Powered by Deep Web Technologies
Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Microsoft Word - CX-Hatwai-DworshakSpacerReplacementFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 24, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: 2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Hatwai-Dworshak No. 1 500-kV transmission line project is located in Clearwater and Nez Perce counties, Idaho, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed Table 1:

2

Microsoft Word - CX-Hanford-Wautoma_Spacers_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: April 23, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Program Management Engineer - TELM-TPP-3 Proposed Action: Spacer replacement...

3

C:\\Temp_jhd\\spacers\\spacers_wa_2014.prn  

NLE Websites -- All DOE Office Websites (Extended Search)

Wautoma Central Ferry Monroe Lower Monumental 2014 Spacer Damper Replacement Projects * BPA Substation I Non-BPA Substation Spacer Damper Replacement Segments, 500kV BPA...

4

C:\\Temp_jhd\\spacers\\spacers_or_2014.prn  

NLE Websites -- All DOE Office Websites (Extended Search)

Slatt Pearl Wautoma Lower Monumental 2014 Spacer Damper Replacement Projects * BPA Substation I Non-BPA Substation Spacer Damper Replacement Segments, 500kV BPA...

5

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

6

Microsoft Word - CX-Slatt-John Day Spacers_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2010 4, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Slatt-John Day No. 1 500-kV transmission line Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1681 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA) Location: BPA's proposed Slatt-John Day No. 1 Transmission Line Spacer Replacement

7

Microsoft Word - CX-Schultz-Raver_3_and_4_spacers_WEBa.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corinn Castro Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Schultz - Raver No. 3 & 4 500-kV transmission lines Budget Information: Work Order #255064 PP&A Project No.: PP&A 1160 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA) Location: BPA is proposing to replace 78 miles of spacers along the Schultz - Raver No. 3 & 4 500-kV transmission lines. The proposed project is located in King and Kittitas counties,

8

Microsoft Word - CX-SpacerInsulatorRepProg1st2ndQtr2013_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2013 11, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Corinn Castro Project Manager - TEP-TPP-1 Program Manager - TPO-TPP-3 Proposed Action: 2013 Spacer and Insulator Replacement Program; First and Second Quarter Projects Budget Information: Work Order #00255064 PP&A Project No.: 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Various transmission lines located within BPA's Service Area. See Table 1 for locations of transmission lines. Description of the Proposed Action: In order to provide continued system reliability, BPA proposes to replace worn spacers and insulators along various transmission lines throughout

9

Microsoft Word - CX-SpacerInsulatorRepProg3rd4thQtr2012FY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2012 28, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: 2012 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Various transmission lines located within BPA's Service Area. See Table 1 for locations of transmission lines. Description of the Proposed Action: In order to provide continued system reliability, BPA proposes to replace worn spacers and insulators along various transmission lines throughout BPA's service area.

10

Microsoft Word - CX-SpacerInsulatorRepProgram3rd4thQtr2013_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 15, 2013 July 15, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Corinn Castro Program Manager - TPO-TPP-3 Proposed Action: 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Various transmission lines located within BPA's Service Area. See Table 1 for locations of transmission lines. Description of the Proposed Action: In order to provide continued system reliability, BPA proposes to replace worn spacers and insulators along various transmission lines throughout

11

Microsoft Word - CX-DworshakPH-Dworshak1spacers_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Dworshak PH-Dworshak No.1 500-kV transmission line Budget Information: Work Order 255064 PP&A Project No.: PP&A 1693 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA) Location: BPA's proposed Dworshak PH-Dworshak No.1 transmission line spacer

12

Microsoft Word - CX-CaptainJack-MalinSpacers_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Darrel Aaby Line Foreman III - TFRF-Redmond Proposed Action: Spacer-damper replacements on the Captain Jack-Malin 500-kV transmission line Budget Information: Work Order # 00189282 PP&A Project No.: 1856 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The proposed project is located in Klamath County, Oregon, in the Redmond Region. Proposed by: Bonneville Power Administration (BPA)

13

Building Energy Software Tools Directory: SPACER  

NLE Websites -- All DOE Office Websites (Extended Search)

SPACER SPACER SPACER image Add-on tool for the THERM computer program that provides access to a comprehensive library of different spacer configurations including the sealants and desiccants from all leading spacer manufacturers. Drawing spacer geometries is an arduous and tedious process, and often the results are inaccurate models that produce wrong simulation results. With the SPACER program this process is made uniform and consistent, leading to consistent and accurate results. It allows for easy and consistent ways to specify spacers when modeling thermal performance of fenestration systems with THERM, a leading 2-D thermal performance analysis program. The SPACER program incorporates over 2000 different spacer models from number of spacer manufacturers. Screen Shots

14

Microsoft Word - CX-Echo Lake-Monroe Spacers_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2010 17, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Spacer-damper replacements on the Echo Lake-Monroe No. 1 500-kV transmission line Budget Information: Work Order # 00255064 PP&A Project No.: 1514 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities for structures, rights-of-way, and infrastructures, (such as roads), that are required to maintain infrastructures in a condition suitable for a facility to be used for its designed purpose. Location: The project is in King and Snohomish counties, Washington in Bonneville Power Administration's (BPA) North Region, Covington and Snohomish districts. Townships,

15

Microsoft Word - CX-Rock_Creek-John_Day_No1_Spacer_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Rock Creek-John Day No. 1 500-kV transmission line; structures 1/1 to 4/2 and 6/4 to 11/2 Budget Information: Work Order #00234528 PP&A Project No.: PP&A 1167 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA)

16

Tube support grid and spacer therefor  

DOE Patents (OSTI)

A tube support grid and spacers therefor provide radially inward preloading of heat exchange tubes to minimize stress upon base welds due to differential thermal expansion. The grid comprises a concentric series of rings and spacers with opposing concave sides for conforming to the tubes and V-shaped ends to provide resilient flexibility. The flexibility aids in assembly and in transmitting seismic vibrations from the tubes to a shroud. The tube support grid may be assembled in place to achieve the desired inwardly radial preloading of the heat exchange tubes. Tab and slot assembly further minimizes stresses in the system. The radii of the grid rings may be preselected to effect the desired radially inward preloading.

Ringsmuth, Richard J. (Solano Beach, CA); Kaufman, Jay S. (Del Mar, CA)

1986-01-01T23:59:59.000Z

17

Novel electromagnetic technique for repositioning of coolant tube spacers in CANDU nuclear reactors  

Science Journals Connector (OSTI)

A novel electromagnetic technique to reposition the coolant tube spacers in the fuel channels of CANDU nuclear reactors was successfully developed in the fall of 1983 at Ontario Hydro Research Division. The need to reposition dislocated spacers in noncommissioned reactors was discovered subsequent to the rupture of a pressure tube in one reactor at the Pickering Nuclear Generator Station in Ontario. A contributing factor to the failure of the tube was the fact that the annular spacers (garter springs) used to maintain the coaxial configuration between the pressure tube and its surrounding calandria tube had been displaced longitudinally for a number of years. Subsequent to this finding it was discovered that a number of garter springs in noncommissioned nuclear reactors were displaced due to vibration induced by various sources during the construction stage. Since the garter springs are not directly accessible by mechanical means extensive dismantling of the fuel channels would have been necessary to reposition the springs in their designated locations. This paper describes a novel method to reposition the garter springs without dismantling the fuel channels. The method consists of exerting a force on the springs in the direction of the required displacement by applying a large electromagnetic impulse (generated by a 200?kJ capacitor bank) to a drive coil inserted into the pressure tube opposite the spacer. The repositioning of displaced garter springs in five new reactors in Ontario has been carried out successfully in 1984. The saving in reactor repair cost interest charges and replacement energy cost was on the order of hundreds of millions of dollars. Equally large benefits and savings will be realized if the need to use this technique in commissioned reactors arises. Also the related development of strong compact coils and low?resistance pulse power cable have significant implications and advantages in various other applications related to the pulse power industry in general and to electromagnetic metal forming and fusion technologies specifically.

Joseph H. Dableh

1986-01-01T23:59:59.000Z

18

Nuclear reactor spacer grid and ductless core component  

DOE Patents (OSTI)

The invention relates to a nuclear reactor spacer grid member for use in a liquid cooled nuclear reactor and to a ductless core component employing a plurality of these spacer grid members. The spacer grid member is of the egg-shell type and is constructed so that the walls of the cell members of the grid member are formed of a single thickness of metal to avoid tolerance problems. Within each cell member is a hydraulic spring which laterally constrains the nuclear material bearing rod which passes through each cell member against a hardstop in response to coolant flow through the cell member. This hydraulic spring is also suitable for use in a water cooled nuclear reactor. A core component constructed of, among other components, a plurality of these spacer grid members, avoids the use of a full length duct by providing spacer sleeves about the sodium tubes passing through the spacer grid members at locations between the grid members, thereby maintaining a predetermined space between adjacent grid members.

Christiansen, David W. (Kennewick, WA); Karnesky, Richard A. (Richland, WA)

1989-01-01T23:59:59.000Z

19

Development of a new feed channel spacer for reverse osmosis elements. Phase 2 final report, October 1, 1994--December 31, 1997  

SciTech Connect

During Phase 1, computer modeling techniques were used as the prime instrument of evaluation of designs for a new feed channel spacer to replace the 30 mil thick standard mesh (Vexar) spacer currently used in ROWPU [Reverse Osmosis Water Processing Unit] spiral-wound elements. A hemispherical peg model, based on a Bed of Nails concept developed in Phase 1, was selected for prototype production of spiral-wound elements for field testing. Evaluation in the See-Thru test cell to observe pressure drops through the spacer, feed mixing patterns and ease of cleaning fouled membrane samples showed considerable benefit over Vexar. This design would be suitable for production by roll embossing (or rotary punching) methods instead of expensive injection molding techniques. A 10{1/2} inch die set was fabricated to prove this concept using a 12 ton press brake. Due to a number of factors, however, the equipment did not work as anticipated and numerous modifications are currently in progress. This work will continue at no cost to the government until completed. A seawater test system has been constructed for field testing of various commercially available feed channel spacers for comparison with the Vexar spacer.

Milstead, C.E.; Riley, R.L.

1998-02-11T23:59:59.000Z

20

EA-1679: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EA-1679: Mitigation Action Plan Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington This MAP is for...

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Radiation Source Replacement Workshop  

SciTech Connect

This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

2010-12-01T23:59:59.000Z

22

E-Print Network 3.0 - ar spacer layer Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Glass Mfr System Mfr 12;Spacer Mfr Supply Drawing, Material Information Source: Massachusetts at Amherst, University of - Center for Energy Efficiency and Renewable...

23

Microsoft Word - CX-Redmond-PilotButte-Lapine_RelayCommunicationReplac...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Jim Riehl Electrical Engineer - TECC-CSB-2 Proposed Action: Replace a relaytransfer trip rack at...

24

Effect of Polyethylene Glycol, Alkyl, and Oligonucleotide Spacers on the Binding, Secondary Structure, and Self-Assembly of Fractalkine  

E-Print Network (OSTI)

Effect of Polyethylene Glycol, Alkyl, and Oligonucleotide Spacers on the Binding, Secondary-amphiphiles with no spacer (NoSPR), polyethylene glycol (PEG4, PEG8, PEG24), alkyl (C12 and C24), or oligonucleotide (T10 a polyethylene glycol (PEG) or an oligo-T (thymine) spacer is added to the aptamer, especially when attaching

Kokkoli, Efie

25

Sprinkler Head Replacement (4586), 4/24/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sprinkler Head Replacement Projects (4586) Sprinkler Head Replacement Projects (4586) Program or Field Office: Y-12 Site Office Location(s) (Citv/Countv/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: The proposed action is to replace approximately 1 ,300 sprinkler heads upgrade fire protection systems. Categorical Exclusion(s) Applied: 81.3- Routine maintenance Submit by E-mail For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D. To fit within the classes of actions listed in 10 CFR Part 1021, Subpart D, Appendix B, a proposal must be one that would not: (1) threaten

26

Retail Replacement Lamps  

Energy.gov (U.S. Department of Energy (DOE))

Annual CALiPER testing of A19, G25, candelabra, night light, MR16/PAR16, PAR20, and PAR30 replacement lamps purchased directly from store shelves offers insights on performance trends from year to year. The report findings offer valuable insights for manufacturers and retailers alike.

27

Increase of the electron mobility in HEMT heterostructures with composite spacers containing AlAs nanolayers  

SciTech Connect

The effect of the hybridization of quantum states on electron transport in a two-barrier quantum well ?-doped through a spacer layer at the limit of heavy doping is shown theoretically and experimentally. A method for increasing the electron mobility in the quantum well by suppressing the tunnel coupling with the donor region through the introduction of an AlAs nanobarrier into the spacer layer is proposed. It is experimentally shown that, in the samples with a shallow quantum well, the AlAs nanobarrier introduced into the spacer layer provides a larger than threefold increase in the electron mobility at low temperatures.

Vinichenko, A. N., E-mail: vanaxel@gmail.com; Gladkov, V. P.; Kargin, N. I.; Strikhanov, M. N.; Vasilevskii, I. S. [National Research Nuclear University MEPhI (Russian Federation)

2014-12-15T23:59:59.000Z

28

E-Print Network 3.0 - antibiotic-loaded cement spacers Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

in this study. Sealed Reference Sample Sample Cement Paste 10 mm 10 mm 11.5mm 8mm Plastic Spacers 5 mm... based on Stokes equation actually suggests that some of the...

29

Method of forming a spacer for field emission flat panel displays  

DOE Patents (OSTI)

Spacers are disclosed for applications such as field emission flat panel displays and vacuum microelectronics, and which involves the application of aerogel/xerogel technology to the formation of the spacer. In a preferred approach the method uses a mold and mold release agent wherein the gel precursor is a liquid which can be applied to the mold filling holes which expose the substrate (either the baseplate or the faceplate). A release agent is applied to the mold prior to precursor application to ease removal of the mold after formation of the dielectric spacer. The shrinkage of the gel during solvent extraction also improves mold removal. The final spacer material is a good dielectric, such as silica, secured to the substrate. 3 figs.

Bernhardt, A.F.; Contolini, R.J.

1997-08-19T23:59:59.000Z

30

Testosterone-Replacement Therapy  

Science Journals Connector (OSTI)

...took a quiz on a commercial website. On the basis of his answers to the questions on the quiz he answered "yes" to questions about decreased energy, decreased ability to play sports, and decreased sexual pleasure and erectile function the site suggested that he talk to his doctor. Martin adds... Testosterone-replacement therapy for aging men is controversial and is being debated amid heightened concern about associated cardiovascular risks. This Clinical Decisions article features expert opinions from both sides of the debate. Vote and comment at NEJM.org.

2014-11-20T23:59:59.000Z

31

Duct Chase Sprinkler Replacement Project (4594), 5/31/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Duct Chase Sprinkler Replacement Project (4594) Duct Chase Sprinkler Replacement Project (4594) Program or Field Office: Y-12 Site Office Location(s) (Citv/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: The proposed action is provide replacement of corroded and aged sprinkler heads in the plenum duct chases. Categorical Exclusion(s) Applied: 81.3- Routine maintenance Submit by E-mail For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D.

32

Cadmium plating replacements  

SciTech Connect

The Boeing Company has been searching for replacements to cadmium plate. Two alloy plating systems seem close to meeting the needs of a cadmium replacement. The two alloys, zinc-nickel and tin-zinc are from alloy plating baths; both baths are neutral pH. The alloys meet the requirements for salt fog corrosion resistance, and both alloys excel as a paint base. Currently, tests are being performed on standard fasteners to compare zinc-nickel and tin-zinc on threaded hardware where cadmium is heavily used. The Hydrogen embrittlement propensity of the zinc-nickel bath has been tested, and just beginning for the tin-zinc bath. Another area of interest is the electrical properties on aluminum for tin-zinc and will be discussed. The zinc-nickel alloy plating bath is in production in Boeing Commercial Airplane Group for non-critical low strength steels. The outlook is promising that these two coatings will help The Boeing Company significantly reduce its dependence on cadmium plating.

Nelson, M.J.; Groshart, E.C.

1995-03-01T23:59:59.000Z

33

Replace / Renewal BUDGET ZZ106  

E-Print Network (OSTI)

Replace / Renewal BUDGET ZZ106 FUND: 126 CERTIFIED FOOD MANAGER CERTIFICATE RENEWAL Certificate Replacement Reason for Application: Replacement $15.00 Certificate Renewal Reason for Application: [Renewal application may be submitted up to 60 days prior to expiration.] Renewal - $10.00 Please Note: All

34

Microsoft Word - CX-TroutdaleWindowReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Eric Weekley Project Manager - NWM-4 Proposed Action: Replace existing steel windows at the Troutdale Substation control house PP&A Project No.: PP&A-1699 Budget Information: Work Order No. 242796 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities and custodial services for buildings, structures, ... Location: Bonneville Power Administration's (BPA) Troutdale Substation located in Troutdale, Oregon Proposed by: BPA Description of the Proposed Action: BPA proposes to replace the deteriorating existing steel windows at the Troutdale Substation control house with new, in-kind steel windows.

35

Replace with Client Name  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401 INEOS New Planet BioEnergy, LLC Commercial Scale Integrated Demonstration BioEnergy Center Vero Beach, Florida Final Environmental Assessment September 2010 DOE/EA 1773 i  Table of Contents Section 1 Introduction 1.1 Overview of the Proposed Action .......................................................................... 1-1 1.2 National Environmental Policy Act ....................................................................... 1-1 1.3 Purpose and Need .................................................................................................... 1-2 1.4 Public Scoping and Agency Consultation ............................................................. 1-3

36

Milling Machine Replacement Project (4587), 5/11/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milling Machine Replacement Projects (4587) Milling Machine Replacement Projects (4587) Program or Field Office: Y-12 Site Office Location(s) (City/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: Submit by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital network communication (DNC) system. Categorical Exclusion(s) Applied: 81.31 -Installation or relocation of machinery and equipment For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation)

37

EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

78: 300 Area Steam Plant Replacement, Hanford Site, Richland, 78: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for a proposed energy conservation measure for a number of buildings in the 300 Area of the U.S. Department of Energy Hanford Site. The proposed action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a source for many of these units and constructing a central control building to operate and maintain the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 12, 1997 EA-1178: Finding of No Significant Impact

38

Dynamics of Membrane Adhesion: The Role of Polyethylene Glycol Spacers, Ligand-Receptor Bond Strength, and Rupture Pathway  

E-Print Network (OSTI)

Dynamics of Membrane Adhesion: The Role of Polyethylene Glycol Spacers, Ligand-Receptor Bond-key" binding. Poly(ethylene glycol) (PEG) has been used extensively as a synthetic flexible spacer that mimics poly(ethylene glycol) (PEG) tethers.14-17 The mechanisms of detachment of these adherent surfaces

39

Quantum Chemical Calculations of the Influence of Anchor-Cum-Spacer Groups on Femtosecond Electron  

E-Print Network (OSTI)

Quantum Chemical Calculations of the Influence of Anchor-Cum-Spacer Groups on Femtosecond Electron) cluster calculations. Approximate effective electronic coupling strengths for the heterogeneous electron-transfer interaction have been extracted from the calculated electronic structures and are used to estimate femtosecond

Goddard III, William A.

40

NACS Voice Mail Replacement Project  

E-Print Network (OSTI)

NACS Voice Mail Replacement Project Presented to the TPAG Monday, November 13, 2006 #12 criteria Integration with email is a key factor Taking a second look at Cisco & AVST Cost of Interactive

Brody, James P.

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Virent is Replacing Crude Oil  

Energy.gov (U.S. Department of Energy (DOE))

Breakout Session 2AConversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent

42

Enzyme replacement therapy for Pompe disease  

E-Print Network (OSTI)

Transport of Active Enzymes to Lysosomes. Molecular therapyOF CALIFORNIA, SAN DIEGO Enzyme Replacement Therapy forDisease 3 1.3 Enzyme Replacement Therapy for

Burris, Ryan Jonathan William

2010-01-01T23:59:59.000Z

43

Microsoft Word - CX-Coulee_Westside_Relay_Replacement_130205.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roy Slocum Project Manager - TEP-CSB-2 Proposed Action: Coulee-Westside Transfer Trip Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Locations: Grand Coulee, WA and Spokane, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista's Westside Substation and the Bureau's Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line. Under this agreement, BPA proposes to:

44

EA-1636: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

45

Turbine-generator replacement study  

SciTech Connect

This paper describes an engineering study for the replacement of a nominal 70 Mw turbine-generator in a multi-unit utility cogeneration station. The existing plant is briefly described, alternatives considered are discussed, and the conclusions reached are presented. Key topics are the turbine steam cycle evaluation and the turbine pedestal analysis.

Miller, E.F.; Stuhrke, S.P., Shah, A.A. (Burns and Roe Enterprises, Inc., Oradell, NJ (USA))

1988-01-01T23:59:59.000Z

46

Stanford University Mercury Thermometer Replacement  

E-Print Network (OSTI)

Stanford University Mercury Thermometer Replacement Program Instructions for Reuniting Separated Fluid Column of Non-Mercury Thermometer Heating Method Heat the thermometers bulb in an upright position of the thermometer. Note that over filling the expansion chamber will break the thermometer. Tap the thermometer

47

Action Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

48

Cluster-based find and replace  

Science Journals Connector (OSTI)

In current text editors, the find & replace command offers only two options: replace one match at a time prompting for confirmation, or replace all matches at once without any confirmation. Both approaches are prone to errors. This paper explores a third ... Keywords: clustering, error prevention, find & replace, text editing

Robert C. Miller; Alisa M. Marshall

2004-04-01T23:59:59.000Z

49

Buying Vs. Raising Replacement Heifers  

E-Print Network (OSTI)

. As in other businesses, when supplies are down and demand is steady, prices tend to rise. When cattle prices are high, producers begin to rebuild their herds by retaining ?high value? heifers or by purchasing replacements. The thinking is that with high... cattle prices, it is time to get into beef production or to increase cur- rent cow inventories. After the rebuilding phase occurs, supplies increase and prices drop. This is the beginning of the herd liquidation phase of the cattle cycle. Another...

Cleere, Jason

2006-01-02T23:59:59.000Z

50

Integrating local action elements for action analysis  

Science Journals Connector (OSTI)

In this paper, we propose a framework for human action analysis from video footage. A video action sequence in our perspective is a dynamic structure of sparse local spatial-temporal patches termed action elements, so the problems of action analysis ... Keywords: Action classification, Action distance function, Action matching, Action retrieval, Generalized Hough Transform, Implicit Shape Model, Multi-dimensional density estimation, Sparse Bayesian classifier, Spatial temporal feature

Tuan Hue Thi; Li Cheng; Jian Zhang; Li Wang; Shinichi Satoh

2012-03-01T23:59:59.000Z

51

Dry Pipe Sprinkler Piping Replacement Project (4588), 4/30/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pipe System Sprinkler Piping Replacement Projects (4588) Pipe System Sprinkler Piping Replacement Projects (4588) Program or Field Office: Y-12 Site Office Location(s) (City/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: Submit by E-mail The proposed action is to replace sections of dry pipe system sprinkler piping which include heads, hangers, fittings, and valves. Categorical Exclusion(s) Applied: 81.3- Routine maintenance For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part I 021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D.

52

SPACE-R nuclear power system SC-320 thermionic fuel element performance tests  

SciTech Connect

In 1993 and 1994, the Russian Scientific Research Institute NII NPO ``LUCH`` and Space Power, Inc., (SPI), of San Jose, California, developed a prototype of the single-cell thermionic fuel element (TFE) for the SPACE-R space nuclear power system (NPS). The SPACE-R system was designed as a part of the US Department of Energy`s (DOE) Space Reactor Development Program to develop a long life, space reactor system capable of supplying up to 40 kW(e) output power. The jointly developed SC-320 TFE is a prototype of the next generation thermionic converter for nuclear applications in space. This paper presents the results of the initial demonstration tests and subsequent parametric evaluations conducted on the SC-320 TFE as compared to the calculated performance characteristics. The demonstration tests were conducted jointly by Russian and American specialists at the Thermionic Evaluation Facility (TEF) at the New Mexico Engineering Research Institute (NMERI) of the University of New Mexico in Albuquerque.

Luchau, D.W.; Bruns, D.R. [Team Specialty Services, Inc., Albuquerque, NM (United States); Nikolaev, Y.V. [SIA LUCH Scientific Research Inst., Podolsk (Russian Federation)] [and others

1996-12-31T23:59:59.000Z

53

Phaser.MRage: automated molecular replacement  

Science Journals Connector (OSTI)

The functionality of the molecular-replacement pipeline phaser.MRage is introduced and illustrated with examples.

Bunk?czi, G.

2013-10-18T23:59:59.000Z

54

Computation of optimal policies in replacement models  

Science Journals Connector (OSTI)

......in a given replacement cycle, and let Zk be the value of...properties, and the replacement cycles are repeated indefini- tely...Optimal replacement times--a general set-up J. Appl. Prob. 23...Proportional hazards analysis of diesel engine failure data. Quality......

V. MAKIS; A. K. S. JARDINE

1991-01-01T23:59:59.000Z

55

Categorical Exclusion 4567, MPLE Test Stand Replacement Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.Forn1 .Forn1 Project Title: MPLE Test Stand Replacement Project (4567) Oak Ridge Tennessee This work scope is upgrade and replace equipment with a new high-pressure leak testing capability. General AdministrationlManagement DA 1 - Routine business actions DA2 - Administrative contract amendments DA4 Interpretations/rulings for existing regulations DA5 - Regulatory interpretations without environmental effect DA6 Procedural rulemakings upgrade DA7 - Transfer of property, use unchanged DA8 - Award of technical supportlM&O/personal service contracts DA9 - Info gathering, analysis, documentation, dissemination, and training DA I 0 - Reports on non-DOE legislation DAII Technical advice and planning assistance construction/operation/decommissioning DA 12 -

56

Microsoft Word - Roza_Transformer_Replacement_CX_Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Patricia Smith Project Manager KEWU-4 Proposed Action: Replace two broken transformers near the Roza Dam adult trap facility Budget Information: Work Order #188534, Task #1 Fish and Wildlife Project No.: 1997-013-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: Roza Diversion Dam Adult Trap Facility , Township 15 North, Range 19 East,

57

Environmental Assessment for the Replacement Source of Steam for A Area at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 OCTOBER 2006 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT SOURCE OF STEAM FOR A AREA AT THE SAVANNAH RIVER SITE DOE/EA-1568 ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT SOURCE OF STEAM FOR A AREA AT THE SAVANNAH RIVER SITE OCTOBER 2006 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ii TABLE OF CONTENTS Page 1.0 INTRODUCTION ...............................................................................................1 1.1 Background ..............................................................................................1 1.2 Purpose and Need for Proposed Action.....................................................1 2.0 PROPOSED ACTION AND ALTERNATIVES

58

SPACE-R nuclear power system TFE mock-up SC-320 demonstration test  

SciTech Connect

As a result of its 1993{endash}94 work, NII NPO {open_quote}{open_quote}LUCH{close_quote}{close_quote} developed a thermionic fuel element (TFE) SC-320 intended for use as part of a nuclear thermionic reactor-converter known as SPACE-R designed in the US and rated at 40 kW of output electric power. This paper presents the results of the demonstration electric power tests of the SC-320 TFE mock-up conducted in the US at the TSET testing facility located at the University of New Mexico. The data obtained are compared to the calculated characteristics as well as the output parameters of the Topaz-2 NPS TFEs. {copyright} {ital 1996 American Institute of Physics.}

Nikolaev, Y.V.; Eremin, S.A.; Kolesov, V.S.; Lapochkin, N.V.; Izhvanov, O.L.; Semin, R.N.; Androsov, V.N.; Agafonov, V.N. [Research Institute of SIA ``LUCH``, Podolsk (Russian Federation); Koester, J.K. [Space Power Incorporated, 621 River Oaks Parkway, San-Jose, California 95134 (United States)

1996-03-01T23:59:59.000Z

59

The effect of anterior proton beams in the setting of a prostate-rectum spacer  

SciTech Connect

Studies suggest that anterior beams with in vivo range verification would improve rectal dosimetry in proton therapy for prostate cancer. We investigated whether prostate-rectum spacers would enhance or diminish the benefits of anterior proton beams in these treatments. Twenty milliliters of hydrogel was injected between the prostate and rectum of a cadaver using a transperineal approach. Computed tomography (CT) and magnetic resonance (MR) images were used to generate 7 uniform scanning (US) and 7 single-field uniform dose pencil-beam scanning (PBS) plans with different beam arrangements. Pearson correlations were calculated between rectal, bladder, and femoral head dosimetric outcomes and beam arrangement anterior scores, which characterize the degree to which dose is delivered anteriorly. The overall quality of each plan was compared using a virtual dose-escalation study. For US plans, rectal mean dose was inversely correlated with anterior score, but for PBS plans there was no association between rectal mean dose and anterior score. For both US and PBS plans, full bladder and empty bladder mean doses were correlated with anterior scores. For both US and PBS plans, femoral head mean doses were inversely correlated with anterior score. For US plans and a full bladder, 4 beam arrangements that included an anterior beam tied for the highest maximum prescription dose (MPD). For US plans and an empty bladder, the arrangement with 1 anterior and 2 anterior oblique beams achieved the highest MPD in the virtual dose-escalation study. The dose-escalation study did not differentiate beam arrangements for PBS. All arrangements in the dose-escalation study were limited by bladder constraints except for the arrangement with 2 posterior oblique beams. The benefits of anterior proton beams in the setting of prostate-rectum spacers appear to be proton modality dependent and may not extend to PBS.

Christodouleas, John P., E-mail: christojo@uphs.upenn.edu [Department of Radiation Oncology, Hospital of the University of Pennsylvania, Philadelphia, PA (United States); Tang, Shikui [Department of Radiation Oncology, Hospital of the University of Pennsylvania, Philadelphia, PA (United States); Susil, Robert C.; McNutt, Todd R.; Song, Danny Y. [Department of Radiation Oncology and Radiation Molecular Sciences, Johns Hopkins Hospital, Baltimore, MD (United States); Bekelman, Justin; Deville, Curtiland; Vapiwala, Neha [Department of Radiation Oncology, Hospital of the University of Pennsylvania, Philadelphia, PA (United States); DeWeese, Theodore L. [Department of Radiation Oncology and Radiation Molecular Sciences, Johns Hopkins Hospital, Baltimore, MD (United States); Lu, Hsiao-Ming [Department of Radiation Oncology, Massachusetts General Hospital, Boston, MA (United States); Both, Stefan [Department of Radiation Oncology, Hospital of the University of Pennsylvania, Philadelphia, PA (United States)

2013-10-01T23:59:59.000Z

60

Replacing an Oversized and Underloaded Electric Motor | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacing an Oversized and Underloaded Electric Motor Replacing an Oversized and Underloaded Electric Motor This fact sheet will assist in decisions regarding replacement of...

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Non-Intrusive Experiemental Investigation of Multi-Scale Flow Behavior in Rod Bundle with Spacer-Grids  

E-Print Network (OSTI)

5 x 5 rod bundle with spacer-grids. Measurements were performed using two different grid designs. One typical of Boiling Water Reactors (BWR) with swirl type mixing vanes and the other typical of Pressurized Water Reactors (PWR) with split type...

Dominguez Ontiveros, Elvis Efren

2011-08-08T23:59:59.000Z

62

Replacing Fluorescent Lightbulbs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacing Fluorescent Lightbulbs Replacing Fluorescent Lightbulbs Replacing Fluorescent Lightbulbs July 29, 2012 - 6:37pm Addthis Although fluorescent lightbulbs are generally energy efficient, you can replace them with new, even more efficient bulbs that use better electrodes and coatings than older ones. | Photo courtesy of ©iStockphoto.com/JoLin. Although fluorescent lightbulbs are generally energy efficient, you can replace them with new, even more efficient bulbs that use better electrodes and coatings than older ones. | Photo courtesy of ©iStockphoto.com/JoLin. What does this mean for me? Today's fluorescent light fixtures and bulbs are far more efficient than older ones. You can replace fluorescent bulbs and ballasts with more efficient ones to save money and energy. All fluorescent bulbs contain a very small amount of mercury:

63

Radiological assessment of BWR recirculatory pipe replacement  

SciTech Connect

Replacement of primary recirculating coolant pipe in BWRs is a major effort that has been carried out at a number of nuclear generating stations. This report reviews the planned or actual pipe replacement projects at six sites: Nine Mile Point-1, Monticello, Cooper, Peach Bottom-2, Vermont Yankee, and Browns Ferry-1. It covers the radiological issues of the pipe replacement, measures taken to reduce doses to ALARA, estimated and actual occupational doses, and lessons learned during the various replacements. The basis for the decisions to replace the pipes, the methods used for preparation and decontamination, the removal of old pipe, and the installation of the new pipe are briefly described. Methods for reducing occupational radiation dose during pipe repairs/replacements are recommended. 32 refs., 12 figs., 17 tabs.

Parkhurst, M.A.; Hadlock, D.E.; Harty, R.; Pappin, J.L.

1986-02-01T23:59:59.000Z

64

Optimal scheduling for replacing perimeter guarding unmanned ...  

E-Print Network (OSTI)

difference between charging batteries, automatically replacing batteries [11] or refueling with liquid fuel. The main difference is the time required before the UAV

2014-08-20T23:59:59.000Z

65

LED Replacements for Linear Fluorescent Lamps Webcast  

Energy.gov (U.S. Department of Energy (DOE))

In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

66

Trim or Replace Impellers on Oversized Pumps  

Energy.gov (U.S. Department of Energy (DOE))

This tip sheet discusses the reasoning behind trimming or replacing impellers on oversized pumps and describes how it works to improve pumping system efficiency.

67

Grand Coulee Transmission Line Replacement Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

68

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPAs proposed action was to fund the project

69

Microsoft Word - CX-FY10_Bingen_UFLS_Relay_Replacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleareance Memorandum Cleareance Memorandum Cherilyn C. Randall Electrical Engineer - TPC-TPP-4 Proposed Action: Replace under frequency load shedding (UFLS) relay at Klickitat County PUD's No. 1 (KPUD) Bingen Substation PP&A Project No: 1720 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose... replace outmoded components. Location: Bingen, Washington. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an outdated and obsolete UFLS

70

Contact replacement for NMR resonance assignment  

Science Journals Connector (OSTI)

......experimental and synthetic datasets, it is robust to...edu 1 INTRODUCTION Nuclear magnetic resonance...experimental and synthetic datasets, it is robust to...edu 1 INTRODUCTION Nuclear magnetic resonance...an ensemble for a dataset, while bars indicate...replacement and nuclear vector replacement......

Fei Xiong; Gopal Pandurangan; Chris Bailey-Kellogg

2008-07-01T23:59:59.000Z

71

Immobilization of Hydroquinone through a Spacer to Polymer Grafted on Carbon Black for a High-Surface-Area Biofuel Cell Electrode  

Science Journals Connector (OSTI)

Evaluation of three different spacer arms tethering hydroquinone to linear polymers revealed that only the hydrophilic and flexible di(ethylene oxide) spacer made it possible for immobilized hydroquinone to transfer electrons from glucose oxidase (GOD) to an electrode; direct immobilization and an alkyl spacer did not. ... The carbon black used was Ketjen black (Ketjen Black International Co. Ltd, Japan) with a particle diameter of about 30 nm. ... FDH adsorbs strongly and stably on Ketjen black (KB) particles that were modified on carbon papers (CP) and produces the catalytic current with the max. ...

Takanori Tamaki; Taichi Ito; Takeo Yamaguchi

2007-08-09T23:59:59.000Z

72

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

73

Replacement solvents for use in chemical synthesis  

DOE Patents (OSTI)

Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

2001-05-15T23:59:59.000Z

74

Organic agriculture cannot replace conventional agriculture  

E-Print Network (OSTI)

Organic agriculture cannot replace conventional agriculture Sina Adl , David Iron and Theodore Agriculture | Pathogen Dispersal Introduction Organic farming [1, 2] is gaining in popularity in Eu- rope, because or- ganic agriculture avoids using environmentally harmful chem- icals that pollute soil

Kolokolnikov, Theodore

75

BALBES: a molecular-replacement pipeline  

Science Journals Connector (OSTI)

The fully automated pipeline, BALBES, integrates a redesigned hierarchical database of protein structures with their domains and multimeric organization, and solves molecular-replacement problems using only input X-ray and sequence data.

Long, F.

2007-12-04T23:59:59.000Z

76

Marin County- Wood Stove Replacement Rebate Program  

Energy.gov (U.S. Department of Energy (DOE))

The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and fireplace inserts) with cleaner burning stoves...

77

Computation of optimal policies in replacement models  

Science Journals Connector (OSTI)

......the level of metal particles in an engine oil, or a vibration monitoring...Optimal replacement times--a general set-up J. Appl. Prob. 23...Proportional hazards analysis of diesel engine failure data. Quality & Reliab......

V. MAKIS; A. K. S. JARDINE

1991-01-01T23:59:59.000Z

78

Definitive evidence of interlayer coupling between Ga{sub 1-x}Mn{sub x}As layers separated by a nonmagnetic spacer  

SciTech Connect

We have used polarized neutron reflectometry to study the structural and magnetic properties of the individual layers in a series of AlGaAs:Be/Ga{sub 1-x}Mn{sub x}As/GaAs/Ga{sub 1-x}Mn{sub x}As multilayer samples. Structurally, we observe that the samples are virtually identical except for the GaAs spacer thickness (which varies from 3 to 12 nm), and confirm that the spacers contain little or no Mn. Magnetically, we observe that for the sample with the thickest spacer layer, the Ga{sub 1-x}Mn{sub x}As layer adjacent to the Be-doped AlGaAs cap has a temperature dependent magnetization very different from that of the other Ga{sub 1-x}Mn{sub x}As layer. However, as the spacer layer thickness is reduced, the temperature dependent magnetizations of the two Ga{sub 1-x}Mn{sub x}As layers become progressively more similar--a trend we find to be independent of the crystallographic direction along which spins are magnetized. These results definitively show that Ga{sub 1-x}Mn{sub x}As layers can couple across a nonmagnetic spacer and that such coupling depends on spacer thickness.

Kirby, B. J.; Borchers, J. A.; Liu, X.; Ge, Z.; Cho, Y. J.; Dobrowolska, M.; Furdyna, J. K. [NIST Center for Neutron Research, National Institute of Standards and Technology, Gaithersburg, Maryland 20899 (United States); Department of Physics, University of Notre Dame, Notre Dame, Indiana 46556 (United States)

2007-11-15T23:59:59.000Z

79

A replaceable reflective film for solar concentrators  

SciTech Connect

The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

Not Available

1991-09-01T23:59:59.000Z

80

Climate change action plan  

E-Print Network (OSTI)

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

LED T8 Replacement Lamps | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

T8 Replacement Lamps LED T8 Replacement Lamps This documents provides an overview of LED T8 replacement lamps and helps define a reasonable minimum performance level for the...

82

REPLACING AN OVERSIZED AND UNDERLOADED ELECTRIC MOTOR  

E-Print Network (OSTI)

This fact sheet will assist in decisions regarding replacement of oversized and underloaded motors. It includes a discussion of how the MotorMaster software can be used to conduct motor replacement analyses. Motors rarely operate at their full-load point. Field tests of 60 motors at four industrial plants indicate that, on average, they operate at 60 % of their rated load. 1 Motors that drive supply or return air fans in heating, ventilation and air-conditioning (HVAC) systems generally operate at 70 % to 75 % of rated load. 2 A persistent myth is that oversized motors, especially motors operating below 50 % of rated load, are not efficient and should be immediately replaced with appropriately sized energy-efficient units. In actuality, several pieces of information are required to complete an accurate assessment of energy savings. They are the load on the motor, the operating efficiency of the motor at that load point, the full-load speed (in revolutions per minute [rpm]) of the motor to be replaced, and the full-load speed of the downsized replacement motor. 3 Motor Load Estimation Techniques Operating efficiency and motor load values must be assumed or based on field measurements and

unknown authors

83

Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel Vehicle Replacement Grants to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle Replacement Grants

84

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

replaces precious metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such...

85

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such...

86

Magnesium Replacement of Aluminum Cast Components in a Production...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Magnesium Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Magnesium Replacement of Aluminum Cast Components in a...

87

Effects of an Accelerated Diesel Engine Replacement/Retrofit Program  

E-Print Network (OSTI)

No. 894 Effects of an Accelerated Diesel Engine Replacement/2009 Effects of an Accelerated Diesel Engine Replacement/reductions occurring on an accelerated schedule compared to

Millstein, Dev E.; Harley, Robert A

2009-01-01T23:59:59.000Z

88

Microsoft Word - CX-Monroe-Snohomish-ExpandedConductorReplacement_FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 13, 2013 June 13, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Frank Weintraub Mechanical Engineer - TEP-TPP-1 Proposed Action: Replacement of expanded conductor from Bonneville Power Administration's (BPA) Monroe Substation to structure 2/1 on the Monroe-Snohomish transmission line PP&A Project No.: 2682 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions/ modifications to transmission facilities Location: Snohomish County, Washingto.n, in BPA's Snohomish District Proposed by: BPA Description of the Proposed Action: BPA proposes to replace 2.5 inch expanded conductor from Monroe Substation to structure 2/1 on the Monroe-Snohomish 230-kilovolt transmission

89

Microsoft Word - CX-UnderwoodTapStructureReplacementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-Celilo SUBJECT: Environmental Clearance Memorandum Scott Williams Line Foreman III - TFDF-The Dalles Proposed Action: Structure replacement and access road maintenance on Bonneville Power Administration's (BPA) Underwood Tap transmission line PP&A Project No.: 2683 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Skamania County, Washington Line Corridor Structures TRS County, State Underwood Tap 115-kV Line 26/12, 26/13 and 26/14 3N, 10E, Section 15 Skamania, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the

90

Microsoft Word - CX_Maupin-TyghValley_PoleReplacement_FY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2012 , 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Supervisory Civil Engineer - TEP-TPP-1 Proposed Action: Maupin-Tygh Valley #1 Pole Replacement Project Budget Information: Work Order #00297894 PP&A Project No.: 2196 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Project activities would take place in Wasco County, Oregon, T04S R14E S20 Description of the Proposed Action: BPA proposes to replace one aged and unsound wood pole structure (structure 3/2) on the BPA Maupin-Tygh Valley #1 transmission line. The new structure would be placed in the same location and have the same appearance as the old

91

Microsoft Word - CX-FY10_Ross-VanShip_Wood_Pole_Replacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Troy Dalrymple Lineman Foreman I - TFVK-LMT Proposed Action: Wood pole replacement of Ross-Vancouver Shipyard No. 1, Structure 2/3 in Fog Chamber Dump Area #2 PP&A Project No: 1721 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: Ross Complex, Vancouver, WA. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors) on

92

Microsoft Word - CX Mid Way - Grand View Wood Pole Replacement-KEP.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27, 2010 27, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF/Schultz Proposed Action: Replacing 11 wood pole structures on the Midway - Grandview transmission line and 12 wood pole structures on the Grandview - Red Mountain transmission line. PP&A Project No.: 1522 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): * B1.3 Routine maintenance activities for structures, rights-of-way, infrastructures (such as roads), are required to maintain infrastructures in a condition suitable for a facility to be used for its designed purpose. Routine maintenance may result in replacement to the extent that replacement is in kind and is not a substantial upgrade or improvement. In kind

93

The Ringhals 2 steam generator replacement  

SciTech Connect

Righals 2, located on the west coast of Sweden and operated by Vattenfall (Swedish State Power), is a Westinghouse 800-MW three-loop pressurized water reactor that started commercial operation in 1975. In 1983, a task force was assigned to make a study of the steam generator (SG) tube corrosion problems, mainly stress corrosion cracking in the tubesheet area, which caused between two and three unscheduled outages each year. The task force study concluded that replacement was clearly the best of the three alternatives considered. Late in 1984, a decision was made to replace the SG in the summer of 1989. It was also decided to take advantage of existing margins in the plant by increasing the heat transfer area of the new SG. A power increase of 9% would then be possible by fairly moderate modifications of the turbine plant. The SG replacement project was on time, below budget, and much below dose budget. As a consequence of the 9% uprating, the cost of the SG replacement will be recovered after 3 to 4 yr.

Looft, H.

1990-06-01T23:59:59.000Z

94

REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK!  

E-Print Network (OSTI)

REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK! Did you know, mercury from broken thermometers to the local environment, if broken thermometers in sinks eventually end at the sanitary sewer plant. Broken mercury thermometers create hazardous waste that is costly to clean up and costly to dispose of. Other

95

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

96

NHMFL Emergency Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

97

Superconductivity in LiFeO2Fe2Se2 with anti-PbO-type spacer layers  

Science Journals Connector (OSTI)

We report on a superconductor LiFeO2Fe2Se2 with Tc?43 K, synthesized via the hydrothermal method. The anti-PbO-type spacer layer of LiFeO2 has been successfully intercalated between the anti-PbO-type FeSe layer, which results in a high-Tc superconductivity in this iron selenide material. In this material, the LiFeO2 layer is electrically neutral and does not act as an electron donor, which is remarkably different from other heavily electron-doped intercalated FeSe-derived superconductors. Based on our results and previous reports on FeSe-based superconductors, we figure out a V-shaped anion height from the Fe layer dependence of Tc in the FeSe-derived superconductors, which is in contrast to the inverse V-shaped one for the FeAs-based superconductors. Our studies expand the categories of the iron-based superconductors and open a door in the quest for potential superconductors with various spacer layers, which is helpful for the study of the underlying physics in iron-based high-Tc superconductors.

X. F. Lu; N. Z. Wang; G. H. Zhang; X. G. Luo; Z. M. Ma; B. Lei; F. Q. Huang; X. H. Chen

2014-01-22T23:59:59.000Z

98

EIS-0350-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EIS-0350-S1: Mitigation Action Plan Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM This Mitigation Action Plan (MAP) describes mitigation and monitoring commitments for constructing and operating the Modified CMRR-NF. The commitments made in this MAP are designed to mitigate potentially adverse environmental consequences associated with the CMRR-NF Project as the CMRR-NF is constructed and operated, and as direct, indirect, and cumulative impacts from these actions occur over time. EIS-0350-S1-MAP-2011.pdf More Documents & Publications EIS-0350-S1: Final Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement

99

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

100

Corrective and Preventive Action  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Corrective/Preventive Action Process Document Number: P-008 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): P-004 Business System Management Review, F-017 Corrective Action Report Planning Worksheet or F-018 Preventive Action Report Planning Worksheet P-008 Corrective/Preventive Action Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change A Initial Release 08_0310 Implemented Multiple reviewer of "Root Cause" into process. 08_0313 Changed verbiage in Process, Responsibility and Definitions for clarification. Assigned new Backup Document Owner.

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

May 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

102

DOE/EA-1636: Finding of No Significant Impact for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project EA (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1636 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Albany- Burnt Woods and Santiam-Toledo Pole Replacement Project. This project involves replacing wood pole structures on the existing Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230-kV transmission line. BPA has prepared an environmental assessment (DOE/EA-1636) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

103

Microsoft Word - B-8.Replacement-3.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Rate Schedule Replacement-3 Availability: This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the Government and the customer from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, Cordell Hull, and Laurel Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") . Applicability: This rate schedule shall be applicable to the sale of wholesale energy purchased to

104

Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Vehicle Replacement Vouchers to someone by E-mail Share Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Facebook Tweet about Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Twitter Bookmark Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Google Bookmark Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Delicious Rank Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Digg Find More places to share Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean Vehicle Replacement Vouchers The Texas Commission on Environmental Quality administers the AirCheckTexas

105

Steam Plant Replaces Outdated Coal-Fired System | Department...  

Office of Environmental Management (EM)

Steam Plant Replaces Outdated Coal-Fired System September 1, 2012 - 12:00pm Addthis A new natural gas-fired steam plant will replace an older coal-fired steam plant shown here. The...

106

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered...  

Energy Savers (EERE)

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems May 1, 2014 - 9:33am...

107

Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps  

Energy.gov (U.S. Department of Energy (DOE))

Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

108

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment DOE/EA-1636 March 2009 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment DOE/EA-1636 Bonneville Power Administration March 2009 Bonneville Power Administration i Table of Contents Chapter 1 Need for and Purpose of Action ............................................................... 1-1 1.1 Introduction .....................................................................................................

109

Computer Replacement Guidelines Environmental Health and Safety, Stanford University  

E-Print Network (OSTI)

Computer Replacement Guidelines Environmental Health and Safety, Stanford University 17 November 2005 This document describes the guidelines for replacing laptop and desktop computers at Environmental Health and Safety. PC laptop and desktop computers will be replaced a) on an ongoing basis where

110

S&TR | March 2005: Looking at Earth in Action  

NLE Websites -- All DOE Office Websites (Extended Search)

S&TR Search S&TR Search Go March 2005 The Laboratory in the News Commentary by Stephen G. Cochran Building Networks of Trust through Collaborative Science Tracing the Steps in Nuclear Material Trafficking Looking at Earth in Action Gamma-Ray Bursts Shower the Universe with Metals Patents and Awards S&TR Staff Spacer Gif Article title: Looking at Earth in Action; photo of San Andreas Fault in California. Surface outcropping of the San Andreas Fault near Parkfield, California. EXPERIMENTAL geophysicists at Livermore are tackling diverse challenges such as the storage of nuclear wastes, discovery of new energy sources, mitigation of greenhouse effects, and better understanding of nuclear weapons. They set up experiments in the laboratory so they can examine how specific environments alter material properties. According to Brian Bonner,

111

Do You Have Windows That Need Replacing? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Do You Have Windows That Need Replacing? Do You Have Windows That Need Replacing? Do You Have Windows That Need Replacing? August 3, 2012 - 2:11pm Addthis This week, Andrea shared the first part of her two-part story about how she replaced her more than 20-year-old windows with new, energy-efficient ones. Replacing old windows can be a great way to reduce the amount of warm and cool air (depending on the season) is leaking right out of your home. This week, we're wondering: Do you have windows that need replacing, too? Do you have any plans to replace them with newer, more efficient windows? You have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles

112

Replacing Incandescent Lightbulbs and Ballasts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacing Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts July 29, 2012 - 5:16pm Addthis Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. What does this mean for me? For the greatest energy efficiency, use new fixtures with new lightbulbs. Replace A-type lightbulbs with more energy-efficient options such as CFLs, LEDs, and energy-saving (halogen) incandescents. Matching replacement lightbulbs to existing fixtures and ballasts can be tricky, especially with older fixtures. Using new fixtures made for new

113

Replaces EIA-459E OMB Control No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 (04-94) Replaces EIA-459E OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MANAGEMENT SUMMARY REPORT Page of Public reporting burden for this collection of information is estimated to average 3.38 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000 Independence Avenue, S.W., Washington, DC 20585; and to the Office of Management and Budget (OMB), Paperwork Reduction Project

114

Replaces DOE F 5120.2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

700.2 700.2 (09-93) Replaces DOE F 5120.2 (02-90) edition may be used 1. INITIATOR: NAME & SIGNATURE ORGANIZATION CODE TELEPHONE NO. 2. PROJECT TITLE: 3. RESPONSIBLE ASSISTANT SECRETARY: 4. RESPONSIBLE OPERATIONS OFFICE: 5. M&O CONTRACTOR NAME: 6. WORK AUTHORIZATION NO.: FUNDS HEREBY AUTHORIZED 7. REVISION: B&R No. $000 13. WORK AUTHORIZED: (Brief description, schedule, results or products and reporting requirements, and any shifting of funds permitted within the work authorization): U.S. DEPARTMENT OF ENERGY Management & Operating (M&O) Contract Work Authorization WORK AUTHORIZATION 14. WORK AUTHORIZATION OFFICIAL: 15. OPERATIONS OFFICE OFFICIAL: 16. M&O CONTRACTOR OFFICIAL: NAME & SIGNATURE DATE 9. PERFORMANCE PERIOD COVERED BY

115

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

116

October 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program

117

Standards Actions, July 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Program Document Status 07-01-2002 Activity Summary In Conversion - 4 In Preparation - 46 Out for Comment - 14 Published this Month - 2 5-year Review Status Revision in Progress - 11 Reaffirmation in Progress - 12 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 19 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Re- cently Sent for Coordination 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- July 2002 Standards Actions DOE Technical Standards Projects Initiated

118

Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2012 12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.6, Additions and modifications to transmission facilities. Location: Tumwater, Thurston County, WA; Ravensdale, King County, WA; Silver Creek, Lewis County, WA; Shelton, Mason County, WA; Bremerton, Kitsap County, WA; Bandon, Coos County, OR; Toledo, Lincoln County, OR; Wilsonville, Washington County, OR; Gold Beach, Curry County, OR; Stayton, Marion County, OR; Swan Valley, Bonneville County, ID; Moose, Teton County, WY (ID); Gold Creek, Powell County, MT.

119

Presence of vector mesons in the Wess-Zumino action  

Science Journals Connector (OSTI)

The Wess-Zumino action is rederived in terms of pseudoscalar fields associated with cosets of a parity-conserving subgroup of chiral symmetry instead of using the usual left-right U matrix. In this reformulation, the vector mesons can be introduced as a replacement for the "pion pair" in all of the anomaly vertices. The complete set of magnetic dipole decays for vector mesons are within the Wess-Zumino action. The numerical agreement between experimental data and predictions given by the anomaly Lagrangian is excellent for the processes ???? and ??2?.

X. Q. Zhu and D. Y. Kim

1989-10-01T23:59:59.000Z

120

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

May 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

122

Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

123

Corrective Action Program Guide  

Directives, Delegations, and Requirements

This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

2006-03-02T23:59:59.000Z

124

Microsoft Word - CX-Pearl-Marion-Tower-6-2-Replace_FY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Pearl-Marion No.1 Tower 6/2 replacement project PP&A Project No.: PP&A 2147, WO# 00296634, Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Canby, Clackamas County, Oregon Township 3 South, Range 1 East, Section 19 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace a single tower (6/2) on the existing Pearl-Marion No. 1 500-kilovolt (kV) transmission line. Tower 6/2 is located along the Molalla River where natural river channel movement and continued stream bank erosion

125

Microsoft Word - CX-NorthBonneville75-4ReplacementWenatcheeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR/Pasco KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: North Bonneville-Midway No. 1 Tower 75/4 Replacement PP&A Project No.: 2410 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: The work associated with this project will take place in the areas shown in the table below: Transmission Line/ROW Structure # Township Range Section County, State North Bonneville- Midway #1 75/4 6N 17E 14, 23 Klickitat, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace tower 75/4 on the North Bonneville-Midway No. 1 230-kilovolt (kV) transmission line to ensure the continued safe and

126

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-1 Rate Schedule More Documents & Publications Replacement-3 Wholesale Power Rate Schedule

127

300 Area steam plant replacement, Hanford Site, Richland, Washington: Environmental assessment  

SciTech Connect

Steam to support process operations and facility heating is currently produced by a centralized oil-fired plant located in the 300 Area and piped to approximately 26 facilities in the 300 Area. This plant was constructed during the 1940s and, because of tis age, is not efficient, requires a relatively large operating and maintenance staff, and is not reliable. The US Department of Energy is proposing an energy conservation measure for a number of buildings in the 300 Area of the Hanford Site. This action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a fuel source for many of these units and constructing a central control building to operate and maintain the system. A new steel-sided building would be constructed in the 300 Area in a previously disturbed area at least 400 m (one-quarter mile) from the Columbia River, or an existing 300 Area building would be modified and used. This Environmental Assessment evaluates alternatives to the proposed actions. Alternatives considered are: (1) the no action alternative; (2) use of alternative fuels, such as low-sulfur diesel oil; (3) construction of a new central steam plant, piping and ancillary systems; (4) upgrade of the existing central steam plant and ancillary systems; and (5) alternative routing of the gas distribution pipeline that is a part of the proposed action. A biological survey and culture resource review and survey were also conducted.

NONE

1997-03-01T23:59:59.000Z

128

Partial discharge pattern analysis using support vector machine to estimate size and position of metallic particle adhering to spacer in GIS  

Science Journals Connector (OSTI)

Abstract Gas insulated substations (GISs) are widely used in electrical power transmission and distribution systems. The presence of free and fixed metallic particles can initiate partial discharges (PDs) in GIS which can become a serious defect and reduce the reliability of GIS. The particle initiated PD characteristics depend on the particle size and position. Therefore, the PD characteristics can be used for the estimation of particle size and position on the spacer surface. Knowledge about the particle size and position are the important steps for the reliability improvement of the GIS equipments. This paper investigates the PD characteristics for fixed particle adhering to cylindrical shaped spacer in a simulated GIS. Length of cylindrical particles, their position on the spacer surface and gas pressure is varied to study the PD characteristics that are represented by PD fingerprints. Then these data are used for particle size and position identification. For this purpose, the use of linear support vector machine has been proposed in this paper to classify particle position and size based on the PD fingerprints data acquired at different SF6 gas pressures. It is shown that the proposed method was able to successfully estimate particles size and position at different gas pressures with an accuracy of 94%. Thus in order to improve the reliability of GIS, this approach could be considered as a potential method for particle position and size estimation in GIS.

Y. Khan; A.A. Khan; F.N. Budiman; A. Beroual; N.H. Malik; A.A. Al-Arainy

2014-01-01T23:59:59.000Z

129

Window Replacement, Rehabilitation, & Repair Guides- Building America Top Innovation  

Energy.gov (U.S. Department of Energy (DOE))

Building America team Building Science Corporation guides contractors through several options for repairing or replacing old windows to improve air sealing and thermal performance.

130

Replacement, Variable-Speed Motors for Furnaces, Syracuse, New...  

Energy Savers (EERE)

replace- ment for PSC motors in many homes. To date, CARB has upgraded six systems with Concept 3 motors. Upgrading a fan motor is usually very straightforward. Once...

131

"Green" Replacement for Industrial Applications of Polar Organic...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Advanced Materials Advanced Materials Find More Like This Return to Search "Green" Replacement for Industrial Applications of Polar Organic Solvents University of...

132

Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana  

SciTech Connect

The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

N /A

2004-08-31T23:59:59.000Z

133

May 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2009 May 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

134

February 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 2009 February 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

135

Standards Actions - April 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-28-2002 3-28-2002 Activity Summary In Conversion - 4 In Preparation - 44 Out for Comment - 13 Published this Month - 2 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Canceled 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standards Re- cently Published 2 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- April 2002 Standards Actions DOE Technical Standards Project Canceled

136

July 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

137

Action-Oriented Benchmarking:  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb-2008 submitted to Energy Engineering Feb-2008 submitted to Energy Engineering Action-Oriented Benchmarking: Concepts and Tools Evan Mills, Paul Mathew & Mary Ann Piette, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article-Part 1 of a two-part series-we describe an "action-oriented benchmarking" approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful

138

May 2010 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

139

Standards Actions, May 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-29-2002 4-29-2002 Activity Summary In Conversion - 4 In Preparation - 47 Out for Comment - 12 Published this Month - 6 5-year Review Status Revision in Progress - 10 Reaffirmation in Progress - 12 Supersedure in Progress - 0 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 20 Inside this issue: DOE Technical Standards Proposed for Reaffirmation 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- May 2002 Standards Actions DOE Technical Standards Proposed for Reaffirmation The following documents are currently being reevaluated under the 5-year

140

Standards Actions, May 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-2001 30-2001 Activity Summary In Conversion - 4 In Preparation - 39 Out for Comment - 19 Published this Month - 0 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 23 Cancellation Pending - 9 Cancellation in Progress - 18 No Current Action - 12 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Proposed for Reaffirmation 1 Proposed Cancellation of DOE Technical Standards 2 Published DOE Technical Standards 3 American National Standards Institute 3 American National Standards 6 American Society for Testing and Materials 6 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. May 2001 Standards Actions DOE Technical Standards Projects Initiated

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Locations Everyone: Lights, Camera, Action!  

Science Journals Connector (OSTI)

Locations Everyone: Lights, Camera, Action! ... Harvard Institute of Proteomics Harvard Medical School ...

Robert F. Murphy; Joshua LaBaer

2008-12-05T23:59:59.000Z

142

EIS-0472: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

143

Interactive Catalog Replaces Catalog Pages Sensing and Control  

E-Print Network (OSTI)

Interactive Catalog Replaces Catalog Pages Sensing and Control Honeywell Inc. 11 West Spring Street Freeport, Illinois 61032 Honeywell Sensing and Control has replaced the PDF product catalog with the new Series 2 Honeywell · Sensing and Control For application help: call 1-800-537-6945 BLOCK DIAGRAM MAXIMUM

Lozano-Nieto, Albert

144

LSB replacement steganography software detection based on model checking  

Science Journals Connector (OSTI)

Steganography software detection is one of effective approaches for steganography forensics using software analysis. In this paper a method of LSB replacement steganography software detection is proposed. Firstly three typical implementations of LSB ... Keywords: LSB replacement algorithm, automaton, model checking, steganography software

Zheng Zhao; Fenlin Liu; Xiangyang Luo; Xin Xie; Lu Yu

2012-10-01T23:59:59.000Z

145

May 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Revisions 1 DOE Technical Standards Projects Initiated 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 04-27-2005 Activity Summary In Conversion - 4 In Preparation - 25

146

POSITION MANAGEMENT ACTION FORM  

E-Print Network (OSTI)

POSITION MANAGEMENT ACTION FORM Workforce Planning | 408-924-2250 classcomp@sjsu.edu SJSU Human FOR POSITION MANAGEMENT FORM Workforce Planning | 408-924-2250| classcomp@sjsu.edu SJSU Human Resources Revised contact your Workforce Planning Analyst. List the name of the position this position reports to

Eirinaki, Magdalini

147

Restoration 2013 ACTION PLAN  

E-Print Network (OSTI)

Study Taskforce, Lower Columbia Fish Recovery Board, Lower Columbia Estuary Partnership, National Marine are intended to guide or inform, as appropriate, the Actions Agencies (BPA/Corps), National Marine Fisheries was prepared by the BPA/Corps with review by and collaboration with regional restoration sponsors, researchers

148

Replacing Incandescent Lightbulbs and Ballasts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Incandescent Lightbulbs and Ballasts Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts July 29, 2012 - 5:16pm Addthis Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. What does this mean for me? For the greatest energy efficiency, use new fixtures with new lightbulbs. Replace A-type lightbulbs with more energy-efficient options such as CFLs, LEDs, and energy-saving (halogen) incandescents. Matching replacement lightbulbs to existing fixtures and ballasts can be tricky, especially with older fixtures. Using new fixtures made for new lightbulbs gives you the greatest energy savings, reliability, and

149

Energy Replacement Generation Tax Exemption | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement Generation Tax Exemption Replacement Generation Tax Exemption Energy Replacement Generation Tax Exemption < Back Eligibility Commercial Industrial Local Government Residential Savings Category Water Buying & Making Electricity Bioenergy Wind Maximum Rebate None Program Info Start Date 01/01/2008 (retroactively effective) State Iowa Program Type Corporate Exemption Rebate Amount 100% exemption for self-generators, landfill gas and wind Reduced rate for large hydro Provider Iowa Department of Revenue Iowa imposes a replacement generation tax of 0.06 cents ($0.0006) per kilowatt-hour (kWh) on various forms of electricity generated within the state. This tax is imposed in lieu of a property tax on generation facilities. Under the Energy Replacement Generation Tax Exemption, the following

150

DOE/EA-1497: Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Intake Pipeline Replacement Project, Cameron and Calcasieu Parishes, Louisiana (8/31/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FINDING OF NO SIGNIFICANT IMPACT RAW WATER INTAKE PIPELINE REPLACEMENT STRATEGIC PETROLEUM RESERVE WEST HACKBERRY FACILITY AGENCY: Department of Energy (DOE) ACTION: Finding of No Significant Impact (FONSI) SUMMARY: DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of

151

August 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-31-2001 7-31-2001 Activity Summary In Conversion-4 In Preparation-43 Out for Comment-17 Published this Month-0 5-year Review Status Revision in Progress-6 Reaffirmation in Progress-23 Cancellation Pending-4 Cancellation in Progress-12 Proposed for Cancellation-13 No Current Action-11 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standard Recently Reaffirmed 1 DOE Technical Standards Recently Published 2 American National Standards Institute 2 American National Standards 4 American Society for Testing and Materials 5 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- August 2001 Standards

152

April 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-27-2008 3-27-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in March - 0 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ April 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

153

Standards Actions, July 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2001 6-27-2001 Activity Summary In Conversion - 4 In Preparation - 42 Out for Comment - 15 Published this Month - 1 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standard Recently Published 1 American National Standards Institute 2 American National Standards 3 American Society for Testing and Materials 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. July 2001 Standards Actions DOE Technical Standards Projects Initiated

154

July 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2007 6-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed forReaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/ July 2007 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

155

October 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publication Staff Roster 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-26-2006 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 16 Published in September - 1 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ October 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access

156

Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

157

February 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards Program Document Status 1-18-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 10 Published in January - 3 5-year Review Status Proposed for Revision-6 Revision in Progress-4 Proposed for Reaffirmation-3 Reaffirmation in Progress-21 Cancellation Pending-16 Cancellation in Progress-0 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/ February 2005 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://tis.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

158

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

159

July 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards Program Document Status 06-28-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 14 Published in June - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ July 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

160

SAVEnergy Action Plans  

SciTech Connect

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

May 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-25-2008 4-25-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in April - 2 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ May 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

162

February 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Technical Standards Program Document Status Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ Activity Summary In Conversion - 4 In Preparation - 35 Out for Comment - 18 Published this Month - 1 FY 2001 5-year Reviews Revisions in Progress - 2 Reaffirmations in Progress - 2 Supersedures in Progress - 6 Cancellations Pending - 11 Cancellations in Progress - 33 No Current Action - 16 DOE Technical Standards Project Canceled If you have any questions about this action, please contact the person listed be- low. The following DOE Technical Standards project was recently canceled: * EM Facility Hazard Categorization, Project Number SAFT-0029; EM Technical Standards Manager, John Serocki, 301-903-7999, John.Serocki@em.doe.gov, or Tom Wright, 301-903-3661, Tom.Wright@em.doe.gov. The need for this

163

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

164

February 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2

165

November 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-25-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 16 Published in September - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6

166

November 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Revisions 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association

167

April 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 Technical Standards Published 2 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical

168

April 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status

169

Household actions can provide a behavioral wedge to rapidly reduce US carbon emissions  

Science Journals Connector (OSTI)

...56.3 50 31.4 5.02 Change HVAC air filters M 8.7 30 3.7 0.59 Tune...actions (e.g., changing air filters in HVAC systems, vehicle maintenance) are...Maintenance of Equipment. Change HVAC air filters: replace home ventilation...

Thomas Dietz; Gerald T. Gardner; Jonathan Gilligan; Paul C. Stern; Michael P. Vandenbergh

2009-01-01T23:59:59.000Z

170

CLEMSON UNIVERSITY Sustainability Action Plan  

E-Print Network (OSTI)

.......................................................................... 8 Action Steps for Sustainability Education, Culture, and Leadership CLEMSON UNIVERSITY Sustainability Action Plan Submitted by the President's Commission on Sustainability, August 1, 2011 Version 1.0.9 #12; 1 Table of Contents President

Duchowski, Andrew T.

171

Remarks at the Capability Replacement Laboratory (CRL) Completion Ceremony  

NLE Websites -- All DOE Office Websites (Extended Search)

at the Capability Replacement Laboratory (CRL) Completion Ceremony at the Capability Replacement Laboratory (CRL) Completion Ceremony by Deputy Administrator Anne M. Harrington | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Speeches > Remarks at the Capability Replacement Laboratory (CRL) ... Speech Remarks at the Capability Replacement Laboratory (CRL) Completion Ceremony

172

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site October 22, 2013 - 11:01am Addthis What does this project do? Goal 1. Protect human health and the environment In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to replace an aging water monitoring flume and avoid future repairs that could interrupt data collection. The flume for Rocky Flats Legacy Management Agreement (RFLMA) Point of Evaluation (POE) monitoring location GS10 in South Walnut Creek was located at the bottom of fairly steep channel banks. The bank on the south side shows localized slumping and sliding toward the creek and GS10. Although

173

Laboratory Evaluation of LED T8 Replacement Lamp Products  

SciTech Connect

A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

2011-05-23T23:59:59.000Z

174

Suez SNC-Lavalin Nuclear to replace US steam generator  

Science Journals Connector (OSTI)

SNC-Lavalin Nuclear (USA) has signed a contract with Xcel Energy to replace the Unit #2 steam generators at the Prairie Island Nuclear Generating Plant (PINGP) in Welch, Minnesota.

2010-01-01T23:59:59.000Z

175

Y-12 Public Warning Siren System being replaced, tested this...  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2012 - 1:08pm The Y-12 Public Warning Siren System (PWSS) located around the Oak Ridge area is being replaced this month with a test of the new system to follow. A private...

176

EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

177

Washington State Department of Ecology: Replacement Wells Requiring...  

Open Energy Info (EERE)

Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

178

Developing a total replacement cost index for suburban office projects  

E-Print Network (OSTI)

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

179

Embryo collection and attempted replacement in the mare  

E-Print Network (OSTI)

EMBRYO COLLECTION AND ATTEMPTED REPLACEMENT IN THE MARE A Thesis by JANE SALISBURY BEACH Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE August 1983... Major Subject: Veterinary Physiology EMBRYO COLLECTION AND ATTEMPTED REPLACEMENT IN THE MARE A Thesis by JANE SALISBURY BEACH Approved as to style and content by: D. C. Kra'emer (Chairman of Committee) J. L. Kreider' (Member) J. G. Anderson...

Beach, Jane Salisbury

2012-06-07T23:59:59.000Z

180

Environmental Assessment - Proposed Actions  

NLE Websites -- All DOE Office Websites (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Standards Actions, February 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standards Recently Published 1 Non-Government Standards 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 5 American Society for Testing and Materials (ASTM) 6 American Nuclear Society (ANS) 11 National Fire Protection Association (NFPA) 12 DOE Technical Standards Program Document Status 01-23-2004 Activity Summary In Conversion - 4 In Preparation - 36 Out for Comment - 23 Published in January - 3 5-year Review Status Revision in Progress - 13 Reaffirmation in Progress - 26 Cancellation Pending - 1 Cancellation in Progress - 3 No Current Action - 0 Inside This Visit the Technical Standards Program

182

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

183

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

184

July 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 06-28-2005 Activity Summary In Conversion - 4 In Preparation - 21 Out for Comment - 10 Published in June - 2 5-year Review Status Proposed for Revision-6 Revision in Progress-3

185

April 2011 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3009 3009 Revision * DOE Standard 1066 Revision * New DOE Standards Projects * Incidents of Security Concern Technical Standard * Explosives Safety * Operations Assessment Field Handbook * Reporting of Radioactive Sealed Sources Program * Occurrence Reporting Causal Analysis Guide * Nuclear Safety-Related Standards Activity INSIDE THIS ISSUE April 2011 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Standard 3009 Revision The Office of Nuclear Safety Policy and Assistance (HS-21), within the Office of Health, Safety and Security (HSS), conducted workshops in January and March to support a major revision of Department of Energy (DOE) Standard 3009, Preparation Guide for U.S. Department of Energy Nonreactor

186

August 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 07-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

187

October 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-27-2007 Activity Summary In Conversion - 4 In Preparation - 26 Out for Comment - 27 Published in September - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

188

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

189

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

190

April 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 1 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 3-28-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 11 Published in March - 0 5-year Review Status Proposed for Revision-6 Revisions in Progress-4 Proposed for Reaffirmation-3 Reaffirmations in Progress-24 Cancellations Pending-11 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards

191

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

192

August 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 16 Published in July - 2 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0

193

Microsoft Word - CX-Satsop-Aberdeen_Tower-Replacement_FY10_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of twenty 22-L structures on the Satsop-Aberdeen No. 2 230-kV Transmission Line PP&A Project No.: 1704 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective...are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The Project is located in Gray's Harbor County, Washington between the towns of Aberdeen and Central Park, Washington. The Project is located in the following sections:

194

Microsoft Word - CX-FY11PascoDistrictWoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Toby Cossairt Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line rights-of-way (ROW) in the Pasco District. The following lines will have pole change-outs in 2011: Benton-Scooteney #1, Benton-Othello #1, Franklin-Hedges #1, Franklin-Walla Walla #1, Grandview-Red Mountain #1, Franklin-Badger Canyon #2, Kennewick Tap to Franklin- Badger Canyon #2, McNary-Franklin #2, and White Bluffs-Richland #1. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads,

195

Microsoft Word - CX-KalispellTLMDistrictFY11WoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleareance Memorandum Cleareance Memorandum Michael Stolfus Lineman Foreman III - TFKF-Kalispell Kurt Marsh Lineman Foreman I - TFKF-Kalispell Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line rights-of-way in Bonneville Power Administration's (BPA) Kalispell District. PP&A Project No: 1839 (Garrison-Anaconda #1), 1840 (Hot Springs-Rattlesnake #1), 1841 (Rattlesnake-Garrison #1), 1842 (Columbia Falls-Kalispell #1), 1843 (Kalispell-Kerr #1), 1844 (Libby-Bonners Ferry #1), 1845 (Columbia Falls-Trego #1) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a

196

Microsoft Word - CX-PascoDistrictPoleReplacement_FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor access road maintenance along the Franklin-Badger Canyon #2 and Walla Walla-Pendleton #1 transmission line rights-of-way in the Pasco District. PP&A Project No.: 2655 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: Franklin-Badger Canyon #2 and Walla Walla-Pendleton #1 transmission lines located within the Pasco District. See table below for structure locations on the corresponding transmission lines: Transmission Line/ROW Structure # Township Range Section County, State Franklin-Badger Canyon

197

Microsoft Word - CX-Drummond-MacksInn_WoodPoleReplacementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10, 2012 10, 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacements along the Drummond-Macks Inn, Macks Inn- Madison, and Targhee Tap 115-kV transmission line rights-of-way. PP&A Project Number: 2191 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... Location: The project area is located in Bonneville Power Administration's (BPA) Idaho Falls District. Project locations are listed below: Project Location Township Range Section(s) County Line Name Structures Use Ownership 4N 45E 11 Teton Targhee Tap 8/8 Agriculture Private 14N 44E 22 Fremont Macks Inn- Madison

198

Microsoft Word - CX-WenatcheeDistrictPoleReplacementFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2013 2, 2013 REPLY TO ATTN OF: KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Joseph Lauer Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line right-of-ways in Bonneville Power Administration's (BPA) Wenatchee District. The following lines will have pole change-outs in 2013: Grandview-Red Mountain #1 and Columbia-Valhalla #2. PP&A Project No.: 2604 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities. Location: Various transmission lines located within the Wenatchee District. See Project Location Attachment for structure locations and corresponding transmission lines.

199

Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50.2 50.2 (07-95) Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE 6. DATE NEXT REGULAR STEP INCREASE IS DUE: 7. LIST ANY AWARDS OR QUALITY INCREASES RECEIVED IN LAST 5 YEARS (Date and kind of award) ATTACH A COMPLETED SF-52, "REQUEST FOR PERSONNEL ACTION," AND A COPY OF THE EMPLOYEE'S CURRENT RATING OF RECORD AS DOCUMENTATION THAT PERFORMANCE HAS MET ALL THE REQUIREMENTS FOR AN OUTSTANDING RATING. NAME AND TITLE OF NOMINATING OFFICIAL (Employee's immediate supervisor) 1. NAME OF NOMINEE 3. ORGANIZATION LOCATION OF POSITION 2. POSITION TITLE, GRADE AND STEP 4. RECOMMENDATION COVERS SERVICE FROM (DATE): TO: SIGNATURE DATE NAME AND TITLE OF REVIEWING OFFICIAL (If required by organization)

200

Microsoft Word - CX-EllensburgTLMDistrictFY11WoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-Schultz Joe Lauer Line Foreman I - TFWF-Schultz Proposed Action: Wood pole replacement and minor access road maintenance along portions of the Columbia-Valhalla #1 and #2 transmission line rights-of-way. PP&A Project No: 1851 (Columbia-Valhalla #1), 1852 (Columbia-Valhalla #2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project area is located in Douglas and Chelan counties, Washington. Project

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Microsoft Word - CX-FY11WenatcheeDistrictWoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line rights-of-way (ROW) in the Wenatchee District. The following lines will have pole change-outs in 2011: Chandler Tap, Grandview-Red Mt. #1 and Midway-Moxee #1. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose.

202

Microsoft Word - CX-FY10_Kalispell_District_Wood_Pole_Replacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Michael Stolfus Lineman Foreman III - TFKF-Kalispell Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line right-of-ways in the Kalispell District PP&A Project No: 1536 (Columbia Falls-Kalispell #1), 1537 (Anaconda-Silver Bow #1), 1538 (Columbia Falls-Trego #1), 1541 (Libby-Bonners Ferry #1), 1542 (Rattlesnake-Garrison #1) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a

203

Microsoft Word - CX-SpokaneDistrictWoodPoleReplacementsFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Amanda Williams Project Manager - TEP-TPP-1 Proposed Action: 2013 Spokane District Wood Pole Replacement Projects PP&A Project No.: 2131 (Albeni Falls-Sand Creek No. 1), 2132 (Bronx-Sand Creek No. 1), 2492 (Albeni Falls-Pine Street No. 1), 2133 (Bell-Boundary No. 3), 2134 (Bell-Addy No. 1), 2135 (Bell-Trentwood No. 1), 2136 (Bell-Trentwood No. 2), 2137 (Libby-Bonners Ferry No. 1), 2493 (Boundary-Nelway #1), 2494 (Colville-Boundary #1), 1547 (Four Lakes Tap), 2138 (Green Bluff Tap), 2495 (Sand Creek-Bonners Ferry No. 1 and No. 2), and 1929 (Spirit Tap) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance

204

Microsoft Word - CX-Minidoka-Unity_Wood PoleReplacementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2012 , 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacement along the Minidoka Power House-Unity No. 1 and Unity-Heyburn No. 1, 138-kV transmission line rights-of-way. PP&A Project No.: 2192 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project area is located in Cassia County, Idaho, in Bonneville Power

205

Microsoft Word - CX-Drummond-MacksInn-WoodPoleReplacementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2012 29, 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacements along the Drummond-Macks Inn, Macks Inn- Madison, and Swan Valley-Teton 115-kilovolt (kV) transmission line rights-of-way. PP&A Project Number: 2486 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The project area is located in Bonneville Power Administration's (BPA) Idaho Falls District. Project locations are listed below: Project Location Township Range Section(s) County Line Name Structures Use Ownership 3N 44E 28 Teton Swan Valley - Teton 10/6 Forest Forest Service 14S 5E 19 Fremont

206

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Temp Data Fields Matthews, Patrick...

207

Standards Actions - August 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

208

February 2013 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Standards Actions Technical Standards Program Newsletter U . S . D E PA R T M E N T O F O ffi ce O f nuclear SaFety ENERGY inSide thiS iSSue * Featured DOE Technical Standards Activities * DOE Technical Standards Cost- Savings and Access Improvement Initiative * Domestic and International Nuclear Energy Voluntary Consensus Standards Needs * Nuclear Safety- Related Standards Activity Featured dOe technical StandardS activitieS DOE Technical Standards Cost-Savings and Access Improvement Initiative By Helen Todosow, Brookhaven National Laboratory The Department of Energy (DOE) Technical Standards Managers (TSM) are actively exploring ways to save the government and tax payers' money while at the same time significantly improving efficiencies in access and use of voluntary consensus

209

Standards Actions, April 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canceled Canceled The following DOE Technical Standards projects were recently canceled. If you have any questions about this action, please contact the persons listed below. • Accelerated Learning - A Systematic Approach, Project Number 6910-0061; Eula Baldwin, EH-31; 208-526-9472, egb@inel.gov. The need for this document no longer exists. • Environmental Safety and Health Configuration Guide, Project Number FACR-0013; Chan- dra S. Majumdar, EM-23; 301-903-7904, Fax 301-903-4423, Chandra.Majumdar @em.doe.gov. The need for a DOE Technical Standard on this matter no longer exists. • Occupational Safety and Health Handbook, Project Number HFAC-0011; Terry Krietz, EH-51; 301-903-6456, Fax 301-903-2239, Terry.Krietz@hq.doe.gov. The need for this document no longer exists.

210

Standards Actions - May 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Canceled Project Canceled The following DOE Technical Standards project was recently canceled. If you have any questions about this action, please contact the person listed below. • Equipment Qualification Program for DOE-Owned Nuclear Facilities and Operations, Project Number FACR-0012; Samuel Rosenbloom, EH-31; 301-903-5749, Fax 301-903- 8693, Samuel.Rosenbloom@eh.doe.gov. The need for this document no longer ex- ists. DOE Technical Standards Recently Published The following DOE Technical Standard has recently been published: • DOE-STD-1063-2000, Facility Representatives, March 2000. This document updates and supersedes DOE-STD-1063-97, October 1997. DOE employees and DOE contractors may obtain copies from the ES&H Technical Infor- mation Services, U.S. Department of Energy; 1-800-473-4375, Fax 301-903-9823.

211

Description of Proposed Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

212

Standards Actions - January 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Initiated Projects Initiated The following DOE Technical Standards projects were recently initiated. If you have any questions or are interested in participating in the development of these stan- dards, please contact the per- sons listed below. • Establishing and Maintaining a Facility Representative Pro- gram at DOE Facilities , Project Number MGMT-0003 (revision of DOE-STD-1063-97); David Compton, S-3.1, 202-586-1034, Fax 202-586-3472, David .Compton@hq.doe.gov. • Nuclear Explosive Safety Study Process, Project Number SAFT- 0074 (Revision of DOE-STD- 3015-97); Helmut Filacchione, DP-21, 301-903-7519, Fax 301- 903-8628, Helmut.Filacchione @hq.doe.gov. DOE Technical Standards Project Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact

213

January 2012 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* DOE Conduct of Operations Standards Revisions * New DOE Standards Projects * DOE Handbook of Operational Safety and Analysis Techniques * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE January 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Conduct of Operations Standards Revisions In the early 1990s, the Department of Energy (DOE) developed 17 technical standards to support DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The standards (STDs), listed below, provided examples, good practices, and expanded explanations of the topics in each chapter of the Order. In June 2010, the Order was revised and issued as DOE Order 422.1, Conduct of Operations. The

214

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

215

Standards Actions - August 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

216

Replacing the Icon: Seventeenth-Century Tomb Monuments for Dutch Naval Heroes by Rombout Verhulst  

E-Print Network (OSTI)

RIVERSIDE Replacing the Icon: Seventeenth-Century Tombused to replace destroyed icons in the majority of thethe pre-Reformation icons. 29 28. Scholten, Sumptuous

Osenbaugh, Elizabeth Ryan

2011-01-01T23:59:59.000Z

217

Actions to promote energy-efficient electric motor repair  

Science Journals Connector (OSTI)

Electric motors are repaired 2-3 times over their lifetime. Poor repair practices, particularly widespread in developing countries, can lead to a significant increase in motor losses. It is estimated that worldwide poor repair leads to annual electricity losses of approximately 40 TWh, representing 20 Mtons of CO2 emissions. The main objective of this paper is to provide a technical basis for designing demand side management actions, which address the motor repair market. This paper brings into focus motor repair process trends, energy-efficient motors, typical repair process, actions to promote energy-efficient motor repair, energy-efficient motor rebate schemes to replace old, badly damaged motors and the factors influencing payback. This paper will be useful to energy policy makers, and Demand Side Management (DSM) staff in energy agencies and electric utilities.

Aníbal T. de Almeida; Fernando J.T.E. Ferreira

2003-01-01T23:59:59.000Z

218

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt Discovery Replaces Precious Metals Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

219

Public Invited to Comment on Draft Environmental Assessment for Replacement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site September 1, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

220

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Replacement of Data from IHS With Those from HPDI  

U.S. Energy Information Administration (EIA) Indexed Site

Replacement of Data from IHS With Those from HPDI Replacement of Data from IHS With Those from HPDI The EIA-914 estimation methodology published in September 2005 used data from IHS, Inc., as a source for calibration of historical monthly production data. As of August 2006, these data have been replaced with data from HPDI, LLC. EIA does not have access to both the full IHS and the HPDI data for an overlap period sufficiently long to allow comprehensive model estimation under both data sources and analysis of the effects on the model estimates of the change from IHS to HPDI. Comparisons of IHS and HPDI data series, however, reveal no evidence of any large or systematic differences between the raw IHS and HPDI estimates that serve as model inputs. Figure 1 illustrates the overall order of magnitude of the differences between

222

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt discovery replaces precious metals Cobalt discovery replaces precious metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

223

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt Discovery Replaces Precious Metals Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

224

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

225

Information Resources: LED Replacements for Linear Fluorescent Lamps  

NLE Websites -- All DOE Office Websites (Extended Search)

Replacements for Linear Fluorescent Lamps Webcast Replacements for Linear Fluorescent Lamps Webcast In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting Facts-listed products as well as products evaluated in the latest CALiPER reports. Eric Richman, also of PNNL, reported on a recently completed GATEWAY demonstration project, in which LED and fluorescent lamps were installed in a variety of recessed troffer luminaires for comparison in an office environment. The presentation concluded with a discussion of specifications listed in a newly updated technology fact sheet. View presentation slides View the text-alternative version View the webcast (WMV 16 MB) Download Windows Media Player

226

Ethics to guide environmental action  

Science Journals Connector (OSTI)

Ethics to guide environmental action ... "Environmental Ethics: Choices for Concerned Citizens" is advertised as "a timely guide" for persons wanting "a balanced yet ecologically conscious life-style." ...

1980-12-08T23:59:59.000Z

227

Action Plan UNIVERSITY OF MISSOURI  

E-Print Network (OSTI)

Energy, Energy Economics and Policy, and Energy-related Commercialization & Business Development. Other, transportation will play a larger role in its greenhouse gas profile. The Climate Action Plan recommends sustain- ability plan. While the initial Climate Action Plan focuses primarily on greenhouse gas emissions

Taylor, Jerry

228

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network (OSTI)

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

229

USING NEURAL NETWORKS FOR WEB PROXY CACHE REPLACEMENT  

E-Print Network (OSTI)

USING NEURAL NETWORKS FOR WEB PROXY CACHE REPLACEMENT by JAKE COBB Advisor HALA ELAARAG A senior ................................................................................................................. 22 #12;1 ABSTRACT Web traffic has continued to increase at a significant rate and is resulting in considerable strain on web servers and bandwidth providers, such as Internet Service Providers (ISP). Proxy

Miles, Will

230

New energy replacement method for resonant power supplies  

SciTech Connect

The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab.

Karady, G.G.; Thiessen, H.A.

1989-01-01T23:59:59.000Z

231

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories?  

E-Print Network (OSTI)

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories? N. D. Finkelstein, K, Boulder Abstract. This paper examines the effects of substituting computer simulations in place of real (DC) circuit laboratory was modified to compare the effects of using computer simulations

Colorado at Boulder, University of

232

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

233

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

234

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS  

E-Print Network (OSTI)

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS Guy Roussel on the uninspected part of the tubing. 1 INTRODUCTION In Pressurized Water Reactors, a program of periodic in for determining the percentage of tubes sampled is to provide, by means of a statistical analysis, an equation

Cizelj, Leon

235

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network (OSTI)

upgrading electrical equipment to energy efficient models, including conductor sizing, overcurrent protective devices, grounding, and harmonics. The pages that follow provide guidance in the decision-making process when replacing electrical equipment... equipment. Several areas of compatibility must be addressed for equipment to work properly. Critical areas of concern are conductor sizing, overcurrent protection devices, grounding, and harmonics. Conductor Sizing Conductors are sized...

Massey, G. W.

2005-01-01T23:59:59.000Z

236

HVAC & Building Management Control System Energy Efficiency Replacements  

SciTech Connect

The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

Hernandez, Adriana

2012-09-21T23:59:59.000Z

237

The deep water gas charged accumulator and its possible replacements  

E-Print Network (OSTI)

not be affected by the increasing hydrostatic pressure of water as a function of water depth. Springs and heavy weights will be discussed as two options to replace nitrogen in accumulators. Efficient deep water accumulators would reduce the number of accumulators...

Mir Rajabi, Mehdi

2006-04-12T23:59:59.000Z

238

Effect of spacer layer thickness on multi-stacked InGaAs quantum dots grown on GaAs (311)B substrate for application to intermediate band solar cells  

Science Journals Connector (OSTI)

We have investigated the properties of multi-stacked layers of self-organized In0.4Ga0.6As quantum dots(QDs) on GaAs (311)B grown by molecular beam epitaxy. We found that a high degree of in-plane ordering of QDs structure with a six-fold symmetry was maintained though the growth has been performed at a higher growth rate than the conventional conditions. The dependence of photoluminescence characteristics on spacer layer thickness showed an increasing degree of electronic coupling between the stacked QDs for thinner spacer layers. The external quantum efficiency for an InGaAs/GaAs quantum dotsolar cell (QDSC) with a thin spacer layer thickness increased in the longer wavelength range due to additive contribution from QD layers inserted in the intrinsic region. Furthermore a photocurrent production by 2-step photon absorption has been observed at room temperature for the InGaAs/GaAs QDSC with a spacer layer thickness of 15?nm.

Yasushi Shoji; Kohei Narahara; Hideharu Tanaka; Takashi Kita; Katsuhiro Akimoto; Yoshitaka Okada

2012-01-01T23:59:59.000Z

239

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network (OSTI)

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

240

Action Item Review and Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Do good actions inspire good actions in others?  

E-Print Network (OSTI)

Actions such as sharing food and cooperating to reach a common goal have played a fundamental role in the evolution of human societies. These good actions may not maximise the actor's payoff, but they maximise the other's payoff. Consequently, their existence is puzzling for evolutionary theories. Why should you make an effort to help others, even when no reward seems to be at stake? Indeed, experiments typically show that humans are heterogeneous: some may help others, while others may not. With the aim of favouring the emergence of 'successful cultures', a number of studies has recently investigated what mechanisms promote the evolution of a particular good action. But still little is known about if and how good actions can spread from person to person. For instance, does being recipient of an altruistic act increase your probability of being cooperative with others? Plato's quote, 'Good actions give strength to ourselves and inspire good actions in others', suggests that is possible. We have conducted an e...

Capraro, Valerio

2014-01-01T23:59:59.000Z

242

Stochastic Ratchet Mechanisms for Replacement of Proteins Bound to DNA  

E-Print Network (OSTI)

Experiments indicate that unbinding rates of proteins from DNA can depend on the concentration of proteins in nearby solution. Here we present a theory of multi-step replacement of DNA-bound proteins by solution-phase proteins. For four different kinetic scenarios we calculate the depen- dence of protein unbinding and replacement rates on solution protein concentration. We find (1) strong effects of progressive 'rezipping' of the solution-phase protein onto DNA sites liberated by 'unzipping' of the originally bound protein; (2) that a model in which solution-phase proteins bind non-specifically to DNA can describe experiments on exchanges between the non specific DNA- binding proteins Fis-Fis and Fis-HU; (3) that a binding specific model describes experiments on the exchange of CueR proteins on specific binding sites.

Simona Cocco; John F. Marko; Remi Monasson

2014-05-26T23:59:59.000Z

243

L Prize Competition Winner 60W Incandesent Replacement Lamp Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Deployment Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International May 23, 2012 Philips Wins First L Prize 2 * August 3, 2011: Philips announced as winner of 60W replacement bulb category * Product distributed thru commercial and retail channels Image courtesy of Philips -...[O]nce an award is made the authorizing Act directs General Services Administration to develop federal purchasing schedules for solid-state lamps that meet or exceed the specifications laid out in the prize category-so long as it is cost effective. I hope the GSA begins this process soon.‖

244

ICDF Complex Remedial Action Report  

SciTech Connect

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

245

Recapping National Energy Action Month  

Energy.gov (U.S. Department of Energy (DOE))

Energy Department officials spent National Energy Action Month on the road, meeting and learning from Americans who are advancing our energy security, growing the economy and protecting the environment.

246

OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement  

Energy.gov (U.S. Department of Energy (DOE))

With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

247

Life Cycle Optimization of Automobile Replacement:? Model and Application  

Science Journals Connector (OSTI)

Life Cycle Optimization of Automobile Replacement:? Model and Application ... Moreover, manufacturers have been exploring new propulsion systems and fuels, such as hybrid electric vehicles and hydrogen fuel cell vehicles. ... The catalytic activity of samples taken from an oxidation catalyst mounted on diesel-driven automobiles and aged under road conditions was recovered to a significant extent by washing with a dilute solution of citric acid. ...

Hyung Chul Kim; Gregory A. Keoleian; Darby E. Grande; James C. Bean

2003-11-01T23:59:59.000Z

248

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

249

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

250

The National Energy Policy Act and lamp replacement options  

SciTech Connect

The National Policy Act of 1992 involves the creation of energy efficiency standards for a wide range of products including fluorescent and incandescent lamps. Minimum efficacy (lumens per watt) and color rendering index (CRI) standards are mandated for the popular fluorescent lamps: four-foot medium bi-pin, two-foot U-bent, eight-foot slimline and eight-foot high output. Minimum efficacies are mandated for specific incandescent R and PAR reflector lamps. These standards will affect selected colors and designs of fluorescent lamps, the most significant being the standard lamps in the cool white and warm white colors. The incandescent reflector lamps will include the R-30, R-40, PAR-38 lamps above 40 watts, excluding the halogen types. These efficiency and color rendering standards will require end-users and specifiers to select replacement fluorescent lamps from a range of performance characteristics (lumen output, efficacy, CRI and price). The choice of replacement for the R and PAR incandescent lamps will include the halogen designs and compact fluorescent designs. In this paper, replacement options will be analyzed and discussed and the effect of these options on the performance of the lighting system will be explored in detail.

Ryerson, C.

1995-06-01T23:59:59.000Z

251

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network (OSTI)

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

252

Sandia National Laboratories: International Smart Grid Action...  

NLE Websites -- All DOE Office Websites (Extended Search)

Smart Grid Action Network Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration,...

253

Energy Agency Coordinators for Energy Action Month  

Energy.gov (U.S. Department of Energy (DOE))

Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

254

The Standards Actions, January 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

initi- initi- ated. If you have any questions or are interested in participating in the development of these standards, please contact the persons listed below. Note: This announcement serves as a reaffirmation notice for the docu- ments listed below. No changes to these documents are required; how- ever, they will be reissued as DOE Handbooks. • Guide to Good Practices for De- veloping and Conducting Case Studies, Project Number TRNG- 0006 (will replace DOE-STD- 1058-93); Jim Pearrell, EH-31; 208-526-4379, FAX 208-526- 9650, jsp@inel.gov. • Guide to Good Practices for Con- tinuing Training, Project Number TRNG-0008 (will replace DOE- STD-1060-93); Jim Pearrell, EH-31; 208-526-4379, FAX 208-526- 9650, jsp@inel.gov. • Guide to Good Practices for the Selection, Training, and Qualifica-

255

Definition: Corrective Action Plan | Open Energy Information  

Open Energy Info (EERE)

Corrective Action Plan Corrective Action Plan Jump to: navigation, search Dictionary.png Corrective Action Plan A list of actions and an associated timetable for implementation to remedy a specific problem.[1] View on Wikipedia Wikipedia Definition Corrective action and preventive action (CAPA, also called corrective action / preventive action) are improvements to an organization's processes taken to eliminate causes of non-conformities or other undesirable situations. CAPA is a concept within good manufacturing practice (GMP). It focuses on the systematic investigation of the root causes of non-conformities in an attempt to prevent their recurrence (for corrective action) or to prevent occurrence (for preventive action). Corrective actions are implemented in response to customer complaints,

256

Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas  

SciTech Connect

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

Not Available

1993-09-01T23:59:59.000Z

257

Practical Action | Open Energy Information  

Open Energy Info (EERE)

Action Action Jump to: navigation, search Logo: Practical Action Name Practical Action Address The Schumacher Centre for Technology & Development, Bourton on Dunsmore, Rugby, Warwickshire Place Rugby, Warwickshire Zip CV21 1UB Phone number 01926 634400 Notes Practical Action works alongside communities to find practical solutions to the poverty they face. Website http://www.practicalaction.org Coordinates 52.3910875°, -1.2339112° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.3910875,"lon":-1.2339112,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

258

Replacing ESP controls brings large utility units into compliance  

SciTech Connect

This article examines the effect of retrofitting an electrostatic precipitator (ESP) digital control system on the emissions compliance of a large utility unit. The topics of the article include evaluation of ESP performance, determination of course of action, unit 1 and 2 installation of a digital control system, and results to emissions and performance of the ESP.

Hack, P. (Baltimore Gas and Electric Co., Lusby, MD (United States))

1994-05-01T23:59:59.000Z

259

A Centrifugal Contactor Design to Facilitate Remote Replacement  

SciTech Connect

Advanced designs of nuclear fuel recycling and radioactive waste treatment plants are expected to include more ambitious goals for solvent extraction based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, Annular Centrifugal Contactors (ACCs) are destined to play a more important role for such future processing schemes. This work continues the development of remote designs for ACCs that can process the large throughputs needed for future nuclear fuel recycling and radioactive waste treatment plants. A three stage, 12.5 cm diameter rotor module has been constructed and is being evaluated for use in highly radioactive environments. This prototype assembly employs three standard CINC V-05 clean-in-place (CIP) units modified for remote service and replacement via new methods of connection for solution inlets, outlets, drain and CIP. Hydraulic testing and functional checks were successfully conducted and then the prototype was evaluated for remote handling and maintenance. Removal and replacement of the center position V-05R contactor in the three stage assembly was demonstrated using an overhead rail mounted PaR manipulator. Initial evaluation indicates a viable new design for interconnecting and cleaning individual stages while retaining the benefits of commercially reliable ACC equipment. Replacement of a single stage via remote manipulators and tools is estimated to take about 30 minutes, perhaps fast enough to support a contactor change without loss of process equilibrium. The design presented in this work is scalable to commercial ACC models from V-05 to V-20 with total throughput rates ranging from 20 to 650 liters per minute.

David H. Meikrantz; Jack. D. Law; Troy G. Garn; Lawrence L. Macaluso

2011-03-01T23:59:59.000Z

260

Inspector General audit report on Transportation Safeguards Division courier work schedules and escort vehicle replacements  

SciTech Connect

The Office of Inspector General`s (OIG) April 1995 report found that couriers received too much overtime and incurred too much unproductive time. This finding occurred because the Transportation Safeguards Division (TSD) employed a traditional work schedule that did not meet the demands of the job. The report recommended implementing an alternative work schedule that corresponded more closely to the couriers` actual work requirements. Management agreed to conduct a comparative analysis of work schedules to evaluate potential savings. The objectives of this audit were to (1) follow up on actions taken as a result of the OIG`s previous report, (2) determine if courier work schedules are cost effective, and (3) determine the cost effectiveness of escort vehicle replacements. The authors recommend: (1) implementing an alternative work schedule for courier which would achieve savings in overtime and unproductive time, while efficiently and cost effectively fulfilling TSD`s mission; (2) reexamining and adjusting the staffing level of each courier section in relation to the workload requirements in the area; and (3) discontinuing payment for travel time between courier lodging and temporary duty stations. The Albuquerque Operations Office agreed with the auditor`s findings and recommendations.

NONE

1998-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Solid-State Lighting: LED Replacement Lamps: Current Performance and the  

NLE Websites -- All DOE Office Websites (Extended Search)

LED Replacement Lamps: Current LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® to someone by E-mail Share Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Facebook Tweet about Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Twitter Bookmark Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Google Bookmark Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Delicious Rank Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Digg Find More places to share Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on

262

Is it Cost-Effective to Replace Old Eddy-Current Drives? | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Is it Cost-Effective to Replace Old Eddy-Current Drives? Is it Cost-Effective to Replace Old Eddy-Current Drives? New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may...

263

CLIMATE ACTION PLAN JUNE 1, 2010  

E-Print Network (OSTI)

UC DAVIS 2009­2010 CLIMATE ACTION PLAN JUNE 1, 2010 #12;UC Davis 2009-2010 Climate Action Plan Page 2 UC DAVIS 2009-2010 CLIMATE ACTION PLAN TABLE OF CONTENTS Acknowledgements...................................................................................................... 24 Chapter 3: Emissions Reduction Actions 3.1 Energy Use Reduction to Date

Schladow, S. Geoffrey

264

The use of VLD (vive la difference) in the molecular-replacement approach: a pipeline  

Science Journals Connector (OSTI)

The VLD approach has been integrated into a molecular-replacement pipeline for automatic protein crystal structure solution.

Carrozzini, B.

2013-05-14T23:59:59.000Z

265

Use of the formula of dynamic discounted costs for determining the replacement cost of electrical energy  

Science Journals Connector (OSTI)

Determination of the replacement costs of fuel and electrical energy is of great theoretical and practical importance.

D. S. Shchavelev

1988-08-01T23:59:59.000Z

266

Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated.

NONE

1995-09-01T23:59:59.000Z

267

Operational Readiness Review: Savannah River Replacement Tritium Facility  

SciTech Connect

The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

Not Available

1993-02-01T23:59:59.000Z

268

Optimisation of gearbox replacement policy using vibration measurement data  

Science Journals Connector (OSTI)

Gearbox system reliability is a critical factor in the success of any industrial project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to the system due to its downtime. Indirectly, the acceptance of the system by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. However, this paper explores a reliability based on a developed an analytical mathematical method for predicting remaining lifetime of cracked gear tooth. The development is focused specifically on the investigation of a generalised statistical method for characterising and predicting system Weibull density function degradation (hazard rate). Using this method, optimal preventive age replacement policy is determined to maximise gearbox system reliability, and consequently an optimal cost analysis can be estimated. A simple geared system is used as a medium for real data collection, where the torsional vibration acceleration was measured and analysed. The results indicate that the knowledge of the remaining lifetime and the optimised replacement cost of the faulty gear can enhance the process of scheduling maintenance, ordering spare parts and using resources; consequently a reduction of maintenance cost.

Mohamed Ibrahim Khalil; Mohamed Sabry A. El-morsy; Shawki A. Abouel-seoud

2012-01-01T23:59:59.000Z

269

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA  

E-Print Network (OSTI)

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

270

Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2  

E-Print Network (OSTI)

1 Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2 3 replaced by18 chrysotile and brucite under high alkaline conditions. In our study, olivine replacement19 between olivine and chrysotile-brucite minerals. Coupled dissolution-precipitation21 led to the alteration

Paris-Sud XI, Université de

271

Climate Change Action Plan Report  

E-Print Network (OSTI)

Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

Hansen, Andrew J.

272

Know the symptoms. Take action.  

E-Print Network (OSTI)

1 " " Know the symptoms. Take action. heart attack c a l l Don't Take a Chance With a Heart Attack: Know the Facts and Act Fast More than 1 million people in the United States have heart attacks each attack happens, delay in treatment can be deadly. Learn the warning symptoms of a heart attack, and know

Bandettini, Peter A.

273

Know the symptoms. Take action.  

E-Print Network (OSTI)

heart attack Know the symptoms. Take action. c a l l Important Information Fill out the next two:____________________________ Home phone:_______________________ Work phone: ________________________ December 2011 #12;Heart Attack might be having heart attack symptoms or a heart attack, call 9­1­1 immediately. Don't ignore your pain

Bandettini, Peter A.

274

CLIMATE ACTION PLAN SEPTEMBER 2009  

E-Print Network (OSTI)

· ALBUQUERQUE, NEW MEXICO #12;#12;The University of New Mexico is committed to reducing energy usage and ourCLIMATE ACTION PLAN SEPTEMBER 2009 UNIVERSITY OF NEW MEXICO · OFFICE OF SUSTAINABILITY ................................ 18 C. Electricity Recommendation #1 Solar........... 21 D. Electricity Recommendation #2 Smart Grid

Maccabe, Barney

275

Climate Action Champions Informational Webinar  

Energy.gov (U.S. Department of Energy (DOE))

An informational webinar will be held on Thursday, Oct. 9 from 1:00 p.m. - 3:00 p.m. Eastern Standard Time (EST) to provide applicants with an overview of the Climate Action Champions opportunity, the application process, and answer any questions.

276

Compromise strategies for action selection  

Science Journals Connector (OSTI)

...10.1098/rstb.2007.2051 Howard, R 1977Risk preferenceIn Readings in decision analysisMenlo Park, CA:SRI International Humphrys, M. 1996 Action selection methods using reinforcement learning. PhD thesis, University of Cambridge...

2007-01-01T23:59:59.000Z

277

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~~Fs::::N ~~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration performed emergency construction activities to repair a levee, stabilize a bank, and complete drainage improvements as a result of damage incurred during recent heavy rains at the Jonesboro Maintenance Office and adjacent substation facility located in Craighead County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart 0 , Part B 2.5- Safety and environmental improvements of a facility, including replacement and upgrade of facility components, that do not result in a significant change in the

278

Categorical Exclusion (CX) Determination Proposed Action: Havre Substation, Stage 03.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Havre Substation, Stage 03. Havre Substation, Stage 03. Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the Havre Substation approximately 150 ft to the north to accommodate a new delivery service from the newly built Herron Substation by Hill County. The expansion also converts the existing 115-kV single bus into a ring bus which will improve reliability. Western is also expanding the yard to the east to accommodate the replacement of the existing control building and control boards. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.11: Construction of electric power substations .. . or modification of existing substations and support facilities . Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

279

Integration of RCRA corrective action with Clean Water Act compliance  

SciTech Connect

A synthetic fibers manufacturing facility is implementing an integrated phased program to upgrade its existing wastewater treatment plant (WWTP) to comply with both the Clean Water Act and the Resource Conservation and Recovery Act (RCRA). The existing WWTP consists of an influent settling basin, two equalization basins, two aeration basins with low- and high-speed aerators, three secondary clarifiers, post-aeration, and belt filter press dewatering with on-site landfilling. The existing WWTP will be replaced with a tank-based system that will include equalization, biological treatment, clarification, effluent filtration, and effluent diffusion. RCRA regulatory compliance incorporated the Corrective Action Program, the Toxicity Characteristic Rule, the Land Disposal Restrictions, and closure/postclosure requirements. Clean Water Act compliance incorporated the Organic Chemicals, Plastics, and Synthetic Fibers (OCPSF) effluent guidelines, effluent toxicity and general water quality requirements. Logistically, project implementation involved fast-track design and construction, close regulatory interface, and maintenance of production process continuity.

Cable, J.K.; Starlin, L.A.; Giltner, J.A.: Futch, R.S.; Ballard, R.W. (CH2M Hill, Atlanta, GA (United States))

1992-05-01T23:59:59.000Z

280

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoadsFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil Design/Access Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacement, equipment landing construction, and access road improvements along various transmission lines in Bonneville Power Administration's (BPA) Grand Coulee District. PP&A Project No.: 2152 (Grand Coulee-Chief Joseph No. 1), 2151 (Grand Coulee-Chief Joseph No. 2), 2121 (Grand Coulee-Foster Creek No. 1) and 1776 (Grand Coulee-Okanogan No. 2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Douglas and Okanogan counties, Washington. Refer to table below for project locations: Line Name Structure Township Range Section County

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF  

SciTech Connect

The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

Krementz, D.; Coughlin, Jeffrey

2009-05-05T23:59:59.000Z

282

Action  

National Nuclear Security Administration (NNSA)

and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http: www,nrc.govreading-rmadams.htmI. Persons who do not have access to...

283

FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device for a device that has been lost or stolen. Use and  

E-Print Network (OSTI)

FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device as those explained in the original Fuel Device Application and for your convenience provided on this form Information Lost Stolen Unknown Date of last known use Certification of Use I certify that fuel access device

Kirschner, Denise

284

Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace  

NLE Websites -- All DOE Office Websites (Extended Search)

4: October 17, 4: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel to someone by E-mail Share Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Facebook Tweet about Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Twitter Bookmark Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Google Bookmark Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Delicious Rank Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Digg Find More places to share Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on AddThis.com...

285

COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements  

NLE Websites -- All DOE Office Websites (Extended Search)

March 20, 2013, 4:15pm to 6:30pm March 20, 2013, 4:15pm to 6:30pm Colloquia MBG Auditorium COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements with Fungi Mr. Gavin McIntyre Ecovative Design LLC Colloquium Committee: The Princeton Plasma Physics Laboratory 2013-2014 Colloquium Committee is comprised of the following people. Please feel free to contact them by e-mail regarding any possible speakers or topics for future colloquia. Carol Ann Austin caustin@pppl.gov John Greenwald, Chair jgreenwa@pppl.gov Charles H. Skinner cskinner@pppl.gov Daren Stotler dstotler@pppl.gov Carol Ann Austin 609-243-2484 Contact Information Coordinator(s): Ms. Carol Ann Austin caustin@pppl.gov Host(s): Ms. Kelsey Tresemer ktreseme@pppl.gov PPPL Entrance Procedures Visitor Information, Directions, Security at PPPL

286

Experimental Results on Statistical Approaches to Page Replacement Policies  

SciTech Connect

This paper investigates the questions of what statistical information about a memory request sequence is useful to have in making page replacement decisions: Our starting point is the Markov Request Model for page request sequences. Although the utility of modeling page request sequences by the Markov model has been recently put into doubt, we find that two previously suggested algorithms (Maximum Hitting Time and Dominating Distribution) which are based on the Markov model work well on the trace data used in this study. Interestingly, both of these algorithms perform equally well despite the fact that the theoretical results for these two algorithms differ dramatically. We then develop succinct characteristics of memory access patterns in an attempt to approximate the simpler of the two algorithms. Finally, we investigate how to collect these characteristics in an online manner in order to have a purely online algorithm.

LEUNG,VITUS J.; IRANI,SANDY

2000-12-08T23:59:59.000Z

287

Emergencies and Emergency Actions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergencies and Emergency Actions Emergencies and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. September 8, 2005 Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina;

288

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

289

Chicago Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Action Plan Action Plan Jump to: navigation, search Name Chicago Climate Action Plan Agency/Company /Organization City of Chicago Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Prepare a Plan Topics Low emission development planning Resource Type Case studies/examples Availability Free Website http://www.chicagoclimateactio Locality Chicago, IL References Chicago Climate Action Plan[1] Overview Chicago's Climate Action Plan addresses both mitigation of and adaptation to climate change and encompasses the entire city (rather than only City operations). The plan contains a high-level overview of Chicago's climate action initiatives, including 26 mitigation strategies and nine adaptation

290

De-fatted fish meal as a source of protein in a milk replacer for dairy calves  

E-Print Network (OSTI)

greater feed efficiency. Scours and unthrifti- ness accompanied the calves on milk replacers. Though this report did not designate the composition of the replacers used, it does indicate the need for improved milk replacers. Suitable sources of energy... greater feed efficiency. Scours and unthrifti- ness accompanied the calves on milk replacers. Though this report did not designate the composition of the replacers used, it does indicate the need for improved milk replacers. Suitable sources of energy...

Wilson, Kenneth Owen

2012-06-07T23:59:59.000Z

291

The Standards Actions, October 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Actions October 1996 Documents Recently Published The following DOE documents have recently been published: * DOE-SPEC-3018-96, Flooded-Type Lead-Acid Storage Batter- ies, August 1996. * DOE-SPEC-3019-96, Valve- Regulated Type Lead-Acid Storage Batteries, August 1996. * DOE-TSL-1-96, Department of Energy Standards Index, August 1996. * DOE-TSL-4-96, Directory of DOE and Contractor Personnel Involved in Non-Government Standards Activities, August 1996. DOE employees and DOE contractors may obtain copies from the DOE Office of Scientific and Technical Information (OSTI), P.O. Box 62, Oak Ridge, Tennes- see 37831; telephone 423-576-8401 or FAX 423-576-2865. Subcontractors and the general public may obtain copies from the U.S. Department of Commerce, Technology Administration,

292

AGENCY: ACTION: DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION: ACTION: DEPARTMENT OF ENERGY Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 Naval Petroleum and Oil Shale Reserves U.S. Department of Energy (DOE) Finding of No Significant Impact (FONSI) for the Transfer of Naval Petroleum Reserve No. 3 (DOE/EA-1236) SUMMARY: The Secretary of Energy is authorized to produce the Naval Petroleum Reserves No. 3 (NPR-3) at its maximum efficient rate (MER) consistent with sound engineering practices, for a period extending to Apr115 2000 subject to extension. Production at NPR-3 peaked in 1981 and has declined since until it has become a mature stripper field, with the average well yielding less than 2 barrels per day. The Department of Energy (DOE) has decided to discontinue Federal operation of NPR-3 at the end of its life

293

The Standards Actions, January 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Actions Resistance of HVAC Air Ducts and Fittings (new standard); comments due February 6, 1996. * ISO/ASQC A3534-1, Statis- tics - Vocabulary and Sym- bols - Probability and Gen- eral Statistical Terms (new standard); comments due January 26, 1996. * ISO/ASTM/ASQC/NSF 14004, Environmental management systems - General guidelines on principles, systems and Technical Standards Program Document Status as of 12/31/95 Documents Recently Published The Technical Standards Program is sponsoring a project at OSTI to place all DOE technical standards (i.e., standards and handbooks) on the Internet. To date, 57 DOE technical standards have been placed on the Internet at the following address: http://apollo.osti.gov/ html/techstds/ techstds.html The following DOE technical standards have recently

294

Action Sheet 36 Final Report  

SciTech Connect

Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

Kips, R E; Kristo, M J; Hutcheon, I D

2012-02-24T23:59:59.000Z

295

Comparing Double String Theory Actions  

E-Print Network (OSTI)

Aimed to a deeper comprehension of a manifestly T-dual invariant formulation of string theory, in this paper a detailed comparison between the non-covariant action proposed by Tseytlin and the covariant one proposed by Hull is done. These are obtained by making both the string coordinates and their duals explicitly appear, on the same foot, in the world-sheet action, so "doubling" the string coordinates along the compact dimensions. After a discussion of the nature of the constraints in both the models and the relative quantization, it results that the string coordinates and their duals behave like "non-commuting" phase space type coordinates but their expressions in terms of Fourier modes generate the oscillator algebra of the standard bosonic string formulation. A proof of the equivalence of the two formulations is given. Furthermore, open-string solutions are also discussed.

Luca De Angelis; S. J. Gabriele Gionti; Raffaele Marotta; Franco Pezzella

2013-12-27T23:59:59.000Z

296

Canada Calls for Triclosan Action  

Science Journals Connector (OSTI)

Canada Calls for Triclosan Action ... The Canadian government is urging industry to voluntarily remove the antibacterial chemical triclosan from consumer products because of concerns about its toxicity to aquatic organisms. ... Although triclosan can still be sold and used in Canada in products such as antibacterial soaps, toothpastes, and deodorants, the government plans to work with companies over the next 18 months to better understand usage patterns and to assess alternatives. ...

BRITT ERICKSON

2012-04-09T23:59:59.000Z

297

Take the Energy Action Challenge  

K-12 Energy Lesson Plans and Activities Web site (EERE)

Students will work in pairs or small groups to apply knowledge of energy-wise habits to evaluate energy use in their homes and schools and make recommendations for improved efficiency. They will use an energy audit tool to collect data on their home and school energy habits and present an action plan to their class. Further communication at the school and district level is encouraged.

298

Spherical Pendulum, Actions, and Spin  

Science Journals Connector (OSTI)

To fill this gap, our research group has worked out energy surfaces in action variable representation, for a number of classical problems:? the Euler, Lagrange, and Kovalevskaya cases of rigid body dynamics,8-10 billiards in ellipsoids,11,12 and particle motion around point masses with Schwarzschild or Kerr metric as well as around two fixed centers. ... These tori are mirror images of each other under the spin transformation P. ...

Peter H. Richter; Holger R. Dullin; Holger Waalkens; Jan Wiersig

1996-12-05T23:59:59.000Z

299

Riverland expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

300

Replace V-Belts with Notched or Synchronous Belt Drives  

Energy.gov (U.S. Department of Energy (DOE))

Belt drives provide flexibility in the positioning of the motor relative to the load. Pulleys (sheaves) of varying diameters allow the speed of the driven equipment to be increased or decreased relative to the motor speed. A properly designed belt power-transmission system offers high efficiency and low noise, requires no lubrication, and presents low maintenance requirements. However, certain types of belts are more efficient than others, offering potential energy cost savings. This tip sheet provides example energy savings calculations and offers suggested actions.

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Boston Massachusetts: Solar in Action (Brochure), Solar America Cities, Energy Efficiency &...

302

VA Energy Management Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

303

Dynamo action in flows with  

E-Print Network (OSTI)

Dynamo action in flows with cat's eyes A l i c e C o u r v o i s i e r A n d r e w G i l b e r t Y of k for R = 500 and the flow (2.4) and (2.5). nts k = 2.5 and k = 5 are highlighted. Magnetic field). In (a) k = 2.5 and we have 0.5 max Bz (with max Bz 0.6 max |B|), and in (b) k = 5 and the levels .65 max

Li, Yi

304

Numerical Tests of the Improved Fermilab Action  

E-Print Network (OSTI)

Recently, the Fermilab heavy-quark action was extended to include dimension-six and -seven operators in order to reduce the discretization errors. In this talk, we present results of the first numerical simulations with this action (the OK action), where we study the masses of the quarkonium and heavy-light systems. We calculate combinations of masses designed to test improvement and compare results obtained with the OK action to their counterparts obtained with the clover action. Our preliminary results show a clear improvement.

C. Detar; A. S. Kronfeld; M. B. Oktay

2010-11-23T23:59:59.000Z

305

EIS-0397: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...

306

EA-1912: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Mitigation Action Plan EA-1912: Mitigation Action Plan Midway-Benton No. 1 Rebuild Project, neartown of Desert Aire, Benton County, Washington This Mitigation Action Plan (MAP)...

307

Corrective Action Tracking System (CATS) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Tracking System (CATS) Corrective Action Tracking System (CATS) The CATS web-based database is used to enter, track, and report the status of corrective actions...

308

EA-1891: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1891: Mitigation Action Plan Alvey-Fairview Transmission Line Rebuild Project, Oregon This Mitigation Action Plan (MAP) is part of the Finding of No...

309

E-Print Network 3.0 - ankle replacement star Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

star Search Powered by Explorit Topic List Advanced Search Sample search results for: ankle replacement star Page: << < 1 2 3 4 5 > >> 1 BOSTON UNIVERSITY COLLEGE OF ENGINEERING...

310

E-Print Network 3.0 - arthroplasty replacement finger Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

Mechanical Engineering and Bioengineering Summary: . "Conventional and Cross-linked Polyethylene Properties," L. Pruitt, in Total Knee Arthroplasty: A Guide... Replacements and...

311

E-Print Network 3.0 - arthroplasty replacement knee Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

The BioMotion Foundation P... - eration in osteoarthritic knees and damage of polyethylene knee prostheses after total knee replacement... , before and after total knee ......

312

Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR  

Energy.gov (U.S. Department of Energy (DOE))

Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR webcast.

313

E-Print Network 3.0 - authority refrigerator replacement Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

Summary: generally replacing their old refrigerator with a larger capacity unit. Rising energy prices and heightened... -95d DEVELOPMENT OF A HIGH EFFICIENCY,...

314

Five-year cost-utility analysis of acute renal replacement therapy: a societal perspective  

Science Journals Connector (OSTI)

Assessment of the cost utility (CU) of acute renal replacement therapy (RRT) from a societal perspective during a 5-year follow-up.

Annika Laukkanen; Linda Emaus; Ville Pettil

2013-03-01T23:59:59.000Z

315

Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)  

SciTech Connect

This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

McBride, K.C.; Russell, V.K.

1994-10-04T23:59:59.000Z

316

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal  

E-Print Network (OSTI)

). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

317

Part 3: Removal Action | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Removal Action 3: Removal Action Part 3: Removal Action Question: When may removal actions be initiated? Answer: Removal actions may be initiated when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to health or the environment. The NCP specifies that the determination that a risk to health or the environment is appropriate for removal action should be based on: actual or potential exposure of humans, animals, or the food chain the presence of contained hazardous substances that pose a threat of release the threat of migration of the hazardous substances the threat of fire or explosion the availability of an appropriate Federal or State response capability [section 300.415(b)(2)]. In essence, where DOE identifies a threat of exposure to or migration of

318

Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.

DOE /NV

1998-12-08T23:59:59.000Z

319

DOE Standards Actions, November 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Projects Canceled DOE Projects Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Worker Protection for Uranium Facilities, Project Number SAFT-0058; Peter O’Connell, EH-52; 301-903-5641, Peter .O’Connell@eh.doe.gov. This project was superceded by Guide of Good Practices for Oc- cupational Radiological Protec- tion in Uranium Facilities, Project Number SAFT-0072. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with copies for comment. The full text of these documents are available on the Technical Standards Pro- gram (TSP) Web Site at the URL shown at the bottom of this page.

320

EM International Program Action Table  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 E M I n t e r n a t i o n a l P r o g r a m s Page 1 ACTION TABLE Subject Lead Office Engaging Country Meeting Location Purpose Status Date of Event 3 rd US/German Workshop on Salt Repository Research, Design and Operations N. Buschman, EM-22 Germany Albuquerque & Carlsbad, NM Continue collaboration with Germans on salt repository research, design and operations. Draft agenda prepared. October 8-12, 2012 International Framework for Nuclear Energy Cooperation (IFNEC) Ministerial R. Elmetti, EM- 2.1 Multilateral Marrakech, Morocco To support the development of nuclear energy infrastructure globally through workforce training, information sharing, and approaches related to the safe, secure and responsible use of

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The Standards Actions, August 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

standard project was recently can- standard project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Guidelines for Preparing Criti- cality Safety Evaluations at De- partment of Energy Non-Reac- tor Nuclear Facilities, Project Number SAFT-0069; Jerry McKamy, EH-34, 301-903-8031, Jerry. McKamy@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Tritium Handling and Safe Storage, Project Number SAFT-0054;

322

The Standards Action - April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Canceled Projects Canceled The following DOE technical standard project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Seismic Design and Evaluation Guidelines for High-Level Waste Storage Tanks, 6910-0035; Owen Thompson, EM-38, 301- 903-1926, FAX 301-903-7604, Owen.Thompson@em.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Internet Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Stabilization, Packaging, and Storage of Plutonium-Bearing

323

The Standards Actions February 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Technical Standards Program Document Status as of 1/31/96 In Preparation 5 7 Out for Comment 2 1 Total in process = 78 Published in Past 30 Days 0 In Conversion 2 3 Projects Initiated The following DOE technical standards projects were recently initiated. If you are interested in participating in the development of these standards, please contact the persons listed below. * Handbook for the Department of Energy Laboratory Accreditation Program for Radiobioassay, Project No. SAFT-0049; Robert Loesch, EH-52; 301-903- 4443, Email, loesch@viper.eh.doe.gov. * Guide to Good Practices for Training and Qualification of Instructors, Project No. 6910-0051; Ken L Maier, EH-31; 208-526- 9178, FAX 208-526-9650, Email, klm4@inel.gov. * Guide to Good Practices for Training and Qualification of

324

Memorandum: Emergency Actions and NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2005 8, 2005 MEMORANDUM FOR FEDERAL NEPA CONTACTS FROM: HORST G. GRECZMIEL Associate Director for NEPA Oversight SUBJECT: Emergency Actions and NEPA This memorandum provides: * General information on the response to Katrina * Reporting oil and chemical spills * Projected long term recovery efforts * How agencies can respond to emergencies and comply with NEPA. Please distribute this memorandum to your agency planning and environmental personnel. General information on the response to Katrina: Information is available on the FEMA website at http://www.fema.gov and specifics on the government's response are provided at the "What Government is Doing" link which can be directly accessed at http://www.dhs.gov/dhspublic/interapp/editorial/editorial_0712.xml

325

The Standards Actions, February 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

standards project was recently can- standards project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Software Quality Assurance Requirements, Procedures, and Guidelines, Project QCIC-0008; Burton Rothleder, EH-31, 301- 903-3726, FAX 301-903-9523, Burton.Rothleder@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of these documents is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on these documents, please notify your TSM. • DOE Handbook Design Considerations, Project Number EDCN-0001; Richard Stark, EH-31; 301-903-4407, FAX 301-

326

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4  

E-Print Network (OSTI)

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4 Revised: 12/10/2012 OMB Control No. 0648-0272 Expiration Date: 11/30/2015 APPLICATION FOR REPLACEMENT OF CERTIFICATES Person ID: 3. Business Mailing Address: [ ] Permanent or [ ] Temporary 4. Date of Birth or Date

327

Dynamics Visual Servo Control System for the Electric Buses Battery Replacement Robot Following the Target  

Science Journals Connector (OSTI)

This paper designs a robotic system based on dynamics visual servo control system for the electric buses battery replacement robot following the target in order to meet the development of the domestic electric car and to adapt to changes in the height ... Keywords: battery replacement robot, following the target, multi-axis motion control technology, dynamics visual servo, PID control

Qi Hui; Tan Lin

2012-04-01T23:59:59.000Z

328

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc  

E-Print Network (OSTI)

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc Complete Policy Title: Duplicate and Replacement Parchments, Diplomas and Certificates Procedures Policy Number (if applicable): Approved by: Senate Date of Most Recent Approval: March 14, 2007

Haykin, Simon

329

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions  

E-Print Network (OSTI)

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions Romain grains were replaced by chrysotile and brucite under high alkaline conditions. In our study, olivine at the interface between olivine and chrysotile­brucite minerals. Coupled dissolution­precipitation led

Montes-Hernandez, German

330

Energy Policy 29 (2001) 11331143 Ethanol as a lead replacement: phasing out leaded gasoline in Africa  

E-Print Network (OSTI)

Energy Policy 29 (2001) 1133­1143 Ethanol as a lead replacement: phasing out leaded gasoline cost of lead additives and of gasoline, and the falling cost of ethanol and sugarcane, have created sugarcane is produced in Africa to replace all the lead used in African gasoline; this would require Africa

Thomas, Valerie

331

Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network  

E-Print Network (OSTI)

Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network Wenzhong Li City University of Hong Kong Kowloon, Hong Kong Email: wenzhong@cityu.edu.hk Edward Chan City dynamically. Most existing cache strategies perform replacement independently, and they seldom consider

Chan, Edward

332

Energy-efficient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc  

E-Print Network (OSTI)

Energy-efficient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network Edward Chan a, ,Wenzhong Li a,b ,Daoxu Chen b aCity University of Hong Kong, Kowloon, Hong Kong b. Most existing cache strategies perform replacement independently, and they seldom consider coordinated

Chan, Edward

333

Mercury Thermometer Replacement Alternatives Thermometer Description Non-Mercury Non-Mercury Non-Mercury  

E-Print Network (OSTI)

Mercury Thermometer Replacement Alternatives Length Thermometer Description Non-Mercury Non-Mercury Non-Mercury Range / Division VWR-Enviro-Safe® Fisherbrand® Brooklyn Thermometer Company Inc. Total/A #12;Mercury Thermometer Replacement Alternatives Length Thermometer Description Non-Mercury Non

334

Lawrence Berkeley Laboratory Affirmative Action Program. Revised  

SciTech Connect

The Lawrence Berkeley Laboratory`s Affirmative Action Program (AAP) serves as a working document that describes current policies, practices, and results in the area of affirmative action. It represents the Laboratory`s framework for an affirmative approach to increasing the representation of people of color and women in segments of our work force where they have been underrepresented and taking action to increase the employment of persons with disabilities and special disabled and Vietnam era veterans. The AAP describes the hierarchy of responsibility for Laboratory affirmative action, the mechanisms that exist for full Laboratory participation in the AAP, the policies and procedures governing recruitment at all levels, the Laboratory`s plan for monitoring, reporting, and evaluating affirmative action progress, and a description of special affirmative action programs and plans the Laboratory has used and will use in its efforts to increase the representation and retention of groups historically underrepresented in our work force.

NONE

1995-06-01T23:59:59.000Z

335

GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells |  

Open Energy Info (EERE)

GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-f - Water Well NOI for Replacement or Additional Wells 19-WA-f - Water Well NOI for Replacement or Additional Wells.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 90.44.100 Revised Code of Washington 18.104.048 Washington Administrative Code 173-160-151 Triggers None specified A developer seeking to use ground water for an activity may need to drill a new well in a different location than a previous well, drill an additional well at an existing location, or drill a replacement well at the same

336

Drafty Windows: Is it Better to Insulate or Replace Them? | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drafty Windows: Is it Better to Insulate or Replace Them? Drafty Windows: Is it Better to Insulate or Replace Them? Drafty Windows: Is it Better to Insulate or Replace Them? February 9, 2010 - 8:45am Addthis Andrea Spikes Communicator at DOE's National Renewable Energy Laboratory I've lived in my condominium for several years, and though it naturally stays cooler in the summer (with all west-facing windows) I struggle to keep it warm in the winter without taking out a loan to pay utilities. Like any homeowner, I must answer the question: Is it better to try and insulate my existing window, or am I better off replacing it? Sometimes the answer is purely about upfront costs, but other times the inefficiency more than justifies the cost of replacement. There are several ways to make windows more efficient: The least expensive

337

EA-1793: Replacement Capability for Disposal of Remote-handled Low-level  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

793: Replacement Capability for Disposal of Remote-handled 793: Replacement Capability for Disposal of Remote-handled Low-level Waste Generated at the Department of Energy's Idaho Site EA-1793: Replacement Capability for Disposal of Remote-handled Low-level Waste Generated at the Department of Energy's Idaho Site Summary This EA evaluates the environmental impacts of replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017. Public Comment Opportunities Submit Comments to: Mr. Chuck Ljungberg 1955 Fremont Avenue, Mailstop 1216 Idaho Falls, ID 83415 Electronic mail: rhllwea@id.doe.gov Documents Available for Download December 21, 2011 EA-1793: Finding of No Significant Impact Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive

338

A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes  

SciTech Connect

This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

Not Available

1994-02-01T23:59:59.000Z

339

Action Codes Table | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Action Codes Table | National Nuclear Security Administration Action Codes Table | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Action Codes Table Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Code Tables > Action Codes Table

340

Proposed Changes to Emergency Action Levels  

E-Print Network (OSTI)

Reference (a) provided proposed changes to Vermont Yankee's (VY's) Emergency Action Levels (EALs). This letter provides additional information requested by USNRC staff during a telecon held on

Vermont Yankee; Gautam Sen; Richard J. Conte; Emergency Preparedness; Safeguards Branch; Division Of Reactor

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Chapter 4 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

need for the project and achieve the project's purposes (see Section 1.3, Purposes). BPA developed four action alternatives from combinations of the route segments and...

342

California Climate Action Registry | Open Energy Information  

Open Energy Info (EERE)

Place: Los Angeles, California Zip: 90014 Product: Los Angeles-based NPO which develops GHG reporting standards and tools for organisations. References: California Climate Action...

343

Energy Action Month | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and water that can help you meet critical agency mission goals, see Federal Energy and Water Management Awards to read about model Federal projects. During Energy Action Month...

344

Recessive and Dominant Gene Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Recessive and Dominant Gene Action Recessive and Dominant Gene Action Name: Katie Location: N/A Country: N/A Date: N/A Question: What Causes some genes to be ressesive and other genes to be dominant? Replies: Think about the fact that genes code for directions for making proteins. There are many different kinds of proteins in our body-enzymes for regulating metabolism, structural proteins for building our bodies, hormones for regulating processes etc. If the gene for the protein is structural, then it is important to have the right kind and the right amount. If the gene is defective (usually recessive genes are defective, but not always) the right protein will not be made and the structure will either be defective and won't work at all or there won't be enough to maintain the structure. Sometimes you need both genes to be working to get enough of the structure. So a homozygous person will have the strongest structure. A heterozygote would have one gene that is working a may produce enough of the protein to maintain the structure, but maybe not. So in some cases, just having one copy of the dominant (working) gene is enough. If it is a trait for something like eye color, this is not going to cause a defect, just a difference. In this case, being heterozygous or homozgyous for the dominant trait produces the same color of eye. In the case of sickle cell anemia, the recessive gene changes the protein structure of the shape of the red blood cell. If you have one good copy and one bad copy of the gene, some of your cells will be normal and some will be sickle cells. One good copy of the gene gives you enough normal red blood cells to stay healthy. But if you don't have a normal copy, all of your cells have the capability to sickle under certain conditions and this can be fatal. So think of dominant and recessive genes in terms of what they produce and what that protein is supposed to do and then think of what would happen if the dominant gene was able to overtake the effect of the recessive gene.

345

Robotic actions in the human brain Robotic movement preferentially engages the action observation network  

E-Print Network (OSTI)

Robotic actions in the human brain 1 Robotic movement., Stadler, W. & Prinz, W. (in press / 2011). Robotic movement preferentially engages the action observation network. Human Brain Mapping. #12;Robotic

Hamilton, Antonia

346

March 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2007 March 2007 Continued on next page TSP Manager's Notes 1 Domestic Programs (American National Standards) Overview 2 Aerospace Industry Advocates Standards Selection Based on Technical Merit, Not Semantics 3 Report Recommends Withdrawal of OMB Risk Assessment Bulletin 4 Technical Standards Manager Spotlight 5 Topical Committee Developments 6 Welcome Aboard the TSMC! 7 Standards Actions 8 DOE Standards Actions 8

347

December 2006 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2006 December 2006 TSP Manager's Notes 1 Meeting In The Middle 2 Plain Talk for a New Generation 3 Licensing New Nuclear Power Plants 4 ANSI Government Affairs Overview 5 Technical Standards Manager Spotlight 7 Topical Committee Developments 8 Welcome Aboard the TSMC! 8 Standards Actions 9 DOE Standards Actions 9

348

Group actions on twin buildings Peter Abramenko  

E-Print Network (OSTI)

Group actions on twin buildings Peter Abramenko Introduction Though parts of the present paper sense) for the action of G(k[t, t-1 ]) on the product + � - of the two associated Bruhat�Tits buildings 4 also yielded a preliminary version of Lemma 2 involving both affine buildings + and -. Thus I

Chapman, Robin

349

Open government partnership: Argentina action plan  

Science Journals Connector (OSTI)

In 2009, Iberoamerican countries signed the Charter of Citizen Participation in Public Administration. Well in advance in 2003, the Argentinean Government issued a decree ensuring freedom of information. Based on such decree and fulfilling the commitments ... Keywords: argentina action plan, government action plan, open government, public policies

Pedro Janices; Natalia Aguerre

2013-10-01T23:59:59.000Z

350

Proof of the Impossibility of a Classical Action Principle for Magnetic Monopoles and Charges without Subsidiary Conditions  

Science Journals Connector (OSTI)

A proof is given that no action principle exists for the classical electromagnetic field when its sources are both charged particles and magnetic monopoles unless an extra condition, not derivable from the action principle, is assumed. The extra condition is that charges never touch magnetic monopoles. The Lorentz force law predicts that a charge and a magnetic monopole approaching each other along a straight line will collide. Since the Lorentz force law can only be gotten from an action principle with the aid of this extra condition, the necessary extra condition is in contradiction to the law derived with its help. Thus there is no satisfactory action principle for the classical electromagnetic field if both charges and magnetic monopoles exist. The foregoing provides an aesthetic argument against the existence of magnetic monopoles. An action principle has then been constructed using the extra condition. It is analogous to the usual action principle for (charge-only) electromagnetic theory, but J?A? is replaced by J?R??K?T? where J? and K? are the 4-dimensional current and magnetic monopole densities, respectively, and R? and T? are gaugeless "effective potentials." Electromagnetic theory is formulated in a gaugeless way in terms of these effective potentials in the Appendix.

David Rosenbaum

1966-07-29T23:59:59.000Z

351

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

Tracker Tracker Jump to: navigation, search Tool Summary Name: Climate Action Tracker Agency/Company /Organization: Ecofys Sector: Climate Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual Website: www.climateactiontracker.org/ Climate Action Tracker Screenshot References: Climate Action Tracker[1] "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The website provides an up-to-date assessment of individual national pledges to reduce their greenhouse gas emissions. In the framework of the UNFCCC, many countries have put proposals on the table about how much they intend to reduce their greenhouse-gas emissions in both the near and the long term.

352

Climate Protection Action Fund | Open Energy Information  

Open Energy Info (EERE)

Action Fund Action Fund (Redirected from The Climate Protection Action Fund) Jump to: navigation, search Logo: The Climate Protection Action Fund Name The Climate Protection Action Fund Address 901 E Street, NW Suite 610 Place Washington, District of Columbia Zip 20004 Website http://www.climateprotectionac Coordinates 38.896398°, -77.024192° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.896398,"lon":-77.024192,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

353

Energy Action Month | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Outreach » Energy Action Month Services » Outreach » Energy Action Month Energy Action Month October 7, 2013 - 4:43pm Addthis The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote energy- and water-saving practices in Federal facilities. This year's outreach materials call on Federal employees to take action and empower leadership, innovation, and excellence to realize a secure energy future. Empower Leadership One individual can empower collaboration and teamwork that can spark change and result in sustainable solutions. Empower coworkers, groups, and entire organizations to lead by example, build momentum, and make a difference. Empower Innovation Innovative thinking can guide strategic sustainability plans, generate new best practices, and accelerate the deployment of clean energy technologies.

354

BWR In-Core Monitor Housing Replacement Under Dry Condition of Reactor Pressure Vessel  

SciTech Connect

A new method of In-Core Monitor Housing replacement has been successfully applied to Tokai Unit 2 (BWR with 1100 MWe) in April of 2001. It was designed to replace a housing under dry condition of reactor pressure vessel (RPV): this enabled the elimination of water filled-up and drained processes during the replacement procedure resulting in the reduction of implementation schedule. To realize the dry condition, the radiation shields were placed in the RPV and the hollow guide pipe (GP) was adopted to transfer the apparatuses from the top to the bottom work area. (authors)

Tatsuo Ishida; Shoji Yamamoto; Fujitoshi Eguchi [Japan Atomic Power Company (Japan); Motomasa Fuse; Kouichi Kurosawa; Sadato Shimizu; Minoru Masuda [Hitachi Ltd. (Japan); Shinya Fujii; Junji Tanaka [General Electric International Inc. (Japan); Jacobson, Bryce A. [General Electric Company (United States)

2002-07-01T23:59:59.000Z

355

Corrective Action Decision Document for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Decision Document has been prepared for the Nevada Test Site's Area 23 Mercury Fire Training Pit (Corrective Action Unit 342) in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996). Corrective Action Unit 342 is comprised of Corrective Action Site 23-56-01. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for Corrective Action Unit 342. The scope of this document consists of the following: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for the Corrective Action Unit.

DOE /NV

1999-05-26T23:59:59.000Z

356

Application of a PDMS microstencil as a replaceable insulator toward a single-use planar microelectrode array  

Science Journals Connector (OSTI)

Here we present a novel idea for a replaceable insulator, and thus advance toward the goal of a single-use planar microelectrode array (MEA) for the study of electrogenic tissues. The concept of a replaceable ...

Yoonkey Nam; Katherine Musick; Bruce C. Wheeler

2006-12-01T23:59:59.000Z

357

Ligand placement based on prior structures: the guided ligand-replacement method  

Science Journals Connector (OSTI)

A new module, Guided Ligand Replacement (GLR), has been developed in Phenix to increase the ease and success rate of ligand placement when prior protein-ligand complexes are available.

Klei, H.E.

2013-12-25T23:59:59.000Z

358

Transparent and Conductive Carbon Nanotube Multilayer Thin Films Suitable as an Indium Tin Oxide Replacement  

E-Print Network (OSTI)

Transparent electrodes made from metal oxides suffer from poor flexibility and durability. Highly transparent and electrically conductive thin films based on carbon nanotubes (CNTs) were assembled as a potential indium tin oxide (ITO) replacement...

Park, Yong Tae

2012-07-16T23:59:59.000Z

359

The welfare gain from replacing the health insurance tax exclusion with lump-sum tax credits  

Science Journals Connector (OSTI)

This paper analyzes the welfare gain from replacing the tax exclusion of employer-provided health insurance with a lump-sum tax credit. It differs from earlier studies in that ... look at the welfare cost of heal...

Liqun Liu; Andrew J. Rettenmaier

2011-06-01T23:59:59.000Z

360

Functions and Requirements and Specifications for Replacement of the Computer Automated Surveillance System (CASS)  

SciTech Connect

This functions, requirements and specifications document defines the baseline requirements and criteria for the design, purchase, fabrication, construction, installation, and operation of the system to replace the Computer Automated Surveillance System (CASS) alarm monitoring.

SCAIEF, C.C.

1999-12-16T23:59:59.000Z

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 93 Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy National Nuclear Security Administration August 2007 Final Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject - August 2007 i TABLE OF CONTENTS List of Acronyms and Abbreviations............................................................................................. vi Chemicals and Units of Measure ................................................................................................. ix Conversion Chart ......................................................................................................................... xi Metric Prefixes .............................................................................................................................xii

362

Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)  

SciTech Connect

Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

Not Available

2014-09-01T23:59:59.000Z

363

Climate Action Plan (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Michigan) Climate Action Plan (Michigan) Climate Action Plan (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Michigan Program Type Climate Policies Provider Michigan Department of Environmental Quality On November 14, 2007, Governor Jennifer M. Granholm issued Executive Order

364

Rem&al Action Performed  

Office of Legacy Management (LM)

Rem&al Action Performed Rem&al Action Performed at the B&T Metals Site in * Columbus, Ohio Department of Energy Office of Assistant Manager for Environmenta/ Management Oak Ridge Operations June 2007 Printed on recycled/recyclable paper. 1.41 2503.2 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PER-FORMED AT THE B&T METALS SITE IN COLUMBUS, OHIO JUNE 200 1 Prepared for United States Department of Energy Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 B&TFinal 6/2001 CONTENTS FIGURES ..................................................................................................................................................... iv ACRON-YhiS ...............................................................................................................................................

365

Climate Action Plan (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Minnesota) Climate Action Plan (Minnesota) Climate Action Plan (Minnesota) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Climate Policies Provider MN Deparment of Commerce Recognizing the implications that global climate change may have on the

366

Climate Action Plan (Pennsylvania) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Pennsylvania Program Type Climate Policies Provider Department of Environmental Protection The Office of Pollution Prevention and Energy Assistance works with

367

Climate Action Plan (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Montana) Climate Action Plan (Montana) Climate Action Plan (Montana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Montana Program Type Climate Policies Provider Department of Environmental Quality Recognizing the profound implications that global warming and climate variation could have on the economy, environment and quality of life in Montana, the Climate Change Advisory Committee (CCAC) was established with

368

Climate Action Plan (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Wisconsin) Climate Action Plan (Wisconsin) Climate Action Plan (Wisconsin) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Climate Policies Provider University of Wisconsin In April 2007, Governor Doyle signed Executive Order 191 which brought

369

Abstract--Replacing open-heart surgical procedures with beating-heart interventions substantially decreases the trauma  

E-Print Network (OSTI)

Abstract-- Replacing open-heart surgical procedures with beating-heart interventions substantially on the beating heart is valve repair. To address this need, this paper proposes a tool for replacing mitral valve replacement and reduction of regurgitation was demonstrated in an ex-vivo heart simulator. I. INTRODUCTION UE

Dupont, Pierre

370

Climate Protection Action Fund | Open Energy Information  

Open Energy Info (EERE)

Action Fund Action Fund Jump to: navigation, search Logo: The Climate Protection Action Fund Name The Climate Protection Action Fund Address 901 E Street, NW Suite 610 Place Washington, District of Columbia Zip 20004 Website http://www.climateprotectionac Coordinates 38.896398°, -77.024192° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.896398,"lon":-77.024192,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

371

July/August 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions Standards Actions U.S. Department of Energy Office of Nuclear Safety, Quality Assurance and Environment July/August 2008 Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/techstds/) 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.hss.energy.gov/nuclearsafety/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved

372

President Obama Announces His Climate Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Monday, July 1, 2013 On Tuesday, June 25, in a speech at Georgetown University, President Obama announced his comprehensive plan for steady, responsible action to cut carbon pollution, prepare the Nation for the impacts of climate change, and lead international efforts to address climate change as a global challenge. The Plan builds on significant progress made during the Administration's first term on all of these fronts, including those based on the ongoing scientific work of USGCRP's 13 member-agencies, the Interagency Climate Change Adaptation Task Force in which USGCRP participates, and USGCRP's National Climate Assessment team.

373

National Energy Action Month | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Energy Action Month National Energy Action Month National Energy Action Month October 5, 2012 - 12:24pm Addthis Learn about the President's all-of-the-above energy plan. Matt Compton Deputy Director of Online Content for the Office of Digital Strategy at the White House. Editor's note: This article has been cross-posted from WhiteHouse.gov. October is National Energy Action Month, when Americans are called up to work together, "to achieve greater energy security, a more robust economy, and a healthier environment for our children" -- as President Obama wrote in an official proclamation on Monday. Those goals are the reason that the President is pursuing an all-of-the-above strategy to help the United States achieve energy independence. To give you a better sense of what that means, we've put together a video

374

ACTION SPECTRUM OF THE "SECOND EMERSON EFFECT"  

E-Print Network (OSTI)

at 670 mju in the action spectrum of the "second Emerson effect"' (22, 33), in the green alga Chlorella the fraction of total absorbed light absorbed by the accessory pigments (be it chlorophyll b in Chlorella

Govindjee

375

Bishop's University Energy Efficiency Action Plan  

E-Print Network (OSTI)

. Continuous basis Action 9: Sustainable Development standards for existing buildings. Go green certification from BOMA for existing buildings Bishop's University Sustainable Development policy (ELU Committee January 2008 Government of Quebec, energy strategy, May 2006 Sustainable Development law, 2006 Letter

376

University at Buffalo Climate Action Plan  

E-Print Network (OSTI)

........................................................................................ 2-5 2.3 Opportunities for Improving UB's GHG Inventory......................................... 2-9 2.4 The Impact of Campus Growth on UB's GHG Footprint.............................. 2-11 3 Actions-7 A APPENDICES................................................................................1 A. UB's GHG

Oh, Kwang W.

377

Antiseptics and Disinfectants: Activity, Action, and Resistance  

Science Journals Connector (OSTI)

...mechanism of action and risk assessment. . Fitzgerald K. A. Davies...resistance to preservative systems . Gilbert P. Barber J. Ford...biocides. . Russell, A. D. Assessment of sporicidal activity. Int...indicators for low temperature steam and formaldehyde sterilization...

Gerald McDonnell; A. Denver Russell

1999-01-01T23:59:59.000Z

378

The University of Connecticut Climate Action Plan  

E-Print Network (OSTI)

The University of Connecticut Climate Action Plan: Guiding the Path toward Carbon Neutrality Storrs ................................................................................................................................143 Cover Photo: University of Connecticut President, Susan Herbst, reaffirms UConn's commitment; Susan Herbst, University of Connecticut President; Gene Likens, Distinguished Visiting Faculty

Holsinger, Kent

379

Assessment of Remedial Actions for Contaminated Sites  

Science Journals Connector (OSTI)

During the investigation in the field of remedial actions on contaminated land, an appropriate concept ... site, an evaluation of the existing alternative remedial techniques is necessary. The comparative evaluat...

Th. Neteler; H. L. Jessberger

1993-01-01T23:59:59.000Z

380

EA-1562-SA-1: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington (Mitigation Action Plan for Phase II Build Out, North Federal Campus, PNNL Site)

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

BS.l Actions to Conserve Energy-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BS.l Actions to Conserve Energy- BS.l Actions to Conserve Energy- Revision 0 Sitewide Categorical Exclusion for Actions to Conserve Energy Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office L11tegrated Management System Procedure, NEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

382

Replacement Capability for Disposal of Remote-Handled Low-Level Waste Generated at the Department of Energys Idaho Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FINDING OF NO SIGNIFICANT IMPACT FOR THE ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT CAPABILITY FOR THE DISOPOSAL OF REMOTE-HANDLED LOW-LEVEL RADIOACTIVE WASTE GENERATED AT THE DEPARTMENT OF ENERGY'S IDAHO SITE Agency: U. S. Department of Energy (DOE) Action: Finding ofNo Significant Impact (FONSI) Summary: Operations conducted in support ofIdaho National Laboratory (INL) and Naval Reactors Facility (NRF) missions on the Idaho site generate low-level radioactive waste (LL W). DOE classifies some of the LL W generated at the INL as remote-handled LL W because its potential radiation dose is high enough to require additional protection of workers using distance and shielding. Remote-handled wastes are those with radiation levels exceeding 200 millirem

383

December 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Standards Forum & Standards Actions Page 1 December 2007 The Standards Forum & Standards Actions Page 1 December 2007 Continued on next page Technical Standards Program Manager's Note 1 Teaching Standards Development- Inspiring the Next Generation 2 The EPA Radiation Standard for Spent-Fuel Storage in a Geological Repository 3 Expanded Access to Hydrogen Codes and Standards 4 Really Following the Building Code 6 Technical Standards Manager Spotlight 7

384

FACT SHEET: INTERNATIONAL SMART GRID ACTION NETWORK  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updated on July 23, 2010 Updated on July 23, 2010 1 FACT SHEET: INTERNATIONAL SMART GRID ACTION NETWORK At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers launched an International Smart Grid Action Network (ISGAN) to accelerate the development and deployment of smart electricity grids around the world. Smart grid will help the world accelerate its transition to clean energy and capture the associated energy- and

385

Universality and ambiguity in fermionic effective actions  

E-Print Network (OSTI)

We discuss an ambiguity in the one-loop effective action of massive fields which takes place in massive fermionic theories. The universality of logarithmic UV divergences in different space-time dimensions leads to the non-universality of the finite part of effective action, which can be called the non-local multiplicative anomaly. The general criteria of existence of this phenomena are formulated and applied to fermionic operators with different external fields.

Guilherme de Berredo-Peixoto; Dante D. Pereira; Ilya L. Shapiro

2012-01-12T23:59:59.000Z

386

Action and Inaction Levels in Pest Management.  

E-Print Network (OSTI)

~AMPHIB THIS MATERIAL MAY NOT BE REMOVED FROl\\11 ,THE LIBRARY Action & Inaction Levels in Pest Management THE TEXAS AGRICULTURAL EXPERIMENT STATION I Nevil le P. Clarke I The Texas A&M University System I ColleQe Station, Texas B-1480 July... 1984 Action and Inaction Levels in Pest Management Winfield Sterling Department of Entomology Texas A&M University and The Texas Agricultural Experiment Station College Station, Texas 77843 Contents Introduction...

Sterling, Winfield

1984-01-01T23:59:59.000Z

387

Talk, No Action On Nuclear Waste Plan  

Science Journals Connector (OSTI)

Talk, No Action On Nuclear Waste Plan ... Nowhere was how an exasperated Lt. Gen. Brent Scowcroft, chairman of the Blue Ribbon Commission on Americas Nuclear Future, described the status of the U.S.s search for a place to store spent commercial nuclear fuel and other radioactive waste. ... Although the blue-ribbon commission had completed its seminal report on nuclear waste in January, Scowcroft noted that action on its recommendations was nowhere. ...

JEFF JOHNSON

2012-09-30T23:59:59.000Z

388

DOE Action Plan Addressing the Electricity Distribution System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION PLAN ACTION PLAN ADDRESSING THE ELECTRICITY DISTRIBUTION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Distribution System 1 Table of Contents INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ................................................................................................ 2 Focus on Distribution .............................................................................................. 3 Roadmap Goals ....................................................................................................... 3 PROCESS OVERVIEW ........................................................................................................... 4

389

EIS-0473: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EIS-0473: Mitigation Action Plan W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This Mitigation Action Plan (MAP)...

390

United States-Japan Joint Nuclear Energy Action Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States-Japan Joint Nuclear Energy Action Plan United States-Japan Joint Nuclear Energy Action Plan An outline on the United States and Japan's joint nuclear energy action...

391

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement  

SciTech Connect

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnels capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NEs long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

Noel Duckwitz

2011-05-01T23:59:59.000Z

392

Enforcement actions: Significant actions resolved; Quarterly progress report, October--December 1993: Volume 12, No. 4  

SciTech Connect

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1994-03-01T23:59:59.000Z

393

US - Brazil Binational Energy Working Group Joint Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US - Brazil Binational Energy Working Group Joint Action Plan US - Brazil Binational Energy Working Group Joint Action Plan brazilactionplan7202010.pdf More Documents &...

394

San Diego, California: Solar in Action (Brochure), Solar America...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Diego, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Diego, California: Solar in Action (Brochure), Solar...

395

San Francisco, California: Solar in Action (Brochure), Solar...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure),...

396

Portland, Oregon: Solar in Action (Brochure), Solar America Cities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency...

397

Transition of Long-Term Response Action Management Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transition of Long-Term Response Action Management Requirements Transition of Long-Term Response Action Management Requirements The purpose of this memorandum is to provide you...

398

Urgent Action on Energy Conservation Standards for Residential...  

Energy Savers (EERE)

Urgent Action on Energy Conservation Standards for Residential Water Heaters (Docket Number: EERE-2012-BT-STD-0022) Urgent Action on Energy Conservation Standards for Residential...

399

Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America...  

Energy Savers (EERE)

Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America...

400

Denver, Colorado: Solar in Action (Brochure), Solar America Cities...  

Energy Savers (EERE)

Denver, Colorado: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Denver, Colorado: Solar in Action (Brochure), Solar America Cities,...

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Policy and Procedures for the Review of Federal Actions Impacting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy and Procedures for the Review of Federal Actions Impacting the Environment Policy and Procedures for the Review of Federal Actions Impacting the Environment This manual...

402

President Obama Announces Commitments and Executive Actions to...  

NLE Websites -- All DOE Office Websites (Extended Search)

Obama Announces Commitments and Executive Actions to Advance Solar Deployment and Energy Efficiency President Obama Announces Commitments and Executive Actions to Advance Solar...

403

Burundi-National Adaptation Plan of Action to Climate Change...  

Open Energy Info (EERE)

Burundi-National Adaptation Plan of Action to Climate Change Jump to: navigation, search Name Burundi-National Adaptation Plan of Action to Climate Change AgencyCompany...

404

Ethiopia-Climate Change National Adaptation Programme of Action...  

Open Energy Info (EERE)

Action Jump to: navigation, search Name Ethiopia-Climate Change National Adaptation Programme of Action AgencyCompany Organization United Nations Development Programme, Global...

405

Demand Response and Smart Metering Policy Actions Since the Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Demand Response and Smart Metering Policy Actions Since the...

406

National Action Plan on Demand Response | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Action Plan on Demand Response National Action Plan on Demand Response Presentation-given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008...

407

2005 CHP Action Agenda: Innovating, Advocating, and Delivering...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 CHP Action Agenda: Innovating, Advocating, and Delivering Solutions, October 2005 2005 CHP Action Agenda: Innovating, Advocating, and Delivering Solutions, October 2005 More than...

408

State Opportunities for Action: Update of States' CHP Activities...  

Energy Savers (EERE)

State Opportunities for Action: Update of States' CHP Activities (ACEEE), October 2003 State Opportunities for Action: Update of States' CHP Activities (ACEEE), October 2003 This...

409

Berkeley, California: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Berkeley, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Berkeley, California: Solar in Action (Brochure), Solar America...

410

Tucson, Arizona: Solar in Action (Brochure), Solar America Cities...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Tucson, Arizona: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Tucson, Arizona: Solar in Action (Brochure), Solar America Cities,...

411

Austin, Texas: Solar in Action (Brochure), Solar America Cities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Austin, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Austin, Texas: Solar in Action (Brochure), Solar America Cities, Energy...

412

Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar America...  

Energy Savers (EERE)

Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar...

413

Seattle, Washington: Solar in Action (Brochure), Solar America...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seattle, Washington: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Seattle, Washington: Solar in Action (Brochure), Solar America...

414

Knoxville, Tennessee: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Knoxville, Tennessee: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Knoxville, Tennessee: Solar in Action (Brochure), Solar America...

415

POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for...  

Energy Savers (EERE)

15 Processing Personnel Actions for Details POLICY GUIDANCE MEMORANDUM 15 Processing Personnel Actions for Details The Office of Personnel Management (OPM), effective September...

416

2012 National Energy Assurance Planning Conference After-Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29,...

417

Boston Massachusetts: Solar in Action (Brochure), Solar America...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boston Massachusetts: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Boston Massachusetts: Solar in Action (Brochure), Solar America...

418

Energy Department Actions to Deploy Combined Heat and Power,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency October 21, 2013 -...

419

Tonopah Test Range Environmental Restoration Corrective Action Sites  

SciTech Connect

This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites and Corrective Action Units at the Tonopah Test Range

NSTec Environmental Restoration

2010-08-04T23:59:59.000Z

420

Two Tribes Recognized as Climate Action Champions During White...  

Office of Environmental Management (EM)

Two Tribes Recognized as Climate Action Champions During White House Tribal Nations Conference Two Tribes Recognized as Climate Action Champions During White House Tribal Nations...

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EIS-0389: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0389: Mitigation Action Plan Trinity Public Utilities District Direct Interconnection Project Western Area Power Administration (Western) proposes to...

422

EAC Recommendations for DOE Action Regarding Consumer Acceptance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6,...

423

SEE Action Series: Local Strategies for Whole-Building Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Action Network (SEE Action), facilitated by the U.S. Department of EnergyU.S. Environmental Protection Agency. Content does not imply an endorsement by...

424

SEE Action Series: Energy Performance Benchmarking and Disclosure...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Action Network (SEE Action), facilitated by the U.S. Department of EnergyU.S. Environmental Protection Agency. Content does not imply an endorsement by...

425

EIS-0026: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0026: Mitigation Action Plan Waste Isolation Pilot Plant This MAP focuses on mitigation commitments stated in the RODs to the 1980 Final Environmental...

426

United States and Japan Sign Joint Nuclear Energy Action Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy...

427

United States -Japan Joint Nuclear Energy Action Plan | Department...  

Energy Savers (EERE)

United States -Japan Joint Nuclear Energy Action Plan United States -Japan Joint Nuclear Energy Action Plan President Bush of the United States and Prime Minister Koizumi of Japan...

428

Transcript of See Action and Technical Assistance Program Webcast...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transcript of See Action and Technical Assistance Program Webcast: Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Transcript of See Action and...

429

Corrective Action Tracking System User's Guide | Department of...  

Office of Environmental Management (EM)

September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP)...

430

Stimulating Energy Efficiency Action in States | Department of...  

Energy Savers (EERE)

Stimulating Energy Efficiency Action in States Stimulating Energy Efficiency Action in States During Fiscal Years 2010-2013, the U.S. Department of Energy's (DOE) State Energy...

431

Energy Department Officials Kick Off National Energy Action Month...  

Energy Savers (EERE)

Energy Department Officials Kick Off National Energy Action Month Energy Department Officials Kick Off National Energy Action Month October 3, 2014 - 1:30am Addthis Energy...

432

Energy Literacy in Action: Nevada Teachers Helping Students Learn...  

Office of Environmental Management (EM)

Literacy in Action: Nevada Teachers Helping Students Learn About Energy Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy November 6, 2014 - 10:48am...

433

Implement an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from...

434

Develop an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine...

435

EA-1595: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor...

436

EIS-0422: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

437

San Antonio, Texas: Solar in Action (Brochure), Solar America...  

Energy Savers (EERE)

San Antonio, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Antonio, Texas: Solar in Action (Brochure), Solar America...

438

E-Print Network 3.0 - actions significant actions Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

should begin work on its Action Team Plan. ... Source: Environmental Protection Agency, Technology Innovation Program (TIP) Collection: Multidisciplinary Databases and Resources...

439

Guidance Regarding Actions That May Proceed During the NEPA Process:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions That May Proceed During the NEPA Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions. Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions More Documents & Publications NEPA and NHPA: A Handbook for Integrating NEPA and Section 106 Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to

440

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

NREL: Biomass Research - Marine Corps Taps NREL to Help Replace Aging Steam  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

442

Study: Algae Could Replace 17% of U.S. Oil Imports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Study: Algae Could Replace 17% of U.S. Oil Imports Study: Algae Could Replace 17% of U.S. Oil Imports Study: Algae Could Replace 17% of U.S. Oil Imports April 13, 2011 - 6:30pm Addthis Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL Staff Photographer Dennis Schroeder. Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL Staff Photographer Dennis Schroeder. Niketa Kumar Niketa Kumar Public Affairs Specialist, Office of Public Affairs Every day, the United States spends about $1 billion to import foreign oil, money that we could be investing in American energy and the American economy. President Obama recently announced an ambitious but achievable

443

The How's and Why's of Replacing the Whole Barrel | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The How's and Why's of Replacing the Whole Barrel The How's and Why's of Replacing the Whole Barrel The How's and Why's of Replacing the Whole Barrel October 19, 2011 - 4:09pm Addthis A 42-U.S. gallon barrel of crude oil yields about 45 gallons of petroleum products. Source: Energy Information Administration, “Oil: Crude Oil and Petroleum Products Explained” and Annual Energy Outlook 2009 (Updated February 2010). A 42-U.S. gallon barrel of crude oil yields about 45 gallons of petroleum products. Source: Energy Information Administration, "Oil: Crude Oil and Petroleum Products Explained" and Annual Energy Outlook 2009 (Updated February 2010). Paul Bryan Biomass Program Manager, Office of Energy Efficiency & Renewable Energy For many, a barrel of oil is almost synonymous with its most prominent

444

NREL: Technology Transfer - Marine Corps Taps NREL to Help Replace Aging  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

445

NREL: Technology Deployment - Marine Corps Taps NREL to Help Replace Aging  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

446

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions  

Science Journals Connector (OSTI)

Olivine mineral replacement by serpentine is one major alteration reaction of oceanic hydrothermalism. In the present experimental study, olivine grains were replaced by chrysotile and brucite under high alkaline conditions. In our study, olivine replacement implied a spatial and temporal coupling of dissolution and precipitation reactions at the interface between olivine and chrysotilebrucite minerals. Coupled dissolutionprecipitation led to the alteration of starting olivine grains (so-called primary or parent mineral) to a porous mineral assemblage of chrysotile and brucite with preservation of the initial olivine morphology. This mineral replacement reaction of olivine (serpentinization) has been characterized using XRD, FESEM and FTIR measurements. Moreover, a simple and novel method is here proposed to quantify the mineral replacement rate (or serpentinization rate) of olivine using thermogravimetric (TG) and differential TG (DTG) analyses. Serpentinization extent depends on the grain size: it is complete after 30 days of reaction for the smallest olivine grains (<30?m), after 90 days of reaction for the intermediate olivine grains (30?m56?m). For the largest fraction (56150?m), 55% of serpentinization extent was reached after 90 days. Based on the fitting of the serpentinization extent (?t) versus time (t) using a kinetic pseudo-second-order model, the serpentinization rates vary from 3.610?6s?1 to 1.410?7s?1 depending on the olivine grain size. An additional correlation between FTIR spectra analysis and TG measurements is proposed. The mineral replacement reactions frequently observed in natural alteration processes could be a powerful synthesis route to design new porous and/or nanostructured materials.

Romain Lafay; German Montes-Hernandez; Emilie Janots; Rodica Chiriac; Nathaniel Findling; Francois Toche

2012-01-01T23:59:59.000Z

447

The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radioactive Liquid Waste Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory OAS-L-13-15 September 2013 Department of Energy Washington, DC 20585 September 26, 2013 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR ACQUISITION AND PROJECT MANAGEMENT MANAGER LOS ALAMOS FIELD OFFICE FROM: David Sedillo Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory" BACKGROUND The Department of Energy's Los Alamos National Laboratory (Los Alamos) is a Government- owned, contractor operated Laboratory that is part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex. Los Alamos' primary responsibility is to

448

Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana  

E-Print Network (OSTI)

+ Generator. This ECM is basically the same as ECM $7, except that in lieu of the new 500 ton enginedriven chiller, replacement would be 1 absorption chiller supplied with waste heat from a generator. $2.030.560 Project Budget $235,13 1 Annual Savings... + Generator. This ECM is basically the same as ECM $7, except that in lieu of the new 500 ton enginedriven chiller, replacement would be 1 absorption chiller supplied with waste heat from a generator. $2.030.560 Project Budget $235,13 1 Annual Savings...

Poche', J. M.; Broussard, J. P.

1998-01-01T23:59:59.000Z

449

Climate Action Planning Tool Formulas and Assumptions  

NLE Websites -- All DOE Office Websites (Extended Search)

CLIMATE ACTION PLANNING TOOL FORMULAS AND ASSUMPTIONS Climate Action Planning Tool Formulas and Assumptions The Climate Action Planning Tool calculations use the following formulas and assumptions to generate the business-as-usual scenario and the greenhouse gas emissions reduction goals for the technology options. Business-as-Usual Scenario All Scope 1 (gas, oil, coal, fleet, and electricity) and Scope 2 calculations increase at a rate equal to the building growth rate. Scope 3 calculations (commuters and business travel) increase at a rate equal to the population growth rate. Assumptions New buildings will consume energy at the same rate (energy use intensity) as existing campus buildings. Fleet operations will be proportional to total building area.

450

Animal Care Enforcement Actions | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Animal Care Enforcement Actions Animal Care Enforcement Actions Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Animal Care Enforcement Actions Dataset Summary Description Contains monthly reports on 7060s and stipulations related to enforcement of the Animal Welfare and Horse Protection Acts. Form 7060 - Official warning of an alleged violation of statue or regulation and notice to the subject that APHIS may seek civil or criminal penalties for alleged violation in the future if the subject again violates. Stipulation - a pre-litigation monetary settlement between APHIS and the subject. The stipulation provides the subject with notice of alleged violation, affords the subject an opportunity for an administrative hearing, and offers the subject an opportunity to waive the hearing and pay a monetary penalty calculated within Civil Penalty guidelines.

451

Environmental Effects Abroad of Major Federal Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44-NO. 62 44-NO. 62 3-29-79 PAGES 18633-18921 E THURSDAY, MARCH 29, 1979 € 18722 NOTICES [ 31 25-01-MI COUNCIL ON ENVIRONMENTAL QUALITY 'ENVIRONMENTAL EFFECTS ABROAD OF MAJOR FEDERAL ACTIONS Executive Order 12144; Implementing and Explanotory Documents MARCH 21, 1979. AGENCY: Council on Environmental Quality, Executive Office of t h e F'resi- dent. ACTION: Information Only: Publica- tion of Implementing Documents Con- cerning Executive Order 12114. SUMMARY: O n January 4, 1979, t h e President signed Executive Order 12114, Environmental Effects Abroad of Major Federal Actions (44 FR 1957 (Jan. 9, 1979)). The Council has re- ceived numerous requests for t h e im- plementing and explanatory docu- ments. I n order efficiently to respond to such public requests. t

452

Climate Action Plan (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maryland) Maryland) Climate Action Plan (Maryland) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative State/Provincial Govt Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Climate Policies Provider Maryland Department of Natural Resources On April 20, 2007, Governor Martin O'Malley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to address the causes

453

Climate Action Plan (Kentucky) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kentucky) Kentucky) Climate Action Plan (Kentucky) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Kentucky Program Type Climate Policies Provider Kentucky Department for Energy Development and Independence The Commonwealth of Kentucky established the Kentucky Climate Action Plan

454

Climate Action Plan (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maine) Maine) Climate Action Plan (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maine Program Type Climate Policies Provider Department of Environmental Protection In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan

455

Affirmative Action and Higher Education in Brazil  

Science Journals Connector (OSTI)

This article examines the impact of affirmative action in Brazil. Since 2003, some public universities have adopted a quota system for students from public schools, blacks (blacks and mestizos), indigenous people, poor ones, and people with special disability needs. This approach investigates the implementation of a quota system in the Federal University of Bahia. Bahia is the state with the highest percentage of black people in Brazil. The article analyzes the performance of students who were admitted by the quota system during 2 years. It also suggests that affirmative action must be understood in different contexts, principally in relation to other countries such as the United States and India.

J.T. dos Santos; D.M. Queiroz

2010-01-01T23:59:59.000Z

456

The Standards Forum and Standards Actions - June 2001 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 Inside this issue: Should DOE Organizations Include DOE O 252.1 in their Contracts?....................................................... 1 Metrology/Accreditation Personnel and Nuclear Weapons Complex Managers Take Action Addressing Current Issues at Joint Annual Meeting........................................................................ 1 A Note from the Manager........................................................................................................................ 2 Welcome Aboard the TSMC!..................................................................................................................

457

Action plan for the Tiger Team assessment report  

SciTech Connect

This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

Not Available

1990-08-30T23:59:59.000Z

458

Journal of Biomechanics 38 (2005) 305314 Computational wear prediction of a total knee replacement  

E-Print Network (OSTI)

Journal of Biomechanics 38 (2005) 305­314 Computational wear prediction of a total knee replacement from in vivo kinematics Benjamin J. Freglya,b,c, *, W. Gregory Sawyera , Melinda K. Harmand , Scott A 32611, USA b Department of Biomedical Engineering, University of Florida, Gainesville, FL, USA c

Sawyer, Wallace

459

Modeling of residual service life of gas turbine rotors for minimizing replacement costs  

Science Journals Connector (OSTI)

One of the most catastrophic failures observed in gas turbine powered electrical powerplants is the fracture of the turbine rotor. A simplified model consisting of 3 macro-elements is suggested to model the dynamical behavior of the shaft with a propagating ... Keywords: crack propagation, gas-turbine, modeling, power-plant, replacement costs

Eusebia Zouridaki; Vasilios Spitas; Christos Spitas

2007-01-01T23:59:59.000Z

460

Mercury Replacement Program It is the policy of California State University, Fullerton to remove mercury containing  

E-Print Network (OSTI)

Mercury Replacement Program I. Policy It is the policy of California State University, Fullerton to remove mercury containing devices throughout campus, insofar as is reasonably possible, and provide, the University has an obligation to safeguard employees from the potential health effects of mercury vapor while

de Lijser, Peter

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

462

Exploring Aggregate Effect with Weighted Transcoding Graphs for Efficient Cache Replacement in Transcoding Proxies  

E-Print Network (OSTI)

Exploring Aggregate Effect with Weighted Transcoding Graphs for Efficient Cache Replacement University Taipei, Taiwan, ROC E-mail: {cychang@arbor.ee.ntu.edu.tw; mschen@cc.ee.ntu.edu.tw} Abstract This paper explores the aggregate effect when caching multiple versions of the same Web object

Chen, Ming-Syan

463

Toroidal field coil replacement study for the International Thermonuclear Experimental Reactor (ITER)  

SciTech Connect

The objective of this study is to develop an estimate of the time required to replace a failed toroidal field (TF) coil in the International Thermonuclear Experimental Reactor (ITER). This estimate is based on the current ITER design which resulted from the Conceptual Design Activities began in spring of 1988 and ending in December 1990. Although the TF Coils in ITER are designated permanent components and expected to last the life of the plant, the history of failures of large coils in fusion devices has prompted an assessment of the down time that might be required for replacement of a failed TF coil in ITER. The difficulty of replacement of a TF Coil in ITER is compounded by the large physical size of ITER, and the radiation fields which necessitate the use of remote handling equipment for most maintenance activities. Since 10 out of 16 TF coils are adjacent to either a Neutral Beam Injector (NBI) port or a remote handling (RH) port, it is probable that a failed TF Coil will be in one of these inconvenient locations. For this study, TF coil number 3 is assumed to fail and its replacement will be evaluated as a typical case. TF coil number 3 is located between a remote handling port ({number sign}3) and a port allocated to the lower hybrid ({number sign}4).

Not Available

1991-08-01T23:59:59.000Z

464

Toroidal field coil replacement study for the International Thermonuclear Experimental Reactor (ITER)  

SciTech Connect

The objective of this study is to develop an estimate of the time required to replace a failed toroidal field (TF) coil in the International Thermonuclear Experimental Reactor (ITER). This estimate is based on the current ITER design which resulted from the Conceptual Design Activities began in spring of 1988 and ending in December 1990. Although the TF Coils in ITER are designated permanent components and expected to last the life of the plant, the history of failures of large coils in fusion devices has prompted an assessment of the down time that might be required for replacement of a failed TF coil in ITER. The difficulty of replacement of a TF Coil in ITER is compounded by the large physical size of ITER, and the radiation fields which necessitate the use of remote handling equipment for most maintenance activities. Since 10 out of 16 TF coils are adjacent to either a Neutral Beam Injector (NBI) port or a remote handling (RH) port, it is probable that a failed TF Coil will be in one of these inconvenient locations. For this study, TF coil number 3 is assumed to fail and its replacement will be evaluated as a typical case. TF coil number 3 is located between a remote handling port ({number_sign}3) and a port allocated to the lower hybrid ({number_sign}4).

Not Available

1991-08-01T23:59:59.000Z

465

TriopusNet: Automating Wireless Sensor Network Deployment and Replacement in Pipeline Monitoring  

E-Print Network (OSTI)

TriopusNet: Automating Wireless Sensor Network Deployment and Replacement in Pipeline Monitoring sensor net- work system for autonomous sensor deployment in pipeline monitoring. TriopusNet works by automatically releasing sensor nodes from a centralized repository located at the source of the water pipeline

Chu, Hao-hua

466

Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet data  

E-Print Network (OSTI)

1 Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet and a hybrid bus. Employing real-world bus fleet data from King County Metro (Washington State, USA) multiple multiple fleets of buses with different types of buses serving different routes. For example, King County

Bertini, Robert L.

467

GREEN LIVING Replace incandencent and halogen light bulbs with LED and CLFs  

E-Print Network (OSTI)

GREEN LIVING GUIDE ENERGY TRAVEL FOOD sustain yosef WATER Replace incandencent and halogen light POWER STRIPS! for you electronics, and turn them off when not in use Adjust your thermostat UP IN SUMMER Bicycle Initiative http://boonebikeinitiative.org LEAVE YOUR CAR AT HOME - save $ on a parking pass

Thaxton, Christopher S.

468

Can electricity from the human body replace batteries? by Anne-Marie Bullock for BBC News  

E-Print Network (OSTI)

Harnessing energy from the human body may only generate small amounts of electricity but scientists believeCan electricity from the human body replace batteries? by Anne-Marie Bullock for BBC News it has a wide range of potentially life-changing applications. Imagine clothes made with materials

South Bohemia, University of

469

Inorganic nitrogen availability after severe stand-replacing fire in the Greater  

E-Print Network (OSTI)

and Watershed Stewardship, Colorado State University, Fort Collins, CO 80526 This contribution is part) Understanding ecosystem processes as they relate to wildfire and vegetation dynamics is of growing importance of severe, stand-replacing wildfires are poorly understood. We studied inorganic nitrogen pools

Turner, Monica G.

470

The effects of adrenalectomy and corticosterone replacement on maternal memory in postpartum rats  

E-Print Network (OSTI)

The effects of adrenalectomy and corticosterone replacement on maternal memory in postpartum rats M prime rats to behave maternally, although hormonal changes are not necessary for these behaviors with corticosterone or vehicle pellets being given to adrenalectomized rats. Pups were removed immediately following

Sokolowski, Marla

471

Model for laser action in vibronic systems  

Science Journals Connector (OSTI)

The theory of laser action in solid-state systems is reconsidered with emphasis on the role of the interaction between lasing impurity states and lattice vibrations. The influence of a strong electron-phonon coupling on threshold conditions and field dynamics is presented, taking into account the vibronic-level structure, and compared with the usual four-level scheme.

P. Schwendimann; E. Sigmund; K. Zeile

1988-04-15T23:59:59.000Z

472

NASA Retrospective Plan Progress PENDING ACTIONS  

E-Print Network (OSTI)

Page | 1 NASA Retrospective Plan Progress May 2012 PENDING ACTIONS Agency/Subagency RIN /OMB) Progress updates and anticipated accomplishments Notes 1. NASA/Procurement AD60 NASA Grant and Cooperative Agreement: Change Procedures for Letter of Credit Advance Payments This rule revises the NASA Grant

Waliser, Duane E.

473

Ethics in Action: A Conference on  

E-Print Network (OSTI)

Ethics in Action: A Conference on Corporate Social Responsibility Reflecting on the past and inventing the future ETHICAL LEADERSHIP 2 013 CONFERENCE Presented by Rutgers Institute for Ethical Leadership at the Newark Museum April 19, 2013 #12;Mission: We strengthen ethical leadership to enhance civil

Lin, Xiaodong

474

ACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised)  

E-Print Network (OSTI)

with the President, Director & Associate Director. Review current communications plan for Executive and BoardACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised) GOAL Foster pride and participation informed MAA Board Investigate an increase in number of Executive Committee meetings with standard agenda

Thompson, Michael

475

Nordic H2 Energy Foresight Action Report  

E-Print Network (OSTI)

Innovation Centre Nordic Energy Research Cover : Pages: 48 Tables: References: Abstract (max. 2000 charNordic H2 Energy Foresight Action Report Annele Eerola Nordic Hydrogen Energy Foresight www.h2foresight.info Risø National Laboratory November 2004 #12;Author: Annele Eerola Title: Nordic H2 Energy

476

FTCP Corrective Action Plan- Revision 1  

Energy.gov (U.S. Department of Energy (DOE))

January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

477

FTCP Corrective Action Plan- Revision 2  

Energy.gov (U.S. Department of Energy (DOE))

March 2009 FTCP Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations

478

Science Maps in Action Dr. Katy Brner  

E-Print Network (OSTI)

Science Maps in Action Dr. Katy B�rner Cyberinfrastructure for Network Science Center, Director Information Visualization Laboratory, Director School of Library and Information Science Indiana University Computational Scientometrics: Studying Science by Scientific Means B�rner, Katy, Chen, Chaomei, and Boyack

Menczer, Filippo

479

Duo-action electro thermal micro gripper  

Science Journals Connector (OSTI)

A thermally actuated micro gripper with two integrated micro actuators for open/close action was designed and fabricated from single crystal silicon. A total gripping range of 13@mm was observed for driving voltages below 5V. The actuation efficiency ... Keywords: Micro actuator, Micro assembly, Micro gripper, Micro manipulation

B. E. Volland; K. Ivanova; Tzv. Ivanov; Y. Sarov; E. Guliyev; A. Persaud; J. -P. Zllner; S. Klett; I. Kostic; I. W. Rangelow

2007-05-01T23:59:59.000Z

480

Princeton University Outdoor Action Sustainability Guide  

E-Print Network (OSTI)

Princeton University Outdoor Action Sustainability Guide #12;Over the past thirty-five years students in the outdoors and how to facilitate team building and positive group interaction. In addition Itinerary ·Defining sustainability ·Princeton's Sustainability Plan ·Focus: fresh water and climate change

Note: This page contains sample records for the topic "action replace spacer" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Companies agree on climate-change actions  

Science Journals Connector (OSTI)

Companies agree on climate-change actions ... Believing that "for proactive leaders there are major business opportunities in meeting the climate challenge, if the policy environment is right," British Petroleum, General Motors, and Monsanto have joined with the World Resources Institutea Washington, D.C.-based center for environmental policy research-in a broad scheme to reduce greenhouse gas emissions. ...

DAVID HANSON

1998-11-02T23:59:59.000Z

482

Categorical Exclusion Determination Form Proposed Action Title: (0472-1518) Case Western Reserve University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18) Case Western Reserve University - 18) Case Western Reserve University - Transformation Enabled Nitride Magnets Absent Rare Earths Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Cleveland, OH Proposed Action Description: Funding will support the development of iron nitride (a"-Fe16(xx)N2) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Case Western Reserve University's application was selected for an initial 18- month period (Phase 1) of funding . The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

483

Categorical Exclusion Determination Form Proposed Action Title: (0472-1545) Dartmouth College -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45) Dartmouth College - 45) Dartmouth College - Nanocrystalline T-MnAI Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Hanover, NH Proposed Action Description: Funding will support the development of manganese-aluminum (T-MnAI) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Dartmouth College's application was selected for an initial 18- month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional H3-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

484

Purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies of great cormorant (Phalacrocorax carbo) haemoglobin  

Science Journals Connector (OSTI)

The great cormorant hemoglobin has been isolated, purified and crystallized and the three dimensional structure is solved using molecular replacement technique.

Jagadeesan, G.

2014-10-25T23:59:59.000Z

485

Sleep Disruptions Mediate the Relationship Between Early Postoperative Pain and Later Functioning Following Total Knee Replacement Surgery  

Science Journals Connector (OSTI)

Despite relatively standardized surgical procedures, patients undergoing total knee replacement (TKR) surgery differ dramatically in the speed of their recovery. Previous research has suggested a relationship ...

Julie K. Cremeans-Smith; Kendra Millington; Eve Sledjeski

2006-04-01T23:59:59.000Z

486

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada  

Office of Legacy Management (LM)

Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada Controlled Copy No.: Revision No.: 3 March 2006 Approved for public release; further dissemination unlimited. DOE/NV--1025--Rev. 3 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062

487

Building Technologies Office: Take Action to Save Energy in Commercial  

NLE Websites -- All DOE Office Websites (Extended Search)

Take Action to Save Take Action to Save Energy in Commercial Buildings to someone by E-mail Share Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Facebook Tweet about Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Twitter Bookmark Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Google Bookmark Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Delicious Rank Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Digg Find More places to share Building Technologies Office: Take Action to Save Energy in Commercial Buildings on AddThis.com... About Take Action to Save Energy Manage Organizational Energy Use Design & Construct New Buildings

488

GARS DSOC Open Action Items -9/19/13 Status Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Open Action Items -9/19/13 Status Open Action Items -9/19/13 Status Action ID # Dept Type of Concern Issue Action Owner Status Originator Priority 46 DA Security/ Operations The use of Entrust is a vital component of cyber security. The team recommends that a solution to funding the startup and enduring cost be evaluated by the GARS Business office and BNL Cyber Security. Expand and encourage greater usage of Entrust across all categories of sensitive information and employees. 8/6 - Gerry sent a message to T. Schlagel 8/24/12-Testing alt approach. ITD /GARS in communication. 10/5 - G. Stokes to contact T. Schlagel 10/12 - T. Schlagel updated Gerry on progress using Entrust for BNL using the Argonne Solution 10/26 - Solution for system is in process 11/9 - K. McIntyre and K. Gillen on Entrust. Working thru

489

The SUN Action database : collecting and analyzing typical actions for visual scene types  

E-Print Network (OSTI)

Recent work in human and machine vision has increasingly focused on the problem of scene recognition. Scene types are largely defined by the actions one might typically do there: an office is a place someone would typically ...

Olsson, Catherine Anne White

2013-01-01T23:59:59.000Z

490

LEDSGP/Transportation Toolkit/Key Actions | Open Energy Information  

Open Energy Info (EERE)

Actions Actions < LEDSGP‎ | Transportation Toolkit Jump to: navigation, search LEDSGP Logo.png Transportation Toolkit Home Tools Training Contacts Key Actions for Low-Emission Development in Transportation Although no single approach or fixed process exists for low-emission development strategies (LEDS), the following key actions are necessary steps for implementing LEDS in the transportation sector. Undertaking these actions requires flexibility to adapt to dynamic societal conditions in a way that complements existing climate and development goals in other sectors. Planners, researchers, and decision-makers should customize this LEDS implementation framework for the specific conditions of their transport sector, choosing from relevant resources to achieve a comprehensive action

491

Corrective Action Investigation Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, with Errata Sheet, Revision 0  

SciTech Connect

Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: 03-04-02, Area 3 Subdock Septic Tank 03-59-05, Area 3 Subdock Cesspool 12-59-01, Drilling/Welding Shop Septic Tanks 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.

Alfred Wickline

2007-01-01T23:59:59.000Z

492

Hiring Reform Memoranda and Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0585 0585 October 7, 2010 MEMORANDUM FOR HEADS OF ALL DEPARTMENTAL ELEMEI\lTS HUMAI\l RESOURCES DIRECTORS FROM: MICHAELC. KANE~~~ CHIEF HUMAN CAPITAL ~ c· SUBJECT: IMPROVING DOE RECRUITMENT AND HIRING PROCESSES This is a follow-up to the Deputy Secretary's Memorandum dated October 6, 2010 where he communicated the need to implement the Action Plan developed to improve the recruitment and hiring processes throughout the Department. One of the central tenets of the President's reform efforts and the Department's Action Plan is management's commitment and attention to an efficient and effective hiring process that yields quality employees. This was clearly articulated in the President's Memorandum dated May 11, 2010 where he directed that management be held accountable through the performance evaluation system for their role

493

Climate Action Planning Tool | Open Energy Information  

Open Energy Info (EERE)

Planning Tool Planning Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate Action Planning Tool Agency/Company /Organization: National Renewable Energy Laboratory Sector: Climate, Energy Focus Area: Renewable Energy, Buildings, Energy Efficiency, Greenhouse Gas, Industry, - Industrial Processes, People and Policy, Transportation Phase: Prepare a Plan, Develop Finance and Implement Projects Resource Type: Guide/manual, Online calculator User Interface: Website Website: www.nrel.gov/applying_technologies/planning_tool/ Web Application Link: www.nrel.gov/applying_technologies/planning_tool/gather_data.cfm Cost: Free Overview This tool is a step by step calculator to find the impact of various technologies to an overall action plan. The target of the tool is research

494

SNS Returns to Action | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Spallation Neutron Source returns to action Spallation Neutron Source returns to action Knoxville New Sentinel - January 09, 2013 The Spallation Neutron Source, after rocky times this fall due to back-to-back target vessel failures and a two-week shutdown during the holidays, is up and running again, and there are plans to keep it in a production mode through the end of May to make up for lost ground. Operations manager Kevin Jones said the SNS resumed operations for research users at about 8 a.m. on Tuesday. "SNS is operating at the planned power level of 850 kW to preserve target lifetime until a second spare target is available," Jones said in an email message. "All user program instruments are taking beam for experiments and we look forward to a productive long run through May 30, 2013," he said. "During

495

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

David Kathan, Ph.D David Kathan, Ph.D Federal Energy Regulatory Commission U.S. DOE Electricity Advisory Committee October 29, 2010 Demand Response as Power System Resources The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission 2 Demand Response * FERC (Order 719) defines demand response as: - A reduction in the consumption of electric energy by customers from their expected consumption in response to an increase in the price of electric energy or to in incentive payments designed to induce lower consumption of electric energy. * The National Action Plan on Demand Response released by FERC staff broadens this definition to include - Consumer actions that can change any part of the load profile of a utility or region, not just the period of peak usage

496

Math/science education action conference report  

SciTech Connect

On October 8--10, 1989, the US Department of Energy, the Lawrence Hall of Science, and the Lawrence Berkeley Laboratory sponsored a Math/Science Education Action Conference in Berkeley, California. The conference was co-chaired by Admiral James D. Watkins, Secretary of Energy, and Dr. Glenn T. Seaborg Chairman of the Lawrence Hall of Science. Nearly 250 scientists, educators, business executives, and government leaders came together to develop a concrete plan of action for restructuring and revitalizing mathematics and science education. Their target was to improve education for an entire cohort of children--the Class of 2007, the children born this school year--and their governing principle was one of collaboration, both between Federal agencies, and between public and private sectors. The report of the conference co-chairmen and participants is provided in this document. 41 figs.

Not Available

1990-05-01T23:59:59.000Z

497

Nationally Appropriate Mitigation Actions | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Nationally Appropriate Mitigation Actions Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Nationally Appropriate Mitigation Actions Agency/Company /Organization: United Nations Framework Convention on Climate Change Sector: Energy, Land Focus Area: Energy Efficiency Topics: GHG inventory, Low emission development planning Resource Type: Publications, Lessons learned/best practices, Case studies/examples Website: unfccc.int/home/items/5265.php Country: Afghanistan, Antigua and Barbuda, Armenia, Benin, Bhutan, Botswana, Brazil, Cameroon, Central African Republic, China, Democratic Republic of Congo, Costa Rica, Ivory Coast, Ethiopia, Eritrea, Gabon, Georgia (country), Ghana, India, Indonesia, Israel, Jordan, Madagascar, Maldives, Marshall Islands, Mauritania, Mexico, Mongolia, Morocco, Papua New Guinea, Peru, South Korea, Moldova, San Marino, Sierra Leone, Singapore, South Africa, Republic of Macedonia, Togo, Tunisia

498

COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer  

E-Print Network (OSTI)

COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer replacement up to $1,300. The funding will be approved only if the faculty member has not purchased a computer with start-up, research, FRAP or other funds (including Computer

Qian, Ning

499

The Effects of Metaphylaxis and Milk Replacer Additives on Health and Growth of Neonatal Holstein Bull Calves.  

E-Print Network (OSTI)

), ceftiofur crystalline free acid (CEF), or saline (CON). All calves received a commercial milk replacer powder (25% CP, 20% fat), and within metaphylaxis treatment, were randomly assigned to receive milk replacer with: 1) 4 g/d for 7 d and then 2 g...

Holloway, Kenton S.

2010-07-14T23:59:59.000Z

500

A Brief Look At Affirmative Action  

E-Print Network (OSTI)

-versed of his legal rights, and does not need further instruction regarding his rights during the interview. If I provide a formal statement of his rights, I receive many comments regarding my disclosure statement and reduced participation from... generation ago- and did not emerge serendipitously" (Shaw 2003). Despite deliberate efforts to address racial inequality, the results have been mixed. In 1961, President John F. Kennedy first introduced the term Affirmative Action as a means...

Erickson, Nancy Jo

2007-12-06T23:59:59.000Z