Powered by Deep Web Technologies
Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Adjustable Speed Drive: Harmonic Effects on Induction Motors: Volumes 1 and 2  

Science Conference Proceedings (OSTI)

The use of adjustable speed drives (ASDs) for induction motors in electric power plants has several advantages, but ASDs produce harmonic current and voltage that can result in problems. The Standstill Frequency Response (RFR) program for the personal PC can be used to study these harmonic effects in a wide range of motors.

1995-11-08T23:59:59.000Z

2

Adjustable Speed Drive: Harmonic Effects on Induction Motors: Volumes 1 and 2  

Science Conference Proceedings (OSTI)

The use of adjustable speed drives (ASDs) for induction motors in electric power plants has several advantages, but ASDs produce harmonic current and voltage that can result in problems. The Standstill Frequency Response (RFR) program for the personal PC can be used to study these harmonic effects in a wide range of motors.

1995-11-09T23:59:59.000Z

3

Table 1d. Residential Weather-Adjusted Primary Energy Consumption ...  

U.S. Energy Information Administration (EIA)

75. 67. 53. 93. 92. 79. 75. 70. 99. 48. Single-Family Detached. 1,894. 1,761. 1,869. 1,618. 1,863. 1,962. 2,180. 2,014. 2,177. 1,913. 2,307. Single-Family Attached ...

4

Tropospheric Adjustment Induces a Cloud Component in CO2 Forcing  

Science Conference Proceedings (OSTI)

The radiative forcing of CO2 and the climate feedback parameter are evaluated in several climate models with slab oceans by regressing the annual-mean global-mean top-of-atmosphere radiative flux against the annual-mean global-mean surface air ...

Jonathan Gregory; Mark Webb

2008-01-01T23:59:59.000Z

5

Property:OpenEI/UtilityRate/EnergyRateStructure/Tier2Adjustment | Open  

Open Energy Info (EERE)

Tier2Adjustment" Tier2Adjustment" Showing 25 pages using this property. (previous 25) (next 25) 0 0026b4d3-dd02-4423-95e1-56430d887b28 + 0.026 + 0026b4d3-dd02-4423-95e1-56430d887b28 + 0.026 + 005281e3-d52e-42dd-a84d-855a96e7e0e9 + 0.0212 + 005281e3-d52e-42dd-a84d-855a96e7e0e9 + 0.0212 + 007f7b1f-0cba-450c-9023-df962aa387a4 + 0.0133 + 007f7b1f-0cba-450c-9023-df962aa387a4 + 0.0133 + 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.0794 + 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.0794 + 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.0794 + 019e4d28-ad53-4561-8339-bc94b8f9da6c + 0.0162 + 019e4d28-ad53-4561-8339-bc94b8f9da6c + 0.0162 +, 0.0162 + 019e4d28-ad53-4561-8339-bc94b8f9da6c + 0.0162 + 01bb7be0-ae81-499d-a24f-04532333b340 + 0.0305 + 01bb7be0-ae81-499d-a24f-04532333b340 + 0.0305 +

6

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Oct '99 to Nov '99: +0.1% Oct '99 to Nov '99: +0.1% Nov '98 to Nov '99: +5.5% YTD '98 to YTD '99: +4.5% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: -0.7% Nov '98 to Nov '99: +1.7% YTD '98 to YTD '99: +1.1% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: +2.5% Nov '98 to Nov '99: +6.0% YTD '98 to YTD '99: +0.8% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: +9.7% Nov '98 to Nov '99: +2.2% YTD '98 to YTD '99: +6.2%

7

BEAMLINE 2-1  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 CURRENT STATUS: Open SUPPORTED TECHNIQUES: Powder diffraction Thin film diffraction MAIN SCIENTIFIC DISCIPLINES: Materials / Environmental % TIME GENERAL USE: 100% SCHEDULING: Proposal Submittal and Scheduling Procedures Current SPEAR and Beam Line Schedules SOURCE: 1.3 Tesla Bend Magnet BEAM LINE SPECIFICATIONS: energy range resolution DE/E spot size flux angular acceptance focused 4000-14500 eV ~5 x 10-4 .20 x 0.45 mm 1.5 mrad OPTICS: Bent cylinder, single-crystal Si, Rh-coated mirror Radii: 2900 m (adjustable) x 52 mm Mean angle of incidence: 4.2 milliradians Cut off energy: 14.5 keV, Magnification: 1.1 MONOCHROMATOR: Si(111), Si(220) Si(400), upward reflecting, double-crystal Monochromator Crystal Glitch Library Crystal changes need to be scheduled and coordinated in advance with BL

8

Adjusted Growth Rates* Jan.  

U.S. Energy Information Administration (EIA) Indexed Site

Adjusted Adjusted Growth Rates* Jan. '99 to Feb. '99: -1.7% Feb. '98 to Feb. '99: +19.8% YTD '98 to YTD '99: +15.0% U.S. Distillate Fuel Sales 3,000 3,500 4,000 4,500 5,000 5,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -7.4% Jan '99 to Jan '00: -0.1% YTD '99 to YTD '00: -0.1% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -16.8% Jan '99 to Jan '00: -3.2% YTD '99 to YTD '00: -3.2% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -9.3% Jan '99 to Jan '00: +3.5% YTD '99 to YTD '00: +3.5% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul

9

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Sep '99 to Oct '99: +3.9% Sep '99 to Oct '99: +3.9% Oct '98 to Oct '99: +2.3% YTD '98 to YTD '99: +4.4% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -0.2% Oct '98 to Oct '99: -0.9% YTD '98 to YTD '99: +1.0% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -1.9% Oct '98 to Oct '99: -0.7% YTD '98 to YTD '99: +0.4% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -2.1% Oct '98 to Oct '99: -6.4% YTD '98 to YTD '99: +6.6%

10

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

June '99 to July '99: -5.4% June '99 to July '99: -5.4% July '98 to July '99: +3.3% YTD '98 to YTD '99: +6.3% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: -0.5% July '98 to July '99: -0.4% YTD '98 to YTD '99: +1.1% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: +0.5% July '98 to July '99: +1.0% YTD '98 to YTD '99: -0.3% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: +1.5% July '98 to July '99: +10.2% YTD '98 to YTD '99: +7.2%

11

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Aug '99 to Sep '99: +4.9% Aug '99 to Sep '99: +4.9% Sep '98 to Sep '99: +4.7% YTD '98 to YTD '99: +4.7% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: -2.4% Sep '98 to Sep '99: +0.4% YTD '98 to YTD '99: +1.3% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: -2.1% Sep '98 to Sep '99: +4.6% YTD '98 to YTD '99: 0.0% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: +7.3% Sep '98 to Sep '99: +8.4% YTD '98 to YTD '99: +8.3%

12

Table 1b. U.S. Commercial Buildings Weather-Adjusted Site Energy ...  

U.S. Energy Information Administration (EIA)

U.S. Commercial Buildings Weather-Adjusted Site Energy. Released Date: December 2004 ... 3 Laboratory buildings are included in the "Other" category.

13

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Nov '99 to Dec '99: +5.3% Nov '99 to Dec '99: +5.3% Dec '98 to Dec '99: +8.7% YTD '98 to YTD '99: +5.0% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +6.0% Dec '98 to Dec '99: +4.5% YTD '98 to YTD '99: +1.3% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +2.4% Dec '98 to Dec '99: +3.0% YTD '98 to YTD '99: +0.9% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +32.3% Dec '98 to Dec '99: +2.0% YTD '98 to YTD '99: +5.5%

14

Sub-0.1 nm-resolution quantitative scanning transmission electron microscopy without adjustable parameters  

Science Conference Proceedings (OSTI)

Atomic-resolution imaging in the scanning transmission electron microscope (STEM) constitutes a powerful tool for nanostructure characterization. Here, we demonstrate the quantitative interpretation of atomic-resolution high-angle annular dark-field (ADF) STEM images using an approach that does not rely on adjustable parameters. We measure independently the instrumental parameters that affect sub-0.1 nm-resolution ADF images, quantify their individual and collective contributions to the image intensity, and show that knowledge of these parameters enables a quantitative interpretation of the absolute intensity and contrast across all accessible spatial frequencies. The analysis also provides a method for the in-situ measurement of the STEM's effective source distribution.

Dwyer, C. [Monash Centre for Electron Microscopy, Monash University, Victoria 3800 (Australia); Department of Materials Engineering, Monash University, Victoria 3800 (Australia); ARC Centre of Excellence for Design in Light Metals, Monash University, Victoria 3800 (Australia); Maunders, C. [Department of Materials Engineering, Monash University, Victoria 3800 (Australia); Zheng, C. L. [Monash Centre for Electron Microscopy, Monash University, Victoria 3800 (Australia); Weyland, M.; Etheridge, J. [Monash Centre for Electron Microscopy, Monash University, Victoria 3800 (Australia); Department of Materials Engineering, Monash University, Victoria 3800 (Australia); Tiemeijer, P. C. [FEI Electron Optics, P.O. Box 80066, 5600 KA Eindhoven (Netherlands)

2012-05-07T23:59:59.000Z

15

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

July '99 to Aug. '99: +4.7% July '99 to Aug. '99: +4.7% Aug. '98 to Aug. '99: +1.3% YTD '98 to YTD '99: +4.7% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: -1.9% Aug. '98 to Aug. '99: -0.4% YTD '98 to YTD '99: +0.9% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: -0.1% Aug. '98 to Aug. '99: -1.4% YTD '98 to YTD '99: -0.7% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: +22.3% Aug. '98 to Aug. '99: +21.1%

16

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Jan. '99 to Feb. '99: -1.7% Feb. '98 to Feb. '99: +19.8% YTD '98 to YTD '99: +15.0% 4,100 4,400 4,700 5,000 5,300 5,600 5,900 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons U.S. Distillate Fuel Sales 2011 2012 2013 Adjusted Growth Rates* Jul '13 to Aug '13: 2.5% Aug '12 to Aug '13: -1.3% YTD '12 to YTD '13: 1.5% 300 400 500 600 700 800 900 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons U.S. Residual Fuel Sales 2011 2012 2013 Adjusted Growth Rates* Jul '13 to Aug '13: -0.8%

17

Estuarine Adjustment  

Science Conference Proceedings (OSTI)

Subtidal adjustment of estuarine salinity and circulation to changing river flow or tidal mixing is explored using a simplified numerical model. The model employs tidally averaged, width-averaged physics, following Hansen and Rattray, extended to ...

Parker MacCready

2007-08-01T23:59:59.000Z

18

(1) Ensemble forecast calibration & (2) using reforecasts  

E-Print Network (OSTI)

1 (1) Ensemble forecast calibration & (2) using reforecasts Tom Hamill NOAA Earth System Research · Calibration: ; the statistical adjustment of the (ensemble) forecast ­ Rationale 1: Infer large-sample probabilities from small ensemble. ­ Rationale 2: Remove bias, increase forecast reliability while preserving

Hamill, Tom

19

Utah Coalbed Methane Proved Reserves Adjustments (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet) Utah Coalbed Methane Proved Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

20

Utah Natural Gas, Wet After Lease Separation Reserves Adjustments...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet) Utah Natural Gas, Wet After Lease Separation Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Utah Natural Gas Liquids Lease Condensate, Proved Reserves Adjustments...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Million Barrels) Utah Natural Gas Liquids Lease Condensate, Proved Reserves Adjustments (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

22

Utah Dry Natural Gas Reserves Adjustments (Billion Cubic Feet...  

Annual Energy Outlook 2012 (EIA)

Adjustments (Billion Cubic Feet) Utah Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1970's...

23

Utah Crude Oil + Lease Condensate Reserves Adjustments (Million...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Million Barrels) Utah Crude Oil + Lease Condensate Reserves Adjustments (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

24

Miscellaneous States Shale Gas Proved Reserves Adjustments (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet) Miscellaneous States Shale Gas Proved Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

25

California Dry Natural Gas Reserves Adjustments (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Adjustments (Billion Cubic Feet) California Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

26

Ohio Dry Natural Gas Reserves Adjustments (Billion Cubic Feet...  

Annual Energy Outlook 2012 (EIA)

Adjustments (Billion Cubic Feet) Ohio Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1970's...

27

U.S. Natural Gas Plant Liquids, Reserves Adjustments (Million...  

Annual Energy Outlook 2012 (EIA)

Adjustments (Million Barrels) U.S. Natural Gas Plant Liquids, Reserves Adjustments (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

28

Michigan Dry Natural Gas Reserves Adjustments (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet) Michigan Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

29

U.S. Coalbed Methane Proved Reserves Adjustments (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Adjustments (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

30

Colorado Dry Natural Gas Reserves Adjustments (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet) Colorado Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

31

U.S. Crude Oil + Lease Condensate Reserves Adjustments (Million...  

Annual Energy Outlook 2012 (EIA)

Adjustments (Million Barrels) U.S. Crude Oil + Lease Condensate Reserves Adjustments (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

32

New Mexico Dry Natural Gas Reserves Adjustments (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Adjustments (Billion Cubic Feet) New Mexico Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

33

New Mexico - East Dry Natural Gas Reserves Adjustments (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet) New Mexico - East Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

34

New Mexico - West Dry Natural Gas Reserves Adjustments (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet) New Mexico - West Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

35

Texas Dry Natural Gas Reserves Adjustments (Billion Cubic Feet...  

Gasoline and Diesel Fuel Update (EIA)

Adjustments (Billion Cubic Feet) Texas Dry Natural Gas Reserves Adjustments (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's...

36

Midwest (PADD 2) Adjusted Sales of Distillate Fuel Oil by End Use  

U.S. Energy Information Administration (EIA)

Railroad: 1,717,322: 1,508,136: 1,303,015: 1,508,545: 1,375,270: 1,403,064: 1984-2012: Vessel Bunkering: 425,297: 455,194: 438,978: 457,034: 440,679: ...

37

Stable single-photon interference in a 1 km fiber-optical Mach-Zehnder interferometer with continuous phase adjustment  

E-Print Network (OSTI)

We experimentally demonstrate stable and user-adjustable single-photon interference in a 1 km long fiber- optical Mach-Zehnder interferometer, using an active phase control system with the feedback provided by a classical laser. We are able to continuously tune the single-photon phase difference between the interferometer arms using a phase modulator, which is synchronized with the gate window of the single-photon detectors. The phase control system employs a piezoelectric fiber stretcher to stabilize the phase drift in the interferometer. A single-photon net visibility of 0.97 is obtained, yielding future possibilities for experimental realizations of quantum repeaters in optical fibers, and violation of Bell's inequalities using genuine energy-time entanglement

Xavier, G B

2011-01-01T23:59:59.000Z

38

Stable single-photon interference in a 1 km fiber-optical Mach-Zehnder interferometer with continuous phase adjustment  

E-Print Network (OSTI)

We experimentally demonstrate stable and user-adjustable single-photon interference in a 1 km long fiber- optical Mach-Zehnder interferometer, using an active phase control system with the feedback provided by a classical laser. We are able to continuously tune the single-photon phase difference between the interferometer arms using a phase modulator, which is synchronized with the gate window of the single-photon detectors. The phase control system employs a piezoelectric fiber stretcher to stabilize the phase drift in the interferometer. A single-photon net visibility of 0.97 is obtained, yielding future possibilities for experimental realizations of quantum repeaters in optical fibers, and violation of Bell's inequalities using genuine energy-time entanglement

G. B. Xavier; J. P. von der Weid

2011-04-14T23:59:59.000Z

39

GRAV2D: an interactive 2-1/2 dimensional gravity modeling program (user's guide and documentation for Rev. 1)  

DOE Green Energy (OSTI)

GRAV2D is an interactive computer program used for modeling 2-1/2 dimensional gravity data. A forward algorithm is used to give the theoretical attraction of gravity intensity at a station due to a perturbing body given by the initial model. The resultant model can then be adjusted for a better fit by a combination of manual adjustment, one-dimensional automatic search, and Marquardt inversion. GRAV2D has an interactive data management system for data manipulation and display built around subroutines to do a forward problem, a one-dimensional direct search and an inversion. This is a user's guide and documentation for GRAV2D.

Nutter, C.

1980-11-01T23:59:59.000Z

40

Tape 2, Side 1  

E-Print Network (OSTI)

Suri Kamara 270 323 1/2 29/12/61 Story of two women Suri Kamara 323 270 10/1 1964 Jan to Feb (not in...

Finnegan, Ruth

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Tape 1, Side 2  

E-Print Network (OSTI)

Suri Kamara 270 323 1/2 29/12/61 Story of two women Suri Kamara 323 270 10/1 1964 Jan to Feb (not in...

Finnegan, Ruth

42

MAG2D: Interactive 2-1/2-dimensional magnetic modeling program (User's Guide and Documentation for Rev. 1)  

DOE Green Energy (OSTI)

MAG2D is an interactive computer program used for modeling 2-1/2-dimensional magnetic data. A forward algorithm is used to give the theoretical attraction of magnetic intensity at a station due to a perturbing body given by the initial model. The resultant model can then be adjusted for a better fit by a combination of manual adjustment, one-dimensional automatic search, and Marquardt inversion. MAG2D has an interactive data management system for data manipulation and display built around subroutines to do a forward problem, a one-dimensional direct search and an inversion. These subroutines were originally separate batch-mode programs.

Nutter, C.

1981-04-01T23:59:59.000Z

43

Page 1 of2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 of2 The DOE Executive Salary Approval parameters contained in AL2000-12 are hereby reinstated pending final issuance of revised DOE Order 350.1 X, Contractor Human Resources...

44

Phase 1 -- 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Revised 8/7/02 " "Sample Statement of Work - Standard Service Offerings for Contractor-Identified Project" "Task #","Task Title","Work Scope","Deliverable","Agency Requirements" " " "Phase Two - Initial Project Development" "2-1","DO RFP Development - Direct Support","Based upon interviews Agency/site staff and consultation support, FEMP Services will prepare DO RFP for Agency/site. FEMP Services will provide onsite or telecon review of draft DO RFP with agency staff. FEMP Services will prepare 2nd draft DO RFP based on telecon and written agency review comments and recommendations. ","Draft DO RFP Document. On-site review of draft DO RFP.

45

Phase 1 --2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Rev 4-01-05 " "Statement of Work - Standard Service Offerings for Contractor-Identified Project at (insert project site)" "Task #","Task Title","Work Scope","Deliverable","Agency Requirements" " " "Phase Two - Initial Project Development" "2-1","DO RFP Development - Direct Support","Based upon interviews Agency/site staff and consultation support, FEMP Services will prepare DO RFP for Agency/site. FEMP Services will provide onsite or telecon review of draft DO RFP with agency staff. FEMP Services will prepare 2nd draft DO RFP based on telecon and written agency review comments and recommendations. ","Draft DO RFP Document. On-site review of draft DO RFP.

46

Adjusted Estimates of Texas Natural Gas Production  

U.S. Energy Information Administration (EIA) Indexed Site

1 Energy Information Administration 1 Energy Information Administration Adjusted Estimates of Texas Natural Gas Production Background The Energy Information Administration (EIA) is adjusting its estimates of natural gas production in Texas for 2004 and 2005 to correctly account for carbon dioxide (CO 2 ) production. Normally, EIA would wait until publication of the Natural Gas Annual (NGA) before revising the 2004 data, but the adjustments for CO 2 are large enough to warrant making the changes at this time. Prior to 2005, EIA relied exclusively on the voluntary sharing of production data by state and federal government entities to develop its natural gas production estimates. In 2005, EIA began collecting production data directly from operators on the new EIA-914 production

47

Page 1 of 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ Page 1 of 2 1) This memorandum provides reminders on the proper use of non-DOE contracting vehicles. including Economy Act transactions. Government-wide Acquisition Contracts. and Federal Supply Schedules. The recent discovery of improper use of such contracting vehicles has led to investigations ,:>f procurement activities at the General Services Administration and Department of Defense. Contracting Officers are cautioned to be diligent in the use of other agencies' contracting vehicles. 2) This memorandwn provides an overview of a Biobased Products Procurement Preference Program being developed as a result of the F8ml Security and Rural Development Act of 2002 and a recent rulemaking issued by the U.S. Department of Agriculture. It will highlight

48

Metric adjusted skew information  

E-Print Network (OSTI)

We extend the concept of Wigner-Yanase-Dyson skew information to something we call ``metric adjusted skew information'' (of a state with respect to a conserved observable). This ``skew information'' is intended to be a non-negative quantity bounded by the variance (of an observable in a state) that vanishes for observables commuting with the state. We show that the skew information is a convex function on the manifold of states. It also satisfies other requirements, proposed by Wigner and Yanase, for an effective measure-of-information content of a state relative to a conserved observable. We establish a connection between the geometrical formulation of quantum statistics as proposed by Chentsov and Morozova and measures of quantum information as introduced by Wigner and Yanase and extended in this article. We show that the set of normalized Morozova-Chentsov functions describing the possible quantum statistics is a Bauer simplex and determine its extreme points. We determine a particularly simple skew information, the ``lambda-skew information,'' parametrized by a lambda in (0,1], and show that the convex cone this family generates coincides with the set of all metric adjusted skew informations. Key words: Skew information, convexity, monotone metric, Morozova-Chentsov function, lambda-skew information.

Frank Hansen

2006-07-23T23:59:59.000Z

49

MAG2D: Interactive 2-1/2-dimensional magnetic modeling program (User's Guide and Documentation for Rev. 1)  

SciTech Connect

MAG2D is an interactive computer program used for modeling 2-1/2-dimensional magnetic data. A forward algorithm is used to give the theoretical attraction of magnetic intensity at a station due to a perturbing body given by the initial model. The resultant model can then be adjusted for a better fit by a combination of manual adjustment, one-dimensional automatic search, and Marquardt inversion. MAG2D has an interactive data management system for data manipulation and display built around subroutines to do a forward problem, a one-dimensional direct search and an inversion. These subroutines were originally separate batch-mode programs.

Nutter, C.

1981-04-01T23:59:59.000Z

50

Data:54482a1f-08c6-469e-a375-7615c2a3d7c2 | Open Energy Information  

Open Energy Info (EERE)

482a1f-08c6-469e-a375-7615c2a3d7c2 482a1f-08c6-469e-a375-7615c2a3d7c2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting HPS 100 W Underground (Includes Pole) Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability

51

On L 1 L 2 ???M 2  

Science Conference Proceedings (OSTI)

The well-known inequality L 1 L 2 ???M 2 connecting the coefficients of self- and mutual inductances for a pair of coupled circuits is derived by analytical methods

Edwin A. Power

1969-01-01T23:59:59.000Z

52

Adjusted Growth Rates*  

Annual Energy Outlook 2012 (EIA)

Aug '99 to Sep '99: -2.1% Sep '98 to Sep '99: +4.6% YTD '98 to YTD '99: 0.0% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct...

53

Page 1 of 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FLASH 2004-02 FLASH 2004-02 February 11, 2004 As discussed in Policy Flash 2003-05, the BPN, an element under the Integrated Acquisition Environment (IAE) 'which is part of the e-government initiative, is a grouping of systems that track vendor data. ()nline Representations and Certifications (ORCA) is another application to the BPN, similar to 1:he Central Contractor Registration (CCR), and the Federal Procurement Data System-Next Cieneration (FPDS-NG). This electronic application replaces the paper based Representations and Certifications (reps. and certs.) process. Also, ORCA is desi;~ed to eliminate the administrative burden on contractors who are required to provide reps. and certs. infonnation to various contracting offices as many times as an otTer is submitted. The use1ulness of the Online Representations and Certifications allows Federal

54

Page 1 of 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The purpose of this memorandum is to revise the discretionary set-aside authority addressed on The purpose of this memorandum is to revise the discretionary set-aside authority addressed on Page 13 of Acquisition Letter 2004-03 from SSO,(XX) to SIOO,(XX). Questions may be addressed to Steve Zvolensky at (202) 287-1307 or St~hen.zvolensk~@hg.doe.£ov Attachment cc: PP AG Members ;k..t ./ /!k~ --'"' Michael P. Fischetti Acting Director Office of Procurement and Assistance Policy Michael Acting I Office 0 Page 2 of 2 MEMORANDUM FOR DISTRIBUTION 6tfJ FROM: RICHARD H. HOPF, DIRECT~ OFFICE OF PROCUREMENT AND ASSIST ANCE ~ Discretionary Set-Aside A:tho} SUBJECT: The purpose of this memorandum is to revise the discretionary set-aside authority addressed on Page 13 of Acquisition Letter 2004-03 from $50,000 to $100,000. The paragraph entitled, Discretionary Set-Asides, is revised to read:

55

Page 1 of2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

new product, the E-DEAR, is packaged as a single file in Microsoft Wordc fontlat and is new product, the E-DEAR, is packaged as a single file in Microsoft Wordc fontlat and is fontlatted to be word processor friendly. It is "searchable" in the "edit/find" sense but lacks any sophisticated search al1d list capability. The E-DEAR has bookmarks for each Part, and in Part 970, bookmarks exist for each subpart. After opening the file in WordC, you access the bookmarks by selectmg "insert," then "bookmark." Select the part or subpart you wish to access from the drop down menu and click the "Go To" icon. We have retained the current "read by Subpart" capability and added a link to the Hill AFB FarSite. Also a librar)' of final rules which amended the DEAR is also available. These tools

56

Page 1 of 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"benchmark compensation amount" is to be used for contractor FY 2004 and subsequent "benchmark compensation amount" is to be used for contractor FY 2004 and subsequent contractor FY s unless and until revised by OFFP. This benchmark compensation amount applies to contract costs incurred after January 1,2004, under covered contracts of both defense and civilian procurement agencies, as specified in Section 808 of Pub. L.I05-85. This "benchmark compensation amount" supersedes the amount cited in Headquarters Policy Flash 2003-19, August 26,2003. Applicability of the FAR to M&O contracts is addressed at 48 CFR 31.205-6(p) and 48CFR 970.3102-O5-6(p), respectively. For questions related to this Flash, contact Terry Sheppard at (202) 586-8193 or via e-mail at terrv.sheQoard@hg.doe.gov Attachment Cc: PP AG Members FLASH 2004.16

57

MPX V1.2  

Energy Science and Technology Software Center (OSTI)

002209WKSTN00 Hardware Counter Multiplexing V1.2 https://computation.llnl.gov/casc/mpx/mpx.home.html

58

Adjusted Growth Rates*  

Annual Energy Outlook 2012 (EIA)

Oct '99 to Nov '99: +2.5% Nov '98 to Nov '99: +6.0% YTD '98 to YTD '99: +0.8% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct...

59

Adjusted Growth Rates*  

Annual Energy Outlook 2012 (EIA)

Nov '99 to Dec '99: +2.4% Dec '98 to Dec '99: +3.0% YTD '98 to YTD '99: +0.9% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct...

60

Nonlinear Midlatitude Ocean Adjustment  

Science Conference Proceedings (OSTI)

Ocean adjustment on annual to interdecadal scales to variable forcing is considered for a more nonlinear general circulation than has previously been studied. The nature of the response is a strong function of forcing frequency and importantly ...

William K. Dewar

2003-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Hydrostatic Adjustment: Lamb's Problem  

Science Conference Proceedings (OSTI)

The prototype problem of hydrostatic adjustment for large-scale atmospheric motions is Presented. When a horizontally infinite layer of compressible fluid, initially at rest, is instantaneously heated, the fluid is no longer in hydrostatic ...

Peter R. Bannon

1995-05-01T23:59:59.000Z

62

table1.2_02  

U.S. Energy Information Administration (EIA) Indexed Site

2 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; 2 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS Codes; Column: Energy Sources and Shipments; Unit: Trillion Btu. Shipments RSE NAICS Net Residual Distillate Natural LPG and Coke and of Energy Sources Row Code(a) Subsector and Industry Total(b) Electricity(c) Fuel Oil Fuel Oil(d) Gas(e) NGL(f) Coal Breeze Other(g) Produced Onsite(h) Factors Total United States RSE Column Factors: 0.9 1 1.2 1.8 1 1.6 0.8 0.9 1.2 0.4 311 Food 1,123 230 13 19 582 5 184 1 89 0 6.8 311221 Wet Corn Milling 217 23 * * 61 * 121 0 11 0 1.1 31131 Sugar 112 2 2 1 22 * 37 1 46 0 0.9 311421 Fruit and Vegetable Canning 47 7 1 1 36 Q 0 0 1 0 11 312 Beverage and Tobacco Products 105 26 2 2 46 1 17 0 11

63

Spider 2, Version 2.1  

Science Conference Proceedings (OSTI)

The EPRI Spider 2, Version 2.1 software application (product ID # 1016529) allows a user to create a detailed assessment plan for evaluating the conditions of equipment, systems, processes and plans, and to make quantitative decisions based on qualitative data. Description Using basic concepts and technology developed over the years by the Electric Power Research Institute (EPRI), the Spider 2 software application provides a unique method for an organization to automate assessments of equipment, systems ...

2008-06-16T23:59:59.000Z

64

2.1E Supplement  

E-Print Network (OSTI)

GENERATOR Introduction Gas Turbine Steam Turbine SIMULATIONSModes 1: Chillers, Gas Turbine, and Boiler 2: Chillers,O R SIMULATIONS Introduction Gas Turbine Steam Turbine PLANT

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

65

Data:82d535e4-c2ee-45f2-a514-e1e2dafa8c68 | Open Energy Information  

Open Energy Info (EERE)

5e4-c2ee-45f2-a514-e1e2dafa8c68 5e4-c2ee-45f2-a514-e1e2dafa8c68 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Small Commercial, Schedule G1 Sector: Commercial Description: Available in OTEC service territory for non-residential service requiring 50 kVA or less of transformer capacity, subject to policies as established by the Board of Directors. Power cost adjustment: The power cost adjustment will follow Bonneville Power Administration's (BPA) temporary charges to OTEC as they adjust their wholesale rates up or down through BPA's Cost Recovery Adjustment Clauses (CRAC). The power cost adjustment will also include future price increases in the cogeneration power purchase contracts.

66

Nonlinear Baroclinic Adjustment  

Science Conference Proceedings (OSTI)

The concept of baroclinic adjustment is reexamined in the context of a fully nonlinear two-layer model on a ?-plane. Based on our results we propose a single, conceptually very simple mechanism of the nonlinear equilibration of waves and the mean ...

Priscilla Cehelsky; Ka Kit Tung

1991-09-01T23:59:59.000Z

67

Data:31aa5874-2f2c-4f1f-9dd2-3a3c0f4bfeec | Open Energy Information  

Open Energy Info (EERE)

874-2f2c-4f1f-9dd2-3a3c0f4bfeec 874-2f2c-4f1f-9dd2-3a3c0f4bfeec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Industrial Large General Service (250 kW - 749 kW) Sector: Industrial Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. All kvar in excess of 40% (93% power factor) of billing demand will be billed at the rate of $0.90 per kvar. Source or reference: http://www.singingriver.com/Files/LGS-15.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment

68

A self-adjusting e-course generation process for personalized learning  

Science Conference Proceedings (OSTI)

This paper proposes a self-adjusting e-course generation process, which support to provide a truly personalized learning environment. The proposed process is divided into four steps: (1) determining learning concept structure, (2) adjusting the difficulty ... Keywords: Collaborative voting approach, Evolutionary algorithms (EAs), Maximum likelihood estimation (MLE), Personalized e-course, e-Learning

Jian-Wei Li; Yi-Chun Chang; Chih-Ping Chu; Cheng-Chang Tsai

2012-02-01T23:59:59.000Z

69

Table H.1co2  

U.S. Energy Information Administration (EIA)

AC Argentina AR Aruba AA Bahamas, The BF Barbados BB Belize BH Bolivia BL ... Table H.1co2 World Carbon Dioxide Emissions from the Consumption and Flaring of Fossil ...

70

Automatic temperature adjustment apparatus  

DOE Patents (OSTI)

An apparatus for increasing the efficiency of a conventional central space heating system is disclosed. The temperature of a fluid heating medium is adjusted based on a measurement of the external temperature, and a system parameter. The system parameter is periodically modified based on a closed loop process that monitors the operation of the heating system. This closed loop process provides a heating medium temperature value that is very near the optimum for energy efficiency.

Chaplin, James E. (66 Overlook Rd., Bloomingdale, NJ 07403)

1985-01-01T23:59:59.000Z

71

1. INTRODUCTION 1.1 SABAP1 AND SABAP2  

E-Print Network (OSTI)

that have uniform habitat and limited landscape features (e.g. in the Karoo or Kalahari Coastal Belt & Little Karoo (Blue) Field Data Sheet 2 = West Coast and Succulent Karoo (Beige) Field Data was in the Karoo, but that you saw the House Sparrow only at the farm house. 2.6.5 Behaviour Use this category

de Villiers, Marienne

72

2.1E Supplement  

E-Print Network (OSTI)

o. (o. (o. (o. (o- (o. UTILITY-RATE RESOURCE = NATURAL-GAS CHG In this example, two utility rates have been defined3 / 9 2.1E- 8 1 / 3 E - UTILITY-RATE MINOR-OVHL-COST MIN-O-C

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

73

96 2 97 1 ......................................................................4  

E-Print Network (OSTI)

........................................................................ 17 6 ICDF............................................................ 17 7MediaTek Scholarship Mxic Scholarship 3 TSMC Sponsorship ICDF TIGP94 96 2 96 1 175 3 86% 2 94 96 ICDF TIGP TSMC 94 35 15 16 11 -- 77 95 59 37 23 19 -- 138 96 84 65 20 21 3 193 3 96

Huang, Haimei

74

U.S. Commercial Buildings Weather-Adjusted Site Energy  

U.S. Energy Information Administration (EIA)

Energy Efficiency > Commercial Buildings Energy Intensities > Table 1b . U.S. Commercial Buildings Weather-Adjusted Site Energy

75

Appendix: Selected Answers Section 1.2  

E-Print Network (OSTI)

Appendix: Selected Answers Chapter 1 Section 1.2 1.2.1 (a) 5/6. (b) 1. (c) 1/2. 1.2.4 No. 1.2.8 No/4. 1.6.3 limn P(An) = P(A) = P(S) = 1. 1 #12;2 APPENDIX: SELECTED ANSWERS Chapter 2 Section 2.1 2.1.1(a Negative Binomial(r + s, ) . Section 2.4 2.4.1 (a) P(U 0) = 0. (b) P(U = 1/2) = 0. (c) P(U

Rosenthal, Jeffrey S.

76

Buildings Energy Data Book: 1.2 Building Sector Expenditures  

Buildings Energy Data Book (EERE)

5 5 2010 Buildings Energy End-Use Expenditure Splits, by Fuel Type ($2010 Billion) (1) Natural Petroleum Gas Distil. Resid. LPG Oth(2) Total Coal Electricity Total Percent Space Heating (3) 53.7 14.2 0.9 8.0 0.6 23.7 0.1 23.2 100.8 23.4% Space Cooling 0.4 61.3 61.7 14.3% Lighting 59.3 59.3 13.8% Water Heating 18.3 2.6 2.0 4.6 17.8 40.7 9.4% Refrigeration (4) 26.9 26.9 6.2% Electronics (5) 26.1 26.1 6.1% Ventilation (6) 15.9 15.9 3.7% Cooking 4.0 0.8 0.8 8.8 13.6 3.2% Computers 12.1 12.1 2.8% Wet Cleaning (7) 0.6 11.0 11.6 2.7% Other (8) 2.7 0.3 7.7 1.2 9.2 27.3 39.2 9.1% Adjust to SEDS (9) 6.2 5.2 5.2 11.9 23.4 5.4% Total 86.0 22.3 0.9 18.5 1.8 43.5 0.1 301.6 431.2 100% Note(s): Source(s): 1) Expenditures include coal and exclude wood. 2) Includes kerosene space heating ($0.6 billion) and motor gasoline other uses ($1.2 billion). 3) Includes furnace fans ($4.5 billion). 4) Includes refrigerators ($24.1 billion) and freezers ($2.8 billion). 5) Includes color televisions ($11.0

77

Time-Dependent Fully Nonlinear Geostrophic Adjustment  

Science Conference Proceedings (OSTI)

Shock-capturing numerical methods are employed to integrate the fully nonlinear, rotating 1D shallow-water equations starting from steplike nongeostrophic initial conditions (a Rossby adjustment problem). Such numerical methods allow one to ...

Allen C. Kuo; Lorenzo M. Polvani

1997-08-01T23:59:59.000Z

78

Lattice QCD-2+1  

E-Print Network (OSTI)

We consider a 2+1-dimensional SU(N) lattice gauge theory in an axial gauge with the link field U in the 1-direction set to one. The term in the Hamiltonian containing the square of the electric field in the 1-direction is non-local. Despite this non-locality, we show that weak-coupling perturbation theory in this term gives a finite vacuum-energy density to second order, and suggest that this property holds to all orders. Heavy quarks are confined, the spectrum is gapped, and the space-like Wilson loop has area decay.

Peter Orland

2005-01-26T23:59:59.000Z

79

SF424_2_1-V2.1.pdf  

Gasoline and Diesel Fuel Update (EIA)

Number: 4040-0004 Number: 4040-0004 Expiration Date: 03/31/2012 * 1. Type of Submission: * 2. Type of Application: * 3. Date Received: 4. Applicant Identifier: 5a. Federal Entity Identifier: * 5b. Federal Award Identifier: 6. Date Received by State: 7. State Application Identifier: * a. Legal Name: * b. Employer/Taxpayer Identification Number (EIN/TIN): * c. Organizational DUNS: * Street1: Street2: * City: County/Parish: * State: Province: * Country: * Zip / Postal Code: Department Name: Division Name: Prefix: * First Name: Middle Name: * Last Name: Suffix: Title: Organizational Affiliation: * Telephone Number: Fax Number: * Email: * If Revision, select appropriate letter(s): * Other (Specify): State Use Only: 8. APPLICANT INFORMATION: d. Address: e. Organizational Unit: f. Name and contact information of person to be contacted on matters involving this application:

80

Buildings Energy Data Book: 1.2 Building Sector Expenditures  

Buildings Energy Data Book (EERE)

8 8 2035 Buildings Energy End-Use Expenditure Splits, by Fuel Type ($2010 Billion) (1) Natural Petroleum Gas Distil. Resid. LPG Oth(2) Total Coal Electricity Total Percent Space Heating (3) 63.4 13.0 1.6 7.7 0.8 23.1 0.2 20.6 107.2 20.9% Water Heating 23.8 2.2 1.2 3.4 35.8 63.0 12.3% Space Cooling 0.4 55.7 56.1 10.9% Lighting 47.8 47.8 9.3% Electronics (4) 27.2 27.2 5.3% Refrigeration (5) 27.0 27.0 5.3% Computers 14.8 14.8 2.9% Cooking 5.8 0.8 0.8 5.4 12.1 2.3% Wet Clean (6) 0.9 10.4 11.3 2.2% Ventilation (7) 2.4 2.4 0.5% Other (8) 9.3 0.4 12.6 2.0 15.0 88.8 113.2 22.0% Adjust to SEDS (9) 4.6 5.3 5.3 21.7 31.6 6.2% Total 108.2 21.0 1.6 22.3 2.8 47.6 0.2 357.8 513.8 100% Note(s): Source(s): 1) Expenditures include coal and exclude wood. 2) Includes kerosene space heating ($0.8 billion) and motor gasoline other uses ($2.0 billion). 3) Includes furnace fans ($4.8 billion). 4) Includes color televisions ($14.2 billion). 5) Includes refrigerators ($24.1 billion) and freezers ($3.0

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Vortex Generation Through Balanced Adjustment  

Science Conference Proceedings (OSTI)

The problem of geostrophic adjustment, originally considered by C.G. Rossby, is solved in an axisymmetric geometry for a continuously stratified fluid, where the adjusted final state is in hydrostatic, gradient-wind balance. This problem is ...

James C. McWilliams

1988-08-01T23:59:59.000Z

82

Buildings Energy Data Book: 1.2 Building Sector Expenditures  

Buildings Energy Data Book (EERE)

6 6 2015 Buildings Energy End-Use Expenditure Splits, by Fuel Type ($2010 Billion) (1) Natural Gas Distil. Resid. LPG Oth(2) Total Coal Total Percent Space Heating (3) 49.5 15.9 1.3 8.1 0.7 25.9 0.2 18.7 94.3 22.7% Space Cooling 0.3 48.0 48.3 11.6% Lighting 45.9 45.9 11.0% Water Heating 17.6 2.6 1.5 4.1 18.3 40.0 9.6% Refrigeration (4) 24.9 24.9 6.0% Electronics (5) 19.8 19.8 4.7% Ventilation (6) 15.1 15.1 3.6% Computers 11.6 11.6 2.8% Wet Cleaning (7) 0.6 10.8 11.4 2.7% Cooking 3.9 0.9 0.9 4.4 9.1 2.2% Other (8) 2.9 0.3 8.9 1.4 10.6 54.1 67.6 16.3% Adjust to SEDS (9) 5.8 4.5 4.5 17.7 28.1 6.7% Total 80.6 23.3 1.3 19.4 2.1 46.1 0.2 289.3 416.2 100% Note(s): Source(s): Petroleum Electricity 1) Expenditures include coal and exclude wood. 2) Includes kerosene space heating ($0.7 billion) and motor gasoline other uses ($1.4 billion). 3) Includes furnace fans ($4.6 billion). 4) Includes refrigerators ($22.6 billion) and freezers ($2.8 billion). 5) Includes color televisions ($10.9

83

Performance of An Adjustable Strength Permanent Magnet Quadrupole  

SciTech Connect

An adjustable strength permanent magnet quadrupole suitable for use in Next Linear Collider has been built and tested. The pole length is 42cm, aperture diameter 13mm, peak pole tip strength 1.03Tesla and peak integrated gradient * length (GL) is 68.7 Tesla. This paper describes measurements of strength, magnetic CL and field quality made using an air bearing rotating coil system. The magnetic CL stability during -20% strength adjustment proposed for beam based alignment was < 0.2 microns. Strength hysteresis was negligible. Thermal expansion of quadrupole and measurement parts caused a repeatable and easily compensated change in the vertical magnetic CL. Calibration procedures as well as CL measurements made over a wider tuning range of 100% to 20% in strength useful for a wide range of applications will be described. The impact of eddy currents in the steel poles on the magnetic field during strength adjustments will be reported.

Gottschalk, S.C.; DeHart, T.E.; Kangas, K.W.; /STI Optronics, Bellevue; Spencer, C.M.; /SLAC; Volk, J.T.; /Fermilab

2006-03-01T23:59:59.000Z

84

Beamline 3.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

2.1 Print 2.1 Print Commercial deep-etch x-ray lithography (LIGA) GENERAL BEAMLINE INFORMATION Operational Yes, but not open to users Source characteristics Bend magnet Energy range 3-12 keV Monochromator None Endstations Hutch with automated scanner Calculated spot size at sample 100 x 10 mm Sample format 3- and 4-in. wafer format; x-ray mask and LIGA substrate Sample environment Ambient, air Scientific disciplines Applied science Scientific applications Deep-etch x-ray lithography (LIGA) Spokesperson This e-mail address is being protected from spambots. You need JavaScript enabled to view it Advanced Light Source, Berkeley Lab Phone: (510) 486-5527 Fax: (510) 486-4102 This e-mail address is being protected from spambots. You need JavaScript enabled to view it AXSUN Technology

85

Beamline 3.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

2.1 Print 2.1 Print Commercial deep-etch x-ray lithography (LIGA) GENERAL BEAMLINE INFORMATION Operational Yes, but not open to users Source characteristics Bend magnet Energy range 3-12 keV Monochromator None Endstations Hutch with automated scanner Calculated spot size at sample 100 x 10 mm Sample format 3- and 4-in. wafer format; x-ray mask and LIGA substrate Sample environment Ambient, air Scientific disciplines Applied science Scientific applications Deep-etch x-ray lithography (LIGA) Spokesperson This e-mail address is being protected from spambots. You need JavaScript enabled to view it Advanced Light Source, Berkeley Lab Phone: (510) 486-5527 Fax: (510) 486-4102 This e-mail address is being protected from spambots. You need JavaScript enabled to view it AXSUN Technology

86

Beamline 3.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

2.1 Print 2.1 Print Commercial deep-etch x-ray lithography (LIGA) GENERAL BEAMLINE INFORMATION Operational Yes, but not open to users Source characteristics Bend magnet Energy range 3-12 keV Monochromator None Endstations Hutch with automated scanner Calculated spot size at sample 100 x 10 mm Sample format 3- and 4-in. wafer format; x-ray mask and LIGA substrate Sample environment Ambient, air Scientific disciplines Applied science Scientific applications Deep-etch x-ray lithography (LIGA) Spokesperson This e-mail address is being protected from spambots. You need JavaScript enabled to view it Advanced Light Source, Berkeley Lab Phone: (510) 486-5527 Fax: (510) 486-4102 This e-mail address is being protected from spambots. You need JavaScript enabled to view it AXSUN Technology

87

Beamline 3.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

2.1 Print 2.1 Print Commercial deep-etch x-ray lithography (LIGA) GENERAL BEAMLINE INFORMATION Operational Yes, but not open to users Source characteristics Bend magnet Energy range 3-12 keV Monochromator None Endstations Hutch with automated scanner Calculated spot size at sample 100 x 10 mm Sample format 3- and 4-in. wafer format; x-ray mask and LIGA substrate Sample environment Ambient, air Scientific disciplines Applied science Scientific applications Deep-etch x-ray lithography (LIGA) Spokesperson This e-mail address is being protected from spambots. You need JavaScript enabled to view it Advanced Light Source, Berkeley Lab Phone: (510) 486-5527 Fax: (510) 486-4102 This e-mail address is being protected from spambots. You need JavaScript enabled to view it AXSUN Technology

88

Beamline 3.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

2.1 Print 2.1 Print Commercial deep-etch x-ray lithography (LIGA) GENERAL BEAMLINE INFORMATION Operational Yes, but not open to users Source characteristics Bend magnet Energy range 3-12 keV Monochromator None Endstations Hutch with automated scanner Calculated spot size at sample 100 x 10 mm Sample format 3- and 4-in. wafer format; x-ray mask and LIGA substrate Sample environment Ambient, air Scientific disciplines Applied science Scientific applications Deep-etch x-ray lithography (LIGA) Spokesperson This e-mail address is being protected from spambots. You need JavaScript enabled to view it Advanced Light Source, Berkeley Lab Phone: (510) 486-5527 Fax: (510) 486-4102 This e-mail address is being protected from spambots. You need JavaScript enabled to view it AXSUN Technology

89

Beamline 8.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Print 1 Print Berkeley Center for Structural Biology (BCSB) Multiple-Wavelength Anomalous Diffraction (MAD) and Macromolecular Crystallography (MX) Scientific discipline: Structural biology GENERAL BEAMLINE INFORMATION Operational Yes Proposal cycle Proposals for Structural Biology Beamlines (2-month cycle) Source characteristics Superbend magnet (5.0 T, single pole) Energy range 5-16 keV Monochromator Double crystal, Si(111) Measured flux (1.9 GeV, 400 mA) 3.0 x 1011 photons/sec Resolving power (E/ΔE) 7,000 Divergence (max at sample) 3.0 (h) x 0.5 (v) mrad Measured spot size (FWHM) 100 µm Endstations Minihutch Detectors 3x3 CCD array (ADSC Q315R) Sample format Single crystals of biological molecules Sample preparation Support labs available Sample environment Ambient or ~100 K

90

Beamline 8.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Print 1 Print Berkeley Center for Structural Biology (BCSB) Multiple-Wavelength Anomalous Diffraction (MAD) and Macromolecular Crystallography (MX) Scientific discipline: Structural biology GENERAL BEAMLINE INFORMATION Operational Yes Proposal cycle Proposals for Structural Biology Beamlines (2-month cycle) Source characteristics Superbend magnet (5.0 T, single pole) Energy range 5-16 keV Monochromator Double crystal, Si(111) Measured flux (1.9 GeV, 400 mA) 3.0 x 1011 photons/sec Resolving power (E/ΔE) 7,000 Divergence (max at sample) 3.0 (h) x 0.5 (v) mrad Measured spot size (FWHM) 100 µm Endstations Minihutch Detectors 3x3 CCD array (ADSC Q315R) Sample format Single crystals of biological molecules Sample preparation Support labs available Sample environment Ambient or ~100 K

91

Beamline 8.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Print 1 Print Berkeley Center for Structural Biology (BCSB) Multiple-Wavelength Anomalous Diffraction (MAD) and Macromolecular Crystallography (MX) Scientific discipline: Structural biology GENERAL BEAMLINE INFORMATION Operational Yes Proposal cycle Proposals for Structural Biology Beamlines (2-month cycle) Source characteristics Superbend magnet (5.0 T, single pole) Energy range 5-16 keV Monochromator Double crystal, Si(111) Measured flux (1.9 GeV, 400 mA) 3.0 x 1011 photons/sec Resolving power (E/ΔE) 7,000 Divergence (max at sample) 3.0 (h) x 0.5 (v) mrad Measured spot size (FWHM) 100 µm Endstations Minihutch Detectors 3x3 CCD array (ADSC Q315R) Sample format Single crystals of biological molecules Sample preparation Support labs available Sample environment Ambient or ~100 K

92

Beamline 8.2.1  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Print 1 Print Berkeley Center for Structural Biology (BCSB) Multiple-Wavelength Anomalous Diffraction (MAD) and Macromolecular Crystallography (MX) Scientific discipline: Structural biology GENERAL BEAMLINE INFORMATION Operational Yes Proposal cycle Proposals for Structural Biology Beamlines (2-month cycle) Source characteristics Superbend magnet (5.0 T, single pole) Energy range 5-16 keV Monochromator Double crystal, Si(111) Measured flux (1.9 GeV, 400 mA) 3.0 x 1011 photons/sec Resolving power (E/ΔE) 7,000 Divergence (max at sample) 3.0 (h) x 0.5 (v) mrad Measured spot size (FWHM) 100 µm Endstations Minihutch Detectors 3x3 CCD array (ADSC Q315R) Sample format Single crystals of biological molecules Sample preparation Support labs available Sample environment Ambient or ~100 K

93

Buildings Energy Data Book: 1.2 Building Sector Expenditures  

Buildings Energy Data Book (EERE)

7 7 2025 Buildings Energy End-Use Expenditure Splits, by Fuel Type ($2010 Billion) (1) Natural Petroleum Gas Distil. Resid. LPG Oth(2) Total Coal Electricity Total Percent Space Heating (3) 56.7 14.3 1.5 7.8 0.7 24.3 0.2 19.5 100.7 22.0% Space Cooling 0.3 50.5 50.9 11.1% Lighting 45.2 45.2 9.9% Water Heating 21.3 2.3 1.3 3.6 19.6 44.4 9.7% Refrigeration (4) 24.9 24.9 5.4% Electronics (5) 23.2 23.2 5.1% Computers 13.2 13.2 2.9% Wet Clean (6) 0.8 9.8 10.5 2.3% Cooking 4.8 0.8 0.8 4.9 10.5 2.3% Ventilation (7) 16.6 16.6 3.6% Other (8) 4.8 0.4 10.6 1.7 12.7 69.8 87.4 19.1% Adjust to SEDS (9) 5.9 4.9 4.9 19.2 30.0 6.6% Total 94.6 21.9 1.5 20.6 2.5 46.4 0.2 316.3 457.4 100% Note(s): Source(s): 1) Expenditures include coal and exclude wood. 2) Includes kerosene space heating ($0.7 billion) and motor gasoline other uses ($1.7 billion). 3) Includes furnace fans ($4.7 billion). 4) Includes refrigerators ($22.3 billion) and freezers ($2.6 billion). 5) Includes color televisions ($12.0

94

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

July '99 to Aug. '99: -0.1% Aug. '98 to Aug. '99: -1.4% YTD '98 to YTD '99: -0.7% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct...

95

Data:2ae1a529-c5b2-4ff6-81e1-1448de76b1be | Open Energy Information  

Open Energy Info (EERE)

a529-c5b2-4ff6-81e1-1448de76b1be a529-c5b2-4ff6-81e1-1448de76b1be No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Juneau Utility Comm Effective date: 2010/07/15 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

96

ARM - Evaluation Product - Sonde-Adjust  

NLE Websites -- All DOE Office Websites (Extended Search)

ProductsSonde-Adjust ProductsSonde-Adjust Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Evaluation Product : Sonde-Adjust Site(s) FKB GRW HFE NIM NSA PYE SGP TWP General Description The sonde-adjust VAP produces data that corrects documented biases in radiosonde humidity measurements. Unique fields contained within this datastream include smoothed original relative humidity, dry bias corrected relative humidity, and final corrected relative humidity. The smoothed RH field refines the relative humidity from integers - the resolution of the instrument - to fractions of a percent. This profile is then used to calculate the dry bias corrected field. The final correction fixes a time-lag problem and uses the dry-bias field as input into the algorithm.

97

Data:F936b9f4-0442-4860-b4e6-4af17ad2e1b6 | Open Energy Information  

Open Energy Info (EERE)

6b9f4-0442-4860-b4e6-4af17ad2e1b6 6b9f4-0442-4860-b4e6-4af17ad2e1b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting MV 175 W Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW): Maximum (kW):

98

Data:F07da1bd-bc5a-4394-8ace-306f2c4e47dd | Open Energy Information  

Open Energy Info (EERE)

da1bd-bc5a-4394-8ace-306f2c4e47dd da1bd-bc5a-4394-8ace-306f2c4e47dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting HPS 150 W Acorn Post Top (Includes Pole) Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability

99

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Sep '99 to Oct '99: -1.9% Oct '98 to Oct '99: -0.7% YTD '98 to YTD '99: +0.4% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct...

100

Adjusted Growth Rates*  

Annual Energy Outlook 2012 (EIA)

June '99 to July '99: +0.5% July '98 to July '99: +1.0% YTD '98 to YTD '99: -0.3% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct...

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

,"U.S. Shale Proved Reserves Adjustments (Billion Cubic Feet...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Shale Proved Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8...

102

,"U.S. Coalbed Methane Proved Reserves Adjustments (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

ame","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Coalbed Methane Proved Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release...

103

,"U.S. Crude Oil + Lease Condensate Reserves Adjustments (Million...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Crude Oil + Lease Condensate Reserves Adjustments (Million Barrels)",1,"Annual",2011 ,"Release...

104

,"New Mexico Dry Natural Gas Reserves Adjustments (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New Mexico Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release...

105

Adjusted Growth Rates* Jan.  

U.S. Energy Information Administration (EIA) Indexed Site

Dec '99 to Jan '00: -9.3% Jan '99 to Jan '00: +3.5% YTD '99 to YTD '00: +3.5% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct...

106

Nation Weekly May 2, 2004, Volume 1, Number 2  

E-Print Network (OSTI)

;#2;#3;#4; #5;#6;#7;#8;#2;#8; #8; #1;#2;#2;#3;#4;#5;#6; #7;#8; #11; #12;#1;#8; #2; cover.pm6 4/25/04, 3:46 AM1 For your tailor-madefinancial services #1;#2;#3;#4;#5;#6;#7;#8;#7;#2;#3; #4; #11;#3;#12;#3;#4; #14;#15;#6;#7;#3;#15;#15; #4;#2... : 4249388/ 4249396/ 4266101 | Fax: 977-1-4249477 | Email:ace@ace.com.np #1;#2;#3;#4;#5; #6;#7;#1;#7;#2;#3;#4;#2;#8; #1;#7;#11; cover.pm6 4/25/04, 3:47 AM2 #1;#2;#3;#4;#5;#6;#7; #1; #2;#3;#4;#5;#6;#7;#8; #5;#11; #12;#5; #4;#7;#14;#3;#15;#16; #1...

Upadhyay, Akhilesh

107

Compact high precision adjustable beam defining aperture  

DOE Patents (OSTI)

The present invention provides an adjustable aperture for limiting the dimension of a beam of energy. In an exemplary embodiment, the aperture includes (1) at least one piezoelectric bender, where a fixed end of the bender is attached to a common support structure via a first attachment and where a movable end of the bender is movable in response to an actuating voltage applied to the bender and (2) at least one blade attached to the movable end of the bender via a second attachment such that the blade is capable of impinging upon the beam. In an exemplary embodiment, the beam of energy is electromagnetic radiation. In an exemplary embodiment, the beam of energy is X-rays.

Morton, Simon A; Dickert, Jeffrey

2013-07-02T23:59:59.000Z

108

1. Sentence 9.25.2.1.(1) and Table 9.25.2.1. state:  

E-Print Network (OSTI)

The amendments to the Alberta Building Code 2006 addressing high-intensity residential fires include a requirement to provide a drywall finish (or other similar performing material), along with insulation and vapour barrier to the interior of attached garages. The requirement for the interior finish was added to delay the spread of a fire originating in an attached garage and to give occupants extra time to evacuate the associated dwelling unit. The requirement for insulation and a vapour barrier was added to the amendments as a precautionary measure due to the presence of the interior finish. It was felt that homeowners who purchase a house with a finished garage may be unaware that there was no insulation in the walls. If that homeowner were to then provide heat to the garage, thinking that it was in fact insulated, condensation would form within the exterior wall assembly which could lead to deterioration of the garage structural supports and the potential for the formation of mould and mildew. Sentence 9.25.2.1.(1) and Table 9.25.2.1. contain requirements for insulating heated garage, but does not contain any requirements for an unheated garage. This STANDATA has been developed to clarify what minimum insulation values are to be supplied in unheated attached garages.

unknown authors

2009-01-01T23:59:59.000Z

109

Visual Terrain Mapping for Mars Exploration1,2 0-7803-8155-6/04/$17.00 2004 IEEE  

E-Print Network (OSTI)

1 Visual Terrain Mapping for Mars Exploration1,2 1 0-7803-8155-6/04/$17.00© 2004 IEEE 2 IEEEAC. The techniques used include wide-baseline stereo mapping for terrain distant from the rover, bundle adjustment images. However, current rover technologies do not allow rovers to autonomously navigate to distant

Li, Rongxing ?Ron?

110

Data:E96dc2d1-abdc-4cde-bd0d-b1ada38fdae7 | Open Energy Information  

Open Energy Info (EERE)

d1-abdc-4cde-bd0d-b1ada38fdae7 d1-abdc-4cde-bd0d-b1ada38fdae7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: 2012/10/01 End date if known: Rate name: City of Austin - Owned Outdoor Lighting - 400 W Mercury Vapor Sector: Description: Power Supply Adjustment fee - plus an adjustment for variable costs, calculated under the Power Supply Adjustment rate schedule , multiplied by the billable kWh. Source or reference: www.austinenergy.com/About Us/Rates/index.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

111

Black-Scholes 2.1 . . . . . . . . . . . . . . . . . . . . 5  

E-Print Network (OSTI)

Black-Scholes #12;1 2 2 5 2.1 . . . . . . . . . . . . . . . . . . . . 5 2-Ocone) . . . . . . . . . . . . . . . . . 18 4 Black-Scholes 25 4.1 Black-Scholes . . . . . . . . . . . . . . . . . . . . . . . 25 4}(d) . , (t) , (t)S t dWt . = 1 [8] , Black-Scholes . [8] , Black-Scholes . , . , 1 t log(St S0 ) . , [8] [6

Hattori, Tetsuya

112

Data:D1d2f727-0561-48c1-9f79-9b04027e7bdd | Open Energy Information  

Open Energy Info (EERE)

f727-0561-48c1-9f79-9b04027e7bdd f727-0561-48c1-9f79-9b04027e7bdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Residential & Farm Single Phase Sector: Residential Description: This schedule is applicable to domestic use of electric energy by all residential and farm service customers. Residential and farm service accounts are billed on a monthly cycle. Power Cost Adjustment Factor = 7% The Power Cost Adjustment is based on rate adjustments from BPA . Source or reference: http://www.pacificpud.org/rate_resfarm.html

113

Shale Natural Gas Reserves Adjustments  

U.S. Energy Information Administration (EIA) Indexed Site

90 7,579 1,584 2009-2011 Alaska 0 0 0 2009-2011 Lower 48 States 1,690 7,579 1,584 2009-2011 Alabama 0 0 2009-2010 Arkansas 2 63 655 2009-2011 Colorado 1 -1 0 2009-2011 Kentucky -1...

114

U.S. Commercial Buildings Weather Adjusted Site Energy Intensity  

U.S. Energy Information Administration (EIA)

Table 6c. U.S. Commercial Buildings Energy Intensity Using. Weather-Adjusted Site Energy. 1. ... Laboratory buildings are included in the "Other" category.

115

U.S. Residential Housing Weather Adjusted Site Energy Consumption ...  

U.S. Energy Information Administration (EIA)

Home > Households, Buildings & Industry > Energy Efficiency > Residential Housing Energy Intensities > Table 1b Glossary U.S. Residential Housing Weather Adjusted ...

116

U.S. Commercial Buildings Weather Adjusted Primary Energy ...  

U.S. Energy Information Administration (EIA)

Weather-Adjusted Primary Energy. 1. by Census Region and Principal. Building Activity, 1992, 1995, and 2003 (Million Btu per Building) Principal ...

117

U.S. Commercial Buildings Weather Adjusted Primary Energy ...  

U.S. Energy Information Administration (EIA)

Using . Weather-Adjusted. Primary Energy. 1. by Census Region and Principal Building Activity, 1992, 1995, and 2003 (Thousand Btu per Square Foot) ...

118

2.1E Supplement  

E-Print Network (OSTI)

unit with dehumidifier and heat exchanger, with regenerationa dehumdifier plus heat exchanger, as in Mode 1, but withoutoutside air leaving the heat exchanger is exhausted and does

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

119

Oil and Global Adjustment  

E-Print Network (OSTI)

The current account surplus of the worlds major oil exporting economies defined as the IMFs fuel-exporting emerging economies plus Norway increased from $110b to about $500b between 2002 and 2006. 2 In 2006, the current account surplus of the Gulf

Brad Setser

2007-01-01T23:59:59.000Z

120

? Adjustable Output Voltage  

E-Print Network (OSTI)

The LM25010 features all the functions needed to implement a low cost, efficient, buck regulator capable of supplying in excess of 1A load current. This high voltage regulator integrates an N-Channel Buck Switch, and is available in thermally enhanced LLP-10 and TSSOP-14EP packages. The constant on-time regulation scheme requires no loop compensation resulting in fast load transient response and simplified circuit implementation. The operating frequency remains constant with line and load variations due to the inverse relationship between the input voltage and the on-time. The valley current limit detection is set at 1.25A. Additional features include: VCC under-voltage lock-out, thermal shutdown, gate drive under-voltage lock-out, and maximum duty cycle limiter.

Lmq Is Aec-q Grade

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Dry Natural Gas Reserves Adjustments  

Gasoline and Diesel Fuel Update (EIA)

743 1,147 207 5,098 509 1,731 1977-2011 743 1,147 207 5,098 509 1,731 1977-2011 Federal Offshore U.S. -39 -62 14 22 -123 -28 1990-2011 Pacific (California) 2 -7 -1 0 0 -1 1977-2011 Louisiana & Alabama -37 -16 10 2 -106 -28 1981-2011 Texas -4 -39 5 20 -17 1 1981-2011 Alaska -46 1 -3 3 1 -1 1977-2011 Lower 48 States 789 1,146 210 5,095 508 1,732 1977-2011 Alabama -11 12 -71 46 32 -49 1977-2011 Arkansas -26 -27 -64 5 -34 728 1977-2011 California -74 33 -6 11 10 923 1977-2011 Coastal Region Onshore -62 3 0 2 1 13 1977-2011 Los Angeles Basin Onshore 0 0 2 5 5 7 1977-2011 San Joaquin Basin Onshore -12 31 -8 2 4 902 1977-2011 State Offshore 0 -1 0 2 0 1 1977-2011 Colorado 52 136 -250 306 449 801 1977-2011 Florida 2 4 79 6 64 -54 1977-2011

122

Dry Natural Gas Reserves Adjustments  

U.S. Energy Information Administration (EIA) Indexed Site

743 1,147 207 5,098 509 1,731 1977-2011 743 1,147 207 5,098 509 1,731 1977-2011 Federal Offshore U.S. -39 -62 14 22 -123 -28 1990-2011 Pacific (California) 2 -7 -1 0 0 -1 1977-2011 Louisiana & Alabama -37 -16 10 2 -106 -28 1981-2011 Texas -4 -39 5 20 -17 1 1981-2011 Alaska -46 1 -3 3 1 -1 1977-2011 Lower 48 States 789 1,146 210 5,095 508 1,732 1977-2011 Alabama -11 12 -71 46 32 -49 1977-2011 Arkansas -26 -27 -64 5 -34 728 1977-2011 California -74 33 -6 11 10 923 1977-2011 Coastal Region Onshore -62 3 0 2 1 13 1977-2011 Los Angeles Basin Onshore 0 0 2 5 5 7 1977-2011 San Joaquin Basin Onshore -12 31 -8 2 4 902 1977-2011 State Offshore 0 -1 0 2 0 1 1977-2011 Colorado 52 136 -250 306 449 801 1977-2011 Florida 2 4 79 6 64 -54 1977-2011

123

Data:C17c571e-7196-49f2-a261-dedcc1b1e2b6 | Open Energy Information  

Open Energy Info (EERE)

1e-7196-49f2-a261-dedcc1b1e2b6 1e-7196-49f2-a261-dedcc1b1e2b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Gs-2 General Service- Optional Time-of-Day 8am-8pm Single Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

124

Table HC1.2.1. Living Space Characteristics by  

U.S. Energy Information Administration (EIA) Indexed Site

1. Living Space Characteristics by" 1. Living Space Characteristics by" " Total, Heated, and Cooled Floorspace, 2005" ,,,"Total Square Footage" ,"Housing Units",,"Total1",,"Heated",,"Cooled" "Living Space Characteristics","Millions","Percent","Billions","Percent","Billions","Percent","Billions","Percent" "Total",111.1,100,225.8,100,179.8,100,114.5,100 "Total Floorspace (Square Feet)1" "Fewer than 500",3.2,2.9,1.2,0.5,1.1,0.6,0.4,0.3 "500 to 999",23.8,21.4,17.5,7.7,15.9,8.8,7.3,6.4 "1,000 to 1,499",20.8,18.7,24.1,10.7,22.6,12.6,13,11.4 "1,500 to 1,999",15.4,13.9,24.5,10.9,22.2,12.4,14,12.2

125

Hydrostatic Adjustment in Nonisothermal Atmospheres  

Science Conference Proceedings (OSTI)

The author examines hydrostatic adjustment due to heating in two nonisothermal atmospheres. In the first case both the temperature and lapse rate decrease with height; in the second case the atmosphere consists of a troposphere with constant ...

Dean G. Duffy

2003-01-01T23:59:59.000Z

126

Automatic Adjustment of AVHRR Navigation  

Science Conference Proceedings (OSTI)

An automatic adjustment method of the Advanced Very High-Resolution Radiometer (AVHRR) images navigation has been developed for operational use at the Centre de Mtorologic Spatiale (CMS) in Lannion, France. Selected coastal landmarks are ...

Philippe Bordes; Pascal Brunel; Anne Marsouin

1992-02-01T23:59:59.000Z

127

Geostrophic Adjustment on Hexagonal Grids  

Science Conference Proceedings (OSTI)

A simple two-dimensional linearized model of the atmosphere is used to investigate behavior of the geostrophic adjustment process on five selected horizontal hexagonal grids. This study shows that hexagonal lattices have some advantages over ...

Slobodan Ni?kovi?; Milivoj B. Gavrilov; Ivana A. Toi?

2002-03-01T23:59:59.000Z

128

Natural Gas Liquids Reserves Adjustments  

Gasoline and Diesel Fuel Update (EIA)

-338 273 -89 173 -139 76 1979-2008 -338 273 -89 173 -139 76 1979-2008 Federal Offshore U.S. -101 119 26 47 -7 -29 1981-2008 Pacific (California) 0 0 0 1 0 1 1979-2008 Louisiana & Alabama -93 118 29 44 -3 -32 1981-2008 Texas -8 1 -3 2 -4 2 1981-2008 Alaska 0 0 0 0 0 0 1979-2008 Lower 48 States -338 273 -89 173 -139 76 1979-2008 Alabama -2 -5 0 9 -13 76 1979-2008 Arkansas -1 0 0 2 -2 -1 1979-2008 California 11 9 -6 8 0 5 1979-2008 Coastal Region Onshore 1 1 -3 5 -7 1 1979-2008 Los Angeles Basin Onshore -1 0 0 0 1 2 1979-2008 San Joaquin Basin Onshore 11 8 -3 3 6 2 1979-2008 State Offshore 0 0 0 0 0 0 1979-2008 Colorado -38 55 -19 -14 -23 120 1979-2008 Florida 4 -5 -5 -2 -2 -1 1979-2008 Kansas 3 32 -25 8 -9 5 1979-2008

129

Coalbed Methane Reserves Adjustments  

Gasoline and Diesel Fuel Update (EIA)

-14 784 -15 2009-2011 -14 784 -15 2009-2011 Federal Offshore U.S. 0 0 0 2009-2011 Pacific (California) 0 0 0 2009-2011 Louisiana & Alabama 0 0 0 2009-2011 Texas 0 0 0 2009-2011 Alaska 0 0 0 2009-2011 Lower 48 States -14 784 -15 2009-2011 Alabama 0 61 -45 2009-2011 Arkansas 0 1 0 2009-2011 California 0 0 0 2009-2011 Coastal Region Onshore 0 0 0 2009-2011 Los Angeles Basin Onshore 0 0 0 2009-2011 San Joaquin Basin Onshore 0 0 0 2009-2011 State Offshore 0 0 0 2009-2011 Colorado 0 106 73 2009-2011 Florida 0 0 0 2009-2011 Kansas -3 -22 -6 2009-2011 Kentucky 0 0 0 2009-2011 Louisiana 0 0 0 2009-2011 North 0 0 0 2009-2011 South Onshore 0 0 0 2009-2011 State Offshore 0 0 0 2009-2011 Michigan 0 0 0 2009-2011 Mississippi 0 0 0 2009-2011 Montana

130

2.1E Supplement  

E-Print Network (OSTI)

I T Y - R A T E Command Cogeneration B L O C K - C H A R G Econsultant for the P l a n t Cogeneration a n d t h e R e fa n d chillers for cogeneration, (2) simpler f u n c t i o n

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

131

Microwave Engineering Lecture 1 & 2  

E-Print Network (OSTI)

& enclosed charge 2.M.flux & enclosed charge 3.EMF induced time varying magnetic flux 4.DC current flow generate H.flux 5. D=E ; B=µH ; J=E 6.Behavior of EM fields/wave 7.Static E.field (char. capacitor) 8 to current distribution. 14.Time varying fields/waves 15.Linear resistor law 16.Voltage and current law 17

Iqbal, Sheikh Sharif

132

Shale Natural Gas Reserves Adjustments  

Gasoline and Diesel Fuel Update (EIA)

90 7,579 1,584 2009-2011 Alaska 0 0 0 2009-2011 Lower 48 States 1,690 7,579 1,584 2009-2011 Alabama 0 0 2009-2010 Arkansas 2 63 655 2009-2011 California 1 2011-2011 San Joaquin...

133

Data:8d24b11d-2e1d-4752-bdc9-94c5dd95e71b | Open Energy Information  

Open Energy Info (EERE)

b11d-2e1d-4752-bdc9-94c5dd95e71b b11d-2e1d-4752-bdc9-94c5dd95e71b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Piedmont Electric Member Corp Effective date: 2012/05/01 End date if known: Rate name: RESIDENTIAL SERVICE Three-Phase(RS-3) Sector: Residential Description: Renewable Energy Portfolio Standard (REPS) Adjustment: The consumer's monthly bill shall also include a REPS adjustment based upon the revenue classification of the account. The revenue classifications and monthly charges are shown in the Cooperative's Rider REPS. (REPS) Adjustment:Residential $ 0.35, this adjustment is included in the Fixed Monthly Charge listed below.

134

TTW 2-1-10  

NLE Websites -- All DOE Office Websites (Extended Search)

10 10 WIPP Quick Facts (As of 1-31-10) 8,188 Shipments received since opening (7,869 CH and 319 RH) 65,198 Cubic meters of waste disposed (65,043 CH and 155 RH) 127,413 Containers disposed in the underground (127,101 CH and 312 RH) WIPP operations resume following outage Employees work in WIPP's underground during the extended maintenance outage. The outage ended on December 31 and waste handling and disposal has resumed. WIPP is back in disposal mode following a six-week maintenance outage. The facility resumed disposal operations the week of January 4 with all essential projects completed. The annual outage is used to complete major maintenance and upgrade projects that cannot be done while WIPP is receiving shipments and disposing of waste underground.

135

THERM 2.1 NFRC simulation manual  

E-Print Network (OSTI)

Heat Transfer Code Users Manual and Thermal Property DataTHERM 2.1 NFRC Simulation Manual JULY 2000 4. SUMMARY OFTHERM 2.1 NFRC Simulation Manual JULY 2000 9.5 Problem 4:

2000-01-01T23:59:59.000Z

136

RSE Table S1.1 and S1.2. Relative Standard Errors for Tables S1.1 and S1.2  

U.S. Energy Information Administration (EIA) Indexed Site

S1.1 and S1.2. Relative Standard Errors for Tables S1.1 and S1.2;" S1.1 and S1.2. Relative Standard Errors for Tables S1.1 and S1.2;" " Unit: Percents." " "," "," "," "," "," "," "," "," "," "," " " "," "," ",," "," ",," "," ",," ","Shipments" "SIC"," ",,"Net","Residual","Distillate",,"LPG and",,"Coke and"," ","of Energy Sources" "Code(a)","Major Group and Industry","Total(b)","Electricity(c)","Fuel Oil","Fuel Oil(d)","Natural Gas(e)","NGL(f)","Coal","Breeze","Other(g)","Produced Onsite(h)"

137

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

at ORNL. RCRA permits (see Table 2.1). The K-1435 Toxic The HSWA permit requires DOE to address past changes to SWMUs that could alter further RCRA units. investigation or corrective action. DOE has pro- 2.2.1.1 RCRA Assessments, Closures, and Corrective Measures The Hazardous and Solid Waste Amendments (HSWA

Pennycook, Steve

138

Price adjustment at multiproduct retailers  

E-Print Network (OSTI)

We empirically study the price adjustment process at multiproduct retail stores. We use a unique store level data set for five large supermarket and one drugstore chains in the U.S., to document the exact process required to change prices. Our data set allows us to study this process in great detail, describing the exact procedure, stages, and steps undertaken during the price change process. We also discuss various aspects of the microeconomic environment in which the price adjustment decisions are made, factors affecting the price adjustment decisions, and firm-level implications of price adjustment decisions. Specifically, we examine the effects of the complexity of the price change process on the stores pricing strategy. We also study how the steps involved in the price change process, combined with the laws governing the retail price setting and adjustment, along with the competitive market structure of the retail grocery industry, influence the frequency of price changes. We also examine how the mistakes that occur in the price change process influence the actions taken by these multiproduct retailers. In particular, we study how these mistakes can make the stores vulnerable to civil law suits and penalties, and also damage their reputation. We also show how the mistakes can lead to stockouts or unwanted inventory accumulations. Finally, we discuss how retail stores try to minimize these

Daniel Levy; Mark Bergen; Robert Venable; Robert W. Baird

1998-01-01T23:59:59.000Z

139

Freeway Analysis Manual: Parts 1 and 2  

E-Print Network (OSTI)

57 2.9.1 Existing Ramp Metering Operations 2.9.2 Existingof implementing ramp metering in combination with addingcorridor such as with ramp metering are to be modeled.

May, Dolf; Leiman, Lannon

2005-01-01T23:59:59.000Z

140

Rate Adjustments and Public Involvement  

NLE Websites -- All DOE Office Websites (Extended Search)

Rate Adjustments and Public Involvement Documents Rate Adjustments and Public Involvement Documents CRSP Transmission 9/16/2013 WAPA-161 FRN, CRSP transmission and ancillary services rates extension Letter announcing two-year extension to CRSP transmission and ancillary services rates Letter announcing revised CRSP transmission rates for FY 2014 Accompanying calculation table for FY 2014 CRSP transmission rate letter Letter announcing revised CRSP transmission rates for FY 2013 Letter announcing revised CRSP transmission rates for FY 2012 Letter announcing revised CRSP transmission rates for FY 2011 Letter announcing revised CRSP transmission rates for FY 2010 SLCA/IP 9/16/2013 WAPA-161 FRN, SLCA/IP firm power rate extension Letter announcing two-year extension to SLCA/IP firm power rate SLCA/IP Tentative Rate Adjustment Schedule

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE-2, BDL summary. Version 2.1E  

SciTech Connect

This document contains summary information on all commands and keywords in the DOE-2 Building Description Language (BDL). It also contains supplementary tables and maps. The fundamentals of BDL are discussed in Chapter II of the Reference Manual (2.1A); detailed descriptions of the commands and keywords summarized here can be found in the Reference Manual (2.1A) and in the Supplement (2.1E).

Winkelmann, F.C.; Birdsall, B.E.; Buhl, W.F.; Ellington, K.L.; Erdem, A.E. [Lawrence Berkeley Lab., CA (United States); Hirsch, J.J.; Gates, S. [Hirsch & Associates, Camarillo, CA (United States)

1993-11-01T23:59:59.000Z

142

RSE Table N1.1 and N1.2. Relative Standard Errors for Tables N1.1 and N1.2  

U.S. Energy Information Administration (EIA) Indexed Site

1 and N1.2. Relative Standard Errors for Tables N1.1 and N1.2;" 1 and N1.2. Relative Standard Errors for Tables N1.1 and N1.2;" " Unit: Percents." " "," "," "," "," "," "," "," "," "," "," " " "," "," ",," "," ",," "," ",," ","Shipments" "NAICS"," ",,"Net","Residual","Distillate",,"LPG and",,"Coke and"," ","of Energy Sources" "Code(a)","Subsector and Industry","Total(b)","Electricity(c)","Fuel Oil","Fuel Oil(d)","Natural Gas(e)","NGL(f)","Coal","Breeze","Other(g)","Produced Onsite(h)"

143

Data:9aad258e-a368-42e1-9d50-a1de86486ee2 | Open Energy Information  

Open Energy Info (EERE)

e-a368-42e1-9d50-a1de86486ee2 e-a368-42e1-9d50-a1de86486ee2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Extra Large Industrial Service Sector: Industrial Description: To any non-agricultural customers whose monthly maximum demand is greater than 3000 kW for 3 consecutive months. Source or reference: ISU Documentation Source Parent: Comments The bill is subject to a power supply adjuster as set forth in the District's power cost adjuster rate tariff. Applicability Demand (kW) Minimum (kW): Maximum (kW):

144

Data:2e383d6e-79d1-45c1-a2a9-d958e92a63bd | Open Energy Information  

Open Energy Info (EERE)

3d6e-79d1-45c1-a2a9-d958e92a63bd 3d6e-79d1-45c1-a2a9-d958e92a63bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 5,000kW Demand 8am-8pm Transformer Ownership Discount (above 15,000 volts)with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

145

Data:C1b3a2fd-676e-4176-b2a1-969d65397d85 | Open Energy Information  

Open Energy Info (EERE)

a2fd-676e-4176-b2a1-969d65397d85 a2fd-676e-4176-b2a1-969d65397d85 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2007/10/13 End date if known: Rate name: Ms-1 Street and Yard Lighting Service - Yard Lighting 500 W Quartz Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

146

Data:2fed359d-6410-4740-9ef0-3c1ff1ed3d2a | Open Energy Information  

Open Energy Info (EERE)

fed359d-6410-4740-9ef0-3c1ff1ed3d2a fed359d-6410-4740-9ef0-3c1ff1ed3d2a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

147

Data:53d1ad27-017c-4bf1-bec2-dbadff79b3d2 | Open Energy Information  

Open Energy Info (EERE)

ad27-017c-4bf1-bec2-dbadff79b3d2 ad27-017c-4bf1-bec2-dbadff79b3d2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Ms-2 Athletic Field Lighting Service Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0583 per kilowatt-hour.

148

table2.1_02.xls  

U.S. Energy Information Administration (EIA) Indexed Site

1 Nonfuel (Feedstock) Use of Combustible Energy, 2002; 1 Nonfuel (Feedstock) Use of Combustible Energy, 2002; Level: National and Regional Data; Row: NAICS Codes; Column: Energy Sources; Unit: Physical Units or Btu. Coke Residual Distillate Natural LPG and Coal and Breeze NAICS Total Fuel Oil Fuel Oil(b) Gas(c) NGL(d) (million (million Other(e) Code(a) Subsector and Industry (trillion Btu) (million bbl) (million bbl) (billion cu ft) (million bbl) short tons) short tons) (trillion Btu) Total United States RSE Column Factors: 1.4 0.4 1.6 1.2 1.2 1.1 0.7 1.2 311 Food 8 * * 7 0 0 * * 311221 Wet Corn Milling * 0 * 0 0 0 0 * 31131 Sugar * 0 * * 0 0 * * 311421 Fruit and Vegetable Canning * * * 0 0 0 0 * 312 Beverage and Tobacco Products 1 * * * 0 0 0 1 3121 Beverages * * * 0 0 0 0 *

149

Would Border Carbon Adjustments prevent carbon leakage and heavy industry  

E-Print Network (OSTI)

No 52-2013 Would Border Carbon Adjustments prevent carbon leakage and heavy industry halshs-00870689,version1-7Oct2013 #12;Would Border Carbon Adjustments prevent carbon leakage and heavy The efficiency of unilateral climate policies may be hampered by carbon leakage and competitiveness losses

Recanati, Catherine

150

Data:Daf123b2-d60f-4d22-839b-2ad8a2ab1a64 | Open Energy Information  

Open Energy Info (EERE)

Daf123b2-d60f-4d22-839b-2ad8a2ab1a64 Daf123b2-d60f-4d22-839b-2ad8a2ab1a64 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Broad River Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Rate Code 16, 6Lots Per Light Single-Phase Sector: Lighting Description: * Available to residential consumers of the cooperative in residences,condominiums,mobile homes or individually metered apartment. Subject to taxes and wholesale power cost adjustment. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

151

Data:C1049e15-1b03-450d-8257-154d2ccac1a1 | Open Energy Information  

Open Energy Info (EERE)

e15-1b03-450d-8257-154d2ccac1a1 e15-1b03-450d-8257-154d2ccac1a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2007/10/13 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Overhead 200 W IND Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

152

SNS FY 2013 Q1-4 Revision 2 Approved  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Q1-4 Revision 2 Approved Revised 6112013 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6...

153

DOE M 231.1-2  

NLE Websites -- All DOE Office Websites (Extended Search)

M 231.1-2 M 231.1-2 Approved: 08-19-03 OCCURRENCE REPORTING AND PROCESSING OF OPERATIONS INFORMATION U.S. DEPARTMENT OF ENERGY Office of Environment, Safety and Health DOE M 231.1-2 Page i (and ii) 08-19-03 SUBJECT: OCCURRENCE REPORTING AND PROCESSING OF OPERATIONS INFORMATION 1. PURPOSE. This Manual provides detailed requirements to supplement DOE O 231.1A, Environment, Safety, and Health Reporting, dated 08-19-03. This Manual is approved for use by all DOE Elements and their contractors. 2. REFERENCE. DOE O 231.1A, Environment, Safety, and Health Reporting, dated 08-19-03. 3. CANCELLATION. DOE M 232.1-1A, Occurrence Reporting and Processing of Operations Information, dated 7-21-97. Cancellation of a Manual does not, by itself, modify or otherwise

154

Freeway Analysis Manual: Parts 1 and 2  

E-Print Network (OSTI)

BERKELEY Freeway Analysis Manual: Parts 1 and 2 Dolf May,AND 2 OF FREEWAY ANALYSIS MANUAL Prepared by Dolf May LannonThis Freeway Analysis Manual is intended for those who are

May, Dolf; Leiman, Lannon

2005-01-01T23:59:59.000Z

155

Data:De495ae2-d2a2-40b7-93e1-d896bcb5540b | Open Energy Information  

Open Energy Info (EERE)

ae2-d2a2-40b7-93e1-d896bcb5540b ae2-d2a2-40b7-93e1-d896bcb5540b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Commercial General Service Demand Primary Metering/Ownership Sector: Commercial Description: *Applicable to any customer who has demand exceeding 100 kW for three consecutive months. Subject to production cost adjustment and power factor adjustment. Load management credit of $1.40/hp per month (minimum of $5.60 per month) during summer months (June-September) for customers with master metering and city controlled load management.

156

Liquid effluent FY 1996 program plan WBS 1.2.2.1. Revision 1  

Science Conference Proceedings (OSTI)

The Liquid Effluents Program supports the three Hanford Site mission components: (1) Clean up the site, (2) provide scientific and technological excellence to meet global needs, and (3) Partner in the economic diversification of the region. Nine Hanford Site objectives have been established for the Hanford Site programs to accomplish all three components of this mission.

NONE

1995-09-01T23:59:59.000Z

157

Microsoft Word - UPDATE 2 - Unit 1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 to: 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Unit 1 Emissions at Maximum and Minimum Loads ENSR Corporation December 20, 2005 Document Number 10350-002-410 (Update 2) December, 2005 1-1 1.0 INTRODUCTION This report describes AERMOD modeling results performed for Unit 1 at Mirant's Potomac River Generating Station. The purpose of these runs was to demonstrate that operation of Unit 1 for 24 hours a day at loads from 35 MW to 88 MW with the use of trona to reduce SO 2 emissions will not cause or contribute to modeled exceedances of the National Ambient Air Quality Standards (NAAQS). Mirant proposes to use trona on an as needed basis to limit SO 2 emissions to less than 0.89 lb/MMBtu

158

Page 1 of 2 Revised 1 Feb 2013 UBC Utilities  

E-Print Network (OSTI)

SERVICES: WATER, SANITARY, STORM, GAS, and DISTRICT HEATING Part 3 (a). Water Distribution. Water service.5.7 and Section 02730, Clause 2.5.6). #12;Page 2 of 2 Revised 1 Feb 2013 Part 3 (c). Gas and District Heating (%) District Heating Contractor or UBC Dept Telephone Fax Contractor Primary Contact Email Design by (Company

Vellend, Mark

159

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

, and Portsmouth facilities. Both LMES and LMER are DOE prime contractors. DOE's operations on the reservation 1986. SWSA 6 is currently undergoing process knowledge, and repackaging activities. RCRA/CERCLA closure. A revised Closure Plan 2.2.1.1 RCRA Assessments, Closures, and Corrective Measures The Hazardous and Solid

Pennycook, Steve

160

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

the individual RCRA units. 2.2.1.1 RCRA Assessments, Closures, and Corrective Measures The Hazardous and Solid-alone permit; TDEC's was issued as a modification to a Y-12 post-closure permit. DOE submitted comments process, mixed wastes, which are composed of a mixture which is expected to integrate the RCRA closure

Pennycook, Steve

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:1e9f3b3b-c976-4709-b6a1-f41ac67672f2 | Open Energy Information  

Open Energy Info (EERE)

b-c976-4709-b6a1-f41ac67672f2 b-c976-4709-b6a1-f41ac67672f2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Fairfield Electric Coop, Inc Effective date: 2008/12/01 End date if known: Rate name: Residential Service Sector: Description: * Available to residential, farm and home consumers where service requirement necessitate the installation of 50kVA or less transformer capacity. Subject to power cost adjustment and tax adjustment. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

162

Data:F56a1d1a-1c92-4609-93ca-31de322d5b2b | Open Energy Information  

Open Energy Info (EERE)

d1a-1c92-4609-93ca-31de322d5b2b d1a-1c92-4609-93ca-31de322d5b2b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Rg-1 Residential Service Single Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0583 per kilowatt-hour.

163

Chapter 2-1 Table of Contents: Chapter 2  

E-Print Network (OSTI)

..........................................................................21 2.1.4 Washington GAP Analysis Program-14. Distribution of western gray squirrel habitat in Washington 75 Figure 2-15. Predicted current habitat al. 2003) 97 Figure 2-21. Brewer's sparrow breeding range and distribution in Washington (Smith et al

164

Data:2a460ec1-da39-4574-b9c5-103f1af603b7 | Open Energy Information  

Open Energy Info (EERE)

0ec1-da39-4574-b9c5-103f1af603b7 0ec1-da39-4574-b9c5-103f1af603b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1996/05/02 End date if known: Rate name: Commercial Time of Use (Single-Phase), Schedule TOU-C Sector: Commercial Description: Business, industrial and non-residential service. Minimum Charge shall be the highest of: (a) Customer Charge of 10.00; or (b) As prescribed by the line extension policy of the rules and regulations of the Cooperative Subject to Power Cost Adjustment and Tax Adjustment Source or reference: Rates Binder B #4

165

Data:A1e36612-a1ba-45d2-ae09-f9326518952f | Open Energy Information  

Open Energy Info (EERE)

12-a1ba-45d2-ae09-f9326518952f 12-a1ba-45d2-ae09-f9326518952f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 500kW Demand Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

166

RSE Table S2.1 and S2.2. Relative Standard Errors for Tables S2.1 and S2.2  

U.S. Energy Information Administration (EIA) Indexed Site

S2.1 and S2.2. Relative Standard Errors for Tables S2.1 and S2.2;" S2.1 and S2.2. Relative Standard Errors for Tables S2.1 and S2.2;" " Unit: Percents." " "," "," ",," "," "," "," "," "," ",," " "SIC"," "," ","Residual","Distillate",,"LPG and",,"Coke"," " "Code(a)","Major Group and Industry","Total","Fuel Oil","Fuel Oil(b)","Natural Gas(c)","NGL(d)","Coal","and Breeze","Other(e)" ,,"Total United States" , 20,"Food and Kindred Products",5,0,8,0,0,0,0,7 21,"Tobacco Products",0,0,0,0,0,0,0,0

167

RSE Table N2.1 and N2.2. Relative Standard Errors for Tables N2.1 and N2.2  

U.S. Energy Information Administration (EIA) Indexed Site

N2.1 and N2.2. Relative Standard Errors for Tables N2.1 and N2.2;" N2.1 and N2.2. Relative Standard Errors for Tables N2.1 and N2.2;" " Unit: Percents." " "," " "NAICS"," "," ","Residual","Distillate",,"LPG and",,"Coke"," " "Code(a)","Subsector and Industry","Total","Fuel Oil","Fuel Oil(b)","Natural Gas(c)","NGL(d)","Coal","and Breeze","Other(e)" ,,"Total United States" , 311,"Food",6,0,8,0,0,0,0,7 312,"Beverage and Tobacco Products",10,0,82,0,0,0,0,9 313,"Textile Mills",19,0,77,3,20,0,0,48 314,"Textile Product Mills",38,0,0,38,27,0,0,42

168

Data:1d70695f-72e1-4bae-8b33-23e1e473a2a7 | Open Energy Information  

Open Energy Info (EERE)

5f-72e1-4bae-8b33-23e1e473a2a7 5f-72e1-4bae-8b33-23e1e473a2a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2013/06/01 End date if known: Rate name: Rate Adjustment Mechanism Provision Sector: Description: Purpose This mechanism is subject to review and continuation, termination or modification in the utility's next base rate case proceeding, upon a showing by the utility and finding by the Commission that continuation or modification is appropriate. As part of its submitted testimony in the base rate case, the Company will include a summary report of the status of certain HCEI initiatives. The RAM mechanism is designed to determine the change in annual utility base revenue levels, recognizing certain estimated changes in the utility's cost to provide service. If, through the application of this mechanism, it is determined that annual utility base revenues should be decreased or increased, then the RAM Revenue Adjustment will be applied within the Revenue Balancing Account Provision. The RAM Revenue Adjustment established for a RAM Period calendar year that is also a rate case test year shall terminate on the effective date of tariff rates that are implemented pursuant to a Commission Decision & Order for that test year, unless otherwise specified below.

169

TableHC2.1.xls  

U.S. Energy Information Administration (EIA) Indexed Site

Total.............................................................. Total.............................................................. 111.1 78.1 64.1 4.2 1.8 2.3 5.7 Census Region and Division Northeast.................................................... 20.6 13.4 10.4 1.4 1.0 0.3 0.4 New England........................................... 5.5 3.8 3.1 Q 0.3 Q Q Middle Atlantic........................................ 15.1 9.6 7.3 1.3 0.6 Q Q Midwest...................................................... 25.6 19.4 16.9 1.0 0.5 0.4 0.7 East North Central.................................. 17.7 13.6 11.7 0.7 0.5 Q 0.3 West North Central................................. 7.9 5.8 5.2 Q Q Q 0.3 South.......................................................... 40.7 28.9 23.8 0.8 Q 0.9 3.1 South Atlantic.......................................... 21.7 15.3 12.0 0.6 Q 0.9 1.5 East South Central..................................

170

Adjustable extender for instrument module  

DOE Patents (OSTI)

A blank extender module used to mount an instrument module in front of its console for repair or test purposes has been equipped with a rotatable mount and means for locking the mount at various angles of rotation for easy accessibility. The rotatable mount includes a horizontal conduit supported by bearings within the blank module. The conduit is spring-biased in a retracted position within the blank module and in this position a small gear mounted on the conduit periphery is locked by a fixed pawl. The conduit and instrument mount can be pulled into an extended position with the gear clearing the pawl to permit rotation and adjustment of the instrument.

Sevec, J.B.; Stein, A.D.

1975-11-01T23:59:59.000Z

171

Adjustable Speed Drive Industrial Applications  

E-Print Network (OSTI)

Electric motors are significant users of electricity in the United States. Approximately 66 percent of the total electricity in the U.S. is used by electric motors. Electronic adjustable speed drives (ASDs) can save energy, lower maintenance cost and improve product quality. By providing a variable frequency output to ac motors the speed of the motors can be controlled and matched to the process requirements. The benefits that may be derived from using ASDs are described and the type of ASDs, applications and specific case studies of ASD installations are also discussed.

Poole, J. N.

1989-09-01T23:59:59.000Z

172

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

status units completed the steps for RCRA closure by the end of the calendar year (Table 2.1). ORNL to permitting under TN Rule 1200-1-7-.02. At ETTP, the RCRA closure of K-1025C was completed in CY 2004, while K Assessments, Closures, and Corrective Measures The Hazardous and Solid Waste Amend- ments to RCRA, passed

Pennycook, Steve

173

CHAPTER 2 SOFTWARE PROJECT PLANNING 2.1 Introduction  

E-Print Network (OSTI)

are available for constructing process models and estimating software project costs. Project planning tools10 CHAPTER 2 SOFTWARE PROJECT PLANNING 2.1 Introduction This chapter describes the domain of software project planning in order to understand its characteristics and assess what considerations

O'Connor, Rory

174

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

operate under leasing arrangements at the ETTP under the DOE Rein- dustrialization Program. LesseesEnvironmental Compliance 2-1 2. Environmental Compliance It is DOE-ORO and National Nuclear, executive orders, DOE orders (as incorporated into the op- erating contracts), and best management practices

Pennycook, Steve

175

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

at the ETTP under the DOE Rein- dustrialization Program. Lessees are accountable for complying with all facilities at the ETTP site have been leased to private entities over the past several years through the DOEEnvironmental Compliance 2-1 2. Environmental Compliance It is DOE-ORO and NNSA policy to conduct

Pennycook, Steve

176

Property:OpenEI/UtilityRate/DemandRateStructure/Tier6Adjustment | Open  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:OpenEI/UtilityRate/DemandRateStructure/Tier6Adjustment Jump to: navigation, search This is a property of type Number. Pages using the property "OpenEI/UtilityRate/DemandRateStructure/Tier6Adjustment" Showing 13 pages using this property. 4 4b524791-bef2-49b1-850b-458730755203 + 8 + 4b524791-bef2-49b1-850b-458730755203 + 8 +, 9 +, 67 +, ... 4b524791-bef2-49b1-850b-458730755203 + 9 + 4b524791-bef2-49b1-850b-458730755203 + 2 + 4b524791-bef2-49b1-850b-458730755203 + 67 + 4b524791-bef2-49b1-850b-458730755203 + 2 + 4b524791-bef2-49b1-850b-458730755203 + 89 + 4b524791-bef2-49b1-850b-458730755203 + 3 + 4b524791-bef2-49b1-850b-458730755203 + 3 + 4b524791-bef2-49b1-850b-458730755203 + 3 +

177

Stockpile Stewardship Quarterly, Volume 2, Number 1  

National Nuclear Security Administration (NNSA)

1 * May 2012 1 * May 2012 Message from the Assistant Deputy Administrator for Stockpile Stewardship, Chris Deeney Defense Programs Stockpile Stewardship in Action Volume 2, Number 1 Inside this Issue 2 LANL and ANL Complete Groundbreaking Shock Experiments at the Advanced Photon Source 3 Characterization of Activity-Size-Distribution of Nuclear Fallout 5 Modeling Mix in High-Energy-Density Plasma 6 Quality Input for Microscopic Fission Theory 8 Fiber Reinforced Composites Under Pressure: A Case Study in Non-hydrostatic Behavior in the Diamond Anvil Cell 8 Emission of Shocked Inhomogeneous Materials 9 2012 NNSA Stewardship Science Academic

178

Total Adjusted Sales of Kerosene  

U.S. Energy Information Administration (EIA) Indexed Site

End Use: Total Residential Commercial Industrial Farm All Other Period: End Use: Total Residential Commercial Industrial Farm All Other Period: Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: End Use Area 2007 2008 2009 2010 2011 2012 View History U.S. 492,702 218,736 269,010 305,508 187,656 81,102 1984-2012 East Coast (PADD 1) 353,765 159,323 198,762 237,397 142,189 63,075 1984-2012 New England (PADD 1A) 94,635 42,570 56,661 53,363 38,448 15,983 1984-2012 Connecticut 13,006 6,710 8,800 7,437 7,087 2,143 1984-2012 Maine 46,431 19,923 25,158 24,281 17,396 7,394 1984-2012 Massachusetts 7,913 3,510 5,332 6,300 2,866 1,291 1984-2012 New Hampshire 14,454 6,675 8,353 7,435 5,472 1,977 1984-2012

179

3:2:1 Crack Spread  

Gasoline and Diesel Fuel Update (EIA)

:2:1 Crack Spread :2:1 Crack Spread Figure 1 Source: U.S. Energy Information Administration, based on Thomson Reuters. A crack spread measures the difference between the purchase price of crude oil and the selling price of finished products, such as gasoline and distillate fuel, that a refinery produces from the crude oil. Crack spreads are an indicator of the short-term profit margin of oil refineries because they compare the cost of the crude oil inputs to the wholesale, or spot, prices of the outputs (although they do not include other variable costs or any fixed costs). The 3:2:1 crack spread approximates the product yield at a typical U.S. refinery: for every three barrels of crude oil the refinery processes, it makes two barrels of gasoline and one barrel of distillate

180

DOE-2 supplement: Version 2.1E  

SciTech Connect

This publication updates the DOE-2 Supplement form version 2.1D to version to 2.1E. It contains detailed discussions and instructions for using the features and enhancements introduced into the 2.1B, 2.1C, 2.1D, and 2.1E versions of the program. The building description section contains information on input functions in loads and systems, hourly report frequencies, saving files of hourly output for post processing, sharing hourly report data among program modules, the metric option, and input macros and general library features. The loads section contains information on sunspaces, sunspace modeling, window management and solar radiation, daylighting, trombe walls, fixed shades, fins and overhangs, shade schedules, self shades, heat distribution from lights, the Sherman-Grimsrud infiltrations method. terrain and height modification to wind speed, floor multipliers and interior wall types, improved exterior infrared radiation loss calculation, improved outside air film conductance calculation, window library, window frames, and switchable glazing. The systems section contains information on energy end use and meters, powered induction units, a packaged variable volume -- variable temperature system, a residential variable volume -- variable temperature system, air source heat pump enhancements, water loop heat pump enhancements, variable speed electric heat pump, gas heat pumps, hot water heaters, evaporative cooling, total gas solid-desiccant systems, add on desiccant cooling, water cooled condensers, evaporative precoolers outside air economizer control, optimum fan start, heat recovery from refrigerated case work, night ventilation, baseboard heating, moisture balance calculations, a residential natural ventilation algorithm, improved cooling coil model, system sizing and independent cooling and heating sizing ratios. The plant section contains information on energy meters, gas fired absorption chillers, engine driven compressor chillers, and ice energy storage.

Winkelmann, F.C.; Birdsall, B.E.; Buhl, W.F.; Ellington, K.L.; Erdem, A.E. [Lawrence Berkeley Lab., CA (United States); Hirsch, J.J.; Gates, S. [Hirsch (James J.) and Associates, Camarillo, CA (United States)

1993-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Optimal capacity adjustment for supply chain control  

E-Print Network (OSTI)

This research attempts to answer the questions involving the time and size of capacity adjustments for better supply chain management. The objective of this research is to analytically determine simple structures to adjust ...

Budiman, Benny S., 1969-

2004-01-01T23:59:59.000Z

182

Data:0ada1957-9e17-45f9-9171-b4e69af2b2c1 | Open Energy Information  

Open Energy Info (EERE)

ada1957-9e17-45f9-9171-b4e69af2b2c1 ada1957-9e17-45f9-9171-b4e69af2b2c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coast Electric Power Assn Effective date: 2011/04/01 End date if known: Rate name: Light Service Ornamental 175 W w/ Ornamental Pole Sector: Lighting Description: *Fixed monthly charge is the sum of fixture charge, energy charge, and pole charge. Adjustment includes power cost adjustment rider and tax expense adjustment rider Source or reference: http://www.coastepa.com/documents/Rate7H.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

183

VISAR: 2 1/2 minutes for data reduction  

Science Conference Proceedings (OSTI)

Starting with a pair of signals obtained by electronically subtracting photodetector outputs from any VISAR, it is possible to plot velocity vs time, velocity vs distance, and distance vs time in 2 1/2 min using an LSI-11/23 computer. This includes time for six iterations of time shift with the resulting polar plots and operator interactions. The velocity calculating algorithm and a flow chart of the computer program are presented.

Hemsing, W.F.

1983-01-01T23:59:59.000Z

184

Data:Af2ca0f4-1bf1-46b6-a7f0-2c8be6771338 | Open Energy Information  

Open Energy Info (EERE)

ca0f4-1bf1-46b6-a7f0-2c8be6771338 ca0f4-1bf1-46b6-a7f0-2c8be6771338 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clark Electric Coop Effective date: 2007/11/01 End date if known: Rate name: Rider 1- Power Cost Adjustment- Uncontrolled Sector: Description: Applicable to Price Schedule 58, 71,72,78,79,80,81,82,83,88,87 The Power Cost Adjustment charge shall provide for change of the price per kilowatt hour consumed to equal the average cost per kilowatt hour delivered by the utility's system. Prior to each billing cycle the Cooperative shall determine the adjustment amount to be charged for each energy unit, consumed under the rates set forth by the Cooperative. The calculation shall be:

185

1. INTRODUCTION.................................................................................................... 5 1.1 SABAP1 and SABAP2.....................................................................................................5  

E-Print Network (OSTI)

Atlasing in pentads that have uniform habitat and limited landscape features (e.g. in the Karoo or Kalahari for that area. Field Data Sheet 1 = South-Western Cape, Southern Coastal Belt & Little Karoo (Blue) Field Data Sheet 2 = West Coast and Succulent Karoo (Beige) Field Data Sheet 3 = Kalahari (White) Field Data Sheet

de Villiers, Marienne

186

Braidwood Station, Units 1 and 2  

E-Print Network (OSTI)

1, the NRC described the importance of providing advance notice of the intent to pursue license renewal. In Reference 2, Exelon Generation Company, LLC (Exelon) informed the NRC of its planned dates for submittal of license renewal applications to the NRC. Although there is no change in schedule for the submittal of Exelon License Renewal Applications, this letter provides details clarifying the information provided in Reference 2.November 19, 2012

Michael P. Gallagher; Michael P. Gallagher

2012-01-01T23:59:59.000Z

187

Method for preparing membranes with adjustable separation performance  

DOE Patents (OSTI)

Methods for adjustable separation of solutes and solvents involve the combination of the use of a maximally swollen membrane and subsequent vacuum depressurization exerted on the permeate side of that membrane. By adjusting the extent of depressurization it is possible to separate solvent from solutes and solutes from each other. Improved control of separation parameters as well as improved flux rates characterize the present invention. 2 figs.

Peterson, E.S.; Orme, C.J.; Stone, M.L.

1995-01-31T23:59:59.000Z

188

RSE Table 2.1 Relative Standard Errors for Table 2.1  

U.S. Energy Information Administration (EIA) Indexed Site

2.1 Relative Standard Errors for Table 2.1;" 2.1 Relative Standard Errors for Table 2.1;" " Unit: Percents." " "," " " "," " "NAICS"," "," ","Residual","Distillate","Natural ","LPG and",,"Coke"," " "Code(a)","Subsector and Industry","Total","Fuel Oil","Fuel Oil(b)","Gas(c)","NGL(d)","Coal","and Breeze","Other(e)" ,,"Total United States" 311,"Food",31,0,91,35,0,0,0,47 311221," Wet Corn Milling",0,0,0,0,0,0,0,0 31131," Sugar ",0,0,0,0,0,0,0,0 311421," Fruit and Vegetable Canning",1,0,0,0,0,0,0,8

189

MAGNETIC EXPERIMENTS1,2 INTRODUCTION  

E-Print Network (OSTI)

APPENDIX 47 APPENDIX MAGNETIC EXPERIMENTS1,2 INTRODUCTION As noted in the Handbook for Shipboard. It has frequently been suggested that the repeated banging of the APC bar- rel as it passes up the pipe, the core is in the magnetic field of the APC barrel and the field of the drill pipe that leaks through

190

RSE Table 1.2 Relative Standard Errors for Table 1.2  

U.S. Energy Information Administration (EIA) Indexed Site

2 Relative Standard Errors for Table 1.2;" 2 Relative Standard Errors for Table 1.2;" " Unit: Percents." " "," "," "," "," "," "," "," "," "," "," " " "," "," ",," "," ",," "," ",," ","Shipments" "NAICS"," ",,"Net","Residual","Distillate","Natural","LPG and",,"Coke and"," ","of Energy Sources" "Code(a)","Subsector and Industry","Total(b)","Electricity(c)","Fuel Oil","Fuel Oil(d)","Gas(e)","NGL(f)","Coal","Breeze","Other(g)","Produced Onsite(h)"

191

Data:2c689385-2ba7-4f2e-a2f8-4f1b0cc77f9f | Open Energy Information  

Open Energy Info (EERE)

9385-2ba7-4f2e-a2f8-4f1b0cc77f9f 9385-2ba7-4f2e-a2f8-4f1b0cc77f9f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

192

Data:1d1d2b17-5bb6-4652-a4a7-44ecba2e9b0a | Open Energy Information  

Open Energy Info (EERE)

b17-5bb6-4652-a4a7-44ecba2e9b0a b17-5bb6-4652-a4a7-44ecba2e9b0a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/01 End date if known: Rate name: Cg-2 Sector: Commercial Description: Availability Available to non-residential customers for single- or three- phase electric service. Not available for customers with a maximum demand of 25 kW or greater. Energy Cost Adjustment: Bills subject to the adjustment provided for in Energy Cost Adjustment. See Schedule X-1, Sheet No. E 63. Commercial Load Control Rider: A monthly credit is available on an optional basis for company R control of all or part of customer's load during company's interruption periods. (see Rate Sheet No. E24.50) Water Heating Meter Charge per Month per Meter $ 2.00

193

Data:0560bf8c-5d5b-4ebe-9e1b-44320349de2a | Open Energy Information  

Open Energy Info (EERE)

c-5d5b-4ebe-9e1b-44320349de2a c-5d5b-4ebe-9e1b-44320349de2a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: SMALL GENERAL TIME OF DAY SERVICE Unmetered (A18) Sector: Commercial Description: AVAILABILITY Available to any non-residential customer for single or three phase electric service supplied through one meter. DETERMINATION OF CUSTOMER BILLS Customer bills shall reflect energy charges (if applicable) based on customer's kWh usage, plus a customer charge (if applicable), plus demand charges (if applicable) based on customer's kW billing demand as defined. INTERIM RATE ADJUSTMENT A 4.49% Interim Rate Surcharge will be applied to rate components specified in the "Interim Rate Surcharge Rider." In addition, customer bills under this rate are subject to the following adjustments and/or charges. FUEL CLAUSE Bills are subject to the adjustments provided for in the Fuel Clause Rider. RESOURCE ADJUSTMENT Bills are subject to the adjustments provided for in the Conservation Improvement Program Adjustment Rider, the State Energy Policy Rate Rider, the Renewable Development Fund Rider, the Transmission Cost Recovery Rider, the Renewable Energy Standard Rider and the Mercury Cost Recovery Rider. ENVIRONMENTAL IMPROVEMENT RIDER Bills are subject to the adjustments provided for in the Environmental Improvement Rider.

194

Data:7125e1e3-d136-4ae2-9dd4-648e5014e95e | Open Energy Information  

Open Energy Info (EERE)

e3-d136-4ae2-9dd4-648e5014e95e e3-d136-4ae2-9dd4-648e5014e95e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coast Electric Power Assn Effective date: 2011/04/01 End date if known: Rate name: Outdoor Lighting Rate Sector: Lighting Description: *Available to customers of the Cooperative for approved outdoor lighting service, subject to the established rules and regulations of the Cooperative. The total capacity of outdoor lighting shall not be less than 10Kw. Adjustment includes power cost adjustment rider and tax expense adjustment rider Source or reference: http://www.coastepa.com/myHome/rateSchedules/outdoorlight.aspx

195

L(2, 1)-Labeling of Oriented Planar Graphs T. Calamoneria,1,, B. Sinaimeria,1,  

E-Print Network (OSTI)

L(2, 1)-Labeling of Oriented Planar Graphs T. Calamoneria,1,, B. Sinaimeria,1, a Department, the maximum (D), over all D C is denoted (C). In this paper we study the L(2, 1)-labeling problem on oriented planar graphs providing some upper bounds on . Then we focus on some spe- cific subclasses of oriented

Calamoneri, Tiziana

196

PN1C.EF2a  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

C.EF2a C.EF2a (.0 U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERI1 ITNATION RECIPIENT:Parker Hannifin STATE: IN PROJECI TITLE : Energy Efficient Electronics Cooling Project Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number CDP DE-EE0000412 GFO-10-043 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: B3.6 Siting, construction (or modification), operation, and decommissioning of facilities for indoor bench-scale research projects and conventional laboratory operations (for example, preparation of chemical standards and sample analysis);

197

Arkansas Crude Oil Reserves Adjustments (Million Barrels)  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1970's: 0: 1: 4: 1980's: 0: 10: 2: 23: 2-9: 5: 2: 0-3: 1990's: 1: 13-3: 20-4: 4: 9-8-1-7 ...

198

Thermodynamics of (2+1)-flavor QCD  

E-Print Network (OSTI)

We report on the status of our QCD thermodynamics project. It is performed on the QCDOC machine at Brookhaven National Laboratory and the APEnext machine at Bielefeld University. Using a 2+1 flavor formulation of QCD at almost realistic quark masses we calculated several thermodynamical quantities. In this proceeding we show the susceptibilites of the chiral condensate and the Polyakov loop, the static quark potential and the spatial string tension.

C. Schmidt; T. Umeda

2006-09-21T23:59:59.000Z

199

THERMODYNAMICS OF (2+1)-FLAVOR QCD.  

SciTech Connect

We report on the status of our QCD thermodynamics project. It is performed on the QCDOC machine at Brookhaven National Laboratory and the APEnext machine at Bielefeld University. Using a 2 + 1 flavor formulation of QCD at almost realistic quark masses we calculated several thermodynamical quantities. In this proceeding we show the susceptibilities of the chiral condensate and the Polyakov loop, the static quark potential and the spatial string tension.

SCHMIDT, C.; UMEDA, T.

2006-10-10T23:59:59.000Z

200

Book2.xls?attach=1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Units 1&2 Off, Units 3,4,5 on 12 hrs @ 100% load and 12 hrs at 35% load. (100% load = 107 MW). Units 1&2 Off, Units 3,4,5 on 12 hrs @ 100% load and 12 hrs at 35% load. (100% load = 107 MW). SO2 = 0.22 lb/MBtu on all three units. Run 0600 - 1800 at 100% load, and the rest at 35% load on all units. AERMOD- PRIME Monitored Background AERMOD-PRIME + Background NAAQS Distance Direction Ground Elevation Flagpole Elevation X (m) Y (m) m deg m m 3-hour 720 238.4 958 1300 322787.7 4298786.0 174.8 354 4.6 39.6 24-hour 442 53.0 495 365 322787.7 4298786.0 174.8 354 4.6 39.6 Annual 61 15.7 77 80 322787.7 4298786.0 174.8 354 4.6 39.6 3-hour 852 238.4 1,090 1300 322787.7 4298786.0 174.8 354 4.6 39.6 24-hour 417 53.0 470 365 322787.7 4298786.0 174.8 354 4.6 39.6 Annual 69 15.7 84 80 322787.7 4298786.0 174.8 354 4.6 39.6 3-hour 784 238.4 1,022 1300 322787.7 4298786.0 174.8 354 4.6 39.6 24-hour 391 53.0 444 365 322787.7 4298786.0 174.8 354 4.6 39.6

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ESH100.1.EP.2  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Procedure Title Implement NEPA, Cultural Resources, and Historic Properties Requirements Procedure Manager COOPER, TERRY W. Status Active Subject Matter Expert Joseph M. Bonaguidi (Joe) Barbara L. Larsen-SNL/CA Applicability, Exceptions, and Consequences This corporate procedure applies to all SNL organizations, all management elements, all SNL sites, all Members of the Workforce, and all SNL activities on private and government properties, as well as international settings. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or

202

(front end fuel cycle) 2.1 (CANDU  

E-Print Network (OSTI)

2 (front end fuel cycle) 2.1 (CANDU: CANada Deuterium Uranium; . ( 2.2) . 70-80% , (uranium concentrate) . () 2.1 . 2.2 2.3 #12; 2; . Mine Car Load Skip Geiger Counter 8"~3/2"" . (2

Hong, Deog Ki

203

Data:9a69b524-1e13-4c50-a2f9-2dcfbad300ff | Open Energy Information  

Open Energy Info (EERE)

9b524-1e13-4c50-a2f9-2dcfbad300ff 9b524-1e13-4c50-a2f9-2dcfbad300ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Interruptible Service-Three Phase Sector: Industrial Description: *Applicable for general service customers for commercial ,business,professional and industrial loads in excess of 10KW. Subject to tax and wholesale power cost adjustments. Source or reference: http://www.trico.coop/images/TRICO_IS1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

204

Data:07460713-1c57-417b-b2e5-b3d867141623 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:07460713-1c57-417b-b2e5-b3d867141623 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: ENERGY CONTROLLED SERVICE (NON-DEMAND METERED) Commercial & Industrial (A05) Sector: Commercial Description: Available to residential and commercial customers with permanently connected interruptible loads of up to 50 kW that would be under Company control. The types of loads served would include dual fuel space heating, water heating, and other loads subject to Company approval. DETERMINATION OF CUSTOMER BILLS Customer bills shall reflect energy charges (if applicable) based on customer's kWh usage, plus a customer charge (if applicable), plus demand charges (if applicable) based on customer's kW billing demand as defined. OPTIONAL ENERGY CHARGE This option is available to customers with heat pump installations for non-interruptible service during June through September billing months. PLEASE SEE REFERENCE FOR MORE INFORMATION ON THE OPTIONAL ENERGY CHARGES. INTERIM RATE ADJUSTMENT A 4.49% Interim Rate Surcharge will be applied to rate components specified in the "Interim Rate Surcharge Rider." In addition, customer bills under this rate are subject to the following adjustments and/or charges. FUEL CLAUSE Bills are subject to the adjustments provided for in the Fuel Clause Rider. RESOURCE ADJUSTMENT Bills are subject to the adjustments provided for in the Conservation Improvement Program Adjustment Rider, the State Energy Policy Rate Rider, the Renewable Development Fund Rider, the Transmission Cost Recovery Rider, the Renewable Energy Standard Rider and the Mercury Cost Recovery Rider. ENVIRONMENTAL IMPROVEMENT RIDER Bills are subject to the adjustments provided for in the Environmental Improvement Rider.

205

Data:5b350833-ce2d-4fe1-b1c3-5854b408ce5f | Open Energy Information  

Open Energy Info (EERE)

b350833-ce2d-4fe1-b1c3-5854b408ce5f b350833-ce2d-4fe1-b1c3-5854b408ce5f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Primary Metering Discount (2,300-15,000 volts) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

206

Data:D8bd11b2-4e1b-421a-b4c0-1b6e22a7fbb2 | Open Energy Information  

Open Energy Info (EERE)

b2-4e1b-421a-b4c0-1b6e22a7fbb2 b2-4e1b-421a-b4c0-1b6e22a7fbb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Customer Furnished Investment 400 Watt HPS Sector: Lighting Description: * Available under written contract with municipalities or government authorities for the purpose of lighting highways, streets, and other areas Service is available subject to the Cooperative's Terms and conditions on file with the Oklahoma Corporation Commission. Subject to tax adjustment. Source or reference: Rate binder # 4

207

Data:Ece1b242-4cbc-41e8-b722-e2df1f672bf8 | Open Energy Information  

Open Energy Info (EERE)

Ece1b242-4cbc-41e8-b722-e2df1f672bf8 Ece1b242-4cbc-41e8-b722-e2df1f672bf8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand 9am-9pm Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 1,000kW for 3 months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

208

Data:2b904167-797d-4c3a-a816-2804a2c2bda1 | Open Energy Information  

Open Energy Info (EERE)

-797d-4c3a-a816-2804a2c2bda1 -797d-4c3a-a816-2804a2c2bda1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Benton, Wisconsin (Utility Company) Effective date: 2007/08/17 End date if known: Rate name: Ms-1 General Lighting Service: Overhead 175 W MV Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month. Power Cost Adjustment Clause: Charge per all kWh varies monthly Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=460

209

Data:Bfd3b4df-2f33-4bed-8547-1f49af5b1a23 | Open Energy Information  

Open Energy Info (EERE)

Bfd3b4df-2f33-4bed-8547-1f49af5b1a23 Bfd3b4df-2f33-4bed-8547-1f49af5b1a23 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Single Phase 7am-7pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

210

Data:7dbbec2e-167d-4d35-a937-efeb1cd1d5f0 | Open Energy Information  

Open Energy Info (EERE)

dbbec2e-167d-4d35-a937-efeb1cd1d5f0 dbbec2e-167d-4d35-a937-efeb1cd1d5f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Cp-2 Large Power Optional 12-hr On-Peak Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

211

Data:47d9ee95-1ece-406d-9163-2c3a6bc1b3ac | Open Energy Information  

Open Energy Info (EERE)

5-1ece-406d-9163-2c3a6bc1b3ac 5-1ece-406d-9163-2c3a6bc1b3ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand 7am-9pm Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour.

212

Data:192221c4-1a88-4d4e-a2c1-0bd4700434de | Open Energy Information  

Open Energy Info (EERE)

-1a88-4d4e-a2c1-0bd4700434de -1a88-4d4e-a2c1-0bd4700434de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

213

Data:057bd1f0-cec2-48f5-93db-7dd4c7cfeba1 | Open Energy Information  

Open Energy Info (EERE)

bd1f0-cec2-48f5-93db-7dd4c7cfeba1 bd1f0-cec2-48f5-93db-7dd4c7cfeba1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

214

Data:A9ed71fd-c3cc-4980-b1b2-cc4a4e1a7014 | Open Energy Information  

Open Energy Info (EERE)

ed71fd-c3cc-4980-b1b2-cc4a4e1a7014 ed71fd-c3cc-4980-b1b2-cc4a4e1a7014 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

215

Data:D3bf1d1b-d641-4478-a65a-791fe2d33a7c | Open Energy Information  

Open Energy Info (EERE)

bf1d1b-d641-4478-a65a-791fe2d33a7c bf1d1b-d641-4478-a65a-791fe2d33a7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Primary Metering Discount with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

216

Data:1d18e681-b3b1-4f2d-b2fd-e431b964f861 | Open Energy Information  

Open Energy Info (EERE)

1-b3b1-4f2d-b2fd-e431b964f861 1-b3b1-4f2d-b2fd-e431b964f861 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northwestern Rural E C A, Inc Effective date: 2013/01/01 End date if known: Rate name: Single-Phase Service - Time of Use Sector: Residential Description: AVAILABILITY This rate applies to single-phase service requiring a 50 KVA or less transformer that is also a full-time residential service on the Residential (RESD1) rate schedule, subject to the established rules and regulations, where electricity is the primary source of heating/cooling and an electric water heater approved by the Cooperative is used for domestic water heating. This rate is not available to service for single-phase motors in excess of 10 HP or tankless or instant water heaters. GENERATION COST ADJUSTMENT: The charge(s) for generation service shall be increased or decreased in accordance with the Cooperative's Generation Cost Adjustment Clause, Schedule "GCA".

217

Data:2364aa67-a2c1-4a4a-8a36-764898e1eedd | Open Energy Information  

Open Energy Info (EERE)

aa67-a2c1-4a4a-8a36-764898e1eedd aa67-a2c1-4a4a-8a36-764898e1eedd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

218

Data:9fb476d1-e2ff-4f0d-8e2d-254c5b038fc2 | Open Energy Information  

Open Energy Info (EERE)

d1-e2ff-4f0d-8e2d-254c5b038fc2 d1-e2ff-4f0d-8e2d-254c5b038fc2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Piedmont Electric Member Corp Effective date: 2012/05/01 End date if known: Rate name: RESIDENTIAL SERVICE - ENERGY STAR All- Electric Three Phase Sector: Residential Description: Applicability: Service under this Schedule is applicable to all residential consumers whose residence is in compliance with the Energy Star standards. REPS CHARGE: Residential $ 0.35 INCLUDED IN FIXED MONTHLY CHARGE This rate is also subject to Wholesale Power Cost Adjustments, the Energy Efficiency Rider, as well as any applicable sales taxes imposed by any governmental authority.

219

Data:6dc53582-4218-4f2b-bd2f-fd1f006dcee3 | Open Energy Information  

Open Energy Info (EERE)

-4218-4f2b-bd2f-fd1f006dcee3 -4218-4f2b-bd2f-fd1f006dcee3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Street Lighting HPS 150w Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting. The Purchase Cost Adjustment Clause, a charge per all kWh that varies monthly, applies to this rate. Source or reference: http://www.wrwwlc.com/StreetYard.aspx Source Parent: Comments Applicability Demand (kW)

220

Data:8aa5bbd2-7ffd-4329-814b-b04e1d704ab2 | Open Energy Information  

Open Energy Info (EERE)

bbd2-7ffd-4329-814b-b04e1d704ab2 bbd2-7ffd-4329-814b-b04e1d704ab2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Liberty, Texas (Utility Company) Effective date: End date if known: Rate name: Large Commercial Sector: Commercial Description: *Subject to fuel cost adjustment. Note: Demand Decimal Figure and Multiplier can be obtained from the Utility Billing Department. The demand charge is based on the multiplier on the account. The Total Demand Factor is calculated as follows: Demand Decimal Figure x Multiplier - 15 x $6.24 Source or reference: http://www.cityofliberty.org/Departments/Finance/Billing_Rates/Electrical_Service_Rates.aspx

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:9bf6bbb2-3651-48f0-afca-2ce6974c1fa3 | Open Energy Information  

Open Energy Info (EERE)

bbb2-3651-48f0-afca-2ce6974c1fa3 bbb2-3651-48f0-afca-2ce6974c1fa3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: Street and Highway Lighting 200w Sodium Vapor Sector: Lighting Description: Monthly Charge: Includes energy costs only, with the Customer having paid the installation costs and the periodic maintenance costs. Contract Options: For services beyond energy only, the PUD offers standard contracts for maintenance and contracts to finance Customer's street lighting installations. All applicable BPA Power Cost Adjustment charges per Rate Schedule 94 shall apply to all kWh's billed to Customers under this Rate Schedule.

222

Data:Eafcb0b2-ebf0-4603-849a-2fb67c1f8214 | Open Energy Information  

Open Energy Info (EERE)

Eafcb0b2-ebf0-4603-849a-2fb67c1f8214 Eafcb0b2-ebf0-4603-849a-2fb67c1f8214 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service between 1,000kW and 5,000 kW Demand 7am-9pm Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

223

Data:62aa16b1-c34c-4b5b-8070-2e2cf8dd61bf | Open Energy Information  

Open Energy Info (EERE)

6b1-c34c-4b5b-8070-2e2cf8dd61bf 6b1-c34c-4b5b-8070-2e2cf8dd61bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Juneau Utility Comm Effective date: 2010/07/15 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand 8am-8pm Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

224

Data:8b38164f-97e2-45c0-b0b1-eeef35c70b2c | Open Energy Information  

Open Energy Info (EERE)

f-97e2-45c0-b0b1-eeef35c70b2c f-97e2-45c0-b0b1-eeef35c70b2c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: La Farge Municipal Electric Co Effective date: 2009/03/20 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 175 MV Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0551 per kilowatt-hour.

225

Data:545cd2ce-58ec-4270-a1f2-e4c583e54004 | Open Energy Information  

Open Energy Info (EERE)

cd2ce-58ec-4270-a1f2-e4c583e54004 cd2ce-58ec-4270-a1f2-e4c583e54004 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2011/08/12 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Ornamental 250 W MH (Single Head Facilitity) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

226

Data:A087e59e-2a40-4127-8a1a-2a838d4b347f | Open Energy Information  

Open Energy Info (EERE)

e59e-2a40-4127-8a1a-2a838d4b347f e59e-2a40-4127-8a1a-2a838d4b347f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-1 Small Power Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

227

Data:0fea1e9c-4ae6-48ef-8dc8-f2b70d2a3728 | Open Energy Information  

Open Energy Info (EERE)

fea1e9c-4ae6-48ef-8dc8-f2b70d2a3728 fea1e9c-4ae6-48ef-8dc8-f2b70d2a3728 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

228

Data:8bbec13b-1bf2-4009-ab38-dda5b8d2ebaa | Open Energy Information  

Open Energy Info (EERE)

bbec13b-1bf2-4009-ab38-dda5b8d2ebaa bbec13b-1bf2-4009-ab38-dda5b8d2ebaa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day 9am-9pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

229

Data:26ea050f-d2c3-4162-93bd-1ff8bdca09a2 | Open Energy Information  

Open Energy Info (EERE)

50f-d2c3-4162-93bd-1ff8bdca09a2 50f-d2c3-4162-93bd-1ff8bdca09a2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Gs-2 Urban General Service Single Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

230

Data:F344f0f2-403a-496b-ada2-58f1dc6b8504 | Open Energy Information  

Open Energy Info (EERE)

f2-403a-496b-ada2-58f1dc6b8504 f2-403a-496b-ada2-58f1dc6b8504 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

231

Data:Dfc73905-2f20-4376-a879-1f621c1fed93 | Open Energy Information  

Open Energy Info (EERE)

Dfc73905-2f20-4376-a879-1f621c1fed93 Dfc73905-2f20-4376-a879-1f621c1fed93 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service(<6000 volts) Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

232

Data:766319b1-e8ca-4bc5-b8a2-1bbf3eba658c | Open Energy Information  

Open Energy Info (EERE)

b1-e8ca-4bc5-b8a2-1bbf3eba658c b1-e8ca-4bc5-b8a2-1bbf3eba658c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

233

Magnetically Coupled Adjustable Speed Drive Systems  

DOE Green Energy (OSTI)

Adjustable speed drive (ASD) technologies have the ability to precisely control motor sytems output and produce a numbr of benefits including energy and demand savings. This report examines the performance and cost effectiveness of a specific class of ASDs called magnetically-coupled adjustable speed drives (MC-ASD) which use the strength of a magnetic field to control the amount of torque transferred between motor and drive shaft. The MagnaDrive Adjustable Speed Coupling System uses fixed rare-earth magnets and varies the distance between rotating plates in the assembly. the PAYBACK Variable Speed Drive uses an electromagnet to control the speed of the drive

Chvala, William D.; Winiarski, David W.

2002-08-18T23:59:59.000Z

234

WTC1, 2, 7 Fire Alarm Analysis  

Science Conference Proceedings (OSTI)

... Lobby 6 Cars Typically - 1 SSD 1 Car - Typically C LADIES FA 17 A Installed with Recall ... Ceiling mounted round speakers, 70 volt (SPK-9070) ...

235

On the nonexistence of $[\\binom{2m}{m-1}, 2m, \\binom{2m-1}{m-1}]$, $m$ odd, complex orthogonal design  

E-Print Network (OSTI)

Complex orthogonal designs (CODs) are used to construct space-time block codes. COD $\\mathcal{O}_z$ with parameter $[p, n, k]$ is a $p\\times n$ matrix, where nonzero entries are filled by $\\pm z_i$ or $\\pm z^*_i$, $i = 1, 2,..., k$, such that $\\mathcal{O}^H_z \\mathcal{O}_z = (|z_1|^2+|z_2|^2+...+|z_k|^2)I_{n \\times n}$. Adams et al. in "The final case of the decoding delay problem for maximum rate complex orthogonal designs," IEEE Trans. Inf. Theory, vol. 56, no. 1, pp. 103-122, Jan. 2010, first proved the nonexistence of $[\\binom{2m}{m-1}, 2m, \\binom{2m-1}{m-1}]$, $m$ odd, COD. Combining with the previous result that decoding delay should be an integer multiple of $\\binom{2m}{m-1}$, they solved the final case $n \\equiv 2 \\pmod 4$ of the decoding delay problem for maximum rate complex orthogonal designs. In this paper, we give another proof of the nonexistence of COD with parameter $[\\binom{2m}{m-1}, 2m, \\binom{2m-1}{m-1}]$, $m$ odd. Our new proof is based on the uniqueness of $[\\binom{2m}{m-1}, 2m-1, \\binom{...

Li, Yuan

2011-01-01T23:59:59.000Z

236

Data:27b7daa5-0505-44f2-9ab7-eca68101fed1 | Open Energy Information  

Open Energy Info (EERE)

daa5-0505-44f2-9ab7-eca68101fed1 daa5-0505-44f2-9ab7-eca68101fed1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 150 W HPS Non-Utility purchased Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

237

Data:59f453dd-aca7-41d1-8563-9d526ae2c344 | Open Energy Information  

Open Energy Info (EERE)

aca7-41d1-8563-9d526ae2c344 aca7-41d1-8563-9d526ae2c344 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Large Power 1 W/5% -Rate 17 Sector: Industrial Description: - Available to industrial power customers using service under term contract for lighting,motive and heating purposes. - Subject to Power cost adjustment, Tax adjustment and Rate revisions. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

238

Data:B1b36c2c-1417-49a9-84de-cae935fd41c0 | Open Energy Information  

Open Energy Info (EERE)

c2c-1417-49a9-84de-cae935fd41c0 c2c-1417-49a9-84de-cae935fd41c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cimarron Electric Coop Effective date: 2002/02/01 End date if known: Rate name: Mercury Vapor Light - 175W Sector: Lighting Description: Available to all consumers of the Cooperative receiving service under any other retail rate schedule. Source or reference: ISU Documentation Source Parent: Comments Billing Adjustments: PCA (Based on 70 per kWh per light) and Tax Adjustment (Reference Sheet No.1) Each additional pole is $2.15 per month and buried cables cost an extra $1.5 per month.

239

Data:Bd92fc93-1a25-4aee-97d2-fb0c2b8d342e | Open Energy Information  

Open Energy Info (EERE)

Bd92fc93-1a25-4aee-97d2-fb0c2b8d342e Bd92fc93-1a25-4aee-97d2-fb0c2b8d342e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: Residential- Three-Phase Sector: Residential Description: This rate will be applied to residential single-phase or three-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. This following Riders and Adjustments are applicable to this rate: Power Cost Adjustment Clause Renewable Energy Rider Commitment to Community Program Rider which sets a fee of 3.0% of the total electric bill, not to exceed $0.87.

240

Data:770b1a2d-0e5a-4be7-92fd-102fe99c2f87 | Open Energy Information  

Open Energy Info (EERE)

b1a2d-0e5a-4be7-92fd-102fe99c2f87 b1a2d-0e5a-4be7-92fd-102fe99c2f87 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of River Falls, Wisconsin (Utility Company) Effective date: 2008/04/11 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0662 per kilowatt-hour.

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Energy Emergency Preparedness Quarterly Vol 2, Issue 1 - January...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, Issue 1 - January 2013 Energy Emergency Preparedness Quarterly Vol 2, Issue 1 - January 2013 The Energy Emergency Preparedness Quarterly is published by the Infrastructure...

242

Alternative Fuel News Volume 2 Number 1  

NLE Websites -- All DOE Office Websites (Extended Search)

Vol. 2 - No. 1 ALTERNATIVE FUEL NEWS U. S. D E P A R T M E N T o f E N E R G Y The Official Publication of the Clean Cities Network and the Alternative Fuels Data Center Kyoto Protocol Kyoto Protocol "What Does It Mean?" "What Does It Mean?" Contribute Your Comments on the Upcoming Rulemaking Auto Shows Were a Hit for the AFV Industry GSA Helps Federal Fleets Acquire AFVs Inside: DOE Seeks Input on E85 Action Plan NT Y A U E O F E N E R G D E P A R T M E N I T E D S T A T S O F A E R I C M iving in Washington, DC, it seems like each week brings a new, major question, challenge, or problem for the President, Congress, or the "American people" to address, debate, or solve. Skimming through the newspaper reveals the need to revise the tax code, balance the budget, and improve health

243

Table 2.1d Industrial Sector Energy Consumption Estimates ...  

U.S. Energy Information Administration (EIA)

Table 2.1d Industrial Sector Energy Consumption Estimates, 1949-2011 (Trillion Btu) Year: Primary Consumption 1: Electricity

244

Table 2.1e Transportation Sector Energy Consumption Estimates ...  

U.S. Energy Information Administration (EIA)

Table 2.1e Transportation Sector Energy Consumption Estimates, 1949-2011 (Trillion Btu) Year: Primary Consumption 1: Electricity

245

Data:C61ce07d-8da1-45d6-b1b1-0b2da3533e6b | Open Energy Information  

Open Energy Info (EERE)

1ce07d-8da1-45d6-b1b1-0b2da3533e6b 1ce07d-8da1-45d6-b1b1-0b2da3533e6b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Guntersville Electric Board Effective date: 2012/10/01 End date if known: Rate name: SDE SMSD Sector: Commercial Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments *Subject to revenue adjustment,environmental adjustment and FCA Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

246

Transilient Turbulence Theory. Part II: Turbulent Adjustment  

Science Conference Proceedings (OSTI)

Turbulent adjustment is a scheme where dynamic instabilities in the flow are eliminated by turbulence. It is a form of first-order turbulence closure that is applicable to numerical forecast models of the atmosphere. The responsive form of ...

Roland B. Stull; Takehiko Hasegawa

1984-12-01T23:59:59.000Z

247

Nonlinear Atmospheric Adjustment to Thermal Forcing  

Science Conference Proceedings (OSTI)

A nonlinear, numerical model of a compressible atmosphere is used to simulate the hydrostatic and geostrophic adjustment to a localized prescribed heating applied over five minutes with a size characteristic of an isolated, deep, cumulus cloud. ...

Paul F. Fanelli; Peter R. Bannon

2005-12-01T23:59:59.000Z

248

Hydrostatic Adjustment in Nonhydrostatic, Compressible Mesoscale Models  

Science Conference Proceedings (OSTI)

The ability of various numerical techniques used in compressible, nonhydrostatic models to handlehydrostatic adjustment is intercompared. The exact solution of a linearized model of an isothermal, compressible, nonrotating atmosphere is compared ...

Dean G. Duffy

1997-12-01T23:59:59.000Z

249

Geostrophic Adjustment: Frontogenesis and Energy Conversion  

Science Conference Proceedings (OSTI)

Nonlinear geostrophic adjustment is examined with a Boussinesq model. The motion is restricted to a two-dimensional channel in the horizontal and vertical (x, z) plane; the fluid is in uniform rotation, is stably stratified, inviscid, and ...

William Blumen; Rongsheng Wu

1995-03-01T23:59:59.000Z

250

Microeconomic Inventory Adjustment and Aggregate Dynamics  

E-Print Network (OSTI)

We examine microeconomic and aggregate inventory dynamics in the business sector of the U.S. economy. We employ high-frequency ...rm-level data and use an empirically tractable model, in which the aggregate dynamics are derived explicitly from the underlying microeconomic data. Our results show that the microeconomic adjustment function in both the manufacturing and trade sectors is nonlinear and asymmetric, results consistent with ...rms using (S; s)-type inventory policies. There are dierences in the estimated adjustment functions between the two sectors as well as the durable and nondurable goods ...rms within each sector. The estimated adjustment function is remarkably stable across subperiods, indicating little change in the inventory adjustment process over time. As predicted by our model, higher moments of the cross-sectional distribution of inventory deviations aect aggregate inventory dynamics. Both authors are aliated with the Research Department, Federal Reserve...

Jonathan Mccarthy; Egon Zakrajsek; We Thank Palle Andersen; Andy Caplin; Mark Gertler; John Haltiwanger; Jim Harrigan; Brad Humphreys; Spence Krane; Trish Mosser; Simon Potter; Tom Sargent

1998-01-01T23:59:59.000Z

251

Data:2833f3b3-9bb4-4574-a97e-2f4c557f1f44 | Open Energy Information  

Open Energy Info (EERE)

f3b3-9bb4-4574-a97e-2f4c557f1f44 f3b3-9bb4-4574-a97e-2f4c557f1f44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1996/05/02 End date if known: Rate name: Commercial Time of Use (Three-Phase), Schedule TOU-C Sector: Commercial Description: Business, industrial and non-residential service. Minimum Charge shall be the highest of: (a) Customer Charge of 15.00; or (b) As prescribed by the line extension policy of the rules and regulations of the Cooperative Subject to Power Cost Adjustment and Tax Adjustment Subject to Power Cost Adjustment and Tax Adjustment

252

Data:Eb529144-200c-47c2-b99b-1e3c57be824e | Open Energy Information  

Open Energy Info (EERE)

Eb529144-200c-47c2-b99b-1e3c57be824e Eb529144-200c-47c2-b99b-1e3c57be824e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Avilla, Indiana (Utility Company) Effective date: 2002/04/01 End date if known: Rate name: Rate RS Sector: Residential Description: "The Rate Adjustment applicable to the included rate schedules shall be $(.0001672) per kWh used per month. The rate is embedded in the base kilowatt hour charge." This rate is also subject to the Fuel Cost Adjustment. "Fuel Cost Adjustment: The fuel cost adjustment in dollars per kilowatt hour shall be the same as that most recently billed to the Avilla Municipal Electric Utility by its purchased power supplier."

253

Data:1e1f9ffd-40c4-47a2-a28a-41346247c3cd | Open Energy Information  

Open Energy Info (EERE)

e1f9ffd-40c4-47a2-a28a-41346247c3cd e1f9ffd-40c4-47a2-a28a-41346247c3cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Gs-1 General Service Three Phase less than 40kW Demand Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

254

Data:1cf4c295-a7b7-4047-8270-b4c2c8585ea1 | Open Energy Information  

Open Energy Info (EERE)

5-a7b7-4047-8270-b4c2c8585ea1 5-a7b7-4047-8270-b4c2c8585ea1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 7am-9pm Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

255

Data:Afb2f257-d88b-4d11-b2ed-a81722a0ce1d | Open Energy Information  

Open Energy Info (EERE)

7-d88b-4d11-b2ed-a81722a0ce1d 7-d88b-4d11-b2ed-a81722a0ce1d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Juneau Utility Comm Effective date: 2010/07/15 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand 8am-8pm Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

256

Data:5a2c01e6-2bbb-4f5e-91e1-78a4d71232fc | Open Energy Information  

Open Energy Info (EERE)

e6-2bbb-4f5e-91e1-78a4d71232fc e6-2bbb-4f5e-91e1-78a4d71232fc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Ms-1 Lighting Services Crosswalk Flashers (unmetered) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

257

Data:Ec2b2154-02c2-45d5-ad17-1dd104a941be | Open Energy Information  

Open Energy Info (EERE)

54-02c2-45d5-ad17-1dd104a941be 54-02c2-45d5-ad17-1dd104a941be No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 7am-9pm Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

258

Data:38bc9e6b-09c1-4b7a-9645-2a4d969e1ef1 | Open Energy Information  

Open Energy Info (EERE)

e6b-09c1-4b7a-9645-2a4d969e1ef1 e6b-09c1-4b7a-9645-2a4d969e1ef1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Evansville, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-3 Industrial Power TOD Service above 1,000kW Primary Metering Discount with Parallel Generation(20 kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0762 per kilowatt-hour.

259

A high pressure, high temperature study of 1,1-diamino-2,2-dinitro ethylene  

SciTech Connect

We report a synchrotron energy-dispersive X-ray diffraction study of the novel high explosive 1,1-diamino-2,2-dinitroethylene at high pressures and high temperatures. Pressure was generated using a Paris-Edinburgh cell to employ larger sample volumes. High temperatures were created using a resistive graphite cylinder surrounding the sample. The PT phase diagram was explored in the 3.3 GPa pressure range and in the {approx} 400 C temperature range. We believe that the sample commenced in the {alpha}-phase and then ended up in an amorphous phase when the temperature increased beyond 280 C near 2 GPa, which we believe to be the {gamma}-phase. Further pressure and temperature cycling suggests that the sample transformed reversibly into and out of the amorphous phase near the phase line.

Pravica, Michael; Galley, Martin; Park, Changyong; Ruiz, Harrison; Wojno, Jennifer (UNLV); (CIW)

2012-08-29T23:59:59.000Z

260

USING DOE-2.1 AT LAWRENCE BERKELEY LABORATORY  

E-Print Network (OSTI)

2.1 Documents DOE-2 Reference Manual LBL Documents HandbookDOE-2 BDL Summary Users Guide Sample Run Book Engineering Manual LBL Documents Handbook

Authors, Various

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data:82bc8ea2-8b5c-4fec-a440-32b1c2a7ada9 | Open Energy Information  

Open Energy Info (EERE)

8b5c-4fec-a440-32b1c2a7ada9 8b5c-4fec-a440-32b1c2a7ada9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1996/05/02 End date if known: Rate name: Pumping Time of Use (Three-Phase), Schedule TOU-P Sector: Commercial Description: Business and industrial pumping service. Minimum Charge shall be the highest of: (a) Customer Charge of 15.00; or (b) As prescribed by the line extension policy of the rules and regulations of the Cooperative Subject to Power Cost Adjustment and Tax Adjustment Source or reference: Rates Binder B #4 Source Parent:

262

Data:62f0dfc1-cc60-46bc-9e56-e7b425b2e149 | Open Energy Information  

Open Energy Info (EERE)

dfc1-cc60-46bc-9e56-e7b425b2e149 dfc1-cc60-46bc-9e56-e7b425b2e149 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cotton Electric Coop, Inc Effective date: 2010/02/01 End date if known: Rate name: Commercial Service High Density-Three Phase Sector: Commercial Description: * Available for commercial customers up to 50 kVA of transformer capacity. Further capacity available at the discretion of the Cooperative, up to 150 kVA. Subject to power cost adjustment and tax adjustment Source or reference: ISU Documentation Rate Binder Kelly # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

263

Data:E907833b-3bd7-47a8-8e2b-333c06c490d1 | Open Energy Information  

Open Energy Info (EERE)

3bd7-47a8-8e2b-333c06c490d1 3bd7-47a8-8e2b-333c06c490d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: Street Lighting- 150W HPS Sector: Lighting Description: This schedule will be applied to municipal street lighting and private area lighting. The utility will furnish, install, and maintain lighting units. This rate is subject to a Power Cost Adjustment, which is a charge per all kWh that varies monthly. The Commitment to Community Program Rider fee is denoted in the Flat Rate Adjustments Field.

264

Adjusting External Doses from the ORNL and Y-12 Facilities for the Oak Ridge Nuclear Facilities Mortality Study  

NLE Websites -- All DOE Office Websites (Extended Search)

Adjusting External Doses from the ORNL and Y-12 Adjusting External Doses from the ORNL and Y-12 Facilities for the Oak Ridge Nuclear Facilities Mortality Study A Supplemental Report to Data Collection, Validation, and Description for the Oak Ridge Nuclear Facilities Mortality Study J. P. Watkins (1), D. L. Cragle (1), E. L. Frome (2), C. M. West (1), D. J. Crawford- Brown (3), and W. G. Tankersley (1) (1) Oak Ridge Institute for Science and Education, Environmental and Health Sciences Division, Center for Epidemiologic Research, Oak Ridge, TN 37831-0117. (2) Oak Ridge National Laboratory, Oak Ridge, TN 37830. (3) School of Public Health, University of North Carolina, Chapel Hill, NC 27599-7400. This report concerns work undertaken as part of the Health and Mortality Study of Department of

265

Data:80f6faa2-4ee1-4844-9b77-43ca78f2e541 | Open Energy Information  

Open Energy Info (EERE)

-4ee1-4844-9b77-43ca78f2e541 -4ee1-4844-9b77-43ca78f2e541 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Street Lighting- 400W HPS- Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. The lighting pole charge applies if the lamp is on a dedicated pole that is not used to support the utility distribution system. Pole Charge: $3.00 per pole, per month. The Power Cost Adjustment Clause applies to this rate.

266

Data:1a53e593-1cba-46bf-bd2d-7464dc7e9dce | Open Energy Information  

Open Energy Info (EERE)

e593-1cba-46bf-bd2d-7464dc7e9dce e593-1cba-46bf-bd2d-7464dc7e9dce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service(<6000 volts) Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

267

DOE-2 basics version 2.1E  

Science Conference Proceedings (OSTI)

DOE-2 is an up-to-date, unbiased, well-documented public-domain computer program for building energy analysis. DOE-2 predicts the hourly energy use and energy cost of a building given hourly weather information and a description of the building and its HVAC equipment and utility rate structure. DOE-2 is a portable FORTRAN program that can be used on a large variety of computers, including PC`s. Using DOE-2, designers can determine the choice of building parameters that improve energy efficiency while maintaining thermal comfort. The purpose of DOE-2 is to aid in the analysis of energy usage in buildings; it is not intended to be the sole source of information relied upon for the design of buildings. The judgment and experience of the architect/engineer still remain the most important elements of building design.

Birdsall, B.E.; Buhl, W.F.; Ellington, K.L.; Erdem, A.E.; Winkelmann, F.C. [Lawrence Berkeley Lab., CA (United States); Hirsch, J.J.; Gates, S. [Hirsch and Associates, Camarillo, CA (United States)

1994-05-01T23:59:59.000Z

268

1.3. Learning OOF2  

Science Conference Proceedings (OSTI)

... The tutorials cover all of the OOF2 basics by ... introducing the features of the Tutorial window, and then ... to bring up all the major windows, and points ...

2013-07-05T23:59:59.000Z

269

Data:27bf9e2d-97c2-4026-a8d1-39c4a9d90475 | Open Energy Information  

Open Energy Info (EERE)

d-97c2-4026-a8d1-39c4a9d90475 d-97c2-4026-a8d1-39c4a9d90475 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Commercial General Service Demand T.O.U. Primary Metering/Ownership Sector: Commercial Description: *Applicable to any customer who has demand exceeding 100 kW for three consecutive months and has the ability to shed a minimum of 50 kW during seasonal peak demand. Subject to production cost adjustment and power factor adjustment. 3.5% reduction in bill for primary metering and ownership/maintenance of transformation equipment.

270

Data:Ad1f0f1e-b0d2-4cb3-bee4-b7a788487c8e | Open Energy Information  

Open Energy Info (EERE)

e-b0d2-4cb3-bee4-b7a788487c8e e-b0d2-4cb3-bee4-b7a788487c8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northwestern Rural E C A, Inc Effective date: 2013/01/01 End date if known: Rate name: OFFP 3 - Interruptible / Off - Peak Space Heating Sector: Residential Description: AVAILABILITY All Single-Phase (RESD 1) consumers utilizing electricity for space heating. GENERATION COST ADJUSTMENT The charge(s) for generation service shall be increased or decreased in accordance with the Cooperative's Generation Cost Adjustment Clause, Schedule "GCA". Source or reference: http://www.northwesternrec.com/myHome/billingAndPayments/rates.aspx

271

Page 1 of 2 FEMTO Lab Information  

E-Print Network (OSTI)

each one once completed) _____ 1. Provide certification of completion for the UCSB Lab Safety Training on the measurement computers or group website. Signature (FEMTO CHP Acknowledgment) Print Name Date PI

Liebling, Michael

272

Page 1 of 2 THERMO Lab Information  

E-Print Network (OSTI)

each one once completed) _____ 1. Provide certification of completion for the UCSB Lab Safety Training or group website. Signature (THERMO CHP Acknowledgment) Print Name Date PI/Employer Information: _

Liebling, Michael

273

FIPS 186-2 Change 1, Digital Signature Standard (DSS) ...  

Science Conference Proceedings (OSTI)

... w = (s) -1 mod q u1 = ((SHA-1(M))w) mod q u2 = ((r)w) mod q v = (((g) u1 (y) u2 ) mod p) mod q. ... Proof: We have w = (s) -1 mod q = s -1 mod q ...

2013-07-17T23:59:59.000Z

274

Data:Ecd1e2f4-3463-4de8-99ba-221d66d1d072 | Open Energy Information  

Open Energy Info (EERE)

3463-4de8-99ba-221d66d1d072 3463-4de8-99ba-221d66d1d072 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - ESS Post Tops HPS 50W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_5.pdf

275

SCR_1_pps v2.p65  

NLE Websites -- All DOE Office Websites (Extended Search)

coals because of the potential for high SO 3 levels, both from SO 3 formation in the boiler and oxidation of SO 2 in the SCR reactor. NO x reduction is controlled for the most...

276

2.1E Sample Run Book  

E-Print Network (OSTI)

MAIN SUPPLY FAN (CFM ) SYSTEM DESIGN PARAMETERS ALTITUDEF) I.02 FAN KW 31- STORY OFFICE BLDG, CHICAGO DESIGN - LOAD2A SYST_ DESIGN PARAMETERS SYSTEm4 NAME SYSI SUPPLY FAN (CFM)

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

277

2.1E Sample Run Book  

E-Print Network (OSTI)

HEAT 1993EDL RUN 2 UTILITY-RATEs GAS-RATE RESOURCE, NATURAL-ES-E SUMMARY OF UTILITY-RATE: ELI_CTRGCHRONIC GLAZING ININP RUN 3 1993EDL RUN UTILITY-RATE: ELk'C-COST RESOURCE:

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

278

THERM 2.1 NFRC simulation manual  

E-Print Network (OSTI)

2.6.7. Special Products Glass blocks present a very specialthe gap between the glass layers blocks a significant amountPlastic blocks, which have a lower U-factor than glass, are

2000-01-01T23:59:59.000Z

279

H2 Safety Snapshot, Vol. 1, Issue 1, April 2009  

NLE Websites -- All DOE Office Websites (Extended Search)

suggestions? Comments? suggestions? Comments? Contact us at snapshot@pnl.gov A safety knowledge tool from Vol. 1, Issue 1, Apr. 2009 CApTurIng a Wealth of Knowledge Sharing Best Practices - an online manual and website that share the extensive experience of the safe handling and use of hydrogen in a wide variety of applications. Best practices have been compiled from a variety of resources, many of which are in the public domain and can be downloaded directly from the "References" section, which contains a bibliography, glossary, and acronyms. Best practices are organized in hierarchical categories, including multiple topics under Safety Practices, Design, and Operations. New content has been recently added to cover key topics with regard to laboratory safety. A search capability is provided

280

Data:2f1b7d71-70da-4518-99b6-a9515606c1c5 | Open Energy Information  

Open Energy Info (EERE)

d71-70da-4518-99b6-a9515606c1c5 d71-70da-4518-99b6-a9515606c1c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

Assessments, Closures, and Corrective Measures The HSWAs to RCRA, passed in 1984, require any facility seeking. At ETTP, the RCRA closure of K-1025C was completed in CY 2004. The only remaining RCRA-permitted vault in the K-25 Building is K-309-2A. RCRA Unit K-711 is slated for closure in FY 2005. Closure of K-1036A

Pennycook, Steve

282

ESH100.2.ELC.1  

NLE Websites -- All DOE Office Websites (Extended Search)

ELC.1 ELC.1 Procedure Title Manage Electrical Hazards Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Marc Ellsworth Williams (Marc E) David R. Paoletta (Dave) (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce whose activities may result in a potential electrical hazard or exposure. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

283

ESH100.2.FP.1  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Procedure Title Manage Fire Protection Requirements Procedure Manager D'ANTONIO, PERRY E. Status Active Subject Matter Expert Laura D. Draelos Aden C. Jackson (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Sandia National Laboratories (SNL) organizations, all management elements, all SNL sites, and all Members of the Workforce. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegatedview Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

284

metabolic adjustment | OpenEI Community  

Open Energy Info (EERE)

metabolic adjustment metabolic adjustment Home Dc's picture Submitted by Dc(15) Member 15 November, 2013 - 13:26 Living Walls ancient building system architect biomimicry building technology cooling cu daylight design problem energy use engineer fred andreas geothermal green building heat transfer heating living walls metabolic adjustment net zero pre-electricity Renewable Energy Solar university of colorado utility grid Wind Much of the discussion surrounding green buildings centers around reducing energy use. The term net zero is the platinum standard for green buildings, meaning the building in question does not take any more energy from the utility grid than it produces using renewable energy resources, such as solar, wind, or geothermal installations (and sometimes these renewable energy resources actually feed energy back to the utility grid).

285

,"Montana Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Montana Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12smt_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12smt_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:33 PM"

286

,"Pennsylvania Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Pennsylvania Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12spa_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12spa_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:35 PM"

287

,"California Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","California Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sca_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sca_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:30 PM"

288

,"Texas Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Texas Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12stx_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12stx_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:35 PM"

289

,"Florida Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Florida Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sfl_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sfl_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:31 PM"

290

,"Utah Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Utah Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sut_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sut_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:36 PM"

291

,"Kansas Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Kansas Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sks_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sks_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:31 PM"

292

,"Arkansas Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Arkansas Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sar_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sar_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:30 PM"

293

,"Oklahoma Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Oklahoma Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sok_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sok_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:35 PM"

294

,"Ohio Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Ohio Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12soh_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12soh_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:34 PM"

295

,"Alabama Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Alabama Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sal_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sal_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:30 PM"

296

,"Colorado Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Colorado Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sco_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sco_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:31 PM"

297

,"Michigan Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Michigan Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12smi_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12smi_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:32 PM"

298

,"Wyoming Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Wyoming Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12swy_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12swy_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:36 PM"

299

,"Louisiana Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Louisiana Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sla_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sla_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:32 PM"

300

,"Mississippi Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

Adjustments (Billion Cubic Feet)" Adjustments (Billion Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Mississippi Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2011 ,"Release Date:","8/1/2013" ,"Next Release Date:","8/1/2014" ,"Excel File Name:","rngr12sms_1a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/rngr12sms_1a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 6:09:33 PM"

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

"RSE Table C2.1. Relative Standard Errors for Table C2.1;"  

U.S. Energy Information Administration (EIA) Indexed Site

C2.1. Relative Standard Errors for Table C2.1;" C2.1. Relative Standard Errors for Table C2.1;" " Unit: Percents." " "," "," "," "," "," "," "," "," "," ",," " " "," ","Any Combustible" "NAICS"," ","Energy","Residual","Distillate",,"LPG and",,"Coke"," " "Code(a)","Subsector and Industry","Source(b)","Fuel Oil","Fuel Oil(c)","Natural Gas(d)","NGL(e)","Coal","and Breeze","Other(f)" ,,"Total United States" , 311,"Food",4,0,3,0,1,0,2,6

302

!"#$%"&'()*%+,(-.%/0% 1-2),(34(&5%&.%6700%%  

E-Print Network (OSTI)

producer Subsidy that varies with the price of crude oil or gasoline Subsidy based at least in part Biofuels Policy Alternatives Wallace E. Tyner James and Lois Ackerman Professor Purdue University In the US. The blend wall is due to the 10 percent ethanol blend used in the US today [1]. We consume about 138 billion

Ginzel, Matthew

303

2.1E BDL Summary  

E-Print Network (OSTI)

description Note: J following BOILER-type keywords used onlyfor H P loop simulation BOILER-SIZE(Automatically sized;-to 0.0 Millions Btu/Hr) BOILER-MIN-RATIO(0.25;0.0 to 1.0)

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

304

1.Enefit Overview 2.Enefit280 Process  

E-Print Network (OSTI)

bn tonnes of oil shale mined to date · Reserves of more than 1 bn tons · Annual production ca. 15 in remediation 12 000 hectares restored Oil Shale Mining · 50 years of surface retort production, more than 200 M Production · Vertically integrated utility (oil shale mining, shale oil production, generation, distribution

Utah, University of

305

Data:18b2760a-1dbe-4afa-87db-2ff878f52839 | Open Energy Information  

Open Energy Info (EERE)

60a-1dbe-4afa-87db-2ff878f52839 60a-1dbe-4afa-87db-2ff878f52839 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-1 Small Power Service between 40kW and 200kW Demand with Parallel Generation(20kW or less) Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 40kW for three or more months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

306

Data:46466533-9251-4102-a20c-81d2b6cea1fe | Open Energy Information  

Open Energy Info (EERE)

3-9251-4102-a20c-81d2b6cea1fe 3-9251-4102-a20c-81d2b6cea1fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New London Electric&Water Util Effective date: 2009/07/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0699 per kilowatt-hour.

307

Directors Welcome.......1 Faculty Focus..............2  

E-Print Network (OSTI)

The TACITUS System: The MUC-3 Experience Jerry R. Hobbs, Douglas Appelt, John Bear, Mabry Tyson were Douglas Appelt, John Bear, Jerry Hobbs, David Magerman, Ann Podlozny, Mark Stickel, and Mabry, William Croft, Todd Davies, Douglas Edwards, Kenneth Laws, Paul Martin, and Barney Pell. 2 Overall Results

Saidak, Filip

308

??? ???????? ? ? ???? ??! " #??$"% & '? ()? & 0 1"??2%3 &?546 - CECM  

E-Print Network (OSTI)

B2CDFE@GIH5PQGSRUT GVP W)XYE`R Hba cdDFeXFf f)XgRhDdEpidq rfsa@ HtE`RhDvu. fwXsRxiby?Tv ! Rhc?i isP?R?Xd?dy GVPvc?i?? Epiby?G'...

309

DD10, Characterization of L2 1  

Science Conference Proceedings (OSTI)

E3, A Compensation Mechanism for Flexible and Electrically Stable ... EE2, Following Charge-Trapping Chemical Reactions in Pentacene Films by Selective Chemical .... on Polar, Nonpolar, and Semipolar GaN Orientations Grown by Ammonia MBE ... JJ5, The Electrical Nature of Structural Defects in InSb Synthesized by...

310

Molecular aptamers for drug delivery Weihong Tan1,2  

E-Print Network (OSTI)

University, Xiamen Fujian, 361005, China The active targeting of drugs in a cell-, tissue- or diseaseMolecular aptamers for drug delivery Weihong Tan1,2 , Hui Wang2 , Yan Chen1,2,3 , Xiaobing Zhang1, 410082, China 2 Center for Research at Bio/Nano Interface, Department of Chemistry, Department

Tan, Weihong

311

Data:2f6fa2af-6016-4df4-94b0-d98183a03aa1 | Open Energy Information  

Open Energy Info (EERE)

af-6016-4df4-94b0-d98183a03aa1 af-6016-4df4-94b0-d98183a03aa1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Gs-2 General Service-Optional Time-of-Day Service Single Phase(7am-7pm) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

312

DOE-2 sample run book: Version 2.1E  

SciTech Connect

The DOE-2 Sample Run Book shows inputs and outputs for a variety of building and system types. The samples start with a simple structure and continue to a high-rise office building, a medical building, three small office buildings, a bar/lounge, a single-family residence, a small office building with daylighting, a single family residence with an attached sunspace, a ``parameterized`` building using input macros, and a metric input/output example. All of the samples use Chicago TRY weather. The main purpose of the Sample Run Book is instructional. It shows the relationship of LOADS-SYSTEMS-PLANT-ECONOMICS inputs, displays various input styles, and illustrates many of the basic and advanced features of the program. Many of the sample runs are preceded by a sketch of the building showing its general appearance and the zoning used in the input. In some cases we also show a 3-D rendering of the building as produced by the program DrawBDL. Descriptive material has been added as comments in the input itself. We find that a number of users have loaded these samples onto their editing systems and use them as ``templates`` for creating new inputs. Another way of using them would be to store various portions as files that can be read into the input using the {number_sign}{number_sign} include command, which is part of the Input Macro feature introduced in version DOE-2.lD. Note that the energy rate structures here are the same as in the DOE-2.lD samples, but have been rewritten using the new DOE-2.lE commands and keywords for ECONOMICS. The samples contained in this report are the same as those found on the DOE-2 release files. However, the output numbers that appear here may differ slightly from those obtained from the release files. The output on the release files can be used as a check set to compare results on your computer.

Winkelmann, F.C.; Birdsall, B.E.; Buhl, W.F.; Ellington, K.L.; Erdem, A.E. [Lawrence Berkeley Lab., CA (United States); Hirsch, J.J.; Gates, S. [Hirsch (James J.) and Associates, Camarillo, CA (United States)

1993-11-01T23:59:59.000Z

313

Breakout Report 1 & 2 - Incompleted Template  

NLE Websites -- All DOE Office Websites (Extended Search)

1: USING RECS FOR PROJECT FINANCING 1: USING RECS FOR PROJECT FINANCING Challenges/Issues Priority (high, medium or low impact; complex, medium or easy solution) Possible solutions What specific action(s) needed? What role can DOE play? A. Lack of long-term contracts or forward market for RECs o Uncertainty about load o Uncertainty about cost recovery of RECs o Possibility of policy changes o Eligibility and other design elements limit fungibility between markets B. Lack of price transparency in short- term and long-term REC markets o Dominance of bilateral contracts o Confidentiality concerns o Currently not required by tracking systems o Limited REC price history, except for NJ SRECs C. Uncertainty in future REC prices o Unpredictable changes in state policies

314

Alternative Fuel News Vol. 1 - No. 2  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 DOE Testing Reports Improved EV Performance Number of Ethanol Refueling Stations Growing Rapidly EPA "Raises the Bar" with Tougher Conversion Guidelines 1998 Alternative Fuel Vehicle Review . . . The Market Heats Up 1998 Alternative Fuel Vehicle Review . . . The Market Heats Up Six New Coalitions Join Clean Cities Program NT Y A U E O F E N E R G D E P A R T M E N I T E D S T A T S O F A E R I C M I Cover Story: 1998 AFV Choices Expand as Market Heats Up . . . . . . . . . . . . . . . 3 Feature Story: Clean Cities in 1997-A Hotbed of Activity . . . . . . . . . . . . . . . . . . . 8 Departments: At the Pump. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Hot off the Press. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Federal News

315

Buildings Energy Data Book: 1.2 Building Sector Expenditures  

Buildings Energy Data Book (EERE)

2 2 Building Energy Prices, by Year and Fuel Type ($2010) (cents/therm) (cents/gal) ($/gal) 1980 12.42 83.51 1.53 2.24 12.70 77.01 1.43 2.05 1981 13.14 88.83 1.47 2.51 13.33 82.90 1.63 2.32 1982 13.70 100.83 1.54 2.30 13.70 93.95 1.40 2.11 1983 13.79 113.04 1.51 2.14 13.48 104.33 1.30 1.75 1984 13.24 110.16 1.46 2.10 13.20 100.01 1.37 1.68 1985 13.28 106.80 1.37 1.96 13.06 95.96 1.21 1.56 1986 13.05 99.76 1.25 1.54 12.66 86.86 0.71 1.01 1987 12.72 92.16 1.22 1.42 11.92 79.32 0.79 1.05 1988 12.36 87.96 1.15 1.39 11.46 74.52 0.62 0.95 1989 12.17 87.08 1.39 1.48 11.28 73.39 0.70 1.07 1990 12.01 86.28 1.40 1.69 11.08 72.04 0.78 1.26 1991 11.90 83.77 1.34 1.56 10.97 69.49 0.58 1.11 1992 11.87 82.80 1.24 1.40 10.93 68.64 0.58 1.01 1993 11.78 84.73 1.19 1.33 10.81 71.91 0.58 0.96 1994 11.62 86.30 1.25 1.27 10.57 74.09 0.60 0.90 1995 11.41 79.96 1.22 1.22 10.32 66.99 0.64 0.88 1996 11.13 82.07 1.36 1.37

316

Herwig++ 2.1 Release Note.  

E-Print Network (OSTI)

License (GPL) version 2 and the MCnet guidelines for the distribution and usage of event generator software in an academic setting, which are distributed together with the source, and can also be obtained from http... which contained a bottom quark, are now different for clusters containing light, charm and bottom quarks. These include ClMax, ClPow, PSplit, ClDir and ClSmr. In addition, the option for increasing the threshold for the single hadron decay of bottom...

Bahr, M; Gieseke, Stefan; Grellscheid, D; Giggs, M; Hamilton, K; Latunde-Dada, Oluseyi; Platzer, S; Richardson, P; Seymour, Michael H; Sherstnev, A; Webber, Bryan R

317

Categorical Exclusion Determinations: B2.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 19, 2009 November 19, 2009 CX-000318: Categorical Exclusion Determination Massachusetts Revision 1 - Leading By Example CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.22, B1.23, B1.24, B1.31, B2.1, B2.2, B2.5, B5.1 Date: 11/19/2009 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 19, 2009 CX-000317: Categorical Exclusion Determination Massachusetts Revision 1 - Massachusetts Solar Stimulus CX(s) Applied: A1, A9, A11, B1.7, B1.15, B1.24, B1.31, B2.1, B2.2, B5.1 Date: 11/19/2009 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 19, 2009 CX-000316: Categorical Exclusion Determination Massachusetts Revision 1 - High Performance Buildings Program

318

Data:0453fd5a-2f67-490f-a3d1-2cfb372e4d86 | Open Energy Information  

Open Energy Info (EERE)

fd5a-2f67-490f-a3d1-2cfb372e4d86 fd5a-2f67-490f-a3d1-2cfb372e4d86 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-1 and BGS-1 Zone 2 - Bundled Residential Delivery Service - All Customers Sector: Residential Description: AVAILABILITY 1. Service under this Rate is available for any eligible Residential Customer, as determined by the Company, within the territory served by Company under this Schedule where power and energy used at Customer's Premises is for predominantly residential purposes, meeting the following criteria: a. Single-family dwelling or building containing two or more single-family units, where each unit is separately metered and used as a residence. b. Homes that are served by a single meter where usage is a combination of home and farm use. Usage shall be limited to service within the residence on the farm and that required for all general farming and agricultural purposes conducted on the premises served. Where separate meters are required to supply other operations, each additional meter shall be billed under the applicable Non-Residential rate. c. Recreation facilities consisting of summer cottages, homes, trailers or boat slips where service is individually metered and intended for continuous use by the same single family. RIDER EUA - ELECTRIC UNCOLLECTIBLE ADJUSTMENT - The purpose of this Rider is to provide for monthly adjustments to customer bills for any over-or-under recoveries of the Company's actual uncollectible expense amounts for a reporting year for each Rate Zone. Such adjustments are based on the incremental difference between actual uncollectible expense and the sum of (1) Commission-approved uncollectible amount included in the utility's rates that were in effect for the reporting year, as further defined by the formulas herein, and (2) the uncollectible amount recovered pursuant to the Commission authorized uncollectible factor included in rates for power supply service charges of Company. Rider EUA operates pursuant to Illinois Public Act 096-0033.

319

Data:98858b29-7547-4e41-be1b-55078f2b772d | Open Energy Information  

Open Energy Info (EERE)

8b29-7547-4e41-be1b-55078f2b772d 8b29-7547-4e41-be1b-55078f2b772d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: Schedule 34 - Large Industrial Customers Served Under Special Contract (Dedicated Delivery Points) - (Class B) Sector: Industrial Description: In all territory served. AVAILBILITY OF SERVICE To existing customers, Aleris and Kimberly Clark, and new customers executing special contracts approved by the Kentucky Public Service Commission. ADJUSTMENT CLAUSES: The bill amount computed at the charges specified above shall be increased or decreased in accordance with the following: Renewable Resource Energy Service Rider Fuel Adjustment Rider Environmental Surcharge Rider Unwind Surcredit Adjustment Rider Rebate Adjustment Rider Member Ri$e Stability Mechanism Rider Price Curtailable Service Rider Non-FAC Purchased Power Adjustment Rider Sheets No. 23 - 23D Sheets No. 24 - 24A Sheets No. 25 - 25A Sheets No. 26 - 26A Sheets No. 27 - 27A Sheets No. 28 - 28A Sheets No. 42 - 42C Sheets No. 30 - 30A AGREEMENT An "agreement for purchase of power" shall be signed by any new customer prior to service under the rate. Should tlie provisions of the expansion rate contained on Sheets No. 41 - 41G apply, additional language incorporating those provisions will be added to the agreement. TAXES AND FEES School Taxes added if applicable. Kentucky Sales Taxes added if applicable. FRANCHtSE CHARGE The rate herein provided shall include, where applicable, an additional charge for local government fiaiicliise payment determined in accordance with the Franchise Billing Plan as set forth on Sheet No. 105.

320

A parameterization of the Fermat curves satisfying x^(2N)+y^(2N)=1  

E-Print Network (OSTI)

Note that the family of closed curves C_N={(x,y)\\in R^2;x^(2N)+y^(2N)=1} for N=1,2,3,... approaches the boundary of [-1,1]^2 as N \\to \\infty. In this paper we exhibit a natural parameterization of these curves and generalize to a larger class of equations.

Kerry M. Soileau

2007-07-20T23:59:59.000Z

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The Biodiesel Handbook, 2nd Edition Chapter 1 Introduction  

Science Conference Proceedings (OSTI)

The Biodiesel Handbook, 2nd Edition Chapter 1 Introduction Biofuels and Bioproducts and Biodiesel Biofuels - Bioproducts eChapters Press Downloadable pdf of Chapter 1 Introduction from ...

322

Department of Energy Offers $2.1 Billion Conditional Commitment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.1 Billion Conditional Commitment Loan Guarantee to Support California Solar Thermal Power Plant Department of Energy Offers 2.1 Billion Conditional Commitment Loan Guarantee to...

323

Hierarchies of geometric entanglement M. Blasone,1,2  

E-Print Network (OSTI)

. Illuminati1,2,3,4,5,* 1 Dipartimento di Matematica e Informatica, Università degli Studi di Salerno, Via

Blasone, Massimo

324

Policy Bulletin 4, Change 1, Exemption 2 Guidance | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Use Only (OUO) under "Exemption 2, Circumvention of Statute," in DOE Classification Guides. Policy Bulletin, POL-4, Change 1, Exemption 2 Guidance More Documents &...

325

Energy Emergency Preparedness Quarterly Vol 1, Issue 2 - April...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 - April 2012 Energy Emergency Preparedness Quarterly Vol 1, Issue 2 - April 2012 The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and...

326

Buildings Energy Data Book: 2.1 Residential Sector Energy Consumption  

Buildings Energy Data Book (EERE)

5 5 Natural Fuel Other Renw. Site Site Primary Gas Oil LPG Fuel(1) En.(2) Electric Total Percent Electric (3) Total Percent Space Heating (4) 3.50 0.53 0.30 0.04 0.43 0.44 5.23 44.7% | 1.35 6.15 27.8% Water Heating 1.29 0.10 0.07 0.01 0.45 1.92 16.4% | 1.38 2.86 12.9% Space Cooling 0.00 1.08 1.08 9.2% | 3.34 3.34 15.1% Lighting 0.69 0.69 5.9% | 2.13 2.13 9.7% Refrigeration (6) 0.45 0.45 3.9% | 1.41 1.41 6.4% Electronics (5) 0.54 0.54 4.7% | 1.68 1.68 7.6% Wet Cleaning (7) 0.06 0.33 0.38 3.3% | 1.01 1.06 4.8% Cooking 0.22 0.03 0.18 0.43 3.7% | 0.57 0.81 3.7% Computers 0.17 0.17 1.5% | 0.53 0.53 2.4% Other (8) 0.00 0.16 0.01 0.20 0.37 3.2% | 0.63 0.80 3.6% Adjust to SEDS (9) 0.42 0.42 3.6% | 1.29 1.29 5.8% Total 5.06 0.63 0.56 0.04 0.45 4.95 11.69 100% | 15.34 22.07 100% Note(s): Source(s): 2010 Residential Energy End-Use Splits, by Fuel Type (Quadrillion Btu) Primary 1) Kerosene and coal are assumed attributable to space heating. 2) Comprised of wood space heating (0.42 quad), solar water heating (0.01

327

Environmental benefits of adjustable-speed drive applications  

Science Conference Proceedings (OSTI)

The industrial sector uses 37% or 3.1 quads of the electricity that is produced in the United States. Of this, 70% or 2.2 quads powers electric motors. Adjustable speed drives (ASDs), which have the potential of reducing the power requirement of constant speed motor-driven systems by 20 to 50%, can play a major role in conserving energy and energy-efficiency improvement. While they save energy, ASDs are also widely used for improving process control. This benefit is offsetting some of the incremental costs applied to industrial production. In most of the approaches being developed to tackle the environmental problem, there is a heavy emphasis on energy efficiency because it relates directly to reduced fossil fuel-based power production, which in turn cuts CO{sub 2}, NO{sub 2} and SO{sub 2} emissions. To work on improving the environment in the near term, it is necessary to promote energy-efficient equipment and systems. In the longer term, much more environmentally attractive means of power generation, transportation, and industrial production will come into play. By using new technology, such as ASDS, it is possible to maintain a standard of living at home, a rate of production in industry, or a level of comfort in an office building at a reduced level of energy consumption. Noise pollution reduction by speed control of fans by ASDs is also demonstrated. ASDs have been used to reduce fish kill in rivers (12) and are being used for water conservation. As examples of what can be accomplished in industry to improve energy efficiency and for the resulting environmental improvement, a number of uses for ASDs in electric utility power plants, in the mining industry, and the petroleum refining process are discussed. The Los Angeles Basin's plans for electrification of industry to control atmospheric emissions are included to show an example of a possible trend for the rest of the country.

Oliver, J.A. (JARSCO Engineering Corp., Corona, CA (United States))

1992-07-01T23:59:59.000Z

328

6.4.4.1.1. Data Set of Monthly CO2 Concentrations  

Science Conference Proceedings (OSTI)

... 6.4.4.1. Sample Data Sets 6.4.4.1.1. Data Set of Monthly CO2 Concentrations. Source and Background, This data set contains ...

2012-03-31T23:59:59.000Z

329

Data:1c82e1ee-9fa5-4d4e-999a-f41247c2deee | Open Energy Information  

Open Energy Info (EERE)

ee-9fa5-4d4e-999a-f41247c2deee ee-9fa5-4d4e-999a-f41247c2deee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL- HPS 100w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

330

Thermohaline Adjustment and Advection in an OGCM  

Science Conference Proceedings (OSTI)

The response of an ocean general circulation model to the onset of deep-water formation in the North Atlantic Ocean is explored. The processes of baroclinic adjustment to the new deep water mass and the advection of the new deep water mass are ...

Paul J. Goodman

2001-06-01T23:59:59.000Z

331

Geostrophic Adjustment: A Mechanism for Frontogenesis  

Science Conference Proceedings (OSTI)

A simple two-dimensional model is used to determine the geostrophically adjusted state of an initially motionless fluid with lateral density gradient. It is an extension of the much studied two-layer models to the case when the initial ...

Hsien Wang Ou

1984-06-01T23:59:59.000Z

332

On the Energy Conversion during Geostrophic Adjustment  

Science Conference Proceedings (OSTI)

It is found that for a continuously stratified fluid which remains so during the geostrophic adjustment, the energy conversion ratio ? (??KE/?PE) is , in contrast to the value of ? for a two-layer fluid. Since the two-layer fluid is an ...

Hsien Wang Ou

1986-12-01T23:59:59.000Z

333

WEATHER-ADJUSTED PERFORMANCE GUARANTEES Matt Hollingsworth  

E-Print Network (OSTI)

WEATHER-ADJUSTED PERFORMANCE GUARANTEES Matt Hollingsworth Clean Power Research Napa, CA 94559 for solar resource when creating guarantees in order to protect them against the risk created by solar production estimates coupled with a location-specific monthly solar resource index to enable installers

Perez, Richard R.

334

ESH100.2.IS.1  

NLE Websites -- All DOE Office Websites (Extended Search)

Procedure Title Work Safely in High Injury Potential/Remote Operations Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Randolph Fellhoelter Herman O. Armijo, Jr.-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who perform high-injury-potential-operations alone, in a normally unoccupied remote facility, or in a remote location. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure.

335

Data:1d8eb1e7-9eea-4f45-970e-ba171e2ae418 | Open Energy Information  

Open Energy Info (EERE)

e7-9eea-4f45-970e-ba171e2ae418 e7-9eea-4f45-970e-ba171e2ae418 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

336

K anti-K N molecule state with I=1/2 and J^P=1/2^+ studied with three-body calculation  

E-Print Network (OSTI)

A K \\bar{K} N system with I=1/2 and J^P=1/2^+ is investigated with non-relativistic three-body calculations by using effective \\bar K N, K \\bar K and KN interactions. The \\bar K N interaction describes the Lambda(1405) as a \\bar K N molecule, and the K\\bar K interaction is adjusted to give f_0(980) and a_0(980) states as K \\bar K molecules. The present investigation suggests that a bound K \\bar K N state can be formed below the K \\bar K N threshold (1930 MeV) with a 90 ~ 100 MeV width of three-hadron decays, which are dominated by K bar K N -> K pi Sigma and pi eta N. It is found that the K \\bar K N state is a weakly bound hadron molecular state with a size larger than an alpha particle because of the repulsive KN interactions.

Daisuke Jido; Yoshiko Kanada-En'yo

2008-06-23T23:59:59.000Z

337

Figure 1.2 Primary Energy Production by Source  

U.S. Energy Information Administration (EIA)

4 Geothermal, solar/photovoltaic, and wind. Source: Table 1.2. Renewable Energy4 Gas electric Power ...

338

Data:7d1b0f0d-97e2-4edb-a329-dfe9c182959f | Open Energy Information  

Open Energy Info (EERE)

b0f0d-97e2-4edb-a329-dfe9c182959f b0f0d-97e2-4edb-a329-dfe9c182959f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: GENERAL SERVICE Single Phase Sector: Commercial Description: AVAILABILITY: Electric service is available under this Schedule in the territory served by the Cooperative for nonresidential use with less than 100 kVA of transformer capacity. Resale and standby services are not permitted. Rates are subject to wholesale power cost adjustments, power factor adjustments,a North Carolina Sales Tax and Rider EE (Energy Efficiency Rider).

339

A1. SHALE GAS PRODUCTION GROWTH IN THE UNITED STATES..............................1 A2. VARIABILITY IN SHALE WELL PRODUCTION PERFORMANCE ............................1  

E-Print Network (OSTI)

1 APPENDIX1 Contents A1. SHALE GAS PRODUCTION GROWTH IN THE UNITED STATES..............................1 A2. VARIABILITY IN SHALE WELL PRODUCTION PERFORMANCE ............................1 A3. GHG FOR FLOWBACK GAS CAPTURE IN SHALE PLAYS..9 A5. REFERENCES

340

x 2 f0;1g n  

E-Print Network (OSTI)

For general 0 1 programs, that is, with the additional constraint x 2 f0;1g n ... for some polynomials fqj (x)g of degree at most n+1, and some polynomials fukj (x)g, .

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Site Environmental Report for 2010, Volumes 1 & 2  

E-Print Network (OSTI)

5. See Chapter 1, Note 4. DOE, Order 450.1A, EnvironmentalProgram (June 4, 2008). DOE Order 430.2B, DepartmentalJanuary 26, 2007, page 3919 DOE, Order 43.1, Departmental

Baskin, David

2012-01-01T23:59:59.000Z

342

Categorical Exclusion Determinations: B2.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 19, 2012 November 19, 2012 CX-009636: Categorical Exclusion Determination Ventilation Activities CX(s) Applied: B1.4, B1.16, B2.1, B2.3 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 9, 2012 CX-009615: Categorical Exclusion Determination Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 11/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office September 21, 2012 CX-009238: Categorical Exclusion Determination Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1 Date: 09/21/2012 Location(s): Grand Junction

343

Data:03c19c6d-b1be-4f3d-9e94-f307f2b612a5 | Open Energy Information  

Open Energy Info (EERE)

c6d-b1be-4f3d-9e94-f307f2b612a5 c6d-b1be-4f3d-9e94-f307f2b612a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: Residential Service-Underground Standard (A03 ISU) Sector: Residential Description: AVAILABILITY Available to any residential customer for domestic purposes only in a single private residence and qualifying farm customers. DETERMINATION OF CUSTOMER BILLS Customer bills shall reflect energy charges (if applicable) based on customer's kWh usage, plus a customer charge (if applicable), plus demand charges (if applicable) based on customer's kW billing demand as defined. INTERIM RATE ADJUSTMENT A 4.49% Interim Rate Surcharge will be applied to rate components specified in the "Interim Rate Surcharge Rider." In addition, customer bills under this rate are subject to the following adjustments and/or charges. FUEL CLAUSE Bills are subject to the adjustments provided for in the Fuel Clause Rider. RESOURCE ADJUSTMENT Bills are subject to the adjustments provided for in the Conservation Improvement Program Adjustment Rider, the State Energy Policy Rate Rider, the Renewable Development Fund Rider, the Transmission Cost Recovery Rider, the Renewable Energy Standard Rider and the Mercury Cost Recovery Rider. ENVIRONMENTAL IMPROVEMENT RIDER Bills are subject to the adjustments provided for in the Environmental Improvement Rider.

344

v= v_rot x/Rv= v_inf [1-(x/R)^2]^(1/2) RING (R) (1  

E-Print Network (OSTI)

INFALL R v_inf v_inf 0 R-R -v_inf 0 v_inf ROTATION v_rot v_rot 0 R-R 0 v_rot -v_rot R X Offset X Offset v= v_rot x/Rv= v_inf [1-(x/R)^2]^(1/2) RING (R) (1 #12;-v_inf 0 v_inf 0 0 X Offset X Offset INFALL (v_inf= const.) ROTATION (rigid solid) R1 R2 -R2 -R1 R1 R2 -R2 -R1 R1 R2 R1 R2 0 v2 v2 r1/r2 -v2 -v2

Estalella, Robert

345

Data:Afffea1d-d3e2-401c-bece-0c2565c0c04e | Open Energy Information  

Open Energy Info (EERE)

Afffea1d-d3e2-401c-bece-0c2565c0c04e Afffea1d-d3e2-401c-bece-0c2565c0c04e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/01 End date if known: Rate name: AUTOMATIC PROTECTIVE LIGHTING SERVICE 400 W MV Sector: Lighting Description: Availability Available to all classes of customers for area lighting service.Energy Cost Adjustment: Bills subject to the adjustment provided for in Energy Cost Adjustment. See Schedule X-1 Sheet No. E 63. Service Included in Rate Company will install, own, operate and provide routine maintenance to the lighting unit including the fixture, lamp, ballast, photo-electric control, mounting brackets and all necessary wiring. Company shall furnish all electric energy required for operation of the unit.

346

Data:75ba9c97-b1f2-4e9e-9c85-3666f164fce5 | Open Energy Information  

Open Energy Info (EERE)

ba9c97-b1f2-4e9e-9c85-3666f164fce5 ba9c97-b1f2-4e9e-9c85-3666f164fce5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/01 End date if known: Rate name: AUTOMATIC PROTECTIVE LIGHTING SERVICE 175 W MV Sector: Lighting Description: Availability Available to all classes of customers for area lighting service. Energy Cost Adjustment: Bills subject to the adjustment provided for in Energy Cost Adjustment. See Schedule X-1 Sheet No. E 63. Service Included in Rate Company will install, own, operate and provide routine maintenance to the lighting unit including the fixture, lamp, ballast, photo-electric control, mounting brackets and all necessary wiring. Company shall furnish all electric energy required for operation of the unit.

347

Categorical Exclusion Determinations: B2.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 19, 2010 April 19, 2010 CX-002099: Categorical Exclusion Determination Solar Thermal Water Heaters CX(s) Applied: B2.1, A9, B5.1 Date: 04/19/2010 Location(s): Logan, Utah Office(s): Energy Efficiency and Renewable Energy April 19, 2010 CX-002098: Categorical Exclusion Determination Condensing Summer Boiler CX(s) Applied: B2.1, B2.5, A9, B5.1 Date: 04/19/2010 Location(s): Logan, Utah Office(s): Energy Efficiency and Renewable Energy April 19, 2010 CX-002097: Categorical Exclusion Determination Additional Thermostatic Zones CX(s) Applied: B2.1, B2.2, A9, B1.4, B5.1 Date: 04/19/2010 Location(s): Logan, Utah Office(s): Energy Efficiency and Renewable Energy April 19, 2010 CX-001861: Categorical Exclusion Determination Park County's Activity Area 1 (Development of Energy Efficiency and

348

CCSP Product 2.2 Draft for Public Review 1 2 3 4 5 6 7  

E-Print Network (OSTI)

North America is home to approximately 41 % of the global wetland area, encompassing about 2.5 million km 2 with a carbon pool of approximately 220 Gt, mostly in peatland soils. North American wetlands currently are a CO2 sink of approximately 70 Mt C yr-1, but that estimate has an uncertainty of greater than 100%. North American wetlands are also a source of approximately 26 Mt yr-1 of methane, a more potent atmospheric heat-trapping gas. The uncertainty in that flux is also greater than 100%. Historically, the destruction of North American wetlands through land-use change has reduced carbon storage in wetlands by 43 Mt C yr-1, primarily through the oxidation of carbon in peatland soils as they are drained and a more general reduction in carbon sequestration capacity of wetlands converted to other land uses. Methane emissions have also declined with the loss of wetland area. Projections of future carbon storage and methane emissions of North American wetlands are highly uncertain and complex, but the large carbon pools in peatlands may be at risk for oxidation and release to the atmosphere as CO2 if they become substantially warmer and drier. Methane emissions may increase with warming, but the response will likely vary with wetland type and with changes in precipitation.

unknown authors

2006-01-01T23:59:59.000Z

349

P-D Project Rate Adjustment  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Davis Project Rate Adjustment Data Parker-Davis Project Rate Adjustment Data FY2014 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2013 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Supplemental Information Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2012 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Customer Requested Scenario Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2011 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design

350

Article mounting and position adjustment stage  

DOE Patents (OSTI)

An improved adjustment and mounting stage of the type used for the detection of laser beams is disclosed. A ring sensor holder has locating pins on a first side thereof which are positioned within a linear keyway in a surrounding housing for permitting reciprocal movement of the ring along the keyway. A rotatable ring gear is positioned within the housing on the other side of the ring from the linear keyway and includes an oval keyway which drives the ring along the linear keyway upon rotation of the gear. Motor-driven single-stage and dual (x, y) stage adjustment systems are disclosed which are of compact construction and include a large laser transmission hole. 6 figs.

Cutburth, R.W.; Silva, L.L.

1988-05-10T23:59:59.000Z

351

The Higgs Boson Width is Adjustable  

E-Print Network (OSTI)

We show that it is possible to construct models in which the width of the Higgs boson is arbitrary- either smaller or larger than a standard model Higgs boson of the same mass. There are no new fields into which the Higgs boson decays. Instead, the coupling of the Higgs boson to the gauge bosons is adjusted. We construct and analyze weaklycoupled models with arbitrarywidth Higgs bosons to investigate the phenomenology one might find in a strongly interacting model. In any such model new physics must enter at a mass scale which decreases as the Higgs boson width is adjusted away from its standard model value. In particular, if the Higgs boson is wider than the standard model Higgs boson, then interesting new physics must appear in the isospintwo channel.

R. Sekhar Chivukulaa; Michael J. Dugana

1994-01-01T23:59:59.000Z

352

The Higgs Boson Width is Adjustable  

E-Print Network (OSTI)

We show that it is possible to construct models in which the width of the Higgs boson is arbitrary - either smaller or larger than a standard model Higgs boson of the same mass. There are no new fields into which the Higgs boson decays. Instead, the coupling of the Higgs boson to the gauge bosons is adjusted. We construct and analyze weakly--coupled models with arbitrary--width Higgs bosons to investigate the phenomenology one might find in a strongly interacting model. In any such model new physics must enter at a mass scale which decreases as the Higgs boson width is adjusted away from its standard model value. In particular, if the Higgs boson is wider than the standard model Higgs boson, then interesting new physics must appear in the isospin--two channel.

R. Sekhar Chivukula; Michael J. Dugan; Mitchell Golden

1994-06-10T23:59:59.000Z

353

Data:4a1db927-0ed5-4b50-957c-8fc2a00e1a10 | Open Energy Information  

Open Energy Info (EERE)

db927-0ed5-4b50-957c-8fc2a00e1a10 db927-0ed5-4b50-957c-8fc2a00e1a10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Dublin Municipal Electric Util Effective date: 2006/08/15 End date if known: Rate name: Residential: Water Heater Service Sector: Residential Description: Rate is subject to the following adjustments: Wholesale Power Cost Adjustment and Fuel Cost Adjustment. The Tiered Rates entered here are the same as the Residential rate for Dublin Municipal Electric Util. The Water Heat Service rate includes the following provision: "Where a Customer has installed and in regular use a standard approved type of electric water heater of not less than 30 gallons capacity, the last 40 kwh used in any month shall be billed at the rate of: $.074/kwh"

354

A3 Meyer/Jung 1 2.1 Teilprojekt A3  

E-Print Network (OSTI)

¨ at Chemnitz SFB 393 ARBEITS-- UND ERGEBNISBERICHT 1999--2000--2001 SFB 393 An die Deutsche.1 Wissenschaftliche Entwicklung des Sonderforschungsbereichs . . . . 9 1.2 Entwicklung der Kooperation im, wissenschaftliche Kontakte . . . . . . . . . 310 3.1.3.1 Gastwissenschaftler . . . . . . . . . . . . . . . . . . 310

Chemnitz, Technische Universität

355

Remote control for anode-cathode adjustment  

DOE Patents (OSTI)

An apparatus for remotely adjusting the anode-cathode gap in a pulse power machine has an electric motor located within a hollow cathode inside the vacuum chamber of the pulse power machine. Input information for controlling the motor for adjusting the anode-cathode gap is fed into the apparatus using optical waveguides. The motor, controlled by the input information, drives a worm gear that moves a cathode tip. When the motor drives in one rotational direction, the cathode is moved toward the anode and the size of the anode-cathode gap is diminished. When the motor drives in the other direction, the cathode is moved away from the anode and the size of the anode-cathode gap is increased. The motor is powered by batteries housed in the hollow cathode. The batteries may be rechargeable, and they may be recharged by a photovoltaic cell in combination with an optical waveguide that receives recharging energy from outside the hollow cathode. Alternatively, the anode-cathode gap can be remotely adjusted by a manually-turned handle connected to mechanical linkage which is connected to a jack assembly. The jack assembly converts rotational motion of the handle and mechanical linkage to linear motion of the cathode moving toward or away from the anode.

Roose, Lars D. (Albuquerque, NM)

1991-01-01T23:59:59.000Z

356

Remote control for anode-cathode adjustment  

DOE Patents (OSTI)

An apparatus for remotely adjusting the anode-cathode gap in a pulse power machine has an electric motor located within a hollow cathode inside the vacuum chamber of the pulse power machine. Input information for controlling the motor for adjusting the anode-cathode gap is fed into the apparatus using optical waveguides. The motor, controlled by the input information, drives a worm gear that moves a cathode tip. When the motor drives in one rotational direction, the cathode is moved toward the anode and the size of the anode-cathode gap is diminished. When the motor drives in the other direction, the cathode is moved away from the anode and the size of the anode-cathode gap is increased. The motor is powered by batteries housed in the hollow cathode. The batteries may be rechargeable, and they may be recharged by a photovoltaic cell in combination with an optical waveguide that receives recharging energy from outside the hollow cathode. Alternatively, the anode-cathode gap can be remotely adjusted by a manually-turned handle connected to mechanical linkage which is connected to a jack assembly. The jack assembly converts rotational motion of the handle and mechanical linkage to linear motion of the cathode moving toward or away from the anode. 3 figs.

Roose, L.D.

1989-10-04T23:59:59.000Z

357

"RSE Table E2.1. Relative Standard Errors for Table E2.1;"  

U.S. Energy Information Administration (EIA) Indexed Site

E2.1. Relative Standard Errors for Table E2.1;" E2.1. Relative Standard Errors for Table E2.1;" " Unit: Percents." " "," "," "," ",," "," ",," " "Economic",,"Residual","Distillate",,"LPG and",,"Coke and"," " "Characteristic(a)","Total","Fuel Oil","Fuel Oil(b)","Natural Gas(c)","NGL(d)","Coal","Breeze","Other(e)" ,"Total United States" "Value of Shipments and Receipts" "(million dollars)" " Under 20",9,87,48,26,1,85,16,25 " 20-49",11,32,28,5,63,20,3,21 " 50-99",8,23,38,2,22,49,42,4

358

Photon Transitions in ?(2S) Decays to ?_{cJ}(1P) and ?_c(1S)  

E-Print Network (OSTI)

We have studied the inclusive photon spectrum in psi(2S) decays using the CLEO III detector. We present the most precise measurements of electric dipole (E1) photon transition rates for psi(2S)--> gamma chicJ(1P) (J=0,1,2). We also confirm the hindered magnetic dipole (M1) transition, psi(2S)-->gamma etac(1S). However, the direct M1 transition psi(2S)-->gamma etac(2S) observed by the Crystal Ball as a narrow peak at a photon energy of 91 MeV is not found in our data.

S. B. Athar

2004-08-26T23:59:59.000Z

359

Supplementary Materials1 Atmospheric API-CIMS:2  

E-Print Network (OSTI)

1 Supplementary Materials1 Atmospheric API-CIMS:2 The atmospheric API-CIMS is a downsized version and discriminator/preamplifier. The primary9 difference between this instrument and the earlier CIMS instrument circuit board.22 23 Figure S1: mesoCIMS instrument schematic24 #12;2 DMS gas standards:25 Isotopically

Meskhidze, Nicholas

360

Categorical Exclusion Determinations: B2.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2011 December 27, 2011 CX-007570: Categorical Exclusion Determination EL-11-002 East Marshall High School Geothermal Project CX(s) Applied: B5.19, B2.1 Date: 12/27/2011 Location(s): Iowa Offices(s): Golden Field Office December 15, 2011 CX-007519: Categorical Exclusion Determination Waste Management Construction Support CX(s) Applied: B1.3, B1.11, B1.23, B1.24, B1.27, B1.28, B1.29, B1.31, B2.1 Date: 12/15/2011 Location(s): Tennessee Offices(s): Y-12 Site Office December 9, 2011 CX-007482: Categorical Exclusion Determination B94 Hazardous Gas Alarms CX(s) Applied: B1.29, B2.1, B2.2, B2.3, B2.5 Date: 12/09/2011 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory December 6, 2011 CX-007490: Categorical Exclusion Determination B-2 Area 40 Office Reconfiguration

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Part II, Section 2, Chapter 1. Plasma Dynamics Chapter 1. Plasma Dynamics  

E-Print Network (OSTI)

of importance to the achievement of efficient steady- state operation in tokamaks. Section 1.1.3 describes of plasma heating and current drive.3 1.1.2 Interaction of Bootstrap Current and RF Waves in Tokamaks Interactions ­ RF Heating and Current Generation 1.1.1 Introduction As outlined in RLE Progress Report No. 140

362

Adjustable permanent quadrupoles for the next linear collider  

Science Conference Proceedings (OSTI)

The proposed Next Linear Collider (NLC) will require over 1400 adjustable quadrupoles between the main linacs' accelerator structures. These 12.7 mm bore quadrupoles will have a range of integrated strength from 0.6 to 138 Tesla, with a maximum gradient of 141 Tesla per meter, an adjustment range of +0 to {minus}20% and effective lengths from 324 mm to 972 mm. The magnetic center must remain stable to within 1 micron during the 20% adjustment. In an effort to reduce costs and increase reliability, several designs using hybrid permanent magnets have been developed. Four different prototypes have been built. All magnets have iron poles and use Samarium Cobalt to provide the magnetic fields. Two use rotating permanent magnetic material to vary the gradient, one uses a sliding shunt to vary the gradient and the fourth uses counter rotating magnets. Preliminary data on gradient strength, temperature stability, and magnetic center position stability are presented. These data are compared to an equivalent electromagnetic prototype.

James T. Volk et al.

2001-06-22T23:59:59.000Z

363

R&D SFA-1 (Rev. 2, 3/11/13) Appendix SFA-1  

NLE Websites -- All DOE Office Websites (Extended Search)

by reference into this subcontract when the condition(s) for applicability isare met. R&D SFA-1 (Rev. 2, 31113) Appendix SFA-1 Dated * Subcontract No. * Page 2 of 8 THE...

364

Spontaneous magnetization in dipolar needles George Miloshevich1,2  

E-Print Network (OSTI)

Khomeriki1,4 , Stefano Ruffo3,5 (1) Department of Physics, Faculty of Exact and Natural Sciences, Tbilisi State University, 0128 Tbilisi, Georgia (2) Department of Physics, The University of Texas at Austin

Paris-Sud XI, Université de

365

Gearbox Reliability Collaborative - Phase 1 and 2 Overview (Presentation)  

DOE Green Energy (OSTI)

The presentation given at the Wind Turbine Reliability Workshop at Sandia National Laboratories, August 2-3, 2011, serves as an overview for the findings from the Gearbox Reliability Collaborative Project Report: Findings from Phase 1 and Phase 2 Testing

Link, H.

2011-08-01T23:59:59.000Z

366

EMPORA 1 + 2 EMobile Power Austria (Smart Grid Project) (Salzburg...  

Open Energy Info (EERE)

"EU Smart Grid Projects Map" Retrieved from "http:en.openei.orgwindex.php?titleEMPORA1%2B2EMobilePowerAustria(SmartGridProject)(Salzburg,Austria)&oldid405637...

367

General equations for Biomass Properties Nadge Richard1,2  

E-Print Network (OSTI)

1 General equations for Biomass Properties Nadège Richard1,2 , Henrik Thunman1 1 Department of biomass fuels. The following properties were selected: - the amount of char (Ychar) - the composition: - the temperature of devolatilisation reactor (T) - the heating value of biomass (Hwood) - the ash content

368

Table 2.1 Energy Consumption by Sector (Trillion Btu)  

U.S. Energy Information Administration (EIA)

U.S. Energy Information Administration / Monthly Energy Review October 2013 23 Table 2.1 Energy Consumption by Sector (Trillion Btu) End-Use Sectors Electric

369

Light Baryons from 2+1 flavor DWF QCD  

E-Print Network (OSTI)

We present results from the RBC and UKQCD collaboration ensembles of 2+1 flavor DWF QCD for the light baryon spectrum.

C. M. Maynard; RBC; UKQCD collaborations

2010-01-28T23:59:59.000Z

370

Validated 140-1 and 140-2 Cryptographic Modules  

Science Conference Proceedings (OSTI)

... Supports Windows Mobile, MAC iOS, MAC OSX and Google Android, in version 1.0.2, though not operationally tested. ...

2013-08-14T23:59:59.000Z

371

#2-G. Camacho D;1-0 #2-G. Camacho M;11-1  

E-Print Network (OSTI)

(Elmhurst) Tyler Hernandez (Augustana) Juan Diaz (Lakeland) BYE Ryan Klein (Univ Chicago) Brian Trader (MSOE-Elroy Perkins (UW Whitewater) Tyler Hernandez (Augustana) T. Hernandez BYE Matt Ostovich (MSOE) BYE E. Mc D;10-5 M. Palmisano D;10-3 #1-D. Wozniak F;4:42 M. Harmon D;10-5 #1-D. Wozniak #1-Dustin Wozniak (UW

LaRiviere, Patrick

372

Categorical Exclusion Determinations: B2.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 23, 2010 September 23, 2010 CX-004039: Categorical Exclusion Determination Replacement of Heating Systems CX(s) Applied: B1.3, B2.1, B2.5, B5.1 Date: 09/23/2010 Location(s): Bozeman, Montana Office(s): Energy Efficiency and Renewable Energy September 23, 2010 CX-004037: Categorical Exclusion Determination Insulation of the Gallatin County Weed Shop CX(s) Applied: B2.1, B2.5, B5.1 Date: 09/23/2010 Location(s): Bozeman, Montana Office(s): Energy Efficiency and Renewable Energy September 21, 2010 CX-004078: Categorical Exclusion Determination The Joint Center for Artificial Photosynthesis CX(s) Applied: A7, B1.4, B1.5, B1.7, B1.15, B1.24, B2.1, B2.2, B3.6 Date: 09/21/2010 Location(s): Chicago, Illinois Office(s): Science, Chicago Office September 10, 2010 CX-003839: Categorical Exclusion Determination

373

PET 424304 2013 Exercises 1+2 of 4 12 Feb + 14 Feb 2013 1. ideal gas: s = s2-s1 = cpln(T2/T1) -R ln(p2/p1) (T << Tcrit; p << pcrit)  

E-Print Network (OSTI)

be 93% (see a.), effectiveness = 21/93 = 23% c. Heat from boiler to surroundings: 50,2 ··(7834 ­ 3004 = 11,5 kW/K Losses: collector 4,77 MW ­ 4,45 MW = 0,32 MW = 6,7% boiler radiation 1,05 MW = 22,0% Power

Zevenhoven, Ron

374

Cytoplasmic Domain Structures of Kir2.1 and Kir3.1 Shows Sites for  

NLE Websites -- All DOE Office Websites (Extended Search)

Cytoplasmic Domain Structures of Cytoplasmic Domain Structures of Kir2.1 and Kir3.1 Shows Sites for Modulating Gating and Rectification Scott Pegan1, Christine Arrabit2, Wei Zhou1, Witek Kwiatkowski1, Anthony Collins3, Paul Slesinger2 and Senyon Choe1 Structural Biology1 and Peptide Biology2 Laboratories, The Salk Institute, La Jolla, Ca 92037; Department of Pharmaceutical Sciences3, College of Pharmacy, Oregon State University, Corvallis, OR 97331 Figure 1. Kir2.1 cytoplasmic domain's backbone and surface are highlighted in yellow merged with KirBac1.1 transmembrane region's backbone and surface in gray. The gate forming tip of the G-loop, amino acids 304-306, is highlighted in red. The family of inwardly-rectifying potassium (Kir) channels of eukaryotic cells are unique because they conduct K+ ions better in the inward than

375

Data:B1a0f304-af62-41b2-aba1-5665ff7124f3 | Open Energy Information  

Open Energy Info (EERE)

4-af62-41b2-aba1-5665ff7124f3 4-af62-41b2-aba1-5665ff7124f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Single Phase 8am-8pm with Parallel Generation(20 kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour. Parallel Generation (20 kW or less) Net Energy Billing - Available for single-phase and three-phase customers where a part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capability of 20 kW or less, where such facilities are connected in parallel with the utility and where such facilities are approved by the utility. Rate: The customer shall be billed monthly on a net energy basis and shall pay the fixed charge and energy charge specified in the rate schedule under which he is served. If, in any month, the customer's bill has a credit balance of $25 or less, the amount shall be credited to subsequent bills until a debit balance is reestablished. If the credit balance is more than $25, the utility shall reimburse the customer by check upon request. Monthly credits shall be computed by taking the net excess kilowatt-hours produced times the sum of the applicable energy charge plus monthly power cost adjustment clause (PCAC). This rate will be applied to residential single-phase and three-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission.

376

Data:2dc15f22-1e0c-4ab1-b257-144403b8913d | Open Energy Information  

Open Energy Info (EERE)

2-1e0c-4ab1-b257-144403b8913d 2-1e0c-4ab1-b257-144403b8913d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - ESS Flood Lights HPS 1000W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_5.pdf

377

Lumpy Price Adjustments: A Microeconometric Analysis  

E-Print Network (OSTI)

change in response to a given shock. This model is very close in spirit to the econometric model proposed by Rosett (1959) for the analysis of frictions in yield changes. However, we depart from Rosett?s model in that, in our model, the adjustment... , in the sequel, use anymore the index j for products since we estimate this model for each product separately. 4 best modelled as a stochastic process. Another argument for adopting such an approach lies in the synchronization of price changes within stores...

Dhyne, Emmanuel; Fuss, Catherine; Pesaran, M Hashem; Sevestre, Patrick

378

Elliptically polarizing adjustable phase insertion device  

DOE Patents (OSTI)

An insertion device for extracting polarized electromagnetic energy from a beam of particles is disclosed. The insertion device includes four linear arrays of magnets which are aligned with the particle beam. The magnetic field strength to which the particles are subjected is adjusted by altering the relative alignment of the arrays in a direction parallel to that of the particle beam. Both the energy and polarization of the extracted energy may be varied by moving the relevant arrays parallel to the beam direction. The present invention requires a substantially simpler and more economical superstructure than insertion devices in which the magnetic field strength is altered by changing the gap between arrays of magnets.

Carr, Roger (Redwood City, CA)

1995-01-01T23:59:59.000Z

379

,"U.S. Total Adjusted Sales of Distillate Fuel Oil by End Use...  

U.S. Energy Information Administration (EIA) Indexed Site

,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Total Adjusted Sales of Distillate Fuel Oil by End Use",13,"Annual",2012,"6301984"...

380

DOE G 414.1-4 and 404.1-2B Training module  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14.1-4 14.1-4 SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART A, QUALITY ASSURANCE REQUIREMENTS, AND DOE O 414.1C, QUALITY ASSURANCE DOE G 414.1-2B QUALITY ASSURANCE PROGRAM GUIDE DOE G 414.1-4 and DOE G 414.1-2B Familiar Level November 2011 1 DOE G 414.1-4 SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART A, QUALITY ASSURANCE REQUIREMENTS, AND DOE O 414.1C, QUALITY ASSURANCE DOE G 414.1-2B QUALITY ASSURANCE PROGRAM GUIDE FAMILIAR LEVEL OBJECTIVES Given the familiar level of this module and the resources, you will be able to answer the following questions: 1. What is the purpose of DOE O 414.1D, attachment 3, Suspect/Counterfeit Items Prevention? 2. What are four ways of preventing introduction of suspect/counterfeit items (S/CIs) into

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Public-Key Cryptography Standards (PKCS) #1: RSA Cryptography Specifications Version 2.1  

Science Conference Proceedings (OSTI)

This memo represents a republication of PKCS #1 v2.1 from RSA Laboratories' Public-Key Cryptography Standards (PKCS) series, and change control is retained within the PKCS process. The body of this document is taken directly from the PKCS #1 v2.1 document, ...

J. Jonsson; B. Kaliski

2003-02-01T23:59:59.000Z

382

National Institute of Standards and Technology Draft 1.2.1 -1 -The Network Simulator NS-2  

E-Print Network (OSTI)

.................................................................................................. 5 3.3 TCL commands................................................................................................................ 11 4.6.2 TCL commands............................................................................................... 12 4.7.2 TCL commands

Magee, Joseph W.

383

Contributions of Different Cloud Types to Feedbacks and Rapid Adjustments in CMIP5  

Science Conference Proceedings (OSTI)

Using five climate model simulations of the response to an abrupt quadrupling of CO2, the authors perform the first simultaneous model intercomparison of cloud feedbacks and rapid radiative adjustments with cloud masking effects removed, ...

Mark D. Zelinka; Stephen A. Klein; Karl E. Taylor; Timothy Andrews; Mark J. Webb; Jonathan M. Gregory; Piers M. Forster

2013-07-01T23:59:59.000Z

384

Data:Da3df0aa-2e0d-4ddb-b72c-58fb1ef9c2fe | Open Energy Information  

Open Energy Info (EERE)

aa-2e0d-4ddb-b72c-58fb1ef9c2fe aa-2e0d-4ddb-b72c-58fb1ef9c2fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Large Power- Time-of-Day Sector: Commercial Description: This rate will be applied to customers for all types of service, if their monthly Maximum Measured Demand is in excess of 200 kilowatts (kW) per month for three or more months in a consecutive 12-month period, but not greater than 1,000 kW per month for three or more months in a consecutive 12-month period. The following Riders, Adjustments, and Billing Options are applicable to this rate:

385

TA Orientation 2004 Name: . Activity #2a (1 point)  

E-Print Network (OSTI)

TA Orientation 2004 Name: . Activity #2a (1 point) Page 7 EXPLORATORY PROBLEM #1: Light Patterns shade); and a large white cardboard screen (representing the side of the building). #12;TA Orientation would see on the screen. #12;TA Orientation 2004 Activity #2a (continued) Page 9 Why did you draw what

Minnesota, University of

386

Security Meta-Services Orchestration Architecture Aymen Baouab1 2  

E-Print Network (OSTI)

Security Meta-Services Orchestration Architecture Aymen Baouab1 2 , Olivier Perrin1 , Nicolas Biri2. However, those benefits make security more difficult to control. Fortunately, new standards are proposed the characteristics of SOA. In this paper, we ad- dress this issue by separating security services from busi- ness

Paris-Sud XI, Université de

387

Self-adjusting magnetic bearing systems  

SciTech Connect

A self-adjusting magnetic bearing automatically adjusts the parameters of an axially unstable magnetic bearing such that its force balance is maintained near the point of metastable equilibrium. Complete stabilization can be obtained with the application of weak restoring forces either from a mechanical bearing (running at near-zero load, thus with reduced wear) or from the action of residual eddy currents in a snubber bearing. In one embodiment, a torque is generated by the approach of a slotted pole to a conducting plate. The torque actuates an assembly which varies the position of a magnetic shunt to change the force exerted by the bearing. Another embodiment achieves axial stabilization by sensing vertical displacements in a suspended bearing element, and using this information in an electrical servo system. In a third embodiment, as a rotating eddy current exciter approaches a stationary bearing, it heats a thermostat which actuates an assembly to weaken the attractive force between the two bearing elements. An improved version of an electromechanical battery utilizing the designs of the various embodiments is described.

Post, Richard F. (Walnut Creek, CA)

1998-01-01T23:59:59.000Z

388

Self-adjusting magnetic bearing systems  

DOE Patents (OSTI)

A self-adjusting magnetic bearing automatically adjusts the parameters of an axially unstable magnetic bearing such that its force balance is maintained near the point of metastable equilibrium. Complete stabilization can be obtained with the application of weak restoring forces either from a mechanical bearing (running at near-zero load, thus with reduced wear) or from the action of residual eddy currents in a snubber bearing. In one embodiment, a torque is generated by the approach of a slotted pole to a conducting plate. The torque actuates an assembly which varies the position of a magnetic shunt to change the force exerted by the bearing. Another embodiment achieves axial stabilization by sensing vertical displacements in a suspended bearing element, and using this information in an electrical servo system. In a third embodiment, as a rotating eddy current exciter approaches a stationary bearing, it heats a thermostat which actuates an assembly to weaken the attractive force between the two bearing elements. An improved version of an electromechanical battery utilizing the designs of the various embodiments is described. 7 figs.

Post, R.F.

1998-07-21T23:59:59.000Z

389

E2: Aging Behavior and Microstructure Observation of MgB2/ Al-1.0 ...  

Science Conference Proceedings (OSTI)

In this work, aging behavior of MgB2 particle dispersed Al-1mass%Mg2Si alloy composite material which including 4, 8 and 50 vol. % MgB2, was investigate by

390

Spin in the worldline path integral in 2 + 1 dimensions  

Science Conference Proceedings (OSTI)

We present a constructive derivation of a worldline path integral for the effective action and the propagator of a Dirac field in 2 + 1 dimensions, in terms of spacetime and SU(2) paths. After studying some general properties of this representation, we show that the auxiliary gauge-group variable can be integrated, deriving a worldline action depending only on x({tau}), the spacetime paths. We then show that the functional integral automatically imposes the constraint x{sup .2}({tau})=1, while there is a spin action, which agrees with the one one should expect for a spin-1/2 field.

Fosco, C.D. [Centro Atomico Bariloche and Instituto Balseiro, Comision Nacional de Energia Atomica, 8400 Bariloche (Argentina); Sanchez-Guillen, J. [Departamento de Fisica de Particulas, Facultad de Fisica and Instituto Galego de Fisica de Altas Energias, Universidad de Santiago, E-15782 Santiago de Compostela (Spain); Vazquez, R.A. [Departamento de Fisica de Particulas, Facultad de Fisica and Instituto Galego de Fisica de Altas Energias, Universidad de Santiago, E-15782 Santiago de Compostela (Spain)], E-mail: vazquez@fpaxp1.usc.es

2008-02-15T23:59:59.000Z

391

Preparation of 1,1'-dinitro-3,3'-azo-1,2,4-triazole. [1,1'-dinitro-3,3'-azo-1,2,4-triazole  

DOE Patents (OSTI)

A new high density composition of matter, 1,1'-dinitro-3,3'-azo-1,2,4-triazole, has been synthesized using inexpensive, commonly available compounds. This compound has been found to be an explosive, and its use as a propellant is anticipated. 1 fig., 1 tab.

Lee, K.Y.

1985-03-05T23:59:59.000Z

392

Data:Cfba2ab3-c988-4037-a455-d6e1f28fd1d7 | Open Energy Information  

Open Energy Info (EERE)

Cfba2ab3-c988-4037-a455-d6e1f28fd1d7 Cfba2ab3-c988-4037-a455-d6e1f28fd1d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - FL (Small) Sector: Lighting Description: 27,500 lumen flood light fixture mounted on a Cooperative pole. Source or reference: https://www.clayelectric.com/rates.aspx Source Parent: Comments 107 kWh/month estimate. $12.35 fixed monthly is per customer in addition to a $3.50/month charge (if necessary) for the Cooperative's pole plus current month's Power Cost Adjustment and applicable taxes.

393

Data:46162d74-c1d2-4c45-9628-837a8408afd1 | Open Energy Information  

Open Energy Info (EERE)

d74-c1d2-4c45-9628-837a8408afd1 d74-c1d2-4c45-9628-837a8408afd1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2001/11/01 End date if known: Rate name: LARGE POWER SERVICE - Schedule LP-3 - Secondary Sector: Industrial Description: This schedule applies to all large power customers where actual demand has exceeded one thousand kilowatts three times or more within the preceding twelve months or where installed capacity serving a customer at a single, contiguous site is 2500 kilovolt-amperes (KVA) or greater. Heavy Load Period Demand Charges: The maximum billing occurring during the hours of 7 a.m. through 12 noon, Monday through Saturday, after adjustment for power factor.

394

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4  

U.S. Energy Information Administration (EIA) Indexed Site

Current Forecast: December 10, 2013; Previous Forecast: November 13, 2013 Current Forecast: December 10, 2013; Previous Forecast: November 13, 2013 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2011 2012 2013 2014 2011-2012 2012-2013 2013-2014 U.S. Energy Supply U.S. Crude Oil Production (million barrels per day) Current 6.22 6.29 6.42 7.02 7.11 7.29 7.61 7.97 8.26 8.45 8.57 8.86 5.65 6.49 7.50 8.54 14.8% 15.6% 13.8% Previous 6.22 6.30 6.43 7.04 7.13 7.30 7.60 7.91 8.22 8.40 8.52 8.80 5.65 6.50 7.49 8.49 15.0% 15.2% 13.3% Percent Change 0.0% -0.1% -0.2% -0.2% -0.3% -0.1% 0.1% 0.7% 0.5% 0.5% 0.6% 0.6% 0.0% -0.1% 0.1% 0.6% U.S. Dry Natural Gas Production (billion cubic feet per day) Current 65.40 65.49 65.76 66.34 65.78 66.50 67.11 67.88 67.99 67.74 67.37 67.70 62.74 65.75 66.82 67.70 4.8% 1.6% 1.3% Previous 65.40 65.49 65.76 66.34 65.78 66.50 67.11 67.30 67.47 67.41 67.04 67.37 62.74 65.75 66.68 67.32

395

Categorical Exclusion Determinations: B1.2 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 26, 2010 April 26, 2010 CX-001947: Categorical Exclusion Determination Community Partners Initiative CX(s) Applied: A9, A11, B1.2, B5.1 Date: 04/26/2010 Location(s): Perth Amboy, New Jersey Office(s): Energy Efficiency and Renewable Energy April 23, 2010 CX-001771: Categorical Exclusion Determination Ormond Beach Educational Website CX(s) Applied: B1.2, B5.1 Date: 04/23/2010 Location(s): Ormond Beach, Florida Office(s): Energy Efficiency and Renewable Energy April 20, 2010 CX-001767: Categorical Exclusion Determination Commerce's Energy Efficiency and Conservation Programs CX(s) Applied: A1, A9, B1.2, B5.1 Date: 04/20/2010 Location(s): Commerce, Colorado Office(s): Energy Efficiency and Renewable Energy April 19, 2010 CX-002101: Categorical Exclusion Determination Compilation of Technical Consultants, Energy Efficiency Retrofits and

396

1 Cactus Framework: Black Holes to Gamma Ray Bursts 7 Erik Schnetter1,2  

E-Print Network (OSTI)

Contents 1 Cactus Framework: Black Holes to Gamma Ray Bursts 7 Erik Schnetter1,2 , Christian D. Ott 94720, USA 1.1 Current challenges in relativistic astrophysics and the Gamma- Ray Burst problem-8493-0052-5/00/$0.00+$.50 c 2001 by CRC Press LLC 5 #12;#12;Chapter 1 Cactus Framework: Black Holes to Gamma Ray Bursts Erik

397

Buildings Energy Data Book: 1.2 Building Sector Expenditures  

Buildings Energy Data Book (EERE)

3 3 Buildings Aggregate Energy Expenditures, by Year and Major Fuel Type ($2010 Billion) (1) Residential Buildings Commercial Buildings Total Building Electricity Natural Gas Petroleum (2) Total Electricity Natural Gas Petroleum (3) Total Expenditures 1980 89.1 40.5 28.9 158.5 70.9 20.5 17.2 108.6 267.2 1981 94.9 41.3 27.8 164.0 79.4 21.4 16.5 117.3 281.3 1982 99.9 47.9 24.5 172.3 83.4 25.1 13.7 122.2 294.5 1983 103.6 51.0 21.4 176.1 83.6 26.1 14.6 124.3 300.4 1984 103.3 51.6 23.6 178.5 87.6 25.9 14.7 128.2 306.7 1985 105.4 48.8 22.6 176.8 90.0 24.0 12.6 126.6 303.4 1986 106.9 44.2 18.1 169.2 90.5 20.7 9.1 120.2 289.4 1987 108.2 40.9 18.0 167.1 88.7 19.8 9.2 117.7 284.7 1988 110.3 41.8 18.0 170.1 89.9 20.4 8.2 118.5 288.7 1989 110.2 42.9 19.7 172.8 91.5 20.5 8.4 120.4 293.2 1990 110.9 39.0 18.2 168.2 92.9 19.4 9.2 121.5 289.7 1991 113.7 39.2 17.0 169.9 93.9 19.5 7.7 121.1 291.0

398

Adjusted Distillate Fuel Oil Sales for Residential Use  

U.S. Energy Information Administration (EIA)

Central Atlantic (PADD 1B) 2,352,140: 2,431,656: 1,926,574: 1,750,150: 1,639,069: 1,570,785: 1984-2012: Delaware: ... Washington: 44,304: 38,803: ...

399

Cell",1,2,3,4,5,6,7,8  

Office of Legacy Management (LM)

/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09" /1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09","1/1/09-1/31/09" "Accumulation Rate:" "(gallons per day for above period)",0,0,0,0.85,2.88,1.45,1.87,1.6 "Accumulation Rate:" "(gallons/acre/day for above period)",0,0,0,0.13,0.45,0.23,0.29,0.17 "*Data are draft and subject to be modified based on additional quality checks as part of the annual report preparation." "Cell",1,2,3,4,5,6,7,8 "Accumulation period:","2/1/09-2/28/09","2/1/09-2/28/09","2/1/09-2/28/09","2/1/09-2/28/09","2/1/09-2/28/09","2/1/09-2/28/09","2/1/09-2/28/09","2/1/09-2/28/09"

400

CC 1 CAR 0 CAR 100 CAR 96 CC 2 CAR 1 CC 3 CAR 2 CAR 4 CC ...  

E-Print Network (OSTI)

CC 1 CAR 0 CAR 100 CAR 96 CC 2 CAR 1 CC 3 CAR 2 CAR 4 CC 4 CAR 3 CAR 99 CAR 97 CAR 98 CC 5 CAR 5 CAR 7 CAR 81 CAR 140 CAR 80 CAR 79 ...

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:51a6ca2f-b712-49f6-b1e8-7a3493668b2a | Open Energy Information  

Open Energy Info (EERE)

a6ca2f-b712-49f6-b1e8-7a3493668b2a a6ca2f-b712-49f6-b1e8-7a3493668b2a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wabash County Rural E M C Effective date: 2012/01/01 End date if known: Rate name: Single-Phase General Service, 37½ KVA or Less Sector: Commercial Description: Availability This rate is available for all single-phase non-residential and general power uses, requiring transformer capacity of 37½ KVA or less. Character of Service The type of service rendered under this rate schedule shall be alternating current, sixty (60) Hertz, single-phase at standard 120/240 voltage. The above rates are subject to purchased power cost tracking adjustments as charged to Wabash County REMC by its power supplier.

402

Radiation phantom with humanoid shape and adjustable thickness  

SciTech Connect

A radiation phantom comprising a body with a general humanoid shape and at least a portion having an adjustable thickness. In one embodiment, the portion with an adjustable thickness comprises at least one tissue-equivalent slice.

Lehmann, Joerg (Pleasanton, CA); Levy, Joshua (Salem, NY); Stern, Robin L. (Lodi, CA); Siantar, Christine Hartmann (Livermore, CA); Goldberg, Zelanna (Carmichael, CA)

2006-12-19T23:59:59.000Z

403

U.S. Shale Proved Reserves Adjustments (Billion Cubic Feet)  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) U.S. Shale Proved Reserves Adjustments (Billion Cubic Feet) U.S. Shale Proved Reserves Adjustments (Billion Cubic Feet) Decade Year-0...

404

An Approach to Adjusting Climatological Time Series for Discontinuous Inhomogeneities  

Science Conference Proceedings (OSTI)

A method is described whereby climatological time series of temperature and precipitation can be adjusted for station inhomogeneities using station history information. The adjusted data retains its original scale and is not an anomaly series. ...

Thomas R. Karl; Claude N. Williams Jr.

1987-12-01T23:59:59.000Z

405

Terminal Velocity Adjustments for Plate-like Crystals and Graupel  

Science Conference Proceedings (OSTI)

Velocity adjustments are evaluated for altitude changes using Reynolds number-Davies number correlations of the form Re = aXb which have been obtained from empirical fall velocities of ice particles. In general, the altitude adjustment was found ...

Kenneth V. Beard; Andrew J. Heymsfield

1988-11-01T23:59:59.000Z

406

Revision of DOE Manual 460.2-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2005 , 2005 TEC/WG 1 Revision of DOE M 460.2-1, Radioactive Material Transportation Practices Manual Revision of DOE M 460.2-1, Radioactive Material Transportation Practices Manual Ella McNeil Office of Transportation, EM-11 September 20, 2005 TEC/WG 2 Getting Started Getting Started * Establish an internal writing team, lead by EM: - Field Representatives - Naval Reactors - NNSA - RW * Kick-off on August 3 (conference call) * Second conference call on Sept. 8 September 20, 2005 TEC/WG 3 Proposed Revision Timeline Proposed Revision Timeline Writing team completes new draft of Manual 1/06 Begin informal DOE review of revised Manual (field, GC, PSOs) 2/06 (3 weeks) Comment resolution by writing team complete, provide draft to internal management for review 3/06 (2 weeks) Draft Manual is provided to SRGs

407

Cancer-Associated IDH1 Mutations Produce 2-hydroxyglutarate  

SciTech Connect

Mutations in the enzyme cytosolic isocitrate dehydrogenase 1 (IDH1) are a common feature of a major subset of primary human brain cancers. These mutations occur at a single amino acid residue of the IDH1 active site, resulting in loss of the enzyme's ability to catalyse conversion of isocitrate to {alpha}-ketoglutarate. However, only a single copy of the gene is mutated in tumours, raising the possibility that the mutations do not result in a simple loss of function. Here we show that cancer-associated IDH1 mutations result in a new ability of the enzyme to catalyse the NADPH-dependent reduction of {alpha}-ketoglutarate to R(-)-2-hydroxyglutarate (2HG). Structural studies demonstrate that when arginine 132 is mutated to histidine, residues in the active site are shifted to produce structural changes consistent with reduced oxidative decarboxylation of isocitrate and acquisition of the ability to convert {alpha}-ketoglutarate to 2HG. Excess accumulation of 2HG has been shown to lead to an elevated risk of malignant brain tumours in patients with inborn errors of 2HG metabolism. Similarly, in human malignant gliomas harbouring IDH1 mutations, we find markedly elevated levels of 2HG. These data demonstrate that the IDH1 mutations result in production of the onco-metabolite 2HG, and indicate that the excess 2HG which accumulates in vivo contributes to the formation and malignant progression of gliomas.

Dang, L.; White, D; Gross, S; Bennett, B; Bittinger, M; Driggers, E; Fantin, V; Jang, H; Jin, S; et al.

2009-01-01T23:59:59.000Z

408

Sonde Adjust Value-Added Product Technical Report  

DOE Green Energy (OSTI)

The Sonde Adjust (SONDEADJUST) value-added product (VAP) creates a file that includes all fields from original Atmospheric Radiation Measurement Climate Research Facility (ARM Facility) radiosonde files and contains several value-added fields that provide adjustments related to well-known humidity issues. SONDEADJUST produces data that correct documented biases in radiosonde humidity measurements. Previous efforts towards applying some of these corrections are available via the discontinued PI product sgpsondecorr1miloC1. Unique fields contained within this datastream include smoothed original relative humidity, dry bias corrected relative humidity, and final corrected relative humidity. The smoothed RH field refines the relative humidity from integers-the resolution of the instrument-to fractions of a percent. This profile is then used to calculate the dry bias corrected field. The final correction fixes the time-lag problem and uses the dry-bias field as input into the algorithm. In addition to dry bias, solar heating is another correction that is encompassed in the final corrected RH field. Output from SONDEADJUST differs from the previous RH-corrected datastreams in important ways. First, all three types of ARM radiosondes-Vaisala RS-80, RS-90, and RS-92-are corrected using dedicated procedures and/or parameters. Second, the output variables include all of those found in the original radiosonde file: dry bulb temperature, dewpoint temperature, wind speed, wind direction, eastward wind component, northward wind component, wind status (a Vaisala-produced field used in conjunction with the Loran system), ascent rate, and original relative humidity. Additional humidity fields are smoothed relative humidity, dry biased corrected relative humidity, final ambient relative humidity, and scaled adjusted relative humidity. Third, quality control (QC) flags of the fields from the original radiosonde datastream are brought into the SONDEADJUST output file. Additional QC variables are created for the new fields.

Troyan, D

2012-01-09T23:59:59.000Z

409

Scheme for rapid adjustment of network impedance  

DOE Patents (OSTI)

A static controlled reactance device is inserted in series with an AC electric power transmission line to adjust its transfer impedance. An inductor (reactor) is serially connected with two back-to-back connected thyristors which control the conduction period and hence the effective reactance of the inductor. Additional reactive elements are provided in parallel with the thyristor controlled reactor to filter harmonics and to obtain required range of variable reactance. Alternatively, the static controlled reactance device discussed above may be connected to the secondary winding of a series transformer having its primary winding connected in series to the transmission line. In a three phase transmission system, the controlled reactance device may be connected in delta configuration on the secondary side of the series transformer to eliminate triplen harmonics.

Vithayathil, John J. (3814 NE. 136th Pl., Portland, OR 97230)

1991-01-01T23:59:59.000Z

410

Remote Adjustable focus Raman Spectroscopy Probe  

DOE Patents (OSTI)

A remote adjustable focus Raman spectroscopy probe allows for analyzing Raman scattered light from a point of interest external to the probe. An environmental barrier including at least one window separates the probe from the point of interest. An optical tube is disposed adjacent to the environmental barrier and includes along working length compound lens objective next to the window. A beam splitter and a mirror are at the other end. A mechanical means is used to translate the probe body in the X, Y, and Z directions resulting in a variable focus optical apparatus. Laser light is reflected by the beam splitter and directed toward the compound lens objective, then through the window and focused on the point of interest. Raman scattered light is then collected by the compound lens objective and directed through the beam splitter to a mirror. A device for analyzing the light, such as a monochrometer, is coupled to the mirror.

Schmucker, John E.; Blasi, Raymond J.; Archer, William B.

1998-07-28T23:59:59.000Z

411

Adjustable shear stress erosion and transport flume  

DOE Patents (OSTI)

A method and apparatus for measuring the total erosion rate and downstream transport of suspended and bedload sediments using an adjustable shear stress erosion and transport (ASSET) flume with a variable-depth sediment core sample. Water is forced past a variable-depth sediment core sample in a closed channel, eroding sediments, and introducing suspended and bedload sediments into the flow stream. The core sample is continuously pushed into the flow stream, while keeping the surface level with the bottom of the channel. Eroded bedload sediments are transported downstream and then gravitationally separated from the flow stream into one or more quiescent traps. The captured bedload sediments (particles and aggregates) are weighed and compared to the total mass of sediment eroded, and also to the concentration of sediments suspended in the flow stream.

Roberts, Jesse D. (Carlsbad, NM); Jepsen, Richard A. (Carlsbad, NM)

2002-01-01T23:59:59.000Z

412

Elliptically polarizing adjustable phase insertion device  

DOE Patents (OSTI)

An insertion device for extracting polarized electromagnetic energy from a beam of particles is disclosed. The insertion device includes four linear arrays of magnets which are aligned with the particle beam. The magnetic field strength to which the particles are subjected is adjusted by altering the relative alignment of the arrays in a direction parallel to that of the particle beam. Both the energy and polarization of the extracted energy may be varied by moving the relevant arrays parallel to the beam direction. The present invention requires a substantially simpler and more economical superstructure than insertion devices in which the magnetic field strength is altered by changing the gap between arrays of magnets. 3 figures.

Carr, R.

1995-01-17T23:59:59.000Z

413

Remote adjustable focus Raman spectroscopy probe  

DOE Patents (OSTI)

A remote adjustable focus Raman spectroscopy probe allows for analyzing Raman scattered light from a point of interest external probe. An environmental barrier including at least one window separates the probe from the point of interest. An optical tube is disposed adjacent to the environmental barrier and includes a long working length compound lens objective next to the window. A beam splitter and a mirror are at the other end. A mechanical means is used to translated the prove body in the X, Y, and Z directions resulting in a variable focus optical apparatus. Laser light is reflected by the beam splitter and directed toward the compound lens objective, then through the window and focused on the point of interest. Raman scattered light is then collected by the compound lens objective and directed through the beam splitter to a mirror. A device for analyzing the light, such as a monochrometer, is coupled to the mirror.

Schmucker, John E. (Hurt, VA); Blasi, Raymond J. (Harrison City, PA); Archer, William B. (Bethel Park, PA)

1999-01-01T23:59:59.000Z

414

Data:E9d1a3ca-6534-4742-b5a6-9da2a1d41c72 | Open Energy Information  

Open Energy Info (EERE)

a3ca-6534-4742-b5a6-9da2a1d41c72 a3ca-6534-4742-b5a6-9da2a1d41c72 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: GSB Sector: Industrial Description: Source or reference: ISU Binder Source Parent: Comments Flat rate & fuel adjustment change month to month Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

415

15.4% CuIn1-XGaXSe2-Based Photovoltaic Cells from Solution-Based Precursor Films  

DOE Green Energy (OSTI)

We have fabricated 15.4%- and 12.4%-efficient CuIn1-XGaXSe2 (CIGS)-based photovoltaic devices from solution-based electrodeposition (ED) and electroless-deposition (EL) precursors. As-deposited precursors are Cu-rich CIGS. Additional In, Ga, and Se are added to the ED and EL precursor films by physical vapor deposition (PVD) to adjust the final film composition to CuIn1-XGaXSe2. The ED and EL device parameters are compared with those of a recent world record, an 18.8%-efficient PVD device. The tools used for comparison are current voltage, capacitance voltage, and spectral response characteristics.

Bhattacharya, R. N.; Batchelor, W.; Contreras, M. A.; Noufi, R. N. (National Renewable Energy Laboratory); Hiltner, J. F.; Sites, J. R. (Department of Physics, Colorado State University)

1999-05-25T23:59:59.000Z

416

1 4 7 7 3 2 4 5 7 3 1 2 4 8 F A X : 5 7 3 4 4 6 1  

E-Print Network (OSTI)

( ) 3 19 19 ( TEN) TEN 2011 2011 5000 3 19 ( ) #12;( ) ( ) ( ) #12;( ) EMBA11 3 20 TOYOTA 11 EMBA EMBA TOYOTA #12;1. 2. 3. 3 31 1. 3 26 2. 4 2 4 9 4 16 03-5715131 31369 03-5724872 kyhuang@mx.nthu.edu.tw 1. 4

Huang, Haimei

417

Table HC1.2.2 Living Space Characteristics by Average Floorspace  

U.S. Energy Information Administration (EIA) Indexed Site

2 Living Space Characteristics by Average Floorspace, " 2 Living Space Characteristics by Average Floorspace, " " Per Housing Unit and Per Household Member, 2005" ,,"Average Square Feet" ," Housing Units (millions)" ,,"Per Housing Unit",,,"Per Household Member" "Living Space Characteristics",,"Total1","Heated","Cooled","Total1","Heated","Cooled" "Total",111.1,2033,1618,1031,791,630,401 "Total Floorspace (Square Feet)" "Fewer than 500",3.2,357,336,113,188,177,59 "500 to 999",23.8,733,667,308,343,312,144 "1,000 to 1,499",20.8,1157,1086,625,435,409,235 "1,500 to 1,999",15.4,1592,1441,906,595,539,339 "2,000 to 2,499",12.2,2052,1733,1072,765,646,400

418

Categorical Exclusion Determinations: B2.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Categorical Exclusion Determinations: B2.1 Existing Regulations B2.1: Workplace enhancements Modifications within or contiguous to an existing structure, in a previously disturbed or developed area, to enhance workplace habitability (including, but not limited to, installation or improvements to lighting, radiation shielding, or heating/ventilating/air conditioning and its instrumentation, and noise reduction). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD September 11, 2013 CX-011028: Categorical Exclusion Determination

419

Particle creation in (2+1) circular dust collapse  

E-Print Network (OSTI)

We investigate the quantum particle creation during the circularly symmetric collapse of a 2+1 dust cloud, for the cases when the cosmological constant is either zero or negative. We derive the Ford-Parker formula for the 2+1 case, which can be used to compute the radiated quantum flux in the geometric optics approximation. It is shown that no particles are created when the collapse ends in a naked singularity, unlike in the 3+1 case. When the collapse ends in a BTZ black hole, we recover the expected Hawking radiation. 1

Sashideep Gutti; T. P. Singh

2007-01-01T23:59:59.000Z

420

Table HC1.2.4 Living Space Characteristics by Average Floorspace--Apartments, 2  

U.S. Energy Information Administration (EIA) Indexed Site

2.4 Living Space Characteristics by Average Floorspace--Apartments, 2005" 2.4 Living Space Characteristics by Average Floorspace--Apartments, 2005" ,,,"Average Square Feet per Apartment in a --" ," Housing Units (millions)" ,,,"2 to 4 Unit Building",,,"5 or More Unit Building" ,,"Apartments (millions)" "Living Space Characteristics",,,"Total","Heated","Cooled","Total","Heated","Cooled" "Total",111.1,24.5,1090,902,341,872,780,441 "Total Floorspace (Square Feet)" "Fewer than 500",3.1,2.3,403,360,165,366,348,93 "500 to 999",22.2,14.4,763,660,277,730,646,303 "1,000 to 1,499",19.1,5.8,1223,1130,496,1187,1086,696 "1,500 to 1,999",14.4,1,1700,1422,412,1698,1544,1348

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:7fab550d-d2c5-4f1e-8c7a-0da1b7cc916f | Open Energy Information  

Open Energy Info (EERE)

fab550d-d2c5-4f1e-8c7a-0da1b7cc916f fab550d-d2c5-4f1e-8c7a-0da1b7cc916f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Fennimore, Wisconsin (Utility Company) Effective date: 2008/08/15 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Sector: Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0508 per kilowatt-hour.

422

Data:8c4fb34e-4bf9-4e8f-abd2-a1c1c516e15b | Open Energy Information  

Open Energy Info (EERE)

fb34e-4bf9-4e8f-abd2-a1c1c516e15b fb34e-4bf9-4e8f-abd2-a1c1c516e15b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

423

Data:Dfe158ae-43ce-4f0a-b1e8-d65db2e5e7d1 | Open Energy Information  

Open Energy Info (EERE)

Dfe158ae-43ce-4f0a-b1e8-d65db2e5e7d1 Dfe158ae-43ce-4f0a-b1e8-d65db2e5e7d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Gresham, Wisconsin (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Primary Metering Discount with Excess Meter Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0627 per kilowatt-hour.

424

Induction of cytochromes P450 1A1 and 1A2 by tanshinones in human HepG2 hepatoma cell line  

Science Conference Proceedings (OSTI)

Diterpenoid tanshinones including tanshinone IIA (TIIA), cryptotanshinone (CTS), tanshinone I (TI) and dihydrotanshinone I (DHTI) are the major bioactive components from Danshen. The major aim of our present study was to investigate the induction potential of these four main components of tanshinones (TIIA, CTS, TI, and DHTI) on the expression of CYP1A1 and CYP1A2 in HepG2 cells. Our results showed that all of these four tanshinones caused a significant time- and concentration-dependent increase in the amount of CYP1A1/2 expression in HepG2 cells. These induction effects were further characterized through transcriptional regulation: the induction of CYP1A1/2 mRNA level by tanshinones was completely blocked by the transcription inhibitor actinomycin D; the expression of CYP1A1/2 heterogeneous nuclear RNA was induced by tanshinone treatment; and CYP1A1 mRNA stability was not influenced by these tanshinones. Interestingly, tanshinones plus B[a]P produced additive/synergistic effect on CYP1A1/2 induction. In addition, the tanshinone-induced CYP1A1/2 expression was abolished by the aryl hydrocarbon receptor (AhR) antagonist resveratrol, suggesting an AhR dependent transcription mechanism. In the reporter gene assay, while TI and DHTI significantly induced AhR-dependent luciferase activity, TIIA and CTS failed to induce this activity. Collectively, the tanshinones could induce CYP1A1 and CYP1A2 expression through transcriptional activation mechanism and exert differential effects on activating AhR in HepG2 cells. Our findings suggest that rational administration of tanshinones should be considered with respect to their effect on AhR and CYP1A1/2 expression.

Zhang Rong [Key Laboratory of Drug Metabolism and Pharmacokinetics, Key Unit of SATCM for Pharmacokinetics Methodology of TCM Complex Prescription, China Pharmaceutical University, Nanjing (China); Sun Jianguo, E-mail: jgsun_cpucn@yahoo.com.cn [Key Laboratory of Drug Metabolism and Pharmacokinetics, Key Unit of SATCM for Pharmacokinetics Methodology of TCM Complex Prescription, China Pharmaceutical University, Nanjing (China); Ma Liping; Wu Xiaolan [Key Laboratory of Drug Metabolism and Pharmacokinetics, Key Unit of SATCM for Pharmacokinetics Methodology of TCM Complex Prescription, China Pharmaceutical University, Nanjing (China); Pan Guoyu [Metabolism and Pharmacokinetics (MAP), Novartis Institute of Biomedical Research (NIBR), 250 Massachusetts Avenue, Cambridge, Massachusetts (United States); Hao Haiping; Zhou Fang; Jiye, A; Liu Changhui; Ai Hua; Shang Lili; Gao Haiyan; Peng Ying; Wan Ping; Wu Hui [Key Laboratory of Drug Metabolism and Pharmacokinetics, Key Unit of SATCM for Pharmacokinetics Methodology of TCM Complex Prescription, China Pharmaceutical University, Nanjing (China); Wang Guangji, E-mail: guangjiwang@hotmail.com [Key Laboratory of Drug Metabolism and Pharmacokinetics, Key Unit of SATCM for Pharmacokinetics Methodology of TCM Complex Prescription, China Pharmaceutical University, Nanjing (China)

2011-04-01T23:59:59.000Z

425

Data:A06048b8-8f65-4a2c-98fb-8eaf59d7f1d1 | Open Energy Information  

Open Energy Info (EERE)

48b8-8f65-4a2c-98fb-8eaf59d7f1d1 48b8-8f65-4a2c-98fb-8eaf59d7f1d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of River Falls, Wisconsin (Utility Company) Effective date: 2010/03/26 End date if known: Rate name: Cp-1 Small Power Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0662 per kilowatt-hour.

426

Halogenated 1'-methyl-1,2'-bipyrroles (MBPs) in the Norwestern Atlantic  

E-Print Network (OSTI)

Halogenated 1'-methyl-1,2'-bipyrroles (MBPs) are a distinctive class of marine organic compounds. They are naturally produced, they have a unique carbon structure, they are highly halogenated, and they bioaccumulate in ...

Pangallo, Kristin C

2009-01-01T23:59:59.000Z

427

Data:2e81ccdb-ac2d-441a-85a1-27032b469406 | Open Energy Information  

Open Energy Info (EERE)

ccdb-ac2d-441a-85a1-27032b469406 ccdb-ac2d-441a-85a1-27032b469406 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Lansdale, Pennsylvania (Utility Company) Effective date: 2013/01/16 End date if known: Rate name: Primary Service Rate with Transformer Rental Sector: Industrial Description: This rate is subject to the Purchase Power Cost Adjustment. An additional charge of $27.00 for each polyphase transformer provided by the Borough is applicable upon rental. Source or reference: http://www.lansdale.org/vertical/Sites/%7B862B0D24-07B5-47AF-8DA9-6A7934A26ACB%7D/uploads/Motion_F_Res._13-02_revise_electric_rates_fees_etc._1.16.13.pdf

428

Data:D778d187-814c-4ef1-b2b0-cdbab7867466 | Open Energy Information  

Open Energy Info (EERE)

8d187-814c-4ef1-b2b0-cdbab7867466 8d187-814c-4ef1-b2b0-cdbab7867466 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: MSB Sector: Industrial Description: Source or reference: ISU binder Source Parent: Comments flat rate & fuel cost adjustment change monthly Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

429

Performance and Budget Staff (HC-1.2)  

Energy.gov (U.S. Department of Energy (DOE))

The mission of the Performance and Budget Staff (HC-1.2) is to support the effective and efficient implementation of human capital initiatives and functions, in line with the missions and goals of...

430

I[?2] can be the nonstationary ideal on Cof(?1)  

E-Print Network (OSTI)

We answer a question of Shelah by showing that it is consistent that every member of I[#2 ] Cof(#1 ) is nonstationary if and only if it is consistent that that there is a # -Mahlo cardinal #.

William Mitchell

2004-01-01T23:59:59.000Z

431

Microsoft Word - TR_Parametric_R1-V2.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

IMPACT OF OPERATING PARAMETERS ON FINE PARTICULATE EMISSIONS FROM NATURAL GAS-FIRED COMBINED CYCLE AND COGENERATION POWER PLANTS February 2005 CEC-500-2005-036 Revision 1.2,...

432

1 Introduction to Information Retrieval 2 Information Retrieval Models  

E-Print Network (OSTI)

1 Introduction to Information Retrieval 2 Information Retrieval Models Mounia Lalmas Yahoo! Research Barcelona Information Retrieval Summer School 2011 Bangalore, India Mounia Lalmas (Yahoo! Research and evaluation (INEX) Quantum theory to model interactive information retrieval Aggregated search Bridging

Lalmas, Mounia

433

1 Beyond Graphene - Novel Nanosheets of 2D Crystalline Materials ...  

Science Conference Proceedings (OSTI)

that graphene, a 2D nanosheet form of carbon, can exist as a stable material and exceptional properties that are not observed in 3D or 1D form of carbon are...

434

Zwischenbericht zum DFG-Forschungsvorhaben NE 902/2-1 SCHR 570/6-1  

E-Print Network (OSTI)

.3 Anwendungsperspektiven. . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 4 Arbeits- und Ergebnisbericht 10 4.3 Wissenschaftliche Mitarbeiter/in Dipl.-Ing. Vera Ebbing Besch¨aftigungszeitraum: seit 1. Oktober 2006 1.4 Fachgebiet;Zwischenbericht zum DFG-Forschungsvorhaben NE 902/2-1 SCHR 570/6-1 10 4 Arbeits- und Ergebnisbericht Basierend auf

Neff, Patrizio

435

Adjustment of ablation shapes and subwavelength ripples based on electron dynamics control by designing femtosecond laser pulse trains  

SciTech Connect

A quantum model is proposed to investigate femtosecond laser pulse trains processing of dielectrics by including the plasma model with the consideration of laser particle-wave duality. Central wavelengths (400 nm and 800 nm) strongly impact the surface plasmon field distribution, the coupling field intensity distribution (between the absorbed intensity and the surface plasma), and the distribution of transient localized free electron density in the material. This, in turn, significantly changes the localized transient optical/thermal properties during laser materials processing. The effects of central wavelengths on ablation shapes and subwavelength ripples are discussed. The simulation results show that: (1) ablation shapes and the spacing of subwavelength ripples can be adjusted by localized transient electron dynamics control using femtosecond laser pulse trains; (2) the adjustment of the radii of ablation shapes is stronger than that of the periods of subwavelength ripples.

Yuan Yanping; Jiang Lan; Li Xin; Wang Cong [Laser Micro/Nano-Fabrication Laboratory, School of Mechanical Engineering, Beijing Institute of Technology, Beijing 100081 (China); Lu Yongfeng [Department of Electrical Engineering, University of Nebraska-Lincoln, Lincoln, Nebraska 68588-0511 (United States)

2012-11-15T23:59:59.000Z

436

Data:1cee2f9e-97b4-4d01-afeb-72695a2cad92 | Open Energy Information  

Open Energy Info (EERE)

f9e-97b4-4d01-afeb-72695a2cad92 f9e-97b4-4d01-afeb-72695a2cad92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2008/01/01 End date if known: Rate name: Industrial Renewable Energy Rider Sector: Industrial Description: Service under this rate is available to all customers currently served under Rate Schedules Cp-1, Cp-2 and Cp-3. This rider allows customers the option of purchasing blocks of their energy from renewable resources. Renewable energy will be sold only in blocks of 300kWh per Month with a minimum of 100 blocks per month, i.e $2.00 per 300 kWh block of renewable energy per month. Customer choosing to be served under this rider will pay the Block Charge or Renewable Energy in addition to their regular monthly charges under the listed Rate Schedules. All of the provisions and the charges of the current applicable rate, including the Power Cost Adjustment Clause, will apply to the customer's total energy usage

437

Data:1871a706-55e1-476c-9cb3-e3aa4811b0d2 | Open Energy Information  

Open Energy Info (EERE)

a706-55e1-476c-9cb3-e3aa4811b0d2 a706-55e1-476c-9cb3-e3aa4811b0d2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Tariff B2: Single Phase Commercial, Greater Than 400 Amps Sector: Commercial Description: The charges derived in the Tariff B2 rate are subject to adjustment for: Purchased Power Adjustment Tracking Factor. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

438

Data:66d59b9d-7b2c-4a84-bfdf-a2e1a3c4c628 | Open Energy Information  

Open Energy Info (EERE)

7b2c-4a84-bfdf-a2e1a3c4c628 7b2c-4a84-bfdf-a2e1a3c4c628 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

439

Data:1d6ed54d-3ca1-4e2f-b6a3-478cd84c2daa | Open Energy Information  

Open Energy Info (EERE)

4d-3ca1-4e2f-b6a3-478cd84c2daa 4d-3ca1-4e2f-b6a3-478cd84c2daa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy New Orleans Inc Effective date: 2009/06/01 End date if known: Rate name: Outdoor Night watchman service HPS Sector: Lighting Description: Applicable to electric service for the operation of overhead automatically controlled all night outdoor lighting service for lighting private streets, alleys, or any area of the premises, or lighting on public streets subject to any requirements of local municipal authorities. Available at all points throughout the territory served by the company where existing facilities of suitable phase and voltage are adjacent to the premises to be served, and service is taken in accordance with the terms and conditions of the service standards and service regulations of the company. Fixed monthly charge will be per 100 w lamp installed on existing pole(s) and where suitable phase and voltage are available, plus any applicable adjustments. For a one pole extension, the charge will be $3.89 per pole.

440

1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NPI, Inc. NPI, Inc. NPS i ENVIRONMENTAL PURCHASING IN THE NATIONAL PARK SERVICE: A HOW-TO GUIDE Table of Contents 1.0 Introduction 1-1 1.1 Context for Environmental Purchasing 1-1 1.2 Intended Audience 1-2 1.3 Objectives and Scope of Guide 1-3 2.0 Government Mandates Relating To Environmental Purchasing 2-1 2.1 Legislative Mandates 2-1

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

On a Theorem on sums of the form 1+2^(2^n)+2^(2^n+1)+...+2^(2^n+m) and a result linking Fermat with Mersenne numbers  

E-Print Network (OSTI)

In his book "250 Problems in Elementary Number Theory", W.Sierpinski shows that the numbers 1+2^(2^n)+2^(2^n+1) are divisible by 21; for n=1,2,.... In this paper, we prove a similar but more general result.Consider the natural numbers of the form I(n.m)= 1+2^(2^n)+2^(2^n+1)+...+2^(2^n+m).In Theorem 1 we prove that for every odd integer N greater than 1, there exist infinitely many natural numbers n and m such that the integers I(n.m) are divisible by N. We give an explicit construction of the numbers n and m, for a given N. As an example, when N=31, and with n=4k and m=94+124i, the numbers I(n,m) are divisible by 31. A similar example is offered for N=(31)(7)=217. In Theorem 2, we prove a result pertaining to Mersenne numbers.There are also three Corollaries in this work, one of which deals with Fermat numbers.

Konstantine "Hermes" Zelator

2008-06-09T23:59:59.000Z

442

Nation Weekly January 2, 2005, Volume 1, Number 37  

E-Print Network (OSTI)

cover.pm6 12/25/04, 10:23 PM1 cover.pm6 12/25/04, 3:56 AM2 #1;e are second to none when it comes to comfortable journey, punctual operation and high quality service. Our friendly staff are always at your service. uddha Air is the first and only...

Upadhyay, Akhilesh

443

Revised: September 24, 2013 Page 1 of 2  

E-Print Network (OSTI)

Revised: September 24, 2013 Page 1 of 2 ISP Certification Audit Checklist Certification for: (Area Sample Physical Inspection Locations YES NO 6.1 Are PPE hazard assessments and their certifications.3 Are minimum HCP requirements met for all applicable areas? 6.4 Are minimum CHP requirements met for all

Jiang, Wen

444

Page 1 of 2 Revised 8 February 2013 UBC Utilities  

E-Print Network (OSTI)

(Pre-board,1,2,3 or 4) Part 3. MECHANICAL SERVICES: WATER, SANITARY, STORM, GAS, and DISTRICT HEATING 3 (c). Gas and District Heating Distribution · Service to meet requirements of UBC Technical Guidelines Division 2, Section 02685 (gas) and Section (TBA-District Heating ­ contact UBC Utilities. · Fax

Vellend, Mark

445

Data:1b10a960-14e0-4c1d-9c2e-74500bc82f14 | Open Energy Information  

Open Energy Info (EERE)

a960-14e0-4c1d-9c2e-74500bc82f14 a960-14e0-4c1d-9c2e-74500bc82f14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Street Lighting- 200W HPS- Ornamental- Aluminum Pole Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. The lighting pole charge applies if the lamp is on a dedicated pole that is not used to support the utility distribution system. Pole Charge: $3.00 per pole, per month. The Power Cost Adjustment Clause applies to this rate.

446

Single crystal growth and superconductivity of Ca(Fe1-xCox)2As2  

SciTech Connect

We report the single crystal growth of Ca(Fe1-xCox)2As2 (0 <= x <= 0.082) from Sn flux. The temperature-composition phase diagram is mapped out based on the magnetic susceptibility and electrical transport measurements. Phase diagram of Ca(Fe1-xCox)2As2 is qualitatively different from those of Sr and Ba, it could be due to both the charge doping and structural tuning effects associated with Co substitution.

Hu, Rongwei; Ran, Sheng; Budko, Serguei; Straszheim, Warren E.; Canfield, Paul C.

2012-05-18T23:59:59.000Z

447

Data:55c764f6-2a97-472b-b3f1-4d9c1d9d0a66 | Open Energy Information  

Open Energy Info (EERE)

f6-2a97-472b-b3f1-4d9c1d9d0a66 f6-2a97-472b-b3f1-4d9c1d9d0a66 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elroy, Wisconsin (Utility Company) Effective date: 2009/01/22 End date if known: Rate name: Cp-3 Industrial Power Service over 500kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0510 per kilowatt-hour.

448

1 1 vital Not a member of the UN 1 2 okay Applied for ...  

Science Conference Proceedings (OSTI)

... residents report being terrorized by Russian troops in the troops efforts to crush Chechan rebels 47 1 vital Norway and OPEC negotiated over cuts. ...

2004-10-26T23:59:59.000Z

449

Revision of DOE Manual 460.2-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 TEC/WG 1 Revision of DOE M 460.2-1, Radioactive Material Transportation Practices Manual Revision of DOE M 460.2-1, Radioactive Material Transportation Practices Manual DOE Writing Team March 2006 TEC/WG 2 Proposed Revision Timeline Proposed Revision Timeline Complete new draft of Manual 2/06 Draft Manual provided to Manual Review Topic Group for review & comment 3/14/06 Comments due from Topic Group 5/01/06 Final draft Manual 7/06 Comment resolution (thru conference calls with Topic Group, as needed) 6/06 March 2006 TEC/WG 3 Proposed Timeline (contd.) Proposed Timeline (contd.) Manual is submitted into the formal Directives process 9/06 Manual reissued 12/06 March 2006 TEC/WG 4 Major Changes Made to the Manual Major Changes Made to the Manual * Clarification/update of information relative

450

Method for preparation of 7-hydroxy-1,2,3,4-tetrahydroquinoline from 1,2,3,4-tetrahydroquinoline  

DOE Patents (OSTI)

Methods for the efficient preparation of 7-hydroxy-1,2,3,4-tetrahydroquinoline include a first method in which the acylation of m-aminophenol obtains a lactam which is reduced to give the desired quinoline and a second method in which tetrahydroquinoline is nitrated and hydrogenated and then hydrolyzed to obtain the desire quinoline. 7-hydroxy-1,2,3,4-tetrahydroquinoline is used in the efficient synthesis of four lasing dyes of the rhodamine class.

Field, G.; Hammond, P.R.

1994-02-01T23:59:59.000Z

451

Data:D94017ce-7451-464a-8a19-c2a9d1ddddef | Open Energy Information  

Open Energy Info (EERE)

7451-464a-8a19-c2a9d1ddddef 7451-464a-8a19-c2a9d1ddddef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Ms-2 Athletic Field Lighting Service 1,500 W Q Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0644 per kilowatt-hour.

452

Data:E024d871-181c-4fd0-a2db-fba048ef01d1 | Open Energy Information  

Open Energy Info (EERE)

4d871-181c-4fd0-a2db-fba048ef01d1 4d871-181c-4fd0-a2db-fba048ef01d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Troy, Indiana (Utility Company) Effective date: End date if known: Rate name: Schedule A:Commercial Sector: Commercial Description: Rate is subject to a Purchased Power Cost Adjustment Tracking Factor. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

453

Data:3e46d77e-2205-4395-bd30-8b4c2ab273a1 | Open Energy Information  

Open Energy Info (EERE)

e-2205-4395-bd30-8b4c2ab273a1 e-2205-4395-bd30-8b4c2ab273a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alaska Village Elec Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Residential Rate: Selawik Village Sector: Residential Description: For 1-500 kWh consumed: Rate = ( .30 + Cost of Fuel) - (PCE Adjustment) For 501-700 kWh consumed: Rate = (.30 + Cost of Fuel) Over 700 kWh consumed: Rate = (.20 + Cost of Fuel) Source or reference: http://www.avec.org/customer-service.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

454

Data:F0c83419-8a64-42bb-8780-adf1d0d2fb09 | Open Energy Information  

Open Energy Info (EERE)

19-8a64-42bb-8780-adf1d0d2fb09 19-8a64-42bb-8780-adf1d0d2fb09 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alaska Village Elec Coop, Inc Effective date: 2012/01/06 End date if known: Rate name: Large Power- GS-2: Elim Village Sector: Industrial Description: Note: The Adjustments entered here is the sum of the "Cost of Fuel" and the "RCC". Source or reference: Rates Binder B Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

455

Data:9a350bb9-c067-48a8-9c33-c2d209b1f650 | Open Energy Information  

Open Energy Info (EERE)

50bb9-c067-48a8-9c33-c2d209b1f650 50bb9-c067-48a8-9c33-c2d209b1f650 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Tariff E1, 2000 or Greater KVA Three Phase Large Power Sector: Industrial Description: The charges derived in the Tariff E rate are subject to adjustment for: Purchased Power Adjustment Tracking Factor. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

456

(2,2-Bipyridyl)bis(eta5-1,2,3,4,5-pentamethylcyclopentadienyl)Strontium(II)  

SciTech Connect

In the title compound, the Sr-N distances are 2.624 (3) and 2.676 (3) Angstroms. The Sr-centroid distances are 2.571 and 2.561 Angstroms. The N-C-C-N torsion angle in the bipyridine ligand is 2.2 (4){sup o}. Interestingly, the bipyridine ligand is tilted. The angle between the plane defined by Sr1, N1 and N2 and the plane defined by the 12 atoms of the bipyridine ligand is 10.7{sup o}.

Kazhdan, Daniel; Kazhdan, Daniel; Hu, Yung-Jin; Kokai, Akos; Levi, Zerubba; Rozenel, Sergio

2008-07-03T23:59:59.000Z

457

Modernization of Legacy Application Software Jeffrey Howe 1 , Scott B. Baden 1 , Tamara Grimmett 2 , and Keiko Nomura 2  

E-Print Network (OSTI)

memory capacity. For example, the Cray T94 at the San Diego Supercomputer Center has only about 2 Gigabytes of memory, but just 8 nodes of SDSC's 128­ node IBM SP2 provide this same memory capacity. 1 We capacity. We discuss our methodology for parallelizing this application and present performance

Baden, Scott B.

458

D2L-D4L1.xls  

NLE Websites -- All DOE Office Websites (Extended Search)

2 QUENCH TESTS 2 QUENCH TESTS 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 0 2 4 6 8 10 12 14 16 18 20 QUENCH NUMBER QUENCH CURRENT (A) Quench Level - No Quench 7 TeV (6015A) 7.56 TeV (6505A) no warm bore tube liquid helium bath cooling forced flow cooling no warm bore tube 7-June-2002 J. F. Muratore Brookhaven National Lab D2L102 QUENCH SUMMARY Magcool Bay C ________________________________________________________________________________ QUENCH RUN CURRENT T1 T4 START MIITS COIL COMMENTS # # (A) (K) (K) (ms) ________________________________________________________________________________ T = 4.5K (nom)

459

Tissue inhibitor of metalloproteinase-2 (TIMP-2) regulates myogenesis and {beta}1 integrin expression in vitro  

Science Conference Proceedings (OSTI)

Myogenesis in vitro involves myoblast cell cycle arrest, migration, and fusion to form multinucleated myotubes. Extracellular matrix (ECM) integrity during these processes is maintained by the opposing actions of matrix metalloproteinase (MMP) proteases and their inhibitors, the tissue inhibitor of metalloproteinases (TIMPs). Here, we report that TIMP-2, MMP-2, and MT1-MMP are differentially expressed during mouse myoblast differentiation in vitro. A specific role for TIMP-2 in myogenesis is demonstrated by altered TIMP-2{sup -/-} myotube formation. When differentiated in horse serum-containing medium, TIMP-2{sup -/-} myotubes are larger than wild-type myotubes. In contrast, when serum-free medium is used, TIMP-2{sup -/-} myotubes are smaller than wild-type myotubes. Regardless of culture condition, myotube size is directly correlated with MMP activity and inversely correlated with {beta}1 integrin expression. Treatment with recombinant TIMP-2 rescues reduced TIMP-2{sup -/-} myotube size and induces increased MMP-9 activation and decreased {beta}1 integrin expression. Treatment with either MMP-2 or MMP-9 similarly rescues reduced myotube size, but has no effect on {beta}1 integrin expression. These data suggest a specific regulatory relationship between TIMP-2 and {beta}1 integrin during myogenesis. Elucidating the role of TIMP-2 in myogenesis in vitro may lead to new therapeutic options for the use of TIMP-2 in myopathies and muscular dystrophies in vivo.

Lluri, Gentian; Langlois, Garret D. [Department of Anatomy and Neurobiology, University of Vermont College of Medicine, 149 Beaumont Ave., HSRF 418, Burlington, VT 05405 (United States); Soloway, Paul D. [Division of Nutritional Sciences, Cornell University, Ithaca, NY 14853 (United States); Jaworski, Diane M. [Department of Anatomy and Neurobiology, University of Vermont College of Medicine, 149 Beaumont Ave., HSRF 418, Burlington, VT 05405 (United States)], E-mail: diane.jaworski@uvm.edu

2008-01-01T23:59:59.000Z

460

Increasing and decreasing sub 3 1 8 4 9 6 7 2 5 (i.s.)  

E-Print Network (OSTI)

Beauregard Robinson S = Craige Schensted (= Ea Ea) K = Donald Ervin Knuth 6 #12; w = 4132: 4 1 1 3 1 2 1 2 1

Note: This page contains sample records for the topic "adjustments 1 2" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Unitary irreducible representations of SL(2,C) in discrete and continuous SU(1,1) bases  

Science Conference Proceedings (OSTI)

We derive the matrix elements of generators of unitary irreducible representations of SL(2,C) with respect to basis states arising from a decomposition into irreducible representations of SU(1,1). This is done with regard to a discrete basis diagonalized by J{sup 3} and a continuous basis diagonalized by K{sup 1}, and for both the discrete and continuous series of SU(1,1). For completeness, we also treat the more conventional SU(2) decomposition as a fifth case. The derivation proceeds in a functional/differential framework and exploits the fact that state functions and differential operators have a similar structure in all five cases. The states are defined explicitly and related to SU(1,1) and SU(2) matrix elements.

Conrady, Florian [Perimeter Institute for Theoretical Physics, Waterloo, Ontario (Canada); Hnybida, Jeff [Perimeter Institute for Theoretical Physics, Waterloo, Ontario (Canada); Department of Physics, University of Waterloo, Waterloo, Ontario (Canada)

2011-01-15T23:59:59.000Z

462

Optimally Orienting Physical Networks Dana Silverbush ,1, Michael Elberfeld ,2, and Roded Sharan1  

E-Print Network (OSTI)

Optimally Orienting Physical Networks Dana Silverbush ,1, Michael Elberfeld ,2, and Roded Sharan1 1, elberfeld@tcs.uni-luebeck.de Abstract. In a network orientation problem one is given a mixed graph, consisting of directed and undirected edges, and a set of source-target vertex pairs. The goal is to orient

Sharan, Roded

463

Data:C1bb69c9-96f2-4d2f-b939-1755bc17809f | Open Energy Information  

Open Energy Info (EERE)

9c9-96f2-4d2f-b939-1755bc17809f 9c9-96f2-4d2f-b939-1755bc17809f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitewater Valley Rural EMC Effective date: 2011/01/01 End date if known: Rate name: Schedule GS - General Service Single Phase Sector: Commercial Description: Available for all NON residential purposes. This rate is subject to Wholesale Power Cost Adjustment. Source or reference: http://www.wwvremc.com/documents/Schedule_GS_General_Service.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

464

Uncertainty Analysis of Otway CO2 Sequestration Project Shohreh Amini 1,2  

E-Print Network (OSTI)

is certainly dissolved in to the water phase. In order to model the CO2 solubility, a fluid model was generated,2, , Razi Gaskari3 , Grant Bromhal 1 (1 National Energy Technology Laboratory-Regional University Alliance was followed by extracting some static and dynamic data from a handful of simulation runs to construct a spatio

Mohaghegh, Shahab

465

Alex Galis1, Jean-Patrick Gelas2, Laurent Lefvre2, Kun Yang1 1 University College London, UK  

E-Print Network (OSTI)

set out by the Smart Grid Architecture Model [12], our work focuses on microgrid and customer premises] "Report on the reference architecture for the smart grid. draft version," 2012. [13] S. S. S. R. Depuru, L1 Representation and Self-Configuration of Physical Entities in Extended Smart Grid Perimeter Zheng

Lefèvre, Laurent

466

Data:2d0e9d6b-e305-4a1e-ae9e-4aa1cf2621a4 | Open Energy Information  

Open Energy Info (EERE)

e9d6b-e305-4a1e-ae9e-4aa1cf2621a4 e9d6b-e305-4a1e-ae9e-4aa1cf2621a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand 7am-9pm with Parallel Generation(20 kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour.

467

Associated-Dissolved Natural Gas Reserves Adjustments, Wet After Lease  

Gasoline and Diesel Fuel Update (EIA)

-54 276 455 877 -482 390 1979-2011 -54 276 455 877 -482 390 1979-2011 Federal Offshore U.S. 0 -4 7 12 -14 -22 1990-2011 Pacific (California) 1 -5 0 1 1 -1 1979-2011 Louisiana & Alabama 0 0 8 7 -14 -21 1981-2011 Texas -1 1 -1 4 -1 0 1981-2011 Alaska -1 1 -1 1 -1 -1 1979-2011 Lower 48 States -53 275 456 876 -481 391 1979-2011 Alabama 1 -1 0 5 13 3 1979-2011 Arkansas 3 -7 3 12 -3 24 1979-2011 California -62 6 1 6 7 929 1979-2011 Coastal Region Onshore -64 2 1 2 2 15 1979-2011 Los Angeles Basin Onshore -1 2 4 4 3 6 1979-2011 San Joaquin Basin Onshore 2 3 -4 -2 2 907 1979-2011 State Offshore 1 -1 0 2 0 1 1979-2011 Colorado -2 9 -4 14 68 -38 1979-2011 Florida 1 -1 78 6 31 -28 1979-2011 Kansas 3 8 4 -5 -2 -4 1979-2011

468

Neutrino Factory Feasibility Study - 2-1 - April 15  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 - April 15 2-1 - April 15 th , 2000 2. Introduction A muon storage ring as a source of intense neutrino beams supersedes a standard neutrino source in many ways. Classical neutrino sources have long decay channels which are used to generate ν µ,e ,ν µ,e beams from pions coming from a target that is hit with an intense proton beam. In a muon storage ring the muons circulate after injection until they decay. A fraction of these muons will decay in the straight section, which will produce an intense, well collimated neutrino beam. If the muon beam divergence in the straight section is small compared to the decay angle, the opening angle of the neutrino beam is completely dominated by the decay kinematics. Given the energy of the muons this angle basically equals 1

469

Home Energy Saver Web Site Documentation Version 1.2  

NLE Websites -- All DOE Office Websites (Extended Search)

Saver Web Site Documentation Version 1.2 Saver Web Site Documentation Version 1.2 LBNL-51938 Documentation of Calculation Methodology, Input Data, and Infrastructure for the Home Energy Saver Web Site Margaret J. Pinckard, Richard E. Brown, Evan Mills, James D. Lutz, Mithra M. Moezzi, Celina Atkinson, Chris Bolduc, Gregory K. Homan, Katie Coughlin VERSION 1.2 July 2005 Energy Analysis Department Environmental Energy Technologies Division Ernest Orlando Lawrence Berkeley National Laboratory University of California Berkeley, CA 94720 USA This work was supported by the Assistant Secretary for Energy Efficiency and Renewable Energy, Office of Building Technology, State, and Community Programs of the U.S. Department of Energy under Contract No. DE-

470

MELCOR 1.8.2 assessment: The MP-1 and MP-2 late phase melt progression experiments  

SciTech Connect

MELCOR is a fully integrated, engineering-level computer code being developed at Sandia National Laboratories for the USNRC, that models the entire spectrum of severe accident phenomena in a unified framework for both BWRs and PWRs. As a part of an ongoing assessment program, MELCOR has been used to model the MP-1 and MP-2 experiments, which provided data for late-phase melt progression in PWR geometries. Core temperature predicted by MELCOR were within 250--500 K of measured data in both MP-1 and MP-2. Relocation in the debris bed and metallic crust regions of MP-2 was predicted accurately compared to PIE data. Temperature gradients in lower portions of the test bundle were not predicted well in both MP-1 and MP-2, due to the lack of modeling of the heat transfer path to the cooling jacket in those portions of the test bundles. Fifteen sensitivity studies were run on various core (COR), control volume hydrodynamics (CVH) and heat structures (HS) package parameters. No unexpected sensitivities were found, and in particular there were no sensitivities to reduced time step, finer nodalization or to computer platform. Calculations performed by the DEBRIS and TAC2D codes for MP-1 and MP-2 showed better agreement with measured data than those performed by MELCOR. This was expected, through, due to the fully 2-dimensional modeling used in the other codes.

Tautges, T.J. [Sandia National Labs., Albuquerque, NM (United States). Thermal/Hydraulic Analysis Dept.

1994-05-01T23:59:59.000Z

471

11 Windows and Panels page 2 11.1 Pixel and User Coordinates 2  

E-Print Network (OSTI)

Contents 11 Windows and Panels page 2 11.1 Pixel and User Coordinates 2 11.2 Creation, Opening, and Closing of a Window 4 11.3 Colors 5 11.4 Window Parameters 7 11.5 Window Coordinates and Scaling 9 11 of a Window 33 11.15 Displaying Three­Dimensional Objects: d3 window 44 Bibliography 46 Index 47 1 #12; 11

472

DOE G 435.1-1, Crosswalk Tables: DOE O 5820.2A vs. DOE O 435.1/M 435.1-1  

Directives, Delegations, and Requirements

These crosswalk tables have been prepared to assist in understanding how the requirements that are currently in 5820.2A are addressed in the DOE O 435.1 and ...

1999-07-09T23:59:59.000Z

473

Microsoft Word - AcqGuide1pt2.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-Chapter 1.2 (January 2007) -Chapter 1.2 (January 2007) 1 Head of Contracting Acitivty (HCA) Authority, Functions, and Responsilitites [Reference: FAR 1.601] Overview This chapter provides a summary of HCA authorities based on statute, FAR, DEAR, and DOE Orders. It serves as a general guide to the authorities that may be conferred via a formal delegation of HCA authority from the Department of Energy Senior Procurement Executive. This formal delegation prescribes the specific source and scope of the HCA's authority with respect to that individual's contracting actions. HCA delegations are unique and specific to the individual program or field activity, based on mission, workload, performance and other factors considered by the DOE Senior Procurement Executive.

474

Overview of NEMS-H2, Version 1.0  

NLE Websites -- All DOE Office Websites (Extended Search)

NEMS-H2, Version 1.0 NEMS-H2, Version 1.0 Frances Wood OnLocation, Inc., Energy Systems Consulting (fwood@onlocationinc.com) January 26, 2006 OnLocation, Inc., Energy Systems Consulting 2 Today's Presentation * Overview of NEMS-H2 Structure * Current Status * New Hydrogen Market Module (HMM) * Transportation Module Modifications * Preliminary Test Runs * Looking Ahead to Next Phase OnLocation, Inc., Energy Systems Consulting 3 NEMS Overview * The National Energy Modeling System (NEMS) was developed and is maintained by EIA - Annual Energy Outlook projections - Congressional as well as agency requests * NEMS has also been used extensively outside of EIA - Various National Laboratories studies - National Commission on Energy Policy - Program offices within DOE for R&D benefits estimation * Modular structure allows each sector to be represented by

475

Data:A0fee6a1-2aa1-4217-9458-cb95314b2738 | Open Energy Information  

Open Energy Info (EERE)

fee6a1-2aa1-4217-9458-cb95314b2738 fee6a1-2aa1-4217-9458-cb95314b2738 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2009/10/01 End date if known: Rate name: RIDER FOR FOND DU LAC RESERVATION BUSINESS LICENSE FEE Sector: Description: APPLICATION Applicable to billings for electric service provided within the Fond du Lac Reservation located in the southern portion of St. Louis County and the northern portion of Carlton County, Minnesota. ADJUSTMENT In accordance with the Corporate Code, Business License System and Employment Rights Law contained in the Fond du Lac Reservation Ordinance 5/84, businesses operating within the Reservation shall pay an assessment of 0.5 percent on revenues from sales within the Reservation. Therefore, there shall be added to each customer's monthly electric service bill a Fond du Lac Reservation Business License Fee assessment. The amount of the fee to be assessed shall be the applicable Assessment Rate multiplied by the Customer's bill for electric service. Compliance by Minnesota Power with the Business License System is governed by the terms of an agreement dated September 25, 1985, as amended by letter dated January 6, 1986, made with the Reservation Business Committee. Since the License Fee assessable by Minnesota Power applies retroactively to October 2, 1985, the initial Assessment Rate shall be 1.0 percent until such time as all retroactive amounts have been collected. Thereafter, the Assessment Rate shall be 0.5 percent.

476

Data:596eb2f6-b9e2-4dac-abc8-d1f2fc9065d1 | Open Energy Information  

Open Energy Info (EERE)

f6-b9e2-4dac-abc8-d1f2fc9065d1 f6-b9e2-4dac-abc8-d1f2fc9065d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Dover, Delaware (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Private Outdoor Lighting: Roadway/Area Lighting, Metered, 175 watt MV Sector: Lighting Description: "METERED- This classification will be available at the City's discretion and only when it is not feasible to install the lighting service from an unmetered source. These lights will have the energy supplied through the customers meter and the monthly rental fee shall be reduced to reflect this customers expense."

477

D2L-D4L1.xls  

NLE Websites -- All DOE Office Websites (Extended Search)

1 QUENCH TESTS 1 QUENCH TESTS 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 0 2 4 6 8 10 12 14 16 18 20 QUENCH NUMBER QUENCH CURRENT (A) Liquid Cooling Forced Flow Cooling 7 TeV (6015A) 7.56 TeV (6505A) no warm bore tube forced flow cooling liquid helium bath cooling no warm bore liquid helium bath cooling no warm bore 19-April-2002 (revised 8-Jan-2003) (revised 19-Dec-03) (revised 9-Jan-04) J. F. Muratore Brookhaven National Lab D2L101 QUENCH SUMMARY Magcool Bay C ________________________________________________________________________________

478

Surveillance Guides - QAS 2.1 Nonconforming Conditions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NONCONFORMING CONDITIONS NONCONFORMING CONDITIONS 1.0 Objective The objective of this surveillance is to examine the effectiveness of the contractor's implementation of programs to identify, analyze and correct conditions that are adverse to quality. Such conditions may include equipment that may not be able to perform its safety functions, procedures that contain errors, safety analyses with incorrect assumptions, designs that include errors or are incomplete, or materials that are different than those specified. The surveillance provides a basis for examining the effectiveness of existing contractor programs and evaluating whether implementation of the programs complies with applicable DOE requirements. 2.0 References 2.1 DOE 5700.6C, Quality Assurance

479

Categorical Exclusion Determinations: B1.2 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determinations: B1.2 Existing Regulations B1.2: Training exercises and simulations Training exercises and simulations (including, but not limited to, firing-range training, small-scale and short-duration force-on-force exercises, emergency response training, fire fighter and rescue training, and decontamination and spill cleanup training) conducted under appropriately controlled conditions and in accordance with applicable requirements. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD August 16, 2013

480

Hot Cell Examination of Hatch 1 and 2 Fuel Rods  

Science Conference Proceedings (OSTI)

Two sound GE13 fuel rods were examined in the GE Hitachi Vallecitos Nuclear Center hot cells. The rodsone each from the Hatch 1 and Hatch 2 reactorswere retrieved to characterize their performance over three cycles relative to the presence of thick tenacious crud and a common cladding material lot that experienced corrosion-related failures in Browns Ferry 2, which is documented in EPRI report 1013421. The rods were retrieved along with five other rods associated with the Hatch 1 Cycle 21 duty-related fa...

2009-06-30T23:59:59.000Z