Powered by Deep Web Technologies
Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

PRO-DAIRY Alert and Action Statement Water use reporting required for New York State dairy farms that use large quantities of water.  

E-Print Network [OSTI]

1 PRO-DAIRY Alert and Action Statement Water use reporting required for New York State dairy farms to have plentiful water, the reporting of water usage provides NYSDEC information to manage the state that use large quantities of water. All dairy farms should be aware of this requirement, especially those

Walter, M.Todd

2

Level 1: Incidental crane operator`s and incidental rigger`s manual. Revision  

SciTech Connect (OSTI)

This document is a safety manual for incidental crane operators and incidental riggers. The information contained in this manual includes: Terminology and definitions, safety orientation, general operating procedures, high-consequence/high value lifts, sling safety, basic rules of hitching and rigging, and common errors in hitching.

Neubauer, P. [ed.

1992-11-01T23:59:59.000Z

3

QUANTITY SEX AGE WEIGHT WITH: VENDOR  

E-Print Network [OSTI]

QUANTITY SEX AGE WEIGHT NUMBER/ CAGE WITH: VENDOR: REFERENCE No: PO No: FACILITY: RECEIVED ON PLACED BY: DATE: SUGGESTED VENDOR: AUP No: USER's PHONE No: USER's NAME: USER's EMAIL: ANIMAL REQUEST

Arnold, Jonathan

4

Average transverse momentum quantities approaching the lightfront  

E-Print Network [OSTI]

In this contribution to Light Cone 2014, three average transverse momentum quantities are discussed: the Sivers shift, the dijet imbalance, and the $p_T$ broadening. The definitions of these quantities involve integrals over all transverse momenta that are overly sensitive to the region of large transverse momenta, which conveys little information about the transverse momentum distributions of quarks and gluons inside hadrons. TMD factorization naturally suggests alternative definitions of such integrated quantities, using Bessel-weighting and rapidity cut-offs, with the conventional definitions as limiting cases. The regularized quantities are given in terms of integrals over the TMDs of interest that are well-defined and moreover have the advantage of being amenable to lattice evaluations.

Daniel Boer

2014-09-29T23:59:59.000Z

5

Statistical Ensembles with Fluctuating Extensive Quantities  

E-Print Network [OSTI]

We suggest an extension of the standard concept of statistical ensembles. Namely, we introduce a class of ensembles with extensive quantities fluctuating according to an externally given distribution. As an example the influence of energy fluctuations on multiplicity fluctuations in limited segments of momentum space for a classical ultra-relativistic gas is considered.

M. I. Gorenstein; M. Hauer

2008-01-28T23:59:59.000Z

6

Unit Conversion Factors Quantity Equivalent Values  

E-Print Network [OSTI]

Unit Conversion Factors Quantity Equivalent Values Mass 1 kg = 1000 g = 0.001 metric ton = 2·R 10.73 psia·ft3 lbmol·R 62.36 liter·torr mol·K 0.7302 ft3·atm lbmol·R Temperature Conversions: T

Ashurst, W. Robert

7

IMPLEMENTATION OF THE UNITED STATES NATIONAL PLAN OF ACTION FOR REDUCING THE INCIDENTAL CATCH OF SEABIRDS  

E-Print Network [OSTI]

-Stevens Fishery Conservation and Management Act, the Endangered Species Act, the Migratory Bird Treaty Act

8

Effects of Tasks and Glosses on L2 Incidental Vocabulary Learning: Meta-analyses  

E-Print Network [OSTI]

This study investigated the effects of output stimulus tasks and glosses on L2 incidental vocabulary learning. Two meta-analytic studies were conducted. The first was intended to provide a systematic statistical synthesis of the effects of output...

Huang, Shu-Fen

2012-10-19T23:59:59.000Z

9

West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental...  

Office of Environmental Management (EM)

435.1, provides that the DOE may determine that certain waste from reprocessing spent nuclear fuel is waste incidental to reprocessing, is not high-level waste and may be...

10

Corrective Action  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Corrective Action Individual Permit: Corrective Action Certifications If confirmation monitoring sample results demonstrate that one or more TALs are exceeded at a Site, the...

11

RESEARCH ARTICLE Carbon quantity defines productivity while its quality defines  

E-Print Network [OSTI]

RESEARCH ARTICLE Carbon quantity defines productivity while its quality defines community that dissolved organic carbon (DOC) quantity and quality differently influence bacterioplankton. The ponds were production, abundance, biomass were highest in mid-summer and correlated positively with the concentration

Vincent, Warwick F.

12

Category 3 threshold quantities for hazard categorization of nonreactor facilities  

SciTech Connect (OSTI)

This document provides the information necessary to determine Hazard Category 3 threshold quantities for those isotopes of interest not listed in WHC-CM-4-46, Section 4, Table 1.''Threshold Quantities.''

Mandigo, R.L.

1996-02-13T23:59:59.000Z

13

Coordinating production quantities and demand forecasts through penalty schemes  

E-Print Network [OSTI]

Coordinating production quantities and demand forecasts through penalty schemes MURUVVET CELIKBAS1 departments which enable organizations to match demand forecasts with production quantities. This research problem where demand is uncertain and the marketing de- partment provides a forecast to manufacturing

Swaminathan, Jayashankar M.

14

RESEARCH ARTICLE Evidence for weed quantity as the major information  

E-Print Network [OSTI]

RESEARCH ARTICLE Evidence for weed quantity as the major information gathered by organic farmers quantity was the information most frequently col- lected by organic farmers both for short- and long, as weeds are one of the main limiting factors of yield (Brberi 2002). Weed biomass, density, diversity

Paris-Sud XI, Universit de

15

Some Intensive and Extensive Quantities in High-Energy Collisions  

E-Print Network [OSTI]

We review the evolution of some statistical and thermodynamical quantities measured in difference sizes of high-energy collisions at different energies. We differentiate between intensive and extensive quantities and discuss the importance of their distinguishability in characterizing possible critical phenomena of nuclear collisions at various energies with different initial conditions.

A. Tawfik

2013-10-02T23:59:59.000Z

16

Kinematic quantities of finite elastic and plastic deformation  

E-Print Network [OSTI]

Kinematic quantities for finite elastic and plastic deformations are defined via an approach that does not rely on auxiliary elements like reference frame and reference configuration, and that gives account of the inertial-noninertial aspects explicitly. These features are achieved by working on Galilean spacetime directly. The quantity expressing elastic deformations is introduced according to its expected role: to measure how different the current metric is from the relaxed/stressless metric. Further, the plastic kinematic quantity is the change rate of the stressless metric. The properties of both are analyzed, and their relationship to frequently used elastic and plastic kinematic quantities is discussed. One important result is that no objective elastic or plastic quantities can be defined from deformation gradient.

T. Flp; P. Vn

2012-03-05T23:59:59.000Z

17

Rangeland Risk Management for Texans: Forage Quality and Quantity  

E-Print Network [OSTI]

This publication focuses on ways of recognizing and correcting problems with both forage quality and forage quantity. Both are important, and both can be the reason for poor animal performance....

Lyons, Robert K.

2000-11-01T23:59:59.000Z

18

On the Representation of Physical Quantities in Natural Language Text  

E-Print Network [OSTI]

On the Representation of Physical Quantities in Natural Language Text Sven E. Kuehne (skuehne processes from natural language text. In an earlier analysis (Kuehne & Forbus, 2002) we presented a scheme

Forbus, Kenneth D.

19

Integrated quality and quantity modeling of a production line  

E-Print Network [OSTI]

The interaction of quantity and quality performance in a factory is clearly of great economic importance. However, there is very little quantitative analytical literature in this area. This thesis is an essential early ...

Kim, Jongyoon, 1974-

2005-01-01T23:59:59.000Z

20

Incidental learning as a function of specificity of instructions and complexity of task  

E-Print Network [OSTI]

were discussed, but the studies showed conflicting results. These variables were number of presentations of the task, exposure time to the task materials, serial position effects, meaningfulness of stimuli, isolation effect, and motivation. In order... the intentional task would also increase, and accordingly the amount of incidental learning would decrease. The experiment proposed to measure the effect of varying the complexity of task, in order to control directly the amount of attention the S applies...

Baskin, Carol Scarboro

1971-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

NDHA REQUIREMENTS FOR FCNS 320 Quantity Food Production  

E-Print Network [OSTI]

of practical food service work experience. CERTIFICATION & TB TEST GUIDELINES Food Sanitation CertificateNDHA REQUIREMENTS FOR FCNS 320 ­ Quantity Food Production OVERVIEW State Of Illinois Food) Skin Test Verification of 100 Hours Completed Work Experience in Food Production Verification

Kostic, Milivoje M.

22

TC1 Parts List Quantity Size Description **Possible Vendor  

E-Print Network [OSTI]

TC1 Parts List Quantity Size Description **Possible Vendor Source 1 3.5"od x 20" Clear Acrylic tube stripped Radio Shack Other parts as required. **This is just a list of possible vendor sources. Please note, some vendors have minimums for orders. #12;

Barrash, Warren

23

Action Items  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartment of EnergyAbout Us » FAQsUCNIOF ENERGYU.S.-BrazilACTION

24

BIOLOGICAL OPINION ON ISSUANCE OF INCIDENTAL HARASSMENT AUTHORIZATIONS FOR OIL AND GAS EXPLORATION ACTIVITIES IN THE CHUKCHI AND BEAUFORT SEAS IN 2010  

E-Print Network [OSTI]

#12;BIOLOGICAL OPINION ON ISSUANCE OF INCIDENTAL HARASSMENT AUTHORIZATIONS FOR OIL AND GAS..............................................................................................................84 i #12;BIOLOGICAL OPINION ON ISSUANCE OF INCIDENTAL HARASSMENT AUTHORIZATIONS FOR OIL AND GAS" permits under section 101(a)(5) of the Marine Mammal Protection Act, as amended, for certain oil and gas

25

K+ and K- potentials in hadronic matter are observable quantities  

E-Print Network [OSTI]

The comparison of $K^+$ and $K^-$ spectra at low transverse momentum in light symmetric heavy ion reactions at energies around 2 AGeV allows for a direct experimental determination of the strength of the $K^+$ as well as of t he $K^-$ nucleus potential. Other little known or unknown input quantities like the production or rescattering cross sections of $K^+$ and $K^-$ mesons do not spoil this signal. This result, obtained by simulations of these reactio ns with the Isospin Quantum Molecular Dynamics (IQMD) model, may solve the longstanding question of the behaviour of the $K^-$ in hadronic matter and especially whether a $K^-$ condensate can be formed in heavy ion collisions.

Aman D. Sood; Ch. Hartnack; andJ. Aichelin

2011-05-09T23:59:59.000Z

26

Arizona Quantity of Production Associated with Reported Wellhead Value  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProved Reserves (Billion CubicCubic Feet)Year Jan(Million Cubic Feet) Quantity of

27

Idaho Nuclear Technology and Engineering Center (INTEC) Sodium Bearing Waste - Waste Incidental to Reprocessing Determination  

SciTech Connect (OSTI)

U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management, Section I.1.C, requires that all radioactive waste subject to Department of Energy Order 435.1 be managed as high-level radioactive waste, transuranic waste, or low-level radioactive waste. Determining the radiological classification of the sodium-bearing waste currently in the Idaho Nuclear Technology and Engineering Center Tank Farm Facility inventory is important to its proper treatment and disposition. This report presents the technical basis for making the determination that the sodium-bearing waste is waste incidental to spent fuel reprocessing and should be managed as mixed transuranic waste. This report focuses on the radiological characteristics of the sodiumbearing waste. The report does not address characterization of the nonradiological, hazardous constituents of the waste in accordance with Resource Conservation and Recovery Act requirements.

Jacobson, Victor Levon

2002-08-01T23:59:59.000Z

28

A Stochastic Perishable Inventory System with Random Supply Quantity  

E-Print Network [OSTI]

This paper considers a continuous review perishable inventory system with demands ar-rive according to a Markovian arrival process (MAP). We model, in this paper, the situation in which not all the ordered items are usable and the supply may contain a fraction of defec-tive items. The number of usable items is a random quantity. We consider a modified (s, S) policy which allows a finite number of pending order to be placed. We assume full back-logging of demands that occurred during stock out periods and that the recent backlogged demand may renege the system after an exponentially distributed amount of time. The limiting distribution of the inventory level is derived and shown to have matrix geometric form. The measures of system performance in the steady state are derived.

Paul Manuel; A. Shophia Lawrence; G. Arivarignan

29

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

30

A comparison of methods for representing sparsely sampled random quantities.  

SciTech Connect (OSTI)

This report discusses the treatment of uncertainties stemming from relatively few samples of random quantities. The importance of this topic extends beyond experimental data uncertainty to situations involving uncertainty in model calibration, validation, and prediction. With very sparse data samples it is not practical to have a goal of accurately estimating the underlying probability density function (PDF). Rather, a pragmatic goal is that the uncertainty representation should be conservative so as to bound a specified percentile range of the actual PDF, say the range between 0.025 and .975 percentiles, with reasonable reliability. A second, opposing objective is that the representation not be overly conservative; that it minimally over-estimate the desired percentile range of the actual PDF. The presence of the two opposing objectives makes the sparse-data uncertainty representation problem interesting and difficult. In this report, five uncertainty representation techniques are characterized for their performance on twenty-one test problems (over thousands of trials for each problem) according to these two opposing objectives and other performance measures. Two of the methods, statistical Tolerance Intervals and a kernel density approach specifically developed for handling sparse data, exhibit significantly better overall performance than the others.

Romero, Vicente Jose; Swiler, Laura Painton; Urbina, Angel; Mullins, Joshua

2013-09-01T23:59:59.000Z

31

Estimating physical quantities for an observed galactic microlensing event  

E-Print Network [OSTI]

For a given spatial distribution of the lenses and distribution of the transverse velocity of the lens relative to the line-of-sight, a probability distribution for the lens mass for a single observed event is derived. In addition, similar probability distributions are derived for the Einstein radius and the separation of the lens objects and their rotation period for a binary lens. These probability distributions are distinct from the distributions for the lens population, as investigated e.g. by the mass moment method of De Rujula, Jetzer, and Masso (1991). However, it is shown that the expectation value for the mass from the probability distribution coincides with the value from the mass moment method applied to a single observed event. The special cases of a Maxwellian velocity distribution and of a constant velocity are discussed in detail. For a rudimentary model of the Galactic halo, the probability distributions are shown and the relations between the expectation values of the physical quantities and the event timescale are given. For this model, it is shown that within a 95.4%-interval around the expectation value, the mass varies by a factor of 800.

M. Dominik

1997-11-13T23:59:59.000Z

32

ACTIONS AND PARTIAL ACTIONS OF INDUCTIVE CONSTELLATIONS  

E-Print Network [OSTI]

ACTIONS AND PARTIAL ACTIONS OF INDUCTIVE CONSTELLATIONS VICTORIA GOULD AND CHRISTOPHER HOLLINGS structure of a semigroup can be recovered from a partial order it possesses. Date: August 13, 2009. 2000 and FEDER, and also FCT post-doctoral grant SFRH/BPD/34698/2007. 1 #12;2 VICTORIA GOULD AND CHRISTOPHER

Gould, Victoria

33

October 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Project No. SAFT-0109 Continued on next page Standards Actions Page 2 October 2006 2.0 NON-GOVERNMENT STANDARDS ACTIONS 2.1 American National Standards Institute American...

34

July 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

were received in June 2006. Continued on next page Standards Actions Page 2 July 2005 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

35

Derivative actions in China  

E-Print Network [OSTI]

The enactment of derivative action was expected to be actively used by shareholders to protect their interests. In fact, it turned out that this reform effort seemed futile as the right to engage in such actions was ...

Lin, Shaowei

2014-07-02T23:59:59.000Z

36

Use of Shark Shapes to Reduce Incidental Capture of Sea Turtles in the Long-Line Fisheries  

E-Print Network [OSTI]

as incidental catch by the pelagic long-line fishing industry. Various gear and bait modifications as well as time/area closures to fishing, enacted to reduce anthropogenic impacts on sea turtles, have been ineffective or incompatible with regional fishery...). Table 1. Average carapace length and size range (CCL) of loggerhead sea turtles caught in the pelagic long-line industry (adapted from Wallace 2008). Ocean Basin Area Mean Size (CCL in cm) (+ SD) Size Range (CCL in cm) N Atlantic US Atlantic...

Bostwick, Angela Sue

2011-10-21T23:59:59.000Z

37

May 2008 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society...

38

May 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society...

39

November 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National...

40

October 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National...

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Protective Actions and Reentry  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

42

Climate Action Plan (Kentucky)  

Broader source: Energy.gov [DOE]

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

43

Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity  

E-Print Network [OSTI]

Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity Market, GA, 30332-0205 USA March 3, 2005 Abstract This paper addresses quantity risk in the electricity of a load serving entity, which provides electricity service at a regulated price in electricity markets

44

Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity Market  

E-Print Network [OSTI]

Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity MarketScience (www.interscience.wiley.com). Abstract: This paper addresses quantity risk in the electricity market-serving entity, which provides electricity service at a regulated price in electricity markets with price

Oren, Shmuel S.

45

A GEOCHEMICAL MODULE FOR "AMDTreat" TO COMPUTE CAUSTIC QUANTITY, EFFLUENT QUALITY, AND SLUDGE VOLUME1  

E-Print Network [OSTI]

1413 A GEOCHEMICAL MODULE FOR "AMDTreat" TO COMPUTE CAUSTIC QUANTITY, EFFLUENT QUALITY, AND SLUDGE with the quantities of chemical added and sludge produced. The pH and metals concentrations do not change linearlyH and the corresponding effluent composition and sludge volume can not be accurately determined without empirical

46

BLOW UP OF SUBCRITICAL QUANTITIES AT THE FIRST SINGULAR TIME OF THE MEAN CURVATURE FLOW  

E-Print Network [OSTI]

BLOW UP OF SUBCRITICAL QUANTITIES AT THE FIRST SINGULAR TIME OF THE MEAN CURVATURE FLOW NAM Q. LE curvature flow, singularity time, blow up, subcritical quantities. 1 #12;2 NAM Q. LE develop singularities, we give a logarithmic improvement of the above results by showing that a family of subcritical

Le, Nam

47

A-posteriori estimation and adaptive control of the error in the solution quantity of interest  

E-Print Network [OSTI]

-posteriori estimation and adaptive control of the error in the quantity of interest. The major tool for the estimation of the error in the desired quantity is the splitting of the error into two components: the near-field or local error, and the far-field or pollution...

Datta, Dibyendu Kumar, Dd 1973-

1997-01-01T23:59:59.000Z

48

Energy Action Month  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote energy- and water-saving practices in Federal facilities. This year's outreach materials call on Federal employees to take action and empower leadership, innovation, and excellence to realize a secure energy future.

49

Sodium dichromate expedited response action assessment  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) perform an expedited response action (ERA) for the Sodium Dichromate Barrel Disposal Landfill. The ERA lead regulatory agency is Ecology and EPA is the support agency. The ERA was categorized as non-time-critical, which required preparation of an engineering evaluation and cost analysis (EE/CA). The EE/CA was included in the ERA proposal. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the Sodium Dichromate Barrel Disposal Landfill is the only waste site within the operable unit, the removal action may be the final remediation of the 100-IU-4 Operable Unit. This ERA process started in March 1992. The ERA proposal went through a parallel review process with Westinghouse Hanford Company (WHC), DOE Richland Operations (RL), EPA, Ecology, and a 30-day public comment period. Ecology and EPA issued an Action Agreement Memorandum in March 1993 (Appendix A). The memorandum directed excavation of all anomalies and disposal of the collected materials at the Hanford Site Central Landfill. Primary field activities were completed by the end of April 1993. Final waste disposal of a minor quantity of hazardous waste was completed in July 1993.

Not Available

1993-09-01T23:59:59.000Z

50

August 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

August 2007 1.5 DOE Technical Standards Published No entries were received in August 2007 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

51

July 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

in June 2007 1.5 DOE Technical Standards Published No entries were received in June 2007 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

52

April 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

and Injury Surveillance Program Guidelines, 03222007; DOE-STD-1190-2007, OCSH-0005 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

53

Climate Action Plan (Maine)  

Broader source: Energy.gov [DOE]

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

54

Corrective Action Program Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

2006-03-02T23:59:59.000Z

55

E-Print Network 3.0 - aerodynamic surface quantities Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: aerodynamic surface quantities Page: << < 1 2 3 4 5 > >> 1 J. Phys. III Franc-e 4 (1994)...

56

THE U.S. NATIONAL PLAN OF ACTION FOR REDUCING THE INCIDENTAL CATCH OF SEABIRDS IN LONGLINE FISHERIES (NPOA): ITS IMPLMENTATION IN THE U.S. ATLANTIC TUNA,  

E-Print Network [OSTI]

of the Endangered Species Act and the Migratory Bird Treaty Act. In addition, DOS has the lead role in international

57

Use of the Waste-Incidental-to-Reprocessing Citation Process at the West Valley Demonstration Project - 12250  

SciTech Connect (OSTI)

The West Valley Demonstration Project recently achieved a breakthrough in management of radioactive waste from reprocessing of spent nuclear fuel by taking advantage of lessons learned at other Department of Energy (DOE) sites in implementation of the waste-incidental-to-reprocessing citation process of DOE Manual 435.1-1, Radioactive Waste Management. This breakthrough involved a revision to the site procedure on waste-incidental to reprocessing. This procedure revision served as the basis for a determination by the DOE West Valley field office using the citation process that three secondary waste streams consisting of equipment that had once been contaminated by association with HLW are not HLW following decontamination and may be disposed of as low-level waste (LLW) or transuranic waste. These waste streams, which comprised much of the approximately 380 cubic meters of West Valley waste contaminated by association with HLW, included several vessels and certain tank farm equipment. By making use of lessons learned in use of the citation process by other DOE sites and information developed to support use of the citation process at the Hanford site and the Savannah River Site, the team developed a technical basis for showing that use of the citation process of DOE Manual 435.1-1 for the three new waste stream was appropriate and technically justified. The Waste Management Working Group of the EFCOG assisted in transferring lessons learned by drawing on experience from around the DOE complex. This process shared knowledge about effective implementation of the citation process in a manner that proved to be beneficial to the West Valley Demonstration Project and resulted in a technical basis document that could be used to determine that the three new waste streams were not HLW. (authors)

Sullivan, Dan; Suttora, Linda [U.S. Department of Energy (United States); Goldston, Sonny [EnergySolutions - USA (United States); Petras, Robert [Savannah River Remediation (United States); Rowell, Laurene [URS Corporation (United States); McNeil, Jim [Consultant - USA (United States)

2012-07-01T23:59:59.000Z

58

Viewing biology in action | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Viewing biology in action Viewing biology in action DOE-funded pilot program will create mesoscale biological imaging platform James Evans EMSL received first-year funding of...

59

AN OVERVIEW OF TOOL FOR RESPONSE ACTION COST ESTIMATING (TRACE)  

SciTech Connect (OSTI)

Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel{reg_sign} workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

FERRIES SR; KLINK KL; OSTAPKOWICZ B

2012-01-30T23:59:59.000Z

60

Mitigation Action Plan  

SciTech Connect (OSTI)

This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

Not Available

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

DIRECTOR'S REPORT Diminishing quantities of water and their management continue to be a problem for Nebraska . In addition to  

E-Print Network [OSTI]

DIRECTOR'S REPORT Diminishing quantities of water and their management continue to be a problem of the Interior, contains eight research projects related to the Water Quantity and Management and Water Quality programs outlined in the "Research Framework." Water Quantity and Management Declining groundwater tables

Nebraska-Lincoln, University of

62

Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for the CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The site will be investigated based on the data quality objectives (DQOs) developed on July 6, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for the Baneberry site. The primary release associated with Corrective Action Unit 365 was radiological contamination from the Baneberry nuclear test. Baneberry was an underground weapons-related test that vented significant quantities of radioactive gases from a fissure located in close proximity to ground zero. A crater formed shortly after detonation, which stemmed part of the flow from the fissure. The scope of this investigation includes surface and shallow subsurface (less than 15 feet below ground surface) soils. Radionuclides from the Baneberry test with the potential to impact groundwater are included within the Underground Test Area Subproject. Investigations and corrective actions associated with the Underground Test Area Subproject include the radiological inventory resulting from the Baneberry test.

Patrick Matthews

2010-12-01T23:59:59.000Z

63

Asymptotically anti-de Sitter spacetimes and conserved quantities in higher curvature gravitational theories  

SciTech Connect (OSTI)

We consider n-dimensional asymptotically anti-de Sitter spacetimes in higher curvature gravitational theories with n{>=}4, by employing the conformal completion technique. We first argue that a condition on the Ricci tensor should be supplemented to define an asymptotically anti-de Sitter spacetime in higher curvature gravitational theories and propose an alternative definition of an asymptotically anti-de Sitter spacetime. Based on that definition, we then derive a conservation law of the gravitational field and construct conserved quantities in two classes of higher curvature gravitational theories. We also show that these conserved quantities satisfy a balance equation in the same sense as in Einstein gravity and that they reproduce the results derived elsewhere. These conserved quantities are shown to be expressed as an integral of the electric part of the Weyl tensor alone and hence they vanish identically in the pure anti-de Sitter spacetime as in the case of Einstein gravity.

Okuyama, Naoya [Department of Physics, Waseda University, Okubo 3-4-1, Shinjuku, Tokyo 169-8555 (Japan); Koga, Jun-ichirou [Advanced Research Institute for Science and Engineering, Waseda University, Okubo 3-4-1, Shinjuku, Tokyo 169-8555 (Japan)

2005-04-15T23:59:59.000Z

64

(Super)^n-Energy for arbitrary fields and its interchange: Conserved quantities  

E-Print Network [OSTI]

Inspired by classical work of Bel and Robinson, a natural purely algebraic construction of super-energy tensors for arbitrary fields is presented, having good mathematical and physical properties. Remarkably, there appear quantities with mathematical characteristics of energy densities satisfying the dominant property, which provides super-energy estimates useful for global results and helpful in other matters. For physical fields, higher order (super)^n-energy tensors involving the field and its derivatives arise. In Special Relativity, they provide infinitely many conserved quantities. The interchange of super-energy between different fields is shown. The discontinuity propagation law in Einstein-Maxwell fields is related to super-energy tensors, providing quantities conserved along null hypersurfaces. Finally, conserved super-energy currents are found for any minimally coupled scalar field whenever there is a Killing vector.

J. M. M. Senovilla

1999-05-17T23:59:59.000Z

65

POSITION MANAGEMENT ACTION FORM  

E-Print Network [OSTI]

POSITION MANAGEMENT ACTION FORM Workforce Planning | 408-924-2250 classcomp@sjsu.edu SJSU Human FOR POSITION MANAGEMENT FORM Workforce Planning | 408-924-2250| classcomp@sjsu.edu SJSU Human Resources Revised contact your Workforce Planning Analyst. List the name of the position this position reports to

Eirinaki, Magdalini

66

Action Plan Materials Science  

E-Print Network [OSTI]

sense, including all strata) has available to it a wide range of con- venient products which improve, improving companies' pros- pects and generating wealth without harming the environment. And allAction Plan 2010-2013 Materials Science Area EXECUTIVE SUMMARY #12;N.B.: If you require any further

Fitze, Patrick

67

Proposal for a quantity based data model in the Virtual Observatory  

E-Print Network [OSTI]

We propose the beginnings of a data model for the Virtual Observatory (VO) built up from simple ``quantity'' objects. In this paper we present how an object-oriented, domain (or namespace)-scoped simple quantity may be used to describe astronomical data. Our model is designed around the requirements that it be searchable and serve as a transport mechanism for all types of VO data and meta-data. In this paper we describe this model in terms of an OWL ontology and UML diagrams. An XML schema is available online.

Brian Thomas; Edward Shaya

2003-12-23T23:59:59.000Z

68

Incidental Noticing and EFL Students Subsequent Second Language Learning in Synchronous Text-based Discussion: An Investigation of Both NES-NNES and NNES-NNES Dyads  

E-Print Network [OSTI]

; Ross, 2005; Takahashi, 2001, 2005). According to Bardovi-Harlig and Dornyei (1998), the disparity between nonnative speakers? (NNSs?) and native speakers? (NSs?) pragmatic competence may be due to vital factors associated with input: ?the availability... (Pasternak & Bailey, 2004) than the NNSs, they may be able to provide their NNSs peers with more pragmatic-related feedback than NNSs can do to each other . As a result, it is logical to speculate that that the occurrences of incidental focus...

Kung, Wan-Tsai

2010-10-12T23:59:59.000Z

69

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Corrective Action Unit (CAU) 541 is...

70

Reliability and precision are two different quantities. When you make an appointment with your friend, she  

E-Print Network [OSTI]

Reliability and precision are two different quantities. When you make an appointment with your or might not be on time. The former uncertainty is related to reliability, whereas the latter is related occur on each trial the neuron is said to be reliable, whereas when the spikes occur almost at the same

Fellous, Jean-Marc

71

Quantities of Arsenic-Treated Wood in Demolition Debris Generated by  

E-Print Network [OSTI]

Research Quantities of Arsenic-Treated Wood in Demolition Debris Generated by Hurricane Katrina B R of the demolition debris is wood waste of which a significant proportion is treated with preservatives, including preservatives containing arsenic. As a result of the large scale destruction of treated wood structures

Florida, University of

72

Taxes Versus Quantities for a Stock Pollutant with Endogenous Abatement Costs and Asymmetric  

E-Print Network [OSTI]

Taxes Versus Quantities for a Stock Pollutant with Endogenous Abatement Costs and Asymmetric a (strategic) regulator and (nonstrate- gic) firms have asymmetric information about abatement costs, and all abatement costs. For general functional forms, firms' investment policy is information-constrained efficient

Karp, Larry S.

73

Introducing Flexible Quantity Contracts into Distributed SoC and Embedded System Design Processes  

E-Print Network [OSTI]

Introducing Flexible Quantity Contracts into Distributed SoC and Embedded System Design Processes and flexible contracts regulate cooperation and cost distribution. The process ef- fectively delays the design a distributed design process. Today we already find dis- tributed design processes in automotive engineering

Paris-Sud XI, Université de

74

Brookhaven National Laboratory/Photon Sciences Subject: NSLS Explosives Training (de minimis quantities)  

E-Print Network [OSTI]

quantities) Number: PS-ESH-0091 Revision: 01 Effective: 06/29/2012 Page 1 of 2 The only official copy). BNL Explosives Review Committee and Photon Sciences ESH review all experiments in order to assure) Number: PS-ESH-0091 Revision: 01 Effective: 06/29/2012 Page 2 of 2 The only official copy of this file

Ohta, Shigemi

75

Predicting Experimental Quantities in Protein Folding Kinetics using Stochastic Roadmap Simulation  

E-Print Network [OSTI]

Predicting Experimental Quantities in Protein Folding Kinetics using Stochastic Roadmap Simulation the transition state ensemble (TSE) and predict the rates and -values for protein folding. The new method as a gen- eral tool for studying protein folding kinetics. 1 Introduction Protein folding is a crucial

Pratt, Vaughan

76

Using Stochastic Roadmap Simulation to Predict Experimental Quantities in Protein Folding Kinetics: Folding Rates and  

E-Print Network [OSTI]

Using Stochastic Roadmap Simulation to Predict Experimental Quantities in Protein Folding Kinetics for studying protein folding kinetics. It uses the recently intro- duced Stochastic Roadmap Simulation (SRS validate the SRS method and indicate its potential as a general tool for studying protein folding kinetics

Pratt, Vaughan

77

SAVEnergy Action Plans  

SciTech Connect (OSTI)

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

78

CLEMSON UNIVERSITY Sustainability Action Plan  

E-Print Network [OSTI]

.......................................................................... 8 Action Steps for Sustainability Education, Culture, and Leadership CLEMSON UNIVERSITY Sustainability Action Plan Submitted by the President's Commission on Sustainability, August 1, 2011 Version 1.0.9 #12; 1 Table of Contents President

Duchowski, Andrew T.

79

Climate Action Plan (Manitoba, Canada)  

Broader source: Energy.gov [DOE]

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

80

Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522  

SciTech Connect (OSTI)

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has been overlooked and to verify the inventory. After each site has approved their project plan, the site will begin writing procedures and packaging/repackaging their waste. In some cases the sites have already begun the process. The waste will be shipped after all of the waste has been characterized and approved.

Mctaggart, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila [Los Alamos National Laboratory; Gadbury, Casey [DOE

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

VIOLENT FRAMES IN ACTION  

SciTech Connect (OSTI)

We present a computational approach to radical rhetoric that leverages the co-expression of rhetoric and action features in discourse to identify violent intent. The approach combines text mining and machine learning techniques with insights from Frame Analysis and theories that explain the emergence of violence in terms of moral disengagement, the violation of sacred values and social isolation in order to build computational models that identify messages from terrorist sources and estimate their proximity to an attack. We discuss a specific application of this approach to a body of documents from and about radical and terrorist groups in the Middle East and present the results achieved.

Sanfilippo, Antonio P.; McGrath, Liam R.; Whitney, Paul D.

2011-11-17T23:59:59.000Z

82

Mitigation Action Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource Program PreliminaryA3,0Statements |Mission73 4.17Mitigation Action

83

Interim Action Determination  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 U.S. Department ofAboutWAPAInterim Action

84

SAFETY ANALYSIS REPORT FOR PACKAGING, MODEL 9977, ADDENDUM 3, JUSTIFICATION FOR SMALL GRAM QUANTITY CONTENTS  

SciTech Connect (OSTI)

This Addendum establishes a new family of content envelopes consisting of small quantities of radioactive materials. These content envelopes and specific packing configurations are shown to be subcritical. However, the dose rates of some payloads must be measured and shown to comply with applicable radiation limits. Authorization for shipment of the content envelop requires acceptance of this Addendum by the DOE-HQ certifying official as a supplement to the 9977 SARP Revision 2 and DOE-HQ?s subsequent revision of the CoC Revision 10 (which is based on SARP Addendum 2 and SARP Addendum 4) to authorize the additional content envelope. The Small Gram Quantity Content Envelopes and packing configurations will be incorporated in the next revision of the 9977 SARP.

Abramczyk, G.

2011-10-31T23:59:59.000Z

85

Blast furnace injection of massive quantities of coal with enriched air or pure oxygen  

SciTech Connect (OSTI)

An extensive study of the phenomena associated with the blast furnace injection of massive quantities of coal is described. Trials with conventional lances or oxy-coal injectors and hot blast at different oxygen contents - up to 40% - or with cold pure oxygen were realized at coal to oxygen ratios corresponding to a range of 150 to 440 kg. Pilot scale rigs, empty or filled with coke, as well as industrial blast furnaces were utilized.

Ponghis, N.; Dufresne, P.; Vidal, R.; Poos, A. (Center de Recherches Metallurgiques, Liege (Belgium))

1993-01-01T23:59:59.000Z

86

DELPHI expert panel evaluation of Hanford high level waste tank failure modes and release quantities  

SciTech Connect (OSTI)

The Failure Modes and Release Quantities of the Hanford High Level Waste Tanks due to postulated accident loads were established by a DELPHI Expert Panel consisting of both on-site and off-site experts in the field of Structure and Release. The Report presents the evaluation process, accident loads, tank structural failure conclusion reached by the panel during the two-day meeting.

Dunford, G.L.; Han, F.C.

1996-09-30T23:59:59.000Z

87

Variational symmetries, conserved quantities and identities for several equations of mathematical physics  

SciTech Connect (OSTI)

We find variational symmetries, conserved quantities and identities for several equations: envelope equation, Bcher equation, the propagation of sound waves with losses, flow of a gas with losses, and the nonlinear Schrdinger equation with losses or gains, and an electro-magnetic interaction. Most of these equations do not have a variational description with the classical variational principle and we find such a description with the generalized variational principle of Herglotz.

Donchev, Veliko, E-mail: velikod@ie.bas.bg [Laboratory Physical Problems of Electron and Ion Technologies, Institute of Electronics, Bulgarian Academy of Sciences, 72 Tzarigradsko shosse, 1784 Sofia (Bulgaria)] [Laboratory Physical Problems of Electron and Ion Technologies, Institute of Electronics, Bulgarian Academy of Sciences, 72 Tzarigradsko shosse, 1784 Sofia (Bulgaria)

2014-03-15T23:59:59.000Z

88

REMEDIAL ACTION PLAN  

E-Print Network [OSTI]

designated site consists of the 111-acre tailings pile, the mill yard, and piles of demolition rubble awaiting burial. The site contains 2.659 million cubic yards of tailings including 277,000 cubic yards of contaminated material in the mill yard, ore storage area, and Ann Lee Mine area; 151,000 cubic yards in the protore storage and leach pad areas; and 664,000 cubic yards of windblown contaminated soil, including excess soil that would result from excavation. Remedial action The remedial action will start with the excavation of windblown contaminated material and placement around the west, south, and east sides of the pile to buttress the slopes for increased stability. Most of the demolition rubble will be placed in the southern part of the pile and be covered with tailings. The northern part of the tailings pile (one million cubic yards) will then be excavated and placed on the south part of the pile to reduce the size of the disposal cell footprint. Demolition rubble that

Inactive Uranium; Mill Tailings Site; Uranium Mill Tremedial

1990-01-01T23:59:59.000Z

89

Macroscopic Properties of Restacked, Redox-Liquid Exfoliated Graphite and Graphite Mimics Produced in Bulk Quantities  

SciTech Connect (OSTI)

The excellent properties exhibited by monolayer graphene have spurred the development of exfoliation techniques using bulk graphite to produce large quantities of pristine monolayer sheets. Development of simple chemistry to exfoliate and intercalate graphite and graphite mimics in large quantities is required for numerous applications. To determine the macroscopic behavior of restacked, exfoliated bulk materials, a systematic approach is presented using a simple, redox-liquid sonication process along to obtain large quantities of 2D and 3D hexagonally layered graphite, molybdenum disulfi de, and boron nitride, which are subsequently characterized to observe chemical and structural changes. For MoS 2 sonicated with the antioxidant sodium bisulfi te, results from Raman spectroscopy, X-ray diffraction, and electron microscopy indicate the presence of distorted phases from different polymorphs, and apparent nanotube structures in the bulk, restacked powder. Furthermore, using thermograviemtric analysis, the antioxidant enhances the resistance to oxidative degradation of MoS 2 , upon thermal treatment up to 900 C. The addition of the ionic antioxidant decreased dispersion stability in non-polar solvent, suggesting decreased compatibility with non-polar systems. Using simple chemical methods, the ability to generate tailored multidimensional layered materials with unique macroscopic properties is critical for numerous applications, including electrical devices, reinforced polymer composites, lithium ion capacitors, and chemical sensing.

Srivastava, Vikram K [ORNL; Quinlan, Ronald [ORNL; Agapov, Alexander L [ORNL; Dunlap, John R [ORNL; Nelson, Kimberly M [ORNL; Duranty, Edward R [ORNL; Sokolov, Alexei P [ORNL; Bhat, Gajanan [ORNL; Mays, Jimmy [ORNL

2014-01-01T23:59:59.000Z

90

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Temp Data Fields Matthews, Patrick...

91

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...  

Broader source: Energy.gov (indexed) [DOE]

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Philadelphia, Pennsylvania: Solar in Action (Brochure),...

92

Guam Energy Action Plan  

SciTech Connect (OSTI)

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

93

Joint production and economic retention quantity decisions in capacitated production systems serving multiple market segments  

E-Print Network [OSTI]

: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : 44 VITA : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : 46 viii LIST OF FIGURES FIGURE Page 1 Sensitivity of the economic retention quantity with respect to the lost sales penalty when r1 = 100, p = 50, h = 12:5, E[X1...] = E[X2] = E[X3] = 100, C1 = C2 = C2 = 100 : : : : : : : : : : : : : : 36 2 Sensitivity of the optimal-produce up-to level with respect to the lost sales penalty when r1 = 100, p = 50, r2 = 40, h = 12:5, E[X1] = E[X2] = E[X3] = 100, C1 = C2 = C2 = 100...

Katariya, Abhilasha Prakash

2009-05-15T23:59:59.000Z

94

Table A27. Quantity of Purchased Electricity, Steam, and Natural Gas by Type  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative FuelsTotal" (Percent) Type: Sulfur Content API Gravity Period: Monthly Annual Download Series History71.7 588.5 56,673.61Quantity of Purchased

95

Table A30. Quantity of Electricity Sold to Utility and Nonutility Purchasers  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative FuelsTotal" (Percent) Type: Sulfur Content API Gravity Period: Monthly Annual Download Series History71.7 588.5 56,673.61QuantityA3. PAD

96

Table A31. Quantity of Electricity Sold to Utility and Nonutility Purchasers  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative FuelsTotal" (Percent) Type: Sulfur Content API Gravity Period: Monthly Annual Download Series History71.7 588.5 56,673.61QuantityA3. PAD0.

97

"Table A32. Total Quantity of Purchased Energy Sources by Census Region,"  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 103. Relative Standard Errors for Table2" "Quantity of

98

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network [OSTI]

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

99

STUDENT DISCIPLINARY ACTION FORM INSTRUCTIONS  

E-Print Network [OSTI]

STUDENT DISCIPLINARY ACTION FORM INSTRUCTIONS Labor Program Office Berea College While one across campus. The "Student Disciplinary Action Form" was designed to provide labor supervisors directly with the student and discuss the matter in private. Calmly discuss the offense and the corrective

Baltisberger, Jay H.

100

Comparison of Digestion Protocols for Microgram Quantities of Enriched Protein Samples  

SciTech Connect (OSTI)

Standard biochemical techniques that are used for protein enrichments, such as affinity isolation and density gradient centrifugation, frequently yield high nanogram to low microgram quantities at a significant expenditure of resources and time. The characterization of selected protein enrichments by the "shotgun" mass spectrometry approach is often compromised by the lack of effective and efficient in-solution proteolysis protocols specifically tailored for these small quantities of proteins. This study compares the results of five different digestion protocols that were applied to 2.5 g portions of protein isolates from two disparate sources: Rhodopseudomonas palustris 70S ribosomal proteins, and Bos taurus microtubule-associated proteins (MAPs). Proteolytic peptides produced according to each protocol in each type of protein isolate were analyzed by one-dimensional liquid chromatography-tandem mass spectrometry (LC-MS/MS). The effectiveness of each digestion protocol was assessed on the basis of three parameters: number of peptide identifications, number of protein identifications, and sequence coverage. The two protocols using a solvent containing 80% acetonitrile (CH3CN) for trypsin digestions performed as well as, and in some instances better than, protocols employing other solvents and chaotropes in both types of protein isolates. A primary advantage of the 80% CH3CN protocol is that it requires fewer sample manipulation steps.

Hervey, IV, William Judson [ORNL; Strader, Michael B [ORNL; Strader, Michael Brad [National Institutes of Health; Hurst, Gregory {Greg} B [ORNL

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan  

SciTech Connect (OSTI)

The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases.

Not Available

1994-07-01T23:59:59.000Z

102

Mind Out of Action: The Intentionality of Automatic Actions  

E-Print Network [OSTI]

We think less than we think. My thesis moves from this suspicion to show that standard accounts of intentional action can't explain the whole of agency. Causalist accounts such as Davidson's and Bratman's, according to ...

Di Nucci, Ezio

2008-01-01T23:59:59.000Z

103

actions significant actions: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

104

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network [OSTI]

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

105

Fluctuations of Conserved Quantities in High Energy Nuclear Collisions at RHIC  

E-Print Network [OSTI]

Fluctuations of conserved quantities in heavy-ion collisions are used to probe the phase transition and the QCD critical point for the strongly interacting hot and dense nuclear matter. The STAR experiment has carried out moment analysis of net-proton (proxy for net-baryon (B)), net-kaon (proxy for net-strangeness (S)), and net-charge (Q). These measurements are important for understanding the quantum chromodynamics phase diagram. We present the analysis techniques used in the moment analysis by the STAR experiment and discuss the moments of net-proton and net-charge distributions from the first phase of the Beam Energy Scan program at the Relativistic Heavy Ion Collider.

Xiaofeng Luo

2015-01-13T23:59:59.000Z

106

Fluctuations of Conserved Quantities in High Energy Nuclear Collisions at RHIC  

E-Print Network [OSTI]

Fluctuations of conserved quantities in heavy-ion collisions are used to probe the phase transition and the QCD critical point for the strongly interacting hot and dense nuclear matter. The STAR experiment has carried out moment analysis of net-proton (proxy for net-baryon (B)), net-kaon (proxy for net-strangeness (S)), and net-charge (Q). These measurements are important for understanding the quantum chromodynamics phase diagram. We present the analysis techniques used in the moment analysis by the STAR experiment and discuss the moments of net-proton and net-charge distributions from the first phase of the Beam Energy Scan program at the Relativistic Heavy Ion Collider.

Luo, Xiaofeng

2015-01-01T23:59:59.000Z

107

Statistics of Conserved Quantities in Mechanically Stable Packings of Frictionless Disks Above Jamming  

E-Print Network [OSTI]

We numerically simulate mechanically stable packings of soft-core, frictionless, bidisperse disks in two dimensions, above the jamming packing fraction $\\phi_J$. For configurations with a fixed isotropic global stress tensor, we compute the averages, variances, and correlations of conserved quantities (stress $\\Gamma_{\\cal C}$, force-tile area $A_{\\cal C}$, Voronoi volume $V_{\\cal C}$, number of particles $N_{\\cal C}$, and number of small particles $N_{s{\\cal C}}$) on compact subclusters of particles ${\\cal C}$, as a function of the cluster size and the global system stress. We find several significant differences depending on whether the cluster ${\\cal C}$ is defined by a fixed radius $R$ or a fixed number of particles $M$. We comment on the implications of our findings for maximum entropy models of jammed packings.

Yegang Wu; S. Teitel

2014-10-03T23:59:59.000Z

108

Application of Specialized Optimization Techniques in Water Quantity and Quality Management with Respect to Planning for the Trinity River Basi  

E-Print Network [OSTI]

for the disposal of wastes. Thus, there is a clear interaction between quantity and quality of water. However, largely due to the agency structure in state and federal government, water quality management and water development activities are usually separated...

Meier Jr., W. L.; Shih, C. S.

109

Climate Action Plan (Ontario, Canada)  

Broader source: Energy.gov [DOE]

Climate Ready, Ontario's Adaptation Strategy and Action Plan, outlines the problems, goals, and key strategies for the province's approach to climate change and the problems it poses. The Plan...

110

ICDF Complex Remedial Action Report  

SciTech Connect (OSTI)

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

111

Climate Action Plan (New Hampshire)  

Broader source: Energy.gov [DOE]

29 members of Governor John Lynchs Climate Change Policy Task Force developed a Climate Action Plan in 2009. It is aimed at achieving the greatest feasible reductions in greenhouse gas emissions...

112

Climate Action Champions Request for Applications | Department...  

Broader source: Energy.gov (indexed) [DOE]

Climate Action Champions Request for Applications Climate Action Champions Request for Applications October 27, 2014 5:00PM EDT Climate Action Champions On Oct. 1, 2014, the Obama...

113

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network [OSTI]

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

114

Worldwide Energy Efficiency Action through Capacity Building...  

Open Energy Info (EERE)

and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Name Worldwide Energy Efficiency Action...

115

DOE Announces Additional Energy Efficiency Enforcement Action...  

Office of Environmental Management (EM)

Energy Efficiency Enforcement Action to Protect Consumers DOE Announces Additional Energy Efficiency Enforcement Action to Protect Consumers January 7, 2010 - 12:00am Addthis...

116

Energy Agency Coordinators for Energy Action Month  

Broader source: Energy.gov [DOE]

Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

117

PACKAGING CERTIFICATION PROGRAM METHODOLOGY FOR DETERMINING DOSE RATES FOR SMALL GRAM QUANTITIES IN SHIPPING PACKAGINGS  

SciTech Connect (OSTI)

The Small Gram Quantity (SGQ) concept is based on the understanding that small amounts of hazardous materials, in this case radioactive materials (RAM), are significantly less hazardous than large amounts of the same materials. This paper describes a methodology designed to estimate an SGQ for several neutron and gamma emitting isotopes that can be shipped in a package compliant with 10 CFR Part 71 external radiation level limits regulations. These regulations require packaging for the shipment of radioactive materials, under both normal and accident conditions, to perform the essential functions of material containment, subcriticality, and maintain external radiation levels within the specified limits. By placing the contents in a helium leak-tight containment vessel, and limiting the mass to ensure subcriticality, the first two essential functions are readily met. Some isotopes emit sufficiently strong photon radiation that small amounts of material can yield a large dose rate outside the package. Quantifying the dose rate for a proposed content is a challenging issue for the SGQ approach. It is essential to quantify external radiation levels from several common gamma and neutron sources that can be safely placed in a specific packaging, to ensure compliance with federal regulations. The Packaging Certification Program (PCP) Methodology for Determining Dose Rate for Small Gram Quantities in Shipping Packagings provides bounding shielding calculations that define mass limits compliant with 10 CFR 71.47 for a set of proposed SGQ isotopes. The approach is based on energy superposition with dose response calculated for a set of spectral groups for a baseline physical packaging configuration. The methodology includes using the MCNP radiation transport code to evaluate a family of neutron and photon spectral groups using the 9977 shipping package and its associated shielded containers as the base case. This results in a set of multipliers for 'dose per particle' for each spectral group. For a given isotope, the source spectrum is folded with the response for each group. The summed contribution from all isotopes determines the total dose from the RAM in the container.

Nathan, S.; Loftin, B.; Abramczyk, G.; Bellamy, S.

2012-05-09T23:59:59.000Z

118

Guidance Regarding Actions That May Proceed During the NEPA Process...  

Energy Savers [EERE]

Regarding Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to...

119

Conserved quantities and dual turbulent cascades in Anti-de Sitter spacetime  

E-Print Network [OSTI]

We consider the dynamics of a spherically symmetric massless scalar field coupled to general relativity in Anti--de Sitter spacetime in the small-amplitude limit. Within the context of our previously developed two time framework (TTF) to study the leading self-gravitating effects, we demonstrate the existence of two new conserved quantities in addition to the known total energy $E$ of the modes: The particle number $N$ and Hamiltonian $H$ of our TTF system. $H$ represents the next-order contribution after $E$ to the total ADM mass $M$. Simultaneous conservation of $E$ and $N$ implies that weak turbulent processes undergo dual cascades (direct cascade of $E$ and inverse cascade of $N$ or vice versa). This partially explains the observed dynamics of 2-mode initial data. In addition, conservation of $E$ and $N$ limits the region of phase space that can be explored within the TTF approximation and in particular rules out equipartion of energy among the modes for general initial data. Finally, we discuss possible effects of conservation of $N$ and $E$ on late time dynamics.

Alex Buchel; Stephen R. Green; Luis Lehner; Steven L. Liebling

2014-12-15T23:59:59.000Z

120

Conserved quantities and dual turbulent cascades in Anti-de Sitter spacetime  

E-Print Network [OSTI]

We consider the dynamics of a spherically symmetric massless scalar field coupled to general relativity in Anti--de Sitter spacetime in the small-amplitude limit. Within the context of our previously developed two time framework (TTF) to study the leading self-gravitating effects, we demonstrate the existence of two new conserved quantities in addition to the known total energy $E$ of the modes: The particle number $N$ and Hamiltonian $H$ of our TTF system. Simultaneous conservation of $E$ and $N$ implies that weak turbulent processes undergo dual cascades (direct cascade of $E$ and inverse cascade of $N$ or vice versa). This partially explains the observed dynamics of 2-mode initial data. In addition, conservation of $E$ and $N$ limits the region of phase space that can be explored within the TTF approximation and in particular rules out equipartion of energy among the modes for general initial data. Finally, we discuss possible effects of conservation of $N$ and $E$ on late time dynamics.

Alex Buchel; Stephen R. Green; Luis Lehner; Steven L. Liebling

2015-02-17T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

A wireless interrogation system exploiting narrowband acoustic resonator for remote physical quantity measurement  

SciTech Connect (OSTI)

Monitoring physical quantities using acoustic wave devices can be advantageously achieved using the wave characteristic dependence to various parametric perturbations (temperature, stress, and pressure). Surface acoustic wave (SAW) resonators are particularly well suited to such applications as their resonance frequency is directly influenced by these perturbations, modifying both the phase velocity and resonance conditions. Moreover, the intrinsic radio frequency (rf) nature of these devices makes them ideal for wireless applications, mainly exploiting antennas reciprocity and piezoelectric reversibility. In this paper, we present a wireless SAW sensor interrogation unit operating in the 434 MHz centered ISM band--selected as a tradeoff between antenna dimensions and electromagnetic wave penetration in dielectric media--based on the principles of a frequency sweep network analyzer. We particularly focus on the compliance with the ISM standard which reveals complicated by the need for switching from emission to reception modes similarly to radar operation. In this matter, we propose a fully digital rf synthesis chain to develop various interrogation strategies to overcome the corresponding difficulties and comply with the above-mentioned standard. We finally assess the reader interrogation range, accuracy, and dynamics.

Friedt, J.-M [SENSeOR, 32 Avenue de l'Observatoire, 25044 Besancon (France); Droit, C.; Martin, G.; Ballandras, S. [Department of Time and Frequency, FEMTO-ST, 32 Avenue de l'Observatoire, 25044 Besancon (France)

2010-01-15T23:59:59.000Z

122

Density equation of bio-coal briquettes and quantity of maize cob in Phitsanulok, Thailand  

SciTech Connect (OSTI)

One of the most important crops in Phitsanulok, a province in Northern Thailand, is maize. BaseD on the calculation, the quantity of maize cob produced in this region was approximately 220 kton year{sup -1}. The net heating value of maize cob was found to be 14.2 MJ kg{sup -1}. Therefore, the total energy over 874 TJ year-1 can be obtained from this agricultural waste. In the experiments, maize cob was utilized as the major ingredient for producing biomass-coal briquettes. The maize cob was treated with sodium hydroxide solution before mixing with coal fine. The ratios of coal:maize were 1:2 and 1:3, respectively. The range of briquetting pressures was from 4-8 MPa. The result showed that the density was strongly affected by both parameters. Finally, the relationship between biomass ratio, briquetting pressures and briquette density was developed and validated by using regression technique. 13 refs., 2 figs.

Patomsok Wilaipon [Naresuan University, Phitsanulok (Thailand). Department of Mechanical Engineering

2008-07-01T23:59:59.000Z

123

About the probability distribution of a quantity with given mean and variance  

E-Print Network [OSTI]

Supplement 1 to GUM (GUM-S1) recommends the use of maximum entropy principle (MaxEnt) in determining the probability distribution of a quantity having specified properties, e.g., specified central moments. When we only know the mean value and the variance of a variable, GUM-S1 prescribes a Gaussian probability distribution for that variable. When further information is available, in the form of a finite interval in which the variable is known to lie, we indicate how the distribution for the variable in this case can be obtained. A Gaussian distribution should only be used in this case when the standard deviation is small compared to the range of variation (the length of the interval). In general, when the interval is finite, the parameters of the distribution should be evaluated numerically, as suggested by I. Lira, Metrologia, 46 L27 (2009). Here we note that the knowledge of the range of variation is equivalent to a bias of the distribution toward a flat distribution in that range, and the principle of mini...

Olivares, Stefano

2012-01-01T23:59:59.000Z

124

CLIMATE ACTION PLAN JUNE 1, 2010  

E-Print Network [OSTI]

UC DAVIS 2009­2010 CLIMATE ACTION PLAN JUNE 1, 2010 #12;UC Davis 2009-2010 Climate Action Plan Page 2 UC DAVIS 2009-2010 CLIMATE ACTION PLAN TABLE OF CONTENTS Acknowledgements...................................................................................................... 24 Chapter 3: Emissions Reduction Actions 3.1 Energy Use Reduction to Date

Schladow, S. Geoffrey

125

The generalization of A. E. Kennelly theory of complex representation of the electrical quantities in sinusoidal periodic regime to the one and three-phase electric quantities in non-sinusoidal periodic regime  

E-Print Network [OSTI]

In this paper, a new mathematical method of electrical circuits calculus is proposed based on the theory of the complex linear operators in matrix form. The newly proposed method generalizes the theory of complex representation of electrical quantities in sinusoidal periodic regime to the non-sinusoidal periodic regime.

Gheorghe Mihai

2010-02-12T23:59:59.000Z

126

Know the symptoms. Take action.  

E-Print Network [OSTI]

1 " " Know the symptoms. Take action. heart attack c a l l Don't Take a Chance With a Heart Attack: Know the Facts and Act Fast More than 1 million people in the United States have heart attacks each attack happens, delay in treatment can be deadly. Learn the warning symptoms of a heart attack, and know

Bandettini, Peter A.

127

Know the symptoms. Take action.  

E-Print Network [OSTI]

heart attack Know the symptoms. Take action. c a l l Important Information Fill out the next two:____________________________ Home phone:_______________________ Work phone: ________________________ December 2011 #12;Heart Attack might be having heart attack symptoms or a heart attack, call 9­1­1 immediately. Don't ignore your pain

Bandettini, Peter A.

128

Climate Change Action Plan Report  

E-Print Network [OSTI]

Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

Hansen, Andrew J.

129

Climate Action Champions Informational Webinar  

Broader source: Energy.gov [DOE]

An informational webinar will be held on Thursday, Oct. 9 from 1:00 p.m. - 3:00 p.m. Eastern Standard Time (EST) to provide applicants with an overview of the Climate Action Champions opportunity, the application process, and answer any questions.

130

Action of manganese on puberty  

E-Print Network [OSTI]

to Mn than adults, we wanted to determine the effects of Mn exposure on puberty-related hormones and the onset of puberty, and discern the site and mechanism of Mn action. We demonstrated that the central administration of manganese chloride (MnCl2...

Lee, Bo Yeon

2007-09-17T23:59:59.000Z

131

CLIMATE ACTION PLAN SEPTEMBER 2009  

E-Print Network [OSTI]

CLIMATE ACTION PLAN SEPTEMBER 2009 UNIVERSITY OF NEW MEXICO · OFFICE OF SUSTAINABILITY · ALBUQUERQUE, NEW MEXICO #12;#12;The University of New Mexico is committed to reducing energy usage and our d. Policy 2100 "Sustainability"............ 53 e. Policy 5100 "Energy Management" 58 B. Future

Maccabe, Barney

132

A GREEN'S FUNCTION APPROACH FOR DETERMINING DOSE RATES FOR SMALL GRAM QUANTITIES IN SHIPPING PACKAGINGS  

SciTech Connect (OSTI)

The Small Gram Quantity (SGQ) concept is based on the understanding that small amounts of hazardous materials, in this case radioactive materials (RAM), are significantly less hazardous than large amounts of the same materials. This paper describes a methodology designed to estimate an SGQ for several neutron and gamma emitting isotopes that can be shipped in a package in compliance with 10 CFR Part 71 external radiation level limits regulations. The neutron and photon sources were calculated using both ORIGEN-S and RASTA. The response from a unit source in each neutron and photon group was calculated using MCNP5 with each unshielded and shielded container configuration. Effects of self-shielding on both neutron and photon response were evaluated by including either plutonium oxide or iron in the source region for the case with no shielded container. For the cases of actinides mixed with light elements, beryllium is the bounding light element. The added beryllium (10 to 90 percent of the actinide mass) in the cases studied represents between 9 and 47 percent concentration of the total mixture mass. For beryllium concentrations larger than 50 percent, the increase in the neutron source term and dose rate tend to increase at a much lower rate than at concentrations lower than 50%. The intimately mixed actinide-beryllium form used in these models is very conservative and thus the limits presented in this report are practical bounds on the mass that can be safely shipped. The calculated dose rate from one gram of each isotope was then used to determin the maximum amount of a single isotope that could be shipped in the Model 9977 Package (or packagings having the same or larger external dimensions as well as similar structural materials) and have the external radiation level within the regulatory dose limits at the surface of the package. The estimates of the mass limits presented would also serve as conservative limits for both the Models 9975 and 9978 packages. If a package contains a mixture of isotopes, the acceptability for shipment can be determined by a sum of fractions approach. It should be noted that the SGQ masses presented in this report represent limits that would comply with the external radiation limits under 10CFR Part 71. They do not necessarily bound lower limits that may be required to comply with other factors such as heat load of the package.

Nathan, S.

2012-06-14T23:59:59.000Z

133

CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

NONE

2006-09-01T23:59:59.000Z

134

Action  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartmentStewardshipAdministration helps INITIATED BY: INITIATEDLos

135

WOODS FOR LEARNING ACTION PLAN 2010-2013 Objective National Indicators Specific actions  

E-Print Network [OSTI]

WOODS FOR LEARNING ACTION PLAN 2010-2013 Objective National Indicators Specific actions Lead positive inspection reports Develop Forest Kindergarten with nurseries in both private and state sectors

136

Neighborhood Progress Through Organized Action.  

E-Print Network [OSTI]

[Blank Page in Original Bulletin] ~ei~ h borhood Progress Through Organized Action E. C. MARTIN, Administrative Assistant BONNIE COX, Organization Specialist MRS. EULA NEWMAN, Specialist in Home Management TEXAS A. & M. COLLEGE SYSTEM "The... coord: lent r peo plt 1. mmunity organization is successful when all families erested groups participate. Such an organization may inate interest in the community and provide an excel- neans for channeling most programs. The interest...

Newman, Eula; Cox, Bonnie; Martin, E. C.

1955-01-01T23:59:59.000Z

137

Riverland expedited response action proposal  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

138

5 Putting Science into Action on Forest  

E-Print Network [OSTI]

5 Putting Science into Action on Forest Service Lands William M. Block u.s. Forest Service, Rocky into Action on Forest Service Lands t':: Research and Development, National Forest Systems, State and Private Forestry, International Programs

139

Emergence and perceptual guidance of prehensile action  

E-Print Network [OSTI]

Successful coordination of prehensile action depends upon the selection and control of appropriate reach and grasp movements. This thesis explores how prehensile actions are shaped and regulated by perceptual information. ...

Smith, Joanne

2009-01-01T23:59:59.000Z

140

Corrective Action Investigation Plan for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) for Corrective Action Unit (CAU) 309, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The general purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 309 is comprised of the following three corrective action sites (CASs) in Area 12 of the NTS: (1) CAS 12-06-09, Muckpile; (2) CAS 12-08-02, Contaminated Waste Dump (CWD); and (3) CAS 12-28-01, I-, J-, and K-Tunnel Debris. Corrective Action Site 12-06-09 consists of a muckpile and debris located on the hillside in front of the I-, J-, and K-Tunnels on the eastern slopes of Rainier Mesa in Area 12. The muckpile includes mining debris (muck) and debris generated during the excavation and construction of the I-, J-, and K-Tunnels. Corrective Action Site 12-08-02, CWD, consists of a muckpile and debris and is located on the hillside in front of the re-entry tunnel for K-Tunnel. For the purpose of this investigation CAS 12-28-01 is defined as debris ejected by containment failures during the Des Moines and Platte Tests and the associated contamination that is not covered in the two muckpile CASs. This site consists of debris scattered south of the I-, J-, and K-Tunnel muckpiles and extends down the hillside, across the valley, and onto the adjacent hillside to the south. In addition, the site will cover the potential contamination associated with ''ventings'' along the fault, fractures, and various boreholes on the mesa top and face. One conceptual site model was developed for all three CASs to address possible contamination migration pathways associated with CAU 309. The data quality objective (DQO) process was used to identify and define the type, quantity, and quality of data needed to complete the investigation phase of the corrective action process. The DQO process addresses the primary problem that sufficient information is not available to determine the appropriate corrective action for the CAU. Due to the practical constraints posed by steep slopes on and around the CAU 309 muckpiles, a conservative, simplifying strategy was developed to resolve the presence and nature of contaminants. This strategy includes the use of historical data from similar sites (i.e., previously investigated NTS muckpiles) and the collection of samples from accessible areas of the muckpiles. Based on site history, process knowledge, and previous investigations of similar sites, contaminants of potential concern for CAU 309 collectively include radionuclides, total petroleum hydrocarbons (diesel range only), polychlorinated biphenyls, ''Resource Conservation and Recovery Act'' metals, volatile organic compounds, and semivolatile organic compounds.

Robert F. Boehlecke

2004-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

AFFIRMATIVE ACTION PLAN FOR VETERANS AND  

E-Print Network [OSTI]

creates a private right of action on behalf of any individual or group against the Health Center. #12AFFIRMATIVE ACTION PLAN FOR VETERANS AND INDIVIDUALS WITH DISABILITIES University of Connecticut Health Center UCHC Farmington, CT July 1, 2008 - June 30, 2009 #12;AFFIRMATIVE ACTION PLAN FOR VETERANS

Oliver, Douglas L.

142

"Table A33. Total Quantity of Purchased Energy Sources by Census Region, Census Division,"  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 103. Relative Standard Errors for Table2" "Quantity

143

A little here, a little there, a fairly big problem everywhere: Small quantity site transuranic waste disposition alternatives  

SciTech Connect (OSTI)

Small quantities of transuranic (TRU) waste represent a significant challenge to the waste disposition and facility closure plans of several sites in the Department of Energy (DOE) complex. This paper presents the results of a series of evaluations, using a systems engineering approach, to identify the preferred alternative for dispositioning TRU waste from small quantity sites (SQSs). The TRU waste disposition alternatives evaluation used semi-quantitative data provided by the SQSs, potential receiving sites, and the Waste Isolation Pilot Plant (WIPP) to select and recommend candidate sites for waste receipt, interim storage, processing, and preparation for final disposition of contact-handled (CH) and remote-handled (RH) TRU waste. The evaluations of only four of these SQSs resulted in potential savings to the taxpayer of $33 million to $81 million, depending on whether mobile systems could be used to characterize, package, and certify the waste or whether each site would be required to perform this work. Small quantity shipping sites included in the evaluation included the Battelle Columbus Laboratory (BCL), University of Missouri Research Reactor (MURR), Energy Technology Engineering Center (ETEC), and Mound Laboratory. Candidate receiving sites included the Idaho National Engineering and Environmental Laboratory (INEEL), the Savannah River Site (SRS), Los Alamos National Laboratory (LANL), Oak Ridge (OR), and Hanford. At least 14 additional DOE sites having TRU waste may be able to save significant money if cost savings are similar to the four evaluated thus far.

D. Luke; D. Parker; J. Moss; T. Monk (INEEL); L. Fritz (DOE-ID); B. Daugherty (SRS); K. Hladek (WM Federal Services Hanford); S. Kosiewicx (LANL)

2000-02-27T23:59:59.000Z

144

A Little Here, A Little There, A Fairly Big Problem Everywhere: Small Quantity Site Transuranic Waste Disposition Alternatives  

SciTech Connect (OSTI)

Small quantities of transuranic (TRU) waste represent a significant challenge to the waste disposition and facility closure plans of several sites in the Department of Energy (DOE) complex. This paper presents the results of a series of evaluations, using a systems engineering approach, to identify the preferred alternative for dispositioning TRU waste from small quantity sites (SQSs). The TRU waste disposition alternatives evaluation used semi-quantitative data provided by the SQSs, potential receiving sites, and the Waste Isolation Pilot Plant (WIPP) to select and recommend candidate sites for waste receipt, interim storage, processing, and preparation for final disposition of contact-handled (CH) and remote-handled (RH) TRU waste. The evaluations of only four of these SQSs resulted in potential savings to the taxpayer of $33 million to $81 million, depending on whether mobile systems could be used to characterize, package, and certify the waste or whether each site would be required to perform this work. Small quantity shipping sites included in the evaluation included the Battelle Columbus Laboratory (BCL), University of Missouri Research Reactor (MURR), Energy Technology Engineering Center (ETEC), and Mound. Candidate receiving sites included the Idaho National Engineering and Environmental Laboratory (INEEL), the Savannah River Site (SRS), Los Alamos National Laboratory (LANL), Oak Ridge (OR), and Hanford. At least 14 additional DOE sites having TRU waste may be able to save significant money if cost savings are similar to the four evaluated thus far.

Luke, Dale Elden; Parker, Douglas Wayne; Moss, J.; Monk, Thomas Hugh; Fritz, Lori Lee; Daugherty, B.; Hladek, K.; Kosiewicx, S.

2000-03-01T23:59:59.000Z

145

The Effect of SEC Enforcement Actions and Class Action Lawsuits on Peer Jared Jennings  

E-Print Network [OSTI]

environment in the U.S. is the prevalence of private class action lawsuits. In this paper, we investigateThe Effect of SEC Enforcement Actions and Class Action Lawsuits on Peer Firms Jared Jennings the SEC to deter potential miscreants via its enforcement actions against firms that indulge in fraudulent

Lin, Xiaodong

146

Numerical Tests of the Improved Fermilab Action  

E-Print Network [OSTI]

Recently, the Fermilab heavy-quark action was extended to include dimension-six and -seven operators in order to reduce the discretization errors. In this talk, we present results of the first numerical simulations with this action (the OK action), where we study the masses of the quarkonium and heavy-light systems. We calculate combinations of masses designed to test improvement and compare results obtained with the OK action to their counterparts obtained with the clover action. Our preliminary results show a clear improvement.

C. Detar; A. S. Kronfeld; M. B. Oktay

2010-11-23T23:59:59.000Z

147

Practical Action | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoadingPenobscot County, Maine:Plug Power IncPowder River EnergyCubePractical Action Jump to:

148

Dynamo action in flows with  

E-Print Network [OSTI]

Dynamo action in flows with cat's eyes A l i c e C o u r v o i s i e r A n d r e w G i l b e r t Y of k for R = 500 and the flow (2.4) and (2.5). nts k = 2.5 and k = 5 are highlighted. Magnetic field). In (a) k = 2.5 and we have 0.5 max Bz (with max Bz 0.6 max |B|), and in (b) k = 5 and the levels .65 max

Li, Yi

149

Affine and degenerate affine BMW algebras: Actions on tensor space  

E-Print Network [OSTI]

Affine and degenerate affine BMW algebras: Actions on tensor space Zajj Daugherty Department Actions of classical type tantalizers 8 2.1 The degenerate affine BMW algebra action . . . . . . . . . . . . . . . . . . . . . 13 2.2 The affine BMW algebra action . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 3

Ram, Arun

150

Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, Rev. No.: 0 with ROTC 1  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada, U.S. Department of Energy, and the U.S. Department of Defense. The general purpose of the investigation is to ensure adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select viable corrective actions. This Corrective Action Investigation Plan provides investigative details for CAU 511, whereas programmatic aspects of this project are discussed in the ''Project Management Plan'' (DOE/NV, 1994). General field and laboratory quality assurance and quality control issues are presented in the ''Industrial Sites Quality Assurance Project Plan'' (NNSA/NV, 2002). Health and safety aspects of the project are documented in the current version of the Environmental Engineering Services Contractor's Health and Safety Plan and will be supplemented with a site-specific safety basis document. Corrective Action Unit 511 is comprised of the following nine corrective action sites in Nevada Test Site Areas 3, 4, 6, 7, 18, and 19: (1) 03-08-02, Waste Dump (Piles & Debris); (2) 03-99-11, Waste Dump (Piles); (3) 03-99-12, Waste Dump (Piles & Debris); (4) 04-99-04, Contaminated Trench/Berm; (5) 06-16-01, Waste Dump (Piles & Debris); (6) 06-17-02, Scattered Ordnance/Automatic Weapons Range; (7) 07-08-01, Contaminated Mound; (8) 18-99-10, Ammunition Dump; and (9) 19-19-03, Waste Dump (Piles & Debris). Corrective Action Sites 18-99-10 and 19-19-03 were identified after a review of the ''1992 RCRA Part B Permit Application for Waste Management Activities at the Nevada Test Site, Volume IV, Section L Potential Solid Waste Management Unit'' (DOE/NV, 1992). The remaining seven sites were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada Test Site Inventory of Inactive and Abandoned Facilities and Waste Sites''. The seven-step data quality objectives (DQO) process was used to identify and define the type, quantity, and quality of data needed to complete the investigation phase of the corrective action process. The DQOs address the primary problem that sufficient information is not available to determine the appropriate corrective action for the CASs. Corrective action closure alternatives (i.e., no further action, close in place, or clean closure) will be recommended for CAU 511 based on an evaluation of all the DQO required data. Under the ''Federal Facility Agreement and Consent Order'', the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives that will be presented in the Corrective Action Decision Document.

David A. Strand

2004-08-01T23:59:59.000Z

151

Lawrence Berkeley Laboratory Affirmative Action Program. Revised  

SciTech Connect (OSTI)

The Lawrence Berkeley Laboratory`s Affirmative Action Program (AAP) serves as a working document that describes current policies, practices, and results in the area of affirmative action. It represents the Laboratory`s framework for an affirmative approach to increasing the representation of people of color and women in segments of our work force where they have been underrepresented and taking action to increase the employment of persons with disabilities and special disabled and Vietnam era veterans. The AAP describes the hierarchy of responsibility for Laboratory affirmative action, the mechanisms that exist for full Laboratory participation in the AAP, the policies and procedures governing recruitment at all levels, the Laboratory`s plan for monitoring, reporting, and evaluating affirmative action progress, and a description of special affirmative action programs and plans the Laboratory has used and will use in its efforts to increase the representation and retention of groups historically underrepresented in our work force.

NONE

1995-06-01T23:59:59.000Z

152

A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes  

SciTech Connect (OSTI)

This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

Not Available

1994-02-01T23:59:59.000Z

153

Categorical Exclusion Determination Form Proposed Action Title...  

Broader source: Energy.gov (indexed) [DOE]

CountyState): TVN Systems, Inc. (Lawrence, KS); Vanderbilt University (Nashville, TN); University of Kansas (Lawrence, KS) Proposed Action Description: Funding will support...

154

Categorical Exclusion Determination Form Proposed Action Title...  

Broader source: Energy.gov (indexed) [DOE]

LocationCs) CCityCountyState): Bosch RTC (Palo Alto, CA); Cobasys, LLC (Orion, MI); University of California - San Diego (San Diego, CA) Proposed Action Description: Funding...

155

Categorical Exclusion Determination Form Proposed Action Title...  

Broader source: Energy.gov (indexed) [DOE]

Projects Agency - Energy LocationCs) CCityCountyState): Niskayuna, NY; Ann Arbor, MI; Dearborn, MI Proposed Action Description: Funding will support efforts to develop a a...

156

Categorical Exclusion Determination Form Proposed Action Title...  

Broader source: Energy.gov (indexed) [DOE]

Research Projects Agency - Energy LocationCs) CCityCountyState): Dearborn, MI; Albuquerque, NM; College Station, TX Proposed Action Description: Funding will support...

157

Nuclear facility decommissioning and site remedial actions  

SciTech Connect (OSTI)

The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

1990-09-01T23:59:59.000Z

158

Definition of Small Gram Quantity Contents for Type B Radioactive Material Transportation Packages: Activity-Based Content Limitations  

SciTech Connect (OSTI)

Since the 1960's, the Department of Transportation Specification (DOT Spec) 6M packages have been used extensively for transportation of Type B quantities of radioactive materials between Department of Energy (DOE) facilities, laboratories, and productions sites. However, due to the advancement of packaging technology, the aging of the 6M packages, and variability in the quality of the packages, the DOT implemented a phased elimination of the 6M specification packages (and other DOT Spec packages) in favor of packages certified to meet federal performance requirements. DOT issued the final rule in the Federal Register on October 1, 2004 requiring that use of the DOT Specification 6M be discontinued as of October 1, 2008. A main driver for the change was the fact that the 6M specification packagings were not supported by a Safety Analysis Report for Packaging (SARP) that was compliant with Title 10 of the Code of Federal Regulations part 71 (10 CFR 71). Therefore, materials that would have historically been shipped in 6M packages are being identified as contents in Type B (and sometimes Type A fissile) package applications and addenda that are to be certified under the requirements of 10 CFR 71. The requirements in 10 CFR 71 include that the Safety Analysis Report for Packaging (SARP) must identify the maximum radioactivity of radioactive constituents and maximum quantities of fissile constituents (10 CFR 71.33(b)(1) and 10 CFR 71.33(b)(2)), and that the application (i.e., SARP submittal or SARP addendum) demonstrates that the external dose rate (due to the maximum radioactivity of radioactive constituents and maximum quantities of fissile constituents) on the surface of the packaging (i.e., package and contents) not exceed 200 mrem/hr (10 CFR 71.35(a), 10 CFR 71.47(a)). It has been proposed that a 'Small Gram Quantity' of radioactive material be defined, such that, when loaded in a transportation package, the dose rates at external points of an unshielded packaging not exceed the regulatory limits prescribed by 10 CFR 71 for non-exclusive shipments. The mass of each radioisotope presented in this paper is limited by the radiation dose rate on the external surface of the package, which per the regulatory limit should not exceed 200 mrem/hr. The results presented are a compendium of allowable masses of a variety of different isotopes (with varying impurity levels of beryllium in some of the actinide isotopes) that, when loaded in an unshielded packaging, do not result in an external dose rate on the surface of the package that exceeds 190 mrem/hr (190 mrem/hr was chosen to provide 5% conservatism relative to the regulatory limit). These mass limits define the term 'Small Gram Quantity' (SGQ) contents in the context of radioactive material transportation packages. The term SGQ is isotope-specific and pertains to contents in radioactive material transportation packages that do not require shielding and still satisfy the external dose rate requirements. Since these calculated mass limits are for contents without shielding, they are conservative for packaging materials that provide some limited shielding or if the contents are placed into a shielded package. The isotopes presented in this paper were chosen as the isotopes that Department of Energy (DOE) sites most likely need to ship. Other more rarely shipped isotopes, along with industrial and medical isotopes, are planned to be included in subsequent extensions of this work.

Sitaraman, S; Kim, S; Biswas, D; Hafner, R; Anderson, B

2010-10-27T23:59:59.000Z

159

CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 300: SURFACE RELEASE AREAS NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 300 CADD.

NONE

2006-07-01T23:59:59.000Z

160

Environmental Activism as Collective Action Key words: Environmental activism, environmental behavior, collective action,  

E-Print Network [OSTI]

Environmental Activism as Collective Action Key words: Environmental activism, environmental behavior, collective action, environmentalism, collective interest model. Mark Lubell Department The literature on environmental activism has failed to produce a model of individual decision- making explicitly

Lubell, Mark

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Robotic actions in the human brain Robotic movement preferentially engages the action observation network  

E-Print Network [OSTI]

Robotic actions in the human brain 1 Robotic movement., Stadler, W. & Prinz, W. (in press / 2011). Robotic movement preferentially engages the action observation network. Human Brain Mapping. #12;Robotic

Hamilton, Antonia

162

CLIMATE ACTION PLAN NOVEMBER 10, 2009  

E-Print Network [OSTI]

CLIMATE ACTION PLAN NOVEMBER 10, 2009 SANDY DEJOHN PHYSICAL FACILITIES DEPARTMENT #12;~ i ~ TABLE the American College and University Presidents Climate Commitment, I believe strongly in working to achieve its helped shape and develop the information contained in this Climate Action Plan: (Names listed

Suzuki, Masatsugu

163

Practical evaluation of action-angle variables  

SciTech Connect (OSTI)

A practical method is described for establishing action-angle variables for a Hamiltonian system. That is, a given nearly integrable Hamiltonian is divided into an exactly integrable system plus a perturbation in action-angle form. The transformation of variables, which is carried out using a few short trajectory integrations, permits a rapid determination of trajectory properties throughout a phase space volume.

Boozer, A.H.

1984-02-01T23:59:59.000Z

164

Action Requested: THE UNIVERSITY OF MICHIGAN  

E-Print Network [OSTI]

Subject: Action Requested: THE UNIVERSITY OF MICHIGAN REGENTS COMMUNICATION ACTION REQUEST schools and Michigan middle or junior high schools and matriculation at the University within 28 months President for Academic Affairs July 2013 Attachment #12;UNIVERSITY OF MICHIGAN GUIDELINES FOR QUALIFYING

Kamat, Vineet R.

165

Nordic H2 Energy Foresight Action Report  

E-Print Network [OSTI]

Nordic H2 Energy Foresight Action Report Annele Eerola Nordic Hydrogen Energy Foresight www.h2.): The Action Report is one of the intermediate outputs of the Nordic H2 Energy Foresight project. It pools. The report discusses these generic and specific challenges concerning the entire hydrogen energy value chain

166

Patent Issued Additional Office Actions Received  

E-Print Network [OSTI]

Patent Issued Additional Office Actions Received 3-12 mo. Respond to Office Action Patent attorney The patent examiner provides notification of which claims in the application have been rejected or accepted determines there are multiple inventions in 1 application. Patent Application Published 6 mo. Non

Cui, Yan

167

University of Kentucky Affirmative Action Plan  

E-Print Network [OSTI]

University of Kentucky Affirmative Action Plan Office of Institutional Equity and Equal Opportunity University of Kentucky Room 13 Main Building Administration Drive Lexington, Kentucky 40506-0032 (859) 257 as a revision of the University of Kentucky Affirmative Action Plan first issued in 1968. It supercedes all

Hayes, Jane E.

168

World Volume Action for Fractional Branes  

E-Print Network [OSTI]

We study the world volume action of fractional Dp-branes of type IIA string theory compactified on the orbifold T^4/Z_2. The geometric relation between these branes and wrapped branes is investigated using conformal techniques. In particular we examine in detail various scattering amplitudes and find that the leading low-energy interactions are consistent with the boundary action derived geometrically.

Merlatti, P

2001-01-01T23:59:59.000Z

169

World Volume Action for Fractional Branes  

E-Print Network [OSTI]

We study the world volume action of fractional Dp-branes of type IIA string theory compactified on the orbifold T^4/Z_2. The geometric relation between these branes and wrapped branes is investigated using conformal techniques. In particular we examine in detail various scattering amplitudes and find that the leading low-energy interactions are consistent with the boundary action derived geometrically.

P. Merlatti; G. Sabella

2001-01-11T23:59:59.000Z

170

Oil Quantity : The histori  

E-Print Network [OSTI]

Reserves Rem 10% 20% 30% 40% 50% 60% 70% serves Remain Decr Well T O B E nd Alaska's oduction rate (Q: initial pro 1... 2... 3... 3504 3003 2503 2002 1502 1001 5010 050 0 10 20 30 40 50 60 70 80 90 100 1 and from 0 m production analysis for e and withou 30% 40% 50% 60% 70% 80% 90% Reserves R 1995 200 total

Lin, C.-Y. Cynthia

171

Quantity | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: EnergyPotentialUrbanUtilityScalePVCapacityPulaski County, Kentucky:County, Georgia: Energy79.tracer test

172

SHIELDING AND DETECTOR RESPONSE CALCULATIONS PERTAINING TO CATEGORY 1 QUANTITIES OF PLUTONIUM AND HAND-HELD PLASTIC SCINTILLATORS  

SciTech Connect (OSTI)

Nuclear facilities sometimes use hand-held plastic scintillator detectors to detect attempts to divert special nuclear material in situations where portal monitors are impractical. MCNP calculations have been performed to determine the neutron and gamma radiation field arising from a Category I quantity of weapons-grade plutonium in various shielding configurations. The shields considered were composed of combinations of lead and high-density polyethylene such that the mass of the plutonium plus shield was 22.7 kilograms. Monte-Carlo techniques were also used to determine the detector response to each of the shielding configurations. The detector response calculations were verified using field measurements of high-, medium-, and low- energy gamma-ray sources as well as a Cf-252 neutron source.

Couture, A.

2013-06-07T23:59:59.000Z

173

Oil and gas: Oilfield class actions  

SciTech Connect (OSTI)

The use of class actions is getting alot of attention in the oilfield. Plaintiffs have filed class actions challenging two of the most rooted industry practices, oil posted prices and deregulated natural gas affiliate deduction and charges. The classes will include tens or hundreds of thousands of plaintiffs and may transform two of the industry`s most settled practices. The emotions surrounding the class action risk obscuring the fact that it is an old and oft-used tool in oilfield litigation. The class action {open_quotes}provides a means by which, where a large group of persons are interested in a matter, one or more may sue or be sued as representatives of the class without needing to join every member of the class.{close_quotes} The procedure avoids waste by combining scattered disputes, even if some injured might sue individually, and it enables plaintiffs who could not afford to sue to be represented anyway. The lawyers draw their fees from any recovery. Almost all oilpatch class actions are brought to resolve a {open_quotes}common question{close_quotes} under Federal Rules of Civil Procedure 23(b)(3) or state counterparts. The rule`s {open_quotes}opt-out{close_quotes} provisions give class actions a tremendous boost because members stay in unless they take steps to get out. This article discusses present and future class actions.

McArthur, J.B.

1997-06-01T23:59:59.000Z

174

Bishop's University Energy Efficiency Action Plan  

E-Print Network [OSTI]

. Continuous basis Action 9: Sustainable Development standards for existing buildings. Go green certification from BOMA for existing buildings Bishop's University Sustainable Development policy (ELU Committee January 2008 Government of Quebec, energy strategy, May 2006 Sustainable Development law, 2006 Letter

175

Climate Action Plan (Nova Scotia, Canada)  

Broader source: Energy.gov [DOE]

Nova Scotia's Climate Change Action Plan has two main goals: reducing the province's contribution to climate change by reducing greenhouse gas (GHG) emissions and preparing for changes to the...

176

Climate Action Plan (New Brunswick, Canada)  

Broader source: Energy.gov [DOE]

New Brunswick-led initiatives will result in greenhouse gas emission reductions of 5.5 megatonnes (millions of tonnes, Mt) annually in 2012. The plan includes actions in the following areas:...

177

ACTION SPECTRUM OF THE "SECOND EMERSON EFFECT"  

E-Print Network [OSTI]

at 670 mju in the action spectrum of the "second Emerson effect"' (22, 33), in the green alga Chlorella the fraction of total absorbed light absorbed by the accessory pigments (be it chlorophyll b in Chlorella

Govindjee

178

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...  

Broader source: Energy.gov (indexed) [DOE]

October 2011 Solar in Action Philadelphia was designated by the U.S. Department of Energy (DOE) on March 28, 2008, as Solar America City. At that time, the city presented a...

179

Categorical Exclusion (CX) Determination Proposed Action: Elliot...  

Broader source: Energy.gov (indexed) [DOE]

Elliot 115kV43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power)...

180

Fraud-on-the-Market Actions Against Foreign Issuers  

E-Print Network [OSTI]

13 2. Private Right of Action . . . . .can give rise to a private right of action by those damagedby the statement. 2. Private Right of Action Rule 10b-5 does

Fox, Merritt B.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Universality and ambiguity in fermionic effective actions  

E-Print Network [OSTI]

We discuss an ambiguity in the one-loop effective action of massive fields which takes place in massive fermionic theories. The universality of logarithmic UV divergences in different space-time dimensions leads to the non-universality of the finite part of effective action, which can be called the non-local multiplicative anomaly. The general criteria of existence of this phenomena are formulated and applied to fermionic operators with different external fields.

Guilherme de Berredo-Peixoto; Dante D. Pereira; Ilya L. Shapiro

2012-01-12T23:59:59.000Z

182

EXPERIENCE FROM TWO SMALL QUANTITY RH-TRU WASTE SITES IN NAVIGATING THROUGH AN EVOLVING REGULATORY LANDSCAPE  

SciTech Connect (OSTI)

Two small quantity transuranic (TRU) waste generator sites have gained considerable experience in navigating through a changing regulatory landscape in their efforts to remove the TRU waste from their sites and proceed with site remediation. The Battelle Columbus Laboratories Decommissioning Project (BCLDP) has the objectives of decontaminating nuclear research buildings and associated grounds and remediating to a level of residual contamination allowing future use without radiological restrictions. As directed by Congress, BCLDP must complete decontamination and decommissioning activities by the end of Fiscal Year (FY) 2006. This schedule requires the containerization of all TRU waste in 2002. BCLDP will generate a total of approximately 27 cubic meters (m3) of remote-handled (RH) TRU waste. Similarly, the Energy Technology Engineering Center (ETEC) is scheduled to close in 2006 pursuant to an agreement between the U.S. Department of Energy (DOE) and Boeing Canoga Park, the management and operating contractor for ETEC. ETEC had 11.0 m3 of RH-TRU and contact-handled (CH) TRU waste in storage, with the requirement to remove this waste in 2002 in order to meet their site closure schedule. The individual milestones for BCLDP and ETEC necessitated the establishment of site-specific programs to direct packaging and characterization of RH-TRU waste before the regulatory framework for the WIPP disposal of RH-TRU waste is finalized. The lack of large infrastructure for characterization activities, as well as the expedited schedules needed to meet regulatory milestones, provided both challenges and opportunities that are unique to small quantity sites. Both sites have developed unique programs for waste characterization based on the same premise, which directs comprehensive waste data collection efforts such that additional characterization will not be required following the finalization of the WIPP RH-TRU waste program requirements. This paper details the BCLDP program evolution in terms of strategy, innovative solutions to waste characterization, and development of alternative transportation options. Preliminary indications from various regulatory and oversight agencies and professional organizations are that the BCLDP RH-TRU waste characterization program is the ''model WIPP certification program'' and will satisfy anticipated regulatory expectations. This paper also summarizes how BCLDP lessons learned and their development of new resources were applied to the RH-TRU waste characterization and disposition program at ETEC.

Biedscheid, Jennifer; Devarakonda, Murthy; Eide, Jim; Kneff, Dennis

2003-02-27T23:59:59.000Z

183

Nuclear facility decommissioning and site remedial actions  

SciTech Connect (OSTI)

The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

1989-09-01T23:59:59.000Z

184

Berkeley, California: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Berkeley, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Berkeley, California: Solar in Action (Brochure), Solar America...

185

Tucson, Arizona: Solar in Action (Brochure), Solar America Cities...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Tucson, Arizona: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Tucson, Arizona: Solar in Action (Brochure), Solar America Cities,...

186

Austin, Texas: Solar in Action (Brochure), Solar America Cities...  

Broader source: Energy.gov (indexed) [DOE]

Austin, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Austin, Texas: Solar in Action (Brochure), Solar America Cities, Energy...

187

Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar America...  

Energy Savers [EERE]

Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar...

188

Seattle, Washington: Solar in Action (Brochure), Solar America...  

Broader source: Energy.gov (indexed) [DOE]

Seattle, Washington: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Seattle, Washington: Solar in Action (Brochure), Solar America...

189

Knoxville, Tennessee: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Knoxville, Tennessee: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Knoxville, Tennessee: Solar in Action (Brochure), Solar America...

190

Transcript of See Action and Technical Assistance Program Webcast...  

Broader source: Energy.gov (indexed) [DOE]

Transcript of See Action and Technical Assistance Program Webcast: Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Transcript of See Action and...

191

Clean Energy Action Star Governor Schwarzenegger to Keynote ARPA...  

Broader source: Energy.gov (indexed) [DOE]

Action Star Governor Schwarzenegger to Keynote ARPA-E Energy Innovation Summit Clean Energy Action Star Governor Schwarzenegger to Keynote ARPA-E Energy Innovation Summit February...

192

Energy Department Actions to Deploy Combined Heat and Power,...  

Broader source: Energy.gov (indexed) [DOE]

Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency October 21, 2013 -...

193

Tonopah Test Range Environmental Restoration Corrective Action Sites  

SciTech Connect (OSTI)

This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites and Corrective Action Units at the Tonopah Test Range

NSTec Environmental Restoration

2010-08-04T23:59:59.000Z

194

PIA - Savannah River Operations Office Executive Commitment Action...  

Energy Savers [EERE]

Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations...

195

Policy and Procedures for the Review of Federal Actions Impacting...  

Broader source: Energy.gov (indexed) [DOE]

Policy and Procedures for the Review of Federal Actions Impacting the Environment Policy and Procedures for the Review of Federal Actions Impacting the Environment This manual...

196

CHP: A Technical & Economic Compliance Strategy - SEE Action...  

Broader source: Energy.gov (indexed) [DOE]

CHP: A Technical & Economic Compliance Strategy - SEE Action Webinar, January 2012 CHP: A Technical & Economic Compliance Strategy - SEE Action Webinar, January 2012 This...

197

Two Tribes Recognized as Climate Action Champions During White...  

Office of Environmental Management (EM)

Two Tribes Recognized as Climate Action Champions During White House Tribal Nations Conference Two Tribes Recognized as Climate Action Champions During White House Tribal Nations...

198

Implementation Proposal for the National Action Plan on Demand...  

Broader source: Energy.gov (indexed) [DOE]

and the Department of Energy. Implementation Proposal for the National Action Plan on Demand Response - July 2011 More Documents & Publications National Action Plan on Demand...

199

United States and Japan Sign Joint Nuclear Energy Action Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy...

200

Energy Literacy in Action: Nevada Teachers Helping Students Learn...  

Office of Environmental Management (EM)

Literacy in Action: Nevada Teachers Helping Students Learn About Energy Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy November 6, 2014 - 10:48am...

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Root Cause Analysis (RCA) & Corrective Action Plan (CAP) | Department...  

Energy Savers [EERE]

Root Cause Analysis (RCA) & Corrective Action Plan (CAP) Root Cause Analysis (RCA) & Corrective Action Plan (CAP) Improving the Department of Energy's project and contract...

202

Implement an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from...

203

Develop an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine...

204

San Antonio, Texas: Solar in Action (Brochure), Solar America...  

Energy Savers [EERE]

San Antonio, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Antonio, Texas: Solar in Action (Brochure), Solar America...

205

Denver, Colorado: Solar in Action (Brochure), Solar America Cities...  

Energy Savers [EERE]

Denver, Colorado: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Denver, Colorado: Solar in Action (Brochure), Solar America Cities,...

206

Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America...  

Energy Savers [EERE]

Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America...

207

San Diego, California: Solar in Action (Brochure), Solar America...  

Broader source: Energy.gov (indexed) [DOE]

San Diego, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Diego, California: Solar in Action (Brochure), Solar...

208

San Francisco, California: Solar in Action (Brochure), Solar...  

Broader source: Energy.gov (indexed) [DOE]

San Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure),...

209

Portland, Oregon: Solar in Action (Brochure), Solar America Cities...  

Broader source: Energy.gov (indexed) [DOE]

Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency...

210

EAC Recommendations for DOE Action Regarding the Electricity...  

Energy Savers [EERE]

the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding...

211

Urgent Action on Energy Conservation Standards for Residential...  

Energy Savers [EERE]

Urgent Action on Energy Conservation Standards for Residential Water Heaters (Docket Number: EERE-2012-BT-STD-0022) Urgent Action on Energy Conservation Standards for Residential...

212

Ann Arbor, Michigan: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Ann Arbor, Michigan: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Ann Arbor, Michigan: Solar in Action (Brochure), Solar America...

213

Madison, Wisconsin: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Madison, Wisconsin: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Madison, Wisconsin: Solar in Action (Brochure), Solar America...

214

Chelation: A Fundamental Mechanism of Action of AGE Inhibitors...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mechanism of Action of AGE Inhibitors, AGE Breakers, and Other Inhibitors of Diabetes Complications. Chelation: A Fundamental Mechanism of Action of AGE Inhibitors, AGE...

215

actions internationales europeennes: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

are consistent with the boundary action derived geometrically. P. Merlatti; G. Sabella 2001-01-11 458 Scaling analysis of FLIC fermion actions HEP - Lattice (arXiv)...

216

antagonistic muscular actions: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

are consistent with the boundary action derived geometrically. P. Merlatti; G. Sabella 2001-01-11 468 Scaling analysis of FLIC fermion actions HEP - Lattice (arXiv)...

217

antipsychotic drug actions: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

are consistent with the boundary action derived geometrically. P. Merlatti; G. Sabella 2001-01-11 480 Scaling analysis of FLIC fermion actions HEP - Lattice (arXiv)...

218

action gainst staphylococcus: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

are consistent with the boundary action derived geometrically. P. Merlatti; G. Sabella 2001-01-11 417 Scaling analysis of FLIC fermion actions HEP - Lattice (arXiv)...

219

EAC Recommendations for DOE Action Regarding Consumer Acceptance...  

Energy Savers [EERE]

Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action...

220

Enforcement actions: Significant actions resolved material licensees. Semiannual progress report, July--December 1996  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during the period and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Enforcement actions: Significant actions resolved; Quarterly progress report, October--December 1993: Volume 12, No. 4  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1994-03-01T23:59:59.000Z

222

The Climate Change Action Plan: Technical supplement  

SciTech Connect (OSTI)

This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

Not Available

1994-03-01T23:59:59.000Z

223

ICDF Complex Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

224

An indirect sensing technique for diesel fuel quantity control. Technical progress report, October 1--December 31, 1998  

SciTech Connect (OSTI)

Work has proceeded intensely with the objective of completing the commercial prototype system prior to the end of the contract period. At the time of this report, testing and refinement of the commercial version of the system has not been completed. During this reporting period, several major milestones were reached and many significant lessons were learned. These are described. The experimental retrofit system has achieved all performance objectives in engine dynamometer tests. The prototype commercial version of the system will begin demonstration service on the first of several Santa Maria Area Transit (SMAT) transit buses on February 1, 1999. The commercial system has been redesignated the Electronic Diesel Smoke Reduction System (EDSRS) replacing the original internal pseudonym ADSC. The focus has been narrowed to a retrofit product suitable for installation on existing mechanically-governed diesel engines. Included in this potential market are almost all diesel-powered passenger cars and light trucks manufactured prior to the introduction of the most recent clean diesel engines equipped with particulate traps and electronic controls. Also included are heavy-duty trucks, transit vehicles, school buses, and agricultural equipment. This system is intended to prevent existing diesel engines from overfueling to the point of visible particulate emissions (smoke), while allowing maximum smoke-limited torque under all operating conditions. The system employs a microcontroller and a specialized exhaust particulate emission sensor to regulate the maximum allowable fuel quantity via an adaptive throttle-limit map. This map specifies a maximum allowable throttle position as a function of engine speed, turbocharger boost pressure and engine coolant temperature. The throttle position limit is mechanized via a servo actuator inserted in the throttle cable leading to the injection pump.

MacCarley, C.A.

1999-01-26T23:59:59.000Z

225

Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.

NSTec Environmental Restoration

2011-04-30T23:59:59.000Z

226

RCRA corrective action program guide (Interim)  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

Not Available

1993-05-01T23:59:59.000Z

227

GRIMHX verification and validation action matrix summary  

SciTech Connect (OSTI)

WSRC-RP-90-026, Certification Plan for Reactor Analysis Computer Codes, describes a series of action items to be completed for certification of reactor analysis computer codes used in Technical Specifications development and for other safety and production support calculations. Validation and verification of the code is an integral part of this process. This document identifies the work performed and documentation generated to satisfy these action items for the Reactor Physics computer code GRIMHX. Each action item is discussed with the justification for its completion. Specific details of the work performed are not included in this document but are found in the references. The publication of this document signals the validation and verification effort for the GRIMHX code is completed.

Trumble, E.F.

1991-12-01T23:59:59.000Z

228

Hamiltonian Analysis of $R + T^2$ Action  

E-Print Network [OSTI]

We study a gravitational action which is a linear combination of the Hilbert-Palatini term and a term quadratic in torsion and possessing local Poincare invariance. Although this action yields the same equations of motion as General Relativity, the detailed Hamiltonian analysis without gauge fixing reveals some new points never shown in the Hilbert-Palatini formalism. These include that an additional term containing torsion appears in the spatial diffeomorphism constraint and that the primary second-class constraints have to be imposed in a manner different from that in the Hilbert-Palatini case. These results may provide valuable lessons for further study of Hamiltonian systems with torsion.

Jian Yang; Kinjal Banerjee; Yongge Ma

2012-04-03T23:59:59.000Z

229

Summary Forest soils store an immense quantity of labile carbon (C) and a may be a large potential sink for atmos-  

E-Print Network [OSTI]

Summary Forest soils store an immense quantity of labile carbon (C) and a may be a large potential the same time period. Compared with control seedlings, total root biomass was 27% greater in fertilized toward the end of the study were a result of increased respiring root biomass. We conclude that fertiliza

Dyer, Rodney J.

230

texas water resources institute Water management is one of the most significant challenges facing Texas today. Major water quantity and water quality  

E-Print Network [OSTI]

texas water resources institute Water management is one of the most significant challenges facing Texas today. Major water quantity and water quality problems exist, affecting the environment and economy. Texas needs solutions. At the Texas Water Resources Institute, we help solve these pressing water

231

Science Maps in Action Dr. Katy Brner  

E-Print Network [OSTI]

Science Maps in Action Dr. Katy Börner Cyberinfrastructure for Network Science Center, Director Information Visualization Laboratory, Director School of Library and Information Science Indiana University Computational Scientometrics: Studying Science by Scientific Means Börner, Katy, Chen, Chaomei, and Boyack

Menczer, Filippo

232

FTCP Corrective Action Plan- Revision 1  

Broader source: Energy.gov [DOE]

January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

233

FIRE Project Action Plan in Response to  

E-Print Network [OSTI]

. The project should review other mission statements from the Office of Science in order to understand better, the Next Generation Space Telescope, etc. The project will also solicit input from the science community1 FIRE Project Action Plan in Response to Next Step Options Program Advisory Committee Report (PAC1

234

University at Buffalo Climate Action Plan  

E-Print Network [OSTI]

......................................................................................................... 3-26 3.5 Cumulative Reduction in UB's Carbon Footprint.......................................... 3)....................................................................... 1-5 2 UB's Greenhouse Gas Footprint..............................................2-1 2.1 Technical-9 2.4 The Impact of Campus Growth on UB's GHG Footprint.............................. 2-11 3 Actions

Oh, Kwang W.

235

Princeton University Outdoor Action Sustainability Guide  

E-Print Network [OSTI]

Princeton University Outdoor Action Sustainability Guide #12;Over the past thirty-five years students in the outdoors and how to facilitate team building and positive group interaction. In addition Itinerary ·Defining sustainability ·Princeton's Sustainability Plan ·Focus: fresh water and climate change

236

Action/Reason Code Applies To  

E-Print Network [OSTI]

9/28/2001 PAF Action/Reason Code Applies To: Business Unit Explanation ADL-Additional Job All Used to add a concurrent/additional job in the system APC-Appointment End Date ChanAll Used to change or payment terms CPR-Correction to pay rate All Used to correct a payrate FTE-FTE change All Used to indicate

Karonis, Nicholas T.

237

Draft Action Plan for the Comprehensive  

E-Print Network [OSTI]

benchmarking tools, upgrades to small and medium commercial buildings, upgrades to public buildings, inclusion CA| Draft Action Plan for the Comprehensive Energy Efficiency Program for Existing Buildings Buildings of 2009 (Assembly Bill 758, Skinner, Chapter 470, Statutes of 2009) anticipates the evolution

238

Enforcement actions: Significant actions resolved. Quarterly progress report, April--June 1993: Volume 12, No. 2  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

Not Available

1993-09-01T23:59:59.000Z

239

The SUN Action database : collecting and analyzing typical actions for visual scene types  

E-Print Network [OSTI]

Recent work in human and machine vision has increasingly focused on the problem of scene recognition. Scene types are largely defined by the actions one might typically do there: an office is a place someone would typically ...

Olsson, Catherine Anne White

2013-01-01T23:59:59.000Z

240

CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 536: AREA 3 RELEASE SITE, NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

CAU 536 consists of CAS 03-44-02, Steam Jenny Discharge, located in Area 3 of the NTS. The site was characterized in 2004 according to the approved CAIP and the site characterization results are reported in the CAU 536 CADD. The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 536 CADD.

NONE

2005-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Corrective Action Investigation Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, with Errata Sheet, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: 03-04-02, Area 3 Subdock Septic Tank 03-59-05, Area 3 Subdock Cesspool 12-59-01, Drilling/Welding Shop Septic Tanks 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.

Alfred Wickline

2007-01-01T23:59:59.000Z

242

Topological susceptibility with the improved Asqtad action  

SciTech Connect (OSTI)

As a test of the chiral properties of the improved Asqtad (staggered fermion) action, we have been measuring the topological susceptibility as a function of quark masses for 2 + 1 dynamical flavors. We report preliminary results, which show reasonable agreement with leading order chiral perturbation theory for lattice spacing less than 0.1 fm. The total topological charge, however, shows strong persistence over Monte Carlo time.

C. Bernard et al.

2004-01-06T23:59:59.000Z

243

Action and Inaction Levels in Pest Management.  

E-Print Network [OSTI]

1984 Action and Inaction Levels in Pest Management Winfield Sterling Department of Entomology Texas A&M University and The Texas Agricultural Experiment Station College Station, Texas 77843 Contents Introduction... of pests does the maintenance of pests below economic (112). The term inaction level for the density of enemies sufficient to maintain the pests below level is suggested (29). McDaniel & Sterling an example of an inaction level. They a ratio of one...

Sterling, Winfield

1984-01-01T23:59:59.000Z

244

A Brief Look At Affirmative Action  

E-Print Network [OSTI]

-versed of his legal rights, and does not need further instruction regarding his rights during the interview. If I provide a formal statement of his rights, I receive many comments regarding my disclosure statement and reduced participation from... generation ago- and did not emerge serendipitously" (Shaw 2003). Despite deliberate efforts to address racial inequality, the results have been mixed. In 1961, President John F. Kennedy first introduced the term Affirmative Action as a means...

Erickson, Nancy Jo

2007-12-06T23:59:59.000Z

245

Inductive Corrections of Action Descriptions Marcello Balduccini  

E-Print Network [OSTI]

description AD is a set of dynamic laws and state constraints1 . A recorded history up to step cT, Hc, its head holds. 1. h(L, T) s law(W), head(W, L), prec h(W, T). % If the preconditions hold and the action occurred, the head holds at the next step. 2. h(L, T + 1) d law(W), head(W, L), prec h(W, T

Zhang, Yuanlin

246

Solar Action Webinar Series | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScoping Study | DepartmentofDepartmentSolar Action

247

Presidential Climate Action Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoadingPenobscot County, Maine:Plug Power IncPowderClimate Action Project Jump to: navigation,

248

Climate Action Planning Tool | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhioOglesby,Sullivan, MissouriWebsterElectric CoopClearWorldAction Planning

249

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhioOglesby,Sullivan, MissouriWebsterElectric CoopClearWorldAction

250

Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: #2; CAS 03-04-02, Area 3 Subdock Septic Tank #2; CAS 03-59-05, Area 3 Subdock Cesspool #2; CAS 12-59-01, Drilling/Welding Shop Septic Tanks #2; CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. #2; CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. #2; CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. #2; CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. #2; CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.

NSTec Environmental Restoration

2009-03-31T23:59:59.000Z

251

Clean slate corrective action investigation plan  

SciTech Connect (OSTI)

The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

NONE

1996-05-01T23:59:59.000Z

252

Action-Oriented Benchmarking: Concepts and Tools  

SciTech Connect (OSTI)

Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article--Part 1 of a two-part series--we describe an 'action-oriented benchmarking' approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful metrics and to identify, screen and prioritize potential efficiency improvements. This opportunity assessment process can then be used to inform and optimize a full-scale audit or commissioning process. We introduce a new web-based action-oriented benchmarking system and associated software tool-EnergyIQ. The benchmarking methods, visualizations, and user interface design are informed by an end-user needs assessment survey and best-practice guidelines from ASHRAE.

California Energy Commission; Mathew, Paul; Mills, Evan; Mathew, Paul; Piette, Mary Ann; Bourassa, Norman; Brook, Martha

2008-02-13T23:59:59.000Z

253

N Springs expedited response action proposal  

SciTech Connect (OSTI)

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

254

Water quantity and quality model for the evaluation of water-management strategies in the Netherlands: application to the province of Friesland  

SciTech Connect (OSTI)

The Netherlands have a rather complex water-management system consisting of a number of major rivers, canals, lakes and ditches. Water-quantity management on a regional scale is necessary for an effective water-quality policy. To support water management, a computer model was developed that includes both water quality and water quantity, based on three submodels: ABOPOL for the water movement, DELWAQ for the calculation of water quality variables and BLOOM-II for the phytoplankton growth. The northern province of Friesland was chosen as a test case for the integrated model to be developed, where water quality is highly related to the water distribution and the main trade-off is minimizing the intake of (eutrophicated) alien water in order to minimize external nutrient load and maximizing the intake in order to flush channels and lakes. The results of the application of these models to this and to a number of hypothetical future situations are described.

Brinkman, J.J.; Griffioen, P.S.; Groot, S.; Los, F.J.

1987-03-01T23:59:59.000Z

255

Time series of high resolution photospheric spectra in a quiet region of the Sun. II. Analysis of the variation of physical quantities of granular structures  

E-Print Network [OSTI]

From the inversion of a time series of high resolution slit spectrograms obtained from the quiet sun, the spatial and temporal distribution of the thermodynamical quantities and the vertical flow velocity is derived as a function of logarithmic optical depth and geometrical height. Spatial coherence and phase shift analyzes between temperature and vertical velocity depict the height variation of these physical quantities for structures of different size. An average granular cell model is presented, showing the granule-intergranular lane stratification of temperature, vertical velocity, gas pressure and density as a function of logarithmic optical depth and geometrical height. Studies of a specific small and a specific large granular cell complement these results. A strong decay of the temperature fluctuations with increasing height together with a less efficient penetration of smaller cells is revealed. The T -T coherence at all granular scales is broken already at log tau =-1 or z~170 km. At the layers beyon...

Puschmann, K G; Vazquez, M; Bonet, J A; Hanslmeier, A; 10.1051/0004-6361:20047193

2012-01-01T23:59:59.000Z

256

Virginia Tech Climate Action Commitment and Sustainability Plan  

E-Print Network [OSTI]

of Architecture & Urban Studies Angella De Soto * Undergraduate Student Sustainability Intern, Environmental 0 Virginia Tech Climate Action Commitment and Sustainability Plan Energy & Sustainability Committee April 22, 2009 #12; 1 ACKNOWLEDGEMENTS VIRGINIA TECH CLIMATE ACTION COMMITMENT

Buehrer, R. Michael

257

State and Local Energy Efficiency Action Network | Department...  

Office of Environmental Management (EM)

State and Local Energy Efficiency Action Network Graphic of logo of the State and Local Energy Efficiency (SEE) Action Network, which includes a green map of the United States...

258

action pharmacology effects: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on all fields of N4 vector multiplet. We also consider the derivation of leading low-enrgy effective action at two loops. I. L. Buchbinder 2004-02-12 112 An Effective Action for...

259

ACTION MEMO: Technical Position on the Use of National Consensus...  

Broader source: Energy.gov (indexed) [DOE]

ACTION MEMO: Technical Position on the Use of National Consensus and Building Codes to Meet DOE Order 420. I B. ACTION MEMO: Technical Position on the Use of National Consensus and...

260

ACTION: Technical Position on the Use of National Consensus and...  

Broader source: Energy.gov (indexed) [DOE]

ACTION: Technical Position on the Use of National Consensus and Building Codes to Meet DOE Order 420.18, Facility Safety, Albright, 91307 ACTION: Technical Position on the Use of...

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report...  

Office of Environmental Management (EM)

EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement EIS-0380: Fiscal Year 2011 Mitigation Action Plan...

262

Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

NSTec Environmental Restoration

2007-07-01T23:59:59.000Z

263

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

264

The application of the fusion method of thermit welding to small diameter tubing: An analysis of mold design and powder quantity.  

E-Print Network [OSTI]

of an exothermic reaction between iron oxide and aluminum, in the form of a finely powdered mixture. Produced in this reaction are steel, aluminum oxide, and a specific quantity of heat. In the early lgDD' s, the thermit process was used extensively... Pl ~ Glynn, who investigated another basic aspect of this problem. The science of aluminothermics involves the reduc- tion of a metallic oxide in the presence of aluminum. This reduction occurs in the form of an ebullient exothermic reaction...

Eller, Frank Charles

1972-01-01T23:59:59.000Z

265

TRPA1 Mediates the Inflammatory Actions of Environmental Irritants  

E-Print Network [OSTI]

by environmental irritants, such as acrolein, that account for toxic and inflammatory actions of tear gas, vehicle

Jordt, Sven-Eric

266

Boston Massachusetts: Solar in Action (Brochure), Solar America...  

Broader source: Energy.gov (indexed) [DOE]

Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency &...

267

opinion on the effects of that action on threatened and endangered species in accordance with section 7 of the ESA. Specifically, this biological opinion analyzes the effects of the  

E-Print Network [OSTI]

studies · Unpublished data: o International Whaling Commission o North Slope Borough o Alaska Eskimo to section 101(a)(5) of the MMPA covering "taking of marine mammals incidental to operations of offshore oil and importing marine mammals; taking marine mammals incidental to operation of offshore oil and gas facilities

268

U.S. OPEN DATA ACTION PLAN May 9, 2014  

E-Print Network [OSTI]

U.S. OPEN DATA ACTION PLAN May 9, 2014 #12;U.S. OPEN DATA ACTION PLAN 1 Licensing As a work.0 Universal Public Domain Dedication. #12;U.S. OPEN DATA ACTION PLAN 2 Introduction Throughout his, improve accountability, and fuel private sector innovation, scientific discovery, and economic growth

Schrijver, Karel

269

Single View Human Action Recognition using Key Pose Matching and Viterbi Path Searching  

E-Print Network [OSTI]

by a graph model called Action Net. Given the input, silhouette matching be- tween the input frames representation scheme called Action Net. Action Net is a graph model. Each node in the Action Net contains the 2D the essence of each action class even if there is variance in execution styles of the same action. The Action

Southern California, University of

270

Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: {sm_bullet} CAS 06-07-01, Decon Pad {sm_bullet} CAS 15-01-03, Aboveground Storage Tank {sm_bullet} CAS 15-04-01, Septic Tank {sm_bullet} CAS 15-05-01, Leachfield {sm_bullet} CAS 15-08-01, Liquid Manure Tank {sm_bullet} CAS 15-23-01, Underground Radioactive Material Area {sm_bullet} CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs.

NSTec Environmental Restoration

2006-09-01T23:59:59.000Z

271

CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 224: DECON PAD AND SEPTIC SYSTEMS NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 224 CADD.

NONE

2006-07-01T23:59:59.000Z

272

Radiological assessment and remedial action report for the ''Son of Lansdowne'' property, 186 North Lansdowne Avenue, Lansdowne, Pennsylvania  

SciTech Connect (OSTI)

This document reports the results of a radiological assessment and remedial action program conducted by Argonne National Laboratory personnel at a radioactively contaminated private residence in Lansdowne, Pennsylvania. The program was conducted on the residence at 186 Lansdowne Avenue. The survey conducted by the ANL personnel indicated that several dozen areas or spots of contamination were present on all floors and the basement of the three-story house. Contamination was found on furniture, carpeting, walls, floors, woodwork, and ceilings. Remedial action undertaken to remove the contamination ranged from scrubbing, to scraping, to shaving of wood, to removal and disposal of items and material that could not be adequately decontaminated. Outdoors, contaminated soil was removed from the backyard, and the driveway was dug up so the contaminated subsurface material could be removed. The remedial action generated quantities of radioactive waste, including four 55-gallon drums and one M-III bin (120 ft/sup 3/) containing floor tile, concrete, personal items, furniture, floor scrapings, vermiculite absorbed scrub water, and other items. In addition, there were 24 M-III bins containing approximately 112 tons of contaminated soil and rock from the two contaminated areas in the backyard and from the contaminated subsurface of the driveway. 2 refs., 39 figs., 12 tabs.

Smith, W.H.; Wynveen, R.A.

1987-08-01T23:59:59.000Z

273

Uranium Mill Tailings Remedial Action Project (UMTRAP), Slick Rock, Colorado, Revision 1, Volume 4. Calculations, Final design for construction  

SciTech Connect (OSTI)

Volume four contains calculations for: Borrow areas--site evaluation; temporary facilities--material quantities; embankment quantities--excavation and cover materials; Burro Canyon site excavation quantities--rippable and unrippable materials; site restoration--earthwork quantities and seeding; and bid schedule quantities and material balance.

NONE

1995-09-01T23:59:59.000Z

274

Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

Susan Evans

2004-11-01T23:59:59.000Z

275

The effective action in Coulomb gauge QCD  

E-Print Network [OSTI]

At 2-loop order, Feynman integrals in the Coulomb gauge are divergent over the internal energy variables. Nevertheless, it is known how to calculate the effective action provided that the external gluon fields are all transverse. We show that, for the two-gluon Greens function as an example, the method can be extended to include longitudinal external fields. The longitudinal Greens functions appear in the BRST identities. As an intermediate step, we use a flow gauge, which interpolates between the Feynman and Coulomb gauges.

A. Andrasi; J. C. Taylor

2015-03-29T23:59:59.000Z

276

Affirmative Action Plan, October 1991--September 1992  

SciTech Connect (OSTI)

This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

Not Available

1991-10-01T23:59:59.000Z

277

The effective action in Coulomb gauge QCD  

E-Print Network [OSTI]

At 2-loop order, Feynman integrals in the Coulomb gauge are divergent over the internal energy variables. Nevertheless, it is known how to calculate the effective action provided that the external gluon fields are all transverse. We show that, for the two-gluon Greens function as an example, the method can be extended to include longitudinal external fields. The longitudinal Greens functions appear in the BRST identities. As an intermediate step, we use a flow gauge, which interpolates between the Feynman and Coulomb gauges.

A. Andrasi; J. C. Taylor

2014-07-11T23:59:59.000Z

278

Group action in topos quantum physics  

SciTech Connect (OSTI)

Topos theory has been suggested first by Isham and Butterfield, and then by Isham and Doering, as an alternative mathematical structure within which to formulate physical theories. In particular, it has been used to reformulate standard quantum mechanics in such a way that a novel type of logic is used to represent propositions. In this paper, we extend this formulation to include the notion of a group and group transformation in such a way that we overcome the problem of twisted presheaves. In order to implement this we need to change the type of topos involved, so as to render the notion of continuity of the group action meaningful.

Flori, C. [Perimeter Institute for Theoretical Physics, 31 Caroline Street N, Waterloo, Ontario N2L 2Y5 (Canada)] [Perimeter Institute for Theoretical Physics, 31 Caroline Street N, Waterloo, Ontario N2L 2Y5 (Canada)

2013-03-15T23:59:59.000Z

279

Portsmouth Remedial Actions Documents | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiativesNationalNuclearRockyServicesFindings andRemedial Actions

280

Portsmouth Removal Actions | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiativesNationalNuclearRockyServicesFindings andRemedial ActionsRemoval

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Convection and dynamo action in B stars  

E-Print Network [OSTI]

Main-sequence massive stars possess convective cores that likely harbor strong dynamo action. To assess the role of core convection in building magnetic fields within these stars, we employ the 3-D anelastic spherical harmonic (ASH) code to model turbulent dynamics within a 10 solar mass main-sequence (MS) B-type star rotating at 4 times the solar rate. We find that strong (900 kG) magnetic fields arise within the turbulence of the core and penetrate into the stably stratified radiative zone. These fields exhibit complex, time-dependent behavior including reversals in magnetic polarity and shifts between which hemisphere dominates the total magnetic energy.

Augustson, Kyle C; Toomre, Juri

2010-01-01T23:59:59.000Z

282

Rainforest Action Network RAN | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant of Access Permit5-ID-aREC SolarRadium HotRail SplitterAction

283

and Action Steps for StatesEPA Clean Energy-Environment Guide to Action  

E-Print Network [OSTI]

This prepublication version of the Clean Energy-Environment Guide to Action has been provided to the public to facilitate timely access to the report's contents. Although the substance of the report is final, editorial changes may be made throughout the text, and citations will be checked

Policies Best Practices

2006-01-01T23:59:59.000Z

284

Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

David A. Strand

2004-10-01T23:59:59.000Z

285

Affirmative Action in Higher Education in India and the US: A Study in Contrasts  

E-Print Network [OSTI]

in India; and affirmative action policies, court verdicts,ACTION IN INDIA AND THE US policies of affirmative action,reservation policy as affirmative action in India. Of late,

Gupta, Asha

2006-01-01T23:59:59.000Z

286

Separable geodesic action slicing in stationary spacetimes  

E-Print Network [OSTI]

A simple observation about the action for geodesics in a stationary spacetime with separable geodesic equations leads to a natural class of slicings of that spacetime whose orthogonal geodesic trajectories represent freely falling observers. The time coordinate function can then be taken to be the observer proper time, leading to a unit lapse function. This explains some of the properties of the original Painlev\\'e-Gullstrand coordinates on the Schwarzschild spacetime and their generalization to the Kerr-Newman family of spacetimes, reproducible also locally for the G\\"odel spacetime. For the static spherically symmetric case the slicing can be chosen to be intrinsically flat with spherically symmetric geodesic observers, leaving all the gravitational field information in the shift vector field.

Donato Bini; Andrea Geralico; Robert T. Jantzen

2014-08-22T23:59:59.000Z

287

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment;

Tim Echelard

2006-03-01T23:59:59.000Z

288

Uranium Mill Tailings Remedial Action 1993 Roadmap  

SciTech Connect (OSTI)

The 1993 Roadmap for the Uranium Mill Tailings Remedial Action (UMTRA) Project office is a tool to assess and resolve issues. The US Department of Energy (DOE) UMTRA Project Office uses the nine-step roadmapping process as a basis for Surface and Groundwater Project planning. This is the second year the Roadmap document has been used to identify key issues and assumptions, develop logic diagrams, and outline milestones. This document is a key element of the DOE planning process. A multi-interest group used the nine-step process to focus on issues, root cause analysis and resolutions. This core group updated and incorporated comments on the basic assumptions, then used these assumptions to identify issues. The list of assumptions was categorized into the following areas: institutional, regulatory compliance, project management, human resource requirements, and other site-specific assumptions. The group identified 10 issues in the analysis phase. All of the issues are ranked according to importance. The number one issue from the 1992 Roadmap, ``Lack of sufficient human resources,`` remained the number one issue in 1993. The issues and their ranking are as follows: Lack of sufficient human resources; increasing regulatory requirements; unresolved groundwater issues; extension of UMTRCA through September 30, 1998; lack of post-UMTRA and post-cell closure policies; unpredictable amounts and timing of Federal funding; lack of regulatory compliance agreements; problem with states providing their share of remedial action costs; different interests and priorities among participants; and technology development/transfer. The issues are outlined and analyzed in detail in Section 8.0, with a schedule for resolution of these issues in Section 9.0.

Not Available

1993-10-18T23:59:59.000Z

289

Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada with ROTC1, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 560 is located in Areas 3 and 6 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 560 is comprised of the seven corrective action sites (CASs) listed below: 03-51-01, Leach Pit 06-04-02, Septic Tank 06-05-03, Leach Pit 06-05-04, Leach Bed 06-59-03, Building CP-400 Septic System 06-59-04, Office Trailer Complex Sewage Pond 06-59-05, Control Point Septic System These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 22, 2008, by representatives from the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 560.

Grant Evenson

2008-05-01T23:59:59.000Z

290

Corrective Action Investigation plan for Corrective Action Unit 546: Injection Well and Surface Releases, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 546 is located in Areas 6 and 9 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 546 is comprised of two Corrective Action Sites (CASs) listed below: 06-23-02, U-6a/Russet Testing Area 09-20-01, Injection Well These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 8, 2007, by representatives of the Nevada Division of Environmental Protection and U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process has been used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 546.

Alfred Wickline

2008-03-01T23:59:59.000Z

291

Uranium Mill Tailings Remedial Action Project 1993 Environmental Report  

SciTech Connect (OSTI)

This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

Not Available

1994-10-01T23:59:59.000Z

292

COP 18 Side Event: Advancing Collaborative Action for Low Emissions...  

Open Energy Info (EERE)

Event: Advancing Collaborative Action for Low Emissions Development Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing climate-resilient,...

293

Catalyzing Cooperative Action for Low Emissions Development Side...  

Open Energy Info (EERE)

Join Contact Bonn Event Agenda Presentations Catalyzing Cooperative Action for Low Emissions Development May 23, 2012 Bonn, Germany Dear Colleagues, We are delighted to invite...

294

Inventors in Action: Composites and Automation | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Composite Materials and Automation Inventors in Action: Composite Materials and Automation As our composite materials evolve, our manufacturing processes do too. A new class of...

295

EAC Recommendations for DOE Action on a Strategic Portable Generation...  

Broader source: Energy.gov (indexed) [DOE]

of maintaining continuous and reliable energy supplies for the United States through preventive measures, restoration and recovery actions. Additional information regarding...

296

EAC Recommendations for DOE Action Regarding Development of the...  

Broader source: Energy.gov (indexed) [DOE]

Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next...

297

action plan site: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

goals for research 155 Reconnaissance Soil Geochemistry at the Riverton Uranium Mill Tailings Remedial Action Site, Fremont Environmental Sciences and Ecology Websites...

298

action program sites: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

profoundly Calvanese, Diego 29 Reconnaissance Soil Geochemistry at the Riverton Uranium Mill Tailings Remedial Action Site, Fremont Environmental Sciences and Ecology Websites...

299

action future functioning: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and wide area situation awareness (SA) for all organizations in the power grid. This project addresses 8 Midbrain dopamine neurons encode decisions for future action Computer...

300

action project weldon: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a number of potentially contaminated areas, including seven unlined lagoons where 3 Action Learning Project Company Application Environmental Management and Restoration...

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Guidance on NEPA Review for Corrective Actions under the Resource...  

Broader source: Energy.gov (indexed) [DOE]

process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S...

302

Develop an Institutional Change Action Plan for Sustainability  

Broader source: Energy.gov [DOE]

After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular measurement. Remember that planning useful efficiency and sustainability evaluation is necessary before an organization begins to implement an action plan.

303

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...  

Energy Savers [EERE]

Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

304

administrative actions biologics: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Duane E. 99 Funneling auxin action: specificity in signal transduction Dolf Weijers1 Renewable Energy Websites Summary: determine the various auxin responses in development....

305

Unified Procedures Applicable to Major Federal Actions Relating...  

Broader source: Energy.gov (indexed) [DOE]

Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 44 Fed Reg 65560) Unified Procedures...

306

action document pantoea: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Requirements Page 1 Last Updated: 8302010 O:WebsiteSource DocumentsDegree AuditsocialworkMinorCommunity Action and Social Change.doc Campus: UMICH RG valid...

307

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSE'ITS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

308

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

309

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

310

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

311

Notice of Emergency Action - Emergency Order To Resume Limited...  

Broader source: Energy.gov (indexed) [DOE]

Emergency Action - Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in...

312

Knoxville, Tennessee: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies * Engaging Existing Industry to Promote Market Expansion * Allowing Solar Energy Systems in Historic Districts October 2011 Solar in Action The City of...

313

action potential propagation: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for action potential propagation in excitable cells CERN Preprints Summary: Speed of propagation of small-amplitude pressure waves through the cytoplasmic interior of...

314

Ecofys-Nationally Appropriate Mitigation Actions: Insights from...  

Open Energy Info (EERE)

Actions: Insights from Example Development1 "Ecofys elaborated in several projects, concrete examples of NAMAs to understand the issues arising from this concept. This report...

315

Effect of Nitrogen Additives on Flame Retardant Action of Tributyl...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of tributyl phosphate (TBP) has been investigated. From the LOI tests on treated cotton it is clear that the nitrogen additives have synergistic action. Estimation of...

316

actions resolved quarterly: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

gammall omegam. We demonstrate fluctuation back action cancellation in reflected wave. However, it does not allow to circumvent Standard Quantum Limit, the reason of it is...

317

Climate Action Champions Request for Applications Informational Webinar  

Office of Energy Efficiency and Renewable Energy (EERE)

This Webinar will provide prospective Applicants with an overview of the Climate Actions Champions Request for Applications, the application process and respond to questions posed by attendees.

318

Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy`s (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, {open_quotes}Corrective Action Strategy{close_quotes} (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles.

NONE

1997-11-01T23:59:59.000Z

319

Guide to ground water remediation at CERCLA response action and RCRA corrective action sites  

SciTech Connect (OSTI)

This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

NONE

1995-10-01T23:59:59.000Z

320

Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

David A. Strand

2004-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Learning 4D Action Feature Models for Arbitrary View Action Recognition Pingkun Yan, Saad M. Khan, Mubarak Shah  

E-Print Network [OSTI]

- teresting work is that of Lv et al. [11], where a graphical model called Action Net is built to connect 2D

Central Florida, University of

322

Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2004-04-06T23:59:59.000Z

323

Water Quantity | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS dataIndiana:CoopWaspa Jump to:Tricity

324

Microsoft Word - Small Quantity Exceptions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource Program Preliminary Needs Assessment MarchSelection One of the

325

Method for quantitative determination and separation of trace amounts of chemical elements in the presence of large quantities of other elements having the same atomic mass  

DOE Patents [OSTI]

Photoionization via autoionizing atomic levels combined with conventional mass spectroscopy provides a technique for quantitative analysis of trace quantities of chemical elements in the presence of much larger amounts of other elements with substantially the same atomic mass. Ytterbium samples smaller than 10 ng have been detected using an ArF* excimer laser which provides the atomic ions for a time-of-flight mass spectrometer. Elemental selectivity of greater than 5:1 with respect to lutetium impurity has been obtained. Autoionization via a single photon process permits greater photon utilization efficiency because of its greater absorption cross section than bound-free transitions, while maintaining sufficient spectroscopic structure to allow significant photoionization selectivity between different atomic species. Separation of atomic species from others of substantially the same atomic mass is also described.

Miller, C.M.; Nogar, N.S.

1982-09-02T23:59:59.000Z

326

Visioning 2050 BNL's Contribution to the NYS Climate Action Plan  

E-Print Network [OSTI]

and Energy Climate change: motivations for NYS action Some energy facts New York State Climate Action Plan, and storage Energy Strategy Focus: Discovery to Deployment CFN/Nanoscience NSLS II New York Blue Core Programs improvements of heating systems, biofuels - Building controls, energy management , etc. #12;#12;The New York

Homes, Christopher C.

327

FUTURE POWER GRID INITIATIVE Actionable Visualization Tools for  

E-Print Network [OSTI]

FUTURE POWER GRID INITIATIVE Actionable Visualization Tools for Power Grid Situation Awareness the fundamental need for greater SA through actionable visualization tools that: » increase the effectiveness to incorrect assumptions about events and even disastrous consequences. The tools developed in this project

328

Momentum Map and Action-Angle Variables for Nambu Dynamics  

E-Print Network [OSTI]

Momentum map is a reduction procedure that reduces the dimension of a Hamiltonian system to the lower ones. It is shown that behavior of the action-angle variables under the momentum map generates the new action-angle variables for the reduced system considered as a Nambu structure. The symmetrical top is given as an illustration.

A. Tegmen

2005-08-29T23:59:59.000Z

329

Chronological History of Federal Fleet Actions and Mandates (Brochure)  

SciTech Connect (OSTI)

This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

Not Available

2011-04-01T23:59:59.000Z

330

November 2013 ANALYSIS OF RAW ACTIONS ADDRESSING RFS  

E-Print Network [OSTI]

environmental resource areas for the proposed RAW actions associated with RFS contamination described in SectionNovember 2013 5-1 CHAPTER 5 ANALYSIS OF RAW ACTIONS ADDRESSING RFS CONTAMINATION This chapter discusses the environmental setting, impacts, and mitigation measures for the 14 fully evaluated

Lee, Jason R.

331

The Welsh Government's Action Plan for wild deer  

E-Print Network [OSTI]

The Welsh Government's Action Plan for wild deer management in Wales 2011 - 2016 www.cymru.gov.uk #12;2 Index Wild deer management in Wales action plan 2011 ­ 2016 Minister's Foreword ­ our approach to wild deer management. 5 4. Other Welsh Government strategies and policies which

332

SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning  

E-Print Network [OSTI]

Planning Tools from Morehead A Word about Morehead's Workforce Commitment Model Technical Support Section 2 Activities Appendices Appendix 1 ­ Workforce Commitment Domains Summary Appendix 2 ­ Action Plan Form #12SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help

Squire, Larry R.

333

Uranium Mill Tailings Remedial Action Project 1994 environmental report  

SciTech Connect (OSTI)

This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

NONE

1995-08-01T23:59:59.000Z

334

An action with positive kinetic energy term for general relativity  

E-Print Network [OSTI]

At first, we state some results in arXiv: 0707.2639, and then, using a positive kinetic energy coordinate condition given by arXiv: 0707.2639, we present an action with positive kinetic energy term for general relativity. Based on this action, the corresponding theory of canonical quantization is discussed.

T. Mei

2007-11-02T23:59:59.000Z

335

SEE Action Webinar on Energy Efficiency Measure Cost Studies  

Broader source: Energy.gov [DOE]

Presented by State and Local Energy Efficiency Action Network (SEE Action), this webinar will explain the importance of measure cost studies, review the current "state of the science" of measure cost development and estimation, and explore opportunities for future collaboration and advancement of measure cost research.

336

Progress in study of N=4 SYM effective action  

E-Print Network [OSTI]

We review the basic results concerning the structure of effective action in N=4 supersymmetric Yang-Mills theory in Coulomb phase. Various classical formulations of this theory are considered. We show that the low-energy effective action depending on all fileds of N=4 vector multiplet can be exactly found. This result is discussed on the base of algebraic analysis exploring the general harmonic superspace techniques and on the base of straightforward quantum field theory calculations using the N=2 supersymmetric background field method. We study the one-loop effective action beyond leading low-energy approximation and construct supersymmetric generalization of Heisenberg-Euler-Schwinger effective action depending on all fields of N=4 vector multiplet. We also consider the derivation of leading low-enrgy effective action at two loops.

I. L. Buchbinder

2004-02-12T23:59:59.000Z

337

Progress in study of N=4 SYM effective action  

E-Print Network [OSTI]

We review the basic results concerning the structure of effective action in N=4 supersymmetric Yang-Mills theory in Coulomb phase. Various classical formulations of this theory are considered. We show that the low-energy effective action depending on all fileds of N=4 vector multiplet can be exactly found. This result is discussed on the base of algebraic analysis exploring the general harmonic superspace techniques and on the base of straightforward quantum field theory calculations using the N=2 supersymmetric background field method. We study the one-loop effective action beyond leading low-energy approximation and construct supersymmetric generalization of Heisenberg-Euler-Schwinger effective action depending on all fields of N=4 vector multiplet. We also consider the derivation of leading low-enrgy effective action at two loops.

Buchbinder, I L

2004-01-01T23:59:59.000Z

338

emergency.cornell.edu Version 10 EMERGENCY ACTION GUIDE  

E-Print Network [OSTI]

involved, quantity, hazards and injuries. · When the incident occurred. · Your name, location and phone)255-1111. You may also use any outdoor Blue Light phone (situated throughout campus) or indoor designated to give: · Location of the emergency ­ building, room, directions. · Type and severity of the emergency. o

Pawlowski, Wojtek

339

Corrective Action Plan for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 151 consists of eight Corrective Action Sites (CASs) located in Areas 2, 12, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada.

NSTec Environmental Restoration

2007-03-01T23:59:59.000Z

340

Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: 18-22-05, Drum 18-22-06, Drums (20) 18-22-08, Drum 18-23-01, Danny Boy Contamination Area 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.

Patrick Matthews

2010-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Smart Buildings: Business Case and Action Plan  

SciTech Connect (OSTI)

General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

Ehrlich, Paul; Diamond, Rick

2009-04-01T23:59:59.000Z

342

Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 543: Liquid Disposal Units is listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO) which was agreed to by the state of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). CAU 543 sites are located in Areas 6 and 15 of the Nevada Test Site (NTS), which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven Corrective Action Sites (CASs) (Figure 1): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; and CAS 15-23-03, Contaminated Sump, Piping. All Area 15 CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm, which operated from 1963 to 1981 and was used to support animal experiments involving the uptake of radionuclides. Each of the Area 15 CASs, except CAS 15-23-01, is associated with the disposal of waste effluent from Building 15-06, which was the primary location of the various tests and experiments conducted onsite. Waste effluent disposal from Building 15-06 involved piping, sumps, outfalls, a septic tank with leachfield, underground storage tanks, and an aboveground storage tank (AST). CAS 15-23-01 was associated with decontamination activities of farm equipment potentially contaminated with radiological constituents, pesticides, and herbicides. While the building structures were removed before the investigation took place, all the original tanks, sumps, piping, and concrete building pads remain in place. The Area 6 CAS is located at the Decontamination Facility in Area 6, a facility which operated from 1971 to 2001 and was used to decontaminate vehicles, equipment, clothing, and other materials that had become contaminated during nuclear testing activities. The CAS includes the effluent collection and distribution systems for Buildings 6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

NSTec Environmental Restoration

2007-04-01T23:59:59.000Z

343

Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

David A. Strand

2004-06-01T23:59:59.000Z

344

Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

Robert F. Boehlecke

2004-06-01T23:59:59.000Z

345

Corrective Action Decision Document/Closure Report for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 232, Area 25 Sewage Lagoons, in accordance with the Federal Facility Agreement and Consent Order. Located at the Nevada Test Site in Nevada, approximately 65 miles northwest of Las Vegas, CAU 232 is comprised of Corrective Action Site 25-03-01, Sewage Lagoon. This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary for CAU 232. The Corrective Action Decision Document and Closure Report have been combined into one report because sample data collected during the July 1999 corrective action investigation (CAI) activities disclosed no evidence of contamination at the site. Contaminants of potential concern (COPCs) addressed during the CAI included total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, total pesticides, total herbicides, total petroleum hydrocarbons (gasoline and diesel/oil range), polychlorinated biphenyls, isotopic uranium, isotopic plutonium, strontium-90, and gamma-emitting radionuclides. The data confirmed that none of the COPCs identified exceeded preliminary action levels outlined in the CAIP; therefore, no corrective actions were necessary for CAU 232. After the CAI, best management practice activities were completed and included installation of a fence and signs to limit access to the lagoons, cementing Manhole No. 2 and the diverter box, and closing off influent and effluent ends of the sewage lagoon piping. As a result of the CAI, the DOE/NV recommended that: (1) no further actions were required; (2) no Corrective Action Plan would be required; and (3) no use restrictions were required to be placed on the CAU.

US Department of Energy Nevada Operations Office

1999-12-23T23:59:59.000Z

346

Corrective Action Investigation Plan for Corrective Action Unit 557: Spills and Tank Sites, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 557 is located in Areas 1, 3, 6, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada, and is comprised of the four corrective action sites (CASs) listed below: 01-25-02, Fuel Spill 03-02-02, Area 3 Subdock UST 06-99-10, Tar Spills 25-25-18, Train Maintenance Bldg 3901 Spill Site These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 3, 2008, by representatives of the Nevada Division of Environmental Protection (NDEP); U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 557. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 557 includes the following activities: Move surface debris and/or materials, as needed, to facilitate sampling. Conduct radiological survey at CAS 25-25-18. Perform field screening. Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern are present. If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. Collect samples of investigation-derived waste, as needed, for waste management purposes.

Alfred Wickline

2008-07-01T23:59:59.000Z

347

Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139.

Grant Evenson

2006-04-01T23:59:59.000Z

348

Management of corrective action wastes pursuant to proposed Subpart S  

SciTech Connect (OSTI)

Under Section 3004(u) of the Resource Conservation and Recovery Act (RCRA), owners/operators of permitted or interim status treatment, storage, and disposal facilities (TSDFs) are required to perform corrective action to address releases of hazardous waste or hazardous constituents from solid waste management units (SWMUs). On July 27, 1990, the Environmental Protection Agency (EPA) proposed specific corrective action requirements under Part 264, Subpart S of Title 40 of the code of Federal Regulations (CFR). One portion of this proposed rule, addressing requirements applicable to corrective action management units (CAMUs) and temporary units (TUs), was finalized on February 16, 1993 (58 FR 8658 et seq.). (CAMUs and TUs are RCRA waste management units that are specifically designated for the management of corrective action wastes). Portions of the proposed Subpart S rule that address processes for the investigation and cleanup of releases to environmental media have not yet been finalized. EPA and authorized State agencies, however, are currently using the investigation and cleanup procedures of the proposed rule as a framework for implementation of RCRA`s corrective action requirements. The performance of corrective action cleanup activities generates wastes that have to be characterized and managed in accordance with applicable RCRA requirements. This Information Brief describes these requirements. It is one of a series of information Briefs on RCRA Corrective Action.

Not Available

1995-02-01T23:59:59.000Z

349

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.

Mark Krauss

2011-09-01T23:59:59.000Z

350

Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: Move surface debris and/or materials, as needed, to facilitate sampling. Conduct radiological surveys. Perform field screening. Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. Collect samples of source material to determine the potential for a release. Collect samples of potential remediation wastes. Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

Alfred Wickline

2009-04-01T23:59:59.000Z

351

Thermodynamics using p4-improved staggered fermion action on QCDOC  

E-Print Network [OSTI]

We present an exploratory study of the thermodynamics of $N_f=3$ QCD with an improved staggered fermions using the QCDOC supercomputer. We use a p4 action with MILC-style smeared links (Fat 7). Some details of the implementation of the p4 action on QCDOC are discussed and performance benchmarks are given. We show preliminary results for the quark mass dependence of the pseudo-critical temperature $T_c$ from several lattice volumes . We also make a comparison between p4fat7 and the old p4 action.

Chulwoo Jung

2005-10-05T23:59:59.000Z

352

Euler - Heisenberg effective action and magnetoelectric effect in multilayer graphene  

E-Print Network [OSTI]

The low energy effective field model for the multilayer graphene (at ABC stacking) is considered. We calculate the effective action in the presence of constant external magnetic field $B$ (normal to the graphene sheet). We also calculate the first two corrections to this effective action caused by the in-plane electric field $E$ at $E/B \\ll 1$ and discuss the magnetoelectric effect. In addition, we calculate the imaginary part of the effective action in the presence of constant electric field $E$ and the lowest order correction to it due to the magnetic field ($B/E \\ll 1$).

M. I. Katsnelson; G. E. Volovik; M. A. Zubkov

2013-01-24T23:59:59.000Z

353

Action Theory Contraction and Minimal Change Ivan Jose Varzinczak  

E-Print Network [OSTI]

, ¬c, ¬h b b b Need for change the laws about the behavior of actions Ivan Jos´e Varzinczak (KSG, ¬c, ht, ¬c, ¬h c, ¬h b b b Need for change the laws about the behavior of actions Ivan Jos ¬t, ¬c, ¬h ¬t, ¬c, ht, ¬c, ¬h b b b Need for change the laws about the behavior of actions Ivan Jos

Recanati, Catherine

354

Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: Determine whether COCs are present. If COCs are present, determine their nature and extent. Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is recommended for the remaining 10 CASs in CAU 562. A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.

Mark Krause

2010-08-01T23:59:59.000Z

355

Corrective Action Decision Document/Closure Report for Corrective Action Unit 370: T-4 Atmospheric Test Site, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 370, T-4 Atmospheric Test Site, located in Area 4 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 370 is comprised of Corrective Action Site (CAS) 04-23-01, Atmospheric Test Site T-4. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 370 due to the implementation of the corrective action of closure in place with administrative controls. To achieve this, corrective action investigation (CAI) activities were performed from June 25, 2008, through April 2, 2009, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 370: T-4 Atmospheric Test Site and Record of Technical Change No. 1.

Patrick Matthews

2009-05-01T23:59:59.000Z

356

Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

D. L. Gustafason

2001-02-01T23:59:59.000Z

357

Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

U.S. Department of Energy, Nevada Operations Office

1999-05-05T23:59:59.000Z

358

Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 240, Area 25 Vehicle Washdown, which is located on the Nevada Test Site (NTS).

DOE/NV

1999-01-25T23:59:59.000Z

359

Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action alternatives.

Wickline, Alfred

2005-12-01T23:59:59.000Z

360

Corrective Action Decision Document for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU)563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: 03-04-02, Area 3 Subdock Septic Tank 03-59-05, Area 3 Subdock Cesspool 12-59-01, Drilling/Welding Shop Septic Tanks 12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.

Grant Evenson

2008-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Enforcement actions: Significant actions resolved, material licensees. Semiannual progress report, July--December 1997; Volume 16, Number 2, Part 3  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during the period (July--December 1997) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1998-04-01T23:59:59.000Z

362

Enforcement actions: Significant actions resolved, reactor licensees. Semiannual progress report, July--December 1997; Volume 16, Number 2, Part 2  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during the period (July--December 1997) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1998-04-01T23:59:59.000Z

363

Enforcement actions: Significant actions resolved, reactor licensees. Semiannual progress report, January--June 1997; Volume 16, Number 1, Part 2  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during the period (January--June 1997) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1997-09-01T23:59:59.000Z

364

Enforcement actions: Significant actions resolved reactor licensees. Volume 14, No. 2, Part 2, Quarterly progress report, April--June 1995  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1995-08-01T23:59:59.000Z

365

Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): 05-23-02, GMX Alpha Contaminated Area 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

Matthews, Patrick

2014-05-01T23:59:59.000Z

366

Climate Action Plans and Long-Range Transportation  

E-Print Network [OSTI]

Climate Action Plans and Long-Range Transportation Plans in the Pacific Northwest: A Review Climate Change and Impacts Mitigation versus Adaptation Impacts of Climate Change: Nation & the Pacific Northwest Climate Change Planning Efforts Transportation Sector Response - Survey Recommendations Continued

Bertini, Robert L.

367

Distinguishable patterns of competition, collusion, and parallel action  

E-Print Network [OSTI]

Alternative market structures are distinguishable by the degree of parallel action exhibited by producers. We show that the correlation between output levels varies systematically with the degree of interdependence among ...

Smith, James L.

2003-01-01T23:59:59.000Z

368

San Diego, California: Solar in Action (Brochure), Solar America...  

Broader source: Energy.gov (indexed) [DOE]

the Impact of Electricity Rate Structures on the Economics of PV Systems * Using a Solar Map for Education and Outreach October 2011 Solar in Action San Diego was designated...

369

SEE Action Webinar on Community-Based Social Marketing  

Broader source: Energy.gov [DOE]

Hosted by the State and Local Energy Efficiency Action Network, this webinar will describe community-based social marketing as a behavior-based approach for developing energy efficiency programs.

370

action program fusrap: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Corps that can affect a project's cost and schedule. Earlier this year, Buffalo District project teams reached US Army Corps of Engineers 22 How will the RealWorld Action Program...

371

Chapter 1 Purpose of and Need for Action  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

For the SOA path, BPA and other utilities have developed a non-wires measure called a remedial action scheme (RAS) that is carried out when needed. RAS uses a high-speed...

372

action management unit: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the true digital controller, locatedin Chapman, Patrick 32 In Situ Bioremediation Interim Remedial Action Report, Test Area North, Operable Unit 1-07B CiteSeer Summary: This...

373

MEDITERRANEAN ACTION PLAN MEDITERRANEAN COMMISSION FOR SUSTAINABLE DEVELOPMENT  

E-Print Network [OSTI]

MEDITERRANEAN ACTION PLAN MEDITERRANEAN COMMISSION FOR SUSTAINABLE DEVELOPMENT MEDITERRANEAN STRATEGY FOR SUSTAINABLE DEVELOPMENT Draft (work in progress) UNEP/MAP Athens, 17 February 2005 #12;MEDITERRANEAN STRATEGY FOR SUSTAINABLE DEVELOPMENT TABLE OF CONTENTS 1. TOWARDS SUSTAINABLE DEVELOPMENT

Zaferatos, Nicholas C.

374

Protective Action Criteria (PAC) with AEGLs, ERPGs, & TEELs:...  

Broader source: Energy.gov (indexed) [DOE]

(TEEL) data set has a new name; it is now called the Protective Action Criteria (PAC) dataset. While the PAC dataset continues to present the latest TEEL values (as developed by...

375

National Action Plan for Energy Efficiency Vision for 2025-A...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy. You have dialed into the DOE TAP Webcast titled National Action Plan For Energy Efficiency Vision for 2025, a Framework For Change. And we have Stacy Angel, who is the...

376

Challenging the Issue Class Action End-Run  

E-Print Network [OSTI]

An ever-increasing number of courts and commentators have advocated a simple solution to the seemingly insuperable problem of troublesome individual issues that often thwart certification of a Rule 23(b)(3) class action on predominance grounds...

Hines, Laura J.

2003-01-01T23:59:59.000Z

377

Obstacles to Determining Punitive Damages in Class Actions  

E-Print Network [OSTI]

Courts and commentators have often embraced the class action device as an ideal means of assessing punitive damages fairly in mass tort cases. In this Article, Professor Hines sounds a cautionary note by identifying a number of procedural...

Hines, Laura J.

2001-01-01T23:59:59.000Z

378

A transaction cost approach to unilateral presidential action  

E-Print Network [OSTI]

Presidents have two major assets at their disposal when seeking to alter policy: executive orders and legislative action. There are certain advantages and disadvantages to each course. Although presidency scholars have focused extensively...

Marchbanks, Miner Peek, III

2006-04-12T23:59:59.000Z

379

The United States Releases its Open Government National Action Plan  

Broader source: Energy.gov [DOE]

Today, President Obama signs the Open Government Partnership declaration, unveiling the U.S. Open Government National Action Plan. At the Energy Department, we are committed to creating a more...

380

On the Action, Topology and Geometric Invariants in Quantum Gravity  

E-Print Network [OSTI]

The action in general relativity (GR), which is an integral over the manifold plus an integral over the boundary, is a global object and is only well defined when the topology is fixed. Therefore, to use the action in GR and in most approaches to quantum gravity (QG) based on a covariant Lorentzian action, there needs to exist a prefered (global) timelike vector, and hence a global topology $R \\times S^3$, for it to make sense. This is especially true in the Hamiltonian formulation of QG. Therefore, in order to do canonical quantization, we need to know the topology, appropriate boundary conditions and (in an open manifold) the conditions at infinity, which affects the fundamental geometrical scalar invariants of the spacetime (and especially those which may occur in the QG action).

A. Coley

2015-03-16T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

assessing analgesic actions: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

painful information that clients are not yet ready to confront or divulge. Ann S. Uhler; Olga V. Parker, Ph.D. 6 Tools for Effects Based Course of Action Development and...

382

action case studies: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on all fields of N4 vector multiplet. We also consider the derivation of leading low-enrgy effective action at two loops. I. L. Buchbinder 2004-02-12 25 Microbial Source...

383

action measures progress: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on all fields of N4 vector multiplet. We also consider the derivation of leading low-enrgy effective action at two loops. I. L. Buchbinder 2004-02-12 9 Progression of Situation...

384

action research study: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on all fields of N4 vector multiplet. We also consider the derivation of leading low-enrgy effective action at two loops. I. L. Buchbinder 2004-02-12 31 European Research...

385

action phase iv: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on all fields of N4 vector multiplet. We also consider the derivation of leading low-enrgy effective action at two loops. I. L. Buchbinder 2004-02-12 256 Painleve IV and...

386

TITLE: Engendering Resilience: Building Sustainable Communities through Women's Collective Action  

E-Print Network [OSTI]

TITLE: Engendering Resilience: Building Sustainable Communities through Women's Collective Action in the periphery of Rio de Janeiro, a city known for its expansive urban sprawl, slum communities and environmental basic services and economic opportunities, climate change, pollution and resource degradation

Angenent, Lars T.

387

2011 SIMON FRASER UNIVERSITY carbon neutral action report  

E-Print Network [OSTI]

and 6 more buildings were recommissioned through the BC Hydro Continuous Optimization Program. SFU: IT Services Virtual Technology & Power Management 6.4 #12;CARBON NEUTRAL ACTION REPORT 2011 EXECUTIVE SUMMARY1

388

Non-Perturbative Renormalization and the Fermilab Action  

E-Print Network [OSTI]

We discuss the application of the regularization independent (RI) scheme of Rome/Southampton to determine the normalization of heavy quark operators non-perturbatively using the Fermilab action.

Huey-Wen Lin

2003-10-30T23:59:59.000Z

389

Geothermal Industry Applauds Congressional Action on Tax Legislation...  

Broader source: Energy.gov (indexed) [DOE]

Action on Tax Legislation January 1, 2013 - 4:11pm Addthis Washington, D.C. -- The Geothermal Energy Association applauds Congress for adopting today, as part of bi-partisan...

390

Bureau of Land Management - Techniques for Documenting a No Action...  

Open Energy Info (EERE)

for Documenting a No Action Alternative in an EA Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Techniques for Documenting...

391

abasic endonuclease action: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

392

action unit nos: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

393

affirmative action plan: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

394

analgesic actions autoradiographic: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

395

affirmative action plans: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

396

action plandenmark begraensning: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

397

action plan based: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

398

Using ASF+SDF to interpret and transform actions  

E-Print Network [OSTI]

Watt,D.A. Proc. 1st International Workshop on Action Semantics (ed. Mosses, P.D.), University of Aarhus, Denmark (1994) pp 129-142 University of Aarhus

Watt, D.A.

399

Department of Energy Initiates Formal Enforcement Action in Los...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

details on this and other departmental enforcement actions at the Office of Enforcement. Media contact(s): Megan Barnett, DOE, (202) 586-4940 Julianne Smith, NNSA, (202) 586-7371...

400

2012 National Energy Assurance Planning Conference After-Action...  

Broader source: Energy.gov (indexed) [DOE]

2 National Energy Assurance Planning Conference June 28-29, 2012 Gaylord Hotel and Convention Center, National Harbor, MD After-Action Report August 2012 Co-Sponsored by: U.S....

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Refinement of interface automata strengthened by action semantics  

E-Print Network [OSTI]

. Essentially, component interoperabil- ity have to satisfy the type compatibility of operations (the number/O automata and CSP [12]. There interaction is made by synchronizing shared input an output actions, while

Paris-Sud XI, Universit de

402

Revised Team Descriptions Action Figure Laboratories (AFL) is an  

E-Print Network [OSTI]

to introduce 3D printing and scanning in a retail space. Custom- ers can choose from a wide selection of action experience, children will be able to have truly unique parts 3D printed, including a 3D scanned miniature

403

A high-entropy wind r-process study based on nuclear-structure quantities from the new finite-range droplet model FRDM(2012)  

E-Print Network [OSTI]

Theoretical studies of the nucleosynthesis origin of the heavy elements in our Solar System (S.S.) by the rapid neutron-capture process (r-process) still face the entwined uncertainties in the possible astrophysical scenarios and the nuclear-physics properties far from stability. In this paper we present results from the investigation of an r-process in the high-entropy wind (HEW) of core-collapse supernovae (here chosen as one of the possible scenarios for this nucleosynthesis process), using new nuclear-data input calculated in a consistent approach, for masses and $\\beta$-decay properties from the new finite-range droplet model FRDM(2012). The accuracy of the new mass model is 0.56 MeV with respect to {\\sc AME2003}, to which it was adjusted. We compare the new HEW r-process abundance pattern to the latest S.S. r-process residuals and to our earlier calculations with the nuclear-structure quantities based on FRDM(1992). Substantial overall and specific local improvements in the calculated pattern of the r-process between $A\\simeq 110$ and $^{209}$Bi, as well as remaining deficiencies are discussed in terms of the underlying spherical and deformed shell structure far from stability.

Karl-Ludwig Kratz; Khalil Farouqi; Peter Mller

2014-06-10T23:59:59.000Z

404

Testing Advantageous Selection by Hidden Action: Evidence from Automobile Liability Insurance  

E-Print Network [OSTI]

Testing Advantageous Selection by Hidden Action: Evidence from Automobile Liability Insurance Selection by Hidden Action: Evidence from Automobile Liability Insurance Abstract This paper examines advantageous selection in automobile liability insurance from the approach with hidden action, which argues

Chaudhuri, Sanjay

405

Feedback Control Using Only Quantum Back-Action  

E-Print Network [OSTI]

The traditional approach to feedback control is to apply forces to a system by modifying the Hamiltonian. Here we show that quantum systems can be controlled without any Hamiltonian feedback, purely by exploiting the random quantum back-action of a continuous weak measurement. We demonstrate that, quite remarkably, the quantum back-action of such an adaptive measurement is just as effective at controlling quantum systems as traditional feedback.

Kurt Jacobs

2009-04-24T23:59:59.000Z

406

Barbero's Hamiltonian derived from a generalized Hilbert-Palatini action  

E-Print Network [OSTI]

Barbero recently suggested a modification of Ashtekar's choice of canonical variables for general relativity. Although leading to a more complicated Hamiltonian constraint this modified version, in which the configuration variable still is a connection, has the advantage of being real. In this article we derive Barbero's Hamiltonian formulation from an action, which can be considered as a generalization of the ordinary Hilbert-Palatini action.

Sren Holst

1995-11-07T23:59:59.000Z

407

EA-1628: Mitigation Action Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent(CRADAMitigation Action Plan EA-1617:Mitigation Action

408

EA-1636: Mitigation Action Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent(CRADAMitigation Action PlanMitigation Action Plan

409

Vitrification Melter Waste Incidental to Reprocessing Determination  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear GuideReportVictor Kane About UsVisitingVital

410

Do More Transparent Corporate Actions Following a Restatement Influence the SEC's Decision to Issue an Enforcement Action?  

E-Print Network [OSTI]

This study examines whether corporate transparency about a restatement influences the Securities and Exchange Commission's (SEC) decision to issue an enforcement action. I consider corporate transparency to be higher when firms initiate...

Files, Rebecca Lynn

2010-10-12T23:59:59.000Z

411

2006-2007 CHP Action Plan, Positioning CHP Value: Solutions for...  

Energy Savers [EERE]

CHP Action Plan, Positioning CHP Value: Solutions for National, Regional and Local Energy Issues, September 2006 2006-2007 CHP Action Plan, Positioning CHP Value: Solutions for...

412

The role of research evidence in school improvement : a case study of corrective action schools  

E-Print Network [OSTI]

knowledge, and innovation through the social networks inand innovation diffused throughout corrective action schools through socialand innovation diffused throughout corrective action schools through social

Salas, Minerva

2011-01-01T23:59:59.000Z

413

E-Print Network 3.0 - action integral Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Source: Patrick, George - Department of Mathematics and Statistics, University of Saskatchewan Collection: Mathematics 2 Date: June, 2009 Action: Accept; Administrative Action...

414

Policy Flash 2015-02 INCREMENTALLY FUNDING FIXED-PRICE ACTIONS...  

Office of Environmental Management (EM)

02 INCREMENTALLY FUNDING FIXED-PRICE ACTIONS Policy Flash 2015-02 INCREMENTALLY FUNDING FIXED-PRICE ACTIONS Questions concerning this policy flash should be directed to Michael...

415

E-Print Network 3.0 - action control evidence Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

it to an expanded version of the internal model theory of action control... of the phenomenology of action are generated and the processes ... Source: Ecole Polytechnique, Centre...

416

E-Print Network 3.0 - action model trained Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Josef Sivic, Francis Bach and Jean Ponce Summary: - time features and use an SVM to train action models. Our automatic video annotation is based on video... action clustering...

417

E-Print Network 3.0 - action potential backpropagation Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(BPAPs... or amplitude for a single BPAP, while variable backpropagation can occur for trains of action potentials... + spike; AP: Action ... Source: Diba, Kamran - Department of...

418

E-Print Network 3.0 - action potential amplitude Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Attenuation of Dendritic Action Potentials in Summary: remained constant during trains, K currents were necessary for dendritic action potential amplitude... determine the...

419

Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 190 is located in Areas 11 and 14 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 190 is comprised of the four Corrective Action Sites (CASs) listed below: (1) 11-02-01, Underground Centrifuge; (2) 11-02-02, Drain Lines and Outfall; (3) 11-59-01, Tweezer Facility Septic System; and (4) 14-23-01, LTU-6 Test Area. These sites are being investigated because existing information is insufficient on the nature and extent of potential contamination to evaluate and recommend corrective action alternatives. Additional information will be obtained before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS by conducting a corrective action investigation (CAI). The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on August 24, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture, and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 190. The scope of the CAU 190 CAI includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling; (2) Conduct radiological and geophysical surveys; (3) Perform field screening; (4) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present; (5) If COCs are present, collect additional step-out samples to define the lateral and vertical extent of the contamination; (6) Collect samples of source material, if present, to determine the potential for a release; (7) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes; and (8) Collect quality control samples. This Corrective Action Investigation Document (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense. Under the FFACO, this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval.

Wickline, Alfred

2006-12-01T23:59:59.000Z

420

Corrective Action Investigation Plan for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 309, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). Corrective Action Unit 309 is located in Area 12 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 mi beyond the main gate to the NTS. Corrective Action Unit 309 is comprised of the three Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: CAS 12-06-09, Muckpile; CAS 12-08-02, Contaminated Waste Dump (CWD); and CAS 12-28-01, I, J, and K-Tunnel Debris. Corrective Action Sites 12-06-09 and 12-08-02 will be collectively referred to as muckpiles in this document. Corrective Action Site 12-28-01 will be referred to as the fallout plume because of the extensive lateral area of debris and fallout contamination resulting from the containment failures of the J-and K-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and media sampling, where appropriate. Data will also be obtained to support waste management decisions. The CASs in CAU 309 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and/or the environment. Existing information on the nature and extent of potential contamination at these sites are insufficient to evaluate and recommend corrective action alternatives for the CASs. Therefore, additional information will be obtained by conducting a CAI prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS.

David A. Strand

2004-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before the evaluation and selection of corrective action alternatives.

Pastor, Laura

2005-12-01T23:59:59.000Z

422

Corrective Action Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 22 Sewage Lagoons site. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during September 1999, Soil samples were collected using a direct-push method and a backhoe. Soil samples were collected from the sludge bed, sewage lagoons, strainer box, and Imhoff tank areas. Characterization of the manholes associated with the septic system leading to the Imhoff tank was done during March 2000. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Soil sample results indicated that the only constituent of concern (COC) detected above Preliminary Action Levels (PALs) was total petroleum hydrocarbons (TPH) as diesel-range organics. This COC was detected in three samples from the sludge bed at concentrations up to 580 milligrams per kilogram (mg/kg). This exceeds the Nevada Division of Environmental Protection (NDEP) regulatory action level for TPH of 100 mg/kg (Nevada Administrative Code, 1996). Excavation of the area during characterization uncovered asphalt debris, four safety poles, and strands of barbed wire. The TPH-impacted soil and debris will be removed and disposed in the NTS Area 6 Hydrocarbon Landfill.

D. S. Tobiason

2000-09-01T23:59:59.000Z

423

2010 FCRPS2010 FCRPS Supplemental BiOpSupplemental BiOp  

E-Print Network [OSTI]

. Additional Actions: Amendments to the AMIP 4. Conclusions 5. Supplemental Incidental Take Statement 4 is consistent with the expectations of stock recruitment, in which productivity generally declines following

424

Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-05-08T23:59:59.000Z

425

Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points Nevada Test Site, Nevada (Draft), Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 556, Dry Wells and Surface Release Points, is located in Areas 6 and 25 of the Nevada Test Site, 65miles northwest of Las Vegas, Nevada. Corrective Action Unit 556 is comprised of four corrective action sites (CASs) listed below: 06-20-04, National Cementers Dry Well 06-99-09, Birdwell Test Hole 25-60-03, E-MAD Stormwater Discharge and Piping 25-64-01, Vehicle Washdown and Drainage Pit These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.

Grant Evenson

2007-02-01T23:59:59.000Z

426

Corrective Action Decision Document for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 254, R-MAD Decontamination Facility, under the Federal Facility Agreement and Consent Order. Located in Area 25 at the Nevada Test Site in Nevada, CAU 254 is comprised of Corrective Action Site (CAS) 25-23-06, Decontamination Facility. A corrective action investigation for this CAS as conducted in January 2000 as set forth in the related Corrective Action Investigation Plan. Samples were collected from various media throughout the CAS and sent to an off-site laboratory for analysis. The laboratory results indicated the following: radiation dose rates inside the Decontamination Facility, Building 3126, and in the storage yard exceeded the average general dose rate; scanning and static total surface contamination surveys indicated that portions of the locker and shower room floor, decontamination bay floor, loft floor, east and west decon pads, north and south decontamination bay interior walls, exterior west and south walls, and loft walls were above preliminary action levels (PALs). The investigation-derived contaminants of concern (COCs) included: polychlorinated biphenyls, radionuclides (strontium-90, niobium-94, cesium-137, uranium-234 and -235), total volatile and semivolatile organic compounds, total petroleum hydrocarbons, and total Resource Conservation and Recovery Act (Metals). During the investigation, two corrective action objectives (CAOs) were identified to prevent or mitigate human exposure to COCs. Based on these CAOs, a review of existing data, future use, and current operations at the Nevada Test Site, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Unrestricted Release Decontamination and Verification Survey; and Alternative 3 - Unrestricted Release Decontamination and Verification Survey and Dismantling of Building 3126. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors, and the preferred CAA chosen on technical merit was Alternative 2. This CAA was judged to meet all requirements for the technical components evaluated and applicable state and federal regulations for closure of the site, and reduce the potential for future exposure pathways.

U.S. Department of Energy, Nevada Operations Office

2000-06-01T23:59:59.000Z

427

Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1  

SciTech Connect (OSTI)

The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

Matthews, Patrick

2014-01-01T23:59:59.000Z

428

Site-specific analysis of the cobbly soils at the Grand Junction processing site. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

This report describes a recent site-specific analysis to evaluate the necessity of a recommendation to install a slurry trench around the Grand Junction processing site. The following analysis addresses the cobbly nature of the site's radiologically contaminated foundation soil, reassesses the excavation depths based on bulk radionuclide concentrations, and presents data-based arguments that support the elimination of the initially proposed slurry trench. The slurry trench around the processing site was proposed by the Remedial Action Contractor (RAC) to minimize the amount of water encountered during excavation. The initial depths of excavation developed during conceptual design, which indicated the need for a slurry wall, were reexamined as part of this analysis. This reanalysis, based on bulk concentrations of a cobbly subsoil, supports decreasing the original excavation depth, limiting the dewatering quantities to those which can be dissipated by normal construction activities. This eliminates the need for a slurry trench andseparate water treatment prior to permitted discharge.

Not Available

1992-06-01T23:59:59.000Z

429

General Algorithm For Improved Lattice Actions on Parallel Computing Architectures  

E-Print Network [OSTI]

Quantum field theories underlie all of our understanding of the fundamental forces of nature. The are relatively few first principles approaches to the study of quantum field theories [such as quantum chromodynamics (QCD) relevant to the strong interaction] away from the perturbative (i.e., weak-coupling) regime. Currently the most common method is the use of Monte Carlo methods on a hypercubic space-time lattice. These methods consume enormous computing power for large lattices and it is essential that increasingly efficient algorithms be developed to perform standard tasks in these lattice calculations. Here we present a general algorithm for QCD that allows one to put any planar improved gluonic lattice action onto a parallel computing architecture. High performance masks for specific actions (including non-planar actions) are also presented. These algorithms have been successfully employed by us in a variety of lattice QCD calculations using improved lattice actions on a 128 node Thinking Machines CM-5. {\\underline{Keywords}}: quantum field theory; quantum chromodynamics; improved actions; parallel computing algorithms.

F. D. R. Bonnet; Derek B. Leinweber; Anthony G. Williams

2001-02-09T23:59:59.000Z

430

Nuclear facility decommissioning and site remedial actions: a selected bibliography  

SciTech Connect (OSTI)

This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

1982-09-01T23:59:59.000Z

431

Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0  

SciTech Connect (OSTI)

The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2004-05-03T23:59:59.000Z

432

Optimization of the Oktay-Kronfeld Action Conjugate Gradient Inverter  

E-Print Network [OSTI]

Improving the Fermilab action to third order in heavy quark effective theory yields the Oktay-Kronfeld action, a promising candidate for precise calculations of the spectra of heavy quark systems and weak matrix elements relevant to searches for new physics. We have optimized the bi-stabilized conjugate gradient inverter in the SciDAC QOPQDP library and are developing a GPU code. The action is rewritten and the needed gauge-link combinations are precalculated. In tests with a MILC coarse lattice, this procedure accelerates the inverter by a factor of four. The remaining floating-point operations are mostly simple matrix multiplications between gauge links and fermion vectors, which we accelerate by more than an order of magnitude by using CUDA. Further gains could be achieved by using QUDA.

Yong-Chull Jang; Jon A. Bailey; Weonjong Lee; Carleton DeTar; Mehmet B. Oktay; Andreas S. Kronfeld

2013-11-21T23:59:59.000Z

433

Affine and degenerate affine BMW algebras: Actions on tensor space  

E-Print Network [OSTI]

The affine and degenerate affine Birman-Murakami-Wenzl (BMW) algebras arise naturally in the context of Schur-Weyl duality for orthogonal and symplectic quantum groups and Lie algebras, respectively. Cyclotomic BMW algebras, affine and cyclotomic Hecke algebras, and their degenerate versions are quotients. In this paper we explain how the affine and degenerate affine BMW algebras are tantalizers (tensor power centralizer algebras) by defining actions of the affine braid group and the degenerate affine braid algebra on tensor space and showing that, in important cases, these actions induce actions of the affine and degenerate affine BMW algebras. We then exploit the connection to quantum groups and Lie algebras to determine universal parameters for the affine and degenerate affine BMW algebras. Finally, we show that the universal parameters are central elements--the higher Casimir elements for orthogonal and symplectic enveloping algebras and quantum groups.

Daugherty, Zajj; Virk, Rahbar

2012-01-01T23:59:59.000Z

434

Corrective Action Investigation Plan for Corrective Action Unit 565: Stored Samples, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 565 is located in Area 26 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 565 is comprised of one corrective action site (CAS) listed--CAS 26-99-04, Ground Zero Soil Samples. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend closure of CAU 565. Additional information will be obtained by conducting a corrective action investigation before evaluating closure objectives and selecting the appropriate corrective action. The results of the field investigation will support closure and waste management decisions that will be presented in the Corrective Action Decision Document/Closure Report. The site will be investigated based on the data quality objectives (DQOs) developed on June 1, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was utilized to identify and define the type, amount, and quality of data needed to develop and evaluate closure for CAU 565. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to this CAS. The scope of the corrective action investigation for CAU 565 includes the following activities: (1) Remove stored samples, shelves, and debris from the interior of Building 26-2106. (2) Perform field screening on stored samples, shelves, and debris. (3) Dispose of stored samples, shelves, and debris. (4) Collect samples of investigation-derived waste, as needed, for waste management purposes. (5) Conduct radiological surveys of Building 26-2106 in accordance with the requirements in the ''NV/YMP Radiological Control Manual'' to determine if there is residual radiological contamination that would prevent the release of the building for unrestricted use. This Corrective Action Investigation has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Wickline, Alfred; McCall, Robert

2006-08-01T23:59:59.000Z

435

Closure report for housekeeping category, Corrective Action Unit 348, Nevada Test Site  

SciTech Connect (OSTI)

This Closure Report summarizes the corrective actions which were completed at twelve Corrective Action Sites within Corrective Action Unit 348 at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.

NONE

1998-01-01T23:59:59.000Z

436

Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1  

SciTech Connect (OSTI)

This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC).

NONE

1997-01-01T23:59:59.000Z

437

A model for production, perception, and acquisition of actions in face-to-face communication  

E-Print Network [OSTI]

behavior has been used primarily for private or non-communicative actions like walking, reaching willed actions can be private or communicative. A private action can occur "in a private context, in mere (...) individuals" (Jeannerod 1999, p.1). An example for a private action is reaching for or grasping an object

Kopp, Stefan

438

Corrective Action Decision Document/Closure Report for Corrective Action Unit 383: Area E-Tunnel Sites, Nevada Test Site  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: CAS 12-06-06, Muckpile CAS 12-25-02, Oil Spill CAS 12-28-02, Radioactive Material Drainage below the Muckpile Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.

NSTec Environmental Restoration

2010-03-15T23:59:59.000Z

439

Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada  

SciTech Connect (OSTI)

This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to the FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.

NONE

1998-01-01T23:59:59.000Z

440

Final voluntary release assessment/corrective action report  

SciTech Connect (OSTI)

The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

NONE

1996-11-12T23:59:59.000Z

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Record of Technical Change for Corrective Action Plan for Corrective Action Unit 140: Waste Dumps, burn Pits, and Storage Area, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Record of Technical Change for Corrective Action Plan for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada (DOE/NV--963-Rev 2, dated November 2004).

U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

2005-01-05T23:59:59.000Z

442

Copyright Literacy Standards for Graduate Education: A Call to Action!  

E-Print Network [OSTI]

Copyright?Literacy?Standards?for?Graduate?Education?? A?Call?to?Action!?by?G.?Clement is?licensed?under?a?Creative?Commons? Attribution?NonCommercial?NoDerivs 3.0?Unported License.?Permissions?beyond...?the?scope?of?this?license?may?be?available?at? http://library.tamu.edu/directory/gclement. Copyright?Literacy?Standards? f G d t Ed ti USETD?Association?Conference,??Orlando,?Florida?May?19,?2011 or? ra ua e? uca on: A?Call?To?Action!? Gail?Clement Librarian?&??Associate?Professor Digital...

Clement, Gail

2011-05-19T23:59:59.000Z

443

EA-1679: Mitigation Action Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent(CRADAMitigation Action50:0: FindingMitigation Action

444

EA-1704: Mitigation Action Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent(CRADAMitigation Action50:0:0:6:Mitigation Action Plan

445

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

CAU 104 comprises the following corrective action sites (CASs): 07-23-03, Atmospheric Test Site T-7C 07-23-04, Atmospheric Test Site T7-1 07-23-05, Atmospheric Test Site 07-23-06, Atmospheric Test Site T7-5a 07-23-07, Atmospheric Test Site - Dog (T-S) 07-23-08, Atmospheric Test Site - Baker (T-S) 07-23-09, Atmospheric Test Site - Charlie (T-S) 07-23-10, Atmospheric Test Site - Dixie 07-23-11, Atmospheric Test Site - Dixie 07-23-12, Atmospheric Test Site - Charlie (Bus) 07-23-13, Atmospheric Test Site - Baker (Buster) 07-23-14, Atmospheric Test Site - Ruth 07-23-15, Atmospheric Test Site T7-4 07-23-16, Atmospheric Test Site B7-b 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.

Patrick Matthews

2012-10-01T23:59:59.000Z

446

Uranium Mill Tailings Remedial Action Project (UMTRAP), Slick Rock, Colorado, Revision 1. Volume 1, Calculations, Final design for construction  

SciTech Connect (OSTI)

Volume one contains calculations for: embankment design--embankment material properties; Union Carbide site--bedrock contours; vicinity properties--origin of contamination; North Continent and Union Carbide sites contaminated materials--excavation quantities; and demolition debris--quantity estimate.

NONE

1995-09-01T23:59:59.000Z

447

Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 542 is located in Areas 3, 8, 9, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 542 is comprised of eight corrective action sites (CASs): (1) 03-20-07, ''UD-3a Disposal Hole''; (2) 03-20-09, ''UD-3b Disposal Hole''; (3) 03-20-10, ''UD-3c Disposal Hole''; (4) 03-20-11, ''UD-3d Disposal Hole''; (5) 06-20-03, ''UD-6 and UD-6s Disposal Holes''; (6) 08-20-01, ''U-8d PS No.1A Injection Well Surface Release''; (7) 09-20-03, ''U-9itsy30 PS No.1A Injection Well Surface Release''; and (8) 20-20-02, ''U-20av PS No.1A Injection Well Surface Release''. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 30, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 542. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 542 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Conduct geophysical surveys to locate previously unidentified features at CASs 03-20-07, 03-20-09, 03-20-10, 03-20-11, and 06-20-03. (4) Perform field screening. (5) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present. (6) Collect quality control samples for laboratory analyses to evaluate the performance of measurement systems and controls based on the requirements of the data quality indicators. (7) If COCs are present at the surface/near surface (< 15 feet below ground surface), collect additional step-out samples to define the extent of the contamination. (8) If COCs are present in the subsurface (i.e., base of disposal hole), collect additional samples to define the vertical extent of contamination. A conservative use restriction will be used to encompass the lateral extent of subsurface contamination. (9) Stake or flag sample locations in the field, and record coordinates through global positioning systems surveying. (10) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Laura Pastor

2006-05-01T23:59:59.000Z

448

Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action  

SciTech Connect (OSTI)

The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section.

NONE

1994-09-01T23:59:59.000Z

449

Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992  

SciTech Connect (OSTI)

This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan.

NONE

1993-07-01T23:59:59.000Z

450

Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

This appendix assesses the present conditions and data for the inactive uranium mill site near Tuba City, Arizona. It consolidates available engineering, radiological, geotechnical, hydrological, meterological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill and tailings site so that the Remedial Action Contractor (RAC) may complete final designs of the remedial actions.

Not Available

1987-05-01T23:59:59.000Z

451

Corrective Action Investigation Plan for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.

David A. Strand

2005-01-01T23:59:59.000Z

452

Corrective Action Decision Document for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Sites, Nevada with ROTC 1, Errata Sheet, Revision 0, January 2007  

SciTech Connect (OSTI)

The purpose of this CADD is to identify and provide the rationale for the recommendation of a corrective action alternative (CAA) for the seven CASs within CAU 139. Corrective action investigation activities were performed from June 26 through September 27, 2006, as set forth in the CAU 139 Corrective Action Investigation Plan (CAIP).

Grant Evenson

2007-01-01T23:59:59.000Z

453

Commitment to Civil Rights and Affirmative Action 2009 I:\\Extension\\Civil Rights\\Commitment to Civil Rights and Affirmative Action.doc  

E-Print Network [OSTI]

Commitment to Civil Rights and Affirmative Action 2009 I:\\Extension\\Civil Rights\\Commitment to Civil Rights and Affirmative Action.doc COMMITMENT TO CIVIL RIGHTS AND AFFIRMATIVE ACTION government, another person, and private groups. The United States Constitution, state constitutions and many

Collins, Gary S.

454

Corrective Action Decision Document/Closure Report for Corrective Action Unit 504: 16a-Tunnel Muckpile, Nevada Test Site  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 504, 16a-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 504 is comprised of four Corrective Action Sites (CASs): 16-06-01, Muckpile 16-23-01, Contaminated Burial Pit 16-23-02, Contaminated Area 16-99-01, Concrete Construction Waste Corrective Action Site 16-23-01 is not a burial pit; it is part of CAS 16-06-01. Therefore, there is not a separate data analysis and assessment for CAS 16-23-01; it is included as part of the assessment for CAS 16-06-01. In addition to these CASs, the channel between CAS 16-23-02 (Contaminated Area) and Mid Valley Road was investigated with walk-over radiological surveys and soil sampling using hand tools. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 504. A CADD was originally submitted for CAU 504 and approved by the Nevada Division of Environmental Protection (NDEP). However, following an agreement between NDEP, DTRA, and the DOE, National Nuclear Security Administration Nevada Site Office to change to a risk-based approach for assessing the corrective action investigation (CAI) data, NDEP agreed that the CAU could be re-evaluated using the risk-based approach and a CADD/CR prepared to close the site.

NSTec Environmental Restoration

2010-03-15T23:59:59.000Z

455

Corrective Action Investigation Plan for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 335, Area 6 Injection Well and Drain Pit, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 335 consists of three Corrective Action Sites (CASs). The CAU is located in the Well 3 Yard in Area 6 at the Nevada Test Site. Historical records indicate that the Drain Pit (CAS 06-23-03) received effluent from truck-washing; the Drums/Oil Waste/Spill (CAS 06-20-01) consisted of four 55-gallon drums containing material removed from the Cased Hole; and the Cased Hole (CAS 06-20-02) was used for disposal of used motor oil, wastewater, and debris. These drums were transported to the Area 5 Hazardous Waste Accumulation Site in July 1991; therefore, they are no longer on site and further investigation or remediation efforts are not required. Consequently, CAS 06-20-01 will be closed with no further action and details of this decision will be described in the Closure Report for this CAU. Any spills that may have been associated with this CAS will be investigated and addressed under CAS 06-20-02. Field investigation efforts will be focused on the two remaining CASs. The scope of the investigation will center around identifying any contaminants of potential concern (COPCs) and, if present, determining the vertical and lateral extent of contamination. The COPCs for the Drain Pit include: total volatile/ semivolatile organic compounds, total petroleum hydrocarbons (gasoline-and diesel-range organics), ethylene glycol monobutyl ether, polychlorinated biphenyls, total Resource Conservation and Recovery Act metals, and radionuclides. The COPCs for the Cased Hole include: total volatile/ semivolatile organic compounds, total petroleum hydrocarbons (diesel-range organics only), and total Resource Conservation an d Recovery Act metals. Both biased surface and subsurface soil sampling will be conducted, augmented by visual inspection, video surveys, and electromagnetic surveys. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

DOE/NV

2000-12-01T23:59:59.000Z

456

Corrective Action Investigation Plan for Corrective Action Unit 486: Double Tracks RADSAFE Area Nellis Air Force Range, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 486, the Double Tracks Radiological Safety (RADSAFE) Area (DTRSA) which is located on the Nellis Air Force Range 71North (N), west of the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range Complex, is approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 486 is comprised of CAS 71-23-001-71DT consisting of two areas of concern referred to as the vehicle decontamination area and the animal burial pit. The DTRSA is located on the west side of the Cactus Range approximately 8 km (5 mi) southwest of the Cactus Spring gate at the intersection of the Cactus Spring Road and the Double Tracks Control Point Road (Figure 1-2). The DTRSA was used during May 1963 to decontaminate vehicles, equipment, personnel, and animals from the Double Tracks test. The DTRSA is one of three areas identified as a potential location for the disposal of radioactively contaminated materials from the Double Tracks experiment. The other two locations are the Cactus Spring Waste Trenches (CAU 426) and the Roller Coaster RADSAFE Area (CAU 407), both of which have been investigated. The surface and subsurface soils are likely to have been impacted by plutonium and other contaminants of potential concern (COPCs) associated with decontamination activities at this site.

IT Las Vegas

1998-10-15T23:59:59.000Z

457

Corrective Action and Involuntary Termination Policy 8.15  

E-Print Network [OSTI]

Corrective Action and Involuntary Termination Policy 8.15 Office of Human Resources Applies to list. Staff may be reprimanded, demoted or terminated for violation of university rules, policies and Process Guide. In appropriate cases, the university reserves the right to move to immediate termination

Howat, Ian M.

458

NNSA PERSONNEL SECURITY CLEARANCE ACTION REQUEST Program Code: NA  

E-Print Network [OSTI]

NNSA PERSONNEL SECURITY CLEARANCE ACTION REQUEST Program Code: NA OFFICIAL USE ONLY (UPON sections and fields are required to be completed. The National Nuclear Security Administration (NNSA material (SNM). AL F 470.1 Form is used by NNSA Personnel Security Department to initiate background

Fuerschbach, Phillip

459

LEGAL REALISM IN ACTION: INDIRECT COPYRIGHT LIABILITY'S CONTINUING TORT  

E-Print Network [OSTI]

1 LEGAL REALISM IN ACTION: INDIRECT COPYRIGHT LIABILITY'S CONTINUING TORT FRAMEWORK AND SONY'S DE standard, derived in Sony Corp. of America v. Universal City Studios, Inc. from patent law and reasserted for distributors of dual-use technologies. Yet, when one looks to cases decided since Sony, subsequent legislative

Kammen, Daniel M.

460

Recent Action-Research and future course in Water Sector.  

E-Print Network [OSTI]

Block 380 Thakar people. 200 animals. 40 households. And an acute shortage of water for 5 monthsRecent Action-Research and future course in Water Sector. Milind Sohoni, CTARA, IIT-soil, water, energy end-user defined or demand-driven-drinking water. Towards change-deliver technology

Sohoni, Milind

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

action umtra project: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

umtra project First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 CIMI PROJECT DISSEMINATION ACTIONS...

462

Uranium Mill Tailings Remedial Action Project surface project management plan  

SciTech Connect (OSTI)

This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

Not Available

1994-09-01T23:59:59.000Z

463

action project surface: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

action project surface First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 CIMI PROJECT DISSEMINATION...

464

Student Action Committee Report on the Student Comprehensive Fee  

E-Print Network [OSTI]

1 Student Action Committee Report on the Student Comprehensive Fee April, 2010 #12;2 Table:................................................................................................................15 #12;3 Executive Summary: The SGA formally adopted a definition of the Student Comprehensive Fee requiring that all sections support specific services and facilities accessible to all current students

Hayden, Nancy J.

465

Australia's Humanitarian Action Policy and Disaster Risk Reduction Policy  

E-Print Network [OSTI]

to get more information Disaster Risk Reduction Team Disaster Prevention and Risk Reduction Section GrantAustralia's Humanitarian Action Policy and Disaster Risk Reduction Policy A Commitment: · Disaster risk reduction is integrated into the Australian aid program · Capacity of partner governments

Botea, Adi

466

The Dangerous Allure of the Issue Class Action  

E-Print Network [OSTI]

In the complex and chaotic world of mass torts, a class action that aggregates the claims of aggrieved individuals against a common defendant would seem not only a prudent solution, but possibly even a necessary one. The class device holds out...

Hines, Laura J.

2004-01-01T23:59:59.000Z

467

Franchising, Arbitration, and the Future of the Class Action  

E-Print Network [OSTI]

In this article, we consider whether arbitration clauses are likely to result in the extinction of the class action. In our view, the answer is no. We reach that conclusion for two main reasons. First, at least some parties that draft standard form...

Drahozal, Christopher R.; Wittrock, Quentin R.

2009-01-01T23:59:59.000Z

468

How mechanical pipe organ actions work against transient control  

E-Print Network [OSTI]

How mechanical pipe organ actions work against transient control A. Woolley University of Edinburgh be clearly demonstrated by blowing an organ pipe that it's transient can be varied, although the effect is not generally considered `musical'. It has been debated for several decades whether mechanical pipe organ

Paris-Sud XI, Université de

469

Perception, Categories, and Possibilities for Action Brett R. Fajen  

E-Print Network [OSTI]

Science, Rensselaer Polytechnic Institute Michael T. Turvey Center for the Ecological Study of Perception276 Perception, Categories, and Possibilities for Action Brett R. Fajen Department of Cognitive that the perception of boundaries separating categories plays a fundamental role in adaptive behavior

Fajen, Brett

470

Sustainable Energy for All A Framework for Action  

E-Print Network [OSTI]

1 Sustainable Energy for All A Framework for Action The Secretary-General's High-level Group on Sustainable Energy for All January 2012 #12;2 The Secretary-General's High-level Group on Sustainable Energy with sustainable energy for all is achievable 7 2. We must all act together to realise this vision and all

Kammen, Daniel M.

471

On Gravity, Torsion and the Spectral Action Principle  

E-Print Network [OSTI]

We consider compact Riemannian spin manifolds without boundary equipped with orthogonal connections. We investigate the induced Dirac operators and the associated commutative spectral triples. In case of dimension four and totally anti-symmetric torsion we compute the Chamseddine-Connes spectral action, deduce the equations of motions and discuss critical points.

Frank Pfaeffle; Christoph A. Stephan

2011-06-03T23:59:59.000Z

472

Natural Gas: Major Legislative and Regulatory Actions (1935 - 2008)  

Reports and Publications (EIA)

This special report Web-based product presents a chronology of some of the key federal legislative and regulatory actions that have helped shape the natural gas market, with particular emphasis on policy directives from 1978 to October 2008. Separate reports provide brief descriptions of specific legislation, regulations, or policies, and their impacts on the natural gas market.

2009-01-01T23:59:59.000Z

473

Action of friction Frictional processes are not often considered in  

E-Print Network [OSTI]

Action of friction Frictional processes are not often considered in any detail in studies are switched off, the pressure falls to just 921mb. Frictional processes can be thought of in terms of changes. The first term on the right­hand­side represents barotropic damping by friction, and the second

Plant, Robert

474

From global change science to action with social sciences  

SciTech Connect (OSTI)

US efforts to integrate social and biophysical sciences to address the issue of global change exist within a wider movement to understand global change as a societal challenge and to inform policy. Insights from the social sciences can help transform global change research into action.

Weaver, C. P.; Mooney, Sian; Allen, D.; Beller-Simms, Nancy; Fish, T.; Grambsch, A.; Hohenstein, W.; Jacobs, Kathy; Kenney, Melissa A.; Lane, Meredith A.; Langner, L.; Larson, E.; McGinnis, D. L.; Moss, Richard H.; Nichols, L. G.; Nierenberg, Claudia; Seyller, E. A.; Stern, Paul; Winthrop, R.

2014-08-01T23:59:59.000Z

475

Opportunities, Barriers and Actions for Industrial Demand Response in  

E-Print Network [OSTI]

LBNL-1335E Opportunities, Barriers and Actions for Industrial Demand Response in California A.T. Mc of Global Energy Partners. This work described in this report was coordinated by the Demand Response Demand Response in California. PIER Industrial/Agricultural/Water EndUse Energy Efficiency Program. CEC

476

SOCAP: System for Operations Crisis Action Planning Marie A. Bienkowski  

E-Print Network [OSTI]

), to the problem of generating crisis action operations plans in a joint military domain* . We describe our technology to the general problem of planning and executing joint military operations including supporting or development activity has integrated a generative planning system into an operational military environment

Wilkins, David E.

477

Learning Partially Observable Deterministic Action Models Computer Science Department  

E-Print Network [OSTI]

. For example, the overall time for learning STRIPS actions' effects is O(T · n). For other cases the update per- imate the representation with a k-CNF formula, yielding an overall time of O(T · nk ) for the entire, and games. Other applications, such as robotics, human-computer interfaces, and program and

Amir, Eyal

478

Learning Partially Observable Deterministic Action Models Computer Science Department  

E-Print Network [OSTI]

. For example, the overall time for learning STRIPS actions' effects is O(T · n). For other cases the update per approx­ imate the representation with a k­CNF formula, yielding an overall time of O(T · n k, virtual worlds, and games. Other applications, such as robotics, human­computer interfaces, and progr

Amir, Eyal

479

Description of the Formerly Utilized Sites Remedial Action Program  

SciTech Connect (OSTI)

The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

Not Available

1980-09-01T23:59:59.000Z

480

SymposiumandIndustrialAffiliatesProgramLightinAction Industrial Affiliates Program  

E-Print Network [OSTI]

SymposiumandIndustrialAffiliatesProgramLightinAction #12;Industrial Affiliates Program Friday, 8 Session I Abstract: Recently Additive Manufacturing (AM) has been hailed as the "third industrial revolution" by Economist magazine [April -2012]. Precision of the product manufactured by AM largely depends

Van Stryland, Eric

Note: This page contains sample records for the topic "actions quantities incidental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Remedial action work plan for the Colonie site. Revision 1  

SciTech Connect (OSTI)

The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab.

Not Available

1985-08-01T23:59:59.000Z

482

MIXING RANK-ONE ACTIONS OF LOCALLY COMPACT ABELIAN GROUPS  

E-Print Network [OSTI]

MIXING RANK-ONE ACTIONS OF LOCALLY COMPACT ABELIAN GROUPS Alexandre I. Danilenko and Cesar E. Silva that such transformations are mixing of all orders [Ka], [Ry1] and have minimal self-joinings of all orders [Ki], [Ry1 this progress, not so many concrete examples of rank-one mixing ac- tions are known. Most of them were obtained

Silva, Cesar E.

483

Representing Abductive Practical Reasoning as an Action-Based  

E-Print Network [OSTI]

Representing Abductive Practical Reasoning as an Action-Based Alternating Transition System Floris present an approach to abductive reasoning by examin- ing it in the context of an argumentation scheme to rea- son abductively about how an agent might have acted to find itself in a particular sceanrio

Atkinson, Katie

484

Motorcycle Riding Simulator: How to Estimate Robustly the Rider's Action?  

E-Print Network [OSTI]

1 Motorcycle Riding Simulator: How to Estimate Robustly the Rider's Action? Lamri Nehaoua, Hichem Arioui and Said Mammar Abstract This paper deals with a motorcycle riding simulator and addresses two key. The reconstructed torque is used as the main control of the virtual motorcycle dynamic model, in order to actuate

Paris-Sud XI, Université de

485

Superfund record of decision (EPA Region 2): Dover Municipal Well 4, Morris County, Dover, NJ. (First remedial action), September 1992  

SciTech Connect (OSTI)

The Dover Municipal Well 4 (DMW-4) site is located within the 500-year floodplain of the Rockaway River, in the Town of Dover, Morris County, New Jersey. Surrounding land use is mixed residential and commercial/light industrial. In 1980, sampling and analysis of ground water from DMW-4 identified the presence of VOCs-specifically, chlorinated solvents-above federal and state drinking water standards. Subsequently, DMW-4 was voluntarily removed from service by the Town, and standby Well 3 was activated as a potable water production well. The sources of VOC contamination have been traced to the Howmet Turbine Components Corporation (Dover Casting Division) and the New Jersey Natural Gas Company, both of which are under state administrative consent orders to remediate their individual properties. The ROD addresses remediation of the contaminated ground water in the shallow, intermediate, and deep aquifers at the DMW-4 site, as OU1. The primary contaminants of concern affecting the ground water are VOCs, including benzene, PCE and TCE, and, metals including lead. The selected remedial action for this site includes onsite pumping and treatment of contaminated ground water from both the intermediate and deep aquifers using air stripping to remove VOCs; discharging the treated water offsite to the public water supply system to be used for potable water, with reinjection of surplus quantities.

Not Available

1992-09-30T23:59:59.000Z

486

Accelerating RCRA corrective action: The principles of the DOE approach  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is involved in the remediation of environmental contamination at many of its facilities under the Resource Conservation and Recovery Act (RCRA). RCRA`s corrective action provisions were established by the Hazardous and Solid Waste Amendments of 1984 (HSWA). In response to the HSWA mandate, EPA established a program for the conduct of RCRA corrective action that was similar to that established under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). In addition, EPA developed and implemented its ``stabilization`` initiative as a means of quickly addressing immediate risks posed by releases until long term solutions can be applied. To improve the efficiency of environmental restoration at its facilities, DOE is developing guidance and training programs on accelerated environmental restoration under RCRA. A RCRA guidance document, entitled ``Accelerating RCRA Corrective Action at DOE Facilities,`` is currently being developed by DOE`s Office of Environmental Policy and Assistance. The new guidance document will outline a decision-making process for determining if acceleration is appropriate for individual facilities, for identifying, evaluating, and selecting options for program acceleration, and for implementing selected acceleration options. The document will also discuss management and planning strategies that provide a firm foundation for accelerating RCRA corrective action. These strategies include a number of very basic principles that have proven effective at DOE and other federal facilities, as well as some new approaches. The purpose of this paper is to introduce DOE`s new guidance document, discuss the general approach presented in the guidance for accelerating RCRA corrective action, and to emphasize some of the more important principles of effective management and planning.

Kimmell, T.A.; Green, D.R.; Ranek, N.L. [Argonne National Lab., IL (United States); Coalgate, J.L. [USDOE, Washington, DC (United States)

1995-03-01T23:59:59.000Z

487

Corrective Action Investigation Plan for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 529, Area 25 Contaminated Materials, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 529 consists of one Corrective Action Site (25-23-17). For the purpose of this investigation, the Corrective Action Site has been divided into nine parcels based on the separate and distinct releases. A conceptual site model was developed for each parcel to address the translocation of contaminants from each release. The results of this investigation will be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-02-26T23:59:59.000Z

488

Corrective Action Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 166, Storage Yards and Contaminated Materials, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 166 consists of seven Corrective Action Sites (CASs) located in Areas 2, 3, 5, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 166 consists of the following CASs: (1) CAS 02-42-01, Cond. Release Storage Yd - North; (2) CAS 02-42-02, Cond. Release Storage Yd - South; (3) CAS 02-99-10, D-38 Storage Area; (4) CAS 03-42-01, Conditional Release Storage Yard; (5) CAS 05-19-02, Contaminated Soil and Drum; (6) CAS 18-01-01, Aboveground Storage Tank; and (7) CAS 18-99-03, Wax Piles/Oil Stain. Details of the site history and site characterization results for CAU 166 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007).

NSTec Environmental Restoration

2007-10-01T23:59:59.000Z

489

Corrective Action Plan for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The Area 25 Reactor Maintenance, Assembly, and Disassembly Decontamination Facility is identified in the Federal Facility Agreement and Consent Order (FFACO) as Corrective Action Unit (CAU) 254. CAU 254 is located in Area 25 of the Nevada Test Site and consists of a single Corrective Action Site CAS 25-23-06. CAU 254 will be closed, in accordance with the FFACO of 1996. CAU 254 was used primarily to perform radiological decontamination and consists of Building 3126, two outdoor decontamination pads, and surrounding soil within an existing perimeter fence. The site was used to decontaminate nuclear rocket test-car hardware and tooling from the early 1960s through the early 1970s, and to decontaminate a military tank in the early 1980s. The site characterization results indicate that, in places, the surficial soil and building materials exceed clean-up criteria for organic compounds, metals, and radionuclides. Closure activities are expected to generate waste streams consisting of nonhazardous construction waste. petroleum hydrocarbon waste, hazardous waste, low-level radioactive waste, and mixed waste. Some of the wastes exceed land disposal restriction limits and will require off-site treatment before disposal. The recommended corrective action was revised to Alternative 3- ''Unrestricted Release Decontamination, Verification Survey, and Dismantle Building 3126,'' in an addendum to the Correction Action Decision Document.

C. M. Obi

2000-12-01T23:59:59.000Z

490

Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 31, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 550. The potential contamination sources associated with the study groups are from nuclear testing activities conducted at CAU 550. The DQO process resulted in an assumption that the total effective dose (TED) within the default contamination boundary of CAU 550 exceeds the final action level and requires corrective action. The presence and nature of contamination outside the default contamination boundary at CAU 550 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the TED at sample locations to the dose-based final action level. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each group of CASs.

Grant Evenson

2012-05-01T23:59:59.000Z

491

Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: 25-23-22, Contaminated Soils Site 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Corrective Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a Plowshare test where five nuclear devices were buried 140 feet (ft) deep in a row at 150-ft intervals. These devices were detonated on March 12, 1968, to produce a trench 254 ft wide, 865 ft long, and 70 ft deep. The mesa where the test was conducted is surrounded on three sides by ravines, and the entire end of the mesa is fenced and posted as a contamination area. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs. Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 2, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 375.

Patrick Matthews

2010-03-01T23:59:59.000Z

492

Corrective Action Decision Document/Closure Report for Corrective Action Unit 546: Injection Well and Surface Releases Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 546, Injection Well and Surface Releases, at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 546 is comprised of two corrective action sites (CASs): 06-23-02, U-6a/Russet Testing Area 09-20-01, Injection Well The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 546. To achieve this, corrective action investigation (CAI) activities were performed from May 5 through May 28, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 546: Injection Well and Surface Releases, Nevada Test Site, Nevada (NNSA/NSO, 2008). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: Determine whether a contaminant of concern is present at a given CAS. Determine whether sufficient information is available to evaluate potential corrective action alternatives at each CAS. The CAU 546 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Because DQO data needs were met, and corrective actions have been implemented, it has been determined that no further corrective action (based on risk to human receptors) is necessary for the CAU 546 CASs. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: No further corrective actions are needed for CAU 546 CASs. No Corrective Action Plan is required. A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 546. Corrective Action Unit 546 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order. Analytes detected during the CAI were evaluated against final action levels established in this document. No analytes were detected at concentrations exceeding final action levels. However, contaminants of concern were presumed to be present in the subsurface soil at CAS 09-20-01. Therefore, the corrective action of close in place was selected as the preferred alternative for this CAS. Potential source material was removed from CAS 06-23-02; therefore, the corrective action of clean closure was selected as the preferred alternative at this CAS.

Alfred Wickline

2008-12-01T23:59:59.000Z

493

CORRECTIVE ACTION DECISION DOCUMENT/CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 527: HORN SILVER MINE, NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADDKR) has been prepared for Corrective Action Unit (CAU) 527: Horn Silver Mine, Nevada Test Site (NTS), Nevada, in accordance with the Federal Facility Agreement and Consent Order (1996). Corrective Action Unit 527 is located within Area 26 of the NTS and consists of CAS 26-20-01, Contaminated Waste Dump No.1. This CADDKR refers to the site as CAU 527 or the Horn Silver Mine (HSM). This CADDKR provides or references the specific information necessary to support the closure of this CAU. Corrective action investigation activities were performed from November 12,2003 through January 21,2004. Additional sampling of liquid obtained from HSM-3 was conducted on May 3,2004. Corrective action investigation activities were performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 527 (NNSAiNV, 2002a). Assessment of the data generated from investigation activities identified the explosive nitrobenzene as a contaminant of concern (COC) on the floor of the 500-foot drift (HSM No.2). No other COCs were identified in the rock samples collected during the investigation activities. The air samples collected from borings HSM-1, HSM-2, and HSM-3 showed volatile organic compounds (primarily gasoline-related contaminants) to be present above the acceptable residential exposure criteria in the boreholes. A conservative modeling effort demonstrated that these concentrations would not migrate to the surface at concentrations that will present an unacceptable risk to future land users. However, other COCs are assumed to exist based on historical documentation on the types of waste placed in the shaft; therefore, the mine including the 300- and 500-foot drifts is considered to be contaminated above action levels. Current results of the field investigation show there are no active transport mechanisms or exposure routes for the contaminants identified in the 500-foot drift. The analytical data did not show the migration of COCs beyond the floor of the 500-foot drift or from the air within the drift. On a conservative basis, the subsurface volume of the zone of contamination is limited to a depth from 150 ft to a maximum of 670 feet below ground surface extending to a radius of 300 feet from the mineshaft. Based on these data, a use restriction will be established for this volume of soil. In addition, the security of the mineshaft is maintained and does not allow unauthorized personnel to enter the vicinity of the mineshaft. Since the removal of the contaminants is not feasible, the close in place with administrative controls corrective action alternative is appropriate because it will prevent inadvertent contact with the subsurface COCs and meets all applicable state and federal regulations for closure of the site. Post-closure monitoring will be conducted for one year. This monitoring will include using the lysimeter at HSM-3 and the data logger to measure precipitation-induced vadose zone moisture flow through the rock beneath the waste shaft at the Horn Silver Mine. Results of the monitoring will be documented in a letter report at the end of one year, anticipated in June 2005. A copy of this report will be submitted to the Nevada Division of Environmental Protection. After one year of monitoring, a determination will be made by the Nevada Division of Environmental Protection and U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office if future monitoring is needed or if use restriction boundaries need to be adjusted. If a large enough pulse of water moves into the lysimeter, a sample will he collected for laboratory analysis. If there is not sufficient volume of liquid collected for a sample or if no COCs are detected in collected samples at the end of this time period, it is recommended that the monitoring wells at the HSM be sealed in accordance with the State of Nevada regulations.

NONE

2004-08-01T23:59:59.000Z

494

Corrective Action Management Units and Temporary Units. RCRA Information Brief  

SciTech Connect (OSTI)

On February 16, 1993 the EPA published a final rule that allows either the EPA Regional Administrator or the authorized State to designate areas as corrective action management units (CAMUs) at hazardous waste management facilities for the specific purpose of managing remediation waste that has been generated as part of the facility`s corrective action activities. According to the rule, placement of remediation wastes into or within a CAMU does not constitute land disposal of hazardous waste and is not subject to RCRA land disposal restrictions. In addition, waste disposal units located within CAMUs are not required to be designed in accordance with RCRA minimum technological requirements applicable to land disposal units. This Information Brief explains the advantages of a CAMU designation, defines a Temporary Unit (TU) and explains the advantages of a TU designation. The process for initiating a CAMU or TU designation is described for DOE sites and interim status facilities.

Not Available

1994-03-01T23:59:59.000Z

495

Massachusetts state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

None

1981-02-09T23:59:59.000Z

496

Current activities handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

none,

1981-02-27T23:59:59.000Z

497

California state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

none,

1981-02-09T23:59:59.000Z

498

The Geometry of Supermanifolds and New Supersymmetric Actions  

E-Print Network [OSTI]

We construct the Hodge dual for supermanifolds by means of the Grassmannian Fourier transform of superforms. In the case of supermanifolds it is known that the superforms are not sufficient to construct a consistent integration theory and that the integral forms are needed. They are distribution-like forms which can be integrated on supermanifolds as a top form can be integrated on a conventional manifold. In our construction of the Hodge dual of superforms they arise naturally. The compatibility between Hodge duality and supersymmetry is exploited and applied to several examples. We define the irreducible representations of supersymmetry in terms of integral and superforms in a new way which can be easily generalised to several models in different dimensions. The construction of supersymmetric actions based on the Hodge duality is presented and new supersymmetric actions with higher derivative terms are found. These terms are required by the invertibility of the Hodge operator.

Castellani, L; Grassi, P A

2015-01-01T23:59:59.000Z

499

Hazardous Waste Remedial Actions Program annual progress report, FY 1990  

SciTech Connect (OSTI)

The Hazardous Waste Remedial Actions Programs (HAZWRAP), a unit of Martin Marietta Energy Systems, Inc., supports the Department of Energy (DOE) Oak Ridge Operations Office in broadly environmental areas, especially those relating to waste management and environmental restoration. HAZWRAP comprises six program areas, which are supported by central administrative and technical organizations. Existing programs deal with airborne hazardous substances, pollution prevention, remedial actions planning, environmental restoration, technology development, and information and data systems. HAZWRAP's mission to develop, promote, and apply-cost-effective hazardous waste management and environmental technologies to help solve national problems and concerns. HAZWRAP seeks to serve as integrator for hazardous waste and materials management across the federal government. It applies the unique combination of research and development (R D) capabilities, technologies, management expertise, and facilities in the Energy Systems complex to address problems of national importance. 24 figs., 10 tabs.

Not Available

1990-12-01T23:59:59.000Z

500

Pennsylvania state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z