Powered by Deep Web Technologies
Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Estimation theoretical image restoration  

E-Print Network (OSTI)

In this thesis, we have developed an extensive study to evaluate image restoration from a single image, colored or monochromatic. Using a mixture of Gaussian and Poisson noise process, we derived an objective function to ...

Dolne, Jean J

2008-01-01T23:59:59.000Z

2

Cost Estimating Handbook for Environmental Restoration  

Science Conference Proceedings (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

3

Site restoration: Estimation of attributable costs from plutonium-dispersal accidents  

SciTech Connect

A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response.

Chanin, D.I.; Murfin, W.B. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States)

1996-05-01T23:59:59.000Z

4

Land Use Affects on Modern Bankfull Hydraulic Geometry in Southwest Ohio and its Implications for Stream Restoration.  

E-Print Network (OSTI)

??Channel morphology is affected by land use change nationwide. In Southwest Ohio, streams are influenced by agricultural and urban landscapes. The purpose of this study… (more)

Ellison, Elizabeth J.

2010-01-01T23:59:59.000Z

5

Improving recto document side restoration with an estimation of the verso side from a single scanned page  

E-Print Network (OSTI)

and L. Bedini. Independent component analysis for document restoration. I.J. on Doc. Anal. and Rec., 7(1):17­27, 2004. [15] A. Tonazzini, E. Salerno, and L. Bedini. Fast correction of bleed-through distortion. [16] A. Tonazzini, S. Vezzosi, and L. Bedini. Analysis and recognition of highly degraded printed

Wolf, Christian

6

Improving the estimation of Kendall's tau when censoring affects only one of the variables  

Science Conference Proceedings (OSTI)

This paper considers the estimation of Kendall's tau for bivariate data (X,Y) when only Y is subject to right-censoring. Although @t is estimable under weak regularity conditions, the estimators proposed by Brown et al. [1974. Nonparametric tests of ... Keywords: Censoring, Conditional distribution, Copula, Covariate, Generalized Kaplan-Meier estimator, Kendall's tau, Lifetime data

David Beaudoin; Thierry Duchesne; Christian Genest

2007-08-01T23:59:59.000Z

7

Estimating Contemporary and Future Wind-Damage Losses from Hurricanes Affecting Eglin Air Force Base, Florida  

Science Conference Proceedings (OSTI)

The strongest hurricanes over the North Atlantic Ocean are getting stronger, with the increase related to rising ocean temperature. Here, the authors develop a procedure for estimating future wind losses from hurricanes and apply it to Eglin Air ...

James B. Elsner; Shawn W. Lewers; Jill C. Malmstadt; Thomas H. Jagger

2011-07-01T23:59:59.000Z

8

prairie restoration  

NLE Websites -- All DOE Office Websites (Extended Search)

Amount of Seed Amount of Seed Before you can restore your parcel, you must obtain seed. The amount of seed you will need is directly related to the size of your parcel. When our school did its restoration, the area available to us was a bit larger than a full sized tennis court, about 15 meters by 40 meters. When seed was spread, each square meter of soil needed, by volume, about 500 cubic centimeters of seed to cover it adequately. This is roughly equivalent to a full 8-ounce plastic cup of seed for each square meter quadrat.(A quadrat is a term used in field studies meaning a measured off square of conveniently sized dimensions.) All together the total amount of prairie matrix (a mixture of all types of prairie seeds) we needed, fit easily into about 2 large plastic trash can liners (30-gallon size). For another

9

The cost of wetland creation and restoration. Final report  

SciTech Connect

This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

King, D.; Bohlen, C.

1995-08-01T23:59:59.000Z

10

Environmental Security and Restoration [EVS Program Area]  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Security and Restoration Environmental Security and Restoration EVS focuses on environmental and human health aspects of homeland and national security, as well as restoration of sites contaminated with hazardous materials. Contamination in our environment - in air, water, and soil - contributes to health problems and affects the quality of our lives. The EVS Division confronts this challenge by addressing environmental and human health aspects of homeland and national security and by characterizing and restoring sites contaminated with hazardous materials. We integrate extensive expertise in engineering, health physics, hydrogeology, environmental science, chemistry, spatial analysis, database management, and computer programming to contribute to environmental security and restoration.

11

Design and Analysis of Salmonid Tagging Studies in the Columbia Basin : Evaluating Wetland Restoration Projects in the Columbia River Estuary using Hydroacoustic Telemetry Arrays to Estimate Movement, Survival, and Residence Times of Juvenile Salmonids, Volume XXII (22).  

DOE Green Energy (OSTI)

Wetlands in the Columbia River estuary are actively being restored by reconnecting these habitats to the estuary, making more wetland habitats available to rearing and migrating juvenile salmon. Concurrently, thousands of acoustically tagged juvenile salmonids are released into the Columbia River to estimate their survival as they migrate through the estuary. Here, we develop a release-recapture model that makes use of these tagged fish to measure the success of wetland restoration projects in terms of their contribution to populations of juvenile salmon. Specifically, our model estimates the fraction of the population that enter the wetland, survival within the wetland, and the mean residence time of fish within the wetland. Furthermore, survival in mainstem Columbia River downstream of the wetland can be compared between fish that remained the mainstem and entered the wetland. These conditional survival estimates provide a means of testing whether the wetland improves the subsequent survival of juvenile salmon by fostering growth or improving their condition. Implementing such a study requires little additional cost because it takes advantage of fish already released to estimate survival through the estuary. Thus, such a study extracts the maximum information at minimum cost from research projects that typically cost millions of dollars annually.

Perry, Russell W.; Skalski, John R.

2008-08-01T23:59:59.000Z

12

Metric Selection for Ecosystem Restoration  

E-Print Network (OSTI)

managers identify the best metrics to evaluate and select the recommended restoration plan, monitor and assess progress toward achieving project objectives, and, if necessary, inform adaptive management decisions. Performance metrics, or measurable system components used to estimate and track the state of critical aspects of the project, are often the basis for project decision making and furthering scientific understanding. As such, ecosystem restoration planners should take time to carefully select an appropriate and effective metric set. To help planners with this task, this technical note accomplishes the following: 1. Reviews current USACE ecosystem restoration planning and monitoring policy, regulations and guidelines. 2. Explains the importance of metric selection and its roles during planning and post-construction monitoring and assessment. 3. Reviews common options for identifying and selecting metrics including conceptual modeling, historical precedence, and best professional judgment. 4. Presents two metric evaluation methods, screening and multi-criteria decision analysis. 5. Discusses metric application to ecosystem restoration project planning and monitoring.

Matteo Convertino; Kelsie Baker; Connie Lu; John T. Vogel; Kyle Mckay; Igor Linkov

2013-01-01T23:59:59.000Z

13

Past Restoration Fund Info  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates > Past Restoration Rates > Past Restoration Fund Info Past Restoration Fund Info FY 2013 Restoration Fund SNR Letter to Customers Regarding Revision to FY13 Restoration Fund Obligation Mid-Year Adjustment (June 19, 2013) (PDF - 1146 KB) SNR Letter to Customers Regarding FY13 Restoration Fund Obligation Mid-Year Adjustment (April 15, 2013) (PDF - 829 KB) SNR Letter to Customers Regarding Restoration Fund Obligations for FY 2013 (August 8, 2012) (PDF - 325 KB) FY 2012 Restoration Fund SNR Letter to Customers Regarding Restoration Fund Obligations for FY 2012 (August 9, 2011) (PDF - 340 KB) Mid Year Adjustment to the FY 2012 Restoration Fund Payment (April 18, 2012) (PDF - 174 KB) FY 2011 Restoration Fund SNR Letter to Customers Regarding Restoration Fund Obligations for FY 2011 (August 20, 2010) (PDF - 705 KB)

14

Native Grass Restoration Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Reader pdf format) on the Oak Ridge Reservation. Native Grass Restoration Projects Power Line Right-of-Way Roadside Re-Vegetation Riparian Restoration SNS Entrance Habitat...

15

The cost of wetland creation and restoration. Final report, [February 12, 1992--April 30, 1994]- Draft  

SciTech Connect

This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

King, D.; Costanza, R.

1994-07-11T23:59:59.000Z

16

Watershed Restoration Project  

DOE Green Energy (OSTI)

In 2003, the U.S. Department of Energy issued the Eastern Nevada Landscape Coalition (ENLC) funding to implement ecological restoration in Gleason Creek and Smith Valley Watersheds. This project was made possible by congressionally directed funding that was provided through the US Department of Energy, Energy Efficiency and Renewable Energy, Office of the Biomass Program. The Ely District Bureau of Land Management (Ely BLM) manages these watersheds and considers them priority areas within the Ely BLM district. These three entities collaborated to address the issues and concerns of Gleason Creek and Smith Valley and prepared a restoration plan to improve the watersheds’ ecological health and resiliency. The restoration process began with watershed-scale vegetation assessments and state and transition models to focus on restoration sites. Design and implementation of restoration treatments ensued and were completed in January 2007. This report describes the restoration process ENLC undertook from planning to implementation of two watersheds in semi-arid Eastern Nevada.

Julie Thompson; Betsy Macfarlan

2007-09-27T23:59:59.000Z

17

Fuzzy rule-based methodology for residential load behaviour forecasting during power systems restoration  

Science Conference Proceedings (OSTI)

Inadequate load pickup during power system restoration can lead to overload and underfrequency conditions, and even restart the blackout process, due to thermal energy losses. Thus, load behaviour estimation during restoration is desirable to avoid inadequate ... Keywords: artificial intelligence, energy management systems, fuzzy logic, load behaviour estimation, power system distribution, power system restoration, residential load forecasting, thermostatically controlled loads

Lia Toledo Moreira Mota; Alexandre Assis Mota; Andre Luiz Morelato Franca

2005-04-01T23:59:59.000Z

18

A neural architecture for fully data driven edge-preserving image restoration  

Science Conference Proceedings (OSTI)

This paper proposes a neural architecture, based on two Hopfield nets interconnected with a Boltzmann Machine, for a completely data driven edge-preserving restoration of blurred and noisy images. Solving this restoration problem entails the joint estimation ...

Luigi Bedini; Anna Tonazzini; Salvatore Minutoli

2000-01-01T23:59:59.000Z

19

Argonne Software Licensing: RESTORE - ANL  

RESTORE. RESTORE is a program management tool that permits the modeling of a required complex set of steps, including time, or costs, to accomplish the repair of a ...

20

Constraint and Restoring Force  

E-Print Network (OSTI)

Long-lived sensor network applications must be able to self-repair and adapt to changing demands. We introduce a new approach for doing so: Constraint and Restoring Force. CRF is a physics-inspired framework for computing ...

Beal, Jacob

2007-08-24T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

prairie restoration index  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose Purpose This is the first section of a "How to" guide designed for those individuals interested in restoring an area of land back to native prairie. To better facilitate your search for specific information, select one or all of the main topics associated with prairie parcel restoration listed below. Index History/Introduction of Prairie Restoration Selecting a Site Starting/Planning Seedbed Preparation. Seed (Amount, Acquiring and Preparation) Planting Watering General Identification (Grasses, Forbs, Flowers, Keeping Track) Burning - Enriching Reference Materials, Burning Permit and Seed Sources Information Identification Keys - Grasses and Forbs Illustrated Guide to Native Prairie Species Watch List for Native Prairie Plants This report was written by Lawrence Cwik as part of his participation in

22

Florida (Pensacola Beach) dune restoration Project General Project DescriPtion  

E-Print Network (OSTI)

Offset for the Florida Dune Restoration Project is 105 DSAYs. estiMateD cost The estimated cost for this project is approximately $644,487. (Estimated costs for some of the projects were updated from thoseFlorida (Pensacola Beach) dune restoration Project General Project DescriPtion The project

23

Definition: Reduced Restoration Cost | Open Energy Information  

Open Energy Info (EERE)

Restoration Cost Jump to: navigation, search Dictionary.png Reduced Restoration Cost The functions that provide this benefit lead to fewer outages andor help restore power quicker...

24

Adaptive wiener image restoration kernel  

DOE Patents (OSTI)

A method and device for restoration of electro-optical image data using an adaptive Wiener filter begins with constructing imaging system Optical Transfer Function, and the Fourier Transformations of the noise and the image. A spatial representation of the imaged object is restored by spatial convolution of the image using a Wiener restoration kernel.

Yuan, Ding (Henderson, NV)

2007-06-05T23:59:59.000Z

25

MOUND Environmental Restoration Program  

Office of Legacy Management (LM)

MOUND MOUND Environmental Restoration Program ._. I s ! I " ' Al /. i i : MOUND Environmental Restoration Program VlOUND I MOUND PLANT POTENTIAL RELEASE SITE PACKAGE Notice of Public Review Period hgram The following potential release site (PRS) packages will be available for public review ir he CERCLA Public Reading Room, 305 E. Central Ave., Miamisburg, Ohio beginning lune 17, 1997. Public comment will be accepted on these packages from June 17, 1997, .hrough July 18, 1997. PRS 30: Building 27 Propane Tank PRS 129/130: Former Solvent Storage Sites PRS 241: Soil Con@mination- - Main Hill Parking Lot Area PRS 307: Soil Contamination -.Buil.ding 29 PRS 318: PCB Tramformer and Capacitor Locations PRS 320-325: Former Sites -:Dayton Uqits 1-4/Dayton WarehousYScioto Facility

26

Water Resources Restoration and Preservation Act (Florida) |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Resources Restoration and Preservation Act (Florida) Water Resources Restoration and Preservation Act (Florida) Eligibility Agricultural Commercial Construction Developer...

27

FAQS Reference Guide – Environmental Restoration  

Energy.gov (U.S. Department of Energy (DOE))

This reference guide addresses the competency statements in the November 2002 edition of DOE-STD-1157-2002, Environmental Restoration Functional Area Qualification Standard.

28

prairie restoration plant ident  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant Identification Plant Identification Once your restoration is started and plants begin to germinate, the next issue you are faced with is the identification of what is growing. From my experience, the seeds you planted should start germinating after about a week to ten days. Of course, this is dependent on the weather conditions and the amount of moisture in the soil. If you are watering regularly, you will get growth much more quickly than if you are just waiting for nature to take its course. Identifying prairie plants as they germinate is very difficult. If you are an experienced botanist or an expert on prairie plants, your identification will still be a little more than an educated guess. In other words identifying prairie species from non-native species will take some time.

29

Former Sites Restoration. Division  

Office of Legacy Management (LM)

@j&s* **$r* :. .+:., @j&s* **$r* :. .+:., II' .,.. I .&i. , :"': T.1 . i *&+t&&., @i i -:.+; L I. * . . .p.isit-!'..r'ir~i _, +.&.., . I. :?I,?.* .L,! j?' aa&* pi 4 L', ..b,- ., .e /w.1( ,v_.c ~A&$?>*:, ,..:.' .1 > . . . . . *. ,.. .I., .( j .~.~:,;;,.".,Certificafion ,Dockef for The ;,il' t:i~>$:+-.. ~~y:Remeciial Action. Performed "' . ::;:cxcgt the @+zb Gate Site in . ;' ! ,Oak Ridge, Tennessee, 7.99 7- 7 992 -.. Department .of Energy Former Sites Restoration. Division . ,Oak Ridge Operations .Office _. February 7 994 @ Printed on recycledhcy&ble paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE ELZA GAP SITE IN OAK RIDGE, TENNESSEE, 1991-1992 FEBRUARY 1994 I Prepared for UNITED STATES DEPARTMENT OF ENERGY

30

COMPREHENSIVE EVERGLADES RESTORATION PLAN CENTRAL AND SOUTHERN FLORIDA PROJECT  

E-Print Network (OSTI)

with project goals and objectives, is estimated to have a total project first cost of $168,023,000 (amount does not include sunk Project Implementation Report costs), and annual costs associated with vegetation managementCOMPREHENSIVE EVERGLADES RESTORATION PLAN CENTRAL AND SOUTHERN FLORIDA PROJECT BISCAYNE BAY COASTAL

US Army Corps of Engineers

31

Industries Affected  

Science Conference Proceedings (OSTI)

Table 2   Industries affected by microbiologically influenced corrosion...generation: nuclear, hydro, fossil fuel,

32

Environmental Restoration Quality Program Plan. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

Colley, J.S.

1992-08-01T23:59:59.000Z

33

Environmental Restoration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maturity Maturity Value Target Score Maturity Value Target Score A1 Cost Estimate H 7.5 2 15.0 5 37.5 A2 Cost Risk/Contingency Analysis P 3.0 1 3.0 5 15.0 A3 Funding Requirements/Profile H 7.5 2 15.0 5 37.5 A4 Independent Cost Estimate/Schedule Review P 3.0 N/A 0.0 5 15.0 A5 Life Cycle Cost P 3.0 1 3.0 5 15.0 A6 Forecast of Cost at Completion P 3.0 N/A 0.0 5 15.0 A7 Cost Estimate for Next Phase Work Scope P 3.0 5 15.0 5 15.0 Subtotal Cost 51.0 150.0 B1 Project Schedule H 7.5 2 15.0 5 37.5 B2 Major Milestones P 3.0 2 6.0 5 15.0 B3 Resource Loading P 3.0 1 3.0 5 15.0 B4 Critical Path Management H 7.5 1 7.5 5 37.5 B5 Schedule Risk/Contingency Analysis P 3.0 1 3.0 5 15.0 B6 Forecast of Schedule Completion P 3.0 N/A 0.0 5 15.0 B7 Schedule for Next Phase Work Scope P 3.0 5 15.0 5 15.0 Subtotal Schedule 49.5 150.0 C1 Preliminary Assessments/Site Investigation P 2.5 5 12.5 5 12.5 C2

34

Environmental Restoration Quality Program Plan  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

Colley, J.S.

1992-08-01T23:59:59.000Z

35

A neural architecture for simultaneous MAP image restoration and MLestimation of edge-preserving Gibbs priors  

Science Conference Proceedings (OSTI)

This paper proposes an iterative procedure that simultaneously computes the MAP restoration of an image and the ML estimation of the unknown model parameters, when piecewise smooth MRF models with an explicit, constrained line process are considered. ...

Luigi Bedini; Anna Tonazzini; Salvatore Minutoli

1996-12-01T23:59:59.000Z

36

Marsh Island (PortersvIlle Bay) restoratIon Project General Project DescriPtion  

E-Print Network (OSTI)

spill. Total estimated Offsets for the Marsh Island Project are 540 DSAYs. estiMated cost: Construction of the Marsh Island Project would cost approximately $11,280,000. (Estimated costs for some of the projectsMarsh Island (PortersvIlle Bay) restoratIon Project General Project DescriPtion The Marsh Island

37

Data management for environmental restoration  

SciTech Connect

The mission for data management for the Environmental Restoration Department (ERD) at the Idaho National Engineering Laboratory (INEL), is to deliver quality assured data for decision making. Data management must meet regulatory requirements by developing appropriate technical capabilities. This paper describes the requirements and how they are being met at the INEL.

Yurman, D.J.

1992-08-01T23:59:59.000Z

38

Data management for environmental restoration  

SciTech Connect

The mission for data management for the Environmental Restoration Department (ERD) at the Idaho National Engineering Laboratory (INEL), is to deliver quality assured data for decision making. Data management must meet regulatory requirements by developing appropriate technical capabilities. This paper describes the requirements and how they are being met at the INEL.

Yurman, D.J.

1992-01-01T23:59:59.000Z

39

Evaluate the Restoration Potential of Snake River Fall Chinook Salmon Spawning Habitat, Status Report 2006.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) Project 2003-038-00, Evaluate the restoration potential of Snake River fall Chinook salmon spawning habitat, began in FY04 (15 December 2003) and continues into FY06. This status report is intended to summarize accomplishments during FY04 and FY05. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). This project evaluates the restoration potential of mainstem habitats for fall Chinook salmon. The studies address two research questions: 'Are there sections not currently used by spawning fall Chinook salmon within the impounded lower Snake River that possess the physical characteristics for potentially suitable fall Chinook spawning habitat?' and 'Can hydrosystem operations affecting these sections be adjusted such that the sections closely resemble the physical characteristics of current fall Chinook salmon spawning areas in similar physical settings?' Efforts are focused at two study sites: (1) the Ice Harbor Dam tailrace downstream to the Columbia River confluence, and (2) the Lower Granite Dam tailrace. Our previous studies indicated that these two areas have the highest potential for restoring Snake River fall Chinook salmon spawning habitat. The study sites will be evaluated under existing structural configurations at the dams (i.e., without partial removal of a dam structure), and alternative operational scenarios (e.g., varying forebay/tailwater elevations). The areas studied represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We are using a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats is the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Escapement estimates for fall of 2000 indicate more than 9000 adult fall Chinook salmon returned to this area, accounting for more than 2100 redds within a 5 km section of river.

Hanrahan, T.P. [Pacific Northwest National Laboratory

2009-01-08T23:59:59.000Z

40

Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program  

SciTech Connect

The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

1992-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Environmental Restoration Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plan Environmental Restoration Strategic Plan, remediating the Nuclear Weapons Complex, August 1995, environmentalrestorationstrategicplan.pdf Environmental...

42

Louisiana Coastal Area, Louisiana Ecosystem Restoration  

E-Print Network (OSTI)

1 Louisiana Coastal Area, Louisiana Ecosystem Restoration Six Projects Authorized by Section 7006(e for the Louisiana Coastal Area, dated January 31, 2005, (hereinafter referred to as the "restoration plan"), described a program to address the most critical restoration needs to reduce the severe wetland losses

US Army Corps of Engineers

43

Secretary Bodman Signs Order to Help Restore Electricity to East Texas More  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order to Help Restore Electricity to East Order to Help Restore Electricity to East Texas More Quickly Secretary Bodman Signs Order to Help Restore Electricity to East Texas More Quickly September 28, 2005 - 10:58am Addthis WASHINGTON, DC - U.S. Department of Energy Secretary Samuel W. Bodman today signed an order to authorize and direct CenterPoint Energy to temporarily connect and restore power to Entergy Gulf States, Inc. This action will allow thousands of Entergy customers to receive electricity while Entergy Gulf States, Inc., rebuilds its electricity transmission and distribution infrastructure. "In the aftermath of any disaster, it's critically important that we work together to restore life-saving and life-sustaining electricity to those people affected by the storm. By issuing this order, we make it possible

44

FAQS Qualification Card - Environmental Restoration | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Restoration Environmental Restoration FAQS Qualification Card - Environmental Restoration A key element for the Department's Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA). For each functional area, the FAQS identify the minimum technical competencies and supporting knowledge and skills for a typical qualified individual working in the area. FAQC-EnvironmentalRestoration.docx Description Environmental Restoration Qualification Card More Documents & Publications FAQS Qualification Card - General Technical Base

45

Development of Power System Restoration Tool Based on Generic Restoration Milestones  

Science Conference Proceedings (OSTI)

The importance of power system restoration is well recognized by the power industry. System reliability depends heavily on the efficiency of system restoration. EPRI has been working on developing a prototype decision support tool, the System Restoration Navigator (SRN), for evaluating system restoration strategies, based on the concept of Generic Restoration Milestones (GRMs). This tool is intended to be used for offline planning at the current stage and later on for dispatcher training and online decis...

2010-12-22T23:59:59.000Z

46

ENVIRONMENTAL RESTORATION QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Qualification Standard Reference Guide NOVEMBER 2009 i Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

47

Environmental Security and Restoration | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Security & Restoration Environmental Security & Restoration Argonne's work in environmental security and restoration addresses soil, surface water, sediment, and groundwater at contaminated sites. Argonne's work in environmental restoration addresses soil, surface water, sediment, and groundwater at contaminated sites, starting with environmental evaluations and planning projects. Assessments are also conducted of approaches for long-term stewardship of remediated sites with residual contamination. Remedies range from precise excavations to innovative combinations of engineered wetlands and phytoremediation. Argonne researchers conduct approaches for long-term stewardship of remediated sites with residual contamination. The objective of environmental security programs is to support efforts to reduce national

48

Small Business Issues for Environmental Restoration Acquisitions  

Energy.gov (U.S. Department of Energy (DOE))

Small Business Issues for Environmental Restoration Acquisitions The Department of Energy’s best practices to reduce and eliminate barriers to small businesses entering into prime contracts for...

49

Groundwater Projects, Environmental Restoration Division, ERD...  

NLE Websites -- All DOE Office Websites (Extended Search)

OU I, IV, V, and VI also address groundwater contamination. The BNL Groundwater Status Report is an annual comprehensive summary of data collected from environmental restoration...

50

Environmental restoration and statistics: Issues and needs  

Science Conference Proceedings (OSTI)

Statisticians have a vital role to play in environmental restoration (ER) activities. One facet of that role is to point out where additional work is needed to develop statistical sampling plans and data analyses that meet the needs of ER. This paper is an attempt to show where statistics fits into the ER process. The statistician, as member of the ER planning team, works collaboratively with the team to develop the site characterization sampling design, so that data of the quality and quantity required by the specified data quality objectives (DQOs) are obtained. At the same time, the statistician works with the rest of the planning team to design and implement, when appropriate, the observational approach to streamline the ER process and reduce costs. The statistician will also provide the expertise needed to select or develop appropriate tools for statistical analysis that are suited for problems that are common to waste-site data. These data problems include highly heterogeneous waste forms, large variability in concentrations over space, correlated data, data that do not have a normal (Gaussian) distribution, and measurements below detection limits. Other problems include environmental transport and risk models that yield highly uncertain predictions, and the need to effectively communicate to the public highly technical information, such as sampling plans, site characterization data, statistical analysis results, and risk estimates. Even though some statistical analysis methods are available off the shelf'' for use in ER, these problems require the development of additional statistical tools, as discussed in this paper. 29 refs.

Gilbert, R.O.

1991-10-01T23:59:59.000Z

51

Waste Generation Forecast for DOE-ORO`s Environmental Restoration OR-1 Project: FY 1994--FY 2001. Environmental Restoration Program, September 1993 Revision  

Science Conference Proceedings (OSTI)

This Waste Generation Forecast for DOE-ORO`s Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993.

Not Available

1993-12-01T23:59:59.000Z

52

Independent component analysis for document restoration  

Science Conference Proceedings (OSTI)

We propose a novel approach to restoring digital document images, with the aim of improving text legibility and OCR performance. These are often compromised by the presence of artifacts in the background, derived from many kinds of degradations, such ... Keywords: Blind source separation, Degraded documents, Independent component analysis, Palimpsest restoration- Bleed-through cancellation

Anna Tonazzini; Luigi Bedini; Emanuele Salerno

2004-03-01T23:59:59.000Z

53

EIS-0425: Mid-Columbia Coho Restoration, Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25: Mid-Columbia Coho Restoration, Washington 25: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

54

EIS-0425: Mid-Columbia Coho Restoration, Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0425: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

55

Hurricane Response and Restoration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hurricane Response and Restoration Hurricane Response and Restoration Hurricane Response and Restoration June 1, 2011 - 5:15pm Addthis Despite all of ISER's efforts to promote reliability and resiliency in the energy sector, domestic and global events will occur that will disrupt the sector and ISER must always be prepared to respond. In the face of both manmade and natural disasters, ISER applies cutting edge technical solutions and emergency management expertise to help overcome challenges inherent in quickly restoring an incredibly complex U.S. energy system. ISER plans, trains, and coordinates year round with all relevant stakeholders so that it can meet our nation's energy needs by deploying energy emergency responders to coordinate and facilitate system restoration activities with local, state, territorial, Federal, public and private

56

Response and Restoration | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Restoration Restoration Response and Restoration Despite all of ISER's efforts to promote reliability and resiliency in the energy sector, domestic and global events will occur that will disrupt the sector and ISER must always be prepared to respond. In the face of both manmade and natural disasters, ISER applies cutting edge technical solutions and emergency management expertise to help overcome challenges inherent in quickly restoring an incredibly complex U.S. energy system. ISER plans, trains, and coordinates year round with all relevant stakeholders so that it can meet our nation's energy needs by deploying energy emergency responders to coordinate and facilitate system restoration activities with local, state, territorial, Federal, public and private sector stakeholders, in some cases, coordinating the utilization of certain

57

Restoration Tax Abatement (Louisiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Tax Abatement (Louisiana) Restoration Tax Abatement (Louisiana) Restoration Tax Abatement (Louisiana) < Back Eligibility Commercial Low-Income Residential Multi-Family Residential Residential Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Wind Program Info State Louisiana Program Type Property Tax Incentive Provider Louisiana Economic Development Restoration Tax Abatement (RTA) Program provides five-year property tax abatement for the expansion, restoration, improvement, and development of existing commercial structures and owner-occupied residences. The program grants a five-year deferred assessment of the ad valorem property taxes on renovations and improvements. Equipment that becomes an integral part of the structure can qualify for this exemption. The structure must be located

58

Environmental Restoration Disposal Facility (Project W-296) Safety Assessment  

SciTech Connect

This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

Armstrong, D.L.

1994-08-01T23:59:59.000Z

59

Restoration and History: The Search for a Usable Environmental Past  

E-Print Network (OSTI)

Review: Restoration and History: The Search for a UsableEd). Restoration and History: The Search for a Usable87176-1. Restoration and History: The Search for a Usable

Mathoor, Vineeth

2011-01-01T23:59:59.000Z

60

Comprehensive Everglades Restoration Plan Regulation Act (Florida) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comprehensive Everglades Restoration Plan Regulation Act (Florida) Comprehensive Everglades Restoration Plan Regulation Act (Florida) Comprehensive Everglades Restoration Plan Regulation Act (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Multi-Family Residential Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Environmental Regulations Siting and Permitting Provider Florida Department of Environmental Protection

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EA-1969: Clark Fork River Delta Restoration Project, Bonner County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho Summary Bonneville Power...

62

Wild Life Restoration in the Forest Preserves  

NLE Websites -- All DOE Office Websites (Extended Search)

Life Restoration in the Forest Preserves Life Restoration in the Forest Preserves Nature Bulletin No. 613 October 15, 1960 Forest Preserve District of Cook County Daniel Ryan, President Roberts Mann, Conservation Editor David H. Thompson, Senior Naturalist WILD LIFE RESTORATION IN THE FOREST PRESERVES The wealth of wildlife in the Cook County forest preserves rivals that in any of the other 101 Illinois counties, in spite of the fact that over half of the state's people are crowded within its boundaries. The large variety of birds, mammals and other animal life now in this county is possible largely because the Forest Preserve District protects their natural habitats, including many that have been restored. These include timbered rolling uplands, wooded stream valleys, prairie remnants, sand flats, marshes, and a hundred bodies of water. Protection, for as much as forty years, against fire, hunting, trapping and other destruction has allowed the natural comeback of these habitats and the build-up of wildlife populations.

63

Environmental Restoration Program Management Control Plan  

SciTech Connect

This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

1991-09-01T23:59:59.000Z

64

Automated Regularization Parameter Selection in Multi-Scale Total Variation Models for Image Restoration  

Science Conference Proceedings (OSTI)

Multi-scale total variation models for image restoration are introduced. The models utilize a spatially dependent regularization parameter in order to enhance image regions containing details while still sufficiently smoothing homogeneous features. The ... Keywords: Hierarchical decomposition, Local variance estimator, Order statistics, Primal-dual method, Semismooth Newton method, Spatially dependent regularization parameter, Total variation regularization

Yiqiu Dong; Michael Hintermüller; M. Monserrat Rincon-Camacho

2011-05-01T23:59:59.000Z

65

Risk-based priority scoring for Brookhaven National Laboratory environmental restoration programs  

Science Conference Proceedings (OSTI)

This report describes the process of estimating the risk associated with environmental restoration programs under the Brookhaven National Laboratory Office of Environmental Restoration. The process was part of an effort across all Department of Energy facilities to provide a consistent framework to communicate risk information about the facilities to senior managers in the DOE Office of Environmental Management to foster understanding of risk activities across programs. the risk evaluation was a qualitative exercise. Categories considered included: Public health and safety; site personnel safety and health; compliance; mission impact; cost-effective risk management; environmental protection; inherent worker risk; environmental effects of clean-up; and social, cultural, political, and economic impacts.

Morris, S.C.; Meinhold, A.F.

1995-05-01T23:59:59.000Z

66

Site & Facility Restoration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Restoration Site & Facility Restoration Deactivation & Decommissioning (D&D) Deactivation and Decommissioning (D&D) is the process of taking an active/excess/abandoned facility to a final disposition end state. Because of residual radioactivity, other hazardous constituents, and the physical condition of EM's facilities, D&D presents unique hazards that must be addressed from a safety, programmatic, environmental, and technological standpoint. Read more Soil & Groundwater Remediation The U.S. Department of Energy (DOE) manages the largest groundwater and soil remediation effort in the world. The inventory at the DOE sites includes 6.5 trillion liters of contaminated groundwater, an amount equal to about four times the daily U.S. water consumption, and 40 million cubic

67

Environmental Restoration Information Resource Management Program Plan  

SciTech Connect

The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

Not Available

1994-09-01T23:59:59.000Z

68

Process for restoring membrane permeation properties  

DOE Patents (OSTI)

A process for restoring the selectivity of high-flee-volume, glassy polymer membranes for condensable components over less-condensable components or non-condensable components of a gas mixture. The process involves exposing the membrane to suitable sorbent vapor, such as propane or butane, thereby reopening the microvoids that make up the free volume. The selectivity of an aged membrane may be restored to 70-100% of its original value. The selectivity of a membrane which is known to age over time can also be maintained by keeping the membrane in a vapor environment when it is not in use.

Pinnau, Ingo (Palo Alto, CA); Toy, Lora G. (San Francisco, CA); Casillas, Carlos G. (San Jose, CA)

1997-05-20T23:59:59.000Z

69

Process for restoring membrane permeation properties  

DOE Patents (OSTI)

A process is described for restoring the selectivity of high-free-volume, glassy polymer membranes for condensable components over less-condensable components or non-condensable components of a gas mixture. The process involves exposing the membrane to suitable sorbent vapor, such as propane or butane, thereby reopening the microvoids that make up the free volume. The selectivity of an aged membrane may be restored to 70--100% of its original value. The selectivity of a membrane which is known to age over time can also be maintained by keeping the membrane in a vapor environment when it is not in use. 8 figs.

Pinnau, I.; Toy, L.G.; Casillas, C.G.

1997-05-20T23:59:59.000Z

70

Restoration of resaca wetlands and associated wet prairie habitats at Palo Alto Battlefield National Historic Site  

E-Print Network (OSTI)

Cultivation and drainage projects associated with livestock production have substantially disturbed resaca wetlands and wet prairie habitats in southern Texas. As a consequence of the anthropogenic disturbances, the area of these wetlands has been reduced and the ecological integrity of the remaining wetlands has been compromised. The goal of this study was to explore effective strategies for ecological restoration of coastal prairie and resaca ecosystems in south Texas and provide restoration recommendations to the National Park Service at Palo Alto Battlefield National Historic Site (NHS). Field experiments were conducted to evaluate the effectiveness of different approaches for restoring Spartina spartinae on disturbed saline flats. A resaca hydrologic study was initiated to evaluate the groundwater hydrology in disturbed versus undisturbed resaca wetlands and explore potential restoration strategies. Transplanting S. spartinae in the fall season was more successful (80% survivability) than seeding (0% initial establishment), spring transplanting (0% survival), spring and fall mechanical transplanting (0% and 6% survivability, respectively). Soil disturbance significantly affected (p < 0.05) survival of transplanted tillers and basal diameter of both the bare root and container-grown transplants in the fall manual treatments. The initial hydrologic study of the resaca wetlands found that vegetation rooting zone hydrology was likely dependent on surface water rather than groundwater. These findings suggest that strategies that restore surface hydrologic regimes will likely restore the ecosystem structure and function of disturbed resacas. Manually transplanting bare-root stock of S. spartinae in the late fall season without soil disturbance will increase the likelihood of successful saline flat restoration.

Margo, Michael Ray

2003-05-01T23:59:59.000Z

71

Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005  

DOE Green Energy (OSTI)

This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

2006-12-20T23:59:59.000Z

72

Method of restoring degraded solar cells  

DOE Patents (OSTI)

Amorphous silicon solar cells have been shown to have efficiencies which degrade as a result of long exposure to light. Annealing such cells in air at a temperature of about 200 C for at least 30 minutes restores their efficiency. 2 figs.

Staebler, D.L.

1983-02-01T23:59:59.000Z

73

Method of restoring degraded solar cells  

DOE Patents (OSTI)

Amorphous silicon solar cells have been shown to have efficiencies which degrade as a result of long exposure to light. Annealing such cells in air at a temperature of about 200.degree. C. for at least 30 minutes restores their efficiency.

Staebler, David L. (Lawrenceville, NJ)

1983-01-01T23:59:59.000Z

74

Scaling Restoration Projects for 316(b) Compliance  

Science Conference Proceedings (OSTI)

This report examines fish stocking as a restoration approach for offsetting impingement mortality and entrainment at power plant cooling water intake structures. It will provide information to industry, resource agencies, and non-governmental organizations involved in the 316(b) regulatory process.

2006-07-11T23:59:59.000Z

75

Willamette River Habitat Protection and Restoration Program  

E-Print Network (OSTI)

.............................................................................6 a. The Challenge of Restoration in a Large River/Flood Plain System.............6 b. The Need Goals: Anchor Habitats as Stepping Stones....................20 f. Measuring Results-purpose dams and reservoirs as part of the Federal Columbia River Power System, as well as 42 miles of bank

76

DARRP -Protecting and restoring natural resources nationwide Protecting and Restoring Natural Resources in Hawaii  

E-Print Network (OSTI)

(Kalaeloa) - see case highlights. Coral reef habitat obliter- ated by the M/V Cape Flattery Ship Grounding removed from reefs in Hawaii. Emergency restoration at Kalaeloa (Barbers Point) recementing 2800 dislodged

77

Final Strategic Plan Released by Gulf Coast Ecosystem Restoration Taskforce  

Energy.gov (U.S. Department of Energy (DOE))

Today (December 5) the Gulf Coast Ecosystem Restoration Task Force released its final strategy for long-term restoration in the Gulf, a path forward based on input from states, tribes, federal...

78

A Revised Force–Restore Model for Land Surface Modeling  

Science Conference Proceedings (OSTI)

To clarify the definition of the equation for the temperature toward which the soil skin temperature is restored, the prediction equations in the commonly used force–restore model for soil temperature are rederived from the heat conduction ...

Diandong Ren; Ming Xue

2004-11-01T23:59:59.000Z

79

Wetlands restoration panel worries over loss of money for monitoring  

E-Print Network (OSTI)

in the coal mine" for gauging the success of restoration programs. "We still need to do something," Scarpa

Belogay, Eugene A.

80

Notices Affected Public: Individuals and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 Federal Register 23 Federal Register / Vol. 76, No. 23 / Thursday, February 3, 2011 / Notices Affected Public: Individuals and households; not-for-profit institutions; State, Local, or Tribal Government, State Educational Agencies or Local Educational Agencies. Total Estimated Number of Annual Responses: 22,760. Total Estimated Number of Annual Burden Hours: 8,725. Abstract: The study is being conducted as part of the National Assessment of Title I, mandated by Title I, Part E, Section 1501 of the Elementary and Secondary Education Act. The study is designed to identify school programs and instructional practices associated with improved language development, background knowledge, and comprehension outcomes for children in prekindergarten through third grade. Analyses will estimate the

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Restoration of X-ray fluorescence images of hidden paintings  

Science Conference Proceedings (OSTI)

This paper describes our methods for repairing and restoring images of hidden paintings (paintings that have been painted over and are now covered by a new surface painting) that have been obtained via noninvasive X-ray fluorescence imaging of their ... Keywords: Art restoration, Artifact correction, Image restoration, Underdetermined source separation

Anila Anitha; Andrei Brasoveanu; Marco Duarte; Shannon Hughes; Ingrid Daubechies; Joris Dik; Koen Janssens; Matthias Alfeld

2013-03-01T23:59:59.000Z

82

Dynamic physical and economic modelling of riparian restoration options  

Science Conference Proceedings (OSTI)

A dynamic simulation framework is used to compare benefit-cost ratios of riparian restoration investment strategies to pursue ecosystem service benefits. The model is meant to be adaptable to generic restoration planning applications, with the Middle ... Keywords: Adaptive management, Benefit-cost analysis, Choice experiment, Dynamic simulation, Ecosystem service, Rio Grande, River restoration

Matthew A. Weber; Vincent C. Tidwell; Jennifer A. Thacher

2010-12-01T23:59:59.000Z

83

A unified method for optimizing linear image restoration filters  

Science Conference Proceedings (OSTI)

Image restoration from degraded images lies at the foundation of image processing, pattern recognition, and computer vision, so it has been extensively studied. A large number of image restoration filters have been devised so far. It is known that a ... Keywords: denoising, image restoration, linear filter, moving-average filter, subspace information criterion (SIC)

Masashi Sugiyama; Hidemitsu Ogawa

2002-11-01T23:59:59.000Z

84

Environmental Restoration Program Records Management Plan  

SciTech Connect

This document describes the plans, organization, and control systems to be used for management of the Hanford Site Environmental Restoration (ER) Program. The Field Office Management Plan (FOMP), in conjunction with the Environmental Restoration Program Quality Assurance System Requireme ts for the Hanford Site (QASR [DOE-RL 1992a]), provides requirements governing ER Program work activities on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (WHC) ER Program Office has developed this ER Program Records Management Plan to fulfill the requirements of the FOMP (DOE-RL 1989). This records management plan will enable the ER Program Office and other ER Program participants to identify, control, and maintain the records generated and used in support of the ER Program.

Montgomery, L.M.

1992-12-01T23:59:59.000Z

85

Environmental Restoration Quality Program Implementation Plan  

SciTech Connect

The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

1992-08-01T23:59:59.000Z

86

Big Canyon Creek Ecological Restoration Strategy.  

DOE Green Energy (OSTI)

He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality

Rasmussen, Lynn; Richardson, Shannon

2007-10-01T23:59:59.000Z

87

Big Canyon Creek Ecological Restoration Strategy.  

Science Conference Proceedings (OSTI)

He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality

Rasmussen, Lynn; Richardson, Shannon

2007-10-01T23:59:59.000Z

88

Lower Klickitat Riparian and In-channel Habitat Restoration Project, Annual Report 2001-2002.  

DOE Green Energy (OSTI)

This project focuses on the lower Klickitat River and its tributaries that provide or affect salmonid habitat. The overall goal is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of watersheds supporting anadromous fish production, particularly steelhead (Oncorhyncus mykiss) which are listed as 'Threatened' within the Mid-Columbia ESU. Restoration activities are aimed at restoring stream processes by removing or mitigating watershed perturbances and improving habitat conditions and water quality. In addition to steelhead, habitat improvements benefit Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout, and enhance habitat for many terrestrial and amphibian wildlife species. Protection activities compliment restoration efforts within the subbasin by securing refugia and preventing degradation. Since 90% of the project area is in private ownership, maximum effectiveness will be accomplished via cooperation with state, federal, tribal, and private entities. The project addresses goals and objectives presented in the Klickitat Subbasin Summary and the 1994 NWPPC Fish and Wildlife Program. Feedback from the 2000 Provincial Review process indicated a need for better information management to aid development of geographic priorities. Thus, an emphasis has been placed on database development and a review of existing information prior to pursuing more extensive implementation. Planning and design was initiated on several restoration projects. These priorities will be refined in future reports as the additional data is collected and analyzed. Tasks listed are for the April 1, 2001 to August 31, 2002 contract cycle, for which work was delayed during the summer of 2001 because the contract was not finalized until mid-August 2001. Accomplishments are provided for the September 1, 2001 to August 31, 2002 reporting period. During this reporting period, significant progress was made on acquisition and development of spatial data, monitoring of steelhead spawning, riparian revegetation, streamflow monitoring, completion of maintenance and repair work, completion of a working version of a habitat database, and completion of the Swale Creek assessment.

Conley, Will

2003-10-01T23:59:59.000Z

89

Strategic planning for power system restorations  

SciTech Connect

This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

Bent, Russell W [Los Alamos National Laboratory; Van Hententyck, Pascal [BROWN UNIV.; Coffrin, Carleton [BROWN UNIV.

2010-10-12T23:59:59.000Z

90

Studies on bottomland hardwood forest restoration and teaching with geographic information systems (GIS) in ecology labs  

E-Print Network (OSTI)

The development of graduate students in the sciences preparing for careers in academia has long included elements to advance students as science researchers, but recent emphasis is being placed on developing students as instructors and education researchers as well. As such, objectives of this study included assessments of seedling responses to hydrology typical of floods in urban settings, the role of created microtopography in community development of a bottomland hardwood forest, and the influence of geographic information systems (GIS) on student motivation and conceptual knowledge. Substantial losses of bottomlands in Texas necessitate restoration to regain the ecosystem services that they provide. Restoration of proper hydrology is the most important aspect of wetland restoration, but this can prove difficult in urbanizing environments where hydrology has been irreversibly altered. Microtopography has been shown to be an important component of bottomland hardwood forests, and its restoration may aid in hydrologic restoration as gradients are created that support a diverse community. Tree seedlings were subjected to experimental flooding regimes typical of floodplain forests in rural and urban settings. Growth rates of seedlings varied over time and differed depending on species and treatment. Created microtopography resulted in a spatially heterogeneous system similar to that of natural bottomlands and strongly influenced hydrology, soil properties, survival of planted seedlings, and abundance and distribution of colonizing species. Proper bottomland restoration in urbanizing environments should include species selection based on current and potential future hydrologic conditions. In addition, restoring microtopography may improve survival of a variety of species introduced during restoration, as well as enhance colonization of a diverse plant community under changing hydrologic regimes. Trends indicated a slight improvement in attitude and performance for students that used GIS. More important, the authenticity of the experience appeared to affect student attitude. The effective use of GIS in teaching may be scale-dependent. Smallscale phenomena may be assessed as easily in a field exercise as with GIS. Using GIS to assess large-scale, complex patterns may have a substantial impact on student understanding. Further studies are needed to determine direct benefits of teaching with GIS in undergraduate ecology classrooms.

Simmons, Matthew Earl

2007-05-01T23:59:59.000Z

91

S.M. Stoller Corporation and US Department of Energy PINELLAS ENVIRONMENTAL RESTORATION  

Office of Legacy Management (LM)

for: for: S.M. Stoller Corporation and US Department of Energy PINELLAS ENVIRONMENTAL RESTORATION PROJECT YOUNG - RAINEV STAR CENTER EVALUATION OF SUBSURFACE VAPOR INTRUSION BUILDING 100 LARGO, FLORIDA Prepared b y : 1 3 0 Research Lane, Suite 2 Guelph, Ontario N I G 5G3 GeoSyntec Project Number TR0 1 5 0 2 6 June 2 0 0 3 GeoSyntec Consultants TABLE OF CONTENTS Page 2. BACKGROUND .................................................................................................. 2 3. CONSIDERATION OF THE RECENT OSWER GUIDANCE DOCUMENT.. 4 4. APPROACH AND RATIONALE ....................................................................... 5 5 . ESTIMATED INDOOR AIR CONCENTRATIONS - ENTIRE BUILDING ... 6 6. ESTIMATED INDOOR AIR CONCENTRATIONS - BUILDING SUBSECTION ..................................................................................... .............. 8

92

Small Business Issues for Environmental Restoration Acquisitions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues for Environmental Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement contract, the Federal Government retains a portion of the payments made to the contractor so that, at the end of the contract, when the final audit is completed and actions are taken to close

93

Environmental restoration value engineering guidance document  

SciTech Connect

This document provides guidance on Value Engineering (VE). VE is an organized team effort led by a person trained in the methodology to analyze the functions of projects, systems, equipment, facilities, services, and processes for achieving the essential functions at the lowest life cycle cost while maintaining required performance, reliability, availability, quality, and safety. VE has proven to be a superior tool to improve up-front project planning, cut costs, and create a better value for each dollar spent. This document forms the basis for the Environmental Restoration VE Program, describes the VE process, and provides recommendations on when it can be most useful on ER projects.

NONE

1995-07-01T23:59:59.000Z

94

Gulf of Mexico Regional Ecosystem Restoration Strategy, Gulf Coast Ecosystem Restoration Task Force, December 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

c c Gulf of Mexico Regional Ecosystem Restoration Strategy Gulf Coast Ecosystem Restoration Task Force December 2011 G u l f C o a s t E c o s y s t e m R e s t o r a t i o n T a s k F o r c e Cover Photo Credits: Brown pelicans: U.S. Fish and Wildlife Service Volunteer planting marsh grass: U.S. Fish and Wildlife Service, Steve Hillebrand Turtle: Texas Parks and Wildlife Department Wetlands: U.S. Fish and Wildlife Service Boats: Mississippi Development Authority, Tourism Division Nothing in this document is intended to create private rights of action or other enforceable individual legal rights. ©2011 Google Earth Map of Gulf of Mexico Coast US Gulf of Mexico Regional Ecosystem Restoration Strategy Gulf Coast Ecosystem Restoration Task Force December 2011 G u l f C o a s t E c o s y s t e m R e

95

Environmental Restoration and Waste Management: Strategic plan  

Science Conference Proceedings (OSTI)

The Brookhaven National Laboratory (BNL) site is currently divided into five major areas, Operable Units (OUs), and several Areas of Concern (AOCs), which are the focus of investigation and clean-up. The primary environmental concern is groundwater contamination and a major emphasis of the restoration activities is focused on this medium. Each year, BNL generates 60 tons of hazardous waste and 7,000 to 8,000 cubic feet of radioactive waste that result from research activities. These wastes are collected at a central location, packaged and shipped off site for disposal. The operations for Hazardous and Radioactive Waste Management are conducted in compliance with EPA and DOE regulations. BNL has continued to actively pursue means by which these wastes may be minimized. Activities in both the remediation and waste management arenas are intimately connected with the future vision of BNL. The long-range goal for remediation in conjunction with vigorous monitoring of BNL`s activities is to restore the site and maintain strong environmental controls. The goals of the waste minimization program include activities to find environmentally safe alternatives to materials currently in use. By careful planning, BNL will minimize the amount of all waste, including sanitary, that is generated on site.

Not Available

1994-09-01T23:59:59.000Z

96

Environmental Restoration Remedial Action Program records management plan  

SciTech Connect

The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan ((FOMP) DOE-RL 1989) describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document ((QARD) DOE-RL 1991), provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig.

Michael, L.E.

1991-07-01T23:59:59.000Z

97

Post-project appraisal of Martin Canyon Creek restoration  

E-Print Network (OSTI)

Haltiner, Jeffery. 1997. Martin Canyon Stream Stabilization:Williams & Associates, Ltd. 1999. Martin Canyon Creek StreamPost-Project Appraisal of Martin Canyon Creek Restoration

Wagner, Wayne; Roseman, Jesse

2006-01-01T23:59:59.000Z

98

Secretary Bodman Signs Order to Help Restore Electricity to East...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

its electricity transmission and distribution infrastructure. "In the aftermath of any disaster, it's critically important that we work together to restore life-saving and...

99

Scientific assessment of coastal wetland loss, restoration and ...  

U.S. Energy Information Administration (EIA)

Get this from a library! Scientific assessment of coastal wetland loss, restoration and management in Louisiana. [Donald F Boesch; Louisiana State ...

100

PPT – Wetland Restoration in Coastal Louisiana PowerPoint ...  

U.S. Energy Information Administration (EIA)

Wetland Restoration in Coastal Louisiana – A free PowerPoint PPT presentation (displayed as a Flash slide show) on PowerShow.com

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE-STD-1157-2002; Environmental Restoration Functional Area...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

restoration personnel shall demonstrate a familiarity level knowledge of chemistry fundamentals. Supporting Knowledge andor Skills a. Discuss the following types of...

102

Restoration Prioritization Toolset: Documentation and User’s Guides 2007  

SciTech Connect

This user’s guide provides technical background and details on the Restoration Prioritization Toolset developed for GoMRC as well as instructions for use.

Judd, Chaeli; Woodruff, Dana L.; Thom, Ronald M.; Anderson, Michael G.; Borde, Amy B.

2007-10-26T23:59:59.000Z

103

Four-quark condensates and chiral symmetry restoration in a resonance gas model  

E-Print Network (OSTI)

As an alternative to the two-quark condensate we propose a specific four-quark condensate as an order parameter of chiral symmetry restoration. We show that this four-quark condensate is closer connected to observable quantities. Within a resonance gas model we calculate the in-medium changes of two- and four-quark condensate as functions of temperature and baryo-chemical potential. In this way we estimate the line of chiral symmetry restoration in the temperature-potential plane and also as a function of energy and baryon density. It turns out that the line determined from the vanishing of the four-quark condensate is extremely constant as a function of the energy density.

Stefan Leupold

2006-04-06T23:59:59.000Z

104

Temporal changes in C and N stocks of restored prairie: implications for C sequestration strategies  

Science Conference Proceedings (OSTI)

The recovery of ecosystem C and N dynamics after disturbance can be a slow process. Chronosequence approaches offer unique opportunities to use space-for-time substitution to quantify the recovery of ecosystem C and N stocks and estimate the potential of restoration practices for C sequestration. We studied the distribution of C and N stocks in two chronosequences that included long-term cultivated lands, 3- to 26-year-old prairie restorations, and remnant prairie on two related soil series. Results from the two chronosequences did not vary significantly and were combined. Based on modeling predictions, the recovery rates of different ecosystem components varied greatly. Overall, C stocks recovered faster than N stocks, but both C and N stocks recovered more rapidly for aboveground vegetation than for any other ecosystem component. Aboveground C and N reached 95% of remnant levels in only 13 years and 21 years, respectively, after planting to native vegetation. Belowground plant C and N recovered several decades later, while microbial biomass C, soil organic C (SOC), and total soil N recovered on a century timescale. In the cultivated fields, SOC concentrations were depleted within the surface 25 cm, coinciding with the depth of plowing, but cultivation apparently led to redistribution of soil C, increasing SOC stocks deeper in the soil profile. The restoration of prairie vegetation was effective at rebuilding soil organic matter (SOM) in the surface soil. Accrual rates were maintained at 43 g C {center_dot} m{sup -2} {center_dot} yr{sup -1} and 3 g N {center_dot} m{sup -2} {center_dot} yr{sup -1} in the surface 0.16 Mg/m{sup 2} soil mass during the first 26 years of restoration and were predicted to reach 50% of their storage potential (3500 g C/m{sup 2}) in the first 100 years. We conclude that restoration of tallgrass prairie vegetation can restore SOM lost through cultivation and has the potential to sequester relatively large amounts of SOC over a sustained period of time. Whether restored prairies can retain the C apparently transferred to the subsoil by cultivation practices remains to be seen.

Matamala, Roser [Argonne National Laboratory (ANL); Jastrow, Julie D [ORNL; Miller, Raymond M [Argonne National Laboratory (ANL); Garten Jr, Charles T [ORNL

2008-10-01T23:59:59.000Z

105

Temporal changes in C and N stocks of restored prairie : implications for C sequestration strategies.  

SciTech Connect

The recovery of ecosystem C and N dynamics after disturbance can be a slow process. Chronosequence approaches offer unique opportunities to use space-for-time substitution to quantify the recovery of ecosystem C and N stocks and estimate the potential of restoration practices for C sequestration. We studied the distribution of C and N stocks in two chronosequences that included long-term cultivated lands, 3- to 26-year-old prairie restorations, and remnant prairie on two related soil series. Results from the two chronosequences did not vary significantly and were combined. Based on modeling predictions, the recovery rates of different ecosystem components varied greatly. Overall, C stocks recovered faster than N stocks, but both C and N stocks recovered more rapidly for aboveground vegetation than for any other ecosystem component. Aboveground C and N reached 95% of remnant levels in only 13 years and 21 years, respectively, after planting to native vegetation. Belowground plant C and N recovered several decades later, while microbial biomass C, soil organic C (SOC), and total soil N recovered on a century timescale. In the cultivated fields, SOC concentrations were depleted within the surface 25 cm, coinciding with the depth of plowing, but cultivation apparently led to redistribution of soil C, increasing SOC stocks deeper in the soil profile. The restoration of prairie vegetation was effective at rebuilding soil organic matter (SOM) in the surface soil. Accrual rates were maintained at 43 g C {center_dot} m{sup -2} {center_dot} yr{sup -1} and 3 g N {center_dot} m{sup -2} {center_dot} yr{sup -1} in the surface 0.16 Mg/m{sup 2} soil mass during the first 26 years of restoration and were predicted to reach 50% of their storage potential (3500 g C/m{sup 2}) in the first 100 years. We conclude that restoration of tallgrass prairie vegetation can restore SOM lost through cultivation and has the potential to sequester relatively large amounts of SOC over a sustained period of time. Whether restored prairies can retain the C apparently transferred to the subsoil by cultivation practices remains to be seen.

Matamala, R.; Jastrow, J. D.; Miller, R. M.; Garten, C. T.; Biosciences Division; ORNL

2008-09-01T23:59:59.000Z

106

Do flowers affect biomass estimate accuracy from NDVI and EVI?  

Science Conference Proceedings (OSTI)

The Normalized Difference Vegetation Index (NDVI) and Enhanced Vegetation Index (EVI) are vegetation indices widely used in remote sensing of above-ground biomass. Because both indexes are based on spectral features of plant canopy, NDVI and EVI may ...

Miaogen Shen; Jin Chen; Xiaolin Zhu; Yanhong Tang; Xuehong Chen

2010-03-01T23:59:59.000Z

107

Wind River Watershed Restoration 2004-2005 Annual Report.  

DOE Green Energy (OSTI)

During 2004, researchers from U.S. Geological Survey's Columbia River Research Laboratory (USGS-CRRL) collected temperature, flow, and habitat data to characterize physical habitat condition and variation within and among tributaries and mainstem sections in the Wind River subbasin. Juvenile salmonid population surveys were conducted within select study areas throughout the subbasin. We expanded our survey coverage of the mainstem Wind River to a reach in the vicinity of Carson National Fish Hatchery to assess effects of non-indigenous Chinook on native steelhead. These efforts add to a database of habitat and fish data collected in the Wind River since 1996. This research contributes to the Wind River Restoration Project, which includes active stream habitat restoration and monitoring of adult and juvenile steelhead populations. We maintained a network of 32 thermographs in the Wind River subbasin during 2004. Additionally, Underwood Conservation District provided us with data from seven thermographs that they maintained during 2004. Thermograph data are identifying areas with chronic high water temperatures and stream sections where high rates of warming are occurring. During 2004, water temperatures at 26 thermograph sites exceeded the 16 C limit for surface waters set by the Washington Department of Ecology. Water temperatures exceeded 20 C at five sites in the Trout Creek watershed. Our thermograph dataset includes information from as early as 1996 at some sites and has become a valuable long-term dataset, which will be crucial in determining bioenergetic relationships with habitat and life-histories. We have monitored salmonid populations throughout the Wind River subbasin by electrofishing and snorkeling. We electrofished four stream sections for population estimates during 2004. In these sections, and others where we simply collected fish without a population estimate, we tagged juvenile steelhead and Chinook salmon with Passive Integrated Transponder (PIT) tags to track growth and movement of individuals. We snorkeled nine stream sections during 2004. Juvenile steelhead populations have varied greatly between streams and between years. Numbers of age-0 steelhead have increased substantially since 2000 within the MINE reach (rkm 35.0-40.0) section of the upper Wind River. Because of potential negative interactions with steelhead, naturally spawned populations of introduced juvenile Chinook salmon are of concern in the mainstem of the Wind River. During 2004, we deployed over 3,000 PIT tags in the Wind River subbasin, primarily in juvenile steelhead, but also in juvenile Chinook. We are compiling a dataset of recapture information on these tagged fish as well as interrogation information from Bonneville Dam and other sites. The habitat and fish data collected have been used in Ecosystem Diagnosis and Treatment modeling efforts, the Wind River Subbasin Plan, and the Total Maximum Daily Load report from Washington Department of Ecology. Continued monitoring of changes in habitat, combined with data on fish populations, will help guide planning efforts of land and fish managers. As long-term active and passive restoration actions are implemented in the Wind River and its tributaries, these data will provide the ability to measure change. Because the Wind River subbasin has no steelhead hatchery or supplementation, these data will be useful to compare population trends in subbasins with hatchery or supplementation management.

Connolly, Patrick J.; Jezorek, Ian G. [U.S. Geological Survey

2008-11-10T23:59:59.000Z

108

Brookhaven Graphite Research Reactor | Environmental Restoration Projects |  

NLE Websites -- All DOE Office Websites (Extended Search)

- Cleanup Actions - Cleanup Actions Since the Brookhaven Graphite Research Reactor (BGRR) was shut down in 1968, many actions have been taken as part of the complex decommissioning. The actions undertaken throughout the BGRR complex ensure that the structures that remain are in a safe and stable condition and prepared it for long-term surveillance and maintenance. Regulatory Requirements The decommissioning of the BGRR was conducted under the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In 1992, an Interagency Agreement (PDF) among the DOE, the U.S. Environmental Protection Agency (EPA) and the New York State Department of Environmental Conservation (NYSDEC) became effective. The IAG provided the overall framework for conducting environmental restoration activities at

109

Dictionary construction in sparse methods for image restoration  

Science Conference Proceedings (OSTI)

Sparsity-based methods have achieved very good performance in a wide variety of image restoration problems, including denoising, inpainting, super-resolution, and source separation. These methods are based on the assumption that the image to be reconstructed may be represented as a superposition of a few known components, and the appropriate linear combination of components is estimated by solving an optimization such as Basis Pursuit De-Noising (BPDN). Considering that the K-SVD constructs a dictionary which has been optimised for mean performance over a training set, it is not too surprising that better performance can be achieved by selecting a custom dictionary for each individual block to be reconstructed. The nearest neighbor dictionary construction can be understood geometrically as a method for estimating the local projection into the manifold of image blocks, whereas the K-SVD dictionary makes more sense within a source-coding framework (it is presented as a generalization of the k-means algorithm for constructing a VQ codebook), is therefore, it could be argued, less appropriate in principle, for reconstruction problems. One can, of course, motivate the use of the K-SVD in reconstruction application on practical grounds, avoiding the computational expense of constructing a different dictionary for each block to be denoised. Since the performance of the nearest neighbor dictionary decreases when the dictionary becomes sufficiently large, this method is also superior to the approach of utilizing the entire training set as a dictionary (and this can also be understood within the image block manifold model). In practical terms, the tradeoff is between the computational cost of a nearest neighbor search (which can be achieved very efficiently), or of increased cost at the sparse optimization.

Wohlberg, Brendt [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

110

Fast nonconvex nonsmooth minimization methods for image restoration and reconstruction  

Science Conference Proceedings (OSTI)

Nonconvex nonsmooth regularization has advantages over convex regularization for restoring images with neat edges. However, its practical interest used to be limited by the difficulty of the computational stage which requires a nonconvex nonsmooth minimization. ... Keywords: continuation methods, fast fourier transform, global minimization, image reconstruction, image restoration, nonconvex nonsmooth, nonconvex nonsmooth regularization, total variation.

Mila Nikolova; Michael K. Ng; Chi-Pan Tam

2010-12-01T23:59:59.000Z

111

Restoring images with a multiscale neural network based technique  

Science Conference Proceedings (OSTI)

This paper describes a neural network based multiscale image restoration approach in which multilayer perceptrons are trained with artificial images of degraded gray level cocentered circles. The main objective of this approach is to make the neural ... Keywords: artificial neural network, image restoration, multiscale

Ana Paula Abrantes de Castro; José Demisio Simőes da Silva

2008-03-01T23:59:59.000Z

112

Restoring afforested peat bogs: results of current research  

E-Print Network (OSTI)

and fen restoration trials caused the vegetation and CO2­carbon balance to change towards that of pristine and stores of carbon may be lost if they are planted with trees. The number of bogs being restored others in terms of raising the water table. Bog vegetation recovered rapidly in the felled treatments

113

Research of Dynamic Voltage Restorer Based on Repetitive Control Strategy  

Science Conference Proceedings (OSTI)

This paper introduces a dynamic voltage restorer with independent three-phase structure, which is controlled on repetitive control strategy. Computer simulation of the whole repetitive control system is performed by Matlab/Simulink, and the results show ... Keywords: Dynamic Voltage Restorer, Repetitive Control, Voltage Sag

Tianyu Liu

2012-10-01T23:59:59.000Z

114

Optimal Compensation Algorithms for a Dynamic Voltage Restorer  

Science Conference Proceedings (OSTI)

The Dynamic Voltage Restorer (DVR) as an electronics based custom device, is used to protect sensitive loads from the voltage sags in the power distribution system. With the rapid technology advancement in industrial control processes, it is experiencing ... Keywords: Dynamic Voltage Restorer (DVR), power quality, voltage sag, Zero Active Power Compensation (ZAPC), Minimal Active Power Compensation (MAPC)

Deng Pan; Chen Zhongming; Jiang Peng; Abdelkrim Benchaib; Guillaume De Preville

2010-06-01T23:59:59.000Z

115

Lake and reservoir restoration guidance manual: first edition  

SciTech Connect

This manual provides guidance to lake managers, homeowners, lake associations, and laypersons on lake and reservoir restoration, management and protection. It also provides information on how to identify lake problems, evaluate practices for restoring and protection lakes, watershed management, and creating a lake-management plan.

Moore, L.; Thornton, K.

1988-02-01T23:59:59.000Z

116

Restoration of audio documents by means of extended Kalman filter  

Science Conference Proceedings (OSTI)

We present some results on audio restoration obtained with an algorithm that solves the problems of broadband noise filtering, signal parameters tracking, and impulsive noise removal by using the Extended Kalman Filter (EKF) theory. We show that, to ... Keywords: Kalman filtering, audio restoration, audio signal processing, extended Kalman filter (EKF), identification of time-varying autoregressive processes

Sergio Canazza; Giovanni De Poli; Gian Antonio Mian

2010-08-01T23:59:59.000Z

117

New image restoration method associated with tetrolets shrinkage and weighted anisotropic total variation  

Science Conference Proceedings (OSTI)

Image restoration is one of the most classical problems in image processing. The main issues of image restoration are deblurring, denoising and preserving fine details. In order to obtain good restored images, we propose a new image restoration method ... Keywords: Image restoration, Tetrolet transform, Weighted anisotropic total variation

Liqian Wang; Liang Xiao; Jun Zhang; Zhihui Wei

2013-04-01T23:59:59.000Z

118

EA-1974: Wallooskee-Youngs Confluence Restoration Project, Clatsop County,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Wallooskee-Youngs Confluence Restoration Project, Clatsop 4: Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon EA-1974: Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon Summary Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed restoration of a tidal marsh in the Columbia River Estuary, near Astoria in Clatsop County, Oregon. The project website is https://www.bpa.gov/goto/WallooskeeYoungs. Public Comment Opportunities Comments on the scope of the EA should be marked "Wallooskee-Youngs Confluence Restoration Project" and submitted by January 27, 2014, by one of the methods listed below. Comments will be posted in their entirety on BPA's website at www.bpa.gov/comments. Toll-free phone: 800-622-4519

119

Pacific Lamprey Research and Restoration Project : Annual Report 2001.  

DOE Green Energy (OSTI)

Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

Close, David A.

2002-11-01T23:59:59.000Z

120

Healthy Forests Restoration Act of 2003 | Open Energy Information  

Open Energy Info (EERE)

Healthy Forests Restoration Act of 2003 Healthy Forests Restoration Act of 2003 Jump to: navigation, search Statute Name Healthy Forests Restoration Act of 2003 Year 2003 Url [[File:|160px|link=]] Description References Healthy Forests Restoration Act of 2003 PDF[1] This article is a stub. You can help OpenEI by expanding it. The Healthy Forests Initiative (or HFI), officially the Healthy Forests Restoration Act of 2003 (P.L. 108-148), is a law originally proposed by President George W. Bush in response to the widespread forest fires during the summer of 2002.[1] The main thrusts of the law are to thin overstocked stands, clear away vegetation and trees to create shaded fuel breaks, provide funding and guidance to reduce or eliminate hazardous fuels in National Forests, improve forest fire fighting, and research new methods to

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Clean Water Action Plan: Restoring and protecting America`s waters  

Science Conference Proceedings (OSTI)

On October 18, 1997, the 25th anniversary of the enactment of the Clean Water Act, the Vice President called for a renewed effort to restore and protect water quality. The Vice President asked that the Secretary of Agriculture and the Administrator of the Environmental Protection Agency (EPA), working with other affected agencies, develop a Clean Water Action Plan that builds on clean water successes and addresses three major goals: (1) enhanced protection from public health threats posed by water pollution; (2) more effective control of polluted runoff; and (3) promotion of water quality protection on a watershed basis.

NONE

1998-02-01T23:59:59.000Z

122

Hangman Restoration Project, Annual Report 2002-2003.  

DOE Green Energy (OSTI)

Progress has been made in defining the level of work that needs to be accomplished in the Hangman Watershed in order to restore a viable riparian system and hydrology. The end goal is to use wildlife habitat to protect streams and provide water for instream fish habitats. In order to define the most expedient means of attaining that goal an Instream Flow/Watershed Hydrology Study was initiated. The study is intended to be comprehensive in order to determine the potential of increasing base flow with Hangman Watershed Streams and predict available fish habitats for the range of flow level possibilities. The Study Plan and work for the first field season was contracted and the Plan and end of field season reports are included with this Annual Report. The initial draft of the wildlife portion of the Monitoring and Evaluation Plan was completed and presented to the Columbia Basin Fish and Wildlife Authority Wildlife Committee. The Committee felt that the Basin Hydrology Study needed to be closer to completion before the bulk of wildlife monitoring should be implemented. The extent of the landscape that must be restored in order to facilitate the needed stream flows may not be large enough to affect the population levels of the Plan's target species. The main result of the Committee review of the Monitoring and Evaluation Plan however, was that since the Hangman Restoration Project is not a HU driven wildlife mitigation project than the Wildlife Committee does not have a role to play since their focus is wildlife HU crediting projects. Further work on the wildlife portion of the Monitoring and Evaluation Plan is suspended until the crediting issues surrounding the Hangman Restoration Project are settled. Certain aspects of the Plan, such as the land bird, amphibian, reptile and beaver monitoring can be implemented in the spring of the coming year because monitoring these species and groups needs to be accomplished regardless of crediting status and baseline data is needed for these. Data from the Hangman Creek Watershed from portions upstream and east of the Coeur d'Alene Indian Reservation were included in the Second Iteration of the Habitat Prioritization Plan. These data were gathered both by the Coeur d'Alene Tribe and Idaho's Department of Environmental Quality. The addition of this portion of the Watershed in the Prioritization Plan fills a gap that the lack of data left in the first draft of the Plan. The streams in these upper headwaters support remnant salmonid populations and are close enough to be integrated with the streams and trout populations on the Reservation. The addition of this area strengthens the base from which the Hangman Restoration Project can work to secure and expand resident fish populations. An extensive 2-year search for historic photos of the upper portion of the Hangman Watershed was completed during this annual funding cycle. The disappointing result is that few photographs were acquired. One excellent panoramic view of the Upper Hangman Watershed from Tekoa Mountain was recovered and photos of this view were taken for comparison. The task of finding historic photos has been removed from future Scopes of Work, however search for photos will continue as part of the Project's public outreach. The notable exception to the lack of historic photos is the purchase, digitizing and GIS registry of 1947 aerial photo coverage of the entire Hangman Creek Watershed east of the Washington/Idaho State Boarder. In addition, 1933 aerial photo coverage of most of this same area is being registered to our GIS system. These 1933 photos were available to the Tribe prior to the initiation of this Project; however these photos are being registered partly as a result of requests made from this Project. The process of developing a map of potential vegetation types for the Hangman Watershed has benefited from establishment of an Interagency Agreement with the U.S. Geologic Survey to hire a Scientific Advisor. The Scientific Advisor has assisted with the design of a scheme to sample remnant native vegetation within an

Coeur d'Alene Tribe

2003-10-01T23:59:59.000Z

123

Independent Component Analysis for Document Restoration  

E-Print Network (OSTI)

We propose a novel approach to restoring digital document images, with the aim of improving text legibility and OCR performance. These are often compromised by the presence of artifacts in the background, derived from many kinds of degradations, such as spots, underwritings, and show-through or bleed-through e#ects. So far, background removal techniques have been based on local, adaptive filters and morphological--structural operators to cope with frequent low-contrast situations. For the specific problem of bleed-through/show-through, most work has been based on the comparison between the front and back pages. This, however, requires a preliminary registration of the two images. Our approach is based on viewing the problem as one of separating overlapped texts and then reformulating it as a blind source separation problem, approached through independent component analysis techniques. These methods have the advantage that no models are required for the background. In addition, we use the spectral components of the image at di#erent bands, so that there is no need for registration. Examples of bleed-through cancellation and recovery of underwriting from palimpsests are provided.

Anna Tonazzini; Luigi Bedini; Emanuele Salerno

2004-01-01T23:59:59.000Z

124

Impacts to Dungeness Crab from the Southwest Washington Littoral Drift Restoration Project  

SciTech Connect

The Benson Beach littoral drift restoration project is a demonstration project that will replenish sand on Benson Beach, the public beach north of the North Jetty at the mouth of the Columbia River (MCR), using material dredged from the river during normal maintenance dredging of the navigational channel. A U.S. Army Corps of Engineers (Corps) proposal involves pumping the material from a sump area on the south side of the jetty to Benson Beach using a cutter suction dredge, also known as a pipeline dredge. If this one-time demonstration project proves feasible and successful, up to a million cubic yards of sediment could be used to replenish the outer coast littoral drift system in successive years by the same process. The primary goal of this study was to assess the potential risk of impacts to Dungeness crab from the proposed Benson Beach littoral drift restoration process of using the cutter suction dredge to move sediment from the proposed sump area on one side of the North Jetty to the beach on the other side of the jetty. Because there are no direct measurements of crab entrainment by pipeline dredge operating outside of the lower Columbia River navigation channel, dredge impacts for the proposed demonstration project were estimated using a modification of the dredge impact model (DIM) of Armstrong et al. (1987). The model estimates adult equivalent loss (AEL) of crabs using crab population density from trawl surveys, dredge project information (gear type, season, location, volume), and an entrainment function relating crab population density to entrainment by the dredge. The input used in applying the DIM to the Benson Beach littoral drift restoration included the specific dredging scenario provided by the Corps, existing data on crab density in previously proposed sump areas, and a series of entrainment functions. A total of fourteen scenarios were modeled and the outcomes compared with six reference scenarios intended to represent realistic to worst cases. Dungeness crab entrainment and subsequent loss of recruitment to adult age classes and the crab fishery estimated for the Benson Beach littoral drift restoration project varied widely (over three orders of magnitude) because of the range of assumptions about initial crab density, dredging scenarios, and entrainment functions. Although the comparison to reference scenarios helps put the results in perspective, losses to the crab fishery could still span two orders of magnitude. This uncertainty can only be assessed by direct measurements of crab entrainment during the demonstration project if crab losses are to be more accurately estimated for the demonstration, which is recommended in order to evaluate cumulative crab losses from successive replenishment efforts.

Williams, Greg D.; Kohn, Nancy P.; Pearson, Walter H.; Skalski, J R.

2005-11-09T23:59:59.000Z

125

Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT  

SciTech Connect

The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

2012-05-31T23:59:59.000Z

126

Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan The natural resources of the Gulf's ecosystem are vital to many of the region's industries that directly support economic progress and job creation, including tourism and recreation, seafood production and sales, energy production and navigation and commerce. Among the key priorities of the strategy are: 1) Stopping the Loss of Critical Wetlands, Sand Barriers and Beaches The strategy recommends placing ecosystem restoration on an equal footing with historic uses such as navigation and flood damage reduction by approaching water resource management decisions in a far more comprehensive manner that will bypass harm to wetlands, barrier islands and beaches. The

127

EA-0941: Lower Yakima Valley Wetlands and Riparian Restoration Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41: Lower Yakima Valley Wetlands and Riparian Restoration 41: Lower Yakima Valley Wetlands and Riparian Restoration Project, Washington EA-0941: Lower Yakima Valley Wetlands and Riparian Restoration Project, Washington SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy's Bonneville Power Administration to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs. The proposed action would allow the sponsors to ensure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. PUBLIC COMMENT OPPORTUNITIES None available at this time.

128

Response to Hurricane Irene - Restoring Power on the East Coast |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response to Hurricane Irene - Restoring Power on the East Coast Response to Hurricane Irene - Restoring Power on the East Coast Response to Hurricane Irene - Restoring Power on the East Coast September 2, 2011 - 3:15pm Addthis Response to Hurricane Irene – Restoring Power on the East Coast Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability Hurricane Irene struck the East coast last Friday, making landfall in North Carolina. Over the weekend, the storm traveled up the East Coast and into the mid-Atlantic and New England areas of the U.S. In response to Irene, Connecticut, Delaware, District of Columbia, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, North Carolina, Pennsylvania, Rhode Island, Vermont, and Virginia declared a State of

129

DOE Awards Contract to Restoration Services, Inc. for Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at Portsmouth Site June 25, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Restoration Services, Inc. (RSI), has been awarded a...

130

Habitat Restoration at the Salmon, Mississippi, Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Property Reuse » Habitat Restoration at Property Reuse » Habitat Restoration at the Salmon, Mississippi, Site Habitat Restoration at the Salmon, Mississippi, Site Habitat Restoration at the Salmon, Mississippi, Site The 1,470-acre Salmon, Mississippi, Site is located in Lamar County, approximately 20 miles southwest of Hattiesburg, in southwestern Mississippi. It is roughly square in shape, and each side is approximately 1.52 miles long. The site was used by the U.S. Atomic Energy Commission and the U.S. Department of Defense for underground nuclear testing in the 1960s. The site was decontaminated, remediated, and decommissioned in 1972, and all buildings and equipment were removed at that time. Two small, shallow pockets of contamination were left for remediation by natural attenuation. A subsequent remedial investigation was completed in 1999. Final site

131

Energy Department and Federal Efforts to Support Utility Power Restoration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Efforts to Support Utility Power Federal Efforts to Support Utility Power Restoration Efforts Energy Department and Federal Efforts to Support Utility Power Restoration Efforts October 31, 2012 - 5:19pm Addthis 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of the Energy Department 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of the Energy Department Jen Stutsman Press Secretary, Office of Public Affairs What does this mean for me? Restoring power is a top priority for the Obama Administration and the Department of Energy. As of 2 PM EDT today, utilities have restored power to nearly 2.4 million customers. This is a 28 percent decrease from the peak following the storm.

132

Energy Department and Federal Efforts to Support Utility Power Restoration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department and Federal Efforts to Support Utility Power Energy Department and Federal Efforts to Support Utility Power Restoration Efforts Energy Department and Federal Efforts to Support Utility Power Restoration Efforts October 31, 2012 - 5:19pm Addthis 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of the Energy Department 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of the Energy Department Jen Stutsman Press Secretary, Office of Public Affairs What does this mean for me? Restoring power is a top priority for the Obama Administration and the Department of Energy. As of 2 PM EDT today, utilities have restored power to nearly 2.4 million customers.

133

DOE Awards Contract to Restoration Services, Inc. for Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract to Restoration Services, Inc. for Environmental Contract to Restoration Services, Inc. for Environmental Technical Services at Portsmouth Site DOE Awards Contract to Restoration Services, Inc. for Environmental Technical Services at Portsmouth Site June 25, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Restoration Services, Inc. (RSI), has been awarded a task order for environmental technical services supporting the remediation and decontamination and decommissioning (D&D)of the Portsmouth Gaseous Diffusion Plant (GDP) at DOE's Portsmouth Site in Pinkerton, Ohio. The time and materials task order under the Environmental Services GSA Federal Supply Schedule is valued at approximately $67 million over five years (a three-year base period with the option to extend it for another two years).

134

Restoring Equilibrium to Natural Gas Markets: Can Renewable Energy Help?  

E-Print Network (OSTI)

AC03- 76SF00098. The report “Easing the Natural Gas Crisis:Reducing Natural Gas Prices through Increased Deployment ofRestoring Equilibrium to Natural Gas Markets: Can Renewable

Wiser, Ryan; Bolinger, Mark

2005-01-01T23:59:59.000Z

135

Protect and Restore Mill Creek Watershed : Annual Report CY 2005.  

DOE Green Energy (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. The Nez Perce Tribe and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership, more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Mill Creek watershed of the South Fork Clearwater River in 2000. Progress has been made in restoring the watershed through excluding cattle from critical riparian areas through fencing. Starting in FY 2002, continuing into 2004, trees were planted in riparian areas in the meadow of the upper watershed. In addition, a complete inventory of culverts at road-stream crossings was completed. Culverts have been prioritized for replacement to accommodate fish passage throughout the watershed, and one high priority culvert was replaced in 2004. Maintenance to the previously built fence was also completed.

McRoberts, Heidi

2006-03-01T23:59:59.000Z

136

Many Factors Affect MPG  

NLE Websites -- All DOE Office Websites (Extended Search)

Many Factors Affect Fuel Economy Many Factors Affect Fuel Economy How You Drive Vehicle Maintenance Fuel Variations Vehicle Variations Engine Break-In Vehicles in traffic Quick acceleration and heavy braking can reduce fuel economy by up to 33 percent on the highway and 5 percent around town. New EPA tests account for faster acceleration rates, but vigorous driving can still lower MPG. Excessive idling decreases MPG. The EPA city test includes idling, but more idling will lower MPG. Driving at higher speeds increases aerodynamic drag (wind resistance), reducing fuel economy. The new EPA tests account for aerodynamic drag up to highway speeds of 80 mph, but some drivers exceed this speed. Cold weather and frequent short trips can reduce fuel economy, since your engine doesn't operate efficiently until it is warmed up. In colder

137

Richland Environmental Restoration Project management action process document  

SciTech Connect

This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

NONE

1996-04-01T23:59:59.000Z

138

Directing ecological restoration: impact of organic amendments on above- and belowground ecosystem characteristics  

E-Print Network (OSTI)

Increasing interest among restoration ecologists exists in developing strategies that stimulate biotic interactions and promote self-regulation in restored systems. These approaches should target above- and belowground organisms because they interact to regulate ecosystem pattern and process. In the following dissertation, I compare the ability of organic amendments to alter above- and belowground biological community structure and function to promote prairie establishment on Castle Drive Landfill in Garland, Dallas County, Texas. Treatments included altering the location of organic amendments in the soil profile, either applied to surface or incorporated, and varying the amount applied. Plant community composition, grass population dynamics, soil nutrient conditions, and soil biological parameters were monitored for three growing seasons. Aboveground, the surface treatments were superior for the establishment of desired and undesired plant species. Plant density patterns can be attributed to the amelioration of physical conditions and the accidental burial of seed during incorporation. Grass population dynamics suggest that surface-amended plots supported establishment, but high-volume incorporated treatments were better for enhancing survival through seasonal and long-term drought. Belowground biological responses were affected by the plant community, and not by the amendment treatments. Soil microbial biomass and carbon mineralization potential were larger in those treatments with greater plant density. The structure of the nematode community suggests that decomposition in the surface-amended plots was directed through bacterial channels while decomposition in the incorporated plots was through fungal channels. It is likely that the higher rates of plant productivity in surface treatments stimulated root exudation, thereby favoring bacteria and the nematodes that feed on them. Treatment differences in decomposition pathway were attenuated after 17 months. The soil quality indicators, Cmic/Corg, qCO2, nematode family richness and nematode density, were not affected by the restoration treatments or plant density, but did increase over time. The results of this study suggest that restoration managers should direct their energies into establishing and promoting a high-quality plant community. This can be manipulated with amendments, but care is needed not to exceed thresholds within location treatments.

Biederman, Lori Ann

2007-05-01T23:59:59.000Z

139

Crude Oil Affects Gasoline Prices  

U.S. Energy Information Administration (EIA)

Crude Oil Affects Gasoline Prices. WTI Crude Oil Price. Retail Gasoline Price. Source: Energy Information Administration

140

Pacific Lamprey Research and Restoration Project, Annual Report 2002.  

DOE Green Energy (OSTI)

Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

Close, David; Aronsuu, Kimmo; Jackson, Aaron

2003-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Secretary Chu: President's Energy Budget Creates Jobs, Restores America's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu: President's Energy Budget Creates Jobs, Restores Chu: President's Energy Budget Creates Jobs, Restores America's Scientific Leadership and Puts Nation on the Path to Energy Independence Secretary Chu: President's Energy Budget Creates Jobs, Restores America's Scientific Leadership and Puts Nation on the Path to Energy Independence May 7, 2009 - 12:00am Addthis Washington D.C. --- U.S. Energy Secretary Steven Chu today detailed President Barack Obama's $26.4 billion Fiscal Year 2010 budget request for the Department of Energy, highlighting the Administration's commitment to transformational discoveries, breakthrough science, and innovative technologies in the nation's effort to secure reliable, clean, safe and secure energy, create new jobs and fight climate change. While the budget makes important investments in energy independence and job creation, it

142

Chesapeake Bay Restoration Act (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Act (Maryland) Restoration Act (Maryland) Chesapeake Bay Restoration Act (Maryland) < Back Eligibility Agricultural Commercial Construction Developer Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Environmental Regulations Provider Maryland Department of the Environment This legislation sets limits on development near Chesapeake Bay as well as on dredging and the deposition of dredged material into the bay. The legislation establishes the Cox Creek Citizens Oversight Committee (now mostly defunct); the Hart-Miller-Pleasure Island Oversight Committee, which provides oversight and monitoring of the future development, use, and

143

Hangman Restoration Project Year-End Report FY2008.  

DOE Green Energy (OSTI)

This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

Coeur d'Alene Tribe Department of Natural Resources.

2008-11-12T23:59:59.000Z

144

Protect and Restore Lolo Creek Watershed : Annual Report CY 2005.  

DOE Green Energy (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. Watershed restoration projects within the Lolo Creek watershed are coordinated with the Clearwater National Forest and Potlatch Corporation. The Nez Perce Tribe began watershed restoration projects within the Lolo Creek watershed of the Clearwater River in 1996. Fencing to exclude cattle for stream banks, stream bank stabilization, decommissioning roads, and upgrading culverts are the primary focuses of this effort. The successful completion of the replacement and removal of several passage blocking culverts represent a major improvement to the watershed. These projects, coupled with other recently completed projects and those anticipated in the future, are a significant step in improving habitat conditions in Lolo Creek.

McRoberts, Heidi

2006-03-01T23:59:59.000Z

145

Cardiac SPECT restoration using MR-based support constraints  

Science Conference Proceedings (OSTI)

Cardiac SPECT (single photon emission computed tomography) is an important tool for evaluating heart disease in terms of diagnosis and treatment, especially for determining myocardial perfusion and thus the degree of myocardial injury. The distortion ... Keywords: MR-based support constraints, biomedical NMR, cardiac SPECT restoration, cardiac perfusion images, cardiology, defect size determination errors, heart, heart disease evaluation, image restoration, left ventricular geometry distortion, medical diagnostic imaging, medical image processing, myocardial injury degree, myocardial perfusion determination, partial volume effects, registered magnetic resonance image, single photon emission computed tomography, treatment

L. H. Staib; A. Sinusas

1995-10-01T23:59:59.000Z

146

Environment, Environmental Restoration, and Waste Management Field Organization Directory  

SciTech Connect

This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers.

Not Available

1993-07-01T23:59:59.000Z

147

World trends: Improving fortunes restore upstream health  

SciTech Connect

After a decade of recovery from the oil price collapse of 1986, the global upstream industry appears headed for a period of renewed strength and growth. Underpinning the prosperity is steady unrelenting growth in crude demand. Stronger global crude demand and heavy natural gas usage in the US are driving higher prices. Operators are reacting to better prices with larger drilling programs. Also boosting drilling levels are crude production expansion projects that many countries have underway in response to perceived future demand. Not surprisingly, World Oil`s outlook calls for global drilling to rise 4.5% to 60,273 wells, a second straight annual increase. Better US activity is helping, but so are stronger-than-expected numbers in Canada. Meanwhile, World Oil`s 51st annual survey of governments and operators indicates that global oil production rose 1.4% last year, to 62,774 million bpd. That was not enough, however, to keep up with demand. The paper discusses financial performance, business practices, other factors, and operating outlook. A table lists the 1996 forecasts, estimated wells drilled in 1995, and total wells and footage drilled in 1994 by country. A second table lists global crude and condensate production and wells actually producing in 1995 versus 1994.

NONE

1996-08-01T23:59:59.000Z

148

Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2  

SciTech Connect

This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

Cote, R.F.

1993-11-01T23:59:59.000Z

149

WRITTEN STATEMENT OF DEPUTY CHIEF, ASSESSMENT AND RESTORATION DIVISION  

E-Print Network (OSTI)

damages resulting from the Deepwater Horizon BP oil spill. My name is Tony Penn and I am the Deputy Chief the opportunity to discuss the critical roles NOAA serves during and following oil spills and the importance, assessing, and restoring the public's coastal natural resources when they are impacted by oil spills

150

Strategic plan for Hanford Site Environmental Restoration Information Management  

SciTech Connect

This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

Cowley, P.J.; Beck, J.E.; Gephart, R.E. [and others

1994-06-01T23:59:59.000Z

151

SolarPower Restoration Systems Inc | Open Energy Information  

Open Energy Info (EERE)

SolarPower Restoration Systems Inc SolarPower Restoration Systems Inc Jump to: navigation, search Name SolarPower Restoration Systems Inc Place Seminole, Florida Zip 33772 Sector Solar Product SolarPower Restoration Systems is pursuing Building Integrated Photovoltaics (BIPV) systems and large scale Photovoltaic Power (PV) Array Systems over concrete and other construction surfaces. Coordinates 32.726625°, -102.645054° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.726625,"lon":-102.645054,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

152

Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERDF ERDF ETR Report Date: June 2007 ETR-6 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Operational Issues at the Environmental Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup activities. It contains double-lined cells with a RCRA Subtitle C- type liner and leachate collection system. By 2007, 6.8 million tons of waste with 39,000 Curies of radioactivity had been placed in the ERDF. In 2006, events occurred that affected the operation of the automatic leachate transfer pumps and a technician confessed to having not performed compaction tests and to falsification of the data.

153

Guidelines, processes and tools for coastal ecosystem restoration, with examples from the United States  

SciTech Connect

This paper presents a systematic approach to coastal restoration projects in five phases: planning, implementation, performance assessment, adaptive management, and dissemination of results. Twenty features of the iterative planning process are synthesized. The planning process starts with a vision, a description of the ecosystem and landscape, and goals. A conceptual model and planning objectives are developed, a site is selected using prioritization techniques, and numerical models contribute to preliminary designs as needed. Performance criteria and reference sites are selected and the monitoring program is designed. The monitoring program is emphasized as a tool to assess project performance and identify problems affecting progression toward project goals, in an adaptive management framework. Key approaches to aspects of the monitoring program are reviewed and detailed with project examples. Within the planning process, cost analysis involves budgeting, scheduling, and financing. Finally, documentation is peer reviewed prior to making construction plans and final costing.

Thom, Ronald M.; Diefenderfer, Heida L.; Adkins, Jeffery E.; Judd, Chaeli; Anderson, Michael G.; Buenau, Kate E.; Borde, Amy B.; Johnson, Gary E.

2011-02-01T23:59:59.000Z

154

Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

Dennis, C.B.

1993-08-01T23:59:59.000Z

155

Preliminary assessment report for Waiawa Gulch, Installation 15080, Pearl City, Oahu, Hawaii. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Hawaii Army National Guard (HIARNG) property near Pearl City, Oahu, Hawaii. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Waiawa Gulch property, phase I of the Department of Defense Installation Restoration Program (IRP).

Not Available

1993-08-01T23:59:59.000Z

156

Radiation dose estimates for radiopharmaceuticals  

SciTech Connect

Tables of radiation dose estimates based on the Cristy-Eckerman adult male phantom are provided for a number of radiopharmaceuticals commonly used in nuclear medicine. Radiation dose estimates are listed for all major source organs, and several other organs of interest. The dose estimates were calculated using the MIRD Technique as implemented in the MIRDOSE3 computer code, developed by the Oak Ridge Institute for Science and Education, Radiation Internal Dose Information Center. In this code, residence times for source organs are used with decay data from the MIRD Radionuclide Data and Decay Schemes to produce estimates of radiation dose to organs of standardized phantoms representing individuals of different ages. The adult male phantom of the Cristy-Eckerman phantom series is different from the MIRD 5, or Reference Man phantom in several aspects, the most important of which is the difference in the masses and absorbed fractions for the active (red) marrow. The absorbed fractions for flow energy photons striking the marrow are also different. Other minor differences exist, but are not likely to significantly affect dose estimates calculated with the two phantoms. Assumptions which support each of the dose estimates appears at the bottom of the table of estimates for a given radiopharmaceutical. In most cases, the model kinetics or organ residence times are explicitly given. The results presented here can easily be extended to include other radiopharmaceuticals or phantoms.

Stabin, M.G.; Stubbs, J.B.; Toohey, R.E. [Oak Ridge Inst. of Science and Education, TN (United States). Radiation Internal Dose Information Center

1996-04-01T23:59:59.000Z

157

Affective incoherence: When affective concepts and embodied reactions clash  

E-Print Network (OSTI)

Affective Incoherence: When Affective Concepts and Embodied Reactions Clash David B. Centerbar University of Massachusetts Medical School Simone Schnall University of Plymouth Gerald L. Clore University of Virginia Erika D. Garvin University... . Such internally generated feelings may be compelling because they are experienced in a manner similar to the sensory feelings elicited by external stimuli. Unlike conceptual knowledge, which is indirect and subject to verification (Kruglanski, 1989), affective...

Centerbar, David; Schnall, Simone; Clore, Gerald L.; Garvin, Erica

2008-01-01T23:59:59.000Z

158

Moses Lake Fishery Restoration Project; Factors Affecting the Recreational Fishery in Moses Lake Washington, Annual Report 2002-2003.  

DOE Green Energy (OSTI)

This annual report is a precursor to the final technical report we will be writing the next contract period. Consequently, this report, covering the period between September 27, 2002, and September 26, 2003, represents a progress report towards the final technical report we anticipate completing by September 26, 2004. Sample analysis and field work have progressed well and we anticipate no further delays. There are 4 objectives: (1) To quantify secondary production Moses Lake; (2) To quantify the influence of predation on target fishes in Moses Lake; (3) To quantify mortality of selected fished in Moses Lake; and (4) To assess effects of habitat changes from shoreline development and carp on the fish community in Moses Lake.

Burgess, Dave

2003-11-01T23:59:59.000Z

159

A Review of Power Outages and Restoration Following the June 2012 Derecho  

Energy.gov (U.S. Department of Energy (DOE))

This report reviews power outages and restoration efforts following the June 29, 2012 Derecho and compares them to outages and restoration efforts following other spring and summer storms in the...

160

Impacts of restoration of an uncontrolled phosphogypsum dumpsite on the seasonal distribution of abiotic variables,  

E-Print Network (OSTI)

Impacts of restoration of an uncontrolled phosphogypsum dumpsite on the seasonal distribution . Phosphogypsum restoration Introduction Coastal solar salterns are artificial and transitional eco- systems Mediterranean coast and which suffered from pollution by phosphogypsum (Rekik et al. 2012) Environ Monit Assess

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Optical flow guided TV-L1 video interpolation and restoration  

Science Conference Proceedings (OSTI)

The ability to generate intermediate frames between two given images in a video sequence is an essential task for video restoration and video post-processing. In addition, restoration requires robust denoising algorithms, must handle corrupted frames ...

Manuel Werlberger; Thomas Pock; Markus Unger; Horst Bischof

2011-07-01T23:59:59.000Z

162

Microsoft Word - WM Paper - Eco-Restoration Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Use of Ecological Restoration Principles To Achieve Remedy Protection At the Fernald Preserve and Weldon Spring Sites - 8354 J. Powell, F. Johnston, J. Homer Fernald Preserve 10995 Hamilton-Cleves Hwy. Harrison, Ohio 45030 Y. Deyo Weldon Spring 7295 Highway 94 South St. Charles, Missouri 63304 ABSTRACT At both the U.S. Department of Energy (DOE) Fernald Preserve and the Weldon Spring Site, the development of ecological restoration goals and objectives was used to complement and even enhance achievement of selected remedies. Warm-season native grasses and forbs were used for revegetation of remediated areas. The hardiness and ability to establish in low-nutrient conditions make native grasses ideal candidates for reestablishment of vegetation in excavated areas. At the Fernald Preserve, native grasses

163

Operational Issues at the Environmental Restoration Disposal Facility at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Operations Hanford Operations Evaluating Operational Issues at the Environmental Restoration Disposal Facility at Hanford By Craig H. Benson, PhD, PE; William H. Albright, PhD; and David P. Ray, PE Sponsored by: The Office of Engineering and Technology (EM-20) 17 June 2007 i TABLE OF CONTENTS EXECUTIVE SUMMARY ii ACKNOWLEDGEMENTS iv INTRODUCTION 1 BACKGROUND 1 Environmental Restoration Disposal Facility 1 Source of Concern 2 LINES OF INQUIRY 2 1. Validate Scope of Identified Problems 2 2. Assess Contractor Evaluation of the Elevated Leachate Level on the Landfill Liner 3 3. Evaluate Adequacy of Landfill Performance in View of the Discovered Falsified Compaction Data and Potential Leachate Level Problems 4

164

Forest Conservation and Restoration as a Response to Climate Change  

NLE Websites -- All DOE Office Websites (Extended Search)

Conservation and Conservation and Restoration as a Response to Climate change National Energy Technology Laboratory May 14, 2001 Forest Conservation and Restoration as a Response to Climate change National Energy Technology Laboratory May 14, 2001 Today's presentation * Nature Conservancy background * Land Use and Climate Change * Project Experience * Key Issues and Research Needs The mission of The Nature Conservancy is to preserve plants, animals and natural communities that represent the diversity of life on Earth by protecting the lands and waters they need to survive. Conservancy Background * Largest private conservation organization * Founded in 1951 * Conserved more than 12 million acres in U.S., and millions more in Latin America, the Caribbean, and Asia/Pacific * 1.2 million members

165

Environmental Restoration Strategic Plan. Remediating the nuclear weapons complex  

SciTech Connect

With the end of the cold war, the US has a reduced need for nuclear weapons production. In response, the Department of Energy has redirected resources from weapons production to weapons dismantlement and environmental remediation. To this end, in November 1989, the US Department of Energy (DOE) established the Office of Environmental Restoration and Waste Management (renamed the Office of Environmental Management in 1994). It was created to bring under a central authority the management of radioactive and hazardous wastes at DOE sites and inactive or shut down facilities. The Environmental Restoration Program, a major component of DOE`s Environmental Management Program, is responsible for the remediation and management of contaminated environmental media (e.g., soil, groundwater, sediments) and the decommissioning of facilities and structures at 130 sites in over 30 states and territories.

1995-08-01T23:59:59.000Z

166

Environment/Health/Safety (EHS): Environmental Restoration Program (ERP)  

NLE Websites -- All DOE Office Websites (Extended Search)

ERP ERP ESG Home ERP Home Documents Photo Gallery Contact Us Links Environmental Restoration Program Welcome to the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) website dedicated to its Environmental Restoration Program (ERP). The ERP is part of a nationwide effort by the United States Department of Energy (DOE) to identify and clean up contaminated areas at its facilities. The mission of the ERP is to protect human health and the environment by investigating and cleaning up soil and groundwater contaminated by past activities at Berkeley Lab. Berkeley Lab operates its Hazardous Waste Handling Facility under a Resource Conservation and Recovery Act (RCRA) Permit issued by the California Environmental Protection Agency Department of Toxic Substances

167

FAQS Job Task Analyses - Environmental Restoration Functional Area Qualification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Functional Area Qualification Restoration Functional Area Qualification Job Task Analysis CONDUCTING THE JOB / TASK ANALYSIS Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even if they don't exactly agree with it). - When all values have been assigned, consider as a group deleting tasks

168

Richland Environmental Restoration Project management action process document  

Science Conference Proceedings (OSTI)

A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

NONE

1996-04-01T23:59:59.000Z

169

Optimal Blackstart Capability (OBC) for Power System Restoration  

Science Conference Proceedings (OSTI)

The North American Electric Reliability Corporation (NERC) adopted a revised Emergency Operations and Preparedness (EOP) reliability standard EOP-005-2 titled, "System Restoration from Blackstart Resources" [1]. The Order issued by the Federal Energy Regulatory Commission (FERC) approving EOP-005-2 became effective on May 23, 2011, with an enforcement date of July 1, 2013 [2]. The purpose of this standard is to "Ensure plans, facilities, and personnel are prepared to enable System ...

2012-12-31T23:59:59.000Z

170

Development of the Platform-Mounted Dynamic Voltage Restorer (PMDVR)  

Science Conference Proceedings (OSTI)

The uninterrupted supply of electrical power is critical for many commercial utility customers with sensitive loads. A voltage sag of a few cycles could cause loss of many thousands of dollars due to lost production from process stoppage and associated clean-up issues. The Platform Mounted Dynamic Voltage Restorer (PMDVR) is a distribution voltage level device that compensates for changes in supply line voltage to maintain acceptable input power to customers.

1998-12-31T23:59:59.000Z

171

Secretary Chu: Presidentďż˝s Energy Budget Creates Jobs, Restores  

NLE Websites -- All DOE Office Websites (Extended Search)

Secretary Chu: President�s Energy Budget Creates Jobs, Restores America�s Scientific Leadership and Puts Nation on the Path to Energy Independence Secretary Chu: President�s Energy Budget Creates Jobs, Restores America�s Scientific Leadership and Puts Nation on the Path to Energy Independence Washington D.C. --- U.S. Energy Secretary Steven Chu today detailed President Barack Obama�s $26.4 billion Fiscal Year 2010 budget request for the Department of Energy, highlighting the Administration�s commitment to transformational discoveries, breakthrough science, and innovative technologies in the nation�s effort to secure reliable, clean, safe and secure energy, create new jobs and fight climate change. While the budget makes important investments in energy independence and job creation, it also cuts back on programs that don�t work as well or are no longer needed. �The President�s budget for energy reflects his commitment to ending our dependence on foreign oil, restoring our scientific leadership and putting Americans back to work through investments in a new green energy economy,� Secretary Chu said. �It also demonstrates his commitment to using taxpayer dollars wisely � cutting spending on programs we don�t need so we can make strategic investments in our economic future.�

172

Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories  

SciTech Connect

Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies] [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)] [Tech Reps, Inc., Albuquerque, NM (United States)

1996-08-01T23:59:59.000Z

173

Vehicle routing for the last mile of power system restoration  

SciTech Connect

This paper studied a novel problem in power system restoration: the Power Restoration Vehicle Routing Problem (PRVRP). The goal of PRVRPs is to decide how coordinate repair crews effectively in order to recover from blackouts as fast as possible after a disaster has occurred. PRVRPs are complex problems that combine vehicle routing and power restoration scheduling problems. The paper proposed a multi-stage optimization algorithm based on the idea of constraint injection that meets the aggressive runtime constraints necessary for disaster recovery. The algorithms were validated on benchmarks produced by the Los Alamos National Laboratory, using the infrastructure of the United States. The disaster scenarios were generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. Experimental results show that the constraint-injection algorithms can reduce the blackouts by 50% or more over field practices. Moreover, the results show that the constraint-injection algorithm using large neighborhood search over a blackbox simulator provide competitive quality and scales better than using a MIP solver on the subproblems.

Bent, Russell W [Los Alamos National Laboratory; Coffrin, Carleton [Los Alamos National Laboratory; Van Hentenryck, Pascal [BROWN UNIV.

2010-11-23T23:59:59.000Z

174

Proceedings of the Columbia River Estuary Conference on Ecosystem Restoration.  

DOE Green Energy (OSTI)

The 2008 Columbia River Estuary Conference was held at the Liberty Theater in Astoria, Oregon, on April 19-20. The conference theme was ecosystem restoration. The purpose of the conference was to exchange data and information among researchers, policy-makers, and the public, i.e., interrelate science with management. Conference organizers invited presentations synthesizing material on Restoration Planning and Implementation (Session 1), Research to Reduce Restoration Uncertainties (Session 2), Wetlands and Flood Management (Session 3), Action Effectiveness Monitoring (Session 4), and Management Perspectives (Session 5). A series of three plenary talks opened the conference. Facilitated speaker and audience discussion periods were held at the end of each session. Contributed posters conveyed additional data and information. These proceedings include abstracts and notes documenting questions from the audience and clarifying answers from the presenter for each talk. The proceedings also document key points from the discussion periods at the end of each session. The conference program is outlined in the agenda section. Speaker biographies are presented in Appendix A. Poster titles and authors are listed in Appendix B. A list of conference attendees is contained in Appendix C.

U.S. Bonneville Power Administration

2008-08-01T23:59:59.000Z

175

Geothermal Well Site Restoration and Plug and Abandonment of Wells  

DOE Green Energy (OSTI)

A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana-the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete, utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports and procedures, daily workover and current conditions report, and cost and salvage reports. Site locations, grid maps, and photographs are provided.

Rinehart, Ben N.

1994-08-01T23:59:59.000Z

176

Restoration and analysis of amateur movies from the Kennedy assassination  

SciTech Connect

Much of the evidence concerning the assassination of President Kennedy comes from amateur movies of the presidential motorcade. Two of the most revealing movies are those taken by the photographers Zapruder and Nix. Approximately 180 frames of the Zapruder film clearly show the general relation of persons in the presidential limousine. Many of the frames of interest were blurred by focus problems or by linear motion. The method of cepstral analysis was used to quantitatively measure the blur, followed by maximum a posteriori (MAP) restoration. Descriptions of these methods, complete with before-and-after examples from selected frames are given. The frames were then available for studies of facial expressions, hand motions, etc. Numerous allegations charge that multiple gunmen played a role in an assassination plot. Multispectral analyses, adapted from studies of satellite imagery, show no evidence of an alleged rifle in the Zapruder film. Lastly, frame-averaging is used to reduce the noise in the Nix movie prior to MAP restoration. The restoration of the reduced-noise average frame more clearly shows that at least one of the alleged gunmen is only the light-and-shadow pattern beneath the trees.

Breedlove, J.R.; Cannon, T.M.; Janney, D.H.; Kruger, R.P.; Trussell, H.J.

1980-01-01T23:59:59.000Z

177

Estimated Global Hydrographic Variability  

Science Conference Proceedings (OSTI)

An estimate is made of the three-dimensional global oceanic temperature and salinity variability, omitting the seasonal cycle, both as a major descriptive element of the ocean circulation and for use in the error estimates of state estimation. ...

Gaël Forget; Carl Wunsch

2007-08-01T23:59:59.000Z

178

Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk  

Science Conference Proceedings (OSTI)

Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

NONE

1995-08-01T23:59:59.000Z

179

Internal Dose Estimates from  

E-Print Network (OSTI)

Appendix F Internal Dose Estimates from NTS Fallout F-1 #12;Radiation Dose to the Population...........................................................................................40 Comparison to dose estimates from global fallout

180

Low-dose computed tomography image restoration using previous normal-dose scan  

Science Conference Proceedings (OSTI)

Purpose: In current computed tomography (CT) examinations, the associated x-ray radiation dose is of a significant concern to patients and operators. A simple and cost-effective means to perform the examinations is to lower the milliampere-seconds (mAs) or kVp parameter (or delivering less x-ray energy to the body) as low as reasonably achievable in data acquisition. However, lowering the mAs parameter will unavoidably increase data noise and the noise would propagate into the CT image if no adequate noise control is applied during image reconstruction. Since a normal-dose high diagnostic CT image scanned previously may be available in some clinical applications, such as CT perfusion imaging and CT angiography (CTA), this paper presents an innovative way to utilize the normal-dose scan as a priori information to induce signal restoration of the current low-dose CT image series. Methods: Unlike conventional local operations on neighboring image voxels, nonlocal means (NLM) algorithm utilizes the redundancy of information across the whole image. This paper adapts the NLM to utilize the redundancy of information in the previous normal-dose scan and further exploits ways to optimize the nonlocal weights for low-dose image restoration in the NLM framework. The resulting algorithm is called the previous normal-dose scan induced nonlocal means (ndiNLM). Because of the optimized nature of nonlocal weights calculation, the ndiNLM algorithm does not depend heavily on image registration between the current low-dose and the previous normal-dose CT scans. Furthermore, the smoothing parameter involved in the ndiNLM algorithm can be adaptively estimated based on the image noise relationship between the current low-dose and the previous normal-dose scanning protocols. Results: Qualitative and quantitative evaluations were carried out on a physical phantom as well as clinical abdominal and brain perfusion CT scans in terms of accuracy and resolution properties. The gain by the use of the previous normal-dose scan via the presented ndiNLM algorithm is noticeable as compared to a similar approach without using the previous normal-dose scan. Conclusions: For low-dose CT image restoration, the presented ndiNLM method is robust in preserving the spatial resolution and identifying the low-contrast structure. The authors can draw the conclusion that the presented ndiNLM algorithm may be useful for some clinical applications such as in perfusion imaging, radiotherapy, tumor surveillance, etc.

Ma, Jianhua; Huang, Jing; Feng, Qianjin; Zhang, Hua; Lu, Hongbing; Liang, Zhengrong; Chen, Wufan [Department of Biomedical Engineering, Southern Medical University, Guangzhou, Guangdong 510515, China and Department of Radiology, State University of New York, Stony Brook, New York 11794 (United States); Department of Biomedical Engineering, Southern Medical University, Guangzhou, Guangdong 510515 (China); Department of Biomedical Engineering, Fourth Military Medical University, Xi'An, Shanxi 710032 (China); Department of Radiology, State University of New York, Stony Brook, New York 11794 (United States); Department of Biomedical Engineering, Southern Medical University, Guangzhou, Guangdong 510515 (China)

2011-10-15T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

HAZARD CATEGORIZATION OF ENVIRONMENTAL RESTORATION SITES AT HANFORD WASHINGTON  

SciTech Connect

Environmental restoration activities, defined here as work to identify and characterize contaminated sites and then contain, treat, remove or dispose of the contamination, now comprises a significant fraction of work in the DOE complex. As with any other DOE activity, a safety analysis must be in place prior to commencing restoration. The rigor and depth of this safety analysis is in part determined by the site's hazard category. This category in turn is determined by the facility's hazardous material inventory and the consequences of its release. Progressively more complicated safety analyses are needed as a facility's hazard category increases from radiological to hazard category three (significant local releases) to hazard category two (significant on-site releases). Thus, a facility's hazard category plays a crucial early role in helping to determine the level of effort devoted to analysis of the facility's individual hazards. Improper determination of the category can result in either an inadequate safety analysis in the case of underestimation of the hazard category, or an unnecessarily cumbersome analysis in the case of overestimation. Contaminated sites have been successfully categorized and safely restored or remediated at the former DOE production site at Hanford, Washington. This paper discusses various means used to categorize former plutonium production or support sites at Hanford. Both preliminary and final hazard categorization is discussed. The importance of the preliminary (initial) hazard categorization in guiding further DOE involvement and approval of the safety analyses is discussed. Compliance to DOE direction provided in ''Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports'', DOE-STD-1027-92, is discussed. DOE recently issued 10 CFR 830, Subpart B which codifies previous DOE safety analysis guidance and orders. The impact of 10 CFR 830, Subpart B on hazard categorization is also discussed.

BISHOP, G.E.

2001-05-01T23:59:59.000Z

182

A Framework for Risk Analysis for Ecological Restoration Projects in the U.S. Army Corps of Engineers  

SciTech Connect

This report provides a framework for incorporating risk analysis into the six-step planning process for ecosystem restoration projects. This report is part of a larger research and development effort to develop procedures and guidelines for risk analysis in USACE ecosystem restoration planning. The focus is on risk analysis: identifying the range of possible outcomes from alternative ecosystem restoration actions, assessing the potential for achieving the desired outcome, characterizing the likelihood of adverse consequences, and communicating these findings to stakeholders and decision makers. This framework document makes simplifying assumptions to allow a focus on incorporating risk information in the planning and decision-making process. A conceptual model of the site and landscape is advocated as a central organizing structure within the six-step process for ecosystem restoration project planning. This is responsive to USACE directives that restoration projects be conceived in a systems context using an ecosystem and/or watershed approach. The conceptual model delineates the empirical quantities to be addressed in risk analysis and modeling. Although the planning process is described in six distinct steps, in practice these steps are iterative and often carried out simultaneously. Risk analysis within this context has the same character. The approach for incorporating risk analysis into the planning process provides direction intended to help the planner: • Identify the levels of uncertainty that are acceptable, at the start of the planning process. • Use conceptual and numerical models to communicate the planning team’s understanding of the ecosystem to others, and reduce the risk of mis-specifying the system. • Consider the uncertainty associated with the variables chosen to measure project effects. • Use alternative designs to manage identified uncertainty. • Use risk information to eliminate alternatives with unacceptable risk from consideration. • Incorporate risk analysis into the USACE four criteria of effectiveness, efficiency, completeness, and acceptability. • Use an alternative’s irreducible uncertainty as an attribute to be considered along with other attributes in the comparison of alternative plans. • Use risk information in the final plan selection process. There are three other efforts associated with this framework document, which offer information and guidance for incorporating risk analysis into cost-estimation, and biological and hydrologic modeling.

Diefenderfer, Heida L.; Thom, Ronald M.; Hofseth, Keith

2005-01-03T23:59:59.000Z

183

Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Year-in-Review: 2010 Year-in-Review: 2010 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy August 2011 OE/ISER Report 8/31/11 i For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific questions about information in this report may be directed to Alice Lippert, Senior Technical Advisor (alice.lippert@hq.doe.gov). Contributors include Mindi Farber-DeAnda, Robert Laramey, Carleen Lewandowski, Max

184

IMPACTS OF SAFETY & QUALITY IN ENVIRONMENTAL RESTORATION AT HANFORD  

Science Conference Proceedings (OSTI)

The aim of this paper is to demonstrate the integration of safety methodology, quality tools, leadership, and teamwork at Hanford and their significant positive impact on safe performance of work. Control charts, Pareto Charts, Dr. W. Edward Deming's Red Bead Experiment, and Dr. Deming's System of Profound Knowledge have been the principal tools and theory of an integrated management system. Coupled with involved leadership and teamwork they have led to significant improvements in worker safety and protection, and environmental restoration at one of the nation's largest nuclear cleanup sites.

PREVETTE, S.S.

2004-07-26T23:59:59.000Z

185

Environmental restoration and decontamination & decommissioning safety documentation. Revision 2  

SciTech Connect

This document presents recommendations of a working group designated by the Environmental Restoration and Remediation (ER) and Decontamination and Decommissioning (D&D) subcommittees of the Westinghouse M&O (Management and Operation) Nuclear Facility Safety Committee. A commonalty of approach to safety documentation specific to ER and D&D activities was developed and is summarized below. Allowance for interpretative tolerance and documentation flexibility appropriate to the activity, graded for hazard category, duration, and complexity, was a primary consideration in development of this guidance.

Hansen, J.L. [Westinghouse Savannah River Co., Aiken, SC (United States); Frauenholz, L.H. [Westinghouse Idaho Nuclear Co., Inc. (United States); Kerr, N.R. [Westinghouse Hanford Co., Richland, WA (United States)

1993-05-18T23:59:59.000Z

186

Sandy River Delta Habitat Restoration Project, Annual Report 2001.  

SciTech Connect

The Sandy River Delta is located at the confluence of the Sandy and Columbia Rivers, just east of Troutdale, Oregon. It comprises about 1,400 land acres north of Interstate 84, managed by the USDA Forest Service, and associated river banks managed by the Oregon Division of State Lands. Three islands, Gary, Flag and Catham, managed by Metro Greenspaces and the State of Oregon lie to the east, the Columbia River lies to the north and east, and the urbanized Portland metropolitan area lies to the west across the Sandy River. Sandy River Delta was historically a wooded, riparian wetland with components of ponds, sloughs, bottomland woodland, oak woodland, prairie, and low and high elevation floodplain. It has been greatly altered by past agricultural practices and the Columbia River hydropower system. Restoration of historic landscape components is a primary goal for this land. The Forest Service is currently focusing on restoration of riparian forest and wetlands. Restoration of open upland areas (meadow/prairie) would follow substantial completion of the riparian and wetland restoration. The Sandy River Delta is a former pasture infested with reed canary grass, blackberry and thistle. The limited over story is native riparian species such as cottonwood and ash. The shrub and herbaceous layers are almost entirely non-native, invasive species. Native species have a difficult time naturally regenerating in the thick, competing reed canary grass, Himalayan blackberry and thistle. A system of drainage ditches installed by past owners drains water from historic wetlands. The original channel of the Sandy River was diked in the 1930's, and the river diverted into the ''Little Sandy River''. The original Sandy River channel has subsequently filled in and largely become a slough. The FS acquired approximately 1,400 acres Sandy River Delta (SRD) in 1991 from Reynolds Aluminum (via the Trust for Public Lands). The Delta had been grazed for many years but shortly after FS acquisition grazing was terminated while a master plan and Environmental Impact Statement (EIS) were developed for the site. During the following three years, the vegetation changed dramatically as a result of cessation of grazing. The dramatic changes included the explosive increases of reed canary grass monocultures in wet areas and the expansion of Himalayan blackberries throughout the site.

Kelly, Virginia; Dobson, Robin L.

2002-11-01T23:59:59.000Z

187

Pacific Lamprey Research and Restoration : Annual Report 1997.  

Science Conference Proceedings (OSTI)

The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations as well. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of the Umatilla Indian Reservation, the Columbia River Inter-Tribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam.

Jackson, Aaron D.; Hatch, Douglas R.; Close, David A.

1998-08-05T23:59:59.000Z

188

Software Cost Estimation  

E-Print Network (OSTI)

Software cost estimation is the process of predicting the effort required to develop a software system. Many estimation models have been proposed over the last 30 years. This paper provides a general overview of software cost estimation methods including the recent advances in the field. As a number of these models rely on a software size estimate as input, we first provide an overview of common size metrics. We then highlight the cost estimation models that have been proposed and used successfully. Models may be classified into 2 major categories: algorithmic and non-algorithmic. Each has its own strengths and weaknesses. A key factor in selecting a cost estimation model is the accuracy of its estimates. Unfortunately, despite the large body of experience with estimation models, the accuracy of these models is not satisfactory. The paper includes comment on the performance of the estimation models and description of several newer approaches to cost estimation.

Hareton Leung Zhang; Zhang Fan

2002-01-01T23:59:59.000Z

189

Beneficial Use of Drilling Waste - A Wetland Restoration Technology  

SciTech Connect

This project demonstrated that treated drill cuttings derived from oil and gas operations could be used as source material for rebuilding eroding wetlands in Louisiana. Planning to supply a restoration site, drill a source well, and provide part of the funding. Scientists from southeastern Louisiana University's (SLU) Wetland Biology Department were contracted to conduct the proposed field research and to perform mesocosm studies on the SLU campus. Plans were to use and abandoned open water drill slip as a restoration site. Dredged material was to be used to create berms to form an isolated cell that would then be filled with a blend of dredged material and drill cuttings. Three elevations were used to test the substrates ability to support various alternative types of marsh vegetation, i.e., submergent, emergent, and upland. The drill cuttings were not raw cuttings, but were treated by either a dewatering process (performed by Cameron, Inc.) or by a stabilization process to encapsulate undesirable constituents (performed by SWACO, Division of Smith International).

Pioneer Natural Resources

2000-08-14T23:59:59.000Z

190

Prototyping a Decision Support Tool for Evaluation of System Restoration Strategy Options  

Science Conference Proceedings (OSTI)

Power system restoration is well recognized as one of the most important tasks for grid operations. Following a major power outage, operators in the control center work with the field crews to re-establish generation and transmission systems and then to pick up load and restore service. It is reported that the impact of a blackout increases with the duration of its restoration. Blackout events and aging transmission infrastructures in North America require that greater attention be paid to research and d...

2009-12-01T23:59:59.000Z

191

Audit of Environmental Restoration at the Los Alamos National Laboratory. IG-0410  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John C. Layton John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of Environmental Restoration at the Los Alamos National Laboratory" BACKGROUND: The Los Alamos National Laboratory (Los Alamos) Environmental Restoration Program was primarily monitored by the U.S. Environmental Protection Agency (EPA) and the New Mexico Environment Department (NMED). However, in 1995, the Department of Energy (DOE) and Los Alamos adopted a performance-based management approach to contracting to hold Los Alamos more accountable for its Environmental Restoration Program. At Los Alamos, the Environmental Restoration Program's mission is to remediate sites contaminated with various forms of hazardous,

192

Collecting mixed waste information for Department of Energy Environmental Restoration activities  

SciTech Connect

The US Department of Energy (DOE) Office of Environmental Restoration is currently developing an integrated data structure to link information on wastes and contaminated media from environmental restoration activities with other program information, including waste management plans. Mixed wastes are a key element of this data system because of the reporting requirements of the recent Federal Facility Compliance Act. The first step taken to satisfy various environmental restoration program needs was to develop a data call that would capture information on contamination and cleanup projections for all environmental restoration sites.

Tolbert-Smith, M. [Dept. of Energy, Germantown, MD (United States); MacDonell, M.; Peterson, J. [Argonne National Lab., IL (United States)

1994-03-01T23:59:59.000Z

193

Review: Human Dimensions of Ecological Restoration: Integrating Science, Nature, and Culture  

E-Print Network (OSTI)

Jamie L. Conklin, MLIS. , Science andHealth Sciences Librarian, Lovejoy Library, SouthernRestoration: Integrating Science, Nature, and Culture Dave

Conklin, Jamie L

2013-01-01T23:59:59.000Z

194

E6 Restoration Process of Face-Centered-Cubic Metals Subjected ...  

Science Conference Proceedings (OSTI)

... the kinetic spraying process, they undergo the severe plastic deformation and restoration process. Due to the difference in stacking fault energy (SFE) of FCC ...

195

Baxter Creek Gateway Park: assessment of an urban stream restoration project  

E-Print Network (OSTI)

Restoration Project: Maintenance and Management Guide. Citythe Baxter Creek Maintenance and Management Guide and thatEOA, 2005), Maintenance & Management Guide (El Cerrito,

Goodman, Judd; Lunde, Kevin B; Zaro, Theresa

2006-01-01T23:59:59.000Z

196

The Fun Never Stops--Ten Years of Environmental Restoration Success at Sandia National Laboratories  

SciTech Connect

This paper provides an overview of the many contributors to the success of the Environmental Restoration Project at Sandia National Laboratories between 1992 and 2002.

Nimick, F. B.

2003-02-25T23:59:59.000Z

197

Sharp-tailed Grouse Restoration; Colville Tribes Restore Habitat for Sharp-tailed Grouse, Annual Report 2002-2003.  

DOE Green Energy (OSTI)

Columbian Sharp-Tailed Grouse (Tympanuchus phasianellus columbianus) (CSTG) are an important traditional and cultural species to the Colville Confederated Tribes (CCT), Spokane Tribe of Indians (STOI), and other Tribes in the Region. They were once the most abundant upland bird in the Region. Currently, the largest remaining population in Washington State occurs on the CCT Reservation in Okanogan County. Increasing agricultural practices and other land uses has contributed to the decline of sharp-tail habitat and populations putting this species at risk. The decline of this species is not new (Yokum, 1952, Buss and Dziedzic, 1955, Zeigler, 1979, Meints 1991, and Crawford and Snyder 1994). The Tribes (CCT and STOI) are determined to protect, enhance and restore habitat for this species continued existence. When Grand Coulee and Chief Joseph Hydro-projects were constructed, inundated habitat used by this species was lost forever adding to overall decline. To compensate and prevent further habitat loss, the CCT proposed a project with Bonneville Power Administration (BPA) funding to address this species and their habitat requirements. The projects main focus is to address habitat utilized by the current CSTG population and determine ways to protect, restore, and enhance habitats for the conservation of this species over time. The project went through the NPPC Review Process and was funded through FY03 by BPA. This report addresses part of the current CCT effort to address the conservation of this species on the Colville Reservation.

Whitney, Richard

2004-01-01T23:59:59.000Z

198

Statistics of Sxy Estimates  

Science Conference Proceedings (OSTI)

The statistics of Sxy estimates derived from orthogonal-component measurements are examined. Based on results of Goodman, the probability density function (pdf) for Sxy(f) estimates is derived, and a closed-form solution for arbitrary moments of ...

M. H. Freilich; S. S. Pawka

1987-10-01T23:59:59.000Z

199

Cost Estimation Recommendations  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

200

Nevada Environmental Restoration Project Natfonal Nuclenr Security Adminlstratlon  

Office of Legacy Management (LM)

Natfonal Nuclenr Security Adminlstratlon Natfonal Nuclenr Security Adminlstratlon Amchitka Island Surface Closure Report Revision No.: 1 July 2003 Approved for public release; further dissemination unlimited. Environmental Restoration L Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22 16 1 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@,ntis,fedworld.~ov Online ordering: htt~:/hZww.ntis.~ov/ordering. htm Available electronically at htt~://www.doe.nov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 3783 1-0062 Phone: 865.576.8401

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Jefferson Lab Science Series - The Restoration of the USS Monitor  

NLE Websites -- All DOE Office Websites (Extended Search)

A TACT-ful Chemical Musical A TACT-ful Chemical Musical Previous Video (A TACT-ful Chemical Musical) Science Series Video Archive Next Video (Einstein for Everyone) Einstein for Everyone The Restoration of the USS Monitor David Krop - Conservation Project Manager, The Mariner's Museum March 2, 2010 The ongoing efforts to conserve and exhibit the iconic Civil War ironclad USS Monitor at The Mariners' Museum will be discussed. The presentation will cover past conservation accomplishments by conservators and NOAA specialists, current activities in the lab, and future plans to bring back to life one of the world's most famous warships. Learn about the complex methods and procedures used to treat the ship's revolving gun turret, steam engine, Dahlgren guns and carriages, as well as numerous small artifacts

202

Nevada Environmental Restoration Project Amchitka Mud Pit Sites  

Office of Legacy Management (LM)

Amchitka Mud Pit Sites Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report Amchitka Island, Alaska Revision No.: 0 September 2006 Environmental Restoration Project U.S. Department of Energy National Nuclear Security Administration Nevada Site Office, Available for public sale, in paper, from: U.S. Department of Cornrn&ce National Technical Information Service 5285 Port Royal Road Springfield, VA 22 1 6 1 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@,ntis. aov Online ordering: htt~://www. ntis. nov/orderinn. htm Available electronically at htt~://www. osti. godbridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information

203

Microwave methods enable energy savings in restoration of highway pavements  

Science Conference Proceedings (OSTI)

Hot in place recycling of asphalt pavement by a method which utilizes microwave energy in combination with hot engine exhaust gases has been demonstrated to be technically and economically feasible. The process saves both energy and materials compared with conventional hot-mix recycling methods involving removal of old paving and reprocessing at hot-mix plants. Applications for microwave pavement heating include repair of cracks, joints between lanes and shoulders, wheel tracks, bridge decks, strip patching, and eventually in-place of full lanes of asphalt highways. The ability of microwave energy to heat pavements rapidly and fairly uniformly to depths of up to 6 inches make this new method uniquely suitable for repair and restoration of bridges, roads and highways, and also for the construction of new paved roads in places where hot-mix plants are not available.

Jeppson, M.R.; Smith, F.J.

1983-08-01T23:59:59.000Z

204

Microwave methods enable energy savings in restoration of highway pavements  

Science Conference Proceedings (OSTI)

Hot in-place recycling of asphalt pavement by a method which utilizes microwave energy in combination with hot-engine exhaust gases has been demonstrated to be technically and economically feasible. The process saves both energy and materials compared with conventional hot-mix recycling methods involving removal of old paving and reprocessing at hot-mix plants. Applications for microwave pavement heating include repair of cracks, joints between lanes and shoulders, wheel tracks, bridge decks, strip patching, and eventually in-place recycling of full lanes of asphalt highways. The ability of microwave energy to heat pavements rapidly and fairly uniformly to depths of up to 6 inches make this new method uniquely suitable for repair and restoration of bridges, roads and highways, and also for the construction of new paved roads in places where hot-mix plants are not available.

Jeppson, M.R.; Smith, F.J.

1983-01-01T23:59:59.000Z

205

Ecological risks of DOE`s programmatic environmental restoration alternatives  

SciTech Connect

This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representative facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.

Not Available

1994-06-01T23:59:59.000Z

206

Second annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory  

Science Conference Proceedings (OSTI)

This report summarizes the salient features of the annual efforts of environmental monitoring and field investigations conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, striving to provide an ORNL site-wide perspective on types, distribution, and transport of contamination. Results are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) program. WAG 2 is the lower portion of the White Oak Creek (WOC) system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The remedial investigation for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and conduit of contaminants from the ORNL site. This report also includes information from other site-specific remedial investigations and feasibility studies (RI/FS) for contaminated sites at ORNL and data from other ongoing monitoring programs conducted by other organizations [e.g., the National Pollutant Discharge Elimination System (NPDES) compliance monitoring conducted by the Environmental Surveillance and Protection Section]. This information is included to provide an integrated basis to support ER decision making. This report summarizes information gathered through early 1993. Annual data, such as annual discharges of contaminants, are reported for calendar year 1992.

Clapp, R.B.; Watts, J.A. [eds.

1993-09-01T23:59:59.000Z

207

Pacific Lamprey Research and Restoration : Annual Report 1996.  

Science Conference Proceedings (OSTI)

The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations. The Pacific lamprey is an important part of the food web of North Pacific ecosystems, both as predator and prey. Lamprey (a.k.a. eels) are also a valuable food and culture resource for American Indian Tribes of the Pacific Northwest. Depressed Pacific lamprey runs have impacted treaty secured fishing opportunities by forcing tribal members to gather this traditional food in lower Columbia River locations. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of The Umatilla Indian Reservation, the Columbia River Intertribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam. The initial objectives of the project are to determine the past and current abundance of Pacific lamprey stocks in major mid Columbia tributaries and at various hydroelectric facilities, and to determine factors limiting Pacific lamprey abundance and distribution. Ultimately, Pacific lamprey restoration plans will be developed and implemented. Part (A)-CTUIR: (1) determine past and present abundance and distribution in NE Oregon and SE Washington tributaries; and (2) determine limiting habitat factors. Part (B)-CRITFC: (1) adult abundance monitoring at Columbia and Snake River dams; (2) juvenile abundance monitoring at Columbia and Snake River dams; and (3) juvenile passage impediments and needed improvements at Columbia and Snake River dams. Part (C)- OSU: (1) adult passage impediments and needed improvements at Columbia and Snake River dams; and (2) juvenile passage impediments and needed improvements at Columbia and Snake River dams.

Jackson, Aaron D.

1997-01-01T23:59:59.000Z

208

Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program  

SciTech Connect

This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.

1992-04-29T23:59:59.000Z

209

RSLDI: Restoration of single-sided low-quality document images  

Science Conference Proceedings (OSTI)

This paper addresses the problem of enhancing and restoring single-sided low-quality single-sided document images. Initially, a series of multi-level classifiers is introduced covering several levels, including the regional and content levels. These ... Keywords: Bayes modeling, Classifiers, Degradation modeling, Document enhancement and restoration, ICA, Nonlinear model, PDE-based image processing

Reza Farrahi Moghaddam; Mohamed Cheriet

2009-12-01T23:59:59.000Z

210

A unified framework for document restoration using inpainting and shape-from-shading  

Science Conference Proceedings (OSTI)

We present a restoration framework to reduce undesirable distortions in imaged documents. Our framework is based on two components: (1) an image inpainting procedure that can separate non-uniform illumination (and other) artifacts from the printed content ... Keywords: Digital inpainting, Document image restoration, Geometric warping, Perspective distortion, Physically based flattening, RBF-based smoothing, Shading distortion, Shape-from-shading

Li Zhang; A. M. Yip; M. S. Brown; Chew Lim Tan

2009-11-01T23:59:59.000Z

211

Modeling and simulation of new configuration of dynamic voltage restorer for power quality improvement  

Science Conference Proceedings (OSTI)

The dynamic voltage restorer (DVR) is a custom device that is used to maintain the voltage at the load terminals from various power quality problems from a disturbed incoming supply. In this paper, a novel control strategy is described for mitigation ... Keywords: custom device, dynamic voltage restorer (DVR), power quality, sags, sensitive loads, swells

Rosli Omar; Nasrudin Abdul Rahim

2011-04-01T23:59:59.000Z

212

Paraconsistent Case-Based Reasoning Applied to a Restoration of Electrical Power Substations  

Science Conference Proceedings (OSTI)

This paper presents a connection of two techniques applied in Artificial Intelligence to solve problems of restoration of electrical power substations. The techniques are: Case-based Reasoning --- CBR and the Four-Valued Annotated Paraconsistent Logic ... Keywords: CBR, Case-based Reasoning, Decision Support System, Intelligent System, Paraconsistent Logic, Restoration of Electrical Power Substations

Helga Gonzaga Martins; Germano Lambert-Torres; Luiz Eduardo Borges Da Silva; Claudio Inácio Almeida Costa; Maurilio Pereira Coutinho

2008-10-01T23:59:59.000Z

213

Steady-state power flow modeling for a dynamic voltage restorer  

Science Conference Proceedings (OSTI)

This paper presents analysis, modeling and simulation of power distribution network performance incorporating with an installed dynamic voltage restorer (DVR). DVR is one of series compensators used in power distribution systems in order to maintain ... Keywords: Gauss-Seidel method, dynamic voltage restorer, modeling, power flow, simulation

T. Ratniyomchai; T. Kulworawanichpong

2006-03-01T23:59:59.000Z

214

A Survey on the Principle and Control of Dynamic Voltage Restorer  

Science Conference Proceedings (OSTI)

With the development of information and automation techniques, dynamic voltage problems are once again in the spotlight. Dynamic voltage restorer (DVR) is a modern and important custom power device used for mitigating voltage sags in power distribution ... Keywords: voltage sag, dynamic voltage restorer (DVR), control strategy, power quality, optimized compensation, energy storage

Shuhong Kong; Zhongdong Yin; Renzhong Shan; Weidong Shang

2009-10-01T23:59:59.000Z

215

Minimum Energy Compensation Strategy and Characteristic Analysis for Dynamic Voltage Restorer  

Science Conference Proceedings (OSTI)

The minimum energy compensation strategy and its characteristic for Dynamic Voltage Restorer (DVR) considering the equipment’s voltage limitation are discussed. The strategy when the injection voltage is under or especially above the voltage limitation ... Keywords: dynamic voltage restorer, minimum energy compensation, compensation strategy, compensation characteristic, voltage limitation

Yingying Liu; Xu Yonghai; Xiao Xiangning; Guo Chunlin

2009-10-01T23:59:59.000Z

216

Mitigation of different type voltage sags in low voltage distribution systems using dynamic voltage restorer  

Science Conference Proceedings (OSTI)

The main problems of the voltage sag in low voltage distribution systems due to sensitive loads. Voltage sags can caused malfunction in the distribution system. In order to protect voltage sags in the network a device which called Dynamic Voltage Restorer ... Keywords: custom device, dynamic voltage restorer (DVR), low voltage, power injected, voltage sag

Rosli Omar

2010-03-01T23:59:59.000Z

217

Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93  

Science Conference Proceedings (OSTI)

The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones.

Not Available

1993-01-15T23:59:59.000Z

218

Questions and Answers - Does gravity affect atoms?  

NLE Websites -- All DOE Office Websites (Extended Search)

and Answers Main Index Next Question (Can you crush atoms?) Can you crush atoms? Does gravity affect atoms? Gravity affects atoms the same way it affects all other matter. Every...

219

ANL Technical Support Program for DOE Environmental Restoration and Waste Management; Annual report, October 1992--September 1993  

SciTech Connect

This report is an overview of the progress during FY 1993 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defense Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are anticipated to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: reviewing and evaluating available data on parameters that will be important in establishing the long-term performance of glass in a repository environment; performing tests to further quantify the effects of important variables where there are deficiencies in the available data; and initiating long-term tests to determine glass performance under a range of conditions applicable to repository disposal.

Bates, J.K.; Bourcier, W.L.; Bradley, C.R. [and others

1994-06-01T23:59:59.000Z

220

ANL Technical Support Program for DOE Environmental Restoration and Waste Management. Annual report, October 1990--September 1991  

SciTech Connect

This report provides an overview of progress during FY 1991 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE, Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defenses Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are likely to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: (1) to review and evaluate available information on parameters that will be important in establishing the long-term performance of glass in a repository environment; (2) to perform testing to further quantify the effects of important variables where there are deficiencies in the available data; and (3) to initiate long-term testing that will bound glass performance under a range of conditions applicable to repository disposal.

Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J. [Argonne National Lab., IL (United States); Bourcier, W.L.; Morgan, L.E.; Nielsen, J.K.; Steward, S.A. [Lawrence Livermore National Lab., CA (United States); Ewing, R.C.; Wang, L.M. [New Mexico Univ., Albuquerque, NM (United States); Han, W.T.; Tomozawa, M. [Rensselaer Polytechnic Inst., Troy, MI (United States)

1992-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Ensemble State Estimation for Nonlinear Systems Using Polynomial Expansions in the Innovation  

Science Conference Proceedings (OSTI)

A new framework is presented for understanding how a nonnormal probability density function (pdf) may affect a state estimate and how one might usefully exploit the nonnormal properties of the pdf when constructing a state estimate. A Bayesian ...

Daniel Hodyss

2011-11-01T23:59:59.000Z

222

A Study of the Error Covariance Matrix of Radar Rainfall Estimates in Stratiform Rain  

Science Conference Proceedings (OSTI)

The contribution of various physical sources of uncertainty affecting radar rainfall estimates at the ground is quantified toward deriving and understanding the error covariance matrix of these estimates. The focus here is on stratiform ...

Marc Berenguer; Isztar Zawadzki

2008-12-01T23:59:59.000Z

223

Fixture conditions affect lamp performance  

SciTech Connect

This article discusses the major parameters that affect fluorescent lamp performance under fixture conditions. These parameters include fixture type, and HVAC integration, which directly determine the minimum lamp wall temperature (MLWT), and therefore, the resulting light output of the lamp/ballast system. Experimental data is presented showing that the lumen output of the lamp/ballast system can vary by as much as 20% and that the system efficacy can vary by 10% depending upon the type of fixture and HVAC system employed. 4 refs., 5 figs., 1 tab.

Siminovitch, M.J.; Rubinstein, F.M.; Verderber, R.R.

1986-11-01T23:59:59.000Z

224

Operational restoration of the Pen Branch bottomland hardwood and swamp wetlands - the research setting  

Science Conference Proceedings (OSTI)

The Savannah River Swamp is a 3020 Ha forested wetland on the floodplain of the Savannah River and is located on the Department of Energy's Savannah River Site (SRS) near Aiken, SC. Historically the swamp consisted of approximately 50 percent bald cypress-water tupelo stands, 40 percent mixed bottomland hardwood stands, and 10 percent shrub, marsh, and open water. Creek corridors were typical of Southeastern bottomland hardwood forests. The hydrology was controlled by flooding of the Savannah River and by flow from four creeks that drain into the swamp prior to flow into the Savannah River. Upstream dams have caused some alteration of the water levels and timing of flooding within the floodplain. Major impacts to the swamp hydrology occurred with the completion of the production reactors and one coal-fired powerhouse at the SRS in the early 1950's. Water was pumped from the Savannah River, through secondary heat exchangers of the reactors, and discharged into three of the tributary streams that flow into the swamp. Flow in one of the tributaries, Pen Branch, was typically 0.3 m3 s-1 (10-20) cfs prior to reactor pumping and 11.0 m3 s-1 (400 cfs) during pumping. This continued from 1954 to 1988 at various levels. The sustained increases in water volume resulted in overflow of the original stream banks and the creation of additional floodplains. Accompanying this was considerable erosion of the original stream corridor and deposition of a deep silt layer on the newly formed delta. Heated water was discharged directly into Pen Branch and water temperature in the stream often exceeded 65 degrees C. The nearly continuous flooding of the swamp, the thermal load of the water, and the heavy silting resulted in complete mortality of the original vegetation in large areas of the floodplain. In the years since pumping was reduced, early succession has begun in some affected areas. Most of this has been herbs, grasses, and shrubs. Areas that have seedlings are generally willow thickets that support a lower diversity of wildlife. No volunteer seedlings of heavy-seeded hardwoods or cypress have been found in the corridor areas. Research was conducted to determine methods to reintroduce tree species characteristic of more mature forested wetlands. Three restoration strategies were formulated to deal with the differing conditions of the Upper Corridor, the Lower Corridor, and the Delta regions of the impacted area. Site preparation and planting of each area with mixtures of tree species were carried out to speed the restoration of the ecosystem. Species composition and selection were altered based on the current and expected hydrological regimes that the reforestation areas will be experiencing. Because of the operational design of the restoration project, a research program naturally followed to document the success. Many of those efforts are detailed here.

Nelson, E.A.

2000-01-05T23:59:59.000Z

225

RESTORING SUSTAINABLE FORESTS ON APPALACHIAN MINED LANDS FOR WOOD PRODUCTS, RENEWABLE ENERGY, CARBON SEQUESTRATION, AND OTHER ECOSYSTEM SERVICES  

DOE Green Energy (OSTI)

The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. In this quarterly report, we present a preliminary comparison of the carbon sequestration benefits for two forest types used to convert abandoned grasslands for carbon sequestration. Annual mixed hardwood benefits, based on total stand carbon volume present at the end of a given year, range from a minimum of $0/ton of carbon to a maximum of $5.26/ton of carbon (low prices). White pine benefits based on carbon volume range from a minimum of $0/ton of carbon to a maximum of $18.61/ton of carbon (high prices). The higher maximum white pine carbon payment can primarily be attributed to the fact that the shorter rotation means that payments for white pine carbon are being made on far less cumulative carbon tonnage than for that of the long-rotation hardwoods. Therefore, the payment per ton of white pine carbon needs to be higher than that of the hardwoods in order to render the conversion to white pine profitable by the end of a rotation. These carbon payments may seem appealingly low to the incentive provider. However, payments (not discounted) made over a full rotation may add up to approximately $17,493/ha for white pine (30-year rotation), and $18,820/ha for mixed hardwoods (60-year rotation). The literature suggests a range of carbon sequestration costs, from $0/ton of carbon to $120/ton of carbon, although the majority of studies suggest a cost below $50/ ton of carbon, with van Kooten et al. (2000) suggesting a cutoff cost of $20/ton of carbon sequestered. Thus, the ranges of carbon payments estimated for this study fall well within the ranges of carbon sequestration costs estimated in previous studies.

J. Burger; J. Galbraith; T. Fox; G. Amacher; J. Sullivan; C. Zipper

2003-12-18T23:59:59.000Z

226

Derived Annual Estimates  

U.S. Energy Information Administration (EIA) Indexed Site

For Methodology Concerning the Derived Estimates Total Consumption of Offsite-Produced Energy for Heat and Power by Industry Group, 1988-1998 Total Energy *** Electricity ***...

227

Derived Annual Estimates  

U.S. Energy Information Administration (EIA) Indexed Site

For Methodology Concerning the Derived Estimates Total Consumption of Offsite-Produced Energy for Heat and Power by Industry Group, 1974-1988 Total Energy *** Electricity ***...

228

Estimating Corn Grain Yields  

E-Print Network (OSTI)

This publication explains how to estimate the grain yield of a corn crop before harvest. An interactive grain yield calculator is included. 6 pages, 3 tables, 1 figure.

Blumenthal, Jurg M.; Thompson, Wayne

2009-06-12T23:59:59.000Z

229

Radio link quality estimation in wireless sensor networks: A survey  

Science Conference Proceedings (OSTI)

Radio link quality estimation in Wireless Sensor Networks (WSNs) has a fundamental impact on the network performance and also affects the design of higher-layer protocols. Therefore, for about a decade, it has been attracting a vast array of research ... Keywords: Link quality estimation, link characteristics, low-power links, wireless sensor networks

Nouha Baccour; Anis Koubâa; Luca Mottola; Marco Antonio Zúńiga; Habib Youssef; Carlo Alberto Boano; Mário Alves

2012-09-01T23:59:59.000Z

230

Assess Current and Potential Salmonid Production in Rattlesnake Creek Associated with Restoration Efforts; Underwood Conservation District, Annual Report 2002-2003.  

DOE Green Energy (OSTI)

This project addresses existing habitat conditions, fish population status, and restoration priority sites within the Rattlesnake Creek watershed, a sub-basin of the White Salmon River. Our partners in this project are the United States Geological Service (USGS), and the Yakama Indian Nation (YIN). Underwood Conservation District (UCD) is involved in the project via accomplishment of water quality monitoring, sampling for stable isotopes, and characterization of the watershed geomorphology. These work items are part of an effort to characterize the stream and riparian habitat conditions in Rattlesnake Creek, to help guide habitat and fish restoration work. Water chemistry and temperature information is being collected both on Rattlesnake Creek, and on other tributaries and the main stem of the White Salmon River. Information on the entire system enables us to compare results obtained from Rattlesnake Creek with the rest of the White Salmon system. Water chemistry and temperature data have been collected in a manner that is comparable with data gathered in previous years. The results from data gathered in the 2001-2002 performance period are reported in appendix A at the end of this 2002-2003 report. Additional work being conducted as part of this study includes; an estimate of salmonid population abundance (YIN and USGS); a determination of fish species composition, distribution, and life history (YIN and USGS), and a determination of existing kinds, distribution, and severity of fish diseases (YIN and USGS). The overall objective is to utilize the above information to prioritize restoration efforts in Rattlesnake Creek.

White, Jim

2004-02-01T23:59:59.000Z

231

Restoration and testing of an HTS fault current controller  

Science Conference Proceedings (OSTI)

A three-phase, 1200 A, 12.5 kV fault current controller using three HTS 4 mH coils, was built by industry and tested in 1999 at the Center Substation of Southern California Edison in Norwalk, CA. During the testing, it appeared that each of the three single-phase units had experienced a voltage breakdown, one externally and two internally. Los Alamos National Laboratory (LANL) was asked by DOE to restore the operation of the fault current controller provided the HTS coils had not been damaged during the initial substation tests. When the internally-failed coil vacuum vessels were opened it became evident that in these two vessels, a flashover had occurred at the high voltage bus section leading to the terminals of the superconducting coil. An investigation into the failure mechanism resulted in six possible causes for the flashover. Based on these causes, the high voltage bus was completely redesigned. Single-phase tests were successfully performed on the modified unit at a 13.7 kV LANL substation. This paper presents the postulated voltage flashover failure mechanisms, the new high voltage bus design which mitigates the failure mechanisms, the sequence of tests used to validate the new design, and finally, the results of variable load and short-circuit tests with the single-phase unit operating on the LANL 13.7 kV substation.

Waynert, J. A. (Joseph A.); Boenig, H. (Heinrich E.); Mielke, C. H. (Charles H.); Willis, J. O. (Jeffrey O.); Burley, B. L. (Burt L.)

2002-01-01T23:59:59.000Z

232

Nuclear criticality safety program for environmental restoration projects  

SciTech Connect

The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center (FMPC), is located on a 1050 acre site approximately twenty miles northwest of Cincinnati, Ohio. The production area of the site covers approximately 136 acres in the central portion of the site. Surrounding the core production area is a buffer consisting of leased grazing land, reforested land, and unused areas. The uranium processing facility was designed and constructed in the early 1950s. During the period from 1952 to 1989 the site produced uranium feed material and uranium products used in the United States weapons complex. Production at the site ended in 1989, when the site was shut down for what was expected to be a short period of time. However, the FUTC was permanently shut down in 1991, and the site`s mission was changed from production to environmental restoration. The objective of this paper is to give an update on activities at the Fernald Site and to describe the Nuclear Criticality Safety issues that are currently being addressed.

Marble, R.C.; Brown, T.D.

1994-05-01T23:59:59.000Z

233

Environmental monitoring, restoration and assessment: What have we learned  

Science Conference Proceedings (OSTI)

The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.

Gray, R.H. (ed.)

1990-01-01T23:59:59.000Z

234

Moses Lake Fishery Restoration Project : FY 1999 Annual Report.  

SciTech Connect

The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

None given

2000-12-01T23:59:59.000Z

235

Restoring a disappearing ecosystem: the Longleaf Pine Savanna.  

SciTech Connect

Longleaf pine (Pinus palustris) savannas of the southeastern United States contain some of the worlds most diverse plant communities, along with a unique complement of wildlife. Their traditionally open canopy structure and rich understory of grasses and herbs were critical to their vigor. However, a long history of land-use practices such as logging, farming, and fire exclusion have reduced this once-widespread ecosystem to only 3 percent of its original range. At six longleaf pine plantations in South Carolina, Tim Harrington with the Pacific Northwest Research Station and collaborators with the Southern Research Station used various treatments (including prescribed burns, tree thinning, and herbicide applications) to alter the forest structure and tracked how successful each one was in advancing savanna restoration over a 14-year period. They found that typical planting densities for wood production in plantations create dense understory shade that excludes many native herbaceous species important to savannas and associated wildlife. The scientists found that although tree thinning alone did not result in sustained gains, a combination of controlled burning, thinning, and herbicide treatments to reduce woody plants was an effective strategy for recovering the savanna ecosystem. The scientists also found that these efforts must be repeated periodically for enduring benefits.

Harrington, Timothy B. [USFS; Miller, Karl V. [University of Georgia; Park, Noreen

2013-05-01T23:59:59.000Z

236

The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites  

Energy.gov (U.S. Department of Energy (DOE))

The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites

237

Notices LIST OF AFFECTED PROGRAMS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90 Federal Register 90 Federal Register / Vol. 76, No. 175 / Friday, September 9, 2011 / Notices LIST OF AFFECTED PROGRAMS CFDA No. and name Publication date and FEDERAL REG- ISTER citation Original deadline for transmittal of applications Revised deadline for transmittal of applications Original deadline for inter-govern- mental review Extended dead- line for inter-gov- ernmental review 84.215N: Promise Neighborhoods Program- Implementation. 7/6/2011 76 FR 39615. 9/06/2011 9/13/2011 11/03/2011 11/10/2011 84.215P: Promise Neighborhoods Program- Planning. 7/06/2011 76 FR 39630. 9/06/2011 9/13/2011 11/03/2011 11/10/2011 Electronic Access to This Document The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal

238

A Review of Power Outages and Restoration Following the June 2012 Derecho |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Review of Power Outages and Restoration Following the June 2012 A Review of Power Outages and Restoration Following the June 2012 Derecho A Review of Power Outages and Restoration Following the June 2012 Derecho August 7, 2012 - 11:16am Addthis The Office of Electricity Delivery and Energy Reliability has released a report that reviews power outages and restoration efforts following the June 29, 2012 Derecho and compares them to outages and restoration efforts following other spring and summer storms in the Ohio Valley and Mid-Atlantic regions. View the Report. Addthis Related Articles Salazar, Chu Announce Major Offshore Wind Initiatives A Review of Power Outages and Restoration Following the June 2012 Derecho Response to Hurricane Irene - Restoring Power on the East Coast President Barack Obama listens to Acting Energy Secretary Daniel B. Poneman during a meeting with electric utility CEOs and trade association representatives at the Department of Energy in Washington, D.C., May 8, 2013. | Official White House Photo by Pete Souza.

239

Cooling load estimation methods  

DOE Green Energy (OSTI)

Ongoing research on quantifying the cooling loads in residential buildings, particularly buildings with passive solar heating systems, is described. Correlations are described that permit auxiliary cooling estimates from monthly average insolation and weather data. The objective of the research is to develop a simple analysis method, useful early in design, to estimate the annual cooling energy required of a given building.

McFarland, R.D.

1984-01-01T23:59:59.000Z

240

Estimating frequency of change  

Science Conference Proceedings (OSTI)

Many online data sources are updated autonomously and independently. In this article, we make the case for estimating the change frequency of data to improve Web crawlers, Web caches and to help data mining. We first identify various scenarios, where ... Keywords: Change frequency estimation, Poisson process

Junghoo Cho; Hector Garcia-Molina

2003-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Sandy River Delta Habitat Restoration : Annual Report, January 2008 - March 2009.  

DOE Green Energy (OSTI)

During the period 2008-2009, there were 2 contracts with BPA. One (38539) was dealing with the restoration work for 2007 and the other (26198) was an extension on the 2006 contract including the NEPA for Dam removal on the old channel of the Sandy River. For contract 38539, the Sandy River Delta Habitat Restoration project continued its focus on riparian hardwood reforestation with less emphasis on wetlands restoration. Emphasis was placed on Sundial Island again due to the potential removal of the dike and the loss of access in the near future. AshCreek Forest Management was able to leverage additional funding from grants to help finance the restoration effort; this required a mid year revision of work funded by BPA. The revised work not only continued the maintenance of restored hardwood forests, but was aimed to commence the restoration of the Columbia River Banks, an area all along the Columbia River. This would be the final restoration for Sundial Island. The grant funding would help achieve this. Thus by 2011, all major work will have been completed on Sundial Island and the need for access with vehicles would no longer be required. The restored forests continued to show excellent growth and development towards true riparian gallery forests. Final inter-planting was commenced, and will continue through 2010 before the area is considered fully restored. No new wetland work was completed. The wetlands were filled by pumping in early summer to augment the water levels but due to better rainfall, no new fuel was required to augment existing. Monitoring results continued to show very good growth of the trees and the restoration at large was performing beyond expectations. Weed problems continue to be the most difficult issue. The $100,000 from BPA planned for forest restoration in 2008, was augmented by $25,000 from USFS, $120,000 from OR150 grant, $18,000 from LCREP, and the COE continued to add $250,000 for their portion. Summary of the use of these funds are displayed in Table 1 (page 5). Work on the restoration of the original Sandy River channel (dam removal, contract 26198) continued slowly. The draft EA was completed and sent out for review. The COE has decided to finish the NEPA with the intent to complete the project.

Dobson, Robin [USDA Forest Service, Columbia River Gorge National Scenic Area

2009-09-11T23:59:59.000Z

242

Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.  

DOE Green Energy (OSTI)

This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

Bair, Brian; Olegario, Anthony; Powers, Paul

2002-06-01T23:59:59.000Z

243

Implementation plan: Executive summary. Environmental restoration and waste management programmatic environmental impact statement  

SciTech Connect

In November 1989, the Secretary of Energy established the U.S. Department of Energy Office of Environmental Restoration and Waste Management. This action consolidated the Department`s environmental restoration and waste management activities throughout the nation. In January 1990, the Secretary of Energy decided that the Department would prepare a Programmatic Environmental Impact Statement on the proposed integrated Environmental Restoration and Waste Management Program. The principal focus of the Programmatic Environmental Impact Statement process will be the evaluation of strategies for conducting remediation of Department sites and facilities to ensure the protection of human health and the environment; and the evaluation of potential configurations for waste management capabilities.

Not Available

1994-01-01T23:59:59.000Z

244

Final monitoring plan for site restoration at Murdock, Nebraska.  

SciTech Connect

In early 2005, Argonne National Laboratory conducted an Engineering Evaluation/Cost Analysis (EE/CA; Argonne 2005b) to address carbon tetrachloride contamination identified in groundwater and surface water at Murdock, Nebraska, approximately 22 mi east-northeast of Lincoln (Figure 1.1). The EE/CA study was performed for the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), as the technical basis for a proposed removal action for the Murdock site. The EE/CA was conducted in compliance with an Administrative Order on Consent issued for Murdock by the U.S. Environmental Protection Agency (EPA 1991). Three removal action alternatives were examined through the use of site-specific data and predictive simulations of groundwater flow and contaminant transport performed with calibrated numerical models. The alternatives were evaluated individually and compared against performance criteria established under the National Oil and Hazardous Substances Pollution Contingency Plan and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). On the basis of these evaluations, an alternative employing phytoremediation in conjunction with seasonal groundwater extraction and treatment by spray irrigation was recommended by the CCC/USDA to permanently reduce the carbon tetrachloride contaminant levels in groundwater and surface water at the site. The proposed alternative is being implemented in cooperation with the EPA. Under the direction of the CCC/USDA and the EPA, implementation of the chosen removal action occurred in phases, beginning in April 2005. Installation of all the required remediation systems was completed by the end of August 2005. Specific technical objectives of the removal action are as follows: (1) To eliminate pathways for potential human exposure to carbon tetrachloride concentrations above the regulatory limit of 44.2 {micro}g/L in surface water at the site. (2) To minimize or eliminate any detrimental environmental impacts of carbon tetrachloride discharge to the surface waters of a tributary creek located immediately north of the town. (3) To permanently reduce carbon tetrachloride concentrations in the groundwater and surface water at Murdock and hence restore these resources for potential beneficial use. To evaluate the effectiveness of the selected remedy and its ability to achieve the objectives specified for this site, monitoring is required. This document outlines the proposed scope of a long-term program for monitoring of the removal action at Murdock. In this section the specific remedial objectives of the action are summarized, and a brief overview of the chosen remedy is provided. Section 2 summarizes the results of a baseline sampling event that documented the distribution of carbon tetrachloride contamination in selected media at the Murdock site immediately before cleanup activities began. Section 3 recommends a strategy for subsequent monitoring of the removal action at Murdock, as well as criteria for evaluating the performance of the remedial systems and the progress of the restoration effort.

LaFreniere, L. M.; Environmental Science Division

2006-02-28T23:59:59.000Z

245

Value engineering as applied at the Savannah River Site for environmental restoration projects  

SciTech Connect

Value Engineering (VE) has been defined as the organized study of functions which satisfy the user`s needs at the lowest life cycle costs through applied creativity. VE was established in the World War II era when Mr. Lawrence Miles formed the concept of intentionally substituting materials to perform the function of more expensive standard materials. Since that time, VE has spread throughout the Department of Defense procurement agencies, and has in recent times been applied to almost every government agency. DOE Order 4040.1 states the policy to establish VE programs and use VE, where appropriate, to reduce nonessential costs and improve productivity for Departmental Elements. The order states that these VE programs shall, at a minimum, provide for the management and procurement practices as required by the OMB Circular A-131. Westinghouse Savannah River Company (WSRC), as the prime DOE contractor at the Savannah River Site (SRS), has adopted a policy of applying Value Engineering to all major projects with a Total Estimated Cost (TEC) of $10 million or greater. Projects of a lesser TEC may also have VE studies performed if management has determined that a significant potential exists for cost savings and/or cost avoidance. Within the Environmental Restoration (ER) Department, many of the groundwater remediation and waste site closure project represent individual projects that make up an overall SRS requirement to meet Federal RCRA or CERCLA clean up requirements. Many of these individual projects are not initially considered for VE studies because they never reach the $10 million TEC level. Because many remediation projects are duplicated throughout the site, there is a large potential for cross-link savings throughout the site.

Kupar, J.J.; Morgenstern, M.R.; Richardson, J.E.

1991-12-31T23:59:59.000Z

246

Value engineering as applied at the Savannah River Site for environmental restoration projects  

Science Conference Proceedings (OSTI)

Value Engineering (VE) has been defined as the organized study of functions which satisfy the user's needs at the lowest life cycle costs through applied creativity. VE was established in the World War II era when Mr. Lawrence Miles formed the concept of intentionally substituting materials to perform the function of more expensive standard materials. Since that time, VE has spread throughout the Department of Defense procurement agencies, and has in recent times been applied to almost every government agency. DOE Order 4040.1 states the policy to establish VE programs and use VE, where appropriate, to reduce nonessential costs and improve productivity for Departmental Elements. The order states that these VE programs shall, at a minimum, provide for the management and procurement practices as required by the OMB Circular A-131. Westinghouse Savannah River Company (WSRC), as the prime DOE contractor at the Savannah River Site (SRS), has adopted a policy of applying Value Engineering to all major projects with a Total Estimated Cost (TEC) of $10 million or greater. Projects of a lesser TEC may also have VE studies performed if management has determined that a significant potential exists for cost savings and/or cost avoidance. Within the Environmental Restoration (ER) Department, many of the groundwater remediation and waste site closure project represent individual projects that make up an overall SRS requirement to meet Federal RCRA or CERCLA clean up requirements. Many of these individual projects are not initially considered for VE studies because they never reach the $10 million TEC level. Because many remediation projects are duplicated throughout the site, there is a large potential for cross-link savings throughout the site.

Kupar, J.J.; Morgenstern, M.R.; Richardson, J.E.

1991-01-01T23:59:59.000Z

247

Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediate and Restore Former Waste Sites, Help Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint The Hanford Site is looking greener these days after American Recovery and Reinvestment Act workers revegetated 166 acres across 12 waste sites, planting over 1,100 pounds of seeds and about 280,000 pounds of mulch. The largest of the sites, known as the BC Control Area, is an approximately 13-square-mile area associated with a waste disposal system used during Hanford operations. Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint More Documents & Publications 2011 ARRA Newsletters Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of

248

DOE Transfers $5 million to NREL, Jobs to be Restored | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transfers $5 million to NREL, Jobs to be Restored Transfers $5 million to NREL, Jobs to be Restored DOE Transfers $5 million to NREL, Jobs to be Restored February 20, 2006 - 12:06pm Addthis WASHINGTON, DC - At the direction of Energy Secretary Samuel W. Bodman, $5 million was transferred to Midwest Research Institute, the operating contractor for the Department of Energy's (DOE) National Renewable Energy Laboratory (NREL), over the weekend. DOE has been informed that the NREL lab director will use these funds to immediately restore all of the jobs that were cut earlier this month due to budget shortfalls. "The programs at NREL are critically important to realizing the President's vision to diversify and strengthen our nation's energy mix," Secretary Bodman said. "The action we are taking today will allow the dedicated

249

Self-Healing of Structural Damage to Restore Performance of Electrical  

Office of Science (SC) Website

Self-Healing of Structural Damage to Self-Healing of Structural Damage to Restore Performance of Electrical Circuits Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Science Highlights Highlight Archives News & Events Publications Contact BES Home 04.27.12 Self-Healing of Structural Damage to Restore Performance of Electrical Circuits Print Text Size: A A A RSS Feeds FeedbackShare Page Scientific Achievement Designed chemical interactions of liquid-metal-filled microcapsules target areas of microstructural damage and restore conductive pathways. Significance and Impact Selective self-healing mechanism extends the lifetime and reliability of electronic devices including battery electrodes. Research Details Liquid Indium-Gallium metal-filled microcapsules restore nearly 99% of the

250

Ventricular structures must be understood during surgical restoration for heart failure  

E-Print Network (OSTI)

surgical restoration for heart failure Fig. 9. The normalleft ventricle. Am J Physiol Heart Circ Physiol 2001;280(2):and function of the helical heart and its buttress wrapping.

Buckberg, G D

2007-01-01T23:59:59.000Z

251

Analysis and restoration of a 1960s ear vacuum tube AM-FM reflex receiver  

E-Print Network (OSTI)

This thesis details the analysis, restoration, and evaluation of a 1960s era vacuum tube AM-FM reflex receiver. External influences such as tax laws necessitated clever designs to minimize the use of expensive vacuum tubes ...

Golden, Adam J

2004-01-01T23:59:59.000Z

252

United States of America, Department of Energy Environmental Restoration and Waste Management Advisory Committee Public Meeting  

SciTech Connect

This report is a transcript of the public hearing of the US DOE Environmental Restoration and Waste Management Advisory Committee held in Golden, Colorado June 16--18, 1993.

1993-07-01T23:59:59.000Z

253

On the Use of the Force–Restore SVAT Model Formulation for Stratified Soils  

Science Conference Proceedings (OSTI)

An approach to simulate soil moisture content with the force–restore soil–vegetation–atmosphere transfer (SVAT) model in the case of stratified soils is proposed. Typical soil profiles possess marked variation in soil hydraulic properties from ...

Nicola Montaldo; John D. Albertson

2001-12-01T23:59:59.000Z

254

EA-1932: Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EA was initiated to evaluate the potential environmental impacts of a BPA proposal to fund Montana Fish, Wildlife and Parks to help restore native fish populations to the Tobacco River and Lake Koocanusa. The project has been cancelled.

255

A Novel Dynamic Voltage Restorer with Outage Handling Capability Using Fuzzy Logic Controler  

Science Conference Proceedings (OSTI)

This paper presents a novel dynamic voltage restorer (DVR) capable of handling deep sags including outage on a low voltage distribution system. The DVR recovers sags up to 10% of nominal voltage; otherwise, it will operate as an uninterruptible power ...

M. Ashari; T. Hiyama; M. Pujiantara; H. Suryoatmojo; M. Hery Purnomo

2007-09-01T23:59:59.000Z

256

EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an environmental assessment to analyze the potential effects of a proposal to restore wetland and riparian (riverbank) habitat and to reduce erosion in the Clark Fork River delta located in Bonner County, Idaho.

257

Protect and Restore Mill Creek Watershed; Annual Report 2004-2005.  

DOE Green Energy (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. The Nez Perce Tribe and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership, more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Mill Creek watershed of the South Fork Clearwater River in 2000. Progress has been made in restoring the watershed through excluding cattle from critical riparian areas through fencing. Starting in FY 2002, continuing into 2004, trees were planted in riparian areas in the meadow of the upper watershed. In addition, a complete inventory of culverts at road-stream crossings was completed. Culverts have been prioritized for replacement to accommodate fish passage throughout the watershed, and one high priority culvert was replaced in 2004. Maintenance to the previously built fence was also completed.

McRoberts, Heidi (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2005-12-01T23:59:59.000Z

258

Protect and Restore Mill Creek Watershed; Annual Report 2003-2004.  

DOE Green Energy (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. The Nez Perce Tribe and the Nez Perce National Forest have formed a partnership in completing watershed restoration activities, and through this partnership, more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Mill Creek watershed of the South Fork Clearwater River in 2000. Progress has been made in restoring the watershed through excluding cattle from critical riparian areas through fencing. Starting in FY 2002, continuing into 2004, trees were planted in riparian areas in the meadow of the upper watershed. In addition, a complete inventory of culverts at road-stream crossings was completed. Culverts have been prioritized for replacement to accommodate fish passage throughout the watershed, and designs completed on two of the high priority culverts. Maintenance to the previously built fence was also completed.

McRoberts, Heidi (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2004-06-01T23:59:59.000Z

259

Protect and Restore Mill Creek Watershed; Annual Report 2002-2003.  

DOE Green Energy (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. Watershed restoration projects within the Mill Creek watershed are coordinated with the Nez Perce National Forest. The Nez Perce Tribe began watershed restoration projects within the Mill Creek watershed of the South Fork Clearwater River in 2000. Progress has been made in restoring the watershed through excluding cattle from critical riparian areas through fencing. During the FY 2002, trees were planted in riparian areas in the meadow of the upper watershed. In addition, a complete inventory of culverts at road-stream crossings was completed. Culverts have been prioritized for replacement to accommodate fish passage throughout the watershed. Maintenance to the previously built fence was also completed.

McRoberts, Heidi (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2004-01-01T23:59:59.000Z

260

Response Requested via ISRP regarding Proposed Scope Expansion of the Project Restore Potlatch River Watershed (#200206100)  

E-Print Network (OSTI)

) Riparian plantings and/or channel restoration on pasture and rangelands (Objective B, page 23) Coordinate are driven primarily by air temperature, solar insolation, pool depth, and geographic aspect. Waters

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Quantifying And Managing The Influence Of Maintenance Actions On The Survivability Of Mesh-Restorable Networks  

E-Print Network (OSTI)

of "roll to protection" in rings. The basic methods can be adapted for other maintenance models or models of the restoration process or adapted to handle multiple maintenance scenarios. The work is aimed at understanding and managing the effects of maintenance in a mesh-restorable network and ultimately providing new operational and design capabilities for future mesh-based network planning and operations systems. I. Motivation and Background One of the motivations for mesh-restorable networking is the greater capacity efficiency of mesh networks relative to ring-based transport networks. The capacity efficiency comes from the more direct routing of working paths, the need for less spare capacity for restoration, and the avoidance of "stranded capacity" effects in rings where one or more ring spans may exhaust while other spans of the ring have valuable but unusable remaining working capacity. Of course capacity efficiency is not the only consideration in a choice of n

Wayne D. Grover; Matthieu Clouqueur; Thuthuy Bach

2001-01-01T23:59:59.000Z

262

State Emissions Estimates  

Gasoline and Diesel Fuel Update (EIA)

Estimates of state energy-related carbon dioxide emissions Estimates of state energy-related carbon dioxide emissions Because energy-related carbon dioxide (CO 2 ) constitutes over 80 percent of total emissions, the state energy-related CO 2 emission levels provide a good indicator of the relative contribution of individual states to total greenhouse gas emissions. The U.S. Energy Information Administration (EIA) emissions estimates at the state level for energy-related CO 2 are based on data contained in the State Energy Data System (SEDS). 1 The state-level emissions estimates are based on energy consumption data for the following fuel categories: three categories of coal (residential/commercial, industrial, and electric power sector); natural gas; and ten petroleum products including-- asphalt and road oil, aviation gasoline, distillate fuel, jet fuel, kerosene, liquefied petroleum gases

263

Faster Phase Estimation  

E-Print Network (OSTI)

We develop several algorithms for performing quantum phase estimation based on basic measurements and classical post-processing. We present a pedagogical review of quantum phase estimation and simulate the algorithm to numerically determine its scaling in circuit depth and width. We show that the use of purely random measurements requires a number of measurements that is optimal up to constant factors, albeit at the cost of exponential classical post-processing; the method can also be used to improve classical signal processing. We then develop a quantum algorithm for phase estimation that yields an asymptotic improvement in runtime, coming within a factor of log* of the minimum number of measurements required while still requiring only minimal classical post-processing. The corresponding quantum circuit requires asymptotically lower depth and width (number of qubits) than quantum phase estimation.

Krysta M. Svore; Matthew B. Hastings; Michael Freedman

2013-04-02T23:59:59.000Z

264

Radiation Stress Estimators  

Science Conference Proceedings (OSTI)

The radiation stresses Sij associated with the propagation of wind-generated waves are principal driving forces for several important surf-zone processes. The accurate estimation of the onshore flux of longshore-directed mean momentum Syx, using ...

S. S. Pawka; D. L. Inman; R. T. Guza

1983-09-01T23:59:59.000Z

265

On the breaking and restoration of symmetries within the nuclear energy density functional formalism  

E-Print Network (OSTI)

We review the notion of symmetry breaking and restoration within the frame of nuclear energy density functional methods. We focus on key differences between wave-function- and energy-functional-based methods. In particular, we point to difficulties encountered within the energy functional framework and discuss new potential constraints on the underlying energy density functional that could make the restoration of broken symmetries better formulated within such a formalism. We refer to Ref.~\\cite{duguet10a} for details.

T. Duguet; J. Sadoudi

2010-10-19T23:59:59.000Z

266

Development of field guidance for assessing feasibility of intrinsic bioremediation to restore petroleum-contaminated soils. Master's thesis  

Science Conference Proceedings (OSTI)

This research evaluated the process of intrinsic bioremediation, also called natural attenuation, and the parameters that affected it. The goal of this study was to use these intrinsic bioremediation parameters to develop a valid prediction of the cleanup duration using this restoration technology. This analysis was limited to a JP-4 release and focused on the remediation of the BTEX constituents to a cleanup level of 10 ppm total BTEX. The review of intrinsic bioremediation found that the BTEX hydrocarbons can aerobically and anaerobically biodegrade. Of the many factors that affect intrinsic bioremediation, those that most influenced its occurrence were the quantities of aerobic and anaerobic electron acceptors used in biodegradation. The electron acceptors considered in this research were oxygen, nitrate, manganese (IV), iron (III), and sulfate. A no-dispersion biodegradation model was developed to determine the prediction of the intrinsic bioremediation duration based on the concentrations of individual electron acceptors. Only the aerobic electron acceptor had a measurable influence on the biodegradation model; hence, the prediction results focused on the aerobic biodegradation and its boundary with the anaerobic portion. The key factors used to characterize this boundary and its movement was the initial quantities of BTEX, dissolved oxygen and the relative velocity of the ground water moving through the retarded plume. A linear regression was performed to relate the three parameters mentioned above to the motion of the aerobic boundary.

Enyeart, J.T.

1994-09-01T23:59:59.000Z

267

Parity restoration in the Highly Truncated Diagonalization Approach: application to the outer fission barrier of $^{240}$Pu  

E-Print Network (OSTI)

The restoration of the parity symmetry has been performed in the framework of the Highly Truncated Diagonalization Approach suited to treat correlations in an explicitly particle-number conserving microscopic approach. To do so we have assumed axial symmetry and used a generalized Wick's theorem due to L\\"owdin in a projection-after-variation scheme. We have chosen the Skyrme SkM$^*$ energy-density functional for the particle-hole channel and a density-independent delta force for the residual interaction. We have applied this approach in the region of the outer fission barrier of the $^{240}$Pu nucleus. As a result, we have shown that the $K^{\\pi} = 0^+$ fission isomeric state is statically unstable against intrinsic-parity breaking modes, while the projection does not affect the energy at the top of the intrinsic outer fission barrier. Altogether, this leads to an increase of the height of the outer fission barrier--with respect to the fission isomeric state--by about 350 keV, affecting thus significantly th...

Hao, T V Nhan; Bonneau, L

2012-01-01T23:59:59.000Z

268

Parity restoration in the Highly Truncated Diagonalization Approach: application to the outer fission barrier of $^{240}$Pu  

E-Print Network (OSTI)

The restoration of the parity symmetry has been performed in the framework of the Highly Truncated Diagonalization Approach suited to treat correlations in an explicitly particle-number conserving microscopic approach. To do so we have assumed axial symmetry and used a generalized Wick's theorem due to L\\"owdin in a projection-after-variation scheme. We have chosen the Skyrme SkM$^*$ energy-density functional for the particle-hole channel and a density-independent delta force for the residual interaction. We have applied this approach in the region of the outer fission barrier of the $^{240}$Pu nucleus. As a result, we have shown that the $K^{\\pi} = 0^+$ fission isomeric state is statically unstable against intrinsic-parity breaking modes, while the projection does not affect the energy at the top of the intrinsic outer fission barrier. Altogether, this leads to an increase of the height of the outer fission barrier--with respect to the fission isomeric state--by about 350 keV, affecting thus significantly the fission-decay lifetime of the considered fission isomer.

T. V. Nhan Hao; P. Quentin; L. Bonneau

2012-10-01T23:59:59.000Z

269

Protect and Restore Red River Watershed, 2007-2008 Annual Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. The Nez Perce Tribe (NPT) and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Red River Watershed of the South Fork Clearwater River in 2001. Progress has been made in restoring the watershed through road decommissioning and culvert replacement. From completing a watershed assessment to two NEPA efforts and a final stream restoration design, we will begin the effort of restoring the mainstem channel of Red River to provide spawning and rearing habitat for anadromous and resident fish species. Roads have been surveyed and prioritized for removal or improvement as well as culverts being prioritized for replacement to accommodate fish passage throughout the watershed. Another major, and extremely, important component of this project is the Red River Meadow Conservation Easement. We have begun the process of pursuing a conservation easement on approximately 270 acres of prime meadow habitat (Red River runs through this meadow and is prime spawning and rearing habitat).

Bransford, Stephanie [Nez Perce Tribe Fisheries/Watershed Program

2009-05-04T23:59:59.000Z

270

Restoring Sustainable Forests on Appalachian Mined Lands for Wood Products, Renewable Energy, Carbon Sequestration, and Other Ecosystem Services  

DOE Green Energy (OSTI)

The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. We are currently estimating the acreage of lands in Virginia, West Virginia, Kentucky, Ohio, and Pennsylvania mined under SMCRA and reclaimed to non-forested post-mining land uses that are not currently under active management, and therefore can be considered as available for carbon sequestration. To determine actual sequestration under different forest management scenarios, a field study was installed as a 3 x 3 factorial in a random complete block design with three replications at each of three locations, one each in Ohio, West Virginia, and Virginia. The treatments included three forest types (white pine, hybrid poplar, mixed hardwood) and three silvicultural regimes (competition control, competition control plus tillage, competition control plus tillage plus fertilization). Each individual treatment plot is 0.5 acres. Each block of nine plots is 4.5 acres, and the complete installation at each site is 13.5 acres. Regression models of chemical and physical soil properties were created in order to estimate the SOC content down the soil profile. Soil organic carbon concentration and volumetric percent of the fines decreased exponentially down the soil profile. The results indicated that one-third of the total SOC content on mined lands was found in the surface 0-13 cm soil layer, and more than two-thirds of it was located in the 0-53 cm soil profile. A relative estimate of soil density may be best in broad-scale mine soil mapping since actual D{sub b} values are often inaccurate and difficult to obtain in rocky mine soils. Carbon sequestration potential is also a function of silvicultural practices used for reforestation success. Weed control plus tillage may be the optimum treatment for hardwoods and white pine, as any increased growth resulting from fertilization may not offset the decreased survival that accompanied fertilization. Relative to carbon value, our analysis this quarter shows that although short-rotation hardwood management on reclaimed surface mined lands may have higher LEVs than traditional long-rotation hardwood management, it is only profitable in a limited set of circumstances.

James A. Burger; J. Galbraith; T. Fox; G. Amacher; J. Sullivan; C. Zipper

2005-12-01T23:59:59.000Z

271

John Day Watershed Restoration Projects, annual report 2003.  

DOE Green Energy (OSTI)

The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.

Brown, Linda (Confederated Tribes of the Warm Springs Reservation of Oregon, John Day Basin Office, John Day, OR)

2004-01-01T23:59:59.000Z

272

RESTORING SUSTAINABLE FORESTS ON APPALACHIAN MINED LANDS FOR WOOD PRODUCTS, RENEWABLE ENERGY, CARBON SEQUESTRATION, AND OTHER ECOSYSTEM SERVICES  

DOE Green Energy (OSTI)

The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. In this segment of work, our goal was to review methods for estimating tree survival, growth, yield and value of forests growing on surface mined land in the eastern coalfields of the USA, and to determine the extent to which carbon sequestration is influenced by these factors. Public Law 95-87, the Surface Mining Control and Reclamation Act of 1977 (SMCRA), mandates that mined land be reclaimed in a fashion that renders the land at least as productive after mining as it was before mining. In the central Appalachian region, where prime farmland and economic development opportunities for mined land are scarce, the most practical land use choices are hayland/pasture, wildlife habitat, or forest land. Since 1977, the majority of mined land has been reclaimed as hayland/pasture or wildlife habitat, which is less expensive to reclaim than forest land, since there are no tree planting costs. As a result, there are now hundreds of thousands of hectares of grasslands and scrublands in various stages of natural succession located throughout otherwise forested mountains in the U.S. A literature review was done to develop the basis for an economic feasibility study of a range of land-use conversion scenarios. Procedures were developed for both mixed hardwoods and white pine under a set of low product prices and under a set of high product prices. Economic feasibility is based on land expectation values. Further, our review shows that three types of incentive schemes might be important: (1) lump sum payment at planting (and equivalent series of annual payments); (2) revenue incentive at harvest; and (3) benefit based on carbon volume.

Jonathan Aggett

2003-12-15T23:59:59.000Z

273

Restoring Sustainable Forests on Appalachian Mined Lands for Wood Products, Renewable Energy, Carbon Sequestration, and Other Ecosystems Services  

DOE Green Energy (OSTI)

The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. During this quarter we worked on methodologies for analyzing carbon in mine soils. A unique property of mine soils is the presence of coal and carboniferous rock particles that are present in mine soils in various sizes, quantities, and qualities. There is no existing method in the literature that may be of use for quantitative estimation of soil organic carbon (SOC) in mine soils that can successfully differentiate between pedogenic and geogenic carbon forms. In this report we present a detailed description of a 16-step method for measuring SOC in mine soils designed for and tested on a total of 30 different mine soil mixtures representing a wide spectrum of mine soils in the hard-rock region of the Appalachian coalfield. The proposed method is a combination of chemical procedure for carbonates removal, a thermal procedure for pedogenic C removal, and elemental C analysis procedure at 900 C. Our methodology provides a means to correct for the carbon loss from the more volatile constituents of coal fragments in the mine soil samples and another correction factor for the protected organic matter that can also remain unoxidized following thermal pretreatment. The correction factors for coal and soil material-specific SOM were based on carbon content loss from coal and SOM determined by a parallel thermal oxidation analysis of pure ground coal fragments retrieved from the same mined site as the soil samples and of coal-free soil rock fragments of sandstone and siltstone origin.

James A. Burger; J. Galbraith; T. Fox; G. Amacher; J. Sullivan; C. Zipper

2006-04-30T23:59:59.000Z

274

RESTORING SUSTAINABLE FORESTS ON APPALACHIAN MINED LANDS FOR WOOD PRODUCTS, RENEWABLE ENERGY, CARBON SEQUESTRATION, AND OTHER ECOSYSTEM SERVICES  

DOE Green Energy (OSTI)

The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. We are currently estimating the acreage of lands in VA, WV, KY, OH, and PA mined under SMCRA and reclaimed to non-forested post-mining land uses that are not currently under active management, and therefore can be considered as available for carbon sequestration. To determine actual sequestration under different forest management scenarios, a field study was installed as a 3 x 3 factorial in a random complete block design with three replications at each of three locations, Ohio, West Virginia, and Virginia. The treatments included three forest types (white pine, hybrid poplar, mixed hardwood) and three silvicultural regimes (competition control, competition control plus tillage, competition control plus tillage plus fertilization). Each individual treatment plot is 0.5 acres. Each block of nine plots requires 4.5 acres, and the complete installation at each site requires 13.5 acres. The plots at all three locations have been installed and the plot corners marked with PVC stakes. GPS coordinates of each plot have been collected. Soil samples were collected from each plot to characterize the sites prior to treatment. Baseline soil carbon was determined for each of the eighty-one plots. Fertility analysis of soil samples was completed and these data were used to prepare fertilizer prescriptions and the pre-designated plots were fertilized. We also evaluated economic-based policy instruments that are designed to mitigate the reforestation burden borne by the owner of reclaimed mined land. Results suggest that although profitability of reforestation of these previously reclaimed mine lands may be achievable on better sites under lower interest rates, substantial payments would be required to reach ''profitability'' under many conditions.

J. Burger; J. Galbraith; T. Fox; G. Amacher; J. Sullivan; C. Zipper

2004-08-04T23:59:59.000Z

275

Experimental factors affecting PCR-based estimates of microbial species richness and evenness  

E-Print Network (OSTI)

template mismatch by real-time PCR using the 16S rRNA geneWelch DB (2009). Effect of PCR amplicon size on assessmentsof mixtures of 16S rRNA genes by PCR. Appl Environ Microbiol

Engelbrektson, Anna

2010-01-01T23:59:59.000Z

276

Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004  

SciTech Connect

The restoration of wetland salmon habitat in the tidal portion of the Columbia River is occurring at an accelerating pace and is anticipated to improve habitat quality and effect hydrological reconnection between existing and restored habitats. Currently multiple groups are applying a variety of restoration strategies in an attempt to emulate historic estuarine processes. However, the region lacks both a standardized means of evaluating the effectiveness of individual projects as well as methods for determining the cumulative effects of all restoration projects on a regional scale. This project is working to establish a framework to evaluate individual and cumulative ecosystem responses to restoration activities in order to validate the effectiveness of habitat restoration activities designed to benefit salmon through improvements to habitat quality and habitat opportunity (i.e. access) in the Columbia River from Bonneville Dam to the ocean. The review and synthesis of approaches to measure the cumulative effects of multiple restoration projects focused on defining methods and metrics of relevance to the CRE, and, in particular, juvenile salmon use of this system. An extensive literature review found no previous study assessing the cumulative effects of multiple restoration projects on the fundamental processes and functions of a large estuarine system, although studies are underway in other large land-margin ecosystems including the Florida Everglades and the Louisiana coastal wetlands. Literature from a variety of scientific disciplines was consulted to identify the ways that effects can accumulate (e.g., delayed effects, cross-boundary effects, compounding effects, indirect effects, triggers and thresholds) as well as standard and innovative tools and methods utilized in cumulative effects analyses: conceptual models, matrices, checklists, modeling, trends analysis, geographic information systems, carrying capacity analysis, and ecosystem analysis. Potential indicators for detecting a signal in the estuarine system resulting from the multiple projects were also reviewed, i.e. organic matter production, nutrient cycling, sedimentation, food webs, biodiversity, salmon habitat usage, habitat opportunity, and allometry. In subsequent work, this information will be used to calculate the over net effect on the ecosystem. To evaluate the effectiveness of habitat restoration actions in the lower Columbia River and estuary, a priority of this study has been to develop a set of minimum ecosystem monitoring protocols based on metrics important for the CRE. The metrics include a suite of physical measurements designed to evaluate changes in hydrological and topographic features, as well as biological metrics that will quantify vegetation and fish community structure. These basic measurements, intended to be conducted at all restoration sites in the CRE, will be used to (1) evaluate the effectiveness of various restoration procedures on target metrics, and (2) provide the data to determine the cumulative effects of many restoration projects on the overall system. A protocol manual is being developed for managers, professional researchers, and informed volunteers, and is intended to be a practical technical guide for the design and implementation of monitoring for the effects of restoration activities. The guidelines are intended to standardize the collection of data critical for analyzing the anticipated ecological change resulting from restoration treatments. Field studies in 2005 are planned to initiate the testing and evaluation of these monitoring metrics and protocols and initiate the evaluation of higher order metrics for cumulative effects.

Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

2005-12-15T23:59:59.000Z

277

REQUESTS FOR RETIREMENT ESTIMATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REQUEST FOR RETIREMENT ANNUITY ESTIMATE REQUEST FOR RETIREMENT ANNUITY ESTIMATE Instructions: Please read and answer the following questions thoroughly to include checking all applicable boxes. Unanswered questions may delay processing. Print and Fax back your request form to 202.586.6395 or drop request to GM-169. The request will be assigned to your servicing retirement specialist. They will confirm receipt of your request. SECTION A Request Submitted _____________________ ______________________ ________________________ _____________________ Name (last, first, middle) Last four SSN Date of Birth ___________________________ _________________________ __________________________ Organization Office Telephone Number Fax Number

278

Iterative phase estimation  

E-Print Network (OSTI)

We give an iterative algorithm for phase estimation of a parameter theta, which is within a logarithmic factor of the Heisenberg limit. Unlike other methods, we do not need any entanglement or an extra rotation gate which can perform arbitrary rotations with almost perfect accuracy: only a single copy of the unitary channel and basic measurements are needed. Simulations show that the algorithm is successful. We also look at iterative phase estimation when depolarizing noise is present. It is seen that the algorithm is still successful provided the number of iterative stages is below a certain threshold.

Caleb J O'Loan

2009-04-22T23:59:59.000Z

279

ANL technical support program for DOE Environmental Restoration and Waste Management. Annual report, October 1991--September 1992  

Science Conference Proceedings (OSTI)

A program was established for DOE Environmental Restoration and Waste Management (EM) to evaluate factors that are anticipated to affect waste glass reaction during repository disposal, especially in an unsaturated environment typical of what may be expected for the proposed Yucca Mountain repository site. This report covers progress in FY 1992 on the following tasks: 1. A compendium of the characteristics of high-level nuclear waste borosilicate glass has been written. 2. A critical review of important parameters that affect the reactivity of glass in an unsaturated environment is being prepared. 3. A series of tests has been started to evaluate the reactivity of fully radioactive glasses in a high-level waste repository environment and compare it to the reactivity of synthetic, nonradioactive glasses of similar composition. 4. The effect of radiation upon the durability of waste glasses at a high glass surface area-to-liquid volume (SA/V) ratio and a high gas-to-liquid volume ratio will be assessed. These tests address both vapor and high SA/V liquid conditions. 5. A series of tests is being performed to compare the extent of reaction of nuclear waste glasses at various SAN ratios. Such differences in the SAN ratio may significantly affect glass durability. 6. A series of natural analogue tests is being analyzed to demonstrate a meaningful relationship between experimental and natural alteration conditions. 7. Analytical electron microscopy (AEM), infrared spectroscopys and nuclear resonant profiling are being used to assess the glass/water reaction pathway by identifying intermediate phases that appear on the reacting glass. Additionally, colloids from the leach solutions are being studied using AEM. 8. A technical review of AEM results is being provided. 9. A study of water diffusion involving nuclear waste glasses is being performed. 10. A mechanistically based model is being developed to predict the performance of glass over repository-relevant time periods.

Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J. [Argonne National Lab., IL (United States); Bourcier, W.L.; Morgan, L.E.; Newton, L.; Nielsen, J.K.; Phillips, B.L. [Lawrence Livermore National Lab., CA (United States); Ewing, R.C.; Wang, L. [Univ. of New Mexico, Albuquerque, NM (United States); Li, H.; Tomozawa, M. [Rensselaer Polytechnic Inst., Troy, NY (United States)

1993-05-01T23:59:59.000Z

280

Estimation of Rainfall for Flood Prediction from WSR-88D Reflectivity: A Case Study, 17–18 October 1994  

Science Conference Proceedings (OSTI)

Flood forecasting requires accurate estimates of the spatial and temporal rainfall rates over a catchment. Depending on the Z–R relationship and threshold values, processing of WSR-88D reflectivity data affects the rainfall estimates used in ...

Baxter E. Vieux; Philip B. Bedient

1998-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

External Dose Estimates from  

E-Print Network (OSTI)

Appendix E External Dose Estimates from NTS Fallout E-1 #12;External Radiation Exposure as the dependence on fallout time of arrival. The most exposed individuals were outdoor workers; the least exposed was about a factor of 20 less than that from "global fallout" from high- yield weapons tests carried out

282

External Dose Estimates from  

E-Print Network (OSTI)

Appendix G External Dose Estimates from Global Fallout G-1 #12;External Radiation Exposure from the fallout from all of these tests was about 0.7 mSv, about equivalent to 2-3 years of external radiation exposure from natural background. In contrast to the fallout from tests at the Nevada Test site

283

EPA Revises Emissions Estimation Methodology  

U.S. Energy Information Administration (EIA)

The changes to the historical emission estimates are the result of revisions to the data and estimation ... b K.D . Smythe, RAND ... RAND Environmental Science and ...

284

Evaluation of Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2010  

Science Conference Proceedings (OSTI)

This is the seventh and final annual report of a project (2004–2010) addressing evaluation of the cumulative effects of habitat restoration actions in the 235-km-long lower Columbia River and estuary. The project, called the Cumulative Effects (CE) study, was conducted for the U.S. Army Corps of Engineers Portland District by a collaboration of research agencies led by the Pacific Northwest National Laboratory. We achieved the primary goal of the CE study to develop a methodology to evaluate the cumulative effects of habitat actions in the Columbia Estuary Ecosystem Restoration Program. We delivered 1) standard monitoring protocols and methods to prioritize monitoring activities; 2) the theoretical and empirical basis for a CE methodology using levels-of-evidence; 3) evaluations of cumulative effects using ecological relationships, geo-referenced data, hydrodynamic modeling, and meta-analyses; and 4) an adaptive management process to coordinate and coalesce restoration efforts in the LCRE. A solid foundation has been laid for future comprehensive evaluations of progress made by the Columbia Estuary Ecosystem Restoration Program to understand, conserve, and restore ecosystems in the lower Columbia River and estuary.

Johnson, Gary E.; Diefenderfer, Heida L.; Thom, Ronald M.; Roegner, G. Curtis; Ebberts, Blaine D.; Skalski, John R.; Borde, Amy B.; Dawley, Earl; Coleman, Andre M.; Woodruff, Dana L.; Breithaupt, Stephen A.; Cameron, April; Corbett, C.; Donley, Erin E.; Jay, D. A.; Ke, Yinghai; Leffler, K.; McNeil, C.; Studebaker, Cindy; Tagestad, Jerry D.

2012-05-01T23:59:59.000Z

285

Restoring Sustainable Forests on Appalachian Mined Lands for Wood Products, Renewable Energy, Carbon Sequestration, and Other Ecosystem Services  

DOE Green Energy (OSTI)

The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. In this quarterly report we present data that show the spatial distribution of carbon in mine soils. Soil carbon data from deep soil pits from grassland minelands located in Ohio, Virginia, and West Virginia were analyzed to determine the vertical distribution and variability of soil organic carbon (SOC) down to a 2-m depth. Regression analyses were used to describe and model the distribution by soil depth of C(wt%), BD{sub fines}(g cm{sup -3}), and fines (vol%) in mine soils. The volume of excavated mine soil samples was transformed in terms of costs of digging and sampling, including sample collection and preparation, and C(wt%) analysis, in order to determine the maximum cost-effective depth (MCD) for carbon inventorying on the mined sites analyzed. Based on the horizontal variation of SOC(g m{sup -2}), we determined the sampling intensity required to achieve a desired accuracy of the amount of sequestered SOC(g m{sup -2}) at certain probability levels. The MCD and sampling intensity measurements were used to determine the minimum detectable difference (MDD) of SOC(g m{sup -2}) between two consecutive carbon inventories. We also proposed a method to determine the minimum number of years before a future C inventory event is carried out so that the measured SOC(g m{sup -2}) differences were greater than MDD. We used geostatistical analyses procedures to determine spatial dependence predictability of surface SOC(g m{sup -2}) data on the minelands analyzed. Kriging techniques were used to create surface SOC(g m{sup -2}) maps for the sites in Ohio and West Virginia. The average C sequestration rate in the surface soil layer for the Ohio (age 9) sites was estimated at 124 g C m{sup -2} yr{sup -1}, and it was estimated at 107 g C m{sup -2} yr{sup -1} for the West Virginia sites (age 4). Because of the young age of the Virginia sites, 0.2 and 1 year old, we came to a decision that C sequestration rates would be inappropriate at this stage of their development, as these soils are expected to change with time.

James A. Burger; J. Galbraith; T. Fox; G. Amacher; J. Sullivan; C. Zipper

2006-05-05T23:59:59.000Z

286

The influence of affect on attitude  

E-Print Network (OSTI)

11 The Influence of Affect on Attitude Gerald L. Clore Simone Schnall University of Virginia AFFECTIVE INFLUENCE ON ATTITUDE Priests of the medieval Catholic Church understood something about the relationship between affect and attitude... another, earlier review (Boakes, 1989, p. 389), which stated that "[Brewer's] conclusion still stands that there is no convincing evidence for conditioning in human subjects without awareness of the contingencies." The gist of the argument made...

Clore, Gerald L.; Schnall, Simone

2005-01-01T23:59:59.000Z

287

DOE Beryllium Affected Workers Web Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Training What's New? Workshops Health and Safety HSS Logo DOE Beryllium Affected Workers Web Resources 1. What Is Beryllium? Beryllium is a hard, lightweight metal that is very...

288

NPP Estimation for Grasslands  

NLE Websites -- All DOE Office Websites (Extended Search)

NPP for Grasslands NPP for Grasslands Introduction The Oak Ridge DAAC Net Primary Production (NPP) Database includes field measurements from grassland study sites worldwide. The following brief review and discussion is intended to explain the complexity of NPP estimates derived from grassland measurements. There is no single answer to the question, "What is the productivity of the ecosystem at study site A?"; rather there may be range of estimates of NPP, depending upon what data were actually collected and how these data are processed. Although some of these methods for determining NPP for grasslands may be applicable to other vegetation types (e.g., semi-deserts, tundra, or some crops), methods for forests, in particular, are significantly different. Nevertheless, it should be possible to answer the question, "Is this modelled value of NPP reasonable for this ecosystem type at this location?"

289

Hurricane Season: Restoring Power after a Big Storm | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hurricane Season: Restoring Power after a Big Storm Hurricane Season: Restoring Power after a Big Storm Hurricane Season: Restoring Power after a Big Storm June 5, 2012 - 4:01pm Addthis Hurricane Irene made landfall on the coast of North Carolina as a Category 1 hurricane during the 2011 Atlantic hurricane season. It was the ninth named storm, first hurricane, and first major hurricane of the 2011 hurricane season. | Photo courtesy of the National Oceanic and Atmospheric Administration. Hurricane Irene made landfall on the coast of North Carolina as a Category 1 hurricane during the 2011 Atlantic hurricane season. It was the ninth named storm, first hurricane, and first major hurricane of the 2011 hurricane season. | Photo courtesy of the National Oceanic and Atmospheric Administration. William Bryan William Bryan

290

Restoration of Refinery Heaters Using the Technique of Prefabricated Ceramic Fiber Lined Panels  

E-Print Network (OSTI)

Refinery heater fuel requirements often represent 50% of a units operating cost. A one percent change in the efficiency of a heater firing 100 MBtu/hr amounts to more than $25,000 per year. Heater efficiency is influenced by casing hot spots, air leakage, corbel damage, flue gas obstruction and dirty tubes. Efficiency impact is greatest in the convection section since conventional repairs only permit accessing from the outside, thus only hot spots and some air leakage are repaired. Exxon USA's Baton Rouge refinery has adopted a restoration procedure, using the technique of ceramic fiber lined panels, which corrects all the problem areas and returns the heater to new condition. Restorations have been successfully completed on convection sections as well as total heaters. All restorations have been within a normal turnaround period. Efficiency increases greater than 3% have been realized, as well as improvements in the heater's operation.

Sento, H. D.

1981-01-01T23:59:59.000Z

291

Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007  

Science Conference Proceedings (OSTI)

The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

2008-10-01T23:59:59.000Z

292

Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992  

SciTech Connect

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

1991-08-01T23:59:59.000Z

293

Operated device estimation framework  

E-Print Network (OSTI)

Protective device estimation is a challenging task because there are numerous protective devices present in a typical distribution system. Among various protective devices, auto-reclosers and fuses are the main overcurrent protection on distribution systems. Operation of a protective device in response to a particular fault condition depends upon the protective device’s operating behavior and coordination of various such protective devices. This thesis presents the design and implementation of a protective device estimation algorithm which helps in identifying which protective devices have operated to clear a short circuit condition. The algorithm uses manufacturer’s device details, power quality data measured from substation monitoring devices and power system event features estimated using existing DFA algorithms. The proposed technique can be used to evaluate coordination of these protective devices and helps in locating a fault in a distribution system feeder. This approach is independent of feeder topology and could be readily used for any distribution system. The effectiveness of this algorithm is verified by simulated and actual test data. Suggestions are included for future research and application by electric utilities.

Rengarajan, Janarthanan

2008-12-01T23:59:59.000Z

294

Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory. Environmental Restoration Program  

SciTech Connect

A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D&D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities.

Clark, C. Jr.

1993-07-01T23:59:59.000Z

295

Affective content analysis of music video clips  

Science Conference Proceedings (OSTI)

Nowadays, the amount of multimedia contents is explosively increasing and it is often a challenging problem to find a content that will be appealing or matches users' current mood or affective state. In order to achieve this goal, an effcient indexing ... Keywords: affect, emotion, multimedia content analysis

Ashkan Yazdani; Krista Kappeler; Touradj Ebrahimi

2011-11-01T23:59:59.000Z

296

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release

297

US - Former Soviet Union environmental restoration and waste management activities, March 1994  

Science Conference Proceedings (OSTI)

The Peaceful Uses of Atomic Energy Agreement was signed between DOE and the Ministry of Atomic Energy for the Russian Federation and provides a mechanism for cooperation in research, development, and safe utilization of nuclear energy. Under the umbrella of this agreement, DOE and the former Ministry of Atomic Power and Industry signed a Memorandum of Cooperation in the areas of environmental restoration and waste management in September 1990. This document discusses the environmental situation, science and technology process, technical projects (separations, contaminant transport, waste treatment, environmental restoration), scientist exchanges, enhanced data transfer, the US-Russia industry partnership (conference, centers), and future actions.

Not Available

1994-03-01T23:59:59.000Z

298

Grays River Watershed Restoration Status Report 2007, May 1, 2007 - October 30, 2008.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) Project 2003-013-00, 'Grays River Watershed Restoration', began in FY04 and continues into FY09. This status report is intended to summarize accomplishments during the period 1 May 2007 through 30 October 2008. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). The Pacific Northwest National Laboratory (PNNL) is collaborating with the Columbia River Estuary Task Force (CREST) on implementation of the Grays River Restoration Project. The Grays River is vitally important to the recovery of Lower Columbia River (LCR) chum salmon because it currently has the most viable population remaining in the LCR region. The Grays River watershed is also important to the recovery of salmon and steelhead in the LCR ecosystem. Today, numbers of naturally spawning salmon and steelhead have declined to levels far below historical numbers because of habitat limiting factors that include but are not limited to the lack of habitat connectivity, diversity, channel stability, riparian function and altered stream flow conditions. The objective of this project is to restore habitat-forming processes to enhance salmon and steelhead populations in the Grays River, following recommendations developed during the FY04-06 BPA-sponsored Grays River Watershed Assessment (BPA Project No. 2003-013-00). Specifically, this project will be the first step in restoring channel structure and function that will increase instream habitat diversity, channel stability, and riparian integrity in the critical response reach upstream and adjacent to critical salmon spawning areas of the Grays River. The major component of this strategy is the planning, design, installation, and monitoring of engineered logjams (ELJ) that will rejuvenate historic channel and floodplain processes. Additional restoration measures include reforesting the riparian corridor to enhance future large woody debris recruitment and investigation of conservation activities within ecologically critical areas. These activities include land acquisition and levee removal to protect critical areas and reconnect floodplain areas. Finally, monitoring integrated with restoration activities is proposed to evaluate restoration effectiveness and allow for adaptive management of future restoration treatments in the project area as well as other degraded watersheds in the Lower Columbia River.

Hanrahan, Tim [Pacific Northwest National Laboratory

2008-10-20T23:59:59.000Z

299

Third annual environmental restoration monitoring and assessment report for FY 1994 of the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

This report summarizes the salient features of the annual efforts of environmental monitoring, field investigations, and assessments conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, providing an ORNL site-wide perspective on types, distribution, and transport of contamination. The results presented are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) Project. WAG 2 is the lower portion of the White Oak Creek system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The Remedial Investigation Plan (DOE 1992) for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and the major conduit of contaminants from the ORNL site. During FY 1992, the remedial investigation activities were integrated with a series of environmental monitoring and SI activities at ORNL that address pathways and processes important for contaminant movement to gain a more integrated perspective of contamination movement at the watershed scale.

Clapp, R.B.; Watts, J.A.; Guth, M.A.S. [eds.

1994-09-01T23:59:59.000Z

300

MICROBIAL TRANSFORMATIONS OF RADIONUCLIDES AND ENVIRONMENTAL RESTORATION THROUGH BIOREMEDIATION.  

Science Conference Proceedings (OSTI)

Treatment of waste streams containing radionuclides, the remediation of contaminated materials, soils, and water, and the safe and economical disposal of radionuclides and toxic metals containing wastes is a major concern. Radionuclides may exist in various oxidation states and may be present as oxide, coprecipitates, inorganic, and organic complexes depending on the process and waste stream. Unlike organic contaminants, the metals cannot be destroyed, but must either be converted to a stable form or removed. Microorganisms present in the natural environment play a major role in the mobilization and immobilization of radionuclides and toxic metals by direct enzymatic or indirect non-enzymatic actions and could affect the chemical nature of the radionuclides by altering the speciation, solubility and sorption properties and thus could increase or decrease the concentrations of radionuclides in solution. Fundamental understanding of the mechanisms of microbiological transformations of various chemical forms of uranium present in wastes and contaminated soils and water has led to the development of novel bioremediation processes. One process uses anaerobic bacteria to stabilize the radionuclides by reductive precipitation from higher to lower oxidation state with a concurrent reduction in volume due to the dissolution and removal of nontoxic elements from the waste matrix. In an another process, uranium and other toxic metals are removed from contaminated surfaces, soils, and wastes by extracting with the chelating agent citric acid. Uranium is recovered from the citric acid extract after biodegradation followed by photodegradation in a concentrated form as UO{sub 3} {center_dot} 2H{sub 2}O for recycling or appropriate disposal. These processes use all naturally occurring materials, common soil bacteria, naturally occurring organic compound citric acid and sunlight.

FRANCIS, A.J.

2006-09-29T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Estimation, Economic methodology  

E-Print Network (OSTI)

In this paper I analyse the main strengths and weaknesses of agent-based computational models. I first describe how agent-based simulations can complement more traditional modelling techniques. Then, I rationalise the main theoretical critiques against the use of simulation, which point to the following problematic areas: (i) interpretation of the simulation dynamics, (ii) estimation of the simulation model, and (iii) generalisation of the results. I show that there exist solutions for all these issues. Along the way, I clarify some confounding differences in terminology between the computer science and the economic literature.

Matteo Richiardi; Laboratorio Riccardo; Revelli Centre; Employment Studies; I’m Indebted Francesco Devicienti; Roberto Leombruni; Bruno Contini For Their

2004-01-01T23:59:59.000Z

302

Waste generation forecast for DOE-ORO`s Environmental Restoration OR-1 Project: FY 1995-FY 2002, September 1994 revision  

Science Conference Proceedings (OSTI)

A comprehensive waste-forecasting task was initiated in FY 1991 to provide a consistent, documented estimate of the volumes of waste expected to be generated as a result of U.S. Department of Energy-Oak Ridge Operations (DOE-ORO) Environmental Restoration (ER) OR-1 Project activities. Continual changes in the scope and schedules for remedial action (RA) and decontamination and decommissioning (D&D) activities have required that an integrated data base system be developed that can be easily revised to keep pace with changes and provide appropriate tabular and graphical output. The output can then be analyzed and used to drive planning assumptions for treatment, storage, and disposal (TSD) facilities. The results of this forecasting effort and a description of the data base developed to support it are provided herein. The initial waste-generation forecast results were compiled in November 1991. Since the initial forecast report, the forecast data have been revised annually. This report reflects revisions as of September 1994.

Not Available

1994-12-01T23:59:59.000Z

303

Surface debris inventory at White Wing Scrap Yard, Oak Ridge Reservation, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

An inventory of surface debris in designated grid blocks at the White Wing Scrap Yard [Waste Area Grouping 11 (WAG 11)] was conducted intermittently from February through June 1992 by members of the Measurement Applications and Development Group, Health and Safety Research Division, Oak Ridge National Laboratory (ORNL) at the request of ORNL Environmental Restoration (ER) Program personnel. The objectives of this project are outlined in the following four phases: (1) estimate the amount (volume) and type (e.g., glass, metal and plastics) of surface waste material in 30 designated grid blocks (100- by 100-ft grids); (2) conduct limited air sampling for organic chemical pollutants at selected locations (e.g., near drums, in holes, or other potentially contaminated areas); (3) conduct a walkover gamma radiation scan extending outward (approximately 50 ft) beyond the proposed location of the WAG 11 perimeter fence; and (4) recommend one grid block as a waste staging area. This recommendation is based on location and accessibility for debris staging/transport activities and on low levels of gamma radiation in the grid block.

Rodriguez, R.E.; Tiner, P.F.; Williams, J.K.

1992-08-01T23:59:59.000Z

304

Assess Current and Potential Salmonid Production in Rattlesnake Creek in Association with Restoration Efforts, US Geological Survey Report, 2004-2005 Annual Report.  

SciTech Connect

This project was designed to document existing habitat conditions and fish populations within the Rattlesnake Creek watershed (White Salmon River subbasin, Washington) before major habitat restoration activities are implemented and prior to the reintroduction of salmon and steelhead above Condit Dam. Returning adult salmon Oncorhynchus spp. and steelhead O. mykiss have not had access to Rattlesnake Creek since 1913. An assessment of resident trout populations should serve as a good surrogate for evaluation of factors that would limit salmon and steelhead production in the watershed. Personnel from United States Geological Survey's Columbia River Research Laboratory (USGS-CRRL) attended to three main objectives of the Rattlesnake Creek project. The first objective was to characterize stream and riparian habitat conditions. This effort included measures of water quality, water quantity, stream habitat, and riparian conditions. The second objective was to determine the status of fish populations in the Rattlesnake Creek drainage. To accomplish this, we derived estimates of salmonid population abundance, determined fish species composition, assessed distribution and life history attributes, obtained tissue samples for genetic analysis, and assessed fish diseases in the watershed. The third objective was to use the collected habitat and fisheries information to help identify and prioritize areas in need of restoration. As this report covers the fourth year of a five-year study, it is largely restricted to describing our efforts and findings for the first two objectives.

Allen, M. Brady; Connolly, Patrick J.; Jezorek, Ian G. (US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA)

2006-06-01T23:59:59.000Z

305

Utility Savings Estimators | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

the Utility Savings Estimators: Commercial Estimator | Residential Estimator (These *.zip files contain the Microsoft Excel macro-enabled (*.xlsm) estimator files. You will...

306

Affective-Cognitive learning and decision making: a motivational reward framework for affective agents  

Science Conference Proceedings (OSTI)

In this paper we present a new computational framework of affective-cognitive learning and decision making for affective agents, inspired by human learning and recent neuroscience and psychology. In the proposed framework ‘internal reward from ...

Hyungil Ahn; Rosalind W. Picard

2005-10-01T23:59:59.000Z

307

Evaluation of Life History Diversity, Habitat Connectivity, and Survival Benefits Associated with Habitat Restoration Actions in the Lower Columbia River and Estuary, Annual Report 2010  

Science Conference Proceedings (OSTI)

This report describes the 2010 research conducted under the U.S. Army Corps of Engineers (USACE) project EST-P-09-1, titled Evaluation of Life History Diversity, Habitat Connectivity, and Survival Benefits Associated with Habitat Restoration Actions in the Lower Columbia River and Estuary, and known as the 'Salmon Benefits' study. The primary goal of the study is to establish scientific methods to quantify habitat restoration benefits to listed salmon and trout in the lower Columbia River and estuary (LCRE) in three required areas: habitat connectivity, early life history diversity, and survival (Figure ES.1). The general study approach was to first evaluate the state of the science regarding the ability to quantify benefits to listed salmon and trout from habitat restoration actions in the LCRE in the 2009 project year, and then, if feasible, in subsequent project years to develop quantitative indices of habitat connectivity, early life history diversity, and survival. Based on the 2009 literature review, the following definitions are used in this study. Habitat connectivity is defined as a landscape descriptor concerning the ability of organisms to move among habitat patches, including the spatial arrangement of habitats (structural connectivity) and how the perception and behavior of salmon affect the potential for movement among habitats (functional connectivity). Life history is defined as the combination of traits exhibited by an organism throughout its life cycle, and for the purposes of this investigation, a life history strategy refers to the body size and temporal patterns of estuarine usage exhibited by migrating juvenile salmon. Survival is defined as the probability of fish remaining alive over a defined amount of space and/or time. The objectives of the 4-year study are as follows: (1) develop and test a quantitative index of juvenile salmon habitat connectivity in the LCRE incorporating structural, functional, and hydrologic components; (2) develop and test a quantitative index of the early life history diversity of juvenile salmon in the LCRE; (3) assess and, if feasible, develop and test a quantitative index of the survival benefits of tidal wetland habitat restoration (hydrologic reconnection) in the LCRE; and (4) synthesize the results of investigations into the indices for habitat connectivity, early life history diversity, and survival benefits.

Diefenderfer, Heida L.; Johnson, Gary E.; Sather, Nichole K.; Skalski, J. R.; Dawley, Earl M.; Coleman, Andre M.; Ostrand, Kenneth G.; Hanson, Kyle C.; Woodruff, Dana L.; Donley, Erin E.; Ke, Yinghai; Buenau, Kate E.; Bryson, Amanda J.; Townsend, Richard L.

2011-10-01T23:59:59.000Z

308

Habitat Restoration/Enhancement Fort Hall Reservation : 2001 Annual Report.  

DOE Green Energy (OSTI)

Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2001. Enhancement and protection included sloping, fencing and planting willows at sites on Diggie Creek, Clear Creek and Spring Creek. In addition, many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). In 2001, exclosure fences were erected on Diggie Creek (250 m barbed wire; (70 m jack), Wood Creek (500 m jack), Clear Creek (20 m jack), Ross Fork Creek (200 m jack), West Fork Creek (200 m jack)) and the Portneuf River (1 km barbed wire; 100 m jack). Jack and rail exclosure fences that had deteriorated over the past ten years were repaired at numerous areas throughout the Reservation. Physical sampling during 2001 included sediment and depth surveys (SADMS) in Big Jimmy Creek and Diggie Creek. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for eight and nine strata in the Big Jimmy and Diggie Creek, respectively. Baseline SADM data was collected in Diggie Creek to monitor the effects of bank sloping and revegetation on channel morphology and sediment levels through time. Water temperature was monitored (hourly) in Spring Creek, Clear Creek, Ross Fork Creek and Big Jimmy Creek. Biotic sampling included invertebrate sampling in the 200 and 300 series of Clear Creek. Fish population densities and biomass were sampled in Clear Creek 200 and 300 series. Sampling protocols were identical to methods used in past years. Numbers of fish in Clear Creek 300 series remained similar to 2000 while numbers of fish in Clear Creek 200 series dropped to near pre project levels. Salmonid fry densities were monitored near Broncho Bridge and were significantly higher than 2000. A mark-recapture study was initiated in spring 2001 to estimate numbers of spawning adults using the Head End of Spring Creek Mean catch rate by anglers on Bottoms streams increased from 0.55 in 2000 to 0.77 fish per hour in 2001. Numbers of fish 18 inches caught by anglers decreased from 0.41 in 2000 to 0.19 in 2001.

Moser, David C.

2003-03-01T23:59:59.000Z

309

WATERSHED RESTORATION IN THE NORTHERN SIERRA NEVADA: A BIOTECHNICAL APPROACH1  

E-Print Network (OSTI)

- dustrial, recreational, and energy-producing uses in the state. This trend is reflected in the growing Pollution Control Act, and the amended Clean Water Act of 1987. Califor- nia is presently developing, and research papers. Institutional incentives for riparian restoration lag far behind available technology

Standiford, Richard B.

310

A knowledge-based method for making restoration plan of bulk power system  

SciTech Connect

In this paper a knowledge-based method is proposed for use in event of power system outages. This method uses general-purpose restoration knowledge not dependent on pre-outage system states in order to generate post-restoration target systems in which post-outage systems are taken as initial states. Conventionally post-outage system states are formed to emulate as closely as possible pre-outage system states, with system operations performed only within blackout systems. Therefore, depending on the amount of pre-outage load, some outage loads may be experienced in the restored system. Proposed here is a method by which system operations in both blackout systems and sound systems are combined according to the amount of load in the pre-outage systems, so that post-restoration system states with minimal outage loads from post-outage systems will be generated. A prototype system incorporating actual power systems and utilizing this method was built and tested under simulated conditions. The effectiveness of the proposed system is discussed on the basis of the test results.

Shimakura, K.; Inagaki, J.; Matsunoki, Y. (Hokkaido Univ., Sapporo (Japan). Faculty of Science); Ito, M.; Fukui, S.; Hori, S. (Mitsubishi Electric Corp., 1-1-2 Wadasaki-cho, Hyogo-ku, Kobe (JP))

1992-05-01T23:59:59.000Z

311

Evaluating Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2009  

SciTech Connect

This is the sixth annual report of a seven-year project (2004 through 2010) to evaluate the cumulative effects of habitat restoration actions in the lower Columbia River and estuary (LCRE). The project, called the Cumulative Effects Study, is being conducted for the U.S. Army Corps of Engineers Portland District (USACE) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory (PNNL), the Pt. Adams Biological Field Station of the National Marine Fisheries Service (NMFS), the Columbia River Estuary Study Taskforce (CREST), and the University of Washington. The goal of the Cumulative Effects Study is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the 235-km-long LCRE. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. From 2005 through 2009, annual field research involved intensive, comparative studies paired by habitat type (tidal swamp versus marsh), trajectory (restoration versus reference site), and restoration action (tidegate replacement vs. culvert replacement vs. dike breach).

Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Bryson, Amanda J.; Cameron, April; Coleman, Andre M.; Corbett, C.; Dawley, Earl M.; Ebberts, Blaine D.; Kauffman, Ronald; Roegner, G. Curtis; Russell, Micah T.; Silva, April; Skalski, John R.; Thom, Ronald M.; Vavrinec, John; Woodruff, Dana L.; Zimmerman, Shon A.

2010-10-26T23:59:59.000Z

312

Re: BPA FY 07-09 Project Proposal #200711200 Teanaway Watershed Protection and Restoration  

E-Print Network (OSTI)

Re: BPA FY 07-09 Project Proposal #200711200 Teanaway Watershed Protection and Restoration Kittitas draft province recommendations). The conservation easements acquisition costs qualify for funding by BPA as a Capital investment, as indicated in the Project Narrative on page 8. Proposed Project Funding Allocation

313

Technology Assessment and Application Guide for Micro Dynamic Voltage Restorer (DVR)  

Science Conference Proceedings (OSTI)

This report describes and documents the construction, performance, and application of a micro dynamic voltage restorer (DVR). The system is a prototype developed by the researchers at the University of Săo Paulo located in Brazil, South America. The report describes the operation and performance evaluation results of the Micro DVR and issues related to application and installation.

2008-12-19T23:59:59.000Z

314

DC-AC Inverters for Static Condenser and Dynamic Voltage Restorer Applications  

Science Conference Proceedings (OSTI)

There has been significant recent interest in general classes of power electronic-based active power conditioners such as static condensers and dynamic voltage restorers. These systems are discussed in this paper with a focus on the inverter output stage. ... Keywords: Power Quality, Static var Compensators, Custom Power

Steven R. Ashcraft; S. Mark Halpin

1996-03-01T23:59:59.000Z

315

Stability boundary analysis of the dynamic voltage restorer in weak systems with dynamic loads  

Science Conference Proceedings (OSTI)

In this contribution, a stability analysis for a dynamic voltage restorer (DVR) connected to a weak ac system containing a dynamic load is presented using continuation techniques and bifurcation theory. The system dynamics are explored through the continuation ... Keywords: DVR, Floquet multiplier, active filter, continuation techniques, iterative map, point common coupling, power converter, stability regions, switching process

Juan Segundo-Ramírez; Aurelio Medina; Arindam Ghosh; Gerard Ledwich

2012-06-01T23:59:59.000Z

316

Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary  

SciTech Connect

Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

2008-04-25T23:59:59.000Z

317

Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site  

SciTech Connect

The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

Hutchison, J.; Jernigan, G.

1989-12-01T23:59:59.000Z

318

Patch-Burning: "Rotational Grazing Without Fences" Using Fire and Grazing to Restore Diversity on Grasslands  

E-Print Network (OSTI)

Patch-Burning: "Rotational Grazing Without Fences" Using Fire and Grazing to Restore Diversity characteristics. Patch Burning and Grazing Can Promote Diversity The objective of patch burning is to create State University burn portions of unfenced landscapes each year. Livestock focus grazing on recently

Debinski, Diane M.

319

Restoring forest landscapes for biodiversity conservation and rural livelihoods: A spatial optimisation model  

Science Conference Proceedings (OSTI)

Conserving nature in the presence of humans is especially challenging in areas where livelihoods are largely based on locally available natural resources. The restoration of forests in such contexts calls for the identification of sites and actions that ... Keywords: Ecosystem services, Integer-linear programming (ILP), Land use allocation, Poverty, Reforestation priorities, Spatial optimisation, Timber harvest

Francesco Orsi; Richard L. Church; Davide Geneletti

2011-12-01T23:59:59.000Z

320

Hydrologic and Water-Quality Conditions During Restoration of the Wood River Wetland,  

E-Print Network (OSTI)

.S. Geological Survey #12;Front Cover: Aerial view of the lower Wood River Valley showing the Wood River Wetland.S. Geological Survey, January 2003. #12;Hydrologic and Water-Quality Conditions During Restoration of the Wood­5004 U.S. Department of the Interior U.S. Geological Survey #12;U.S. Department of the Interior KEN

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Responses of upland herpetofauna to the restoration of Carolina Bays and thinning of forested Bay Margins.  

Science Conference Proceedings (OSTI)

Research on the effects of wetland restoration on reptiles and amphibians is becoming more common, but almost all of these studies have observed the colonization of recently disturbed habitats that were completely dry at the time of restoration. In a similar manner, investigations herpetofaunal responses to forest management have focused on clearcuts, and less intensive stand manipulations are not as well studied. To evaluate community and population responses of reptiles and amphibians to hydrology restoration and canopy removal in the interior of previously degraded Carolina bays, I monitored herpetofauna in the uplands adjacent to six historically degraded Carolina bays at the Savannah River Site (SRS) in South Carolina for four years after restoration. To evaluate the effects of forest thinning on upland herpetofauna, forests were thinned in the margins of three of these bays. I used repeated measures ANOVA to compare species richness and diversity and the abundance of selected species and guilds between these bays and with those at three reference bays that were not historically drained and three control bays that remained degraded. I also used Non-metric Multidimensional Scaling (NMDS) to look for community-level patterns based treatments.

Ledvina, Joseph A.

2008-05-01T23:59:59.000Z

322

Statistical Mechanics of Image Restoration by the Plane Rotator Model Yo^hei SAIKA and Hidetoshi NISHIMORI1  

E-Print Network (OSTI)

Statistical Mechanics of Image Restoration by the Plane Rotator Model Yo^hei SAIKA and Hidetoshi) On the basis of statistical mechanics formulation for problems of image restoration and error- correcting codes image is faster than that by the Ising model at low temperature. KEYWORDS: statistical mechanics, image

Nishimori, Hidetoshi

323

TMS320F2812 DSP controller for dynamic voltage restorer (DVR) application for improving of a three phase inverter  

Science Conference Proceedings (OSTI)

This paper discusses a control technique improvement of a three-phase inverter using TMS320F2812 DSP controller for Dynamic Voltage Restorer (DVR) applications. The output of the inverter is then connected to a voltage grid via a second order filter ... Keywords: TMS320F2812 DSP, dynamic voltage restorer (DVR), filter, inverters, total harmonic distortion (THD)

R. Omar; N. A. Rahim

2010-07-01T23:59:59.000Z

324

Multi-modal affect induction for affective brain-computer interfaces  

Science Conference Proceedings (OSTI)

Reliable applications of affective brain-computer interfaces (aBCI) in realistic, multi-modal environments require a detailed understanding of the processes involved in emotions. To explore the modalityspecific nature of affective responses, we studied ... Keywords: ECG, EEG, affective brain-computer interfaces, auditory, emotion, multi-modal, visual

Christian Mühl; Egon L. van den Broek; Anne-Marie Brouwer; Femke Nijboer; Nelleke van Wouwe; Dirk Heylen

2011-10-01T23:59:59.000Z

325

Estimation of the Mean Field Bias of Radar Rainfall Estimates  

Science Conference Proceedings (OSTI)

In this paper procedures are developed for estimating the mean field bias of radar rainfall estimates. Mean field bias is modeled as a random process that varies not only from storm to storm but also over the course of a storm. State estimates of ...

James A. Smith; Witold F. Krajewski

1991-04-01T23:59:59.000Z

326

Estimating fracture apertures from hydraulic data and comparison with theory  

DOE Green Energy (OSTI)

Estimates of fracture openings, or apertures, were made for massive hydraulic fracture experiments at the Hot Dry Rock geothermal reservoir at Fenton Hill, New Mexico. The basis of these estimates is that if the injection rate is suddenly increased during fracturing, and the subsequent pressure increase to sustain this additional flow is measured, then the pressure increase must be related to the fracture aperture. More detailed considerations indicate that the fracture aperture estimated in this manner is affected by the nature of the fracture geometry, its propagation distance, and its viscous characteristics, but these effects are surprisingly unimportant. The result is a reasonably accurate aperture estimate, which considering the elusive nature of this measurement by other means, is quite satisfactory. These estimates are in good agreement with the fracturing theory of Geertsma and de Klerk. 10 refs., 6 figs.

Dash, Z.V.; Murphy, H.D.

1985-01-01T23:59:59.000Z

327

Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

Dennis, C.; Stefano, J.

1993-07-01T23:59:59.000Z

328

Working Paper No. 789 ESTIMATING COKE AND PEPSI'S PRICE  

E-Print Network (OSTI)

. GENERALIZED-MAXIMUM-ENTROPY ESTIMATION APPROACH 7 3.1 Background: Classical Maximum Entropy Formulation 7 3 games, oligopoly, generalized maximum entropy, beverages JEL: C13, C35, C72, L13, L66 #12 strategies to depend on variables that affect demand and cost. The second method adds restrictions from game

Kammen, Daniel M.

329

Estimate HRSG performance quickly  

SciTech Connect

Heat recovery steam generators (HRSG) are coupled to a heat recovery source which exhausts hot gases, such as gas turbines, furnaces, kilns, etc., to generate steam for the plant's process or power needs. When two pieces of equipment are coupled, their performances may not match their respective design or maximum efficiency points due to varying plant load or steam demand. In addition, many plants require the HRSG to operate effectively over the entire operating range of the plant. In chemical and fertilizer plants, hot gas is cooled in the HRSG to the required limiting temperature. In plants using gas turbines, even ambient conditions will affect HRSG performance indirectly. So a plant engineer should be able to predict the HRSG performance at any design point called for by the plant's load or steam demand.

Kuppuraj, K.

1986-07-01T23:59:59.000Z

330

Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary  

SciTech Connect

This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

Not Available

1991-09-01T23:59:59.000Z

331

Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary  

SciTech Connect

This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

1991-09-01T23:59:59.000Z

332

RESTORING SUSTAINABLE FORESTS ON APPALACHIAN MINED LANDS FOR WOOD PRODUCTS, RENEWABLE ENERGY, CARBON SEQUESTRATION, AND OTHER ECOSYSTEM SERVICES  

DOE Green Energy (OSTI)

The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. We are currently estimating the acreage of lands in VA, WV, KY, OH, and PA mined under SMCRA and reclaimed to non-forested post-mining land uses that are not currently under active management, and therefore can be considered as available for carbon sequestration. To determine actual sequestration under different forest management scenarios, a field study was installed as a 3 x 3 factorial in a random complete block design with three replications at each of three locations, Ohio, West Virginia, and Virginia. The treatments included three forest types (white pine, hybrid poplar, mixed hardwood) and three silvicultural regimes (competition control, competition control plus tillage, competition control plus tillage plus fertilization). Each individual treatment plot is 0.5 acres. Each block of nine plots requires 4.5 acres, and the complete installation at each site requires 13.5 acres. The plots at all three locations have been installed and the plot corners marked with PVC stakes. GPS coordinates of each plot have been collected. Tree survival, height and diameter were measured after the first growing season. There were significant treatment and treatment x site interactions. A STELLA{reg_sign}-based model helped us develop insight as to whether it is possible to differentiate the permanent SOC from the C contained in the labile forms of SOM. The model can be used for predicting the amount of C sequestered on mine lands, and the amount of C that is expected to reside in the mine soil for more than 1,000 years. Based on our work, it appears that substantial carbon payments to landowners would be required to reach ''profitability'' under present circumstances. However, even though the payments that we examine could generate non-negative LEVs, there is no guarantee that the payments will actually cause landowners to reforest in practice. It is landowner utility associated with forestland profitability that will be the determining factor in actual conversion--utility that likely would include cash flow timing, amenities, and even the credit position of the landowner.

James A. Burger; J. Galbraith; T. Fox; G. Amacher; J. Sullivan; C. Zipper

2004-11-29T23:59:59.000Z

333

RESTORING SUSTAINABLE FORESTS ON APPALACHIAN MINED LANDS FOR WOOD PRODUCTS, RENEWABLE ENERGY, CARBON SEQUESTRATION, AND OTHER ECOSYSTEM SERVICES  

DOE Green Energy (OSTI)

The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. We are currently estimating the acreage of lands in VA, WV, KY, OH, and PA mined under SMCRA and reclaimed to non-forested post-mining land uses that are not currently under active management, and therefore can be considered as available for carbon sequestration. To determine actual sequestration under different forest management scenarios, a field study was installed as a 3 x 3 factorial in a random complete block design with three replications at each of three locations, Ohio, West Virginia, and Virginia. The treatments included three forest types (white pine, hybrid poplar, mixed hardwood) and three silvicultural regimes (competition control, competition control plus tillage, competition control plus tillage plus fertilization). Each individual treatment plot is 0.5 acres. Each block of nine plots is 4.5 acres, and the complete installation at each site is 13.5 acres. During the reporting period we compiled and evaluated all soil properties measured on the study sites. Statistical analysis of the properties was conducted, and first year survival and growth of white pine, hybrid poplars, and native hardwoods was assessed. Hardwood species survived better at all sites than white pine or hybrid poplar. Hardwood survival across treatments was 80%, 85%, and 50% for sites in Virginia, West Virginia, and Ohio, respectively, while white pine survival was 27%, 41%, and 58%, and hybrid poplar survival was 37%, 41%, and 72% for the same sites, respectively. Hybrid poplar height and diameter growth were superior to those of the other species tested, with the height growth of this species reaching 126.6cm after one year in the most intensive treatment at the site in Virginia. To determine carbon in soils on these sites, we developed a cost-effective method for partitioning total soil carbon to pedogenic carbon and geogenic carbon in mine soils. We are in the process of evaluating the accuracy and precision of the proposed carbon partitioning technique for which we are designing an experiment with carefully constructed mine soil samples. In a second effort, as part of a mined land reforestation project for carbon sequestration in southwestern Virginia we implemented the first phase of the carbon monitoring protocol that was recently delivered to DOE.

James A. Burger; J. Galbraith; T. Fox; G. Amacher; J. Sullivan; C. Zipper

2005-06-08T23:59:59.000Z

334

Variables Affecting Economic Development of Wind Energy  

DOE Green Energy (OSTI)

NREL's JEDI Wind model performed an analysis of wind-power-related economic development drivers. Economic development benefits for wind and coal were estimated using NREL's JEDI Wind and JEDI Coal models.

Lantz, E.; Tegen, S.

2008-07-01T23:59:59.000Z

335

Variables Affecting Economic Development of Wind Energy  

SciTech Connect

NREL's JEDI Wind model performed an analysis of wind-power-related economic development drivers. Economic development benefits for wind and coal were estimated using NREL's JEDI Wind and JEDI Coal models.

Lantz, E.; Tegen, S.

2008-07-01T23:59:59.000Z

336

Environmental Factors Affecting Tropical Cyclone Power Dissipation  

Science Conference Proceedings (OSTI)

Revised estimates of kinetic energy production by tropical cyclones in the Atlantic and western North Pacific are presented. These show considerable variability on interannual-to-multidecadal time scales. In the Atlantic, variability on time ...

Kerry Emanuel

2007-11-01T23:59:59.000Z

337

Estimating Civilian Owned Firearms  

E-Print Network (OSTI)

Most of the world’s firearms are privately owned. 1 They include improvised craft guns as well as handguns, rifles, shotguns, and machine guns. The legal definition of a civilian firearm varies; some states allow civilian ownership of certain firearms that are restricted to military use in other states. The word civilian is used here to refer to actual possession, not legality. In 2007, the Small Arms Survey estimated the number of civilian firearm ownership worldwide at approximately 650 million weapons out of some 875 then in existence (see Figures 1 and 2). National ownership rates range from a high of 90 firearms per every 100 people in the United States, to one firearm or less for every 100 residents in countries like South Korea and Ghana (see Table 1). With the world’s factories delivering millions of newly manufactured firearms annually, and with far fewer being destroyed, civilian ownership is growing (Small Arms Survey, 2007, p. 39). Poor record-keeping and the near absence of reporting requirements for detailed information complicate assessments of global stockpiles of small arms and light weapons. When it comes to estimating civilian firearm ownership, differences in national gun culture —each country’s unique combination of historic and current sources of supply, laws and attitudes toward firearms ownership—often have distinct effects on the classification, ownership and perception of firearms. In addition, categories of firearm holders may overlap, as some individuals may use their private firearms at work as security guards, in armed groups, or in gangs.

unknown authors

2011-01-01T23:59:59.000Z

338

Empirical Methods of Cost Estimation  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

339

Optimal estimation with limited measurements  

Science Conference Proceedings (OSTI)

This paper introduces a sequential estimation problem with two decision makers, or agents, who work as members of a team. One of the agents sits at an observation post, and makes sequential observations about the state of an underlying stochastic process ... Keywords: WSNs, limited information, networked control systems, optimal estimation, real-time control, real-time monitoring, recursive estimation, sequential estimation, wireless networks, wireless sensor networks

Orhan C. Imer; Tamer Basar

2010-01-01T23:59:59.000Z

340

Power Ratio Estimation in Incoherent Backscatter Lidar: Heterodyne Receiver with Square Law Detection  

Science Conference Proceedings (OSTI)

Comparative return irradiance estimation in a two channel heterodyne lidar receiver should be facilitated by processing finite data samples obtained in a period short compared with that of atmospheric fluctuations affecting beam propagation. Here ...

B. J. Rye

1983-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Modelling affect expression and recognition in an interactive learning environment  

Science Conference Proceedings (OSTI)

Affective reasoning holds significant potential for intelligent tutoring systems. Incorporating affective reasoning into pedagogical decision-making capabilities could enable learning environments to create customised experiences that are dynamically ... Keywords: HCI, ITS, affect expression, affect recognition, affective student modelling, empathy, human-computer interaction, inductive learning, intelligent tutoring systems, interactive learning, physiological response, self-efficacy, situational context, student affect

Scott W. McQuiggan; James C. Lester

2009-10-01T23:59:59.000Z

342

The uncertainties in estimating measurement uncertainties  

SciTech Connect

All measurements include some error. Whether measurements are used for accountability, environmental programs or process support, they are of little value unless accompanied by an estimate of the measurements uncertainty. This fact is often overlooked by the individuals who need measurements to make decisions. This paper will discuss the concepts of measurement, measurements errors (accuracy or bias and precision or random error), physical and error models, measurement control programs, examples of measurement uncertainty, and uncertainty as related to measurement quality. Measurements are comparisons of unknowns to knowns, estimates of some true value plus uncertainty; and are no better than the standards to which they are compared. Direct comparisons of unknowns that match the composition of known standards will normally have small uncertainties. In the real world, measurements usually involve indirect comparisons of significantly different materials (e.g., measuring a physical property of a chemical element in a sample having a matrix that is significantly different from calibration standards matrix). Consequently, there are many sources of error involved in measurement processes that can affect the quality of a measurement and its associated uncertainty. How the uncertainty estimates are determined and what they mean is as important as the measurement. The process of calculating the uncertainty of a measurement itself has uncertainties that must be handled correctly. Examples of chemistry laboratory measurement will be reviewed in this report and recommendations made for improving measurement uncertainties.

Clark, J.P.; Shull, A.H.

1994-07-01T23:59:59.000Z

343

Estimating the Spatial Distribution of Population without Power during Extreme Weather Events  

SciTech Connect

One challenge in emergency preparedness and response during extreme weather events such as hurricanes and ice storms is estimating how many people may be without power and how long they could be without power. In this presentation, we will discuss a method for estimating the spatial distribution of people without power during extreme weather events. The method is based on a directional nearest-neighbor approach in which grid cells representing substation locations acquire other grid cells representing customers/population demand with respect to the capacity of each substation. We also present a method for estimating restoration time in case of an outage. The application of these methods during the 2008 hurricane season will also be discussed.

Omitaomu, Olufemi A [ORNL; Fernandez, Steven J [ORNL; Bhaduri, Budhendra L [ORNL

2010-01-01T23:59:59.000Z

344

NEPA COMPLIANCE SURVEY Project Information Project Title: T-1-21 Restoration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-21 Restoration 1-21 Restoration Date: 12-22-2010 DOE Code: Contractor Code: Project Lead : Bernard Winfree Project Overview 1. What are the environmental The existing building will be removed from the site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out of the piping. We will then cut off the pipes at the lowest 2. What is the legal location? possible point At this time a com posit soil sample will be taken of the area. When the samples come back under the established limits, we will backfill the hole with the existing materials and recontour the site to 3. What is the duration of the project? perexisting conditions. Reseeding will be initiated when the proper seed mix is established. This is an

345

S M Stoller Pinellas Environmental Restoration Project - Young- Rainey Star Center  

Office of Legacy Management (LM)

Pinellas Environmental Restoration Project - Young- Rainey Star Center Pinellas Environmental Restoration Project - Young- Rainey Star Center 110406202 Accutest Job Number: F33039 Sampling Date: 07/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

346

Method for in-situ restoration of platinum resistance thermometer calibration  

DOE Patents (OSTI)

A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or stain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's. 1 fig.

Carroll, R.M.

1987-10-23T23:59:59.000Z

347

DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent  

Office of Legacy Management (LM)

Ru\-- 7-2-4@ Ru\-- 7-2-4@ DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent Pond Site Long-Term Groundwater Monitoring Plan July 1996 Environmental Restoration U.S. Department of Energy This report has been reproduced from the best available copy. Available in paper copy and microfiche. Number of pages in this report: 5 1 DOE and DOE contractors cari obtain copies of this report from: Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 3783 1. (61 5) 576-8401. This report is publicly available from the Department of Commerce, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22 16 1. (703) 487-4650. RULISON DRILLING EFFLUENT POND SITE LONG-TERM GROUNDWATER MONITORING PLAN DOE Nevada Operations Office

348

Pinellas Environmental Restoration Project Quarterly Progress Report, Sitewide, January through March 2004  

Office of Legacy Management (LM)

44 44 2004 GJ - - U.S. Department of Energy Pinellas Environmental Restoration Project Sitewide Environmental Monitoring Quarterly Progress Report for the Young-Rainey STAR Center January Through March 2004 April 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management N00074400 DOE-LM/GJ644-2004 Pinellas Environmental Restoration Project Sitewide Environmental Monitoring Quarterly Progress Report for the Young - Rainey STAR Center January through March 2004 April 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491

349

S M Stoller Pinellas Environmental Restoration Project - Young- Rainey Star Center  

Office of Legacy Management (LM)

Pinellas Environmental Restoration Project - Young- Rainey Star Center Pinellas Environmental Restoration Project - Young- Rainey Star Center 7030-226 Accutest Job Number: F29125 Sampling Date: 01/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

350

A Review of Power Outages and Restoration Following the June 2012 Derecho  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2012 August 2012 A Review of Power Outages and Restoration Following the June 2012 Derecho Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific questions about this report may be directed to Alice Lippert, Senior Technical Advisor (alice.lippert@hq.doe.gov). (Cover image from the National Weather Service) OE/ISER 8/6/2012 1 Background On June 29, 2012, a major storm system known as a derecho ("deh-REY-cho") formed and

351

South Fork Salmon River Watershed Restoration, 2008-2009 Annual Report.  

DOE Green Energy (OSTI)

The watershed restoration work elements within the project area, the South Fork Salmon River Watershed, follow the watershed restoration approach adopted by the Nez Perce Tribe Department of Fisheries Resource Management (DFRM) - Watershed Division. The vision of the Nez Perce Tribe DFRM-Watershed Division focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects and strategies that rely on natural fish production and healthy river ecosystems. The Nez Perce Tribe DFRM-Watershed Division strives towards maximizing historic ecosystem productivity and health for the restoration of anadromous and resident fish populations and the habitat on which all depend on for future generations Originally, this project was funded to create a step/pool stream channel that was appropriate to restore fish passage where the 'Glory Hole Cascade' is currently located at the Stibnite Mine. Due to unforeseen circumstances at the time, the project is unable to move forward as planned and a request for a change in scope of the project and an expansion of the geographic area in which to complete project work was submitted. No additional funds were being requested. The ultimate goal of this project is to work with the holistic, ridge top to ridge top approach to protect and restore the ecological and biological functions of the South Fork Salmon River Watershed to assist in the recovery of threatened and endangered anadromous and resident fish species. FY 2008 Work Elements included two aquatic organism passage (AOP) projects to restore habitat connectivity to two fish-bearing tributaries to the East Fork South Fork Salmon River, Salt and Profile Creeks. The Work Elements also included road survey and assessment activities that move toward road decommissioning to reduce sediment delivery to spawning gravels and rearing habitats by reducing sedimentation from road related, man-made sources. For FY08, the project included the design and implementation of two fish barrier replacement structures mentioned above, the Salt and Profile Creek Bridges. These work elements were to be implemented on Valley County easements within the Payette National Forest. The existing culverts are full or partial barriers to most aquatic life species and all juvenile anadromous and resident fish species. Implementation will reconnect 9.34 miles of habitat, and provide natural stream channels to facilitate complete passage for all aquatic life forms. All designs were completed and a construction subcontract was awarded to construct free span, pre-cast concrete bridges. For 2008, the project statement of work also included all the necessary work elements to manage, coordinate, plan, and develop continuing strategies for restoration and protection activities.

Reaney, Mark D. [Nez Perce Tribe Department of Fisheries Resource Management

2009-04-15T23:59:59.000Z

352

Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor  

SciTech Connect

The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor`s (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor`s management plan.

Beckman, W.H.; Cossel, S.C.; Alhadeff, N. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project; Porco, D.J. [Jacobs Engineering Co., Pasadena, CA (United States); Lindamood, S.B. [Jacobs Engineering Co., Pasadena, CA (United States); Beers, J.A. [Fluor Daniel Corp. (United States)

1993-10-01T23:59:59.000Z

353

Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3  

Science Conference Proceedings (OSTI)

This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.

Garrison, R.C.

1995-02-01T23:59:59.000Z

354

Restoring a Degraded Rangeland: Using Fire and Herbivory to Control Opuntia Cacti Encroachment  

E-Print Network (OSTI)

Innovative restoration strategies are critically needed in the South Texas Plains for controlling increased Opuntia cacti invasions. Using a replicated and randomized experimental study, I have examined the effects of fire seasonality and herbivory on the dominant cacti and herbaceous plant species in this semi-arid ecosystem. Results from this study demonstrate that the combination of fire and wildlife herbivory significantly reduces Opuntia cactus cover. I was able to empirically demonstrate that prescribed fire decreases prickly pear cactus cover. Moreover, this decrease is further exacerbated by the effects of large mammalian herbivores consuming and/or disturbing recently burned mottes. In the absence of fire, both mottes with and without herbivore exclosures increased in size. The ecological insights gained from this study will contribute to the development of management strategies of Opuntia cacti, while promoting the restoration and long-term sustainability of Texas rangelands.

Sosa, Gabriela

2009-12-01T23:59:59.000Z

355

ITEP: A survey of innovative environmental restoration technologies in the Netherlands and France  

Science Conference Proceedings (OSTI)

The International Technology Exchange Program (ITEP) of the Department of Energy`s (DOE`s) Office of Environmental Management (EM) is responsible for promoting the import of innovative technologies to better address EM`s needs and the export of US services into foreign markets to enhance US competitiveness. Under this program, potentially innovative environmental restoration technologies, either commercially available or under development in the Netherlands and France, were identified, described, and evaluated. It was found that 12 innovative environmental restoration technologies, which are either commercially available or under development in the Netherlands and France, may have some benefit for the DOE EM program and should be considered for transfer to the United States.

Roberds, W.J.; Voss, C.F.; Hitchcock, S.A. [Golder Associates, Inc., Redmond, WA (United States)

1995-05-01T23:59:59.000Z

356

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2003 29, 2003 To: People Interested in the Project to Mitigate and Restore White Sturgeon Populations in the Columbia and Snake Rivers Bonneville Power Administration (BPA) has prepared the Final Environmental Assessment (EA), which includes a Finding of No Significant Impact (FONSI), for the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The document is enclosed for your information. Background: Since 1986, State, Federal, and Tribal fisheries agencies have been gathering data and studying habitats, movements, population dynamics, feeding, and distribution of white sturgeon in the Columbia River system. With the decline in anadromous salmonid runs there has been an increase in the importance of the white sturgeon fisheries. The Oregon Department of

357

Environmental Statements, Availability, Etc., Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8679 8679 Thursday June 1, 1995 Part III Department of Energy Environmental Statements, Availability, Etc.; Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs: Notice 28680 Federal Register / Vol. 60, No. 105 / Thursday, June 1, 1995 / Notices DEPARTMENT OF ENERGY Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs AGENCY: Department of Energy. ACTION: Record of decision. SUMMARY: The Department of Energy has issued a Record of Decision on Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs. The Record of Decision includes a Department-wide decision to

358

Low voltage ride-through capability improvement of wind power generation using dynamic voltage restorer  

Science Conference Proceedings (OSTI)

Recently, the total amount of generation from wind power plants has been increased all over the world. In this situation, a large amount of disconnection of wind generation may give a serious influence in the power system. Consequently, Low Voltage Ride-Through ... Keywords: dynamic voltage restorer, energy storage, fault ride-through, fixed-speed induction generator, low voltage ride-through, voltage sag, wind power generation

Naohiro Hasegawa; Teruhisa Kumano

2010-02-01T23:59:59.000Z

359

RESTORING A DAMAGED 16-YEAR -OLD INSULATING POLYMER CONCRETE DIKE OVERLAY: REPAIR MATERIALS AND TECHNOLOGIES.  

Science Conference Proceedings (OSTI)

The objective of this program was to design and formulate organic polymer-based material systems suitable for repairing and restoring the overlay panels of insulating lightweight polymer concrete (ILPC) from the concrete floor and slope wall of a dike at KeySpan liquefied natural gas (LNG) facility in Greenpoint, Brooklyn, NY, just over sixteen years ago. It also included undertaking a small-scale field demonstration to ensure that the commercial repairing technologies were applicable to the designed and formulated materials.

SUGAMA,T.

2007-01-01T23:59:59.000Z

360

Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93  

Science Conference Proceedings (OSTI)

This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites.

Not Available

1993-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

State estimation on correlated copies  

E-Print Network (OSTI)

State estimation is usually analyzed in the situation when copies are in a product state, either mixed or pure. We investigate here the concept of state estimation on correlated copies. We analyze state estimation on correlated N qubit states, which are permutationally invariant. Using a correlated state we try to estimate as good as possible the direction of the Bloch vector of a single particle reduced density matrix. We derive the optimal fidelity for all permutation invariant states. We find the optimal state, which yields the highest estimation fidelity among the states with the same reduced density matrix. Interestingly this state is not a product state. We also point out that states produced by optimal universal cloning machines are the worst form the point of view of estimating the reduced density matrix.

Rafal Demkowicz-Dobrzanski

2004-12-20T23:59:59.000Z

362

A framework for evaluating innovative statistical and risk assessment tools to solve environment restoration problems  

Science Conference Proceedings (OSTI)

Environmental restoration activities at the US Department of Energy (DOE) Hanford site face complex issues due to history of varied past contaminant disposal practices. Data collection and analysis required for site characterization, pathway modeling, and remediation selection decisions must deal with inherent uncertainties and unique problems associated with the restoration. A framework for working through the statistical aspects of the site characterization and remediation selection problems is needed. This framework would facilitate the selection of appropriate statistical tools for solving unique aspects of the environmental restoration problem. This paper presents a framework for selecting appropriate statistical and risk assessment methods. The following points will be made: (1) pathway modelers and risk assessors often recognize that ``some type`` of statistical methods are required but don`t work with statisticians on tools development in the early planning phases of the project; (2) statistical tools selection and development are problem-specific and often site-specific, further indicating a need for up-front involvement of statisticians; and (3) the right tool, applied in the right way can minimize sampling costs, get as much information as possible out of the data that does exist, provide consistency and defensibility for the results, and given structure and quantitative measures to decision risks and uncertainties.

Hassig, N.L.; Gilbert, R.O.; Pulsipher, B.A.

1991-09-01T23:59:59.000Z

363

A framework for evaluating innovative statistical and risk assessment tools to solve environment restoration problems  

Science Conference Proceedings (OSTI)

Environmental restoration activities at the US Department of Energy (DOE) Hanford site face complex issues due to history of varied past contaminant disposal practices. Data collection and analysis required for site characterization, pathway modeling, and remediation selection decisions must deal with inherent uncertainties and unique problems associated with the restoration. A framework for working through the statistical aspects of the site characterization and remediation selection problems is needed. This framework would facilitate the selection of appropriate statistical tools for solving unique aspects of the environmental restoration problem. This paper presents a framework for selecting appropriate statistical and risk assessment methods. The following points will be made: (1) pathway modelers and risk assessors often recognize that some type'' of statistical methods are required but don't work with statisticians on tools development in the early planning phases of the project; (2) statistical tools selection and development are problem-specific and often site-specific, further indicating a need for up-front involvement of statisticians; and (3) the right tool, applied in the right way can minimize sampling costs, get as much information as possible out of the data that does exist, provide consistency and defensibility for the results, and given structure and quantitative measures to decision risks and uncertainties.

Hassig, N.L.; Gilbert, R.O.; Pulsipher, B.A.

1991-09-01T23:59:59.000Z

364

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

365

Environmental Restoration Program waste minimization and pollution prevention self-assessment  

Science Conference Proceedings (OSTI)

The Environmental Restoration (ER) Program within Martin Marietta Energy Systems, Inc. is currently developing a more active waste minimization and pollution prevention program. To determine areas of programmatic improvements within the ER Waste Minimization and Pollution Prevention Awareness Program, the ER Program required an evaluation of the program across the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Paducah Environmental Restoration and Waste Minimization Site, and the Portsmouth Environmental Restoration and Waste Minimization Site. This document presents the status of the overall program as of fourth quarter FY 1994, presents pollution prevention cost avoidance data associated with FY 1994 activities, and identifies areas for improvement. Results of this assessment indicate that the ER Waste Minimization and Pollution Prevention Awareness Program is firmly established and is developing rapidly. Several procedural goals were met in FY 1994 and many of the sites implemented ER waste minimization options. Additional growth is needed, however, for the ER Waste Minimization and Pollution Prevention Awareness Program.

Not Available

1994-10-01T23:59:59.000Z

366

Final report on decommissioning boreholes and wellsite restoration, Gulf Coast Interior Salt Domes of Mississippi  

Science Conference Proceedings (OSTI)

In 1978, eight salt domes in Texas, Louisiana, and Mississippi were identified for study as potential locations for a nuclear waste repository as part of the National Waste Terminal Storage (NWTS) program. Three domes were selected in Mississippi for ``area characterization`` phase study as follows: Lampton Dome near Columbia, Cypress Creek Dome near New Augusta, and Richton Dome near Richton. The purpose of the studies was to acquire geologic and geohydrologic information from shallow and deep drilling investigations to enable selection of sites suitable for more intensive study. Eleven deep well sites were selected for multiple-well installations to acquire information on the lithologic and hydraulic properties of regional aquifers. In 1986, the Gulf Coast salt domes were eliminated from further consideration for repository development by the selection of three candidate sites in other regions of the country. In 1987, well plugging and restoration of these deferred sites became a closeout activity. The primary objectives of this activity are to plug and abandon all wells and boreholes in accordance with state regulations, restore all drilling sites to as near original condition as feasible, and convey to landowners any wells on their property that they choose to maintain. This report describes the activities undertaken to accomplish these objectives, as outlines in Activity Plan 1--2, ``Activity Plan for Well Plugging and Site Restoration of Test Hole Sites in Mississippi.``

Not Available

1989-04-01T23:59:59.000Z

367

Estimating the Value of Electricity Storage Resources in Electricity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Estimating the Value of Electricity Storage Resources in Estimating the Value of Electricity Storage Resources in Electricity Markets - EAC 2011 Estimating the Value of Electricity Storage Resources in Electricity Markets - EAC 2011 The purpose of this report is to assist the U.S. Department of Energy (DOE) in 1) establishing a framework for understanding the role electricity storage resources (storage) can play in wholesale and retail electricity markets, 2) assessing the value of electricity storage in a variety of regions or markets, 3) analyzing current and potential issues that can affect the valuation of storage by investors at the wholesale and retail level, and 4) identifying areas for future research and development for electricity storage technologies and applications. EAC - Estimating the Value of Electricity Storage Resources in Electricity

368

Estimating the Value of Electricity Storage Resources in Electricity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Estimating the Value of Electricity Storage Resources in Estimating the Value of Electricity Storage Resources in Electricity Markets - EAC 2011 Estimating the Value of Electricity Storage Resources in Electricity Markets - EAC 2011 The purpose of this report is to assist the U.S. Department of Energy (DOE) in 1) establishing a framework for understanding the role electricity storage resources (storage) can play in wholesale and retail electricity markets, 2) assessing the value of electricity storage in a variety of regions or markets, 3) analyzing current and potential issues that can affect the valuation of storage by investors at the wholesale and retail level, and 4) identifying areas for future research and development for electricity storage technologies and applications. EAC - Estimating the Value of Electricity Storage Resources in Electricity

369

Frequency tracking and parameter estimation for robust quantum state estimation  

SciTech Connect

In this paper we consider the problem of tracking the state of a quantum system via a continuous weak measurement. If the system Hamiltonian is known precisely, this merely requires integrating the appropriate stochastic master equation. However, even a small error in the assumed Hamiltonian can render this approach useless. The natural answer to this problem is to include the parameters of the Hamiltonian as part of the estimation problem, and the full Bayesian solution to this task provides a state estimate that is robust against uncertainties. However, this approach requires considerable computational overhead. Here we consider a single qubit in which the Hamiltonian contains a single unknown parameter. We show that classical frequency estimation techniques greatly reduce the computational overhead associated with Bayesian estimation and provide accurate estimates for the qubit frequency.

Ralph, Jason F. [Department of Electrical Engineering and Electronics, University of Liverpool, Brownlow Hill, Liverpool L69 3GJ (United Kingdom); Jacobs, Kurt [Department of Physics, University of Massachusetts at Boston, 100 Morrissey Blvd, Boston, Massachusetts 02125 (United States); Hill, Charles D. [Centre for Quantum Computation and Communication Technology, School of Physics, University of Melbourne, Victoria 3010 (Australia)

2011-11-15T23:59:59.000Z

370

prairie restoration  

NLE Websites -- All DOE Office Websites (Extended Search)

History and Introduction In pre-settlement times the State of Illinois included more than 22 million acres of native prairie habitat. Today there is only about 2000 acres of this...

371

Environmental Restoration  

NLE Websites -- All DOE Office Websites (Extended Search)

were dried, mixed, crushed and then aliquots of the soil were dissolved using a potassium fluoride pyrosulfate fusion in which strontium was precipitated as a sulfate. Successive...

372

Non-rigid Registration and Restoration of Double-sided Historical Manuscripts Jie Wang and Chew Lim Tan  

E-Print Network (OSTI)

-sided document images. In IEEE WACV, 2000. [11] A. Tonazzini, L. Bedini, and E. Salerno. Independent com- ponent analysis for document restoration. IJDAR, 7(1):17­ 27, 2004. [12] A. Tonazzini, E. Salerno, and L. Bedini

Tan, Chew Lim

373

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 496: Buried Rocket Site, Antelope Lake, Tonopah Test Range  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) plan details the activities necessary to close Corrective Action Unit 496: Buried Rocket Site, Antelope Lake. CAU 496 consists of one site located at the Tonopah Test Range, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-05-01T23:59:59.000Z

374

Variables Affecting Economic Development of Wind Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Variables Affecting Economic Variables Affecting Economic Development of Wind Energy E. Lantz and S. Tegen National Renewable Energy Laboratory Presented at WINDPOWER 2008 Houston, Texas June 1-4, 2008 Conference Paper NREL/CP-500-43506 July 2008 NREL is operated by Midwest Research Institute â—Ź Battelle Contract No. DE-AC36-99-GO10337 NOTICE The submitted manuscript has been offered by an employee of the Midwest Research Institute (MRI), a contractor of the US Government under Contract No. DE-AC36-99GO10337. Accordingly, the US Government and MRI retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government.

375

1995 Reformulated Gasoline Market Affected Refiners Differently  

Gasoline and Diesel Fuel Update (EIA)

5 Reformulated Gasoline Market Affected 5 Reformulated Gasoline Market Affected Refiners Differently by John Zyren, Charles Dale and Charles Riner Introduction The United States has completed its first summer driving season using reformulated gasoline (RFG). Motorists noticed price increases at the retail level, resulting from the increased cost to produce and deliver the product, as well as from the tight sup- ply/demand balance during the summer. This arti- cle focuses on the costs of producing RFG as experienced by different types of refiners and on how these refiners fared this past summer, given the prices for RFG at the refinery gate. RFG Regulatory Requirements The use of RFG is a result of the Clean Air Act Amendments of 1990 (CAAA). The CAAA cover a wide range of programs aimed at improving air qual-

376

Commercial Building HVAC: How it Affects People  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Building HVAC: How it Affects People Commercial Building HVAC: How it Affects People Speaker(s): William Fisk Date: November 13, 2000 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: David Faulkner Commercial building heating, ventilating, and air conditioning (HVAC) systems are designed primarily to maintain a reasonable level of thermal comfort while limiting first costs and energy consumption. However, research conducted predominately within the last decade suggests that commercial building HVAC significantly influences human outcomes other than thermal comfort, including the health, satisfaction, and work performance of the building's occupants. This presentation will review the relationships of these outcomes with HVAC system type, filtration system efficiency, indoor air temperature, and outside air ventilation rate.

377

Biological restoration of major transportation facilities domestic demonstration and application project (DDAP): technology development at Sandia National Laboratories.  

SciTech Connect

The Bio-Restoration of Major Transportation Facilities Domestic Demonstration and Application Program (DDAP) is a designed to accelerate the restoration of transportation nodes following an attack with a biological warfare agent. This report documents the technology development work done at SNL for this DDAP, which include development of the BROOM tool, an investigation of surface sample collection efficiency, and a flow cytometry study of chlorine dioxide effects on Bacillus anthracis spore viability.

Ramsey, James L., Jr. (.,; .); Melton, Brad; Finley, Patrick; Brockman, John; Peyton, Chad E.; Tucker, Mark David; Einfeld, Wayne; Griffith, Richard O.; Brown, Gary Stephen; Lucero, Daniel A.; Betty, Rita G.; McKenna, Sean Andrew; Knowlton, Robert G.; Ho, Pauline

2006-06-01T23:59:59.000Z

378

Community Resilience: Workshops on Private Sector and Property Owner Requirements for Recovery and Restoration from a Diasaster  

SciTech Connect

This report summarizes the results of a proejct sponsored by DTRA to 1) Assess the readiness of private-sector businesses, building owners, and service providers to restore property and recover operations in the aftermath of a wide-area dispersal of anthrax; and 2) Understand what private property owners and businesses "want and need" from federal, state, and local government to support recovery and restoration from such an incident.

Judd, Kathleen S.; Stein, Steven L.; Lesperance, Ann M.

2008-12-22T23:59:59.000Z

379

A novel control strategy for dynamic voltage restorer using decoupled multiple reference frame PLL (DMRF-PLL)  

Science Conference Proceedings (OSTI)

This paper presents a new control scheme for dynamic voltage restorer (DVR), which consists of a set of series and shunt converters connected back-to-back (BTB), three series transformers, and a dc capacitor installed on the common dc-link. The DVR is ... Keywords: dc capacitor control, decoupled multiple reference frame phase locked loop (DMRF-PLL), dynamic voltage restorer, harmonic and unbalanced voltage compensation, series converters, shunt converters, voltage sag detection

Lin Xu; Yang Han; M. M. Khan; Lidan Zhou; Gang Yao; Chen Chen; Jumin Pan

2009-02-01T23:59:59.000Z

380

Analysis of Cost Estimating Processes Used Within a Concurrent Engineering  

E-Print Network (OSTI)

Concurrent engineering environments affect the cost estimating and engineering capability of an organisation. Cost estimating tools become outdated and need changing in order to reflect the new environment. This is essential, since cost estimating is the start of the cost management process and influences the `go', `no go' decisions concerning a new product development. This paper examines both traditional and more recent developments in order to highlight their advantages and limitations. The analysis includes parametric estimating, feature based costing, artificial intelligence, and cost management techniques. This study was deemed necessary because recent investigations carried out by Cranfield University highlighted that many concurrent engineering companies are not making efficient, wide spread use of existing estimating and cost management tools. In order to promote more efficient use of the discussed estimating processes within the twenty first century, this paper highlights the work of a leading European aerospace manufacturer and their efforts to develop a more seamless estimating environment. Furthermore, a matrix is developed that illustrates particular concurrent engineering environments to which each technique is aptly suited.

Environment Throughout Product; Christopher Rush; Dr. Rajkumar Roy

2000-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Away-from-reactor storage of spent nuclear fuel: factors affecting demand  

SciTech Connect

This report analyzes factors that affect the magnitude and timing of demand for government AFRs, relative to the demand for other storage options, to assist policymakers in predicting this demand. Past predictions of AFT demand range widely and often appear to conflict. This report helps to explain the apparent conflicts among existing demand predictions by demonstrating their sensitivity to changes in key assumptions. Specifically, the report analyzes factors affecting the demand for government AFR storage facilities; illustrates why demand estimates may vary; and identifies actions that may be undertaken by groups, within and outside the government, to influence the level and timing of demands.

Dinneen, P.M.; Solomon, K.A.; Triplett, M.B.

1980-10-01T23:59:59.000Z

382

Occupational dose estimates for a monitored retrievable storage facility  

SciTech Connect

Occupational doses were estimated for radiation workers at the monitored retrievable storage (MRS) facility. This study provides an estimate of the occupational dose based on the current MRS facility design, examines the extent that various design parameters and assumptions affect the dose estimates, and identifies the areas and activities where exposures can be reduced most effectively. Occupational doses were estimated for both the primary storage concept and the alternate storage concept. The dose estimates indicate the annual dose to all radiation workers will be below the 5 rem/yr federal dose equivalent limit. However, the estimated dose to most of the receiving and storage crew (the workers responsible for the receipt, storage, and surveillance of the spent fuel and its subsequent retrieval), to the crane maintenance technicians, and to the cold and remote maintenance technicians is above the design objective of 1 rem/yr. The highest annual dose is received by the riggers (4.7 rem) in the receiving and storage crew. An indication of the extent to which various design parameters and assumptions affect the dose estimates was obtained by changing various design-based assumptions such as work procedures, background dose rates in radiation zones, and the amount of fuel received and stored annually. The study indicated that a combination of remote operations, increased shielding, and additional personnel (for specific jobs) or changes in operating procedures will be necessary to reduce worker doses below 1.0 rem/yr. Operations that could be made at least partially remote include the removal and replacement of the tiedowns, impact limiters, and personnel barriers from the shipping casks and the removal or installation of the inner closure bolts. Reductions of the background dose rates in the receiving/shipping and the transfer/discharge areas may be accomplished with additional shielding.

Harty, R.; Stoetzel, G.A.

1986-06-01T23:59:59.000Z

383

Principal Components Instrumental Variable Estimation  

E-Print Network (OSTI)

. The reason for the inconsistency is that the least squares estimation used for the projection of the first stage tends to fit too well, rendering an overfitted PKX which is still correlated with u if the number of instruments is large. The estimating... -dimensional IVE is just an IVE and as such possesses up to rn?G?2 moments, and thus it may achieve the performance in terms of bias of the ‘no moments’ estimators without displaying their unduly volatility due to fat tails. The fulfilment of condition (A) is key...

Winkelried, Diego; Smith, Richard J.

2011-01-31T23:59:59.000Z

384

Study of Factors Affecting Shrub Establishment on the Monticello...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Study of Factors Affecting Shrub Establishment on the Monticello, Utah, Disposal Cell Cover Study of Factors Affecting Shrub Establishment on the Monticello, Utah, Disposal Cell...

385

Special Provisions Affecting Gas, Water, or Pipeline Companies...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agencies You are here Home Savings Special Provisions Affecting Gas, Water, or Pipeline Companies (South Carolina) Special Provisions Affecting Gas, Water, or Pipeline...

386

Factors affecting the indoor concentrations of carbonaceous aerosols...  

NLE Websites -- All DOE Office Websites (Extended Search)

Factors affecting the indoor concentrations of carbonaceous aerosols of outdoor origin Title Factors affecting the indoor concentrations of carbonaceous aerosols of outdoor origin...

387

EO 13211: Regulations That Significantly Affect Energy Supply...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

211: Regulations That Significantly Affect Energy Supply, Distribution, or Use EO 13211: Regulations That Significantly Affect Energy Supply, Distribution, or Use I am requiring...

388

Exporting licensing regulations affecting US geothermal firms  

DOE Green Energy (OSTI)

This document presents a brief introduction and overview of the Department of Commerce's Export Administration Regulations which might affect potential US geothermal goods exporters. It is intended to make US geothermal firms officials aware of the existence of such regulations and to provide them with references, contacts and phone numbers where they can obtain specific and detailed information and assistance. It must be stressed however, that the ultimate responsibility for complying with the above mentioned regulations lies with the exporter who must consult the complete version of the regulations.

Not Available

1988-08-01T23:59:59.000Z

389

Identifying environmental safety and health requirements for the Fernald Environmental Restoration Management Corporation  

SciTech Connect

This presentation will describe the Fernald Environmental Restoration Management Corporation`s (FERMCO) Standards/Requirements Identification Documents (S/RlDs) Program, the unique process used to implement it, and the status of the program. We will also discuss the lessons learned as the program was implemented. The Department of Energy (DOE) established the Fernald site to produce uranium metals for the nation`s defense programs in 1953. In 1989, DOE suspended production and, in 1991, the mission of the site was formally changed to one of environmental cleanup and restoration. The site was renamed the Fernald Environmental Management Project (FEMP). FERMCO`s mission is to provide safe, early, and least-cost final clean-up of the site in compliance with all regulations and commitments. DOE has managed nuclear facilities primarily through its oversight of Management and Operating contractors. Comprehensive nuclear industry standards were absent when most DOE sites were first established, Management and Operating contractors had to apply existing non-nuclear industry standards and, in many cases, formulate new technical standards. Because it was satisfied with the operation of its facilities, DOE did not incorporate modern practices and standards as they became available. In March 1990, the Defense Nuclear Facilities Safety Board issued Recommendation 90-2, which called for DOE to identify relevant standards and requirements, conduct adequacy assessments of requirements in protecting environmental, public, and worker health and safety, and determine the extent to which the requirements are being implemented. The Environmental Restoration and Waste Management Office of DOE embraced the recommendation for facilities under its control. Strict accountability requirements made it essential that FERMCO and DOE clearly identify applicable requirements necessary, determine the requirements` adequacy, and assess FERMCO`s level of compliance.

Beckman, W.H.; Cossel, S.C.; Alhadeff, N. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project; Porco, D.J. [Dept. of Energy, Fernald, OH (United States); Lindamood, S.B. [Jacobs Engineering, Augusta, GA (United States); Beers, J.A. [Fluor Daniel Corp., Golden, CO (United States)

1994-01-14T23:59:59.000Z

390

Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

Not Available

1993-01-15T23:59:59.000Z

391

Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 1, Introduction  

SciTech Connect

As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization`s objectives, inherent data relationships and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production.

Not Available

1994-09-01T23:59:59.000Z

392

The In Situ Vitrification Integrated Program: Focusing an innovative solution on environmental restoration needs  

Science Conference Proceedings (OSTI)

The objective of the In Situ Vitrification (ISV) Integrated Program is to ensure that ISV is a viable alternative for DOE environmental restoration applications. The program focuses ISV development activities upon DOE-wide environmental remediation needs and resolves issues inhibiting timely implementation on DOE sites. currently the ISV Integrated Program is focused on contaminated soil sites but is also resolving some key issues that are common to soils and to potential future applications such as buried waste and underground structures. This paper describes the status and current focus of the ISV Integrated Program.

Buelt, J.L.; Thompson, L.E.

1992-08-01T23:59:59.000Z

393

A systematic approach to evaluate erosion potential at environmental restoration sites  

Science Conference Proceedings (OSTI)

The Environmental Restoration (ER) Project at the Los Alamos National Laboratory (LANL) is responsible for investigation and remediation of solid waste management units (SWMUs) under the Resource Conservation and Recovery Act and area of concerns (AOCs) under the direction of the Department of Energy. During the investigation and remediation phases, information may be gathered that indicates that conditions may be present at the site which may effect surface water quality. Depending on the constituent found, its concentration, and erosion/sediment transport potential, it may be necessary to implement temporary or permanent mitigative measures.

Veenis, S.J.; Mays, D.C. [Merrick and Co., Los Alamos, NM (United States)

1998-12-01T23:59:59.000Z

394

Environmental restoration at the Pantex Plant. Quarterly progress report, April 12, 1995--June 30, 1995  

Science Conference Proceedings (OSTI)

This report summarizes the Work Plans for activities associated with Environmental Restoration of the perched aquifer and contaminated soils at the Pantex Plant. The Higher Education Consortium/Pantex Research Laboratory is participating in the Consortium Grant to evaluate subsurface remediation alternatives for the perched aquifer at the Pantex Plant. Research activities will develop site characterization data and evaluate remediation alternatives for the perched aquifer and the overlying vadose zone. The work plans cover research activities for the remainder of FY95, and proposed activities for FY96 and thereafter. A separate document will present more detailed plans for FY96 activities and budget requirements.

Charbeneau, R.J.

1995-06-19T23:59:59.000Z

395

Strategic plan strategy of the Oak Ridge National Laboratory Environmental Restoration Program  

SciTech Connect

This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below.

1995-06-01T23:59:59.000Z

396

Appalachian Rivers II Conference: Technology for Monitoring, Assessing, and Restoring Streams, Rivers, and Watersheds  

SciTech Connect

On July 28-29, 1999, the Federal Energy Technology Center (FETC) and the WMAC Foundation co-sponsored the Appalachian Rivers II Conference in Morgantown, West Virginia. This meeting brought together over 100 manufacturers, researchers, academicians, government agency representatives, watershed stewards, and administrators to examine technologies related to watershed assessment, monitoring, and restoration. Sessions included presentations and panel discussions concerning watershed analysis and modeling, decision-making considerations, and emerging technologies. The final session examined remediation and mitigation technologies to expedite the preservation of watershed ecosystems.

None available

1999-07-29T23:59:59.000Z

397

Estimation of Surface Heat Flux  

Science Conference Proceedings (OSTI)

The authors reconsider the problem of estimating the sensible heat transfer at the earth's surface from direct measurements of turbulent fluxes in the atmospheric boundary layer. For simplicity, only horizontally homogeneous conditions are ...

Jielun Sun; Steven K. Esbensen; L. Mahrt

1995-09-01T23:59:59.000Z

398

Estimation of resources and reserves  

E-Print Network (OSTI)

This report analyzes the economics of resource and reserve estimation. Current concern about energy problems has focused attention on how we measure available energy resources. One reads that we have an eight-year oil ...

Massachusetts Institute of Technology. Energy Laboratory.

1982-01-01T23:59:59.000Z

399

Identifying Socio-ecological Factors Influencing the Use of Prescribed Fire to Maintain and Restore Ecosystem Health in Texas, USA and Northern Chihuahua, Mexico  

E-Print Network (OSTI)

There is a critical need for more studies to identify socio-ecological drivers that affect conservation and management of fire adapted ecosystems, yet studies that identify such variables and explore their interaction in specific systems are not only scarce but limited to only a few systems. Although information on the socio-ecological effects of prescribed fire application exists, there is no integrative framework that simultaneously considers the interplay between social and ecological factors affecting the use of prescribed fires. Fire suppression, together with other human and natural disturbances in grassland systems that are adapted to episodic fire, are the major factors that have contributed to the recruitment of woody species into grasslands worldwide. Even though the ecology of restoring these fire prone systems back to a grassland state is becoming clearer, the major hurdle to reintroducing historic fire at a landscape scale is its social acceptability. To address these deficiencies, I studied the socio-ecological factors influencing the use of prescribed fire in Texas, USA and Chihuahua, Mexico using a combination of quantitative and qualitative approaches to examine how social and ecological factors affect ecosystem conservation and management of semi-arid grassland systems. For the Texas case study I used quantitative survey data analyzed using logistic regression models and structural equation models. For the Mexico case study I used qualitative interviews gathered using a snowball network sampling approach and coded them based on the analytic themes of land cover change, institutional failure, market drivers, and population dynamics. Results from the Texas case study suggest that risk taking orientation and especially, perceived support from others when implementing prescribed burns, play important roles in determining attitudes towards the use of high-intensity prescribed fires, which are sometimes needed to restore ecosystems. Results from the Texas case study also highlight how membership in Prescribed Burn Associations (PBAs) influence land manager decisions regarding the use of prescribed fire by reducing concerns over lack of skills, knowledge and resources. Results emphasize the potential for PBAs to reduce risk concerns regarding the application of prescribed fire and are relevant to management of brush encroached areas. Through PBAs, effective landscape-scale solutions to the brush encroachment problem can be achieved in Texas. Results from the Mexico case study show how fire stopped effectively being a driving factor on this system decades ago. Socio-political and ecological changes at the national, and international level produced changes in land use disrupting historical fire patterns and contributing to the ecological deterioration of the area. Droughts combined with poor management practices have depleted the fuel needed to carry a fire. Landowners also face safety and legal concerns but in most cases, even if a landowner decided to implement a prescribed burn, an ecological threshold has been crossed and current fine fuel loads (grass) are insufficient to carry a fire that is sufficiently intense to reduce brush cover and restore grassland and savanna ecosystems. Based on my findings I can conclude that ecologically sound adaptive management and social capital are fundamental components of the livelihoods of landowners and land managers in both case studies. Work and investment that is focused on strengthening this social capital will have the most profound effects in maintaining the integrity of grassland systems at a landscape scale.

Toledo, David

2013-05-01T23:59:59.000Z

400

Does Daylight Savings Time Affect Traffic Accidents?  

E-Print Network (OSTI)

This paper studies the effect of changes in accident pattern due to Daylight Savings Time (DST). The extension of the DST in 2007 provides a natural experiment to determine whether the number of traffic accidents is affected by shifts in hours of daylight using the year as control group. Using data on traffic accidents in Texas based on crash reports provided by the Texas Transportation Institute, and a difference in differences technique, this study creates a regression model to determine how significant this factor is in affecting traffic accident patterns as observed in the data. Results show that DST has no statistically significant effect on traffic accidents of all categories including (but not limited to) highway, non-highway, and accidents, accidents with injuries and no injuries, and accidents by drivers of all age-groups. This implies that the federal government’s policy of DST (and its extension) has no costs incurred by a rise in motor vehicle crashes when it gets dark early.

Deen, Sophia 1988-

2012-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Quantum estimation of relative information  

E-Print Network (OSTI)

We derive optimal schemes for preparation and estimation of relational degrees of freedom between two quantum systems. We specifically analyze the case of rotation parameters representing relative angles between elements of the SU(2) symmetry group. Our estimation procedure does not assume prior knowledge of the absolute spatial orientation of the systems and as such does not require information on the underlying classical reference frame in which the states are prepared.

Netanel H. Lindner; Petra F. Scudo; Dagmar Bruss

2005-06-27T23:59:59.000Z

402

PDV Uncertainty Estimation & Methods Comparison  

Science Conference Proceedings (OSTI)

Several methods are presented for estimating the rapidly changing instantaneous frequency of a time varying signal that is contaminated by measurement noise. Useful a posteriori error estimates for several methods are verified numerically through Monte Carlo simulation. However, given the sampling rates of modern digitizers, sub-nanosecond variations in velocity are shown to be reliably measurable in most (but not all) cases. Results support the hypothesis that in many PDV regimes of interest, sub-nanosecond resolution can be achieved.

Machorro, E.

2011-11-01T23:59:59.000Z

403

Estimate product quality with ANNs  

Science Conference Proceedings (OSTI)

Artificial neural networks (ANNs) have been applied to predict catalytic reformer octane number (ON) and gasoline splitter product qualities. Results show that ANNs are a valuable tool to derive fast and accurate product quality measurements, and offer a low-cost alternative to online analyzers or rigorous mathematical models. The paper describes product quality measurements, artificial neural networks, ANN structure, estimating gasoline octane numbers, and estimating naphtha splitter product qualities.

Brambilla, A. [Univ. of Pisa (Italy); Trivella, F. [Adicon Advanced Distillation Control SrL, Pisa (Italy)

1996-09-01T23:59:59.000Z

404

DOE G 430.1-1 Chp 15, Estimating Methods  

Directives, Delegations, and Requirements

Estimating methods, estimating indirect and direct costs, and other estimating considerations are discussed in this chapter.

1997-03-28T23:59:59.000Z

405

Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee  

SciTech Connect

This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

1995-11-01T23:59:59.000Z

406

Proceedings of Workshop on Uranium Production Environmental Restoration: An exchange between the United States and Germany  

SciTech Connect

Scientists, engineers, elected officials, and industry regulators from the United, States and Germany met in Albuquerque, New Mexico, August 16--20, 1993, in the first joint international workshop to discuss uranium tailings remediation. Entitled ``Workshop on Uranium Production Environmental Restoration: An Exchange between the US and Germany,`` the meeting was hosted by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The goal of the workshop was to further understanding and communication on the uranium tailings cleanup projects in the US and Germany. Many communities around the world are faced with an environmental legacy -- enormous quantities of hazardous and low-level radioactive materials from the production of uranium used for energy and nuclear weapons. In 1978, the US Congress passed the Uranium Mill Tailings Radiation Control Act. Title I of the law established a program to assess the tailings at inactive uranium processing sites and provide a means for joint federal and state funding of the cleanup efforts at sites where all or substantially all of the uranium was produced for sale to a federal agency. The UMTRA Project is responsible for the cleanup of 24 sites in 10 states. Germany is facing nearly identical uranium cleanup problems and has established a cleanup project. At the workshop, participants had an opportunity to interact with a broad cross section of the environmental restoration and waste disposal community, discuss common concerns and problems, and develop a broader understanding of the issues. Abstracts are catalogued individually for the data base.

Not Available

1993-12-31T23:59:59.000Z

407

Energy Security and Restoration Exercise Program/Best Practices and Information Sharing  

Science Conference Proceedings (OSTI)

The first year of this cooperative agreement focused on the following elements: curriculum development and presentation, curriculum maintenance, enhancements, and effectiveness, and smart card initiative. During the second year of this grant, with redirection from DOE, the IUOE modified its mission statement under the cooperative agreement. It states: 'The mission of the IUOE is to provide expertise to provide best practices, information sharing, and develop scenarios and conduct exercises ranging in size and complexity from table top to national level to prepare all stakeholders to protect and restore energy infrastructure should an event, terrorist or natural, occur'. The Program developed a number of products under this Cooperative Agreement. These products include: FOSTER (Facility Operations Safety Training Event Response) Curriculum and Training Models, Alternative Energy Supply - Generators Training Module, Liquefied Natural Gas Training Module, Education Program - Distributed Generations, Compendium of Resources and References, Energy Security and Restoration Training Manual, Manual of Situations and Scenarios Developed for Emergency Exercises, Manual of Best Practices/Lessons Learned for Energy Load Management, Training Plan, Strategic Information and Exercise Plan, National Certification Plan Report, and a Smart Card Project Report.

Barbara McCabe; John Kovach

2009-03-30T23:59:59.000Z

408

Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.  

SciTech Connect

In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

Tillman, Jack B.

2008-09-01T23:59:59.000Z

409

Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement  

Science Conference Proceedings (OSTI)

In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

Not Available

1994-01-01T23:59:59.000Z

410

A Bayesian Framework for Combining Valuation Estimates  

E-Print Network (OSTI)

Obtaining more accurate equity value estimates is the starting point for stock selection, value-based indexing in a noisy market, and beating benchmark indices through tactical style rotation. Unfortunately, discounted cash flow, method of comparables, and fundamental analysis typically yield discrepant valuation estimates. Moreover, the valuation estimates typically disagree with market price. Can one form a superior valuation estimate by averaging over the individual estimates, including market price? This article suggests a Bayesian framework for combining two or more estimates into a superior valuation estimate. The framework justifies the common practice of averaging over several estimates to arrive at a final point estimate.

Kenton K. Yee

2007-07-24T23:59:59.000Z

411

A Study of the Error Covariance Matrix of Radar Rainfall Estimates in Stratiform Rain. Part II: Scale Dependence  

Science Conference Proceedings (OSTI)

The contribution of various physical sources of uncertainty affecting radar rainfall estimates at the ground has been recently quantified at a resolution typically used in schemes assimilating rainfall at the ground onto mesoscale models. Here, ...

Marc Berenguer; Isztar Zawadzki

2009-06-01T23:59:59.000Z

412

Density estimation for data with rounding errors  

Science Conference Proceedings (OSTI)

Rounding of data is common in practice. The problem of estimating the underlying density function based on data with rounding errors is addressed. A parametric maximum likelihood estimator and a nonparametric bootstrap kernel density estimator are proposed. ... Keywords: Bootstrapping, Deconvolution density estimation, Fast Fourier transformation, Kernel density estimation, Measurement error

B. Wang, W. Wertelecki

2013-09-01T23:59:59.000Z

413

James-Stein type estimators of variances  

Science Conference Proceedings (OSTI)

In this paper we propose James-Stein type estimators for variances raised to a fixed power by shrinking individual variance estimators towards the arithmetic mean. We derive and estimate the optimal choices of shrinkage parameters under both the squared ... Keywords: 62H12, Inadmissibility, Shrinkage estimation, Shrinkage parameter, Squared loss function, Stein loss function, Variance estimation

Tiejun Tong; Homin Jang; Yuedong Wang

2012-05-01T23:59:59.000Z

414

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

415

Light management for landscape restoration| Suppression of a model weedy light-demanding pioneer shrub, Ulex europaeus on Mauna Kea Hawai`i.  

E-Print Network (OSTI)

?? The use of planted forests as a restoration tool has been shown to improve landscape health and may control invasive plant species by canopy… (more)

Perry, Cheyenne Hiapo

2011-01-01T23:59:59.000Z

416

An Analysis of Restorative Justice in Vermont: Assessing the Relationships Between the Attitudes of Citizens and the Practices of the Department of Corrections.  

E-Print Network (OSTI)

??The purpose of this study was to examine the relationship between the attitudes of citizens in Vermont and the newly instated restorative justice programs of… (more)

Melbardis, Dustin Robert

2012-01-01T23:59:59.000Z

417

Environmental restoration/waste management-applied technology semiannual report, January--June 1992. Volume 1, No. 1  

SciTech Connect

This is the first issue from the Lawrence Livermore National Laboratory of The Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Semiannual Report, a continuation of the Advanced Processing Technology (APT) Semiannual Report. The name change reflects the consolidation of the APT Program with the Environmental Restoration and Waste Management Program to form the Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Program. The Livermore site mirrors, on a small scale, many of the environmental and waste management problems of the DOE Complex. The six articles in this issue cover incineration- alternative technologies, process development for waste minimization, the proposed Mixed Waste Management Facility, dynamic underground stripping, electrical resistance tomography, and Raman spectroscopy for remote characterization of underground tanks.

Adamson, M.; Kline-Simon, K. [eds.

1992-12-31T23:59:59.000Z

418

Cost-Efficacy of Wetland Preservation and Restoration in Coastal Louisiana.  

E-Print Network (OSTI)

??Louisiana faces a tremendous crisis of coastal wetland loss, where an estimated 1,900 square miles of coastal land has been lost in the past century.… (more)

Aust, Christiane

2006-01-01T23:59:59.000Z

419

Summary of operations and performance of the Murdock site restoration project in 2007.  

SciTech Connect

This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief videorecording of the trees in high-wind conditions is on the compact disc (CD) inside the back cover of this document.

LaFreniere, L. M.; Environmental Science Division

2008-06-03T23:59:59.000Z

420

BLE: Battery Life Estimator | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Life Estimator (BLE) software is a state-of-the-art tool kit for fitting battery aging data and for battery life estimation. It was designed to make life-cycle estimates...

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

The Oncor Geodatabase for the Columbia Estuary Ecosystem Restoration Program: Handbook of Data Reduction Procedures, Workbooks, and Exchange Templates  

SciTech Connect

This Handbook of Data Reduction Procedures, Workbooks, and Exchange Templates is designed to support the Oncor geodatabase for the Columbia Estuary Ecosystem Restoration Program (CEERP). The following data categories are covered: water-surface elevation and temperature, sediment accretion rate, photo points, herbaceous wetland vegetation cover, tree plots and site summaries, fish catch and density, fish size, fish diet, fish prey, and Chinook salmon genetic stock identification. The handbook is intended for use by scientists collecting monitoring and research data for the CEERP. The ultimate goal of Oncor is to provide quality, easily accessible, geospatial data for synthesis and evaluation of the collective performance of CEERP ecosystem restoration actions at a program scale.

Sather, Nichole K.; Borde, Amy B.; Diefenderfer, Heida L.; Serkowski, John A.; Coleman, Andre M.; Johnson, Gary E.

2013-12-31T23:59:59.000Z

422

Practical Estimates of Lake Evaporation  

Science Conference Proceedings (OSTI)

Practical estimates of lake evaporation must rely on data that can be observed in the land environment. This requires the ability to take into account the changes in the temperature and humidity that occur when the air passes from the land to the ...

F. I. Morton

1986-03-01T23:59:59.000Z

423

An Improved Cluster Richness Estimator  

Science Conference Proceedings (OSTI)

Minimizing the scatter between cluster mass and accessible observables is an important goal for cluster cosmology. In this work, we introduce a new matched filter richness estimator, and test its performance using the maxBCG cluster catalog. Our new estimator significantly reduces the variance in the L{sub X}-richness relation, from {sigma}{sub lnL{sub X}}{sup 2} = (0.86 {+-} 0.02){sup 2} to {sigma}{sub lnL{sub X}}{sup 2} = (0.69 {+-} 0.02){sup 2}. Relative to the maxBCG richness estimate, it also removes the strong redshift dependence of the richness scaling relations, and is significantly more robust to photometric and redshift errors. These improvements are largely due to our more sophisticated treatment of galaxy color data. We also demonstrate the scatter in the L{sub X}-richness relation depends on the aperture used to estimate cluster richness, and introduce a novel approach for optimizing said aperture which can be easily generalized to other mass tracers.

Rozo, Eduardo; /Ohio State U.; Rykoff, Eli S.; /UC, Santa Barbara; Koester, Benjamin P.; /Chicago U. /KICP, Chicago; McKay, Timothy; /Michigan U.; Hao, Jiangang; /Michigan U.; Evrard, August; /Michigan U.; Wechsler, Risa H.; /SLAC; Hansen, Sarah; /Chicago U. /KICP, Chicago; Sheldon, Erin; /New York U.; Johnston, David; /Houston U.; Becker, Matthew R.; /Chicago U. /KICP, Chicago; Annis, James T.; /Fermilab; Bleem, Lindsey; /Chicago U.; Scranton, Ryan; /Pittsburgh U.

2009-08-03T23:59:59.000Z

424

Periodicity estimation of Dynamic Textures  

Science Conference Proceedings (OSTI)

Dynamic Textures (DTs) are image sequences of natural events like fire, smoke, water etc., that possesses regular motion patterns. Periodicity is a widely used tool to analyse regular structures of periodic one dimensional signals as well as two dimensional ... Keywords: co-occurrence matrix, dynamic textures, image sequences, image texture analysis, motion patterns, natural events, periodicity estimation, temporal textures

Khalid Zaman Bijon; Ahmed Hasan; Ashfaqur Rahman; Manzur Murshed

2008-03-01T23:59:59.000Z

425

Unsupervised clustering and centroid estimation using dynamic ...  

Science Conference Proceedings (OSTI)

solving cluster detection and centroid estimation prob- lems. ... density function and these vectors estimate the cen- ..... an algorithm to minimize a cost function.

426

Estimating Waste Inventory and Waste Tank Characterization |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Estimating Waste Inventory and Waste Tank Characterization Estimating Waste Inventory and Waste Tank Characterization Summary Notes from 28 May 2008 Generic Technical Issue...

427

Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Workers Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint RICHLAND, Wash. - The Hanford Site is looking greener these days after American Recovery and Reinvestment Act workers revegetated 166 acres across 12 waste sites, planting over 1,100 pounds of seeds and about 280,000 pounds of mulch. The largest of the sites, known as the BC Control Area, is an approximately 13-square-mile area associated with a waste disposal system used during Hanford operations. Recovery Act workers remediated and reseeded a densely contaminated 140- acre portion of that area after disposing of more than 370,000 tons of contaminated soil. Recovery Act workers employed by DOE contractor CH2M HILL Plateau Remediation Company have remediated 61 waste sites,

428

Audit of Fuel Processing Restoration Property, WR-B-96-04  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FUEL PROCESSING FUEL PROCESSING RESTORATION PROPERTY The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov U.S. Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/refshelf.html Your comments would be appreciated and can be provided on the Customer Response Form attached to the report. This report can be obtained from the U.S. Department of Energy

429

Pinellas Environmental Restoration Project Quarterly Progress Report, 4.5 Acre January through March 2004  

Office of Legacy Management (LM)

January through March 2004 January through March 2004 April 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management DOE LM/ 645 2004 GJ - - N0074500 DOE-LM/GJ645-2004 Pinellas Environmental Restoration Project Quarterly Progress Report 4.5 Acre Site January through March 2004 April 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado Document Number N0074500 Contents U.S. Department of Energy 4.5 Acre Site Quarterly Progress Report

430

Livermore, Los Alamos Team for Artificial Retina Project to Help Restore Vision for Many  

NLE Websites -- All DOE Office Websites (Extended Search)

9 9 6 www.federallabs.org Livermore, Los Alamos Team for Artificial Retina Project to Help Restore Vision for Many signals in the eye that the brain uses to create a visual image. As a core member of the team, Los Alamos National Laboratory is developing and applying techniques for the functional imaging of physiological and prosthetic stimulation in neural tissue to characterize information encoding and processing by the retina and to validate the efficacy of electrical stimulation. Coupled experimental studies and computer simulations are being used to investigate the biophysical and physiological properties of retinal neuronal tissue. In clinical trials, patients with vision loss were able to successfully identify objects, increase mobility, and

431

S M Stoller Pinellas Environmental Restoration Project - Young - Rainey Star Center  

Office of Legacy Management (LM)

6/06 6/06 Technical Report for S M Stoller Pinellas Environmental Restoration Project - Young - Rainey Star Center 110406202 Accutest Job Number: F43553 Sampling Date: 09/07/06 Report to: U.S. Dept of Energy, Grand Jct Office 2597 B 3/4 Road Grand Juction, CO 81503 ATTN: Contracts Department, PO# 24231 x Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference

432

ORNLIRASA-95117 LIFE SCIENCES DIVISION Environmental Restoration and Waste Management Non-Defense Programs  

Office of Legacy Management (LM)

95117 95117 LIFE SCIENCES DIVISION Environmental Restoration and Waste Management Non-Defense Programs (Activity No. EX 20 20 01 0; ADS1310AA) Results of the Independent Radiological Verification Survey at the Former Chapman Valve Manufacturing Company, Indian Orchard, Massachusetts (cIooo1v) R. E. Rodriguez and C. A. Johnson Date issued -May 1997 Investigation Team R. D. Foley-Measurement Applications and Development Manager M. E. Murray-FUSRAP Project Director R. E. Rodriguez-Field Survey Team Leader Survey Team Members R. C. Gosslee V. P. Patania R. E. Rodriguez Work performed by the Measurement Applications and Development Group Prepared by the OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831-6285 managed by LOCKHEED MARTIN ENERGY RESEARCH CORP.

433

Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

United States. Bonneville Power Administration

1994-10-01T23:59:59.000Z

434

Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993  

SciTech Connect

The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

1993-03-01T23:59:59.000Z

435

The pi -> pi pi process in nuclei and the restoration of chiral symmetry  

E-Print Network (OSTI)

The results of an extensive campaign of measurements of the pi -> pi pi process in the nucleon and nuclei at intermediate energies are presented. The measurements were motivated by the study of strong pi pi correlations in nuclei. The analysis relies on the composite ratio C_{pi pi}^A, which accounts for the clear effect of the nuclear medium on the (pi pi) system. The comparison of the C_{pi pi}^A distributions for the (pi pi)_{I=J=0} and (pi pi)_{I=0,J=2} systems to the model predictions indicates that the C_{pi pi}^A behavior in proximity of the 2m_pi threshold is explainable through the partial restoration of chiral symmetry in nuclei.

N. Grion; M. Bregant; P. Camerini; E. Fragiacomo; S. Piano; R. Rui; E. F. Gibson; G. Hofman; E. L. Mathie; R. Meier; M. E. Sevior; G. R. Smith; R. Tacik; for the CHAOS Collaboration

2005-08-24T23:59:59.000Z

436

Health and safety plan for operations performed for the Environmental Restoration Program  

SciTech Connect

This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

1992-04-01T23:59:59.000Z

437

TSD capacity model interface with waste reduction planning in the Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This report provides a picture of how the integration of waste generation forecasting with treatment, storage, and disposal (TSD) capacity modeling interfaces with waste reduction planning in the Environmental Restoration Program. Background information is given for the major activities at the seven Martin Marietta Energy Systems, Inc., sites: (1) Oak Ridge National Laboratory; (2) Oak Ridge Y-12 Plant; (3) Oak Ridge K-25 Site; (4) Paducah Gaseous Diffusion Plant; (5) Portsmouth Gaseous Diffusion Plant; (6) Oak Ridge Associated Universities; and (7) the off-site contaminated areas near DOE facilities. A perspective is provided for strategies to achieve waste reduction, how waste generation forecasts rates were developed, and how those forecasted waste generation rates will be used in TSD capacity modeling. The generation forecasting in combination with TSD modeling allows development of quantifiable goals and subsequent waste reduction. 2 figs.

Phifer, B.E. Jr.; Grumski, J.T.

1991-01-01T23:59:59.000Z

438

Environmental management 1994. Progress and plans of the environmental restoration and waste management program  

SciTech Connect

The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

Not Available

1994-02-01T23:59:59.000Z

439

H. R. 2223: Oil Spill Resource Restoration Act. Introduced in the House of Representatives, One Hundred First Congress, First Session, May 3, 1989  

Science Conference Proceedings (OSTI)

H.R. 2223 would provide for expedited assessment of damages from major oil spills, and would amend the Internal Revenue Code of 1986 to disallow deduction of the costs for cleanup of oil or hazardous substance discharges. Upon receiving a petition for expedited preliminary damage, the administrator would immediately initiate an assessment of the damages to natural resources. Within 20 days if it is found to be a major spill, the administrator designates trustees for overseeing both Federal and state natural resources that are affected, establishes a commission of these trustees, makes a determination regarding the party responsible for the spill, and directs that party to establish a trust fund accessible to the commission in an amount determined to be adequate to pay reasonable costs incurred by the commission for a full assessment of the damages and for preparing a restoration and replacement plan. Deductions for cleanup of spills would be allowed only if it can be certified that the taxpayer made good faith efforts to comply with the Clean Water Act for oil spills or with the Comprehensive Environmental Response, Compensation, and Liability Act for hazardous substances spills or if it can be proved that the spill was caused by an act of God, and act of war, negligence on the part of the US government, or an act of omission of a third party. The bill would be applicable to spills occurring after March 23, 1989.

Not Available

1989-01-01T23:59:59.000Z

440

Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.  

DOE Green Energy (OSTI)

The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions favorable for a fish parasite, Heteropolaria lwoffi. Educational activities further the likelihood that future generations will continue to understand and enjoy the presence of native fish stocks in the Wind River basin.

White, Jim

2004-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "affected restoration estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory  

SciTech Connect

This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

1994-08-01T23:59:59.000Z

442

Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)  

Science Conference Proceedings (OSTI)

The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: {sm_bullet} Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) {sm_bullet} Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as {open_quotes}low{close_quotes} hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with {open_quotes}moderate{close_quotes} or {open_quotes}high{close_quotes} hazard classifications.

NONE

1995-09-01T23:59:59.000Z

443

GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GAO Cost Estimating and Assessment Guide GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process Step Description Associated task 1 Define estimate's purpose Determine estimate's purpose, required level of detail, and overall scope; Determine who will receive the estimate 2 Develop estimating plan Determine the cost estimating team and develop its master schedule; Determine who will do the independent cost estimate; Outline the cost estimating approach; Develop the estimate timeline 3 Define program characteristics In a technical baseline description document, identify the program's

444