Powered by Deep Web Technologies
Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Environmental Impact  

U.S. Energy Information Administration (EIA)

Environmental Impact - a single comprehensive bibliographic information resource on climate change & other impacts of humans on the biosphere.

2

Environmental impact report (draft)  

DOE Green Energy (OSTI)

The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

Not Available

1980-05-01T23:59:59.000Z

3

Secretary Chu Announces Determination of No Adverse Material Impact for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination of No Adverse Material Impact Determination of No Adverse Material Impact for Uranium Transfer to Fund Portsmouth Cleanup Secretary Chu Announces Determination of No Adverse Material Impact for Uranium Transfer to Fund Portsmouth Cleanup November 12, 2009 - 12:00am Addthis WASHINGTON, D.C. - Secretary Chu announced today that the Department of Energy has issued a final determination and market impact study for the proposed uranium transfer to fund accelerated cleanup activities at the Portsmouth Site in Piketon, Ohio, which will create between 800 to 1,000 new jobs for the community. The market review and determination confirms that the proposed transfer of uranium will not have an adverse material impact on the domestic uranium industries. Under the determination, DOE's Office of Environmental Management will be

4

Secretary Chu Announces Determination of No Adverse Material Impact for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary Chu Announces Determination of No Adverse Material Impact Secretary Chu Announces Determination of No Adverse Material Impact for Uranium Transfer to Fund Portsmouth Cleanup Secretary Chu Announces Determination of No Adverse Material Impact for Uranium Transfer to Fund Portsmouth Cleanup November 12, 2009 - 12:00am Addthis WASHINGTON, D.C. - Secretary Chu announced today that the Department of Energy has issued a final determination and market impact study for the proposed uranium transfer to fund accelerated cleanup activities at the Portsmouth Site in Piketon, Ohio, which will create between 800 to 1,000 new jobs for the community. The market review and determination confirms that the proposed transfer of uranium will not have an adverse material impact on the domestic uranium industries. Under the determination, DOE's Office of Environmental Management will be

5

Secretary Chu Announces Determination of No Adverse Material Impact for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 12, 2009 - 1:17pm November 12, 2009 - 1:17pm Addthis Secretary Chu announced today that the Department of Energy has issued a final determination and market impact study for the proposed uranium transfer to fund accelerated cleanup activities at the Portsmouth Site in Piketon, Ohio, which will create between 800 to 1,000 new jobs for the community. The market review and determination confirms that the proposed transfer of uranium will not have an adverse material impact on the domestic uranium industries. Under the determination, DOE's Office of Environmental Management will be able to transfer as much as 300 metric tons of uranium per quarter in calendar years 2009 and 2010 for cleanup at the Portsmouth Gaseous Diffusion Plant, so long as the total transfer during that period does not

6

Environmental Impacts of Repository  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~~"'"""""""""'l.. _ _ 4 Environmental Impacts of Repository Construction, Operation and Monitoring, and Closure 4-iii Environmental Impacts of Repository Construction, Operations, Monitoring, and Closure TABLE OF CONTENTS Section Page 4. Environmental Impacts of Repository Construction, Operations, Monitoring, and Closure ..............4-1 4.1 Preclosure Environmental Impacts of Construction, Operations, Monitoring, and Closure of a Repository ...............................................................................................................................4-3 4.1.1 Impacts to Land Use and Ownership .......................................................................................4-4

7

Secretary Chu Announces Determination of No Adverse Material Impact for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination of No Adverse Material Impact Determination of No Adverse Material Impact for Uranium Transfer to Fund Portsmouth Cleanup Secretary Chu Announces Determination of No Adverse Material Impact for Uranium Transfer to Fund Portsmouth Cleanup March 2, 2011 - 12:00am Addthis WASHINGTON, D.C. - Secretary of Energy Steven Chu announced today that the Department of Energy has issued a determination and market impact analysis authorizing uranium transfers to fund accelerated cleanup activities at the Portsmouth Site in Piketon, Ohio, through the third quarter of calendar year 2013. The Determination finds that the proposed transfer of uranium will not have an adverse material impact on the domestic uranium industries. The determination authorizes the Department to conduct transfers on a quarterly basis, with no more than 450 metric tons (MTU) of natural uranium

8

Secretary Chu Announces Determination of No Adverse Material Impact for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination of No Adverse Material Impact Determination of No Adverse Material Impact for Uranium Transfer to Fund Portsmouth Cleanup Secretary Chu Announces Determination of No Adverse Material Impact for Uranium Transfer to Fund Portsmouth Cleanup March 2, 2012 - 4:30pm Addthis WASHINGTON, D.C. - Secretary of Energy Steven Chu announced today that the Department of Energy has issued a determination and market impact analysis authorizing uranium transfers to fund accelerated cleanup activities at the Portsmouth Site in Piketon, Ohio, through the third quarter of calendar year 2013. The Determination finds that the proposed transfer of uranium will not have an adverse material impact on the domestic uranium industries. The determination authorizes the Department to conduct transfers on a quarterly basis, with no more than 450 metric tons (MTU) of natural uranium

9

Technical Evaluation of the Utility of Intake Approach Velocity as an Indicator of Potential Adverse Environmental Impact under Clea n Water Act Section 316(b)  

Science Conference Proceedings (OSTI)

This report addresses issues related to causes of fish impingement at cooling water intake structures (CWISs), specifically the relationship of water velocity, site geometry, fish swimming ability, and environmental conditions. CWIS approach velocity is central to the ongoing U.S. Environmental Protection Agency (EPA) effort to regulate CWISs under Section 316(b) of the Clean Water Act. Energy producers, federal and state resource agencies and regulators, and the public will find this report a valuable r...

2000-12-18T23:59:59.000Z

10

FAQ 42-What are the potential environmental impacts from disposal...  

NLE Websites -- All DOE Office Websites (Extended Search)

disposal of depleted uranium as an oxide? What are the potential environmental impacts from disposal of depleted uranium as an oxide? Disposal as oxide could result in adverse...

11

FAQ 40-What are the potential environmental impacts from storage...  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental impacts from storage of depleted uranium as an oxide? Storage as an oxide could result in potential adverse impacts to air, water, and soil quality as a result of...

12

Environmental Impact | Browse Tree Results  

U.S. Energy Information Administration (EIA)

Environmental Impact. From climate change to biodiversity loss - documenting man's impact. CAB International. Home. Abstracts Database. News Articles. ...

13

Environmental impacts of renewable energy sources  

Science Conference Proceedings (OSTI)

The global attention has always been focused on the adverse environmental impacts of conventional energy sources. In contrast nonconventional energy sources, particularly the renewable ones, have enjoyed a clean image vis a vis environmental impacts. The only major exception to this general trend has been large hydropower projects; experience has taught that they can be disastrous for the environment. The belief now is that mini hydro and microhydro projects are harmless alternatives. But are renewable energy sources really as benign as is widely believed? The present essay addresses this question in the background of Lovin`s classical paradigm which had postulated the hard (malignant) and soft (benign) energy concepts in the first place. It then critically evaluates the environmental impacts of major renewable energy sources. It then comes up with the broad conclusion that renewable energy sources are not the panacea they are popularly perceived to be; indeed in some cases their adverse environmental impacts can be as strongly negative as the impacts of conventional energy sources. The paper also dwells on the steps needed to utilize renewable energy sources without facing environmental backlashes of the type experienced from hydropower projects.

Abbasi, S.A.; Abbasi, N. [Pondicherry Univ., Kalapet Pondicherry (India). Centre for Pollution Control and Biowaste Energy

1997-09-01T23:59:59.000Z

14

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an Environmental Impact Statement and to Conduct Scoping Meetings Hualapai Valley Solar Interconnection Project in Mohave County, Arizona July 30, 2009 EIS-0425: Notice of...

15

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2010 EIS-0455: Notice of Adoption of an Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA December 17, 2010 EIS-0403: EPA Notice of...

16

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico...

17

Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

18

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 1996 EIS-0240: Final Environmental Impact Statement Disposition of Surplus Highly Enriched Uranium previous 1 2 3 4 5 6 7 8 next Energy.gov Careers & Internships...

19

Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6E/EIS-0096-F . Ji^ ' 6E/EIS-0096-F . Ji^ ' w V' - > DOE/EIS--00 96-F-Vol.1 //C^ DE84 0 0 1 4 4 6 Final Environmental Impact Statement Remedial Actions at the Former Vitro Rare Metals Plant Site, Canonsburg, Washington County, Pennsylvania United States Department of Energy July 1983 Volume I r NOTICE } IPORTIONS OF THIS REPORT ARE ILLEGIBLE.' / It has been reproduced from the besi ' available copy to permit the broadest possible availability. This document is PUBLICLY RELEASABLl Authorizmg OfFtciai Date: Z P l ^ o " ? isTWBUTim ef T H I S m\jM] IS mm\m DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal

20

Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 1 - Chapters U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Draft Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 1 - Chapters U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 DOE/EIS-0407D COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Energy Analysis and Environmental Impacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric power lines and climate change model Electric power lines and climate change model Energy Analysis and Environmental Impacts Energy Analysis and Environmental Impacts application/pdf icon eaei-org-chart-11-2013.pdf The Energy Analysis and Environmental Impacts Department analyzes U.S. and global energy consumption and the associated social, economic, and environmental impacts, including human health, greenhouse gas emissions, and global climate change. Researchers conduct R&D and provide technical assistance to governments on: Lifecycle analysis of products and industries; How energy use affects health in the indoor environment; Energy markets and utility policy; Renewable energy policy and economics; Energy efficiency standards and codes; International energy and environmental impacts in the developed and

22

Environmental Impact of Smart Grid  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of Smart Grid Impact of Smart Grid January 10, 2011 2 Agenda * Review of Paper - Introduction - Key Areas of Impact - Findings - Conclusions - Recommended Topics for Further Research 3 3 Introduction Provide background for the current state of environmental impact of Smart Grid * Summarize key components of criteria pollutants from electricity and transportation sectors * Define the Smart Grid and how it can be used to reduce pollutants * Evaluate impact from Smart Grid on reducing pollutants through: - Demand Response - Electric Vehicles - Demand Side Management - Renewables and Distributed Energy Resources - Transmission and Distribution Systems Use this knowledge to address topics for further research Key Areas of Impact 5 Key Areas of Review and Consideration for Environmental Impacts *

23

EIS-0269: Final Programmatic Environmental Impact Statement ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain...

24

DOE Prepares Programmatic Environmental Impact Statement for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home DOE Prepares Programmatic Environmental Impact Statement for the Uranium Leasing Program DOE Prepares Programmatic Environmental Impact Statement for the...

25

EIS-0161: Final Programmatic Environmental Impact Statement ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain...

26

Environmental impact of HTGR power stations  

SciTech Connect

From ANS topical meeting on gas-cooled reactors: HTGR and GCFBR; Gatlinburg, Tennessee, USA (8 May 1974). The high-temperature gas-cooled reactor power station has all of the potential environmental impacts associated with any large nuclear station. Construction impacts can be minimized by proper planning and are usually of limited duration. The potentially most significant impacts of station operation result from the operation of the heat dissipation system. The use of cooling towers is assumed. The effects of salt deposition, fogging, and icing are expected to be minor. The magnitude of the adverse effects caused by intake and discharge such as entrainment of eggs, larvae, and fish and chemical impacts from blowdown can only be assessed for a specific site but may be signlficant. The impact of radionuclide releases, constrained by the as-low-as- is-practicable criteria, is small. The only potential environmental advantage over other reactor types is lower consumptive water use for the same net electric power production. (auth)

Kelly, M.J.; Kirslis, S.S.; West, R.G.

1974-04-30T23:59:59.000Z

27

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 EIS-0158-S2: Final Supplemental Environmental Impact Statement Program Environmental Impact Report for the Sale of the Naval Petroleum Reserve No. 1 at Elk Hills, California September 1, 1997 EIS-0026-S2: Final Supplemental Environmental Impact Statement Carlsbad Area Office, Waste Isolation Pilot Plant Disposal Phase July 1, 1997 EIS-0213: Final Environmental Impact Statement Nez Perce Tribal Hatchery Program June 6, 1997 EIS-0200: Final Programmatic Environmental Impact Statement Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste December 1, 1996 EIS-0229: Final Programmatic Environmental Impact Statement Storage and Disposition of Weapons-Usable Fissile Materials December 1, 1996 EIS-0198: Programmatic Environmental Impact Statement

28

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 EIS-0409: Final Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project April 9, 2010 EIS-0404: Final Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California April 9, 2010 EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA April 1, 2010 EIS-0415: Final Environmental Impact Statement Deer Creek Station Energy Facility Project Brookings County, South Dakota February 19, 2010 EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South January 29, 2010 EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury January 1, 2010 EIS-0418: Draft Environmental Impact Statement

29

Pollution Prevention - Environmental Impact Reduction Checklists for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pollution Prevention - Environmental Impact Reduction Checklists Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers The environmental review process under the National Environmental Policy Act (NEPA) provides a valuable opportunity for Federal agency NEPA/309 reviewers to incorporate pollution prevention and environmental impact reduction into actions (or projects). This Environmental Protection Agency guidance was prepared to assist NEPA/309 reviewers in incorporating pollution prevention into each step of the environmental review process, including scoping, mitigation, monitoring, and enforcement. POLLUTION PREVENTION - ENVIRONMENTAL IMPACT REDUCTION CHECKLISTS FOR NEPA/309 REVIEWERS JANUARY 1995

30

Pollution Prevention - Environmental Impact Reduction Checklists for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pollution Prevention - Environmental Impact Reduction Checklists Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers The environmental review process under the National Environmental Policy Act (NEPA) provides a valuable opportunity for Federal agency NEPA/309 reviewers to incorporate pollution prevention and environmental impact reduction into actions (or projects). This Environmental Protection Agency guidance was prepared to assist NEPA/309 reviewers in incorporating pollution prevention into each step of the environmental review process, including scoping, mitigation, monitoring, and enforcement. POLLUTION PREVENTION - ENVIRONMENTAL IMPACT REDUCTION CHECKLISTS FOR NEPA/309 REVIEWERS JANUARY 1995

31

EIS-0372: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or amendment of a permit for a proposed action is in the public interest, DOE considers the environmental impacts of the proposed project pursuant to NEPA, the project's impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system

32

Final Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Foreword COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada

33

Incorporating Biodiversity Considerations Into Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Incorporating Biodiversity Considerations Into Environmental Impact Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under NEPA Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under NEPA This Council on Environmental Quality (CEQ) report is intended to provide background on the emerging, complex subject of biodiversity, outline some general concepts that underlie biological diversity analysis and management, describe how the issue is currently addressed in NEPA analyses, and provide options for agencies undertaking NEPA analyses that consider biodiversity. Council on Environmental Quality: Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under the National Environmental Policy Act More Documents & Publications Habitat Evaluation: Guidance for the Review of Environmental Impact

34

Incorporating Biodiversity Considerations Into Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Incorporating Biodiversity Considerations Into Environmental Impact Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under NEPA Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under NEPA This Council on Environmental Quality (CEQ) report is intended to provide background on the emerging, complex subject of biodiversity, outline some general concepts that underlie biological diversity analysis and management, describe how the issue is currently addressed in NEPA analyses, and provide options for agencies undertaking NEPA analyses that consider biodiversity. Council on Environmental Quality: Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under the National Environmental Policy Act More Documents & Publications Habitat Evaluation: Guidance for the Review of Environmental Impact

35

Analysis of Environmental Impacts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis of Environmental Impacts Analysis of Environmental Impacts Analysis of Environmental Impacts Selected documents on the Analysis of Environmental Impacts under NEPA. October 3, 1984 Policy and Procedures for the Review of Federal Actions Impacting the Environment This manual establishes policies and procedures for carrying out the Environmental Protection Agency's responsibilities to review and comment on Federal actions affecting the quality of the environment. January 5, 1981 Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979. November 17, 1980

36

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 25, 2005 November 25, 2005 EIS-0372: Final Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect September 1, 2005 EIS-0351: Final Environmental Impact Statement Operation of Flaming Gorge Dam August 26, 2005 EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect August 5, 2005 EIS-0355: Final Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah July 1, 2005 EIS-0353: Final Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program April 29, 2005 EIS-0348: Final Site-wide Environmental Impact Statement Continued Operation of Lawrence Livermore National Laboratory and

37

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1, 2003 July 1, 2003 EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line June 6, 2003 EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact Statement Stockpile Stewardship and Management for a Modern Pit Facility June 2, 2003 EIS-0345: Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington June 2, 2003 EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project May 23, 2003 EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project May 15, 2003 EIS-0350: Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los

38

Environmental Impact Statements Related Documents | National...  

National Nuclear Security Administration (NNSA)

2008 SWEIS (PDF, 52KB) 2008 Site-Wide Environmental Impact Statement Mitigation Action Plan 2011 Annual Report (PDF, 10MB) 2008 Site-Wide Environmental Impact Statement Mitigation...

39

Final Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Volume II Appendices A through J U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S 1 June 2008 ACRONYMS AND ABBREVIATIONS To ensure a more reader-friendly document, the U.S. Department of Energy (DOE) limited the use of acronyms and abbreviations in this Repository supplemental environmental impact statement. In addition, acronyms and abbreviations are defined the first time they are used in each chapter or appendix. The acronyms and abbreviations used in the text of this document are listed below. Acronyms and abbreviations used in tables and figures because of

40

Environmental Impacts of Smart Grid  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Impacts of Smart Grid Environmental Impacts of Smart Grid January 10, 2011 DOE/NETL-2010/1428 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0312: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

42

EIS-0394: EPA Notice of Availability of the Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Environmental Impact Statement FutureGen Environmental Impact...

43

EIS-0283: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0283: Final Environmental Impact Statement Surplus Plutonium Disposition This EIS analyzes the potential environmental impacts associated with...

44

EIS-0283: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0283: Draft Environmental Impact Statement Surplus Plutonium Disposition Draft Environmental Impact Statement This EIS evaluates the potential...

45

GRR/Section 9-WA-c - State Environmental Impact Statement | Open Energy  

Open Energy Info (EERE)

GRR/Section 9-WA-c - State Environmental Impact Statement GRR/Section 9-WA-c - State Environmental Impact Statement < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-c - State Environmental Impact Statement 9-WA-c - State Environmental Impact Statement.pdf Click to View Fullscreen Triggers None specified The primary purpose of an Environmental Impact Statement (EIS) is to ensure that the Washington State Environmental Policy Act (SEPA) policies are an integral part of the ongoing programs and actions of state and local government. An EIS must provide impartial discussion of significant environmental impacts and must inform decision makers and the public of reasonable alternatives, including mitigation measures that would avoid or minimize adverse impacts or enhance environmental quality. WAC 197-11-400.

46

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart This chart represents anticipated activity and is not a commitment for documentation or dates. October 21, 2011 EIS-0426: Notice of Extension of Public Comment Period for the Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada September 26, 2011 EA-1792: Finding of No Significant Impact University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine September 26, 2011 EA-1792: Final Environmental Assessment University of Maine's DeepWater Offshore Floating Wind Turbine Testing and

47

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements are detailed written statements that are required by section 102(2)(C) of NEPA for a proposed major Federal action significantly affecting the quality of the human environment. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1999 EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington August 1, 1999 EIS-0285: Draft Environmental Impact Statement Bonneville Power Administration Transmission System Vegetation Management Program (August 1999) August 1, 1999 EIS-0289: Draft Environmental Impact Statement

48

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 1, 2002 May 1, 2002 EIS-0303: Final Environmental Impact Statement High-Level Waste Tank Closure March 1, 2002 EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington February 1, 2002 EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project February 1, 2002 EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project January 1, 2002 EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm November 1, 2001 EIS-0309: Final Site-Wide Environmental Impact Statement Oak Ridge Y-12 Plant August 1, 2001 EIS-0319: Draft Environmental Impact Statement Proposed Relocation or Technical Area 18 Capabilities and Material at Los Alamos National Lab

49

EIS-0218: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0218: Final Environmental Impact Statement Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear...

50

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1, 1995 October 1, 1995 EIS-0245: Draft Environmental Impact Statement Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington July 21, 1995 EIS-0182: Final Programmatic Environmental Impact Statement Energy Planning And Management Program July 1, 1995 EIS-0217: Final Environmental Impact Statement Savannah River Site Waste Management May 1, 1995 EIS-0228: Final Environmental Impact Statement Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility April 1, 1995 EIS-0203: Programmatic Final Environmental Impact Statement Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs January 1, 1995 EIS-0220: Final Environmental Impact Statement Savannah River Site, Interim Management of Nuclear Materials

51

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 23, 2009 September 23, 2009 EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas September 21, 2009 EIS-0435: Notice of Intent to Prepare an Environmental Impact Statement and Conduct a Scoping Meeting Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota September 15, 2009 EIS-0434: Notice of Intent To Prepare an Environmental Impact Statement and to Conduct Scoping Meetings Hualapai Valley Solar Interconnection Project in Mohave County, Arizona July 30, 2009 EIS-0425: Notice of Intent to Prepare an Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA

52

Environmental impact assessment Geopressure Subprogram  

DOE Green Energy (OSTI)

This environmental impact assessment (EIA) addresses the expected programmatic activities of the Geopressure Subprogram of the Division of Geothermal Energy. The goal of the Geopressure Subprogram is to stimulate development of geopressured resources as an economic, reliable, operationally safe, and environmentally acceptable energy source. The subprogram includes activities in the areas of engineering research and development; resource exploration, assessment, and development; resource utilization including pilot and demonstration facilities; and environmental research and control technology development. It should be recognized that most of the subprogram activities extend over several years and are in their early stages of implementation at this time. The zones of potential geopressure development are in the region located along the Texas and Louisiana Gulf Coasts extending up to 200 miles (300 km) inland. Geopressured zones are sedimentary basins where water is trapped at high pressures within or below thick, nearly impermeable shale sequences. The confined water supports most or all of the weight of the overburden. This inhibits sediment compaction and causes formation pore pressure to exceed hydrostatic pressure. in sedimentary basins that are underlain by thin oceanic crust, upward thermal conduction from the mantle heats geopressured fluids and sediments to abnormally high temperatures, often in excess of 260 C (500 F).

None

1977-07-01T23:59:59.000Z

53

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Energy Project, Ector, Texas August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California...

54

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 1, 2007 November 1, 2007 EIS-0389: Final Environmental Impact Statement Trinity Public Utilities District Direct Interconnection Project November 1, 2007 EIS-0394: Final Environmental Impact Statement FutureGen Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 12, 2007 EIS-0250-S2: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain-Nevada Rail Transportation Corridor October 1, 2007 EIS-0357: Final Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project, Gilberton, Pennsylvania October 1, 2007 EIS-0378: Final Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project

55

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 6, 2012 December 6, 2012 EIS-0391: Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Hanford Site, Richland, WA October 5, 2012 EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY September 20, 2012 EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas July 25, 2012 EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition July 24, 2012 EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) May 31, 2012 EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County,

56

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2011 20, 2011 EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0468: Final Environmental Impact Statement Proposed American Centrifuge Plant in Piketon, Ohio Pike County, Ohio April 29, 2011 EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico March 25, 2011 EIS-0458: Draft Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA March 18, 2011 EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas March 11, 2011 EIS-0445: Draft Environmental Impact Statement

57

Environmental impact of various kayak core materials  

E-Print Network (OSTI)

This thesis compares the environmental impact of fiberglass, Kevlar, carbon fiber, and cork. A kayak company is interested in using cork as a core material, and would like to claim that it is the most environmentally ...

Kirkland, David R. (David Roger)

2008-01-01T23:59:59.000Z

58

EIS-0250: Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain (July 1999)

59

Natural Gas Variability In California: Environmental Impacts...  

NLE Websites -- All DOE Office Websites (Extended Search)

Natural Gas Variability In California: Environmental Impacts And Device Performance, Combustion Modeling of Pollutant Emissions From a Residential Cooking Range Title Natural Gas...

60

Northern Pass Transmission Line Project Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September...

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

FINAL ENVIRONMENTAL IMPACT STATEMENT/PLAN...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL IMPACT STATEMENTPLAN AMENDMENT Rice Solar Energy Project Riverside County, California Lead Agency Cooperating Agency U.S. Department of Energy Western Area Power...

62

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disposition July 24, 2012 EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) May 31,...

63

Environmental Impact Statements (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

establishes the responsibility of the state to preserve and enhance the environment. State agencies are required to consider environmental science and impacts in any planning...

64

Schedules of Key Environmental Impact Statements  

Energy.gov (U.S. Department of Energy (DOE))

This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly). This chart represents anticipated activity and is not a...

65

CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CAMERON LIQUEFACTION PROJECT CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................... ES-1 PROPOSED ACTION ............................................................................................................... ES-1 PUBLIC INVOLVEMENT ....................................................................................................... ES-3 PROJECT IMPACTS ................................................................................................................ ES-3 ALTERNATIVES CONSIDERED ........................................................................................... ES-7 CONCLUSIONS ....................................................................................................................... ES-8

66

Environmental Impact Assessment (Prince Edward Island, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

The Province of PEI has established an environmental impact assessment process for projects that could have an impact on the environment. The Province and the Federal Government cooperate in the...

67

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 3, 2011 June 3, 2011 EIS-0435: EPA Notice of Availability of the Final Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota May 23, 2011 EIS-0460: Notice of Intent to Prepare an Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois May 20, 2011 EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0471: Notice of Adoption of an Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, Piketon, OH April 29, 2011 EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental

68

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 8, 2007 November 8, 2007 EIS-0382: DOE Notice of Availability of the Draft Environmental Impact Statement Mesaba Energy Project, Itasca, Minnesota October 17, 2007 EIS-0402: Advance Notice of Intent to Prepare an Environmental Impact Statement Remediation of Area IV of the Santa Susana Field Laboratory August 10, 2007 EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO July 23, 2007 EIS-0375: Notice of Intent to Prepare an Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste August 31, 2006 EIS-0380: Notice to Extend Comment Period on the Draft Site-Wide Environmental Impact Statement Continued Operation of Los Alamos National Laboratory, Los Alamos, New

69

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 12, 2011 January 12, 2011 EIS-0407: Record of Decision Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas January 4, 2011 EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada December 17, 2010 EIS-0455: Notice of Adoption of an Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA December 17, 2010 EIS-0403: EPA Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States December 14, 2010 EIS-0459: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Hawai'i Interisland Renewable Energy Program December 10, 2010 EIS-0421: Draft Environmental Impact Statement

70

EIS-0377: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental impacts of...

71

EIS-0383: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result...

72

EIS-0440: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0440: Final Environmental Impact Statement Quartzsite Solar Energy Project The Final Environmental Impact Statement (FEIS) consists of a summary...

73

EIS-0244: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement EIS-0244: Final Environmental Impact Statement Plutonium Finishing Plant Stabilization This EIS evaluates the impacts on the human...

74

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 28, 2010 May 28, 2010 EIS-0419: EPA Notice of Availability of the Draft Environmental Impact Statement Whistling Ridge Energy Project, Construction and Operation of a 75-megawatt Wind Turbine Facility, City of White Salmon, Skamania County, WA May 13, 2010 EA-1707: Draft Environmental Assessment Closure of Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill, Hanford Site, Richland, Washington April 9, 2010 EIS-0404: EPA Notice of Availability of the Final Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California April 9, 2010 EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA April 9, 2010 EIS-0455: EPA Notice of Availability of the Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA

75

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation or date. Last Revised: 12/19/2013 StatusChart_December2013revised.pdf More Documents & Publications 2013 Annual Planning Summary for the Western Area Power Administration 2012 Annual Planning Summary for Western Area Power Administration 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION

76

ISSUES AND ENVIRONMENTAL IMPACTS ASSOCIATED WITH  

E-Print Network (OSTI)

of a given power plant on the local environment, e.g., do thermal impacts and entrainment impacts affect AT CALIFORNIA'S COASTAL POWER PLANTS In Support of the 2005 Environmental Performance Report and 2005 Integrated ............................................................... 7 Real And Potential Impacts Of California's Coastal Power Plants............................ 9

77

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 5, 2011 August 5, 2011 EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement Texas Clean Energy Project, Ector, Texas August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California August 3, 2011 EA-1840: Finding of No Significant Impact Loan Guarantee to High Plains II, LLC for the California Valley Solar Ranch Project in San Luis Obispo County and Kern County, California July 29, 2011 EIS-0426: Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada July 29, 2011 EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings

78

The regional environmental impact of biomass production  

DOE Green Energy (OSTI)

The objective of this paper is to present a broad overview of the potential environmental impacts of biomass energy from energy crops. The subject is complex because the environmental impact of using biomass for energy must be considered in the context of alternative energy options while the environmental impact of producing biomass from energy crops must be considered in the context of the alternative land-uses. Using biomass-derived energy can reduce greenhouse gas emissions or increase them; growing biomass energy crops can enhance soil fertility or degrade it. Without knowing the context of the biomass energy, one can say little about its specific environmental impacts. The primary focus of this paper is an evaluation of the environmental impacts of growing energy crops. I present an approach for quantitatively evaluating the potential environmental impact of growing energy crops at a regional scale that accounts for the environmental and economic context of the crops. However, to set the stage for this discussion, I begin by comparing the environmental advantages and disadvantages of biomass-derived energy relative to other energy alternatives such as coal, hydropower, nuclear power, oil/gasoline, natural gas and photovoltaics.

Graham, R.L.

1994-09-01T23:59:59.000Z

79

Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report  

DOE Green Energy (OSTI)

The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)

Not Available

1981-08-01T23:59:59.000Z

80

Resource Contingency Program : Draft Environmental Impact Statement.  

SciTech Connect

In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

United States. Bonneville Power Administration.

1995-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

DOE/EIS-0476 Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Environmental Impact Statement for the Proposed Vogtle Electric Generating Plant, Units 3 and 4 Burke County, Georgia Final Environmental Impact Statement U.S. Nuclear Regulatory Commission NUREG-1872 and NUREG-1947, Adopted as DOE/EIS-0476 U.S. Department of Energy February 2012 Lead Federal Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for the Proposed Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia (Adopted) DOE/EIS-0476 Contact: For additional copies or more information on this Final Environmental Impact Statement (EIS), please contact: Mr. Matthew McMillen U.S. Department of Energy Loan Programs Office (LP-10) 1000 Independence Avenue, SW Washington, DC 20585 Phone: 202-586-7248

82

An environmental impact analysis of grinding  

E-Print Network (OSTI)

This thesis was intended to investigate the environmental impact of grinding in the United States manufacturing industry. Grinding is an ideal method for producing parts with a fine surface finish and high dimensional ...

Baniszewski, Beth (Beth Ellen)

2005-01-01T23:59:59.000Z

83

EIS-0423: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury Notice of Intent to prepare an environmental impact statement for the long-term...

84

EIS-0240: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0240: Final Environmental Impact Statement Disposition of Surplus Highly Enriched Uranium This document assesses the environmental impacts that may result from...

85

EIS-0290: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential...

86

EIS-0323-S1: Draft Supplement Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: Draft Supplement Environmental Impact Statement EIS-0323-S1: Draft Supplement Environmental Impact Statement Sacramento Area Voltage Support Construction and operation has...

87

EIS-0270: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Final Environmental Impact Statement EIS-0270: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

88

EIS-0271: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

89

EIS-0400: EPA Notice of Availability of Final Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: EPA Notice of Availability of Final Environmental Impact Statement EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement Granby Pumping Plant...

90

EIS-0431: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's...

91

EIS-0431: DOE Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of Draft Environmental Impact Statement EIS-0431: DOE Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's...

92

EIS-0249: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Final Environmental Impact Statement EIS-0249: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

93

EIS-0350: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0350: Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

94

EIS-0412: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an Environmental Impact Statement Construction of the TX Energy, LLC, Industrial Gasification Facility near Beaumont, Texas Notice of Intent to Prepare an Environmental Impact...

95

EIS-0365: Draft Environmental Impact Statement for the Imperial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) EIS-0365: Draft Environmental Impact Statement for the...

96

EIS-0119: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0119: Final Environmental Impact Statement Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington...

97

DOE Plans Supplemental Environmental Impact Statement for New...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi DOE Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site...

98

EIS-0455: Plan Amendment/Final Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Plan AmendmentFinal Environmental Impact Statement for the Genesis Solar Energy Project, California EIS-0455: Plan AmendmentFinal Environmental Impact Statement for the...

99

EIS-0458: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0458: Draft Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis...

100

EIS-0439: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EIS-0455: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA EIS-0445-DEIS-Summary-20101.pdf...

102

EIS-0454: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project EIS-0454-FEIS-2011.pdf More Documents &...

103

EIS-0290: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0290: Draft Environmental Impact Statement U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste...

104

3D Simulations in Environmental Impact Assessment  

Science Conference Proceedings (OSTI)

The increase of petrol cost and the failure of Kyoto agreement generated huge investments in renewable energy sources. In recent times a lot of local authorities allowed wind farm location. In many cases, environmental impact assessments do not take ... Keywords: 3D CAD models, 3D GIS analysis, Multimedia techniques, Viewshed, Visual impact assessment, Wind farm

Maria Danese; Giuseppe Las Casas; Beniamino Murgante

2008-06-01T23:59:59.000Z

105

Evaluation of environmental impact assessment system in Pakistan  

SciTech Connect

Environmental impact assessment (EIA) was first introduced in Pakistan based on the Environmental Protection Ordinance 1983. The EIA process was further strengthened under the Pakistan Environmental Protection Act 1997, which became operational under EIA Regulations 2000. Despite a sound legal basis and comprehensive guidelines, evidence suggests that EIA has not yet evolved satisfactorily in Pakistan. An evaluation of the EIA system against systematic evaluation criteria, based on interviews with EIA approval authorities, consulting firms and experts, reveals various shortcomings of the EIA system. These mainly include; inadequate capacity of EIA approval authorities, deficiencies in screening and scoping, poor EIA quality, inadequate public participation and weak monitoring. Overall, EIA is used presently as a project justification tool rather than as a project planning tool to contribute to achieving sustainable development. Whilst shortcomings are challenging, central government has recently shown a high degree of commitment to the environmental protection by making EIA compulsory for all the public sector projects likely to have adverse environmental impacts. The paper identifies opportunities for taking advantage of the current environment for strengthening the EIA process.

Nadeem, Obaidullah [Department of City and Regional Planning, University of Engineering and Technology, Lahore (Pakistan)], E-mail: obaidnadeem@yahoo.com; Hameed, Rizwan [Department of City and Regional Planning, University of Engineering and Technology, Lahore (Pakistan)], E-mail: d_rizwan@hotmail.com

2008-11-15T23:59:59.000Z

106

Volume I Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volume I Volume I Final Environmental Impact Statement for the Searchlight Wind Energy Project NVN-084626 and NVN-086777 Bureau of Land Management Las Vegas Field Office in cooperation with Western Area Power Administration National Park Service December 2012 Searchlight Wind Energy Project FEIS Executive Summary Page | i Executive Summary The Final Environmental Impact Statement (FEIS) for the Searchlight Wind Energy Project is summarized in the following sections. This summary provides a general overview of the project and its purpose and need; briefly describes the Proposed Action and other alternatives; and summarizes major impacts for key resources. Searchlight Wind Energy, LLC, (the Applicant) a wholly-owned subsidiary of Duke Energy has applied

107

Sacramento Area Voltage Support Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E E R R A N E V A D A R E G I O N Sacramento Area Voltage Support DRAFT ENVIRONMENTAL IMPACT STATEMENT DRAFT ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0323 NOVEMBER 2002 COVER SHEET Title: Sacramento Area Voltage Support Draft Environmental Impact Statement (EIS) Lead Agency: Western Area Power Administration (Western) Location: Alameda, Contra Costa, Placer, Sacramento, San Joaquin, and Sutter Counties, State of California. EIS Number: DOE/EIS-0323 Contact: Ms. Loreen McMahon, Environmental Project Manager Western Area Power Administration Sierra Nevada Region 114 Parkshore Drive Folsom, CA 95630 (916) 353-4460 (916) 985-1936 fax email: mcmahon@wapa.gov Website: Information is also available on our website: www.wapa.gov Hotline: 1-877-913-4440 (toll-free) Abstract The Western Area Power Administration's Central Valley Project transmission system forms an integral part of

108

Draft Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Environmental Impact Statement Site-Wide Environmental Impact Statement for the Y-12 National Security Complex October 2009 U.S. Department of Energy National Nuclear Security Administration Y-12 Site Office DOE/EIS-0387 COVER SHEET RESPONSIBLE AGENCY: United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) TITLE: Draft Site-wide Environmental Impact Statement for the Y-12 National Security Complex (DOE/EIS-0387) (Draft Y-12 SWEIS) CONTACT: For further information on this SWEIS, For general information on the DOE contact: National Environmental Policy Act (NEPA) process, contact: Pam Gorman Carol Borgstrom, Director Y-12 SWEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Y-12 Site Office U.S. Department of Energy

109

Environmental impact of fusion power  

SciTech Connect

From 140th meeting on the American Association for the Advancement of Science; San Francisco, California, USA (24 Feb The environmental effects of fusion power is considered assuming as a typical model a conceptual design for a full-scale fusion power plant. The appraisal indlcates that such a system would yield plentiful, cheap power for all of the world's energy requirements and provide fine solutions to most of the environmental pollution problems if the uncertainties in the plasma physics can be resolved in the fashion that current experiments lead one to expect. (auth)

Fraas, A.P.

1973-01-01T23:59:59.000Z

110

EIS-0423-S1: Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

111

EIS-0283: Surplus Plutonium Disposition Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

This EIS analyzes the potential environmental impacts associated with alternatives for the disposition of surplus plutonium.

112

Chapter 16: Environmental Impact Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR FOR 10 CFR 431 ENERGY CONSERVATION PROGRAM FOR COMMERCIAL AND INDUSTRIAL EQUIPMENT: PACKAGED TERMINAL AIR CONDITIONER AND PACKAGED TERMINAL HEAT PUMP ENERGY CONSERVATION STANDARDS; FINAL RULE October 2008 DOE/EA-1637 NOTE: The following Environmental Assessment (DOE/EA-1637) was integrated into the Technical Support Document (TSD) that was prepared for the Final Rule, 10 CFR Part 431, regarding the Department of Energy's energy conservation standards rulemaking on packaged terminal air conditioners and packaged terminal heat pumps. The environmental analysis was contained in Chapter 16 of the TSD, which is provided here. The complete TSD is located on the Office of Energy Efficiency and Renewable Energy's Website at the following URL:

113

EIS-0411: Notice of Cancellation of the Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cancellation of the Environmental Impact Cancellation of the Environmental Impact Statement EIS-0411: Notice of Cancellation of the Environmental Impact Statement Transmission Agency of Northern California Transmission Project Western Area Power Administration (Western), an agency of the Department of Energy (DOE), is canceling preparation of the Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for construction, operation, and maintenance of the proposed Transmission Agency of Northern California (TANC) Transmission Project. Western Area Power Administration Notice of Cancellation of the Transmission Agency of Northern California Transmission Project, Environmental Impact Statement More Documents & Publications EIS-0183: Notice of Extension of Scoping Period EIS-0377: DOE Notice of Availability of the Final Environmental Impact

114

NREL: Wind Research - Environmental Impacts Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Impacts Research Environmental Impacts Research Photo of a Greater Prairie-Chicken. Credit: James Shroyer. NREL is a partner in the Grassland Shrub Steppe Species Collaborative, a multi-year effort to study wind turbines in prairie chicken habitat. The Wind Program at NREL works to resolve environmental issues that may hinder acceptance of wind energy technologies. The program accomplishes this through activities that address the potential effects of wind development on wildlife and identifies corresponding mitigation strategies. As part of this effort, the program supports the work of the National Wind Coordinating Collaborative (NWCC) Wildlife Workgroup, which is focused on collaborative approaches for understanding and evaluating species- and habitat-specific impacts, mitigation tools, risk assessment, and nocturnal

115

Environmental Assessment Fact Sheet - Potential Impacts  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE has prepared a draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. It examines the potential environmental consequences from conducting particular types of scientific experiments in an area of the WIPP underground called the experiment gallery. The environmental assessment also looks at the potential cumulative impacts of conducting experiments and operating the WIPP as a transuranic waste repository. This fact sheet presents questions and answers about potential impacts to human health and the environment and proposed protections and mitigations, based on the draft environmental assessment. The deep geologic repository at the WIPP could be the most favorable U.S. environment currently available for experiments in many scientific disciplines, including particle astro-

116

Salmon Creek Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUGUST 2004 AUGUST 2004 SALMON CREEK PROJECT Draft Environmental Impact Statement DOE/EIS-0346 Lead Agency U.S. Dept of Energy, Bonneville Power Administration Cooperating Agencies U.S. Dept of Interior, Bureau of Reclamation Confederated Tribes of the Colville Reservation Okanogan Irrigation District Salmon Creek Project Draft Environmental Impact Statement (DOE/EIS-0346) Responsible Agency: Bonneville Power Administration (BPA), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior, Bureau of Reclamation, Confederated Tribes of the Colville Reservation, Okanogan Irrigation District. County and State Involved: Okanogan County, Washington Abstract: BPA proposes to fund activities that would restore sufficient water flows to Salmon Creek and

117

EIS-0366: Notice of Cancellation of a Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cancellation of a Programmatic Environmental Cancellation of a Programmatic Environmental Impact Statement EIS-0366: Notice of Cancellation of a Programmatic Environmental Impact Statement Implementation of the Carbon Sequestration Program The Department of Energy (DOE) has decided to cancel the preparation of a Programmatic Environmental Impact Statement (PEIS) for the assessment of potential environmental impacts from DOE's Carbon Sequestration Program. Notice of Cancellation of Programmatic Environmental Impact Statement for Implementation of the Carbon Sequestration Program (DOE/EIS-0366) (February 2007 - 72 FR 8363) More Documents & Publications EIS-0366: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Lessons Learned Quarterly Report, June 2004 Lessons Learned Quarterly Report, March 2007

118

EIS-0256: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

256: Final Environmental Impact Statement 256: Final Environmental Impact Statement EIS-0256: Final Environmental Impact Statement Sierra Pacific Power Company Alturas Transmission Line Project This Environmental Impact Report/Environmental Impact Statement (EIR/S) describes the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power. This volume contains the Executive Summary. Environmental Impact Statement for Sierra Pacific Power Company Alturas Transmission Line Project, DOE/EIS-0256 (November 1995)

119

Sundance Energy Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS - 0322 DOE/EIS - 0322 Sundance Energy Project Final Environmental Impact Statement Western Area Power Administration June 2001 DOE/EIS - 0322 COVER SHEET Title: Sundance Energy Project, Pinal County, AZ, Final Environmental Impact Statement Lead Agency:U.S. Department of Energy, Western Area Power Administration For information about the Sundance Energy For general information on the DOE EIS Project contact: process, contact: Mr. John Holt, Environmental Manager Ms. Carol Borgstrom, Director Western Area Power Administration NEPA Policy and Assistance, EH-42 Desert Southwest Region U.S. Department of Energy P.O. Box 6457 1000 Independence Avenue, SW Phoenix, AZ 85005-6457 Washington, DC 20585 (602) 352-2592 (202) 586-4600 or (800) 472-2756 Fax: (602) 352-2630 E-mail: holt@wapa.gov

120

Improving landscape-level environmental impact evaluations.  

Science Conference Proceedings (OSTI)

New spatial data and advancements in GIS tools allow much more comprehensive and quantitative analyses of the large datasets required when making programmatic evaluations of the ecological effects of proposed activities that cover a large area or region. Understanding the environmental impacts of proposed human developments is critical to making appropriate siting decisions and designing mitigation strategies to reduce impacts on important resources. Impact analyses conducted under the National Environmental Policy Act (NEPA) in Environmental Impact Statements (EISs) or Environmental Assessments (EAs) are intended to determine the resource-specific impacts of proposed activities of federal agencies and their alternatives using the best available information. Impacts to ecological resources are often a primary focus of these analyses. Information used in NEPA analyses include some measure of the known or probable presence of plants and wildlife in the project area, with special emphasis placed on threatened, endangered, and other special-status species. Site-specific information pertaining to ecological resources is usually easier to obtain for small-scale activities such as a local facility, road, or transmission upgrade project, where the ability to conduct fieldwork is more often feasible. However, site-specific data is more difficult-and sometimes impossible-to obtain for proposed activities that could affect a large area or region. These types of analyses often are considered in programmatic NEPA documents, in which a federal agency evaluates the implementation of a broad program or plan. Under these programmatic evaluations, the exact location and size of developments are often not known. Because obtaining quantitative information for ecological resources at such large spatial scales is difficult, programmatic impact evaluations typically rely on sketchy or partial information such as recorded species occurrences, species ranges, and general habitat descriptions. However, new spatial data and improved GIS tools allow much more comprehensive and quantitative analyses using large, readily available datasets. The availability of large-scale regional data such as GAP land-cover models or species habitat suitability models, combined with more robust spatial analysis procedures available through ArcGIS for Desktop software, allowed the analysis of multiple datasets at large spatial scales. This enabled researchers to surpass previous qualitative evaluations by developing a more accurate and quantitative approach for determining the environmental impacts of human activities at larger spatial scales. These approaches, combined with the utility of ModelBuilder and operability of Python scripts in ArcGIS, allow a more timely and cost-effective synthesis of available spatial data for programmatic evaluations and add a quantitative basis to environmental decision making.

Walston, L.J.; LaGory, K.E.; Vinikour, W.; Van Lonkhuyzen, R.L.; Cantwell, B. (Environmental Science Division)

2012-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Agencies Publish Final Environmental Impact Statement On Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement On Energy Final Environmental Impact Statement On Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West More Documents & Publications Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007.

122

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

123

FUTUREGEN PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT  

E-Print Network (OSTI)

This chapter provides information regarding the affected environment and the potential for impacts on each resource area in relation to construction and operation of the FutureGen Project at the proposed Mattoon Site. To aid the reader and to properly address the complexity of the FutureGen Project, as well as the need to evaluate four sites (two in Illinois and two in Texas), this Environmental Impact Statement (EIS) was prepared as two separate volumes. Volume I of the EIS includes the purpose and need for the agency action, a description of the Proposed Action and Alternatives, and a summary of the potential environmental consequences. Volume II addresses the affected environment and potential impacts for each of the four proposed alternative sites. Presenting the affected environment immediately followed by the potential impacts on each resource area allows the reader to more easily understand the relationship between current site conditions and potential project impacts on a particular resource. The Best and Final Offer (BAFO) information for the Mattoon site and its potential impacts have been addressed in Sections S.4.3 and 2.4.5, and Table S-1, S-12 and 3-3, and therefore are not reflected in the text of this section. Volume II is organized by separate chapters for each proposed site: Chapter 4-Mattoon, Illinois;

unknown authors

2007-01-01T23:59:59.000Z

124

Environmental Impact Statements; Notice of Availability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

817 817 Federal Register / Vol. 69, No. 94 / Friday, May 14, 2004 / Notices previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. Dated: May 11, 2004. Anne Norton Miller, Director, Office of Federal Activities. [FR Doc. 04-10991 Filed 5-13-04; 8:45 am] BILLING CODE 6560-50-P ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6651-3] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental

125

EIS-0471: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0468: Final Environmental Impact Statement EA-1607: Final Environmental Assessment Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium...

126

EIS-0290: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0290: Notice of Intent to Prepare an Environmental Impact Statement Advanced Mixed Waste Treatment Project at the Idaho National Engineering and Environmental...

127

EIS-0374: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project This summary covers the major points of the draft Environmental...

128

EIS-0276: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Prepare an Environmental Impact Statement Interim Storage of Plutonium at the Rocky Flats Environmental Technology Site, Golden, Colorado The Department of Energy (DOE)...

129

Draft Site-Wide Environmental Impact Statement Nevada | National...  

National Nuclear Security Administration (NNSA)

> About Us > Our Operations > NNSA Office of General Counsel > National Environmental Policy Act (NEPA) > NEPA Reading Room > Draft Site-Wide Environmental Impact Statement...

130

EIS-0409: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0409: Final Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project This Final EIS assesses the potential environmental...

131

EIS-0444: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0444: Notice of Intent to Prepare an Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas Notice of Intent to Prepare an Environmental...

132

DOE/EIS-0236-S1F; National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (January 2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUMMARY SUMMARY 1 This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial settlement of the lawsuit Civ. No. 97-936 (SS) (D.D.C.), Natural Resources Defense Council [NRDC] et al. v. Richardson et al. The Joint Stipulation and Order is reproduced at the end of this document as Attachment 1. In the Joint Stipulation and Order, the U.S. Department of Energy (DOE) agreed to prepare an SEIS to the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (SSM PEIS) (DOE/EIS-0236, DOE 1996a) to evaluate the reasonably foreseeable significant adverse environmental impacts of continuing to construct and of operating the National Ignition Facility (NIF) at Lawrence Livermore National

133

EIS-0288: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0288: Notice of Intent to Prepare an Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Department of Energy (DOE)...

134

EIS-0397: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0397: Final Environmental Impact Statement Lyle Falls Fish Passage Project BPA proposes to fund modifications to the existing Lyle Falls Fishway...

135

EIS-0150: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0150: Final Environmental Impact Statement Salt Lake City Area Integrated Projects Electric Power Marketing The Western Area Power Administration (Western)...

136

EIS-0284: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic...

137

EIS-0350: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0350: Final Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos,...

138

EIS-0302: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0302: Notice of Intent to Prepare an Environmental Impact Statement Transfer of the Heat Source Radioisotope Themoelectric Generator Assembly and Test...

139

EIS-0469: Draft Environmental Impact Statement | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Statement EIS-0469: Draft Environmental Impact Statement Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota This EIS evaluates the...

140

Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements, Second Edition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements Second Edition December 2004 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements Second Edition December 2004 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance printed on recycled paper Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements, Second Edition Preface This document provides recommendations for the Department of Energy's (DOE's) preparation of environmental assessments and environmental impact statements under the National Environmental

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EIS-0463: Reopening of Scoping Period for the Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reopening of Scoping Period for the Environmental Impact Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact Statement, EIS-0463 (April 2011) (76 FR 21338) More Documents & Publications EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0448: Notice of Adoption of an Environmental Impact Statement

142

EIS-0413: Final Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0413: Final Environmental Impact Statement The Department of the Interior's Bureau of Land Management, with DOE's Western Area Power Administration (WAPA) as a cooperating agency, prepared this EIS to evaluate the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by WAPA. EIS-0413: Final Environmental Impact Statement - Volume 1 EIS-0413: Final Environmental Impact Statement - Appendix A-1 - Public Scoping Report EIS-0413: Final Environmental Impact Statement - Appendix A-2 - NOA and Publications EIS-0413: Final Environmental Impact Statement - Appendix A-3 - Public

143

EIS-0463: Reopening of Scoping Period for the Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

463: Reopening of Scoping Period for the Environmental Impact 463: Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact Statement, EIS-0463 (April 2011) (76 FR 21338) More Documents & Publications EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0469: Notice of Intent To Prepare an Environmental Impact Statement and

144

EIS-0450: DOE Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of Draft Environmental Impact Statement EIS-0450: DOE Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct...

145

EIS-0450: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct...

146

Chief Joseph Hatchery Program, Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chief Joseph Hatchery Program Chief Joseph Hatchery Program Draft Environmental Impact Statement DOE/EIS-0384 May 2007 Chief Joseph Hatchery Program Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Project: Chief Joseph Hatchery Program Cooperating Tribe: Confederated Tribes of the Colville Reservation State Involved: Washington Abstract: The Draft Environmental Impact Statement (DEIS) describes a Chinook salmon hatchery production program sponsored by the Confederated Tribes of the Colville Reservation (Colville Tribes). BPA proposes to fund the construction, operation and maintenance of the program to help mitigate for anadromous fish affected by the Federal Columbia River Power System dams on the Columbia River. The Colville Tribes want to produce adequate

147

Ivanpah Energy Center Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL FINAL ENVIRONMENTAL IMPACT STATEMENT Prepared For: Lead Agency United States Department of the Interior Bureau of Land Management Las Vegas Field Office Cooperating Agency United States Department of Energy Western Area Power Administration DOE/EIS-0354 On Behalf Of: Ivanpah Energy Center, LP A Diamond Generating Corporation Company Los Angeles, California Submitted By: PARSONS MAY 2003 N-75475 N-57100 N-75476 N-75474 N-75471 N-75477 N-75895 N-75472 N-75493 Abstract Abstract Ivanpah Energy Center, L.P., a Diamond Generating Corporation Company, a subsidiary of Mitsubishi Corporation proposes to construct and operate a 500 Megawatt (MW) gas- fired electric power generating station in southern Clark County, Nevada. The facility would be known as the Ivanpah Energy Center, LP (IEC). The Environmental Impact

148

Environmental Impact Assessment (New Brunswick, Canada) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Assessment (New Brunswick, Canada) Environmental Impact Assessment (New Brunswick, Canada) Environmental Impact Assessment (New Brunswick, Canada) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Jersey Program Type Environmental Regulations Environmental Impact Assessment (EIA) is a process through which the environmental impacts potentially resulting from a proposed project are identified and assessed early in the planning process. EIA identifies steps

149

EIS-0312: Final Environmental Impact Statement, Volume 3 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0312: Final Environmental Impact Statement, Volume 3 EIS-0312: Final Environmental Impact Statement, Volume 3 EIS-0312: Final Environmental Impact Statement, Volume 3 Fish & Wildlife Implementation Plan Volume 3 In this final environmental impact statement (FEIS), with the benefit of public comment and participation, Bonneville Power Administration (BPA) has developed and proposes a Preferred Alternative (PA 2002) that substantially combines elements of the Weak Stock and Sustainable Use alternatives and that falls within the established range of potential Policy Direction alternatives. This FEIS evaluates the environmental consequences of BPA's implementation and funding of sample actions that could emerge from any of the Policy Directions. Fish & Wildlife Implementation Plan Final Environmental Impact Statement,

150

LANL Biosafety Level 3 Facility Environmental Impact Statement...  

National Nuclear Security Administration (NNSA)

Biosafety Level 3 Facility Environmental Impact Statement | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

151

The Environmental Style: Writing Environmental Assessments And Impact Statements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STYLE STYLE WRITING ENVIRONMENTAL ASSESSMENTS AND IMPACT STATEMENTS R.P. Detwiler NNSA Office of General Counsel October 2005 In his introduction to William Strunk's classic on writing, The Elements of Style, E. B. White described the plight of those who read many of our NEPA documents: Will [Strunk] felt that the reader was in serious trouble most of the time, a man foundering in a swamp, and that it was the duty of anyone attempting to write English to drain this swamp quickly and get this man on dry ground, or at least throw him a rope. In revising text, I have tried to hold steadily in mind a belief of his, this concern for the bewildered reader. The Department and its contractors need to hold in their minds the women and men - decision makers, citizens, regulators and judges - who slog through our environmental

152

Environmental Protection Agency, Environmental Impact Statements; Notice of Availability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

668 668 Federal Register / Vol. 69, No. 166 / Friday, August 27, 2004 / Notices ERP No. F-NRC-F06023-IL Dresden Nuclear Power Station, Unit 2 and 3, Supplement 17, NUREG 1437, Renewal of a Nuclear Power Plant Operating License, Grundy County, IL. Summary: EPA continues to express environmental concerns related to cooling water system impacts, and on- site waste storage. ERP No. F-NRS-E36181-TN Cane Creek Watershed Remedial Plan, Widening and Degradation of the Cane Creek Channel, Lauderdale County, TN. Summary: EPA is supportive of the efforts to improve environmental amenities within the project effect's area and, therefore, has no objection to the action as proposed. ERP No. F-USN-E11051-MS Purchase of Land in Hancock County, Mississippi, for a Naval Special

153

Occidental Geothermal, Inc. , Oxy geothermal power plant No. 1. Final environmental impact report  

DOE Green Energy (OSTI)

The project-specific environmental analysis covers the following: geology, soils, water resources, biology, air quality, noise, waste management, health, safety, transportation, energy and material resources, cultural resources, socioeconomics, public services, land use, and aesthetics. Other topics covered are: the cumulative envionmental analysis; unavoidable significant adverse environmental effects; irreversible environmental changes and irretrievable commitments of energy and materials; the relationship between local short-term uses of man's environment and the maintenance and enhancement of long-term productivity; growth-inducing impacts; and alternatives to the proposed action. (MHR)

Not Available

1981-12-01T23:59:59.000Z

154

EIS-0441: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41: Final Environmental Impact Statement 41: Final Environmental Impact Statement EIS-0441: Final Environmental Impact Statement This EIS, prepared by the Bureau of Land Management with DOE's Western Area Power Administration as a cooperating agency, evaluates the potential environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western's transmission lines. The project website is http://www.blm.gov/az/st/en/prog/energy/wind/mohave.html EIS-0441: Final Environmental Impact Statement More Documents & Publications EIS-0448: Final Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement EA-1665: Draft Environmental Assessment

155

EIS-0441: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Final Environmental Impact Statement 1: Final Environmental Impact Statement EIS-0441: Final Environmental Impact Statement This EIS, prepared by the Bureau of Land Management with DOE's Western Area Power Administration as a cooperating agency, evaluates the potential environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western's transmission lines. The project website is http://www.blm.gov/az/st/en/prog/energy/wind/mohave.html EIS-0441: Final Environmental Impact Statement More Documents & Publications EIS-0403: Final Programmatic Environmental Impact Statement EIS-0448: Final Environmental Impact Statement EA-1689: Final Environmental Assessment

156

EIS-0157: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0157: Final Environmental Impact Statement EIS-0157: Final Environmental Impact Statement EIS-0157: Final Environmental Impact Statement Lawrence Livermore National Laboratory, Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore The proposed action for the purposes of the EIS is the continued operation of LLNL and SNL, Livermore(2), including near-term (within 5 to 10 years) proposed projects. The proposed action, therefore, necessarily includes current operations plus programmatic enhancements and facility modifications pursuant to research and development missions established for the Laboratories by Congress and the President. DOE/EIS-0157, Lawrence Livermore National Laboratory, Environmental Impact Statement and Environmental Impact Report for Continued Operation of

157

EIS-0285: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0285: Draft Environmental Impact Statement Bonneville Power Administration Transmission System Vegetation Management Program This EIS evaluates the potential environmental impacts of establishing Planning Steps for managing vegetaion for specific projets. Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). EIS-0285-DEIS-1999_0.pdf More Documents & Publications Report to Congress: Corridors and Rights-of-Way on Federal Lands EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement Funding for state, city, and county governments in the state includes:

158

EIS-0372: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0372: Final Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect This Comment-Response Addendum presents the comments (and associated responses) received on the Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (DOE/EIS-0372). Together with the Draft Environmental Impact Statement (EIS) published in August 2005, these documents constitute the Final EIS for the United States (U.S.) Department of Energy's (DOE's) proposed action of amending Presidential Permit PP-89 to authorize Bangor Hydro-Electric Company (BHE) to construct its Northeast Reliability Interconnect (NRI) along the Modified Consolidated Corridors Route.

159

EIS-0353: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0353: Final Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program In cooperation with Montana, Fish, Wildlife, and Parks, Bonneville Power Administration is proposing to implement a conservation program to preserve the genetic purity of the westslope cutthroat trout populations in the South Fork of the Flathead River drainage. The South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program constitutes a portion of the Hungry Horse Mitigation Program. South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program Final Environmental Impact Statement, DOE/EIS-0353 (July 2005) More Documents & Publications EIS-0353: Draft Environmental Impact Statement

160

EIS-0333: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Impact Statement 3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement (EIS) evaluates the environmental effects of BPA's Proposed Action to execute power purchase and interconnection agreements for the purpose of acquiring up to 50 average megawatts (aMW) (up to about 200 MW) of the project developer's proposed Maiden Wind Farm. This EIS also evaluates the environmental impacts of the No Action Alternative. BPA's preferred alternative is the Proposed Action. DOE/EIS-0333, Bonneville Power Administration, Maiden Wind Farm, Final NEPA/SEPA Environmental Impact Statement, DOE/EIS-033 (January 2002) More Documents & Publications EA-1660: Final Environmental Assessment

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EIS-0345: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

345: Final Environmental Impact Statement 345: Final Environmental Impact Statement EIS-0345: Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington Plymouth Energy, L.L.C. proposes to construct and operate a 307-megawatt (MW), natural gas-fired, combined cycle power generation facility that would be interconnected with BPA's regional transmission system.This environmental impact statement (EIS) evaluates the environmental effects of the proposed project and determines if any environmental impacts would result. The environmental evaluation of the proposed project includes the proposed power generation facility, which includes the plant, gas pipeline, and water supply/wastewater pipeline; high voltage transmission interconnection; and access road. Final Environmental Impact Statement Plymouth Generating Facility Plymouth,

162

EIS-0345: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0345: Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington Plymouth Energy, L.L.C. proposes to construct and operate a 307-megawatt (MW), natural gas-fired, combined cycle power generation facility that would be interconnected with BPA's regional transmission system.This environmental impact statement (EIS) evaluates the environmental effects of the proposed project and determines if any environmental impacts would result. The environmental evaluation of the proposed project includes the proposed power generation facility, which includes the plant, gas pipeline, and water supply/wastewater pipeline; high voltage transmission interconnection; and access road. Final Environmental Impact Statement Plymouth Generating Facility Plymouth,

163

EIS-0333: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Impact Statement 3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement (EIS) evaluates the environmental effects of BPA's Proposed Action to execute power purchase and interconnection agreements for the purpose of acquiring up to 50 average megawatts (aMW) (up to about 200 MW) of the project developer's proposed Maiden Wind Farm. This EIS also evaluates the environmental impacts of the No Action Alternative. BPA's preferred alternative is the Proposed Action. DOE/EIS-0333, Bonneville Power Administration, Maiden Wind Farm, Final NEPA/SEPA Environmental Impact Statement, DOE/EIS-033 (January 2002) More Documents & Publications EA-1660: Final Environmental Assessment

164

EIS-0431: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA EPA announces the availability of the Draft Environmental Impact Statement for the Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA for public review and comment. EIS-0431-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0460: EPA Notice of Availability of Final Environmental Impact

165

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S1: Draft Supplemental Programmatic Environmental Impact S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement EIS-0236: Record of Decision DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

166

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36-S1: Draft Supplemental Programmatic Environmental Impact 36-S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

167

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final  

DOE Green Energy (OSTI)

This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

None

1999-02-01T23:59:59.000Z

168

EIS-0231: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. EIS-0231-DEIS-1996.pdf More Documents & Publications EA-1470: Final Environmental Assessment EIS-0256: Final Environmental Impact Statement

169

Modeling the Global Trade and Environmental Impacts of Biofuel Policies |  

Open Energy Info (EERE)

Modeling the Global Trade and Environmental Impacts of Biofuel Policies Modeling the Global Trade and Environmental Impacts of Biofuel Policies Jump to: navigation, search Tool Summary Name: Modeling the Global Trade and Environmental Impacts of Biofuel Policies Agency/Company /Organization: International Food Policy Research Institute Sector: Energy Focus Area: Biomass Topics: Policies/deployment programs, Co-benefits assessment, - Macroeconomic, - Environmental and Biodiversity, Pathways analysis Resource Type: Software/modeling tools, Publications, Lessons learned/best practices Website: www.ifpri.org/sites/default/files/publications/ifpridp01018.pdf RelatedTo: Modeling International Relationships in Applied General Equilibrium (MIRAGE) Modeling the Global Trade and Environmental Impacts of Biofuel Policies Screenshot

170

EIS-0332: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement (EIS) for Bonneville Power Administration's (Bonneville's) proposed McNary-John Day Transmission Line Project.This document has been prepared as an "abbreviated" final EIS pursuant to the Council on Environmental Quality's (CEQ) National Environmental Policy Act (NEPA) regulations because there have been no substantial changes to the proposed action, alternatives, or environmental analysis presented in the draft EIS for this project. McNary-John Day Transmission Line Project, Final Environmental Impact Statement, DOE/EIS-0332 (August 2002) More Documents & Publications

171

EIS-0400: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0400: Draft Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO This EIS evaluates the environmental impacts of a proposal to rebuild and upgrade the Western Area Power Administration's 12-mile Granby Pumping Plant-Windy Gap 69-kV transmission line in Grand County, Colorado. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and decided to prepare an EIS instead of completing the EA. Further information about the project is available on the project website. EIS-0400-DEIS-2012.pdf More Documents & Publications EIS-0400: Final Environmental Impact Statement EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement

172

EIS-0349: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0349: Draft Environmental Impact Statement BP Cherry Point Cogeneration Project BP West Coast Products, LLC proposes to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery. Approximately 195 acres of undeveloped land would be converted for the cogeneration facility; gas, water, wastewater, and steam pipelines; construction laydown areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic benefits of the proposed action, and identifies mitigation measures to compensate for the unavoidable impacts. Alternative

173

Totally green: evaluating and designing servers for lifecycle environmental impact  

Science Conference Proceedings (OSTI)

The environmental impact of servers and datacenters is an important future challenge. System architects have traditionally focused on operational energy as a proxy for designing green servers, but this ignores important environmental implications from ... Keywords: datacenter design, dematerialization, disaggregation, environmental sustainability, exergy, green computing, lifecycle impact, server architecture

Jichuan Chang; Justin Meza; Parthasarathy Ranganathan; Amip Shah; Rocky Shih; Cullen Bash

2012-04-01T23:59:59.000Z

174

Incorporating Biodiversity Considerations into Environmental Impact Analysis under NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Incorporating Biodiversity Considerations Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under the National Environmental Policy Act Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under the National Environmental Policy Act CouncilonEnvironmental Quality Executive Officeof thePresident 722Jackson Place, NW Washington, DC 20503 January 1993 This report presents the results of consultations by the Council on Environmental Quality (CEQ) concerning the consideration of biological diversity in analyses prepared under the National Environmental Policy Act (NEPA). This report is intended to provide background on the emerging, complex subject of biodi- versity, outline some general concepts that underlie biological diversity analysis and man-

175

EIS-0286: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0286: Final Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program The Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. The HSW EIS updates analyses of environmental consequences from previous documents and provides evaluations for activities that may be implemented consistent with the Waste Management Programmatic Environmental Impact Statement (WM PEIS) Records of Decision (RODs). EIS-0286-FEIS-01-2004.pdf EIS-0286-FEIS-02-2004.pdf EIS-0286-FEIS-03-2004.pdf EIS-0286-FEIS-FiguresTables-2004.pdf

176

EA-1801: Final Environmental Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

801: Final Environmental Impact 801: Final Environmental Impact EA-1801: Final Environmental Impact Granite Reliable Power Wind Project, Coos County, New Hampshire Granite Reliable Power, LLC, a subsidiary of Noble Environmental Power, has applied for a permit from the Department of the Army, Corps of Engineers for authorization to discharge dredged or fill materials into jurisdictional waters of the United States in connection with the proposed construction of a wind-driven electrical power generating facility in Coos County, New Hampshire. Environmental Assessment,404(b) (1) Evaluation, and Finding of No Significant Impact Granite Reliable Power Permit Application #NAE 2008-410, DOE/EA-1801 (2008) More Documents & Publications EA-1782: Final Environmental Assessment EIS-0317-S1: Environmental Impact Statement, Appendices

177

EIS-0120: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Final Environmental Impact Statement 0: Final Environmental Impact Statement EIS-0120: Final Environmental Impact Statement Waste Management Activities for Groundwater Protection Savannah River Plant, Aiken, South Carolina The U.S. Department of Energy (DOE) has prepared this environmental impact statement (EIS) to assess the environmental consequences of the implementation of modified waste management activities for hazardous, low-level radioactive, and mixed wastes for the protection of groundwater, human health, and the environment at its Savannah River Plant (SRP) in Aiken, South Carolina. This EIS, which is both programmatic and project-specific, has been prepared in accordance with Section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended. DOE/EIS-0120, Final Environmental Impact Statement Waste Management

178

EIS-0288: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0288: Final Environmental Impact Statement This Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (CLWR EIS) evaluates the environmental impacts associated with producing tritium at one or more of the following five CLWRs: (1) Watts Bar Nuclear Plant Unit 1 (Spring City, Tennessee); (2) Sequoyah Nuclear Plant Unit 1 (Soddy Daisy, Tennessee); (3) Sequoyah Nuclear Plant Unit 2 (Soddy Daisy, Tennessee); (4) Bellefonte Nuclear Plant Unit 1 (Hollywood, Alabama); and (5) Bellefonte Nuclear Plant Unit 2 (Hollywood, Alabama). Specifically, this EIS analyzes the potential environmental impacts associated with fabricating tritium-producing burnable absorber rods (TPBARs); transporting nonirradiated TPBARs from the

179

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

180

DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Final Mercury Storage Environmental Impact Statement: DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site Is Preferred for Long-Term Mercury Storage DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site Is Preferred for Long-Term Mercury Storage January 19, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON - The Department of Energy has prepared a Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement to analyze the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven locations. Based on these factors, DOE identified the Waste Control Specialists, LLC, site near Andrews, Texas, as the preferred alternative for long-term management and storage of mercury. DOE will consider the environmental impact information presented in this

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EIS-0361: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0361: Final Environmental Impact Statement Western Greenbrier Co-Production Demonstration Project The Final Environmental Impact Statement (EIS) for the Western Greenbrier Co-Production Demonstration Project provides information about the potential environmental impacts of the U.S. Department of Energy's (DOE's) proposal to provide federal financial assistance for the construction and demonstration of a 98 megawatt (MWe) net power plant and cement manufacturing facility to be located in the municipality of Rainelle, Greenbrier County, West Virginia. EIS-0361-FEIS-01-2007.pdf EIS-0361-FEIS-02-2007.pdf EIS-0361-FEIS-03-2007.pdf EIS-0361-FEIS-Figures-2007.pdf More Documents & Publications EIS-0361: Draft Environmental Impact Statement

182

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

183

EIS-0377: Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of the Draft Environmental Impact Notice of Availability of the Draft Environmental Impact Statement EIS-0377: Notice of Availability of the Draft Environmental Impact Statement Western Area Power Administration Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public review and comment. Western Area Power Administration Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement (DOE/EIS-0377) (72FR60843)(October 26, 2007) More Documents & Publications EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0183: Notice of Extension of Scoping Period

184

EIS-0423-S1: Final Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Final Supplemental Environmental Impact Statement 3-S1: Final Supplemental Environmental Impact Statement EIS-0423-S1: Final Supplemental Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury This Final SEIS supplements the January 2011 Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury. It analyzes the potential environmental impact for a facility at and in the vicinity of the Waste Isolation Pilot Plant near Carlsbad, New Mexico. The Final SEIS contains revisions and new information based in part on comments received on the draft SEIS. DOE will consider the environmental impact information presented in the January 2011 Mercury Storage EIS and this SEIS, as well as other factors when making long-term elemental mercury management and

185

EIS-0460: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Final Environmental Impact Statement 0: Final Environmental Impact Statement EIS-0460: Final Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois This EIS evaluates the potential environmental impacts of DOE's proposed action to provide approximately $1 billion in cost-shared American Recovery and Reinvestment Act funding to the FutureGen Industrial Alliance, Inc. (Alliance) to support the planning, design, construction, and operation of a prototype power plant, including the capture, conveyance, and sequestration of carbon dioxide (CO2). EIS-0460-FEIS-Summary-2013.pdf EIS-0460-FEIS-Volume1-2013.pdf EIS-0460-FEIS-Volume2-Part1-2013.pdf EIS-0460-FEIS-Volume2_Part2-2013.pdf More Documents & Publications EIS-0460: Draft Environmental Impact Statement EIS-0460: Notice of Intent to Prepare an Environmental Impact Statement

186

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

187

Department of Energy Environmental Impact Statement Public Scoping Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Environmental Impact Statement Public Scoping Department of Energy Environmental Impact Statement Public Scoping Meeting on Northern Pass Transmission Line Project Department of Energy Environmental Impact Statement Public Scoping Meeting on Northern Pass Transmission Line Project Washington, D.C. - The Department of Energy (DOE) will host seven public scoping meetings as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential nvironmental impacts from its proposed action of granting a Presidential permit to Northern Pass Transmission to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. Department of Energy Environmental Impact Statement Public Scoping Meeting

188

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

189

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

190

EIS-0447: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. EIS-0447-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement

191

EIS-0288: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0288: Draft Environmental Impact Statement This Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (CLWR EIS) evaluates the environmental impacts associated with producing tritium at one or more of the following five CLWRs: (1) Watts Bar Nuclear Plant Unit 1 (Spring City, Tennessee); (2) Sequoyah Nuclear Plant Unit 1 (Soddy Daisy, Tennessee); (3) Sequoyah Nuclear Plant Unit 2 (Soddy Daisy, Tennessee); (4) Bellefonte Nuclear Plant Unit 1 (Hollywood, Alabama); and (5) Bellefonte Nuclear Plant Unit 2 (Hollywood, Alabama). Specifically, this EIS analyzes the potential environmental impacts associated with fabricating tritium-producing burnable absorber rods (TPBARs); transporting nonirradiated TPBARs from the

192

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Final Environmental Impact Statement - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

193

EIS-0279: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

279: Final Environmental Impact Statement 279: Final Environmental Impact Statement EIS-0279: Final Environmental Impact Statement Spent Nuclear Fuel Management, Aiken, South Carolina The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. DOE/EIS-0279, Department of Energy, Savannah River Site, Spent Nuclear Fuel Management Final Environmental Impact Statement, Summary, Aiken, South Carolina (March 2000) EIS-0279-FEIS-01-2000.pdf EIS-0279-FEIS-02-2000.pdf More Documents & Publications EIS-0279: Record of Decision EIS-0279: Notice of Intent to Prepare an Environmental Impact Statement

194

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

195

EIS-0355: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0355: Final Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198, October 1996). The

196

EIS-0280: Notice of Cancellation of Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cancellation of Environmental Impact Statement Cancellation of Environmental Impact Statement EIS-0280: Notice of Cancellation of Environmental Impact Statement Clean Power From Integrated Coal/ Ore Reduction Project, Provo, Utah The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a proposal by Geneva Steel Company to design, construct, and operate a project known as the Clean Power from Integrated Coal/Ore Reduction (CPICOR) Project near Provo, Utah. DOE/EIS-0280, Department of Energy, Notice of Cancellation of Environmental Impact Statement process for the Clean Power From Integrated Coal/ Ore Reduction (CPICOR) Project, Provo, Utah (October 2004) More Documents & Publications EIS-0282: Notice of Cancellation of the Environmental Impact Statement

197

National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

DOE Green Energy (OSTI)

This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial settlement of the lawsuit Civ. No. 97-936 (SS) (D.D.C.), ''Natural Resources Defense Council [NRDC] et al. v. Richardson et al.'' The Joint Stipulation and Order is reproduced at the end of this document as Attachment 1. In the Joint Stipulation and Order, the U.S. Department of Energy (DOE) agreed to prepare an SEIS to the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (SSM PEIS) (DOE/EIS-0236, DOE 1996a) to evaluate the reasonably foreseeable significant adverse environmental impacts of continuing to construct and of operating the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) in Livermore, California, with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials. On September 25, 1998, DOE announced in the ''Federal Register'' the agency's intent to prepare this SEIS for the NIF portion (Volume III, Appendix I) of the SSM PEIS. DOE's need for preparation of this SEIS, consistent with the previously established need for NIF (DOE 1996a, Appendix I), is to determine how the results of characterization studies completed pursuant to the Joint Stipulation and Order should affect the manner in which DOE proceeds with the construction and operation of NIF. On August 5, 1999, DOE issued an amended Notice of Intent to prepare this SEIS, which incorporated changes in schedule resulting from new relevant information. The SSM PEIS addressed alternative plans for DOE's defense program activities related to nuclear weapons stockpile issues at several DOE laboratories, including LLNL. The environmental consequences of construction and operation of NIF were addressed in detail in SSM PEIS Volume III, Appendix I, entitled ''National Ignition Facility Project Specific Analysis'' (NIF PSA). The Record of Decision (ROD) for the SSM PEIS was published in the ''Federal Register'' on December 26, 1996 (61 FR 68014). In the ROD, DOE announced its decision to construct and operate NIF at LLNL. The NIF is an experimental facility that would use laser light to initiate a fusion reaction in very small quantities of hydrogen by a process known as inertial confinement fusion. The start of physical construction of NIF was authorized on March 7, 1997, and groundbreaking for the NIF occurred on May 29, 1997. Construction of the NIF is ongoing; the conventional facilities are over 94% complete and are expected to be completed in late 2001.

N /A

2001-02-23T23:59:59.000Z

198

Reducing the environmental impact of uranium in-situ recovery.  

Science Conference Proceedings (OSTI)

This session will explore the current technical approaches to reducing the environmental effects of uranium ISR in comparison to the historical environmental impact of uranium mining to demonstrate advances in this controversial subject.

Siegel, Malcolm Dean; Simmons, Ardyth

2010-10-01T23:59:59.000Z

199

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1994/01_cover.html[6/27/2011 11:57:49 AM] 1994/01_cover.html[6/27/2011 11:57:49 AM] Final Environmental Impact Statement (DOE/eis-0194) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: Tenaska Washington II Generation Project State Involved: Washington Abstract: BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson

200

EIS-0383: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding for construction and operation of facilities at Orlando Utilities Commission's (OUC's) existing Stanton Energy Center near Orlando, Florida. The project has been selected for further consideration by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC) technology. Although DOE funding would support only the Orlando Gasification Project (i.e., coal gasifier, synthesis gas cleanup systems, and supporting infrastructure),

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Advance Notice of Intent To Prepare an Environmental Impact Statement...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Hazardous Waste (DOEEIS-0200- F, May 1997); Disposition of Surplus Highly Enriched Uranium, Final Environmental Impact Statement (DOE EIS-0240, June 1996);...

202

Notice of Intent to Prepare a Programmatic Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Intent To Prepare a Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership AGENCY: Department of Energy. ACTION: Notice of Intent....

203

EIS-0096: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

096: Final Environmental Impact Statement 096: Final Environmental Impact Statement EIS-0096: Final Environmental Impact Statement Remedial Actions at the Former Vitro Rare Metals Plant Site, Canonsburg, Washington County, Pennsylvania This Canonsburg FEIS evaluates the environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington county, Pennsylvania. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be an approximately 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property,

204

Notice of Intent to Prepare an Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OF ENERGY Notice of Intent to Prepare an Environmental Impact Statement for Decommissioning andor Long-Term Stewardship at the West Valley Demonstration Project and Western...

205

EIS-0491: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

environmental impacts of a proposal to expand an existing liquefied natural gas (LNG) import terminal in Calcasieu Parish, Louisiana, by constructing and operating natural...

206

EIS-0312: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0312: Notice of Intent to Prepare an Environmental Impact Statement Fish and Wildlife Implementation Plan for the Bonneville Power Administration Throughout the...

207

EIS-0271: Notice of Intent To Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Intent To Prepare an Environmental Impact Statement Construction and Operation of a Tritium Extraction Facility at the Savannah River Site The Department of Energy (DOE)...

208

Updated Uranium Fuel Cycle Environmental Impacts for Advanced Reactor Designs  

Science Conference Proceedings (OSTI)

The purpose of this project was to update the environmental impacts from the uranium fuel cycle for select advanced (GEN III+) reactor designs.

Nitschke, R.

2004-10-03T23:59:59.000Z

209

FAQ 38-What are the potential environmental impacts from continued...  

NLE Websites -- All DOE Office Websites (Extended Search)

continued storage of depleted uranium hexafluoride? What are the potential environmental impacts from continued storage of depleted uranium hexafluoride? In addition to human...

210

FAQ 41-What are the potential environmental impacts from manufacture...  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental impacts from manufacture of depleted uranium shielded casks? In addition to human health and safety consequences, the PEIS evaluated the potential consequences of...

211

EPA Notice of Availability of the Final Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROTECTION AGENCY ER-FRL-6658-6 Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202)...

212

EIS-0478: Draft Environmental Impact Statement | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental impacts of a RUS propoal to construct, operate, and maintain a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area...

213

EIS-0447: Draft Environmental Impact Statement | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Inc U.S. Department of Energy Press Release: DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project, June 30, 2010....

214

EIS-0447: DOE Notice of Availability of Draft Environmental Impact...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to...

215

EIS-0294: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Intent to Prepare an Environmental Impact Statement Proposed Sutter Power Plant and Transmission Line Project, Calpine County, California Western Area Power...

216

Final Environmental Impact Report: North Brawley Ten Megawatt...  

Open Energy Info (EERE)

Number NA DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Final Environmental Impact Report: North Brawley Ten Megawatt Geothermal...

217

EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to maintain the safety, security, and reliability of the United States' nuclear weapons stockpile. This Complex Transformation Supplemental Programmatic Environmental Impact...

218

DOE Hydrogen Analysis Repository: Environmental Impacts of Hydrogen  

NLE Websites -- All DOE Office Websites (Extended Search)

Full Title: Evaluation of the Potential Environmental Impacts from Large-Scale Use and Production of Hydrogen in Energy and Transportation Applications Project ID: 247 Principal...

219

Agencies Publish Final Environmental Impact Statement on Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC...

220

EIS-0442: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Intent to Prepare an Environmental Impact Statement Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on...

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EIS-0447: EPA Notice of Availability of Draft Environmental Impact...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to...

222

EIS-0367: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0367: Notice of Intent to Prepare an Environmental Impact Statement Bonneville Power Administration Transmission Policy Bonneville Power Administration (BPA) proposes to...

223

EIS-0285: Final Environmental Impact Statement, Volume 2 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volume 2 EIS-0285: Final Environmental Impact Statement, Volume 2 Bonneville Power Administration Transmission System Vegetation Management Program Volume 2: Appendices Appendix A...

224

Final Supplemental Environmental Impact Statement for a Geologic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Nevada Rail Transportation Corridor DOEEIS-0250F-S2 and Final Env Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear...

225

Environmental Impacts of Plug-in Hybrid Electric Vehicles.  

E-Print Network (OSTI)

??The environmental and electric utility system impacts from plug?in hybrid electric vehicle (PHEV) infiltration in Michigan were examined from years 2010 to 2030 as part… (more)

Camere, Aaron; Schafer, Allison; de Monasterio, Caroline

2010-01-01T23:59:59.000Z

226

EIS-0391: Supplement Analysis of an Environmental Impact Statement...  

NLE Websites -- All DOE Office Websites (Extended Search)

of an Environmental Impact Statement Draft Tank Closure and Waste Management for the Hanford Site, Richland, WA Based on the analyses in this SA, DOE concluded that updated,...

227

EIS-0489: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0489: Notice of Intent to Prepare an Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, Oregon) and Pacific Connector Pipeline Project...

228

EIS-0226: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEEIS-0226, Notice of Intent to Prepare an Environmental Impact Statement for Decommissioning andor Long-Term Stewardship at the West Valley Demonstration Project and Western...

229

EIS-0447: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings Champlain Hudson Power Express Transmission Line Project, New York Notice of Intent To Prepare an...

230

Environmental impacts during geothermal development: Some examples from Central America  

DOE Green Energy (OSTI)

The impacts of geothermal development projects are usually positive. However, without appropriate monitoring plans and mitigation actions firmly incorporated into the project planning process, there exists the potential for significant negative environmental impacts. The authors present five examples from Central America of environmental impacts associated with geothermal development activities. These brief case studies describe landslide hazards, waste brine disposal, hydrothermal explosions, and air quality issues. Improved Environmental Impact Assessments are needed to assist the developing nations of the region to judiciously address the environmental consequences associated with geothermal development.

Goff, S.; Goff, F.

1997-04-01T23:59:59.000Z

231

EIS-0455: Notice of Adoption of an Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0455: Notice of Adoption of an Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA 2010-31793.pdf More Documents & Publications...

232

EIS-0454: Notice of Adoption of an Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0454: Notice of Adoption of an Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project Notice of Adoption of the Tonopah Solar...

233

Environmental impact directory system: preliminary implementation for geothermal energy  

DOE Green Energy (OSTI)

An Environmental Impact Directory System (EIDS) was proposed as a method for a computerized search of the widely distributed data files and models pertaining to energy-related environmental effects. To define the scope and content of the system, an example was prepared for the case of geothermal energy. The resulting sub-directory is known as GEIDs (Geothermal Environmental Impact Directory System). In preparing or reviewing an Environmental Impact Statement (EIS), the user may employ GEIDS as an extensive checklist to make sure he has taken into account all predictable impacts at any level of severity.

Hess, F.D.; Hall, R.T.; Fullenwider, E.D.

1976-07-01T23:59:59.000Z

234

EIS-0317-S1: Environmental Impact Statement, Maps and Figures...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement, Maps and Figures Kangley-Echo Lake Transmission Line Project Maps and Figures Bonneville Power Administration is proposing to build a new...

235

EIS-0229: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0229: Notice of Intent to Prepare an Environmental Impact Statement Surplus Plutonium Disposition The Department of Energy (DOE) announces its intent to prepare an...

236

EIS-0350-S1: Final Supplemental Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico...

237

EIS-0350-S1: Supplemental Environmental Impact Statement for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico...

238

EIS-0250-S1: Draft Supplemental Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada DOE's...

239

Final Supplemental Environmental Impact Statement for a Geologic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada -...

240

Sandia National Laboratories Site-Wide Environmental Impact Statement...  

National Nuclear Security Administration (NNSA)

Site-Wide Environmental Impact Statement | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency...

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

NNSS Final Site-Wide Environmental Impact Statement (SWEIS) ...  

National Nuclear Security Administration (NNSA)

NNSS Final Site-Wide Environmental Impact Statement (SWEIS) | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

242

EIS-0361: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USC 4321 et seq.), to evaluate the potential environmental impacts associated with the construction and demonstration of a 98-megawatt (MWe) net power plant and cement...

243

EIS-0445: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0445: Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia This EIS evaluates the...

244

EIS-0426: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement Continued Operation of the Department of EnergyNational Nuclear Security Administration Nevada Test Site and Off-Site Locations in the State of...

245

Fuel Source and Environmental Impact Disclosure (Vermont) | Open...  

Open Energy Info (EERE)

suppliers to disclose information on fuel sources and the environmental impacts of electricity generation. Vermont's disclosure standards may address label forms and information...

246

EIS-0465: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Prepare an Environmental Impact Statement Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware Notice of Intent To...

247

EIS-0297: Notice of Intent To Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0297: Notice of Intent To Prepare an Environmental Impact Statement Proposed Griffith Power Plant and Transmission Line Project, Mohave County, AZ Western Area Power...

248

EIS-0435: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Notice of Intent to prepare an environmental impact statement for Western...

249

EIS-0461: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scoping Meetings Interconnection of the Proposed Hyde County Wind Energy Center Project, South Dakota Notice of Intent to Prepare an Environmental Impact Statement and to Conduct...

250

EIS-0418: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Intent to Prepare an Environmental Impact Statement Proposed PrairieWinds Project, South Dakota Notice of Intent for the Western Area Power Administration and Department of...

251

EIS-0281: Final Site-Wide Environmental Impact Statement | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Site-Wide Environmental Impact Statement Sandia National LaboratoriesNew Mexico DOE proposes to continue operating the Sandia National LaboratoriesNew Mexico (SNL...

252

Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.  

SciTech Connect

BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

253

Maiden Wind Farm Draft Environmental Impact Statement  

SciTech Connect

In February 2001, Washington Winds Inc. (the project developer) submitted a proposal to Bonneville Power Administration (BPA) for a site north of the cities of Sunnyside and Prosser in Washington where wind power facilities could be developed. After considering preliminary information, BPA decided to examine the proposed project and consider purchasing and transmitting power from the project. The project developer also submitted Conditional use Permit (CUP) applications to Benton and Yakima Counties. Benton County, serving as the lead agency for the State Environmental Policy Act (SEPA), issued a Determination of Significance on June 11, 2001. The action proposed by BPA is to: (1) execute a 20-year power purchase agreement with the project developer for up to 50 average megawatts (aMW) (up to about 200 megawatts [MW]) of electrical energy from the proposed Maiden Wind Farm; and (2) execute construction and generation interconnection agreements with the project developer to integrate the power generated by the proposed Maiden Wind Farm into BPA's transmission system. The need for the proposed action arises primarily from BPA's statutory obligations and planning directives. BPA will consider the information in this Environmental Impact Statement (EIS), public comments, and other factors when deciding whether to purchase power from the proposed wind project and transmit it over BPA transmission lines. Benton and Yakima County Planning Departments will consider information in this EIS when deciding whether to grant a CUP and allow the proposed project to be developed.

N /A

2002-03-29T23:59:59.000Z

254

Condon Wind Project Draft Environmental Impact Statement  

DOE Green Energy (OSTI)

BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource acquisition strategy; and meeting the objectives of its Power Business Line's Strategic Plan. The Draft Environmental Impact Statement (DEIS) evaluates the environmental impacts of the Proposed Action (to execute one or more power purchase and transmission services agreements to acquire and transmit up to the full electric output of the proposed Condon Wind Project) and the No Action Alternative. BPA's preferred alternative is the Proposed Action. BPA has also identified the Proposed Action as the environmentally-preferred alternative. The proposed wind project is located on private agricultural land in Gilliam County, Oregon. The 38-acre project site is located within a 4,200-acre study area located on both sides of Oregon Highway 206, approximately 5 miles northwest of the town of Condon. The project would use modern, efficient 600-kilowatt (kW) wind turbines to convert energy in the winds to electricity that would be transmitted over the existing BPA transmission system. The project would consist of one or two phases: the first phase would use 41 wind turbines to yield a capacity of approximately 24.6 megawatts (MW). A second phase (if built) would use 42 wind turbines to yield a capacity of approximately 25.2 MW. For purposes of this DEIS, the size of the project is assumed to be 49.8 MW, built in two phases. Major components of the wind project include wind turbines and foundations, small pad-mounted transformers, an operation and maintenance building, power collection and communication cables, project access roads, meteorological towers on foundations, and a substation. During construction there would also be temporary equipment storage and construction staging areas. The first phase is proposed for construction in late 2001; the second phase could be constructed during spring/summer 2002 or later.

N /A

2001-06-01T23:59:59.000Z

255

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources.

NONE

1995-11-01T23:59:59.000Z

256

EIS-0426: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Final Environmental Impact Statement 6: Final Environmental Impact Statement EIS-0426: Final Environmental Impact Statement This Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (NNSS SWEIS) analyzed the potential environmental impacts of proposed alternatives for continued management and operation of the Nevada National Security Site (NNSS) (formerly known as the Nevada Test Site) and other U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)-managed sites in Nevada, including the Remote Sensing Laboratory (RSL) on Nellis Air Force Base in North Las Vegas, the North Las Vegas Facility (NLVF), the Tonopah Test Range (TTR), and environmental

257

EIS-0450: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies for the environmental review, also announce the availability of the Draft EIS. EIS-0450-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0464: EPA Notice of Availability of Final Environmental Impact

258

EIS-0284: Notice of Cancellation of Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Cancellation of Environmental Impact Statement Notice of Cancellation of Environmental Impact Statement EIS-0284: Notice of Cancellation of Environmental Impact Statement Implementation of the Low-Emission Boiler System (LEBS) Proof-of-Concept System, Elkhart, Illinois The Department of Energy (DOE) is cancelling the preparation of an Environmental Impact Statement (EIS) under the National Environmental Policy Act (NEPA) for a proposal by Babcock Borsig Power to design, construct, and operate an advanced pulverized coal-fired power facility using a low emission boiler system (LEBS) at Elkhart, Illinois. DOE/EIS-0284, Notice of Cancellation of Environmental Impact Statement for Implementation of the Low-Emission Boiler System (LEBS) Proof-of-Concept System, Elkhart, Illinois, 73 FR 11101 (February 2008)

259

EIS-0394: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0394: Final Environmental Impact Statement FutureGen Project The Final Environmental Impact Statement (EIS) for the potential environmental impacts of the U.S. Department of Energy's (DOE's) proposal to provide federal funding to the FutureGen Alliance, Inc. (Alliance) for the FutureGen Project. In a March 2004 Report to Congress, DOE estimated the cost of the project at $950 million in constant 2004 dollars shared at a 74/26 ratio by DOE and the Alliance. Accounting for escalation, based on representative industry indices, the project is currently estimated to cost $1.757 billion in as-spent dollars. The cost estimate will be updated as work progresses. The Final EIS provides an evaluation of the environmental consequences that may result from the

260

EIS-0287: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0287: Draft Environmental Impact Statement Idaho High-Level Waste & Facilities Disposition This EIS evaluates the potential environmental impacts of managing two waste types at the Idaho National Engineering and Environmental Laboratory, namely, high-level waste in a calcine form and liquid mixed transuranic waste (historically know as sodium bearing waste and newly generated liquid waste). It also analyzes the disposition of existing and proposed high-level waste facilities after their missions have been completed. EIS-0287-DEIS-1999.pdf EIS-0287-DEIS-Figures-1999.pdf More Documents & Publications EIS-0287: Final Environmental Impact Statement EIS-0287: Idaho High-Level Waste and Facilities Disposition Final

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EIS-0259: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0259: Final Environmental Impact Statement EIS-0259: Final Environmental Impact Statement EIS-0259: Final Environmental Impact Statement Disposal of Decommissioned, Defueled Cruiser, Ohio Class, Los Angeles and Class Naval Reactor Plants This Environmental Impact Statement analyzes the alternate ways for disposing of decommissioned, defieled reactor compliments from U.S. Navy nuclear-powered cruisers, (Bainbridge, Truxtun, Long Beach, California Class and Virginia Class) and Los Angeles Class, and Ohio Class submarines. Final Environmental Impact Statement on the Disposal of Decommissioned, Defueled Cruiser, Ohio Class, Los Angeles and Class Naval Reactor Plants, DOE/EIS-0259 (April 1996) EIS-0259-FEIS-01-1996_0.pdf EIS-0259-FEIS-02-1996_0.pdf More Documents & Publications EA-1889: Final Environmental Assessment and Finding of No Significant

262

EIS-0462: Notice of Cancellation of an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cancellation of an Environmental Impact Cancellation of an Environmental Impact Statement EIS-0462: Notice of Cancellation of an Environmental Impact Statement Proposed Crowned Ridge Wind Energy Center Project, Codington and Grant Counties, SD The U.S. Department of Energy (DOE), Western Area Power Administration (Western) is issuing this notice to advise the public that it is cancelling the preparation of an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA) on an interconnection request by NextEra Energy Resources (NextEra). Notice of Cancellation of Environmental Impact Statement for the Proposed Crowned Ridge Wind Energy Center Project, Codington and Grant Counties, SD, EIS-0462 (July 2011) (76 FR 40354) More Documents & Publications EIS-0380: Amended Record of Decision

263

DOE Environmental Impact Statement Public Scoping Meeting on Champlain  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Environmental Impact Statement Public Scoping Meeting on DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project June 30, 2010 - 3:28pm Addthis Washington, D.C. --The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York.

264

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

265

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

266

EIS-0312: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish & Wildlife Implementation Plan In this final environmental impact statement (FEIS), with the benefit of public comment and participation, BPA has developed and proposes a Preferred Alternative (PA 2002) that substantially combines elements of the Weak Stock and Sustainable Use alternatives and that falls within the established range of potential Policy Direction alternatives. This FEIS evaluates the environmental consequences of BPA's implementation and funding of sample actions that could emerge from any of the Policy Directions. Fish & Wildlife Implementation Plan Final Environmental Impact Statement, DOE/EIS-0312 (April 2003) EIS-0312-FEIS-02-2003.pdf EIS-0312-FEIS-03-2003.pdf

267

FAO-Environmental Impact Statement Guidelines | Open Energy Information  

Open Energy Info (EERE)

FAO-Environmental Impact Statement Guidelines FAO-Environmental Impact Statement Guidelines Jump to: navigation, search Tool Summary Name: FAO-Environmental Impact Statement Guidelines Agency/Company /Organization: Food and Agriculture Organization of the United Nations Sector: Land Focus Area: Agriculture, Forestry Topics: Co-benefits assessment, - Environmental and Biodiversity Resource Type: Guide/manual Website: www.fao.org/docrep/014/am862e/am862e00.pdf References: FAO-Environmental Impact Statement Guidelines[1] "This publication provides guidelines for all FAO units (headquarters departments and offices, as well as decentralized offices) to undertake environmental impact assessments (EIA) of field projects. The use of these guidelines apply to all FAO field projects and activities, as further

268

EIS-0394: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

94: Final Environmental Impact Statement 94: Final Environmental Impact Statement EIS-0394: Final Environmental Impact Statement FutureGen Project The Final Environmental Impact Statement (EIS) for the potential environmental impacts of the U.S. Department of Energy's (DOE's) proposal to provide federal funding to the FutureGen Alliance, Inc. (Alliance) for the FutureGen Project. In a March 2004 Report to Congress, DOE estimated the cost of the project at $950 million in constant 2004 dollars shared at a 74/26 ratio by DOE and the Alliance. Accounting for escalation, based on representative industry indices, the project is currently estimated to cost $1.757 billion in as-spent dollars. The cost estimate will be updated as work progresses. The Final EIS provides an evaluation of the environmental consequences that may result from the

269

Sacramento Area Voltage Support Driaft Supplement Environmental Impact Statement and Environmental Impact Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sacramento Area Voltage Support Draft SEIS/EIR * Western Area Power Administration * Sierra Nevada Region Sacramento Area Voltage Support Draft SEIS/EIR * Western Area Power Administration * Sierra Nevada Region A-1 APPEN DIX A Alternatives Development A.1 INTRODUCTION Appendix A summarizes the process used to identify and screen project alternatives for the joint, draft Supplemental Environmental Impact Statement and Environmental Impact Report (Sacramento Area Voltage Support (SVS) Draft SEIS and EIR). Public involvement was used to develop and refine alternatives. Engineering considerations were the primary factor in eliminating several alternatives. A.2 ALTERNATIVES SELECTED FOR DETAILED ANALYSIS Western Area Power Administration (Western), Sacramento Municipal Utility District (SMUD), and the City of Roseville (Roseville) identified three transmission line segments between Western's

270

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments  

SciTech Connect

This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

None

1999-02-01T23:59:59.000Z

271

Environmental impact assessment (EIA) guidance for developers...  

NLE Websites -- All DOE Office Websites (Extended Search)

the consideration of environmental issues in the planning, design, deployment and decommissioning of test devices and to summarise the results of this process in an Environmental...

272

Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement  

Science Conference Proceedings (OSTI)

In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

Not Available

1994-01-01T23:59:59.000Z

273

Survey of Impacts of Environmental Controls on Plant Heat Rate  

Science Conference Proceedings (OSTI)

Environmental controls for sulfur and nitrogen oxides, particulates, mercury, and other pollutants reduce the efficiency of power plants. This report documents the impacts of state-of-the-art environmental controls on power plant heat rate and identifies ways these impacts may be reduced through operating and design changes.

2009-12-07T23:59:59.000Z

274

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.  

Science Conference Proceedings (OSTI)

BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

275

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.  

DOE Green Energy (OSTI)

This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

276

EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S4: Final Supplemental Programmatic Environmental Impact S4: Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), an agency within the Department of Energy, has the responsibility to maintain the safety, security, and reliability of the United States' nuclear weapons stockpile. This Complex Transformation Supplemental Programmatic Environmental Impact Statement (SPEIS) analyzes the potential environmental impacts of reasonable alternatives to continue transformation of the nuclear weapons complex to be smaller, and more responsive, efficient, and secure in order to meet national security requirements. EIS-0236-S4_FEIS_summary-2008.pdf EIS-0236-S4_FEIS_vol1-2008.pdf

277

EIS-0442: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

2: EPA Notice of Availability of Draft Environmental Impact 2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EPA announces the availability of the Draft Environmental Impact Statement for the Reauthorization of Permits, Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System Lands, Colorado, Utah, and Nebraska. EIS-0442-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0389: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental

278

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: Supplemental Draft Environmental Impact Statement 77: Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

279

EIS-0382: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 606 megawatts of electricity (MWe) for export to the electrical grid, 1,212 MWe total. DOE's Proposed Action is to provide a total of $36 million in co-funding, through a

280

EIS-0362: Notice of Cancellation of the Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Notice of Cancellation of the Environmental Impact 2: Notice of Cancellation of the Environmental Impact Statement EIS-0362: Notice of Cancellation of the Environmental Impact Statement Colorado Springs Utilities Next-Generation CFB Coal Generating Unit, Fountain, Colorado The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a proposal by Colorado Springs Utilities (CSU) to design, construct, and operate a project known as the Next- Generation Circulating Fluidized Bed (CFB) Coal Generating Unit near Fountain, El Paso County, Colorado. DOE/EIS-0362, Department of Energy, Notice of Cancellation of the Environmental Impact Statement for the Colorado Springs Utilities Next-Generation CFB Coal Generating Unit, Fountain, Colorado, 69 FR 62440, (October 2004)

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIS-0442: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah This Draft EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. It evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx EIS-0442: Draft Environmental Impact Statement More Documents & Publications

282

EIS-0416: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0416: Final Environmental Impact Statement Ivanpah Solar Electric Generating System The Bureau of Land Management (BLM) has received a proposal from Solar Partners I, II, IV, and VIII, limited liability corporations formed by BrightSource Energy (BrightSource), to construct and operate a solar thermal electric generating facility in San Bernardino County, California. The project would generate up to 400 megawatts (MW) of electricity using solar thermal technology. California Desert Conservation Area Plan Amendment/Final Environmental Impact Statement for Ivanpah Solar Electric Generating System, DOE/EIS-0416 (July 2010) More Documents & Publications EIS-0416: Record of Decision EIS-0354: Draft Environmental Impact Statement, Summary

283

EIS-0464: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0464: Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts associated with the Department of Energy's (DOE's) proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration (CCS) project. DOE's proposed action would provide financial assistance to Leucadia under the Industrial Carbon Capture and Sequestration (ICCS) Program to support construction and operation of Leucadia's Lake Charles CCS project. DOE proposes to provide Leucadia with up to $261.4 million, which would constitute about 60

284

EIS-0377: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system EIS-0377-FEIS-Summary-2009.pdf EIS-0377-FEIS-01-2009.pdf EIS-0377-FEIS-02-2009.pdf EIS-0377-FEIS-03-2009.pdf EIS-0377-FEIS-04-2009.pdf More Documents & Publications EIS-0377: Notice of Intent to Prepare an Environmental Impact Statement EIS-0377: DOE Notice of Availability of the Draft Environmental Impact

285

EIS-0282: Notice of Cancellation of the Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Notice of Cancellation of the Environmental Impact 2: Notice of Cancellation of the Environmental Impact Statement EIS-0282: Notice of Cancellation of the Environmental Impact Statement McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a proposal by the City of Lakeland to design, construct, and operate a project known as the McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project in Lakeland, Florida. DOE selected the City of Lakeland's proposal for further consideration under DOE's Clean Coal Technology Demonstration Program competitive solicitation. DOE/EIS-0202, Notice of Cancellation of the Environmental Impact Statement for the McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration

286

EIS-0236-S1: Supplemental Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: Supplemental Environmental Impact Statement -S1: Supplemental Environmental Impact Statement EIS-0236-S1: Supplemental Environmental Impact Statement Stockpile Stewardship and Management This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial settlement of the lawsuit Civ. No. 97-936 (SS) (D.D.C.), Natural Resources Defense Council [NRDC] et al. v. Richardson et al. The Joint Stipulation and Order is reproduced at the end of this document as Attachment 1. In the Joint Stipulation and Order, the U.S. Department of Energy (DOE) agreed to prepare an SEIS to the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (SSM PEIS) (DOE/EIS-0236, DOE 1996a) to evaluate the reasonably

287

EIS-0357: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0357: Final Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project, Gilberton, Pennsylvania This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action to provide cost-shared funding for construction and operation of facilities near Gilberton, Pennsylvania, which have been proposed by WMPI PTY, LLC, for producing electricity, steam, and liquid fuels from anthracite coal waste (culm). The project has been selected by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate the integration of coal waste gasification and Fischer-Tropsch (F-T) synthesis of liquid hydrocarbon fuels at commercial scale.

288

EIS-0226: Revised Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Impact Statement 6: Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in this EIS is intended to assist DOE and NYSERDA with the consideration of environmental impacts

289

Draft Environmental Impact Statement Available for Public Review |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced the issuance of the Draft Environmental Impact Statement (EIS) for the West Valley Demonstration Project in western New York, naming Phased Decisionmaking as the Preferred Alternative. Issuance of this Draft EIS is a significant step forward in cleaning up the site. The document, entitled "Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226-D (Revised)), is a revision of the 1996 Cleanup and Closure

290

EIS-0319: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

319: Draft Environmental Impact Statement 319: Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated relocateing the TA-18 security Category I/II capabilities and materials to new locations: 1) different site at LANL (the preferred alternative) at Los Alamos, New Mexico; 2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; 3) the Nevada Test Site near Las Vegas; and 4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS analyzes upgrading of the TA-18 facilities at LANL. EIS-0319-DEIS-2001.pdf More Documents & Publications EIS-0319: Final Environmental Impact Statement EIS-0319: Record of Decision EIS-0236-S4: Final Supplemental Programmatic

291

EIS-0427: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona This EIS evaluates the environmental impacts of a proposed wind energy generation project in Coconino County, Arizona, on privately owned ranch lands and trust lands administered by the Arizona State Land Department. The proposed project includes a new transmission tie-line that would cross lands administered by Coconino National Forest and interconnect with DOE's Western Area Power Administration's existing Glen Canyon-Pinnacle Peak transmission lines. EIS-0427-FEIS-Volume1-2012.pdf EIS-0427-FEIS-Volume2-2012.pdf More Documents & Publications EIS-0427: Draft Environmental Impact Statement EIS-0427: Record of Decision

292

EIS-0444: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0444: Final Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This final environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project (TCEP). The TCEP would use coal-based integrated gasification combined-cycle technology to generate electric power and would capture carbon dioxide (CO2) for use in enhanced oil recovery (EOR) and eventual sequestration. The plant would generate 400 megawatts (gross) of

293

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Draft Environmental Impact Statement Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

294

Interagency Collaboration to Address Environmental Impacts of Shale Gas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interagency Collaboration to Address Environmental Impacts of Shale Interagency Collaboration to Address Environmental Impacts of Shale Gas Drilling Interagency Collaboration to Address Environmental Impacts of Shale Gas Drilling April 23, 2013 - 12:06pm Addthis Dr. John Howard (right), Director of NIOSH and Dr. Anthony Cugini (left), Director of NETL announced the establishment of a research partnership to evaluate the environmental impacts of shale gas drilling. Dr. John Howard (right), Director of NIOSH and Dr. Anthony Cugini (left), Director of NETL announced the establishment of a research partnership to evaluate the environmental impacts of shale gas drilling. Washington, DC - A memorandum of understanding to perform collaborative research related to airborne emissions and air quality at natural gas drilling sites has been signed by the Office of Fossil Energy's National

295

EIS-0357: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57: Final Environmental Impact Statement 57: Final Environmental Impact Statement EIS-0357: Final Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project, Gilberton, Pennsylvania This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action to provide cost-shared funding for construction and operation of facilities near Gilberton, Pennsylvania, which have been proposed by WMPI PTY, LLC, for producing electricity, steam, and liquid fuels from anthracite coal waste (culm). The project has been selected by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate the integration of coal waste gasification and Fischer-Tropsch (F-T) synthesis of liquid hydrocarbon fuels at commercial scale.

296

EIS-0464: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0464: Final Environmental Impact Statement Lake Charles Carbon capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This Final Environmental Impact Statement provides information about the potential environmental impacts associated with the Department of Energy's proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration (CCS) project. DOE's proposed action would provide financial assistance to Leucadia under the Industrial Carbon Capture Sequestration Program to support construction and operation of Leucadia's Lake Charles CCS project. DOE proposes to provide Leucadia with up to $261.4 million, which would constitute about 60 percent of the

297

Final Environmental Impact Report: North Brawley Ten Megawatt Geothermal  

Open Energy Info (EERE)

Final Environmental Impact Report: North Brawley Ten Megawatt Geothermal Final Environmental Impact Report: North Brawley Ten Megawatt Geothermal Demonstration Facility Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Final Environmental Impact Report: North Brawley Ten Megawatt Geothermal Demonstration Facility Abstract N/A Author County of Imperial Planning Department Published WESTEC SERVICES, INC., 1979 Report Number N/A DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Final Environmental Impact Report: North Brawley Ten Megawatt Geothermal Demonstration Facility Citation County of Imperial Planning Department. 1979. Final Environmental Impact Report: North Brawley Ten Megawatt Geothermal Demonstration Facility. (!) : WESTEC SERVICES, INC.. Report No.: N/A. Retrieved from

298

EIS-0476: Notice of Adoption of Final Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76: Notice of Adoption of Final Environmental Impact 76: Notice of Adoption of Final Environmental Impact Statement EIS-0476: Notice of Adoption of Final Environmental Impact Statement Vogtle Electric Generating Plant, Units 3 and 4, Issuance of a Loan Guarantee to Support Funding for Construction, Burke County, GA The Department of Energy has adopted the Nuclear Regulatory Commission's FEIS 20080322 filed 08/15/2008 and FSEIS 20110088 filed 03/18/2011. DOE was not a Cooperating Agency on the above FEIS and FSEIS. Under Section 1506.3(b) of the CEQ Regulations, the FEIS must be recirculated for a 30-day Wait Period. Review Period Ends: 03/19/2012. EIS-0476-FEIS_Adoption-2012.pdf More Documents & Publications EIS-0370: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0337: EPA Notice of Availability of the Final Environmental Impact

299

EIS-0404: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Final Environmental Impact Statement 4: Final Environmental Impact Statement EIS-0404: Final Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California This EIS/Environmental Impact Report was prepared by the Department of the Interior (Bureau of Reclamation, Mid-Pacific Region) and the Contra Costa Water District to evaluate the environmental impacts of a proposal to enlarge the existing Los Vaqueros Reservoir in Contra Costa County, California. DOE's Western Area Power Administration (Western) was a cooperating agency because it has jurisdiction over transmission facilities that were expected to be relocated under the proposed action. Based on project changes, however, Western has no action and therefore will not adopt the EIS or issue a ROD. EIS-0404-FEIS-vol1-2010.pdf

300

EIS-0444: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This draft environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project (TCEP). The TCEP would use coal-based integrated gasification combined-cycle technology to generate electric power and would capture carbon dioxide (CO2) for use in enhanced oil recovery (EOR) and eventual sequestration. The plant would generate 400 megawatts (gross) of

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EIS-0423: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0423: Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. EIS-0423-FEIS-Summary-2011.pdf Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement: Volume 1, DOE/EIS-0423 (January 2011)

302

EIS-0382: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0382: Final Environmental Impact Statement EIS-0382: Final Environmental Impact Statement EIS-0382: Final Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Final Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 600 megawatts of electricity (MWe) for export to the electrical grid, 1,200 MWe total. DOE's Proposed Action is to provide a total of $36 million in co-funding, through a

303

Interagency Collaboration to Address Environmental Impacts of Shale Gas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interagency Collaboration to Address Environmental Impacts of Shale Interagency Collaboration to Address Environmental Impacts of Shale Gas Drilling Interagency Collaboration to Address Environmental Impacts of Shale Gas Drilling April 23, 2013 - 12:06pm Addthis Dr. John Howard (right), Director of NIOSH and Dr. Anthony Cugini (left), Director of NETL announced the establishment of a research partnership to evaluate the environmental impacts of shale gas drilling. Dr. John Howard (right), Director of NIOSH and Dr. Anthony Cugini (left), Director of NETL announced the establishment of a research partnership to evaluate the environmental impacts of shale gas drilling. Washington, DC - A memorandum of understanding to perform collaborative research related to airborne emissions and air quality at natural gas drilling sites has been signed by the Office of Fossil Energy's National

304

EPA -- Amended Environmental Impact Statement Filing System Guidance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Environmental Impact Statement Filing System Amended Environmental Impact Statement Filing System Guidance EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act The purpose of the EPA Filing System Guidelines is to provide guidance to federal agencies on filing draft, final, and supplemental EISs. Information is provided on: (1) how to file an EIS; (2) the steps to follow when adopting an EIS, or when an EIS is withdrawn, delayed or reopened; (3) public review periods; (4) issuance of notices of availability in the Federal Register; and (5) retention of filed EISs. These updated guidelines

305

EPA -- Amended Environmental Impact Statement Filing System Guidance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA -- Amended Environmental Impact Statement Filing System EPA -- Amended Environmental Impact Statement Filing System Guidance EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act The purpose of the EPA Filing System Guidelines is to provide guidance to federal agencies on filing draft, final, and supplemental EISs. Information is provided on: (1) how to file an EIS; (2) the steps to follow when adopting an EIS, or when an EIS is withdrawn, delayed or reopened; (3) public review periods; (4) issuance of notices of availability in the Federal Register; and (5) retention of filed EISs. These updated guidelines

306

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Jump to main content. National Environmental Policy Act (NEPA) Recent Additions | Contact Us Search: All EPA Compliance and Enforcement q You are here: EPA Home q Compliance and Enforcement q National Environmental Policy Act (NEPA) q Submitting Environmental Impact Statements Submitting Environmental Impact Statements q Amended EIS Filing System Guidelines (January 2011) q Where to Submit (or "File") an EIS q Filing an EIS--Draft, Final and Supplemental q EIS Filing Procedure for Continuity of Operations Plan (COOP) Events q Notice in the Federal Register q Time Periods Amended EIS Filing System Guidelines (January 2011)

307

EIS-0396: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Draft Programmatic Environmental Impact Statement 6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the President's Advanced Energy Initiative, is intended to support a safe, secure, and sustainable expansion of nuclear energy, both domestically and internationally. Domestically, the GNEP Program would promote technologies that support economic, sustained production of nuclear-generated electricity, while reducing the impacts associated with spent nuclear fuel disposal and reducing proliferation risks. The Department of Energy (DOE) proposed action envisions changing the United States nuclear energy fuel cycle from an open (or once-through) fuel

308

EIS-0449: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

49: Final Environmental Impact Statement 49: Final Environmental Impact Statement EIS-0449: Final Environmental Impact Statement Blythe Solar Power Project This Plan Amendment/Final Environmental Impact Statement (PA/FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction, operation and decommissioning of a solar electricity generation facility. The Agency Preferred Alternative covers approximately 7,025 acres (ac), managed by the BLM, and would generate 1000 megawatts (MW) of electricity annually. The PA/FEIS identifies impacts of the Agency Preferred Alternative, including impacts related to biological resources,

309

EIS-0198: Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

198: Programmatic Environmental Impact Statement 198: Programmatic Environmental Impact Statement EIS-0198: Programmatic Environmental Impact Statement Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project This PEIS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law codified at 42USC '7901 et seq. This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water

310

2006 Long Range Development Plan Final Environmental ImpactReport  

SciTech Connect

This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for this EIR was issued. This reduction was in response to consultation with the City of Berkeley as well as other factors. CEQA requires that, before a decision can be made by a state or local government agency to approve a project that may have significant environmental effects, an EIR must be prepared that fully describes the environmental effects of the project. The EIR is a public informational document for use by University decision-makers and the public. It is intended to identify and evaluate potential environmental consequences of the proposed project, to identify mitigation measures that would lessen or avoid significant adverse impacts, and to examine feasible alternatives to the project. The information contained in the EIR is reviewed and considered by the lead agency prior to its action to approve, disapprove, or modify the proposed project.

Philliber, Jeff

2007-01-22T23:59:59.000Z

311

EIS-0226: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

226: Final Environmental Impact Statement 226: Final Environmental Impact Statement EIS-0226: Final Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The Decommissioning and/or Long-Term Stewardship EIS has been prepared in accordance with NEPA and the State Environmental Quality Review Act (SEQR) to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in the EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in the EIS are intended

312

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Notice of Availability of Draft Environmental Impact DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

313

EIS-0303: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03: Draft Environmental Impact Statement 03: Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste incidental to reprocessing. The proposed action would begin after bulk waste removal has been completed. This EIS evaluates three alternatives regarding the HLW tanks at the SRS. The three alternatives are the Clean and Stabilize Tanks

314

EIS-0023: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

023: Final Environmental Impact Statement 023: Final Environmental Impact Statement EIS-0023: Final Environmental Impact Statement Long-Term Management of Defense High-Level Radioactive Wastes (Research and Development Program for Immobilization) Savannah River Plant, Aiken, South Carolina This EIS analyzes the potential environmental implications of the proposed continuation of a large Federal research and development (R&D) program directed toward the immobilization of the high-level radioactive wastes resulting from chemical separations operations for defense radionuclides production at the DOE Savannah River Plant (SRP) near Aiken, South Carolina. EIS-0023-FEIS-1979.pdf EIS-0023-FEIS-Figures-1979.pdf EIS-0023-FEIS-Tables-1979.pdf More Documents & Publications EIS-0062: Final Environmental Impact Statement

315

EIS-0434: Notice of Cancellation of an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Notice of Cancellation of an Environmental Impact 4: Notice of Cancellation of an Environmental Impact Statement EIS-0434: Notice of Cancellation of an Environmental Impact Statement Interconnection of the Hualapai Valley Solar Project, Mohave County, Arizona Western Area Power Administration is cancelling the preparation of an environmental impact statement under the National Environmental Policy Act on an interconnection request by the Hualapai Valley Solar, LLC (HVS). DATES: This cancellation is effective on September 16, 2011. For more information, contact: Mr. Matt Blevins NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Fax: 720-962-7263 Telephone: 720-962-7261 or 800-336-7288 Electronic mail: Blevins@wapa.gov EIS-0434-NoticeofCancellation-2011.pdf More Documents & Publications

316

EPA -- Electronic Submittal of Environmental Impact Statements to EPA |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electronic Submittal of Environmental Impact Statements to Electronic Submittal of Environmental Impact Statements to EPA EPA -- Electronic Submittal of Environmental Impact Statements to EPA e-NEPA is the Environmental Protection Agency's (EPA's) tool for submitting EIS documents electronically. The system meets EPA's requirements for EIS filing, and eliminates the need to mail hard copies of EISs to EPA. As before, to have your agency's EIS appear in EPA's Federal Register Notice of Availability, submit by 5:00 pm Eastern Standard Time on the prior Friday. Please note that using e-NEPA for filing does not affect agencies' responsibilities for public distribution of EISs. Additionally, e-NEPA registration is only open to government employees: contractors cannot submit EIS documents through e-NEPA. e-NEPA Electronic Submittal of Environmental Impact Statements to EPA

317

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0447: DOE Notice of Availability of Draft Environmental Impact EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

318

EIS-0303: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste incidental to reprocessing. The proposed action would begin after bulk waste removal has been completed. This EIS evaluates three alternatives regarding the HLW tanks at the SRS. The three alternatives are the Clean and Stabilize Tanks

319

EIS-0448: Notice of Adoption of an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Adoption of an Environmental Impact Statement Notice of Adoption of an Environmental Impact Statement EIS-0448: Notice of Adoption of an Environmental Impact Statement First Solar Desert Sunlight Solar Farm Project Notice of Adoption by the Department of Energy from the Environmental Protection Agency: First Solar Desert Sunlight Solar Farm (DSSF) Project, proposes to develop a 550-megawatt photovoltaic solar project and proposes to facilitate the construction and operation of the Red Bluff Substation, California Desert Conservation Area (CDCA) Plan, Riverside County, California. Notice of Adoption First Solar Desert Sunlight Solar Farm (DSSF) Project, DOE/EIS-0448 (June 2011 - 76 FR 37111) More Documents & Publications EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement

320

EIS-0046: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0046: Final Environmental Impact Statement Management of Commercially Generated Radioactive Waste This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to 1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0403: Final Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Programmatic Environmental Impact Statement Final Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) The BLM and DOE have jointly prepared this PEIS to evaluate actions that the agencies are considering taking to further facilitate utility-scale solar energy development in six southwestern states. For the BLM, this includes the evaluation of a new Solar Energy Program applicable to solar development on BLM-administered lands. For DOE, it includes the evaluation of developing new guidance to further facilitate utility-scale solar energy development and maximize the mitigation of associated potential environmental impacts. This Solar PEIS evaluates the potential environmental, social, and economic effects of the agencies'

322

EIS-0425: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0425: Final Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in

323

EIS-0448: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0448: Final Environmental Impact Statement Desert Sunlight Solar Farm Project, California This Plan Amendment/Final Environmental Impact Statement (PA/FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction, operation and decommissioning of a solar photovoltaic energy generation facility. The Agency Preferred Alternative covers approximately 4,176 acres (ac), managed by the BLM, and would generate 550 megawatts (MW) of electricity annually. The PA/FEIS identifies impacts of the Agency Preferred Alternative,

324

EIS-0062: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0062: Final Environmental Impact Statement EIS-0062: Final Environmental Impact Statement EIS-0062: Final Environmental Impact Statement Waste Management Operations Double-Shell Tanks for Defense High-Level Radioactive Waste Storage Savannah River Plant, Aiken, South Carolina This final environmental impact statement (EIS) has been prepared in compliance with the September 29, 1979, order of the Federal District Court for the District of Columbia (Natural Resources Defense Council, et al., V. Administrator ERDA/DOE, et al. (D.D.c. Civ. No. 76-1691). The statement analyzes the impacts of the various design alternatives for the construction of fourteen 1.3 million gallon high-activity radioactive waste tanks. The EIS evaluates the effects of these alternative designs on tank durability, on the ease of waste retrieval from such tanks, and the choice

325

EIS-0448: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48: Final Environmental Impact Statement 48: Final Environmental Impact Statement EIS-0448: Final Environmental Impact Statement Desert Sunlight Solar Farm Project, California This Plan Amendment/Final Environmental Impact Statement (PA/FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction, operation and decommissioning of a solar photovoltaic energy generation facility. The Agency Preferred Alternative covers approximately 4,176 acres (ac), managed by the BLM, and would generate 550 megawatts (MW) of electricity annually. The PA/FEIS identifies impacts of the Agency Preferred Alternative,

326

EIS-0250-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0250-S2: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain-Nevada Rail Transportation Corridor The Nevada Rail Corridor SEIS (DOE/EIS-0250F-S2D) analyzes the potential impacts of constructing and operating a railroad to connect the Yucca Mountain repository site to an existing rail line near Wabuska, Nevada (in the Mina rail corridor). The Nevada Rail Corridor SEIS analyzes the Mina rail corridor at a level of detail commensurate with that of the rail corridors analyzed in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

327

EIS-0349: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0349: Final Environmental Impact Statement BP Cherry Point Cogeneration Project BP West Coast Products, LLC proposes to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery. This EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic benefits of the proposed action, and identifies mitigation measures to compensate for the unavoidable impacts. Alternative project sites, power-generating and pollution-control technologies, and the No Action Alternative also are described. EIS-0349-FEIS-01-2004.pdf EIS-0349-FEIS-02-2004.pdf EIS-0349-FEIS-Figures-2004.pdf EIS-0349-FEIS-Appendices-2004.pdf

328

EIS-0250-S2: Final Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement EIS-0250-S2: Final Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada The Nevada Rail Corridor SEIS (DOE/EIS-0250F-S2) analyzes the potential impacts of constructing and operating a railroad to connect the Yucca Mountain repository site to an existing rail line near Wabuska, Nevada (in the Mina rail corridor). The Nevada Rail Corridor SEIS analyzes the Mina rail corridor at a level of detail commensurate with that of the rail corridors analyzed in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada (DOE/EIS-0250F).

329

EIS-0236: Notice of Intent to Prepare a Supplemental Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement EIS-0236: Notice of Intent to Prepare a Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement Stockpile Stewardship and Management The Department of Energy (DOE) is announcing a revised schedule for its preparation of a Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility portion (Volume III, Appendix I) of the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (DOE/EIS-0236; September, 1997). EIS-0236, Notice of Intent to prepare Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (August 1999)

330

Implementation plan: Executive summary. Environmental restoration and waste management programmatic environmental impact statement  

SciTech Connect

In November 1989, the Secretary of Energy established the U.S. Department of Energy Office of Environmental Restoration and Waste Management. This action consolidated the Department`s environmental restoration and waste management activities throughout the nation. In January 1990, the Secretary of Energy decided that the Department would prepare a Programmatic Environmental Impact Statement on the proposed integrated Environmental Restoration and Waste Management Program. The principal focus of the Programmatic Environmental Impact Statement process will be the evaluation of strategies for conducting remediation of Department sites and facilities to ensure the protection of human health and the environment; and the evaluation of potential configurations for waste management capabilities.

Not Available

1994-01-01T23:59:59.000Z

331

EIS-0473: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73: Final Environmental Impact Statement 73: Final Environmental Impact Statement EIS-0473: Final Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion carbon dioxide (CO2) Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale CO2 capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson County, Texas, for use in enhanced oil recovery

332

EIS-0399: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a merchant 230-kV transmission line between Great Falls, Montana, and Lethbridge, Alberta, that would cross the U.S.-Canada border north of Cut Bank, Montana. The transmission line would transmit 300 megawatts (MW) of electric power south and 300 MW north. EIS-0399-DEIS-Summary-2008.pdf EIS-0399-DEIS-01a-2008.pdf EIS-0399-DEIS-01b-2008.pdf EIS-0399-DEIS-01c-2008.pdf EIS-0399-DEIS-01d-2008.pdf EIS-0399-DEIS-01e-2008.pdf EIS-0399-DEIS-02-2008.pdf More Documents & Publications EIS-0399: Final Environmental Impact Statement EIS-0399-SA-01: Supplement Analysis Management Alert: OAS-RA-12-01

333

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement on Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 2:07pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of the Interior's Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity

334

EIS-0336: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345 kV) electric transmission line that would begin south of Tucson, Arizona, in the vicinity of Sahuarita, cross the U.S.-Mexico border, and continue into the Sonoran region of northern Mexico to Santa Ana.FE has prepared this Draft EIS to address the environmental impacts of the proposed action and reasonable alternatives, including the "No Action" alternative. In addition, because the U.S. Forest Service, the Bureau of Land Management, and the U.S. International Boundary Water Commission (USIBWC) must act, and because their actions are

335

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 4:31pm Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in

336

Greenhouse Gas Emissions Impacts of Liberalizing Trade in Environmental  

Open Energy Info (EERE)

Greenhouse Gas Emissions Impacts of Liberalizing Trade in Environmental Greenhouse Gas Emissions Impacts of Liberalizing Trade in Environmental Goods Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Greenhouse Gas Emissions Impacts of Liberalizing Trade in Environmental Goods Agency/Company /Organization: International Institute for Sustainable Development (IISD) Sector: Energy, Land Focus Area: Industry Topics: Market analysis, Policies/deployment programs, Background analysis Resource Type: Publications Website: www.iisd.org/pdf/2009/bali_2_copenhagen_egs.pdf References: Greenhouse Gas Emissions Impacts of Liberalizing Trade in Environmental Goods[1] Background "As part of a suite of activities under the From Bali to Copenhagen project, IISD's work on low-carbon goods has focused on trying to measure the actual potential climate gains from what's now on the table in the WTO

337

EIS-0435: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0435: Draft Environmental Impact Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to modify its interconnection agreement with Basin Electric for the Groton Generation Station to eliminate Western's 50-megawatts (MW) annual average operating limit. The Groton Generation Station is located about 5 miles south of Groton, South Dakota. Basin Electric needs to eliminate the operating limit to help serve increased load demand for electric power in the eastern portion of its service area Western Area Power Administration Draft Environmental Impact Statement

338

EIS-0414: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14: Final Environmental Impact Statement 14: Final Environmental Impact Statement EIS-0414: Final Environmental Impact Statement Energia Sierra Juarez Transmission Project This EIS evaluates the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The County of San Diego is a cooperating agency in the preparation of this EIS. EIS-0414-FEIS-2012-Volume1.pdf EIS-0414-FEIS-2012-Volume2a.pdf EIS-0414-FEIS-2012-Volume2b.pdf EIS-0414-FEIS-2012-Volume3a.pdf EIS-0414-FEIS-2012-Volume3b.pdf

339

EIS-0319: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0319: Final Environmental Impact Statement Relocation of Technical Area 18 Capabilities and Materials at the Los Alamos National Laboratory The TA-18 Relocation EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with this proposed action at the following DOE sites: (1) a different site at LANL at Los Alamos, New Mexico; (2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; (3) the Nevada Test Site near Las Vegas, Nevada (the Preferred Alternative); and (4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS also analyzes the alternatives of upgrading the existing TA-18 facilities and the No Action Alternative of maintaining the operations at the current TA-18 location.

340

EIS-0423: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury DOE proposes to construct one or more new facilities and/or select one or more existing facilities (including modification as needed) for the long-term management and storage of mercury, as mandated by Section 5 of the Act. Any such facility must comply with applicable requirements of Section 5 of the Act, "Management Standards for a Facility," including the requirements of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901 et seq.) and other permitting requirements. Draft Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement, DOE/EIS-0423D (January 2010)

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0171: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71: Final Environmental Impact Statement 71: Final Environmental Impact Statement EIS-0171: Final Environmental Impact Statement Bonneville Power Administration, PacifiCorp Capacity Power Sale Contract The Bonneville Power Administration (BPA) must respond to the need for power as represented by PacifiCorp's request for a continued supply of firm capacity. BPA has surplus electrical capacity (peakload energy) that BPA projects will not be required to meet its existing obligations. Such obligations include those to meet the loads of firm power customers, pursuant to the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), and previously committed capacity contracts. DOE/EIS-0171, Bonneville Power Administration, PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement (1994)

342

EIS-0222: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington The DOE has prepared this HCP EIS to evaluate the potential environmental impacts associated with implementing a comprehensive land-use plan (CLUP) for the Hanford Site for at least the next 50 years. The DOE is expected to use this land-use plan in its decision-making process to establish what is the "highest and best use" of the land (41 Code of Federal Regulations [CFR] 101-47, "Federal Property Management Regulations"). The final selection of a land-use map, land-use policies, and implementing procedures would create the working CLUP when they are adopted through the ROD for

343

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in the West to

344

EIS-0401: Notice of Cancellation of an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Notice of Cancellation of an Environmental Impact 1: Notice of Cancellation of an Environmental Impact Statement EIS-0401: Notice of Cancellation of an Environmental Impact Statement Proposed NextGen Project near Selby, Walworth County, South Dakota The Department of Energy, Western Area Power Administration is issuing this notice of cancellation for the preparation of an environmental impact statement for the Proposed NextGen Project near Selby, Walworth County, South Dakota. Basin Electric Power Cooperative (BEPC) proposed to design construct, operate, and maintain a 500- to 700-megawatt base load, coal-fired generation facility near Selby, Walworth County, South Dakota, and interconnect it with Western's transmission system. BEPC has notified Western it is suspending further action on its proposed project.

345

EIS-0414: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0414: Final Environmental Impact Statement Energia Sierra Juarez Transmission Project This EIS evaluates the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The County of San Diego is a cooperating agency in the preparation of this EIS. EIS-0414-FEIS-2012-Volume1.pdf EIS-0414-FEIS-2012-Volume2a.pdf EIS-0414-FEIS-2012-Volume2b.pdf EIS-0414-FEIS-2012-Volume3a.pdf EIS-0414-FEIS-2012-Volume3b.pdf

346

EIS-0409: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and hot exhaust gas from the gas turbines would generate steam from water to drive a steam turbine. EIS-0409-DEIS-Summary-2009.pdf Draft Environmental Impact Statement, Kemper...

347

EIS-0418: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0418: Final Environmental Impact Statement South Dakota PrairieWinds Project PrairieWinds, SD1, Incorporated (PrairieWinds) is a wholly owned subsidiary of Basin Electric Power Cooperative (Basin Electric). PrairieWinds proposes to construct, own, operate, and maintain the South Dakota PrairieWinds Project, a 151.5-megawatt (MW) nameplate capacity wind powered generation facility, including 101 General Electric 1.5-MW wind turbine generators, electrical collector lines, collector substation, transmission line, communications system, and wind turbine service access roads. Final Environmental Impact Statement for the South Dakota PrairieWinds Project, DOE/EIS-0418 (July 2010) EIS-0418-FEIS-02-2010.pdf More Documents & Publications

348

EIS-0271: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0271: Final Environmental Impact Statement Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium. This EIS is linked to the Final Programmatic Environmental Impact

349

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14: Draft Environmental Impact Statement 14: Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

350

DOE Issues Final Environmental Impact Statement for Moab, Utah Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for Moab, Utah Site Environmental Impact Statement for Moab, Utah Site DOE Issues Final Environmental Impact Statement for Moab, Utah Site July 25, 2005 - 2:27pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its final environmental impact statement (EIS) for the Moab Uranium Mill Tailings Remedial Action Project Site, located on the bank of the Colorado River. The EIS details the preferred option of removal of the tailings pile and contaminated materials, along with ground water remediation. The tailings will be moved, predominately by rail, to the proposed Crescent Junction, Utah, site, more than 30 miles from the Colorado River. "Taking all facts into account, we believe the recommendations issued today provide the best solution to cleaning up Moab and protecting the River,"

351

EIS-0305: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Draft Environmental Impact Statement 5: Draft Environmental Impact Statement EIS-0305: Draft Environmental Impact Statement Treating Transuranic/Alpha Low-Level Waste at the Oak Ridge National Laboratory This EIS evaluates the potential environmental impacts of a proposal to construct, operate, and decontaminate/decommission a TRU Waste Treatment Facility in Oak Ridge, Tennessee. The four waste types that would be treated at the proposed facility would be remote-handled TRU mixed waste sludge, liquid low-level waste associated with the sludge, contact-handled TRU/alpha low-level waste solids, and remote-handled TRU/alpha low-levelwaste solids. The mixed sludge and some of the solid waste contain metals regulated under the Resource Conservation and Recovery Act and may be classified as mixed waste.

352

EIS-0490: Final Environmental Impact Statement (Adopted) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0490: Final Environmental Impact Statement (Adopted) EIS-0490: Final Environmental Impact Statement (Adopted) EIS-0490: Final Environmental Impact Statement (Adopted) Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, NV The Federal Highway Administration and the Nevada Department of Transportation prepared an EIS to evaluate the potential environmental impacts of the proposed Boulder City/U.S. 93 Bypass Project in Boulder County, Nevada. DOE's Western Area Power Administration, a cooperating agency, adopted the Final EIS and issued a Record of Decision to modify Western's transmission system and facilities to accommodate the construction of the project. The project website is http://www.nevadadot.com/Micro-Sites/BoulderCityBypass/The_Boulder_City_Bypass.aspx EIS-0490-Adopted-Volume1.pdf

353

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement on Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of the Interior's Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity

354

EIS-0271: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Final Environmental Impact Statement 1: Final Environmental Impact Statement EIS-0271: Final Environmental Impact Statement Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium. This EIS is linked to the Final Programmatic Environmental Impact

355

EIS-0433-S1: Draft Supplemental Environmental Impact Statement | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0433-S1: Draft Supplemental Environmental Impact Statement Keystone XL Project This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the Texas Gulf Coast area. DOE is a cooperating agency. DOE's Western Area Power Administration has jurisdiction over certain proposed transmission facilities relating to the proposal, including construction and operation of a portion of a 230-kilovolt transmission line and construction and operation of two new

356

EIS-0457: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the potential environmental impacts of a Bonneville Power Administration (BPA) proposal to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of Albany, Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. BPA issued the Draft EIS in January 2012 for public review. BPA considered all comments received to prepare this Comment-Response Addendum (download below) which, together with the Draft EIS, consitutes the Final EIS [40 CFR 1503.4(c)]. The Comment-Response Addendum includes a chapter

357

DOE Prepares Programmatic Environmental Impact Statement for the Uranium  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prepares Programmatic Environmental Impact Statement for the Prepares Programmatic Environmental Impact Statement for the Uranium Leasing Program DOE Prepares Programmatic Environmental Impact Statement for the Uranium Leasing Program January 18, 2012 - 3:13pm Addthis DOE Prepares Programmatic Environmental Impact Statement for the Uranium Leasing Program What does this project do? Goal 4. Optimize the use of land and assets The U.S. Department of Energy (DOE) Office of Legacy Management is responsible for administering the DOE Uranium Leasing Program (ULP) and its 31 uranium lease tracts located in the Uravan Mineral Belt of southwestern Colorado. The ULP began in 1948 when Congress authorized the U.S. Atomic Energy Commis-sion (AEC), a predecessor agency of DOE, to withdraw lands from the public domain for the sole purpose of exploring for, developing,

358

EIS-0473: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0473: Final Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion carbon dioxide (CO2) Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale CO2 capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson County, Texas, for use in enhanced oil recovery

359

EIS-0385: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0385: Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve As required by the Energy Policy Act of 2005 (P.L. 109-58), DOE would expand the SPR to its full authorized 1 billion-barrel capacity by selecting additional storage sites. DOE would develop one new site or a combination of two new sites, and would expand capacity at two or three existing sites. Storage capacity would be developed by solution mining of salt domes and disposing of the resulting salt brine by ocean discharge or underground injection. New pipelines, marine terminal facilities, and other infrastructure could also be required. DOE has prepared this draft EIS to address the environmental impacts of the proposed expansion of the capacity

360

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 11:31am Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Waste Management Programmatic Environmental Impact Statement (WM PEIS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision The Final Waste Management Programmatic Environmental Impact Statement (WM PEIS) is a nationwide study examining the environmental impacts of managing more than 2 million cubic meters of radioactive wastes from past, present, and future DOE activities. The WM PEIS will assist the U.S. Department of Energy (DOE) in improving the efficiency and reliability of management of its current and anticipated volumes of radioactive and hazardous wastes and will help DOE continue to comply with applicable laws and regulations and protect workers, public health and safety, and the environment. The WM PEIS

362

DOE Initiates Environmental Impact Statement for Global Nuclear Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiates Environmental Impact Statement for Global Nuclear Initiates Environmental Impact Statement for Global Nuclear Energy Partnership Technology Demonstrations DOE Initiates Environmental Impact Statement for Global Nuclear Energy Partnership Technology Demonstrations March 22, 2006 - 9:39am Addthis WASHINGTON , DC - The U.S. Department of Energy (DOE) today announced plans to prepare an environmental impact statement (EIS) for the technology demonstration program of the Global Nuclear Energy Partnership (GNEP) initiative. DOE issued in the Federal Register today an Advance Notice of Intent to prepare an EIS for the GNEP technology demonstration program and plans to issue the final Notice of Intent in summer 2006. The advance notice requests comments from the public and private sectors on the scope of the EIS, reasonable alternatives, and other relevant information.

363

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

364

EIS-0409: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0409: Final Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project This Final EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding and possibly a loan guarantee for construction and operation of advanced power generation plant in Kemper County, Mississippi. The project was selected under DOE's Clean Coal Power Initiative to demonstrate IGCC technology. DOE also invited Mississippi Power Company to submit an application for the Kemper County IGCC Project to the Loan Guarantee Program during 2008. Assessment of a prospective loan guarantee is currently in progress. The power genera- tion components (i.e., coal gasifiers, synthesis gas [syngas]

365

EIS-0082-S2: Final Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement EIS-0082-S2: Final Supplemental Environmental Impact Statement Savannah River Site Salt Processing This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions now stored in underground tanks at the Savannah River Site (SRS) near Aiken, South Carolina. The high-activity fraction of the high-level waste (HLW) salt solution would then be vitrified in the Defense Waste Processing Facility (DWPF) and stored until it could be disposed of as HLW in a geologic repository. The low activity fraction would be disposed of as low-level waste (saltstone) in vaults at SRS. EIS-0082-S2-2001.pdf

366

EIS-0318: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0318: Final Environmental Impact Statement Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project The Kentucky Pioneer IGCC Demonstration Project Final EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared financial support for construction and operation of an electrical power station demonstrating use of a Clean Coal Technology in Clark County, Kentucky. Under the Proposed Action, DOE would provide financial assistance, through a Cooperative Agreement with Kentucky Pioneer Energy, LLC, for design, construction, and operation of a 540 megawatt demonstration power station comprised of two synthesis gas-fired combined cycle units in Clark County, Kentucky. The station would also be

367

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

368

EIS-0443: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Impact Statement 3: Final Environmental Impact Statement EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near Ely, Nevada. Partial financing of SWlP-South is being considered under the provisions of Western's Transmission Infrastructure Program. Final Environmental Impact Statement Project Financing for Southwest Intertie Project - South, DOE/EIS-0443 (January 2010)

369

EIS-0374: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike III/Biglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. EIS-0374-DEIS-Summary-2006.pdf EIS-0374-DEIS-2006.pdf EIS-0374-DEIS-commentextension-2005.pdf More Documents & Publications EIS-0374: Final Environmental Impact Statement EIS-0374: Notice of Extension of Comment Period EIS-0374: Record of Decision

370

EIS-0450: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0: Draft Environmental Impact Statement 0: Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. EIS-0450-DEIS-Volume1-2013.pdf EIS-0450-DEIS-Volume2-2013.pdf EIS-0450-DEIS-Volume3-2013.pdf EIS-0450-DEIS-Appendices_A-H-2013.pdf More Documents & Publications

371

EIS-0354: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Final Environmental Impact Statement 4: Final Environmental Impact Statement EIS-0354: Final Environmental Impact Statement Ivanpah Energy Center Ivanpah Energy Center, L.P., a Diamond Generating Corporation Company, a subsidiary of Mitsubishi Corporation proposes to construct and operate a 500 Megawatt (MW) gasfired electric power generating station in southern Clark County, Nevada. The facility would be known as the Ivanpah Energy Center, LP (IEC). The Environmental Impact Statement evaluates several potential plant sites, two of which were determined to be reasonable alternatives for development. Construction at either site would require consideration of a natural gas supply pipeline, access roads, process water availability and conveyance, telecommunications, and electrical transmission interconnections to the southern Nevada power grid. The

372

EIS-0460: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 program. The FutureGen 2.0 program would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated with a pipeline that would transport carbon dioxide to a sequestration site where it would be injected and stored in a deep geologic formation. EIS-0460-DEIS-Summary-2013.pdf EIS-0460-DEIS-Volume_I-2013.pdf EIS-0460-DEIS-Volume_II-2013.pdf More Documents & Publications

373

EIS-0330: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Final Environmental Impact Statement 0: Final Environmental Impact Statement EIS-0330: Final Environmental Impact Statement Wallula Power Project and Wallula - McNary Transmission Line Project Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed. Wallula Power Project and Wallula - McNary Transmission Line Project Final

374

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

375

Salt Wells Geothermal Energy Projects Environmental Impact Statement | Open  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Salt Wells Geothermal Energy Projects Environmental Impact Statement Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells Geothermal Energy Projects Environmental Impact Statement Abstract Abstract unavailable. Author Bureau of Land Management Published U.S. Department of the Interior- Bureau of Land Management, Carson City Field Office, Nevada, 07/22/2011 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Salt Wells Geothermal Energy Projects Environmental Impact Statement Citation Bureau of Land Management. Salt Wells Geothermal Energy Projects Environmental Impact Statement [Internet]. 07/22/2011. Carson City, NV. U.S. Department of the Interior- Bureau of Land Management, Carson City

376

EIS-0488: FERC Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

88: FERC Draft Environmental Impact Statement 88: FERC Draft Environmental Impact Statement EIS-0488: FERC Draft Environmental Impact Statement Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

377

EIS-0389: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0389: Final Environmental Impact Statement Trinity Public Utilities District Direct Interconnection Project The Western Area Power Administration (Western), part of the U.S. Department of Energy (DOE), prepared an environmental impact statement (EIS) on the construction and operation of proposed power transmission facilities in Trinity County, California. The U.S. Forest Service (USFS), the Bureau of Land Management (BLM), and the Bureau of Reclamation (Reclamation) participated in the preparation of the EIS, which addresses the proposed removal of about 5.3 mi of 12-kilovolt (kV) distribution line and the construction and operation of about 16 mi of new 60-kV transmission line, a tap structure and associated equipment, and a new switchyard. The

378

Final Supplemental Environmental Impact Statement for a Geologic Repository  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Impact Statement for a Geologic Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation CorridorDOE/EIS-0250F-S2andFinal Envir Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation CorridorDOE/EIS-0250F-S2andFinal Envir This part of the Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada -- Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2) (Nevada Rail Corridor SEIS)

379

EIS-0350-S1: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico National Nuclear Security Administration, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. This CMRR-NF SEIS examines the potential environmental impacts associated with NNSA's proposed

380

Northern Pass Transmission Line Project Environmental Impact Statement:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 DOE has changed the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On September 6, 2013, the U.S. Department of Energy (DOE) published in the Federal Register an amended Notice of Intent (NOI) to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Modeling environmental impact of unfired bricks in India  

E-Print Network (OSTI)

Brick manufacturing requires a considerable amount of energy and land, but these numbers have been difficult to quantify in rural parts of the developing world. The environmental impact of unfired bricks in India is ...

Zachau Walker, Miriam E. (Miriam Elizabeth)

2013-01-01T23:59:59.000Z

382

Final Environmental Impact Statement Safe Interim Storage Of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

retrieved, transferred and Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes file:I|Data%20Migration%20TaskEIS-0212-FEIS-Summary-1995.html6...

383

EIS-0299: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an environmental impact statement (EIS) for the proposed production of plutonium-238 (Pu-238) using one or more DOE research reactors and facilities. The Pu-238 would be used in...

384

EIS-0449: Notice of Adoption of the Final Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0449: Notice of Adoption of the Final Environmental Impact Statement Blythe Solar Power Project EIS-0449-FEIS-EPA-NOA-2010.pdf More Documents & Publications EIS-0421:...

385

EIS-0288; Final Environmental Impact Statement for the Production...  

National Nuclear Security Administration (NNSA)

power, one diesel pump for firefighting, two auxiliary boilers fired with No. 2 fuel oil (0.5 percent Final Environmental Impact Statement for the Production of Tritium in a...

386

EIS-0319: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19: Final Environmental Impact Statement 19: Final Environmental Impact Statement EIS-0319: Final Environmental Impact Statement Relocation of Technical Area 18 Capabilities and Materials at the Los Alamos National Laboratory The TA-18 Relocation EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with this proposed action at the following DOE sites: (1) a different site at LANL at Los Alamos, New Mexico; (2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; (3) the Nevada Test Site near Las Vegas, Nevada (the Preferred Alternative); and (4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS also analyzes the alternatives of upgrading the existing TA-18 facilities and the No Action Alternative of maintaining the

387

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Draft Environmental Impact Statement 8: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

388

DOE Plans Supplemental Environmental Impact Statement for New Petroleum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plans Supplemental Environmental Impact Statement for New Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi DOE Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi March 5, 2008 - 10:52am Addthis Three Public Meetings Planned Next Month; Supplemental Study to Include Floodplain and Wetlands Assessments WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced plans to prepare a Supplemental Environmental Impact Statement (SEIS) for the nation's Strategic Petroleum Reserve (SPR) expansion site in Richton, MS. This supplemental study will consider whether to select a new location for new petroleum reserve's raw water intake structure from the Leaf River to an alternate location with greater water availability. The SEIS will also

389

EIS-0385: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0385: Final Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve As required by the Energy Policy Act of 2005 (P.L. 109-58), DOE would expand the SPR to its full authorized 1 billion-barrel capacity by selecting additional storage sites. DOE would develop one new site or a combination of two new sites, and would expand capacity at two or three existing sites. Storage capacity would be developed by solution mining of salt domes and disposing of the resulting salt brine by ocean discharge or underground injection. New pipelines, marine terminal facilities, and other infrastructure could also be required. DOE has prepared this draft EIS to address the environmental impacts of the proposed expansion of the capacity

390

DOE Initiates Environmental Impact Statement for Global Nuclear Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for Global Nuclear Environmental Impact Statement for Global Nuclear Energy Partnership Technology Demonstrations DOE Initiates Environmental Impact Statement for Global Nuclear Energy Partnership Technology Demonstrations March 22, 2006 - 9:39am Addthis WASHINGTON , DC - The U.S. Department of Energy (DOE) today announced plans to prepare an environmental impact statement (EIS) for the technology demonstration program of the Global Nuclear Energy Partnership (GNEP) initiative. DOE issued in the Federal Register today an Advance Notice of Intent to prepare an EIS for the GNEP technology demonstration program and plans to issue the final Notice of Intent in summer 2006. The advance notice requests comments from the public and private sectors on the scope of the EIS, reasonable alternatives, and other relevant information.

391

EIS-0340: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project To assist in the conservation and recovery of Chinook salmon native to the Grande Ronde River and Imnaha River subbasins, the Proposed Action of updating and modifying two existing hatcheries and constructing three new hatchery facilities at other sites is being studied in this Draft Environmental Impact Statement (Draft EIS). BPA proposes to fund the capital improvements and the operation and maintenance of all five facilities to aid BPA's efforts to mitigate and recover anadromous fish affected by the Federal Columbia River Power System. The Lower Snake River run of spring/summer chinook was listed as threatened under the Endangered

392

EIS-0277: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0277: Final Environmental Impact Statement Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site This EIS evaluates the potential alternatives and impacts associated with a proposal to process certain plutonium residues and all of the scrub alloy currently stored at Rocky Flats. While ongoing stabilization activities at Rocky Flats are addressing immediate health and safety concerns associated with existing storage conditions, the indefinite storage of these materials, even after stabilization, would continue to present health and safety concerns that could only be eliminated by disposal or other disposition of the materials. Thus, this EIS evaluates alternative processing technologies to prepare these

393

Draft Nevada National Security Site Environmental Impact Statement Released  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada National Security Site Environmental Impact Statement Nevada National Security Site Environmental Impact Statement Released Draft Nevada National Security Site Environmental Impact Statement Released July 25, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 The Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada is available for public review and comment through October 27, 2011. Within the draft SWEIS, the U.S. Department of Energy, National Security Administration Nevada Site Office presents a formal analysis of how current and potential missions at the NNSS (formerly the Nevada Test Site) and related off-site locations may affect the environment over the next ten

394

EIS-0427: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department. The document was distributed in two volumes. DOE/EIS-0427: Draft Environmental Impact Statement for the Grapevine Canyon Project (July 2010) Volume 1 EIS-0427-DEIS-02-2010.pdf

395

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

396

EIS-0457: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57: Final Environmental Impact Statement 57: Final Environmental Impact Statement EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the potential environmental impacts of a Bonneville Power Administration (BPA) proposal to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of Albany, Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. BPA issued the Draft EIS in January 2012 for public review. BPA considered all comments received to prepare this Comment-Response Addendum (download below) which, together with the Draft EIS, consitutes the Final EIS [40 CFR 1503.4(c)]. The Comment-Response Addendum includes a chapter

397

EIS-0197: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

197: Final Environmental Impact Statement 197: Final Environmental Impact Statement EIS-0197: Final Environmental Impact Statement Delivery of the Canadian Entitlement This EIS is being prepared to aid the decision the United States Entity must make on how best to meet the United States' Treaty obligations to deliver Canada's share of the downstream power benefits. While this document, and input from all interested parties, will inform the United States' decisionmakers, any decision other than delivery to a point near Oliver, BC, must be mutually acceptable to both the United States and Canadian Entities. DOE/EIS-0197, Delivery of the Canadian Entitlement Final Environmental Impact Statement January 1996 EIS-0197-FEIS-1996_0.pdf More Documents & Publications EIS-0197: Supplement to Record of Decision

398

EIS-0455: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to respond to Genesis Solar, LLC's application under Title V of FLPMA (43 U.S.C. 1761) for a ROW grant to construct, operate, maintain and decommission a solar thermal facility on public lands in compliance with FLPMA, BLM ROW regulations, and other applicable Federal laws. The BLM will decide whether to approve, approve with modification, or deny issuance of a ROW grant to Genesis Solar, LLC for the proposed GSEP. Bureau of Land Management Plan Amendment/Final Environmental Impact Statement for the Genesis Solar Energy Project Volume 1, DOE/EIS-0455 (August 2010) EIS-0455-FEIS-02-2010.pdf

399

EIS-0287: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0287: Final Environmental Impact Statement Idaho High-Level Waste and Facilities Disposition This EIS analyzes the potential environmental consequences of alternatives for managing high- level waste (HLW) calcine, mixed transuranic waste/sodium bearing waste (SBW) and newly generated liq- uid waste at the Idaho National Engineering and Environmental Laboratory (INEEL) in liquid and solid forms. This EIS also analyzes alternatives for the final disposition of HLW management facilities at the INEEL after their missions are completed. After considering comments on the Draft EIS (DOE/EIS- 0287D), as well as information on available treatment technologies, DOE and the State of Idaho have iden- tified separate preferred alternatives for

400

Environmental impacts of increased hydroelectric development...  

NLE Websites -- All DOE Office Websites (Extended Search)

27 iii 3 . 2 . 7 Energy Security Benefits . . . . . . . 3 . 3 IMPACTS OF GENERATION USING FOSSIL FUELS . . . 3 . 3 . 1 Water Resources . . . . . . . . . . . . 3 . 3 . 2 Air Quality...

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The Environmental Impacts of Subsidized Crop Insurance  

E-Print Network (OSTI)

Impacts of Subsidized Crop Insurance page 17 ReferencesR.A. Kramer. “Experience with Crop Insurance Programs in theUnited States. ” Crop Insurance for Agricultural

LaFrance, Jeffrey T.; Shimshack, J. P.; Wu, S. Y.

2001-01-01T23:59:59.000Z

402

Environmental Impacts from the Operation of Cooling Towers at SRP  

SciTech Connect

An assessment has been made of the environmental effects that would occur from the operation of cooling towers at the SRP reactors. A more realistic numerical model of the cooling tower plume has been used to reassess the environmental impacts. The following effects were considered: (1) the occurrence of fog and ice and their impact on nearby structures, (2) drift and salt deposition from the plume, (3) the length and height of the visible plume, and (4) the possible dose from tritium.

Smith, F.G. III

2001-06-26T23:59:59.000Z

403

ISSUES AND ENVIRONMENTAL IMPACTS ASSOCIATED WITH  

E-Print Network (OSTI)

multiple power plants use the same, local water body for cooling. In addition to the original thermal Nuclear Power Plant). These designs provide better evidence for thermal impacts due to plant operation for Moss Landing Power Plant). The predicted new plume and its thermal impacts can be tested with plume

404

Waste management programmatic environmental impact statement methodology for estimating human health risks  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) has produced large quantities of radioactive and hazardous waste during years of nuclear weapons production. As a result, a large number of sites across the DOE Complex have become chemically and/or radiologically contaminated. In 1990, the Secretary of Energy charged the DOE Office of Environmental Restoration and Waste management (EM) with the task of preparing a Programmatic Environmental Impact Statement (PEIS). The PEIS should identify and assess the potential environmental impacts of implementing several integrated Environmental Restoration (ER) and Waste Management (WM) alternatives. The determination and integration of appropriate remediation activities and sound waste management practices is vital for ensuring the diminution of adverse human health impacts during site cleanup and waste management programs. This report documents the PEIS risk assessment methodology used to evaluate human health risks posed by WM activities. The methodology presents a programmatic cradle to grave risk assessment for EM program activities. A unit dose approach is used to estimate risks posed by WM activities and is the subject of this document.

Bergenback, B. [Midwest Technical, Inc. (United States); Blaylock, B.P.; Legg, J.L. [Oak Ridge National Lab., TN (United States)] [and others

1995-05-01T23:59:59.000Z

405

Environmental Impacts and Siting of Wind Projects  

Energy.gov (U.S. Department of Energy (DOE))

The Wind Program works to remove barriers to wind power deployment and to increase the acceptance of wind power technologies by addressing siting and environmental issues. Wind power is a renewable...

406

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement: Summary.  

SciTech Connect

BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

407

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement

408

DOE Issues Finding of No Significant Impact and Final Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. DEPARTMENT OF ENERGY IDAHO FALLS, IDAHO, 83403 News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release Thursday August 12, 2010 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Road Project The U.S. Department of Energy has issued a Finding of No Significant Impact stemming from an environmental assessment it performed to examine the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear

409

EIS-0403: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM and DOE are considering taking actions to facilitate solar energy development in compliance with various orders, mandates, and agency policies. For the BLM, these actions include the evaluation of a new BLM Solar Energy Program applicable to all utility-scale solar energy development on BLM-administered lands in six southwestern states (Arizona, California, Colorado, Nevada, New Mexico, and Utah). For DOE, they include the evaluation of developing new program guidance relevant to DOE-supported solar projects. The Draft PEIS assesses the environmental, social, and economic effects of the agencies' proposed actions and

410

Draft Environmental Impact Statement for a Container System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Navy (Lead Agency) the Navy (Lead Agency) Naval Nuclear Propulsion Program Department of Energy (Cooperating Agency) - DOE/EIS-0251 Prepared in accordance with: National Environmental Policy Act Section 102 (2) (C) FINAL ENVIRONMENTAL IMPACT STATEMENT FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF NAVAL SPENT NUCLEAR FUEL Contact: William Knoll Department of the Navy Code NAVSEA 08U 2531 Jefferson Davis Highway Arlington, VA 22242-5160 Telephone Number: 703-602-8229 Abstract: This Final Environmental Impact Statement (EIS) addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination. It supersedes the Draft Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel dated May 1996.

411

EIS-0203: Programmatic Final Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03: Programmatic Final Environmental Impact Statement 03: Programmatic Final Environmental Impact Statement EIS-0203: Programmatic Final Environmental Impact Statement Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This EIS considers programmatic (DOE-wide) alternative approaches to safely, efficiently, and responsibly manage existing and projected quantities of spent nuclear fuel until the year 2035. This amount of time may be required to make and implement a decision on the ultimate disposition of spent nuclear fuel. DOE's spent nuclear fuel responsibilities include fuel generated by DOE production, research, and development reactors; naval reactors; university and foreign research reactors; domestic non-DOE reactors such as those at the National Institute

412

EIS-0470: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Final Environmental Impact Statement 0: Final Environmental Impact Statement EIS-0470: Final Environmental Impact Statement Cape Wind Energy Project, Nantucket Sound, MA The DOE Loan Program Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. In December 2012, DOE adopted the Department of the Interior 2009 Final Cape Wind Energy Project EIS, in combination with the Cape Wind Environmental Assessments dated May 2010 and April 2011 (per 40 CFR

413

Draft Environmental Impact Statement for the Orlando Gasification Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE ORLANDO GASIFICATION PROJECT ORLANDO, FLORIDA August 2006 U.S. DEPARTMENT OF ENERGY COVER SHEET August 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) T ITLE Draft Environmental Impact Statement for the Orlando Gasification Project L OCATION Orlando, Florida C ONTACTS Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Mr. Richard A. Hargis, Jr., National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-6065. E-mail: Richard.Hargis@netl.doe.gov. For general information on DOE's NEPA process, contact Ms. Carol M. Borgstrom, Director, Office

414

Breakthrough Water Cleaning Technology Could Lessen Environmental Impacts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Breakthrough Water Cleaning Technology Could Lessen Environmental Breakthrough Water Cleaning Technology Could Lessen Environmental Impacts from Shale Production Breakthrough Water Cleaning Technology Could Lessen Environmental Impacts from Shale Production April 28, 2011 - 1:00pm Addthis Washington, DC - A novel water cleaning technology currently being tested in field demonstrations could help significantly reduce potential environmental impacts from producing natural gas from the Marcellus shale and other geologic formations, according to the Department of Energy's (DOE) National Energy Technology Laboratory (NETL). ABSMaterial's Osorb® technology, which uses swelling glass to remove impurities, has been shown to clean flow back water and produced water from hydraulically fractured oil and gas wells. Produced waters are by far the

415

DOE Extends Public Comment Period for Uranium Program Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Program Environmental Uranium Program Environmental Impact Statement DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement April 18, 2013 - 1:08pm Addthis Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs, (720) 377-9672, ULinfo@lm.doe.gov GRAND JUNCTION, Colo. - The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013. Under the Uranium Leasing Program, DOE's Office of Legacy Management manages 31 tracts of land in Mesa, Montrose, and San Miguel counties in Colorado - approximately 25,000 acres - that are leased to private entities for uranium and vanadium mining. No mining operations are active

416

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND 4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES . This section describes potential environmental impacts of the proposed action and alternatives. If the proposed action is implemented, activities would be limited to existing facilities. A WERF modification would be required to allow for injection of an atomized aqueous waste stream into the incinerator lower chamber. The installation would be performed within the WERF incinerator/stabilization building and may use an existing incinerator access port. Installation work would be similar to many routine maintenance and modification actions at WERF. A detailed analysis of potential impacts from processing INEL-generated LL W at commercial facilities is not presented in this EA because specific commercial facilities and processes have not

417

EIS-0473: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This EIS evaluates the potential impacts associated with DOE's Proposed Action to provide financial assistance to NRG Energy, Inc. (NRG) and with NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (Parish PCCS Project). DOE's Proposed Action would provide $167 million in cost-shared financial assistance to NRG under the Clean Coal Power Initiative (CCPI) Program to support construction and operation of NRG's Parish PCCS Project . EIS-0473-DEIS-Summary-2012.pdf EIS-0473-DEIS-VolumeI-2012.pdf EIS-0473-DEIS-VolumeII-AppendicesA-B-2012.pdf EIS-0473-DEIS-VolumeII-AppendixC-Part1-2012.pdf

418

Environmental Regulation Impacts on Eastern Interconnection Performance  

SciTech Connect

In the United States, recent environmental regulations will likely result in the removal of nearly 30 GW of oil and coal-fired generation from the power grid, mostly in the Eastern Interconnection (EI). The effects of this transition on voltage stability and transmission line flows have previously not been studied from a system-wide perspective. This report discusses the results of power flow studies designed to simulate the evolution of the EI over the next few years as traditional generation sources are replaced with environmentally friendlier ones such as natural gas and wind.

Markham, Penn N [ORNL; Liu, Yilu [ORNL; Young II, Marcus Aaron [ORNL

2013-07-01T23:59:59.000Z

419

Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.  

DOE Green Energy (OSTI)

Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

United States. Bonneville Power Administration.

1992-03-01T23:59:59.000Z

420

Environmental Impacts of Tourism in Khao Yai National Park, Thailand  

E-Print Network (OSTI)

Knowledge of visitor impacts is critical for sustainable tourism management in national parks. The focus of past tourism impact research on national parks is either on bio-physical impacts (conducted as recreation ecology research) or on social impacts (human dimensions, including environmental perception and crowding). Research integrating these two dimensions has been rarely conducted. This research aims to fill this gap through the integrative approach that attempts to understand current biophysical impacts of visitor activities in a national park, and it examines how visitors perceive these impacts. The primary objectives of this dissertation are 1) to provide a synthesis of existing of bio-physical impacts of visitor activities in the Khao Yai National Park (KYNP) and 2) to examine visitors’ perception of those impacts. Also, the factors affecting visitors’ perception are analyzed. Both qualitative and quantitative methods were used in this study. Previous impact studies conducted in KYNP were reviewed. A visitor survey was conducted between December 2008 and February 2009. The questionnaires were distributed to 628 domestic and 40 international visitors. The 38 KYNP official interviews were completed. Based on previous impact research in KYNP, the most common bio-physical impacts include soil compaction, removal of humus layer, erosion, plant damage, soil and root exposure, water quality deterioration, disturbance and feeding wildlife. Other environmental impacts include noise pollution and garbage accumulation. The results indicate that more than 30 percent of visitors do not recognize the negative results of their activities. With the exception of vegetation and water impacts, overall, visitors perceive the impacts as less severe than the actual impacts. Environmental impacts are rated differently by the KYNP officials, domestic, and international visitors. Also, significant differences were found among birders, hikers, and campers. The key factors influencing impact perceptions include income level, education level, residential location, park visitation experience, length of stay in KYNP, recreation activity, frequency of activity, group type, and group size. It is suggested that both the quality and the quantity of visitor impact research are needed to construct the body of knowledge of impacts in KYNP. A long-term impact monitoring is required to sustain the ecological integrity in KYNP.

Phumsathan, Sangsan

2010-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Draft Environmental Impact Statement Ivanpah Energy Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section 6: Summary of Impacts Section 6: Summary of Impacts SECTION 6 SUMMARY OF IMPACTS The alternatives analysis resulted in retention of the Proposed Goodsprings Plant Site (Alternative E), the Primm Plant Site (Alternative F), and the No Action Alternative for further consideration. The Proposed Goodsprings Plant Site would be located on a 30-acre parcel; an additional 10 acres would be used as a temporary laydown area. Natural gas supply to the plant would be from the KRGT pipeline which is adjacent to the plant site. Development of the site also would require improvements to the permanent northern access road and temporary southern access road and installation of a telecommunications line. The plant site, temporary laydown area, access roads, and telecommunications line

422

Reducing the environmental impact of road and rail vehicles  

Science Conference Proceedings (OSTI)

Methods have been developed to measure in situ the dynamic impact of both road and rail vehicles on the infrastructure and the environment. The resulting data sets have been analysed to quantify the environmental impacts in a transparent manner across both modes. A primary concern is that a small number of vehicles are being operated outside safe or regulatory limits which can have a disproportionate large impact. The analysis enables the various impacts to be ranked across both modes so enabling one to discern the benefits of intermodal transport. The impact of various policy options is considered and how to identify vehicles which can be classified as environmentally friendly. This would require European agreement as many heavy goods vehicle operate across country borders.

Mayer, R.M., E-mail: r.m.mayer@reading.ac.uk [Sciotech Projects, Sciotech Office, Engineering Building, University of Reading, Reading RG6 6AY (United Kingdom); Poulikakos, L.D., E-mail: lily.poulikakos@empa.ch [Empa, Swiss Federal Laboratories for Materials Science and Technology, Ueberlandstrasse 129, CH-8600 Duebendorf (Switzerland); Lees, A.R., E-mail: Andy.Lees@dft.gsi.gov.uk [Department for Transport, Statistics Roads Division, Gt. Minster House, 76 Marsham Street, London SW1P 4DR (United Kingdom); Heutschi, K., E-mail: kurt.heutschi@empa.ch [Empa, Swiss Federal Laboratories for Materials Science and Technology, Ueberlandstrasse 129, CH-8600 Duebendorf (Switzerland); Kalivoda, M.T., E-mail: kalivoda@psia.at [psiA-Consult GmbH, Lastenstrasse 38/1, A-1230 Vienna (Austria); Soltic, P., E-mail: patrik.soltic@empa.ch [Empa, Swiss Federal Laboratories for Materials Science and Technology, Ueberlandstrasse 129, CH-8600 Duebendorf (Switzerland)

2012-01-15T23:59:59.000Z

423

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

424

TITLE Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project;  

E-Print Network (OSTI)

CONTACT Additional copies or information concerning this final environmental impact statement (EIS) can be

unknown authors

2000-01-01T23:59:59.000Z

425

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft WWEC PEIS September 2007 Draft WWEC PEIS September 2007 i DOCUMENT CONTENTS VOLUME I Executive Summary Chapter 1: Why Are Federal Agencies Proposing to Designate Energy Corridors in the West? Chapter 2: What Are the Alternatives Evaluated in This PEIS? Chapter 3: What Are the Potential Environmental Consequences of Corridor Designation and Land Use Plan Amendment? Chapter 4: How Are Cumulative Impacts Evaluated? Chapter 5: What Unavoidable Adverse Impacts Might Be Caused by Corridor Designation and Land Use Plan Amendment? Chapter 6: The Relationship between Local Short-Term Uses of the Environment and Long-Term Productivity Chapter 7: What Irreversible and Irretrievable Commitment of Resources Would Be Involved with Implementation of the Alternatives? Chapter 8: List of Preparers

426

Sacramento Municipal Utility District, 100-MW photovoltaic power plant: draft environmental impact report  

SciTech Connect

The Sacramento Municipal Utility District proposes constructing a 100 MW solar photovoltaic electric generation facility adjacent to its Rancho Seco nuclear plant. After a brief description of the proposed facility, including the location and an explanation of the need for it, the project-specific environmental analysis is presented. This addresses: geology/seismicity, soils, biological resources, land use, air quality, water resources, water quality, wastes management, public/occupational health, safety, energy and material resources, cultural resources, socioeconomics, and aesthetics. For each of these areas, the setting is described, impacts analyzed, mitigation measures given where appropriate, and cumulative impacts described. Unavoidable adverse environmental effects, irreversible environmental changes and irretrievable commitments of energy and materials are summarized. Also briefly summarized is the relationship between local short-term use of the environment and the maintenance and enhancement of long-term productivity. Environmental benefits and disadvantages associated with various alternatives to building and operating the proposed solar photovoltaic power plant are described, considering project objectives other than producing electricity. (LEW)

Not Available

1982-02-01T23:59:59.000Z

427

Risk time-window specification and its impact on the assessment of medication-related adverse events.  

E-Print Network (OSTI)

??Post-marketing studies using medical administrative databases are often conducted to assess medication-related adverse events (AE). The determination of the risk time-window, defined as the period… (more)

Cournoyer, Daniel.

2006-01-01T23:59:59.000Z

428

EIS-0458: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0458: Final Environmental Impact Statement EIS-0458: Final Environmental Impact Statement EIS-0458: Final Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA The US Department of Energy is proposing to issue a loan guarantee to Royal Bank of Scotland to provide funding to Topaz Solar Farms, Limited Liability Corporation (LLC) to construct and start up the Topaz Solar Farm, a nominal 550-megawatt photovoltaic solar energy generating facility. The facility would be located in unincorporated eastern San Luis Obispo County, California, approximately one mile north of the community of California Valley and six miles northwest of the Carrizo Plain National Monument. The proposed facility would consist of a solar field of ground-mounted PV

429

EIS-0407: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0407: Draft Environmental Impact Statement Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement with Abengoa Bioenergy to provide approximately $85 million of the total anticipated cost of approximately $300 million (2008 dollars). The biorefinery would use lignocellulosic biomass (corn stover, wheat straw) as feedstock to produce ethanol and biopower (electricity) sufficient to meet the needs of

430

EIS-0201: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

201: Final Environmental Impact Statement 201: Final Environmental Impact Statement EIS-0201: Final Environmental Impact Statement Coyote Springs Cogeneration Project and Portland General Electric Company's Request for Transmission Service The Coyote Springs Cogeneration Project is a proposed natural gas-fired cogeneration power plant near Boardman, Oregon. The proposed power plant would be built on a g-hectare (22-acre) site in the Port of Morrow Industrial Park. The plant would have two combustion turbines that would generate 440 average megawatts of energy when completed. The proposed plant would be built in phases. EIS-0201-FEIS-Summary-1994_0.pdf DOE/EIS-0201, Bonneville Power Administration, Coyote Springs Cogeneration Project - Administrator's Record of Decision on Portland General Electric

431

EIS-0433: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0433: Final Environmental Impact Statement Keystone XL Project Summary: The U.S. Department of State has issued the Final EIS for the Keystone XL Project. The proposed action is to construct and operate a crude oil pipeline and related facilities at the international border and continuing into the United States to transport Western Canadian Sedimentary Basin crude oil and other crude oils to a proposed tank farm in Cushing, Oklahoma, and to delivery points in Point Arthur and east Houston areas of Texas. The proposed pipeline would traverse Montana, South Dakota, Nebraska, Oklahoma, and Texas, with localized facilities constructed on an existing segment of pipeline in Kansas. DOE's Western Area Power Administration participated as a cooperating

432

EIS-0286: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington DOE needs to provide capabilities to continue, or modify, the way it treats, stores, and/or disposes of existing and anticipated quantities of solid LLW, MLLW, TRU waste, and ILAW at the Hanford Site in order to protect human health and the environment; facilitate cleanup at Hanford and other DOE facilities; take actions consistent with decisions reached by DOE under the WM PEIS; comply with local, State, and federal laws and regulations; and meet other obligations such as the Hanford Federal Facility Agreement and Consent Order (also referred to as the Tri-Party Agreement, or TPA) (Ecology et al. 1989).

433

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422: Draft Environmental Impact Statement 422: Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

434

Final Environmental Impact Statement - Plutonium Finishing Plant Stabilization, May 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Plutonium Finishing Plant Stabilization, May 1996 - Plutonium Finishing Plant Stabilization, May 1996 file:///I|/Data%20Migration%20Task/EIS-0244-FEIS-1996/eis0244f_1.html[6/27/2011 2:33:34 PM] 1.0 INTRODUCTION This Introduction contains the following information: Background of the Plutonium Finishing Plant Facility Scope of this Environmental Impact Statement Contents of this Environmental Impact Statement The presence of significant quantities of plutonium-bearing materials in the Plutonium Finishing Plant (PFP) Facility, Hanford Site, Washington, poses unacceptable risks to workers, the public, and the environment. On October 24, 1994, the United States Department of Energy (DOE) announced, in an initial mailing to 1,500 interested parties, its intent to prepare an Environmental Impact Statement (EIS) pursuant to the National

435

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 EFSEC Washington State Energy Facility Site Evaluation Council September 5, 2003 Dear Reader: Enclosed for your review is the Draft Environmental Impact Statement (DEIS) for the proposed BP Cherry Point Cogeneration Project. The proponent, BP West Coast Products, LLC, has requested to build a 720-Megawatt Gas-Fired Combined Cycle Cogeneration Facility in Whatcom County, Washington, and interconnect this facility into the regional power transmission grid. To integrate the new power generation into the transmission grid, Bonneville Power Administration (Bonneville) may need to re-build 4.7 miles of an existing 230-kV

436

Final Supplemental Environmental Impact Statement for a Geologic Repository  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Nevada Rail - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final Env Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada -- Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final Env The Summary of the Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada -- Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County,

437

EIS-0201: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Final Environmental Impact Statement 1: Final Environmental Impact Statement EIS-0201: Final Environmental Impact Statement Coyote Springs Cogeneration Project and Portland General Electric Company's Request for Transmission Service The Coyote Springs Cogeneration Project is a proposed natural gas-fired cogeneration power plant near Boardman, Oregon. The proposed power plant would be built on a g-hectare (22-acre) site in the Port of Morrow Industrial Park. The plant would have two combustion turbines that would generate 440 average megawatts of energy when completed. The proposed plant would be built in phases. EIS-0201-FEIS-Summary-1994_0.pdf DOE/EIS-0201, Bonneville Power Administration, Coyote Springs Cogeneration Project - Administrator's Record of Decision on Portland General Electric

438

EIS-0395: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio Colorado (SLRC) Power Center, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company's (APS') North Gila Substation. The Proposed Project would require an expansion of Gila Substation and additional equipment at North Gila Substation; all of the proposed transmission components would be located in Yuma County, Arizona. Depending on the route ultimately selected, the total length of the 500-kV transmission system within the United States would be approximately 25.7 miles-21 miles from the United States-Mexico border to Gila Substation

439

EIS-0365: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0365: Final Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines A U.S. Department of Energy (DOE) Presidential permit is required to construct, operate, maintain, and connect an electric transmission line across the U.S.-Mexico border. On February 27, 2001, Baja California Power, Inc., InterGen Aztec Energy, V.B.V. (hereafter referred to as Intergen), filed an application with DOE, Office of Fossil Energy, for a Presidential permit for a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border. EIS-0365-FEIS-01-2004.pdf EIS-0365-FEIS-02-2004.pdf EIS-0365-FEIS-FiguresTables-2004.pdf

440

Striving to Reduce Environmental Impact Inside and Out | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Striving to Reduce Environmental Impact Inside and Out Striving to Reduce Environmental Impact Inside and Out Striving to Reduce Environmental Impact Inside and Out November 2, 2010 - 12:00pm Addthis The 112-panel solar photovoltaic system at Parker River National Wildlife Refuge's visitor center and administrative building generates about 35% of the facility’s average electricity needs. | Photo courtesy of Parker River National Wildlife Refuge The 112-panel solar photovoltaic system at Parker River National Wildlife Refuge's visitor center and administrative building generates about 35% of the facility's average electricity needs. | Photo courtesy of Parker River National Wildlife Refuge Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? 112 panel solar generates about 35% of the building's electricity

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EIS-0247: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0247: Final Environmental Impact Statement Construction and Operation of the Spallation Neutron Source The United States needs a high-flux, short- pulsed neutron source to provide its scientific and industrial research communities with a much more intense source of pulsed neutrons for neutron scattering research than is currently available. This source would assure the availability of a state-of-the-art neutron research facility in the United States in the decades ahead. This facility would be used to conduct research in areas such as materials science, condensed matter physics, the molecular structure of biological materials, properties of polymers and complex fluids, and magnetism. In addition to creating new scientific and

442

MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MESABA ENERGY PROJECT MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 DOE/EIS-0382D MN PUC DOCKET # E6472/GS-06-668 U.S. Department of Energy in cooperation with Minnesota Department of Commerce Office of Fossil Energy National Energy Technology Laboratory NOVEMBER 2007 COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Responsible State Agency: Minnesota Department of Commerce (MDOC) Cooperating Agencies: U.S. Army Corps of Engineers and U.S. Department of Agriculture Forest Service Title: Mesaba Energy Project, Draft Environmental Impact Statement (DOE/EIS-0382D) Location: Taconite Tax Relief Area of northeastern Minnesota, Itasca and St. Louis Counties Contact: For further information about this Environmental Impact Statement, contact:

443

ADOPTION OF ENVIRONMENTAL ASSESSMENT and FINDING OF NO SIGNIFICANT IMPACT;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADOPTION OF ENVIRONMENTAL ASSESSMENT and FINDING OF NO SIGNIFICANT IMPACT; ADOPTION OF ENVIRONMENTAL ASSESSMENT and FINDING OF NO SIGNIFICANT IMPACT; DETERMINATION OF NO SIGNIFICANT IMPACT DOE/EA-1868: MANHATTAN PROJECT SITES Los Alamos, New Mexico; Hanford, Washington; Oak Ridge, Tennessee; Dayton, Ohio BACKGROUND: 'The National Park Service (NPS) issued an Environmental Assessment (September 2010) in consultation with DOE for a proposed action of recommending that Congress authorize an innovative Manhattan Project National Historical Park. The Park Service selected an alternative for the proposed park that includes publicly and privately owned facilities in Oak Ridge, Tennessee; Los Alamos, New Mexico; and the Hanford, Washington area. 'The boundaries of the national historical park would be defined by enabling legislation and refined by the general management planning

444

EIS-0310: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Draft Programmatic Environmental Impact Statement 10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these responsibilities, DOE maintains nuclear infrastructure capabilities that support various missions. Current estimates for the future needs of medical and industrial isotopes, plutonium-238, and research requirements indicate that the current infrastructure may soon be insufficient to meet the projected demands. DOE proposes to enhance these

445

EIS-0285: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Final Environmental Impact Statement : Final Environmental Impact Statement EIS-0285: Final Environmental Impact Statement Transmission System Vegetation Management Program Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure I-1). The seven states offer a great diversity of vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and neighboring members of the public, and interfere with our ability to maintain these facilities. We need to keep vegetation a safe distance away from our electric power facilities and control noxious weeds at our

446

EIS-0360: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0360: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah, Kentucky. DOE intends to use the proposed facilities to convert its inventory of DUF6 to a more stable chemical form suitable for beneficial use or disposal. This site-specific EIS analyzes the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed DUF6 conversion facility at three

447

EIS-0476: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0476: Final Environmental Impact Statement EIS-0476: Final Environmental Impact Statement EIS-0476: Final Environmental Impact Statement Vogtle Electric Generating Plant, Units 3 and 4, Issuance of a Loan Guarantee to Support Funding for Construction, Burke County, GA The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to several applicants to support funding for construction and start-up of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, an advanced nuclear generating facility for the production of electric power (the Project). The VEGP Units 3 and 4 would be located in a rural area in eastern Burke County, Georgia, which is already the site of two operating nuclear reactor units (VEGP Units 1 and 2). Georgia Power Corporation (GPC), Oglethorpe Power Corporation (OPC), and the Municipal Electric

448

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

449

EIS-0407: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0407: Final Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement with Abengoa Bioenergy to provide up to $71 million, subject to annual appropriations, of the total anticipated cost of approximately $685 million (2009 dollars). The biorefinery would use lignocellulosic biomass (corn stover, wheat straw) as feedstock to produce ethanol and biopower (electricity)

450

EIS-0440: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0440: Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment (November 2011) Quartzsite Solar Energy proposes to construct a 100-megawatt solar-powered electrical generation facility in La Paz County, Arizona.The proposed project would use a solar field made up of heliostats, which are a collection of mirrors, a 653-foot tower to capture and concentrate the sun's heat to make steam, and a thermal energy storage system. Steam produced by the facility would power traditional steam turbine generators. The project is proposed for an area about 10 miles north of Quartzsite and adjacent to Arizona State Route 95. The generation plant, power line and

451

EPA Launches New Online Mapping Tool for Environmental Impact Statements |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Launches New Online Mapping Tool for Environmental Impact Launches New Online Mapping Tool for Environmental Impact Statements EPA Launches New Online Mapping Tool for Environmental Impact Statements September 10, 2013 - 6:11pm Addthis Streets Imagery Topography Go To: Select a State/Territory Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware District of Columbia Florida Georgia Hawaii Idaho Illinois Indiana Iowa Kansas Kentucky Louisiana Maine Maryland Massachusetts Michigan Minnesota Mississippi Missouri Montana Nebraska Nevada New Hampshire New Jersey New Mexico New York North Carolina North Dakota Ohio Oklahoma Oregon Pennsylvania Rhode Island South Carolina South Dakota Tennessee Texas Utah Vermont Virginia Washington West Virginia Wisconsin Wyoming American Samoa Federated States of Micronesia Guam

452

EIS-0456: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0456: Final Environmental Impact Statement Cushman Hydroelectric Project (FERC Project No. 460) DOE is proposing to provide cost-shared, American Recovery and Reinvestment Act of 2009 funding for a project proposed by the City of Tacoma, Department of Public Utilities, Light Division. DOE funds would support improvements to the existing 131 megawatt (MW) Cushman Hydroelectric Project, namely the design and construction of a new North Fork Skokomish Powerhouse (Powerhouse) and associated infrastructure, which would include an integral fish collection facility for fish handling and sorting, and equipment for electrical interconnection. The Powerhouse would produce about 23,500 MW hours of energy. The associated fish transport system would

453

EIS-0378: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Final Environmental Impact Statement : Final Environmental Impact Statement EIS-0378: Final Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has applied to DOE for authorizations and approvals necessary to construct the United States (U.S.) portion of an international electric power transmission cable. Sea Breeze's proposed cable would extend from the greater Victoria area (View Royal), British Columbia, Canada, across the Strait of Juan de Fuca to Port Angeles, Clallam County, WA, U.S. The U.S. portion is called the Port Angeles-Juan de Fuca Transmission Project. Sea Breeze has applied to DOE/OE for a Presidential permit to construct, operate, maintain, and connect the proposed cable across the U.S.-Canada international border.

454

EIS-0232: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0232: Final Environmental Impact Statement Power Marketing Program The Sierra Nevada Region needs to determine the level and character of capacity, energy, and other services that will be marketed beyond 2004. These services would be developed by combining potential hydropower operating approaches with power purchases. The Sierra Nevada Region also needs to establish eligibility and allocation criteria for the allocations of electric power resources to be marketed under contracts that will replace those expiring in 2004. EIS-0232-FEIS-Summary-1999.pdf DOE/EIS-0232, Western Area Power Administration, Nevada (1999) EIS-0232-FEIS-02-1999.pdf EIS-0232-FEIS-Figures-1999.pdf More Documents & Publications EIS-0232: Record of Decision

455

EIS-0340: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0340: Final Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project The Bonneville Power Administration (BPA) has a responsibility to protect, mitigate, and enhance fish and wildlife affected by the Federal Columbia River Power System (Northwest Power Act, 16 U.S.C. § 839 et seq). One species covered by that mandate is the Snake River spring/summer chinook salmon listed as threatened under the Endangered Species Act (ESA). BPA is now evaluating whether to provide funding for final design, property acquisition, construction, modification, operation, and maintenance of facilities to better implement existing, pre-approved programs of hatchery fish production for Snake River spring/summer chinook native to the Grande

456

EIS-0378: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0378: Draft Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to Bonneville Power Administration (BPA), another organizational unit within DOE, for interconnection into the federal transmission system. EIS-0378-DEIS-Summary-2007.pdf

457

EIS-0399: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at the existing NorthWestern Energy (NWE) 230-kV Switchyard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately 130 miles of the 203-mile transmission line are proposed to be constructed in the U.S. The line would be constructed and owned by MATL, a private Canadian corporation owned by Tonbridge Power. The proposed line would be part of the Western

458

EIS-0194: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0194: Final Environmental Impact Statement EIS-0194: Final Environmental Impact Statement EIS-0194: Final Environmental Impact Statement Tenaska Washington II Generation Project, Washington BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the

459

EIS-0213: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13: Final Environmental Impact Statement 13: Final Environmental Impact Statement EIS-0213: Final Environmental Impact Statement Nez Perce Tribal Hatchery Program Bonneville Power Administration, the Bureau of Indian Affairs, and the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Final EIS includes a new alternative suggested by commentors to the Draft EIS. In the Proposed Action, the Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Spring and fall chinook salmon would be reared and acclimated to different areas in the Subbasin and released at the hatchery and satellite sites or in other

460

DOE Hydrogen Analysis Repository: Potential Environmental Impacts of  

NLE Websites -- All DOE Office Websites (Extended Search)

Potential Environmental Impacts of Hydrogen-Based Transportation & Power Potential Environmental Impacts of Hydrogen-Based Transportation & Power Systems Project Summary Full Title: Potential Environmental Impacts of Hydrogen-Based Transportation & Power Systems Project ID: 245 Principal Investigator: Thomas Grieb Brief Description: The goal of this project is to analyze the effects of emissions of hydrogen, the six criteria pollutants and greenhouse gases on climate, human health, ecosystems, and structures. Purpose The overall goal of the project is to compare emissions of hydrogen, the six criteria pollutants (CO, SOX, NO2, particulate matter, ozone, and lead), and greenhouse gases from near- and long-term methods of generating hydrogen for vehicles and stationary power systems, and the effects of those emissions on climate, human health, the ecosystem, and structures.

Note: This page contains sample records for the topic "adverse environmental impacts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

EIS-0459: Hawaii Clean Energy Programmatic Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Hawaii Clean Energy Programmatic Environmental Impact 9: Hawaii Clean Energy Programmatic Environmental Impact Statement EIS-0459: Hawaii Clean Energy Programmatic Environmental Impact Statement Summary In 2010, DOE announced its intent to prepare a PEIS for the Hawai'I Interisland Renewable Energy Program (HIREP): Wind (DOE/EIS-0459). In response to public scoping comments, as well as regulatory and policy developments since the scoping meetings, DOE proposes to broaden the range of energy efficiency and renewable energy activities and technologies to be analyzed in the PEIS and, accordingly, has renamed it the Hawai'i Clean Energy PEIS. DOE's proposal involves the development of guidance to use in future funding decisions and other actions to support Hawai'i in achieving the goal established in the Hawai'i Clean Energy Initiative

462

EIS-0458: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0458: Final Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA The US Department of Energy is proposing to issue a loan guarantee to Royal Bank of Scotland to provide funding to Topaz Solar Farms, Limited Liability Corporation (LLC) to construct and start up the Topaz Solar Farm, a nominal 550-megawatt photovoltaic solar energy generating facility. The facility would be located in unincorporated eastern San Luis Obispo County, California, approximately one mile north of the community of California Valley and six miles northwest of the Carrizo Plain National Monument. The proposed facility would consist of a solar field of ground-mounted PV

463

EIS-0422: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422: Final Environmental Impact Statement 422: Final Environmental Impact Statement EIS-0422: Final Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA lines in the area. Two of the routing alternatives for the transmission line are about 38 miles long, and the other two are about 40 miles long.

464

EIS-0421: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0421: Draft Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA BPA is considering three routing alternatives and a no action alternative for the proposed transmission line. The transmission line routing alternatives all would use a combination of existing BPA and new 150 foot wide right-of-way. The routing alternatives range from about 27 to 28 miles long. BPA is considering different tower combination options (single-circuit and double-circuit) including paralleling existing transmission lines. Two substation sites are being considered for the proposed Knight Substation; the sites are on adjacent properties along an existing BPA transmission line. Two fiber optic cable options are also

465

EIS-0488: Notice of Availability Draft Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: Notice of Availability Draft Environmental Impact 488: Notice of Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest. EIS-0488-DEIS-NOA-2014.pdf More Documents & Publications

466

EIS-0418: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0418: Draft Environmental Impact Statement South Dakota PrairieWinds Project, Deer Creek Station Energy Facility Project, Brookings County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to provide interconnection services, and Rural Utilities Service (RUS) proposes to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility. The facility is being proposed to meet projected intermediate demands for electricity in the eastern portion of Basin Electric Power Cooperative's service territory, as determined from a power supply analysis. Basin Electric's alternatives analysis included alternative power generation

467