National Library of Energy BETA

Sample records for adapting onsite electrical

  1. Adapting On-Site Electrical Generation Platforms for Producer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adapting On-Site Electrical Generation Platforms for Producer Gas - Fact Sheet, April 2014 The University of Minnesota, Morris, in collaboration with the University of Minnesota ...

  2. Adapting On-site Electrical Generation Platforms for Producer Gas

    Office of Energy Efficiency and Renewable Energy (EERE)

    Internal combustion reciprocating engine generators (gensets) are regularly deployed at distribution centers, small municipal utilities, and public institutions to provide on-site electricity...

  3. Adapting On-Site Electrical Generation Platforms for Producer Gas - Fact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sheet, April 2014 | Department of Energy Adapting On-Site Electrical Generation Platforms for Producer Gas - Fact Sheet, April 2014 Adapting On-Site Electrical Generation Platforms for Producer Gas - Fact Sheet, April 2014 The University of Minnesota, Morris, in collaboration with the University of Minnesota Center for Diesel Research, Cummins Power Generation Inc., ALL Power Labs, and Hammel, Green & Abrahamson (HGA), integrated a biomass gasifier and a reciprocating engine generator

  4. Table 11.4 Electricity: Components of Onsite Generation, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    4 Electricity: Components of Onsite Generation, 2002;" " Level: National and Regional Data; " " Row: Values of Shipments and Employment Sizes;" " Column: Onsite-Generation Components;" " Unit: Million Kilowatthours." " ",,,"Renewable Energy" ,,,"(excluding Wood",,"RSE" "Economic","Total Onsite",,"and",,"Row"

  5. Table 11.4 Electricity: Components of Onsite Generation, 2010;

    U.S. Energy Information Administration (EIA) Indexed Site

    4 Electricity: Components of Onsite Generation, 2010; Level: National and Regional Data; Row: Values of Shipments and Employment Sizes; Column: Onsite-Generation Components; Unit: Million Kilowatthours. Renewable Energy (excluding Wood Economic Total Onsite and Characteristic(a) Generation Cogeneration(b) Other Biomass)(c) Other(d) Total United States Value of Shipments and Receipts (million dollars) Under 20 1,406 632 Q 746 20-49 2,466 1,907 535 25 50-99 2,593 2,513 45 36 100-249 11,375 10,771

  6. Table E13.2. Electricity: Components of Onsite Generation, 1998

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Electricity: Components of Onsite Generation, 1998;" " Level: National and Regional Data; " " Row: Values of Shipments and Employment Sizes;" " Column: Onsite-Generation Components;" " Unit: Million Kilowatthours." " ",,,"Renewable Energy" ,,,"(excluding Wood",,"RSE" "Economic","Total Onsite",,"and",,"Row"

  7. Table A20. Components of Onsite Electricity Generation by Census Region and

    U.S. Energy Information Administration (EIA) Indexed Site

    Components of Onsite Electricity Generation by Census Region and" " Economic Characteristics of the Establishment, 1991" " (Estimates in Million Kilowatthours)" ,,,,,"RSE" " "," "," "," "," ","Row" "Economic Characteristics(a)","Total","Cogeneration","Renewables","Other(b)","Factors" ,"Total United States" "RSE Column

  8. Table A28. Components of Onsite Electricity Generation by Census Region, Cens

    U.S. Energy Information Administration (EIA) Indexed Site

    Components of Onsite Electricity Generation by Census Region, Census Division, and" " Economic Characteristics of the Establishment, 1994" " (Estimates in Million Kilowatthours)" ,,,"Renewables" ,,,"(excluding Wood",,"RSE" " "," "," ","and"," ","Row" "Economic Characteristics(a)","Total","Cogeneration(b)","Other

  9. Electricity Market Complex Adaptive System

    Energy Science and Technology Software Center (OSTI)

    2004-10-14

    EMCAS is a model developed for the simulation and analysis of electricity markets. As power markets are relatively new and still continue to evolve, there is a growing need for advanced modeling approaches that simulate the behavior of electricity markets over time and how market participants may act and react to the changing economic, financial, and regulatory environments in which they operate. A new and rather promising approach applied in the EMCAS software is tomore » model the electricity market as a complex adaptive system using an agent-based modeling and simulation scheme. With its unique combination of various novel approaches, the Agent Based Modeling System (ABMS) provides the ability to capture and investigate the complex interactions between the physical infrastructures (generation, transmission, and distribution) and the economic behavior of market participants that are a trademark of the newly emerging markets.« less

  10. Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchasing Green Power Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation DOE/EE-0307 This guide can be downloaded from: www1.eere.energy.gov/femp/technologies/renewable_purchasingpower.html www.epa.gov/greenpower/ www.wri.org/publications www.resource-solutions.org/publications.php Office of Air (6202J) EPA430-K-04-015 www.epa.gov/greenpower March 2010 ISBN: 1-56973-577-8 Guide to Purchasing Green Power i Table of Contents Summary

  11. "Table A17. Components of Onsite Electricity Generation by Census Region,"

    U.S. Energy Information Administration (EIA) Indexed Site

    7. Components of Onsite Electricity Generation by Census Region," " Industry Group, and Selected Industries, 1991" " (Estimates in Million Kilowatthours)" " "," "," "," "," "," "," "," " " "," "," "," "," "," ","RSE" "SIC"," "," "," "," "," ","Row"

  12. "Table A27. Components of Onsite Electricity Generation by Census Region,"

    U.S. Energy Information Administration (EIA) Indexed Site

    Components of Onsite Electricity Generation by Census Region," " Census Division, Industry Group, and Selected Industries, 1994" " (Estimates in Million Kilowatthours)" ," "," "," "," " " "," "," "," ",," ","RSE" "SIC"," "," "," ",," ","Row" "Code(a)","Industry Group and

  13. NFPA, 1996 revisions to National Electrical Code, NFPA 110, and NFPA 99 that affect on-site power generation

    SciTech Connect (OSTI)

    Johnson, G.S.; Bell, J.; Whittall, H.

    1995-12-31

    The three most important NFPA standards for the on-site power industry are: NFPA 70-The National Electrical Code, NFPA 110 Emergency and Standby Power Systems and NFPA 99-Health Care Facilities. This paper will cover the important revisions affecting on-site power generation systems for the 1996 editions. Each of the three authors is a member of one or more of the technical committees that have responsibility for writing these standards.

  14. Distributed Energy Resources On-Site Optimization for Commercial Buildings with Electric and Thermal Storage Technologies

    SciTech Connect (OSTI)

    Lacommare, Kristina S H; Stadler, Michael; Aki, Hirohisa; Firestone, Ryan; Lai, Judy; Marnay, Chris; Siddiqui, Afzal

    2008-05-15

    The addition of storage technologies such as flow batteries, conventional batteries, and heat storage can improve the economic as well as environmental attractiveness of on-site generation (e.g., PV, fuel cells, reciprocating engines or microturbines operating with or without CHP) and contribute to enhanced demand response. In order to examine the impact of storage technologies on demand response and carbon emissions, a microgrid's distributed energy resources (DER) adoption problem is formulated as a mixed-integer linear program that has the minimization of annual energy costs as its objective function. By implementing this approach in the General Algebraic Modeling System (GAMS), the problem is solved for a given test year at representative customer sites, such as schools and nursing homes, to obtain not only the level of technology investment, but also the optimal hourly operating schedules. This paper focuses on analysis of storage technologies in DER optimization on a building level, with example applications for commercial buildings. Preliminary analysis indicates that storage technologies respond effectively to time-varying electricity prices, i.e., by charging batteries during periods of low electricity prices and discharging them during peak hours. The results also indicate that storage technologies significantly alter the residual load profile, which can contribute to lower carbon emissions depending on the test site, its load profile, and its adopted DER technologies.

  15. Electricity Market Complex Adaptive System | Open Energy Information

    Open Energy Info (EERE)

    Complex Adaptive System Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Electricity Market Complex Adaptive System AgencyCompany Organization: Argonne National...

  16. Optimized Energy Management for Large Organizations Utilizing an On-Site PHEV fleet, Storage Devices and Renewable Electricity Generation

    SciTech Connect (OSTI)

    Dashora, Yogesh; Barnes, J. Wesley; Pillai, Rekha S; Combs, Todd E; Hilliard, Michael R

    2012-01-01

    Abstract This paper focuses on the daily electricity management problem for organizations with a large number of employees working within a relatively small geographic location. The organization manages its electric grid including limited on-site energy generation facilities, energy storage facilities, and plug-in hybrid electric vehicle (PHEV) charging stations installed in the parking lots. A mixed integer linear program (MILP) is modeled and implemented to assist the organization in determining the temporal allocation of available resources that will minimize energy costs. We consider two cost compensation strategies for PHEV owners: (1) cost equivalent battery replacement reimbursement for utilizing vehicle to grid (V2G) services from PHEVs; (2) gasoline equivalent cost for undercharging of PHEV batteries. Our case study, based on the Oak Ridge National Laboratory (ORNL) campus, produced encouraging results and substantiates the importance of controlled PHEV fleet charging as opposed to uncontrolled charging methods. We further established the importance of realizing V2G capabilities provided by PHEVs in terms of significantly reducing energy costs for the organization.

  17. Guide to purchasing green power. Renewable electricity, renewable energy certificates and on-site renewable generation

    SciTech Connect (OSTI)

    2004-09-30

    The Guide to Purchasing Green Power is intended for organizations that are considering the merits of buying green power as well as those that have decided to buy it and want help doing so. The Guide was written for a broad audience, including businesses, government agencies, universities, and all organizations wanting to diversify their energy supply and to reduce the environmental impact of their electricity use.The Guide provides an overview of green power markets and describes the necessary steps to buying green power. This section summarizes the Guide to help readers find the information they need.

  18. Adaptive powertrain control for plugin hybrid electric vehicles

    DOE Patents [OSTI]

    Kedar-Dongarkar, Gurunath; Weslati, Feisel

    2013-10-15

    A powertrain control system for a plugin hybrid electric vehicle. The system comprises an adaptive charge sustaining controller; at least one internal data source connected to the adaptive charge sustaining controller; and a memory connected to the adaptive charge sustaining controller for storing data generated by the at least one internal data source. The adaptive charge sustaining controller is operable to select an operating mode of the vehicle's powertrain along a given route based on programming generated from data stored in the memory associated with that route. Further described is a method of adaptively controlling operation of a plugin hybrid electric vehicle powertrain comprising identifying a route being traveled, activating stored adaptive charge sustaining mode programming for the identified route and controlling operation of the powertrain along the identified route by selecting from a plurality of operational modes based on the stored adaptive charge sustaining mode programming.

  19. NETL: Onsite Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    On-site Research onsite intro video ORD's Director Presents an Overview of NETL's Onsite Research A National Energy R&D Resource since 1910 As the lead laboratory for DOE's Office of Fossil Energy, NETL relies on a strong onsite research program conducted by federal scientists and engineers working in partnership with academia, other research institutions, and the private sector. NETL's Office of Research and Development (ORD) provides the science and engineering basis for next generation

  20. Interconnection Agreements for Onsite Generation

    Broader source: Energy.gov [DOE]

    Presentation covers Interconnection Agreements for Onsite Generation and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  1. Voluntary Protection Program Onsite Review, Bechtel National...

    Office of Environmental Management (EM)

    Review, Waste Treatment Project - May 2006 Voluntary Protection Program Onsite Review, Waste Treatment Plant Construction Project - June 2010 Voluntary Protection Program Onsite...

  2. Static Sankey Diagram of Onsite Generation in U.S. Manufacturing Sector |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Onsite Generation in U.S. Manufacturing Sector Static Sankey Diagram of Onsite Generation in U.S. Manufacturing Sector The Onsite Generation Static Sankey diagram shows how steam and electricity are generated by U.S. manufacturing plants. Click on the Full Sector, Process Energy, and Nonprocess Energy thumbnails below the diagram to see further detail on energy flows in manufacturing. Also, see the Dynamic Manufacturing Energy Sankey Tool to pan, zoom, and customize the

  3. Preparing the Way for New Policy Regarding Adaptation of US Electricity Infrastructure to Climate Change

    SciTech Connect (OSTI)

    Allen, Melissa R

    2013-10-01

    The following pages represent the status of policy regarding adaptation of the electric grid to climate change and proposed directions for new policy development. While strides are being made to understand the current climate and to predict hazards it may present to human systems, both the science and the policy remain at present in an analytical state. The policy proposed in this document involves first continued computational modeling of outcomes which will produce a portfolio of options to be considered in light of specific region-related risks. It is proposed that the modeling continue not only until reasonable policy at various levels of jurisdiction can be derived from its outcome but also on a continuing basis so that as improvements in the understanding of the state and trajectory of climate science along with advancements in technology arise, they can be incorporated into an appropriate and evolving policy.

  4. RADIOLOGICAL EFFLUENT AND ONSITE AREA MONITORING REPORT FOR THE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    l 0327-33 a a RADIOLOGICAL EFFLUENT AND ONSITE AREA MONITORING REPORT FOR THE 0 NEVADA TEST SITE (JANUARY 1986 THROUGH DECEMBER 1986) BANEL A. GONZALEZ HEALTH PHY%ICIST SePTEMl3ER 1987 WORK PERFORMED UNDER CONTRACT NO. DE-ACXM-84-84NV10327 REYNOLDS ELECTRICAL & ENGINEERING CO., INC. POST OFFICE BOX 14400 LAS VEGAS, NV 89114 DOE/NV/10327-33 RADIOLOGICAL EFFLUENT AND ONSITE AREA MONITORING REPORT FOR THE NEVADA TEST SITE (JANUARY 1986 THROUGH DECEMBER 1986) Daniel A. Gonzalez Health Physicist

  5. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Get Access to Work Onsite Print Monday, 31 August 2009 09:48 The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to

  6. Voluntary Protection Program Onsite Review, Parsons Corporation...

    Office of Environmental Management (EM)

    Corporation Salt Waste Processing Facility Construction Project - October 2015 Voluntary Protection Program Onsite Review, Parsons Corporation Salt Waste Processing Facility...

  7. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Print The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can take 4-6 months to

  8. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Print The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can take 4-6 months to

  9. Assessing the Benefits of On-Site Combined Heat and Power During the August

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14, 2003, Blackout, June 2004 | Department of Energy Assessing the Benefits of On-Site Combined Heat and Power During the August 14, 2003, Blackout, June 2004 Assessing the Benefits of On-Site Combined Heat and Power During the August 14, 2003, Blackout, June 2004 On August 14, 2003, large portions of the Midwest and Northeast United States and Ontario, Canada, experienced an electric power outage. This study focused on identifying facilities located in the August 2003 blackout area (United

  10. Voluntary Protection Program Onsite Review, Washington Closure...

    Office of Environmental Management (EM)

    Washington Closure Hanford VPP Report - March 2009 Voluntary Protection Program Onsite Review, Washington Closure Hanford VPP Report - March 2009 March 2009 Evaluation to determine...

  11. Voluntary Protection Program Onsite Review, Wackenhut Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review, Wackenhut Services, Incorporated - Nevada - May 2008 Voluntary Protection Program Onsite Review, Wackenhut Services, Incorporated - Nevada - May 2008 May 2008 Evaluation to ...

  12. Voluntary Protection Program Onsite Review, Bechtel National...

    Office of Environmental Management (EM)

    Bechtel National Inc., Waste Treatment Plant Construction Site - November 2013 Voluntary Protection Program Onsite Review, Bechtel National Inc., Waste Treatment Plant Construction...

  13. Voluntary Protection Program Onsite Review, Facility Engineering...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility Engineering Services KCP, LLC - September 2012 Voluntary Protection Program Onsite Review, Facility Engineering Services KCP, LLC - September 2012 September 2012 ...

  14. Voluntary Protection Program Onsite Review, Transuranic Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transuranic Waste Processing Center - September 2012 Voluntary Protection Program Onsite Review, Transuranic Waste Processing Center - September 2012 September 2012 Evaluation to...

  15. Voluntary Protection Program Onsite Review, Volpentest HAMMER...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volpentest HAMMER Training Center January 2011 Voluntary Protection Program Onsite Review, Volpentest HAMMER Training Center January 2011 January 2011 Evaluation to determine ...

  16. Voluntary Protection Program Onsite Review, Portsmouth Facility...

    Office of Environmental Management (EM)

    Portsmouth Facility Support Services - March 2013 Voluntary Protection Program Onsite Review, Portsmouth Facility Support Services - March 2013 March 2013 Evaluation to determine...

  17. Voluntary Protection Program Onsite Review, Washington River...

    Energy Savers [EERE]

    Washington River Protection Solutions, LLC, Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 February...

  18. Voluntary Protection Program Onsite Review, Advanced Technologies...

    Office of Environmental Management (EM)

    Advanced Technologies and Laboratories, Inc., Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Advanced Technologies and Laboratories, Inc., Hanford - Feb 2014...

  19. Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certificates, and On-Site Renewable Generation | Department of Energy Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation Document describes renewable electricity, renewable energy certificates, and on-site renewable generation, which agencies and organizations can consider to diversify their energy supply and

  20. Guide to Purchasing Green Power: Renewable Electricity, Renewable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation Guide to Purchasing Green Power: Renewable Electricity, ...

  1. Assessment of On-Site Power Opportunities in the Industrial Sector

    SciTech Connect (OSTI)

    Bryson, T.

    2001-10-08

    The purpose of this report is to identify the potential for on-site power generation in the U.S. industrial sector with emphasis on nine industrial groups called the ''Industries of the Future'' (IOFs) by the U.S. Department of Energy (DOE). Through its Office of Industrial Technologies (OIT), the DOE has teamed with the IOFs to develop collaborative strategies for improving productivity, global competitiveness, energy usage and environmental performance. Total purchases for electricity and steam for the IOFs are in excess of $27 billion annually. Energy-related costs are very significant for these industries. The nine industrial groups are (1) Agriculture (SIC 1); (2) Forest products; (3) Lumber and wood products (SIC 24); (4) Paper and allied products (SIC 26); (5) Mining (SIC 11, 12, 14); (6) Glass (SIC 32); (7) Petroleum (SIC 29); (8) Chemicals (SIC 28); and (9) Metals (SIC 33): Steel, Aluminum, and Metal casting. Although not currently part of the IOF program, the food industry is included in this report because of its close relationship to the agricultural industry and its success with on-site power generation. On-site generation provides an alternative means to reduce energy costs, comply with environmental regulations, and ensure a reliable power supply. On-site generation can ease congestion in the local utility's electric grid. Electric market restructuring is exacerbating the price premium for peak electricity use and for reliability, creating considerable market interest in on-site generation.

  2. Voluntary Protection Program Onsite, Liquid Waste Contract Savannah...

    Office of Environmental Management (EM)

    Onsite, Liquid Waste Contract Savannah River Site - February 2011 Voluntary Protection Program Onsite, Liquid Waste Contract Savannah River Site - February 2011 February 2011 ...

  3. Green Power Partner On-site Renewable Commitments | Department...

    Energy Savers [EERE]

    EPA Green Power Partnership's On-site Renewables Challenge, EPA is highlighting the tangible commitments made by partners to increase the deployment of on-site renewable energy ...

  4. Oregon Application for Onsite Sewage Treatment System | Open...

    Open Energy Info (EERE)

    Application for Onsite Sewage Treatment System Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Oregon Application for Onsite Sewage Treatment System...

  5. Voluntary Protection Program Onsite Review, Safeguards and Security...

    Office of Environmental Management (EM)

    Safeguards and Security - August 2012 Voluntary Protection Program Onsite Review, FLUOR HANFORD SAS - February 2008 Voluntary Protection Program Onsite Review, Hanford...

  6. Energy Savings Performance Contracting 14-hour Agency Onsite...

    Energy Savers [EERE]

    Energy Savings Performance Contracting 14-hour Agency Onsite Workshop Energy Savings Performance Contracting 14-hour Agency Onsite Workshop January 20, 2016 8:30AM PST to January...

  7. Oregon Onsite Wastewater Management Program Forms by County Webpage...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Oregon Onsite Wastewater Management Program Forms by County Webpage Abstract Provides access to county level onsite...

  8. Oregon Onsite Wastewater Management Program Webpage | Open Energy...

    Open Energy Info (EERE)

    Onsite Wastewater Management Program Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Onsite Wastewater Management Program Webpage...

  9. Federal On-Site Renewable Power Purchase Agreements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal On-Site Renewable Power Purchase Agreements On-site renewable power ... to fund renewable energy projects with minimal ... Distributed Generation Projects: Webinar ...

  10. CTBT on-site inspections

    SciTech Connect (OSTI)

    Zucca, J. J.

    2014-05-09

    On-site inspection (OSI) is a critical part of the verification regime for the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The OSI verification regime provides for international inspectors to make a suite of measurements and observations on site at the location of an event of interest. The other critical component of the verification regime is the International Monitoring System (IMS), which is a globally distributed network of monitoring stations. The IMS along with technical monitoring data from CTBT member countries, as appropriate, will be used to trigger an OSI. After the decision is made to carry out an OSI, it is important for the inspectors to deploy to the field site rapidly to be able to detect short-lived phenomena such as the aftershocks that may be observable after an underground nuclear explosion. The inspectors will be on site from weeks to months and will be working with many tens of tons of equipment. Parts of the OSI regime will be tested in a field exercise in the country of Jordan late in 2014. The build-up of the OSI regime has been proceeding steadily since the CTBT was signed in 1996 and is on track to becoming a deterrent to someone considering conducting a nuclear explosion in violation of the Treaty.

  11. Onsite Recovered Energy LP | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name: Onsite Recovered Energy LP Address: Centurion Region: South Africa Sector: Marine and Hydrokinetic Year Founded: 2009 Phone Number: +27 (0)83 526-3767...

  12. Making evolution work for us: Structural adaptation in the electric industry

    SciTech Connect (OSTI)

    Howe, J.

    1994-09-01

    Adoption of a thoughtful model of reform with the unbundling of generation as its keystone could make the evolutionary process work for the industry and its stakeholders alike. Integration of transition cost recovery into this approach would defuse utilities` concerns that exposure to competition could lead to financial meltdown. Evolution, biologists now theorize, takes place not in glacial, steady progression but in volatile spasms. Surely this principle of dynamis and stasis is illustrated by the sudden wave of reform activity underway in electricity markets - a startling departure after decades in which the utility industry was the very symbol of stability in American business. The change agent has been the onset of effective competition in bulk power generation, beginning with the thin wedge of the Public Utility Regulatory Policies Act. As competition in the power supply area grew, spurred by low natural gas prices and advances in the cost effectiveness of smaller generating units, Congress enacted the Energy Policy Act of 1992, embracing competition in bulk power markets as the cornerstone of federal electricity policy. Passage of EPAct alone will not, in and of itself, restructure bulk power markets, of course. Rather, it will result in the opening of transmission systems over time and the establishment of truly competitive power markets, with private initiative and actions by federal and state regulators. Even more recently, before the industry could catch its breath and accommodate to the substantial changes set in motion by EPAct, the ripening of retail wheeling proposals in California and Michigan has spurred a further quantum leap in the nature of the debate over the industry`s future.

  13. Optimal selection of on-site generation with combined heat andpower applications

    SciTech Connect (OSTI)

    Siddiqui, Afzal S.; Marnay, Chris; Bailey, Owen; HamachiLaCommare, Kristina

    2004-11-30

    While demand for electricity continues to grow, expansion of the traditional electricity supply system, or macrogrid, is constrained and is unlikely to keep pace with the growing thirst western economies have for electricity. Furthermore, no compelling case has been made that perpetual improvement in the overall power quality and reliability (PQR)delivered is technically possible or economically desirable. An alternative path to providing high PQR for sensitive loads would generate close to them in microgrids, such as the Consortium for Electricity Reliability Technology Solutions (CERTS) Microgrid. Distributed generation would alleviate the pressure for endless improvement in macrogrid PQR and might allow the establishment of a sounder economically based level of universal grid service. Energy conversion from available fuels to electricity close to loads can also provide combined heat and power (CHP) opportunities that can significantly improve the economics of small-scale on-site power generation, especially in hot climates when the waste heat serves absorption cycle cooling equipment that displaces expensive on-peak electricity. An optimization model, the Distributed Energy Resources Customer Adoption Model (DER-CAM), developed at Berkeley Lab identifies the energy bill minimizing combination of on-site generation and heat recovery equipment for sites, given their electricity and heat requirements, the tariffs they face, and a menu of available equipment. DER-CAM is used to conduct a systemic energy analysis of a southern California naval base building and demonstrates atypical current economic on-site power opportunity. Results achieve cost reductions of about 15 percent with DER, depending on the tariff.Furthermore, almost all of the energy is provided on-site, indicating that modest cost savings can be achieved when the microgrid is free to select distributed generation and heat recovery equipment in order to minimize its over all costs.

  14. Potential Federal On-Site Solar Aggregation in Washington, D...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potential Federal On-Site Solar Aggregation in Washington, D.C., and Maryland Potential Federal On-Site Solar Aggregation in Washington, D.C., and Maryland Presentation describes...

  15. Specialized control panels designed for on-site compression of...

    Office of Scientific and Technical Information (OSTI)

    Specialized control panels designed for on-site compression of natural gas Citation Details In-Document Search Title: Specialized control panels designed for on-site compression of ...

  16. Green Power Partnership On-site Renewables Challenge | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    use of on-site green power generated by partners by the end of the decade. The partnership tracks partners' annual combined on-site renewable energy use and is updated quarterly. ...

  17. Voluntary Protection Program On-site Evaluations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Voluntary Protection Program On-site Evaluations Voluntary Protection Program On-site Evaluations April 28, 2016 Voluntary Protection Program On-site Review, Pacific Northwest National Laboratory/Battelle Memorial Institute - November 2015 Recertification of PNNL as a Star Participant in the Department of Energy Voluntary Protection Program. December 14, 2015 Voluntary Protection Program Onsite Review, Parsons Corporation Salt Waste Processing Facility Construction Project - October 2015 Parsons

  18. EOI: Onsite Legacy Material Removal | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Onsite Legacy ... EOI: Onsite Legacy Material Removal Consolidated Nuclear Security, LLC (hereafter known as "CNS", for additional company information, see website (www.y12.doe.gov)), acting under its Prime Contract No. DE-NA0001942 with the United States Department of Energy (DOE), is soliciting an Expression of Interest (EOI) for onsite legacy material removal, at the Y-12 National Security Complex in Oak Ridge, Tennessee. CNS has the need for a supplier to perform onsite materials

  19. Voluntary Protection Program Onsite Review, Waste Treatment Plant...

    Office of Environmental Management (EM)

    More Documents & Publications Voluntary Protection Program Onsite Review, Intermech Inc., Waste Treatment Plant Construction Site - November 2013 Voluntary Protection Program...

  20. Rate Structures for Customers With Onsite Generation: Practice and Innovation

    SciTech Connect (OSTI)

    Johnston, L.; Takahashi, K.; Weston, F.; Murray, C.

    2005-12-01

    Recognizing that innovation and good public policy do not always proclaim themselves, Synapse Energy Economics and the Regulatory Assistance Project, under a contract with the California Energy Commission (CEC) and the National Renewable Energy Laboratory (NREL), undertook a survey of state policies on rates for partial-requirements customers with onsite distributed generation. The survey investigated a dozen or so states. These varied in geography and the structures of their electric industries. By reviewing regulatory proceedings, tariffs, publications, and interviews, the researchers identified a number of approaches to standby and associated rates--many promising but some that are perhaps not--that deserve policymakers' attention if they are to promote the deployment of cost-effective DG in their states.

  1. Voluntary Protection Program Onsite Review, Wackenhut Services,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Incorporated - Nevada - May 2008 | Department of Energy Review, Wackenhut Services, Incorporated - Nevada - May 2008 Voluntary Protection Program Onsite Review, Wackenhut Services, Incorporated - Nevada - May 2008 May 2008 Evaluation to determine whether Wackenhut Services, Incorporated - Nevada is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during May 5-8, 2008 to determine whether WSI-NV is continuing to perform at a level deserving

  2. PARTNERING WITH ON-SITE RESEARCH

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Partnering With On-Site Research Collaboration is Key to Tackling Grand Energy Challenges The challenges we face today are the most critical in decades-from the impact of energy use on global ecosystems to the difficulties of efficiently harnessing our natural resources. Science and engineering have provided us with solutions to grand challenges in the past, and we are confident that they will help us build the bridge to a clean, sustainable energy future. However, complex problems are often

  3. Table 11.3 Electricity: Components of Onsite Generation, 2010...

    U.S. Energy Information Administration (EIA) Indexed Site

    Total United States 311 Food 5,666 5,414 81 171 3112 Grain and Oilseed ... * * 0 * 324 Petroleum and Coal Products 18,989 18,095 1 893 324110 Petroleum Refineries 17,646 17,404 0 ...

  4. Table 11.3 Electricity: Components of Onsite Generation, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    ,,"Total United States" ,"RSE Column ... 324,"Petroleum and Coal Products",17503,16868,0,635,1.3 324110," Petroleum Refineries",16273,15709,0...

  5. A business case for on-site generation: The BD biosciences pharmingen project

    SciTech Connect (OSTI)

    Firestone, Ryan; Creighton, Charles; Bailey, Owen; Marnay, Chris; Stadler, Michael

    2003-09-01

    Deregulation is haltingly changing the United States electricity markets. The resulting uncertainty and/or rising energy costs can be hedged by generating electricity on-site and other benefits, such as use of otherwise wasted heat, can be captured. The Public Utility Regulatory Policy Act (PURPA) of 1978 first invited relatively small-scale generators ({ge} 1 MW) into the electricity market. The advent of efficient and reliable small scale and renewable equipment has spurred an industry that has, in recent years, made even smaller (business scale) electricity generation an economically viable option for some consumers. On-site energy capture and/or conversion, known as distributed energy resources (DER), offers consumers many benefits, such as economic savings and price predictability, improved reliability, control over power quality, and emissions reductions. Despite these benefits, DER adoption can be a daunting move to a customer accustomed to simply paying a monthly utility bill. San Diego is in many ways an attractive location for DER development: It has high electricity prices typical of California and a moderate climate i.e. energy loads are consistent throughout the year. Additionally, the price shock to San Diego Gas and Electric (SDG&E) customers during the summer of 2000 has interested many in alternatives to electricity price vulnerability. This report examines the business case for DER at the San Diego biotechnology supply company, BD Biosciences Pharmingen, which considered DER for a building with 200-300 kW base-load, much of which accommodates the refrigerators required to maintain chemicals. Because of the Mediterranean climate of the San Diego area and the high rate of air changes required due to on-site use of chemicals, modest space heating is required throughout the year. Employees work in the building during normal weekday business hours, and daily peak loads are typically about 500 kW.

  6. ELECTRIC

    Office of Legacy Management (LM)

    ELECTRIC cdrtrokArJclaeT 3 I+ &i, y$ \I &OF I*- j< t j,fci..- ir )(yiT !E-li, ( \-,v? Cl -p/4.4 RESEARCH LABORATORIES EAST PITTSBURGH, PA. 8ay 22, 1947 Mr. J. Carrel Vrilson General ?!!mager Atomic Qxzgy Commission 1901 Constitution Avenue Kashington, D. C. Dear Sir: In the course of OUT nuclenr research we are planning to study the enc:ri;y threshold anti cross section for fission. For thib program we require a s<>piAroted sample of metallic Uranium 258 of high purity. A

  7. Voluntary Protection Program Onsite Review, Los Alamos Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Alamos Operations - November 2011 Voluntary Protection Program Onsite Review, Los Alamos Operations - November 2011 November 2011 Evaluation to determine whether Los Alamos ...

  8. Voluntary Protection Program Onsite Review, Tank Farm Operations...

    Office of Environmental Management (EM)

    Tank Farm Operations Contract - November 2010 Voluntary Protection Program Onsite Review, Tank Farm Operations Contract - November 2010 November 2010 Evaluation to determine ...

  9. Voluntary Protection Program Onsite Review, Hanford Mission Support...

    Office of Environmental Management (EM)

    Hanford Mission Support Contract - October 2011 Voluntary Protection Program Onsite Review, Hanford Mission Support Contract - October 2011 October 2011 Evaluation to determine ...

  10. Voluntary Protection Program Onsite Review, WSI-Nevada - Nevada...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WSI-Nevada - Nevada National Security Site - February 2012 Voluntary Protection Program Onsite Review, WSI-Nevada - Nevada National Security Site - February 2012 February 2012 ...

  11. Voluntary Protection Program Onsite Review, Nevada National Security...

    Broader source: Energy.gov (indexed) [DOE]

    February 2012 Evaluation to determine whether the Nevada National Security Sites is ... Voluntary Protection Program Onsite Review, Nevada National Security Sites - February 2012 ...

  12. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Science and Education - April 2008 Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities Oak Ridge Institute for Science and Education - April 2008 ...

  13. Voluntary Protection Program Onsite Review, Fluor Federal Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fluor Federal Services, Inc., Richland, Washington - June 2011 Voluntary Protection Program Onsite Review, Fluor Federal Services, Inc., Richland, Washington - June 2011 June 2011 ...

  14. Voluntary Protection Program Onsite Review, CH2M HILL Plateau...

    Broader source: Energy.gov (indexed) [DOE]

    Programs Participants' Association (VPPPA) Presentation: Conducting your Annual VPP Self Assessment Voluntary Protection Program Onsite Review, CH2M HILL Analytical Technical...

  15. Voluntary Protection Program Onsite Review, Intermech Inc., Waste...

    Office of Environmental Management (EM)

    Intermech Inc., Waste Treatment Plant Construction Site - November 2013 Voluntary Protection Program Onsite Review, Intermech Inc., Waste Treatment Plant Construction Site -...

  16. Oregon Construction/Installation Permit for Onsite Wastewater...

    Open Energy Info (EERE)

    ConstructionInstallation Permit for Onsite Wastewater Treatment System Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Construction...

  17. Voluntary Protection Program Onsite Review, Parsons Corp., Salt...

    Office of Environmental Management (EM)

    Corp., Salt Waste Processing Facility Construction Project - May 2014 Voluntary Protection Program Onsite Review, Parsons Corp., Salt Waste Processing Facility Construction Project...

  18. Voluntary Protection Program Onsite Review, Idaho Treatment Group...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Treatment Group, Llc, Advanced Mixed Waste Treatment Project - June 2014 Voluntary Protection Program Onsite Review, Idaho Treatment Group, Llc, Advanced Mixed Waste ...

  19. On-site Analysis of Explosives in Various Matrices (Conference...

    Office of Scientific and Technical Information (OSTI)

    States) Atmospheric System Research Bartlesville ... Atmospheric Radiation Measurement (ARM) Program (United ... SciTech Connect Conference: On-site Analysis of Explosives ...

  20. Voluntary Protection Program Onsite Review, Waste Treatment Project...

    Office of Environmental Management (EM)

    Treatment Project - May 2006 Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 May 2006 Evaluation of Intermech, Inc. activities at the Hanford Waste...

  1. Voluntary Protection Program Onsite Review, Salt Waste Processing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Team conducted its review during February 5 - 14, 2013 to determine whether Parsons ... Voluntary Protection Program Onsite Review, Parsons Corporation Salt Waste Processing ...

  2. Voluntary Protection Program Onsite Review, Swift and Staley...

    Office of Environmental Management (EM)

    Swift and Staley Team, Infrastructure Support Contract, Paducah Gaseous Diffusion Plant - December 2014 Voluntary Protection Program Onsite Review, Swift and Staley Team,...

  3. Voluntary Protection Program Onsite Review, Savannah River Remediation...

    Office of Environmental Management (EM)

    River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste ...

  4. Oregon Rulemaking Announcement for Onsite Septic System Program...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Oregon Rulemaking Announcement for Onsite Septic System ProgramPermittingRegulatory...

  5. Voluntary Protection Program Onsite Review, Burns & McDonnell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Burns & McDonnell - Facility Engineering Services, LLC - September 2015 Voluntary Protection Program Onsite Review, Burns & McDonnell - Facility Engineering Services, LLC - ...

  6. Oregon Land Use Compatibility Statement for Onsite Wastewater...

    Open Energy Info (EERE)

    Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Oregon Land Use Compatibility Statement for Onsite Wastewater Treatment System Permits Abstract...

  7. Voluntary Protection Program Onsite Review, Mission Support Alliance...

    Office of Environmental Management (EM)

    Llc, Volpentest Hazardous Materials Management and Emergency Response (Hammer), Federal Training Center - September 2014 Voluntary Protection Program Onsite Review, Mission Support...

  8. Federal On-Site Renewable Power Purchasing Issues

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers on-site renewable power purchasing issues for federal facilities.

  9. Voluntary Protection Program Onsite Review, Los Alamos National...

    Office of Environmental Management (EM)

    Security, Llc Los Alamos National Laboratory, Los Alamos, New Mexico - April 2014 Voluntary Protection Program Onsite Review, Los Alamos National Security, Llc Los Alamos National...

  10. Voluntary Protection Program Onsite Review, Safeguards and Security...

    Office of Environmental Management (EM)

    Safeguards and Security - August 2012 Voluntary Protection Program Onsite Review, Safeguards and Security - August 2012 August 2012 Evaluation to determine whether Safeguards and...

  11. Voluntary Protection Program Onsite Review, Waste Isolation Pilot...

    Office of Environmental Management (EM)

    March 2009 Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant - March 2009 March 2009 Evaluation to determine whether the Waste Isolation Pilot Plant is...

  12. Voluntary Protection Program Onsite Review, Los Alamos National...

    Office of Environmental Management (EM)

    Laboratory - November 2011 Voluntary Protection Program Onsite Review, Los Alamos National Laboratory - November 2011 November 2011 Evaluation to determine whether Los Alamos...

  13. Voluntary Protection Program Onsite Review, 222-S Laboratory...

    Office of Environmental Management (EM)

    222-S Laboratory Hanford Site - January 2011 Voluntary Protection Program Onsite Review, 222-S Laboratory Hanford Site - January 2011 January 2008 Evaluation to determine whether...

  14. Voluntary Protection Program Onsite Review, Idaho Cleanup Project...

    Energy Savers [EERE]

    Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is...

  15. Voluntary Protection Program Onsite Review of Wackenhut Services...

    Energy Savers [EERE]

    Review of Wackenhut Services Inc, March 2007 Voluntary Protection Program Onsite Review of Wackenhut Services Inc, March 2007 March 2007 Evaluation to determine whether the...

  16. Voluntary Protection Program Onsite Review, Waste Isolation Pilot...

    Office of Environmental Management (EM)

    January 2013 Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant - January 2013 January 2013 Evaluation to determine whether the Waste Isolation Pilot Plant is...

  17. Voluntary Protection Program Onsite Review, Idaho National Laboratory...

    Energy Savers [EERE]

    Idaho National Laboratory - October 2009 Voluntary Protection Program Onsite Review, Idaho National Laboratory - October 2009 October 2009 Evaluation to determine whether the Idaho...

  18. On-Site Disposal Facility Inspection Report

    Office of Legacy Management (LM)

    8947.1 09/13 On-Site Disposal Facility Inspection Report September 2013 6319-D6242 8947.2 09/13 East Face Cell 1 West Face Cell 1 6319D-6208 6319D-6231 8947.3 09/13 North Face Cell 1 North Drainage (looking west) 6319D-6206 6319D-6205 8947.4 09/13 East Face Cell 2 West Face Cell 2 6319D-6230 6319D-6209 8947.5 09/13 East Face Cell 3 West Face Cell 3 6319D-6229 6319D-6210 8947.6 09/13 East Face Cell 4 West Face Cell 4 6319D-6227 6319D-62111 8947.7 09/13 East Face Cell 5 West Face Cell 5 6319D-6226

  19. 1000kW on-site PAFC power plant development and demonstration

    SciTech Connect (OSTI)

    Satomi, Tomohide; Koike, Shunichi; Ishikawa, Ryou

    1996-12-31

    Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA) and New Energy and Industrial Technology Development Organization (NEDO) have been conducting a joint project on development of a 5000kW urban energy center type PAFC power plant (pressurized) and a 1000kW on-site PAFC power plant (non-pressurized). The objective of the technical development of 1000kW on-site PAFC power plant is to realize a medium size power plant with an overall efficiency of over 70% and an electrical efficiency of over 36%, that could be installed in a large building as a cogeneration system. The components and system integration development work and the plant design were performed in 1991 and 1992. Manufacturing of the plant and installation at the test site were completed in 1994. PAC test was carried out in 1994, and generation test was started in January 1995. Demonstration test is scheduled for 1995 and 1996.

  20. Onsite transportation of radioactive materials at the Savannah River Site

    SciTech Connect (OSTI)

    Watkins, R.

    2015-03-03

    The Savannah River Site (SRS) Transportation Safety Document (TSD) defines the onsite packaging and transportation safety program at SRS and demonstrates its compliance with Department of Energy (DOE) transportation safety requirements, to include DOE Order 460.1C, DOE Order 461.2, Onsite Packaging and Transfer of Materials of National Security Interest, and 10 CFR 830, Nuclear Safety Management (Subpart B).

  1. On-Site Wind Incentive Program

    Broader source: Energy.gov [DOE]

    Eligibility This program is offered as part of the Customer-Sited Tier of the state renewable portfolio standard (RPS) program. Consequently, only customers of electricity distribution utilities...

  2. Onsite Distributed Generation Systems For Laboratories, Laboratories for the 21st Century: Best Practices (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2011-09-01

    This guide provides general information on implementing onsite distributed generation systems in laboratory environments. Specific technology applications, general performance information, and cost data are provided to educate and encourage laboratory energy managers to consider onsite power generation or combined heat and power (CHP) systems for their facilities. After conducting an initial screening, energy managers are encouraged to conduct a detailed feasibility study with actual cost and performance data for technologies that look promising. Onsite distributed generation systems are small, modular, decentralized, grid-connected, or off-grid energy systems. These systems are located at or near the place where the energy is used. These systems are also known as distributed energy or distributed power systems. DG technologies are generally considered those that produce less than 20 megawatts (MW) of power. A number of technologies can be applied as effective onsite DG systems, including: (1) Diesel, natural gas, and dual-fuel reciprocating engines; (2) Combustion turbines and steam turbines; (3) Fuel cells; (4) Biomass heating; (5) Biomass combined heat and power; (6) Photovoltaics; and (7) Wind turbines. These systems can provide a number of potential benefits to an individual laboratory facility or campus, including: (1) High-quality, reliable, and potentially dispatchable power; (2) Low-cost energy and long-term utility cost assurance, especially where electricity and/or fuel costs are high; (3) Significantly reduced greenhouse gas (GHG) emissions. Typical CHP plants reduce onsite GHG by 40 to 60 percent; (4) Peak demand shaving where demand costs are high; (5) CHP where thermal energy can be used in addition to electricity; (6) The ability to meet standby power needs, especially where utility-supplied power is interrupted frequently or for long periods and where standby power is required for safety or emergencies; and (7) Use for standalone or off

  3. On-Site and Bulk Hydrogen Storage | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Delivery » On-Site and Bulk Hydrogen Storage On-Site and Bulk Hydrogen Storage On-site hydrogen storage is used at central hydrogen production facilities, transport terminals, and end-use locations. Storage options today include insulated liquid tanks and gaseous storage tanks. The four types of common high pressure gaseous storage vessels are shown in the table. Type I All-metal cylinder Type II Load-bearing metal liner hoop wrapped with resin-impregnated continuous filament Type III

  4. Idaho On-Site Wastewater Systems Webpage | Open Energy Information

    Open Energy Info (EERE)

    Systems Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho On-Site Wastewater Systems Webpage Abstract This webpage provides an...

  5. Customer adoption of small-scale on-site power generation

    SciTech Connect (OSTI)

    Siddiqui, Afzal S.; Marnay, Chris; Hamachi, Kristina S.; Rubio, F. Javier

    2001-04-01

    The electricity supply system is undergoing major regulatory and technological change with significant implications for the way in which the sector will operate (including its patterns of carbon emissions) and for the policies required to ensure socially and environmentally desirable outcomes. One such change stems from the rapid emergence of viable small-scale (i.e., smaller than 500 kW) generators that are potentially competitive with grid delivered electricity, especially in combined heat and power configurations. Such distributed energy resources (DER) may be grouped together with loads in microgrids. These clusters could operate semi-autonomously from the established power system, or macrogrid, matching power quality and reliability more closely to local end-use requirements. In order to establish a capability for analyzing the effect that microgrids may have on typical commercial customers, such as office buildings, restaurants, shopping malls, and grocery stores, an economic mod el of DER adoption is being developed at Berkeley Lab. This model endeavors to indicate the optimal quantity and type of small on-site generation technologies that customers could employ given their electricity requirements. For various regulatory schemes and general economic conditions, this analysis produces a simple operating schedule for any installed generators. Early results suggest that many commercial customers can benefit economically from on-site generation, even without considering potential combined heat and power and reliability benefits, even though they are unlikely to disconnect from the established power system.

  6. Voluntary Protection Program Onsite Review, Advanced Technologies and

    Office of Environmental Management (EM)

    Laboratories, Inc., Hanford - Feb 2014 | Department of Energy Laboratories, Inc., Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Advanced Technologies and Laboratories, Inc., Hanford - Feb 2014 February 6. 2014 Evaluation to determine whether Advanced Technologies and Laboratories, Inc., Hanford is performing at a level deserving DOE-VPP Star recognition. Voluntary Protection Program Onsite Review, Advanced Technologies and Laboratories, Inc., Hanford - Feb 2014 (66.32 KB)

  7. Voluntary Protection Program Onsite Review, Los Alamos National Security,

    Office of Environmental Management (EM)

    LLC, LANL - June 2013 | Department of Energy Security, LLC, LANL - June 2013 Voluntary Protection Program Onsite Review, Los Alamos National Security, LLC, LANL - June 2013 June, 13, 2013 Evaluation to determine whether Los Alamos National Security, LLC, LANL is performing at a level deserving DOE-VPP Star recognition. Voluntary Protection Program Onsite Review, Los Alamos National Security, LLC, LANL - June 2013 (511.99 KB) More Documents & Publications Voluntary Protection Program

  8. Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant -

    Office of Environmental Management (EM)

    Solutions, LLC, Hanford - Feb 2014 | Department of Energy River Protection Solutions, LLC, Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 February 13, 2014 Evaluation to determine whether Washington River Protection Solutions, LLC, Hanford is performing at a level deserving DOE-VPP Star recognition. Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 (384.08

  9. Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant -

    Office of Environmental Management (EM)

    March 2009 | Department of Energy March 2009 Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant - March 2009 March 2009 Evaluation to determine whether the Waste Isolation Pilot Plant is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during March 3-4, 2009 to determine whether Security Walls, LLC is continuing to perform at a level deserving DOE-VPP Star recognition. Voluntary Protection Program Onsite Review, Waste

  10. Voluntary Protection Program Onsite Review, Waste Treatment Project - May

    Office of Environmental Management (EM)

    2006 | Department of Energy Treatment Project - May 2006 Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 May 2006 Evaluation of Intermech, Inc. activities at the Hanford Waste Treatment Project This report summarizes the team's findings from the evaluation of Intermech, Inc. activities at the Hanford Waste Treatment Project during the week of May 1-2, 2006. Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 (204.33 KB) More Documents

  11. Homeostatic control: the utility/customer marketplace for electric power

    SciTech Connect (OSTI)

    Schweppe, F.C.; Tabors, R.D.; Kirtley, J.L.

    1981-09-01

    A load management system is proposed in which the electric utility customer controls his on-site power demand to coincide with the lowest possible cost of power generation. Called Homeostatic Control, this method is founded on feedback between the customer and the utility and on customer independence. The utility has no control beyond the customer's meter. Computers located at the customer's site are continuously fed data on weather conditions, utility generating costs, and demand requirements for space conditioning, lighting, and appliances. The customer then directs the computer to schedule and control the power allotted for these functions. On-site generation by the customer can be incorporated in the system. It is argued that homeostatic control is technically feasible, that the level of control equipment sophistication can be adapted to the benefits received by the customer, that such a system would encourage the use of customer-site energy storage and energy conservation equipment, and that it represents a realistic method for allowing the customer to decide how he will use electric power during an era of increasing costs for power generation. (LCL)

  12. Reduce completion fluid costs with on-site brine tests

    SciTech Connect (OSTI)

    Thomas, D.C.; Darlington, R.K.; Kinney, W.R.; Lowell, J.L.

    1982-09-01

    A newly developed field kit makes on-site brine completion fluid testing practical. Simple titration procedures are used to analyze brine for calcium, zinc, chloride and bromide with an accuracy and repeatability that compares favorably with expensive laboratory techniques. This article describes the field testing theory and details analytical procedures used.

  13. Onsite Packaging and Transfer of Materials of National Security Interest

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-01

    The order prescribes requirements and responsibilities for identifying and mitigating undue risk of onsite transfers that are non compliant with U.S. Department of Transportation and Nuclear Regulatory Commission regulations. Supersedes DOE O 461.1A and DOE M 461.1-1, Admin Chg 1.

  14. An accurate system for onsite calibration of electronic transformers with digital output

    SciTech Connect (OSTI)

    Zhi Zhang; Li Hongbin

    2012-06-15

    Calibration systems with digital output are used to replace conventional calibration systems because of principle diversity and characteristics of digital output of electronic transformers. But precision and unpredictable stability limit their onsite application even development. So fully considering the factors influencing accuracy of calibration system and employing simple but reliable structure, an all-digital calibration system with digital output is proposed in this paper. In complicated calibration environments, precision and dynamic range are guaranteed by A/D converter with 24-bit resolution, synchronization error limit is nanosecond by using the novelty synchronization method. In addition, an error correction algorithm based on the differential method by using two-order Hanning convolution window has good inhibition of frequency fluctuation and inter-harmonics interference. To verify the effectiveness, error calibration was carried out in the State Grid Electric Power Research Institute of China and results show that the proposed system can reach the precision class up to 0.05. Actual onsite calibration shows that the system has high accuracy, and is easy to operate with satisfactory stability.

  15. Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth...

    Office of Environmental Management (EM)

    Review of the Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant Why DOE-EM Did This Review The On-Site Waste Disposal Facility (OSWDF) is ...

  16. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies through the PPA evaluation and implementation process.

  17. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Financing » Renewable Energy Procurement » Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies

  18. " Onsite Generation from Noncombustible Renewable Energy",2.6

    U.S. Energy Information Administration (EIA) Indexed Site

    .5 Relative Standard Errors for Table 1.5;" " Unit: Percents." " "," " ,"Total" "Energy Source","First Use" ,"Total United States" "Coal ",1.2 "Natural Gas",1.8 "Net Electricity",2.2 " Purchases",2.1 " Transfers In",4.6 " Onsite Generation from Noncombustible Renewable Energy",2.6 " Sales and Transfers Offsite",0.3 "Coke and Breeze",0.6

  19. ONSITE TRANSPORTATION AUTHORIZATION CHALLENGES AT THE SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Watkins, R.; Loftin, B.; Hoang, D.; Maxted, M.

    2012-05-30

    Prior to 2008, transfers of radioactive material within the Savannah River Site (SRS) boundary, referred to as onsite transfers, were authorized by Transportation Safety Basis (TSB) documents that only required approval by the SRS contractor. This practice was in accordance with the existing SRS Transportation Safety Document (TSD). In 2008 the Department of Energy Savannah River Field Office (DOE-SR) requested that the SRS TSD be revised to require DOE-SR approval of all Transportation Safety Basis (TSB) documents. As a result, the primary SRS contractor embarked on a multi-year campaign to consolidate old or generate new TSB documents and obtain DOE-SR approval for each. This paper focuses on the challenges incurred during the rewriting or writing of and obtaining DOE-SR approval of all Savannah River Site Onsite Transportation Safety Basis documents.

  20. Safety evaluation for packaging (onsite) nitrogen trailers propane tanks

    SciTech Connect (OSTI)

    Ferrell, P.C.

    1998-01-28

    The purpose of the Safety Evaluation for Packaging (SEP) is the evaluation and authorization of the onsite transport of propane tanks that are mounted on the Lockheed Martin Hanford Corporation Characterization Project`s nitrogen trailers. This SEP authorizes onsite transport of the nitrogen trailers, including the propane tanks, until May 31, 1998. The three nitrogen trailers (HO-64-4966, HO-64-4968, and HO-64-5170) are rated for 1,361 kg (30,000 lb) and are equipped with tandem axles and pintel hitches. Permanently mounted on each trailer is a 5,678 L (1,500 gal) cryogenic dewar that is filled with nitrogen, and a propane fired water bath vaporizer system, and a 454 L (1 20 gal) propane tank. The nitrogen trailer system is operated only when it is disconnected from the tow vehicle and is leveled and stabilized. When the trailers are transported, the propane tanks are isolated via closed supply valves.

  1. Voluntary Protection Program Onsite Review of Wackenhut Services Inc, March

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy Review of Wackenhut Services Inc, March 2007 Voluntary Protection Program Onsite Review of Wackenhut Services Inc, March 2007 March 2007 Evaluation to determine whether the applicant is continuing to perform at a level deserving VPP recognition. This report summarizes the results of the HSS DOE-VPP Team's evaluation of Wackenhut Services Inc. during the period of March 19-30, 2007, and provides the Chief Health, Safety and Security Officer with the necessary

  2. Voluntary Protection Program Onsite Review, Centerra-Nevada - May 2015 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Centerra-Nevada - May 2015 Voluntary Protection Program Onsite Review, Centerra-Nevada - May 2015 May 2015 Recertification of Centerra-Nevada as a Conditional Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Centerra-Nevada at the Nevada Nuclear Security Site, Las Vegas, Nevada, during the period of May 12-21, 2015, and provides the Associate Under Secretary for AU with the necessary

  3. Voluntary Protection Program Onsite Review, Facility Engineering Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    KCP, LLC - September 2012 | Department of Energy Facility Engineering Services KCP, LLC - September 2012 Voluntary Protection Program Onsite Review, Facility Engineering Services KCP, LLC - September 2012 September 2012 Evaluation to determine whether Facility Engineering Services KCP, LLC is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during September 10-14, 2012 to determine whether Facility Engineering Services KCP, LLC is continuing

  4. Voluntary Protection Program Onsite Review, Fluor Federal Services, Inc.,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland, Washington - June 2011 | Department of Energy Fluor Federal Services, Inc., Richland, Washington - June 2011 Voluntary Protection Program Onsite Review, Fluor Federal Services, Inc., Richland, Washington - June 2011 June 2011 Evaluation to determine whether Fluor Federal Services, Inc., subcontractor on the Hanford Plateau Remediation Contract, is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during June 6-9, 2011 to determine

  5. Voluntary Protection Program Onsite Review, Hanford Mission Support

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract - October 2011 | Department of Energy Hanford Mission Support Contract - October 2011 Voluntary Protection Program Onsite Review, Hanford Mission Support Contract - October 2011 October 2011 Evaluation to determine whether Hanford Mission Support Contract is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during September 26-October 6, 2011, to determine whether Mission Support Alliance, LLC is continuing to perform at a level

  6. Voluntary Protection Program Onsite Review, IDAHO NATIONAL LABORATORY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battelle Energy Alliance, LLC May 2006 | Department of Energy IDAHO NATIONAL LABORATORY Battelle Energy Alliance, LLC May 2006 Voluntary Protection Program Onsite Review, IDAHO NATIONAL LABORATORY Battelle Energy Alliance, LLC May 2006 May 2006 This report summarizes the results of the HSS DOE-VPP Team's evaluation of Battelle Energy Alliance (BEA) during the period of May 8-12, 2006, and provides the Chief Health, Safety and Security Officer with the necessary information to make the final

  7. Voluntary Protection Program Onsite Review, Mission Support Alliance, Llc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Mission Support Contract - September 2014 | Department of Energy Mission Support Alliance, Llc Hanford Mission Support Contract - September 2014 Voluntary Protection Program Onsite Review, Mission Support Alliance, Llc Hanford Mission Support Contract - September 2014 September 2014 Recertification of MSA/MSC as a "Conditional" Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the DOE-VPP evaluation of Mission Support

  8. Voluntary Protection Program Onsite Review, Nuclear Waste Partnership, LLC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - March 2015 | Department of Energy Nuclear Waste Partnership, LLC - March 2015 Voluntary Protection Program Onsite Review, Nuclear Waste Partnership, LLC - March 2015 March 2015 Certification of NWP as a Merit Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Nuclear Waste Partnership, LLC (NWP), at the Waste Isolation Pilot Plant in Carlsbad, New Mexico, during the period of March 17-27, 2015, and provides the

  9. Voluntary Protection Program Onsite Review, Pantex Plant - February 2010 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Pantex Plant - February 2010 Voluntary Protection Program Onsite Review, Pantex Plant - February 2010 February 2010 Evaluation to determine whether the Amarillo, Texas Pantex Plant is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during February 15-26, 2010 to determine whether Babcock & Wilcox Technical Services Pantex, LLC is continuing to perform at a level deserving DOE-VPP Star recognition. Voluntary

  10. Voluntary Protection Program Onsite Review, Report from the Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy - February 2012 | Department of Energy Report from the Department of Energy - February 2012 Voluntary Protection Program Onsite Review, Report from the Department of Energy - February 2012 February 2012 This report summarizes the results of the HSS DOE-VPP Team's evaluation of Report from the Department of Energy during the period of February 13-22, 2012, and provides the Chief Health, Safety and Security Officer with the necessary information to make the final decision regarding the

  11. Voluntary Protection Program Onsite Review, Savannah River Nuclear

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solutions, Llc Savannah River Site - October 2014 | Department of Energy River Nuclear Solutions, Llc Savannah River Site - October 2014 Voluntary Protection Program Onsite Review, Savannah River Nuclear Solutions, Llc Savannah River Site - October 2014 October 2014 Recertification of SRNS as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Savannah River Nuclear Solutions, LLC (SRNS), at the Savannah River

  12. Voluntary Protection Program Onsite Review, Savannah River Remediation,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Llc, Liquid Waste Contract, Savannah River Site - November 2014 | Department of Energy River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 November 2014 Recertification of SRR as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Savannah River

  13. Voluntary Protection Program Onsite Review, Tank Farm Operations Contract -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2010 | Department of Energy Tank Farm Operations Contract - November 2010 Voluntary Protection Program Onsite Review, Tank Farm Operations Contract - November 2010 November 2010 Evaluation to determine whether the Tank Farm Operations Contract is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during November 1 - 11, 2010 to determine whether Washington River Protection Solutions, LLC is continuing to perform at a level deserving

  14. Voluntary Protection Program Onsite Review, Transuranic Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center - September 2012 | Department of Energy Transuranic Waste Processing Center - September 2012 Voluntary Protection Program Onsite Review, Transuranic Waste Processing Center - September 2012 September 2012 Evaluation to determine whether Transuranic Waste Processing Center is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during September 10-13, 2012 to determine whether Wastren Advantage, Inc. is continuing to perform at a level

  15. Voluntary Protection Program Onsite Review, WSI-Nevada - Nevada National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Site - February 2012 | Department of Energy WSI-Nevada - Nevada National Security Site - February 2012 Voluntary Protection Program Onsite Review, WSI-Nevada - Nevada National Security Site - February 2012 February 2012 Evaluation to determine whether the Nevada National Security Site is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during February 13 - 22, 2012 to determine whether WSI-Nevada is continuing to perform at a level

  16. Voluntary Protection Program Onsite Review, Y-12 National Security Complex

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - April 2012 | Department of Energy Y-12 National Security Complex - April 2012 Voluntary Protection Program Onsite Review, Y-12 National Security Complex - April 2012 April 2012 Evaluation to determine whether Y-12 National Security Complex is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during April 10-19, 2012 to determine whether Babcock & Wilcox Technical Services Y-12, LLC is continuing to perform at a level deserving DOE-VPP

  17. Safety Evaluation for Packaging (onsite) T Plant Canyon Items

    SciTech Connect (OSTI)

    OBRIEN, J.H.

    2000-07-14

    This safety evaluation for packaging (SEP) evaluates and documents the ability to safely ship mostly unique inventories of miscellaneous T Plant canyon waste items (T-P Items) encountered during the canyon deck clean off campaign. In addition, this SEP addresses contaminated items and material that may be shipped in a strong tight package (STP). The shipments meet the criteria for onsite shipments as specified by Fluor Hanford in HNF-PRO-154, Responsibilities and Procedures for all Hazardous Material Shipments.

  18. Safety analysis report for packaging (onsite) steel drum

    SciTech Connect (OSTI)

    McCormick, W.A.

    1998-09-29

    This Safety Analysis Report for Packaging (SARP) provides the analyses and evaluations necessary to demonstrate that the steel drum packaging system meets the transportation safety requirements of HNF-PRO-154, Responsibilities and Procedures for all Hazardous Material Shipments, for an onsite packaging containing Type B quantities of solid and liquid radioactive materials. The basic component of the steel drum packaging system is the 208 L (55-gal) steel drum.

  19. Safety analysis report for packaging (onsite) sample pig transport system

    SciTech Connect (OSTI)

    MCCOY, J.C.

    1999-03-16

    This Safety Analysis Report for Packaging (SARP) provides a technical evaluation of the Sample Pig Transport System as compared to the requirements of the U.S. Department of Energy, Richland Operations Office (RL) Order 5480.1, Change 1, Chapter III. The evaluation concludes that the package is acceptable for the onsite transport of Type B, fissile excepted radioactive materials when used in accordance with this document.

  20. Voluntary Protection Program Onsite Review, Advanced Technologies and

    Office of Environmental Management (EM)

    2007 | Department of Energy Review of Wackenhut Services Inc, March 2007 Voluntary Protection Program Onsite Review of Wackenhut Services Inc, March 2007 March 2007 Evaluation to determine whether the applicant is continuing to perform at a level deserving VPP recognition. This report summarizes the results of the HSS DOE-VPP Team's evaluation of Wackenhut Services Inc. during the period of March 19-30, 2007, and provides the Chief Health, Safety and Security Officer with the necessary

  1. Voluntary Protection Program Onsite Review, Los Alamos National Laboratory

    Office of Environmental Management (EM)

    KCP, LLC - September 2012 | Department of Energy Facility Engineering Services KCP, LLC - September 2012 Voluntary Protection Program Onsite Review, Facility Engineering Services KCP, LLC - September 2012 September 2012 Evaluation to determine whether Facility Engineering Services KCP, LLC is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during September 10-14, 2012 to determine whether Facility Engineering Services KCP, LLC is continuing

  2. Voluntary Protection Program Onsite Review, Los Alamos National Security,

    Office of Environmental Management (EM)

    Llc Los Alamos National Laboratory, Los Alamos, New Mexico - April 2014 | Department of Energy Llc Los Alamos National Laboratory, Los Alamos, New Mexico - April 2014 Voluntary Protection Program Onsite Review, Los Alamos National Security, Llc Los Alamos National Laboratory, Los Alamos, New Mexico - April 2014 April 2014 Annual Merit Review of LANS at Los Alamos National Laboratory for continued participation in the Department of Energy Voluntary Protection Program. This report presents the

  3. Voluntary Protection Program Onsite Review, Oak Ridge Associated

    Office of Environmental Management (EM)

    Hanford Mission Support Contract - September 2014 | Department of Energy Mission Support Alliance, Llc Hanford Mission Support Contract - September 2014 Voluntary Protection Program Onsite Review, Mission Support Alliance, Llc Hanford Mission Support Contract - September 2014 September 2014 Recertification of MSA/MSC as a "Conditional" Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the DOE-VPP evaluation of Mission Support

  4. Voluntary Protection Program Onsite Review, Portsmouth Facility Support

    Office of Environmental Management (EM)

    Department of Energy Pantex Plant - February 2010 Voluntary Protection Program Onsite Review, Pantex Plant - February 2010 February 2010 Evaluation to determine whether the Amarillo, Texas Pantex Plant is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during February 15-26, 2010 to determine whether Babcock & Wilcox Technical Services Pantex, LLC is continuing to perform at a level deserving DOE-VPP Star recognition. Voluntary

  5. Voluntary Protection Program Onsite Review, Safeguards and Security -

    Office of Environmental Management (EM)

    Energy - February 2012 | Department of Energy Report from the Department of Energy - February 2012 Voluntary Protection Program Onsite Review, Report from the Department of Energy - February 2012 February 2012 This report summarizes the results of the HSS DOE-VPP Team's evaluation of Report from the Department of Energy during the period of February 13-22, 2012, and provides the Chief Health, Safety and Security Officer with the necessary information to make the final decision regarding the

  6. Voluntary Protection Program Onsite Review, Washington Closure Hanford VPP

    Office of Environmental Management (EM)

    Solutions, Llc Savannah River Site - October 2014 | Department of Energy Savannah River Nuclear Solutions, Llc Savannah River Site - October 2014 Voluntary Protection Program Onsite Review, Savannah River Nuclear Solutions, Llc Savannah River Site - October 2014 October 2014 Recertification of SRNS as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Savannah River Nuclear Solutions, LLC (SRNS), at the

  7. "Code(a)","Subsector and Industry","Source(b)","Electricity(c)","Fuel Oil","Fuel Oil(d)","Natural Gas(e)","NGL(f)","Coal","Breeze","Other(g)","Produced Onsite(h)"

    U.S. Energy Information Administration (EIA) Indexed Site

    1.4 Relative Standard Errors for Table 1.4;" " Unit: Percents." ,,"Any",,,,,,,,,"Shipments" "NAICS",,"Energy","Net","Residual","Distillate",,"LPG and",,"Coke and",,"of Energy Sources" "Code(a)","Subsector and Industry","Source(b)","Electricity(c)","Fuel Oil","Fuel Oil(d)","Natural

  8. Energy Department Announces $15 Million to Integrate Affordable Solar Energy into Nation’s Electrical Grid

    Broader source: Energy.gov [DOE]

    Supporting the goals of the Obama Administration’s Climate Action Plan, the Energy Department today announced $15 million in available funding to help integrate distributed, on-site solar energy systems into the nation’s electrical grid.

  9. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Renewable Energy Procurement » Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land

  10. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land use agreements, and more.

  11. Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant | Department of Energy Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant Full Document and Summary Versions are available for download Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant (436.49 KB) Summary - Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant (47.06 KB) More Documents & Publications Briefing: DOE EM ITR Landfill

  12. Onsite Gaseous Centrifuge Enrichment Plant UF6 Cylinder Destructive Analysis

    SciTech Connect (OSTI)

    Anheier, Norman C.; Cannon, Bret D.; Qiao, Hong; Carter, Jennifer C.; McNamara, Bruce K.; O'Hara, Matthew J.; Phillips, Jon R.; Curtis, Michael M.

    2012-07-17

    The IAEA safeguards approach for gaseous centrifuge enrichment plants (GCEPs) includes measurements of gross, partial, and bias defects in a statistical sampling plan. These safeguard methods consist principally of mass and enrichment nondestructive assay (NDA) verification. Destructive assay (DA) samples are collected from a limited number of cylinders for high precision offsite mass spectrometer analysis. DA is typically used to quantify bias defects in the GCEP material balance. Under current safeguards measures, the operator collects a DA sample from a sample tap following homogenization. The sample is collected in a small UF6 sample bottle, then sealed and shipped under IAEA chain of custody to an offsite analytical laboratory. Current practice is expensive and resource intensive. We propose a new and novel approach for performing onsite gaseous UF6 DA analysis that provides rapid and accurate assessment of enrichment bias defects. DA samples are collected using a custom sampling device attached to a conventional sample tap. A few micrograms of gaseous UF6 is chemically adsorbed onto a sampling coupon in a matter of minutes. The collected DA sample is then analyzed onsite using Laser Ablation Absorption Ratio Spectrometry-Destructive Assay (LAARS-DA). DA results are determined in a matter of minutes at sufficient accuracy to support reliable bias defect conclusions, while greatly reducing DA sample volume, analysis time, and cost.

  13. Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth...

    Office of Environmental Management (EM)

    Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant Full Document ...

  14. Using Electricity",,,"Electricity Consumption",,,"Electricity...

    U.S. Energy Information Administration (EIA) Indexed Site

    . Total Electricity Consumption and Expenditures, 2003" ,"All Buildings* Using Electricity",,,"Electricity Consumption",,,"Electricity Expenditures" ,"Number of Buildings...

  15. Development of Onsite Transportation Safety Documents for Nevada Test Site

    SciTech Connect (OSTI)

    Frank Hand, Willard Thomas, Frank Sciacca, Manny Negrete, Susan Kelley

    2008-05-08

    Department of Energy (DOE) Orders require each DOE site to develop onsite transportation safety documents (OTSDs). The Nevada Test Site approach divided all onsite transfers into two groups with each group covered by a standalone OTSD identified as Non-Nuclear and Nuclear. The Non-Nuclear transfers involve all radioactive hazardous material in less than Hazard Category (HC)-3 quantities and all chemically hazardous materials. The Nuclear transfers involve all radioactive material equal to or greater than HC-3 quantities and radioactive material mated with high explosives regardless of quantity. Both OTSDs comply with DOE O 460.1B requirements. The Nuclear OTSD also complies with DOE O 461.1A requirements and includes a DOE-STD-3009 approach to hazard analysis (HA) and accident analysis as needed. All Nuclear OTSD proposed transfers were determined to be non-equivalent and a methodology was developed to determine if equivalent safety to a fully compliant Department of Transportation (DOT) transfer was achieved. For each HA scenario, three hypothetical transfers were evaluated: a DOT-compliant, uncontrolled, and controlled transfer. Equivalent safety is demonstrated when the risk level for each controlled transfer is equal to or less than the corresponding DOT-compliant transfer risk level. In this comparison the typical DOE-STD-3009 risk matrix was modified to reflect transportation requirements. Design basis conditions (DBCs) were developed for each non-equivalent transfer. Initial DBCs were based solely upon the amount of material present. Route-, transfer-, and site-specific conditions were evaluated and the initial DBCs revised as needed. Final DBCs were evaluated for each transfers packaging and its contents.

  16. On-Site Renewable Power Purchase Agreements for Renewable Energy Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    An on-site renewable power purchase agreement (PPA) enables Federal agencies to fund a renewable energy project by contracting to purchase the power generated by the system. The renewable energy equipment is installed and owned by a developer but located on-site at the agency facility.

  17. On-site waste storage assuring the success of on-site, low-level nuclear waste storage

    SciTech Connect (OSTI)

    Preston, E.L.

    1986-09-21

    Waste management has reached paramount importance in recent years. The successful management of radioactive waste is a key ingredient in the successful operation of any nuclear facility. This paper discusses the options available for on-site storage of low-level radioactive waste and those options that have been selected by the Department of Energy facilities operated by Martin Marietta Energy Systems, Inc. in Oak Ridge, Tennessee. The focus of the paper is on quality assurance (QA) features of waste management activities such as accountability and retrievability of waste materials and waste packages, retrievability of data, waste containment, safety and environmental monitoring. Technical performance and careful documentation of that performance are goals which can be achieved only through the cooperation of numerous individuals from waste generating and waste managing organizations, engineering, QA, and environmental management.

  18. OSIRIS - Gamma-Ray Spectroscopy Software for On-Site Inspections under the Comprehensive Nuclear-Test-Ban Treaty

    SciTech Connect (OSTI)

    Caffrey, Augustine J.; Bowyer, Ted W.; Egger, A. E.; Hall, Jeter C.; Kelly, S. M.; Krebs, K. M.; Kreek, S.; Jordan, David V.; Milbrath, Brian D.; Padgett, Stephen W.; Wharton, C. J.; Wimer, Nathan G.

    2015-06-01

    OSIRIS - Gamma-Ray Spectroscopy Software for On-Site Inspections under the Comprehensive Nuclear-Test-Ban Treaty

  19. Table N13.2. Electricity: Components of Onsite Generation, 1998

    U.S. Energy Information Administration (EIA) Indexed Site

    ,,"Total United States" ,"RSE Column ... *",48.4 324,"Petroleum and Coal Products",17078,15985,0,1093,5.7 324110," Petroleum Refineries"," ...

  20. Using Electricity",,,"Electricity Consumption",,,"Electricity...

    U.S. Energy Information Administration (EIA) Indexed Site

    A. Total Electricity Consumption and Expenditures for All Buildings, 2003" ,"All Buildings Using Electricity",,,"Electricity Consumption",,,"Electricity Expenditures" ,"Number of...

  1. Electricity",,,"Electricity Consumption",,,"Electricity Expenditures...

    U.S. Energy Information Administration (EIA) Indexed Site

    C9. Total Electricity Consumption and Expenditures, 1999" ,"All Buildings Using Electricity",,,"Electricity Consumption",,,"Electricity Expenditures" ,"Number of Buildings...

  2. Electricity",,,"Electricity Consumption",,,"Electricity Expenditures...

    U.S. Energy Information Administration (EIA) Indexed Site

    DIV. Total Electricity Consumption and Expenditures by Census Division, 1999" ,"All Buildings Using Electricity",,,"Electricity Consumption",,,"Electricity Expenditures" ,"Number...

  3. The Residential Building Characteristics On-Site Inspection: summary Report

    SciTech Connect (OSTI)

    Weakley, S.A.; Darwin, R.F.; Howe, T.L.

    1990-06-01

    The Residential Building Characteristics On-Site Inspection (RI) was sponsored by the Bonneville Power Administration (BPA), and implemented by Energy Counselors, Inc., of Beaverton, Oregon. The purpose of the inspection was to collect detailed information on the structural characteristics and capital equipment of residences participating in BPA's End-Use Load and Conservation Assessment Program (ELCAP). ELCAP is a long-term program to collect information on the structural characteristics of residences in the Pacific Northwest as well as the attitudinal, behavioral, and demographic characteristics of the residences' occupants. Combined with other data collection efforts, the information obtained by the RI will be used to assess and evaluate energy use and conservation within the region's residential sector. This report documents the design of the inspection instruments (forms), the implementation of the inspection, and some of the results from the data base. The number of residences inspected was 416 or 93% of the potential sample of 447 residences. 1 ref., 2 figs., 38 tabs.

  4. Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant

    Office of Environmental Management (EM)

    OH EM Project: On-Site Disposal Facility ETR Report Date: February 2008 ETR-12 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant Why DOE-EM Did This Review The On-Site Waste Disposal Facility (OSWDF) is proposed for long-term containment of contaminated materials from the planned Decontamination and Decommissioning (D&D) activities at the

  5. Response G-1: The decision to construct an on-site disposal...

    Office of Legacy Management (LM)

    Response G-1: The decision to construct an on-site disposal facility was reached through a public process and the affected communities in St. Charles County reached a consensus...

  6. On-site cable testing with a resonant test set and an additional partial discharge measurement

    SciTech Connect (OSTI)

    Schichler, U.; Borsi, H.; Gockenbach, E.

    1996-12-31

    With an on-site voltage test it is possible to evaluate polymer insulated cables after laying, repairing or some years in operation. The on-site cable testing can be done easily with frequency tuned series resonant test sets which are still available for testing of medium and high voltage cables. Some tested cables failed after a short time in operation although they had passed the previous voltage test without breakdown. A combination of the voltage test with an additional partial discharge (PD) measurement can increase the test efficiency, but the on-site PD measurement has a lot of difficulties caused by ambient noise. The paper describes results of on-site medium voltage cable testing with a frequency tuned resonant test set and an additional PD measurement with a special PD measuring system.

  7. Voluntary Protection Program Onsite Review, CH2M HILL B&W West...

    Office of Environmental Management (EM)

    B&W West Valley LLC, West Valley Demonstration Project - October 2013 Voluntary Protection Program Onsite Review, CH2M HILL B&W West Valley LLC, West Valley Demonstration Project - ...

  8. NNSA hosts international CTBT on-site inspection experts at Nevada...

    National Nuclear Security Administration (NNSA)

    a former nuclear explosive test site. Here they are pictured on the edge of the Sedan Crater. This month, NNSA hosted a Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site ...

  9. NNSA hosts international CTBT on-site inspection experts at Nevada National

    National Nuclear Security Administration (NNSA)

    Security Site | National Nuclear Security Administration | (NNSA) hosts international CTBT on-site inspection experts at Nevada National Security Site Thursday, May 26, 2016 - 2:26pm CTBT surrogate inspectors and other inspection experts visited the Nevada National Security Site, a former nuclear explosive test site. Here they are pictured on the edge of the Sedan Crater. This month, NNSA hosted a Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site inspection activity at the Nevada National

  10. Request for Comments on Including Onsite Renewable Energy Generation under Energy Savings Performance Contracts

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments on Including Onsite Renewable Energy Generation under Energy Savings Performance Contracts February 2, 2016 The purpose of this request for comments is to obtain information on potential obstacles associated with the implementation of onsite renewable energy generation projects under the federal energy savings performance contract (ESPC) authority, including potential issues with regard to project eligibility for the federal solar investment tax credit (ITC) and the use of the ESPC

  11. REPORT OF ON-SITE INSPECTION WORKSHOP-16

    SciTech Connect (OSTI)

    Sweeney, J J

    2009-07-07

    The central issue addressed by this workshop was the task of making the on-site inspection (OSI) part of the Comprehensive Nuclear-Test-Ban Treaty verification system operationally ready at entry into force of the Treaty. It is recognized, and this was emphasized by the 2008 OSI Integrated Field Exercise (IFE), that it is not possible to develop every part of the OSI regime simultaneously. Therefore, it is necessary to prioritize the approach to OSI readiness. The reviews of the IFE have pointed to many elements of OSI readiness that still need development. The objective of this workshop was to provide priorities for the path forward for Working Group B to consider. Several critical areas have been identified that are related to the development of OSI readiness: (1) Technology development: Priorities are radionuclide and noble gas sampling and analysis, visual observation, multispectral/infrared imaging methods, active seismic methods and the recognition of the importance of signatures. (2) Organizational development: Priorities are health and safety, the Operations Support Centre, the Equipment Storage and Maintenance Facility, information technology data flow and communications. (3) Resources: The expertise to develop key parts of the OSI regime is not available within the current OSI Division staff. To develop these aspects of the regime will require more staff or supplements to the staff with cost-free experts or other means. Aspects of the system that could benefit from more staff include radionuclide and noble gas detection methods, data flow and communications, visual observation, multispectral/infrared methods and health and safety. As the path forward, participants of this workshop recognized a need to optimize the development of OSI priorities. The outcome of this workshop is to suggest for consideration an operational approach to OSI readiness that utilizes results of an evaluation of the relative effectiveness of OSI elements versus their relative

  12. Electrical Circuit Tester

    DOE Patents [OSTI]

    Love, Frank

    2006-04-18

    An electrical circuit testing device is provided, comprising a case, a digital voltage level testing circuit with a display means, a switch to initiate measurement using the device, a non-shorting switching means for selecting pre-determined electrical wiring configurations to be tested in an outlet, a terminal block, a five-pole electrical plug mounted on the case surface and a set of adapters that can be used for various multiple-pronged electrical outlet configurations for voltages from 100 600 VAC from 50 100 Hz.

  13. Department of Energy Voluntary Protection Program - Part IV: Onsite review handbook

    SciTech Connect (OSTI)

    1995-07-01

    Onsite Review Handbook contains criteria to be used in evaluating the management systems required for initial or continued participation in the Department of Energy Voluntary Protection Program (DOE-VPP), verifying and calculating rates of injury experience, the Onsite Review report format, and sample questions to be used during onsite interviews. This document should be used in conjunction with the first three DOE-VPP manuals (Part I: Program Elements, Part II: Procedures Manual, and Part III: Application Guidelines). This document is intended to assist Onsite Review team members and DOE contractors in evaluating safety and health programs, and to serve as guidance for DOE-VPP participants in performing their required annual evaluation. Requests for additional information or any questions may be addressed to a DOE-VPP Coordinator in the Office of Occupational Safety and Health Policy. The term contractor used throughout this document refers to an applicant to, or a participant in, the DOE-VPP. The term subcontractor refers to any organization that is contracted by the applicant or participant to do work at the site under review. The DOE-VPP Onsite Review Criteria contained in Appendix A provide guidance for evaluating a site`s implementation of the program requirements given in Part I: Program Elements. The program requirements are in bold italicized type, followed by guidance for ensuring implementation. Part I should be consulted for a complete description of the program requirements. These criteria should be used by team members whenever possible, but are not intended to be all inclusive. Determination of adequate implementation of the DOE-VPP requirements is at the team members` discretion. Guidance for calculating recordable injury and lost workday incidence rates is contained in Appendix B. The OSHA injury/illness records review and the associated calculations should be performed by Onsite Review Team members during the pre-onsite planning visit.

  14. Thermoacoustic magnetohydrodynamic electrical generator

    DOE Patents [OSTI]

    Wheatley, J.C.; Swift, G.W.; Migliori, A.

    1984-11-16

    A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

  15. Integrated electrical connector

    DOE Patents [OSTI]

    Benett, William J.; Ackler, Harold D.

    2005-05-24

    An electrical connector is formed from a sheet of electrically conductive material that lies in between the two layers of nonconducting material that comprise the casing of an electrical chip. The connector is electrically connected to an electrical element embedded within the chip. An opening in the sheet is concentrically aligned with a pair of larger holes respectively bored through the nonconducting layers. The opening is also smaller than the diameter of an electrically conductive contact pin. However, the sheet is composed flexible material so that the opening adapts to the diameter of the pin when the pin is inserted therethrough. The periphery of the opening applies force to the sides of the pin when the pin is inserted, and thus holds the pin within the opening and in contact with the sheet, by friction. The pin can be withdrawn from the connector by applying sufficient axial force.

  16. Thermoacoustic magnetohydrodynamic electrical generator

    DOE Patents [OSTI]

    Wheatley, John C.; Swift, Gregory W.; Migliori, Albert

    1986-01-01

    A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1,000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

  17. On-Site Inspection RadioIsotopic Spectroscopy (Osiris) System Development

    SciTech Connect (OSTI)

    Caffrey, Gus J.; Egger, Ann E.; Krebs, Kenneth M.; Milbrath, B. D.; Jordan, D. V.; Warren, G. A.; Wilmer, N. G.

    2015-09-01

    We have designed and tested hardware and software for the acquisition and analysis of high-resolution gamma-ray spectra during on-site inspections under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The On-Site Inspection RadioIsotopic Spectroscopy—Osiris—software filters the spectral data to display only radioisotopic information relevant to CTBT on-site inspections, e.g.,132I. A set of over 100 fission-product spectra was employed for Osiris testing. These spectra were measured, where possible, or generated by modeling. The synthetic test spectral compositions include non-nuclear-explosion scenarios, e.g., a severe nuclear reactor accident, and nuclear-explosion scenarios such as a vented underground nuclear test. Comparing its computer-based analyses to expert visual analyses of the test spectra, Osiris correctly identifies CTBT-relevant fission product isotopes at the 95% level or better.The Osiris gamma-ray spectrometer is a mechanically-cooled, battery-powered ORTEC Transpec-100, chosen to avoid the need for liquid nitrogen during on-site inspections. The spectrometer was used successfully during the recent 2014 CTBT Integrated Field Exercise in Jordan. The spectrometer is controlled and the spectral data analyzed by a Panasonic Toughbook notebook computer. To date, software development has been the main focus of the Osiris project. In FY2016-17, we plan to modify the Osiris hardware, integrate the Osiris software and hardware, and conduct rigorous field tests to ensure that the Osiris system will function correctly during CTBT on-site inspections. The planned development will raise Osiris to technology readiness level TRL-8; transfer the Osiris technology to a commercial manufacturer, and demonstrate Osiris to potential CTBT on-site inspectors.

  18. Safety evaluation for packaging (onsite) type B shipment of 222-S cargo tank

    SciTech Connect (OSTI)

    Edwards, W.S., Fluor Daniel Hanford

    1997-02-27

    This safety evaluation for packaging (SEP) document was developed to provide safety evaluations necessary to approve the transfer of the 222-S Cargo Tank from the 222-S Lab to the 204-AR Transfer Station. The SEP demonstrates that the onsite transfer will provide an equivalent degree of safety as would be provided by a package meeting the U.S. Department of Transportation requirements. This fulfills the onsite transportation safety requirements implemented in WHC-CM-2-14, Hazardous Material Packaging and Shipping.

  19. Voluntary Protection Program Onsite Review, CH2M HILL B&W West Valley LLC,

    Office of Environmental Management (EM)

    West Valley Demonstration Project - October 2013 | Department of Energy B&W West Valley LLC, West Valley Demonstration Project - October 2013 Voluntary Protection Program Onsite Review, CH2M HILL B&W West Valley LLC, West Valley Demonstration Project - October 2013 Octover 24, 2013 Evaluation to determine whether CH2M HILL B&W West Valley LLC, West Valley Demonstration Project is performing at a level deserving DOE-VPP Star recognition. Voluntary Protection Program Onsite Review,

  20. Adaptive protection algorithm and system

    DOE Patents [OSTI]

    Hedrick, Paul (Pittsburgh, PA) [Pittsburgh, PA; Toms, Helen L. (Irwin, PA) [Irwin, PA; Miller, Roger M. (Mars, PA) [Mars, PA

    2009-04-28

    An adaptive protection algorithm and system for protecting electrical distribution systems traces the flow of power through a distribution system, assigns a value (or rank) to each circuit breaker in the system and then determines the appropriate trip set points based on the assigned rank.

  1. Adaptive Thresholds

    Energy Science and Technology Software Center (OSTI)

    2014-08-26

    ADAPT is a topological analysis code that allow to compute local threshold, in particular relevance based thresholds for features defined in scalar fields. The initial target application is vortex detection but the software is more generally applicable to all threshold based feature definitions.

  2. Visual Sample Plan (VSP) Statistical Software as Related to the CTBTOs On-Site Inspection Procedure

    SciTech Connect (OSTI)

    Pulsipher, Trenton C.; Walsh, Stephen J.; Pulsipher, Brent A.; Milbrath, Brian D.

    2010-09-01

    In the event of a potential nuclear weapons test the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) is commissioned to conduct an on-site investigation (OSI) of the suspected test site in an effort to find confirmatory evidence of the nuclear test. The OSI activities include collecting air, surface soil, and underground samples to search for indications of a nuclear weapons test - these indicators include radionuclides and radioactive isotopes Ar and Xe. This report investigates the capability of the Visual Sample Plan (VSP) software to contribute to the sampling activities of the CTBTO during an OSI. VSP is a statistical sampling design software, constructed under data quality objectives, which has been adapted for environmental remediation and contamination detection problems for the EPA, US Army, DoD and DHS among others. This report provides discussion of a number of VSP sample designs, which may be pertinent to the work undertaken during an OSI. Examples and descriptions of such designs include hot spot sampling, combined random and judgment sampling, multiple increment sampling, radiological transect surveying, and a brief description of other potentially applicable sampling methods. Further, this work highlights a potential need for the use of statistically based sample designs in OSI activities. The use of such designs may enable canvassing a sample area without full sampling, provide a measure of confidence that radionuclides are not present, and allow investigators to refocus resources in other areas of concern.

  3. Electric Vehicles

    Broader source: Energy.gov [DOE]

    This album contains a variety of all-electric, plug-in hybrid electric and fuel cell electric vehicles. For a full list of all electric vehicles visit the EV Everywhere website.

  4. FEMP Offers Training on Federal On-Site Renewable Power Purchase Agreements

    Broader source: Energy.gov [DOE]

    This refreshed eTraining core course provides federal energy and facility managers and contracting officers with up-to-date knowledge and best practices for developing an on-site renewable power purchase agreement (PPA) on a federal site and includes current definitions, references, and guidance to help launch or accelerate a PPA project.

  5. Adaptive sampler

    DOE Patents [OSTI]

    Watson, Bobby L.; Aeby, Ian

    1982-01-01

    An adaptive data compression device for compressing data having variable frequency content, including a plurality of digital filters for analyzing the content of the data over a plurality of frequency regions, a memory, and a control logic circuit for generating a variable rate memory clock corresponding to the analyzed frequency content of the data in the frequency region and for clocking the data into the memory in response to the variable rate memory clock.

  6. Adaptive sampler

    DOE Patents [OSTI]

    Watson, B.L.; Aeby, I.

    1980-08-26

    An adaptive data compression device for compressing data is described. The device has a frequency content, including a plurality of digital filters for analyzing the content of the data over a plurality of frequency regions, a memory, and a control logic circuit for generating a variable rate memory clock corresponding to the analyzed frequency content of the data in the frequency region and for clocking the data into the memory in response to the variable rate memory clock.

  7. Field sampling and selecting on-site analytical methods for explosives in soil

    SciTech Connect (OSTI)

    Crockett, A.B.; Craig, H.D.; Jenkins, T.F.; Sisk, W.E.

    1996-12-01

    A large number of defense-related sites are contaminated with elevated levels of secondary explosives. Levels of contamination range from barely detectable to levels above 10% that need special handling because of the detonation potential. Characterization of explosives-contaminated sites is particularly difficult because of the very heterogeneous distribution of contamination in the environment and within samples. To improve site characterization, several options exist including collecting more samples, providing on-site analytical data to help direct the investigation, compositing samples, improving homogenization of the samples, and extracting larger samples. This publication is intended to provide guidance to Remedial Project Managers regarding field sampling and on-site analytical methods for detecting and quantifying secondary explosive compounds in soils, and is not intended to include discussions of the safety issues associated with sites contaminated with explosive residues.

  8. Portable Analytical Systems for On-Site Diagnosis of Exposure to Pesticides and Nerve Agents

    SciTech Connect (OSTI)

    Lin, Yuehe; Wang, Jun; Liu, Guodong; Timchalk, Chuck

    2009-12-01

    In this chapter, we summarize recent work in our laboratory on the development of sensitive portable analytical systems for use in on-site detection of exposure to organophosphate (OP) pesticides and chemical nerve agents. These systems are based on various nanomaterials functioning as transducers; recognition agents or labels and various elelectrochemical/immunoassay techniques. The studied nanomaterials included functionalized carbon nanotubes (CNT), zirconia nanoparticles (NPs) and quantum dots (QDs). Three biomarkers e.g. the free OPs, metabolites of OPs and protein-OP adducts in biological matrices have been employed for biomonitoring of OP exposure with our developed system. It has been found that the nanomaterial-based portable analytical systems have high sensitivity for the detection of the biomarkers, which suggest that these technologies offer great promise for the rapid and on-site detection and evaluation of OP exposure.

  9. ELUCIDATING THE DIFFERENCES BETWEEN ONSITE AND OFFSITE SHIPMENT OF RADIOACTIVE MATERIALS

    SciTech Connect (OSTI)

    Loftin, B.; Watkins, R.

    2013-06-19

    Federal regulations stipulate how radioactive materials are transported within the United States. However, the Department of Energy, under Department of Energy Order, has the authority to operate, within the boundaries of their physical site, to other stipulations. In many cases the DOE sites have internal reviews for onsite transfers that rival reviews performed by the regulatory authorities for offsite shipments. Most of the differences are in the level or type of packaging that is required, but in some cases it may be in the amount and type of material that is allowed to be transferred. This paper will describe and discuss those differences and it will discuss ways to effectively align the onsite rules for transferring materials with those for offsite shipment.

  10. Voluntary Protection Program Onsite Review, Burns & McDonnell - Facility

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engineering Services, LLC - September 2015 | Department of Energy Burns & McDonnell - Facility Engineering Services, LLC - September 2015 Voluntary Protection Program Onsite Review, Burns & McDonnell - Facility Engineering Services, LLC - September 2015 September 2015 Recertification of FES as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Burns & McDonnell - Facility Engineering Services, LLC

  11. Safety evaluation for packaging (onsite) for the Pacific Northwest National Laboratory HEPA filter box

    SciTech Connect (OSTI)

    McCoy, J.C.

    1998-07-15

    This safety evaluation for packaging (SEP) evaluates and documents the safe onsite transport of eight high-efficiency particulate air (HEPA) filters in the Pacific Northwest National Laboratory HEPA Filter Box from the 300 Area of the Hanford Site to the Central Waste Complex and on to burial in the 200 West Area. Use of this SEP is authorized for 1 year from the date of release.

  12. Request for Comments on Including Onsite Renewable Energy Generation under Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Federal Energy Management Program (FEMP) released this Request for Comments on February 1, 2016, in an effort to obtain information about potential obstacles associated with the implementation of onsite renewable energy generation projects under the federal Energy Savings Performance Contract (ESPC) Authority, including potential issues with regard to project eligibility for the federal solar investment tax credit and the use of the ESPC ENABLE program for such projects.

  13. DOE/NNSA Participates in Large-Scale CTBT On-Site Inspection Exercise in

    National Nuclear Security Administration (NNSA)

    Jordan | National Nuclear Security Administration | (NNSA) Participates in Large-Scale CTBT On-Site Inspection Exercise in Jordan Friday, November 28, 2014 - 9:05am Experts from U.S. Department of Energy National Laboratories, including Sandia National Laboratories, Los Alamos National Laboratory, Lawrence Livermore National Laboratory, and Pacific Northwest National Laboratory, are participating in the Comprehensive Nuclear-Test-Ban Treaty (CTBT) Integrated Field Exercise 2014 (IFE14), a

  14. Portable gas chromatograph mass spectrometer for on-site chemical analyses

    DOE Patents [OSTI]

    Haas, Jeffrey S.; Bushman, John F.; Howard, Douglas E.; Wong, James L.; Eckels, Joel D.

    2002-01-01

    A portable, lightweight (approximately 25 kg) gas chromatograph mass spectrometer, including the entire vacuum system, can perform qualitative and quantitative analyses of all sample types in the field. The GC/MS has a conveniently configured layout of components for ease of serviceability and maintenance. The GC/MS system can be transported under operating or near-operating conditions (i.e., under vacuum and at elevated temperature) to reduce the downtime before samples can be analyzed on-site.

  15. Voluntary Protection Program Onsite Review, CH2M HILL Analytical Technical

    Office of Environmental Management (EM)

    Engineering Services, LLC - September 2015 | Department of Energy Burns & McDonnell - Facility Engineering Services, LLC - September 2015 Voluntary Protection Program Onsite Review, Burns & McDonnell - Facility Engineering Services, LLC - September 2015 September 2015 Recertification of FES as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Burns & McDonnell - Facility Engineering Services, LLC

  16. Providing Clean, Low-Cost, Onsite Distributed Generation at Very High Fuel Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Heat and Power Integrated with Burners for Packaged Boilers ADVANCED MANUFACTURING OFFICE Providing Clean, Low-Cost, Onsite Distributed Generation at Very High Fuel Efficiency This project integrated a gas-fred, simple-cycle 100 kilowatt (kW) microturbine (SCMT) with a new ultra-low nitrogen oxide (NO x ) gas-fred burner (ULNB) to develop a combined heat and power (CHP) assembly called the Boiler Burner Energy System Technology (BBEST). Introduction CHP systems can achieve signifcant

  17. ALTERNATIVES OF MACCS2 IN LANL DISPERSION ANALYSIS FOR ONSITE AND OFFSITE DOSES

    SciTech Connect (OSTI)

    Wang, John HC

    2012-05-01

    In modeling atmospheric dispersion to determine accidental release of radiological material, one of the common statistical analysis tools used at Los Alamos National Laboratory (LANL) is MELCOR Accident Consequence Code System, Version 2 (MACCS2). MACCS2, however, has some limitations and shortfalls for both onsite and offsite applications. Alternative computer codes, which could provide more realistic calculations, are being investigated for use at LANL. In the Yucca Mountain Project (YMP), the suitability of MACCS2 for the calculation of onsite worker doses was a concern; therefore, ARCON96 was chosen to replace MACCS2. YMP's use of ARCON96 provided results which clearly demonstrated the program's merit for onsite worker safety analyses in a wide range of complex configurations and scenarios. For offsite public exposures, the conservatism of MACCS2 on the treatment of turbulence phenomena at LANL is examined in this paper. The results show a factor of at least two conservatism in calculated public doses. The new EPA air quality model, AERMOD, which implements advanced meteorological turbulence calculations, is a good candidate for LANL applications to provide more confidence in the accuracy of offsite public dose projections.

  18. Plug-in electric vehicle market penetration and incentives: a...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Book Title Mitigation and Adaptation Strategies for Global Change Volume 20 Publisher Springer Keywords global vehicle sales, government incentive policies, plug-in electric...

  19. ELECTRIC CONTACT MEANS

    DOE Patents [OSTI]

    Grear, J.W. Jr.

    1959-03-10

    A switch adapted to maintain electrical connections under conditions of vibration or acceleration is described. According to the invention, thc switch includes a rotatable arm carrying a conductive bar arranged to close against two contacts spaced in the same plane. The firm and continuous engagement of the conductive bar with the contacts is acheived by utilizeing a spring located betwenn the vbar and athe a rem frzme and slidable mounting the bar in channel between two arms suspendef from the arm frame.

  20. Voluntary Protection Program Onsite Review, URS | CH2M Oak Ridge LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2015 | Department of Energy URS | CH2M Oak Ridge LLC - April 2015 Voluntary Protection Program Onsite Review, URS | CH2M Oak Ridge LLC - April 2015 April 2015 UCOR is admitted to the Department of Energy Voluntary Protection Program as a Star Participant. This report summarizes the results from the evaluation of URS | CH2M OAK RIDGE LLC (UCOR) in Oak Ridge, Tennessee during the period of April 14-23 2015, and provides the Associate Under Secretary for AU with the necessary information

  1. On-site demonstration procedure for solid-state fluorescent ballast

    SciTech Connect (OSTI)

    Verderber, R.; Morse, O.

    1980-09-01

    The report was presented to plant engineers and managers who were involved in an on-site demonstration of EETech solid-state ballasts for two 40-watt T12 fluorescent lamps. The report includes a brief review of the operating principles of solid-state fluorescent ballasts and the status of development achieved during the LBL program. The remainder of the test describes the techniques of managing and instrumenting a test area for assessing the performance of solid-state fluorescent ballasts at an occupied site.

  2. Fluid cooled electrical assembly

    DOE Patents [OSTI]

    Rinehart, Lawrence E.; Romero, Guillermo L.

    2007-02-06

    A heat producing, fluid cooled assembly that includes a housing made of liquid-impermeable material, which defines a fluid inlet and a fluid outlet and an opening. Also included is an electrical package having a set of semiconductor electrical devices supported on a substrate and the second major surface is a heat sink adapted to express heat generated from the electrical apparatus and wherein the second major surface defines a rim that is fit to the opening. Further, the housing is constructed so that as fluid travels from the fluid inlet to the fluid outlet it is constrained to flow past the opening thereby placing the fluid in contact with the heat sink.

  3. 2012 National Electricity Forum: February 8-9, 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 National Electricity Forum: February 8-9, 2012 2012 National Electricity Forum: February 8-9, 2012 January 4, 2012 - 11:28am Addthis The 2012 National Electricity Forum will be held on February 8 and 9, 2012, and is sponsored by the DOE Office of Electricity Delivery and Energy Reliability and the National Association of Regulatory Utility Commissioners (NARUC). Online registratin is now closed; participants are welcome to register onsite. A Leading Role The DOE is taking a leading role in

  4. Electric vehicles

    SciTech Connect (OSTI)

    Not Available

    1990-03-01

    Quiet, clean, and efficient, electric vehicles (EVs) may someday become a practical mode of transportation for the general public. Electric vehicles can provide many advantages for the nation's environment and energy supply because they run on electricity, which can be produced from many sources of energy such as coal, natural gas, uranium, and hydropower. These vehicles offer fuel versatility to the transportation sector, which depends almost solely on oil for its energy needs. Electric vehicles are any mode of transportation operated by a motor that receives electricity from a battery or fuel cell. EVs come in all shapes and sizes and may be used for different tasks. Some EVs are small and simple, such as golf carts and electric wheel chairs. Others are larger and more complex, such as automobile and vans. Some EVs, such as fork lifts, are used in industries. In this fact sheet, we will discuss mostly automobiles and vans. There are also variations on electric vehicles, such as hybrid vehicles and solar-powered vehicles. Hybrid vehicles use electricity as their primary source of energy, however, they also use a backup source of energy, such as gasoline, methanol or ethanol. Solar-powered vehicles are electric vehicles that use photovoltaic cells (cells that convert solar energy to electricity) rather than utility-supplied electricity to recharge the batteries. This paper discusses these concepts.

  5. Nuclear Test Scenarios for Discussion of On-Site Inspection Technologies

    SciTech Connect (OSTI)

    Sweeney, J J; Hawkins, W

    2009-03-13

    The purpose of the ISS OSI Invited Meeting being held in Vienna March 24-27, 2009 is to obtain a better understanding of the phenomenology of underground nuclear explosions for On-Site Inspection (OSI) purposes. In order to focus the technology discussions, we have developed two very general scenarios, or models, of underground nuclear test configurations and phenomena that will help us explore the application of OSI methodologies and techniques. The scenarios describe testing environments, operations, logistics, equipment, and facilities that might be used in conducting an underground nuclear test. One scenario involves emplacement of a nuclear device into a vertical borehole in an area with relatively flat terrain; the other involves emplacement within a tunnel (horizontally) in an area with mountainous terrain. Vertical borehole geometry The example for this scenario is an intermediate yield nuclear explosion carried out in a flat desert area. The ground was cleared and smoothed over a 200 X 200 m fenced area for operational support activities, access to the borehole, and in order to place a few structures to house diagnostics equipment and control functions. Power lines were provided for local electrical power. The vertical emplacement borehole was 2 m in diameter and bored to a depth of 350 m. The emplacement hole was lined with steel pipe in order to keep the hole open and to avoid cave-ins during emplacement of the nuclear device. Emplacement was above the local water table, and the top of the saturation zone is about 30 m below the bottom of the emplacement hole. The detonation point was at a depth of 340 m. All of the rock material removed while drilling the borehole was removed to another place. Diagnostics and control for the test were relatively simple: about 2 dozen high capacity coaxial cables feed from the down hole instruments to the surface and then about 100 m laterally to a diagnostics trailer. Two strong steel cables were used to emplace the

  6. Electric Vehicles

    ScienceCinema (OSTI)

    Ozpineci, Burak

    2014-07-23

    Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

  7. Electrical Engineer

    Broader source: Energy.gov [DOE]

    Transmission Field Services is responsible for field switching operation and maintenance of Bonneville Power Administration's high-voltage electrical transmission system to provide safe, reliable,...

  8. Electrical Safety

    Office of Environmental Management (EM)

    Handbook that was originally issued in 1998, and revised in 2004. DOE handbooks are ... the National Fire Protection Association (NFPA) 70, the National Electrical Code (NEC), ...

  9. Electric Vehicles

    SciTech Connect (OSTI)

    Ozpineci, Burak

    2014-05-02

    Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

  10. Safety analysis report for packaging (onsite) decontaminated equipment self-container

    SciTech Connect (OSTI)

    Boehnke, W.M.

    1998-09-29

    The purpose of this Safety Analysis Report for Packaging (SARP) is to demonstrate that specific decontaminated equipment can be safely used as its own self-container. As a Decontaminated Equipment Self-Container (also referred to as a self-container), no other packaging, such as a burial box, would be required to transport the equipment onsite. The self-container will consist of a piece of equipment or apparatus which has all readily removable interior contamination removed, all of its external openings sealed, and all external surfaces decontaminated to less than 2000 dpm/100 cm for gamma-emitting radionuclides and less than 220 dpm/100 CM2 for alpha-emitting radionuclides.

  11. Electric drive mechanism for vehicles

    SciTech Connect (OSTI)

    Bader, C.

    1983-06-21

    An electric drive mechanism is disclosed for vehicles, especially buses with overhead trolley routes, which routes are provided with relatively short interruptions in the overhead trolley. The drive mechanism includes a flywheel two externally excited electric motors which are adapted to be switched over from prime mover operation to generator operation, and which motors are effective as a ward-leonard drive during flywheel operation. The first electric motor is constructed for half of a maximum drive power and the second electric motor is likewise constructed for half or for square root 2/2 times the maximum drive power. Both electric motors are connected electrically in parallel during operation from the main electrical supply. The first and second motors are electrically connected in parallel during operation of the vehicle from the main electrical supply when a change-speed transmission is provided for connecting a drive shaft of one of the motors with driven vehicle wheels. A planetary gear transmission and a further transmission are provided for mechanically connecting the drive shaft of one of the motors with the second motor and with the flywheel.

  12. A Laser-Based Method for On-Site Analysis of UF6 at Enrichment Plants

    SciTech Connect (OSTI)

    Anheier, Norman C.; Cannon, Bret D.; Martinez, Alonzo; Barrett, Christopher A.; Taubman, Matthew S.; Anderson, Kevin K.; Smith, Leon E.

    2014-11-23

    The International Atomic Energy Agency’s (IAEA’s) long-term research and development plan calls for more cost-effective and efficient safeguard methods to detect and deter misuse of gaseous centrifuge enrichment plants (GCEPs). The IAEA’s current safeguards approaches at GCEPs are based on a combination of routine and random inspections that include environmental sampling and destructive assay (DA) sample collection from UF6 in-process material and selected cylinders. Samples are then shipped offsite for subsequent laboratory analysis. In this paper, a new DA sample collection and onsite analysis approach that could help to meet challenges in transportation and chain of custody for UF6 DA samples is introduced. This approach uses a handheld sampler concept and a Laser Ablation, Laser Absorbance Spectrometry (LAARS) analysis instrument, both currently under development at the Pacific Northwest National Laboratory. A LAARS analysis instrument could be temporarily or permanently deployed in the IAEA control room of the facility, in the IAEA data acquisition cabinet, for example. The handheld PNNL DA sampler design collects and stabilizes a much smaller DA sample mass compared to current sampling methods. The significantly lower uranium mass reduces the sample radioactivity and the stabilization approach diminishes the risk of uranium and hydrogen fluoride release. These attributes enable safe sample handling needed during onsite LAARS assay and may help ease shipping challenges for samples to be processed at the IAEA’s offsite laboratory. The LAARS and DA sampler implementation concepts will be described and preliminary technical viability results presented.

  13. Roles of electricity: Electric steelmaking

    SciTech Connect (OSTI)

    Burwell, C.C.

    1986-07-01

    Electric steel production from scrap metal continues to grow both in total quantity and in market share. The economics of electric-steel production in general, and of electric minimills in particular, seem clearly established. The trend towards electric steelmaking provides significant economic and competitive advantages for producers and important overall economic, environmental, and energy advantages for the United States at large. Conversion to electric steelmaking offers up to a 4-to-1 advantage in terms of the overall energy used to produce a ton of steel, and s similar savings in energy cost for the producer. The amount of old scrap used to produce a ton of steel has doubled since 1967 because of the use of electric furnaces.

  14. Adapting to Survive

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adapting to Survive Lesson on how climate and environment affect people in Alaska. Grade: ... of the land and the ways in which people adapted in that area. 3. To increase the ...

  15. Electric avenues

    SciTech Connect (OSTI)

    Stone, P.; Chang, A.

    1994-12-31

    Highly efficient electric drive technology developed originally for defense applications is being applied to the development of all electric shuttle buses for the San Jose International Airport. An innovative opportunity charging system using induction chargers will be incorporated to extend operation hours. The project, if successful, is expected to reduce pollution at the airport and generate jobs for displaced defense workers.

  16. Electric machine

    DOE Patents [OSTI]

    El-Refaie, Ayman Mohamed Fawzi; Reddy, Patel Bhageerath

    2012-07-17

    An interior permanent magnet electric machine is disclosed. The interior permanent magnet electric machine comprises a rotor comprising a plurality of radially placed magnets each having a proximal end and a distal end, wherein each magnet comprises a plurality of magnetic segments and at least one magnetic segment towards the distal end comprises a high resistivity magnetic material.

  17. Electrical connector

    DOE Patents [OSTI]

    Dilliner, Jennifer L.; Baker, Thomas M.; Akasam, Sivaprasad; Hoff, Brian D.

    2006-11-21

    An electrical connector includes a female component having one or more receptacles, a first test receptacle, and a second test receptacle. The electrical connector also includes a male component having one or more terminals configured to engage the one or more receptacles, a first test pin configured to engage the first test receptacle, and a second test pin configured to engage the second test receptacle. The first test receptacle is electrically connected to the second test receptacle, and at least one of the first test pin and the second test pin is shorter in length than the one or more terminals.

  18. Assessing the Benefits of On-Site Combined Heat and Power During...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On August 14, 2003, large portions of the Midwest and Northeast United States and Ontario, Canada, experienced an electric power outage. This study focused on identifying ...

  19. Electrical Safety

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Fig. 1-1. Flow down of Electrical AHJ and worker responsibility. 3 DOE-HDBK-1092-2013 2.0 ... When equipment contains storage batteries, workers should be protected from the various ...

  20. Electric generator

    DOE Patents [OSTI]

    Foster, Jr., John S.; Wilson, James R.; McDonald, Jr., Charles A.

    1983-01-01

    1. In an electrical energy generator, the combination comprising a first elongated annular electrical current conductor having at least one bare surface extending longitudinally and facing radially inwards therein, a second elongated annular electrical current conductor disposed coaxially within said first conductor and having an outer bare surface area extending longitudinally and facing said bare surface of said first conductor, the contiguous coaxial areas of said first and second conductors defining an inductive element, means for applying an electrical current to at least one of said conductors for generating a magnetic field encompassing said inductive element, and explosive charge means disposed concentrically with respect to said conductors including at least the area of said inductive element, said explosive charge means including means disposed to initiate an explosive wave front in said explosive advancing longitudinally along said inductive element, said wave front being effective to progressively deform at least one of said conductors to bring said bare surfaces thereof into electrically conductive contact to progressively reduce the inductance of the inductive element defined by said conductors and transferring explosive energy to said magnetic field effective to generate an electrical potential between undeformed portions of said conductors ahead of said explosive wave front.

  1. Relocation of on-site spoils pile materials at the Linde Fusrap Site

    SciTech Connect (OSTI)

    Schwippert, M.T.; Boyle, J.D.; Bousquet, S.M.

    2007-07-01

    During the 1940's, the Linde Division of Union Carbide used portions of their property in Tonawanda, New York for processing uranium ores under Federal Manhattan Engineering District (MED) contracts. These activities resulted in radiological contamination on portions of the property. The radionuclides of concern at the site are Radium, Thorium, and Uranium. The site is currently owned and operated by Praxair Inc., an industrial gas company. The U.S. Army Corps of Engineers (USACE) issued a Record of Decision to remediate the radiologically-contaminated materials associated with MED activities in March 2000 under the authority of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The selected remedy is fully protective of human health and the environment and complies with Federal and State requirements that are legally applicable or relevant and appropriate and meets community commitments. The USACE - Buffalo District has been executing remedial activities at the site and has successfully addressed many challenges in a safe and cost effective manner through effective coordination, project management, and partnering with stakeholders. These efforts supported the successful relocation of approximately 29,000 cubic yards of stockpiled material (soils, concrete, steel, asphalt and miscellaneous non-soil) that had been generated by the property owner as a result of ongoing development of the facility. Relocation of the material was necessary to allow safe access to the surface and subsurface soils beneath the pile for sampling and analysis. During relocation operations, materials were evaluated for the presence of radiological contamination. The vast majority of material was relocated onsite and remained the property owner's responsibility. A small portion of the material required off-site disposal at a permitted disposal facility due to radiological contamination that exceeded site criteria. This paper presents details associated with the successful

  2. Electrically controlled polymeric gel actuators

    DOE Patents [OSTI]

    Adolf, D.B.; Shahinpoor, M.; Segalman, D.J.; Witkowski, W.R.

    1993-10-05

    Electrically controlled polymeric gel actuators or synthetic muscles are described capable of undergoing substantial expansion and contraction when subjected to changing pH environments, temperature, or solvent. The actuators employ compliant containers for the gels and their solvents. The gels employed may be cylindrical electromechanical gel fibers such as polyacrylamide fibers or a mixture of poly vinyl alcohol-polyacrylic acid arranged in a parallel aggregate and contained in an electrolytic solvent bath such as salt water. The invention includes smart, electrically activated devices exploiting this phenomenon. These devices are capable of being manipulated via active computer control as large displacement actuators for use in adaptive structure such as robots. 11 figures.

  3. Electrically controlled polymeric gel actuators

    DOE Patents [OSTI]

    Adolf, Douglas B.; Shahinpoor, Mohsen; Segalman, Daniel J.; Witkowski, Walter R.

    1993-01-01

    Electrically controlled polymeric gel actuators or synthetic muscles capable of undergoing substantial expansion and contraction when subjected to changing pH environments, temperature, or solvent. The actuators employ compliant containers for the gels and their solvents. The gels employed may be cylindrical electromechanical gel fibers such as polyacrylamide fibers or a mixture of poly vinyl alcohol-polyacrylic acid arranged in a parallel aggregate and contained in an electrolytic solvent bath such as salt water. The invention includes smart, electrically activated devices exploiting this phenomenon. These devices are capable of being manipulated via active computer control as large displacement actuators for use in adaptive structure such as robots.

  4. PORTSMOUTH ON-SITE DISPOSAL CELL HIGH DENSITY POLYETHYLENE GEOMEMBRANE LONGEVITY

    SciTech Connect (OSTI)

    Phifer, M.

    2012-01-31

    It is anticipated that high density polyethylene (HDPE) geomembranes will be utilized within the liner and closure cap of the proposed On-Site Disposal Cell (OSDC) at the Portsmouth Gaseous Diffusion Plant. The likely longevity (i.e. service life) of HDPE geomembranes in OSDC service is evaluated within the following sections of this report: (1) Section 2.0 provides an overview of HDPE geomembranes, (2) Section 3.0 outlines potential HDPE geomembranes degradation mechanisms, (3) Section 4.0 evaluates the applicability of HDPE geomembrane degradation mechanisms to the Portsmouth OSDC, (4) Section 5.0 provides a discussion of the current state of knowledge relative to the longevity (service life) of HDPE geomembranes, including the relation of this knowledge to the Portsmouth OSDC, and (5) Section 6.0 provides summary and conclusions relative to the anticipated service life of HDPE geomembranes in OSDC service. Based upon this evaluation it is anticipated that the service life of HDPE geomembranes in OSDC service would be significantly greater than the 200 year service life assumed for the OSDC closure cap and liner HDPE geomembranes. That is, a 200 year OSDC HDPE geomembrane service life is considered a conservative assumption.

  5. A C. elegans-based foam for rapid on-site detection of residual live virus.

    SciTech Connect (OSTI)

    Negrete, Oscar A.; Branda, Catherine; Hardesty, Jasper O. E.; Tucker, Mark David; Kaiser, Julia N.; Kozina, Carol L.; Chirica, Gabriela S.

    2012-02-01

    In the response to and recovery from a critical homeland security event involving deliberate or accidental release of biological agents, initial decontamination efforts are necessarily followed by tests for the presence of residual live virus or bacteria. Such 'clearance sampling' should be rapid and accurate, to inform decision makers as they take appropriate action to ensure the safety of the public and of operational personnel. However, the current protocol for clearance sampling is extremely time-intensive and costly, and requires significant amounts of laboratory space and capacity. Detection of residual live virus is particularly problematic and time-consuming, as it requires evaluation of replication potential within a eukaryotic host such as chicken embryos. The intention of this project was to develop a new method for clearance sampling, by leveraging Sandia's expertise in the biological and material sciences in order to create a C. elegans-based foam that could be applied directly to the entire contaminated area for quick and accurate detection of any and all residual live virus by means of a fluorescent signal. Such a novel technology for rapid, on-site detection of live virus would greatly interest the DHS, DoD, and EPA, and hold broad commercial potential, especially with regard to the transportation industry.

  6. Testing in support of on-site storage of residues in the Pipe Overpack Container

    SciTech Connect (OSTI)

    Ammerman, D.J.; Bobbe, J.G.; Arviso, M.

    1997-02-01

    The disposition of the large back-log of plutonium residues at the Rocky Flats Environmental Technology Site (Rocky Flats) will require interim storage and subsequent shipment to a waste repository. Current plans call for disposal at the Waste Isolation Pilot Plant (WIPP) and the transportation to WIPP in the TRUPACT-II. The transportation phase will require the residues to be packaged in a container that is more robust than a standard 55-gallon waste drum. Rocky Flats has designed the Pipe Overpack Container to meet this need. It is desirable to use this same waste packaging for interim on-site storage in non-hardened buildings. To meet the safety concerns for this storage the Pipe Overpack Container has been subjected to a series of tests at Sandia National Laboratories in Albuquerque, New Mexico. In addition to the tests required to qualify the Pipe Overpack Container as a waste container for shipment in the TRUPACT-II several tests were performed solely for the purpose of qualifying the container for interim storage. This report will describe these tests and the packages response to the tests. 12 figs., 3 tabs.

  7. Table A19. Components of Total Electricity Demand by Census Region and

    U.S. Energy Information Administration (EIA) Indexed Site

    Components of Total Electricity Demand by Census Region and" " Economic Characteristics of the Establishment, 1991" " (Estimates in Million Kilowatthours)" " "," "," "," ","Sales/"," ","RSE" " "," ","Transfers","Onsite","Transfers"," ","Row" "Economic

  8. Table A26. Components of Total Electricity Demand by Census Region, Census Di

    U.S. Energy Information Administration (EIA) Indexed Site

    Components of Total Electricity Demand by Census Region, Census Division, and" " Economic Characteristics of the Establishment, 1994" " (Estimates in Million Kilowatthours)" " "," "," "," ","Sales/"," ","RSE" " "," ","Transfers","Onsite","Transfers"," ","Row" "Economic

  9. Adaptive Energy Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Control of a Flexible, Adaptive Energy Grid "%"&%'&"&()*+%,-.-"(&*"0.-"+.-1&.,2-"+2&01&"%"&3.-,.-"+%.4&"&5.67822& 9"-+%&3.(,"14&:.-&+82&;%+2&+"+2'&<2,"-+(2+&.:&2-...

  10. Safety evaluation for packaging (onsite) for the concrete-shielded RH TRU drum for the 327 Postirradiation Testing Laboratory

    SciTech Connect (OSTI)

    Smith, R.J.

    1998-03-31

    This safety evaluation for packaging authorizes onsite transport of Type B quantities of radioactive material in the Concrete Shielded Remote-Handled Transuranic Waste (RH TRU) Drum per HNF-PRO-154, Responsibilities and Procedures for all Hazardous Material Shipments. The drum will be used for transport of 327 Building legacy waste from the 300 Area to a solid waste storage facility on the Hanford Site.

  11. Safety evaluation for packaging (onsite) for concrete-shielded RHTRU waste drum for the 327 postirradiation testing laboratory

    SciTech Connect (OSTI)

    Adkins, H.E.

    1996-10-29

    This safety evaluation for packaging authorizes onsite transport of Type B quantities of radioactive material in the Concrete- Shielded Remote-Handled Transuranic Waste (RH TRU) Drum per WHC-CM-2-14, Hazardous Material Packaging and Shipping. The drum will be used for transport of 327 Building legacy waste from the 300 Area to the Transuranic Waste Storage and Assay Facility in the 200 West Area and on to a Solid Waste Storage Facility, also in the 200 Area.

  12. A High-Temperature Fuel Cell to Provide On-Site Process Reducing Gas, Clean Power, and Heat

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Heat, Hydrogen, and Power System A High-Temperature Fuel Cell to Provide On-Site Process Reducing Gas, Clean Power, and Heat Introduction In order for metal products to have desired properties, most metal is thermally processed at a high temperature one or more times under a controlled atmosphere. Many different thermal operations are used including oxide reduction, annealing, brazing, sintering, and carburizing. A mixture of hydrogen and nitrogen gas often provides a reducing

  13. Demonstration of an on-site PAFC cogeneration system with waste heat utilization by a new gas absorption chiller

    SciTech Connect (OSTI)

    Urata, Tatsuo

    1996-12-31

    Analysis and cost reduction of fuel cells is being promoted to achieve commercial on-site phosphoric acid fuel cells (on-site FC). However, for such cells to be effectively utilized, a cogeneration system designed to use the heat generated must be developed at low cost. Room heating and hot-water supply are the most simple and efficient uses of the waste heat of fuel cells. However, due to the short room-heating period of about 4 months in most areas in Japan, the sites having demand for waste heat of fuel cells throughout the year will be limited to hotels and hospitals Tokyo Gas has therefore been developing an on-site FC and the technology to utilize tile waste heat of fuel cells for room cooling by means of an absorption refrigerator. The paper describes the results of fuel cell cogeneration tests conducted on a double effect gas absorption chiller heater with auxiliary waste heat recovery (WGAR) that Tokyo Gas developed in its Energy Technology Research Laboratory.

  14. Electrically powered hand tool

    DOE Patents [OSTI]

    Myers, Kurt S.; Reed, Teddy R.

    2007-01-16

    An electrically powered hand tool is described and which includes a three phase electrical motor having a plurality of poles; an electrical motor drive electrically coupled with the three phase electrical motor; and a source of electrical power which is converted to greater than about 208 volts three-phase and which is electrically coupled with the electrical motor drive.

  15. Adaptive Sampling Proxy Application

    Energy Science and Technology Software Center (OSTI)

    2012-10-22

    ASPA is an implementation of an adaptive sampling algorithm [1-3], which is used to reduce the computational expense of computer simulations that couple disparate physical scales. The purpose of ASPA is to encapsulate the algorithms required for adaptive sampling independently from any specific application, so that alternative algorithms and programming models for exascale computers can be investigated more easily.

  16. Recovery Act:Direct Confirmation of Commercial Geothermal Resources in Colorado Using Remoter Sensing and On-Site Exploration, Testing and Analysis

    Broader source: Energy.gov [DOE]

    Recovery Act:Direct Confirmation of Commercial Geothermal Resources in Colorado Using Remoter Sensing and On-Site Exploration, Testing and Analysis presentation at the April 2013 peer review meeting held in Denver, Colorado.

  17. Power supply system for heat and electricity

    SciTech Connect (OSTI)

    Hafner, G.; Finger, H.; Lenz, H.

    1985-03-05

    A power supply system for generating at least one of heat and electricity which includes a number of statically and functionally independent units adapted to generate at least one of heat and electricity which enable a maximum utilization of primary energy. For decentralized power supply over short and low loss supply lines the individual units are constructed as stackable modules. By exchanging or adding one or more modules, it is possible to adapt the flexibility of the power supply system to changes in demand for the energy thereby providing a practical approach to the utilization of waste heat for energy conservation purposes.

  18. On-site Destruction of Radioactive Oily Wastes Using Adsorption Coupled with Electrochemical Regeneration - 12221

    SciTech Connect (OSTI)

    Brown, N.W.; Wickenden, D.A.; Roberts, E.P.L.

    2012-07-01

    Arvia{sup R}, working with Magnox Ltd, has developed the technology of adsorption coupled with electrochemical regeneration for the degradation of orphan radioactive oil wastes. The process results in the complete destruction of the organic phase where the radioactivity is transferred to liquid and solid secondary wastes that can then be processed using existing authorised on-site waste-treatment facilities.. Following on from successful laboratory and pilot scale trials, a full scale, site based demonstrator unit was commissioned at the Magnox Trawsfynydd decommissioning site to destroy 10 l of LLW and ILW radioactive oils. Over 99% of the emulsified oil was removed and destroyed with the majority of activity (80 - 90%) being transferred to the aqueous phase. Secondary wastes were disposed of via existing routes with the majority being disposed of via the sites active effluent treatment plant. The regeneration energy required to destroy a litre of oil was 42.5 kWh/l oil. This on-site treatment approach eliminates the risks and cost associated with transporting the active waste oils off site for incineration or other treatment. The Arvia{sup R} process of adsorption coupled with electrochemical regeneration has successfully demonstrated the removal and destruction of LLW and ILW radioactive oils on a nuclear site. Over 99.9% of the emulsified oil was removed, with the majority of the radioactive species transferred to the aqueous, supernate, phase (typically 80 - 90 %). The exception to this is Cs-137 which appears to be more evenly distributed, with 43% associated with the liquid phase and 33 % with the Nyex, the remainder associated with the electrode bed. The situation with Plutonium may be similar, but this requires confirmation, hence further work is underway to understand the full nature of the electrode bed radioactive burden and its distribution within the body of the electrodes. - Tritium gaseous discharges were negligible; hence no off-gas treatment

  19. Environmental Assessment and Finding of No Significant Impact: On-Site Treatment of Low Level Mixed Waste

    SciTech Connect (OSTI)

    N /A

    1999-03-22

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1292) to evaluate the proposed treatment of low level mixed waste (LLMW) at the Rocky Flats Environmental Technology Site (Site). The purpose of the action is to treat LLMW in order to meet the Land Disposal Restrictions specified by the Resource Conservation and Recovery Act and the waste acceptance criteria of the planned disposal site(s). Approximately 17,000 cubic meters (m{sup 3}) of LLMW are currently stored at the Site. Another 65,000 m{sup 3}of LLMW are likely to be generated by Site closure activities (a total of 82,000 m{sup 3} of LLMW). About 35,000 m{sup 3} can be directly disposed of off-site without treatment, and most of the remaining 47,000 m{sup 3} of LLMW can be treated at off-site treatment, storage, and disposal facilities. However, some LLMW will require treatment on-site, either because it does not meet shipping requirements or because off-site treatment is not available for these particular types of LLMW. Currently, this LLMW is stored at the Site pending the development and implementation of effective treatment processes. The Site needs to treat this LLMW on-site prior to shipment to off-site disposal facilities, in order to meet the DOE long-term objective of clean up and closure of the Site. All on-site treatment of LLMW would comply with applicable Federal and State laws designed to protect public health and safety and to enhance protection of the environment. The EA describes and analyzes the environmental effects of the proposed action (using ten mobile treatment processes to treat waste on-site), and the alternatives of treating waste onsite (using two fixed treatment processes), and of taking no action. The EA was the subject of a public comment period from February 3 to 24, 1999. No written or other comments regarding the EA were received.

  20. Climate Change Adaptation Planning

    Broader source: Energy.gov [DOE]

    This course provides an introduction to planning for climate change impacts, with examples of tribes that have been going through the adaptation planning process. The course is intended for tribal...

  1. Leak test adapter for containers

    DOE Patents [OSTI]

    Hallett, Brian H.; Hartley, Michael S.

    1996-01-01

    An adapter is provided for facilitating the charging of containers and leak testing penetration areas. The adapter comprises an adapter body and stem which are secured to the container's penetration areas. The container is then pressurized with a tracer gas. Manipulating the adapter stem installs a penetration plug allowing the adapter to be removed and the penetration to be leak tested with a mass spectrometer. Additionally, a method is provided for using the adapter.

  2. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Methodology and Documentation General The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics,...

  3. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Information and Staff The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S....

  4. ALL-PATHWAYS DOSE ANALYSIS FOR THE PORTSMOUTH ON-SITE WASTE DISPOSAL FACILITY

    SciTech Connect (OSTI)

    Smith, F.; Phifer, M.

    2014-04-10

    A Portsmouth On-Site Waste Disposal Facility (OSWDF) All-Pathways analysis has been conducted that considers the radiological impacts to a resident farmer. It is assumed that the resident farmer utilizes a farm pond contaminated by the OSWDF to irrigate a garden and pasture and water livestock from which food for the resident farmer is obtained, and that the farmer utilizes groundwater from the Berea sandstone aquifer for domestic purposes (i.e. drinking water and showering). As described by FBP 2014b the Hydrologic Evaluation of Landfill Performance (HELP) model (Schroeder et al. 1994) and the Surface Transport Over Multiple Phases (STOMP) model (White and Oostrom 2000, 2006) were used to model the flow and transport from the OSWDF to the Points of Assessment (POAs) associated with the 680-ft elevation sandstone layer (680 SSL) and the Berea sandstone aquifer. From this modeling the activity concentrations radionuclides were projected over time at the POAs. The activity concentrations were utilized as input to a GoldSimTM (GTG 2010) dose model, described herein, in order to project the dose to a resident farmer over time. A base case and five sensitivity cases were analyzed. The sensitivity cases included an evaluation of the impacts of using a conservative inventory, an uncased well to the Berea sandstone aquifer, a low waste zone uranium distribution coefficient (Kd), different transfer factors, and reference person exposure parameters (i.e. at 95 percentile). The maximum base case dose within the 1,000 year assessment period was projected to be 1.5E-14 mrem/yr, and the maximum base case dose at any time less than 10,000 years was projected to be 0.002 mrem/yr. The maximum projected dose of any sensitivity case was approximately 2.6 mrem/yr associated with the use of an uncased well to the Berea sandstone aquifer. This sensitivity case is considered very unlikely because it assumes leakage from the location of greatest concentration in the 680 SSL in to the

  5. Electrical receptacle

    DOE Patents [OSTI]

    Leong, Robert

    1993-01-01

    The invention is a receptacle for a three prong electrical plug which has either a tubular or U-shaped grounding prong. The inventive receptacle has a grounding prong socket which is sufficiently spacious to prevent the socket from significantly stretching when a larger, U-shaped grounding prong is inserted into the socket, and having two ridges to allow a snug fit when a smaller tubular shape grounding prong is inserted into the socket. The two ridges are made to prevent the socket from expanding when either the U-shaped grounding prong or the tubular grounding prong is inserted.

  6. Electrical receptacle

    DOE Patents [OSTI]

    Leong, R.

    1993-06-22

    The invention is a receptacle for a three prong electrical plug which has either a tubular or U-shaped grounding prong. The inventive receptacle has a grounding prong socket which is sufficiently spacious to prevent the socket from significantly stretching when a larger, U-shaped grounding prong is inserted into the socket, and having two ridges to allow a snug fit when a smaller tubular shape grounding prong is inserted into the socket. The two ridges are made to prevent the socket from expanding when either the U-shaped grounding prong or the tubular grounding prong is inserted.

  7. Electrical machine

    DOE Patents [OSTI]

    De Bock, Hendrik Pieter Jacobus; Alexander, James Pellegrino; El-Refaie, Ayman Mohamed Fawzi; Gerstler, William Dwight; Shah, Manoj Ramprasad; Shen, Xiaochun

    2016-06-21

    An apparatus, such as an electrical machine, is provided. The apparatus can include a rotor defining a rotor bore and a conduit disposed in and extending axially along the rotor bore. The conduit can have an annular conduit body defining a plurality of orifices disposed axially along the conduit and extending through the conduit body. The rotor can have an inner wall that at least partially defines the rotor bore. The orifices can extend through the conduit body along respective orifice directions, and the rotor and conduit can be configured to provide a line of sight along the orifice direction from the respective orifices to the inner wall.

  8. US DOE-EM On-Site Disposal Cell Working Group - Fostering Communication On Performance Assessment Challenges

    SciTech Connect (OSTI)

    Seitz, Roger R.; Suttora, Linda C.; Phifer, Mark

    2014-03-01

    On-site disposal cells are in use and being considered at several U.S. Department of Energy (USDOE) sites as the final disposition for large amounts of waste associated with cleanup of contaminated areas and facilities. These facilities are typically developed with regulatory oversight from States and/or the US Environmental Protection Agency (USEPA) in addition to USDOE. The facilities are developed to meet design standards for disposal of hazardous waste as well as the USDOE performance based standards for disposal of radioactive waste. The involvement of multiple and different regulators for facilities across separate sites has resulted in some differences in expectations for performance assessments and risk assessments (PA/RA) that are developed for the disposal facilities. The USDOE-EM Office of Site Restoration formed a working group to foster improved communication and sharing of information for personnel associated with these Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) disposal cells and work towards more consistent assumptions, as appropriate, for technical and policy considerations related to performance and risk assessments in support of a Record of Decision and Disposal Authorization Statement. The working group holds teleconferences, as needed, focusing on specific topics of interest. The topics addressed to date include an assessment of the assumptions used for performance assessments and risk assessments (PA/RAs) for on-site disposal cells, requirements and assumptions related to assessment of inadvertent intrusion, DOE Manual 435.1-1 requirements, and approaches for consideration of the long-term performance of liners and covers in the context of PAs. The working group has improved communication among the staff and oversight personnel responsible for onsite disposal cells and has provided a forum to identify and resolve common concerns.

  9. Study on neutronic of very small Pb - Bi cooled no-onsite refueling nuclear power reactor (VSPINNOR)

    SciTech Connect (OSTI)

    Arianto, Fajar; Su'ud, Zaki; Zuhair

    2014-09-30

    A conceptual design study on Very Small Pb-Bi No-Onsite Refueling Cooled Nuclear Reactor (VSPINNOR) with Uranium nitride fuel using MCNPX program has been performed. In this design the reactor core is divided into three regions with different enrichment. At the center of the core is laid fuel without enrichment (internal blanket). While for the outer region using fuel enrichment variations. VSPINNOR fast reactor was operated for 10 years without refueling. Neutronic analysis shows optimized result of VSPINNOR has a core of 50 cm radius and 100 cm height with 300 MWth thermal power output at 60% fuel fraction that can be operated 18 years without refueling or fuel shuffling.

  10. Modeling Electric Vehicle Benefits Connected to Smart Grids

    SciTech Connect (OSTI)

    Stadler, Michael; Marnay, Chris; Mendes, Goncalo; Kloess, Maximillian; Cardoso, Goncalo; Mégel, Olivier; Siddiqui, Afzal

    2011-07-01

    Connecting electric storage technologies to smartgrids will have substantial implications in building energy systems. Local storage will enable demand response. Mobile storage devices in electric vehicles (EVs) are in direct competition with conventional stationary sources at the building. EVs will change the financial as well as environmental attractiveness of on-site generation (e.g. PV, or fuel cells). In order to examine the impact of EVs on building energy costs and CO2 emissions in 2020, a distributed-energy-resources adoption problem is formulated as a mixed-integer linear program with minimization of annual building energy costs or CO2 emissions. The mixed-integer linear program is applied to a set of 139 different commercial buildings in California and example results as well as the aggregated economic and environmental benefits are reported. The research shows that considering second life of EV batteries might be very beneficial for commercial buildings.