Powered by Deep Web Technologies
Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Form EIA-920 - 2005  

U.S. Energy Information Administration (EIA) Indexed Site

Administration Administration Form EIA-920 (2004/2005) COMBINED HEAT AND POWER PLANT REPORT INSTRUCTIONS Form Approval OMB No. 1905-0129 Approval Expires: 11/30/2007 PURPOSE Form EIA-920 Combined Heat and Power Plant Report collects information from combined heat and power (CHP) plants in the United States. Data collected on this form include electric power generation, fuel consumption, fuel heat content, and fossil fuel stocks. These data are used to monitor the status and trends of the electric power industry, and appear in many EIA publications, including: Electric Power Monthly and Annual, Monthly and Annual Energy Reviews, Natural Gas Monthly and Annual, Quarterly Coal Report, and the Renewable Energy Annual. Further information can be found at

2

Form EIA-920 - 2005  

U.S. Energy Information Administration (EIA) Indexed Site

20 (2004/2005) 20 (2004/2005) |COMBINED HEAT AND POWER PLANT REPORT INSTRUCTIONS|Form Approval OMB No. 1905-0129 Approval Expires: 11/30/2007 | |PURPOSE|Form EIA-920 Combined Heat and Power Plant Report collects information from combined heat and power (CHP) plants in the United States. Data collected on this form include electric power generation, fuel consumption, fuel heat content, and fossil fuel stocks. These data are used to monitor the status and trends of the electric power industry, and appear in many EIA publications, including: Electric Power Monthly and Annual, Monthly and Annual Energy Reviews, Natural Gas Monthly and Annual, Quarterly Coal Report, and the Renewable Energy Annual. Further information can be found at

3

Form EIA-906, EIA-920, and EIA-923 Databases | OpenEI  

Open Energy Info (EERE)

906, EIA-920, and EIA-923 Databases 906, EIA-920, and EIA-923 Databases Dataset Summary Description The EIA-906, EIA-920, EIA-923 and predecessor forms provide monthly and annual data on generation and fuel consumption at the power plant and prime mover level. A subset of plants, steam-electric plants 10 MW and above, also provides boiler level and generator level data. Data for utility plants are available from 1970, and for non-utility plants from 1999. Beginning with January 2004 data collection, the EIA-920 was used to collect data from the combined heat and power plant (cogeneration) segment of the non-utility sector; also as of 2004, nonutilities filed the annual data for nonutility source and disposition of electricity. Beginning in 2007, environmental data was collected on Schedules 8A - 8F of the Form 923 and includes by-product

4

EIA - 2008 New Electric Power EIA-923 Form  

U.S. Energy Information Administration (EIA) Indexed Site

Plant Report Form EIA-920 - Combined Heat and Power Plant Report Form EIA-423 - Monthly Cost and Quality of Fuels for Electric Plants FERC Form 423 - Monthly Report of Cost and...

5

U.S. Energy Information Administration | Natural Gas Annual  

U.S. Energy Information Administration (EIA) Indexed Site

2 2 13.0 11.7 10.8 8.0 5.9 0 2 4 6 8 10 12 14 16 2008 2009 2010 2011 2012 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-64A, "Annual Report of the Origin of Natural Gas Liquids Production"; Office of Fossil Energy, U.S. Department of Energy, Natural Gas Imports and Exports; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-906, "Power Plant Report"; Form EIA-920, "Combined Heat and Power Plant Report"; Form EIA- 923, "Power Plant Operations Report"; Form EIA-886, "Annual Survey of Alternative Fueled Vehicles"; state agencies; and EIA estimates based on historical data.

6

Change Request Forms | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Change Request Forms | National Nuclear Security Administration Change Request Forms | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Change Request Forms Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Change Request Forms Change Request Forms

7

Sample Forms | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

NMMSS Information, Reports & Forms Sample Forms Sample Forms U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards...

8

Security Forms | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

NMMSS Information, Reports & Forms Security Forms Security Forms U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards...

9

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Erosion Control Project along Transmission Line 3016, Structure 31 Erosion Control Project along Transmission Line 3016, Structure 31 Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Muskogee County, Oklahoma Proposed Action Description: Southwestern Power Administration (Southwestern) proposes to initiate a project to prevent water erosion around transmission line 3016, structure number 31 located in Muskogee County, Oklahoma. The structure foundation is being eroded by water runoff and streambed washout activities within an unnamed tributary of the Canadian River. Categorical Exclusion(s) Applied: 10 CFR 1021 , Appendix B to Subpart D, Part B 1.33- Stormwater runoff control. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

10

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Associated Electric Cooperative, Inc. Substation Improvements Associated Electric Cooperative, Inc. Substation Improvements Program or Field Office: Southwestern Power Administration Location{s) (City/County/State): Springfield, Missouri, Greene County Proposed Action Description: Associated Electric Cooperative, Inc. proposes to install new underground conduit and cable in Southwestern Power Administrations' Springfield, Missouri electrical substation. Categorical ExciusionCs) Al'l'lied: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions and modifications to electric power transmission facilities within a previously disturbed or developed facility . For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021.

11

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Associated Electric Cooperative, Inc. Substation Improvements Associated Electric Cooperative, Inc. Substation Improvements Program or Field Office: Southwestern Power Administration Location{s) (City/County/State): Springfield, Missouri, Greene County Proposed Action Description: Associated Electric Cooperative, Inc. proposes to install new underground conduit and cable in Southwestern Power Administrations' Springfield, Missouri electrical substation. Categorical ExciusionCs) Al'l'lied: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions and modifications to electric power transmission facilities within a previously disturbed or developed facility . For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021.

12

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Line Relocation Project for Farrell Cooper Mining Company Line Relocation Project for Farrell Cooper Mining Company Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Stigler, Haskell County, Oklahoma Proposed Action Description: Farrell Cooper Mining Company (FCMC) proposes to require the relocation of a portion of Southwestern Power Administration's transmission line number 3016 to accommodate FCMCs coal mining activity in the area. Categorical Exclusion(s) Applied: 10 CFR 1021 , Appendix B to Subpart D, Part B4.l3- Upgrading or rebuilding approximately 20 miles in length or less of existing electric powerlines, which may involve minor relocations of small segments of the powerlines. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

13

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Erosion Control Project along Transmission Line 3016, Structure 31 Erosion Control Project along Transmission Line 3016, Structure 31 Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Muskogee County, Oklahoma Proposed Action Description: Southwestern Power Administration (Southwestern) proposes to initiate a project to prevent water erosion around transmission line 3016, structure number 31 located in Muskogee County, Oklahoma. The structure foundation is being eroded by water runoff and streambed washout activities within an unnamed tributary of the Canadian River. Categorical Exclusion(s) Applied: 10 CFR 1021 , Appendix B to Subpart D, Part B 1.33- Stormwater runoff control. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

14

Southwestern Power Administration Categorical Exclusion Determination Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Relocation Project for Farrell Cooper Mining Company Line Relocation Project for Farrell Cooper Mining Company Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Stigler, Haskell County, Oklahoma Proposed Action Description: Farrell Cooper Mining Company (FCMC) proposes to require the relocation of a portion of Southwestern Power Administration's transmission line number 3016 to accommodate FCMCs coal mining activity in the area. Categorical Exclusion(s) Applied: 10 CFR 1021 , Appendix B to Subpart D, Part B4.l3- Upgrading or rebuilding approximately 20 miles in length or less of existing electric powerlines, which may involve minor relocations of small segments of the powerlines. For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the

15

Employee Concerns Reporting Form | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Reporting Form | National Nuclear Security Administration Reporting Form | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Operations > Management and Budget > Human Resources > Employee Concerns Program > How Do You Report A Concern? > Employee Concerns Reporting Form Employee Concerns Reporting Form Employee Concerns Program Policy Statement

16

Management & Administration Forms (0000-1999) | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management & Administration Forms (0000-1999) Management & Administration Forms (0000-1999) Management & Administration Forms (0000-1999) DOE F 206.4 (fillable pdf) Information Sheet for Sponsorship of HSPD-12 Credential DOE F 241.2 (fillable pdf) Notice of Energy RD&D Project DOE F 241.4 (fillable pdf) Announcement of Computer Software DOE F 243.2 (fillable pdf) Records Scheduling Request DOE F 243.3 (fillable pdf) Records Contact Appointment DOE F 243.4(fillable pdf) Contractor Records Custodian Authorization DOE F 280.1 (pdf) Inventions Made by Government Employees Executive Order 10096 DOE F 284 (pdf) Nuclear Material Transfer Report DOE F 321.1 (pdf) Service Agreement for an Overseas Position DOE F 331.2 (fillable pdf) Senior Executive Service Performance Appraisal Download SES Form only (Word)

17

Davison Health Center IMMUNIZATION ADMINISTRATION AND CONSENT FORM  

E-Print Network [OSTI]

HealthCare to release medical or other information necessary to bill my Medicare or insurance planDavison Health Center IMMUNIZATION ADMINISTRATION AND CONSENT FORM Last Name: First Name: MI: Student only - Wesleyan ID: Wesleyan Employees/Dependents Wesleyan Students __ Health Insurance Eligible

Royer, Dana

18

U.S. General Services Administration - Form SF299 | Open Energy...  

Open Energy Info (EERE)

Administration - Form SF299 Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: U.S. General Services Administration - Form SF299 Abstract This form is an...

19

Summary of the Fall 2004 ASA Meeting  

U.S. Energy Information Administration (EIA) Indexed Site

8 and 29, 2004 8 and 29, 2004 with the Energy Information Administration 1000 Independence Ave., SW. Washington, D.C. 20585 Thursday, October 28, 2004 1. EIA Program to Evaluate Form EIA-920, Combined Heat and Power Plant Report, Robert Rutchik, SMG, EIA In early 2004, EIA disseminated the new survey, Form EIA-920, Combined Heat and Power Plant (CHP) Report to CHP facilities to collect data on their total fuel used, fuel used to generate electricity, generation, and fossil fuel stocks. The survey's primary purpose was to collect fuel used to generate electricity. It should be less than facilities total fuel used. The EIA-920 evaluation was part of EIA's new survey quality self-assessment program and it had three major purposes: Do respondents understand the primary concept that reported total

20

National Nuclear Security Administration Categorical Exclusion Determination Form  

National Nuclear Security Administration (NNSA)

National Nuclear Security Administration National Nuclear Security Administration Categorical Exclusion Determination Form NEPA ID#: Proposed Action Title: Program or Field Office: Location(s) (City/County/State): Proposed Action Description: Categorical Exclusion(s) Applied: For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) The proposal fits within a class of actions that is listed in Appendix A or B to 10 CFR Part 1021, Subpart D. To fit within the classes of actions listed in 10 CFR Part 1021, Subpart D, Appendix B, a proposal must be one that would not: (1) threaten

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

PURPOSE The Energy Information Administration (EIA) Form EIA-820,  

E-Print Network [OSTI]

Annual Refinery Report, is used to collect data on current and projected capacities of all operable petroleum refineries. The data appear on EIAs website at www.eia.doe.gov and in numerous government publications. WHO MUST SUBMIT Form EIA-820 is mandatory pursuant to Section 13 (b) of the Federal Energy Administration Act of 1974 (Public Law 93-275) and must be completed by all operating and idle petroleum refineries (including new refineries under construction) and refineries shutdown during the previous year, located in the 50

unknown authors

22

A1. Form EIA-176 Figure Energy Information Administration  

Gasoline and Diesel Fuel Update (EIA)

Form EIA-176 Form EIA-176 Figure Energy Information Administration / Natural Gas Annual 1996 214 EIA-176, ANNUAL REPORT OF NATURAL AND SUPPLEMENTAL GAS SUPPLY AND DISPOSITION, 19 PART IV: SUPPLY OF NATURAL AND SUPPLEMENTAL GAS RECEIVED WITHIN OR TRANSPORTED INTO REPORT STATE RESPONDENT COPY Page 2 PART III: TYPE OF COMPANY AND GAS ACTIVITIES OPERATED IN THE REPORT STATE 1.0 Type of Company (check one) 1.0 Control No. 2.0 Company Name 3.0 Report State 4.0 Resubmittal EIA Date: a b c d e Investor owned distributor Municipally owned distributor Interstate pipeline Intrastate pipeline Storage operator f g h i j SNG plant operator Integrated oil and gas Producer Gatherer Processor k Other (specify) 2.0 Gas Activities Operated On-system Within the Report State (check all that apply) a b c d e Produced Natural Gas

23

DOE/NRC Forms | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

NMMSS Information, Reports & Forms DOENRC Forms DOENRC Forms U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards...

24

National Nuclear Security Administration Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion Determination Form Categorical Exclusion Determination Form NEPA ID#: Proposed Action Title: Program or Field Office: Location(s) (City/County/State): Proposed Action Description: Categorical Exclusion(s) Applied: For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) The proposal fits within a class of actions that is listed in Appendix A or B to 10 CFR Part 1021, Subpart D. To fit within the classes of actions listed in 10 CFR Part 1021, Subpart D, Appendix B, a proposal must be one that would not: (1) threaten

25

Training Request Form Administration Training Services, Organizational Effectiveness/OHR 612-626-1373 ULearn  

E-Print Network [OSTI]

Training Request Form Administration Training Services, Organizational Effectiveness/OHR · 612-626-1373 ULearn www.umn.edu/ohr/trainingservices 5-17-12 A Training Request Forms are designed to obtain additional information from a learner when requesting training in ULearn. The Training Request Form

Minnesota, University of

26

The Energy Information Administration is proposing the following revisions to their electricity survey forms in 2011:  

U.S. Energy Information Administration (EIA) Indexed Site

Energy Information Administration proposed the following revisions to their electricity Energy Information Administration proposed the following revisions to their electricity survey forms in 2011: F or m E I A -411, " C oor dinated B ulk Power Supply Pr ogr am R epor t." * Change form name to "Coordinated Bulk Power Supply & Demand Program Report;" return to collecting projected reliability data on a 10-year basis as opposed to 5 years. Change "Council" to "Regional Entity" and add submission of Sub-regional level breakout of data. * Return to reporting on capacity and transmission planning for a 10-year horizon, rather than a 5-year horizon. * Adopt the current NERC 2009 Schedule 3 for summer and winter aggregated demand and supply information. Changes are as follows: Demand category additions include

27

U.S. Department of Energy Form Approved: XX/XX/XXXX U.S. Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

XX/XX/XXXX XX/XX/XXXX U.S. Energy Information Administration OMB No. XXXX-XXXX 1000 Independence Ave., S.W. Expiration Date: XX/XX/XXXX Washington, DC 20585 Burden: 6.0 hours PURPOSE REQUIRED RESPONDENTS * Entities importing power into the U.S. and exporting power out of the U.S. at wholesale. * Organizations that have U.S. treaty obligations involving the exchange of power between the U.S. and Canada or Mexico. DUE DATE HOW TO FILE A RESPONSE QUESTIONS For questions or additional information regarding the Form EIA-111, contact the Survey Manager: Name: Michelle Bowles

28

GC-859 Energy Information Administration Form Approved Revised (05/2013) U.S. DEPARTMENT OF ENERGY OMB NO. 1901-0287  

U.S. Energy Information Administration (EIA) Indexed Site

GC-859 Energy Information Administration Form Approved GC-859 Energy Information Administration Form Approved Revised (05/2013) U.S. DEPARTMENT OF ENERGY OMB NO. 1901-0287 Average Burden 67.5 Hours Expiration Date: 04/30/2016 NUCLEAR FUEL DATA SURVEY FORM GC-859 Legislative Authority: Data on this mandatory form are collected under authority of the Federal Energy Administration Act of 1974 (15 USC Schedule 761 et seq.), and the Nuclear Waste Policy Act of 1982, as amended (42 USC 10101 et seq.). Failure to file after receiving Energy Information Administration (EIA) notification may result in criminal fines, civil penalties and other sanctions as provided by the law. Data being collected on this form are not considered to be confidential. Title 18 U.S.C. 1001 makes it a criminal offense for any person knowingly and willingly to

29

Forms  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

are in .pdf format) After Hours Access Policy After Hours Request Form Cleanroom Access Procedures for New Users Deposition Request Form Exit Form Flycutting Request Form Hot...

30

Microsoft Word - figure_06_07.doc  

Gasoline and Diesel Fuel Update (EIA)

16.0 16.4 13.0 11.7 11.0 0 2 4 6 8 10 12 14 16 18 20 22 2006 2007 2008 2009 2010 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-64A, "Annual Report of the Origin of Natural Gas Liquids Production"; Office of Fossil Energy, U.S. Department of Energy, Natural Gas Imports and Exports; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-906, "Power Plant Report"; Form EIA-920, "Combined Heat and Power Plant Report"; Form EIA-923, "Power Plant Operations Report"; Form EIA-886, "Annual Survey of Alternative Fueled Vehicles"; State agencies; and EIA estimates based

31

Microsoft Word - figure_06_07.doc  

Gasoline and Diesel Fuel Update (EIA)

16.4 16.0 16.4 13.0 11.7 0 2 4 6 8 10 12 14 16 18 20 22 2005 2006 2007 2008 2009 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-64A, "Annual Report of the Origin of Natural Gas Liquids Production"; Office of Fossil Energy, U.S. Department of Energy, Natural Gas Imports and Exports; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-906, "Power Plant Report"; Form EIA-920, "Combined Heat and Power Plant Report"; Form EIA-923, "Power Plant Operations Report"; Form EIA-886, "Annual Survey of Alternative Fueled Vehicles"; State agencies; and EIA estimates based

32

Microsoft Word - figure_06_07.doc  

Gasoline and Diesel Fuel Update (EIA)

14.7 15.2 16.4 16.0 16.4 0 2 4 6 8 10 12 14 16 18 20 2003 2004 2005 2006 2007 Percent Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-64A, "Annual Report of the Origin of Natural Gas Liquids Production"; Office of Fossil Energy, U.S. Department of Energy, Natural Gas Imports and Exports; Form EIA-895A, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-906, "Power Plant Report"; Form EIA-920, "Combined Heat and Power Plant Report"; Form EIA-923, "Power Plant Operations Report"; Form EIA-886, "Annual Survey of Alternative Fueled Vehicle Suppliers and Users"; and EIA estimates.

33

Microsoft Word - figure_15.doc  

Gasoline and Diesel Fuel Update (EIA)

0 0 0 2 4 6 8 10 2003 2004 2005 2006 2007 Trillion Cubic Feet 0 50 100 150 200 250 Billion Cubic Meters Residential Commercial Industrial Electric Power Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-906, "Power Plant Report"; Form EIA-920, "Combined Heat and Power Plant Report"; and Form EIA-923, "Power Plant Operations Report." Figure 15. Natural Gas Delivered to Consumers in the United States, 2003-2007 Cautionary Note: Number of Residential and Commercial Consumers The Energy Information Administration (EIA) expects that there may be some double counting in the number of residential and commercial customers reported for 2003 through 2007.

34

Microsoft Word - figure_06_07.doc  

Gasoline and Diesel Fuel Update (EIA)

1 1 16.4 13.0 11.7 10.8 8.0 0 2 4 6 8 10 12 14 16 18 20 22 2007 2008 2009 2010 2011 Sources: Office of Fossil Energy, U.S. Department of Energy, "Natural Gas Imports and Exports." Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-64A, "Annual Report of the Origin of Natural Gas Liquids Production"; Office of Fossil Energy, U.S. Department of Energy, Natural Gas Imports and Exports; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-906, "Power Plant Report"; Form EIA-920, "Combined Heat and Power Plant Report"; Form EIA-

35

ARM - Website Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Administration About Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Facility Documents ARM Management...

36

EEOC FORM  

National Nuclear Security Administration (NNSA)

U.S. Department of Energy U.S. Department of Energy National Nuclear Security Administration Management Directive-715 Fiscal Year 2012 DOE NNSA February 4, 2013 i National Nuclear Security Administration U.S. Department of Energy ANNUAL EEO PROGRAM STATUS REPORT EEO PLAN TO ATTAIN THE ESSENTIAL ELEMENTS OF A MODEL EEO PROGRAM Table of Contents Page FORM 715-01 Part A Department or Agency Identifying Information......................1 FORM 715-01 Part B Total Employment....................................................................1 FORM 715-01 Part C Agency Official(s) Responsible for oversight of EEO Program(s)................................................................................................................1

37

ADMINISTRATIVE RECORDS SCHEDULE 11:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 11: ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS June 2007 Revision 1 This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance, except as indicated below. Records documenting these functions pertain to the acquisition, allocation, utilization, and release of space and include related correspondence and reports submitted to the General Services Administration (or equivalent agency with similar Government-wide responsibilities) as directed by law and regulation (41 CFR 101-17); correspondence and forms relating to the compilation of directory service listings; identification credentials and related accountable records; requests for building and equipment services;

38

Do I Have The Right Electronic Forms For My Application? NIH's electronic Research Administration (eRA) periodically implements updated versions of SF424 (R&R) grant  

E-Print Network [OSTI]

(eRA) periodically implements updated versions of SF424 (R&R) grant application forms in order to remain current with the most recent form sets available through Grants.gov and approved by the Office funding opportunity announcements (FOAs) via new application packages. Applicants use the "Apply for Grant

Baker, Chris I.

39

Administrative Technician  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Montana Maintenance, Fort Peck, Montana. Find out more...

40

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE...  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Contact Us | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

please use the form below. For general information about NNSA, please feel free to contact us: Mailing Address National Nuclear Security Administration U.S....

42

Energy Information Administration - Commercial Energy Consumption...  

Gasoline and Diesel Fuel Update (EIA)

to totals. Source: Energy Information Administration, Office of Energy Markets and End Use, Forms EIA-871A, C, and E of the 2003 Commercial Buildings Energy Consumption Survey....

43

Bonneville Power Administration Administrator Steve Wright  

E-Print Network [OSTI]

Bonneville Power Administration Administrator Steve Wright PO Box 12999 Portland, OR 97208 Dear salmon, clean, renewable energy, and a healthy economy. The Bonneville Power Administration (BPA largely failed to meet their legal salmon recovery responsibilities. I urge the Bonneville Power

44

Computer Systems Administrator  

E-Print Network [OSTI]

Computer Systems Administrator Fort Collins, CO POSITION A Computer Systems Administrator (Non activities. RESPONSIBILITIES The System Administrator will provide Unix/Linux, Windows computer system or computer science, and three years computer systems administration experience. DURATION The work is planned

45

ADMINISTRATIVE RECORDS  

Broader source: Energy.gov (indexed) [DOE]

3: 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS July 2008 Revision 2 Procurement and supply records document the acquisition of goods and non-personal services, controlling the volume of stock on hand, reporting procurement needs, and related supply matters which are part of daily procurement operations. The basic procurement files reflect a considerable range of procedure, from simple, small purchases to complicated prime contractor and subcontractor operations. Any records created prior to 1895 must first be offered to the National Archives and Records Administration (NARA) for appraisal before applying the disposal instructions. Frequently copies of procurement papers become integral parts of other files, such as project files of various types or general subject files pertaining to program operations;

46

Management and Administration | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management and Administration | National Nuclear Security Administration Management and Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Management and Administration Home > About Us > Our Programs > Powering the Nuclear Navy > Management and Administration Management and Administration NNSA's Naval Reactors is committed to excellence and dedicated to meeting

47

Steve Wright, Administrator Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TDO 541.744.3659 ww"" .;'.I-ut': October 10,2008 Steve Wright, Administrator Bonneville Power Administration P.O. Box 3621 Portland, OR 97208-3621 Re: Increase in Slice Product...

48

TWRS information locator database system administrator`s manual  

SciTech Connect (OSTI)

This document is a guide for use by the Tank Waste Remediation System (TWRS) Information Locator Database (ILD) System Administrator. The TWRS ILD System is an inventory of information used in the TWRS Systems Engineering process to represent the TWRS Technical Baseline. The inventory is maintained in the form of a relational database developed in Paradox 4.5.

Knutson, B.J., Westinghouse Hanford

1996-09-13T23:59:59.000Z

49

Forms | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forms Forms Forms DOE Forms are developed within the Department, and approved by the DOE Forms Manager. These forms are designed to obtain or provide structured information common to the needs of two or more DOE field or Headquarters organizations. All of the forms here are in Portable Document Format (PDF). Adobe Acrobat(R) Reader is needed to view and print the PDF files. Fillable forms, identified by the "fillable" icon, require a full version of Adobe Acrobat software. DOE Forms Forms by Subject Forms by Number Management & Administration 0000 - 1999 Legal 2000 - 2999 Personnel Management 3000 - 3999 Logistic Management 4000 - 4999 Program Planning & Management 5000 - 5999 HQ Forms HQ Forms are developed or managed by a Headquarters organization, and

50

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Broader source: Energy.gov (indexed) [DOE]

: PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS Payrolling and pay administration records pertain to the...

51

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Broader source: Energy.gov (indexed) [DOE]

2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 Payrolling and pay administration records...

52

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 2, 2014 Smith Named as New Deputy Assistant Administrator Smith Named as New Deputy Assistant Administrator Barbara Smith Barbara Smith, a former Liaison Specialist for...

53

U.S. Energy Information Administration  

Gasoline and Diesel Fuel Update (EIA)

Energy Information Administration Energy Information Administration Annual Report on Implementation of CIPSEA - 4/30/13 This report is for activity during calendar year 2012. 1) Use of the CIPSEA Confidentiality Pledge. The Energy Information Administration (EIA) collected information under Title V of the E-Government Act, Confidential Information Protection and Statistical Efficiency Act of 2002 (CIPSEA) from the following eleven (11) surveys during 2012. Office of Petroleum and Biofuels Statistics Petroleum Marketing Surveys OMB No: 1905-0174 Form EIA-863, "Petroleum Product Sales Identification Survey" Form EIA-878, "Motor Gasoline Price Survey" Form EIA-888, "On-Highway Diesel Fuel Price Survey"

54

DIVISION OF ADMINISTRATION  

E-Print Network [OSTI]

, Oceanic & Atmospheric HSBC Health Sciences Business Center UABC University Administrative Employee

Escher, Christine

55

Electricity Monthly Update - Energy Information Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Administration, Form EIA-923, Power Plant Operations Report Coal stockpiles at electric power plants totaled 136 million tons at the end of October, lower than in recent years for...

56

Energy Information Administration - Commercial Energy Consumption...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

sum to totals. Source: Energy Information Administration, Office of Energy Markets and End Use, Forms EIA-871A, C, and E of the 2003 Commercial Buildings Energy Consumption Survey....

57

Form Approv  

Broader source: Energy.gov (indexed) [DOE]

'JOE I' ':0 'JOE I' ':0 ) e " Flee/romc Form Approv ed by CGIR· 01120195 (8 ./1" United States Government Department of Energy Bonneville Power Administra ion memorandum DATE : uC l J !:' ZD y REPLY TO ATTN OF : KEP-4 SUBJECT: Environmental Clearance Memorandum TO ; Rob Ochs Project Manager - TELM-TPP-3 Proposed Action: Lane-Wendson No.1 Structure 10/5 Access Road Improvement and Pole Replacement Project Budget Information: Work Order # 224549 PP&A Project No.: 1117 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Sub part 0,10 C.F.R. Part) 021): B 1.3, Routine maintenance activities ... for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ... .are required to maintain

58

2014 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for 2014 The U.S. Energy Information Administration (EIA) is proposing changes to its electricity data collection in 2014. These changes involve the following surveys: Form EIA-63B, "Annual Photovoltaic Cell/Module Shipments Report," Form EIA-411, "Coordinated Bulk Power Supply Program Report," Form EIA-826, "Monthly Electric Utility Sales and Revenue Report with State Distributions," Form EIA-860, "Annual Electric Generator Report," Form EIA-860M, "Monthly Update to the Annual Electric Generator Report," Form EIA-861, "Annual Electric Power Industry Report," Form EIA-861S, "Annual Electric Power Industry Report (Short Form)," and

59

Southeastern Power Administration | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southeastern Power Administration Southeastern Power Administration Search Search form Search Southeastern Power Administration Southeastern Power Administration Services Services Home Rate Schedules Acquisition Program Competitive Resource Strategies Annual Reports SEPA FOIA Power Operations Power Operations Home How it Works Generation Quick Facts Mission About Us About Us Home News News Home Press Releases Career Opportunities SEPA History SEPA Video Offices Southeastern Power Administration Southeastern Power Administration Power Operations Click to view a map of SEPA power operations. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina

60

ADMINISTRATIVE RECORDS SCHEDULE 16:  

Broader source: Energy.gov (indexed) [DOE]

2 2 ADMINISTRATIVE RECORDS SCHEDULE 16: ADMINISTRATIVE MANAGEMENT RECORDS June 2007 Revision 1 This schedule covers those administrative management activities not covered by other Administrative Schedules. Included are disposable records created in the course of organizational planning, development, and simplification of procedures; records management activities; and administration of management improvement programs. See ADM 1 (items 12 and 13) for the disposition of case files on individuals involved in incentive award and similar types of management improvement programs. The organizational locations and titles of administrative management units vary. They may be scattered at numerous levels or locations, or may be centralized. For the purposes

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Administrative | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Employee Services » Administrative Services » Employee Services » Administrative Administrative The Office of Management provides many of the administrative services that keep the Department of Energy operational. These functions are primarily provided by the Office of Administration, MA-40, the Office of Administrative Management and Support, MA-42. Administrative Management Services Conferencing and Special Events Copier Services Document Imaging Graphics Mail and Distribution Photography Printing For a listing of office contacts please use the About Us menu, the Contact Us section, available directly through this link. We welcome your comments or questions regarding these services. Please feel free to provide feedback to the Office of Administration's Customer Mailbox at: MA-40Customervoice@hq.doe.gov.

62

ADMINISTRATIVE UNIVERSITY POLICY  

E-Print Network [OSTI]

ADMINISTRATIVE UNIVERSITY POLICY FACULTY UNIVERSITY POLICY STUDENT UNIVERSITY POLICY Issue stakeholder list "Log-In" of Proposed University Policy with the University Compliance Committee (UCC) UCC identifies which track (i.e., Administrative, Faculty, or Student) the proposed University Policy

63

Division of Administration  

E-Print Network [OSTI]

Contracts & Procurement Don Green Controller Steven Yim Budget Planning & Administration Sarah Song Admin Operations Lieutenant Scot Willey Administration Lieutenant John Brockie Division Communication Editorial Communication Editorial Board looks forward to improving communication within and from the Division and welcomes

de Lijser, Peter

64

Bonneville Power Administrator Compares  

E-Print Network [OSTI]

Bonneville Power Administrator Compares Missouri Basin Reservoirs with Pacific Northwest's by Pat-16 was the dinner speech of a former Nebraskan from Schuyler, James Jura. Now administrator of the Bonneville Power Administration, Portland, Ore., Jura has been with Bonneville for the past 10 ears. He spoke to the group

Nebraska-Lincoln, University of

65

DOE Administrative Records Schedules Changes | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Administrative Records Schedules Changes DOE Administrative Records Schedules Changes Changes posted to Administrative Records Schedules DOE Administrative Records Schedules...

66

Administrative Management Records | Department of Energy  

Office of Environmental Management (EM)

Administrative Management Records Administrative Management Records This schedule covers those administrative management activities not covered by other Administrative Schedules...

67

U.S. Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

0 0 U.S. Energy Information Administration | Natural Gas Annual Figure 3. Marketed production of natural gas in the United States and the Gulf of Mexico, 2012 (million cubic feet) None 1-15,000 15,001-100,000 100,001-200,000 200,001-500,000 500,001 and over Sources: Energy Information Administration (EIA), Form EIA-895, "Annual Quantity and Value of Natural Gas Report"; Form EIA-914, "Monthly Natural Gas Production Report"; state agencies; Form EIA-23, "Annual Survey of Domestic Oil and Gas Reserves"; LCI; Ventyx; and the Bureau of Safety and Environmental Enforcement, and predecessor agencies. IN OH TN WV VA KY

68

Energy Department Names Elliot Mainzer Bonneville Power Administration Administrator  

Broader source: Energy.gov [DOE]

The Energy Department announced that Elliot Mainzer has been appointed Administrator for the Bonneville Power Administration (BPA).

69

PASS Form 22933  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Private: The information contained on this form is considered private and for administrative use only. Do not copy or distribute. Private: The information contained on this form is considered private and for administrative use only. Do not copy or distribute. PASS Form Information Form: 22933 Title of Experiment: "Comparing Chlorpyrifos Levels in Commercial vs. Organic Parsley" Principal Investigator: Lucinda Hemmick Institution: Longwood Sr. High School Primary Field of Research: Environmental Sciences Type of Proposal: Rapid Access On-site Access: Experiment will be performed on-site, in person by the PI's experimenters. The PI (and approved experimenters) may also request remote computer access for operating equipment, data collection and retrieving data. Research Abstract of this experiment. This section will be used for funding agency reporting purposes. This information and the proposal title may become public information.:

70

Energy Efficiency Program Administration Powerpoint Presentation...  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Program Administration Powerpoint Presentation Energy Efficiency Program Administration Powerpoint Presentation Energy Efficiency Program Administration Powerpoint...

71

Southeastern Power Administration | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Southeastern Power Administration Southeastern Power Administration Southeastern Power Administration View All Maps Addthis...

72

Chemistry Department Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Administration Administration A. Harris, Chair (631) 344-4301 alexh@bnl.gov G. Hall, Deputy Chair (631) 344-4376 gehall@bnl.gov S. McAlary, Deputy BES Manager (631) 344-4305 mcalary2@bnl.gov J. Petterson, Senior Administrative Assistant (631) 344-4302 jpetter@bnl.gov Administrative Support Includes budgeting, procurement activities, foreign/domestic travel, seminars and general administrative concerns. Guest Appointments and Personnel matters should be referred to the Department's Senior Administrative Assistant. L. Sallustio (631) 344-4303 lsallust@bnl.gov Building and Stockroom Maintain the Chemistry Department stockroom and provide technical and building support to the staff. Information on the BNL Chemical Management Inventory system is available through the stockroom. Click here to view

73

National Nuclear Security Administration  

Broader source: Energy.gov (indexed) [DOE]

National Nuclear Security Administration National Nuclear Security Administration Ofice of Secure Transportation mKlK= Box RQMM= ^luquerqueI= kj= UTNUR= ;JAN 03 213 MEMORANDUM FOR GREGORY eK= WOODS GENERAL COUNSEL DEPARTMENT OF ENERGY FROM: SUBJECT: JEFFREY P. HARREL ASSIST ANT DEPU FOR SECURE 2013 ANNUAL PLANNING SUMMARY In response to your memorandum of December TI= 2012, the following information is provided for the National Nuclear Security Administration Ofice of Secure

74

EEOC FORM  

National Nuclear Security Administration (NNSA)

Opportunity Commission FEDERAL AGENCY ANNUAL EEO PROGRAM STATUS REPORT U.S. Department of Energy National Nuclear Security Administration For period covering October 1, 2011, to...

75

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

76

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 ANNUAL REPORT 7 ANNUAL REPORT Southwestern Power Administration Letter to the Secretary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 About Southwestern. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Accomplishments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Supplementary Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

77

Is Administrative Law Inevitable?  

E-Print Network [OSTI]

cautionary tone. In Vermont Yankee v. NRDC, 120 the Supremenot do, declared the Vermont Yankee Court, to look outsideof administrative discretion. Vermont Yankee, as has been

Rodriguez, Daniel; Weingast, Barry

2009-01-01T23:59:59.000Z

78

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

minimize customers switching between options to create simplicity in reporting and administration and avoid potential oversights. If circumstances change and Option 2 becomes...

79

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

o Includes option to elect into Shared Rate Plan, if room under limit Bonneville Power Administration 061708 Revision (Original version issued externally April 11, 2008)...

80

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 minimize switching back and forth between options to create simplicity in reporting and administration. If circumstances change and Option 2 becomes burdensome for a utility BPA...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

agreement (Agreement) between the BC Hydro and Power uthority (BCH) and the Bonneville Power Administration (BP A), jointly the Parties, which BA for accounting purposes is...

82

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of four Power Marketing Administrations in the United States, Southwestern markets hydroelectric power in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas from 24 U.S....

83

National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

University of California Extend Management Contracts For Defense Labs The Department of Energy (DOE), the National Nuclear Security Administration (NNSA) and the University of...

84

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

May 22, 2014 Lake Texoma Hydropower Generation to Remain Low for Near Future TULSA, OK - Southwestern Power Administration (Southwestern) announced today that in response to...

85

User Financial Account Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

URA REVISED 2/20/13 URA REVISED 2/20/13 User Financial Account Form Establish a user financial account at SLAC to procure gases, chemicals, supplies or services to support your experiment at SLAC's user facilities and to send samples, dewars, or other equipment between SLAC and your institution. To open or renew your SLAC user financial account, complete and submit this form along with a Purchase Order (PO) from your institution. The PO should be made to SLAC National Accelerator Laboratory for the amount of estimated expenditures (the suggested minimum is $1,000). Send this form with the PO (or a letter from the financial officer of your institution) to: Jackie Kerlegan (SSRL) or Theresa Wong (LCLS) User Research Administration, MS 99 User Research Administration, MS 99 SLAC National Accelerator Laboratory

86

DOE FOIA Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Administration FOIA Request Form Administration FOIA Request Form To make an Electronic FOIA (E-FOIA) request, please provide the information below. Failure to enter accurate and complete information may render your FOIA request impossible to fulfill. * Requests submitted under the Privacy Act must be signed and, therefore, cannot be submitted on this form. Name: (Required) Organization: Address: (Required) Phone: FAX: Email: Reasonably Describe Records Describe the specific record (s) you seek with sufficient detail that a knowledgeable official of the activity may locate the record with a reasonable amount of effort. Such detail should include: dates, titles, file designations, and offices to be searched. Since most DOE records are not retained permanently, the more information that you provide, the better the opportunity there is to determine if the

87

Federal Aviation Administration  

E-Print Network [OSTI]

transportation systems FAA's RDT&E Organization: Federal Laboratory for R&D of aviation systems IndependentFederal Aviation Administration Federal Aviation AdministrationNextGen: Primer, Challenges. Wilson N. Felder Director, FAA William J. Hughes Technical Center Date: 6 February 2012 #12;2Federal

88

ADMINISTRATION CONTRACT NO.  

E-Print Network [OSTI]

MANAGEMENT AND OPERATING CONTRACT FOR THE LOS ALAMOS NATIONAL LABORATORY NATIONAL NUCLEAR SECURITY ADMINISTRATION CONTRACT NO. DE-AC52-06NA25396 DECEMBER 21, 2005 1943 Today Unofficial Conformed Copy as of 1 OF ENERGY NATIONAL NUCLEAR SECURITY ADMINISTRATION NNSA SERVICE CENTER- ALBUQUERQUE M&O CONTRACT SUPPORT

89

Administrative morality in Colombia  

E-Print Network [OSTI]

for Improving Efficiency and Transparency in Public Contracting," (Bogot2002). 13 Presidencia de la Repblica, "Observatorio Anticorrupcin," http://www.anticorrupcion.gov.co/educacion/. 5...ADMINISTRATIVE MORALITY IN COLOMBIA By Copyright 2013 Angela Mara Pez Murcia Submitted to the graduate degree program in Public Affairs and Administration and the Graduate...

Paez Murcia, Angela Maria

2013-05-31T23:59:59.000Z

90

ADMINISTRATIVE RECORDS SCHEDULE 23:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES June 2007 Revision 1 This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. This schedule does not apply to any materials determined to be non-record or to materials such as calendars or work schedules claimed as personal. Office Administrative Files described under item 1 are records retained by an originating office as its record of initiation of an action, request, or response to requests for information. This item may be applied only to separate administrative files containing such records as copies of

91

Adam Sieminski Administrator Biography  

Gasoline and Diesel Fuel Update (EIA)

Adam Sieminski Adam Sieminski Administrator Biography Adam Sieminski was sworn in on June 4, 2012, as the eighth administrator of the U.S. Energy Information Administration (EIA). From March 2012 to May 2012, while awaiting confirmation as EIA administrator, Mr. Siemin- ski served as senior director for energy and environment on the staff of the National Security Council. From 2005 until March 2012, he was the chief energy economist for Deutsche Bank, working with the Bank's global research and trading units. Drawing on extensive industry, government, and academic sources, Mr. Sieminski forecasted energy market trends and wrote on a variety of topics involving energy economics, climate change, geopoli- tics, and commodity prices. From 1998 to 2005, he served as the director and energy strategist for

92

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ENT OFFS Department of Energy Bonneville Power Administration P.O. Box 3621 ' 91 FS F P Portland, Oregon 97208-3621 PUBLIC AFFAIRS April 20, 2011 In reply refer to: DK-7...

93

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- NT oc Department of Energy Bonneville Power Administration * r ' P.Q. Box 3621 Portland, Oregon 97208-3621 PUBLIC AFFAIRS September 30. 201 1 In reply refer to: DK-7 Richard...

94

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is your final response to your request for information that you made to the Bonneville Power Administration (BPA) under the Freedom of Information Act (FOIA), 5 U.S.C. 552. You...

95

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

http:www.bpa.gov PR 02 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Thursday, Jan. 23, 2014 CONTACT: Kevin Wingert, 503-230-4140971-207-8390 or 503-230-5131 BPA...

96

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is a final response to your request for information that you made to the Bonneville Power Administration (BPA) under the Freedom of Information Act (FOIA), 5 USC 552. You...

97

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contact Us U.S. Department of Energy Southwestern Power Administration Gore Maintenance Office Mailing Address: P.O. Box 728 Gore, OK 74435-0728 Delivery Address: 14165 East 143rd...

98

Administrative Policy Approval Process  

E-Print Network [OSTI]

Administrative Policy Approval Process Faculty Handbook Policy Approval Process Policy idea. Faculty Handbook Committee meets during the academic year to discuss and evaluate proposed changes to Handbook policies. Policy changes approved by the Handbook Committee are forwarded to the President

99

Gina Pearson Assistant Administrator  

Gasoline and Diesel Fuel Update (EIA)

Gina Pearson Gina Pearson Assistant Administrator for Communications Duties Gina Pearson is the Assistant Administrator (AA) for Communications, and in this capacity provides leadership and direction to conduct the U.S. Energy Information Administration's comprehensive communications program for diverse external customer groups and agency employees. The AA for Communications is responsible for Agency communications policies and standards, the www.eia.gov website, press and media rela- tions, marketing and outreach services, energy education and literacy efforts, and the Agency's employee intranet site. Biography Since 2006, Gina Pearson has played a leadership role in the U.S. Energy Information Administration's (EIA) strategy and operations for commu- nicating information and data to Federal, State and local agencies; the

100

National Nuclear Security Administration | Department of Energy  

Office of Environmental Management (EM)

National Nuclear Security Administration National Nuclear Security Administration National Nuclear Security Administration More Documents & Publications Global Threat Reduction...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Earth Forms.  

E-Print Network [OSTI]

??Earth Forms narrates and explains the Masters Project Exhibition by the same name. The sculptures included in the exhibition, Earth Forms, use a variety of (more)

Mock, Janelle Marie Tullis

2010-01-01T23:59:59.000Z

102

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Loveland Area Projects November 29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development of the 2025 PMI Proposal * 2025 PMI Proposal * 2025 PMI Comment Period & Proposal Information * Questions 3 Overview of Western Area Power Administration (Western) * One of four power marketing administrations within the Department of Energy * Mission: Market and deliver reliable, renewable, cost-based Federal hydroelectric power and related services within a 15-state region of the central and western U.S. * Vision: Provide premier power marketing and transmission services Rocky Mountain Region (RMR) is one of five regional offices 4 Rocky Mountain Region

103

SMALL BUSINESS ADMINISTRATION  

Broader source: Energy.gov (indexed) [DOE]

22 Federal Register 22 Federal Register / Vol. 76, No. 29 / Friday, February 11, 2011 / Rules and Regulations SMALL BUSINESS ADMINISTRATION 13 CFR Parts 121 and 124 RIN 3245-AF53 Small Business Size Regulations; 8(a) Business Development/Small Disadvantaged Business Status Determinations AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule makes changes to the regulations governing the section 8(a) Business Development (8(a) BD) program, the U.S. Small Business Administration's (SBA or Agency) size regulations, and the regulations affecting Small Disadvantaged Businesses (SDBs). It is the first comprehensive revision to the 8(a) BD program in more than ten years. Some of the changes involve technical issues such as changing the term ''SIC code'' to

104

National Nuclear Security Administration  

Broader source: Energy.gov (indexed) [DOE]

National Nuclear Security Administration Finding of No Significant Impact for the Construction and Operation of a New Office Building and Related Structures within TA-3 at Los Alamos National Laboratory, Los Alamos, New Mexico U. S. Department of Energy National Nuclear Security Administration Los Alamos Area Office 528 35th Street Los Alamos, N M 8 7 5 4 4 DEPARTMENT OF ENERGY. NATIONAL NUCLEAR SECUIRTY ADMINISTRATION FINDING OF NO SIGNIFICANT INIPACT Construction and Operation of a New Office Building and Related Structures withinTA-3 at Los Alarnos National Laboratory, Los Alamos. New Mexico FINAL ENVIRONMENTAL ASSESSMENT: The Environmental Assessment (EA) for Construction and Operation of a New Office Building and Related Structures within TA-3 at L os Alamos National Laboratory, Los Alamos, New Mexico (DOE/EA- 7 375)

105

Energy Information Administration  

Gasoline and Diesel Fuel Update (EIA)

Marks 25th Anniversary of 1973 Oil Embargo Marks 25th Anniversary of 1973 Oil Embargo Jay Hakes, Administrator, Energy Information Administration (EIA) September 3, 1998 Click here to start Table of Contents Energy Information Administration Some Views of 1973 Major Disruptions of World Oil Supply Imported Oil as a Percent of Total U. S. Consumption Percent of OPEC and Persian Gulf World Oil Production U. S. Retail Price of Gasoline U. S. Total Petroleum Consumption U. S. Per Capita Use of Petroleum U. S. Government Owned Crude Oil Stocks Cost of Finding Oil and Gas Reserves U. S. MPG Ratings for New Vehicles U. S. Average Horsepower of a New Vehicle Share of U. S. Electricity Generated By Petroleum Futures And Options Markets Changed Energy Marketing U. S. Total Energy Consumption U. S. Per Capita Use of Energy

106

National Nuclear Security Administration  

Broader source: Energy.gov (indexed) [DOE]

AI~W~~l AI~W~~l 11Vl'~~4 National Nuclear Security Administration Department of Energy National Nuclear Security Administration Nevada Site Office P.O. Box 98518 Las Vegas, NV 89193-8518 JAN! 8 2013 Gregory H. Woods, General Counsel, DOE/HQ (GC-1) FORS NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE (NNSA/NSO) NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) ANNUAL SUMMARY In accordance with DOE Order 451.1B, National Environmental Policy Act Compliance Program, NNSA/NSO is submitting the enclosed Annual NEP A Planning Summary. The document provides a brief description of ongoing and planned NEP A actions for calendar year 2013. This summary provides information for completion of the Site- Wide Environmental Impact Statement for the Nevada National Security Site and Off-Site Locations in the State of Nevada.

107

Federal Railroad Administration  

Broader source: Energy.gov (indexed) [DOE]

Update Du Update Du Jour Department Of Energy Transportation External Coordination Working Group Meeting Albuquerque, New Mexico April 21-23, 2004 Presented by Kevin R. Blackwell Radioactive Materials Program Manager Federal Railroad Administration Federal Railroad Administration Dedicated Train Study- Report to Congress FRA' s Research & Development Office (as lead on the study) received a draft final report from the Volpe National Transportation Systems Center (VNTSC) in late November, 2003. Editorial corrections were made and a final draft dated February, 2004 was provided to FRA. Final Draft Report FRA has been reviewed and been sent to FRA Administrator for clearance and forwarding to DOT OST. FRA has already "Officially Coordinated" and briefed DOT OST and

108

National Aeronautics and Space Administration www.nasa.gov  

E-Print Network [OSTI]

National Aeronautics and Space Administration www.nasa.gov Entry Form for 2012 NASA Langley will become the property of the National Aeronautics and Space Administration (NASA) and will not be returned. I give permission to NASA to use, reproduce, prepare derivative works, publish, distribute copies

Christian, Eric

109

Dear Secretary/ Administrator:  

Broader source: Energy.gov (indexed) [DOE]

Office of Management and Budget Dear Secretary/ Administrator: Executive Office of the President Council on Environmental Quality Consistent with the President's focus on sound stewardship of our natural resources, we are committed to improving environmental governance through constructive and timely approaches to addressing challenges that arise over the use, conservation, and restoration of the environment, natural resources, and public lands. To achieve better governance, the Administration calls for department and agency commitment to the goals identified in the Memorandum on Environmental Collaboration and Conflict Resolution, and the goals identified in related policy guidance. This approach supports other transparency and good government initiatives including the Memorandum on Transparency and Open Government (January 21,

110

Federal Railroad Administration  

Broader source: Energy.gov (indexed) [DOE]

DOE TRANSPORTATION EXTERNAL WORKING GROUP MEETING Pueblo, CO. September 20, 2005 Presented by Kevin R. Blackwell Radioactive Materials/Hazardous Materials Specialist Federal Railroad Administration - HQ Hazmat Division, Washington, DC. Federal Railroad Administration Dedicated Train Study - Report to Congress November 2003 - FRA' s Ofc. Of Research & Development (RDV), as lead on the Dedicated Train Study (DTS), received draft final report from the Volpe National Transportation Systems Center (VNTSC), the contractor conducting the study. February, 2004 - FRA completed review of DFR and submitted editorial corrections back to VNTSC. Final draft of the DTS with editorial corrections received from VNTSC in February, 2004. March to September 2004 -

111

ADMINISTRATIVE RECORDS SCHEDULE 22:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 22: ADMINISTRATIVE RECORDS SCHEDULE 22: AUDIT/INVESTIGATIVE RECORDS June 2007 Revision 1 Section I of this schedule covers records associated with investigations other than those performed by the Office of the Inspector General (OIG). Types of investigations may include: routine and significant internal program investigations, specific purpose investigations, audits, inspections, appraisals, and management reviews. Investigations may be described or referred to as audits, appraisals, surveillance, self-assessments, management assessments, or evaluations. Investigations may be conducted by DOE or by its contractors. Section II covers records created by the Department's OIG investigations. OIG investigations serve to prevent or reduce waste and fraud in Departmental programs,

112

National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

U.S. Department of Energy National Nuclear Security Administration Federal Equal Opportunity Recruitment Program Plan Certification - Fiscal Year 2011 Please type or print clearly and return this sheet with original signature to: Ms. Carmen Andujar, Manager Recruiting, Examining and Assessment Group Center for Talent and Capacity Policy Strategic Human Resources Policy Attn: FY 2011 FEORP Report U.S. Office of Personnel Management 1900 E Street, NW, Room 6547 Washington, D.C. 20415-9800 A. Name and Address of Agency National Nuclear Security Administration 1000 Independence Avenue, SW Washington, DC 20585 B. Name and Title of Designated FEORP Official (include address, if different from above,

113

National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

U.S. Department of Energy National Nuclear Security Administration Federal Equal Opportunity Recruitment Program Plan Certification - Fiscal Year 2009 Please type or print clearly and return this sheet with original signature to: Ms. Carmen Andujar, Manager Recruiting, Examining and Assessment Group Center for Talent and Capacity Policy Strategic Human Resources Policy Attn: FY 2009 FEORP Report U.S. Office of Personnel Management 1900 E Street, NW, Room 6547 Washington, D.C. 20415-9800 A. Name and Address of Agency National Nuclear Security Administration Office of Diversity and Outreach 1000 Independence Avenue, SW Washington, DC 20585 B. Name and Title of Designated FEORP Official (include address, if different from above,

114

National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

i. i. Message from the Administrator President Obama has reshaped our national security priorities making enterprise infrastructure modernization with integrated Information Technology (IT) capabilities a key strategic initiative. Our IT infrastructure must ensure that our workforce can access appropriate information in a secure, reliable, and cost-effective manner. Effective information sharing throughout the government enhances the national security of the United States (US). For the National Nuclear Security Administration (NNSA), effective information sharing helps strengthen our nuclear security mission; builds collaborative networks within NNSA as well as with the Department of Energy (DOE), Department of Defense (DoD), and other national security

115

Computer hardware fault administration  

DOE Patents [OSTI]

Computer hardware fault administration carried out in a parallel computer, where the parallel computer includes a plurality of compute nodes. The compute nodes are coupled for data communications by at least two independent data communications networks, where each data communications network includes data communications links connected to the compute nodes. Typical embodiments carry out hardware fault administration by identifying a location of a defective link in the first data communications network of the parallel computer and routing communications data around the defective link through the second data communications network of the parallel computer.

Archer, Charles J. (Rochester, MN); Megerian, Mark G. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN); Smith, Brian E. (Rochester, MN)

2010-09-14T23:59:59.000Z

116

Southwestern Power Administration One West Third Street  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy Department of Energy Southwestern Power Administration One West Third Street Tulsa, Oklahoma 74103-3502 December 2, 2008 ENVIRONMENTAL POLICY STATEMENT The Environmental Policy is the driver for implementing and improving Southwestern Power Administration's (Southwestern) Environmental Management System so that Southwestern can maintain and improve environmental performance. The policy reflects the commitment of top management to comply with applicable legal and other requirements, to prevent pollution and to continually improve. Southwestern's Environmental Policy forms the basis upon which its Environmental Objectives and Targets are established. Southwestern's senior management has committed in writing the following Environmental Policy:

117

NMMSS Reports | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Reports | National Nuclear Security Administration Reports | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog NMMSS Reports Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > NMMSS Reports NMMSS Reports U.S. Department of Energy / U.S. Nuclear Regulatory Commission

118

Action Codes Table | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Action Codes Table | National Nuclear Security Administration Action Codes Table | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Action Codes Table Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Code Tables > Action Codes Table

119

EEOC FORM  

National Nuclear Security Administration (NNSA)

09 09 National Nuclear Security Administration FY 2009 MD-715 EEO Program Status Report Table of Contents Page Parts A-C: Agency Identifying Information .........................................................................2 Part D: Subordinate Components..........................................................................................4 Part E: Executive Summary ..................................................................................................5 Part F: Certification...............................................................................................................14 Part G: Essential Elements of a Model EEO Program (A-F)................................................16 Part H: Plan to Reach Model EEO Program Status

120

Telecommunications administration standard  

SciTech Connect (OSTI)

The administration of telecommunications is critical to proper maintenance and operation. The intent is to be able to properly support telecommunications for the distribution of all information within a building/campus. This standard will provide a uniform administration scheme that is independent of applications, and will establish guidelines for owners, installers, designers and contractors. This standard will accommodate existing building wiring, new building wiring and outside plant wiring. Existing buildings may not readily adapt to all applications of this standard, but the requirement for telecommunications administration is applicable to all buildings. Administration of the telecommunications infrastructure includes documentation (labels, records, drawings, reports, and work orders) of cables, termination hardware, patching and cross-connect facilities, telecommunications rooms, and other telecommunications spaces (conduits, grounding, and cable pathways are documented by Facilities Engineering). The investment in properly documenting telecommunications is a worthwhile effort. It is necessary to adhere to these standards to ensure quality and efficiency for the operation and maintenance of the telecommunications infrastructure for Sandia National Laboratories.

Gustwiller, K.D. [GTE Customer Networks, Albuquerque, NM (United States)

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Video Center Administrator Guide  

E-Print Network [OSTI]

LifeSize® Video Center Administrator Guide March 2011 LifeSize Video Center 2200 #12;LifeSize Video Center Adminstrator Guide 2 Administering LifeSize Video Center LifeSize Video Center is a network server that stores and streams video sent by LifeSize video communications systems enabled for recording. It can also

Eisen, Michael

122

ACADEMIC, ADMINISTRATIVE & MULTIPURPOSE BUILDINGS  

E-Print Network [OSTI]

ACADEMIC, ADMINISTRATIVE & MULTIPURPOSE BUILDINGS 1 Albright Health Center (HC) 2 Applied Science S SIBIL I T Y M A P R E V I S E D M AY 2 0 0 7 L Open Parking M Student Parking N Reserved Parking O Open/VIP Parking P Student Parking Q Student Parking R Student Parking** S Open Parking T Open Parking U Student

Boyce, Richard L.

123

Administrative Records Schedule: Communication Records | Department...  

Office of Environmental Management (EM)

Administrative Records Schedule: Communication Records Administrative Records Schedule: Communication Records The principal records documenting communication function...

124

Western Area Power Administration | Open Energy Information  

Open Energy Info (EERE)

Administration Administration Jump to: navigation, search Name Western Area Power Administration Place Colorado Utility Id 27000 Utility Location Yes Ownership F NERC Location WECC, MAPP NERC MRO Yes NERC SPP Yes NERC WECC Yes ISO CA Yes RTO SPP Yes ISO MISO Yes ISO Other Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Schedule R-8 Farm and Home Residential Average Rates Commercial: $0.0278/kWh

125

Source: Energy Information Administration, Form EIA-782A, "Refiners...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

S O N D 0 10 20 30 40 50 60 70 1995 Cents per Gallon Excluding Taxes Retail < or 1% Wholesale < or 1% Retail > 1% Wholesale > 1% 7. U.S. Refiner Residual Fuel Oil Prices and...

126

Source: Energy Information Administration, Form EIA-782A, "Refiners...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Gallons per Day Motor Gasoline No. 2 Distillate Residual Fuel Oil 5. U.S. Refiner Wholesale Petroleum Product Volumes Figure Percentages of Refiner Wholesale Volumes 1997...

127

Source: Energy Information Administration, Form EIA-782A, "Refiners...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

4. U.S. Refiner Wholesale Petroleum Product Prices Figure J F M A M J J A S O N D 0 20 40 60 80 100 120 1996 Cents per Gallon Excluding Taxes Kero-jet Propane No. 1 Distillate No....

128

Source: Energy Information Administration, Form EIA-782A, "Refiners...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Gallons per Day Motor Gasoline No. 2 Distillate Residual Fuel Oil 5. U.S. Refiner Wholesale Petroleum Product Volumes Figure Percentages of Refiner Wholesale Volumes 1996...

129

Source: Energy Information Administration, Form EIA-782A, "Refiners...  

Gasoline and Diesel Fuel Update (EIA)

4. U.S. Refiner Wholesale Petroleum Product Prices Figure J F M A M J J A S O N D 0 20 40 60 80 100 120 1997 Cents per Gallon Excluding Taxes Kero-jet Propane No. 1 Distillate No....

130

Source: Energy Information Administration, Form EIA-782A, "Refiners...  

Gasoline and Diesel Fuel Update (EIA)

4. U.S. Refiner Wholesale Petroleum Product Prices Figure J F M A M J J A S O N D 0 20 40 60 80 100 120 1995 Cents per Gallon Excluding Taxes Kero-jet Propane No. 1 Distillate No....

131

Source: Energy Information Administration, Form EIA-782A, "Refiners...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Gallons per Day Motor Gasoline No. 2 Distillate Residual Fuel Oil 5. U.S. Refiner Wholesale Petroleum Product Volumes Figure Percentages of Refiner Wholesale Volumes 1995...

132

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Utah" "Item","Value","Rank" "Primary Energy Source","Coal" "Net Summer Capacity (megawatts)",7631,39 "Electric Utilities",6637,32 "IPP & CHP",993,44 "Net Generation...

133

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Tennessee" "Item","Value","Rank" "Primary Energy Source","Coal" "Net Summer Capacity (megawatts)",21322,20 "Electric Utilities",20635,13 "IPP & CHP",687,47 "Net Generation...

134

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Wyoming" "Item","Value","Rank" "Primary Energy Source","Coal" "Net Summer Capacity (megawatts)",8380,36 "Electric Utilities",7278,31 "IPP & CHP",1102,43 "Net Generation...

135

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

West Virginia" "Item","Value","Rank" "Primary Energy Source","Coal" "Net Summer Capacity (megawatts)",16285,25 "Electric Utilities",10590,27 "IPP & CHP",5695,18 "Net Generation...

136

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Pennsylvania" "Item","Value","Rank" "Primary Energy Source","Coal" "Net Summer Capacity (megawatts)",45406,4 "Electric Utilities",455,44 "IPP & CHP",44951,2 "Net Generation...

137

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Idaho" "Item","Value","Rank" "Primary Energy Source","Hydroelectric" "Net Summer Capacity (megawatts)",4911,42 "..Electric Utilities",3394,37 "..IPP & CHP",1517,39 "Net Generation...

138

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Washington" "Item","Value","Rank" "Primary Energy Source","Hydroelectric" "Net Summer Capacity (megawatts)",30910,10 "Electric Utilities",27037,6 "IPP & CHP",3873,24 "Net...

139

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Oregon" "Item","Value","Rank" "Primary Energy Source","Hydroelectric" "Net Summer Capacity (megawatts)",15544,27 "Electric Utilities",10888,25 "IPP & CHP",4656,19 "Net Generation...

140

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Dakota" "Item","Value","Rank" "Primary Energy Source","Hydroelectric" "Net Summer Capacity (megawatts)",4057,45 "Electric Utilities",3428,36 "IPP & CHP",629,48 "Net Generation...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Illinois" "Item","Value","Rank" "Primary Energy Source","Nuclear" "Net Summer Capacity (megawatts)",45146,5 "..Electric Utilities",5274,34 "..IPP & CHP",39872,4 "Net Generation...

142

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Hampshire" "Item","Value","Rank" "Primary Energy Source","Nuclear" "Net Summer Capacity (megawatts)",4323,44 "Electric Utilities",1121,41 "IPP & CHP",3202,31 "Net Generation...

143

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Vermont" "Item","Value","Rank" "Primary Energy Source","Nuclear" "Net Summer Capacity (megawatts)",1235,50 "Electric Utilities",329,45 "IPP & CHP",906,46 "Net Generation...

144

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Virginia" "Item","Value","Rank" "Primary Energy Source","Nuclear" "Net Summer Capacity (megawatts)",24849,16 "Electric Utilities",20626,14 "IPP & CHP",4223,23 "Net Generation...

145

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Carolina" "Item","Value","Rank" "Primary Energy Source","Nuclear" "Net Summer Capacity (megawatts)",23083,18 "Electric Utilities",21280,10 "IPP & CHP",1803,37 "Net Generation...

146

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Connecticut" "Item","Value","Rank" "Primary Energy Source","Nuclear" "Net Summer Capacity (megawatts)",9060,35 "Electric Utilities",152,46 "IPP & CHP",8909,12 "Net Generation...

147

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

Jersey" "Item","Value","Rank" "Primary Energy Source","Nuclear" "Net Summer Capacity (megawatts)",18924,22 "Electric Utilities",517,43 "IPP & CHP",18407,6 "Net Generation...

148

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",36386135,29 "IPP & CHP",3016826,45 "Emissions",, "Sulfur Dioxide (short tons)",22075,32 "Nitrogen Oxide (short tons)",54205,17 "Carbon Dioxide...

149

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",622570,43 "IPP & CHP",5947100,36 "Emissions",, "Sulfur Dioxide (short tons)",52,49 "Nitrogen Oxide (short tons)",673,50 "Carbon Dioxide (thousand...

150

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",106615302,4 "IPP & CHP",10220172,31 "Emissions",, "Sulfur Dioxide (short tons)",22136,31 "Nitrogen Oxide (short tons)",13114,41 "Carbon Dioxide...

151

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",36817,45 "IPP & CHP",36080727,11 "Emissions",, "Sulfur Dioxide (short tons)",7998,41 "Nitrogen Oxide (short tons)",12954,42 "Carbon Dioxide...

152

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",41532785,26 "IPP & CHP",11023916,29 "Emissions",, "Sulfur Dioxide (short tons)",42846,27 "Nitrogen Oxide (short tons)",49591,22 "Carbon Dioxide...

153

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"..Electric Utilities",8955,48 "..IPP & CHP",37800788,10 "Emissions",, "..Sulfur Dioxide (short tons)",44601,26 "..Nitrogen Oxide (short tons)",23976,34 "..Carbon Dioxide...

154

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",44603847,22 "IPP & CHP",20401831,19 "Emissions",, "Sulfur Dioxide (short tons)",92438,16 "Nitrogen Oxide (short tons)",42160,26 "Carbon Dioxide...

155

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",75183893,14 "IPP & CHP",54561838,7 "Emissions",, "Sulfur Dioxide (short tons)",391088,1 "Nitrogen Oxide (short tons)",100300,4 "Carbon Dioxide...

156

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",56188401,17 "IPP & CHP",14550834,24 "Emissions",, "Sulfur Dioxide (short tons)",61385,23 "Nitrogen Oxide (short tons)",39433,28 "Carbon Dioxide...

157

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electric Utilities",92821769,8 "IPP & CHP",3933913,43 "Emissions",, "Sulfur Dioxide (short tons)",71280,21 "Nitrogen Oxide (short tons)",24538,33 "Carbon Dioxide...

158

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

egawatthours)",108166078,14 "..Electric Utilities",80483027,13 "..IPP & CHP",27683051,13 "Emissions",, "..Sulfur Dioxide (short tons)",236974,5 "..Nitrogen Oxide (short...

159

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",89949689,18 "..Electric Utilities",89155630,10 "..IPP & CHP",794059,49 "Emissions",, "..Sulfur Dioxide (short tons)",188502,7 "..Nitrogen Oxide (short...

160

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",34217293,40 "..Electric Utilities",32782885,31 "..IPP & CHP",1434407,48 "Emissions",, "..Sulfur Dioxide (short tons)",63695,22 "..Nitrogen Oxide (short...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",10469269,46 "Electric Utilities",6012748,40 "IPP & CHP",4456521,40 "Emissions",, "Sulfur Dioxide (short tons)",16073,37 "Nitrogen Oxide (short tons)",20861,35...

162

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",37809744,34 "..Electric Utilities",8955,48 "..IPP & CHP",37800788,10 "Emissions",, "..Sulfur Dioxide (short tons)",44601,26 "..Nitrogen Oxide (short...

163

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

megawatthours)",116681763,11 "..Electric Utilities",107715547,3 "..IPP & CHP",8966216,33 "Emissions",, "..Sulfur Dioxide (short tons)",81095,20 "..Nitrogen Oxide (short...

164

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",36125159,37 "..Electric Utilities",31983457,32 "..IPP & CHP",4141702,42 "Emissions",, "..Sulfur Dioxide (short tons)",87193,18 "..Nitrogen Oxide (short...

165

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",44424691,32 "..Electric Utilities",39949146,28 "..IPP & CHP",4475545,39 "Emissions",, "..Sulfur Dioxide (short tons)",32947,30 "..Nitrogen Oxide (short...

166

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",110904994,13 "Electric Utilities",92799750,9 "IPP & CHP",18105244,21 "Emissions",, "Sulfur Dioxide (short tons)",21408,33 "Nitrogen Oxide (short tons)",50391,21...

167

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",129745731,8 "Electric Utilities",75183893,14 "IPP & CHP",54561838,7 "Emissions",, "Sulfur Dioxide (short tons)",391088,1 "Nitrogen Oxide (short tons)",100300,4...

168

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",52193624,30 "..Electric Utilities",42338049,24 "..IPP & CHP",9855576,32 "Emissions",, "..Sulfur Dioxide (short tons)",36629,28 "..Nitrogen Oxide (short...

169

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",91804321,17 "..Electric Utilities",88747138,11 "..IPP & CHP",3057183,44 "Emissions",, "..Sulfur Dioxide (short tons)",149797,10 "..Nitrogen Oxide (short...

170

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

megawatthours)",114695729,12 "..Electric Utilities",99680685,6 "..IPP & CHP",15015044,23 "Emissions",, "..Sulfur Dioxide (short tons)",286156,3 "..Nitrogen Oxide (short...

171

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",27804784,41 "..Electric Utilities",8486142,38 "..IPP & CHP",19318641,20 "Emissions",, "..Sulfur Dioxide (short tons)",16510,35 "..Nitrogen Oxide (short...

172

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",56675404,27 "Electric Utilities",43385936,23 "IPP & CHP",13289468,27 "Emissions",, "Sulfur Dioxide (short tons)",105699,14 "Nitrogen Oxide (short...

173

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",65005678,24 "Electric Utilities",44603847,22 "IPP & CHP",20401831,19 "Emissions",, "Sulfur Dioxide (short tons)",92438,16 "Nitrogen Oxide (short tons)",42160,26...

174

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",52556701,29 "Electric Utilities",41532785,26 "IPP & CHP",11023916,29 "Emissions",, "Sulfur Dioxide (short tons)",42846,27 "Nitrogen Oxide (short tons)",49591,22...

175

"Sources: U.S. Energy Information Administration, Form EIA-860...  

U.S. Energy Information Administration (EIA) Indexed Site

(megawatthours)",36635909,35 "Electric Utilities",30704865,33 "IPP & CHP",5931044,37 "Emissions",, "Sulfur Dioxide (short tons)",16560,34 "Nitrogen Oxide (short tons)",61130,13...

176

FORM EIA-846C  

U.S. Energy Information Administration (EIA) Indexed Site

No. 1905-0169: Approval Expires 04/30/91 No. 1905-0169: Approval Expires 04/30/91 FORM EIA-846C (5-1 89) U.S. DEPARTMENT Of COMMERCE BUREAU OF THE CENSUS ACTING AS COLLECTING AND COMPILING AGENT FOR UNITED STATES DEPARTMENT OF ENERGY ENERGY INFORMATION ADMINISTRATION Public reporting burden for this collection of information is estimated to average 8 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Energy Information Administration, Office of Statistical Standards, El-73, Mail Station: 1H-023 Forrestal, 1000 Independence Avenue, SW, Washington, DC 20485; and to the Office of Information and

177

Research Input Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HighlightsSubmit HighlightsSubmit Form Submit a New Research Highlight Sort Highlights Submitter Title Research Area Working Group Submission Date DOE Progress Reports Notable Research Findings for 2001-2006 Biological and Environmental Research Abstracts Database Research Highlights Summaries Research Highlight Submittal Form Tell us about your research! This form is designed to collect summary information about working group research results. If you have any questions or comments, please contact the administrators. Journal or Book Reference(s) (if applicable): Look Up Your reference from the Publications Database. Limit two references. If you have not submitted the references, please Add it now. Area of Research: Radiation Processes Cloud Distributions/Characterizations Surface Properties General Circulation and Single Column

178

Form Approved  

U.S. Energy Information Administration (EIA) Indexed Site

Approved Approved OMB No. 1905-0092. El A 457B (Expires May 31, 1990.) This survey is voluntary and authorized under the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. Information about specific households will be kept strictly confidential. The data will be summarized within large groupings for statistical purposes. 1987 Residential Energy Consumption Survey Energy Information Administration U.S. Department of Energy Location # Housing Unit # 111-116 117-118 EIA 457B * 1987 Residential Energy Consumption Survey TIME INTERVIEW STARTED 1. In what year did your family this (house/apartment)? AM PM move into 01 [ ] Before 1940 02 [ ] 1940-1949 03 [ ] 1950-1959

179

Form Approved  

U.S. Energy Information Administration (EIA) Indexed Site

Approved Approved OMB No. 1905-0092 . EIA 4578 (Expire* August 31,1986} Th|« turvey Is voluntary and authorized under (he Federal Energy Administration Act of 1974 (Public La* 93-275) a* amended. Information about *p*clflc houiehold* will t>* kept strictly confidential. The d*la will be summarized within large grouping! for tatlttlcal purposes. Residential Energy Consumption Survey Fall-Winter* 1984-1985 Energy Information Administration U.S. Department of Energy Location ff. Housing UnN *.. 111-116 117-118 TIME INTERVIEW STARTED 1. In what year did your family this (house/apartment)? AM PM move into 01 [] BEFORE 1940 02 [] 1940-1949 03 [] 1950-1959 04 [] 1960-1964 05 [] 1965-1969 06 [] 1970-1974 07 [] 1975-1976 08 [] 1977-1979 09 [] 1980 10 [] 1981 121 11 [] 1982 122

180

Me Stephen J. Wright Administrator Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6, 200R Me Stephen J. Wright Administrator Bonneville Power Administration P.O. Box 3621 Portland. Oregon 97208-362 Re: Slice Product Subscription Dear Steve: As public agency...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

National Nuclear Security Administration National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog US, UK, France Discuss Stockpile Stewardship, Arms Control and Nonproliferation and Visit the Nevada National Security Site Learn More NNSA DOE removes all remaining HEU from Hungary Learn More DOE removes all remaining HEU from Hungary Tiffany A. Blanchard-Case receives 2013 Linton Brooks Medal

182

SOUTHWESTERN POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

01 01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix, A or B to Subpart D. (2) There are no extraordinary circumstances related to the proposal that may affect the Significance of the environmental effects of the proposal; and (3) The proposal is not "connected" to other actions with potentially significant impacts, is not related to

183

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News & Publications News & Publications Annual Performance Plan Annual Report Newsletters Strategic Plan SWPA - Overview Video System Map Press Releases 2012 Skip Navigation Links Turner Named Southwestern Administrator 2009 Skip Navigation Links New Deputy Administrator Selected for Liaison Office Ice Storm Damage Update - March 24, 2009 Ice Storm Damage Update - March 12, 2009 Ice Storm Damage Update - March 10, 2009 Ice Storm Damage Update - March 05, 2009 Ice Storm Damage Update - March 04, 2009 Ice Storm Damage Update - March 02, 2009 Ice Storm Damage Update - February 23, 2009 Ice Storm Damage Update - February 17, 2009 Ice Storm Damage Update - February 13, 2009 Ice Storm Damage Update - February 12, 2009 Ice Storm Damage Update - February 11, 2009 Ice Storm Damage Update - February 10, 2009

184

National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wnchington, DC 20585 Wnchington, DC 20585 July 13, 2010 OFFICE O F THE ADMINISTRATOR 'l'he Honorable Peter S. Winokur Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, D.C. 20004 [>ear Mr. Chairman: By the direction of the Secretary of Energy, the enclosed is the Department's Implementation Plan (Plan) for Defense Nuclear Facilities Safety Board (Board) Recommendation 2009-2, Los Alamos Nutional Luhorutory Plutoniu?lt Fucilitj. Sr i s m ic Sufety. The Plan provides the Department's approach for implementing near-term actions to reduce the consequences of seismically-induced events at the Los Alamos National Laboratory Plutonium Facility, and longer-tcrm actions to ensure continued safe operation of the facility. Mr. James .I. McConnell. Assistant Deputy Administrator for Nuclear Safety and

185

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News Items News Items Skip Navigation Links December 7, 2012 Southwestern Helps Restore Power After Hurricane Sandy September 27, 2012 New Administrator April 27, 2012 Table Rock Visitor Center April 24, 2012 WFEC Earth Day Publications Skip Navigation Links Annual Performance Plan Annual Report Newsletters Press Releases Strategic Plan SWPA - Overview Video System Map December 7, 2012 Southwestern Helps Restore Power After Hurricane Sandy Southwestern Aids Sandy Recovery Line crews from Southwestern repair distribution lines in Tom's River, New Jersey, following Hurricane Sandy. In the aftermath of Hurricane Sandy in early November 2012, Southwestern Power Administration sent several line, substation, and right-of-way brush crews and 30 pieces of heavy equipment to help restore the electrical grid

186

SOUTHWESTERN POWER ADMINISTRATION  

Broader source: Energy.gov (indexed) [DOE]

9/01 9/01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix, A or B to Subpart D. (2) There are no extraordinary circumstances related to the proposal that may affect the Significance of the environmental effects of the proposal; and (3) The proposal is not "connected" to other actions with potentially significant impacts, is not related to

187

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Skip Navigation Links Skip Navigation Links Annual Performance Plan Annual Report Mission Organization Strategic Plan SWPA - Overview Video System Map About the Agency Southwestern Power Administration was established in 1943 by the Secretary of the Interior as a Federal Agency that today operates within the Department of Energy under the authority of Section 5 of the Flood Control Act of 1944. As one of four Power Marketing Administrations in the United States, Southwestern markets hydroelectric power in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas from 24 U.S. Army Corps of Engineers multipurpose dams. By law, Southwestern's power is marketed and delivered primarily to public bodies such as rural electric cooperatives and municipal utilities. Southwestern has over one hundred such "preference" customers, and these

188

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Occupational Occupational Safety & Health Administration Safety The safety and well-being of all Southwestern Power Administration employees are the firm and continuing responsibilities of every member of management. Each employee, in turn, shares with management the responsibility for his or her own safety by performing his or her duties in a safe and conscientious manner, complying with all safety rules and regulations, and observing the provisions of Executive Order 12196, "Occupational Safety and Health Programs for Federal Employees." Southwestern's Recordable Accident Frequency Rate (RAFR) for Calendar Year 2011 (Jan - Dec 2011) was 1.28, and for Fiscal Year 2011 (Oct 2010 - Sep 2011) the RAFR was 0.64. Additionally, 2011 marked the nineteenth consecutive

189

ADMINISTRATIVE RECORDS SCHEDULE 21:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS June 2007 Revision 1 This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. For audiovisual records that are not described in this schedule, an SF 115, Request for Records Disposition Authority, must be submitted to the National Archives and Records Administration (NARA). Audiovisual records include still and motion picture photography, graphic materials, and sound and video recordings. Related documentation includes (1) production files or other files documenting the creation, justification, ownership, and rights to the records and (2) finding aids used to identify or access the records. This schedule does not cover: (1) cartographic records, (2) remote sensing imagery

190

Bonneville Power Administration (BPA)  

Broader source: Energy.gov (indexed) [DOE]

Staff version which still requires senior executive review Staff version which still requires senior executive review Office of Office of Human Capita Human Capital Management Management Bonneville Power Administration Risk Informed Human Capital - Workforce Plan 2007-2009 September 15, 2006 2007 BPA Risk Informed Human Capital - Workforce Plan Table of Contents INTRODUCTION............................................................................................................. 5 Impact of the 2006 Workforce Plan ..............................................................................................6 BPA Strategic Objectives as drivers of the WP .......................................................................... 6 I. CONTEXT ................................................................................................................... 6

191

Ms. Rebecca Peterson Energy Information Administration  

Gasoline and Diesel Fuel Update (EIA)

Ms. Rebecca Peterson Ms. Rebecca Peterson Energy Information Administration Submitted by email: ERS2014@eia.gov Dear Ms. Peterson: This is to comment on the Energy Information Administration's (EIA) solicitation of comments on the proposed three-year reauthorization of forms EIA-63B, EIA-411, EIA-826, EIA-860, EIA-860M, EIA-861, EIA-861S, and EIA-923, and the creation of form EIA-930. These comments are in response to the notice published in Vol. 78, No. 44 of the Federal Register on March 6, 2013. Omaha Public Power District (OPPD) is a customer-owned electric utility and political subdivision of the state of Nebraska. OPPD is currently a balancing authority and owns a transmission system and

192

PP-36 Bonneville Power Administration  

Broader source: Energy.gov [DOE]

Presidential Permit authorizing Bonneville Power Administration to construct, operate, and maintain electric transmission facilities from U.S.- Canada Border.

193

FORM EIA-846(F)  

U.S. Energy Information Administration (EIA) Indexed Site

No. 1905-0169: Approval Expires March 31,1989 No. 1905-0169: Approval Expires March 31,1989 FORM EIA-846(F) (6-S-86) U.S. DEPARTMENT OF COMMERCE .(djSS^X BUREAU OF THE CENSUS ^p^TlJ^v ACTING AS COLLECTING AND COMPILING AGENT FOR / NOTICE - Response to this inquiry is required by lew (Federal Energy Administration Act of 1 974, as amended, P.L. 93-275). By Section 9 of Title 1 3, U.S. Code, your report to the Census Bureau is

194

Document Control Template-Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Equipment Check-Out Form 08_0411 Page 1 of 3 7 Equipment Check-Out Form 08_0411 Page 1 of 3 EOTA - Business Form Document Title: Equipment Check-Out Form Document Number: MGTF-007 Rev. 08_0411 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: MGTP-003, Control of Customer Property Notify of Changes: MGT, ADM Referenced Document(s): N/A MGTF-007 Equipment Check-Out Form 08_0411 Page 2 of 3 Revision History: Rev. Description of Change A Initial Release 08_0411 Footer removed as document is for internal use only MGTF-007 Equipment Check-Out Form 08_0411 NATIONAL NUCLEAR SECURITY ADMINISTRATION Emergency Operations Training Academy EQUIPMENT CHECK-OUT FORM Name: Date taken:

195

Document Control Template-Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Key Check-Out Form 10_0823 Page 1 of 3 2 Key Check-Out Form 10_0823 Page 1 of 3 EOTA - Business Form Document Title: Key Check-Out Form Document Number: MGTF-012 Rev. 10_0823 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: MGTP-003, Control of Customer Property Notify of Changes: MGT, ADM Referenced Document(s): N/A MGTF-012 Key Check-Out Form 10_0823 Page 2 of 3 Revision History: Rev. Description of Change 10_0823 Initial Release MGTF-012 Key Check-Out Form 10_0823 NATIONAL NUCLEAR SECURITY ADMINISTRATION Emergency Operations Training Academy Key Check-Out Form Name: Initial Suite Key: Date returned: Furniture Key: Date returned: Building Key: Date returned: Other Key(s): Date returned:

196

ADMINISTRATIVE RECORDS SCHEDULE 20:  

Broader source: Energy.gov (indexed) [DOE]

20: 20: ELECTRONIC RECORDS April 2008 Revision 2 This schedule authorizes the disposition of specified electronic records and hard-copy or microform records and are integrally related to them. The electronic records may either be created or received. Included are records created by computer operators, programmers, analysts, systems administrators, and all personnel with access to a computer. Disposition authority is provided for certain master files, including some tables that are components of data base management systems, and certain files created from master files for specific purposes. In addition, this schedule covers certain disposable electronic records produced by end users in office automation applications. These disposition authorities apply to the

197

Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

2008 Electricity Forms Clearance Differences in Current Forms Compared to Those Published in the April 4, 2007 Federal Register Notice. Form EIA-411 No changes. Form EIA-826 Schedule 1, "Sales to Ultimate Consumers," has been changed to ask for the megawatthours sold and delivered and the revenue for the residential, commercial, industrial, and transportation sectors are now requested to be reported to the nearest dollar, rather than the nearest 10 dollars. Form EIA-860 The effective date of the reported data has been changed from January 1 to December 31. The following questions have been modified: Schedule 2. "Power Plant Data" has added: * Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying

198

order form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Customer Order Form Customer Order Form Fermilab Education Office - Customer Order Form PO BOX 500, MS 777, Batavia, IL 60510 * ph. 630-840-8258 * fax 630-840-2500 * avarry@fnal.gov Date: This order be: SHIPPED PICKED UP? Bill to: Ship to: Contact/Institution name: Email: Phone: Fax: Payment method (please circle): Visa/MasterCard - Check - Purchase Order  Visa/MasterCard # P.O. # Exp Date: Quantity Ordered Item Name Item Description (color, size, etc.) Price Each Total Amount  For purchases over $200 only *IL residents ONLY: Add 7.5% sales tax to your order.

199

U.S. Energy Information Administration (EIA)  

Gasoline and Diesel Fuel Update (EIA)

Survey Forms Survey Forms Changes to Petroleum Supply Survey Forms for 2013 Released: November 27, 2012 Federal Register Notice The U.S. Energy Information Administration is requesting comments on the following proposed 2013 Petroleum Supply survey forms: EIA-800, Weekly Refinery and Fractionator Report EIA-801, Weekly Bulk Terminal Report EIA-802, Weekly Product Pipeline Report EIA-803, Weekly Crude Oil Report EIA-804, Weekly Imports Report EIA-805, Weekly Bulk Terminal and Blender Report EIA-809, Weekly Oxygenate Report EIA-22M, Monthly Biodiesel Production Report EIA-810, Monthly Refinery Report EIA-812, Monthly Product Pipeline Report EIA-813, Monthly Crude Oil Report EIA-814, Monthly Imports Report EIA-815, Monthly Bulk Terminal and Blender Report EIA-816, Monthly Natural Gas Plant Liquids Report

200

Form Approved  

U.S. Energy Information Administration (EIA) Indexed Site

DISCLOSURE OF INFORMATION: The items RESPONDENT IDENTIFICATION Company Name and OTHER PARTY NAME (Item 1.A.), and SELLER'S NAME (Item 3.B.) on Form EIA-858 are DISCLOSURE OF INFORMATION: The items RESPONDENT IDENTIFICATION Company Name and OTHER PARTY NAME (Item 1.A.), and SELLER'S NAME (Item 3.B.) on Form EIA-858 are NOT considered confidential and may be publicly released in identifiable form. All other information you provide will be used for statistical purposes only. In accordance with the Confidential Information Protection provisions of Title V, Subtitle A of Public Law 107-347 and other applicable Federal laws, your responses will be kept confidential and will not be disclosed in identifiable form to anyone other than employees or agents without your consent. By law, every EIA employee, as well as every agent, is subject to a jail term, a fine of up to $250,000, or both if he or she discloses ANY identifiable information about you.

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disability Employment Disability Employment Duty Locations Equal Employment New Employee Orientation Reasonable Accommodation Student Employment Opportunities Pathways Skip Navigation Links USAJOBS Veteran Employment Opportunities Feds Hire Vets Current Vacancy Announcements There are currently no employment vacancies. Please check here regularly for career opportunities at Southwestern Power Administration. Apply At USAJOBS USAJobs is the official job site of the US Federal Government. Please visit this site to see all job vacancies within Southwestern, the Department of Energy, and the Federal Government. Please pay close attention to the closing date in the "Open Period" section as well as the information in the "Who May Be Considered" section on the first page of each announcement to determine if you are

202

and Acting NOAA Administrator  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

30 30 th 9:00-9:30 Welcome * Dr. Kathryn Sullivan, Acting Under Secretary of Commerce for Oceans and Atmosphere and Acting NOAA Administrator 9:30-10:30 What does Open Data Look Like? This session will provide some case studies of the use of open data to illustrate some of the issues associated with presentation of the data in a way which optimises its usefulness for end-users. It will consider different types of data, guiding principles, and different uses of data, including both research data and national agricultural data-sets. Moderator: * Tim Benton, Champion, UK Global Food Security Programme, UK Speakers: * Johannes Keizer, Team Leader, FAO United Nations, Italy * Dr. Sander Janssen, Wageningen, Netherlands * Dr. Rajeev Varshney, Director, Center of Excellence in Genomics (CEG), ICRISAT, Hyderabad,

203

Security Administration Production Office,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

JUNE/JULY 2013 JUNE/JULY 2013 inside this issue ... Reaching the summit - Big hitters talk economic development Page 3 Saving yesterday's knowledge today Page 5 What's a fellow to do? Page 6 ... and other Y-12 news On June 3 newly appointed Secretary of Energy Ernest Moniz (right) made Oak Ridge the site of his first official visit since being sworn in as head of the U.S. Department of Energy. Secretary Moniz met earlier in the day with national lab directors at Oak Ridge National Laboratory, then came to Y-12 for tours and a meeting with the National Nuclear Security Administration Production Office, B&W Y-12 and ORNL employees. He was joined by Rep. Chuck Fleischmann. The Secretary described Oak Ridge as a place where DOE's chief missions of nuclear security, environmental

204

Federal Railroad Administration  

Broader source: Energy.gov (indexed) [DOE]

Transportation Transportation Federal Railroad Administration Overview of Proposed Rail Safety & Security Rulemakings Kevin R. Blackwell FRA Hazmat Division Washington, DC Federal Authority DOT Authority to regulate safety and security of hazardous materials transportation Hazardous Materials Transportation Law (49 U.S.C. 5101 et.seq.) Federal Railroad Safety Act (49 U.S.C. 20101 et.seq.) TSA Authority to regulate security of hazardous material transportation Aviation Transportation Security Act (Pub. L. 107-71, 115 Stat. 597) Routing as a Part of the Transportation Cycle Routing decisions are continually made as a part of the transportation cycle for a variety of reasons. E c o n o m i c s Security S a f e t y Routing Decision Pyramid DOT NPRM HM-232E NPRM published on December 21, 2006.

205

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Student Employment Opportunities Student Employment Opportunities There are currently no student employment vacancies. Please check here regularly for career opportunities at Southwestern Power Administration. Learn more about the type of work engineers perform at Southwestern: Electric Power Marketing Engineering and Planning Reliability Compliance and Transmission Policy Resources and Rates Apply At USAJOBS USAJobs is the official job site of the US Federal Government. Please visit this site to see all job vacancies within Southwestern, the Department of Energy, and the Federal Government. Please pay close attention to the closing date in the "Open Period" section as well as the information in the "Who May Be Considered" section on the first page of each announcement to determine if you are

206

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About this site About this site This Web site is the official Web site of the Southwestern Power Administration. It is part of a Federal computer system used to accomplish Federal functions and is monitored for security purposes to ensure it remains available to all users and to protect information in the system. By accessing this Web site, you are expressly consenting to these monitoring activities. Accessibility Southwestern is committed to providing the most up-to-date, relevant information to its stakeholders and to members of the general public, including those with disabilities and/or limited English proficiency. If you are unable to access information about Southwestern due to the presentation of information in this Web site, or if you have any questions, concerns, or comments you would like to share with us, please contact

207

NATIONAL NUCLEAR SECURITY ADMINISTRATION  

National Nuclear Security Administration (NNSA)

NNSA Policy Letter: NAP-5 NNSA Policy Letter: NAP-5 (DOE P 450.3) Date: October 16, 2002 TITLE: Policy Letter for Standards Management I. OBJECTIVE: Establish NNSA expectations for Standards Management Programs used to select and maintain applicable standards for work performed at NNSA Headquarters and field sites. II. APPLICABILITY: NNSA federal staff and NNSA management and operating contractors, and other prime contractors as determined by NNSA Headquarters and/or field site management, shall use a defined formal process to tailor environment, safety, and health; project management; safeguards and security; quality assurance; business; and administrative standards and, as determined by NNSA management, other standards used to perform federal and contractor work. Here, the term standard encompasses federal,

208

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Western Area Power Administration Customer Meeting The meeting will begin at 12:30 pm MST We have logged on early for connectivity purposes Please stand-by until the meeting begins Please be sure to call into the conference bridge at: 888-989-6414 Conf. Code 60223 If you have connectivity issues, please contact: 866-900-1011 1 Introduction  Welcome  Introductions  Purpose of Meeting ◦ Status of the SLCA/IP Rate ◦ SLCA/IP Marketing Plan ◦ Credit Worthiness Policy ◦ LTEMP EIS update ◦ Access to Capital  Handout Materials http://www.wapa.gov/crsp/ratescrsp/default.htm 2 SLCA/IP Rate 3 1. Status of Repayment 2. Current SLCA/IP Firm Power Rate (SLIP-F9) 3. Revenue Requirements Comparison Table 4.SLCA/IP Rate 5. Next Steps

209

ADMINISTRATIVE RECORDS SCHEDULE 14:  

Broader source: Energy.gov (indexed) [DOE]

5 5 ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS June 2007 Revision 1 This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs. Except as otherwise specified in individual items, it applies to copies of these records wherever located. Item 4 applies only to files maintained in office responsible for the operation of the information activities. Items 11 through 15 describe the files accumulated in carrying out the provisions of the FOIA, and items 21 through 26 describe the files created in administering the provisions of the Privacy Act. Items 31

210

Energy Information Administration  

Broader source: Energy.gov (indexed) [DOE]

Internal PMA Scorecard for Human Capital Management (HCM) - FY 2006, Quarter 4 Internal PMA Scorecard for Human Capital Management (HCM) - FY 2006, Quarter 4 Office: Energy Information Administration Progress Score: Status Score: Requirements for HCM Plan 4th QTR REQUIREMENTS FY 06, Q4 Comments Integrate HCM Plan into decision-making processes - Plan linked to DOE mission, strategy, and goals - designates accountable officials Link performance appraisal plans and awards to DOE mission & goals for SES, managers, and more than 60% of workforce (HQ and Field); discuss difference between various levels of performance, discuss consequences based on performance HCM is linked to EIA's mission, strategy, and goals. Employee performance plans have at least one critical element with corresponding tasks supporting

211

Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

World Shale Gas Resources: World Shale Gas Resources: An Initial Assessment of 14 Regions Outside the United States APRIL 2011 www.eia.gov U.S. Department of Energy Washington, DC 20585 The information presented in this overview is based on the report "World Shale Gas Resources: An Initial Assessment," which was prepared by Advanced Resources International (ARI) for the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. The full report is attached. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies.

212

Idaho Administrator's Memorandum on Transfer Processing Policies...  

Open Energy Info (EERE)

Administrator's Memorandum on Transfer Processing Policies and Procedures Author Idaho Water Management Division Administrator Recipient Water Management Division Published...

213

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...  

Office of Environmental Management (EM)

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS This schedule covers accountable...

214

Registration Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SNAP COLLABORATION MEETING JUNE 1 - 3, 2006 REGISTRATION FORM To register, please fill out the registration form below and click on the "SEND" button. Your registration will allow us to make security access and hospitality arrangements for you. Deadline: Please register NLT Wednesday, May 24, 2006. 1. Your Name (Last, First): 2. Your Institution: 3. Email address: 4. Citizenship (for non-DOE employees/guests): 5. Arrival date: 6. Departure Date: 7. Will you be attending the working dinner on Thursday, June 1? Yes No 8. Any dietary restrictions? Please click on the "Send" button below to email this form automatically to snap@lbl.gov. An automatic email reply receipt confirmation will be sent back to your email address. Send Reset Thank you!

215

Jordan | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jordan | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

216

Nonproliferation | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Related News DOENNSA Participates in Large-Scale CTBT On-Site Inspection Exercise in Jordan NIS receives two NAGC awards Charles E. Messick receives the Administrator's Gold...

217

russia | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

russia | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

218

Policy Procedure Administrative Directive Title: _____________________________________  

E-Print Network [OSTI]

Policy ­ Procedure ­ Administrative Directive Title: _____________________________________ Policy-President _____________ See also: Related Policies, Procedures and Agreements: Relevant Legislation and Regulations: ____________________________________________________________________________ Background and Purpose: ____________________________________________________________________________ Policy

Northern British Columbia, University of

219

PP-10 Bonneville Power Administrator  

Broader source: Energy.gov [DOE]

Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

220

PP-46 Bonneville Power Administration  

Broader source: Energy.gov [DOE]

Presidential Permit authorizing Bonneville Power Administration to contruct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Privacy Act Statement | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Statement | National Nuclear Security Administration Statement | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Privacy Act Statement Home > About Us > Our Operations > NNSA Office of General Counsel > Privacy Act (PA) of 1974 > Privacy Act Statement Privacy Act Statement Agency forms used to collect personal information protected by the Act must

222

2011 Form EIA-63B Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

U. S. DEPARTMENT OF ENERGY Form Approved U.S. ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0196 Washington, DC 20585 Expires: 12/31/2013 FORM EIA-63B ANNUAL PHOTOVOLTAIC CELL/MODULE SHIPMENTS REPORT GENERAL INFORMATION AND INSTRUCTIONS I. Purpose Form EIA-63B is designed to provide the data necessary for the U.S. Energy Information Administration (EIA), a part of the U.S. Department of Energy (DOE), to carry out its responsibilities tracking photovoltaic cell/module shipments in the photovoltaic industry and

223

Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

v*Zy- i , . v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ Administration Follow-up to Nov. 25, 2008 Transition Meeting Undeveloped Transmission Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line to relieve congestion in the Sacramento area. In addition, Western has rights-of- way for many transmission lines that could be rebuilt to increase transmission capacity. For example, Western's Tracy-Livermore 230-kV line is a single circuit line but the existing towers could support a double circuit line. These rights-of-way would have to

224

Form1  

Broader source: Energy.gov (indexed) [DOE]

B. U.S. DEPARTMENT OF ENERGY FORM 3304.2, B. U.S. DEPARTMENT OF ENERGY FORM 3304.2, APPROVAL OF EXPERT OR CONSULTANT EMPLOYMENT REQUEST U.S.DEPARTMENT OF ENERGY APPROVAL OF EXPERT OR CONSULTANT EMPLOYMENT REQUEST (Continued on Reverse) DOE F 3304.2 (01-07) 1. Name of Expert or Consultant: 2. Organization: 9. Current Employment (position, company, and location): 10. Home Address (city, state, and zip code): 11. Official Worksite (where services are to be performed): 12. APPROVALS 3. Action Requested: 4. Hourly Rate of Pay: 5. Nature of Appointment: 6. Period for Which Services Are Desired: 7. Estimated Number of Days to Be Worked: 8. Number of Days Worked Under Present Appointment: (Extension Only) 13. Description of Services Required: 14. Justification for this Expert/Consultant Action and Qualifications of Candidate Related to Need for Appointment:

225

Administration Policy Complete Policy Title  

E-Print Network [OSTI]

Administration Policy Complete Policy Title: McMaster University Alcohol Policy Policy Number, 1998 Supersedes/Amends Policy dated: May 11, 1998 Responsible Executive: Vice-President (Administration policy and the written copy held by the policy owner, the written copy prevails. INTRODUCTION Mc

Haykin, Simon

226

2011Form EIA-902 Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

FORM EIA-902 ANNUAL GEOTHERMAL HEAT PUMP SHIPMENTS REPORT GENERAL INFORMATION AND INSTRUCTIONS I. Purpose Form EIA-902 is designed to provide the data necessary for the U.S. Energy Information Administration (EIA), a part of the U.S. Department of Energy (DOE), to carry out its responsibilities tracking heat pump shipments in the geothermal heat pump industry and reporting information concerning the size and status of the industry. The data collected will be published in the Renewable Energy Annual and also be available through EIA's Internet site at http://www.eia.gov/fuelrenewable.html. II. Who Should Respond to This Survey This report is mandatory and required pursuant to the authority granted to the Department of Energy (DOE) by the Federal Energy Information Administration Act of 1974 (Public Law 93-

227

Howard Gruenspecht Deputy Administrator Duties  

Gasoline and Diesel Fuel Update (EIA)

Howard Gruenspecht Howard Gruenspecht Deputy Administrator Duties Howard Gruenspecht was named Deputy Administrator of the U.S. Energy Information Administration (EIA) in March 2003. As the EIA Deputy Administrator, Howard assists the Administrator in collecting, analyzing, and disseminating independent and impartial energy information to promote sound policy-making, efficient markets, and public understanding of energy and its interaction with the econo- my and the environment. EIA provides a wide range of information and data products covering energy production, stocks, demand, imports, exports, and prices. EIA also prepares analyses and special reports on topics of current interest. Howard works closely with the Administra- tor to provide overall leadership, planning, and policy direction for the

228

Form EIA-861 Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

ANNUAL ELECTRIC POWER ANNUAL ELECTRIC POWER INDUSTRY REPORT Form EIA-861 OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden: 9 Hours NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data protections see the provisions on sanctions and the provisions concerning the confidentiality of information in the instructions. Title 18 U.S.C. 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.

229

NNSA CX Determination Form (Final)(3).pdf  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Security Administration Nuclear Security Administration Categorical Exclusion Determination Form _____________________________________________________________________________________________ NEPA ID #: Project Title: Program or Field Office: Location: _____________________________________________________________________________________________ Proposed Action or Project Description: _____________________________________________________________________________________________ This action would not: threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, including DOE and/or Executive Orders; require siting, construction, or major expansion of waste storage, disposal, recovery, or treatment facilities, but may include such categorically

230

Better Buildings Neighborhood Program: Grants Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tools & Resources Tools & Resources Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Grants Administration to someone by E-mail Share Better Buildings Neighborhood Program: Grants Administration on Facebook Tweet about Better Buildings Neighborhood Program: Grants Administration on Twitter Bookmark Better Buildings Neighborhood Program: Grants Administration on Google Bookmark Better Buildings Neighborhood Program: Grants Administration on Delicious Rank Better Buildings Neighborhood Program: Grants Administration on Digg Find More places to share Better Buildings Neighborhood Program: Grants Administration on AddThis.com... Case Studies Resource Directory Webcasts Workshops Grants Administration Grants Administration Better Buildings Neighborhood Program award recipients were selected

231

October 15, 2002 Mr. Stephen Wright, Administrator  

E-Print Network [OSTI]

October 15, 2002 Mr. Stephen Wright, Administrator Bonneville Power Administration Routing A-1 P Power Administration: A Regional Dialogue on Options for Service After 2006 Dear Administrator Wright;Administrator Stephen Wright Chairman Frank Cassidy October 15, 2002 Page 2 Canby would have welcomed

232

Newsletters | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Newsletters | National Nuclear Security Administration Newsletters | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Newsletters Home > Media Room > Newsletters Newsletters NNSA publishes a monthly newsletter featuring current events and activities across the nuclear security enterprise. Online archives are available back

233

Announcements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Announcements | National Nuclear Security Administration Announcements | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Announcements Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract > Announcements

234

Thomas D. Williams Assistant Administrator  

Gasoline and Diesel Fuel Update (EIA)

Thomas D. Williams Thomas D. Williams Assistant Administrator for Resource and Tecnology Management Duties Thomas D. Williams is the Assistant Administrator for Resource & Technology Management. He provides leadership and direction to oversee the management and operation of EIA's employee services, information technology policy and operations, and integrated planning, budget, procurement, evaluation and project management activity. Biography Thom is a career member of the Senior Executive Service with more than 27 years of professional experience in developing, linking, and implementing successful strategic, financial, human capital, operational, technology, and administrative policies and plans for federal research, science, engineering, and regulatory programs.

235

Speeches | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Speeches | National Nuclear Security Administration Speeches | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Speeches Home > Media Room > Speeches Speeches NNSA officials frequently speak at public events around the world on topics ranging from nuclear security to infrastructure and strategic planning.

236

Supercomputers | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Supercomputers | National Nuclear Security Administration Supercomputers | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Supercomputers Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > Supercomputers

237

Speeches | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Speeches | National Nuclear Security Administration Speeches | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Speeches Home > Media Room > Speeches Speeches NNSA officials frequently speak at public events around the world on topics ranging from nuclear security to infrastructure and strategic planning.

238

Programs | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Programs | National Nuclear Security Administration Programs | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Programs Home > Field Offices > Welcome to the Sandia Field Office > Programs Programs The SFO Programs office is responsible for direction, day-to-day oversight and contract administration activities in support of the technical

239

Reading File Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reading File Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 POWER SERVICES In reply refer to: PG-5 Ms. Renata Kurschner Director, Generation Resource...

240

ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION  

Office of Legacy Management (LM)

.' :h I : ' ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION WASHINGTON, D.C. 20545 October 24, 1975 :.. ,. Memo to Piles' CARNEGIE-MELLON SC&RCCYCLOTRON On October 23, 1975, W....

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

U.S. Department of Energy Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Department of Energy Department of Energy Energy Information Administration Form EIA-5 (July 2011) Quarterly Coal Consumption and Quality Report Coke Plants Page 1 Form Approved OMB No. 1905-0167 Expires: 06/30/2014 Burden: 1.50 Hours General Instructions: A. PURPOSE. The EIA-5 survey collects data related to coal receipts, stocks, and coke production at U.S. coke plants. The data are collected to provide Congress with basic statistics concerning coal consumption, stocks, prices, and quality as required by the Federal Energy Administration Act of 1974 (FEAA) (P.L. 93-275), as amended. These data appear in the Annual Coal Report, the Quarterly Coal Report, the Monthly Energy Review, and the Annual Energy Review. In addition, the Energy Information Administration uses the data for coal demand analyses and in short-term modeling efforts, which produce forecasts of coal demand

242

Notices DEPARTMENT OF ENERGY U.S. Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

593 Federal Register 593 Federal Register / Vol. 77, No. 148 / Wednesday, August 1, 2012 / Notices DEPARTMENT OF ENERGY U.S. Energy Information Administration Proposed Agency Information Collection AGENCY: U.S. Energy Information Administration (EIA), Department of Energy (DOE). ACTION: Agency Information Collection Activities: Proposed Collection; Notice and Request for Comments. SUMMARY: EIA invites public comment on the proposed collection of information for the new Form EIA-915, ''Monthly Gas Processing and Liquids Report'' that EIA is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. This new form would replace Form EIA-64A, Annual Report of the Origin of Natural Gas Liquids, and Form EIA-816,

243

Chapter 30 - Cost Accounting Standards Administration | Department...  

Office of Environmental Management (EM)

30 - Cost Accounting Standards Administration Chapter 30 - Cost Accounting Standards Administration 30.1DOE'sOversightofCertainContractorDefinedPensionPlansandItsEffect...

244

Administration Announces Nearly $8 Billion in Weatherization...  

Office of Environmental Management (EM)

Administration Announces Nearly 8 Billion in Weatherization Funding and Energy Efficiency Grants Administration Announces Nearly 8 Billion in Weatherization Funding and Energy...

245

small business | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

National Nuclear Security Administration (NNSA) recently selected five small-business-led teams for its new Management, Organizational and Administrative Support Services Small...

246

Bonneville Power Administration (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration (WFP) Bonneville Power Administration (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy....

247

Western Area Power Administration Borrowing Authority, Recovery...  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Borrowing Authority, Recovery Act Western Area Power Administration Borrowing Authority, Recovery Act Microsoft Word - PSRP May 15 2009 WAPA...

248

Obama Administration Announces Billions in Lending Authority...  

Energy Savers [EERE]

Obama Administration Announces Billions in Lending Authority for Renewable Energy Projects and to Modernize the Grid Obama Administration Announces Billions in Lending Authority...

249

Comments of the Bonneville Power Administration | Department...  

Broader source: Energy.gov (indexed) [DOE]

the Bonneville Power Administration Comments of the Bonneville Power Administration BPA appreciates the opportunity to provide comments and information and submits the following...

250

Line Management Perspective: National Nuclear Security Administration...  

Broader source: Energy.gov (indexed) [DOE]

Perspective: National Nuclear Security Administration (NNSA) Addthis Description Slide Presentation by Jim McConnell, Acting Associate Administrator for Infrastructure and...

251

Partnering with Utilities and Other Program Administrators |...  

Broader source: Energy.gov (indexed) [DOE]

Partnering with Utilities and Other Program Administrators Partnering with Utilities and Other Program Administrators U.S. Department of Energy (DOE) Technical Assistance Program...

252

Obama Administration Announces New Partnership on Unconventional...  

Energy Savers [EERE]

Obama Administration Announces New Partnership on Unconventional Natural Gas and Oil Research Obama Administration Announces New Partnership on Unconventional Natural Gas and Oil...

253

Bush Administration Plays Leading Role in Studying and Addressing...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Secretary Samuel Bodman, Environmental Protection Agency (EPA) Administrator Stephen Johnson, and National Oceanic and Atmospheric Administration (NOAA) Administrator Vice...

254

STATEMENT OF ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION  

Broader source: Energy.gov (indexed) [DOE]

ADAM SIEMINSKI ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION U.S. DEPARTMENT OF ENERGY before the SUBCOMMITTEE ON ENERGY AND POWER COMMITTEE ON ENERGY AND COMMERCE U. S. HOUSE OF REPRESENTATIVES JUNE 26, 2013 2 Chairman Whitfield, Ranking Member Rush and Members of the Subcommittee, thank you for the opportunity to appear before you today to discuss the Renewable Fuel Standard (RFS) program. The U.S. Energy Information Administration (EIA) is the statistical and analytical agency within the U.S. Department of Energy. EIA collects, analyzes, and disseminates independent and impartial energy information to promote sound policymaking, efficient markets, and public understanding regarding energy and its interaction with the economy and the environment. By law, EIA's data, analyses, and

255

STATEMENT OF ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION  

U.S. Energy Information Administration (EIA) Indexed Site

STATEMENT OF ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION U.S. DEPARTMENT OF ENERGY before the SUBCOMMITTEE ON ENERGY AND POWER COMMITTEE ON ENERGY AND COMMERCE U. S. HOUSE OF REPRESENTATIVES FEBRUARY 5, 2013 2 Mr. Chairman and Members of the Subcommittee, I appreciate the opportunity to appear before you today at this hearing on American Energy Security and Innovation: An Assessment of North America's Energy Resources. The U.S. Energy Information Administration (EIA) is the statistical and analytical agency within the U.S. Department of Energy. EIA collects, analyzes, and disseminates independent and impartial energy information to promote sound policymaking, efficient markets, and public understanding regarding energy and its interaction with the economy and the environment. EIA is the Nation's premier source of

256

MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION  

Broader source: Energy.gov (indexed) [DOE]

0, 2004 0, 2004 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION THE DIRECTOR, OFFICE OF MANAGEMENT, BUDGET AND EVALUATION/CHIEF FINANCIAL OFFICER FROM: William S. Maharay r Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: Federal Managers' Financial Integrity Act Audit Report Audit Report No.: OAS-L-05-01 We reviewed selected aspects of the Department of Energy's (Department) implementation of the Federal Managers' Financial Integrity Act (FMFIA) of 1982. The objective of FMFIA, and the Department's management control program, is to ensure that controls are working effectively and that program and administrative functions are performed in an economic and efficient marner consistent with applicable laws. As a result of its evaluation of management controls, the Department identified "significant

257

STATEMENT OF ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT OF ADAM SIEMINSKI STATEMENT OF ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION U.S. DEPARTMENT OF ENERGY Before the COMMITTEE ON ENERGY AND NATURAL RESOURCES U. S. SENATE JULY 16, 2013 2 Chairman Wyden, Ranking Member Murkowski, and Members of the Committee, thank you for the opportunity to appear before you today to discuss the U.S. petroleum supply system, which is changing rapidly. The U.S. Energy Information Administration (EIA) is the statistical and analytical agency within the U.S. Department of Energy. EIA collects, analyzes, and disseminates independent and impartial energy information to promote sound policymaking, efficient markets, and public understanding regarding energy and its interaction with the economy and the environment. By law, EIA's data, analyses, and

258

STATEMENT OF ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION  

Broader source: Energy.gov (indexed) [DOE]

ADAM SIEMINSKI ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION U.S. DEPARTMENT OF ENERGY BEFORE THE SUBCOMMITTEE ON ENERGY COMMITTEE ON SCIENCE, SPACE AND TECHNOLOGY UNITED STATES HOUSE OF REPRESENTATIVES FEBRUARY 13, 2013 Chairman Lummis, Ranking Member Swalwell and Members of the Committee, I appreciate the opportunity to appear before you today to provide testimony on the U.S. energy outlook. The U.S. Energy Information Administration (EIA) is the statistical and analytical agency within the U.S. Department of Energy. EIA collects, analyzes, and disseminates independent and impartial energy information to promote sound policymaking, efficient markets, and public understanding regarding energy and its interaction with the economy and the environment. EIA is the Nation's premier source of

259

LFS Subcontract Form of Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SFA (Rev. 5, 4/5/13) Subcontract Form of Agreement SFA (Rev. 5, 4/5/13) Subcontract Form of Agreement Dated 5-20-13 Subcontract No. 241314 Page 1 of 2 Subcontract Form of Agreement Subcontractor: TBD Subcontract No.: 241314 Address: * Contact: * Telephone: * Facsimile: * E-mail: * D-U-N-S No.: * NAICS Code: 334111 This subcontract, effective on the date of signature by the last party to sign, is hereby made and entered into by and between Los Alamos National Security, LLC (CONTRACTOR), and the above named SUBCONTRACTOR who hereby agree that all Work specified below, which is a portion of the goods and services to be provided by CONTRACTOR for the United States Department of Energy National Nuclear Security Administration (OWNER), shall be performed by the SUBCONTRACTOR in accordance with all

260

Events | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Events | National Nuclear Security Administration Events | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Events Home > Media Room > Events Events Learn more about upcoming events in your community and find out how to request NNSA involvement at your next event. Event Nov 2, 2011 Webinar: Proposed Changes to the CFR Part 810 Regulation

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Pollux | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Pollux | National Nuclear Security Administration Pollux | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Video Gallery > Pollux Pollux Pollux The National Nuclear Security Administration (NNSA) announced that Pollux, a subcritical experiment, was successfully conducted at its Nevada National Security Site (NNSS). This video is of the vessel containing the Pollux experiment.

262

Budget | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Budget | National Nuclear Security Administration Budget | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Budget Home > About Us > Budget Budget Full details of the President's FY14 budget for NNSA can be found here. We're keeping the American people safe. President Obama has laid out the most ambitious view of nuclear security in decades. Our

263

Leadership | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Leadership | National Nuclear Security Administration Leadership | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Leadership Home > Field Offices > Welcome to the Livermore Field Office > Leadership Leadership Kimberly D. Lebak, Manager Kim Lebak became the Livermore Site Manager in January, 2012 for the National Nuclear Security Administration of the U.S. Department of Energy.

264

Budget | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Budget | National Nuclear Security Administration Budget | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Budget Home > About Us > Budget Budget Full details of the President's FY14 budget for NNSA can be found here. We're keeping the American people safe. President Obama has laid out the most ambitious view of nuclear security in decades. Our

265

Events | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Events | National Nuclear Security Administration Events | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Events Home > Media Room > Events Events Learn more about upcoming events in your community and find out how to request NNSA involvement at your next event. Event Nov 2, 2011 Webinar: Proposed Changes to the CFR Part 810 Regulation

266

Accomplishments | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Accomplishments | National Nuclear Security Administration Accomplishments | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Accomplishments Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > About ASC > Accomplishments

267

Operations | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Operations Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Operations Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all

268

SOUTHWESTERN POWER ADMINISTRATION ANNUAL REPORT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ADMINISTRATION ADMINISTRATION ANNUAL REPORT 20 10 This page inTenTionally lefT blank. S o u t h w e S t e r n p o w e r a d m i n i S t r at i o n pa g e 1 2010 a n n u a l r e p o r t Table of conTenTs Letter to the Secretary ------------------------------------------------------------------------------------- 3 Southwestern System Map ------------------------------------------------------------------------------- 4 About Southwestern --------------------------------------------------------------------------------------- 5 Supplementary Information ------------------------------------------------------------------------------ 6 Southwestern Federal Power System Energy Production -------------------------------

269

Procurement | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Procurement | National Nuclear Security Administration Procurement | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Procurement Home > About Us > Our Operations > Acquisition and Project Management > Small Business > Procurement Procurement NNSA's Small Business program serves as the Info-structure through which NNSA effectively disseminates information regarding our small business

270

Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Operations Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Operations Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all

271

Testimonials | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Testimonials | National Nuclear Security Administration Testimonials | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Testimonials Home > Federal Employment > Working at NNSA > Testimonials Testimonials At the NNSA, you will have the opportunity to work with some of the brightest professionals in the world who routinely tackle highly complex

272

Compensation | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Compensation | National Nuclear Security Administration Compensation | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Compensation Home > Federal Employment > Working at NNSA > Compensation Compensation Whether you're a new college graduate, someone with industry experience looking to move into a Federal job or a current government employee looking

273

Overview | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Overview | National Nuclear Security Administration Overview | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Overview Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > About ASC > Overview Overview

274

Development Administration By Alice Buck  

Broader source: Energy.gov (indexed) [DOE]

Energy Research and Development Administration By Alice Buck March 1982 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 Introduction Congress created the Energy Research and Development Administration on October 11, 1974, in response to the Nation's growing need for additional sources of energy. The new agency would coordinate energy programs formerly scattered among many federal agencies, and serve as the focal point for a major effort by the Federal Government to expand energy research and development efforts. New ways to conserve existing supplies as well as the commercial

275

Accomplishments | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Accomplishments | National Nuclear Security Administration Accomplishments | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Accomplishments Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > About ASC > Accomplishments

276

International | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

International | National Nuclear Security Administration International | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog International Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > International International U.S. Department of Energy / U.S. Nuclear Regulatory Commission

277

Contact | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Contact | National Nuclear Security Administration Contact | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Contact Home > About Us > Our Locations > Albuquerque Complex > Federal Asian Pacific American Council - New Mexico Chapter Albuquerque, NM > Contact Contact "Promoting Equal Opportunity and Cultural Diversity for APAs in Government"

278

Management & Administration | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management & Administration Management & Administration Management & Administration Management & Administration The Office of Management and Administration directs the development, coordination, and execution of overall OIG management and administrative policy and planning. This responsibility includes directing the OIG's strategic planning process, financial management activities, personnel management and security programs, administrative support services, and information resources programs. In addition, the staff members from this Office represent the Inspector General at hearings, negotiations, and conferences on budget, financial, managerial, and other resource matters. The staff also coordinates activities of the Council of Inspector's General on Integrity and Efficiency. The Office is organized into two

279

Federal Energy Management Program: General Services Administration -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

General Services General Services Administration - Suitland, Maryland to someone by E-mail Share Federal Energy Management Program: General Services Administration - Suitland, Maryland on Facebook Tweet about Federal Energy Management Program: General Services Administration - Suitland, Maryland on Twitter Bookmark Federal Energy Management Program: General Services Administration - Suitland, Maryland on Google Bookmark Federal Energy Management Program: General Services Administration - Suitland, Maryland on Delicious Rank Federal Energy Management Program: General Services Administration - Suitland, Maryland on Digg Find More places to share Federal Energy Management Program: General Services Administration - Suitland, Maryland on AddThis.com... Energy-Efficient Products

280

Users Frequently Asked Questions | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Users Frequently Asked Questions | National Nuclear Security Administration Users Frequently Asked Questions | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Users Frequently Asked Questions Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Frequently Asked Questions > Users Frequently Asked Questions

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

DOE Form 4250.2, Request for Supplies, Equipment or Services...  

Broader source: Energy.gov (indexed) [DOE]

as: Engraving More Documents & Publications Requisition for Supplies, Equipment, or Service DOE Form 4250.2 Customer Services Handbook, 2010, Office of Administration DOE F 4250.2...

282

SUBJECT: National Nuclear Security Administration  

Broader source: Energy.gov (indexed) [DOE]

National Nuclear Security Administration Sandia Site Ofce P. 0. Box 5400 Albuquerque, NM 87185 JAN O=P= ONP= Annual National Environmental Policy Act Planning Sumary 2013 Attached is: the Annual National Environmental Policy Act (NEPA) Planning Summary for the National Nuclear Security Administation, Sandia Site Ofce (SSO). Currently, there are two environmental assessments planned and one environmental impact statement in progess for the

283

ADMINISTRATIVE GUIDE TO STUDENT ACCOUNTS  

E-Print Network [OSTI]

ADMINISTRATIVE GUIDE TO STUDENT ACCOUNTS UNIVERSITY CASHIER'S OFFICE 2005 Harris Hall 515-2986 http://www.fis-2985 Tuition Waivers ......................................................... 513-4264 Cashier's Office: http://www.fis.ncsu.edu/cashier/ Billing Calendars: http://www.fis.ncsu.edu/cashier/billing/billsched.asp Sponsored Students: http://www.fis

284

National Aeronautics and Space Administration  

E-Print Network [OSTI]

National Aeronautics and Space Administration Launch Services Program Earth's Bridge to Space 2012 roles, getting rockets and satellites ready for flight, on their way, and all the way to orbit absolutely instrumental for the United States to have access to a dependable and secure Earth-to-space bridge

285

National Nuclear Security Administration Pantex Site Office  

Broader source: Energy.gov (indexed) [DOE]

NEP A Compliance Officer Rationale NEP A Compliance Officer Rationale Pantex Site Office Proj. No.: MWO-ll-004-C NEPA ID No.: PXP-ll-0001 Parking Lot South of Bullding 16-35 Application of DOE NEPA Procedure: Categorical Exclusion B1.15, Applicable to Facility Operations (10 CFR Part 1021, Subpart 0, Appendix B), applies to this proposal. Therefore, neither an Environmental Assessment nor an Environmental Impact Statement is necessary for the activity described in NEPA Review Form (NRF) PXP-II-000l, which is hereby incorporated by reference. Rationale: The U.S. Department of Energy, National Nuclear Security Administration, proposes to construct a permanent parking lot south of Building 16-35 on the Pantex Plant. The parking lot would be approximately 220 feet in length and 170 feet wide. Four metal culverts,

286

Frequently Asked Questions | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Programs > Nuclear Security > Nuclear Materials Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Frequently Asked Questions Frequently Asked Questions U.S. Department of Energy / U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards System Frequently Asked Questions (FAQs) User Frequently Asked Questions What is the History of NMMSS? What Are the Other Uses of NMMSS? NMMSS is sponsored by the National Nuclear Security Administration's (NNSA) Office of Materials Integration within the U.S. Department of Energy and the U.S. Nuclear Regulatory Commission Printer-friendly version Printer-friendly version Facebook Twitter Youtube Flickr Learn More Users Frequently Asked Questions What Are the Other Uses of NMMSS?

287

National Nuclear Security Administration Pantex Site Office  

Broader source: Energy.gov (indexed) [DOE]

Pantex Site Office Pantex Site Office P. 0. Box 30036 Amarillo, TX 79120 JAN 1 2 2011 MEMORANDUM FOR: KENNETH W. POWERS ASSOCIATE ADMINISTRATOR FOR STEVEN C. ERHART MANAGER FROM: SUBJECT: Submission of Annual National Environmental Policy Act (NEPA) Planning Summaries for Fiscal Year 20 1 1 Please reference your memorandum dated December 17,2010, subject as above. Attached are the Pantex Site Ofice (PXSO) Annual NEPA Planning Summaries. All PXSO NEPA documentation expected in the near future or already under development is listed in these forms. This information is being disseminated through the Pantex Website at www.pantex.com and will be made available to the public in area Department of Energy Information Repositories. The PXSO does not anticipate preparing any Environmental Assessments within the next 12 months or

288

APPENDIX A: Forms and Instructions Form Form R93D-44 Form R93D-03  

U.S. Energy Information Administration (EIA) Indexed Site

APPENDIX A: Forms and Instructions APPENDIX A: Forms and Instructions Form Form R93D-44 Form R93D-03 Form R93D-59 Instructions Form RT94-02 Form RT94-04 Form RT94-0! Form RT94-03 Form RT94-05 Form RT94-06 Instructions Form RT94-09 Instructions Form RT94-10 Form RT94-07 Form RT94-08 Form RT94-17 Form RT94-19 Form RT94-24 Form RT94-15 Form RT94-13 Form RT94-22 Form RT94-26 Form RT94-18 Form RT94-20 FormRT94-16 Form RT94-14 Form RT94-21 Form RT94-25 FormRT94-ll Form RT94-12 Form RT94-23 Form RT94-27 Section N (Vehicles) of 1993 RECS Questionnaire ............. Cover Letter for VIN Follow-up ........................... Vehicle Information Card (yellow, front only) ................. 1993 RECS Mail Questionnaire, Pages 4-5 (vehicle pages only) .... Instructions for Assembling RTECS Mid-Year Mailings ..........

289

EIA Energy Kids - Energy Kids: Energy Information Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Information Administration - Energy Kids Information Administration - Energy Kids ENTER KEYWORDS Energy Kids: Energy Information Administration What Is Energy? » Energy Basics Forms of Energy Laws of Energy Sources of Energy Energy Units Basics Energy Calculators Periodic Table Energy Sources » Nonrenewable Oil (petroleum) Natural Gas Coal Uranium (nuclear) Renewable Biomass Geothermal Hydropower Solar Wind Electricity Science of Electricity Electricity in the U.S. Hydrogen Recent Statistics Using & Saving Energy » Energy Use Basics Energy and the Environment Greenhouse Gases In Homes In Commercial Buildings In Industry For Transportation Saving Energy Recycling History of Energy » Energy Timelines Coal Electricity Ethanol Geothermal Hydropower Municipal Solid Waste Natural Gas Nuclear Oil (petroleum) Photovoltaic Solar Thermal

290

PIA - Management and Administration (MA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PIA - Management and Administration (MA) PIA - Management and Administration (MA) PIA - Management and Administration (MA) The E-Government Act of 2002 requires Federal agencies to perform Privacy Impact Assessments (PIAs), an analysis of how information is handled, in order: (i) to ensure handling conforms to applicable legal, regulatory, and policy requirements regarding privacy, (ii) to determine the risks and effects of collecting, maintaining and disseminating information in identifiable form in an electronic information system, and (iii) to examine and evaluate protections and alternative processes for handling information to mitigate potential privacy risks. The DOE PIA process helps to ensure privacy protections are considered and implemented throughout the system life cycle. Following are all PIAs that have been done for Management and

291

Forms | Department of Energy  

Office of Environmental Management (EM)

by Number Management & Administration 0000 - 1999 Legal 2000 - 2999 Personnel Management 3000 - 3999 Logistic Management 4000 - 4999 Program Planning & Management 5000 - 5999 HQ...

292

APPLICATION FORM GRADUATE ASSISTANTSHIP  

E-Print Network [OSTI]

Administration) MA Communication MFA Creative Writing MA Criminal Justice Engineering: MS Civil Engineering MS Computer Engineering MS Electrical Engineering MS Mechanical Engineering MA English MS

Barrash, Warren

293

User Financial Account Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rates vary by fiscal year and by the type of expenses incurred. Other Misc. Charges: Safeguard & Security charge applied to all non-DOE projectsfacilities. Federal Administrative...

294

Chapter 02 - Administrative Control of Funds  

Broader source: Energy.gov (indexed) [DOE]

. Administrative Control of Funds 2-1 . Administrative Control of Funds 2-1 CHAPTER 2 ADMINISTRATIVE CONTROL OF FUNDS 1. INTRODUCTION. a. Background/Authority. Title 31, section 1514, of the United States Code (31 U.S.C. 1514), Administrative Division of Apportionments, requires the Secretary of Energy to prescribe and carry out a system for administratively controlling funds. In compliance with this requirement, this chapter establishes the policy and general procedures for administrative control of funds within Department of Energy (DOE), and specifies the penalties that apply to persons who violate these procedures. Additional information regarding DOE's internal control requirements can be found in DOE O

295

National Nuclear Security Administration IUA  

Broader source: Energy.gov (indexed) [DOE]

IUA IUA '1.L'\I~~ Pantex Site Office IIV1'~~4j P. O. Box 30030 Amarillo, TX 79120 National Nuclear Security Administration NEPA Compliance Officer Rationale Pantex Site Office Proj. No.: EXP-IO-OlS-C NEPA ID No.: PXP-IO-OOOI Uninterruptable Power Supply (UPS)/Generator Replacement Application of DOE NEPA Procedure: Categorical Exclusions B 1.3 and B 1.23, Applicable to Facility Operations (10 CFR Part 1021 , Subpart D, Appendix B), apply to the proposed activity described below. Rationale: The U.S . Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Building 12-20, which is 225 square feet (sf) in size, along with a small concrete pad of approximately 32 sf. The building currently houses an inoperable

296

Nonproliferation | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Nonproliferation Home > About Us > Our Programs > Nonproliferation Nonproliferation One of the gravest threats the United States and the international community face is the possibility that terrorists or rogue nations will acquire nuclear weapons or other weapons of mass destruction (WMD). NNSA,

297

Veterans | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Veterans | National Nuclear Security Administration Veterans | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Veterans Home > Federal Employment > Our Jobs > Hiring Flexibilities > Veterans Veterans NNSA strives to be a model employer for veterans who wish to continue their service to the nation through civilian employment. When applying for NNSA

298

Engineering | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Engineering | National Nuclear Security Administration Engineering | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Engineering Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Engineering Engineering NNSA uses modern tools and capabilities in the engineering sciences field which are needed to ensure the safety, security, reliability and

299

Benefits | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Benefits | National Nuclear Security Administration Benefits | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Benefits Home > Federal Employment > Working at NNSA > Benefits Benefits The great jobs we have at NNSA also come with comprehensive benefits packages. They are among the best and most comprehensive available and play a vital role in demonstrating the Federal government and NNSA's

300

Recovery | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Recovery | National Nuclear Security Administration Recovery | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Recovery Home > About Us > Our Programs > Emergency Response > Planning for Emergencies > Recovery Recovery NNSA ensures that capabilities are in place to respond to any NNSA and Department of Energy facility emergency. It is also the nation's premier

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Tools & Resources: Grants Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grants Administration Grants Administration Better Buildings Neighborhood Program award recipients were selected through two competitive funding opportunity announcements (FOA): Energy Efficiency and Conservation Block Grant Program (EECBG): Retrofit Ramp-up and General Innovation Fund Programs (DE-FOA-0000148) State Energy Program (SEP) Special Project: Strengthening Building Retrofit Markets and Stimulating Energy Efficiency Action (DE-FOA-0000251) The U.S. Department of Energy (DOE) selected 34 EECBG recipients and seven SEP recipients in 2010. The 41 Better Buildings award recipients need to comply with DOE and American Recovery and Reinvestment Act of 2009 (ARRA) program regulations and guidance, as described in their award special terms and conditions. DOE has made a number of resources available to help grant recipients administer their programs and comply with federal financial assistance policies and regulations.

302

Weapons | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Weapons | National Nuclear Security Administration Weapons | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Weapons Home > Our Mission > Managing the Stockpile > Weapons Weapons The New START Treaty, which was signed in 2010, between the United States and Russian Federation will cap the strategic deployed nuclear arsenals of each country at 1,550 warheads, a nearly 75% reduction compared with the

303

Preparedness | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Preparedness | National Nuclear Security Administration Preparedness | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Preparedness Home > About Us > Our Programs > Emergency Response > Planning for Emergencies > Preparedness Preparedness NNSA ensures that capabilities are in place to respond to any NNSA and Department of Energy facility emergency. It is also the nation's premier

304

Benefits | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Benefits | National Nuclear Security Administration Benefits | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Benefits Home > Federal Employment > Working at NNSA > Benefits Benefits The great jobs we have at NNSA also come with comprehensive benefits packages. They are among the best and most comprehensive available and play a vital role in demonstrating the Federal government and NNSA's

305

Policy | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Policy | National Nuclear Security Administration Policy | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Policy Home > About Us > Our Programs > Emergency Response > Planning for Emergencies > Policy Policy NNSA ensures that capabilities are in place to respond to any NNSA and Department of Energy facility emergency. It is also the nation's premier

306

2011 Form EIA-63A Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

U. S. DEPARTMENT OF ENERGY U. S. DEPARTMENT OF ENERGY Form Approved U.S. ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0196 Washington, DC 20585 Expires: 12/31/2013 FORM EIA-63A ANNUAL SOLAR THERMAL COLLECTOR/REFLECTOR SHIPMENTS REPORT GENERAL INFORMATION AND INSTRUCTIONS I. Purpose Form EIA-63A is designed to provide the data necessary for the U.S. Energy Information Administration (EIA), a part of the U.S. Department of Energy (DOE), to carry out its responsibilities tracking collector/reflector shipments in the solar thermal industry and reporting information concerning the size and status of the industry. The data collected will be published in the Renewable Energy Annual and also be available through EIA's Internet site at http://www.eia.gov/fuelrenewable.html.

307

Microsoft Word - Comments to EIA on Form 861.docx  

Gasoline and Diesel Fuel Update (EIA)

TO: Howard Gruenspecht, Acting Administrator TO: Howard Gruenspecht, Acting Administrator Stephen Harvey, Assistant Administrator for Energy Statistics Stan Kaplan, Office Director Carolyn Moses, Project Manager, 826 and 861 Surveys U.S. Energy Information Agency FROM: Hilary Forster, Patrick Wallace, and Nicolas Dahlberg Evaluation and Research Team Consortium for Energy Efficiency SUBJECT: Suggestions for Modifications to Schedule 6 (Demand Side Management) of Form EIA-861 (2011) for 2013 Version of the Form DATE: April 29, 2013 I am writing in response to the opportunity to comment on the proposed Form EIA-861, "Annual Electric Power Industry Report". CEE is a consortium of energy efficiency program administrators from across the U.S. and Canada who work together on common approaches to advancing efficiency. CEE's members

308

Part IV: Section G: Contract Administration  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

G - Page ii PART I SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 Contracting Officer's Representative(s) 1 G.2 Contract Administration 1 G.3 Modification...

309

IT Administrator's Guide to Using Windows Vista  

E-Print Network [OSTI]

IT Administrator's Guide to Using Windows Vista® for Sustainable IT Success Published: February Administrator's Guide to Using Windows Vista for Sustainable IT Success Contents Executive Summary ................................................................................................ 3 Sustainable IT Goals

Narasayya, Vivek

310

October 18, 2002 Stephen J. Wright, Administrator  

E-Print Network [OSTI]

October 18, 2002 Stephen J. Wright, Administrator Bonneville Power Administration P.O. Box 3621 Service" ("Public Interest Proposal") Dear Mr. Wright and Mr. Cassidy: On September 12, 2002 the NW Energy

311

2014 Electricity Form Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

electricity data collection in 2014 via the following survey forms: Form EIA-63B, "Annual Photovoltaic CellModule Shipments Report" Form EIA-411, "Coordinated Bulk Power Supply...

312

cost savings | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

cost savings | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing...

313

institutional research | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

institutional research | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the...

314

Office of Administrative Operations (GC-90)  

Broader source: Energy.gov [DOE]

John D. (Dan) Bullington, Director of Administrative Operations 202-586-7364dan.bullington@hq.doe.gov

315

defense nuclear security | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

nuclear security | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

316

nuclear security | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

security | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

317

Chernobyl Nuclear Accident | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Chernobyl Nuclear Accident | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

318

Nuclear Incident Team | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Incident Team | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing...

319

nuclear navy | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

navy | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

320

Appendix E References | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

E References | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

weapons material protection | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

weapons material protection | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering...

322

test and evaluation | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

test and evaluation | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

323

nuclear threat science | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

threat science | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing...

324

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Office of Environmental Management (EM)

CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL,...

325

ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services...

326

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and...

327

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records...

328

Administrative Records Schedule 1 | Department of Energy  

Energy Savers [EERE]

labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health Administrative Records...

329

Nuclear Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

330

September 2011 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

331

Safeguards & Security | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

332

About SFO | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

333

Social Media | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

334

Facilities & Projects | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

335

The US Energy Information Administration and coal data  

Science Journals Connector (OSTI)

The newly formed US Department of Energy contains a quasi-independent Energy Information Administration charged with improving and augmenting the US energy data base. Given the importance of reliable data to the formulation of energy policy, this new organization should revise and update the various data collection systems it will inherit. One such effort is a series on coal distribution data, on which this communication focuses.

Thomas F. Hogarty

1978-01-01T23:59:59.000Z

336

National Nuclear Security Administration Overview  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 - 1, 2011 - Page 1 National Transportation Stakeholders Forum Denver, Colorado May 11, 2011 Ahmad Al-Daouk Manager, National Security Department (NSD) National Nuclear Security Administration (NNSA) Service Center - Albuquerque, NM May 11, 2011 - Page 2 National Transportation Stakeholders Forum (NTSF) * Introduction * NNSA Certifying Official Role * Offsite Source Recovery Project * Waste Shipments * Nuclear Materials Management Planning * Summary May 11, 2011 - Page 3 NNSA Plays a Critical Role: Ensuring our Nation's Security * Maintaining the safety, security and effectiveness of the nuclear weapons stockpile without nuclear testing * Reducing the global danger from the proliferation of nuclear weapons and materials * Provide safe and effective nuclear propulsion for the

337

Perceptions of selected senior administrators of higher education institutions in Mexico regarding needed administrative competencies  

E-Print Network [OSTI]

PERCEPTIONS OF SELECTED SENIOR ADMINISTRATORS OF HIGHER EDUCATION INSTITUTIONS IN MEXICO REGARDING NEEDED ADMINISTRATIVE COMPETENCIES A Dissertation by ELSA MARIA GONZALEZ Y GONZALEZ Submitted to the Office of Graduate... ? 2004 ELSA MARIA GONZALEZ Y GONZALEZ ALL RIGHTS RESERVED PERCEPTIONS OF SELECTED SENIOR ADMINISTRATORS OF HIGHER EDUCATION INSTITUTIONS IN MEXICO REGARDING NEEDED ADMINISTRATIVE COMPETENCIES A Dissertation by ELSA MARIA GONZALEZ Y...

Gonzalez y Gonzalez, Elsa Maria

2005-02-17T23:59:59.000Z

338

Acting NNSA Administrator Bruce Held visits Y-12 National Security...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Acting NNSA Administrator ... Acting NNSA Administrator Bruce Held visits Y-12 National Security Complex Posted: July 25, 2013 - 6:05pm Acting NNSA Administrator Bruce Held visits...

339

Land Record System PIA, Bonneville Power Administration | Department...  

Broader source: Energy.gov (indexed) [DOE]

Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record...

340

Energy Department Names Elliot Mainzer Bonneville Power Administration...  

Broader source: Energy.gov (indexed) [DOE]

Elliot Mainzer has been appointed Administrator for the Bonneville Power Administration (BPA), effective today. As one of four Power Marketing Administrations within the...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Optional Form 307  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS F DELIVERIES OR PERFORMANCE F1-3 G CONTRACT ADMINISTRATION DATA G1-5 L INSTRS., CONDS., AND NOTICES TO OFFERORS H...

342

STATEMENT OF ADAM SIEMINSKI ADMINISTRATOR ENERGY INFORMATION ADMINISTRATION  

U.S. Energy Information Administration (EIA) Indexed Site

Before the Before the COMMITTEE ON ENERGY AND NATURAL RESOURCES U. S. SENATE JULY 16, 2013 2 Chairman Wyden, Ranking Member Murkowski, and Members of the Committee, thank you for the opportunity to appear before you today to discuss the U.S. petroleum supply system, which is changing rapidly. The U.S. Energy Information Administration (EIA) is the statistical and analytical agency within the U.S. Department of Energy. EIA collects, analyzes, and disseminates independent and impartial energy information to promote sound policymaking, efficient markets, and public understanding regarding energy and its interaction with the economy and the environment. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States

343

Directory of energy data collection forms. Forms in use as of October 1995  

SciTech Connect (OSTI)

This is an authoritative listing of selected public use forms currently used as basic energy information gathering tools by the Department of Energy (DOE). This directory provides an overview of DOE`s energy information collection programs for decisionmakers in Government and industry. Forms designed to collect energy information and used by the Energy Information Administration (EIA) as of October 1995 are included in this directory. For each form listed in this directory, an abstract is included that describes the form`s uses, its respondents, and the data collected. For the reader`s convenience in finding specific types of collections, several indices have been provided in this directory. A listing of the forms grouped by energy source and function begins on page 26. Beginning on page 38 are the publications derived from the collections, and on page 50, are the forms linked to general respondent categories.

NONE

1996-01-01T23:59:59.000Z

344

OCPR Forms | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Prevention and Resulution (OCPR) Forms Request for Mediation Intake Form Technology Transfer Reporting Form Mediation Survey Form Form Instructions: Fill out the form and...

345

ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION  

Office of Legacy Management (LM)

.' :h I : .' :h I : ' ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION WASHINGTON, D.C. 20545 October 24, 1975 :~.. ,. Memo to Piles' CARNEGIE-MELLON S~C&RCCYCLOTRON On October 23, 1975, W. J. McCool (HQOS), E. K. Loop (HQ-OS), R. E. Allen (HQ-OS), J. Pingel (CH), B. 3. Davis (CH), R. Drucker (CR-BAO) and I met at Germantown to discuss the clean-up of radio- activity at the Saxonburg accelerator site. After discussion, we concluded acceptable criteria would include removal of all material necessary to reduce the residual surface activity to a maximum ofO.04 mR/hr above ambient background. Since ambient backgrounds is 0.03 to 0.05 &/hr, the above 0.04 mR/hr criterion will essentially be the 0.08 mR/hr (induced +background) case discussed previously.

346

Links | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Home > Field Offices > Welcome to the NNSA Production Office > Links Home > Field Offices > Welcome to the NNSA Production Office > Links Links NNSA HQ National Nuclear Security Administration Advanced Simulation & Computing NNSA Graduate Program NNSA Small Business Program Office of Defense Nuclear Nonproliferation Field Offices NNSA Albuquerque Complex Kansas City Field Office Livermore Field Office Los Alamos Field Office Naval Reactors Idaho Branch Office Nevada Field Office Sandia Field Office DOE Oak Ridge Sites Oak Ridge Office Oak Ridge National Laboratory UCOR Oak Ridge Institute for Science and Education Oak Ridge Site Specific Advisory Board American Museum of Science and Energy City of Oak Ridge Plants Laboratories Bechtel Nevada Bettis Laboratory Kansas City Plant Knolls Atomic Power Laboratory Lawrence Livermore National Laboratory

347

Forms | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forms Forms The following interactive Web-based forms in Adobe Acrobat Portable Document Format (PDF) are designed for online completion with Acrobat Reader 3.0 or above. Input...

348

Independent Specific Administrative Controls Review, Richland Operations  

Broader source: Energy.gov (indexed) [DOE]

Independent Specific Administrative Controls Review, Richland Independent Specific Administrative Controls Review, Richland Operations Office - December 2010 Independent Specific Administrative Controls Review, Richland Operations Office - December 2010 December 2010 Specific Administrative Controls Review with the Office of Environmental Management at DOE-Richland Operations Office The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security, participated in the Office of Environmental Management Office of Standards and Quality Assurance, EM-23, review of Specific Administrative Controls (SAC) at the Hanford Site. The EM-23 review included selected programs at the Hanford Site that are under the auspices of the DOE Richland Operations Office. Independent Specific Administrative Controls Review, Richland Operations

349

Organizational rhetoric from the Oval Office: a Weickian analysis of the Bush administration  

E-Print Network [OSTI]

presidents, as well as the inherent power differences between parties of the executive branch, will necessarily lead to a hierarchical form of administration organizationregardless of the person who occupies the top position. This does not mean, however... ORGANIZATIONAL RHETORIC FROM THE OVAL OFFICE: A WEICKIAN ANALYSIS OF THE BUSH ADMINISTRATION A Dissertation by JENNIFER WILLYARD Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment...

Willyard, Jennifer

2008-10-10T23:59:59.000Z

350

Bonneville Power Administration's Purchasing of Energy Savings  

E-Print Network [OSTI]

BONNEVILLE POWER ADMINISTRATION'S PURCHASE OF ENERGY SAVINGS Harold (Skip) Schick Leslie E. McMillan Bonneville Power Administration Port1and, Oregon INTRODUCTION The Bonneville Power Administration (BPA) is conducting a commercial... of several activities BPA is conductin9 to develop the capabil ity to conserve energy in the com mercial sector of electrical energy use. This paper describes the benefits of the approach, the program des ign, 1essons 1earned through field testing...

Schick, H.

351

Radiation recommendation series: administratively required dental radiographs  

SciTech Connect (OSTI)

Administrative requirements for radiographs are found in many segments of the United States health care system. This document presents an FDA radiation recommendation on administratively required dental x-ray examinations. In general, such examinations are not requested to further the patient's dental health, but rather as a means of monitoring claims. However, the administrative use of radiographs that have been taken in the normal course of patient care is usually appropriate, as long as the patient's right to privacy is respected.

Not Available

1981-09-01T23:59:59.000Z

352

RMOTC - Library - Example Forms  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Example Forms RMOTC will make every effort to provide the most current and correct information available. Please be aware that example forms are provided for informational purposes...

353

Power Subscription Strategy: Administrator`s Record of Decision.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to adopt a Power Subscription Strategy for entering into new power sales contracts with its Pacific Northwest customers. The Strategy equitably distributes the electric power generated by the Federal Columbia River Power System (FCRPS) within the framework of existing law. The Power Subscription Strategy addresses the availability of power; describes power products; lays out strategies for pricing, including risk management; and discusses contract elements. In proceeding with this Subscription Strategy, BPA is guided by and committed to the Fish and Wildlife funding Principles for the BPA announced by the Vice President of the US in September 1998. This Record of Decision (ROD) addresses the issues raised by commenters who responded to BPA`s Power Subscription Strategy Proposal during and after the comment period that began with the release of the Proposal on September 18, 1998. The ROD is organized in approximately the same way as the Proposal and the Power Subscription Strategy that BPA developed based on the comments received. Abbreviations of party names used in citations appear in the section just preceding this introduction; a list of all the commenters follows the text of the ROD.

United States. Bonneville Power Administration

1998-12-01T23:59:59.000Z

354

Contact Us | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

The National Nuclear Security Administration The National Nuclear Security Administration Contact Us Home > Field Offices > Welcome to the Sandia Field Office > Contact Us Contact Us If you have questions about activities at the Sandia Field Office, please contact the SFO Public Affairs Director at (505) 845-5264. Our mailing address is: U. S. Department of Energy, National Nuclear Security Administration, Sandia Field Office, P.O. Box 5400, Albuquerque, NM 87185. Printer-friendly version Printer-friendly version Facebook Twitter Youtube Flickr General Information About SFO Contact Us Contract Administration & Business Management Emergency Information Facilities & Projects Nuclear Operations Environment, Safety & Health Public Affairs Safeguards & Security Performance and Quality Assurance

355

Management and Budget | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Management and Budget Management and Budget The organization provides timely, cost-effective, and efficient administrative and financial support for NNSA headquarters...

356

federal budget | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

to support NNSA's continued Management and Budget The organization provides timely, cost-effective, and efficient administrative and financial support for NNSA headquarters...

357

U.S. Energy Information Administration (EIA)  

Gasoline and Diesel Fuel Update (EIA)

Executive Summary Background This report responds to a November 2010 request to the U.S. Energy Information Administration (EIA) from U.S. Representatives Roscoe G. Bartlett,...

358

Energy Information Administration (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

future. Energy Information Administration Responsible Contacts Thomas Wheeler Director, Workforce Analysis & Planning Division E-mail thomas.wheeler@hq.doe.gov Phone (202)...

359

emergency policy | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

policy | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

360

Research and Development | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Related News DOENNSA Participates in Large-Scale CTBT On-Site Inspection Exercise in Jordan Charles E. Messick receives the Administrator's Gold Award US Air Force Launches...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

March 2012 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Mar 23, 2012 Y-12 Site Office Recognized For Contributions To Combined Federal Campaign OAK RIDGE, Tenn. -- Employees of the National Nuclear Security Administration's Y-12 Site...

362

Security Procedures for Golden Laboratories and Administration...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security Procedures for Golden Laboratories and Administration Offices Visitors are required to show government-issued photo identification (for example driver's license, passport,...

363

Administrative Billing Procedures (pbl/contracts)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Post-2006) Subscription Contracts IOUPublic Settlement Slice of the System Billing Procedures Firstgov Power Business Line (PBL) Administrative Billing Procedures This page has...

364

April 2014 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Y-12 Press Release Apr 6, 2014 Security Improvements Project Completed Ahead of Schedule, 20 Million Under Budget The National Nuclear Security Administration's (NNSA) Security...

365

Administrator's Update - October 2014 | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

October 2014 | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

366

July 2014 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Y-12 Press Release Jul 1, 2014 Transition for Pantex and Y-12 Contract Completed The National Nuclear Security Administration Production Office and Consolidated Nuclear Security...

367

Administrator's Update - August 2014 | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

August 2014 | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

368

January 2014 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Y-12 Press Release Jan 3, 2014 Construction on Pantex High Explosives Pressing Facility Reaches 85% Mark Work on the National Nuclear Security Administration's (NNSA) High...

369

June 2014 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Press Release Jun 26, 2014 Waltzer Receives NNSA Gold Medal Award Karl Waltzer, Acting Deputy Manager of the National Nuclear Security Administration's Production Office, has...

370

Bonneville Power Administration Attachment P Oversupply Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Provider will displace all such Generators on a pro-rata basis. Bonneville Power Administration Attachment P Oversupply Management Protocol Open Access Transmission...

371

Audit Report National Nuclear Security Administration Nuclear...  

Broader source: Energy.gov (indexed) [DOE]

National Nuclear Security Administration Nuclear Weapons Systems Configuration Management DOEIG-0902 March 2014 U.S. Department of Energy Office of Inspector General Office of...

372

The National Nuclear Security Administration's Weapons Dismantlement...  

Office of Environmental Management (EM)

National Nuclear Security Administration's Weapons Dismantlement and Disposition Program OAS-L-13-06 January 2013 Department of Energy Washington, DC 20585 January 29, 2013...

373

material protection | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

protection | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

374

MPC&A | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

MPC&A | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

375

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Broader source: Energy.gov (indexed) [DOE]

9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS This schedule covers records documenting the movement of goods and persons...

376

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Energy Savers [EERE]

9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the...

377

Energy Information Administration - new releases. Volume 3  

SciTech Connect (OSTI)

This publication presents information compiled by the Energy Information Administration (EIA) on fuels, energy related topics, and the dissemination of other EIA publications.

NONE

1996-11-01T23:59:59.000Z

378

Summary References | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

to C. Chambellan, National Nuclear Security Administration, dated November 8. PNNL 2013a TVA (Tennessee Valley Authority) 2007. Final Supplemental Environmental Impact...

379

Management & Administration Reports | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reports Management & Administration Reports October 17, 2014 Special Review: DOEIG-0923 Issues Pertaining to the Termination of Ms. Donna Busche, a Contractor Employee...

380

design basis threat | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

design basis threat | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Independent Oversight Review, National Nuclear Security Administration...  

Office of Environmental Management (EM)

- February 2014 February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of...

382

Australia HEU Removal | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Australia HEU Removal | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the...

383

Argentina HEU Removal | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Argentina HEU Removal | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the...

384

Hazardous Material Packaging for Transport - Administrative Procedures  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establ1sh administrative procedures for the certification and use of radioactive and other hazardous materials packaging by the Department of Energy (DOE).

1986-09-30T23:59:59.000Z

385

New Solicitations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Plasmas (HEDLP) Program New Solicitation The Department of Energy's Office of Science and the National Nuclear Security Administration's Office of Inertial Confinement...

386

Independent Oversight Review, Bonneville Power Administration...  

Office of Environmental Management (EM)

and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. The review is one of several BPA initiatives to improve...

387

Power Marketing Administration Emergency Management Program Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual establishes emergency management policy and requirements for emergency planning, preparedness, readiness assurance, and response for the Department's Power Marketing Administrations. Cancels DOE O 5500.11.

2008-09-18T23:59:59.000Z

388

Fact Sheets | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

to prevent acts of nuclear terrorism. Fact Sheet Mar 23, 2012 Domestic U.S. Reactor Conversions: Fact Sheet The National Nuclear Security Administration (NNSA) helps convert...

389

PP-10-1 Bonneville Power Administrator  

Broader source: Energy.gov [DOE]

Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

390

The Maritime Administration's Energy and Emissions Program -...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies Program The Maritime Administration's Energy and Emissions Program - Part 2 Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility...

391

CRAD, Specific Administrative Controls - December 14, 2007 |...  

Office of Environmental Management (EM)

2007 Specific Administrative Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry (HSS CRAD 64-32) This Criteria Review and Approach Document (HSS CRAD...

392

October 2014 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Harrington, NNSA Deputy Administrator, Defense Nuclear Nonproliferation; and Morgan Smith, Chief Operating Officer, Consolidated Nuclear Security. The free course taught at...

393

Energy Information Administration / Petroleum Marketing Annual...  

U.S. Energy Information Administration (EIA) Indexed Site

55 Energy Information Administration Petroleum Marketing Annual 1997 Prices of Petroleum Products Table 31. Motor Gasoline Prices by Grade, Sales Type, PAD District, and State...

394

wind energy | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

wind energy | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

395

secretary award | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

The National Nuclear Security Administration (NNSA) was recently presented with the Secretary's Award for Project Management Excellence for delivering the Chemistry and Metallurgy...

396

ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and...

397

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

398

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS | Department...  

Broader source: Energy.gov (indexed) [DOE]

AUDIOVISUAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS This schedule covers audiovisual and related records created by or for Department and those acquired in...

399

ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision...  

Broader source: Energy.gov (indexed) [DOE]

AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for...

400

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

0: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Obama Administration Officials to Announce Job-Creating Grid Modernization  

Broader source: Energy.gov (indexed) [DOE]

Officials to Announce Job-Creating Grid Officials to Announce Job-Creating Grid Modernization Pilot Projects Obama Administration Officials to Announce Job-Creating Grid Modernization Pilot Projects October 4, 2011 - 5:03pm Addthis WASHINGTON, D.C. - Interior Secretary Ken Salazar, Agriculture Secretary Tom Vilsack, White House CEQ Chair Nancy Sutley, and Senior Advisor to the Secretary of Energy Lauren Azar will hold a press conference call to announce grid modernization pilot projects for accelerated Federal permitting tomorrow, October 5, 2011 at 11:30 a.m. EDT. The Administration's recently formed Rapid Response Team for Transmission (RRTT) will announce steps to accelerate responsible and informed deployment of several key transmission facilities. When built, the pilot projects will create thousands of construction and operations jobs, and

402

Nature of Transactions (TI) Code | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nature of Transactions (TI) Code | National Nuclear Security Administration Nature of Transactions (TI) Code | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Nature of Transactions (TI) Code Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Code Tables > Nature of Transactions (TI) Code

403

U.S. Department of Energy Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

EIA-3 Instructions EIA-3 Instructions (July 2011) Quarterly Coal Consumption and Quality Report Manufacturing and Transformation/Processing Coal Plants and Commercial and Institutional Coal Users Page 1 Form Approved OMB No. 1905-0167 Expires: 06/30/2014 Burden: 1.25 Hours GENERAL INFORMATION: A. PURPOSE. Using the EIA-3 survey, the Energy Information Administration collects data from U.S. manufacturing plants, coal transformation/processing plants, and commercial and institutional users of coal. This survey allows the EIA to provide Congress with basic statistics concerning coal consumption, stocks, prices, and quality as required by the Federal Energy Administration Act of 1974 (FEAA) (P.L. 93-275), as amended. Data collected on this survey appear in the

404

Form Approval: OMB No. 1905-0129  

U.S. Energy Information Administration (EIA) Indexed Site

Due Date: 2013 Due Date: 2013 Form Approval: OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden hours: 0.75 SCHEDULE 1. IDENTIFICATION Contact Information Form EIA-861S ANNUAL ELECTRIC POWER INDUSTRY REPORT (Short Form) NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data protections see the provisions on sanctions and the provisions concerning the confidentiality of information in the instructions. Title 18 U.S.C. 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction. Entities that report using the Form EIA-861 do

405

Madelyn Creedon Confirmed as Principal Deputy Administrator for the National Nuclear Security Administration  

Broader source: Energy.gov [DOE]

WASHINGTON Madelyn Creedon was confirmed by the Senate on Wednesday, July 23, 2014, as the Department of Energys (DOE) Principal Deputy Administrator for the National Nuclear Security Administration (NNSA).

406

SRS - Retiree Benefits - Forms  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Forms Forms Medical Forms Return completed forms to: 5-200 Health Care Programs Enrollment Change Benefits Solutions Service Center Bldg 703-47A, Aiken, SC 29808 5-340 Medical Claim Form Claims Processing Center P.O. Box 100300, Columbia, SC 29202 -- Pharmacy Claim Form Caremark Prescription Drug Claim Processing Center, P.O. Box 52059, Phoenix, AZ 85072-2059 Dental Forms Return completed forms to: 5-200 Health Care Programs Enrollment Change Benefits Solutions Service Center Bldg 703-47A, Aiken, SC 29808 5-342 Dental Claim Form Claims Processing Center P.O. Box 100300, Columbia, SC 29202 Life Insurance Return completed forms to: 5-171 Contributory Group Life Application and Deduction Authorization Benefits Solutions Service Center Bldg 703-47A, Aiken, SC 29808

407

A Guide to Careers in Administrative Law  

E-Print Network [OSTI]

? In his work with the Southern Environmental Law Center, Blan Holman advocates preserving, have in common? All of them use the tools of administrative law to effect positive change in policies from food labels to public benefits to nuclear waste disposal. Administrative law refers generally

Wolfe, Patrick J.

408

Cell Phone Allowance Responsible Administrative Units  

E-Print Network [OSTI]

Cell Phone Allowance Policy Responsible Administrative Units: Office of Finance & Administration 1 of 3 1.0 BACKGROUND It is essential for certain employees in some circumstances to use cell phones of Colorado policy that dictates use of a state-provided cell phone or smartphone. Additionally, the Internal

409

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208) Biological Opinion (BiOp). Bonneville Power Administration (BPA) supports the effort of developing a common-3621 ENVIRONMENT, FISH AND WILDLIFE May 18, 2009 In reply refer to: KEW-4 Ms. Nancy Leonard Northwest Power

410

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 and Conservation Council (Council) members have asked that Bonneville Power Administration (Bonneville) make its in the rating process. As you know, the Northwest Power Act obligates Bonneville to use its authorities to fund

411

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 about the amount and nature of cost-sharing offered. As a result, Bonneville Power Administration, Chairman Northwest Power and Conservation Council 851 S.W. Sixth Ave., Suite 1100 Portland, OR 97204

412

Bonneville Power Administration 1998 Annual Report.  

SciTech Connect (OSTI)

This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

413

Engineering Administration Health and Safety Committee  

E-Print Network [OSTI]

Engineering Administration Health and Safety Committee Faculty of Applied Science and Engineering and BCIT D) Alan mentioned how dangerous the pedestrian crossing across from the Bahen Centre and Galbraith, Ex-officio, Faculty Joint Health and Safety Committee) cc: Engineering Administration Health

414

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 to Independent Scientific Review Panel (ISRP) review, Bonneville Power Administration (BPA) and the Columbia: Mr. Micah Russell, CREST (electronic mail) #12;Oregon Clatsop County ~ City of Astoria ~ City

415

October 17, 2002 Steven J. Wright, Administrator  

E-Print Network [OSTI]

October 17, 2002 Steven J. Wright, Administrator Bonneville Power Administration Post Office Box Avenue, Suite 1100 Portland, OR 97204 Re: POST-2006 ELECTRIC SERVICE Dear Mr. Wright and Mr. Cassidy of the District's wheeling customers (Port Townsend Paper Company). In addition, the #12;Steven J. Wright

416

National Aeronautics and Space Administration Sun  

E-Print Network [OSTI]

National Aeronautics and Space Administration Sun #12;National Aeronautics and Space Administration Sun LG-2001-08-527-HQ Our SUN has inspired mythology in almost all cultures, including ancient Egyptians, Aztecs, Native Americans, and Chinese. We now know that the Sun is a huge, bright sphere

Christian, Eric

417

Form:SampleForm | Open Energy Information  

Open Energy Info (EERE)

SampleForm Jump to: navigation, search Input the name of a Test Page below. If the resource already exists, you will be able to edit its information. AddEdit a Test Page The text...

418

NMMSS Information, Reports & Forms | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Information, Reports & Forms | National Nuclear Security Information, Reports & Forms | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog NMMSS Information, Reports & Forms Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms NMMSS Information, Reports & Forms

419

A History of the Southeastern Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Southeastern Power Administration Southeastern Power Administration 1990-2010 SERVING SOUTHEAST the Distribu teD by us Department of energy southeastern Power Administration 2012 A History of the Southeastern Power Administration 1990-2010 SERVING SOUTHEAST the ii Project contribu tors Sponsor us Department of energy, southeastern Power Administration Contracting Agency us Army corps of engineers, Mobile District Author Patricia stallings, brockington and Associates, inc. Design and Editing john cason and Alicia sullivan, brockington and Associates, inc. iii AcknowleDgeMents The author gratefully acknowledges the efforts of many individuals who contributed to make this history possible. Mrs. Melissa chastain sease initiated the project and worked tirelessly to facilitate an excellent research environment and also established an efficient

420

Anne Harrington | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Anne Harrington | National Nuclear Security Administration Anne Harrington | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Leadership > Anne Harrington Anne Harrington Deputy Administrator for Defense Nuclear Nonproliferation Anne Harrington Anne Harrington was sworn in as Deputy Administrator for Defense Nuclear Nonproliferation for the National Nuclear Security Administration in

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Michael K. Lempke | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Michael K. Lempke | National Nuclear Security Administration Michael K. Lempke | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Leadership > Michael K. Lempke Michael K. Lempke Associate Principal Deputy Administrator Lempke Michael K. Lempke is the Associate Principal Deputy Administrator for the National Nuclear Security Administration (NNSA) and serves as the Deputy

422

Administration and Support Staff | Environmental Sciences | BNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Administration and Support Staff Administration and Support Staff Nancy Warren Nancy Barci Ph. 631-344-7548 Fax 631-344-2887 barci@bnl.gov Chairman's Office Personnel/Guest/Consultant transactions Guest Information System (GIS) Administrator Proposal Preparations Website Student Coordinator Administrative Property Representative Conference Coordinator Sharon Zuhoski Sharon Zuhoski Ph. 631-344-3359 Fax 631-344-2887 zuhoski@bnl.gov ASD Division Head Office Personnel Proposal Preparations Guest Information System (GIS) Administrator Seminar Schedule Subcontracts Conference Coordinator Judy Williams Judy Williams Ph. 631-344-4538 Fax 631-344-2887 judywms@bnl.gov Technical Property Representative Procurement/Shipping Memos Publications Petty Cash/Pay Contracts Seminar Calendar Travel Website Adrienne Jerry Adrienne Jerry

423

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Bonneville Power Administration Categorical Exclusion Determinations: Bonneville Power Administration Categorical Exclusion Determinations issued by Bonneville Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration August 26, 2013 CX-010720: Categorical Exclusion Determination Monroe-Custer #2 Access Roads CX(s) Applied: B1.3

424

Categorical Exclusion Determinations: Southwestern Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

Southwestern Power Southwestern Power Administration Categorical Exclusion Determinations: Southwestern Power Administration Categorical Exclusion Determinations issued by Southwestern Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD August 6, 2013 CX-010879: Categorical Exclusion Determination Transmission Line 3005, Structure 290 Replacement CX(s) Applied: B4.6 Date: 08/06/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration July 25, 2013 CX-010880: Categorical Exclusion Determination Transmission Line 3016, Access Road Acquisition Project CX(s) Applied: B1.24 Date: 07/25/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration July 22, 2013 CX-010716: Categorical Exclusion Determination Short Mountain Access Road Easement Acquisition CX(s) Applied: B1.24

425

Administrative Records Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. SCHEDULE TITLE DATE LAST CHANGED AUTHORIZATION NUMBER 1 Personnel Records (pdf) 09/15/10 N1-434-98-4 2 Payroll & Pay Administration Records (pdf) 09/15/10 N1-434-98-5 3 Procurement, Supply, and Grant Records (pdf) 09/15/10 N1-434-98-6 N1-434-95-1 4 Property Disposal Records (pdf) 12/10/10 --- 5 Budget Preparation, Presentation and Apportionment Records (pdf) 12/10/10 N1-434-98-8 6 Accountable Officers' Accounts Records (pdf) 09/15/10 N1-434-98-9 7 Expenditure Accounting Records --- GRS 7 8 Stores, Plants and Cost Accounting Records --- GRS 8

426

EIA Electric Power Forms  

Gasoline and Diesel Fuel Update (EIA)

Electric Power Forms Electric Power Forms EIA Electric Power Forms Listing of Publicly Available and Confidential Data EIA's statistical surveys encompass each significant electric supply and demand activity in the United States. Most of the electric power survey forms resulting data elements are published, but respondent confidentiality is required. The chart below shows the data elements for each survey form and how each data element is treated in regard to confidentiality. Data Categories Data collection forms EIA- 411 EIA- 826 EIA- 860 EIA- 860M EIA- 861 EIA- 923 Frame Information Utility identification and iocation -- -- -- -- X -- Plant identification and iocation -- -- -- X -- X Generation and fuel Latitude and longitude -- -- X -- -- --

427

Exercise Evaluation Forms  

Broader source: Energy.gov (indexed) [DOE]

Hazardous Materials Hazardous Materials Exercise Evaluation Forms Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-09.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Hazar Hazar Hazar Hazar Hazardous Materials dous Materials dous Materials dous Materials dous Materials Ex Ex Ex Ex Exer er er er ercise Ev cise Ev cise Ev cise Ev cise Evaluation Forms aluation Forms aluation Forms aluation Forms aluation Forms Objective 1: Initial Notification of Response Agencies and Response Personnel ........................................................ 3 Objective 2: Direction and Control .............................................................. 5 Objective 3: Incident Assessment ................................................................ 6

428

Energy Information Administration survey of national oil and gas reserves  

SciTech Connect (OSTI)

A description is given of the reserves estimation program of the Energy Information Administration (EIA). EIA sends survey forms to the top 500 operators in the United States and to about 750 small operators who account for significant amounts of production within selected states. An 8% random sample is taken of the remaining small operators. Data are presented which compare the findings of EIA with those of the American Petroleum Institute and the American Gas Association for 1977, 1978, and 1979. 21 figures. (JMT)

Boyd, E.R.

1981-06-01T23:59:59.000Z

429

FOIA Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

You are here: DOEID Home > FOIA > FOIA Request Form You are here: DOEID Home > FOIA > FOIA Request Form U.S. Department of Energy Idaho (DOE-ID) Operations Office Electronic FOIA Request Form* To make an Electronic FOIA (E-FOIA) request, please provide the information below. Failure to enter accurate and complete information may render your FOIA request impossible to fulfill. For individuals making a request for personal records under FOIA or the Privacy Act, please fill out the Privacy Act Request Form ( This link opens an 14 kb size Adobe Acrobat File 15 kb), print out the form and have your identity validated by having the form notarized and send the form to DOE-Idaho Privacy Officer, 1955 Freemont Avenue, Mail Stop 1203, Idaho Falls, ID 83405. * Requests submitted under the Privacy Act must be signed and, therefore, cannot be submitted on this form.

430

Introduction to differential forms  

E-Print Network [OSTI]

Dec 8, 2014 ... 6 Green's theorem for a rectangle. 8. 7 2-forms. 8. 8. Exactness in R3 and conservation of energy. 11. 9. d of a 2-form and divergence. 12.

2014-12-08T23:59:59.000Z

431

Standard Form 129  

Broader source: Energy.gov [DOE]

Form required to be filled out by companies applying to be added to the U.S. Department of Energy Qualified List of Energy Service Companies. This form must be completed and submitted with the Supplemental Questionnaire and Client Questionnaire.

432

PUBLIC ADMINISTRATION COLORADO GOLDEN FIELD OFFICE POC Karen Downs  

Broader source: Energy.gov (indexed) [DOE]

PUBLIC ADMINISTRATION PUBLIC ADMINISTRATION COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov Police Protection 922120 Administration of Education Programs 923110 International Affairs 928120 DIST OF COLUMBIA HEADQUARTERS PROCUREMENT POC Michael Raizen Telephone (202) 287-1512 Email michael.raizen@hq.doe.gov Police Protection 922120 Administration of Education Programs 923110 Administration of Human Resource Programs (except Education, Public Health, and Veterans' Affairs Programs) 923130 Administration of Air and Water Resource and Solid Waste Management Programs 924110 Administration of Urban Planning and Community and Rural Development 925120 Administration of General Economic Programs 926110 Regulation and Administration of Transportation Programs

433

ORSSAB Membership Application Form  

Broader source: Energy.gov [DOE]

Resident interested in joining the Oak Ridge Site Specific Advisory Board should complete and submit the included form.

434

Jordan Form Numerical. . .  

E-Print Network [OSTI]

Similarity Jordan Form Numerical. . . Applications Proofs Basis change A short proof Home Page, Alabama, USA Oct 3, 2007 Jordan Normal Form Revisited Speaker: Tin-Yau Tam Graduate Student Seminar tamtiny@auburn.edu #12;Similarity Jordan Form Numerical. . . Applications Proofs Basis change A short

Tam, Tin-Yau

435

THE FEDERAL ENERGY ADMINISTRATION By Roger Anders  

Broader source: Energy.gov (indexed) [DOE]

FEDERAL ENERGY FEDERAL ENERGY ADMINISTRATION By Roger Anders November 1980 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 Introduction For the three-year period between 1974 and 1977, the Federal Energy Administration implemented federal oil allocation and pricing regulations. An independent agency, the Federal Energy Administration was the successor of the Federal Energy Office, a short-term organization created to coordinate the government's response to the Arab oil embargo. By October 1977, when it became a part of the newly established Department of Energy, the Federal Energy

436

Site map | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

map | National Nuclear Security Administration map | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Site map Site map Front page Front page of National Nuclear Security Administration NNSA Site Navigation Our Mission Managing the Stockpile Stockpile Stewardship Program Quarterly Experiments Dismantlement and Disposition Weapons NPT Compliance

437

Planning for Emergencies | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

for Emergencies | National Nuclear Security Administration for Emergencies | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Planning for Emergencies Home > About Us > Our Programs > Emergency Response > Planning for Emergencies Planning for Emergencies Emergency Management is the application of the necessary resources to

438

First Responders | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Responders | National Nuclear Security Administration Responders | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration First Responders Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > First Responders First Responders NNSA's first responders include the Radiological Assistance Program (RAP)

439

Media Room | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Media Room | National Nuclear Security Administration Media Room | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Media Room Home > Media Room Media Room NNSA's Office of Congressional, Intergovernmental, and Public Affairs regularly updates the web site with current press releases, newsletters,

440

Infrastructure and Operations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Operations | National Nuclear Security Administration Operations | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Infrastructure and Operations Home > About Us > Our Operations > Infrastructure and Operations Infrastructure and Operations NNSA's missions require a secure production and laboratory infrastructure meeting immediate and long term needs. The Associate Administrator for

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Countering Nuclear Terrorism | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Countering Nuclear Terrorism | National Nuclear Security Administration Countering Nuclear Terrorism | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Countering Nuclear Terrorism Home > Our Mission > Countering Nuclear Terrorism Countering Nuclear Terrorism NNSA provides expertise, practical tools, and technically informed policy

442

Consequence Management | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Consequence Management | National Nuclear Security Administration Consequence Management | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Consequence Management Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Consequence Management Consequence Management NNSA's Consequence Management operations involve the deployment of the

443

Military Academic Collaborations | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Academic Collaborations | National Nuclear Security Administration Academic Collaborations | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Military Academic Collaborations Home > About Us > Our Programs > Defense Programs > Military Academic Collaborations Military Academic Collaborations The National Nuclear Security Administration (NNSA) Office of Defense

444

Emergency Information | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Information | National Nuclear Security Administration Information | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Emergency Information Home > Field Offices > Welcome to the Sandia Field Office > Emergency Information Emergency Information The Sandia Field Office (SFO) Emergency Management System is designed to

445

Federal Employment | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Employment | National Nuclear Security Administration Employment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Federal Employment Home > Federal Employment Federal Employment NNSA offers exciting opportunities for professionals with diverse educational backgrounds and experience. You may have a college degree in

446

Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration  

Broader source: Energy.gov (indexed) [DOE]

11, 2013 11, 2013 Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration Karen Boardman, Health Safety and Security, Director, National Training Center Wayne Elias, Fossil Energy, Director, FE-42 Gordon Fox, Office of Science, Director, SC-31.2 Mark Gilbertson, Environmental Management, DAS, Site Restoration Larry Harp, Division of Engineering and Planning, South Western Power Administration Joshua Hill, Federal Energy Regulatory Commission, Acting Director, Logistics Mgmt. Div. Doug Hooker, Energy Efficiency and Renewable Energy, Director, GO-OMA Mary McCune, Nuclear Energy, Director, Office of Facilities Management Peter O'Konski, Office of Management, Director, Office of Administration Jessica Schwersenska, Naval Reactors Laboratory Field Office, Analyst

447

Aviation Manager | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Aviation Manager | National Nuclear Security Administration Aviation Manager | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Joseph Ginanni Aviation Manager Joseph Ginanni Joseph Ginanni Role: Aviation Manager Award: U.S. General Services Administration (GSA) Federal Aviation Professional Award

448

International Programs | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Programs | National Nuclear Security Administration Programs | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration International Programs Home > About Us > Our Programs > Emergency Response > International Programs International Programs NNSA prepares for nuclear and radiological emergencies across the globe.

449

Subscribe / Unsubscribe | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Subscribe / Unsubscribe | National Nuclear Security Administration Subscribe / Unsubscribe | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Subscribe / Unsubscribe Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract >

450

Sources Sought | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Sources Sought | National Nuclear Security Administration Sources Sought | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Sources Sought Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract > Sources Sought

451

Questions and Answers | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Questions and Answers | National Nuclear Security Administration Questions and Answers | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Questions and Answers Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract >

452

Request for Proposal | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Request for Proposal | National Nuclear Security Administration Request for Proposal | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Request for Proposal Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract >

453

Reading Room | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Reading Room | National Nuclear Security Administration Reading Room | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Reading Room Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract > Reading Room

454

Congressional Testimony | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Congressional Testimony | National Nuclear Security Administration Congressional Testimony | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Congressional Testimony Home > Media Room > Congressional Testimony Congressional Testimony NNSA officials frequently testify before Congressional committees and subcommittees on matters of nuclear and national security.

455

Working with Interpreters | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Working with Interpreters | National Nuclear Security Administration Working with Interpreters | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Working with Interpreters Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and

456

Aviation Manager | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Aviation Manager | National Nuclear Security Administration Aviation Manager | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Joseph Ginanni Aviation Manager Joseph Ginanni Joseph Ginanni Role: Aviation Manager Award: U.S. General Services Administration (GSA) Federal Aviation Professional Award

457

Federal Employment | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Employment | National Nuclear Security Administration Employment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Federal Employment Home > Federal Employment Federal Employment NNSA offers exciting opportunities for professionals with diverse educational backgrounds and experience. You may have a college degree in

458

Security Forms and Information | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » New Employee Orientation » Security Forms and Services » New Employee Orientation » Security Forms and Information Security Forms and Information Homeland Security Presidential Directive HSPD-12 established new policy for a common identification standard for Federal Employees and contractors. As of October 27, 2005, all new Federal employees assigned to the DOE Headquarters complex are required to present two identity source documents (i.e., U.S. Passport, driver's license, identification card with photograph issued by a Federal, state, or local government agency, etc.), have their fingerprints taken, and undergo a background investigation (the identity proofing process) prior to reporting for duty or being issued a DOE standard badge (identity or PIV badge). Most likely, your HR representative and/or administrative personnel have

459

FAQs for Survey Form EIA-14  

Gasoline and Diesel Fuel Update (EIA)

Form EIA-14 Form EIA-14 What is the purpose of this survey? Form EIA-14, "Refiners' Monthly Cost Report" is designed to collect summary data regarding crude oil prices by Petroleum Administration for Defense Districts (PADDs). The data are used to provide the government and the public monthly prices on refiner acquisition cost of crude oil. How are my data used to publish Refiner Acquisition Cost of Crude Oil? Your data, total cost and total volume, is combined with the data of other respondents. The sum of the costs for data from all of the respondents is divided by the sum of the volumes to calculate the Refiner Acquisition Cost (RAC) of crude oil. The composite RAC is the average cost of both domestic and imported crude oil. Where can I find the published data?

460

Retirement Plaque Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Retirement Plaque Request Form Retirement Plaque Request Form Fill out a separate form for each plaque requested. Allow two weeks for delivery. If you have any questions, please call Rudy Bartolo, Retirement Plaque Coordinator at ext. 5558. FORM MUST BE SUBMITTED (mailed or faxed) in order for work to commence. Return form to Retirement Plaque Coordinator, Mailstop 77R0125, or fax 4993. Please Print Clearly Requester's Name:_______________________________ Extension:_______________ Mail Stop: ________________ Today's date:__________________ With Frame _____ Without Frame_____ Date Needed: ________________________ Full name as it is to appear on plaque:_________________________________________ Number of years employed at Lab:______________ Beginning and ending dates of employment: ____________________________________

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

NEO - Forms Checklist  

Broader source: Energy.gov (indexed) [DOE]

/4/2007; please do not use older versions /4/2007; please do not use older versions Office of Human Capital Management U.S. Department of Energy New Employee Orientation FORMS CHECKLIST EOD Date: _________________ Employee Name: ________________________ Organization: ____________________________ HR Specialist: ___________________________ Telephone Number: _______________________ Admin Contact: __________________________ Telephone Number: _______________________ New Employee Orientation Forms to be issued and collected HR Orientation Team: FORM COMPLETE & SIGNED FORM NAME AND NUMBER YES NO Comments 1. Photo ID 2. Passport; Birth Certificate; or U.S. Citizenship documentation 3. Job Offer Letter Bring on 1 st Day 4. Employment & Benefits Forms listed below

462

Methods of forming steel  

DOE Patents [OSTI]

In one aspect, the invention encompasses a method of forming a steel. A metallic glass is formed and at least a portion of the glass is converted to a crystalline steel material having a nanocrystalline scale grain size. In another aspect, the invention encompasses another method of forming a steel. A molten alloy is formed and cooled the alloy at a rate which forms a metallic glass. The metallic glass is devitrified to convert the glass to a crystalline steel material having a nanocrystalline scale grain size. In yet another aspect, the invention encompasses another method of forming a steel. A first metallic glass steel substrate is provided, and a molten alloy is formed over the first metallic glass steel substrate to heat and devitrify at least some of the underlying metallic glass of the substrate.

Branagan, Daniel J. (Iona, ID); Burch, Joseph V. (Shelley, ID)

2001-01-01T23:59:59.000Z

463

National Telecommunications and Information Administration | Open Energy  

Open Energy Info (EERE)

Telecommunications and Information Administration Telecommunications and Information Administration Jump to: navigation, search Logo: National Telecommunications and Information Administration Name National Telecommunications and Information Administration Address 1401 Constitution Avenue, N.W. Place Washington, District of Columbia Zip 20230 Phone number 202-482-2000 Website http://www.ntia.doc.gov/ Coordinates 38.893672°, -77.033665° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.893672,"lon":-77.033665,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

464

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

June 4, 2013 June 4, 2013 CX-010433: Categorical Exclusion Determination Memaloose Meadows Land Acquisition CX(s) Applied: B1.25 Date: 06/04/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010436: Categorical Exclusion Determination Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration June 3, 2013 CX-010435: Categorical Exclusion Determination De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010434: Categorical Exclusion Determination LaPine Substation Shunt Reactor Addition CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

465

Federal Aviation Administration | Open Energy Information  

Open Energy Info (EERE)

Aviation Administration Aviation Administration Jump to: navigation, search Logo: Federal Aviation Administration Name Federal Aviation Administration Address 800 Independence Ave., SW Place Washington, District of Columbia Zip 20591 Year founded 1958 Website http://www.faa.gov/ Coordinates 38.8872756°, -77.0230138° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.8872756,"lon":-77.0230138,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

466

Southeastern Power Administration | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Southeastern Power Administration Southeastern Power Administration Southeastern Power Administration Power Operations Click to view a map of SEPA power operations. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina More schedules Annual Reports December 28, 2012 Southeastern Power Administration 2012 Annual Report This report reflects our agency's programs,accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012.

467

Southwestern Power Administration (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Southwestern Power Administration (WFP) Southwestern Power Administration (WFP) Southwestern Power Administration (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy. This will enable the agency to have the right number of people with the right competencies in the right positions at the right time to successfully achieve agency's business objectives today and in the future. Southwestern Power Administration Responsible Contacts Thomas Wheeler Director, Workforce Analysis & Planning Division E-mail thomas.wheeler@hq.doe.gov Phone (202) 586-8481 More Documents & Publications Before the Subcommittee on Water and Power - House Natural Resources Committee Before the Subcommittee on Water and Power - Committee on Natural Resources Before the House Natural Resources Subcommittee on Water and Power

468

NNSA Administrator to Depart | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

to Depart to Depart NNSA Administrator to Depart January 4, 2007 - 9:59am Addthis WASHINGTON, DC - Secretary of Energy Samuel Bodman today announced the resignation of Ambassador Linton Brooks, Administrator of the National Nuclear Security Administration. Energy Secretary Samuel Bodman released the following statement today: "During my tenure at the Department, and even before, there have been a number of management issues involving the National Nuclear Security Administration, the most recent of which was a serious security breach several months ago at the Los Alamos National Laboratory. These management and security issues can have serious implications for the security of the United States. The Deputy Secretary and I repeatedly have stressed to NNSA and laboratory management the importance of these issues

469

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

July 30, 2012 July 30, 2012 CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration July 30, 2012 CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration July 27, 2012 CX-008676: Categorical Exclusion Determination Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

470

NNSA hosts governors | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

governors | National Nuclear Security Administration governors | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA hosts governors NNSA hosts governors Posted By Office of Public Affairs NNSA Administrator Tom D'Agostino and Principal Deputy Administrator Neile Miller hosted New Mexico Governor Susana Martinez, Nevada Governor

471

Administrative Order, June 13, 2000 Summary  

Broader source: Energy.gov (indexed) [DOE]

Administrative Order No. 00NWPKW-1251 Administrative Order No. 00NWPKW-1251 State Washington Agreement Type Administrative Order Legal Driver(s) RCRA Scope Summary Resolve Ecology's October 12, 1999 finding that DOE failed to complete Major TPA Milestone M-32 with respect to Double-Shell Tank (DST) integrity assessments Parties DOE; CH2M Hill Hanford Group; State of Washington Department of Ecology Date 6/13/2000 SCOPE * Require DOE and CH2M Hill Hanford Group to comply with the Revised Code of Washington, HWMA, Washington Administrative Code, the Dangerous Waste Regulations, and by reference, the CFR by taking actions which are described in this Order. * Resolve Ecology's October 12, 1999 finding that DOE failed to complete Major TPA Milestone M-32 with respect to Double-Shell Tank (DST) integrity assessments.

472

Dr. Steven Aoki | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Steven Aoki | National Nuclear Security Administration Steven Aoki | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Leadership > Dr. Steven Aoki Dr. Steven Aoki Associate Administrator and Deputy Under Secretary for Counterterrorism and Counterproliferation Dr. Steven Aoki Steven Aoki is the Associate Administrator and Deputy Under Secretary for

473

NNSA hosts governors | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

governors | National Nuclear Security Administration governors | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA hosts governors NNSA hosts governors Posted By Office of Public Affairs NNSA Administrator Tom D'Agostino and Principal Deputy Administrator Neile Miller hosted New Mexico Governor Susana Martinez, Nevada Governor

474

December 2011 | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

1 | National Nuclear Security Administration 1 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > December 2011 December 2011 NNSA Blog Holiday Message from the Administrator Posted By Thomas D'Agostino, NNSA Administrator With the holiday season upon us, I hope you will be able to spend time with the people that make your life happier and more meaningful. Whether it's

475

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

July 29, 2010 July 29, 2010 CX-003233: Categorical Exclusion Determination Purchase of Conservation Easements on Cottom and Beyeler Properties CX(s) Applied: B1.25 Date: 07/29/2010 Location(s): Lemhi County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003235: Categorical Exclusion Determination Adolfson-Feleding Property (Lavaside Property) Purchase CX(s) Applied: B1.25 Date: 07/22/2010 Location(s): Bingham County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination

476

Clarence T. Bishop | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Clarence T. Bishop | National Nuclear Security Administration Clarence T. Bishop | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Leadership > Clarence T. Bishop Clarence T. Bishop Associate Administrator for External Affairs Clarence T. Bishop Clarence T. Bishop serves as Associate Administrator for External Affairs. In this role, he is responsible for managing NNSA's Congressional

477

BROOKHAVEN EMPLOYEES' RECREATION ASSOCIATION ADMINISTRATIVE MANUAL  

E-Print Network [OSTI]

BROOKHAVEN EMPLOYEES' RECREATION ASSOCIATION (BERA) ADMINISTRATIVE MANUAL Revised September 3, 2014 of Recreational Facilities Participation Policy Participation Awards E. ADMISSION TO BERA ACTIVITIES Admission The Laboratory establishes and maintains recreation facilities on the site and encourages a varied program

478

Administrative Faculty Committee (AFC) Meeting Minutes  

E-Print Network [OSTI]

and Nick Scheib. Elections: 1) Recorder ­ Shaun called for nominations for the office of Recorder. Kathy review of the Performance Evaluation process for Administrative Faculty, especially given that merit pay

Hemmers, Oliver

479

Graduate Education Transformation Student Administrative Services  

E-Print Network [OSTI]

-friendly administrative processes ­ Leverage enterprise technology resources for efficiency and effectiveness ­ Remove, streamlining and handoff ·Engage SMEs and stakeholders for process documentation ·Manage change Registrar

Thomas, David D.

480

Management & Administration Reports | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

July 24, 2009 Audit Letter Report: OAS-L-09-15 Audit of Bonneville Power Administration Fish Hatchery Projects July 24, 2009 Audit Letter Report: OAS-L-09-14 Controls over the U.S....

Note: This page contains sample records for the topic "administration form eia-920" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EIS-0183: Bonneville Power Administration Business Plan  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration is considering how to respond to the challenges of a dynamic electric utility industry, and prepared this environmental impact statement to analyze environmental and socioeconomic impacts associated with alternatives to address this challenge.

482

Bonneville Power Administration FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

40 13 Bonneville Power Administration FOR IMMEDIATE RELEASE December 26, 2013 CONTACT: Teresa Waugh, 503-230-7536 or 503-230-5131 BPA seeks comment on draft study of proposed...

483

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 13 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Monday, July 29, 2013 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 BPA project receives innovation award for new...

484

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, March 5, 2014 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 Mainzer taps Gendron, Ehli to lead Power and...

485

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Tuesday, Jan. 27, 2014 CONTACT: Kevin Wingert, 503-230-4140971-207-8390 or 503-230-5131 Middle school teams from...

486

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Friday, Feb. 15, 2013 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 BPA launches Science Lab videos for National...

487

The National Nuclear Security Administration's Neutron Generator...  

Energy Savers [EERE]

National Nuclear Security Administration's Neutron Generator Activities OAS-L-14-11 August 2014 U.S. Department of Energy Office of Inspector General Office of Audits and...

488

The Federal Energy Administration | Department of Energy  

Energy Savers [EERE]

Energy Administration - written by Roger Anders Washington, D.C.: U.S. Department of Energy, November 1980. 15 pp. FEA History.pdf More Documents & Publications A History of...

489

Energy Information Administration/Petroleum Marketing Annual  

U.S. Energy Information Administration (EIA) Indexed Site

W W 32.9 30.5 See footnotes at end of table. 440 Energy Information AdministrationPetroleum Marketing Annual 1998 Table A3. RefinerReseller Prices of Distillate and Residual...

490

Life Extension Programs | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Extension Programs B61-12 Life Extension Program Undergoes First Full-Scale Wind Tunnel Test WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) announced today...

491

Maintaining the Stockpile | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

the Stockpile B61-12 Life Extension Program Undergoes First Full-Scale Wind Tunnel Test WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) announced today...

492

Forensics For System Administrators Sean Peisert  

E-Print Network [OSTI]

Forensics For System Administrators Sean Peisert peisert@sdsc.edu August, 2005 1 Introduction process accounting. All current security patches had been c 2005 Sean Peisert Reprinted from ;login: The

Peisert, Sean

493

Bonneville Power Administration Program Specific Recovery Plan...  

Energy Savers [EERE]

Power Administration Program Specific Recovery Plan Microsoft Word - PSRP May 15 2009 BPA Final.docx More Documents & Publications Microsoft Word - PSRP Updates 6-25-10v2...

494

Arizona Administrative Code | Open Energy Information  

Open Energy Info (EERE)

Code Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Arizona Administrative CodeLegal Abstract This website is the table of...

495

Fermilab | Graphic Standards at Fermilab | Administrative relationship...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Administrative relationships: Fermilab, DOE and FRA LLC PDF Version Fermilab is managed by Fermi Research Alliance, LLC for the U.S. Department of Energy, and whenever possible and...

496

ADMINISTRATION AND FINANCE POLICIES AND PROCEDURES  

E-Print Network [OSTI]

ADMINISTRATION AND FINANCE POLICIES AND PROCEDURES Chapter 23 LEGAL PROCEDURES Approved by President: 9/3/03 23-1 TABLE OF CONTENTS 23.01 OVERVIEW.............................................................................................................................2 23.01.1 CURRENT POLICY

Rusu, Adrian

497

EIS-0076: Bonneville Power Administration Alumax  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) developed this EIS for the proposed Alumax primary aluminum reduction plant to determine the environmental, economic and social impacts of plant construction, as well as potential power supply alternatives for BPA.

498

Don Nichols | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Don Nichols | National Nuclear Security Administration Don Nichols | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Leadership > Don Nichols Don Nichols Associate Administrator for Safety and Health Don Nichols On March 4, 2009, Dr. Nichols was appointed the Chief of Defense Nuclear Safety (CDNS), reporting to the Administrator of the National Nuclear

499

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

March 10, 2011 March 10, 2011 CX-005419: Categorical Exclusion Determination Ostrander Line Swap CX(s) Applied: B4.11 Date: 03/10/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration March 7, 2011 CX-005418: Categorical Exclusion Determination Birch Creek Radio Tower CX(s) Applied: B4.6 Date: 03/07/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 3, 2011 CX-005411: Categorical Exclusion Determination Troutdale Substation Control House CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Troutdale, Oregon Office(s): Bonneville Power Administration

500

Western Area Power Administration (Arizona) | Open Energy Information  

Open Energy Info (EERE)

Arizona) Arizona) Jump to: navigation, search Name Western Area Power Administration Place Arizona Utility Id 27000 References EIA Form EIA-861 Final Data File for 2010 - File2_2010[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Energy and Capacity Components of Firm Electric Service Industrial Firm Transmission Service of Salt Lake City Area Integrated Projects Power Commercial Long-Term Firm Point-to-Point Transmission Service Commercial Nonfirm Transmission Service Commercial Short-Term Firm Point-to-Point Transmission Service Commercial Average Rates Commercial: $0.0175/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File2_2010"