Powered by Deep Web Technologies
Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Accelerating RCRA corrective action: The principles of the DOE approach  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is involved in the remediation of environmental contamination at many of its facilities under the Resource Conservation and Recovery Act (RCRA). RCRA`s corrective action provisions were established by the Hazardous and Solid Waste Amendments of 1984 (HSWA). In response to the HSWA mandate, EPA established a program for the conduct of RCRA corrective action that was similar to that established under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). In addition, EPA developed and implemented its ``stabilization`` initiative as a means of quickly addressing immediate risks posed by releases until long term solutions can be applied. To improve the efficiency of environmental restoration at its facilities, DOE is developing guidance and training programs on accelerated environmental restoration under RCRA. A RCRA guidance document, entitled ``Accelerating RCRA Corrective Action at DOE Facilities,`` is currently being developed by DOE`s Office of Environmental Policy and Assistance. The new guidance document will outline a decision-making process for determining if acceleration is appropriate for individual facilities, for identifying, evaluating, and selecting options for program acceleration, and for implementing selected acceleration options. The document will also discuss management and planning strategies that provide a firm foundation for accelerating RCRA corrective action. These strategies include a number of very basic principles that have proven effective at DOE and other federal facilities, as well as some new approaches. The purpose of this paper is to introduce DOE`s new guidance document, discuss the general approach presented in the guidance for accelerating RCRA corrective action, and to emphasize some of the more important principles of effective management and planning.

Kimmell, T.A.; Green, D.R.; Ranek, N.L. [Argonne National Lab., IL (United States); Coalgate, J.L. [USDOE, Washington, DC (United States)

1995-03-01T23:59:59.000Z

2

Integration of RCRA corrective action with Clean Water Act compliance  

SciTech Connect (OSTI)

A synthetic fibers manufacturing facility is implementing an integrated phased program to upgrade its existing wastewater treatment plant (WWTP) to comply with both the Clean Water Act and the Resource Conservation and Recovery Act (RCRA). The existing WWTP consists of an influent settling basin, two equalization basins, two aeration basins with low- and high-speed aerators, three secondary clarifiers, post-aeration, and belt filter press dewatering with on-site landfilling. The existing WWTP will be replaced with a tank-based system that will include equalization, biological treatment, clarification, effluent filtration, and effluent diffusion. RCRA regulatory compliance incorporated the Corrective Action Program, the Toxicity Characteristic Rule, the Land Disposal Restrictions, and closure/postclosure requirements. Clean Water Act compliance incorporated the Organic Chemicals, Plastics, and Synthetic Fibers (OCPSF) effluent guidelines, effluent toxicity and general water quality requirements. Logistically, project implementation involved fast-track design and construction, close regulatory interface, and maintenance of production process continuity.

Cable, J.K.; Starlin, L.A.; Giltner, J.A.: Futch, R.S.; Ballard, R.W. (CH2M Hill, Atlanta, GA (United States))

1992-05-01T23:59:59.000Z

3

RCRA Information Brief, June 1996: Conditional remedies under RCRA correction action  

SciTech Connect (OSTI)

This document describes conditional remedies under RCRA corrective action. The definition of conditional remedies, criteria that must be met, applications to DOE facilities, applicable clean-up standards, and implementation of conditional remedies are discussed in the document.

NONE

1996-06-01T23:59:59.000Z

4

EPA - RCRA Orientation Manual 2011: Resource Conservation and...  

Open Energy Info (EERE)

and Recovery Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - RCRA Orientation Manual 2011: Resource Conservation and Recovery Act...

5

RCRA corrective action definitions under Subpart F and proposed Subpart S. RCRA Information Brief  

SciTech Connect (OSTI)

If EPA or the authorized State determines there has been a release of a hazardous waste or hazardous waste constituent at an interim status facility, RCRA Section 3008(h)(1) authorizes EPA or the authorized State to issue an administrative order requiring corrective action or other measures. There are no regulations specifically addressing corrective action orders under Subpart F. However, while an interim status facility is seeking a RCRA permit, the facility is required by 40 CFR 265 Subpart F to monitor ground water and report the results of this monitoring program to the regulatory agency. If a release of a hazardous waste or hazardous waste constituent occurs, the facility may be issued a RCRA Section 3008(h) Order to conduct corrective action. While the proposed Subpart S regulations apply specifically to SWMUs at permitted TSDFs, EPA intends to use similar corrective action requirements at interim status facilities where there has been a release of a hazardous waste or hazardous waste constituent. The specific requirements for corrective action at an interim status facility will be specified in a RCRA Section 3008(h) Order. Alternatively, EPA may compel corrective action under proposed Subpart S through a permit Schedule of Compliance, especially if the permit is expected to be issued in the near term. This information Brief discusses the terminology used in the two corrective action programs and discusses both the proposed Subpart S rule and the final CAMU and TU rule.

Not Available

1994-03-01T23:59:59.000Z

6

Institutional Controls in RCRA & CERCLA Response Actions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EH-413-0004 EH-413-0004 Institutional Controls in RCRA & CERCLA Response Actions August 2000 United States Department of Energy Office of Environmental Policy and Guidance RCRA/CERCLA Division (EH-413) Selecting and Implementing Institutional Controls in RCRA and CERCLA Response Actions at Department of Energy Facilities August 2000 Prepared by U.S. Department of Energy Office of Environmental Policy and Guidance RCRA/CERCLA Division (EH-413) Technical Support by Argonne National Laboratory Project Performance Corporation For Additional Information Contact: John J. Bascietto, EH-413 phone: 202-586-7917 fax: 202-586-3915 john.bascietto@eh.doe.gov Jerry Coalgate, EH-413 phone: 202-586-6075 fax: 202-586-3915 jerry.coalgate@eh.doe.gov Table of Contents Chapter 1 Introduction .

7

A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes  

SciTech Connect (OSTI)

This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

Not Available

1994-02-01T23:59:59.000Z

8

Corrective Action Management Units and Temporary Units. RCRA Information Brief  

SciTech Connect (OSTI)

On February 16, 1993 the EPA published a final rule that allows either the EPA Regional Administrator or the authorized State to designate areas as corrective action management units (CAMUs) at hazardous waste management facilities for the specific purpose of managing remediation waste that has been generated as part of the facility`s corrective action activities. According to the rule, placement of remediation wastes into or within a CAMU does not constitute land disposal of hazardous waste and is not subject to RCRA land disposal restrictions. In addition, waste disposal units located within CAMUs are not required to be designed in accordance with RCRA minimum technological requirements applicable to land disposal units. This Information Brief explains the advantages of a CAMU designation, defines a Temporary Unit (TU) and explains the advantages of a TU designation. The process for initiating a CAMU or TU designation is described for DOE sites and interim status facilities.

Not Available

1994-03-01T23:59:59.000Z

9

Guidance on NEPA Review for Corrective Actions under the Resource  

Broader source: Energy.gov (indexed) [DOE]

NEPA Review for Corrective Actions under the Resource NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

10

Guidance on NEPA Review for Corrective Actions under the Resource  

Broader source: Energy.gov (indexed) [DOE]

Guidance on NEPA Review for Corrective Actions under the Resource Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

11

Guide to ground water remediation at CERCLA response action and RCRA corrective action sites  

SciTech Connect (OSTI)

This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

NONE

1995-10-01T23:59:59.000Z

12

RCRA facility assessments  

SciTech Connect (OSTI)

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

13

Resource Conservation and Recovery Act (RCRA) Closure Plan Summary for Interim reasctive Waste Treatment Area (IRWTA)  

SciTech Connect (OSTI)

This closure plan has been prepared for the interim Reactive Waste Treatment Area (IRWT'A) located at the Y-12 Pkmt in oak Ridge, Tennessee (Environmental Protection Agency [EPA] Identification TN 389-009-0001). The actions required to achieve closure of the IRWTA are outlined in this plan, which is being submitted in accordance with Tennessee Ruie 1200- 1-1 1-.0S(7) and Title 40, Code of Federal Regulations (CFR), Part 265, Subpart G. The IRWTA was used to treat waste sodium and potassium (NaK) that are regulated by the Resource Conservation and Recovery Act (RCRA). The location of the IRWT'A is shown in Figures 1 and 2, and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.

Collins, E.T.

1997-07-01T23:59:59.000Z

14

Guidance on Compliance with the National Environmental Policy Act for Corrective Actions Conducted under the Resource Conservation and Recovery Act  

Broader source: Energy.gov (indexed) [DOE]

K9;07-w) K9;07-w) United State s Governme nt Department of Enerav memorandum DATE: REPLY TO AlT" OF: SUBJECT: TO: December 23, 1997 Office of NEPA Policy and Assistance:Osborne:202-586-4596 Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) NEPA Compliance Officers and Assistant Managers for Environmental Management I am pleased to provide the attached guidance on NEPA review for corrective actions under RCRA. This guidance results from the work of a Task Team formed by Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental

15

RCRA facility stabilization initiative  

SciTech Connect (OSTI)

The RCRA Facility Stabilization Initiative was developed as a means of implementing the Corrective Action Program`s management goals recommended by the RIS for stabilizing actual or imminent releases from solid waste management units that threaten human health and the environment. The overall goal of stabilization is to, as situations warrant, control or abate threats to human health and/or the environment from releases at RCRA facilities, and/or to prevent or minimize the further spread of contamination while long-term remedies are pursued. The Stabilization initiative is a management philosophy and should not be confused with stabilization technologies.

Not Available

1995-02-01T23:59:59.000Z

16

Resource Conservation and Recovery Act (RCRA) closure sumamry for the Uranium Treatment Unit  

SciTech Connect (OSTI)

This closure summary has been prepared for the Uranium Treatment Unit (UTU) located at the Y-12 Plant in Oak Ridge, Tennessee. The actions required to achieve closure of the UTU area are outlined in the Closure Plan, submitted to and approved by the Tennessee Department of Environmental and Conservation staff, respectively. The UTU was used to store and treat waste materials that are regulated by the Resource Conservation and Recovery Act. This closure summary details all steps that were performed to close the UTU in accordance with the approved plan.

NONE

1996-05-01T23:59:59.000Z

17

Compendium of ORD and OSWER documents relevant to RCRA corrective action  

SciTech Connect (OSTI)

Throughout the past decade, several offices within the US Environmental Protection Agency (EPA) have been involved in hazardous waste management technologies research, remedial action at chemically contaminated sites, and regulatory development for permitting hazardous waste management facilities. The primary offices involved in these activities include the Office of Research and Development (ORD) and the Office of Solid Waste and Emergency Response (OSWER). During this period, substantial knowledge and experience have been gained relevant to the a placability of remedial action technologies in various environmental setting

Not Available

1992-04-01T23:59:59.000Z

18

Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant  

SciTech Connect (OSTI)

In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc.

Not Available

1994-05-01T23:59:59.000Z

19

E-Print Network 3.0 - act rcra general Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: Control Technology RCRA* Resource Conservation and Recovery Act RF resuspension factor RHIC Relativistic... , Relevant, and Appropriate Requirements ARPA*...

20

Quarterly RCRA Groundwater Monitoring Data for the Period July through September 2006  

SciTech Connect (OSTI)

This report provides information about RCRA groundwater monitoring for the period July through September 2006. Eighteen Resource Conservation and Recovery Act (RCRA) sites were sampled during the reporting quarter.

Hartman, Mary J.

2007-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

RCRA (Resource Conservation and Recovery Act) ground-water monitoring projects for Hanford facilities: Annual Progress Report for 1989  

SciTech Connect (OSTI)

This report describes the progress during 1989 of 16 Hanford Site ground-water monitoring projects covering 25 hazardous waste facilities and 1 nonhazardous waste facility. Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act of 1976 and the State of Washington Administrative Code. 40 refs., 75 figs., 6 tabs.

Smith, R.M.; Gorst, W.R. (eds.)

1990-03-01T23:59:59.000Z

22

Hanford Facility RCRA permit handbook  

SciTech Connect (OSTI)

Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

NONE

1996-03-01T23:59:59.000Z

23

Management of corrective action wastes pursuant to proposed Subpart S  

SciTech Connect (OSTI)

Under Section 3004(u) of the Resource Conservation and Recovery Act (RCRA), owners/operators of permitted or interim status treatment, storage, and disposal facilities (TSDFs) are required to perform corrective action to address releases of hazardous waste or hazardous constituents from solid waste management units (SWMUs). On July 27, 1990, the Environmental Protection Agency (EPA) proposed specific corrective action requirements under Part 264, Subpart S of Title 40 of the code of Federal Regulations (CFR). One portion of this proposed rule, addressing requirements applicable to corrective action management units (CAMUs) and temporary units (TUs), was finalized on February 16, 1993 (58 FR 8658 et seq.). (CAMUs and TUs are RCRA waste management units that are specifically designated for the management of corrective action wastes). Portions of the proposed Subpart S rule that address processes for the investigation and cleanup of releases to environmental media have not yet been finalized. EPA and authorized State agencies, however, are currently using the investigation and cleanup procedures of the proposed rule as a framework for implementation of RCRA`s corrective action requirements. The performance of corrective action cleanup activities generates wastes that have to be characterized and managed in accordance with applicable RCRA requirements. This Information Brief describes these requirements. It is one of a series of information Briefs on RCRA Corrective Action.

Not Available

1995-02-01T23:59:59.000Z

24

E-Print Network 3.0 - act rcra rcra Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RCRA programs provide interim relief relating to the call-in of RCRA ... Source: Yucca Mountain Project, US EPA Collection: Environmental Sciences and Ecology 2 Contract...

25

EA-0820: Construction of Mixed Waste Storage RCRA Facilities, Buildings  

Broader source: Energy.gov (indexed) [DOE]

0: Construction of Mixed Waste Storage RCRA Facilities, 0: Construction of Mixed Waste Storage RCRA Facilities, Buildings 7668 and 7669, Oak Ridge, Tennessee EA-0820: Construction of Mixed Waste Storage RCRA Facilities, Buildings 7668 and 7669, Oak Ridge, Tennessee SUMMARY This EA evaluates the environmental impacts of a proposal to construct and operate two mixed (both radioactive and hazardous) waste storage facilities (Buildings 7668 and 7669) in accordance with Resource Conservation and Recovery Act requirements. Site preparation and construction activities would take place at the U.S. Department of Energy's Oak Ridge National Laboratory in Oak Ridge, Tennessee. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 16, 1994 EA-0820: Finding of No Significant Impact

26

Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments.

NONE

1997-05-01T23:59:59.000Z

27

Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

NONE

1997-05-01T23:59:59.000Z

28

RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory  

SciTech Connect (OSTI)

US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL`s assessment of the need for further remedial attention.

Not Available

1987-03-01T23:59:59.000Z

29

RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory  

SciTech Connect (OSTI)

US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention.

Not Available

1987-03-01T23:59:59.000Z

30

Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas  

SciTech Connect (OSTI)

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

MCCARTHY, M.M.

1999-08-01T23:59:59.000Z

31

GRR/Section 18-HI-b - RCRA - Hazardous Waste Treatment, Storage, and  

Open Energy Info (EERE)

8-HI-b - RCRA - Hazardous Waste Treatment, Storage, and 8-HI-b - RCRA - Hazardous Waste Treatment, Storage, and Disposal Permit (TSD) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-HI-b - RCRA - Hazardous Waste Treatment, Storage, and Disposal Permit (TSD) 18HIB - RCRAHazardousWasteTreatmentStorageAndDisposalPermitTSD.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Solid and Hazardous Waste Branch United States Environmental Protection Agency Regulations & Policies Resource Conversation and Recovery Act (42 U.S.C. 6901, et seq.) 40 CFR 270 Hawaii Administrative Rules Title 11, Chapter 261 Hawaii Administrative Rules Title 11, Chapter 265 Triggers None specified Click "Edit With Form" above to add content

32

GRR/Section 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) | Open  

Open Energy Info (EERE)

18-CA-b - RCRA Process (Hazardous Waste Facility Permit) 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) 18CABRCRAProcess (2).pdf Click to View Fullscreen Contact Agencies California Environmental Protection Agency Department of Toxic Substances Control Regulations & Policies Resource Conservation and Recovery Act 40 CRF 261 Title 22, California Code of Regulations, Division 4.5 Triggers None specified Click "Edit With Form" above to add content 18CABRCRAProcess (2).pdf 18CABRCRAProcess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

33

RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)  

SciTech Connect (OSTI)

This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1997-04-01T23:59:59.000Z

34

Resource Conservation and Recovery Act  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resource Conservation and Recovery Act (RCRA) Resource Conservation and Recovery Act (RCRA) In 1965 the Solid Waste Disposal Act [Public Law (Pub. L.) 89-72] was enacted to improve solid waste disposal methods. It was amended in 1970 by the Resource Recovery Act (Pub. L. 91-512), which provided the Environmental Protection Agency (EPA) with funding for resource recovery programs. However, that Act had little impact on the management and ultimate disposal of hazardous waste. In 1976 Congress enacted the Resource Conservation and Recovery Act (RCRA, Pub. L. 94-580). RCRA established a system for managing non-hazardous and hazardous solid wastes in an environmentally sound manner. Specifically, it provides for the management of hazardous wastes from the point of origin to the point of final disposal (i.e., "cradle to grave"). RCRA also promotes resource recovery and waste minimization.

35

Monitoring of a RCRA Mixed Waste Management Facility  

SciTech Connect (OSTI)

Since startup of the Savannah River Site (SRS) in 1953, solid radioactive waste materials have been disposed of in a centrally located facility known as the Radioactive Waste Burial Grounds. These burial grounds comprise three distinct disposal sites which include the original set of burial trenches for solid low level radioactive wastes (643-G), the currently operating Low Level Radioactive Waste Disposal Facility (643-7G), and the Mixed Waste Management Facility (643-28G) located within 643-7G. The Mixed Waste Management Facility (MWMF) has been used to dispose of various low level radioactive waste materials just as the other portions of the Radioactive Waste Burial Grounds. Some of the waste materials in the MWMF have been classified as mixed waste under the Resource Conservation and Recovery Act (RCRA). Because the MWMF contains mixed wastes, a closure plan for the facility was developed and submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) to comply with RCRA requirements. This paper discusses the various aspects of the groundwater monitoring program developed to satisfy regulatory requirements for post-closure care and provides some initial results on groundwater quality.

Gordon, D.E.; Stevens, C.B.; Tuckfield, R.C.

1989-01-01T23:59:59.000Z

36

Monitoring of a RCRA Mixed Waste Management Facility  

SciTech Connect (OSTI)

Since startup of the Savannah River Site (SRS) in 1953, solid radioactive waste materials have been disposed of in a centrally located facility known as the Radioactive Waste Burial Grounds. These burial grounds comprise three distinct disposal sites which include the original set of burial trenches for solid low level radioactive wastes (643-G), the currently operating Low Level Radioactive Waste Disposal Facility (643-7G), and the Mixed Waste Management Facility (643-28G) located within 643-7G. The Mixed Waste Management Facility (MWMF) has been used to dispose of various low level radioactive waste materials just as the other portions of the Radioactive Waste Burial Grounds. Some of the waste materials in the MWMF have been classified as mixed waste under the Resource Conservation and Recovery Act (RCRA). Because the MWMF contains mixed wastes, a closure plan for the facility was developed and submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) to comply with RCRA requirements. This paper discusses the various aspects of the groundwater monitoring program developed to satisfy regulatory requirements for post-closure care and provides some initial results on groundwater quality.

Gordon, D.E.; Stevens, C.B.; Tuckfield, R.C.

1989-12-31T23:59:59.000Z

37

1999 Annual Mixed Waste Management Facility Groundwater Correction - Action Report (Volumes I, II, and III)  

SciTech Connect (OSTI)

This Corrective Action Report (CAR) for the Mixed Waste Management Facility (MWMF) is being prepared to comply with the Resource Conservation and Recovery Act (RCRA) Permit Number SC1 890 008 989, dated October 31, 1999. This CAR compiles and presents all groundwater sampling and monitoring activities that are conducted at the MWMF. As set forth in previous agreements with South Carolina Department of Health and Environmental Control (SCDHEC), all groundwater associated with the Burial Ground Complex (BGC) (comprised of the MWMF, Low-Level Radioactive Waste Disposal Facility, and Old Radioactive Waste Burial Ground) will be addressed under this RCRA Permit. This CAR is the first to be written for the MWMF and presents monitoring activities and results as an outcome of Interim Status and limited Permitted Status activities. All 1999 groundwater monitoring activities were conducted while the MWMF was operated during Interim Status. Changes to the groundwater monitoring program were made upon receipt of the RCRA Permit, where feasible. During 1999, 152 single-screened and six multi-screened groundwater monitoring wells at the BGC monitored groundwater quality in the uppermost aquifer as required by the South Carolina Hazardous Waste Management Regulations (SCHWMR), settlement agreements 87-52-SW and 91-51-SW, and RCRA Permit SC1 890 008 989. However, overall compliance with the recently issued RCRA Permit could not be implemented until the year 2000 due to the effective date of the RCRA Permit and scheduling of groundwater monitoring activities. Changes have been made to the groundwater monitoring network to meet Permit requirements for all 2000 sampling events.

Chase, J.

2000-06-14T23:59:59.000Z

38

RCRA groundwater monitoring data. Quarterly report, April 1, 1995--June 30, 1995  

SciTech Connect (OSTI)

Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between April and June 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter, but also data from earlier sampling events that were not previously reported.

NONE

1995-10-01T23:59:59.000Z

39

Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas  

SciTech Connect (OSTI)

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

ROGERS, P.M.

2000-06-01T23:59:59.000Z

40

G:\\ESS\\248 RCRA\\SWMU Report Cor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

hazardous solid and liquid laboratory wastes. Materials are stored in metal and polyethylene containers WASTE DESCRIPTION: RCRA hazardous PCB solid and liquid lab waste. WASTE...

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995  

SciTech Connect (OSTI)

This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

NONE

1995-07-01T23:59:59.000Z

42

Glossary of CERCLA, RCRA and TSCA related terms and acronyms. Environmental Guidance  

SciTech Connect (OSTI)

This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993.

Not Available

1993-10-01T23:59:59.000Z

43

Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994  

SciTech Connect (OSTI)

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and {open_quotes}Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities{close_quotes} (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.

NONE

1995-04-01T23:59:59.000Z

44

G:\\ESS\\248 RCRA\\SWMU Report Cor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 UNIT NAME: S-409-20 DATE: 1192001 REGULATORY STATUS: SWMU LOCATION: This SWMU is located in the C-409 Building and is upstairs above the RCRA TCLP laboratory. APPROXIMATE...

45

RCRA Notification of Regulated Waste Activity (EPA Form 8700...  

Open Energy Info (EERE)

Notification of Regulated Waste Activity (EPA Form 8700-12) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Notification of Regulated Waste Activity...

46

RCRA Hazardous Waste Part A Permit Application: Instructions...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit Application: Instructions and Form (EPA Form 8700-23) Abstract This...

47

Monitoring Plan for RCRA Groundwater Assessment at the 216-U-12 Crib  

SciTech Connect (OSTI)

This document contains a revised and updated monitoring plan for RCRA interim status groundwater assessment, site hydrogeology, and a conceptual model of the RCRA treatment, storage, and disposal unit. Monitoring under interim status is expected to continue until the 216-U-12 crib is incorporated as a chapter into the Hanford Facility RCRA Permit or administratively closed as proposed to EPA and Ecology.

Williams, Bruce A.; Chou, Charissa J.

2005-09-20T23:59:59.000Z

48

Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility  

SciTech Connect (OSTI)

The 216-B-3 Pond system was a series of ponds used for disposal of liquid effluent from past Hanford production facilities. In operation from 1945 to 1997, the B Pond System has been a Resource Conservation and Recovery Act (RCRA) facility since 1986, with RCRA interim-status groundwater monitoring in place since 1988. In 1994 the expansion ponds of the facility were clean closed, leaving only the main pond and a portion of the 216-B-3-3 ditch as the currently regulated facility. In 2001, the Washington State Department of Ecology (Ecology) issued a letter providing guidance for a two-year, trial evaluation of an alternate, intrawell statistical approach to contaminant detection monitoring at the B Pond system. This temporary variance was allowed because the standard indicator-parameters evaluation (pH, specific conductance, total organic carbon, and total organic halides) and accompanying interim status statistical approach is ineffective for detecting potential B-Pond-derived contaminants in groundwater, primarily because this method fails to account for variability in the background data and because B Pond leachate is not expected to affect the indicator parameters. In July 2003, the final samples were collected for the two-year variance period. An evaluation of the results of the alternate statistical approach is currently in progress. While Ecology evaluates the efficacy of the alternate approach (and/or until B Pond is incorporated into the Hanford Facility RCRA Permit), the B Pond system will return to contamination-indicator detection monitoring. Total organic carbon and total organic halides were added to the constituent list beginning with the January 2004 samples. Under this plan, the following wells will be monitored for B Pond: 699-42-42B, 699-43-44, 699-43-45, and 699-44-39B. The wells will be sampled semi-annually for the contamination indicator parameters (pH, specific conductance, total organic carbon, and total organic halides) and annually for water quality parameters (chloride, iron, manganese, phenols, sodium, and sulfate). This plan will remain in effect until superseded by another plan or until B Pond is incorporated into the Hanford Facility RCRA Permit.

Barnett, D BRENT.; Smith, Ronald M.; Chou, Charissa J.; McDonald, John P.

2005-11-01T23:59:59.000Z

49

Transportable Vitrification System RCRA Closure Practical Waste Disposition Saves Time And Money  

SciTech Connect (OSTI)

The Transportable Vitrification System (TVS) was a large-scale vitrification system for the treatment of mixed wastes. The wastes contained both hazardous and radioactive materials in the form of sludge, soil, and ash. The TVS was developed to be moved to various United States Department of Energy (DOE) facilities to vitrify mixed waste as needed. The TVS consists of four primary modules: (1) Waste and Additive Materials Processing Module; (2) Melter Module; (3) Emissions Control Module; and (4) Control and Services Module. The TVS was demonstrated at the East Tennessee Technology Park (ETTP) during September and October of 1997. During this period, approximately 16,000 pounds of actual mixed waste was processed, producing over 17,000 pounds of glass. After the demonstration was complete it was determined that it was more expensive to use the TVS unit to treat and dispose of mixed waste than to direct bury this waste in Utah permitted facility. Thus, DOE had to perform a Resource Conservation and Recovery Act (RCRA) closure of the facility and find a reuse for as much of the equipment as possible. This paper will focus on the following items associated with this successful RCRA closure project: TVS site closure design and implementation; characterization activities focused on waste disposition; pollution prevention through reuse; waste minimization efforts to reduce mixed waste to be disposed; and lessons learned that would be integrated in future projects of this magnitude.

Brill, Angie; Boles, Roger; Byars, Woody

2003-02-26T23:59:59.000Z

50

Final voluntary release assessment/corrective action report  

SciTech Connect (OSTI)

The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

NONE

1996-11-12T23:59:59.000Z

51

National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3  

SciTech Connect (OSTI)

This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR {section}261.4(a)(4), ``Identification and Listing of Hazardous Waste,`` as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues.

NONE

1995-07-01T23:59:59.000Z

52

The marriage of RCRA and CERCLA at the Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

A key goal of the Rocky Flats Cleanup Agreement (RFCA) signed in July of 1996 was to provide a seamless marriage of the Resource Conservation and Recovery Act (RCRA) (and other media specific programs) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the implementing agencies of each. This paper examines the two years since the signing of RFCA and identifies the successes, failures, and stresses of the marriage. RFCA has provided an excellent vehicle for regulatory and substantive progress at the Department of Energy`s Rocky Flats facility. The key for a fully successful marriage is to build on the accomplishments to date and to continually improve the internal and external systems and relationships. To date, the parties can be proud of both the substantial accomplishment of substantive environmental work and the regulatory systems that have enabled the work.

Shelton, D.C.; Brooks, L.M.

1998-11-01T23:59:59.000Z

53

Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993  

SciTech Connect (OSTI)

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.

Not Available

1993-07-01T23:59:59.000Z

54

HAB Advice and Issue Tracking Process for Draft RCRA Site-Wide...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advice and Issue Tracking Process for Draft RCRA Site-Wide Permit Comment Period Last updated 5812 Introduction: The following document is a living document intended to be...

55

Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3  

SciTech Connect (OSTI)

This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

Not Available

1993-03-01T23:59:59.000Z

56

Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for Resource Conservation and Recovery Act (RCRA) constituents distributes test samples for analysis of volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and metals in solid matrices. Each distribution of test samples is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD; DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department. The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the RCRA PDP. Participating laboratories demonstrate acceptable performance by successfully analyzing single- blind performance evaluation samples (subsequently referred to as PDP samples) according to the criteria established in this plan. PDP samples are used as an independent means to assess laboratory performance regarding compliance with the WAP quality assurance objectives (QAOs). The concentrations of analytes in the PDP samples address levels of regulatory concern and encompass the range of concentrations anticipated in waste characterization samples. The WIPP requires analyses of homogeneous solid wastes to demonstrate compliance with regulatory requirements. These analyses must be performed by laboratories that demonstrate acceptable performance in this PDP. These analyses are referred to as WIPP analyses, and the samples on which they are performed are referred to as WIPP samples. Participating laboratories must analyze PDP samples using the same procedures used for WIPP samples.

Carlsbad Field Office

2006-09-21T23:59:59.000Z

57

An Illustration of the Corrective Action Process, The Corrective Action Management Unit at Sandia National Laboratories/New Mexico  

SciTech Connect (OSTI)

Corrective Action Management Units (CAMUs) were established by the Environmental Protection Agency (EPA) to streamline the remediation of hazardous waste sites. Streamlining involved providing cost saving measures for the treatment, storage, and safe containment of the wastes. To expedite cleanup and remove disincentives, EPA designed 40 CFR 264 Subpart S to be flexible. At the heart of this flexibility are the provisions for CAMUs and Temporary Units (TUs). CAMUs and TUs were created to remove cleanup disincentives resulting from other Resource Conservation Recovery Act (RCRA) hazardous waste provisions--specifically, RCRA land disposal restrictions (LDRs) and minimum technology requirements (MTRs). Although LDR and MTR provisions were not intended for remediation activities, LDRs and MTRs apply to corrective actions because hazardous wastes are generated. However, management of RCRA hazardous remediation wastes in a CAMU or TU is not subject to these stringent requirements. The CAMU at Sandia National Laboratories in Albuquerque, New Mexico (SNL/NM) was proposed through an interactive process involving the regulators (EPA and the New Mexico Environment Department), DOE, SNL/NM, and stakeholders. The CAMU at SNL/NM has been accepting waste from the nearby Chemical Waste Landfill remediation since January of 1999. During this time, a number of unique techniques have been implemented to save costs, improve health and safety, and provide the best value and management practices. This presentation will take the audience through the corrective action process implemented at the CAMU facility, from the selection of the CAMU site to permitting and construction, waste management, waste treatment, and final waste placement. The presentation will highlight the key advantages that CAMUs and TUs offer in the corrective action process. These advantages include yielding a practical approach to regulatory compliance, expediting efficient remediation and site closure, and realizing potentially significant cost savings compared to off-site disposal. Specific examples of CA MU advantages realized by SNL/NM will be presented along with the above highlighted process improvements, Integrated Safety Management System (ISMS) performance, and associated lessons learned.

Irwin, M.; Kwiecinski, D.

2002-02-26T23:59:59.000Z

58

Quarterly RCRA Groundwater Monitoring Data for the Period April Through June 2006  

SciTech Connect (OSTI)

This report provides information about RCRA groundwater monitoring for the period April through June 2006. Seventeen RCRA sites were sampled during the reporting quarter. Sampled sites include seven monitored under groundwater indicator evaluation (''detection'') programs, eight monitored under groundwater quality assessment programs, and two monitored under final-status programs.

Hartman, Mary J.

2006-11-01T23:59:59.000Z

59

Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources / Related Web Sites Resources / Related Web Sites Buildings-Related Resources Windows & Glazing Resources Energy-Related Resources International Resources Telephone Directories Buildings-Related Resources California Institute for Energy Efficiency (CIEE) Center for Building Science (CBS) at LBNL Department of Energy (DOE) DOE Energy Efficiency home page Energy Efficiency and Renewable Energy Clearinghouse Fact sheets in both HTML for standard web browsers and PDF format using Adobe Acrobat Reader (free). National Fenestration Rating Council home page Office of Energy Efficiency and Renewable Energy (EREN) back to top... Windows & Glazing Resources National Glass Association (NGA) LBNL Building Technologies Fenestration R&D news LBNL Center for Building Science (CBS) Newsletter

60

Energy Efficiency as a Low-Cost Resource for Achieving Carbon Emissions Reductions A RESOURCE OF THE NATIONAL ACTION PLAN FOR ENERGY EFFICIENCY  

E-Print Network [OSTI]

This paper, Energy Efficiency as a Low-Cost Resource for Achieving Carbon Emissions Reductions, is provided to assist utility regulators, gas and electric utilities, and others in meeting the National Action Plan for Energy Efficiencys goal of achieving all cost-effective energy efficiency by 2025. This paper summarizes the scale and economic value of energy efficiency for reducing carbon emissions and discusses the barriers to achieving the potential for cost-effective energy efficiency. It also reviews current regional, state, and local approaches for including energy efficiency in climate policy, using these approaches to inform a set of recommendations for leveraging energy efficiency within state climate policy. The paper does not capture federal climate policy options or recommendations, discussion of tradable energy efficiency credits, or emissions impacts of specific energy efficiency measures or programs. The intended audience for the paper is any stakeholder interested in learning more about how to advance energy efficiency as a low-cost resource to reduce carbon emissions. All stakeholders, including state policy-makers, public utility commissions, city councils, and utilities, can use this paper to understand the key issues and terminology, as well as the approaches that are being used to reduce carbon emissions by advancing energy efficiency policies and programs. Energy Efficiency as a Low-Cost

unknown authors

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range  

SciTech Connect (OSTI)

This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan.

NONE

1996-09-01T23:59:59.000Z

62

Remedial action work plan for the Colonie site. Revision 1  

SciTech Connect (OSTI)

The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab.

Not Available

1985-08-01T23:59:59.000Z

63

Resources  

Broader source: Energy.gov [DOE]

Case studies and additional resources on implementing renewable energy in Federal new construction and major renovations are available.

64

RCRA Facility Investigation/Remedial Investigation Report for Gunsite 720 Rubble Pit Unit (631-16G) - March 1996  

SciTech Connect (OSTI)

Gunsite 720 Rubble Pit Unit is located on the west side of SRS. In the early to mid 1980`s, while work was being performed in this area, nine empty, partially buried drums, labeled `du Pont Freon 11`, were found. As a result, Gunsite 720 became one of the original waste units specified in the SRS RCRA Facility Assessment (RFA). The drums were excavated on July 30, 1987 and placed on a pallet at the unit. Both the drums and pallet were removed and disposed of in October 1989. The area around the drums was screened during the excavation and the liquid (rainwater) that collected in the excavated drums was sampled prior to disposal. No evidence of hazardous materials was found. Based on the review of the analytical data and screening techniques used to evaluate all the chemicals of potential concern at Gunsite 720 Rubble Pit Unit, it is recommended that no further remedial action be performed at this unit.

Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1996-03-01T23:59:59.000Z

65

Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1993  

SciTech Connect (OSTI)

This report presents the annual hydrogeologic evaluation of 20 Resource Conservation and Recovery Act of 1976 groundwater monitoring projects and 1 nonhazardous waste facility at the US Department of Energy`s Hanford Site. Most of the projects no longer receive dangerous waste; a few projects continue to receive dangerous waste constituents for treatment, storage, or disposal. The 20 RCRA projects comprise 30 waste management units. Ten of the units are monitored under groundwater quality assessment status because of elevated levels of indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration, distribution, and rate of migration are evaluated. Groundwater is monitored at the other 20 units to detect contamination, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1992 and September 1993. Recent groundwater quality is also described for the 100, 200, 300, and 600 Areas and for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

Not Available

1994-02-01T23:59:59.000Z

66

E-Print Network 3.0 - accumulation areas rcra Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

an assessment... is commercially available to treat or dispose of a particular waste and the facility has either (1) a RCRA permit... BILLING CODE 6560-50-P FRL-5463-4...

67

Closure plan for Corrective Action Unit 94: Building 650 Leachfield, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The Building 650 Leachfield, Corrective Action Unit (CAU) 94, will be clean closed by removal in accordance with the Resource Conservation and Recover Act (RCRA) operational permit and the Federal Facility Agreement and Consent Order. Historically, laboratory effluent was discharged through pipelines leading from the Radiochemistry Laboratory in Building 650 to a distribution box and a series of pipes dispersed across the leachfield. Effluent from the laboratory contained both hazardous and radioactive constituents. Discharge of hazardous and radioactive waste began in 1965. Discharge of radioactive waste ended in 1979 and hazardous waste discharge ended in 1987. From 1987 to 1993 the leachfield was used for the disposal of non-hazardous waste water. The piping leading to the leachfield was sealed in 1993.

NONE

1998-03-01T23:59:59.000Z

68

Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources News & Events Expand News & Events Skip navigation links Smart Grid Demand Response Agricultural Residential Demand Response Commercial & Industrial Demand Response...

69

RCRA Facility Investigation/Remedial Investigation Report with the Baseline Risk Assessment for the 716-A Motor Shops Seepage Basin  

SciTech Connect (OSTI)

This document describes the RCRA Facility Investigation/Remedial Investigation/Baseline Risk Assessment of the 716-A Motor Shops Seepage Basin.

Palmer, E.

1997-08-25T23:59:59.000Z

70

GRR/Section 18-NV-b - State RCRA Process | Open Energy Information  

Open Energy Info (EERE)

b - State RCRA Process b - State RCRA Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-NV-b - State RCRA Process 18NVBStateRCRAProcess.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 18NVBStateRCRAProcess.pdf 18NVBStateRCRAProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Within the Nevada Division of Environmental Protection in Nevada, the Bureau of Waste Management (BWM) operates a permitting and compliance

71

Quarterly report of RCRA groundwater monitoring data for period July 1--September 30, 1995  

SciTech Connect (OSTI)

Nineteen RCRA groundwater monitoring projects are conducted at the Hanford site. They include treatment, storage, and disposal facilities for both solid and liquid waste. Groundwater monitoring programs described in this report comply with the interim- and final- status federal and state regulations. The RCRA projects are monitored under one of the following programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment or detection. This quarterly report contains data received between July 1 and Sept. 30, 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the July-Sept. quarter, but also data from earlier sampling events not previously reported.

NONE

1996-01-01T23:59:59.000Z

72

RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1  

SciTech Connect (OSTI)

The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

NONE

1995-09-01T23:59:59.000Z

73

Description of Proposed Action  

Broader source: Energy.gov (indexed) [DOE]

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

74

Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993  

SciTech Connect (OSTI)

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

Jungers, D.K.

1993-10-01T23:59:59.000Z

75

RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 5, Technical Memorandums 06-09A, 06-10A, and 06-12A: Environmental Restoration Program  

SciTech Connect (OSTI)

This report provides a detailed summary of the activities carried out to sample groundwater at Waste Area Grouping (WAG) 6. The analytical results for samples collected during Phase 1, Activity 2 of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI) are also presented. In addition, analytical results for Phase 1, activity sampling events for which data were not previously reported are included in this TM. A summary of the groundwater sampling activities of WAG 6, to date, are given in the Introduction. The Methodology section describes the sampling procedures and analytical parameters. Six attachments are included. Attachments 1 and 2 provide analytical results for selected RFI groundwater samples and ORNL sampling event. Attachment 3 provides a summary of the contaminants detected in each well sampled for all sampling events conducted at WAG 6. Bechtel National Inc. (BNI)/IT Corporation Contract Laboratory (IT) RFI analytical methods and detection limits are given in Attachment 4. Attachment 5 provides the Oak Ridge National Laboratory (ORNL)/Analytical Chemistry Division (ACD) analytical methods and detection limits and Resource Conservation and Recovery Act (RCRA) quarterly compliance monitoring (1988--1989). Attachment 6 provides ORNL/ACD groundwater analytical methods and detection limits (for the 1990 RCRA semi-annual compliance monitoring).

Not Available

1991-09-01T23:59:59.000Z

76

Borehole Data Package for Two RCRA Wells 299-W11-25B and 299-W11-46 at Single-Shell Tank Waste Management Area T, Hanford Site, Washington  

SciTech Connect (OSTI)

One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring and assessment well was installed at single-shell tank Waste Management Area (WMA) T in calendar year 2005 in partial fulfillment of commitments for well installations proposed in Hanford Federal Facility Agreement and Consent Order, Milestone M-24-57 (2004). The need for increased monitoring capability at this WMA was identified during a data quality objectives process for establishing a RCRA/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)/Atomic Energy Act (AEA) integrated 200 West and 200 East Area Groundwater Monitoring Network. The initial borehole, 299-W11-25B, was located about 20 ft from existing downgradient well 299 W11-39. The specific objective for the borehole was to determine the vertical distribution of contaminants in the unconfined aquifer at the northeast corner of WMA T. The permanent casing in borehole 299-W11-25B was damaged beyond repair during well construction and replacement borehole, 299-W11-46, was drilled about 10 ft from borehole 299-W11-25B (Figure 1). Borehole 299-W11-46 was completed as a RCRA monitoring well. This document provides a compilation of all available geologic data, geophysical logs, hydrogeologic data and well information obtained during drilling, well construction, well development, pump installation, groundwater sampling and analysis activities, and preliminary results of slug tests associated with wells 299-W11-25B and 299-W11-46. Appendix A contains geologists logs, Well Construction Summary Reports, Well Summary Sheets (as-built diagrams), and Well Development and Testing Data sheets. Appendix B contains the results of chemical analysis of groundwater samples. Appendix C contains complete spectral gamma-ray logs and borehole deviation surveys and Appendix D contains initial results of slug tests. The non-conformance report for borehole 299-W11-46 is provided in Appendix E.

Horton, Duane G.; Chamness, Mickie A.

2006-04-17T23:59:59.000Z

77

RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY  

SciTech Connect (OSTI)

WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modified in 40 CFR Part 265, Subpart F and Washington States Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

Horton, Duane G.

2007-03-26T23:59:59.000Z

78

Chapter 13 Cultural Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

proposed routes for the action alternatives and the extensive area covered by the APE, BPA developed a predictive analysis to assess the potential for cultural resources along...

79

DOE/EA-0820 ENVIRONMENTAL ASSESSMENT Construction of Mixed Waste Storage RCRA Facilities,  

Broader source: Energy.gov (indexed) [DOE]

20 20 ENVIRONMENTAL ASSESSMENT Construction of Mixed Waste Storage RCRA Facilities, Buildings 7668 and 7669 u.s. Department of Energy Oak Ridge National Laboratory Oak Ridge, Tennessee April 1994 ER t>ISTRf8UT!Q~~ Or-~I-:r8 DOCUMENT IS UNLlMIT~ DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial

80

Building Technologies Office: Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources to someone by Resources to someone by E-mail Share Building Technologies Office: Resources on Facebook Tweet about Building Technologies Office: Resources on Twitter Bookmark Building Technologies Office: Resources on Google Bookmark Building Technologies Office: Resources on Delicious Rank Building Technologies Office: Resources on Digg Find More places to share Building Technologies Office: Resources on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Home Energy Score Home Performance with ENERGY STAR Better Buildings Neighborhood Program Challenge Home Partner Log In Become a Partner Criteria Partner Locator Resources Housing Innovation Awards Events Guidelines for Home Energy Professionals Technology Research, Standards, & Codes

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Closure Report (CR) for Corrective Action Unit (CAU) 91: Area 3 U-3fi Injection Well with Errata Sheet and Certification, Revision 0  

SciTech Connect (OSTI)

The closure report for CAU 91 has no Use Restriction Form or drawing/map included in the document to describe the use restricted area, however, Section 3.3.3 states that the site will be fenced and signage placed indicating the area as a Resource Conservation and Recovery Act (RCRA) Unit. The drawing that was placed in the FFACO indicating the use restricted area lists the coordinates for the RCRA Unit in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner, which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the RCRA Unit with the coordinates listed showing the use restricted area.

Navarro Nevada Environmental Services

2010-08-10T23:59:59.000Z

82

RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Central Shops Burning/Rubble Pit (631-6G), Volume 1 Final  

SciTech Connect (OSTI)

The Burning/Rubble Pits at the Savannah River Site were usually shallow excavations approximately 3 to 4 meters in depth. Operations at the pits consisted of collecting waste on a continuous basis and burning on a monthly basis. The Central Shops Burning/Rubble Pit 631- 6G (BRP6G) was constructed in 1951 as an unlined earthen pit in surficial sediments for disposal of paper, lumber, cans and empty galvanized steel drums. The unit may have received other materials such as plastics, rubber, rags, cardboard, oil, degreasers, or drummed solvents. The BRP6G was operated from 1951 until 1955. After disposal activities ceased, the area was covered with soil. Hazardous substances, if present, may have migrated into the surrounding soil and/or groundwater. Because of this possibility, the United States Environmental Protection Agency (EPA) has designated the BRP6G as a Solid Waste Management Unit (SWMU) subject to the Resource Conservation Recovery Act/Comprehensive Environmental Response, Compensation and Liability Act (RCRA/CERCLA) process.

NONE

1996-04-01T23:59:59.000Z

83

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre@ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4.

Not Available

1992-12-01T23:59:59.000Z

84

Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

SciTech Connect (OSTI)

This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

Evans, S.K.

2002-01-31T23:59:59.000Z

85

Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

SciTech Connect (OSTI)

This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

Evans, Susan Kay; Orchard, B. J.

2002-01-01T23:59:59.000Z

86

Offshore wind resource assessment in European Seas, state-of-the art. A survey within the FP6 "POW'WOW" Coordination Action Project.  

E-Print Network [OSTI]

Offshore wind resource assessment in European Seas, state-of- the ­art. A survey within the FP6, Germany (5) FORWIND, University of Oldenburg, Germany ABSTRACT To plan an offshore wind farm, a careful the sea within about 50 km from the coast. However, installation of offshore high masts is very expensive

87

POSITION MANAGEMENT ACTION FORM  

E-Print Network [OSTI]

POSITION MANAGEMENT ACTION FORM Workforce Planning | 408-924-2250 classcomp@sjsu.edu SJSU Human FOR POSITION MANAGEMENT FORM Workforce Planning | 408-924-2250| classcomp@sjsu.edu SJSU Human Resources Revised contact your Workforce Planning Analyst. List the name of the position this position reports to

Eirinaki, Magdalini

88

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada For Fiscal Year 2012 (October 2011September 2012)  

SciTech Connect (OSTI)

This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): CAU 90, Area 2 Bitcutter Containment CAU 91, Area 3 U-3fi Injection Well CAU 92, Area 6 Decon Pond Facility CAU 110, Area 3 WMD U-3ax/bl Crater CAU 111, Area 5 WMD Retired Mixed Waste Pits CAU 112, Area 23 Hazardous Waste Trenches This report covers fiscal year 2012 (October 2011September 2012).

NSTec Environmental Restoration

2013-01-17T23:59:59.000Z

89

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada for fiscal year 2013 (October 2012 - September 2013)  

SciTech Connect (OSTI)

This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and, CAU 112, Area 23 Hazardous Waste Trenches.

None,

2014-01-31T23:59:59.000Z

90

Implementing the Corrective Action Management Unit at Sandia National Laboratories, New Mexico  

SciTech Connect (OSTI)

In September 1997, following significant public and regulator interaction, Sandia Corporation (Sandia) was granted a Resource Conservation and Recovery Act (RCRA) and Hazardous Solid Waste Amendment (HSWA) permit modification allowing construction and operation of a Correction Action Management Unit (CAMU). The CAMU follows recent regulatory guidance that allows for cost-effective, expedient cleanup of contaminated sites and management of hazardous remediation wastes. The CAMU was designed to store, treat, and provide long-term management for Environmental Restoration (ER) derived wastes. The 154 square meter CAMU site at Sandia National Laboratories, New Mexico (SNL/NM), includes facilities for storing bulk soils and containerized wastes, for treatment of bulk soils, and has a containment cell for long-term disposition of waste. Proposed treatment operations include soil washing and low temperature thermal desorption. The first waste was accepted into the CAMU for temporary storage in January 1999. Construction at the CAMU was completed in March 1999, and baseline monitoring of the containment cell has commenced. At completion of operations the facility will be closed, the waste containment cell will be covered, and long-term post-closure monitoring will begin. Sandia's CAMU is the only such facility within the US Department of Energy (DOE) complex. Implementing this innovative approach to ER waste management has required successful coordination with community representatives, state and federal regulators, the DOE, Sandia corporate management, and contractors. It is expected that cost savings to taxpayers will be significant. The life-cycle CAMU project cost is currently projected to be approximately $12 million.

MOORE,DARLENE R.; SCHRADER,SCOTT A.; KING,GABRIEL G.; CORMIER,JOHN

2000-01-26T23:59:59.000Z

91

Corrective action management unit application for the Environmental Restoration Disposal Facility  

SciTech Connect (OSTI)

The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

Evans, G.C.

1994-06-01T23:59:59.000Z

92

E-Print Network 3.0 - actions significant actions Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

should begin work on its Action Team Plan. ... Source: Environmental Protection Agency, Technology Innovation Program (TIP) Collection: Multidisciplinary Databases and Resources...

93

Computer resources Computer resources  

E-Print Network [OSTI]

Computer resources 1 Computer resources available to the LEAD group Cédric David 30 September 2009 #12;Ouline · UT computer resources and services · JSG computer resources and services · LEAD computers· LEAD computers 2 #12;UT Austin services UT EID and Password 3 https://utdirect.utexas.edu #12;UT Austin

Yang, Zong-Liang

94

RCRA Facility Investigation/Remedial Investigation Report for the Grace Road Site (631-22G)  

SciTech Connect (OSTI)

This report summarizes the activities and documents the results of a Resource Conservation and Recovery Act Facility Investigation/Remedial Investigation conducted at Grace Road Site on the Savannah River Site near Aiken, South Carolina.

Palmer, E.

1998-10-02T23:59:59.000Z

95

Post-Closure RCRA Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch  

SciTech Connect (OSTI)

The purpose of this plan is to provide a post-closure groundwater monitoring program for the 216-S-10 Pond and Ditch (S-10) treatment, storage, and/or disposal (TSD) unit. The plan incorporates the sum of knowledge about the potential for groundwater contamination to originate from the S-10, including groundwater monitoring results, hydrogeology, and operational history. The S-10 has not received liquid waste since October 1991. The closure of S-10 has been coordinated with the 200-CS-1 source operable unit in accordance with the Tri-Party Agreement interim milestones M-20-39 and M-15-39C. The S-10 is closely situated among other waste sites of very similar operational histories. The proximity of the S-10 to the other facilities (216-S-17 pond, 216-S-11 Pond, 216-S-5,6 cribs, 216-S-16 ditch and pond, and 216-U-9 ditch) indicate that at least some observed groundwater contamination beneath and downgradient of S-10 could have originated from waste sites other than S-10. Hence, it may not be feasible to strictly discriminate between the contributions of each waste site to groundwater contamination beneath the S-10. A post-closure groundwater monitoring network is proposed that will include the drilling of three new wells to replace wells that have gone dry. When completed, the revised network will meet the intent for groundwater monitoring network under WAC 173-303-645, and enable an improved understanding of groundwater contamination at the S-10. Site-specific sampling constituents are based on the dangerous waste constituents of concern relating to RCRA TSD unit operations (TSD unit constituents) identified in the Part A Permit Application. Thus, a constituent is selected for monitoring if it is: A dangerous waste constituent identified in the Part A Permit Application, or A mobile decomposition product (i.e., nitrate from nitrite) of a Part A constituent, or A reliable indicator of the site-specific contaminants (i.e., specific conductance). Using these criteria, the following constituent list and sampling schedule is proposed: Constituent; Sampling Frequency Site-Specific Parameters; Hexavalent chromium (a); Semiannual Chloride; Semiannual Fluoride; Semiannual Nitrate; Semiannual Nitrite; Semiannual Specific conductance (field)(a); Semiannual Ancillary Parameters; Anions; Annual Alkalinity Annual Metals, (in addition to chromium); Annual pH (field) Semiannual Temperature (field); Semiannual Turbidity (field) Semiannual (a). These constituents will be subject to statistical tests after background is established. It will be necessary to install new monitoring wells and accumulate background data on the groundwater from those wells before statistical comparisons can be made. Until then, the constituents listed above will be evaluated by tracking and trending concentrations in all wells and comparing these results with the corresponding DWS or Hanford Site background concentration for each constituent. If a comparison value (background or DWS) for a constituent is exceeded, DOE will notify Ecology per WAC 173-303-645 (9) (g) requirements (within seven days or a time agreed to between DOE and Ecology).

Barnett, D BRENT.; Williams, Bruce A.; Chou, Charissa J.; Hartman, Mary J.

2006-03-17T23:59:59.000Z

96

3Q/4Q99 F-Area Hazardous Waste Management Facility Corrective Action Report - Third and Fourth Quarter 1999, Volumes I and II  

SciTech Connect (OSTI)

Savannah River Site (SRS) monitors groundwater quality at the F-Area Hazardous Waste management Facility (HWMF) and provides results of this monitoring to the South Carolina Department of Health and Environmental Control (SCDHEC) semiannually as required by the Resource Conservation and Recovery Act (RCRA) permit. SRS also performs monthly sampling of the Wastewater Treatment Unit (WTU) effluent in accordance with Section C of the Underground Injection Control (UIC) application.

Chase, J.

2000-05-12T23:59:59.000Z

97

Resource Analysis  

Broader source: Energy.gov [DOE]

Resource Analysis determines the quantity and location of resources needed to produce hydrogen. Additionally, resource analysis quantifies the cost of the resources, as a function of the amount...

98

Borehole Data Package for RCRA Wells 299-E25-93 and 299-E24-22 at Single-Shell Tank Waste Management Area A-AX, Hanford Site, Washington  

SciTech Connect (OSTI)

Two new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at single-shell tank Waste Management Area (WMA) A-AX in fiscal year 2003 to fulfill commitments for well installations proposed in the draft Hanford Federal Facility Agreement and Consent Order M-24-00. Well 299-E24-22 has been installed upgradient and well 299-E25-93 downgradient of the WMA. Specific objectives for these wells include monitoring the impact, if any, that potential releases from inside the WMA may have on current groundwater conditions (i.e., improved network coverage); differentiating upgradient groundwater contamination from contaminants released at the WMA; and improving the determination of groundwater flow direction (i.e., improved water table determinations). This report supplies the information obtained during drilling, characterization, and installation of the two new groundwater monitoring wells, 299-E25-93 and 299-E24-22. This document also provides a compilation of hydrogeologic and well construction information obtained during drilling, well construction, well development, pump installation, aquifer testing, and sample collection/analysis activities.

Williams, B; Narbutovskih, Susan M.

2003-12-15T23:59:59.000Z

99

Chicago Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Action Plan Action Plan Jump to: navigation, search Name Chicago Climate Action Plan Agency/Company /Organization City of Chicago Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Prepare a Plan Topics Low emission development planning Resource Type Case studies/examples Availability Free Website http://www.chicagoclimateactio Locality Chicago, IL References Chicago Climate Action Plan[1] Overview Chicago's Climate Action Plan addresses both mitigation of and adaptation to climate change and encompasses the entire city (rather than only City operations). The plan contains a high-level overview of Chicago's climate action initiatives, including 26 mitigation strategies and nine adaptation

100

First annual report RCRA post-closure monitoring and inspections for the U-3fi waste unit. Final report, July 1995--October 1996  

SciTech Connect (OSTI)

This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the U-3fi RCRA Unit, located in Area 3 of the Nevada Site (NTS), Nye County, Nevada during the July 1995 to October 1996 period. Inspections of the U-3fi RCRA Unit are conducted to determine and document the physical condition of the covers, facilities, and any unusual conditions that could impact the proper operation of the waste unit closure. The objective of the neutron logging is to monitor the soil moisture conditions along the 420 ft ER3-3 borehole and detect changes that may be indicative of moisture movement in the regulated interval. This is the first annual report on the U-3fi closure and includes the first year baseline monitoring data as well as one quarter of compliance monitoring data.

Emer, D.F.

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

RCRA closure of an explosive ordnance disposal (EOD) range, Wright-Patterson Air Force Base, Ohio: Circumstances leading to a risk based approach  

SciTech Connect (OSTI)

After approximately 40 years of operation of an Explosive Ordnance Disposal (EOD) Range at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio, operations were suspended in late 1990 by the Ohio Environmental Protection Agency (OEPA). The closure of several notice of violations and reopening of the EOD Range were the initial objectives, but in 1995 a formal commitment for RCRA closure was made. The EOD Range, used for disposal of ordnance via open burning and open detonation, is a fenced 5 acre site and is located in a 100 year flood plain. Investigations performed in 1991 through 1994 to fully characterize the site indicated the presence of heavy metals and petroleum contamination in soils. Of particular concern were elevated levels of arsenic and lead. Localized remediations were attempted in 1993, but because of continued disagreement on cleanup levels with OEPA, these remediations were unsuccessful. Strict interpretation of OEPA RCRA closure guidance would have required the removal of soil from the entire five acre EOD Range to a depth of 4--5 feet, at a cost of approximately $6,000,000. However, in early 1995 a partnering session held with OEPA led to an improved regulatory relationship with OEPA. This improved relationship, along with new information compiled on industrial background concentrations of heavy metals at RCRA sites in Ohio, and emerging OEPA guidance on broader risk ranges for closure may prove to be key in reducing closure requirements. A draft Closure Plan has been submitted to OEPA which proposes a risk-based approach for closure. The plan is currently under review by OEPA. If approved, the AF could realize a substantial savings of greater than $5,000,000. This paper details the sequence of events in performing a RCRA closure at the EOD range, including the site conditions and field activities, and the evolution of closure requirements.

Tumbusch, C. [Air Force, Wright-Patterson AFB, OH (United States). Office of Environmental Management; Martin, J. [International Technology Corp., Cincinnati, OH (United States)

1997-12-31T23:59:59.000Z

102

Action Items  

Broader source: Energy.gov (indexed) [DOE]

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

103

Environmental Assessment and Corrective Measures Study Report for Remediating Contamination at Lawrence Berkeley National Laboratory Regulated under the Resource Conservation and Recovery Act  

Broader source: Energy.gov (indexed) [DOE]

27 27 Environmental Assessment and Corrective Measures Study Report for Remediating Contamination at Lawrence Berkeley National Laboratory Regulated under the Resource Conservation and Recovery Act September 2005 United States Department of Energy Office of Environmental Management Office of Science EA & RCRA CMS Report i September 2005 CONTENTS Page LIST OF ABBREVIATIONS...................................................................................................... viii EXECUTIVE SUMMARY .............................................................................................................x SECTION 1 INTRODUCTION .............................................................................................1 1.1 PURPOSE AND SCOPE..........................................................................1

104

Better Buildings Neighborhood Program: Business Model Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Model Business Model Resources to someone by E-mail Share Better Buildings Neighborhood Program: Business Model Resources on Facebook Tweet about Better Buildings Neighborhood Program: Business Model Resources on Twitter Bookmark Better Buildings Neighborhood Program: Business Model Resources on Google Bookmark Better Buildings Neighborhood Program: Business Model Resources on Delicious Rank Better Buildings Neighborhood Program: Business Model Resources on Digg Find More places to share Better Buildings Neighborhood Program: Business Model Resources on AddThis.com... Getting Started Assess the Market Establish Goals & Objectives Develop Plans of Action Business Model Resources Driving Demand Financing Workforce Development Business Model Resources Business Models Workshop and Materials

105

Surveillance Guide - ERS 14.1 Satellite Accumulation Ares (RCRA Compliance)  

Broader source: Energy.gov (indexed) [DOE]

SATELLITE ACCUMULATION AREAS SATELLITE ACCUMULATION AREAS 1.0 Objective The objective of this surveillance is to evaluate the effectiveness of the contractor's management of hazardous and mixed wastes in satellite accumulation areas. The Facility Representative evaluates compliance with DOE requirements as well as requirements of the Resource Conservation and Recovery Act and the Washington State Administrative Code. During this surveillance, the Facility Representative conducts a walk through of a satellite accumulation area and reviews the pertinent records. 2.0 References 2.1 40 CFR 260-270 2.2 Washington Administrative Code, Chapters 173-303 2.3 DOE 5400.3, Hazardous and Radioactive Mixed Waste Program 2.4 DOE 5820.2A, Radioactive Waste Management. 2.5 DOE/EH - 0333, Management of Hazardous Waste

106

Climate Change Action Plan Report  

E-Print Network [OSTI]

Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

Hansen, Andrew J.

107

Integrating local action elements for action analysis  

Science Journals Connector (OSTI)

In this paper, we propose a framework for human action analysis from video footage. A video action sequence in our perspective is a dynamic structure of sparse local spatial-temporal patches termed action elements, so the problems of action analysis ... Keywords: Action classification, Action distance function, Action matching, Action retrieval, Generalized Hough Transform, Implicit Shape Model, Multi-dimensional density estimation, Sparse Bayesian classifier, Spatial temporal feature

Tuan Hue Thi; Li Cheng; Jian Zhang; Li Wang; Shinichi Satoh

2012-03-01T23:59:59.000Z

108

Marketing Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Expand Utility Resources News & Events Expand News & Events Skip navigation links Marketing Resources Reports, Publications, and Research Utility Toolkit Informational...

109

Rangeland Resource Management for Texans: Why are Goals Important for Natural Resource Management?  

E-Print Network [OSTI]

This publication discusses the need for rangeland resource managers to set goals and then to take the correct actions to achieve those goals....

White, Larry D.; Fox, William E.

2002-04-29T23:59:59.000Z

110

Teacher Resource Center: Curricular Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Curricular Resources Curricular Resources TRC Home TRC Fact Sheet Library Curricular Resources Science Fair Resources Bibliographies sciencelines The Best of sciencelines Archives Annotated List of URLs Catalog Teacher's Lounge Full Workshop Catalog Customized Workshops Scheduled Workshops Special Opportunities Teacher Networks Science Lab Fermilab Science Materials Samplers Order Form Science Safety Issues Tech Room Fermilab Web Resources The Teacher Resource Center provides workshops and consultations on Mathematics and Science Curriculum development. Here are a list of resources for educators. See the 'Customized Workshops" link in the "Teacher's Lounge" for information about more workshops available through the TRC. Key Science Resources for Curriculum Planning Key Science Resources for Curriculum Planning

111

Forest Monitoring for Action (FORMA) | Open Energy Information  

Open Energy Info (EERE)

Forest Monitoring for Action (FORMA) Forest Monitoring for Action (FORMA) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Forest Monitoring for Action (FORMA) Agency/Company /Organization: Center for Global Development Sector: Land, Climate Focus Area: Forestry Topics: GHG inventory, Resource assessment Resource Type: Maps Website: www.cgdev.org/section/initiatives/_active/forestmonitoringforactionfor Cost: Free Forest Monitoring for Action (FORMA) Screenshot References: FORMA[1] "Forest Monitoring for Action (FORMA) uses freely available satellite data to generate rapidly updated online maps of tropical forest clearing, providing useful information for local and national forest conservation programs, as well as international efforts to curb greenhouse gas emissions by paying to keep forests intact."

112

M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwate Monitoring and Corrective-Action Report, First and Second Quarters 1998, Volumes I, II, & III  

SciTech Connect (OSTI)

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah river Site (SRS) during first and second quarters 1998. This program is required by South Carolina Hazardous Waste Permit SC1-890-008-989 and Section 264.100(g) of the South Carolina Hazardous Waste Management Regulations. Report requirements are described in the 1995 RCRA Renewal Permit, effective October 5, 1995, Section IIIB.H.11.b for the M-Area HWMF and Section IIIG.H.11.b for the Met Lab HWMF.

Chase, J.

1998-10-30T23:59:59.000Z

113

Natural Resources Defense Council Consent Decree, May 26, 1988 Summary  

Broader source: Energy.gov (indexed) [DOE]

Decree No. 1:85-2583-6 Decree No. 1:85-2583-6 State South Carolina Agreement Type Consent Decree Legal Driver(s) RCRA Scope Summary Establish guidelines for the closure of certain facilities at the Savannah River Plant. Parties DOE (SRP); State of South Carolina (Department of Health and Environmental Control); US DOJ; Natural Resources Defense Council; Energy Research Foundation; Assistant U.S. Attorney of the District of South Carolina; South Carolina League of Women Voters Date 5/26/1988 SCOPE * Establish guidelines for the closure of certain facilities at the Savannah River Plant: Metallurgical Laboratory Basin, Acid/Caustic Basins, Mixed Waste Management Facility, Seepage Basins, New TXN Basin, Leaking M-Area Storage Tanks. ESTABLISHING MILESTONES * Applicable schedules and deadlines are established in this Consent Decree.

114

Request for Personnel Actions (For Managers and Adminstrative Officers) |  

Broader source: Energy.gov (indexed) [DOE]

Request for Personnel Actions (For Managers and Adminstrative Request for Personnel Actions (For Managers and Adminstrative Officers) Request for Personnel Actions (For Managers and Adminstrative Officers) Headqaurters uses the CHRIS Workflow Tool to submit and process Personnel Actions. There is no longer a need for a hard copy Standard Form-52 (SF-52). Each personnel action is approved via CHRIS workflow and is the official SF-52. All actions must be in the Human Resource office (Personnel Inbox - Step 8) for processing by the Friday before the effective date of the action. All supporting documentation must be attached or this will delay the process, causing the Human Resources Office to change the effective date to the next pay period. The manager or administrative officer must initiate the action in workflow along with assigning approving officials (the same approving

115

Resource Conservation and Recovery Act (RCRA) Part B permit application for Production Associated Units at the Oak Ridge Y-12 Plant  

SciTech Connect (OSTI)

Attention is focused on permit applications for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; and Cyanide Treatment Unit. This report addresses the following areas: facility description; waste characteristics; process information; ground water monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plant, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification.

NONE

1995-05-01T23:59:59.000Z

116

LEDSGP/Transportation Toolkit/Key Actions | Open Energy Information  

Open Energy Info (EERE)

Actions Actions < LEDSGP‎ | Transportation Toolkit Jump to: navigation, search LEDSGP Logo.png Transportation Toolkit Home Tools Training Contacts Key Actions for Low-Emission Development in Transportation Although no single approach or fixed process exists for low-emission development strategies (LEDS), the following key actions are necessary steps for implementing LEDS in the transportation sector. Undertaking these actions requires flexibility to adapt to dynamic societal conditions in a way that complements existing climate and development goals in other sectors. Planners, researchers, and decision-makers should customize this LEDS implementation framework for the specific conditions of their transport sector, choosing from relevant resources to achieve a comprehensive action

117

Resources & Links  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies Smart grid fact sheet Department of...

118

Partnership for Climate Action - China | Open Energy Information  

Open Energy Info (EERE)

Climate Action - China Climate Action - China Jump to: navigation, search Name Partnership for Climate Action - China Agency/Company /Organization Institute for Sustainable Communities (ISC) Partner World Resources Institute (WRI), United States Agency for International Development (USAID) Sector Climate, Energy Focus Area Buildings, Energy Efficiency, Greenhouse Gas, Industry, Land Use Topics Finance, GHG inventory, Implementation, Low emission development planning, Policies/deployment programs Website http://www.iscchina.org/ Program Start 2009 Program End 2013 Country China Eastern Asia References Partnership for Climate Action[1] Overview "The Institute for Sustainable Communities and the World Resources Institute-with funding from USAID and the private sector-have been working

119

Energy Efficiency Resource Standards Resources  

Broader source: Energy.gov [DOE]

Energy efficiency resource standards mandate a quantified energy efficiency goal for an energy provider or jurisdiction within a predetermined timeframe.

120

Category:CETSI Resources | Open Energy Information  

Open Energy Info (EERE)

CETSI Resources CETSI Resources Jump to: navigation, search This page contains a list of all case studies and other resources defined as CETSI Resources. Pages in category "CETSI Resources" The following 43 pages are in this category, out of 43 total. A A Guide to Community Solar: Utility, Private, and Non-profit Project Development An Overview of Existing Wind Energy Ordinances Animal Farm Powers Village Assessment of the Technical Potential for Micro-Cogeneration in Small Commercial Buildings across the United States C Chicago Climate Action Plan City of Aspen Climate Action Plan Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

Tracker Tracker Jump to: navigation, search Tool Summary Name: Climate Action Tracker Agency/Company /Organization: Ecofys Sector: Climate Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual Website: www.climateactiontracker.org/ Climate Action Tracker Screenshot References: Climate Action Tracker[1] "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The website provides an up-to-date assessment of individual national pledges to reduce their greenhouse gas emissions. In the framework of the UNFCCC, many countries have put proposals on the table about how much they intend to reduce their greenhouse-gas emissions in both the near and the long term.

122

Consumer Resources | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Consumer Resources Consumer Resources Consumer Data Apps Challenges Resources About Blogs Let's Talk Feedback Consumer You are here Data.gov » Communities » Consumer Welcome to the resources and press page. Check back frequently for updates. New to Smart Disclosure? Start with our About page Key Federal Smart Disclosure Resources WHITE HOUSE & NATIONAL ARCHIVES Summit on Smart Disclosure 3/30/2012 On March 30, 2012, the White House and the National Archives and Records Administration (NARA), with support from ideas42, hosted a summit on Smart Disclosure - a new tool that helps provide consumers with greater access to the information they need to make informed choices. Click here for agenda. WHITE HOUSE US.National Action Plan on Open Government 9/20/2011 Excerpted commitment on Smart Disclosure: "Promote Smart Disclosure. The

123

TITLE: Engendering Resilience: Building Sustainable Communities through Women's Collective Action  

E-Print Network [OSTI]

TITLE: Engendering Resilience: Building Sustainable Communities through Women's Collective Action in the periphery of Rio de Janeiro, a city known for its expansive urban sprawl, slum communities and environmental basic services and economic opportunities, climate change, pollution and resource degradation

Angenent, Lars T.

124

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

125

STATE OF CALIFORNIA ENERGY RESOURCES CONSERVATION  

E-Print Network [OSTI]

1 STATE OF CALIFORNIA ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION In the Matter of ) ____________________________________) Order No. 10-1201-20 I. AUTHORITY AND PURPOSE Pursuant to Pub. Resources Code, § 25210 and Cal. Code will explore the lessons learned from the Commission's review and action on the solar thermal projects

126

Additional Resources  

Broader source: Energy.gov [DOE]

The following resources are focused on Federal new construction and major renovation projects, sustainable construction, and the role of renewable energy technologies in such facilities. These...

127

Companies agree on climate-change actions  

Science Journals Connector (OSTI)

Companies agree on climate-change actions ... Believing that "for proactive leaders there are major business opportunities in meeting the climate challenge, if the policy environment is right," British Petroleum, General Motors, and Monsanto have joined with the World Resources Institutea Washington, D.C.-based center for environmental policy research-in a broad scheme to reduce greenhouse gas emissions. ...

DAVID HANSON

1998-11-02T23:59:59.000Z

128

Ecofys-Nationally Appropriate Mitigation Actions: Insights from Example  

Open Energy Info (EERE)

Ecofys-Nationally Appropriate Mitigation Actions: Insights from Example Ecofys-Nationally Appropriate Mitigation Actions: Insights from Example Development Jump to: navigation, search Tool Summary LAUNCH TOOL Name: National Appropriate Mitigation Actions: Insights from Example Development Agency/Company /Organization: Ecofys Sector: Energy, Land Topics: Low emission development planning, Policies/deployment programs Resource Type: Lessons learned/best practices Website: www.ecofys.com/com/publications/brochures_newsletters/documents/Report National Appropriate Mitigation Actions: Insights from Example Development Screenshot References: National Appropriate Mitigation Actions: Insights from Example Development[1] "Ecofys elaborated in several projects, concrete examples of NAMAs to understand the issues arising from this concept. This report summarizes the

129

Mobile Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mobile Resources Mobile Resources Mobile Resources Have a mobile device? Find tips and information here. Questions? 505-667-5809 Email For information call the Service Desk at (505) 667-5809 or email mobilelibrary@lanl.gov The following resources are optimized for mobile devices or have mobile apps available for download. Resource Available App Mobile Website Available off Yellow Network with Pairing or Login Additional Information AACR Journals Apple Yes, the Journals are optimized for mobile viewing. Not the whole AACR site. Instructional pdf on pairing with voucher ACS Apple Android No American Institute of Physics Apple No American Mathematical Society No Yes Instructions for pairing mobile devices, tablets, laptops, etc. American Physical Society No Annual Reviews No Yes Instructions for pairing with mobile device available on website.

130

Outcomes Means of Assessment & Criteria / Tasks Results Action for Improvement &  

E-Print Network [OSTI]

Outcomes Means of Assessment & Criteria / Tasks Results Action for Improvement & Documentation of Action for College of Agricultural Sciences & Natural Resources - 2011 Priority 1_Increase Enrollment: 01/01/2011 Assessment Method: 2011 Fall Enrollment in College 05/14/2012 - 2011: 1874 (Goal for 2015

Rock, Chris

131

November 2013 ANALYSIS OF RAW ACTIONS ADDRESSING RFS  

E-Print Network [OSTI]

environmental resource areas for the proposed RAW actions associated with RFS contamination described in SectionNovember 2013 5-1 CHAPTER 5 ANALYSIS OF RAW ACTIONS ADDRESSING RFS CONTAMINATION This chapter discusses the environmental setting, impacts, and mitigation measures for the 14 fully evaluated

Lee, Jason R.

132

Online Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Online Resources Online Resources       General Information Discovering New Physics - Fermilab: where physicists unravel the mysteries of the universe Electromagnetic Simulation: Charged Particle Motion in E/M Field (by Fu-Kwun Hwang, National Taiwan Normal University) Fermilabyrinth - Online versions of exhibits at the Lederman Science Center Fermilab Virtual Tour - Photos of accelerators and detectors with figure captions International Particle Physics Outreach Group (from CERN) Fermilab Homepage - Links to general information, experiments and projects (Fermilab at Work), particle physics (inquiring minds), resources for students (education) and more High-Energy Physics Acronyms - (from Fermilab) Particle Physics - a list of links from the American Physical Society)

133

Estimating Administrative and Procedural Costs Natural Resource Restoration Settlements  

E-Print Network [OSTI]

assessment costs incurred by natural resource trustee agencies (i.e., the federal, state, Indian tribe, and, trustee costs #12;The goal of natural resource damage assessment actions undertaken subsequent to the trustees, or some combination thereof. The damage assessment costs incurred by the natural resource

134

Preventive Action Number:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

135

Center Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources for Planning Center Activities Resources for Planning Center Activities       QuarkNet at Work - Resources Home QuarkNet is a teacher professional development effort funded by the National Science Foundation and the US Department of Energy. Teachers work on particle physics experiments during a summer and join a cadre of scientists and teachers working to introduce some aspects of their research into their classrooms. This allows tomorrow's particle physicists to peek over the shoulder of today's experimenters. These resources are available for lead teachers and mentors at Quartnet Centers as they design activities for associate teacher workshops and follow-on activities. Important Findings from Previous Years Mentor Tips Associate Teacher Institute Toolkit

136

NHMFL Emergency Action Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

137

Tools & Resources: Resource Directory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resource Directory Resource Directory The guidance documents and reports below have been used by Better Buildings Neighborhood Program partners to build their programs and guide them to early successes. The tools and calculators can be used by homeowners, business owners, and program designers to help determine energy savings and other benefits associated with energy efficiency upgrades. Guidance Documents and Reports Background Program Evaluation Program Updates and Lessons Learned Program Design Marketing and Driving Demand Financing and Incentives Workforce Development Partnering with Utilities Technical Resources Tools and Calculators For Homes For Commercial Buildings Emissions and Equivalency Calculators Guidance Documents and Reports Background Recovery Through Retrofit Report

138

US-China Partnership for Climate Action | Open Energy Information  

Open Energy Info (EERE)

US-China Partnership for Climate Action US-China Partnership for Climate Action Jump to: navigation, search Name US-China Partnership for Climate Action Agency/Company /Organization Institute for Sustainable Communities (ISC), World Resources Institute (WRI) Sector Climate, Energy Focus Area Non-renewable Energy, Greenhouse Gas, Industry Topics Background analysis Website http://www.iscvt.org/where_we_ Program Start 2009 Country China, United States Eastern Asia, Northern America References http://www.iscvt.org/where_we_work/china/ "In the fall of 2009, Institute for Sustainable Communities (ISC) launched the US-China Partnership for Climate Action (PCA)[1] with its partner, the World Resources Institute (WRI). This program will leverage resources and best practices from both countries to achieve significant and lasting

139

Actions prioritaires de conservation marine Darwin Darwin Priority Marine Conservation Actions  

E-Print Network [OSTI]

fishing pressure. Key marine biodiversity includes major fishing resources and globally important marine been co-ordinating a UK government funded, Darwin Initiative project for marine biodiversity of Gabon actions needed for the conservation of marine biodiversity in Gabon under the five strategies suggested

Exeter, University of

140

Climate Action Plan (Maryland) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maryland) Maryland) Climate Action Plan (Maryland) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative State/Provincial Govt Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Climate Policies Provider Maryland Department of Natural Resources On April 20, 2007, Governor Martin O'Malley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to address the causes

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

4.0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Broader source: Energy.gov (indexed) [DOE]

0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES 0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES This chapter evaluates the environmental consequences of the proposed action (Section 4.1) and of the alternatives (Section 4.2) . The analysis focuses primarily on impacts associated with routine operation of the glass melter. In some instances (such as human health) , additional analysis is provided for accident conditions. 4.1 THE PROPOSED ACTION The proposed action was evaluated to determine the potential impacts of a number of environmental components, including air quality, surface water quality, and biological resources, as well as the potential effects to human health and safety. The potential impacts to these receptors are evaluated in the following subsections. No impact pathways were identified for land use, socioeconomics, or groundwater resources.

142

Guidance Regarding Actions That May Proceed During the National Environmental Policy Act (NEPA) Process: Interim Actions (6/17/03)  

Broader source: Energy.gov (indexed) [DOE]

Exhibit 3 Exhibit 3 Steps to Follow for Determining Whether Actions May Proceed During the NEPA Process: Interim Actions Would the Interim Action Prejudice the Ultimate Programmatic Decision (i.e., would it tend to determine subsequent development or Limit alternatives)? Is the Proposed Interim Action Within the Scope of a Programmatic or Project-Specific EIS that is Being Prepared? Is the EIS Programmatic in Nature? (If proposed interim action is covered by a CX or EA/FONSI,see footnote 4, page 4, of text) Provisions of 40 CFR 1506.1 Do Not Apply: Follow Normal DOE NEPA Review and Documentation Procedures No Yes No No Would the Interim Action Have An Adverse Impact? Would the Interim Action Limit the Choice of Reasonable Alternatives (e.g., by level of resources

143

Lessons Learned: Creating the Chicago Climate Action Plan | Open Energy  

Open Energy Info (EERE)

Lessons Learned: Creating the Chicago Climate Action Plan Lessons Learned: Creating the Chicago Climate Action Plan Jump to: navigation, search Name Lessons Learned: Creating the Chicago Climate Action Plan Agency/Company /Organization City of Chicago Partner Global Philanthropy Partnership, ICLEI Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Create a Vision, Determine Baseline, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes Topics Low emission development planning Resource Type Lessons learned/best practices Availability Free Publication Date 6/1/2008 Website http://www.chicagoclimateactio Locality Chicago, IL References Lessons Learned: Creating the Chicago Climate Action Plan[1] Overview

144

Strategic Planning -College -Agricultural Sciences & Natural Resources Unit Assessment Report -Four Column  

E-Print Network [OSTI]

Strategic Planning - College - Agricultural Sciences & Natural Resources Unit Assessment Report - Four Column Texas Tech University Priorities Means of Assessment & Criteria / Tasks Results Action & Natural Resources - 2013 Priority 1_Increase Enrollment and Promote Student Success (CASNR - Outcome 1

Zhang, Yuanlin

145

Preventive Action Number:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

146

Corrective and Preventive Action  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Corrective/Preventive Action Process Document Number: P-008 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): P-004 Business System Management Review, F-017 Corrective Action Report Planning Worksheet or F-018 Preventive Action Report Planning Worksheet P-008 Corrective/Preventive Action Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change A Initial Release 08_0310 Implemented Multiple reviewer of "Root Cause" into process. 08_0313 Changed verbiage in Process, Responsibility and Definitions for clarification. Assigned new Backup Document Owner.

147

May 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

148

Climate Change Action in Arizona  

E-Print Network [OSTI]

natural resources and developing renewable energy sources,their energy from renewable resources and/or the purchase offrom the definition of a renewable energy resource. 56. The

Owens, Steve

2009-01-01T23:59:59.000Z

149

Teacher Resource Center: Fermilab Web Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fermilab Web Resources Fermilab Web Resources TRC Home TRC Fact Sheet Library Curricular Resources Science Fair Resources Bibliographies sciencelines The Best of sciencelines Archives Annotated List of URLs Catalog Teacher's Lounge Full Workshop Catalog Customized Workshops Scheduled Workshops Special Opportunities Teacher Networks Science Lab Fermilab Science Materials Samplers Order Form Science Safety Issues Tech Room Fermilab Web Resources The following materials are on the webserver. Fermilab Resources for Students - You might bookmark some of these resources to give your students easy access to information. Fermilab Resources for Students - You might bookmark some of these resources to give your students easy access to information. Photographs and video clips from Fermilab's Visual Media Services

150

Acquisition Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition » Acquisition Acquisition » Acquisition Resources Acquisition Resources Doing Business with DOE/EM Doing Business with DOE/EM EM Procurement Offices Doing Business with EM Consolidated Business Center Guide for Submission of Unsolicated Proposals Federal Business Opportunities Small Business Opportunities EM Major Procurements as of 10/01/13 EM Utility Contracts EM Partnering Initiative: Journey to Excellence Metric No. 3.5 Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management

151

Image Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mosaic of earth and sky images Mosaic of earth and sky images Image Resources Free image resources covering energy, environment, and general science. Here are some links to energy- and environment-related photographic databases. Berkeley Lab Photo Archive Berkeley Lab's online digital image collection. National Science Digital Library (NSDL) NSDL is the Nation's online library for education and research in science, technology, engineering, and mathematics. The World Bank Group Photo Library A distinctive collection of over 11,000 images that illustrate development through topics such as Agriculture, Education, Environment, Health, Trade and more. Calisphere Compiles the digital collections of libraries, museums, and cultural heritage organizations across California, and organizes them by theme, such

152

Teacher Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources Resources Teacher Programs JLab Science Activities for Teachers - An afternoon science program for 5th, 6th and 8th grade teachers. [Program Dates: September 2013 - May 2014] Teacher Night at Jefferson Lab - Teacher Night will be held on April 2nd, 2014. Please sign-up by March 19th, 2014! Education Events Physics Fest - Cryogenics, electricity and more! Reserve your space today! Science Series - Science lectures for high school and middle school students! [Video Archive] Education Events Mailing List - An electronic mailing list to keep you informed of Jefferson Lab's public education events! Workshops and Local Groups The Virginia Section of the American Nuclear Society - Single and multi-day workshops on the science of nuclear energy and radiation.

153

Argentina-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Argentina-Mitigation Action Plans and Scenarios (MAPS) Argentina-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Argentina-Mitigation Action Plans and Scenarios (MAPS) Name Argentina-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Argentina South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

154

Colombia-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Colombia-Mitigation Action Plans and Scenarios (MAPS) Colombia-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Colombia-Mitigation Action Plans and Scenarios (MAPS) Name Colombia-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Colombia South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

155

Worldwide Energy Efficiency Action through Capacity Building and Training  

Open Energy Info (EERE)

Worldwide Energy Efficiency Action through Capacity Building and Training Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Name Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Agency/Company /Organization National Renewable Energy Laboratory, The International Partnership for Energy Efficiency Cooperation Sector Energy Focus Area Energy Efficiency Topics Background analysis Resource Type Training materials Website http://www.nrel.gov/ce/ipeec/w Country Mexico, India UN Region Northern America References Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT)[1] Abstract Included are training materials for the Worldwide Energy Efficiency Action through Capacity Building & Training (WEACT) Workshop in Mexico City, 28-30 September 2010.

156

Brazil-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Brazil-Mitigation Action Plans and Scenarios (MAPS) Brazil-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Brazil-Mitigation Action Plans and Scenarios (MAPS) Name Brazil-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Brazil South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

157

Resource descriptions, ontology, and resource discovery  

Science Journals Connector (OSTI)

Resource discovery systems may assist scientists in the selection of bioinformatics resources suitable to implement scientific workflows. In this paper we address several problems related to resource discovery. They include resource publication formats, resource registration, and syntactic vs. semantic discovery. We analyse the BioMoby registry and present an algorithm that curates the BioMoby hierarchy into an ontology for use in semantic-driven resource discovery.

Zoe Lacroix; Maliha Aziz

2010-01-01T23:59:59.000Z

158

ResourceResource AdequacyAdequacy  

E-Print Network [OSTI]

resources (diesel generators, etc.) Standby Resources Type 2 Buyback provisions on load Modeled in Post Review final assessment Council Power Review final Power Council Approval 7 #12;

159

China-Partnership for Climate Action | Open Energy Information  

Open Energy Info (EERE)

China-Partnership for Climate Action China-Partnership for Climate Action Jump to: navigation, search Name Partnership for Climate Action - China Agency/Company /Organization Institute for Sustainable Communities (ISC) Partner World Resources Institute (WRI), United States Agency for International Development (USAID) Sector Climate, Energy Focus Area Buildings, Energy Efficiency, Greenhouse Gas, Industry, Land Use Topics Finance, GHG inventory, Implementation, Low emission development planning, Policies/deployment programs Website http://www.iscchina.org/ Program Start 2009 Program End 2013 Country China Eastern Asia References Partnership for Climate Action[1] Overview "The Institute for Sustainable Communities and the World Resources Institute-with funding from USAID and the private sector-have been working

160

Resources to reserves  

Science Journals Connector (OSTI)

The resource bases and resources of the various energy forms of natural resources have been discussed. It is now opportune to consider the transformation of resources to reserves. This is effected by explorati...

D. C. Ion

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

October 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Actions 1 Standards Actions 1 New Projects and DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program

162

Standards Actions, July 2002  

Broader source: Energy.gov (indexed) [DOE]

Standards Program Document Status 07-01-2002 Activity Summary In Conversion - 4 In Preparation - 46 Out for Comment - 14 Published this Month - 2 5-year Review Status Revision in Progress - 11 Reaffirmation in Progress - 12 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 19 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Re- cently Sent for Coordination 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- July 2002 Standards Actions DOE Technical Standards Projects Initiated

163

ICDF Complex Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

164

Thermodynamics of resource recycling  

Science Journals Connector (OSTI)

Thermodynamics of resource recycling ... The author applies principles of thermodynamics to analyze the efficiency of resource recycling. ...

W. B. Hauserman

1988-01-01T23:59:59.000Z

165

Characterization of Vadose Zone Sediment: RCRA Borehole 299-E33-338 Located Near the B-BX-BY Waste Management Area  

SciTech Connect (OSTI)

This report summarizes data collected from samples in borehole 299-E33-338 (C3391). Borehole 299-E33-338 was drilled for two purposes. One purpose was for installation of a RCRA ground-water monitoring well and the other was to characterize the in situ soils and background porewater chemistry near WMA B-BX-BY that have been largely uncontaminated by tank farm and crib and trench discharge operations. This borehole was drilled just outside the southeast fence line of the B tank farm. The borehole was drilled between July 23 and August 8, 2001 to a total depth of 80.05 m (275.75 ft) bgs using the cable-tool method (Horton 2002). The water table was contacted at 77.5 m (254.2 ft) bgs and the top of basalt at 82.6 m (271 ft) bgs. Samples to the top of basalt were collected via a drive barrel/splitspoon, before switching to a hard tool to drill 5 feet into the basalt. Nearly continuous core was obtained down to a depth of ~78.6 m (258 ft) bgs. Two hundred and two 2-ft long by 4-in diameter cores were retrieved, which accounts for ~75% the total length of the borehole. Each 2-ft splitspoon contained two 1-ft lexan-lined core segments. The lithology of this borehole was summarized onto a field geologist's log by a CH2M HILL Hanford Group, Inc. geologist (L. D. Walker); subsequently visual inspection of the cores was performed in the laboratory by K. A. Lindsey (Kennedy/Jenks), K. D. Reynolds (Duratek), and B. N. Bjornstad (Pacific Northwest National Laboratory), who also collected 24 samples for paleomagnetic analysis. Subsamples were taken from all 102 cores for moisture content (Table B.1). In addition, 21 core subsamples were collected from a depth of geological interest for mineralogical and geochemical analysis. Data from these samples allow for comparison of uncontaminated versus contaminated soils to better understand the contributions of tank wastes and other wastewaters on the vadose zone in and around WMA B-BX-BY.

Lindenmeier, Clark W.; Serne, R. Jeffrey; Bjornstad, Bruce N.; Gee, Glendon W.; Schaef, Herbert T.; Lanigan, David C.; Lindberg, Michael J.; Clayton, Ray E.; Legore, Virginia L.; Kutnyakov, Igor V.; Baum, Steven R.; Geiszler, Keith N.; Brown, Christopher F.; Valenta, Michelle M.; Vickerman, Tanya S.; Royack, Lisa J.

2003-09-11T23:59:59.000Z

166

Project Management Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance Office of Engineering and Construction Management (OECM) Monthly Project Dashboard Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management Project Definition Rating Index (PDRI) Project Management Institute (PMI) Construction Industry Institute (CII)

167

MITIGATION ACTION PLAN  

Broader source: Energy.gov (indexed) [DOE]

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

168

May 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

169

Interim Action Determination  

Broader source: Energy.gov (indexed) [DOE]

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

170

Corrective Action Program Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

2006-03-02T23:59:59.000Z

171

Fact Sheet - Renewable Resource Integration Action Plan - June...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

have the nation's great- est wind power potential. California has the most installed wind capacity today with more than 2,000 MW already online, according to the American Wind...

172

WATER RESOURCES NEBRASKA WATER RESOURCES RESEARCH INSTITUTE  

E-Print Network [OSTI]

and energy are inextricably bound. Energy is consumed and sometimes produced by every form of water resourcesWATER RESOURCES NEBRASKA WATER RESOURCES RESEARCH INSTITUTE 212 AGRICULTURAL ENGINEERING BUILDING of the National Environmental Policy Act of 1969, water resources professionals squarely faced the fact that water

Nebraska-Lincoln, University of

173

Division of Human Resources University Grievance Procedures  

E-Print Network [OSTI]

Division of Human Resources University Grievance Procedures Employee Relations/ USF System Grievance Procedure Questions: (813) 974-2970 Rev. 12/2012 This procedure applies to Administration, Staff in this procedure are expressed in calendar days. If a deadline falls on a Saturday, Sunday or holiday, an action

Meyers, Steven D.

174

Highland Hospital Human Resources Policy Manual  

E-Print Network [OSTI]

Highland Hospital Human Resources Policy Manual Policy Statements Policy #106 Reviewed: 04/26/12 POLICY: This Policy reaffirms Highland Hospital's commitment to nondiscrimination, equal opportunity, and affirmative action in employment and equal access to and treatment in Hospital programs and activities

Goldman, Steven A.

175

City of Aspen Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Aspen Climate Action Plan Aspen Climate Action Plan Jump to: navigation, search Name City of Aspen Climate Action Plan Agency/Company /Organization City of Aspen Sector Energy, Water, Land Focus Area Buildings, Commercial, Residential, Offsets and Certificates, Economic Development, Goods and Materials - Embodied Energy, Industry - Industrial Processes, Greenhouse Gas, Land Use, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass - Biofuels, Biomass, Geothermal, Water Power, Biomass - Landfill Gas, Solar, - Solar Hot Water, - Solar Pv, Wind Phase Create a Vision, Determine Baseline, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes Resource Type Case studies/examples Availability Free - Publicly Available Publication Date 5/1/2007

176

Driving Transformation to Energy Efficient Buildings:Policies and Actions |  

Open Energy Info (EERE)

Driving Transformation to Energy Efficient Buildings:Policies and Actions Driving Transformation to Energy Efficient Buildings:Policies and Actions Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Driving Transformation to Energy Efficient Buildings:Policies and Actions Agency/Company /Organization: Johnson Controls Sector: Climate, Energy Focus Area: Energy Efficiency Topics: Implementation, Policies/deployment programs Resource Type: Publications Website: www.institutebe.com/ Cost: Free Driving Transformation to Energy Efficient Buildings:Policies and Actions Screenshot References: Driving Transformation to Energy Efficient Buildings:Policies and Actions[1] "The aim of this paper is to review policy options available for policymakers in developing countries that can accelerate energy efficiency improvements in the built environment and track results over time. It

177

Mexico City Climate Action Program | Open Energy Information  

Open Energy Info (EERE)

City Climate Action Program City Climate Action Program Jump to: navigation, search Name Mexico City Climate Action Program Agency/Company /Organization Mexico City Government Topics Implementation, Policies/deployment programs, Pathways analysis, Background analysis Resource Type Guide/manual Website http://www.sma.df.gob.mx/sma/l Country Mexico UN Region Latin America and the Caribbean References Mexico City Climate Action Program[1] Overview "...the aim of the Mexico City Climate Action Program is to contribute to the reduction of greenhouse gas emissions, reduce the vulnerability of the city to the effects of global warming, and heighten our adaptation. To this end, the Program considers related Mexico City government policies and investments that are already in effect; it also identifies and propitiates

178

Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, Rev. No.: 0 with ROTC 1  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada, U.S. Department of Energy, and the U.S. Department of Defense. The general purpose of the investigation is to ensure adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select viable corrective actions. This Corrective Action Investigation Plan provides investigative details for CAU 511, whereas programmatic aspects of this project are discussed in the ''Project Management Plan'' (DOE/NV, 1994). General field and laboratory quality assurance and quality control issues are presented in the ''Industrial Sites Quality Assurance Project Plan'' (NNSA/NV, 2002). Health and safety aspects of the project are documented in the current version of the Environmental Engineering Services Contractor's Health and Safety Plan and will be supplemented with a site-specific safety basis document. Corrective Action Unit 511 is comprised of the following nine corrective action sites in Nevada Test Site Areas 3, 4, 6, 7, 18, and 19: (1) 03-08-02, Waste Dump (Piles & Debris); (2) 03-99-11, Waste Dump (Piles); (3) 03-99-12, Waste Dump (Piles & Debris); (4) 04-99-04, Contaminated Trench/Berm; (5) 06-16-01, Waste Dump (Piles & Debris); (6) 06-17-02, Scattered Ordnance/Automatic Weapons Range; (7) 07-08-01, Contaminated Mound; (8) 18-99-10, Ammunition Dump; and (9) 19-19-03, Waste Dump (Piles & Debris). Corrective Action Sites 18-99-10 and 19-19-03 were identified after a review of the ''1992 RCRA Part B Permit Application for Waste Management Activities at the Nevada Test Site, Volume IV, Section L Potential Solid Waste Management Unit'' (DOE/NV, 1992). The remaining seven sites were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada Test Site Inventory of Inactive and Abandoned Facilities and Waste Sites''. The seven-step data quality objectives (DQO) process was used to identify and define the type, quantity, and quality of data needed to complete the investigation phase of the corrective action process. The DQOs address the primary problem that sufficient information is not available to determine the appropriate corrective action for the CASs. Corrective action closure alternatives (i.e., no further action, close in place, or clean closure) will be recommended for CAU 511 based on an evaluation of all the DQO required data. Under the ''Federal Facility Agreement and Consent Order'', the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives that will be presented in the Corrective Action Decision Document.

David A. Strand

2004-08-01T23:59:59.000Z

179

May 2009 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

May 2009 May 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

180

February 2009 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

February 2009 February 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Standards Actions - April 2002  

Broader source: Energy.gov (indexed) [DOE]

3-28-2002 3-28-2002 Activity Summary In Conversion - 4 In Preparation - 44 Out for Comment - 13 Published this Month - 2 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Canceled 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standards Re- cently Published 2 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- April 2002 Standards Actions DOE Technical Standards Project Canceled

182

July 2009 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

July 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

183

Action-Oriented Benchmarking:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Feb-2008 submitted to Energy Engineering Feb-2008 submitted to Energy Engineering Action-Oriented Benchmarking: Concepts and Tools Evan Mills, Paul Mathew & Mary Ann Piette, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article-Part 1 of a two-part series-we describe an "action-oriented benchmarking" approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful

184

May 2010 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

May 2010 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

185

Standards Actions, May 2002  

Broader source: Energy.gov (indexed) [DOE]

4-29-2002 4-29-2002 Activity Summary In Conversion - 4 In Preparation - 47 Out for Comment - 12 Published this Month - 6 5-year Review Status Revision in Progress - 10 Reaffirmation in Progress - 12 Supersedure in Progress - 0 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 20 Inside this issue: DOE Technical Standards Proposed for Reaffirmation 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- May 2002 Standards Actions DOE Technical Standards Proposed for Reaffirmation The following documents are currently being reevaluated under the 5-year

186

Sixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan  

E-Print Network [OSTI]

are organized by resource areas, Bonneville Power Administration, and Council monitoring activities. In manySixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan Introduction ................................................. 15 Future Role of Bonneville

187

Low-Temperature, Coproduced, and Geopressured Geothermal Technologies Strategic Action Plan, September 2010  

Broader source: Energy.gov [DOE]

This action plan presents an agenda for GTPs Low-Temperature and Coproduced Subprogram to efficiently and effectively leverage its resources in support of the geothermal communitys goals and priorities.

188

Standards Actions, May 2001  

Broader source: Energy.gov (indexed) [DOE]

30-2001 30-2001 Activity Summary In Conversion - 4 In Preparation - 39 Out for Comment - 19 Published this Month - 0 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 23 Cancellation Pending - 9 Cancellation in Progress - 18 No Current Action - 12 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Proposed for Reaffirmation 1 Proposed Cancellation of DOE Technical Standards 2 Published DOE Technical Standards 3 American National Standards Institute 3 American National Standards 6 American Society for Testing and Materials 6 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. May 2001 Standards Actions DOE Technical Standards Projects Initiated

189

Locations Everyone: Lights, Camera, Action!  

Science Journals Connector (OSTI)

Locations Everyone: Lights, Camera, Action! ... Harvard Institute of Proteomics Harvard Medical School ...

Robert F. Murphy; Joshua LaBaer

2008-12-05T23:59:59.000Z

190

EIS-0472: Mitigation Action Plan  

Broader source: Energy.gov [DOE]

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

191

Hiring Reform Memoranda and Action Plan  

Broader source: Energy.gov (indexed) [DOE]

0585 0585 October 7, 2010 MEMORANDUM FOR HEADS OF ALL DEPARTMENTAL ELEMEI\lTS HUMAI\l RESOURCES DIRECTORS FROM: MICHAELC. KANE~~~ CHIEF HUMAN CAPITAL ~ c· SUBJECT: IMPROVING DOE RECRUITMENT AND HIRING PROCESSES This is a follow-up to the Deputy Secretary's Memorandum dated October 6, 2010 where he communicated the need to implement the Action Plan developed to improve the recruitment and hiring processes throughout the Department. One of the central tenets of the President's reform efforts and the Department's Action Plan is management's commitment and attention to an efficient and effective hiring process that yields quality employees. This was clearly articulated in the President's Memorandum dated May 11, 2010 where he directed that management be held accountable through the performance evaluation system for their role

192

Climate Action Planning Tool | Open Energy Information  

Open Energy Info (EERE)

Planning Tool Planning Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate Action Planning Tool Agency/Company /Organization: National Renewable Energy Laboratory Sector: Climate, Energy Focus Area: Renewable Energy, Buildings, Energy Efficiency, Greenhouse Gas, Industry, - Industrial Processes, People and Policy, Transportation Phase: Prepare a Plan, Develop Finance and Implement Projects Resource Type: Guide/manual, Online calculator User Interface: Website Website: www.nrel.gov/applying_technologies/planning_tool/ Web Application Link: www.nrel.gov/applying_technologies/planning_tool/gather_data.cfm Cost: Free Overview This tool is a step by step calculator to find the impact of various technologies to an overall action plan. The target of the tool is research

193

National Action Plan on Demand Response  

Broader source: Energy.gov (indexed) [DOE]

David Kathan, Ph.D David Kathan, Ph.D Federal Energy Regulatory Commission U.S. DOE Electricity Advisory Committee October 29, 2010 Demand Response as Power System Resources The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission 2 Demand Response * FERC (Order 719) defines demand response as: - A reduction in the consumption of electric energy by customers from their expected consumption in response to an increase in the price of electric energy or to in incentive payments designed to induce lower consumption of electric energy. * The National Action Plan on Demand Response released by FERC staff broadens this definition to include - Consumer actions that can change any part of the load profile of a utility or region, not just the period of peak usage

194

Nationally Appropriate Mitigation Actions | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Nationally Appropriate Mitigation Actions Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Nationally Appropriate Mitigation Actions Agency/Company /Organization: United Nations Framework Convention on Climate Change Sector: Energy, Land Focus Area: Energy Efficiency Topics: GHG inventory, Low emission development planning Resource Type: Publications, Lessons learned/best practices, Case studies/examples Website: unfccc.int/home/items/5265.php Country: Afghanistan, Antigua and Barbuda, Armenia, Benin, Bhutan, Botswana, Brazil, Cameroon, Central African Republic, China, Democratic Republic of Congo, Costa Rica, Ivory Coast, Ethiopia, Eritrea, Gabon, Georgia (country), Ghana, India, Indonesia, Israel, Jordan, Madagascar, Maldives, Marshall Islands, Mauritania, Mexico, Mongolia, Morocco, Papua New Guinea, Peru, South Korea, Moldova, San Marino, Sierra Leone, Singapore, South Africa, Republic of Macedonia, Togo, Tunisia

195

Long-Term Stewardship Resource Center | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Long-Term Stewardship Long-Term Stewardship Resource Center Long-Term Stewardship Resource Center WELCOME TO THE DEPARTMENT OF ENERGY'S LONG-TERM STEWARDSHIP RESOURCE CENTER The purpose of this web site is to provide the public and the Department of Energy's (DOE) community with a variety of information resources for long-term stewardship (LTS) responsibilities. LTS includes the physical controls, institutions, information and other mechanisms needed to ensure protection of people and the environment at sites or portions of sites where DOE has completed or plans to complete "cleanup" (e.g., landfill closures, remedial actions, corrective actions, removal actions and facility stabilization) and where legacy contamination will remain hazardous. The DOE's Legacy Management (LM) procedures for DOE sites

196

Climate Action Plan (Vermont) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vermont) Vermont) Climate Action Plan (Vermont) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Climate Policies Provider Vermont Agency of Natural Resources There is a growing scientific consensus that increasing emissions of greenhouse gases to the atmosphere are affecting the temperature and

197

NREL: Renewable Resource Data Center - Biomass Resource Data  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Data The following biomass resource data collections can be found in the Renewable Resource Data Center (RReDC). Current Biomass Resource Supply An estimate of biomass resources...

198

May 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Notices 1 DOE Technical Standards Revisions 1 DOE Technical Standards Projects Initiated 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 04-27-2005 Activity Summary In Conversion - 4 In Preparation - 25

199

Restoration 2013 ACTION PLAN  

E-Print Network [OSTI]

Study Taskforce, Lower Columbia Fish Recovery Board, Lower Columbia Estuary Partnership, National Marine are intended to guide or inform, as appropriate, the Actions Agencies (BPA/Corps), National Marine Fisheries was prepared by the BPA/Corps with review by and collaboration with regional restoration sponsors, researchers

200

Clean Cities: Information Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Information Resources Information Resources Printable Version Share this resource Send a link to Clean Cities: Information Resources to someone by E-mail Share Clean Cities: Information Resources on Facebook Tweet about Clean Cities: Information Resources on Twitter Bookmark Clean Cities: Information Resources on Google Bookmark Clean Cities: Information Resources on Delicious Rank Clean Cities: Information Resources on Digg Find More places to share Clean Cities: Information Resources on AddThis.com... Publications Technical Assistance Information Resources Learn about Clean Cities by exploring these information resources. Publications View Clean Cities-branded publications or search for publications about alternative fuels and vehicles. Technical Assistance Learn about technical assistance available to help organizations overcome

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Information Resources - EERE Commercialization Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Information Resources Site Map Printable Version Share this resource National Laboratories Information Resources Here you will find various informational resources related to the...

202

Resources | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources Resources Machine Control Center Display Jefferson Lab's accelerator is operated from the Machine Control Center. The MCC features a full-wall display that allows...

203

Ombuds Self Help Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Self Help Resources Ombuds Self Help Resources Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact...

204

Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Filter by Audience Filter by Resource Type Solar Powering America supports solar energy use for a variety of stakeholders in the United States. Here you will find resources...

205

Action Plan Agricultural Sciences  

E-Print Network [OSTI]

research for agricultural and forestry interest (nutrition, photosynthesis, enhancements, fruit cultivation stress and crop protection), and the study of farm animal resources (nutrition, production and animal change, energy or water). Institutes and Centres that comprise the Area The Area comprises a total of 17

Fitze, Patrick

206

Climate Change Action in Arizona  

E-Print Network [OSTI]

requirement, including biogas and biomass electricityen- ergy resources (defined as biogas, biomass, geothermal,

Owens, Steve

2009-01-01T23:59:59.000Z

207

August 2001 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

7-31-2001 7-31-2001 Activity Summary In Conversion-4 In Preparation-43 Out for Comment-17 Published this Month-0 5-year Review Status Revision in Progress-6 Reaffirmation in Progress-23 Cancellation Pending-4 Cancellation in Progress-12 Proposed for Cancellation-13 No Current Action-11 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standard Recently Reaffirmed 1 DOE Technical Standards Recently Published 2 American National Standards Institute 2 American National Standards 4 American Society for Testing and Materials 5 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- August 2001 Standards

208

April 2008 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

3-27-2008 3-27-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in March - 0 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ April 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

209

Standards Actions, July 2001  

Broader source: Energy.gov (indexed) [DOE]

6-27-2001 6-27-2001 Activity Summary In Conversion - 4 In Preparation - 42 Out for Comment - 15 Published this Month - 1 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standard Recently Published 1 American National Standards Institute 2 American National Standards 3 American Society for Testing and Materials 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. July 2001 Standards Actions DOE Technical Standards Projects Initiated

210

July 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

6-27-2007 6-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed forReaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/ July 2007 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

211

October 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Publication Staff Roster 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-26-2006 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 16 Published in September - 1 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ October 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access

212

Mitigation Action Plan  

Broader source: Energy.gov (indexed) [DOE]

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

213

February 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Technical Technical Standards Program Document Status 1-18-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 10 Published in January - 3 5-year Review Status Proposed for Revision-6 Revision in Progress-4 Proposed for Reaffirmation-3 Reaffirmation in Progress-21 Cancellation Pending-16 Cancellation in Progress-0 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/ February 2005 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://tis.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

214

Workforce Diversity Action Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

215

July 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

DOE Technical DOE Technical Standards Program Document Status 06-28-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 14 Published in June - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ July 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

216

SAVEnergy Action Plans  

SciTech Connect (OSTI)

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

217

May 2008 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

4-25-2008 4-25-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in April - 2 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ May 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

218

February 2001 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Technical Standards Program Document Status Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ Activity Summary In Conversion - 4 In Preparation - 35 Out for Comment - 18 Published this Month - 1 FY 2001 5-year Reviews Revisions in Progress - 2 Reaffirmations in Progress - 2 Supersedures in Progress - 6 Cancellations Pending - 11 Cancellations in Progress - 33 No Current Action - 16 DOE Technical Standards Project Canceled If you have any questions about this action, please contact the person listed be- low. The following DOE Technical Standards project was recently canceled: * EM Facility Hazard Categorization, Project Number SAFT-0029; EM Technical Standards Manager, John Serocki, 301-903-7999, John.Serocki@em.doe.gov, or Tom Wright, 301-903-3661, Tom.Wright@em.doe.gov. The need for this

219

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

220

February 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

November 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-25-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 16 Published in September - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6

222

November 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

DOE Technical DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Revisions 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association

223

April 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 Technical Standards Published 2 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical

224

April 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

1 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status

225

Take Action to Save Energy at Home | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Residential Buildings » Take Action to Save Energy at Home Residential Buildings » Take Action to Save Energy at Home Take Action to Save Energy at Home Whether you're a home builder or remodeling professional, a homeowner, home buyer, or renter, a state and local government, or a utility, the Buildings Technology Program and the Department of Energy (DOE) have resources to help you take action to save energy. Building or Buying a New Home DOE's Challenge Home helps home buyers find builders who are committed to applying building science and new technologies to create high performance homes. Home builders who want to be recognized for building high performance homes can find out what it takes to participate in DOE's Challenge Home and sign up today. Building America best practice guides and case studies for home builders

226

Career Map: Resource Scientist  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Resource Scientist positions.

227

CLEMSON UNIVERSITY Sustainability Action Plan  

E-Print Network [OSTI]

.......................................................................... 8 Action Steps for Sustainability Education, Culture, and Leadership CLEMSON UNIVERSITY Sustainability Action Plan Submitted by the President's Commission on Sustainability, August 1, 2011 Version 1.0.9 #12; 1 Table of Contents President

Duchowski, Andrew T.

228

Teacher Resource Center: Science Fair Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science Fair Resources Science Fair Resources TRC Home TRC Fact Sheet Library Curricular Resources Science Fair Resources Bibliographies sciencelines The Best of sciencelines Archives Annotated List of URLs Catalog Teacher's Lounge Full Workshop Catalog Customized Workshops Scheduled Workshops Special Opportunities Teacher Networks Science Lab Fermilab Science Materials Samplers Order Form Science Safety Issues Tech Room Fermilab Web Resources The Teacher Resource Center collection is available for use onsite. The TRC is a member of the DuPage Library System. This list was prepared for a presentation to several regional library systems. The Science Fair and Beyond, was presented by Susan Dahl, sdahl@fnal.gov, 630-840-3094. (links checked October 27, 2009) See the 'Customized Workshops" link in the "Teacher's Lounge" for information about more workshops available through the TRC. Explore the Education Office website for other opportunities and services.

229

Environmental Assessment - Proposed Actions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

230

Standards Actions, February 2004  

Broader source: Energy.gov (indexed) [DOE]

1 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standards Recently Published 1 Non-Government Standards 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 5 American Society for Testing and Materials (ASTM) 6 American Nuclear Society (ANS) 11 National Fire Protection Association (NFPA) 12 DOE Technical Standards Program Document Status 01-23-2004 Activity Summary In Conversion - 4 In Preparation - 36 Out for Comment - 23 Published in January - 3 5-year Review Status Revision in Progress - 13 Reaffirmation in Progress - 26 Cancellation Pending - 1 Cancellation in Progress - 3 No Current Action - 0 Inside This Visit the Technical Standards Program

231

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

232

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

233

July 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 06-28-2005 Activity Summary In Conversion - 4 In Preparation - 21 Out for Comment - 10 Published in June - 2 5-year Review Status Proposed for Revision-6 Revision in Progress-3

234

April 2011 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

3009 3009 Revision * DOE Standard 1066 Revision * New DOE Standards Projects * Incidents of Security Concern Technical Standard * Explosives Safety * Operations Assessment Field Handbook * Reporting of Radioactive Sealed Sources Program * Occurrence Reporting Causal Analysis Guide * Nuclear Safety-Related Standards Activity INSIDE THIS ISSUE April 2011 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Standard 3009 Revision The Office of Nuclear Safety Policy and Assistance (HS-21), within the Office of Health, Safety and Security (HSS), conducted workshops in January and March to support a major revision of Department of Energy (DOE) Standard 3009, Preparation Guide for U.S. Department of Energy Nonreactor

235

August 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 07-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

236

October 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-27-2007 Activity Summary In Conversion - 4 In Preparation - 26 Out for Comment - 27 Published in September - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

237

Strategic Action Plan  

Broader source: Energy.gov (indexed) [DOE]

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

238

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

239

April 2005 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Notices 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 1 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 3-28-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 11 Published in March - 0 5-year Review Status Proposed for Revision-6 Revisions in Progress-4 Proposed for Reaffirmation-3 Reaffirmations in Progress-24 Cancellations Pending-11 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards

240

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

August 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 16 Published in July - 2 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0

242

Corrective Action Decision Document/Closure Report for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 232, Area 25 Sewage Lagoons, in accordance with the Federal Facility Agreement and Consent Order. Located at the Nevada Test Site in Nevada, approximately 65 miles northwest of Las Vegas, CAU 232 is comprised of Corrective Action Site 25-03-01, Sewage Lagoon. This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary for CAU 232. The Corrective Action Decision Document and Closure Report have been combined into one report because sample data collected during the July 1999 corrective action investigation (CAI) activities disclosed no evidence of contamination at the site. Contaminants of potential concern (COPCs) addressed during the CAI included total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, total pesticides, total herbicides, total petroleum hydrocarbons (gasoline and diesel/oil range), polychlorinated biphenyls, isotopic uranium, isotopic plutonium, strontium-90, and gamma-emitting radionuclides. The data confirmed that none of the COPCs identified exceeded preliminary action levels outlined in the CAIP; therefore, no corrective actions were necessary for CAU 232. After the CAI, best management practice activities were completed and included installation of a fence and signs to limit access to the lagoons, cementing Manhole No. 2 and the diverter box, and closing off influent and effluent ends of the sewage lagoon piping. As a result of the CAI, the DOE/NV recommended that: (1) no further actions were required; (2) no Corrective Action Plan would be required; and (3) no use restrictions were required to be placed on the CAU.

US Department of Energy Nevada Operations Office

1999-12-23T23:59:59.000Z

243

LEDSGP/Transportation Toolkit/Key Actions/Implement and Monitor | Open  

Open Energy Info (EERE)

Actions/Implement and Monitor Actions/Implement and Monitor < LEDSGP‎ | Transportation Toolkit‎ | Key Actions Jump to: navigation, search LEDSGP Logo.png Transportation Toolkit Home Tools Training Contacts Key Actions for Low-Emission Development in Transportation Although no single approach or fixed process exists for low-emission development strategies (LEDS), the following key actions are necessary steps for implementing LEDS in the transportation sector. Undertaking these actions requires flexibility to adapt to dynamic societal conditions in a way that complements existing climate and development goals in other sectors. Planners, researchers, and decision-makers should customize this LEDS implementation framework for the specific conditions of their transport sector, choosing from relevant resources to achieve a comprehensive action

244

Recommendations on Alternative Actions for Analysis in Site-wide NEPA  

Broader source: Energy.gov (indexed) [DOE]

Recommendations on Alternative Actions for Analysis in Site-wide Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews The purpose o f this memorandum is t o recommend the treatment of the proposed action and the no action alternatives in site-wide National Environmental Pol icy Act (NEPA) reviews that are prepared for continuing and reasonably foreseeable future actions at Department o f Energy (DOE) sites. DOE prepares site-wide NEPA reviews in accordance with section 1021.331 o f the DOE NEPA Regulations (10 CFR Part 1021, published on April 24, 1992 at 57 F R 15122) to improve and coordinate agency plans, functions, programs, and resource utilization, among other reasons. Recommendations on Alternative Actions for Analysis in Site-wide NEPA

245

Teacher Resource Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Teacher Resource Center: Putting It All Together Teacher Resource Center: Putting It All Together TRC Home TRC Fact Sheet Library Curricular Resources Science Fair Resources Bibliographies sciencelines The Best of sciencelines Archives Annotated List of URLs Catalog Teacher's Lounge Full Workshop Catalog Customized Workshops Scheduled Workshops Special Opportunities Teacher Networks Science Lab Fermilab Science Materials Samplers Order Form Science Safety Issues Tech Room Fermilab Web Resources The Teacher Resource Center provides a preview collection of K-12 instructional materials. TRC services include professional development workshops, consultation assistance, bibliographies and reference assistance. Educators have access to curriculum materials, books, multimedia, educational supply catalogs, periodicals and newsletters. The collection

246

Student Resources and Services 433 Student Resources  

E-Print Network [OSTI]

Student Resources and Services 433 Student Resources and Services The University of North Carolina at Charlotte provides a comfortable and enjoyable environment for students that is conducive to studying. The services, facilities, and programs of the University promote individual student development and foster

Xie,Jiang (Linda)

247

Climate Action Plan (North Carolina) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

North Carolina) North Carolina) Climate Action Plan (North Carolina) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Carolina Program Type Climate Policies Provider Department of Environment and Natural Resources The North Carolina Department of Environmental and Natural Resources (DENR)

248

Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.  

SciTech Connect (OSTI)

Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

United States. Bonneville Power Administration.

1992-03-01T23:59:59.000Z

249

Transmission/Resource Library/Enviromental Resources and Mitigation...  

Open Energy Info (EERE)

Enviromental Resources and Mitigation < Transmission | Resource Library(Redirected from TransmissionResource LibraryMitigation) Redirect page Jump to: navigation, search...

250

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Temp Data Fields Matthews, Patrick...

251

Standards Actions - August 2000  

Broader source: Energy.gov (indexed) [DOE]

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

252

February 2013 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

3 3 Standards Actions Technical Standards Program Newsletter U . S . D E PA R T M E N T O F O ffi ce O f nuclear SaFety ENERGY inSide thiS iSSue * Featured DOE Technical Standards Activities * DOE Technical Standards Cost- Savings and Access Improvement Initiative * Domestic and International Nuclear Energy Voluntary Consensus Standards Needs * Nuclear Safety- Related Standards Activity Featured dOe technical StandardS activitieS DOE Technical Standards Cost-Savings and Access Improvement Initiative By Helen Todosow, Brookhaven National Laboratory The Department of Energy (DOE) Technical Standards Managers (TSM) are actively exploring ways to save the government and tax payers' money while at the same time significantly improving efficiencies in access and use of voluntary consensus

253

Standards Actions, April 2000  

Broader source: Energy.gov (indexed) [DOE]

Canceled Canceled The following DOE Technical Standards projects were recently canceled. If you have any questions about this action, please contact the persons listed below. • Accelerated Learning - A Systematic Approach, Project Number 6910-0061; Eula Baldwin, EH-31; 208-526-9472, egb@inel.gov. The need for this document no longer exists. • Environmental Safety and Health Configuration Guide, Project Number FACR-0013; Chan- dra S. Majumdar, EM-23; 301-903-7904, Fax 301-903-4423, Chandra.Majumdar @em.doe.gov. The need for a DOE Technical Standard on this matter no longer exists. • Occupational Safety and Health Handbook, Project Number HFAC-0011; Terry Krietz, EH-51; 301-903-6456, Fax 301-903-2239, Terry.Krietz@hq.doe.gov. The need for this document no longer exists.

254

Standards Actions - May 2000  

Broader source: Energy.gov (indexed) [DOE]

Project Canceled Project Canceled The following DOE Technical Standards project was recently canceled. If you have any questions about this action, please contact the person listed below. • Equipment Qualification Program for DOE-Owned Nuclear Facilities and Operations, Project Number FACR-0012; Samuel Rosenbloom, EH-31; 301-903-5749, Fax 301-903- 8693, Samuel.Rosenbloom@eh.doe.gov. The need for this document no longer ex- ists. DOE Technical Standards Recently Published The following DOE Technical Standard has recently been published: • DOE-STD-1063-2000, Facility Representatives, March 2000. This document updates and supersedes DOE-STD-1063-97, October 1997. DOE employees and DOE contractors may obtain copies from the ES&H Technical Infor- mation Services, U.S. Department of Energy; 1-800-473-4375, Fax 301-903-9823.

255

Standards Actions - January 2000  

Broader source: Energy.gov (indexed) [DOE]

Projects Initiated Projects Initiated The following DOE Technical Standards projects were recently initiated. If you have any questions or are interested in participating in the development of these stan- dards, please contact the per- sons listed below. • Establishing and Maintaining a Facility Representative Pro- gram at DOE Facilities , Project Number MGMT-0003 (revision of DOE-STD-1063-97); David Compton, S-3.1, 202-586-1034, Fax 202-586-3472, David .Compton@hq.doe.gov. • Nuclear Explosive Safety Study Process, Project Number SAFT- 0074 (Revision of DOE-STD- 3015-97); Helmut Filacchione, DP-21, 301-903-7519, Fax 301- 903-8628, Helmut.Filacchione @hq.doe.gov. DOE Technical Standards Project Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact

256

January 2012 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

* DOE Conduct of Operations Standards Revisions * New DOE Standards Projects * DOE Handbook of Operational Safety and Analysis Techniques * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE January 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Conduct of Operations Standards Revisions In the early 1990s, the Department of Energy (DOE) developed 17 technical standards to support DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The standards (STDs), listed below, provided examples, good practices, and expanded explanations of the topics in each chapter of the Order. In June 2010, the Order was revised and issued as DOE Order 422.1, Conduct of Operations. The

257

Guam Energy Action Plan  

SciTech Connect (OSTI)

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

258

Standards Actions - August 2000  

Broader source: Energy.gov (indexed) [DOE]

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

259

Natural Resources Defense Council | Open Energy Information  

Open Energy Info (EERE)

Natural Resources Defense Council Natural Resources Defense Council Jump to: navigation, search NRDC.gif NRDC is an environmental action organization headquartered in New York, New York, using law, science and the support of 1.3 million members and online activists to protect the planet's wildlife and wild places and to ensure a safe and healthy environment for all living things. NRDC was founded in 1970 by a group of law students and attorneys during the environmental movement. NRDC lawyers helped write some of America's environmental laws. Today, NRDC staff has more than 300 lawyers working out of offices in New York, Washington, D.C., Chicago, Illinois, Los Angeles, California, San Francisco, California and Beijing, China. Contact Natural Resources Defense Council 40 West 20th Street New York, NY 10011

260

Solar Resource Assessment  

SciTech Connect (OSTI)

This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

2008-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Reserves and Resources  

Science Journals Connector (OSTI)

Assessments of resources belong to the realm of educated guesses. Conceptually distinct from resources and occupying a higher ranking in regard to precision, certainty and accuracy in mineral resou...

Ooi Jin Bee

1982-01-01T23:59:59.000Z

262

Financial Planning Resource Allocation  

E-Print Network [OSTI]

Financial Planning Resource Allocation Human Resources Administrative Services Recruitment Management Leadership Studies Minor Admissions Information Desk & Game Center Fraternity/Sorority Life & Cross-Cultural Support Board Dining Medical Services Liaison for Faculty, Staff & Scholarships Retail

Barrash, Warren

263

Energy Efficient Radio Resource  

E-Print Network [OSTI]

Energy Efficient Radio Resource Management in a Coordinated Multi-Cell Distributed Antenna System Omer HALILOGLU Introduction System Model Performance Evaluation Conclusion References Energy Efficient Hacettepe University 5 September 2014 Omer HALILOGLU (Hacettepe University) Energy Efficient Radio Resource

Yanikomeroglu, Halim

264

OpenMP Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

some useful OpenMP resources and tutorials: Official OpenMP Web Site: OpenMP standards, API specifications, tutorials, forums, and a lot more other information and resources. Tim...

265

Outdoor Lighting Resources  

Broader source: Energy.gov [DOE]

DOE offers a variety of resources to guide municipalities, utilities, and others in their evaluation of LED street lighting products.

266

World Energy Resources  

Science Journals Connector (OSTI)

World Energy Resources ... Coal reserves are by far the largest proved energy sources we have, said Parker. ...

1954-05-17T23:59:59.000Z

267

DOE - Office of Legacy Management -- Rocky  

Office of Legacy Management (LM)

Rocky Flats Site, Colorado Rocky Flats Site, Colorado A CERCLA and/or RCRA Site rkyflats_2011 Remediation at the Rocky Flats Site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. The site transferred to the Office of Legacy Management in 2008 and requires operation and maintenance of remedial action systems, routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Rocky Flats site, view the fact sheet. Site History Site Documents Community Involvement Contact Us Rocky Flats Benefits Administration Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Record Database

268

DOE - Office of Legacy Management -- Monticello  

Office of Legacy Management (LM)

Utah Utah Monticello, Utah, Disposal and Processing Sites A CERCLA and/or RCRA Site monticello_map Remediation at the Monticello Sites was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. The sites transferred to the Office of Legacy Management in 2003 and require operation and maintenance of remedial action systems, routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Monticello sites, view the fact sheet. Site Documents and Links Contact Us Inspection/Sampling Schedule Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Record Database

269

PACENow Resources | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

PACENow Resources PACENow Resources Provides a broad range of property assessed clean energy resources. Author: PACENow PACENow Website More Documents & Publications Financing...

270

Fisheries Resources | Open Energy Information  

Open Energy Info (EERE)

Fisheries Resources Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleFisheriesResources&oldid612306" Category: NEPA Resources...

271

SPACE RESOURCES ROUNDTABLE IX  

E-Print Network [OSTI]

in developing the resources of space, including the Moon, Mars, asteroids, comets, and other bodies organizations. The ninth Space Resources Roundtable solicits presentations about: · Orbital or landed measurements of the Moon, Mars, and/or asteroids and comets to identify and characterize potential resources

Rathbun, Julie A.

272

Wood Resources International  

E-Print Network [OSTI]

Wood Resources International Wood Raw Material Consumption on the Rise Despite Weak Global Economy UNECE Timber Committee Meeting October 7-8, 2003 Geneva, Switzerland Håkan Ekström Wood Resources International #12;Wood Resources International Outline · Roundwood Removals · Roundwood Consumption · Raw

273

Tools & Resources: Grants Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grants Administration Grants Administration Better Buildings Neighborhood Program award recipients were selected through two competitive funding opportunity announcements (FOA): Energy Efficiency and Conservation Block Grant Program (EECBG): Retrofit Ramp-up and General Innovation Fund Programs (DE-FOA-0000148) State Energy Program (SEP) Special Project: Strengthening Building Retrofit Markets and Stimulating Energy Efficiency Action (DE-FOA-0000251) The U.S. Department of Energy (DOE) selected 34 EECBG recipients and seven SEP recipients in 2010. The 41 Better Buildings award recipients need to comply with DOE and American Recovery and Reinvestment Act of 2009 (ARRA) program regulations and guidance, as described in their award special terms and conditions. DOE has made a number of resources available to help grant recipients administer their programs and comply with federal financial assistance policies and regulations.

274

Statistical Mechanics of Resource Allocation  

E-Print Network [OSTI]

We provide a mathematical model to investigate the resource allocation problem for agents, say, university graduates who are looking for their positions in labor markets. The basic model is described by the so-called Potts spin glass which is well-known in the research field of statistical physics. In the model, each Potts spin (a tiny magnet in atomic scale length) represents the action of each student, and it takes a discrete variable corresponding to the company he/she applies for. We construct the energy to include three distinct effects on the students' behavior, namely, collective effect, market history and international ranking of companies. In this model system, the correlations (the adjacent matrix) between students are taken into account through the pairwise spin-spin interactions. We carry out computer simulations to examine the efficiency of the model. We also show that some chiral representation of the Potts spin enables us to obtain some analytical insights into our labor markets.

Inoue, Jun-ichi

2014-01-01T23:59:59.000Z

275

Ethics to guide environmental action  

Science Journals Connector (OSTI)

Ethics to guide environmental action ... "Environmental Ethics: Choices for Concerned Citizens" is advertised as "a timely guide" for persons wanting "a balanced yet ecologically conscious life-style." ...

1980-12-08T23:59:59.000Z

276

Conservation Conservation ResourcesConservation Resources  

E-Print Network [OSTI]

an inventory of readyMaintain an inventory of ready--toto--constructconstruct coal & wind generation for postConfirm cost & availability of promising resources ­­ Oil sandsOil sands cogencogen, coal gasification, carbon

277

Identify energy-saving actions | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Identify energy-saving actions Identify energy-saving actions Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Provide a seat at the table Share energy goals and progress Identify energy-saving actions Spread the word about how to help

278

Stage 4: Prioritizing and Planning for Actions | Open Energy Information  

Open Energy Info (EERE)

Stage 4: Prioritizing and Planning for Actions Stage 4: Prioritizing and Planning for Actions Jump to: navigation, search Stage 4 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

279

Superfund Record of Decision (EPA Region 4): Ciba-Geigy (McIntosh Plant), AL. (First remedial action), September 1989  

SciTech Connect (OSTI)

The 1,500-acre Ciba-Geigy (McIntosh Plant) site is in southern Washington County, northeast of McIntosh, Alabama. The plant's initial operations, which began in 1952, were devoted solely to the manufacture of DDT. In 1970, the facility expanded its manufacturing operations to include herbicides, insecticides, and chelating and sequestering agents. Other products produced by Ciba-Geigy include resins and additives used in the plastics industry. Wastes and residues generated during production operations were managed onsite. In 1985, EPA issued Ciba-Geigy a RCRA Part B permit for active waste-management units onsite. The permit included a corrective-action plan requiring Ciba-Geigy to remove and treat contaminated ground water and surface water at the site. In 1987, as part of this plan, Ciba-Geigy installed a ground-water pumping and treatment system which has been effective in addressing the ground-water contamination. The primary contaminants of concern affecting the ground-water are VOCs including benzene and toluene; other organics including pesticides; and metals including arsenic.

Not Available

1989-09-28T23:59:59.000Z

280

Action Plan UNIVERSITY OF MISSOURI  

E-Print Network [OSTI]

Energy, Energy Economics and Policy, and Energy-related Commercialization & Business Development. Other, transportation will play a larger role in its greenhouse gas profile. The Climate Action Plan recommends sustain- ability plan. While the initial Climate Action Plan focuses primarily on greenhouse gas emissions

Taylor, Jerry

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network [OSTI]

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

282

Peru-Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information  

Open Energy Info (EERE)

Peru-Mitigation Action Plans and Scenarios (MAPS) Peru-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Peru-Mitigation Action Plans and Scenarios (MAPS) Name Peru-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Peru South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

283

National Action Plan on Demand Response, June 2010 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Action Plan on Demand Response, June 2010 Action Plan on Demand Response, June 2010 National Action Plan on Demand Response, June 2010 The Federal Energy Regulatory Commission (FERC) is required to develop the National Action Plan on Demand Response (National Action Plan) as outlined in section 529 of the Energy Independence and Security Act of 2007 (EISA), entitled "Electricity Sector Demand Response." This National Action Plan is designed to meet three objectives: Identify "requirements for technical assistance to States to allow them to maximize the amount of demand response resources that can be developed and deployed." Design and identify "requirements for implementation of a national communications program that includes broad-based customer education and support."

284

H-Area Hazardous Waste Management Facility Corrective Action Report, Third and Fourth Quarter 1997. Volume 1  

SciTech Connect (OSTI)

SRS monitors groundwater quality at the H-Area HWMF and provides results of this monitoring to the SCDHEC semiannually as required by the RCRA permit. SRS also performs monthly sampling in accordance with Section of the UIC application.

NONE

1998-03-01T23:59:59.000Z

285

EIS-0162: Bonneville Power Administration (BPA) Resource Programs  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Bonneville Power Administration (BPA) developed this programmatic environmental impact statement to support decisions to be made in several future efforts to identify the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers.

286

Mongolia-GTZ Development of RE Resources | Open Energy Information  

Open Energy Info (EERE)

RE Resources RE Resources Jump to: navigation, search Logo: Mongolia-GTZ Development of RE Resources Name Mongolia-GTZ Development of RE Resources Agency/Company /Organization GTZ Partner Ministry of Infrastructure Sector Energy Focus Area Renewable Energy Topics Market analysis, Policies/deployment programs, Background analysis Website http://www.gtz.de/en/praxis/95 Program Start 1998 Program End 2010 Country Mongolia Eastern Asia References Development of renewable energy resources in Mongolia[1] GTZ is working with Mongolia on policy advice as well as technical and commercial management skills of RE enterprises. The objective is to promote the economically efficient use of renewable energy potential in rural areas. The overriding principle determining the action taken here is as

287

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect (OSTI)

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

288

Water resource management planning guide for Savannah River Plant  

SciTech Connect (OSTI)

The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.); Gordon, D.E. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Plant)

1988-10-01T23:59:59.000Z

289

Office of Resource Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resource Management Resource Management Home Sub Offices › Business Operations › Information Management › Human Resources and Administration Mission and Functions HSS Standard Operating Practices (For Internal Users Only) HSS Subject Matter Experts and Functional Points of Contacts Contact Us HSS Logo Office of Resource Management Direct Report to the Chief Health, Safety and Security Officer Mission and Functions Mission The Office of Resource Management supports the infrastructure of the Office of Health, Safety and Security (HSS) by providing balanced, unbiased, technically competent, and customer focused services in the areas of: (1) Financial Management, including budget formulation and execution; (2) Procurement Management, including contract and credit card programs; (3) Information Management, including technology-based solutions and programs; (4) Quality Assurance; (5) Human Resources, including recruitment and retention programs; (6) Administrative Services, including property management, travel, and work space management; and; (7) Strategic and Program Planning including performance and efficiency measures.

290

Contact List, Human Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Human Resources & Occupational Medicine Division Human Resources & Occupational Medicine Division Contact List Human Resources Guest, User, Visitor (GUV) Center Occupational Medicine Training and Qualifications Office Note: All listed phone extensions are in the format of (631) 344-xxxx. Human Resources Robert Lincoln, Chief Human Resources Officer x7435 rlincoln@bnl.gov Margaret Hughes x2108 hughes@bnl.gov Elizabeth Gilbert x2315 gilbert@bnl.gov Human Resources Generalists Christel Colon, HR Manager - BES, GARS & ELS x8469 ccolon@bnl.gov Joann Williams, HR Manager - Support Operations x8356 williamsj@bnl.gov Joanna Hall, HR Manager - Photon Sciences x4410 jhall@bnl.gov Donna Dowling, HR Manager - Nuclear & Particle Physics x2754 dowling@bnl.gov Terrence Buck x8715 tbuck@bnl.gov

291

CMPC Marking Resource  

Broader source: Energy.gov (indexed) [DOE]

June 2012 June 2012 CMPC Marking Resource: Examples of Acceptably Marked Classified Matter June 2012 CMPC Marking Resource Examples of Acceptably Marked Classified Matter June 2012 Prepared for U.S. Department of Energy Office of Health, Safety and Security Office of Security Policy CMPC Marking Resource: Examples of Acceptably Marked Classified Matter June 2012 i FOREWORD A strong and cohesive information security program is integral to national security. The

292

Japanese resource dependence  

SciTech Connect (OSTI)

This thesis is an examination of Japan's strategic resource dependence and her reliance of the three raw materials-rich regions of Southeast Asia (ASEAN), the Persian Gulf, and Southern Africa. A discussion of the Japanese formula for securing resources in the less developed countries of the 'South' is included along with a brief overview of her onshore resource utilization in business/industry. The roles of direct foreign investment, official development assistance, energy conservation, and Japanese multinationalization are discussed.

Sim, R.W.

1982-03-01T23:59:59.000Z

293

Arctic energy resources  

SciTech Connect (OSTI)

The Arctic is a vulnerable region with immense resources. These range from the replenishable (tidal energy, hydroelectricity, wood, biomass, fish, game, and geothermal energy) to the non-replenishable (coal, minerals, natural gas, hydrocarbon deposits). But the problems of exploiting such resources without damaging the environment of the Arctic are formidable. In this book all aspects are considered: occurrence of energy resources; the technological and economic aspects of exploration and exploitation; the environmental and social impact of technological development.

Rey, L.

1983-01-01T23:59:59.000Z

294

Amarillo National Resource Center for Plutonium. Quarterly technical progress report, August 1, 1996--October 31, 1996  

SciTech Connect (OSTI)

This report from the Amarillo National Resource Center for Plutonium describes progress in the following areas: electronic resource library; the senior technical review group; environment, health, and safety and remedial action activities; communications, education, and training; and plutonium and other materials.

NONE

1996-11-26T23:59:59.000Z

295

Post-2014 Resource Allocations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Post-2014 Resource Allocations Post-2014 Resource Allocations On December 17, 2010, Western Area Power Administration's Rocky Mountain Region published its Post-2014 Resource Pool-Loveland Area Projects (LAP), Allocation Procedures and Call for Applications (75 FR 78988). Through the Post-2014 Resource Pool (Resource Pool), Western will allocate up to 1 percent of the LAP long-term firm hydroelectric resource available as of October 1, 2014, that is estimated to be approximately 6.9 megawatts for the summer season and 6.1 megawatts for the winter season. The Resource Pool will be created by reducing existing customers' allocations by up to 1 percent. A public information forum was held on February 2, 2011, prior to the application deadline, which was March 4, 2011. Of the seven applications received, Western determined that six of the applicants met the Resource Pool General Eligibility Criteria. Western published the Resource Pool proposed power allocation and initiated a public comment period in the Federal Register (76 FR 45551, July 29, 2011). A public comment forum on the proposed power allocation was held August 25, 2011, and public comments were due to Western by September 12, 2011. There were no comments received during the public comment period.

296

Geothermal Resources and Technologies  

Broader source: Energy.gov [DOE]

This page provides a brief overview of geothermal energy resources and technologies supplemented by specific information to apply geothermal systems within the Federal sector.

297

Resources | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Learned: Peer Exchange Calls Cost-Effectiveness Tool (Beta Version) Home Energy Advisor Publications Additional Resources DOE Residential Programs Home Energy Pros Online...

298

Environmental Resource Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Resource Management This division delivers science-based engineering solutions to meet regional and national energy, water and other critical environmental...

299

INL Research Library Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and licensed subscriptions to provide the scientific and technical resources needed by INL researchers. Because of license restrictions, many of our subscriptions cannot be...

300

Resources | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources Machine Control Center Display Jefferson Lab's accelerator is operated from the Machine Control Center. The MCC features a full-wall display that allows operators to...

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301
302

LANSCE | Lujan Center | Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Resources The links below describe equipment, laboratories, capabilities, and sample environments that are available to users. Users must plan ahead and specify their needs...

303

Manhattan Project: Resources  

Office of Scientific and Technical Information (OSTI)

web site, a number of additional resources are also provided: Reference Materials Maps Photo Gallery To Learn More Library Suggested Readings Background on this Site About this...

304

ARM - Other Science Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SitesOther Science Resources Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About...

305

Central American resource studies  

SciTech Connect (OSTI)

Los Alamos National Laboratory has been working with five Central American countries to assist in the development of their energy and mineral resources. Since 1985, mineral resources in Costa Rica, peat resources in Costa Rica and Panama, geothermal energy resources in Honduras and Guatemala, and geothermal field development in El Salvador and Costa Rica have been topics of study. This paper presents an overview of this work -- within these proceedings are papers that deal with specific aspects of each topic, and these will be duly noted. 15 refs., 4 figs.

Van Eeckhout, E.; Laughlin, A.W.

1989-01-01T23:59:59.000Z

306

NETL: Natural Gas Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources Significant volumes of natural gas can also be produced from tight (low permeability) sandstone reservoirs and coal seams, both unconventional reservoir rocks. NETL...

307

Energy Resource Potential  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resource Potential Resource Potential of Methane Hydrate Energy Resource Potential An introduction to the science and energy potential of a unique resource Disclaimer Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.

308

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network [OSTI]

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

309

Action Item Review and Status  

Broader source: Energy.gov (indexed) [DOE]

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

310

Do good actions inspire good actions in others?  

E-Print Network [OSTI]

Actions such as sharing food and cooperating to reach a common goal have played a fundamental role in the evolution of human societies. These good actions may not maximise the actor's payoff, but they maximise the other's payoff. Consequently, their existence is puzzling for evolutionary theories. Why should you make an effort to help others, even when no reward seems to be at stake? Indeed, experiments typically show that humans are heterogeneous: some may help others, while others may not. With the aim of favouring the emergence of 'successful cultures', a number of studies has recently investigated what mechanisms promote the evolution of a particular good action. But still little is known about if and how good actions can spread from person to person. For instance, does being recipient of an altruistic act increase your probability of being cooperative with others? Plato's quote, 'Good actions give strength to ourselves and inspire good actions in others', suggests that is possible. We have conducted an e...

Capraro, Valerio

2014-01-01T23:59:59.000Z

311

Idaho HWMA/RCRA Closure Plan for Idaho Nuclear Technology and Engineering Center Tanks WM-182 and WM-183 - Rev. 2  

SciTech Connect (OSTI)

This document presents the plan for the closure of the Idaho Nuclear Technology and Engineering Center Tank Farm Facility tanks WM-182 and WM-183 in accordance with Idaho Hazardous Waste Management Act/Resource Conservation and Recovery Act interim status closure requirements. Closure of these two tanks is the first in a series of closures leading to the final closure of the eleven 300,000-gal tanks in the Tank Farm Facility. As such, closure of tanks WM-182 and WM-183 will serve as a proof-of-process demonstration of the waste removal, decontamination, and sampling techniques for the closure of the remaining Tank Farm Facility tanks. Such an approach is required because of the complexity and uniqueness of the Tank Farm Facility closure. This plan describes the closure units, objectives, and compliance strategy as well as the operational history and current status of the tanks. Decontamination, closure activities, and sampling and analysis will be performed with the goal of achieving clean closure of the tanks. Coordination with other regulatory requirements, such as U.S. Department of Energy closure requirements, is also discussed.

Evans, Susan Kay; unknown

2000-12-01T23:59:59.000Z

312

ICDF Complex Remedial Action Report  

SciTech Connect (OSTI)

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

313

Recapping National Energy Action Month  

Broader source: Energy.gov [DOE]

Energy Department officials spent National Energy Action Month on the road, meeting and learning from Americans who are advancing our energy security, growing the economy and protecting the environment.

314

Physics Resources for Teachers  

E-Print Network [OSTI]

Physics Resources for Teachers University of Wisconsin ­ Madison Department of Physics 1150 University Ave. Madison, WI 53706 wonders@physics.wisc.edu (608) 262-2927 Plasma Physics Web Resources Center Plasma Physics Lab http://science-education.pppl.gov/ Coalition for Plasma Science http

Collar, Juan I.

315

STUDENT EMPLOYMENT HUMAN RESOURCES  

E-Print Network [OSTI]

STUDENT EMPLOYMENT HUMAN RESOURCES GUIDELINE Human Resources | One Washington Square | San José, CA 95192-0046 | 408-924-2250 408-924-2284 (fax) SUBJECT: STUDENT EMPLOYMENT DATE: March 2007 I. PURPOSE / DESCRIPTION Student employees are defined as matriculated students that work part-time in any

Gleixner, Stacy

316

Operating System Resource Management  

E-Print Network [OSTI]

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location allocation and de-allocation by an operating system of processor cores, memory pages, and various types constrained. This talk will propose a scheme for addressing the operating system resource management problem

317

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network [OSTI]

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

318

Teacher Resource Kit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Teacher Resource Kit Teacher Resource Kit This kit is designed as a resource for teachers who teach grades K-5. It is intended to provide information about the Laboratory and our education resources and to introduce activities that may be useful in the classroom. The kit contains information about the Laboratory's history and current research activities. You will find information applicable to various grade levels that can be tailored to the grade level that you currently teach. Also included are materials and activities that have been obtained from sources outside the Laboratory. Requesting support from Los Alamos National Laboratory The Laboratory and its employees consider it their responsibility to devote resources to improving the quality of life

319

Tri-Lab Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tri-Lab Resources Tri-Lab Resources Tri-Lab Computing Resources Computing resources available to Alliance users as of January 2012. Computing resources available Los Alamos Moonlight - 294 compute nodes, 4,704 cores, 488 TF system. Dual 8-core Intel Xeon (Sandy Bridge) processors with two NVIDIA Tesla GPUs per node, w/ InfiniBand. Mustang - 1,600 compute nodes, 38,400 cores, 353 TF system. 24-core AMD Opteron w/ InfiniBand. Mapache - 592 compute nodes, 4,736 cores, 50.4 TF system. SGI XE1300 dual-socket, quad-core Intel Nehalem processors w/ InfiniBand. Pinto - 154 compute nodes, 2,464 cores, 51.3 TF system. Dual 8-core Intel Xeon (Sandy Bridge) processors w/ Infiniband. Lawrence Livermore Cab - 1,296 nodes, 20,736 cores, 333-TF system. Dual 8-core Intel Xeon (Sandy Bridge) processors w/ InfiniBand. Additional information at Cab

320

World Resources Institute Feed | Open Energy Information  

Open Energy Info (EERE)

World Resources Institute Feed World Resources Institute Feed Jump to: navigation, search Home | About | Inventory | Partnerships | Capacity Building | Webinars | Reports | Events | News | List Serve CLEAN Member Feeds Center for Environment and National Security at Scripps Centro de Energías Renovables (CER) The Children's Investment Fund Foundation (CIFF) Climate and Development Knowledge Network (CDKN) Climate Technology Initiative (CTI) ClimateWorks Foundation Coalition for Rainforest Nations (CfRN) Ecofys Energy Research Centre of the Netherlands (ECN) Energy Sector Management Assistance Program of the World Bank (ESMAP) Environment and Development Action in the Third World (ENDA-TM) German Aerospace Center (DLR) German Agency for International Cooperation (GIZ) Global Village Energy Partnership (GVEP)

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Corrective Action Investigation Plan for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 335, Area 6 Injection Well and Drain Pit, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 335 consists of three Corrective Action Sites (CASs). The CAU is located in the Well 3 Yard in Area 6 at the Nevada Test Site. Historical records indicate that the Drain Pit (CAS 06-23-03) received effluent from truck-washing; the Drums/Oil Waste/Spill (CAS 06-20-01) consisted of four 55-gallon drums containing material removed from the Cased Hole; and the Cased Hole (CAS 06-20-02) was used for disposal of used motor oil, wastewater, and debris. These drums were transported to the Area 5 Hazardous Waste Accumulation Site in July 1991; therefore, they are no longer on site and further investigation or remediation efforts are not required. Consequently, CAS 06-20-01 will be closed with no further action and details of this decision will be described in the Closure Report for this CAU. Any spills that may have been associated with this CAS will be investigated and addressed under CAS 06-20-02. Field investigation efforts will be focused on the two remaining CASs. The scope of the investigation will center around identifying any contaminants of potential concern (COPCs) and, if present, determining the vertical and lateral extent of contamination. The COPCs for the Drain Pit include: total volatile/ semivolatile organic compounds, total petroleum hydrocarbons (gasoline-and diesel-range organics), ethylene glycol monobutyl ether, polychlorinated biphenyls, total Resource Conservation and Recovery Act metals, and radionuclides. The COPCs for the Cased Hole include: total volatile/ semivolatile organic compounds, total petroleum hydrocarbons (diesel-range organics only), and total Resource Conservation an d Recovery Act metals. Both biased surface and subsurface soil sampling will be conducted, augmented by visual inspection, video surveys, and electromagnetic surveys. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

DOE/NV

2000-12-01T23:59:59.000Z

322

Sandia National Laboratories: International Smart Grid Action...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Smart Grid Action Network Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration,...

323

Energy Agency Coordinators for Energy Action Month  

Broader source: Energy.gov [DOE]

Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

324

Affirmative Action and Equal Opportunity  

E-Print Network [OSTI]

RELIGIOUS ACCOMMODATION SECTION NINE FORMAL GRIEVANCE DEADLINES SECTION TEN RESOURCES #12;INTRODUCTION­24 25­29 SECTION ONE INTRODUCTION TO THE OAAEO SECTION TWO OAAEO CONSTITUENTS SECTION THREE FACULTY MEMBERS, DIRECTORS, AND SUPERVISORS: RESPONSIBILITY AND ASSISTANCE SECTION FOUR DEFINITIONS RELATED

Oregon, University of

325

Corrective Action Decision Document for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 254, R-MAD Decontamination Facility, under the Federal Facility Agreement and Consent Order. Located in Area 25 at the Nevada Test Site in Nevada, CAU 254 is comprised of Corrective Action Site (CAS) 25-23-06, Decontamination Facility. A corrective action investigation for this CAS as conducted in January 2000 as set forth in the related Corrective Action Investigation Plan. Samples were collected from various media throughout the CAS and sent to an off-site laboratory for analysis. The laboratory results indicated the following: radiation dose rates inside the Decontamination Facility, Building 3126, and in the storage yard exceeded the average general dose rate; scanning and static total surface contamination surveys indicated that portions of the locker and shower room floor, decontamination bay floor, loft floor, east and west decon pads, north and south decontamination bay interior walls, exterior west and south walls, and loft walls were above preliminary action levels (PALs). The investigation-derived contaminants of concern (COCs) included: polychlorinated biphenyls, radionuclides (strontium-90, niobium-94, cesium-137, uranium-234 and -235), total volatile and semivolatile organic compounds, total petroleum hydrocarbons, and total Resource Conservation and Recovery Act (Metals). During the investigation, two corrective action objectives (CAOs) were identified to prevent or mitigate human exposure to COCs. Based on these CAOs, a review of existing data, future use, and current operations at the Nevada Test Site, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Unrestricted Release Decontamination and Verification Survey; and Alternative 3 - Unrestricted Release Decontamination and Verification Survey and Dismantling of Building 3126. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors, and the preferred CAA chosen on technical merit was Alternative 2. This CAA was judged to meet all requirements for the technical components evaluated and applicable state and federal regulations for closure of the site, and reduce the potential for future exposure pathways.

U.S. Department of Energy, Nevada Operations Office

2000-06-01T23:59:59.000Z

326

Ecofys-How to get Nationally Appropriate Mitigation Actions (NAMAs) to work  

Open Energy Info (EERE)

Ecofys-How to get Nationally Appropriate Mitigation Actions (NAMAs) to work Ecofys-How to get Nationally Appropriate Mitigation Actions (NAMAs) to work Jump to: navigation, search Tool Summary LAUNCH TOOL Name: How to get Nationally Appropriate Mitigation Actions (NAMAs) to work Agency/Company /Organization: Ecofys Sector: Energy, Land Topics: Low emission development planning, Pathways analysis Resource Type: Guide/manual Website: prod-http-80-800498448.us-east-1.elb.amazonaws.com/w/images/4/49/Ecofy How to get Nationally Appropriate Mitigation Actions (NAMAs) to work Screenshot References: How to get Nationally Appropriate Mitigation Actions (NAMAs) to work[1] "This short paper identifies three types of issues as potential obstacles for NAMAs in this early stage of development. First, it highlights the importance of dealing with local ownership, which is quite time intensive.

327

Bottom Up and Country Led: A New Framework for Climate Action | Open Energy  

Open Energy Info (EERE)

Bottom Up and Country Led: A New Framework for Climate Action Bottom Up and Country Led: A New Framework for Climate Action Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Bottom Up and Country Led: A New Framework for Climate Action Agency/Company /Organization: Booz and Company Sector: Energy, Land, Climate Topics: Low emission development planning Resource Type: Publications Website: www.booz.com/global/home/what_we_think/reports_and_white_papers/ic-dis Cost: Free Bottom Up and Country Led: A New Framework for Climate Action Screenshot References: Bottom Up and Country Led: A New Framework for Climate Action[1] "As delegates gather for the Climate Change Conference in Cancun in late 2010, they can benefit from familiarizing themselves with the set of tools available for mitigation and adaptation, as well as how these tools can fit

328

Monitoring and Tracking Long-Term Finance to Support Climate Action | Open  

Open Energy Info (EERE)

Monitoring and Tracking Long-Term Finance to Support Climate Action Monitoring and Tracking Long-Term Finance to Support Climate Action Jump to: navigation, search Tool Summary Name: Monitoring and Tracking Long-Term Finance to Support Climate Action Agency/Company /Organization: Organisation for Economic Co-Operation and Development (OECD) Sector: Energy, Climate Topics: Finance, GHG inventory Resource Type: Publications, Lessons learned/best practices Website: www.oecd.org/dataoecd/57/57/48073739.pdf Cost: Free Monitoring and Tracking Long-Term Finance to Support Climate Action Screenshot References: Monitoring and Tracking Long-Term Finance to Support Climate Action[1] "This paper highlights the relevant information that needs to be tracked in order to build a comprehensive MRV system for climate finance, proposing

329

Division of Human Resources Human Resources / Attendance and Leave Philosophy  

E-Print Network [OSTI]

Division of Human Resources PHILOSOPHY Human Resources / Attendance and Leave Philosophy Form Leave Act (FMLA). USF augments these provisions with local processes and philosophies and, in some cases

Meyers, Steven D.

330

Definition: Corrective Action Plan | Open Energy Information  

Open Energy Info (EERE)

Corrective Action Plan Corrective Action Plan Jump to: navigation, search Dictionary.png Corrective Action Plan A list of actions and an associated timetable for implementation to remedy a specific problem.[1] View on Wikipedia Wikipedia Definition Corrective action and preventive action (CAPA, also called corrective action / preventive action) are improvements to an organization's processes taken to eliminate causes of non-conformities or other undesirable situations. CAPA is a concept within good manufacturing practice (GMP). It focuses on the systematic investigation of the root causes of non-conformities in an attempt to prevent their recurrence (for corrective action) or to prevent occurrence (for preventive action). Corrective actions are implemented in response to customer complaints,

331

RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM DOE/CX-00128  

Broader source: Energy.gov (indexed) [DOE]

8 8 I. Project Title: Washington River Protection Solutions LLC - Small-Scale Mercury Spill Cleanup under TSCA/ RCRA under CX 86.1, ncleanup Actions" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will engage in short-term, small-scale mercury clean-up actions in accordance with the Toxic Substance Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). WRPS will perform all activities in accordance with all applicable regulations and procedures. Clean-up actions will not exceed ten million dollars and will be done when needed to reduce or eliminate adverse impacts

332

National Geothermal Resource Assessment and Classification |...  

Broader source: Energy.gov (indexed) [DOE]

Geothermal Resource Assessment and Classification National Geothermal Resource Assessment and Classification National Geothermal Resource Assessment and Classification presentation...

333

A National Resource  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

National Resource National Resource for Industry Manufacturing DeMonstration facility As the nation's premier research laboratory, Oak Ridge National Laboratory is one of the world's most capable resources for transforming the next generation of scientific discovery into solutions for rebuilding and revitalizing America's manufacturing industries. These industries call upon ORNL's expertise in materials synthesis, characterization, and process technology to reduce risk and accelerate the development and deployment of innovative energy-efficient manufacturing processes and materials targeting products of the future. The Department of Energy's first Manufacturing Demonstration Facility (MDF), established at ORNL, helps industry adopt new manufacturing technologies to reduce life-cycle energy and

334

Practical Action | Open Energy Information  

Open Energy Info (EERE)

Action Action Jump to: navigation, search Logo: Practical Action Name Practical Action Address The Schumacher Centre for Technology & Development, Bourton on Dunsmore, Rugby, Warwickshire Place Rugby, Warwickshire Zip CV21 1UB Phone number 01926 634400 Notes Practical Action works alongside communities to find practical solutions to the poverty they face. Website http://www.practicalaction.org Coordinates 52.3910875°, -1.2339112° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.3910875,"lon":-1.2339112,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

335

Additional Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Additional Resources Additional Resources Additional Resources October 16, 2013 - 4:36pm Addthis The following resources are focused on Federal new construction and major renovation projects, sustainable construction, and the role of renewable energy technologies in such facilities. These resources are organized by: Resource Guides Renewable Energy Planning Planning Construction Operations and Maintenance Commissioning Sample Plans and Documents Resource Guides Whole Building Design Guide (WBDG) WBDG: New Construction and Major Renovation Guiding Principles (WBDG) Leadership in Energy and Environmental Design (LEED) New Construction and Major Renovation Reference Guide Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers

336

Resource Program (pbl/main)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RegDialogue Implementation Regional Dialogue (Post-2006) Subscription Contracts IOUPublic Settlement Slice of the System Billing Procedures Resource Program Firstgov BPA Resource...

337

Developer Resources | Department of Energy  

Office of Environmental Management (EM)

Developer Resources Developer Resources Apps for Energy Apps for Energy The Energy Department is challenging developers to use the Green Button data access program to bring...

338

Sandia National Laboratories: Wind Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EnergyWind Resources Wind Resources Comments are closed. Renewable Energy Wind Energy Wind Plant Optimization Test Site Operations & Maintenance Safety: Test Facilities Capital...

339

Wind Career Map: Resource List  

Broader source: Energy.gov [DOE]

The following resources were used in the development of the Wind Career Map, associated job profile information, or are potential resources for interested Wind Career Map viewers.

340

Information Resources | Department of Energy  

Energy Savers [EERE]

Information Resources Information Resources Learn about hydrogen and fuel cells, find publications and technical information, view and download multimedia, read presentation...

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Pathway and Resource Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pathway and Resource Overview Pathway and Resource Overview Delivering Renewable Hydrogen Workshop - A Focus on Near-Term Applications Mark F. Ruth November 16, 2009 Palm Springs, CA NREL/PR-6A1-47108 National Renewable Energy Laboratory Innovation for Our Energy Future Definition and Presentation Outline Hydrogen pathway analysis is analysis of the total levelized cost (including return on investment), well-to- wheels (WTW) energy use, and WTW emissions for hydrogen production, delivery, and distribution pathways. This presentation focuses on * Pathway analyses using the Macro-System Model (MSM) * Resource and pathway analysis using the Hydrogen Demand and Resource Analysis Tool (HyDRA) * Status of water-electrolysis technology

342

TEMPORARY SUPPORT HUMAN RESOURCES  

E-Print Network [OSTI]

TEMPORARY SUPPORT HUMAN RESOURCES GUIDELINE Workforce Planning | One Washington Square | San José of the Request for Temporary Support, Workforce Planning will make a determination of the type of temporary

Su, Xiao

343

Resource Adequacy INTRODUCTION  

E-Print Network [OSTI]

whether there are sufficient non-hydro resources available to meet loads when the "fuel" for hydroelectric the amount of water for hydroelectric generation) and temperature (which affects the demand for electricity

344

Human Resource Management Delegation  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The notice is to clarifies and updates existing Human Resource Management Delegation Authorities and the levels to which they are delegated. Expired 6-28-97. Does not cancel any directives.

1996-06-28T23:59:59.000Z

345

Human Resources & Rebecca Leinen  

E-Print Network [OSTI]

Human Resources & Training Rebecca Leinen SafetyInformation Systems Chris Smeds Work Management Mark Webb Energy & Utilities Cheryl Gomez Operations & Maintenance Cheryl Gomez, interim Systems Services Delta Force Recycling Sustainability Outreach Office for Sustainability Utility Systems Power

Acton, Scott

346

Climate VISION: Private Sector Initiatives: Electric Power: Resources and  

Office of Scientific and Technical Information (OSTI)

Power Partners Resource Guide Power Partners Resource Guide The Power PartnersSM Resource Guide (PPRG) is a Web-based resource developed to help electric power companies undertake a wide range of actions to reduce, avoid, or sequester greenhouse gas (GHG) emissions and/or reduce emissions intensity. The PPRG is designed to help companies identify GHG emission or emission intensity reduction opportunities and find the latest, "state-of-the-art" information on a variety of topic areas through the use of links to credible Websites. The Guide also creates a dialogue between people implementing projects and those wanting to learn, by allowing companies to contribute information and establish points of contact for information on successful projects. The PPRG features sections on the following area of

347

Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources  

Broader source: Energy.gov (indexed) [DOE]

Blackout 2003: Energy Secretary Bodman and Minister of Natural Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report, October 3, 2006 Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report, October 3, 2006 Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report. In accordance with the mandate of the U.S.-Canada Power Outage Task Force, the report outlines all of the actions taken to prevent or minimize the likelihood of future blackouts, reduce the scope of those that do occur and improve the security of the North American electric power grid. Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn

348

Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources  

Broader source: Energy.gov (indexed) [DOE]

Blackout 2003: Energy Secretary Bodman and Minister of Natural Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report, October 3, 2006 Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report, October 3, 2006 Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report. In accordance with the mandate of the U.S.-Canada Power Outage Task Force, the report outlines all of the actions taken to prevent or minimize the likelihood of future blackouts, reduce the scope of those that do occur and improve the security of the North American electric power grid. Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn

349

Wind Resource Maps (Postcard)  

SciTech Connect (OSTI)

The U.S. Department of Energy's Wind Powering America initiative provides high-resolution wind maps and estimates of the wind resource potential that would be possible from development of the available windy land areas after excluding areas unlikely to be developed. This postcard is a marketing piece that stakeholders can provide to interested parties; it will guide them to Wind Powering America's online wind energy resource maps.

Not Available

2011-07-01T23:59:59.000Z

350

CLIMATE ACTION PLAN JUNE 1, 2010  

E-Print Network [OSTI]

UC DAVIS 2009­2010 CLIMATE ACTION PLAN JUNE 1, 2010 #12;UC Davis 2009-2010 Climate Action Plan Page 2 UC DAVIS 2009-2010 CLIMATE ACTION PLAN TABLE OF CONTENTS Acknowledgements...................................................................................................... 24 Chapter 3: Emissions Reduction Actions 3.1 Energy Use Reduction to Date

Schladow, S. Geoffrey

351

Universitt Potsdam, 21.11.2013 Marie Sklodowska Curie Actions in  

E-Print Network [OSTI]

Societal Challenges 1. Health, demographic change and wellbeing 2. Food security, sustainable agriculture, marine and maritime and inland water research and bioeconomy 3. Secure, clean and efficient energy 4. Smart, green and integrated transport 5. Climate action, environment, resource efficiency and raw

Potsdam, Universität

352

Demonstration of Shibboleth in Action across a Range of Security focused Grid Projects  

E-Print Network [OSTI]

Demonstration of Shibboleth in Action across a Range of Security focused Grid Projects Prof. R. O of the critical factors to the success of Grid technologies is ease of use. To encourage wider uptake, the access to large scale computational and data resources such as the National Grid Service (NGS) (www

Glasgow, University of

353

Kelly Scientific Resources Kelly Scientific Resources yy BIOTECHNOLOGY DRUG &  

E-Print Network [OSTI]

Kelly Scientific Resources Kelly Scientific Resources yy BIOTECHNOLOGY DRUG & PHARMACEUTICAL · What Kelly Scientific Resources or staffing agencies are and how they work?they work? · How to work Role: ­ Northern California Recruiting and Business efforts for Kelly Scientific Resources ­ Promote

Puglisi, Joseph

354

Strategic moves: Where can you put your waste?  

SciTech Connect (OSTI)

The Corrective Action Management Unit/Treatment Unit (CAMU/TU) rule allows effective remediation by providing less stringent regulations for various types of waste management activities under the Resource Conservation and Recovery Act (RCRA) corrective action process. At the same time, the rule includes important restrictions to protect public health and the environment. It should be noted that other existing requirements, policies and guidelines for site-specific remediation goals remain in effect for sites subject to RCRA corrective action. The primary impact of this rule is the ability to place, and subsequently treat waste from an on-site area in a designated CAMU, without necessitating compliance with land disposal restrictions (LDRs) and minimum technology requirements (MTRs). It also allows for existing closed and/or closing RCRA regulated land-based units such as surface impoundments, wastepiles or landfills to be designated as CAMUs, in order to enhance the management of remediation waste. The TU rule allows TUs to be used for short term treatment in the management of remediation wastes. The criteria used must be protective of public health and the environment. In a majority of cases, however, when a TU is designated it is already operating under RCRA requirements, so modification to the standards is not necessarily required.

Abbasi, R.A.

1995-11-01T23:59:59.000Z

355

Corrective Action Investigation Plan for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. 0)  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites for sludge from septic tanks located in Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern are the same for the disposal pits and include: volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPHs) as gasoline- and diesel-range organics, polychlorinated biphenyls, Resource Conservation and Recovery Act metals, and radionuclides (including plutonium and depleted uranium). The Battery Dump Site consists of discarded lead-acid batteries and associated construction debris, placing the site in a Housekeeping Category and, consequently, no contaminants are expected to be encountered during the cleanup process. The corrective action the at this CAU will include collection of discarded batteries and construction debris at the Battery Dump Site for proper disposal and recycling, along with photographic documentation as the process progresses. The corrective action for the remaining CASs involves the collection of background radiological data through borings drilled at undisturbed locations near the area of the disposal pits; field screening samples for radiological constituents; analysis for geotechnical/hydrologic parameters of samples beneath the disposal pits; and bioassessment samples, if VOC or TPH contamination concentrations exceed field-screening levels. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

DOE/NV

2000-10-05T23:59:59.000Z

356

Transformational Energy Action Management (TEAM) Wireless Energy Efficiency Keys Initiative  

Broader source: Energy.gov (indexed) [DOE]

by by Transformational Energy Action Management (TEAM) Wireless Energy Efficiency Keys Initiative *Ways of Using Wireless Technology to Help You Reduce Energy Usage at your Facility Together with our industry partners, we strive to: * Accelerate adoption of the many energy-efficient technologies and practices available today * Conduct vigorous technology innovation to radically improve future energy diversity, resource efficiency, and carbon mitigation * Promote a corporate culture of energy efficiency and carbon management What Is the Industrial Technologies Program ? The Industrial Technologies Program (ITP) is the lead federal agency responsible for improving energy efficiency in the largest energy-using sector of the country. Industrial Sector National Initiative

357

National Action Programmes on Desertification | Open Energy Information  

Open Energy Info (EERE)

Programmes on Desertification Programmes on Desertification Jump to: navigation, search Name National Action Programmes on Desertification Agency/Company /Organization United Nations Convention to Combat Desertification Sector Land Focus Area Forestry, Agriculture Topics Co-benefits assessment, GHG inventory, Policies/deployment programs, Background analysis Resource Type Publications Website http://www.unccd.int/actionpro Country Algeria, Benin, Botswana, Burkina Faso, Burundi, Cameroon, Cape Verde, Chad, Democratic Republic of Congo, Djibouti, Egypt, Equatorial Guinea, Eritrea, Ethiopia, Gabon, Gambia, Ghana, Guinea, Kenya, Lesotho, Madagascar, Malawi, Mali, Mauritania, Morocco, Mozambique, Namibia, Niger, Nigeria, Senegal, South Africa, Sudan, Swaziland, Tanzania, Togo, Tunisia, Uganda, Zambia, Zimbabwe

358

Know the symptoms. Take action.  

E-Print Network [OSTI]

1 " " Know the symptoms. Take action. heart attack c a l l Don't Take a Chance With a Heart Attack: Know the Facts and Act Fast More than 1 million people in the United States have heart attacks each attack happens, delay in treatment can be deadly. Learn the warning symptoms of a heart attack, and know

Bandettini, Peter A.

359

Know the symptoms. Take action.  

E-Print Network [OSTI]

heart attack Know the symptoms. Take action. c a l l Important Information Fill out the next two:____________________________ Home phone:_______________________ Work phone: ________________________ December 2011 #12;Heart Attack might be having heart attack symptoms or a heart attack, call 9­1­1 immediately. Don't ignore your pain

Bandettini, Peter A.

360

CLIMATE ACTION PLAN SEPTEMBER 2009  

E-Print Network [OSTI]

· ALBUQUERQUE, NEW MEXICO #12;#12;The University of New Mexico is committed to reducing energy usage and ourCLIMATE ACTION PLAN SEPTEMBER 2009 UNIVERSITY OF NEW MEXICO · OFFICE OF SUSTAINABILITY ................................ 18 C. Electricity Recommendation #1 Solar........... 21 D. Electricity Recommendation #2 Smart Grid

Maccabe, Barney

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Climate Action Champions Informational Webinar  

Broader source: Energy.gov [DOE]

An informational webinar will be held on Thursday, Oct. 9 from 1:00 p.m. - 3:00 p.m. Eastern Standard Time (EST) to provide applicants with an overview of the Climate Action Champions opportunity, the application process, and answer any questions.

362

Compromise strategies for action selection  

Science Journals Connector (OSTI)

...10.1098/rstb.2007.2051 Howard, R 1977Risk preferenceIn Readings in decision analysisMenlo Park, CA:SRI International Humphrys, M. 1996 Action selection methods using reinforcement learning. PhD thesis, University of Cambridge...

2007-01-01T23:59:59.000Z

363

Thailand-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Thailand-The Mitigation Action Implementation Network (MAIN) Thailand-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Thailand-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

364

Uruguay-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Uruguay-The Mitigation Action Implementation Network (MAIN) Uruguay-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Uruguay-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

365

Dominican Republic-The Mitigation Action Implementation Network (MAIN) |  

Open Energy Info (EERE)

Dominican Republic-The Mitigation Action Implementation Network (MAIN) Dominican Republic-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Dominican Republic-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

366

Costa Rica-The Mitigation Action Implementation Network (MAIN) | Open  

Open Energy Info (EERE)

Costa Rica-The Mitigation Action Implementation Network (MAIN) Costa Rica-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Costa Rica-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

367

Pakistan-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Pakistan-The Mitigation Action Implementation Network (MAIN) Pakistan-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Pakistan-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

368

Mexico-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Mexico-The Mitigation Action Implementation Network (MAIN) Mexico-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Mexico-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

369

Colombia-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Colombia-The Mitigation Action Implementation Network (MAIN) Colombia-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Colombia-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

370

Philippines-The Mitigation Action Implementation Network (MAIN) | Open  

Open Energy Info (EERE)

Philippines-The Mitigation Action Implementation Network (MAIN) Philippines-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Philippines-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

371

China-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

China-The Mitigation Action Implementation Network (MAIN) China-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name China-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

372

The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Mitigation Action Implementation Network (MAIN) Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

373

Panama-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Panama-The Mitigation Action Implementation Network (MAIN) Panama-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Panama-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

374

Malaysia-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Malaysia-The Mitigation Action Implementation Network (MAIN) Malaysia-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Malaysia-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

375

Peru-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Peru-The Mitigation Action Implementation Network (MAIN) Peru-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Peru-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

376

Vietnam-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Vietnam-The Mitigation Action Implementation Network (MAIN) Vietnam-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Vietnam-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

377

Brazil-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Brazil-The Mitigation Action Implementation Network (MAIN) Brazil-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Brazil-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

378

Chile-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Chile-The Mitigation Action Implementation Network (MAIN) Chile-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Chile-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

379

India-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

India-The Mitigation Action Implementation Network (MAIN) India-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name India-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

380

Indonesia-The Mitigation Action Implementation Network (MAIN) | Open Energy  

Open Energy Info (EERE)

Indonesia-The Mitigation Action Implementation Network (MAIN) Indonesia-The Mitigation Action Implementation Network (MAIN) Jump to: navigation, search Name Indonesia-The Mitigation Action Implementation Network (MAIN) Agency/Company /Organization Center for Clean Air Policy (CCAP) Partner ICI, Environment Canada, BP, World Bank Institute, Thailand, Ministry of Energy Thailand, Ministry of Industry Thailand, Ministry of Natural Resources and Environment Thailand, Pollution Control Department, Ministry of Natural Resources and Environment Philippines, Climate Change Commission Philippines, Department of Environment and Natural Resources Vietnam, Ministry of Planning and Investment Vietnam, Sub-Institute of Hydrometeorology and Environment of South Vietnam, Ministry of Industry and Trade Vietnam, Ministry of Finance Indonesia, Ministry of Public Works Indonesia, Ministry of Transport Indonesia, Dept. of Clean & Efficient Energy Technology Implementation Indonesia, National Council on Climate Change Malaysia, Ministry of Natural Resources and Environment Malaysia, Dept. of Economic Planning Malaysia, Ministry of Green Technology, Energy and Water Malaysia, Land Public Transport Commission India, Central Electricity Regulatory Commission Pakistan, Dept. of Planning & Development Pakistan, Ministry of Finance Pakistan, Ministry of Foreign Affairs Pakistan, Ministry of Water and Power Germany, Federal Environment Ministry Argentina, Ministry of Energy Argentina, Ministry of Industry Chile, Ministry of Environment Chile, Ministry of Energy Chile, Ministry of Transport Chile, Ministry of Finance Colombia, Ministry of Environment Colombia, Ministry of Transport Colombia, Department of National Planning Colombia, Ministry of Housing Costa Rica, Climate Change Direction Costa Rica, Ministry of Agriculture Costa Rica, Ministry of Housing Costa Rica, Ministry of Energy Dominican Republic, National Climate Change Commission Dominican Republic, National Energy Commission Dominican Republic, Ministry of Environment and Natural Resources Dominican Republic, Ministry of Economy, Planning and Development Dominican Republic, Technical Office for Land Transport (OTTT) Panama Canal Authority Panama Maritime Authority Peru, Ministry of Environment Peru, Ministry of Energy and Mines Peru, Ministry of Transport and Communications Peru, Ministry of Energy and Mines Uruguay, Ministry of the Environment Uruguay, National Transport Directorate Uruguay, Ministry of Industry, Energy and Minerals Uruguay, Ministry of Agriculture Canada, Ministry of the Environment Norway, Ministry of the Environment Sweden, Department of the Environment UK, Department for Energy and Climate Change (DECC), Danish Government

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Natural Resource Management Plan Update  

E-Print Network [OSTI]

Natural Resource Management Plan Update Tim Green Environmental Protection Division Community. Cultural Resources) · Focus on gaining better understanding of site resources · Began or continued managing · Monitoring layers · Cultural Resources ­ WW I, WW II, CCC GIS used for planning ­ NSLS II, LISF, Permits, etc

Homes, Christopher C.

382

The Resources Agency of California  

E-Print Network [OSTI]

· Department of Forestry & Fire Protection · Department of Parks & Recreation · Department of Water Resources

383

Energy Resources for Tornado Season  

Office of Energy Efficiency and Renewable Energy (EERE)

Learn about the Office of Energy Efficiency and Renewable Energy's resources for post-tornado recovery.

384

Energy Resources for Hurricane Season  

Broader source: Energy.gov [DOE]

Learn about the Office of Energy Efficiency and Renewable Energy's resources for post-hurricane recovery.

385

Natural Resource Management Plan for Brookhaven National Laboratory  

SciTech Connect (OSTI)

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

green, T.

2011-08-15T23:59:59.000Z

386

Raw materials resources  

Science Journals Connector (OSTI)

Mineral resources continue to play an essential role in the world economy: industrial economies depend on the availability of sources of energy and metals; the wealth of some countries is liable to fluctuate in response to variations over time in the price of the resources extracted. Predictions made early in the 1970s of exhaustion of resources of important minerals, e.g. lead and zinc, have proved to be mistaken, and from the viewpoint of the late-1980s it seems likely that total world consumption of mineral resources will continue to rise. A continuation is expected of the trend for an increased proportion of ores being converted into end-products in the country of extraction. In the highly industrialized countries the importance of mineral resources will tend to decrease relative to total manufactured goods and services, and the demand for imported minerals will decrease as other minerals are substituted and more metals are recycled. Developing countries which export raw minerals will be adversely affected because the prices of the minerals that they sell will rise more slowly than the prices for manufactured goods that they import.

Martin Kursten; Georg Bluemel; Lothar Lahner; Helmut Schmidt

1990-01-01T23:59:59.000Z

387

Action  

National Nuclear Security Administration (NNSA)

and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http: www,nrc.govreading-rmadams.htmI. Persons who do not have access to...

388

Water Resources Center Annual Technical Report  

E-Print Network [OSTI]

research effort is resource development. As market prices for natural resources (gold, oil, lumber, other

389

Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Resources Resources Resources About one in every four federal employees is a military Veteran. At the Department of Energy, 19 percent of our workforce is made up of veterans. Veterans, their spouses, and dependent children are eligible for a variety of benefits provided by the Federal government. Some of these benefits are connected with service disabilities; others depend on amount of time served and in what capacity. Regardless, any Veteran seeking employment with a Federal agency should be aware of the many employment and work-life assistance programs that are available. Employment Information What is Veterans Preference Eligibility? Read more about employment eligibility for Veterans by visiting the Veterans Preference Eligibility page at FedsHireVets.gov. What are Special Hiring Authorities? To learn about the hiring authorities

390

Relocation Guide, Human Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Relocation Information Guide Relocation Information Guide The Human Resources Division is providing this Information Guide to you to help ease the transition of relocating to Long Island. Relocating to a new place can be an exciting as well as stressful time. We have compiled information that can be very helpful with the many issues you may face. You may also seek assistance from the recruiter you work with in Human Resources. Service Disclaimer - This web page contains links to other Internet sites. These links are not endorsements of any products or services and no information in such site has been endorsed or approved by Brookhaven National Laboratory or the Human Resources Division. Here are some of the issues: Cost of living Buying or renting a home Schools in the area

391

Internal Resources Home  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Budget Budget Proposals Human Resources Administration Internal Resources Administration--Includes an Administrative Services Directory and an A-Z index. Budget - Contacts Employee Talent Profile System--A system, launched by Jay Keasling in late 2012, populated with profiles of both scientists and non-scientists, meant to be a resource for the creation of teams across the Biosciences Area and the persue of collective funding opportunities both internal and external to the Laboratory. Complete your profile and look for more system enhancements in the coming year. Equipment List (viewable by Berkeley Lab staff only) -- A list of equipment used in the Life Sciences Division. Several equipment needs training prior to use, therefore, please always contact the person responsible if interested in using the equipment. If listed as a contact on

392

Establishing Regional Resource Centers  

Wind Powering America (EERE)

Establishing Regional Resource Centers Establishing Regional Resource Centers July 25, 2013 Coordinator: Welcome and thank you for standing by. At this time all participants are in a listen only mode. To ask a question later during the question and answer session please press star then 1 on your touchtone phone. Today's conference is being recorded. If you have any objections you may disconnect. And I would like to turn it over to Mr. Jonathan Bartlett. Sir, you may begin. Jonathan Bartlett: Thank you very much. This is Jonathan Bartlett from the Department of Energy's Wind and Water Power Technologies Office. Today's WPA Webinar will be on the subject of establishing regional resource centers. I will be joined by Ian Baring-Gould at the National Renewable Energy Laboratory and the

393

Teacher and General Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne Argonne Science Project Ideas! Our Teacher and General Resources section provides you with online aids for learning about science, such as a tutorial of science equipment, as well as guides for the metric system. Please select any item below that interests you. Also, if you have an idea for a great teacher resource that we could share, please click our Ideas page. We would love to hear from you! Science Equipment Resources: Online Basic Laboratory Equipment Information An Introduction to Basic Laboratory Equipment All students need to know and understand the function of the equipment that they will be using in the science classroom. This exercise is to help students know a beaker from a bunsen burner! TSwift MB 3200 Microscope Online Tutorial Online Microscope Tutorial

394

Laboratory Computing Resource Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computing DOE Logo Computing DOE Logo Search BIO ... Search Argonne Home > BIO home > Laboratory Computing Resource Center BIO Home Page About BIO News Releases Research Publications People Contact Us Organization Chart Site Index Inside BIO BIO Safety About Argonne Argonne National Laboratory Logo Laboratory Computing Resource Center In 2002 Argonne National Laboratory established the Laboratory Computing Project to enable and promote the use of high-performance computing (HPC) across the Laboratory in support of its varied research missions. The Laboratory Computing Resource Center (LCRC) was established, and in April 2003 LCRC began full operations with Argonne’s first teraflops computing cluster, Jazz. In 2010 Jazz was replaced by Fusion, with a peak performance of 30 teraflops (and still growing). We just acquired Blues which will a performance of 100 teraflops.

395

Resources: ADEPS: LANL Inside  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ADEPS Resources ADEPS Resources ADEPS Facilities & Institutes Institute for Multiscale Materials Studies (IMMS) Materials Design Institute Milagro Gamma-Ray Observatory Quantum Institute (QI) Superconductivity Technology Center (STC) Trident Laser Facility Weapons Neutron Research Facility (WNR) ADEPS Science News LA Science, LANSCE Special Edition #30 (pdf) MPA Matters Physics research in the news Materials research highlights Materials facilities and capabilities Materials research in the news Conferences & Meetings Lujan Seminar Series MS Cookies and Tea PT Colloquium Quantum Lunch National User Facilities Center for Integrated Nanotechnologies (CINT) Los Alamos Neutron Science Center (LANSCE) National High Magnetic Field Laboratory (NHMFL) Professional Societies & National Academies

396

Emergencies and Emergency Actions | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Emergencies and Emergency Actions Emergencies and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. September 8, 2005 Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina;

397

National Action Plan on Demand Response  

Broader source: Energy.gov (indexed) [DOE]

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

398

The Standards Actions, October 1996  

Broader source: Energy.gov (indexed) [DOE]

Actions Actions October 1996 Documents Recently Published The following DOE documents have recently been published: * DOE-SPEC-3018-96, Flooded-Type Lead-Acid Storage Batter- ies, August 1996. * DOE-SPEC-3019-96, Valve- Regulated Type Lead-Acid Storage Batteries, August 1996. * DOE-TSL-1-96, Department of Energy Standards Index, August 1996. * DOE-TSL-4-96, Directory of DOE and Contractor Personnel Involved in Non-Government Standards Activities, August 1996. DOE employees and DOE contractors may obtain copies from the DOE Office of Scientific and Technical Information (OSTI), P.O. Box 62, Oak Ridge, Tennes- see 37831; telephone 423-576-8401 or FAX 423-576-2865. Subcontractors and the general public may obtain copies from the U.S. Department of Commerce, Technology Administration,

399

AGENCY: ACTION: DEPARTMENT OF ENERGY  

Broader source: Energy.gov (indexed) [DOE]

ACTION: ACTION: DEPARTMENT OF ENERGY Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 Naval Petroleum and Oil Shale Reserves U.S. Department of Energy (DOE) Finding of No Significant Impact (FONSI) for the Transfer of Naval Petroleum Reserve No. 3 (DOE/EA-1236) SUMMARY: The Secretary of Energy is authorized to produce the Naval Petroleum Reserves No. 3 (NPR-3) at its maximum efficient rate (MER) consistent with sound engineering practices, for a period extending to Apr115 2000 subject to extension. Production at NPR-3 peaked in 1981 and has declined since until it has become a mature stripper field, with the average well yielding less than 2 barrels per day. The Department of Energy (DOE) has decided to discontinue Federal operation of NPR-3 at the end of its life

400

The Standards Actions, January 1996  

Broader source: Energy.gov (indexed) [DOE]

Actions Actions Resistance of HVAC Air Ducts and Fittings (new standard); comments due February 6, 1996. * ISO/ASQC A3534-1, Statis- tics - Vocabulary and Sym- bols - Probability and Gen- eral Statistical Terms (new standard); comments due January 26, 1996. * ISO/ASTM/ASQC/NSF 14004, Environmental management systems - General guidelines on principles, systems and Technical Standards Program Document Status as of 12/31/95 Documents Recently Published The Technical Standards Program is sponsoring a project at OSTI to place all DOE technical standards (i.e., standards and handbooks) on the Internet. To date, 57 DOE technical standards have been placed on the Internet at the following address: http://apollo.osti.gov/ html/techstds/ techstds.html The following DOE technical standards have recently

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Action Sheet 36 Final Report  

SciTech Connect (OSTI)

Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

Kips, R E; Kristo, M J; Hutcheon, I D

2012-02-24T23:59:59.000Z

402

Comparing Double String Theory Actions  

E-Print Network [OSTI]

Aimed to a deeper comprehension of a manifestly T-dual invariant formulation of string theory, in this paper a detailed comparison between the non-covariant action proposed by Tseytlin and the covariant one proposed by Hull is done. These are obtained by making both the string coordinates and their duals explicitly appear, on the same foot, in the world-sheet action, so "doubling" the string coordinates along the compact dimensions. After a discussion of the nature of the constraints in both the models and the relative quantization, it results that the string coordinates and their duals behave like "non-commuting" phase space type coordinates but their expressions in terms of Fourier modes generate the oscillator algebra of the standard bosonic string formulation. A proof of the equivalence of the two formulations is given. Furthermore, open-string solutions are also discussed.

Luca De Angelis; S. J. Gabriele Gionti; Raffaele Marotta; Franco Pezzella

2013-12-27T23:59:59.000Z

403

Microsoft Word - CXPosticp10001.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 SECTION A. Project Title: MFC - EBR-II Sodium Removal/RCRA Closure Activities SECTION B. Project Description The proposed action will remove the sodium from the Experimental Breeder Reactor (EBR)-II piping system and tanks to achieve clean-closure for eventual decommissioning, deactivation and demolition (DD&D). The clean-closure will be completed in compliance with the EBR-II Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Storage and Treatment Permit PER-120. EBR-II is located at the Materials and Fuels Complex at the Idaho National Laboratory. The EBR-II DD&D actions will be addressed under the Comprehensive Environmental Response Compensation, and Liability Act, specifically, the Engineering Evaluation/Cost Analysis for the EBR-II End State (DOE/ID-11398) and Action Memorandum.

404

Canada Calls for Triclosan Action  

Science Journals Connector (OSTI)

Canada Calls for Triclosan Action ... The Canadian government is urging industry to voluntarily remove the antibacterial chemical triclosan from consumer products because of concerns about its toxicity to aquatic organisms. ... Although triclosan can still be sold and used in Canada in products such as antibacterial soaps, toothpastes, and deodorants, the government plans to work with companies over the next 18 months to better understand usage patterns and to assess alternatives. ...

BRITT ERICKSON

2012-04-09T23:59:59.000Z

405

Take the Energy Action Challenge  

K-12 Energy Lesson Plans and Activities Web site (EERE)

Students will work in pairs or small groups to apply knowledge of energy-wise habits to evaluate energy use in their homes and schools and make recommendations for improved efficiency. They will use an energy audit tool to collect data on their home and school energy habits and present an action plan to their class. Further communication at the school and district level is encouraged.

406

Spherical Pendulum, Actions, and Spin  

Science Journals Connector (OSTI)

To fill this gap, our research group has worked out energy surfaces in action variable representation, for a number of classical problems:? the Euler, Lagrange, and Kovalevskaya cases of rigid body dynamics,8-10 billiards in ellipsoids,11,12 and particle motion around point masses with Schwarzschild or Kerr metric as well as around two fixed centers. ... These tori are mirror images of each other under the spin transformation P. ...

Peter H. Richter; Holger R. Dullin; Holger Waalkens; Jan Wiersig

1996-12-05T23:59:59.000Z

407

Riverland expedited response action proposal  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

408

FTCP FY09 Operational Plan GOAL 2 Objectives and Actions  

Broader source: Energy.gov (indexed) [DOE]

Federal Technical Capability Program Federal Technical Capability Program FY 2009 Operational Plan Preserve and Enhance Technical Capability Action Plan F F E E D D E E R R A A L L T T E E C C H H N N I I C C A A L L C C A A P P A A B B I I L L I I T T Y Y P P R R O O G G R R A A M M F F Y Y 2 2 0 0 0 0 9 9 O O P P E E R R A A T T I I O O N N A A L L P P L L A A N N GOAL 2: Preserve and Enhance Technical Capability * Champions: Dave Chaney, NNSA Service Center and Larry Kelly, Oak Ridge Office Objectives/Actions Identify Resource and Organizational Structure Needs to Improve Qualification Consistency and Transportability * Champion: Allen Tate, SSO * Determine appropriate resource levels * Determine effective organizational structure Establish an Effective Mid-Level Recruitment Program * Champions:Sean Clayton, HQ HC-13 and Barry Weaver, ETS * Benchmark existing programs

409

Vietnam-Integrated Action Plan to Reduce Vehicle Emissions | Open Energy  

Open Energy Info (EERE)

Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Jump to: navigation, search Name Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Agency/Company /Organization Asian Development Bank Focus Area Transportation Topics Implementation, Policies/deployment programs, Background analysis Resource Type Guide/manual Website http://www.adb.org/documents/o Program Start 2002 Country Vietnam UN Region South-Eastern Asia References Vietnam-Integrated Action Plan to Reduce Vehicle Emissions[1] Background "A major goal of this strategy is to reduce mobile sources of air pollution in Viet Nam's largest cities. According to this strategy, industry, business units, management agencies and the transport sector must carefully control pollutant emissions such as carbon monoxide (CO), carbon dioxide

410

North American Energy Ministers Take Further Action on Energy Security and  

Broader source: Energy.gov (indexed) [DOE]

Ministers Take Further Action on Energy Ministers Take Further Action on Energy Security and the Environment North American Energy Ministers Take Further Action on Energy Security and the Environment July 23, 2007 - 2:55pm Addthis Joint Communiqué VICTORIA - Energy ministers for Canada, Mexico and the United States took another step toward enhancing North American energy security and environmental protection, announcing concrete actions on energy science and technology, energy efficiency, deployment of clean energy technologies and other cooperative projects. The North American energy ministers met in Victoria, B.C., today where the Honourable Gary Lunn, Minister of Natural Resources, hosted his counterparts Ms. Georgina Kessel, Secretary of Energy for Mexico, and U.S. Secretary of Energy Samuel W. Bodman.

411

CDKN-Kenya-Action Plan for National Climate Change Response Strategy | Open  

Open Energy Info (EERE)

Kenya-Action Plan for National Climate Change Response Strategy Kenya-Action Plan for National Climate Change Response Strategy Jump to: navigation, search Name CDKN-Kenya-Action Plan for National Climate Change Response Strategy Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment and Mineral Resources on behalf of the National CC Task Force, HTSPE, IDLA, LTS International/ ACCLIMATISE, IISD, Adam Smith International +subcontractors Sector Climate, Energy, Land Topics Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/2011/04/an-act Program Start 2010 Program End 2012 Country Kenya UN Region Eastern Africa References CDKN-Kenya-Action Plan for National Climate Change Response Strategy[1]

412

Geothermal Heat Pumps: Market Status, Barriers to Adoption, and Actions to  

Open Energy Info (EERE)

Geothermal Heat Pumps: Market Status, Barriers to Adoption, and Actions to Geothermal Heat Pumps: Market Status, Barriers to Adoption, and Actions to Overcome Barriers Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Geothermal Heat Pumps: Market Status, Barriers to Adoption, and Actions to Overcome Barriers Agency/Company /Organization: Oak Ridge National Laboratory Sector: Energy Focus Area: Renewable Energy, Geothermal Topics: Market analysis, Technology characterizations Resource Type: Guide/manual Website: www.ornl.gov/sci/ees/etsd/btric/pdfs/geothermal_report_12-08.pdf References: Geothermal Heat Pumps: Market Status, Barriers to Adoption, and Actions to Overcome Barriers[1] Overview "This brief study was undertaken at DOE's request to address this conundrum. The scope included determining the status of global GHP markets

413

Arkansas Water Resources Center  

E-Print Network [OSTI]

Keywords --Algal Assay/Nutrients/Heavy Metals/Toxicity #12;TABLE OF CONTENTS Page Abstract. i ListArkansas Water Resources Center ALGAL GROWTH POTENTIALS AND HEAVY METAL CONCENTRATIONS) demonstrated the probable inhibition of algal growth potential by heavy metals in upper Beaver Lake. Upper

Soerens, Thomas

414

Engineering and Mineral Resources  

E-Print Network [OSTI]

News ????????????????? ® College of Engineering and Mineral Resources Winter 2008 table of contents. . . . . . . . . . . . . . . . . . . . 7 wvCROSSROADS DepartmentofCivilandEnvironmentalEngineering Civil engineering exchange program and environmental engineering with a focus in transportation will have the opportunity to study abroad as part

Mohaghegh, Shahab

415

ResourceBounded Information  

E-Print Network [OSTI]

Query Input l Word processing package for aMac. l $200 price limit. l Search process should take 10 min Features l Active search and discovery. l Resource Bounded Reasoning. l Goal­driven and) C (75% 6) (25% 4) enables Subtask Relation Enables NLE Q = Quality D = Duration C = Cost Task

Raja, Anita

416

Poster Resources Poster Planning  

E-Print Network [OSTI]

Poster Resources Poster Planning � Discovery Day: Tips for Successful Posters by University of South Carolina Office of Undergraduate Research � Creating Effective Poster Presentations by George Hess, Kathryn Tosney, Leon Liegel http://www.ncsu.edu/project/posters/NewSite/index.html � How to Write

Almor, Amit

417

Semantic resource framework  

Science Journals Connector (OSTI)

The Semantic Resource Framework (SRF) is a multi-level description of the data sources for search computing applications. It responds to the need of having a structured representation of search services, amenable to service exploration, selection, and ... Keywords: ontology, search services, semantic annotation, service description, service repository

Marco Brambilla; Alessandro Campi; Stefano Ceri; Silvia Quarteroni

2011-01-01T23:59:59.000Z

418

LIBRARY RESOURCES FOR FACULTY  

E-Print Network [OSTI]

LIBRARY RESOURCES FOR FACULTY #12;Meet Us Pictured here are just a few of the people at the University of Toronto Libraries who support teaching, learning and research every day. Come in and say hello, Information Technology Services and OCUL Scholars Portal staff, Library Instruction, Information Commons Help

419

Water Resources Policy & Economics  

E-Print Network [OSTI]

Water Resources Policy & Economics FOR 4984 Selected Course Topics · Appropriative and riparian water institutions · Incentives for conservation · Water rights for in-stream environmental use · Surface water-groundwater management · Water quality regulations · Water markets · Economic and policy

Buehrer, R. Michael

420

Integrating NRDA and CERCLA environmental evaluations at the Rocky Flats Plant: A case study  

SciTech Connect (OSTI)

The purpose of this paper is to briefly review cleanup regulations in reference to natural resource liability, protection, and restoration; to present a case study on the Rocky Flats Plant (RFP) showing how this DOE facility is approaching the task of integrating the ecological assessment/impact portion of three major regulatory mandates: Resource Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and the National Environmental Policy Act (NEPA) with the Natural Resource Damage Assessment (NRDA) regulations using a flow chart depicting RCRA/CERCLA interim and final actions; to present what has and has not worked at the RFP; and, finally to suggest some technical strategies when planning for remediation and restoration in the NRD process that should be considered.

Knudsen, T.L.

1993-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Integrating NRDA and CERCLA environmental evaluations at the Rocky Flats Plant: A case study  

SciTech Connect (OSTI)

The purpose of this paper is to briefly review cleanup regulations in reference to natural resource liability, protection, and restoration; to present a case study on the Rocky Flats Plant (RFP) showing how this DOE facility is approaching the task of integrating the ecological assessment/impact portion of three major regulatory mandates: Resource Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and the National Environmental Policy Act (NEPA) with the Natural Resource Damage Assessment (NRDA) regulations using a flow chart depicting RCRA/CERCLA interim and final actions; to present what has and has not worked at the RFP; and, finally to suggest some technical strategies when planning for remediation and restoration in the NRD process that should be considered.

Knudsen, T.L.

1993-01-01T23:59:59.000Z

422

Geothermal resources of Montana  

SciTech Connect (OSTI)

The Montana Bureau of Mines and Geology has updated its inventory of low and moderate temperature resources for the state and has assisted the Oregon Institute of Technology - GeoHeat Center and the University of Utah Research Institute in prioritizing and collocating important geothermal resource areas. The database compiled for this assessment contains information on location, flow, water chemistry, and estimated reservoir temperatures for 267 geothermal well and springs in Montana. For this assessment, the minimum temperature for low-temperature resource is defined as 10{degree} C above the mean annual air temperature at the surface. The maximum temperature for a moderate-temperature resource is defined as greater than 50{degree} C. Approximately 12% of the wells and springs in the database have temperatures above 50{degree} C, 17% are between 30{degree} and 50{degree} C, 29% are between 20{degree} and 30{degree}C, and 42% are between 10{degree} and 20{degree} C. Low and moderate temperature wells and springs can be found in nearly all areas of Montana, but most are in the western third of the state. Information sources for the current database include the MBMG Ground Water Information Center, the USGS statewide database, the USGS GEOTHERM database, and new information collected as part of this program. Five areas of Montana were identified for consideration in future investigations of geothermal development. The areas identified are those near Bozeman, Ennis, Butte, Boulder, and Camas Prairie. These areas were chosen based on the potential of the resource and its proximity to population centers.

Metesh, J.

1994-06-01T23:59:59.000Z

423

Valuation of ecological resources  

SciTech Connect (OSTI)

Ecological resources are resources that have functional value to ecosystems. Frequently, these functions are overlooked in terms of the value they provide to humans. Environmental economics is in search of an appropriate analysis framework for such resources. In such a framework, it is essential to distinguish between two related subsets of information: (1) ecological processes that have intrinsic value to natural ecosystems; and (2) ecological functions that are values by humans. The present study addresses these concerns by identifying a habitat that is being displaced by development, and by measuring the human and ecological values associated with the ecological resources in that habitat. It is also essential to determine which functions are mutually exclusive and which are, in effect, complementary or products of joint production. The authors apply several resource valuation tools, including contingent valuation methodology (CVM), travel cost methodology (TCM), and hedonic damage-pricing (HDP). One way to derive upper-limit values for more difficult-to-value functions is through the use of human analogs, because human-engineered systems are relatively inefficient at supplying the desired services when compared with natural systems. Where data on the relative efficiencies of natural systems and human analogs exist, it is possible to adjust the costs of providing the human analog by the relative efficiency of the natural system to obtain a more realistic value of the function under consideration. The authors demonstrate this approach in an environmental economic case study of the environmental services rendered by shrub-steppe habitats of Benton County, Washington State.

Scott, M.J.; Bilyard, G.R.; Link, S.O.; Ricci, P.F.; Seely, H.E.; Ulibarri, C.A.; Westerdahl, H.E.

1995-04-01T23:59:59.000Z

424

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...  

Broader source: Energy.gov (indexed) [DOE]

(Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Boston Massachusetts: Solar in Action (Brochure), Solar America Cities, Energy Efficiency &...

425

Transmission/Resource Library/Resources | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library/Resources < Transmission‎ | Resource Library(Redirected from Transmission/Resource Library/Public Involvement) Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Public Participation for Interstate Transmission Public participation is a requirement of any project that must comply with

426

Rangeland Resource Management for Texans: Total Resource Management  

E-Print Network [OSTI]

The Total Resource Management approach helps ranchers make strategic, tactical and operational decisions for the best, most cost-effective use of resources. This publication offers step-by-step directions for implementing TRM for a profitable...

Hanselka, C. Wayne; Fox, William E.; White, Larry D.

2004-03-26T23:59:59.000Z

427

India National Action Plan on Climate Change | Open Energy Information  

Open Energy Info (EERE)

India National Action Plan on Climate Change India National Action Plan on Climate Change Jump to: navigation, search Tool Summary Name: India National Action Plan on Climate Change Agency/Company /Organization: India Prime Minister's Council On Climate Change Sector: Energy, Land Topics: Low emission development planning, Background analysis Resource Type: Publications, Case studies/examples Website: pmindia.nic.in/climate_change.htm Country: India Southern Asia Coordinates: 20.593684°, 78.96288° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":20.593684,"lon":78.96288,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

428

Bangladesh Climate Change Strategy and Action Plan | Open Energy  

Open Energy Info (EERE)

Bangladesh Climate Change Strategy and Action Plan Bangladesh Climate Change Strategy and Action Plan Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Bangladesh Climate Change Strategy and Action Plan Agency/Company /Organization: Bangladesh Ministry of Environment Sector: Energy, Land Topics: Low emission development planning Resource Type: Publications, Case studies/examples Website: www.moef.gov.bd/moef.pdf Country: Bangladesh Southern Asia Coordinates: 23.684994°, 90.356331° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":23.684994,"lon":90.356331,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

429

Indonesia National Action Plan Addressing Climate Change | Open Energy  

Open Energy Info (EERE)

Indonesia National Action Plan Addressing Climate Change Indonesia National Action Plan Addressing Climate Change Jump to: navigation, search Tool Summary Name: Indonesia National Action Plan Addressing Climate Change Agency/Company /Organization: Indonesia State Ministry of Environment Sector: Energy, Land Topics: Background analysis, Low emission development planning Resource Type: Case studies/examples, Publications Website: climatechange.menlh.go.id/index.php?option=com_docman&task=down&bid=17 Country: Indonesia South-Eastern Asia Coordinates: -0.789275°, 113.921327° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-0.789275,"lon":113.921327,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

430

US State Climate Action Plans | Open Energy Information  

Open Energy Info (EERE)

US State Climate Action Plans US State Climate Action Plans Jump to: navigation, search Tool Summary LAUNCH TOOL Name: US State Climate Action Plans Agency/Company /Organization: Center for Climate Strategies Sector: Energy, Land Topics: Low emission development planning, Background analysis Resource Type: Case studies/examples Website: www.climatestrategies.us/Papers_Publications_Presentations.cfm Country: United States Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

431

WATER RESOURCES NEWS NEBRASKA WATER RESOURCES RESEARCH INSTITUTE  

E-Print Network [OSTI]

WATER RESOURCES NEWS NEBRASKA WATER RESOURCES RESEARCH INSTITUTE 212 AGRICULTURAL ENGINEERING OF THE DIRECTOR . . . April 1973 NEBRASKA AND THE NATIONAL WATER COMMISSION REPORT The National Water Commission grew out of con t r-ovc rey over water resource deve lopment in the Colorado River Basin. Rp

Nebraska-Lincoln, University of

432

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12  

SciTech Connect (OSTI)

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

433

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program  

SciTech Connect (OSTI)

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

434

CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

DAVIS, M.

2005-04-01T23:59:59.000Z

435

Corrective Action Investigation Plan for Corrective Action Unit 487: Thunderwell Site, Tonopah Test Range, Nevada (Rev. No.: 0, January 2001)  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 487, Thunderwell Site, Tonopah Test Range (TTR), Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 487 consists of a single Corrective Action Site (CAS), RG 26-001-RGRV, Thunderwell Site. The site is located in the northwest portion of the TTR, Nevada, approximately five miles northwest of the Area 3 Control Point and closest to the Cactus Flats broad basin. Historically, Sandia National Laboratories in New Mexico used CAU 487 in the early to mid-1960s for a series of high explosive tests detonated at the bottom of large cylindrical steel tubes. Historical photographs indicate that debris from these tests and subsequent operations may have been scattered and buried throughout the site. A March 2000 walk-over survey and a July 2000 geophysical survey indicated evidence of buried and surface debris in dirt mounds and areas throughout the site; however, a radiological drive-over survey also performed in July 2000 indicated that no radiological hazards were identified at this site. Based on site history, the scope of this plan is to resolve the problem statement identified during the Data Quality Objectives process that detonation activities at this CAU site may have resulted in the release of contaminants of concern into the surface/subsurface soil including total volatile and total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, radionuclides, total petroleum hydrocarbons, and high explosives. Therefore, the scope of corrective action field investigation will involve excavation, drilling, and extensive soil sampling and analysis activities to determine the extent (if any) of both the lateral and vertical contamination and whether or not any such contamination extends beyond the historical boundaries of the site. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.

DOE/NV

2001-01-02T23:59:59.000Z

436

Moab Project Offers Unique Educational Resource in Site Tours | Department  

Broader source: Energy.gov (indexed) [DOE]

Project Offers Unique Educational Resource in Site Tours Project Offers Unique Educational Resource in Site Tours Moab Project Offers Unique Educational Resource in Site Tours May 2, 2013 - 12:00pm Addthis Students from the University of Utah contemplate the hillside geology at the rail load out area while Moab Federal Project Director Donald Metzler (in orange vest) addresses a question. The uranium mill tailings pile is behind and below the viewing area. Students from the University of Utah contemplate the hillside geology at the rail load out area while Moab Federal Project Director Donald Metzler (in orange vest) addresses a question. The uranium mill tailings pile is behind and below the viewing area. As Durham University students stand on the bank of the Colorado River, Moab Groundwater Manager Ken Pill (in yellow vest at left) explains how the groundwater interim action system operates. A well vault is in the foreground.

437

Colorado Statewide Forest Resource Assessment  

E-Print Network [OSTI]

Colorado Statewide Forest Resource Assessment A Foundation for Strategic Discussion and Implementation of Forest Management in Colorado #12;Acknowledgements The Colorado State Forest Service (CSFS, for providing leadership and oversight throughout the development of Colorado's Statewide Forest Resource

438

PDSF I/O Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IO Resources IO Resources Motivation Many users must run jobs that read datasets that are too large to transfer to the scratch directory. When large numbers of these jobs run...

439

Estimation of resources and reserves  

E-Print Network [OSTI]

This report analyzes the economics of resource and reserve estimation. Current concern about energy problems has focused attention on how we measure available energy resources. One reads that we have an eight-year oil ...

Massachusetts Institute of Technology. Energy Laboratory.

1982-01-01T23:59:59.000Z

440

Resource portfolio management: bundling process  

E-Print Network [OSTI]

Managers within firms seek to align their portfolio of capabilities to best respond to their competitive environment. Processes used by firms to acquire resources, bundle those resources into capabilities, and then leverage those capabilities...

Worthington, William John

2009-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Gradient Resources | Open Energy Information  

Open Energy Info (EERE)

Resources Resources Jump to: navigation, search Logo: Gradient Resources Name Gradient Resources Address 9670 Gateway Drive, Suite 200 Place Reno, Nevada Zip 89521 Sector Geothermal energy Year founded 1991 Company Type For Profit Phone number (775) 284-8842 Website http://www.gradient.com/ Region Rockies Area References Gradient Resources Website[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! Gradient Resources is a company based in Reno, Nevada. Gradient Resources is engaged in the exploration and development of geothermal resources as well as the construction, ownership and operation of geothermal power plants. The Company is headquartered in Reno, Nevada with a regional office, drilling operations center, and well-cementing

442

VA Energy Management Action Plan  

Broader source: Energy.gov (indexed) [DOE]

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

443

Dynamo action in flows with  

E-Print Network [OSTI]

Dynamo action in flows with cat's eyes A l i c e C o u r v o i s i e r A n d r e w G i l b e r t Y of k for R = 500 and the flow (2.4) and (2.5). nts k = 2.5 and k = 5 are highlighted. Magnetic field). In (a) k = 2.5 and we have 0.5 max Bz (with max Bz 0.6 max |B|), and in (b) k = 5 and the levels .65 max

Li, Yi

444

Numerical Tests of the Improved Fermilab Action  

E-Print Network [OSTI]

Recently, the Fermilab heavy-quark action was extended to include dimension-six and -seven operators in order to reduce the discretization errors. In this talk, we present results of the first numerical simulations with this action (the OK action), where we study the masses of the quarkonium and heavy-light systems. We calculate combinations of masses designed to test improvement and compare results obtained with the OK action to their counterparts obtained with the clover action. Our preliminary results show a clear improvement.

C. Detar; A. S. Kronfeld; M. B. Oktay

2010-11-23T23:59:59.000Z

445

Corrections for Water Resources Engineering  

E-Print Network [OSTI]

Corrections for Water Resources Engineering (Fourth printing) By Larry W. Mays Corrections as of 4 subcritical flow ..." Chapter

Mays, Larry W.

446

people_resources.html  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Explorations of the Universe Explorations of the Universe Cosmic Voyage and A Travel Guide for Educators TV Field Trip Visits Fermilab Resources for the Cosmic Puzzle Cosmic Voyage and A Travel Guide for Educators Two additional resources are available to add to our understanding of the early universe. Cosmic Voyage is a video produced for IMAX/OMNIMAX theaters. Check with the IMAX theatres in your areas to see if it is scheduled. The video is also available as a VHS tape for personal viewing and is available for purchase through: 70 MM Inc., 7 McCarty Crescent, Markham, Ontario L3P 4R4, Canada, 1-800-263-IMAX (Outside of North America call 905-472-9575) for $29.95 plus $5.00 shipping. The video Cosmic Voyage explores the inner and outer space connection in a similar fashion to the classic film, Powers of Ten (available through the

447

Geothermal Resources Council's 36  

Office of Scientific and Technical Information (OSTI)

Geothermal Resources Council's 36 Geothermal Resources Council's 36 th Annual Meeting Reno, Nevada, USA September 30 - October 3, 2012 Advanced Electric Submersible Pump Design Tool for Geothermal Applications Xuele Qi, Norman Turnquist, Farshad Ghasripoor GE Global Research, 1 Research Circle, Niskayuna, NY, 12309 Tel: 518-387-4748, Email: qixuele@ge.com Abstract Electrical Submersible Pumps (ESPs) present higher efficiency, larger production rate, and can be operated in deeper wells than the other geothermal artificial lifting systems. Enhanced Geothermal Systems (EGS) applications recommend lifting 300°C geothermal water at 80kg/s flow rate in a maximum 10-5/8" diameter wellbore to improve the cost-effectiveness. In this paper, an advanced ESP design tool comprising a 1D theoretical model and a 3D CFD analysis

448

2009 Resource Allocations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Post-2009 Resource Allocations Post-2009 Resource Allocations On March 27, 2009, Western Area Power Administration's Rocky Mountain Region (RMR) published the Federal Register Notice of Proposed Power Allocation. A Public Comment Forum is scheduled for Thursday, April 16, 2009, at 1:00 p.m. MDT at the Ramada Plaza and Conference Center, 10 East 120th Avenue, Northglenn, Colorado 80233, telephone number (303) 452-4100. Interested Parties and Loveland Area Projects Customers are encouraged to attend. Interest Parties and Loveland Area Projects Customers have 30 days to comment on the proposed allocations; comments are due to RMR by 4:00 p.m. on April 27, 2009. Once comments are received, RMR will determine final allocations, and publish those as well as responses to comments in the Federal Register. The new contracts (and revised exhibits for existing customers) must be executed before October 1, 2009, when the new firm electric service allocations become effective for all customers.

449

Office of Information Resources  

Broader source: Energy.gov (indexed) [DOE]

Federal Bureau of Investigations Billing System Federal Bureau of Investigations Billing System Bureau: Department of Energy Project Unique ID: 01 9-10-01 -22-02-3028-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

450

Utility Metering - AGL Resources  

Broader source: Energy.gov (indexed) [DOE]

AGL Resources AGL Resources Mike Ellis Director, AGL Energy Services Federal Utility Partnership Working Group Spring 2013 - May 22-23 San Francisco, CA Hosted by: Pacific Gas and Electric Company  Multiple LDCs with legacy metering equipment  Several use Itron 100G technology ◦ Mobile, once-a-month data collection ◦ Meter can store interval data for >30 days ◦ Meter technology could be leverage on fixed-base network, however there are no current plans for upgrade  Technology for capturing interval data is installed on case by case basis ◦ Customers on Interruptible Rate ◦ Large users  Electronic corrector installed on the meter ◦ Pressure and Temperature compensation  Typically data is retrieved once a day ◦ Transmission frequency impacts battery life

451

For Researchers: Entrepreneurial Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Entrepreneurial Resources Entrepreneurial Resources What determines which technologies become the foundation for a new company? In essence, a technology must attract the necessary financing from venture capital or other sources. In order to do this, the technology must offer a fundamental improvement or the basis for a new product or service. Generally the improvement must be significant, as opposed to an incremental, with great potential for market impact. It is also important that the technology enjoy a strong proprietary position. It must have, for example, an issued patent or a patent pending, with strong claims that separate it from competing technologies. The cutting-edge nature of research here at Berkeley Lab often results in technologies that meet these criteria. The Technology Transfer Department

452

Office of Information Resources  

Broader source: Energy.gov (indexed) [DOE]

Office of Personnel Management (OPM) Billing System Office of Personnel Management (OPM) Billing System Bureau: Department of Energy Project Unique ID: 01 9-1 0-01 -22-02-3048-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.2 l), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS- 1.2 1, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

453

Better Buildings Neighborhood Program: Resource Directory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tools & Resources Tools & Resources Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Resource Directory to someone by E-mail Share Better Buildings Neighborhood Program: Resource Directory on Facebook Tweet about Better Buildings Neighborhood Program: Resource Directory on Twitter Bookmark Better Buildings Neighborhood Program: Resource Directory on Google Bookmark Better Buildings Neighborhood Program: Resource Directory on Delicious Rank Better Buildings Neighborhood Program: Resource Directory on Digg Find More places to share Better Buildings Neighborhood Program: Resource Directory on AddThis.com... Case Studies Resource Directory Webcasts Workshops Grants Administration Resource Directory The guidance documents and reports below have been used by Better Buildings

454

Solar Energy Resource Center | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Resource Center Solar Energy Resource Center The SunShot Initiative's Solar Energy Resource Center contains work developed by DOE, national laboratories and SunShot...

455

Harvesting a renewable resource under uncertainty  

E-Print Network [OSTI]

is pervasive for renewable resources, and it can play aConsider a valuable renewable resource whose biomass X2003. Harvesting a renewable resource under uncertainty,

Saphores, Jean-Daniel M

2003-01-01T23:59:59.000Z

456

Community Energy Strategic Planning Resources | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Resources Community Energy Strategic Planning Resources Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S....

457

Congressional Affairs Resources | Department of Energy  

Office of Environmental Management (EM)

Resources Congressional Resources United States Senate Senate Energy and Natural Resources Committee Senate Committee on Environment and Public Works Senate Appropriations...

458

California Air Resources Board | Open Energy Information  

Open Energy Info (EERE)

Air Resources Board Jump to: navigation, search Logo: California Air Resources Board Name: California Air Resources Board Place: Sacramento, California Website: http:...

459

PIA - Human Resources Information System (HRIS) | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Information System (HRIS) PIA - Human Resources Information System (HRIS) PIA - Human Resources Information System (HRIS) PIA - Human Resources Information System (HRIS) More...

460

Office of Information Resources | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office of Information Resources Office of Information Resources FOIAPA POC List as of February 02, 2009 Office of Information Resources More Documents & Publications Privacy Act...

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

PIA - Human Resources Management Information System (HRMIS) ...  

Energy Savers [EERE]

Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PIA - Human Resources Management...

462

Integrated Safety Management Safety Culture Resources | Department...  

Broader source: Energy.gov (indexed) [DOE]

Safety Culture Resources Integrated Safety Management Safety Culture Resources A collection of resources available in implementing ISM safety culture activities Safety from the...

463

Avian Conservation Resources | Open Energy Information  

Open Energy Info (EERE)

Conservation Resources Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Avian Conservation ResourcesLegal Abstract Resources and...

464

Resources on Greenhouse Gas | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Greenhouse Gases Resources on Greenhouse Gas Resources on Greenhouse Gas Many helpful resources about greenhouse gases (GHG) are available. Also see Contacts. GHG Reporting and...

465

WINDExchange: Wind Energy Regional Resource Centers  

Wind Powering America (EERE)

Bookmark and Share Regional Resource Centers About Economic Development Siting Wind Energy Regional Resource Centers The U.S. Department of Energy's Regional Resource Centers...

466

Solar Energy Resource Center | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Resource Center Solar Energy Resource Center Sub Program Topic Resource Search Results Title Date Author SubProgram Topic Description...

467

Solar Energy Resource Center | Department of Energy  

Office of Environmental Management (EM)

Solar Energy Resource Center Solar Energy Resource Center Sub Program Topic Resource Search Results Title Date Author SubProgram Topic Description...

468

Deepwater Oil & Gas Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Deepwater Oil & Gas Resources Deepwater Oil & Gas Resources The United States has significant natural gas and oil reserves. But many of these resources are increasingly harder to...

469

CHERRY: CHECKPOINTED EARLY RESOURCE RECYCLING  

E-Print Network [OSTI]

1 2 3 CHERRY: CHECKPOINTED EARLY RESOURCE RECYCLING Jos´e F. Mart´inez1 , Jose Renau2 Michael C. Huang3 , Milos Prvulovic2 , and Josep Torrellas2 #12;Cherry: Checkpointed Early Resource Recycling efficient use by aggressive recycling Opportunity: Resources reserved until retirement § ¦ ¤ ¥ Solution

Torrellas, Josep

470

Water Resources Working Group Report  

E-Print Network [OSTI]

Water Resources Working Group Report This report provided content for the Wisconsin Initiative in February 2011. #12;Water Resources Working Group Wisconsin Initiative on Climate Change Impacts October 2010 #12;Water Resources Working Group Members ­ WICCI Tim Asplund (Co-Chair) - Wisconsin Department

Sheridan, Jennifer

471

Water Resources Competitive Grants Program  

E-Print Network [OSTI]

Water Resources Competitive Grants Program Fiscal Year 2012 Request for Proposals Pursuant to Section 104 of the Water Resources Research Act of 1984, as Amended Closing Date 4:00 PM, Eastern Time, August 15, 2012 (Institutes) Institute for Water Resources National Institutes for U.S. Army Corps

Virginia Tech

472

EIS-0397: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...

473

EA-1912: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Mitigation Action Plan EA-1912: Mitigation Action Plan Midway-Benton No. 1 Rebuild Project, neartown of Desert Aire, Benton County, Washington This Mitigation Action Plan (MAP)...

474

Corrective Action Tracking System (CATS) | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Action Tracking System (CATS) Corrective Action Tracking System (CATS) The CATS web-based database is used to enter, track, and report the status of corrective actions...

475

EA-1891: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan EA-1891: Mitigation Action Plan Alvey-Fairview Transmission Line Rebuild Project, Oregon This Mitigation Action Plan (MAP) is part of the Finding of No...

476

Part 3: Removal Action | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Removal Action 3: Removal Action Part 3: Removal Action Question: When may removal actions be initiated? Answer: Removal actions may be initiated when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to health or the environment. The NCP specifies that the determination that a risk to health or the environment is appropriate for removal action should be based on: actual or potential exposure of humans, animals, or the food chain the presence of contained hazardous substances that pose a threat of release the threat of migration of the hazardous substances the threat of fire or explosion the availability of an appropriate Federal or State response capability [section 300.415(b)(2)]. In essence, where DOE identifies a threat of exposure to or migration of

477

Kenya-Action Plan for National Climate Change Response Strategy | Open  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Kenya-Action Plan for National Climate Change Response Strategy Jump to: navigation, search Name CDKN-Kenya-Action Plan for National Climate Change Response Strategy Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment and Mineral Resources on behalf of the National CC Task Force, HTSPE, IDLA, LTS International/ ACCLIMATISE, IISD, Adam Smith International +subcontractors Sector Climate, Energy, Land Topics Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/2011/04/an-act Program Start 2010 Program End 2012 Country Kenya

478

Affirmative Action and Equal Opportunity  

E-Print Network [OSTI]

MModAtIon SECTION NINE ForMAl GrIevAnCe deAdlInes SECTION TEN resourCes #12;IntroduCtIon INTRODUCTIONTOTHE OAAEO­24 25­29 SECTION ONE IntroduCtIon to the oAAeo SECTION TWO oAAeo ConstItuents SECTION THREE FACulty MeMBers, dIreCtors, And supervIsors: responsIBIlIty And AssIstAnCe SECTION FOUR deFInItIons relAted to d

Oregon, University of

479

Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.

DOE /NV

1998-12-08T23:59:59.000Z

480

4 - Coal resources and reserves  

Science Journals Connector (OSTI)

Abstract: Coal resources still make up a significant proportion of the worlds energy supplies. Coal resources are estimated to be 860 billion tonnes. These resources are geographically well distributed and current production provides fuel for 29% of the worlds primary energy consumption. The classification of coal resources and reserves has been redefined in recent years, with the standards and codes of practice adopted by the principal coal-producing countries being equated on a global basis. Details of the principal classifications are given, together with their international equivalents. Reporting of resources and reserves plus methods of calculation are also given, together with recent assessments of global coal reserves.

L.P. Thomas

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "action rcra resource" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment corrective actions/compliance schedule approval report  

SciTech Connect (OSTI)

This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.

Biebesheimer, E.

1996-09-30T23:59:59.000Z

482

Developer Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Developer Resources Developer Resources Developer Resources Apps for Energy The Energy Department is challenging developers to use the Green Button data access program to bring residential and commercial utility data to life with fun and creative apps. Read more Learn about Green Button Apps for Energy submissions must use Green Button data. To learn more, start here. Read more NREL Resources NREL offers a number resources for Green Button app developers. Find out more! Read more Vehicle Data Resources Sample Vehicle Data (Apps for Vehicles) OpenXC Translation Output Format Vehicle Data API OpenEI Developer FAQ OpenXC Platform Guide OpenEI Hackathon Resources EPA OBD Page Society of Automotive Engineers OBD Page Other Agencies Energy.Data.gov Geo.Data.Gov Census Data Census: TIGER Geographic Data

483

Modeling renewable energy resources in integrated resource planning  

SciTech Connect (OSTI)

Including renewable energy resources in integrated resource planning (IRP) requires that utility planning models properly consider the relevant attributes of the different renewable resources in addition to conventional supply-side and demand-side options. Otherwise, a utility`s resource plan is unlikely to have an appropriate balance of the various resource options. The current trend toward regulatory set-asides for renewable resources is motivated in part by the perception that the capabilities of current utility planning models are inadequate with regard to renewable resources. Adequate modeling capabilities and utility planning practices are a necessary prerequisite to the long-term penetration of renewable resources into the electric utility industry`s resource mix. This report presents a review of utility planning models conducted for the National Renewable Energy Laboratory (NREL). The review examines the capabilities of utility planning models to address key issues in the choice between renewable resources and other options. The purpose of this review is to provide a basis for identifying high priority areas for advancing the state of the art.

Logan, D.; Neil, C.; Taylor, A. [RCG/Hagler, Bailly, Inc., Boulder, CO (United States)

1994-06-01T23:59:59.000Z

484

DOE Standards Actions, November 1999  

Broader source: Energy.gov (indexed) [DOE]

DOE Projects Canceled DOE Projects Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Worker Protection for Uranium Facilities, Project Number SAFT-0058; Peter O’Connell, EH-52; 301-903-5641, Peter .O’Connell@eh.doe.gov. This project was superceded by Guide of Good Practices for Oc- cupational Radiological Protec- tion in Uranium Facilities, Project Number SAFT-0072. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with copies for comment. The full text of these documents are available on the Technical Standards Pro- gram (TSP) Web Site at the URL shown at the bottom of this page.

485

EM International Program Action Table  

Broader source: Energy.gov (indexed) [DOE]

EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 E M I n t e r n a t i o n a l P r o g r a m s Page 1 ACTION TABLE Subject Lead Office Engaging Country Meeting Location Purpose Status Date of Event 3 rd US/German Workshop on Salt Repository Research, Design and Operations N. Buschman, EM-22 Germany Albuquerque & Carlsbad, NM Continue collaboration with Germans on salt repository research, design and operations. Draft agenda prepared. October 8-12, 2012 International Framework for Nuclear Energy Cooperation (IFNEC) Ministerial R. Elmetti, EM- 2.1 Multilateral Marrakech, Morocco To support the development of nuclear energy infrastructure globally through workforce training, information sharing, and approaches related to the safe, secure and responsible use of

486

The Standards Actions, August 1998  

Broader source: Energy.gov (indexed) [DOE]

standard project was recently can- standard project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Guidelines for Preparing Criti- cality Safety Evaluations at De- partment of Energy Non-Reac- tor Nuclear Facilities, Project Number SAFT-0069; Jerry McKamy, EH-34, 301-903-8031, Jerry. McKamy@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Tritium Handling and Safe Storage, Project Number SAFT-0054;

487

The Standards Action - April 1999  

Broader source: Energy.gov (indexed) [DOE]

Projects Canceled Projects Canceled The following DOE technical standard project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Seismic Design and Evaluation Guidelines for High-Level Waste Storage Tanks, 6910-0035; Owen Thompson, EM-38, 301- 903-1926, FAX 301-903-7604, Owen.Thompson@em.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Internet Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Stabilization, Packaging, and Storage of Plutonium-Bearing

488

The Standards Actions February 1996  

Broader source: Energy.gov (indexed) [DOE]

Actions Technical Standards Program Document Status as of 1/31/96 In Preparation 5 7 Out for Comment 2 1 Total in process = 78 Published in Past 30 Days 0 In Conversion 2 3 Projects Initiated The following DOE technical standards projects were recently initiated. If you are interested in participating in the development of these standards, please contact the persons listed below. * Handbook for the Department of Energy Laboratory Accreditation Program for Radiobioassay, Project No. SAFT-0049; Robert Loesch, EH-52; 301-903- 4443, Email, loesch@viper.eh.doe.gov. * Guide to Good Practices for Training and Qualification of Instructors, Project No. 6910-0051; Ken L Maier, EH-31; 208-526- 9178, FAX 208-526-9650, Email, klm4@inel.gov. * Guide to Good Practices for Training and Qualification of

489

Memorandum: Emergency Actions and NEPA  

Broader source: Energy.gov (indexed) [DOE]

8, 2005 8, 2005 MEMORANDUM FOR FEDERAL NEPA CONTACTS FROM: HORST G. GRECZMIEL Associate Director for NEPA Oversight SUBJECT: Emergency Actions and NEPA This memorandum provides: * General information on the response to Katrina * Reporting oil and chemical spills * Projected long term recovery efforts * How agencies can respond to emergencies and comply with NEPA. Please distribute this memorandum to your agency planning and environmental personnel. General information on the response to Katrina: Information is available on the FEMA website