National Library of Energy BETA

Sample records for action replace spacer

  1. Spacer Damper Replacement Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect Photovoltaics -7541C. TemperatureThousand

  2. Generator stator core vent duct spacer posts

    DOE Patents [OSTI]

    Griffith, John Wesley (Schenectady, NY); Tong, Wei (Clifton Park, NY)

    2003-06-24

    Generator stator cores are constructed by stacking many layers of magnetic laminations. Ventilation ducts may be inserted between these layers by inserting spacers into the core stack. The ventilation ducts allow for the passage of cooling gas through the core during operation. The spacers or spacer posts are positioned between groups of the magnetic laminations to define the ventilation ducts. The spacer posts are secured with longitudinal axes thereof substantially parallel to the core axis. With this structure, core tightness can be assured while maximizing ventilation duct cross section for gas flow and minimizing magnetic loss in the spacers.

  3. Separator-spacer for electrochemical systems

    DOE Patents [OSTI]

    Grimes, Patrick G. (Westfield, NJ); Einstein, Harry (Springfield, NJ); Newby, Kenneth R. (Berkeley Heights, NJ); Bellows, Richard J. (Westfield, NJ)

    1983-08-02

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  4. Tube support grid and spacer therefor

    DOE Patents [OSTI]

    Ringsmuth, Richard J. (Solano Beach, CA); Kaufman, Jay S. (Del Mar, CA)

    1986-01-01

    A tube support grid and spacers therefor provide radially inward preloading of heat exchange tubes to minimize stress upon base welds due to differential thermal expansion. The grid comprises a concentric series of rings and spacers with opposing concave sides for conforming to the tubes and V-shaped ends to provide resilient flexibility. The flexibility aids in assembly and in transmitting seismic vibrations from the tubes to a shroud. The tube support grid may be assembled in place to achieve the desired inwardly radial preloading of the heat exchange tubes. Tab and slot assembly further minimizes stresses in the system. The radii of the grid rings may be preselected to effect the desired radially inward preloading.

  5. Physics Contribution Nanoparticle-Based Brachytherapy Spacers for

    E-Print Network [OSTI]

    Sridhar, Srinivas

    Physics Contribution Nanoparticle-Based Brachytherapy Spacers for Delivery of Localized Combined of brachytherapy spacers for in situ release of drug eluting nanoparticles to provide tissue residence therapy to enhance the therapeutic ratio Purpose: In radiation therapy (RT), brachytherapy-inert source

  6. Nuclear reactor spacer grid and ductless core component

    DOE Patents [OSTI]

    Christiansen, David W. (Kennewick, WA); Karnesky, Richard A. (Richland, WA)

    1989-01-01

    The invention relates to a nuclear reactor spacer grid member for use in a liquid cooled nuclear reactor and to a ductless core component employing a plurality of these spacer grid members. The spacer grid member is of the egg-shell type and is constructed so that the walls of the cell members of the grid member are formed of a single thickness of metal to avoid tolerance problems. Within each cell member is a hydraulic spring which laterally constrains the nuclear material bearing rod which passes through each cell member against a hardstop in response to coolant flow through the cell member. This hydraulic spring is also suitable for use in a water cooled nuclear reactor. A core component constructed of, among other components, a plurality of these spacer grid members, avoids the use of a full length duct by providing spacer sleeves about the sodium tubes passing through the spacer grid members at locations between the grid members, thereby maintaining a predetermined space between adjacent grid members.

  7. Development of a new feed channel spacer for reverse osmosis elements. Phase 2 final report, October 1, 1994--December 31, 1997

    SciTech Connect (OSTI)

    Milstead, C.E.; Riley, R.L.

    1998-02-11

    During Phase 1, computer modeling techniques were used as the prime instrument of evaluation of designs for a new feed channel spacer to replace the 30 mil thick standard mesh (Vexar) spacer currently used in ROWPU [Reverse Osmosis Water Processing Unit] spiral-wound elements. A hemispherical peg model, based on a Bed of Nails concept developed in Phase 1, was selected for prototype production of spiral-wound elements for field testing. Evaluation in the See-Thru test cell to observe pressure drops through the spacer, feed mixing patterns and ease of cleaning fouled membrane samples showed considerable benefit over Vexar. This design would be suitable for production by roll embossing (or rotary punching) methods instead of expensive injection molding techniques. A 10{1/2} inch die set was fabricated to prove this concept using a 12 ton press brake. Due to a number of factors, however, the equipment did not work as anticipated and numerous modifications are currently in progress. This work will continue at no cost to the government until completed. A seawater test system has been constructed for field testing of various commercially available feed channel spacers for comparison with the Vexar spacer.

  8. Surgical navigation in canine total knee replacement

    E-Print Network [OSTI]

    Peters, Kaleigh M.; Hutter, Erin; Siston, Robert A.; Bertran, Judith

    2015-06-16

    of the cutting block provides a surrogate marker for final alignment of the 179 tibial component. A flat, thin-bladed tracking tool (Figure 2E) was placed on the top 180 surface of the tibial cutting block to record its orientation in the frontal and sagittal... ] Baker KM, Foutz TL, Johnson KJ, et al. Effects of tibial plateau angle and spacer 444 thickness applied during in vitro canine total knee replacement on three-dimensional 445 kinematics and collateral ligament strain. Am J Vet Res 2014; 75...

  9. Filter holder assembly having extended collar spacer ring

    DOE Patents [OSTI]

    Alvin, Mary Anne (Pittsburgh, PA); Bruck, Gerald J. (Murrysville, PA)

    2002-01-01

    A filter holder assembly is provided that utilizes a fail-safe regenerator unit with an annular spacer ring having an extended metal collar for containment and positioning of a compliant ceramic gasket used in the assembly. The filter holder assembly is disclosed for use with advanced composite, filament wound, and metal candle filters.

  10. Improving electricity production in tubular microbial fuel cells through optimizing the anolyte flow with spiral spacers

    E-Print Network [OSTI]

    Improving electricity production in tubular microbial fuel cells through optimizing the anolyte h l i g h t s " The spiral spacers improve electricity production in tubular microbial fuel cells fuel cells Spiral spacers Energy Wastewater treatment a b s t r a c t The use of spiral spacers

  11. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Broader source: Energy.gov (indexed) [DOE]

    Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

  12. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01

    Samuel Schenker, “The Costs of Hir- u ing Skilled Workers”,Employee Replacement Costs Arindrajit Dube, Eric Freeman andof employee replacement costs, using a panel survey of

  13. Energy Replacement Generation Tax Exemption

    Broader source: Energy.gov [DOE]

    Under the Energy Replacement Generation Tax Exemption, the following facilities are exempt from the replacement tax:

  14. Three-dimensional microstructuring of carbon by thermoplastic spacer evaporation during pyrolysis

    E-Print Network [OSTI]

    Chung, Deborah D.L.

    Three-dimensional microstructuring of carbon by thermoplastic spacer evaporation during pyrolysis pyrolysis of an epoxy-based film that coated the spacer and parts of the sub- strate. Fillers were chosen to reduce the shrinkage during pyrolysis and to increase the electrical conductivity. Multiwalled carbon

  15. Radiation Source Replacement Workshop

    SciTech Connect (OSTI)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  16. Apparatus and methods for aligning holes through wheels and spacers and stacking the wheels and spacers to form a turbine rotor

    DOE Patents [OSTI]

    Berry, Robert Randolph (Greenville, SC); Palmer, Gene David (Clifton Park, NY); Wilson, Ian David (Clifton Park, NY)

    2000-01-01

    A gas turbine rotor stacking fixture includes upstanding bolts for reception in aligned bolt holes in superposed aft disk, wheels and spacers and upstanding alignment rods received in openings of the disk, wheels and spacers during the rotor stacking assembly. The axially registering openings enable insertion of thin-walled tubes circumferentially about the rim of the rotor, with tight tolerances to the openings to provide supply and return steam for cooling buckets. The alignment rods have radial dimensions substantially less than their dimensions in a circumferential direction to allow for radial opening misalignment due to thermal expansion, tolerance stack-up and wheel-to-spacer mismatch due to rabbet mechanical growth. The circumferential dimension of the alignment rods affords tightly toleranced alignment of the openings through which the cooling tubes are installed.

  17. Methods for disassembling, replacing and assembling parts of a steam cooling system for a gas turbine

    DOE Patents [OSTI]

    Wilson, Ian D. (Mauldin, SC); Wesorick, Ronald R. (Albany, NY)

    2002-01-01

    The steam cooling circuit for a gas turbine includes a bore tube assembly supplying steam to circumferentially spaced radial tubes coupled to supply elbows for transitioning the radial steam flow in an axial direction along steam supply tubes adjacent the rim of the rotor. The supply tubes supply steam to circumferentially spaced manifold segments located on the aft side of the 1-2 spacer for supplying steam to the buckets of the first and second stages. Spent return steam from these buckets flows to a plurality of circumferentially spaced return manifold segments disposed on the forward face of the 1-2 spacer. Crossover tubes couple the steam supply from the steam supply manifold segments through the 1-2 spacer to the buckets of the first stage. Crossover tubes through the 1-2 spacer also return steam from the buckets of the second stage to the return manifold segments. Axially extending return tubes convey spent cooling steam from the return manifold segments to radial tubes via return elbows. The bore tube assembly, radial tubes, elbows, manifold segments and crossover tubes are removable from the turbine rotor and replaceable.

  18. Design and Fabrication of End Spacers for a 13T Nb3Sn Dipole Magnet

    E-Print Network [OSTI]

    Caspi, S.

    2011-01-01

    origin a ll y ma chined from wax billets which were later ~sa large nwnber of different wax spacers co uld be manu factumade from Lucile or machinable wax wiU) an oute r dinme ter

  19. Replacing Lightbulbs and Ballasts | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lighting Replacing Lightbulbs and Ballasts Replacing Lightbulbs and Ballasts Replace frequently used bulbs with more energy efficient options to save money and energy. Replace...

  20. Rotor bore and turbine rotor wheel/spacer heat exchange flow circuit

    DOE Patents [OSTI]

    Caruso, Philip M. (Selkirk, NY); Eldrid, Sacheverel Quentin (Saratoga Springs, NY); Ladhani, Azad A. (Niskayuna, NY); DeMania, Alan Richard (Niskayuna, NY); Palmer, Gene David (Clifton Park, NY); Wilson, Ian David (Clifton Park, NY); Rathbun, Lisa Shirley (Scotia, NY); Akin, Robert Craig (Schenectady, NY)

    2002-01-01

    In a turbine having closed-circuit steam-cooling passages about the rim of the rotor during steady-state operation, compressor discharge air is supplied to the rotor bore for passage radially outwardly into the wheel space cavities between the wheels and spacers. Communicating slots and channels in the spacers and wheels at circumferentially spaced positions enable egress of the compressor discharge air into the hot gas flow path. At turbine startup, cooling air flows through the closed-circuit steam passages to cool the outer rim of the rotor while compressor discharge air pre-warms the wheels and spacers. At steady-state, cooling steam is supplied in the closed-circuit steam-cooling passages and compressor discharge air is supplied through the bore and into the wheel space cavities to cool the rotor.

  1. Wafer-Level Packaging Technology for RF Applications Based on a Rigid Low-Loss Spacer

    E-Print Network [OSTI]

    Technische Universiteit Delft

    Wafer-Level Packaging Technology for RF Applications Based on a Rigid Low-Loss Spacer Substrate Alexander Polyakov #12;#12;Wafer-Level Packaging Technology for RF Applications Based on a Rigid Low ICs...............................................13 1.4. Wafer-level packaging for RF applications

  2. Corrective Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment Environmental Protection Obeying Environmental Laws Individual Permit Corrective Action Individual Permit: Corrective Action Certifications If...

  3. Helicopter aids transmission pole replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Helicopter-aids-transmission-pole-replacement Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects...

  4. Window Replacement, Rehabilitation, & Repair Guides - Building...

    Energy Savers [EERE]

    Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

  5. Virent is Replacing Crude Oil

    Office of Energy Efficiency and Renewable Energy (EERE)

    Breakout Session 2A—Conversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent

  6. Replacing Fluorescent Lightbulbs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fluorescent Lightbulbs Replacing Fluorescent Lightbulbs July 29, 2012 - 6:37pm Addthis Although fluorescent lightbulbs are generally energy efficient, you can replace them with...

  7. Will peanut hulls replace oil

    SciTech Connect (OSTI)

    Not Available

    1980-12-01

    A low-cost, fast-curing wood adhesive has been recently developed by the University of Georgia, in which up to 80% of the petroleum ingredients can be replaced with a substance extracted from peanut hulls. An outline of the process is given.

  8. Si/SiGe electron resonant tunneling diodes with graded spacer wells

    SciTech Connect (OSTI)

    Paul, D. J.; See, P.; Bates, R.; Griffin, N.; Coonan, B. P.; Redmond, G.; Crean, G. M.; Zozoulenko, I. V.; Berggren, K.-F.; Hollander, B.

    2001-06-25

    Resonant tunneling diodes have been fabricated using graded Si{sub 1{minus}x}Ge{sub x} (x=0.3{r_arrow}0.0) spacer wells and strained Si{sub 0.4}Ge{sub 0.6} barriers on a relaxed Si{sub 0.7}Ge{sub 0.3} n-type substrate which demonstrates negative differential resistance at up to 100 K. This design is aimed at reducing the voltage at which the peak current density is achieved. Peak current densities of 0.08A/cm{sup 2} with peak-to-valley current ratios of 1.67 have been achieved for a low peak voltage of 40 mV at 77 K. This represents an improvement of over an order of magnitude compared to previous work. {copyright} 2001 American Institute of Physics.

  9. The effect of anterior proton beams in the setting of a prostate-rectum spacer

    SciTech Connect (OSTI)

    Christodouleas, John P.; Tang, Shikui; Susil, Robert C.; McNutt, Todd R.; Song, Danny Y.; Bekelman, Justin; Deville, Curtiland; Vapiwala, Neha; DeWeese, Theodore L.; Lu, Hsiao-Ming; Both, Stefan

    2013-10-01

    Studies suggest that anterior beams with in vivo range verification would improve rectal dosimetry in proton therapy for prostate cancer. We investigated whether prostate-rectum spacers would enhance or diminish the benefits of anterior proton beams in these treatments. Twenty milliliters of hydrogel was injected between the prostate and rectum of a cadaver using a transperineal approach. Computed tomography (CT) and magnetic resonance (MR) images were used to generate 7 uniform scanning (US) and 7 single-field uniform dose pencil-beam scanning (PBS) plans with different beam arrangements. Pearson correlations were calculated between rectal, bladder, and femoral head dosimetric outcomes and beam arrangement anterior scores, which characterize the degree to which dose is delivered anteriorly. The overall quality of each plan was compared using a virtual dose-escalation study. For US plans, rectal mean dose was inversely correlated with anterior score, but for PBS plans there was no association between rectal mean dose and anterior score. For both US and PBS plans, full bladder and empty bladder mean doses were correlated with anterior scores. For both US and PBS plans, femoral head mean doses were inversely correlated with anterior score. For US plans and a full bladder, 4 beam arrangements that included an anterior beam tied for the highest maximum prescription dose (MPD). For US plans and an empty bladder, the arrangement with 1 anterior and 2 anterior oblique beams achieved the highest MPD in the virtual dose-escalation study. The dose-escalation study did not differentiate beam arrangements for PBS. All arrangements in the dose-escalation study were limited by bladder constraints except for the arrangement with 2 posterior oblique beams. The benefits of anterior proton beams in the setting of prostate-rectum spacers appear to be proton modality dependent and may not extend to PBS.

  10. Depth Profiling Photoelectron-Spectroscopic Study of an Organic Spin Valve with a Plasma-Modified Pentacene Spacer

    E-Print Network [OSTI]

    Lin, Minn-Tsong

    Depth Profiling Photoelectron-Spectroscopic Study of an Organic Spin Valve with a Plasma) in an organic spin valve with an oxygen plasma-treated pentacene (PC) spacer. The spin valve containing PC and in turn to enhance the MR performance in organic spin valves. INTRODUCTION Organic semiconductors (OSC

  11. Modifications to Replacement Costs System

    SciTech Connect (OSTI)

    Godec, M. [ICF Resources, Inc., Fairfax, VA (United States)

    1989-05-18

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985.

  12. Action and Inaction Levels in Pest Management. 

    E-Print Network [OSTI]

    Sterling, Winfield

    1984-01-01

    to this problem be to use the term "action level" as a replacement term "economic threshold" and the term "inac level" for the critical natural enemy densities (134). terms are more fitting because economic and factors are both important in pest manage dec... component of level model. If the plant has reserves of n sufficient time remaining during the growing replace damaged fruit , then a higher action level be set. The effect of leaf damage as related phenological stage of cotton plant growth is ill...

  13. Alternative process for thin layer etching: Application to nitride spacer etching stopping on silicon germanium

    SciTech Connect (OSTI)

    Posseme, N., E-mail: nicolas.posseme@cea.fr; Pollet, O.; Barnola, S. [CEA-LETI-Minatec, 17 rue des martyrs, 38054 Grenoble cedex 09 (France)

    2014-08-04

    Silicon nitride spacer etching realization is considered today as one of the most challenging of the etch process for the new devices realization. For this step, the atomic etch precision to stop on silicon or silicon germanium with a perfect anisotropy (no foot formation) is required. The situation is that none of the current plasma technologies can meet all these requirements. To overcome these issues and meet the highly complex requirements imposed by device fabrication processes, we recently proposed an alternative etching process to the current plasma etch chemistries. This process is based on thin film modification by light ions implantation followed by a selective removal of the modified layer with respect to the non-modified material. In this Letter, we demonstrate the benefit of this alternative etch method in term of film damage control (silicon germanium recess obtained is less than 6?A), anisotropy (no foot formation), and its compatibility with other integration steps like epitaxial. The etch mechanisms of this approach are also addressed.

  14. The Effect of Digital Die Spacer on the Marginal Fit of Cad Pressed Lithium Disilicate Complete Coverage Copings: An SEM Assessment 

    E-Print Network [OSTI]

    Fischer, James

    2015-04-24

    The purpose of this in vitro study was to evaluate the marginal fit of pressed IPS e.max copings fabricated from a computer-aided designed and milled PMMA acrylic resin burnout coping of various cement spacer thicknesses. ...

  15. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  16. ³Ni² Clusterbank Replacement Project | Argonne Leadership Computing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ni Clusterbank Replacement Project Event Sponsor: Argonne Leadership Computing Facility Seminar Start Date: Oct 20 2015 - 12:00pm BuildingRoom: Building 241Room D173...

  17. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Powerhouse 1 Main Unit Breakers and Station Service Replacement This proposed investment addresses issues with two groups of equipment in Powerhouse 1 at Bonneville: * Main unit...

  18. LED Replacements for Linear Fluorescent Lamps Webcast

    Broader source: Energy.gov [DOE]

    In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

  19. USING NEURAL NETWORKS FOR WEB PROXY CACHE REPLACEMENT

    E-Print Network [OSTI]

    ElAarag, Hala

    USING NEURAL NETWORKS FOR WEB PROXY CACHE REPLACEMENT by JAKE COBB Advisor HALA ELAARAG A senior................................................................................................... 10 4. NEURAL NETWORK PROXY CACHE REPLACEMENT .................................. 12 5. SIMULATION replacement is developed. Unlike previous approaches, this research utilizes neural networks for replacement

  20. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  1. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach HomeA Better Anode Design to Improve4AJ01) (See Energy Level79AJ01) (NotAdvanced ABSTRACTSFor-1 ACTION

  2. Corrective Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room News PublicationsAuditsClusterInformationContractCorporate Culture | NationalCorrective Action

  3. MoO3 as combined hole injection layer and tapered spacer in combinatorial multicolor microcavity organic light emitting diodes

    SciTech Connect (OSTI)

    Liu, R.; Xu, Chun; Biswas, Rana; Shinar, Joseph; Shinar, Ruth

    2011-09-01

    Multicolor microcavity ({mu}C) organic light-emitting diode (OLED) arrays were fabricated simply by controlling the hole injection and spacer MoO{sub 3} layer thickness. The normal emission was tunable from {approx}490 to 640 nm and can be further expanded. A compact, integrated spectrometer with two-dimensional combinatorial arrays of {mu}C OLEDs was realized. The MoO{sub 3} yields more efficient and stable devices, revealing a new breakdown mechanism. The pixel current density reaches {approx}4 A/cm{sup 2} and a maximal normal brightness {approx}140 000 Cd/m{sup 2}, which improves photoluminescence-based sensing and absorption measurements.

  4. Replacement solvents for use in chemical synthesis

    DOE Patents [OSTI]

    Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

    2001-05-15

    Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

  5. Marin County- Wood Stove Replacement Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Homes in the San Geronimo Valley (Forest Knolls, Lagunitas, San Geronimo, and Woodacre) can receive a rebate of $1,500 for the removal and replacement of non-certified wood burning appliances with...

  6. A replaceable reflective film for solar concentrators

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  7. Request for Salary Action Requesting action

    E-Print Network [OSTI]

    Arnold, Jonathan

    Request for Salary Action Requesting action: Above "annual entry maximum" Mid-year increase Promotional salary increase exception Counter offer Salary supplement Other Jan. 28 2015 Tracking number Date

  8. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This...

  9. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications...

  10. Nashville Gas treads carefully to replace pipe

    SciTech Connect (OSTI)

    1997-06-01

    The private gas utility, Nashville Gas, was responsible for replacing damaged or inadequate 2- and 4-inch steel gas lines beneath Music City, USA. The line replacements required either size for size or upsizing. The first choice was directional drilling, which was quickly determined to be unpractical because of rocky soil conditions. The second option was open trenching. Undoubtedly, trenching would mean having to contend with angry residents and tourists, since gas lines ran beneath yards, mature trees, sidewalks, roadways, and railways. In addition to the negative social factors, trenching would require additional funds for substantial landscaping and pavement replacement. It at all possible, a no-dig alternative was desired. Nashville Gas found Grundomat piercing tools which create a bore, then pushes pipe back through it. These same tools can simultaneously pull in pipe. These tools were customized for the Nashville project.

  11. Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions

    E-Print Network [OSTI]

    Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions identified and limited the vessels that could be used to fish for certain species of BSAI groundfish in a particular sector of the groundfish fishery. The final rule included this vessel restriction based on NMFS

  12. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  13. Beyond the Replacement Paradigm: Smart Lighting

    E-Print Network [OSTI]

    Salama, Khaled

    Hole? · DC device in an AC Powered World · Cool light source with thermal issues · High Efficacy ­ High Spectral Density Information Informationneeded to makethe Light SMART #12;10 Light Flow ­ InformationBeyond the Replacement Paradigm: Smart Lighting Robert F. Karlicek, Jr. Director, Smart Lighting

  14. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    SciTech Connect (OSTI)

    Baker, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  15. Climate change action plan

    E-Print Network [OSTI]

    Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

  16. Replaces EIA-459E OMB Control No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7, 2015 ThermochemEnergyReplacement of3

  17. Retail Replacement Lamps | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale PowerNaturalEnergyResuming OperationsOperated

  18. 2014 Joint Action Workshop

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Joint Action Workshop is an annual event for joint action agencies and their members to meet informally and discuss emerging policy, regulatory, and power supply issues, and other topics...

  19. The Gauged Unparticle Action

    E-Print Network [OSTI]

    A. Lewis Licht

    2008-06-24

    We show that the unparticle action that is made gauge invariant by the inclusion of an open Wilson line factor can be transformed into the integral-differential operator action that avoids the use of the Wilson line factor. The two forms of the action should therefore give the same Feynman diagrams. We also show that it is relatively easy to construct Feynman diagrams using the operator action.

  20. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs...

  1. Electrical Equipment Replacement: Energy Efficiency versus System Compatibility 

    E-Print Network [OSTI]

    Massey, G. W.

    2005-01-01

    Electrical equipment components are replaced every day because of failure, obsolescence, or upgrade. Because of technological gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage...

  2. Sampling with unequal probabilities and without replacement 

    E-Print Network [OSTI]

    Kleibrink, Ronald Gus

    1966-01-01

    . 6105 . 5161 . 6210 9 1. 0000 1. 0000 1. 0000 1. 0000 ~ 1796 . 5217 . 7073 . 6105 . 5161 . 5889 Specifically the normalized sizes and cumulative normalized. sizes are defined. as (3. 6) pi = n. xi/X so that N (3. 7) Z p = n 1=1 (3. 8) Pi = E p J... to have given the first general theory for sampling with unequal probabilities and without replacement. They used. as an estimate of the population total I for N units, the standard unbiased estimator A n (1 ' 1) I = Z (y / 77 ) i=3 where 77...

  3. Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

  4. ChangeBehaviors Replace your old toilets and

    E-Print Network [OSTI]

    1 FixLeaks ChangeBehaviors Replace your old toilets and showerheads with water-saver models UseToilets Replace your clothes washer with an Energy StarTM washer PurchaseWater SavingWasher Reduce Water Use inLeaks ChangeBehaviors Replace your old toilets and showerheads with water-saver models Use less water, reuse

  5. Highly Effective Actions

    E-Print Network [OSTI]

    John H. Schwarz

    2013-11-22

    It is conjectured that the world-volume action of a probe D3-brane in an $AdS_5 \\times S^5$ background of type IIB superstring theory, with one unit of flux, can be reinterpreted as the exact effective action (or highly effective action) for U(2), ${\\cal N} = 4$ super Yang-Mills theory on the Coulomb branch. An analogous conjecture for $U(2)_k \\times U(2)_{-k} $ ABJM theory is also presented. The main evidence supporting these conjectures is that the brane actions have all of the expected symmetries and dualities. Highly effective actions have general coordinate invariance, even though they describe nongravitational theories.

  6. Action Item Review and Status

    Office of Environmental Management (EM)

    Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System...

  7. Protective Actions and Reentry

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

  8. Alternatives to proposed replacement production reactors

    SciTech Connect (OSTI)

    Cullingford, H.S.

    1981-06-01

    To insure adequate supplies of plutonium and tritium for defense purposes, an independent evaluation was made by Los Alamos National Laboratory of the numerous alternatives to the proposed replacement production reactors (RPR). This effort concentrated on the defense fuel cycle operation and its technical implications in identifying the principal alternatives for the 1990s. The primary options were identified as (1) existing commercial reactors, (2) existing and planned government-owned facilities (not now used for defense materials production), and (3) other RPRs (not yet proposed) such as CANDU or CANDU-type heavy-water reactors (HWR) for both plutonium and tritium production. The evaluation considered features and differences of various options that could influence choice of RPR alternatives. Barring a change in the US approach to civilian and defense fuel cycles and precluding existing commercial reactors at government-owned sites, the most significant alternatives were identified as a CANDU-type HWR at Savannah River Plant (SRP) site or the Three Mile Island commercial reactor with reprocessing capability at Barnwell Nuclear Fuel Plant and at SRP.

  9. Applications of molecular replacement to G protein-coupled receptors...

    Office of Scientific and Technical Information (OSTI)

    to G protein-coupled receptors The use of molecular replacement in solving the structures of G protein-coupled receptors is discussed, with specific examples being described...

  10. Boron-10 Neutron Detectors for Helium-3 Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Boron-10 Neutron Detectors for Helium-3 Replacement Applications: Portal monitoring Nuclear energy safety and monitoring Nuclear non-proliferation Benefits: Drop-in...

  11. Replace Fossil Fuels, Final Technical Report Roberts, William...

    Office of Scientific and Technical Information (OSTI)

    Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to Replace Fossil Fuels, Final Technical Report Roberts, William L 09 BIOMASS FUELS biofuels, glycerin, glycerol,...

  12. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Value of Program Evaluation Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs A program within the U.S. Environmental...

  13. Plutonium finishing plant safeguards and security systems replacement study

    SciTech Connect (OSTI)

    Klear, P.F.; Humphrys, K.L.

    1994-12-01

    This document provides the preferred alternatives for the replacement of the Safeguards and Security systems located at the Hanford Plutonium Finishing Plant.

  14. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    processes Common cobalt may replace pricier, rare metal relatives Potential applications: biofuel production, carbon dioxide reduction, basic necessary chemistry LOS ALAMOS, N.M.,...

  15. Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    SciTech Connect (OSTI)

    N /A

    2004-08-31

    The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

  16. Sensing Super-position: Visual Instrument Sensor Replacement

    E-Print Network [OSTI]

    Maluf, David A.

    1 Sensing Super-position: Visual Instrument Sensor Replacement David A. Maluf 650-604-0611 David human vision through Sensing Super-position using a Visual Instrument Sensory Organ Replacement (VISOR instruments into sounds, which become relevant when the visual resolution is insufficient for very difficult

  17. Renne Generator Replacement Addendum 1 Page 1 May 28, 2015

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Renne Generator Replacement Addendum 1 Page 1 May 28, 2015 Montana State University Loras O'Toole Project: 14-0105 Renne Library Generator Replacement MECHANICAL AND ELECTRICAL ADDENDUM ITEMS Bidders of the Phasing Notes have been revised to read: a. Section A: Currently the existing indoor generator does

  18. Adhesive High-Level Replacement Categories and Systems

    E-Print Network [OSTI]

    Habel, Annegret

    Adhesive High-Level Replacement Categories and Systems Hartmut Ehrig1 , Annegret Habel2 , Julia.habel@informatik.uni-oldenburg.de Abstract. Adhesive high-level replacement (HLR) categories and sys- tems are introduced as a new of HLR systems with the new concept of adhesive categories introduced by Lack and Soboci

  19. Notices ACTION: Notice.

    Office of Environmental Management (EM)

    8867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  20. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  1. Corrective Action Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-02

    This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

  2. Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    SciTech Connect (OSTI)

    N /A

    2004-08-31

    DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on the analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.

  3. Bondholders and Securities Class Actions

    E-Print Network [OSTI]

    Park, James

    2015-01-01

    2006). 89. See Consolidated Class Action Complaint ¶¶ 42–53,Sept. 30, 2005); Consolidated Class Action Complaint ¶ 1, Inlikely to satisfy various class certification hurdles. See

  4. Climate Action Plan 2013 Update

    E-Print Network [OSTI]

    Rose, Michael R.

    UC Irvine Climate Action Plan 2013 Update #12;CLIMATE ACTION PLAN - 2013 UPDATE 1 TABLE OF CONTENTS CLIMATE PROTECTION GOALS...............................................................18 OPPORTUNITIES-2050 CLIMATE NEUTRALITY.........................................................29 MEDICALCENTER IMPLEMENTATION

  5. ES H action plan

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  6. Topological evolution and photoluminescent properties of a series of divalent zinc-based metal–organic frameworks tuned via ancillary ligating spacers

    SciTech Connect (OSTI)

    Lian, Xiao-Min; Zhao, Wen; Zhao, Xiao-Li

    2013-04-15

    The combination of divalent zinc ions, 4-(4-carboxybenzamido)benzoic acid and exo-bidendate bipyridine ligands gave rise to a series of new MOFs: [ZnL(bipy)]·DMF·H{sub 2}O (1), [ZnL(bpe)]·1.5H{sub 2}O (2), [ZnL(bpa)]·4H{sub 2}O (3) and [ZnL(bpp)]·1.75H{sub 2}O (4) (MOF=metal-organic framework, bipy=4,4?-bipyridine, bpe=trans-1,2-bis(4-pyridyl)ethylene, bpa=1,2-bis(4-pyridinyl)ethane, bpp=1,3-bis(4-pyridinyl)propane, H{sub 2}L=4,4?-(carbonylimino)dibenzoic acid). Fine tune over the topology of the MOFs was achieved via systematically varying the geometric length of the second ligating bipyridine ligands. Single-crystal X-ray analysis reveals that complex 1 has a triply interpenetrated three-dimensional (3D) framework with elongated primitive cubic topology, whereas isostructural complexes 2 and 3 each possesses a 6-fold interpenetrated diamondiod 3D framework. Further expansion of the length of the bipyridine ligand to bpp leads to the formation of 4, which features an interesting entangled architecture of 2D?3D parallel polycatenation. In addition, the thermogravimetric analyses and solid-state photoluminescent properties of the selected complexes are investigated. - Graphical abstract: The incorporation of exo-bidendate bipyridine spacers into the Zn–H{sub 2}L system has yielded a series of new MOFs exhibiting topological evolution from 3-fold interpenetration to 6-fold interpenetration and 2D?3D parallel polycatenation. Highlights: ? The effect of the pyridyl-based spacers on the formation of MOFs was explored. ? Fine tune over the topology of the MOFs was achieved. ? An interesting structure of 2D?3D parallel polycatenation is reported.

  7. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  8. Replace Pressure-Reducing Valves with Backpressure Turbogenerators

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  9. Laboratory Evaluation of LED T8 Replacement Lamp Products

    SciTech Connect (OSTI)

    Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

    2011-05-23

    A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

  10. Developing a total replacement cost index for suburban office projects

    E-Print Network [OSTI]

    Hansen, David John, S.M. Massachusetts Institute of Technology

    2006-01-01

    Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

  11. Drop-in replacement biofuels : meeting the challenge

    E-Print Network [OSTI]

    Bhargava, Alok (Alok Kishore)

    2011-01-01

    This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

  12. EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

  13. Washington State Department of Ecology: Replacement Wells Requiring...

    Open Energy Info (EERE)

    Washington State Department of Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther:...

  14. Replacement-2-A Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power

  15. Replacement-3 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale

  16. Conjugate flow action functionals

    E-Print Network [OSTI]

    Daniele Venturi

    2013-10-15

    We present a new general method to construct an action functional for a non-potential field theory. The key idea relies on representing the governing equations of the theory relative to a diffeomorphic flow of curvilinear coordinates which is assumed to be functionally dependent on the solution field. Such flow, which will be called the conjugate flow of the theory, evolves in space and time similarly to a physical fluid flow of classical mechanics and it can be selected in order to symmetrize the Gateaux derivative of the field equations with respect to suitable local bilinear forms. This is equivalent to requiring that the governing equations of the field theory can be derived from a principle of stationary action on a Lie group manifold. By using a general operator framework, we obtain the determining equations of such manifold and the corresponding conjugate flow action functional. In particular, we study scalar and vector field theories governed by second-order nonlinear partial differential equations. The identification of transformation groups leaving the conjugate flow action functional invariant could lead to the discovery of new conservation laws in fluid dynamics and other disciplines.

  17. CLOSEOUT REPORT REMEDIAL ACTION

    E-Print Network [OSTI]

    FINAL CLOSEOUT REPORT REMEDIAL ACTION AREA OF CONCERN 6 BUILDING 650 RECLAMATION FACILITY SUMP York 11973 REGISTERED TO ISO 14001 #12;AOC 6 BUILDING 650 RECLAMATION FACILITY SUMP AND SUMP OUTFALL .................................................................................9 2.6.1 Final Radiological Status Survey Design

  18. Wthin A Nanometer of Your Life Allen J. Menezes, Vik J. Kapoor, Vijay K. Goel, Brent D. Cameron, and Jian-yu Lu

    E-Print Network [OSTI]

    Lu, Jian-yu

    in replacement discs for the spinal column. The replacement acts as a spacer in support of the vertebral body

  19. Policy Flash 2015-02- INCREMENTALLY FUNDING FIXED-PRICE ACTIONS Revised

    Broader source: Energy.gov [DOE]

    The purpose of this Flash is to inform you of a revision to Acquisition Letter AL2015-01, titled Incrementally Funding Fixed-Price Actions. The revision appears in the “What Guidance is included in this AL?” section under its “Approval” subsection. The revised language appears in italics. The revision grants authority to a Head of Contracting Activity to approve incremental funding of fixed-price actions for actions within his/her approval authority. The resulting Acquisition Letter is Acquisition Letter AL2015-01R. It replaces Acquisition Letter AL2015-01

  20. Climate Action Plan 2009 Sustainability

    E-Print Network [OSTI]

    Capogna, Luca

    Climate Action Plan September 2009 Sustainability Council This plan outlines methods by which. This document is publicly available at http://sustainability.uark.edu. #12;2 University of Arkansas Climate....................................................................................................................................7 Climate Action Plan Committee

  1. RCRA corrective action and closure

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators` interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE`s permitted facilities and interim status facilities.

  2. Securities Class Actions and Bankrupt Companies

    E-Print Network [OSTI]

    Park, James J.

    2014-01-01

    the utility of securities class actions. Certainly, contextthe merit of securities class actions. UCLA | SCHOOL OF LAWof James J. Park, Securities Class Actions and Bankrupt

  3. Testing Fermion Actions: Scaling in the Schwinger Model

    E-Print Network [OSTI]

    Nils Christian; Karl Jansen; Kei-ichi Nagai; Beatrix Pollakowski

    2005-10-07

    We test the scaling behaviour of Wilson, hypercube, maximally twisted mass and overlap fermion actions in dynamical simulations of the 2-dimensional massive Schwinger model. We also present possibilities to simulate overlap fermions dynamically by replacing the exact overlap operator by an approximate version. This approximation is used either as only the guidance Hamiltonian, keeping the exact overlap operator as the accept/reject Hamiltonian or for both, the guidance and accept/reject Hamiltonian in the Hybrid Monte Carlo algorithm. In the latter case we test whether the approximation error can be corrected for by computing the determinant ratio of the exact and the approximate overlap operators stochastically.

  4. CALiPER Special Summary Report: Retail Replacement Lamp Testing

    SciTech Connect (OSTI)

    2011-04-01

    CALiPER testing has evaluated many products for commercial lighting markets and found some excellent performers. However, many of these are not available on the retail market. This special testing was undertaken to identify and test solid-state lighting (SSL) replacement lamp products that are available to the general public through retail stores and websites.

  5. Replacing the whole barrel of oil with plants and microbes

    SciTech Connect (OSTI)

    Simmons, Blake

    2013-05-29

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  6. Replacing the whole barrel of oil with plants and microbes

    ScienceCinema (OSTI)

    Simmons, Blake

    2014-06-24

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  7. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect (OSTI)

    Hernandez, Adriana

    2012-09-21

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  8. Measure Guideline. Wood Window Repair, Rehabilitation, and Replacement

    SciTech Connect (OSTI)

    Baker, P.; Eng, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  9. CALiPER Exploratory Study Retail Replacement Lamps – 2011

    SciTech Connect (OSTI)

    2012-04-02

    In 2010, CALiPER conducted a study on LED replacement lamps found in retail stores. The results were less than satisfactory, and many products were classified as being unlikely to meet consumer expectations. In November 2011, CALiPER purchased a new sample of products for a follow-up study, with the intent of characterizing the progress of this essential market segment.

  10. Brief Report Replacement of Adenovirus Type 5 Fiber Shaft

    E-Print Network [OSTI]

    Hemminki, Akseli

    Brief Report Replacement of Adenovirus Type 5 Fiber Shaft Heparan Sulfate Proteoglycan-binding domain of the fiber shaft to GATK results in liver transduction detargeting, but it is not compatible shaft location efficiently enhances the infectivity of adenovirus and improves the tumor

  11. FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL

    E-Print Network [OSTI]

    Vįzquez-Abad, Felisa J.

    @iro.umontreal.ca SYNOPTIC ABSTRACT We consider a multicomponent system with identical components subject to failures­ generative simulation, maintenance models, age replacement policies. #12; L'ECUYER, MARTIN, AND V ' AZQUEZ­ABAD 1. INTRODUCTION We consider a system with M identical components subject to failures. Each time

  12. Selection and Implementation of a Replacement Cutting Tool Selection Application

    SciTech Connect (OSTI)

    Rice, Gordon

    2008-10-06

    A new commercial cutting tool software package replaced an internally created legacy system. This report describes the issues that surfaced during the migration and installation of the commercial package and the solutions employed. The primary issues discussed are restructuring the data between two drastically different database schemas and the creation of individual component graphics.

  13. Replacement of alloy 800H superheated steam line

    SciTech Connect (OSTI)

    Barbier, R.A.; Bullock, J.W. [Sterling Chemicals, Texas City, TX (United States)

    1996-07-01

    Sterling Chemicals utilizes alloy 800HT (UNS N08811) piping for superheated steam service in its styrene dehydrogenation unit. An engineering project to replace these lines was recently completed. Material acquisition, shop fabrication, inspection requirements, and field erection will be highlighted in this paper.

  14. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  15. Critical Legal Consciousness in Action

    E-Print Network [OSTI]

    Cummings, Scott L

    2007-01-01

    www.ufcw.org/take_action/walmart_workers_campaign_info/Editorial, Global Retailing: WalMart’s Waterloo, Guardian (Buffer Zones Would Prevent Walmart, Others, Park La Brea

  16. JAS - a Java action semantics

    E-Print Network [OSTI]

    Brown, D.F.; Watt, D.A.

    Brown,D.F. Watt,D.A. Proceedings of 2nd International Workshop on Action Semantics pp 43-56 Dept of Computer Science, University of Aarhus

  17. QCD Thermodynamics with Improved Actions

    E-Print Network [OSTI]

    Karsch, Frithjof; Engels, J; Joswig, R; Laermann, E; Peikert, A; Petersson, B

    1996-01-01

    The thermodynamics of the SU(3) gauge theory has been analyzed with tree level and tadpole improved Symanzik actions. A comparison with the continuum extrapolated results for the standard Wilson action shows that improved actions lead to a drastic reduction of finite cut-off effects already on lattices with temporal extent $N_\\tau=4$. Results for the pressure, the critical temperature, surface tension and latent heat are presented. First results for the thermodynamics of four-flavour QCD with an improved staggered action are also presented. They indicate similarly large improvement factors for bulk thermodynamics.

  18. OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement

    Broader source: Energy.gov [DOE]

    With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

  19. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  20. Trenchless rehabilitation: Which choice for gas distribution pipe replacement?

    SciTech Connect (OSTI)

    Kramer, S.R. [Jason Consultants International, Washington, DC (United States); Gauthier, S.W. [Gas Research Inst., Chicago, IL (United States)

    1995-01-01

    Replacement or rehabilitation of deteriorating gas piping currently relies largely on open-cut excavation or pipe insertion. Open-cut replacement is satisfactory for communities where adverse environmental impact can be tolerated and road closures and traffic delays are kept to a minimum. However, most of the systems in need of replacement/rehabilitation are in urban areas where environmental impact, traffic delays, and site restoration costs are costly. With these parameters in mind, the Gas Research Institute (GRI); and its member organizations designed a research program to test and evaluate promising trenchless technologies for potential use in gas distribution rehabilitation projects. The programs`s goals were to identify product strengths, weaknesses, cost, applications, and recognition of areas which needed modification or further development. During this research a significant amount of data were gathered. All rehabilitation systems maximize pipe capacity while minimizing surface disruptions. Cost savings realized by some of the participating utilities was significant. This is even more impressive when one considers that this was the first gas installation for some of the methods. A summary of advantages, disadvantages, and lessons learned from each process is shown on Tables 2--6. Comments listed are for field trials conducted and may not be accurate or applicable to other projects. A common limitation of all rehabilitation methods is lack of a complete system with appropriate tees, fittings, transition materials, and other connection devices.

  1. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  2. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  3. C:\\Temp_jhd\\spacers\\spacers_wa_2014.prn

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at time of production. It does not represent any legal information or boundaries. BPA GIS Database, 2013. 0 10 20 30 40 Miles N January 27, 2014 bud.bpa.govwggisgisdata2...

  4. C:\\Temp_jhd\\spacers\\spacers_or_2014.prn

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    created with best available data at time of production. It does not represent any legal information or boundaries. BPA GIS Database, 2013. 0 10 20 30 40 Miles N January 27, 2014...

  5. Discussion: Week 2. Evaluating green actions

    E-Print Network [OSTI]

    Gille, Sarah T.

    housing for people who can't afford it, installing solar hot water heaters to replace diesel systems

  6. BIOMASS ACTION PLAN FOR SCOTLAND

    E-Print Network [OSTI]

    BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

  7. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1996--June 1996

    SciTech Connect (OSTI)

    1996-08-01

    This document summarizes significant enforcement actions that have been resolved during the period of January-June 1996. The report includes copies of Orders and Notices of Violations sent by the Nuclear Regulatory Commission to individuals with respect to the enforcement actions.

  8. Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

  9. Influence of biphenyl spacer appended to the flexible phosphonate arms in modulating the dimensionality of the coordination polymers: Synthesis, structural chemistry and magnetic properties

    SciTech Connect (OSTI)

    Tripuramallu, Bharat Kumar; Das, Samar K.

    2013-01-15

    Two new compounds [Co (2,2 Prime -bipy) (H{sub 2}dbp)]{sub n} (1) and [Ni (2,2 Prime -bipy){sub 2}(H{sub 2}dbp)(H{sub 2}O)]{center_dot}H{sub 2}O (2) based on the flexible ligand 4,4 Prime -dimethylenebiphenyldiphosphonic acid (H{sub 4}dbp) with 2,2 Prime -bipyridine as secondary ligand have been synthesized under hydrothermal conditions. Both the compounds are well characterized by routine elemental analysis, IR, electronic spectroscopies, thermogravimetric analysis and finally by single crystal X-ray diffraction analysis. Compound 1 is a 1D extended coordination polymer and 2 is a discrete molecular compound. A comparative study between the geometries of H{sub 4}dbp ligand (in compounds 1 and 2, present study) and p-xylylenediphosphonic acid (H{sub 4}pxp) ligand (in previously reported compounds [Cu(2,2 Prime -bipy)(H{sub 2}pxp)]{center_dot}nH{sub 2}O (1A) and Ni(2,2 Prime -bipy){sub 2}H{sub 4}pxp]{sub n}[H{sub 2}pxp]{sub n} (2A), see text) demonstrate the effect of the twisting in the benzene rings in changing higher dimensional H{sub x}pxp (x refers to number of protonated hydroxyl groups) compounds to lower dimensional H{sub x}dbp compounds. The eight membered Co-dimer rings formed in compound 1 represents the simple and isolated Co-dimer, exhibiting weak antiferromagnetic exchange between metal centers through OPO bridges. - Graphical abstract: Two new compounds based on the dimethylenebiphenyldiphosphonic acid have been synthesized. The effect of twisting of benzene rings in the biphenyl spacer containing multidentate ligands alters dimensionality of final compounds. Highlights: Black-Right-Pointing-Pointer Cobalt containing coordination polymer and a nickel discrete compound have been synthesized. Black-Right-Pointing-Pointer Flexible ligand 4,4'-dimethylenebiphenyldiphosphonic acid has been employed. Black-Right-Pointing-Pointer Co(II) and Ni(II) ions are square pyramidal and octahedral respectively. Black-Right-Pointing-Pointer The effect of the twisting in the benzene rings in the associated ligand has been demonstrated.

  10. Is it Cost-Effective to Replace Old Eddy-Current Drives? | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Is it Cost-Effective to Replace Old Eddy-Current Drives? Is it Cost-Effective to Replace Old Eddy-Current Drives? New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may...

  11. Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project

    SciTech Connect (OSTI)

    Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

    2011-01-04

    CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

  12. Electronic-type vacuum gauges with replaceable elements

    DOE Patents [OSTI]

    Edwards, D. Jr.

    1984-09-18

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge. 5 figs.

  13. Electronic-type vacuum gauges with replaceable elements

    DOE Patents [OSTI]

    Edwards, Jr., David (7 Brown's La., Bellport, NY 11713)

    1984-01-01

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge.

  14. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  15. CALiPER Benchmark Report: Performance of Halogen Incandescent MR16 Lamps and LED Replacement

    SciTech Connect (OSTI)

    None

    2008-11-01

    This benchmark report addresses the halogen MR16 lamp and its commercially available light-emitting diode (LED) replacements.

  16. Inspector General audit report on Transportation Safeguards Division courier work schedules and escort vehicle replacements

    SciTech Connect (OSTI)

    NONE

    1998-12-01

    The Office of Inspector General`s (OIG) April 1995 report found that couriers received too much overtime and incurred too much unproductive time. This finding occurred because the Transportation Safeguards Division (TSD) employed a traditional work schedule that did not meet the demands of the job. The report recommended implementing an alternative work schedule that corresponded more closely to the couriers` actual work requirements. Management agreed to conduct a comparative analysis of work schedules to evaluate potential savings. The objectives of this audit were to (1) follow up on actions taken as a result of the OIG`s previous report, (2) determine if courier work schedules are cost effective, and (3) determine the cost effectiveness of escort vehicle replacements. The authors recommend: (1) implementing an alternative work schedule for courier which would achieve savings in overtime and unproductive time, while efficiently and cost effectively fulfilling TSD`s mission; (2) reexamining and adjusting the staffing level of each courier section in relation to the workload requirements in the area; and (3) discontinuing payment for travel time between courier lodging and temporary duty stations. The Albuquerque Operations Office agreed with the auditor`s findings and recommendations.

  17. Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA

    E-Print Network [OSTI]

    Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

  18. Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement

    E-Print Network [OSTI]

    Berlin,Technische Universität

    Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement Peter Jülg, Sason von der Heyde Purpose: Within the EU-funded research project LifeValve the German for the replacement of pulmonary heart valves. This technique is a minimally invasive alternative to the replacement

  19. Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions

    E-Print Network [OSTI]

    Montes-Hernandez, German

    Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions Romain Available online 8 March 2012 Keywords: A1. Mineral replacement rate A1. Serpentinization A1. TG analyses B1. Alkaline medium B2. Chrysotile nanotubes a b s t r a c t Olivine mineral replacement by serpentine is one

  20. Final Independent External Peer Review Report Olmsted Locks and Dam 52 and 53 Replacement

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Final Independent External Peer Review Report Olmsted Locks and Dam 52 and 53 Replacement Project Review Report Olmsted Locks and Dam 52 and 53 Replacement Project Updated Cost Estimate Peer Review and Dam 52 and 53 Replacement Project Updated Cost Estimate Peer Review EXECUTIVE SUMMARY Project

  1. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1995-09-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated.

  2. ICDF Complex Remedial Action Report

    SciTech Connect (OSTI)

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  3. 2010 Climate Action Plan Environmental

    E-Print Network [OSTI]

    Capecchi, Mario R.

    2010 Climate Action Plan Energy and Environmental Stewardship Initiative: Prepared by: The Office.........................................................................................................................17 4A. Curriculum, Education, and Research environmental stewardship and reduces our own carbon footprint on campus. Through the U's Office

  4. Nuclear criticality safety assessment of the proposed CFC replacement coolants

    SciTech Connect (OSTI)

    Jordan, W.C.; Dyer, H.R.

    1993-12-01

    The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

  5. Operational Readiness Review: Savannah River Replacement Tritium Facility

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

  6. UCSF Sustainability Action Plan: Executive Summary

    E-Print Network [OSTI]

    Yamamoto, Keith

    UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

  7. Worldwide Energy Efficiency Action through Capacity Building...

    Open Energy Info (EERE)

    Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and...

  8. DOE Announces Additional Energy Efficiency Enforcement Action...

    Office of Environmental Management (EM)

    Energy Efficiency Enforcement Action to Protect Consumers DOE Announces Additional Energy Efficiency Enforcement Action to Protect Consumers January 7, 2010 - 12:00am Addthis...

  9. Energy Agency Coordinators for Energy Action Month

    Broader source: Energy.gov [DOE]

    Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

  10. Environmental Management Headquarters Corrective Action Plan...

    Office of Environmental Management (EM)

    I Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase I The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of...

  11. RCRA corrective action determination of no further action

    SciTech Connect (OSTI)

    1996-06-01

    On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.

  12. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

    SciTech Connect (OSTI)

    Krementz, D.; Coughlin, Jeffrey

    2009-05-05

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

  13. Texas Solar Collaboration Action Plan

    SciTech Connect (OSTI)

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  14. FUSION ENERGY Actions Needed to

    E-Print Network [OSTI]

    's construction costs through contributions of hardware, personnel, and cash, and DOE is responsible for managing was asked to review DOE's cost and schedule estimates for the U.S. ITER Project. This report examines (1) the reliability of DOE's current cost and schedule estimates, and (3) actions DOE has taken to reduce U.S. ITER

  15. Climate Change Action Plan Report

    E-Print Network [OSTI]

    Hansen, Andrew J.

    Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

  16. Action Required An extra layer

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Action Required An extra layer of protection m A Securian Company State of Florida Group Term Life by Minnesota Life Insurance Company, at rates negotiated exclusively for employees of the State of Florida's right for you and your family, it's important to think about the amount of money your family would need

  17. Replacing precious metals with carbide catalysts for hydrogenation reactions

    SciTech Connect (OSTI)

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  18. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology; Columbia Univ., New York, NY (United States); Chen, Jingguang G. [Columbia Univ., New York, NY (United States); Brookhaven National Lab. (BNL), Upton, NY (United States); Chang, Kuan [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology; Wang, Tiefeng [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology

    2015-04-01

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  19. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Nimore »modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.« less

  20. Polymeric materials replacement issues for the LANL stockpile.

    SciTech Connect (OSTI)

    Sandoval, C. W. (Cynthia W.); Gladysz, G. M. (Gary M.); Stephens, T. S. (Thomas S.); Gleiman, S. S. (Seth S.); Mendoza, D. (Daniel); Baker, G. K. (G. Keith); Schoonover, J. R. (Jon R.); Schneider, Jim; Perry, B. (Brian); Lula, J. W.

    2002-01-01

    A number of materials in the LANL stockpile are no longer available due to lack of availability or environment, safety and health issues. Silastic S-5370 a polysiloxane foam used to manufacture multiple components in LANL systems has been discontinued by Dow Corning. Kerimid 601 is a polyimide resin used as the binder for the syntactic foam used as a support material in the W76. It contains MDA, which has been identified by OSHA as a carcinogen and is no longer used in the nuclear weapons complex. In addition, the Thornel carbon mat used in the syntactic foam formulation is no longer available. These issues have created major challenges in the effort to reestablish aft support production capability for the W76 LEP. Urethane Encapsulant 7200, an adhesive used to bond explosive booster pellets and detonator components, was originally manufactured by Hexcel Corporation and is no longer available. The details of the projects currently underway to provide replacements for these materials will be discussed.

  1. Percutaneous aortic valve replacement in a re-animated postmortem heart

    E-Print Network [OSTI]

    White, Jennifer; Sun, Amy; Killien, Lauren; Evangelista, Dennis

    2006-01-01

    implantation of heart valve prosthesis for the treatment ofF. Percutaneous aortic valve replacement: an experimentalA stentless trileaflet valve from a sheet of decellularized

  2. Is it Cost-Effective to Replace Old Eddy-Current Drives? - Motor Tip Sheet #12

    SciTech Connect (OSTI)

    2008-07-01

    New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may be cost-effective replacements for aging or maintenance-intensive eddy-current drives.

  3. CALiPER Benchmark Report: Performance of Incandescent A Type and Decorative Lamps and LED Replacements

    SciTech Connect (OSTI)

    None

    2008-11-01

    This benchmark report addresses common omnidirectional incandescent lamps - A-type and small decorative, candelabra-type lamps - and their commercially available light-emitting diode (LED) replacements.

  4. Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®

    Office of Energy Efficiency and Renewable Energy (EERE)

    Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

  5. Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)

    SciTech Connect (OSTI)

    McBride, K.C.; Russell, V.K.

    1994-10-04

    This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

  6. Is it Cost-Effective to Replace Old Eddy-Current Drives?

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (PWM) variable frequency drives (VFD) may be cost- effective replacements for aging or high-maintenance eddy-current drives that are used with variable torque loads, such...

  7. Action

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReporteeo | National Nuclear Securityhr INITIATED| NationalRegister

  8. Model morphing and sequence assignment after molecular replacement

    SciTech Connect (OSTI)

    Terwilliger, Thomas C., E-mail: terwilliger@lanl.gov [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States); Read, Randy J. [University of Cambridge, Cambridge Institute for Medical Research, Cambridge CB2 0XY (United Kingdom); Adams, Paul D. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Brunger, Axel T. [Stanford University, 318 Campus Drive West, Stanford, CA 94305 (United States); Afonine, Pavel V. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Hung, Li-Wei [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States)

    2013-11-01

    A procedure for model building is described that combines morphing a model to match a density map, trimming the morphed model and aligning the model to a sequence. A procedure termed ‘morphing’ for improving a model after it has been placed in the crystallographic cell by molecular replacement has recently been developed. Morphing consists of applying a smooth deformation to a model to make it match an electron-density map more closely. Morphing does not change the identities of the residues in the chain, only their coordinates. Consequently, if the true structure differs from the working model by containing different residues, these differences cannot be corrected by morphing. Here, a procedure that helps to address this limitation is described. The goal of the procedure is to obtain a relatively complete model that has accurate main-chain atomic positions and residues that are correctly assigned to the sequence. Residues in a morphed model that do not match the electron-density map are removed. Each segment of the resulting trimmed morphed model is then assigned to the sequence of the molecule using information about the connectivity of the chains from the working model and from connections that can be identified from the electron-density map. The procedure was tested by application to a recently determined structure at a resolution of 3.2 Å and was found to increase the number of correctly identified residues in this structure from the 88 obtained using phenix.resolve sequence assignment alone (Terwilliger, 2003 ?) to 247 of a possible 359. Additionally, the procedure was tested by application to a series of templates with sequence identities to a target structure ranging between 7 and 36%. The mean fraction of correctly identified residues in these cases was increased from 33% using phenix.resolve sequence assignment to 47% using the current procedure. The procedure is simple to apply and is available in the Phenix software package.

  9. Action Sheet 36 Final Report

    SciTech Connect (OSTI)

    Kips, R E; Kristo, M J; Hutcheon, I D

    2012-02-24

    Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

  10. Take the Energy Action Challenge

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Students will work in pairs or small groups to apply knowledge of energy-wise habits to evaluate energy use in their homes and schools and make recommendations for improved efficiency. They will use an energy audit tool to collect data on their home and school energy habits and present an action plan to their class. Further communication at the school and district level is encouraged.

  11. EM International Program Action Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|DepartmentStatement |toDepartmentContributesAdvisoryProgram Action

  12. Criminal Justice and Criminology Action Plan Memorandum of Understanding Status of Action Items from Prior Action Plan

    E-Print Network [OSTI]

    Frantz, Kyle J.

    Criminal Justice and Criminology Action Plan Memorandum of Understanding Status of Action Items from Prior Action Plan · Produce a PhD proposal in Criminal Justice. Completed · Redesign the graduate of senior faculty with strong records of obtaining external funding should become a top priority." · "The

  13. ACTION ITEMS STRENGTHENING THE PHYSICS ENTERPRISE

    E-Print Network [OSTI]

    Lozano-Robledo, Alvaro

    1 ACTION ITEMS STRENGTHENING THE PHYSICS ENTERPRISE IN UNIVERSITIES AND NATIONAL LABORATORIES MAY 6 that make demeaning or snide comments, you will find the rewards are great. "Judy Franz, APS #12;3 EXECUTIVE: ACTION ITEMS ..........................................................................5 Physics

  14. Emergence and perceptual guidance of prehensile action 

    E-Print Network [OSTI]

    Smith, Joanne

    2009-01-01

    Successful coordination of prehensile action depends upon the selection and control of appropriate reach and grasp movements. This thesis explores how prehensile actions are shaped and regulated by perceptual information. ...

  15. SEAB Climate Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy. Climate Action Plan...

  16. Category theory based solution for the building block replacement problem in materials design

    E-Print Network [OSTI]

    Spivak, David

    1 Category theory based solution for the building block replacement problem in materials design blocks, theory, modeling, mathematics, hierarchical materials Submitted to: Advanced Engineering be replaced by other molecular structures, such as weak van der Waals or hydrogen bonds, without compromising

  17. Fundamenta Informaticae 72 (2006) 129 1 Adhesive High-Level Replacement Systems

    E-Print Network [OSTI]

    Habel, Annegret

    2006-01-01

    Fundamenta Informaticae 72 (2006) 1­29 1 IOS Press Adhesive High-Level Replacement Systems: A New. Adhesive high-level replacement (HLR) systems are introduced as a new categorical framework for graph with the new concept of adhesive categories introduced by Lack and Soboci´nski. In this paper we show that most

  18. Final Independent External Peer Review Report Olmsted Locks and Dam 52 and 53 Replacement

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Final Independent External Peer Review Report Olmsted Locks and Dam 52 and 53 Replacement Project Review Report Olmsted Locks and Dam 52 and 53 Replacement Project Post Authorization Change Report--0002 Task Order: 0005 #12;This page is intentionally left blank. #12;Olmsted Locks and Dam PACR IEPR i

  19. Building Emergency Action Plan Facility Name: _____________________

    E-Print Network [OSTI]

    Powers, Robert

    Building Emergency Action Plan (Template) Facility Name: _____________________ Date Prepared .....................................................................................................................................................3 2. Building Description..................................................................................................................................3 3. Building Emergency Personnel

  20. Quantum Chaos via the Quantum Action

    E-Print Network [OSTI]

    H. Kröger

    2002-12-16

    We discuss the concept of the quantum action with the purpose to characterize and quantitatively compute quantum chaos. As an example we consider in quantum mechanics a 2-D Hamiltonian system - harmonic oscillators with anharmonic coupling - which is classically a chaotic system. We compare Poincar\\'e sections obtained from the quantum action with those from the classical action.

  1. A New Action for Heavy Lattice Fermions

    E-Print Network [OSTI]

    Paul B. Mackenzie

    1992-12-14

    I describe a unified formalism for lattice fermions, in which the relativistic action of Wilson and the nonrelativistic and static actions appear as special cases. It is valid at all values of $m_q a$, including $m_q a \\approx 1$. In the limit $m_q a \\ll 1 $, the formulation reduces to the light quark action of Wilson. In the limit $m_q a \\gg 1 $, the formulation reduces to the nonrelativistic action of Thacker and Lepage, and to the static action of Eichten.

  2. Corrective Action Tracking System (CATS) | Department of Energy

    Office of Environmental Management (EM)

    Action Tracking System (CATS) Corrective Action Tracking System (CATS) The CATS web-based database is used to enter, track, and report the status of corrective actions...

  3. Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    DOE /NV

    1998-12-08

    This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.

  4. University of California, San Diego Water Action Plan

    E-Print Network [OSTI]

    Gleeson, Joseph G.

    University of California, San Diego Water Action Plan December 20, 2013 #12;i Table of Contents of the Water Action Plan Water Action Plan Committee Regional Scope of the Water Action Plan HISTORICAL PROGRESS IN WATER REDUCTION.......................................................... 5 Campus Irrigation

  5. Library of Science & Medicine Roof Replacement and Related Work Dec. 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work Dec. 11, 2000 DSR # 0059-00 BSH AFFIDAVIT OF NON-USE OF ASBESTOS Project: Roof Replacement and Related Work at LIBRARY OF SCIENCE & MEDICINE

  6. Percutaneous aortic valve replacement in a re-animated postmortem heart

    E-Print Network [OSTI]

    White, Jennifer; Sun, Amy; Killien, Lauren; Evangelista, Dennis

    2006-01-01

    aortic valve replacements, para-valvular leakage wasof valves designed to prevent para-valvular leakage. Multi-leakage was minimal or absent, most likely due to the lack of native valve

  7. Emerging Trends in Heart Valve Engineering: Part III. Novel Technologies for Mitral Valve Repair and Replacement

    E-Print Network [OSTI]

    2015-01-01

    and J. D. Puskas. Mitral-valve repair versus replacement forbioprosthetic heart valves. Ann. Thorac. Surg. 71:S417–mechanics of arti?cial heart valves. Clin. Exp. Pharmacol.

  8. Emerging Trends in Heart Valve Engineering: Part II. Novel and Standard Technologies for Aortic Valve Replacement

    E-Print Network [OSTI]

    2015-01-01

    toronto stentless porcine valve. Ann. Thorac. Surg. 78:2076–medical mechanical cardiac valve prosthesis. Ann. Thorac.or surgical aortic-valve replacement. New Engl. J. Med. 366:

  9. Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reduce U.S. Dependence on Oil Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil Converting domestic biomass into affordable fuels, products, and power supports our...

  10. Replace Pressure-Reducing Valves with Backpressure Turbogenerators - Steam Tip Sheet #20

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  11. Case Study Walnut Hill United Methodist Church - Dallas, Texas, Chiller Replacement Analysis 

    E-Print Network [OSTI]

    Phillips, J.

    1998-01-01

    In March of 1992 Walnut Hill United Methodist Church in Dallas, Tx. decided that their existing thermal storage and electric reciprocating chiller system were both in need of replacement. After analyzing several options, they chose to install 150...

  12. [Minor revisionposted 3/19/15 (replaces 2/7/12 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 10.12 [Minor revision­posted 3/19/15 (replaces 2/7/12 edition)] Operating Policy and Procedure orientation with regard to admission, employment, or use of the programs, facilities, or services of Texas

  13. Replacing cellular with WiFi direct communication for a highly interactive, high bandwidth multiplayer game

    E-Print Network [OSTI]

    Ortiz, Pablo (Pablo Jose)

    2013-01-01

    The objective of this work is to explore the benefits of replacing cellular with Wi-Fi Direct communication in mobile applications. Cellular connections consume significant power on mobile devices and are too slow for many ...

  14. Variation in joint fluid composition and its effect on the tribology of replacement joint articulation

    E-Print Network [OSTI]

    Mazzucco, Daniel Clarke, 1976-

    2003-01-01

    Polyethylene wear is a significant clinical problem limiting the long-term survival of joint replacement prostheses, particularly in total hip arthroplasty (THA) and total knee arthroplasty (TKA). Although the tribology ...

  15. Centrifugal devices can replace traditional separation techniques such as column chromatography, preparative

    E-Print Network [OSTI]

    Lebendiker, Mario

    Centrifugal devices can replace traditional separation techniques such as column chromatography, preparative electrophoresis, alcohol or salt precipitation, dialysis, and gradient centrifugation when. Centrifugal Devices for Ultrafiltration & Microfiltration Nanosep®, MicrosepTM, Macrosep®, and Jumbosep

  16. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  17. Proposal to negotiate an amendment to an existing blanket contract for the repair, recondioning or replacement of klystrons

    E-Print Network [OSTI]

    2012-01-01

    Proposal to negotiate an amendment to an existing blanket contract for the repair, recondioning or replacement of klystrons

  18. Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale50.2

  19. Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A

  20. Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil | Department of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A 4600.4

  1. A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes

    SciTech Connect (OSTI)

    Traceski, Thomas T.

    1994-02-01

    This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

  2. Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring

    E-Print Network [OSTI]

    Ryan, Sarah M.

    Process and Continuous Monitoring Index terms--Optimal replacement, proportional hazards model, semi1 Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate replacement problem for general deteriorating systems in the proportional hazards model with a semi

  3. Abstract--Replacing open-heart surgical procedures with beating-heart interventions substantially decreases the trauma

    E-Print Network [OSTI]

    Dupont, Pierre

    Abstract-- Replacing open-heart surgical procedures with beating-heart interventions substantially on the beating heart is valve repair. To address this need, this paper proposes a tool for replacing mitral valve replacement and reduction of regurgitation was demonstrated in an ex-vivo heart simulator. I. INTRODUCTION UE

  4. Class Action Lawyers: Fools for Clients?

    E-Print Network [OSTI]

    Bergman, Paul

    1980-01-01

    Cir. 1976). 23. See Note, Class Actions-Susman v. Lincolntakes over a case from the class representative is act- ingan active and indepen- dent class representative throughout

  5. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  6. Utilities Working with Industry: Action Plan

    SciTech Connect (OSTI)

    2010-06-25

    This action plan outlines joint ITP and utility activities that will help reach a national goal of reducing energy by 25 percent over then next 10 years.

  7. Calls to Action -- Linking Science to Design

    E-Print Network [OSTI]

    Fraker, Harrison

    2008-01-01

    the National Academy of Design, July 2008. Opposite: FlowAction Linking Science to Design Harrison Fraker Two recentthe fields of science and design. Entitled “Energy, Security

  8. Robotic actions in the human brain Robotic movement preferentially engages the action observation network

    E-Print Network [OSTI]

    Hamilton, Antonia

    Robotic actions in the human brain 1 Robotic movement., Stadler, W. & Prinz, W. (in press / 2011). Robotic movement preferentially engages the action observation network. Human Brain Mapping. #12;Robotic

  9. Graduate Honor System Actions 1999-2000 Case Dept. Charge GHS Action Sanction

    E-Print Network [OSTI]

    Butt, Ali R.

    Graduate Honor System Actions 1999-2000 Case Dept. Charge GHS Action Sanction F1999-01 ECp the Past Four Academic Years Case Outcomes Number of Students Sanctioned Sanction 1996-97 1997-98 1998

  10. Environmental Activism as Collective Action Key words: Environmental activism, environmental behavior, collective action,

    E-Print Network [OSTI]

    Lubell, Mark

    Environmental Activism as Collective Action Key words: Environmental activism, environmental behavior, collective action, environmentalism, collective interest model. Mark Lubell Department The literature on environmental activism has failed to produce a model of individual decision- making explicitly

  11. Rulison Site corrective action report

    SciTech Connect (OSTI)

    NONE

    1996-09-01

    Project Rulison was a joint US Atomic Energy Commission (AEC) and Austral Oil Company (Austral) experiment, conducted under the AEC`s Plowshare Program, to evaluate the feasibility of using a nuclear device to stimulate natural gas production in low-permeability gas-producing geologic formations. The experiment was conducted on September 10, 1969, and consisted of detonating a 40-kiloton nuclear device at a depth of 2,568 m below ground surface (BGS). This Corrective Action Report describes the cleanup of petroleum hydrocarbon- and heavy-metal-contaminated sediments from an old drilling effluent pond and characterization of the mud pits used during drilling of the R-EX well at the Rulison Site. The Rulison Site is located approximately 65 kilometers (40 miles) northeast of Grand Junction, Colorado. The effluent pond was used for the storage of drilling mud during drilling of the emplacement hole for the 1969 gas stimulation test conducted by the AEC. This report also describes the activities performed to determine whether contamination is present in mud pits used during the drilling of well R-EX, the gas production well drilled at the site to evaluate the effectiveness of the detonation in stimulating gas production. The investigation activities described in this report were conducted during the autumn of 1995, concurrent with the cleanup of the drilling effluent pond. This report describes the activities performed during the soil investigation and provides the analytical results for the samples collected during that investigation.

  12. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

  13. UC SAN DIEGO DROUGHT ACTION PLAN

    E-Print Network [OSTI]

    Gleeson, Joseph G.

    UC SAN DIEGO DROUGHT ACTION PLAN 2014 #12;Water at UC San Diego Background Report and Action Strategy for Drought The UC San Diego Campus The UC San Diego La Jolla campus (including Scripps Institution of Oceanography and the UC San Diego Medical Center ­ La Jolla) totals approximately 1,152 acres

  14. A Brief Look At Affirmative Action

    E-Print Network [OSTI]

    Erickson, Nancy Jo

    2007-12-06

    .........................................................................................13 Limitations of This Study ..........................................................................................14 History of Affirmative Action ...................................................................................15 Two Sides... of pertinent information due to the closed nature of the system being studied and the limited amount of information on this specific topic by anthropologists and the anthropological community. 14 History of Affirmative Action In its tumultuous 46-year...

  15. Chemical and Biological Engineering Summary of Actions

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Chemical and Biological Engineering Summary of Actions 2014-2015 Concern Recommendation Action Follow-up 1. The department name is Chemical and Biological Engineering. An analysis of student Biological Engineering programs. 4. The second semester of the senior capstone sequence in Chemical

  16. General Laws for the Action of Diastases

    E-Print Network [OSTI]

    V: Action of amylase on starch 68 §33. Method. H. Brown and Glendinning's research 68 §34. Law for the progress of the hydrolysis of starch by amylase 65 §35. Effect of the amount of starch. Difference between malt amylase and pancreatic juice amylase 68 §36. Theory of the law of action of amylase 72 §37

  17. Patent Issued Additional Office Actions Received

    E-Print Network [OSTI]

    Cui, Yan

    Patent Issued Additional Office Actions Received 3-12 mo. Respond to Office Action Patent attorney The patent examiner provides notification of which claims in the application have been rejected or accepted determines there are multiple inventions in 1 application. Patent Application Published 6 mo. Non

  18. Bishop's University Energy Efficiency Action Plan

    E-Print Network [OSTI]

    global energy consumption by 14% relative to 2002-2003. By 2010 Action 6: Cost evaluation of investments% reduction in energy consumption (GJ / m²) for higher education buildings from 2002-2003 until 2010- 2011 ways to save energy March 2008 Action 3: Snapshot of current energy consumption. Send energy

  19. CLIMATE ACTION PLAN NOVEMBER 10, 2009

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    CLIMATE ACTION PLAN NOVEMBER 10, 2009 SANDY DEJOHN PHYSICAL FACILITIES DEPARTMENT #12;~ i ~ TABLE the American College and University Presidents Climate Commitment, I believe strongly in working to achieve its helped shape and develop the information contained in this Climate Action Plan: (Names listed

  20. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  1. OPEN FORUM -- `Merit' and Affirmative Action

    E-Print Network [OSTI]

    I owe my position in the upper middle class to the fact that in 1970 the ... the Law School Admissions Test and replaced it with verbal logic problems. ... of color especially useful to teams that would otherwise be all or mostly white and male.

  2. Replacement of outboard main steam isolation valves in a boiling water reactor plant

    SciTech Connect (OSTI)

    Schlereth, J.R.; Pennington, D.

    1996-12-01

    Most Boiling Water Reactor plants utilize wye pattern globe valves for main steam isolation valves for both inboard and outboard isolation. These valves have required a high degree of maintenance attention in order to pass the plant local leakage rate testing (LLRT) requirements at each outage. Northern States Power made a decision in 1993 to replace the outboard valves at it`s Monticello plant with double disc gate valves. The replacement of the outboard valves was completed during the fall outage in 1994. During the spring outage in April of 1996 the first LLRT testing was performed with excellent results. This presentation will address the decision process, time requirements and planning necessary to accomplish the task as well as the performance results and cost effectiveness of replacing these components.

  3. Action principle for Coulomb collisions in plasmas

    E-Print Network [OSTI]

    Hirvijoki, Eero

    2015-01-01

    In this letter we derive an action principle for Coulomb collisions in plasmas. Although no natural Lagrangian exists for the Landau-Fokker-Planck equation, an Eulerian variational formulation is found considering the system of partial differential equations that couple the distribution function and the Rosenbluth potentials. Exact conservation laws are derived after generalizing the energy-momentum stress tensor for second order Lagrangians and, in the case of a test-particle population in a given plasma background, the action principle is shown to correspond to the Langevin equation for individual particles. Being suitable for discretization, the presented action allows construction of variational integrators. Numerical implementation is left for a future study.

  4. On QCD Thermodynamics with Improved Actions

    E-Print Network [OSTI]

    Karsch, Frithjof

    1998-01-01

    We discuss recent advances in the calculation of thermodynamic observables using improved actions. In particular, we discuss the calculation of the equation of state of the SU(3) gauge theory, the critical temperature in units of the string tension, the surface tension and the latent heat at the deconfinement transition. We also present first results from a calculation of the equation of state for four-flavour QCD using an O(a^2) improved staggered fermion action and discuss possible further improvements of the staggered fermion action.

  5. Enforcement actions: Significant actions resolved. Volume 14, No. 2, Part 1: Individual actions. Quarterly progress report, April--June 1995

    SciTech Connect (OSTI)

    NONE

    1995-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1995) and includes copies of Orders sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  6. Replaces EIA-459C All Other Editions Are Obsolete OMB Control No.

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A 4600.4 (04-94)

  7. DIVERSITY ACTION PLAN CIVIL & ENVIRONMENTAL ENGINEERING

    E-Print Network [OSTI]

    DIVERSITY ACTION PLAN CIVIL & ENVIRONMENTAL ENGINEERING GRADUATE STUDENT REPORT PREPARED FOR: Civil & Environmental Engineering College of Engineering University of Washington Seattle, Washington of Engineering strategic goals, this report provides Civil and Environmental Engineering (CEE) with detailed

  8. DIVERSITY ACTION PLAN CIVIL & ENVIRONMENTAL ENGINEERING

    E-Print Network [OSTI]

    DIVERSITY ACTION PLAN CIVIL & ENVIRONMENTAL ENGINEERING UNDERGRADUATE STUDENT REPORT PREPARED FOR: Civil & Environmental Engineering College of Engineering University of Washington Seattle, Washington in Civil and Environmental Engineering (CEE). The purpose of the report is to facilitate the department

  9. QER- Comment of Berkshire Environmental Action Team

    Broader source: Energy.gov [DOE]

    Dear members of the Quadrennial Energy Review Task Force, Please find attached comments from the Berkshire Environmental Action Team, Inc. (BEAT) regarding the proposed natural gas pipeline expansion. Thank you for considering our comments.

  10. Science Maps in Action Dr. Katy Brner

    E-Print Network [OSTI]

    Menczer, Filippo

    Science Maps in Action Dr. Katy Börner Cyberinfrastructure for Network Science Center, Director Information Visualization Laboratory, Director School of Library and Information Science Indiana University Computational Scientometrics: Studying Science by Scientific Means Börner, Katy, Chen, Chaomei, and Boyack

  11. The Question of Conation in Action Theory

    E-Print Network [OSTI]

    Good, Robert

    The Question of Conation in Action Theory Robert Good Rider College In some recent and most interesting articles, Myles Brand argues that intending has an exclusively conative feature. 1 This conative feature is said by Brand to be non... of a conative component of intending is best understood in light of the recent history of Causal theories of action. Basciaily, a Causal theory is one which holds that intentional ac­ tion is caused by a preceding mental event of a partic­ ular kind...

  12. Improved lattice fermion action for heavy quarks

    E-Print Network [OSTI]

    Cho, Yong-Gwi; Jüttner, Andreas; Kaneko, Takashi; Marinkovic, Marina; Noaki, Jun-Ichi; Tsang, Justus Tobias

    2015-01-01

    We develop an improved lattice action for heavy quarks based on Brillouin-type fermions, that have excellent energy-momentum dispersion relation. The leading discretization errors of $O(a)$ and $O(a^2)$ are eliminated at tree-level. We carry out a scaling study of this improved Brillouin fermion action on quenched lattices by calculating the charmonium energy-momentum dispersion relation and hyperfine splitting. We present a comparison to standard Wilson fermions and domain-wall fermions.

  13. Improved lattice fermion action for heavy quarks

    E-Print Network [OSTI]

    Yong-Gwi Cho; Shoji Hashimoto; Andreas Jüttner; Takashi Kaneko; Marina Marinkovic; Jun-Ichi Noaki; Justus Tobias Tsang

    2015-05-28

    We develop an improved lattice action for heavy quarks based on Brillouin-type fermions, that have excellent energy-momentum dispersion relation. The leading discretization errors of $O(a)$ and $O(a^2)$ are eliminated at tree-level. We carry out a scaling study of this improved Brillouin fermion action on quenched lattices by calculating the charmonium energy-momentum dispersion relation and hyperfine splitting. We present a comparison to standard Wilson fermions and domain-wall fermions.

  14. Tonopah Test Range Summary of Corrective Action Units

    SciTech Connect (OSTI)

    Ronald B. Jackson

    2007-05-01

    Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range (TTR) may be placed into three categories: Clean Closure/No Further Action, Closure in Place, or Closure in Progress.

  15. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  16. Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX

    E-Print Network [OSTI]

    Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX SECTION 02071 - REMOVAL OF ASBESTOS CONTAINING ROOFING MATERIAL (Rev.9/00) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings Specification Sections, apply to this Section. B. Refer to Drawing C-1, "Existing Roof System Components Chart

  17. Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX

    E-Print Network [OSTI]

    Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX SECTION 02072 - REMOVAL OF INTACT INCIDENTAL ASBESTOS CONTAINING ROOFING MATERIAL (Rev.9/00) PART 1 - GENERAL 1.1 RELATED DOCUMENTS Roof System Components Chart" for location of asbestos containing roofing materials. 1.2 SUMMARY A

  18. Properties of potential eco-friendly gas replacements for particle detectors in high-energy physics

    E-Print Network [OSTI]

    Benussi, L; Piccolo, D; Saviano, G; Colafranceschi, S; Kjųlbro, J; Sharma, A; Yang, D; Chen, G; Ban, Y; Li, Q

    2015-01-01

    Modern gas detectors for detection of particles require F-based gases for optimal performance. Recent regulations demand the use of environmentally unfriendly F-based gases to be limited or banned. This review studies properties of potential eco-friendly gas candidate replacements.

  19. Properties of potential eco-friendly gas replacements for particle detectors in high-energy physics

    E-Print Network [OSTI]

    Benussi, L; Piccolo, D; Saviano, G; Colafranceschi, S; Kjųlbro, J; Yang, D; Chen, G; Ban, Y; Li, Q; Sharma, A

    2015-01-01

    Modern gas detectors for detection of particles require F-based gases for op- timal performance. Recent regulations demand the use of environmentally un- friendly Freon-based gases to be limited or banned. This review studies properties of potential eco-friendly gas candidate replacements.

  20. Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage

    E-Print Network [OSTI]

    Pedram, Massoud

    1 Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage energy generation and consumption rates are typ- ically not matched with each other. Electrical energy of the electrical energy, mitigate the supply-demand mismatch- es, and reduce the power generation capacity required

  1. Functionalized Graphene Sheets as a Versatile Replacement for Platinum in Dye-Sensitized Solar Cells

    E-Print Network [OSTI]

    Aksay, Ilhan A.

    ) this residue must not disperse in the electrolyte. KEYWORDS: graphene, dye-sensitized solar cell, cobalt redoxFunctionalized Graphene Sheets as a Versatile Replacement for Platinum in Dye-Sensitized Solar) electrodes were tested for catalytic performance in dye-sensitized solar cells (DSSCs). By using ethyl

  2. Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet data

    E-Print Network [OSTI]

    Bertini, Robert L.

    and fuel economy. Fuel price, emissions costs, and initial bus age have little impact on optimal replacement policies. However, discount rate and diesel bus price, annual utilization (in 0% FTA subsidy scenario) and fuel price (in 80% FTA subsidy scenario) have the highest impacts on per-mile costs. #12;2 1

  3. Conformationally constrained farnesoid X receptor (FXR) agonists: Heteroaryl replacements of the naphthalene

    SciTech Connect (OSTI)

    Bass, Jonathan Y.; Caravella, Justin A.; Chen, Lihong; Creech, Katrina L.; Deaton, David N.; Madauss, Kevin P.; Marr, Harry B.; McFadyen, Robert B.; Miller, Aaron B.; Mills, Wendy Y.; Navas, III, Frank; Parks, Derek J.; Smalley, Jr., Terrence L.; Spearing, Paul K.; Todd, Dan; Williams, Shawn P.; Wisely, G. Bruce

    2014-08-13

    To improve on the drug properties of GSK8062 1b, a series of heteroaryl bicyclic naphthalene replacements were prepared. The quinoline 1c was an equipotent FXR agonist with improved drug developability parameters relative to 1b. In addition, analog 1c lowered body weight gain and serum glucose in a DIO mouse model of diabetes.

  4. Review, reduce, and replace: The three `R's of energy security Larry Hughes

    E-Print Network [OSTI]

    Hughes, Larry

    ERG2007/01 Review, reduce, and replace: The three `R's of energy security Larry Hughes Energy: The three `R's of energy security 1 Abstract Rising world energy costs, increasing demand for energy contributed to national and international concerns over energy security. If a jurisdiction's energy security

  5. [Major revisionposted 12/12/13 (replaces 1/21/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 34.20 [Major revision­posted 12/12/13 (replaces 1/21/11 edition)] Operating Policy and Procedure OP 34.20: Study Abroad Programs DATE: December 12, 2013 PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to enable more students to participate in TTU study abroad programs by ensuring that those

  6. [Major revisionposted 9/15/14 (replaces 6/26/06 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 64.01 [Major revision­posted 9/15/14 (replaces 6/26/06 edition)] Operating Policy and Procedure program or certain non-degree programs, the admission is dependent upon the recommendation for admission. Students applying to degree programs should consult their prospective department since many

  7. [Major revisionposted 12/12/13 (replaces 9/2/08 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 34.26 [Major revision­posted 12/12/13 (replaces 9/2/08 edition)] Operating Policy and Procedure OP 34.26: Faculty-led Study Abroad Programs DATE: December 12, 2013 PURPOSE: The purpose programs by ensuring that those programs are: 1. Student-centered; 2. In conformity with standards

  8. [Minor revisionposted 2/12/14 (replaces 7/13/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 36.02 [Minor revision­posted 2/12/14 (replaces 7/13/11 edition)] Operating Policy and Procedure OP 36.02: Formula-eligible Professional Education Programs DATE: February 12, 2014 PURPOSE professional education programs that are submitted for state funding. REVIEW: This OP will be reviewed

  9. Optimization of opportunistic replacement activities: A case study in the aircraft industry

    E-Print Network [OSTI]

    Patriksson, Michael

    examples are power plants (e.g., water and nuclear plants), processing industry (e.g., paper plantsOptimization of opportunistic replacement activities: A case study in the aircraft industry Torgny Svensson # Abstract In the aircraft industry maximizing availability is essential. Maintenance schedules

  10. PBLRU: A SelfTuning Power Aware Storage Cache Replacement Algorithm for Conserving Disk Energy #

    E-Print Network [OSTI]

    Zhou, Yuanyuan

    PB­LRU: A Self­Tuning Power Aware Storage Cache Replacement Algorithm for Conserving Disk Energy is an important concern at data centers, where storage systems consume a significant fraction of the total energy of a data center, storage is one of the biggest energy consumers, consuming almost 27% of the total [1

  11. Measure Guideline. Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect (OSTI)

    Hunt, A.; Easley, S.

    2012-05-01

    This measure guideline evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provides a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  12. A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2

    E-Print Network [OSTI]

    Bertini, Robert L.

    A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2 3 Jesse operational3 and maintenance (O&M) per-mile costs increase as buses age. From a purely economic4 perspective, there is a cost tradeoff between the lower O&M costs of newer fleets and their5 higher initial capital costs

  13. Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after

    E-Print Network [OSTI]

    Rubel, Edwin

    Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after Targeted Ablation of Hair Cells with Diphtheria Toxin Justin S. Golub,1 Ling Tong,1 Tot B. Ngyuen,1 Cliff R. Hume,1 Richard utricle by inserting the human diphtheria toxin receptor (DTR) gene into the Pou4f3 gene, which encodes

  14. TriopusNet: Automating Wireless Sensor Network Deployment and Replacement in Pipeline Monitoring

    E-Print Network [OSTI]

    Chu, Hao-hua

    TriopusNet: Automating Wireless Sensor Network Deployment and Replacement in Pipeline Monitoring sensor net- work system for autonomous sensor deployment in pipeline monitoring. TriopusNet works by automatically releasing sensor nodes from a centralized repository located at the source of the water pipeline

  15. Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect (OSTI)

    Hunt, A.; Easley, S.

    2012-05-01

    The report evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provide a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  16. 5/8/2014 Page 1 Fill a Temporary Position to Replace an Employee on Leave

    E-Print Network [OSTI]

    Calgary, University of

    of the replacement is greater than 6 months, enter 006 ­ Tempoary Relief. Enter the Length of Term which Positioned Job ­ No Change. Enter Position Information 3. Enter the Position Number of the role you are looking to fill NOTE! If you do not know the Position Number, you can use the Look Up button and search

  17. Enforcement actions: Significant actions resolved material licensees. Semiannual progress report, July--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  18. Enforcement actions: Significant actions resolved; Quarterly progress report, October--December 1993: Volume 12, No. 4

    SciTech Connect (OSTI)

    NONE

    1994-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  19. The healthy cell bias of estrogen action: mitochondrial bioenergetics

    E-Print Network [OSTI]

    Brinton, Roberta Diaz

    The healthy cell bias of estrogen action: mitochondrial bioenergetics and neurological implications action' hypothesis examines the role that regulating mitochondrial function and bioenergetics play

  20. Energy Action Month October 2014 Campaign Materials | Department...

    Energy Savers [EERE]

    Month October 2014 Campaign Materials Energy Action Month October 2014 Campaign Materials Campaign materials for "Transition to a Clean Energy Reality," the theme for Energy Action...

  1. State Opportunities for Action: Update of States' CHP Activities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opportunities for Action: Update of States' CHP Activities (ACEEE), October 2003 State Opportunities for Action: Update of States' CHP Activities (ACEEE), October 2003 This 2003...

  2. Tonopah Test Range Environmental Restoration Corrective Action Sites

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-08-04

    This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites and Corrective Action Units at the Tonopah Test Range

  3. Water Action Plan 2 UNIVERSITY OF CALIFORNIA, IRVINE

    E-Print Network [OSTI]

    Rose, Michael R.

    UC Irvine Water Action Plan 2013 #12;2 UNIVERSITY OF CALIFORNIA, IRVINE #12;WATER ACTION PLAN TABLE...........................................11 WATER USE.......................................................................13 MAIN..........................................14 RECYCLED WATER...........................................................14 STORMWATER

  4. United States and Japan Sign Joint Nuclear Energy Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy...

  5. Energy Department Actions to Deploy Combined Heat and Power,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency October 21, 2013 -...

  6. North American Energy Ministers Take Further Action on Energy...

    Office of Environmental Management (EM)

    North American Energy Ministers Take Further Action on Energy Security and the Environment North American Energy Ministers Take Further Action on Energy Security and the...

  7. Minneapolis and Saint Paul, Minnesota: Solar in Action (Brochure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Minneapolis and Saint Paul, Minnesota: Solar in Action (Brochure), Solar...

  8. San Francisco, California: Solar in Action (Brochure), Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure), Solar America Cities,...

  9. 2012 National Energy Assurance Planning Conference After-Action...

    Energy Savers [EERE]

    2012 National Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June...

  10. Energy Literacy in Action: Nevada Teachers Helping Students Learn...

    Office of Environmental Management (EM)

    Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy November 6, 2014 -...

  11. Implementation Proposal for the National Action Plan on Demand...

    Energy Savers [EERE]

    Implementation Proposal for the National Action Plan on Demand Response - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to...

  12. Final Week of National Energy Action Month Features Technological...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Week of National Energy Action Month Features Technological Advances in Clean Energy and DOE Support of Scientific Research Final Week of National Energy Action Month Features...

  13. Implement an Institutional Change Action Plan for Sustainability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from...

  14. Develop an Institutional Change Action Plan for Sustainability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine...

  15. Overview of the State and Local Energy Efficiency Action Network

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Overview of the State and Local Energy Efficiency Action Network Johanna Zetterberg Coordinator, SEE Action Network US Department of Energy Achieving the Potential * EE remains one...

  16. Portland, Oregon: Solar in Action (Brochure), Solar America Cities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portland, Oregon: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Portland, Oregon: Solar in Action (Brochure), Solar America Cities,...

  17. San Antonio, Texas: Solar in Action (Brochure), Solar America...

    Energy Savers [EERE]

    San Antonio, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Antonio, Texas: Solar in Action (Brochure), Solar America...

  18. Consensus Action Items from CHP Roadmap Process, June 2001 |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consensus Action Items from CHP Roadmap Process, June 2001 Consensus Action Items from CHP Roadmap Process, June 2001 This paper discusses three main objectives in the CHP...

  19. Corrective Action Tracking System User's Guide | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes...

  20. Demand Response and Smart Metering Policy Actions Since the Energy...

    Office of Environmental Management (EM)

    Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Demand Response and Smart Metering Policy Actions Since the...

  1. One Year into President's Climate Action Plan, Finance Playing...

    Energy Savers [EERE]

    One Year into President's Climate Action Plan, Finance Playing an Important Role One Year into President's Climate Action Plan, Finance Playing an Important Role June 25, 2014 -...

  2. Environmental Management Los Alamos Field Office Corrective Action...

    Energy Savers [EERE]

    Field Office Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II On...

  3. Environmental Management Los Alamos Field Corrective Action Plan...

    Energy Savers [EERE]

    Los Alamos Field Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Corrective Action Plan - Radiological Release Phase II On March...

  4. National Action Plan on Demand Response, June 2010 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Regulatory Commission (FERC) is required to develop the National Action Plan on Demand Response (National Action Plan) as outlined in section 529 of the Energy...

  5. Orlando, Florida: Solar in Action (Brochure), Solar America Cities...

    Office of Environmental Management (EM)

    Orlando, Florida: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Orlando, Florida: Solar in Action (Brochure), Solar America Cities,...

  6. Denver, Colorado: Solar in Action (Brochure), Solar America Cities...

    Office of Environmental Management (EM)

    Denver, Colorado: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Denver, Colorado: Solar in Action (Brochure), Solar America Cities,...

  7. Seattle, Washington: Solar in Action (Brochure), Solar America...

    Office of Environmental Management (EM)

    Seattle, Washington: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Seattle, Washington: Solar in Action (Brochure), Solar America...

  8. Houston, Texas: Solar in Action (Brochure), Solar America Cities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Houston, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Houston, Texas: Solar in Action (Brochure), Solar America Cities,...

  9. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect (OSTI)

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  10. Promoting plumbing fixture and fitting replacement: Recommendations and review for state and local water resource authorities

    SciTech Connect (OSTI)

    Dunham, C.; Lutz, J.D.; Pickle, S.J.

    1995-06-01

    Lawrence Berkeley National Laboratory (LBNL) has prepared this report to facilitate compliance with the requirements of Section 123 of the Energy Policy Act of 1992 (EPACT). Section 123 requires the Department of Energy to issue recommendations for establishing state and local incentive programs to encourage acceleration of voluntary consumer replacement of existing water closets, urinals, showerheads and faucets with water-saving products meeting EPACT standards. The authors recommend that state and local authorities working together and also with utilities: (A) investigate the cost-effectiveness of voluntary replacement of plumbing fixtures and fittings as an effective component of a water efficiency incentive program; (B) allow utilities to distribute the costs of water saving products by billing at pre-installation rates until devices have been paid for; (C) encourage decreased water usage by establishing rate structures such as increasing block rates or seasonal pricing; (D) add additional incentive to rebate programs by making the rebates untaxable income. (E) require municipalities or utilities to exhaust every reasonable method of water conservation before applying for permits to construct water supply or water treatment systems; (F) require high-efficiency toilets, urinals, showerheads, and faucets in new construction and changing plumbing codes to incorporate different pipe sizing needs; and (G) and mandate installation of meters to correctly measure water consumption. Following the introduction, a general overview of these recommendations is presented. Each recommendation is discussed briefly. After determining the cost-effectiveness of a plumbing replacement program (or plumbing replacement aspect of a larger program) states can encourage replacement of toilets, urinals, showerheads, and faucets in a number of ways. This report lists both legislative and economic measures that can be implemented on the state level that impact local programs.

  11. Climate Action Champions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center HomeVehicle ReplacementStatesAInitiative Eventsof

  12. The Climate Change Action Plan: Technical supplement

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  13. Derivation of the action and symmetries of the q-deformed AdS_5 x S^5 superstring

    E-Print Network [OSTI]

    Francois Delduc; Marc Magro; Benoit Vicedo

    2014-09-01

    We recently proposed an integrable q-deformation of the AdS_5 x S^5 superstring action. Here we give details on the hamiltonian origin and construction of this deformation. The procedure is a generalization of the one previously developed for deforming principal chiral and symmetric space sigma-models. We also show that the original psu(2,2|4) symmetry is replaced in the deformed theory by a classical analog of the quantum group U_q(psu(2,2|4)) with q real. The relation between q and the deformation parameter entering the action is given. The framework used to derive the deformation also enables to prove that at the hamiltonian level, the "maximal deformation" limit corresponds to an undeformed semi-symmetric space sigma-model with bosonic part dS_5 x H^5. Finally, we discuss the various freedoms in the construction.

  14. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  15. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    SciTech Connect (OSTI)

    Noel Duckwtiz

    2011-05-01

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

  16. EMERGENCY ACTION University of California Riverside Main Campus Emergency Action Plan (EAP)

    E-Print Network [OSTI]

    If possible to do so without endangering yourself, shut down all operations that could produce hazards if leftEMERGENCY ACTION PLAN (EAP) University of California Riverside Main Campus Emergency Action Plan emergencies that arise within the workplace as required by the California Code of Regulations (CCR) Title 8

  17. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.

  18. Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH b. Submittals. c. Mobilization. d. Changing room trailer. e. Roofing demolition; equipment, containers & fees. f. Roofing

  19. Housekeeping category corrective action unit work plan

    SciTech Connect (OSTI)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  20. RCRA corrective action program guide (Interim)

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  1. Wilson Line Integrals in the Unparticle Action

    E-Print Network [OSTI]

    A. Lewis Licht

    2008-05-25

    We consider the unparticle action that is made gauge invariant by inclusion of an open Wilson line factor. In deriving vertexes from such an action it has been customary to use a form of differentiating the Wilson line originally proposed by Mandelstam. Using a simple example, we show that the Mandelstam derivative is mathematically inconsistent. We show that there are two ways to define differentiation of the Wilson line. The mathematically consistent method is to differentiate the explicit dependence of the line on the endpoint. The other method is a functional derivative and corresponds in a limiting case to the Mandelstam derivative. We also show that the only path that can be used in the Wilson line integral that leaves the unparticle action both Poincare and scale invariant is the straight line.

  2. Tachyon Dynamics and the Effective Action Approximation

    E-Print Network [OSTI]

    N. D. Lambert; I. Sachs

    2002-09-20

    Recently effective actions have been extensively used to describe tachyon condensation in string theory. While the various effective actions which have appeared in the literature have very similar properties for static configurations, they differ for time-dependent tachyons. In this paper we discuss general properties of non-linear effective Lagrangians which are first order in derivatives. In particular we show that some observed properties, such as asymptotically vanishing pressure, are rather generic features, although the quantative features differ. On the other hand we argue that certain features of marginal tachyon profiles are beyond the reach of any first order Lagrangian description. We also point out that an effective action, proposed earlier, captures the dynamics of tachyons well.

  3. CLIMATE ACTION PLAN 2.0 University of Pennsylvania

    E-Print Network [OSTI]

    George, Edward I.

    CLIMATE ACTION PLAN 2.0 University of Pennsylvania #12;Published October 21, 2014 #12;TABLE 28 34 38 45 CLIMATE ACTION PLAN 2.0 #12;#12;5Penn Climate Action Plan 2.0 I am pleased to present the University of Pennsylvania's Climate Action Plan 2.0, our roadmap for environmental sustainability. Drawing

  4. Scalable Action Respecting Embedding Michael Biggs and Ali Ghodsi

    E-Print Network [OSTI]

    Bowling, Michael

    starting seed. Hence, this optimization is coupled with Action-Guided Isomap for seeding. In practice first introduce an action-guided vari- ant of Isomap. Although it alone does not produce action formulation of the ARE optimization. The optimization is not convex, but the Action-Guided Isomap provides

  5. Remedial action planning for Trench 1

    SciTech Connect (OSTI)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  6. Correlation of action potentials in adjacent neurons

    E-Print Network [OSTI]

    Shneider, M N

    2015-01-01

    A possible mechanism for the synchronization of action potential propagation along a bundle of neurons (ephaptic coupling) is considered. It is shown that this mechanism is similar to the salutatory conduction of the action potential between the nodes of Ranvier in myelinated axons. The proposed model allows us to estimate the scale of the correlation, i.e., the distance between neurons in the nervous tissue, wherein their synchronization becomes possible. The possibility for experimental verification of the proposed model of synchronization is discussed.

  7. Replacing Inefficient Equipment - An Engineering Analysis to Justify Purchasing A More Efficient Chiller 

    E-Print Network [OSTI]

    Chen, H.; Deng, S.; Claridge, D. E.; Turner, W. D.; Bensouda, N.

    2005-01-01

    determinate of office building and chiller energy use, is the building schedule and office temperature that is maintained within the space. Thermostat control (day and night settings for cooling and heating within the terminal electronic controller...REPLACING INEFFICIENT EQUIPMENT --- AN ENGINEERING ANALYSIS TO JUSTIFY PURCHASING A MORE EFFICIENT CHILLER Hui Chen, P.E. Project Engineer W. D. Turner, Ph.D., P.E. Professor, Director Song Deng, P.E. Asst. Research Engineer...

  8. A PROTOTYPE FOUR INCH SHORT HYDRIDE (FISH) BED AS A REPLACEMENT TRITIUM STORAGE BED

    SciTech Connect (OSTI)

    Klein, J.; Estochen, E.; Shanahan, K.; Heung, L.

    2011-02-23

    The Savannah River Site (SRS) tritium facilities have used 1st generation (Gen1) metal hydride storage bed assemblies with process vessels (PVs) fabricated from 3 inch nominal pipe size (NPS) pipe to hold up to 12.6 kg of LaNi{sub 4.25}Al{sub 0.75} metal hydride for tritium gas absorption, storage, and desorption for over 15 years. The 2nd generation (Gen2) of the bed design used the same NPS for the PV, but the added internal components produced a bed nominally 1.2 m long, and presented a significant challenge for heater cartridge replacement in a footprint limited glove-box. A prototype 3rd generation (Gen3) metal hydride storage bed has been designed and fabricated as a replacement candidate for the Gen2 storage bed. The prototype Gen3 bed uses a PV pipe diameter of 4 inch NPS so the bed length can be reduced below 0.7 m to facilitate heater cartridge replacement. For the Gen3 prototype bed, modeling results show increased absorption rates when using hydrides with lower absorption pressures. To improve absorption performance compared to the Gen2 beds, a LaNi{sub 4.15}Al{sub 0.85} material was procured and processed to obtain the desired pressure-composition-temperature (PCT) properties. Other bed design improvements are also presented.

  9. phenix.mr_rosetta: a new tool for difficult molecular replacement problems

    SciTech Connect (OSTI)

    Terwilliger, Thomas C [Los Alamos National Laboratory; Read, Randy [UNIV OF CAMBRIDGE; De Maio, Frank [UNIV OF WASHINGTON; Baker, David [UNIV OF WASHINGTON

    2011-01-12

    The PHENIX development team is working with the Baker laboratory at the University of Washington to combine the power of Rosetta structure modeling with PHENIX automated molecular replacement (MR), model-building, density modification, and refinement. The basic idea is to find MR solutions with phenix. automr, rebuild them with Rosetta, including electron density map information, then rebuild those models with phenix. autobuild. The combination of Rosetta rebuilding and phenix rebuilding is the key part of this method. MR solutions are found with phenix. automr (Phaser), scored with LLG (optionally following Rosetta relaxation), the best solutions are picked and rebuilt with Rosetta including map information, the resulting models are scored with Rosetta, and then rescored with LLG, and the top models are rebuilt with phenix. autobuild. It can be very useful for cases where the search model used in molecular replacement is slightly too distant to rebuild successfully with phenix. autobuild. It can also be useful in cases where the model is too distant to even find a molecular replacement solution, and prerefinement with Rosetta can yield an improved search model.

  10. Technology Solutions Case Study: Replacement of Variable-Speed Motors for Furnaces

    SciTech Connect (OSTI)

    2013-02-01

    In conjunction with the New York State Energy Research and Development Authority (NYSERDA) and Proctor Engineering Group, Ltd. (PEG), the Consortium for Advanced Residential Buildings (CARB) evaluated the Concept 3™ replacement motors for residential furnaces in eight homes in Syracuse, NY. These brushless, permanent magnet (BPM) motors can use much less electricity than their PSC (permanent split capacitor) predecessors. This evaluation focuses on existing homes in the heating-dominated climate of upstate New York with the goals of characterizing field performance and cost-effectiveness. The results of this study are intended to be useful to home performance contractors, HVAC contractors, and home efficiency program stakeholders. Tests and monitoring was performed both before and after fan motors were replaced. Average fan power reductions were approximately 126 Watts during heating and 220 Watts during cooling operation. Over the course of entire heating and cooling seasons, these translated into average electric energy savings of 163 kWh, with average cost savings of $20 per year. Homes where the fan was used outside of heating and cooling mode saved an additional $42 per year on average. Results indicate that BPM replacement motors will be most cost-effective in HVAC systems with longer run times and relatively low duct static pressures. More dramatic savings are possible if occupants use the fan-only setting when there is no thermal load.

  11. Action plan for the Tiger Team assessment report

    SciTech Connect (OSTI)

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  12. Action Principle for the Generalized Harmonic Formulation of General Relativity

    E-Print Network [OSTI]

    J. David Brown

    2011-09-07

    An action principle for the generalized harmonic formulation of general relativity is presented. The action is a functional of the spacetime metric and the gauge source vector. An action principle for the Z4 formulation of general relativity has been proposed recently by Bona, Bona--Casas and Palenzuela (BBP). The relationship between the generalized harmonic action and the BBP action is discussed in detail.

  13. Quenched hadron spectroscopy with improved staggered quark action

    E-Print Network [OSTI]

    MILC Collaboration; Claude Bernard; Tom Blum; Thomas A. DeGrand; Carleton DeTar; Steven Gottlieb; Urs M. Heller; James Hetrick; Craig McNeile; K. Rummukainen; Bob Sugar; Doug Toussaint

    1997-12-11

    We investigate light hadron spectroscopy with an improved quenched staggered quark action. We compare the results obtained with an improved gauge plus an improved quark action, an improved gauge plus standard quark action, and the standard gauge plus standard quark action. Most of the improvement in the spectroscopy results is due to the improved gauge sector. However, the improved quark action substantially reduces violations of Lorentz invariance, as evidenced by the meson dispersion relations.

  14. FIRE Project Action Plan in Response to

    E-Print Network [OSTI]

    1 FIRE Project Action Plan in Response to Next Step Options Program Advisory Committee Report (PAC1) FIRE Mission: Finding F1-1: PAC-1 felt that the FIRE mission statement, "Attain, explore, understand states the scientific direction and objectives of the FIRE program, but that the mission statement does

  15. Request for Curriculum Action Curriculum Deadlines

    E-Print Network [OSTI]

    Barrash, Warren

    Request for Curriculum Action Curriculum Deadlines: November 1 Deadline for submitting changes ONLY) Undergraduate Curriculum Graduate Curriculum Department or Program Chair or Program Coordinator Signature Date Curriculum Change(s) Create new* major/program/minor/emphasis/option/certificate Create new

  16. University at Buffalo Climate Action Plan

    E-Print Network [OSTI]

    Krovi, Venkat

    ......................................................................................................... 3-26 3.5 Cumulative Reduction in UB's Carbon Footprint.......................................... 3)....................................................................... 1-5 2 UB's Greenhouse Gas Footprint..............................................2-1 2.1 Technical-9 2.4 The Impact of Campus Growth on UB's GHG Footprint.............................. 2-11 3 Actions

  17. Engineering in Action Engineering Challenge Camp

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    G-84 ESB Casey's ATA 2:30 p.m. Engineering and Racing (Race Car Presentation) ESB Parking Lot 40Engineering in Action Engineering Challenge Camp July 20-25, 2014 Hosted by the West Virginia University Benjamin M. Statler College of Engineering & Mineral Resources and sponsored in part

  18. Point de Contact National Action climatique,

    E-Print Network [OSTI]

    Bordenave, Charles

    Climate action, environment, resource efficiency and raw materials 3 081 Europe in a changing world resources and ecosystems, and a sustainable supply and use of raw materials, in order to meet the needs écosystčmes · Sustainable supply of non-energy and non-agricultural raw materials Assurer l

  19. Quantum chaos viewed from quantum action

    E-Print Network [OSTI]

    D. Huard; H. Kröger; G. Melkonyan; L. P. Nadeau; K. J. M. Moriarty

    2004-06-18

    We consider a mixed chaotic Hamiltonian system and compare classical with quantum chaos. As alternative to the methods of enegy level spacing statistics and trace formulas, we construct a quantum action and a quantum analogue phase space to analyse quantum chaos.

  20. Conversational Programming in Action Alexander Repenning

    E-Print Network [OSTI]

    Repenning, Alexander

    Conversational Programming in Action Alexander Repenning AgentSheets Inc. Boulder 80301, Colorado.0 culture, end-user programming, which is programming by end users with limited, if any, formal programming programming languages such as Logo have made programming substantially more accessible to end users. More

  1. Climate Change Action Pack Climate & Habitats

    E-Print Network [OSTI]

    Gunawardena, Arunika

    Climate Change Action Pack Climate & Habitats B A C K G R O U DN C H E C K ! Habitat, Food, Water. Disease,predation,pollution, accidents and climatic conditions are among other limiting factors which can affect an animal's ability to meet its needs. This section will look further into the impact of Climate

  2. Research Article Visual Control of Action Without

    E-Print Network [OSTI]

    Loomis, Jack M.

    almost always entails retinal flow, research on the physiology of optic-flow processing has invari- ablyResearch Article Visual Control of Action Without Retinal Optic Flow Jack M. Loomis,1 Andrew C a field of obstacles and catching a ball, entails retinal flow with motion energy (first-order motion). We

  3. Enforcement actions: Significant actions resolved. Quarterly progress report, April--June 1993: Volume 12, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  4. On Effective Action of Multiple M5-branes and ABJM Action

    E-Print Network [OSTI]

    Seiji Terashima; Futoshi Yagi

    2011-02-22

    We calculate the fluctuations from the classical multiple M5-brane solution of ABJM action which we found in the previous paper. We obtain D4-brane-like action but the gauge coupling constant depends on the spacetime coordinate. This is consistent with the expected properties of M5-brane action, although we will need to take into account the monopole operators in order to fully understand M5-branes. We also see that the Nambu-Poisson bracket is hidden in the solution.

  5. The SUN Action database : collecting and analyzing typical actions for visual scene types

    E-Print Network [OSTI]

    Olsson, Catherine Anne White

    2013-01-01

    Recent work in human and machine vision has increasingly focused on the problem of scene recognition. Scene types are largely defined by the actions one might typically do there: an office is a place someone would typically ...

  6. Chickamauga Hydro Unit 3: History of problems, application of new technology and corrective actions

    SciTech Connect (OSTI)

    Miller, L.J. III; Thompson, D.W.

    1995-12-31

    Chickamauga Unit 3 was placed in commercial operation in 1940 and has been in operation for over fifty years. During the history of the dam, concrete growth has been the source of alignment problems with all of the turbines and generators. This problem has resulted in difficulty in the maintenance of the minimum clearance between the rotating and stationary components of the unit. Disassembly of the units has been necessary to restore these minimum clearances. Over the years several potentially damaging problems have plagued this unit. In November of 1992 a Rotor Mounted Scanner (RMS) manufactured by MCM Enterprise Limited of Bellevue, Washington was installed on this unit. The use of state of the art technology has provided information which allowed operators to prevent an in-service failure when the air gap became dangerously small. Adjustments were made in the operation of the unit to minimize the temperature cycles. This change allowed the continued operation of the unit for an additional seven months to a planned outage. The turbine was scheduled to be replaced due to worn bushings in the trunion of the Kaplan type turbine. The information from the RMS was also used to formulate corrective actions that were taken during the planned outage. The findings made during the outage and corrective actions for continued dependable service will be discussed.

  7. 10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

  8. Comments on Hall transport from effective actions

    E-Print Network [OSTI]

    Felix M. Haehl; Mukund Rangamani

    2015-01-18

    We consider parity-odd transport in 2+1 dimensional charged fluids restricting attention to the class of non-dissipative fluids. We show that there is a two parameter family of such non-dissipative fluids which can be derived from an effective action, in contradistinction with a four parameter family that can be derived from an entropy current analysis. The effective action approach allows us to extract the adiabatic transport data, in particular the Hall viscosity and Hall conductivity amongst others, in terms of the thermodynamic functions that enter as 'coupling constants'. Curiously, we find that Hall viscosity is forced to vanish, whilst the Hall conductivity is generically a non-vanishing function of thermodynamic data determined in terms of the hydrodynamic couplings.

  9. 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

    SciTech Connect (OSTI)

    David E. Korns

    2012-05-01

    The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

  10. On Superconnections and the Tachyon Effective Action

    E-Print Network [OSTI]

    Alishahiha, M; Oz, Y; Alishahiha, Mohsen; Ita, Harald; Oz, Yaron

    2001-01-01

    We propose a form of the effective action of the tachyon and gauge fields for brane-antibrane systems and non-BPS Dp-branes, written in terms of the supercurvature. Kink and vortex solutions with constant infinite gauge field strength reproduce the exact tensions of the lower-dimensional D-branes. We discuss the relation to BSFT and other models in the literature.

  11. On Superconnections and the Tachyon Effective Action

    E-Print Network [OSTI]

    Mohsen Alishahiha; Harald Ita; Yaron Oz

    2000-12-22

    We propose a form of the effective action of the tachyon and gauge fields for brane-antibrane systems and non-BPS Dp-branes, written in terms of the supercurvature. Kink and vortex solutions with constant infinite gauge field strength reproduce the exact tensions of the lower-dimensional D-branes. We discuss the relation to BSFT and other models in the literature.

  12. Targeting Illegal Immigration: Local Ordinate Action 

    E-Print Network [OSTI]

    Gunn, Emily; Moffitt, Jessica; Montemayor, Victoria; Riedel, Sarah; Smith, Bart; Weizel, Daniel

    2008-01-01

    to prevent unauthorized immigration. However, from 1990 to 2005, estimates of the unauthorized alien population in the United States have risen from 3.5 million to 11.5 million people, a 325 percent increase. A small number of localities have taken action... to unauthorized aliens, while others passed legislation targeting day labor centers, loitering, and government services. Consistent with findings made in other studies,1 at the time of our study we found that only approximately 100 localities have...

  13. Topological susceptibility with the improved Asqtad action

    SciTech Connect (OSTI)

    C. Bernard et al.

    2004-01-06

    As a test of the chiral properties of the improved Asqtad (staggered fermion) action, we have been measuring the topological susceptibility as a function of quark masses for 2 + 1 dynamical flavors. We report preliminary results, which show reasonable agreement with leading order chiral perturbation theory for lattice spacing less than 0.1 fm. The total topological charge, however, shows strong persistence over Monte Carlo time.

  14. National Biofuels Action Plan, October 2008

    SciTech Connect (OSTI)

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  15. SEAB Climate Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 -Rob Roberts About UsWYOMING ROCKY MOUNTAINSEAB Climate Action

  16. Buckling of steel cylinders containing circular cutouts reinforced according to the area-replacement method

    SciTech Connect (OSTI)

    Dove, R.C.; Bennett, J.G.; Butler, T.A.

    1982-01-01

    The effect of the use of the area replacement method (ARM) for reinforcing circular penetrations in cylindrical steel shells has been studied both experimentally and analyticaly. How this type of reinforcement affects the buckling strength of a shell subjected to uniform axial compression is the specific area of investigation. In shells that are of such a quality that the penetration reduces the buckling strength, the use of the ARM will increase the bucking strength of the shell. In any case, the conservative knockdown factors suggested for buckling design by the American Society of Mechanical Engineer's (ASME) Boiler and Pressure Vessel Code should ensure an adequate margin to failure under this loading condition.

  17. Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Gordon, Kelly L.; Hafen, Ryan P.; Hathaway, John E.; McCullough, Jeffrey J.

    2012-09-01

    This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

  18. Y-12 replaces Ā¨Fort KnoxĀˇ as standard for security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLos Alamos verifies largest single andNuclearsafetyY-12replaces

  19. Study: Algae Could Replace 17% of U.S. Oil Imports | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority for anStudy: Algae Could Replace 17% of U.S. Oil

  20. DOI-BLM-OR-V040-2013-007-EA - Jonesboro Diversion Dam Replacement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Grant Right-of-Way 16 3.3.2 Impacts of Alternative 2: No Action Alternative 16 3.4 SOILS AND WATERSHED RESOURCES 17 3.4.1 Soils 17 3.4.2 Watershed Resources 17 3.4.3 Impacts...

  1. N Springs expedited response action proposal

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

  2. Action-Oriented Benchmarking: Concepts and Tools

    SciTech Connect (OSTI)

    California Energy Commission; Mathew, Paul; Mills, Evan; Mathew, Paul; Piette, Mary Ann; Bourassa, Norman; Brook, Martha

    2008-02-13

    Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article--Part 1 of a two-part series--we describe an 'action-oriented benchmarking' approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful metrics and to identify, screen and prioritize potential efficiency improvements. This opportunity assessment process can then be used to inform and optimize a full-scale audit or commissioning process. We introduce a new web-based action-oriented benchmarking system and associated software tool-EnergyIQ. The benchmarking methods, visualizations, and user interface design are informed by an end-user needs assessment survey and best-practice guidelines from ASHRAE.

  3. Sodium dichromate expedited response action assessment

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) perform an expedited response action (ERA) for the Sodium Dichromate Barrel Disposal Landfill. The ERA lead regulatory agency is Ecology and EPA is the support agency. The ERA was categorized as non-time-critical, which required preparation of an engineering evaluation and cost analysis (EE/CA). The EE/CA was included in the ERA proposal. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the Sodium Dichromate Barrel Disposal Landfill is the only waste site within the operable unit, the removal action may be the final remediation of the 100-IU-4 Operable Unit. This ERA process started in March 1992. The ERA proposal went through a parallel review process with Westinghouse Hanford Company (WHC), DOE Richland Operations (RL), EPA, Ecology, and a 30-day public comment period. Ecology and EPA issued an Action Agreement Memorandum in March 1993 (Appendix A). The memorandum directed excavation of all anomalies and disposal of the collected materials at the Hanford Site Central Landfill. Primary field activities were completed by the end of April 1993. Final waste disposal of a minor quantity of hazardous waste was completed in July 1993.

  4. Replace Pressure-Reducing Valves with Backpressure Turbogenerators (International Fact Sheet), Energy Tips-Steam, Steam Tip Sheet #20c

    SciTech Connect (OSTI)

    Not Available

    2010-10-01

    This English/Chinese ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  5. Constructs have shown success in replacement of large-diameter vessels (e.g. thoracic and abdominal aortas,

    E-Print Network [OSTI]

    Sun, Yu

    medium exchange · Develop alterna@ve so\\ware environment to simplify· Constructs have shown success in replacement of large- diameter vessels (e) constructs have shown more failure rates, resul@ng in aneurysm forma

  6. Investigation into the molar feeding ratio and temperature dependence on the replacement reaction between platinum ions and silver nanoparticles

    E-Print Network [OSTI]

    Stuk, Archimedes

    2010-01-01

    The deliberate structuring of bimetallic nanoparticles has useful applications in both fuel cell applications and biomedical research. This thesis studies the replacement reaction between platinum ions and silver nanoparticles, ...

  7. Potential commercial application of a bi-layer bone-ligament regeneration scaffold to anterior cruciate ligament replacement

    E-Print Network [OSTI]

    Li, Jessica C. (Jessica Ching-Yi)

    2006-01-01

    A business model was created in order to explore the commercial application of a bi-layer bone-ligament scaffold to the treatment of torn anterior cruciate ligaments (ACL) requiring replacement. The two main keys in producing ...

  8. ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Widener, Kevin; Bharadwaj, Nitin; Johnson, Karen

    Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

  9. ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Karen Johnson; Nitin Bharadwaj

    1990-01-01

    Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

  10. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01

    Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp Texas Water Resources Institute Texas A... and the public. This is anticipated to occur sometime in late 2003 or early 2004. TR-246 October 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final M...

  11. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect (OSTI)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  12. Reconceptualising Power in Action Research: A Focauldian Perspective 

    E-Print Network [OSTI]

    Rahman, Madhuri

    2012-11-28

    In the last decade there has been a renewed interest in the employment of Action Research within Psychology. Action Research is an orientation to inquiry, rather than a distinct method. It involves democratisation of the ...

  13. EAC Recommendations for DOE Action Regarding Non-Wires Solutions...

    Office of Environmental Management (EM)

    Non-Wires Solutions - October 17, 2012 EAC Recommendations for DOE Action Regarding Non-Wires Solutions - October 17, 2012 EAC Recommendations for DOE Action Regarding Non-Wires...

  14. Audit of Selected Hazardous Waste Remedial Actions Program Costs...

    Office of Environmental Management (EM)

    of Selected Hazardous Waste Remedial Actions Program Costs, ER-B-97-04 Audit of Selected Hazardous Waste Remedial Actions Program Costs, ER-B-97-04 Audit of Selected Hazardous...

  15. Corrective Action Tracking System (CATS) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The CATS web-based database is used to enter, track, and report the status of corrective actions developed and implemented in the DOE Corrective Action Management Program (CAMP) to...

  16. EERE Announces Next Steps on President's Climate Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan July 3, 2013 - 12:00pm Addthis Photo of President Obama...

  17. Virginia Tech Climate Action Commitment and Sustainability Plan

    E-Print Network [OSTI]

    0 Virginia Tech Climate Action Commitment and Sustainability Plan Energy & Sustainability Committee April 22, 2009 #12; 1 ACKNOWLEDGEMENTS VIRGINIA TECH CLIMATE ACTION COMMITMENT Manager, Information Technology James Torgersen Facilities Manager, Athletic Department Tom Tucker

  18. Light quark spectrum with improved gauge and fermion actions

    E-Print Network [OSTI]

    MILC Collaboration; Claude Bernard; Tom DeGrand; Carleton DeTar; Steven Gottlieb; Urs M. Heller; Jim Hetrick; Craig McNeile; Kari Rummukainen; Bob Sugar; Doug Toussaint; Matthew Wingate

    1997-11-08

    We report on a study of the light quark spectrum using an improved gauge action and both Kogut-Susskind and Naik quark actions. We have studied six different lattice spacings, corresponding to plaquette couplings ranging from 6.8 to 7.9, with five to six quark masses per coupling. We compare the two quark actions in terms of the spectrum and restoration of flavor symmetry. We also compare these results with those from the conventional action.

  19. Should a coal-fired power plant be replaced or retrofitted?

    SciTech Connect (OSTI)

    Dalia Patino-Echeverri; Benoit Morel; Jay Apt; Chao Chen

    2007-12-15

    In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO{sub 2}, NOx, Hg, and CO{sub 2} using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant; otherwise, they would install SO{sub 2} and NOx controls on the existing unit. An expectation that the CO{sub 2} price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power. 1 ref., 5 figs., 2 tabs.

  20. FIRE Action Plan to Respond to Next Step Options

    E-Print Network [OSTI]

    1 FIRE Action Plan to Respond to Next Step Options Program Advisory Committee Report #2 July 3, 2001 The FIRE Action s are listed among the NSO-PAC2 recommendations. 1. Response to NSO PAC-1 Report Representatives of the FIRE project presented an action plan for how to respond to issues that had been raised

  1. An N=1 Superfield Action for M2 branes

    E-Print Network [OSTI]

    Andrea Mauri; Anastasios C. Petkou

    2008-06-20

    We present an octonionic N=1 superfield action that reproduces in components the action of Bagger and Lambert for M2 branes. By giving an expectation value to one of the scalars we obtain the maximally supersymmetric superfield action for D2 branes.

  2. Generating Action Compilers by Partial Evaluation Anders Bondorf

    E-Print Network [OSTI]

    Palsberg, Jens

    Generating Action Compilers by Partial Evaluation Anders Bondorf DIKU, Department of Computer Compiler generation based on Mosses' action semantics has been studied by Brown, Moura, and Watt, and also by the second author. The core of each of their systems is a handwritten action compiler, producing either C

  3. Planning in Action Formalisms based on DLs: First Results

    E-Print Network [OSTI]

    Baader, Franz

    Planning in Action Formalisms based on DLs: First Results Maja Milici´c Institut fØur Theoretische started work on inte- grating action formalisms with description logics (DLs), by investigating planning in the context of DLs. We prove that the plan existence problem is decidable for actions described in fragments

  4. Electric-Magnetic Duality in QED Effective Action

    E-Print Network [OSTI]

    W. S. Bae; Y. M. Cho; D. G. Pak

    2000-11-22

    Recently we have obtained a non-perturbative but convergent series expression of the one loop effective action of QED, and discussed the renormalization of the effective action. In this paper we establish the electric-magnetic duality in the quantum effective action.

  5. Data mining for Action Recognition Andrew Gilbert Richard Bowden

    E-Print Network [OSTI]

    Bowden, Richard

    Data mining for Action Recognition Andrew Gilbert Richard Bowden Centre for Vision Speech of the features used. This paper improves the performance of action recognition through two data mining techniques, APriori association rule mining and Contrast Set Mining. These tech- niques are ideally suited to action

  6. Continuous fine-grained arm action recognition using motion spectrum

    E-Print Network [OSTI]

    Continuous fine-grained arm action recognition using motion spectrum mixture models Xi Zhao, it is necessary to recognise the fine-grained arm action during user interactions with other people or objects. A method to recognise a set of arm actions on a fine-grained level (e.g. checking the wristband, drinking

  7. Group action in topos quantum physics

    SciTech Connect (OSTI)

    Flori, C.

    2013-03-15

    Topos theory has been suggested first by Isham and Butterfield, and then by Isham and Doering, as an alternative mathematical structure within which to formulate physical theories. In particular, it has been used to reformulate standard quantum mechanics in such a way that a novel type of logic is used to represent propositions. In this paper, we extend this formulation to include the notion of a group and group transformation in such a way that we overcome the problem of twisted presheaves. In order to implement this we need to change the type of topos involved, so as to render the notion of continuity of the group action meaningful.

  8. Generalized Gravitational Entropy from Total Derivative Action

    E-Print Network [OSTI]

    Dong, Xi

    2015-01-01

    We investigate the generalized gravitational entropy from total derivative terms in the gravitational action. Following the method of Lewkowycz and Maldacena, we find that the generalized gravitational entropy from total derivatives vanishes. We compare our results with the work of Astaneh, Patrushev, and Solodukhin. We find that if total derivatives produced nonzero entropy, the holographic and the field-theoretic universal terms of entanglement entropy would not match. Furthermore, the second law of thermodynamics could be violated if the entropy of total derivatives did not vanish.

  9. NERSC.COE.key.actions-4.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shines light on77 PAGEMissionStressMoveMuncriefB ONERSCNERSC8 CoE Key Actions

  10. Climate Action Plan | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar EnergyLawler,Coal Technologies Place:Standards Jump to:CliffsClimate Action

  11. Rainforest Action Network RAN | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS Report UrlNM-b < RAPIDā€ˇ |RENERCOEnergyRadiumRailAction Network

  12. Renewable Energy Action Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS Report UrlNM-b <RefurbishedDevelopment RED 2002 Jump to:Action

  13. Climate Protection Action Fund | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (Utility Company) Jump to:NewMinnesota:Protection Action Fund (Redirected from

  14. 1 ACIT Meeting Notes ACTION ITEMS ASSIGNED TO DELIVER BY

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    a PPS replacement, has become a full business transformation for HR and payroll services. It includes for further details. Digital Commons [Rachel Deblinger] See presentation beginning on Pg. 12. Security Update

  15. Are Securities Class Actions “Supplemental” to SEC Enforcement? An Empirical Analysis

    E-Print Network [OSTI]

    Klausner, Michael

    2008-01-01

    sufficient to consider class actions supplemental. FurtherParticipants Michael Klausner Class Action Paper I havewriting on whether securities class actions can be justified

  16. Mechanical Surface Waves Accompany Action Potential Propagation

    E-Print Network [OSTI]

    Ahmed El Hady; Benjamin B. Machta

    2014-10-05

    Many studies have shown that a mechanical displacement of the axonal membrane accompanies the electrical pulse defining the Action Potential (AP). Despite a large and diverse body of experimental evidence, there is no theoretical consensus either for the physical basis of this mechanical wave nor its interdependence with the electrical signal. In this manuscript we present a model for these mechanical displacements as arising from the driving of surface wave modes in which potential energy is stored in elastic properties of the neuronal membrane and cytoskeleton while kinetic energy is carried by the axoplasmic fluid. In our model these surface waves are driven by the traveling wave of electrical depolarization that characterizes the AP, altering the compressive electrostatic forces across the membrane as it passes. This driving leads to co-propagating mechanical displacements, which we term Action Waves (AWs). Our model for these AWs allows us to predict, in terms of elastic constants, axon radius and axoplasmic density and viscosity, the shape of the AW that should accompany any traveling wave of voltage, including the AP predicted by the Hodgkin and Huxley (HH) equations. We show that our model makes predictions that are in agreement with results in experimental systems including the garfish olfactory nerve and the squid giant axon. We expect our model to serve as a framework for understanding the physical origins and possible functional roles of these AWs in neurobiology.

  17. Replacing Resistance Heating with Mini-Split Heat Pumps, Sharon, Connecticut (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-05-01

    Mini-split heat pumps can provide space heating and cooling in many climates and are relatively affordable. These and other features make them potentially suitable for retrofitting into multifamily buildings in cold climates to replace electric resistance heating or other outmoded heating systems. This report investigates the suitability of mini-split heat pumps for multifamily retrofits. Various technical and regulatory barriers are discussed and modeling was performed to compare long-term costs of substituting mini-splits for a variety of other heating and cooling options. A number of utility programs have retrofit mini-splits in both single family and multifamily residences. Two such multifamily programs are discussed in detail.

  18. Who can replace Xavi? A passing motif analysis of football players

    E-Print Network [OSTI]

    Peńa, Javier López

    2015-01-01

    Traditionally, most of football statistical and media coverage has been focused almost exclusively on goals and (ocassionally) shots. However, most of the duration of a football game is spent away from the boxes, passing the ball around. The way teams pass the ball around is the most characteristic measurement of what a team's "unique style" is. In the present work we analyse passing sequences at the player level, using the different passing frequencies as a "digital fingerprint" of a player's style. The resulting numbers provide an adequate feature set which can be used in order to construct a measure of similarity between players. Armed with such a similarity tool, one can try to answer the question: Who might possibly replace Xavi at FC Barcelona?

  19. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect (OSTI)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  20. Ligand placement based on prior structures: the guided ligand-replacement method

    SciTech Connect (OSTI)

    Klei, Herbert E. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Moriarty, Nigel W., E-mail: nwmoriarty@lbl.gov; Echols, Nathaniel [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Terwilliger, Thomas C. [Los Alamos National Laboratory, Los Alamos, NM 87545-0001 (United States); Baldwin, Eric T. [Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Natural Discovery LLC, Princeton, NJ 08542-0096 (United States); Pokross, Matt; Posy, Shana [Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Adams, Paul D. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); University of California at Berkeley, Berkeley, CA 94720-1762 (United States)

    2014-01-01

    A new module, Guided Ligand Replacement (GLR), has been developed in Phenix to increase the ease and success rate of ligand placement when prior protein-ligand complexes are available. The process of iterative structure-based drug design involves the X-ray crystal structure determination of upwards of 100 ligands with the same general scaffold (i.e. chemotype) complexed with very similar, if not identical, protein targets. In conjunction with insights from computational models and assays, this collection of crystal structures is analyzed to improve potency, to achieve better selectivity and to reduce liabilities such as absorption, distribution, metabolism, excretion and toxicology. Current methods for modeling ligands into electron-density maps typically do not utilize information on how similar ligands bound in related structures. Even if the electron density is of sufficient quality and resolution to allow de novo placement, the process can take considerable time as the size, complexity and torsional degrees of freedom of the ligands increase. A new module, Guided Ligand Replacement (GLR), was developed in Phenix to increase the ease and success rate of ligand placement when prior protein–ligand complexes are available. At the heart of GLR is an algorithm based on graph theory that associates atoms in the target ligand with analogous atoms in the reference ligand. Based on this correspondence, a set of coordinates is generated for the target ligand. GLR is especially useful in two situations: (i) modeling a series of large, flexible, complicated or macrocyclic ligands in successive structures and (ii) modeling ligands as part of a refinement pipeline that can automatically select a reference structure. Even in those cases for which no reference structure is available, if there are multiple copies of the bound ligand per asymmetric unit GLR offers an efficient way to complete the model after the first ligand has been placed. In all of these applications, GLR leverages prior knowledge from earlier structures to facilitate ligand placement in the current structure.

  1. 1 Responses to irrational actions in action observation and mentalising 2 networks of the human brain

    E-Print Network [OSTI]

    Hamilton, Antonia

    actions. Past studies in this area report mixed results, so the present paper uses new stimuli which 21- 45 prises the inferior parietal lobule (IPL), the inferior frontal gyrus (IFG) 46 and a swathe) to the superior tem- 48 poral gyrus (STG). The IFG and IPL are commonly considered to be the 49 core of the human

  2. Corrective Action Decision Document for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    U.S. Department of Energy, Nevada Operations Office

    1999-07-22

    This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative appropriate to facilitate the closure of Corrective Action Unit (CAU) 321, Weather Station Fuel Storage, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 321 is located at the Nevada Test Site (NTS) in Area 22, and consists of a single Corrective Action Site (CAS) 22-99-05, Fuel Storage Area. This CAS contains a fuel storage area approximately 325 by 540 feet, which was used to store fuel and other petroleum products necessary for motorized operations at the historical Camp Desert Rock facility, which was operational from 1951 to 1958. The corrective action investigation conducted in February 1999 found the only contaminant of concern above preliminary action levels to be total petroleum hydrocarbons as diesel-range organics at two sample locations. During this investigation, the two corrective action objectives identified were (1) to prevent or mitigate exposure to near-surface soil containing contaminants of concern, and (2) to prevent spread of contaminants of concern beyond the corrective action unit. Based on the corrective action objectives, the two corrective action alternatives developed for consideration were: Alternative 1 - No Further Action; and Alternative 2 - Clean Closure by Excavation and Disposal. The two alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors, and the preferred corrective action alternative chosen on technical merit, focusing on performance, reliability, feasibility, and safety was Alternative 2. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Weather Station Fuel Storage site.

  3. El Nino and the Delayed Action Oscillator

    E-Print Network [OSTI]

    Boutle, I; Römer, R A; Boutle, Ian; Taylor, Richard H. S.; Roemer, Rudolf A.

    2006-01-01

    We study the dynamics of the El Nino phenomenon using the mathematical model of delayed-action oscillator (DAO). Topics such as the influence of the annual cycle, global warming, stochastic influences due to weather conditions and even off-equatorial heat-sinks can all be discussed using only modest analytical and numerical resources. Thus the DAO allows for a pedagogical introduction to the science of El Nino and La Nina while at the same time avoiding the need for large-scale computing resources normally associated with much more sophisticated coupled atmosphere-ocean general circulation models. It is an approach which is ideally suited for student projects both at high school and undergraduate level.

  4. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect (OSTI)

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment;

  5. Calculation of dose rates during replacement of the 3CL seal tube in the FFTF IEM cell

    SciTech Connect (OSTI)

    Nelson, J.V.

    1997-11-12

    In September 1996, the seal tube at the 3CL window of the Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) failed. Replacement of the seal tube required removing the 3CL master slave manipulator (MSM) and shielding creating a streaming path for radiation from irradiated fuel and activated hardware in the IEM Cell. As a part of the preparation for the seal tube replacement, expected dose rates in the IEM Cell gallery outside the open 3CL penetration during the repair work were evaluated.

  6. An optimal state-age replacement policy for a semi-Markov deterioration process / by Tilden Newton Mike 

    E-Print Network [OSTI]

    Mikel, Tilden Newton

    1977-01-01

    To illustrate the solution procedures for Kao's State-Age Dependent Policy and the Optimal State-Age Replacement Policy presented in Section 4, an example is given with the following parameters: The state space E is (0, 1, 2, 3 ). The replacement costs are.... 0 1. 0 The state holding time probabilities, h(i, t), are: h(0, 0) = 0. 0, h(0, 1) = 0. 1, h(0, 2) = 0. 18, h(0, 3) = 0. 216, h(0, 4) = 0. 454, h(0, 5) = 0. 050, H(0, 5) = 1. 0, h(1, 0) = 0. 0, h(1, 1) = 0. 2, h(1, 2) = 0. 14, h(1, 3) = 0. 528...

  7. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  8. Making the Sexual Political: Women’s Transnational Collective Actions

    E-Print Network [OSTI]

    Minai, Naveen

    2010-01-01

    actions by women from Liberia, Nigeria and Kenya. I will useIn 2003, women in Liberia organized a sex boycott to protest

  9. Motivate Homeowner Action With Updated DOE Incentives Database...

    Energy Savers [EERE]

    Database Motivate Homeowner Action With Updated DOE Incentives Database Is customer motivation a barrier to marketing upgrades in your community? You can find ideas for incentives...

  10. Earned Value Management System (EVMS) Corrective Action Standard...

    Office of Environmental Management (EM)

    as a primary reference for PMOA PM-1 for development of Corrective Action Requests (CARs) and Continuous Improvement Opportunities (CIOs), as well as the assessment of...

  11. Nuclear Waste Partnership (NWP) Corrective Action Plan Addendum...

    Office of Environmental Management (EM)

    Addendum Radiological Release Event Phase II Nuclear Waste Partnership (NWP) Corrective Action Plan Addendum Radiological Release Event Phase II On Friday, February 14, 2014 there...

  12. Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck...

    Office of Environmental Management (EM)

    - Truck Fire and Radiological Release Phase I Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck Fire and Radiological Release Phase I Submittal of the Underground Salt...

  13. DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

    Energy Savers [EERE]

    Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

  14. SEE Action Series: Local Strategies for Whole-Building Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TAP Webinar eere.energy.gov The Parker Ranch installation in Hawaii DOE Technical Assistance Program SEE Action Series: Local Strategies for Whole-Building Energy Savings Molly...

  15. Insights from Smart Meters: Identifying Specific Actions, Behaviors...

    Energy Savers [EERE]

    and Characteristics That Drive Savings in Behavior-Based Programs Insights from Smart Meters: Identifying Specific Actions, Behaviors, and Characteristics That Drive...

  16. COP 18 Side Event: Advancing Collaborative Action for Low Emissions...

    Open Energy Info (EERE)

    COP 18 Side Event: Advancing Collaborative Action for Low Emissions Development Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing...

  17. Catalyzing Cooperative Action for Low Emissions Development Side...

    Open Energy Info (EERE)

    Catalyzing Cooperative Action for Low Emissions Development Side Event in Bonn Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing...

  18. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

  19. Final Week of National Energy Action Month Features Technological...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Month, senior DOE officials will participate in events from San Francisco to North Carolina to Washington. Throughout October, Secretary of Energy Ernest Moniz and...

  20. EAC Recommendations for DOE Action Regarding a Strategic Portable...

    Office of Environmental Management (EM)

    a Strategic Portable Generation Reserve - October 17, 2012 EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve - October 17, 2012 EAC...

  1. EAC Recommendations for DOE Action Regarding Development of the...

    Office of Environmental Management (EM)

    Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next...

  2. The Effective Action for QCD at High Energies

    E-Print Network [OSTI]

    Lech Szymanowski

    1994-11-16

    I discuss the construction of the effective action for QCD suitable for the description of high-energy and small momentum transfer diffractive processes.

  3. EAC Recommendations for DOE Action Regarding Implementing Effective...

    Broader source: Energy.gov (indexed) [DOE]

    Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting. EAC Recommendations for DOE Action Regarding Implementing Effective Enterprise...

  4. EAC Recommendations for DOE Action Regarding Implementing Effective...

    Broader source: Energy.gov (indexed) [DOE]

    Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting. EAC Recommendations for DOE Action Regarding Implementing Effective...

  5. Executive Order 13212 - Actions To Expedite Energy-Related Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expedite Energy-Related Projects: Federal Register Notice Volume 66, No. 99 - May 18, 2001 Executive Order 13212 - Actions To Expedite Energy-Related Projects: Federal Register...

  6. Take Action Now: Empower a Secure Energy Future

    Broader source: Energy.gov [DOE]

    Document features a Federal Energy Management Program (FEMP) template for creating a Take Action Now: Empower a Secure Energy Future campaign handout.

  7. Take Action Now: Empower a Secure Energy Future 2

    Broader source: Energy.gov [DOE]

    Document features a Federal Energy Management Program (FEMP) template for creating a Take Action Now: Empower a Secure Energy Future 2 handout.

  8. EIS-0283-S2: Amended Interim Action Determination | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0283-S2: Amended Interim Action Determination Disposition of Certain Plutonium Materials at the K-Area Complex, Savannah River Site DOE has reviewed the...

  9. Federal-Tribal Partnership on Climate Change Action Rounds Corner...

    Broader source: Energy.gov (indexed) [DOE]

    Federal-Tribal Partnership on Climate Change Action Rounds Corner, Shifts Into High Gear at 2013 Tribal Nations Conference David Conrad David Conrad Deputy Director, Office of...

  10. Climate Action Champions: Sonoma County Regional Climate Protection...

    Energy Savers [EERE]

    Sonoma County Regional Climate Protection Authority, CA Climate Action Champions: Sonoma County Regional Climate Protection Authority, CA In 2005, nine cities and the County of...

  11. Climate Action Planning: A Review of Best Practices, Key Elements...

    Open Energy Info (EERE)

    Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment...

  12. Climate Action Champions Request for Applications Informational Webinar

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Webinar will provide prospective Applicants with an overview of the Climate Actions Champions Request for Applications, the application process and respond to questions posed by attendees.

  13. CHP: A Technical & Economic Compliance Strategy - SEE Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Webinar, January 2012 This presentation, "IndustrialCommercialInstitutional Boiler MACT - Combined Heat and Power: A Technical & Economic Compliance Strategy," by John...

  14. From Racism to Affirmative Action: Will Universities Span the Gap

    E-Print Network [OSTI]

    Higginbotham, A. Leon

    1975-01-01

    implemented, subtle or blatant racism would not be one ofKEYNOTE ADDRESS "FROM RACISM TO AFFIRMATIVE ACTION: WILLif we are concerned about racism, and its consequences on

  15. On Higher Derivative Terms in Tachyon Effective Actions

    E-Print Network [OSTI]

    N. D. Lambert; I. Sachs

    2001-05-08

    We reconstruct the tachyon effective action for unstable D-branes in superstring theory by examining its behaviour near exactly marginal deformations, where the ambigous higher derivative terms can be eliminated. We then compare this action with that obtained in boundary string field theory and find remarkable agreement. In particular, the tension for lower dimensional branes and the BI-action for the centre of mass motion are reprodued exactly. We also comment on the action for tachyons on the kink in a D-brane/anti-D-brane system and on bosonic string theory.

  16. National Action Plan on Demand Response | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Working Group (FUPWG) Fall 2008 meeting-discusses the National Assessment of Demand Response study, the National Action Plan for Demand Response, and demand response as...

  17. Earned Value Management System (EVMS) Corrective Action Standard...

    Energy Savers [EERE]

    (ECASOP) Issued by Office of Project Management, Oversight, and Assessments (PMOA) PM-1 September 21, 2015 DEPARTMENT OF ENERGY EVMS CORRECTIVE ACTION SOP SEPTEMBER 21, 2015 ii...

  18. GALOIS ACTION ON KNOTS I: ACTION OF THE ABSOLUTE GALOIS GROUP

    E-Print Network [OSTI]

    Furusho, Hidekazu

    .32). The topological group FracK of profinite knots is introduced as the group of fraction of the topological monoid K in Definition 2.33. A continuous action of the profinite Grothendieck-TeichmØuller group GT [Dr2] on FracK field C. Then the group FracK of profinite knots admits a non- trivial topological GQ-module structure

  19. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    SciTech Connect (OSTI)

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

  20. Comparison of RCRA SWMU corrective action and CERCLA remedial action. Master's thesis

    SciTech Connect (OSTI)

    Rupe, S.C.

    1991-09-30

    With the passage of the Hazardous and Solid Waste Amendments of 1984 and the addition of expanded authorities to require corrective action for release of hazardous constituents from solid waste management units (SWMUs) at hazardous waste treatment, storage, and disposal facilities, the Solid Waste Disposal Act (hereafter referred to as the Resource Conservation and Recovery Act or RCRA) will dramatically influence the Superfund program under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Not only will the RCRA corrective action program help prevent current RCRA sites from becoming Superfund sites, but it also offers EPA and the states an important alternative to address superfund sites that already exist. EPA recognized this and, hoping to conserve Superfund resources, developed a policy to defer listing of sites from the National Priority List if those sites can be addressed under RCRA's corrective action authorities. Private industry and federal agencies with problem sites that could qualify under either program need to compare the advantages and disadvantages of each program. EPA's deferral policy continues to evolve and appears to be ripe for expansion.

  1. Replacement of chlorofluorocarbons at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; McCold, L.N.; Saylor, R.E.

    1997-01-01

    Three gaseous diffusion plants (GDPs) for enriching uranium maintain a large inventory of chlorofluorocarbon-114 (CFC-114) as a coolant. To address the continued use of CFC-114, an ozone-depleting substance, the US Department of Energy (DOE) considered introducing perfluorocarbons (PFCs) by the end of 1995. These PFCs would not contribute to stratospheric ozone depletion but would be larger contributors to global warming than would CFC-114. The paper reports the results of an assessment of the global impacts of four alternatives for modifying GDP coolant system operations over a three-year period beginning in 1996. The overall contribution of GDP coolant releases to impacts on ozone depletion and global warming were quantified by parameters referred to as ozone-depletion impact and global-warming impact. The analysis showed that these parameters could be used as surrogates for predicting global impacts to all resources and could provide a framework for assessing environmental impacts of a permanent coolant replacement, eliminating the need for subsequent resource-specific analyses.

  2. Concentrated solar thermal (cst) system for fuelwood replacement and for household water sanitation in developing countries.

    SciTech Connect (OSTI)

    Akinjiola, O. P.; Balachandran, U. (Energy Systems); (Rsage Research, LLC)

    2012-01-01

    Concentrated Solar Thermal (CST) is a proven renewable energy technology that harnesses solar irradiation in its most primitive form. This technology with roots in ancient history is growing at a fast pace in recent times. Developing countries could use CST to solve fundamental human-needs challenges, such as for the substitution of fuelwood and the treatment of water for household use. This paper proposes a conceptual design for a standardized modular CST for these applications in developing countries. A modular-designed parabolic CST with an aperture area of 7.5 m2 is adequate to provide enough solar thermal energy to replace the fuelwood need (5 tons/yr) or to pasteurize the minimum daily water requirement (2500 liters) for a household. Critical parameters of the CST are discussed and an affordable solid thermal storage is recommended to be used as a backup when sunlight is unavailable. A funding program that includes in-country resources and external funding will be needed to sustain the development and wide spread adaptation of this technology.

  3. Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

    SciTech Connect (OSTI)

    David Brien

    2012-06-21

    The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

  4. Building America Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  5. Technology Solutions Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts

    SciTech Connect (OSTI)

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency, which faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68°F) than day (73° F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  6. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.; Varshney, K.

    2014-09-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  7. Use of Brazilian sugarcane bagasse ash in concrete as sand replacement

    SciTech Connect (OSTI)

    Sales, Almir; Lima, Sofia Araujo

    2010-06-15

    Sugarcane today plays a major role in the worldwide economy, and Brazil is the leading producer of sugar and alcohol, which are important international commodities. The production process generates bagasse as a waste, which is used as fuel to stoke boilers that produce steam for electricity cogeneration. The final product of this burning is residual sugarcane bagasse ash (SBA), which is normally used as fertilizer in sugarcane plantations. Ash stands out among agroindustrial wastes because it results from energy generating processes. Many types of ash do not have hydraulic or pozzolanic reactivity, but can be used in civil construction as inert materials. The present study used ash collected from four sugar mills in the region of Sao Carlos, SP, Brazil, which is one of the world's largest producers of sugarcane. The ash samples were subjected to chemical characterization, sieve analysis, determination of specific gravity, X-ray diffraction, scanning electron microscopy, and solubilization and leaching tests. Mortars and concretes with SBA as sand replacement were produced and tests were carried out: compressive strength, tensile strength and elastic modulus. The results indicated that the SBA samples presented physical properties similar to those of natural sand. Several heavy metals were found in the SBA samples, indicating the need to restrict its use as a fertilizer. The mortars produced with SBA in place of sand showed better mechanical results than the reference samples. SBA can be used as a partial substitute of sand in concretes made with cement slag-modified Portland cement.

  8. Formation of Pd/Au Nanostructures from Pd Nanowires via Galvanic Replacement Reaction

    SciTech Connect (OSTI)

    Teng,X.; Wang, Q.; Liu, P.; Han, W.; Frenkel, A.; Wen, W.; Marinkovic, N.; Hanson, J.; Rodriguez, J.

    2008-01-01

    Bimetallic nanostructures with non-random metal atoms distribution are very important for various applications. To synthesize such structures via benign wet chemistry approach remains challenging. This paper reports a synthesis of a Au/Pd alloy nanostructure through the galvanic replacement reaction between Pd ultrathin nanowires (2.4 {+-} 0.2 nm in width, over 30 nm in length) and AuCl3 in toluene. Both morphological and structural changes were monitored during the reaction up to 10 h. Continuous changes of chemical composition and crystalline structure from Pd nanowires to Pd68Au32 and Pd45Au55 alloys, and to Au nanoparticles were observed. More interestingly, by using combined techniques such as high-resolution transmission electron microscopy (HRTEM), X-ray diffraction (XRD), energy dispersive X-ray spectrometry (EDS), UV-vis absorption, and extended X-ray absorption fine structure (EXAFS) spectroscopy, we found the formation of Pd68Au32 non-random alloy with Au-rich core and Pd-rich shell, and random Pd45Au55 alloy with uniformly mixed Pd and Au atom inside the nanoparticles, respectively. Density functional theory (DFT) calculations indicated that alkylamine will strongly stabilize Pd to the surface, resulting in diffusion of Au atoms into the core region to form a non-random alloy. We believe such benign synthetic techniques can also enable the large scale preparation of various types of non-random alloys for several technically important catalysis applications.

  9. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  10. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  11. Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  12. Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH-control services not specified in other sections, including the following: 1. Infrared Roof Moisture Survey 2. Alternate Roof Moisture Survey 3. Roof Drain Testing 4. Rooftop Equipment Survey/Testing 1.3 INFRARED ROOF

  13. Bridgeton Research Center Roof Replacement and Related Work December 4, 2000 DSR # 0029-99 C/D

    E-Print Network [OSTI]

    Bridgeton Research Center Roof Replacement and Related Work December 4, 2000 DSR # 0029-99 C/D SECTION 07220 ­ ROOF INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions: contains requirements for wood blocking to be installed prior to roof insulation. 1. Roof insulation

  14. On-Demand Node Reclamation and Replacement for Guaranteed Area Coverage in Long-lived Sensor Networks

    E-Print Network [OSTI]

    Zhang, Wensheng

    applica- tion in long-term tasks such as structural health monitoring for bridges and tunnels, border and efficient way to guarantee long-term energy supply has persisted as a big challenge. Recently, Tong et alOn-Demand Node Reclamation and Replacement for Guaranteed Area Coverage in Long-lived Sensor

  15. Data Protection The Data Protection Act 1984 has now been replaced by the Data Protection Act 1998,

    E-Print Network [OSTI]

    Data Protection The Data Protection Act 1984 has now been replaced by the Data Protection Act 1998, which is based on the European Data Protection Directive. The 1998 Act applies to both manual for privacy and access by individuals. Information on how to make a request for access to personal data under

  16. Re-Placing Faith: Reconsidering the Secular-Religious Use Divide in the United States and Kenya

    E-Print Network [OSTI]

    Aoki, Paul M.

    Re-Placing Faith: Reconsidering the Secular-Religious Use Divide in the United States and Kenya in urban centers in the United States and Kenya. The contributions of this work for the CHI/CSCW community countries, including key "emerging markets" such as Brazil, Nigeria and Kenya, the recent growth

  17. IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, VOL. 8, NO. 6, JUNE 2009 2819 Replacement of Spectrum Sensing in Cognitive Radio

    E-Print Network [OSTI]

    Jiang, Hai

    IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, VOL. 8, NO. 6, JUNE 2009 2819 Replacement of Spectrum IN the next generation wireless networks, the frequency spectrum will become one of the most precious resources, and is expected to become congested to accommodate the increasing demand on wireless multimedia

  18. [Minor revision--posted 10/22/12 (replaces12/22/10 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 30.05 [Minor revision--posted 10/22/12 (replaces12/22/10 edition)] Operating Policy as non-credit workshops, institutes, seminars, certificate programs, clinics, or other special training activities (hereafter referred to as non-credit programming) sponsored by Texas Tech University for which

  19. PB-LRU: A Self-Tuning Power Aware Storage Cache Replacement Algorithm for Conserving Disk Energy

    E-Print Network [OSTI]

    Zhou, Yuanyuan

    PB-LRU: A Self-Tuning Power Aware Storage Cache Replacement Algorithm for Conserving Disk Energy is an important concern at data centers, where storage systems consume a significant fraction of the total energy of a data center, storage is one of the biggest energy consumers, consuming almost 27% of the total [1

  20. Simulation Analyses in Support of DOE’s Fossil Fuel Rule for Single Component Equipment and Lighting Replacements

    SciTech Connect (OSTI)

    Halverson, Mark A.; Wang, Weimin

    2013-10-16

    At the request of DOE’s Federal Energy Management Program (FEMP), Pacific Northwest National Laboratory (PNNL) conducted a series of building energy simulations using a large office model to investigate the potential savings that could be accrued from a typical chiller, boiler, or lighting replacement in a Federal office building.

  1. The Effects of Metaphylaxis and Milk Replacer Additives on Health and Growth of Neonatal Holstein Bull Calves 

    E-Print Network [OSTI]

    Dehaan, Katherine G.

    2010-07-14

    A study evaluating the effects of metaphylaxis antibiotics and milk replacer additives on the health and development of Holstein bull calves (n=52; mean body weight=42.28 kg + 3 kg; starting age <3 days) was conducted. The calves were placed into a...

  2. The Effects of Metaphylaxis and Milk Replacer Additives on Health and Growth of Neonatal Holstein Bull Calves. 

    E-Print Network [OSTI]

    Holloway, Kenton S.

    2010-07-14

    A study evaluating effects of metaphylaxis and milk replacer additives on health and growth was conducted with Holstein bull calves (n = 52; mean BW = 42.28 +- 3 kg) < 7 d of age. Calves were randomly assigned to receive tilmicosin phosphate (TIL...

  3. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  4. Proposal to negotiate the renewal of an existing blanket purchase contract for the repair, reconditioning or replacement of klystrons for CTF3 and associated accessories

    E-Print Network [OSTI]

    2012-01-01

    Proposal to negotiate the renewal of an existing blanket purchase contract for the repair, reconditioning or replacement of klystrons for CTF3 and associated accessories

  5. Enforcement actions: Significant actions resolved individual actions. Volume 14, Nos. 3 and 4, Part 1. Semiannual progress report, July--December 1995

    SciTech Connect (OSTI)

    NONE

    1996-02-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July - December 1995) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  6. Construction of the Energy-Momentum Tensor for Wilson Actions

    E-Print Network [OSTI]

    H. Sonoda

    2015-09-02

    Given an arbitrary Wilson action of a real scalar field, we discuss how to construct the energy-momentum tensor of the theory. Using the exact renormalization group, we can determine the energy-momentum tensor implicitly, but we are short of obtaining an explicit formula in terms of the Wilson action.

  7. An action with positive kinetic energy term for general relativity

    E-Print Network [OSTI]

    T. Mei

    2007-11-02

    At first, we state some results in arXiv: 0707.2639, and then, using a positive kinetic energy coordinate condition given by arXiv: 0707.2639, we present an action with positive kinetic energy term for general relativity. Based on this action, the corresponding theory of canonical quantization is discussed.

  8. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect (OSTI)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  9. A Chronological History of Federal Fleet Actions and Mandates

    SciTech Connect (OSTI)

    2011-04-22

    This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

  10. Chronological History of Federal Fleet Actions and Mandates (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2011-04-01

    This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

  11. Implement an Institutional Change Action Plan for Sustainability

    Broader source: Energy.gov [DOE]

    Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground implementation activities must also be conducted in a manner that is suitable to the organizational context and the people in the roles being targeted.

  12. Construction of the Energy-Momentum Tensor for Wilson Actions

    E-Print Network [OSTI]

    H. Sonoda

    2015-04-11

    Given an arbitrary Wilson action of a real scalar field, we discuss how to construct the energy-momentum tensor of the theory. Using the exact renormalization group, we can determine the energy-momentum tensor implicitly, but we are short of obtaining an explicit formula in terms of the Wilson action.

  13. Genre Taxonomy: A Knowledge Repository of Communicative Actions

    E-Print Network [OSTI]

    Genre Taxonomy: A Knowledge Repository of Communicative Actions Takeshi Yoshioka1 Center taxonomy as a knowledge repository of communicative structures or "typified actions" enacted by organizational members. The Genre taxonomy aims at helping people to make sense of diverse types of communicative

  14. International Workshop on Global Roadmap and Strategic Actions

    E-Print Network [OSTI]

    Amor, Robert

    International Workshop on Global Roadmap and Strategic Actions for ICT in Construction (August 22 Support Digital Models GlobalGlobal RoadmapRoadmap Workshop Report and Summary of Key Findings Edited by on Global Roadmap and Strategic Actions for ICT in Construction | 22-24 August, 2007 | Finland - 2

  15. UNIVERSITY OF CALIFORNIA, IRVINE "GREEN" ACTIONS UNDERWAY OR COMPLETED

    E-Print Network [OSTI]

    Rose, Michael R.

    into 18 categories: 1. Research: Centers and Academic Programs 2. Green Buildings 3. Renewable Energy 4UNIVERSITY OF CALIFORNIA, IRVINE "GREEN" ACTIONS UNDERWAY OR COMPLETED "I recognize the right #12;July 2011 UC IRVINE "GREEN" ACTIONS UNDERWAY OR COMPLETED JULY 2011 This outline summarizes UC

  16. Alternatives/action plan report for outfall 17

    SciTech Connect (OSTI)

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  17. EMERGENCY ACTION DATE OF LAST REVISION: 12 July 2013

    E-Print Network [OSTI]

    Stuart, Steven J.

    EMERGENCY ACTION PLAN DATE OF LAST REVISION: 12 July 2013 #12;REVISION RECORD original issue #12;CAC-C EMERGENCY ACTION PLAN 8/6/13-4:13 PM page 3 C O N T E N T S 1.0 PURPOSE................................................................................ 4 2.0 REPORTING EMERGENCIES.................................................. 4 3.0 BUILDING

  18. Prepared for: EarthAction & the Alliance for Renewable Energy

    E-Print Network [OSTI]

    Smerdon, Jason E.

    #12;Prepared for: EarthAction & the Alliance for Renewable Energy EarthAction organizes to the People," promoting an innovative solution, Renewable Energy Payments (REPs), that gives everyone a chance to make a difference by producing, using, and selling renewable energy. The Alliance

  19. Neuromediated action of ?-casomorphins on ion transport in rabbit ileum

    E-Print Network [OSTI]

    Boyer, Edmond

    Neuromediated action of ?-casomorphins on ion transport in rabbit ileum D. TOME A. BEN MANSOUR that the action of the fl-casomorphin analog was neuromediated and suggest that this peptide acted) Correspondence: Daniel TOME. #12;modulating the release of neurotransmitters by the intrinsic nervous system

  20. SEE Action Webinar on Energy Efficiency Measure Cost Studies

    Broader source: Energy.gov [DOE]

    Presented by State and Local Energy Efficiency Action Network (SEE Action), this webinar will explain the importance of measure cost studies, review the current "state of the science" of measure cost development and estimation, and explore opportunities for future collaboration and advancement of measure cost research.

  1. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    SciTech Connect (OSTI)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  2. Stress Testing of the Philips 60W Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Poplawski, Michael E.; Ledbetter, Marc R.; Smith, Mark

    2012-04-24

    The Pacific Northwest National Laboratory, operated by Battelle for the U.S. Department of Energy, worked with Intertek to develop a procedure for stress testing medium screw-base light sources. This procedure, composed of alternating stress cycles and performance evaluation, was used to qualitatively compare and contrast the durability and reliability of the Philips 60W replacement lamp L Prize entry with market-proven compact fluorescent lamps (CFLs) with comparable light output and functionality. The stress cycles applied simultaneous combinations of electrical, thermal, vibration, and humidity stresses of increasing magnitude. Performance evaluations measured relative illuminance, x chromaticity and y chromaticity shifts after each stress cycle. The Philips L Prize entry lamps appear to be appreciably more durable than the incumbent energy-efficient technology, as represented by the evaluated CFLs, and with respect to the applied stresses. Through the course of testing, all 15 CFL samples permanently ceased to function as a result of the applied stresses, while only 1 Philips L Prize entry lamp exhibited a failure, the nature of which was minor, non-destructive, and a consequence of a known (and resolved) subcontractor issue. Given that current CFL technology appears to be moderately mature and no Philips L Prize entry failures could be produced within the stress envelope causing 100 percent failure of the benchmark CFLs, it seems that, in this particular implementation, light-emitting diode (LED) technology would be much more durable in the field than current CFL technology. However, the Philips L Prize entry lamps used for testing were carefully designed and built for the competition, while the benchmark CFLs were mass produced for retail sale—a distinction that should be taken into consideration. Further reliability testing on final production samples would be necessary to judge the extent to which the results of this analysis apply to production versions of the Philips L Prize entry.

  3. Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2013-06-25

    Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  4. Smart Buildings: Business Case and Action Plan

    SciTech Connect (OSTI)

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  5. Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Patrick Matthews

    2010-02-01

    Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.

  6. 1 EPA Actions in Response to WIPP Release EPA Actions in Response to Release of Radioactive Material

    E-Print Network [OSTI]

    1 EPA Actions in Response to WIPP Release EPA Actions in Response to Release of Radioactive Material from the Waste Isolation Pilot Plant (WIPP) Since the release of radioactive material on February 14, 2014 at the WIPP, EPA has been working closely with the New Mexico Environment Department (NMED

  7. Programmatic Environmental Report for remedial actions at UMTRA (Uranium Mill Tailings Remedial Action) Project vicinity properties

    SciTech Connect (OSTI)

    Not Available

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.

  8. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.

  9. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Alfred Wickline

    2009-04-01

    Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  10. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    SciTech Connect (OSTI)

    Kinney, Kathryn A

    2009-10-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

  11. Euler - Heisenberg effective action and magnetoelectric effect in multilayer graphene

    E-Print Network [OSTI]

    M. I. Katsnelson; G. E. Volovik; M. A. Zubkov

    2013-01-24

    The low energy effective field model for the multilayer graphene (at ABC stacking) is considered. We calculate the effective action in the presence of constant external magnetic field $B$ (normal to the graphene sheet). We also calculate the first two corrections to this effective action caused by the in-plane electric field $E$ at $E/B \\ll 1$ and discuss the magnetoelectric effect. In addition, we calculate the imaginary part of the effective action in the presence of constant electric field $E$ and the lowest order correction to it due to the magnetic field ($B/E \\ll 1$).

  12. Thermodynamics using p4-improved staggered fermion action on QCDOC

    E-Print Network [OSTI]

    Chulwoo Jung

    2005-10-05

    We present an exploratory study of the thermodynamics of $N_f=3$ QCD with an improved staggered fermions using the QCDOC supercomputer. We use a p4 action with MILC-style smeared links (Fat 7). Some details of the implementation of the p4 action on QCDOC are discussed and performance benchmarks are given. We show preliminary results for the quark mass dependence of the pseudo-critical temperature $T_c$ from several lattice volumes . We also make a comparison between p4fat7 and the old p4 action.

  13. Comparing topological charge definitions using topology fixing actions

    E-Print Network [OSTI]

    Bruckmann, Falk; Jansen, Karl; Marinkovic, Marina; Urbach, Carsten; Wagner, Marc

    2009-01-01

    We investigate both the hyperbolic action and the determinant ratio action designed to fix the topological charge on the lattice. We show to what extent topology is fixed depending on the parameters of these actions, keeping the physical situation fixed. At the same time the agreement between different definitions of topological charge - the field theoretic and the index definition - is directly correlated to the degree topology is fixed. Moreover, it turns out that the two definitions agree very well. We also study finite volume effects arising in the static potential and related quantities due to topology fixing.

  14. Comparing topological charge definitions using topology fixing actions

    E-Print Network [OSTI]

    Falk Bruckmann; Florian Gruber; Karl Jansen; Marina Marinkovic; Carsten Urbach; Marc Wagner

    2010-04-05

    We investigate both the hyperbolic action and the determinant ratio action designed to fix the topological charge on the lattice. We show to what extent topology is fixed depending on the parameters of these actions, keeping the physical situation fixed. At the same time the agreement between different definitions of topological charge - the field theoretic and the index definition - is directly correlated to the degree topology is fixed. Moreover, it turns out that the two definitions agree very well. We also study finite volume effects arising in the static potential and related quantities due to topology fixing.

  15. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  16. Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Mark Krause

    2010-08-01

    This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. • No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is recommended for the remaining 10 CASs in CAU 562. • A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.

  17. Advanced Pipe Replacement Procedure for a Defective CRDM Housing Nozzle Enables Continued Normal Operation of a Nuclear Power Plant

    SciTech Connect (OSTI)

    Gilmore, Geoff; Becker, Andrew [Climax Portable Machine Tools, Inc., 2712 East Second Street, Newberg, OR 97132 (United States)

    2006-07-01

    During the 2003 outage at the Ringhals Nuclear Plant in Sweden, a leak was found in the vicinity of a Control Rod Drive Mechanism (CRDM) housing nozzle at Unit 1. Based on the ALARA principle for radioactive contamination, a unique repair process was developed. The repair system includes utilization of custom, remotely controlled GTAW-robots, a CNC cutting and finishing machine, snake-arm robots and NDE equipment. The success of the repair solution was based on performing the machining and welding operations from the inside of the SCRAM pipe through the CRDM housing since accessibility from the outside was extremely limited. Before the actual pipe replacement procedure was performed, comprehensive training programs were conducted. Training was followed by certification of equipment, staff and procedures during qualification tests in a full scale mock-up of the housing nozzle. Due to the ingenuity of the overall repair solution and training programs, the actual pipe replacement procedure was completed in less than half the anticipated time. As a result of the successful pipe replacement, the nuclear power plant was returned to normal operation. (authors)

  18. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    D. L. Gustafason

    2001-02-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

  19. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    DOE/NV Operations Office

    1999-05-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and criteria for conducting site investigation activities at CAU 232, Area 25 Sewage Lagoons. Corrective Action Unit 232 consists of CAS 25-03-01, Sewage Lagoon, located in Area 25 of the Nevada Test Site (NTS). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Area 25 Sewage Lagoons (Figure 1-2) (IT, 1999b) are located approximately 0.3 mi south of the Test Cell 'C' (TCC) Facility and were used for the discharge of sanitary effluent from the TCC facility. For purposes of this discussion, this site will be referred to as either CAU 232 or the sewage lagoons.

  20. Corrective Action Decision Document/Closure Report for Corrective Action Unit 370: T-4 Atmospheric Test Site, Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Patrick Matthews

    2009-05-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 370, T-4 Atmospheric Test Site, located in Area 4 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 370 is comprised of Corrective Action Site (CAS) 04-23-01, Atmospheric Test Site T-4. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 370 due to the implementation of the corrective action of closure in place with administrative controls. To achieve this, corrective action investigation (CAI) activities were performed from June 25, 2008, through April 2, 2009, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 370: T-4 Atmospheric Test Site and Record of Technical Change No. 1.

  1. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    SciTech Connect (OSTI)

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action alternatives.

  2. Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Patrick Matthews

    2010-12-01

    Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for the CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The site will be investigated based on the data quality objectives (DQOs) developed on July 6, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for the Baneberry site. The primary release associated with Corrective Action Unit 365 was radiological contamination from the Baneberry nuclear test. Baneberry was an underground weapons-related test that vented significant quantities of radioactive gases from a fissure located in close proximity to ground zero. A crater formed shortly after detonation, which stemmed part of the flow from the fissure. The scope of this investigation includes surface and shallow subsurface (less than 15 feet below ground surface) soils. Radionuclides from the Baneberry test with the potential to impact groundwater are included within the Underground Test Area Subproject. Investigations and corrective actions associated with the Underground Test Area Subproject include the radiological inventory resulting from the Baneberry test.

  3. Enforcement actions: Significant actions resolved, material licensees. Semiannual progress report, July--December 1997; Volume 16, Number 2, Part 3

    SciTech Connect (OSTI)

    NONE

    1998-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July--December 1997) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  4. Enforcement actions: Significant actions resolved reactor licensees. Quarterly progress report, October--December 1994, Volume 13, No. 4, Part 1

    SciTech Connect (OSTI)

    NONE

    1995-02-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1994) and includes copies of letters Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  5. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  6. 2012 National Energy Assurance Planning Conference After-Action...

    Broader source: Energy.gov (indexed) [DOE]

    National Energy Assurance Planning Conference June 28-29, 2012 Gaylord Hotel and Convention Center, National Harbor, MD After-Action Report August 2012 Co-Sponsored by: U.S....

  7. The Dangerous Allure of the Issue Class Action

    E-Print Network [OSTI]

    Hines, Laura J.

    2004-01-01

    In the complex and chaotic world of mass torts, a class action that aggregates the claims of aggrieved individuals against a common defendant would seem not only a prudent solution, but possibly even a necessary one. The ...

  8. SEE Action Webinar on Community-Based Social Marketing

    Broader source: Energy.gov [DOE]

    Hosted by the State and Local Energy Efficiency Action Network, this webinar will describe community-based social marketing as a behavior-based approach for developing energy efficiency programs.

  9. National Action Plan Vision for 2025: A Framework for Change

    SciTech Connect (OSTI)

    National Action Plan for Energy Efficiency

    2008-11-01

    Establishes a goal of achieving all cost-effective energy efficiency by 2025 and presents 10 implementation goals as a framework for advancing the National Action Plan’s key policy recommendations.

  10. Obstacles to Determining Punitive Damages in Class Actions

    E-Print Network [OSTI]

    Hines, Laura J.

    2001-01-01

    Courts and commentators have often embraced the class action device as an ideal means of assessing punitive damages fairly in mass tort cases. In this Article, Professor Hines sounds a cautionary note by identifying a number of procedural...

  11. Challenging the Issue Class Action End-Run

    E-Print Network [OSTI]

    Hines, Laura J.

    2003-01-01

    An ever-increasing number of courts and commentators have advocated a simple solution to the seemingly insuperable problem of troublesome individual issues that often thwart certification of a Rule 23(b)(3) class action on predominance grounds...

  12. Develop an Institutional Change Action Plan for Sustainability...

    Broader source: Energy.gov (indexed) [DOE]

    showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change...

  13. Time-Dependent Utility and Action Under Uncertainty Eric Horvitz

    E-Print Network [OSTI]

    Horvitz, Eric

    Time-Dependent Utility and Action Under Uncertainty Eric Horvitz Palo Alto Laboratory Rockwell systems Doyle, 1988, Horvitz, 1988, Boddy and Dean, 1989, Russell and Wefald, 1989, Breese and Horvitz

  14. A transaction cost approach to unilateral presidential action 

    E-Print Network [OSTI]

    Marchbanks, Miner Peek, III

    2006-04-12

    Presidents have two major assets at their disposal when seeking to alter policy: executive orders and legislative action. There are certain advantages and disadvantages to each course. Although presidency scholars have focused extensively...

  15. EAC Recommendations for DOE Action Regarding the Race to the...

    Broader source: Energy.gov (indexed) [DOE]

    the Race to the Top Initiative, approved at the June 5-6, 2013 EAC Meeting. EAC Recommendations for DOE Action on the Race to the Top Initiative - June 6, 2013 More Documents &...

  16. Department of Energy Initiates Formal Enforcement Action in Los...

    Energy Savers [EERE]

    departmental enforcement actions at the Office of Enforcement. Media contact(s): Megan Barnett, DOE, (202) 586-4940 Julianne Smith, NNSA, (202) 586-7371 Addthis Related Articles...

  17. Higher Derivative Corrections to O-Plane Actions 

    E-Print Network [OSTI]

    Wang, Zhao

    2014-11-17

    Higher derivative corrections to effective actions are very important and of great interest in string theory. The aim of this dissertation is to develop a method to constrain the higher derivative corrections to O-plane ...

  18. MEDITERRANEAN ACTION PLAN MEDITERRANEAN COMMISSION FOR SUSTAINABLE DEVELOPMENT

    E-Print Network [OSTI]

    Zaferatos, Nicholas C.

    urbanisation and promoting sustainable urban development..............16 2.3. Promoting `quality' agricultureMEDITERRANEAN ACTION PLAN MEDITERRANEAN COMMISSION FOR SUSTAINABLE DEVELOPMENT MEDITERRANEAN STRATEGY FOR SUSTAINABLE DEVELOPMENT Draft (work in progress) UNEP/MAP Athens, 17 February 2005 #12

  19. Education For Empowerment and Social Action in Rural America

    E-Print Network [OSTI]

    Ostendorf, David; Levitas, Daniel

    1987-04-01

    The purpose of this paper is to describe both the underlying assumptions and results of the educationaI efforts of one grassroots, community-based organization, Prairiefire Rural Action, Inc....

  20. Develop an Institutional Change Action Plan for Sustainability

    Broader source: Energy.gov [DOE]

    After establishing a goal and assessing the rules, roles, and tools, federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals).