Powered by Deep Web Technologies
Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Categorical Exclusion Determination Form Proposed Action Title: (0472-1518) Case Western Reserve University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18) Case Western Reserve University - 18) Case Western Reserve University - Transformation Enabled Nitride Magnets Absent Rare Earths Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Cleveland, OH Proposed Action Description: Funding will support the development of iron nitride (a"-Fe16(xx)N2) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Case Western Reserve University's application was selected for an initial 18- month period (Phase 1) of funding . The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

2

Environmental Assessment - Proposed Actions  

NLE Websites -- All DOE Office Websites (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

3

Description of Proposed Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

4

Riverland expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

5

Categorical Exclusion (CX) Determination Proposed Action: Havre Substation, Stage 03.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Havre Substation, Stage 03. Havre Substation, Stage 03. Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the Havre Substation approximately 150 ft to the north to accommodate a new delivery service from the newly built Herron Substation by Hill County. The expansion also converts the existing 115-kV single bus into a ring bus which will improve reliability. Western is also expanding the yard to the east to accommodate the replacement of the existing control building and control boards. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.11: Construction of electric power substations .. . or modification of existing substations and support facilities . Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

6

Implementation Proposal for the National Action Plan on Demand...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for the National Action Plan on Demand Response - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to...

7

N Springs expedited response action proposal  

SciTech Connect

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

8

Chapter 2 - Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES The WIPP facility, in addition to serving its primary mission as a TRU waste disposal site, needs to perform a variety of actinide chemistry experiments to (1) support WIPP's recertification efforts, (2) address scientific questions important to WIPP, (3) improve TRU waste characterization techniques, and (4) improve DOE's understanding of how the waste interacts with the natural environment in order to better understand waste isolation performance. In the past, WIPP-related actinide chemistry experiments have taken place at DOE laboratory facilities at other DOE sites such as LANL. However, due to reductions in travel budgets and additional security requirements being imposed on DOE weapons

9

Implementation Proposal for The National Action Plan on Demand Response |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

10

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(MOFs) that can be regenerated electrically for use in future high efficiency electric vehicle (EV) heat pumps. Proposed work consists of indoor laboratory-based research and...

11

Chapter 2 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

for the other proposed improvements based on a conceptually defined site "buildout" scenario. A bounding analysis uses simplifying assumptions and analytical methods that are...

12

ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE  

Office of Legacy Management (LM)

ACTION DESCRIPTION MEMORANDUM ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 1 Background and Need for Action ..................... 2 Proposed Remedial Action ........................ 3 Potential Issues ................... ......... 4 Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 6 Tables. ............ .................. 7 References ................... ............ 8

13

4.0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES 0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES This chapter evaluates the environmental consequences of the proposed action (Section 4.1) and of the alternatives (Section 4.2) . The analysis focuses primarily on impacts associated with routine operation of the glass melter. In some instances (such as human health) , additional analysis is provided for accident conditions. 4.1 THE PROPOSED ACTION The proposed action was evaluated to determine the potential impacts of a number of environmental components, including air quality, surface water quality, and biological resources, as well as the potential effects to human health and safety. The potential impacts to these receptors are evaluated in the following subsections. No impact pathways were identified for land use, socioeconomics, or groundwater resources.

14

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND 4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES . This section describes potential environmental impacts of the proposed action and alternatives. If the proposed action is implemented, activities would be limited to existing facilities. A WERF modification would be required to allow for injection of an atomized aqueous waste stream into the incinerator lower chamber. The installation would be performed within the WERF incinerator/stabilization building and may use an existing incinerator access port. Installation work would be similar to many routine maintenance and modification actions at WERF. A detailed analysis of potential impacts from processing INEL-generated LL W at commercial facilities is not presented in this EA because specific commercial facilities and processes have not

15

Categorical Exclusion (CX) Determination Proposed Action: Expansion of O'Fallon Creek Substation Yard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expansion of O'Fallon Creek Substation Yard Expansion of O'Fallon Creek Substation Yard Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the current yard to accommodate an additional bay for a dedicated electrical feed to a future oil pumping station that will be part of the Keystone XL project. Number and Title of Categorical Exclusions Being Applied: 10 CFR 10210410 Subpmi D, Appendix B, B4.11: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with the Regulatory Requirements for the National Environmental Policy Act at 10 CFR 1021AI0(b), require the following determinations be made in order for a proposed action to be categorically

16

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'u ", lt~Fs::::N 'u ", lt~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to construct a maintenance garage for heavy vehicles and equipment at the Springfield, Missouri facility. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 7,2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.15- Siting, construction or modification of support structures within or contiguous to an already developed area. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the

17

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

proposes to add additional shop and office space onto two existing facilities proposes to add additional shop and office space onto two existing facilities located at the Jonesboro, Arkansas Maintenance Facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: May 09, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0 , Part B1 .15- Siting, construction or modification, and operation of support buildings and structures within or contiguous to an already developed area . REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class,

18

Property:NEPA Proposed Action | Open Energy Information  

Open Energy Info (EERE)

Proposed Action Proposed Action Jump to: navigation, search Property Name NEPA Proposed Action Property Type Text Pages using the property "NEPA Proposed Action" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + NGP is proposing a geothermal development project which includes the construction and operation of power generation facilities, geothermal fluid production and injection well pads and wells, access roads, geothermal fluid pipelines, groundwater production wells, an electrical transmission line and switching station, and support facilities. NGP submitted an application (N-82701) and Plan of Development (PoD) to the BLM Winnemucca Field Office (WFO), for approval of a right-of-way (ROW) for those portions of the transmission line located on public lands managed by the BLM. SPPCo submitted an application (N-83479) to the BLM WFO for approval of a ROW for the electrical switching station to be built at the point of interconnection of the NGP transmission line with the existing SPPCo transmission line. An Operations Plan was submitted for approval to drill and test geothermal wells proposed on public land (within federal geothermal lease NVN-58196) which would be used for the project. A Utilization Plan was submitted for approval of utilization facilities proposed on public land to be used for the project. Geothermal Drilling Permits (GDPs) will be submitted for downhole casing and cementing engineering approval for each well as the project progresses.

19

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

install pole-mounted safety light(s) at the Gore, Oklahoma install pole-mounted safety light(s) at the Gore, Oklahoma substation facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: September 1, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0, Part B2.3- Installation of equipment for personnel safety and health. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A& B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the proposal must riot: (a.) Threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, including DOE and/or Executive Orders;

20

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Power Administration and the system of Entergy in Carroll County, Arkansas. The interconnection would require Entergy to construct a new switching station at the interconnection site in addition to an approximately 5 mile length of transmission line. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: April 11,2011 NUMBERS AND TIT!-ES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.12- Construction of electric powerlines approximately 10 miles in length or less, not integrating major new sources. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Microsoft Word - Updated Proposed Action 2004 SA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2004 December 27, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE/EIS-0312/SA-01) Sarah McNary Senior Policy Advisor Proposed Action: Updated Proposed Action (UPA) for the FCRPS Biological Opinion Remand Location: The action area of the UPA, including areas where the UPA directly or indirectly affects listed salmonids consists of the following areas: * The mainstem Columbia River, including and downstream of Libby and Hungry Horse dams and reservoirs; the Snake River below the confluence with the Salmon River; and the Clearwater River below Dworshak reservoir and dam, down to and including the Columbia River estuary and plume. * The estuary and plume, which includes the area immediately off the mouth of the Columbia

22

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'IU "~I :~~~r;::::N 'IU "~I :~~~r;::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to perform aerial saw tree trimming activities along select portions of transmission line rights-of-ways located in eastern Oklahoma during the early winter of 2011. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 10, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.3- Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and railroads), vehicles and equipment, and localized vegetation and pest control, during which operations may be suspended and resumed.

23

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

NLE Websites -- All DOE Office Websites (Extended Search)

CATEGORICAL EXCLUSION (CX) DETERMINATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of

24

CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Zi~Fs::::N Zi~Fs::::N CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to accommodate a request, on behalf of Farrell- Cooper Mining Company, to lower and bury a small section of Southwestern's electrical lines to allow for the crossing of a large piece of mining equipment through the transmission line rights-of-way in Haskell County, Oklahoma. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart D, Part B4.9- Grant or denial of requests for multiple use of transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and

25

Aspects of Western Refining, Inc.'s Proposed Acquisition of Giant Industries, Inc.  

Reports and Publications (EIA)

Presentation of company-level, non-proprietary data and relevant aggregate data for U.S. refinery capacity and gasoline marketing of Western Refining and Giant Industries to inform discussions of Western Refining Inc.'s proposed acquisition of Giant Industries Inc. for a total of $1.5 billion, which was announced August 28, 2006.

Neal Davis

2006-09-12T23:59:59.000Z

26

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~~Fs::::N ~~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration performed emergency construction activities to repair a levee, stabilize a bank, and complete drainage improvements as a result of damage incurred during recent heavy rains at the Jonesboro Maintenance Office and adjacent substation facility located in Craighead County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart 0 , Part B 2.5- Safety and environmental improvements of a facility, including replacement and upgrade of facility components, that do not result in a significant change in the

27

Sodium Dichromate Barrel Landfill expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Sodium Dichromate Barrel Landfill. The Sodium Dichromate Barrel Disposal Site was used in 1945 for disposal of crushed barrels. The site location is the sole waste site within the 100-IU-4 Operable Unit. The Waste Information Data System (WIDS 1992) assumes that the crushed barrels contained 1% residual sodium dichromate at burial time and that only buried crushed barrels are at the site. Burial depth is shallow since visual inspection finds numerous barrel debris on the surface. A non-time-critical ERA proposal includes preparation of an engineering evaluation and cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the landfill is the only waste site within the operable unit, the ERA will present a final remediation of the 100-IU-4 operable unit.

Not Available

1993-09-01T23:59:59.000Z

28

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Southwestern) proposes to replace the shield wire, fiber-optic cable, (Southwestern) proposes to replace the shield wire, fiber-optic cable, conductor, structures, and all associated hardware on the Idalia to Asherville 161 kV, 22 mile transmission line located in Butler and Stoddard County, Missouri. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: October 13,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including , but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors,

29

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Oklahoma, and Missouri communication tower facilities to facilitate the spectrum relocation of Federal communications systems in conjunction with the Commercial Spectrum Enhancement Act (CSEA, Title II of P.L. 108-494). Communication tower facility modifications and construction activities include 13 tower replacements, 16 tower removals, and 6 communication site dispositions. The 35 tower project locations, identified by state, include: ~ Arkansas- Hardy, Melbourne, Paragould, Piggott, Bethel, Bull Shoals, Norfork, Piggott, Poteau Mountain, Decatur, Sulphur Rock, Van Buren, Winesburg, and Humphrey ~ Oklahoma- Broken Bow Project Office, Broken Bow Powerhouse, Gore Substation, Lamar, Weleetka,

30

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

obtain an easement for an existing access road obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of the transferred structures and equipment, for residential, commercial, or industrial uses. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B):

31

SB 4 Interim Well Stimulation Treatment Regulations Notice of Proposed Emergency Rulemaking Action  

E-Print Network (OSTI)

SB 4 Interim Well Stimulation Treatment Regulations Notice of Proposed Emergency Rulemaking Action Page 1 of 10 SB 4 INTERIM WELL STIMULATION TREATMENT REGULATIONS NOTICE OF PROPOSED EMERGENCY that the California Department of Conservation (Department) proposes to adopt emergency regulations necessary

32

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

385: Notice of Proposed Floodplain and Wetland Actions 385: Notice of Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

33

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Floodplain and Wetland Actions Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

34

Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nergy nergy Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories - Improved Power System Operations Using Advanced Stochastic Optimization Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): New Mexico, Iowa, Massachusetts, Washington, and California Proposed Action Description: Funding will support development of an integrated probabilistic decision-making software that can account for uncertain conditions that affect renewable energy sources to ensure reliable and efficient use of power system assets and enforce AC power flow constraints. Proposed work consists of (1) developing a two-stage optimized algorithm for the stochastic unit commitment and economic dispatch and pricing

35

Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rtm nt n rgy rtm nt n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station - Robust Adaptive Topology Control (RATC) Program or Pield Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Texas, Arizona, California, New Jersey, and Tennessee. Proposed Action Description: Funding will support development an algorithmic Topology Control software to enable real-time, automated control over the transmissions lines within the electricity grid during unexpected power supply interruptions caused by intermittent availability of renewable generation sources, and cascading network failures due to extreme operating conditions or malicious attacks. Proposed work consists of (1) developing a fast, adaptive topology control algorithm to identify actions that will mitigate effects of unexpected

36

Proposed framework for the Western Area Power Administration Environmental Risk Management Program  

Science Conference Proceedings (OSTI)

The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J. [Pacific Northwest Lab., Richland, WA (United States); Roybal, A.L. [Western Area Power Administration, Golden, CO (United States)

1994-12-01T23:59:59.000Z

37

Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rg rg Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center - Thermal Storage Using Hybrid Vapor Compression Adsorption System Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): Connecticut, Michigan Proposed Action Description: Funding will support development of an advanced climate control system for plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) utilizing a hybrid thermal battery that employs a unique approach of adsorbing refrigerant on a metal salt. Proposed work consists of indoor laboratory-based research and development and office-based engineering analysis, including (1) synthesis, characterization, and testing of metal salts and refrigerant fluids for use in the thermal battery system, (2) computer-based design and

38

Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'Department of Energy 'Department of Energy Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) - Chilled Natural Gas for At-Home Refueling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Troy, NY; Columbia, MO Proposed Action Description: Funding will support efforts to develop a compressor technology for at-home refueling of natural gas vehicles. Proposed work will consist of: (1) development, synthesis, and testing of small quantities of adsorbent material at a dedicated laboratory facility on the University of Missouri campus in Columbia, MO; (2) design, fabrication (or procurement), and testing of compressor system components, including a cryocooler and an accumulator, at Chart Industries, Inc.'s commercial development and assembly site in Troy, NY; and (3) assembly

39

Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment n rgy partment n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. - Highly Dispatchable and Distributed Demand Response for the Integration of Distributed Generation Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): California and New York Proposed Action Description: Funding will support development a highly distributed Demand Response Optimization and Management System for Real-time (DROMS-RT) power flow control software to support large scale integration of distributed renewable generation sources into the electricity grid. Proposed work consists of (1) developing a web-based software platform to enable full DROMS-RT functionality; (2) developing standards for

40

Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rgy rgy ·Submitby£-mail Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. - Dual Bi-Directional Silicon IGBTs Modules Enables Breakthrough PV Inverter Using Current-Modulation Topology Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCitY/County/State): California, New York, Virginia, Texas Proposed Action Description: Funding will support development of a low-cost, high-efficiency 100 kW power inverter to connect photovoltaic (PV) solar panels to the grid, using revolutionary bi-directiona linsulated gate bipolar transistor (BD-IGBT) switches and dual chip modules. Proposed work consists of indoor laboratory-based research and development (R&D) and semiconductor fabrication, including (1) device

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment of n rgy partment of n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research - Nanoclay-reinforced Ethylene-Propylene-Rubber for Low Cost HVDC Cabling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) (City/County/State): Niskayuna, NY Proposed Action Description: Funding will support development of a low cost, extrudable, nanoclay-reinforced ethylene-propylene-rubber (EPR) for making high voltage direct current (HVDC) cable. Proposed work will consist of (1) indoor, laboratory-based synthesis, characterization, and testing of nanoclay-reinforced EPR and (2) computer- based modeling of the performance characteristics and production cost of the nanoclay-reinforced EPR HVDC cable at full scale.

42

Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partme t nerg partme t nerg Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory - Reversible Metal Hydride Thermal Storage for High Temeprative Power Generation Systems Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah and Washington Proposed Action Description: Funding will support development of a novel, metal hydride-based thermal energy storage (TES) system for use with concentrated solar power or nuclear power generating systems. Proposed work consists of indoor laboratory-based research and development, including (1) materials synthesis, characterization, and testing to develop and optimize reversible metal hydride materials, (2) design and fabrication of a bench-scale 3kWh prototype TES unit, and (3) testing,

43

Anadarko's Proposed Acquisition of Kerr-McGee and Western Gas Resources, June 23, 2006, Background  

Gasoline and Diesel Fuel Update (EIA)

Aspects of Anadarko's Acquisition of Kerr-McGee Aspects of Anadarko's Acquisition of Kerr-McGee Corp. and Western Gas Resources Background On June 23, 2006, the Wall Street Journal (WSJ) reported that Anadarko Petroleum Corp had agreed to acquire Kerr-McGee Corp. and Western Gas Resources Inc. for $21.1 billion of cash (see "Anadarko to Buy Kerr-McGee, Western Gas for $21.1 Billion" (June 23, 2006)). Anadarko also will assume $2.2 billion of debt from the two companies. Anadarko will pay $16.4 billion ($70.50 per share) and assume $1.6 billion of debt to acquire Kerr-McGee and pay $4.7 billion ($61 per share) and assume $600 million of debt to acquire Western Gas. Additional information is available on Anadarko's web site. According to the WSJ, Anadarko's president and chief executive officer Jim Hacket noted that the

44

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

45

Categorical Exclusion Determination Form Proposed Action Title: (0675-1511) Ford Motor Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11) Ford Motor Company - 11) Ford Motor Company - High Precision Tester for Automotive and Stationary Batteries Program or Field Office:Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Dearborn, MI; Albuquerque, NM; College Station, TX Proposed Action Description: Funding will support efforts to develop a high precision battery tester to measure key battery characteristics during charge/discharge cycles to improve the accuracy and precision of Columbic Efficiency and predicted life expectancy estimates. Proposed work will consist of: (1) development and validation of a low current battery tester that meets established performance objectives and (2) development and validation a high current battery tester that meets established performance objectives.

46

Categorical Exclusion Determination Form Proposed Action Title: (0473-1543) Georgia Tech Research Corporation-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1543) Georgia Tech Research Corporation- 3-1543) Georgia Tech Research Corporation- Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-Reliable Green Electricity Internetworks Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Georgia Proposed Action Description: Funding will support development of an internet-like software architecture capable of independently controlling and coordinating distributed energy sources generated by "prosumers," such as wind and solar power, to improve the reliability, efficiency, flexibility, and communications within the electrical grid. Proposed work consists of (1) developing an independently networked inverter controller that incorporates Kuramoto oscillators to reduce required

47

Categorical Exclusion Determination Form Proposed Action Title: (0470-1541) Chromatin Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41) Chromatin Inc. - 41) Chromatin Inc. - Plant Based Sesquiterpene Biofuels Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Kansas, Kentucky, Illinois, Ohio Proposed Action Description: Funding will support development of genetically modified (GM) sweet sorghum (Sorghum bicolor) to produce increased levels of farnesene , a drop-in biofuel. Proposed work will consist of (1) transforming sweet sorghum with mini-chromosomes carrying limiting genes and metabolic pathway genes to increase farnesene synthesis; (2) evaluating and optimizing genes from plants, E. coli, and yeast (Saccharomyces cerevisiae) to improve enzymatic activity and specificity; (3) testing plasmid constructs and evaluating optimized genes in a model plant, guayule

48

Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action  

SciTech Connect

This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

Not Available

1993-12-01T23:59:59.000Z

49

Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection  

DOE Green Energy (OSTI)

This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increases on the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert.

King, J.; Kirby, B.; Milligan, M.; Beuning, S.

2012-05-01T23:59:59.000Z

50

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance Appliance Standards Program The FY 2003 Priority- Setting Summary Report and Actions Proposed Date: August 22, 2002 Table of Contents i EXECUTIVE SUMMARY.............................................................................................. iv 1 Energy Conservation Program - Product Prioritization Process.......1-1 1.1 Background on Appliance Standards Program........................................... 1-1 1.2 DOE Authority to Add Products ................................................................ 1-2 1.2.1 Consumer Products .................................................................................... 1-3 1.2.2 Commercial Products................................................................................. 1-5 1.2.2.1 Products Regulated under EPCA Provisions Concerning Consumer

51

Categorical Exclusion Determination Form Proposed Action Title: (0474-1592) Satcon Technology Corp. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-1592) Satcon Technology Corp. - 4-1592) Satcon Technology Corp. - Agile Direct Grid Connect Medium Voltage 4.7-13.8kV Power Converter for PV Applications Utilizing Advanced Wide Band Gap Devices Program or Field Office:Advanced Research Projects Agency - Energy Location{s) (City/County/State): Massachusetts, New Mexico, North Carolina, Pennsylvania Proposed Action Description: Funding will support development of an early stage prototype of a solid-state power inverter capable of converting low-voltage input power generated by utility-scale solar farms to medium voltage AC output power for transmission to the electric grid, increasing energy yield and reducing equipment costs. Proposed work consists of indoor laboratory-based research and development (R&D) and device testing, including (1) design, fabrication, and

52

Categorical Exclusion Determination Form Proposed Action Title: (0675-1570) Washington University in St. Louis -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) Washington University in St. Louis - 0) Washington University in St. Louis - Optimal Operation and Management of Energy Storage Systems Based on Real-Time Predictive Modeling and Adaptive Battery Management Techniques Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): St. Louis, MO; Golden, CO Proposed Action Description: Funding will support efforts to develop a battery management system for electric vehicle batteries capable of accurately predicting a battery's charge and health in order to make control decisions that improve battery safety, charging rate, useful capacity, and battery lifetime. Proposed work will consist of: (1) development of baseline physics models for the battery management; (2) optimization of the baseline physics

53

Categorical Exclusion Determination Form Proposed Action Title: (0470-1532) Arcadia Biosciences, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32) Arcadia Biosciences, Inc. - 32) Arcadia Biosciences, Inc. - Vegetative Production of Oil in a C4 Crop Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Davis, CA Proposed Action Description: Funding will support development of genetically modified (GM) Setaria viridis (Setaria) that produces triacylglycerol (vegetable oil) in the tissues of I. the plant in place of starch. If the work performed under the award is successful, Arcadia will incorporate the gene combinations developed in _ Setaria into sorghum. Proposed work will consist of laboratory-based (1) genetic modification of E. coli to construct vectors for implementing oil production genes in Setaria; (2) genetic modification of Setaria to express gene combinations for three different pathways that are critical to oil synthesis; and (3)

54

Categorical Exclusion Determination Form Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97) Smart Wire Grid, Inc. - 97) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): California, Missouri, North Carolina, Georgia, Wash ington, Pennsylvania, and Tennessee Proposed Action Description: Funding will support development of a Smart Wire System Controller and an energy router software to enable distributed agents to coordinate with the control center, improve power flow control, and take advantage of unused capacity within the existing transmission system. In addition, the power controller will enable grid operators to optimize transmission assets to fully integrate variable renewable energy sources. Proposed work consists of (1) designing, developing, testing, and optimizing the Smart Wire System Controller to meet utility specifications; (2)

55

Categorical Exclusion Determination Form Proposed Action Title: (0674-1585) Xilectric, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

585) Xilectric, Inc. - 585) Xilectric, Inc. - Low Cost Transportation Batteries Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): University of Rhode Island (Kingston, RI); Electrosynthesis, Inc. (Lancaster, NY) Proposed Action Description: Submit by E-mail JI Funding will support efforts to develop a new class of low-cost rechargeable battery chemistries based on the Edison battery chemistry that have the potential to exceed energy densities of 400 Wh/kg and 600 Wh/L at a battery materials cost less than $50/kWh. These battery systems will be built from materials that are earth-abundant, environmentally friendly, and cheap with a cell architecture that is inexpensive to manufacture and electrode structures expected to have extremely long cycle life. Proposed work will consist of: (1) testing, thermodynamic characterization, and

56

Proposed Action Title: (0470-1517) Donald Danforth Plant Science Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(0470-1517) Donald Danforth Plant Science Center - (0470-1517) Donald Danforth Plant Science Center - Center for Enahnced Camelina Oil Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Michigan, Missouri, Montana, Nebraska, New Mexico Proposed Action Description: Funding will support development of genetically modified (GM) camelina that grows at an increased yield and produces more seed oil than wild- type camelina for use as a biofuel feedstock. Proposed work will consist of (1) genetically modifying camelina to improve carbon capturel assimilation and light utilization, and to redirect carbon flux towards seed oil synthesis, including synthesis of oleic acid; (2) fabricating and testing phenomics chambers used to analyze plant metabolism under varying conditions (e.g. humidity, temperature); (3) growing selected lines of non-GM, wild-type camelina in contained

57

Categorical Exclusion Determination Form Proposed Action Title: (0675-1578) Robert Bosch LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8) Robert Bosch LLC - 8) Robert Bosch LLC - Advanced Battery Management System Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): Bosch RTC (Palo Alto, CA); Cobasys, LLC (Orion, MI); University of California - San Diego (San Diego, CA) Proposed Action Description: Funding will support efforts to develop an adaptive battery management system that controls battery charging and discharging so as to enable fuller, more efficient battery utilization . Proposed work will consist of: (1 ) development of real-time estimation and control strategies for estimating battery performance; (2) design , development, and fabrication of small-scale Lithium-ion battery cells with an electrochemical-based battery management system; and (3) conducting analytical modeling and testing to characterize and validate system performance.

58

Categorical Exclusion Determination Form Proposed Action Title: (0674-1610) TVN Systems, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

610) TVN Systems, Inc. - 610) TVN Systems, Inc. - Hydrogen/Bromine Electrical Energy Storage System Program or Field Office :Advanced Research Projects Agency - Energy (ARPA-E) Submit by E-mail LocationCs) CCity/County/State): TVN Systems, Inc. (Lawrence, KS); Vanderbilt University (Nashville, TN); University of Kansas (Lawrence, KS) Proposed Action Description: Funding will support efforts to develop a cost-effective hydrogen-bromine flow battery that utilizes advanced membrane materials, unique catalysts, a novel shunt current protection system , and advanced cell and system designs. Proposed work will consist of: (1) synthesizing active and stable Rhodium-sulfer based electro-catalytic materials for hydrogen reactions; (2) fabricating and testing nanofiber composite membranes;

59

Categorical Exclusion Determination Form Proposed Action Title: (0473-1520) Michigan State Un  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1520) Michigan State Un 3-1520) Michigan State Un iversity - Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): East Lansing, MI Proposed Action Description: Funding will support the development of a transformer-less unified power flow controller (UPFC) that can efficiently and economically control distributed and intermittent power flow generated by wind and solar power sources through existing transmission lines. Proposed work will consist of indoor activities to (1) engage in a system-level simulation of the new UPFC with a real-time simulator; (2) design, develop , and electronically fabricate three prototype 15-kV/1.5-MVA transformer-less UPFCs; (3) construct a temporary, 15-kV mobile testing

60

Categorical Exclusion Determination Form Proposed Action Title: (0208-1695) Sustainable Energy Solutions LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

208-1695) Sustainable Energy Solutions LLC - 208-1695) Sustainable Energy Solutions LLC - Cryogenic Carbon Capture (Phase 2) Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah; Wyoming Proposed Action Description: Funding will support development of a cryogenic carbon capture (CCC) process for separating carbon dioxide from flue gas via desublimination of the flue gas and compression of the resulting solid and liquid products. Proposed work will consist of (1) design, fabrication/acquisition, and testing of components for the pilot-scale prototype CCC system; (2) integration of the components into a skid-mounted, pilot-scale prototype CCC system; and (3) testing of the skid-mounted, pilot-scale prototype CCC system using actual or simulated flue gas streams.

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion Determination Form Proposed Action Title: (0675-1534) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34) GE Global Research - 34) GE Global Research - Control Enabling Solutions with Ultrathin Strain and Temperature Sensor System for Reduced Battery Life Cycle Cost Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Ann Arbor, MI; Dearborn, MI Proposed Action Description: Funding will support efforts to develop a a novel sensor system with supporting multi-physics models to increase battery cell lifetime and extend battery range for electric vehicle applications. Proposed work will consist of: (1) development and fabrication a novel multi-measurand sensor capable of measuring strain and temperature across multiple battery cells; (2) performance of strain and temperature testing and development and validation of multi-physics models; (3)

62

Categorical Exclusion Determination Form Proposed Action Title: (0473-1529) Charles River Associates International Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29) Charles River Associates International Inc. - 29) Charles River Associates International Inc. - Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Massachusetts, Pennsylvania, Washington Proposed Action Description: Funding will support development of Topology Control, an algorithmic and software technology framework that will improve the efficiency of the electrical grid by implementing appropriate short-term changes of transmission line status to manage transmission congestion and uncertainties associated with integration of renewable generation sources into the electricity grid. Proposed work consists of (1) developing and validating a large power system model that accurately simulates day-ahead and intra-day power

63

Executive Director for Operations /RA/ SUBJECT: PROPOSED RULEMAKINGPOST-FIRE OPERATOR MANUAL ACTIONS (RIN 3150  

E-Print Network (OSTI)

To obtain Commission approval to publish the proposed rule, including the issue of the need for an interim enforcement discretion policy and make available the draft regulatory guide and other supporting documents for public comment. BACKGROUND: In SECY-03-0100, Rulemaking Plan on Post-Fire Operator Manual Actions, dated June 17, 2003, the staff recommended revising the existing fire protection regulation in paragraph III.G.2 of Appendix R to 10 CFR Part 50 to include operator manual actions. These actions are needed to ensure that a redundant train of systems necessary to achieve and maintain hot shutdown conditions located within the same area outside the primary containment is free of fire damage. In an SRM dated September 12, 2003, the Commission approved the staffs recommendation to revise the fire protection program requirements in Appendix R and the associated guidance. The Commission also approved the staffs plan to develop an interim enforcement policy to deal with compliance issues until the guidance and final rule are implemented. CONTACT:

Luis A. Reyes; David Diec Nrr/drip

2004-01-01T23:59:59.000Z

64

Categorical Exclusion Determination Form Proposed Action Title: (0472-1537) Northeastern University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37) Northeastern University - 37) Northeastern University - Multiscale Development of L 10 Materials for Rare-Earth-Free Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): New York, Michigan, Massachusetts, and Nebraska. Proposed Action Description: Funding will support the development of an ultra-strong ferromagnetic magnet material with a tetragonal L 10 structure, that does not contain rare earth materials and is designed for use in clean energy technologies such as electric vehicle motors and wind turbine generators. Northeastern University's application was selected for an initial 18-month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated

65

Categorical Exclusion Determination Form Proposed Action Title: (0472-1545) Dartmouth College -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45) Dartmouth College - 45) Dartmouth College - Nanocrystalline T-MnAI Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Hanover, NH Proposed Action Description: Funding will support the development of manganese-aluminum (T-MnAI) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Dartmouth College's application was selected for an initial 18- month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional H3-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

66

Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 2 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES Some types of experiments are best (or only) performed deep underground. For this reason, scientists have considered WIPP as a potential site for these types of experiments and have sought permission from DOE to conduct several types of experiments there. As an example, astrophysicists are searching for very small particles with no charge called neutrinos. These particles are so small that they typically pass through the Earth. The only way to detect them is to look for them using facilities as far underground as possible so that the Earth's surface layers filter out other cosmic particles and radiation. The first basic astrophysics-like experiments were begun at WIPP in 1993 by LANL scientists who used

67

Finding of no significant impact proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida  

SciTech Connect

The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-0976) of the proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida. The Northeast Site contains contaminated groundwater that would be removed, treated, and discharged to the Pinellas County Sewer System. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C.4321 et.seq. Therefore, the preparation of an environmental impact statement is not required and the DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1995-06-01T23:59:59.000Z

68

A Proposal for Analyzing and Forecasting Lower-Atmospheric Undular Bores in the Western Gulf of Mexico Region  

Science Conference Proceedings (OSTI)

A method is presented for analyzing and forecasting the occurrence of lower-atmospheric undular bores over the western and central Gulf of Mexico (GOM) and adjacent land areas using standard operational forecasting and analysis techniques. The ...

Philip A. Lutzak

2013-02-01T23:59:59.000Z

69

US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule  

Science Conference Proceedings (OSTI)

The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project, as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.

Not Available

1988-01-29T23:59:59.000Z

70

Notice of Proposed Floodplain and Wetlands Actions (DOE/EIS-0385) (03/28/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

398 Federal Register 398 Federal Register / Vol. 71, No. 59 / Tuesday, March 28, 2006 / Notices conditions that could result in an accidental or unauthorized detonation of nuclear explosives. Comments are invited on: (a) Whether the extended collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques

71

A model for determining when an analysis contains sufficient detail to provide adequate NEPA coverage for a proposed action  

SciTech Connect

Neither the National Environmental Policy Act (NEPA) nor its subsequent regulations provide substantive guidance for determining the Level of detail, discussion, and analysis that is sufficient to adequately cover a proposed action. Yet, decisionmakers are routinely confronted with the problem of making such determinations. Experience has shown that no two decisionmakers are Likely to completely agree on the amount of discussion that is sufficient to adequately cover a proposed action. one decisionmaker may determine that a certain Level of analysis is adequate, while another may conclude the exact opposite. Achieving a consensus within the agency and among the public can be problematic. Lacking definitive guidance, decisionmakers and critics alike may point to a universe of potential factors as the basis for defending their claim that an action is or is not adequately covered. Experience indicates that assertions are often based on ambiguous opinions that can be neither proved nor disproved. Lack of definitive guidance slows the decisionmaking process and can result in project delays. Furthermore, it can also Lead to inconsistencies in decisionmaking, inappropriate Levels of NEPA documentation, and increased risk of a project being challenged for inadequate coverage. A more systematic and less subjective approach for making such determinations is obviously needed. A paradigm for reducing the degree of subjectivity inherent in such decisions is presented in the following paper. The model is specifically designed to expedite the decisionmaking process by providing a systematic approach for making these determination. In many cases, agencies may find that using this model can reduce the analysis and size of NEPA documents.

Eccleston, C.H.

1994-11-01T23:59:59.000Z

72

Well Completion Report for Well ER-20-11, Corrective Action Units 101 and 102: Central and Western Pahute Mesa  

Science Conference Proceedings (OSTI)

Well ER-20-11 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Management Operations Underground Test Area (UGTA) Activity at the Nevada National Security Site (formerly Nevada Test Site), Nye County, Nevada. The well was drilled in September 2012 as part of the Central and Western Pahute Mesa Corrective Action Unit Phase II drilling program. Well ER-20-11 was constructed to further investigate the nature and extent of radionuclidecontaminated groundwater encountered in two nearby UGTA wells, to help define hydraulic and transport parameters for the contaminated Benham aquifer, and to provide data for the UGTA hydrostratigraphic framework model. The 44.5-centimeter (cm) surface hole was drilled to a depth of 520.0 meters (m) and cased with 34.0-cm casing to 511.5 m. The hole diameter was then decreased to 31.1 cm, and the borehole was drilled to a total depth of 915.6 m. The hole was completed to allow access for hydrologic testing and sampling in the target aquifer, which is a lava-flow aquifer known as the Benham aquifer. The completion casing string, set to the depth of 904.3 m, consists of a string of 6?-inch (in.) stainless-steel casing hanging from a string of 7?-in. carbon-steel casing. The stainless-steel casing has one slotted interval at 796.3 to 903.6 m. One piezometer string was installed, which consists of 2?-in. stainless-steel tubing that hangs from 2?-in. carbon-steel tubing via a crossover sub. This string was landed at 903.8 m and is slotted in the interval 795.3 to 903.1 m. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, fluid samples (for groundwater chemistry analysis and tritium measurements), and water-level measurements. The well penetrated 915.6 m of Tertiary volcanic rock, including one saturated lava flow aquifer. Measurements on samples taken from the undeveloped well indicated elevated tritium levels within the Benham aquifer. The maximum tritium level measured with field equipment was 146,131 picocuries per liter from a sample obtained at the depth of 912.0 m. The fluid level was measured in the piezometer string at a depth of 504.5 m on September 26, 2012. All Fluid Management Plan (FMP) requirements for Well ER-20-11 were met. Analysis of monitoring samples and FMP confirmatory samples indicated that fluids generated during drilling at Well ER-20-11 met the FMP criteria for discharge to an unlined sump or designated infiltration area. Well development, hydrologic testing, and sampling will be conducted at a later date.

NSTec Environmental Management

2013-02-27T23:59:59.000Z

73

Completion Report for Well ER-EC-14, Corrective Action Units 101 and 102: Central and Western Pahute Mesa  

Science Conference Proceedings (OSTI)

Well ER-EC-14 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Management Operations Underground Test Area (UGTA) Activity at the Nevada National Security Site (NNSS; formerly Nevada Test Site), Nye County, Nevada. The well was drilled in September and October 2012, as part of the Central and Western Pahute Mesa Corrective Action Unit Phase II drilling program. The primary purpose of the well was to provide detailed hydrogeologic information for the Fortymile Canyon composite hydrostratigraphic unit in the Timber Mountain moat area, within the Timber Mountain caldera complex, that will help address uncertainties within the Pahute MesaOasis Valley hydrostratigraphic framework model. The main 55.9-centimeter (cm) hole was drilled to a total depth of 325.5 meters (m) and cased with 40.6-cm casing to 308.1 m. The hole diameter was then decreased to 37.5 cm, and drilling continued to a total depth of 724.8 m. The completion casing string, set to the depth of 690.9 m, consists of 16.8-cm stainless-steel casing hanging from 19.4-cm carbon-steel casing. The stainless-steel casing has two slotted intervals open to the Rainier Mesa Tuff. Two piezometer strings were installed in Well ER-EC-14. Both piezometer strings, each with one slotted interval, consist of 6.0-cm carbon-steel tubing at the surface, then cross over to 7.3-cm stainless-steel tubing just above the water table. The shallow piezometer string was landed at 507.8 m, and the deep piezometer string was landed at 688.6 m. Both piezometer strings are set to monitor groundwater within moderately to densely welded Rainier Mesa Tuff. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, water quality (including tritium and other radionuclides) measurements, and water level measurements. The well penetrated 15.2 m of alluvium and 709.6 m of Tertiary volcanic rocks. The stratigraphy and general lithology were not as expected due to the position of Well ER-EC-14 relative to the buried caldera margins of the Timber Mountain caldera complex. The well is located inside the Rainier Mesa caldera, but outside the younger Ammonia Tanks caldera. On November 5, 2012, a preliminary fluid level in the shallow piezometer string was measured at the depth of 311.8 m. This water level depth was taken before installation of the bridge plug (to be placed within the main completion casing to separate the two slotted zones). Well development, hydrologic testing, and sampling, will be conducted at a later date. No tritium above levels detectable by field methods were encountered in this hole. All Fluid Management Plan (FMP) requirements for Well ER-EC-14 were met. Analysis of monitoring samples and FMP confirmatory samples indicated that fluids generated during drilling at Well ER-EC-14 met the FMP criteria for discharge to an unlined sump or designated infiltration area. All sanitary and hydrocarbon waste generated was properly handled and disposed of.

None

2013-03-05T23:59:59.000Z

74

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

75

Notices DEPARTMENT OF ENERGY Western Area Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

64 Federal Register 64 Federal Register / Vol. 78, No. 224 / Wednesday, November 20, 2013 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare a Supplemental Draft Environmental Impact Statement-Interconnection of the Proposed Wilton IV Wind Energy Center Project, North Dakota (DOE/ EIS-0469) AGENCY: Western Area Power Administration, DOE. ACTION: Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement and to Conduct a Scoping Meeting; Notice of Floodplain and Wetlands Involvement. SUMMARY: Western Area Power Administration (Western), an agency of the U.S. Department of Energy (DOE), intends to prepare a Supplemental Draft Environmental Impact Statement (SDEIS) for the interconnection of NextEra Energy Resources' proposed

76

Western Area Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Loveland Area Projects November 29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development of the 2025 PMI Proposal * 2025 PMI Proposal * 2025 PMI Comment Period & Proposal Information * Questions 3 Overview of Western Area Power Administration (Western) * One of four power marketing administrations within the Department of Energy * Mission: Market and deliver reliable, renewable, cost-based Federal hydroelectric power and related services within a 15-state region of the central and western U.S. * Vision: Provide premier power marketing and transmission services Rocky Mountain Region (RMR) is one of five regional offices 4 Rocky Mountain Region

77

Gulf of Mexico Sales 147 and 150: Central and western planning areas. Volume 2, Sections 4.D. through 9: Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Volume II contains: environmental consequences, part D which includes environmental impacts of the proposed actions and alternatives for the proposed Central Gulf sale 147 and for the proposed Western Gulf sale 150; consultation and coordination; bibliography and special references; preparers; glossary; and appendices.

Not Available

1993-11-01T23:59:59.000Z

78

DOE/EA-1611: Mitigation Action Plan for the Colorado Highlands Wind Project, Logan County, Colorado (01/19/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 19, 2009 January 19, 2009 Mitigation Action Plan Colorado Highlands Wind Project Logan County, Colorado Project Overview. Western Area Power Administration (Western) a power marketing agency of the U.S. Department of Energy (DOE) proposes to approve interconnection of the Project with Western's transmission system and the connected action of the Project. Colorado Highlands Wind LLC (CHWP) applied (via predecessor project owner Wind Energy Prototypes) to Western to interconnect a 90-megawatt (MW) wind power facility with Western's existing Sterling-Frenchman Creek 115-kV transmission line. Approval of the Interconnection Agreement would allow the Project to interconnect with Western's proposed Wildhorse Creek Switchyard. In accordance with the DOE NEPA

79

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

80

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY S-1 SUMMARY This environmental impact statement (EIS) has been prepared by the United States Department of Energy (DOE), in compliance with the National Environmental Policy Act of 1969 (NEPA) as amended (42 USC 4321 et seq.), to evaluate the potential environmental impacts associated with the construction and demonstration of a 98-megawatt (MWe) net power plant and cement manufacturing facility (the "Co- Production Facility"). The responsible organization for the federal action is the National Energy Technology Laboratory (NETL), a multi-purpose laboratory owned and operated by DOE. Proposed Action The Proposed Action is for DOE to decide whether to provide financial assistance to Western

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Proposed Energy Transport Corridors: West-wide energy corridor programmatic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Transport Corridors: West-wide energy corridor Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the environmental impacts from the proposed action and the range of reasonable alternatives. The proposed action calls for designating more than 6,000 miles of energy transport corridors across the West. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. More Documents & Publications

82

EA-1611: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1611: Mitigation Action Plan Colorado Highlands Wind Project, Logan County, Colorado Colorado Highlands Wind LLC applied to Western Area Power...

83

Gulf of Mexico Sales 147 and 150: Central and Western planning areas. Final environmental impact statement, Volume 1: Sections 1 through 4.C  

SciTech Connect

This Final Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales [Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)]. This document includes the purpose and background of the proposed actions, the alternatives, the descriptions of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities.

Not Available

1993-11-01T23:59:59.000Z

84

EA-1855: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan (MAP) is part of the Finding of No Significant Impact for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves...

85

Implementation Proposal for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

86

ARM - Submitting Proposals : Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

87

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

54) Varentec Inc. - Compact Dynamic Phase Angle Regulators for Transmission Power Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City...

88

Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Process R&D Overview 100G Testbed Testbed Description Testbed Results Current Testbed Research Proposal Process Terms and Conditions Virtual Circuits (OSCARS) Performance...

89

To the Western Governors:  

E-Print Network (OSTI)

The Clean and Diversified Energy Advisory Committee (CDEAC) is pleased to present you with its report and recommendations for achieving and potentially exceeding your clean and diversified energy objectives. This report represents the culmination of an enormous effort by hundreds of individuals representing a broad range of backgrounds and interests. This report and the reports of the CDEAC task forces represent a comprehensive and balanced look at transmission, energy efficiency and clean energy resources. These documents represent the best thinking of some of the most accomplished experts across an array of issues. The strength of the CDEAC report is the recommendations for consideration by the Governors. We have organized the recommendations into those that can be considered by individual states, those that suggest opportunities for action on a regional level, and those that offer the potential for influencing national policy. As requested by your charge to the CDEAC, the recommendations stress non-mandatory, incentive-based approaches. The CDEAC believes that the suite of recommendations is worthy of consideration and adoption by the Western Governors where appropriate. The CDEAC believes this report offers the Western Governors a host of viable options for increasing

William J. Keese

2006-01-01T23:59:59.000Z

90

Enforcement Action - EA-2005-07  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

your response to the PNOV, including your proposed corrective actions entered into the NTS, DOE will determine whether further enforcement action is necessary to ensure...

91

Proposal Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Deadline: June 30, 2008 Funding LLNL supports projects with funding from University of California. Funding for the IGPP Minigrant projects is limited to 50,000 per...

92

The 3060-Day Convection Seesaw between the Tropical Indian and Western Pacific Oceans  

Science Conference Proceedings (OSTI)

The tropical Indian and western Pacific oceans are two prominent action centers for tropical 3060-day convective variability. When convection is enhanced over the equatorial Indian Ocean, the tropical western Pacific often experiences an ...

Baozhen Zhu; Bin Wang

1993-01-01T23:59:59.000Z

93

Conceptual Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

-1-08 submitted to Energy Engineering -1-08 submitted to Energy Engineering Action-Oriented Benchmarking: Using the CEUS Database to Benchmark Commercial Buildings in California Paul Mathew & Evan Mills, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT The 2006 Commercial End Use Survey (CEUS) database developed by the California Energy Commission is a far richer source of energy end-use data for non-residential buildings than has previously been available and opens the possibility of creating new and more powerful energy benchmarking processes and tools. In this article - Part 2 of a two-part series - we describe the methodology and selected results from an action-oriented benchmarking approach using the new

94

Unsolicited Proposals  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy's (DOEs) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas.

95

Record of Decision and Floodplain Statement of Findings: Western Greenbrier Co-Production Demonstration Project, Rainelle, Greenbrier County, WV (DOE/EIS-0361) (04/29/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14 Federal Register 14 Federal Register / Vol. 73, No. 83 / Tuesday, April 29, 2008 / Notices DEPARTMENT OF ENERGY Record of Decision and Floodplain Statement of Findings: Western Greenbrier Co-Production Demonstration Project, Rainelle, Greenbrier County, WV AGENCY: Office of Fossil Energy, U.S. Department of Energy (DOE). ACTION: Record of Decision (ROD) and Floodplain Statement of Findings. SUMMARY: DOE has decided to implement the Proposed Action alternative, identified as the preferred alternative, in the Western Greenbrier Co-Production Demonstration Project, Final Environmental Impact Statement (DOE/EIS-0361; November 2007) (FEIS). That alternative is to provide approximately $107.5 million (up to 50% of the development costs) to Western Greenbrier Co-Generation, LLC

96

Phase I Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada with Errata Sheet 1, 2, 3, Revision 1  

Science Conference Proceedings (OSTI)

As prescribed in the Pahute Mesa Corrective Action Investigation Plan (CAIP) (DOE/NV, 1999) and Appendix VI of the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended February 2008), the ultimate goal of transport analysis is to develop stochastic predictions of a contaminant boundary at a specified level of uncertainty. However, because of the significant uncertainty of the model results, the primary goal of this report was modified through mutual agreement between the DOE and the State of Nevada to assess the primary model components that contribute to this uncertainty and to postpone defining the contaminant boundary until additional model refinement is completed. Therefore, the role of this analysis has been to understand the behavior of radionuclide migration in the Pahute Mesa (PM) Corrective Action Unit (CAU) model and to define, both qualitatively and quantitatively, the sensitivity of such behavior to (flow) model conceptualization and (flow and transport) parameterization.

Greg Ruskauff

2009-02-01T23:59:59.000Z

97

EIS-0471: Department of Energy Loan Guarantee to Support Proposed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County,...

98

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...

99

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21813 21813 Vol. 76, No. 75 Tuesday, April 19, 2011 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket Number: EERE-2010-BT-CE-0014] RIN 1904-AC23 Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Proposed rule. SUMMARY: The U.S. Department of Energy (DOE or the ''Department'') proposes to amend the compliance dates for revisions to its certification, compliance, and enforcement regulations for certain commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the ''Act''). Specifically, DOE is tentatively proposing an 18-month extension to the

100

Standards Actions, May 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-2001 30-2001 Activity Summary In Conversion - 4 In Preparation - 39 Out for Comment - 19 Published this Month - 0 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 23 Cancellation Pending - 9 Cancellation in Progress - 18 No Current Action - 12 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Proposed for Reaffirmation 1 Proposed Cancellation of DOE Technical Standards 2 Published DOE Technical Standards 3 American National Standards Institute 3 American National Standards 6 American Society for Testing and Materials 6 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. May 2001 Standards Actions DOE Technical Standards Projects Initiated

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Western Area Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

served by Western would provide long term economic benefits by increasing the percentage of energy provided by renewable sources. Require New Capacity Be Used Exclusively...

102

Western Business Rountable: Coordination of Federal Authorizations for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Business Rountable: Coordination of Federal Authorizations Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities The Western Business Roundtable ("Roundtable") respectfully submits the following comments relating to the U.S. Department of Energy's (DOE) request for public comments regarding implementation of its transmission siting obligations under Section 216(h) of the Federal Power Act. Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities More Documents & Publications Comments Received on Proposed Rulemaking for regulation implementing section 216(h): Coordination of Federal Transmission Permitting on Federal

103

Standards Actions, May 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-29-2002 4-29-2002 Activity Summary In Conversion - 4 In Preparation - 47 Out for Comment - 12 Published this Month - 6 5-year Review Status Revision in Progress - 10 Reaffirmation in Progress - 12 Supersedure in Progress - 0 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 20 Inside this issue: DOE Technical Standards Proposed for Reaffirmation 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- May 2002 Standards Actions DOE Technical Standards Proposed for Reaffirmation The following documents are currently being reevaluated under the 5-year

104

Action Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

105

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

106

Western Area Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

v*Zy- i , . v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ Western Area Power Administration Follow-up to Nov. 25, 2008 Transition Meeting Undeveloped Transmission Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line to relieve congestion in the Sacramento area. In addition, Western has rights-of- way for many transmission lines that could be rebuilt to increase transmission capacity. For example, Western's Tracy-Livermore 230-kV line is a single circuit line but the existing towers could support a double circuit line. These rights-of-way would have to

107

Proposed Rules DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 76, No. 1 / Monday, January 3, 2011 / Proposed Rules DEPARTMENT OF ENERGY [Docket ID: DOE-HQ-2010-0002] 10 CFR Part 1021 RIN 1990-AA34 National Environmental Policy Act Implementing Procedures AGENCY: Office of the General Counsel, U.S. Department of Energy. ACTION: Notice of proposed rulemaking and public hearing. SUMMARY: The U.S. Department of Energy (DOE or the Department) proposes to amend its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The majority of the changes are proposed for the categorical exclusions provisions contained in its NEPA Implementing Procedures, with a small number of related changes proposed for other provisions. These proposed changes are intended to better align the

108

Tropical Convection and Precipitation Regimes in the Western United States  

Science Conference Proceedings (OSTI)

The authors have documented the relationship between tropical convection and precipitation regimes in the western United States. Circulation patterns associated with precipitation regimes are described and physical mechanisms are proposed. ...

Kingtse C. Mo; R. W. Higgins

1998-09-01T23:59:59.000Z

109

Mitigation Action Plan  

Science Conference Proceedings (OSTI)

This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

Not Available

1994-02-01T23:59:59.000Z

110

Western Area Power Administration. Combined power system financial statements  

Science Conference Proceedings (OSTI)

This report presents the results of the independent certified public accountants` audit of the Western Area Power Administration`s combined power system statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Westerns internal control structure disclosed three new reportable conditions concerning the lack of: (1) a reconciliation of stores inventory from subsidiary ledgers to summary financial information, (2) communication of interest during construction and related adjustments to interest on Federal investment, and (3) a system to prevent and detect power billing errors. None of the conditions were considered to be material weaknesses. Western provided concurrence and corrective action plans. The auditors` report on Western`s compliance with laws and regulations also disclosed two new instances of noncompliance. Western failed to calculate nonreimbursable expenses in accordance with the Grand Canyon Protection Act and had an unexplained difference in gross Federal investment balances used to calculate interest on Federal investment. Western provided concurrence and corrective action plans for the instances.

NONE

1998-02-26T23:59:59.000Z

111

February 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards Program Document Status 1-18-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 10 Published in January - 3 5-year Review Status Proposed for Revision-6 Revision in Progress-4 Proposed for Reaffirmation-3 Reaffirmation in Progress-21 Cancellation Pending-16 Cancellation in Progress-0 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/ February 2005 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://tis.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

112

July 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards Program Document Status 06-28-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 14 Published in June - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ July 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

113

May 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-25-2008 4-25-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in April - 2 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ May 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

114

April 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-27-2008 3-27-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in March - 0 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ April 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

115

July 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2007 6-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed forReaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/ July 2007 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

116

October 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publication Staff Roster 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-26-2006 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 16 Published in September - 1 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ October 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access

117

November 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-25-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 16 Published in September - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6

118

April 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 1 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 3-28-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 11 Published in March - 0 5-year Review Status Proposed for Revision-6 Revisions in Progress-4 Proposed for Reaffirmation-3 Reaffirmations in Progress-24 Cancellations Pending-11 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards

119

August 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 16 Published in July - 2 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0

120

August 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 07-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

October 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-27-2007 Activity Summary In Conversion - 4 In Preparation - 26 Out for Comment - 27 Published in September - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

122

SPPR Group Proposal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Expansion in the West DOE Tribal Leader Energy Forum: Transmission and Clean Energy Development in the West February 7 - 8, 2012 Sheraton Hotel, Denver, Colorado Tim Meeks Western Area Power Administration Presentation Overview Overview of Western Area Power Admin. Western as a neighbor Common challenges Initiatives - what we're working on Current Projects On the Horizon Overview of Western 3 One of Four Dept. of Energy PMAs 4 Markets 10,479 MW from 57 Federal Hydropower Projects owned by BOR , Corps, and IB&WC to preference power entities 17,100 miles of high-voltage transmission line across 15-states About 100 tribal customers who receive around 1.2 million megawatt hours per year Tribes make up 10% of Western's core power customers

123

Emergencies and Emergency Actions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergencies and Emergency Actions Emergencies and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. September 8, 2005 Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina;

124

Western Solargenics | Open Energy Information  

Open Energy Info (EERE)

to: navigation, search Name Western Solargenics Place Coquitlam, British Columbia, Canada Zip V3J 2L7 Sector Solar, Wind energy Product Subsidiary firm of Western Wind, to...

125

Western Veg Management EA  

NLE Websites -- All DOE Office Websites (Extended Search)

the the Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest DOE/EA-1863 July 2012 Lead Agency: United States Department of Energy, Western Area Power Administration Cooperating Agency: United States Forest Service Coconino National Forest FINAL ENVIRONMENTAL ASSESSMENT DOE/EA-1863 Glen Canyon - Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project Coconino and Yavapai Counties, Arizona U.S. Department of Energy Western Area Power Administration Desert Southwest Customer Service Region 615 South 43rd Avenue Phoenix, Arizona 85009 U.S. Department of Agriculture US Forest Service Coconino National Forest 1824 S. Thompson St. Flagstaff, AZ 86001 July 2012

126

Tropical Western Pacific  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM-00-005 ARM-00-005 RPT(TWP)-010.006 LA-UR-004434 Tropical Western Pacific Site Science Mission Plan July - December 2000 Prepared for the U.S. Department of Energy under Contract W-7405-ENG-36 Tropical Western Pacific Project Office Atmospheric and Climate Sciences Group (EES-8) Earth and Environmental Sciences Division Los Alamos National Laboratory Los Alamos, NM 87545 This report and previous versions are available electronically at the following web sites: http://www.arm.gov/docs/sites/twp/science_plan/archive.html http://www.twppo.lanl.gov/docs/office.html 2 DISCLAIMER This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor an agency thereof, nor any of their employees, makes any warranty, expresses or

127

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

128

WESTERN UNIVERSITY Disaster Plan  

E-Print Network (OSTI)

.7 Assumptions 1.7.1 Emergency 1.7.2 Disaster 1.8 Concept of Operations 1.8.1 Background 1.8.2 Emergency Response/Administrative Unit Responsibilities 1.8.8 Situation Reports 2. UTILIZING THE DISASTER PLAN 2.1 Emergency Process Members ­ Individual Responsibilities #12;WESTERN UNIVERSITY Disaster Plan January, 2013 2.7.1 VP

Sinnamon, Gordon J.

129

Secretary Bodman Promotes Energy Bill to Western Governors | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Promotes Energy Bill to Western Governors Promotes Energy Bill to Western Governors Secretary Bodman Promotes Energy Bill to Western Governors March 1, 2005 - 10:37am Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman in a speech before the Western Governors Association today expressed the need for Congress to pass comprehensive energy legislation and highlighted the benefits of the proposal for the western United States. Secretary Bodman also discussed a number of important energy initiatives including: nuclear defense; scientific research; oil and gas exploration in Alaska; hydropower; the strengthening of our power grid; further development of renewable energy; hydrogen powered fuel-cell vehicles; and clean-coal power generation. "The energy challenges facing our country today are greater than they have

130

August 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-31-2001 7-31-2001 Activity Summary In Conversion-4 In Preparation-43 Out for Comment-17 Published this Month-0 5-year Review Status Revision in Progress-6 Reaffirmation in Progress-23 Cancellation Pending-4 Cancellation in Progress-12 Proposed for Cancellation-13 No Current Action-11 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standard Recently Reaffirmed 1 DOE Technical Standards Recently Published 2 American National Standards Institute 2 American National Standards 4 American Society for Testing and Materials 5 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- August 2001 Standards

131

SPPR Group Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Western's pursuit of a TIP-financed project to enhance the Parker-Davis Project transmission system South of Phoenix October 6, 2010, Customer Meeting Recap October 6 th...

132

Western Veg Management EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for the Environmental Assessment for the Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest November 2011 Glen Canyon-Pinnacle Peak 345 kV Transmission Lines EPG Vegetation Management Project Draft EA i November 2011 TABLE OF CONTENTS 1 Section 1 - Purpose and Need for Action .................................................................................... 1-1 2 1.1 Introduction and Background ........................................................................... 1-1 3 1.2 Purpose and Need for Action ............................................................................ 1-3 4 1.3 Location and project Area Description ............................................................. 1-3 5

133

Corrective Action Management Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Corrective Action Management Program (CAMP) Home CAMP Background DOE Directives Corrective Action Management Team Corrective Action Tracking System (CATS) CAMP Quarterly Reports...

134

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60-DAY Federal Register Notice - Proposed 60-DAY Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the

135

July 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 06-28-2005 Activity Summary In Conversion - 4 In Preparation - 21 Out for Comment - 10 Published in June - 2 5-year Review Status Proposed for Revision-6 Revision in Progress-3

136

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Mitigation Action Plan : Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

137

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28: Mitigation Action Plan 28: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

138

RCRA corrective action determination of no further action  

SciTech Connect

On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.

NONE

1996-06-01T23:59:59.000Z

139

Corrective Actions Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Stewardship Environmental Cleanup Corrective Actions Corrective Actions Process The general process for evaluating and remediating potential release sites is called...

140

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Survey Form Changes 2013 Proposals The U.S. Energy Information Administration (EIA) is proposing to change its data protection policy for the following survey forms: Form...

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

SSRL Call for Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Crystallography proposals are due April 1 and July 1 Due to the installation and commissioning of SPEAR3 (April 2003-January 2004), the schedule for proposal submissions has...

142

Western Area Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Western Area Power Administration Customer Meeting The meeting will begin at 12:30 pm MST We have logged on early for connectivity purposes Please stand-by until the meeting begins Please be sure to call into the conference bridge at: 888-989-6414 Conf. Code 60223 If you have connectivity issues, please contact: 866-900-1011 1 Introduction  Welcome  Introductions  Purpose of Meeting ◦ Status of the SLCA/IP Rate ◦ SLCA/IP Marketing Plan ◦ Credit Worthiness Policy ◦ LTEMP EIS update ◦ Access to Capital  Handout Materials http://www.wapa.gov/crsp/ratescrsp/default.htm 2 SLCA/IP Rate 3 1. Status of Repayment 2. Current SLCA/IP Firm Power Rate (SLIP-F9) 3. Revenue Requirements Comparison Table 4.SLCA/IP Rate 5. Next Steps

143

SPPR Group Proposal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Doe Office of Indian Energy Tribal Doe Office of Indian Energy Tribal Leader Forum Leveraging Renewable Resources to Support Military Energy May 30 - 31, 2013 Phoenix, AZ Penny Casey Western Area Power Administration Presentation Overview  Power Marketing Administrations  Overview of Western Area Power Administration  Renewable Resources for Federal Agencies Program  Assisting Tribes with Renewable Energy Development 2 Power Marketing Administrations  Federal agencies formed under the Department of Energy Organization Act (1977) responsible for marketing hydropower primarily from multi-use water projects operated by the Bureau of Reclamation, the Army Corps of Engineers, and the International Boundary & Water Commission  4 Distinct PMAs under the Department of Energy

144

EMSL: Proposal Extensions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Summary/Extension for Fiscal Year 2014 Proposal Summary/Extension for Fiscal Year 2014 Published December 2013. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo Summaries of the work performed with EMSL resources are required for all user projects (see details below) and should be submitted through the User Portal. For projects open for one year or less, these summaries are due when the proposal closes. For projects that are submitted in response to a Call for Proposals and are eligible for yearly extensions, summaries are

145

Western LNG project - Project summary  

Science Conference Proceedings (OSTI)

The Western LNG Project is a major new undertaking involving the liquefaction of conventional natural gas from the Western Canadian Sedimentary Basin at a plant on the British Columbia north coast. The gas in its liquid form will be shipped to Japan for consumption by utility companies. The Project represents a new era in gas processing and marketing for the Canadian natural gas industry.

Forgues, E.L.

1984-02-01T23:59:59.000Z

146

Proposed 230-kV Crossover Substation, Big Horn County, Montana: Environmental assessment  

SciTech Connect

Western proposes to construct, operate, and maintain a 230-kV substation northwest of Hardin, Big Horn County, Montana. The proposed Crossover Substation would form an interconnection between Western's Yellowtail-Custer and MPC's Colstrip-Billings 230-kV transmission lines. Impacts and mitigation strategies are discussed.

1984-02-01T23:59:59.000Z

147

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

128: Mitigation Action Plan 128: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos-Gates (Path 15) Transmission Project This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Elect, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE/EIS-0128, Western Area Power Administration, Mitigation Action Plan for the Los Banos-Gates (Path 15) Transmission Project (January 2003) More Documents & Publications EIS-0128: Mitigation Action Plan FAQS Gap Analysis Qualification Card - Mechanical Systems

148

Western Area Power Administration Record of Decision for the Energy Planning and Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 81 Federal Register / Vol. 60, No. 197 / Thursday, October 12, 1995 / Notices at 941 North Capitol Street, NE., Washington, DC 20426. Lois D. Cashell, Secretary. [FR Doc. 95-25230 Filed 10-11-95; 8:45 am] BILLING CODE 6717-01-M Western Area Power Administration Record of Decision for the Energy Planning and Management Program AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Department of Energy, Western Area Power Administration (Western) completed a draft and final environmental impact statement (EIS), DOE/EIS-0182, on its Energy Planning and Management Program (Program). Western is publishing this Record of Decision (ROD) to adopt the Program, which will require the preparation of integrated resource plans (IRP) by Western's long-term firm power

149

EMSL: Proposal Guidance:  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

150

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

151

The Western Edge: some recent electronic music from Western Australia  

Science Conference Proceedings (OSTI)

A survey is presented of developments in recent Western Australian electronic music, focusing on the geographical influence on local composers' work. The article follows specific cases of practitioners in the fields of Sound Art (Alan Lamb and Hannah ...

Lindsay Vickery

2001-04-01T23:59:59.000Z

152

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of

153

Russia pins energy hopes on western Siberia gas  

Science Conference Proceedings (OSTI)

This paper reports that natural gas, not oil or coal, will pull Russia out of its fuel production slump by the end of the century, predicts a recently disclosed study by Moscow's leading energy specialists. Western investment in Russia's natural gas industry is now being proposed on a scale rivaling foreign outlays for joint ventures aimed at stabilizing the republic's oil production.

Not Available

1992-09-07T23:59:59.000Z

154

General User Proposal Scores  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposal Scores General User Proposal Scores General User Proposal Scores Print Tuesday, 01 June 2010 10:34 Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beamtime requests exceed available beamtime, a cutoff score is assigned after which no beam time is allocated. proposal scores Beam Time Cutoff Scores for the Current Cycle The table below lists the percent of beam time shifts allocated/requested for each beamline, and the cutoff scores, below which no beam time was assigned.

155

Looking at Western Nepal's Climate  

Science Conference Proceedings (OSTI)

Working in western Nepal as a climatologist, one encounters conditions and problems very different from those in technologically advanced countries. This article discusses the working environment, the present state of climatology, some recent ...

Norman Thyer

1985-06-01T23:59:59.000Z

156

Topic A" Awardee: Western Electricity Coordinating Council |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A" Awardee: Western Electricity Coordinating Council Topic A" Awardee: Western Electricity Coordinating Council Regional Transmission Expansion Planning (RTEP) The America Recovery...

157

Western Electricity Coordinating Council (WECC) Webinar  

Energy.gov (U.S. Department of Energy (DOE))

Hosted by the Western Electricity Coordinating Council (WECC), the regional entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection, this...

158

Proposed Rules Federal Register  

NLE Websites -- All DOE Office Websites (Extended Search)

information that it is making available about the liquid-immersed distribution transformer equipment classes that were analyzed in a previously issued notice of proposed...

159

SPPR Group Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Proposal June 23, 2010 Agenda Purpose of Meeting Presenters Background Information  Three Terminal Plan & Market Access  Business Case  Transmission Infrastructure Program ED5-Palo Verde Project Potential Rate Impacts Discussion / Comments 2 Purpose of Meeting Provide background information Share the SPPR Group's current proposal and how it might affect Parker-Davis Project (P-DP) customers Obtain your feedback on the proposal 3 Presenters Background Information - Todd Rhoades ED5-PV Project Description - Todd Rhoades Project Marketability - John Steward Project Cost & Financing - Jack Murray Potential Rate Impacts - Jack Murray Next Steps - Todd Rhoades 4 Three Terminal Plan November 2009 5 Business Case

160

2014 Coal Form Proposals  

U.S. Energy Information Administration (EIA)

Coal Survey Form Changes Proposed for 2014. The U.S. Energy Information Administration (EIA) has begun the process of re-clearing the coal survey ...

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ARM - AAF Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns...

162

Energy and water in the Western and Texas interconnects.  

Science Conference Proceedings (OSTI)

The Department of Energy's Office of Electricity has initiated a $60M program to assist the electric industry in interconnection-level analysis and planning. The objective of this effort is to facilitate the development or strengthening of capabilities in each of the three interconnections serving the lower 48 states of the United States, to prepare analyses of transmission requirements under a broad range of alternative futures and develop long-term interconnection-wide transmission expansion plans. The interconnections are the Western Interconnection, the Eastern Interconnection, and the Texas Interconnection. One element of this program address the support and development of an integrated energy-water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning (the Eastern Interconnection is not participating in this element). Specific objectives include: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between members of this proposal team and the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Electric Reliability Council of Texas (ERCOT) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and ERCOT. The goals of this project are: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between Western Electricity Coordinating Council, Electric Reliability Council of Texas, Western Governors Association, and Western States Water Council. (3) Exercise the Energy-Water DSS to investigate water transmission planning scenarios.

Tidwell, Vincent Carroll

2010-08-01T23:59:59.000Z

163

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

164

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

165

Proposal Review Panel Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Descriptions Proposal Review Panel Descriptions To ensure competent scientific review, a proposal may be assigned to a different panel (at the discretion of the Review Panel Chair), or the panel may seek additional ad hoc reviews from other experts. High-Pressure This panel reviews scattering and diffraction proposals that focus on materials at high pressure. Techniques such as (but not limited to) diffraction, nuclear resonant scattering, and inelastic x-ray scattering for materials at high pressure are appropriate for this panel to consider. Instrumentation This panel reviews proposals related to the development of beamline instrumentation, sample environments, x-ray optical components, and/or detectors that are relevant to synchrotron radiation research. This panel

166

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

167

ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE  

Office of Legacy Management (LM)

ADDENDUM TO ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE PROPOSED INTERIM REMEDIAL ACTIONS FOR FY 1983-85 ACCELERATED PROGRAM (1984 VICINITY PROPERTIES CLEANUP) Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois July 1984 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee CONTENTS Page SUMMARY OF PROPOSED ACTION AND RELATED ACTIVITIES ........... 1 HISTORY AND ENVIRONMENTAL SETTING ........................ 4 RADIOLOGICAL CONTAMINATION AND NEED FOR PROPOSED ACTION ........ 4 Property A .. . . . . . . . . . . . . . . . .. . . . . . . 6 Property C' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Property H ...... ............. ... 7 Property H' . . . . . . . . . . . . . . . . . . .. . . . . . . . . 7 Property L ..... ...... .

168

Proposed Technical Specification Amendment  

E-Print Network (OSTI)

This letter provides the final revised Technical Specification (TS) pages for the subject proposed TS amendment. In Reference 1 Duke Energy requested an amendment to the Catawba Nuclear Station Facility Operating Licenses and Technical Specifications (TS). The proposed amendment revises various TS that are affected by the revised heatup, cooldown, critically, and inservice test pressure and temperature (P/T) limits for the reactor coolant system (RCS) of each unit. The proposed amendment also revised the TS requirements for the low temperature overpressure protection (LTOP) system for each unit. www. duke-energy. corn

D. M. Jamil; Duke Power

2004-01-01T23:59:59.000Z

169

Western Area Power Administration combined power system financial statements, September 30, 1996 and 1995 (with independent auditors` report thereon)  

SciTech Connect

This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statements. The auditors` report on Western`s internal control structure disclosed two new reportable conditions and discussed the status of an unresolved condition from prior years. The new conditions involved the write-off of aging accounts receivable and the understatement of interest expense for inactive construction work orders. These reportable conditions are not considered to be material weaknesses. Western concurred with the audit recommendations and is responsible for necessary corrective actions. The auditors also considered the overview and performance measure data for completeness and material consistency with the basic financial statements as noted in the internal control report. The report also disclosed an additional reportable condition directed to the Bureau of Reclamation (Reclamation) which is not considered to be a material weakness. Reclamation concurred with the audit recommendation and is responsible for necessary corrective action. The auditors` report on Western`s compliance with laws and regulations disclosed two new instances of noncompliance involving interest charges on all construction costs funded with Federal appropriations and other capitalized costs. The report also discussed the status of one instance of noncompliance from prior years. Western provided concurrence and corrective action plans for all of these instances of noncompliance.

1997-04-01T23:59:59.000Z

170

Proposed WSRC Clearance Modifications  

SciTech Connect

Westinghouse Savannah River Company proposes to modify criteria used for releasing material from Savannah River Site radiological areas to other SRS areas and for releasing material from SRS for uncontrolled use.

Crase, K.W.

2002-12-18T23:59:59.000Z

171

The Broadband Status in the Region of Western Greece: Overview and Recommendations  

E-Print Network (OSTI)

This paper presents a study conducted in the Region of Western Greece, in order to propose an overall planning for the development of broadband infrastructure in the Region of Western Greece. The current broadband status in the region is being described, while the results of a survey on broadband usage and demand are being presented. The paper proposes some Recommendations that should be adopted in the region of Western Greece in order for the appropriate broadband infrastructures to be developed and adopted so as to contribute to economic growth and to tackle any possible cases of digital gap between the citizens of our country.

Antonios Alexiou; Christos Bouras; Vaggelis Igglesis; Vaggelis Kapoulas; Michael Paraskevas; Thrasyvoulos Tsiatsos; John Papagiannopoulos

2005-01-01T23:59:59.000Z

172

Western Gas Sands Project. Status report  

SciTech Connect

The progress during December, 1977 of the major government sponsored endeavors undertaken to increase gas production from the low permeability gas sands of the western United States is summarized. The USGS is continuing geological and geophysical studies in the four major western basins to better characterize the resource base. Shipping arrangements for the core donated to the USGS by Inexco WASP (a well drilled for possible nuclear explosive stimulation in Wyoming) have been made, and cores for macrofossil and ostracode analysis from the Bowdoin Dome area have been collected. The National Laboratories, funded by DOE, are continuing their work in the area of research and development. The emphasis is on the development of new tools and instrumentation systems, rock mechanics, mathematical modeling and data analysis. Field tests and demonstrations active in the Uinta and Piceance Basins are Gas Producing Enterprises (GPE) Natural Buttes, Wells No. 14, 18, 19, 20, 21, and 22; Mobil Research and Development, Well No. F-31-13G; and Rio Blanco Natural Gas Company, Well No. 498-4-1. Colorado Interstate Gas Company has initiated activity on its project with the installation of equipment, and Mitchell Energy Company's proposal to conduct an MHF test in the Cotton Valley lime gas reservoir in Texas is nearing the contract negotiation stage.

1978-02-01T23:59:59.000Z

173

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

174

Action Plan for Forest Law Enforcement Governance and Trade (FLEGT) | Open  

Open Energy Info (EERE)

Plan for Forest Law Enforcement Governance and Trade (FLEGT) Plan for Forest Law Enforcement Governance and Trade (FLEGT) Jump to: navigation, search Name Action Plan for Forest Law Enforcement Governance and Trade (FLEGT) Agency/Company /Organization European Union Sector Land Focus Area Forestry Topics Policies/deployment programs Resource Type Lessons learned/best practices Website http://eur-lex.europa.eu/smart Country Belgium, Bulgaria, Czech Republic, Denmark, Germany, Estonia, Ireland, Greece, Spain, France, Italy, Cyprus, Latvia, Lithuania, Luxembourg, Hungary, Malta, Netherlands, Austria, Poland, Portugal, Romania, Slovenia, Slovakia, Slovenia, Finland, Sweden, United Kingdom Western Europe, Eastern Europe, Eastern Europe, Northern Europe, Western Europe, Northern Europe, Northern Europe, Southern Europe, Southern Europe, Western Europe, Southern Europe, Western Asia, Northern Europe, Northern Europe, Western Europe, Eastern Europe, Southern Europe, Western Europe, Western Europe, Eastern Europe, Southern Europe, Eastern Europe, Southern Europe, Eastern Europe, Southern Europe, Northern Europe, Northern Europe, Northern Europe

175

Momentum Dependent Fundamental Action  

E-Print Network (OSTI)

The fundamental action is dependent on momentum. Some consequences are presented for matter waves and scalar quantum field theory.

Karl De Paepe

2005-07-26T23:59:59.000Z

176

About Gender Action  

E-Print Network (OSTI)

Gender Action was established in 2002. It is the only organization dedicated to promoting gender justice and womens rights in all International Financial Institution (IFI) investments such as those of the World Bank. Gender Actions goal is to ensure that women and men equally participate in and benefit from all IFI investments.

unknown authors

2013-01-01T23:59:59.000Z

177

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network (OSTI)

WESTERN WATER ASSESSMENT WHITE PAPER Socioeconomic Impacts and Adaptation Strategies: Assessing://www.socioeconimpacts.org and is described in greater detail in a companion white paper, "Socioeconomic Impacts and Adaptation Strategies: Assessing Research on Drought, Climate Change and Recreation". This white paper discusses literature

Neff, Jason

178

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

Tracker Tracker Jump to: navigation, search Tool Summary Name: Climate Action Tracker Agency/Company /Organization: Ecofys Sector: Climate Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual Website: www.climateactiontracker.org/ Climate Action Tracker Screenshot References: Climate Action Tracker[1] "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The website provides an up-to-date assessment of individual national pledges to reduce their greenhouse gas emissions. In the framework of the UNFCCC, many countries have put proposals on the table about how much they intend to reduce their greenhouse-gas emissions in both the near and the long term.

179

EAC Recommendations for DOE Action Regarding Development of the Next  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of the Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System, approved at the October 15-16, 2012 EAC Meeting. EAC Recommendations for DOE Action on the Development of the Next Generation Grid Operating System - October 17, 2012 More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2012 - Monday, October 15, 2012 Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western

180

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah  

Energy.gov (U.S. Department of Energy (DOE))

This EIS is being prepared jointly by DOEs Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Westerns proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

A Proposed Architecture  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposed Proposed Architecture for the NLC Diagnostic Regions Peter Tenenbaum, for the Diagnostic Region Group LCC-Note-0011 Draft 5-February-1999 1 introduction The NLC Main Linac CD-1 design contains 4 diagnostic regions (injection, extraction, and at the junctions between supersectors); the injector and beam delivery regions contain additional diagnostic regions modelled on those in the main linac, and one additional region may be added to the main linac (at the 330 GeV point, halfway through the third supersector). Each diagnostic region must support a variety of different beam measuring and manipulating tasks. In this Note we propose an overall architecture which permits all of these requirements to be met. 2 Requirements The main linac diagnostic regions must provide the following: * Beam position monitors for use by the conventional fast feedback system, and actuators (DC

182

2014 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for 2014 The U.S. Energy Information Administration (EIA) is proposing changes to its electricity data collection in 2014. These changes involve the following surveys: Form EIA-63B, "Annual Photovoltaic Cell/Module Shipments Report," Form EIA-411, "Coordinated Bulk Power Supply Program Report," Form EIA-826, "Monthly Electric Utility Sales and Revenue Report with State Distributions," Form EIA-860, "Annual Electric Generator Report," Form EIA-860M, "Monthly Update to the Annual Electric Generator Report," Form EIA-861, "Annual Electric Power Industry Report," Form EIA-861S, "Annual Electric Power Industry Report (Short Form)," and

183

Olympic voting system proposal  

Science Conference Proceedings (OSTI)

In an effort to address the contentious issue of judged Olympic events, the Olympic committee has proposed a pilot audience participation system to score the gymnastics and diving competitions in the upcoming 2004 Athens Summer Games. The system would ... Keywords: Olympics usability, audience, design methodology, ergonomics, industrial design, interaction design, interactive, interface, voting

Seamus Costello; Kari Kubala; Matt Turley; Mehmet Uzer

2004-04-01T23:59:59.000Z

184

NSLS Committees | Proposal Oversight Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Oversight Panel Charge Assume responsibility for completing any missing third reviews of the regular Proposal Review Panels. Review proposals with large rating...

185

Proposals for Structural Biology Beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals for Structural Biology Beamlines Proposals for Structural Biology Beamlines Print Tuesday, 01 June 2010 09:52 Submit a New Proposal for Structural Biology Beamlines...

186

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the environmental impacts of interconnecting the proposed 300-megawatt Hermosa West Wind Farm Project, in Albany County, Wyoming, with DOEs Western Area Power Administrations existing Craig-Ault 345-kilovolt transmission line.

187

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18954 18954 Vol. 76, No. 66 Wednesday, April 6, 2011 DEPARTMENT OF ENERGY 5 CFR Chapters XXIII and XXIV 10 CFR Chapters II, III, and X 18 CFR Chapter I 41 CFR Chapter 109 48 CFR Chapter 9 Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information; extension of public comment period. SUMMARY: On February 3, 2011, the Department of Energy (DOE) published a request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review.'' This document announces that the period for submitting reply comments is extended to April 15, 2011. The February 3 document incorrectly published in the Notices section of the Federal Register.

188

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31548 31548 Vol. 77, No. 103 Tuesday, May 29, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of extension of public comment period. SUMMARY: This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' is extended to June 19, 2012. DATES: DOE will accept comments, data, and information regarding the RFI received no later than June 19, 2012. ADDRESSES: Interested persons are encouraged to submit comments, identified by ''Regulatory Burden RFI,'' by any of the following methods:

189

Proposed Rules Federal Register  

NLE Websites -- All DOE Office Websites (Extended Search)

43015 43015 Vol. 77, No. 141 Monday, July 23, 2012 DEPARTMENT OF ENERGY 10 CFR Part 431 [Docket No. EERE-2010-BT-STD-0027] RIN 1904-AC28 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of public meeting and availability of preliminary technical support document. SUMMARY: The U.S. Department of Energy (DOE or Department) will hold a public meeting to discuss and receive comments on the following: the equipment classes DOE plans to analyze for the purpose of amending energy conservation standards for certain commercial and industrial electric motors under section 342(b) of the

190

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75798 75798 Vol. 76, No. 233 Monday, December 5, 2011 DEPARTMENT OF ENERGY 5 CFR Chapter XXIII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. The purpose of DOE's review is to make the agency's regulatory program more effective and less burdensome in achieving its

191

NREL: Transmission Grid Integration - Western Wind Dataset  

NLE Websites -- All DOE Office Websites (Extended Search)

Western Wind Dataset Western Wind Dataset Here you will find information about the Western Wind Dataset, including the methodology used to develop the dataset, the accuracy of the data, site selection, and power output. Alert! Important Note Obtain the Western Wind Dataset This dataset was originally created for the Western Wind and Solar Integration Study. These data are modeled data and not actual measured data. Learn more about the datasets including the similarities and differences between the Eastern and Western datasets and the differences from the NREL state wind maps. Methodology 3TIER created the Western Dataset with oversight and assistance from NREL. Numerical Weather Prediction (NWP) models were used to essentially recreate the historical weather for the western U.S. for 2004, 2005, and 2006. The

192

Western NY Energy LLC | Open Energy Information  

Open Energy Info (EERE)

search Name Western NY Energy LLC Place Mount Morris, New York Zip 14510 Product Bioethanol producer. References Western NY Energy LLC1 LinkedIn Connections CrunchBase...

193

Western Area Power Administration Rocky Mountain Region (RMR)  

NLE Websites -- All DOE Office Websites (Extended Search)

(RMR) (RMR) Meter Application Agreement (Boundary Meter, Revenue Meter, Delivery Point Change, or Usage or Ownership Change) Agreement Number and Effective Date (to be assigned by Western): Requesting Company Name: Street Address: City: State: Zip Code: Meter Type: Boundary Revenue Type of meter work requested (define project scope): Drawing Requirement: Please include a Utility System or Substation Single Line diagram of the proposed meter location. A legible, hand drawn diagram is acceptable.

194

Climate adaptation wedges: a case study of premium wine in the western United States  

SciTech Connect

Design and implementation of effective climate change adaptation activities requires quantitative assessment of the impacts that are likely to occur without adaptation, as well as the fraction of impact that can be avoided through each activity. Here we present a quantitative framework inspired by the greenhouse gas stabilization wedges of Pacala and Socolow. In our proposed framework, the damage avoided by each adaptation activity creates an 'adaptation wedge' relative to the loss that would occur without that adaptation activity. We use premium winegrape suitability in the western United States as an illustrative case study, focusing on the near-term period that covers the years 2000 39. We find that the projected warming over this period results in the loss of suitable winegrape area throughout much of California, including most counties in the high-value North Coast and Central Coast regions. However, in quantifying adaptation wedges for individual high-value counties, we find that a large adaptation wedge can be captured by increasing the severe heat tolerance, including elimination of the 50% loss projected by the end of the 2030 9 period in the North Coast region, and reduction of the projected loss in the Central Coast region from 30% to less than 15%. Increased severe heat tolerance can capture an even larger adaptation wedge in the Pacific Northwest, including conversion of a projected loss of more than 30% in the Columbia Valley region of Washington to a projected gain of more than 150%. We also find that warming projected over the near-term decades has the potential to alter the quality of winegrapes produced in the western US, and we discuss potential actions that could create adaptation wedges given these potential changes in quality. While the present effort represents an initial exploration of one aspect of one industry, the climate adaptation wedge framework could be used to quantitatively evaluate the opportunities and limits of climate adaptation within and across a broad range of natural and human systems.

Diffenbaugh, Noah [Stanford University; White, Michael A [Utah State University (USU); Jones, Gregory V [Southern Oregon University, Ashland, OR; Ashfaq, Moetasim [ORNL

2011-01-01T23:59:59.000Z

195

Guidance Regarding Actions That May Proceed During the National Environmental Policy Act (NEPA) Process: Interim Actions (6/17/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exhibit 3 Exhibit 3 Steps to Follow for Determining Whether Actions May Proceed During the NEPA Process: Interim Actions Would the Interim Action Prejudice the Ultimate Programmatic Decision (i.e., would it tend to determine subsequent development or Limit alternatives)? Is the Proposed Interim Action Within the Scope of a Programmatic or Project-Specific EIS that is Being Prepared? Is the EIS Programmatic in Nature? (If proposed interim action is covered by a CX or EA/FONSI,see footnote 4, page 4, of text) Provisions of 40 CFR 1506.1 Do Not Apply: Follow Normal DOE NEPA Review and Documentation Procedures No Yes No No Would the Interim Action Have An Adverse Impact? Would the Interim Action Limit the Choice of Reasonable Alternatives (e.g., by level of resources

196

Corrective and Preventive Action  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Corrective/Preventive Action Process Document Number: P-008 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): P-004 Business System Management Review, F-017 Corrective Action Report Planning Worksheet or F-018 Preventive Action Report Planning Worksheet P-008 Corrective/Preventive Action Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change A Initial Release 08_0310 Implemented Multiple reviewer of "Root Cause" into process. 08_0313 Changed verbiage in Process, Responsibility and Definitions for clarification. Assigned new Backup Document Owner.

197

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

198

Benefit of Regional Energy Balancing Service on Wind Integration in the Western Interconnection of the United States  

Science Conference Proceedings (OSTI)

Interest in various wide-area balancing schemes to help integrate wind have generated significant interest. As we have shown in past work, large balancing areas not only help with wind integration, but can also increase the efficiency of operations in systems without wind. Recent work on the Western Wind and Solar Integration Study (WWSIS) has found that combining balancing over the WestConnect footprint will increase the efficiency of commitment and dispatch at wind penetrations ranging from 10-20% of annual electricity demand, and will be essential for high penetrations and small balancing areas. In addition the Northwest Wind Integration Action Plan recommended balancing area cooperation as a method to help integrate the large potential wind development. In this paper we investigate the potential impact of a proposed Energy Imbalance Service on the ability of the non-market portions of Western Electricity Coordinating Councils (WECC) United States footprint to integrate wind energy. We will utilize data adapted from the WWSIS for the Western Interconnection. The analysis uses time-synchronized wind and load data to evaluate the potential for ramp requirement reduction that could be achieved with combined operation. Chronological analysis and ramp duration analysis quantify the benefit in terms of not only the ramp sizes, but the frequency of the potentially avoided ramps that must be managed by the non-wind generation fleet. Multiple approaches that can be used to achieve these benefits will also be suggested in the paper. We also suggest other approaches that can help achieve much of the benefit of full consolidation without requiring the physical consolidation of balancing areas.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2010-01-01T23:59:59.000Z

199

Unsolicited Proposals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unsolicited Proposals Unsolicited Proposals Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real Estate Approvals Documents and Publications...

200

May 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

2013 Annual Planning Summary for the Western Area Power Administration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration 2013 Annual Planning Summary for the Western Area Power Administration 2013 Annual Planning Summary for the Western Area Power Administration The...

202

Climate Action Plan (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

203

SEAB Climate Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

204

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley...

205

DEPARTMENT OF ENERGY Western Area Power Administration Provo River Project Rate Order No. WAPA-149  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY Western Area Power Administration Provo River Project Rate Order No. WAPA-149 AGENCY: Western Area Power Administration, DOE. ACTION: Notice of Rate Order Concerning a Power Rate Formula. SUMMARY: The Deputy Secretary of Energy confinned and approved Rate Order No. W AP A-149, placing a power rate fOlIDula for the Provo River Project (PRP) of Western Area Power Administration (Western) into effect on an interim basis. The provisional power rate formula will remain in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) COnfilIDs, approves, and places it into effect on a final basis, or until the power rate formula is replaced by another power rate fOlIDula. DATES: The provisional power rate fonnula will be placed into effect on an interim basis on

206

SSRL- Proposal Review Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Synchrotron Radiation Lab Stanford Synchrotron Radiation Lab search Go [an error occurred while processing this directive] Proposal Review Panel Sub Panels Structural Molecular Biology & Biophysics Materials 1: Structure, Reactivity & Self-Assembly Materials 2: Electronic Properties, Magnetic Properties & Surface Science Molecular Environmental & Interface Science Membership Torgny Gustafsson Rutgers University Dept of Physics & Astronomy 136 Frelinghuysen Rd Piscataway NJ 08854-0849 Victor Henrich Yale University Dept of Applied Physics 327 Becton Center, 15 Prospect St. New Haven CT 06511 Christopher P. Hill University of Utah Biochemistry 15 N. Medical Dr. East, Rm 4100 Salt Lake City, UT 84112-5650 Franz Himpsel University of Wisconsin Dept of Physics 1150 University Avenue

207

Western Renewable Energy Zones Initiative A joint initiative of the Western Governors'Association and U.S.Department  

E-Print Network (OSTI)

#12;Western Renewable Energy Zones Initiative A joint initiative of the Western Governors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 Transmission and Renewable Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 The Path Toward Western Renewable Energy Zones . . . . . . . . . . . . . . . . .5 Renewable

208

Western Cooling Efficiency Center | Open Energy Information  

Open Energy Info (EERE)

Efficiency Center Efficiency Center Jump to: navigation, search Name Western Cooling Efficiency Center Place Davis, CA Website http://http://wcec.ucdavis.edu References Western Cooling Efficiency Center [1] Information About Partnership with NREL Partnership with NREL Yes Partnership Type Test & Evaluation Partner Partnering Center within NREL Electricity Resources & Building Systems Integration LinkedIn Connections Western Cooling Efficiency Center is a research institution located in Davis, CA, at the University of California at Davis (UC Davis). References ↑ "Western Cooling Efficiency Center" Retrieved from "http://en.openei.org/w/index.php?title=Western_Cooling_Efficiency_Center&oldid=382319" Categories: Clean Energy Organizations

209

BS.l Actions to Conserve Energy-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BS.l Actions to Conserve Energy- BS.l Actions to Conserve Energy- Revision 0 Sitewide Categorical Exclusion for Actions to Conserve Energy Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office L11tegrated Management System Procedure, NEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

210

Proposal Team: C. Burger  

NLE Websites -- All DOE Office Websites (Extended Search)

COMPLEX MATERIALS SCATTERING ( ) COMPLEX MATERIALS SCATTERING ( ) Proposal Team: C. Burger 1 , K. Cavicchi 2 , E. DiMasi 3 , A. Fluerasu 3 , S. Fraden 4 , M. Fukuto 3 , O. Gang 3 , B.S. Hsiao 1 , R.J. Kline 5 , S. Kumar 6 , O. Lavrentovich 6 , B. Ocko 3 , R. Pindak 3 , M. Rafailovich 1 , R.A. Register 7 , S. Sprunt 6 , H.H. Strey 1 , B.D. Vogt 8 , W.-L. Wu 5 , L. Wiegart 3 , K.G. Yager 3 1 Stony Brook University, 2 University of Akron, 3 Brookhaven National Lab, 4 Brandeis University, 5 NIST, 6 Kent State University, 7 Princeton University, 8 Arizona State University TECHNIQUES AND CAPABILITIES KEY CONCEPTS SELECTED APPLICATIONS * Small- and wide-angle x-ray scattering on 3PW source, in transmission and reflection mode: USAXS, SAXS, WAXS, GISAXS, GIXRD * High-throughput x-ray scattering for intelligent exploration of vast parameter spaces

211

EIS-0469: Proposed Wilton IV Wind Energy Center Project, Burleigh County,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Proposed Wilton IV Wind Energy Center Project, Burleigh 9: Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota EIS-0469: Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota Summary Western Area Power Administration is evaluating the potential environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to Western's existing Wilton/Baldwin substation and allowing NextEra's existing wind projects in this area to operate above 50 annual MW. Western is preparing a Supplemental Draft EIS to address substantial changes to the proposal, including 30 turbine locations and 5 alternate turbine locations in Crofte Township. Public Comment Opportunities None available at this time. Documents Available for Download

212

Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production DOE/EA-1532 June 2005 National Nuclear Security Administration Sandia Site Office P.O. Box 5400 Albuquerque, New Mexico 87185-5400 Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production i Final EA DOE/EA-1532 June 2005 TABLE OF CONTENTS 1.0 PURPOSE AND NEED FOR AGENCY ACTION ........................................................................ 1 2.0 NO ACTION AND PROPOSED ACTION ALTERNATIVES...................................................... 2 2.1 No Action Alternative....................................................................................... 5

213

Western Riverside Council of Governments - Home Energy Renovation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Riverside Council of Governments - Home Energy Renovation Opportunity (HERO) Financing Program (California) Western Riverside Council of Governments - Home Energy...

214

Canada-Saskatchewan Western Economic Partnership Agreement (Saskatchew...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canada-Saskatchewan Western Economic Partnership Agreement (Saskatchewan, Canada) Canada-Saskatchewan Western Economic Partnership Agreement (Saskatchewan, Canada) Eligibility...

215

EA-1870: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

70: Mitigation Action Plan 70: Mitigation Action Plan EA-1870: Mitigation Action Plan Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The Department of Energy (DOE) issues this Mitigation Action Plan (MAP) in conjunction with its Finding of No Significant Impact as to the department's proposed action of providing costshared funding for the Utah Coal and Biomass Fueled Pilot Plant Project. Based on the analyses in the Environmental Assessment (DOE/EA-1870), DOE determined that its proposed action allowing Viresco Energy, LLC (Viresco) to use federal funding to design, construct and operate a coal and biomass gasification pilot plant (pilot plant) - would not result in any significant environmental impacts. The pilot plant would evaluate the technical feasibility of using steam hydrogasification to convert coal and biomass (such as agricultural

216

EA-1779: Proposed Changes to the Sanitary Biosolids Land Application  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Proposed Changes to the Sanitary Biosolids Land 79: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Summary This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee. Base on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of NEPA, and that preparation of an environmental impact statement is not required.

217

Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84 84 Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia June 2002 U. S. Department of Energy Oak Ridge Operations Oak Ridge, Tennessee DOE/EA-1384 i TABLE OF CONTENTS Executive Summary.....................................................................................................................1 1. INTRODUCTION..................................................................................................................... 6 1.1 PREVIOUS ACTIONS ............................................................................................................................................. 6 1.2 SCOPE OF THIS PROPOSED ACTION..............................................................................................................

218

October 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program

219

Standards Actions, July 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Program Document Status 07-01-2002 Activity Summary In Conversion - 4 In Preparation - 46 Out for Comment - 14 Published this Month - 2 5-year Review Status Revision in Progress - 11 Reaffirmation in Progress - 12 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 19 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Re- cently Sent for Coordination 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- July 2002 Standards Actions DOE Technical Standards Projects Initiated

220

Corrective Action Glossary  

SciTech Connect

The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations or remediations are also included.

Not Available

1992-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Price/Cost Proposal Form  

NLE Websites -- All DOE Office Websites (Extended Search)

PRICECOST PROPOSAL FORM Page No. of NREL Solicitation Document Number: Offeror's Name and Address: Title of Proposed Effort and Task No., Phase No., or Project Total, As...

222

Original Workshop Proposal and Description  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Proposal and Description Visualization Requirements for Computational Science and Engineering Applications Proposal for a DoE Workshop to Be Held at the...

223

Proposals for Structural Biology Beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals for Structural Biology Beamlines Print Submit a New Proposal for Structural Biology Beamlines Available Beamlines The beamlines suitable for structural biology...

224

Proposed solar two project Barstow, California  

DOE Green Energy (OSTI)

This Environmental Assessment (EA) evaluates the environmental consequences of the proposed conversion and operation of the existing Solar One Facility in Daggett, Ca, near the city of Barstow, to a nitrate salt based heat transfer system, Solar Two. The EA also addresses the alternatives of different solar conversion technologies and alternative sites and discusses a no action alternative. A primary objective of the Solar Two Project is to demonstrate the technical and economic feasibility of a solar central receiver power plant using molten salt as the thermal storage and transport fluid medium. If successful, the information gathered from the Solar Two Project could be used to design larger commercial solar power plants.

Not Available

1994-01-01T23:59:59.000Z

225

Case Study - Western Electricity Coordinating Council  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Smart Grid Strategy for Assuring Reliability of the Western Grid A Smart Grid Strategy for Assuring Reliability of the Western Grid The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection. WECC and its members manage the operation and planning of the vast interconnected transmission system connecting generators and loads across almost 1.8 million square miles of territory. The Western Interconnection Synchrophasor Program (WISP), led by WECC and involving 18 partners, is an initiative to modernize operation of the transmission system in the Western Interconnection, increasing reliability and system performance, and enabling greater use of renewable resources such as solar, hydro, and wind.

226

May 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

227

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

228

Climate Action Plan (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

229

Climate Action Plan (Delaware)  

Energy.gov (U.S. Department of Energy (DOE))

The Delaware Climate Change Action Plan (DCCAP) was prepared with funding from the Delaware State Energy Office and the U.S. Environmental Protection Agencys State and Local Climate Change Program...

230

Climate Action Plan (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

On April 20, 2007, Governor Martin OMalley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to...

231

A Proposed Mechanism for the Intrusion of Dry Air into the Tropical Western Pacific Region  

Science Conference Proceedings (OSTI)

Recent studies using data from the Tropical Ocean and Global Atmosphere programs Coupled OceanAtmosphere Response Experiment (TOGA COARE) have shown that synoptic-scale areas of extremely dry air can occur in the troposphere over the equatorial ...

Kunio Yoneyama; David B. Parsons

1999-06-01T23:59:59.000Z

232

Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

233

Western Electricity Coordinating Council | Open Energy Information  

Open Energy Info (EERE)

Council Jump to: navigation, search Name Western Electricity Coordinating Council Place Salt Lake City, UT References SGIC1 No information has been entered for this organization....

234

Western Area Power Administration, Desert Southwest Region  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Western Area Power Administration, Desert Southwest Region Liberty-Parker 2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description...

235

Tropical Western Pacific: A Year in Darwin  

NLE Websites -- All DOE Office Websites (Extended Search)

Richland, Washington L. Jones, W. M. Porch, and A. Haruta Los Alamos National Laboratory Los Alamos, New Mexico Introduction In March 2002, the third Tropical Western...

236

Advanced Manufacturing Office: Western Industrial Energy Efficiency...  

NLE Websites -- All DOE Office Websites (Extended Search)

Send a link to Advanced Manufacturing Office: Western Industrial Energy Efficiency & Combined Heat and Power Regional Dialogue Meeting to someone by E-mail Share Advanced...

237

Sierra Nevada Region - Western Area Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact Us Customers Environmental Review (NEPA) Power Marketing Power Operations The Sierra Nevada Region is one of five offices in the Western Area Power Administration. SN...

238

Western Turbine | Open Energy Information  

Open Energy Info (EERE)

Turbine Turbine Jump to: navigation, search Name Western Turbine Place Aurora, Colorado Zip 80011 Sector Wind energy Product Wind Turbine Installation and Maintainance. Coordinates 39.325162°, -79.54975° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.325162,"lon":-79.54975,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

239

EAC Recommendations for DOE Action on PMAs - June 18, 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EAC Recommendations for DOE Action Regarding the EAC Recommendations for DOE Action Regarding the Power Marketing Administrations June 18, 2012 The Electricity Advisory Committee ("EAC") recommends that the Department of Energy ("DOE") encourage the Western Area Power Administration ("WAPA") and the Southwestern Power Administration ("SWPA") to exercise their authority under Section 1222 of the Energy Policy Act of 2005 ("EPAct"), following consultation with their preference customers and other stakeholders. Pursuant to that provision, WAPA and SWPA can accept funding from third parties for new transmission projects and transmission upgrades, consistent with transmission needs identified by the appropriate transmission organization or approved regional reliability organization.

240

The Teleconnection between the Western Indian and the Western Pacific Oceans  

Science Conference Proceedings (OSTI)

Shown in this study are a teleconnection pattern relating outgoing longwave radiation (OLR) anomalies over the western Pacific Ocean and sea surface temperature anomalies (SSTAs) over the western Indian Ocean over two seasons [SeptemberOctober...

Vasubandhu Misra

2004-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Climate Information for Development Needs: An Action Plan for Africa | Open  

Open Energy Info (EERE)

Climate Information for Development Needs: An Action Plan for Africa Climate Information for Development Needs: An Action Plan for Africa Jump to: navigation, search Tool Summary Name: Climate Information for Development Needs: An Action Plan for Africa Agency/Company /Organization: World Meteorological Organization, United Nations Economic Commission for Africa Focus Area: Agriculture Topics: Co-benefits assessment, Pathways analysis Resource Type: Guide/manual Website: www.wmo.int/pages/prog/gcos/Publications/gcos-108.pdf UN Region: "Sub-Saharan Africa" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

242

First, puzzlement; then action  

Science Conference Proceedings (OSTI)

The faces tell the story. It is May 1992, and these young women from Muslyumovo, a village in the southern Urals of Central Russia, have come to the banks of the Techa river, where they now watch - with puzzlement, skepticism, and a hint of fear - as a small group of Westerners take radiation readings, chiefly gamma radiation from cesium 137. Radiation levels were 30-60 times higher than background radiation because of the proximity of the nearby plutonium-making facility.

Moore, M.

1993-03-01T23:59:59.000Z

243

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

244

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiates Enforcement Actions Against 4 Showerhead Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) March 7, 2010 - 3:41pm Addthis The Office of General Counsel has issued a Notice of Proposed Civil Penalty to Hudson-Reed Limited for failing to certify to DOE that showerheads manufactured or distributed within the United States meet the applicable water conservation standards as required by the Energy Policy and Conservation Act (EPCA) and DOE regulations. This Notice of Proposed Civil Penalty proposes payments to the government of $1,920,200. Under federal law, manufacturers of some products covered by EPCA are required to

245

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

246

EA-1592: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1592: Mitigation Action Plan Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant Based on the analysis in the Environmental Assessment prepared for the proposal by the GSA and NNSA, neither the construction nor operation of the selected alternative wouldhave significant environmental impact. This MAP contains mitigation and monitoring commitments for the project, including commitments set in permits for the new facility. Mitigation Action Plan for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant More Documents & Publications EA-1592: Finding of No Significant Impact

247

Action-Oriented Benchmarking:  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb-2008 submitted to Energy Engineering Feb-2008 submitted to Energy Engineering Action-Oriented Benchmarking: Concepts and Tools Evan Mills, Paul Mathew & Mary Ann Piette, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article-Part 1 of a two-part series-we describe an "action-oriented benchmarking" approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful

248

May 2010 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

249

May 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2009 May 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

250

February 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 2009 February 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

251

Standards Actions - April 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-28-2002 3-28-2002 Activity Summary In Conversion - 4 In Preparation - 44 Out for Comment - 13 Published this Month - 2 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Canceled 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standards Re- cently Published 2 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- April 2002 Standards Actions DOE Technical Standards Project Canceled

252

July 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

253

The art of proposal writing  

Science Conference Proceedings (OSTI)

This class covers general proposal writing for academic projects in two broad categories: research and education. It reviews the project concept, the search for an appropriate funding program, and development of a proposal based on a program announcement. ...

Barb Helfer; Steve Cunningham; Mike McGrath; Larry Rosenblum

2008-08-01T23:59:59.000Z

254

Meeting and Short Course Proposal  

Science Conference Proceedings (OSTI)

Share your knowledge and propose an AOCS Meeting or Short Course. Meeting and Short Course Proposal Meetings, Conferences and Short Courses aocs AOCS Annual Meeting & Expo Call for Papers Conferences Congress control dispersions edible exhibit exp

255

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY  

E-Print Network (OSTI)

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY ANALYSES FOR THE 2007 INTEGRATED ENERGY POLICY REPORT Jim Page, Malachi Weng-Gutierrez, and Gordon Schremp Fossil Fuels Office Fuels and Transportation....................................................................................................... 3 SUMMARY OF PROPOSED TRANSPORTATION ENERGY ANALYSES ............... 4 Background

256

Is the Proposed Google Book Settlement "Fair"? Pamela Samuelson*  

E-Print Network (OSTI)

1 Is the Proposed Google Book Settlement "Fair"? Pamela Samuelson* Introduction Class action.1 The class at issue in the Authors Guild v. Google case now consists of all owners of copyrights settlement of the Authors Guild v. Google lawsuit.3 A ruling on this settlement is expected in the late

Sadoulet, Elisabeth

257

May 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Revisions 1 DOE Technical Standards Projects Initiated 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 04-27-2005 Activity Summary In Conversion - 4 In Preparation - 25

258

EA-1628: Construction and Operation of a Proposed Lignocellulosic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

628: Construction and Operation of a Proposed Lignocellulosic 628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa EA-1628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa SUMMARY This EA evaluated the potential environmental impacts of a DOE proposal to provide financial assistance (the Proposed Action) to POET Project LIBERTY, LLC (POET) for the construction and operation of the lignocellulosic ethanol production facility (Project LIBERTY) near the City of Emmetsburg, Iowa. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 29, 2008 EA-1628: Finding of No Significant Impact Construction and Operation of a Proposed Lignocellulosic Biorefinery, POET Project LIBERTY, LLC, Emmetsburg, Iowa September 29, 2008

259

Preparation for upgrading western subbituminous coal  

SciTech Connect

The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

1990-11-01T23:59:59.000Z

260

ARM - Propose a Field Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsPropose a Campaign govCampaignsPropose a Campaign Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Propose a Campaign : Preproposal Form Preproposals are short summaries of the proposed campaign and can originate with any scientist. Before you begin your preproposal, you should review the guidelines for submitting proposals. If you are preparing your preproposals locally on your computer, please

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Heat Flow From Four New Research Drill Holes In The Western Cascades,  

Open Energy Info (EERE)

From Four New Research Drill Holes In The Western Cascades, From Four New Research Drill Holes In The Western Cascades, Oregon, Usa Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Heat Flow From Four New Research Drill Holes In The Western Cascades, Oregon, Usa Details Activities (1) Areas (1) Regions (0) Abstract: Conceptual models of the thermal structure of the Oregon Cascade Range propose either (1) a narrow zone of magmatic heat sources, flanked by shallow heat-flow anomalies caused by lateral ground-water flow; or (2) a wide zone of magmatic heat sources, with localized, generally negligible ground-water effects. The proposed narrow heat source coincides with the Quaternary volcanic arc, whereas the wider heat source would extend 10-30 km west of the arc. To test the models, four new heat-flow holes were sited

262

Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project (DOE/EIS-0128) (12/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Date: December 3, 2003 1 2 Date: December 3, 2003 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a power marketing administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi-use water projects in the western United States, including California. The Path 15 Project, located in California's western

263

PROPOSAL  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydraulic Motion & Fluid Movement Hydraulic Motion & Fluid Movement RIO Technical Services Page 1 Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 2: Hydraulic Motion & Fluid Movement Through Small Diameter Pipes and Wellbores December 12, 2003 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 NPTO Hydraulic Motion & Fluid Movement RIO Technical Services Page 2 TABLE OF CONTENTS Section 1.0 .............................................................................Introduction Section 2.0........................................................................Results& Findings 2.1..........Significant Parameters Affecting Efficient Cuttings Transport

264

PROPOSAL  

NLE Websites -- All DOE Office Websites (Extended Search)

Downhole Motors Downhole Motors Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 1: Current Capabilities of Hydraulic Motors, Air/Nitrogen Motors, and Electric Downhole Motors January 30, 2004 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 RIO Technical Services Page 1 NPTO Downhole Motors TABLE OF CONTENTS Section 1.0................................................................................Introduction Section 2.0.................Brief History of Coil Tubing and Summary of Downhole Motors Section 3.0.....................................................................Results and Findings 3.1............Motors

265

California's Climate Change Proposed Scoping Plan | Open Energy Information  

Open Energy Info (EERE)

Climate Change Proposed Scoping Plan Climate Change Proposed Scoping Plan Jump to: navigation, search Name California's Climate Change Proposed Scoping Plan Agency/Company /Organization State of California Resource Type Publications, Lessons learned/best practices Website http://www.arb.ca.gov/cc/scopi Country United States Northern America References California's Climate Change Scoping Plan[1] Background "The Assembly Bill 32 Scoping Plan contains the main strategies California will use to reduce the greenhouse gases (GHG) that cause climate change. The scoping plan has a range of GHG reduction actions which include direct regulations, alternative compliance mechanisms, monetary and non-monetary incentives, voluntary actions, market-based mechanisms such as a cap-and-trade system, and an AB 32 program implementation regulation to

266

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

267

February 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Technical Standards Program Document Status Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ Activity Summary In Conversion - 4 In Preparation - 35 Out for Comment - 18 Published this Month - 1 FY 2001 5-year Reviews Revisions in Progress - 2 Reaffirmations in Progress - 2 Supersedures in Progress - 6 Cancellations Pending - 11 Cancellations in Progress - 33 No Current Action - 16 DOE Technical Standards Project Canceled If you have any questions about this action, please contact the person listed be- low. The following DOE Technical Standards project was recently canceled: * EM Facility Hazard Categorization, Project Number SAFT-0029; EM Technical Standards Manager, John Serocki, 301-903-7999, John.Serocki@em.doe.gov, or Tom Wright, 301-903-3661, Tom.Wright@em.doe.gov. The need for this

268

Standards Actions, July 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2001 6-27-2001 Activity Summary In Conversion - 4 In Preparation - 42 Out for Comment - 15 Published this Month - 1 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standard Recently Published 1 American National Standards Institute 2 American National Standards 3 American Society for Testing and Materials 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. July 2001 Standards Actions DOE Technical Standards Projects Initiated

269

Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

270

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upper Great Plains Region Upper Great Plains Region Categorical Exclusion Determinations: Western Area Power Administration-Upper Great Plains Region Categorical Exclusion Determinations issued by Western Area Power Administration-Upper Great Plains Region. DOCUMENTS AVAILABLE FOR DOWNLOAD March 22, 2013 CX-010553: Categorical Exclusion Determination Appledorn Substation Construction CX(s) Applied: B4.11 Date: 03/22/2010 Location(s): Minnesota Offices(s): Western Area Power Administration-Upper Great Plains Region December 3, 2012 CX-009534: Categorical Exclusion Determination Construct New Transmission Line and Footings, Garrison Switchyard CX(s) Applied: B4.13 Date: 12/03/2012 Location(s): North Dakota Offices(s): Western Area Power Administration-Upper Great Plains Region October 11, 2011

271

DECLINING MOUNTAIN SNOWPACK IN WESTERN NORTH AMERICA*  

Science Conference Proceedings (OSTI)

In western North America, snow provides crucial storage of winter precipitation, effectively transferring water from the relatively wet winter season to the typically dry summers. Manual and telemetered measurements of spring snow-pack, ...

Philip W. Mote; Alan F. Hamlet; Martyn P. Clark; Dennis P. Lettenmaier

2005-01-01T23:59:59.000Z

272

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Desert Southwest Region Desert Southwest Region Categorical Exclusion Determinations: Western Area Power Administration-Desert Southwest Region Categorical Exclusion Determinations issued by Western Area Power Administration-Desert Southwest Region. DOCUMENTS AVAILABLE FOR DOWNLOAD August 22, 2013 CX-010882: Categorical Exclusion Determination Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region August 12, 2013 CX-010883: Categorical Exclusion Determination PHX-LOB and LIB-LOB 230-Kilovolt Double-Circuit- Replace Insulators at Structure No. 28-2 With NCI Type Polymers CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

273

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sierra Nevada Region Sierra Nevada Region Categorical Exclusion Determinations: Western Area Power Administration-Sierra Nevada Region Categorical Exclusion Determinations issued by Western Area Power Administration-Sierra Nevada Region. DOCUMENTS AVAILABLE FOR DOWNLOAD July 3, 2013 CX-010684: Categorical Exclusion Determination Cottonwood-Roseville Optical Groundwire Project CX(s) Applied: B4.6, B4.7, B4.11, B4.13 Date: 07/03/2013 Location(s): California Offices(s): Western Area Power Administration-Sierra Nevada Region September 15, 2011 CX-006896: Categorical Exclusion Determination Maxwell - O'Banion Optical Ground Wire CX(s) Applied: B1.7, B4.6, B4.7, B4.11 Date: 09/15/2011 Location(s): Sutter County, California Office(s): Western Area Power Administration-Sierra Nevada Region, National

274

EIA - Natural Gas Pipeline System - Western Region  

U.S. Energy Information Administration (EIA) Indexed Site

Western Region Western Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Western Region Overview | Transportation South | Transportation North | Regional Pipeline Companies & Links Overview Ten interstate and nine intrastate natural gas pipeline companies provide transportation services to and within the Western Region (Arizona, California, Idaho, Nevada, Oregon, and Washington), the fewest number serving any region (see Table below). Slightly more than half the capacity entering the region is on natural gas pipeline systems that carry natural gas from the Rocky Mountain area and the Permian and San Juan basins. These latter systems enter the region at the New Mexico-Arizona and Nevada-Utah State lines. The rest of the capacity arrives on natural gas pipelines that access Canadian natural gas at the Idaho and Washington State border crossings with British Columbia, Canada.

275

Case Western University (Vestas) | Open Energy Information  

Open Energy Info (EERE)

University (Vestas) University (Vestas) Jump to: navigation, search Name Case Western University (Vestas) Facility Case Western University (Vestas) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Case Western University Developer Case Western University Energy Purchaser Sopko & Sons - excess to First Energy Location Euclid OH Coordinates 41.60216607°, -81.49763346° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.60216607,"lon":-81.49763346,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

276

Case Western University (Nordex) | Open Energy Information  

Open Energy Info (EERE)

University (Nordex) University (Nordex) Jump to: navigation, search Name Case Western University (Nordex) Facility Case Western University (Nordex) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Case Western University Developer Case Western University Energy Purchaser Stamco Inc - excess to First Energy Location Euclid OH Coordinates 41.60213398°, -81.49688244° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.60213398,"lon":-81.49688244,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

277

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado River Storage Project Management Center Colorado River Storage Project Management Center Categorical Exclusion Determinations: Western Area Power Administration-Colorado River Storage Project Management Center Categorical Exclusion Determinations issued by Western Area Power Administration-Colorado River Storage Project Management Center. DOCUMENTS AVAILABLE FOR DOWNLOAD January 25, 2011 CX-005545: Categorical Exclusion Determination Installation of Metering and Circuit Breaker at Powell 69-Kilovolt Substation CX(s) Applied: B4.11 Date: 01/25/2011 Location(s): Page, Arizona Office(s): Western Area Power Administration-Colorado River Storage Project Management Center October 26, 2009 CX-005544: Categorical Exclusion Determination Power Rate Formula for the Provo River Project of the Western Area Power

278

Western Electricity Coordinating | OpenEI  

Open Energy Info (EERE)

Western Electricity Coordinating Western Electricity Coordinating Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 117, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords AEO California EIA Renewable Energy Generation Western Electricity Coordinating Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - Western Electricity Coordinating Council / California (xls, 119.2 KiB) Quality Metrics Level of Review Peer Reviewed

279

Western North Pacific Monsoon Depression Formation  

Science Conference Proceedings (OSTI)

Relatively few studies have been carried out as to the conditions leading to the formation of monsoon depressions in the western North Pacific. Two monsoon depression formations during July 2007 were analyzed using ECMWF analyses and satellite ...

Jodi C. Beattie; Russell L. Elsberry

2012-12-01T23:59:59.000Z

280

Competitive interstate taxation of western coal  

SciTech Connect

This paper analyzes the potential market power of western states in setting coal severance taxes. An attempt to determine the emphasis placed by the western states on the development of their coal resources is also made. Three market structures are analyzed. One involves a western regional cartel, setting taxes collectively. The other cases are noncooperative tax equilibria with Montana and Wyoming competing against each other. We study the effects on these equilibria of changes in each region's relative emphasis on development of coal resources vs tax revenue. The welfare impacts of these tax setting policies are also addressed. The analysis is based on an activity analysis of US coal markets. The results show that the taxes associated with the noncooperative competitive tax equilibria are close to present tax levels. Additionally, we conclude that western states currently are quite efficient extractors of economic rent from coal produced within their boundaries, in terms of welfare loss per dollar of tax revenue collected. 2 figures.

Kolstad, C.D.; Wolak, F.A. Jr.

1983-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Western States Shale Production (Billion Cubic Feet)  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) No chart available. Western States Shale Production (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

282

Slope Control in Western Boundary Currents  

Science Conference Proceedings (OSTI)

An analytic solution is presented for the steady-state depth-averaged western boundary current flowing over the continental slope by combining three highly idealized models: the Stommel model, the Munk model, and the arrested topographic wave ...

Sang-Ki Lee; J. L. Pelegr; John Kroll

2001-11-01T23:59:59.000Z

283

Surface Mesonets of the Western United States  

Science Conference Proceedings (OSTI)

In recent years the western United States has gone from being a region with relatively sparse surface observations to one that has a number of mesoscale networks maintained by a variety of interests. Expanding population and increased ...

Donna F. Tucker

1997-07-01T23:59:59.000Z

284

Environmental Assessment of Proposed Filbert Substation and Tap Project.  

SciTech Connect

The proposal is a cooperative (jointly funded and owned) action between Bonneville Power Administration (BPS) and FGLandP involving construction of the 115/12.5-kV Filbert Substation. BPA would also build a 0.8-mile overhead 115-kV tapline from BPA's Forest Grove-McMinnville 115-kV line to the proposed substation. The Forest Grove-McMinnville transmission line has available capacity to support the proposed substation. The FGLandP would build four underground distribution circuits to connect the substation to its existing distribution system. It is normally BPA's practice to consider several substation location alternatives as a part of its facility siting process. The proposed substation site was recommended after a preliminary field evaluation by BPA determined that building on the proposed site was preferable because available sites south of the Tualatin Valley Highway and Southern Pacific Railroad were either on presently cultivated farmland, were in a floodplain, or were inaccessible without extensive access road construction. The proposed substation site is owned by FGLandP, is designated for use as a utility substation in the Forest Grove Comprehensive Plan, and was purchased by FGLandP in anticipation of a need for its use as a substation site because of its central location in relation to existing and forecasted loads. The site is accessible from Filbert Street (city road), and is gently sloping. This report describes potential environmental impacts of the proposed actions.

United States. Bonneville Power Administration.

1984-03-01T23:59:59.000Z

285

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

286

NREL: Transmission Grid Integration - Western Wind and Solar...  

NLE Websites -- All DOE Office Websites (Extended Search)

Western Wind and Solar Integration Study The Western Wind and Solar Integration Study, one of the largest regional solar and wind integration studies to date, explores the...

287

WESTERN ELECTRIC INDUSTRY LEADERS GROUP | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WESTERN ELECTRIC INDUSTRY LEADERS GROUP WESTERN ELECTRIC INDUSTRY LEADERS GROUP Halting global warming and protecting the environment have properly moved high atop the...

288

Potential source rocks in the western Kansas petroleum province.  

E-Print Network (OSTI)

??The source of the hydrocarbons in western Kansas has been an ongoing debate for many years. The highly organic-rich Anadarko basin, directly south of western (more)

Hill, Tyler J.

2011-01-01T23:59:59.000Z

289

The Folklife Archives at Western Kentucky University: Past and Present.  

E-Print Network (OSTI)

??This work focuses on Western Kentucky Universitys Folklife Archives located in Bowling Green, Kentucky. Western Kentucky University has a rich history of folklore scholarship, dating (more)

Puglia, David

2010-01-01T23:59:59.000Z

290

April 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status

291

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

292

February 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2

293

November 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Revisions 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association

294

April 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 Technical Standards Published 2 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical

295

NIST SBIR Proposals by State  

Science Conference Proceedings (OSTI)

NIST SBIR Phase I Proposals Received by State for FY1994 - FY 2013. STATE, FY94, FY95, FY96, FY97, FY98, FY99, FY00, ...

2013-07-25T23:59:59.000Z

296

Western Area Power Administration Draft Finding of No Significant Impact East Altamont Energy Center, Alameda County, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA-1411 DEPARTMENT OF ENERGY Western Area Power Administration Draft Finding of No Significant Impact East Altamont Energy Center, Alameda County, California Summary: East Altamont Energy Center, LLC (EAEC LLC), a wholly owned subsidiary of Calpine Corporation applied to the Department of Energy (DOE), Western Area Power Administration (Western) to interconnect the East Altamont Energy Center (EAEC), a 1100-megawatt (MW) natural gas-fired power plant, to Western's Tracy Substation. EAEC LLC intends to serve competitive regional markets in California with power from the EAEC. Western proposes to make modifications at its Tracy Substation to accommodate the interconnection. The EAEC is a merchant plant which means that it would be independent of other generators and that the power generated would serve

297

Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0  

DOE Green Energy (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-05-08T23:59:59.000Z

298

Impacts of Western Area Power Administration`s power marketing alternatives on utility demand-side management and conservation and renewable energy programs  

SciTech Connect

The Western Area Power Administration (Western) requires all of its long-term firm power customers to implement programs that promote the conservation of electric energy or facilitate the use of renewable energy resources. Western has also proposed that all customers develop integrated resource plans that include cost-effective demand-side management programs. As part of the preparation of Western`s Electric Power Marketing Environmental Impact Statement, Argonne National Laboratory (ANL) developed estimates of the reductions in energy demand resulting from Western`s conservation and renewable energy activities in its Salt Lake City Area Office. ANL has also estimated the energy-demand reductions from cost-effective, demand-side management programs that could be included in the integrated resource plans of the customers served by Western`s Salt Lake City Area Office. The results of this study have been used to adjust the expected hourly demand for Western`s major systems in the Salt Lake City Area. The expected hourly demand served as the basis for capacity expansion plans develops with ANL`s Production and Capacity Expansion (PACE) model.

Cavallo, J.D.; Germer, M.F.; Tompkins, M.M.

1995-03-01T23:59:59.000Z

299

EA-1755: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1755: Mitigation Action Plan Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico EA prepared for the proposed reconstruction of the Waste Isolation Pilot Plant (WIPP) South Access Road (County Road 802) located in Eddy County, New Mexico. Through the environmental review process, the Bureau of Land Management Carlsbad Field Office (BLM CFO) determined that there would be potential environmental impacts from the proposed project that would require mitigation to assure that the impacts would not become significant. Therefore, the Department of Energy Carlsbad Field Office (CBFO) prepared this Mitigation Action Plan (MAP) to establish conditions for issuing its

300

Climate Action Plan (Manitoba, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

302

Standards Actions, February 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standards Recently Published 1 Non-Government Standards 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 5 American Society for Testing and Materials (ASTM) 6 American Nuclear Society (ANS) 11 National Fire Protection Association (NFPA) 12 DOE Technical Standards Program Document Status 01-23-2004 Activity Summary In Conversion - 4 In Preparation - 36 Out for Comment - 23 Published in January - 3 5-year Review Status Revision in Progress - 13 Reaffirmation in Progress - 26 Cancellation Pending - 1 Cancellation in Progress - 3 No Current Action - 0 Inside This Visit the Technical Standards Program

303

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

304

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

305

April 2011 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3009 3009 Revision * DOE Standard 1066 Revision * New DOE Standards Projects * Incidents of Security Concern Technical Standard * Explosives Safety * Operations Assessment Field Handbook * Reporting of Radioactive Sealed Sources Program * Occurrence Reporting Causal Analysis Guide * Nuclear Safety-Related Standards Activity INSIDE THIS ISSUE April 2011 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Standard 3009 Revision The Office of Nuclear Safety Policy and Assistance (HS-21), within the Office of Health, Safety and Security (HSS), conducted workshops in January and March to support a major revision of Department of Energy (DOE) Standard 3009, Preparation Guide for U.S. Department of Energy Nonreactor

306

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

307

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

308

VIOLENT FRAMES IN ACTION  

Science Conference Proceedings (OSTI)

We present a computational approach to radical rhetoric that leverages the co-expression of rhetoric and action features in discourse to identify violent intent. The approach combines text mining and machine learning techniques with insights from Frame Analysis and theories that explain the emergence of violence in terms of moral disengagement, the violation of sacred values and social isolation in order to build computational models that identify messages from terrorist sources and estimate their proximity to an attack. We discuss a specific application of this approach to a body of documents from and about radical and terrorist groups in the Middle East and present the results achieved.

Sanfilippo, Antonio P.; McGrath, Liam R.; Whitney, Paul D.

2011-11-17T23:59:59.000Z

309

Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

Bechtel Nevada

1998-09-30T23:59:59.000Z

310

Improved Perturbation Theory for Improved Lattice Actions  

E-Print Network (OSTI)

We study a systematic improvement of perturbation theory for gauge fields on the lattice; the improvement entails resumming, to all orders in the coupling constant, a dominant subclass of tadpole diagrams. This method, originally proposed for the Wilson gluon action, is extended here to encompass all possible gluon actions made of closed Wilson loops; any fermion action can be employed as well. The effect of resummation is to replace various parameters in the action (coupling constant, Symanzik coefficients, clover coefficient) by ``dressed'' values; the latter are solutions to certain coupled integral equations, which are easy to solve numerically. Some positive features of this method are: a) It is gauge invariant, b) it can be systematically applied to improve (to all orders) results obtained at any given order in perturbation theory, c) it does indeed absorb in the dressed parameters the bulk of tadpole contributions. Two different applications are presented: The additive renormalization of fermion masses, and the multiplicative renormalization Z_V (Z_A) of the vector (axial) current. In many cases where non-perturbative estimates of renormalization functions are also available for comparison, the agreement with improved perturbative results is significantly better as compared to results from bare perturbation theory.

M. Constantinou; H. Panagopoulos; A. Skouroupathis

2006-05-31T23:59:59.000Z

311

Mitigation Action Plans (MAP) and Related Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1, 2010 December 1, 2010 EA-1782: Mitigation Action Plan University of Delaware Lewes Campus Onsite Wind Energy Project September 1, 2010 EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi August 24, 2010 EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico July 10, 2010 EIS-0026: 2010 Annual Mitigation Report Waste Isolation Pilot Plant June 4, 2010 EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi January 1, 2010 EA-1755: Mitigation Action Plan

312

EA-1901: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Mitigation Action Plan 1: Mitigation Action Plan EA-1901: Mitigation Action Plan Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This Mitigation Action Plan (MAP) is referenced in the Finding of No Significant Impact for the Kootenai River White Sturgeon and Burbot Hatcheries Project (Department of Energy Environmental Assessment-1901). This MAP includes all of the mitigation measures recommended in the Final Environmental Assessment to mitigate adverse environmental impacts. It includes some measures that are essential to render the impacts of the Proposed Action not significant and other measures that will decrease impacts that did not reach a level to be considered significant. EA-1901-MAP-2013.pdf More Documents & Publications

313

EA-1706: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

706: Mitigation Action Plan 706: Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - allowing the State of Tennessee to use some of its State Energy Program funds appropriated in the American Recovery and Reinvestment Act to construct and operate the West Tennessee Solar Farm Project - would not result in any significant environmental impacts. Mitigation Action Plan for the West Tennessee Solar farm Project Haywood County, Tennessee, DOE/EA-1706 More Documents & Publications EA-1706: Finding of No Significant Impact EA-1706: Final Environmental Assessment 2012 Annual Planning Summary for Fossil Energy, National Energy Technology

314

DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for  

NLE Websites -- All DOE Office Websites (Extended Search)

Institutes Enforcement Action against 4 Showerhead Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products January 28, 2010 - 1:49pm Addthis WASHINGTON DC - The Office of General Counsel has issued Notices of Proposed Civil Penalty to Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs, Ltd. for failing to certify to the Department of Energy that showerheads manufactured or distributed by these companies meet the applicable water conservation standard as required by the Energy Policy Conservation Act and DOE's regulations. These Notices of Proposed Civil Penalty collectively propose payments to the government of over $3 million. Unless the manufacturers settle these claims within

315

NREL Variability Analysis for the Western Interconnect (Presentation)  

DOE Green Energy (OSTI)

This presentation investigates the effects of several Energy Imbalance Markets implementations in the Western Interconnect.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

316

www.uwo.ca/sci Discover yourself at Western  

E-Print Network (OSTI)

www.uwo.ca/sci Science at Western Discover yourself at Western including the Bachelor of Medical Sciences (BMSc) Program www.uwo.ca/bmscc #12;The University of Western Ontario Science at Western|2010|www.uwo.ca/sci Dear Student, Your interests and skills have guided you to seek higher education in the sciences. I am

Christensen, Dan

317

January 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 12-27-2007 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 26 Published in December - 4 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/

318

November 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-29-2007 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 30 Published in October - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/

319

February 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 01-28-2008 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 24 Published in January - 3 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/

320

Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2  

SciTech Connect

The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

Not Available

1994-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1  

SciTech Connect

The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

Not Available

1994-04-01T23:59:59.000Z

322

REMEDIAL ACTION PLAN  

E-Print Network (OSTI)

designated site consists of the 111-acre tailings pile, the mill yard, and piles of demolition rubble awaiting burial. The site contains 2.659 million cubic yards of tailings including 277,000 cubic yards of contaminated material in the mill yard, ore storage area, and Ann Lee Mine area; 151,000 cubic yards in the protore storage and leach pad areas; and 664,000 cubic yards of windblown contaminated soil, including excess soil that would result from excavation. Remedial action The remedial action will start with the excavation of windblown contaminated material and placement around the west, south, and east sides of the pile to buttress the slopes for increased stability. Most of the demolition rubble will be placed in the southern part of the pile and be covered with tailings. The northern part of the tailings pile (one million cubic yards) will then be excavated and placed on the south part of the pile to reduce the size of the disposal cell footprint. Demolition rubble that

Inactive Uranium; Mill Tailings Site; Uranium Mill Tremedial

1990-01-01T23:59:59.000Z

323

Proposed Rules DEPARTMENT OF ENERGY  

NLE Websites -- All DOE Office Websites (Extended Search)

Register Vol. 77, No. 28 Friday, February 10, 2012 Proposed Rules DEPARTMENT OF ENERGY 10 CFR Part 431 Docket Number EERE-2010-BT-STD- 0048 RIN 1904-AC04 Energy...

324

Federal Energy Management Program: Energy Action Month  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Action Month to someone by E-mail Share Federal Energy Management Program: Energy Action Month on Facebook Tweet about Federal Energy Management Program: Energy Action Month...

325

Western Greenbrier Co-Production Demonstration Project  

NLE Websites -- All DOE Office Websites (Extended Search)

contacts contacts Brad tomer Director Office of Major Demonstrations National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4692 brad.tomer@netl.doe.gov nelson Rekos Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4066 nelson.rekos@netl.doe.gov PaRtIcIPant Western Greenbrier Co-Generation, LLC Lewisburg, WV Western Greenbrier Co-ProduCtion demonstration ProjeCt (disContinued) Project Description The Western Greenbrier Co-Production (WGC) project will generate about 100 megawatts of electricity and commercial quantities of salable ash by-products by burning waste coal presently contained in numerous coal refuse dumps in the vicinity of the plant. These refuse dumps, created by coal cleaning operations over

326

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 1, 2013 April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region January 23, 2013 CX-009804: Categorical Exclusion Determination Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line CX(s) Applied: B4.1, B4.11 Date: 01/23/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

327

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 29, 2012 March 29, 2012 CX-008407: Categorical Exclusion Determination Terry Ranch Road Substation CX(s) Applied: B1.24, B4.11 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region March 29, 2012 CX-008403: Categorical Exclusion Determination Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 29, 2012 CX-008399: Categorical Exclusion Determination Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

328

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 23, 2010 November 23, 2010 CX-004887: Categorical Exclusion Determination Cable and Conduit Addition Within the Fenced Area of the Buck Boulevard Substation CX(s) Applied: B4.6 Date: 11/23/2010 Location(s): Riverside County, California Office(s): Western Area Power Administration-Desert Southwest Region November 23, 2010 CX-007129: Categorical Exclusion Determination Buck Boulevard Substation CX(s) Applied: B4.6 Date: 11/23/2010 Location(s): Ripley, California Office(s): Western Area Power Administration-Desert Southwest Region November 5, 2010 CX-004898: Categorical Exclusion Determination Gila-Wellton-Mohawk (Structure Maintenance) CX(s) Applied: B1.3 Date: 11/05/2010 Location(s): Yuma County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

329

Case Western University | Open Energy Information  

Open Energy Info (EERE)

University University Facility Case Western University Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Case Western University Energy Purchaser Case Western University Location Cleveland OH Coordinates 41.50239055°, -81.60550386° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.50239055,"lon":-81.60550386,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

330

Western Massachusetts Electric - Commercial Energy Efficiency Rebates |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Massachusetts Electric - Commercial Energy Efficiency Western Massachusetts Electric - Commercial Energy Efficiency Rebates Western Massachusetts Electric - Commercial Energy Efficiency Rebates < Back Eligibility Commercial Industrial Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Other Heating Heat Pumps Appliances & Electronics Commercial Lighting Lighting Maximum Rebate Pre-approval required for rebates greater than $5,000 Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Small Business Program: up to 70% of cost, zero percent financing on remainder Custom: based on energy savings Retrofit Pay-for-Performance Incentive: $0.75/kWh or therm saved Lighting: Varies, see program web site Vending Machine Controls: $45 - $115 Variable Speed Drive (Retrofit): $2,550 - $10,500

331

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 16, 2009 December 16, 2009 CX-000556: Categorical Exclusion Determination Willoby Substation Construction Project-Weld County, Colorado CX(s) Applied: B4.11 Date: 12/16/2009 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region December 2, 2009 CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region November 16, 2009 CX-000554: Categorical Exclusion Determination Ogallala Substation KY1A Transformer Replacement CX(s) Applied: B4.6 Date: 11/16/2009 Location(s): Ogallala, Nebraska Office(s): Western Area Power Administration-Rocky Mountain Region

332

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2, 2011 May 2, 2011 CX-007145: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade Amendment CX(s) Applied: B1.3 Date: 05/02/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region April 28, 2011 CX-007144: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade Amendment CX(s) Applied: B1.3 Date: 04/28/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region April 28, 2011 CX-007132: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade Amendment CX(s) Applied: B4.13 Date: 04/28/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

333

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 11, 2010 March 11, 2010 CX-007156: Categorical Exclusion Determination New Waddell-Raceway-Westwing Structure Replacement CX(s) Applied: B4.6, B4.13 Date: 03/11/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region February 18, 2010 CX-007167: Categorical Exclusion Determination Rogers-Coolidge Danger Tree Removal CX(s) Applied: B1.3 Date: 02/18/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region December 31, 2009 CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

334

Western Area Power Administration customer database  

SciTech Connect

This report describes a comprehensive customer database compiled by the Pacific Northwest Laboratory (PNL) to assist with analyses conducted as part of the Western Area Power Administration Energy Planning and Management Program Environmental Impact Statement (EIS). The database was used by PNL as a tool to help select a sample of Western customers for potential participation in the Organizational Impacts Analysis case studies, and was used as part of the Utility Impact Analysis to identify sources and costs of auxiliary power. Secondary information sources were used predominantly to compile one year of system related information on the Western customers (over 600) included in the database. This information was useful for its intended purposes; however, year-to-year information may not be consistent across utilities and not all information was available for each utility.

Sandahl, L.J.; Lee, A.D.; Wright, G.A.; Durfee, D.L.

1993-05-01T23:59:59.000Z

335

Volatile organic compound remedial action project  

SciTech Connect

This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

NONE

1991-12-01T23:59:59.000Z

336

Standards Actions - January 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Initiated Projects Initiated The following DOE Technical Standards projects were recently initiated. If you have any questions or are interested in participating in the development of these stan- dards, please contact the per- sons listed below. • Establishing and Maintaining a Facility Representative Pro- gram at DOE Facilities , Project Number MGMT-0003 (revision of DOE-STD-1063-97); David Compton, S-3.1, 202-586-1034, Fax 202-586-3472, David .Compton@hq.doe.gov. • Nuclear Explosive Safety Study Process, Project Number SAFT- 0074 (Revision of DOE-STD- 3015-97); Helmut Filacchione, DP-21, 301-903-7519, Fax 301- 903-8628, Helmut.Filacchione @hq.doe.gov. DOE Technical Standards Project Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact

337

January 2012 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* DOE Conduct of Operations Standards Revisions * New DOE Standards Projects * DOE Handbook of Operational Safety and Analysis Techniques * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE January 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Conduct of Operations Standards Revisions In the early 1990s, the Department of Energy (DOE) developed 17 technical standards to support DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The standards (STDs), listed below, provided examples, good practices, and expanded explanations of the topics in each chapter of the Order. In June 2010, the Order was revised and issued as DOE Order 422.1, Conduct of Operations. The

338

Standards Actions - August 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

339

Standards Actions - August 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

340

February 2013 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Standards Actions Technical Standards Program Newsletter U . S . D E PA R T M E N T O F O ffi ce O f nuclear SaFety ENERGY inSide thiS iSSue * Featured DOE Technical Standards Activities * DOE Technical Standards Cost- Savings and Access Improvement Initiative * Domestic and International Nuclear Energy Voluntary Consensus Standards Needs * Nuclear Safety- Related Standards Activity Featured dOe technical StandardS activitieS DOE Technical Standards Cost-Savings and Access Improvement Initiative By Helen Todosow, Brookhaven National Laboratory The Department of Energy (DOE) Technical Standards Managers (TSM) are actively exploring ways to save the government and tax payers' money while at the same time significantly improving efficiencies in access and use of voluntary consensus

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Standards Actions, April 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canceled Canceled The following DOE Technical Standards projects were recently canceled. If you have any questions about this action, please contact the persons listed below. • Accelerated Learning - A Systematic Approach, Project Number 6910-0061; Eula Baldwin, EH-31; 208-526-9472, egb@inel.gov. The need for this document no longer exists. • Environmental Safety and Health Configuration Guide, Project Number FACR-0013; Chan- dra S. Majumdar, EM-23; 301-903-7904, Fax 301-903-4423, Chandra.Majumdar @em.doe.gov. The need for a DOE Technical Standard on this matter no longer exists. • Occupational Safety and Health Handbook, Project Number HFAC-0011; Terry Krietz, EH-51; 301-903-6456, Fax 301-903-2239, Terry.Krietz@hq.doe.gov. The need for this document no longer exists.

342

Standards Actions - May 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Canceled Project Canceled The following DOE Technical Standards project was recently canceled. If you have any questions about this action, please contact the person listed below. • Equipment Qualification Program for DOE-Owned Nuclear Facilities and Operations, Project Number FACR-0012; Samuel Rosenbloom, EH-31; 301-903-5749, Fax 301-903- 8693, Samuel.Rosenbloom@eh.doe.gov. The need for this document no longer ex- ists. DOE Technical Standards Recently Published The following DOE Technical Standard has recently been published: • DOE-STD-1063-2000, Facility Representatives, March 2000. This document updates and supersedes DOE-STD-1063-97, October 1997. DOE employees and DOE contractors may obtain copies from the ES&H Technical Infor- mation Services, U.S. Department of Energy; 1-800-473-4375, Fax 301-903-9823.

343

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

344

Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral  

Open Energy Info (EERE)

Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Jump to: navigation, search Tool Summary Name: Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Agency/Company /Organization: GTZ Sector: Energy Focus Area: Transportation Topics: Implementation, Pathways analysis Resource Type: Publications Website: www.transport2012.org/bridging/ressources/files/1/817,Transport_sector Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Screenshot References: Reducing Emissions Through Sustainable Transport[1] Summary "The large mitigation potential and associated co-benefits of taking action in the land transport sector can be tapped into by a sectoral approach drawing financial resources from a transport window, in the short term

345

Secretary Bodman Praises Western States' "Frontier Line" | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises Western States' "Frontier Line" Praises Western States' "Frontier Line" Secretary Bodman Praises Western States' "Frontier Line" April 5, 2005 - 11:30am Addthis WASHINGTON, DC - Secretary of Energy Samuel W. Bodman today released the following statement regarding the "Frontier Line" announced by Governors Arnold Schwarzenegger (CA), Kenny Guinn (NV), Jon Huntsman (UT), and David Freudenthal (WY): "This proposal exhibits the boldness and innovation the West is traditionally known for, as well as the multi-state cooperation and big-picture thinking required to make regional markets thrive," Secretary Bodman said. "At the federal level, the President's comprehensive energy strategy that Congress will begin working on this week calls for upgrades to our electric grid to help prevent future brownouts or

346

Proposal Calendar | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Calendar Proposal Calendar 2014 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2014-1 Fri Nov-1-13 Tue Nov-19-13 Tue Dec-10-13 ~Dec-18-13 Tue Jan-28-14 Tue Apr-21-14 2014-2 Fri Mar-7-14 Tue Mar-25-14 Tue Apr-8-14 ~Apr-21-14 ~ May-14 ~Aug-14 2014-3 Fri Jul-11-14 Tue Jul-29-14 Tue Aug-12-14 ~Aug-25-14 ~ Oct-14 ~Dec-14 2015 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2015-1 Fri Oct-31-14 Tue Nov-18-14 Tue Dec--2-14 ~Dec-14-14 ~Jan-15 ~Apr-15 2015-2 Fri Mar-6-15 Tue Mar-24-15 Tue Apr-7-15 ~Apr-20-15 ~ May-15 ~Aug-15 2015-3 Fri Jul-10-15 Tue Jul-28-15 Tue Aug-11-15 ~Aug-24-15 ~ Oct-15 ~Dec-15 2016 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends

347

(DOE/EIS-0128): Mitigation Action Plan for the Los Banos-Gates Transmission project 1/28/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: ____________________________ 1 Date: ____________________________ 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a Power Marketing Administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi- use water projects in the western United States, including California. The

348

EIS-0469: Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to one of DOEs Western Area Power Administrations existing substations and to operate NextEras existing wind projects in this area above 50 annual MW.

349

JGI - CSP Proposal Study Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

User Programs User Programs Project Management Office Community Science Program Emerging Technologies Opportunity Program Technology Development Pilot Program Genomic Encyc. of Bacteria and Archaea MyJGI: Information for Collaborators The CSP Proposal Study Panel CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | Project Management | Forms | FAQ | People and Contacts Members Nina Agabian University of California, San Francisco, http://www.ucsf.edu Chris Amemiya Benaroya Research Institute at Virginia Mason, http://www.benaroyaresearch.org Gary L. Andersen Lawrence Berkeley National Laboratory, http://www.lbl.gov Jo Ann Banks Purdue University, http://www.purdue.edu John Battista Louisiana State University, http://www.lsu.edu Fred Brockman

350

III. Waiver of Proposed Rulemaking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

382 Federal Register 382 Federal Register / Vol. 77, No. 241 / Friday, December 14, 2012 / Rules and Regulations technical errors in § 447.400(a) and § 447.405 listed on page 66701. One correction ensures consistency between two sentences in the same paragraph and the other restores text inadvertently omitted from the final rule that had been included in the May 11, 2012 notice of proposed rulemaking (77 FR 27671) on pages 26789-90. Thus, we are correcting page 66701 to reflect the correct information. III. Waiver of Proposed Rulemaking We ordinarily publish a notice of proposed rulemaking in the Federal Register to provide a period for public comment before the provisions of a rule take effect in accordance with section 553(b) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). However,

351

The Western Boundary Undercurrent off the Bahamas  

Science Conference Proceedings (OSTI)

Two tritium sections through the deep western boundary current east of the Bahamas taken in late 1980 and early 1981 are presented. Tritium from the bomb tests in the late 1950s and early 1960s is used to identify recently formed deep waters in ...

Donald B. Olson; Gote H. Ostlund; Jorge Sarmiento

1986-02-01T23:59:59.000Z

352

Western North Pacific Typhoons with Concentric Eyewalls  

Science Conference Proceedings (OSTI)

This study examines the intensity change and moat dynamics of typhoons with concentric eyewalls using passive microwave data and best-track data in the western North Pacific between 1997 and 2006. Of the 225 typhoons examined, 55 typhoons and 62 ...

Hung-Chi Kuo; Chih-Pei Chang; Yi-Ting Yang; Hau-Jang Jiang

2009-11-01T23:59:59.000Z

353

Western University Nuclear Radiation Safety Inspection Checklist  

E-Print Network (OSTI)

with unsealed nuclear substances. Print out of wipe test kept in the logbook . For safety work practices, rightMay 2012 Western University Nuclear Radiation Safety Inspection Checklist Permit Holder to nuclear substances or radiation devices is restricted to authorized radiation users listed on the permit

Sinnamon, Gordon J.

354

Food Security in the Western US  

E-Print Network (OSTI)

Food Security in the Western US and Pacific Territories 23 Rural Connections Nov. 2009 By PeteR BaRcinas ADAP is tackling the food security implications of climate change, rising sea levels, and fuel costs Pacific (aDaP) Regional Food security and Sufficiency Project brings together community, local, state

355

REDD+ Country Readiness Preparation Proposals | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » REDD+ Country Readiness Preparation Proposals Jump to: navigation, search Tool Summary LAUNCH TOOL Name: REDD+ Country Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Focus Area: Forestry Topics: Implementation, Policies/deployment programs, Pathways analysis Resource Type: Publications, Guide/manual Website: www.wri.org/publication/getting-ready Country: Democratic Republic of Congo, Ghana, Guyana, Indonesia, Madagascar, Mexico, Suriname, Panama Middle Africa, Western Africa, South America, South-Eastern Asia, Eastern Africa, Central America, South America, Central America

356

Multi-site Action Research .  

E-Print Network (OSTI)

??Classical action research within single organizations has become a well established and differentiated approach since its inception more than six decades ago. Although new larger (more)

Fuller-Rowell, Thomas

2007-01-01T23:59:59.000Z

357

JAS - a Java action semantics  

E-Print Network (OSTI)

Brown,D.F. Watt,D.A. Proceedings of 2nd International Workshop on Action Semantics pp 43-56 Dept of Computer Science, University of Aarhus

Brown, D.F.; Watt, D.A.

358

EERE Postdoctoral Research Awards: Research Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals on Twitter Bookmark EERE Postdoctoral Research Awards: Research Proposals on Google Bookmark EERE Postdoctoral Research Awards: Research Proposals on Delicious Rank EERE...

359

Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final  

SciTech Connect

This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

Not Available

1994-03-01T23:59:59.000Z

360

Environmental assessment of proposed geothermal well testing in the Tigre Lagoon Oil Field, Vermilion Parish, Louisiana  

DOE Green Energy (OSTI)

An environmental assessment is made of the proposed testing of two geopressured, geothermal aquifers in central coastal Louisiana. On the basis of an analysis of the environmental setting, subsurface characteristics, and the proposed action, potential environmental impacts are determined and evaluated together with potential conflicts with federal, state, and local programs. (LBS )

Not Available

1976-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

of Western Area Power Administration's Cyber Security Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Western Area Power Administration's Cyber Security Program DOE/IG-0873 October 2012 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 October 22, 2012 MEMORANDUM FOR THE UNDER SECRETARY OF ENERGY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Western Area Power Administration's Cyber Security Program" INTRODUCTION AND OBJECTIVE The Department of Energy's Western Area Power Administration (Western) markets and delivers hydroelectric power and related services to 15 states within the central and western United States. As the largest U.S. Power Marketing Administration, millions of households and

362

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed - Appendix C  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX C: APPENDIX C: Data Sheets for New Products Table of Contents Product Page Product Page Commercial Refrigeration Miscellaneous Residential Equipment Standards Consideration C-1 Standards Consideration C-50 Beverage Merchandisers Test Procedure Summary C-3 Ceiling Fans Test Procedure Summary C-52 Standards Consideration C-4 Compact Audio Standards Consideration C-53 Ice Machines Test Procedure Summary C-6 Component Stereo and Rack Audio Standards Consideration C-54 Reach-In Freezers Standards Consideration C-7 Compact Audio, Component Stereo, and Rack Audio Test Procedure Summary C-55 Reach-In Refrigerators Standards Consideration C-9 Standards Consideration C-56 Reach-In Freezers/Refrigerators Test Procedure Summary C-11 Dehumidifiers

363

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed -Appendix A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A: A: Technical Support Document (TSD) Appendixes i A1 Introduction ........................................................................................ A1-1 A1.1 Methodology for Energy Consumption and Savings Estimate............... A1-2 A1.2 Energy Consumption and Savings Calculation Methodology ................ A1-3 A1.2.1 Device Annual Energy Consumption (AEC) Estimates ...........................A1-3 A1.2.1.1 Equipment Stock, S...................................................................................A1-4 A1.2.1.2 Usage Pattern ..........................................................................................A1-5 A1.2.1.3 Power draw by mode, P ...........................................................................A1-5 A1.2.2 Energy Savings Estimates

364

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX B: APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers Standards* Low B-5 Lamps, Incandescent General Service Standards Low B-31 Test Procedure* Low B-6 Test Procedure Low B-32 Commercial Water-Cooled A/C & Water- Source Heat Pumps Standards Low B-7 Lamps, Incandescent Reflector Standards Low B-33

365

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX B: APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers Standards* Low B-5 Lamps, Incandescent General Service Standards Low B-31 Test Procedure* Low B-6 Test Procedure Low B-32 Commercial Water-Cooled A/C & Water- Source Heat Pumps Standards Low B-7 Lamps, Incandescent Reflector Standards Low B-33

366

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed -Appendix A  

NLE Websites -- All DOE Office Websites (Extended Search)

A: A: Technical Support Document (TSD) Appendixes i A1 Introduction ........................................................................................ A1-1 A1.1 Methodology for Energy Consumption and Savings Estimate............... A1-2 A1.2 Energy Consumption and Savings Calculation Methodology ................ A1-3 A1.2.1 Device Annual Energy Consumption (AEC) Estimates ...........................A1-3 A1.2.1.1 Equipment Stock, S...................................................................................A1-4 A1.2.1.2 Usage Pattern ..........................................................................................A1-5 A1.2.1.3 Power draw by mode, P ...........................................................................A1-5 A1.2.2 Energy Savings Estimates

367

Implementation Proposal for the National Action Plan on Demand Response- July 2011  

Energy.gov (U.S. Department of Energy (DOE))

Report to Congress prepared by the staff of the Federal Energy Regulatory Commission (FERC) and theDepartment of Energy.

368

Baseline requirements of the proposed action for the Transportation Management Division routing models  

Science Conference Proceedings (OSTI)

The potential impacts associated with the transportation of hazardous materials are important to shippers, carriers, and the general public. This is particularly true for shipments of radioactive material. The shippers are primarily concerned with safety, security, efficiency, and equipment requirements. The carriers are concerned with the potential impact that radioactive shipments may have on their operations--particularly if such materials are involved in an accident. The general public has also expressed concerns regarding the safety of transporting radioactive and other hazardous materials through their communities. Because transportation routes are a central concern in hazardous material transport, the prediction of likely routes is the first step toward resolution of these issues. In response to these routing needs, several models have been developed over the past fifteen years at Oak Ridge National Laboratory (ORNL). The HIGHWAY routing model is used to predict routes for truck transportation, the INTERLINE routing model is used to predict both rail and barge routes, and the AIRPORT locator model is used to determine airports with specified criteria near a specific location. As part of the ongoing improvement of the US Department of Energy`s (DOE) Environmental Management Transportation Management Division`s (EM-261) computer systems and development efforts, a Baseline Requirements Assessment Session on the HIGHWAY, INTERLINE, and AIRPORT models was held at ORNL on April 27, 1994. The purpose of this meeting was to discuss the existing capabilities of the models and data bases and to review enhancements of the models and data bases to expand their usefulness. The results of the Baseline Requirements Assessment Section will be discussed in this report. The discussions pertaining to the different models are contained in separate sections.

Johnson, P.E.; Joy, D.S.

1995-02-01T23:59:59.000Z

369

Proposed Action and Alternatives 2-40 Big Eddy-Knight Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Project Final EIS July 2011 Figure 2-18. View of BPA's Big Eddy Substation from Columbia View Drive (looking east) Figure 2-19. View of Entrance to Big Eddy...

370

Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado  

SciTech Connect

The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

Not Available

1993-09-01T23:59:59.000Z

371

Proposed Evanston Offshore Wind Farm  

NLE Websites -- All DOE Office Websites (Extended Search)

Evanston Offshore Wind Farm Evanston Offshore Wind Farm August 1, 2011 Monday, August 1, 2011 Off Shore Wind Farm FAQ Document available from http://www.greenerevanston.org/ at the Renewable Energy Task Force tab Monday, August 1, 2011 City Manager Commits to City to sign onto Kyoto emissions reduction goals Wind Farm Timeline April 2006 Summer 2007 Fall 2008 February 2008 April 2010 March 2011 July 2011 Network for Evanston's Future proposes joint climate planning effort CGE Formed and Renewable Energy Task Force formed - Wind farm concept begun ECAP passed by City Council with 1st version of proposed Offshore Wind Farm included Offshore Wind Farm RFI unanimously passed by City Council Mayor Tisdahl appointments Committee on the Wind Farm City Council

372

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network (OSTI)

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

373

Feature Seeding for Action Recognition Pyry Matikainen Rahul Sukthankar  

E-Print Network (OSTI)

points (STIP) [15]. Note that we are not proposing a complete system for action recognition; we consider descriptors per frame of video, while STIP-HOF produces closer to 100 descriptors per frame. These descriptors (STIP-HOF). This method finds sparse interest points in space and time, and computes HOF descriptors

Guestrin, Carlos

374

EA-1440-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1440-S1: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex, Golden, Colorado ThIs Mitigation Action Plan implements the mitigation measures associated with the potential environmental impact of a DOE proposal that consists of three site development projects at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site at Golden, Colorado: Construction of the Research Support Facilities (RSF), a new office building or multi-building office complex; Installation of Phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant

375

Search for Chiral Fermion Actions on Non-Orthogonal Lattices  

E-Print Network (OSTI)

The graphene-inspired fermion actions recently proposed by Creutz and Borici have sparked interest in the use of non-orthogonal lattices in lattice QCD. These fermion actions have the desired chiral symmetry and have the minimal doubling required by the Nielsen-Ninomiya no-go theorem. However, due to the lack of discrete symmetries, radiative corrections in the gauged lattice theory will lead to the generation of unwanted relevant and marginal operators. Other similarly motivated non-orthogonal fermion actions avoid these unwanted operators, but introduce incorrect continuum behavior or excessive fermion doubling. A delicate balance of symmetry is required for chiral symmetry, minimal doubling, and no relevant operators, and to date, no non-orthogonal lattice action has accomplished this balance.

Michael I. Buchoff

2008-09-23T23:59:59.000Z

376

G20 Anti-Corruption Action Plan Action Point 7: Protection of Whistleblowers  

E-Print Network (OSTI)

whistleblowers as one of the high priority areas in their global anticorruption agenda. Recognizing the importance of effective whistleblower protection laws, Leaders, in point 7 of the G20 Anti-Corruption Action Plan, called on G20 countries to lead by: To protect from discriminatory and retaliatory actions whistleblowers who report in good faith suspected acts of corruption, G-20 countries will enact and implement whistleblower protection rules by the end of 2012. To that end, building upon the existing work of organisations such as the OECD and the World Bank, G-20 experts will study and summarise existing whistleblower protection legislation and enforcement mechanisms, and propose best practices on whistleblower protection legislation. The G20 Anti-Corruption Working Group (AWG), in charge of carrying out the Action Plan assigned the OECD the task of preparing a concept note with proposals to implement this point. Following a discussion of the concept note at their meeting on 25-26 February 2010 in Paris, the G20 Members reiterated the value of a study of the main features of whistleblower protection frameworks currently in place in G20 countries, together with guiding principles and best

unknown authors

2010-01-01T23:59:59.000Z

377

VEE-0040- In the Matter of Western Star Propane, Inc.  

Energy.gov (U.S. Department of Energy (DOE))

On February 18, 1997, Western Star Propane, Inc. (Western) filed an Application for Exception with the Office of Hearings and Appeals (OHA) of the Department of Energy (DOE). In its application,...

378

10 Year Transmission Plan for the Western Electricity Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

379

Coolerado 5 Ton RTU Performance: Western Cooling Challenge Results (Revised)  

Science Conference Proceedings (OSTI)

The Western Cooling Efficiency Center (WCEC) developed a set of criteria for test conditions, minimum energy, and water use performance for prototype cooling equipment and identified these conditions as indicative of western state climates.

Kozubal, E.; Slayzak, S.

2010-11-01T23:59:59.000Z

380

Western States Coalbed Methane Proved Reserves (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Western States Coalbed Methane Proved Reserves (Billion Cubic Feet) Western States Coalbed Methane Proved Reserves (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Western States Coalbed Methane Production (Billion Cubic Feet...  

Annual Energy Outlook 2012 (EIA)

Western States Coalbed Methane Production (Billion Cubic Feet) Western States Coalbed Methane Production (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

382

The Western Arctic Linkage Experiment (WALE): Overview and Synthesis  

Science Conference Proceedings (OSTI)

The primary goal of the Western Arctic Linkage Experiment (WALE) was to better understand uncertainties of simulated hydrologic and ecosystem dynamics of the western Arctic in the context of 1) uncertainties in the data available to drive the ...

A. D. McGuire; J. E. Walsh; J. S. Kimball; J. S. Clein; S. E. Euskirchen; S. Drobot; U. C. Herzfeld; J. Maslanik; R. B. Lammers; M. A. Rawlins; C. J. Vorosmarty; T. S. Rupp; W. Wu; M. Calef

2008-06-01T23:59:59.000Z

383

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection  

SciTech Connect

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

Milligan, M.; Clark, K.; King, J.; Kirby, B.; Guo, T.; Liu, G.

2013-03-01T23:59:59.000Z

384

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 19, 2011 May 19, 2011 CX-005981: Categorical Exclusion Determination Curecanti Substation Containment Wall, Montrose County, Colorado CX(s) Applied: B1.6 Date: 05/19/2011 Location(s): Montrose County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region May 18, 2011 CX-005937: Categorical Exclusion Determination Boyd-Valley Transmission Line Optical Ground Wire Fiber Optic Installation, Larimer County, Colorado CX(s) Applied: B4.7 Date: 05/18/2011 Location(s): Larimer County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region May 17, 2011 CX-006244: Categorical Exclusion Determination Craig-Bears Ears-Hayden Substations Fiber Optic and Pole Installation, Moffat and Routt Counties, Colorado CX(s) Applied: B4.6, B4.7 Date: 05/17/2011

385

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 24, 2013 April 24, 2013 CX-010097: Categorical Exclusion Determination Herbicide Application at Lone Butte Substation During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/24/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region April 19, 2013 CX-010096: Categorical Exclusion Determination Herbicide Application at 36 Substations Located in Arizona and California During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/19/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region April 8, 2013 CX-010098: Categorical Exclusion Determination Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none

386

Western Resource Advocates | Open Energy Information  

Open Energy Info (EERE)

Advocates Advocates Jump to: navigation, search Logo: Western Resource Advocates Name Western Resource Advocates Address 2260 Baseline Road Place Boulder, Colorado Zip 80302 Region Rockies Area Website http://www.westernresourceadvo Notes Non-profit environmental law and policy organization developing strategic programs in three areas: Water, Energy and Lands Coordinates 39.9998°, -105.264094° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.9998,"lon":-105.264094,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

387

Western Geothermal Partners | Open Energy Information  

Open Energy Info (EERE)

Western Geothermal Partners Western Geothermal Partners Place Reno, Nevada Zip 89509 Sector Geothermal energy Product A Reno-based geothermal development company Coordinates 32.944065°, -97.578279° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.944065,"lon":-97.578279,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

388

NorthWestern Energy | Open Energy Information  

Open Energy Info (EERE)

NorthWestern Energy NorthWestern Energy Place South Dakota Utility Id 13809 Utility Location Yes Ownership I NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COPS-70 (Controlled Off Peak Service) Commercial LGS-34 Commercial RS-10 Residential Rate 25 All-Inclusive Commercial Service Commercial Average Rates

389

Western Governors' Association | Open Energy Information  

Open Energy Info (EERE)

Governors' Association Governors' Association Jump to: navigation, search Logo: Western Governors' Association Name Western Governors' Association Address 1600 Broadway, Suite 1700 Place Denver, CO Zip 80202 Year founded 1984 Phone number (303) 623-9378 Website http://www.westgov.org/ Coordinates 39.7420789°, -104.987377° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7420789,"lon":-104.987377,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

390

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 25, 2012 July 25, 2012 CX-008787: Categorical Exclusion Determination Midway Substation 230 Kilovolt Upgrades El Paso County, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region July 23, 2012 CX-008784: Categorical Exclusion Determination License Outgrant to Owl Creek Water District Town of Thermopolis, Hot Springs County, Wyoming CX(s) Applied: B4.9 Date: 07/23/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region July 3, 2012 CX-008779: Categorical Exclusion Determination Curecanti-Poncha-Canon City West-Midway 230-Kilovolt Transmission Line Road Maintenance Gunnison, Chaffee, Fremont, Pueblo, and El Paso Counties, Colorado CX(s) Applied: B1.3

391

An Estimate of Residential Energy Savings From IECC Change Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

An Estimate of Residential Energy Savings From IECC Change Proposals An Estimate of Residential Energy Savings From IECC Change Proposals Recommended for Approval at the ICC's Fall, 2009, Initial Action Hearings The U.S. Department of Energy (DOE) has established ambitious goals to improve the energy efficiency requirements of the International Energy Conservation Code (IECC) for residential buildings. DOE has established near- and long-term goals of 30% and 50% energy efficiency improvements, respectively, compared to the 2006 IECC. This report presents DOE's approach to calculating residential energy consumption for the purpose of estimating energy savings attributable to improvements in the code. This approach is then used to estimate the national average energy savings, relative to the 2006 IECC, resulting from the proposed improvements DOE submitted and supported for the 2012 IECC.

392

Notice of proposed rulemaking, Energy Efficiency and Sustainable Design  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

proposed rulemaking, Energy Efficiency and Sustainable proposed rulemaking, Energy Efficiency and Sustainable Design Standards for New Federal Buildings, 75 Fed. Reg. 29,933 (May 28, 2010) Notice of proposed rulemaking, Energy Efficiency and Sustainable Design Standards for New Federal Buildings, 75 Fed. Reg. 29,933 (May 28, 2010) Earthjustice respectfully submits the following comments on behalf of Natural Resources Defense Council, the Sierra Club, the D.C. Environmental Network, and Public Citizen. For the benefit of their members and the public, each of these organizations shares a common interest in ensuring that each agency in the Federal government takes prompt action to advance energy efficiency and reduce both its local environmental footprint and its contribution to global warming. Department of Energy ("DOE")

393

Impacts on irrigated agriculture of changes in electricity costs resulting from Western Area Power Administration`s power marketing alternatives  

DOE Green Energy (OSTI)

Irrigation is a major factor in the growth of US agricultural productivity, especially in western states, which account for more than 85% of the nation`s irrigated acreage. In some of these states, almost all cropland is irrigated, and nearly 50% of the irrigation is done with electrically powered pumps. Therefore, even small increases in the cost of electricity could have a disproportionate impact on irrigated agriculture. This technical memorandum examines the impacts that could result from proposed changes in the power marketing programs of the Western Area Power Administration`s Salt Lake City Area Office. The changes could increase the cost of power to all Western customers, including rural municipalities and irrigation districts that rely on inexpensive federal power to pump water. The impacts are assessed by translating changes in Western`s wholesale power rate into changes in the cost of pumping water as an input for agricultural production. Farmers can adapt to higher electricity prices in many ways, such as (1) using different pumping fuels, (2) adding workers and increasing management to irrigate more efficiently, and (3) growing more drought-tolerant crops. This study projects several responses, including using less groundwater and planting fewer waterintensive crops. The study finds that when dependence on Western`s power is high, the cost of power can have a major effect on energy use, agricultural practices, and the distribution of planted acreage. The biggest percentage changes in farm income would occur (1) in Nevada and Utah (however, all projected changes are less than 2% of the baseline) and (2) under the marketing alternatives that represent the lowest capacity and energy offer considered in Western`s Electric Power Marketing Environmental Impact Statement. The aggregate impact on farm incomes and the value of total farm production would be much smaller than that suggested by the changes in water use and planted acreage.

Edwards, B.K.; Flaim, S.J.; Howitt, R.E. [Argonne National Lab., IL (United States); Palmer, S.C. [Western Area Power Administration, Salt Lake City, UT (United States)

1995-03-01T23:59:59.000Z

394

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado River Storage Project Management Center Categorical Exclusion Determinations: Western Area Power Administration-Colorado River Storage Project Management Center...

395

Geothermal overviews of the western United States  

DOE Green Energy (OSTI)

This compendium presents data on geothermal resources for all those western states with geothermal potential. Individual sections, which have been processed separately for inclusion in the EDB data base, are devoted to each of the following states: Arizona, California, Colorado, Hawaii, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. A separate section is also devoted to the U.S. Bureau of Reclamation Imperial Valley Project. Maps and references are included for each section. (JGB)

Anderson, D.N.; Axtell, L.H. (comps.)

1972-01-01T23:59:59.000Z

396

Mass Wasting in the Western Galapagos Islands  

E-Print Network (OSTI)

Oceanic island volcanoes such as those in the Hawaiian, Canary and Galapagos Islands are known to become unstable, causing failures of the subaerial and submarine slopes of the volcanic edifices. These mass wasting events appear to be the primary source of destruction and loss of volume of many oceanic islands, but our knowledge of mass wasting is still rudimentary in many seamount and island chains. To better understand mass wasting in the western Galapagos Islands, multi-beam bathymetry and backscatter sidescan sonar images were used to examine topography and acoustic backscatter signatures that are characteristic of mass wasting. Observations show that mass wasting plays an important role in the development of Galapagos volcanoes. While volcanic activity continues to conceal the submarine terrain, the data show that four forms of mass wasting are identified including debris flows, slumps sheets, chaotic slumps, and detached blocks. A total of 23 mass wasting features were found to exist in the western Galapagos Islands, including fourteen debris flows with one that incorporated a set of detached blocks, seven slump sheets, and one chaotic slump. Some of the indentified features have obvious origination zones while the sources of others are not clearly identifiable. Approximately 73 percent of the surveyed coastlines are affected by slumping on the steep upper slopes and ~64 percent are affected by debris flows on the lower slopes. Unlike the giant landslides documented by GLORIA imagery around the Hawaiian Islands, the western Galapagos Islands appear to be characterized by small slump sheets existing along the steep shallow submarine flanks of the island and by debris flows that are flanked by rift zones and extend off the platform. This study indicates that submarine mass wasting is widespread in the western Galapagos, suggesting that the production of small-scale downslope movement is part of the erosive nature of these oceanic volcanic islands.

Hall, Hillary

2011-08-01T23:59:59.000Z

397

FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM:  

Office of Legacy Management (LM)

FINDING OF MD SIGNIFICANT IMPACT FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM: BAY0 CANYONS, NEW MEXICO Under the Formerly Utilized Sites Remedial Action Program (FUSRAP), the U.S. Department of Energy (DOE) has proposed to carry out rcmedfrl action at a site located in Bayo Canyon, Los Alamos County, New Mexico. Although the site as partially decontaminated and decommissioned in the 196Os, there remain above-background amounts of radionuclides. DOE has determined that strontium-90 in excess of DDE's proposed remedial- action criterir exists in subsurface materials underlying an area of about 0.6 ha (1.5 acres) at the Bayo Canyon site. The proposed action is to demarcate this are8 and restrict its use to activities that will not disturb this sub-

398

EIS-0425: Record of Decision and Mitigation Action Plan | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

5: Record of Decision and Mitigation Action Plan 5: Record of Decision and Mitigation Action Plan EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental Impact Statement (EIS) (DOE/EIS-0425, March 2012). BPA will fund the construction, operation, and maintenance of a coho slamon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action will involve building a new, small, in-basin adult

399

Water for western energy development update 1977  

DOE Green Energy (OSTI)

This report contains projections of steam-electric plants and other energy production developments in the west to 1990 and presents findings in regard to their estimated water requirements. Important institutional considerations and water conservation opportunities relating to western energy development also are examined. National load growth is expected to be between 3 and 5% per year and is expected to reach a total demand of 170 quads by the year 2000. Western energy consumption will total about 25 quads over the same period, about half of which will be electrical energy. By 1990, oil-shale processing may be barely started, geothermal development will be small, and only two coal gasification facilities are planned. Five coal slurry pipelines are planned with a total water requirement of 46,000 AcFt/yr to transport 59 million tons per year. Firm plans exist among Western utilities to construct 85 additional large steam-electric generating units in 46 locations, with an aggregate capacity of 46,189 MW. Total water requirements for the various technologies are reviewed and the impact of energy conservation measures is forecast. (MCW)

Not Available

1977-09-01T23:59:59.000Z

400

ATF2 Proposal Volume 2  

Science Conference Proceedings (OSTI)

For achieving the high luminosity required at the International Linear Collider (ILC), it is critical to focus the beams to nanometer size with the ILC Beam Delivery System (BDS), and to maintain the beam collision with a nanometer-scale stability. To establish the technologies associated with this ultra-high precision beam handling, it has been proposed to implement an ILC-like final focus optics in an extension of the existing extraction beamline of ATF at KEK. The ATF is considered to be the best platform for this exercise, since it provides an adequate ultra-low emittance electron beam in a manner dedicated to the development of ILC. The two major goals for this facility, called ATF2, are: (A) Achievement of a 37 nm beam size, and (B) control of beam position down to 2 nm level. The scientific justification for the ATF2 project and its technical design have been described in Volume 1 of the ATF2 Proposal [1]. We present here Volume 2 of the ATF2 Proposal, in which we present specifics of the construction plans and the group organization to execute the research programs at ATF2. The sections in this report have been authored by relevant ATF2 subgroups within the International ATF Collaboration. The time line of the project is described in Section 2. Section 3 discuss the structure of the international collaboration. Sections 4 and 5 discuss budget considerations, which are presented as well as the design and construction tasks to be shared by the international collaboration at ATF2. Concluding remarks have been contributed by Dr. Ewan Paterson, Chair of the International Collaboration Board of the ATF collaboration.

Grishanov, B.I.; Logachev, P.; Podgorny, F.; Telnov, V.; /Novosibirsk, IYF; Angal-Kalinin, D.; Jones, J.; Kalinin, A.; /Daresbury; Napoly, O.; Payet, J.; /DAPNIA, Saclay; Braun, H.H.; Schulte, D.; Zimmermann, F.; /CERN; Appleby, R.; Barlow, R.; Bailey, I.; Jenner, L.; Jones, R.; Kourevlev, G.; /Cockcroft Inst.; Elsen, E.; Vogel, V.; Walker, N.; /DESY /Fermilab /Hiroshima U. /Beijing, Inst. High Energy Phys. /Oxford U. /Royal Holloway, U. of London /KEK, Tsukuba /Kyoto U., Inst. Chem. Res. /Orsay, LAL /Valencia U. /Annecy, LAPP /LBL, Berkeley /LLNL, Livermore /University Coll. London /Chiba, Natl. Inst. Rad. Sci. /North Carolina A-T State U. /Oregon U. /Pohang Accelerator Lab. /Queen Mary, U. of London /SLAC /Tokyo U.

2006-02-27T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Restructuring proposed for Mexico's Pemex  

SciTech Connect

Mexican President Carlos Salinas de Gortari soon will send a legislative proposal to Congress that splits state owned Petroleos Mexicanos into four subsidiaries. This paper reports that Pemex functions will be divided into Pemex Exploration Production, Pemex Refining, Pemex Gas Basic Petrochemicals, and Pemex Secondary Chemicals. An earlier report the the company would be split into seven units. Each of the four new operating companies will be an independent business unit with a separate board of directors and its own staff and support functions.

Not Available

1992-06-22T23:59:59.000Z

402

Temporal and spatial stability of Anopheles gambiae larval habitat distribution in western Kenya highlands  

E-Print Network (OSTI)

distribution in Western Kenya highlands Li Li* 1 , Ling Biandata collected in western Kenya highlands during both drylarval habitats in western Kenya. The precipitation data of

Li, Li; Bian, Ling; Yakob, Laith; Zhou, Guofa; Yan, Guiyun

2009-01-01T23:59:59.000Z

403

Environmental Assessment and (FONSI) Of The Proposed 7-GeV Advanced Photon Source  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and (FONSI) OF THE PROPOSED and (FONSI) OF THE PROPOSED 7-GeV ADVANCED PHOTON SOURCE Table of Contents LIST OF ABBREVIATIONS AND ACRONYMS ABSTRACT 1.0 INTRODUCTION 1.1 PURPOSE 1.2 THE APS PROJECT AT ANL 1.3 SUMMARY OF THE PROPOSED ACTION 1.4 NEED FOR ACTION 2.0 THE PROPOSED ACTION AND ALTERNATIVES 2.1 DESCRIPTION OF APS AND CONSTRUCTION ACTIVITIES (PROPOSED ACTION) 2.1.1 APS Facility Description 2.1.2 Utility Services 2.1.3 Gaseous Emissions, Liquid Effluents, and Wastes 2.1.4 Construction Activities 2.1.5 Decommissioning 2.2 ALTERNATIVES 2.2.1 No Action 2.2.2 Construction at Another ANL Site 3.0 THE AFFECTED ENVIRONMENT 3.1 SITE DESCRIPTION 3.2 CLIMATOLOGY AND AIR QUALITY 3.2.1 Climatology 3.2.2 Air Quality 3.3 DEMOGRAPHY AND SOCIOECONOMIC PROFILE 3.4 LAND USE 3.4.1 Site and Vicinity

404

Action Item Review and Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

405

Graphical Framework for Action Recognition using Temporally Dense STIPs Pradeep Natarajan  

E-Print Network (OSTI)

Graphical Framework for Action Recognition using Temporally Dense STIPs Pradeep Natarajan BBN and recognize a se- quence of actions. More recently, Spatio-temporal Interest Points (STIPs) have been proposed hand, Bag-of-words approaches using Spatio- temporal Interest Points (STIP) as the basic features

Southern California, University of

406

RTG resource book for western states and provinces: Final proceedings  

SciTech Connect

The Western Interstate Energy Board held a workshop and liaison activities among western states, provinces, and utilities on the formation of Regional Transmission Groups (RTGs). Purpose of the activities was to examine the policy implications for western states and provinces in the formation of RTGs in the West, the implications for western ratepayers and utilities of the RTG formation and potential impacts of RTGs on the western electricity system. The workshop contributed to fulfilling the transmission access and competition objectives of Title VII of the Energy Policy Act of 1992.

NONE

1994-12-31T23:59:59.000Z

407

Western Interstate Nuclear Compact State Nuclear Policy (Multiple States) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Interstate Nuclear Compact State Nuclear Policy (Multiple Western Interstate Nuclear Compact State Nuclear Policy (Multiple States) Western Interstate Nuclear Compact State Nuclear Policy (Multiple States) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Arizona Program Type Siting and Permitting Provider Western Interstate Energy Board Legislation authorizes states' entrance into the Western Interstate Nuclear Compact, which aims to undertake the cooperation of participating states in

408

MIDDLE PARK Conservation Action Plan  

E-Print Network (OSTI)

MIDDLE PARK Conservation Action Plan 2011 Update Plant Species of Focus: Kremmling milkvetch Conservation Initiative Workshop dates: June 26, 2008 and July 6, 2010 Report date: August 25, 2011 Middle Park................................................................................................................... 6 A. Conservation Targets

409

Climate Action Plan (New Hampshire)  

Energy.gov (U.S. Department of Energy (DOE))

29 members of Governor John Lynchs Climate Change Policy Task Force developed a Climate Action Plan in 2009. It is aimed at achieving the greatest feasible reductions in greenhouse gas emissions...

410

Climate Action Plan (New Orleans)  

Energy.gov (U.S. Department of Energy (DOE))

New Orleans' Climate Action Plan will provide a road map to reach the City's greenhouse gas (GHG) reduction goal by 2030 while orchestrating its adaptation to climate change. The CAP will outline...

411

POST-REMEDIAL ACTION REPORT  

Office of Legacy Management (LM)

. . . . . . . . . . 3-1 Decontamination Techniques Used at the C. H. Schnoor Site, 12 3-2 Costs of theRemedia1 Action i t the C. H. Schnoor Site . . . . . . . . . . . 18 . . . . ....

412

ICDF Complex Remedial Action Report  

SciTech Connect

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

413

Recommendations on Alternative Actions for Analysis in Site-wide NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations on Alternative Actions for Analysis in Site-wide Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews The purpose o f this memorandum is t o recommend the treatment of the proposed action and the no action alternatives in site-wide National Environmental Pol icy Act (NEPA) reviews that are prepared for continuing and reasonably foreseeable future actions at Department o f Energy (DOE) sites. DOE prepares site-wide NEPA reviews in accordance with section 1021.331 o f the DOE NEPA Regulations (10 CFR Part 1021, published on April 24, 1992 at 57 F R 15122) to improve and coordinate agency plans, functions, programs, and resource utilization, among other reasons. Recommendations on Alternative Actions for Analysis in Site-wide NEPA

414

Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Propane Vehicle Propane Vehicle Rebates - Western Propane Gas Association (WPGA) to someone by E-mail Share Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Facebook Tweet about Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Twitter Bookmark Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Google Bookmark Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Delicious Rank Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Digg Find More places to share Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on AddThis.com...

415

Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe  

NLE Websites -- All DOE Office Websites (Extended Search)

2: November 5, 2: November 5, 2012 Western Europe Plug-in Car Sales, 2012 to someone by E-mail Share Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Facebook Tweet about Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Twitter Bookmark Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Google Bookmark Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Delicious Rank Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Digg Find More places to share Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on AddThis.com...

416

Regional economic impacts of changes in electricity rates resulting from Western Area Power Administration`s power marketing alternatives  

SciTech Connect

This technical memorandum describes an analysis of regional economic impacts resulting from changes in retail electricity rates due to six power marketing programs proposed by Western Area Power Administration (Western). Regional economic impacts of changes in rates are estimated in terms of five key regional economic variables: population, gross regional product, disposable income, employment, and household income. The REMI (Regional Impact Models, Inc.) and IMPLAN (Impact Analysis for Planning) models simulate economic impacts in nine subregions in the area in which Western power is sold for the years 1993, 2000, and 2008. Estimates show that impacts on aggregate economic activity in any of the subregions or years would be minimal for three reasons. First, the utilities that buy power from Western sell only a relatively small proportion of the total electricity sold in any of the subregions. Second, reliance of Western customers on Western power is fairly low in each subregion. Finally, electricity is not a significant input cost for any industry or for households in any subregion.

Allison, T.; Griffes, P.; Edwards, B.K.

1995-03-01T23:59:59.000Z

417

Western Resource Adequacy: Challenges - Approaches - Metrics...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plans in the West: Resource Strategies for a "Hybrid" Market Demand Response National Trends: Implications for the West? Proposed Energy Transport Corridors: West-wide energy...

418

2014 Joint Action Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014 Joint Action Workshop 2014 Joint Action Workshop January 12, 2014 8:00AM EST to January 14, 2014 5:00PM EST Palm Desert, California The Joint Action Workshop is an annual...

419

Western gas sands: Technology status report  

Science Conference Proceedings (OSTI)

Research on western gas sands is conducted by the US Department of Energy's Morgantown Technology Center to encourage the development of very low permeability gas sands in the western United States. The current search is an outgrowth of earlier Government research on tight sands in which nuclear and massive hydraulics fracturing stimulations were tested without definitive results. Based on input from the gas industry, universities, and geologic and engineering consulting firms, activites were broadened to include fundamental research and development. Consequently, the focus of the research for the last several years has been on improving diagnostic instruments for evaluating reservoir and stimulation performances, interpreting geophysical and engineering data, and stimulation techniques. Intergrated geologic studies of three depositional basins that contain tight lenticular sandstone units have also been pursued as part of this new effort. To date, the following tentative conclusions have been formulated: The permeability of the tight gas sands can be as much as three to four orders of magnitude lower than that of conventional gas deposits. Nineteen western geologic basins and trends have been identified that contain significant volumes of tight gas. Gas resources in the priority geologic basins have been estimated as follows: Piceance Basin, 420 Tcf.; Greater Green River Basin, 4971 Tcf.; and Uinta Basin, 21 Tcf. The critical parameters for successfully developing tight sandstone resources are the presence of natural fractures within a reservoir and the effective propped length of hydraulically induced fractures. Stimulation technology is presently insufficient to efficiently recover gas from lenticular, tight reservoirs. 15 refs., 14 figs., 3 tabs.

Not Available

1988-01-01T23:59:59.000Z

420

Western Wind and Solar Integration Study  

SciTech Connect

The Western Wind and Solar Integration Study (WWSIS) is one of the largest regional wind and solar integration studies to date. It was initiated in 2007 to examine the operational impact of up to 35% energy penetration of wind, photovoltaics (PV), and concentrating solar power (CSP) on the power system operated by the WestConnect group of utilities in Arizona, Colorado, Nevada, New Mexico, and Wyoming (see study area map). WestConnect also includes utilities in California, but these were not included because California had already completed a renewable energy integration study for the state. This study was set up to answer questions that utilities, public utilities commissions, developers, and regional planning organizations had about renewable energy use in the west: (1) Does geographic diversity of renewable energy resource help mitigate variability; (2) How do local resources compare to out-of-state resources; (3) Can balancing area cooperation help mitigate variability; (4) What is the role and value of energy storage; (5) Should reserve requirements be modified; (6) What is the benefit of forecasting; and (7) How can hydropower help with integration of renewables? The Western Wind and Solar Integration Study is sponsored by the U.S. Department of Energy (DOE) and run by NREL with WestConnect as a partner organization. The study follows DOE's 20% Wind Energy by 2030 report, which did not find any technical barriers to reaching 20% wind energy in the continental United States by 2030. This study and its partner study, the Eastern Wind Integration and Transmission Study, performed a more in-depth operating impact analysis to see if 20% wind energy was feasible from an operational level. In DOE/NREL's analysis, the 20% wind energy target required 25% wind energy in the western interconnection; therefore, this study considered 20% and 30% wind energy to bracket the DOE analysis. Additionally, since solar is rapidly growing in the west, 5% solar was also considered in this study. The goal of the Western Wind and Solar Integration Study is to understand the costs and operating impacts due to the variability and uncertainty of wind, PV, and CSP on the grid. This is mainly an operations study, (rather than a transmission study), although different scenarios model different transmission build-outs to deliver power. Using a detailed power system production simulation model, the study identifies operational impacts and challenges of wind energy penetration up to 30% of annual electricity consumption.

Lew, D.; Piwko, R.; Jordan, G.; Miller, N.; Clark, K.; Freeman, L.; Milligan, M.

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EA-1704: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi

422

Proposed Agency Information Collection: Federal Register Notice...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 154 - Aug. 10, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No....

423

ORNL Neutron Sciences User Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review & Ratings Process Beam time at HFIR and SNS is made available to the international scientific community through the General User Program (GUP). Proposals from...

424

2013 INCITE Proposals due June 27  

NLE Websites -- All DOE Office Websites (Extended Search)

INCITE Proposals 2013 INCITE Proposals due June 27 June 15, 2012 by Francesca Verdier (0 Comments) The Innovative and Novel Computational Impact on Theory and Experiment (INCITE)...

425

Department of Energy Proposed Agency Information Collection:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy Proposed Agency Information Collection: Federal Register Notice Volume 75, No. 100 - May 25, 2010 Department of Energy Proposed Agency Information Collection. The...

426

Department of Energy Proposed Agency Information Collection:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy Proposed Agency Information Collection: Federal Register Notice Volume 75, No. 140 - Jul. 22, 2010 Department of Energy proposed Agency Information Collection:...

427

Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1997--June 1997  

SciTech Connect

This compilation summarizes significant enforcement actions that have been resolved during the period (January - June 1997) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

NONE

1997-09-01T23:59:59.000Z

428

Proposal to study stem forgings  

SciTech Connect

Reservoir designs consist of two primary features including the stem(s) and the body segment. The stem is either an integral part of the reservoir or is joined at some point in the fabrication sequence. The current interest is in high strength stems for advanced reservoir designs. The processing necessary to achieve these strength levels may result in heavily cold worked microstructures which may not interface well with the stem requirements. For instance, cold worked 316 plate stock has shown decreased hydrogen compatibility when contrasted to the annealed version in laboratory tests. More recently, Precision Forge produced a 100 ksi yield strength, 304L stem forging with a heavily deformed microstructure which also may show decreased compatibility in hydrogen. The proposed forging contract will evaluate the influence of forging parameters on the microstructure and mechanical properties of 304L and 316 stem forgings. A summary of the data available on 304L stem forgings is shown graphically. The yield strength values are shown for each set of forging parameters. Tensile tests and microstructural examination will be conducted to complete the information for 304L and create a similar graph for 316 stem forgings.

Odegard, B.C.

1982-06-25T23:59:59.000Z

429

EA-1055; Environmental Assessment and (FONSI) for The Proposed Center for Advanced Industrial Processes Washington State University College of Engineering and Architecture  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55; Environmental Assessment and (FONSI) for The Proposed 55; Environmental Assessment and (FONSI) for The Proposed Center for Advanced Industrial Processes Washington State University College of Engineering and Architecture Table of Contents ABBREVIATIONS AND ACRONYMS 1. DOCUMENT SUMMARY 2. PURPOSE AND NEED FOR AGENCY ACTION 3. DESCRIPTION OF ALTERNATIVES INCLUDING THE PROPOSED ACTION 3.1 Description of the Proposed Action 3.2 Project Description 3.2.1 Construction Activities 3.2.2 Operation Activities 3.3 No Action Alternative 4. THE AFFECTED ENVIRONMENT 4.1 Site Description 4.2 Air Quality 4.3 Surface/Ground Water Quality 4.4 Soil 4.5 Sensitive Resources 5. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION 5.1 Construction Impacts 5.1.1 Sensitive Resources 5.1.2 Erosion/Run-Off 5.1.3 Demolition/Construction Waste Disposal 5.1.3.1 Conventional Wastes

430

Worldwide Energy Efficiency Action through Capacity Building...  

Open Energy Info (EERE)

Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and...

431

Action Codes Table | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Safeguards System Action Codes Table Action codes *U.S.: **IAEA: A - Shipper's original data A B - Receiver's data accepting shipper's weights without measurement W C - Shipper's...

432

SEAB Climate Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy. Climate Action Plan (pdf) More Documents...

433

DOE Announces Additional Energy Efficiency Enforcement Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Additional Energy Efficiency Enforcement Action to Protect Consumers DOE Announces Additional Energy Efficiency Enforcement Action to Protect Consumers January 7, 2010 - 12:00am...

434

Renewable Energy Action Project | Open Energy Information  

Open Energy Info (EERE)

Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon Renewable Energy Action Project Jump to: navigation, search Name Renewable Energy Action...

435

Proposal Submittal and Scheduling Procedures for Macromolecular  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Macromolecular Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal Forms New Proposal Request Form (note: you must be a registered user to submit a proposal through our User Portal. Click on "Become a New User" link to register.) Extension Application for Macromolecular Crystallography Proposals Rapid Access Application Form Types of Proposals Proposals should be submitted under one of the following classifications.

436

JGI - How to Propose a CSP Project  

NLE Websites -- All DOE Office Websites (Extended Search)

How to Propose a CSP Project How to Propose a CSP Project CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ How do I submit my proposal? Proposals for synthetic biology and small-scale microbial and metagenome projects may be submitted at any time as brief white papers and will be reviewed every six months. Deadline for submission is 60 days prior to the review. See proposal schedule for specific dates. Submit a small-scale microbial/metagenome or synthetic biology proposal For the CSP15 annual call, a letter of intent is required to submit a proposal to JGI. Submitters whose letters of intent/proposals are approved will receive further instructions via email. Submit a CSP annual proposal For the CSP15 JGI-EMSL joint call, a letter of intent is required to submit

437

Enforcement Action EA 98-12  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 1998 6, 1998 Mr. Peyton S. Baker [ ] Babcock & Wilcox of Ohio, Inc. 1 Mound Road Miamisburg, Ohio 45343-3030 EA 98-12 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty - $165,000 (NTS-OH-MB-BWO-BWO04-1998-0001, NTS-OH-MB-BWO-BWO04-1998-0002, and NTS-OH-MB-BWO-BWO06-1998-0001) Dear Mr. Baker: This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning a number of significant deficiencies in Babcock & Wilcox of Ohio, Inc., (BWO) radiological work controls and bioassay program at the DOE Mound Site and its corrective actions to remedy those deficiencies. DOE initiated an investigation in March 1998 for the radiological work control deficiencies

438

Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

none,

1987-06-01T23:59:59.000Z

439

Practical Action | Open Energy Information  

Open Energy Info (EERE)

Action Action Jump to: navigation, search Logo: Practical Action Name Practical Action Address The Schumacher Centre for Technology & Development, Bourton on Dunsmore, Rugby, Warwickshire Place Rugby, Warwickshire Zip CV21 1UB Phone number 01926 634400 Notes Practical Action works alongside communities to find practical solutions to the poverty they face. Website http://www.practicalaction.org Coordinates 52.3910875°, -1.2339112° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.3910875,"lon":-1.2339112,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

440

An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells  

Science Conference Proceedings (OSTI)

This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells.

Not Available

1990-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Interconnection of the Proposed Hermosa West Wind Farm 8: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY SUMMARY This EIS will evaluate the environmental impacts of interconnecting the proposed 300-megawatt Hermosa West Wind Farm Project, in Albany County, Wyoming, with DOE's Western Area Power Administration's existing Craig-Ault 345-kilovolt transmission line. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 5, 2012 EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY January 14, 2010 EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings

442

Definition: Corrective Action Plan | Open Energy Information  

Open Energy Info (EERE)

Corrective Action Plan Corrective Action Plan Jump to: navigation, search Dictionary.png Corrective Action Plan A list of actions and an associated timetable for implementation to remedy a specific problem.[1] View on Wikipedia Wikipedia Definition Corrective action and preventive action (CAPA, also called corrective action / preventive action) are improvements to an organization's processes taken to eliminate causes of non-conformities or other undesirable situations. CAPA is a concept within good manufacturing practice (GMP). It focuses on the systematic investigation of the root causes of non-conformities in an attempt to prevent their recurrence (for corrective action) or to prevent occurrence (for preventive action). Corrective actions are implemented in response to customer complaints,

443

CELS Diversity & Inclusion Action Plan | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

CELS Diversity & Inclusion Action Plan Computing, Environment & Life Sciences Diversity & Inclusion Action Plan CELS Diversity & Inclusion Action Plan...

444

PSE Diversity & Inclusion Action Plan | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

PSE Diversity & Inclusion Action Plan Physical Sciences & Engineering Diversity & Inclusion Action Plan PSE Diversity & Inclusion Action Plan...

445

EESA Diversity & Inclusion Action Plan | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

EESA Diversity & Inclusion Action Plan Energy Engineering & Systems Analysis Diversity & Inclusion Action Plan EESA Diversity & Inclusion Action Plan...

446

http://www.oha.doe.gov/regs/Proposed708.htm  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

[6450.01P] [6450.01P] DEPARTMENT OF ENERGY 10 CFR PART 708 [RIN 1901-AA78] Criteria and Procedures for DOE Contractor Employee Protection Program AGENCY: Department of Energy ACTION: Notice of proposed rulemaking SUMMARY: The Department of Energy (DOE) proposes amendments for its contractor employee protection program which provides recourse to DOE contractor employees who believe they have been retaliated against for activities such as a disclosure of information regarding management of environmental, safety, health, and other matters, for participating in Congressional proceedings, or for refusing to engage in illegal or dangerous activities. DATES: Written comments should be forwarded not later than ____________ [insert the date 60 days from date of this FR

447

Proposed Multi-step DOE NIETC Designation Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DOE Technical Conference - Mike Heyeck - AEP VP, Transmission 1 Proposed Multi-Step DOE NIETC Designation Process Proposed Multi-Step DOE NIETC Designation Process 1) DOE designates NIETCs that exhibit significant congestion and reliability problems in studies or per request and delegates to FERC siting process for action according to statute. 2) RTOs, ISOs or individual TOs determine the optimal solution to alleviate the problems identified above. 3) DOE designates NIETCs if transmission solutions are found that are not designated NIETCs per step 1. 4) State and local agencies fully engage with transmission developers on siting requirements including environmental impact studies. DOE delegates its lead agency role to FERC for federal lands and areas not covered by state and local siting requirements.

448

Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: Determine whether COCs are present. If COCs are present, determine their nature and extent. Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is recommended for the remaining 10 CASs in CAU 562. A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.

Mark Krause

2010-08-01T23:59:59.000Z

449

ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED ENERGY CONSERVATION STANDARD FOR REFRIGERATORS, REFRIGERATOR-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ASSESSMENT FOR THE PROPOSED ENERGY ASSESSMENT FOR THE PROPOSED ENERGY CONSERVATION STANDARD FOR REFRIGERATORS, REFRIGERATOR- , AND FREEZERS - 1. INTRODUCTION AND NEED FOR PROPOSED ACTION ental Assessment (EA) on the candidate energy conservation stand licy Act. of 1969 (NEPA), regulations of the Council on Environmentd Qu refrigerators, re€iigerator-freezers, and freezers was prepared pursuant to the National ' ederal Regulations, Parts 1500 through. 1508. The proposed energy conservation standard (Level 1) and the alternative standards are being reviewed in an energy- efficiency standards rulemaking that the Department has undertaken pursuant to the Energy Policy and Conservation Act, as amended by the National Energy Conservation Policy Act and the National Appliance Energy Consehation Act

450

Remedial Action Contacts Directory - 1997  

SciTech Connect

This document, which was prepared for the US Department of Energy (DOE) Office of Environmental Restoration (ER), is a directory of 2628 individuals interested or involved in environmental restoration and/or remedial actions at radioactively contaminated sites. This directory contains a list of mailing addresses and phone numbers of DOE operations, area, site, project, and contractor offices; an index of DOE operations, area, site, project, and contractor office sorted by state; a list of individuals, presented by last name, facsimile number, and e-mail address; an index of affiliations presented alphabetically, with individual contacts appearing below each affiliation name; and an index of foreign contacta sorted by country and affiliation. This document was generated from the Remedial Action Contacts Database, which is maintained by the Remedial Action Program Information Center (RAPIC).

1997-05-01T23:59:59.000Z

451

DOE Takes Action to Stop the Sales of Air-Con Air Conditioner Models Shown  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Takes Action to Stop the Sales of Air-Con Air Conditioner Takes Action to Stop the Sales of Air-Con Air Conditioner Models Shown to Violate Federal Energy Efficiency Appliance Standards DOE Takes Action to Stop the Sales of Air-Con Air Conditioner Models Shown to Violate Federal Energy Efficiency Appliance Standards September 23, 2010 - 12:00am Addthis Washington, DC - The Department of Energy announced today that it has taken action against Air-Con, International, requiring the company to stop selling certain air conditioning systems in the U.S. that have been shown to violate minimum energy efficiency appliance standards. DOE is proposing a civil penalty of more than $230,000 for importing and distributing these inefficient cooling products. This action and the proposed penalties are part of the Department's continued commitment to act aggressively to remove

452

EIS-0186: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

186: Mitigation Action Plan 186: Mitigation Action Plan EIS-0186: Mitigation Action Plan Alaska Industrial Development and Export Authority Healy Clean Coal Project In response to a Program Opportunity Notice issued in May 1989 by the Department of Energy (DOE) for the third solicitation of the Clean Coal Technology (CCT) Program, the Alaska Industrial Development and Export Authority (AIDEA) conceived, designed, and proposed the Healy Clean Coal Project (HCCP). The HCCP, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide (SO2), oxides of nitrogen (NOx), and particulate matter (PM). The two technologies to be demonstrated are the TRW Applied Technologies Division entrained

453

Green Building Action Plan for State Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Action Plan for State Facilities Green Building Action Plan for State Facilities Green Building Action Plan for State Facilities < Back Eligibility State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Manufacturing Buying & Making Electricity Solar Lighting Windows, Doors, & Skylights Heating Water Water Heating Wind Program Info State California Program Type Energy Standards for Public Buildings Provider California Energy Commission '''''Note: California voters approved [http://vig.cdn.sos.ca.gov/2012/general/pdf/text-proposed-laws-v2.pdf#nam... Ballot Proposition 39] in November 2012. The new law closes a tax loophole, which is expected to provide $1 billion in additional revenue every year.

454

EIS-0186: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EIS-0186: Mitigation Action Plan Alaska Industrial Development and Export Authority Healy Clean Coal Project In response to a Program Opportunity Notice issued in May 1989 by the Department of Energy (DOE) for the third solicitation of the Clean Coal Technology (CCT) Program, the Alaska Industrial Development and Export Authority (AIDEA) conceived, designed, and proposed the Healy Clean Coal Project (HCCP). The HCCP, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide (SO2), oxides of nitrogen (NOx), and particulate matter (PM). The two technologies to be demonstrated are the TRW Applied Technologies Division entrained

455

Final voluntary release assessment/corrective action report  

SciTech Connect

The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

NONE

1996-11-12T23:59:59.000Z

456

Potential for heating western tree seedling greenhouses with geothermal energy  

DOE Green Energy (OSTI)

The technology to apply geothermal energy to greenhousing is available. Geothermal energy is compatible with greenhouse heat exchange hardware, and it is abundant in the western United States. Geothermal resources suitable for greenhousing are natural springs, deep hot water or steam wells, and waste water from electrical power generating plants. Factors influencing greenhouse heating needs include climate, elevation, structure, and growing regime, as well as the attributes of the geothermal energy source: heat, quantity, quality. Greenhouse sites should be evaluated for suitability, size, availability of labor supply, markets, etc. Problems exist in developing any new energy source, but a sound economic assessment based on good engineering and geological advice will illustrate advantages and problems. When considering geothermal energy as an alternative energy source these steps are recommended: (1) Determine the geographic region greenhouse will serve. (2) Tabulate known geothermal resources within region. (3) Rank potential locations in terms of geothermal fluid chemistry and location. (4) Obtain data on chemistry, flow potential, temperature, and probable lifespan of resources. (5) Conduct economic analysis of proposed greenhouse operation using these geothermal sources; compare with optimum fossil fuel economics and long term availability in the region. (6) Proceed with project if economically attractive.

McDonald, S.E.; Austin, C.F.; Lott, J.R.

1976-11-01T23:59:59.000Z

457

Potential for heating western tree seedling greenhouses with geothermal energy  

DOE Green Energy (OSTI)

Geothermal energy is compatible with greenhouse heat exchange hardware, and it is abundant in the western United States. Geothermal resources suitable for greenhousing are natural springs, deep hot water or steam wells, and waste water from electrical power generating plants. The wisest approach to using geothermal energy is to seek out and use known resources. Factors influencing greenhouse heating needs include climate, elevation, structure, and growing regime, as well as the attributes of the geothermal energy source: heat, quantity, quality. Greenhouse sites should be evaluated for suitability, size, availability of labor supply, markets, etc. A sound economic assessment based on good engineering and geological advice will illustrate advantages and problems. When considering geothermal energy as an alternative energy source these steps are recommended: (1) determine the geographic region greenhouse will serve; (2) tabulate known geothermal resources within region; (3) rank potential locations in terms of geothermal fluid chemistry and location; (4) obtain data on chemistry, flow potential, temperature, and probable lifespan of resources; (5) conduct economic analysis of proposed greenhouse operation using these geothermal sources; compare with optimum fossil fuel economics and long term availability in the region; (6) proceed with project if economically attractive.

McDonald, S.E.; Austin, C.F.; Lott, J.R.

1976-11-01T23:59:59.000Z

458

A Radiation Laboratory Curriculum Development at Western Kentucky University  

SciTech Connect

We present the latest developments for the radiation laboratory curriculum at the Department of Physics and Astronomy of Western Kentucky University. During the last decade, the Applied Physics Institute (API) at WKU accumulated various equipment for radiation experimentation. This includes various neutron sources (computer controlled d-t and d-d neutron generators, and isotopic 252 Cf and PuBe sources), the set of gamma sources with various intensities, gamma detectors with various energy resolutions (NaI, BGO, GSO, LaBr and HPGe) and the 2.5-MeV Van de Graaff particle accelerator. XRF and XRD apparatuses are also available for students and members at the API. This equipment is currently used in numerous scientific and teaching activities. Members of the API also developed a set of laboratory activities for undergraduate students taking classes from the physics curriculum (Nuclear Physics, Atomic Physics, and Radiation Biophysics). Our goal is to develop a set of radiation laboratories, which will strengthen the curriculum of physics, chemistry, geology, biology, and environmental science at WKU. The teaching and research activities are integrated into real-world projects and hands-on activities to engage students. The proposed experiments and their relevance to the modern status of physical science are discussed.

Barzilov, Alexander P.; Novikov, Ivan S.; Womble, Phil C. [Department of Physics and Astronomy, Western Kentucky University, 1906 College Heights Blvd, 11077, Bowling Green KY 42101 (United States)

2009-03-10T23:59:59.000Z

459

EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.)

460

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region June 5, 2012 CX-008778: Categorical Exclusion Determination Combined Crew Vegetation Management on...

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Utilities District of Western Indiana REMC - Residential Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- 400 Air-sourceDual Fuel Heat Pump: 300 - 400 Geothermal Heat Pump: 1,500 Central Air Conditioning: 200 - 300 Utilities District of Western Indiana REMC offers...

462

AEO2011: Renewable Energy Generation by Fuel - Western Electricity  

Open Energy Info (EERE)

AEO2011: Renewable Energy Generation by Fuel - Western Electricity Coordinating Council Northwest Power Pool Area This...

463

NorthWestern Energy (Electric) - Commercial Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebate Program NorthWestern Energy offers multiple rebate programs for commercial and industrial customers to make energy efficient improvements to their businesses. This...

464

Clean Cities: Western Riverside County Clean Cities coalition  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

vehicle fleets, fuel providers, community leaders, and other stakeholders to reduce petroleum use in transportation. Western Riverside County Clean Cities coalition Contact...

465

Energy Efficiency in Western Utility Resource Plans Implications...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Resource Plans Implications for Regional Assessments and Initiatives Energy Efficiency in Western Utility Resource Plans Implications for Regional Assessments and...

466

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Installation of Cattle Guard at Western Area power Administration's Oracle Electrical Substation CX(s) Applied: B1.11 Date: 05092013...

467

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mountain Region Categorical Exclusion Determinations issued by Western Area Power Administration-Rocky Mountain Region. DOCUMENTS AVAILABLE FOR DOWNLOAD June 20, 2013...

468

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Great Plains Region Categorical Exclusion Determinations issued by Western Area Power Administration-Upper Great Plains Region. DOCUMENTS AVAILABLE FOR DOWNLOAD March 22,...

469

AEO2011: Renewable Energy Generation by Fuel - Western Electricity  

Open Energy Info (EERE)

Western Electricity Coordinating Council California This dataset comes from the Energy Information Administration (EIA),...

470

Energy Department's Fossil Energy Chief to Tour Western Michigan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Fossil Energy Chief to Tour Western Michigan University's Clean Coal Research Facilities, Host Business Roundtable Energy Department's Fossil Energy Chief to Tour...

471

Alternative Operations Study Summary Western Area Power Administration...  

NLE Websites -- All DOE Office Websites (Extended Search)

ties. Historically, Western-UGP has had opportunities to sell and purchase short-term energy from many different entities in response to hydro-generation variability. However,...

472

Western Area Power Administration, Desert Southwest Region  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Western Area Power Administration, Desert Southwest Region Liberty-Parker #2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description The scope of work includes digging a trenching and burying a 1.25-inch OPGW conduit. The conduit trench will be about 4 feet deep and 10 inches wide, with warning tape placed above the conduit in the trench. Once the conduit has been placed, the trench will be backfilled with the original surface material. About 5.3 linear miles of trenching will be required, mostly within the existing dirt access road associated with the LIB-PAD #2 transmission line. Four pullboxes will be installed along the route. The pullboxes measure 2 feet by 3 feet by 2 feet and will be installed at least 24 inches below grade. An

473

Western Area Power Administration | Open Energy Information  

Open Energy Info (EERE)

Administration Administration Jump to: navigation, search Name Western Area Power Administration Place Colorado Utility Id 27000 Utility Location Yes Ownership F NERC Location WECC, MAPP NERC MRO Yes NERC SPP Yes NERC WECC Yes ISO CA Yes RTO SPP Yes ISO MISO Yes ISO Other Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Schedule R-8 Farm and Home Residential Average Rates Commercial: $0.0278/kWh

474

Western Ethanol Company LLC | Open Energy Information  

Open Energy Info (EERE)

Ethanol Company LLC Ethanol Company LLC Jump to: navigation, search Name Western Ethanol Company LLC Place Placentia, California Zip 92871 Product California-based fuel ethanol distribution and marketing company. Coordinates 33.871124°, -117.861401° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.871124,"lon":-117.861401,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

475

Western Massachusetts Elec Co | Open Energy Information  

Open Energy Info (EERE)

Co Co Jump to: navigation, search Name Western Massachusetts Elec Co Place Massachusetts Service Territory Massachusetts Green Button Landing Page www.wmeco.com/Residential Green Button Reference Page www.wmeco.com/Residential Green Button Implemented Yes Utility Id 20455 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes ISO NE Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile.

476

Western States Geothermal Company | Open Energy Information  

Open Energy Info (EERE)

States Geothermal Company States Geothermal Company Jump to: navigation, search Name Western States Geothermal Company Place Sparks, Nevada Zip 89432-2627 Sector Geothermal energy Product Geothermal power plant developer and operator. Acquired by Ormat in 2001. Coordinates 35.61145°, -96.821309° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.61145,"lon":-96.821309,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

477

Western's CRSP-MC web site  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact CRSP Customers Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Contact CRSP Customers Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Colorado River Storage Project Management Center service area map. The Colorado River Storage Project Management Center is Western Area Power Administration's one management center that reports to the Administrator. CRSP-MC markets power from the Colorado River Storage, Collbran and Rio Grande projects (marketed together as Salt Lake City Area Integrated Projects), the Provo River Project in Utah, and the Falcon/Amistad Project in Texas. Transmission service is provided on transmission facilities in Arizona, New Mexico, Colorado, Utah, Texas and Wyoming. Management Center highlights KAFB-SNL Prototype Power Purchase Contract added 4/26/2013

478

Western Area Power Administration, Desert Southwest Region  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration, Desert Southwest Region Liberty-Parker #2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description The scope of work includes digging a trenching and burying a 1.25-inch OPGW conduit. The conduit trench will be about 4 feet deep and 10 inches wide, with warning tape placed above the conduit in the trench. Once the conduit has been placed, the trench will be backfilled with the original surface material. About 5.3 linear miles of trenching will be required, mostly within the existing dirt access road associated with the LIB-PAD #2 transmission line. Four pullboxes will be installed along the route. The pullboxes measure 2 feet by 3 feet by 2 feet and will be installed at least 24 inches below grade. An

479

Shallow magma targets in the western US  

DOE Green Energy (OSTI)

Within the next few years a hole will be drilled into a shallow magma body in the western US for the purpose of evaluating the engineering feasibility of magma energy. This paper examines potential drilling sites for these engineering feasibility experiments. Target sites high on the list are ones that currently exhibit good geophysical and geological data for shallow magma and also have reasonable operational requirements. Top ranked sites for the first magma energy well are Long Valley, CA, and Coso/Indian Wells, CA. Kilauea, HI, also in the top group, is an attractive site for some limited field experiments. A number of additional sites offer promise as eventual magma energy sites, but sparsity of geophysical data presently prevents these sites from being considered for the first magma energy well.

Hardee, H.C.

1984-10-01T23:59:59.000Z

480

Western Energy Corridor -- Energy Resource Report  

Science Conference Proceedings (OSTI)

The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

Leslie Roberts; Michael Hagood

2011-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "action western proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Proposal Review Panel | Stanford Synchrotron Radiation Lightsource  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Proposal Review Panel Submitting a proposal is the first step to access beam time at SSRL. Proposals are peer reviewed and rated by the SSRL Proposal Review Panel (PRP) on a scale from 1 (highest) to 5 (lowest). Successful proposals are eligble to request and may be awarded beam time on SSRL beam lines, with priority given to the highest rated proposals and those which demonstrate efficient and productive use of beam time. We have three proposal calls per year with one on-site PRP meeting at SSRL annually. Access Policy The work of the PRP is accomplished with four subpanels: BIO - The biology panel reviews proposals requesting beam time for imaging, X-ray spectroscopic studies, small-angle scattering experiments, and crystallography of biologically important samples.

482

Operating Reserve Implication of Alternative Implementations of an Energy Imbalance Service on Wind Integration in the Western Interconnection: Preprint  

DOE Green Energy (OSTI)

During the past few years, there has been significant interest in alternative ways to manage power systems over a larger effective electrical footprint. Large regional transmission organizations in the Eastern Interconnection have effectively consolidated balancing areas, achieving significant economies of scale that result in a reduction in required reserves. Conversely, in the