Powered by Deep Web Technologies
Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

EA-1950: Finding of No Significant Impact and Mitigation Action...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EA-1950: Finding of No Significant Impact and Mitigation Action Plan Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington Bonneville Power...

2

Enforcement actions: Significant actions resolved; Quarterly progress report, October--December 1993: Volume 12, No. 4  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1994-03-01T23:59:59.000Z

3

EO 13211: Regulations That Significantly Affect Energy Supply, Distribution, or Use  

Broader source: Energy.gov (indexed) [DOE]

5 5 Federal Register / Vol. 66, No. 99 / Tuesday, May 22, 2001 / Presidential Documents Executive Order 13211 of May 18, 2001 Actions Concerning Regulations That Significantly Affect En- ergy Supply, Distribution, or Use By the authority vested in me as President by the Constitution and the laws of the United States of America, and in order to appropriately weigh and consider the effects of the Federal Government's regulations on the supply, distribution, and use of energy, it is hereby ordered as follows: Section 1. Policy. The Federal Government can significantly affect the supply, distribution, and use of energy. Yet there is often too little information regarding the effects that governmental regulatory action can have on energy. In order to provide more useful energy-related information and hence im-

4

E-Print Network 3.0 - actions significant actions Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

should begin work on its Action Team Plan. ... Source: Environmental Protection Agency, Technology Innovation Program (TIP) Collection: Multidisciplinary Databases and Resources...

5

Enforcement actions: Significant actions resolved, material licensees. Semiannual progress report, July--December 1997; Volume 16, Number 2, Part 3  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during the period (July--December 1997) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1998-04-01T23:59:59.000Z

6

Enforcement actions: Significant actions resolved reactor licensees. Volume 14, No. 2, Part 2, Quarterly progress report, April--June 1995  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1995-08-01T23:59:59.000Z

7

FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM:  

Office of Legacy Management (LM)

FINDING OF MD SIGNIFICANT IMPACT FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM: BAY0 CANYONS, NEW MEXICO Under the Formerly Utilized Sites Remedial Action Program (FUSRAP), the U.S. Department of Energy (DOE) has proposed to carry out rcmedfrl action at a site located in Bayo Canyon, Los Alamos County, New Mexico. Although the site as partially decontaminated and decommissioned in the 196Os, there remain above-background amounts of radionuclides. DOE has determined that strontium-90 in excess of DDE's proposed remedial- action criterir exists in subsurface materials underlying an area of about 0.6 ha (1.5 acres) at the Bayo Canyon site. The proposed action is to demarcate this are8 and restrict its use to activities that will not disturb this sub-

8

The Healthy Homes Initiative Housing conditions can significantly affect public health.  

E-Print Network [OSTI]

The Healthy Homes Initiative Housing conditions can significantly affect public health. Nationwide in the home, focusing narrowly on one issue, even in the presence of multiple issues. A Healthy Homes approach associated with unhealthy and unsafe homes. What Is CDC's Healthy Homes Initiative? CDC's Healthy Homes

9

Enforcement actions: Significant actions resolved, reactor licensees. Semiannual progress report, July--December 1995. Volume 14, Numbers 3 and 4, Part 2  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during the period (July--December 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1996-02-01T23:59:59.000Z

10

Enforcement actions: Significant actions resolved material licensees (non-medical). Volume 14, No. 1, Part 3, Quarterly progress report, January--March 1995  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to Material Licensees (non-Medical) with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1995-05-01T23:59:59.000Z

11

Enforcement actions: Significant actions resolved, material licensees. Semiannual progress report, July--December 1995: Volume 14, Numbers 3 and 4, Part 3  

SciTech Connect (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during the period (July--December 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1996-02-01T23:59:59.000Z

12

EA-0893: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Gazes Cardiac Institute, and the connected action involving the Strom Thurmond Biomedical Research Center, does not constitute a major Federal action significantly affecting...

13

Finding of No Significant Impact (FONSI)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation...

14

EA-0995: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

the EA, DOE has determined that the proposed construction of the Drum Storage Facility at Rocky Flats does not constitute a major Federal action significantly affecting the quality...

15

Sensitivity analysis of potential events affecting the double-shell tank system and fallback actions  

SciTech Connect (OSTI)

Sensitivity analyses were performed for fall-back positions (i.e., management actions) to accommodate potential off-normal and programmatic change events overlaid on the waste volume projections and their uncertainties. These sensitivity analyses allowed determining and ranking tank system high-risk parameters and fall- back positions that will accommodate the respective impacts. This quantification of tank system impacts shows periods where tank capacity is sensitive to certain variables that must be carefully managed and/or evaluated. Identifying these sensitive variables and quantifying their impact will allow decision makers to prepare fall-back positions and focus available resources on the highest impact parameters where technical data are needed to reduce waste projection uncertainties. For noncomplexed waste, the period of capacity vulnerability occurs during the years of single-shell tank (SST) retrieval (after approximately 2009) due to the sensitivity to several variables. Ranked by importance these variables include the pretreatment rate and 200-East SST solids transfer volume. For complexed waste, the period of capacity vulnerability occurs during the period after approximately 2005 due to the sensitivity to several variables. Ranked by importance these variables include the pretreatment rate. 200-East SST solids transfer volume. complexed waste reduction factor using evaporation, and 200-west saltwell liquid porosity.

Knutson, B.J.

1996-09-27T23:59:59.000Z

16

Monitoring Fish Contaminant Responses to Abatement Actions: Factors that Affect Recovery  

SciTech Connect (OSTI)

Monitoring of contaminant accumulation in fish has been conducted in East Fork Poplar Creek (EFPC) in Oak Ridge, Tennessee since 1985. Bioaccumulation trends are examined over a twenty year period coinciding with major pollution abatement actions by a Department of Energy facility at the stream s headwaters. Although EFPC is enriched in many contaminants relative to other local streams, only polychlorinated biphenyls (PCBs) and mercury (Hg) were found to accumulate in the edible portions of fish to levels of human health concern. Mercury concentrations in redbreast sunfish were found to vary with season of collection, sex and size of individual fish. Over the course of the monitoring, waterborne Hg concentrations were reduced[80%; however, this did not translate into a comparable decrease in Hg bioaccumulation at most sites. Mercury bioaccumulation in fish did respond to decreased inputs in the industrialized headwater reach, but paradoxically increased in the lowermost reach of EFPC. As a result, the downstream pattern of Hg concentration in fish changed from one resembling dilution of a headwater point source in the 1980s to a uniform distribution in the 2000s. The reason for this remains unknown, but is hypothesized to involve changes in the chemical form and reactivity of waterborne Hg associated with the removal of residual chlorine and the addition of suspended particulates to the streamflow. PCB concentrations in fish varied greatly from year-to-year, but always exhibited a pronounced downstream decrease, and appeared to respond to management practices that limited episodic inputs from legacy sources within the facility.

Southworth, George R [ORNL; Peterson, Mark J [ORNL; Roy, W Kelly [ORNL; Mathews, Teresa J [ORNL

2011-01-01T23:59:59.000Z

17

FINDING OF NO SIGNIFICANT IMPACT  

Broader source: Energy.gov (indexed) [DOE]

NO SIGNIFICANT IMPACT Wibursement of $65 Million by the U . S . Department of Energy to the State of T e x a s for Construction of a Regional Medical Technology Center at the Former Superconducting Super Collider Site, Waxahachie, Texas AGENCY: U.S. DEPARTMENT OF ENERGY ACTION FXNDING OF NO SIGNIFICANT IMPACT SUMMARY: The U.S. Department of Energy (DOE) has completed an environmental assessment @OE/EA-1090) of the proposed disbursement of $65 million to the State of Texas for construction of a Regional Medical Technology Center (RMTC) near Waxahachie, Texas. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment

18

Finding of no significant impact for the interim action for cleanup of Pit 9 at the Radioactive Waste Management Complex, Idaho National Engineering Laboratory  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0854, for an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The proposed action would be conducted at Pit 9, Operable Unit 7--10, located at the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). The proposed action consists of construction of retrieval and processing buildings, excavation and retrieval of wastes from Pit 9, selective physical separation and chemical extraction, and stabilization of wastes either through thermal processing or by forming a stabilized concentrate. The proposed action would involve limited waste treatment process testing and full-scale waste treatment processing for cleaning up pre-1970 Transuranic (TRU) wastes in Pit 9. The purpose of this interim action is to expedite the overall cleanup at the RWMC and to reduce the risks associated with potential migration of Pit 9 wastes to the Snake River Plain Aquifer.

Not Available

1993-10-01T23:59:59.000Z

19

EA-1338: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

38: Finding of No Significant Impact 38: Finding of No Significant Impact EA-1338: Finding of No Significant Impact Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership On the basis of the Environmental Assessment (EA), which analyzes the relevant environmental issues and the concerns of stakeholders, DOE finds that no significant impact would result from implementing the proposed action to transfer the facility to non-DOE ownership, or from the no action alternative. This Finding of No Significant Impact is pursuant to the NEPA of 1969, the CEQ's Regulations for Implementing NEPA, and the DOE NEPA Implementing Procedures. The proposed action does not constitute a major Federal action significantly affecting the environment within the mandate of NEPA. Therefore, implementation of the proposed action does not

20

EA-1406: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1406: Finding of No Significant Impact EA-1406: Finding of No Significant Impact EA-1406: Finding of No Significant Impact Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site On the basis of the Environmental Assessment. which analyzed relevant environmental issues and addressed the concerns of stakeholders, DOE finds that no significant impact will result from implementing the planned action at the New Rifle site. This FONSI is documented pursuant to NEPA, the Council on Environmental Quality's "Regulations for Implementing the Procedural Provisions of NEPA" codified at 40 CFR 1500, and DOE's "NEPA Implementing Procedures" codified at IO CFR 1021. The planned action does not constitute a major federal action that would significantly affect the quality of the environment within the mandate of NEPA.

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EA-1655: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Finding of No Significant Impact 5: Finding of No Significant Impact EA-1655: Finding of No Significant Impact The Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development The Proposed Action would create and operate an experimental facility for further advancing the development of laser-driven, plasma-based, particle beam accelerators. An existing, approximately 7,000-square-foot, accelerator laboratory area inside Building 71 at Lawrence Berkeley National Laboratory (LBNL) would be modified to accommodate the new facility. DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of No Significant Impact for the Berkeley Lab Laser Accelerator

22

EA-1563: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1563: Finding of No Significant Impact EA-1563: Finding of No Significant Impact EA-1563: Finding of No Significant Impact National Pollutant Discharge Elimination System Stormwater Compliance Alternatives at the Savannah River Site, South Carolina The Department of Energy has prepared an environmental assessment (EA) (DOE/EA-1563) to analyze the potential environmental impacts of the proposed and alternative actions to protect the quality of State waters at 38 stormwater outfalls located at the Savannah River Site (SRS). Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Finding of No Significant Impact for the National Pollutant Discharge

23

EA-1655: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

655: Finding of No Significant Impact 655: Finding of No Significant Impact EA-1655: Finding of No Significant Impact The Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development The Proposed Action would create and operate an experimental facility for further advancing the development of laser-driven, plasma-based, particle beam accelerators. An existing, approximately 7,000-square-foot, accelerator laboratory area inside Building 71 at Lawrence Berkeley National Laboratory (LBNL) would be modified to accommodate the new facility. DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of No Significant Impact for the Berkeley Lab Laser Accelerator

24

EA-1884: Finding of No Significant Impact | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1884: Finding of No Significant Impact Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO Based on the information contained in the EA, Western's Federal Action would not result in significant environmental impacts. Western has determined that its action to execute an interconnection agreement to connect the proposed Project to Western's Wray Substation and to take possession of a new switchyard, and either a 4.2-or-0.75-mile double-circuit 115-kV connector line depending on the location of the new switchyard, as well as new interconnection equipment in the existing Wray Substation does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA.

25

EA-0507: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-0507: Finding of No Significant Impact EA-0507: Finding of No Significant Impact EA-0507: Finding of No Significant Impact Federal Aviation Agency Explosive Detection System Independent Validation and Verification Program Idaho National Engineering Laboratory The proposed action to independently test explosive detection systems for the FAA at the INEL does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. This finding is based on the analysis in the environmental assessment. Therefore, the preparation of an environmental impact statement is not required for this proposed action. EA-0507-FONSI-1991.pdf More Documents & Publications EA-0507: Final Environmental Assessment EA-0822: Finding of No Significant Impact

26

EA-1097: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Finding of No Significant Impact 7: Finding of No Significant Impact EA-1097: Finding of No Significant Impact Solid waste Disposal - Nevada Test Site, Nye County, Nevada Based on the information and analysis in the EA, DOE has determined that the proposed action to modify the Area 23 landfill to comply with the new regulations and to close the Area 9 landfill and reopen it as Construction and Demolition debris landfill does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act. Thus, an environmental impact statement is not required to implement this action. EA-1097-FONSI-1995.pdf More Documents & Publications EA-1097: Final Environmental Assessment EA-1097: Finding of No Significant Impact

27

EA-1290: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

90: Finding of No Significant Impact 90: Finding of No Significant Impact EA-1290: Finding of No Significant Impact Disposition of Russian Federation Titled Natural Uranium The Proposed Action to submit an export license to the NRC and then ship up to 9,000 metric tons per year of natural uranium as UF6 (Russian Federation-titled) by truck from the Portsmouth and Paducah gaseous diffusion plants to either Hampton Roads, VA or the port of Batlitnmore, MD and thence by ocean-going freighter to St. Petersburg, Russia, and to continue these shipments for up to 15 years, entails insignificant impacts and low risks. The action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act. Therefore, based upon

28

EA-1692: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Finding of No Significant Impact 2: Finding of No Significant Impact EA-1692: Finding of No Significant Impact Red River Environmental Products, LLC, Construction and Start-up of an Activated Carbon Manufacturing Facility in Red River Parish, Louisiana The proposed action evaluated by the U.S. Department of Energy in this environmental assessment (EA) is to issue a loan guarantee in the amount of $245 million to Red River Environmental Products, LLC (RREP) to support construction and start-up of an Activated Carbon (AC) manufacturing facility in Red River Parish, Louisiana. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969.

29

EA-0510: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Finding of No Significant Impact 0: Finding of No Significant Impact EA-0510: Finding of No Significant Impact High-Temperature Solid Oxide Fuel Cell (Sofc) Generator Development Project (METC) The proposed action, the Westinghouse Tubular SOFC Generator Development Project, does not constitute a major federal action normally requiring the preparation of an environmental impact statement. Based on the analysis provided in the EA, DOE determines that this action will not significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act. Therefore, an Environmental Impact Statement is not required. EA-0510-FONSI-1991.pdf More Documents & Publications EA-0510: Final Environmental Assessment WA_97_007_WESTINGHOUSE_ELECTRIC_CORPORATION_Waiver_of_Domest.pdf

30

EA-1663: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Finding of No Significant Impact 3: Finding of No Significant Impact EA-1663: Finding of No Significant Impact British Petroleum (BP) Solar Array Project at Brookhaven National Laboratory, Upton, New York This Environmental Assessment (EA) presents an analysis of the potential environmental consequences of the United States (U.S.) Department of Energy providing access, through an easement, to BP Solar for the construction of a proposed 37 megawatt (MW) photovoltaic facility and a smaller 1-2 MW, Laboratory dedicated array at Brookhaven National Laboratory (BNL) and compares the potential impacts to the No Action Alternative. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment

31

EA-1912: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Finding of No Significant Impact 2: Finding of No Significant Impact EA-1912: Finding of No Significant Impact Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA Based on the information in the EA, as summarized here, BPA and DOE-RL determines that the Proposed Action is not a major federal action significantly affecting the quality of the human environment within the meaning of NEPA (42 United States Code 4321 et seq.). Therefore, an EIS will not be prepared and BPA and DOE-RL are issuing this FONSI for the Proposed Action. EA-1912-FONSI-2012.pdf More Documents & Publications EA-1912: Draft Environmental Assessment EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA 2012 Annual Planning Summary for Bonneville Power Administration

32

EA-1664: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1664: Finding of No Significant Impact Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent Lamps The U.S. Department of Energy has determined that the adoption of energy conservation standards for General Service Fluorescent Lamps and Incandescent Reflector Lamps as described in the final rule titled the "energy Conservation Program: Energy Conservation Standards for General Service Fluorescent Lamps and Incandescent Reflector lamps," would not be a major federal action significantly affecting the quality of the human environment. Finding of No Significant Impact for 10 CFR Part 430 Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent

33

EA-1120: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

20: Finding of No Significant Impact 20: Finding of No Significant Impact EA-1120: Finding of No Significant Impact Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site Based on the information and analysis in the EA, DOE has determined that the proposed treatment, repackaging and storage of solid residues at the Rocky Flats Environmental Technology Site does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an Environmental Impact Statement is not required and DOE is issuing this Finding of No Significant Impact for the proposed action. EA-1120-FONSI-1996.pdf More Documents & Publications EA-1120: Final Environmental Assessment EA-0995: Finding of No Significant Impact

34

EA-1157: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

157: Finding of No Significant Impact 157: Finding of No Significant Impact EA-1157: Finding of No Significant Impact Methyl Chloride via Oxyhydrochlorination of Methane: A Building Black for Chemicals and Fuels from Natural Gas The proposed Federal action, to provide cost-shared financial assistance for demonstration of the OHC process in an engineering scale facility, does not constitute a major Federal action that would significantly affect the quality of the human environment as defined by NEPA. This conclusion is based on the analysis contained in the EA. Therefore, an Environmental Impact Statement is not required and DOE is issuing this FONSI. EA-1157-FONSI-1996.pdf More Documents & Publications EA-1157: Final Environmental Assessment EA-1091: Finding of No Significant Impact EA-1183: Finding of No Significant Impact

35

EA-1331: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Finding of No Significant Impact 1: Finding of No Significant Impact EA-1331: Finding of No Significant Impact Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site Based on the analysis and information provided in the EA, DOE has determined that the proposed Federal action, to conduct air sparging at the Rock Springs in situ Oil Shale Retort Site in Sweetwater County, Wyoming, does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an Environmental Impact Statement is not required and DOE is issuing this Finding of No Significant Impact. EA-1331-FONSI-2000.pdf More Documents & Publications EA-1331: Final Environmental Assessment EA-1219: Finding of No Significant Impact

36

EA-1131: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

131: Finding of No Significant Impact 131: Finding of No Significant Impact EA-1131: Finding of No Significant Impact Relocation of Neutron Tube Target Loading Operation, Los Alamos Laboratory, Los Alamos, New Mexico The United States Department of Energy finds that there would be no significant impact from proceeding with its proposal to relocate NTTL operations from TA-21 to TA-16 at the Los Alamos National Laboratory, Los Alamos, New Mexico. DOE makes this Finding of No Significant Impact pursuant to the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality regulations, and the DOE NEPA regulations. Based on the environmental assessment that analyzes the relocation of operations, the proposed action does not constitute a major Federal action which would significantly affect the human environment

37

EA-1059: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1059: Finding of No Significant Impact 1059: Finding of No Significant Impact EA-1059: Finding of No Significant Impact Radioactive Source Recovery Program The United States Department of Energy (DOE) finds that there would be no significant impact from proceeding with its proposal to establish a routine radioactive source recovery program at the Los Alamos National Laboratory, Los Alamos, New Mexico. DOE makes this Finding of No Significant Impact pursuant to the National Environmental Policy Act (NEPA), the Council on Environmental Quality regulations, and the DOE NEPA regulations. Based on the environmental assessment that analyzes the source recovery program, the proposed action does not constitute a major Federal action which would significantly affect the human environment within the meaning of NEPA.

38

EA-1605: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1605: Finding of No Significant Impact Biomass Cogeneration and Heating Facilities at the Savannah River Site, South Carolina The Department of Energy has prepared an environmental assessment (EA) (DOE/EA-1605) to analyze the potential environmental impacts of the proposed construction and operation of new biomass cogeneration and heating facilities located at the Savannah River Site (SRS). DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment . Therefore, the preparation of an environmental impact statement (EIS) is not required and DOE is issuing this finding of no significant impact (FONSI). Finding of No Significant Impact for Biomass Cogeneration and Heating

39

EA-1662: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Finding of No Significant Impact 2: Finding of No Significant Impact EA-1662: Finding of No Significant Impact Energy Conservation Program: Energy Conservation Standards for Certain Consumer Products (Dishwashers, Dehumidifiers, Microwave Ovens, and Electric and Gas Kitchen Ranges and Ovens) and for Certain Commercial and Industrial Equipment (Commercial Clothes Washers) This chapter describes potential environmental effects that may result from amended energy conservation standards for residential cooking products and commercial clothes washers. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of No Significant Impact for 10 CFR Part 430 Energy Conservation

40

EA-1310: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

10: Finding of No Significant Impact 10: Finding of No Significant Impact EA-1310: Finding of No Significant Impact Decontamination and Dismantlement of the Advanced Reactivity Measurement Facility and Coupled Fast Reactivity Measurements Facility at the Idaho National Engineering and Environmental Laboratory Based on the analysis presented in the attached EA, and on public comment received on the draft predecision EA, I have determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment. Therefore, preparation of an environmental impact statement is not required. EA-1310-FONSI-2000.pdf More Documents & Publications EA-1310: Final Environmental Assessment EA-1772: Finding of No Significant Impact EA-1083: Final Environmental Assessment

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EA-1001: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

001: Finding of No Significant Impact 001: Finding of No Significant Impact EA-1001: Finding of No Significant Impact Commercialization of the Mound Plant Based on the analysis of impacts in the environmental assessment, the proposed action to lease all or portions of the Mound Plant to commercial enterprises for sublease to other potential business enterprises for commercial use consistent with the "Mound Plant Future Use Plan" and the environmental assessment for the proposed action would not significantly affect the quality of the human environment within the meaning of NEPA. Therefore, the Department is issuing this Finding of No Significant Impact and an Environmental Impact Statement is not required. EA-1001-FONSI-1994.pdf More Documents & Publications EA-1001: Final Environmental Assessment

42

EA-1676: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Finding of No Significant Impact 6: Finding of No Significant Impact EA-1676: Finding of No Significant Impact Loan Guarantee for U.S. Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon The U.S. Department of Energy is proposing to issue a loan guarantee to U.S Geothermal Inc. (U.S Geothermal) for construction and startup of a geothermal facility (Facility) in Vale, Oregon. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of No Significant Impact for Department of Energy Loan Guarantee For U.S. Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon, DOE/EA-1676 (December 2009)

43

EA-1682: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

682: Finding of No Significant Impact 682: Finding of No Significant Impact EA-1682: Finding of No Significant Impact Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington, Conducted under the American Recovery and Reinvestment Act of 2009 This EA evaluates the potential impacts from upgrading and extending the service life of the existing 242-A Evaporator located in the 200 East Area of the Hanford Site near Richland, Washington. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of no Significant Impact for the Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the

44

EA-1483: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

483: Finding of No Significant Impact 483: Finding of No Significant Impact EA-1483: Finding of No Significant Impact Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory-East Argonne, Illinois DOE has prepared an Environmental Assessment (EA), DOE/EA-1483, evaluating the decontamination and decommissioning of the Juggernaut Reactor at Argonne National Laboratory-East (ANL-E), in Argonne, Illinois. Based on the analysis in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Finding of No Significant Impact for the Proposed Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory -

45

EA-1211: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

211: Finding of No Significant Impact 211: Finding of No Significant Impact EA-1211: Finding of No Significant Impact Relocation and Storage of Isotopic Heat Sources, Hanford Site, Richland, Washington Based on the analysis in the EA (DOE/EA-1211), and after considering preapproval review comments of the State of Washington and the Yakama Indian Nation, I conclude that the proposed Relocation and Storage of Isotopic Heat Sources at the Hanford Site, Richland, Washington does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an EIS for the proposed action is not required. EA-1211-FONSI-1997.pdf More Documents & Publications EA-1211: Final Environmental Assessment EA-0915: Finding of No Significant Impact

46

EA-1260: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

260: Finding of No Significant Impact 260: Finding of No Significant Impact EA-1260: Finding of No Significant Impact Transfer of 1100 Area, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington Based on the analysis in the EA and comments received on the draft EA, DOE had decided that the proposed transfer of the 1100 "Area, southern rail connection, and rolling stockto a non-federal entity does not constitute a major federal action significantly affecting thequality of the human environment within the meaning of NEPA. Therefore, an EIS for the proposed action is not required. EA-1260-FONSI-1998.pdf More Documents & Publications EA-1260: Final Environmental Assessment and Finding of No Significant Impact EIS-0222: Draft Environmental Impact Statement EIS-0222: Final Environmental Impact Statement

47

EA-1137: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

37: Finding of No Significant Impact 37: Finding of No Significant Impact EA-1137: Finding of No Significant Impact Nonnuclear Consolidation Weapons Production Support Project for the Kansas City Plant Kansas City, Missouri Based on the analysis of impacts in the EA, the proposed action to use an electrochemical etching process on solid depleted uranium components at the DOE's Kansas City Plant would not significantly affect the quality of the human environment within the meaning of NEPA. Therefore, the Department is issuing this finding of no significant impact and the preparation of an environmental impact statement is not required. Furthermore, there is no practicable alternative to locating the proposed action in the floodplain (because the Kansas City Plant is located entirely within the floodplain),

48

EA-1236: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

236: Finding of No Significant Impact 236: Finding of No Significant Impact EA-1236: Finding of No Significant Impact Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3, Natrona County, Wyoming Based on the analysis of the Sitewide Environmental Assessment for Naval Petroleum Reserve No. 3 (NPR-3) DOE has determined that the proposed action to conduct activities in anticipation of possible transfer of NPR-3 out of Federal operation is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act. Therefore an environmental impact statement is not required and DOE is issuing this finding of no significant impact. EA-1236-FONSI-1998.pdf More Documents & Publications EA-1008: Final Environmental Assessment

49

EA-0881: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-0881: Finding of No Significant Impact Tank 241-c-103 Organic Vapor and Liquid Characterization and Supporting Activities, Hanford Site, Richland, Washington The proposed sampling of the vapor space and organic layer in Tank 241-C-103 and measuring of the thickness of the organic layer does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the NEPA. This finding is based on information and analysis in the EA. Therefore, an environmental impact statement is not required for this proposed action. EA-0881-FONSI-1992.pdf More Documents & Publications EA-0881: Final Environmental Assessment EA-0915: Final Environmental Assessment EA-0904: Finding of No Significant Impact

50

EA-1684: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1684: Finding of No Significant Impact Construction and Operation of the Facility for Rare Isotope Beams, Michigan State University, East Lansing, Michigan The U.S. Department of Energy proposes to fund the Facility for Rare Isotope Beams (FRIB) at Michigan State University (MSU). The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of No Significant Impact for DOE Funding of the Construction And Operation Of The Facility For Rare Isotope Beams, Michigan State University, East Lansing, Michigan, DOE/EA-1684 (September 2010) More Documents & Publications

51

EA-1146: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

46: Finding of No Significant Impact 46: Finding of No Significant Impact EA-1146: Finding of No Significant Impact Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado Based on the information and analysis in the EA, DOE has determined that the proposed increase in, and operation of, radioactive waste storage capacity at the Rocky Flats Environmental Technology Site does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 as amended. Therefore, an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact for the proposed action. EA-1146-FONSI-1996.pdf More Documents & Publications EA-1146: Final Environmental Assessment

52

EA-1219: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

19: Finding of No Significant Impact 19: Finding of No Significant Impact EA-1219: Finding of No Significant Impact Hoe Creek Underground Coal Gasification Test Site Remediation Based upon the information and analysis provided in the EA, DOE has determined that the proposed Federal action, to conduct air sparging with bioremediation at the Hoe Creek Underground Coal Gasification Test Site in Campbell County, Wyoming, does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act. Therefore, an Environmental Impact Statement is not required and DOE is issuing this Finding of No Significant Impact. EA-1219-FONSI-1997.pdf More Documents & Publications EA-1219: Final Environmental Assessment

53

EA-1917: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1917: Finding of No Significant Impact Wave Energy Test Facility Project, Newport, OR Based on the information presented in the Final EA, (DOE/EA-1917), and the commitment in the MAP to mitigate impacts on biological resources, including species protected under the ESA and the Marine Mammal Protection Act, to less-than-significant levels, DOE has determined that the Proposed Action will not constitute a major Federal action significantly affecting the quality of the human environment within the context of NEPA. Therefore, the preparation of an environmental impact statement is not required, and DOE is issuing this Mitigated FONSI. EA-1917-FONSI-2012.pdf More Documents & Publications EA-1917: Draft Environmental Assessment

54

EA-1705: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1705: Finding of No Significant Impact Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan The frontier Project consists of the design, construction and operation of a biorefinery producing ethanol and other co-products from cellulosic materials utilizing a proprietary pretreatment and fermentation process. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of No Significant Impact for the Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter

55

EA-1648: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Finding of No Significant Impact 8: Finding of No Significant Impact EA-1648: Finding of No Significant Impact White Earth Nation Wind Energy Project, Becker County, Minnesota, White Earth Indian Reservation, U.S.A. This Congressionally Directed Funding would allow the White Earth Nation to build on the findings of a prior DOE First Steps grant in developing available wind resources. DOE has determined that this action would not constitute a major federal action significantly affecting the quality of the human environment. Finding of No Significant Impact for the White Earth Nation Wind Energy Project Becker County, Minnesota, White Earth Indian Reservation, U.S.A., DOE/EA-1648 (April 2009) More Documents & Publications EA-1648: Final Environmental Assessment EA-1809: Notice of Availability

56

EA-1651: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1651: Finding of No Significant Impact U-233 Material Downblending and Disposition Project at the Oak Ridge National Laboratory, Oak Ridge, Tennessee This environmental assessment (EA) evaluates the impacts of planned activities to modify selected Oak Ridge National Laboratory (ORNL) facilities; process the ORNL inventory of uranium-233 (U-233); and transport the processed material to a long-term disposal facility. Based on the results of the analyses reported in the Final EA, DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act (NEPA) of 1969. Finding of No Significant Impact for U-233 Material Downblending and

57

EA-1080: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

80: Finding of No Significant Impact 80: Finding of No Significant Impact EA-1080: Finding of No Significant Impact Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System, IN and TN The Department of Energy has prepared an Environmental Assessment (EA) for a project proposed by NOXSO Corporation for the cost-shared design, construction, and operation of the NOXSO SO2/NOX Removal Flue Gas Cleanup System. DOE has determined that the proposed Federal action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act. Finding of No Significant Impact for the Proposed Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System, DOE/EA-1080 (June 1995) More Documents & Publications

58

EA-1486: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

486: Finding of No Significant Impact 486: Finding of No Significant Impact EA-1486: Finding of No Significant Impact Methow Valley Irrigation District Project, East and West Diversion Screening Proposal Bonneville Power Administration (BPA) has proposed to fund fish screen replacements at the Methow Valley Irrigation District's (MVID's) East and West Diversion canals, both located near Twisp, Washington, in Okanogan County. BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, in accordance with the National Environmental Policy Act. Finding of No Significant Impact (FONSI) Methow Valley Irrigation District Project East and West Diversion Screening Project, DOE/EA-1486 (March 2004) More Documents & Publications

59

EA-1682: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Finding of No Significant Impact 2: Finding of No Significant Impact EA-1682: Finding of No Significant Impact Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington, Conducted under the American Recovery and Reinvestment Act of 2009 This EA evaluates the potential impacts from upgrading and extending the service life of the existing 242-A Evaporator located in the 200 East Area of the Hanford Site near Richland, Washington. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of no Significant Impact for the Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the

60

EA-1336: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

336: Finding of No Significant Impact 336: Finding of No Significant Impact EA-1336: Finding of No Significant Impact Ocean Sequestration of Carbon Dioxide Field Experiment This Finding of No Significant Impact is made pursuant to the National Environmental Policy Act (NEPA) of 1969 [42 U.S. Code 4321 et seq.]; the Council on Environmental Quality's Regulations for Implementing the Procedural Provisions of NEPA, Title 40 CFR, Part 1500-1508; and the DOE's NEPA Implementing Procedures, Title 10 CFR, Part 1021. The Proposed action does not constitute a major Federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act. Therefore, an Environmental Impact Statement is not required and DOE is issuing this FONSI. EA-1336-FEA-2001

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EA-1535: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1535: Finding of No Significant Impact Uranium Leasing Program U.S. Department of Energy Office of Legacy Management prepared the Uranium Leasing Program Programmatic Environmental Assessment (PEA) (DOE/EA-1535) to evaluate its management alternatives for the future of DOE's Uranium Leasing Program (ULP). Based on the analyses in the final PEA, I have determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment. Finding of No Significant Impact for the Uranium Leasing Program, DOE/EA-1535 (July 2007) More Documents & Publications EA-1535: Final Programmatic Environmental Assessment EIS-0472: Notice of Intent to Prepare a Programmatic Environmental Impact

62

EA-1091: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Finding of No Significant Impact 1: Finding of No Significant Impact EA-1091: Finding of No Significant Impact Calderon Cokemaking Process/Demonstration Project The proposed Federal action, to provide cost-shared financial assistance for a demonstration project including the modification of an existing process demonstration unit and operation for producing metallurgical grade coke, does not constitute a major Federal action that would significantly affect the quality of the human environment as defined by NEPA. This conclusion is based on the analysis contained in the EA. Therefore, an Environmental Impact Statement is not required and DOE is issuing this FONSI. EA-1091-FONSI-1996.pdf More Documents & Publications EA-1091: Final Environmental Assessment EA-1157: Finding of No Significant Impact

63

EA-1672: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Finding of No Significant Impact 2: Finding of No Significant Impact EA-1672: Finding of No Significant Impact Basin Electric Power Cooperative Culbertson Combustion Turbine Generator Project Western Area Power Administration proposes to modify its transmission system to accommodate new generation resources from the peaking facility into the transmission system. Basin Electric would own and operate the peaking facility and associated features. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of No Significant Impact, Culbertson Combustion Turbine Generator Project, Montana, DOE/EA-1672 (June 2009)

64

EA-1676: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

676: Finding of No Significant Impact 676: Finding of No Significant Impact EA-1676: Finding of No Significant Impact Loan Guarantee for U.S. Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon The U.S. Department of Energy is proposing to issue a loan guarantee to U.S Geothermal Inc. (U.S Geothermal) for construction and startup of a geothermal facility (Facility) in Vale, Oregon. The Department of Energy has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Finding of No Significant Impact for Department of Energy Loan Guarantee For U.S. Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon, DOE/EA-1676 (December 2009)

65

EA-1770: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1770: Finding of No Significant Impact Photovoltaic Solar Project at the Durango, Colorado Site Based on the information and analysis in the EA, LM has determined that its Preferred Action (Alternative 2) will not constitute a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA). Finding of No Significant Impact Photovoltaic Solar Project at the Durango, Colorado, Disposal Site, La Plata County, DOE/EA 1770 (June 2011) More Documents & Publications EA-1770: Final Environmental Assessment 2011 Annual Planning Summary for Legacy Management (LM) 2011 Annual Planning Summary for Office of Legacy Management (LM), Grand

66

EA-1606: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

606: Finding of No Significant Impact 606: Finding of No Significant Impact EA-1606: Finding of No Significant Impact Proposed Use of Savannah River Site Lands for Military Training, SC DOE prepared an environmental assessment to analyze the potential environmental impacts of the proposed use of Savannah River Site lands and facilities for military training. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, the prepation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact EA-1606-FONSI-2011.pdf More Documents & Publications EA-1606: Final Environmental Assessment EA-1606: Draft Environmental Assessment

67

EA-1660: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Finding of No Significant Impact 0: Finding of No Significant Impact EA-1660: Finding of No Significant Impact Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington The Environmental Assessment (EA) provides information and analyses of proposed U.S. Department of Energy activities associated with consolidating existing communications operations and removing excess facilities and infrastructure within the Fitzner/Eberhardt Arid Lands Ecology Reserve (ALE) at the Hanford Site near the City of Richland, Washington. DOE has determined that the proposed action is not a major federal action significantly affecting the quality of the human environment. Finding of No Significant Impact for the Combined Community Communications

68

EA-1905: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1905: Finding of No Significant Impact The DOE CBFO reviewed the BLM EA and found that the analysis adequately covered all areas of concern, but did not include a discussion of intentional destructive acts, which it is DOE policy to include in all of its EAs (DOE Memorandum, from the Office of NEPA Policy and Compliance to the DOE NEPA Community, December 1, 2006). Therefore, DOE is including a discussion of intentional destructive acts in this FONSI. Based on the analysis in the EA, and the additional analysis in this FONSI, DOE has determined that funding the proposed action does not constitute a major federal action significantly affecting the quality of the human or physical environment within the meaning of the National Environmental

69

EA-1488: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

488: Finding of No Significant Impact 488: Finding of No Significant Impact EA-1488: Finding of No Significant Impact U-233 Disposition, Medical Isotope Production, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory, Oak Ridge, Tennessee The U. S. Department of Energy has completed an Environmental Assessment (EA) [DOE/EA-1488] that evaluates the processing of uranium-233 (233U) stored at the Oak Ridge National Laboratory (ORNL) and other small quantities of similar material currently stored at other DOE sites in order to render it suitable for safe, long-term, economical storage. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the

70

EA-1634: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1634: Finding of No Significant Impact Lawrence Berkeley National Laboratory Seismic Life-Safety Modernization, and Replacement of General Purpose Buildings, Phase 2B The U.S. Department of Eneregy has completed an Environmental Assessment (EA) (DOE/EA-1634) for the Lawrence Berkeley National Laboratory Seismic Life-Safety Modernization, and Replcaement of General Purpose Buildings, Phase 2B. Seventeen comment letters were received and addressed in the Final EA. Based on the analysis in the EA including the responses to the comments, DOE has determined that the Proposed Action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of

71

EA-1570: Final Environmental Assessment and Finding of No Significant  

Broader source: Energy.gov (indexed) [DOE]

Assessment and Finding of No Assessment and Finding of No Significant Impact EA-1570: Final Environmental Assessment and Finding of No Significant Impact Construction and Operation of Neutrinos at the Main Injector Off-Axis Electron Neutrino Appearance Experiment (NOvA) at the Fermi National Accelerator Laboratory, Batavia, Illinois, and St. Louis County, Minnesota This Environmental Assessment (DOE/EA-1570) provides information and analysis of proposed U.S. Department of Energy activities associated with constructing and operating facilities for a new neutrino physics research program called NOvA. DOE has determined that the proposed action doesn't constitute a major federal action significantly affecting the quality of the human environment. Finding of No Significant Impact for Construction and Operation of

72

EA-0981: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-0981: Finding of No Significant Impact EA-0981: Finding of No Significant Impact EA-0981: Finding of No Significant Impact Solid Waste Retrieval Complex, Enhanced Radioactive and Mixed Waste Storage Facility, Infrastructure Upgrades, and Central Waste Support Complex, Hanford Site, Richland, Washington Based on the analysis in the EA, and after considering the preapproval review comments of the State of Washington, the Nez Pierce Tribe, and the U.S. Fish and Wildlife Service, I conclude that the proposed action to initiate the proposed waste retrieval, the waste storage activities, the infrastructure upgrades, and the construction and operation of the CWSC does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore,

73

EA-1503: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1503: Finding of No Significant Impact 1503: Finding of No Significant Impact EA-1503: Finding of No Significant Impact Vermont Electric Power Company Proposed Northern Loop Project In compliance with NEPA, DOE has prepared an Environmental Assessment (EA; DOE/EA-1503), entitled Vermont Electric Power Company Proposed Northern Loop Project, to analyze the environmental impacts related to the proposed Federal action of authorizing the requested modifications to the existing PP-66 and PP-82 facilities. Based on the information contained in the EA, DOE has determined that the amendment of Presidential Permits PP-66 and PP-82, as requested in VELC0's application, would not constitute a major Federal action significantly affecting the quality of the human environment and, therefore, does not require preparation of an environmental impact

74

EA-1905: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Finding of No Significant Impact 5: Finding of No Significant Impact EA-1905: Finding of No Significant Impact The DOE CBFO reviewed the BLM EA and found that the analysis adequately covered all areas of concern, but did not include a discussion of intentional destructive acts, which it is DOE policy to include in all of its EAs (DOE Memorandum, from the Office of NEPA Policy and Compliance to the DOE NEPA Community, December 1, 2006). Therefore, DOE is including a discussion of intentional destructive acts in this FONSI. Based on the analysis in the EA, and the additional analysis in this FONSI, DOE has determined that funding the proposed action does not constitute a major federal action significantly affecting the quality of the human or physical environment within the meaning of the National Environmental

75

EA-1634: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

34: Finding of No Significant Impact 34: Finding of No Significant Impact EA-1634: Finding of No Significant Impact Lawrence Berkeley National Laboratory Seismic Life-Safety Modernization, and Replacement of General Purpose Buildings, Phase 2B The U.S. Department of Eneregy has completed an Environmental Assessment (EA) (DOE/EA-1634) for the Lawrence Berkeley National Laboratory Seismic Life-Safety Modernization, and Replcaement of General Purpose Buildings, Phase 2B. Seventeen comment letters were received and addressed in the Final EA. Based on the analysis in the EA including the responses to the comments, DOE has determined that the Proposed Action is not a major federal action that would significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of

76

EA-0923: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

923: Finding of No Significant Impact 923: Finding of No Significant Impact EA-0923: Finding of No Significant Impact Winnett School District Boiler Replacement Project Based on the analysis in the Environmental Assessment, the Department has determined that the installation of a new coal-fired system at the Winnett School District Complex does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the NEPA. Therefore, the preparation of an Environmental Impact Statement is not required and the Department is issuing this Finding of No Significant Impact. EA-0923-FONSI-1993.pdf More Documents & Publications EA-0923: Final Environmental Assessment EA-1183: Finding of No Significant Impact EA-0962: Finding of No Significant Impact

77

No Significant Impact Effluent Reduction Los Alamos National Laboratory  

Broader source: Energy.gov (indexed) [DOE]

Finding of Finding of No Significant Impact Effluent Reduction Los Alamos National Laboratory Los Alamos, New Mexico U. S. Department of Energy Los Alamos Area Office 528 35th Street Los Alamos, NM 87544 DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT EFFLUENT REDUCTION LOS ALAMOS NATIONAL LABORATORY EFFLUENT REDUCTION FINAL ENVIRONMENTAL ASSESSMENT: The Environmental Assessment (EA) for Effluent Reduction (DOE/EA-1156) (attached) briefly provides sufficient evidence and analysis t o determine that a finding of no significant impact is appropriate for this action. The EA documents the evidence and analysis in the following chapters: 1. Purpose and Need for Agency Action; 2. Description of Alternatives; 3. Affected Environment and Environmental Consequences; 4. Abnormal Events; 5. Agencies

78

EA-1871: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1871: Finding of No Significant Impact Energy Efficiency Design Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings Based on an DOE/EA-1871, DOE has determined that revising the Federal building energy efficiency standards to ASHRAE 90.1-2007 and IECC 2009 would not be a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an EIS is not required, and DOE is issuing this Finding of No Significant Impact. EA-1871-FONSI-2011.pdf More Documents & Publications EA-1871: Final Environmental Assessment EA-1872: Draft Environmental Assessment EA-1918: Finding of No Significant Impact

79

EA-1255: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1255: Finding of No Significant Impact 1255: Finding of No Significant Impact EA-1255: Finding of No Significant Impact Project Partnership Transportation of Foreign-Owned Enriched Uranium from the Republic of Georgia Based on the analysis in the Environmental Assessment for Project Partnership, and based on the previous Environmental Assessment (DOE/EA-1006) and Finding of No Significant Impact for Project Sapphire, DOE has determined that the transportation of about 5 kilograms of enriched uranium nuclear fuel from the Republic of Georgia to the United Kingdom does not constitute a major Federal action significantly affecting the human environment. Therefore, an environmental impact statement is not required. EA-1255-FONSI-1998.pdf More Documents & Publications EA- 1255: Finding of No Significant Impact

80

EA-1087: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

87: Finding of No Significant Impact 87: Finding of No Significant Impact EA-1087: Finding of No Significant Impact Proposed Induction Linac System Experiments in Building 51B at Lawrence Berkeley National Laboratory, Berkeley, California Based on the information and analysis in the EA, DOE has determined that the proposal to construct and operate the Induction Linac System Experiments project does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Therefore, a Finding of No Significant Impact is made and an Environmental Impact Statement is not required. EA-1087-FONSI-1995.pdf More Documents & Publications EA-1087: Final Environmental Assessment EA-1065: Finding of No Significant Impact

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EA-1065: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Finding of No Significant Impact 5: Finding of No Significant Impact EA-1065: Finding of No Significant Impact Proposed Construction and Operation of a Genome Sequencing Facility in Building 64 at Lawrence Berkeley Laboratory, Berkeley, California Based on the information and analysis in the EA, DOE has determined that the proposal to construct and operate the Genome Sequencing Facility does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Therefore, a Finding of No Significant Impact is made and an Environmental Impact Statement is not required. EA-1065-FONSI-1995.pdf More Documents & Publications EA-1065: Final Environmental Assessment EA-1087: Finding of No Significant Impact

82

EA- 1255: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1255: Finding of No Significant Impact 1255: Finding of No Significant Impact EA- 1255: Finding of No Significant Impact Project Partnership Transportation of Foreign-Owned Enriched Uranium from the Republic of Georgia Based on the analysis in this EA for Project Partnership, and based on the previous EA and Finding of No Significant Impact for Project Sapphire, the DOE has determined that the transportation of about 5 kilograms of enriched uranium nuclear fuel from the Republic of Georgia to the United Kingdom does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, an Environmental Impact Statement is not required. EA-1255-FONSI-1998.pdf More Documents & Publications EA-1255: Finding of No Significant Impact EA-1255: Final Environmental Assessment

83

EA-0962: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

62: Finding of No Significant Impact 62: Finding of No Significant Impact EA-0962: Finding of No Significant Impact Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California Based on the analysis in the Assessment, the Department has determined that the proposed construction and operation of the 12-kilovolt overhead powerline and authorization of the fresh water pipelines right-of-way on and adjacent to the Reserve do not constitute major Federal actions significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an Environmental Impact Statement is not required, and the Department is issuing this Finding of No Significant

84

EA-1916: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1916: Finding of No Significant Impact Ocean Renewable Power Company Maine, LLC Cobscook Bay Tidal Energy Pilot Project, Cobscook Bay in Washington County, Maine Based on the Final Environmental Assessment, DOE has determined that authorizing the expenditirure of federal funding to ORPC Maine to build, install, operate, and monitor a commercial-scale arry of five grid-connected TidGenTM hydrokinetic energy conversion devices on the sea floor in Cobscook Bay does not constitute a major federal action significantly affecting the quality of the human environment within the context of NEPA. Therefore, an EIS is not required and DOE is issuing this FONSI. EA-1916-FONSI-2012.pdf More Documents & Publications EA-1916: Notice of Availability of a Finding of No Significant Impact

85

EA-1673: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Finding of No Significant Impact 3: Finding of No Significant Impact EA-1673: Finding of No Significant Impact Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment Based upon the environmental assessment, DOE has determined that the adoption of the amended energy conservation standards for commercial packaged boilers and new energy conservation standards for water-cooled and evaporatively-cooled commercial package air conditioners and heat pumps with a cooling capacity at or above 240,000 Btu/h and less than 760,000 Btu/h would not constitute a major Federal action significantly affecting the quality of the human environment. Finding of No Significant Impact: Energy Conservation Program for Certain

86

EA-1565: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

565: Finding of No Significant Impact 565: Finding of No Significant Impact EA-1565: Finding of No Significant Impact Adopted Energy Conservation Standards for Distribution Transformers DOE has determined that the adoption of energy efficiency for liquid-immersed distribution transformers and medium-voltage dry-tape distribution transformers would not be a major Federal action significantly affecting the quality if the human environment. Finding of No Significant Impact: Energy Conservation Program for Commercial Equipment, Distribution Transformers More Documents & Publications Notice of Study Availability - Potential Benefits of Distributed Generation and Rate-Related Issues That May Impede Their Expansion: Federal Register Notice Volume 72, No. 40 - Mar. 1, 2007 Central Moloney: Noncompliance Determination (2013-SE-4702)

87

EA-1871: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1871: Finding of No Significant Impact EA-1871: Finding of No Significant Impact EA-1871: Finding of No Significant Impact Energy Efficiency Design Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings Based on an DOE/EA-1871, DOE has determined that revising the Federal building energy efficiency standards to ASHRAE 90.1-2007 and IECC 2009 would not be a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an EIS is not required, and DOE is issuing this Finding of No Significant Impact. EA-1871-FONSI-2011.pdf More Documents & Publications EA-1871: Final Environmental Assessment EA-1918: Final Environmental Assessment EA-1778: Draft Environmental Assessment

88

EA-0912: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

12: Finding of No Significant Impact 12: Finding of No Significant Impact EA-0912: Finding of No Significant Impact Urgent-Relief Acceptance of Foreign Research Reactor Spent Nuclear Fuel Based on the analysis in the Environmental Assessment, and after careful consideration of comments received, DOE has determined that the acceptance of up to 409 spent nuclear fuel elements from eight foreign research reactors in Europe for storage at the Savannah River Site does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act. Therefore, an Environmental Impact Statement is not required, and DOE issues this Finding of No Significant Impact. EA-0912-FONSI-1994.pdf More Documents & Publications

89

EA-0970: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

70: Finding of No Significant Impact 70: Finding of No Significant Impact EA-0970: Finding of No Significant Impact Environmental Safety and Health Analytical Laboratory Project No. 94-AA-01 Pantex Plant Amarillo, TX Based on the information contained in the Environmental Assessment, the DOE determines that the construction and operation of the Environmental Safety and Health Analytical Laboratory at Pantex Plant and demolition of the existing Analytical Chemistry Laboratory does not constitute a major federal action significantly affecting the quality of human environment within the meaning of the National Environmental Policy Act. Therefore, an Environmental Impact Statement is not required. EA-0970-FONSI-1995.pdf More Documents & Publications EA-0970: Final Environmental Assessment EA-1533: Finding of No Significant Impact

90

EA-1918: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

18: Finding of No Significant Impact 18: Finding of No Significant Impact EA-1918: Finding of No Significant Impact Energy Efficiency Design Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings (Final Rule) Based upon the EA, DOE has determined that revising the Federal building energy efficiency standards for commercial and multi-family high-rise residential buildings to ASHRAE 90.1-2010 would not be a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an environmental impact statement is not required, and DOE is issuing this FONSI. EA-1918-FONSI-2013.pdf More Documents & Publications EA-1918: Final Environmental Assessment EA-1871: Finding of No Significant Impact EA-1872: Draft Environmental Assessment

91

EA-1188: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1188: Finding of No Significant Impact Chevron U.S.A., Inc. and Santa Fe Energy Resources, Inc. Midway Valley 3D Seismic Project, Kern County, California Based on the results of the analysis in the Assessment, the Department of Energy has determined that the proposed 3-dimensional seismic survey does not constitute a major federal action that significantly affects the quality of the human environment within the meaning of the National Environmental Policy Act. Therefore, an Environmental Impact Statement is not required, and the Department of Energy is issuing this Finding of No Significant Impact. EA-1188-FONSI-1999.pdf More Documents & Publications EA-1188: Final Environmental Assessment CX-009523: Categorical Exclusion Determination

92

EA-1933: Finding of No Significant Impact | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

33: Finding of No Significant Impact 33: Finding of No Significant Impact EA-1933: Finding of No Significant Impact Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA Based on the Final EA, DOE has determined that providing federal funds to install an inline turbine on the WIP Main Canal to generate one megawatt of hydroelectric power, including design, construction, and installation of an inline turbine at Drop 4 and a power generating house, electrical substation, overhead transmission lines, and a downstream water diversion structure, would not constitute a major federal action significantly affecting the human quality of the human environment within the context of NEPA. Therefore, DOE is issuing this FONSI. EA-1933-FONSI-2012.pdf More Documents & Publications

93

EA-1809: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1809: Finding of No Significant Impact White Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN DOE's Golden Field Office has determined that providing Congressionally Directed Federal Funding to the White Earth Nation to purchase and install up to four small mid-sized wind turbines at two sites near the towns of Waubun and Naytahwaush on the White Earth Reservation in Mahnomen County in western Minnesota would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. EA-1809-FONSI-2012.pdf More Documents & Publications EA-1809: Draft Environmental Assessment EA-1809: Final Environmental Assessment EA-1809: Notice of Availability

94

EA-1887: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Finding of No Significant Impact 7: Finding of No Significant Impact EA-1887: Finding of No Significant Impact Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory, Golden, Colorado (DOE/EA-1573-S1) Based on the information presented in the Final SEA (DOE/EA-1573-S1), DOE has determined that the RFHP improvements and expansion of the sourcing of woody biomass fuels from Front Range sources to additional available regional sources do not constitute major federal actions significantly affecting the quality of the human environment in the context of NEPA. Therefore, an EIS is not required, and DOE is issuing this FONSI. EA-1573-SEA-FONSI-2012.pdf More Documents & Publications EA-1887: Supplemental Environmental Assessment EA-1573-S1: Proposed Renewable Fuel Heat Plant Improvements at the National

95

EA-1178: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Finding of No Significant Impact 8: Finding of No Significant Impact EA-1178: Finding of No Significant Impact 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington Based on the analysis in the EA, and considering the comments from the Benton County Clean Air Authority and the State of Washington, I conclude that the proposed replacement of the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a fuel source for many of these units, construction of a central control building or conversion of an existing building to operate and maintain the system, and rerouting backup electrical lines and relocating air compressors does not constitute a major Federal action significantly affecting the quality of the human environment

96

EA-1175: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1175: Finding of No Significant Impact EA-1175: Finding of No Significant Impact EA-1175: Finding of No Significant Impact Proposed Title Transfer of East Tennessee Technology Park Land and Facilities Based on the findings of DOE/EA-1175, DOE has determined that the proposed expansion of DOE's Reindustrialized Program to lease of land and facilities at East Tennessee Technology Park does not constitute a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act. Therefore, preparation of an environmental impact statement is not required. EA-1175-FONSI-1997.pdf More Documents & Publications EA-1175: Final Environmental Assessment EA-1415: Final Environmental Assessment EA-1175: Final Environmental Assessment (Addendum)

97

EA-0300: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Finding of No Significant Impact 0: Finding of No Significant Impact EA-0300: Finding of No Significant Impact Energy Conservation Standards for New Federal Residential Buildings The Department of Energy prepared an environmental assessment (EA) of the proposed interim standards. The EA addresses the possible incremental environmental effects attributable to the application of the proposed interim standards to the design of new federal residential buildings. Based on the findings of the EA, DOE determined that the proposed interim standards do not constitute a major Federal actions significantly affecting the quality of the human environment, within the meaning of NEPA. Therefore, an environmental impact statement is not required. EA-0300-FONSI-1986.pdf More Documents & Publications

98

EA-1886: Finding of No Significant Impact | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Finding of No Significant Impact Finding of No Significant Impact EA-1886: Finding of No Significant Impact Big Sky Regional Carbon Sequestration Partnership - Phase III: Large Volume CO2 Injection-Site Characterization, Well Drilling, and Infrastructure Development, Injection, MVA, and Site Closure, Kevin Dome, Toole County, Montana Based on the findings of this EA and after careful consideration of all public and agency comments, DOE has determined that its proposed action of providing $63.8 million in the form of cost-shared federal funding and MSU's construction and operation of the Big Sky Regional Carbon Sequestration Partnership Phase III: Kevin Dome Carbon Storage Project would not significantly affect the quality of the human environment. Therefore, preparation of an environmental impact statement is not

99

EA-1916: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1916: Finding of No Significant Impact Ocean Renewable Power Company Maine, LLC Cobscook Bay Tidal Energy Pilot Project, Cobscook Bay in Washington County, Maine Based on the Final Environmental Assessment, DOE has determined that authorizing the expenditirure of federal funding to ORPC Maine to build, install, operate, and monitor a commercial-scale arry of five grid-connected TidGenTM hydrokinetic energy conversion devices on the sea floor in Cobscook Bay does not constitute a major federal action significantly affecting the quality of the human environment within the context of NEPA. Therefore, an EIS is not required and DOE is issuing this FONSI. EA-1916-FONSI-2012.pdf More Documents & Publications EA-1916: Final Environmental Assessment

100

EA-1793: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1793: Finding of No Significant Impact Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site DOE prepared an environmental assessment (EA), for the Replacement Capability for the Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site to evaluate potential environmental impacts related to replacement capability options. Based on the analysis presented in the EA, the selected action would not significantly affect the quality ofthe human environment. Therefore, preparation ofan environmental impact statement is not required. EA-1793-FONSI-2011.pdf More Documents & Publications EA-1793: Final Environmental Assessment

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EA-0826: Revised Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

26: Revised Finding of No Significant Impact 26: Revised Finding of No Significant Impact EA-0826: Revised Finding of No Significant Impact Natural Resource Management Activities at the Savannah River Site, Aiken, SC The Department of Energy Savannah River Operations Office (SR) prepared an environmental assessment (EA) (DOE/EA-0826) in 1993 to analyze the potential environmental impacts of continued management of natural resources at the Savannah River Site (SRS) located near Aiken, South Carolina. Based on the analyses in the EA, DOE-SR determined that the proposed action was not a major Federal action significantly affecting the human environment within the meaning of NEPA, and for that reason issued a finding of no significant impact (FONSI) dated July 15, 1993. Revised Finding of No Significant Impact for the Natural Resource

102

FINDING OF NO SIGNIFICANT IMPACT ENVIRONMENTAL ASSESSMENT FOR THE FUTURE LOCATION  

Broader source: Energy.gov (indexed) [DOE]

30, 2002 DOEIEA-1438 . 30, 2002 DOEIEA-1438 . FINDING OF NO SIGNIFICANT IMPACT ENVIRONMENTAL ASSESSMENT FOR THE FUTURE LOCATION OF HEAT SOURCEfRADIOISOTOPE POWER SYSTEM: ASSEMBLY AND TEST OPERATIONS CURRENTLY LOCATED AT THE MOUND SITE AGENCY: U.S. Department of Energy ACTION: Finding of No Significant Impact SUMMARY: The U.S. Department of Energy (the Department) has completed an Environmental Assessment for the Future Location of the Reat SourcelRadioisotope Power System Assembly and Test Operations Currently Located at the Mound Site. Based on the analysis in the environmental assessment, the Department has determined that the proposed action, the relocation of the Department's heat source and radioisotope power system operations, does not constitute' a major Federal action significantly affecting the

103

EA-1875: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

of No Significant Impact EA-1875: Finding of No Significant Impact The Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine DOE's proposed action is to authorize the...

104

EA-1194: Finding of No Significant Impact (Revised) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

194: Finding of No Significant Impact (Revised) 194: Finding of No Significant Impact (Revised) EA-1194: Finding of No Significant Impact (Revised) Expansion and Operation of the Central Shops Borrow Pit, Savannah River Site The Department of Energy prepared an environmental assessment (EA) (DOE/EA-1194) in 1997 for the expansion and operation of the existing Central Shops Borrow Pit (i.e., SRS Facility 632-G) at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE determined that the action was not a major Federal action significantly affecting the quality of the human environment within the meaning of National Environmental Policy Act. Revised Finding of No Significant Impact for Expansion and Operation of the Central Shops Borrow Pit at the Savannah River Site

105

EA-1070: Revised Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

70: Revised Finding of No Significant Impact 70: Revised Finding of No Significant Impact EA-1070: Revised Finding of No Significant Impact Natural Fluctuation of Water Level in Par Pond and Reduced Water Flow in Steel Creek below L Lake at the Savannah River Site The Department of Energy (DOE) has prepared an environmental assessment (EA) for the proposed natural fluctuation of water level in Par Pond, and reduced water flow in Steel Creek below L Lake at the Savannah River Site near Aiken, South Carolina. Based on analyses in the EA, DOE determined that the proposed action was not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act. Revised Finding of No Significant Impact for the Natural Fluctuation of Water Level in Par Pond and Reduced Water Flow in Steel Creek below L Lake

106

Action Items  

Broader source: Energy.gov (indexed) [DOE]

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

107

DOE/EA-0826: Revised Finding of No Significant Impact for the Natural Resource Management Activities at the Savannah River Site (04/22/05)  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact for the Natural Resource Management Activities at the Savannah River Site Agency: U.S. Department of Energy Action: Revised Finding of No Significant Impact Summary: The Department of Energy (DOE) Savannah River Operations Office (SR) prepared an environmental assessment (EA) (DOE/EA-0826) in 1993 to analyze the potential environmental impacts of continued management of natural resources at the Savannah River Site (SRS) located near Aiken, South Carolina. Based on the analyses in the EA, DOE-SR determined that the proposed action was not a major Federal action significantly affecting the human environment within the meaning of NEPA, and for that reason issued a finding of no significant impact (FONSI) dated July 15, 1993. The proposed action in that EA was based upon

108

EO 13212: Actions To Expedite Energy-Related Projects | Department of  

Broader source: Energy.gov (indexed) [DOE]

2: Actions To Expedite Energy-Related Projects 2: Actions To Expedite Energy-Related Projects EO 13212: Actions To Expedite Energy-Related Projects The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people. In general, it is the policy of this Administration that executive departments and agencies (agencies) shall take appropriate actions, to the extent consistent with applicable law, to expedite projects that will increase the production, transmission, or conservation of energy. EO 13212: Actions To Expedite Energy-Related Projects More Documents & Publications Executive Order 13212 - Actions To Expedite Energy-Related Projects: Federal Register Notice Volume 66, No. 99 - May 18, 2001 EO 13211: Regulations That Significantly Affect Energy Supply,

109

Finding of No Significant Impact Improvements at the Thomas Jefferson National Accelerator Facility Newsport News, Virginia  

Broader source: Energy.gov (indexed) [DOE]

IMPROVEMENTS AT THE THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY IMPROVEMENTS AT THE THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY NEWPORT NEWS, VIRGINIA AGENCY: U.S. DEPARTMENT OF ENERGY ACTION: FINDING OF NO SIGNIFICANT IMPACT SUMMARY: The U.S. Department of Energy (DOE) has completed an Environmental Assessment (DOE/EA-1384) for proposed Improvements at the Thomas Jefferson National Accelerator Facility (Jefferson Lab). Newport News, Virginia. Based on the results of the impacts analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this Finding of No

110

EA-1339: Finding of No Significant Impact (Amended) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact (Amended) Finding of No Significant Impact (Amended) EA-1339: Finding of No Significant Impact (Amended) Waste Disposition Activities at Paducah Site, Paducah, Kentucky The U.S. Department of Energy has completed an environmental assessment addendum (DOE/EA-1339-A), which is incorporated herein by reference, for proposed disposition of 17,600 m3 of waste from the Paducah Site in Paducah, Kentucky. It is anticipated that most of the waste would be transported for disposal at various locations in the United States. Based on the results of the impact analysis reported in the EA, DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore,

111

Environmental Assessment and Finding of No Significant Impact: Implementation of the Wetland Mitigation Bank Program at the Savannah River Site  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1205) for the proposed implementation of a wetland mitigation bank program at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

N /A

1999-04-28T23:59:59.000Z

112

Environmental Assessment and Finding of No Significant Impact: Pond B Dam Repair Project at the Savannah River Site  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1285) for the proposed repair of the Pond B dam at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

N /A

1999-09-27T23:59:59.000Z

113

Integrating local action elements for action analysis  

Science Journals Connector (OSTI)

In this paper, we propose a framework for human action analysis from video footage. A video action sequence in our perspective is a dynamic structure of sparse local spatial-temporal patches termed action elements, so the problems of action analysis ... Keywords: Action classification, Action distance function, Action matching, Action retrieval, Generalized Hough Transform, Implicit Shape Model, Multi-dimensional density estimation, Sparse Bayesian classifier, Spatial temporal feature

Tuan Hue Thi; Li Cheng; Jian Zhang; Li Wang; Shinichi Satoh

2012-03-01T23:59:59.000Z

114

Horticultural Significance of Photomorphogenesis  

Science Journals Connector (OSTI)

The shape of a plant may be substantially modified by the light environment in which it grows. Major aspects of morphogenesis that are affected by irradiance and/or wavelength are seed germination, development...

D. Vince-Prue; A. E. Canham

1983-01-01T23:59:59.000Z

115

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network [OSTI]

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

116

EA-1807: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Impact EA-1807: Finding of No Significant Impact Heartland Community College Wind Energy Project, Normal, McLean County, Illinois The Department of Energy's proposed action...

117

EA-1804: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Impact EA-1804: Finding of No Significant Impact Sauk Valley Community College's Wind Energy Project, Dixon, Lee County, Illinois The Department of Energy's proposed action is...

118

EA-1969: Finding of No Significant Impact | Department of Energy  

Energy Savers [EERE]

Impact Clark Fork River Delta Restoration Project, Bonner County, Idaho Bonneville Power Administration issued a Finding of No Significant Impact and Mitigation Action Plan...

119

EA-1759: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Impact EA-1759: Finding of No Significant Impact Southwest Alaska Regional Geothermal Energy Project, Naknek, Alaska The Department of Energy is proposing an action to fund...

120

EA-1652: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1652: Final Environmental Assessment EA-1885: Finding of No Significant Impact Boston Massachusetts: Solar in Action (Brochure), Solar America Cities, Energy Efficiency &...

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EA-1729: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

of No Significant Impact Removal Actions at the Technical Area III Classified Waste Landfill, Sandia National Laboratories, New Mexico The environmental assessment analyses the...

122

EA-1591: Final Environmental Assessment, Finding of No Significant...  

Broader source: Energy.gov (indexed) [DOE]

Assessment, Finding of No Significant Impact, and Mitigation Action Plan Palisades-Goshen Transmission Line Reconstruction Project This revision sheet documents the changes...

123

EA-1588: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

of No Significant Impact Sacramento Municipal Utility District 230-kV Folsom Dam Transmission Line Relocation SMUD's proposed action consists of the removal and relocation of a...

124

Workforce Diversity Action Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

125

Ecologically Significant Wetlands  

E-Print Network [OSTI]

Ecologically Significant Wetlands in the Flathead, Stillwater, and Swan River Valleys FINAL REPORT Also: Ecologically Significant Wetlands in the North Fork of the Flathead River Valley Appendix 29b #12;Ecologically Significant Wetlands in the Flathead, Stillwater, and Swan River Valleys JUNE 1, 1999 DEQ

126

Proposed Action  

E-Print Network [OSTI]

Plan and made determinations of may effect, likely to adversely affect for the Pitcher's thistle, Kirtland's warbler, bald eagle, piping plover, Karner blue butterfly, and Indiana bat. The Forest made a determination of may effect, not likely to adversely affect for designated piping plover critical habitat. September 16, 2005: The Service responded to the Forests request for formal consultation, indicating that the information received in the BA constituted a complete initiation package. September December 2005: Jessica Hogrefe (USFWS) worked with Forest biologists via email and telephone to discuss the proposed Plan and effects to listed species.

U. S. Fish; Wildlife Service

2006-01-01T23:59:59.000Z

127

EXPLANATION OF SIGNIFICANT DIFFERENCES  

Office of Legacy Management (LM)

EXPLANATION OF SIGNIFICANT DIFFERENCES EXPLANATION OF SIGNIFICANT DIFFERENCES WELDON SPRING SITE February 2005 U.S. Department of Energy Office of Legacy Management FINAL: ESD Weldon Spring Site February 2005 1 EXPLANATION OF SIGNIFICANT DIFFERENCES WELDON SPRING SITE I Introduction This document is an Explanation of Significant Differences (ESD) for three Records of Decision (RODs) for the Weldon Spring site located in St. Charles County, Missouri. These RODs were signed by the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA). The RODs addressed by this ESD are the following: * Chemical Plant Operable Unit (CPOU) ROD, signed in September 1993. This ROD

128

Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

N /A

2000-05-24T23:59:59.000Z

129

LM Significant Environmental Aspects  

Broader source: Energy.gov [DOE]

LM evaluates all of our activities for their potential impact on the environment, andidentifies those aspects that could have a significant impact if they were not controlled. This information is...

130

EA-1497: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

97: Finding of No Significant Impact 97: Finding of No Significant Impact EA-1497: Finding of No Significant Impact Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement, Cameron and Calcasieu Parishes, Louisiana DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and

131

Finding of No Significant Impact for the National Pollution Discharge Elimination System (NPDES) Stormwater Compliance Alternatives at the Savannah River Site  

Broader source: Energy.gov (indexed) [DOE]

National Pollutant Discharge Elimination System (NPDES) National Pollutant Discharge Elimination System (NPDES) Stormwater Compliance Alternatives at the Savannah River Site Agency: U.S. Department of Energy Action: Finding of No Significant Impact Summary: The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1563) to analyze the potential environmental impacts of the proposed and alternative actions to protect the quality of State waters at 38 stormwater outfalls located at the Savannah River Site (SRS). The draft EA was made available to the States of South Carolina and Georgia, and to the public, for a 30-day comment period. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within

132

EA-1628: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

628: Finding of No Significant Impact 628: Finding of No Significant Impact EA-1628: Finding of No Significant Impact Construction and Operation of a Proposed Lignocellulosic Biorefinery, POET Project LIBERTY, LLC, Emmetsburg, Iowa The Department of Energy proposes to provide financial assistance (the Proposed Action) to POET Project LIBERTY, LLC (POET) for the construction and operation of the lignocellulosic ethanol production facility (Project LIBERTY) near the City of Emmetsburg, Iowa. Mitigation Action Plan for the Environmental Assessment, Notice of Wetlands Involvement and Finding of No Significant Impact for Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa, DOE/EA-1628 (September 2008) More Documents & Publications EA-1628: Mitigation Action Plan

133

Significant Accomplishments--Dissemination  

E-Print Network [OSTI]

Significant Accomplishments-- Dissemination Four publications coming from the WISELI group accepted of difficulty/resistance FUNDING. We are working hard to find ways to continue WISELI after December 2006. We; and Alison P. Lenton. 2001. "Imagining Stereotypes Away: The Moderation of Implicit Stereotypes Through

Sheridan, Jennifer

134

Revised Finding of No Significant Impact for Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site (DOE/EA-1538)(03/11/08)  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact for Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site Agency: U.S. Department of Energy Action: Revised Finding of No Significant Impact Summary: The Department of Energy (DOE) prepared an environmental assessment (EA) (DOEEA-1538) in 2005 to evaluate the potential environmental impacts associated with the implementation of proposed and alternative actions to enhance the safe and secure storage of plutonium-bearing materials at the Savannah River Site (SRS) to meet the enhanced terrorist threat that has existed since the events of September 11, 2001. Based on the analyses in the EA, DOE determined that the proposed action was not a major Federal action significantly affecting

135

EA-1792-S1: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-S1: Finding of No Significant Impact 2-S1: Finding of No Significant Impact EA-1792-S1: Finding of No Significant Impact The U.S. Department of Energy (DOE) has completed a Supplemental Environmental Assessment (Supplemental EA)(DOE/EA-1792-S1) for the University of Maine's (UMaine) Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project - Castine. Based on the analysis in the Supplemental EA, DOE has determined that the decision to authorize the expenditure of Congressionally directed federal funding by UMaine to proceed with the deployment, testing, and retrieval of one small-scale floating turbine at the Castine site, analyzed under DOE's Proposed Action and UMaine's proposed project, will not significantly affect the quality of the human environment within the meaining of the National

136

Billy Shaw Dam and Reservoir : Environmental Assessment and Finding of No Significant Impacts.  

SciTech Connect (OSTI)

This notice announces BPA`s decision to fund the construction, operation, and maintenance of the Billy Shaw Dam and Reservoir on the Duck Valley Reservation. This project is part of a continuing effort to address system-wide fish and wildlife losses caused by the development of the hydropower system in the Columbia River Basin. BPA has prepared an Environmental Assessment (EA) evaluating the potential environmental impacts of the proposed project. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

United States. Bonneville Power Administration; Shoshone-Paiute Tribes of the Duck Valley Reservation, Nevada.

1997-03-01T23:59:59.000Z

137

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

138

EA-1890: DOE Notice of Availability of the Finding of No Significant Impact  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Finding of No Significant Impact EA-1890: DOE Notice of Availability of the Finding of No Significant Impact Ocean Power Technologies, Inc. (OPT), Reedsport PB150 Deployment and Ocean Test Project, Oregon Territorial Sea, off Reedsport, Oregon DOE's Golden Field Office has determined that providing Federal financial assistance to support the deployment and testing for one of OPT's single, full-scale 150kW PB150 PowerBuoys off the coast of Reedsport, Oregon, would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA). Therefore the preparation of an environmental impact statement is not required and DOE hereby Adopts FERC's Environmental Assessment for Hydropower License (FERC Project No. 12713-002) for the

139

EA-1890: DOE Notice of Availability of the Finding of No Significant Impact  

Broader source: Energy.gov (indexed) [DOE]

890: DOE Notice of Availability of the Finding of No 890: DOE Notice of Availability of the Finding of No Significant Impact EA-1890: DOE Notice of Availability of the Finding of No Significant Impact Ocean Power Technologies, Inc. (OPT), Reedsport PB150 Deployment and Ocean Test Project, Oregon Territorial Sea, off Reedsport, Oregon DOE's Golden Field Office has determined that providing Federal financial assistance to support the deployment and testing for one of OPT's single, full-scale 150kW PB150 PowerBuoys off the coast of Reedsport, Oregon, would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA). Therefore the preparation of an environmental impact statement is not required and DOE hereby Adopts FERC's Environmental

140

Finding of No Significant Impact (FONSI)  

Broader source: Energy.gov (indexed) [DOE]

1 March 2002 FINDING OF NO SIGNIFICANT IMPACT TRANSURANIC WASTE RETRIEVAL FROM THE 218-W-4B AND 218-W-4C LOW-LEVEL BURIAL GROUNDS HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY March 2002 U.S. Department of Energy Finding of No Significant Impact 2 March 2002 This page intentionally left blank. U.S. Department of Energy Finding of No Significant Impact 3 March 2002 AGENCY: U.S. Department of Energy ACTION: Finding of No Significant Impact SUMMARY: The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1405, for retrieval of transuranic waste from the 218-W-4B and 218-W-4C low-level burial grounds located in the 200 West Area of the Hanford Site, Richland, Washington. Based on the

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE/EA-1605: Finding of No Significant Impact for the Environmental Assessment for Biomass Cogeneration and Heating Facilities at the Savannah River Site (August 2008)  

Broader source: Energy.gov (indexed) [DOE]

Biomass Cogeneration and Heating Facilities at the Savannah River Site Agency: U.S. Department of Energy Action: Finding of No Significant Impact Summary: The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1605) to analyze the potential environmental impacts of the proposed construction and operation of new biomass cogeneration and heating facilities located at the Savannah River Site (SRS). The draft EA was made available to the States of South Carolina and Georgia, and to the public, for a 30-day comment period. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the

142

February 2013 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

3 3 Standards Actions Technical Standards Program Newsletter U . S . D E PA R T M E N T O F O ffi ce O f nuclear SaFety ENERGY inSide thiS iSSue * Featured DOE Technical Standards Activities * DOE Technical Standards Cost- Savings and Access Improvement Initiative * Domestic and International Nuclear Energy Voluntary Consensus Standards Needs * Nuclear Safety- Related Standards Activity Featured dOe technical StandardS activitieS DOE Technical Standards Cost-Savings and Access Improvement Initiative By Helen Todosow, Brookhaven National Laboratory The Department of Energy (DOE) Technical Standards Managers (TSM) are actively exploring ways to save the government and tax payers' money while at the same time significantly improving efficiencies in access and use of voluntary consensus

143

EA-1965: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

965: Finding of No Significant Impact 965: Finding of No Significant Impact EA-1965: Finding of No Significant Impact Florida Atlantic University Southeast National Marine Renewable Energy Center's Offshore Marine Hydrokinetic Technology Testing Project, Florida Based on the environmental assessment (EA), DOE finds that the proposed action is not a major federal action that constitutes a significant effect on the human environment. This finding and decision is based on the consideration of DOE's NEPA implementing regulations (40 CFR Part 1021) and Council on Environmental Quality criteria for significance (40 CFR 1508.27), both with regard to the context and the intensity of impacts analyzed in the EA. Therefore, the proposed action does not require the preparation of an environmental impact statement.

144

EA-1965: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1965: Finding of No Significant Impact Florida Atlantic University Southeast National Marine Renewable Energy Center's Offshore Marine Hydrokinetic Technology Testing Project, Florida Based on the environmental assessment (EA), DOE finds that the proposed action is not a major federal action that constitutes a significant effect on the human environment. This finding and decision is based on the consideration of DOE's NEPA implementing regulations (40 CFR Part 1021) and Council on Environmental Quality criteria for significance (40 CFR 1508.27), both with regard to the context and the intensity of impacts analyzed in the EA. Therefore, the proposed action does not require the preparation of an environmental impact statement.

145

Finding of No Significant Impact for the Offsite Transportation of Certain Low-Level and Mixed Radioactive Waste from Savannah River Site for Treatment and Disposal at Commercial and Government Facilities, DOE/EA-1308 (02/15/01)  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact for the Offsite Transportation of Certain Low-level and Mixed Radioactive Waste from the Savannah River Site for Treatment and Disposal at Commercial and Government Facilities Agency: U. S. Department of Energy Action: Finding of No Significant Impact Summary: The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1308) to analyze the potential environmental impacts associated with the proposed offsite transportation of certain low-level radioactive waste (LLW) and mixed (i.e., hazardous and radioactive) low-level radioactive waste (MLLW) from the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the action is not a major Federal action significantly affecting

146

Finding of no significant impact shipment of stabilized mixed waste from the K-25 Site to an off-site commercial disposal facility, Oak Ridge K-25 Site, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an Environmental Assessment (EA) for the shipment of stabilized mixed waste, removed from K-1407-B and -C ponds, to an off-site commercial disposal facility (Envirocare) for permanent land disposal. Based on the analysis in the EA, DOE has determined that the proposed action is not a major federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1994-12-31T23:59:59.000Z

147

Preventive Action Number:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

148

NHMFL Emergency Action Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

149

Ecologically Significant Wetlands in the  

E-Print Network [OSTI]

Ecologically Significant Wetlands in the North Fork Flathead River Watershed Prepared See Also: Ecologically Significant Wetlands in the Flathead, Stillwater, & Swan River Valleys Appendix 29 #12;Ecologically Significant Wetlands in the North Fork Flathead River Watershed Prepared

150

EA-1894: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1894: Finding of No Significant Impact Albeni Falls Flexible Winter Lake Operations, Bonner, Idaho As a result of the analysis in this EA, I have the following findings. I find that: 1) the FWPO is not a substantial change from the SOR EIS proposed action relevant to environmental concerns; and, 2) there are no significant new circumstances or information relevant to environmental concerns and bearing on the SOR EIS proposed action or its impacts (40 C.F.R. §1502.9(c)). I have determined for my respective agency that preparation of a new or supplemental Environmental Impact Statement is not warranted to implement FWPO. As a result of the analysis in this EA, I also find that the actions proposed andn evaluated in this EA do not result in

151

Online action-to-perception transfer: Only percept-dependent action affects perception  

E-Print Network [OSTI]

a,,1 , B.M. 't Hart b,1 , F. Rösler a,c , D.Y.P. Henriques d , W. Einhäuser b , K. Fiehler modality has no task-relevant information (e.g., Colavita, 1974; Posner, 1980; Posner, Nissen, & Klein

Henriques, Denise Y. P.

152

Finding of No Significant Impact for the Construction and Operation of the Linac Coherent Light Source (LCLS) at the Stanford Linear Accelerator Center (SLAC), California (DOE/EA-1426) (2/28/03)  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy (DOE) U.S. Department of Energy (DOE) Finding of No Significant Impact Construction and Operation of the Linac Coherent Light Source (LCLS) at the Stanford Linear Accelerator Center (SLAC), California. AGENCY: U.S. Department of Energy (DOE) ACTION: Finding of No Significant Impact (FONSI) SUMMARY: The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1426, evaluating the proposed action to construct and operate the Linac Coherent Light Source (LCLS) at the Stanford Linear Accelerator Center (SLAC). Based upon the information and analyses in the EA, the DOE has determined that the proposed federal action does not significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969.

153

TOWARDS AFFECTIVE ALGORITHMIC COMPOSITION  

E-Print Network [OSTI]

TOWARDS AFFECTIVE ALGORITHMIC COMPOSITION Duncan Williams* , Alexis Kirke* , Eduardo Reck Miranda are driving an emerging field: affective algorithmic composition. Strate- gies for algorithmic composition within the last decade) implementing systems for algorithmic composition with the intention of targeting

Miranda, Eduardo Reck

154

EA-1712: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Finding of No Significant Impact 2: Finding of No Significant Impact EA-1712: Finding of No Significant Impact Exide Technologies Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Bristol, Tennessee, and Columbus, Georgia Based on the analyses in the environmental assessment, DOE determined that its Proposed Action, awarding a federal grant to Exide Technologies to facilitate expansion of operations at two existing Exide facilities, would result in no significant adverse impacts. Finding of No Significant Impact for Exide Technoligies Electric Drive Vehicles Battery and Component Manufacturing Initiative Application, Bristol, TN and Columbus, GA More Documents & Publications EA-1712: Final Environmental Assessment EA-1722: Finding of No Significant Impact

155

Finding of No Significant Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Finding of No Significant Impact 2 June 2001 This page intentionally left blank. U.S. Department of Energy Finding of No Significant Impact 12 June 2001 This page intentionally...

156

EA-1241: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41: Finding of No Significant Impact 41: Finding of No Significant Impact EA-1241: Finding of No Significant Impact Grizzly Substation Fiber Optic Project This notice announces BPA's decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The U. S. Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOEIEA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the U. S. Forest Service and BPA have determined that the Proposed Action is not a

157

Preventive Action Number:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

158

Corrective and Preventive Action  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Corrective/Preventive Action Process Document Number: P-008 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): P-004 Business System Management Review, F-017 Corrective Action Report Planning Worksheet or F-018 Preventive Action Report Planning Worksheet P-008 Corrective/Preventive Action Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change A Initial Release 08_0310 Implemented Multiple reviewer of "Root Cause" into process. 08_0313 Changed verbiage in Process, Responsibility and Definitions for clarification. Assigned new Backup Document Owner.

159

Chronological History of Federal Fleet Actions and Mandates (Brochure)  

SciTech Connect (OSTI)

This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

Not Available

2011-04-01T23:59:59.000Z

160

May 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Policy and Procedures for the Review of Federal Actions Impacting the Environment  

Broader source: Energy.gov [DOE]

This manual establishes polices and procedures for carrying out the EPA's responsibilities to review and comment on Federal actions affecting the quality of the environment.

162

Policy and Procedures for the Review of Federal Actions Impacting the Environment  

Broader source: Energy.gov [DOE]

This manual establishes policies and procedures for carrying out the Environmental Protection Agency's responsibilities to review and comment on Federal actions affecting the quality of the environment.

163

A Taulation o£ Significant Changes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Taulation o£ Significant Changes Taulation o£ Significant Changes Made to the Design o£ the Advanced photon Source CAPS) Between February 1986 and March 1987 Martin Knott LS-92 5/4/87 NOT FOR DISTRIBUTION FOR REFERENCE ONLY LS-92 5/4/87 A Taulation o£ Significant Changes Made to the Design of the Advanced photon Source (APS) Between February 1986 and March 1987 Martin Knott 1.0 Introduction The purpose of this note is to document and enumerate the major design changes to the APS made during the period between February 1986 when the first Conceptual Design Report (CDR) was issued (ANL-86-8) and March 1987 as the final design changes are being made in preparation for the issuance of the 1987 version of the CDR. While the material which follows is by no means exhaustive, it represents the principal features affected by the redesign

164

EA-1706: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1706: Finding of No Significant Impact West Tennessee Solar Farm Project, Haywood County, Tennessee Based on the analyses in the environmental assessment, DOE determined that its proposed action - allowing the State of Tennessee to use some of its State Energy Program funds to assist in the development of the West Tennessee Solar Farm Project - would not result in any significant adverse impacts. Finding of No Significant Impact for the West Tennessee Solar Farm Project Haywood County, Tennessee More Documents & Publications EA-1706: Mitigation Action Plan EA-1706: Final Environmental Assessment 2012 Annual Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office

165

EA-1704: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1704: Finding of No Significant Impact Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi The Department of Energy completed an Environmental Assessment and Notice of Wetland Involvement that analyzed the potential environmental impacts associated with the design, construction, and operation of the BlueFire Fulton Renewable Energy, LLC Cellulosic Biorefinery near the city of Fulton, Mississippi. Mitigated Finding of No Significant Impact BlueFire Fulton Renewable Energy, LLC Cellulosic Biorefinery Project More Documents & Publications EA-1704: Mitigation Action Plan EA-1704: Final Environmental Assessment EA-1789: Finding of No Significant Impact

166

EA-1837: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1837: Finding of No Significant Impact EA-1837: Finding of No Significant Impact EA-1837: Finding of No Significant Impact Performance Verification Laboratory, Morgantown, West Virginia Based on the analyses in the environmental assessment, DOE determined that its proposed action - to design, construct, and make operational a DOE Performance Verification Laboratory facility for verifying the energy performance pf appliances and equipment to facilitiate improved enforcement of energy conservation standards and ENERGY STAR programs - would result in no significant adverse impacts. Finding of No Significant Impact and Final Environmental Assessment for National Energy Technology Laboratory Performance Verification Laboratory, Morgantown, West Virginia More Documents & Publications EA-1837: Final Environmental Assessment

167

EA-1837: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1837: Finding of No Significant Impact Performance Verification Laboratory, Morgantown, West Virginia Based on the analyses in the environmental assessment, DOE determined that its proposed action - to design, construct, and make operational a DOE Performance Verification Laboratory facility for verifying the energy performance pf appliances and equipment to facilitiate improved enforcement of energy conservation standards and ENERGY STAR programs - would result in no significant adverse impacts. Finding of No Significant Impact and Final Environmental Assessment for National Energy Technology Laboratory Performance Verification Laboratory, Morgantown, West Virginia More Documents & Publications EA-1837: Final Environmental Assessment

168

EA-1716: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1716: Finding of No Significant Impact Honeywell International, Inc., Electric Drive Vehicle Battery and Component Manufacturing Initiative Project Massac County, Illinois Based on the analyses in the Environmental Assessment (EA), DOE determined that its proposed action-awarding a federal greant to Honeywell International Inc. (Honeywell) for the construction of a manufacturing plant to produce a critical battery material, lithium hexafluorophosphate (LiPF6)- would result in no significant adverse impacts. FInding of No Significant Impact for Electric Drive Vehicle Battery and Component Manufacturing Initiative Project, Honeywell International, Inc, Massac County, Illinois, DOE/EA-1716, September 2010 More Documents & Publications

169

EA-1591: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1591: Finding of No Significant Impact Palisades - Goshen Transmission Line Reconstruction Project The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan

170

EA-1506: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1506: Finding of No Significant Impact Changing World Technologies' Thermal Conversion Process Commercial Demonstration Plant, Weld County, Colorado This Environmental Assessment examines the potential environmental impacts of the Department of Energy's decision to support the Changing World Technologies' Thermal Conversion Process project in unincorporated Weld County, Colorado, including construction and operation of the plant, as well as a No Action Alternative. Finding of No Significant Impact for Changing World Technologies' Thermal Conversion Process Commercial Demonstration Plant, Weld County, Colorado, DOE/EA-1506 (November 2004) More Documents & Publications EA-1506: Final Environmental Assessment EA-1597: Finding of No Significant Impact

171

EA-1700: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

700: Finding of No Significant Impact 700: Finding of No Significant Impact EA-1700: Finding of No Significant Impact Computational Research and Theory Facility Project, Alameda County, California The action proposed by the Department of Energy is to relocate and consolidate Advanced Scientific Computing Research funded Lawrence Berkeley National Laboratory (LBNL) programs with other LBNL/University of California Berkeley programs that focus on computational and computer science research in a new facility on the LBNL site. Finding of No Significant Impact for the Proposed Computational Research and Theory Facility Project at Lawrence Berkeley National Laboratory Berkeley, California More Documents & Publications EA-1700: Final Environmental Assessment EA-1541: Finding of No Significant Impact

172

AGENCY: ACTION: DEPARTMENT OF ENERGY  

Broader source: Energy.gov (indexed) [DOE]

ACTION: ACTION: DEPARTMENT OF ENERGY Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 Naval Petroleum and Oil Shale Reserves U.S. Department of Energy (DOE) Finding of No Significant Impact (FONSI) for the Transfer of Naval Petroleum Reserve No. 3 (DOE/EA-1236) SUMMARY: The Secretary of Energy is authorized to produce the Naval Petroleum Reserves No. 3 (NPR-3) at its maximum efficient rate (MER) consistent with sound engineering practices, for a period extending to Apr115 2000 subject to extension. Production at NPR-3 peaked in 1981 and has declined since until it has become a mature stripper field, with the average well yielding less than 2 barrels per day. The Department of Energy (DOE) has decided to discontinue Federal operation of NPR-3 at the end of its life

173

Finding of No Significant Impact for the Storage of Tritium-Producing Burnable Absorber Rods in K-Area Transfer Bay at the Savannah River Site (DOE/EA-1528) (06/01/05)  

Broader source: Energy.gov (indexed) [DOE]

the the Storage of Tritium-Producing Burnable Absorber Rods in K-Area Transfer Bay at the Savannah River Site Agency: U.S. Department of Energy (DOE) Action: Finding of No Significant Impact Summary: The DOE Savannah River Operations Office (SR) and the National Nuclear Security Administration (NNSA) Savannah River Site Office (SRSO) have prepared an environmental assessment (EA), DOE/EA-1528, to evaluate the potential environmental impacts of the temporary dry storage of a cask containing Tritium- Producing Burnable Absorber Rods (TPBARs) in the Transfer Bay in K Area at the Savannah River Site (SRS). Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the

174

DOE/EA-1636: Finding of No Significant Impact for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project EA (March 2009)  

Broader source: Energy.gov (indexed) [DOE]

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1636 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Albany- Burnt Woods and Santiam-Toledo Pole Replacement Project. This project involves replacing wood pole structures on the existing Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230-kV transmission line. BPA has prepared an environmental assessment (DOE/EA-1636) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

175

October 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Actions 1 Standards Actions 1 New Projects and DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program

176

Standards Actions, July 2002  

Broader source: Energy.gov (indexed) [DOE]

Standards Program Document Status 07-01-2002 Activity Summary In Conversion - 4 In Preparation - 46 Out for Comment - 14 Published this Month - 2 5-year Review Status Revision in Progress - 11 Reaffirmation in Progress - 12 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 19 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Re- cently Sent for Coordination 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- July 2002 Standards Actions DOE Technical Standards Projects Initiated

177

EA-1134: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1134: Finding of No Significant Impact Disposition of Prehistoric Remains Associated with the Public Water Supply Project Environmental Impacts associated with the proposed action are expected to be minor. Based on this, and on the fact that on-property reburial of the remains is generally in accordance with the wishes of the Native American Tribes and Groups, DOE-FEMP has determined that the proposed action would have no significant impact on the human environment. Therefore, no further NEPA documentation is required. EA-1134-FONSI-1997.pdf More Documents & Publications EA-1134: Final Environmental Assessment Preliminary Notice of Violation, Fluor Fernald, Inc - EA-2001-06 Lessons Learned Quarterly Report, September 1997

178

EA-1498: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

98: Finding of No Significant Impact 98: Finding of No Significant Impact EA-1498: Finding of No Significant Impact Advanced Coal Utilization Byproduct Beneficiation Processing Plant Ghent Power Station, Carroll County, Kentucky The proposed Federal action is to provide funding, through a cooperative agreement with the University of Kentucky Research Foundation (UKRF), Center for Applied Energy Research (CAER), for the design, construction, and operation of an advanced coal ash beneficiation processing plant at Kentucky Utilities (KU) Ghent Power Station in Carroll County, Kentucky. Finding of No Significant Impact for Advanced Coal Utilization Byproduct Beneficiation Processing Plant Ghent Power Station, Carroll County, Kentucky, DOE/EA-1498 (December 2004) More Documents & Publications

179

EA-1591: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91: Mitigation Action Plan 91: Mitigation Action Plan EA-1591: Mitigation Action Plan Palisades-Goshen Transmission Line Reconstruction Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Mitigation Action Plan for the Palisades-Goshen Transmission Line Reconstruction Project More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan EA-1591: Finding of No Significant Impact

180

MITIGATION ACTION PLAN  

Broader source: Energy.gov (indexed) [DOE]

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

May 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

182

Interim Action Determination  

Broader source: Energy.gov (indexed) [DOE]

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

183

Corrective Action Program Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

2006-03-02T23:59:59.000Z

184

President Obama Announces His Climate Action Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Monday, July 1, 2013 On Tuesday, June 25, in a speech at Georgetown University, President Obama announced his comprehensive plan for steady, responsible action to cut carbon pollution, prepare the Nation for the impacts of climate change, and lead international efforts to address climate change as a global challenge. The Plan builds on significant progress made during the Administration's first term on all of these fronts, including those based on the ongoing scientific work of USGCRP's 13 member-agencies, the Interagency Climate Change Adaptation Task Force in which USGCRP participates, and USGCRP's National Climate Assessment team.

185

EA-1592: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1592: Mitigation Action Plan Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant Based on the analysis in the Environmental Assessment prepared for the proposal by the GSA and NNSA, neither the construction nor operation of the selected alternative wouldhave significant environmental impact. This MAP contains mitigation and monitoring commitments for the project, including commitments set in permits for the new facility. Mitigation Action Plan for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant More Documents & Publications EA-1592: Finding of No Significant Impact

186

Findings of No Significant Impact (FONSI) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » NEPA Documents » Findings of No Significant Impact Services » NEPA Documents » Findings of No Significant Impact (FONSI) Findings of No Significant Impact (FONSI) Findings of No Significant Impact are public documents issued by a Federal agency briefly presenting the reasons why an action for which the agency has prepared an environmental assessment will not have a significant effect on the human environment and, therefore, will not require preparation of an environmental impact statement. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD October 9, 2002 EA-1434: Finding of No Significant Impact Sunrise II Water Supply Line, Kern County, California October 2, 2002 EA-1449: Finding of No Significant Impact Commercial Demonstration of the Manufactured Aggregate Processing

187

EA-1714: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1714: Finding of No Significant Impact Toda America, Incorporated, Electric Drive Vehicle Battery and Component Manufacturing Initiative Project, Battle Creek, Michigan Based on the analyses in the Environmental Assessment, DOE determined that it;s proposed action, awarding a Federal grant to Toda America, Incorporated for the construction of a new manufacturing plant, would result in no significant adverse impacts. Finding of No Significant Impact for Electric Drive Vehicle Battery and Component Manufacturing Initiative Project Toda America, Incorporated Battle Creek, Michigan More Documents & Publications EA 1714: Final Environmental Assessment EA-1711: Finding of No Significant Impact EA-1709: Finding of No Significant Impact

188

EA-1714: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1714: Finding of No Significant Impact EA-1714: Finding of No Significant Impact EA-1714: Finding of No Significant Impact Toda America, Incorporated, Electric Drive Vehicle Battery and Component Manufacturing Initiative Project, Battle Creek, Michigan Based on the analyses in the Environmental Assessment, DOE determined that it;s proposed action, awarding a Federal grant to Toda America, Incorporated for the construction of a new manufacturing plant, would result in no significant adverse impacts. Finding of No Significant Impact for Electric Drive Vehicle Battery and Component Manufacturing Initiative Project Toda America, Incorporated Battle Creek, Michigan More Documents & Publications EA 1714: Final Environmental Assessment EA-1711: Finding of No Significant Impact EA-1678: Finding of No Significant Impact

189

EA-1207: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1207: Finding of No Significant Impact 1207: Finding of No Significant Impact EA-1207: Finding of No Significant Impact Pit Disassembly and Conversion Demonstration Environmental Assessment and Research and Development Activities An environmental assessment (EA) has been prepared to assess potential environmental impacts associated with a U.S. Department of Energy (DOE) proposed action to test an integrated pit disassembly and conversion process on a relatively small sample of pits and plutonium metal at the Los Alamos National Laboratory (LANL) in New Mexico. The proposed action would involve performing work in a series of interconnected gloveboxes using remote handling, automation, and computerized control systems to minimize operator exposure where possible, increase safety, and minimize the amount

190

EA-1312: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

312: Finding of No Significant Impact 312: Finding of No Significant Impact EA-1312: Finding of No Significant Impact Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) The U.S. Department of Energy proposes a strategy to achieve ground water compliance at the Grand Junction, Colorado, LJMTRA project site, formerly known as the Climax Uranium Millsite. The proposed compliance strategy is no remediation and the application of supplemental standards. This proposed action and a no-action alternative are described in the Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) (see attached DOE/EAB 1312). The Environmental Assessment analyzes the relevant environmental issues at the Grand Junction site, which include ground water, surface water, water and

191

The theoretical significance of G  

E-Print Network [OSTI]

The quantization of gravity, and its unification with the other interactions, is one of the greatest challenges of theoretical physics. Current ideas suggest that the value of G might be related to the other fundamental constants of physics, and that gravity might be richer than the standard Newton-Einstein description. This gives added significance to measurements of G and to Cavendish-type experiments.

T. Damour

1999-01-22T23:59:59.000Z

192

Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site  

SciTech Connect (OSTI)

The U. S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the release of tritium from the southwest plume area to Fourmile Branch between 25 to 35 percent. If this proposed action is undertaken and its effectiveness is demonstrated, it may become a component of the final action in the CAP. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR 1500-1508); and the DOE Regulations for Implementing NEPA (10 CFR 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact (FONSI) or prepare an environmental impact statement (EM).

N /A

1999-12-08T23:59:59.000Z

193

May 2009 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

May 2009 May 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

194

February 2009 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

February 2009 February 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

195

Standards Actions - April 2002  

Broader source: Energy.gov (indexed) [DOE]

3-28-2002 3-28-2002 Activity Summary In Conversion - 4 In Preparation - 44 Out for Comment - 13 Published this Month - 2 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Canceled 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standards Re- cently Published 2 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- April 2002 Standards Actions DOE Technical Standards Project Canceled

196

July 2009 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

July 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

197

Action-Oriented Benchmarking:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Feb-2008 submitted to Energy Engineering Feb-2008 submitted to Energy Engineering Action-Oriented Benchmarking: Concepts and Tools Evan Mills, Paul Mathew & Mary Ann Piette, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article-Part 1 of a two-part series-we describe an "action-oriented benchmarking" approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful

198

May 2010 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

May 2010 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

199

Standards Actions, May 2002  

Broader source: Energy.gov (indexed) [DOE]

4-29-2002 4-29-2002 Activity Summary In Conversion - 4 In Preparation - 47 Out for Comment - 12 Published this Month - 6 5-year Review Status Revision in Progress - 10 Reaffirmation in Progress - 12 Supersedure in Progress - 0 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 20 Inside this issue: DOE Technical Standards Proposed for Reaffirmation 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- May 2002 Standards Actions DOE Technical Standards Proposed for Reaffirmation The following documents are currently being reevaluated under the 5-year

200

EA-1643: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

43: Finding of No Significant Impact 43: Finding of No Significant Impact EA-1643: Finding of No Significant Impact Energy Conservation Program for Commercial and Industrial Equipment: Energy Conservation Standards for Commercial Ice-Cream Freezers; Self-Contained Commercial Refrigerators, Commerical Freezers, and Commercial Refrigerator-Freezers without Doors; and Remote Condensing Commercial Refrigerators, Commercial Freezers, and Commercial Refrigerator-Freezers The proposed action is the establishment of new energy conservation standards for commerical refrigeration equipment. DOE is adopting Trial Standard Level 4 for CRE. Energy Conservation Program for Commercial and Industrial Equipment: Energy Conservation Standards for Commercial Ice-Cream Freezers; Self-Contained Commercial Refrigerators, Commerical Freezers, and Commercial

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EA-1643: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Finding of No Significant Impact 3: Finding of No Significant Impact EA-1643: Finding of No Significant Impact Energy Conservation Program for Commercial and Industrial Equipment: Energy Conservation Standards for Commercial Ice-Cream Freezers; Self-Contained Commercial Refrigerators, Commerical Freezers, and Commercial Refrigerator-Freezers without Doors; and Remote Condensing Commercial Refrigerators, Commercial Freezers, and Commercial Refrigerator-Freezers The proposed action is the establishment of new energy conservation standards for commerical refrigeration equipment. DOE is adopting Trial Standard Level 4 for CRE. Energy Conservation Program for Commercial and Industrial Equipment: Energy Conservation Standards for Commercial Ice-Cream Freezers; Self-Contained Commercial Refrigerators, Commerical Freezers, and Commercial

202

National Environmental Policy Act (NEPA) Categorically Excluded Actions |  

Broader source: Energy.gov (indexed) [DOE]

NEPA » National NEPA » National Environmental Policy Act (NEPA) Categorically Excluded Actions National Environmental Policy Act (NEPA) Categorically Excluded Actions Categorical Exclusions (CX) - Categorical exclusions are categories of actions that DOE has determined, by regulation, do not individually or cumulatively have a significant effect on the human environment and for which neither an environmental assessment nor an environmental impact statement is typically required. Title 10 Code of Federal Regulations Part 1021, National Environmental Policy Act Implementing Procedures, Appendices A and B to Subpart D, list DOE's categorical exclusions. Appendix A classes of actions are those actions considered to be general agency actions, such as awarding a contract or hiring personnel. Appendix B classes of actions

203

EA-1736: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico Based on the analysis of potential environmental impacts presented in the environmental assessment, neither the construction or operation of the expanded Sanitary Effluent Reclamation Facility considered in the two action alternatives for that facility, nor the environmental restoration action measures considered in the two action alternatives for reach S-2 of Sandia Canyon would have significant environmental impacts. Mitigation Action Plan for the Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia

204

EA-1870: Mitigation Action Plan | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

70: Mitigation Action Plan 70: Mitigation Action Plan EA-1870: Mitigation Action Plan Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The Department of Energy (DOE) issues this Mitigation Action Plan (MAP) in conjunction with its Finding of No Significant Impact as to the department's proposed action of providing costshared funding for the Utah Coal and Biomass Fueled Pilot Plant Project. Based on the analyses in the Environmental Assessment (DOE/EA-1870), DOE determined that its proposed action allowing Viresco Energy, LLC (Viresco) to use federal funding to design, construct and operate a coal and biomass gasification pilot plant (pilot plant) - would not result in any significant environmental impacts. The pilot plant would evaluate the technical feasibility of using steam hydrogasification to convert coal and biomass (such as agricultural

205

Standards Actions, May 2001  

Broader source: Energy.gov (indexed) [DOE]

30-2001 30-2001 Activity Summary In Conversion - 4 In Preparation - 39 Out for Comment - 19 Published this Month - 0 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 23 Cancellation Pending - 9 Cancellation in Progress - 18 No Current Action - 12 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Proposed for Reaffirmation 1 Proposed Cancellation of DOE Technical Standards 2 Published DOE Technical Standards 3 American National Standards Institute 3 American National Standards 6 American Society for Testing and Materials 6 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. May 2001 Standards Actions DOE Technical Standards Projects Initiated

206

Locations Everyone: Lights, Camera, Action!  

Science Journals Connector (OSTI)

Locations Everyone: Lights, Camera, Action! ... Harvard Institute of Proteomics Harvard Medical School ...

Robert F. Murphy; Joshua LaBaer

2008-12-05T23:59:59.000Z

207

EIS-0472: Mitigation Action Plan  

Broader source: Energy.gov [DOE]

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

208

EA-1725: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Finding of No Significant Impact 5: Finding of No Significant Impact EA-1725: Finding of No Significant Impact SBE, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Power Ring Manufacturing Scale-up, Barre, Vermont Based on the analyses in the Environmental Assessment, DOE determined that its proposed action, awarding a federal grant to SBE Inc. to establish an advanced Direct Current Bus capacitor manufacturing facility, would result in no significant adverse impacts. Finding of No Significant Impact for SBE, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Application Barre, Vermont More Documents & Publications EA-1725: Final Environmental Assessment Vermont Recovery Act State Memo EA-1722: Finding of No Significant Impact

209

EA-1711: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Finding of No Significant Impact 1: Finding of No Significant Impact EA-1711: Finding of No Significant Impact Saft America, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Jacksonville, Florida Based on the analyses in the environmental assessment, DOE determined that its proposed action, awarding a federal grant to Saft America, Inc to construct and operate a high-volume manufacturing plant to make advanced lithium-ion cells and batteries, would result in no significant adverse impacts. Finding of No Significant Impact for Saft America, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Jacksonville, Florida More Documents & Publications EA-1711: Final Environmental Assessment EA-1709: Finding of No Significant Impact

210

EA-1851: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1851: Finding of No Significant Impact Delphi Automotive Systems, LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application (December 2011) For more information, contact: Ms. Pierina Fayish U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, MS 922-M217 Pittsburgh, PA 15236 Fax: (412) 386-4775 Email: Pierina.Fayish@netl.doe.gov Based on the analysis in the EA, DOE has determined that the proposed action would not result in no significant adverse impacts and therefore has issued this Finding of No Significant Impact. EA-1851-FONSI-2011.pdf More Documents & Publications EA-1851: Final Environmental Assessment EA-1851: Draft Environmental Assessment EA-1869: Final Environmental Assessment and Finding of No Significant

211

Findings of No Significant Impact (FONSI) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » NEPA Documents » Findings of No Significant Impact Services » NEPA Documents » Findings of No Significant Impact (FONSI) Findings of No Significant Impact (FONSI) Findings of No Significant Impact are public documents issued by a Federal agency briefly presenting the reasons why an action for which the agency has prepared an environmental assessment will not have a significant effect on the human environment and, therefore, will not require preparation of an environmental impact statement. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD November 13, 2013 EA-1965: Finding of No Significant Impact Florida Atlantic University Southeast National Marine Renewable Energy Center's Offshore Marine Hydrokinetic Technology Testing Project, Florida

212

EA-1711: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1711: Finding of No Significant Impact EA-1711: Finding of No Significant Impact EA-1711: Finding of No Significant Impact Saft America, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Jacksonville, Florida Based on the analyses in the environmental assessment, DOE determined that its proposed action, awarding a federal grant to Saft America, Inc to construct and operate a high-volume manufacturing plant to make advanced lithium-ion cells and batteries, would result in no significant adverse impacts. Finding of No Significant Impact for Saft America, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Jacksonville, Florida More Documents & Publications EA-1711: Final Environmental Assessment EA-1709: Finding of No Significant Impact

213

EA-1802: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1802: Finding of No Significant Impact Chicago View Wind Project Chicago Heights, Cook County, Illinois The Department of Energy's Proposed Action is to authorize the expenditure of Federal funding appropriated under the American Recovery and Reinvestment Act of 2009 to design, permit, and construct the Chicago View Wind Project, a 1.5-megawatt wind turbine that would be sited on top of a construction debris landfill in Chicago Heights, southern Cook County, Illinois. Finding of No Significant Impact Chicago View Wind Project, Chicago Heights, Cook County, Illinois, DOE/EA-1802 (February 2011) More Documents & Publications EA-1802: Final Environmental Assessment EA-1807: Finding of No Significant Impact EA-1753: Finding of No Significant Impact

214

Factors Affecting Photosynthesis!  

E-Print Network [OSTI]

Factors Affecting Photosynthesis! Temperature Eppley (1972) Light Sverdrup's Critical Depth-493, but the general concept is still valid! ! #12;PB opt & Temperature! #12;Photosynthesis & Temperature! Remember: in the laboratory, we can measure photosynthesis versus irradiance (PvsE) and calculate Ek, Pmax, and alpha

Kudela, Raphael M.

215

Finding of No Significant Impacts  

Broader source: Energy.gov (indexed) [DOE]

DOE/EA 1916 DOE/EA 1916 Finding of No Significant Impacts Page 2 of 6 system; and (6) appurtenant facilities for navigation safety and operation. The project is estimated to have an annual generation of 1.25 gigawatt-hours (GWh) after the completion of Phase 2. Because the project would be connected to the existing electrical grid, on September 1, 2011, ORPC Maine applied to the Federal Energy Regulatory Commission (FERC) for an 8-year pilot project license to construct, operate, and maintain the proposed Cobscook Bay project (FERC Project No. 12711), This application required FERC to conduct a review of the potential environmental impacts of the project in accordance with the National Environmental Policy Act (NEPA). Since DOE was considering providing financial assistance for the project, DOE

216

May 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Notices 1 DOE Technical Standards Revisions 1 DOE Technical Standards Projects Initiated 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 04-27-2005 Activity Summary In Conversion - 4 In Preparation - 25

217

POSITION MANAGEMENT ACTION FORM  

E-Print Network [OSTI]

POSITION MANAGEMENT ACTION FORM Workforce Planning | 408-924-2250 classcomp@sjsu.edu SJSU Human FOR POSITION MANAGEMENT FORM Workforce Planning | 408-924-2250| classcomp@sjsu.edu SJSU Human Resources Revised contact your Workforce Planning Analyst. List the name of the position this position reports to

Eirinaki, Magdalini

218

Restoration 2013 ACTION PLAN  

E-Print Network [OSTI]

Study Taskforce, Lower Columbia Fish Recovery Board, Lower Columbia Estuary Partnership, National Marine are intended to guide or inform, as appropriate, the Actions Agencies (BPA/Corps), National Marine Fisheries was prepared by the BPA/Corps with review by and collaboration with regional restoration sponsors, researchers

219

EA-1901: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Mitigation Action Plan 1: Mitigation Action Plan EA-1901: Mitigation Action Plan Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This Mitigation Action Plan (MAP) is referenced in the Finding of No Significant Impact for the Kootenai River White Sturgeon and Burbot Hatcheries Project (Department of Energy Environmental Assessment-1901). This MAP includes all of the mitigation measures recommended in the Final Environmental Assessment to mitigate adverse environmental impacts. It includes some measures that are essential to render the impacts of the Proposed Action not significant and other measures that will decrease impacts that did not reach a level to be considered significant. EA-1901-MAP-2013.pdf More Documents & Publications

220

E-Print Network 3.0 - affects leaf properties Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

finishes expanding (Dale and Milthorpe 1983). The eventual size of the leaf is also affected... also been shown to significantly affect the ... Source: Moles, Angela - School of...

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Many Factors Affect MPG  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Many Factors Affect Fuel Economy Many Factors Affect Fuel Economy How You Drive Vehicle Maintenance Fuel Variations Vehicle Variations Engine Break-In Vehicles in traffic Quick acceleration and heavy braking can reduce fuel economy by up to 33 percent on the highway and 5 percent around town. New EPA tests account for faster acceleration rates, but vigorous driving can still lower MPG. Excessive idling decreases MPG. The EPA city test includes idling, but more idling will lower MPG. Driving at higher speeds increases aerodynamic drag (wind resistance), reducing fuel economy. The new EPA tests account for aerodynamic drag up to highway speeds of 80 mph, but some drivers exceed this speed. Cold weather and frequent short trips can reduce fuel economy, since your engine doesn't operate efficiently until it is warmed up. In colder

222

EA-1723: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1723: Finding of No Significant Impact General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, White Marsh, Maryland, and Wixom, Michigan Based on the analyses in the environmental assessment, DOE determined that its proposed action - awarding a federal grant to General Motors, LLC to establish a second-generation Global Rear-Wheel Electric drive unit components facilities - would result in no significant adverse impacts. Finding of No Significant Impact for General Motors, LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application White Marsh, Maryland and Wixom, Michigan More Documents & Publications EA-1723: Final Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment

223

EA-1709: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

09: Finding of No Significant Impact 09: Finding of No Significant Impact EA-1709: Finding of No Significant Impact Compact Power, Inc., Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Holland, Michigan DOE prepared this EA to evaluate the potential environmental consequences of providing an American Recovery and Reinvestment Act of 2009 financial assistance grant to Compact Power, Inc. to facilitate the construction and operation of a high-volume manufacturing plant to build advanced lithium-ion cells and batteries. DOE determined that its proposed action would result in no significant adverse impacts. Finding of No Significant Impact for Compact Power, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Holland, Michigan, DOE/EA-1709 (April 2010)

224

EA-1740: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

740: Finding of No Significant Impact 740: Finding of No Significant Impact EA-1740: Finding of No Significant Impact Thermal Energy Corporation Combined Heat and Power Project Houston, Texas DOE completed the Final Environmental Assessment (EA) for the Thermal Energy Corporation Combined Heat and Power Project, Houston, Texas (DOE/EA-1740). Based on the analyses in the EA, DOE determined that its proposed action-awarding a federal grant to the Thermal Energy Corporation (TECO) to facilitate installationg of a combined heat and power (CHP) system at the Texas Medical Center's district power plant in Houston, Texas-would result in no significant adverse impacts. Finding of No SIgnificant Impact and Floodplain Statement of FIndings for the Thermal Energy Corporation Combined Heat and Power Project, Houston,

225

EA-1760: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1760: Finding of No Significant Impact FutureFuel Chemical Company Electric Drive Vehicle Battery and Component Manufacturing Initiative Project, Batesville, Arkansas Based on the analyses in the Environmental Assessment, DOE determined that its proposed action, awarding a federal grant to FutureFuel Chemical Company, to partially fund the design, installation and operations of a commercial-scale plant to produce intermediate anode material for high-performance lithium-ion batteries would result in no significant adverse impacts. Finding of No Significant Impact for Electric Drive Vehicle Battery and Component Manufacturing Initiative Project Futurefuel Chemical Company Batesville, Arkansas More Documents & Publications

226

EA-1740: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Finding of No Significant Impact 0: Finding of No Significant Impact EA-1740: Finding of No Significant Impact Thermal Energy Corporation Combined Heat and Power Project Houston, Texas DOE completed the Final Environmental Assessment (EA) for the Thermal Energy Corporation Combined Heat and Power Project, Houston, Texas (DOE/EA-1740). Based on the analyses in the EA, DOE determined that its proposed action-awarding a federal grant to the Thermal Energy Corporation (TECO) to facilitate installationg of a combined heat and power (CHP) system at the Texas Medical Center's district power plant in Houston, Texas-would result in no significant adverse impacts. Finding of No SIgnificant Impact and Floodplain Statement of FIndings for the Thermal Energy Corporation Combined Heat and Power Project, Houston,

227

EA-1925: Finding of No Significant Impact | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Finding of No Significant Impact Finding of No Significant Impact EA-1925: Finding of No Significant Impact Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon Based on the final EA, DOE finds that providing federal funding for the Proposed Projects is not a major action that constitutes a significant effect on the human environment. This finding and decision is based on the consideration of DOE's NEPA implementing regulations (10 CFR Part 1021) and the CEQ's criteria for significance (40 CFR 1508.27), both with regard to the context and the intensity of impacts analyzed in the EA. Accordingly, the Proposed Projects do not require the preparation of an EIS. EA-1925-FONSI-2013.pdf More Documents & Publications EA-1925: Draft Environmental Assessment EA-1925: Final Environmental Assessment

228

EA-1744: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1744: Finding of No Significant Impact EA-1744: Finding of No Significant Impact EA-1744: Finding of No Significant Impact Brea Power II, LLC's Olinda Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas, Brea, California Based in the analyses in the Environmental Assessment, DOE determined that its proposed action - awarding a grant to Brea Power II, LLC to facilitate modifcation and expansion of an existing landfill gas collection system and construction and operation of a combined cycle power facility at the Olinda Alpha Landfill in Brea, California - would result in no significant adverse impacts. Finding of No Significant Impact for the Brea Power II, LLC's Olinda Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas, Brea, California More Documents & Publications

229

EA-1922: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1922: Finding of No Significant Impact Combined Power and Biomass Heating System, Fort Yukon, Alaska Based on the EA, DOE finds that providng federal funding for the Proposed Project is not a major action that constituents a significant effect on the human environment. This finding and decision is based on the consideration of DOE's NEPA implementing regulations (10 CFR Part 1021) and CEQ's criteria for significance (40 CFR 1508.27), both with regard to the context and the intensity of impacts analyzed in trhe EA. Accordingly, the Proposed Project does not require the preparation of an environmental impact statement. EA-1922-FONSI-2013.pdf More Documents & Publications EA-1922: Final Environmental Assessment EA-1922: Draft Environmental Assessment

230

EA-1736: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1736: Finding of No Significant Impact Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, New Mexico The Environmental Assessment provides sufficient evidence and analysis to determine that a Finding of No Significant Impact is appropriate for the proposed wastewater treatment facility footprint and operations expansion, and the environmental restoration action measures that may be required within the upper end of Sandia Canyon at Los Alamos National Laboratory. Finding of No Significant Impact for the Proposed Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of

231

EA-1713: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Finding of No Significant Impact 3: Finding of No Significant Impact EA-1713: Finding of No Significant Impact Celgard, LLC, Electric Drive Vehicle Battery and Component Manufacturing Initiative Project, Concord, North Carolina The Department of Energy's proposed action is to provide a grant to partially fund Celgard's proposed project - the construction of a small industrial facility on approximately 20.6 acres of land for the manufacture of separator materials for commercial hybrid-electric vehicle batteries. Finding of No Significant Impact and Final Environmental Assessment for Celgard LLC's Proposed Project under the Electric Drive Vehicle Battery and Component Manufacturing Initiative More Documents & Publications EA 1713: Final Environmental Assessment EA-1719: Finding of No Significant Impact

232

EA-1756: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Finding of No Significant Impact 6: Finding of No Significant Impact EA-1756: Finding of No Significant Impact Battelle Memorial Institute's Smart Grid Project at the City of Ellensburg's Renewable Energy Park, Kittitas County, Washington Based on the analysis in the environmental assessment, DOE determined that the proposed action - providing federal assistance to Battelle Memorial Institute to facilitate the installaion of 540 additional solar panels, 10 solar concentrating modules, and 8 small wind energy generating systems at the City of Ellensburg's Renewable Energy Park - would result in no significant adverse impacts. Finding of No Significant Impact for the Battelle Memorial Institute's Smart Grid Project at the City of Ellensburg's Renewable Energy Park, Kittitas County, Washington

233

EA-1685: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1685: Finding of No Significant Impact Experimental Coal Flow Program at Clemson University The Western Area Power Administration (Western) is the lead Federal agency responsible for preparing the EA. Based on findings and analysis in the environmental assessment (EA), Western has determined that with the resource protection measures, the Parker-Planet Tap 69-kV Transmission Line would not result in any significant environmental impacts. The EA provides the basis for decisions on whether the effects to land, visual, water, biological, and cultural resources, as well as socioeconomic conditions, would be significant. Environmental Assessment for Parker-Planet Tap 69-kV Transmission Line Rebuild, Upgrade and Right-Of-Way Action, DOE/EA-1685 (June 2010) Finding

234

EA-1743: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Finding of No Significant Impact 3: Finding of No Significant Impact EA-1743: Finding of No Significant Impact Air Products and Chemicals, Inc. Waste Energy Project at the AK Steel Corporation Middletown Works, Middletown, Ohio Based on the analyses in the environmental assessment, DOE determined that its proposed action - awarding a federal grant to Air Products and Chemicals, Inc to facilitate construction and operation of a waste energy recovery plant at the AK Steel Corporation Middletown Works - would result in no significant adverse impacts. Finding of No Significant Impact for the Air Products and Chemicals, Inc. Waste Energy Project at the AK Steel Corporation Middletown Works, Middletown, Ohio More Documents & Publications EA-1743: Final Environmental Assessment Project_Descriptions_ITP_ARRA_Awards.xls

235

EA-1744: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1744: Finding of No Significant Impact Brea Power II, LLC's Olinda Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas, Brea, California Based in the analyses in the Environmental Assessment, DOE determined that its proposed action - awarding a grant to Brea Power II, LLC to facilitate modifcation and expansion of an existing landfill gas collection system and construction and operation of a combined cycle power facility at the Olinda Alpha Landfill in Brea, California - would result in no significant adverse impacts. Finding of No Significant Impact for the Brea Power II, LLC's Olinda Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas, Brea, California More Documents & Publications

236

EA-1775: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

775: Finding of No Significant Impact 775: Finding of No Significant Impact EA-1775: Finding of No Significant Impact Texas A&M University Combined Heat and Power Project, College Station, Texas DOE completed the Final Environmental Assessment for the Texas A&M University Combined Heat and power Project, College Station, Texas (DOE/EA-1775). Based on the analyses in the EA, DOE determined that its proposed action-awarding a federal grant to Texas A&A University to facilitate installatino and operation of a high-efficiency combined heat and power system that would produce steam for heating and cooling as well as generate electricity-would result in no significant adverse impacts. FInding of No Significant Impact for the Txas A&M University Combined Heat and power Project, College Station, Texas

237

EA-1470: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Finding of No Significant Impact 0: Finding of No Significant Impact EA-1470: Finding of No Significant Impact Harry Allen-Mead 500 kV Transmission Line Project, Nevada Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). Based on the EA, BLM, and Western errata, Western has determined that the proposed transmission line would not result in any significant environmental impacts, and the preparation of an environmental impact statement (EIS) will not be required. Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project, DOE/EA-1470 (October 2004)

238

EA-1828: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1828: Finding of No Significant Impact Carbon Dioxide Capture from Biofuels Production and Sequestration into the Mount Simon Sandstone Phase II Project in Decatur, Illinois Based on the analyses in the environmental assessment DOE determined that its proposed action-awarding a grant to Archer Daniels Midland Company (ADM) to demonstrate an integrated system of carbon dioxide capture in an industrial setting and geologic sequestration in a sandstone reservoir-would result in no significant adverse impacts. Finding of No Significant Impact for Archer Daniels Midland Company's "CO2 Capture from Biofuels Production and Sequestration into the Mt. Simon Sandstone, Decatur, Illinois, DOE/EA-1828 (May 2011) More Documents & Publications

239

EA-1715: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1715: Finding of No Significant Impact Chemetall Foote Corporation, Electric Drive Vehicle Battery and Component Manufacturing Initiative, Kings Mountain, North Carolina and Silver Peak, Nevada The U.S. Department of Energy proposes, through a cooperative agreement with Chemetall Foote Corporation (Chemetall) to partially fund: (1) the establishment of a new 5,000 metric ton per year lithium hydroxide plant at an existing Chemetall facility in Kings Mountain, North Carolina; and (2) the refurbishment and expansion of an existing lithium brine production facility and lithium carbonate plant in Silver Peak, Nevada. DOE determined that there would be no significant adverse impacts associated with its proposed action. Finding of No Significant Impact For Chemetall Foote Corporation Electric

240

EA-1635: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Finding of No Significant Impact 5: Finding of No Significant Impact EA-1635: Finding of No Significant Impact Williston to Tioga Transmission Line Project, North Dakota Basin Electric Power Cooperative (BEPC) proposes to construct and operate a new 230-kilovolt (kV) transmission line to meet existing and future electric power requirements in northwestern North Dakota, and to interconnect this new transmission line to the Western Area Power Administration's (Western) transmission system. The EA identified no potentially significant impacts to environmental resources resulting from either Western's Federal action or Basin Electric's Proposed Project. Finding of No Significant Impact for Williston to Tioga Transmission Line Project Pre-Approval Review, DOE/EA-1635 (May 2010) More Documents & Publications

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EA-1212: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

212: Finding of No Significant Impact 212: Finding of No Significant Impact EA-1212: Finding of No Significant Impact Lease of Land for the Development of a Research Park at Los Alamos National Laboratory The U.S.. Department of Energy finds that there would be no significant impact from proceeding with its proposal to lease to the County of Los Alamos a 60-acre tract located at Technical Area 3 of Los Alamos National Laboratory, for their development and use as a research park. This finding is based on the EA that analyzes the consequences of the relevant issues of environmental concern, together with the MAP that identifies mitigations and makes commitments and Action Plans to implement these mitigation features so as to render them not significant. Therefore, no environmental impact statement is required for this proposal.

242

EA-1473: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

473: Finding of No Significant Impact 473: Finding of No Significant Impact EA-1473: Finding of No Significant Impact Partial Funding of a Proposed Life Sciences Building at Brown University, Providence, Rhode Island The proposed action consists of providing partial funding for a new Life Sciences Building on a site adjacent to the existing Grimshaw-Gudewicz Building on the Brown University campus. The occupants of the proposed facility would be scientists from the Department of Molecular and Cell Biology and Biochemistry, and the Department of Neuroscience, and a new Brain Science Program. Finding of No Significant Impact Life Sciences Building Brown University, Providence, Rhode Island DOE/EA-1473 More Documents & Publications EA-1473: Final Environmental Assessment EA-1473: Finding of No Significant Impact

243

EA-1409: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

09: Finding of No Significant Impact 09: Finding of No Significant Impact EA-1409: Finding of No Significant Impact Proposed Issuance of an Easement to Public Service Company of New Mexico for the Construction and Operation of a 12-inch Natural Gas Pipeline within Los Alamos National Laboratory, Los Alamos, NM The Environmental Assessment (EA) for the Proposed issuance of an Easement to Public Service Company of New Mexico for the Construction and Operation of a 72-inch Natural Gas Pipeline within Los Alamos National Labora ory, Los Alamos, New Mexico (DOE/EA- 7409) (attached) provides sufficient evidence and analysis to determine that a Finding Of No Significant Impact is appropriate for the Proposed Action. Department of Energy National Nuclear Security Administration Finding of No Significant Impact for the Proposed Issuance of an Easement to the Public

244

EA-1851: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1851: Finding of No Significant Impact EA-1851: Finding of No Significant Impact EA-1851: Finding of No Significant Impact Delphi Automotive Systems, LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application (December 2011) For more information, contact: Ms. Pierina Fayish U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, MS 922-M217 Pittsburgh, PA 15236 Fax: (412) 386-4775 Email: Pierina.Fayish@netl.doe.gov Based on the analysis in the EA, DOE has determined that the proposed action would not result in no significant adverse impacts and therefore has issued this Finding of No Significant Impact. EA-1851-FONSI-2011.pdf More Documents & Publications EA-1851: Final Environmental Assessment EA-1851: Draft Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment

245

EA-1785: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

785: Finding of No Significant Impact 785: Finding of No Significant Impact EA-1785: Finding of No Significant Impact Phase III Anthropogenic Test Characterization Project, Mobile County, Alabama Based on the analyses in the environmental assessment, DOE determined that its proposed action - awarding a federal grant to Southeast Regional Carbon Sequestration Partnership to inject 125,000 tons of carbon dioxide per year for three years into a deep saline aquifer - would result in no significant adverse impacts. Finding of No Significant Impact for Southeast regional Carbon Sequestration Partnership Phase III Anthropogenic Test Project Citronelle, Alabama More Documents & Publications EA-1785: Final Environmental Assessment Geologic Carbon Dioxide Storage Field Projects Supported by DOE's Sequestration Program

246

EA-1754: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1754: Finding of No Significant Impact Public Service Company of New Mexico, Photovoltaic Plus Battery for Simultaneous Voltage Smoothing and Peak Shifting Project, Bernalillo County, New Mexico Based on the analysis in the environmental assessment, DOE determined that the proposed action - providing federal asssitance to Public Service Company of New Mexico to facilitate the installation of an advanced absorbed valve-regulated lead acid battery for voltage smoothing and peak shifting - would result in no significant adverse impacts. Finding of No Significant Impact for the Public Service Company of New Mexico Photovoltaic Plus Battery for Simultaneous Voltage Smoothing and Peak Shifting Project, Bernalillo County, New Mexico

247

EA-1853: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1853: Finding of No Significant Impact Perrin Ranch Wind Energy Interconnection Project, Coconino County, Arizona Based on findings and analysis in the EA, Western has determined that with the resource protection measures, the Perrin Ranch Wind Energy Interconnection Project (Proposed Action) would not result in any significant environmental impacts. Therefore, preparation of environmental impact statement (EIS) will not be required. The basis for this determination is described in this FONSI. Finding of No Significant Impact and Floodplain Statement of Findings for Perrin Ranch Wind Energy Interconnection Project, DOE/EA-1853 (July 2011) More Documents & Publications EA-1853: Final Environmental Assessment EIS-0427: Notice of Intent to Prepare an Environmental Impact Statement and

248

EA-1635: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

635: Finding of No Significant Impact 635: Finding of No Significant Impact EA-1635: Finding of No Significant Impact Williston to Tioga Transmission Line Project, North Dakota Basin Electric Power Cooperative (BEPC) proposes to construct and operate a new 230-kilovolt (kV) transmission line to meet existing and future electric power requirements in northwestern North Dakota, and to interconnect this new transmission line to the Western Area Power Administration's (Western) transmission system. The EA identified no potentially significant impacts to environmental resources resulting from either Western's Federal action or Basin Electric's Proposed Project. Finding of No Significant Impact for Williston to Tioga Transmission Line Project Pre-Approval Review, DOE/EA-1635 (May 2010) More Documents & Publications

249

EA-1699: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Finding of No Significant Impact 9: Finding of No Significant Impact EA-1699: Finding of No Significant Impact Pope/Douglas Third Combustor Expansion Project, Alexandria, Minnesota The United States Department of Energy, National Energy Technology Laboratory (DOE NETL) prepared this Environmental Assessment (EA) to analyze the potential environmental impacts of providing funding for the proposed Pope/Douglas Third Combustor Expansion Project in Alexandria, Minnesota. Based on the EA, DOE determined that its proposed action would result in no significant adverse impacts to the human environment Finding of No significant Impact for the Pope/Douglas Third Combustor Expansion Project, Alexandria, Minnesota, DOE/EA-1699 (May 2010) More Documents & Publications EA-1699: Final Environmental Assessment

250

EA-1745: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1745: Finding of No Significant Impact Blast Furnace Gas Flare Capture Project at the ArcelorMittal USA, Inc., Indiana Harbor Steel Mill, East Chicago, Indiana Based on the analyses in the environmental assessment, DOE determined that its proposed action - awarding a federal grant to ArcelorMittal USA, Inc. to facilitate construction and operation of a boiler system that would convert blast furnace waste gas into electricity - would result in no significant adverse impacts. Finding of No Significant Impact for the Blast Furnace Gas Flare Capture Project at the Arcelormittal USA, Inc. Indiana Harbor Steel Mill, East Chicago, Indiana More Documents & Publications EA-1745: Final Environmental Assessment Project_Descriptions_ITP_ARRA_Awards.xls

251

EA-1742: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1742: Finding of No Significant Impact Rhode Island LFG Genco, LLC Combined Cycle Electricity Generation Plant Fueled by Landfill Gas, Johnston, Rhode Island Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - awarding a federal grant to Rhode Island LFG Genco, LLC to facilitate expansion of an existing landfill gas collection system and construction and operation of a combined cycle landfill gas-to-electricity generating plant - would result in no significant adverse impacts. Finding of No Significant Impact for the Rhode Island LFg Genco, LLC Combined Cycle Electricity Generation Plant Fueled by Landfill Gas Johnston, Rhode Island More Documents & Publications EA-1742: Final Environmental Assessment

252

Findings of No Significant Impact (FONSI) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 6, 2007 September 6, 2007 EA-1593: Finding of No Significant Impact Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject, Oak Ridge, Tennessee July 5, 2007 EA-1535: Finding of No Significant Impact Uranium Leasing Program July 5, 2007 EA-1573: Finding of No Significant Impact Three Site Development Projects at the National Renewable Energy Laboratory South Table Mountain Site, Colorado (also see EA-1887 and EA-1573-S1) June 26, 2007 EA-1563: Finding of No Significant Impact National Pollutant Discharge Elimination System Stormwater Compliance Alternatives at the Savannah River Site, South Carolina May 9, 2007 EA-1514: Finding of No Significant Impact Conveyance of Parcel ED-6 to the City of Oak Ridge, TN The DOE determined that the proposed action as assessed in the Final

253

EA-1775: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1775: Finding of No Significant Impact Texas A&M University Combined Heat and Power Project, College Station, Texas DOE completed the Final Environmental Assessment for the Texas A&M University Combined Heat and power Project, College Station, Texas (DOE/EA-1775). Based on the analyses in the EA, DOE determined that its proposed action-awarding a federal grant to Texas A&A University to facilitate installatino and operation of a high-efficiency combined heat and power system that would produce steam for heating and cooling as well as generate electricity-would result in no significant adverse impacts. FInding of No Significant Impact for the Txas A&M University Combined Heat and power Project, College Station, Texas

254

EA-1533: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1533: Finding of No Significant Impact Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas This environmental assessment (EA) provides sufficient evidence and analysis for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) to conclude that potential adverse effects from the upgrade of the distribution system within plant boundaries and the construction of a 10-inch gas main off the plant site for a length of 8.6 miles would be minimal, under normal conditions. A Finding of No Significant Impact is appropriate for the proposed action. Finding of No Significant Impact for the Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas More Documents & Publications

255

August 2001 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

7-31-2001 7-31-2001 Activity Summary In Conversion-4 In Preparation-43 Out for Comment-17 Published this Month-0 5-year Review Status Revision in Progress-6 Reaffirmation in Progress-23 Cancellation Pending-4 Cancellation in Progress-12 Proposed for Cancellation-13 No Current Action-11 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standard Recently Reaffirmed 1 DOE Technical Standards Recently Published 2 American National Standards Institute 2 American National Standards 4 American Society for Testing and Materials 5 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- August 2001 Standards

256

April 2008 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

3-27-2008 3-27-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in March - 0 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ April 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

257

Standards Actions, July 2001  

Broader source: Energy.gov (indexed) [DOE]

6-27-2001 6-27-2001 Activity Summary In Conversion - 4 In Preparation - 42 Out for Comment - 15 Published this Month - 1 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standard Recently Published 1 American National Standards Institute 2 American National Standards 3 American Society for Testing and Materials 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. July 2001 Standards Actions DOE Technical Standards Projects Initiated

258

July 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

6-27-2007 6-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed forReaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/ July 2007 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

259

October 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Publication Staff Roster 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-26-2006 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 16 Published in September - 1 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ October 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access

260

Mitigation Action Plan  

Broader source: Energy.gov (indexed) [DOE]

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

February 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Technical Technical Standards Program Document Status 1-18-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 10 Published in January - 3 5-year Review Status Proposed for Revision-6 Revision in Progress-4 Proposed for Reaffirmation-3 Reaffirmation in Progress-21 Cancellation Pending-16 Cancellation in Progress-0 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/ February 2005 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://tis.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

262

July 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

DOE Technical DOE Technical Standards Program Document Status 06-28-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 14 Published in June - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ July 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

263

SAVEnergy Action Plans  

SciTech Connect (OSTI)

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

264

May 2008 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

4-25-2008 4-25-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in April - 2 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ May 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

265

February 2001 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Technical Standards Program Document Status Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ Activity Summary In Conversion - 4 In Preparation - 35 Out for Comment - 18 Published this Month - 1 FY 2001 5-year Reviews Revisions in Progress - 2 Reaffirmations in Progress - 2 Supersedures in Progress - 6 Cancellations Pending - 11 Cancellations in Progress - 33 No Current Action - 16 DOE Technical Standards Project Canceled If you have any questions about this action, please contact the person listed be- low. The following DOE Technical Standards project was recently canceled: * EM Facility Hazard Categorization, Project Number SAFT-0029; EM Technical Standards Manager, John Serocki, 301-903-7999, John.Serocki@em.doe.gov, or Tom Wright, 301-903-3661, Tom.Wright@em.doe.gov. The need for this

266

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

267

February 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2

268

November 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-25-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 16 Published in September - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6

269

November 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

DOE Technical DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Revisions 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association

270

April 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 Technical Standards Published 2 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical

271

April 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

1 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status

272

CLEMSON UNIVERSITY Sustainability Action Plan  

E-Print Network [OSTI]

.......................................................................... 8 Action Steps for Sustainability Education, Culture, and Leadership CLEMSON UNIVERSITY Sustainability Action Plan Submitted by the President's Commission on Sustainability, August 1, 2011 Version 1.0.9 #12; 1 Table of Contents President

Duchowski, Andrew T.

273

Event:CDKN Action Lab | Open Energy Information  

Open Energy Info (EERE)

CDKN Action Lab CDKN Action Lab Jump to: navigation, search Calendar.png CDKN Action Lab: on 2011/04/03 "Our ambition with the Action Lab is to significantly advance climate compatible development through focusing on the relationship between knowledge, policy and action. Together, we will share knowledge and game-changing work, explore what works and what doesn't, and develop new collaborations for joined-up action. During the Lab, we will explore a number of crucial themes. These include: * building governance & policy approaches for climate compatible development * forging public-private and/or multi-sectoral partnerships * engineering climate finance & market mechanisms * enabling technological and/or social innovation * using science and evidence to inform development policy and practice"

274

EA-1706: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

706: Mitigation Action Plan 706: Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - allowing the State of Tennessee to use some of its State Energy Program funds appropriated in the American Recovery and Reinvestment Act to construct and operate the West Tennessee Solar Farm Project - would not result in any significant environmental impacts. Mitigation Action Plan for the West Tennessee Solar farm Project Haywood County, Tennessee, DOE/EA-1706 More Documents & Publications EA-1706: Finding of No Significant Impact EA-1706: Final Environmental Assessment 2012 Annual Planning Summary for Fossil Energy, National Energy Technology

275

EA-1636: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

276

EA-1921: Finding of No Significant Impact | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Finding of No Significant Impact 1: Finding of No Significant Impact EA-1921: Finding of No Significant Impact Silver Peak Area Geothermal Exploration Project, Esmeralda County, NV Based on the evaluations in the final EA and subject to the mitigations imposed by BLM and DOE, DOE has determined that no significant impact on the human environment would occur as a result of DOE's proposed action to provide a $4.47 million federal grant and Rockwood's proposed project to explore for a geothermal resource that could support the production of electricity that would serve the lithium processing plant owned by Rockwood. Therefore, preparation of an EIS is not required, and DOE is issuing this FONSI. EA-1921-FONSI-2012.pdf More Documents & Publications EA-1921: Final Environmental Assessment

277

EA-1584: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

84: Finding of No Significant Impact 84: Finding of No Significant Impact EA-1584: Finding of No Significant Impact Sandpoint Wind Installation Project, Sand Point, Alaska Based on an action by the U.S Congress, the U.S. Department of Energy has funding available to support the Alaska Energy Authority (AEA)'s Alaska Wind Energy Program. AEA proposes to provide funding received from DOE to Aleutian Wind Energy, LLC (AWE) to support the installation of a wind power generation system at the existing Tanadgusix Corporation (TDX) Power generation facility in Sand Point, Alaska. Finding of No Significant Impact for Sand Point Wind Installation Project Sand Point, Alaska, DOE/EA -1584 (September 2009) More Documents & Publications EA-1584: Final Environmental Assessment CX-002398: Categorical Exclusion Determination

278

EA-1719: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

19: Finding of No Significant Impact 19: Finding of No Significant Impact EA-1719: Finding of No Significant Impact Novolyte Technologies, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Project, Zachary, Louisiana DOE determined that there would be no significant adverse impacts from DOE's proposed action of awarding a grant to Novolyte Technologies, Inc. to partially fund its expansion of a plant in Zachary, Louisiana, thereby increasing the plant's capacity to manufacture lithium electrolytes. This expansion would support the anticipated growth in the lithium-ion battery industry and, more specifically, the electric drive vehicle industry and hybrid-electric vehicle industry. DOe further determined that there could be beneficial impacts to the local economy and reduction in greenhouse gas

279

EA-1753: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

753: Finding of No Significant Impact 753: Finding of No Significant Impact EA-1753: Finding of No Significant Impact Beacon Power Corporation Flywheel Frequency Regulation Plant, Chicago Heights, Illinois Based on the analyses in the environmental assessment (EA), DOE determined that its proposed action--awarding a federal grand to Beacon Power Corporation (Beacon Power) to facilitate installation and operation of a 20-megawatt flywheel frequency regulation plant--would result in no significant adverse impacts. DOE further determined that the proposed project could result in beneficial impacts o the nation's energy efficiency and air quality. Operating the flywheel plant could result in a decrease in carbon dioxide emissions from regional power plants. In addition, there would be small positive socioeconomic impacts from the expenditures for the

280

EA-1418: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

418: Finding of No Significant Impact 418: Finding of No Significant Impact EA-1418: Finding of No Significant Impact Otter Tail Power Company Advanced Hybrid Particulate Collector Big Stone City, Grant County, SD DOE's objective in participating in the cooperative agreement is to support demonstration of technoloy potentially capable of substantially reducing particulate emissions, particularly emissions of fine particulate, from coal-fired power plants. The environmental analysis identified that the most notable changes to result from the proposed action would occur in the following areas: air emissions, construction impacts, and solid waste disposal. Finding of No Significant Impact for the Proposed Advanced Hybrid Particulate Collector Project DOE/EA-1418 (June 2002) More Documents & Publications

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EA-1753: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Finding of No Significant Impact 3: Finding of No Significant Impact EA-1753: Finding of No Significant Impact Beacon Power Corporation Flywheel Frequency Regulation Plant, Chicago Heights, Illinois Based on the analyses in the environmental assessment (EA), DOE determined that its proposed action--awarding a federal grand to Beacon Power Corporation (Beacon Power) to facilitate installation and operation of a 20-megawatt flywheel frequency regulation plant--would result in no significant adverse impacts. DOE further determined that the proposed project could result in beneficial impacts o the nation's energy efficiency and air quality. Operating the flywheel plant could result in a decrease in carbon dioxide emissions from regional power plants. In addition, there would be small positive socioeconomic impacts from the expenditures for the

282

EA-1755: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1755: Finding of No Significant Impact Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico The Department of Energy, Carlsbad Field Office, has adopted an environmental assessment prepared by the Department of the Interior Bureau of Land Management carlsbad Field Office for the reconstruction of the South Access Road for the Waste Isolation Pilot Plant near Carlsbad, New Mexico. Finding of No Significant Impact Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant in Eddy County, New Mexico More Documents & Publications EA-1755: Mitigation Action Plan EA-1755: Final Environmental Assessment

283

EA-1833: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1833: Finding of No Significant Impact The City of El Dorado Wind Energy Project, El Dorado, Butler County, Kansas The U.S. Department of Energy's Proposed Action is to authorize the expenditure of federal funding appropriated under the American Recovery and Reinvestment Act to design, permit and construct the El Dorado Wind Energy Project, a 1.0 megawatt wind turbine to be located immediately west of the El Dorado Wetlands and Water Reclamation Facility in El Dorado, Butler County, Kansas. Finding of No Significant Impact and Floodplain Statement of Findings for the City of El Dorado Wind Energy Project, El Dorado, Butler County, Kansas, DOE/EA-1833 (February 2011) More Documents & Publications EA-1833: Final Environmental Assessment

284

EA-1929: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1929: Finding of No Significant Impact NorthStar Medical Technologies LLC, Commercial Domestic Production of the Medical Isotope Molybdenum-99 NNSA has completed the Final Environmental Assessment for the NorthStar Medical Technologies LLC, Commercial Domestic Production of the Medical Isotope Molybdenum-99. Based upon the analysis in the EA, NNSA has determined that its proposed action-to provide financial assistance to Northstar Medical Technologies LLC in a cost-sharing arrangement under a cooperative agreement to accelerate the establishment of commercial production of molybdenum-99 using accelerator technology and without the use of highly enriched uranium-would result in no significant impacts. EA-1929-FONSI-2012.pdf

285

EA-1815: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1815: Finding of No Significant Impact Cuyahoga County Agricultural Society Wind Energy Project, Berea, Cuyahoga County, Ohio The Department of Energy's proposed action is to authorize the expenditure of Federal funding appropriated under the American Recovery and Reinvestment Act to design, permit, and construct the Cuyahoga County Agricultural Society Wind Energy Project, a 660 kilowatt wind turbine at Cuyahoga County Fairgrounds in the center of the fairgrounds complex on 164 Eastland Road, Berea, Ohio. Finding of No Significant Impact Cuyahoga County Agricultural Society Wind Energy Project, Berea, Cuyahoga County, Ohio, DOE/EA-1815 (February 2011) More Documents & Publications EA-1815: DOE Notice of Availability of the

286

EA-1388: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

388: Finding of No Significant Impact 388: Finding of No Significant Impact EA-1388: Finding of No Significant Impact Groundwater Compliance at the Shiprock Uranium Mill Tailings Site The U.S. Department of Energy is proposing three ground water compliance strategies for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. These proposed strategies were derived through consultation with representatives of the Navajo UMTRA Program, the Navajo Environmental Protection Agency, and other agencies. The strategies are designed to minimize risk to human health and the environment that result from mill-related constituents in ground water and surface water. Finding of No Significant Impact Ground Water Compliance at the Shiprock Uranium Mill Tailings SIte DOE/EA-1388 (September 2001)

287

EA-1508: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1508: Finding of No Significant Impact EA-1508: Finding of No Significant Impact EA-1508: Finding of No Significant Impact Beaver Creek-Hoyt-Erie 115-kV Transmission Line Upgrade, Morgan and Weld Counties, Colorado The Western Power Administration proposes to upgrade approximately 78 miles of 115-kV transmission line between the Beaver Creek Substation, east of Brush, Colorado; the Hoyt Substation, west of Hoyt, Colorado; and the Erie Substation, near Brighton, Colorado. Western prepared an environmental assessment for the proposal. Finding of No Significant Impact and Floodplain Statement of Findings Beaver Creek-Hoyt-Erie 115-kV Transmission Line Upgrade Morgan and Weld Counties, Colorado, DOE/EA-1508 (November 2005) More Documents & Publications EA-1508: Mitigation Action Plan Lessons Learned Quarterly Report, March 2006

288

EA-1717: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

17: Finding of No Significant Impact 17: Finding of No Significant Impact EA-1717: Finding of No Significant Impact BASF Catalysts, LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Project, Elyria, Ohio The overall purpose and need for DOE action pursuant to the Vehicle Technologies Program and the funding opportunity under the Recovery Act are to accelerate the development and production of various electric drive vehicle systems by building or increasing domestic manufacturing capacity for advanced automotive batteries, their components, recycling facilities, and electric drive vehicle components in addition to stimulating the U.S. economy. DOE/EA-1717, Department of Energy, Office of Energy Efficiency and Renewable Energy, Finding of No Significant Impact, Environmental

289

EA-1717: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Finding of No Significant Impact 7: Finding of No Significant Impact EA-1717: Finding of No Significant Impact BASF Catalysts, LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Project, Elyria, Ohio The overall purpose and need for DOE action pursuant to the Vehicle Technologies Program and the funding opportunity under the Recovery Act are to accelerate the development and production of various electric drive vehicle systems by building or increasing domestic manufacturing capacity for advanced automotive batteries, their components, recycling facilities, and electric drive vehicle components in addition to stimulating the U.S. economy. DOE/EA-1717, Department of Energy, Office of Energy Efficiency and Renewable Energy, Finding of No Significant Impact, Environmental

290

EA-1858: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1858: Finding of No Significant Impact Nippon Paper Industries USA Company Biomass Cogeneration Project, Port Angeles, Clallam County, Washington The Washington State proposes to provide a $600,000 grant and $1.4 million loan from its State Energy Program funds to the Nippon Paper Industries USA Company to construct and operate a new biomass-fueled cogeneration facility that would produce both heat and power at its existing paper mill in Port Angeles, Clallam County, Washington. Mitigated Finding of No Significant Impact and Floodplain Statement of Findings for the Nippon Paper Industries USA Company Biomass Cogeneration Project Port Angeles, Washington More Documents & Publications EA-1858: DOE Notice of Availability and Notice of Floodplain Action

291

EA-1867: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1867: Finding of No Significant Impact RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011) DOE completed the Final Environmental Assessment for RTf .International ScaleUp of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies (EA-1867). Based on the analyses in the environmental assessment (EA), DOE determined that its proposed action-providing cost-shared funding to RTI International (RTI) to demonstrate the precommercial scale-up of its high-temperature syngas cleanup and carbon capture and sequestration technologies-would result in no significant adverse impacts. DOE further determined that RTI 's

292

EA-1622: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Finding of No Significant Impact 2: Finding of No Significant Impact EA-1622: Finding of No Significant Impact University of Nevada, Las Vegas Research Foundation Solar Technology Center The Department of Energy is proposing to provide funding to the University of Nevada Las Vegas (UNLV) Research Foundation to construct and operate the Solar Technology Center (STC) in collaboration with the UNLV Center for Energy Research (CER). The STC, hereinafter referred to as the Proposed Action, would operate for research and development, educational training, and as a center for renewable energy and conservation information. Environmental Assessment for the Proposed Solar Technology Center Boulder City, Nevada, DOE/EA-1622, January 2009, Finding of No Significant Impact More Documents & Publications

293

EA-1460: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

460: Finding of No Significant Impact 460: Finding of No Significant Impact EA-1460: Finding of No Significant Impact In Search of Truth Canby District Heating Project, Modoc County, California The I'SOT (In Search of Truth) community proposes to construct and operate a geothermal district heating system in Modoc County, California (Figure 1.1-1). The district heating system involves: Producing geothermal fluid (hot water) from an existing well; Using the heat from the geothermal fluid to heat community water; Piping the heated community water through a distribution piping system to provide space heating. The purpose of the proposed action is to construct and operate a direct-use heating system for the I'SOT Community in Canby, California. DOE/EA-1460; Finding of No Significant Impact for the In Search of Truth

294

EA-1364: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

364: Finding of No Significant Impact 364: Finding of No Significant Impact EA-1364: Finding of No Significant Impact Proposed Construction and Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, NM The National Nuclear Security Administration finds that there would be no significant impact from proceeding with its proposal to construct and operate a BSL-3 facility at Los Alamos National Laboratory as described in the Proposed Action or the Prefabrication Alternative or thePrefabrication/Build Alternative at any of three optional site locations identified as being suitable. This finding is based on the EA, which analyzes the consequences ofthe relevant issues of environmental concern. EA-1364-FONSI-2002.pdf More Documents & Publications EA-1364: Final Environmental Assessment

295

EA-1495: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Finding of No Significant Impact 5: Finding of No Significant Impact EA-1495: Finding of No Significant Impact USEC Inc. American Centrifuge Lead Cascade Facility at Piketon, Ohio The purpose of NRC's proposed action is to authorize possession and use of source and special nuclear material at the Lead Cascade in Piketon, Ohio. Finding of No Significant Impact for the United States Enrichment Corporation Incorporated, American Centrifuge Lead Cascade Facility at Piketon, Ohio More Documents & Publications EIS-0468: Final Environmental Impact Statement Advance Patent Waiver W(A)2012-021 Report on the Effect the Low Enriched Uranium Delivered Under the Highly Enriched Uranium Agreement Between the USA and the Russian Federation has on the Domestic Uranium Mining, Conversion, and Enrichment Industries and

296

EA-1449: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1449: Finding of No Significant Impact Commercial Demonstration of the Manufactured Aggregate Processing Technology Utilizing Spray Dryer Ash, King George County, Virgina The DOE has prepared an Environmental Assessment to analyze the potential environmental consequences of participating in a cooperative agreement with Universal Aggregates, LLC, for the design, construction, and operation of a plant to manufacture lightweight aggregates. Finding of No Significant Impact Commercial Demonstration of the Manufactured Aggregate Processing Technology Utilizing Spray Dryer Ash More Documents & Publications EA-1449: Final Environmental Assessment Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating

297

Climate Action Plan (Vermont) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vermont) Vermont) Climate Action Plan (Vermont) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Climate Policies Provider Vermont Agency of Natural Resources There is a growing scientific consensus that increasing emissions of greenhouse gases to the atmosphere are affecting the temperature and

298

Environmental Assessment - Proposed Actions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

299

Standards Actions, February 2004  

Broader source: Energy.gov (indexed) [DOE]

1 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standards Recently Published 1 Non-Government Standards 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 5 American Society for Testing and Materials (ASTM) 6 American Nuclear Society (ANS) 11 National Fire Protection Association (NFPA) 12 DOE Technical Standards Program Document Status 01-23-2004 Activity Summary In Conversion - 4 In Preparation - 36 Out for Comment - 23 Published in January - 3 5-year Review Status Revision in Progress - 13 Reaffirmation in Progress - 26 Cancellation Pending - 1 Cancellation in Progress - 3 No Current Action - 0 Inside This Visit the Technical Standards Program

300

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

302

July 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 06-28-2005 Activity Summary In Conversion - 4 In Preparation - 21 Out for Comment - 10 Published in June - 2 5-year Review Status Proposed for Revision-6 Revision in Progress-3

303

April 2011 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

3009 3009 Revision * DOE Standard 1066 Revision * New DOE Standards Projects * Incidents of Security Concern Technical Standard * Explosives Safety * Operations Assessment Field Handbook * Reporting of Radioactive Sealed Sources Program * Occurrence Reporting Causal Analysis Guide * Nuclear Safety-Related Standards Activity INSIDE THIS ISSUE April 2011 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Standard 3009 Revision The Office of Nuclear Safety Policy and Assistance (HS-21), within the Office of Health, Safety and Security (HSS), conducted workshops in January and March to support a major revision of Department of Energy (DOE) Standard 3009, Preparation Guide for U.S. Department of Energy Nonreactor

304

August 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 07-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

305

October 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-27-2007 Activity Summary In Conversion - 4 In Preparation - 26 Out for Comment - 27 Published in September - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

306

Strategic Action Plan  

Broader source: Energy.gov (indexed) [DOE]

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

307

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

308

April 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Notices 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 1 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 3-28-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 11 Published in March - 0 5-year Review Status Proposed for Revision-6 Revisions in Progress-4 Proposed for Reaffirmation-3 Reaffirmations in Progress-24 Cancellations Pending-11 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards

309

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

310

August 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 16 Published in July - 2 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0

311

Portsmouth DUF6 Conversion Final EIS - Chapter 3: Affected Environment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Portsmouth DUF Portsmouth DUF 6 Conversion Final EIS 3 AFFECTED ENVIRONMENT This EIS considers the proposed action of building and operating a conversion facility at the Portsmouth site for conversion of the Portsmouth and ETTP DUF 6 cylinder inventories. Section 3.1 presents a detailed description of the affected environment for the Portsmouth site. Because the option of shipping cylinders from the ETTP site in Oak Ridge, Tennessee, to the Portsmouth site for conversion is part of the proposed action, a detailed description of the affected environment for the ETTP site is provided in Section 3.2. 3.1 PORTSMOUTH SITE The Portsmouth site is located in Pike County, Ohio, approximately 22 mi (35 km) north of the Ohio River and 3 mi (5 km) southeast of the town of Piketon (Figure 3.1-1). The two

312

EA-0404: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-0404: Finding of No Significant Impact Innovative Clean Coal Technology Program - Coke Oven Gas Cleaning Demonstration Project at the Bethlehem Steel Corp. Sparrows Point Plant, Baltimore County, Maryland The Department of Energy prepared EA-0404 for the Coke Oven Gas Cleaning Demonstration Project at the Bethlehem Steel Corporation Sparrows Point Plant and determined it does not significantly affect the quality of the environment, so a Finding of No Significant Impact (FONSI) was issued. Finding of No Significant Impact for the Coke Oven Gas Cleaning Demonstration Project at the Bethlehem Steel Corporation Sparrows Point Plant More Documents & Publications EA-0404: Final Environmental Assessment EA-1091: Final Environmental Assessment

313

Finding of no significant impact for the joint DOE/EPA program on national industrial competitiveness through energy efficiency and economics (NICE{sup 3})  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared a Programmatic Environmental Assessment (PEA), to assess the environment impacts associated with a joint DOE/EPA cost-sharing grant program named National Industrial Competitiveness through Energy Efficiency, Environment and Economics (NICE{sup 3}). The purpose of the NICE{sup 3} Program is to encourage waste minimization technology in industry by funding projects that develop activities and process improvements to conserve energy and reduce pollution. The proposed action would provide Federal financial assistance in the form of grants to industry in order to promote pollution prevention, energy efficiency, and cost competitiveness. Based on the analysis presented in the PEA, DOE has determined that the proposed action (providing NICE{sup 3} grants for projects which are consistent with the goals of the PPA and EPACT) does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, the preparation of an Environmental Impact Statement is not needed and the Department is issuing this Finding of No Significant Impact.

NONE

1997-03-01T23:59:59.000Z

314

Final environmental assessment and Finding-of-No-Significant-Impact - drum storage facility for interim storage of materials generated by environmental restoration operations  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-0995, for the construction and operation of a drum storage facility at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for construction of the facility was generated in response to current and anticipated future needs for interim storage of waste materials generated by environmental restoration operations. A public meeting was held on July 20, 1994, at which the scope and analyses of the EA were presented. The scope of the EA included evaluation of alternative methods of storage, including no action. A comment period from July 5, 1994 through August 4, 1994, was provided to the public and the State of Colorado to submit written comment on the EA. No written comments were received regarding this proposed action, therefore no comment response is included in the Final EA. Based on the analyses in the EA, DOE has determined that the proposed action would not significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an Environmental Impact Statement is not required and the Department is issuing this Finding of No Significant Impact.

Not Available

1994-09-01T23:59:59.000Z

315

DOE/EA-1792 Finding of No Significant Impacts  

Broader source: Energy.gov (indexed) [DOE]

DOE/EA-1792 DOE/EA-1792 Finding of No Significant Impacts Page 2 of 12 ENVIRONMENTAL IMPACTS: The Final EA examines the potential environmental impacts of DOE's Proposed Action of authorizing UMaine to expend Federal funding to perform research on and development of floating offshore wind turbine platforms as well as a No Action Alternative, under which DOE would not authorize the UMaine to spend Federal funds on the proposed project. DOE assumed, for purposes of the EA, that UMaine would not conduct the offshore research and development of floating wind turbines without such financial assistance. The primary objective of UMaine testing the one-third scale floating wind turbines is to obtain motion and structural response data to compare and validate numerical models

316

Significant Environmental Aspects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Aspects Significant Environmental Aspects More Documents & Publications LM Significant Environmental Aspects CX-009630: Categorical Exclusion Determination...

317

New Facets of the Biochemistry of Steroid Hormone Action  

Science Journals Connector (OSTI)

...that many of the actions of estrogens oil the uterus may be due to liberation of...inhibitors after treatments, such as mild heating or exposure to urea, which do not affect...Invest., 43: 611 "19,1964. 186. Price, D., and Williams-Ashman, H. G...

H. G. Williams-Ashman

1965-08-01T23:59:59.000Z

318

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Temp Data Fields Matthews, Patrick...

319

Standards Actions - August 2000  

Broader source: Energy.gov (indexed) [DOE]

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

320

Standards Actions, April 2000  

Broader source: Energy.gov (indexed) [DOE]

Canceled Canceled The following DOE Technical Standards projects were recently canceled. If you have any questions about this action, please contact the persons listed below. • Accelerated Learning - A Systematic Approach, Project Number 6910-0061; Eula Baldwin, EH-31; 208-526-9472, egb@inel.gov. The need for this document no longer exists. • Environmental Safety and Health Configuration Guide, Project Number FACR-0013; Chan- dra S. Majumdar, EM-23; 301-903-7904, Fax 301-903-4423, Chandra.Majumdar @em.doe.gov. The need for a DOE Technical Standard on this matter no longer exists. • Occupational Safety and Health Handbook, Project Number HFAC-0011; Terry Krietz, EH-51; 301-903-6456, Fax 301-903-2239, Terry.Krietz@hq.doe.gov. The need for this document no longer exists.

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Standards Actions - May 2000  

Broader source: Energy.gov (indexed) [DOE]

Project Canceled Project Canceled The following DOE Technical Standards project was recently canceled. If you have any questions about this action, please contact the person listed below. • Equipment Qualification Program for DOE-Owned Nuclear Facilities and Operations, Project Number FACR-0012; Samuel Rosenbloom, EH-31; 301-903-5749, Fax 301-903- 8693, Samuel.Rosenbloom@eh.doe.gov. The need for this document no longer ex- ists. DOE Technical Standards Recently Published The following DOE Technical Standard has recently been published: • DOE-STD-1063-2000, Facility Representatives, March 2000. This document updates and supersedes DOE-STD-1063-97, October 1997. DOE employees and DOE contractors may obtain copies from the ES&H Technical Infor- mation Services, U.S. Department of Energy; 1-800-473-4375, Fax 301-903-9823.

322

Description of Proposed Action  

Broader source: Energy.gov (indexed) [DOE]

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

323

Standards Actions - January 2000  

Broader source: Energy.gov (indexed) [DOE]

Projects Initiated Projects Initiated The following DOE Technical Standards projects were recently initiated. If you have any questions or are interested in participating in the development of these stan- dards, please contact the per- sons listed below. • Establishing and Maintaining a Facility Representative Pro- gram at DOE Facilities , Project Number MGMT-0003 (revision of DOE-STD-1063-97); David Compton, S-3.1, 202-586-1034, Fax 202-586-3472, David .Compton@hq.doe.gov. • Nuclear Explosive Safety Study Process, Project Number SAFT- 0074 (Revision of DOE-STD- 3015-97); Helmut Filacchione, DP-21, 301-903-7519, Fax 301- 903-8628, Helmut.Filacchione @hq.doe.gov. DOE Technical Standards Project Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact

324

January 2012 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

* DOE Conduct of Operations Standards Revisions * New DOE Standards Projects * DOE Handbook of Operational Safety and Analysis Techniques * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE January 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Conduct of Operations Standards Revisions In the early 1990s, the Department of Energy (DOE) developed 17 technical standards to support DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The standards (STDs), listed below, provided examples, good practices, and expanded explanations of the topics in each chapter of the Order. In June 2010, the Order was revised and issued as DOE Order 422.1, Conduct of Operations. The

325

Guam Energy Action Plan  

SciTech Connect (OSTI)

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

326

Standards Actions - August 2000  

Broader source: Energy.gov (indexed) [DOE]

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

327

EA-1731: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115-kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is located in Walla Walla and Columbia counties in Washington, extending from the city of Walla Walla to near the town of Dayton. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Final Environmental Assessment

328

EA-1649: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1649: Finding of No Significant Impact Cheniere Marketing, Inc. Regarding Order Granting Application for Authorization to Export Liquified Natural Gas, Sabine Pass LNG Export Project The purpose and need for DOE action is to comply with section 3(a) of the NGA which requires DOE to issue an order granting an application for authority to export natural gas unless, after opportunity for hearing, it finds that the proposed export will not be consistent with the public interest. DOE/EA-1649, Department of Energy, Office of Fossil Energy, for Cheniere Marketing, Inc. Regarding Order Granting Application for Authorization to Export Liquified Natural Gas, Sabine Pass LNG Export Project, (February 2009) More Documents & Publications

329

EA-1412: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1412: Finding of No Significant Impact Expansion of the Volpentest Hazardous Materials Management and Emergency Response Training and Education Center, Hanford Site, Richland, Washington The U.S. Department of Energy, Richland Operation Office (DOE-RL) needs to provide cost-effective, additional personal protection and Public safety through expanding training and equipment testing facilities at the Volpentest Hazardous Materials Management and Emergency Response Training and Education Center (HAMMER) on the Hanford Site. The proposed action would include constructing and operating the EVOC, which would be located on approximately 60 acres (24.2 hectares); expanding, operating, and transferring ownership of NUTS, which is located on approximately 80 acres

330

EA-1829: Final Environmental Assessment and Finding of No Significant  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment and Finding of No Final Environmental Assessment and Finding of No Significant Impact EA-1829: Final Environmental Assessment and Finding of No Significant Impact Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI (November 2011) For more information, contact: Mr. Jesse Garcia, NEPA Document Manager U.S Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road, P.O. Box 880 Morgantown, WV 26507-0880 Telephone: 304-285-0256 Fax: 302-285-4403 Electronic mail: Jesse.Garcia@netl.doe.gov DOE completed its Final Environmental Impact Statement for the Phycal Algae Pilot Project,Wahiawa and Kalaeloa, HI (DOE/EA-1829). Based on the analyses in the environmental assessment, DOE determined that there would be no significant adverse impacts on DOE's proposed action of

331

EA-1800: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1800: Finding of No Significant Impact Monarch Warren County Wind Turbine Project Lenox Township Warren County, Illinois The U.S. Department of Energy provided Federal funding appropriated under the American Reinvestment and Recovery Act 0(2009 to the Illinois Department ofComrnerce and Economic Opportunity (DeEO) under the State Energy Program (SEP). DeEO proposes to provide approximately $5 million of its SEP funds to Monarch Wind Power (MWP) for the Monarch Warren County Wind Turbine Project (MWTP). DOE's Proposed Action is to authorize the expenditure of Federal funding under State Energy Program to design, permit, and construct a l2·turbine, 19.2 megawatt wind energy facility south of Monmouth, Illinois. Each wind turbine would have a hub height of

332

EA-1523: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1523: Finding of No Significant Impact Modifications at the Strategic Petroleum Reserve's West Hackberry Raw Water Intake Structure Site, Calcasieu Parish, Louisiana The U.S. Department of Energy Strategic Petroleum Reserve (SPR) prepared an Environmental Assessment (EA) (Attachment A) in response to a proposal to modify the West Hackberry (WH) Raw Water Intake Structure (RWIS) located near Hackberry, Louisiana. Based on the results of the EA and implementation of mitigation activities, the DOE has determined that the proposed action may result in short-term, direct environmental impacts to wetlands, biological and ecological resources, and water resources, with no potential long-term or permanent direct impacts to facility permits.

333

EA-1528: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

528: Finding of No Significant Impact 528: Finding of No Significant Impact EA-1528: Finding of No Significant Impact Storage of Tritium-Producing Burnable Absorber Rods in K-Area Transfer Bay at the Savannah River Site The proposed action is to implement the storage of TPBARs in the K-Area dry storage Transfer Bay for a period of up to two years. The Transfer Bay is proposed for the storage of TPBARs in a 10 CFR 71-certified shipping package that offers a high degree of protection for the tritiated rods. The shipping cask, its outer ISO container packaging, and the trailer portion of the tractor-trailer transporter would be parked in the Transfer Bay. The cask would remain in its assembled transport condition inside a closed ISO container for the duration of interim storage. The K-Area Transfer Bay has

334

EA-1864: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1864: Finding of No Significant Impact Electrical District 5 - Palo Verde Hub Project The U.S. Department of Energy (DOE) Western Area Power Administration (Western) along with southern Arizona electrical providers propose to acquire transmission line rights, build and operate a new transmission segment, upgrade an existing line segment, and expand three substation facilities between the Palo Verde Hub Substation near the community of Arlington and the Electrical District 5 (ED5) Substation near Picacho Peak in Maricopa and Pinal Counties, Arizona (the ED-5-PVH Project).The Proposed Action would provide transmission access to a major market hub (PVH) and could enhance the viability of renewable resource development in Pinal

335

EA-1384: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

384: Finding of No Significant Impact 384: Finding of No Significant Impact EA-1384: Finding of No Significant Impact Proposed Improvements at the Thomas Jefferson National Accelerator Facility, Newport News, Virginia DOE evaluated the potential environmental impacts from proposed construction of various site improvements and the proposed installation and operation of the Helios light source at Jefferson Lab. The Southeastern Universities Research Association, Inc. operates Jefferson Lab (SURA) under contract to the DOE. With this proposal, DOE intends to construct no more than four major two or three story additions to CEBAF Center, the main facility administration building, and the addition of three new single story and one two story operations support structures on the accelerator site. The proposed action also involves the installation and operation of

336

EA-1381: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1381: Finding of No Significant Impact Atlas Relocation and Operation at the Nevada Test Site The National Nuclear Security Administration (NNSA) prepared an Environmental Assessment (EA) (DOEIEA-1381) to analyze the proposed action to relocate the Atlas pulse power machine from Los Alamos National Laboratory (LANL) to the Nevada Test Site (NTS). At the NTS, Atlas would be reassembled in a newly constructed building within a designated Industrial, Research, and Support site in Area 6. After reassembly, Atlas would be commissioned to ensure proper operation and then used to conduct approximately 40 pulsed power experiments per year, with a potential to increase to approximately 100 experiments per year, should the Stockpile

337

EA-1602: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

602: Finding of No Significant Impact 602: Finding of No Significant Impact EA-1602: Finding of No Significant Impact Alternative Intake Project Transmission Line and Interconnection, California This notice provides Western Area Power Administration's National Environmental Poilcy Act determination regarding Western's proposal to provide an electric transmission line and interconnection to Contra Costa Water District's Alternative Intake Project (AIP) located in the Sacramento-San Joaquin Delta, within San Joaquin and Contra Costa Counties, California. Under the Proposed Action, Western a would provide electric service to the AIP power substation for operating AIP project facilities, including the new pump station on Victoria Canal, while minimizing costs and environmental effects. Transmission Line and Interconnection to Contra Costa Water District's

338

EA-1363: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1363: Finding of No Significant Impact EA-1363: Finding of No Significant Impact EA-1363: Finding of No Significant Impact Joint Environmental Assessment 2002-2006 of the California Department Of Food and Agriculture Curly Top Virus Control Program for Bureau Of Land Management and Department Of Energy The purpose of the "Proposed Action" is to control the sugar beet leafhopper, Circulifer tenellus (Baker), the only known vector of CTV. Without the control of BLH, the CTV would threaten well over three billion dollars of susceptible crops and home gardens. With only a 1% loss from CTV in California, it is estimated that during the period 1974-1976, California suffered annual losses of $9.75 million in commercial crops alone. A $2.68 million loss in home gardens can be extrapolated from a 1974 value of

339

ADOPTION OF ENVIRONMENTAL ASSESSMENT and FINDING OF NO SIGNIFICANT IMPACT;  

Broader source: Energy.gov (indexed) [DOE]

ADOPTION OF ENVIRONMENTAL ASSESSMENT and FINDING OF NO SIGNIFICANT IMPACT; ADOPTION OF ENVIRONMENTAL ASSESSMENT and FINDING OF NO SIGNIFICANT IMPACT; DETERMINATION OF NO SIGNIFICANT IMPACT DOE/EA-1868: MANHATTAN PROJECT SITES Los Alamos, New Mexico; Hanford, Washington; Oak Ridge, Tennessee; Dayton, Ohio BACKGROUND: 'The National Park Service (NPS) issued an Environmental Assessment (September 2010) in consultation with DOE for a proposed action of recommending that Congress authorize an innovative Manhattan Project National Historical Park. The Park Service selected an alternative for the proposed park that includes publicly and privately owned facilities in Oak Ridge, Tennessee; Los Alamos, New Mexico; and the Hanford, Washington area. 'The boundaries of the national historical park would be defined by enabling legislation and refined by the general management planning

340

EA-1829: Final Environmental Assessment and Finding of No Significant  

Broader source: Energy.gov (indexed) [DOE]

EA-1829: Final Environmental Assessment and Finding of No EA-1829: Final Environmental Assessment and Finding of No Significant Impact EA-1829: Final Environmental Assessment and Finding of No Significant Impact Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI (November 2011) For more information, contact: Mr. Jesse Garcia, NEPA Document Manager U.S Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road, P.O. Box 880 Morgantown, WV 26507-0880 Telephone: 304-285-0256 Fax: 302-285-4403 Electronic mail: Jesse.Garcia@netl.doe.gov DOE completed its Final Environmental Impact Statement for the Phycal Algae Pilot Project,Wahiawa and Kalaeloa, HI (DOE/EA-1829). Based on the analyses in the environmental assessment, DOE determined that there would be no significant adverse impacts on DOE's proposed action of

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EA-1367: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1367: Finding of No Significant Impact White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam, Washington Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release strategies. Actions will take place in the following Columbia River

342

Ethics to guide environmental action  

Science Journals Connector (OSTI)

Ethics to guide environmental action ... "Environmental Ethics: Choices for Concerned Citizens" is advertised as "a timely guide" for persons wanting "a balanced yet ecologically conscious life-style." ...

1980-12-08T23:59:59.000Z

343

EA-1923: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1923: Mitigation Action Plan Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This Mitgation Action Plan specifies the methods for implementing mitigation measures that address the potential environmental impacts identified in DOE/EA-1923 and by the USFWS Biological Opinion issued to DOE on February 1, 2012, in accordance with the Endangered Species Act (ESA) (16 U.S.C.1531 et seq.). The development of these measures and an implementation plan, are a necessary condition for the DOE FONSI, as described by 40 CFR 1021.331(b) Mitigation action plans. EA-1923-MAP-2013 More Documents & Publications EA-1923: Final Environmental Assessment EA-1923: Draft Environmental Assessment EA-1923: Mitigated Finding of No Significant Impact

344

Mitigation Action Implementation Network (MAIN) | Open Energy Information  

Open Energy Info (EERE)

Mitigation Action Implementation Network (MAIN) Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Mitigation Action Implementation Network (MAIN) Year founded 2011 Website http://www.ccap.org/index.php? References MAIN[1] LinkedIn Connections "CCAP is working in collaboration with the World Bank Institute (WBI) and INCAE Business School to support the design and implementation of Nationally Appropriate Mitigation Actions (NAMAs) and Low-Carbon Development (LCD) strategies in developing countries through regionally based dialogues, web-based exchanges, and practitioner networks. Recent UNFCCC negotiations have made it clear that climate protection will depend on actions on the ground in both developing and developed countries. In recent years, developing countries have shown a significant commitment to

345

Significance of gauge line error in orifice measurement  

SciTech Connect (OSTI)

Pulsation induced gauge line amplification can cause errors in the recorded differential signal used to calculate flow. Its presence may be detected using dual transmitters (one connected at the orifice taps, the other at the end of the gauge lines) and comparing the relative peak to peak amplitudes. Its affect on recorded differential may be determined by averaging both signals with a PC based data acquisition and analysis system. Remedial action is recommended in all cases where amplification is detected. Use of close connect, full opening manifolds, is suggested to decouple the gauge lines` resonant frequency from that of the excitation`s, by positioning the recording device as close to the process signal`s origin as possible.

Bowen, J.W. [ANR Pipeline Co., Detroit, MI (United States)

1995-12-01T23:59:59.000Z

346

In support of null hypothesis significance testing  

Science Journals Connector (OSTI)

...support of null hypothesis significance testing Michael Mogie Centre for Mathematical...levelled at null hypothesis significance testing (NHST). It is argued here that although...hypothesis. null hypothesis significance testing|p-value|confidence intervals| In...

2004-01-01T23:59:59.000Z

347

Vehicle Technologies Office: ACEM Instrument Achieves Significant  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ACEM Instrument Achieves ACEM Instrument Achieves Significant Performance Milestone to someone by E-mail Share Vehicle Technologies Office: ACEM Instrument Achieves Significant Performance Milestone on Facebook Tweet about Vehicle Technologies Office: ACEM Instrument Achieves Significant Performance Milestone on Twitter Bookmark Vehicle Technologies Office: ACEM Instrument Achieves Significant Performance Milestone on Google Bookmark Vehicle Technologies Office: ACEM Instrument Achieves Significant Performance Milestone on Delicious Rank Vehicle Technologies Office: ACEM Instrument Achieves Significant Performance Milestone on Digg Find More places to share Vehicle Technologies Office: ACEM Instrument Achieves Significant Performance Milestone on AddThis.com... ACEM Instrument Achieves Significant Performance Milestone

348

Core Competency Worksheets for Significant Cybersecurity Roles...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Core Competency Worksheets for Significant Cybersecurity Roles Core Competency Worksheets for Significant Cybersecurity Roles The OCIO has developed core competency worksheets for...

349

Surface water drainage system. Environmental assessment and finding of no significant impact  

SciTech Connect (OSTI)

This Environmental Assessment (EA) is written pursuant to the National Environmental Policy Act (NEPA). The document identifies and evaluates the action proposed to correct deficiencies in, and then to maintain, the surface water drainage system serving the Department of Energy`s Rocky Flats Environmental Technology Site (Site), located north of Golden, Colorado. Many of the activities proposed would not normally be subject to this level of NEPA documentation. However, in many cases, maintenance of the system has been deferred to the point that wetlands vegetation has become established in some ditches and culverts, creating wetlands. The proposed activities would damage or remove some of these wetlands in order to return the drainage system to the point that it would be able to fully serve its intended function - stormwater control. The Department of Energy (DOE) regulations require that activities affecting environmentally sensitive areas like wetlands be the subject of an EA. Most portions of the surface water drainage system are presently inadequate to convey the runoff from a 100-year storm event. As a result, such an event would cause flooding across much of the Site and possibly threaten the integrity of the dams at the terminal ponds. Severe flooding would not only cause damage to facilities and equipment, but could also facilitate the transport of contaminants from individual hazardous substance sites (IHSSs). Uncontrolled flow through the A- and B-series ponds could cause contaminated sediments to become suspended and carried downstream. Additionally, high velocity flood flows significantly increase erosion losses.

NONE

1996-05-01T23:59:59.000Z

350

EA-1292: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE has determined that the proposed action to use the listed treatment processes at the Rocky Flats Environmental Technology Site does not constitute a major Federal action...

351

Action Plan UNIVERSITY OF MISSOURI  

E-Print Network [OSTI]

Energy, Energy Economics and Policy, and Energy-related Commercialization & Business Development. Other, transportation will play a larger role in its greenhouse gas profile. The Climate Action Plan recommends sustain- ability plan. While the initial Climate Action Plan focuses primarily on greenhouse gas emissions

Taylor, Jerry

352

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network [OSTI]

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

353

An Analysis of the Supreme Courts Reliance on Racial 'Stigma' as a Constitutional Concept in Affirmative Action Cases  

E-Print Network [OSTI]

This article addresses one of the asserted costs of affirmative action: stigmatization. The article offers structure to the debate over the definition and constitutional significance of the concept of stigmatization in the affirmative action...

Halaby, Andrew F.; McAllister, Stephen R.

1997-01-01T23:59:59.000Z

354

June 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Page 1 June 2006 Page 1 June 2006 Technical Standards Program Manager's Note 1 Safety for Electrical Workers 2 Significant Federal Laws and Policies 3 Clearance of Solid Materials from Nuclear Facilities 5 Technical Standards Manager Spotlight 6 Topical Committee Developments 7 From the ANSI Web site 8 Don't Get "Board" With

355

Finding of No Significant Impact for teh Uranium Leasing Program  

Broader source: Energy.gov (indexed) [DOE]

Uranium Leasing Program Uranium Leasing Program July 2007 U.S. Department of Energy Office of Legacy Management FONSI for the ULP 1 July 2007 U.S. DEPARTMET OF ENERGY OFFICE OF LEGACY MANAGEMENT FINDING OF NO SIGNIFICANT IMPACT for the URANIUM LEASING PROGRAM PROGRAMMATIC ENVIRONMENTAL ASSESSMENT Agency: Department of Energy Action: Finding of No Significant Impact Summary: In accordance with the National Environmental Policy Act (NEPA) of 1969 (Title 42 United States Code [U.S.C.] 4321 et seq.) and the Council on Environmental Quality (CEQ), the U.S. Department of Energy Office of Legacy Management (DOE) prepared the Uranium Leasing Program Programmatic Environmental Assessment (PEA) (DOE/EA-1535) to evaluate its management alternatives for the future of DOE's Uranium Leasing Program (ULP). The ULP

356

Action Item Review and Status  

Broader source: Energy.gov (indexed) [DOE]

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

357

Do good actions inspire good actions in others?  

E-Print Network [OSTI]

Actions such as sharing food and cooperating to reach a common goal have played a fundamental role in the evolution of human societies. These good actions may not maximise the actor's payoff, but they maximise the other's payoff. Consequently, their existence is puzzling for evolutionary theories. Why should you make an effort to help others, even when no reward seems to be at stake? Indeed, experiments typically show that humans are heterogeneous: some may help others, while others may not. With the aim of favouring the emergence of 'successful cultures', a number of studies has recently investigated what mechanisms promote the evolution of a particular good action. But still little is known about if and how good actions can spread from person to person. For instance, does being recipient of an altruistic act increase your probability of being cooperative with others? Plato's quote, 'Good actions give strength to ourselves and inspire good actions in others', suggests that is possible. We have conducted an e...

Capraro, Valerio

2014-01-01T23:59:59.000Z

358

EA-1326: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

326: Finding of No Significant Impact 326: Finding of No Significant Impact EA-1326: Finding of No Significant Impact Tucannon River Spring Chinook Captive Broodstock Program, Lyons Ferry, Washington Development of the hydropower system (dams and generators to make electricity) in the Columbia River Basin has had far reaching effects on many species of fish and wildlife. The Bonneville Power Administration (BPA) is responsible for protecting, mitigating, and enhancing fish and wildlife affected by the development, operation, and management of hydroelectric facilities on the Columbia River and its tributaries. In addition, BPA is responsible for protecting and conserving listed Threatened and Endangered speciesunder the Endangered Species Act (ESA) of 1973. One of the measures recommended to help mitigate for anadromous fish

359

ICDF Complex Remedial Action Report  

SciTech Connect (OSTI)

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

360

Recapping National Energy Action Month  

Broader source: Energy.gov [DOE]

Energy Department officials spent National Energy Action Month on the road, meeting and learning from Americans who are advancing our energy security, growing the economy and protecting the environment.

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Microsoft Word - Updated Proposed Action 2004 SA.doc  

Broader source: Energy.gov (indexed) [DOE]

December 27, 2004 December 27, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE/EIS-0312/SA-01) Sarah McNary Senior Policy Advisor Proposed Action: Updated Proposed Action (UPA) for the FCRPS Biological Opinion Remand Location: The action area of the UPA, including areas where the UPA directly or indirectly affects listed salmonids consists of the following areas: * The mainstem Columbia River, including and downstream of Libby and Hungry Horse dams and reservoirs; the Snake River below the confluence with the Salmon River; and the Clearwater River below Dworshak reservoir and dam, down to and including the Columbia River estuary and plume. * The estuary and plume, which includes the area immediately off the mouth of the Columbia

362

DOE Announces Additional Energy Efficiency Enforcement Action to Protect  

Broader source: Energy.gov (indexed) [DOE]

Additional Energy Efficiency Enforcement Action to Additional Energy Efficiency Enforcement Action to Protect Consumers DOE Announces Additional Energy Efficiency Enforcement Action to Protect Consumers January 7, 2010 - 12:00am Addthis Washington, DC - The Department of Energy announced today that it has entered into a Consent Decree with Haier America resolving an investigation into whether Haier violated DOE's energy efficiency standards. DOE's investigation led Haier to determine that a parts defect caused certain freezers to consume more energy than represented to consumers and possibly violated DOE's energy efficiency standards and the ENERGY STAR® requirements for freezers. As part of the Obama Administration's commitment to enforcing energy efficiency, this Consent Decree obligates Haier to notify affected consumers, repair defective units, and pay a

363

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network [OSTI]

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

364

EA-1755: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1755: Mitigation Action Plan Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico EA prepared for the proposed reconstruction of the Waste Isolation Pilot Plant (WIPP) South Access Road (County Road 802) located in Eddy County, New Mexico. Through the environmental review process, the Bureau of Land Management Carlsbad Field Office (BLM CFO) determined that there would be potential environmental impacts from the proposed project that would require mitigation to assure that the impacts would not become significant. Therefore, the Department of Energy Carlsbad Field Office (CBFO) prepared this Mitigation Action Plan (MAP) to establish conditions for issuing its

365

US-China Partnership for Climate Action | Open Energy Information  

Open Energy Info (EERE)

US-China Partnership for Climate Action US-China Partnership for Climate Action Jump to: navigation, search Name US-China Partnership for Climate Action Agency/Company /Organization Institute for Sustainable Communities (ISC), World Resources Institute (WRI) Sector Climate, Energy Focus Area Non-renewable Energy, Greenhouse Gas, Industry Topics Background analysis Website http://www.iscvt.org/where_we_ Program Start 2009 Country China, United States Eastern Asia, Northern America References http://www.iscvt.org/where_we_work/china/ "In the fall of 2009, Institute for Sustainable Communities (ISC) launched the US-China Partnership for Climate Action (PCA)[1] with its partner, the World Resources Institute (WRI). This program will leverage resources and best practices from both countries to achieve significant and lasting

366

EA-1440: Mitigation Action Plan | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

440: Mitigation Action Plan 440: Mitigation Action Plan EA-1440: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex The Department of Energy has issued a Supplemental Environmental Assessment and has prepared a Finding of No Significant Impact for three site development projects at the National Renewable Energy Laboratory's South Table Mountain site at Golden, Colorado. 1) Construction of the Research Support Facilities, a new office building or multi-building office complex; 2) Installation of phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); and 3) Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant. Mitigation Action Plan for the Supplement to the Final Site-Wide

367

Document Number Q0029500 Significant Activities  

Office of Legacy Management (LM)

Significant Activities Significant Activities 2.0 Significant Activities Since Preparation of the 1998 RI Document Since data collection for the purposes of preparing the 1998 RI report ended in 1996, several significant activities have occurred on the Millsite and surrounding peripheral properties. The following subsections provide a brief description of these activities. At the conclusion of each subsection, a summary indicates whether the described activity invalidates or results in significant changes to the assumptions used in the ground water model and the human health and ecological risk assessments presented in the 1998 RI. If significant changes have resulted, general statements describe how the new conditions are accounted for in the RI AddendumFFS. This information is also assembled in an overall summary (Section 2.9) that lists

368

Finding of no significant impact: Changes in the sanitary sludge land application program on the Oak Ridge Reservation, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1042) that evaluates potential impacts of proposed changes in the sanitary sludge land application program on the DOE Oak Ridge Reservation (ORR), Oak Ridge, Tennessee. Changes in lifetime sludge land application limits and radionuclide loading are proposed, and two new sources of sewage sludge from DOE facilities would be transported to the City of Oak Ridge Publicly Owned Treatment Works (COR POTW). Lifetime sludge land application limits would increase from 22 tons/acre to 50 tons/acre, which is the limit approved and permitted by the Tennessee Department of Environment and Conservation (TDEC). With the approval of TDEC, the permissible radiological dose from sludge land application would change from the current limit of 2x background radionuclide concentrations in receiving soils to a risk-based dose limit of 4 millirem (mrem) per year for the maximally exposed individual. Sludge land application sites would not change from those that are currently part of the program. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this Finding of No Significant Impact (FONSI). 70 refs., 2 figs., 17 tabs.

NONE

1996-10-01T23:59:59.000Z

369

EIS-0425: Record of Decision and Mitigation Action Plan | Department of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5: Record of Decision and Mitigation Action Plan 5: Record of Decision and Mitigation Action Plan EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental Impact Statement (EIS) (DOE/EIS-0425, March 2012). BPA will fund the construction, operation, and maintenance of a coho slamon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action will involve building a new, small, in-basin adult

370

Sandia National Laboratories: International Smart Grid Action...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Smart Grid Action Network Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration,...

371

Energy Agency Coordinators for Energy Action Month  

Broader source: Energy.gov [DOE]

Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

372

Commercial Building HVAC: How it Affects People  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commercial Building HVAC: How it Affects People Commercial Building HVAC: How it Affects People Speaker(s): William Fisk Date: November 13, 2000 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: David Faulkner Commercial building heating, ventilating, and air conditioning (HVAC) systems are designed primarily to maintain a reasonable level of thermal comfort while limiting first costs and energy consumption. However, research conducted predominately within the last decade suggests that commercial building HVAC significantly influences human outcomes other than thermal comfort, including the health, satisfaction, and work performance of the building's occupants. This presentation will review the relationships of these outcomes with HVAC system type, filtration system efficiency, indoor air temperature, and outside air ventilation rate.

373

Assessing the significance of sets of words  

Science Journals Connector (OSTI)

Various criteria have been defined to evaluate the significance of sets of words, the computation of them often being difficult. We provide explicit expressions for the waiting time in such a context. In order to assess the significance of a cluster ...

Valentina Boeva; Julien Clment; Mireille Rgnier; Mathias Vandenbogaert

2005-06-01T23:59:59.000Z

374

U S . DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT  

Broader source: Energy.gov (indexed) [DOE]

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT AREA 5 RADIOACTIVE WASTE MANAGEMENT SITE (RWMS) A C ~ S S IMPROVEh&NT AT NEv&A TEST S I m (Nh) The United States Department of Energy has prepared an Environmental Assessment (DOEIEA-1170) (EA) which analyzes the potential environmental effects of improving access to its Area 5 RWMS at the NTS. The EA ev,duatks the ~otential imacts of construct in^ an Springs Road betiveen Mercury kghway &the 5-01 Road. Thke also evaluated: (1) Construction of a new road along the existing I alignment of the Powerline Road between Mercury Highway and the 5-01 Road, ( 2 ) u p - g the existing 5-01 Road, and (3) taking no action. The purpose and need for improving access to the RWMS are addressed in Section 1

375

Definition: Corrective Action Plan | Open Energy Information  

Open Energy Info (EERE)

Corrective Action Plan Corrective Action Plan Jump to: navigation, search Dictionary.png Corrective Action Plan A list of actions and an associated timetable for implementation to remedy a specific problem.[1] View on Wikipedia Wikipedia Definition Corrective action and preventive action (CAPA, also called corrective action / preventive action) are improvements to an organization's processes taken to eliminate causes of non-conformities or other undesirable situations. CAPA is a concept within good manufacturing practice (GMP). It focuses on the systematic investigation of the root causes of non-conformities in an attempt to prevent their recurrence (for corrective action) or to prevent occurrence (for preventive action). Corrective actions are implemented in response to customer complaints,

376

Practical Action | Open Energy Information  

Open Energy Info (EERE)

Action Action Jump to: navigation, search Logo: Practical Action Name Practical Action Address The Schumacher Centre for Technology & Development, Bourton on Dunsmore, Rugby, Warwickshire Place Rugby, Warwickshire Zip CV21 1UB Phone number 01926 634400 Notes Practical Action works alongside communities to find practical solutions to the poverty they face. Website http://www.practicalaction.org Coordinates 52.3910875°, -1.2339112° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.3910875,"lon":-1.2339112,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

377

Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for the CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The site will be investigated based on the data quality objectives (DQOs) developed on July 6, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for the Baneberry site. The primary release associated with Corrective Action Unit 365 was radiological contamination from the Baneberry nuclear test. Baneberry was an underground weapons-related test that vented significant quantities of radioactive gases from a fissure located in close proximity to ground zero. A crater formed shortly after detonation, which stemmed part of the flow from the fissure. The scope of this investigation includes surface and shallow subsurface (less than 15 feet below ground surface) soils. Radionuclides from the Baneberry test with the potential to impact groundwater are included within the Underground Test Area Subproject. Investigations and corrective actions associated with the Underground Test Area Subproject include the radiological inventory resulting from the Baneberry test.

Patrick Matthews

2010-12-01T23:59:59.000Z

378

EA-1262: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA, DOE has determined that the proposed action to extend the McKay Bypass Canal at the Rocky Flats Environmental Technology Site does not constitute a major Federal action...

379

Experimental Philosophy and Philosophical Significance Joshua Knobe  

E-Print Network [OSTI]

Experimental Philosophy and Philosophical Significance Joshua Knobe University of North Carolina Chapel Hill (Forthcoming in Philosophical Explorations) The phrase `experimental philosophy' refers's ordinary intuitions. It is now generally agreed that research in experimental philosophy has led

Knobe, Joshua

380

CLIMATE ACTION PLAN JUNE 1, 2010  

E-Print Network [OSTI]

UC DAVIS 2009­2010 CLIMATE ACTION PLAN JUNE 1, 2010 #12;UC Davis 2009-2010 Climate Action Plan Page 2 UC DAVIS 2009-2010 CLIMATE ACTION PLAN TABLE OF CONTENTS Acknowledgements...................................................................................................... 24 Chapter 3: Emissions Reduction Actions 3.1 Energy Use Reduction to Date

Schladow, S. Geoffrey

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

U.S. Department of Energy Finding of No Significant Impact APPEDIX A  

Broader source: Energy.gov (indexed) [DOE]

Impact Impact APPEDIX A FINDING OF NO SIGNIFICANT IMPACT 242-A EVAPORATOR HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY February 2010 A-i February 20 10 U.S. Department of Energy Finding of No Significant Impact This page intentionally left blank. A-ii February 20 10 U.S. Department of Energy Finding of No Significant Impact AGENCY: The U.S. Department of Energy. ACTION: Finding of No Significant Impact. SUMMARY: The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA- 1682, Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act (ARRA) of 2009 . The proposed actions analyzed in the EA are within the scope of the recently issued draft Tank Closure & Waste Management Environmental Impact Statement

382

The United States has significant natural gas  

Broader source: Energy.gov (indexed) [DOE]

United States has significant natural gas United States has significant natural gas and oil reserves. But many of these resources are increasingly harder to locate and bring into production. To help meet this challenge, the U.S. Department of Energy's Office of Fossil Energy over the years has amassed wide ranging expertise in areas related to deepwater resource location, production, safety and environmental protection. The goal of these activities has been to not only help overcome

383

Inflammatory Myofibroblastic Tumors Harbor Multiple Potentially Actionable Kinase Fusions  

Science Journals Connector (OSTI)

...presence of a ROS1 kinase fusion within his tumor. On...first time that kinase fusions are found in the majority...this disease but also provide a rationale for routine...therapeutically actionable kinase fusions and thereby offer patients...significantly increased energy. Imaging studies revealed...

Christine M. Lovly; Abha Gupta; Doron Lipson; Geoff Otto; Tina Brennan; Catherine T. Chung; Scott C. Borinstein; Jeffrey S. Ross; Philip J. Stephens; Vincent A. Miller; and Cheryl M. Coffin

2014-08-01T23:59:59.000Z

384

M-Area Hazardous Waste Management Facility groundwater monitoring and corrective-action report. Second quarter 1995, Volume 1  

SciTech Connect (OSTI)

This report describes the corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site during second quarter 1995. Topics include: changes in sampling, analysis, and reporting; water levels; remedial action of groundwater; and hydrology of the affected aquifer zones.

NONE

1995-08-01T23:59:59.000Z

385

Climate Change Action Plan Report  

E-Print Network [OSTI]

Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

Hansen, Andrew J.

386

Know the symptoms. Take action.  

E-Print Network [OSTI]

1 " " Know the symptoms. Take action. heart attack c a l l Don't Take a Chance With a Heart Attack: Know the Facts and Act Fast More than 1 million people in the United States have heart attacks each attack happens, delay in treatment can be deadly. Learn the warning symptoms of a heart attack, and know

Bandettini, Peter A.

387

Know the symptoms. Take action.  

E-Print Network [OSTI]

heart attack Know the symptoms. Take action. c a l l Important Information Fill out the next two:____________________________ Home phone:_______________________ Work phone: ________________________ December 2011 #12;Heart Attack might be having heart attack symptoms or a heart attack, call 9­1­1 immediately. Don't ignore your pain

Bandettini, Peter A.

388

CLIMATE ACTION PLAN SEPTEMBER 2009  

E-Print Network [OSTI]

· ALBUQUERQUE, NEW MEXICO #12;#12;The University of New Mexico is committed to reducing energy usage and ourCLIMATE ACTION PLAN SEPTEMBER 2009 UNIVERSITY OF NEW MEXICO · OFFICE OF SUSTAINABILITY ................................ 18 C. Electricity Recommendation #1 Solar........... 21 D. Electricity Recommendation #2 Smart Grid

Maccabe, Barney

389

Climate Action Champions Informational Webinar  

Broader source: Energy.gov [DOE]

An informational webinar will be held on Thursday, Oct. 9 from 1:00 p.m. - 3:00 p.m. Eastern Standard Time (EST) to provide applicants with an overview of the Climate Action Champions opportunity, the application process, and answer any questions.

390

Compromise strategies for action selection  

Science Journals Connector (OSTI)

...10.1098/rstb.2007.2051 Howard, R 1977Risk preferenceIn Readings in decision analysisMenlo Park, CA:SRI International Humphrys, M. 1996 Action selection methods using reinforcement learning. PhD thesis, University of Cambridge...

2007-01-01T23:59:59.000Z

391

Idaho Cleanup Contractor Surpasses Significant Safety Milestones |  

Broader source: Energy.gov (indexed) [DOE]

Cleanup Contractor Surpasses Significant Safety Milestones Cleanup Contractor Surpasses Significant Safety Milestones Idaho Cleanup Contractor Surpasses Significant Safety Milestones April 29, 2013 - 12:00pm Addthis CWI employees discuss safety procedures before they remove a spent nuclear fuel shipment from a shipping container. CWI employees discuss safety procedures before they remove a spent nuclear fuel shipment from a shipping container. IDAHO FALLS, Idaho - For the second time in a little over a year, employees with DOE contractor CH2M-WG Idaho (CWI) supporting EM at the Idaho site have achieved 1 million hours without a recordable injury. They also worked more than 1.7 million hours without a lost work-time injury. "Our focus is working with employees to keep each other safe," said CWI Environmental, Safety, and Health Vice President Kevin Daniels. "We

392

Office of Legacy Management Significant Environmental Aspects  

Broader source: Energy.gov (indexed) [DOE]

9/2013 9/2013 Office of Legacy Management Significant Environmental Aspects The mission of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is to safely manage DOE's postclosure responsibilities and ensure the future protection of human health and the environment. We have evaluated all of our activities for their potential impact on the environment, and we have identified those aspects that could have a significant impact if they were not controlled. This information is used to develop programs to prevent or mitigate potential impacts and to establish prioritized goals, objectives, and targets for continually improving performance. Our significant environmental aspects fall into four categories: * Waste generation and minimization

393

Complex Forces Affect China's Biodiversity  

E-Print Network [OSTI]

global efforts have been put into biodiversity conservation, but biodiversity loss continues rapidly in biodiversity conservation to the global level and help protect biodiversity in other developing countries Wiley & Sons, Ltd. #12;208 ConservationBiology COMPLEXITY OF INTERACTING FORCES AFFECTING BIODIVERSITY

394

E-Print Network 3.0 - affective lability scale Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to the author for internal non-commercial research Summary: not significantly affected by warming. For all measured pools, only labile and microbial biomass C fractions...

395

Core Competency Worksheets for Significant Cybersecurity Roles  

Broader source: Energy.gov [DOE]

OCIO has developed core competency worksheets for significant cyber roles to assist training personnel, curricula developers, supervisors, etc. with identifying core skills needed to perform their functional roles. Core competencies can be used to develop training objectives for site or organization-specific role-based training.

396

Investigating the book-tax income gap : factors which affect the gap and details regarding its most significant component  

E-Print Network [OSTI]

(cont.) In total, my thesis suggests that recent changes in the book-tax income gap may be exogenous and transitory, due to changes to the calculation of book income, general business conditions or other factors which ...

Seidman, Jeri

2008-01-01T23:59:59.000Z

397

Action  

National Nuclear Security Administration (NNSA)

and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http: www,nrc.govreading-rmadams.htmI. Persons who do not have access to...

398

A dynamic evolution model of human opinion as affected by advertising  

Science Journals Connector (OSTI)

Abstract We propose a new model to investigate the dynamics of human opinion as affected by advertising, based on the main idea of the CODA model and taking into account two practical factors: one is that the marginal influence of an additional friend will decrease with an increasing number of friends; the other is the decline of memory over time. Simulations show several significant conclusions for both advertising agencies and the general public. A small difference of advertisings influence on individuals or advertising coverage will result in significantly different advertising effectiveness within a certain interval of value. Compared to the value of advertisings influence on individuals, the advertising coverage plays a more important role due to the exponential decay of memory. Meanwhile, some of the obtained results are in accordance with peoples daily cognition about advertising. The real key factor in determining the success of advertising is the intensity of exchanging opinions, and peoples external actions always follow their internal opinions. Negative opinions also play an important role.

Gui-Xun Luo; Yun Liu; Qing-An Zeng; Su-Meng Diao; Fei Xiong

2014-01-01T23:59:59.000Z

399

Missouri State information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

400

Ecuador-Quito City Climate Change Action Plan | Open Energy Information  

Open Energy Info (EERE)

Ecuador-Quito City Climate Change Action Plan Ecuador-Quito City Climate Change Action Plan Jump to: navigation, search Name Ecuador-Quito City Climate Change Action Plan Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://resilient-cities.iclei. Country Ecuador UN Region South America References CDKN-Ecuador-Quito City Climate Change Action Plan[1] Ecuador-Quito City Climate Change Action Plan Screenshot In the last 100 years, Quito has experienced an average temperature increase of 1.2°C to 1.4°C. The change in the city's climate patterns affects ecosystems, infrastructure, water availability, human health,

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

CDKN-Ecuador-Quito City Climate Change Action Plan | Open Energy  

Open Energy Info (EERE)

Quito City Climate Change Action Plan Quito City Climate Change Action Plan Jump to: navigation, search Name CDKN-Ecuador-Quito City Climate Change Action Plan Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://resilient-cities.iclei. Country Ecuador UN Region South America References CDKN-Ecuador-Quito City Climate Change Action Plan[1] CDKN-Ecuador-Quito City Climate Change Action Plan Screenshot In the last 100 years, Quito has experienced an average temperature increase of 1.2°C to 1.4°C. The change in the city's climate patterns affects ecosystems, infrastructure, water availability, human health,

402

Nome, Alaska, Wind Turbine Demonstration Project Finding of No Significant Impact  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact Nome, Alaska, Wind Turbine Demonstration Project FINDING OF NO SIGNIFICANT IMPACT S U M M A R Y The U.S. Department of Energy (DOE) has prepared this Environmental Assessment (EA) to provide DOE and other public agency decision makers witb tbe environmental documentation required to take informed discretionary action on the proposed Nome, Alaska, Wind Turbine Demonstration Project (DOE/EA-1280). The EA assesses the potential environmental impacts and cumulative i m p a c t s that would result from the jnstallation and operation of wind turbines in Nome, Alaska DOE'S role in the proposed action would be limited to providing ,$ding assistance for a portion of the construction and demonstration of wind energy technology in the

403

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD  

Broader source: Energy.gov (indexed) [DOE]

FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD WITHIN THE IDAHO NATIONAL LABORATORY SITE (EM-FMDP-I0-068) Agency: U. S. Department of Energy (DOE) Action: Finding of No Significant Impact (FONSI) Summary: The DOE prepared a Draft Environmental Assessment (EA) for the proposed "Environmental Assessment for the Multipurpose Haul Road Within the Idaho National Laboratory Site" (DOE/EA-I772). The proposed action consists of constructing a road for limited year-round use with the ability for trucks traveling in opposite directions to pass. The analysis of the proposed road evaluates clearing and grading a base, installing necessary culverts and drainage, and placing and compacting gravel for the roadway. The haul road would be used to:

404

Emergencies and Emergency Actions | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Emergencies and Emergency Actions Emergencies and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. September 8, 2005 Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina;

405

National Action Plan on Demand Response  

Broader source: Energy.gov (indexed) [DOE]

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

406

Chicago Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Action Plan Action Plan Jump to: navigation, search Name Chicago Climate Action Plan Agency/Company /Organization City of Chicago Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Prepare a Plan Topics Low emission development planning Resource Type Case studies/examples Availability Free Website http://www.chicagoclimateactio Locality Chicago, IL References Chicago Climate Action Plan[1] Overview Chicago's Climate Action Plan addresses both mitigation of and adaptation to climate change and encompasses the entire city (rather than only City operations). The plan contains a high-level overview of Chicago's climate action initiatives, including 26 mitigation strategies and nine adaptation

407

Enforcement Action EA 98-12  

Broader source: Energy.gov (indexed) [DOE]

6, 1998 6, 1998 Mr. Peyton S. Baker [ ] Babcock & Wilcox of Ohio, Inc. 1 Mound Road Miamisburg, Ohio 45343-3030 EA 98-12 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty - $165,000 (NTS-OH-MB-BWO-BWO04-1998-0001, NTS-OH-MB-BWO-BWO04-1998-0002, and NTS-OH-MB-BWO-BWO06-1998-0001) Dear Mr. Baker: This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning a number of significant deficiencies in Babcock & Wilcox of Ohio, Inc., (BWO) radiological work controls and bioassay program at the DOE Mound Site and its corrective actions to remedy those deficiencies. DOE initiated an investigation in March 1998 for the radiological work control deficiencies

408

Microsoft Word - Significant Environmental Aspects_2010.doc  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy (DOE) Office of Legacy Management U.S. Department of Energy (DOE) Office of Legacy Management (LM) is to safely manage DOE's post-closure responsibilities and ensure the future protection of human health and the environment. We have evaluated all of our activities for their potential impact on the environment, and we have identified those aspects that could have a significant impact if they were not controlled. This information is used to develop programs to prevent or mitigate potential impacts and to establish prioritized goals, objectives, and targets for continually improving performance. Our significant environmental aspects fall into four categories: * Waste generation and minimization * Resource consumption, use, and storage * Releases to the environment * Land use (including cell construction and maintenance, and structure erection or

409

The Standards Actions, October 1996  

Broader source: Energy.gov (indexed) [DOE]

Actions Actions October 1996 Documents Recently Published The following DOE documents have recently been published: * DOE-SPEC-3018-96, Flooded-Type Lead-Acid Storage Batter- ies, August 1996. * DOE-SPEC-3019-96, Valve- Regulated Type Lead-Acid Storage Batteries, August 1996. * DOE-TSL-1-96, Department of Energy Standards Index, August 1996. * DOE-TSL-4-96, Directory of DOE and Contractor Personnel Involved in Non-Government Standards Activities, August 1996. DOE employees and DOE contractors may obtain copies from the DOE Office of Scientific and Technical Information (OSTI), P.O. Box 62, Oak Ridge, Tennes- see 37831; telephone 423-576-8401 or FAX 423-576-2865. Subcontractors and the general public may obtain copies from the U.S. Department of Commerce, Technology Administration,

410

The Standards Actions, January 1996  

Broader source: Energy.gov (indexed) [DOE]

Actions Actions Resistance of HVAC Air Ducts and Fittings (new standard); comments due February 6, 1996. * ISO/ASQC A3534-1, Statis- tics - Vocabulary and Sym- bols - Probability and Gen- eral Statistical Terms (new standard); comments due January 26, 1996. * ISO/ASTM/ASQC/NSF 14004, Environmental management systems - General guidelines on principles, systems and Technical Standards Program Document Status as of 12/31/95 Documents Recently Published The Technical Standards Program is sponsoring a project at OSTI to place all DOE technical standards (i.e., standards and handbooks) on the Internet. To date, 57 DOE technical standards have been placed on the Internet at the following address: http://apollo.osti.gov/ html/techstds/ techstds.html The following DOE technical standards have recently

411

Action Sheet 36 Final Report  

SciTech Connect (OSTI)

Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

Kips, R E; Kristo, M J; Hutcheon, I D

2012-02-24T23:59:59.000Z

412

Comparing Double String Theory Actions  

E-Print Network [OSTI]

Aimed to a deeper comprehension of a manifestly T-dual invariant formulation of string theory, in this paper a detailed comparison between the non-covariant action proposed by Tseytlin and the covariant one proposed by Hull is done. These are obtained by making both the string coordinates and their duals explicitly appear, on the same foot, in the world-sheet action, so "doubling" the string coordinates along the compact dimensions. After a discussion of the nature of the constraints in both the models and the relative quantization, it results that the string coordinates and their duals behave like "non-commuting" phase space type coordinates but their expressions in terms of Fourier modes generate the oscillator algebra of the standard bosonic string formulation. A proof of the equivalence of the two formulations is given. Furthermore, open-string solutions are also discussed.

Luca De Angelis; S. J. Gabriele Gionti; Raffaele Marotta; Franco Pezzella

2013-12-27T23:59:59.000Z

413

Canada Calls for Triclosan Action  

Science Journals Connector (OSTI)

Canada Calls for Triclosan Action ... The Canadian government is urging industry to voluntarily remove the antibacterial chemical triclosan from consumer products because of concerns about its toxicity to aquatic organisms. ... Although triclosan can still be sold and used in Canada in products such as antibacterial soaps, toothpastes, and deodorants, the government plans to work with companies over the next 18 months to better understand usage patterns and to assess alternatives. ...

BRITT ERICKSON

2012-04-09T23:59:59.000Z

414

Take the Energy Action Challenge  

K-12 Energy Lesson Plans and Activities Web site (EERE)

Students will work in pairs or small groups to apply knowledge of energy-wise habits to evaluate energy use in their homes and schools and make recommendations for improved efficiency. They will use an energy audit tool to collect data on their home and school energy habits and present an action plan to their class. Further communication at the school and district level is encouraged.

415

Spherical Pendulum, Actions, and Spin  

Science Journals Connector (OSTI)

To fill this gap, our research group has worked out energy surfaces in action variable representation, for a number of classical problems:? the Euler, Lagrange, and Kovalevskaya cases of rigid body dynamics,8-10 billiards in ellipsoids,11,12 and particle motion around point masses with Schwarzschild or Kerr metric as well as around two fixed centers. ... These tori are mirror images of each other under the spin transformation P. ...

Peter H. Richter; Holger R. Dullin; Holger Waalkens; Jan Wiersig

1996-12-05T23:59:59.000Z

416

FINDING OF NO SIGNIFICANT IMPACT U.S. DEPARTMENT OF ENERGY CONVEYANCE OF PARCEL ED-6  

Broader source: Energy.gov (indexed) [DOE]

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY CONVEYANCE OF PARCEL ED-6 TO THE CITY OF OAK RIDGE, TENNESSEE AGENCY: U.S. Department of Energy ACTION: Finding of No Significant Impact SUMMARY: The U. S. Department of Energy (DOE) has completed an Environmental Assessment (EA) (DOE/EA-1514) for the proposed conveyance of Parcel ED-6 to the city of Oak Ridge. The need for DOE action is the result of a request from the city of Oak Ridge to convey Parcel ED-6 under 10 Code of Federal Regulations (CFR) 770. The proposed action would also help the city to meet the goals stated in the Oak Ridge City Council's Strategic Plan, The Path Forward: 2003-2007, which identifies the development of new housing as a major initiative. DOE also recognizes that transferring land for local

417

Description of the Formerly Utilized Sites Remedial Action Program  

SciTech Connect (OSTI)

The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

Not Available

1980-09-01T23:59:59.000Z

418

Mechanism of Action of Colchicine in the Treatment of Gout  

Science Journals Connector (OSTI)

AbstractPurpose The aims of this article were to systematically review the literature about the mechanism of action of colchicine in the multimodal pathology of acute inflammation associated with gout and to consider the clinical utility of colchicine in other chronic inflammatory diseases. Methods The English-language literature on PubMed was searched for articles published between 1990 and October 2013, with a cross-reference to citations across all years. Relevant articles pertaining to the mechanism of action of colchicine and the clinical applications of colchicine in gout and other inflammatory conditions were identified and reviewed. Findings The molecular pathology of acute inflammation associated with gouty arthritis involves several concurrent pathways triggered by a variety of interactions between monosodium urate crystals and the surface of cells. Colchicine modulates multiple pro- and antiinflammatory pathways associated with gouty arthritis. Colchicine prevents microtubule assembly and thereby disrupts inflammasome activation, microtubule-based inflammatory cell chemotaxis, generation of leukotrienes and cytokines, and phagocytosis. Many of these cellular processes can be found in other diseases involving chronic inflammation. The multimodal mechanism of action of colchicine suggests potential efficacy of colchicine in other comorbid conditions associated with gout, such as osteoarthritis and cardiovascular disease. Implications Colchicine has multiple mechanisms of action that affect inflammatory processes and result in its utility for treating and preventing acute gout flare. Other chronic inflammatory diseases that invoke these molecular pathways may represent new therapeutic applications for colchicine.

Nicola Dalbeth; Thomas J. Lauterio; Henry R. Wolfe

2014-01-01T23:59:59.000Z

419

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Broader source: Energy.gov (indexed) [DOE]

2/26/2010 2/26/2010 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: Tom Pyke FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 12/22/2009 ACTION REQUESTED: New collection (Request for a new OMB Control Number) TYPE OF REVIEW REQUESTED: Emergency ICR REFERENCE NUMBER: 200912-1910-010 AGENCY ICR TRACKING NUMBER: Jaime Carlson-OE TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 08/31/2010 DISCONTINUE DATE:

420

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Broader source: Energy.gov (indexed) [DOE]

9/30/2010 9/30/2010 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: William Turnbull FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 07/23/2010 ACTION REQUESTED: Extension without change of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201005-1910-005 AGENCY ICR TRACKING NUMBER: Matthew Grosso TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 12/31/2011 DISCONTINUE DATE:

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Broader source: Energy.gov (indexed) [DOE]

1/10/2012 1/10/2012 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: William Turnbull FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 10/13/2011 ACTION REQUESTED: Revision of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201110-1910-001 AGENCY ICR TRACKING NUMBER: Matthew Grosso TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 01/31/2015 DISCONTINUE DATE:

422

Riverland expedited response action proposal  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

423

Analysis of Transportation and Logistics Challenges Affecting...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Transportation and Logistics Challenges Affecting the Deployment of Larger Wind Turbines: Summary of Results Analysis of Transportation and Logistics Challenges Affecting...

424

Massachusetts state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

None

1981-02-09T23:59:59.000Z

425

Florida state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

None

1981-02-27T23:59:59.000Z

426

Oregon state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

427

Maryland State information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

428

Oregon state information handbook formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

429

California state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

none,

1981-02-09T23:59:59.000Z

430

Physical Significance of Operators in Quantum Optics  

Science Journals Connector (OSTI)

The relation between normally ordered and unordered products of creation and annihilation operators is examined, and it is emphasized that the former correspond to counting correlations and the latter to counting moments. Both can be measured. It is shown that there exists a particularly simple relation between the generating functions for the two kinds of products. This relation can also be obtained by semiclassical considerations, which give more insight into its significance. The result provides further indication of the very close connection between the semiclassical and quantum-mechanical theories of optical coherence.

L. Mandel

1964-11-23T23:59:59.000Z

431

Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan  

Broader source: Energy.gov (indexed) [DOE]

United States-Japan Joint Nuclear Energy Action Plan United States-Japan Joint Nuclear Energy Action Plan The United States-Japan Joint Nuclear Energy Action Plan is intended to provide a framework for bilateral collaboration in nuclear energy. This Action Plan builds upon our significant, longstanding civilian nuclear cooperation, and will contribute to increasing energy security and managing nuclear waste, addressing nuclear nonproliferation and climate change, advancing goals put forth in President Bush's Global Nuclear Energy Partnership (GNEP) initiative. The Action Plan was signed by representatives of both nations in April 2007. The Action Plan will be implemented by Steering Committee Co-Chairs. Assistant Secretary of Energy Dennis Spurgeon, or his designee, will serve as the U.S. Co-Chair. Japanese Co-Chairs will be selected

432

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...  

Broader source: Energy.gov (indexed) [DOE]

(Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Boston Massachusetts: Solar in Action (Brochure), Solar America Cities, Energy Efficiency &...

433

EA-1914: Finding of No Significant Impact | Department of Energy  

Office of Environmental Management (EM)

National Wind Technology Center (NWTC) Site-Wide Environmental Assessment, Golden, Colorado Based on the EA and the above considerations, DOE finds that the Proposed Action is...

434

EA-1785: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE determined that its proposed action - awarding a federal grant to Southeast Regional Carbon Sequestration Partnership to inject 125,000 tons of carbon dioxide per year for...

435

EA-1575: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

proposed action evaluated in this Environmental Assessment (EA) is to advance technology transfer and other missions of the U. S. Department of Energy Office of Science at the...

436

FINDING OF NO SIGNIFICANT IMPACT FOR THE COMBINED COMMUNITY COMMUNICAT...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

footprint on ALE, thus improving the landscape and minimizing impacts to existing cultural and biological resources. Implementation of the proposed actions evaluated in...

437

EA-1904: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, CA Based on the findings in the EA, DOE has determined that the proposed action to...

438

Leisure constraints which affect continued nonresident hunter participation  

E-Print Network [OSTI]

thesis research. I am grateful for their time, patience, and good humor. I would like to thank McAllister Maxwell, William Cook, Sara Steen, and Kelly Strnadel for their help preparing survey mailouts, offering advice, and continued support. Jason... not significantly different in the constraints they felt affected their hunting participation. Both groups listed no time due to family or work commitments, high lease cost, and distance as their greatest constraints to hunting in Texas. No significant...

Cook, Kathrine Helen

1994-01-01T23:59:59.000Z

439

VA Energy Management Action Plan  

Broader source: Energy.gov (indexed) [DOE]

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

440

Dynamo action in flows with  

E-Print Network [OSTI]

Dynamo action in flows with cat's eyes A l i c e C o u r v o i s i e r A n d r e w G i l b e r t Y of k for R = 500 and the flow (2.4) and (2.5). nts k = 2.5 and k = 5 are highlighted. Magnetic field). In (a) k = 2.5 and we have 0.5 max Bz (with max Bz 0.6 max |B|), and in (b) k = 5 and the levels .65 max

Li, Yi

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Numerical Tests of the Improved Fermilab Action  

E-Print Network [OSTI]

Recently, the Fermilab heavy-quark action was extended to include dimension-six and -seven operators in order to reduce the discretization errors. In this talk, we present results of the first numerical simulations with this action (the OK action), where we study the masses of the quarkonium and heavy-light systems. We calculate combinations of masses designed to test improvement and compare results obtained with the OK action to their counterparts obtained with the clover action. Our preliminary results show a clear improvement.

C. Detar; A. S. Kronfeld; M. B. Oktay

2010-11-23T23:59:59.000Z

442

Collaborative Creativity: A Complex Systems Model with Distributed Affect  

E-Print Network [OSTI]

Collaborative Creativity: A Complex Systems Model with Distributed Affect Cecilia R. Aragon E16 2RD UK alisonwilliams62@googlemail.com ABSTRACT The study of creativity has received significant attention over the past century, with a recent increase in interest in collaborative, distributed creativity

Anderson, Richard

443

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD WITHIN THE IDAHO NATIONAL LABORATORY SITE (EM-FMDP-I0-068) Agency: U. S. Department of Energy (DOE) Action: Finding of No Significant Impact (FONSI) Summary: The DOE prepared a Draft Environmental Assessment (EA) for the proposed "Environmental Assessment for the Multipurpose Haul Road Within the Idaho National Laboratory Site" (DOE/EA-I772). The proposed action consists of constructing a road for limited year-round use with the ability for trucks traveling in opposite directions to pass. The analysis of the proposed road evaluates clearing and grading a base, installing necessary culverts and drainage, and placing and compacting gravel for the roadway. The haul road would be used to:

444

EIS-0397: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...

445

EA-1912: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Mitigation Action Plan EA-1912: Mitigation Action Plan Midway-Benton No. 1 Rebuild Project, neartown of Desert Aire, Benton County, Washington This Mitigation Action Plan (MAP)...

446

Corrective Action Tracking System (CATS) | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Action Tracking System (CATS) Corrective Action Tracking System (CATS) The CATS web-based database is used to enter, track, and report the status of corrective actions...

447

EA-1891: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan EA-1891: Mitigation Action Plan Alvey-Fairview Transmission Line Rebuild Project, Oregon This Mitigation Action Plan (MAP) is part of the Finding of No...

448

Part 3: Removal Action | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Removal Action 3: Removal Action Part 3: Removal Action Question: When may removal actions be initiated? Answer: Removal actions may be initiated when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to health or the environment. The NCP specifies that the determination that a risk to health or the environment is appropriate for removal action should be based on: actual or potential exposure of humans, animals, or the food chain the presence of contained hazardous substances that pose a threat of release the threat of migration of the hazardous substances the threat of fire or explosion the availability of an appropriate Federal or State response capability [section 300.415(b)(2)]. In essence, where DOE identifies a threat of exposure to or migration of

449

Solar energy in Egypt: Significant business opportunities  

Science Journals Connector (OSTI)

Until now, there are some specific constraints that hinder development of solar energy in Egypt. However, Egypt has an adequate sunshine, an extended territory free of inhabitants and the political will of its government to reach a share of 20% from RES in the national energy balance by 2020. As a result, the business opportunities for solar energy development in Egypt are really significant. The scope of the paper is to provide insight to the possible investment opportunities of solar energy in Egyptian market, based on a current and wide analysis. Indeed, Egypt is an interesting example to show the practical possibilities of the development of Solar Energy in Southern Mediterranean countries. Based on the excellent collaboration between the European Commission and the Egyptian authorities, the current sector is of high interest for developing European entrepreneurship in Egypt. An appropriate approach was developed for the overview as well as analysis of the business opportunities in Egyptian solar energy market, under the umbrella of a Hellenic Aid programme (20092010).

Konstantinos D. Patlitzianas

2011-01-01T23:59:59.000Z

450

Microsoft Word - Mitigation Action Plan master.doc  

Broader source: Energy.gov (indexed) [DOE]

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project DOE/EA-1591 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. This MAP is for the Proposed Action and includes all integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. No impacts reached the level to be considered significant even without these mitigation measures.

451

Notices LIST OF AFFECTED PROGRAMS  

Broader source: Energy.gov (indexed) [DOE]

90 Federal Register 90 Federal Register / Vol. 76, No. 175 / Friday, September 9, 2011 / Notices LIST OF AFFECTED PROGRAMS CFDA No. and name Publication date and FEDERAL REG- ISTER citation Original deadline for transmittal of applications Revised deadline for transmittal of applications Original deadline for inter-govern- mental review Extended dead- line for inter-gov- ernmental review 84.215N: Promise Neighborhoods Program- Implementation. 7/6/2011 76 FR 39615. 9/06/2011 9/13/2011 11/03/2011 11/10/2011 84.215P: Promise Neighborhoods Program- Planning. 7/06/2011 76 FR 39630. 9/06/2011 9/13/2011 11/03/2011 11/10/2011 Electronic Access to This Document The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal

452

Notices Affected Public: Individuals and  

Broader source: Energy.gov (indexed) [DOE]

23 Federal Register 23 Federal Register / Vol. 76, No. 23 / Thursday, February 3, 2011 / Notices Affected Public: Individuals and households; not-for-profit institutions; State, Local, or Tribal Government, State Educational Agencies or Local Educational Agencies. Total Estimated Number of Annual Responses: 22,760. Total Estimated Number of Annual Burden Hours: 8,725. Abstract: The study is being conducted as part of the National Assessment of Title I, mandated by Title I, Part E, Section 1501 of the Elementary and Secondary Education Act. The study is designed to identify school programs and instructional practices associated with improved language development, background knowledge, and comprehension outcomes for children in prekindergarten through third grade. Analyses will estimate the

453

Factors Affecting Choice and Judgment  

Science Journals Connector (OSTI)

... natural conditions, records being made of the behaviour of road users, both drivers and pedestrians, to determine how this behaviour could be improved. The findings must be of interest ... the existence of fast traffic on the major road. The same effects are observable on pedestrians; a policeman at a crossing has a significant effect on those (chiefly men, ...

R. G. HOPKINSON

1952-10-04T23:59:59.000Z

454

THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES  

SciTech Connect (OSTI)

The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

Harris, S.; Gross, R.

2014-04-01T23:59:59.000Z

455

Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.

DOE /NV

1998-12-08T23:59:59.000Z

456

Sulfolipid Deficiency Does Not Affect the Virulence of Mycobacterium tuberculosis H37Rv in Mice and Guinea Pigs  

Science Journals Connector (OSTI)

...p. 363-461. In M. Kates (ed.), Handbook of lipid research: glycolipids, phosphoglycolipids...56: 2876-2883. Sulfolipid deficiency does not affect the virulence of Mycobacterium...all expectations, sulfolipid deficiency does not significantly affect the replication...

Ccile Rousseau; Oliver C. Turner; Erik Rush; Yann Bordat; Tatiana D. Sirakova; Pappachan E. Kolattukudy; Shannon Ritter; Ian M. Orme; Brigitte Gicquel; Mary Jackson

2003-08-01T23:59:59.000Z

457

DOE Standards Actions, November 1999  

Broader source: Energy.gov (indexed) [DOE]

DOE Projects Canceled DOE Projects Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Worker Protection for Uranium Facilities, Project Number SAFT-0058; Peter O’Connell, EH-52; 301-903-5641, Peter .O’Connell@eh.doe.gov. This project was superceded by Guide of Good Practices for Oc- cupational Radiological Protec- tion in Uranium Facilities, Project Number SAFT-0072. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with copies for comment. The full text of these documents are available on the Technical Standards Pro- gram (TSP) Web Site at the URL shown at the bottom of this page.

458

EM International Program Action Table  

Broader source: Energy.gov (indexed) [DOE]

EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 E M I n t e r n a t i o n a l P r o g r a m s Page 1 ACTION TABLE Subject Lead Office Engaging Country Meeting Location Purpose Status Date of Event 3 rd US/German Workshop on Salt Repository Research, Design and Operations N. Buschman, EM-22 Germany Albuquerque & Carlsbad, NM Continue collaboration with Germans on salt repository research, design and operations. Draft agenda prepared. October 8-12, 2012 International Framework for Nuclear Energy Cooperation (IFNEC) Ministerial R. Elmetti, EM- 2.1 Multilateral Marrakech, Morocco To support the development of nuclear energy infrastructure globally through workforce training, information sharing, and approaches related to the safe, secure and responsible use of

459

The Standards Actions, August 1998  

Broader source: Energy.gov (indexed) [DOE]

standard project was recently can- standard project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Guidelines for Preparing Criti- cality Safety Evaluations at De- partment of Energy Non-Reac- tor Nuclear Facilities, Project Number SAFT-0069; Jerry McKamy, EH-34, 301-903-8031, Jerry. McKamy@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Tritium Handling and Safe Storage, Project Number SAFT-0054;

460

The Standards Action - April 1999  

Broader source: Energy.gov (indexed) [DOE]

Projects Canceled Projects Canceled The following DOE technical standard project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Seismic Design and Evaluation Guidelines for High-Level Waste Storage Tanks, 6910-0035; Owen Thompson, EM-38, 301- 903-1926, FAX 301-903-7604, Owen.Thompson@em.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Internet Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Stabilization, Packaging, and Storage of Plutonium-Bearing

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The Standards Actions February 1996  

Broader source: Energy.gov (indexed) [DOE]

Actions Technical Standards Program Document Status as of 1/31/96 In Preparation 5 7 Out for Comment 2 1 Total in process = 78 Published in Past 30 Days 0 In Conversion 2 3 Projects Initiated The following DOE technical standards projects were recently initiated. If you are interested in participating in the development of these standards, please contact the persons listed below. * Handbook for the Department of Energy Laboratory Accreditation Program for Radiobioassay, Project No. SAFT-0049; Robert Loesch, EH-52; 301-903- 4443, Email, loesch@viper.eh.doe.gov. * Guide to Good Practices for Training and Qualification of Instructors, Project No. 6910-0051; Ken L Maier, EH-31; 208-526- 9178, FAX 208-526-9650, Email, klm4@inel.gov. * Guide to Good Practices for Training and Qualification of

462

Memorandum: Emergency Actions and NEPA  

Broader source: Energy.gov (indexed) [DOE]

8, 2005 8, 2005 MEMORANDUM FOR FEDERAL NEPA CONTACTS FROM: HORST G. GRECZMIEL Associate Director for NEPA Oversight SUBJECT: Emergency Actions and NEPA This memorandum provides: * General information on the response to Katrina * Reporting oil and chemical spills * Projected long term recovery efforts * How agencies can respond to emergencies and comply with NEPA. Please distribute this memorandum to your agency planning and environmental personnel. General information on the response to Katrina: Information is available on the FEMA website at http://www.fema.gov and specifics on the government's response are provided at the "What Government is Doing" link which can be directly accessed at http://www.dhs.gov/dhspublic/interapp/editorial/editorial_0712.xml

463

The Standards Actions, February 1998  

Broader source: Energy.gov (indexed) [DOE]

standards project was recently can- standards project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Software Quality Assurance Requirements, Procedures, and Guidelines, Project QCIC-0008; Burton Rothleder, EH-31, 301- 903-3726, FAX 301-903-9523, Burton.Rothleder@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of these documents is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on these documents, please notify your TSM. • DOE Handbook Design Considerations, Project Number EDCN-0001; Richard Stark, EH-31; 301-903-4407, FAX 301-

464

Lawrence Berkeley Laboratory Affirmative Action Program. Revised  

SciTech Connect (OSTI)

The Lawrence Berkeley Laboratory`s Affirmative Action Program (AAP) serves as a working document that describes current policies, practices, and results in the area of affirmative action. It represents the Laboratory`s framework for an affirmative approach to increasing the representation of people of color and women in segments of our work force where they have been underrepresented and taking action to increase the employment of persons with disabilities and special disabled and Vietnam era veterans. The AAP describes the hierarchy of responsibility for Laboratory affirmative action, the mechanisms that exist for full Laboratory participation in the AAP, the policies and procedures governing recruitment at all levels, the Laboratory`s plan for monitoring, reporting, and evaluating affirmative action progress, and a description of special affirmative action programs and plans the Laboratory has used and will use in its efforts to increase the representation and retention of groups historically underrepresented in our work force.

NONE

1995-06-01T23:59:59.000Z

465

A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes  

SciTech Connect (OSTI)

This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

Not Available

1994-02-01T23:59:59.000Z

466

Affective objectives in a programming languages course  

Science Journals Connector (OSTI)

This paper discusses the use of affective objectives in upper-level computer science courses. The use of affective objectives can enrich student experiences, support student motivation, and enhance the achievement of the cognitive objectives. The paper ... Keywords: BNF, affective objectives, internalization, memory models, parameter passing, programming languages, syntax diagrams, value

David Langan; Leo F. Denton; Dawn McKinney

2005-03-01T23:59:59.000Z

467

Action Codes Table | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Action Codes Table | National Nuclear Security Administration Action Codes Table | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Action Codes Table Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Code Tables > Action Codes Table

468

Proposed Changes to Emergency Action Levels  

E-Print Network [OSTI]

Reference (a) provided proposed changes to Vermont Yankee's (VY's) Emergency Action Levels (EALs). This letter provides additional information requested by USNRC staff during a telecon held on

Vermont Yankee; Gautam Sen; Richard J. Conte; Emergency Preparedness; Safeguards Branch; Division Of Reactor

469

Chapter 4 Proposed Action and Alternatives  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

need for the project and achieve the project's purposes (see Section 1.3, Purposes). BPA developed four action alternatives from combinations of the route segments and...

470

California Climate Action Registry | Open Energy Information  

Open Energy Info (EERE)

Place: Los Angeles, California Zip: 90014 Product: Los Angeles-based NPO which develops GHG reporting standards and tools for organisations. References: California Climate Action...

471

Energy Action Month | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and water that can help you meet critical agency mission goals, see Federal Energy and Water Management Awards to read about model Federal projects. During Energy Action Month...

472

United States and Japan Sign Joint Nuclear Energy Action Plan to Promote  

Broader source: Energy.gov (indexed) [DOE]

Japan Sign Joint Nuclear Energy Action Plan to Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation April 25, 2007 - 12:36pm Addthis WASHINGTON, DC - United States Department of Energy Secretary Samuel W. Bodman and Japan's Ministers Akira Amari, Bunmei Ibuki, and Taro Aso, this week presented to U.S. President George W. Bush and Japanese Prime Minister Shinzo Abe, the United States-Japan Joint Nuclear Energy Action Plan. The Action Plan - a product of extensive negotiations between the U.S. and Japan - provides a framework for increased collaboration in nuclear energy. It builds upon the significant, longstanding civilian nuclear cooperation between the two nations and will contribute to increasing

473

Recessive and Dominant Gene Action  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Recessive and Dominant Gene Action Recessive and Dominant Gene Action Name: Katie Location: N/A Country: N/A Date: N/A Question: What Causes some genes to be ressesive and other genes to be dominant? Replies: Think about the fact that genes code for directions for making proteins. There are many different kinds of proteins in our body-enzymes for regulating metabolism, structural proteins for building our bodies, hormones for regulating processes etc. If the gene for the protein is structural, then it is important to have the right kind and the right amount. If the gene is defective (usually recessive genes are defective, but not always) the right protein will not be made and the structure will either be defective and won't work at all or there won't be enough to maintain the structure. Sometimes you need both genes to be working to get enough of the structure. So a homozygous person will have the strongest structure. A heterozygote would have one gene that is working a may produce enough of the protein to maintain the structure, but maybe not. So in some cases, just having one copy of the dominant (working) gene is enough. If it is a trait for something like eye color, this is not going to cause a defect, just a difference. In this case, being heterozygous or homozgyous for the dominant trait produces the same color of eye. In the case of sickle cell anemia, the recessive gene changes the protein structure of the shape of the red blood cell. If you have one good copy and one bad copy of the gene, some of your cells will be normal and some will be sickle cells. One good copy of the gene gives you enough normal red blood cells to stay healthy. But if you don't have a normal copy, all of your cells have the capability to sickle under certain conditions and this can be fatal. So think of dominant and recessive genes in terms of what they produce and what that protein is supposed to do and then think of what would happen if the dominant gene was able to overtake the effect of the recessive gene.

474

Robotic actions in the human brain Robotic movement preferentially engages the action observation network  

E-Print Network [OSTI]

Robotic actions in the human brain 1 Robotic movement., Stadler, W. & Prinz, W. (in press / 2011). Robotic movement preferentially engages the action observation network. Human Brain Mapping. #12;Robotic

Hamilton, Antonia

475

March 2007 Standards Forum and Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

March 2007 March 2007 Continued on next page TSP Manager's Notes 1 Domestic Programs (American National Standards) Overview 2 Aerospace Industry Advocates Standards Selection Based on Technical Merit, Not Semantics 3 Report Recommends Withdrawal of OMB Risk Assessment Bulletin 4 Technical Standards Manager Spotlight 5 Topical Committee Developments 6 Welcome Aboard the TSMC! 7 Standards Actions 8 DOE Standards Actions 8

476

December 2006 Standards Forum and Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

December 2006 December 2006 TSP Manager's Notes 1 Meeting In The Middle 2 Plain Talk for a New Generation 3 Licensing New Nuclear Power Plants 4 ANSI Government Affairs Overview 5 Technical Standards Manager Spotlight 7 Topical Committee Developments 8 Welcome Aboard the TSMC! 8 Standards Actions 9 DOE Standards Actions 9

477

Group actions on twin buildings Peter Abramenko  

E-Print Network [OSTI]

Group actions on twin buildings Peter Abramenko Introduction Though parts of the present paper sense) for the action of G(k[t, t-1 ]) on the product + � - of the two associated Bruhat�Tits buildings 4 also yielded a preliminary version of Lemma 2 involving both affine buildings + and -. Thus I

Chapman, Robin

478

Open government partnership: Argentina action plan  

Science Journals Connector (OSTI)

In 2009, Iberoamerican countries signed the Charter of Citizen Participation in Public Administration. Well in advance in 2003, the Argentinean Government issued a decree ensuring freedom of information. Based on such decree and fulfilling the commitments ... Keywords: argentina action plan, government action plan, open government, public policies

Pedro Janices; Natalia Aguerre

2013-10-01T23:59:59.000Z

479

Microsoft Word - Final Mitigated Action Plan - CNMI.docx  

Broader source: Energy.gov (indexed) [DOE]

| P | P a g e MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT FOR THE GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Golden Service Center Office of Energy Efficiency and Renewable Energy DOE/EA-1923 2 | P a g e ACRONYMS AND ABBREVIATIONS AMC Adaptive Management Committee CFR Code of Federal Regulations DOE U.S. Department of Energy EA environmental assessment ESA Endangered Species Act FONSI finding of no significant impacts MAP mitigation action plan NEPA National Environmental Policy Act USFWS U.S. Fish and Wildlife Service 3 | P a g e 1.0 Introduction The United States Department of Energy (DOE) has issued a Final Environmental Assessment (EA) and a

480

Actions to promote energy-efficient electric motor repair  

Science Journals Connector (OSTI)

Electric motors are repaired 2-3 times over their lifetime. Poor repair practices, particularly widespread in developing countries, can lead to a significant increase in motor losses. It is estimated that worldwide poor repair leads to annual electricity losses of approximately 40 TWh, representing 20 Mtons of CO2 emissions. The main objective of this paper is to provide a technical basis for designing demand side management actions, which address the motor repair market. This paper brings into focus motor repair process trends, energy-efficient motors, typical repair process, actions to promote energy-efficient motor repair, energy-efficient motor rebate schemes to replace old, badly damaged motors and the factors influencing payback. This paper will be useful to energy policy makers, and Demand Side Management (DSM) staff in energy agencies and electric utilities.

Aníbal T. de Almeida; Fernando J.T.E. Ferreira

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "action significantly affecting" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

Tracker Tracker Jump to: navigation, search Tool Summary Name: Climate Action Tracker Agency/Company /Organization: Ecofys Sector: Climate Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual Website: www.climateactiontracker.org/ Climate Action Tracker Screenshot References: Climate Action Tracker[1] "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The website provides an up-to-date assessment of individual national pledges to reduce their greenhouse gas emissions. In the framework of the UNFCCC, many countries have put proposals on the table about how much they intend to reduce their greenhouse-gas emissions in both the near and the long term.

482

Climate Protection Action Fund | Open Energy Information  

Open Energy Info (EERE)

Action Fund Action Fund (Redirected from The Climate Protection Action Fund) Jump to: navigation, search Logo: The Climate Protection Action Fund Name The Climate Protection Action Fund Address 901 E Street, NW Suite 610 Place Washington, District of Columbia Zip 20004 Website http://www.climateprotectionac Coordinates 38.896398°, -77.024192° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.896398,"lon":-77.024192,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

483

Energy Action Month | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Outreach » Energy Action Month Services » Outreach » Energy Action Month Energy Action Month October 7, 2013 - 4:43pm Addthis The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote energy- and water-saving practices in Federal facilities. This year's outreach materials call on Federal employees to take action and empower leadership, innovation, and excellence to realize a secure energy future. Empower Leadership One individual can empower collaboration and teamwork that can spark change and result in sustainable solutions. Empower coworkers, groups, and entire organizations to lead by example, build momentum, and make a difference. Empower Innovation Innovative thinking can guide strategic sustainability plans, generate new best practices, and accelerate the deployment of clean energy technologies.

484

Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories -  

Broader source: Energy.gov (indexed) [DOE]

nergy nergy Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories - Improved Power System Operations Using Advanced Stochastic Optimization Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): New Mexico, Iowa, Massachusetts, Washington, and California Proposed Action Description: Funding will support development of an integrated probabilistic decision-making software that can account for uncertain conditions that affect renewable energy sources to ensure reliable and efficient use of power system assets and enforce AC power flow constraints. Proposed work consists of (1) developing a two-stage optimized algorithm for the stochastic unit commitment and economic dispatch and pricing

485

Cognition and affect in the development of sense of place  

E-Print Network [OSTI]

, 1974a), both selfconscious and unselfconscious (Relph, 1976), and both cognitive and affective (Firey, 1945; Piaget and Weil, 1951). These definitions and charac- terizations are the beginning attempts at describing the processes by which sense... experience are greatly weakened in most contemporary cultures. The trend is toward an environment of few significant places--towards a placeless geography (Relph, 1976, 93, 117). As a result of this concern there is a trend to restore and encourage sense...

Engman, Dianne Lynn

2012-06-07T23:59:59.000Z

486

Factors affecting color stability of vinegar pickled meat products  

E-Print Network [OSTI]

150 ppm nitrite and 600 ppm erythorbate. Visual color scores decreased (P& . 05) with increasing storage intervals. pH values were signifi- cantly (P &. 05) affected by color additive, vinegar strength, nitrite level, erythorbate level and storage... interval. Higher nitrite levels (150 ppm) and higher erythorbate levels (600 ppm) resulted in higher (P&. 05) pH values than did lower levels of these ingredients. With increased storage time, pH values increased and were significantly (p &. 05...

Ploch, Carol Ann

1978-01-01T23:59:59.000Z

487

Corrective Action Decision Document for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document has been prepared for the Nevada Test Site's Area 23 Mercury Fire Training Pit (Corrective Action Unit 342) in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996). Corrective Action Unit 342 is comprised of Corrective Action Site 23-56-01. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for Corrective Action Unit 342. The scope of this document consists of the following: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for the Corrective Action Unit.

DOE /NV

1999-05-26T23:59:59.000Z

488

Migratory birds affect stability of intertidal sediments.  

Science Journals Connector (OSTI)

An ecological cascade effect: Migratory birds affect stability of ... tion) effect changes in coastal and estuarine .... ship would be expected if the cohesion was.

1999-12-22T23:59:59.000Z

489

EA-1440-S1: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

440-S1: Finding of No Significant Impact 440-S1: Finding of No Significant Impact EA-1440-S1: Finding of No Significant Impact National Renewable Energy Laboratory's South Table Mountain Complex (Golden, Colorado) (see also DOE/EA-1440-S1 / DOE/EA-1609; DOE/EA-1440-S2 / DOE/EA-1738) In accordance with the Department of Energy National Environmental Policy Act (NEPA) implementing regulations, DOE evaluated the potential environmental impacts that would result from three actions at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site: 1) Proposed Construction and Operation of Research Support Facilities (RSF), 2) Infrastructure Improvements (Phase I), and 3)Upgrades to the Thermochemical User Facility (TCUF) and addition of the Thermochemical Biorefinery Pilot Plant (TBPP).

490

U.S. Department of Energy Finding of No Significant Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Finding of No Significant Impact Finding of No Significant Impact Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant in Eddy County, New Mexico AGENCY: U.S. Department of Energy ACTION: Finding of No Significant Impact (FONSI) SUMMARY: The U.S. Department of Energy (DOE), Carlsbad Field Office, has adopted an Environmental Assessment (EA) prepared by the U.S. Department of the Interior Bureau of Land Management (BLM) Carlsbad Field Office for the reconstruction of the South Access Road for the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. DOE currently operates WIPP as a disposal site for transuranic (TRU) waste and TRU-mixed waste containing hazardous chemical constituents generated by the nuclear defense activities of the federal government.

491

DOE Steps Lead to Significant Increase in Compliance with Energy Efficiency  

Broader source: Energy.gov (indexed) [DOE]

Steps Lead to Significant Increase in Compliance with Energy Steps Lead to Significant Increase in Compliance with Energy Efficiency Reporting Requirements DOE Steps Lead to Significant Increase in Compliance with Energy Efficiency Reporting Requirements January 12, 2010 - 12:00am Addthis WASHINGTON DC - The Department of Energy announced today that it has received certifications for over 600,000 residential appliances in 15 different product categories in response to the Department's enhanced energy efficiency enforcement efforts. DOE recently announced that manufacturers had until January 8, 2010 to submit correct energy use data to the Department of Energy before aggressive enforcement actions were taken. The certification data provided by 160 different manufacturers will allow DOE to review manufacturers' compliance with minimum energy

492

Recommendations for Remedial Action at Everest, Kansas.  

SciTech Connect (OSTI)

On September 7, 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented a Scoping Memo (Argonne 2005) for preliminary consideration by the Kansas Department of Health and Environment (KDHE). This document suggested possible remedial options for the carbon tetrachloride contamination in groundwater at Everest, Kansas. The suggested approaches were discussed by representatives of the KDHE, the CCC/USDA, and Argonne at the KDHE office in Topeka on September 8-9, 2005, along with other technical and logistic issues related to the Everest site. In response to these discussions, the KDHE recommended (KDHE 2005) evaluation of several remedial processes, either alone or in combination, as part of a Corrective Action Study (CAS) for Everest. The primary remedial processes suggested by the KDHE included the following: (1) Hydraulic control by groundwater extraction with aboveground treatment; (2) Air sparging-soil vapor extraction (SVE) in large-diameter boreholes; and (3) Phytoremediation. As a further outcome of the 2005 meeting and as a precursor to the proposed CAS, the CCC/USDA completed the following supplemental investigations at Everest to address several specific technical concerns discussed with the KDHE: (1) Construction of interpretive cross sections at strategic locations selected by the KDHE along the main plume migration pathway, to depict the hydrogeologic characteristics affecting groundwater flow and contaminant movement (Argonne 2006a); (2) A field investigation in early 2006 (Argonne 2006c), as follows: (a) Installation and testing of a production well and associated observation points, at locations approved by the KDHE, to determine the response of the Everest aquifer to groundwater extraction near the Nigh property; (b) Groundwater sampling for the analysis of volatile organic compounds (VOCs) and the installation of additional permanent monitoring points at locations selected by the KDHE, to further constrain the existing co