements.

2003-07-28T23:59:59.000Z

133

EPRI Feedwater Heater Technology Conference Proceedings  

Science Conference Proceedings (OSTI)

This report documents the proceedings of EPRI's 2013 Feedwater Heater Technology Conference.BackgroundFeedwater heaters and associated systems cause significant loss of availability and heat rate degradation in both nuclear and fossil-fired power plants. Improving design, materials, and operation and maintenance practices can correct most losses. EPRI, utility members, equipment manufacturers, and others have worked to improve system reliability, ...

2013-09-30T23:59:59.000Z

134

An Activity-Based Assessment of the Potential Impacts of Plug-In Hybrid Electric Vehicles on Energy and Emissions Using One-Day Travel Data  

E-Print Network (OSTI)

electric vehicle options for compact sedan and sport utility vehicles (EPRI, 2002) An 80% required safety

Recker, W. W.; Kang, J. E.

2010-01-01T23:59:59.000Z

135

Effect of Heat and Electricity Storage and Reliability on Microgrid Viability: A Study of Commercial Buildings in California and New York States  

E-Print Network (OSTI)

capitalcost.htm). EPRI-DOE Handbook of Energy Storage foret al. 1996, 2003, EPRI-DOE Handbook 2003, Goldstein, L. etet al. 2003, EPRI-DOE Handbook 2003 and at the Electricity

Stadler, Michael

2009-01-01T23:59:59.000Z

136

Development of the EPRI Magnetic Molecules Technology  

Science Conference Proceedings (OSTI)

This report describes the work to date on development of Magnetic Molecules, a new technology for the selective removal of radioactive and other contaminants from liquid wastes and process solutions at nuclear power plants. Following an initial proof of principle test demonstrating the viability of the concept, EPRI has filed a patent application. This report describes the work completed during the first half of the EPRI program to establish this technology.

2004-11-15T23:59:59.000Z

137

Proceedings: 1998 EPRI Chemical Decontamination Conference  

Science Conference Proceedings (OSTI)

In today's competitive environment, chemical decontamination technology has evolved to meet nuclear industry challenges to control costs and reduce outage times. EPRI's 1998 Chemical Decontamination Conference included 29 presentations which highlighted recent technology developments and field experience. Featured in the conference were the results of the first applications of the EPRI decontamination for decommissioning (DFD) process in the decommissioning of Big Rock Point and Maine Yankee plants.

1998-07-29T23:59:59.000Z

138

The EPRI DFDX Process--Final Report  

Science Conference Proceedings (OSTI)

This report describes the development of the EPRI DFDX (Decontamination For Decommissioning, electrochemical ion eXchange) process for the chemical decontamination of reactor coolant systems and components. EPRI has received a US patent, and constructed a plant, conforming to exacting nuclear industry standards, to demonstrate the process at a number of sites. The plant has completed successful tests at Studsvik in Sweden and Dounreay in Scotland, and is now in commercial operation in the United Kingdom....

2006-05-03T23:59:59.000Z

139

BWR Failed Fuel Degradation: An EPRI Perspective  

Science Conference Proceedings (OSTI)

In response to severe fuel degradation concerns within the nuclear fuel community, EPRI initiated a comprehensive program to investigate the phenomenon, propose operational guidelines for mitigating the effects of failed fuel rods during a reactor cycle, and develop a model to help predict the behavior of failed fuel rods. The understanding provided by EPRI's program, and others, has resulted in new fuel products expected to be more resistant to degradation. This report provides a convenient reference fo...

2000-11-30T23:59:59.000Z

140

EPRI (2004, 2006) Ground-Motion Model (GMM) Review Project  

Science Conference Proceedings (OSTI)

This report describes the Electric Power Research Institute (EPRI) (2004, 2006) Ground-Motion Model (GMM) Review Project, which developed an updated GMM for the Central and Eastern United States (CEUS) for use by licensees of nuclear generating plants to respond to the U.S. Nuclear Regulatory Commission’s (NRC’s) Request for Information to Title 10 of the Code of Federal Regulations 50.54(f), Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi ...

2013-06-13T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-NE Light Water Reactor Sustainability Program and EPRI DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program - Joint Research and Development Plan DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program - Joint Research and Development Plan Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation's

142

DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-NE Light Water Reactor Sustainability Program and EPRI DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program - Joint Research and Development Plan DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program - Joint Research and Development Plan Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation's

143

ESS 2012 Peer Review - DOE-EPRI Energy Storage Handbook in Collaboration with NRECA - Abbas Akhil, SNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EPRI Electricity DOE/EPRI Electricity Storage Handbook - in Collaboration with NRECA 28 September 2012 Abbas Akhil Dr. Imre Gyuk and the Department of Energy's Office of Electricity Delivery & Energy Reliability support is gratefully acknowledged. Electricity Storage Handbook  Objective:  Compile a "how-to" Handbook that presents the technology capabilities, costs, tools and process for implementing electricity storage projects in the US.  Approach:  Publish an open domain DOE Electricity Storage Handbook in partnership with EPRI  Collaboration with NRECA - leverage their knowledge base and reaches the large co-operative utility base  Handbook draws from and updates large body of work of prior work 2 Handbook Chapters  Introduction

144

EPRI/NRC-RES fire human reliability analysis guidelines.  

Science Conference Proceedings (OSTI)

During the 1990s, the Electric Power Research Institute (EPRI) developed methods for fire risk analysis to support its utility members in the preparation of responses to Generic Letter 88-20, Supplement 4, 'Individual Plant Examination - External Events' (IPEEE). This effort produced a Fire Risk Assessment methodology for operations at power that was used by the majority of U.S. nuclear power plants (NPPs) in support of the IPEEE program and several NPPs overseas. Although these methods were acceptable for accomplishing the objectives of the IPEEE, EPRI and the U.S. Nuclear Regulatory Commission (NRC) recognized that they required upgrades to support current requirements for risk-informed, performance-based (RI/PB) applications. In 2001, EPRI and the USNRC's Office of Nuclear Regulatory Research (RES) embarked on a cooperative project to improve the state-of-the-art in fire risk assessment to support a new risk-informed environment in fire protection. This project produced a consensus document, NUREG/CR-6850 (EPRI 1011989), entitled 'Fire PRA Methodology for Nuclear Power Facilities' which addressed fire risk for at power operations. NUREG/CR-6850 developed high level guidance on the process for identification and inclusion of human failure events (HFEs) into the fire PRA (FPRA), and a methodology for assigning quantitative screening values to these HFEs. It outlined the initial considerations of performance shaping factors (PSFs) and related fire effects that may need to be addressed in developing best-estimate human error probabilities (HEPs). However, NUREG/CR-6850 did not describe a methodology to develop best-estimate HEPs given the PSFs and the fire-related effects. In 2007, EPRI and RES embarked on another cooperative project to develop explicit guidance for estimating HEPs for human failure events under fire generated conditions, building upon existing human reliability analysis (HRA) methods. This document provides a methodology and guidance for conducting a fire HRA. This process includes identification and definition of post-fire human failure events, qualitative analysis, quantification, recovery, dependency, and uncertainty. This document provides three approaches to quantification: screening, scoping, and detailed HRA. Screening is based on the guidance in NUREG/CR-6850, with some additional guidance for scenarios with long time windows. Scoping is a new approach to quantification developed specifically to support the iterative nature of fire PRA quantification. Scoping is intended to provide less conservative HEPs than screening, but requires fewer resources than a detailed HRA analysis. For detailed HRA quantification, guidance has been developed on how to apply existing methods to assess post-fire fire HEPs.

Lewis, Stuart R. (Electric Power Research Institute, Charlotte, NC); Cooper, Susan E. (U.S. Nuclear Regulatory Commission, Rockville, MD); Najafi, Bijan (SAIC, Campbell, CA); Collins, Erin (SAIC, Campbell, CA); Hannaman, Bill (SAIC, Campbell, CA); Kohlhepp, Kaydee (Scientech, Tukwila, WA); Grobbelaar, Jan (Scientech, Tukwila, WA); Hill, Kendra (U.S. Nuclear Regulatory Commission, Rockville, MD); Hendrickson, Stacey M. Langfitt; Forester, John Alan; Julius, Jeff (Scientech, Tukwila, WA)

2010-03-01T23:59:59.000Z

145

The EPRI/DOE Utility Wind Turbine Performance Verification Program  

DOE Green Energy (OSTI)

In 1992, the Electric Power Research Institute (EPRI) and the US Department of Energy (DOE) initiated the Utility Wind Turbine Performance Verification Program (TVP). This paper provides an overview of the TVP, its purpose and goals, and the participating utility projects. Improved technology has significantly reduced the cost of energy from wind turbines since the early 1980s. In 1992, turbines were producing electricity for about $0.07--$0.09/kilowatt-hour (kWh) (at 7 m/s [16 mph sites]), compared with more than $0.30/kWh in 1980. Further technology improvements were expected to lower the cost of energy from wind turbines to $0.05/kWh. More than 17,000 wind turbines, totaling more than 1,500 MW capacity, were installed in the US, primarily in California and Hawaii. The better wind plants had availabilities above 95%, capacity factors exceeding 30%, and operation and maintenance costs of $0.01/kWh. However, despite improving technology, EPRI and DOE recognized that utility use of wind turbines was still largely limited to turbines installed in California and Hawaii during the 1980s. Wind resource assessments showed that other regions of the US, particularly the Midwest, had abundant wind resources. EPRI and DOE sought to provide a bridge from utility-grade turbine development programs under way to commercial purchases of the wind turbines. The TVP was developed to allow utilities to build and operate enough candidate turbines to gain statistically significant operating and maintenance data.

Calvert, S.; Goldman, P. [Department of Energy, Washington, DC (United States); DeMeo, E.; McGowin, C. [Electric Power Research Inst., Palo Alto, CA (United States); Smith, B.; Tromly, K. [National Renewable Energy Lab., Golden, CO (United States)

1997-01-01T23:59:59.000Z

146

Batteries for Plug-in Hybrid Electric Vehicles (PHEVs): Goals and the State of Technology circa 2008  

E-Print Network (OSTI)

rd International Electric Vehicle Symposium and Exposition (Electric and Hybrid Electric Vehicle Applications, Sandiaand Impacts of Hybrid Electric Vehicle Options EPRI, Palo

Axsen, Jonn; Burke, Andy; Kurani, Kenneth S

2008-01-01T23:59:59.000Z

147

Batteries for Plug-in Hybrid Electric Vehicles (PHEVs): Goals and the State of Technology circa 2008  

E-Print Network (OSTI)

vehicles was the Hybrid and Electric Vehicle Act of 1976.for Electric and Hybrid Electric Vehicle Applications,and Impacts of Hybrid Electric Vehicle Options EPRI, Palo

Axsen, Jonn; Burke, Andy; Kurani, Kenneth S

2008-01-01T23:59:59.000Z

148

Nuclear Maintenance Applications Center: Vertical Pump Maintenance Guide -- Update to EPRI Report 1003467  

Science Conference Proceedings (OSTI)

Results from several annual Electric Power Research Institute (EPRI) Nuclear Maintenance Applications Center (NMAC) maintenance issues surveys indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for information and assistance with pump and motor ...

2012-10-15T23:59:59.000Z

149

EPRI Occupational Health and Safety Annual Report 2004: Occupational Health and Safety Trends 1995-2003  

Science Conference Proceedings (OSTI)

This is the fifth annual report of illness and injury trends in the electric energy industry based on data collected as part of EPRI's Occupational Health and Safety Database (OHSD) program. The report summarizes injury/illness trends over the period 1995-2003 from fourteen participating companies.

2004-12-27T23:59:59.000Z

150

RD&D Cooperation for the Development of Fuel Cell, Hybrid and Electric Vehicles within the International Energy Agency: Preprint  

DOE Green Energy (OSTI)

Annex XIII on 'Fuel Cell Vehicles' of the Implementing Agreement Hybrid and Electric Vehicles of the International Energy Agency has been operating since 2006, complementing the ongoing activities on battery and hybrid electric vehicles within this group. This paper provides an overview of the Annex XIII final report for 2010, compiling an up-to-date, neutral, and comprehensive assessment of current trends in fuel cell vehicle technology and related policy. The technological description includes trends in system configuration as well as a review of the most relevant components including the fuel cell stack, batteries, and hydrogen storage. Results from fuel cell vehicle demonstration projects around the world and an overview of the successful implementation of fuel cells in specific transport niche markets will also be discussed. The final section of this report provides a detailed description of national research, development, and demonstration (RD&D) efforts worldwide.

Telias, G.; Day, K.; Dietrich, P.

2011-01-01T23:59:59.000Z

151

NREL: Wind Research - NREL and EPRI Actively Embrace Active Power Control  

NLE Websites -- All DOE Office Websites (Extended Search)

and EPRI Actively Embrace Active Power Control Systems for Wind Power and EPRI Actively Embrace Active Power Control Systems for Wind Power December 2, 2013 The Second Workshop on Active Power Control (APC) cohosted by the National Renewable Energy Laboratory (NREL) and the Electric Power Research Institute (EPRI) in Broomfield, Colorado, last May drew more than 60 industry experts from around the world to participate in a comprehensive discussion about the need for and impacts of active power controls from wind plants. Various forms of active power control can help stabilize the grid by enabling generating sources to increase or decrease power output to meet the constantly fluctuating needs of meeting the load demand and avoid events that can cause brownouts and power failures. The three forms of active power control discussed during the workshop were inertial control,

152

Electrical Effects of HVDC Transmission Lines--2012  

Science Conference Proceedings (OSTI)

Electrical effects may constrain the design of prospective high-voltage direct current (HVDC) lines, when either alone or sharing the same structures with high-voltage alternating current (HVAC) lines. In 2012, the Electric Power Research Institute (EPRI) research focused on electric field and ion density at ground level. The ultimate goal is to calculate with confidence these electrical effects. The work built on research previously performed, including pioneering research performed at EPRI’s ...

2012-12-12T23:59:59.000Z

153

Proceedings: 2005 EPRI/ISOE ALARA Symposium  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and minimize personnel exposure. The 2005 EPRI Radiation Protection Conference/ISOE (Information System of Occupational Exposure) International ALARA Symposium offered valuable insights into this effort by presenting papers covering new or improved ALARA technologies and experiences developed worldwide for personnel exposure management, radiation source term reduction, and regulation.

2006-10-04T23:59:59.000Z

154

Proceedings: 2002 ASME/EPRI Radwaste Workshop  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and reduce costs associated with radioactive waste management. The 25th Annual ASME/EPRI Workshop facilitates this effort by communicating technology and management improvements throughout the industry. This workshop, restricted to utility radwaste professionals, also serves to communicate practical in-plant improvements with the opportunity to discuss them in detail.

2002-11-01T23:59:59.000Z

155

Second EPRI International Decommissioning Workshop at Bristol  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an international EPRI workshop on decommissioning and radioactive waste management. The workshop focused on a wide range of decommissioning topics, including general approaches, technical developments, and project experiences. The information presented will assist individual utilities in their decommissioning projects, and has the potential to reduce decommissioning costs.

2004-08-06T23:59:59.000Z

156

Proceedings: 1995 ASME/EPRI Radwaste Workshop  

Science Conference Proceedings (OSTI)

Minimizing the generation and cost of processing low level radioactive waste is a top priority for nuclear power plants. The 17th annual ASME/EPRI Radwaste Workshop focused on the following key issues: wet and liquid waste processing, dry active waste, interim storage, packaging, downsizing, criteria for waste storage, mixed waste, and regulatory issues.

1995-10-20T23:59:59.000Z

157

Proceedings: 1994 ASME/EPRI Radwaste Workshop  

Science Conference Proceedings (OSTI)

Minimizing the generation and cost of processing low level radioactive waste is a strong priority for nuclear power plants. The 16th annual ASME/EPRI Radwaste Workshop focused on the following key issues: mixed waste, wet and liquid waste processing, dry active waste, interim storage, conditioning, criteria for waste storage, and regulatory issues.

1995-05-27T23:59:59.000Z

158

Proceedings: 1991 EPRI Gas Turbine Procurement Seminar  

Science Conference Proceedings (OSTI)

EPRI's 1991 workshop on gas turbine procurement will help equipment specifiers to develop more-effective procurement procedures for new gas turbine generating units.Properly drafted specifications and an informed purchase posture improve the quality of a procurement and can result in lower unit life-cycle cost.

1992-05-01T23:59:59.000Z

159

Proceedings: Tenth EPRI Substation Equipment Diagnostics Conference  

SciTech Connect

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The tenth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2002-06-01T23:59:59.000Z

160

EPRI Fault Current Management Guidebook, Fifth Edition  

Science Conference Proceedings (OSTI)

This document is an update of EPRI report 1020029, Fault Current Management Guidebook, Fourth Edition, on fault current effects and management in transmission and distribution systems. This guide is intended to be a snapshot of available references, information, and literature on the effects of high fault current on a number of power system components and various available and emerging fault-current-limiting technologies.

2011-12-19T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EPRI's Twelfth Heat Rate Improvement Conference Proceedings  

Science Conference Proceedings (OSTI)

The Twelfth Heat Rate Improvement Conference, sponsored by EPRI's Heat Rate and Cost Optimization Value Package, is the latest in a series of meetings designed to assist utilities in addressing problems with power plant performance and in identifying cost-effective solutions for achieving and maintaining heat rate improvement. The last conference was held in Baltimore in September 1998.

2001-01-22T23:59:59.000Z

162

Fifth EPRI International Conference on Maintenance Proceedings  

Science Conference Proceedings (OSTI)

The Fifth EPRI International Conference on Maintenance focused primarily on fossil and nuclear generating assets, but many topics will be applicable to other assets, as well. Equipment manufacturers, vendors, architect/engineers, and consultants will also find this conference prodedings to be informative and valuable.

2005-12-23T23:59:59.000Z

163

Proceedings: 2003 ASME/EPRI Radwaste Workshop  

SciTech Connect

Nuclear utilities are continually evaluating methods to improve operations and reduce costs associated with radioactive waste management. The 26th Annual ASME/EPRI Workshop facilitates this effort by communicating technology and management improvements throughout the industry. This workshop, restricted to utility radwaste professionals, also serves to communicate practical in-plant improvements with the opportunity to discuss them in detail.

None

2004-05-01T23:59:59.000Z

164

Proceedings: EPRI Second Phased Array Inspection Seminar  

SciTech Connect

The Second EPRI Phased Array Inspection Seminar focused on industrial applications of phased array technology that have been achieved to date or are planned for the near future. Presentations were made by developers of inspection techniques, inspection services vendors, and utility personnel who have performed inspections using arrays.

None

2001-11-01T23:59:59.000Z

165

Proceedings: EPRI Manufactured Gas Plants 2003 Forum  

SciTech Connect

The EPRI Manufactured Gas Plants 2003 Forum covered a range of topics related to remediation and management of former manufactured gas plant (MGP) sites, with emphasis on technological advances and current issues associated with site cleanup. In specific, the forum covered MGP coal-tar delineation, soil and groundwater remediation technologies, improvements in air monitoring, and ecological risk characterization/risk management tools.

None

2004-02-01T23:59:59.000Z

166

Proceedings: Tenth EPRI Substation Equipment Diagnostics Conference  

Science Conference Proceedings (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The tenth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

2002-06-27T23:59:59.000Z

167

EPRI Biomass Interest Group European Technology Review  

Science Conference Proceedings (OSTI)

Members of EPRI's Biomass Interest Group and made a 14 day tour of key European Biomass-to-Power installations in the fall of 2005. The group visited a variety of technologies, including gasification, co-firing, direct combustion, and combined heat and power facilities.

2005-12-22T23:59:59.000Z

168

Proceedings: EPRI Second Phased Array Inspection Seminar  

Science Conference Proceedings (OSTI)

The Second EPRI Phased Array Inspection Seminar focused on industrial applications of phased array technology that have been achieved to date or are planned for the near future. Presentations were made by developers of inspection techniques, inspection services vendors, and utility personnel who have performed inspections using arrays.

2001-11-28T23:59:59.000Z

169

Proceedings: 2009 ASME/EPRI Radwaste Workshop  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and reduce costs associated with radioactive waste management. The 32nd Annual ASME/EPRI Workshop facilitates this effort by communicating the technology and management improvements throughout the industry. This workshop, restricted to utility radwaste professionals, also serves to communicate practical in-plant improvements with the opportunity to discuss them in detail.

2009-11-04T23:59:59.000Z

170

Proceedings: EPRI/NERC forum on voltage stability  

SciTech Connect

Over the past two decades, the interconnected electric systems serving North America have been increasingly subjected to reductions in generation and transmission capacity reserves, increasing complexity of load character, and the need for power transfer over longer distances. As a result, voltage stability limitations are becoming an important factor for utility personnel to consider when designing and operating an electric system. To address this situation, EPRI and NERC cosponsored a forum to exchange information between the various sectors of the utility industry on voltage control technology. The forum covered available tools and practices; utility operating practices, procedures, and experiences; planning and operating studies; and energy management system (EMS) vendor viewpoints. Participants agreed that a continuing coordinated effort involving all industry groups was needed in the voltage stability area. Attendees also identified specific subject areas of importance to help direct future studies. Individual papers are indexed separately.

Maratukulam, D. (ed.) (Kennedy (Thomas), Florissant, MO (United States))

1993-05-01T23:59:59.000Z

171

Association of State Dam Safety Officials (ASDSO)/EPRI Spillway Gate Workshop: January 5 & 6, 2000  

Science Conference Proceedings (OSTI)

Maintaining the integrity of dams at hydroelectric projects is essential to the protection of communities, the surrounding environment, and the power and resource management infrastructure. The Spillway Gate Workshop, sponsored by the Association of State Dam Safety Officials (ASDSO) and EPRI, and with funding from the Federal Emergency Management Agency (FEMA), focused on a critical aspect of the safety issues related to analysis, inspection, maintenance, and performance of spillway gates. The intent of...

2000-06-16T23:59:59.000Z

172

Impacts of Particulate Matter on Human Health: An Updated Summary of EPRI Research  

Science Conference Proceedings (OSTI)

Hundreds of toxicological and epidemiological studies have been conducted over the past 20 years to better understand the effects of particulate matter (PM), and air pollution in general, on human health. Examples of environmental regulations and policies driven by these health concerns include the Environmental Protection Agency's (EPA's) National Ambient Air Quality Standards (NAAQS), as well as State Implementation Plans (SIPs) and multi-pollutant control legislation. EPRI's PM/Health Research Program...

2007-12-19T23:59:59.000Z

173

Maintaining Electrical System Reliability Under a Closed-Cycle Cooling Retrofit Requirement  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) is investigating the implications of a potential U.S. Environmental Protection Agency (EPA) Clean Water Act 316(b) rulemaking that would establish "best technology available" (BTA) based on closed-cycle cooling retrofits for facilities with once-through cooling. This report focuses on the transmission system impacts that can potentially result from a requirement for use of closed-cycle cooling systems.

2011-07-20T23:59:59.000Z

174

TransForum v7n1 - Electric Power Research Institute and Argonne...  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Power Research Institute and Argonne Agree to Collaboratively Assess Commerical Viability of Plug-In Hybrid Electric Vehicles The Electric Power Research Institute (EPRI)...

175

Distribution System Reliability Practices: Noteworthy Practices at Nashville Electric Service  

Science Conference Proceedings (OSTI)

In 2010, EPRI initiated a multiyear effort to identify and illustrate noteworthy practices that utilities are using to meet the service reliability expectations of their customers. EPRI research focused on four host utilities: Ameren Corporation, Central Hudson Gas & Electric Corporation, Alabama Power Company, and We Energies. In 2011, EPRI completed research at American Electric Power Company (AEP) and initiated research with Memphis Light, Gas and Water (MLGW) and Duke Energy. In 2012, EPRI ...

2013-10-29T23:59:59.000Z

176

EPRI Boiler Reliability Optimization Program: Case Studies from 1998-2001  

Science Conference Proceedings (OSTI)

The prospect of competing in a deregulated environment is driving utilities to explore more cost-effective means of operating and maintaining their plants. Recognizing this, a number of companies -- including American Electric Power, Great River Energy, Detroit Edison, Arizona Public Services Company, and Hawaiian Electric Company -- have participated in EPRI's Boiler Reliability Optimization Program. This report provides seven case studies demonstrating key aspects of the program.

2001-12-13T23:59:59.000Z

177

Description and Software Implementation for British Columbia Hydro’s Application of EPRI’s Dynamic Thermal Circuit Ratin g System  

Science Conference Proceedings (OSTI)

This report describes the functional changes needed to use the Electric Power Research Institutes (EPRIs) dynamic thermal circuit rating (DTCR) software to support a thermal model and real-time data input for thermally isolated (that is, single-phase) submarine alternating current power cables as part of a DTCR field test project for British Columbia (BC) Hydro. The report further describes some of the software implementation details and results of calculations based on field data provided by BC Hydro.

2011-04-05T23:59:59.000Z

178

FETC/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT  

DOE Green Energy (OSTI)

This quarter much progress was made in promoting cofiring through the many FETC/EPRI backed projects. During January 1, 1998 to March 31st, 1998 significant contractual agreements were arranged for future testing and analyses of previous testing were conducted. Most notable was the analysis done on the testing run at the Tennessee Valley Authority?s Colbert Fossil Plant that showed no significant impacts to the plant boiler due to cofiring. Northern Indiana Public Service Company also identified Bailly #7 as the site of the next series of tests using their plants. Other work done on these projects primarily focused on continued cofiring development. This report summarizes the activities during the first quarter in 1998 of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing in order to highlight the progress at utilities.

D. TILLMAN; E. HUGHES

1998-08-01T23:59:59.000Z

179

Proceedings: 2011 EPRI Condensate Polisher Conference  

Science Conference Proceedings (OSTI)

Successful condensate polishing operations maintain control of ionic and particulate impurity transport to the pressurized water reactor (PWR) steam generators, the fossil plant boilers, and the boiling water reactor (BWR) recirculation system and reactor, thus allowing these units to operate more reliably. This report contains the work presented at EPRI's 2011 Condensate Polishing Conference. Participants presented papers on current issues, research, and utility experiences involving polishing ...

2013-07-26T23:59:59.000Z

180

EPRI Increased Power Flow Guidebook -- 2011  

Science Conference Proceedings (OSTI)

The EPRI Increased Power Flow (IPF) Guidebook is a state-of-the-art and best-practices reference and guidebook on increasing the power flow capacities of existing overhead transmission lines, underground cables, power transformers, and substation equipment without compromising safety and reliability. The Guidebook discusses power system concerns and limiting conditions to increasing capacity, reviews available technology options and methods, illustrates the alternatives with case studies, and analyzes th...

2011-12-12T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Proceedings: EPRI 2009 Condensate Polishing Workshop  

Science Conference Proceedings (OSTI)

Successful condensate polishing operations maintain control of ionic and particulate impurity transport to the pressurized water reactor (PWR) steam generator, and to the boiling water reactor (BWR) reactor and recirculation system, thus allowing these units to operate more reliably. This report contains the work presented at EPRI's 2009 Condensate Polishing Conference. Participants presented papers on current issues, research, and utility experiences involving polishing issues at both PWR and BWR units.

2009-10-22T23:59:59.000Z

182

Proceedings: 2003 EPRI Workshop on Condensate Polishing  

Science Conference Proceedings (OSTI)

Successful condensate polishing operations maintain control of ionic and particulate impurity transport to the pressurized water reactor (PWR) steam generator and the boiling water reactor (BWR) reactor and recirculation system, thus allowing the units to operate more reliably. This report contains the work presented at EPRI's 2003 Workshop on Condensate Polishing, where 30 papers were presented on current issues, research, and utility experiences involving polishing issues at both PWR and BWR units.

2004-02-02T23:59:59.000Z

183

EPRI Power Switching Safety and Reliability Project  

Science Conference Proceedings (OSTI)

The EPRI Switching Safety and Reliability (SS&R) Project features 24 completed studies to date in seven broad subject areas: 1) switching process, 2) tools and technological aids used in the planning and execution of switching, 3) switching errors, 4) incident analysis and investigation, 5) management methods and processes, 6) training, and 7) definitions and terminology. This report presents the history and accomplishments of the SS&R project as well as the extent of penetration of its findings into uti...

2008-12-16T23:59:59.000Z

184

Proceedings: 2001 ASME/EPRI Radwaste Workshop  

SciTech Connect

Nuclear utilities continually evaluate methods to improve operations and reduce costs associated with radioactive waste management. The continuing deregulation process has increased the emphasis on this activity. The Annual ASME/EPRI Workshop facilitates this effort by communicating technology and management improvements throughout the industry. This workshop, restricted to utility radwaste professionals, also serves to communicate practical in-plant improvements with the opportunity to discuss them in detail.

None

2001-12-01T23:59:59.000Z

185

EPRI Distribution Reliability Practices Repository V2  

Science Conference Proceedings (OSTI)

A key objective of EPRI's research into distribution reliability practices is to identify, document and provide practice summary descriptions to research participants in a format that facilitates comparison and aids decision-makers in identifying those practices in place at other utilities which can be applied to their utility to improve performance. This research report presents distribution reliability practice results from six different companies in a repository which places ...

2013-11-27T23:59:59.000Z

186

Comparing the Benefits and Impacts of Hybrid Electric Vehicle Options for Compact Sedan and Sport Utility Vehicles  

Science Conference Proceedings (OSTI)

Download report 1006892 for FREE. This study continues the Hybrid Electric Vehicle Working Group (WG) project in which EPRI brought together representatives of the utility and automotive industries, along with those of the U.S. Department of Energy (DOE), other regulatory agencies, and university research organizations. The study, the third in a series of three studies, examines the performance, energy economy, fuel cycle emissions, costs, and consumer acceptance for compact and sports utility hybrid ele...

2002-07-23T23:59:59.000Z

187

Nondestructive Evaluation: 16th Annual EPRI NDE Issues Meeting  

Science Conference Proceedings (OSTI)

The 16th Annual EPRI NDE Issues Meeting Notes (EPRI product 1014606) contains all of the presentation and technical information presented during the annual nondestructive evaluation (NDE) meeting held May 89, 2006, in San Diego, California. The EPRI NDE Issues Meeting provides a forum in which all participants have an equal opportunity to discuss and exchange information concerning current and emerging NDE issues. Invited speakers add to the discussion through formal presentations on current industry is...

2006-12-20T23:59:59.000Z

188

15th Annual EPRI NDE Issues Meeting Notes  

Science Conference Proceedings (OSTI)

The 15th Annual EPRI NDE Issues Meeting Notes (EPRI product 1012620) contains all of the presentations and technical information presented during the annual nondestructive evaluation (NDE) meeting held July 26-27, 2005, at Myrtle Beach, South Carolina. The EPRI NDE Issues Meeting provides a forum in which all participants have an equal opportunity to discuss and exchange information concerning current and emerging NDE issues. Invited speakers add to the discussion through formal presentations on current ...

2005-10-06T23:59:59.000Z

189

Nondestructive Evaluation: 17th Annual EPRI NDE Issues Meeting Notes  

Science Conference Proceedings (OSTI)

The annual EPRI Nondestructive Evaluation (NDE) Issues Meeting provides a forum for participants to discuss and exchange information concerning current and emerging NDE issues.

2007-09-27T23:59:59.000Z

190

NRC/EPRI Welding Residual Stress Validation Program (Phase III)  

Science Conference Proceedings (OSTI)

The NRC/EPRI weld residual stress (WRS) program currently consists of four phases, with each phase increasing in complexity from lab size specimens to ...

191

DOE/NETL & EPRI Sponsored Mercury Measurements Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

NETL & EPRI Sponsored Mercury Measurements Workshop July 13, 2004 Table of Contents Disclaimer Papers and Presentations Disclaimer This report was prepared as an account of work...

192

EPRI steam-turbine-related research projects  

SciTech Connect

The current perspective is provided of EPRI-project activities that relate to steam turbine reliability. Compiling status information is a part of the planning effort for continuing projects on turbine rotor reliability, turbine chemistry monitoring and materials behavior, and for the proposed project related to cracking of shrunk-on discs in low pressure nuclear steam turbines. This document includes related work beyond the steam turbine itself to cover those research projects whose scope and results impact the efforts specific to the turbine.

Gelhaus, F.; Jaffee, R.; Kolar, M.; Poole, D.

1978-08-01T23:59:59.000Z

193

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT  

DOE Green Energy (OSTI)

During the period of January 1, 1999 through March 31, 1999, construction was performed in support of two major demonstrations. Major progress was made on several projects including cofiring at Seward (GPU Genco), and Bailly (NIPSCO). Most of the work was focused on construction and system commissioning activities at the Seward and Bailly Generating Stations. Additionally, petroleum coke cofiring testing was completed at the Bailly Generating Station. This report summarizes the activities during the first calendar quarter in 1999--the fourth contract quarter in 1998--of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction activities and related events.

D. Tillman; E. Hughes

1999-04-01T23:59:59.000Z

194

EPRI Zed-Meter Construction Guide  

Science Conference Proceedings (OSTI)

EPRI developed the Zed-Meter to effectively evaluate transmission line structure grounding. The Zed-Meter has a number of advantages that include faster implementation, provision of an indication of impedance rather than resistance, and shield wires that do not need to be disconnected. The Zed-Meter is constructed from several off-the-shelf components together with software. This report outlines the way in which a Zed-Meter can be constructed by a utility and how to install the software. This document is...

2010-12-23T23:59:59.000Z

195

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT  

DOE Green Energy (OSTI)

During the period of July 1, 2000 through September 30, 2000, alternatives for relocating the Seward Generating Station cofiring project were investigated. Allegheny Energy Supply Company LLC will accept the separate injection demonstration at its Albright Generating Station. During this period, also, efforts were made at program outreach. Papers were given at the Pittsburgh Coal Conference. This report summarizes the activities during the second calendar quarter in 2000 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of the relocation of Seward, and on the outreach efforts.

E. Hughes; D. Tillman

2000-10-01T23:59:59.000Z

196

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT  

DOE Green Energy (OSTI)

During the period of April 1, 1999 through June 30, 1999, wood cofiring testing at both Seward Generating Station of GPU Genco and Bailly Generating Station of Northern Indiana Public Service Company provided the focus for all activities. In both cases, the testing was directed at the impacts of cofiring on efficiency, operability, and NO{sub x} emissions. This report summarizes the activities during the second calendar quarter in 1999 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing activities at both generating stations.

D. Tillman; E. Hughes

1999-07-01T23:59:59.000Z

197

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT  

DOE Green Energy (OSTI)

During the period of April 1, 2000 through June 30, 2000, alternatives for relocating the Seward Generating Station cofiring project were investigated. A test was conducted at Bailly Generating Station of Northern Indiana Public Service Co., firing a blend of Black Thunder (Powder River Basin) coal and Illinois basin coal, in cyclone boiler designed for Illinois basin coal. This test at Bailly was designed to determine the technical feasibility of cofiring at that station using PRB coals. This report summarizes the activities during the second calendar quarter in 2000 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction and testing activities at these generating stations.

E. Hughes; D. Tillman

2000-07-01T23:59:59.000Z

198

EPRI's Pulverized Coal Post-Combustion CO2 Capture Retrofit Study Summary (Supplemental Project Funders' Issue)  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) is currently examining the feasibility of retrofitting post-combustion capture (PCC) of CO2 to existing pulverized coal (PC) and/or circulating fluidized-bed (CFB) power plants for five different "host" participants. Knowledge gained from previous CoalFleet ultra-supercritical (USC) PCC design studies is being applied directly to specific site conditions, plant design, and operating data provided by each host utility participant. This overall project intends t...

2011-03-31T23:59:59.000Z

199

EPRI's Pulverized Coal Post-Combustion CO2 Capture Retrofit Study Summary  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) is currently examining the feasibility of retrofitting post-combustion capture (PCC) to existing pulverized coal (PC) and/or circulating fluidized-bed power plants, for five different "host" participants. Knowledge gained from previous ultra supercritical (USC) PCC design studies by CoalFleet is being applied directly to specific site conditions, plant design, and operating data provided by each host utility participant. This overall project aims to highlight ...

2010-12-31T23:59:59.000Z

200

2004 AESP/EPRI Pricing Conference: What's Working and What's Needed  

Science Conference Proceedings (OSTI)

EPRI and the Association of Energy Service Professionals (AESP) held the eighth Electricity Pricing Conference in Chicago on May 18 - 19, 2004. The conference featured presentations by more than 20 speakers representing utilities, consulting firms, and research organizations. The conference was attended by some 60 experts who actively participated in discussions with the presenters and each other. The focus of the Pricing Conference was "what is working now and what is needed for the future" in terms of ...

2004-12-07T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EPRI Materials Management Matrix Project Gap and Opportunity Assessment: Revision 0  

Science Conference Proceedings (OSTI)

An opportunity exists to leverage operating plant experience by proactively identifying and addressing materials performance issues for advanced light water reactor (ALWR) designs currently under consideration for new construction. The Electric Power Research Institute's (EPRI's) Advanced Nuclear Technology (ANT) program Materials Management Matrix (MMM) project was initiated to identify important materials performance issues. This report provides a distillation of the important gaps and opportunities id...

2011-12-01T23:59:59.000Z

202

EPRI Materials Management Matrix Project: U.S.--Advanced Pressurized Water Reactor Materials Management Tables  

Science Conference Proceedings (OSTI)

The Electric Power Research Institutes (EPRIs) Advanced Nuclear Technology (ANT) Program has initiated a Materials Management Matrix (MMM) initiative to systematically assess new plant designs and identify gaps and opportunities that, if addressed at appropriate times in the life cycle of a plant, could significantly improve performance of the materials used in new plant designs. Products developed by this initiative are intended to be living reports that will be periodically updated through the licensin...

2011-06-17T23:59:59.000Z

203

EPRI Phased Array Performance Demonstration for Axial Entry Blade Attachment Inspection - Technical Update  

Science Conference Proceedings (OSTI)

The disk rim blade attachment area is one of the most highly stressed components of the steam turbine rotor. Reliable and accurate inspection of the disk rim blade attachment area is essential for the determination of rotor operability and remaining life. The purpose of the Electric Power Research Institute's (EPRI's) Phased Array Performance Demonstration for Axial Entry Blade Attachment Inspection Project is to determine the inspection performance levels of commercial entities offering these inspection...

2008-12-22T23:59:59.000Z

204

Coordination of EPRI Risk Ranking Methodologies for Nuclear Power Plant Groundwater Protection & Underground Piping Programs  

Science Conference Proceedings (OSTI)

The nuclear power industry committed to the Groundwater Protection Initiative (GPI) and the Underground Piping and Tanks Initiative (UPTI) to improve the management of soil and groundwater contamination, and the management of underground piping and tanks. These two Initiatives, while they have different objectives, are closely aligned in the area of preventing leaks and spills of licensed materials. The results of this Electric Power Research Institute (EPRI) work will provide nuclear power plant sites w...

2011-12-14T23:59:59.000Z

205

EPRI Transmission Line Reference Book: Wind-Induced Conductor Motion (Orange Book) Revision  

Science Conference Proceedings (OSTI)

This report is an updated edition of the longtime industry standard on vibration, EPRI Transmission Line Reference Book: Wind-Induced Conductor Motion, the "Orange Book," which was last issued in 1979. Publication of this new edition is the culmination of three years of research by an international team of experts in the field. The report includes the latest information on research, technology, and materials and represents a significant contribution to the global industry of electric power transmission.

2009-03-27T23:59:59.000Z

206

Nondestructive Evaluation: 11th EPRI Balance-of-Plant Heat Exchanger NDE Symposium Proceedings  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute's (EPRI's) 11th Balance-of-Plant Heat Exchanger Nondestructive Evaluation Symposiumheld in Stevenson, Washington, August 911, 2010 focused on nondestructive evaluation (NDE) technologies and lessons learned related to the inspection, condition assessment, and repair of balance-of-plant (BOP) heat exchanger components. As in the past, this year's symposium included pre-symposium tutorial courses followed by technology transfer through paper presentations and the vendo...

2010-09-30T23:59:59.000Z

207

Assessment of EPRI Fuel Reliability Guidelines for New Nuclear Plant Designs  

Science Conference Proceedings (OSTI)

As the nuclear power industry pursues the licensing, construction and operation of new advanced LWR designs to meet growing electrical demand, a high level of fuel reliability will be a key factor in the ultimate acceptance and sustainability of these new plants. The new reactor designs under consideration by the industry will utilize fuel assembly/rod designs and operating conditions that are similar to the current fleet. This report assesses the applicability of the EPRI Fuel Reliability Program (FRP) ...

2009-12-09T23:59:59.000Z

208

EPRI-CRIEPI Joint Human Factors Program Summary Report: Joint EPRI-CRIEPI Human Factors Studies  

Science Conference Proceedings (OSTI)

The EPRI-CRIEPI Joint Human Factors Program developed an array of intervention products that provide logical solutions to performance problems confronting nuclear power plant maintenance workers. These products, designed to reduce the incidence of errors and increase productivity, range from job performance cards to a software-based authoring system for training material.

1995-01-24T23:59:59.000Z

209

Program on Technology Innovation: Review of EPRI Advanced Light Water Reactor Utility Requirement Document to Include Small Modular Light Water Reactors  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) conducted a limited scope assessment to better understand what areas of the current EPRI advanced light water reactor (ALWR) Utility Requirement Document (URD) should be modified to ensure that the document is applicable to light water small modular reactors (LWSMRs). The LWSMRs differ from current light water reactors in that LWSMRs are significantly smaller than existing plants and utilize revolutionary design and construction strategies.

2011-04-25T23:59:59.000Z

210

Driving Plug-In Hybrid Electric Vehicles: Reports from U.S. Drivers of HEVs converted to PHEVs, circa 2006-07  

E-Print Network (OSTI)

Assessment for Battery Electric Vehicles, PowerAssist Hybrid Electric Vehicles, and Plug-in Hybrid Electric Vehicles. EPRI: Palo Alto, CA.

Kurani, Kenneth S; Heffner, Reid R.; Turrentine, Tom

2008-01-01T23:59:59.000Z

211

Proceedings: Second Annual EPRI Workshop on Power Plant Optimization: St. Louis, Missouri, May 12-13, 1998  

Science Conference Proceedings (OSTI)

The growing impetus to reduce costs of NOx compliance and electricity production has accelerated deployment of power plant optimization software in the utility industry. The Second Annual EPRI Workshop on Power Plant Optimization held in St. Louis on May 12-13, 1998 provided a forum for utilities to assess available power plant optimization software and review the application experience to date.

1998-09-30T23:59:59.000Z

212

Proceedings: 1995 EPRI International Low-Level Waste Conference  

Science Conference Proceedings (OSTI)

EPRI's fourth annual International Low-Level Waste (LLW) Conference featured 72 papers on a variety of topics. Some of the subjects included were interim storage experiences; liquid, wet, and DAW improved processing and technology; mixed waste; decontamination; and building public trust. In addition, a nuclear industry and EPRI LLW projects update was presented.

1995-12-05T23:59:59.000Z

213

Proceedings: EPRI International Decommissioning and Radioactive Waste Workshop at Dounreay  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI international workshop on decommissioning and radioactive waste management. EPRI initiated this continuing workshop series to aid utility personnel in assessing the technologies utilized in the decommissioning of nuclear power plants and facilities. The information presented will help individual utilities assess the benefits of the various programs, including their potential to reduce decommissioning costs.

2003-01-29T23:59:59.000Z

214

Proceedings of the Third EPRI Phased Array Ultrasound Seminar  

SciTech Connect

Phased array technology for ultrasonic examination is providing innovative solutions for nuclear in-service examination applications. EPRI has been a prime mover in the development and deployment of phased array ultrasound applications in the domestic nuclear market over the past decade. As part of this strategic effort, EPRI has hosted a series of seminars on phased array technology and its applications.

None

2003-12-01T23:59:59.000Z

215

Proceedings: 3rd EPRI Optical Sensor Systems Workshop  

SciTech Connect

These are the proceedings of the third Optical Sensor System Workshop, part of an ongoing effort by EPRI to support development of optical sensor technology, to identify benefits for utility users, and to position EPRI members as more ''informed buyers'' and users.

None

2002-02-01T23:59:59.000Z

216

Department of Energy, Duke Energy and EPRI Partner to Test Advanced...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Duke Energy and EPRI Partner to Test Advanced Energy Technologies for Utilities Department of Energy, Duke Energy and EPRI Partner to Test Advanced Energy Technologies for...

217

Light Water Reactor Sustainability Program FY13 Status Update for EPRI - RISMC Collaboration  

Science Conference Proceedings (OSTI)

The purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development (R&D) is to support plant decisions for risk-informed margins management with the aim to improve economics, reliability, and sustain safety of current NPPs. Goals of the RISMC Pathway are twofold: (1) Develop and demonstrate a risk-assessment method coupled to safety margin quantification that can be used by NPP decision makers as part of their margin recovery strategies. (2) Create an advanced "RISMC toolkit" that enables more accurate representation of NPP safety margin. In order to carry out the R&D needed for the Pathway, the Idaho National Laboratory (INL) is collaborating with the Electric Power Research Institute (EPRI) in order to focus on applications of interest to the U.S. nuclear power industry. This report documents the collaboration activities performed between INL and EPRI during FY2013.

Curtis Smith

2013-09-01T23:59:59.000Z

218

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT  

DOE Green Energy (OSTI)

During the period of October 1, 1998 through December 31, 1998, significant work was done in direct preparation for several cofiring tests. Major progress was made on several projects including cofiring at Seward (GPU Genco), Allen (TVA), and Bailly (NIPSCO). Most of the work was focused on construction activities at the Seward and Bailly Generating Stations. The conceptual design and feasibility study for gasification-based cofiring at the Allen Fossil Plant was completed. The feasibility study for cofiring at the Pirkey and Northeastern Generating Stations of Central and South West Utilities (C&SW) also was completed. This report summarizes the activities during the fourth calendar quarter in 1998--of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction activities and related events.

D. Tillman; E. Hughes

1999-01-01T23:59:59.000Z

219

FETC/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT  

DOE Green Energy (OSTI)

During April 1 st , 1998 to June 31 st , 1998, significant work was done in preparation for a series of test involving cofiring at power plants. A biomass material handling system was designed for the Seward testing, a gasification system was designed for the Allen Fossil Plant, and a test program plan was developed for testing at NIPSCO?s Bailly Station. Also completed this quarter was a cyclone combustion model that provides a color visual representation of estimated temperatures within a plant. This report summarizes the activities during the second quarter in 1998 of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing in order to highlight the progress at utilities.

D. TILLMAN; E. HUGHES

1998-08-01T23:59:59.000Z

220

EPRI Mobile Geothermal Chemical Analysis Trailer  

DOE Green Energy (OSTI)

The EPRI Mobile Geothermal Chemical Analysis Trailer, fabricated by the Energy Systems Group of Rockwell International, is a modern well-equipped chemical analysis laboratory. This mobile laboratory, sketched in Figure 1, has complete capability for sampling of geothermal fluids and analysis of brine, steam, and noncondensible gases. The objective of the laboratory is to provide accurate onsite chemical analyses in a timely manner that results in preservation of the sample integrity and the efficient implementation of a test program. The laboratory is built on a standard 40-ft truck trailer bed. The trailer chassis has been modified to carry requisite gas cylinders, compressor, and vacuum pump equipment in undercarriage bins, and has been equipped with air-ride shock absorbers to minimize road vibrations.

Eaton, W.S.; Nealy, C.L.; Sudar, S.

1980-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

2012 SG Peer Review - Day 2 Panel Discussion: Matt Wakefield, EPRI  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Matt Wakefield Matt Wakefield Senior Program Manager, Smart Grid June 7, 2012 Overview & Industry Coordination of EPRI IntelliGrid & Security Research & Smart Grid Demonstrations 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. IntelliGrid Program Information & Communication Technologies (ICT) to Enable..... The IntelliGrid Program conducts research, development and demonstrations on the Information and Communications Technologies (ICT) that Enable Smart Grid applications IntelliGrid * Transmission * Distribution * End-Use (AMI/DR) 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. * Reliability and performance characteristics the various technology

222

Evaluation of solar radiation measurement systems: EPRI/NREL final test report. Volume 1  

DOE Green Energy (OSTI)

Measured solar radiation resource data are needed by electric utilities to evaluate the potential of renewable energy options like photovoltaics in their service territory. In this final test report, we document a cooperative project of the Electric Power Research Institute (EPRI) and the National Renewable Energy Laboratory (NREL) to compare available measurement system options for performing solar radiation resource assessments. We present the detailed results of a 6-month field comparison of thermopile-based pyranometer and pyrheliometer solar irradiance measurement systems with two different implementations of the rotating shadowband radiometer (RSR) concept installed at NREL`s Solar Radiation Research Laboratory (SRRL) in Golden, Colorado.

Stoffel, T.; Riordan, C.; Bigger, J.

1992-11-01T23:59:59.000Z

223

Evaluation of solar radiation measurement systems: EPRI/NREL final test report  

DOE Green Energy (OSTI)

Measured solar radiation resource data are needed by electric utilities to evaluate the potential of renewable energy options like photovoltaics in their service territory. In this final test report, we document a cooperative project of the Electric Power Research Institute (EPRI) and the National Renewable Energy Laboratory (NREL) to compare available measurement system options for performing solar radiation resource assessments. We present the detailed results of a 6-month field comparison of thermopile-based pyranometer and pyrheliometer solar irradiance measurement systems with two different implementations of the rotating shadowband radiometer (RSR) concept installed at NREL's Solar Radiation Research Laboratory (SRRL) in Golden, Colorado.

Stoffel, T.; Riordan, C.; Bigger, J.

1992-11-01T23:59:59.000Z

224

Data Quality Evaluation of Hazardous Air Pollutants Measurements for the US Environmental Protection Agency's Electric Utility Steam Generating Units Information Collection Request  

Science Conference Proceedings (OSTI)

In December 2009, the U.S. Environmental Protection Agency (EPA) issued an Information Collection Request (ICR) to owners of fossil fuel-fired, electric steam generating units. Part III of the ICR required that almost 500 selected power plant stacks be tested for emissions of four groups of substances classified as hazardous air pollutants under the Clean Air Act: acid gases and hydrogen cyanide; metals; volatile and semivolatile organics; and polychlorinated dibenzodioxins, dibenzofurans, and polychlori...

2010-12-18T23:59:59.000Z

225

Microsoft Word - DOE EPRI MOU.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum of Understanding on Electric Utility Energy Efficiency, Demand Response, and the Smart Grid Between The United States Department of Energy And The Electric Power...

226

Lightning Activities in the DOE-EPRI Turbine Verification Program  

DOE Green Energy (OSTI)

The US Department of Energy (DOE)-Electric Power Research Institute (EPRI) Turbine Verification Program (TVP) has played a vital role in improving the understanding of lightning protection for wind turbines. In response to concerns from host utilities, the TVP began a lightning protection project to study the impact of lightning activity at the 6.0-megawatt (MW) wind power facility in Ft. Davis, Texas. McNiff Light Industry (MLI) and Global Energy Concepts (GEC) established a broad observation and documentation effort to survey the lightning protection methodologies used and to evaluate the damage resulting from lightning activity at the turbines. The 6.05-MW wind power plant in Searsburg, Vermont, was inspected after a severe lightning storm caused damage to several turbines there. Zond, McNiff, and consultants from Lightning Technologies, Inc. conducted post-damage inspections at both sites to develop recommendations for improving lightning protection. Site operators implemented the recommended mitigation strategies, and the turbines were monitored to determine if the protection measures improved project operations. This paper summarizes the experience gained through TVP's lightning-related research, and provides a set of guidelines for wind turbine manufacturers, owners, and operators.

McCoy, T.; Rhoads, H.; Lisman, T. (Global Energy Concepts, LLC); McNiff, B. (McNiff Light Industry); Smith, B. (National Renewable Energy Laboratory)

2000-09-11T23:59:59.000Z

227

Guidance to the Electric Power Industry for Implementing Environmental Protection Agency's 2001 Methylmercury Water Quality Criterio n  

Science Conference Proceedings (OSTI)

Adoption of the U. S. Environmental Protection Agency's (EPA's) methylmercury fish tissue criterion in 2001 raised many issues for permitting agencies and for individual discharges. Among them is how to translate from a tissue-based criterion to a water-column criteria for methylmercury. Adoption of a methylmercury standard requires translation to other forms of mercury if, for instance, permits continue to be written in terms of total recoverable mercury. This report covers a number of topics raised by ...

2009-12-03T23:59:59.000Z

228

Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)  

SciTech Connect

The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

J. H. Jackson; S. P. Teysseyre

2012-02-01T23:59:59.000Z

229

Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)  

SciTech Connect

The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

J. H. Jackson; S. P. Teysseyre

2012-10-01T23:59:59.000Z

230

EPRI's Water & Sustainability Initiative & Public/Private Partnerships  

NLE Websites -- All DOE Office Websites (Extended Search)

19, 2003 - 12:00pm Location: Bldg. 90 Dr. William M. Smith is the Manager, Market-Driven Demand Response at EPRI. He is responsible for developing information, tools, and...

231

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT  

DOE Green Energy (OSTI)

The Eleventh Quarter of the USDOE-EPRI contract, April 1, 1999 through June 30, 1999, was characterized by extensive testing at the Seward cofiring demonstration of GPU Genco and the Bailly Unit No.7 demonstration of NIPSCO. Technical work that proceeded during the eleventh quarter of the contract included the following: Testing at up to {approx}15 percent cofiring on a mass basis ({approx}7 percent cofiring on a Btu basis) at the Seward Generating Station No.12 boiler, focusing upon the operability of the separate injection system and the combustion/emission formation characteristics of the cofiring process; and Testing at up to {approx}10 percent cofiring of waste wood on a mass basis ({approx}5 percent cofiring on a Btu basis) at the Bailly Generating Station No.7 boiler, focusing upon the impacts of urban wood waste blended with a mixture of eastern high sulfur coal and western low sulfur coal Both tests demonstrated the following general, and expected, results from cofiring at these locations: (1) Cofiring did not impact boiler capacity; (2) Cofiring did cause a modest reduction in boiler efficiency; (3) Cofiring did reduce NOx emissions; (4) Cofiring did reduce fossil CO2 emissions; and (5) Other impacts of cofiring were modest.

D. Tillman; E. Hughes

1999-07-01T23:59:59.000Z

232

Plug-In Hybrid Electric Vehicle Environmental Analysis--Electric Sector Modeling of CO2 Emissions  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute has initiated a comprehensive collaborative study to quantify the environmental impacts of electric transportation, specifically with respect to plug-in hybrid electric vehicles (PHEVs). This technical update describes the adaptation of the EPRI electric sector model for the analysis of CO2 emissions from the charging on PHEVs on the electrical grid. A "PHEV Base Case" was developed using baseline assumptions from the "EPRI Base Case," a nominal set of key assumptio...

2006-11-29T23:59:59.000Z

233

EPRI EMF Exposure Database: Telephone Line Workers Data Set  

Science Conference Proceedings (OSTI)

Researchers at Johns Hopkins University provided data from the EPRI-sponsored Leukemia in Telephone Linemen Study (WO2964-04) for inclusion in the EPRI EMF Exposure Database. This data set contains three data products related to measurements of magnetic field personal exposure: binary and ASCII time-series files of individual measurements and a summary file for each measured worker. The documentation associated with this data set includes a project synopsis, descriptions of all data elements, and the for...

1996-10-31T23:59:59.000Z

234

EPRI Comments on the BioInitiative 2012 Report  

Science Conference Proceedings (OSTI)

BioInitiative 2012 has been issued as a follow-up to the BioInitiative Working Group’s (BWG) 2007 report (updated in 2010). An EPRI Comments document (EPRI 1016233) following the 2007 BWG report indicated that (1) its content referenced only selective portions of the scientific literature on health effects associated with electromagnetic fields, rather than focusing on the full weight of evidence; and (2) the BWG report’s conclusions were inconsistent with those of many expert ...

2013-03-22T23:59:59.000Z

235

Program on Technology Innovation: EPRI Workshop on Radiofrequency Exposure Assessment  

Science Conference Proceedings (OSTI)

EPRI’s Radiofrequency (RF) Exposure Assessment Workshop—held October 18, 2012, in Washington, D.C.—brought together experts in the area of RF emission characterization, instrumentation, exposure assessment, and epidemiology. The main goal of the workshop was to develop a roadmap for a future study to characterize the RF exposure pattern in the human population and determine, if possible, the contribution of various sources and environments to the overall exposure. As a result, the ...

2013-06-10T23:59:59.000Z

236

Updating the EPRI Underground Transmission Systems Reference Book  

Science Conference Proceedings (OSTI)

EPRI is sponsoring the development of a new updated edition of the Underground Transmission Systems Reference Book (EPRI report TR-101670), which was originally published in 1992. Published in the first edition with a green cover, the book has become commonly known throughout the industry as the Green Book. Since publication of the first edition, there have been significant changes in both technology and the needs of utilities. This project will compile the most up-to-date technical information on underg...

2005-11-07T23:59:59.000Z

237

Summary of EPRI Cooling System Effects Research 1975-1993  

Science Conference Proceedings (OSTI)

Twenty years of EPRI-sponsored research on cooling system effects have led to substantial cost savings by reducing utility data collection requirements and, in some cases, showing that cooling towers were unnecessary. This document highlights past and current EPRI projects that address environmental concerns related to power plant cooling systems. It will be particularly useful to utility environmental managers responsible for compliance with the Clean Water Act.

1994-11-16T23:59:59.000Z

238

The EPRI Greenhouse Gas Emissions Offset Policy Dialogue  

Science Conference Proceedings (OSTI)

In 2008, EPRI launched the EPRI Greenhouse Gas (GHG) Emissions Offset Policy Dialogue project. The goals of this project are to inform key constituencies involved in the development of U.S. climate mitigation strategies and policies about GHG emissions offset-related policies and design issues, and to provide a forum in which representatives of key sectors of the U.S. economy and communities involved in the ongoing development and debate on climate change policies can discuss these issues. This Technical...

2008-12-23T23:59:59.000Z

239

14th Annual EPRI NDE Issues Meeting Notes  

Science Conference Proceedings (OSTI)

The 14th Annual EPRI NDE Issues Meeting Notes contains all presentations and technical information presented during the annual NDE meeting held July 27-28, 2004 at Hilton Head, South Carolina. The annual EPRI NDE Issues Meeting provides a forum in which all participants have an equal opportunity to discuss and exchange information concerning current and emerging nondestructive evaluation (NDE) issues. Invited speakers add to the discussion through formal presentations on current industry issues that are ...

2004-10-20T23:59:59.000Z

240

EPRI Feedback Pilot Design Workshops: Context and Workshop Materials  

Science Conference Proceedings (OSTI)

EPRI held two Feedback Pilot Design Workshops in 2010 in Columbus, Ohio (hosted by AEP Ohio) and in Dallas, Texas. The workshops were based on the 2010 EPRI report entitled "Guidelines for Designing Effective Energy Information Feedback Pilots: Research Protocols" (Product ID 1020855), which provides guidelines on using experimental design in order to clearly attribute pilot impacts to the feedback treatments. The workshops were developed to guide utilities through the process of using the protocols, as ...

2010-12-08T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Proceedings: EPRI 11th Annual NDE Issues Meeting  

SciTech Connect

For the past 10 years, EPRI has transferred research and applications solutions to its subscribing members during this annual event. At this meeting, members are invited to provide important feedback on emergent issues, solutions needed, and desired direction of the EPRI Nondestructive Evaluation (NDE) Center. The 11th Annual NDE Issues Meeting was held July 16-18, 2001, in Toronto, Ontario, Canada, and was hosted by Ontario Power Generation.

None

2001-10-01T23:59:59.000Z

242

DOE-EPRI On-Line Monitoring Implementation Guidelines  

SciTech Connect

OAK B139 Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasibility of on-line monitoring at several participating nuclear plants. The results have been very encouraging, and substantial progress is anticipated in the coming years.

E. Davis; R. Bickford

2003-01-02T23:59:59.000Z

243

EPRI-GTC Overhead Electric Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

This report explains and documents a standardized process that utilities could use to improve the way transmission line routes are evaluated and selected.

2006-02-06T23:59:59.000Z

244

Distribution System Reliability Practices: Noteworthy Practices at DTE Electric  

Science Conference Proceedings (OSTI)

 In 2010, EPRI initiated a multiyear effort to identify and illustrate noteworthy practices that utilities are using to meet the service reliability expectations of their customers. EPRI research focused on four host utilities: Ameren Corporation, Central Hudson Gas & Electric Corporation, Alabama Power Company, and We Energies. In 2011, EPRI completed research at American Electric Power Company (AEP) and initiated research with Memphis Light, Gas and Water (MLGW) and Duke Energy. In 2012, ...

2013-04-16T23:59:59.000Z

245

Distribution System Reliability Practices: Noteworthy Practices at American Electric Power  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute's (EPRI's) members represent more than 90% of the electricity generated and delivered in the United States, and international participation extends to 40 countries. Participation by such a large cross section of the utility industry provides EPRI with a unique ability to reach out to and learn from a wide variety of utility companies. This level of exposure is a distinct advantage for this type of research, in which EPRI is documenting and sharing noteworthy practice...

2011-11-09T23:59:59.000Z

246

United States Government or any agency thereof. Assessment of Future Vehicle Transportation Options and Their Impact on the Electric Grid  

E-Print Network (OSTI)

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed therein do not necessarily state or reflect those of the

Justin Adder

2011-01-01T23:59:59.000Z

247

EPRI Live Working Project: Summaries of Published Reports 1983-2012 and Listing of Presentations at EPRI and Other Live Working Conferences  

Science Conference Proceedings (OSTI)

EPRI has been conducting research in the area of live working for several decades. This research has resulted in a large number of reports and other products. To help users locate the results of EPRI’s research in live working, this annual update provides brief descriptions of relevant EPRI products.BackgroundLive work – the performance of maintenance, construction, or testing on equipment and circuits that are energized or that may become ...

2013-08-12T23:59:59.000Z

248

EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines: Technical Papers  

Science Conference Proceedings (OSTI)

This report presents the proceedings of a conference held to discuss developments in the field of environmentally friendly hydroturbines. The Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE), in cooperation with the U.S. Army Corps of Engineers (USACE), the U.S. Bureau of Reclamation (USBR), and the National Hydropower Association (NHA), conducted the conference May 19–20, 2011, in Washington, D.C., to disseminate information on the state of the art in environmentally enha...

2011-12-07T23:59:59.000Z

249

Power Performance Testing Progress in the DOE/EPRI Turbine Verification Program  

DOE Green Energy (OSTI)

As part of the U.S. Department of Energy/Electric Power Research Institute (DOE-EPRI) Wind Turbine Verification Program (TVP), tests are conducted to characterize the power performance of individual wind turbines at each wind project. The testing is performed in a variety of terrain types, including mountains, plains, deserts, and coastal tundra; and under a wide range of atmospheric conditions, from arid to arctic. Initial results and experiences of the testing were reported the WindPower 2000 conference. This paper presents the status of the power performance testing and new results from the past year.

Smith, B. (National Renewable Energy Laboratory); Randall, G.; McCoy, T; Vandenbosche, J. (Global Energy Concepts, LLC)

2001-07-18T23:59:59.000Z

250

A REVIEW OF ASSUMPTIONS AND ANALYSIS IN EPRI EA-3409,"HOUSEHOLD APPLIANCE CHOICE: REVISION OF REEPS BEHAVIORAL MODELS"  

SciTech Connect

This paper revises and extends EPRI report EA-3409, ''Household Appliance Choice: Revision of REEPS Behavioral Models.'' That paper reported the results of an econometric study of major appliance choice in new residential construction. Errors appeared in two tables of that report. We offer revised versions of those tables, and a brief analysis of the consequences and significance of the errors. The present paper also proposes several possible extensions and re-specifications of the models examined by EPRI. Some of these are judged to be highly successful; they both satisfy economic intuition more completely than the original specification and produce a better quality fit to the dependent variable. We feel that inclusion of these modifications produces a more useful set of coefficients for economic modeling than the original specification. This paper focuses on EPRI's models of residential space heating technology choice. That choice was modeled as a nested logit structure, with consumers choosing whether to have central air conditioning or not, and, given that choice, what kind of space heating system to have. The model included five space heating alternatives with central cooling (gas, oil, and electric forced-air; heat pumps; and electric baseboard) and eight alternatives without it (gas, oil, and electric forced-air; gas and oil boilers and non-central systems; and electric baseboard heat). The structure of the nested logit model is shown in Figure 1.

Wood, D.J.; Ruderman, H.; McMahon, J. E.

1989-05-01T23:59:59.000Z

251

2005 EPRI PowerPoint Template  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Effect 2007 R&D100 Award Winner SGTO Device - Performance Driver 6 2008 Electric Power Research Institute, Inc. All rights reserved. Deliverables * SSFCL looks like a...

252

Plant Engineering: Aging Degradation of Coating Service Level 1 Coatings Summary of EPRI Coating Aging Project Activities  

Science Conference Proceedings (OSTI)

The nuclear industry has experienced some instances of degradation of safety-related coating systems applied inside reactor containment. Although degradation has become a concern to the industry, the industry lacked a thoroughly documented history of the degradation and its causes. In response, the Electric Power Research Institute (EPRI) conducted research to understand the coating degradation and evaluate the effects of aging on the qualified coatings used inside containment. This report describes the ...

2011-10-24T23:59:59.000Z

253

EPRI Materials Management Matrix Project: Advanced Light-Water Reactor - Pressurized Water Reactor Degradation Matrix - Revision 1  

Science Conference Proceedings (OSTI)

The Advanced Light Water Reactor - Pressurized Water Reactor Degradation Matrix (ALWR PWR DM) is an integral piece of the Electric Power Research Institutes (EPRIs) Materials Management Matrix (MMM) initiative for ALWR designs. The MMM provides a tool to assist the industry in proactive identification and consideration of materials issues and mitigation/management opportunities from the design phase through component fabrication and plant construction to operations and maintenance.

2010-09-22T23:59:59.000Z

254

EPRI Power Switching Safety and Reliability Project: Summaries of Published Reports and Listing of Conference Presentations 1996--2011  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Switching Safety and Reliability (SS&R) Project was initiated in 1996. As of December of 2011, this project had published 46 products, including software and a training DVD, covering seven broad subject areas: Studies of the switching process Studies of tools and technological aids used in the planning and execution of switching Studies of switching errors Incident analysis and investigation Studies of management methods and processes Training and operator qua...

2012-07-17T23:59:59.000Z

255

Plant Engineering: Aging Degradation of Coating Service Level I Coatings—Summary of EPRI Coating Aging Project Activities  

Science Conference Proceedings (OSTI)

The nuclear industry experienced some instances of degradation of safety-related coating systems applied inside the reactor containment. These instances of degradation became a concern to the industry, but the industry did not have a thoroughly documented history of the degradation or its causes. In response, the Electric Power Research Institute (EPRI) formed a project that conducted research to gain an understanding of the coating degradation and evaluate the effects of aging on the qualified ...

2013-06-28T23:59:59.000Z

256

Comparison of American Petroleum Institute 579/American Society of Mechanical Engineers FFS1 with EPRI Life Assessment Guidelines  

Science Conference Proceedings (OSTI)

The American Society of Mechanical Engineers (ASME) governs the design and construction of power boilers and piping systems in the United States and many other countries. The ASME rules generally cover only the design and construction of these components, whereas rules for maintenance, repair, and life assessment are not addressed. Recently, ASME has been developing guidelines for post-construction activities, including damage assessment and life prediction. The Electric Power Research Institute (EPRI) h...

2010-08-31T23:59:59.000Z

257

Overview: EPRI's Program for Process Industry Energy Efficiency and Environmental Improvement  

E-Print Network (OSTI)

Faced with increased energy and labor costs and the expense of complying with stricter environmental regulations, many U.S industries have been unable to compete effectively with lower-cost foreign imports. As these industries lose market shares and produce fewer goods, they also use less electricity. And, as the industrial load erodes, the industrial customers are then faced with higher electricity costs and become even less competitive than before. The overall result is an insidious downward spiral --one that is now recognized seriously. Electrotechnologies offer a means of breaking this spiral. Electricity is unique in the flexibility and efficiency of its use, and when applied to industrial processes it can improve productivity, quality, and value in ways that are not possible with other energy forms. This overview presents electrotechnologies selected by EPRI to impact energy efficiency and environment relating to process industry.

Amarnath, A.

1994-04-01T23:59:59.000Z

258

EPRI Biomass Interest Group Meeting, November 2003  

Science Conference Proceedings (OSTI)

This report summarizes the winter 2003 meeting of the Biomass Interest Group (BIG). The meeting was held in Chino, California at Inland Empire Utility Agency's (IEAU) office. The meeting featured presentations on the following general topics: • Biomass Cofiring -- Presentations were made on the European experience, with particular emphasis on the United Kingdom, firing biomass/coal pellets at Allegheny Energy's R. Paul Smith station, and firing sawdust at AEP's Picway plant. • Biomass Gasificat...

2004-02-23T23:59:59.000Z

259

Cost-Effectiveness of Energy Storage in California: Application of the EPRI Energy Storage Valuation Tool to Inform the California Public Utility Commission Proceeding R. 10-12-007  

Science Conference Proceedings (OSTI)

EPRI has developed an innovative methodology for quantifying the value of grid energy storage opportunities. The EPRI Energy Storage Valuation Tool (ESVT) — simulation software developed to support this methodology — enables preliminary economic analysis prior to more resource-intensive analytical efforts. This report describes applications of the methodology and tool to analyze a range of energy storage cases, including different uses, technologies, locations, and future electricity ...

2013-06-13T23:59:59.000Z

260

EPRI/NRC-RES Fire Human Reliability Analysis Guidelines  

Science Conference Proceedings (OSTI)

In 2001, EPRI and Nuclear Regulatory Research (RES) collaborated to improve the state of the art in fire risk assessment to support the new risk-informed environment in fire protection. This project produced a consensus documentNUREG/CR-6850 (EPRI report 1011989), Fire PRA Methodology for Nuclear Power Facilitieswhich addresses fire risk during operations at power plants. NUREG/CR-6850 developed high-level guidance on identifying and including human failure events (HFEs) into the fire PRA (FPRA) and a me...

2009-11-30T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

federal agency  

Science Conference Proceedings (OSTI)

Federal Agency Information. ... Information on Biometric Standards. Analysis Model for Selection of Concensus Standards.

2013-07-25T23:59:59.000Z

262

Clearance and Tagging Guideline for Fossil Electric Generating Stations  

Science Conference Proceedings (OSTI)

In their trips to more than a dozen plants in the past three years, Electric Power Research Institute (EPRI) teams observed that clearance and tagging processes have ranged from comprehensive to less than adequate. In plants with detailed procedures and plants with less than adequate procedures, activities have been observed that were not as safe as they should have been. EPRI and fossil generating advisors determined that a clearance and tagging guideline was needed. EPRI and the industry advisors decid...

2008-03-26T23:59:59.000Z

263

User Guide for EPRI API Test Program, Version 2.02.024  

Science Conference Proceedings (OSTI)

The objective of the EPRI Application Program Interface (API) Test Program is to provide software developers with an example, including source code, for understanding how to develop programs that use the EPRI API. The EPRI API is defined so that application program developers can use a single standard API for interfacing to a wide variety of data sources. The EPRI API encompasses operations for Common Data Access including create, read, update, delete and fine grained notification of data changes.

2000-08-14T23:59:59.000Z

264

Proceedings: 1997 EPRI International Low-Level Waste Conference  

Science Conference Proceedings (OSTI)

Due to the changing business environment, U.S. utilities are evaluating methods to improve operations while minimizing costs. EPRI's sixth annual International Low-Level Waste (LLW) Conference featured 55 papers on a variety of topics. The majority of papers presented new or optimized technology and plant enhancements to reduce cost and improve LLW management.

1999-05-27T23:59:59.000Z

265

Proceedings: 1994 EPRI International Low Level Waste Conference  

Science Conference Proceedings (OSTI)

EPRI's third annual International Low Level Waste Conference focused on key economic, regulatory, and technical interests associated with low level waste. Topics discussed included advanced wet waste processing and technology, radwaste cost reduction, storage and disposal issues, mixed waste, advanced ion-exchange technology, decontamination, and source term reduction.

1995-06-14T23:59:59.000Z

266

Proceedings: 3rd EPRI International Decommissioning and Radioactive Waste Workshop  

Science Conference Proceedings (OSTI)

EPRI held its 3rd International Decommissioning Workshop in collaboration with EDF in Lyon, France. This workshop focused on a wide range of decommissioning topics, including general approaches, technical developments and project experiences. The information presented will assist individual utilities in their decommissioning projects with the potential to reduce decommissioning costs.

2005-09-16T23:59:59.000Z

267

EPRI MOV Performance Prediction Program: Friction Separate Effects Test Report  

Science Conference Proceedings (OSTI)

The coefficient of sliding friction between the internal components of a gate valve is an important factor in determining the thrust required to operate the valve. An EPRI test program measured coefficients of friction between typical gate valve internal materials using specimens that duplicated the contact configurations occurring in valves.

1993-12-01T23:59:59.000Z

268

Proceedings: EPRI/NERC Forum on Voltage Stability  

Science Conference Proceedings (OSTI)

As power systems are operated at increased stress, utilities are becoming more concerned about voltage collapse and consequent severe disruptions. This meeting, cosponsored by EPRI and NERC, provided a forum for a group of international experts to exchange information on voltage stability, including its physical understanding, operational practices, and application of available tools.

1993-06-01T23:59:59.000Z

269

EPRI Intelligent Universal Transformer (IUT TM): 2007 Progress Summary  

Science Conference Proceedings (OSTI)

The EPRI Intelligent Universal Transformer (IUT) is in the early stages of development. This device will serve as a multi-function replacement for conventional distribution transformers. The IUT will provide numerous system operating benefits and added functionality compared to conventional transformers. This report presents the project status and results as of the end of 2007.

2007-12-20T23:59:59.000Z

270

Electric Transit Service for the City of Manhattan, Kansas  

Science Conference Proceedings (OSTI)

This report details results of an EPRI-commissioned study from the Santa Barbara Electric Transportation Institute (SBETI) relating to electric transit service for the City of Manhattan, Kansas.

2001-09-13T23:59:59.000Z

271

Increasing Profits with Electric Industrial Vehicles: Alabama Power Company Electric Forklift Incentive Program  

Science Conference Proceedings (OSTI)

Alabama Power Company's Electric Transportation Department has increased its bottom line through an innovative electric forklift incentive program. This presentation outlines the key points of an EPRI Case Study (EPRI report no. 1006013) that documents the utility's strategy, implementation, and results. The presentation demonstrates 1) the value of the industrial electric vehicle market to the utility, and 2) how the industrial market can benefit your bottom line.

2001-08-24T23:59:59.000Z

272

National electrical code changes for 1996 and USA participation in International Energy Agency activities related to photovoltaics safety and grid interconnection  

DOE Green Energy (OSTI)

As photovoltaic (PV) systems gain more acceptance in utility-interactive applications throughout the world, many organizations are placing increasingly higher priorities on writing guidelines, codes and standards. These guidelines and codes are being written to improve safety, installation, acceptance, listing or certification of the PV components or systems. Sandia National Laboratories` PV System Applications Department is working closely with the PV industry to address issues that are associated with fire and personnel safety and with National Electrical Code (NEC) requirements. Additionally, the United States has agreed to participate in two of the International Energy Agency (IEA) Annexes (topical tasks) of the Implementing Agreement for a Cooperative Programme on Photovoltaic Power Systems. This paper describes events and activities associated with the NEC and the IEA that are being led by Sandia National Laboratories with broad participation by the US PV industry.

Bower, W.

1995-01-01T23:59:59.000Z

273

EPRI Cryogenic O&M Workshop: Proceedings  

Science Conference Proceedings (OSTI)

The electric substation of the future will likely incorporate technologies vastly different from those that have been traditionally installed over the last half century. Already, both solid-state switching devices and superconductors are making their debut in transmission and distribution substations. Superconductors promise to revolutionize power delivery. These materials have almost zero resistance to current flow and can carry considerably more current than equivalent wires made of copper or aluminum....

2004-12-27T23:59:59.000Z

274

EPRI Big Data Survey Summary Report  

Science Conference Proceedings (OSTI)

Electric utilities around the world are deploying a wide range of technologies for distribution, transmission and advanced metering systems. These new devices, applications, sensors and monitoring capabilities are geared toward making the grid "smarter" and to support operations, planning and asset management. The ever-increasing amount of data resulting from these new technologies and need for more sophisticated analytics capabilities is presenting new opportunities as well as some ...

2013-12-05T23:59:59.000Z

275

Distribution System Reliability Practices: Noteworthy Practices at Central Hudson Gas & Electric Corporation  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute's (EPRI's) members represent more than 90% of the electricity generated and delivered in the United States, and international participation extends to 40 countries. Participation by such a large cross section of the utility industry provides EPRI with a unique ability to reach out to and learn from a wide variety of utility companies. This level of exposure is a distinct advantage for this type of research, in which EPRI is documenting and sharing noteworthy practice...

2011-11-14T23:59:59.000Z

276

Energy Department - Electric Power Research Institute Cooperation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cooperation to Increase Energy Efficiency March 6, 2008 - 10:52am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI)...

277

Overhead Lineworker Practices: Lincoln Electric System  

Science Conference Proceedings (OSTI)

This report describes the findings of an overhead distribution line worker practices immersion conducted by the Electric Power Research Institute (EPRI) with the Lincoln Electric System (LES). The immersion was conducted as part of a multiyear effort by EPRI to identify noteworthy line worker practices related to the management of overhead distribution systems. More specifically, this report profiles the practices (the people, processes, and technology) in place at LES, a Lincoln, Nebraskabased utility. ...

2011-12-21T23:59:59.000Z

278

23rd EPRI Steam Generator NDE Workshop Proceedings  

Science Conference Proceedings (OSTI)

The 23rd EPRI Steam Generator NDE Workshop took place in Chicago, Illinois, July 12–14, 2004, and was made up of one full day and two half days of presentations. Attendees included representatives from domestic and overseas nuclear utilities, nuclear steam supply system (NSSS) vendors, nondestructive evaluation (NDE) service and equipment organizations, research laboratories, and regulatory bodies. This annual workshop serves as a forum for NDE specialists to gather and discuss current steam genera...

2004-11-08T23:59:59.000Z

279

EPRI EMF Exposure Database: SCE Utility Workers Data Set  

Science Conference Proceedings (OSTI)

Researchers at Southern California Edison Company (SCE) provided exposure data collected during a SCE-sponsored cohort and case- control study of cancer among SCE employees for inclusion in the EPRI EMF Exposure Database. This data set contains five data products related to measurements of magnetic field personal exposure: binary and ASCII time- series files of individual measurements, three summary files with records for each individual activity period, each consolidated activity within a session and ea...

1996-11-09T23:59:59.000Z

280

Proceedings: 1996 EPRI International Low Level Waste Conference  

Science Conference Proceedings (OSTI)

Due to the changing business environment, U.S. utilities are evaluating methods to improve operations while minimizing costs. EPRI's fifth annual International Low Level Waste (LLW) Conference featured 65 papers on a variety of topics. More than a third of the papers emphasized liquid-wet waste processing enhancements, new or improved technologies, and LLW program cost reduction. Other subjects included dry active waste processing cost reduction, the new DOT/NRC transport regulations, mixed waste, vitrif...

1996-12-06T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Dehumidification: A Review of EPRI Activities and Research Results  

Science Conference Proceedings (OSTI)

This is a PDF of PowerPointslides presented during the webcast 147Dehumidification: Review of EPRI Activities and Research Results,conducted on October 6, 2009. The information presented emphasizes how dehumidification technologies affect the energy efficiency of space conditioning in buildings. The topics discussed in the webcast include the following: 149The value of dehumidification in enhancing energy efficiency general cost/benefit analysis review of current and advanced dehumidification technologie...

2009-11-09T23:59:59.000Z

282

Nondestructive Evaluation: EPRI NDE Performance Demonstration Workshop Meeting Notes  

Science Conference Proceedings (OSTI)

The Nondestructive Evaluation: EPRI NDE Performance Demonstration Workshop Meeting Notes contains all of the presentations and technical information presented during the PD Workshop held July 2426, 2006 at Myrtle Beach, South Carolina. The purpose of the workshop was to describe the approaches to NDE Performance Demonstration (PD) taken by each of the major materials Issue Programs (IP), and the status of each programMRP, PDI, SGMP, and BWRVIP and to present various stakeholder perspectives on the topic ...

2006-10-17T23:59:59.000Z

283

Proceedings of the June 2004 EPRI PWR Primary Shutdown Workshop  

Science Conference Proceedings (OSTI)

There have been a number of outages within the last couple of years that were significant enough to warrant review and examination for lessons learned. Industry feedback suggested a workshop be conducted to address these experiences, including issues associated with shorter outage campaigns and the effects of core design changes. Thus, a two day workshop was jointly coordinated by Chemistry and FRP and held on June 9-10, 2004 at the EPRI offices in Charlotte, NC so that lessons learned could potentially ...

2004-08-23T23:59:59.000Z

284

Residential sector end-use forecasting with EPRI-Reeps 2.1: Summary input assumptions and results  

SciTech Connect

This paper describes current and projected future energy use by end-use and fuel for the U.S. residential sector, and assesses which end-uses are growing most rapidly over time. The inputs to this forecast are based on a multi-year data compilation effort funded by the U.S. Department of Energy. We use the Electric Power Research Institute`s (EPRI`s) REEPS model, as reconfigured to reflect the latest end-use technology data. Residential primary energy use is expected to grow 0.3% per year between 1995 and 2010, while electricity demand is projected to grow at about 0.7% per year over this period. The number of households is expected to grow at about 0.8% per year, which implies that the overall primary energy intensity per household of the residential sector is declining, and the electricity intensity per household is remaining roughly constant over the forecast period. These relatively low growth rates are dependent on the assumed growth rate for miscellaneous electricity, which is the single largest contributor to demand growth in many recent forecasts.

Koomey, J.G.; Brown, R.E.; Richey, R. [and others

1995-12-01T23:59:59.000Z

285

State Agencies  

NLE Websites -- All DOE Office Websites (Extended Search)

Agencies Beatrice State Developmental Center, Nebraska Black Hills State University, SD, South Dakota Fergus Falls State Hospital, Minnesota Hastings Regional Center, Nebraska...

286

Power Delivery System and Electricity Markets for the Future  

Science Conference Proceedings (OSTI)

This report is in draft form pending approval by EPRI Power Delivery & Markets Group Council. Upon approval, the report will be reformatted and issued as a final report by October 31, 2003. The Electricity Roadmap Initiative is an ongoing collaborative exploration of the opportunities for electricity-based innovation over the next 20 years and beyond. Thus far, over 150 organizations have participated with EPRI and its members in shaping a comprehensive vision of how to further increase electricity's val...

2003-08-27T23:59:59.000Z

287

Solar Thermal Electric Technology: 2009  

Science Conference Proceedings (OSTI)

This report summarizes the status and progress of the solar thermal and concentrating solar power (CSP) industry in 2009. It addresses relevant policies in the United States and internationally, technology status, trends, companies and organizations involved in the field, and modeling activities supported by the Electric Power Research Institute (EPRI) and the Solar Thermal Electric Project (STEP).

2010-06-23T23:59:59.000Z

288

Plug-in Hybrid Electric Vehicle (PHEV) Prototype Testing and Evaluation -- Data Collection and Analysis  

Science Conference Proceedings (OSTI)

In 2003, EPRI and DaimlerChrysler initiated a collaborative effort to develop and demonstrate a Plug-in Hybrid Electric Vehicle (PHEV) version of DaimlerChrysler's Sprinter commercial van. PHEV Sprinters were subsequently developed and used in limited fleet testing at several locations within the United States. As part of this effort, EPRI took on the responsibility of managing data acquisition and analysis. This report describes the data analysis toolkit EPRI created as part of an ongoing effort to eval...

2008-12-16T23:59:59.000Z

289

Program on Technology Innovation: Development of the EPRI Magnetic Molecules Technology  

Science Conference Proceedings (OSTI)

This report describes work to date on development of EPRI Magnetic Molecules, a new technology for the selective removal of radioactive and other contaminants from liquid wastes and process solutions at nuclear power plants. EPRI received a patent following an initial proof of principle test demonstrating the viability of the concept. This report describes the first phase of the EPRI program to establish this technology.

2007-11-26T23:59:59.000Z

290

Application of the EPRI Standard Radiation Monitoring Program for PWR Radiation Field Reduction  

Science Conference Proceedings (OSTI)

The NEI/INPO/EPRI RP 2020 Initiative was developed to promote radiation dose reduction by emphasizing radiological protection fundamentals and reducing radioactive source term. EPRI was charged as the technical lead in the area of source term reduction. EPRI's Radiation Management program initiated a multi-year program to develop an understanding of source term generation and transport with the eventual goal of providing plant specific recommendations for source term reduction. Reinstatement of the Stand...

2007-11-28T23:59:59.000Z

291

EPRI Yucca Mountain Total System Performance Assessment Code (IMARC) Version 10  

Science Conference Proceedings (OSTI)

Since 1989, EPRI has been conducting independent assessments of the proposed deep geologic repository for the disposal of spent nuclear fuel (SNF) and high level radioactive waste (HLW) at Yucca Mountain, Nevada. EPRI pioneered application of the total system performance assessment (TSPA) approach for evaluating performance of geologic repository systems on a probabilistic basis. Along the way, EPRI developed the Integrated Multiple Assumptions and Release Code (IMARC) as its primary analytical tool for ...

2009-06-30T23:59:59.000Z

292

Texas Plugs In: Houston and San Antonio Residents' Expectations of and Purchase Intentions for Plug-In Electric Vehicles  

Science Conference Proceedings (OSTI)

EPRI’s ongoing PEV survey research is providing a data-driven understanding of electricity customers: knowledge about PEVs, expectations of utilities relative to PEVs, and perceptions of PEVs as an alternative to gasoline-powered vehicles. The survey instrument used to collect this data has been developed in an ongoing collaborative process with Electric Transportation ...

2012-09-14T23:59:59.000Z

293

The ICF, Inc. coal and electric utilities model : an analysis and evaluation  

E-Print Network (OSTI)

v.1. The Electric Power Research Institute (EPRI) is sponsoring a series of evaluations of important energy policy and electric utility industry models by the MIT Energy Model Analysis Program (EMAP). The subject of this ...

Wood, David O.

1981-01-01T23:59:59.000Z

294

EPRI Biomass Interest Group Meeting 3 Results--2005  

Science Conference Proceedings (OSTI)

The EPRI Biomass Interest Group meets three times per year to exchange information on projects, explore new technologies, and to set the research agenda for the group. In 2005, the first meeting was held in March in Washington, DC, the second meeting was a tour of biomass facilities in Europe, and the third meeting was December 6, 2005 in Des Moines, Iowa. This report summarizes the results of that meeting, including a tour of the switchgrass cofiring facility at the nearby Ottumwa Generating Station.

2006-03-21T23:59:59.000Z

295

Proceedings from the 5th International Symposium on Light and Human Health: November 3-5, 2002, Orlando, Florida--EPRI Lighting Rese arch Office  

Science Conference Proceedings (OSTI)

The 5th EPRI/LRO Lighting Research Symposium (November, 2002) was organized to present and examine current research information on the subject of Light and Human Health in response to a growing sense that light -- both electric lighting and daylighting -- impacts human beings well beyond what has been traditionally studied as vision and visual performance. This Final Report of the Symposium is a collection of 23 presented and seven poster papers grouped under the following headings: I – Medical App...

2004-05-12T23:59:59.000Z

296

A Summary of EPRI's Pulverized Coal (PC) and Circulating Fluidized Bed (CFB) Post Combustion CO2 Capture Retrofit Studies: The Five North American Retrofit Cases  

Science Conference Proceedings (OSTI)

This report examines the feasibility of retrofitting post-combustion capture (PCC) technology to existing pulverized coal (PC) and/or circulating fluidized bed (CFB) power plants, for five different host participant sites. The knowledge gained from previous CoalFleet ultra-supercritical PCC design studies—described in the Electric Power Research Institute (EPRI) report An Engineering and Economic Assessment of Post-Combustion CO2 Capture for 1100 F Ultra-Supercritical Pulverized ...

2012-12-31T23:59:59.000Z

297

Water Disclosure in the Electric Power Industry  

Science Conference Proceedings (OSTI)

This topical brief provides an overview of two of the prominent water disclosure mechanisms affecting the electric power industry, the Global Reporting Initiative (GRI) and Carbon Disclosure Project Water Disclosure (CDP Water), and identifies connections to relevant EPRI research. The document was developed through EPRI's Program 55 Strategic Water Issues, and the Energy Sustainability Interest Group. This collaborative interest group was launched in 2008 and is made up of nearly 30 companies representi...

2011-06-17T23:59:59.000Z

298

Electric  

U.S. Energy Information Administration (EIA)

Average Retail Price of Electricity to ... Period Residential Commercial Industrial ... or usage falling within specified limits by rate ...

299

FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, September 26-December 31, 1996  

DOE Green Energy (OSTI)

Biomass utilization to reduce fossil C0{sub 2} emissions is being supported by sixteen (16) EPRI research projects, each contributing to the commercialization of systems to address greenhouse gas emissions. These projects include: (1) cofiring combustion testing at the Seward Generating Station of GPU Genco; (2) fuel preparation testing at the Greenidge Generating Station of NYSEG; (3) precommercial testing of cofiring at the Allen and Colbert Fossil Plants of TVA; (4) testing of switchgrass cofiring at the Blount St. Station of Madison Gas & Electric; (5) high percentage biomass cofiring with Southern Company; (6) urban wood waste cofiring at the supercritical cyclone boiler at Michigan City Generating Station of Northern Indiana Public Service Co. (NIPSCO); (7) evaluation of switchgrass cofiring with Nebraska Public Power District at Sandia National Laboratories in Livermore, CA; (8) waste plastics cofiring with Duke Power in a tangentially-fired pulverized coal (PC) boiler; (9) cofiring a mixture of plastics, fiber, and pulp industry wastes with South Carolina Electric and Gas; (10) urban wood waste cofiring evaluation and testing by the University of Pittsburgh in stoker boilers; (11) assessment of toxic emissions from cofiring of wood and coal; (12) development of fuel and power plant models for analysis and interpretation of cofiring results; (13) analysis of C0{sub 2} utilization in algal systems for wastewater treatment; (14) combustion testing and combustor development focusing on high percentage cofiring; (15) analysis of problems and potential solutions to the sale of flyash from coal- fired boilers practicing cofiring; and (16) analysis of C0{sub 2} capture and disposal systems. EPRI is supported in these efforts by numerous contractors including: Foster Wheeler Environmental Corporation, Battelle Columbus Laboratories, New York State Electric and Gas Co., Tennessee Valley Authority (TVA), NIPSCO, the University of Pittsburgh, John Benneman, and others. These projects address various aspects of cofiring for C0{sub 2} mitigation including testing of cofiring with various fuels, and in all types of boilers; development of analytical tools to support the cofiring assessment; addressing specific barriers to cofiring such as the sale of flyash; longer term technology development; and evaluating alternative methods for C0{sub 2} mitigation. Taken together, they address the critical concerns associated with this approach to biofuel utilization. As such, they support implementation of the most promising near-term approach to biomass usage for greenhouse gas mitigation. This report contains a brief description of each project. It then reports the progress made during the first quarter of the contract, focusing upon test results from the Allen Fossil Plant, where precommercial testing at a cyclone boiler was used to evaluate particle size and NO{sub x} emissions from cofiring.

Hughes, E. Tillman, D.

1997-12-01T23:59:59.000Z

300

FETC/EPRI Biomass Cofiring Cooperative Agreement. Quaterly technical report, January 1-March 30m 1997  

DOE Green Energy (OSTI)

Cofiring is considered to be the most promising near-term approach to fossil C0{sub 2} emissions mitigation through biomass usage. Consequently FETC and EPRI have entered into a cooperative agreement: `Cofiring Biomass and Waste-Derived fuels in Electric Utility Coal- Fired Boilers.` This agreement supports sixteen (16) EPRI research projects, each contributing to the commercialization of systems to address greenhouse gas emissions. These projects include: (1) cofiring combustion testing at the Seward Generating Station of GPU Genco; (2) fuel preparation testing at the Greenidge Generating Station of NYSEG; (3) precommercial testing of cofiring at the Allen and Colbert Fossil Plants of TVA; (4) testing of switchgrass cofiring at the Blount St. Station of Madison Gas & Electric; (5) high percentage biomass cofiring with Southern Company; (6) urban wood waste cofiring at the supercritical cyclone boiler at Michigan City Generating Station of Northern Indiana Public Service Co. (NIPSCO); (7) evaluation of switchgrass cofiring with Nebraska Public Power District at Sandia National Laboratories in Livermore, CA; (8) waste plastics cofiring with Duke Power in a tangentially-fired pulverized coal (PC) boiler; (9) cofiring a mixture of plastics, fiber, and pulp industry wastes with South Carolina Electric and Gas; (10) urban wood waste cofiring evaluation and testing by the University of Pittsburgh in stoker boilers; (11) assessment of toxic emissions from cofiring of wood and coal; (12) development of fuel and power plant models for analysis and interpretation of cofiring results; (13) analysis of C0{sub 2} utilization in algal systems for wastewater treatment; (14) combustion testing and combustor development focusing on high percentage cofiring; (15) analysis of problems and potential solutions to the sale of flyash from coal-fired boilers practicing cofiring; and (16) analysis of C0{sub 2} capture and disposal systems. During the second quarter of this contract, from January 1, 1997 through March 31, 1997, significant progress has been made on these projects. This progress focuses upon analysis of data from the cofiring tests, construction of systems to promote additional cofiring tests, and initiation of tasks evaluating alternatives to cofiring. This report contains a brief description of the progress made during the second quarter of the contract, focusing upon test results from the Seward Generating Station, where parametric testing at a wall-fired PC boiler was used to evaluate cofiring using separate feeding of wood and coal to the energy generation system.

Hughes, E.; Tillman, D.

1997-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Urban Network Practices: Pacific Gas and Electric Company  

Science Conference Proceedings (OSTI)

This report describes the findings of an underground distribution practices immersion conducted by the Electric Power Research Institute (EPRI) with the Pacific Gas and Electric Company (PG&E). This immersion was conducted as part of a multi-year effort by EPRI to identify noteworthy practices in managing urban network systems. More specifically, this report profiles the practices (people, processes, and technology) in place at PG&E, a San Francisco, California-based utility serving customers via seconda...

2011-07-20T23:59:59.000Z

302

EPRI-DOE Conference on Environmentally- Enhanced Hydropower Turbines: Technical Papers  

SciTech Connect

The EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines was a component of a larger project. The goal of the overall project was to conduct the final developmental engineering required to advance the commercialization of the Alden turbine. As part of this effort, the conference provided a venue to disseminate information on the status of the Alden turbine technology as well as the status of other advanced turbines and research on environmentally-friendly hydropower turbines. The conference was also a product of a federal Memorandum of Understanding among DOE, USBR, and USACE to share technical information on hydropower. The conference was held in Washington, DC on May 19 and 20, 2011 and welcomed over 100 attendees. The Conference Organizing Committee included the federal agencies with a vested interest in hydropower in the U.S. The Committee collaboratively assembled this conference, including topics from each facet of the environmentally-friendly conventional hydropower research community. The conference was successful in illustrating the readiness of environmentally-enhanced hydropower technologies. Furthermore, the topics presented illustrated the need for additional deployment and field testing of these technologies in an effort to promote the growth of environmentally sustainable hydropower in the U.S. and around the world

None

2011-12-01T23:59:59.000Z

303

Demonstration of EPRI STEEM Optical Probe for LP Turbine Steam Quality Measurement  

Science Conference Proceedings (OSTI)

EPRI has developed the STEEM system, which contains an optical probe for measurement of saturated steam quality that is deployed at the exhaust of low-pressure (LP) turbines. As part of EPRI's development effort, tests of the probe's performance have been conducted in operating turbines, and the results compared with standard measurements of the steam cycle.

2001-11-07T23:59:59.000Z

304

HERBS 2.0, Hyperlinked EPRI Redbook Software on CD-ROM for Win 2000/XP  

Science Conference Proceedings (OSTI)

This software package, for use in conjunction with EPRI AC Transmission Line Reference Book 200kV and Above, Third Edition (EPRI Product 1011974), contains 50 applets, which are small software programs or stand-alone calculation modules. These applets enable users to make specific calculations for transmission-line design parameters and include associated example and design features.

2006-01-23T23:59:59.000Z

305

Proceedings: 2004 EPRI International Low-Level Waste Conference and Exhibit Show  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and minimize cost. EPRI's thirteenth annual International Low Level Waste (LLW) Conference -- coupled with the 25th annual ASME/EPRI Radwaste Workshop -- offered valuable insights into this effort by presenting papers covering new or improved technology developed worldwide for LLW management, processing, shipment, disposal, and regulation.

2005-06-14T23:59:59.000Z

306

EPRI Power Electronics-Based Transmission Controllers Reference Book ("The Gold Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a first edition of the EPRI Power Electronics-Based Transmission Controllers Reference Book. This report is the most recent draft of a chapter for the "Gold Book," an authoritative guide for utilities and others who install and maintain power electronics equipment to increase power transfer capability.

2009-12-23T23:59:59.000Z

307

Residential Sector End-Use Forecasting with EPRI-REEPS 2.1: Summary Input Assumptions and Results  

E-Print Network (OSTI)

Development of a Residential Forecasting Database. Lawrenceand Methodology for End-Use Forecasting with EPRI-REEPS 2.1.and Methodology for End-Use Forecasting with EPRI-REEPS 2.1.

Koomey, Jonathan G.

2010-01-01T23:59:59.000Z

308

Electricity  

Energy.gov (U.S. Department of Energy (DOE))

Electricity is an essential part of modern life. The Energy Department is working to create technology solutions that will reduce our energy use and save Americans money.

309

State Agency Land Leases Prepared for the  

E-Print Network (OSTI)

State Agency Land Leases Prepared for the U.S. Department of Energy Office of Electricity Delivery as an account of work sponsored by an agency of the United States Government. Neither the United States, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions

310

State Agency Land Leases Prepared for the  

E-Print Network (OSTI)

State Agency Land Leases Prepared for the U.S. Department of Energy Office of Electricity Delivery of the United States Government. Neither the United States Government nor any agency thereof, nor any or any agency thereof. The views and opinions of authors expressed herein do not necessarily state

311

Planning for future uncertainties in electric power generation : an analysis of transitional strategies for reduction of carbon and sulfur emissions  

E-Print Network (OSTI)

The object of this paper is to identify strategies for the U.S. electric utility industry for reduction of both acid rain producing and global warming gases. The research used the EPRI Electric Generation Expansion Analysis ...

Tabors, Richard D.

1991-01-01T23:59:59.000Z

312

Microsoft PowerPoint - anderson_epri.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review Review ETO STATCOM Demonstration Project Update September 30, 2008 Wayne Litzenberger-DesignTech Loren Anderson-BPA Participants * DOE Energy Storage Program * Sandia National Lab * NCSU * EPRI * TVA * BPA * Florida State University-Center for Advanced Power Systems * Tri-State * AES-SeaWest * Commercial Vendor ? CONDON WIND FARM Proposed Host Site Full Scale Demonstration Project * 10 MVA STATCOM with battery storage * Adjacent to Condon Wind Park * Mitsubishi Type 1 induction machines * Poor voltage regulation * Long line with many small customers Proposed 10 MVA ETO STATCOM for Condon Wind Farm 0.6886mH I=1400 A (RMS) with IEEE 519 standards ETO Voltage Source Converter (transformer leakage inductance) I=1400 A (RMS) with IEEE 519 standards 69kv bus Condon Windfarm Problems

313

Review of Experience With the EPRI DFD Process: Decontamination for Decommissioning of Reactor Coolant Systems and Plant Components  

Science Conference Proceedings (OSTI)

This report describes recent experience using the EPRI DFD (decontamination for decommissioning) dilute chemical decontamination process on reactor coolant systems and components. This report updates previous EPRI reports with additional data on materials corrosion and waste management. A wide range of applications show that EPRI DFD is a versatile, cost-effective process for reducing radiation exposures and radioactive waste.

1998-12-31T23:59:59.000Z

314

Hot dry rock geothermal energy for U.S. electric utilities. Draft final report  

DOE Green Energy (OSTI)

In order to bring an electric utility component into the study of hot dry rock geothermal energy called for in the Energy Policy Act of 1992 (EPAct), EPRI organized a one-day conference in Philadelphia on January 14,1993. The conference was planned as the first day of a two-day sequence, by coordinating with the U.S. Geological Survey (USGS) and the U.S. Department of Energy (DOE). These two federal agencies were charged under EPAct with the development of a report on the potential for hot dry rock geothermal energy production in the US, especially the eastern US. The USGS was given lead responsibility for a report to be done in association with DOE. The EPRI conference emphasized first the status of technology development and testing in the U.S. and abroad, i.e., in western Europe, Russia and Japan. The conference went on to address the extent of knowledge regarding the resource base in the US, especially in the eastern half of the country, and then to address some practical business aspects of organizing projects or industries that could bring these resources into use, either for thermal applications or for electric power generation.

Not Available

1993-06-01T23:59:59.000Z

315

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

Electrical effects can constrain the design of prospective high-voltage direct current (HVDC) lines operating either alone or sharing the same rights of way structures with high-voltage alternate current (HVAC) lines. In 2013, the Electric Power Research Institute (EPRI) research on HVDC electrical effects focused on electric field and ion density at ground level. The ultimate goal of the project is to calculate with confidence these electrical effects. The algorithms on which the software currently ...

2013-11-08T23:59:59.000Z

316

Burlington Electric Department - Commercial Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agencies You are here Home Savings Burlington Electric Department - Commercial Energy Efficiency Rebate Program Burlington Electric Department - Commercial Energy...

317

Environmental Assessment of Plug-In Hybrid Electric Vehicles, Volume 1: Nationwide Greenhouse Gas Emissions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment of Plug-In Hybrid Electric Vehicles Volume 1: Nationwide Greenhouse Gas Emissions Environmental Assessment of Plug-In Hybrid Electric Vehicles Volume 1: Nationwide Greenhouse Gas Emissions 1015325 Final Report, July 2007 Each of the ... scenarios showed significant Greenhouse Gas reductions due to PHEV fleet penetration ... ... PHEVs adoption results in significant reduction in the consumption of petroleum fuels. ' ' DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES THIS DOCUMENT WAS PREPARED BY THE ORGANIZATION(S) NAMED BELOW AS AN ACCOUNT OF WORK SPONSORED OR COSPONSORED BY THE ELECTRIC POWER RESEARCH INSTITUTE, INC. (EPRI). NEITHER EPRI, ANY MEMBER OF EPRI, ANY COSPONSOR, THE ORGANIZATION(S) BELOW, NOR ANY PERSON ACTING

318

Measurement of Initial Market Acceptance of Plug-in Electric Vehicles  

Science Conference Proceedings (OSTI)

EPRI has been tracking the evolution of the plug-in electric vehicle (PEV) market, using historic hybrid electric vehicle (HEV) sales for comparison and to provide a context for understanding how a completely novel automotive technology beginning with a limited number of vehicles with small sales can steadily grow to market success. This Technical Update provides background on why EPRI considers hybrid sales a useful context for plug-in electric vehicle sales. It introduces a methodology for ...

2013-12-18T23:59:59.000Z

319

[Agency Name]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 1. Introduction The Department of Energy sees the implementation of the Plain Writing Act as an important initiative that helps the Department share relevant information in a way that is clear, concise, and informative. The areas referenced in this report summarize some of our successes - particularly in providing Plain Language Training to employees and contractors (Part VI) - as we continue to implement the Act. 1. Departmental Plain Writing Officials 2. Ingrid Kolb, Director of the Office of Management, Senior Agency Official Responsible for Plain Writing 3. Michael Coogan, Office of the Executive Secretariat, Plain Language Point-of-Contact 1. Examples of Agency Website Communications Available in a Format Consistent with the Plain Language Guidelines

320

[Agency Name]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plain Writing Compliance Report | page 1 Plain Writing Compliance Report | page 1 I. SENIOR AGENCY OFFICIAL FOR PLAIN WRITING Senior Official for Plain Writing: Ingrid Kolb Director, Office of Management Plain Writing Implementation Contact: Michael Coogan Office of the Executive Secretariat II. TO DATE, DEPARTMENT OF ENERGY (DOE) COMMUNICATIONS RELEASED IN PLAIN LANGUAGE * DOE website overhaul includes a focus on Plain Writing, geared toward the public and DOE employees. * DOE Powerpedia Page (DOE's internal Wikipedia site) shares information - in plain language - with employees and contractors. * All correspondence for Congress, stakeholders, and others that is reviewed by the Office of Executive Secretariat is reviewed for Plain Language. III. INFORM AGENCY STAFF OF PLAIN WRITING ACT'S REQUIREMENTS

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

[Agency Name]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 1. Introduction The Department of Energy sees the implementation of the Plain Writing Act as an important initiative that helps the Department share relevant information in a way that is clear, concise, and informative. The areas referenced in this report are only a few of the successes we have encountered as we continue to implement the Act. 1. Departmental Plain Writing Officials 2. Ingrid Kolb, Director of the Office of Management, Senior Agency Official Responsible for Plain Writing 3. Michael Coogan, Office of the Executive Secretariat, Plain Language Point-of-Contact 1. Examples of Agency Website Communications Available in a Format Consistent with the Plain Language Guidelines 2. Department of Energy. This redesigned website went live on August 4, 2011. The new energy.gov represents a commitment to principles

322

Solar Thermal Electric Technology: 2008  

Science Conference Proceedings (OSTI)

This report summarizes the status and progress of the solar thermal and concentrating solar power (CSP) industry in 2008. It addresses technology status, trends, companies and organizations involved in the field, and modeling activities supported by EPRI and the Solar Thermal Electric Project (STEP).

2009-03-31T23:59:59.000Z

323

Nicole Taheri, Robert Entriken, and IBM, EPRI, and Stanford  

E-Print Network (OSTI)

of Plug-in Electric Vehicles could impact the electricity grid. Standard Charging: as soon as the car Spent Driving Electricity Price Constraint Adjusted Price Total Charge Allowed #12;There are two cars Energy Efficiency Center and Electric Power Research Institute A Dynamic Linear Programming Algorithm

Ye, Yinyu

324

NRC Regulatory Issue Summary on EPRI Digital Licensing Guideline, TR-102348 (NEI 01-01)  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) issued this regulatory issue summary (RIS) to announce that the NRC has reviewed the EPRI / Nuclear Energy Institute (NEI) Joint Task Force Report entitled "Guideline on Licensing Digital Upgrades: EPRI TR-102348, Revision 1, NEI 01-01: A Revision of EPRI TR-102348 To Reflect Changes to the 10 CFR 50.59 Rule," and has endorsed the report for use as guidance in designing and implementing digital upgrades to instrumentation and control systems. The attached safe...

2004-01-16T23:59:59.000Z

325

EPRI geothermal energy R and D 5-year program plan (1975 to 1979)  

DOE Green Energy (OSTI)

The recommended EPRI Geothermal Research and Development 5-Year Program Plan has been defined to complement and provide focus for federally sponsored geothermal energy R and D efforts. The scope of the program includes: verification of hydrothermal reservoir capability and low salinity brine heat transfer characteristics at a potential demonstration site followed by design, development and construction of a low salinity hydrothermal demonstration plant in conjunction with an electric utility or utility consortium. Development of a comprehensive set of Guidelines Manuals for use by utility management and engineers spanning the full range of geothermal resource utilization from exploration through plant startup, including not only technical, but environmental, institutional and regulatory factors. A subprogram to define the potential and requirements for Geothermal Systems. A supporting research and technology subprogram oriented toward minimizing the risk associated with utilization of low and high salinity hydrothermal sources. An Advanced Research and Technology subprogram to assess the potential of geopressure resources in conjunction with the Federal government and limited R and D on advanced concepts for utilization of hydrothermal fluids. (MHR)

Spencer, D.F.

1974-10-17T23:59:59.000Z

326

Power Performance Testing Activities in the DOE-EPRI Turbine Verification Program  

SciTech Connect

As part of the US Department of Energy/Electric Power Research Institute (DOE-EPRI) Wind Turbine Verification Program, Global Energy Concepts (GEC) is engaged in planning and conducting power performance tests for wind turbines in Searsburg, Vermont; Glenmore, Wisconsin; Algona, Iowa; Springview, Nebraska; Kotzebue, Alaska; and Big Spring, Texas. The turbines under investigation include a 550-kW Zond Z-40 FS, a 600-kW Tacke 600e, two 750-kW Zond Z-50s, a 66-kW AOC 15/50, a 660-kW Vestas V-47, and a 1.65-MW Vestas V-66. The testing is performed in a variety of terrain types, including mountains, plains, deserts, and coastal tundra; and under a wide range of atmospheric conditions from arid to arctic. Because one goal of this testing program is to gain experience with the new International Electrotechnical Commission (IEC) 61400-12 standard, all of the measurements are being performed in accordance with this new standard. This paper presents the status of the power performance testing at each site, the methodologies employed, test results available, and lessons learned from the application of the IEC standard. Any sources of uncertainty are discussed, and attention is given to the relative importance of each aspect of the IEC standard in terms of its contribution to the overall measurement uncertainty.

VandenBosche, J.; McCoy, T.; Rhoads, H. (Global Energy Concepts, LLC); McNiff, B. (McNiff Light Industry); Smith, B. (National Renewable Energy Laboratory)

2000-09-11T23:59:59.000Z

327

Comparison of Projections to Actual Performance in the DOE-EPRI Wind Turbine Verification Program  

DOE Green Energy (OSTI)

As part of the US Department of Energy/Electric Power Research Institute (DOE-EPRI) Wind Turbine Verification Program (TVP), Global Energy Concepts (GEC) worked with participating utilities to develop a set of performance projections for their projects based on historical site atmospheric conditions, turbine performance data, operation and maintenance (O and M) strategies, and assumptions about various energy losses. After a preliminary operation period at each project, GEC compared the actual performance to projections and evaluated the accuracy of the data and assumptions that formed the performance projections. This paper presents a comparison of 1999 power output, turbine availability, and other performance characteristics to the projections for TVP projects in Texas, Vermont, Iowa, Nebraska, Wisconsin, and Alaska. Factors that were overestimated or underestimated are quantified. Actual wind speeds are compared to projections based on long-term historical measurements. Turbine power curve measurements are compared with data provided by the manufacturers, and loss assumptions are evaluated for accuracy. Overall, the projects performed well, particularly new commercial turbines in the first few years of operation. However, some sites experienced below average wind resources and greater than expected losses. The TVP project owners successfully developed and constructed wind power plants that are now in full commercial operation, serving a total of approximately 12,000 households.

Rhoads, H.; VandenBosche, J.; McCoy, T.; Compton, A. (Global Energy Concepts, LLC); Smith, B. (National Renewable Energy Laboratory)

2000-09-11T23:59:59.000Z

328

Review of Operation and Maintenance Experience in the DOE-EPRI Wind Turbine Verification Program  

DOE Green Energy (OSTI)

All the projects within the US Department of Energy (DOE) Electrical Power Research Institute (EPRI) Wind Turbine Verification Program (TVP) are now in operation. As a result, the emphasis of the owners and operators has shifted from installation and commissioning to a focus on optimizing the operation and maintenance (O and M) activities of the projects. Each project utilizes a unique strategy for performing O and M. O and M personnel for projects in Searsburg, Vermont; Glenmore, Wisconsin; Algona, Iowa; Springview, Nebraska; Kotzebue, Alaska; and Big Spring, Texas include on-site vendor representatives, dedicated utility personnel, and utility personnel who split their time between the wind turbines and other utility responsibilities. Each project has its own set of priorities for balancing turbine availability against safety, minimizing overtime pay, and other utility responsibilities. Various strategies have also been employed to ensure access to tools and spare parts. This paper compares and contrasts the various O and M strategies at TVP projects and reviews the causes of turbine downtime and the frequency and duration of faults.

Conover, K.; VandenBosche, J.; Rhoads, H. (Global Energy Concepts, LLC); Smith, B. (National Renewable Energy Laboratory)

2000-09-05T23:59:59.000Z

329

Ecosystem Services Decision Tree: A Decision-Support Tool for Consideration of Ecosystem Services in the Electric Power Industry  

Science Conference Proceedings (OSTI)

To support the electric power industry in more structured consideration of ecosystem services, EPRI has developed this “Decision Tree” to determine why, when, and how to consider ecosystem services. EPRI anticipates that this Decision Tree will facilitate more efficient decision-making and action relating to ecosystem services. 

2012-12-31T23:59:59.000Z

330

ELECTRIC  

Office of Legacy Management (LM)

ELECTRIC cdrtrokArJclaeT 3 I+ &i, y I &OF I*- j< t j,fci..- ir )(yiT E-li, ( -,v? Cl -p4.4 RESEARCH LABORATORIES EAST PITTSBURGH, PA. 8ay 22, 1947 Mr. J. Carrel Vrilson...

331

Notes from DOE/EPRI Meeting on Phase II Mercury Field Test Needs  

NLE Websites -- All DOE Office Websites (Extended Search)

Notes Notes DOE/EPRI meeting on Phase II Mercury Field Test Needs Washington DC June 5, 2002 Attendees (phone/e-mail at end of notes) AEP - Gary Spitznogle EPRI - Stu Dalton DOE - Scott Renninger EPRI - George Offen DOE - Tom Feeley GRE - Mark Strohfus Duke - Tim Shawver Southern - Larry Monroe EPA - Jim Kilgroe TVA - Tom Burnett TXU - David Lamb DOE and EPRI jointly convened this meeting to obtain feedback from deeply involved industry members on the needs, scope, schedule, etc. for a second phase of full-scale, longer-term field tests of mercury controls on power plants. The program objectives would be to determine performance and costs of the major near-term control approaches with the hope of using this information both to inform the regulatory (MACT) and legislative (Clear Skies Initiative, CSI) processes as well as industry selections of

332

Proceedings from EPRI's Improve Overall Substations Maintenance (37B) & HVCB Life Management (37F) Task Force  

Science Conference Proceedings (OSTI)

EPRI's Improve Overall Substations Maintenance (37B) and High Voltage Circuit Breaker (HVCB) Life Management (37F) Task Force met December 5, 2007, in San Antonio, Texas. This technical update contains the proceedings of the meeting.

2008-02-04T23:59:59.000Z

333

Proceedings: EPRI Workshop on Improved Operational Flexibility: Making the Most of Generating Assets  

SciTech Connect

EPRI conducted the Workshop on Improved Operational Flexibility in October 2003. This report presents the Proceedings from that workshop. Within the Proceedings, each session is captured with the presenters' presentation slides.

None

2004-07-01T23:59:59.000Z

334

Demonstration of EPRI Heat Rate Guidelines at Southern California Edison Ormond Beach Unit 2  

Science Conference Proceedings (OSTI)

Using EPRI's heat rate improvement guidelines, Southern California Edison Company (SCE) developed a heat rate improvement program and realized significant fuel cost reduction. Other utilities can follow SCE's example to develop their own effective heat rate improvement programs.

1992-10-01T23:59:59.000Z

335

Status Update on the Development of EPRI's Underground Distribution Systems Reference Book  

Science Conference Proceedings (OSTI)

EPRI is sponsoring the development of a first edition of the Underground Distribution Systems Reference Book . The book is scheduled to be published in 2009 and will join the widely used EPRI series of transmission and distribution reference books commonly known by the colors of their covers ("the red book," "the yellow book," and so on). The new reference book will provide a desk and field compendium on the general principles involved in the planning, design, manufacture, installation design, installati...

2008-03-21T23:59:59.000Z

336

EPRI High-Voltage Direct Current (HVDC) Transmission Reference Book: Interim Report  

Science Conference Proceedings (OSTI)

The EPRI High-Voltage Direct Current (HVDC) Transmission Reference Book is a state-of-the-art guidebook that provides transmission companies with a comprehensive, single source of technical information and guidance for designing, building, operating, and extending the life of HVDC transmission systems. The book joins the landmark series of EPRI power delivery reference books. These comprehensive guidebookseach printed with a distinctive colored coverdocument and distill the knowledge and experience of th...

2011-12-30T23:59:59.000Z

337

Proceedings: 2005 EPRI Topical Workshop-Groundwater Contamination Assessment and License Termination Activities  

Science Conference Proceedings (OSTI)

The EPRI Groundwater Workshop focused on the subject of groundwater monitoring related to both operating and decommissioning nuclear plant sites. Groundwater monitoring can have an impact in terms of the time and resources needed to quantify the groundwater contamination and to assure the maintenance of public health and safety. EPRI held this workshop to aid nuclear plant operators in developing robust groundwater monitoring programs. The Workshop presented the latest information on groundwater assessme...

2006-06-01T23:59:59.000Z

338

Proceedings: 2006 EPRI International Low Level Waste Conference and Exhibit Show  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and minimize cost. EPRI's 15th Annual International Low Level Waste (LLW) Conferencecoupled with the 27th Annual ASME/EPRI Radwaste Workshopoffered valuable insight into this effort by presenting papers covering new or improved technology developed worldwide for LLW management, processing, shipment, disposal and regulation. Attendees from several foreign countries, including Korea, the United Kingdom, Canada and Sweden, presented ...

2007-05-15T23:59:59.000Z

339

Program on Technology Innovation: EPRI Framework for Assessment of Nuclear Fuel Cycle Options  

Science Conference Proceedings (OSTI)

EPRI is building a suite of tools for assessing nuclear fuel cycle options based on a platform of software, simplified relationships, and explicit decision-making and evaluation guidelines. This report describes a decision-support framework for assembling and structuring information for transparent auditable assessments as well as knowledge capture and transfer.The EPRI framework comprises evaluation and analysis at strategic, tactical, and readiness levels in regard to transformational ...

2013-03-28T23:59:59.000Z

340

EPRI AC Transmission Line Reference Book-200kV and Above, 2012 Edition  

Science Conference Proceedings (OSTI)

This version of the Redbook is available in PDF only and contains an updated chapter on Right-of-Way management. An older version (#1011974) is available in hardcopy only. You must download Product #1011973 in order to get the companion applets to the report.In 2012, EPRI has undertaken an effort to update this most recent edition of the longtime industry standard EPRI Transmission Line Reference Book, or the “Red Book,” ...

2012-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Status Update on the Development of EPRI's Underground Distribution Systems Reference Book (Bronze Book)  

Science Conference Proceedings (OSTI)

EPRI is developing a first edition of the Underground Distribution Systems Reference Book (Bronze Book), which is scheduled to be published in 2010. This book will join the EPRI series of Transmission and Distribution technical reference books, commonly known by the color of their covers. The book will provide a desk and field compendium on the general principles involved in the planning, design, manufacture, installation design, installation, testing, operation, and maintenance of underground distributi...

2009-05-11T23:59:59.000Z

342

Dissolved Gas Analysis (DGA) by EPRI Disposable Oil Sampling System (EDOSS)  

Science Conference Proceedings (OSTI)

The utility industry has increasingly applied dissolved gas analysis (DGA) to assess the condition of fluid-filled equipment. Modifications to the EPRI Pressurized Oil Sampling System (EPOSS), a novel DGA method developed in 1983, have rendered the system more cost-effective without compromising its accuracy and precision. Designated the EPRI Disposable Oil Sampling System, EDOSS safely operates with all types of fluid-filled equipment under most weather conditions.

1998-10-12T23:59:59.000Z

343

Advanced Nuclear Technology: EPRI Utility Requirements Document (URD) Fukushima Lessons-Learned Treatment  

Science Conference Proceedings (OSTI)

The Fukushima accident of March 2011 resulted in critical lessons learned for both current and future nuclear plants. As part of an ongoing review and update of the EPRI Utility Requirements Document (URD) for New Nuclear Plants, a specific review of Fukushima lessons learned was undertaken.This report provides background information on the process for accomplishing the Fukushima review. It also provides the unique changes that were made to the EPRI URD along with specific linkage back ...

2013-12-13T23:59:59.000Z

344

Proceedings: 2008 EPRI International Low-Level Waste Conference and Exhibit Show  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations, minimize cost and find alternatives for disposal of NRC Class A, B & C waste. EPRI's 17th Annual International Low Level Waste (LLW) Conference - coupled with the 31st Annual ASME/EPRI Radwaste Workshop - offered valuable insights into this effort by presenting papers covering new or improved technology developed worldwide for LLW management, processing, shipment, disposal and regulation. Attendees from several foreign countries ...

2008-11-18T23:59:59.000Z

345

EPRI Power Electronics-Based Transmission Controllers Reference Book ("The Gold Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a first edition of the EPRI Power Electronics-Based Transmission Controllers Reference Book. The reference book will provide a broad overview on power electronics-based controllers0150with information on historical perspectives, basic design considerations, factory testing, site installations, commissioning, operating performance, operation and maintenance, and future trends. The book will assist users in planning, developing, installing, and utilizing this technology.

2006-12-05T23:59:59.000Z

346

EPRI AC Transmission Line Reference Book-200kV and Above, 2013 Edition  

Science Conference Proceedings (OSTI)

In 2012, EPRI started undertaking an effort to update the most recent edition of the longtime industry standard EPRI Transmission Line Reference Book, or the “Red Book,” which was last published in 2005. The 2012 edition included a new and significantly expanded version of Chapter 12, “Shared Use of the Right-of-Way.” Following that initial revised edition, additional updates have been planned, with other chapters being revised and expanded.  In 2013, Chapter 2 ...

2013-12-27T23:59:59.000Z

347

ELECTRIC  

Office of Legacy Management (LM)

ELECTRIC ELECTRIC cdrtrokArJclaeT 3 I+ &i, y$ \I &OF I*- j< t j,fci..- ir )(yiT !E-li, ( \-,v? Cl -p/4.4 RESEARCH LABORATORIES EAST PITTSBURGH, PA. 8ay 22, 1947 Mr. J. Carrel Vrilson General ?!!mager Atomic Qxzgy Commission 1901 Constitution Avenue Kashington, D. C. Dear Sir: In the course of OUT nuclenr research we are planning to study the enc:ri;y threshold anti cross section for fission. For thib program we require a s<>piAroted sample of metallic Uranium 258 of high purity. A quantity of at lezst 5 grams would probably be sufficient for our purpose, and this was included in our 3@icntion for license to the Atonic Energy Coskqission.. This license has been approved, 2nd rre would Llp!Jreciate informztion as to how to ?r*oceed to obtain thit: m2teria.l.

348

March 2009 Union for the Co-ordination of Transmission of Electricity CIM Interoperability Test  

Science Conference Proceedings (OSTI)

The Union for the Co-ordination of Transmission of Electricity (UCTE) and the Electric Power Research Institute (EPRI), along with European and American vendors and transmission system operators (TSOs), conducted one of the largest Common Information Model (CIM) interoperability (IOP) tests to date. The test, held March 23-27, 2009, in Paris, was organized by UCTE, directed by EPRI, and hosted by RTE (a TSO of France). This report describes the results of this testing, which is considered an important st...

2009-06-09T23:59:59.000Z

349

Technology Assessment of Li-Ion Energy Storage Technology for Stationary Electric Utility Applications  

Science Conference Proceedings (OSTI)

Emerging Lithium-ion (Li-ion) energy storage technology, which is being developed and applied in the transportation sector, could have a profound impact in the electric sector by serving applications for distributed energy storage (DES). An earlier EPRI Report, Technology Review and Assessment of Distributed Energy Resources: Distributed Energy Storage (1012983, February 2006), identified Li-ion batteries as a potential disruptive technology for the electric power sector. EPRI undertook this project to a...

2008-03-13T23:59:59.000Z

350

American Electric Power (AEP) Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the American Electric Power (AEP) Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and di...

2009-09-16T23:59:59.000Z

351

A Plug-In Electric Vehicle Simulator for Electric Vehicles Supply Equipment Evaluation  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) is developing a portable plug-in electric vehicle simulator to support laboratory testing and evaluation of electric vehicle supply equipment. The device implements the signaling required in the Society of Automotive Engineers J1772 Recommended Practice, SAE Electric Vehicle Conductive Charge Coupler, and provides connection of power quality monitoring and simulated load equipment. The complete unit is self contained and battery powered for ease of field use, ...

2010-12-22T23:59:59.000Z

352

EPRI Comments on a French Study of Residential Proximity to High-Voltage Power Lines and Childhood Leukemia  

Science Conference Proceedings (OSTI)

Results of a French case-control epidemiologic study of residential proximity to high-voltage power lines and risk of childhood acute leukemia were published in the British Journal of Cancer.  The EPRI Comments provides background information on the study, summarizes the main results and discusses the study’s strength and limitations. The EPRI Comments also highlights an ongoing EPRI-funded epidemiologic study in California that is expected to provide further insight ...

2013-04-23T23:59:59.000Z

353

Program on Technology Innovation: EPRI Yucca Mountain Total System Performance Assessment Code (IMARC) Version 8: Model Description  

Science Conference Proceedings (OSTI)

EPRI has been conducting independent assessments of the total system performance of the candidate spent nuclear fuel and high level radioactive waste (HLW) repository at Yucca Mountain, Nevada, since 1989. EPRI's total system performance assessment (TSPA) code is formally known as IMARC, or Integrated Multiple Assumptions and Release Code. Descriptions of the current version of IMARC are found in numerous EPRI reports. The purpose of this report is to provide a succinct summary of all components of IMARC...

2005-05-30T23:59:59.000Z

354

International Review Team Report: A Peer Review of the Yucca Mountain IMARC Total System Performance Assessment EPRI Model  

Science Conference Proceedings (OSTI)

Since 1989, EPRI has been conducting independent assessments of the proposed deep geologic repository for the disposal of spent nuclear fuel and high level radioactive waste at Yucca Mountain, Nevada. EPRI pioneered application of the total system performance assessment (TSPA) approach for evaluating performance of geologic repository systems on a probabilistic basis. Along the way, EPRI developed the Integrated Multiple Assumptions and Release Code (IMARC) as its primary analytical tool for TSPA-based e...

2009-04-22T23:59:59.000Z

355

A REVIEW OF ASSUMPTIONS AND ANALYSIS IN EPRI EA-3409, "HOUSEHOLD APPLIANCE CHOICE: REVISION OF REEPS BEHAVIORAL MODELS"  

E-Print Network (OSTI)

EPRI EA-3409, "Household Appliance Choice: Revision of REEPSEA",3409: "HOUSEHOLD APPLIANCE CHOICE: REVISION OF REEPSreport EA-3409, "Household Appliance Choice: Revi- sion of

Wood, D.J.

2010-01-01T23:59:59.000Z

356

2010 EPRI-Southern Company Services Fabric Filter Workshop Proceedings  

Science Conference Proceedings (OSTI)

The use of fabric filters (also called baghouses) on coal-fired boilers in power plants has increased significantly in the past several years due to increasingly stringent particulate matter emissions limits. These limits have become even more challenging in light of the proposed maximum achievable control technology (MACT) ruling for air toxics by the U.S. Environmental Protection Agency on March 16, 2011. The proposed MACT ruling will require control of both filterable and condensable particulate matte...

2011-04-28T23:59:59.000Z

357

Electric Transportation Technology Update Newsletter, September 2013  

Science Conference Proceedings (OSTI)

Welcome to Electric Transportation's first Technology Update Newsletter. The purpose of this newsletter is to provide high level information on EPRI research, highlight member projects, and discuss other relevant topics of interest in electric transportation. This first newsletter focuses on plug-in electric vehicle (PEV) infrastructure, including interoperability for networked charging equipment, a status update on DC fast charging protocols, GIS modeling for statewide infrastructure deployment, and the ..

2013-10-18T23:59:59.000Z

358

Fossil Power Plant Applications of Expert Systems: An EPRI Perspective  

E-Print Network (OSTI)

During the past decade, the field of artificial intelligence (AI) has witnessed tremendous growth. In particular, knowledge-based expert systems have quickly come to fore as one of the fastest growing subfields of AI. In this presentation we discuss the role of expert systems in the electric power industry, with particular emphasis on six fossil power plant applications currently under development by the Electric Power Research Institute.

Divakaruni, S. M.

1989-09-01T23:59:59.000Z

359

Memorandum of Understanding Regarding Coordination in Federal Agency Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regarding Coordination in Federal Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land. The MOU will improve uniformity, consistency, and transparency by describing each entity's role and responsibilities when project applicants wish to build electric transmission facilities.

360

Solar Thermal Electric Technology in 2004  

Science Conference Proceedings (OSTI)

This report summarizes progress in the solar thermal electric (STE) industry during 2004. It addresses noteworthy policy decisions, economic considerations, and technological advances. It also provides a status report for selected key demonstrations, as well as analysis and context from EPRI experts and consultants.

2005-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EPRI/C-E PWR Safety Valve Test Report, Volume 10: Piping Structural Response Results  

Science Conference Proceedings (OSTI)

EPRI at the request of the PWR Utilities developed an overall program for the testing of PWR primary system safety and relief valves. This program was in response to NUREG 0578 Item 2.1.2 and NUREG 0737 Item II.D.l.A requirements.This report documents the results of safety valve testing performed as part of the overall program at the EPRI/C-E Valve Test Facility located at Combustion Engineering's Kreisinger Development Laboratory, Windsor, Connecticut. Seven safety valves ...

1983-04-01T23:59:59.000Z

362

FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, July 1-September 30, 1997  

DOE Green Energy (OSTI)

The FETC/EPRI Biomass Cofiring Program has completed one year of activity, accelerating the pace of cofiring development. Cofiring tests were completed at the Seward Generating Station of GPU Genco and at the Michigan City Generating Station of NIPSCO. The NYSEG work at Greenidge Station resulted in a workable, low cost method for injecting biofuels into coal-fired PC boilers. Support studies and modeling continued to provide analytics for the cofiring program. This report summarizes the activities during the fourth quarter of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon the results of testing in order to highlight the progress at utilities.

Hughes, E.; Tillman, D.

1997-12-01T23:59:59.000Z

363

(INCLUDING ANY CONSEQUENTIAL DAMAGES, EVEN IF EPRI OR ANY EPRI REPRESENTATIVE HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES) RESULTING FROM YOUR  

E-Print Network (OSTI)

with Section 734.3(b)(3) and published in accordance with Section 734.7 of the U.S. Export Administration Regulations. As a result of this publication, this report is subject to only copyright protection and does not require any license agreement from EPRI. This notice supersedes the export control restrictions and any proprietary licensed material notices embedded in the document prior to publication. Graphite Decommissioning

C. Wood; Bradtec Decon Technologies

2006-01-01T23:59:59.000Z

364

State Agency Loan Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Loan Program State Agency Loan Program State Agency Loan Program < Back Eligibility State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Construction Appliances & Electronics Commercial Lighting Lighting Home Weatherization Commercial Weatherization Solar Windows, Doors, & Skylights Buying & Making Electricity Swimming Pool Heaters Water Heating Wind Program Info Funding Source Oil Overcharge Restitution Trust funds, RGGI, ARRA State Maryland Program Type State Loan Program Rebate Amount Varies, typical loans from $50,000 - $250,000 Provider Maryland Energy Administration The State Agency Loan Program (SALP) was established in 1991 using funds from the Energy Overcharge Restitution Fund. Through this revolving loan

365

Participating in the U.S. Department of Energy Revised "1605(b)" Program for the Voluntary Reporting of Greenhouse Gas Emissions: A Guide for U.S. Electric Companies  

Science Conference Proceedings (OSTI)

EPRI prepared this Technical Update report to provide staff of EPRI member electric companies and other interested parties a better understanding of the new requirements and methodologies embodied in the revised 1605(b) program guidelines and insight into some of the potential strategic benefits and risks associated with participating in the revised program in the future.

2007-11-29T23:59:59.000Z

366

Electric G-Van demonstration and commercial assessment project  

DOE Green Energy (OSTI)

The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

Braga, B.D. (Electric Power Research Inst., Palo Alto, CA (United States))

1992-12-01T23:59:59.000Z

367

EPRI Freezing Rain Ice Mapping Project: Region 4  

Science Conference Proceedings (OSTI)

To ensure reliable electric service, accurate predictions of ice loads are needed for the design and evaluation of new and existing transmission lines. This report presents ice load maps for the states of North and South Dakota and documents the methodology used to generate them.

1997-12-19T23:59:59.000Z

368

E2I EPRI Assessment Offshore Wave Energy Conversion Devices  

E-Print Network (OSTI)

of offshore wave power to provide efficient, reliable, cost-effective, and environmentally friendly electrical definition study in CY 2004. This study will produce system designs for wave energy conversion device power plants, performance estimate and economic assessments for one site ­ wave energy conversion device per

369

Proceedings: 2009 ISOE North American ALARA Symposium / EPRI Radiation Protection Conference  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and minimize personnel exposure. The 2009 ISOE North American ALARA Symposium/EPRI Radiation Protection Conference offered valuable insights into this effort by presenting papers covering new or improved ALARA technologies and experiences developed worldwide for personnel exposure management, radiation source term reduction, and regulation.

2009-05-15T23:59:59.000Z

370

Verification of EPRI's Nuclear Power Plant Emergency Operating Procedure Tracking System (EOPTS)  

Science Conference Proceedings (OSTI)

EPRI's emergency operating procedure tracking system (EOPTS) for BWRs was created to reduce reactor operator load and human error under nuclear power plant emergency conditions. This report describes a method for systematically verifying EOPTS. This method can help other utilities in verifying their EOPTS.

1992-10-01T23:59:59.000Z

371

Second Annual EPRI Power Delivery Asset Management Conference: Decision Support Methods and Information Technology  

Science Conference Proceedings (OSTI)

Today's utility managers face a corresponding array of conflicting business objectives. In response, many utilities are considering implementing asset management concepts. The Second Annual EPRI Power Delivery Asset Management Conference highlighted the work of researchers, consultants, software providers, and utilities in identifying and overcoming the challenges faced in implementing asset management programs for transmission, distribution, and independent system operator (ISO) business segments of pow...

2004-12-13T23:59:59.000Z

372

Fracture Toughness Characterization of Japanese Reactor Pressure Vessel Steels: Joint EPRI-CRIEPI RPV Embrittlement Studies  

Science Conference Proceedings (OSTI)

EPRI has examined five Japanese reactor pressure vessel steels to characterize the material properties over a complete temperature range, including the brittle/ductile transition region and the upper shelf typical of normal operation. The test results provide the unirradiated baseline needed for evaluating the effects of radiation embrittlement.

1993-07-01T23:59:59.000Z

373

Application of EPRI's Transmission Services Costing Framework to the Development of Open Access Transmission Tariffs  

Science Conference Proceedings (OSTI)

Public utilities in the United States are expected to provide transmission services and ancillary services to eligible customers. This report documents how Centerior Energy Corporation developed a network integration transmission service tariff, a point-to-point transmission service tariff, and four ancillary services tariffs by applying EPRI's Transmission Services Costing Framework.

1996-03-09T23:59:59.000Z

374

EPRI Comments on Swedish Study of PCB Accumulation Beneath AC Power Lines  

Science Conference Proceedings (OSTI)

A paper entitled, "Increased deposition of polychlorinated biphenyls (PCBs) under an AC high-voltage power line," was recently published in Atmospheric Environment (2009;43:6168-6174). These EPRI Comments evaluate the strengths and limitations of the study and provide perspective in the context of results from previous studies.

2010-02-05T23:59:59.000Z

375

Proceedings: EPRI/NEI Decommissioning Workshop: San Antonio, Texas, December 10-12, 1997  

Science Conference Proceedings (OSTI)

EPRI and NEI are actively engaged in providing technical support to utilities planning or involved in nuclear plant decommissioning projects. The first joint Nuclear Decommissioning Workshop provided a forum for utility representatives and selected vendors to exchange information related to decommissioning of nuclear power plants. The workshop focused on the utility experience related to major projects currently under way, technology developments and regulatory issues.

1998-02-28T23:59:59.000Z

376

EPRI Power Flow to CIM Interface: Development of Power Flow to Common Information Model (CIM) Converter  

Science Conference Proceedings (OSTI)

IEEE has developed a Power Systems Application Data Dictionary (PSADD) for power system data and EPRI sponsored development of a CONVERTER program to convert PTI's PSS/E's data into this format. This project will develop the common data sources (CDSs) that translate the PSADD data to/from a Common Information Model (CIM)-structured database.

2002-11-27T23:59:59.000Z

377

Proceedings: 2006 EPRI Radiation Protection Conference/ISOE North American ALARA Symposium  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and minimize personnel exposure. The 2006 EPRI Radiation Protection Conference/ISOE North American ALARA Symposium offered valuable insights into this effort by presenting papers covering new or improved ALARA technologies and experiences developed worldwide for personnel exposure management, radiation source term reduction, and regulation.

2006-10-02T23:59:59.000Z

378

EPRI HVDC Reference Book: Chapter 13 - DC Transmission with Voltage Sourced Converters  

Science Conference Proceedings (OSTI)

DC Transmission with voltage sourced converters (VSC) is a relatively new development in DC transmission. This report covers circuits, theory and capabilities of this new development in HVDC transmission. The report will be a Chapter in the comprehensive HVDC reference guide that EPRI is preparing.

2009-12-21T23:59:59.000Z

379

Proceedings: 4th EPRI International Decommissioning and Radioactive Waste Workshop, Madrid, Spain  

Science Conference Proceedings (OSTI)

EPRI held its 4th International Decommissioning Workshop in collaboration with ENRESA and Union Fenosa in Madrid, Spain. This workshop focused on a wide range of decommissioning topics, including general approaches, technical developments, and project experiences. The information presented will assist individual utilities in their planning and conduct of decommissioning projects with the potential to reduce decommissioning costs.

2006-06-12T23:59:59.000Z

380

Decommissioning Regulatory Process Interactions in 2000: EPRI Support to NEI for NRC Proposed Decommissioning Rule Revision  

Science Conference Proceedings (OSTI)

This report describes the technical support EPRI provided to the Nuclear Energy Institute (NEI) Decommissioning Working Group in 2000. It includes the material supplied to the NEI for their use in generating comments on behalf of the nuclear energy industry concerning the Nuclear Regulatory Commission's (NRC) new draft regulations on decommissioning.

2000-11-03T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Proceedings: 2008 ISOE International ALARA Symposium/EPRI Radiation Protection Conference  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and minimize personnel exposure. The 2008 ISOE North American ALARA Symposium/EPRI Radiation Protection Conference offered valuable insights into this effort by presenting papers covering new or improved ALARA technologies and experiences developed worldwide for personnel exposure management, radiation source term reduction, and regulation.

2008-09-19T23:59:59.000Z

382

Nondestructive Evaluation: 10th EPRI Balance-of-Plant Heat Exchanger NDE Symposium Proceedings  

Science Conference Proceedings (OSTI)

EPRI's 10th Balance-of-Plant Heat Exchanger NDE Symposiumheld in San Antonio, Texas, June 1618, 2008focused on lessons learned and experiences related to inspection, repair, and condition assessment of balance-of-plant (BOP) heat exchangers. This year's symposium scope has extended to non-heat exchanger BOP components, such as buried piping and storage tanks.

2008-08-27T23:59:59.000Z

383

Proceedings: 1998 EPRI/NEI Decommissioning Technology Workshop: Monterey, California, December 7-9, 1998  

Science Conference Proceedings (OSTI)

EPRI and NEI provide technical and regulatory support to utilities planning or involved in nuclear plant decommissioning projects. The second joint Decommissioning Technology Workshop provided the opportunity for utility representatives and selected vendors to exchange information related to nuclear plant decommissioning projects. The workshop focused on recent utility decommissioning experience, technological developments and regulatory updates.

1999-02-08T23:59:59.000Z

384

EPRI Nondestructive Evaluation Center, Assessment of the Intergranular Stress Corrosion Cracking Training and Qualification Program  

Science Conference Proceedings (OSTI)

Independent, periodic evaluations of training programs at the EPRI Nondestructive Evaluation Center ensure fulfillment of utility needs and regulatory requirements for qualified personnel. A recent assessment recommended lengthening trainee time spent in hands-on practice with flawed BWR pipe samples.

1988-03-04T23:59:59.000Z

385

Proceedings: 2011 ISOE North American ALARA Symposium/EPRI Radiation Protection Conference  

Science Conference Proceedings (OSTI)

Nuclear utilities are continually evaluating methods to improve operations and minimize personnel exposure. The 2011 ISOE North American ALARA Symposium/EPRI Radiation Protection Conference offered valuable insights into this effort by presenting papers covering new or improved ALARA (As Low As Reasonably Achievable) technologies and experiences developed worldwide for personnel exposure management, radiation source term reduction, and regulation.

2011-12-06T23:59:59.000Z

386

Joint EPRI-CEA Research on Small Punch Testing for Nuclear Application  

Science Conference Proceedings (OSTI)

A joint research project between EPRI and the Commissariat a l'Energie Atomique (CEA) has been under way since 1998 to compare the fracture behavior of reactor pressure vessel (RPV) materials in the transition region as tested by a subsize impact test (Charpy) and subsize specimen techniques. This report summarizes the progress made under this joint effort.

2001-12-13T23:59:59.000Z

387

PRE-SW EPRI Overhead Transmission Line Inspection - Online Training (OTLOT) Version 9.0, Beta  

Science Conference Proceedings (OSTI)

The EPRI Overhead Transmission Line Inspection - Online Training is a CD-based application for training on how to complete overhead transmission line inspections.It contains fourteen modules of instruction on overhead transmission line inspections. A browser interface helps the user navigate through the interactive training. As the user moves through the module, it provides instruction, application practice, and review questions.    Benefits ...

2013-08-25T23:59:59.000Z

388

Field Demonstration of the EPRI Resin Tester: Prototype Development and Initial Field Usage  

Science Conference Proceedings (OSTI)

This report presents an update on development of the EPRI Resin Tester, a device designed to assess ion exchange resin kinetics and for other resin testing procedures. The report includes information on fabrication and initial operational testing of the first working prototype of the tester device.

2004-12-21T23:59:59.000Z

389

Appendices — Understanding Electric Utility Customers  

Science Conference Proceedings (OSTI)

EPRI report 1023562 provides a synthesis of the body of evidence regarding the major factors that affect how customers value and use electricity; this companion report contains five appendices to support that document. Appendix A provides additional background on price elasticity of demand as a companion to the economics of demand discussion in Section 2 of 1023562. Appendix B provides tables detailing elements of the experimental designs for the 10 pricing pilots examined in Section 3 of 1023562; Append...

2012-02-07T23:59:59.000Z

390

Electricity Energy Storage Technology Options  

Science Conference Proceedings (OSTI)

A confluence of industry drivers8212including increased deployment of renewable generation, the high capital cost of managing grid peak demands, and large capital investments in grid infrastructure for reliability8212is creating new interest in electric energy storage systems. New EPRI research offers a current snapshot of the storage landscape and an analytical framework for estimating the benefits of applications and life-cycle costs of energy storage systems. This paper describes in detail 10 key appl...

2010-12-23T23:59:59.000Z

391

Understanding Energy Customers' Profitability: EPRI's Customer Portfolio Management System  

Science Conference Proceedings (OSTI)

Anticipating pressure on revenues and earnings as deregulation of electricity markets proceeds, a number of utilities have taken some very high visibility initiatives to strengthen earnings and bolster revenues. As the results of such actions begin to be recognized as indeterminate at best, and as the onset of customer choice has proven that most customers will choose not to leave "their utility" company, perhaps the time has come to refocus industry attention on growing and maximizing the value of the r...

2000-09-27T23:59:59.000Z

392

Proceedings of the USNRC/EPRI/ANL Heated Crevice Seminar  

Science Conference Proceedings (OSTI)

An international Heated Crevice Seminar, sponsored by the Division of Engineering Technology, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Argonne National Laboratory, and the Electric Power Research Institute, was held at Argonne National Laboratory on October 7–11, 2002. The objective of the seminar was to provide a working forum for the exchange of information by contributing experts on current issues related to corrosion in heated crevices, particularly as it relat...

2004-06-23T23:59:59.000Z

393

Program on Technology Innovation: Response to the Center for Nuclear Waste Regulatory Analyses Review of EPRI Reports on Igneous Pro cesses at Yucca Mountain  

Science Conference Proceedings (OSTI)

EPRI's 2004 and 2005 technical reports (1008169 and 1011165) describe what might occur in the unlikely event of extrusive or intrusive igneous events at Yucca Mountain repository. The Center for Nuclear Waste Regulatory Analyses (CNWRA) reviewed these two reports in 2007. EPRI has evaluated this review; this report discusses and clarifies several salient points that EPRI believes were misinterpreted in the CNWRA review.

2007-09-27T23:59:59.000Z

394

Impacts of Electric Industry Restructuring on Electric Generation and Fuel Markets: Analytical and Business Challenges  

Science Conference Proceedings (OSTI)

Restructuring and increasing competition are likely to have a major impact on electric generating companies and the individuals and organizations that buy, transport, market, or supply fuels. Restructuring may also affect the patterns of coal and gas use. This report, the first in a series by EPRI and the Gas Research Institute (GRI), describes the scope of these potential impacts.

1997-03-27T23:59:59.000Z

395

Property Damage Risk Assessment Scoping Study: for South Texas Project Electric Generating Station  

Science Conference Proceedings (OSTI)

At the request of the South Texas Project Electric Generating Station (STPEGS), EPRI assessed the financial risks of on-site property damage from component failures and accidents and the effectiveness of available insurance in mitigating such risks. This report quantifies the risks of nuclear and nonnuclear accidents and the resulting property damage incurred. The report is a companion document to EPRI's Nuclear Property Insurance Study (TR-108061), which discusses five options for alternate insurance co...

1997-08-12T23:59:59.000Z

396

Plug-In Electric Vehicle Adoption and Load Forecasting  

Science Conference Proceedings (OSTI)

This report provides a status update on the Electric Power Research Institute’s (EPRI’s) ongoing research into the market adoption of plug-in electric vehicles (PEVs). The PEV market currently includes 13 passenger vehicle models, with 5 more expected by the end of 2013. More than 58,000 PEVs were sold during the 23 months since vehicles became available from major manufacturers, and cumulative sales are expected to surpass 500,000 vehicles by 2015.To help utility planners ...

2012-12-31T23:59:59.000Z

397

Residential Sector End-Use Forecasting with EPRI-REEPS 2.1: Summary Input Assumptions and Results  

E-Print Network (OSTI)

Description Prices for oil, gas, electricity, liquidElectric Electric Electric Gas Oil Electric ElectricElectric Gas Electric Gas Oil Electric Electric Gas Oil

Koomey, Jonathan G.

2010-01-01T23:59:59.000Z

398

Butler Rural Electric Cooperative - Geothermal Rebate Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Butler Rural Electric Cooperative - Geothermal Rebate Program Butler Rural Electric Cooperative - Geothermal Rebate Program...

399

Mohave Electric Cooperative - Renewable Energy Incentive Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Mohave Electric Cooperative - Renewable Energy Incentive Program Mohave Electric Cooperative - Renewable Energy Incentive Program...

400

Cost Effectiveness of Cleaning Techniques for Controlling Human-based Transport of Invasive Exotic Plants on Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

This Technical Update provides a broad overview of accomplishments over the first full year of the Electric Power Research Institute (EPRI) project to investigate the cost effectiveness of cleaning techniques to control human-based transport of invasive exotic plants on electric transmission line rights-of-way. One-half of the intended field work for the whole project (2012-2015) was completed, with attendant greenhouse and office work ongoing. EPRI expects the project to be completed in ...

2013-11-21T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Gas Explosion Tests on Pacific Gas and Electric Company Round Manhole Covers with the Swiveloc CPR-II - Controlled Pressure Release Manhole Cover Restraint System  

Science Conference Proceedings (OSTI)

This report presents findings from the continuing research and development effort to manage and mitigate the effects of underground distribution manhole events. Pacific Gas and Electric (PG&E) approached the Electric Power Research Institute (EPRI) to investigate the performance of several manhole covers, including the native PG&E solid and vented covers and new covers built by Swiveloc, LLC and designated as CPR-II. The tests were conducted at the EPRI-Lenox manhole research facility in Lenox, Massachus...

2010-03-30T23:59:59.000Z

402

Federal Agency NEPA Procedures  

Energy.gov (U.S. Department of Energy (DOE))

Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

403

Sensor Technologies for a Smart Transmission System An EPRI White Paper  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sensor Technologies for a Smart Transmission System Sensor Technologies for a Smart Transmission System An EPRI White Paper December 2009 December 2009 Page 2 An EPRI White Paper Sensor Technologies for a Smart Transmission System Aging equipment and tight O&M budgets are putting the squeeze on transmission line and substation managers. A new gen- eration of low-cost sensors can help diag- nose equipment health to optimize mainte- nance and prevent catastrophic failures. Power delivery systems are among the largest and most diverse, remotely located investments. There are a num- ber of challenges that utilities face with their transmis- sion line and substation assets: * Existing transmission lines and substations are aging while the required reliability is increasing and the availability of clearance to perform maintenance is

404

FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, April 1-June 30, 1997  

DOE Green Energy (OSTI)

The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Among these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.

Hughes, E.; Tillman, D.

1997-12-01T23:59:59.000Z

405

Residential HVAC Data, Assumptions and Methodology for End-Use Forecasting with EPRI-REEPS 2.1  

E-Print Network (OSTI)

Efficiency Choice 6.3 New Home HVAC System Choice 6.4. NewJuly. EPRI. 1990. REEPS 2.0 HVAC Model Logic, prepared by1990. Review of Equipment HVAC Choice Parameters. Cambridge

Johnson, F.X.

2010-01-01T23:59:59.000Z

406

Energy Department - Electric Power Research Institute Cooperation to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department - Electric Power Research Institute Cooperation Energy Department - Electric Power Research Institute Cooperation to Increase Energy Efficiency Energy Department - Electric Power Research Institute Cooperation to Increase Energy Efficiency March 6, 2008 - 11:52am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI) strengthened cooperation for research, development and deployment of energy technologies aimed at promoting increased energy efficiency. DOE and EPRI yesterday signed a Memorandum of Understanding (MOU) establishing a framework for close coordination to advance the common goal of satisfying the nation's growing electricity needs by improving energy efficiency and promoting the widespread adoption of electric energy demand response programs in an effort to curtail energy

407

Energy Department - Electric Power Research Institute Cooperation to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department - Electric Power Research Institute Cooperation Energy Department - Electric Power Research Institute Cooperation to Increase Energy Efficiency Energy Department - Electric Power Research Institute Cooperation to Increase Energy Efficiency March 6, 2008 - 10:52am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI) strengthened cooperation for research, development and deployment of energy technologies aimed at promoting increased energy efficiency. DOE and EPRI yesterday signed a Memorandum of Understanding (MOU) establishing a framework for close coordination to advance the common goal of satisfying the nation's growing electricity needs by improving energy efficiency and promoting the widespread adoption of electric energy demand response programs in an effort to curtail energy

408

Electric Power Research Institute Cooperation to Increase Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Power Research Institute Cooperation to Increase Energy Electric Power Research Institute Cooperation to Increase Energy Efficiency, March 6, 2008 Electric Power Research Institute Cooperation to Increase Energy Efficiency, March 6, 2008 The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI) strengthened cooperation for research, development and deployment of energy technologies aimed at promoting increased energy efficiency. DOE and EPRI yesterday signed a Memorandum of Understanding (MOU) establishing a framework for close coordination to advance the common goal of satisfying the nation's growing electricity needs by improving energy efficiency and promoting the widespread adoption of electric energy demand response programs in an effort to curtail energy use during peak periods.

409

Energy Department - Electric Power Research Institute Cooperation to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Electric Power Research Institute Cooperation - Electric Power Research Institute Cooperation to Increase Energy Efficiency Energy Department - Electric Power Research Institute Cooperation to Increase Energy Efficiency March 6, 2008 - 10:52am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI) strengthened cooperation for research, development and deployment of energy technologies aimed at promoting increased energy efficiency. DOE and EPRI yesterday signed a Memorandum of Understanding (MOU) establishing a framework for close coordination to advance the common goal of satisfying the nation's growing electricity needs by improving energy efficiency and promoting the widespread adoption of electric energy demand response programs in an effort to curtail energy

410

Electrostatic Precipitator Performance Modeling of High Carbon Ash Using EPRI's ESPM  

Science Conference Proceedings (OSTI)

To meet reduced nitrogen oxide (NOX) emission limits, many power producers installed low-NOX combustion systems that raised the level of carbon in the ash. However, carbon can be difficult to collect in an electrostatic precipitator and, consequently, the particulate emissions from many affected units increased. EPRI initiated this study to better understand carbon capture in electrostatic precipitators (ESPs), improve collection of high carbon ashes, and predict the collection of such ashes with its ESP...

2007-03-19T23:59:59.000Z

411

EPRI Products Can Help Utilities with Leakage Issues for Diesel Generators and Other Equipment  

Science Conference Proceedings (OSTI)

This notification is intended to make members aware of several EPRI products that help prevent problems with fluid leakage on diesel generators and other plant systems to improve component reliability. These reports are focused on fluid joints, and solutions to help plant personnel better maintain systems and reduce component failures due to leaks and increase overall station reliability. This information contained in this update could be useful to members of your organization responsible for the mainten...

2012-06-01T23:59:59.000Z

412

EPRI CCAPI Task Force, Generic Interface Definition (GID): DRAFT-API Design for GID  

Science Conference Proceedings (OSTI)

This document reviews a common data access application program interface (API) which is supported by EPRI's Control Center Application Program Interface's (CCAPI) Task Force. The CCAPI Task Force is charged with producing standards to facilitate the integration of energy management system (EMS) applications developed independently or between an EMS system and other systems concerned with different aspects of power system operations, such as generation or distribution management systems (DMS). This is acc...

2000-06-30T23:59:59.000Z

413

2012 End-Use Energy Efficiency and Demand Response, EPRI Program 170: Summary of Deliverables  

Science Conference Proceedings (OSTI)

The EPRI research program on End-Use Energy Efficiency and Demand Response (Program 170) is focused on the assessment, testing, and demonstration of energy-efficient and intelligent end-use devices, as well as analytical studies of the economic, environmental, and behavioral aspects of energy efficiency and demand response. The 2012 reports, tools and resources produced in this program are available to employees of funding companies, and can be accessed by clicking on the product number link listed after ..

2013-05-22T23:59:59.000Z

414

EPRI 2002 Workshop on Combustion-Based NOx Controls for Coal-Fired Boilers  

Science Conference Proceedings (OSTI)

The Workshop on Combustion-Based NOx Controls for Coal-Fired Boilers, formerly the Workshop on NOx Controls for Utility Boilers, was the sixth in a series sponsored by EPRI and offered attendees a comprehensive picture of recent developments and full-scale applications of control technologies for nitrogen oxides (NOx). The workshop took place on October 24-25, 2002, in Atlanta, Georgia.

2003-01-14T23:59:59.000Z

415

Proceedings: EPRI 2009 HVDC and Flexible AC Transmission Systems (FACTS) Conference  

Science Conference Proceedings (OSTI)

The 2009 EPRI HVDC and FACTS Conference was held November 5-6, 2009, at the headquarters of Tri-State Generation and Transmission Association, Inc. in Westminster, Colorado. The conference brought together utilities, researchers, and equipment suppliers to discuss the current state of research and development in high-voltage direct current (HVDC) and flexible AC transmission systems (FACTS) technologies. The presentations and session discussions covered a broad range of initiatives under way in North Ame...

2009-12-17T23:59:59.000Z

416

Proceedings: 2004 EPRI Topical Workshop - License Termination Plans/Final Site Release  

Science Conference Proceedings (OSTI)

One of the final challenges in plant decommissioning is that of license termination and final site release. The EPRI Decommissioning - License Termination and Final Site Release Workshop was the tenth in a series designed to aid utility personnel in decommissioning nuclear power plants. This workshop focused on specific aspects of license termination activities and final site release as they relate to decommissioning. The information presented will update utilities on developments and experience related ...

2005-09-16T23:59:59.000Z

417

Development of New LLW Disposal Options: Phase I Interim Report on the EPRI Industry Strategic Database  

Science Conference Proceedings (OSTI)

Nuclear utilities need a comprehensive industry-wide LLW database to provide intelligence for executive level decision making related to the future of LLW disposal and clearance practices. NEI, the NRC and EPA are requesting this data. The US Government Accounting Office (GAO) also referenced a lack of reliable industry LLW data in its 2004 report on future US LLW disposal options. This report provides initial results from the EPRI initiative filling this data gap.

2005-12-06T23:59:59.000Z

418

EPRI Clean Water Act 316(b) Fish Protection Technology Workshop Proceedings: September 30, 2004, Holden, Massachusetts  

Science Conference Proceedings (OSTI)

This compact disc (CD) contains presentations made at the EPRI Clean Water Act §316(b) Fish Protection Technology Workshop held at the facilities of Alden Research Laboratory in Holden, Massachusetts on September 30, 2004. The presentations provide engineering and visual information on many types of cooling water intake structure fish protection technologies, including barrier nets, behavioral barriers (strobe lights and acoustic systems), traveling water screens, rotary screens, flat panel and cyli...

2004-12-27T23:59:59.000Z

419

Heat Stress Management Program for Power Plants: Clothing Update of EPRI NP-4453-L -- 1991 Report  

Science Conference Proceedings (OSTI)

Clothing ensembles that protect workers from radioactive skin contamination can potentially increase the risk for heat stress. To address this issue, most nuclear power plants calculate action times (stay times) based on the ambient temperature and humidity, work level, and the protective clothing worn. The 1991 EPRI Heat Stress Management Program for Power Plants (report NP-4453-L, Rev. 1) described common methods for evaluating heat stress and provided the necessary adjustment factors for five specific...

1998-08-25T23:59:59.000Z

420

Proceedings: EPRI/NEI Technical Information Workshop - Nuclear Plant Groundwater Monitoring  

Science Conference Proceedings (OSTI)

The EPRI Groundwater Protection Workshop focused on the subject of groundwater monitoring related to nuclear plant sites. This subject is very important to both decommissioning and operating plants. The Workshop provided information to assist operating plants in the development of technically sound plant site groundwater monitoring programs. Presentations provided the latest information on groundwater assessments, such as related tools, strategies, technologies and experience. The program included inform...

2007-07-19T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

2005 EDF/EPRI Collaboration on Life Cycle Management and Nuclear Asset Management  

Science Conference Proceedings (OSTI)

As the age of Electricit de Frances (EDFs) nuclear fleet grows and the European energy market evolves closer to being competitive, EDFs attention to life cycle management (LCM) and nuclear asset management (NAM) continues to increase. Optimizing operations and maintenance (OM) and capital expenditures at the plant and fleet level and selecting the most appropriate lifespan for plants are complex issues. This report of the 2005 EDF/EPRI workshop on LCM and NAM describes progress and plans for supporting t...

2006-03-31T23:59:59.000Z

422

9th EPRI Balance-of-Plant Heat Exchanger NDE Symposium Proceedings  

Science Conference Proceedings (OSTI)

The 9th EPRI Balance-of-Plant Heat Exchanger NDE Symposium was held in Big Sky, Montana on June 26 28, 2006. It consisted of four pre-symposium short courses and two and one-half days of combined paper presentations and vendors fair. Attendees included representatives from domestic and international utilities, research organizations, NDE service and equipment vendors, and heat exchanger component repair and replacement organizations. This biennial symposium serves as a forum for plant engineers, NDE spec...

2006-08-11T23:59:59.000Z

423

8th EPRI Balance-of-Plant Heat Exchanger NDE Symposium  

Science Conference Proceedings (OSTI)

The Eighth EPRI Balance-of-Plant Heat Exchanger NDE Symposium was held in Key West, Florida on June 21-23, 2004. It consisted of three pre-symposium short courses and two and one-half days of combined paper presentations and vendor fair. Attendees included representatives from domestic and international utilities, research organizations NDE service and equipment vendors, and repair/replacement organizations. This biennial symposium serves as a forum for plant engineers and NDE specialists to meet, discus...

2004-08-25T23:59:59.000Z

424

Program on Technology Innovation: Summary of 2012 EPRI Nuclear Fuel Cycle Assessment Workshop  

Science Conference Proceedings (OSTI)

Government, industry, and academic stakeholders met at an EPRI-sponsored Nuclear Fuel Cycle Assessment Workshop, held July 23–24, 2012, to exchange perspectives, plans, and insights concerning how fuel cycle technology options should be evaluated for the purposes of research, development, and demonstration (RD&D) as well as eventual deployment. The workshop reviewed efforts in the screening and assessment of advanced nuclear fuel cycle options for future energy systems and focused on the ...

2012-12-07T23:59:59.000Z

425

Program on Technology Innovation: EPRI Yucca Mountain Spent Fuel Repository Evaluation  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) is moving to prepare and submit a license application to the Nuclear Regulatory Commission (NRC) to initiate construction of a geologic repository at Yucca Mountain, Nevada, for the storage of spent nuclear fuel and high level radioactive waste. Throughout the nearly 20-year history of the project, EPRI has performed independent assessments of technical and scientific issues considered important to eventual repository licensing. This report presents background on the overal...

2007-12-19T23:59:59.000Z

426

EPRI Condenser Pressure Measurement Project at Alliant Energy's Ottumwa Unit 1  

Science Conference Proceedings (OSTI)

Monitoring plant heat rate, precisely estimating turbine efficiency, deciding whether the condenser pressure is acceptable for a particular set of conditions, providing the basis for an early remedial action, and determining whether the condenser tubes should be cleaned all require an accurate value of the condenser pressure. In addition, the condenser pressure has the largest effect on heat rate of any parameter in the power plant.In June 2012, EPRI initiated a project to establish the ...

2012-11-26T23:59:59.000Z

427

EPRI Probabilistic Risk Assessments (PRA) Computer Based Training (CBT) v1.0  

Science Conference Proceedings (OSTI)

This Computer Based Training (CBT) module provides a high level introduction to the fundamentals of Probabilistic Risk Assessment (PRA) and its use in Risk Informed (RI) Regulation. The EPRI Risk and Safety Management (RSM) Program is developing a series of CBT Modules to assist in the socialization of risk technology, more specifically the understanding of the plant specific Probabilistic Risk Assessments (PRA) and risk informed regulation. The series of PRA CBT modules are developed in a hierarchical o...

2010-01-22T23:59:59.000Z

428

Decommissioning: License Termination and Final Site Release: Proceedings of EPRI Technical Workshop, October 2001  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI workshop on decommissioning license termination and final site release. The workshop was the eighth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. This workshop focused on specific aspects of license termination and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecting the best practices an...

2002-02-08T23:59:59.000Z

429

EPRI PWR Fuel Cladding Corrosion (PFCC) Model: Volume 2: Corrosion Theory and Rate Equation Development  

Science Conference Proceedings (OSTI)

The EPRI PWR Fuel Cladding Corrosion (PFCC) model has been developed to help utilities manage high burnup fuel cladding corrosion and hydriding issues. The model predicts the peak oxide thickness with 92 percent confidence of being within plus or minus 10 micrometers of the measured value, with a conservative bias of 7 micrometers when the metallurgical variables are well characterized. This volume documents the evolution of the rate equation for predicting Zircaloy cladding corrosion and the database us...

1997-03-04T23:59:59.000Z

430

Program on Technology Innovation: EPRI Yucca Mountain Spent Fuel Repository Evaluation  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) is moving to prepare and submit a license application to the Nuclear Regulatory Commission (NRC) to initiate construction of a geologic repository at Yucca Mountain, Nevada, for the storage of spent nuclear fuel and high level radioactive waste. Throughout the more than 20-year history of the project, EPRI has performed independent assessments of technical and scientific issues considered important to eventual repository licensing. This report presents background on the ove...

2006-12-19T23:59:59.000Z

431

Proceedings of the August 2004 EPRI PWR Primary Zinc Addition Workshop  

Science Conference Proceedings (OSTI)

Approximately 60 people attended the workshop, including representatives from 21 utilities, three nuclear system and/or fuel suppliers (Areva, ENUSA, and Westinghouse), EPRI, INPO, ORNL, KAPL, the University of New Brunswick, and several consulting organizations. Personnel from Canada, France, Germany, Spain, Sweden, and the United States were present. Presentations and discussions covered the following areas: • Background Science • Status of Research on Application • Field Experience &bul...

2005-01-17T23:59:59.000Z

432

Primary System Corrosion Research Program: EPRI Materials Degradation Matrix, Revision 2  

Science Conference Proceedings (OSTI)

The EPRI Materials Degradation Matrix (MDM) is a key part of the industrys Materials Degradation and Issue Management Initiative. The MDM provides a comprehensive review of degradation mechanisms applicable to the nuclear steam supply system components in light water reactor plants and assesses the extent to which these degradation mechanisms are understood. The MDM also evaluates the state of industry knowledge worldwide associated with mitigation of applicable degradation mechanisms.

2010-08-30T23:59:59.000Z

433

FirstEnergy Uses EPRI Interregional Reactive Power Management Framework to Help Improve Transmission Voltage Stability  

Science Conference Proceedings (OSTI)

FirstEnergy teamed with EPRI and Powertech Labs to develop a practical, automated method for identifying areas prone to voltage instability due to a lack of reactive power reserves. Power system designers and operational planning engineers can use the new method to evaluate the performance of various power system designs or configurations with regard to susceptibility to voltage instability, determine weak areas requiring special remediation, and maximize the efficient use of assets by determining the mi...

2008-08-19T23:59:59.000Z

434

Program on Technology Innovation: Health Effects of Organic Aerosols: An EPRI/NARSTO Workshop  

Science Conference Proceedings (OSTI)

The EPRI-NARSTO Health Effects of Organic Aerosols Workshop was held in Palo Alto, California on October 24-25, 2006. The workshop was intended to further our understanding of the organic fraction of ambient particulate matter (PM) and associated organic gases. The composition of organic aerosol is very complex, varying in accordance with physical and chemical processes in the atmosphere and comprising numerous organic compounds of both anthropogenic and natural origin. The workshop focused on organic ae...

2007-03-27T23:59:59.000Z

435

Summary of the 2013 EPRI/NATF Industry Summit on Physical Security of Transmission Assets  

Science Conference Proceedings (OSTI)

Compromises to power system physical security can cause long-term outages, which can adversely impact the economy, the environment, public safety, and national security. Such compromises could cost utilities, and ultimately society, billions of dollars. Recent physical security incidents have heightened awareness of the need for greater emphasis on the physical security of substations and transmission facilities. To begin a collaborative process of addressing physical security threats, EPRI and the ...

2013-11-26T23:59:59.000Z

436

EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities Volume 1: Summary & Overview, Volume 2: Detailed Methodology  

Science Conference Proceedings (OSTI)

The Fire Risk Requantification Study has resulted in state-of-the-art methods, tools, and data for a fire probabilistic risk assessment (PRA) for commercial nuclear power plant application. This study was conducted jointly by EPRI and the U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) under the terms of an NRC/EPRI Memorandum of Understanding and an accompanying Fire Research Addendum. Industry participants supported demonstration analyses and provided peer review of...

2005-09-19T23:59:59.000Z

437

Advanced Nuclear Technology: Impact of EPRI Pre-Operational and Operational Configuration Management Report (1022684) on the Nuclear Industry  

Science Conference Proceedings (OSTI)

EPRI Technical Report 1022684, Elements of Pre-Operational and Operational Configuration Management for a New Nuclear Facility, was developed by an EPRI Advanced Nuclear Technology (ANT) technical advisory group whose mission was to develop guidance for establishing a comprehensive configuration management (CM) program for the unique challenges of a new nuclear facility. The program elements developed for the pre-operation phase would then be in place to manage the configuration for the ...

2013-03-20T23:59:59.000Z

438

Critical Equipment Maintenance Using EPRI Preventive Maintenance Basis Database (PMBD) Recommendations for a Combustion Turbine Plan t  

Science Conference Proceedings (OSTI)

This technical update report covers specific component preventive maintenance strategies that were developed in cooperation with East Kentucky Power Cooperatives J.K. Smith plant personnel and EPRIs Generation Sector Fossil O&M group personnel. The EPRI Preventive Maintenance Basis Database (PMBD) 2.0 software tool was used to define preventive maintenance defense strategies for specific plant components. Many of the plant components were located in the balance-of-plant (BOP) areas at the station. The ma...

2009-11-06T23:59:59.000Z

439

Utility/Industry Partnerships Involving Distributed Generation Technologies in Evolving Electricity Markets  

E-Print Network (OSTI)

Electricity markets in the United States are undergoing unprecedented structural changes as a result of the confluence of regulatory, competitive, and technological forces. This paper will introduce the role of distributed generation technologies in evolving electric markets and will review both current and emerging distributed generation technologies aimed at retail industrial, commercial and residential markets. This paper will draw upon several Electric Power Research Institute’s (EPRI) and member utility case studies involving the assessment of distributed generation in premium power service, standby power and industrial cogeneration applications. In addition, EPRI products and services which can help evaluate energy service options involving distributed generation will also be briefly reviewed.

Rastler, D. M.

1997-04-01T23:59:59.000Z

440

Coordinated Cyber-Physical Attacks, High-Impact Low-Frequency (HILF) Events, and Risk Management in the Electric Sector  

Science Conference Proceedings (OSTI)

Although the North American electricity grid is one of the most reliable power systems in the world, the high-impact low-frequency (HILF) class of rare but potentially catastrophically damaging events is of growing concern in the industry. This white paper summarizes key activities under two EPRI initiatives that address a HILF cyber-physical attack as well as risk assessment approaches and management tools relevant to a HILF event.EPRI’s Cyber Security and Privacy Program ...

2012-12-12T23:59:59.000Z

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Review of Used Nuclear Fuel Storage and Transportation Technical...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the U.S. Nuclear Regulatory Commission (NRC), the Electric Power Research Institute (EPRI), and the International Atomic Energy Agency (IAEA). The documents reviewed are:...

442

Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study  

DOE Green Energy (OSTI)

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

Hadley, Stanton W [ORNL

2012-01-01T23:59:59.000Z

443

PRISM 2.0: Regional Energy and Economic Model Development and Initial Application: Phase 2: Electric Sector CO2 Reduction Options to 2050: Dimensions of Technology, Energy Costs, and Environmental Scenarios  

Science Conference Proceedings (OSTI)

EPRI conducted an analysis of electric sector CO2 reduction options to 2050 across a range of scenarios covering dimensions of technology costs and availability, energy costs, and CO2 constraints.  Using its U.S. Regional Economy, Greenhouse Gas, and Energy (US-REGEN) model, EPRI calculated the impact of changes in generation portfolio, generation capacity, expenditures, and electricity prices on power sector costs. This analysis estimates different levels of ...

2013-11-06T23:59:59.000Z

444

Electric Power Research Institute Cooperation to Increase Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Institute Cooperation to Increase Energy Research Institute Cooperation to Increase Energy Efficiency, March 6, 2008 Electric Power Research Institute Cooperation to Increase Energy Efficiency, March 6, 2008 The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI) strengthened cooperation for research, development and deployment of energy technologies aimed at promoting increased energy efficiency. DOE and EPRI yesterday signed a Memorandum of Understanding (MOU) establishing a framework for close coordination to advance the common goal of satisfying the nation's growing electricity needs by improving energy efficiency and promoting the widespread adoption of electric energy demand response programs in an effort to curtail energy use during peak periods. Electric Power Research Institute Cooperation to Increase Energy

445

agencies must freeze spending  

Science Conference Proceedings (OSTI)

Among the very specific directives, the "Evidence-Based Innovation" states that " Especially within tight resource constraints, agencies are encouraged to use ...

446

Experts Tests Agencies' Skills  

NLE Websites -- All DOE Office Websites (Extended Search)

Homeland Security's Domestic Nuclear Detection Office (DNDO). The goal was to challenge state and local agencies' abilities to protect the public by detecting radioactive...

447

Electric G-Van demonstration and commercial assessment project. Final report  

DOE Green Energy (OSTI)

The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

Braga, B.D. [Electric Power Research Inst., Palo Alto, CA (United States)] [Electric Power Research Inst., Palo Alto, CA (United States)

1992-12-01T23:59:59.000Z

448

FY 2012 DOE Agency Financial Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports » Agency Financial Reports » FY 2012 DOE Agency Financial Reports » Agency Financial Reports » FY 2012 DOE Agency Financial Report FY 2012 DOE Agency Financial Report Notable accomplishments in FY 2012 include: the first electric grid-connected tidal energy project off the coast of Maine a new approach to sea water desalination that could lower the costs of water purification new insights into the molecular structure of a hydrogen fuel cell that could aid in achieving the goal of producing electricity for transportation new advances in engineering inedible plant biomass into biofuels In the national security area, we met a major milestone of eliminating 450 metric tons of highly enriched Russian uranium taken from nuclear weapons and the dismantlement of the last remaining B53 nuclear bomb. FY 2012 Agency Financial Report

449

Validation of EPRI Methodology for Analysis of Spend-Fuel Cask Drop and Tipover Events  

Science Conference Proceedings (OSTI)

Dry storage pads(typically consisting of reinforced concrete slabs constructed on engineered fill(ultimately serve as in situ impact limiters which can be designed to minimize the impact forces on a spent-fuel storage cask. This report presents experimental validation of a previously developed EPRI method for calculating deceleration forces sustained by a spent-fuel cask during its accidental drop or tipover onto a concrete storage pad. The report also describes a step-by-step procedure for applying the ...

1997-09-12T23:59:59.000Z

450

Generic OTS, EPRI Generic Operator Training Simulator, Version 2.0  

Science Conference Proceedings (OSTI)

The EPRI Generic Operator Training Simulator, Generic OTS Version 2.0 is a PC-based training simulator that allows hands-on training for dispatchers, using a generic 29 station model. Simulation-based training has long been recognized as an important component of power system operator training. The Generic OTS, which can be run on multiple platforms, allows for realistic simulations of many power system phenomena. A generic Power and Light model can be employed, or the user has the ability to include the...

2006-12-13T23:59:59.000Z

451

EPRI Transmission Line Reference Book (Blue Book): 115-345 kV Compact Line Design  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the Blue Book, which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines. Note that this electronic report is being pu...

2007-12-13T23:59:59.000Z

452

Advanced Electric Motor Predictive Maintenance Project  

Science Conference Proceedings (OSTI)

EPRI sponsored the three-year Advanced Electric Motor Predictive Maintenance (AEMPM) project in 2000 to increase the effectiveness of motor maintenance at a time when utilities were in a state of declining motor knowledge due to downsizing and restructuring. The project identified areas for improvement that were common to most utilities and selected appropriate measures to address these concerns. Areas addressed include documenting motor knowledge, increasing utility confidence in newer technologies and ...

2003-05-28T23:59:59.000Z

453

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

High-voltage direct current (HVDC) transmission lines are used to transmit large amounts of power over long distances. The Electric Power Research Institute (EPRI) and others have produced many publications over approximately the past three decades, expounding on this topic. Several HVDC transmission lines have been built and have been in operation around the world over that period, and recently, there has been increased interest in the advantages that HVDC transmission affords. HVDC lines, like high-vol...

2010-12-23T23:59:59.000Z

454

Non-Wires Alternatives to Achieving Electric Delivery Reliability Goals: Case Study  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) launched the Program 172, Transmission and Distribution Efficiency in a Carbon-Constrained World initiative to focus research on improving the efficiency of the electric delivery system. It included parallel research projects to explore the feasibility of utilities employing non-wires solutions to meeting transmission and distribution (T&D) electric reliability obligations. Traditionally, electric grid investments are made by utilities based on foreca...

2010-12-31T23:59:59.000Z

455

Memorandum of Understanding Regarding Coordination in Federal Agency Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum of Understanding Regarding Coordination in Federal Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land. The MOU will improve uniformity, consistency, and transparency by describing each entity's role and responsibilities when project applicants wish to build electric transmission facilities.

456

Electric Vehicle Supply Equipment (EVSE) Test and Evaluation  

Science Conference Proceedings (OSTI)

Deployment of electric vehicle supply equipment (EVSE) to support the electrification of transportation continues worldwide. In the United States alone, thousands of EVSEs have been deployed over the last year. EVSE hardware is designed to safely provide AC or DC power to plug-in electric vehicles in both commercial and residential spaces. More than 40 vendors have been identified that manufacture EVSE products for the North American market. EPRI has performed laboratory evaluations for a ...

2012-12-31T23:59:59.000Z

457

Electric Vehicles: Characterizing Consumers' Interest and Infrastructure Expectations  

Science Conference Proceedings (OSTI)

EPRI and Southern California Edison (SCE) undertook the design and implementation of a survey to characterize consumers' perceptions of plug-in hybrid electric vehicles (PHEVs) and their expectations of their electric utility as the supplier of transportation energy and associated services. The objective was to develop and test a survey instrument and associated analytical methods that could subsequently be employed by utilities and other entities to inform local stakeholders about consumers' perspective...

2009-11-30T23:59:59.000Z

458

Electric Energy Industry Workforce: Trends in Motor Vehicle Crashes  

Science Conference Proceedings (OSTI)

EPRI has established an ongoing injury/illness research programthe Occupational Health and Safety Database (OHSD) Programto provide information about the occurrence of workplace injury and illness among the electric energy industry workforce. Vehicles operated by electric utility workers typically include bucket trucks, digger/derrick trucks, washer trucks, pole and material trucks and trailers, and other vehicles used in line construction and maintenance. These vehicles are generally operated over low m...

2007-04-26T23:59:59.000Z

459

Hawaiian Electric Company (HECO) Smart Grid (SG) Demonstration Project Description  

Science Conference Proceedings (OSTI)

This report describes one smart grid demonstration host-site project. The Hawaiian Electric Company (HECO) host site is part of the Electric Power Research Institute's (EPRI's) seven-year Smart Grid Demonstration Initiative. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable generation, into a "virtual power plant" to advance the widespread, efficient, and cost-effective deployment of ...

2012-08-13T23:59:59.000Z

460

Notices ENVIRONMENTAL PROTECTION AGENCY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25 Federal Register 25 Federal Register / Vol. 76, No. 209 / Friday, October 28, 2011 / Notices ENVIRONMENTAL PROTECTION AGENCY [FRL-9484-2] Children's Health Protection Advisory Committee (CHPAC); Notice of Charter Renewal AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of Charter Renewal. Notice is hereby given that the Environmental Protection Agency (EPA) has determined that, in accordance with the provisions of the Federal Advisory Committee Act (FACA), 5 U.S.C. App.2. The Children's Health Protection Advisory Committee (CHPAC) is a necessary committee which is in the public interest. Accordingly, CHPAC will be renewed for an additional two- year period. The purpose of CHPAC is to provide advice and recommendations to the Administrator of EPA on issues

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Notices ENVIRONMENTAL PROTECTION AGENCY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 Federal Register 22 Federal Register / Vol. 75, No. 103 / Friday, May 28, 2010 / Notices ENVIRONMENTAL PROTECTION AGENCY [FRL-9156-1] Office of Research and Development; Ambient Air Monitoring Reference and Equivalent Methods: Designation of One New Equivalent Method AGENCY: Environmental Protection Agency. ACTION: Notice of the designation of one new equivalent method for monitoring ambient air quality. SUMMARY: Notice is hereby given that the Environmental Protection Agency (EPA) has designated, in accordance with 40 CFR Part 53, one new equivalent method for measuring concentrations of lead (Pb) in total suspended particulate matter (TSP) in the ambient air. FOR FURTHER INFORMATION CONTACT: Surender Kaushik, Human Exposure and Atmospheric Sciences Division (MD-D205-03), National Exposure

462

Microsoft Word - 41231_EPRI_Hot Section Coating Life Mgmt_Factsheet_Rev01_10-03.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Prepared 2/6/03 Prepared 2/6/03 Combustion Turbine (CT) Hot Section Coating Life Management EPRI FACT SHEET I. PROJECT PARTICIPANTS 1. Prime Participant: EPRI A. Sub-Award Participants: Southwest Research Institute Turbine Technology International II. PROJECT DESCRIPTION A. Objectives The objective of this project is to improve the reliability, availability and maintainability (RAM) of combustion turbines (CTs) by developing advanced technology for assessing and managing the life of protective coatings on CT blades and vanes. B. Background Degradation of protective coatings represents a major profitability challenge for combustion turbine owners. Coating life dictates blade refurbishment intervals and the need for costly replacement. A proper life management

463

EPRI/C-E PWR Safety Valve Test Report Volume 3: Test Results for Dresser Safety Valve Model 31739A  

Science Conference Proceedings (OSTI)

EPRI at the request of the PWR utilities developed an overall program for the testing of PWR primary system safety and relief valves. This program was in response to NUREG 0578 Item 2.1.2 and NUREG 0737 Item II.D.1.A requirements. This report documents the results of safety valve testing performed as part of the overall program at the EPRI/C-E Valve Test Facility located at Combustion Engineering's Kreisinger Development Laboratory, Windsor, Connecticut. Seven safety valves representative of those utiliz...

1983-02-01T23:59:59.000Z

464

Cutting Electricity Costs in Miami-Dade County, Florida | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home Cutting Electricity Costs in Miami-Dade County, Florida Cutting Electricity Costs in Miami-Dade County,...

465

U.S.-China Electric Vehicle and Battery Technology Workshop ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home U.S.-China Electric Vehicle and Battery Technology Workshop U.S.-China Electric Vehicle and Battery Technology Workshop...

466

EA-1722: Toxco, Inc. Electric Drive Vehicle Battery and Component...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home EA-1722: Toxco, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative, Lancaster, OH EA-1722: Toxco, Inc. Electric...

467

Southern Company Electric Vehicle Survey: Consumer Expectations for Electric Vehicles  

Science Conference Proceedings (OSTI)

Plug-in Electric Vehicles (PEV) are becoming increasingly available in the U.S. Two manufacturers (GM and Nissan) offer vehicles that are being advertised and promoted, heavily in some areas. The PEV is advancing rapidly from a concept or hypothetical travel mode to a viable option for new car buyers. The result is that consumers will take over the driver’s seat when it comes to adoption of PEVs and how they are used. For that reason, EPRI has initiated research into how consumers perceive PEVs as an alt...

2011-10-10T23:59:59.000Z

468

TVA Electric Vehicle Survey: Consumer Expectations for Electric Vehicles  

Science Conference Proceedings (OSTI)

Plug-in Electric Vehicles (PEV) are becoming increasingly available in the U.S. Two manufacturers (GM and Nissan) offer vehicles that are being advertised and promoted, heavily in some areas. The PEV is advancing rapidly from a concept or hypothetical travel mode to a viable option for new car buyers. The result is that consumers will take over the driver’s seat when it comes to adoption of PEVs and how they are used. For that reason, EPRI has initiated research into how consumers perceive PEVs as an alt...

2011-10-10T23:59:59.000Z

469

Power Plant Electrical Reference Series: Guide for Rewinding and Reconditioning Medium Voltage Electric Motors: Volume 17  

Science Conference Proceedings (OSTI)

When medium-voltage motors fail, plant managers and other utility personnel have to oversee repair and rewinding. This guide provides a short-course approach to medium voltage motor repair, with sample specifications and check-off sheets to help the nonspecialist get the best service from the repair shop. The guide can also serve as a technical reference for the specialist.BackgroundThe 16 previous volumes of EPRI's Power Plant Electrical Reference Series ...

1996-09-19T23:59:59.000Z

470

FY 2013 DOE Agency Financial Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agency Financial Reports » FY 2013 DOE Agency Financial Agency Financial Reports » FY 2013 DOE Agency Financial Report FY 2013 DOE Agency Financial Report Notable accomplishments in FY 2013: Investments in energy transformation have resulted in testing of greenhouse gas storage, the first grid-connected offshore wind prototype, cost competitive advances in cellulosic ethanol, the first commercial geothermal system to deliver power to the electric grid, improved efficiency and cyber security for the electric grid, new appliance efficiency standards, the first full-scale nuclear reactor simulation. Basic research in the science field yielded several results, such as: the discovery of a powerful new microbe, major improvements to organic electronics, high-resolution molecular images, 3D printed batteries, improved efficiency in thermoelectric devices.

471

FY 2013 DOE Agency Financial Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agency Financial Reports » FY 2013 DOE Agency Financial Agency Financial Reports » FY 2013 DOE Agency Financial Report FY 2013 DOE Agency Financial Report Notable accomplishments in FY 2013: Investments in energy transformation have resulted in testing of greenhouse gas storage, the first grid-connected offshore wind prototype, cost competitive advances in cellulosic ethanol, the first commercial geothermal system to deliver power to the electric grid, improved efficiency and cyber security for the electric grid, new appliance efficiency standards, the first full-scale nuclear reactor simulation. Basic research in the science field yielded several results, such as: the discovery of a powerful new microbe, major improvements to organic electronics, high-resolution molecular images, 3D printed batteries, improved efficiency in thermoelectric devices.

472

EPRI Pre-Conference Workshop: Active Distribution System Management for Integration of Distributed Resources Research, Development a nd Demonstration Needs  

Science Conference Proceedings (OSTI)

This report documents the proceedings of the EPRI Pre-Conference Workshop: Active Distribution System Management for Integration of Distributed ResourcesResearch, Development and Demonstration Needs, held December 9, 2008. This workshop presented over 20 projects related to active distribution management for distributed energy resource (DER) integration.

2009-04-27T23:59:59.000Z

473

Accurate Short Term Load Forecasting for an ESKOM Major Distribution Region in South Africa: An Application of EPRI ANNSTLF  

Science Conference Proceedings (OSTI)

ANNSTLF (Artificial Neural Network Short-term Load Forecaster), developed by EPRI, is a Microsoft Windows-based neural-network load forecasting software that uses historical load and weather parameters to predict future load values. The software requires customization for each utility. This project involved customizing ANNSTLF for the Eastern Region of the South African energy company ESKOM.

2005-09-27T23:59:59.000Z

474

Supplemental Guidance for the Application of EPRI Report NP-5652 on the Utilization of Commercial Grade Items  

Science Conference Proceedings (OSTI)

Significant industry activity has occurred in the area of commercial grade dedication since the publication of EPRI NP-5652 in 1988. This document evaluates these activities and provides updated information which can further assist utilities in reducing the engineering and procurement costs associated with commercial grade items (CGIs) intended for nuclear safety-related applications.

1994-05-26T23:59:59.000Z

475

EPRI Comments on a Study of Mobile Phones and Adult Central Nervous System Tumors in the United Kingdom  

Science Conference Proceedings (OSTI)

Results from a large UK prospective epidemiologic study examining mobile phone use and incident adult central nervous system cancers were published in the International Journal of Epidemiology. The authors reported no association between mobile phone use and incidence of gliomas or meningiomas.  The EPRI Comments provides background information on the study, summarizes the main results, and discusses the study’s strength and limitations. 

2013-06-18T23:59:59.000Z

476

FOOD STANDARDS AGENCY SCOTTISH ENVIRONMENT PROTECTION AGENCY  

E-Print Network (OSTI)

2 FOREWORD We are pleased to present the 9th annual Radioactivity in Food and the Environment report, which contains radiological monitoring data for 2003. This report is the second to contain radiological monitoring data from our four agencies, providing a complete picture of the levels of radioactivity found in food and the environment in the UK. The report builds on the success of last year’s report by considering a new methodology of assessing dose to the public for some of the UK’s nuclear sites. This new methodology takes account of all public exposure routes in a realistic way, leading to an improved and more reliable assessment of dose to the public from

Radiological Monitoring; Bamber Bridge; Preston Pr Bx; Castle Place; Erskine Court; Stirling Fk Tr

2004-01-01T23:59:59.000Z

477

Notices ENVIRONMENTAL PROTECTION AGENCY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

076 Federal Register 076 Federal Register / Vol. 77, No. 250 / Monday, December 31, 2012 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9006-8] Notice of Intent: Designation of an Expanded Ocean Dredged Material Disposal Site (ODMDS) off Charleston, South Carolina AGENCY: U.S. Environmental Protection Agency (EPA) Region 4. ACTION: Notice of Intent to prepare an Environmental Assessment (EA) for the designation of an expanded ODMDS off Charleston, South Carolina. Purpose: EPA has the authority to designate ODMDSs under Section 102 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1401 et seq.). It is EPA's policy to prepare a National Environmental Policy Document for all ODMDS designations (63 FR 58045, October 1998). FOR FURTHER INFORMATION, TO

478

The model electric restaurant  

SciTech Connect

Starting in December 1987, the Electric Power Research Institute (EPRI) and Southern California Edison (SCE) initiated a project with the Pennsylvania State University (Penn State) to study the energy performance of restaurants. Penn State formed the Restaurant Subsystems Technology (REST) project team to conduct the Model Restaurant Project. For the first phase of the project, the REST team was charged with the responsibility of identifying and investigating electric technologies to improve energy efficiency and to reduce peak demand in new restaurants. Energy and economic analyses were performed to determine whether these electric technologies are competitive with existing technologies in gas/electric restaurants and whether they are improvements to current technologies in all-electric restaurants. Technologies for heating and cooling, lighting, sanitation, food preparation, ventilation, and refrigeration were studied. This report contains detailed monthly information about the restaurants that were simulated. The results are presented on a monthly basis so the reader can study performance during all seasons. However, this second volume is not a stand alone'' document. To fully understand the information presented here, the reader must have a copy of Volume 1 and be familiar with the terminology used to describe the various restaurants and the process used to analyze the buildings.

Frey, D.J.; Oatman, P.A. (Architectural Energy Corp., Boulder, CO (USA)); Claar, C.N. (Pennsylvania State Univ., University Park, PA (USA))

1990-12-01T23:59:59.000Z

479

Biometrics Identity Management Agency Laboratory  

Science Conference Proceedings (OSTI)

Biometrics Identity Management Agency Laboratory. NVLAP Lab Code: 200933-0. Address and Contact Information: 1000 ...

2013-08-09T23:59:59.000Z

480

Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subtopic c. References: Subtopic c. References: 1. Thomas B. Johansson, Henry Kelly, Amulya K.N. Reddy, and Robert H. Williams, "Renewable Energy: Sources for Fuels and Electricity", Island Press, 1993 2. Patrick Takahashi and Andrew Trenka, "Ocean Thermal Energy Conversion", John Wiley & sons, 1996. *All references can be accessed at: http://archive.epri.com/oceanenergy/streamenergy.html#reports OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY 28. NATURAL DISASTER REDUCTION THROUGH TECHNOLOGY The U.S. electric power sector is a critical part of our society. Virtually all aspects of residential, industrial, and commercial activities depend on safe, reliable, and affordable electricity. Electricity is among the most infrastructure-intensive segments of the energy sector - the electricity grid includes a network of 5,000 power

Note: This page contains sample records for the topic "agency epri electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

A Case Study of Supply Chain Sustainability in the Electric Power Industry  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute's (EPRI's) Energy Sustainability Interest Group, consisting of approximately 30 electric power companies, is working to identify best practices in order to improve sustainability performance in the electric power industry. One component of a comprehensive approach toward meeting this objective is to work with the industry’s non-fuel supply chain to improve the environmental performance of producing and delivering their products and services. Many corporations and par...

2012-05-14T23:59:59.000Z

482

Power Quality Analysis of On-Board Plug-in Electric Vehicle Chargers  

Science Conference Proceedings (OSTI)

As society begins to pay more attention to energy efficiency and alternate forms of transportation, plug in electric vehicles (PEVs) are likely to become more prevalent as car manufacturers turn toward this technology. Before widespread adoption of PEV charging can occur, the impacts of these chargers must be evaluated. Electric utilities and Electric Power Research Institute (EPRI) are working together to test both on-board and off-board systems with respect to system loading, transformer life, and powe...

2011-12-30T23:59:59.000Z

483

Environmental Assessment of Plug-In Hybrid Electric Vehicles, Volume 3: California Assessment Report  

Science Conference Proceedings (OSTI)

National interest in electric transportation, particularly plug-in hybrid electric vehicles (PHEVs), has increased dramatically in recent years. Much of this interest is based on the potential of PHEVs to reduce petroleum consumption, reduce greenhouse gases, and improve air quality. The Electric Power Research Institute (EPRI) previously conducted a detailed assessment of the impacts on air quality and greenhouse gas emissions if significant numbers of Americans drove cars that were fueled by the power ...

2009-09-30T23:59:59.000Z

484

electricity supply | OpenEI  

Open Energy Info (EERE)

supply supply Dataset Summary Description The National Renewable Energy Laboratory (NREL) publishes a wide selection of data and statistics on energy power technologies from a variety of sources (e.g. EIA, Oak Ridge National Laboratory, Sandia National Laboratory, EPRI and AWEA). In 2006, NREL published the 4th edition, presenting, among other things, data on the U.S. electricity supply. Source NREL Date Released March 05th, 2006 (8 years ago) Date Updated Unknown Keywords electricity supply NREL Data application/vnd.ms-excel icon Electricity Supply (13 worksheets) (xls, 1.2 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment

485

Transportation Statistics Analysis for Electric Transportation  

Science Conference Proceedings (OSTI)

Plug-in Electric Vehicles (PEVs) are still in the initial stages of deployment in the American vehicle market. Much of the currently available data on PEVs is from special applications and early adopters. EPRI has analyzed existing transportation data on conventional vehicles from the National Household Travel Survey (NHTS) to study the potential long-term patterns of PEV use. This study used the NHTS data to investigate several aspects of potential PEV usage patterns and their effects on U.S. electric l...

2011-12-21T23:59:59.000Z

486

Electrical engineering Electricity  

E-Print Network (OSTI)

generation Transmission Distribution · Electrical generators · Electric motors · High voltage engineering associated with the systems Electrical engineering · Electric power generation Transmission Distribution The electricity transported to load locations from a power station transmission subsystem The transmission system

Ã?nay, Devrim

487

ESS 2012 Peer Review - DOE-EPRI Energy Storage Handbook in Collaborati...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Abbas Akhil Dr. Imre Gyuk and the Department of Energy's Office of Electricity Delivery & Energy Reliability support is gratefully acknowledged. Electricity Storage Handbook ...

488

Electricity Subsector Cybersecurity Capability Maturity Model...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

with the Department of Homeland Security (DHS) and involved close collaboration with industry, other Federal agencies, and other stakeholders. Electricity Subsector...

489

Plug-in Hybrid Electric Bus Demonstration: Long Island, New York  

Science Conference Proceedings (OSTI)

Initiated in 2003, this plug-in hybrid electric vehicle (PHEV) bus program has three major phases: Odyne/EPRI Design and Build Phases coupled with Odyne/Long Island Power Authority (LIPA) Demonstration Phase. This interim report describes completion of an initial demonstration with Long Island Bus (LI Bus) Mass Transit Authority (MTA).

2008-10-21T23:59:59.000Z

490

Developing and Implementing a Company-Wide Waste Accounting System at Public Service Electric & Gas  

Science Conference Proceedings (OSTI)

Waste accounting systems will enable utilities to track their recycling, reuse, and prevention efforts. This manual describes the implementation of EPRI's waste accounting method in support of Public Service Electric & Gas Company's pollution prevention efforts. This method provided a means for organizing information from many facilities, transmitting regular performance reports to facility personnel and management, and identifying opportunities for improving pollution prevention performance.

1998-05-04T23:59:59.000Z

491

Program on Technology Innovation: Nanotechnology Opportunities for the Electric Utility Enterprise  

Science Conference Proceedings (OSTI)

Nanotechnology promises to enable critical applications for the electric power industry. This report assesses the possibilities and relative importance of nanotechnology in the areas of photovoltaics, thermoelectrics, structural materials, sensors and networks, fuel cells, and catalysts and begins the discussion of the role that EPRI should play in the development and implementation of nanotechnology applications.

2005-11-17T23:59:59.000Z

492

Oconee Electrical Component Integrated Plant Assessment and Time Limited Aging Analyses for License Renewal: Revision 1  

Science Conference Proceedings (OSTI)

Duke Power Co. and Baltimore Gas and Electric Co. were the first two utilities to apply for and obtain license renewal for their nuclear units. This report is one in a series of EPRI reports providing the technical basis for the Oconee and Calvert Cliffs License Renewal Applications.

2000-08-10T23:59:59.000Z

493

The Effect on Electricity Consumption of the Commonwealth Edison Customer Application Program Pilot: Phase 1, Appendices  

Science Conference Proceedings (OSTI)

This report provides appendices that support Electric Power Research Institute (EPRI) report 1022703, which describes the Phase 1 analysis of some aspects of residential customers' response to Commonwealth Edison's Customer Application Plan (CAP). This report contains technical materials that describe in detail all of the methods employed in conducting the Phase 1 analysis and presents the results of the application of those methods.

2011-04-29T23:59:59.000Z

494

Cooperating Agencies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cooperating Agencies Cooperating Agencies Cooperating Agencies Selected documents on the topic of Cooperating Agencies under NEPA. December 23, 2004 Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act The purpose of this Council on Environmental Quality Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA). January 30, 2002 Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act The purpose of this Council on Environmental Quality Memorandum is to ensure that all Federal agencies are actively considering the designation

495

Plug-in Hybrid Electric Vehicle Evaluation and Test Data Analysis  

Science Conference Proceedings (OSTI)

In 2003, EPRI and DaimlerChrysler initiated a three-part collaborative effort to 1) develop and demonstrate a plug-in hybrid electric vehicle (PHEV) based on the Sprinter vehicle platform, 2) deliver prototype Sprinter PHEVs to fleets within the United States, and 3) explore these benefits in the context of commercial fleet use. As part of this effort, EPRI assumed the responsibility of managing data acquisition and analysis. This report focuses on evaluation of the PHEV Sprinter tested by the South Coas...

2009-12-07T23:59:59.000Z

496

Total Cost of Ownership for Current Plug-in Electric Vehicles: Fall 2013 Update  

Science Conference Proceedings (OSTI)

Dramatic growth over the last three years in the plug-in electric vehicle (PEV) market has resulted in many unanswered questions concerning total cost of ownership (TCO). In June 2013, EPRI released a public study that presented a new way of analyzing driving data for the purpose of calculating TCO for PEV ownership (EPRI report 3002001728). That study—which focused on the 2013 Chevrolet Volt and 2013 Nissan LEAF—used a full year’s worth of driving data to calculate the TCO of ...

2013-12-06T23:59:59.000Z

497

Electric Utilities' Role in Industrial Competitiveness: Going Beyond the Energy Audit  

E-Print Network (OSTI)

This paper describes EPRI's Partnership for Industrial Competitiveness. The Partnership, comprised of over 15 EPRI member utllities, was established to help electric utilities identify, develop; and implement competitiveness improvement opportunities for their industrial customers. To be meaningful, strategies for increasing industrial competitiveness must consider not only energy use, but also all other production inputs. To this end, the program focusses on three major areas: productivity, environmental protection, and efficiency. The effectiveness of the program will be gauged by its ability to keep utility customers "alive and well."

Jeffress, R. D.

1993-03-01T23:59:59.000Z

498

Electric power monthly, March 1995  

SciTech Connect

This report for March 1995, presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

1995-03-20T23:59:59.000Z

499

Agency Financial Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Financial Report Financial Report Fiscal Year 2010 D E/ -00 O CF 56 Foreword Agency Financial Report (AFR) The AFR is organized by the following three major sections: „ Management's Discussion and Analysis section provides executive-level information on the Department's history, mission, organization, Secretarial priorities, analysis of financial statements, systems, controls and legal compliance and other management priorities facing the Department. „ Financial Results section provides a Message from the Chief Financial Officer,

500

National Security Agency  

E-Print Network (OSTI)

The governmentattic.org web site (“the site”) is noncommercial and free to the public. The site and materials made available on the site, such as this file, are for reference only. The governmentattic.org web site and its principals have made every effort to make this information as complete and as accurate as possible, however, there may be mistakes and omissions, both typographical and in content. The governmentattic.org web site and its principals shall have neither liability nor responsibility to any person or entity with respect to any loss or damage caused, or alleged to have been caused, directly or indirectly, by the information provided on the governmentattic.org web site or in this file. The public records published on the site were obtained from government agencies using proper legal channels. Each document is identified as to the source. Any concerns about the contents of the site should be directed to the agency originating the document in question. GovernmentAttic.org is not responsible for the contents of documents published on the website. NATIONAL SECURITY AGENCY

unknown authors

2011-01-01T23:59:59.000Z